VALORIZACION FINAL DE OBRA Municipalidad Provincial de Candarave PROYECTO

: "CONSTRUCCION DE RESERVORIO PATAPATANI"

VALORIZACION FINAL DE OBRA

: S/.263,695.90

PRESUPUESTO BASE

: JUNIO DEL 2,009

FECHA DE PRESENTACION

PLAZO DE EJEC. REAL

: 3 MESES CALENDARIOS

SUPERVISOR DE OBRA

: ING. ALONSO JOSE AGÜERO TAIPE

MODALIDAD

: ADMINISTRACION DIRECTA.

RESIDENTE DE OBRA

:ING. AGAPITO FLORES JUSTO

AVANCES

PRESUPUESTO

DESCRIPCION

PARTIDA

ANTERIOR

P.UNT. UND

METRADO

PRESUP.

S/.

01.00.00

TRABAJOS PRELIMINARES

01.01.00

ALMACEN

M2

01.02.00

CARTEL DE OBRA

UND

02.00.00

TRABAJOS PRELIMINARES

02.01.01

DESBROCE Y LIMPIEZA

M2

906.00

0.30

271.80

02.02.01

TRAZO NIVELACION Y REPLANTEO DE RESERVORIO

M2

836.00

5.97

4,990.92

03.00.00

MOVIMIENTO DE TIERRAS

03.01.00

EXCAVACION MATERIAL SUELTO - RESERVORIO

M3

2,471.13

5.65

03.02.00

EVACUACION DE MATERIAL EXCEDENTE - RESERVORIO

M3

2,537.13

2.64

03.03.00

EXCAVACION MATERIAL SUELTO - OBRAS CONEXAS

M3

150.00

03.04.00

REFINE PERFILADO - CAJA RESERVORIO

M2

03.05.00

RELLENO Y COMPACTACION MANUAL

03.06.00

CAMA DE PIEDRA COLOCADA - PISO DE RESERVORIO

04.00.00

OBRAS DE CONCRETO RESERVORIO

04.01.00

CONCRETO CICLOPEO F'C=210 KG/CM2 + 30% P.G.

M3

305.30

283.74

04.02.00

ENCOFRADO Y DESENCOFRADO DE MUROS CARAVISTA

M2

550.00

36.91

04.03.00

CONCRETO CICLOPEO F'C=210 KG/CM2 PISO RESERVORIO

M3

130.70

04.04.00

ACERO DE REFUERZO FY=4200 KG/CM2

KG

04.05.00

JUNTAS DE DILATACION

M

04.06.00

SOLADO DE CONCRETO 1:8 + 25% P.G.

M3

05.00.00

OBRAS CONEXAS

05.01.00

CONCRETO CICLOPEO F'C=210 KG/CM2 + 30% P.G.

M3

15.00

05.02.00

ENCOFRADO Y DESENCOFRADO DE MUROS CARAVISTA

M2

85.00

05.03.00

ACERO DE REFUERZO FY=4200 KG/CM2

KG

95.00

05.04.00

SISTEMA DE DESCARGA

UND

ACTUAL

VALORIZADO METRADO METRADO S/.

ACUMULADO

VALORIZADO S/.

METRADO

SALDO

VALORIZADO S/.

%

METRADO

VALORIZADO S/.

%

2,267.18 20.00

91.95

1,839.00

20.00

1839.00

20.00

1839.00

100.00

0.00

0.00

0.00

1.00

428.18

428.18

1.00

428.18

1.00

428.18

100.00

0.00

0.00

0.00

906.00

271.80

906.00

271.80

100.00

0.00

0.00

0.00

836.00

4990.92

836.00

4990.92

100.00

0.00

0.00

0.00

13,961.88

2471.13

13961.88

2471.13

13961.88

100.00

0.00

0.00

0.00

6,698.02

2537.13

6698.02

2537.13

6698.02

100.00

0.00

0.00

0.00

5.65

847.50

150.00

847.50

150.00

847.50

100.00

0.00

0.00

0.00

275.00

1.83

503.25

275.00

503.25

275.00

503.25

100.00

0.00

0.00

0.00

M3

334.40

5.23

1,748.91

334.40

1748.91

334.40

1748.91

100.00

0.00

0.00

0.00

M3

145.20

43.23

6,277.00

145.20

6277.00

145.20

6277.00

100.00

0.00

0.00

0.00

86,625.82

305.30

86625.82

305.30

86625.82

100.00

0.00

0.00

0.00

20,300.50

550.00

20300.50

550.00

20300.50

100.00

0.00

0.00

0.00

328.24

42,900.97

130.70

42900.97

130.70

42900.97

100.00

0.00

0.00

0.00

2,440.00

2.83

6,905.20

2440.00

6905.20

2440.00

6905.20

100.00

0.00

0.00

0.00

382.80

36.66

14,033.45

382.80

14033.45

382.80

14033.45

100.00

0.00

0.00

0.00

2.00

215.97

431.94

2.00

431.94

2.00

431.94

100.00

0.00

0.00

0.00

5,262.72

30,036.57

171,197.90

20,536.44

2.00

283.74

4,256.10

15.00

4256.10

15.00

4256.10

100.00

0.00

0.00

0.00

36.91

3,137.35

85.00

3137.35

85.00

3137.35

100.00

0.00

0.00

0.00

2.83

268.85

95.00

268.85

95.00

268.85

100.00

0.00

0.00

0.00

6,041.38

12,082.76

2.00

12082.76

2.00

12082.76

100.00

0.00

0.00

0.00

VALORIZACION FINAL DE OBRA Municipalidad Provincial de Candarave PROYECTO PRESUPUESTO BASE

: "CONSTRUCCION DE RESERVORIO PATAPATANI"

VALORIZACION FINAL DE OBRA

: S/.263,695.90

: JUNIO DEL 2,009

FECHA DE PRESENTACION

PLAZO DE EJEC. REAL

: 3 MESES CALENDARIOS

SUPERVISOR DE OBRA

: ING. ALONSO JOSE AGÜERO TAIPE

MODALIDAD

: ADMINISTRACION DIRECTA.

RESIDENTE DE OBRA

:ING. AGAPITO FLORES JUSTO

AVANCES

PRESUPUESTO PARTIDA

05.05.00

DESCRIPCION COMPUERTA TIPO TARJETA

ANTERIOR

P.UNT. UND

UND

METRADO

1.00

S/.

PRESUP.

ACTUAL

VALORIZADO METRADO METRADO S/.

791.38

791.38

COSTO DIRECTO DE LA OBRA S/. GASTOS GENERALES (15%)

229,300.78 34,395.12

0.00 0.00

TOTAL PRESUPUESTO

263,695.90

0.00

AVANCE FISICO MENSUAL

100.00

ACUMULADO

VALORIZADO S/.

1.00

791.38

95.65

METRADO

1.00

SALDO

VALORIZADO S/.

%

791.38

100.00

229,300.78 22,930.08

229,300.78 34,395.12

100.00

252,230.87

263,695.90

METRADO

0.00

VALORIZADO S/.

%

0.00

0.00

0.00 0.00

0.00 0.00

0.00

Related Documents

Valorizacion De Obra 01
January 2021 2
Valorizacion Final
January 2021 2
Valorizacion Mayo
January 2021 2
Inf-termino De Obra
February 2021 1

More Documents from "ingcivilcuscounsaac"