Loading documents preview...
BKD
FINAL
- 09.02.2017.
SOHAR REFINERY IMPROVEMENT PROJECT JOB NO : 120476 / JI-2022
Inspection and Test Plan Project: SOHAR REFINERY IMPROVEMENT PROJECT (SRIP) Owner : Oman Refineries and petroleum development Industries SAOC ( ORPIC)
PO No.: 4100-P-615Z-451-P01-A01
Contractor: Dealim -Petrofac SRIP JV
Crane Equipment 1
Kick Off Meeting
N/A
Project Documents
Project manager& manufacturer representative
2
GA Drawing
Project engineering drawings
Approvals from DPJV
Design
DPJV
R
R
R
3
WPS PQR Hoist
Material Certificate
EN 10204 3.1
QC
DPJV
R
R
R
4
Procedure NDE
ASME 8
Approved Inspector
NDT Report
R
R
R
5
Procedure FAT
Lifting Procedure & Plan
QC
FAT Report
R
R
R
6
Hook
Hook Inspection & Test plan
Visual Checking/Quantity check
QC
Hook Inspected Certificate
R
R
R
7
Rope
Rope Inspection & Test plan
Measuring
QC
EN 10204 certificate
R
R
R
Electromagnetic, Magnetic particle test & white contrast Load test & Overload test
MOM
R
R
R
3.1
Remarks
OWNER
DPJV
BYT
Konecranes for Equipment & Al Barakah for Girder
ITEM/EQUIPMENT DESCRIPTION :ME 7110, 8810,8820, 7610 & 1810
Verification Document. (Quality Control Form, Inspection Record etc)
S. N.
Activity Description
Sheet 01 of 03
Supplier’s Verification Personnel
Reference Document (Supplier’s Procedure, Contract Specification, Standard, Codes, drawings)
Rev no: F
Acceptance Criteria (Specified Test Requirements etc.) + Frequency of Test
Doc.No. : V-615Z-451-00000-Q03-001
Drum Inspection & Test plan
Visual Checking & Operation test
QC
Drum Inspected Certificate
R
R
R
Trolley
Trolley Inspection & Test plan
Visual Checking & Operation test
QC
Crane FAT report
R
R
R
10
Motor
Motor Inspection & Test plan
Functional test
QC
Motor Inspected Certificate
R
R
R
11
Panel
Panel Inspection & Test plan
Main Dimension check
QC
Inspection certificate
R
R
R
12
Gearbox
Gear box Inspection & Test plan
Main Dimension check
QC
Report in ERP system
R
R
R
14
Material receiving inspection
Factory Inspection & Test plan
Visual Checking/Quantity check
QC
Report in ERP system
R
R
R
15
Drum manufacturing
Factory Inspection & Test plan
Measuring
QC
Drum Inspected Certificate
R
R
R
16
Hoist pre-assembly (FAT-inspection point)
Factory Inspection & Test plan
Visual Checking & Operation test
QC
Inspection Certificate
R
R
W
17
Test drive (FATinspection point)
Factory Inspection & Test plan
Visual Checking & Operation test
QC
Inspection Certificate
R
R
W
FAT (crane workshop)
Functional test
QC
Crane FAT report
R
R
W
FAT (crane workshop)
Main Dimension check
QC
Crane FAT report
R
R
W
8
Drum
9
18 19
Hoist final assembly (FAT inspection point) Final inspection (FATinspection point)
Remarks
Petrofac ( Nominated TPI ) Company ( Nominated TPI )
Main Supplier
Sub Supplier ( If Applicable )
Verification Document. (Quality Control Form, Inspection Record etc)
Supplier’s Verification Personnel
Acceptance Criteria (Specified Test Requirements etc.) + Frequency of Test
Reference Document (Supplier’s Procedure, Contract Specification, Standard, Codes, drawings)
S. N.
Activity Description
20
C-testing
Procedure
Operational test
QC
Report
21
Hoist speed verification
SAT
Operational test
QC
Crane SAT
22
Effectiveness of brakes
SAT
Operational test
QC
23
Effectiveness of safety devices
SAT
Operational test
QC
Visual Inspection & measurement
QC
R
R
W
R
R
W
Crane SAT report
R
R
W
Crane SAT report
R
R
W
R
R
R/W
R
R
R
R
R
R
report
Girder
24
Receiving material inspection structural steel, Steel Plates etc Dimensional inspection visual inspection Test certificate
25
26
1. Specification for Plates: BS EN 10058 & 10059:2003, BS EN 10056-1&2, BS EN 10025, BS EN 10025-2, EN 10025 & EN 10025-1,2: 2004. (S275 JR & S275 JR+AR) Rails: DIN 17100 Gr.ST52.3 Material Test Certificate(MTC)
Before welding & fit up stage: Fit up stage
V-615Z-415-ME7110-B01-001 REV.E V-615Z-415-ME8810-B01-002 REV.E V-615Z-415-ME8820-B01-003 REV.E V-615Z-415-ME7610-B01-004 REV.E
Welding & Fit up Stage: Fit up components
V-615Z-415-ME7110-B01-001 REV.E V-615Z-415-ME8810-B01-002 REV.E V-615Z-415-ME8820-B01-003 REV.E V-615Z-415-ME7610-B01-004 REV.E
Verify drawings Material Inspection as per job # & Special buy out items
QC
Components dimensional checks alignments check, holes, and stamp markings.
QC
Material Receiving Inspection Report – & Material Test Certificate (EN 10204/ 3.1) Daily Report – Fabrication – Marking & Cutting QC Check as per Drawing. Fabrication Process Report
Remarks
Petrofac ( Nominated TPI ) Company ( Nominated TPI )
Main Supplier
Sub Supplier ( If Applicable )
Verification Document. (Quality Control Form, Inspection Record etc)
Supplier’s Verification Personnel
Acceptance Criteria (Specified Test Requirements etc.) + Frequency of Test
Reference Document (Supplier’s Procedure, Contract Specification, Standard, Codes, drawings)
S. N.
Activity Description
27
Weld preparation of weld joint
ASME Sec. IX&AWSD1.1
28
Weld Procedure Qualification
WPS & PQR
29
Welder Qualification
Welder performance qualification record
30
Visual check of weld
V-615Z-415-ME7110-B01-001 REV.E V-615Z-415-ME8810-B01-002 REV.E V-615Z-415-ME8820-B01-003 REV.E V-615Z-415-ME7610-B01-004 REV.E
Weld joints visual Inspection Verify with procedure
QC
QC
Fabrication Process Report& Welding Reports. WPS-S01& WPS – S02 PQR – S01 & PQR – S02
R
R
R
R
R
H
Check Certified Welder documents
QC
W-001 & W-003
R
R
R
Visual Random check
QC
General Inspection Report - FAB
R
R
R
Related Equipment’s
Approved Inspector TPI
R
R
R/W
32
NDE
Electromagnetic, Magnetic particle test & white contrast Butt Welds-100% RT Fillet Welds(Primary Member)100% MPT Fillet Welds(Secondary Member)-10%
33
Surface Treatment – Sand Blasting
Painting Procedure
RANDOM Inspection
QC
Final Inspection Report -B & P
R
R
R
34
Painting- Primer, Intermediate & Top coat
Painting Procedure
RANDOM
QC
Final Inspection Report -B & P
R
R
W
35
Non- Conformity Management
Non Conformity Report
100% clearance
QC
R
R
H
36
Final Inspection Record
Records
100% clearance
QC
Non Conformance Report Final Inspection Fabrication
R
R
H
37
Full load test
100% Load
Visual Inspection & Certification by TPI
QC
Certificate by TPI
R
R
W
38
Sound level Check
100% Load
Visual Inspection & Certification by TPI
QC
R
R
W
Inspection Report
Certificate by TPI
Remarks
Petrofac ( Nominated TPI ) Company ( Nominated TPI )
Main Supplier
Sub Supplier ( If Applicable )
Verification Document. (Quality Control Form, Inspection Record etc)
Supplier’s Verification Personnel
Acceptance Criteria (Specified Test Requirements etc.) + Frequency of Test
Reference Document (Supplier’s Procedure, Contract Specification, Standard, Codes, drawings)
S. N.
Activity Description
39
Dynamic Load test
100% Load
Visual Inspection & Certification by TPI
QC
Certificate by TPI
R
R
W
40
Bridge deflection test
Allowed deflection in accordance with the Span
Record the allowance
QC
Certificate by TPI
R
R
W
41
Overload test
125% Load
Visual Inspection & Certification by TPI
QC
Certificate by TPI
R
R
W
42
Final Inspection
TPI
Visual Check
QC
Certificate by TPI
R
R
H
43
Issue of IRN
Project IRN
Visual Check
QC
Client Issue record
R
R
H
44
Packing Inspection
Packing procedure
Visual Inspection
QC
R
R
H
45
Site load test
Method Statement
Witness, Inspection & Certification by TPI & Client
QC
R
R
H
W = Witness
R = Review
M = Monitoring
V-615Z-451-00000H27-001
SAT Project Record
Remarks
Petrofac ( Nominated TPI ) Company ( Nominated TPI )
Main Supplier
Sub Supplier ( If Applicable )
Verification Document. (Quality Control Form, Inspection Record etc)
Supplier’s Verification Personnel
Acceptance Criteria (Specified Test Requirements etc.) + Frequency of Test
Reference Document (Supplier’s Procedure, Contract Specification, Standard, Codes, drawings)
S. N.
Activity Description
H = Hold Point
W-DPJV/Owner representative chooses to be present throughout the scheduled activity. Vendor must give due notice of the start of this activity. If DPJV/Owner Representative fails to attend, Vendor reserves the right to start without the DPJV/ORPIC representative presence, and the activity can be validated by DPJV/ORPIC representative through the documents review. R-DPJV/Owner representative will review the records previously agreed upon to verify conformance with the requirements. Presence of DPJV/Owner representative or previous notification of the scheduled activity is not required. M-DPJV/Owner representative shall be informed in advance about starting scheduled activity, nevertheless, that activity may be carried out without DPJV/Owner representative presence. H-DPJV/Owner representative shall be present during the activity. The activity shall not be performed without his presence. If customer representative fails to attend,
Note: ITP clause # 20, 37 to 45 will be performed at site after installation.