MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011

02.00.00 OBRAS PRELIMINARES 02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

Partida Especifica :

02.02.00 DEMOLICION MANUAL DE LOSA DE CONCRETO

DESCRIPCION DEMOLICION MANUAL DE LOSA DE CONCRETO Fecha :

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

TOTAL METRADO : Partida Especifica :

4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

ESTIMADO PARCIAL m2 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00

02.03.00 DEMOLICION DE MUROS DE CONTENCION EXISTENTE DESCRIPCION

DEMOLICION DE MUROS DE CONTENCION EXISTENTE Fecha :

DIST/LONG (ML) 6.10 6.10 6.10 6.10 6.10 6.10 6.10

DIMENSIONES ALTURA ANCHO (ML) (ML) 1.10 0.75 0.60 0.55 0.60 0.60 0.40

0.35 0.35 0.35 0.35 0.35 0.50 0.50

2.35 1.60 1.28 1.17 1.28 1.83 1.22

TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

6.40

640.00

30.00 45.00 40.00 25.00 50.00 65.00 45.00 55.00 40.00 30.00 68.00 42.00 62.00 43.00

N° VECES 1.00 1.00 1.00 1.00 1.00 1.00 1.00

TOTAL m3 2.35 1.60 1.28 1.17 1.28 1.83 1.22

TOTAL METRADO m2 30.00 45.00 40.00 25.00 50.00 65.00 45.00 55.00 40.00 30.00 68.00 42.00 62.00 43.00

TOTAL METRADO m3 2.35 1.60 1.28 1.17 1.28 1.83 1.22

10.74

02.04.00 TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA DESCRIPCION

1.50 2.25 2.00 1.25 2.50 3.25 2.25 2.75 2.00 1.50 3.40 2.10 3.10 2.15

ESTIMADO PARCIAL m3

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL m2

2.60

ESTIMADO PARCIAL m2 16.64

N° VECES 1.00

TOTAL m2 16.64

TOTAL METRADO m2 16.64

16.64

TOTAL METRADO :

04.00.00 LOSA DEPORTIVA 04.01.00

MOVIMIENTOS DE TIERRAS

Partida Especifica :

002.01.01 #N/A

DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL #N/A 0.00

002.02

#N/A

002.02.01 #N/A DESCRIPCION

DIST/LONG

DIMENSIONES ALTURA ANCHO

1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

ESTIMADO PARCIAL

N° VECES

TOTAL

TOTAL METRADO

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

SUSTENTACION DESCRIPCION

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

DE METRADOS (ML)

#N/A

(ML)

(ML)

MES DE MAYO 2011 N° VECES #N/A

(Ver hoja de metrados de movimiento de tierras)

1.00

002.02.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

ESTIMADO PARCIAL #N/A

(Ver hoja de metrados de movimiento de tierras)

002.02.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

DESCRIPCION

#N/A

DIST/LONG (ML)

DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

003.01

TOTAL METRADO #N/A 0.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

#N/A #N/A

Partida Especifica :

003.01.01 #N/A DESCRIPCION

#N/A

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO :

003

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES 1.00

TOTAL METRADO : 002.02.06 #N/A

TOTAL #N/A

ESTIMADO PARCIAL #N/A

(Ver hoja de metrados de movimiento de tierras)

Partida Especifica :

0.00

TOTAL METRADO #N/A

0.00

TOTAL METRADO : 002.02.05 #N/A

N° VECES 1.00

(Ver hoja de metrados de movimiento de tierras)

Partida Especifica :

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : 002.02.04 #N/A

0.00

0.00

(Ver hoja de metrados de movimiento de tierras)

Partida Especifica :

N° VECES 1.00

TOTAL METRADO : Partida Especifica :

0.00

#N/A

0.00

TOTAL METRADO : Partida Especifica :

#N/A

DIST/LONG (ML) 0.00 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 6.00 6.00

ESTIMADO PARCIAL #N/A 0.00 0.00

N° VECES 1.00 1.00

TOTAL #N/A 0.00 0.00

TOTAL METRADO #N/A 0.00 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011 0.00

TOTAL METRADO : Partida Especifica :

003.01.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL #N/A 0.00

003.01.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

003.01.04 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

003.02

#N/A

003.02.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00 0.00 0.00 0.00

8.10

0.00

003.02.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

6.00 1.20 1.00 9.00

0.00 0.00 0.00 0.00

003.02.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

TOTAL METRADO :

0.00

1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00 1.00 1.00 1.00

TOTAL #N/A 0.00 0.00 0.00 0.00

TOTAL METRADO #N/A 0.00 0.00 0.00 0.00

0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.50 8.00 1.00 0.60

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL METRADO #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL #N/A

0.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

0.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS Partida Especifica :

MES DE MAYO 2011

003.02.04 #N/A DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

ESTIMADO PARCIAL #N/A

N° VECES

TOTAL #N/A

TOTAL METRADO #N/A

#N/A Fecha : 2.00

1.50

3.00

003.03

#N/A

003.03.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

003.03.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

003.03.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

003.03.04 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

003.04

#N/A

003.04.01 #N/A DESCRIPCION

DIST/LONG (ML)

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

#N/A

0.00

1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

TOTAL METRADO :

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00

N° VECES 1.00

0.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS Partida Especifica :

MES DE MAYO 2011

003.04.02 #N/A DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

#N/A

ESTIMADO PARCIAL #N/A 0.00

003.04.03 #N/A DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

#N/A

004.01

0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

#N/A #N/A

Partida Especifica :

004.01.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL #N/A 0.00

Partida Especifica :

004.01.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

004.01.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

#N/A

004.02.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

TOTAL METRADO : Partida Especifica :

004.02.02 #N/A DESCRIPCION

DIMENSIONES

0.00

1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 1.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

1.00

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

N° VECES

0.00

TOTAL METRADO :

004.02

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO :

004

1.00

TOTAL #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

6.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00 ESTIMADO

TOTAL METRADO

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS DESCRIPCION

MES DE MAYO 2011

DIST/LONG (ML)

#N/A

0.00

ALTURA (ML) 0.00

ANCHO (ML) 0.00

PARCIAL #N/A 0.00

004.02.03 #N/A DESCRIPCION

DIST/LONG (ML)

#N/A

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00 0.00

004.02.04 #N/A DESCRIPCION

DIST/LONG (ML)

#N/A

0.00 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

DESCRIPCION

DIST/LONG (ML)

N° VECES 1.00 1.00

TOTAL #N/A 0.00 0.00

ESTIMADO PARCIAL #N/A 0.00

0.00

TOTAL METRADO #N/A 0.00 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

TOTAL METRADO : 004.02.05 #N/A

TOTAL METRADO #N/A

0.00

0.00

Partida Especifica :

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

DIMENSIONES ALTURA ANCHO (ML) (ML)

ESTIMADO PARCIAL #N/A

N° VECES

TOTAL #N/A

TOTAL METRADO #N/A

#N/A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

004.02.06 #N/A DESCRIPCION

#N/A Fecha : 8/2/2010 8/3/2010 8/5/2010 8/6/2010

0+500 0+412 0+000 0+120

a a a a

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0+412 0+304 0+120 0+180

ESTIMADO PARCIAL #N/A

0.00 0.00 0.00 0.00

004.02.07 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

N° VECES

1.00 1.00 1.00 1.00

TOTAL #N/A

0.00 0.00 0.00 0.00

TOTAL METRADO #N/A

0.00 0.00 0.00 0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL METRADO : Partida Especifica :

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

0.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011 0.00

TOTAL METRADO : 004.03

#N/A

004.03.01 #N/A

Partida Especifica :

DESCRIPCION

DIST/LONG (ML)

#N/A

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL #N/A 0.00

004.03.02 #N/A DESCRIPCION

#N/A Fecha :

Prog 0+000 0+120

a a

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0+120 0+180

0.00 0.00

004.03.03 #N/A DESCRIPCION

#N/A Fecha : 8/2/2010

0+000

a

DIST/LONG (ML)

0+000

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

004.03.04 #N/A DESCRIPCION

Fecha : 8/2/2010 8/3/2010

0+500 0+412

a a

DIST/LONG (ML) 0+412 0+304

DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

004.03.06 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

Partida Especifica :

004.03.07 #N/A DESCRIPCION

DIMENSIONES

0.00 0.00

1.00

TOTAL #N/A

0.00

TOTAL METRADO #N/A

0.00

N° VECES 1.00 1.00

TOTAL #N/A 0.00 0.00

TOTAL METRADO #N/A 0.00 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00 ESTIMADO PARCIAL #N/A 0.00

TOTAL METRADO :

N° VECES

ESTIMADO PARCIAL #N/A 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

TOTAL METRADO #N/A

0.00

TOTAL METRADO : Partida Especifica :

0.00 0.00

ESTIMADO PARCIAL #N/A 0.00 0.00

004.03.05 #N/A

1.00 1.00

TOTAL #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

ESTIMADO PARCIAL #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL METRADO #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL #N/A

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00 ESTIMADO

TOTAL METRADO

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS DESCRIPCION

#N/A

MES DE MAYO 2011

DIST/LONG (ML)

ALTURA (ML)

ANCHO (ML)

0.00

PARCIAL #N/A 0.00

004.03.08 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

004.03.09 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

004.04

#N/A

004.04.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

004.04.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

005.01

0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00 ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

TOTAL METRADO :

005

1.00

TOTAL #N/A

ESTIMADO PARCIAL #N/A 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

ESTIMADO PARCIAL #N/A 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

TOTAL METRADO #N/A

0.00

TOTAL METRADO : Partida Especifica :

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

#N/A #N/A

Partida Especifica :

005.01.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL #N/A 0.00

005.01.02 #N/A DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

ESTIMADO PARCIAL #N/A

N° VECES

TOTAL #N/A

TOTAL METRADO #N/A

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS #N/A

MES DE MAYO 2011 0.00

0.00

0.00

005.02

#N/A

005.02.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

005.02.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

005.02.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

005.02.04 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

005.03

#N/A

005.03.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

005.03.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

Ver hoja de metrados de acero

TOTAL METRADO :

1.00

TOTAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

ESTIMADO PARCIAL #N/A 0.00

TOTAL METRADO #N/A 0.00

TOTAL METRADO #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

1.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

0.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS Partida Especifica :

MES DE MAYO 2011

005.03.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

005.03.04 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

005.04

#N/A

005.04.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

005.05

#N/A

005.05.01 #N/A DESCRIPCION

DIST/LONG (ML)

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

#N/A

006.01

N° VECES 1.00

TOTAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

ESTIMADO PARCIAL #N/A 0.00

0.00

TOTAL METRADO #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

TOTAL METRADO :

006

0.00

TOTAL METRADO #N/A

0.00

TOTAL METRADO :

DESCRIPCION

1.00

ESTIMADO PARCIAL #N/A 0.00

005.05.02 #N/A

0.00

0.00

#N/A

Partida Especifica :

N° VECES

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

#N/A #N/A

Partida Especifica :

006.01.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

TOTAL METRADO : Partida Especifica :

006.01.02 #N/A

0.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

0.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS DESCRIPCION

#N/A

MES DE MAYO 2011

DIMENSIONES DIST/LONG ALTURA ANCHO (ML) (ML) (ML) 0.00

3.80

ESTIMADO PARCIAL #N/A 0.00

006.01.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

006.02

#N/A

006.02.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

006.02.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

006.02.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

006.02.04 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

006.02.05 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

1.00

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

1.00

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

0.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011 0.00

TOTAL METRADO : Partida Especifica :

006.02.06 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

006.03

#N/A

006.03.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

006.04

#N/A

006.04.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

006.04.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

Ver hoja de metrados de acero

006.04.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

006.04.04 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

TOTAL METRADO :

0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

TOTAL METRADO #N/A

0.00

TOTAL METRADO : Partida Especifica :

0.00

ESTIMADO PARCIAL #N/A 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

1.00

TOTAL #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL METRADO #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL #N/A

0.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

0.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS Partida Especifica :

MES DE MAYO 2011

006.04.05 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

Ver hoja de metrados de acero

ESTIMADO PARCIAL #N/A 0.00

006.04.06 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

006.04.07 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

006.05

#N/A

006.05.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

006.05.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

006.06

#N/A

006.06.01 #N/A DESCRIPCION

DIST/LONG (ML)

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

#N/A

0.00

DESCRIPCION

DIST/LONG

1.00

0.00

N° VECES 1.00

TOTAL #N/A 0.00

DIMENSIONES ALTURA ANCHO

N° VECES 1.00

TOTAL #N/A 0.00

ESTIMADO PARCIAL #N/A 0.00

006.06.02 #N/A

0.00

TOTAL METRADO #N/A 0.00

TOTAL METRADO #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

1.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

ESTIMADO PARCIAL

N° VECES

TOTAL

TOTAL METRADO

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

SUSTENTACION DESCRIPCION

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

DE METRADOS (ML)

(ML)

(ML)

#N/A

MES DE MAYO 2011 N° VECES #N/A

0.00

006.07

#N/A

006.07.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL #N/A 0.00

006.07.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

006.08

#N/A

006.08.01 #N/A DESCRIPCION

DIST/LONG (ML)

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

#N/A

007.01

0.00

0.00

1.00

0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

#N/A #N/A

Partida Especifica :

007.01.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

#N/A

Partida Especifica :

007.02.01 #N/A DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

TOTAL METRADO : 007.02

N° VECES

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO :

007

TOTAL METRADO #N/A

0.00

TOTAL METRADO :

DESCRIPCION

0.00

ESTIMADO PARCIAL #N/A 0.00

006.08.02 #N/A

1.00

TOTAL #N/A

0.00

#N/A

Partida Especifica :

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00

#N/A

0.00

TOTAL METRADO : Partida Especifica :

1.00

#N/A

ESTIMADO PARCIAL #N/A

N° VECES

TOTAL #N/A

TOTAL METRADO #N/A

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS #N/A

MES DE MAYO 2011 0.00

0.00

0.00

0.00

007.02.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

007.02.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

007.03

#N/A

007.03.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

007.03.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

007.03.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

007.04

#N/A

007.04.01 #N/A DESCRIPCION

#N/A Fecha :

DIST/LONG (ML)

0.00

0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00 0.00 0.00

1.00

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

1.00

1.22 1.22 1.22

ESTIMADO PARCIAL #N/A 0.00 0.00 0.00

N° VECES 0.00 0.00 0.00

TOTAL #N/A 0.00 0.00 0.00

TOTAL METRADO #N/A 0.00 0.00 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011 0.00

TOTAL METRADO : Partida Especifica :

007.04.02 #N/A DESCRIPCION

DIST/LONG (ML)

DIMENSIONES Diametro CANTIDAD (") (UND)

ESTIMADO PARCIAL #N/A

N° VECES

TOTAL #N/A

TOTAL METRADO #N/A

#N/A Fecha : 3/8 1/2 3/8 1/2 3/8 1/2 1/2 1/2 1/2 5/8 5/8

9.00 4.00 270.00 76.00 85.00 32.00 104.00 48.00 56.00 18.00 8.00

5.22 4.08 156.60 77.52 49.30 32.64 106.08 48.96 57.12 28.80 12.80

007.04.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

007.04.04 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

007.05

#N/A

007.05.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

007.06

#N/A

007.06.01 #N/A DESCRIPCION

DIST/LONG (ML)

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

#N/A

0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

ESTIMADO PARCIAL #N/A 0.00

TOTAL METRADO :

0.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

1.00

TOTAL #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

N° VECES 1.00

0.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS Partida Especifica :

MES DE MAYO 2011

007.06.02 #N/A DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

#N/A

ESTIMADO PARCIAL #N/A 0.00

008.01

#N/A

008.01.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 1.00

1.00

ESTIMADO PARCIAL #N/A 0.00

0.00

Partida Especifica :

008.01.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

#N/A

008.02.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00 0.00 0.00

0.00

0.00

008.02.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

1.00 1.00 1.00

0.00 0.00 0.00

008.02.03 #N/A DESCRIPCION

DIST/LONG (ML) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00 1.00 1.00

TOTAL #N/A 0.00 0.00 0.00

TOTAL METRADO #N/A 0.00 0.00 0.00

0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 1.20 2.20 1.00 0.60 2.10 2.50 1.20 0.50

1.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

N° VECES

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 1.00 1.00 1.00

1.00

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

N° VECES

0.00

TOTAL METRADO :

#N/A

0.00

#N/A

Partida Especifica :

008.02

1.00

TOTAL METRADO #N/A

0.00

TOTAL METRADO :

008

N° VECES

TOTAL #N/A

0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60

ESTIMADO PARCIAL #N/A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

N° VECES 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

TOTAL #N/A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

TOTAL METRADO #N/A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011 0.00

1.40

0.60

0.00

009.01

#N/A

009.01.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

1.00

ESTIMADO PARCIAL #N/A 0.00

#N/A

Partida Especifica :

009.02.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 1.50

009.02.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

2.00

0.00

009.02.03 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

#N/A

009.03.01 #N/A DESCRIPCION

#N/A

DIST/LONG (ML)

0.00

0.00

009.03.02 #N/A DESCRIPCION

#N/A

DIST/LONG (ML) 0.00

0.00

0.00

1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

N° VECES

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

1.00

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

N° VECES

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

0.00

TOTAL METRADO #N/A

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

1.00

TOTAL #N/A

ESTIMADO PARCIAL #N/A

TOTAL METRADO : Partida Especifica :

N° VECES

0.00

TOTAL METRADO :

009.03

0.00

#N/A

Partida Especifica :

009.02

0.00

0.00

TOTAL METRADO :

009

1.00

0.00

ESTIMADO PARCIAL #N/A 0.00

N° VECES 1.00

TOTAL #N/A 0.00

TOTAL METRADO #N/A 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011 0.00

TOTAL METRADO :

010

010.01

IMPLEMENTOS DE SEGURIDAD IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.01.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL est. 0.00

0.00

0.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.02.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL est. 0.00

Partida Especifica :

010.02.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

010.02.03 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

0.00

TOTAL METRADO est. 0.00

0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

1.00

TOTAL est.

ESTIMADO PARCIAL est.

TOTAL METRADO : Partida Especifica :

N° VECES

0.00

TOTAL METRADO :

0.00

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : 010.03

1.00

TOTAL METRADO est.

0.00

TOTAL METRADO : 010.02

N° VECES

TOTAL est.

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.03.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO PARCIAL est. 0.00

010.03.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

IMPLEMENTOS DE SEGURIDAD

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

TOTAL METRADO :

1.00

0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL est.

0.00

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

0.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS Partida Especifica :

MES DE MAYO 2011

010.03.03 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

0.00

ESTIMADO PARCIAL est. 0.00

0.00

0.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.04.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL est. 0.00

Partida Especifica :

010.04.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

010.04.03 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

1.00

0.00

ESTIMADO PARCIAL est.

TOTAL METRADO est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL est.

0.00

TOTAL METRADO :

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : 010.05

1.00

TOTAL METRADO est.

0.00

TOTAL METRADO : 010.04

N° VECES

TOTAL est.

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.05.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL est. 0.00

010.05.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

010.05.03 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL est.

0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : Partida Especifica :

1.00

TOTAL METRADO est.

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL est.

ESTIMADO PARCIAL est.

N° VECES

TOTAL est.

TOTAL METRADO est.

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011

IMPLEMENTOS DE SEGURIDAD

0.00

010.05.04 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO PARCIAL est. 0.00

010.05.05 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

010.05.06 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

N° VECES 1.00

TOTAL est. 0.00

ESTIMADO PARCIAL est. 0.00

TOTAL METRADO est. 0.00

TOTAL METRADO est. 0.00

N° VECES 2.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.06.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL est. 0.00

Partida Especifica :

010.06.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : 010.07

1.00

TOTAL est.

0.00

IMPLEMENTOS DE SEGURIDAD

010.06

N° VECES

ESTIMADO PARCIAL est.

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

0.00

0.00

TOTAL METRADO : Partida Especifica :

1.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

010.07.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

IMPLEMENTOS DE SEGURIDAD

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011 0.00

TOTAL METRADO : Partida Especifica :

010.07.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL est. 0.00

011.01

0.00

TOTAL METRADO est. 0.00

IMPLEMENTOS DE SEGURIDAD IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.01.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

3.00

ESTIMADO PARCIAL est. 0.00

Partida Especifica :

011.01.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

3.00

N° VECES 2.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO :

3.00

ESTIMADO PARCIAL est. 9.00

N° VECES 2.00

TOTAL est. 18.00

TOTAL METRADO est. 18.00

18.00

TOTAL METRADO : 011.02

1.00

TOTAL est.

0.00

TOTAL METRADO :

011

N° VECES

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.02.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

2.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 2.00

2.50

ESTIMADO PARCIAL est. 10.00

011.02.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

011.02.03 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

0.00

TOTAL METRADO : Partida Especifica :

011.02.04 IMPLEMENTOS DE SEGURIDAD

10.00

0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

10.00

ESTIMADO PARCIAL est.

TOTAL METRADO : Partida Especifica :

1.00

TOTAL METRADO est.

10.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL est.

0.00

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

0.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS DESCRIPCION

MES DE MAYO 2011

DIMENSIONES DIST/LONG ALTURA ANCHO (ML) (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

2.00

2.50

ESTIMADO PARCIAL est. 1.3

011.03.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

0.00

ESTIMADO PARCIAL est. 0.00

Partida Especifica :

011.03.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

DIMENSIONES ALTURA ANCHO (ML) (ML) 0.00

N° VECES 1.00

TOTAL est. 0.00

0.00

ESTIMADO PARCIAL est. 0.00

TOTAL METRADO est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.04.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : 001.01

0.00

0.00

TOTAL METRADO :

001

0.00

TOTAL METRADO est.

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.04

0.00

TOTAL est.

0.00

TOTAL METRADO : 011.03

N° VECES

#N/A #N/A

Partida Especifica :

011.04.01 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO PARCIAL est. 0.00

011.04.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

011.04.03 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG

DIMENSIONES ALTURA ANCHO

0.00

ESTIMADO PARCIAL est.

0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : Partida Especifica :

1.00

TOTAL METRADO est.

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

TOTAL est.

ESTIMADO PARCIAL

N° VECES

TOTAL

TOTAL METRADO

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

SUSTENTACION DESCRIPCION

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

DE METRADOS (ML)

(ML)

(ML)

IMPLEMENTOS DE SEGURIDAD

MES DE MAYO 2011 N° VECES est.

0.00

011.04.04 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

011.04.05 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.05.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

4.20

0.00

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : 011.06

0.00

ESTIMADO PARCIAL est.

TOTAL METRADO : 011.05

1.00

TOTAL METRADO est.

0.00

TOTAL METRADO :

DESCRIPCION

N° VECES

TOTAL est.

ESTIMADO PARCIAL est. 0.00

011.04.06 IMPLEMENTOS DE SEGURIDAD

0.00

0.00

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

0.00

ESTIMADO PARCIAL est.

TOTAL METRADO : Partida Especifica :

est.

0.00

TOTAL METRADO : Partida Especifica :

1.00

est.

IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

011.06.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

IMPLEMENTOS DE SEGURIDAD

DIMENSIONES ALTURA ANCHO (ML) (ML)

0.00

ESTIMADO PARCIAL est. 0.00

011.06.02 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

IMPLEMENTOS DE SEGURIDAD

DIST/LONG (ML) 0.00

DIMENSIONES ALTURA ANCHO (ML) (ML)

1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO : Partida Especifica :

N° VECES

ESTIMADO PARCIAL est. 0.00

N° VECES 1.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA

Obra:

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES COMITÉ 7 DEL DISTRITO DE SAMEGUA"

SUSTENTACION DE METRADOS

MES DE MAYO 2011 0.00

TOTAL METRADO : Partida Especifica :

011.06.03 IMPLEMENTOS DE SEGURIDAD DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO PARCIAL est. 0.00

012.01

1.00

0.00

TOTAL METRADO est. 0.00

0.00

TOTAL METRADO :

012

N° VECES

TOTAL est.

IMPLEMENTOS DE SEGURIDAD IMPLEMENTOS DE SEGURIDAD

Partida Especifica :

012.01.01 IMPLEMENTOS DE SEGURIDAD

DESCRIPCION

DIST/LONG (ML)

DIMENSIONES ALTURA ANCHO (ML) (ML)

IMPLEMENTOS DE SEGURIDAD

ESTIMADO PARCIAL est. 0.00

TOTAL METRADO :

N° VECES 1.00

0.00

TOTAL est. 0.00

TOTAL METRADO est. 0.00

CONTROL DE AVANCE DE OBRA OBRA: MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES, COMITÉ 7 DEL DISTRITO DE SAMEGUA MES : DE MAYO 2011

Item 01.00.00 01.01.00 01.02.00 01.03.00 01.04.00 01.05.00 01.06.00 01.07.00 01.08.00 02.00.00 02.01.00 02.02.00 02.03.00 02.04.00 02.05.00 03.00.00 03.01.00 04.00.00 04.01.00 04.01.01 04.01.02 04.01.03 04.01.04 04.01.05 04.02.00 04.02.01 04.02.02 04.02.03 04.03.00 04.03.01 04.04.00 04.04.01 04.04.02 04.04.03 04.04.04 05.00.00 05.01.00 05.01.01 05.01.02 05.01.03 05.01.04 05.01.05 05.02.00 05.02.01 05.02.02 05.02.03 05.03.00 05.03.01 05.03.02 05.03.03 05.03.04 05.03.05 05.03.06 05.03.07 05.03.08 05.04.00 05.04.01 05.04.02 05.04.03 05.04.04 05.04.05 05.05.00 05.05.01 05.05.02 05.05.03 05.05.04 05.05.05 05.06.00 05.06.01 05.06.02 05.06.03 05.06.04 05.06.05 05.06.06 05.06.07 06.00.00 06.01.00 06.01.01 06.01.02

Descripción OBRAS Y TRABAJOS PROVISIONALES CERCO PROVISIONAL DE ESTERAS CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44 CASETA P/OFICINA RESIDENTE LETRINA PROVISIONAL P/PERSONAL OBRERO INSTALACION PROVISIONAL DE AGUA INSTALACION PROVISIONAL DE ENERGIA ELECTRICA ALMACEN Y CASETA DE GUARDIANIA IMPLEMENTOS DE SEGURIDAD OBRAS PRELIMINARES DESMONTAJE DE ARCOS DE FUTBOL DEMOLICION MANUAL DE LOSA DE CONCRETO DEMOLICION DE MUROS DE CONTENCION EXISTENTE TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA MOVILIZACION Y DESMOVILIZACION IMPACTO AMBIENTAL MITIGACION DE IMPACTO AMBIENTAL LOSA DEPORTIVA MOVIMIENTOS DE TIERRAS CORTE DE TERRENO NATURAL C/MAQUINARIA PERFILADO Y COMPACTADO EN LOSA DEPORTIVA BASE GRANULAR E=0.15m EXCAVACION MANUAL P/SARDINEL SUMERGIDO ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE OBRAS DE CONCRETO SIMPLE CONCRETO F'C=140KG/CM2 P/ SARDINEL SUMERGIDO CONCRETO F'C=140KG/CM2 PARA LOSA E=10CM ENCOFRADO Y DESENCOFRADO PARA LOSA PINTURA PINTURA ESMALTE DE LOSA CON FRANJA 0.05m OTROS CURADO DE SUPERFICIES HORIZONTALES JUNTAS RELLENAS CON ASFALTO PINTURA ARCO DE FULBITO INCLUYE TABLERO DE BASKET NET P/VOLEY INCL. PARANTES Y SOPORTE METALICO CERCO PERIMETRICO MOVIMIENTOS DE TIERRAS CORTE O EXCAVACION EN MATERIAL SUELTO MANUAL EXCAVACION DE ZANJAS PARA ZAPATAS MANUAL ACARREO DE MATERIAL EXCEDENTE HASTA 30m RELLENO CON MATERIAL PRESTAMO SELECCIONADO ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ 10m3 OBRAS DE CONCRETO SIMPLE SOLADO PARA ZAPATAS E=2" 1:12 (C:H) SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO H= 0.40m SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M. OBRAS DE CONCRETO ARMADO CONCRETO F'C=210KG/CM2 ZAPATAS ACERO FY= 4200KG/CM2 EN ZAPATAS ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA CONCRETO F'C=210KG/CM2 MUROS DE CONCRETO ACERO FY= 4200KG/CM2 MUROS ENCOFRADO Y DESENCOFRADO EN COLUMNAS CONCRETO F'C=210KG/CM2 COLUMNAS ACERO FY= 4200KG/CM2 CARPINTERIA METALICA REPARACION PUERTA METALICA SECUNDARIA SEGÚN DISEÑO CERCO METALICO MODULOS SEGÚN DISEÑO TIPO I CERCO METALICO MODULOS SEGÚN DISEÑO TIPO II PUERTA METALICA TIPO 1 SEGÚN DETALLE PINTURA ANTICORROSIVA P/CARP. MET. PINTURA PINTURA ESMALTE EN COLUMNAS PINTURA ESMALTE EN MUROS DE CONTENCION PINTURA ESMALTE EN GRADERIAS PINTURA ESMALTE EN SOBRECIMIENTOS PINTURA ESMALTE EN CARPINTERIA METALICA OTROS ENSAYO DE SUELO ENSAYO DE COMPACTACION PRUEBA DE CALIDAD JUNTAS DE CONSTRUCCION CON TECKNOPORT CURADO DE SUPERFICIES VERTICALES SOLAQUEADO DE OBRAS DE CONCRETO ARMADO IMPERMEABILIZACION DE MUROS CON ASFALTO GRADERIAS Y AREAS VERDES MOVIMIENTO DE TIERRA CORTE O EXCAVACION MANUAL EN TERRENO NATURAL RELLENO CON MATERIAL PROPIO C/EQUIPO

Unidad

Metrado

DO 01

LU 02

MA 03

MI 04

JU 05

VI 06

SA 07

DO 08

LU 09

MA 10

MI 11

JU 12

VI 13

SA 14

DO 15

LU 16

MA 17

MI 18

JU 19

VI 20

SA 21

DO 22

LU 23

MA 24

MI 25

JU 26

VI 27

SA 28

DO 29

LU 30

MA 31

ACUMULADO ANTERIOR Metrado

AVANCE ACTUAL Metrado

ACUMULADO ACTUAL Metrado

Metrado

0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00

0.00 100.00 1.00 24.00 1.00 1.00 0.00 36.00 1.00

0.00 0.00 10.73 16.64 1.00 0.00 1.00 0.00 0.00 0.00

2.00 160.00 41.77 703.36 2.00 0.00 2.00 0.00 0.00 24.00

0.00 0.00 0.00

160.00 1.20 24.00

0.00 0.00 0.00 0.00 0.00

1.20 16.00 8.00 0.00 369.19 160.00 40.00 2.00 1.00 0.00 0.00 321.70 26.33 22.20 250.00 398.00 0.00 64.65 28.00 2.10 0.00 2.50 50.00 170.30 59.41 1,097.30 39.90 2.21 742.80 0.00 2.50 10.00 22.00 9.60 219.43 0.00 39.90 112.50 67.20 33.25 219.43

m Und. m2 glb glb glb m2 est.

100.00 1.00 24.00 1.00 1.00 1.00 36.00 1.00

Und. m2 m3 m2 glb

2.00 160.00 52.50 720.00 3.00

glb

3.00

m3 m2 m2 m3 m3

24.00 160.00 160.00 1.20 24.00

0.00 0.00 0.00 0.00 0.00

m3 m2 m2

1.20 16.00 8.00

0.00 0.00 0.00

1.00

2.35

1.60

1.28

1.17

1.28

1.83

0.00 0.00 10.73 16.64 1.00

1.22 16.64

1.00 1.00

1.00

SALDO

ml

369.19

0.00

m2 ml est. est.

160.00 40.00 2.00 1.00

0.00 0.00 0.00 0.00

m3 m3 m3 m3 m3

358.00 40.00 40.00 250.00 398.00

m2 m2 m3

80.00 28.00 2.10

m3 KG m2 m3 KG m2 m3 KG

2.50 50.00 225.00 76.88 1977.94 39.90 2.21 742.80

m2 Und. Und. m2 m2

2.50 10.00 22.00 9.60 219.43

0.00 0.00 0.00 0.00 0.00

m2 m2 m2 m2 m2

39.90 112.50 67.20 33.25 219.43

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 36.30 13.67 62.20 0.00 0.00 0.00 15.35 0.00 0.00 0.00 0.00 0.00 54.70 17.47 880.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

glb glb Und. ml m2 m2 m2

2.00 5.00 10.00 27.00 112.50 112.50 112.50

0.00 1.00 0.00 0.00 0.00 54.70 0.00

0.00 1.00 0.00 0.00 0.00 54.70 0.00

2.00 4.00 10.00 27.00 112.50 57.80 112.50

m3 m3

38.82 4.00

0.00 0.00

0.00 0.00

38.82 4.00

5.20

5.00

6.50

6.25

2.50 3.00

5.20 2.60 9.75

2.00 2.50

5.20 2.62 9.63

4.50 2.80 9.13

5.20 6.50

36.30 13.67 62.20 0.00 0.00

6.00 7.50

1.15 1.44

15.35 0.00 0.00

15.35

44.20 9.47 492.00

0.00 0.00 54.70 17.47 880.64 0.00 0.00 0.00

10.50 8.00

388.64

1.00

54.70

06.01.03 06.01.04 06.02.00 06.02.01 06.03.00 06.03.01 06.03.02 06.03.03 06.04.00 06.04.01 06.04.02 06.04.03 06.04.04 06.04.05 06.04.06 06.04.07 06.05.00 06.05.01 06.05.02 06.06.00 06.06.01 06.06.02 06.06.03 06.06.04 06.06.05 06.06.06 06.06.07 06.06.08 06.06.09 06.06.10

ACARREO DE MATERIAL EXCEDENTE HASTA 30M ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE OBRAS DE CONCRETO SIMPLE CONCRETO 1:10 + 30% P.G. P/CIMIENTO OBRAS DE CONCRETO ARMADO CONCRETO F'C=175KG/CM2 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CARAVISTA ACERO FY=4200KG/CM2 INSTALACIONES SANITARIAS EMPALME DE TUBERIA A RED EXISTENTE DE PVC 4" C/ABRAZADERA DE 4" A 3/4" CAJA CONCRETO 0.60X0.60X0.40M CAJA DE CONCRETO P/MEDIDOR EXCAVACION DE ZANJAS MANUAL P/AGUA RELLENO CON MATERIAL PROPIO SELECCIONADO Y COMPACTADO TUBERIA PVC SAP 3/4" VALVULA COMPUERTA DE BRONCE DE 3/4" PINTURA PINTURA ESMALTE EN SARDINELES PINTURA CON BREA EN JARDINERIAS OTROS JUNTAS RELLENAS CON ASFALTO CAPSULAS PARA BASURERO SEGÚN DISEÑO PREPARACION DE TERRENO P/JARDINERIA SIEMBRA DE GRASS SUMINISTRO E INSTALACION DE FLORES/ARBOLES JARDINERIAS PARA INS/ARBOLES ESTRUCTURA METALICA EN GRADERIA SEGÚN DISEÑO SUMINISTRO E INSTALACION DE POSTES C/REFLECTOR ILUMINACION DE CANCHA REHUBICACION DE POSTES DE CONCRETO

m3 m3

38.82 29.95

0.00 0.00

0.00 0.00

38.82 29.95

m3

28.82

0.00

0.00

28.82

m3 m2 kg

6.43 55.20 213.23

0.00 0.00 0.00

0.00 0.00 0.00 0.00

6.43 55.20 213.23 0.00

Und. Und. Und. m3 m3 ml Und.

1.00 2.00 1.00 6.00 5.04 15.00 1.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

2.00 1.00 6.00 5.04 15.00 1.00

m2 m2

75.90 27.60

0.00 0.00

0.00 0.00

75.90 27.60

ml Und. m2 m2 Und. Und. glb Und. glb Und.

8.00 2.00 77.50 15.50 10.00 10.00 1.00 4.00 1.00 2.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8.00 2.00 77.50 15.50 10.00 10.00 1.00 4.00 1.00 2.00

07.00.00 07.01.00 07.01.01

LOSA DEPORTIVA OBRAS PRELIMINARES DEMOLICION DE LOSA DE CONCRETO MANUAL

MATERIALES UTILIZADOS CEMENTO ARENA GRUESA PIEDRA CHANCADA DE 1/2" PIEDRA DE 4" MATERIAL BASE COMBUSTIBLE GASOLINA 84 OCTANOS PETROLEO D-2

CAMION GRUPO ELECTROGENO

M3

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

9.00

96.00

6.00

UNIDAD CANTIDAD BOLSA 650.00 M3 70.00 M3 70.00 M3 66.00

GLN GLN

DIA

150

3

2

1.00

1.00

1.00

1.00

6.00

Obra:

MUNICIPALIDAD DISTRITAL DE SAMEGUA

ITEM

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES, COMITE 7 DEL DISTRITO DE SAMEGUA"

DESCRIPCION

UNIDAD

CANTIDAD

01.00.00

OBRAS Y TRABAJOS PROVISIONALES

01.01.00

CERCO PROVISIONAL DE ESTERAS

m

0.00

01.02.00

CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44

Und.

0.00

01.03.00

CASETA P/OFICINA RESIDENTE

m2

0.00

01.04.00

LETRINA PROVISIONAL P/PERSONAL OBRERO

glb

0.00

01.05.00

INSTALACION PROVISIONAL DE AGUA

glb

0.00

01.06.00

INSTALACION PROVISIONAL DE ENERGIA ELECTRICA

glb

1.00

01.07.00

ALMACEN Y CASETA DE GUARDIANIA

m2

0.00

01.08.00 02.00.00

IMPLEMENTOS DE SEGURIDAD OBRAS PRELIMINARES

est.

0.00

02.01.00

DESMONTAJE DE ARCOS DE FUTBOL

Und.

0.00

02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

m2

0.00

02.03.00

DEMOLICION DE MUROS DE CONTENCION EXISTENTE

m3

10.73

02.04.00

TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA

m2

16.64

02.05.00 03.00.00

MOVILIZACION Y DESMOVILIZACION IMPACTO AMBIENTAL

glb

1.00

03.01.00 04.00.00

MITIGACION DE IMPACTO AMBIENTAL LOSA DEPORTIVA

glb

1.00

04.01.00

MOVIMIENTOS DE TIERRAS

04.01.01

CORTE DE TERRENO NATURAL C/MAQUINARIA

m3

0.00

04.01.02

PERFILADO Y COMPACTADO EN LOSA DEPORTIVA

m2

0.00

04.01.03

BASE GRANULAR E=0.15m

m2

0.00

04.01.04

EXCAVACION MANUAL P/SARDINEL SUMERGIDO

m3

0.00

04.01.05 04.02.00

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE OBRAS DE CONCRETO SIMPLE

m3

0.00

04.02.01

CONCRETO F'C=140KG/CM2 P/ SARDINEL SUMERGIDO

m3

0.00

04.02.02

CONCRETO F'C=140KG/CM2 PARA LOSA E=10CM

m2

0.00

04.02.03 04.03.00

ENCOFRADO Y DESENCOFRADO PARA LOSA PINTURA

m2

0.00

04.03.01 04.04.00

PINTURA ESMALTE DE LOSA CON FRANJA 0.05m OTROS

ml

0.00

04.04.01

CURADO DE SUPERFICIES HORIZONTALES

m2

0.00

04.04.02

JUNTAS RELLENAS CON ASFALTO

ml

0.00

04.04.03

PINTURA ARCO DE FULBITO INCLUYE TABLERO DE BASKET

est.

0.00

04.04.04

NET P/VOLEY INCL. PARANTES Y SOPORTE METALICO

est.

0.00

05.00.00

CERCO PERIMETRICO

05.01.00

MOVIMIENTOS DE TIERRAS

05.01.01

CORTE O EXCAVACION EN MATERIAL SUELTO MANUAL

m3

36.30

05.01.02

EXCAVACION DE ZANJAS PARA ZAPATAS MANUAL

m3

13.67

05.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30m

m3

62.20

05.01.04

RELLENO CON MATERIAL PRESTAMO SELECCIONADO

m3

0.00

05.01.05 05.02.00

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ 10m3 OBRAS DE CONCRETO SIMPLE

m3

0.00

05.02.01

SOLADO PARA ZAPATAS E=2" 1:12 (C:H)

m2

15.35

05.02.02

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO H= 0.40m

m2

0.00

Obra:

MUNICIPALIDAD DISTRITAL DE SAMEGUA

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES, COMITE 7 DEL DISTRITO DE SAMEGUA"

ITEM

DESCRIPCION

05.02.03 05.03.00

SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M. OBRAS DE CONCRETO ARMADO

05.03.01 05.03.02

UNIDAD

CANTIDAD

m3

0.00

CONCRETO F'C=210KG/CM2 ZAPATAS

m3

0.00

ACERO FY= 4200KG/CM2 EN ZAPATAS

KG

0.00

05.03.03

ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA

m2

54.70

05.03.04

CONCRETO F'C=210KG/CM2 MUROS DE CONCRETO

m3

17.47

05.03.05

ACERO FY= 4200KG/CM2 MUROS

KG

880.64

05.03.06

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

m2

0.00

05.03.07

CONCRETO F'C=210KG/CM2 COLUMNAS

m3

0.00

05.03.08

ACERO FY= 4200KG/CM2

KG

0.00

05.04.00

CARPINTERIA METALICA

05.04.01

REPARACION PUERTA METALICA SECUNDARIA SEGÚN DISEÑO

m2

0.00

05.04.02

CERCO METALICO MODULOS SEGÚN DISEÑO TIPO I

Und.

0.00

05.04.03

CERCO METALICO MODULOS SEGÚN DISEÑO TIPO II

Und.

0.00

05.04.04

PUERTA METALICA TIPO 1 SEGÚN DETALLE

m2

0.00

05.04.05 05.05.00

PINTURA ANTICORROSIVA P/CARP. MET. PINTURA

m2

0.00

05.05.01

PINTURA ESMALTE EN COLUMNAS

m2

0.00

05.05.02

PINTURA ESMALTE EN MUROS DE CONTENCION

m2

0.00

05.05.03

PINTURA ESMALTE EN GRADERIAS

m2

0.00

05.05.04

PINTURA ESMALTE EN SOBRECIMIENTOS

m2

0.00

05.05.05 05.06.00

PINTURA ESMALTE EN CARPINTERIA METALICA OTROS

m2

0.00

05.06.01

ENSAYO DE SUELO

glb

0.00

05.06.02

ENSAYO DE COMPACTACION

glb

1.00

05.06.03

PRUEBA DE CALIDAD

Und.

0.00

05.06.04

JUNTAS DE CONSTRUCCION CON TECKNOPORT

ml

0.00

05.06.05

CURADO DE SUPERFICIOS VERTICALES

m2

0.00

05.06.06

SOLAQUEADO DE OBRAS DE CONCRETO ARMADO

m2

54.70

05.06.07 06.00.00

IMPERMEABILIZACION DE MUROS CON ASFALTO GRADERIAS Y AREAS VERDES

m2

0.00

06.01.00

MOVIMIENTO DE TIERRA

06.01.01

CORTE O EXCAVACION MANUAL EN TERRENO NATURAL

m3

0.00

06.01.02

RELLENO CON MATERIAL PROPIO C/EQUIPO

m3

0.00

06.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30M

m3

0.00

06.01.04 06.02.00

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE OBRAS DE CONCRETO SIMPLE

m3

0.00

06.02.01 06.03.00

CONCRETO 1:10 + 30% P.G. P/CIMIENTO OBRAS DE CONCRETO ARMADO

m3

0.00

06.03.01

CONCRETO F'C=175KG/CM2

m3

0.00

06.03.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CARAVISTA

m2

0.00

06.03.03 06.04.00

ACERO FY=4200KG/CM2 INSTALACIONES SANITARIAS

kg

0.00

06.04.01

EMPALME DE TUBERIA A RED EXISTENTE DE PVC 4" C/ABRAZADERA DE 4" A 3/4"

Und.

0.00

06.04.02

CAJA CONCRETO 0.60X0.60X0.40M

Und.

0.00

Obra:

MUNICIPALIDAD DISTRITAL DE SAMEGUA

ITEM

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES, COMITE 7 DEL DISTRITO DE SAMEGUA"

DESCRIPCION

UNIDAD

CANTIDAD

06.04.03

CAJA DE CONCRETO P/MEDIDOR

Und.

0.00

06.04.04

EXCAVACION DE ZANJAS MANUAL P/AGUA

m3

0.00

06.04.05

RELLENO CON MATERIAL PROPIO SELECCIONADO Y COMPACTADO

m3

0.00

06.04.06

TUBERIA PVC SAP 3/4"

ml

0.00

06.04.07 06.05.00

VALVULA COMPUERTA DE BRONCE DE 3/4" PINTURA

Und.

0.00

06.05.01

PINTURA ESMALTE EN SARDINELES

m2

0.00

06.05.02 06.06.00

PINTURA CON BREA EN JARDINERIAS OTROS

m2

0.00

06.06.01

JUNTAS RELLENAS CON ASFALTO

ml

0.00

06.06.02

CAPSULAS PARA BASURERO SEGÚN DISEÑO

Und.

0.00

06.06.03

PREPARACION DE TERRENO P/JARDINERIA

m2

0.00

06.06.04

SIEMBRA DE GRASS

m2

0.00

06.06.05

SUMINISTRO E INSTALACION DE FLORES/ARBOLES

Und.

0.00

06.06.06

JARDINERIAS PARA INS/ARBOLES

Und.

0.00

06.06.07

ESTRUCTURA METALICA EN GRADERIA SEGÚN DISEÑO

glb

0.00

06.06.08

SUMINISTRO E INSTALACION DE POSTES C/REFLECTOR

Und.

0.00

06.06.09

ILUMINACION DE CANCHA

glb

0.00

06.06.10

REHUBICACION DE POSTES DE CONCRETO

Und.

0.00

RESIDENTE DE OBRA

Obra:

MUNICIPALIDAD DISTRITAL DE SAMEGUA OBRA MODALIDAD DE EJECUCION FINANCIAMIENTO PRESUPUESTO PLAZO DE EJECUCION FECHA DE INICIO DE OBRA REGION PROVINCIA DISTRITO RESIDENTE DE OBRA INSPECTOR DE OBRA ASISTENTE TECNICO MES DE REPORTE INFORME AL MES DE INFORMES MAYO

"MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES, COMITE 7 DEL DISTRITO DE SAMEGUA"

MANTENIMIENTO DE LOSA DEPORTIVA EN LA JUNTA VECINAL MIRAFLORES, COMITÉ 7 DEL DISTRITO DE SAMEGUA ADMINISTRACION DIRECTA CANON, SOBRECANON Y REGALIAS MINERAS 283,127.04 90 DIAS CALENDARIO 12 DE AGOSTO DEL 2010 MOQUEGUA MARISCAL NIETO SAMEGUA Ing. EDY FLORES SOSA Ing. FREDY MARCA HUANCA Bach, Ing. RENE JHONSON FLORES MAMANI 04 al 31 DE MAYO DEL 2011 MAYO 2011

01

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

VALORIZACIÓN SEGÚN EXPEDIENTE TECNICO PARTIDA

DESCRIPCION

UND

PRESUPUESTO METRADOS

P.U

01.00.00 OBRAS Y TRABAJOS PROVISIONALES 01.01.00

CERCO PROVISIONAL DE ESTERAS

01.02.00

CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44

01.03.00

CASETA P/OFICINA RESIDENTE

01.04.00

LETRINA PROVISIONAL P/PERSONAL OBRERO

01.05.00

INSTALACION PROVISIONAL DE AGUA

01.06.00

INSTALACION PROVISIONAL DE ENERGIA ELECTRICA

01.07.00

ALMACEN Y CASETA DE GUARDIANIA

01.08.00

IMPLEMENTOS DE SEGURIDAD DESMONTAJE DE ARCOS DE FUTBOL

02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

02.03.00

DEMOLICION DE MUROS DE CONTENCION EXISTENTE

02.04.00

TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA

02.05.00

MOVILIZACION Y DESMOVILIZACION

m Und. m2 glb glb glb m2 est.

MITIGACION DE IMPACTO AMBIENTAL

CORTE DE TERRENO NATURAL C/MAQUINARIA

04.01.02

PERFILADO Y COMPACTADO EN LOSA DEPORTIVA

04.01.03

BASE GRANULAR E=0.15m

04.01.04

EXCAVACION MANUAL P/SARDINEL SUMERGIDO

04.01.05

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE

%

AVANCE MES ACTUAL METRADO

MONTO

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

%

SALDO ACTUAL METRADO

MONTO

%

17.73

1,773.00

100.00

1,773.00

100.00%

0.00

0.00

0.00%

100.00

1,773.00

100.00%

0.00

0.00

0.00%

1.00

957.81

957.81

1.00

957.81

100.00%

0.00

0.00

0.00%

1.00

957.81

100.00%

0.00

0.00

0.00%

24.00

155.49

3,731.76

24.00

3,731.76

100.00%

0.00

0.00

0.00%

24.00

3,731.76

100.00%

0.00

0.00

0.00%

1.00

243.57

243.57

1.00

243.57

100.00%

0.00

0.00

0.00%

1.00

243.57

100.00%

0.00

0.00

0.00%

1.00

455.88

455.88

1.00

455.88

100.00%

0.00

0.00

0.00%

1.00

455.88

100.00%

0.00

0.00

0.00%

1.00

455.88

455.88

0.00

0.00

0.00%

1.00

455.88

100.00%

1.00

455.88

100.00%

0.00

0.00

0.00%

36.00

25.89

932.04

36.00

932.04

100.00%

0.00

0.00

0.00%

36.00

932.04

100.00%

0.00

0.00

0.00%

1.00

5,000.00

5,000.00

1.00

5,000.00

100.00%

0.00

0.00

0.00%

1.00

5,000.00

100.00%

0.00

0.00

0.00% 0.00%

26,970.79

Und. m2 m3 m2 glb

2.00

132.47

264.94

2.00

264.94

100.00%

0.00

0.00

0.00%

2.00

264.94

100.00%

0.00

0.00

160.00

17.73

2,836.80

160.00

2,836.80

100.00%

0.00

0.00

0.00%

160.00

2,836.80

100.00%

0.00

0.00

0.00%

52.50

230.10

12,080.25

33.17

7,632.42

63.18%

10.73

2,468.97

20.44%

43.90

10,101.39

83.62%

8.60

1,978.86

16.38%

720.00

1.79

1,288.80

0.00

0.00

0.00%

16.64

29.79

2.31%

16.64

29.79

2.31%

703.36

1,259.01

97.69%

3.00

3,500.00

10,500.00

1.00

3,500.00

33.33%

1.00

3,500.00

33.33%

2.00

7,000.00

66.67%

1.00

3,500.00

33.33%

1.00

300.00

33.33%

1.00

300.00

33.33%

2.00

600.00

66.67%

1.00

300.00

33.33%

900.00

glb

3.00

300.00

04.00.00 LOSA DEPORTIVA 04.01.00 MOVIMIENTOS DE TIERRAS 04.01.01

MONTO

100.00

03.00.00 IMPACTO AMBIENTAL 03.01.00

METRADO

13,549.94

02.00.00 OBRAS PRELIMINARES 02.01.00

AVANCE ACUMULADO ANTERIOR PARCIAL

900.00 9,126.27 5,290.60

m3 m2 m2 m3 m3

24.00

0.50

12.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

12.00

100.00%

160.00

8.68

1,388.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

1,388.80

100.00%

160.00

19.98

3,196.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

3,196.80

100.00%

1.20

26.10

31.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.20

31.32

100.00%

24.00

27.57

661.68

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

661.68

100.00%

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

FECHA DE INICIO DE OBRA 04.02.00 OBRAS DE CONCRETO SIMPLE 04.02.01

CONCRETO F'C=140KG/CM2 P/ SARDINEL SUMERGIDO

04.02.02

CONCRETO F'C=140KG/CM2 PARA LOSA E=10CM

04.02.03

ENCOFRADO Y DESENCOFRADO PARA LOSA

1,170.60

m3 m2 m2

1.20

274.43

329.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.20

329.32

100.00%

16.00

37.77

604.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

16.00

604.32

100.00%

8.00

29.62

236.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

8.00

236.96

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

369.19

557.48

100.00%

04.03.00 PINTURA 04.03.01

PINTURA ESMALTE DE LOSA CON FRANJA 0.05m

557.48

ml

369.19

1.51

04.04.00 OTROS 04.04.01

CURADO DE SUPERFICIES HORIZONTALES

04.04.02

JUNTAS RELLENAS CON ASFALTO

04.04.03

PINTURA ARCO DE FULBITO INCLUYE TABLERO DE BASKET

04.04.04

NET P/VOLEY INCL. PARANTES Y SOPORTE METALICO

m2 ml est. est.

160.00

7.35

1,176.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

1,176.00

100.00%

40.00

5.79

231.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

40.00

231.60

100.00%

2.00

100.00

200.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

200.00

100.00%

1.00

500.00

500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

500.00

100.00%

05.00.00 CERCO PERIMETRICO 05.01.00 MOVIMIENTOS DE TIERRAS 05.01.01

CORTE O EXCAVACION EN MATERIAL SUELTO MANUAL

05.01.02

EXCAVACION DE ZANJAS PARA ZAPATAS MANUAL

05.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30m

05.01.04

RELLENO CON MATERIAL PRESTAMO SELECCIONADO

05.01.05

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ 10m3

149,159.60 30,949.76

m3 m3 m3 m3 m3

358.00

0.50

179.00

211.83

105.92

59.17%

36.30

18.15

10.14%

248.13

124.07

69.31%

109.87

54.94

30.69%

40.00

30.41

1,216.40

26.33

800.70

65.83%

13.67

415.70

34.18%

40.00

1,216.40

100.00%

0.00

0.00

0.00%

40.00

17.40

696.00

29.15

507.21

72.88%

10.85

188.79

27.13%

40.00

696.00

100.00%

0.00

0.00

0.00%

250.00

77.91

19,477.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

250.00

19,477.50

100.00%

398.00

23.57

9,380.86

90.00

2,121.30

22.61%

0.00

0.00

0.00%

90.00

2,121.30

22.61%

308.00

7,259.56

77.39%

05.02.00 OBRAS DE CONCRETO SIMPLE 05.02.01

SOLADO PARA ZAPATAS E=2" 1:12 (C:H)

05.02.02

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO H= 0.40m

05.02.03

SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M.

557.48 2,107.60

4,313.95

m2 m2 m3

80.00

28.69

2,295.20

64.65

1,854.81

80.81%

15.35

440.39

19.19%

80.00

2,295.20

100.00%

0.00

0.00

0.00%

28.00

52.32

1,464.96

20.67

1,081.45

73.82%

0.00

0.00

0.00%

20.67

1,081.45

73.82%

7.33

383.51

26.18%

2.10

263.71

553.79

1.03

271.62

49.05%

0.00

0.00

0.00%

1.03

271.62

49.05%

1.07

282.17

50.95%

05.03.00 OBRAS DE CONCRETO ARMADO m3 KG 05.03.03 ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA m2 05.03.04 CONCRETO F'C=210KG/CM2 MUROS DE CONCRETO m3 05.03.05 ACERO FY= 4200KG/CM2 MUROS KG 05.03.06 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 05.03.07 CONCRETO F'C=210KG/CM2 COLUMNAS m3 05.03.08 ACERO FY= 4200KG/CM2 KG 05.04.00 CARPINTERIA METALICA 05.04.01 REPARACION PUERTA METALICA SECUNDARIA SEGÚN DISEÑO m2 05.04.02 CERCO METALICO MODULOS SEGÚN DISEÑO TIPO I Und. 05.04.03 CERCO METALICO MODULOS SEGÚN DISEÑO TIPO II Und. 05.04.04 PUERTA METALICA TIPO 1 SEGÚN DETALLE m2 05.04.05 PINTURA ANTICORROSIVA P/CARP. MET. m2 05.05.00 PINTURA 05.05.01 PINTURA ESMALTE EN COLUMNAS m2 05.05.02 PINTURA ESMALTE EN MUROS DE CONTENCION m2 05.05.03 PINTURA ESMALTE EN GRADERIAS m2 05.05.04 PINTURA ESMALTE EN SOBRECIMIENTOS m2

81,183.90

05.03.01

CONCRETO F'C=210KG/CM2 ZAPATAS

2.50

446.14

1,115.35

1.50

669.21

60.00%

0.00

0.00

0.00%

1.50

669.21

60.00%

1.00

446.14

40.00%

05.03.02

ACERO FY= 4200KG/CM2 EN ZAPATAS

50.00

7.23

361.50

25.62

185.23

51.24%

0.00

0.00

0.00%

25.62

185.23

51.24%

24.38

176.27

48.76%

225.00

99.52

22,392.00

170.31

16,949.25

75.69%

54.69

5,442.75

24.31%

225.00

22,392.00

100.00%

0.00

0.00

0.00%

76.88

447.11

34,373.82

59.08

26,415.26

76.85%

17.47

7,811.01

22.72%

76.55

34,226.27

99.57%

0.33

147.55

0.43%

1,977.94

7.23

14,300.51

1,180.01

8,531.47

59.66%

797.93

5,769.03

40.34%

1,977.94

14,300.51

100.00%

0.00

0.00

0.00%

39.90

56.44

2,251.96

31.00

1,749.64

77.69%

0.00

0.00

0.00%

31.00

1,749.64

77.69%

8.90

502.32

22.31%

2.21

460.78

1,018.32

1.69

778.72

76.47%

0.00

0.00

0.00%

1.69

778.72

76.47%

0.52

239.61

23.53%

742.80

7.23

5,370.44

380.74

2,752.75

51.26%

0.00

0.00

0.00%

380.74

2,752.75

51.26%

362.06

2,617.69

48.74%

23,098.11 2.50

116.76

291.90

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.50

291.90

100.00%

10.00

550.48

5,504.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

5,504.80

100.00%

22.00

550.48

12,110.56

22.00

12,110.56

100.00%

0.00

0.00

0.00%

22.00

12,110.56

100.00%

0.00

0.00

0.00%

9.60

425.97

4,089.31

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

9.60

4,089.31

100.00%

219.43

5.02

1,101.54

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

219.43

1,101.54

100.00%

6,828.92 39.90

18.78

749.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

39.90

749.32

100.00%

112.50

18.78

2,112.75

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

112.50

2,112.75

100.00%

67.20

18.78

1,262.02

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

67.20

1,262.02

100.00%

33.25

18.39

611.47

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

33.25

611.47

100.00%

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011 219.43 9.54 m2

INSPECTOR DE OBRA

05.05.05

PINTURA ESMALTE EN CARPINTERIA METALICA

05.06.00 OTROS 05.06.01

ENSAYO DE SUELO

2,093.36

: Ing. FREDY MARCA HUANCA

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

219.43

2,093.36

100.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

300.00

100.00%

2,784.96

glb

2.00

150.00

300.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011 5.00 25.00 glb 10.00 25.00 Und. 27.00 3.48 ml 112.50 0.51 m2 112.50 11.34 m2 112.50 6.07 m2

INSPECTOR DE OBRA

05.06.02

ENSAYO DE COMPACTACION

05.06.03

PRUEBA DE CALIDAD

05.06.04

JUNTAS DE CONSTRUCCION CON TECKNOPORT

05.06.05

CURADO DE SUPERFICIES VERTICALES

05.06.06

SOLAQUEADO DE OBRAS DE CONCRETO ARMADO

05.06.07

IMPERMEABILIZACION DE MUROS CON ASFALTO

06.00.00 GRADERIAS Y AREAS VERDES 06.01.00 MOVIMIENTO DE TIERRA 06.01.01

CORTE O EXCAVACION MANUAL EN TERRENO NATURAL

06.01.02

RELLENO CON MATERIAL PROPIO C/EQUIPO

06.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30M

06.01.04

ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE CONCRETO 1:10 + 30% P.G. P/CIMIENTO CONCRETO F'C=175KG/CM2

06.03.02

ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CARAVISTA

06.03.03

ACERO FY=4200KG/CM2

0.00%

1.00

25.00

20.00%

1.00

25.00

20.00%

4.00

100.00

80.00%

250.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

250.00

100.00%

93.96

11.20

38.98

41.48%

0.00

0.00

0.00%

11.20

38.98

41.48%

15.80

54.98

58.52%

57.38

35.46

18.08

31.52%

0.00

0.00

0.00%

35.46

18.08

31.52%

77.04

39.29

68.48%

1,275.75

35.46

402.12

31.52%

54.70

620.30

48.62%

90.16

1,022.41

80.14%

22.34

253.34

19.86%

682.88

84.15

510.79

74.80%

0.00

0.00

0.00%

84.15

510.79

74.80%

28.35

172.08

25.20%

84.60%

38.82

30.41

1,180.52

5.98

181.85

15.40%

0.00

0.00

0.00%

5.98

181.85

15.40%

32.84

998.66

4.00

41.35

165.40

4.00

165.40

100.00%

0.00

0.00

0.00%

4.00

165.40

100.00%

0.00

0.00

0.00%

38.82

17.40

675.47

7.78

135.37

20.04%

0.00

0.00

0.00%

7.78

135.37

20.04%

31.04

540.10

79.96%

29.95

27.57

825.72

7.80

215.05

26.04%

0.00

0.00

0.00%

7.80

215.05

26.04%

22.15

610.68

73.96%

5.98

1,159.76

20.75%

0.00

0.00

0.00%

5.98

1,159.76

20.75%

22.84

4,429.59

79.25%

5,589.35

m3

28.82

193.94

5,589.35 7,795.27

m3 m2 kg

6.43

389.75

2,506.09

6.43

2,506.09

100.00%

0.00

0.00

0.00%

6.43

2,506.09

100.00%

0.00

0.00

0.00%

55.20

67.89

3,747.53

55.20

3,747.53

100.00%

0.00

0.00

0.00%

55.20

3,747.53

100.00%

0.00

0.00

0.00%

213.23

7.23

1,541.65

202.72

1,465.67

95.07%

0.00

0.00

0.00%

202.72

1,465.67

95.07%

10.51

75.99

4.93%

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

78.83

100.00%

06.04.00 INSTALACIONES SANITARIAS 06.04.01

0.00

2,847.11

m3 m3 m3 m3

06.03.00 OBRAS DE CONCRETO ARMADO 06.03.01

0.00

43,948.32

06.02.00 OBRAS DE CONCRETO SIMPLE 06.02.01

: Ing. FREDY MARCA HUANCA

125.00

EMPALME DE TUBERIA A RED EXISTENTE DE PVC 4" C/ABRAZADERA DE 4" A 3/4" Und.

966.36 1.00

78.83

78.83

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011 06.04.02 CAJA CONCRETO 0.60X0.60X0.40M 2.00 95.82 Und. 06.04.03 CAJA DE CONCRETO P/MEDIDOR 1.00 84.66 Und. 06.04.04 EXCAVACION DE ZANJAS MANUAL P/AGUA 6.00 30.41 m3 06.04.05 RELLENO CON MATERIAL PROPIO SELECCIONADO Y COMPACTADO 5.04 41.91 m3 06.04.06 TUBERIA PVC SAP 3/4" 15.00 10.52 ml 06.04.07 VALVULA COMPUERTA DE BRONCE DE 3/4" 1.00 59.74 Und. 06.05.00 PINTURA 06.05.01 PINTURA ESMALTE EN SARDINELES 75.90 9.96 m2 06.05.02 PINTURA CON BREA EN JARDINERIAS 27.60 8.49 m2 06.06.00 OTROS 06.06.01 JUNTAS RELLENAS CON ASFALTO 8.00 5.79 ml 06.06.02 CAPSULAS PARA BASURERO SEGÚN DISEÑO 2.00 220.65 Und. 06.06.03 PREPARACION DE TERRENO P/JARDINERIA 77.50 22.12 m2 06.06.04 SIEMBRA DE GRASS 15.50 4.35 m2 06.06.05 SUMINISTRO E INSTALACION DE FLORES/ARBOLES 10.00 39.06 Und. 06.06.06 JARDINERIAS PARA INS/ARBOLES 10.00 60.00 Und. 06.06.07 ESTRUCTURA METALICA EN GRADERIA SEGÚN DISEÑO 1.00 10,000.00 glb 06.06.08 SUMINISTRO E INSTALACION DE POSTES C/REFLECTOR 4.00 1,500.00 Und. 06.06.09 ILUMINACION DE CANCHA 1.00 5,000.00 glb 06.06.10 REHUBICACION DE POSTES DE CONCRETO 2.00 750.00 Und. COSTO DIRECTO (S/.)

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

191.64

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

191.64

100.00%

84.66

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

84.66

100.00%

182.46

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

182.46

100.00%

211.23

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.04

211.23

100.00%

157.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.00

157.80

100.00%

59.74

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

59.74

100.00%

755.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

75.90

755.96

100.00%

234.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

27.60

234.32

100.00%

990.29

25,759.95 46.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

8.00

46.32

100.00%

441.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

441.30

100.00%

1,714.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

77.50

1,714.30

100.00%

67.43

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.50

67.43

100.00%

390.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

390.60

100.00%

600.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

600.00

100.00%

10,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

10,000.00

100.00%

6,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

4.00

6,000.00

100.00%

5,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

5,000.00

100.00%

1,500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

1,500.00

100.00%

243,654.94

115,060.00

47.22%

27,485.77

11.28%

142,545.77

58.50%

101,109.15

41.50%

21,928.94

21,928.94

10,355.40

47.22%

2,473.72

11.28%

12,829.12

58.50%

9,099.83

41.50%

GASTOS DE SUPERVISION

7,309.65

7,309.65

3,451.80

47.22%

824.57

11.28%

4,276.37

58.50%

3,033.28

41.50%

GASTOS DE LIQUIDACION

1,461.93

1,461.93

690.36

47.22%

164.91

11.28%

855.27

58.50%

606.66

41.50%

GASTOS GENERALES DE GESTION ADMINISTRATIVA

7,309.65

7,309.65

3,451.80

47.22%

824.57

11.28%

4,276.37

58.50%

3,033.28

41.50%

GASTOS GENERALES DE SEGURIDAD EN OBRA

1,461.93

1,461.93

39,472.10

18,639.72

47.22%

4,452.69

11.28%

23,092.41

58.50%

16,379.69

41.50%

283,127.04

133,699.72

47.22%

31,938.46

11.28%

165,638.18

58.50%

117,488.84

41.50%

GASTOS GENERALES

COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

VALORIZACIÓN (MAYORES METRADOS) MES DE OCTUBRE 2010 OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04DE MAYO DEL 2011

INSPECTOR DEOBRA

: Ing.

PARTIDA

DESCRIPCION

UND

PRESUPUESTO METRADOS

P.U

02.00.00 OBRAS PRELIMINARES 02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

ACARREO DE MATERIAL EXCEDENTE HASTA 30m

METRADO

MONTO

AVANCE MES ACTUAL

%

METRADO

MONTO

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

SALDO ACTUAL

%

METRADO

MONTO

%

0.00

m2

0.00

17.73

05.00.00 CERCO PERIMETRICO 05.01.00 MOVIMIENTOS DE TIERRAS 05.01.03

AVANCE ACUMULADO ANTERIOR PARCIAL

0.00

0.00

0.00

-

640.00

11,347.20

-

640.00

11,347.20

-

640.00

-11,347.20

-

0.00

0.00

-

51.35

893.49

-

51.35

893.49

-

51.35

-893.49

-

0.00 0.00

m3

0.00

17.40

05.03.00 OBRAS DE CONCRETO ARMADO

0.00 0.00

05.03.03

ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA m2

0.00

99.52

0.00

0.00

0.00

-

0.01

1.00

-

0.01

1.00

-

0.01

-1.00

-

05.03.05

ACERO FY= 4200KG/CM2 MUROS

KG

0.00

7.23

0.00

0.00

0.00

-

82.71

597.99

-

82.71

597.99

-

82.71

-597.99

-

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

COSTO DIRECTO (S/.)

243,654.94

0.00

0.00%

12,839.68

5.27%

12,839.68

5.27%

-12,839.68

-5.27%

21,928.94

21,928.94

10,355.40

47.22%

2,473.72

11.28%

12,829.12

58.50%

9,099.83

41.50%

GASTOS DE SUPERVISION

7,309.65

7,309.65

3,451.80

47.22%

824.57

11.28%

4,276.37

58.50%

3,033.28

41.50%

GASTOS DE LIQUIDACION

1,461.93

1,461.93

690.36

47.22%

164.91

11.28%

855.27

58.50%

606.66

41.50%

GASTOS GENERALES DE GESTION ADMINISTRATIVA

7,309.65

7,309.65

3,451.80

47.22%

824.57

11.28%

4,276.37

58.50%

3,033.28

41.50%

GASTOS GENERALES DE SEGURIDAD EN OBRA

1,461.93

39,472.10

0.00

0.00%

2,080.03

5.27%

2,080.03

5.27%

37,392.07

94.73%

283,127.04

0.00

0.00%

14,919.71

5.27%

14,919.71

5.27%

24,552.39

8.67%

GASTOS GENERALES

COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

1,461.93

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

VALORIZACIÓN (PARTIDAS ADICIONALES) MES DE MAYO 2011 A A.01 A.01.01 A.01.02 B B1.01 B.01.01 B2.01 B.02.01 C C3.01 C.03.01

LOSA DEPORTIVA MOVIMIENTOS DE TIERRAS 0.00 ACARREO DE MATERIAL EXCEDENTE HASTA 40 mt. m3 0.00 LIMPIEZA m2 CERCO PERIMETRICO MOVIMIENTOS DE TIERRAS 0.00 PERFILADO Y COMPACTADO EN ZAPATA DE MURO m3 OBRAS DE CONCRETO ARMADO 0.00 HABILITADO DE MADERA P/ENCOFRADO EN MURO DE CONTENCION m5 REVOQUES, ENLUCIDOS Y MOLDURAS COLUMNAS RECTAS: TARRAJEO DE SUPERFICIES (Mezcla C:A 1:5, E=2cm) 0.00 TARRAJEO DE SUPERFICIE DE COLUMNETAS CON CEMENTO-ARENA m3 COSTO DIRECTO (S/.)

0.00 0.00 17.80

0.00

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.97

0.00

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

6.00

589.08

-

6.00

589.08

-

6.00

-589.08

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

-

0.00

0.00

0.00 0.00 21.80

0.00 0.00

98.18

0.00

0.00 0.00 25.70

0.00

-

243,654.94

0.00

0.00%

589.08

0.24%

589.08

0.24%

0.00

0.00%

GASTOS GENERALES

36,031.32

36,031.32

0.00

0.00%

87.11

0.24%

87.11

0.24%

35,944.21

99.76%

GASTOS DE SUPERVISION

12,054.15

12,054.15

0.00

0.00%

29.14

0.24%

29.14

0.24%

12,025.00

99.76%

GASTOS DE LIQUIDACION

1,901.53

1,901.53

0.00

0.00%

4.60

0.24%

4.60

0.24%

1,896.94

99.76%

GASTOS DE ELABORACION DE ET

2,347.23

2,347.23

0.00

0.00%

5.67

0.24%

5.67

0.24%

2,341.56

99.76%

52,334.23

0.00

0.00%

126.53

0.24%

126.53

0.24%

52,207.71

99.76%

295,989.17

0.00

0.00%

715.61

0.24%

715.61

0.24%

52,207.71

17.64%

COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA

VALORIZACION N° 01 MAYO 2011

ING. EDY FLORES SOSA

OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: Ing. FREDY MARCA HUANCA

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011 : MOQUEGUA : MARISCAL NIETO

RESUMEN DE VALORIZACIÓN AL MES DE MAYO DEL 2011 OBRA

: Mantenimiento de Losa Deportiva en la Junta Vecinal - Comité 07, del distrito de Samegua.

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

REGION PROVINCIA

FORMULA

:

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DEOBRA

: Ing. Freddy Huanca Marca

PARTIDA

DESCRIPCION

UND

PRESUPUESTO METRADOS

VALORIZACION DE EXPEDIENTE TECNICO COSTO DIRECTO (S/.) VALORIZACION MAYORES METRADOS COSTO DIRECTO (S/.) VALORIZACION DE PARTIDAS NUEVAS COSTO DIRECTO (S/.)

TOTAL % AVANCE FISICO ACTUAL A AGOSTO (S/.)

2,347.23

P.U

AVANCE ACUMULADO ANTERIOR PARCIAL

METRADO

MONTO

%

AVANCE MES ACTUAL METRADO

MONTO

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

%

SALDO ACTUAL METRADO

MONTO

%

243,654.94

115,060.00

47.22%

27,485.77

11.28%

142,545.77

58.50%

101,109.17

41.50%

243,654.94

0.00

0.00%

12,839.68

5.27%

12,839.68

5.27%

230,815.26

0.00%

243,654.94

0.00

0.00%

589.08

0.24%

589.08

0.24%

243,065.86

100.00%

243,654.94

115,060.00

47.22%

40,914.53

16.79%

155,974.53

64.01%

87,680.41

41.50%

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA ING. EDY FLORES SOSA

RESUMEN DE VALORIZACIÓN Nº 01 MES DE MAYO DEL 2011 OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

ENTIDAD EJECUTORA

: MUNICIPALIDAD DISTRITAL DE SAN CRISTOBAL

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: ING. FREDY MARCA HUANCA



DESCRIPCION

PRESUPUESTO ( S/. )

VALORIZACION ACUMULADO ANTERIOR

MES ACTUAL

ACUMULADO ACTUAL

SALDO ACTUAL

( S/. )

( S/. )

( S/. )

( S/. )

01.00.00

OBRAS Y TRABAJOS PROVISIONALES

13,549.94

13,094.06

455.88

13,549.94

02.00.00

OBRAS PRELIMINARES

26,970.79

14,234.16

5,998.76

20,232.92

03.00.00

IMPACTO AMBIENTAL

04.00.00

LOSA DEPORTIVA

05.00.00

CERCO PERIMETRICO

06.00.00

GRADERIAS Y AREAS VERDES

COSTO DIRECTO

(S/.)

COSTOS INDIRECTOS (S/.) COSTO TOTAL

(S/.)

900.00

300.00

300.00

600.00

9,126.27

0.00

0.00

0.00

149,159.60

77,855.07

20,731.13

98,586.19

43,948.32

9,576.72

0.00

9,576.72

243,654.94

115,060.00

27,485.77

142,545.77

39,472.10

18,639.72

4,452.69

23,092.41

283,127.04

133,699.72

31,938.46

165,638.18

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ 7 RESIDENTE DE OBRA ING. EDY FLORES SOSA

RESUMEN DE VALORIZACIÓN Nº 01 MES DE MAYO DEL 2011 OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

ENTIDAD EJECUTORA

: MUNICIPALIDAD DISTRITAL DE SAN CRISTOBAL

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DE OBRA

: ING. FREDY MARCA HUANCA



DESCRIPCION

PRESUPUESTO ( S/. )

RESIDENTE DE OBRA

VALORIZACION ACUMULADO ANTERIOR

MES ACTUAL

ACUMULADO ACTUAL

SALDO ACTUAL

( S/. )

( S/. )

( S/. )

( S/. )

INSPECTOR DE OBRA

l 31 DE MAYO 2011

QUEGUA

RISCAL NIETO

MEGUA

. FREDY MARCA HUANCA

SALDO ACTUAL ( S/. )

6,737.87 300.00 9,126.27 50,573.40 34,371.60

101,109.15 16,379.69 117,488.86

l 31 DE MAYO 2011

QUEGUA

RISCAL NIETO

MEGUA

. FREDY MARCA HUANCA

SALDO ACTUAL ( S/. )

S/.

2164156.01

+'05.'!B17

Mensual Acumulado 31,938.46 115,060.00 27,485.77 142,545.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Mensual Acumulado

142,545.77

27,485.77

115,060.00

3,000,000 2,900,000 2,800,000 2,700,000 2,600,000 2,500,000 2,400,000 2,300,000 2,200,000 2,100,000 2,000,000 1,900,000 1,800,000 1,700,000 1,600,000 1,500,000 1,400,000 1,300,000 1,200,000 1,100,000 1,000,000 900,000 800,000 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0

31,938.46

CUADRO COMPARATIVO MO OBRA: Mantenimiento de Losa Deportiva En la Junta Samegua-

MONTO VALORIZADO (S/.)

Anterior Mayo Junio Julio Agosto Setiembre

Anterior

Mayo

31,938.46 115,060.00

27,485.77 142,545.77

Acumulado

115,060.00

142,545.77

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CUADRO COMPARATIVO MONTO VS TIEMPO OBRA: Mantenimiento de Losa Deportiva En la Junta Vecinal Miraflores - Comite 07, Distrito de Samegua- Mariscal Nieto - Moquegua

Junio

Julio

Agosto

Setiembre

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00

0.00

PERIODO MENSUAL 2011

0.00

0.00

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ N° 7 RESIDENTE DE OBRA ING. EDY FLORES SOSA

VALORIZACIÓN Nº 01 MES DE MAYO 2011 OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

: OBRAS PRELIMINARES

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 17 DE MAYO DEL 2010

INSPECTOR DEOBRA

: ING FREDY FLORES SOSA

PARTIDA

DESCRIPCION

UND

PRESUPUESTO METRADOS

P.U

02.00.00 OBRAS PRELIMINARES

AVANCE ACUMULADO ANTERIOR PARCIAL

METRADO

AVANCE MES ACTUAL

MONTO

%

METRADO

MONTO

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

%

SALDO ACTUAL METRADO

MONTO

%

26,970.79

02.01.00

DESMONTAJE DE ARCOS DE FUTBOL

02.02.00

DEMOLICION MANUAL DE LOSA DE CONCRETO

02.03.00

DEMOLICION DE MUROS DE CONTENCION EXISTENTE

02.04.00

TRAZO, NIVELES Y REPLANTEO DURANTE LA OBRA

02.05.00

MOVILIZACION Y DESMOVILIZACION

Und. m2 m3 m2 glb

2.00

132.47

264.94

2.00

264.94

#########

0.00

0.00

0.00%

2.00

264.94

100.00%

0.00

0.00

160.00

17.73

2,836.80

160.00

2,836.80

#########

0.00

0.00

0.00%

160.00

2,836.80

100.00%

0.00

0.00

0.00%

52.50

230.10

12,080.25

33.17

7,632.42

63.18%

10.73

2,468.97 20.44%

43.90

10,101.39

83.62%

8.60

1,978.86

16.38%

720.00

1.79

1,288.80

0.00

0.00

0.00%

16.64

3.00

3,500.00

10,500.00

1.00

3,500.00

33.33%

1.00

COSTO DIRECTO (S/.)

29.79

0.00%

2.31%

16.64

29.79

2.31%

703.36

1,259.01

97.69%

3,500.00 33.33%

2.00

7,000.00

66.67%

1.00

3,500.00

33.33%

26,970.79

14,234.16

52.78%

5,998.76 22.24%

6,737.87

24.98%

2,427.37

2,427.37

1,281.07

52.78%

539.89 22.24%

1,820.96

75.02%

606.41

24.98%

GASTOS DE SUPERVISION

809.12

809.12

427.02

52.78%

179.96 22.24%

606.99

75.02%

202.14

24.98%

GASTOS DE LIQUIDACION

161.82

161.82

85.40

52.78%

35.99 22.24%

121.40

75.02%

40.43

24.98%

GASTOS GENERALES DE GESTION ADMINISTRATIVA

809.12

809.12

427.02

52.78%

179.96 22.24%

606.99

75.02%

202.14

24.98%

GASTOS GENERALES DE SEGURIDAD EN OBRA

161.82

161.82

85.40

52.78%

35.99 22.24%

121.40

75.02%

40.43

24.98%

4,369.27

2,305.93

52.78%

971.80 22.24%

3,277.73 75.02%

1,091.54

24.98%

31,340.06

16,540.09

52.78%

6,970.56 22.24%

23,510.65 75.02%

7,829.41

24.98%

GASTOS GENERALES

COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

INSPECTOR DE OBRA

20,232.92 75.02%

DESARROLLO DE LA CURVA "S" OBRA

:Mejoramiento de Canal y Construcción del Reservorio Choja, de la Localidad de Muylaque, Distrito de San Cristobal - Mariscal Nieto - Moque

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

ENTIDAD EJECUTORA

: MUNICIPALIDAD DISTRITAL DE SAN CRISTOBAL

FECHA DE INICIO DE OBRA INSPECTOR DE OBRA

: 17 DE MAYO DEL 2010 : ING. J. MIGUEL TICONA MAQUERA

AVANCE DEL PROYECTO

Performance del Tiempo - Curva "S" 110% Avance Prog.

100%

Avance Real

90%

Linear (Avance Real)

AVANCE (%)

80%

64.0%

70%

60.0%

60% 50%

45.0%

40% 30%

25.0%

20% 10%

2.5% 10.0%

0.0%

0.0%

0%

ANTERIOR

Presupuesto Proyectado (S/.) Presup. Actual Total (S/.) IC-Indice de Costo

Presupuesto Proyectado (S/.) Presup. Actual Total (S/.) IT-Indice de Tiempo

Indicadores de Costo IC=1 El Costo del Proyecto es el Programado 0.951.05 El Costo del Py tiene una variación considerable

JUNIO

JULIO ANTERIOR 28,312.70 31,938.46 1.13 MAYO 10.0% 2.5% 0.25

AGOSTO JUNIO 70,781.76 115,060.00 1.63 JUNIO 25.0% 64.0% 2.56

Indicadores del Tiempo IT=1 El Cronograma del Proyecto es el Programado 0.951.05 El Crong. tiene una variación considerable

COMENTARIOS SUPERVISOR - AVANCE DEL PROYECTO - ACCIONES A TOMAR

JULIO 127,407.17 0.00 0.00 JULIO 45.0% 0.0% 0.00

SOLICITUD DE CAMBIOS DEL PROYECTO

LECCIONES APRENDIDAS

SUPERVISOR

SUB GERENCIA DE SUPERVISION

Nombre:

Nombre:

Firma y Fecha :

Firma y Fecha

MEMORIA:

El usuario debera colocar en los casilleros donde indica estado, los calificativos de Muy Bueno, Bueno, Regular, Malo, Muy Malo

A CURVA "S"

rvorio Choja, istobal - Mariscal Nieto - Moquegua

Curva "S"

100.0% 80.0% 60.0%

AGOSTO

0.0% SETIEMBRE

0.0% OCTUBRE

AGOSTO 169,876.22 0.00 0.00

SETIEMBRE 226,501.63 0.00 0.00

OCTUBRE 283,127.04 0.00 0.00

AGOSTO 60.0% 0.0% 0.00

SETIEMBRE 80.0% 0.0% 0.00

OCTUBRE 100.0% 0.0% 0.00

HITOS FASE EJECUCION - MDT Inicio Proyectado 01-05-10 Real 17-05-10

Fin Proyectado Real

283,127.04

30-09-10 14-10-10

A DE SUPERVISION

no, Bueno, Regular, Malo, Muy Malo

ESTADO

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL MIRAFLORES-COMITÉ 7 RESIDENTE DE OBRA DE OBRA ING. FREDY MARCA SOSA

VALORIZACIÓN Nº 01 MES DE MAYO 2011 OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

: OBRAS Y TRABAJOS PROVICIONALES PROVISIONALES

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

INSPECTOR DEOBRA : ING. FREDY FLORES SOSA

PARTIDA

DESCRIPCION

UND

PRESUPUESTO METRADOS

P.U

01.00.00 OBRAS Y TRABAJOS PROVISIONALES 01.01.00

CERCO PROVISIONAL DE ESTERAS

01.02.00

CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.44

01.03.00

CASETA P/OFICINA RESIDENTE

01.04.00

LETRINA PROVISIONAL P/PERSONAL OBRERO

01.05.00

INSTALACION PROVISIONAL DE AGUA

01.06.00

INSTALACION PROVISIONAL DE ENERGIA ELECTRICA

01.07.00

ALMACEN Y CASETA DE GUARDIANIA

01.08.00

IMPLEMENTOS DE SEGURIDAD

AVANCE ACUMULADO ANTERIOR PARCIAL

METRADO

MONTO

%

AVANCE MES ACTUAL METRADO

MONTO

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

%

SALDO ACTUAL METRADO

MONTO

%

13,549.94

m Und. m2 glb glb glb m2 est.

100.00

17.73

1,773.00

100.00

1,773.00

100.00%

0.00

0.00

0.00%

100.00

1,773.00

100.00%

0.00

0.00

0.00%

1.00

957.81

957.81

1.00

957.81

100.00%

0.00

0.00

0.00%

1.00

957.81

100.00%

0.00

0.00

0.00%

24.00

155.49

3,731.76

24.00

3,731.76

100.00%

0.00

0.00

0.00%

24.00

3,731.76

100.00%

0.00

0.00

0.00%

1.00

243.57

243.57

1.00

243.57

100.00%

0.00

0.00

0.00%

1.00

243.57

100.00%

0.00

0.00

0.00%

1.00

455.88

455.88

1.00

455.88

100.00%

0.00

0.00

0.00%

1.00

455.88

100.00%

0.00

0.00

0.00%

1.00

455.88

455.88

0.00

0.00

0.00%

1.00

455.88

100.00%

1.00

455.88

100.00%

0.00

0.00

0.00%

36.00

25.89

932.04

36.00

932.04

100.00%

0.00

0.00

0.00%

36.00

932.04

100.00%

0.00

0.00

0.00%

1.00

5,000.00

5,000.00

1.00

5,000.00

100.00%

0.00

0.00

0.00%

1.00

5,000.00

100.00%

0.00

0.00

0.00%

COSTO DIRECTO (S/.)

13,549.94

13,094.06

96.64%

455.88

3.36%

0.00

0.00%

1,219.49

1,219.49

1,178.47

96.64%

41.03

3.36%

1,219.49

100.00%

0.00

0.00%

GASTOS DE SUPERVISION

406.50

406.50

392.82

96.64%

13.68

3.36%

406.50

100.00%

0.00

0.00%

GASTOS DE LIQUIDACION

81.30

81.30

78.56

96.64%

2.74

3.36%

81.30

100.00%

0.00

0.00%

406.50

406.50

392.82

96.64%

13.68

3.36%

406.50

100.00%

0.00

0.00%

81.30

81.30

78.56

96.64%

2.74

3.36%

81.30

100.00%

0.00

0.00%

2,195.09

2,121.24

96.64%

73.85

3.36%

2,195.09 100.00%

0.00

0.00%

15,745.03

15,215.30

96.64%

529.73

3.36%

15,745.03 100.00%

0.00

0.00%

GASTOS GENERALES

GASTOS GENERALES DE GESTION ADMINISTRATIVA GASTOS GENERALES DE SEGURIDAD EN OBRA COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

INSPECTOR DE OBRA

13,549.94 100.00%

SUSTENTACION DE METRADOS DE MOVIMIENTO DE TIERRAS FECHA

PARTIDA : OBRA

:

UBICACIÓN

Prog. 0+000 0+005 0+010 0+015 0+020 0+025 0+030 0+035 0+040 0+045 0+050 0+055 0+060

:

MEJORAMIENTO DE CANAL Y CONSTRUCCIÓN DE RESERVORIO CHOJA

PROPIETARIO

:

MUYLAQUE - MOQUEGUA

REALIZADO POR

:

corte base 1.00 1.20 1.20 1.50 1.30 1.50 1.50 1.30 2.10 1.20

Resumen Volumenes altura 1.30 1.60 1.20 1.70 1.60 3.50 5.00 2.00 1.50 1.30

Corte 4.80 3.60 6.38 5.20 13.13 18.75 6.50 7.88 3.90 0.00 0.00 0.00

Total Volumenes afectados por el coef

TRADOS DE MOVIMIENTO DE TIERRAS MAYO - 2010 MUNICIPALIDAD DIST. SAN CRISTOBAL BACH. ING. R.J.F.M.

70.13 Total Volumenes metrados Total Volumenes afectados por el coef. de esponjamiento = 30%

#REF! #REF! #REF!

#REF!

#REF! #REF! #REF!

SUSTENTACION DE METRADOS FECHA

PARTIDA : OBRA

:

UBICACIÓN

Prog. 0+205 0+210 0+215 0+220 0+225 0+230 0+235 0+240 0+245 0+250 0+255 0+260 0+265 0+270 0+275 0+280 0+285 0+290 0+295 0+300 0+305 0+310 0+315 0+320 0+325 0+330 0+335 0+340 0+345 0+350 0+355 0+360 0+365 0+370 0+375 0+380 0+385 0+390 0+395 0+400 0+405 0+410 0+415 0+420 0+425 0+430 0+435

:

MAYO - 2010

MEJORAMIENTO DE CANAL Y CONSTRUCCIÓN DE RESERVORIO CHOJA PROPIETARIO

:

MUNICIPALIDAD DIST. SAN CRISTOBAL

MUYLAQUE - MOQUEGUA

:

BACH. ING. R.J.F.M.

corte base

altura

REALIZADO POR

Area de corte 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Relleno Ancho Espesor

0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65

0.60 0.30 0.40 0.40 0.40 0.40 0.40 0.40 0.50 0.30 0.40 1.00 3.00 2.50 2.00 2.50 3.00 2.30 1.10

Area Relleno 0.00 0.00 0.00 0.39 0.20 0.26 0.26 0.26 0.26 0.26 0.26 0.33 0.20 0.26 0.65 1.95 1.63 1.30 1.63 1.95 1.50 0.72

Longitud

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

Muro seco altura

0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.80 0.90 1.20 3.50 2.80 2.10 2.65 3.15 2.50 1.40

0+440 0+445 0+450 0+455 0+460 0+465 0+470 0+475 0+480 0+485 0+490 0+495 0+500

0.00 0.00 0.00 0.00

#REF! #REF!

Total Volumenes metrados Volumenes afectados por el coef. de esponjamiento = 30%

ADOS

DIST. SAN CRISTOBAL

Muro seco espesor

0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60

Corte 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Resumen Volumenes excavacion Relleno #REF! #REF! #REF! #REF! 1.95 #REF! 0.98 #REF! 1.30 #REF! 1.30 #REF! 1.30 #REF! 1.30 #REF! 1.30 #REF! 1.30 #REF! 1.63 #REF! 0.98 #REF! 1.30 #REF! 3.25 #REF! 9.75 #REF! 8.13 #REF! 6.50 #REF! 8.13 #REF! 9.75 #REF! 7.48 #REF! 3.58 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00 #REF! 0.00

Muro seco 0.00 0.00 0.00 1.75 1.75 1.75 1.75 1.75 1.75 1.75 1.75 2.10 2.40 2.70 3.60 10.50 8.40 6.30 7.95 9.45 7.50 4.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

oef. de esponjamiento = 30%

0.00 0.00 0.00 0.00

0.00

#REF! #REF! #REF! #REF!

#REF! #REF! #REF!

0.00 0.00 0.00 0.00

71.18

0.00 0.00 0.00 0.00

79.10 79.10 102.83

FORMATO Nº 02 C.O. MUNICIPALIDAD DISTRITAL SAMEGUA

REPORTE DIARIO DE AVANCE DE OBRA OBRA: RESIDENTE:

FECHA:

SUP. / INSPEC.: Item

Prog

Descripción de Partida

MAESTRO DE OBRA

Unidad

CUADRILLA OP OF PE

Nº Veces

/

/

Metrado

Area

Largo

Ancho

Vº Bº

Altura

Total

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ N° 7

METRADO

RESIDENTE DE OBRA

DE

ACE RO

ING. EDY FLORES SOSA

SECTOR: ...........................................................

UBICACIÓN

Mayo de 2011

ELEMENTO DIA METRO

FORMA O TIPO

CALCULO LONGITUD PESO DE ACERO SEGUN DIAMETRO LONGITUD N° TOTAL 1/4 " 3/8 " 1/2" 5/8" 3/4" 1" 0.25 KG / M 0.58 KG / M 1.02 KG / M 1.60 KG / M 2.29 KG / M 4. 00 KG / M ELEMENTO

CALCULADO POR:

OBSERVA CIONES

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL MIRAFLORES-COMITÉ 7 RESIDENTE DE OBRA DE OBRA ING. FREDY MARCA SOSA

VALORIZACIÓN Nº 01 M OBRA

: Mantenimiento de Losa Deportiva en l

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

FORMULA

: IMPACTO AMBIENTAL

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2011

PARTIDA

DESCRIPCION

03.00.00 IMPACTO AMBIENTAL 03.01.00 MITIGACION DE IMPACTO AMBIENTAL

UND

glb

PRESUPUESTO METRADOS

3.00

COSTO DIRECTO (S/.) GASTOS GENERALES GASTOS DE SUPERVISION GASTOS DE LIQUIDACION GASTOS GENERALES DE GESTION ADMINISTRATIVA GASTOS GENERALES DE SEGURIDAD EN OBRA COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

81.00 27.00 5.40 27.00 5.40

VALORIZACIÓN Nº 01 MES DE MAYO 2011 MES DE REPORTE

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

REGION

: ADMINISTRACION DIRECTA

PROVINCIA

: IMPACTO AMBIENTAL

DISTRITO

: 04 DE MAYO DEL 2011

INSPECTOR DEOBRA

PRESUPUESTO P.U

AVANCE ACUMULADO ANTERIOR PARCIAL

METRADO

MONTO

%

AVANCE MES ACTUAL METRADO

MONTO

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

900.00 300.00

900.00

1.00

300.00

33.33%

1.00

300.00

33.33%

2.00

600.00

900.00

300.00

33.33%

300.00

33.33%

600.00

81.00

27.00

33.33%

27.00

33.33%

54.00

27.00

9.00

33.33%

9.00

33.33%

18.00

5.40

1.80

33.33%

1.80

33.33%

3.60

27.00

9.00

33.33%

9.00

33.33%

18.00

5.40

1.80

33.33%

1.80

33.33%

3.60

145.80

48.60 348.60

33.33% 33.33%

48.60 348.60

33.33% 33.33%

97.20 697.20

1,045.80

INSPECTOR DE OBRA

: 04 al 31 DE MAYO DEL 2011 : MOQUEGUA : MARISCAL NIETO : SAMEGUA : ING. FREDY FLORES SOSA AVANCE ACUMULADO ACTUAL %

66.67%

66.67% 66.67% 66.67% 66.67% 66.67% 66.67%

66.67% 66.67%

SALDO ACTUAL METRADO

1.00

MONTO

300.00

300.00 27.00 9.00 1.80 9.00 1.80 48.60 348.60

%

33.33%

33.33% 33.33% 33.33% 33.33% 33.33% 33.33%

33.33% 33.33%

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ N° 7 RESIDENTE DE OBRA ING. EDY FLORES SOSA

VALORIZACIÓN Nº 01 MES DE MAYO 2011 OBRA

: Mantenimiento de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

PROVINCIA

: MARISCAL NIETO

FORMULA

: LOSA DEPORTIVA

DISTRITO

: SAMEGUA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2010

INSPECTOR DEOBRA : ING FREDY FLORES SOSA

PARTIDA

04.00.00 04.01.00 04.01.01 04.01.02 04.01.03 04.01.04 04.01.05 04.02.00 04.02.01 04.02.02 04.02.03 04.03.00 04.03.01 04.04.00 04.04.01 04.04.02 04.04.03 04.04.04

DESCRIPCION

LOSA DEPORTIVA MOVIMIENTOS DE TIERRAS CORTE DE TERRENO NATURAL C/MAQUINARIA PERFILADO Y COMPACTADO EN LOSA DEPORTIVA BASE GRANULAR E=0.15m EXCAVACION MANUAL P/SARDINEL SUMERGIDO ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE OBRAS DE CONCRETO SIMPLE CONCRETO F'C=140KG/CM2 P/ SARDINEL SUMERGIDO CONCRETO F'C=140KG/CM2 PARA LOSA E=10CM ENCOFRADO Y DESENCOFRADO PARA LOSA PINTURA PINTURA ESMALTE DE LOSA CON FRANJA 0.05m OTROS CURADO DE SUPERFICIES HORIZONTALES JUNTAS RELLENAS CON ASFALTO PINTURA ARCO DE FULBITO INCLUYE TABLERO DE BASKET NET P/VOLEY INCL. PARANTES Y SOPORTE METALICO

UND

PRESUPUESTO METRADOS

AVANCE ACUMULADO ANTERIOR PARCIAL

METRADO

MONTO

AVANCE MES ACTUAL

%

METRADO

MONTO

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

%

SALDO ACTUAL METRADO

MONTO

9,126.27 5,290.60 m3 m2 m2 m3 m3

24.00

0.50

12.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

12.00

160.00

8.68

1,388.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

1,388.80

160.00

19.98

3,196.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

3,196.80

1.20

26.10

31.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.20

31.32

24.00

27.57

661.68

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

661.68

1.20

274.43

329.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.20

329.32

16.00

37.77

604.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

16.00

604.32

8.00

29.62

236.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

8.00

236.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

369.19

557.48

1,170.60 m3 m2 m2

557.48 ml

369.19

1.51

557.48

2,107.60 m2 ml est. est.

160.00

7.35

1,176.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

160.00

1,176.00

40.00

5.79

231.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

40.00

231.60

2.00

100.00

200.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

200.00

1.00

500.00

500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

COSTO DIRECTO (S/.) GASTOS GENERALES GASTOS DE SUPERVISION GASTOS DE LIQUIDACION GASTOS GENERALES DE GESTION ADMINISTRATIVA GASTOS GENERALES DE SEGURIDAD EN OBRA COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

P.U

9,126.27

0.00

0.00%

0.00

0.00%

0.00

0.00%

821.36

821.36

0.00

0.00%

0.00

0.00%

0.00

0.00%

273.79

273.79

0.00

0.00%

0.00

0.00%

0.00

0.00%

54.76

54.76

0.00

0.00%

0.00

0.00%

0.00

0.00%

273.79

273.79

0.00

0.00%

0.00

0.00%

0.00

0.00%

54.76

54.76

0.00

0.00%

0.00

0.00%

0.00

0.00%

1,478.46

0.00 0.00

0.00% 0.00%

0.00 0.00

0.00% 0.00%

0.00 0.00

0.00% 0.00%

10,604.73

500.00

9,126.27 821.36 273.79 54.76 273.79 54.76 1,478.46 10,604.73

RESIDENTE DE OBRA

INSPECTOR DE OBRA

DEL 2011

ES SOSA

SALDO ACTUAL %

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

100.00% 100.00%

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ N° 7 RESIDENTE DE OBRA ING. EDY FLORES SOSA

VALORIZACIÓN Nº 01 MES OBRA

: Mantenimiento de Losa Deportiva en la junta Vecina

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

FORMULA

: LOSA DEPORTIVA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2010

PARTIDA

05.00.00 05.01.00 05.01.01 05.01.02 05.01.03 05.01.04 05.01.05 05.02.00 05.02.01 05.02.02 05.02.03 05.03.00 05.03.01 05.03.02 05.03.03 05.03.04 05.03.05 05.03.06 05.03.07 05.03.08 05.04.00 05.04.01 05.04.02 05.04.03 05.04.04 05.04.05 05.05.00 05.05.01 05.05.02 05.05.03 05.05.04 05.05.05 05.06.00 05.06.01 05.06.02 05.06.03

DESCRIPCION

CERCO PERIMETRICO MOVIMIENTOS DE TIERRAS CORTE O EXCAVACION EN MATERIAL SUELTO MANUAL EXCAVACION DE ZANJAS PARA ZAPATAS MANUAL ACARREO DE MATERIAL EXCEDENTE HASTA 30m RELLENO CON MATERIAL PRESTAMO SELECCIONADO ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ 10m3 OBRAS DE CONCRETO SIMPLE SOLADO PARA ZAPATAS E=2" 1:12 (C:H) SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO H= 0.40m SOBRECIMIENTOS CONCRETO 1:8 + 25% P.M. OBRAS DE CONCRETO ARMADO CONCRETO F'C=210KG/CM2 ZAPATAS ACERO FY= 4200KG/CM2 EN ZAPATAS ENCOFRADO Y DESENCOFRADO EN MUROS REFORZADOS CARAVISTA CONCRETO F'C=210KG/CM2 MUROS DE CONCRETO ACERO FY= 4200KG/CM2 MUROS ENCOFRADO Y DESENCOFRADO EN COLUMNAS CONCRETO F'C=210KG/CM2 COLUMNAS ACERO FY= 4200KG/CM2 CARPINTERIA METALICA REPARACION PUERTA METALICA SECUNDARIA SEGÚN DISEÑO CERCO METALICO MODULOS SEGÚN DISEÑO TIPO I CERCO METALICO MODULOS SEGÚN DISEÑO TIPO II PUERTA METALICA TIPO 1 SEGÚN DETALLE PINTURA ANTICORROSIVA P/CARP. MET. PINTURA PINTURA ESMALTE EN COLUMNAS PINTURA ESMALTE EN MUROS DE CONTENCION PINTURA ESMALTE EN GRADERIAS PINTURA ESMALTE EN SOBRECIMIENTOS PINTURA ESMALTE EN CARPINTERIA METALICA OTROS ENSAYO DE SUELO ENSAYO DE COMPACTACION PRUEBA DE CALIDAD

UND

PRESUPUESTO METRADOS

P.U

m3 m3 m3 m3 m3

358.00

0.50

40.00

30.41

40.00

17.40

250.00

77.91

398.00

23.57

m2 m2 m3

80.00

28.69

m3 KG m2 m3 KG m2 m3 KG m2 Und. Und. m2 m2 m2 m2 m2 m2 m2 glb glb Und.

28.00

52.32

2.10

263.71

2.50

446.14

50.00

7.23

225.00

99.52

76.88

447.11

1,977.94

7.23

39.90

56.44

2.21

460.78

742.80

7.23

2.50

116.76

10.00

550.48

22.00

550.48

9.60

425.97

219.43

5.02

39.90

18.78

112.50

18.78

67.20

18.78

33.25

18.39

219.43

9.54

2.00

150.00

5.00

25.00

10.00

25.00

05.06.04 05.06.05 05.06.06 05.06.07

JUNTAS DE CONSTRUCCION CON TECKNOPORT CURADO DE SUPERFICIES VERTICALES SOLAQUEADO DE OBRAS DE CONCRETO ARMADO IMPERMEABILIZACION DE MUROS CON ASFALTO

ml m2 m2 m2

27.00 112.50

0.51

112.50

11.34

112.50

6.07

COSTO DIRECTO (S/.) GASTOS GENERALES GASTOS DE SUPERVISION GASTOS DE LIQUIDACION GASTOS GENERALES DE GESTION ADMINISTRATIVA GASTOS GENERALES DE SEGURIDAD EN OBRA COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

3.48

13,424.36 4,474.79 894.96 4,474.79 894.96

LORIZACIÓN Nº 01 MES DE MAYO 2011

de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

PRESUPUESTO

AVANCE ACUMULADO ANTERIOR PARCIAL

METRADO

MONTO

%

AVANCE MES ACTUAL METRADO

MONTO

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

PROVINCIA

: MARISCAL NIETO

DISTRITO

: SAMEGUA

INSPECTOR DEOBRA

: ING FREDY MARCA SOSA

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

%

SALDO ACTUAL METRADO

149,159.60 30,949.76 179.00

211.83

105.92

59.17%

36.30

18.15

10.14%

248.13

124.07

69.31%

109.87

1,216.40

26.33

800.70

65.83%

13.67

415.70

34.18%

40.00

1,216.40

100.00%

0.00

696.00

29.15

507.21

72.88%

10.85

188.79

27.13%

40.00

696.00

100.00%

0.00

19,477.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

250.00

9,380.86

90.00

2,121.30

22.61%

0.00

0.00

0.00%

90.00

2,121.30

22.61%

308.00

4,313.95 2,295.20

64.65

1,854.81

80.81%

15.35

440.39

19.19%

80.00

2,295.20

100.00%

0.00

1,464.96

20.67

1,081.45

73.82%

0.00

0.00

0.00%

20.67

1,081.45

73.82%

7.33

553.79

1.03

271.62

49.05%

0.00

0.00

0.00%

1.03

271.62

49.05%

1.07

1,115.35

1.50

669.21

60.00%

0.00

0.00

0.00%

1.50

669.21

60.00%

1.00

361.50

25.62

185.23

51.24%

0.00

0.00

0.00%

25.62

185.23

51.24%

24.38

22,392.00

170.31

16,949.25

75.69%

54.69

5,442.75

24.31%

225.00

22,392.00

100.00%

0.00

34,373.82

59.08

26,415.26

76.85%

17.47

7,811.01

22.72%

76.55

34,226.27

99.57%

0.33

14,300.51

1,180.01

8,531.47

59.66%

797.93

5,769.03

40.34%

1,977.94

14,300.51

100.00%

0.00

2,251.96

31.00

1,749.64

77.69%

0.00

0.00

0.00%

31.00

1,749.64

77.69%

8.90

1,018.32

1.69

778.72

76.47%

0.00

0.00

0.00%

1.69

778.72

76.47%

0.52

5,370.44

380.74

2,752.75

51.26%

0.00

0.00

0.00%

380.74

2,752.75

51.26%

362.06

81,183.90

23,098.11 291.90

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.50

5,504.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

12,110.56

22.00

12,110.56

100.00%

0.00

0.00

0.00%

22.00

12,110.56

100.00%

0.00

4,089.31

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

9.60

1,101.54

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

219.43

6,828.92 749.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

39.90

2,112.75

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

112.50

1,262.02

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

67.20

611.47

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

33.25

2,093.36

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

219.43

300.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

125.00

0.00

0.00

0.00%

1.00

25.00

20.00%

1.00

25.00

20.00%

4.00

250.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

2,784.96

93.96

11.20

38.98

41.48%

0.00

0.00

0.00%

11.20

38.98

41.48%

15.80

57.38

35.46

18.08

31.52%

0.00

0.00

0.00%

35.46

18.08

31.52%

77.04

1,275.75

35.46

402.12

31.52%

54.70

620.30

48.62%

90.16

1,022.41

80.14%

22.34

682.88

84.15

510.79

74.80%

0.00

0.00

0.00%

84.15

510.79

74.80%

28.35

149,159.60

77,855.07

52.20%

20,731.13 13.90%

13,424.36

7,006.96

52.20%

1,865.80 13.90%

8,872.76

66.09%

4,474.79

2,335.65

52.20%

621.93 13.90%

2,957.59

66.09%

894.96

467.13

52.20%

124.39 13.90%

591.52

66.09%

4,474.79

2,335.65

52.20%

621.93 13.90%

2,957.59

66.09%

591.52

66.09%

894.96

467.13

52.20%

124.39 13.90%

24,163.85

12,612.52 90,467.59

52.20% 52.20%

3,358.44 13.90% 24,089.57 13.90%

173,323.45

INSPECTOR DE OBRA

98,586.19 66.09%

15,970.96 66.09% 114,557.16 66.09%

31 DE MAYO DEL 2011

UEGUA

SCAL NIETO

GUA

REDY MARCA SOSA SALDO ACTUAL MONTO

%

54.94

30.69%

0.00

0.00%

0.00

0.00%

19,477.50

100.00%

7,259.56

77.39%

0.00

0.00%

383.51

26.18%

282.17

50.95%

446.14

40.00%

176.27

48.76%

0.00

0.00%

147.55

0.43%

0.00

0.00%

502.32

22.31%

239.61

23.53%

2,617.69

48.74%

291.90

100.00%

5,504.80

100.00%

0.00

0.00%

4,089.31

100.00%

1,101.54

100.00%

749.32

100.00%

2,112.75

100.00%

1,262.02

100.00%

611.47

100.00%

2,093.36

100.00%

300.00

100.00%

100.00

80.00%

250.00

100.00%

54.98

58.52%

39.29

68.48%

253.34

19.86%

172.08

25.20%

50,573.40 33.91% 4,551.61 33.91% 1,517.20 33.91% 303.44 33.91% 1,517.20 33.91% 303.44 33.91% 8,192.89 33.91% 58,766.29 33.91%

MUNICIPALIDAD DISTRITAL DE SAMEGUA JUNTA VECINAL COMITÉ N° 7 RESIDENTE DE OBRA ING. EDY FLORES SOSA

OBRA

VALORIZACIÓN Nº 01 M

: Mantenimiento de Losa Deportiva en la junt

MODALIDAD DE EJECUCION

: ADMINISTRACION DIRECTA

FORMULA

: LOSA DEPORTIVA

FECHA DE INICIO DE OBRA

: 04 DE MAYO DEL 2010

PARTIDA

06.00.00 06.01.00 06.01.01 06.01.02 06.01.03 06.01.04 06.02.00 06.02.01 06.03.00 06.03.01 06.03.02 06.03.03 06.04.00 06.04.01 06.04.02 06.04.03 06.04.04 06.04.05 06.04.06 06.04.07 06.05.00 06.05.01 06.05.02 06.06.00 06.06.01 06.06.02 06.06.03 06.06.04 06.06.05 06.06.06 06.06.07 06.06.08 06.06.09 06.06.10

DESCRIPCION

GRADERIAS Y AREAS VERDES MOVIMIENTO DE TIERRA CORTE O EXCAVACION MANUAL EN TERRENO NATURAL RELLENO CON MATERIAL PROPIO C/EQUIPO ACARREO DE MATERIAL EXCEDENTE HASTA 30M ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE OBRAS DE CONCRETO SIMPLE CONCRETO 1:10 + 30% P.G. P/CIMIENTO OBRAS DE CONCRETO ARMADO CONCRETO F'C=175KG/CM2 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CARAVISTA ACERO FY=4200KG/CM2 INSTALACIONES SANITARIAS EMPALME DE TUBERIA A RED EXISTENTE DE PVC 4" C/ABRAZADERA DE 4" A 3/4" CAJA CONCRETO 0.60X0.60X0.40M CAJA DE CONCRETO P/MEDIDOR EXCAVACION DE ZANJAS MANUAL P/AGUA RELLENO CON MATERIAL PROPIO SELECCIONADO Y COMPACTADO TUBERIA PVC SAP 3/4" VALVULA COMPUERTA DE BRONCE DE 3/4" PINTURA PINTURA ESMALTE EN SARDINELES PINTURA CON BREA EN JARDINERIAS OTROS JUNTAS RELLENAS CON ASFALTO CAPSULAS PARA BASURERO SEGÚN DISEÑO PREPARACION DE TERRENO P/JARDINERIA SIEMBRA DE GRASS SUMINISTRO E INSTALACION DE FLORES/ARBOLES JARDINERIAS PARA INS/ARBOLES ESTRUCTURA METALICA EN GRADERIA SEGÚN DISEÑO SUMINISTRO E INSTALACION DE POSTES C/REFLECTOR ILUMINACION DE CANCHA REHUBICACION DE POSTES DE CONCRETO

UND

PRESUPUESTO METRADOS

m3 m3 m3 m3

38.82

30.41

4.00

41.35

38.82

17.40

29.95

27.57

m3

28.82

193.94

m3 m2 kg

6.43

389.75

55.20

67.89

213.23

7.23

1.00

78.83

2.00

95.82

1.00

84.66

6.00

30.41

5.04

41.91

15.00

10.52

1.00

59.74

75.90

9.96

27.60

8.49

Und. Und. Und. m3 m3 ml Und. m2 m2 ml Und. m2 m2 Und. Und. glb Und. glb Und.

8.00

5.79

2.00

220.65

77.50

22.12

15.50

4.35

10.00

39.06

10.00

60.00

1.00

10,000.00

4.00

1,500.00

1.00

5,000.00

2.00

750.00

COSTO DIRECTO (S/.) GASTOS GENERALES

P.U

3,955.35

GASTOS DE SUPERVISION GASTOS DE LIQUIDACION GASTOS GENERALES DE GESTION ADMINISTRATIVA GASTOS GENERALES DE SEGURIDAD EN OBRA COSTOS INDIRECTOS (S/.)

COSTO TOTAL (S/.)

RESIDENTE DE OBRA

1,318.45 263.69 1,318.45 263.69

ORIZACIÓN Nº 01 MES DE MAYO 2011

de Losa Deportiva en la junta Vecinal Miralores, Comité 7 del Distrito de Samegua

PRESUPUESTO

AVANCE ACUMULADO ANTERIOR PARCIAL

METRADO

MONTO

%

AVANCE MES ACTUAL METRADO

MONTO

MES DE REPORTE

: 04 al 31 DE MAYO DEL 2011

REGION

: MOQUEGUA

PROVINCIA

: MARISCAL NIETO

DISTRITO

: SAMEGUA

INSPECTOR DEOBRA

: ING FREDY MARCA SOSA

AVANCE ACUMULADO ACTUAL %

METRADO

MONTO

%

SALDO ACTUAL METRADO

43,948.32 2,847.11 1,180.52

5.98

181.85

15.40%

0.00

0.00

0.00%

5.98

181.85

15.40%

32.84

165.40

4.00

165.40

100.00%

0.00

0.00

0.00%

4.00

165.40

100.00%

0.00

675.47

7.78

135.37

20.04%

0.00

0.00

0.00%

7.78

135.37

20.04%

31.04

825.72

7.80

215.05

26.04%

0.00

0.00

0.00%

7.80

215.05

26.04%

22.15

5.98

1,159.76

20.75%

0.00

0.00

0.00%

5.98

1,159.76

20.75%

22.84

2,506.09

6.43

2,506.09

100.00%

0.00

0.00

0.00%

6.43

2,506.09

100.00%

0.00

3,747.53

55.20

3,747.53

100.00%

0.00

0.00

0.00%

55.20

3,747.53

100.00%

0.00

1,541.65

202.72

1,465.67

95.07%

0.00

0.00

0.00%

202.72

1,465.67

95.07%

10.51

5,589.35 5,589.35

7,795.27

966.36 78.83

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

191.64

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

84.66

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

182.46

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

211.23

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

5.04

157.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.00

59.74

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

990.29 755.96

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

75.90

234.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

27.60

25,759.95 46.32

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

8.00

441.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

1,714.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

77.50

67.43

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

15.50

390.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

600.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

10,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

6,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

4.00

5,000.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

1,500.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

43,948.32

9,576.72

21.79%

0.00

0.00%

9,576.72

21.79%

3,955.35

861.90

21.79%

0.00

0.00%

861.90

21.79%

1,318.45

287.30

21.79%

0.00

0.00%

287.30

21.79%

263.69

57.46

21.79%

0.00

0.00%

57.46

21.79%

1,318.45

287.30

21.79%

0.00

0.00%

287.30

21.79%

263.69

57.46

21.79%

0.00

0.00%

57.46

21.79%

7,119.63

1,551.43 11,128.15

21.79% 21.79%

0.00 0.00

0.00% 0.00%

1,551.43 11,128.15

21.79% 21.79%

51,067.95

INSPECTOR DE OBRA

1 DE MAYO DEL 2011

EGUA

CAL NIETO

GUA

REDY MARCA SOSA SALDO ACTUAL MONTO

%

998.66

84.60%

0.00

0.00%

540.10

79.96%

610.68

73.96%

4,429.59

79.25%

0.00

0.00%

0.00

0.00%

75.99

4.93%

78.83

100.00%

191.64

100.00%

84.66

100.00%

182.46

100.00%

211.23

100.00%

157.80

100.00%

59.74

100.00%

755.96

100.00%

234.32

100.00%

46.32

100.00%

441.30

100.00%

1,714.30

100.00%

67.43

100.00%

390.60

100.00%

600.00

100.00%

10,000.00

100.00%

6,000.00

100.00%

5,000.00

100.00%

1,500.00

100.00%

34,371.60 3,093.44

78.21% 78.21%

1,031.15 206.23 1,031.15 206.23 5,568.20 39,939.80

78.21% 78.21% 78.21% 78.21%

78.21% 78.21%

Related Documents

Valorizacion Mayo
January 2021 2
Valorizacion Final
January 2021 2
Mayo 2017
January 2021 2
Mayo 2018
January 2021 1

More Documents from "Bouz V's"

Valorizacion Mayo
January 2021 2
January 2021 3
Informe Del Problema 4
February 2021 1
Complete Pump
February 2021 1