BAL RAJESHAM

LINE TRACE STAGE -3 TURBINE SYSTEM SCHEMES STAGE-3

OPERATION DEPARTMENT RAMAGUNDAM SUPER THERMAL POWER STATION

!"

Date:22-12-2005

MESSAGE I am glad to know that Operation department has prepared Stage-III Turbine schematics in the form of booklet titled “LINE TRACE”. Successful organizations understand that learning leads to business leverage. This book is designed user friendly containing all the intricate details of schemes for easy learning, efficient monitoring, safe isolation and normalization of systems. The book is found to be very convenient for day to day jobs and users can easily understand and visualize the systems and schemes. The schemes drawn in this booklet titled LINE TRACE contain fine details of the schemes as erected in Unit-7 Turbine side. I am sure that all employees and new entrants to Operation will make use of this book as an immediate reference for improving their skills. I convey my warmest greetings to all employees in Operation department and wish them all success.

FOREWORD

Date:22-12-2005

Efficient and reliable operation of Thermal Power Station mainly depends upon the awareness of various systems and schemes by operation & Maintenance personal about the plant. Operation department attaches great importance for training and development interventions of all its employees technically by providing all the necessary material such as schematics. The compiler has immensely involved and drawn the schemes to lend a new edge for achieving better operation practices. The book will be useful in improving knowledge and skills of the operation fraternity. I am confident that all the employees of Stage-III operation will make use of this schematic booklet for immediate reference and enhancing their skills, thereby improving productivity. I hope this book will be of great help to one and all in operation & Maintenance departments.

LINE TRACE

DETAILED OPERATING SYSTEM SCHEMES STAGE-3 TURBINE AND AUXILIARIES TRACED, DRAWN AND COMPILED BY

V.BAL RAJESHAM EMP.NO. 31744 SR.OPERATOR GR.III STAGE-3 TURBINE OPERATOR

OPERATION DEPARTMENT RAMAGUNDAM SUPER THERMAL POWER STATION DISCLAIMER NOTE Enough care was taken on drawing,compiling and printing. Even then any mistakes found or doubts faced, please confirm and follow the instructions of experienced superior. Before operating any Equipment,don’t be in a hurry to act.Always think before you act. STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

THANKS THANKS TO TO

ACKNOWLEDGEMENTS ACKNOWLEDGEMENTS

Sri. Sri. THOMAS THOMAS JOSEPH, JOSEPH, A.G.M. A.G.M. (O&M) (O&M) Sri. Sri. PRAKASH PRAKASH TIWARI, TIWARI, D.G.M. D.G.M. (O) (O) Sri. Sri. T.RANGANATHAN, T.RANGANATHAN, Sr.Supdt. Sr.Supdt. (O) (O)

Sri. Sri. A.V.S. A.V.S. RAO, RAO, Sr.Supdt. Sr.Supdt. (O) (O)

AND AND SCRUITINY AND CORRECTION OF THIS BOOK BY Sri. Sri. A.K.MANOHAR, A.K.MANOHAR, Sr.Supdt. Sr.Supdt. (T/M) (T/M) Sri. -1(O)-Printing Sri. G.VENKATADRI, G.VENKATADRI, S.S S.S-1(O)-Printing

Sri. Sri. P.RAMA P.RAMA RAO, RAO, Engineer. Engineer. (O) (O) COLLEGUES COLLEGUES AND AND FRIENDS FRIENDS

BY BY V.BAL V.BAL RAJESHAM, RAJESHAM, Sr.Operator Sr.Operator Gr.III Gr.III UNIT-7 UNIT-7 TURBINE TURBINE OPERATOR OPERATOR STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

OPERATION OPERATION DEPARTMENT DEPARTMENT

OUR VISION To be one of the world’s largest and best power utilities, powering India’s growth

OUR CORE VALUES CUSTOMER FOCUS ORGANIZATIONAL PRIDE MUTUAL RESPECT AND TRUST INITIATIVE AND SPEED TOTAL QUALITY STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

T I M O C

# Animated Electronic Manual

Compiled in the Year of - 2003

$

%

Self Explainer and User Friendly Show On Stage-1 Turbine Oil System Schematic Book

Compiled in the Year of - 2004

Stage-1 Turbine Detailed Operating System Schemes Schematic Book

Compiled in the Year of - 2005

Stage-3 Turbine Detailed Operating System Schemes Please Visit:- e-departments O&M / operation / Vision Show Book &

$' $' STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

( (

MAIN CONTENTS PART-1 WATER SYSTEMS AND CONDENSER

01 TO 15

PART-2 STEAM SYSTEMS AND HEAT EXCHANGERS

16 TO 30

PART-3 BOILER FEED PUMPS AND CONNECTIONS

31 TO 40

PART-4 MAIN TURBINE MOT AND CFT OIL

41TO 50

PART-5 GENERATOR AND SEAL OIL SYSTEM

51 TO 56

PART-6 DOSING SYSTEMS AND FIRE WATER

57 TO 63

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

CONTENTS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16

WATER SYSTEMS AND CONDENSER Turbo Generator Auxiliary Cooling Water System ECW Pumps and PHE System ECW System (Full View) DM Makeup and CST Connections CEP Connections Condensate System Feed Water System GSC Blower Connections Circulating Water System C O L T C System Condenser Connections Condenser Air Evacuation System (V/Pump) Condensate Polishing Unit Service Water System STEAM SYSTEMS AND HEAT EXCHANGERS HP Turbine Steam Circuit

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

17 18 19 20 21 22 23 24 25 26 27 28 29 30

IP Turbine and LP Turbine Steam Circuit HP Heaters Extractions and Drips LP Heaters Extractions and Drips LPH and HPH Air Vents and Drains HP By Pass System LP By Pass System Seal Steam System Deaerator Connections Auxiliary Steam System Mal Valves Flash Tank Connections HP Flash Tank Connections LP Flash Tank Connections SDFT and UFT Connections SVD Flash Tank Connections BOILER FEED PUMPS AND CONNECTIONS 31 MD BFP- Seal and Cool Water Lines 32 MD BFP- Feed Water and Oil System 33 TD BFP-A Feed Water System

CONTENTS 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

TD BFP-A Turbine Steam Circuit TD BFP- Seal and Cool Water Lines TD BFP- MOT Connections TD BFP- Lubricating Oil System TD BFP- Jacking Oil System TD BFP- MOT Oil Purification System TD BFP- MOT Cooler and Filter MAIN TURBINE MOT AND CFT OIL Main Turbine- MOT Connections Main Turbine- Lubricating Oil System Main Turbine- Jacking Oil System Main Turbine- MOT Cooler and Filter Main Turbine- MOT Oil Purification System Central Lube Oil Storage Tanks Connections Central Lube Oil Storage Tanks- Centrifuge Control Fluid Tank and Pumps CFT Oil Purification System CFT Cooler and Draining System

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

51 52 53 54 55 56 57 58 59 60 61 62 63 64

GENERATOR AND SEAL OIL SYSTEM Generator-Seal Oil System Generator- Gas Fill and Vent System Generator-H2 Drier Connections Generator-Primary Water System Generator-BCVE Fans Connections Generator Gas cooling Water System and LLD DOSING SYSTEMS AND FIRE WATER Hydrazine Dosing System (N2H4) Ammonia Dosing System (NH3) Phosphate Dosing System (PO4 Sodium Hydroxide Dosing System (NAOH) Fire Water System (Spray & Hydrant) Fire Water System-D.V.and WR Numbers Fire Water Pump House Notes Page

SYMBOLS Manual Operated Valve

Pressure Relief Valve

Nozzle Flow

M

Motor Operated Valve

Pressure Relief Valve

Vent to Pit

S

Solenoid Operated Valve

Steam Trap

Drain Funnel

H

Hydraulic Operated Valve

Filter /Strainer

Orifice

Pneumatic Operated Valve

“Y” Type Strainer

Throttle

Non Return Valve (NRV)

Two Way Valve

Siphon

FC NRV

Three Way Valve

Pressure Regulator

M

T

Motor Operated Butter Fly Valve

Butter Fly Valve (Damper) Three Way Solenoid Valve

S

Differential Pressure ( DPRV ) Regulating Valve

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

Three Way Valve

Power Cylinder Control Valve

View Glass

Blower

Motor and Pump

Blower

PART -1 PART-1

WATER WATER SYSTEMS SYSTEMS AND AND CONDENSER CONDENSER

TURBO GENERATOR IPSV

BARRING GEAR

BRG.NO2 AND THRUST BRG

CROSS AROUND PIPE

BRG.NO3 AND COUPLING

IPCV

BRG.NO-5

BRG.NO-6 AND COUPLING

BRG.NO-4 AND COUPLING

BRG.NO-7

HPCV

MOP

BRG.NO1 HPSV

HP TURBINE

CRH-NRV

IP TURBINE

LP TURBINE

GENERATOR

EXCITER

HPSV HPCV IPCV

CROSS AROUND PIPE

IPSV

MAIN STEAM LINE TO HP TURBINE (MS)

CONDENSER

CW IN LINE FROM CW PUMPS CW OUT LINE TO COOLING TOWERS

COLD RE HEAT LINE TO RE HEATER (CRH) HOT RE HEAT LINE TO IP TURBINE (HRH)

HP TURBINE - 17 STAGES EXTRACTION NO.1 EXTRACTION NO.2 EXTRACTION NO.3 EXTRACTION NO.4.1 EXTRACTION NO.4.2

IP TURBINE - 12+12 STAGES

LPT-STAGE NO.5 TO LPH-1 LPT-STAGE NO.3 TO LPH-2 LPT-STAGE NO.2 TO LPH-3 IPT-STAGE NO.12 TO DEAERATOR IPT-STAGE NO.12 TO TD BFP A & B

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

EXTRACTION NO.5 EXTRACTION NO.6

LP TURBINE - 06+06 STAGES IPT-STAGE NO.7 TO HPH-5A IPT-STAGE NO.7 TO HPH-5B CRH LINE TO HPH-6A CRH LINE TO HPH-6B CRH LINE TO TD BFP A&B

01

AUXILIARY COOLING WATER SYSTEM ECW IN ECW OUT

ACW-28

ACW-14 ACW-20

PHE-B (SG)

FOR VACUUM PUMP -B

ACW-27

FOR VACUUM PUMP -A

PHE-A (SG)

ACW-26

ACW-25

VACUUM PUMPS SEAL WATER COOLERS

ACW-22

ACW-15 ACW-21

ACW-23

ACW-16

TO CW SYSTEM

ACW-17

PHE-C (TG)

ACW-18

PHE-B (TG)

ACW-19

PHE-A (TG)

ECW IN ACW-29

ACW-31

LP TURBINE

DEBRIES VALVE-B

DEBRIES VALVE-A

ECW OUT

LPH-1

ACW-C

ACW-24

ACW-9

ACW-5

ACW-2

ACW-A

ACW-11

SCS-GEAR MOTOR

M

ACW-13

ACW-8 ACW-30

SCS-GEAR MOTOR SCS-STRAINER

CW OUTLET

CW INLET

COOLING TOWER-7B

COOLING TOWER-7A

ACW-B

ACW-12

ACW-6

ACW-3

ACW-10

M

SCS-STRAINER

LEFT

M

M

CONDENSER RIGHT

DRAIN

ACW-7

FROM CW SYSTEM

M ACW-1

CW PUMP HOUSE

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

ACW-4

SCS - FLUSHING PUMPS

ACW PUMP HOUSE – UNIT-7

02

ECW PUMPS AND PHE SYSTEM SODIUM HYDRAXIDE DOSING TANK

ECW SUPPLY HEADER(T.G) ECW TANK -TG

ECW-109

ECW-75 MAKEUP TO ECW SYSTEM

ECW TANK -SG

ECW RETURN HEADER(T.G) MAKEUP TO ECW SYSTEM

ALL ECW PUMPS SUCTION AND DISCHARGE LINES HAVE DRAIN LINES. AND DISCHARGE LINE HAVE VENT LINE BEFORE VALVE ALL PHE RAW WATER AND DM WATER INLET OUTLET HAVE DRAIN LINES AND ALL HEADERS HAVE VENT LINES

M

ECW-8

ACW IN

ECW-13 ECW-10

PHE-A

TO VACUUM PUMP HEAT EXCHANGERS

ECW-116

M

ECW-7

ECW-5

ECW-17

ECW-114 ECW-115 ECW-113

TG-A

ECW-2

ECW-4

TG-B

SHORT R/C

ECW-1

LONG R/C

ACW OUT

ECW-14

PHE-B

ECW-11

ECW-15 ECW-6

M

PHE-C

ECW-9

ECW-79

ECW-77 SHORT R/C

M

PHE-A

ECW-83

ECW-80

ECW-99

M

ECW-81

ECW-12

FROM BFP COOLERS TO BFP COOLERS

SG-B

SG-A

TG-C

ECW-3

ECW-85 ECW-78

ECW-98

ECW-82 ECW-96

ECW-84

PHE-B ECW-86

LONG R/C LINE

ECW-95

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

ECW SUPPLY HEADER(S.G) ECW RETURN HEADER (S.G)

ECW-97

03

ECW SYSTEM ( FULL VIEW ) MOT COOLERS

CFT COOLERS

SEAL OIL COOLERS (H2)

P.W. COOLERS

FROM EQUIPMENTS TO PUMPS

COMPRESSOR

SEAL OIL COOLERS (AIR) MOT CENTRIFUGE

GENERATOR H2 COOLERS

TO EQUIPMENTS

M

ECW-B

M

ECW-C

PHE-C (TG)

MAKE UP LINE DOSING LINE

SHORT R/C

M

ECW-A

LONG R/C

EXCITER

PHE-B (TG)

DOSING LINE

V / PUMPS

MAKE UP LINE FROM ECW TANK FROM ACW SYSTEM TO CW SYSTEM

S

SHORT R/C LONG R/C

CEP BRG. COOLING LINE

S

T.D.BFP

T.D.BFP

TD BFP MOT CENTRIFUGE TD BFP MOT CENTRIFUGE

TD BFP MOT COOLERS

M.D.BFP

TD BFP MOT COOLERS

MD BFP-W/O COOLERS

MD BFP-L/O COOLERS

ECW-B (SG)

M

PHE-A (SG)

M

M

CEP-B CEP-A

MAKEUP /FILL LINE

PHE-A (TG)

ECW-A (SG)

CEP-C

PHE-B (SG) TO EQUIPMENTS (SG) FROM EQUIPMENTS (SG)

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

TO COT /DOT CENTRIFUGE

04

ECW-65

ECW-62 M

ECW-63

ECW-64

ECW-106

M ECW-103

ECW-104

ECW-101

DMV-75

MAKEUP LINE TO ECW SYSTEM (SG)

NAOH TANK FILL /MAKEUP LINE ECW TANKS EMERGENCY MAKEUP LINE

CST FILL AND MAKEUP LINE FROM DM WATER MAKEUP PUMPS

ECW-105

ECW-99 ECW-100

ECW TANK BOILER

ECW TANKS NORMAL FILL AND MAKEUP LINE

DMV-41 M

ECW-102

M

ECW-67

ECW-68

MAKEUP LINE TO ECW SYSTEM (TG)

M

ECW TANK TURBINE

ECW-69

DM MAKEUP WATER PUMPS

ECW-66

DM MAKEUP AND CST CONNECTIONS

PRIMARY WATER SYSTEM MAKEUP LNE

LP TURBINE

DMV-72

NaOH BREATHER CDV-46

GRAVITY MAKEUP LINE TO CONDENSER

R/C LINE TO CS TANK M DMV-65 DMV-55

DMV-38

CONDENSER

CEP- C , B , A

M DMV-40 DMV-46

DMV-45

DMV-48

SAMPLE LINE

DMV-54

CTP-A

DMV-82

DMV-60

M

HOTWELL NORMAL MAKEUP AND FILL LINE FROM DM MAKEUP WATER PUMPS GSC

DMV-47 CTP-B

SEAL POT

LPH-1

DMV-63

DMV-43

CONDENSATE STORAGE TANK

CDV-47

HOTWELL EMERGENCY MAKEUP AND FILL LINE

DMV-49

CDV-43

M

M

DMV-50

CST PUMP HOUSE /COMPRESSOR HOUSE

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

CDV-45

CONDENSATE SPILL LINE

CEP DISCHARGE HEADER TO LP BY PASS SPRAY CONDENSATE LINE TO LPH-1

05

CEP CONNECTIONS CEP-A CONNECTIONS

LPFT

CEP MINIMUM RECIRCULATION LINE TO CONDENSER CEP-C DISCHARGE VENT CEP-B DISCHARGE VENT

DISCHARGE VENT

CONDENSER

ECW IN ECW OUT

CEP-C

BEARING

VIEW GLASS CEP CANSTER BOX

CSV-1

STRAINER

CDV-10

CDV-11

CEP-A MOTOR

EXPANSION BELLOW

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

CEP SEAL WATER LINE CEP MIN R/C LINE

CEP DISCHARGE HEADER

TO CEP-B AND CEP-C

CDV-4 M CDV-1

M

CDV-7

TO HEATERS

BALANCING LINE (SUCTION VENT /CANSTERVENT)

S

CEP SUCTION HEADER

CEP-B

06

EXHAUSTHOOD SPRAY

DEAERATOR

MAL VALVES FT SPRAY

CDV-47

M

LP TURBINE

CDV-49

CEP GLAND SEALING

CDV-43 CDV-18

M

CDV-45

M CDV-27

CDV-32

LPH-2

CDV-24

NH3 DOSING LINE N2H4 DOSING LINE

CDV-22

M

CDV-26

M

CDV-25

CDV-21

CDV-23

M

CPU

CDV-50

CDV-20

TO BOILER FILL LINE

M

TO NH3 AND N2H4 DOSING

M

CDV-72

TO VALVE GLAND SEALING (CDV 151 TO 200)

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

CDV-55

TO SCAPH SPRAY

CDV-54

CDV-31 IBV

CDV-34 IBV

CDV-60

CDV-31

M

M

CDV-34

CDV-30

CDV-85

DUMP LINE

M

M

GSC

GSC MIN R/C

M

CDV-36

CDV-42

CDV-7

CDV-17 CDV-16

SAMPLE LINE

LPH-3

CDV-44

CSV-1 M

CDV-4

CDV-8

CDV-1

CDV-2

CDV-10

CDV-11

CSV-2 CDV-12

M

CDV-5

CDV-9

M

CDV-6

CDV-28 IBV

M

CDV-33

M

CEP-A

CDV-38 CDV-39

CDV-35

M

CDV-40

M

M

CEP-B

CDV-3

CEP SUCTION HEADER CDV-41

CDV-13

CSV-3

CDV-15

CDV-14

M

CDV-29

DRV-48

CEP-C

CDV-28

M

CONDENSER

M

CDV-46

CEP-A MIN.R/C

DRAIN TO UFT

M

CONDENSATE FLOW ORIFICE

LPH-1

OVERFLOW AND DRAIN TO LPFT

CST

DRAIN COOLER

EXCESS CONDENSATE TO CST

FEED STORAGE TANK

LP BYPASS SPRAY LINES

CDV-71

CDV-37

CONDENSATE SYSTEM

07

FEED WATER SYSTEM BOILER DRUM ECONOMISER

TD BFP-A R/C LINE

FCV02

TD BFP-B R/C LINE

TO SUPER HEATER SPRAY

FCV-07

DEAERATOR

TO RE HEATER SPRAY

FCV-06

FCV-09

FCV-04

FCV-08

AD AMMONIA DOSING

FEED STORAGE TANK

HD HYDRAZINE DOSING

CHDV-13 M

CHDV-11

CHDV-07

CHDV-12

M

M

FDV-24

FDV-18

FDV-23

FDV-17 FDV-01

FDV-04

M

TDBFP-A TURBINE

FCV-01

M

FDV-02

FDV-03

FDV-06

M

M

M

FDV-13

CHDV-05

HD

MAIN PUMP

M

FDV-14

BFP DISCHARGE HEADER

M

FSV-01

FDV-26 FDV-25

MAIN PUMP FCV-03

M

FDV-15

TO APRDS SPRAY

FDV-09

M

M

M

FDV-11

M

HP HEATER –5A

M

100% FLOW LINE

M

HP HEATER –6A

M

HP HEATER –5B

M

50%BYPASS

FDV-08

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

100%BYPASS

TO BOILER FILL LINE

M

M

M FOR BFP CONNECTIONS – SCHEME NO. 24 AND 25

FDV-12

M

FDV-07

M

FDV-16

TO BOILER DRUM THROUGH ECONOMISER

FDV-20

FSV-02

FDV-28 FDV-27

TURBINE

FCV-05

TO HP BYPASS SPRAY LINE 30% FLOW LINE

M

HD

CHDV-06

TDBFP-B

MAIN PUMP

R/C LINE

AD

M

FDV-05

MOTOR

FDV-22

MDBFP-C

FDV-21

FSV-03

HD

M

FDV-19

M

AD

M

AD

HP HEATER –6B

M FDV-10

08

GSC BLOWER CONNECTIONS ATMOSPHERE

GSC BLOWER-A MAW80 AA011 M

ATMOSPHERE

M

GSC BYPASS TO ATMOSPHERE

MAW80 AA012 MAW80 AA007A

GSC BLOWER-B

M

M

AIR AND UNCONDENSABLE GASES TO ATMOSPHERE

IPT

LPT CDV-16

TD BFP SEAL STEAM EXHAUST TO GSC

CONDENSER

GLAND STEAM CONDENSER

CDV-18

STRAINER

LP FLASH TANK

SEAL STEAM EXHAUST TO GSC

M

M

MAW80 AA001A

HPT

MAW80 AA 001

MAW80 AA007

CDV-17

DRIP LINE TO LPFT

CEP-C

TD BFP-A

CEP-B

CEP-A

LINE FOR INITIAL DRAINING (DRIP)

TO HEATERS

TD BFP-B

CEP DISCHARGE HEADER

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

09

COLTCS LINE TO CW SYSTEM

VACUUM PUMP COOLERS

ECW-PHE

COLTCS LINE TO BALL MONITERING SYSTEM

LPH-1

ACW SYSTEM MESH FOR STOPPING OLTCS BALLS

ARV (CW-5)

ARV (CW-6) M

M

ACW RETURN WATER TO CW RETURN LINE

CIRCULATING WATER SYSTEM

CW-3 M

M

M

CW-4 M

M

CONDENSER

CW-2

PASS-B

M

CW-1

CW LINE - CW PUMPS TO CONDENSER

COLTCS LINE TO CW SYSTEM COLTCS LINE TO BALL MONITERING SYSTEM

COLTCS = CONDENSER ONLINE TUBE CLEANING SYSTEM STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

PASS-A

CW LINE CONDENSER TO CT

ARV=AIR RELIEF VALVE

10

COLTC SYSTEM CW LINE PASS A IN /OUT

BALLS M

CW LINE TO CONDENSER

CW LINE FROM CONDENSER

BALL SEPARATOR MOTOR

BALLS

M

CW LINE TO CONDENSER BALLS

BALLS

M

M

MESH

S

MESH

BALL MONITER

S

CW LINE FROM CONDENSER

CW LINE PASS B IN /OUT

BALL MONITER

M

M

M

M

BALL VESSEL BALL CIRCULATION PUMP AND MOTOR STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

BALL VESSEL BALL CIRCULATION PUMP AND MOTOR

11

CONDENSER CONNECTIONS

LPH-2 VENT LPH-1 VENT

MAL VALVES FT VENT MAL VALVES FT VENT SDFT VENT TD BFP-A EXHAUST TD BFP-B EXHAUST LEAK STEAM DRAIN HPT EVACUATION LINE FROM CPU SYSTEM (RINSING LINE)

HOTWEL LEVEL TRANSMITTER LINE MAL VALVES FT DRAIN MAL VALVES FT DRAIN

LPH-1

EXHAUST HOOD SPRAY LPH-3 VENT NORMAL HOTWEL MAKEUP LINE EMER- HOTWEL MAKEUP LINE (CST) GSC MIN.RECIRCULATION LINE VACUUM BREAK LINE VACUUM PUMP SUCTION LINE VACUUM PUMP SUCTION LINE HPFT VENT LPBP LINE LPBP LINE LPFT VENT CEP –A RE CIRCULATION LINE CEP –B RE CIRCULATION LINE CEP –C RE CIRCULATION LINE CEP –A VACUUM BALANCING LINE CEP –B VACUUM BALANCING LINE CEP –C VACUUM BALANCING LINE HOTWEL LEVEL TRANSMITTER LINE HPFT DRAIN LPFT DRAIN

SDFT DRAIN HOTWEL DRAINS CEP SUCTION LINE

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

HOTWEL DRAINS CEP SUCTION LINE

12

CONDENSER AIR EVACUATION SYSTEM –V / PUMP

LP TURBINE

EXHAUST WITH SILENCER

S

LEVEL GAUGE

AIR EJECTOR

S

TANK OVERFLOW

SMV-26

SMV-23

SMV-25

SEPARATOR TANK

AIR FLOW MEASUREMENT DEVICE

SMV-24

CONDENSER

S HOTWEL LEVEL TRANSMITTER PIPES

TO VACUUM PUMP-2

S

MAKEUP LINE ( FROM ECW )

VACUUM BREAKER VALVE

VACUUM PUMP VACUUM PUMP

SEAL WATER CIRCULATION PUMP

ACW OUT

SEALING LIQUID IN

HEAT EXCHANGER

MOTOR

VENT AT NEAR LPBP(8.5) ACW IN

HEAT EXCHANGER OUTLET TO CW OUTLET(L) DUCT

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

13

CONDENSATE POLISHING UNIT FROM CEP DISCHARGE

TO DM PLANT FROM DM PLANT

S

S

S

S

S

S

TO LP HEATERS

TREATED CONDENSATE

S

CPU VESSEL-2 S

CPU VESSEL-1

S

S

M

S

S

S S S

S

S

S

S

S

S

S

S

S

S S

CDV-51

S

TO CONDENSER HOTWEL

COMPRESSOR STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

MOTOR

14

SERVICE WATER SYSTEM TURBINE SIDE SERVICE WATER SYSTEM FOR CLEANING AND GENERAL PURPOSE

TO ABOVE 17 meters

TO ABOVE 17 meters

FOR TOILET ROOMS

17

17

8.5

0

CHILLER ROOM

FOR TOILET ROOMS

8.5

TO ABOVE 17 meters

8.5 0

17

17 8.5

8.5 TO H2 FILL ROOM

0

0

CONDENSER

COMPRESSOR HOUSE

SERVICE WATER PUMP HOUSE

0

STEPS

WAY

TO ABOVE 17 meters

ECW PUMPS

CST

STEPS

TO ABOVE 17 meters

CFT ROOM 17 8.5 0

STEPS

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

STEPS

15

PART -2 PART-2

STEAM STEAM SYSTEMS SYSTEMS AND AND HEAT HEAT EXCHANGERS EXCHANGERS

HP TURBINE STEAM CIRCUIT STRAINER

TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)

DRAIN TO SDFT DRAIN TO UFT

HPCV-1

I SEAL RING LEAK OFF LINE TO SS HEADER BALANCING LINE TO IP-LP CROSS AROUND

TO /FROM SEAL STEAM HEADER (SPINDLE LEAK) U SEAL RING LEAK OFF LINES TO SS HEADER

HP TURBINE

HPCV-2

HPT EVACUATION LINE TO CONDENSER

HPSV-2

TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)

DRAIN TO MAL VALVES FT TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)

CRH NRV

HPT CASING DRAIN TO MAL VALVES FT

TD BFP TURBINE -A

DRAIN TO SDFT

STRAINER DRAIN TO UFT

DRAIN TO MAL VALVES FT

HPSV-1

TD BFP TURBINE -B

DRAIN TO MAL VALVES FT

EXTRACTION NO.6

DRAIN TO SDFT HPBP LINES

TO A.S.HEADER (APRDS) TO DEAERATOR

HPH-6A

HPH-6B

TO SEAL STEAM

TO APRDS

TO RE HEATER MS LINE TO HPT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

16

IP TURBINE AND LP TURBINE STEAM CIRCUIT

LPBP LINE(L)

TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)

WARMUP LINE

DRAIN LINE TO MALVALVES FT U SEAL RING LEAK OFF LINES TO SS HEADER BALANCE LINE TO IP-LP CROSS AROUND

IPSV-1

CROSS AROUND PIPE IPCV-1

DRAIN LINES TO MALVALVES FT

WARMUP LINE

IP TURBINE

LP TURBINE

IPCV-2

EXTRACTION NO.1 (FOUR LINES) DRAIN LINE TO MALVALVES FT

IPSV-2

STRAINER

LPBP LINE(R)

DRAIN LINE TO SDFT DRAIN LINE TO UFT

STRAINER

LPH-1

EXTRACTION NO.2

TO /FROM SEAL STEAM HEADER (SPINDLE LEAK)

EXTRACTION NO.3 LPH-3

DRAIN LINE TO SDFT DRAIN LINE TO UFT

EXTRACTION NO.5

LPBP VALVES WARMUP LINE

HRH LINE TO IPT

EXTRACTION NO-4.1 TO DEAERATOR

HPH-5A

HPH-5B

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

CONDENSER

LPH-2

EXTRACTION NO-4.2

TD BFP TURBINE -A

TD BFP TURBINE -B

17

HP HEATERS EXTRACTIONS AND DRIPS DEAERATOR

DRV-22

FEED STORAGE TANK

DRV-11 HP TURBINE

IP TURBINE

DRV-5

LP TURBINE

CRH NRV

DRV-25

M

M

EXV-33

EXV-34

EXV-22

EXV-21

HPH-5A

DRV-8

NORMAL DRIP HPH-5B TO D/A NORMAL DRIP HPH-5A TO D/A

EXTRACTION NO.6

ALTERNATE DRIP HPH-5A TO HPFT

M

HPH-5B

M

EXV-147

EXV-102

CONDENSER

M

CRH LINE TO TDBFP

HPFT

M

EXV-101

LINE DRAINS

DRV-18

MAL-47

EXV-10

MAL VALVES FT

EXTRACTION NO. 5

CRH LINE TO REHEATER

DRV-15

EXV-09

ALTERNATE DRIP HPH-5B TO HPFT

DRV-2

EXV-26

EXV-24

M

EXV-25

M EXV-23

LINE DRAIN

LINE DRAIN

HPH-6B NORMAL DRIP HPH-6B TO 5B

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

HPH-6A

ALTERNATE DRIP ALTERNATE DRIP HPH-6A TO HPFT HPH-6B TO HPFT

NORMAL DRIP HPH-6A TO 5A

18

LP HEATERS EXTRACTIONS AND DRIPS

LP TURBINE

EXTRACTION NO.3

EXTRACTION NO.2 EXTRACTION NO.1(FOUR LINES)

EXV-118 M

EXTRACTION LINE DRAINS

EXV-119 M

DRV-37

LPFT

CONDENSER

DRV-31

NORMAL DRIP LPH-1 TO DRAIN COOLER

MAL VALVES FT

NORMAL DRIP LPH-2 TO LPH-1

DRV-34

LPH-1

MAL-55 M

EXV-03 EXV-04

MAL-54

EXV-02

M

M

M

EXV-12

EXV-01

DRV-28

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

DRAIN COOLER

EXV-11

LPH-2

LPH-3

EXTRACTION LINE DRAINS NORMAL DRIP LPH-3 TO LPH-2

ALTERNATE DRIP LPH-2 TO LPFT

ALTERNATE DRIP LPH-3 TO LPFT

19

LPH AND HPH AIR VENTS AND DRAINS CONDENSATE OUTLET SMV-20

M

SMV-19

SMV-21

LPH-1 LPH-1 SMV-18

SMV-06

SMV-09

SMV-12

SMV-16

M

HPFT

SMV-17

SMV-15

LPH-2

SMV-03 CONDENSATE INLET

HPH 6B

SMV-01

M

SMV-02

SMV-05

SMV-04

M

SMV-14

M

SMV-13

ORIFICE

LPH-3

HPH 6A

HPH 5A

SMV-07

SVD FT

HPH 5B

M

FEED WATER LINES

SMV-08

SMV-11

SMV-10

M

CONDENSATE INLET

TO ATM

DRAIN TO PIT

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

20

HP BY PASS SYSTEM HPSV-1 HPCV-1

HP TURBINE

IP TURBINE

LP TURBINE

CRH-NRV HPCV-2 DRAIN LINES TO UFT

HPSV-2

LPH-1 VENT TO ATM BPV-101

M

UFT

M

CONDENSER

DRAIN TO PIT

BPV-04

BPE-01

H

HP BY PASS ATTEMPRATION LINE

H

BP-1

BPV-06

BPV-05

M

BPV-03 M

BPV-102

BFP DISCHARGE HEADER

H

FEED WATER TO HPHEATERS

BD-01

H

BP-2

BPE-02

H

BPV-07

WARM UP LINES CRH LINE TO RE HEATER MS LINE TO HP TURBINE

HP BY PASS VALVES HP BY PASS LINES TO CRH LINE

TDBFP-A

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

TDBFP-B

MDBFP-C

21

LP BY PASS SYSTEM WARM UP LINE

LP BYPASS LINES

IPCV LPBP LINE DRAINS

LPBP CV-SV(R)

LP BYPASS SPRAY VALVES CONTROL RACK

TO EXHAUST HOOD SPRAY

IPCV

LP TURBINE

SDFT

M

HRHV-110

IPSV

HRHV-114

IP TURBINE

M

HP TURBINE

M

HRHV-109

SEAL STEAM HEADER

M

IPSV

TO MAL VALVES F.T. SPRAY

M

HRHV-113

LPBP VALVES SPINDLE LEAKOFF LINES

HRH LINE TO IP TURBINE

CEP A,B,C

WARM UP LINE LPBP CV-SV(L) LINE DRAINS LP BY PASS SPRAY LINE GSC

CEP DISCHARGE HEADER M

CST

CONDENSATE LINE TO CPU AND LPH-1

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

LP BY PASS WATER INJECTION VALVES

CONDENSER

22

SEAL STEAM SYSTEM SEAL STEAM EXHAUST HEADER TO GSC BLOWER

LPBP LINES TO CONDENSER U SEAL RING LEAKOFF LINES

FROM TD BFP TURBINE SEAL STEAM EXHAUST HPSV-1

LEAK STEAM TO IPT EXHAUST

HPCV-1

GSC

U SEAL RING LEAKOFF LINES

IPSV,CV -1 HP TURBINE

LP TURBINE

IP TURBINE

IPSV,CV -2

HPCV-2

LPBP CV, SV

LEAK STEAM TO IPT EXHAUST HPSV-2

M

CONDENSER

HPT EVACUATION VALVE HPCV,SV AND IPCV ,SV SPINDLE LEAK OFF LINES

SEAL STEAM HEADER MAW 15AA001

MS LINE TO HPT

M

CRH LINE TO RH

M

HRH LINE TO IPT A.S /CRH LINE TO SSH

MAW 55AA001

M

MAW 10AA001

M

H

MAW 10AA010

DRN TO HPFT

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

LPBP CV AND SV SPINDLE LEAKOFF LINES

MAW 50AA001

MAW 50AA010

H

EXCESS SEAL STEAM TO CONDENSER

DRN TO MAL FT

23

DMV-34 DMV-35

CBD EXV-14

ASV-11

DEAERATOR FCV-09

EXTRACTION NO.4.1 TO TDBFP A&B

LPH-1

TO UFT D/A OVERFLOW

CRHV-06 CRHV-05

TO LPFT

R/C LINE

FSV-01

FSV-02

FSV-03

CRHV-159

M

CRHV-08 M

M

MAL VALVES FT

M

CRHV-09

TO SVD FT

EXV-13

EXV-06 EXV-05

M

ASV-10

CONDENSER MAL-51

TO LPFT

EXV-115

M

ASV-09

TO SVD FT

EXTRACTION NO.4.2 TO DEAERATOR

FCV-07

FCV-04

DRV-48

ASV-05

ASV-06 M ASV-08

T

FCV-06

FEED STORAGE TANK

DRV-15 DRV-16 DRV-14

T

FCV-02

FCV-08

DRV-22 DRV-21 DRV-23

ASV-07

CONDENSATE LINE TO DEAERATOR

VACUUM BREAKER LINE

M

DEAERATOR FILL LINE

SMV-22

DEAERATOR CONNECTIONS

TO LPFT

R/C LINE

R/C LINE

CRHV-115

M

ASV-44

CRHV-07

TO HPFT

MDBFP

A.S.TO DEAERATOR PEGGING

CRH TAPPING TO D/A PEGGING M

CRH LINE TO REHEATER

FCV-05

TDBFP-B

HPH-5B

FCV-03

DRV-20

FCV-01

DRV-13

TDBFP-A

HPH-5A

ASV-70 ASV-69

CRH LINE TO SEAL STEAM SYSTEM HPH-5A NORMAL DRIP TO D/A HPH-5B NORMAL DRIP TO D/A

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

HPH-6B

HPH-6A

24

AUXILIARY STEAM SYSTEM TAPPING FROM M.S.LINE

SPRAY LINE FROM BFP DISCHARGE HEADER

ASV-21

TO DEAERATOR PEGGING

SPRAY LINE FDV-29 FDV-30 FDV-31 M FDV-32

M

TO SVDFT FDV-49

ASV-36

ASV-37

UNIT LT AUX.STEAM HEADER

T

FDV-33

FDV-34 FDV-35

FDV-37

FDV-38 FDV-39

M

ASV-22

ASV-164 M

ASV-49

FDV-36

ASV-163

TO IBD ASV-62

M

TO SVDFT

ASV-47

M

T

ASV-48

FDV-46 FDV-47 FDV-48

M

ASV-23

FDV-41

ASV-44

TO SCAP /ATOMIZATIOM

ASV-24

M

FDV-43

STATION LT AUX.STEAM HEADER

TO FOPH ASV-60

T

TO SVDFT M

ASV-51

UNIT HT AUX.STEAM HEADER

TO SVDFT

ASV-32

ASV-33

ASV-56

ASV-39

TO SVDFT

M

ASV-40

T

TO AH SOOT BLOWING

TAPPING FROM CRH LINE

TO TD BFP ASV-67 ASV-68

FDV-42

TO /FROM UNIT-6

TO A/C PLANT TO S.S SYSTEM ASV-69 M ASV-70

SPRAY LINE

TO MILL INERTING

CRH LINE TO S.S HEADER

ASV-34

FDV-40

ASV-35 M

M

ASV-41

M

ASV-50

M

TO SVDFT

ASV-27

ASV-26 ASV-25 M

ASV-31 ASV-30

ASV-29 ASV-28 M M

T

T

TO SVDFT

MS LINE TO HPT CRH LINE TO RH HRH LINE TO IPT

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

25

MAL VALVES FLASH TANKS (BOX) CONNECTIONS SPRAY LINE

A

SPRAY LINE

C

B

D

E

G

I

H

M M

M

M

M

M

M

J

M

K

M

L

M

M

M

N

M

M

F FLASH BOX (TANK) -1 ( GT SIDE )

M

FLASH BOX (TANK) -2 ( BOILER SIDE )

CONDENSER

A B

DRAIN BEFORE HPCV-1 (MAL 11 AA011) DRAIN BEFORE IPCV-1 (MAL 26 AA011)

16

C D E F

DRAIN AFTER IPCV-1 (MAL 31 AA011) DRAIN AFTER IPCV-2 (MAL 32 AA011) HPT CASING DRAIN (MAL22 AA011) DRAIN BEFORE CRH NRV (MAL 65)

17

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

17 17 16 16

G H

DRAIN BEFORE HPCV-2 (MAL 12 AA011) DRAIN BEFORE IPCV-2 (MAL 27 AA011)

16

I J K L M N

SEAL STEAM DRAIN (MAL 81 AA011) EXTRACTION NO-2 DRAIN (MAL 55 AA011) EXTRACTION NO-3 DRAIN (MAL 54 AA011) EXTRACTION NO-4.2 DRAIN (MAL 52 AA011) EXTRACTION NO-4.1 DRAIN (MAL 51 AA011) EXTRACTION NO-5 DRAIN (MAL 47 AA011)

23

17 19 19 34 24 18

26

HP FLASH TANK CONNECTIONS B

SPARE

M

A

C

D

E M

F M

T

T

G M

H M

T

I M

T

T

J M

P

M

T

Q

L

T

M SPARE

M

M

T

N

M

O

M

S

T

DRV-6

K

R

DRV-5

DRV-4

T

DRV-11

HPFT

M

T

DRV-12 DRV-26

DRV-19

DRV-10 DRV-18 DRV-24 DRV-25

DRV-17

U

CONDENSER

V

W

A

EXV-147 ( EXTRACTION NO.5 LINE DRAIN )

18

M

CRHV-129 (CRH TO TDBFP-B LINE DRAIN BEFORE BLOCK VALVE)

B

TDBFP-A GLAND SEAL STEAM LINE DRAIN (GS-20)

34

N

EXV-101 (EXTRACTION NO.6A LINE DRAIN) 18

C

TDBFP-B GLAND SEAL STEAM LINE DRAIN (GS-20)

34

O

EXV-102 (EXTRACTION NO.6B LINE DRAIN) 18

D

ASV-152 (MAIN TURBINE GLAND SEAL STEAM LINE DRAIN )

23

P

AIR VENT OF HPH- 6A

20

E

ASV-104 ( TDBFP-A AUX.STEAM LINE DRAIN BEFORE BLOCK VALVE) 34

Q

AIR VENT OF HPH- 6B

20

F

ASV-109 ( TDBFP-B AUX.STEAM LINE DRAIN BEFORE BLOCK VALVE) 34

R

AIR VENT OF HPH- 5A

20

G

CRHV-135 ( STEAM DRAIN OF BFP-A TURBINE )

34

S

AIR VENT OF HPH -5B

20

H

CRHV-141 ( TDBFP-A LINE DRAIN BEFORE ESV )

34

T

HPH- 6A EMERGENCY DRIP

18

I

CRHV-145 ( STEAM DRAIN OF TDBFP-B TURBINE )

24

U

HPH- 6B EMERGENCY DRIP

18

J

CRHV-153 ( TDBFP-B LINE DRAIN BEFORE ESV )

34

V

HPH- 5A EMERGENCY DRIP

18

K

CRHV-115 ( CRH TO D/A PEGG. LINE DRAIN )

24

W

HPH- 5B EMERGENCY DRIP

18

L

CRHV-122 ( CRH TO TDBFP-A LINE DRAIN BEFORE BLOCK VALVE )

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

34

34

27

LP FLASH TANK CONNECTIONS

F

G

H

DRV-30

DRV-36

DRV-31

DRV-37

DRV-32

DRV-38

V U

DRV-48 DRV-47 DRV-49

T

DRV-51

A

C

B M

D

M

M T

I J K L

E

M T

M T

M DR-1

M

S

LPFT

R Q

M DR-02

P

M DR-2

N

CONDENSER

M DR-01

O

A CRHV-159 ( CRH TO D/A PEGGING LINE DRAIN )

24

I

TD BFP-A LEAK STEAM LINE

34

Q

GSC DRIP LINE

09

B EXV-109 ( EXTRACTION NO 4.2 LINE DRAIN )

34

J

TD BFP-B LEAK STEAM LINE

34

R

DRAIN COOLER DRIP LINE

19

C EXV-105 ( EXTRACTION NO 4.1 LINE DRAIN )

24

K

SCAPH DRAIN LINE ( PRIMARY )

S

A/C PLANT DRAIN LINE (STEAM)

D EXV-118 ( EXTRACTION NO. 3 LINE DRAIN )

19

L

SCAPH DRAIN LINE ( SECONDARY )

T

CEP-A DISCHARGE VENT LINE

06

E EXV-119 ( EXTRACTION NO .2 LINE DRAIN )

19

M DR-1 ( TDBFP-A TURBINE DRAIN )

34

U

CEP-B DISCHARGE VENT LINE

06

F LPH-3 EMERGENCY DRIP LINE

19

N

DR-2 ( TDBFP-A TURBINE DRAIN )

34

V

CEP-C DISCHARGE VENT LINE

06

G LPH-2 EMERGENCY DRIP LINE

19

O

DR-01 (TDBFP-B TURBINE DRAIN )

34

H DEAERATOR OVER FLOW AND DRAIN LINE

24

P

DR-02 (TDBFP-B TURBINE DRAIN )

34

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

28

SDFT AND UFT CONNECTIONS DEAERATOR DRAIN

MS LINE STRAINER DRAIN (LEFT) VENT TO ATMOSPHERE

MSV 110 M

HRHV 113 M

SDFT CONDENSER HRHV 114 M

HRHV 109 M

HRHV 110 M

HPBP WARMUP LINE DRAIN (RIGHT)

HRHV 106 M

HRHV 105 M CRH 101 M

HPBP WARMUP LINE DRAIN (LEFT)

HRHV 101 M

UFT

HRHV 102 M

LP BYPASS LINE DRAIN (RIGHT) MSV 106 M

BPV 102 M

MSV 105 M

LP BYPASS VALVE WARM UP LINE DRAIN (LEFT)

BPV 101 M

STEAM VENT

SPRAY LINE

MSV 109 M

MS LINE STRAINER DRAIN (RIGHT)

SPRAY LINE

DRAIN LINE TO PIT

HRH LINE STRAINER DRAIN (LEFT)

DRAIN CRH NRV AND AFTER NRV LINE DRAIN

HRH LINE STRAINER DRAIN (RIGHT)

UFT =UNIT FLASH TANK STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

LP BYPASS VALVE WARM UP LINE DRAIN (RIGHT)

LP BYPASS LINE DRAIN (LEFT)

SDFT =STEAM DRAIN FLASH TANK

29

SVD FLASH TANK CONNECTIONS SVDFT = SAVETY VALVE DISCHARGE FLASH TANK

AUX.STEAM DRAIN MANIFOLD

25 DRAIN LINES VENT TO ATMOSPHERE

H

I

J

K

F L

M

N

O

P

D

SVDFT

G E

A B

C

DRAIN TO PIT

A B C D E F G H

LPH-2 SAFETY VALVE DISCHARGE LINE

20

I

LT STATION HEADER DRAIN

25

LPH-3 SAFETY VALVE DISCHARGE LINE

20

J

A.S. TO D/A PEGGING LINE DRAIN

24

HPH-5A SAFETY VALVE DISCHARGE LINE

20

K A.S. TO D/A PEGGING LINE DRAIN

24

HPH-5B SAFETY VALVE DISCHARGE LINE

20

L LT HEADER INTERCONNECTION LINE DRAIN 25

HPH-6A SAFETY VALVE DISCHARGE LINE

20

M LT UNIT A.S. HEADER LINE DRAIN

25

HPH-6B SAFETY VALVE DISCHARGE LINE

20

N HT UNIT A.S. HEADER LINE DRAIN

25

LT PRDS SAFETY VALVE DISCHARGE LINE

25

O LT PRDS D/S LINE DRAIN

25

HT PRDS D/S LINE DRAIN

25

P

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

30

PART -3 PART-3

BOILER BOILER FEED FEED PUMPS PUMPS

MD BFP - SEAL AND COOL WATER LINES ECW IN ECW OUT

ECW-46

COOLER

HYDRAULIC COUPLING

SEAL WATER LINES JACKET COOLING LINES

ECW-44

BOOSTER PUMP

MOTOR

MAIN PUMP

COOLER ECW-45

ECW-43

MAGNETIC FILTERS

ECW IN

JACKET COOLING LINES ECW OUT

MAGNETIC FILTERS

SEAL WATER COOLERS

SEAL WATER COOLERS

ECW-52 ECW-51

ECW IN STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

ECW-37

ECW OUT

ECW-36

ECW IN

31

MD BFP – FEED WATER AND OIL SYSTEM CHDV-13 M

FSV-03

STRAINER

FDV-22

RE HEATER ATTEMPRATION CONICAL FILTER

FDV-28 FCV-05

M

CHDV-07

M

M

FDV-06

MAIN PUMP DISCHARGE HYDRAZINE DOSING

SUPER HEATER ATTEMPRATION

AMMONIA DOSING RE CIRCULATION LINE TO DEAERATOR

BOOSTER PUMP SUCTION LINE FROM DEAERATOR

LUB OIL FILTERS BOOSTER PUMP

LUB OIL PUMP

COUPLING

MOTOR

HYDRAULIC COUPLING

COUPLING

MAIN PUMP

VIEW GLASS

BALANCING LINE

M

ECW-38

ECW OUT FROM COOLER

L/O COOLER

W/O COOLER

ECW IN TO COOLER

W/O COOLER

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

ECW IN TO COOLER

L/O COOLER

ECW OUT FROM COOLER

32

TD BFP-A FEED WATER SYSTEM TD BFP-A = TD BFP-B VALVE NUMBERS FSV-01 = FSV-02 FDV-04 = FCV-05 FDV-24= FCV-26 CHDV-05 = CHDV-06

FCV-01 = FCV-03 FDV-18= FCV-20 CHDV-11 = CHDV-12

TO BFP DISCHARGE HEADER RECIRCULATION LINE TO DEAERATOR SUPER HEATER SPRAY RE HEATER SPRAY

BOOSTER PUMP

BARRING GEAR GEAR BOX

MAIN PUMP

FDV-24

FDV-18

TURBINE

BALANCING LINE CONICAL STRAINER

FCV-01

FSV-01 CHDV-11

STRAINER

M

M

CHDV-05

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

AMMONIA DOSING

FDV-04 M

HYDRAZINE DOSING M

33

TD BFP-A TURBINE STEAM CIRCUIT CRHV-12

EXHAUSTHOOD SPRAY

TO ATM

M

M

VENT TO ATM

EXV-31

CRHV-141

M

TO TD BFP-B

TO TD BFP-B

M

CRHV-122

TO TD BFP-B

MCV

TO HPFT

M

CRHV-01

M

ESV

SEAL STEAM EXHAUST LINE

ACV

TO HPFT

FROM A.S.HEADER

GLAND SEAL STEAM M

TO HPFT

SEAL STEAM EXHAUST LINE

LEAK SEAL STEAM

M

TO HPFT

EXT.NO-4.1 CONDENSER

M

GS-20

GSCV

M

GS-03

EXV-27 M

MAL-52

M

TO MAL FT

CRH LINE TO RE HEATER

DR-1 M

TO HPFT TO LPFT

TO LPFT

TO LPFT

TD BFP-A = TD BFP-B VALVE NUMBERS

EXV-109 M

EXT.NO-6

TO HPH-6B

GS-10

M

EXHAUST LINE TO CONDENSER

EXT.NO-4.2

EXV-15

M

DR-2

RUPTURE DIAPHRM TO ATMOSPHERE M

LSCV

CRHV-135

TO GSC

FROM TDBFP-B SEAL STEAM EXHAUST

ASV-104

TO LPFT

TO HPH-6A

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

CRHV-135 = CRHV -145 EXV-31 = EXV -32

GS-20 = G.S-20

CRHV-141 = CRHV -153 EXV-27 = EXV -28 CRHV-01 = CRHV -03 ASV-104 = ASV-109

G.S=03 = G.S-03 GSCV = GSCV

CRHV-12 = CRHV-13 CRHV-122 = CRHV-129

LSCV = LSCV -

DR-1 = DR-01 DR-2 = DR-02

34

TD BFP-SEAL AND COOL WATER LINES

JACKET COOLING LINES

BOOSTER PUMP

MAIN PUMP

TURBINE

JACKET COOLING LINES

JACKET COOLING LINES

MAGNETIC FILTERS

MAGNETIC FILTERS

SEAL WATER COOLERS

ECW-27

ECW-25

SEAL WATER COOLERS ECW IN ECW OUT

ECW-26

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

ECW-24

FOR TDBFP-B ECW 24=ECW 30, ECW 25=ECW 31, ECW 26=ECW 32, ECW 27=ECW 33

35

TD BFP – MOT CONNECTIONS RETURN OIL FROM BEARINGS TO MOT COOLER VENT LINE OIL TRAP

LUB OIL HEADER TO BEARINGS COOLER-BOTTOM

LUB OIL TO BEARINGS TO ATMOSPHERE

JACKING OIL

COOLER-TOP

EMERGENCY OIL TO BEARINGS

FROM RESERVE OIL TANK DEFOAMER

SIMPLEX FILTER

TO GOVERNING OIL AND BARRING GEAR OIL

VIEW GLASS

VEF

EOP

AOP-B

S

FILTER

FILTER

TD BFP - MOT

S

AOP-A

COP S

S

LUB OIL CONTROL VALVE LUB OIL CV BYPASS LINE

FILTER

TOP

RECIRCULATION CONTROL VALVE RECIRCULATION CV BYPASS LINE

JOP PRESSURE REGULATING VALVE

LUB OIL HEADER TO BEARINGS

TO RESERVE OIL TANK (COT /DOT)

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

36

TD BFP – LUBRICATING OIL SYSTEM M

BARRING GEAR ROTATING OIL LINE

BOOSTER PUMP

BARRING GEAR

GEAR BOX

TURBINE

LUB OIL HEADER

EMERGENCY OIL TO LUB OIL HEADER

MAIN PUMP

DUMPWELL

COOLER

DRAIN TRIP OIL TO MOT TRIP OIL

COOLER

CONTROL OIL

DEFOAMER

SIMPLEX FILTER

EOP

S FILTER

FILTER

AOP-B

TD BFP-MOT S S

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

TO CONTROL OIL AND BARRING GEAR

AOP-A

S

37

TD BFP – JACKING OIL SYSTEM BOOSTER PUMP

GEAR BOX

TURBINE

MAIN PUMP

THROTTLES

RETURN OIL FROM BEARINGS TO MOT COOLER

COOLER

EOP

LUB OIL HEADER

DEFOAMER

JACKING OIL PRESSURE REGULATOR

JACKING OIL PRESSURE REGULATOR

AOP-B

TD BFP-MOT

JOP AOP-A

S

S

FILTER

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

38

TD BFP – MOT OIL PURIFICATION SYSTEM ECW FOR HEATER BOX

VENT LINE

HEATER BOX ECW OVER FLOW AND DRAIN

FINE FILTER VIEW GLASS

VIEW GLASS

FLOW METER

ECW FOR BOWL SEALING

ANTI FLOOD TANK REGULATOR BOOSTER PUMP RECIRCULATION LINE

CENTRIFUGE MOTOR

CENTRIFUGE

GEAR BOX

S

FEED PUMP “Y” TYPE STRAINER

MOT

VIEW GLASS

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

39

TD BFP MOT COOLER AND FILTER ECW INLET

ECW-28 ECW TO COOLERS ECW FROM TDBFP SEAL AND COOL WATER

ECW OUTLET ECW TO TDBFP SEAL AND COOL WATER ECW TO TDBFP MOT CENTRIFUGE

ECW-29

VENT LINE TDBFP MOT COOLER -TOP

ECW FROM COOLERS

LUB OIL INLET TO COOLER FROM AOP

CV-1

TDBFP MOT COOLER -BOTTOM

VIEW GLASS

CV-2

FOR TD BFP-B

VENT LINE

TDBFP MOT FILTERS

ORIFICE

ECW-28 = ECW 34 ECW-29 = ECW 35

TDBFP MOT

LUB OIL TO TDBFP BEARINGS

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

40

PART -4 PART-4

MAIN MAIN TURBINE TURBINE MOT MOT AND AND CFT CFT OIL OIL

MAIN TURBINE – MOT CONNECTIONS FROM BEARING CHAMBERS OIL VENT FILTERS COOLERS EMERGENCY OIL TO BEARINGS

LUB OIL HEADER TO BEARINGS

S

JACKING OIL LINE

TO ATMOSPHERE OIL SEPARATOR

RETURN OIL FROM BEARINGS

TO DRAIN OIL TANK

MOP /AOP DISCHARGE

FILTERS

FILTERS VENT

LUB OIL DRAIN

COOLERS VENT

AOP-1

AOP-2

EOP

JOP

DCJOP VAPOUR EXTRACTION FANS

CENTRIFUGE OIL PUMP

FROM DOP

JOP PRESSURE REGULATOR MOP SUCTION

SAMPLE LINE

TO RESERVE OIL TANK FROM RESERVE OIL TANK

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

41

MAIN TURBINE – LUBRICATING OIL SYSTEM

MOP INJECTOR

BARRING GEAR VALVE –MAV-51

BARRING GEAR

1

HPT

IPT

2

3

LPT

4

5

GENERATOR

6

EXITER

7

M

SOST TEMPERATURE CONTROL VALVE

RETURN OIL HEADER TO MOT

EOP DISCHARGE ONLY TO BEARINGS

LUB OIL TO BEARINGS

TO ATMOSPHERE

S MOP /AOP DISCHARGE

AOP-1

AOP-2

MOP SUCTION

EOP

JOP

TO DRAIN OIL TANK

FILTERS

DCJOP VEF

INJECTOR

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

COOLERS

42

MAIN TURBINE – JACKING OIL SYSTEM

HPT

IPT

LPT

GENERATOR

EXITER

THROTTLERS

TO DRAIN OIL TANK

FILTERS

PRESSURE REGULATOR

AOP-1

AOP-2

RETURN OIL HEADER FROM BEARINGS

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

EOP

JOP

DCJOP

JACKING OIL RETURNED THROUGH BEARING OIL RETURN LINE

43

MAIN TURBINE – MOT COOLER AND FILTER

ECW OUT

COOLER -B

CENTRIFUGE OIL PUMP

LINE FROM MOP/AOP TO CENTRIFUGE SEALWATER

FROM RESERVE OIL TANK

GAUGE RACK DRAIN

ECW IN

GAUGE RACK DRAIN

MOT FILTERS

COOLER -A

LUB OIL TO BEARINGS

MOT VEF OIL SEPARATOR DRAIN JACKING OIL FILTER DRAIN SOST AND SOST SYPHON DRAIN AOP

AOP-1

EOP

JOP DRAIN OIL PUMP

JOP-1

RETURN OIL FROM BEARINGS

MAIN OIL TANK

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

DOP

DRAIN OIL TANK /CLEAN OIL TANK

CFT ROOM

44

MAIN TURBINE – MOT OIL PURIFICATION SYSTEM ECW LINE

HEATER BOX

ECW TO HEATER BOX

DRAIN TO DIRTY OIL TANK (WASTE FLUID TANK) OR TO PIT

SEAL WATER LINE (ECW)

FLOW METER RETURN OIL HEADER FROM BEARINGS

ANTI FLOOD TANK

PURIFIED OIL CENTRIFUGE TO MOT REGULATOR

MAIN TURBINE

MOT

DRAIN LINE TO DRAIN OIL TANK VIEW GLASS

COP MOTOR

COP GEAR BOX

S FEED PUMP ‘Y’ TYPE STRAINER

SOLONOID VALVE

DRAIN TO DIRTY OIL TANK (WASTE FLUID TANK) OR TO PIT

FROM FILTER,COOLER AND GAUGE RACK DRAINS TO COT /DOT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

45

CENTRAL LUBE OIL STORAGE TANKS CONNECTIONS RETUTN OIL FROM TURBINE BEARINGS

OIL UNLOADING VESSEL VENT FLAME ARRESTER

VENT FLAME ARRESTER

CENTRIFUGE OIL PUMP

COP

FOR BARREL FILLING LINE

LOV-32 LOV-27

LOV-28 LOV-29

LOV-24 LOV-23

LOV-17 LOV-16

LOV-35

LOV-34

LOV-12

LOV-22

LOV-33

DOT

LOV-14

LOV-11

LOV-30

LOV-21

LOV-26

LOV-18

COT

LOV-13

LOV-19

LOV-25

DOP

LOV-01

MOT

LOV-02

MAIN TURBINE

FILTER

LOV-15

LOV-04 LOV-03

TOP

TD MOT-A

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

TOP

TD MOT-B

46

CENTRAL LUBE OIL STORAGE TANKS - CENTRIFUGE SEAL WATER(ECW) ECW LINE ECW TO HEATER BOX

VENT LINE

HEATER BOX ECW OVER FLOW AND DRAIN

SAMPLE LINE

FLOW METER

COT

DOT REGULATOR

TO OIL TANKS FROM OIL TANKS

BOWL

SAMPLE LINE RECIRCULATION LINE ‘Y’ TYPE STRAINER

VIEW GLASS

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

MOTOR

ANTI FLOOD TANK

CENTRIFUGE GEAR BOX

S INEGRAL PUMP

47

CONTROL FLUID TANK AND PUMPS TEMPERATURE CONTROL VALVE AIR LINE FROM SYSTEM

S

ACCUMULATERS

8 BAR CONTROL OIL LINE OIL STIPPER

TO WFT

32 BAR CONTROL OIL LINE

AIR FILTER

PUMP-2

VAPOUR EXTRACTION FANS

COOLER

PUMP-1

COOLER

TO DPT

RETURN OIL LINE FROM SYSTEM

TO ATMOSPHERE

CONTROL FLUID TANK ECW IN ECW OUT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

48

CFT OIL PURIFICATION SYSTEM FROM COOLERS DRAIN

FULLERS EARTH FILTERS

FROM VALVES CONTROL RACK FILTERS DRAIN RETURN OIL FROM SYSTEM

MECHANICAL FILTER

FINE FILTER

FROM ACUMULATOR AND 8 BAR LINE DRAIN A-COOLER VENT(A) B-ACUUMULATOR LINE RELIEF C- 8 BAR DRAIN LINE, AFTER TEMP. CONTROL VALVE D-32 BAR LINE DRAIN E-COOLER VENT(B) F-COOLER OUTLET LINE DRAIN A

B

C

D

E

HEATER

F

SAMPLE LINE

FILTERS DRAIN

CONTROL FLUID TANK

R/C PUMP-1

DPT STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

R/C PUMP-2

DRY PROTECTION TANK

49

CFT COOLER AND DRAINING SYSTEM TEMPERATURE CONTROL VALVE

MOT ROOM FLOOR DRAIN OIL CANAL DRAIN C.F. RACK DRAIN

TO GOVERNING SYSTEMS

OIL STIPPER DRAIN

S

WASTE FLUID TANK / DIRTY OIL TANK 32 BAR CONTROL OIL

RETURN OIL FROM CFT SYSTEMS ECW IN ECW OUT

R/C LINE TO CFT THROUGH FILTERS

CONTROL FLUID TANK

FROM SYSTEM DRAINS FROM EARTH FILTERS DRAIN

DPT CIRCULATING PUMP-1 CIRCULATING PUMP-2

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

50

PART -5 PART-5

GENERATOR GENERATOR AND AND SEAL SEAL OIL OIL SYSTEM SYSTEM

5

6 GENERATOR PRE CHAMBERS

TO MOT

H2 SIDE SEAL OIL

VENT TO ATM THROUGH BCVEF

RING RELIEF OIL

GENERATOR

AIR SIDE SEAL OIL

RING RELIEF OIL

AIR SIDE SEAL OIL

H2 SIDE SEAL OIL

GENERATOR – SEAL OIL SYSTEM

SOST

AIR SIDE SO COOLERS OIL IMPULSE LINE H2 IMPULSE LINE

H2 SIDE EQUALISING VALVES

LLD STATION

DPRV

SOT MAKEUP

DPRV

SOT

FILTERS FILTERS

DPRV

OIL IMPULSE LINE H2 IMPULSE LINE SOT- SEAL OIL TANK SOST- SEAL OIL STORAGE TANK DPRV- DIFFERENTIAL PRE.REG.VALVE

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

H2 SIDE SO COOLERS H2 SIDE SOP

AIR SIDE SOP-1 AIR SIDE SOP-2

DCSOP

ECW OUT ECW IN

51

GENERATOR – GAS FILL AND VENT SYSTEM SAFETY VALVE PRIMARY WATER TANK

GENERATOR

ATMOSPHERE

TO ATMOSPHERE THROUGH BCVE FANS

N2 FILLING LINE

COMPRESED AIR LINE SAMPLE LINE H2 FILLING LINE

GAS PURITY DIGITAL DISPLAY DEVICE

PRESSURE REGULATORS

PRESSURE GAUGE

100.00

ATMOSPHERE

CO2 FILLING LINE

H2 FILL AND VENT BOARD

H2 FILLING RACK

FLASH EVAPORATOR

PRESSURE REGULATORS

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

CO2 FILLING RACK

N2 PRESSURE REGULATOR N2 CYLINDER

52

GENERATOR – H2 DRIER CONNECTIONS PRIMARY WATER TANK TO ATMOSPHERE THROUGH BCVE FANS

GENERATOR

WASTE GAS LINE TO ATMOSPHERE

H2 GAS TO GENERATOR FROM DRIER

H2 GAS TO DRIER OIL TRAP

VIEW GLASS

H2 DRIER TOWER-A

LIMIT SWITCH

H2 DRIER TOWER-B

CHANGEOVER HANDLE BLOWER AIR IN FOR REGENERATION

HEATER BLOWER

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

H2 DRIER TOWER-A IS IN SERVICE AND H2 DRIER TOWER-B IS IN REGENERATION POSITION

53

GENERATOR – PRIMARY WATER SYSTEM EXCESS GAS REMOVE LINE (H2)

PRIMARY WATER TANK

FILTER /MESH

ALKALISER

GENERATOR

MOTOR &PUMP

TO ATMOSPHERE THROUGH BCVE FANS

S

NAOH STORAGE TANK

COOLER

COOLER

ECW OUT

PUMP-A

MAGNETIC FILTERS

STATOR BUSH IN STATOR COOLING WATER INLET N2 CHARGING LINE TO PRIMARY WATER TANK

FINE FILTER

ION EXCHANGER

STATOR BUSH OUT

PUMP-B

ATMOSPHERE

FLOW METER RECIRCULATION LINE

REGULATOR N2 CYLINDER

TEMP.CONTROL VALVE

ECW IN

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

MAKEUP WATER LINE, TAPPING FROM DM MAKEUP WATER PUMPS

54

GENERATOR – BCVE FANS CONNECTIONS PRIMARY WATER TANK

GENERATOR

TO ATMOSPHERE

SOST

OIL SEPARATOR LINE

BCVEF-1 BCVEF-2 DRAIN LINE FROM H2 DRIER OIL TRAP

OIL SEPARATOR LINE DRAIN LINE FROM AIR SIDE SOP SUCTION SYPHON

OIL TANK

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

H2 DRIERS

55

GENERATOR – GAS COOLING WATER SYSTEM AND LLD

COOLER-A

H2 GAS COOLERS

GENERATOR

EXCITER H2 GAS COOLERS

COOLER-B

A B

D C

E

F

G

ECW OUT HEADER ECW IN HEADER

ECW-19

ECW-18

ECW-16

ECW-17

VIEW GLASS TEMPERATURE CONTROL VALVE

ECW IN

ECW IN

ECW OUT

ECW OUT

A,B = T.BOX BOTTOM LEAK

C = T.BOX TOP LEAK

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

D = GENERATOR CENTER LEAK

E,F,G = T.E. LEAKAGE

56

PART -6 PART-6

DOSING DOSING SYSTEMS SYSTEMS AND AND

FIRE FIRE WATER WATER

HYDRAZINE DOSING SYSTEM (N2H4) TO BOILER INITIAL FILL LINE

TO CEP DISCHARGE LINE

CHDV-18

AMMONIA DOSING

DOSING STROKE SETTING AND DISPLAY BOARD PUMP-A

20.0

CHDV-17

CHDV-20

D.M.WATER TAPPING LINE

CHDV-19

CONDENSATE TAPPING LINE

TO BFP SUCTION LINE

CHDV-05 M

CHDV-06 M

PUMP-B

BFP-A S /LINE

20.0

BFP-B S /LINE

CHDV-07 M

HYDRAZINE MEASURING TANK

BFP-C S /LINE

TO AMMONIA DOSING

STIRRER MOTOR DOSING PUMP -1

DOSING PUMP -2

FLUSHING LINE

HYDRAZINE MIXING CUM STORAGE TANK

BREATHER TANK

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

DOSING PUMP MAXIMUM DISCHARGE PRESSURE IS 45 Kg/cm2

57

AMMONIA DOSING SYSTEM (NH3) TO BOILER INITIAL FILL LINE

D.M.WATER TAPPING LINE HYDRAZINE DOSING

DOSING STROKE SETTING AND DISPLAY BOARD PUMP-A

20.0

CHDV-19 CHDV-18

CHDV-20

PUMP-B

CHDV-17

CONDENSATE TAPPING LINE

TO CEP DISCHARGE LINE TO BFP SUCTION LINE

CHDV-11 M

BFP-A S /LINE

CHDV-12 M

20.0

BFP-B S /LINE

CHDV-13 M

TO HYDRAZINE DOSING

BFP-C S /LINE

AMMONIA MEASURING TANK STIRRER MOTOR DOSING PUMP -1

DOSING PUMP -2

FLUSHING LINE

AMMONIA MIXING CUM STORAGE TANK

BREATHER TANK

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

DOSING PUMP MAXIMUM DISCHARGE PRESSURE IS 45 Kg/cm2

58

PHOSPHATE DOSING SYSTEM (PO4) MEASURING TANK STIRRER MOTOR

CONDENSATE TAPPING LINE DM WATER TAPPING LINE

STIRRER MOTOR MIXING TANK

TO BOILER DRUM

DOSING STROKE SETTING AND DISPLAY BOARD PUMP-A

40.0

DOSING PUMP-1

DOSING PUMP-2

PUMP-B

40.0

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

59

SODIUM HYDRAXIDE DOSING SYSTEM (NAOH) STIRRER MOTOR SODIUM HYDRAXIDE MIXING CUM STORAGE TANK BREATHER TANK

D.M. WATER MAKEUP AND FILL LINE TO ECW PUMPS SUCTION LINE

ECW TANK-BOILER

ECW TANKS NORMAL FILLING LINE FROM DM PLANT

ECW TANK-TURBINE

T.G.SIDE

DMV-75 STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

S.G.SIDE

60

FIRE WATER SYSTEM –SPRAY AND HYDRANT

WR-5

UCB

R1WM-2

R1WM-3

R1BF-20 R1WM-11

R1DH-1 R2BF-16

R1BF-9 R1WM-1 WR-4

R1SH-15

R1DH-2

R1BF-7

R1SH- --

DV-90

DV-60

FOPH

DV-61

CHIMNY

R1BF-8

R1WM-4

R1SH-14

R1WM-10

WR-10 R1BF-19

R1BF-6

DV-59

TP-31

WR-3

R1WM-5

BOOSTER PH

ASH SLURRY

R1WM-8 R1BF-18

ESP

WR-7 WR-6

TP-30

R1BF-10

DV-77 DV-69 DV-68

DV-65

WR-14

WR-11

BOILER

DV-72,71,70

DV-89 DV-67

WR-8 WR-9

ESP

WR-13 C/R

R1WM-9

DV-76 DV-66 DV-75 DV-74

R1BF-11

R1BF-13 R1BF-12

R1SH-7

R1BF-5

R1SH-5

R1BF-4

DG

R1SH-6

DV-85

TURBINE

WR-2

DV-84

R1SH-4

ST-TR

R1SH-8

PH

R1SH-13

DV- --

R1SH-17

WR-1

DV-81,82,83

R1SH-3

GT-B

R1SH-10 R1WM-7 R1BF-14

TP-28

R1BF-21

DV-79

DV-55 VACUUM R1WM-6 DV-62,56,57,58

DV-43

R2SH-3

PH

GT-Y

ACW PH

R1SH-9

SER-WATER

GT-R

SPRAY LINE

R1BF-16

R1SH-11

DV-44

DV-45

R1SH-16

R1BF-2

R1BF-3

R1SH-2

UAT-1 UAT-2

DV-47,46

DV-54

R1SH-18

DV-80

R1SH-12

R2BF-5

R2WM-2 R2BF-4

R2BF-3

TP-29

R1BF-1

RING-1 HYDRANT LINE

TO CHP R2WM-1

DV-51 , 50 , 49 , 48 R1BF-17

WR-12

PH

ASH WATER

DV-53

DV-52

FMSH-2

RING-3 HYDRANT LINE RING-2 HYDRANT LINE SPRAY LINE R2SH-1 R2SH-2 R2BF-2

FIRE WATER

R1BF-15

R1SH-1

LDO

R2BF-1

FWT-1

LDO UNLOAD PH FOAM PH DV-64

FWT-2

PUMP HOUSE

R3BF-5

R3SH-16

R3SH-15

R3BF-1

FMSH-1

WR = WET RAISER DV = DELUGE VALVE WM = WATER MONITER FM = FOAM FWT= FIRE WATER TANK

DV-63

R3BF-3

R3SH-7 R3BF-2

CPU REGEN UNIT

R3SH-9

R3SH-10

R3SH-11

R3SH-12

R3BF-6

R3SH-1

T-7A

CL.BLDG

R3BF-4

ID C

R3SH-8

CW PH

ASH WATER RECIRCULATION FACILITIES

R3SH-5

R3SH-14

R3SH-2

R3SH-4

YARD

SH = SINGLE HYDRANT DH = DOUBLE HYDRANT BF = BUTTER FLY VALVE PH = PUMP HOUSE FEH = FIRE ESCAPE HYDRANT

FMSH-3

R3SH-3

R3SH-13

INTER CONNECTION LINE (STAGE-2)

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

61

FIRE WATER SYSTEM – D.V AND WR NUMBERS DV NO

SYS

DV-43

MVWS

A

EQUIPMENT /AREA PROTECTED

DV NO

SYS

DV-75

HVWS

C

DV-44

MVWS

A

DV-45

MVWS

A

CONV.31 A/B

DV-76

HVWS

C

SEAL OIL OIL UNIT AT EL(+) 0.00 M

CONV.31 A/B

DV-77

HVWS

C

TURBINE LUB OIL UNIT AT EL(+) 8.50 M

DV-46

MVWS

A

CONV.31 A/B

DV-78

DV-47

MVWS

A

CONV.31 A/B

DV-79

HVWS

C

TURBINE LUB OIL CANAL PIPING AT EL(+) 17.00 M

DV-48

MVWS

A

DV-49

MVWS

A

CONV.31 A/B

DV-80

HVWS

C

UNIT AUX.TRANSFORMER A / B

CONV.31 A/B

DV-81

HVWS

C

GENERATOR TRANSFORMER - R

DV-50

MVWS

A

CONV.31 A/B

DV-51

MVWS

A

CONV.31 A/B

DV-82

HVWS

C

GENERATOR TRANSFORMER - Y

DV-83

HVWS

C

GENERATOR TRANSFORMER - B

CONV.31 A/B

EQUIPMENT /AREA PROTECTED CENTRAL LUB OIL UNIT AT EL(+) 0.00 M

DV-52

MVWS

A

CONV.31 A/B

DV-84

HVWS

C

STATION TRANSFORMER

DV-53

MVWS

A

TP-29-(EL) (+) 57.00M

DV-85

MVWS

A

DIESEL TANK AT D.G.ROOM

DV-54

MVWS

A

TP-29-(EL) (+) 65.00M

DV-86

-

-

DV-55

MVWS

A

CONV.32 A/B

DV-87

-

DV-56

MVWS

A

CONV.32 A/B

DV-88

-

-

T.G-EL(+) 9.5M, 18M

DV-57

MVWS

A

TP-30-EL(+)65.50M,67.00M

DV-89

MVWS

B

5.1 M CABLE GALLERY MAIN PLANT

DV-58

MVWS

A

CONV.33 A/B

DV-90

HVWS

C

FUEL OIL PUMP HOUSE

DV-59

MVWS

A

CONV.33 A/B

-

-

-

ESP CONTROL ROOM WET RAISERS

DV-60

MVWS

A

TP-31-EL(+)59.00M

DV-61

MVWS

A

TP-31-EL(+)53.50M BUNKER 34 B

DV-62

MVWS

A

TP-31-EL(+)53.50M BUNKER 34 A

FEH01 EL(+) 9.5M

FEH10 EL(+) 5.25M

DV-63

MVWS

A

LDO TANK

FEH02 EL(+) 18M

FEH11 EL(+) 9.5M

FEH23 EL(+) 56.75M FEH34 EL(+) 56.75M FEH46EL(+) 9.40M

DV-64

MVWS

A

LDO UNLOAD PUMP HOUSE

FEH12 EL(+) 14.5M

FEH24 EL(+) 62.50M FEH35 EL(+) 62.50M FEH47 EL(+) 12.20M

DV-65

MVWS

B

ESP CONTROL ROOM

FEH03 EL(+) 9.5M

FEH13 EL(+) 18M

FEH25 EL(+) 69.05M FEH36 EL(+) 69.05M FEH48 EL(+) 17.70M

DV-66

MVWS

B

EL(+)24.00 M IN B-C BAY (MCC CABLE GALLERY)

FEH04 EL(+) 18M

DV-67

MVWS

B

EL(+)13.50 M IN C-E BAY ( CABLE.GALLERY )

WR-1 (TG)

WR-4 (UCB)

WR-2 (TG)

WR-3(TG)

WR-5 (TG) FEH14 EL(+) 9.5M

WR-7(BLR)

WR-9 (BLR)

FEH26 EL(+) 75.55M FEH37 EL(+) 75.55M WR-8 BLR)

WR-10 (TP-31)

DV-68

MVWS

B

EL(+)08.50 M IN A-B BAY ( CABLE GALLERY )

FEH05 EL(+) 6.10M

DV-69

MVWS

B

EL(+)00.00 M IN A-B BAY ( CABLE GALLERY )

FEH06 EL(+) 14.50M

DV-70

HVWS

C

BOILER BURNER FRONT EL(+) 24.00 M

FEH07 EL(+) 25.00M FEH16 EL(+) 10.00M FEH29 EL(+) 26.00M

FEH08 EL(+) 32.75M FEH17 EL(+) 19.00M FEH30 EL(+) 30.00M FEH40 EL(+) 54.50M

DV-71

HVWS

C

FRONT SIDE OF BOILER BURNER FRONT AT EL (+) 27.25 M, EL(+) 30.40 M, EL(+) 33.60 M, 36.70 M

DV-72

HVWS

C

FRONT SIDE OF BOILER BURNER FRONT AT EL (+) 27.25 M, EL(+) 30.40 M, EL(+) 33.60 M, 36.70 M

DV-73 DV-74

HVWS

C

BFP LUB OIL CONSOLE AT EL(+) 0.00 M

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

FEH15 EL(+) 18M WR-6 (BLR)

WR-13 (ESP C/R)

FEH22 EL(+) 50.50M FEH33 EL(+) 50.50M FEH45 EL(+) 4.70M

WR-14 (ESP C/R) FEH49 EL(+) 4.70M

FEH27 EL(+) 10.00M FEH38 EL(+) 54.50M FEH50EL(+) 9.40M FEH28 EL(+) 19.00M FEH39 EL(+) 60.50M FEH51 EL(+) 12.20M WR-11 (TP-30)

FEH52 EL(+) 17.70M

FEH09 EL(+) 37.00M FEH18 EL(+) 26.00M FEH31 EL(+) 37.80M FEH41 EL(+) 60.50M FEH19 EL(+) 33.00M FEH32 EL(+) 44.30M FEH42 EL(+) 68.00M FEH20 EL(+) 37.80M

WR-12 (TP-29)

FEH21 EL(+)44.30M

FEH43 EL(+) 57.50M

FEH = FIRE ESCAPE HYDRANT

FEH44 EL(+) 66.20M

62

FIRE WATER PUMP HOUSE (STAGE-3) SPRAY LINE TO TURBINE AND BOILER

FIRE WATER TANK FILL LINE

FIRE WATER TANK - 2

STRAINERS

FIRE WATER PUMPS DISCHARGE HEADER R/C LINE

SPRAY LINE TO CHP

M

M

HPT

FIRE WATER PUMPS SUCTION HEADER

FIRE WATER CONTROL ROOM

PS

SPRAY PUMP-1

SPRAY DIESEL HYDRAUNT PUMP-1 DIESEL PUMP-1

HYDRAUNT PUMP-1

HYDRAUNT PUMP-2

JACKY HYDRAUNT PUMP-1 PUMP-3

HYDRANT LINE TO RING -3

FIRE WATER TANK - 1

HYDRANT LINE TO RING -2

HYDRANT LINE RING -1

PS

COMPRESSOR-2 JACKY PUMP-2 COMPRESSOR-1

FIRE WATER PUMP HOUSE STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

63

NOTES PAGE

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

64

THANKYOU THANKYOU

FOR FOR USING USING AND AND CHOOSING CHOOSING

V.BAL RAJESHAM V.BAL RAJESHAM STAGE-3 TURBINE OPERATOR STAGE-3 TURBINE OPERATOR

[email protected]

STAGE-3 TURBINE SCHEMES – BOOK OF “ LINE TRACE ”

!"

(A Government of India Enterprise)

Ramagundam Super Thermal Power Station P.O.Jyothinagar,Dist.Karimnagar-505215 (A.P)

Related Documents

Stage 2 Scheme
February 2021 1
Governing Scheme Write-up
February 2021 1
Stage Hypnosis
February 2021 1
9618 Scheme Of Work
March 2021 0

More Documents from "Reda El Katiab"

Stage 2 Scheme
February 2021 1