WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
SECTION 1.0 DRILLING OVERVIEW
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Learning Objectives: You should be able to: • Understand the roles of a drilling engineer during a well construction operations. • Explain the importance and the benefits to be gained from a properly constructed well. • Explain the various stages of well construction in PCSB’s drilling operations.
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
Drilling Overview > Why we drill a well ?
> Drilling history > Life of Field w/relation to Drilling > Basic well types - exploration, development, etc. > Basic well configuration - casing scheme & completions > Specifications
PETROLEUM ENGINEERING SG-10
1.0 DRILLING OVERVIEW
WELL CONSTRUCTION
WHY WE DRILL A WELL ?
to gather information • for subsurface evaluation
to produce hydrocarbons • to produce oil or gas
to inject gas or water • for reservoir pressure maintenance • for gas conservation
to “kill” a blow out well • to regain control of a blow out well
PETROLEUM ENGINEERING SG-10
for geothermal power • to produce steam for electric generation
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
WHEN WAS THE FIRST WELL DRILLED ? •
First commercial well was drilled in USA in 1859 •
•
Drilled by Col Edwin L. Drake
First well drilled in Malaysia was in 1910 •
drilled by Shell in Miri (Canada Hill) also called Grand Old Lady
•
PCSB was established on 11 May 1978
•
First well drilled by PCSB was for the Duyong field in Aug1980
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
PETROLEUM ENGINEERING SG-10
1.0 DRILLING OVERVIEW
WELL CONSTRUCTION
PETROLEUM ENGINEERING SG-10
1.0 DRILLING OVERVIEW
WELL CONSTRUCTION
The Grand Old Lady
PETROLEUM ENGINEERING SG-10
1.0 DRILLING OVERVIEW
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
Duyong Platform Complex (Gas Field)
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
False alarm ! It’s untreated sewage…..
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
LIFE OF FIELD CYCLE - DRILLING INVOLVEMENT
In Production and Abandonment Phases - Drilling is involved in Infill Drilling, Workover, and Well Abandonment
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION The look inside the workflow
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
BASIC WELL TYPES Exploration wells • “Wild Cat”
the first exploration well drilled in a new field with no offset well information available to obtain data and prove hydrocarbon presence.
•
Appraisal / Delineation
the subsequent wells drilled after a wild cat well to further assess the field and confirm its commerciality.
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
An exploration well is the ONLY way to prove that hydrocarbons are present
Followed by appraisal and development wells
PETROLEUM ENGINEERING SG-10
1.0 DRILLING OVERVIEW
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
BASIC WELL TYPES .
Development wells •
Oil and/or Gas producer
•
Water injector
•
drilled for reservoir pressure maintenance
Gas injector
•
drilled to produce the hydrocarbon, oil and/or gas.
drilled for reservoir pressure maintenance or gas conservation (avoid flaring of gas, prohibited under certain environmental conditions)
Combination wells
combination of the above e.g oil producer with gas injector or appraisal development wells
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
BASIC WELL TYPES .
Others •
Geothermal wells
•
Water wells
•
Drilled in volcanic areas to inject water & produce steam to generate electricity
To produce water
Drilled cuttings disposal
Use to re-inject cuttings into the formation for disposal
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
BASIC WELL CONFIGURATION Typical casing configuration
Types of well completion
P R O D U C E R PETROLEUM ENGINEERING SG-10
I N J E C T O R
1.0 DRILLING OVERVIEW
WELL CONSTRUCTION
Drilling Operations - Making Holes Typical Sequence of Operations :
• Rig up
Depth reference below derrick floor - bdf rotary kelly bushing - rkb Main deck Cellar deck
depth reference PETROLEUM ENGINEERING SG-10
Sea level
Conductor
WELL CONSTRUCTION
To diverter line
Install diverter
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Surface Casing
Drilling Fluid
Drill 17 1/2” hole PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Surface Casing
Stab-in float collar Run 13 3/8” casing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Surface Casing
5” Drill Pipe Stinger Installed after running casing
Drilling Fluid
13-3/8” Casing
Run cement Carig stinger
ali
PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Surface Casing
5” Drill Pipe Stinger
Cement Slurry
13-3/8” Casing being cemented Cement the surface casing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Surface Casing
5” Drill Pipe Stinger
Drilling Fluid
13-3/8” Casing cemented in place Displace the cement from the stinger PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
13 3/8” Casing (still suspended from the drill floor) BOP Diverter (to be removed)
13 3/8” Casing
13 3/8” Casing cemented to surface PETROLEUM ENGINEERING SG-10
Prepare to remove the diverter and excess casing
WELL CONSTRUCTION
Remove Diverter
Drain and cut the casing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Fillet-Weld casing head to 13 3/8” casing
13 3/8” Casing head
Side outlet valve
Install casing head housing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION Mud Riser
(allows drilling fluid returns to mud system)
BOP Stack
Ring joint flange connects BOP to casing head
13-3/8” Casing PETROLEUM ENGINEERING SG-10
Install BOP stack and mud riser
WELL CONSTRUCTION
BOP Test Plug run on drill pipe
Pressure test BOP stack and well head PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
12-1/4” Drilling Assembly
Well head wear protection sleeve Run 12 1/4” drilling assembly PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Drilling out cement inside 13 3/8” casing shoe track
Drill out casing shoe track PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
13-3/8” Casing Shoe Drilling Fluid returning up annulus
Drill 12 1/4” hole section PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Intermediate Casing
Drilling Fluid
9-5/8” Casing
Casing Float Collar Casing Float Shoe
Run 9 5/8” casing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Intermediate Casing
Drilling Fluid
9-5/8” Casing
Cement slurry behind casing and in shoe track Cement
9 5/8” casing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
9 5/8” casing suspended from rotary table
9 5/8” Casing 13 5/8” Casing Head
13 3/8” Casing PETROLEUM ENGINEERING SG-10
Prepare to lift the BOP stack
WELL CONSTRUCTION
BOP lifted to assist installation of casing slips in casing Head
9 5/8” Casing 9 5/8”casing slip & seal assembly
13 5/8” Casing Head Install casing slip & seal assembly PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Holes cut to drain mud
13 5/8” Casing head housing
9 5/8” casing slips Drain & cut
9 5/8” casing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Casing spool
9 5/8” Casing 13 5/8” Casing Head
PETROLEUM ENGINEERING SG-10
Side Outlet Valve
9 5/8” casing slips Install casing spool
WELL CONSTRUCTION
BOP stack
Casing Spool
Re-install BOP stack PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
BOP Test Plug
Pressure test BOP stack PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
8 1/2” Drilling assembly
Protection sleeve
9 5/8” Casing Run 8 1/2” drilling assembly PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
9 5/8” Casing float shoe
Drill out 9 5/8” casing shoe track PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
9-5/8” Casing shoe
Drill through cap rock (impermeable formation) into reservoir
Drill into reservoir
PETROLEUM ENGINEERING SG-10
Shale
Sandstone or Limestone
Continue drilling into the reservoir
WELL CONSTRUCTION
Production casing
PETROLEUM ENGINEERING SG-10
Run and cement the production casing
WELL7” CONSTRUCTION casing slip
and seal assembly
BOP lifted to assist installation of slip and seal assembly
Casing Spool 9-5/8” Casing
PETROLEUM ENGINEERING SG-10
Set the 7” casing slip and seal assembly
WELL CONSTRUCTION
Holes cut to drain mud
Drain and cut the production casing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Tubing Spool
Side Outlet Valve
Casing Spool
Casing Head Install the tubing head spool PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Re-install BOP
Bit and scraper assembly for 7” casing Protective Sleeve 7” Casing
Run bit and casing scraper PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Casing scraper Production casing
Bit
Run bit and casing scraper to clean out casing PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Production casing
Perforations
PETROLEUM ENGINEERING SG-10
Perforate casing in selected production interval
WELL CONSTRUCTION
Production tubing
Production casing
Production packer
Tail pipe
Install well completion PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
Tubing hanger Production tubing
PETROLEUM ENGINEERING SG-10
Suspend production tubing on tubing hanger
WELL CONSTRUCTION
Connection to flow line
Christmas tree
PETROLEUM ENGINEERING SG-10
Remove BOP and Install Christmas tree
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
FUNDAMENTALS OF DRILLING OPERATIONS
TYPICAL SEQUENCE OF DRILLING OPERATIONS Exploration/Appraisal Well - Floating Drilling Unit • Anchor & Position rig • Spud well, drill pilot hole and open pilot hole • Run conductor casing & Permanent Guide Base • Drill pilot hole/surface hole • Set surface casing • Run BOP on marine riser • Drill intermediate hole (pilot hole if necessary) • Log intermediate hole • Set intermediate casing • Test BOP • Drill/core production hole • Run logs • Set production casing • Perform well testing • Plug and abandon, move off location PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
1.0 DRILLING OVERVIEW
TYPICAL SEQUENCE OF DRILLING OPERATIONS Development Well - Jack-up or Tender Assisted • Position rig • Skid rig over slot • Clean out conductor • Set cement plug • Drill top hole (pilot hole if first well) • Set surface casing • Install & test BOP • Drill intermediate hole • Set intermediate casing • Install & test BOP • Drill production hole • Run logs • Set production casing • Complete well • Skid rig PETROLEUM ENGINEERING SG-10
WELL CONSTRUCTION
DRILLING MOVIE
PETROLEUM ENGINEERING SG-10