DESIGN AND CONSTRUCTION OF ROADS BRIDGES, CULVERTS, SIDEWALKS, PHE & ASSOCIATED CIVIL PROJECT: WORKS ON TENDER SURE CONCEPTS FOR ABD AREA UNDER NAGPUR SMART CITY PROJECT PROJECT:

HYDRAULIC DESIGN OF MJBR-07 MC-18C AT CH. 0+835

DOCUMENT NO.

DATE

SHEET

CONTENT Sr. No.

Item Description

Page No.

1)

Catchment Area

i)

Toposheet Image

2)

L - Section

2 to 3

3)

Cross Section

4 to 5

4)

Hydraulic Calculation

i)

Data

6

ii)

Discharge calculation by Ingli's Formula

6

iii)

Discharge calculation by Dicken's Formula

6

iv)

Discharge calculation by Rational Method

6

v)

Design Discharge

6

vi)

Calculated HFL at Defined Section at Bridge Site

7

vii)

Manning Discharge

viii)

Calculation for linear waterway at HFL

10

ix)

Afflux Calculation

11

5)

Summary

12

6)

Drawing

13 to 14

1

7 to 9

1) L - SECTION LEVELS Calculation for Hydraulic Gradient S Chainage

Levels

U/S

Difference in

Chain age

Bed Level (m)

(m)

(m)

300

277.340

1

300

277.340

0

277.500

-0.160

270

277.220

2

270

277.220

-30

277.490

-0.270

240

277.270

3

240

277.270

-60

277.280

-0.010

210

277.320

4

210

277.320

-90

277.290

0.030

180

277.380

5

180

277.380

-120

277.270

0.110

150

277.450

6

150

277.450

-150

277.260

0.190

120

277.490

7

120

277.490

-180

277.190

0.300

90

277.520

8

90

277.520

-210

276.940

0.580

60

277.550

9

60

277.550

-240

276.900

0.650

10

30

277.530

-270

276.780

0.750

11

0

277.500

-300

276.710

0.790

Total

=

2.960

=

0.269

=

1115

in

1115

30

277.530

0.0

277.500

-30

277.490

-60

277.280

-90

277.290

-120

277.270

-150

277.260

-180

277.190

-210

276.940

-240

276.900

-270

276.780

-300

276.710

U/S levels

Location of Box culvert

D/S levels

Chain age

Bed Level (m)

D/S

Sr. no.

Total

Average Difference =

Bed Level

No. of Chain age Hydraulic Gradient Bed Slope

=

1

D/S

L- SECTION FOR NALLAH

U/S

280.000 279.000

LEVELS

278.000 277.000 276.000 275.000 274.000 273.000 -300

-270

-240

-210

-180

-150

-120

-90

At 0 m Chainage - Bridge Location. -60

-30

0

30

CHAINAGE

60

90

120

150

180

210

240

270

300

2) Cross section ion at at90m 150 m D/S D/S side SIDE Road Top Level Top of Box Bed Level at 90 m D/S HFL at proposed bridge HFL at 90 m D/S

= = = = =

281.700 281.548 277.280 282.300 282.219

Bed Level

HFL

Road Top Level

-34 -32

(m) 279.700 279.800

(m) 282.219 282.219

(m) 281.700 281.700

-30

279.800

282.219

281.700

-28

279.900

282.219

281.700

-26

279.800

282.219

281.700

-24

279.900

282.219

281.700

-22

279.900

282.219

281.700

-20

279.500

282.219

281.700

-18

279.500

282.219

281.700

-16

279.400

282.219

281.700

-14

278.800

282.219

281.700

-12

278.100

282.219

281.700

-10

277.400

282.219

281.700

-8

277.000

282.219

281.700

-6

277.100

282.219

281.700

-4

277.200

282.219

281.700

-2

277.200

282.219

281.700

0

277.280

282.219

281.700

2

277.300

282.219

281.700

4

277.300

282.219

281.700

6

277.300

282.219

281.700

Chainage

8

277.300

282.219

281.700

10

277.300

282.219

281.700

12

277.300

282.219

281.700

14

277.300

282.219

281.700

16

278.500

282.219

281.700

18

279.700

282.219

281.700

20

280.600

282.219

281.700

22

280.400

282.219

281.700

24

280.300

282.219

281.700

26

280.600

282.219

281.700

28

280.600

282.219

281.700

30

280.600

282.219

281.700

32

280.700

282.219

281.700

280.700

282.219

281.700

34

PAGE NO.7

m m m m m

CROSS SECTION OF NALLAH AT 90 m D/S 286.00 284.00

LEVELS

282.00 Formation level HFL

280.00 278.00

PROFILE

276.00 274.00 272.00 -34 -30 -26 -22 -18 -14 -10

-6

-2

2

CHAINAGE

PAGE NO.8

6

10

14

18

22

26

30

34

3) Hydraulic Calculations Catchment Area

=

No. of Span

=

25.90 Km2 5 no. 9.32 m

Span Length

=

Location of Defined Section

=

LBL at Proposed section

=

277.500 m

LBL at 90D/S

=

277.280 m

90 D/S

(As per Clause. 4.4 IRC:SP:13-2004)

3.1) Discharge calculation by Ingli's Formula = Q 125 x M (M+ 10) =

125x25.901 (25.901+10)

Q

=

540.35

m3/sec (As per Clause. 4.2 IRC:SP:13-2004)

3.2) Discharge calculation by Dicken's Formula Q

=

C

=

Q

= =

CM

3/4

14.0 14x(25.901)^3/4 160.74 m3/sec (As per Clause. 4.7.9 IRC:SP:13-2004)

3.3) Discharge calculation by Rational Method Q

=

0.028 P f A lc

=

Discharge in Cum/sec

=

% Co-efficient of runoff for the catchment characteristics

=

0.8

Where, Q P A

=

Area of Catchment in Ha.

f

= = =

2590.1 Fraction 0.910

Ic Q

Ha.

=

Critical intensity of rainfall in cm per hr.

=

1.593

= =

0.028 x 0.8 x 2590.1 x 0.91 x 1.593 m3/sec 84.105

cm/hr

So Final designed discharge

=

540.35

m3/sec

The HFL as per local inquiry and Discharge is calculated By Manning's Formula Calculation for Hydraulic Gradient Slope

=

1 in

1115

Hydraulic Gradient 1 in 1115

Calculated HFL at Defined

=

282.219

m

Compartment I Wetted

Diff. In GL.

Wetted

Chainage

GL.

Depth of water

1

2

3

-34

279.700

2.519

-32

279.800

2.419

2.469

2.00

4.939

0.100

2.002

-30

279.800

2.419

2.419

2.00

4.839

0.000

2.000

-28

279.900

2.319

2.369

2.00

4.739

0.100

2.002

-26

279.800

2.419

2.369

2.00

4.739

0.100

2.002

-24

279.900

2.319

2.369

2.00

4.739

0.100

2.002

-22

279.900

2.319

2.319

2.00

4.639

0.000

2.000

-20

279.500

2.719

2.519

2.00

5.039

0.400

2.040

-18

279.500

2.719

2.719

2.00

5.439

0.000

2.000

-16

279.400

2.819

2.769

2.00

5.539

0.100

2.002

-14

278.800

3.419

3.119

2.00

6.239

0.600

2.088

A1 =

50.89

P1 =

20.14

Mean depth

Length

4

5

6

7

8

118.020

Area

perimeter

Compartment I H.F.L Compartment

282.220 m

I

II

III

Rugosity coefficients

(n)

0.035

Wetted area (m2)

(A)

50.885

50.89

Wetted perimeter (m)

(P)

20.140

20.14

Hydraulic Mean Depth

( R)

2.527

Bed Slope

(S)

0.0009

Velocity =

R 2/3 x S 1/2

1.587

1.59

80.77

80.77

n Discharge (m3/sec)

(Q)

Manning's Discharge at HFL 282.22 m

=

80.77

m3/sec

Compartment II Chainage

GL.

Depth of water

1

2

3

4

5

6

7

8

-12

278.100

4.119

3.769

2.00

7.539

0.700

2.119

-10

277.400

4.819

4.469

2.00

8.939

0.700

2.119

-8

277.000

5.219

5.019

2.00

10.039

0.400

2.040

-6

277.100

5.119

5.169

2.00

10.339

0.100

2.002

-4

277.200

5.019

5.069

2.00

10.139

0.100

2.002

-2

277.200

5.019

5.019

2.00

10.039

0.000

2.000

0

277.280

4.939

4.979

2.00

9.959

0.080

2.002

2

277.300

4.919

4.929

2.00

9.859

0.020

2.000

Mean depth

Length

Wetted

Diff. In GL.

Area

Wetted perimeter

4

277.300

4.919

4.919

2.00

9.839

0.000

2.000

6

277.300

4.919

4.919

2.00

9.839

0.000

2.000

8

277.300

4.919

4.919

2.00

9.839

0.000

2.000

10

277.300

4.919

4.919

2.00

9.839

0.000

2.000

12

277.300

4.919

4.919

2.00

9.839

0.000

2.000

14

277.300

4.919

4.919

2.00

9.839

0.000

2.000

16

278.500

3.719

4.319

2.00

8.639

1.200

2.332

A1 =

144.52

P1 =

30.62

75.409

Compartment II H.F.L

282.220 m

Rugosity coefficients

(n)

0.030

Wetted area (m2)

(A)

144.518

144.52

Wetted perimeter (m)

(P)

30.617

30.62

Hydraulic Mean Depth

( R)

4.720

Bed Slope

(S)

0.0009

Velocity =

R 2/3 x S 1/2

2.809

2.81

405.98

405.98

n Discharge (m3/sec)

(Q)

Manning's Discharge at HFL 282.22 m

=

405.98

m3/sec

Compartment III Chainage

GL.

Depth of water

Mean depth

Length

1

2

3

4

5

6

7

8

18

279.700

2.519

3.119

2.00

6.239

1.200

2.332

20

280.600

1.619

2.069

2.00

4.139

0.900

2.193

22

280.400

1.819

1.719

2.00

3.439

0.200

2.010

24

280.300

1.919

1.869

2.00

3.739

0.100

2.002

26

280.600

1.619

1.769

2.00

3.539

0.300

2.022

28

280.600

1.619

1.619

2.00

3.239

0.000

2.000

30

280.600

1.619

1.619

2.00

3.239

0.000

2.000

32

280.700

1.519

1.569

2.00

3.139

0.100

2.002

34

280.700

1.519

1.519

2.00

3.039

0.000

2.000

A1 =

33.75

P1 =

18.56

316.024

Compartment III H.F.L

282.220 m

Wetted

Diff. In GL.

Area

Wetted perimeter

Rugosity coefficients

(n)

0.035

Wetted area (m2)

(A)

33.747

33.75

Wetted perimeter (m)

(P)

18.563

18.56

Hydraulic Mean Depth

( R)

1.818

Bed Slope

(S)

0.0009

R 2/3 x S 1/2

Velocity =

1.275

1.27

43.01

43.01

n Discharge (m3/sec)

(Q)

Manning's Discharge at HFL 282.22 m

=

43.01

m3/sec

Total Manning's Discharge Calculated as Above

=

529.76

m3/sec

% increase over inglis discharge

1.96

%

3.4) Calculation for linear waterway at HFL @ 90D/S Tallied HFL

=

282.220

m

LBL

=

277.500

m

Max. flood depth

D

=

4.720

m

Wetted area at HFL

A

=

229.15

m2

Linear waterway (L)

A/D

=

48.55

m

It is Proposed to Provide

=

5

Linear waterway is proposed

=

49.00

m

Width of inner wall

=

0.60

m

Width of end wall

=

0.70

m

No. of Wall

=

6

Linear waterway at site

=

46.60

Hence Ok

spans of

9.32

m

Nos. m

3.5) Calculation for Determination of Formation level at Defind D/S Side section Sr.No.

At Defined D/S

Particulars

1)

HFL

2)

Afflux maximum

-

0.182 m

3)

Clearance

-

1.200 m

4)

Soffit Level

-

283.682 m

5)

Top Slab Thickness

-

0.700 m

6)

Wearing Coat

-

0.065 m

7)

Top of Box

-

284.447 m

8)

Formation Level at defined c/s

-

281.700 m

Clearance

=

282.219 m

At Prop. section

1.200

m

3.6) Calculation for Scour Level Mean scour Depth

0.3 Db2

282.300 m

<

280.848 m

NOT OK

<

281.548 m

NOT OK

As per IRC: 5 -2015 Clause. 106.8.2 (page no.24)

dsm

=

1.34

x

As per IRC: 5 -2015 Clause 106.9.3.1

------

(page no.25)

Ksf Where, Db

=

Designed discharge in m3/s per meter width

dsm

=

Normal scour depth in m

Ksf

=

Silt factor for material obtain upto deepest anticipated scour As per IRC: 5 -2015 Clause 106.9.3.1 2.45 (Silt factor ) (page no.25)

Db

=

3 702.4524 m /sec As per IRC: 5 -2015 Clause 106.9.3.1

=

30% increased design Discharge is 702.45

(page no.25)

46.60 = dsm

=

15.07 m 1.34 x ((15.07^2)/2.45)^0.33

As per IRC: 5 -2015 Clause 106.9.3.1

6.06 m

(page no.25)

Scour Level

Bottom of Cut-off Wall

Outer Wall

=

276.235 m

>

274.200 m

Hence Ok

Inner Wall

=

276.235 m

>

274.200 m

Hence Ok

HFL

=

282.300 m

RTL

=

281.700 m

LBL Raft Top

=

277.5

=

277.2

1.265 Scour Level

=

276.235 m 3.0

Bottom of Cut-off Wall

=

274.2

The Span Arrangement of Bridge is as shown Above RTL

=

281.700 m

Top of Box

=

281.548 m

Soffit

=

280.848 m

H.F.L. at proposed section

=

281.700 m

L.B.L. at proposed section

=

277.500 m

Total discharge

=

529.764 cumec

3.7) Afflux Calculation by Molesworth's formula

Afflux

=

V2

+ 0.015

{ ( A / A1 )2 - 1 }

As per IRC: 5 -2015 Clause 106.6.2

17.88

(page no.23) Where, Mean Velocity

V

=

1.890 m/sec

Unobstructed Sectional Area

A

=

Total Area - Obstructed Area

Obstructed area

=

205.80

=

2 162.74 m

=

-

43.06

(Total Width of Slab X (Top of Box - Soffit)) + (No. of Walls*(Soffit-Raft Top)*Thickness of Wall)

=

49.00

x

0.700

+

4

x

3.648

x

0.60 = Total Area

= =

2 43.06 m

(Total Width of Box) - (HFL-Raft Top) 49.00

x

281.70

-

277.50 = Percentage of obstruction

=

2 205.80 m

Obstructed Area

x

Total Area =

43.06

x

100

205.80

Sectional Area at Obstruction Afflux

A1

=

20.92 %

=

2 119.69 m

=

0.182 mtr.

Hence OK.

100

5) Summary Catchment Area

25.90 Km2

Linear waterway

48.55 m

Manning's Discharge

529.76 m3/sec

Design Discharge

540.35 m3/sec

Rugosity coefficients Wetted area Wetted perimeter

0.030 229.15 m2 69.32 m

Hydraulic Mean Depth

3.022 m

Velocity

1.89 m/sec

Bed slope

1 in 1115

Clearance

1.2 m

Afflux

0.182 m

.

Related Documents

01 Hydraulics 07
January 2021 0
007-maccika-01-07
January 2021 1
Kodalu-pilla-01-07
January 2021 1
Hydraulics
March 2021 0
Hydraulics
January 2021 2

More Documents from "thummadharani6698"