Chair of Petroleum & Geothermal Energy Recovery

Petroleum Engineering Summer Course 2015 Wellhead Design & Completions

Clemens Langbauer www.starse.com.cn

Chair of Petroleum & Geothermal Energy Recovery

Well Structure / Wellhead Design

Christmas Tree

Cellar

sunryoil.com/wellhead_xmas.html

Page 2

Chair of Petroleum & Geothermal Energy Recovery

Well Structure Wellhead Casing Shoe

Marine conductor Conductor casing Intermediate casing/

Liner hanger with LH packer

Production casing

Production liner

Production liner wt. extension Page 3

Chair of Petroleum & Geothermal Energy Recovery

Bit / Casing Size Selection

Source: Petroleum Engineering Handbook: Drilling Engineering

Page 4

Chair of Petroleum & Geothermal Energy Recovery

Bit / Casing Size Selection Example RAG: Wellbore Diameter

Casing Diameter Conductor

20”

17 ½”

Surface Casing

13 3/8”

12 ¼”

Intermediate Casing

9 5/8”

8 ½”

Intermediate Casing

7”

6 ¼ od. 6”

Production Liner

4 ½”

Page 5

Chair of Petroleum & Geothermal Energy Recovery

Wellhead Tubing Head Adapter

Tubing Hanger

Tubing Head

Casing Spool

Secondary Seal Primary Seal Casing Hanger

Casing Head

Vetcogray: FC wellhead systems

Page 6

Chair of Petroleum & Geothermal Energy Recovery

Wellhead

Vetcogray: FC wellhead systems

Page 7

Chair of Petroleum & Geothermal Energy Recovery

Cellar A dug-out area, lined with cement or very large diameter thin-wall pipe, located below the rig. -

Depth of the cellar is such that the master valve of the Christmas tree is easy to reach from ground level Prior to setting surface casing, the cellar also takes mud returns from the well Cavity for the casing spools

www.ogpe.com

www.frogsinternational.com

Page 8

Chair of Petroleum & Geothermal Energy Recovery

Base Plate The base plate is a load-supporting device attached to the starting casing head by means of either mechanical or permanent (welding) connection. Baseplate Size 11" 13 5/8" 16 3/4" 20 3/4" & 21 1/4"

Current Load Capacity 2200 kN vertical load 3300 kN vertical load 4400 kN vertical load 4400 kN vertical load

www.downingwell.com

www.networkintl.com

Page 9

Chair of Petroleum & Geothermal Energy Recovery

Casing Head -

attached to the top end of the surface casing

-

provides a support for the other strings and a sealing of the annular space between two casing strings

-

composed of a casing-hanger bowl to support the smaller casing

www.fmctechnologies.com

Source: Petroleum Engineering Handbook

Page 10

Chair of Petroleum & Geothermal Energy Recovery

Casing Hanger The Casing Hanger is a mechanism/ device that seats in the bowl of the casing head / casing spool to suspend the next smaller casing string securely and provide a seal between the suspended casing and the casing head bowl.

www.fmctechnologies.com

Source: Petroleum Engineering Handbook

Page 11

Chair of Petroleum & Geothermal Energy Recovery

Casing Spool A Casing Spool is an intermediate casing head attached to the top flange to the top flange of the underlying casing head to provide a support for the next smaller casing string and a sealing of the annular space between the two casing strings.

www.fmctechnologies.com

Source: Petroleum Engineering Handbook

www.techno-me.com

Page 12

Chair of Petroleum & Geothermal Energy Recovery

Primary / Secondary Packoff The primary and secondary packoffs are used to seal the annular space between two casing strings.

Vetcogray: FC wellhead systems

Page 13

Chair of Petroleum & Geothermal Energy Recovery

Tubing Head A Tubing Head is a spool type unit attached to the top flange of the uppermost casing head to provide a support for the tubing string and to seal the annular space between the tubing string and the production casing string.

www.fmctechnologies.com

Source: Petroleum Engineering Handbook

Page 14

Chair of Petroleum & Geothermal Energy Recovery

Tubing Hanger A Tubing Hanger is a device used to provide a seal between the tubing and the tubing head.

www.fmctechnologies.com

Source: Petroleum Engineering Handbook

www.fmctechnologies.com

Page 15

Chair of Petroleum & Geothermal Energy Recovery

Tubing Head Adapter A Tubing Head Adapter provides a transition from the wellhead to the master valve of the tree.

www.fmctechnologies.com

Source: Petroleum Engineering Handbook

Page 16

Chair of Petroleum & Geothermal Energy Recovery

Wellhead Installation

Flanged valve Casing head

Pressure gauge

Threaded ball valve Base plate

Page 17

Chair of Petroleum & Geothermal Energy Recovery

Wellhead Installation

Casing hanger Casing spool

Flanged valve Casing head

Pressure gauge

Threaded ball valve Base plate

Page 18

Chair of Petroleum & Geothermal Energy Recovery

Wellhead Installation Tubing head

Casing hanger Casing spool

Flanged valve Casing head

Pressure gauge

Threaded ball valve Base plate

Page 19

Chair of Petroleum & Geothermal Energy Recovery

Subsea / Land Wellhead

Source: Petroleum Engineering Handbook: Drilling Engineering

Page 20

Chair of Petroleum & Geothermal Energy Recovery

Subsea / Land Wellhead

Source: Petroleum Engineering Handbook: Drilling Engineering

Page 21

Chair of Petroleum & Geothermal Energy Recovery

Example

Evaluate the required components, the size, the height and the weight of a wellhead that must support three casing strings (13 3/8”, 9 5/8”, 7”) and a 2 7/8” tubing string.

Page 22

Chair of Petroleum & Geothermal Energy Recovery

Ex: Casing Head

Vetcogray: FC wellhead systems

Page 23

Chair of Petroleum & Geothermal Energy Recovery

Ex: Casing Hanger

Vetcogray: FC wellhead systems

Page 24

Chair of Petroleum & Geothermal Energy Recovery

Ex: Casing Packoffs

Vetcogray: FC wellhead systems

Page 25

Chair of Petroleum & Geothermal Energy Recovery

Ex: Casing Spool

Vetcogray: FC wellhead systems

Page 26

Chair of Petroleum & Geothermal Energy Recovery

Ex: Tubing Head

Vetcogray: FC wellhead systems

Page 27

Chair of Petroleum & Geothermal Energy Recovery

Ex: Tubing Hanger

Vetcogray: FC wellhead systems

Page 28

Chair of Petroleum & Geothermal Energy Recovery

Ex 1: Tubing Head Adapter

Vetcogray: FC wellhead systems

Page 29

Chair of Petroleum & Geothermal Energy Recovery

Homework 1 Homework 1 Deadline: 25.08.2015

09:00

Evaluate the required components, the size, the height and the weight of a wellhead that must support four casing strings (20”, 13 3/8”, 9 5/8”, 7”) and a 3 1/2” tubing string. (Include the product number of the selected component!)

Page 30

Chair of Petroleum & Geothermal Energy Recovery

Christmas Tree Assembly The Christmas Tree is an assembly of valves and fittings used to control production and provide access to the production tubing string. It includes all equipment above the tubing head top flange.

completioninfo.com

Source: Petroleum Engineering Handbook

Page 31

Chair of Petroleum & Geothermal Energy Recovery

Christmas Tree Assembly The purposes of the Christmas tree are to -

provide the primary method of closing in a well

-

isolate the well from adjacent wells

-

connect the flowline

-

provide vertical access for well interventions (slickline, electricline, coiled tubing etc.) whilst the well is live

-

interface with the tubing hanger

-

Connect or interface the tree to the wellhead

Source: Petroleum Engineering Handbook

Page 32

Chair of Petroleum & Geothermal Energy Recovery

Christmas Tree Assembly

J. Bellarby: Well Completion Design

Page 33

Chair of Petroleum & Geothermal Energy Recovery

Oil Well Tree Assembly

Renpu: Advanced Well Completion Engineering

Page 34

Chair of Petroleum & Geothermal Energy Recovery

Gas Well Tree Assembly

Renpu: Advanced Well Completion Engineering

Page 35

Chair of Petroleum & Geothermal Energy Recovery

Subsea Christmas Tree Assembly

www.offshore-mag.com

Page 36

Chair of Petroleum & Geothermal Energy Recovery

Christmas Tree – Safety System

J. Bellarby: Well Completion Design

Page 37

Chair of Petroleum & Geothermal Energy Recovery

Completion Engineering A completion is the interface between the reservoir and the surface. The objective is to allow a safe and environmental friendly protection.

www.starse.com.cn

Page 38

Chair of Petroleum & Geothermal Energy Recovery

Completion Components • Surface Components • Christmas Tree • Well Head

• Intermediate Components • • • •

Subsurface Safety Valves Tubing Injection Lines Completion Fluids

• Reservoir Components • Perforations • Sand screens • Packers l

• Pumps Page 39

Chair of Petroleum & Geothermal Energy Recovery

Completions Completion as part of the well control envelope: ‘At least two tested independent barriers between hydrocarbons in the reservoir and the environment at all times’ Primary barrier: barrier that initially prevents hydrocarbons from escaping e.g. the mud, the tubing or the Christmas tree Secondary barrier: backup to the primary barrier – it is not normally in use until the primary barrier fails. The secondary barrier must be independent of the primary barrier. Any event that could destroy the primary barrier should not affect the secondary barrier.

Page 40

Chair of Petroleum & Geothermal Energy Recovery

Completions

J. Bellarby: Well Completion Design

Page 41

Chair of Petroleum & Geothermal Energy Recovery

Completions

Source: Well Completion Design Book

Page 42

Chair of Petroleum & Geothermal Energy Recovery

The role of a Completion Engineer

J. Bellarby: Well Completion Design

Page 43

Chair of Petroleum & Geothermal Energy Recovery

The role of a Completion Engineer

J. Bellarby: Well Completion Design

Page 44

Chair of Petroleum & Geothermal Energy Recovery

Types of Completions Objectives of wells: Producer: - Oil - Gas - Water Injector / Disposal: - Gas - Water - Steam Combination: - Gas storage - Time shifted (produce HC and then convert to water injection duty) - Produce through the tubing and inject down the annulus Page 45

Chair of Petroleum & Geothermal Energy Recovery

Types of Completions Reservoir Completion: connection between reservoir and well Decisions: - Well trajectory and inclination - Open hole versus cased hole - Sand control requirement and type of sand control - Stimulation (proppants or acid) - Single or multi-zone (commingled or selective) Upper Completion: conduit from reservoir completion to surface facilities Page 46

Chair of Petroleum & Geothermal Energy Recovery

Reservoir Completions

J. Bellarby: Well Completion Design

Page 47

Chair of Petroleum & Geothermal Energy Recovery

Upper Completions

J. Bellarby: Well Completion Design

Page 48

Chair of Petroleum & Geothermal Energy Recovery

Completions

J. Bellarby: Well Completion Design

Page 49