Page 1 of 168

HINDUSTAN PETROLEUM CORPORATION LIMITED Visakh Refinery Modernization Project Doc Title: Heat Load Calculation for HVAC System Doc No: AV2K20-085-DOC-A001 OWNER’S CONSULTANT & PMC:

ENGINEERS INDIA LIMITED

EPC CONTRACTOR:

MYTHRI INFRA HVAC CONTRACTOR:

ADVANCE VENTILATION PVT LIMITED

0 Rev

10.10.2019

FOR REVIEW

R.L

J.K

S.N

Date

Purpose of Issue

Prepared By

Checked By

Approved By

08-NOV-2019 SUTHAR KETANBHAI (C360) 1 of 168

Page 2 of 168

HEAT LOAD ESTIMATION FOR VRMP

INDEX FOR HEAT LOAD OF SUBSTATION-86 CT & NHT CCR BUILDING SECTION SECTION 1

DESCRIPTION 1.1 General Project Information 1.2 Applicable Codes &Standards

SECTION 2

SECTION 3

SECTION 4

SECTION 5

SECTION 6

PAGE NOS.

1. General Information

2.DesignParameters 2.1WeatherData 2.2IndoorCriteria 2.3Lighting Load, Equipment Load, Fresh air ACPH, Occupancy 3.U-Factors, corrective ETD value for Wall &Roof, Sensible & latent heat load by human being Overall heat transfer co-efficient-Detail Calculation Overall heat transfer co-efficient – Relevant pages from ASHRAE&ISHRAE Corrective ETD value for wall &roof Sensible & latent heat load by human being Corrective ETD value for wall, roof & glass Reference Documents 4.Heat load 4.1.1 Heat load summary for Substation Building 86-CT 4.1.2 Summer, Monsoon & Winter heat load for Substation Building 86-CT 4.2.1 Heat load summary for NHT CCR Building 4.2.2 Summer, Monsoon & Winter heat load for NHT CCR Building

03-05

06-14

15-34

35-69

5. Equipment selection

70-71

6.Architecture Drawing

72-82

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 2 of 168

Page 2 of 82

Page 3 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-1 GENERAL INFORMATION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 3 of 168

Page 3 of 82

Page 4 of 168

HEAT LOAD ESTIMATION FOR VRMP

1.1GENERAL PROJECT INFORMATION PROJECT

HPCL VIZAG REFINERY EXPANSION PROJECT

OWNER

HINDUSTAN PETROLEUM CORPORATION LIMITED

HVAC CONTRACTOR

ADVANCE VENTILATION PVT. LTD.

PLANT LOCATION

VISAKHAPATNAM, INDIA

1. SUBSTATION BUILDING- 86 CT

BUILDING

2. NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 4 of 168

Page 4 of 82

Page 5 of 168

HEAT LOAD ESTIMATION FOR VRMP

1.2APPLICATION CODE AND RELEVENT STANDARD LATEST ISSUE  ASHRAE (American society of Heating, Refrigeration & Air-conditioning Engineer’s) fundamentals, Systems, Equipment’s & Application Handbook.  ISHRAE(Indian society Of Heating Refrigeration & Air Conditioning Engineer’s) Fundamentals, Systems, Equipment’s &Application Handbook  For Outdoor & Indoor Design conditions.  Ref. document no- (B015-000-80-43-SP-8203, Rev.0, Pg 9-10 ) for NHT CCR Building  Ref. document no- (B015-000-80-43-SP-8204, Rev.0, Pg 10 ) for Substation Building- 86 CT

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 5 of 168

Page 5 of 82

Page 6 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-2 DESIGN PARAMETERS

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 6 of 168

Page 6 of 82

Page 7 of 168

HEAT LOAD ESTIMATION FOR VRMP

2.1 WEATHER DATA  Design Parameters Name of city

VISAKHAPATNAM

Location(state)

ANDHRA PRADESH

 Design outside atmospheric condition for HVAC calculation Season

DBT(0C)

WBT(0C)

RH%

Summer

33.3

27.8

65.8

Monsoon

30.6

27.8

80.6

Winter

18.3

13.9

61.4

2.2 Indoor design condition Room / Area

Design temp DBT(0C)

RH%

Substation Building- 86 CT

26 +/- 1

50 +/- 5

NHT CCR Building

24 +/-1

50 +/- 5

2.3 Lighting Load, Equipment Load, Fresh air ACPH, Occupancy 

Lighting Load= 5W/ sq.m



Equipment Load/ Fresh Air ACPH/ Occupancy=

 Ref. document no- (B015-000-80-43-SP-8203, Rev.0, Pg 10-11 ) for NHT CCR Building  Ref. document no- (B015-000-80-43-SP-8204, Rev.0, Pg 11 ) for Substation Building- 86 CT

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 7 of 168

Page 7 of 82

Page 8 of 168

HEAT LOAD ESTIMATION FOR VRMP

DESIGN PARAMETERS SUBSTATION-SS 86 CT BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 8 of 168

Page 8 of 82

Page 9 of 168

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR PLANT & NON PLANT BUILDING WORKS

DOCUMENT No. B015-000-80-43-SP-8204 Rev. 0 Page 10 of 18

y) All Instruments, Controls and safety devices (Contractor to attach list of controls and safety devices) including all necessary interlocks, control panel, cabling, wiring etc. as detailed in the Instrumentation Specifications attached elsewhere. z) Electrical work/items as per Electrical specifications attached elsewhere. aa) Self standing/ wall mounted audio-visual annunciation panel. bb) Plant room ventilation system. 3.2.3

The entire work of design, engineering, manufacture, installation, commissioning and performance testing of equipment/systems shall be executed by one of the roved vendor for HVAC work.

3.2.4

Contractor shall develop the complete HVAC system configuration and submit for

3.2.5

Contractor shall be solely responsible to demonstrate the specified inside conditions throughout the year irrespective of any variation in the outside condition.

3.2.6

DESIGN DATA

3.2.6.1 Outside Design Condition SEASON

DBT (ºC)

WBT (ºC)

Summer

33.3

27.8

Monsoon

30.6

Winter

18.3

Air Quantity (As per Class GX (severe) of ANSI/ISAS71.04) H2S

50 ppb

27.8

SO2/SO3

300 ppb

13.9

Cl2

10 ppb

NOX

1250 ppb

Notes: 1. Outdoor design condition mentioned above shall be followed for AC heat load calculation purpose.

3.2.6.2

Inside Design Conditions S. No.

1. 2. 3.

Area

DBT, °C

SRR Building (area to be air-conditioned) Switch Gear Hall & Operator Room of Sub Station building Scale Room Building (For Split ACs)

% RH

23 ± 1

50 ± 5

26 ± 1

50 ± 5

24 ± 1

30 to 70

08-NOV-2019

Air Quality (As Per Class G1(mild) of doc. ISA -571.04) H2S < 3 ppb SO2/SO3 < 10 ppb Cl2 < 1 ppb NOx < 50 ppb Not Applicable

Copyright EIL

Format No. EIL 1641-1924 Rev. 1

SUTHAR KETANBHAI (C360) 9 of 168

Page 9 of 82

All rights reserved

Page 10 of 168

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR PLANT & NON PLANT BUILDING WORKS

3.2.6.3

DOCUMENT No. B015-000-80-43-SP-8204 Rev. 0 Page 11 of 18

Other Design Requirements Description Under Deck Insulation

Requirement Thermal insulation shall be provided for the areas to be air-conditioned, packaged AC Rooms and AHU Rooms. Fouling factor for water cooled 0.0004 hr.m².ºC/kcal Condenser Refrigerant (for VCR based AC R-134a or R-407a or R-407c or R-410a System) Hours of operation 24 hrs / 365 Days Lighting Load 5 Watts/m2 Outdoor Fresh Air 2.0 ACPH for Substation building & 1.5 ACPH for SRR Building Equipment Heat Dissipation As per Below Table Occupancy As per Below Table Table: Elect/Instru. Equipment Heat Dissipation & Occupancy Building Room/Area to Eqpt. Heat Occupancy be Air Load Conditioned (Elec.+Instru.) (Nos.) (kW) 1 Sub Station-96 Switch Gear Hall 97.0* -(Tankages) Operator Room 1.0* 4 2 Sub Station-86 Switch Gear Hall 111.0* -(Cooling Tower) Operator Room 1.0* 4 Rack Room 44.0 3 UPS Room 9.0 -Tech. Room 1.0 4 Engg. Room 1.0 3 Lobby --UPS Room 11.0 -Tech. Room 1.0 4 Engg. Room 1.0 3 Lobby --3 SRR-Tankages Rack Room 44.0 3 UPS Room 9.0 -Tech. Room 1.0 4 Engg. Room 1.0 3 Lobby --4 SRR- New Flare & Rack Room 53.0 3 Blending station Engg. Room 1.0 3 UPS Room 8.6 -Lobby --*: Equipment Heat Load mentioned includes heat load due to lighting also, Hence while calculating heat load for that particular area, lighting load shall not be considered. Sr. No.

3.2.7

Air conditioning system load/ capacities specified in Scope of Work & Supply are minimum to be considered by the contractor for HVAC equipment and same is given for estimation purpose only. Contractor shall submit the detailed heat load calculations as per the approved/ AFC building drawings and equipment

08-NOV-2019

Copyright EIL

Format No. EIL 1641-1924 Rev. 1

SUTHAR KETANBHAI (C360) 10 of 168

Page 10 of 82

All rights reserved

Page 11 of 168

HEAT LOAD ESTIMATION FOR VRMP

DESIGN PARAMETERS NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 11 of 168

Page 11 of 82

Page 12 of 168 Page 1088 of 1419

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR CONSTRUCTION OF FIELD ROOM & MSC. CIVIL WORKS

DOCUMENT No. B015-000-80-43-SP-8203 Rev. 0 Page 9 of 18

viii) Supply and fixing of steel supports for duct/cable/pipe/tubing etc. ix) Breaking and making good of openings in wall. x) Temporary scaffolding related to erection, testing and commissioning.

3.1.4

o)

Structural steel works as required for equipment support and base frame of equipment.

p)

Electrical panels and electrical works as per Electrical Specification attached elsewhere in the tender.

q)

Self standing/ wall mounted audio-visual annunciation panel.

Each air conditioning system with Inverter Controlled Split Air Conditioners for CWTP Field Room building and Auxiliary Fire station Building shall comprise of but not limited to the following: a)

Inverter controlled split air conditioner complete with all accessories, fittings and voltage stabilizer with time delay relay. Split unit shall have wall mounted indoor unit and remotely located air cooled condenser (outdoor unit) with insulated refrigerant piping, Controls and line accessories, Initial charge of refrigerant, Electrical and civil works (e.g. civil work related to concealing of refrigerant piping, condensate piping to the nearest drain, cabling in AC space and outside upto the outdoor unit) as required including the structural steel framework, pedestal to mount the indoor/outdoor units, supports for indoor/outdoor units, supports & clamps for refrigerant piping/cables, stabilizer, hold down nuts & bolts.

b)

Spares for commissioning and start up.

3.1.5

The entire work of design, engineering, manufacture, installation, commissioning and performance testing of equipment/systems shall be executed by one of the owner’s/EIL approved vendor for HVAC work (attached elsewhere in the tender). The list of acceptable sub-vendors for bought out items for HVAC System has also been tabulated in cl. no. 10.0 below for consideration by HVAC Contractor.

3.1.6

Contractor shall develop the complete HVAC system configuration and submit for Owner/EIL’s approval before starting the detail engineering work.

3.1.7

Contractor shall be solely responsible to demonstrate the specified inside conditions throughout the year irrespective of any variation in the outside condition.

3.1.8

DESIGN DATA

3.1.8.1 Outside Design Condition SEASON

DBT (ºC)

WBT (ºC)

Summer

33.3

27.8

Monsoon

30.6

27.8

SO2/SO3 ≤ 300 ppb

Winter

18.3

13.9

Cl2

≤ 10 ppb

NOX

≤ 1250 ppb

08-NOV-2019 Format No. EIL 1641-1924 Rev. 1 SUTHAR KETANBHAI (C360)

Air Quantity (As per Class GX (severe) of ANSI/ISAS71.04) H2S

≤ 50 ppb

Copyright EIL – All rights reserved

12 of 168

Page 12 of 82

Page 13 of 168 Page 1089 of 1419

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR CONSTRUCTION OF FIELD ROOM & MSC. CIVIL WORKS

DOCUMENT No. B015-000-80-43-SP-8203 Rev. 0 Page 10 of 18

Notes: 1. Outdoor design condition mentioned above shall be followed for AC heat load calculation purpose. 2. Design temperature for sizing of air cooled exchanger/condenser shall be 450C (peak ambient temperature).

3.1.8.2

Inside Design Conditions S. No.

1.

2.

3.

3.1.8.3

Sl. Area

DBT, °C

Switch Gear Hall & Operator Room of Sub Station building Shift-in-charge & Dining room of Field Room Buildings CWTP Field Room & Auxiliary Fire Station Building (For Split ACs)

% RH

26 ± 1

50 ± 5

24 ± 1

50 ± 5

Air Quality (As Per Class G1(mild) of doc. ISA -571.04) H 2S < 3 ppb SO2/SO3 < 10 ppb Cl2 < 1 ppb NOx < 50 ppb

24 ± 1

30 to 70

Not Applicable

Other Design Requirements Description Under Deck Insulation

Requirement Thermal insulation shall be provided for the areas to be air-conditioned, packaged AC Rooms and AHU Rooms. Fouling factor for water cooled 0.0004 hr.m².ºC/kcal Condenser Cooling water inlet temperature 33°C Design temperature for sizing Air 45°C cooled exchanger/condenser Refrigerant (for VCR based AC R-134a or R-407a or R-407c or R-410a System) Hours of operation 24 hrs / 365 Days Lighting Load 5 Watts/m2 Outdoor Fresh Air a. 2.0 ACPH or 17 CFM per person whichever is higher for Substation building & b. 1.0 ACPH or 17 CFM per person whichever is higher for Field Room buildings Equipment Heat Dissipation As per Below Table Occupancy As per Below Table

Sr. No.

Table: Elect/Instru. Equipment Heat Dissipation & Occupancy Building Room/Area to Eqpt. Heat Occupancy be Air Load Conditioned (Elec.+Instru.) (Nos.)

08-NOV-2019 Format No. EIL 1641-1924 Rev. 1 SUTHAR KETANBHAI (C360)

Copyright EIL – All rights reserved

13 of 168

Page 13 of 82

Page 14 of 168 Page 1090 of 1419

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR CONSTRUCTION OF FIELD ROOM & MSC. CIVIL WORKS

DOCUMENT No. B015-000-80-43-SP-8203 Rev. 0 Page 11 of 18

(kW) 1

Sub Station-92

2

Sub Station-98

3

Each Field Room (Having Water cooled PAC System)

Switch Gear Hall Operator Room Switch Gear Hall Operator Room Shift-in-charge Room Dining Room

73.0* 0.7* 40.0* 0.7* 1.0

-6 -6 6

--

6

*: Equipment Heat Load mentioned includes heat load due to lighting also. Hence while calculating heat load for that particular area, lighting load need not to be considered. However, for other buildings / areas, lighting load shall be considered as specified in this job specification. 3.1.9

Air conditioning system load/ capacities specified in Scope of Work & Supply are minimum to be considered by the contractor for HVAC equipment and same is given for estimation purpose only. Contractor shall submit the detailed heat load calculations as per the approved/ AFC building drawings and equipment shall be selected for the higher of the two capacities i.e. capacities as per Scope of Work and capacities as per approved heat load calculation. No price or time implication shall be admissible to the contractor due to increase in heat load values provided equipment heat dissipation & air-conditioned area remain the same. Also, no price or time implication shall be admissible to the contractor on account of selection of higher capacity machine due to nonavailability of required/ exact capacity machine in the market. Contractor shall be solely responsible to demonstrate the specified inside conditions throughout the year irrespective of any variation in the outside condition. Accordingly, Contractor shall cross check the estimated plant capacity in his own interest before accepting the same. In case, Contractor desires to increase the plant capacity, he shall furnish adequate technical reasons and necessary technical data including heat load calculations in support of such increased plant capacity during pre-bid meeting. However, minimum capacity of the plant shall be as indicated in the Scope of Work & Supply, which shall be complied by the contractor.

3.1.10 Chemical filtration shall be provided in fresh air circuit of AC system (installed in AHU Room/ Packaged AC room) to maintain air quality (G1 environment) inside satellite rack room/ substation. Chemical filters shall be selected to capture Group-A gases as per ISA-71- 04 standard (from GX environment at outside to G1 environment at inside). 3.1.11 Air Conditioning equipment shall be interlocked with gas/smoke detection and firefighting systems. For Satellite Rack Room, required Hydrocarbon Detection System shall also be provided in AC suction and in ducts as per OISD standard. 3.1.12 Contractor shall consider heat dissipation from electrical/electronic equipment, Lighting Load & Occupancy while estimating the capacity of air-conditioning system. 3.1.13 Safety factor shall be considered as minimum 12.5% in respect of Room Sensible Heat and minimum 10% in respect of Room Latent Heat. 3.1.14 Packaged Units/ AHUs shall provide cooling and dehumidification in summer/monsoon by handling mixture of fresh and return air. Reheating shall be 08-NOV-2019 Format No. EIL 1641-1924 Rev. 1 SUTHAR KETANBHAI (C360)

Copyright EIL – All rights reserved

14 of 168

Page 14 of 82

Page 15 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-3 U-VALUE CALCULATION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 15 of 168

Page 15 of 82

Page 16 of 168

HEAT LOAD ESTIMATION FOR VRMP

U-FACTOR SUMMARY ASHRAE Description

U- Value--BTU/(hr)(ft².°F)

External wall - Solid Brick wall - 230mm thick

0.36

External wall - RCC Concrete wall - 230mm thick

0.48

Partition wall - Solid Brick wall - 230mm thick

0.32

Exposed Roof - RCC 150mm thick+50mm Insulation

0.11

Floor - RCC 150mm thick(Without Underdeck Insulation)

0.36

Ceiling - RCC 150mm thick(Without Underdeck Insulation)

0.29

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 16 of 168

Page 16 of 82

Page 17 of 168

HEAT LOAD ESTIMATION FOR MREP

U-Value calculation 1

External wall - Solid Brick wall - 230mm thick Thickness

Density

mm

kg/m3

Layer

Thermal Conductivit y W/m.K

R-Value

R-Value

(m².K)/W

(hr.ft².°F)/BTU

0.12

0.68

Reference

a

Inside vertical surface resistance (Air film)

b

Cement plaster, sand aggregate

12

1860

0.72

0.02

0.09

ASHRAE Fundamentals Handbook, Table 1

c

Solid Brick Wall

230

1920

0.81

0.28

1.61

ASHRAE Fundamentals Handbook, Table 1

d

Cement plaster, sand aggregate

18

1860

0.72

0.03

0.14

ASHRAE Fundamentals Handbook, Table 1

0.04

0.25

ASHRAE Fundamentals Handbook, Table 10

0.49

2.78

2.04

0.36

R-Value

R-Value

(m².K)/W

(hr.ft².°F)/BTU

0.12

0.68

e

Outside surface resistance U-VALUE

2

ASHRAE Fundamentals Handbook, Table 10

Partition wall - Solid Brick wall - 230mm thick Thickness

Density

mm

kg/m3

Layer

Thermal Conductivit y W/m.K

Reference

a

Inside vertical surface resistance (Air film)

b

Cement plaster, sand aggregate

12

1860

0.72

0.02

0.09

ASHRAE Fundamentals Handbook, Table 1

c

Solid Brick Wall

230

1920

0.81

0.28

1.61

ASHRAE Fundamentals Handbook, Table 1

d

Cement plaster, sand aggregate Inside vertical surface resistance (Air film)

12

1860

0.72

0.02

0.09

ASHRAE Fundamentals Handbook, Table 1

0.12

0.68

0.56

3.16

1.79

0.32

e

U-VALUE

MUMBAI REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 17 of 168

Page 17 of 82

ASHRAE Fundamentals Handbook, Table 10

ASHRAE Fundamentals Handbook, Table 10

Page 18 of 168

HEAT LOAD ESTIMATION FOR MREP

3

External wall - RCC Concrete wall - 230mm thick Thickness

Density

Thermal Conductivity

R-Value

R-Value

mm

kg/m3

W/m.K

(m2.K)/W

(hr.ft2.°F)/BTU

0.12

0.68

Layer a b c

Reference

Inside vertical surface resistance (Air film)

ASHRAE Fundamentals Handbook, Table 10

Cement plaster, sand aggregate

12

1860

0.72

0.02

0.09

ASHRAE Fundamentals Handbook, Table 1

RCC Concrete Wall

230

2400

1.4

0.16

0.93

ASHRAE Fundamentals Handbook, Table 1

d

Cement plaster, sand aggregate

18

1860

0.72

0.03

0.14

ASHRAE Fundamentals Handbook, Table 1

e

Outside surface resistance

0.04

0.25

ASHRAE Fundamentals Handbook, Table 10

0.37

2.10

2.70

0.48

R-Value

R-Value

(m2.K)/W

(hr.ft2.°F)/BTU

0.16

0.92

U-VALUE 4

Exposed Roof - RCC 150mm thick+50mm Insulation Layer

Thickness

Density

mm

kg/m3

Thermal Conductivity W/m.K

Reference

a

Indoor air film, still air, horizontal surface, downward heat flow

b

Underdeck Insulation(Mineral Wool)

50

16-48

0.04

1.25

7.10

ASHRAE Fundamentals Handbook, Table 1

c

RCC

150

2400

1.4

0.11

0.61

ASHRAE Fundamentals Handbook, Table 1

d

Light Weight Aggregate

20

960

0.3

0.07

0.38

ASHRAE Fundamentals Handbook, Table 1

0.04

0.25

ASHRAE Fundamentals Handbook, Table 10

1.77

10.02

0.57

0.10

e

Outside surface resistance U-VALUE

MUMBAI REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 18 of 168

Page 18 of 82

ASHRAE Fundamentals Handbook, Table 10

Page 19 of 168

HEAT LOAD ESTIMATION FOR MREP

5

Floor - RCC 150mm thick(Without Underdeck Insulation) Layer

a b

Thickness

Density

mm

kg/m3

Thermal Conductivity W/m.K

R-Value

R-Value

(m2.K)/W

(hr.ft2.°F)/BTU

0.11

0.62

Indoor air film, still air, horizontal surface, upward heat flow RCC

150

c

Light Weight Aggregate

50

d

Indoor air film, still air, horizontal surface, upward heat flow

ASHRAE Fundamentals Handbook, Table 10

2400

1.4

0.11

0.61

ASHRAE Fundamentals Handbook, Table 1

960

0.3

0.17

0.95

ASHRAE Fundamentals Handbook, Table 1

0.11

0.62

0.49

2.80

2.03

0.36

R-Value

R-Value

(m2.K)/W

(hr.ft2.°F)/BTU

0.16

0.92

U-VALUE 6

Reference

ASHRAE Fundamentals Handbook, Table 10

Ceiling - RCC 150mm thick(Without Underdeck Insulation) Layer

Thickness

Density

mm

kg/m3

Thermal Conductivity W/m.K

Reference

a

Indoor air film, still air, horizontal surface, downward heat flow

b

RCC

150

2400

1.4

0.11

0.61

ASHRAE Fundamentals Handbook, Table 1

c

Light Weight Aggregate

50

960

0.3

0.17

0.95

ASHRAE Fundamentals Handbook, Table 1

d

Indoor air film, still air, horizontal surface, downward heat flow

0.16

0.92

0.60

3.40

1.67

0.29

U-VALUE

MUMBAI REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 19 of 168

Page 19 of 82

ASHRAE Fundamentals Handbook, Table 10

ASHRAE Fundamentals Handbook, Table 10

Page 20 of 168

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

01234678429  7 381 938 797 796

171  2318728 18371



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
W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 W1 m8737 9 op tpuvwx u vwxpt o{puovwx \1z1819m1 j9 2379 231'8-672 |}cd~b€cde€cbb ‚3%=547"7%##))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) B)M K %"%&.:BB:0 A)Q#!M): B)BCV#!B)BCM ƒ ƒ >!"%&5%'#"".:B//0 @)M#!/: B)BCB#!B)BCh ƒ ƒ >!"%&5%'#"".:B//0 /h#!/C B)BhA#!B)Bh@ ƒ ƒ >!"%&5%'#"".:B//0 :: B)Bhh ƒ ƒ >!"%&5%'#"".:B//0 _!'G%&63%;+!!37%##))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ B)M K %"%&./@@V0 h:#!hA B)BhV#!B)BhA ƒ ƒ J&%&5%'#"".:B//0 CQ B)Bhh#!B)BhQ ƒ ƒ J&%&5%'#"".:B//0 `4&"%3+!!3-53#6)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /V#!CM B)BCB ƒ ƒ gES<„.:BBV0-…E!"%&5%'#"".:B//0 %;6/MB6%1)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ::#!QM B)B:@ J&%&5%'#"".:B//0 „"!(%&("!6'#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) hB B)BhB J&%&5%'#"".:B//0 %;6Q1%"%#:CŠg)))))))))))))))))))))))))))))))))))))))))))))))))))))) h:#!hQ BBhB ƒ ƒ J&%&5%'#"".:B//0 73!+&+4#$3!+;3!7%3+%" 4&;(!#%3.‚‹L0.ŒQ0 73!+4&;%;&#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) B)BhQ#!B)BhV ƒ ƒ J&%&5%'#"".:B//0 „?(%&66(!31#1"&-!3667%6))))))))))))))))))))))))))))))))) ƒ ƒ ƒ /)Q K %"%&./@@V0 /V#!:C B)BhQ#!B)BhA ƒ ƒ E&6(&6&###"(!"#.:BBM0 :@ B)Bhh ƒ ƒ E&6(&6&###"(!"#.:BBM0 `4&"%3547"7!%"6-+#53#6))))))))))))))))))))))))))))))))))))))))))))) /VB B)BhA ƒ B)M K %"%&./@@V0 _!'G+!!37!%"6))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ B)M K %"%&./@@V0 53!!"%&6+%33))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) VC#!/hB B)Bhh#!B)BhV ƒ ƒ >4,%&5%'#"".:B//0 "!!54&;)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/VB#!/MB) B)Bh@#!B)BC: ƒ B)M >4,%&5%'#"".:B//0 B)V#!B)M O'!#4'%3#43)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) hCB#!hAB B)BQ:#!B)BQh ƒ L"34#7!%"6)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /CB B)BQ: ƒ ƒ J&%&5%'#"".:B/B0 L!314!'1%&"%#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ /)Q K %"%&./@@V0 &5%'6-%;6("g%&Tˆ‰gabcdecfe
Page 20 of 82

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

°

±iq6[0\6Z029  o²9 21932 u[jx X21i 7 7929 j9 2379 231872 kW1 79l21 2u¾¿ÀÁÂÀÃÄÅx

W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 op tpuvwx u vwxpt o{puovwx \1z1819m1 ƒ B)B:B#!B)B:h ƒ ƒ J&%&5%'#"".:B//0 ƒ ƒ ƒ /)C …E!"%&5%'#"".:B//0 /@#!:V B)Bh@#!B)BCB ƒ ƒ >!"%&5%'#"".:B//0 QV B)Bh@#!B)BCB ƒ ƒ J&%&5%'#"".:B//0 h:#!VC B)Bh@#!B)BCQ ƒ /)/ .`%&5%'#""-(":BB/0 VC#!/:B B)BCQ#!B)BQ: ƒ ƒ .`%&5%'#""-(":BB/0 / : B  # !  / M B B ) B Q :  # !  B ) B V / ƒ ƒ .`%&5%'#""-(":BB/0 ‚3%547"6 %##4'-·/BB#!VBB ))))))))))))))))))))))))))))))))))))))))))))))))) V)C#!M)B B)BQ:#!B)BQQ ƒ ƒ >!"%&5%'#"".:B//0 %##4'-·VBB#!//BB )))))))))))))))))))))))))))))))))))))))))))))))) M#!@)V B)BC@#!B)BQ: ƒ ƒ >!"%&5%'#"".:B//0 '3!6%##4'!"+%33'%,4#4)))))))))))))))))))))))))))))))))))))))))))) :@#!hA B)BhQ#!B)BhV ƒ ƒ >!"%&5%'#"".:B//0 _!'G%&63%;+!!36 %##4'-·@B#!//Q )))))))))))))))))))))))))))))))))))))))))))))))))))) :C#!:V B)BC@ ƒ ƒ N$"%&5%'#"".:B//0 %##4'-·/:Q#!ChB )))))))))))))))))))))))))))))))))))))))))))))))))) :C#!:@ B)BCV#!B)BCM ƒ ƒ N$"%&5%'#"".:B//0 '3!6%##4'!"+%33'%,4#4)))))))))))))))))))))))))))))))))))))))))))) VC B)Bh@#!B)BC: ƒ ƒ N$"%&5%'#"".:B//0 ¸" 4'34#-?5!34%#6))))))))))))))))))))))))))))))))))))))))))))))))))))))))//:#!/h/ B)BVM ƒ /)h <%74&#%3)./@AQ0 VC#!@V B)BVh ƒ ƒ `%&5%'#"".(":BB/0 a¹fcº»c¹¹}µe g333!-("%164&#!!(&+%33'%,4#4)))))))))))))))))))) :V#!C: B)Bh@#!B)BCB ƒ ƒ N+!%&5%'#"".:B//0 ‚3%547"-("%164&#!!(&+%33!"%##4''%,4#4)))))) /V B)Bh@#!B)BC: ƒ ƒ `%&5%'#""F%!'4%#4!&.:B//0 :@#!hA B)Bhh#!B)BhA ƒ ƒ >!"%&5%'#"".:B//0 L!31"#$%&5!% )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ /)Q K %"%&.:BB:0 3!+6&4#1-!(&'33)))))))))))))))))))))))))))))))))))))))))))))))))))) A):#!/B B)BhA#!B)BC: ƒ ƒ N$"%&5%'#"".:B//0 64 6&4#1-'3!6'33-%;6/MB6%1)))))))))))))))))) hB#!Q/ B)B:B#!B)B:@ ƒ ƒ >4,%&5%'#"".:B//0 7 79 28 29 [7 79 |†cfe O7#!T' &#7!%"6)))))))))))))))))))))))))))))))))))))))))))))))))))))))) /@BB B)QA ƒ /)BB …!##%;./@CA0 g &#7!%"6))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) //QB B):Q ƒ B)MC K %"%&.:BB:0 >47"T' &#7!%"6)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /CBB B):Q ƒ B)MC K %"%&.:BB:0 /BBB B)/@ ƒ B)MC K %"%&./@@V0 CBB B)BA ƒ /)MM K %"%&./@@V0 hBB B)BV ƒ /)MM K %"%&./@@V0 ‚1( !"(3%#"7!%"6))))))))))))))))))))))))))))))))))))))))))))))))))))) VCB B)/V ƒ /)/Q K %"%&.:BB:0 J"4&#6#"%&67!%"6.J<S0)))))))))))))))))))))))))))))@#!// VQB ƒ B)// /)MM K %"%&.:BB:0 )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/:)A VQB ƒ B)/: /)MM K %"%&.:BB:0 L31+!!6.6!;3%54"0))))))))))))))))))))))))))))))))))))))))))))/:)A CVB ƒ B)/C /)MM K %"%&.:BB:0 )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/Q)@ QCB ƒ B)/Q /)MM K %"%&.:BB:0 L31+!!6T+!!6(%&3))))))))))))))))))))))))))))))))))))))))))))/@)B CQB ƒ B)/@ /)MM K %"%&.:BB:0 ¸;#%73547"7!%"6 VQB ƒ B)// /)MM K %"%&.:BB:0 $%#$4&;-";3%"6&4#1))))))))))))))))))))))))))))))))/:)A :@B ƒ B):h /)hB ‰+4./@VA0 4&#" 64%#6&4#1)))))))))))))))))))))))))))))))))))/:)A hQB ƒ B)/@ /)hB ‰+4./@VA0 &%43=7%6$%#$4&;))))))))))))))))))))))))))))))))))))))))/:)A CBB ƒ B)/@ /)hB $4&;37%'G"))))))))))))))))))))))))))))))))))))))))))))))))))))@)Q :@B ƒ B)/A /)hB !&66%6&4&;7!%"6))))))))))))))))))))))))))))))))))))/:)A :CB ƒ B):C /):V #43%&63%1=4&(%&3-(3%4&!"%'!#4' :@B B)BQM ƒ B)Q@ 3% 4&%#6(%("7!%"6 CMB B)BA: ƒ /)hM ‰+4./@VA0 $! !;&!7!%"65"! "(3(6(%(" CMB B)BA: ƒ /)/A *%"67!%"6 64 6&4#1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) MBB B)/BQ ƒ /)hB ‰+4./@VA0 $4;$6&4#1-",4'=# ("6;"%6%&6",4';"%6 MMB B)/: ƒ /)hC ‰+4./@VA0 $4;$6&4#1-#%&6%"6=# ("6;"%6)))))))))))))))))))))))))) /B/B B)/CC ƒ /)hC ‰+4./@VA0 L%"#4'37!%"6 3!+6&4#1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) Q@B B)/B: ƒ /)hB ‰+4./@VA0 64 6&4#1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) MBB B)/hQ ƒ /)hB ‰+4./@VA0 $4;$6&4#1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /BBB /)/M ƒ ƒ ‰+4./@VA0 &6"3%1 &#))))))))))))))))))))))))))))))))))))))))))))))))))/Q)@ VCB ƒ /):: /):/ ‰+4./@VA0 ‹%5"7!%"6)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ABB B)BA: ƒ /)MM K %"%&./@@V0 a¼µd½}‡ O7#!T' &#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /@BB ƒ B)BhA ƒ ‹!!6-CBB -/@B ?(!")))))))))))))))))))))))))))))))) ƒ ƒ B)/Q /)hB ‹!!6-6!73-CBB -hBB ?(!"))))))))))))))))))) ƒ ƒ B):/ /)/A ‹!!6-(34&)7%'G"7!%"6)))))))))))))))))))))))))))))))M ƒ ƒ B):Q /)hB aµeµd½ O7#!T' &#-3%((6))))))))))))))))))))))))))))))))))V)C ƒ ƒ B)BhA /)B/ O($%3#"!33464&;))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ B)B:V /)CA O($%3#4&3%#4&;464&;./:)A 760)))))))))))))))))))))) ƒ ƒ B):V /)CA W1 m8737 9 L$&!34'5!% 7!%"6+4#$5%'"-%;6)))))))))))))))))))))))))))))))) ³††‡€´µ}} g333!547"-3!!5433))))))))))))))))))))))))))))))))))))))))))))))))))))) %##4'%((34'%#4!&(#!/BB )))))))))))))))))))))))))))))))))))))) %##4'%((34'%#4!&¶/BB )))))))))))))))))))))))))))))))))))))))))))) +%33%((34'%#4!&-6&(%'G6)))))))))))))))))))))))))))))))))))))) L"34#-?(%&66)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))

Page 21 of 168

08-NOV-2019 SUTHAR KETANBHAI (C360) 21 of 168

Page 21 of 82

Page 22 of 168

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

01234678429  7 381 938 797 796

171  2318728 18371

Æ

X21i 7 7929 j9 2379 231872 kW1 79l21 2u¾¿ÀÁÂÀÃÄÅx W1 m8737 9 *%"67!%"6464&;)))))))))))))))))))))))))))))))))))))))))))))))// ‹!!6-6"!(-:BB ))))))))))))))))))))))))))))))))))))))))):Q ‹!!6-7,3 :BB -3%((6))))))))))))))))))))))))))))))))))))))))))/h :QB -3%((6))))))))))))))))))))))))))))))))))))))))))/@ ‹!!6-(31+!!6-3%((6))))$))-)4)))))))))))))))))))))))))))))@)Q O3 4& -#3-!",4&13- !,"$%#$4&;))))))))))))))))) $!33!+=7%'G6))))))))))))))))))))))))))))))))))))))))))))))))))))))) 4&3%#4&;=7!%"6=7%'G6)))))))))))))))))))))))))))@)Q 5!43=7%'G6))))))))))))))))))))))))))))))))))))))))))))))))@)Q O"'$4#'#"%3.!6%=34 53!%#0;3% 7 79 18291 ¸%(!"=(" %7353#)))))))))))))))))))))))))))))))))):))))))))))))))))))))))))) ¸%(!"Ç%3-:3%1"!5!((6B)AhG;T 53#))))))))))))))))) ¸%(!"Ç%3-(3%#4'543 ))))))))))))))))))))))))))))))))))))))))))))))))))))))) ²797 Ȳ 879 231872 g%"(#%&6"7!&66"#$%&(%6))))))))))))))))))))))))/@ g%"(#%&6"77"(%6.!&=(4'0))))))))))))))))))))))))@)Q L43'%"(#+4#$"77"(%6)))))))))))))))))))))))))@)Q#!/:)A ‰4&!3 T'!"G#43))))))))))))))))))))))))))))))))))))))))))))))))))V)C L¸gT"77"53!!"'!,"4&;)))))))))))))))))))))))))))))))))))))))))))))))))) "77"#43)))))))))))))))))))))))))))))))))))))))))))))))))))))))))):Q #""%RR!)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))):Q 132 .<g$%(#"hh-N%73h0 \ z79 O7#!T' &#$4&;3)))))))))))))))))))))))))))))))))))))))))))))))))))) O($%3#.74# &+4#$4&"#54330))))))))))))))))))))))))))))))))))))))))) O($%3#"!33"!!54&;))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) O($%3#$4&;3)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) S43#=("!!54&;)))))))))))))))))))))))))))))))))))))))))))))))))))))))/B `%#4'%($%3#.$%,1-:BD;"4#0)))))))))))))))))))))))))))))))))))))))) _6#$%#'$)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) _!!54&;53#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) <3%#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/h <#"%+#$%#'$))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ‹!!6$4&;3-(3%4&%&6(3%#4'=543=5%'6))))))))))))))))))))))) 2 31879 231872 g &#(3%#"-%&6%;;";%#))))))))))))))))))))))))))))))))))))))))))) <%&6%;;";%#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))/B ))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))):B ‚1( (3%#")))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ‰4;$#+4;$#%;;";%#)))))))))))))))))))))))))))))))))))))))))))))/h ))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/V !&#%33%#$))))))))))))))))))))))))))))))))))))))))))))))))))))))/@ L"34#%;;";%#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) <%&6%;;";%#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) !&#%33%#$))))))))))))))))))))))))))))))))))))))))))))))))))))))/@ ¸" 4'34#%;;";%#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))

W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 op tpuvwx u vwxpt o{puovwx \1z1819m1 ƒ ƒ B)/: /)/A ƒ ƒ B)/C /)/A ƒ ƒ B)/C /)/A ƒ ƒ B)/M /)/A ƒ ƒ B)/B /):: ƒ ƒ ƒ B)// /)::4 ƒ ƒ B)h: /)hC ƒ ƒ B)Q: ƒ :QBB /)B ƒ B)MC ƒ ƒ B)B// ƒ ƒ ƒ B):/ ƒ ƒ ƒ …;34;473 ƒ //B ƒ B)C: ƒ …E
L"34#(3%#"))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) L3(7!%"6!"(%("(3%#"))))))))))))))))))))))))))))))))))))))))))))))))))) <%&6T' &#(3%#"-'!&64#4!&6)))))))))))))))))))))))))))))))))))))))) <%&6T' &#T34(3%#"-'!&64#4!&6)))))))))))))))))))))))))))))))) <%&6T;1( .hÇ/0(3%#"-'!&64#4!&6)))))))))))))))))))))))))))))) 2 98n 231872 Éc‡†dfº€Êdµb‡ S"4'G-54"6'3%1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) :CBB ::CB :BMB /@:B

ƒ B)Ch B)QM /)/Q ƒ ƒ ƒ B)/@ B)B@ /):B ƒ B)BA ƒ B)A: ƒ ƒ B)hM B)CV A:B A:B ƒ B):: B)M/ ƒ B)/C B):B B):Q B):V B)hB B)BM B)/@ B)BA B)Vh B)CM B)VQ

B)BhA ƒ ƒ ƒ B)B:A B)BAM B)BQ@ ƒ ƒ ƒ B)BB@ ƒ B)/VV ƒ B)B/h B)B:V ƒ ƒ ƒ ƒ B)BMh ƒ ƒ B)B:h ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

/)BB ƒ ƒ ƒ /)Q/ /):V /)CA ƒ ƒ ƒ /):V ƒ /)hB B)MC B)MC B)MC ƒ ƒ B)BQV B)BVV ƒ /)hC B)MC ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

/):/#!/)CA /)BA#!/)hB B)@:#!/)/: B)M/#!B)@M

ƒ ƒ ƒ ƒ

ƒ ƒ ƒ B)MB

08-NOV-2019 SUTHAR KETANBHAI (C360) 22 of 168

Page 22 of 82

gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 ƒ ƒ gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 ¸%3!"./@MM0 ¸%3!"./@MM0 ¸%3!"./@MM0 ¸%3!"./@MM0

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

i±

±iq6[0\6Z029  o²9 21932 u[jx X21i 7 7929 j9 2379 231872 kW1 79l21 2u¾¿ÀÁÂÀÃÄÅx

W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 op tpuvwx u vwxpt o{puovwx \1z1819m1 /AVB B)A/#!B)MQ ƒ ƒ ¸%3!"./@MM0 /VBB B)V/#!B)AC ƒ ƒ ¸%3!"./@MM0 /CCB B)Q:#!B)V: ƒ ƒ ¸%3!"./@MM0 /:MB B)Ch#!B)Qh ƒ ƒ ¸%3!"./@MM0 //:B B)hV#!B)CQ ƒ ƒ ¸%3!"./@MM0 ƒ ƒ B)/C B)MM _!+31%&6O3;"&./@hA0 ƒ ƒ B):B ƒ _!+31%&6O3;"&./@hA0 ƒ ƒ B):A ƒ _!+31%&6O3;"&./@hA0 ƒ ƒ B)hh ƒ _!+31%&6O3;"&./@hA0 ƒ ƒ B)h@ ƒ _!+31%&6O3;"&./@hA0 ƒ ƒ B)CC ƒ _!+31%&6O3;"&./@hA0 MBB B):B ƒ ƒ K %"%&./@@V0 AAB B):: ƒ ƒ K %"%&./@@V0

W1 m8737 9

g3%1#43-$!33!+ /'336())))))))))))))))))))))))))))))))))))))))))))))))))))))))))AQ ))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/BB :'336())))))))))))))))))))))))))))))))))))))))))))))))))))))/QB )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))):BB )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))):QB h'336())))))))))))))))))))))))))))))))))))))))))))))))))))))hBB ‰4;$#+4;$#7"4'G)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ˆdÌfb€}†Ì~‡5-; ‰4#!&%;;";%# ƒ ·:BB -/V)hG;-::BBG;Th'!&'"#-:'!"))))))))) ƒ +4#$("34#=54336'!")))h))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ·hBB -:QG;-::BBG;T '!&'"#-:'!")))))))))))) ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ …!" %3=+4;$#%;;";%#.%&6%h&6;"%,30 ƒ ·:BB -/VG;-:/BBG;T '!&'"#-:!"h'!"Í ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!"h)))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ ·hBB -::)AG;-:BBBG;T '!&'"#-:'!"))))))) ƒ `64 =+4;$#%;;";%#.'! 74&%#4!&h!5&!" %3%&634;$#+4;$#%;;";%#0 ƒ ·:BB -/hG;-/QQB#!/MBBG;T '!&'"#-:!"h'!" ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!")))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$!366=„L<=54336.7%60'!"))))))))))))))))))))) ƒ ƒ +4#$!366„L<4&"#4&'!")))))))))))))))))))))))))))) ƒ ƒ ‰!+= %%;;";%#.?(%&66$%:3-'3%1-3%#!"3%;-( 4'0 ƒ ·/QB -A/T:G;-/CBBG;T '!&'"#-:!"h'!" ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!"))))))))))))):))))))))))))))))))))))) ƒ ƒ ƒ :BB -M#!/BG;-//QB#!/hMBG;T '!&'"#))))) ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!")))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$!366=„L<=54336.7%60'!"))))))))))))))))))))) ƒ ƒ +4#$ˆ>5!% =54336'!"))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$!366„L<4&"#4&'!")))))))))))))))))))))))))))) ƒ ƒ ƒ hBB -/VG;-/CBBG;Th-'!&'"#-:!"h'!")))) ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!")))))))))))))))))))))))))))))))))))) ƒ ƒ <#!&-34-!"%&6))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) :MMB /B)C Î%"#R4#4'%&6%&6#!&)))))))))))))))))))))))))))))))))))))))))))))))))))))) :QVB V): ::CB h)CV /@:B /)MM g%3'4#4'-6!3! 4#4'-34#!&-%"73-%&6;"%&4#))))))))))))) :MMB C)hh :QVB h)/A ::CB :)h/ /@:B /)Q@ /VBB /)/Q ‚1( (%"#4#4!&#43 AQ71hBB71AVB -!346)))))))))))))))))))))))))))))))))))))))) ƒ ƒ C'33))))))))))))))))))))))))))))))))))) ƒ ƒ /BB71hBB71AVB -h'33)))))))))))))))))))))))))))))))))))) ƒ ƒ ‰4#!&)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) :CBB B)QA :VBB B)@h ˆdÌfb‡4 <%&6%&6;"%,3!"#!&%;;";%#'!&'"#))))))))))))))))))))) :CBB /)C#!:)@ .'!&'"#+4#$¶QBD2%"#R!"2%"#R4#%&6$%, ::CB /)h#!:)V '!&6'#4,4#44&$4;$"&6!5"%&;0 :BMB /)B#!/)@ ‰!+= %%;;";%#!"34#!&'!&'"#))))))))))))))))))))))) /@:B B)@#!/)h ?(%&66$%3-'3%1-!"3%#9?(%&6h63%;9'4&6"9 /VBB B)VM#!B)M@ ( 4'.+4#$6&4#1(#!/VBBG;T 09'!"4%.%&66 /:MB B)CM#!B)Q@ '!&'"#$%,'!&6'#4,4#44&$4;$"&6!5"%&;0 @VB B)hB#!B)hV VCB B)/M

Page 23 of 168

ƒ ƒ B)hA ƒ ¸%3!"./@MM0 ƒ ƒ B)VQ ƒ ¸%3!"./@MM0 B):B#!B)/A B)@: ¸%&‚ ./@MQ0 B)hQ ƒ ¸%&‚ ./@MQ0 B)hC#!B):C ƒ ¸%3!"./@MM0 B):/A B)@: ¸%3!"./@MM0 B)hB#!B):: ƒ ¸%&‚ ./@MQ0 B)VQ#!B)C/ ƒ ¸%&‚ ./@MQ0 B)QM ƒ ¸%&‚ ./@MQ0 B)QV ƒ ¸%&‚ ./@MQ0 B)CA ƒ ¸%&‚ ./@MQ0 B)hC#!B):@ ƒ ¸%&‚ ./@MQ0 B)AC ƒ ¸%&‚ ./@MQ0 B)Qh ƒ ¸%&‚ ./@MQ0 B)QV#!B)hh B)MM ¸%&‚ ./@MQ0 /):B#!B)AA ƒ ¸%&‚ ./@MQ0 B)@h#!B)V@ ƒ <$#%3)./@A@0 B)MQ ƒ <$#%3)./@A@0 B)A@ ƒ <$#%3)./@A@0 B)V: ƒ <$#%3)./@A@0 B)CV#!B)CB ƒ ¸%&‚ ./@MQ0 /)V#!/)/ ƒ ¸%&‚ ./@MQ0 /)B ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ B)MM ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ B)MM ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 B)::: B)A@ _!+31%&6O3;"&./@hA0 B):hM ƒ _!+31%&6O3;"&./@hA0 B):@C ƒ _!+31%&6O3;"&./@hA0 ƒ B)MC K %"%&.:BB:0 ƒ B)MC K %"%&.:BB:0 ƒ ƒ ¸%3!"./@MM0 ƒ B)MB#!/)BB¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ B)MC ¸%3!"./@MM0 ƒ B)MC ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0

08-NOV-2019 SUTHAR KETANBHAI (C360) 23 of 168

Page 23 of 82

Page 24 of 168

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

01234678429  7 381 938 797 796

171  2318728 18371

ii

X21i 7 7929 j9 2379 231872 kW1 79l21 2u¾¿ÀÁÂÀÃÄÅx

W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 W1 m8737 9 op tpuvwx u vwxpt o{puovwx \1z1819m1 ‚1( T547"'!&'"#.MA)QD;1( -/:)QD+!!6'$4(0 MBB B):C ƒ B)MC _!+31%&6O3;"&./@hA0 g &#T34-!"#%"-%&6#''!))))))))))))))))))))))))))))))))))))))))) /@:B /)CB ƒ ƒ ¸%3!"./@MM0 /VBB B)@A ƒ ƒ ¸%3!"./@MM0 /:MB B)VQ ƒ ƒ ¸%3!"./@MM0 L"34#-," 4'34#-%&6(!31#1"&7%6))))))))))))))))))))))))) MBB B):V#!B):A ƒ ƒ ¸%3!"./@MM0 VCB B):B#!B):: ƒ B)Vh#!B)@V¸%3!"./@MM0 CMB B)/V ƒ ƒ ¸%3!"./@MM0 h:B B)/: ƒ ƒ ¸%3!"./@MM0 >!% '!&'"#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /@:B B)AQ ƒ ƒ ¸%3!"./@MM0 /VBB B)VB ƒ ƒ ¸%3!"./@MM0 /:MB B)CC ƒ ƒ ¸%3!"./@MM0 //:B B)hV ƒ ƒ ¸%3!"./@MM0 >!% '!&'"#%&6'333%"'!&'"#)))))))))))))))))))))))))))))))) @VB B)hB ƒ ƒ ¸%3!"./@MM0 VCB B):B ƒ ƒ ¸%3!"./@MM0 h:B B)/: ƒ ƒ ¸%3!"./@MM0 O"%#6'!&'"#.!,&=6"460))))))))))))))))))))))))))))))))))))))))))))ChB#!MBB B):B ƒ B)MC K %"%&./@@V0 L!31#1"&'!&'"#.!,&=6"460)))))))))))))))))))))))))))))))))))))):QQ#!MBB B)hA ƒ B)MC K %"%&./@@V0 L!31 "'!&'"#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /@QB /)VC ƒ ƒ K %"%&./@@V0 ::BB /)Bh ƒ ƒ K %"%&./@@V0 L!31 "' &#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /MAB B)AM ƒ ƒ K %"%&./@@V0 <3%;'!&'"#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) @VB B):: ƒ ƒ N!3!G4%&#%3./@AB0 /:MB B)h: ƒ ƒ N!3!G4%&#%3)./@AB0 /VBB B)Ch ƒ ƒ N!3!G4%&#%3)./@AB0 :BBB /):h ƒ ƒ N!3!G4%&#%3)./@AB0 t

./:D!4#"'!&# ƒ Ñ Ñ /)VhG ‹43G./@A@0 ÏcfeІ†e‡ J%G))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))VVB#!AQB B)/V#!B)/M ƒ ƒ g%"6&%%&6S473./@MA0 S4"'$))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))VMB#!A:Q B)/A#!B)/M ƒ ƒ g%"6&%%&6S473./@MA0 `%(3)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))VhQ#!ABB B)/V#!B)/A ƒ ƒ g%"6&%%&6S473./@MA0 O$)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))V/Q#!VAB B)/Q#!B)/V ƒ ƒ g%"6&%%&6S473./@MA0 a†´bІ†e‡ Ñ Ñ Ñ /)VhG ‹43G./@A@0
%¸%3 %"5!"%&# ("%#"!5:CŠg)_("&#%#4,,%35!"6"1%#"4%3%"4&#&66 4¸4&13('454'$%#Õ/)BGÖT.G;UK0 %64;&.&!#('454'%#4!&0,%35!"%#"4%34&&!" %3)N$" %3,%3!54&3%#4&; 8<O6% ./@A/0-`%'‰%&./@C/0-%&6‹43G./@A@0)g!&6'#4,4#1,%3

%#"4%3 %16455"5"! 64;&,%36(&64&;!&4&=4#("!("#4.);)-6&4#1%&6 !4#"'!&#&#-!"4&#%#4!&-#')0%&6 %&5%'#"4&;,%"4%7434#1)>!"("!("#4!5('454' ("!6'#-,%3((34671%&5%'#""!"&74%6##) 7<1 7!3 Ó%3!6#!"("&##$" %3'!&6'#4,4#1) 'P! &!#4&'36(%("7%'G4&;%&65%'4&;-45%&1)‹$"4&3%#4!&5!" 7!&6%"1."53'= #4,!"!#$"+40!5%4"(%'-N%73:%&6h5!"4&3%#4&;,%3!5%4"(%'+4#$%(("!= ("4%#55'#4, 4##%&'%&6# ("%#"'!&64#4!&!5(%') 6g!&6'#4,4#1,%"4+4#$547"64% #".g$%(#":Q0)S%##-73%&G#-%&63!!=5433 4&= "%3547"4&3%#4!&%" %&5%'#"6#!%'$4,('4546_=,%3-#$!#'! !&!5 +$4'$%"34#64&#$#%73)S'%!56455"&'4&%&5%'#"4&;("!'%&6%#"4= %3-#$("!6'##$4'G&-6&4#4-%&6#$" %3'!&6'#4,4#4,%"1!,"'!&46"%73 "%&;5!"%('4546_=,%3) E&3%#4&; ,%3!5%'!#4'%3#43,%"1-6(&64&;!&6&4#1!57!%"6%&6!&#1(-4R-%&6 6  ( # $  ! 5  (  "5!"%#4!&) 5¸%35!"5331;"!#673!'G %17%(("!?4 %#64&;,%35!"'!&'"#+4#$4 43%" &4#6&4#1) ;¸%3 5!"'!&'"#73!'G%&6'!&'"#%"%#!4#"'!&#&#"("&#%#4,!5&!" %3) $¸%35!"#%3!",4&13464&;%((346!,"53%#"5%',%"1+4631-6(&64&;!&,= 3%#4!&!5#$%4"(%'7&%#$#$464&;9+$#$"%4"(%'4"53'#4,!"&!&"53'#4,9%&6 !&#$4'G&-#1(-%&6%((34'%#4!&!54&3%#4&;7%'G4&;=7!%"66)¸%3%"%,"%;5!" %64;&;46-%&6+"!7#%4&65"! ,"%3;%"66$!#7!?##.O
Page 24 of 82

34#6%"5!"$%##"%&5"%'"!#$;"%4&)N$" %3'!&6'#4,4#1!5+!!6,%"4 34&%"31+4#$6&4#1-%&66&4#1"%&;34#6%"#$!&!" %3315!&65!"+!!6 ('4;4,&)E56&4#1!5+!!6('44&!#G&!+&- %&'!&6'#4,4#1 ,%3)>!"?#"%(!3%#4!&#!!#$"!4#"'!&#&#-#$5!33!+4&; (4"4'%32%= #4!&6,3!(671‹43G./@A@0%176Ç ß=/=)=M=A==C==Ý===/=B==Ü=:==Þ==Q==)A==Q=h===Ý==/==B=Ü=C==É==à==×= ~Õ B)/A@/Þ= /ÞB)B/É +$"×46&4#1!5!4#+!!64&G;T h-%&6É4!4#"'!&#&#4&("'&#) G>"! ‹43G./@A@0-%& (4"4'%32%#4!&5!"('454'$%#!5 !4#+!!6%# :CŠg4%5!33!+Ç Ì¹ Õ =ß=B=ß)=:/=@==Þ@==BÞ==)B=B=/)=B=É/==Éà===àÞØ̹ +$"Ø̹%''!&#5!"$%#!5!"(#4!&%&646&!#671 Ø̹ á Éß/)@:/Ý/BÜhÜh)/VMÝ/BÜQÉà +$"É4!4#"'!&#&#4&("'&#71%) 3S3%&G(%'4&"5"&''!3 &4&64'%#$4#!"4'%3,%35"! (",4!,!3=  !5ÙaÏÚÙۀÏcde††~)
Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

±

±iq6[0\6Z029  o²9 21932 u[jx

X21° Xn7m2628193XÈ182 9 m37r73nl21  z 8[ 7 4tpuvwx

X21i± [8z2m1²7 1zz7m7193 p\1 7 329m1

[8z2m1Z73329m14ä \1z1m37r1 W781m37 9 Ò ä98å1z±1Æm±37r1 äå±± äå±±æ z 0123² ã ç y ç y ç yÂ

\1m 19 1 l21 z 8W1 792 Ò 82\291 Y ã 07Èm B)V#!:)Q B)AM :):Q B)@#!:)Q /)VC :):Q B)@#!/)V /)/: /)QV B)@#!:)Q B)@Q :):Q

 737 9 z [8z2m1 j9 8 *!"4R!&#%3 ˆ(+%"6 @):V B)// Q)/A B)/@ C)h: B):h <3!(4&;%#CQŠ ˆ(+%"6 @)B@ B)// Q)BB B):B C)/Q B):C %_%!&%73 ,%35!"+$&&!4#=!"!43=('454'6%#%%"%,%43%73) *!"4R!&#%3 M):@ B)/: C):B B):C h)hQ B)hB 7`!6"%#31'!&",%#4 ,,%35!" 4&4  $%#3!#$"!;$!43.);)-4&!43 ¸"#4'%3 $%#?'$%&;"!"%"#$='!&#%'#'!!34&;'%3'3%#4!&0)¸%3%"5"! <%3! !&%&6 <3!(4&;%#CQŠ P!+&+%"6 A)QB B)/h h)C/ B):@ :)QV B)h@ `%"3!+./@M@0) *!"4R!&#%3 P!+&+%"6 V)/h B)/V :)/B B)CM /):Q B)MB '`!6"%#31 '!&",%#4,,%35!"%?4  $%#3!#$"!;$!43.);)-4&(%G ]3 8.%&1(!4#4!&0 ç¿ y¿ +4&#"$%#3!'%3'3%#4!&0)¸%3%"5"! <%3! !&%&6`%"3!+./@M@0) ‹4 & 6  . 5 ! "  +4 & #  " 0  O& 1 h C)B B)BhB ƒ ƒ ƒ ƒ X21Æ Xn7m2628193XÈ182 9 m37r73nl21  %#V)AT z 8\ mo 4tpuvwx ‹4&6.5!" "0 O&1 ::)A B)BCC ƒ ƒ ƒ ƒ %#h)CT Ò 82\291 è†b‡Ç L 4'-#55-!7464%& B)Q#!:): /)<":5%''!&6'#%&'¼µ%&6¼†%"64&‹T. :UK09"4#%&'Úµ%&6چ4& . UK0T‹) S%%3# B)Q#!:)V :)…!"5%'$%7!#$%&%4"(%'"4#%&',%3%&6%"5%'"4#%&',%3) <$%3 B)@#!C)B h)g!&6'#%&'%"5!""5%'!5#$#%#6 4##%&'5%'4&;,4"#%373%'G7!61"= "!&64&;%#% # ("%#"%% 74&#%4")¸%37%6!&"5%'T%4"# ("%= ‚"%&4# /)A#!C)h #"6455"&'!5Q)VK%&6"5%'# ("%#"!5:/Šg) ‰4#!&-6!3! 4#-%"73 /):#!C)h C)<g$%(#"C5!"!"6#%4364&5!" %#4!&) Î%"#R!%&6#!& /)C#!A)M Q)g!&6&%#'%&$%,4;&454'%&#55'#!&"5%' 4##%&'.N%73:0)O3!-!?4=

<%&6 <43# g3%1 ‰!% 

O$%#53!+#$"!;$!43- !4#"#&6#! !,%+%15"! #$$%#!"')N$4!4#"4;"%#4!&("!,464&4#4%3%#"%&= (!"#!5$%#-7#4#%3!6"4#$!43%68%'&##!#$$%#!"'-#$ 3!+"4&;#$%((%"&##$" %3'!&6'#4,4#14&#$%#R!&!5!43) N1(4'%331-+$&!#$"5%'#!"%"$36'!&#%&#-~4&'"%+4#$ !4#"'!&#&#%&6+4#$6"16&4#1!5%!43-7#6'"%+4#$ 4&'"%4&;!";%&4''!&#&#!5%!43%&65!"&45!" ;"%6%#4!&%&6 "!&66!43;"%4&.7'%;"%4&=#!=;"%4&'!&#%'#%""6'60) N$~!5%5"!R&!43%17$4;$"!"3!+"#$%&#$%#!5#$%  &5"!R&!43.7'%#$'!&6'#4,4#1!54'4$4;$"#$%&#$%#!5 +%#"7#3!+"#$%&#$%#!5#1(4'%3!43;"%4&0)P455"&'4&~ 73!+ !4#"'!&#&#!5A#!MD%"24# %33)O#%(("!?4= %#31/QD!4#"'!&#&#-~%1,%"1(#!hBD5"! &5"!R& ,%3) ‹$&'%3'3%#4&;%&&%3&";1-'$!!,%3#$%#"("= &##1(4'%3%&4#'!&64#4!&)E&'34%#+$";"!&65"R4&; 44;&454'%&#-%''"%#$%##"%&5"43%#4!&$!364&'36#$ 55'#!5#$3%#&#$%#!554!&!5+%#")„&";1"3%66"4&; #$4($%'$%&;4;&454'%"#%"6#$("!;"!5#$5"!#5"!&# 4&!4#!43) >!"5"#$"4&5!" %#4!&-g$%(#"/A-+$4'$4&'36% #$!65!"#4%#4&;$%#3!#$"!;$5!&6%#4!&)

[â\²6Z²jY ]Z²²jjZÒX[p \Z[j[X6ÒZ[

O?(3%4&64&g$%(#":Q-#$!,"%33#$" %3"4#%&'!5%& % 731'! ("44#"5%'=#!="5%'#$" %3"4#%&'ڇ %&6#$"5%'543 "4#%&'7#+&#$% 731F"5%' %&6#$4&#"4!"%&6?#"4!"&,4"!& &#.Ú%&6Ú0)N%73/B ;4,#1(4'%3,%35!"#$"5%'543 '!554µ'4&#¼†µ%&6¼†%&6 #$4""'4("!'%3-#$"5%'"4#%&'Úµ€%&6چ)O$!+&-#$ 4&6!!",%36(&6!&(!4#4!&!5#$"5%'-64"'#4!&!5$%# #"%&5"-%&6#$"5%'F3!&;=+%, 44,4#1)J#6!!"-#$,%3= 6(&6!&%4"(6%&6#$"5%'F3!&;=+%, 44,4#1) N%73/B"53'##%&6%"64#%#4!&-+4#$%&% 6.%(("!?4= %#04&#"4!""5%'# ("%#""("&#%#4,!5+%33!""!!5 % 734)>!"4#%#4!&#$%#6,4%#7#%%3315"! #%&6%"6

Page 25 of 168

6%#4!&-'!""!4!&-%&6%'' 3%#4!&!56#%&664"#'%&6"% %#4'%3314&'"%"= 5%' 4##%&')„ 4##%&',%3!5B)BQ$!36!&3176+$"$4;$31"53'#4, "5%''%&7%4&#%4&6!,"#$",4'345!5#$% 731)

X21ii Z8 129[8z2m1²7 1zz7m7193 p\1 7 329m1

 737 9 z[8z2m1 j9 8 *!"4R!&#%3-3!(4&;#!CQŠ ¸"#4'%3-3!(4&;71!&6CQŠ ]3 8

W781m37 9 z ç4 y4 0123² ã tpu vwx u vwxpt ˆ(+%"6 /B B)/ P!+&+%"6 V B)/A O&164"'#4!& A)A B)/h :Q B)BC

'!&64#4!&-4&'364&;4&#"4!""5%'# ("%#"5!"5&#"%#4!& 1# -O<*_O„./@@M0!",%35"! g$%(#"/Q#!6#"= 4&#$"5%'543 '!554'4&#T"4#%&')N%73//34##$ #%&6%"6"5%'543 '!554'4&#,%364&„"!(%&#%&= 6%"6)

]WZ[6ÒW[X6ÒW6\W[

O<*_O„):B/B)„&";1#%&6%"65!"74364&;?'(#3!+="4"46%3 74364&;)O…<ETO<*_O„TE„<abcdecfe@B)/=:B/B) O<*_O„):BB@)g"4#"4%5!" !4#"='!&#"!364;&4&74364&;)O…<ET O<*_O„abcdecfe€/VB=:BB@) O
08-NOV-2019 SUTHAR KETANBHAI (C360) 25 of 168

Page 25 of 82

08-NOV-2019

Page 26 of 82

08-NOV-2019 SUTHAR KETANBHAI (C360)

Page 27 of 82

Page 28 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-3.1 ETD CALCULATION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 28 of 168

Page 28 of 82

HEAT LOAD ESTIMATION FOR VRMP Equivalent Temp. Difference Calculations HVAC Contractor- Advance Ventilation Pvt. Ltd. Daily Range in deg.F

Summer (˚F)= 20.52

Monsoon (˚F)= 15.66

Project: Vizag Refinery Modernization Project DBT in deg.F SUMMER

MONSOON

Page 29 of 168

OUTDOOR

91.9

INDOOR

78.8

DIFFERENTIAL

13.1

OUTDOOR

87.1

INDOOR

78.8

DIFFERENTIAL

8.3

OUTDOOR

64.9

INDOOR

78.8

DIFFERENTIAL

-13.9

WALL

Wt. of Wall(lb/sq.ft)

ETD (deg.F)

N

100

4

-2.12

2

NE

100

10

-2.12

8

E

100

18

-2.12

16

SE

100

18

-2.12

16

S

100

16

-2.12

14

SW

100

14

-2.12

12

W

100

12

-2.12

10

NW

100

6

-2.12

4

ROOF

80

32

-2.12

30

WINTER

CORRECTION FACTOR SUMMER

NET ETD(deg.F)

Design Inside Condition: Temp (˚F):

78.8

RH (%):

50

Remarks

ISHRAE Handbook Table1.21/1.22/1.23

MONSOON N

100

4

-4.55

-1

NE

100

10

-4.55

5

SE

100

18

-4.55

13

E

100

18

-4.55

13

S

100

16

-4.55

11

SW

100

14

-4.55

9

W

100

12

-4.55

7

NW

100

6

-4.55

1

ROOF

80

32

-4.55

27

ISHRAE Handbook Table1.21/1.22/1.23

# Taken reference of Visakhapatnam

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 29 of 168

Page 29 of 82

HEAT LOAD ESTIMATION FOR VRMP Equivalent Temp. Difference Calculations HVAC Contractor- Advance Ventilation Pvt. Ltd. Daily Range in deg.F

Summer (˚F)= 20.52

Monsoon (˚F)= 15.66

Project: Vizag Refinery Modernization Project DBT in deg.F SUMMER

91.9

INDOOR

75.2

DIFFERENTIAL

16.7

INDOOR

75.2

Design Inside Condition: Temp (˚F):

DIFFERENTIAL

11.9

RH (%):

OUTDOOR

64.9

INDOOR

75.2

DIFFERENTIAL

-10.3

WALL

Wt. of Wall(lb/sq.ft)

ETD (deg.F)

N

100

4

1.48

5

NE

100

10

1.48

11

E

100

18

1.48

19

SE

100

18

1.48

19

S

100

16

1.48

17

SW

100

14

1.48

15

W

100

12

1.48

13

NW

100

6

1.48

7

ROOF

80

32

1.48

33

MONSOON

Page 30 of 168

OUTDOOR

WINTER

OUTDOOR

87.1

CORRECTION FACTOR SUMMER

NET ETD(deg.F)

75.2 50

Remarks

ISHRAE Handbook Table1.21/1.22/1.23

MONSOON N

100

4

-0.95

3

NE

100

10

-0.95

9

SE

100

18

-0.95

17

E

100

18

-0.95

17

S

100

16

-0.95

15

SW

100

14

-0.95

13

W

100

12

-0.95

11

NW

100

6

-0.95

5

ROOF

80

32

-0.95

31

ISHRAE Handbook Table1.21/1.22/1.23

# Taken reference of Visakhapatnam

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 30 of 168

Page 30 of 82

Page 31 of 168

HEAT LOAD ESTIMATION FOR VRMP

3.2 HEAT GAIN FROM PEOPLE

From ISHRAE HVAC data book Table- 1.24

Degree of activity

Typical application

Office worker

Office, Hotels, Apts., college Dept. Retail or Variety Store

Standing, walking slowly

Room Dry-bulb temperature (75 deg.F)

Metabolic rate(adult male Btu/hr) 475

Btu/hr Sensible

Btu/hr Latent

550

245

205

SOLAR HEAT GAIN FACTOR (Btu/Hr)(Sq.ft ) AT 200 EXPOSURE

SUMMER (MAY21) At 4pm*

MONSOON (AUG 24) At 4pm*

NORTH

23

11

NORTH EAST

12

11

EAST

12

11

SOUTH EAST

12

11

SOUTH

12

11

SOUTH WEST

85

113

WEST

163

165

NORTH WEST

138

118

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 31 of 168

Page 31 of 82

08-NOV-2019

Page 32 of 82

08-NOV-2019

Page 33 of 82

08-NOV-2019

Page 34 of 82

Page 35 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-4 HEAT LOAD CALCULATION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 35 of 168

Page 35 of 82

Page 36 of 168

HEAT LOAD ESTIMATION FOR VRMP

4.1.1 SUMMARY SHEET FOR SUBSTATION 86-CT BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 36 of 168

Page 36 of 82

Page 37 of 168

PROJECT : VIZAG REFINERY MODERNIZATION PROJECT OWNER : HINDUSTAN PETROLEUM CORPORATION LIMITED

CONSULTANT: ENGINEERS INDIA LIMITED

SUMMARY SHEET FOR SUBSTATION SS-86 (COOLING TOWER) BUILDING

Date: 03.10.19

J9

B15

B18

I108

I107

I109

Winter Load ( KW)

I110

Monsoon Heating ( KW )

I111

78.8 78.8 78.8 78.8

50.0 50.0 50.0 50.0

2.0 2.0 1.5 0.0

5605 590 120 0

21980 544 288 0

74.39 4.29 1.30 1.37

-11.16 -7.04 -0.68 0.00

11.39 1.18 0.21 0.00

-17.08 -1.80 -0.37 0.00

112000.00

4.00

6316

22812

81.35

-18.87

12.78

-19.25

44000 9000 1000 1000 0 0 0 55000.00

3.0 0.0 4.0 3.0 0.0 0.0 0.0 10.00

1038 346 487 249 326 158 0 2603

9033 2034 918 632 562 348 0 13526

23.73 5.92 4.71 2.70 3.03 1.62 1.55 43.27

6.96 -0.33 -5.97 -2.91 -4.68 -2.35 0.00 -9.29

2.66 0.99 0.70 0.58 0.74 0.35 0.00 6.02

-3.16 -1.05 -1.48 -0.76 -0.99 -0.48 0.00 -7.93

167000.00

14.00

8919

36338

124.62

-28.16

18.80

-27.18

SUBTOTAL(A) SECOND FLOOR RACK ROOM UPS ROOM TECH ROOM ENGINEER ROOM LOBBY 1 LOBBY 2 AHU ROOM SF SUBTOTAL(B)

5 6 7 8 9 10 11

TOTAL(A+B)

14020.92 78.85 39.36 38.69 18.93 99.29 19.84 39.41

55.89 36.87 41.07 55.89 15.81 48.45 41.07

4221.16 1404.61 1542.25 1011.29 1569.72 961.35 1571.88 12282.25 26303.17

9.84 9.84 12.63 9.84 12.46 9.84 19.96

08-NOV-2019 SUTHAR KETANBHAI (C360) 37 of 168

Page 37 of 82

78.8 78.8 78.8 78.8 78.8 78.8 78.8

50.0 50.0 50.0 50.0 50.0 50.0 50.0

1.5 1.5 1.5 1.5 1.0 1.0 0.0

Humidifier ( Kw)

H9

0.0 0.0 4.0 0.0

Unit Ref. Load

B58

Dehumidified Unit CFM

Fresh air ACPH

B59 111000 0 1000 0

fresh air CFM

Room Design RH in %age

D11 14.76 22.25 14.76 18.97

Room Design Temp. in deg. F

B12 11391.97 795.63 326.46 1506.85

Height ( Ft )

C11 50.59 20.57 16.73 38.61

Floor Area(sqft)

B11 218.42 38.69 19.52 39.03

Width(Ft)

Occup. (Persons)

B10 FIRST FLOOR SWITCHGEAR HALL SWITCHGEAR HALL GIS PANELS OPERATOR ROOM AHU ROOM FF

Eqip. Load(W)

1 2 3 4

Length(Ft)

S.no

Area Description

Rev. 00

Page 38 of 168

HEAT LOAD ESTIMATION FOR VRMP

4.1.2 CALCULATION SHEET FOR SUBSTATION 86-CT BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 38 of 168

Page 38 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT SWITCHGEAR HALL

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

SWITCHGEAR HALL

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

218.42

50.59

14.76

MONSOON

DESIGN CONDITIONS

ROOM AREA

11391.97 Sq.ft

INDOOR

ROOM VOLUME

168145.44 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

2.00

17.00

cfm/per

5604.85

Cfm @ AC/Hr

0.00

Cfm @ Occup

FRESH AIR

5604.85 Cfm Selected

GLASS AREA

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

73.7 -17

BF

0.12 Occupant Heat

Sens

245.00

1-BF

0.88

Lat

205.00

N

NE

E

SE

S

SW

W

NW

8.53

0.00

0.00

0.00

8.53

0.00

0.00

0.00

H

1.97

0.00

0.00

0.00

1.97

0.00

0.00

0.00

QTY

Gr/LB 150.0

50.0

L

All Glass 67.13

2.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

33.57

0.00

0.00

0.00

33.57

0.00

0.00

0.00

Partition

L

156.62

0.00

0.00

0.00

138.74

0.00

0.00

0.00

177.12

H

14.76

14.76

14.76

14.76

14.76

14.76

14.76

14.76

14.76

0.00

0.00

0.00

2014.30

0.00

0.00

0.00

2614.29

AREA WALL AREA

WINTER

RH

1

NETT AREA 2278.14

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Area

U

Sum

Mon

Win

Sum

Mon

Win

34

1.00

23

11

0

772

369

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

34

1.00

12

11

0

403

369

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

N

S

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

2278

0.36

2

-1

-14

1542

-451

-11367

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

2014

0.36

14

11

-14

10065

8303

-10051

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

S

Trans. Gain-Except Wall & Roof All Glass

67

1.13

13

8

-14

997

628

-1051

Partition

2614

0.32

8

3

-9

6810

2744

-7412

Ceiling

2028

0.29

8

3

-9

4788

1929

-5212

11392

0.36

8

3

-9

33383

13452

-36336

Floor

Internal Heat Occupants (Nos.)

0

245

0

0

0

Power (W)

111000

3.40

377400

377400

188700

Lights (W)

5294

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 39 of 168

17998

17998

8999

454158

422742

126270

510928

475585

126270

9545

6014

-10068

520473

481599

116203

12.5%

08-NOV-2019

5604.85

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 39 of 168

Page 39 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT SWITCHGEAR HALL Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

5604.85

0.12

76

85

-17

0.68

0

0

0

34896

38738

-7912

ERLH

34896

38738

-7912

ERTH

555369

520337

108290

Outdoor Air(S)

5604.85

0.88

13

8

-14

1.08

69995

44106

Outdoor Air(Lt)

5604.85

0.88

76

85

-17

0.68

255906

284079

-58023

GTH

881269

848522

-23563

Refrigeration Load

881269

848522

-23563

Monsoon Reheat

-73830

38873

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

9241

5328

890511

892724

74.21

74.39

Winter KW

-14485

-11.16

Monsoon Heaters (KW)

11.39

ESHF =(ERSH/ERTH)

0.94

0.93

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

21980

20433

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-17.08

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-27.84

Final Values: Selected Load (TR)

74.39

Selected Airquantity (CFM)

21980.31

Winter Load (KW)

-11.16

Monsoon Heating (KW)

11.39

Humidifier (KW)

-17.08

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

156.62

0.00

0.00

0.00

138.74

0.00

0.00

0.00

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

1148.15

0.00

0.00

0.00

1017.10

0.00

0.00

0.00

1298.43

NET AREA

Partition 177.12

Solar & Trans. Gain-Wall & Roof N

1148

0.36

2

-1

-14

777

-227

-5729

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

1017

0.36

14

11

-14

5082

4193

-5075

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

1298

0.32

8

3

-9

3382

1363

-3681

S

08-NOV-2019

Return Air Heat Load Gain

Page 40 of 168

9241

SUTHAR KETANBHAI (C360) 40 of 168

Page 40 of 82

5328

-14485

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT SWITCHGEAR HALL GIS PANELS

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

SWITCHGEAR HALL GIS PANELS

DIFFERENTIAL

13.1

OUTDOOR

87.1

INDOOR

78.8

ROOM SIZE

38.69

ROOM AREA

795.63

ROOM VOLUME

20.57

22.25

MONSOON

Sq.ft

17706.67 Cu.ft

OCCUPANCY

0.00

AIR CHANGES

2.00

17.00

DESIGN CONDITIONS

DIFFERENTIAL cfm/per

WINTER

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

590.22

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

590.22

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

8.53

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

1.97

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

67.13

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

38.69

0.00

0.00

0.00

20.57

H

22.25

22.25

22.25

22.25

22.25

22.25

22.25

22.25

22.25

NETT AREA

0.00

0.00

0.00

0.00

793.85

0.00

0.00

0.00

457.68

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

67

1.00

12

11

0

806

738

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

S

B.Th.U/Hr/Sq.ft.

67.13

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

794

0.36

14

11

-14

3967

3272

-3961

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

S

Trans. Gain-Except Wall & Roof All Glass

67

1.13

13

8

-14

997

628

-1051

Partition

458

0.32

8

3

-9

1192

480

-1298

0

0.29

8

3

-9

0

0

0

796

0.36

8

3

-9

2332

939

-2538

0

Ceiling Floor

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

370

3.40

1257

1257

629

10550

7316

-8219

11869

8230

-8219

1005

633

-1060

12874

8864

-9279

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 41 of 168

12.5%

08-NOV-2019

590.22

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 41 of 168

Page 41 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT SWITCHGEAR HALL GIS PANELS Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

590.22

0.12

76

85

-17

0.68

0

0

0

3675

4079

-833

ERLH

3675

4079

-833

ERTH

16548

12943

-10113

Outdoor Air(S)

590.22

0.88

13

8

-14

1.08

7371

4645

Outdoor Air(Lt)

590.22

0.88

76

85

-17

0.68

26948

29915

-6110

GTH

50868

47503

-23998

Refrigeration Load

50868

47503

-23998

Monsoon Reheat

-7775

4010

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

0

0

50868

51513

4.24

4.29

0

Winter KW

-7.04

Monsoon Heaters (KW)

1.18

ESHF =(ERSH/ERTH)

0.78

0.68

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

544

376

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-1.80

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-2.93

Final Values: Selected Load (TR)

4.29

Selected Airquantity (CFM)

543.67

Winter Load (KW)

-7.04

Monsoon Heating (KW)

1.18

Humidifier (KW)

-1.80

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

38.69

0.00

0.00

0.00

Partition

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.57

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 42 of 168

0

SUTHAR KETANBHAI (C360) 42 of 168

Page 42 of 82

0 0

0

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT OPERATOR ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

OPERATOR ROOM

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

19.52

16.73

14.76

MONSOON

DESIGN CONDITIONS

ROOM AREA

326.46

Sq.ft

INDOOR

ROOM VOLUME

4818.60

Cu.ft

DIFFERENTIAL

OCCUPANCY

4.00

AIR CHANGES

1.50

17.00

cfm/per

WINTER

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

120.47

Cfm @ AC/Hr

68.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

120.47

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

14.76

14.76

14.76

14.76

14.76

14.76

14.76

14.76

14.76

NETT AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Partition

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Trans. Gain-Except Wall & Roof All Glass

0

1.13

13

8

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

0

Ceiling

0

0.29

8

3

-9

0

0

0

326

0.36

8

3

-9

957

385

-1041

Floor

Internal Heat Occupants (Nos.)

4

245

980

980

0

Power (W)

1000

3.40

3400

3400

1700

Lights (W)

152

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 43 of 168

516

516

258

5852

5281

917

6584

5941

917

205

129

-216

6789

6071

700

12.5%

08-NOV-2019

120.47

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 43 of 168

Page 43 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT OPERATOR ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

820

820

0

820

820

0

902

902

0

750

833

-170

ERLH

1652

1735

-170

ERTH

8441

7805

530

Latent Heat Occupants(Nos.)

4.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

120.47

0.12

76

85

-17

0.68

Outdoor Air(S)

120.47

0.88

13

8

-14

1.08

1504

948

Outdoor Air(Lt)

120.47

0.88

76

85

-17

0.68

5500

6106

-1247

GTH

15446

14859

-2304

Refrigeration Load

15446

14859

-2304

Monsoon Reheat

-1587

718

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

0

0

15446

15577

1.29

1.30

0

Winter KW

-0.68

Monsoon Heaters (KW)

0.21

ESHF =(ERSH/ERTH)

0.80

0.78

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

288

258

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.37

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-0.60

Final Values: Selected Load (TR)

1.30

Selected Airquantity (CFM)

288.04

Winter Load (KW)

-0.68

Monsoon Heating (KW)

0.21

Humidifier (KW)

-0.37

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 44 of 168

0

SUTHAR KETANBHAI (C360) 44 of 168

Page 44 of 82

0 0

0

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT AHU ROOM FF

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

AHU ROOM FF

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

39.03

38.61

18.97

MONSOON

DESIGN CONDITIONS

ROOM AREA

1506.85 Sq.ft

INDOOR

ROOM VOLUME

28592.25 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

0.00

FRESH AIR

17.00

cfm/per

WINTER

RH

1 Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

0.00

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

0.00

Cfm Selected

1-BF

0.88

Lat

205.00

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

8.53

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

1.97

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

67.13

0.00

0.00

0.00

L

0.00

0.00

0.00

0.00

39.03

0.00

38.61

0.00

0.00

H

18.97

18.97

18.97

18.97

18.97

18.97

18.97

18.97

18.97

NETT AREA

0.00

0.00

0.00

0.00

673.49

0.00

732.53

0.00

0.00

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

67

1.00

12

11

0

806

738

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

S

B.Th.U/Hr/Sq.ft.

67.13

Partition

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

673

0.36

14

11

-14

3365

2776

-3360

S SW

0

0.36

12

9

-14

0

0

0

733

0.36

10

7

-14

2605

1965

-3655

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

W

Trans. Gain-Except Wall & Roof All Glass

67

1.13

13

8

-14

997

628

-1051

Partition

0

0.32

8

3

-9

0

0

0

Ceiling

0

0.29

8

3

-9

0

0

0

1507

0.36

8

3

-9

4416

1779

-4806

0

Floor

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

700

3.40

2381

2381

1190

14570

10267

-11683

16391

11551

-11683

0

0

0

16391

11551

-11683

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 45 of 168

12.5%

08-NOV-2019

0.00

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 45 of 168

Page 45 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT AHU ROOM FF Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

0

0

0

0

0

0

ERLH

0

0

0

ERTH

16391

11551

-11683

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

0.00

0.12

76

85

-17

0.68

Outdoor Air(S)

0.00

0.88

13

8

-14

1.08

0

0

Outdoor Air(Lt)

0.00

0.88

76

85

-17

0.68

0

0

0

GTH

16391

11551

-11683

Refrigeration Load

16391

11551

-11683

Monsoon Reheat

0

4840

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

0

0

16391

16391

1.37

1.37

0

Winter KW

0.00

Monsoon Heaters (KW)

0.00

ESHF =(ERSH/ERTH)

1.00

1.00

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

0

0

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

0.00

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

0.00

Final Values: Selected Load (TR)

1.37

Selected Airquantity (CFM)

0.00

Winter Load (KW)

0.00

Monsoon Heating (KW)

0.00

Humidifier (KW)

0.00

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

39.03

0.00

38.61

0.00

Partition

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 46 of 168

0

SUTHAR KETANBHAI (C360) 46 of 168

Page 46 of 82

0 0

0

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT RACK ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

RACK ROOM

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

78.85

55.89

9.84

MONSOON

DESIGN CONDITIONS

ROOM AREA

4221.16 Sq.ft

INDOOR

ROOM VOLUME

41536.17 Cu.ft

DIFFERENTIAL

OCCUPANCY

3.00

AIR CHANGES

1.50

17.00

cfm/per

1038.40

Cfm @ AC/Hr

51.00

Cfm @ Occup

FRESH AIR

1038.40 Cfm Selected

GLASS AREA

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

73.7 -17

BF

0.12 Occupant Heat

Sens

245.00

1-BF

0.88

Lat

205.00

N

NE

E

SE

S

SW

W

NW

3.94

0.00

0.00

0.00

3.94

0.00

0.00

0.00

H

5.90

0.00

0.00

0.00

5.90

0.00

0.00

0.00

QTY

Gr/LB 150.0

50.0

L

All Glass 371.81

8.00

0.00

0.00

0.00

8.00

0.00

0.00

0.00

185.91

0.00

0.00

0.00

185.91

0.00

0.00

0.00

Partition

L

78.85

0.00

0.00

0.00

78.85

0.00

0.00

0.00

55.89

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

0.00

0.00

0.00

589.99

0.00

0.00

0.00

549.97

AREA WALL AREA

WINTER

RH

1

NETT AREA 589.99

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Area

U

Sum

Mon

Win

Sum

Mon

Win

186

1.00

23

11

0

4276

2045

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

186

1.00

12

11

0

2231

2045

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

N

S

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

590

0.36

2

-1

-14

399

-117

-2944

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

590

0.36

14

11

-14

2948

2432

-2944

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

4221

0.11

30

27

-14

13874

12746

-6436

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

372

1.13

13

8

-14

5521

3479

-5823

Partition

550

0.32

8

3

-9

1433

577

-1559

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

Internal Heat Occupants (Nos.)

3

245

735

735

0

Power (W)

44000

3.40

149600

149600

74800

Lights (W)

1962

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 47 of 168

6669

6669

3335

187686

180211

58429

211146

202737

58429

1768

1114

-1865

212915

203852

56564

12.5%

08-NOV-2019

1038.40

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 47 of 168

Page 47 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT RACK ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

615

615

0

615

615

0

Latent Heat Occupants(Nos.)

3.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

1038.40

0.12

76

85

-17

0.68

677

677

0

6465

7177

-1466

ERLH

7142

7853

-1466

ERTH

220056

211705

55098

Outdoor Air(S)

1038.40

0.88

13

8

-14

1.08

12968

8172

-13678

Outdoor Air(Lt)

1038.40

0.88

76

85

-17

0.68

47411

52631

-10750

GTH

280435

272508

30669

Refrigeration Load

280435

272508

30669

Monsoon Reheat

9063

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

4347

2698

284782

284269

23.73

23.69

-6930

Winter KW

6.96

Monsoon Heaters (KW)

2.66

ESHF =(ERSH/ERTH)

0.97

0.96

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

CFM Dehum ={(ERSH)/(1.08*Deh Rise)}

9033

8649

Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-3.16

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-5.16

Final Values: Selected Load (TR)

23.73

Selected Airquantity (CFM)

9033.32

Winter Load (KW)

6.96

Monsoon Heating (KW)

2.66

Humidifier (KW)

-3.16

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

78.85

0.00

0.00

0.00

78.85

0.00

0.00

0.00

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

578.04

0.00

0.00

0.00

578.04

0.00

0.00

0.00

409.73

NET AREA

Partition 55.89

Solar & Trans. Gain-Wall & Roof N

578

0.36

2

-1

-14

391

-114

-2884

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

578

0.36

14

11

-14

2888

2383

-2884

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

410

0.32

8

3

-9

1067

430

-1162

S

08-NOV-2019

Return Air Heat Load Gain

Page 48 of 168

4347

SUTHAR KETANBHAI (C360) 48 of 168

Page 48 of 82

2698

-6930

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT UPS ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

ROOM NAME

UPS ROOM

DIFFERENTIAL

13.1

ROOM SIZE

39.36

OUTDOOR

87.1 78.8

36.87

9.84

MONSOON

DESIGN CONDITIONS

ROOM AREA

1404.61 Sq.ft

INDOOR

ROOM VOLUME

13821.36 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

1.50

WALL AREA

cfm/per

WINTER

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

345.53

Cfm Selected

1-BF

0.88

Lat

205.00

73.7 -17

N

NE

E

SE

S

SW

W

NW

L

3.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

5.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

Gr/LB 150.0

50.0

345.53 FRESH AIR

GLASS AREA

17.00

RH

1

All Glass 92.95

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

92.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

39.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36.87

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

362.77

NETT AREA 294.35

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Area

U

Sum

Mon

Win

Sum

Mon

Win

93

1.00

23

11

0

2138

1022

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

N

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

294

0.36

2

-1

-14

199

-58

-1469

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

1405

0.11

30

27

-14

4617

4241

-2141

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

93

1.13

13

8

-14

1380

870

-1456

Partition

363

0.32

8

3

-9

945

381

-1029

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

0

Power (W)

9000

3.40

30600

30600

15300

Lights (W)

653

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 49 of 168

2219

2219

1110

42098

39275

10315

47360

44184

10315

588

371

-621

47949

44555

9694

12.5%

08-NOV-2019

345.53

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 49 of 168

Page 49 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT UPS ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

345.53

0.12

76

85

-17

0.68

0

0

0

2151

2388

-488

ERLH

2151

2388

-488

ERTH

50100

46943

9207

Outdoor Air(S)

345.53

0.88

13

8

-14

1.08

4315

2719

-4552

Outdoor Air(Lt)

345.53

0.88

76

85

-17

0.68

15776

17513

-3577

GTH

70192

67176

1078

Refrigeration Load

70192

67176

1078

Monsoon Reheat

3394

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

899

227

71091

70796

5.92

5.90

-2206

Winter KW

-0.33

Monsoon Heaters (KW)

0.99

ESHF =(ERSH/ERTH)

0.96

0.95

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

CFM Dehum ={(ERSH)/(1.08*Deh Rise)}

2034

1890

Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-1.05

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-1.72

Final Values: Selected Load (TR)

5.92

Selected Airquantity (CFM)

2034.32

Winter Load (KW)

-0.33

Monsoon Heating (KW)

0.99

Humidifier (KW)

-1.05

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

39.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

288.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

270.27

NET AREA

Partition 36.87

Solar & Trans. Gain-Wall & Roof N

289

0.36

2

-1

-14

195

-57

-1440

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

270

0.32

8

3

-9

704

284

-766

08-NOV-2019

Return Air Heat Load Gain

Page 50 of 168

899

SUTHAR KETANBHAI (C360) 50 of 168

Page 50 of 82

227

-2206

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT TECH ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

TECH ROOM

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

38.69

41.07

12.63

MONSOON

DESIGN CONDITIONS

ROOM AREA

1542.25 Sq.ft

INDOOR

ROOM VOLUME

19475.49 Cu.ft

DIFFERENTIAL

OCCUPANCY

4.00

AIR CHANGES

1.50

17.00

cfm/per

WINTER

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

486.89

Cfm @ AC/Hr

68.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

486.89

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

3.94

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

5.90

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

92.95

0.00

0.00

0.00

Partition

L

0.00

0.00

24.88

0.00

38.69

0.00

0.00

0.00

10.40

H

12.63

12.63

12.63

12.63

12.63

12.63

12.63

12.63

12.63

NETT AREA

0.00

0.00

314.17

0.00

395.59

0.00

0.00

0.00

131.30

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

93

1.00

12

11

0

1115

1022

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0 0

GLASS AREA

WALL AREA

Solar Gain - Glass

S

B.Th.U/Hr/Sq.ft.

92.95

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

NE

0

0.36

8

5

-14

0

0

0

314

0.36

16

13

-14

1796

1521

-1568

E SE

0

0.36

16

13

-14

0

0

0

396

0.36

14

11

-14

1977

1631

-1974

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

1542

0.11

30

27

-14

5069

4657

-2351

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

93

1.13

13

8

-14

1380

870

-1456

Partition

131

0.32

8

3

-9

342

138

-372

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

Internal Heat Occupants (Nos.)

4

245

980

980

0

Power (W)

1000

3.40

3400

3400

1700

Lights (W)

717

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 51 of 168

2437

2437

1218

18496

16655

-4802

20808

18737

-4802

829

522

-875

21637

19260

-5677

12.5%

08-NOV-2019

486.89

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 51 of 168

Page 51 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT TECH ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

820

820

0

820

820

0

Latent Heat Occupants(Nos.)

4.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

486.89

0.12

76

85

-17

0.68

902

902

0

3031

3365

-687

ERLH

3933

4267

-687

ERTH

25571

23527

-6364

Outdoor Air(S)

486.89

0.88

13

8

-14

1.08

6080

3831

Outdoor Air(Lt)

486.89

0.88

76

85

-17

0.68

22230

24678

-5040

GTH

53881

52036

-17818

Refrigeration Load

53881

52036

-17818

Monsoon Reheat

-6414

2378

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

2658

2132

56540

56546

4.71

4.71

-2541

Winter KW

-5.97

Monsoon Heaters (KW)

0.70

ESHF =(ERSH/ERTH)

0.85

0.82

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

918

817

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-1.48

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-2.42

Final Values: Selected Load (TR)

4.71

Selected Airquantity (CFM)

918.00

Winter Load (KW)

-5.97

Monsoon Heating (KW)

0.70

Humidifier (KW)

-1.48

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

24.88

0.00

38.69

0.00

0.00

0.00

Partition

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

NET AREA

0.00

0.00

182.38

0.00

283.61

0.00

0.00

0.00

76.22

10.40

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

NE

0

0.36

8

5

-14

0

0

0

182

0.36

16

13

-14

1043

883

-910

E SE

0

0

0.36

16

13

-14

0

0

0

284

0.36

14

11

-14

1417

1169

-1415

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

76

0.32

8

3

-9

199

80

-216

S

08-NOV-2019

Return Air Heat Load Gain

Page 52 of 168

2658

SUTHAR KETANBHAI (C360) 52 of 168

Page 52 of 82

2132

-2541

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT ENGINEER ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

ENGINEER ROOM

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

18.93

55.89

9.84

MONSOON

DESIGN CONDITIONS

ROOM AREA

1011.29 Sq.ft

INDOOR

ROOM VOLUME

9951.11

DIFFERENTIAL

OCCUPANCY

3.00

AIR CHANGES

1.50

WALL AREA

17.00

cfm/per

WINTER

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

Cfm @ AC/Hr

51.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

248.78

Cfm Selected

1-BF

0.88

Lat

205.00

73.7 -17

N

NE

E

SE

S

SW

W

NW

L

3.94

0.00

0.00

0.00

3.94

0.00

0.00

0.00

H

5.90

0.00

0.00

0.00

5.90

0.00

0.00

0.00

QTY

Gr/LB 150.0

50.0

248.78 FRESH AIR

GLASS AREA

Cu.ft

RH

1

All Glass 92.95

2.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

AREA

46.48

0.00

0.00

0.00

46.48

0.00

0.00

0.00

Partition

L

18.93

0.00

0.00

0.00

18.93

0.00

0.00

0.00

0.00

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

0.00

0.00

0.00

139.75

0.00

0.00

0.00

0.00

NETT AREA 139.75

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Area

U

Sum

Mon

Win

Sum

Mon

Win

46

1.00

23

11

0

1069

511

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

46

1.00

12

11

0

558

511

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

N

S

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

140

0.36

2

-1

-14

95

-28

-697

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

140

0.36

14

11

-14

698

576

-697

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

1011

0.11

30

27

-14

3324

3054

-1542

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

93

1.13

13

8

-14

1380

870

-1456

Partition

0

0.32

8

3

-9

0

0

0

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

Internal Heat Occupants (Nos.)

3

245

735

735

0

Power (W)

1000

3.40

3400

3400

1700

Lights (W)

470

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 53 of 168

1598

1598

799

12856

11227

-1893

14463

12630

-1893

424

267

-447

14887

12897

-2340

12.5%

08-NOV-2019

248.78

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 53 of 168

Page 53 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT ENGINEER ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

615

615

0

615

615

0

Latent Heat Occupants(Nos.)

3.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

248.78

0.12

76

85

-17

0.68

677

677

0

1549

1719

-351

ERLH

2225

2396

-351

ERTH

17113

15293

-2691

Outdoor Air(S)

248.78

0.88

13

8

-14

1.08

3107

1958

Outdoor Air(Lt)

248.78

0.88

76

85

-17

0.68

11359

12609

-2575

GTH

31578

29860

-8544

Refrigeration Load

31578

29860

-8544

Monsoon Reheat

-3277

1990

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

787

544

32365

32394

2.70

2.70

-1385

Winter KW

-2.91

Monsoon Heaters (KW)

0.58

ESHF =(ERSH/ERTH)

0.87

0.84

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

632

547

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.76

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-1.24

Final Values: Selected Load (TR)

2.70

Selected Airquantity (CFM)

631.62

Winter Load (KW)

-2.91

Monsoon Heating (KW)

0.58

Humidifier (KW)

-0.76

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

18.93

0.00

0.00

0.00

18.93

0.00

0.00

0.00

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

138.74

0.00

0.00

0.00

138.74

0.00

0.00

0.00

0.00

NET AREA

Partition 0.00

Solar & Trans. Gain-Wall & Roof N

139

0.36

2

-1

-14

94

-27

-692

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

139

0.36

14

11

-14

693

572

-692

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

S

08-NOV-2019

Return Air Heat Load Gain

Page 54 of 168

787

SUTHAR KETANBHAI (C360) 54 of 168

Page 54 of 82

0 544

-1385

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT LOBBY 1

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

LOBBY 1

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

99.29

15.81

12.46

MONSOON

DESIGN CONDITIONS

ROOM AREA

1569.72 Sq.ft

INDOOR

ROOM VOLUME

19564.96 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

1.00

17.00

cfm/per

WINTER

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

326.08

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

326.08

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

19.68

0.00

0.00

0.00

74.10

H

12.46

12.46

12.46

12.46

12.46

12.46

12.46

12.46

12.46

NETT AREA

0.00

0.00

0.00

0.00

245.29

0.00

0.00

0.00

923.52

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

245

0.36

14

11

-14

1226

1011

-1224

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

1570

0.11

30

27

-14

5159

4740

-2393

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

0

1.13

13

8

-14

0

0

0

Partition

924

0.32

8

3

-9

2406

969

-2618

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

729

3.40

2480

2480

1240

11271

9200

-4995

12679

10350

-4995

555

350

-586

13235

10700

-5581

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 55 of 168

12.5%

08-NOV-2019

326.08

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 55 of 168

Page 55 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT LOBBY 1 Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

326.08

0.12

76

85

-17

0.68

0

0

0

2030

2254

-460

ERLH

2030

2254

-460

ERTH

15265

12954

-6042

Outdoor Air(S)

326.08

0.88

13

8

-14

1.08

4072

2566

Outdoor Air(Lt)

326.08

0.88

76

85

-17

0.68

14888

16527

-3376

GTH

34225

32047

-13713

Refrigeration Load

34225

32047

-13713

Monsoon Reheat

-4295

2535

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

2136

1165

36361

35747

3.03

2.98

-2260

Winter KW

-4.68

Monsoon Heaters (KW)

0.74

ESHF =(ERSH/ERTH)

0.87

0.83

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

562

454

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.99

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-1.62

Final Values: Selected Load (TR)

3.03

Selected Airquantity (CFM)

561.51

Winter Load (KW)

-4.68

Monsoon Heating (KW)

0.74

Humidifier (KW)

-0.99

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

19.68

0.00

0.00

0.00

Partition

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

NET AREA

0.00

0.00

0.00

0.00

144.27

0.00

0.00

0.00

543.18

74.10

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

144

0.36

14

11

-14

721

595

-720

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

543

0.32

8

3

-9

1415

570

-1540

S

08-NOV-2019

Return Air Heat Load Gain

Page 56 of 168

2136

SUTHAR KETANBHAI (C360) 56 of 168

Page 56 of 82

1165

-2260

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT LOBBY 2

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

LOBBY 2

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

19.84

48.45

9.84

MONSOON

DESIGN CONDITIONS

ROOM AREA

961.35

Sq.ft

INDOOR

ROOM VOLUME

9459.73

Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

1.00

17.00

cfm/per

WINTER

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

157.66

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

157.66

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

4.92

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

8.20

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

40.34

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

19.84

0.00

0.00

0.00

19.84

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

NETT AREA

0.00

0.00

0.00

0.00

154.92

0.00

0.00

0.00

195.26

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

40

1.00

12

11

0

484

444

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

S

B.Th.U/Hr/Sq.ft.

40.34

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

155

0.36

14

11

-14

774

639

-773

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

961

0.11

30

27

-14

3160

2903

-1466

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

40

1.13

13

8

-14

599

377

-632

Partition

195

0.32

8

3

-9

509

205

-554

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

447

3.40

1519

1519

759

7045

6086

-2665

7925

6847

-2665

268

169

-283

8194

7016

-2948

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 57 of 168

12.5%

08-NOV-2019

157.66

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 57 of 168

Page 57 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT LOBBY 2 Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH

0

0

0

982

1090

-223

ERLH

982

1090

-223

ERTH

9175

8106

-3170

Outdoor Air

157.66

0.12

76

85

-17

0.68

Outdoor Air(S)

157.66

0.88

13

8

-14

1.08

1969

1241

Outdoor Air(Lt)

157.66

0.88

76

85

-17

0.68

7199

7991

-1632

GTH

18343

17338

-6879

Refrigeration Load

18343

17338

-6879

Monsoon Reheat

-2077

1177

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

1106

752

19448

19267

1.62

1.61

-1138

Winter KW

-2.35

Monsoon Heaters (KW)

0.35

ESHF =(ERSH/ERTH)

0.89

0.87

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

348

298

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.48

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-0.78

Final Values: Selected Load (TR)

1.62

Selected Airquantity (CFM)

347.63

Winter Load (KW)

-2.35

Monsoon Heating (KW)

0.35

Humidifier (KW)

-0.48

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

19.84

0.00

0.00

0.00

Partition

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

NET AREA

0.00

0.00

0.00

0.00

145.47

0.00

0.00

0.00

145.47

19.84

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

145

0.36

14

11

-14

727

600

-726

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

145

0.32

8

3

-9

379

153

-412

S

08-NOV-2019

Return Air Heat Load Gain

Page 58 of 168

1106

SUTHAR KETANBHAI (C360) 58 of 168

Page 58 of 82

752

-1138

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT AHU ROOM SF

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

AHU ROOM SF

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

39.41

41.07

19.96

MONSOON

DESIGN CONDITIONS

ROOM AREA

1571.88 Sq.ft

INDOOR

ROOM VOLUME

31372.82 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

0.00

FRESH AIR

17.00

cfm/per

WINTER

RH

1 Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

0.00

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

0.00

Cfm Selected

1-BF

0.88

Lat

205.00

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

3.94

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

5.90

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

92.95

0.00

0.00

0.00

L

0.00

0.00

0.00

0.00

39.41

0.00

41.07

0.00

0.00

H

19.96

19.96

19.96

19.96

19.96

19.96

19.96

19.96

19.96

NETT AREA

0.00

0.00

0.00

0.00

693.61

0.00

819.62

0.00

0.00

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

93

1.00

12

11

0

1115

1022

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

S

B.Th.U/Hr/Sq.ft.

92.95

Partition

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

694

0.36

14

11

-14

3466

2859

-3461

S SW W NW Roof Sun

0

0.36

12

9

-14

0

0

0

820

0.36

10

7

-14

2915

2198

-4090

0

0.36

4

1

-14

0

0

0

1572

0.11

30

27

-14

5166

4746

-2396

Trans. Gain-Except Wall & Roof All Glass

93

1.13

13

8

-14

1380

870

-1456

Partition

0

0.32

8

3

-9

0

0

0

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

730

3.40

2483

2483

1242

16527

14179

-10161

18592

15952

-10161

0

0

0

18592

15952

-10161

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 59 of 168

12.5%

08-NOV-2019

0.00

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 59 of 168

Page 59 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT AHU ROOM SF Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

0

0

0

0

0

0

ERLH

0

0

0

ERTH

18592

15952

-10161

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

0.00

0.12

76

85

-17

0.68

Outdoor Air(S)

0.00

0.88

13

8

-14

1.08

0

0

Outdoor Air(Lt)

0.00

0.88

76

85

-17

0.68

0

0

0

GTH

18592

15952

-10161

Refrigeration Load

18592

15952

-10161

Monsoon Reheat

0

2641

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

0

0

18592

18592

1.55

1.55

0

Winter KW

0.00

Monsoon Heaters (KW)

0.00

ESHF =(ERSH/ERTH)

1.00

1.00

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

0

0

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

0.00

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

0.00

Final Values: Selected Load (TR)

1.55

Selected Airquantity (CFM)

0.00

Winter Load (KW)

0.00

Monsoon Heating (KW)

0.00

Humidifier (KW)

0.00

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

39.41

0.00

41.07

0.00

Partition

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 60 of 168

0

SUTHAR KETANBHAI (C360) 60 of 168

Page 60 of 82

0 0

0

Page 61 of 168

HEAT LOAD ESTIMATION FOR VRMP

4.2.1 SUMMARY SHEET FOR NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 61 of 168

Page 61 of 82

Page 62 of 168

PROJECT : VIZAG REFINERY MODERNIZATION PROJECT OWNER : HINDUSTAN PETROLEUM CORPORATION LIMITED

CONSULTANT: ENGINEERS INDIA LIMITED

SUMMARY SHEET FOR NHT CCR FIELD ROOM BUILDING

Date: 03.10.2019

B18

1.0 1.0 0.0

102.00 102.00 0.00 204.00

08-NOV-2019 SUTHAR KETANBHAI (C360) 62 of 168

Page 62 of 82

I110

I111

-1.34 -1.06 -0.74 -3.15

0.43 0.27 0.35 1.05

-0.16 -0.16 0.00 -0.32

I108

I107

I109

826 326 302 1454.30

2.22 1.32 0.48 4.03

Humidifier ( Kw)

B15

50.0 50.0 50.0

Monsoon Heating ( KW )

J9

75.2 75.2 75.2

Winter Load ( KW)

H9

6.0 6.0 0.0 12.00

Unit Ref. Load

B58

Dehumidified Unit CFM

Fresh air ACPH

B59 1000 0 0 1000.00

fresh air CFM

Room Design RH in %age

D11 9.84 9.84 14.60

Room Design Temp. in deg. F

B12 621.83 264.15 164.60 1050.58

Height ( Ft )

C11 27.80 18.86 11.81

Floor Area(sqft)

B11 22.37 14.01 13.94

Width(Ft)

Occup. (Persons)

1 2 3

Length(Ft)

B10 SHIFT INCHARGE ROOM DINING ROOM PACKAGE AC ROOM TOTAL

S.no

Eqip. Load(W)

Area Description

Rev. 00

Page 63 of 168

HEAT LOAD ESTIMATION FOR VRMP

4.2.2 CALCULATION SHEET FOR NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 63 of 168

Page 63 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM SHIFT INCHARGE ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

NHT CCR FIELD ROOM

INDOOR

75.2

SHIFT INCHARGE ROOM

DIFFERENTIAL

16.7

OUTDOOR

87.1

ROOM SIZE

22.37

27.80

9.84

MONSOON

DESIGN CONDITIONS

ROOM AREA

621.83

Sq.ft

INDOOR

75.2

ROOM VOLUME

6118.81

Cu.ft

DIFFERENTIAL

11.9

OUTDOOR

64.9

INDOOR

75.2

DIFFERENTIAL

-10

OCCUPANCY

6.00

AIR CHANGES

1.00

17.00

cfm/per

WINTER

RH

Gr/LB 150.0

50.0

65.3 84.7

82.0

158.4 50.0

65.3 93.1

57.0

56.4 50.0

101.98

Cfm @ AC/Hr

102.00

Cfm @ Occup

BF

0.17 Occupant Heat

Sens

245.00

102.00

Cfm Selected

1-BF

0.83

Lat

205.00

FRESH AIR

1

65.3 -9

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

0.00

0.00

27.80

0.00

22.37

0.00

0.00

0.00

30.57

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

NETT AREA

0.00

0.00

273.53

0.00

220.12

0.00

0.00

0.00

300.80

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0 0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

NE

0

0.48

11

9

-10

0

0

0

274

0.48

19

17

-10

2558

2239

-1347

E SE

0

0.48

19

17

-10

0

0

0

220

0.48

17

15

-10

1847

1590

-1084

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

622

0.11

33

31

-10

2290

2124

-702

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

0

1.13

17

12

-10

0

0

0

Partition

301

0.32

12

7

-5

1130

662

-506

Ceiling

0

0.29

12

7

-5

0

0

0

Floor

0

0.36

12

7

-5

0

0

0

Internal Heat Occupants (Nos.)

6

245

1470

1470

0

Power (W)

1000

3.40

3400

3400

1700

Lights (W)

289

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 64 of 168

982

982

491

13677

12467

-1448

15387

14026

-1448

313

222

-192

15700

14248

-1640

12.5%

08-NOV-2019

102.00

0.17

17

12

-10

1.08

SUTHAR KETANBHAI (C360) 64 of 168

Page 64 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM SHIFT INCHARGE ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

1230

1230

0

1230

1230

0

1353

1353

0

999

1098

-105

Latent Heat Occupants(Nos.)

6.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

102.00

0.17

85

93

-9

0.68

ERLH

2352

2451

-105

ERTH

18052

16699

-1745

Outdoor Air(S)

102.00

0.83

17

12

-10

1.08

1531

1086

Outdoor Air(Lt)

102.00

0.83

85

93

-9

0.68

4876

5360

-512

GTH

24459

23145

-3196

Refrigeration Load

24459

23145

-3196

Monsoon Reheat

-938

1452

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

1983

2096

26441

26693

2.20

2.22

-1371

Winter KW

-1.34

Monsoon Heaters (KW)

0.43

ESHF =(ERSH/ERTH)

0.87

0.85

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

17.60

17.60

826

750

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.16

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-0.26

Final Values: Selected Load (TR)

2.22

Selected Airquantity (CFM)

826.17

Winter Load (KW)

-1.34

Monsoon Heating (KW)

0.43

Humidifier (KW)

-0.16

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

27.80

0.00

22.37

0.00

0.00

0.00

Partition

H

4.59

4.59

4.59

4.59

4.59

4.59

4.59

4.59

4.59

NET AREA

0.00

0.00

127.65

0.00

102.72

0.00

0.00

0.00

140.38

30.57

Solar & Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

NE

0

0.48

11

9

-10

0

0

0

128

0.48

19

17

-10

1194

1045

-629

E SE

0

0

0.48

19

17

-10

0

0

0

103

0.48

17

15

-10

862

742

-506

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

Roof Sun

0

0.11

33

31

-10

0

0

0

Partition

140

0.32

12

7

-5

527

309

-236

S

08-NOV-2019

Return Air Heat Load Gain

Page 65 of 168

2583

SUTHAR KETANBHAI (C360) 65 of 168

Page 65 of 82

2096

-1371

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM DINING ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

NHT CCR FIELD ROOM

INDOOR

75.2

DINING ROOM

DIFFERENTIAL

16.7

OUTDOOR

87.1

ROOM SIZE

14.01

18.86

9.84

MONSOON

DESIGN CONDITIONS

ROOM AREA

264.15

Sq.ft

INDOOR

75.2

ROOM VOLUME

2599.19

Cu.ft

DIFFERENTIAL

11.9

OUTDOOR

64.9

INDOOR

75.2

DIFFERENTIAL

-10

OCCUPANCY

6.00

AIR CHANGES

1.00

17.00

cfm/per

WINTER

RH

Gr/LB 150.0

50.0

65.3 84.7

82.0

158.4 50.0

65.3 93.1

57.0

56.4 50.0

43.32

Cfm @ AC/Hr

102.00

Cfm @ Occup

BF

0.17 Occupant Heat

Sens

245.00

102.00

Cfm Selected

1-BF

0.83

Lat

205.00

FRESH AIR

1

65.3 -9

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

14.01

0.00

0.00

0.00

32.87

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

NETT AREA

0.00

0.00

0.00

0.00

137.82

0.00

0.00

0.00

323.40

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

0

NE

0

0.48

11

9

-10

0

0

0

E

0

0.48

19

17

-10

0

0

0

SE

0

0.48

19

17

-10

0

0

0

138

0.48

17

15

-10

1156

996

-679

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

264

0.11

33

31

-10

973

902

-298

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

0

1.13

17

12

-10

0

0

0

Partition

323

0.32

12

7

-5

1215

712

-544

Ceiling

0

0.29

12

7

-5

0

0

0

Floor

0

0.36

12

7

-5

0

0

0

0

Internal Heat Occupants (Nos.)

6

245

1470

1470

Power (W)

0

3.40

0

0

0

Lights (W)

123

3.40

417

417

209

5231

4497

-1313

5885

5059

-1313

313

222

-192

6199

5282

-1505

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 66 of 168

12.5%

08-NOV-2019

102.00

0.17

17

12

-10

1.08

SUTHAR KETANBHAI (C360) 66 of 168

Page 66 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM DINING ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

1230

1230

0

1230

1230

0

1353

1353

0

999

1098

-105

ERLH

2352

2451

-105

ERTH

8551

7732

-1610

Latent Heat Occupants(Nos.)

6.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

102.00

0.17

85

93

-9

0.68

Outdoor Air(S)

102.00

0.83

17

12

-10

1.08

1531

1086

Outdoor Air(Lt)

102.00

0.83

85

93

-9

0.68

4876

5360

-512

GTH

14957

14178

-3060

Refrigeration Load

14957

14178

-3060

Monsoon Reheat

-938

917

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

707

797

15664

15892

1.31

1.32

-571

Winter KW

-1.06

Monsoon Heaters (KW)

0.27

ESHF =(ERSH/ERTH)

0.72

0.68

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

17.60

17.60

326

278

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.16

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-0.26

Final Values: Selected Load (TR)

1.32

Selected Airquantity (CFM)

326.19

Winter Load (KW)

-1.06

Monsoon Heating (KW)

0.27

Humidifier (KW)

-0.16

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

14.01

0.00

0.00

0.00

Partition

H

4.59

4.59

4.59

4.59

4.59

4.59

4.59

4.59

4.59

NET AREA

0.00

0.00

0.00

0.00

64.31

0.00

0.00

0.00

150.92

32.87

Solar & Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

0

NE

0

0.48

11

9

-10

0

0

0

E

0

0.48

19

17

-10

0

0

0

SE

0

0.48

19

17

-10

0

0

0

64

0.48

17

15

-10

540

465

-317

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

Roof Sun

0

0.11

33

31

-10

0

0

0

Partition

151

0.32

12

7

-5

567

332

-254

S

08-NOV-2019

Return Air Heat Load Gain

Page 67 of 168

1107

SUTHAR KETANBHAI (C360) 67 of 168

Page 67 of 82

797

-571

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM PACKAGE AC ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

NHT CCR FIELD ROOM

INDOOR

75.2

PACKAGE AC ROOM

DIFFERENTIAL

16.7

OUTDOOR

87.1

ROOM SIZE

13.94

11.81

14.60

MONSOON

DESIGN CONDITIONS

ROOM AREA

164.60

Sq.ft

INDOOR

75.2

ROOM VOLUME

2402.55

Cu.ft

DIFFERENTIAL

11.9

OUTDOOR

64.9

INDOOR

75.2

DIFFERENTIAL

-10

OCCUPANCY

0.00

AIR CHANGES

0.00

FRESH AIR

17.00

cfm/per

WINTER

RH

1 Gr/LB 150.0

50.0

65.3 84.7

82.0

158.4 50.0

65.3 93.1

57.0

56.4 50.0

0.00

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.17 Occupant Heat

Sens

245.00

0.00

Cfm Selected

1-BF

0.83

Lat

205.00

65.3 -9

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

13.94

0.00

11.81

0.00

25.75

H

14.60

14.60

14.60

14.60

14.60

14.60

14.60

14.60

14.60

NETT AREA

0.00

0.00

0.00

0.00

203.47

0.00

172.35

0.00

375.82

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

0

NE

0

0.48

11

9

-10

0

0

0

E

0

0.48

19

17

-10

0

0

0

SE

0

0.48

19

17

-10

0

0

0

203

0.48

17

15

-10

1707

1470

-1002

S SW W NW Roof Sun

0

0.48

15

13

-10

0

0

0

172

0.48

13

11

-10

1115

914

-849

0

0.48

7

5

-10

0

0

0

165

0.11

33

31

-10

606

562

-186

Trans. Gain-Except Wall & Roof All Glass

0

1.13

17

12

-10

0

0

0

Partition

376

0.32

12

7

-5

1412

827

-633

Ceiling

0

0.29

12

7

-5

0

0

0

Floor

0

0.36

12

7

-5

0

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

76

3.40

260

260

130

5100

4034

-2539

5738

4538

-2539

0

0

0

5738

4538

-2539

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 68 of 168

12.5%

08-NOV-2019

0.00

0.17

17

12

-10

1.08

SUTHAR KETANBHAI (C360) 68 of 168

Page 68 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM PACKAGE AC ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

0

0

0

0

0

0

ERLH

0

0

0

ERTH

5738

4538

-2539

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

0.00

0.17

85

93

-9

0.68

Outdoor Air(S)

0.00

0.83

17

12

-10

1.08

0

0

Outdoor Air(Lt)

0.00

0.83

85

93

-9

0.68

0

0

0

GTH

5738

4538

-2539

Refrigeration Load

5738

4538

-2539

Monsoon Reheat

0

1200

Return Air Heat Load

-400

0

Grand Total Refrigeration Load

BTU/HR

5338

5738

Grand Total Refrigeration Load

TR

0.44

0.48

0

Winter KW

-0.74

Monsoon Heaters (KW)

0.35

ESHF =(ERSH/ERTH)

1.00

1.00

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

17.60

17.60

302

239

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

0.00

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

0.00

Final Values: Selected Load (TR)

0.48

Selected Airquantity (CFM)

301.94

Winter Load (KW)

-0.74

Monsoon Heating (KW)

0.35

Humidifier (KW)

0.00

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

13.94

0.00

11.81

0.00

Partition

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.75

Solar & Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

0

NE

0

0.48

11

9

-10

0

0

0

E

0

0.48

19

17

-10

0

0

0

SE

0

0.48

19

17

-10

0

0

0

S

0

0.48

17

15

-10

0

0

0

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

Roof Sun

0

0.11

33

31

-10

0

0

0

Partition

0

0.32

12

7

-5

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 69 of 168

0

SUTHAR KETANBHAI (C360) 69 of 168

Page 69 of 82

0 0

0

Page 70 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-5 EQUIPMENT SELECTION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 70 of 168

Page 70 of 82

Page 71 of 168

HEAT LOAD ESTIMATION FOR VRMP

5.1. SELECTION

BUILDING/ FLOOR

AIR CONDITIONING SYSTEM TYPE

VAM

SYSTEM QUANTITY/ CAPACITY Total Load = 124.62 TR x 65 % each i.e. 81 TR each 2 Nos. of 83 TR VAM (Actual Capacity) 1 No. x 22850 CFM for First Floor

AIR HANDLING UNIT 1 No. x 13550 CFM for Second Floor 1 No. x 21 KW for First Floor

SUBSTATION BUILDING- 86 CT

HEATER 1 No. x 10.5 KW for Second Floor 1 No. x 21 KW for First Floor HUMIDIFIER 1 No. x 9 KW for Second Floor 2 Nos. x 3160 CFM for First Floor CHEMICAL FILTER UNIT 1 No. x 2650 CFM for Second Floor

NHT CCR BUILDING

Water Cooled Package AC

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 71 of 168

Page 71 of 82

2 Nos.(1W+1S) x 5.5 TR Water Cooled PAC Dehumidified CFM- 2200 CFM each

Page 72 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-6 ARCHITECTURE DRAWINGS

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 72 of 168

Page 72 of 82

Page 73 of 168

HEAT LOAD ESTIMATION FOR VRMP

6.1 LIST OF DRAWINGS: Sl No.

Drawing Title

Drawing Number

A.

Substation- 86 (CT)

1

Ground & First Floor Plan

B015-000-8141-02421, Rev.3

2

Second Floor Plan, Elevations & Sections

B015-000-8141-02422, Rev.2

3

Terrace Plan & Elevations

B015-000-8141-02423, Rev.1

4

Elevations & Sections

B015-000-8141-02424, Rev.2

5

Profile of Doors/Windows

B015-000-8141-02425, Rev.2

B.

Field Room-NHT CCR Plans, Elevations & Sections Terrace Plan, Elevations, Sections & Profile of Doors

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 73 of 168

Page 73 of 82

B015-000-8141-12821, Rev.0 B015-000-8141-12822, Rev.0

Page 74 of 168

HEAT LOAD ESTIMATION FOR VRMP

SUBSTATION BUILDING- 86 CT

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 74 of 168

Page 74 of 82

3

4

5

6

7

8

9

10

11

12

N

14

15

B015-000-81-41-02422 B015-000-81-41-02423 B015-000-81-41-02424 B015-000-81-41-02425

16

REFERENCE DRAWING TITLE SECOND FLOOR PLAN & SECTION TERRACE PLAN, ELEVATION & SECTION ELEVATIONS & SECTIONS DOORS & WINDOWS PROFILE

A

1 NOTES :-

FLOOR TRAP

V1A

V1A

V1A

V1A

REFER NOTE 16 & 17 900 900

RS1

B

AHU ROOM

POWER TRANSFORMER BELOW

HEAVY DUTY FLOORING

GYPSUM BOARD PARTITION UPTO FALSE CEILING

OPERATOR ROOM

1050

AC FC

LOADING/ UNLOADING PLATFORM

MONORAIL 1500

7500

33000

UP SD1A AL1

W2

V1

WALL TO BE CONSTRUCTED AFTER INSTALLATION OF EQUIPMENT

V1

RS1

AIR LOCK LOBBY

FC

AL2

1200

FC AC

1200

VITRIFIED TILE FLOORING

E

UP

UP STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

V1 5500mm HIGH WALL (TYP)

50 DIA G.I. SPOUT (TYP.)

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER BELOW

DN

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER BELOW

UP

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER BELOW

SD1

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER BELOW

DISTRIBUTION TRANSFORMER BELOW

SINK

W1

W1

W1

3500

6000

6000

1

6000

-

3300

STD. STEEL ROLLING SHUTTER, ELECTRICALLY OPERATED

RS2

3000x3000

-

3000

STD. STEEL ROLLING SHUTTER, PARTLY GRILL TYPE, ELECTRICALLY OPERATED

3

D1

1100x2100

0880x2090

2100

35 THK FULLY PANELLED DOOR SOMGLE SHUTTER AS PER EIL STD. 7-75-0066

3

D2

0900x2100

0880x2090

2100 PVC DOOR AS PER SPECIFICATIONS

04

AL1

1500x2500

1480x2490

POWDER COATED ALMN. GLAZED DOOR WITH 2500 6mm THK TOUGHENED GLASS, DOUBLE LEAF AS/EIL STD NO. 7-75-0014.

06

AL2

1000x2100

0980x2090

2100 SAME AS AL1A BUT SINGLE SHUTTER

06

W1

6000

550

6000 66550

6000

50 DIA G.I. SPOUT (TYP.)

2 EXHAUST FANS OF 450MM DIA

6000

6000

6000

6000

3500

F

3000x3300

W1

3

6000

W1

NOS.

RS1

EPOXY PAINT ON FLOOR WITH 2500 MM HIGH EPOXY PAINT ON DADO/WALL

DISTRIBUTION TRANSFORMER BELOW

G

160 Ø R.W.P. (TYP)

LINTEL TYPE OPENING SIZE FRAME SIZE LEVEL

1000 HIGH S.S. RAILING

BATTERY ROOM

1500

6000

DISTRIBUTION TRANSFORMER BELOW

5500mm HIGH WALL (TYP)

SCHEDULE OF DOORS & WINDOWS

1500

V1 1000 HIGH S.S. RAILING

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, SD1 1000 HIGH

1500

7500

FIRE HYDRANT

750

DN

DN

E

D

AIR LOCK LOBBY

AL2

HEAVY DUTY FLOORING

AL2

F

HEAVY DUTY FLOORING

2

SWITCHGEAR HALL

2500

15000

FC

MONORAIL 1500

AL2

AL2

VITRIFIED TILE FLOORING

REMOVEABLE TYPE 1000 HIGH S.S. RAILING

LOADING/ UNLOADING PLATFORM

PROTECTIVE STEEL PLATE COVER OVER EXP JOINT (TYP)

AL2

750

C

LIF T

2

FIRE HYDRANT

7500mm HIGH WALL (TYP)

RS1

HEAVY DUTY FLOORING

D

7500mm HIGH WALL (TYP)

R-150 T-300 W-1500 STEPS

VITRIFIED TILE FLOORING

2300

6000

HEAVY DUTY FLOORING

REMOVEABLE TYPE 1000 HIGH S.S. RAILING

1050

LOADING/ UNLOADING PLATFORM

POWER TRANSFORMER BELOW

CAPACITOR BANK BELOW

CAPACITOR BANK BELOW

2500

2 NOS. MONORAILS TO BE PROVIDED

6000

V1

GIS PANELS

3350

1500

V1

V1

V1

C

03 01

02

ELBUOD , ROOD DEZALG , DETAR ER I F RH - 2 1500x2500 1480x2490 2500 . NO I TAC I F FD1 I CEPS S ' RERUTCAFUNAM REP SA RETTUHS

G

05

73550

FD2

RETTUHS ELGN I S , 1DF SA EMAS 1000x2100 0980x2090 2100

SD1

1500x2500

1480x2490

2500

SD1A

1500x2500

1480x2490

2500 SAME AS SD1 BUT AIR-TIGHT

SD2

1000x2100

980x2090

2100

W1

1200x1800

1180x1790

ALMN. GLAZED WINDOW POWDER COATED WITH 3500 6 mm THKTOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

W2

3500x1800

3480x1790

V1

2600x 600

BEAM ALMN. GLAZED VENTILATOR POWDER COATED 2580x 590 BOTTOM WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

V1A

2600x 600

3

V2

1500x 600

3

V3

4000x 600

BEAM ALMN. GLAZED VENTILATOR POWDER COATED 3980x 590 BOTTOM WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

03

V4

2600x 600

2580x 590

ALMN. GLAZED VENTILATOR POWDER COATED 3500 WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

04

FIRST FLOOR PLAN

SLOPE 1:6 RAMP UP

1000 WIDE PLINTH PROTECTION ALL AROUND THE BUILDING

I

1485

EQ. 115 D2

EQ. D2

O

1340

TOILET

D/W

V1

V1

V1

V1

SLOPE 1:6 RAMP UP

RS2

PE

A C PLANT ROOM

D1

HEAVY DUTY FLOORING (CLEAR HEIGHT 3500mm - BEAM BOTTOM)

100.300

3

POWER TRANSFORMER

12000

F.F.L

LOADING/ UNLOADING PLATFORM

6000

TRANSFORMER GATE AS/ EIL STANDARD NO. 7-75-0052 (TYPICAL)

3 V1

V1 J

SLOPE 1:6 RAMP UP

FC

900

6000

600 WIDE R.C.C. SUNSHADE ABOVE

FLOOR TRAP

SL

SLOPE 1:6 RAMP UP

WALL TO BE CONSTRUCTED AFTER INSTALLATION OF EQUIPMENT

V1

V2

1

3

HEAVY DUTY FLOORING

100.150

100.150

EXHAUST FANS OF 450MM DIA (TYP)

100.150

TOP OF GRAVEL

TOP OF GRAVEL

02

PRESSED STEEL DOOR WITH PRESSED STEEL 08 FRAME, DOUBLE SHUTTER AS/EIL.STD. 7-75-0071 02

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, SINGLE SHUTTER AS/EIL.STD. 7-75-0070

46

ALMN. GLAZED WINDOW POWDER COATED WITH 2500 6 mm THK TOUGHENED GLASS, FIXED TYPE.

BEAM ALMN. GLAZED VENTILATOR POWDER COATED 2580x 590 BOTTOM WITH 6 mm THK TOUGHENED GLASS, FIXED TYPE. ALMN. GLAZED VENTILATOR POWDER COATED 1480x 590 3000 WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

H

05

01

24

I

04

02

J

LEGEND:

100.150

TOP OF GRAVEL

7500mm HIGH WALL (TYP)

V3

POWER TRANSFORMER

CAPACITOR BANK

CAPACITOR BANK

F.R.L. F.F.L.

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL AC = AIR CONDITIONED FC = FALSE CEILING AC UD UD = UNDERDECK INSULATION

TOP OF GRAVEL

7500mm HIGH WALL (TYP)

FC

V1

LIF T

V1

2300

H

K

K

KEY PLAN (Not To Scale) T-300 R-150

T-300 R-150

V1

PE

PE

FLOOR TRAP

345 THK BRICK WALL (TYP)

5500mm HIGH WALL (TYP)

6000

DISTRIBUTION TRANSFORMER 100.150 TOP OF GRAVEL

O SL

345 THK BRICK WALL (TYP) FLOOR TRAP

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER 100.150 TOP OF GRAVEL

345 THK BRICK WALL (TYP)

345 THK BRICK WALL (TYP)

5500mm HIGH WALL (TYP)

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

SD1

TOP OF GRAVEL

TOP OF GRAVEL

TOP OF GRAVEL

1500

6000

FLOOR TRAP

DISTRIBUTION TRANSFORMER 100.150

106.88

1200

100.300

F.F.L

F.F.L SD2

R-150 T-300

550

6000

3 2 1 0 D C B A

RAIN WATER PIPE UNDER FLOOR FOR WATER DISPOSAL (TYPICAL)

100.300

TOP OF GRAVEL

1000 HIGH S.S. RAILING

CEMENT CONCRETE FLOORING

CEMENT CONCRETE FLOORING

V1

3

PE

STORE ROOM

MAINTENANCE ROOM

V1

RAMP UP SLOPE 1:6

6000

M

O

1500

600 6000

DISTRIBUTION TRANSFORMER 100.150

RESIDUE UPGRADATION FACILITY (RUF)

V1

SD2

900

6000

SL

FLOOR TRAP

AL1

RAMP UP SLOPE 1:6

TRANSFORMER GATE AS/ EIL STANDARD NO. 7-75-0051 (TYPICAL)

6000

345 THK BRICK WALL (TYP)

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER 100.150

TOP OF GRAVEL

160 Ø R.W.P. (TYP)

3500

5500mm HIGH WALL (TYP)

100.300 F.F.L

2 1

O

UP

VITRIFIED TILE FLOORING

DISTRIBUTION TRANSFORMER 100.150

RAIN WATER PIPE UNDER FLOOR FOR WATER DISPOSAL (TYPICAL)

345 THK BRICK WALL (TYP)

FLOOR TRAP

LOBBY

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER 100.150

PE

345 THK BRICK WALL (TYP)

FIRE HYDRANT

750

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

SL O

PE O

SL

125 (TYP) 1500 (TYP)

07.05.18 13.03.18 08.11.17 02.11.17 11.08.17 21.06.17 16.06.17 08.06.17

REVISED AS MARKED 3 & REISSUED FOR CONSTRUCTION REVISED AS MARKED 2 & REISSUED FOR CONSTRUCTION REVISED AS MARKED & RE-ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION ISSUED FOR DET. ENGG. REISSUED FOR TENDER ISSUED FOR TENDER ISSUED FOR COMMENTS

REV. DATE T-300 R-150 STEP UP

RAMP UP SLOPE 1:6

1

6000

L

REVISIONS

SM SM SM SM SM SG SG SG

GJK GJK GJK GJK GJK GJK GJK GJK

BY

JS JS JS JS JS JS JS JS

N

V1

O SL

S/S 86 & SRR (FOR CT)

CWTP

RAMP UP

1500

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

1000 HIGH S.S. RAILING

N

1500

1500 (TYP) UP

SUMP BCW PH

SLOPE 1:6

SD1

125 (TYP) 1500 1500 (TYP) (TYP) UP

M

BCT(6+1)

1800

SD1

7500

750

2

HEAVY DUTY FLOORING

PROTECTIVE STEEL PLATE COVER OVER EXP JOINT (TYP)

OWS/CRWS SUMP-3 & PUMP HOUSE

STEP

CEMENT CONCRETE FLOORING 1500

SLOPE 1:6

1200

15000

FIRE HYDRANT

V3 LOADING/ UNLOADING PLATFORM

CHKD APPD PEM/PC

600 WIDE R.C.C. SUNSHADE ABOVE

O

CABLE CELLAR

1800

RAMP UP

1500

7500

2

L

N

2 1

EXHAUST FANS OF 450MM DIA (TYP)

V3

400.98

1 2

STEP

33000

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

13

EXPANSION JOINT WITH POLYSULPHIDE SEALANT COVERED WITH PROTECTIVE STEEL PLATE

3

12000

A B

2

REF. DWG. NO.

B015-000-81-41-02421

Page 75 of 168

1

(A Govt. of India Undertaking) 6000

6000

6000

6000

3500

66550 73550

100.00

GROUND FLOOR PLAN

P

SUB STATION - 86 (CT) GROUND & FIRST FLOOR PLAN

SCALE

001:1 1

2

3

4

5

6

7

8

9

10

11

12

13

14

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 75 of 168

Page 75 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 1 3 A0-1189 x 841

P

F.R.L

A B

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

REF. DWG. NO.

B015-000-81-41-02422

Page 76 of 168

1

REFERENCE DRAWING TITLE

B015-000-81-41-02421 GROUND & FIRST FLOOR PLAN B015-000-81-41-02423 TERRACE PLAN & ELEVATION B015-000-81-41-02424 ELEVATIONS & SECTIONS B015-000-81-41-02425 DOORS & WINDOWS PROFILE

A

N NOTES :-

B

2

2 1000 HIGH R.C.C. PARAPET WALL WATER PROOFING AS/TENDER SPECS. R.C.C. SLAB AS/STRL. 750 WIDE R.C.C. GUTTER

C

C

900

TERRACE

WATER PROOFING AS/TENDER SPECS. R.C.C. SLAB AS/STRL. 750 WIDE R.C.C. GUTTER

900

RACK ROOM

900

D

900

1250

800

D

1800

3000

1800

FALSE CEILING

FALSE CEILING AT 4500 HEIGHT 4500

SWITCHGEAR HALL CUT-OUTS IN SWITCHGEAR HALL FLOOR SLAB SHALL BE AS PER RELEVANT STRUCTURE DRAWING

6500

7500

DISTRIBUTION TRANSFORMER

E

CAPACITOR BANK

5500

6500

CABLE CELLAR

100.150

100.300

100.150

F.F.L

TOP OF GRAVEL

100.300

100.00

TOP OF GRAVEL

100.00

F.F.L

F.R.L

F.R.L

F

F

SECTION 1-1

WEST ELEVATION

G

G

EXPANSION JOINT WITH POLYSULPHIDE SEALANT COVERED WITH PROTECTIVE STEEL PLATE

H

3

H

1 750 WIDE RCC GUTTER (TYP)

160 Ø R.W.P. (TYP)

V2 1485

W1

EQ.

W1

W1

W1

FLOOR TRAP

W1

W1

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

W1

AHU ROOM

TECH ROOM

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

900

D1

SLOPE 1:80

D2 FC

SUNK SLAB

I

HEAVY DUTY FLOORING

12000

VITRIFIED TILES FLOORING

LOADING/ UNLOADING PLATFORM

1000 HIGH S.S. RAILING

AC FC UD

TERRACE

UD

TERRACE

HEAVY DUTY FLOORING

TREAD-300 RISER-150 (max.)

J

2 2300

STEP UP

6000

J

SLOPE

1000 HIGH RCC PARAPET WALL (TYP)

TOILET

D/W

6000

1340

D2

I

SLOPE

W1

EQ. 115

LIF T SD1A SD1

4800

VITRIFIED TILE FLOORING

FD1

SD1

W1

W1

DN

2

FALSE FLOORING

RACK ROOM

AC FC FF UD

FIRE HYDRANT

L

DN

STEP DOWN TREAD-300

FALSE FLOORING

EPOXY PAINT ON FLOOR WITH 2500 MM HIGH EPOXY PAINT ON DADO/WALL

VITRIFIED TILES FLOORING

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

FF = FALSE FLOORING

FD2

750

UPS ROOM

BATTERY ROOM

V4

FC

FALSE FLOORING AC FC FF UD

ELECTRICAL ROOM

FF UD

VITRIFIED TILE FLOORING

K

AC = AIR CONDITIONED FC = FALSE CEILING UD = UNDERDECK INSULATION

AC FC

STEP UP

UP

RISER-150 (max.)

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

AC FC FF UD

SINK

1800

7500

UP

TREAD-300 RISER-150 (max.)

AIR LOCK LOBBY

1200 750

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

V4

FD2

FIRE HYDRANT

F.R.L. F.F.L. FD1

FALSE FLOORING

AC FC FF UD

LEGEND:

W1

W1

ENGINEERING ROOM

LOBBY 2 AL1

L

W1

W1

PROTECTIVE STEEL PLATE COVER OVER EXP JOINT (TYP)

SD1

FC

V4

W1

W1

FD1

1200

7500

33000

VITRIFIED TILE FLOORING

2

W1

W1 FD1

RAMP UP SLOPE 1:7

AC FC UD

AIR LOCK LOBBY

K

WALL TO BE CONSTRUCTED AFTER INSTALLATION OF EQUIPMENT

LOBBY 1

1000

AL1

FD1

V4

15000

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

E

FD1

W1

W1

W1 DN

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

6000

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

W1

W1

W1

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL,1000 HIGH

1500 SLOPE

W1

W1

W1

W1

W1

W1

M

1000 HIGH S.S. RAILING

2

TERRACE

W1

UP

SLOPE

W1

TERRACE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

2 1 0 C B A

N

160 Ø R.W.P. (TYP)

3500

3

6000

6000

6000

1

6000

6000

6000 66550

550

6000

6000

6000

6000

6000

3500

13.03.18 08.11.17 02.11.17 11.08.17 16.06.17 08.06.17

REVISED AS MARKED 2 & REISSUED FOR CONSTRUCTION REVISED AS MARKED & RE-ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION ISSUED FOR DET. ENGG. ISSUED FOR TENDER ISSUED FOR COMMENTS

REV. DATE

73550

REVISIONS

O

SM SM SM SM SG SG

GJK GJK GJK GJK GJK GJK

BY

JS JS JS JS JS JS

N

W1

CHKD APPD PEM/PC

O

W1

SLOPE 1:80

W1

1000 HIGH S.S. RAILING

SLOPE 1:80

W1

SLOPE 1:80

W1

SLOPE 1:80

W1

SLOPE 1:80

M

W1

1500

W1

(A Govt. of India Undertaking)

P

SUB STATION - 86 (CT) द्वितीय

SCALE

001:1 1

2

3

4

5

6

7

8

9

10

11

12

13

14

दृश्य और काट

JOB NO.

SECOND FLOOR PLAN, ELEVATION & SECTION

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 76 of 168

Page 76 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 2 2 A0-1189 x 841

P

SECOND FLOOR PLAN

A B

2

3

4

5

6

7

8

9

10

11

12

13

15

16

REFERENCE DRAWING TITLE

B015-000-81-41-02421 GROUND & FIRST FLOOR PLAN B015-000-81-41-02422 SECOND FLOOR PLAN, ELEVATION & SECTION B015-000-81-41-02424 ELEVATIONS & SECTIONS B015-000-81-41-02425 DOORS & WINDOWS PROFILE

A

N NOTES :-

B

C

C

D

D

E

E

2300

600 HIGH RCC PARAPET WALL (TYP)

F 7500

F

15000

1

G

G

1

SLO

PE

SLO

PE

SLO

PE

7500

NORTH ELEVATION

H 160 Ø PVC RAIN WATER PIPE (TYP.) 3500

160 Ø PVC RAIN WATER PIPE (TYP.)

SLOPE

SLOPE

750 WIDE RAIN WATER GUTTER (TYP)

SLOPE

SLOPE

SLOPE

SLOPE

3

1000 HIGH RCC PARAPET WALL (TYP) SLOPE

SLOPE

1

SLOPE

I

I

MUMTY PLAN SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

6000

TERRACE BELOW

12000

600 HIGH RCC PARAPET WALL (TYP)

J

A MONORAIL BEAM TO BE PROVIDED INSIDE THE MACHINE ROOM (BOTTOM OF BEAM = 2500mm FROM FFL) FOR INSTALLATION OF CHAIN PULLEY IN THE MACHINE ROOM.

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

F.R.L. F.F.L.

SLOPE

7500

7500

LI FT

160 Ø PVC RAIN WATER PIPE (TYP.)

PE

K

2

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

7500

33000

AC UD

E

EXPANSION JOINT WITH POLYSULPHIDE SEALANT COVERED WITH PROTECTIVE STEEL PLATE

K

AC = AIR CONDITIONED FC = FALSE CEILING UD = UNDERDECK INSULATION

FC

OP

SL

LIFT MACHINE ROOM

2

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

PE SLO

RIDGE LINE

LEGEND:

2300

6000

J

SLO 3500

L

SD2

L 15000

RIDGE LINE

SD2

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

DN

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

MUMTY PLAN

M

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

600 HIGH RCC PARAPET WALL (TYP)

1

SLOPE 1000 HIGH S.S. RAILING

6000

6000

PE

SLO

1000 HIGH S.S. RAILING

SLOPE 1:80

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH 1500

M

1

FIRE HYDRANT

750

DN

SLO PE

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

DN

SLOPE 1:80

750

7500

SLOPE 1:80

SD2

SLOPE 1:80

SLO

V1

N

160 Ø PVC RAIN WATER PIPE (TYP.)

TERRACE BELOW

N

1 0 B A

SLO

PE

PE

V1 6000

3500

6000

6000

6000

6000

REVISED AS MARKED 1 & REISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION ISSUED FOR DET. ENGG. ISSUED FOR TENDER

REV. DATE

160 Ø R.W.P. (TYP)

3

13.03.18 08.11.17 11.08.17 16.06.17

REVISIONS

SM SM SM SG

GJK GJK GJK GJK

BY

JS JS JS JS

CHKD APPD PEM/PC

1 6000

6000

550

6000

6000

6000

6000

6000

3500

(A Govt. of India Undertaking)

66550

0

O

FIRE HYDRANT

1200

SD2

1200

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

14

REF. DWG. NO.

B015-000-81-41-02423

Page 77 of 168

1

MUMTY PLAN

73550

SUB STATION - 86 (CT) छत

SCALE

001:1 1

2

3

4

5

6

7

8

9

10

11

12

13

14

दृश्य

JOB NO.

TERRACE PLAN & ELEVATION

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 77 of 168

Page 77 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 3 1 A0-1189 x 841

P

TERRACE PLAN P

A B

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

REF. DWG. NO.

B015-000-81-41-02424

Page 78 of 168

1

REFERENCE DRAWING TITLE

B015-000-81-41-02421 GROUND & FIRST FLOOR PLAN B015-000-81-41-02422 SECOND FLOOR PLAN & SECTION B015-000-81-41-02423 TERRACE PLAN & ELEVATION B015-000-81-41-02425 DOORS & WINDOWS PROFILE

A

N NOTES :-

1000 HIGH R.C.C. PARAPET WALL WATER PROOFING AS/TENDER SPECS. R.C.C. SLAB AS/STRL.

B

LOBBY

3800

2500

AIR LOCK LOBBY

RACK ROOM

ENGINEERING ROOM

800

AIR LOCK LOBBY

FALSE CEILING 3000

FALSE CEILING

C

C MONORAIL

MONORAIL 1500 1500

FALSE CEILING AT 4500 HEIGHT

SWITCHGEAR HALL

D

600

3300 600

D

LOADING/ UNLOADING PLATFORM

4500

ROLLING SHUTTER

3300

LOADING/ UNLOADING PLATFORM

LOADING/ UNLOADING PLATFORM

LOADING/ UNLOADING PLATFORM

CABLE CELLAR 100.300

100.00

F.F.L

F.R.L

E

2

SECTION 2-2

F

F 1000 HIGH R.C.C. PARAPET WALL WATER PROOFING AS/TENDER SPECS. R.C.C. SLAB AS/STRL. 750 WIDE R.C.C. GUTTER

TERRACE

G

G

2700

LOBBY

2500

BATTERY ROOM

3800

2500

FALSE CEILING

AHU ROOM

CINDER FILLING

H 900

1250

H

FALSE CEILING AT 4500 HEIGHT

SWITCHGEAR HALL 4500

AHU ROOM

DISTRIBUTION TRANSFORMER

I 5500

I

2500

CUT-OUTS IN SWITCHGEAR HALL FLOOR SLAB SHALL BE AS PER RELEVANT STRUCTURE DRAWING 6500

AC PLANT ROOM

3000

CABLE CELLAR 100.300

100.150

100.300

100.00

F.F.L

TOP OF GRAVEL

F.F.L

F.R.L

2 J

J

SECTION 3-3

EAST ELEVATION

LEGEND: F.R.L. F.F.L.

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

K

K

AC = AIR CONDITIONED FC = FALSE CEILING UD = UNDERDECK INSULATION

FC AC UD

L

L

M

M

N

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

E

N

07.05.18 13.03.18 08.11.17 11.08.17

REVISED AS MARKED 2 & REISSUED FOR CONSTRUCTION REVISED AS MARKED 1 & REISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION ISSUED FOR DET. ENGG.

REV. DATE

O

REVISIONS

SM SM SM SM

GJK GJK GJK GJK

BY

JS JS JS JS

CHKD APPD PEM/PC

O

2 1 0 A

(A Govt. of India Undertaking)

2

SUB STATION - 86 (CT) दृश्य और

SCALE

001:1 1

2

3

4

5

6

7

8

9

10

11

12

13

14

काट

JOB NO.

ELEVATIONS & SECTIONS

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 78 of 168

Page 78 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 4 2 A0-1189 x 841

P

SOUTH ELEVATION P

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

REF. DWG. NO.

1480 1480

EQ.

N 880

500

2490

2090

VISION PANEL AS PER SPECIFICATION

VISION PANEL AS PER SPECIFICATION

NOTES :-

900

1350

LATCH AND LOCKING SYSTEM

900

900

GLASS

B

1350

2490

2090

PRESSED STEEL FRAME

LATCH AND LOCKING SYSTEM

900

GLASS

OVER HEAD HYDRAULIC DOOR CLOSER (HEAVY DUTY)

PRESSED STEEL FRAME

DOOR STOPPER

TEAK WOOD BOTTOM RAIL 200x35

A

AL. FRAME GLASS

GLASS

GLASS

OVER HEAD HYDRAULIC DOOR CLOSER (HEAVY DUTY)

500

AL. FRAME GLASS

75 LONG ALUMINIUM TOILET DOOR LATCH

300x25x6 THK. M.S. HOLD FAST @ MAX. 600 C/C. 11.10 DIA. 150 LONG ALUMINIUM BUTT HINGES @ MAX. 600 C/C.

1335 C

TOWER BOLT

CHROMIUM PLATE BRASS COAT AND HAT HOOK FIXED WITH BRASS SCREWS. (INTERNAL SIDE OF THE DOOR)

TEAK WOOD LOCK RAIL 150x35

EQ.

REFERENCE DRAWING TITLE GROUND & FIRST FLOOR PLAN SECOND FLOOR PLAN, ELEVATION & SECTION TERRACE PLAN & ELEVATION ELEVATIONS & SECTIONS

980

12 THK. PARTICLE BOARD

75 LONG ALUMINIUM TOILET DOOR LATCH

EQ.

ALUMINIUM TOWER BOLT 150X10 mm.

TEAK WOOD TOP RAIL 100x35 TEAK WOOD FRAME OUT OF 125x65 TEAK WOOD STYLE 100x35

CHROMIUM PLATE BRASS COAT AND HAT HOOK FIXED WITH BRASS SCREWS. (INTERNAL SIDE OF THE DOOR)

B015-000-81-41-02421 B015-000-81-41-02422 B015-000-81-41-02423 B015-000-81-41-02424

1480 EQ.

2490

1180 ALUMINIUM TOWER BOLT 150X10 mm.

2090

A B

B015-000-81-41-02425

Page 79 of 168

1

DOOR STOPPER

C

ACRYLIC KICK PLATE 200X3 THICK. RUBBER BEADING

ELEVATION : D1

ELEVATION : D2

35 THK FULLY PANELLED DOOR SINGLE SHUTTER AS/EIL STD NO. 7-75-0066 D

OPENING SIZE REQUIRED NOS.

: :

OPENING SIZE REQUIRED NOS.

2

: :

DOOR HANDLE

DOOR HANDLE

POWDER COATED ALMN. GLAZED DOOR WITH 6mm THK TOUGHENED GLASS, DOUBLE LEAF AS/EIL STD NO. 7-75-0014.

0900x2100 04

OPENING SIZE REQUIRED NOS.

: :

RUBBER BEADING

ELEVATION :SD1

ELEVATION :SD1A

SAME AS AL1A, BUT SINGLE SHUTTER

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, DOUBLE SHUTTER AS/EIL.STD. 7-75-0071

SAME AS SD1, BUT AIRTIGHT

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

ELEVATION : AL2

ELEVATION : AL1

PVC DOOR SINGLE SHUTTER

1100x2100 02

LEGEND-

RUBBER BEADING

F. - FIXED GLASS. SH. - SIDE HUNG SHUTTER. TH. - TOP HUNG SHUTTER.

D

1500x2500 06

: :

1000x2100 06

: :

1500x2500 08

: :

1500x2500 02

2 1180

(6 EQ.PARTS)

E

600

F

600

980

ARCHITECTURAL FINISHES SCHEDULE OVER HEAD HYDRAULIC DOOR CLOSER (HEAVY DUTY)

F

F

F

F

F

F

LOADING/ UNLOADING PLATFORM

HEAVY DUTY FLOORING

TRANSFORMER/ CAPACITOR BANK/ POWER TRANSFORMER

GRAVEL

910

910

1350

LATCH AND LOCKING SYSTEM

900

CEMENT CONCRETE FLOORING

CABLE CELLAR

SKIRTING/ WALL BASE 125mm HIGH CEMENT PLASTER SKIRTING 125mm HIGH CEMENT PLASTER SKIRTING

G

DOOR STOPPER

ELEVATION : W1

ELEVATION : W2

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, SINGLE SHUTTER AS/EIL.STD. 7-75-0070

ALMN. GLAZED WINDOW POWDER COATED WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

ALMN. GLAZED WINDOW POWDER COATED WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

: :

1000x2100 05

: :

1200x1800 46

: :

BOTTOM OF ROOF BEAM

F

580

ROOF BEAM

I

T.H.

SWITCHGEAR HALL

(5 EQ.PARTS) BOTTOM OF

T.H.

F

F

F

F

T.H.

AIR HANDLING UNIT

F

2990

ELEVATION : V1

ELEVATION : V1A

ELEVATION : V2

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE. OPENING SIZE : 2600x0600 REQUIRED NOS. : 24

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, FIXED TYPE.

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, OPENABLE TYPE.

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

2580

580

F

T.H.

F

125mm HIGH CEMENT CEMENT PLASTER + POP PUNNING + PLASTIC PLASTER SKIRTING EMULSION PAINT 125mm HIGH CEMENT CEMENT PLASTER + OIL PLASTER SKIRTING BOUND DISTEMPER

HEAVY DUTY FLOORING

: :

1500x0600 02

BATTERY ROOM

EPOXY PAINT

OPERATOR ROOM

VITRIFIED TILE FLOORING

2

(5 EQ.PARTS)

T.H.

125mm HIGH VITRIFIED TILES SKIRTING -

125mm HIGH GRANITE SKIRTING -

125mm HIGH VITRIFIED TILES SKIRTING

BOTTOM OF

F

T.H.

F

P

2

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

2500 MM HIGH EPOXY PAINT ON WALL OVER CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT ABOVE 2500MM HEIGHT

CEMENT PLASTER + OIL BOUND DISTEMPER

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

GYPSUM BOARD PANEL FALSE CEILING

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

UPS ROOM

FALSE FLOORING

-----

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

VITRIFIED TILE FLOORING

LOBBY

ELEVATION : V4

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

-----

125mm HIGH VITRIFIED TILES SKIRTING

K

L

M

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

2 07.05.18 REVISED AS MARKED 2 & REISSUED FOR CONSTRUCTION 1 13.03.18 REVISED AS MARKED 1 & REISSUED FOR CONSTRUCTION 0 08.11.17 ISSUED FOR CONSTRUCTION REV. DATE

VITRIFIED TILE FLOORING

125mm HIGH VITRIFIED TILES SKIRTING

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

VITRIFIED TILE FLOORING

125mm HIGH VITRIFIED TILES SKIRTING

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

O

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE. OPENING SIZE : 2600x0600 REQUIRED NOS. : 04

CEMENT PLASTER + OIL BOUND DISTEMPER

FALSE FLOORING

ELECTRICAL ROOM

ELEVATION : V3

CERAMIC TILES DADO UP TO CEILING

ENGG. ROOM

TECH. ROOM

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE. OPENING SIZE : 4000x0600 REQUIRED NOS. : 03

GYPSUM BOARD PANEL FALSE CEILING

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

T.H.

N

I

CEMENT PLASTER + OIL BOUND DISTEMPER

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

3500

580

T.H.

H

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

-----

ROOF BEAM F

CEMENT PLASTER + OIL BOUND DISTEMPER CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

FALSE FLOORING

3980

T.H.

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

G

RACK ROOM T.H.

(7 EQ.PARTS)

M

CEMENT PLASTER + OIL BOUND DISTEMPER

HEAVY DUTY FLOORING

GRANITE STONE FLOORING WITH ATI SLIP GROOVES

STAIRCASE

2

CEMENT PLASTER + OIL BOUND DISTEMPER

F

J

K

2600x0600 04

CEMENT PLASTER + OIL BOUND DISTEMPER CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

125mm HIGH CEMENT CEMENT PLASTER + OIL PLASTER SKIRTING BOUND DISTEMPER

NON-SLIP VITRIFIED TILE FLOORING

TOILET

: :

CEMENT PLASTER + OIL BOUND DISTEMPER CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

125mm HIGH CEMENT CEMENT PLASTER + POP PLASTER SKIRTING PUNNING + PLASTIC EMULSION PAINT

VITRIFIED TILE FLOORING

2410

J

CEILING FINISH

CEMENT CONCRETE FLOORING

F

AIR LOCK LOBBY

L

HEAVY DUTY FLOORING

1500

2580

(5 EQ.PARTS)

F

STORE & MAINTENANCE ROOM

3500x1800 01

(3 EQ.PARTS)

2580

T.H.

A C PLANT ROOM

580

H

ELEVATION : SD2

-----

WALL FINISH

N

S.H.

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

2

3

4

5

SM SM SM

GJK GJK GJK

BY

JS JS JS

CHKD APPD PEM/PC

(A Govt. of India Undertaking)

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

SUB STATION - 86 (CT) PROFILE OF DOORS/WINDOWS

SCALE

001:1 1

REVISIONS

O

2690 1180

S.H.

6

7

8

9

10

11

12

13

14

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 79 of 168

Page 79 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 5 2 A0-1189 x 841

P

2090

500

PRESSED STEEL FRAME VISION PANEL AS PER SPECIFICATION

FLOOR FINISH

ROOM 2690 1180

F

580

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

3480

(2 EQ.PARTS)

E

Page 80 of 168

HEAT LOAD ESTIMATION FOR VRMP

NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 80 of 168

Page 80 of 82

1000 HIGH R.C.C. PARAPET WALL WATER PROOFING (AS/SPECS.) R.C.C. SLAB AS/ STRL. DETAIL

N

REFERENCE DRAWING TITLE

NOTES:

750 WIDE R.C.C. GUTTER

1000

1. ALL DIMENSIONS ARE IN MILLIMETRES & LEVELS IN METRES. 2. EL100.000 INDICATES FINISHED APPROACH ROAD LEVEL NEAR THE BUILDING. 3. UNDERDECK INSULATION SHALL BE PROVIDED UNDER THE ROOF OF AC PACKAGE ROOM AND OTHER AC AREAS. 4. ALL OUTSIDE SURFACES SHALL BE FINISHED WITH 18MM. THK PLAIN CEMENT PLASTER ON BRICK SURFACES & 6MM THK PLAIN CEMENT PLASTER ON R.C.C. SURFACES, EXCEPT SAND FACE PLASTER WHEREVER MENTIONED. 5. ALL INTERNAL PERIPHERIAL WALLS SHALL BE FINISHED WITH 12MM THK PLAIN CEMENT PLASTER & 12MM/15MM THK PLAIN CEMENT PLASTER ON EITHER SIDE OF INTERNAL WALLS. 6MM THK PLAIN CEMENT PLASTER SHALL BE PROVIDED ON BOTTOM / UNDERSIDE OF ROOF. 6. 1000 WIDE PLINTH PROTECTION WITH BUILDING DRAIN SHALL BE PROVIDED ALL AROUND THE BUILDING. 7. ALL DOORS IN AC AREAS SHALL BE AIR TIGHT. 8. FOR INTERNAL AND EXTERNAL FINISHES, ENGINEERING DESIGN BASIS SHALL BE REFERRED. 9. FOR EXACT COORDINATES, LOCATION RESPECTIVE AREA DRAWING SHALL BE REFERRED. 10. LAN, TELEPHONE, SEATING POSITION IN SHIFT INCHARGE SHALL BE FINALISED INITIALLY TO AVOID REWORK ON PLASTERED SURFACES. 11. PROVISION OF STANDBY CEILING FANS ON WALL TO BE MADE IN ALL THE AREAS.

SHIFT INCHARGE ROOM

FALSE CEILING

PASSAGE

3000

B015-000-81-41-12821

100.450 100.00

100.00

F.R.L

F.R.L

F.F.L

19500

12. OTHER FACILITIES TO BE PROVIDED ARE AS FOLLOWS:

SECTION X-X

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

NORTH ELEVATION

A. A SMALL CHAIR/ SOFA TO BE PROVIDED IN WASH ROOMS/ CHANGE ROOMS. B. INDIVIDUAL LOCKERS WITH PROPER KEY AND LOCK SYSTEM TO BE PROVIDED. C. PROPER SIGNBOARD (HE/SHE, LADIES/GENTS WASHROOM) TO BE DISPLAYED IN ALL WASHROOMS. D. FOR ALL WESTERN/ INDIAN FACILITIES, WATER GUNS/ JET SPRAY TO BE PROVIDED. E. HAND DRIER IN ALL THE WASHROOMS TO BE PROVIDED. F. FOLLOWING FACILITIES IN ALL THE WASHROOMS TO BE PROVIDED. · FULL SIZE MIRROR · LIQUID HAND WASH · BATHROOM FRESHENERS · TOWELS · PROPER LIGHTING FACILITIES · TISSUE ROLLS · VENDING MACHINE FOR SANITARY NAPKINS, SANITARY DISPOSAL DUSTBIN & PAPER WRAPS FOR DISPOSAL IN LADIES WASHROOM

SCHEDULE OF DOORS & WINDOWS TYPE OPENING SIZE FRAME SIZE

100.00 F.R.L

19500

SOUTH ELEVATION

LINTEL DESCRIPTION LEVEL

NOS.

m m6 HT IW ROOD DEZALG . NMLA DETAOC REDWOP AL1 1100x2100 1080x2090 2100 RETTUHS E LGN I S , S SALG DENEHGUOT . KHT

01

m m6 HT IW ROOD DEZALG . NMLA DETAOC REDWOP AL2 1200x2100 1180x2090 2100 RETTUHS E LGN I S , S SALG DENEHGUOT . KHT

01

RETTUHS E LBUOFD1 D , ROO D DEZALG , 1480x2090 DETAR ER I F 2100 RH - 2 1500x2100 . NO I TAC I F I CEP S S ' RERUTCAFUNAM REP SA

01

D1

1100x2100

1080x2090

2100

35mm THK. PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

02

D2

900x2100

880x2090

2100

35mm THK. PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

02

SD1

1200x2100

1180x2090

2100

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, 01 AIR-TIGHT,SINGLE SHUTTER AS/EIL.STD. 7-75-0070

EAST ELEVATION X

E-752.37 N-875.72

D2

HEAVY DUTY FLOORING

2500

1600

F.R.L

FC UD

NHT/CCR UNIT

Y

VITRIFIED TILE FLOORING

BATH

F.R.L. F.F.L.

100.00

DOCMETN/ STORE ROOM

SHIFT INCHARGE ROOM VITRIFIED TILE FLOORING AC FC UD

NON SLIP VITRIFIED TILE FLOORING

2

CAT LADDER

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

= 230 THK BRICK WALL = RCC BLAST RESISTANT WALL

N FC AC UD

AL1

G.LOCKER ROOM

UD

F.F.L

LEGEND:

STEP UP R = 150 T = 300

2

1400

BATH

EQ

NON SLIP VITRIFIED TILE FLOORING

FD1

1600

EQ

G. TOILET

AC PACKAGE ROOM

8500

BATH

100.450

115 900

11500

EQ

WC

EQ

1600

GRANITE FLOORING

FC UD

11.50 3

EQ EQ

3000

Y

FC UD

PASSAGE

D1

NON SLIP VITRIFIED TILE FLOORING

NON SLIP VITRIFIED TILE FLOORING

WC WC

L.LOCKER ROOM

D2

L. TOILET FC UD

45°

WC

1600

1000 WIDE PLINTH PROTECTION (TYP.)

300 DIA EXHAUST FAN AT 3000 HEIGHT WITH RCC HOOD (TYP.)

FIELD ROOM (BLAST RESISTANT) NHT/CCR 19.5X11.5

AC = AIR CONDITIONED (SPLIT TYPE AC) FC = FALSE CEILING UD = UNDERDECK INSULATION

BLAST RESISTANT STRUCTURE

3 19.50

D1

SD1

F.F.L

PASSAGE

VITRIFIED TILE FLOORING

AL2

GRANITE FLOORING

AC FC UD

1000

100.450

1900

DINING ROOM

RAMP UP 1:12

45°

Page 81 of 168

REF. DWG. NO.

B015-000-81-41-12822 TERRACE PLAN, ELEVATION, SECTION & PROFILES OF DOORS

D/W

0 G F E D C B A

100.00 F.R.L 160 dia PVC RWP EMBEDDED IN PCC (TYP.)

4500

3500

4500

750 WIDE RCC GUTTER ABOVE (TYP.) 7000

22.07.19 02.04.19 11.01.19 30.11.18 01.11.18 27.07.18 28.06.18 14.06.18

ISSUED FOR CONSTRUCTION REVISED AND REISSUED FOR ENGG. ISSUED FOR DET. ENGG. REVISED & REISSUED FOR COMMENTS/TENDER ISSUED FOR TENDER REVISED AND REISSUED FOR CLIENTS APPROVAL REISSUED FOR COMMENTS ISSUED FOR COMMENTS

REV. DATE

REVISIONS

SM SM SM SM SM SM SM SM BY

GJK GJK GJK GJK GJK GJK GJK GJK

JS JS JS JS JS JS JS JS

CHKD APPD PEM/PC

19500

KEY PLAN

X

GROUND FLOOR PLAN FIELD ROOM - NHT CCR SCALE

001:1

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

3-1641-0501 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 81 of 168

Page 81 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 1 2 8 2 1 0 A1-841 x 594

REFERENCE DRAWING TITLE

N 1080

1080

1480

1180

1180

880

NOTES:

DEZALG .M NLADETA O CRW O ED P .K H Tm m 6H TW IR O D ELG NIS ,SSALGDENEH G U O T RETT U HS

DEZALG .M NLADETA O CRW O ED P .K H Tm m 6H TW IR O D ELG NIS ,SSALGDENEH G U O T RETT U HS

OPENING SIZE = 1100X2100

,R O DDEZALG ,DETARERIFR H -2 REP SARETT U HS ELB U O D .N OITACIFICEPS S 'RER U TCAFU N M A OPENING SIZE = 1500X2100

2090

2090

2090

2090

2090

1. ALL DIMENSIONS ARE IN MILLIMETRES & LEVELS IN METRES. 2. FOR ALL OTHER NOTES, REFER DWG. NO. B015-000-81-41-12821.

2090

B015-000-81-41-12822

35mm THK. WOODEN PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

35mm THK. WOODEN PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, AIR-TIGHT,SINGLE SHUTTER AS/EIL.STD. 7-75-0070

OPENING SIZE = 1100X2100

OPENING SIZE = 900X2100

OPENING SIZE = 1200X2100

OPENING SIZE = 1200X2100

PROFILES OF DOORS

300

1000

1000 HIGH R.C.C. PARAPET WALL WATER PROOFING (AS/SPECS.) R.C.C. SLAB AS/ STRL. DETAIL

FALSE CEILING

230 300 230

GENTS TOILET 3000

1000

100.00

DOCMETN/ STORE ROOM

100.450

SHIFT INCHARGE RM. 3000

1000

F.F.L

F.R.L

SECTION Y-Y

WEST ELEVATION

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

8500

SLOPE 1:80

3000

1000 HIGH RCC PARAPET WALL (TYP)

11500

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

(SCALE - 1:50)

0 30

Page 82 of 168

REF. DWG. NO.

B015-000-81-41-12821 PLANS, ELEVATIONS & SECTION

1000

CAT LADDER

SLOPE 160 Ø PVC RAIN WATER PIPE (TYP.)

SLOPE

SLOPE

SLOPE

SLOPE

750 WIDE RCC GUTTER (TYP.)

4500

3500

4500 19500

7000

0 22.07.19 ISSUED FOR CONSTRUCTION B 02.04.19 REVISED AND REISSUED FOR ENGG. A 11.01.19 ISSUED FOR DET. ENGG. REV. DATE

REVISIONS

SM SM SM BY

GJK GJK GJK

JS JS JS

CHKD APPD PEM/PC

TERRACE PLAN FIELD ROOM - NHT CCR SCALE

001:1

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

3-1641-0501 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 82 of 168

Page 82 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 1 2 8 2 2 0 A1-841 x 594

Page 83 of 168

Refer attached document for comments marked in. Revised document incorporating comments shall be submitted for approavl.

08-NOV-2019 SUTHAR KETANBHAI (C360) 83 of 168

Page 84 of 168

HINDUSTAN PETROLEUM CORPORATION LIMITED Visakh Refinery Modernization Project Doc Title: Heat Load Calculation for HVAC System Doc No: AV2K20-085-DOC-A001 OWNER’S CONSULTANT & PMC:

ENGINEERS INDIA LIMITED

EPC CONTRACTOR:

MYTHRI INFRA HVAC CONTRACTOR:

ADVANCE VENTILATION PVT LIMITED

0 Rev

10.10.2019

FOR REVIEW

R.L

J.K

S.N

Date

Purpose of Issue

Prepared By

Checked By

Approved By

08-NOV-2019 SUTHAR KETANBHAI (C360) 84 of 168

Page 85 of 168

HEAT LOAD ESTIMATION FOR VRMP

INDEX FOR HEAT LOAD OF SUBSTATION-86 CT & NHT CCR BUILDING SECTION SECTION 1

DESCRIPTION 1.1 General Project Information 1.2 Applicable Codes &Standards

SECTION 2

SECTION 3

SECTION 4

SECTION 5

SECTION 6

PAGE NOS.

1. General Information

2.DesignParameters 2.1WeatherData 2.2IndoorCriteria 2.3Lighting Load, Equipment Load, Fresh air ACPH, Occupancy 3.U-Factors, corrective ETD value for Wall &Roof, Sensible & latent heat load by human being Overall heat transfer co-efficient-Detail Calculation Overall heat transfer co-efficient – Relevant pages from ASHRAE&ISHRAE Corrective ETD value for wall &roof Sensible & latent heat load by human being Corrective ETD value for wall, roof & glass Reference Documents 4.Heat load 4.1.1 Heat load summary for Substation Building 86-CT 4.1.2 Summer, Monsoon & Winter heat load for Substation Building 86-CT 4.2.1 Heat load summary for NHT CCR Building 4.2.2 Summer, Monsoon & Winter heat load for NHT CCR Building

03-05

06-14

15-34

35-69

5. Equipment selection

70-71

6.Architecture Drawing

72-82

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 85 of 168

Page 2 of 82

Page 86 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-1 GENERAL INFORMATION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 86 of 168

Page 3 of 82

Page 87 of 168

HEAT LOAD ESTIMATION FOR VRMP

1.1GENERAL PROJECT INFORMATION PROJECT

HPCL VIZAG REFINERY EXPANSION PROJECT

OWNER

HINDUSTAN PETROLEUM CORPORATION LIMITED

HVAC CONTRACTOR

ADVANCE VENTILATION PVT. LTD.

PLANT LOCATION

VISAKHAPATNAM, INDIA

1. SUBSTATION BUILDING- 86 CT

BUILDING

2. NHT CCR BUILDING

building scope for SS-86 is covered under different tender (i.e. 8204). HVAC documents pertaining to that tender need to be submitted separately under respective DCI.

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 87 of 168

Page 4 of 82

Page 88 of 168

HEAT LOAD ESTIMATION FOR VRMP

1.2APPLICATION CODE AND RELEVENT STANDARD LATEST ISSUE  ASHRAE (American society of Heating, Refrigeration & Air-conditioning Engineer’s) fundamentals, Systems, Equipment’s & Application Handbook.  ISHRAE(Indian society Of Heating Refrigeration & Air Conditioning Engineer’s) Fundamentals, Systems, Equipment’s &Application Handbook  For Outdoor & Indoor Design conditions.  Ref. document no- (B015-000-80-43-SP-8203, Rev.0, Pg 9-10 ) for NHT CCR Building  Ref. document no- (B015-000-80-43-SP-8204, Rev.0, Pg 10 ) for Substation Building- 86 CT

Both above buildings are covered under separate tenders . Hence all documents pertaining to HVAC shall be generated separately for respective tender.

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 88 of 168

Page 5 of 82

Page 89 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-2 DESIGN PARAMETERS

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 89 of 168

Page 6 of 82

Page 90 of 168

HEAT LOAD ESTIMATION FOR VRMP

2.1 WEATHER DATA  Design Parameters Name of city

VISAKHAPATNAM

Location(state)

ANDHRA PRADESH

 Design outside atmospheric condition for HVAC calculation Season

DBT(0C)

WBT(0C)

RH%

Summer

33.3

27.8

65.8

Monsoon

30.6

27.8

80.6

Winter

18.3

13.9

61.4

for second floor of SS-86 building , insider room temp shall be considered as indicated for SRR as SF of SS-86 houses SRR

2.2 Indoor design condition Room / Area

Design temp DBT(0C)

RH%

Substation Building- 86 CT

26 +/- 1

50 +/- 5

NHT CCR Building

24 +/-1

50 +/- 5

2.3 Lighting Load, Equipment Load, Fresh air ACPH, Occupancy 

Lighting Load= 5W/ sq.m



Equipment Load/ Fresh Air ACPH/ Occupancy=

 Ref. document no- (B015-000-80-43-SP-8203, Rev.0, Pg 10-11 ) for NHT CCR Building  Ref. document no- (B015-000-80-43-SP-8204, Rev.0, Pg 11 ) for Substation Building- 86 CT

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 90 of 168

Page 7 of 82

Page 91 of 168

HEAT LOAD ESTIMATION FOR VRMP

DESIGN PARAMETERS SUBSTATION-SS 86 CT BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 91 of 168

Page 8 of 82

Page 92 of 168

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR PLANT & NON PLANT BUILDING WORKS

DOCUMENT No. B015-000-80-43-SP-8204 Rev. 0 Page 10 of 18

y) All Instruments, Controls and safety devices (Contractor to attach list of controls and safety devices) including all necessary interlocks, control panel, cabling, wiring etc. as detailed in the Instrumentation Specifications attached elsewhere. z) Electrical work/items as per Electrical specifications attached elsewhere. aa) Self standing/ wall mounted audio-visual annunciation panel. bb) Plant room ventilation system. 3.2.3

The entire work of design, engineering, manufacture, installation, commissioning and performance testing of equipment/systems shall be executed by one of the roved vendor for HVAC work.

3.2.4

Contractor shall develop the complete HVAC system configuration and submit for

3.2.5

Contractor shall be solely responsible to demonstrate the specified inside conditions throughout the year irrespective of any variation in the outside condition.

3.2.6

DESIGN DATA

3.2.6.1 Outside Design Condition SEASON

DBT (ºC)

WBT (ºC)

Summer

33.3

27.8

Monsoon

30.6

Winter

18.3

Air Quantity (As per Class GX (severe) of ANSI/ISAS71.04) H2S

50 ppb

27.8

SO2/SO3

300 ppb

13.9

Cl2

10 ppb

NOX

1250 ppb

Notes: 1. Outdoor design condition mentioned above shall be followed for AC heat load calculation purpose.

3.2.6.2

Inside Design Conditions S. No.

1. 2. 3.

Area

DBT, °C

SRR Building (area to be air-conditioned) Switch Gear Hall & Operator Room of Sub Station building Scale Room Building (For Split ACs)

% RH

23 ± 1

50 ± 5

26 ± 1

50 ± 5

24 ± 1

30 to 70

08-NOV-2019

Air Quality (As Per Class G1(mild) of doc. ISA -571.04) H2S < 3 ppb SO2/SO3 < 10 ppb Cl2 < 1 ppb NOx < 50 ppb Not Applicable

Copyright EIL

Format No. EIL 1641-1924 Rev. 1

SUTHAR KETANBHAI (C360) 92 of 168

Page 9 of 82

All rights reserved

Page 93 of 168

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR PLANT & NON PLANT BUILDING WORKS

3.2.6.3

DOCUMENT No. B015-000-80-43-SP-8204 Rev. 0 Page 11 of 18

Other Design Requirements Description Under Deck Insulation

Requirement Thermal insulation shall be provided for the areas to be air-conditioned, packaged AC Rooms and AHU Rooms. Fouling factor for water cooled 0.0004 hr.m².ºC/kcal Condenser Refrigerant (for VCR based AC R-134a or R-407a or R-407c or R-410a System) Hours of operation 24 hrs / 365 Days Lighting Load 5 Watts/m2 Outdoor Fresh Air 2.0 ACPH for Substation building & 1.5 ACPH for SRR Building Equipment Heat Dissipation As per Below Table Occupancy As per Below Table Table: Elect/Instru. Equipment Heat Dissipation & Occupancy Building Room/Area to Eqpt. Heat Occupancy be Air Load Conditioned (Elec.+Instru.) (Nos.) (kW) 1 Sub Station-96 Switch Gear Hall 97.0* -(Tankages) Operator Room 1.0* 4 2 Sub Station-86 Switch Gear Hall 111.0* -(Cooling Tower) Operator Room 1.0* 4 Rack Room 44.0 3 UPS Room 9.0 -Tech. Room 1.0 4 Engg. Room 1.0 3 Lobby --UPS Room 11.0 -Tech. Room 1.0 4 Engg. Room 1.0 3 Lobby --3 SRR-Tankages Rack Room 44.0 3 UPS Room 9.0 -Tech. Room 1.0 4 Engg. Room 1.0 3 Lobby --4 SRR- New Flare & Rack Room 53.0 3 Blending station Engg. Room 1.0 3 UPS Room 8.6 -Lobby --*: Equipment Heat Load mentioned includes heat load due to lighting also, Hence while calculating heat load for that particular area, lighting load shall not be considered. Sr. No.

3.2.7

Air conditioning system load/ capacities specified in Scope of Work & Supply are minimum to be considered by the contractor for HVAC equipment and same is given for estimation purpose only. Contractor shall submit the detailed heat load calculations as per the approved/ AFC building drawings and equipment

08-NOV-2019

Copyright EIL

Format No. EIL 1641-1924 Rev. 1

SUTHAR KETANBHAI (C360) 93 of 168

Page 10 of 82

All rights reserved

Page 94 of 168

HEAT LOAD ESTIMATION FOR VRMP

DESIGN PARAMETERS NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 94 of 168

Page 11 of 82

Page 95 of 168 Page 1088 of 1419

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR CONSTRUCTION OF FIELD ROOM & MSC. CIVIL WORKS

DOCUMENT No. B015-000-80-43-SP-8203 Rev. 0 Page 9 of 18

viii) Supply and fixing of steel supports for duct/cable/pipe/tubing etc. ix) Breaking and making good of openings in wall. x) Temporary scaffolding related to erection, testing and commissioning.

3.1.4

o)

Structural steel works as required for equipment support and base frame of equipment.

p)

Electrical panels and electrical works as per Electrical Specification attached elsewhere in the tender.

q)

Self standing/ wall mounted audio-visual annunciation panel.

Each air conditioning system with Inverter Controlled Split Air Conditioners for CWTP Field Room building and Auxiliary Fire station Building shall comprise of but not limited to the following: a)

Inverter controlled split air conditioner complete with all accessories, fittings and voltage stabilizer with time delay relay. Split unit shall have wall mounted indoor unit and remotely located air cooled condenser (outdoor unit) with insulated refrigerant piping, Controls and line accessories, Initial charge of refrigerant, Electrical and civil works (e.g. civil work related to concealing of refrigerant piping, condensate piping to the nearest drain, cabling in AC space and outside upto the outdoor unit) as required including the structural steel framework, pedestal to mount the indoor/outdoor units, supports for indoor/outdoor units, supports & clamps for refrigerant piping/cables, stabilizer, hold down nuts & bolts.

b)

Spares for commissioning and start up.

3.1.5

The entire work of design, engineering, manufacture, installation, commissioning and performance testing of equipment/systems shall be executed by one of the owner’s/EIL approved vendor for HVAC work (attached elsewhere in the tender). The list of acceptable sub-vendors for bought out items for HVAC System has also been tabulated in cl. no. 10.0 below for consideration by HVAC Contractor.

3.1.6

Contractor shall develop the complete HVAC system configuration and submit for Owner/EIL’s approval before starting the detail engineering work.

3.1.7

Contractor shall be solely responsible to demonstrate the specified inside conditions throughout the year irrespective of any variation in the outside condition.

3.1.8

DESIGN DATA

3.1.8.1 Outside Design Condition SEASON

DBT (ºC)

WBT (ºC)

Summer

33.3

27.8

Monsoon

30.6

27.8

SO2/SO3 ≤ 300 ppb

Winter

18.3

13.9

Cl2

≤ 10 ppb

NOX

≤ 1250 ppb

08-NOV-2019 Format No. EIL 1641-1924 Rev. 1 SUTHAR KETANBHAI (C360)

Air Quantity (As per Class GX (severe) of ANSI/ISAS71.04) H2S

≤ 50 ppb

Copyright EIL – All rights reserved

95 of 168

Page 12 of 82

Page 96 of 168 Page 1089 of 1419

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR CONSTRUCTION OF FIELD ROOM & MSC. CIVIL WORKS

DOCUMENT No. B015-000-80-43-SP-8203 Rev. 0 Page 10 of 18

Notes: 1. Outdoor design condition mentioned above shall be followed for AC heat load calculation purpose. 2. Design temperature for sizing of air cooled exchanger/condenser shall be 450C (peak ambient temperature).

3.1.8.2

Inside Design Conditions S. No.

1.

2.

3.

3.1.8.3

Sl. Area

DBT, °C

Switch Gear Hall & Operator Room of Sub Station building Shift-in-charge & Dining room of Field Room Buildings CWTP Field Room & Auxiliary Fire Station Building (For Split ACs)

% RH

26 ± 1

50 ± 5

24 ± 1

50 ± 5

Air Quality (As Per Class G1(mild) of doc. ISA -571.04) H 2S < 3 ppb SO2/SO3 < 10 ppb Cl2 < 1 ppb NOx < 50 ppb

24 ± 1

30 to 70

Not Applicable

Other Design Requirements Description Under Deck Insulation

Requirement Thermal insulation shall be provided for the areas to be air-conditioned, packaged AC Rooms and AHU Rooms. Fouling factor for water cooled 0.0004 hr.m².ºC/kcal Condenser Cooling water inlet temperature 33°C Design temperature for sizing Air 45°C cooled exchanger/condenser Refrigerant (for VCR based AC R-134a or R-407a or R-407c or R-410a System) Hours of operation 24 hrs / 365 Days Lighting Load 5 Watts/m2 Outdoor Fresh Air a. 2.0 ACPH or 17 CFM per person whichever is higher for Substation building & b. 1.0 ACPH or 17 CFM per person whichever is higher for Field Room buildings Equipment Heat Dissipation As per Below Table Occupancy As per Below Table

Sr. No.

Table: Elect/Instru. Equipment Heat Dissipation & Occupancy Building Room/Area to Eqpt. Heat Occupancy be Air Load Conditioned (Elec.+Instru.) (Nos.)

08-NOV-2019 Format No. EIL 1641-1924 Rev. 1 SUTHAR KETANBHAI (C360)

Copyright EIL – All rights reserved

96 of 168

Page 13 of 82

Page 97 of 168 Page 1090 of 1419

JOB SPECIFICATION (EQUIPMENT DIVISION) FOR CONSTRUCTION OF FIELD ROOM & MSC. CIVIL WORKS

DOCUMENT No. B015-000-80-43-SP-8203 Rev. 0 Page 11 of 18

(kW) 1

Sub Station-92

2

Sub Station-98

3

Each Field Room (Having Water cooled PAC System)

Switch Gear Hall Operator Room Switch Gear Hall Operator Room Shift-in-charge Room Dining Room

73.0* 0.7* 40.0* 0.7* 1.0

-6 -6 6

--

6

*: Equipment Heat Load mentioned includes heat load due to lighting also. Hence while calculating heat load for that particular area, lighting load need not to be considered. However, for other buildings / areas, lighting load shall be considered as specified in this job specification. 3.1.9

Air conditioning system load/ capacities specified in Scope of Work & Supply are minimum to be considered by the contractor for HVAC equipment and same is given for estimation purpose only. Contractor shall submit the detailed heat load calculations as per the approved/ AFC building drawings and equipment shall be selected for the higher of the two capacities i.e. capacities as per Scope of Work and capacities as per approved heat load calculation. No price or time implication shall be admissible to the contractor due to increase in heat load values provided equipment heat dissipation & air-conditioned area remain the same. Also, no price or time implication shall be admissible to the contractor on account of selection of higher capacity machine due to nonavailability of required/ exact capacity machine in the market. Contractor shall be solely responsible to demonstrate the specified inside conditions throughout the year irrespective of any variation in the outside condition. Accordingly, Contractor shall cross check the estimated plant capacity in his own interest before accepting the same. In case, Contractor desires to increase the plant capacity, he shall furnish adequate technical reasons and necessary technical data including heat load calculations in support of such increased plant capacity during pre-bid meeting. However, minimum capacity of the plant shall be as indicated in the Scope of Work & Supply, which shall be complied by the contractor.

3.1.10 Chemical filtration shall be provided in fresh air circuit of AC system (installed in AHU Room/ Packaged AC room) to maintain air quality (G1 environment) inside satellite rack room/ substation. Chemical filters shall be selected to capture Group-A gases as per ISA-71- 04 standard (from GX environment at outside to G1 environment at inside). 3.1.11 Air Conditioning equipment shall be interlocked with gas/smoke detection and firefighting systems. For Satellite Rack Room, required Hydrocarbon Detection System shall also be provided in AC suction and in ducts as per OISD standard. 3.1.12 Contractor shall consider heat dissipation from electrical/electronic equipment, Lighting Load & Occupancy while estimating the capacity of air-conditioning system. 3.1.13 Safety factor shall be considered as minimum 12.5% in respect of Room Sensible Heat and minimum 10% in respect of Room Latent Heat. 3.1.14 Packaged Units/ AHUs shall provide cooling and dehumidification in summer/monsoon by handling mixture of fresh and return air. Reheating shall be 08-NOV-2019 Format No. EIL 1641-1924 Rev. 1 SUTHAR KETANBHAI (C360)

Copyright EIL – All rights reserved

97 of 168

Page 14 of 82

Page 98 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-3 U-VALUE CALCULATION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 98 of 168

Page 15 of 82

Page 99 of 168

HEAT LOAD ESTIMATION FOR VRMP

U-FACTOR SUMMARY ASHRAE Description

U- Value--BTU/(hr)(ft².°F)

External wall - Solid Brick wall - 230mm thick

0.36

External wall - RCC Concrete wall - 230mm thick

0.48

Partition wall - Solid Brick wall - 230mm thick

0.32

Exposed Roof - RCC 150mm thick+50mm Insulation

0.11

Floor - RCC 150mm thick(Without Underdeck Insulation)

0.36

Ceiling - RCC 150mm thick(Without Underdeck Insulation)

0.29

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 99 of 168

Page 16 of 82

Page 100 of 168

HEAT LOAD ESTIMATION FOR MREP

U-Value calculation 1

External wall - Solid Brick wall - 230mm thick Thickness

Density

mm

kg/m3

Layer

Thermal Conductivit y W/m.K

R-Value

R-Value

(m².K)/W

(hr.ft².°F)/BTU

0.12

0.68

Reference

a

Inside vertical surface resistance (Air film)

b

Cement plaster, sand aggregate

12

1860

0.72

0.02

0.09

ASHRAE Fundamentals Handbook, Table 1

c

Solid Brick Wall

230

1920

0.81

0.28

1.61

ASHRAE Fundamentals Handbook, Table 1

d

Cement plaster, sand aggregate

18

1860

0.72

0.03

0.14

ASHRAE Fundamentals Handbook, Table 1

0.04

0.25

ASHRAE Fundamentals Handbook, Table 10

0.49

2.78

2.04

0.36

R-Value

R-Value

(m².K)/W

(hr.ft².°F)/BTU

0.12

0.68

e

Outside surface resistance U-VALUE

2

ASHRAE Fundamentals Handbook, Table 10

Partition wall - Solid Brick wall - 230mm thick Thickness

Density

mm

kg/m3

Layer

Thermal Conductivit y W/m.K

Reference

a

Inside vertical surface resistance (Air film)

b

Cement plaster, sand aggregate

12

1860

0.72

0.02

0.09

ASHRAE Fundamentals Handbook, Table 1

c

Solid Brick Wall

230

1920

0.81

0.28

1.61

ASHRAE Fundamentals Handbook, Table 1

d

Cement plaster, sand aggregate Inside vertical surface resistance (Air film)

12

1860

0.72

0.02

0.09

ASHRAE Fundamentals Handbook, Table 1

0.12

0.68

0.56

3.16

1.79

0.32

e

U-VALUE

MUMBAI REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 100 of 168

Page 17 of 82

ASHRAE Fundamentals Handbook, Table 10

ASHRAE Fundamentals Handbook, Table 10

Page 101 of 168

HEAT LOAD ESTIMATION FOR MREP

3

External wall - RCC Concrete wall - 230mm thick Thickness

Density

Thermal Conductivity

R-Value

R-Value

mm

kg/m3

W/m.K

(m2.K)/W

(hr.ft2.°F)/BTU

0.12

0.68

Layer a b c

Reference

Inside vertical surface resistance (Air film)

ASHRAE Fundamentals Handbook, Table 10

Cement plaster, sand aggregate

12

1860

0.72

0.02

0.09

ASHRAE Fundamentals Handbook, Table 1

RCC Concrete Wall

230

2400

1.4

0.16

0.93

ASHRAE Fundamentals Handbook, Table 1

d

Cement plaster, sand aggregate

18

1860

0.72

0.03

0.14

ASHRAE Fundamentals Handbook, Table 1

e

Outside surface resistance

0.04

0.25

ASHRAE Fundamentals Handbook, Table 10

0.37

2.10

2.70

0.48

R-Value

R-Value

(m2.K)/W

(hr.ft2.°F)/BTU

0.16

0.92

U-VALUE 4

Exposed Roof - RCC 150mm thick+50mm Insulation Layer

Thickness

Density

mm

kg/m3

Thermal Conductivity W/m.K

Reference

a

Indoor air film, still air, horizontal surface, downward heat flow

b

Underdeck Insulation(Mineral Wool)

50

16-48

0.04

1.25

7.10

ASHRAE Fundamentals Handbook, Table 1

c

RCC

150

2400

1.4

0.11

0.61

ASHRAE Fundamentals Handbook, Table 1

d

Light Weight Aggregate

20

960

0.3

0.07

0.38

ASHRAE Fundamentals Handbook, Table 1

0.04

0.25

ASHRAE Fundamentals Handbook, Table 10

1.77

10.02

0.57

0.10

e

Outside surface resistance U-VALUE

MUMBAI REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 101 of 168

Page 18 of 82

ASHRAE Fundamentals Handbook, Table 10

Page 102 of 168

HEAT LOAD ESTIMATION FOR MREP

5

Floor - RCC 150mm thick(Without Underdeck Insulation) Layer

a b

Thickness

Density

mm

kg/m3

Thermal Conductivity W/m.K

R-Value

R-Value

(m2.K)/W

(hr.ft2.°F)/BTU

0.11

0.62

Indoor air film, still air, horizontal surface, upward heat flow RCC

150

c

Light Weight Aggregate

50

d

Indoor air film, still air, horizontal surface, upward heat flow

ASHRAE Fundamentals Handbook, Table 10

2400

1.4

0.11

0.61

ASHRAE Fundamentals Handbook, Table 1

960

0.3

0.17

0.95

ASHRAE Fundamentals Handbook, Table 1

0.11

0.62

0.49

2.80

2.03

0.36

R-Value

R-Value

(m2.K)/W

(hr.ft2.°F)/BTU

0.16

0.92

U-VALUE 6

Reference

ASHRAE Fundamentals Handbook, Table 10

Ceiling - RCC 150mm thick(Without Underdeck Insulation) Layer

Thickness

Density

mm

kg/m3

Thermal Conductivity W/m.K

Reference

a

Indoor air film, still air, horizontal surface, downward heat flow

b

RCC

150

2400

1.4

0.11

0.61

ASHRAE Fundamentals Handbook, Table 1

c

Light Weight Aggregate

50

960

0.3

0.17

0.95

ASHRAE Fundamentals Handbook, Table 1

d

Indoor air film, still air, horizontal surface, downward heat flow

0.16

0.92

0.60

3.40

1.67

0.29

U-VALUE

MUMBAI REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 102 of 168

Page 19 of 82

ASHRAE Fundamentals Handbook, Table 10

ASHRAE Fundamentals Handbook, Table 10

Page 103 of 168

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

01234678429  7 381 938 797 796

171  2318728 18371



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
W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 W1 m8737 9 op tpuvwx u vwxpt o{puovwx \1z1819m1 j9 2379 231'8-672 |}cd~b€cde€cbb ‚3%=547"7%##))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) B)M K %"%&.:BB:0 A)Q#!M): B)BCV#!B)BCM ƒ ƒ >!"%&5%'#"".:B//0 @)M#!/: B)BCB#!B)BCh ƒ ƒ >!"%&5%'#"".:B//0 /h#!/C B)BhA#!B)Bh@ ƒ ƒ >!"%&5%'#"".:B//0 :: B)Bhh ƒ ƒ >!"%&5%'#"".:B//0 _!'G%&63%;+!!37%##))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ B)M K %"%&./@@V0 h:#!hA B)BhV#!B)BhA ƒ ƒ J&%&5%'#"".:B//0 CQ B)Bhh#!B)BhQ ƒ ƒ J&%&5%'#"".:B//0 `4&"%3+!!3-53#6)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /V#!CM B)BCB ƒ ƒ gES<„.:BBV0-…E!"%&5%'#"".:B//0 %;6/MB6%1)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ::#!QM B)B:@ J&%&5%'#"".:B//0 „"!(%&("!6'#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) hB B)BhB J&%&5%'#"".:B//0 %;6Q1%"%#:CŠg)))))))))))))))))))))))))))))))))))))))))))))))))))))) h:#!hQ BBhB ƒ ƒ J&%&5%'#"".:B//0 73!+&+4#$3!+;3!7%3+%" 4&;(!#%3.‚‹L0.ŒQ0 73!+4&;%;&#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) B)BhQ#!B)BhV ƒ ƒ J&%&5%'#"".:B//0 „?(%&66(!31#1"&-!3667%6))))))))))))))))))))))))))))))))) ƒ ƒ ƒ /)Q K %"%&./@@V0 /V#!:C B)BhQ#!B)BhA ƒ ƒ E&6(&6&###"(!"#.:BBM0 :@ B)Bhh ƒ ƒ E&6(&6&###"(!"#.:BBM0 `4&"%3547"7!%"6-+#53#6))))))))))))))))))))))))))))))))))))))))))))) /VB B)BhA ƒ B)M K %"%&./@@V0 _!'G+!!37!%"6))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ B)M K %"%&./@@V0 53!!"%&6+%33))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) VC#!/hB B)Bhh#!B)BhV ƒ ƒ >4,%&5%'#"".:B//0 "!!54&;)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/VB#!/MB) B)Bh@#!B)BC: ƒ B)M >4,%&5%'#"".:B//0 B)V#!B)M O'!#4'%3#43)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) hCB#!hAB B)BQ:#!B)BQh ƒ L"34#7!%"6)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /CB B)BQ: ƒ ƒ J&%&5%'#"".:B/B0 L!314!'1%&"%#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ /)Q K %"%&./@@V0 &5%'6-%;6("g%&Tˆ‰gabcdecfe
Page 20 of 82

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

°

±iq6[0\6Z029  o²9 21932 u[jx X21i 7 7929 j9 2379 231872 kW1 79l21 2u¾¿ÀÁÂÀÃÄÅx

W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 op tpuvwx u vwxpt o{puovwx \1z1819m1 ƒ B)B:B#!B)B:h ƒ ƒ J&%&5%'#"".:B//0 ƒ ƒ ƒ /)C …E!"%&5%'#"".:B//0 /@#!:V B)Bh@#!B)BCB ƒ ƒ >!"%&5%'#"".:B//0 QV B)Bh@#!B)BCB ƒ ƒ J&%&5%'#"".:B//0 h:#!VC B)Bh@#!B)BCQ ƒ /)/ .`%&5%'#""-(":BB/0 VC#!/:B B)BCQ#!B)BQ: ƒ ƒ .`%&5%'#""-(":BB/0 / : B  # !  / M B B ) B Q :  # !  B ) B V / ƒ ƒ .`%&5%'#""-(":BB/0 ‚3%547"6 %##4'-·/BB#!VBB ))))))))))))))))))))))))))))))))))))))))))))))))) V)C#!M)B B)BQ:#!B)BQQ ƒ ƒ >!"%&5%'#"".:B//0 %##4'-·VBB#!//BB )))))))))))))))))))))))))))))))))))))))))))))))) M#!@)V B)BC@#!B)BQ: ƒ ƒ >!"%&5%'#"".:B//0 '3!6%##4'!"+%33'%,4#4)))))))))))))))))))))))))))))))))))))))))))) :@#!hA B)BhQ#!B)BhV ƒ ƒ >!"%&5%'#"".:B//0 _!'G%&63%;+!!36 %##4'-·@B#!//Q )))))))))))))))))))))))))))))))))))))))))))))))))))) :C#!:V B)BC@ ƒ ƒ N$"%&5%'#"".:B//0 %##4'-·/:Q#!ChB )))))))))))))))))))))))))))))))))))))))))))))))))) :C#!:@ B)BCV#!B)BCM ƒ ƒ N$"%&5%'#"".:B//0 '3!6%##4'!"+%33'%,4#4)))))))))))))))))))))))))))))))))))))))))))) VC B)Bh@#!B)BC: ƒ ƒ N$"%&5%'#"".:B//0 ¸" 4'34#-?5!34%#6))))))))))))))))))))))))))))))))))))))))))))))))))))))))//:#!/h/ B)BVM ƒ /)h <%74&#%3)./@AQ0 VC#!@V B)BVh ƒ ƒ `%&5%'#"".(":BB/0 a¹fcº»c¹¹}µe g333!-("%164&#!!(&+%33'%,4#4)))))))))))))))))))) :V#!C: B)Bh@#!B)BCB ƒ ƒ N+!%&5%'#"".:B//0 ‚3%547"-("%164&#!!(&+%33!"%##4''%,4#4)))))) /V B)Bh@#!B)BC: ƒ ƒ `%&5%'#""F%!'4%#4!&.:B//0 :@#!hA B)Bhh#!B)BhA ƒ ƒ >!"%&5%'#"".:B//0 L!31"#$%&5!% )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ /)Q K %"%&.:BB:0 3!+6&4#1-!(&'33)))))))))))))))))))))))))))))))))))))))))))))))))))) A):#!/B B)BhA#!B)BC: ƒ ƒ N$"%&5%'#"".:B//0 64 6&4#1-'3!6'33-%;6/MB6%1)))))))))))))))))) hB#!Q/ B)B:B#!B)B:@ ƒ ƒ >4,%&5%'#"".:B//0 7 79 28 29 [7 79 |†cfe O7#!T' &#7!%"6)))))))))))))))))))))))))))))))))))))))))))))))))))))))) /@BB B)QA ƒ /)BB …!##%;./@CA0 g &#7!%"6))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) //QB B):Q ƒ B)MC K %"%&.:BB:0 >47"T' &#7!%"6)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /CBB B):Q ƒ B)MC K %"%&.:BB:0 /BBB B)/@ ƒ B)MC K %"%&./@@V0 CBB B)BA ƒ /)MM K %"%&./@@V0 hBB B)BV ƒ /)MM K %"%&./@@V0 ‚1( !"(3%#"7!%"6))))))))))))))))))))))))))))))))))))))))))))))))))))) VCB B)/V ƒ /)/Q K %"%&.:BB:0 J"4&#6#"%&67!%"6.J<S0)))))))))))))))))))))))))))))@#!// VQB ƒ B)// /)MM K %"%&.:BB:0 )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/:)A VQB ƒ B)/: /)MM K %"%&.:BB:0 L31+!!6.6!;3%54"0))))))))))))))))))))))))))))))))))))))))))))/:)A CVB ƒ B)/C /)MM K %"%&.:BB:0 )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/Q)@ QCB ƒ B)/Q /)MM K %"%&.:BB:0 L31+!!6T+!!6(%&3))))))))))))))))))))))))))))))))))))))))))))/@)B CQB ƒ B)/@ /)MM K %"%&.:BB:0 ¸;#%73547"7!%"6 VQB ƒ B)// /)MM K %"%&.:BB:0 $%#$4&;-";3%"6&4#1))))))))))))))))))))))))))))))))/:)A :@B ƒ B):h /)hB ‰+4./@VA0 4&#" 64%#6&4#1)))))))))))))))))))))))))))))))))))/:)A hQB ƒ B)/@ /)hB ‰+4./@VA0 &%43=7%6$%#$4&;))))))))))))))))))))))))))))))))))))))))/:)A CBB ƒ B)/@ /)hB $4&;37%'G"))))))))))))))))))))))))))))))))))))))))))))))))))))@)Q :@B ƒ B)/A /)hB !&66%6&4&;7!%"6))))))))))))))))))))))))))))))))))))/:)A :CB ƒ B):C /):V #43%&63%1=4&(%&3-(3%4&!"%'!#4' :@B B)BQM ƒ B)Q@ 3% 4&%#6(%("7!%"6 CMB B)BA: ƒ /)hM ‰+4./@VA0 $! !;&!7!%"65"! "(3(6(%(" CMB B)BA: ƒ /)/A *%"67!%"6 64 6&4#1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) MBB B)/BQ ƒ /)hB ‰+4./@VA0 $4;$6&4#1-",4'=# ("6;"%6%&6",4';"%6 MMB B)/: ƒ /)hC ‰+4./@VA0 $4;$6&4#1-#%&6%"6=# ("6;"%6)))))))))))))))))))))))))) /B/B B)/CC ƒ /)hC ‰+4./@VA0 L%"#4'37!%"6 3!+6&4#1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) Q@B B)/B: ƒ /)hB ‰+4./@VA0 64 6&4#1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) MBB B)/hQ ƒ /)hB ‰+4./@VA0 $4;$6&4#1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /BBB /)/M ƒ ƒ ‰+4./@VA0 &6"3%1 &#))))))))))))))))))))))))))))))))))))))))))))))))))/Q)@ VCB ƒ /):: /):/ ‰+4./@VA0 ‹%5"7!%"6)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ABB B)BA: ƒ /)MM K %"%&./@@V0 a¼µd½}‡ O7#!T' &#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /@BB ƒ B)BhA ƒ ‹!!6-CBB -/@B ?(!")))))))))))))))))))))))))))))))) ƒ ƒ B)/Q /)hB ‹!!6-6!73-CBB -hBB ?(!"))))))))))))))))))) ƒ ƒ B):/ /)/A ‹!!6-(34&)7%'G"7!%"6)))))))))))))))))))))))))))))))M ƒ ƒ B):Q /)hB aµeµd½ O7#!T' &#-3%((6))))))))))))))))))))))))))))))))))V)C ƒ ƒ B)BhA /)B/ O($%3#"!33464&;))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ B)B:V /)CA O($%3#4&3%#4&;464&;./:)A 760)))))))))))))))))))))) ƒ ƒ B):V /)CA W1 m8737 9 L$&!34'5!% 7!%"6+4#$5%'"-%;6)))))))))))))))))))))))))))))))) ³††‡€´µ}} g333!547"-3!!5433))))))))))))))))))))))))))))))))))))))))))))))))))))) %##4'%((34'%#4!&(#!/BB )))))))))))))))))))))))))))))))))))))) %##4'%((34'%#4!&¶/BB )))))))))))))))))))))))))))))))))))))))))))) +%33%((34'%#4!&-6&(%'G6)))))))))))))))))))))))))))))))))))))) L"34#-?(%&66)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))

Page 104 of 168

08-NOV-2019 SUTHAR KETANBHAI (C360) 104 of 168

Page 21 of 82

Page 105 of 168

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

01234678429  7 381 938 797 796

171  2318728 18371

Æ

X21i 7 7929 j9 2379 231872 kW1 79l21 2u¾¿ÀÁÂÀÃÄÅx W1 m8737 9 *%"67!%"6464&;)))))))))))))))))))))))))))))))))))))))))))))))// ‹!!6-6"!(-:BB ))))))))))))))))))))))))))))))))))))))))):Q ‹!!6-7,3 :BB -3%((6))))))))))))))))))))))))))))))))))))))))))/h :QB -3%((6))))))))))))))))))))))))))))))))))))))))))/@ ‹!!6-(31+!!6-3%((6))))$))-)4)))))))))))))))))))))))))))))@)Q O3 4& -#3-!",4&13- !,"$%#$4&;))))))))))))))))) $!33!+=7%'G6))))))))))))))))))))))))))))))))))))))))))))))))))))))) 4&3%#4&;=7!%"6=7%'G6)))))))))))))))))))))))))))@)Q 5!43=7%'G6))))))))))))))))))))))))))))))))))))))))))))))))@)Q O"'$4#'#"%3.!6%=34 53!%#0;3% 7 79 18291 ¸%(!"=(" %7353#)))))))))))))))))))))))))))))))))):))))))))))))))))))))))))) ¸%(!"Ç%3-:3%1"!5!((6B)AhG;T 53#))))))))))))))))) ¸%(!"Ç%3-(3%#4'543 ))))))))))))))))))))))))))))))))))))))))))))))))))))))) ²797 Ȳ 879 231872 g%"(#%&6"7!&66"#$%&(%6))))))))))))))))))))))))/@ g%"(#%&6"77"(%6.!&=(4'0))))))))))))))))))))))))@)Q L43'%"(#+4#$"77"(%6)))))))))))))))))))))))))@)Q#!/:)A ‰4&!3 T'!"G#43))))))))))))))))))))))))))))))))))))))))))))))))))V)C L¸gT"77"53!!"'!,"4&;)))))))))))))))))))))))))))))))))))))))))))))))))) "77"#43)))))))))))))))))))))))))))))))))))))))))))))))))))))))))):Q #""%RR!)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))):Q 132 .<g$%(#"hh-N%73h0 \ z79 O7#!T' &#$4&;3)))))))))))))))))))))))))))))))))))))))))))))))))))) O($%3#.74# &+4#$4&"#54330))))))))))))))))))))))))))))))))))))))))) O($%3#"!33"!!54&;))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) O($%3#$4&;3)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) S43#=("!!54&;)))))))))))))))))))))))))))))))))))))))))))))))))))))))/B `%#4'%($%3#.$%,1-:BD;"4#0)))))))))))))))))))))))))))))))))))))))) _6#$%#'$)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) _!!54&;53#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) <3%#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/h <#"%+#$%#'$))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ‹!!6$4&;3-(3%4&%&6(3%#4'=543=5%'6))))))))))))))))))))))) 2 31879 231872 g &#(3%#"-%&6%;;";%#))))))))))))))))))))))))))))))))))))))))))) <%&6%;;";%#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))/B ))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))):B ‚1( (3%#")))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ‰4;$#+4;$#%;;";%#)))))))))))))))))))))))))))))))))))))))))))))/h ))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/V !&#%33%#$))))))))))))))))))))))))))))))))))))))))))))))))))))))/@ L"34#%;;";%#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) <%&6%;;";%#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) !&#%33%#$))))))))))))))))))))))))))))))))))))))))))))))))))))))/@ ¸" 4'34#%;;";%#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))

W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 op tpuvwx u vwxpt o{puovwx \1z1819m1 ƒ ƒ B)/: /)/A ƒ ƒ B)/C /)/A ƒ ƒ B)/C /)/A ƒ ƒ B)/M /)/A ƒ ƒ B)/B /):: ƒ ƒ ƒ B)// /)::4 ƒ ƒ B)h: /)hC ƒ ƒ B)Q: ƒ :QBB /)B ƒ B)MC ƒ ƒ B)B// ƒ ƒ ƒ B):/ ƒ ƒ ƒ …;34;473 ƒ //B ƒ B)C: ƒ …E
L"34#(3%#"))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) L3(7!%"6!"(%("(3%#"))))))))))))))))))))))))))))))))))))))))))))))))))) <%&6T' &#(3%#"-'!&64#4!&6)))))))))))))))))))))))))))))))))))))))) <%&6T' &#T34(3%#"-'!&64#4!&6)))))))))))))))))))))))))))))))) <%&6T;1( .hÇ/0(3%#"-'!&64#4!&6)))))))))))))))))))))))))))))) 2 98n 231872 Éc‡†dfº€Êdµb‡ S"4'G-54"6'3%1))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) :CBB ::CB :BMB /@:B

ƒ B)Ch B)QM /)/Q ƒ ƒ ƒ B)/@ B)B@ /):B ƒ B)BA ƒ B)A: ƒ ƒ B)hM B)CV A:B A:B ƒ B):: B)M/ ƒ B)/C B):B B):Q B):V B)hB B)BM B)/@ B)BA B)Vh B)CM B)VQ

B)BhA ƒ ƒ ƒ B)B:A B)BAM B)BQ@ ƒ ƒ ƒ B)BB@ ƒ B)/VV ƒ B)B/h B)B:V ƒ ƒ ƒ ƒ B)BMh ƒ ƒ B)B:h ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

/)BB ƒ ƒ ƒ /)Q/ /):V /)CA ƒ ƒ ƒ /):V ƒ /)hB B)MC B)MC B)MC ƒ ƒ B)BQV B)BVV ƒ /)hC B)MC ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ ƒ

/):/#!/)CA /)BA#!/)hB B)@:#!/)/: B)M/#!B)@M

ƒ ƒ ƒ ƒ

ƒ ƒ ƒ B)MB

08-NOV-2019 SUTHAR KETANBHAI (C360) 105 of 168

Page 22 of 82

gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 ƒ ƒ gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 gES<„.:BBV0 ¸%3!"./@MM0 ¸%3!"./@MM0 ¸%3!"./@MM0 ¸%3!"./@MM0

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

i±

±iq6[0\6Z029  o²9 21932 u[jx X21i 7 7929 j9 2379 231872 kW1 79l21 2u¾¿ÀÁÂÀÃÄÅx

W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 op tpuvwx u vwxpt o{puovwx \1z1819m1 /AVB B)A/#!B)MQ ƒ ƒ ¸%3!"./@MM0 /VBB B)V/#!B)AC ƒ ƒ ¸%3!"./@MM0 /CCB B)Q:#!B)V: ƒ ƒ ¸%3!"./@MM0 /:MB B)Ch#!B)Qh ƒ ƒ ¸%3!"./@MM0 //:B B)hV#!B)CQ ƒ ƒ ¸%3!"./@MM0 ƒ ƒ B)/C B)MM _!+31%&6O3;"&./@hA0 ƒ ƒ B):B ƒ _!+31%&6O3;"&./@hA0 ƒ ƒ B):A ƒ _!+31%&6O3;"&./@hA0 ƒ ƒ B)hh ƒ _!+31%&6O3;"&./@hA0 ƒ ƒ B)h@ ƒ _!+31%&6O3;"&./@hA0 ƒ ƒ B)CC ƒ _!+31%&6O3;"&./@hA0 MBB B):B ƒ ƒ K %"%&./@@V0 AAB B):: ƒ ƒ K %"%&./@@V0

W1 m8737 9

g3%1#43-$!33!+ /'336())))))))))))))))))))))))))))))))))))))))))))))))))))))))))AQ ))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))/BB :'336())))))))))))))))))))))))))))))))))))))))))))))))))))))/QB )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))):BB )))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))):QB h'336())))))))))))))))))))))))))))))))))))))))))))))))))))))hBB ‰4;$#+4;$#7"4'G)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) ˆdÌfb€}†Ì~‡5-; ‰4#!&%;;";%# ƒ ·:BB -/V)hG;-::BBG;Th'!&'"#-:'!"))))))))) ƒ +4#$("34#=54336'!")))h))))))))))))))))))))))))))))))))))))))))) ƒ ƒ ·hBB -:QG;-::BBG;T '!&'"#-:'!")))))))))))) ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ …!" %3=+4;$#%;;";%#.%&6%h&6;"%,30 ƒ ·:BB -/VG;-:/BBG;T '!&'"#-:!"h'!"Í ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!"h)))))))))))))))))))))))))))))))))))) ƒ ƒ ƒ ·hBB -::)AG;-:BBBG;T '!&'"#-:'!"))))))) ƒ `64 =+4;$#%;;";%#.'! 74&%#4!&h!5&!" %3%&634;$#+4;$#%;;";%#0 ƒ ·:BB -/hG;-/QQB#!/MBBG;T '!&'"#-:!"h'!" ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!")))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$!366=„L<=54336.7%60'!"))))))))))))))))))))) ƒ ƒ +4#$!366„L<4&"#4&'!")))))))))))))))))))))))))))) ƒ ƒ ‰!+= %%;;";%#.?(%&66$%:3-'3%1-3%#!"3%;-( 4'0 ƒ ·/QB -A/T:G;-/CBBG;T '!&'"#-:!"h'!" ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!"))))))))))))):))))))))))))))))))))))) ƒ ƒ ƒ :BB -M#!/BG;-//QB#!/hMBG;T '!&'"#))))) ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!")))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$!366=„L<=54336.7%60'!"))))))))))))))))))))) ƒ ƒ +4#$ˆ>5!% =54336'!"))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$!366„L<4&"#4&'!")))))))))))))))))))))))))))) ƒ ƒ ƒ hBB -/VG;-/CBBG;Th-'!&'"#-:!"h'!")))) ƒ +4#$("34#=54336'!")))))))))))))))))))))))))))))))))))))))))))) ƒ ƒ +4#$," 4'34#=54336'!")))))))))))))))))))))))))))))))))))) ƒ ƒ <#!&-34-!"%&6))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) :MMB /B)C Î%"#R4#4'%&6%&6#!&)))))))))))))))))))))))))))))))))))))))))))))))))))))) :QVB V): ::CB h)CV /@:B /)MM g%3'4#4'-6!3! 4#4'-34#!&-%"73-%&6;"%&4#))))))))))))) :MMB C)hh :QVB h)/A ::CB :)h/ /@:B /)Q@ /VBB /)/Q ‚1( (%"#4#4!&#43 AQ71hBB71AVB -!346)))))))))))))))))))))))))))))))))))))))) ƒ ƒ C'33))))))))))))))))))))))))))))))))))) ƒ ƒ /BB71hBB71AVB -h'33)))))))))))))))))))))))))))))))))))) ƒ ƒ ‰4#!&)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) :CBB B)QA :VBB B)@h ˆdÌfb‡4 <%&6%&6;"%,3!"#!&%;;";%#'!&'"#))))))))))))))))))))) :CBB /)C#!:)@ .'!&'"#+4#$¶QBD2%"#R!"2%"#R4#%&6$%, ::CB /)h#!:)V '!&6'#4,4#44&$4;$"&6!5"%&;0 :BMB /)B#!/)@ ‰!+= %%;;";%#!"34#!&'!&'"#))))))))))))))))))))))) /@:B B)@#!/)h ?(%&66$%3-'3%1-!"3%#9?(%&6h63%;9'4&6"9 /VBB B)VM#!B)M@ ( 4'.+4#$6&4#1(#!/VBBG;T 09'!"4%.%&66 /:MB B)CM#!B)Q@ '!&'"#$%,'!&6'#4,4#44&$4;$"&6!5"%&;0 @VB B)hB#!B)hV VCB B)/M

Page 106 of 168

ƒ ƒ B)hA ƒ ¸%3!"./@MM0 ƒ ƒ B)VQ ƒ ¸%3!"./@MM0 B):B#!B)/A B)@: ¸%&‚ ./@MQ0 B)hQ ƒ ¸%&‚ ./@MQ0 B)hC#!B):C ƒ ¸%3!"./@MM0 B):/A B)@: ¸%3!"./@MM0 B)hB#!B):: ƒ ¸%&‚ ./@MQ0 B)VQ#!B)C/ ƒ ¸%&‚ ./@MQ0 B)QM ƒ ¸%&‚ ./@MQ0 B)QV ƒ ¸%&‚ ./@MQ0 B)CA ƒ ¸%&‚ ./@MQ0 B)hC#!B):@ ƒ ¸%&‚ ./@MQ0 B)AC ƒ ¸%&‚ ./@MQ0 B)Qh ƒ ¸%&‚ ./@MQ0 B)QV#!B)hh B)MM ¸%&‚ ./@MQ0 /):B#!B)AA ƒ ¸%&‚ ./@MQ0 B)@h#!B)V@ ƒ <$#%3)./@A@0 B)MQ ƒ <$#%3)./@A@0 B)A@ ƒ <$#%3)./@A@0 B)V: ƒ <$#%3)./@A@0 B)CV#!B)CB ƒ ¸%&‚ ./@MQ0 /)V#!/)/ ƒ ¸%&‚ ./@MQ0 /)B ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ B)MM ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ B)MM ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 B)::: B)A@ _!+31%&6O3;"&./@hA0 B):hM ƒ _!+31%&6O3;"&./@hA0 B):@C ƒ _!+31%&6O3;"&./@hA0 ƒ B)MC K %"%&.:BB:0 ƒ B)MC K %"%&.:BB:0 ƒ ƒ ¸%3!"./@MM0 ƒ B)MB#!/)BB¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ B)MC ¸%3!"./@MM0 ƒ B)MC ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0 ƒ ƒ ¸%3!"./@MM0

08-NOV-2019 SUTHAR KETANBHAI (C360) 106 of 168

Page 23 of 82

Page 107 of 168

Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

01234678429  7 381 938 797 796

171  2318728 18371

ii

X21i 7 7929 j9 2379 231872 kW1 79l21 2u¾¿ÀÁÂÀÃÄÅx

W19 73qn4  9 m37r73ns4\1 7 329m1y4[1m7z7m01234 W1 m8737 9 op tpuvwx u vwxpt o{puovwx \1z1819m1 ‚1( T547"'!&'"#.MA)QD;1( -/:)QD+!!6'$4(0 MBB B):C ƒ B)MC _!+31%&6O3;"&./@hA0 g &#T34-!"#%"-%&6#''!))))))))))))))))))))))))))))))))))))))))) /@:B /)CB ƒ ƒ ¸%3!"./@MM0 /VBB B)@A ƒ ƒ ¸%3!"./@MM0 /:MB B)VQ ƒ ƒ ¸%3!"./@MM0 L"34#-," 4'34#-%&6(!31#1"&7%6))))))))))))))))))))))))) MBB B):V#!B):A ƒ ƒ ¸%3!"./@MM0 VCB B):B#!B):: ƒ B)Vh#!B)@V¸%3!"./@MM0 CMB B)/V ƒ ƒ ¸%3!"./@MM0 h:B B)/: ƒ ƒ ¸%3!"./@MM0 >!% '!&'"#)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /@:B B)AQ ƒ ƒ ¸%3!"./@MM0 /VBB B)VB ƒ ƒ ¸%3!"./@MM0 /:MB B)CC ƒ ƒ ¸%3!"./@MM0 //:B B)hV ƒ ƒ ¸%3!"./@MM0 >!% '!&'"#%&6'333%"'!&'"#)))))))))))))))))))))))))))))))) @VB B)hB ƒ ƒ ¸%3!"./@MM0 VCB B):B ƒ ƒ ¸%3!"./@MM0 h:B B)/: ƒ ƒ ¸%3!"./@MM0 O"%#6'!&'"#.!,&=6"460))))))))))))))))))))))))))))))))))))))))))))ChB#!MBB B):B ƒ B)MC K %"%&./@@V0 L!31#1"&'!&'"#.!,&=6"460)))))))))))))))))))))))))))))))))))))):QQ#!MBB B)hA ƒ B)MC K %"%&./@@V0 L!31 "'!&'"#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /@QB /)VC ƒ ƒ K %"%&./@@V0 ::BB /)Bh ƒ ƒ K %"%&./@@V0 L!31 "' &#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) /MAB B)AM ƒ ƒ K %"%&./@@V0 <3%;'!&'"#))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))) @VB B):: ƒ ƒ N!3!G4%&#%3./@AB0 /:MB B)h: ƒ ƒ N!3!G4%&#%3)./@AB0 /VBB B)Ch ƒ ƒ N!3!G4%&#%3)./@AB0 :BBB /):h ƒ ƒ N!3!G4%&#%3)./@AB0 t

./:D!4#"'!&# ƒ Ñ Ñ /)VhG ‹43G./@A@0 ÏcfeІ†e‡ J%G))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))VVB#!AQB B)/V#!B)/M ƒ ƒ g%"6&%%&6S473./@MA0 S4"'$))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))VMB#!A:Q B)/A#!B)/M ƒ ƒ g%"6&%%&6S473./@MA0 `%(3)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))VhQ#!ABB B)/V#!B)/A ƒ ƒ g%"6&%%&6S473./@MA0 O$)))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))))V/Q#!VAB B)/Q#!B)/V ƒ ƒ g%"6&%%&6S473./@MA0 a†´bІ†e‡ Ñ Ñ Ñ /)VhG ‹43G./@A@0
%¸%3 %"5!"%&# ("%#"!5:CŠg)_("&#%#4,,%35!"6"1%#"4%3%"4&#&66 4¸4&13('454'$%#Õ/)BGÖT.G;UK0 %64;&.&!#('454'%#4!&0,%35!"%#"4%34&&!" %3)N$" %3,%3!54&3%#4&; 8<O6% ./@A/0-`%'‰%&./@C/0-%&6‹43G./@A@0)g!&6'#4,4#1,%3

%#"4%3 %16455"5"! 64;&,%36(&64&;!&4&=4#("!("#4.);)-6&4#1%&6 !4#"'!&#&#-!"4&#%#4!&-#')0%&6 %&5%'#"4&;,%"4%7434#1)>!"("!("#4!5('454' ("!6'#-,%3((34671%&5%'#""!"&74%6##) 7<1 7!3 Ó%3!6#!"("&##$" %3'!&6'#4,4#1) 'P! &!#4&'36(%("7%'G4&;%&65%'4&;-45%&1)‹$"4&3%#4!&5!" 7!&6%"1."53'= #4,!"!#$"+40!5%4"(%'-N%73:%&6h5!"4&3%#4&;,%3!5%4"(%'+4#$%(("!= ("4%#55'#4, 4##%&'%&6# ("%#"'!&64#4!&!5(%') 6g!&6'#4,4#1,%"4+4#$547"64% #".g$%(#":Q0)S%##-73%&G#-%&63!!=5433 4&= "%3547"4&3%#4!&%" %&5%'#"6#!%'$4,('4546_=,%3-#$!#'! !&!5 +$4'$%"34#64&#$#%73)S'%!56455"&'4&%&5%'#"4&;("!'%&6%#"4= %3-#$("!6'##$4'G&-6&4#4-%&6#$" %3'!&6'#4,4#4,%"1!,"'!&46"%73 "%&;5!"%('4546_=,%3) E&3%#4&; ,%3!5%'!#4'%3#43,%"1-6(&64&;!&6&4#1!57!%"6%&6!&#1(-4R-%&6 6  ( # $  ! 5  (  "5!"%#4!&) 5¸%35!"5331;"!#673!'G %17%(("!?4 %#64&;,%35!"'!&'"#+4#$4 43%" &4#6&4#1) ;¸%3 5!"'!&'"#73!'G%&6'!&'"#%"%#!4#"'!&#&#"("&#%#4,!5&!" %3) $¸%35!"#%3!",4&13464&;%((346!,"53%#"5%',%"1+4631-6(&64&;!&,= 3%#4!&!5#$%4"(%'7&%#$#$464&;9+$#$"%4"(%'4"53'#4,!"&!&"53'#4,9%&6 !&#$4'G&-#1(-%&6%((34'%#4!&!54&3%#4&;7%'G4&;=7!%"66)¸%3%"%,"%;5!" %64;&;46-%&6+"!7#%4&65"! ,"%3;%"66$!#7!?##.O
Page 24 of 82

34#6%"5!"$%##"%&5"%'"!#$;"%4&)N$" %3'!&6'#4,4#1!5+!!6,%"4 34&%"31+4#$6&4#1-%&66&4#1"%&;34#6%"#$!&!" %3315!&65!"+!!6 ('4;4,&)E56&4#1!5+!!6('44&!#G&!+&- %&'!&6'#4,4#1 ,%3)>!"?#"%(!3%#4!&#!!#$"!4#"'!&#&#-#$5!33!+4&; (4"4'%32%= #4!&6,3!(671‹43G./@A@0%176Ç ß=/=)=M=A==C==Ý===/=B==Ü=:==Þ==Q==)A==Q=h===Ý==/==B=Ü=C==É==à==×= ~Õ B)/A@/Þ= /ÞB)B/É +$"×46&4#1!5!4#+!!64&G;T h-%&6É4!4#"'!&#&#4&("'&#) G>"! ‹43G./@A@0-%& (4"4'%32%#4!&5!"('454'$%#!5 !4#+!!6%# :CŠg4%5!33!+Ç Ì¹ Õ =ß=B=ß)=:/=@==Þ@==BÞ==)B=B=/)=B=É/==Éà===àÞØ̹ +$"Ø̹%''!&#5!"$%#!5!"(#4!&%&646&!#671 Ø̹ á Éß/)@:/Ý/BÜhÜh)/VMÝ/BÜQÉà +$"É4!4#"'!&#&#4&("'&#71%) 3S3%&G(%'4&"5"&''!3 &4&64'%#$4#!"4'%3,%35"! (",4!,!3=  !5ÙaÏÚÙۀÏcde††~)
Ž‘’“”‘‘“•”–”—‘˜™‘š›œ˜‘Žž›—ŽžŸ ‘¡›œ˜• ¢£œž“¤•™œ¥¤‘¦›§“•ž˜™–‘¨ž˜”©‘ª«¬«­®¬¯

±

±iq6[0\6Z029  o²9 21932 u[jx

X21° Xn7m2628193XÈ182 9 m37r73nl21  z 8[ 7 4tpuvwx

X21i± [8z2m1²7 1zz7m7193 p\1 7 329m1

[8z2m1Z73329m14ä \1z1m37r1 W781m37 9 Ò ä98å1z±1Æm±37r1 äå±± äå±±æ z 0123² ã ç y ç y ç yÂ

\1m 19 1 l21 z 8W1 792 Ò 82\291 Y ã 07Èm B)V#!:)Q B)AM :):Q B)@#!:)Q /)VC :):Q B)@#!/)V /)/: /)QV B)@#!:)Q B)@Q :):Q

 737 9 z [8z2m1 j9 8 *!"4R!&#%3 ˆ(+%"6 @):V B)// Q)/A B)/@ C)h: B):h <3!(4&;%#CQŠ ˆ(+%"6 @)B@ B)// Q)BB B):B C)/Q B):C %_%!&%73 ,%35!"+$&&!4#=!"!43=('454'6%#%%"%,%43%73) *!"4R!&#%3 M):@ B)/: C):B B):C h)hQ B)hB 7`!6"%#31'!&",%#4 ,,%35!" 4&4  $%#3!#$"!;$!43.);)-4&!43 ¸"#4'%3 $%#?'$%&;"!"%"#$='!&#%'#'!!34&;'%3'3%#4!&0)¸%3%"5"! <%3! !&%&6 <3!(4&;%#CQŠ P!+&+%"6 A)QB B)/h h)C/ B):@ :)QV B)h@ `%"3!+./@M@0) *!"4R!&#%3 P!+&+%"6 V)/h B)/V :)/B B)CM /):Q B)MB '`!6"%#31 '!&",%#4,,%35!"%?4  $%#3!#$"!;$!43.);)-4&(%G ]3 8.%&1(!4#4!&0 ç¿ y¿ +4&#"$%#3!'%3'3%#4!&0)¸%3%"5"! <%3! !&%&6`%"3!+./@M@0) ‹4 & 6  . 5 ! "  +4 & #  " 0  O& 1 h C)B B)BhB ƒ ƒ ƒ ƒ X21Æ Xn7m2628193XÈ182 9 m37r73nl21  %#V)AT z 8\ mo 4tpuvwx ‹4&6.5!" "0 O&1 ::)A B)BCC ƒ ƒ ƒ ƒ %#h)CT Ò 82\291 è†b‡Ç L 4'-#55-!7464%& B)Q#!:): /)<":5%''!&6'#%&'¼µ%&6¼†%"64&‹T. :UK09"4#%&'Úµ%&6چ4& . UK0T‹) S%%3# B)Q#!:)V :)…!"5%'$%7!#$%&%4"(%'"4#%&',%3%&6%"5%'"4#%&',%3) <$%3 B)@#!C)B h)g!&6'#%&'%"5!""5%'!5#$#%#6 4##%&'5%'4&;,4"#%373%'G7!61"= "!&64&;%#% # ("%#"%% 74&#%4")¸%37%6!&"5%'T%4"# ("%= ‚"%&4# /)A#!C)h #"6455"&'!5Q)VK%&6"5%'# ("%#"!5:/Šg) ‰4#!&-6!3! 4#-%"73 /):#!C)h C)<g$%(#"C5!"!"6#%4364&5!" %#4!&) Î%"#R!%&6#!& /)C#!A)M Q)g!&6&%#'%&$%,4;&454'%&#55'#!&"5%' 4##%&'.N%73:0)O3!-!?4=

<%&6 <43# g3%1 ‰!% 

O$%#53!+#$"!;$!43- !4#"#&6#! !,%+%15"! #$$%#!"')N$4!4#"4;"%#4!&("!,464&4#4%3%#"%&= (!"#!5$%#-7#4#%3!6"4#$!43%68%'&##!#$$%#!"'-#$ 3!+"4&;#$%((%"&##$" %3'!&6'#4,4#14&#$%#R!&!5!43) N1(4'%331-+$&!#$"5%'#!"%"$36'!&#%&#-~4&'"%+4#$ !4#"'!&#&#%&6+4#$6"16&4#1!5%!43-7#6'"%+4#$ 4&'"%4&;!";%&4''!&#&#!5%!43%&65!"&45!" ;"%6%#4!&%&6 "!&66!43;"%4&.7'%;"%4&=#!=;"%4&'!&#%'#%""6'60) N$~!5%5"!R&!43%17$4;$"!"3!+"#$%&#$%#!5#$%  &5"!R&!43.7'%#$'!&6'#4,4#1!54'4$4;$"#$%&#$%#!5 +%#"7#3!+"#$%&#$%#!5#1(4'%3!43;"%4&0)P455"&'4&~ 73!+ !4#"'!&#&#!5A#!MD%"24# %33)O#%(("!?4= %#31/QD!4#"'!&#&#-~%1,%"1(#!hBD5"! &5"!R& ,%3) ‹$&'%3'3%#4&;%&&%3&";1-'$!!,%3#$%#"("= &##1(4'%3%&4#'!&64#4!&)E&'34%#+$";"!&65"R4&; 44;&454'%&#-%''"%#$%##"%&5"43%#4!&$!364&'36#$ 55'#!5#$3%#&#$%#!554!&!5+%#")„&";1"3%66"4&; #$4($%'$%&;4;&454'%"#%"6#$("!;"!5#$5"!#5"!&# 4&!4#!43) >!"5"#$"4&5!" %#4!&-g$%(#"/A-+$4'$4&'36% #$!65!"#4%#4&;$%#3!#$"!;$5!&6%#4!&)

[â\²6Z²jY ]Z²²jjZÒX[p \Z[j[X6ÒZ[

O?(3%4&64&g$%(#":Q-#$!,"%33#$" %3"4#%&'!5%& % 731'! ("44#"5%'=#!="5%'#$" %3"4#%&'ڇ %&6#$"5%'543 "4#%&'7#+&#$% 731F"5%' %&6#$4&#"4!"%&6?#"4!"&,4"!& &#.Ú%&6Ú0)N%73/B ;4,#1(4'%3,%35!"#$"5%'543 '!554µ'4&#¼†µ%&6¼†%&6 #$4""'4("!'%3-#$"5%'"4#%&'Úµ€%&6چ)O$!+&-#$ 4&6!!",%36(&6!&(!4#4!&!5#$"5%'-64"'#4!&!5$%# #"%&5"-%&6#$"5%'F3!&;=+%, 44,4#1)J#6!!"-#$,%3= 6(&6!&%4"(6%&6#$"5%'F3!&;=+%, 44,4#1) N%73/B"53'##%&6%"64#%#4!&-+4#$%&% 6.%(("!?4= %#04&#"4!""5%'# ("%#""("&#%#4,!5+%33!""!!5 % 734)>!"4#%#4!&#$%#6,4%#7#%%3315"! #%&6%"6

Page 108 of 168

6%#4!&-'!""!4!&-%&6%'' 3%#4!&!56#%&664"#'%&6"% %#4'%3314&'"%"= 5%' 4##%&')„ 4##%&',%3!5B)BQ$!36!&3176+$"$4;$31"53'#4, "5%''%&7%4&#%4&6!,"#$",4'345!5#$% 731)

X21ii Z8 129[8z2m1²7 1zz7m7193 p\1 7 329m1

 737 9 z[8z2m1 j9 8 *!"4R!&#%3-3!(4&;#!CQŠ ¸"#4'%3-3!(4&;71!&6CQŠ ]3 8

W781m37 9 z ç4 y4 0123² ã tpu vwx u vwxpt ˆ(+%"6 /B B)/ P!+&+%"6 V B)/A O&164"'#4!& A)A B)/h :Q B)BC

'!&64#4!&-4&'364&;4&#"4!""5%'# ("%#"5!"5&#"%#4!& 1# -O<*_O„./@@M0!",%35"! g$%(#"/Q#!6#"= 4&#$"5%'543 '!554'4&#T"4#%&')N%73//34##$ #%&6%"6"5%'543 '!554'4&#,%364&„"!(%&#%&= 6%"6)

]WZ[6ÒW[X6ÒW6\W[

O<*_O„):B/B)„&";1#%&6%"65!"74364&;?'(#3!+="4"46%3 74364&;)O…<ETO<*_O„TE„<abcdecfe@B)/=:B/B) O<*_O„):BB@)g"4#"4%5!" !4#"='!&#"!364;&4&74364&;)O…<ET O<*_O„abcdecfe€/VB=:BB@) O
08-NOV-2019 SUTHAR KETANBHAI (C360) 108 of 168

Page 25 of 82

08-NOV-2019

Page 26 of 82

08-NOV-2019 SUTHAR KETANBHAI (C360)

Page 27 of 82

Page 111 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-3.1 ETD CALCULATION

1.ETD caln for blast proof building construction shall be included and same shall be considered for NHT-CRR building. 2.ETD caln for inside temp of 23 Deg C and 24 Deg C shall be included. (for Rack room and UPS room of SF for SS-86) 3. consider daily range of 11 deg F for all seasons as per ISHRAE 2014 4. Indicate building type suitably (i.e. blast proof/ Non blast proof )

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 111 of 168

Page 28 of 82

HEAT LOAD ESTIMATION FOR VRMP Equivalent Temp. Difference Calculations for "Indicate inside temp" HVAC Contractor- Advance Ventilation Pvt. Ltd.

Building type?

Daily Range in deg.F

Summer (˚F)= 20.52

Monsoon (˚F)= 15.66

Project: Vizag Refinery Modernization Project DBT in deg.F SUMMER

MONSOON

91.9

INDOOR

78.8

DIFFERENTIAL

13.1

OUTDOOR

87.1

INDOOR

78.8

DIFFERENTIAL

8.3

OUTDOOR

64.9

INDOOR

78.8

DIFFERENTIAL

-13.9

WALL

Wt. of Wall(lb/sq.ft)

ETD (deg.F)

N

100

4

-2.12

2

NE

100

10

-2.12

8

E

100

18

-2.12

16

SE

100

18

-2.12

16

S

100

16

-2.12

14

SW

100

14

-2.12

12

W

100

12

-2.12

10

NW

100

6

-2.12

4

ROOF

80

32

-2.12

30

WINTER

Page 112 of 168

OUTDOOR

CORRECTION FACTOR SUMMER

NET ETD(deg.F)

Design Inside Condition: Temp (˚F):

78.8

RH (%):

50

Remarks

ISHRAE Handbook Table1.21/1.22/1.23

MONSOON N

100

4

-4.55

-1

NE

100

10

-4.55

5

SE

100

18

-4.55

13

E

100

18

-4.55

13

S

100

16

-4.55

11

SW

100

14

-4.55

9

W

100

12

-4.55

7

NW

100

6

-4.55

1

ROOF

80

32

-4.55

27

ISHRAE Handbook Table1.21/1.22/1.23

# Taken reference of Visakhapatnam

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 112 of 168

Page 29 of 82

HEAT LOAD ESTIMATION FOR VRMP Equivalent Temp. Difference Calculations for "Indicate inside temp" HVAC Contractor- Advance Ventilation Pvt. Ltd.

Building type?

Daily Range in deg.F

Summer (˚F)= 20.52

Monsoon (˚F)= 15.66

Project: Vizag Refinery Modernization Project DBT in deg.F SUMMER

91.9

INDOOR

75.2

DIFFERENTIAL

16.7

INDOOR

75.2

Design Inside Condition: Temp (˚F):

DIFFERENTIAL

11.9

RH (%):

OUTDOOR

64.9

INDOOR

75.2

DIFFERENTIAL

-10.3

WALL

Wt. of Wall(lb/sq.ft)

ETD (deg.F)

N

100

4

1.48

5

NE

100

10

1.48

11

E

100

18

1.48

19

SE

100

18

1.48

19

S

100

16

1.48

17

SW

100

14

1.48

15

W

100

12

1.48

13

NW

100

6

1.48

7

ROOF

80

32

1.48

33

MONSOON

OUTDOOR

WINTER

Page 113 of 168

OUTDOOR

87.1

CORRECTION FACTOR SUMMER

NET ETD(deg.F)

75.2 50

Remarks

ISHRAE Handbook Table1.21/1.22/1.23

MONSOON N

100

4

-0.95

3

NE

100

10

-0.95

9

SE

100

18

-0.95

17

E

100

18

-0.95

17

S

100

16

-0.95

15

SW

100

14

-0.95

13

W

100

12

-0.95

11

NW

100

6

-0.95

5

ROOF

80

32

-0.95

31

ISHRAE Handbook Table1.21/1.22/1.23

# Taken reference of Visakhapatnam

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 113 of 168

Page 30 of 82

HEAT LOAD ESTIMATION FOR VRMP

3.2 HEAT GAIN FROM PEOPLE

From ISHRAE HVAC data book Table- 1.24

Degree of activity

Typical application

Office worker

Office, Hotels, Apts., college Dept. Retail or Variety Store

Standing, walking slowly

Page 114 of 168

Room Dry-bulb temperature (75 deg.F)

Metabolic rate(adult male Btu/hr) 475

Btu/hr Sensible

Btu/hr Latent

550

245

205

SOLAR HEAT GAIN FACTOR (Btu/Hr)(Sq.ft ) AT 200 EXPOSURE

SUMMER (MAY21) At 4pm*

MONSOON (AUG 24) At 4pm*

NORTH

23

11

NORTH EAST

12

11

EAST

12

11

SOUTH EAST

12

11

SOUTH

12

11

SOUTH WEST

85

113

WEST

163

165

NORTH WEST

138

118

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 114 of 168

Page 31 of 82

08-NOV-2019

Page 32 of 82

08-NOV-2019

Page 33 of 82

08-NOV-2019

Page 34 of 82

Page 118 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-4 HEAT LOAD CALCULATION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 118 of 168

Page 35 of 82

Page 119 of 168

HEAT LOAD ESTIMATION FOR VRMP

4.1.1 SUMMARY SHEET FOR SUBSTATION 86-CT BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 119 of 168

Page 36 of 82

Page 120 of 168

PROJECT : VIZAG REFINERY MODERNIZATION PROJECT OWNER : HINDUSTAN PETROLEUM CORPORATION LIMITED

CONSULTANT: ENGINEERS INDIA LIMITED

SUMMARY SHEET FOR SUBSTATION SS-86 (COOLING TOWER) BUILDING

Date: 03.10.19

J9

B15

B18

I108

I107

I109

Winter Load ( KW)

I110

Monsoon Heating ( KW )

I111

78.8 78.8 78.8 78.8

50.0 50.0 50.0 50.0

2.0 2.0 1.5 0.0

5605 590 120 0

21980 544 288 0

74.39 4.29 1.30 1.37

-11.16 -7.04 -0.68 0.00

11.39 1.18 0.21 0.00

-17.08 -1.80 -0.37 0.00

112000.00

4.00

6316

22812

81.35

-18.87

12.78

-19.25

44000 9000 1000 1000 0 0 0 55000.00

11000

3.0 0.0 4.0 3.0 0.0 0.0 0.0 10.00

1038 346 487 249 326 158 0 2603

9033 2034 918 632 562 348 0 13526

23.73 5.92 4.71 2.70 3.03 1.62 1.55 43.27

6.96 -0.33 -5.97 -2.91 -4.68 -2.35 0.00 -9.29

2.66 0.99 0.70 0.58 0.74 0.35 0.00 6.02

-3.16 -1.05 -1.48 -0.76 -0.99 -0.48 0.00 -7.93

167000.00

14.00

8919

36338

124.62

-28.16

18.80

-27.18

SUBTOTAL(A) SECOND FLOOR 5 6 7 8 9 10 11

RACK ROOM UPS ROOM TECH ROOM ENGINEER ROOM LOBBY 1 LOBBY 2 AHU ROOM SF SUBTOTAL(B) TOTAL(A+B)

14020.92 78.85 39.36 38.69 18.93 99.29 19.84 39.41

55.89 36.87 41.07 55.89 15.81 48.45 41.07

4221.16 1404.61 1542.25 1011.29 1569.72 961.35 1571.88 12282.25 26303.17

9.84 9.84 12.63 9.84 12.46 9.84 19.96

78.8 78.8 78.8 78.8 78.8 78.8 78.8

50.0 50.0 50.0 50.0 50.0 50.0 50.0

1.5 1.5 1.5 1.5 1.0 1.0 0.0

Second floor of building is Control room which is SRR for which Inside room temp of 23 deg C shall be considered.

08-NOV-2019 SUTHAR KETANBHAI (C360) 120 of 168

Page 37 of 82

Humidifier ( Kw)

H9

0.0 0.0 4.0 0.0

Unit Ref. Load

B58

Dehumidified Unit CFM

Fresh air ACPH

B59 111000 0 1000 0

fresh air CFM

Room Design RH in %age

D11 14.76 22.25 14.76 18.97

Room Design Temp. in deg. F

B12 11391.97 795.63 326.46 1506.85

Height ( Ft )

C11 50.59 20.57 16.73 38.61

Floor Area(sqft)

B11 218.42 38.69 19.52 39.03

Width(Ft)

Occup. (Persons)

B10 FIRST FLOOR SWITCHGEAR HALL SWITCHGEAR HALL GIS PANELS OPERATOR ROOM AHU ROOM FF

Eqip. Load(W)

1 2 3 4

Length(Ft)

S.no

Area Description

Rev. 00

Page 121 of 168

HEAT LOAD ESTIMATION FOR VRMP

4.1.2 CALCULATION SHEET FOR SUBSTATION 86-CT BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 121 of 168

Page 38 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT SWITCHGEAR HALL

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

SWITCHGEAR HALL

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

218.42

50.59

14.76

MONSOON

DESIGN CONDITIONS

ROOM AREA

11391.97 Sq.ft

INDOOR

ROOM VOLUME

168145.44 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

2.00

17.00

cfm/per

5604.85

Cfm @ AC/Hr

0.00

Cfm @ Occup

FRESH AIR

5604.85 Cfm Selected

GLASS AREA

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

73.7 -17

BF

0.12 Occupant Heat

Sens

245.00

1-BF

0.88

Lat

205.00

N

NE

E

SE

S

SW

W

NW

8.53

0.00

0.00

0.00

8.53

0.00

0.00

0.00

H

1.97

0.00

0.00

0.00

1.97

0.00

0.00

0.00

QTY

Gr/LB 150.0

50.0

L

All Glass 67.13

2.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

33.57

0.00

0.00

0.00

33.57

0.00

0.00

0.00

Partition

L

156.62

0.00

0.00

0.00

138.74

0.00

0.00

0.00

177.12

H

14.76

14.76

14.76

14.76

14.76

14.76

14.76

14.76

14.76

0.00

0.00

0.00

2014.30

0.00

0.00

0.00

2614.29

AREA WALL AREA

WINTER

RH

1

NETT AREA 2278.14

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Area

U

Sum

Mon

Win

Sum

Mon

Win

34

1.00

23

11

0

772

369

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

34

1.00

12

11

0

403

369

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

1542

-451

-11367

0

0

0

0

0

0

0

0

0

N

S

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

ETD values as per daily range of 11 shall be revised

2278

0.36

2

-1

-14

NE

0

0.36

8

5

-14

E

0

0.36

16

13

-14

SE

0

0.36

16

13

-14

2014

0.36

14

11

-14

10065

8303

-10051

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

S

Trans. Gain-Except Wall & Roof All Glass

67

1.13

13

8

-14

997

628

-1051

Partition

2614

0.32

8

3

-9

6810

2744

-7412

Ceiling

2028

0.29

8

3

-9

4788

1929

-5212

11392

0.36

8

3

-9

33383

13452

-36336

Floor

Internal Heat Occupants (Nos.)

0

245

0

0

0

Power (W)

111000

3.40

377400

377400

188700

Lights (W)

5294

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 122 of 168

17998

17998

8999

454158

422742

126270

510928

475585

126270

9545

6014

-10068

520473

481599

116203

12.5%

08-NOV-2019

5604.85

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 122 of 168

Page 39 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT SWITCHGEAR HALL Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

5604.85

0.12

76

85

-17

0.68

0

0

0

34896

38738

-7912

ERLH

34896

38738

-7912

ERTH

555369

520337

108290

Outdoor Air(S)

5604.85

0.88

13

8

-14

1.08

69995

44106

Outdoor Air(Lt)

5604.85

0.88

76

85

-17

0.68

255906

284079

-58023

GTH

881269

848522

-23563

Refrigeration Load

881269

848522

-23563

Monsoon Reheat

-73830

38873

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

9241

5328

890511

892724

74.21

74.39

Winter KW

-14485

-11.16

Monsoon Heaters (KW)

11.39

ESHF =(ERSH/ERTH)

0.94

0.93

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

21980

20433

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-17.08

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-27.84

Final Values: Selected Load (TR)

74.39

Selected Airquantity (CFM)

21980.31

Winter Load (KW)

-11.16

Monsoon Heating (KW)

11.39

Humidifier (KW)

-17.08

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

156.62

0.00

0.00

0.00

138.74

0.00

0.00

0.00

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

1148.15

0.00

0.00

0.00

1017.10

0.00

0.00

0.00

1298.43

NET AREA

Partition 177.12

Solar & Trans. Gain-Wall & Roof N

1148

0.36

2

-1

-14

777

-227

-5729

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

1017

0.36

14

11

-14

5082

4193

-5075

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

1298

0.32

8

3

-9

3382

1363

-3681

S

08-NOV-2019

Return Air Heat Load Gain

Page 123 of 168

SUTHAR KETANBHAI (C360)

U factor for Roof sun to be checked and corrected.

123 of 168

Page 40 of 82

9241

5328

-14485

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

OWNER

HPCL

PROJECT

VRMP

LOCATION ROOM NAME

comments provided on switch gear hall is also applicable for this DESIGN CONDITIONS area.SEASON

SUBSTATION 86 CT SWITCHGEAR HALL GIS PANELS

Sheet No. DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

SWITCHGEAR HALL GIS PANELS

DIFFERENTIAL

13.1

OUTDOOR

87.1

INDOOR

78.8

ROOM SIZE

SUMMER

38.69

ROOM AREA

795.63

ROOM VOLUME

20.57

22.25

MONSOON

Sq.ft

17706.67 Cu.ft

OCCUPANCY

0.00

AIR CHANGES

2.00

17.00

DIFFERENTIAL cfm/per

WINTER

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

590.22

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

590.22

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

8.53

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

1.97

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

67.13

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

38.69

0.00

0.00

0.00

20.57

H

22.25

22.25

22.25

22.25

22.25

22.25

22.25

22.25

22.25

NETT AREA

0.00

0.00

0.00

0.00

793.85

0.00

0.00

0.00

457.68

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

67

1.00

12

11

0

806

738

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

S

67.13

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

794

0.36

14

11

-14

3967

3272

-3961

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

S

Trans. Gain-Except Wall & Roof All Glass

67

1.13

13

8

-14

997

628

-1051

Partition

458

0.32

8

3

-9

1192

480

-1298

0

0.29

8

3

-9

0

0

0

796

0.36

8

3

-9

2332

939

-2538

0

Ceiling Floor

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

370

3.40

1257

1257

629

10550

7316

-8219

11869

8230

-8219

1005

633

-1060

12874

8864

-9279

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 124 of 168

12.5%

08-NOV-2019

590.22

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 124 of 168

Page 41 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT SWITCHGEAR HALL GIS PANELS Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

590.22

0.12

76

85

-17

0.68

0

0

0

3675

4079

-833

ERLH

3675

4079

-833

ERTH

16548

12943

-10113

Outdoor Air(S)

590.22

0.88

13

8

-14

1.08

7371

4645

Outdoor Air(Lt)

590.22

0.88

76

85

-17

0.68

26948

29915

-6110

GTH

50868

47503

-23998

Refrigeration Load

50868

47503

-23998

Monsoon Reheat

-7775

4010

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

0

0

50868

51513

4.24

4.29

0

Winter KW

-7.04

Monsoon Heaters (KW)

1.18

ESHF =(ERSH/ERTH)

0.78

0.68

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

544

376

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-1.80

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-2.93

Final Values: Selected Load (TR)

4.29

Selected Airquantity (CFM)

543.67

Winter Load (KW)

-7.04

Monsoon Heating (KW)

1.18

Humidifier (KW)

-1.80

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

38.69

0.00

0.00

0.00

Partition

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

20.57

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 125 of 168

0

SUTHAR KETANBHAI (C360) 125 of 168

Page 42 of 82

0 0

0

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise)

OWNER

HPCL

comments provided on switch gear hall is also SEASON DESIGN applicable for thisCONDITIONS area.

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

Appl. Room

SUBSTATION 86 CT OPERATOR ROOM

Sheet No. DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

OPERATOR ROOM

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

19.52

16.73

14.76

MONSOON

ROOM AREA

326.46

Sq.ft

INDOOR

ROOM VOLUME

4818.60

Cu.ft

DIFFERENTIAL

OCCUPANCY

4.00

AIR CHANGES

1.50

FRESH AIR

17.00

cfm/per

WINTER

RH

1 Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

120.47

Cfm @ AC/Hr

68.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

120.47

Cfm Selected

1-BF

0.88

Lat

205.00

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

14.76

14.76

14.76

14.76

14.76

14.76

14.76

14.76

14.76

NETT AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Partition

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Trans. Gain-Except Wall & Roof All Glass

0

1.13

13

8

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

0

Ceiling

0

0.29

8

3

-9

0

0

0

326

0.36

8

3

-9

957

385

-1041

Floor

Internal Heat Occupants (Nos.)

4

245

980

980

0

Power (W)

1000

3.40

3400

3400

1700

Lights (W)

152

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 126 of 168

516

516

258

5852

5281

917

6584

5941

917

205

129

-216

6789

6071

700

12.5%

08-NOV-2019

120.47

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 126 of 168

Page 43 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT OPERATOR ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

820

820

0

820

820

0

902

902

0

750

833

-170

ERLH

1652

1735

-170

ERTH

8441

7805

530

Latent Heat Occupants(Nos.)

4.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

120.47

0.12

76

85

-17

0.68

Outdoor Air(S)

120.47

0.88

13

8

-14

1.08

1504

948

Outdoor Air(Lt)

120.47

0.88

76

85

-17

0.68

5500

6106

-1247

GTH

15446

14859

-2304

Refrigeration Load

15446

14859

-2304

Monsoon Reheat

-1587

718

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

0

0

15446

15577

1.29

1.30

0

Winter KW

-0.68

Monsoon Heaters (KW)

0.21

ESHF =(ERSH/ERTH)

0.80

0.78

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

288

258

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.37

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-0.60

Final Values: Selected Load (TR)

1.30

Selected Airquantity (CFM)

288.04

Winter Load (KW)

-0.68

Monsoon Heating (KW)

0.21

Humidifier (KW)

-0.37

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 127 of 168

0

SUTHAR KETANBHAI (C360) 127 of 168

Page 44 of 82

0 0

0

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise)

OWNER

HPCL

PROJECT

VRMP

LOCATION ROOM NAME

comments provided on switch gear hall is also applicable for this area. SEASON DESIGN CONDITIONS

Appl. Room

SUBSTATION 86 CT AHU ROOM FF

Sheet No. DB

WB

OUTDOOR

91.9

82.0

SUBSTATION 86 CT

INDOOR

78.8

AHU ROOM FF

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

SUMMER

39.03

38.61

18.97

MONSOON

ROOM AREA

1506.85 Sq.ft

INDOOR

ROOM VOLUME

28592.25 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

0.00

17.00

cfm/per

WINTER

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

0.00

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

0.00

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

8.53

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

1.97

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

67.13

0.00

0.00

0.00

L

0.00

0.00

0.00

0.00

39.03

0.00

38.61

0.00

0.00

H

18.97

18.97

18.97

18.97

18.97

18.97

18.97

18.97

18.97

NETT AREA

0.00

0.00

0.00

0.00

673.49

0.00

732.53

0.00

0.00

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

67

1.00

12

11

0

806

738

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

S

67.13

Partition

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

673

0.36

14

11

-14

3365

2776

-3360

S SW

0

0.36

12

9

-14

0

0

0

733

0.36

10

7

-14

2605

1965

-3655

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

W

Trans. Gain-Except Wall & Roof All Glass

67

1.13

13

8

-14

997

628

-1051

Partition

0

0.32

8

3

-9

0

0

0

Ceiling

0

0.29

8

3

-9

0

0

0

1507

0.36

8

3

-9

4416

1779

-4806

0

Floor

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

700

3.40

2381

2381

1190

14570

10267

-11683

16391

11551

-11683

0

0

0

16391

11551

-11683

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 128 of 168

12.5%

08-NOV-2019

0.00

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 128 of 168

Page 45 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT AHU ROOM FF Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

0

0

0

0

0

0

ERLH

0

0

0

ERTH

16391

11551

-11683

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

0.00

0.12

76

85

-17

0.68

Outdoor Air(S)

0.00

0.88

13

8

-14

1.08

0

0

Outdoor Air(Lt)

0.00

0.88

76

85

-17

0.68

0

0

0

GTH

16391

11551

-11683

Refrigeration Load

16391

11551

-11683

Monsoon Reheat

0

4840

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

0

0

16391

16391

1.37

1.37

0

Winter KW

0.00

Monsoon Heaters (KW)

0.00

ESHF =(ERSH/ERTH)

1.00

1.00

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

0

0

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

0.00

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

0.00

Final Values: Selected Load (TR)

1.37

Selected Airquantity (CFM)

0.00

Winter Load (KW)

0.00

Monsoon Heating (KW)

0.00

Humidifier (KW)

0.00

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

39.03

0.00

38.61

0.00

Partition

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 129 of 168

0

SUTHAR KETANBHAI (C360) 129 of 168

Page 46 of 82

0 0

0

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

inside temp. for rack room of 23deg C to be SEASON DESIGN CONDITIONS considered SUMMER OUTDOOR

HPCL

PROJECT

VRMP

LOCATION

SUBSTATION 86 CT

INDOOR

78.8

ROOM NAME

RACK ROOM

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

78.85

55.89

9.84

MONSOON

ROOM AREA

4221.16 Sq.ft

INDOOR

ROOM VOLUME

41536.17 Cu.ft

DIFFERENTIAL

OCCUPANCY

3.00

AIR CHANGES

1.50

FRESH AIR

17.00

cfm/per

1038.40

Cfm @ AC/Hr

51.00

Cfm @ Occup

1038.40 Cfm Selected

GLASS AREA

DB

WB

91.9

82.0

RH

Gr/LB 73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

73.7 -17

BF

0.12 Occupant Heat

Sens

245.00

1-BF

0.88

Lat

205.00

N

NE

E

SE

S

SW

W

NW

3.94

0.00

0.00

0.00

3.94

0.00

0.00

0.00

H

5.90

0.00

0.00

0.00

5.90

0.00

0.00

0.00

QTY

1

150.0 50.0

L

All Glass 371.81

8.00

0.00

0.00

0.00

8.00

0.00

0.00

0.00

185.91

0.00

0.00

0.00

185.91

0.00

0.00

0.00

Partition

L

78.85

0.00

0.00

0.00

78.85

0.00

0.00

0.00

55.89

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

0.00

0.00

0.00

589.99

0.00

0.00

0.00

549.97

AREA WALL AREA

WINTER

RACK ROOM

Sheet No.

OWNER

ROOM SIZE

SUBSTATION 86 CT

NETT AREA 589.99

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Area

U

Sum

Mon

Win

Sum

Mon

Win

186

1.00

23

11

0

4276

2045

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

186

1.00

12

11

0

2231

2045

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

-117

-2944

0

0

0

0

N

S

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

590

0.36

2

-1

-14

NE

0

0.36

8

5

-14

E

0

0.36

16

13

-14

SE

0

0.36

16

13

-14

590

0.36

14

11

-14

SW

0

0.36

12

9

W

0

0.36

10

7

NW

0

0.36

4

4221

0.11

S

Roof Sun

ETD values shall be corrected for daily 399 range of 11 Deg F 0 and inside room temp 0 0 of 23 deg C

0

0

2948

2432

-2944

-14

0

0

0

-14

0

0

0

1

-14

0

0

0

30

27

-14

13874

12746

-6436

Trans. Gain-Except Wall & Roof All Glass

372

1.13

13

8

-14

5521

3479

-5823

Partition

550

0.32

8

3

-9

1433

577

-1559

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

Internal Heat Occupants (Nos.)

3

245

735

735

0

Power (W)

44000

3.40

149600

149600

74800

Lights (W)

1962

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 130 of 168

6669

6669

3335

187686

180211

58429

211146

202737

58429

1768

1114

-1865

212915

203852

56564

12.5%

08-NOV-2019

1038.40

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 130 of 168

Page 47 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT RACK ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

615

615

0

615

615

0

Latent Heat Occupants(Nos.)

3.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

1038.40

0.12

76

85

-17

0.68

677

677

0

6465

7177

-1466

ERLH

7142

7853

-1466

ERTH

220056

211705

55098

Outdoor Air(S)

1038.40

0.88

13

8

-14

1.08

12968

8172

-13678

Outdoor Air(Lt)

1038.40

0.88

76

85

-17

0.68

47411

52631

-10750

GTH

280435

272508

30669

Refrigeration Load

280435

272508

30669

Monsoon Reheat

9063

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

4347

2698

284782

284269

23.73

23.69

-6930

Winter KW

6.96

Monsoon Heaters (KW)

2.66

ESHF =(ERSH/ERTH)

0.97

0.96

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

CFM Dehum ={(ERSH)/(1.08*Deh Rise)}

9033

8649

Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-3.16

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-5.16

Final Values: Selected Load (TR)

23.73

Selected Airquantity (CFM)

9033.32

Winter Load (KW)

6.96

Monsoon Heating (KW)

2.66

Humidifier (KW)

-3.16

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

78.85

0.00

0.00

0.00

78.85

0.00

0.00

0.00

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

578.04

0.00

0.00

0.00

578.04

0.00

0.00

0.00

409.73

NET AREA

Partition 55.89

Solar & Trans. Gain-Wall & Roof N

578

0.36

2

-1

-14

391

-114

-2884

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

578

0.36

14

11

-14

2888

2383

-2884

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

410

0.32

8

3

-9

1067

430

-1162

S

08-NOV-2019

Return Air Heat Load Gain

Page 131 of 168

SUTHAR KETANBHAI (C360) 131 of 168

-Heat gain from roof sun to be considered. -ETD values shall be checked and corrected

Page 48 of 82

4347

2698

-6930

OWNER

HPCL

PROJECT

VRMP

LOCATION

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Comments provided on Rack room also Heat Load Calculations for Airconditioning system Location (Areawise) applicable for this area. Appl. Room - inside temp of 24 Deg C shall be considered. accordingly ETD values shall SEASON DESIGN CONDITIONS DB be corretced. SUMMER

OUTDOOR

91.9

SUBSTATION 86 CT

INDOOR

78.8

ROOM NAME

UPS ROOM

DIFFERENTIAL

13.1

ROOM SIZE

39.36

OUTDOOR

87.1 78.8

36.87

9.84

MONSOON

ROOM AREA

1404.61 Sq.ft

INDOOR

ROOM VOLUME

13821.36 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

1.50

WALL AREA

cfm/per

WINTER

UPS ROOM

Sheet No. WB

RH

82.0

Gr/LB 73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

345.53

Cfm Selected

1-BF

0.88

Lat

205.00

73.7 -17

N

NE

E

SE

S

SW

W

NW

L

3.94

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

5.90

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

1

150.0 50.0

345.53 FRESH AIR

GLASS AREA

17.00

SUBSTATION 86 CT

All Glass 92.95

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

92.95

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

39.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

36.87

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

0.00

0.00

0.00

0.00

0.00

0.00

0.00

362.77

NETT AREA 294.35

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Area

U

Sum

Mon

Win

Sum

Mon

Win

93

1.00

23

11

0

2138

1022

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

N

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

294

0.36

2

-1

-14

199

-58

-1469

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

1405

0.11

30

27

-14

4617

4241

-2141

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

93

1.13

13

8

-14

1380

870

-1456

Partition

363

0.32

8

3

-9

945

381

-1029

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

0

Power (W)

9000

3.40

30600

30600

15300

Lights (W)

653

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 132 of 168

2219

2219

1110

42098

39275

10315

47360

44184

10315

588

371

-621

47949

44555

9694

12.5%

08-NOV-2019

345.53

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 132 of 168

Page 49 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT UPS ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

345.53

0.12

76

85

-17

0.68

0

0

0

2151

2388

-488

ERLH

2151

2388

-488

ERTH

50100

46943

9207

Outdoor Air(S)

345.53

0.88

13

8

-14

1.08

4315

2719

-4552

Outdoor Air(Lt)

345.53

0.88

76

85

-17

0.68

15776

17513

-3577

GTH

70192

67176

1078

Refrigeration Load

70192

67176

1078

Monsoon Reheat

3394

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

899

227

71091

70796

5.92

5.90

-2206

Winter KW

-0.33

Monsoon Heaters (KW)

0.99

ESHF =(ERSH/ERTH)

0.96

0.95

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

CFM Dehum ={(ERSH)/(1.08*Deh Rise)}

2034

1890

Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-1.05

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-1.72

Final Values: Selected Load (TR)

5.92

Selected Airquantity (CFM)

2034.32

Winter Load (KW)

-0.33

Monsoon Heating (KW)

0.99

Humidifier (KW)

-1.05

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

39.36

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

288.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

270.27

NET AREA

Partition 36.87

Solar & Trans. Gain-Wall & Roof N

289

0.36

2

-1

-14

195

-57

-1440

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

270

0.32

8

3

-9

704

284

-766

08-NOV-2019

Return Air Heat Load Gain

Page 133 of 168

899

SUTHAR KETANBHAI (C360) 133 of 168

Page 50 of 82

227

-2206

-Comments provided on Rack room also applicable for this area. -- inside temp of 24 Deg C DESIGN CONDITIONS shall SEASON be considered. SUMMER OUTDOOR accordingly ETD values INDOOR shall be corretced. DIFFERENTIAL

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise)

OWNER

HPCL

PROJECT

VRMP

LOCATION

SUBSTATION 86 CT

ROOM NAME

TECH ROOM

ROOM SIZE

38.69

41.07

12.63

MONSOON

INDOOR DIFFERENTIAL

4.00

AIR CHANGES

1.50

FRESH AIR

17.00

cfm/per

WINTER

DB

WB 82.0

78.8

RH

1 Gr/LB 150.0

50.0

13.1 78.8

1542.25 Sq.ft 19475.49 Cu.ft

TECH ROOM

91.9

87.1

ROOM VOLUME

SUBSTATION 86 CT

Sheet No.

OUTDOOR

ROOM AREA OCCUPANCY

Appl. Room

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

486.89

Cfm @ AC/Hr

68.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

486.89

Cfm Selected

1-BF

0.88

Lat

205.00

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

3.94

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

5.90

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

92.95

0.00

0.00

0.00

Partition

L

0.00

0.00

24.88

0.00

38.69

0.00

0.00

0.00

10.40

H

12.63

12.63

12.63

12.63

12.63

12.63

12.63

12.63

12.63

NETT AREA

0.00

0.00

314.17

0.00

395.59

0.00

0.00

0.00

131.30

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

93

1.00

12

11

0

1115

1022

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0 0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

S

92.95

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

NE

0

0.36

8

5

-14

0

0

0

314

0.36

16

13

-14

1796

1521

-1568

E SE

0

0.36

16

13

-14

0

0

0

396

0.36

14

11

-14

1977

1631

-1974

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

1542

0.11

30

27

-14

5069

4657

-2351

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

93

1.13

13

8

-14

1380

870

-1456

Partition

131

0.32

8

3

-9

342

138

-372

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

Internal Heat Occupants (Nos.)

4

245

980

980

0

Power (W)

1000

3.40

3400

3400

1700

Lights (W)

717

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 134 of 168

2437

2437

1218

18496

16655

-4802

20808

18737

-4802

829

522

-875

21637

19260

-5677

12.5%

08-NOV-2019

486.89

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 134 of 168

Page 51 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT TECH ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

820

820

0

820

820

0

Latent Heat Occupants(Nos.)

4.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

486.89

0.12

76

85

-17

0.68

902

902

0

3031

3365

-687

ERLH

3933

4267

-687

ERTH

25571

23527

-6364

Outdoor Air(S)

486.89

0.88

13

8

-14

1.08

6080

3831

Outdoor Air(Lt)

486.89

0.88

76

85

-17

0.68

22230

24678

-5040

GTH

53881

52036

-17818

Refrigeration Load

53881

52036

-17818

Monsoon Reheat

-6414

2378

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

2658

2132

56540

56546

4.71

4.71

-2541

Winter KW

-5.97

Monsoon Heaters (KW)

0.70

ESHF =(ERSH/ERTH)

0.85

0.82

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

918

817

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-1.48

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-2.42

Final Values: Selected Load (TR)

4.71

Selected Airquantity (CFM)

918.00

Winter Load (KW)

-5.97

Monsoon Heating (KW)

0.70

Humidifier (KW)

-1.48

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

24.88

0.00

38.69

0.00

0.00

0.00

Partition

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

NET AREA

0.00

0.00

182.38

0.00

283.61

0.00

0.00

0.00

76.22

10.40

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

NE

0

0.36

8

5

-14

0

0

0

182

0.36

16

13

-14

1043

883

-910

E SE

0

0

0.36

16

13

-14

0

0

0

284

0.36

14

11

-14

1417

1169

-1415

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

76

0.32

8

3

-9

199

80

-216

S

08-NOV-2019

Return Air Heat Load Gain

Page 135 of 168

2658

SUTHAR KETANBHAI (C360) 135 of 168

Page 52 of 82

2132

-2541

-Comments provided on Rack room also applicable for this area. - inside temp of 24 Deg C shall be considered. accordingly ETD SEASON DESIGN CONDITIONS values shall be corretced. SUMMER OUTDOOR

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

HPCL

PROJECT

VRMP

LOCATION

SUBSTATION 86 CT

INDOOR

78.8

ROOM NAME

ENGINEER ROOM

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

18.93

55.89

9.84

MONSOON

ROOM AREA

1011.29 Sq.ft

INDOOR

ROOM VOLUME

9951.11

DIFFERENTIAL

OCCUPANCY

3.00

AIR CHANGES

1.50

FRESH AIR

GLASS AREA

WALL AREA

Cu.ft 17.00

cfm/per

WINTER

ENGINEER ROOM

Sheet No.

OWNER

ROOM SIZE

SUBSTATION 86 CT

DB

WB

91.9

82.0

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

248.78

Cfm @ AC/Hr

51.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

248.78

Cfm Selected

1-BF

0.88

Lat

205.00

73.7 -17

N

NE

E

SE

S

SW

W

NW

L

3.94

0.00

0.00

0.00

3.94

0.00

0.00

0.00

H

5.90

0.00

0.00

0.00

5.90

0.00

0.00

0.00

QTY

1

All Glass 92.95

2.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

AREA

46.48

0.00

0.00

0.00

46.48

0.00

0.00

0.00

Partition

L

18.93

0.00

0.00

0.00

18.93

0.00

0.00

0.00

0.00

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

0.00

0.00

0.00

139.75

0.00

0.00

0.00

0.00

NETT AREA 139.75

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Area

U

Sum

Mon

Win

Sum

Mon

Win

46

1.00

23

11

0

1069

511

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

46

1.00

12

11

0

558

511

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

N

S

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

140

0.36

2

-1

-14

95

-28

-697

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

140

0.36

14

11

-14

698

576

-697

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

1011

0.11

30

27

-14

3324

3054

-1542

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

93

1.13

13

8

-14

1380

870

-1456

Partition

0

0.32

8

3

-9

0

0

0

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

Internal Heat Occupants (Nos.)

3

245

735

735

0

Power (W)

1000

3.40

3400

3400

1700

Lights (W)

470

3.40

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 136 of 168

1598

1598

799

12856

11227

-1893

14463

12630

-1893

424

267

-447

14887

12897

-2340

12.5%

08-NOV-2019

248.78

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 136 of 168

Page 53 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT ENGINEER ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

615

615

0

615

615

0

Latent Heat Occupants(Nos.)

3.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

248.78

0.12

76

85

-17

0.68

677

677

0

1549

1719

-351

ERLH

2225

2396

-351

ERTH

17113

15293

-2691

Outdoor Air(S)

248.78

0.88

13

8

-14

1.08

3107

1958

Outdoor Air(Lt)

248.78

0.88

76

85

-17

0.68

11359

12609

-2575

GTH

31578

29860

-8544

Refrigeration Load

31578

29860

-8544

Monsoon Reheat

-3277

1990

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

787

544

32365

32394

2.70

2.70

-1385

Winter KW

-2.91

Monsoon Heaters (KW)

0.58

ESHF =(ERSH/ERTH)

0.87

0.84

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

632

547

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.76

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-1.24

Final Values: Selected Load (TR)

2.70

Selected Airquantity (CFM)

631.62

Winter Load (KW)

-2.91

Monsoon Heating (KW)

0.58

Humidifier (KW)

-0.76

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

18.93

0.00

0.00

0.00

18.93

0.00

0.00

0.00

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

138.74

0.00

0.00

0.00

138.74

0.00

0.00

0.00

0.00

NET AREA

Partition 0.00

Solar & Trans. Gain-Wall & Roof N

139

0.36

2

-1

-14

94

-27

-692

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

139

0.36

14

11

-14

693

572

-692

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

S

08-NOV-2019

Return Air Heat Load Gain

Page 137 of 168

787

SUTHAR KETANBHAI (C360) 137 of 168

Page 54 of 82

0 544

-1385

Proj Engg.

-Comments provided on Rack room also applicable for this area. Appl. Room - inside temp of 24 Deg C shall be considered. accordingly ETD values DB shall be SEASON corretced. DESIGN CONDITIONS Job no

Heat Load Calculations for Airconditioning system Location (Areawise)

OWNER

HPCL

PROJECT

VRMP

LOCATION ROOM NAME

SUMMER

OUTDOOR

91.9

SUBSTATION 86 CT

INDOOR

78.8

LOBBY 1

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

ROOM SIZE

99.29

15.81

12.46

MONSOON

ROOM AREA

1569.72 Sq.ft

INDOOR

ROOM VOLUME

19564.96 Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

1.00

17.00

cfm/per

WINTER

Rahul Lal M20/DEL-085.MI SUBSTATION 86 CT LOBBY 1

Sheet No. WB

RH

82.0

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

326.08

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

326.08

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

19.68

0.00

0.00

0.00

74.10

H

12.46

12.46

12.46

12.46

12.46

12.46

12.46

12.46

12.46

NETT AREA

0.00

0.00

0.00

0.00

245.29

0.00

0.00

0.00

923.52

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

245

0.36

14

11

-14

1226

1011

-1224

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

1570

0.11

30

27

-14

5159

4740

-2393

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

0

1.13

13

8

-14

0

0

0

Partition

924

0.32

8

3

-9

2406

969

-2618

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

729

3.40

2480

2480

1240

11271

9200

-4995

12679

10350

-4995

555

350

-586

13235

10700

-5581

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 138 of 168

12.5%

08-NOV-2019

326.08

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 138 of 168

Page 55 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT LOBBY 1 Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

326.08

0.12

76

85

-17

0.68

0

0

0

2030

2254

-460

ERLH

2030

2254

-460

ERTH

15265

12954

-6042

Outdoor Air(S)

326.08

0.88

13

8

-14

1.08

4072

2566

Outdoor Air(Lt)

326.08

0.88

76

85

-17

0.68

14888

16527

-3376

GTH

34225

32047

-13713

Refrigeration Load

34225

32047

-13713

Monsoon Reheat

-4295

2535

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

2136

1165

36361

35747

3.03

2.98

-2260

Winter KW

-4.68

Monsoon Heaters (KW)

0.74

ESHF =(ERSH/ERTH)

0.87

0.83

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

562

454

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.99

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-1.62

Final Values: Selected Load (TR)

3.03

Selected Airquantity (CFM)

561.51

Winter Load (KW)

-4.68

Monsoon Heating (KW)

0.74

Humidifier (KW)

-0.99

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

19.68

0.00

0.00

0.00

Partition

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

NET AREA

0.00

0.00

0.00

0.00

144.27

0.00

0.00

0.00

543.18

74.10

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

144

0.36

14

11

-14

721

595

-720

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

543

0.32

8

3

-9

1415

570

-1540

S

08-NOV-2019

Return Air Heat Load Gain

Page 139 of 168

2136

SUTHAR KETANBHAI (C360) 139 of 168

Page 56 of 82

1165

-2260

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise)

-Comments provided on Rack room also applicable for this area. - inside temp of 24 Deg C shall be considered.SEASON accordingly ETD DESIGN CONDITIONS OUTDOOR values shallSUMMER be corretced.

Appl. Room

HPCL

PROJECT

VRMP

LOCATION

SUBSTATION 86 CT

INDOOR

78.8

ROOM NAME

LOBBY 2

DIFFERENTIAL

13.1

OUTDOOR

87.1 78.8

19.84

48.45

9.84

MONSOON

ROOM AREA

961.35

Sq.ft

INDOOR

ROOM VOLUME

9459.73

Cu.ft

DIFFERENTIAL

OCCUPANCY

0.00

AIR CHANGES

1.00

17.00

cfm/per

WINTER

LOBBY 2

Sheet No.

OWNER

ROOM SIZE

SUBSTATION 86 CT

DB

WB

91.9

82.0

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

157.66

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

157.66

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

4.92

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

8.20

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

1.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

40.34

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

19.84

0.00

0.00

0.00

19.84

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

NETT AREA

0.00

0.00

0.00

0.00

154.92

0.00

0.00

0.00

195.26

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

40

1.00

12

11

0

484

444

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

S

40.34

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

155

0.36

14

11

-14

774

639

-773

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

961

0.11

30

27

-14

3160

2903

-1466

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

40

1.13

13

8

-14

599

377

-632

Partition

195

0.32

8

3

-9

509

205

-554

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

447

3.40

1519

1519

759

7045

6086

-2665

7925

6847

-2665

268

169

-283

8194

7016

-2948

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 140 of 168

12.5%

08-NOV-2019

157.66

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 140 of 168

Page 57 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT LOBBY 2 Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH

0

0

0

982

1090

-223

ERLH

982

1090

-223

ERTH

9175

8106

-3170

Outdoor Air

157.66

0.12

76

85

-17

0.68

Outdoor Air(S)

157.66

0.88

13

8

-14

1.08

1969

1241

Outdoor Air(Lt)

157.66

0.88

76

85

-17

0.68

7199

7991

-1632

GTH

18343

17338

-6879

Refrigeration Load

18343

17338

-6879

Monsoon Reheat

-2077

1177

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

1106

752

19448

19267

1.62

1.61

-1138

Winter KW

-2.35

Monsoon Heaters (KW)

0.35

ESHF =(ERSH/ERTH)

0.89

0.87

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

348

298

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.48

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-0.78

Final Values: Selected Load (TR)

1.62

Selected Airquantity (CFM)

347.63

Winter Load (KW)

-2.35

Monsoon Heating (KW)

0.35

Humidifier (KW)

-0.48

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

19.84

0.00

0.00

0.00

Partition

H

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

7.33

NET AREA

0.00

0.00

0.00

0.00

145.47

0.00

0.00

0.00

145.47

19.84

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

145

0.36

14

11

-14

727

600

-726

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

145

0.32

8

3

-9

379

153

-412

S

08-NOV-2019

Return Air Heat Load Gain

Page 141 of 168

1106

SUTHAR KETANBHAI (C360) 141 of 168

Page 58 of 82

752

-1138

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

OWNER

HPCL

PROJECT

VRMP

LOCATION

SUBSTATION 86 CT

ROOM NAME

AHU ROOM SF

ROOM SIZE

39.41

-Comments provided on Rack room also applicable for this area. - inside temp of 24 Deg C shall be SEASON DESIGN CONDITIONS SUMMER accordingly OUTDOOR considered. ETD INDOOR values shall be corretced.

41.07

19.96

MONSOON

78.8

INDOOR DIFFERENTIAL

AIR CHANGES

0.00

17.00

cfm/per

WINTER

78.8 87.1

1571.88 Sq.ft 0.00

WB 82.0

OUTDOOR

31372.82 Cu.ft

OCCUPANCY

DB 91.9 13.1

ROOM VOLUME

AHU ROOM SF

Sheet No.

DIFFERENTIAL

ROOM AREA

SUBSTATION 86 CT

RH

Gr/LB 150.0

50.0

73.7 76.3

82.0

8.3

0.0

OUTDOOR

64.9

57.0

INDOOR

78.8

DIFFERENTIAL

-14

158.4 50.0

73.7

0.0

84.7 56.4

50.0

0.00

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.12 Occupant Heat

Sens

245.00

0.00

Cfm Selected

1-BF

0.88

Lat

205.00

FRESH AIR

1

73.7 -17

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

3.94

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

5.90

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

4.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

92.95

0.00

0.00

0.00

L

0.00

0.00

0.00

0.00

39.41

0.00

41.07

0.00

0.00

H

19.96

19.96

19.96

19.96

19.96

19.96

19.96

19.96

19.96

NETT AREA

0.00

0.00

0.00

0.00

693.61

0.00

819.62

0.00

0.00

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

93

1.00

12

11

0

1115

1022

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

S

92.95

Partition

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

694

0.36

14

11

-14

3466

2859

-3461

S SW

0

0.36

12

9

-14

0

0

0

820

0.36

10

7

-14

2915

2198

-4090

0

0.36

4

1

-14

0

0

0

1572

0.11

30

27

-14

5166

4746

-2396

W NW Roof Sun

Trans. Gain-Except Wall & Roof All Glass

93

1.13

13

8

-14

1380

870

-1456

Partition

0

0.32

8

3

-9

0

0

0

Ceiling

0

0.29

8

3

-9

0

0

0

Floor

0

0.36

8

3

-9

0

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

730

3.40

2483

2483

1242

16527

14179

-10161

18592

15952

-10161

0

0

0

18592

15952

-10161

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 142 of 168

12.5%

08-NOV-2019

0.00

0.12

13

8

-14

1.08

SUTHAR KETANBHAI (C360) 142 of 168

Page 59 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

SUBSTATION 86 CT AHU ROOM SF Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

0

0

0

0

0

0

ERLH

0

0

0

ERTH

18592

15952

-10161

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

0.00

0.12

76

85

-17

0.68

Outdoor Air(S)

0.00

0.88

13

8

-14

1.08

0

0

Outdoor Air(Lt)

0.00

0.88

76

85

-17

0.68

0

0

0

GTH

18592

15952

-10161

Refrigeration Load

18592

15952

-10161

Monsoon Reheat

0

2641

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

0

0

18592

18592

1.55

1.55

0

Winter KW

0.00

Monsoon Heaters (KW)

0.00

ESHF =(ERSH/ERTH)

1.00

1.00

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

21.82

21.82

0

0

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

0.00

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

0.00

Final Values: Selected Load (TR)

1.55

Selected Airquantity (CFM)

0.00

Winter Load (KW)

0.00

Monsoon Heating (KW)

0.00

Humidifier (KW)

0.00

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

39.41

0.00

41.07

0.00

Partition

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Solar & Trans. Gain-Wall & Roof N

0

0.36

2

-1

-14

0

0

0

NE

0

0.36

8

5

-14

0

0

0

E

0

0.36

16

13

-14

0

0

0

SE

0

0.36

16

13

-14

0

0

0

S

0

0.36

14

11

-14

0

0

0

SW

0

0.36

12

9

-14

0

0

0

W

0

0.36

10

7

-14

0

0

0

NW

0

0.36

4

1

-14

0

0

0

Roof Sun

0

0.11

30

27

-14

0

0

0

Partition

0

0.32

8

3

-9

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 143 of 168

0

SUTHAR KETANBHAI (C360) 143 of 168

Page 60 of 82

0 0

0

Page 144 of 168

HEAT LOAD ESTIMATION FOR VRMP

4.2.1 SUMMARY SHEET FOR NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 144 of 168

Page 61 of 82

Page 145 of 168

PROJECT : VIZAG REFINERY MODERNIZATION PROJECT OWNER : HINDUSTAN PETROLEUM CORPORATION LIMITED

CONSULTANT: ENGINEERS INDIA LIMITED

SUMMARY SHEET FOR NHT CCR FIELD ROOM BUILDING

Date: 03.10.2019

B18

1.0 1.0 0.0

102.00 102.00 0.00 204.00

08-NOV-2019 SUTHAR KETANBHAI (C360) 145 of 168

Page 62 of 82

I110

I111

-1.34 -1.06 -0.74 -3.15

0.43 0.27 0.35 1.05

-0.16 -0.16 0.00 -0.32

I108

I107

I109

826 326 302 1454.30

2.22 1.32 0.48 4.03

Humidifier ( Kw)

B15

50.0 50.0 50.0

Monsoon Heating ( KW )

J9

75.2 75.2 75.2

Winter Load ( KW)

H9

6.0 6.0 0.0 12.00

Unit Ref. Load

B58

Dehumidified Unit CFM

Fresh air ACPH

B59 1000 0 0 1000.00

fresh air CFM

Room Design RH in %age

D11 9.84 9.84 14.60

Room Design Temp. in deg. F

B12 621.83 264.15 164.60 1050.58

Height ( Ft )

C11 27.80 18.86 11.81

Floor Area(sqft)

B11 22.37 14.01 13.94

Width(Ft)

Occup. (Persons)

1 2 3

Length(Ft)

B10 SHIFT INCHARGE ROOM DINING ROOM PACKAGE AC ROOM TOTAL

S.no

Eqip. Load(W)

Area Description

Rev. 00

Page 146 of 168

HEAT LOAD ESTIMATION FOR VRMP

4.2.2 CALCULATION SHEET FOR NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 146 of 168

Page 63 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM SHIFT INCHARGE ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

NHT CCR FIELD ROOM

INDOOR

75.2

SHIFT INCHARGE ROOM

DIFFERENTIAL

16.7

OUTDOOR

87.1

ROOM SIZE

22.37

27.80

9.84

MONSOON

DESIGN CONDITIONS

ROOM AREA

621.83

Sq.ft

INDOOR

75.2

ROOM VOLUME

6118.81

Cu.ft

DIFFERENTIAL

11.9

OUTDOOR

64.9

INDOOR

75.2

DIFFERENTIAL

-10

OCCUPANCY

6.00

AIR CHANGES

1.00

FRESH AIR

17.00

cfm/per

WINTER

RH

1 Gr/LB 150.0

50.0

65.3 84.7

82.0

158.4 50.0

65.3 93.1

57.0

56.4 50.0

101.98

Cfm @ AC/Hr

102.00

Cfm @ Occup

BF

0.17 Occupant Heat

Sens

245.00

102.00

Cfm Selected

1-BF

0.83

Lat

205.00

65.3 -9

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

0.00

0.00

27.80

0.00

22.37

0.00

0.00

0.00

30.57

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

NETT AREA

0.00

0.00

273.53

0.00

220.12

0.00

0.00

0.00

300.80

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

0

0

0

0

0

0

2558

2239

-1347

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

NE

0

0.48

11

9

-10

274

0.48

19

17

-10

E SE

0

0.48

19

17

-10

220

0.48

17

15

-10

SW

0

0.48

15

13

-10

W

0

0.48

13

11

-10

NW

0

0.48

7

5

-10

622

0.11

33

31

-10

S

Roof Sun

0.00

ETD values shall be considered for Blast proof construction. Pl check and correct.

0

0

0

1847

1590

-1084

0

0

0

0

0

0

0

0

0

2290

2124

-702

Trans. Gain-Except Wall & Roof All Glass

0

1.13

17

12

-10

0

0

0

Partition

301

0.32

12

7

-5

1130

662

-506

Ceiling

0

0.29

12

7

-5

0

0

0

Floor

0

0.36

12

7

-5

0

0

0

6

245

1470

1470

0

Power (W)

1000

3.40

3400

3400

1700

Lights (W)

289

3.40

Internal Heat Occupants (Nos.)

ETD for heat gain from ceiling/ roof to be considered. heat gain from roof sun to be considered,

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 147 of 168

982

982

491

13677

12467

-1448

15387

14026

-1448

313

222

-192

15700

14248

-1640

12.5%

08-NOV-2019

102.00

0.17

17

12

-10

1.08

SUTHAR KETANBHAI (C360) 147 of 168

Page 64 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM SHIFT INCHARGE ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

1230

1230

0

1230

1230

0

1353

1353

0

999

1098

-105

Latent Heat Occupants(Nos.)

6.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

102.00

0.17

85

93

-9

0.68

ERLH

2352

2451

-105

ERTH

18052

16699

-1745

Outdoor Air(S)

102.00

0.83

17

12

-10

1.08

1531

1086

Outdoor Air(Lt)

102.00

0.83

85

93

-9

0.68

4876

5360

-512

GTH

24459

23145

-3196

Refrigeration Load

24459

23145

-3196

Monsoon Reheat

-938

1452

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

1983

2096

26441

26693

2.20

2.22

-1371

Winter KW

-1.34

Monsoon Heaters (KW)

0.43

ESHF =(ERSH/ERTH)

0.87

0.85

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

17.60

17.60

826

750

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.16

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-0.26

Final Values: Selected Load (TR)

2.22

Selected Airquantity (CFM)

826.17

Winter Load (KW)

-1.34

Monsoon Heating (KW)

0.43

Humidifier (KW)

-0.16

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

27.80

0.00

22.37

0.00

0.00

0.00

Partition

H

4.59

4.59

4.59

4.59

4.59

4.59

4.59

4.59

4.59

NET AREA

0.00

0.00

127.65

0.00

102.72

0.00

0.00

0.00

140.38

30.57

Solar & Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

NE

0

0.48

11

9

-10

0

0

0

128

0.48

19

17

-10

1194

1045

-629

E SE

0

0

0.48

19

17

-10

0

0

0

103

0.48

17

15

-10

862

742

-506

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

Roof Sun

0

0.11

33

31

-10

0

0

0

Partition

140

0.32

12

7

-5

527

309

-236

S

08-NOV-2019

heat gain from roof sun not considerd. pl check and correct.

Return Air Heat Load Gain

Page 148 of 168

2583

SUTHAR KETANBHAI (C360) 148 of 168

Page 65 of 82

2096

-1371

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

OWNER

HPCL

PROJECT

VRMP

LOCATION ROOM NAME

comments given on shift in charge room applicable to dining room too.

DINING ROOM

Sheet No. DB

WB

OUTDOOR

91.9

82.0

NHT CCR FIELD ROOM

INDOOR

75.2

DINING ROOM

DIFFERENTIAL

16.7

OUTDOOR

87.1

ROOM SIZE

SEASON

NHT CCR FIELD ROOM

SUMMER

14.01

18.86

9.84

MONSOON

DESIGN CONDITIONS

ROOM AREA

264.15

Sq.ft

INDOOR

75.2

ROOM VOLUME

2599.19

Cu.ft

DIFFERENTIAL

11.9

OUTDOOR

64.9

INDOOR

75.2

DIFFERENTIAL

-10

OCCUPANCY

6.00

AIR CHANGES

1.00

FRESH AIR

17.00

cfm/per

WINTER

RH

1 Gr/LB 150.0

50.0

65.3 84.7

82.0

158.4 50.0

65.3 93.1

57.0

56.4 50.0

43.32

Cfm @ AC/Hr

102.00

Cfm @ Occup

BF

0.17 Occupant Heat

Sens

245.00

102.00

Cfm Selected

1-BF

0.83

Lat

205.00

65.3 -9

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

14.01

0.00

0.00

0.00

32.87

H

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

9.84

NETT AREA

0.00

0.00

0.00

0.00

137.82

0.00

0.00

0.00

323.40

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

0

NE

0

0.48

11

9

-10

0

0

0

E

0

0.48

19

17

-10

0

0

0

SE

0

0.48

19

17

-10

0

0

0

138

0.48

17

15

-10

1156

996

-679

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

264

0.11

33

31

-10

973

902

-298

S

Roof Sun

Trans. Gain-Except Wall & Roof All Glass

0

1.13

17

12

-10

0

0

0

Partition

323

0.32

12

7

-5

1215

712

-544

Ceiling

0

0.29

12

7

-5

0

0

0

Floor

0

0.36

12

7

-5

0

0

0

0

Internal Heat Occupants (Nos.)

6

245

1470

1470

Power (W)

0

3.40

0

0

0

Lights (W)

123

3.40

417

417

209

5231

4497

-1313

5885

5059

-1313

313

222

-192

6199

5282

-1505

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 149 of 168

12.5%

08-NOV-2019

102.00

0.17

17

12

-10

1.08

SUTHAR KETANBHAI (C360) 149 of 168

Page 66 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM DINING ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

1230

1230

0

1230

1230

0

1353

1353

0

999

1098

-105

ERLH

2352

2451

-105

ERTH

8551

7732

-1610

Latent Heat Occupants(Nos.)

6.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

102.00

0.17

85

93

-9

0.68

Outdoor Air(S)

102.00

0.83

17

12

-10

1.08

1531

1086

Outdoor Air(Lt)

102.00

0.83

85

93

-9

0.68

4876

5360

-512

GTH

14957

14178

-3060

Refrigeration Load

14957

14178

-3060

Monsoon Reheat

-938

917

Return Air Heat Load Grand Total Refrigeration Load

BTU/HR

Grand Total Refrigeration Load

TR

707

797

15664

15892

1.31

1.32

-571

Winter KW

-1.06

Monsoon Heaters (KW)

0.27

ESHF =(ERSH/ERTH)

0.72

0.68

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

17.60

17.60

326

278

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

-0.16

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

-0.26

Final Values: Selected Load (TR)

1.32

Selected Airquantity (CFM)

326.19

Winter Load (KW)

-1.06

Monsoon Heating (KW)

0.27

Humidifier (KW)

-0.16

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

14.01

0.00

0.00

0.00

Partition

H

4.59

4.59

4.59

4.59

4.59

4.59

4.59

4.59

4.59

NET AREA

0.00

0.00

0.00

0.00

64.31

0.00

0.00

0.00

150.92

32.87

Solar & Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

0

NE

0

0.48

11

9

-10

0

0

0

E

0

0.48

19

17

-10

0

0

0

SE

0

0.48

19

17

-10

0

0

0

64

0.48

17

15

-10

540

465

-317

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

Roof Sun

0

0.11

33

31

-10

0

0

0

Partition

151

0.32

12

7

-5

567

332

-254

S

08-NOV-2019

Return Air Heat Load Gain

Page 150 of 168

1107

SUTHAR KETANBHAI (C360) 150 of 168

Page 67 of 82

797

-571

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM PACKAGE AC ROOM

Sheet No. OWNER

HPCL

SEASON

PROJECT

VRMP

SUMMER

LOCATION ROOM NAME

DB

WB

OUTDOOR

91.9

82.0

NHT CCR FIELD ROOM

INDOOR

75.2

PACKAGE AC ROOM

DIFFERENTIAL

16.7

OUTDOOR

87.1

ROOM SIZE

13.94

11.81

14.60

MONSOON

DESIGN CONDITIONS

ROOM AREA

164.60

Sq.ft

INDOOR

75.2

ROOM VOLUME

2402.55

Cu.ft

DIFFERENTIAL

11.9

OUTDOOR

64.9

INDOOR

75.2

DIFFERENTIAL

-10

OCCUPANCY

0.00

AIR CHANGES

0.00

17.00

cfm/per

WINTER

RH

Gr/LB 150.0

50.0

65.3 84.7

82.0

158.4 50.0

65.3 93.1

57.0

56.4 50.0

0.00

Cfm @ AC/Hr

0.00

Cfm @ Occup

BF

0.17 Occupant Heat

Sens

245.00

0.00

Cfm Selected

1-BF

0.83

Lat

205.00

FRESH AIR

1

65.3 -9

All Glass

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

QTY

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Partition

L

0.00

0.00

0.00

0.00

13.94

0.00

11.81

0.00

25.75

H

14.60

14.60

14.60

14.60

14.60

14.60

14.60

14.60

14.60

NETT AREA

0.00

0.00

0.00

0.00

203.47

0.00

172.35

0.00

375.82

Area

U

Sum

Mon

Win

Sum

Mon

Win

N

0

1.00

23

11

0

0

0

0

NE

0

1.00

12

11

0

0

0

0

E

0

1.00

12

11

0

0

0

0

SE

0

1.00

12

11

0

0

0

0

S

0

1.00

12

11

0

0

0

0

SW

0

1.00

85

113

0

0

0

0

W

0

1.00

163

165

0

0

0

0

NW

0

1.00

138

118

0

0

0

0

GLASS AREA

WALL AREA

Solar Gain - Glass

B.Th.U/Hr/Sq.ft.

0.00

Btu/Hr

Temperature Difference

Solar&Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

0

NE

0

0.48

11

9

-10

0

0

0

E

0

0.48

19

17

-10

0

0

0

SE

0

0.48

19

17

-10

0

0

0

203

0.48

17

15

-10

1707

1470

-1002

S SW W NW Roof Sun

0

0.48

15

13

-10

0

0

0

172

0.48

13

11

-10

1115

914

-849

0

0.48

7

5

-10

0

0

0

165

0.11

33

31

-10

606

562

-186

Trans. Gain-Except Wall & Roof All Glass

0

1.13

17

12

-10

0

0

0

Partition

376

0.32

12

7

-5

1412

827

-633

Ceiling

0

0.29

12

7

-5

0

0

0

Floor

0

0.36

12

7

-5

0

0

0

0

Internal Heat Occupants (Nos.)

0

245

0

0

Power (W)

0

3.40

0

0

0

Lights (W)

76

3.40

260

260

130

5100

4034

-2539

5738

4538

-2539

0

0

0

5738

4538

-2539

1.00

Sub Total Safety Factor RSH Outdoor Air ERSH

Page 151 of 168

12.5%

08-NOV-2019

0.00

0.17

17

12

-10

1.08

SUTHAR KETANBHAI (C360) 151 of 168

Page 68 of 82

Proj Engg.

Rahul Lal

Job no

M20/DEL-085.MI

Heat Load Calculations for Airconditioning system Location (Areawise) Appl. Room

NHT CCR FIELD ROOM PACKAGE AC ROOM Sheet No.

Temperature Difference Summer

Monsoon

2

Btu/Hr

Winter

Sum

Mon

Win

0

0

0

0

0

0

0

0

0

0

0

0

ERLH

0

0

0

ERTH

5738

4538

-2539

Latent Heat Occupants(Nos.)

0.00

205.00

0.00 Winter

Sub Total Safety factor

10.0%

RLH Outdoor Air

0.00

0.17

85

93

-9

0.68

Outdoor Air(S)

0.00

0.83

17

12

-10

1.08

0

0

Outdoor Air(Lt)

0.00

0.83

85

93

-9

0.68

0

0

0

GTH

5738

4538

-2539

Refrigeration Load

5738

4538

-2539

Monsoon Reheat

0

1200

Return Air Heat Load

-400

0

Grand Total Refrigeration Load

BTU/HR

5338

5738

Grand Total Refrigeration Load

TR

0.44

0.48

0

Winter KW

-0.74

Monsoon Heaters (KW)

0.35

ESHF =(ERSH/ERTH)

1.00

1.00

ADP (Calculated)

55.00

54.90

ADP (Selected)

54.00

54.00

Deh Rise={(Tr-Tadp)*(1-BF)}

17.60

17.60

302

239

CFM Dehum ={(ERSH)/(1.08*Deh Rise)} Humidifier KW

= {(Moisture addition to FA in Kg/Hr* Latent heat of steam(540))/880}

0.00

Moisture addition (Kg/Hr) =[(FA* Gr Diff(Out-Wint))/(1580*2.2046)]

0.00

Final Values: Selected Load (TR)

0.48

Selected Airquantity (CFM)

301.94

Winter Load (KW)

-0.74

Monsoon Heating (KW)

0.35

Humidifier (KW)

0.00

RETURN AIR HEAT LOAD

WALL AREA

N

NE

E

SE

S

SW

W

NW

L

0.00

0.00

0.00

0.00

13.94

0.00

11.81

0.00

Partition

H

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

NET AREA

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.75

Solar & Trans. Gain-Wall & Roof N

0

0.48

5

3

-10

0

0

0

NE

0

0.48

11

9

-10

0

0

0

E

0

0.48

19

17

-10

0

0

0

SE

0

0.48

19

17

-10

0

0

0

S

0

0.48

17

15

-10

0

0

0

SW

0

0.48

15

13

-10

0

0

0

W

0

0.48

13

11

-10

0

0

0

NW

0

0.48

7

5

-10

0

0

0

Roof Sun

0

0.11

33

31

-10

0

0

0

Partition

0

0.32

12

7

-5

0

0

08-NOV-2019

Return Air Heat Load Gain

Page 152 of 168

0

SUTHAR KETANBHAI (C360) 152 of 168

Page 69 of 82

0 0

0

Page 153 of 168

HEAT LOAD ESTIMATION FOR VRMP

SECTION-5 EQUIPMENT SELECTION

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 153 of 168

Page 70 of 82

HEAT LOAD ESTIMATION FOR VRMP

5.1. SELECTION

BUILDING/ FLOOR

AIR CONDITIONING SYSTEM TYPE

Minimum capacity indicated as per tender shall be ensured.

VAM

SYSTEM QUANTITY/ CAPACITY Total Load = 124.62 TR x 65 % each i.e. 81 TR each 2 Nos. of 83 TR VAM (Actual Capacity) 1 No. x 22850 CFM for First Floor

AIR HANDLING UNIT 1 No. x 13550 CFM for Second Floor 1 No. x 21 KW for First Floor

SUBSTATION BUILDING- 86 CT

Page 154 of 168

HEATER 1 No. x 10.5 KW for Second Floor 1 No. x 21 KW for First Floor HUMIDIFIER 1 No. x 9 KW for Second Floor 2 Nos. x 3160 CFM for First Floor CHEMICAL FILTER UNIT 1 No. x 2650 CFM for Second Floor

NHT CCR BUILDING

Water Cooled Package AC

2 Nos.(1W+1S) x 5.5 TR Water Cooled PAC Nominal capacity Dehumidified CFM- 2200 CFM each

-Also indicate Actual capacity of machine. -Capacity of Chemical filter, Heater and humidifier shall be indicated . -Ensure to include 10% margin over calculated capacity for heater and humidifier.

1.Add following note Suitably:(equipment sizing): Air conditioning machine capacity indicated is Actual capacity based on heat load calculation. Equivalent nominal capacity, capacity deration chart (duly furnished by OEM), catalogues etc shall be included in respective equipment datasheet. 2. Capacity margin for Heater and humidifier shall be ensured as per EIL std spec 6-61-0017. VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 154 of 168

Page 71 of 82

HEAT LOAD ESTIMATION FOR VRMP

SECTION-6 ARCHITECTURE DRAWINGS The Arch dwg of substation (CT ) is as per current revision. However, the current revision of Field Room for NHT CCR is attached. Although there is no change in the area under Air conditioning wrt Rev 0, it is advisable that contractor shall use the latest arch drawing for further engineering.

Page 155 of 168

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 155 of 168

Page 72 of 82

Page 156 of 168

HEAT LOAD ESTIMATION FOR VRMP

6.1 LIST OF DRAWINGS: Sl No.

Drawing Title

Drawing Number

A.

Substation- 86 (CT)

1

Ground & First Floor Plan

B015-000-8141-02421, Rev.3

2

Second Floor Plan, Elevations & Sections

B015-000-8141-02422, Rev.2

3

Terrace Plan & Elevations

B015-000-8141-02423, Rev.1

4

Elevations & Sections

B015-000-8141-02424, Rev.2

5

Profile of Doors/Windows

B015-000-8141-02425, Rev.2

B.

Field Room-NHT CCR Plans, Elevations & Sections Terrace Plan, Elevations, Sections & Profile of Doors

B015-000-8141-12821, Rev.0 B015-000-8141-12822, Rev.0

latest revision of drgs for NHT CCR attached. Pl check caln accordingly and use latest revision.

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 156 of 168

Page 73 of 82

Page 157 of 168

HEAT LOAD ESTIMATION FOR VRMP

SUBSTATION BUILDING- 86 CT

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 157 of 168

Page 74 of 82

3

4

5

6

7

8

9

10

11

12

N

14

15

B015-000-81-41-02422 B015-000-81-41-02423 B015-000-81-41-02424 B015-000-81-41-02425

16

REFERENCE DRAWING TITLE SECOND FLOOR PLAN & SECTION TERRACE PLAN, ELEVATION & SECTION ELEVATIONS & SECTIONS DOORS & WINDOWS PROFILE

A

1 NOTES :-

FLOOR TRAP

V1A

V1A

V1A

V1A

REFER NOTE 16 & 17 900 900

RS1

B

AHU ROOM

POWER TRANSFORMER BELOW

HEAVY DUTY FLOORING

GYPSUM BOARD PARTITION UPTO FALSE CEILING

OPERATOR ROOM

1050

AC FC

LOADING/ UNLOADING PLATFORM

MONORAIL 1500

7500

33000

UP SD1A AL1

W2

V1

WALL TO BE CONSTRUCTED AFTER INSTALLATION OF EQUIPMENT

V1

RS1

AIR LOCK LOBBY

FC

AL2

1200

FC AC

1200

VITRIFIED TILE FLOORING

E

UP

UP STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

V1 5500mm HIGH WALL (TYP)

50 DIA G.I. SPOUT (TYP.)

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER BELOW

DN

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER BELOW

UP

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER BELOW

SD1

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER BELOW

DISTRIBUTION TRANSFORMER BELOW

SINK

W1

W1

W1

3500

6000

6000

1

6000

-

3300

STD. STEEL ROLLING SHUTTER, ELECTRICALLY OPERATED

RS2

3000x3000

-

3000

STD. STEEL ROLLING SHUTTER, PARTLY GRILL TYPE, ELECTRICALLY OPERATED

3

D1

1100x2100

0880x2090

2100

35 THK FULLY PANELLED DOOR SOMGLE SHUTTER AS PER EIL STD. 7-75-0066

3

D2

0900x2100

0880x2090

2100 PVC DOOR AS PER SPECIFICATIONS

04

AL1

1500x2500

1480x2490

POWDER COATED ALMN. GLAZED DOOR WITH 2500 6mm THK TOUGHENED GLASS, DOUBLE LEAF AS/EIL STD NO. 7-75-0014.

06

AL2

1000x2100

0980x2090

2100 SAME AS AL1A BUT SINGLE SHUTTER

06

W1

6000

550

6000 66550

6000

50 DIA G.I. SPOUT (TYP.)

2 EXHAUST FANS OF 450MM DIA

6000

6000

6000

6000

3500

F

3000x3300

W1

3

6000

W1

NOS.

RS1

EPOXY PAINT ON FLOOR WITH 2500 MM HIGH EPOXY PAINT ON DADO/WALL

DISTRIBUTION TRANSFORMER BELOW

G

160 Ø R.W.P. (TYP)

LINTEL TYPE OPENING SIZE FRAME SIZE LEVEL

1000 HIGH S.S. RAILING

BATTERY ROOM

1500

6000

DISTRIBUTION TRANSFORMER BELOW

5500mm HIGH WALL (TYP)

SCHEDULE OF DOORS & WINDOWS

1500

V1 1000 HIGH S.S. RAILING

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, SD1 1000 HIGH

1500

7500

FIRE HYDRANT

750

DN

DN

E

D

AIR LOCK LOBBY

AL2

HEAVY DUTY FLOORING

AL2

F

HEAVY DUTY FLOORING

2

SWITCHGEAR HALL

2500

15000

FC

MONORAIL 1500

AL2

AL2

VITRIFIED TILE FLOORING

REMOVEABLE TYPE 1000 HIGH S.S. RAILING

LOADING/ UNLOADING PLATFORM

PROTECTIVE STEEL PLATE COVER OVER EXP JOINT (TYP)

AL2

750

C

LIF T

2

FIRE HYDRANT

7500mm HIGH WALL (TYP)

RS1

HEAVY DUTY FLOORING

D

7500mm HIGH WALL (TYP)

R-150 T-300 W-1500 STEPS

VITRIFIED TILE FLOORING

2300

6000

HEAVY DUTY FLOORING

REMOVEABLE TYPE 1000 HIGH S.S. RAILING

1050

LOADING/ UNLOADING PLATFORM

POWER TRANSFORMER BELOW

CAPACITOR BANK BELOW

CAPACITOR BANK BELOW

2500

2 NOS. MONORAILS TO BE PROVIDED

6000

V1

GIS PANELS

3350

1500

V1

V1

V1

C

03 01

02

ELBUOD , ROOD DEZALG , DETAR ER I F RH - 2 1500x2500 1480x2490 2500 . NO I TAC I F FD1 I CEPS S ' RERUTCAFUNAM REP SA RETTUHS

G

05

73550

FD2

RETTUHS ELGN I S , 1DF SA EMAS 1000x2100 0980x2090 2100

SD1

1500x2500

1480x2490

2500

SD1A

1500x2500

1480x2490

2500 SAME AS SD1 BUT AIR-TIGHT

SD2

1000x2100

980x2090

2100

W1

1200x1800

1180x1790

ALMN. GLAZED WINDOW POWDER COATED WITH 3500 6 mm THKTOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

W2

3500x1800

3480x1790

V1

2600x 600

BEAM ALMN. GLAZED VENTILATOR POWDER COATED 2580x 590 BOTTOM WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

V1A

2600x 600

3

V2

1500x 600

3

V3

4000x 600

BEAM ALMN. GLAZED VENTILATOR POWDER COATED 3980x 590 BOTTOM WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

03

V4

2600x 600

2580x 590

ALMN. GLAZED VENTILATOR POWDER COATED 3500 WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

04

FIRST FLOOR PLAN

SLOPE 1:6 RAMP UP

1000 WIDE PLINTH PROTECTION ALL AROUND THE BUILDING

I

1485

EQ. 115 D2

EQ. D2

O

1340

TOILET

D/W

V1

V1

V1

V1

SLOPE 1:6 RAMP UP

RS2

PE

A C PLANT ROOM

D1

HEAVY DUTY FLOORING (CLEAR HEIGHT 3500mm - BEAM BOTTOM)

100.300

3

POWER TRANSFORMER

12000

F.F.L

LOADING/ UNLOADING PLATFORM

6000

TRANSFORMER GATE AS/ EIL STANDARD NO. 7-75-0052 (TYPICAL)

3 V1

V1 J

SLOPE 1:6 RAMP UP

FC

900

6000

600 WIDE R.C.C. SUNSHADE ABOVE

FLOOR TRAP

SL

SLOPE 1:6 RAMP UP

WALL TO BE CONSTRUCTED AFTER INSTALLATION OF EQUIPMENT

V1

V2

1

3

HEAVY DUTY FLOORING

100.150

100.150

EXHAUST FANS OF 450MM DIA (TYP)

100.150

TOP OF GRAVEL

TOP OF GRAVEL

02

PRESSED STEEL DOOR WITH PRESSED STEEL 08 FRAME, DOUBLE SHUTTER AS/EIL.STD. 7-75-0071 02

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, SINGLE SHUTTER AS/EIL.STD. 7-75-0070

46

ALMN. GLAZED WINDOW POWDER COATED WITH 2500 6 mm THK TOUGHENED GLASS, FIXED TYPE.

BEAM ALMN. GLAZED VENTILATOR POWDER COATED 2580x 590 BOTTOM WITH 6 mm THK TOUGHENED GLASS, FIXED TYPE. ALMN. GLAZED VENTILATOR POWDER COATED 1480x 590 3000 WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

H

05

01

24

I

04

02

J

LEGEND:

100.150

TOP OF GRAVEL

7500mm HIGH WALL (TYP)

V3

POWER TRANSFORMER

CAPACITOR BANK

CAPACITOR BANK

F.R.L. F.F.L.

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL AC = AIR CONDITIONED FC = FALSE CEILING AC UD UD = UNDERDECK INSULATION

TOP OF GRAVEL

7500mm HIGH WALL (TYP)

FC

V1

LIF T

V1

2300

H

K

K

KEY PLAN (Not To Scale) T-300 R-150

T-300 R-150

V1

PE

PE

FLOOR TRAP

345 THK BRICK WALL (TYP)

5500mm HIGH WALL (TYP)

6000

DISTRIBUTION TRANSFORMER 100.150 TOP OF GRAVEL

O SL

345 THK BRICK WALL (TYP) FLOOR TRAP

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER 100.150 TOP OF GRAVEL

345 THK BRICK WALL (TYP)

345 THK BRICK WALL (TYP)

5500mm HIGH WALL (TYP)

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

SD1

TOP OF GRAVEL

TOP OF GRAVEL

TOP OF GRAVEL

1500

6000

FLOOR TRAP

DISTRIBUTION TRANSFORMER 100.150

106.88

1200

100.300

F.F.L

F.F.L SD2

R-150 T-300

550

6000

3 2 1 0 D C B A

RAIN WATER PIPE UNDER FLOOR FOR WATER DISPOSAL (TYPICAL)

100.300

TOP OF GRAVEL

1000 HIGH S.S. RAILING

CEMENT CONCRETE FLOORING

CEMENT CONCRETE FLOORING

V1

3

PE

STORE ROOM

MAINTENANCE ROOM

V1

RAMP UP SLOPE 1:6

6000

M

O

1500

600 6000

DISTRIBUTION TRANSFORMER 100.150

RESIDUE UPGRADATION FACILITY (RUF)

V1

SD2

900

6000

SL

FLOOR TRAP

AL1

RAMP UP SLOPE 1:6

TRANSFORMER GATE AS/ EIL STANDARD NO. 7-75-0051 (TYPICAL)

6000

345 THK BRICK WALL (TYP)

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER 100.150

TOP OF GRAVEL

160 Ø R.W.P. (TYP)

3500

5500mm HIGH WALL (TYP)

100.300 F.F.L

2 1

O

UP

VITRIFIED TILE FLOORING

DISTRIBUTION TRANSFORMER 100.150

RAIN WATER PIPE UNDER FLOOR FOR WATER DISPOSAL (TYPICAL)

345 THK BRICK WALL (TYP)

FLOOR TRAP

LOBBY

5500mm HIGH WALL (TYP)

DISTRIBUTION TRANSFORMER 100.150

PE

345 THK BRICK WALL (TYP)

FIRE HYDRANT

750

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

SL O

PE O

SL

125 (TYP) 1500 (TYP)

07.05.18 13.03.18 08.11.17 02.11.17 11.08.17 21.06.17 16.06.17 08.06.17

REVISED AS MARKED 3 & REISSUED FOR CONSTRUCTION REVISED AS MARKED 2 & REISSUED FOR CONSTRUCTION REVISED AS MARKED & RE-ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION ISSUED FOR DET. ENGG. REISSUED FOR TENDER ISSUED FOR TENDER ISSUED FOR COMMENTS

REV. DATE T-300 R-150 STEP UP

RAMP UP SLOPE 1:6

1

6000

L

REVISIONS

SM SM SM SM SM SG SG SG

GJK GJK GJK GJK GJK GJK GJK GJK

BY

JS JS JS JS JS JS JS JS

N

V1

O SL

S/S 86 & SRR (FOR CT)

CWTP

RAMP UP

1500

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

1000 HIGH S.S. RAILING

N

1500

1500 (TYP) UP

SUMP BCW PH

SLOPE 1:6

SD1

125 (TYP) 1500 1500 (TYP) (TYP) UP

M

BCT(6+1)

1800

SD1

7500

750

2

HEAVY DUTY FLOORING

PROTECTIVE STEEL PLATE COVER OVER EXP JOINT (TYP)

OWS/CRWS SUMP-3 & PUMP HOUSE

STEP

CEMENT CONCRETE FLOORING 1500

SLOPE 1:6

1200

15000

FIRE HYDRANT

V3 LOADING/ UNLOADING PLATFORM

CHKD APPD PEM/PC

600 WIDE R.C.C. SUNSHADE ABOVE

O

CABLE CELLAR

1800

RAMP UP

1500

7500

2

L

N

2 1

EXHAUST FANS OF 450MM DIA (TYP)

V3

400.98

1 2

STEP

33000

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

13

EXPANSION JOINT WITH POLYSULPHIDE SEALANT COVERED WITH PROTECTIVE STEEL PLATE

3

12000

A B

2

REF. DWG. NO.

B015-000-81-41-02421

Page 158 of 168

1

(A Govt. of India Undertaking) 6000

6000

6000

6000

3500

66550 73550

100.00

GROUND FLOOR PLAN

P

SUB STATION - 86 (CT) GROUND & FIRST FLOOR PLAN

SCALE

001:1 1

2

3

4

5

6

7

8

9

10

11

12

13

14

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 158 of 168

Page 75 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 1 3 A0-1189 x 841

P

F.R.L

A B

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

REF. DWG. NO.

B015-000-81-41-02422

Page 159 of 168

1

REFERENCE DRAWING TITLE

B015-000-81-41-02421 GROUND & FIRST FLOOR PLAN B015-000-81-41-02423 TERRACE PLAN & ELEVATION B015-000-81-41-02424 ELEVATIONS & SECTIONS B015-000-81-41-02425 DOORS & WINDOWS PROFILE

A

N NOTES :-

B

2

2 1000 HIGH R.C.C. PARAPET WALL WATER PROOFING AS/TENDER SPECS. R.C.C. SLAB AS/STRL. 750 WIDE R.C.C. GUTTER

C

C

900

TERRACE

WATER PROOFING AS/TENDER SPECS. R.C.C. SLAB AS/STRL. 750 WIDE R.C.C. GUTTER

900

RACK ROOM

900

D

900

1250

800

D

1800

3000

1800

FALSE CEILING

FALSE CEILING AT 4500 HEIGHT 4500

SWITCHGEAR HALL CUT-OUTS IN SWITCHGEAR HALL FLOOR SLAB SHALL BE AS PER RELEVANT STRUCTURE DRAWING

6500

7500

DISTRIBUTION TRANSFORMER

E

CAPACITOR BANK

5500

6500

CABLE CELLAR

100.150

100.300

100.150

F.F.L

TOP OF GRAVEL

100.300

100.00

TOP OF GRAVEL

100.00

F.F.L

F.R.L

F.R.L

F

F

SECTION 1-1

WEST ELEVATION

G

G

EXPANSION JOINT WITH POLYSULPHIDE SEALANT COVERED WITH PROTECTIVE STEEL PLATE

H

3

H

1 750 WIDE RCC GUTTER (TYP)

160 Ø R.W.P. (TYP)

V2 1485

W1

EQ.

W1

W1

W1

FLOOR TRAP

W1

W1

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

W1

AHU ROOM

TECH ROOM

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

900

D1

SLOPE 1:80

D2 FC

SUNK SLAB

I

HEAVY DUTY FLOORING

12000

VITRIFIED TILES FLOORING

LOADING/ UNLOADING PLATFORM

1000 HIGH S.S. RAILING

AC FC UD

TERRACE

UD

TERRACE

HEAVY DUTY FLOORING

TREAD-300 RISER-150 (max.)

J

2 2300

STEP UP

6000

J

SLOPE

1000 HIGH RCC PARAPET WALL (TYP)

TOILET

D/W

6000

1340

D2

I

SLOPE

W1

EQ. 115

LIF T SD1A SD1

4800

VITRIFIED TILE FLOORING

FD1

SD1

W1

W1

DN

2

FALSE FLOORING

RACK ROOM

AC FC FF UD

FIRE HYDRANT

L

DN

STEP DOWN TREAD-300

FALSE FLOORING

EPOXY PAINT ON FLOOR WITH 2500 MM HIGH EPOXY PAINT ON DADO/WALL

VITRIFIED TILES FLOORING

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

FF = FALSE FLOORING

FD2

750

UPS ROOM

BATTERY ROOM

V4

FC

FALSE FLOORING AC FC FF UD

ELECTRICAL ROOM

FF UD

VITRIFIED TILE FLOORING

K

AC = AIR CONDITIONED FC = FALSE CEILING UD = UNDERDECK INSULATION

AC FC

STEP UP

UP

RISER-150 (max.)

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

AC FC FF UD

SINK

1800

7500

UP

TREAD-300 RISER-150 (max.)

AIR LOCK LOBBY

1200 750

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

V4

FD2

FIRE HYDRANT

F.R.L. F.F.L. FD1

FALSE FLOORING

AC FC FF UD

LEGEND:

W1

W1

ENGINEERING ROOM

LOBBY 2 AL1

L

W1

W1

PROTECTIVE STEEL PLATE COVER OVER EXP JOINT (TYP)

SD1

FC

V4

W1

W1

FD1

1200

7500

33000

VITRIFIED TILE FLOORING

2

W1

W1 FD1

RAMP UP SLOPE 1:7

AC FC UD

AIR LOCK LOBBY

K

WALL TO BE CONSTRUCTED AFTER INSTALLATION OF EQUIPMENT

LOBBY 1

1000

AL1

FD1

V4

15000

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

E

FD1

W1

W1

W1 DN

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

6000

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

W1

W1

W1

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL,1000 HIGH

1500 SLOPE

W1

W1

W1

W1

W1

W1

M

1000 HIGH S.S. RAILING

2

TERRACE

W1

UP

SLOPE

W1

TERRACE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

2 1 0 C B A

N

160 Ø R.W.P. (TYP)

3500

3

6000

6000

6000

1

6000

6000

6000 66550

550

6000

6000

6000

6000

6000

3500

13.03.18 08.11.17 02.11.17 11.08.17 16.06.17 08.06.17

REVISED AS MARKED 2 & REISSUED FOR CONSTRUCTION REVISED AS MARKED & RE-ISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION ISSUED FOR DET. ENGG. ISSUED FOR TENDER ISSUED FOR COMMENTS

REV. DATE

73550

REVISIONS

O

SM SM SM SM SG SG

GJK GJK GJK GJK GJK GJK

BY

JS JS JS JS JS JS

N

W1

CHKD APPD PEM/PC

O

W1

SLOPE 1:80

W1

1000 HIGH S.S. RAILING

SLOPE 1:80

W1

SLOPE 1:80

W1

SLOPE 1:80

W1

SLOPE 1:80

M

W1

1500

W1

(A Govt. of India Undertaking)

P

SUB STATION - 86 (CT) द्वितीय

SCALE

001:1 1

2

3

4

5

6

7

8

9

10

11

12

13

14

दृश्य और काट

JOB NO.

SECOND FLOOR PLAN, ELEVATION & SECTION

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 159 of 168

Page 76 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 2 2 A0-1189 x 841

P

SECOND FLOOR PLAN

A B

2

3

4

5

6

7

8

9

10

11

12

13

15

16

REFERENCE DRAWING TITLE

B015-000-81-41-02421 GROUND & FIRST FLOOR PLAN B015-000-81-41-02422 SECOND FLOOR PLAN, ELEVATION & SECTION B015-000-81-41-02424 ELEVATIONS & SECTIONS B015-000-81-41-02425 DOORS & WINDOWS PROFILE

A

N NOTES :-

B

C

C

D

D

E

E

2300

600 HIGH RCC PARAPET WALL (TYP)

F 7500

F

15000

1

G

G

1

SLO

PE

SLO

PE

SLO

PE

7500

NORTH ELEVATION

H 160 Ø PVC RAIN WATER PIPE (TYP.) 3500

160 Ø PVC RAIN WATER PIPE (TYP.)

SLOPE

SLOPE

750 WIDE RAIN WATER GUTTER (TYP)

SLOPE

SLOPE

SLOPE

SLOPE

3

1000 HIGH RCC PARAPET WALL (TYP) SLOPE

SLOPE

1

SLOPE

I

I

MUMTY PLAN SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

6000

TERRACE BELOW

12000

600 HIGH RCC PARAPET WALL (TYP)

J

A MONORAIL BEAM TO BE PROVIDED INSIDE THE MACHINE ROOM (BOTTOM OF BEAM = 2500mm FROM FFL) FOR INSTALLATION OF CHAIN PULLEY IN THE MACHINE ROOM.

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

F.R.L. F.F.L.

SLOPE

7500

7500

LI FT

160 Ø PVC RAIN WATER PIPE (TYP.)

PE

K

2

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

7500

33000

AC UD

E

EXPANSION JOINT WITH POLYSULPHIDE SEALANT COVERED WITH PROTECTIVE STEEL PLATE

K

AC = AIR CONDITIONED FC = FALSE CEILING UD = UNDERDECK INSULATION

FC

OP

SL

LIFT MACHINE ROOM

2

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

PE SLO

RIDGE LINE

LEGEND:

2300

6000

J

SLO 3500

L

SD2

L 15000

RIDGE LINE

SD2

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

DN

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

MUMTY PLAN

M

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

600 HIGH RCC PARAPET WALL (TYP)

1

SLOPE 1000 HIGH S.S. RAILING

6000

6000

PE

SLO

1000 HIGH S.S. RAILING

SLOPE 1:80

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH 1500

M

1

FIRE HYDRANT

750

DN

SLO PE

STAIRS AS/STRL.DESIGN WD. OF STAIRS-1500 TREAD-300 RISER-150 (max.) RAILING-STAINLESS STEEL, 1000 HIGH

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

DN

SLOPE 1:80

750

7500

SLOPE 1:80

SD2

SLOPE 1:80

SLO

V1

N

160 Ø PVC RAIN WATER PIPE (TYP.)

TERRACE BELOW

N

1 0 B A

SLO

PE

PE

V1 6000

3500

6000

6000

6000

6000

REVISED AS MARKED 1 & REISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION ISSUED FOR DET. ENGG. ISSUED FOR TENDER

REV. DATE

160 Ø R.W.P. (TYP)

3

13.03.18 08.11.17 11.08.17 16.06.17

REVISIONS

SM SM SM SG

GJK GJK GJK GJK

BY

JS JS JS JS

CHKD APPD PEM/PC

1 6000

6000

550

6000

6000

6000

6000

6000

3500

(A Govt. of India Undertaking)

66550

0

O

FIRE HYDRANT

1200

SD2

1200

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

14

REF. DWG. NO.

B015-000-81-41-02423

Page 160 of 168

1

MUMTY PLAN

73550

SUB STATION - 86 (CT) छत

SCALE

001:1 1

2

3

4

5

6

7

8

9

10

11

12

13

14

दृश्य

JOB NO.

TERRACE PLAN & ELEVATION

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 160 of 168

Page 77 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 3 1 A0-1189 x 841

P

TERRACE PLAN P

A B

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

REF. DWG. NO.

B015-000-81-41-02424

Page 161 of 168

1

REFERENCE DRAWING TITLE

B015-000-81-41-02421 GROUND & FIRST FLOOR PLAN B015-000-81-41-02422 SECOND FLOOR PLAN & SECTION B015-000-81-41-02423 TERRACE PLAN & ELEVATION B015-000-81-41-02425 DOORS & WINDOWS PROFILE

A

N NOTES :-

1000 HIGH R.C.C. PARAPET WALL WATER PROOFING AS/TENDER SPECS. R.C.C. SLAB AS/STRL.

B

LOBBY

3800

2500

AIR LOCK LOBBY

RACK ROOM

ENGINEERING ROOM

800

AIR LOCK LOBBY

FALSE CEILING 3000

FALSE CEILING

C

C MONORAIL

MONORAIL 1500 1500

FALSE CEILING AT 4500 HEIGHT

SWITCHGEAR HALL

D

600

3300 600

D

LOADING/ UNLOADING PLATFORM

4500

ROLLING SHUTTER

3300

LOADING/ UNLOADING PLATFORM

LOADING/ UNLOADING PLATFORM

LOADING/ UNLOADING PLATFORM

CABLE CELLAR 100.300

100.00

F.F.L

F.R.L

E

2

SECTION 2-2

F

F 1000 HIGH R.C.C. PARAPET WALL WATER PROOFING AS/TENDER SPECS. R.C.C. SLAB AS/STRL. 750 WIDE R.C.C. GUTTER

TERRACE

G

G

2700

LOBBY

2500

BATTERY ROOM

3800

2500

FALSE CEILING

AHU ROOM

CINDER FILLING

H 900

1250

H

FALSE CEILING AT 4500 HEIGHT

SWITCHGEAR HALL 4500

AHU ROOM

DISTRIBUTION TRANSFORMER

I 5500

I

2500

CUT-OUTS IN SWITCHGEAR HALL FLOOR SLAB SHALL BE AS PER RELEVANT STRUCTURE DRAWING 6500

AC PLANT ROOM

3000

CABLE CELLAR 100.300

100.150

100.300

100.00

F.F.L

TOP OF GRAVEL

F.F.L

F.R.L

2 J

J

SECTION 3-3

EAST ELEVATION

LEGEND: F.R.L. F.F.L.

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

K

K

AC = AIR CONDITIONED FC = FALSE CEILING UD = UNDERDECK INSULATION

FC AC UD

L

L

M

M

N

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

E

N

07.05.18 13.03.18 08.11.17 11.08.17

REVISED AS MARKED 2 & REISSUED FOR CONSTRUCTION REVISED AS MARKED 1 & REISSUED FOR CONSTRUCTION

ISSUED FOR CONSTRUCTION ISSUED FOR DET. ENGG.

REV. DATE

O

REVISIONS

SM SM SM SM

GJK GJK GJK GJK

BY

JS JS JS JS

CHKD APPD PEM/PC

O

2 1 0 A

(A Govt. of India Undertaking)

2

SUB STATION - 86 (CT) दृश्य और

SCALE

001:1 1

2

3

4

5

6

7

8

9

10

11

12

13

14

काट

JOB NO.

ELEVATIONS & SECTIONS

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 161 of 168

Page 78 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 4 2 A0-1189 x 841

P

SOUTH ELEVATION P

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

REF. DWG. NO.

1480 1480

EQ.

N 880

500

2490

2090

VISION PANEL AS PER SPECIFICATION

VISION PANEL AS PER SPECIFICATION

NOTES :-

900

1350

LATCH AND LOCKING SYSTEM

900

900

GLASS

B

1350

2490

2090

PRESSED STEEL FRAME

LATCH AND LOCKING SYSTEM

900

GLASS

OVER HEAD HYDRAULIC DOOR CLOSER (HEAVY DUTY)

PRESSED STEEL FRAME

DOOR STOPPER

TEAK WOOD BOTTOM RAIL 200x35

A

AL. FRAME GLASS

GLASS

GLASS

OVER HEAD HYDRAULIC DOOR CLOSER (HEAVY DUTY)

500

AL. FRAME GLASS

75 LONG ALUMINIUM TOILET DOOR LATCH

300x25x6 THK. M.S. HOLD FAST @ MAX. 600 C/C. 11.10 DIA. 150 LONG ALUMINIUM BUTT HINGES @ MAX. 600 C/C.

1335 C

TOWER BOLT

CHROMIUM PLATE BRASS COAT AND HAT HOOK FIXED WITH BRASS SCREWS. (INTERNAL SIDE OF THE DOOR)

TEAK WOOD LOCK RAIL 150x35

EQ.

REFERENCE DRAWING TITLE GROUND & FIRST FLOOR PLAN SECOND FLOOR PLAN, ELEVATION & SECTION TERRACE PLAN & ELEVATION ELEVATIONS & SECTIONS

980

12 THK. PARTICLE BOARD

75 LONG ALUMINIUM TOILET DOOR LATCH

EQ.

ALUMINIUM TOWER BOLT 150X10 mm.

TEAK WOOD TOP RAIL 100x35 TEAK WOOD FRAME OUT OF 125x65 TEAK WOOD STYLE 100x35

CHROMIUM PLATE BRASS COAT AND HAT HOOK FIXED WITH BRASS SCREWS. (INTERNAL SIDE OF THE DOOR)

B015-000-81-41-02421 B015-000-81-41-02422 B015-000-81-41-02423 B015-000-81-41-02424

1480 EQ.

2490

1180 ALUMINIUM TOWER BOLT 150X10 mm.

2090

A B

B015-000-81-41-02425

Page 162 of 168

1

DOOR STOPPER

C

ACRYLIC KICK PLATE 200X3 THICK. RUBBER BEADING

ELEVATION : D1

ELEVATION : D2

35 THK FULLY PANELLED DOOR SINGLE SHUTTER AS/EIL STD NO. 7-75-0066 D

OPENING SIZE REQUIRED NOS.

: :

OPENING SIZE REQUIRED NOS.

2

: :

DOOR HANDLE

DOOR HANDLE

POWDER COATED ALMN. GLAZED DOOR WITH 6mm THK TOUGHENED GLASS, DOUBLE LEAF AS/EIL STD NO. 7-75-0014.

0900x2100 04

OPENING SIZE REQUIRED NOS.

: :

RUBBER BEADING

ELEVATION :SD1

ELEVATION :SD1A

SAME AS AL1A, BUT SINGLE SHUTTER

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, DOUBLE SHUTTER AS/EIL.STD. 7-75-0071

SAME AS SD1, BUT AIRTIGHT

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

ELEVATION : AL2

ELEVATION : AL1

PVC DOOR SINGLE SHUTTER

1100x2100 02

LEGEND-

RUBBER BEADING

F. - FIXED GLASS. SH. - SIDE HUNG SHUTTER. TH. - TOP HUNG SHUTTER.

D

1500x2500 06

: :

1000x2100 06

: :

1500x2500 08

: :

1500x2500 02

2 1180

(6 EQ.PARTS)

E

600

F

600

980

ARCHITECTURAL FINISHES SCHEDULE OVER HEAD HYDRAULIC DOOR CLOSER (HEAVY DUTY)

F

F

F

F

F

F

LOADING/ UNLOADING PLATFORM

HEAVY DUTY FLOORING

TRANSFORMER/ CAPACITOR BANK/ POWER TRANSFORMER

GRAVEL

910

910

1350

LATCH AND LOCKING SYSTEM

900

CEMENT CONCRETE FLOORING

CABLE CELLAR

SKIRTING/ WALL BASE 125mm HIGH CEMENT PLASTER SKIRTING 125mm HIGH CEMENT PLASTER SKIRTING

G

DOOR STOPPER

ELEVATION : W1

ELEVATION : W2

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, SINGLE SHUTTER AS/EIL.STD. 7-75-0070

ALMN. GLAZED WINDOW POWDER COATED WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

ALMN. GLAZED WINDOW POWDER COATED WITH 6 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE.

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

: :

1000x2100 05

: :

1200x1800 46

: :

BOTTOM OF ROOF BEAM

F

580

ROOF BEAM

I

T.H.

SWITCHGEAR HALL

(5 EQ.PARTS) BOTTOM OF

T.H.

F

F

F

F

T.H.

AIR HANDLING UNIT

F

2990

ELEVATION : V1

ELEVATION : V1A

ELEVATION : V2

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE. OPENING SIZE : 2600x0600 REQUIRED NOS. : 24

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, FIXED TYPE.

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, OPENABLE TYPE.

OPENING SIZE REQUIRED NOS.

OPENING SIZE REQUIRED NOS.

2580

580

F

T.H.

F

125mm HIGH CEMENT CEMENT PLASTER + POP PUNNING + PLASTIC PLASTER SKIRTING EMULSION PAINT 125mm HIGH CEMENT CEMENT PLASTER + OIL PLASTER SKIRTING BOUND DISTEMPER

HEAVY DUTY FLOORING

: :

1500x0600 02

BATTERY ROOM

EPOXY PAINT

OPERATOR ROOM

VITRIFIED TILE FLOORING

2

(5 EQ.PARTS)

T.H.

125mm HIGH VITRIFIED TILES SKIRTING -

125mm HIGH GRANITE SKIRTING -

125mm HIGH VITRIFIED TILES SKIRTING

BOTTOM OF

F

T.H.

F

P

2

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

2500 MM HIGH EPOXY PAINT ON WALL OVER CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT ABOVE 2500MM HEIGHT

CEMENT PLASTER + OIL BOUND DISTEMPER

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

GYPSUM BOARD PANEL FALSE CEILING

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

UPS ROOM

FALSE FLOORING

-----

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

VITRIFIED TILE FLOORING

LOBBY

ELEVATION : V4

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

-----

125mm HIGH VITRIFIED TILES SKIRTING

K

L

M

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

2 07.05.18 REVISED AS MARKED 2 & REISSUED FOR CONSTRUCTION 1 13.03.18 REVISED AS MARKED 1 & REISSUED FOR CONSTRUCTION 0 08.11.17 ISSUED FOR CONSTRUCTION REV. DATE

VITRIFIED TILE FLOORING

125mm HIGH VITRIFIED TILES SKIRTING

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

VITRIFIED TILE FLOORING

125mm HIGH VITRIFIED TILES SKIRTING

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

O

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE. OPENING SIZE : 2600x0600 REQUIRED NOS. : 04

CEMENT PLASTER + OIL BOUND DISTEMPER

FALSE FLOORING

ELECTRICAL ROOM

ELEVATION : V3

CERAMIC TILES DADO UP TO CEILING

ENGG. ROOM

TECH. ROOM

ALMN. GLAZED VENTILATOR POWDER COATED WITH 5 mm THK TOUGHENED GLASS, PARTLY FIXED PARTLY OPENABLE TYPE. OPENING SIZE : 4000x0600 REQUIRED NOS. : 03

GYPSUM BOARD PANEL FALSE CEILING

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

T.H.

N

I

CEMENT PLASTER + OIL BOUND DISTEMPER

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

3500

580

T.H.

H

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

-----

ROOF BEAM F

CEMENT PLASTER + OIL BOUND DISTEMPER CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

FALSE FLOORING

3980

T.H.

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

G

RACK ROOM T.H.

(7 EQ.PARTS)

M

CEMENT PLASTER + OIL BOUND DISTEMPER

HEAVY DUTY FLOORING

GRANITE STONE FLOORING WITH ATI SLIP GROOVES

STAIRCASE

2

CEMENT PLASTER + OIL BOUND DISTEMPER

F

J

K

2600x0600 04

CEMENT PLASTER + OIL BOUND DISTEMPER CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

125mm HIGH CEMENT CEMENT PLASTER + OIL PLASTER SKIRTING BOUND DISTEMPER

NON-SLIP VITRIFIED TILE FLOORING

TOILET

: :

CEMENT PLASTER + OIL BOUND DISTEMPER CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

125mm HIGH CEMENT CEMENT PLASTER + POP PLASTER SKIRTING PUNNING + PLASTIC EMULSION PAINT

VITRIFIED TILE FLOORING

2410

J

CEILING FINISH

CEMENT CONCRETE FLOORING

F

AIR LOCK LOBBY

L

HEAVY DUTY FLOORING

1500

2580

(5 EQ.PARTS)

F

STORE & MAINTENANCE ROOM

3500x1800 01

(3 EQ.PARTS)

2580

T.H.

A C PLANT ROOM

580

H

ELEVATION : SD2

-----

WALL FINISH

N

S.H.

CEMENT PLASTER + POP PUNNING + PLASTIC EMULSION PAINT

2

3

4

5

SM SM SM

GJK GJK GJK

BY

JS JS JS

CHKD APPD PEM/PC

(A Govt. of India Undertaking)

COMBINATION OF MINERAL FIBRE TILES & GYPSUM BOARD PANEL FALSE CEILING

SUB STATION - 86 (CT) PROFILE OF DOORS/WINDOWS

SCALE

001:1 1

REVISIONS

O

2690 1180

S.H.

6

7

8

9

10

11

12

13

14

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

15

16

3-1641-0500 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 162 of 168

Page 79 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 0 2 4 2 5 2 A0-1189 x 841

P

2090

500

PRESSED STEEL FRAME VISION PANEL AS PER SPECIFICATION

FLOOR FINISH

ROOM 2690 1180

F

580

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

3480

(2 EQ.PARTS)

E

Page 163 of 168

HEAT LOAD ESTIMATION FOR VRMP

NHT CCR BUILDING

VIZAG REFINERY EXPANSION PROJECT 08-NOV-2019 SUTHAR KETANBHAI (C360) 163 of 168

Page 80 of 82

1000 HIGH R.C.C. PARAPET WALL WATER PROOFING (AS/SPECS.) R.C.C. SLAB AS/ STRL. DETAIL

N

REFERENCE DRAWING TITLE

NOTES:

750 WIDE R.C.C. GUTTER

1000

1. ALL DIMENSIONS ARE IN MILLIMETRES & LEVELS IN METRES. 2. EL100.000 INDICATES FINISHED APPROACH ROAD LEVEL NEAR THE BUILDING. 3. UNDERDECK INSULATION SHALL BE PROVIDED UNDER THE ROOF OF AC PACKAGE ROOM AND OTHER AC AREAS. 4. ALL OUTSIDE SURFACES SHALL BE FINISHED WITH 18MM. THK PLAIN CEMENT PLASTER ON BRICK SURFACES & 6MM THK PLAIN CEMENT PLASTER ON R.C.C. SURFACES, EXCEPT SAND FACE PLASTER WHEREVER MENTIONED. 5. ALL INTERNAL PERIPHERIAL WALLS SHALL BE FINISHED WITH 12MM THK PLAIN CEMENT PLASTER & 12MM/15MM THK PLAIN CEMENT PLASTER ON EITHER SIDE OF INTERNAL WALLS. 6MM THK PLAIN CEMENT PLASTER SHALL BE PROVIDED ON BOTTOM / UNDERSIDE OF ROOF. 6. 1000 WIDE PLINTH PROTECTION WITH BUILDING DRAIN SHALL BE PROVIDED ALL AROUND THE BUILDING. 7. ALL DOORS IN AC AREAS SHALL BE AIR TIGHT. 8. FOR INTERNAL AND EXTERNAL FINISHES, ENGINEERING DESIGN BASIS SHALL BE REFERRED. 9. FOR EXACT COORDINATES, LOCATION RESPECTIVE AREA DRAWING SHALL BE REFERRED. 10. LAN, TELEPHONE, SEATING POSITION IN SHIFT INCHARGE SHALL BE FINALISED INITIALLY TO AVOID REWORK ON PLASTERED SURFACES. 11. PROVISION OF STANDBY CEILING FANS ON WALL TO BE MADE IN ALL THE AREAS.

SHIFT INCHARGE ROOM

FALSE CEILING

PASSAGE

3000

B015-000-81-41-12821

100.450 100.00

100.00

F.R.L

F.R.L

F.F.L

19500

12. OTHER FACILITIES TO BE PROVIDED ARE AS FOLLOWS:

SECTION X-X

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

NORTH ELEVATION

A. A SMALL CHAIR/ SOFA TO BE PROVIDED IN WASH ROOMS/ CHANGE ROOMS. B. INDIVIDUAL LOCKERS WITH PROPER KEY AND LOCK SYSTEM TO BE PROVIDED. C. PROPER SIGNBOARD (HE/SHE, LADIES/GENTS WASHROOM) TO BE DISPLAYED IN ALL WASHROOMS. D. FOR ALL WESTERN/ INDIAN FACILITIES, WATER GUNS/ JET SPRAY TO BE PROVIDED. E. HAND DRIER IN ALL THE WASHROOMS TO BE PROVIDED. F. FOLLOWING FACILITIES IN ALL THE WASHROOMS TO BE PROVIDED. · FULL SIZE MIRROR · LIQUID HAND WASH · BATHROOM FRESHENERS · TOWELS · PROPER LIGHTING FACILITIES · TISSUE ROLLS · VENDING MACHINE FOR SANITARY NAPKINS, SANITARY DISPOSAL DUSTBIN & PAPER WRAPS FOR DISPOSAL IN LADIES WASHROOM

SCHEDULE OF DOORS & WINDOWS TYPE OPENING SIZE FRAME SIZE

100.00 F.R.L

19500

SOUTH ELEVATION

LINTEL DESCRIPTION LEVEL

NOS.

m m6 HT IW ROOD DEZALG . NMLA DETAOC REDWOP AL1 1100x2100 1080x2090 2100 RETTUHS E LGN I S , S SALG DENEHGUOT . KHT

01

m m6 HT IW ROOD DEZALG . NMLA DETAOC REDWOP AL2 1200x2100 1180x2090 2100 RETTUHS E LGN I S , S SALG DENEHGUOT . KHT

01

RETTUHS E LBUOFD1 D , ROO D DEZALG , 1480x2090 DETAR ER I F 2100 RH - 2 1500x2100 . NO I TAC I F I CEP S S ' RERUTCAFUNAM REP SA

01

D1

1100x2100

1080x2090

2100

35mm THK. PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

02

D2

900x2100

880x2090

2100

35mm THK. PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

02

SD1

1200x2100

1180x2090

2100

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, 01 AIR-TIGHT,SINGLE SHUTTER AS/EIL.STD. 7-75-0070

EAST ELEVATION X

E-752.37 N-875.72

D2

HEAVY DUTY FLOORING

2500

1600

F.R.L

FC UD

NHT/CCR UNIT

Y

VITRIFIED TILE FLOORING

BATH

F.R.L. F.F.L.

100.00

DOCMETN/ STORE ROOM

SHIFT INCHARGE ROOM VITRIFIED TILE FLOORING AC FC UD

NON SLIP VITRIFIED TILE FLOORING

2

CAT LADDER

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

= 230 THK BRICK WALL = RCC BLAST RESISTANT WALL

N FC AC UD

AL1

G.LOCKER ROOM

UD

F.F.L

LEGEND:

STEP UP R = 150 T = 300

2

1400

BATH

EQ

NON SLIP VITRIFIED TILE FLOORING

FD1

1600

EQ

G. TOILET

AC PACKAGE ROOM

8500

BATH

100.450

115 900

11500

EQ

WC

EQ

1600

GRANITE FLOORING

FC UD

11.50 3

EQ EQ

3000

Y

FC UD

PASSAGE

D1

NON SLIP VITRIFIED TILE FLOORING

NON SLIP VITRIFIED TILE FLOORING

WC WC

L.LOCKER ROOM

D2

L. TOILET FC UD

45°

WC

1600

1000 WIDE PLINTH PROTECTION (TYP.)

300 DIA EXHAUST FAN AT 3000 HEIGHT WITH RCC HOOD (TYP.)

FIELD ROOM (BLAST RESISTANT) NHT/CCR 19.5X11.5

AC = AIR CONDITIONED (SPLIT TYPE AC) FC = FALSE CEILING UD = UNDERDECK INSULATION

BLAST RESISTANT STRUCTURE

3 19.50

D1

SD1

F.F.L

PASSAGE

VITRIFIED TILE FLOORING

AL2

GRANITE FLOORING

AC FC UD

1000

100.450

1900

DINING ROOM

RAMP UP 1:12

45°

Page 164 of 168

REF. DWG. NO.

B015-000-81-41-12822 TERRACE PLAN, ELEVATION, SECTION & PROFILES OF DOORS

D/W

0 G F E D C B A

100.00 F.R.L 160 dia PVC RWP EMBEDDED IN PCC (TYP.)

4500

3500

4500

750 WIDE RCC GUTTER ABOVE (TYP.) 7000

22.07.19 02.04.19 11.01.19 30.11.18 01.11.18 27.07.18 28.06.18 14.06.18

ISSUED FOR CONSTRUCTION REVISED AND REISSUED FOR ENGG. ISSUED FOR DET. ENGG. REVISED & REISSUED FOR COMMENTS/TENDER ISSUED FOR TENDER REVISED AND REISSUED FOR CLIENTS APPROVAL REISSUED FOR COMMENTS ISSUED FOR COMMENTS

REV. DATE

REVISIONS

SM SM SM SM SM SM SM SM BY

GJK GJK GJK GJK GJK GJK GJK GJK

JS JS JS JS JS JS JS JS

CHKD APPD PEM/PC

19500

KEY PLAN

X

GROUND FLOOR PLAN FIELD ROOM - NHT CCR SCALE

001:1

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

3-1641-0501 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 164 of 168

Page 81 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 1 2 8 2 1 0 A1-841 x 594

REFERENCE DRAWING TITLE

N 1080

1080

1480

1180

1180

880

NOTES:

DEZALG .M NLADETA O CRW O ED P .K H Tm m 6H TW IR O D ELG NIS ,SSALGDENEH G U O T RETT U HS

DEZALG .M NLADETA O CRW O ED P .K H Tm m 6H TW IR O D ELG NIS ,SSALGDENEH G U O T RETT U HS

OPENING SIZE = 1100X2100

,R O DDEZALG ,DETARERIFR H -2 REP SARETT U HS ELB U O D .N OITACIFICEPS S 'RER U TCAFU N M A OPENING SIZE = 1500X2100

2090

2090

2090

2090

2090

1. ALL DIMENSIONS ARE IN MILLIMETRES & LEVELS IN METRES. 2. FOR ALL OTHER NOTES, REFER DWG. NO. B015-000-81-41-12821.

2090

B015-000-81-41-12822

35mm THK. WOODEN PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

35mm THK. WOODEN PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, AIR-TIGHT,SINGLE SHUTTER AS/EIL.STD. 7-75-0070

OPENING SIZE = 1100X2100

OPENING SIZE = 900X2100

OPENING SIZE = 1200X2100

OPENING SIZE = 1200X2100

PROFILES OF DOORS

300

1000

1000 HIGH R.C.C. PARAPET WALL WATER PROOFING (AS/SPECS.) R.C.C. SLAB AS/ STRL. DETAIL

FALSE CEILING

230 300 230

GENTS TOILET 3000

1000

100.00

DOCMETN/ STORE ROOM

100.450

SHIFT INCHARGE RM. 3000

1000

F.F.L

F.R.L

SECTION Y-Y

WEST ELEVATION

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

8500

SLOPE 1:80

3000

1000 HIGH RCC PARAPET WALL (TYP)

11500

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

(SCALE - 1:50)

0 30

Page 165 of 168

REF. DWG. NO.

B015-000-81-41-12821 PLANS, ELEVATIONS & SECTION

1000

CAT LADDER

SLOPE 160 Ø PVC RAIN WATER PIPE (TYP.)

SLOPE

SLOPE

SLOPE

SLOPE

750 WIDE RCC GUTTER (TYP.)

4500

3500

4500 19500

7000

0 22.07.19 ISSUED FOR CONSTRUCTION B 02.04.19 REVISED AND REISSUED FOR ENGG. A 11.01.19 ISSUED FOR DET. ENGG. REV. DATE

REVISIONS

SM SM SM BY

GJK GJK GJK

JS JS JS

CHKD APPD PEM/PC

TERRACE PLAN FIELD ROOM - NHT CCR SCALE

001:1

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

3-1641-0501 REV.2

08-NOV-2019 SUTHAR KETANBHAI (C360) 165 of 168

Page 82 of 82

REV.

B 0 1 5 0 0 0 8 1 4 1 1 2 8 2 2 0 A1-841 x 594

Page 166 of 168

The Arch dwg of substation (CT ) is as per current revision. However, the current revision of Field Room for NHT CCR is attached. Although there is no change is the area under Air conditioning wrt Rev 0, it is advisable that contractor shall use the latest arch drawing.

08-NOV-2019 SUTHAR KETANBHAI (C360) 166 of 168

REF. DWG. NO.

REFERENCE DRAWING TITLE TERRACE PLAN, ELEVATION, SECTION & PROFILES OF DOORS

1000 HIGH R.C.C. PARAPET WALL WATER PROOFING (AS/SPECS.) R.C.C. SLAB AS/ STRL. DETAIL

N

NOTES:

750 WIDE R.C.C. GUTTER

1000

1. ALL DIMENSIONS ARE IN MILLIMETRES & LEVELS IN METRES. 2. EL100.000 INDICATES FINISHED APPROACH ROAD LEVEL NEAR THE BUILDING. 3. UNDERDECK INSULATION SHALL BE PROVIDED UNDER THE ROOF OF AC PACKAGE ROOM, OTHER AC AREAS AND AS MARKED IN THE DRAWING. 4. ALL OUTSIDE SURFACES SHALL BE FINISHED WITH 18MM. THK PLAIN CEMENT PLASTER ON BRICK SURFACES & 6MM THK PLAIN CEMENT PLASTER ON R.C.C. SURFACES, EXCEPT SAND FACE PLASTER WHEREVER MENTIONED. 5. ALL INTERNAL PERIPHERIAL WALLS SHALL BE FINISHED WITH 12MM THK PLAIN CEMENT PLASTER & 12MM/15MM THK PLAIN CEMENT PLASTER ON EITHER SIDE OF INTERNAL WALLS. 6MM THK PLAIN CEMENT PLASTER SHALL BE PROVIDED ON BOTTOM / UNDERSIDE OF ROOF. 6. 1000 WIDE PLINTH PROTECTION WITH BUILDING DRAIN SHALL BE PROVIDED ALL AROUND THE BUILDING. 7. ALL DOORS IN AC AREAS SHALL BE AIR TIGHT. 8. FOR INTERNAL AND EXTERNAL FINISHES, ENGINEERING DESIGN BASIS SHALL BE REFERRED. 9. FOR EXACT COORDINATES, LOCATION RESPECTIVE AREA DRAWING SHALL BE REFERRED. 10. LAN, TELEPHONE, SEATING POSITION IN SHIFT INCHARGE SHALL BE FINALISED INITIALLY TO AVOID REWORK ON PLASTERED SURFACES. 11. PROVISION OF STANDBY CEILING FANS ON WALL TO BE MADE IN ALL THE AREAS.

PASSAGE

3000

3000

3000

FALSE CEILING

100.450 100.00

100.00

F.R.L

F.F.L

F.R.L

19500

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

A. A SMALL CHAIR/ SOFA TO BE PROVIDED IN WASH ROOMS/ CHANGE ROOMS. B. INDIVIDUAL LOCKERS WITH PROPER KEY AND LOCK SYSTEM TO BE PROVIDED. C. PROPER SIGNBOARD (HE/SHE, LADIES/GENTS WASHROOM) TO BE DISPLAYED IN ALL WASHROOMS. D. FOR ALL WESTERN/ INDIAN FACILITIES, WATER GUNS/ JET SPRAY TO BE PROVIDED. E. HAND DRIER IN ALL THE WASHROOMS TO BE PROVIDED. F. FOLLOWING FACILITIES IN ALL THE WASHROOMS TO BE PROVIDED. FULL SIZE MIRROR LIQUID HAND WASH BATHROOM FRESHENERS TOWELS PROPER LIGHTING FACILITIES TISSUE ROLLS VENDING MACHINE FOR SANITARY NAPKINS, SANITARY DISPOSAL DUSTBIN & PAPER WRAPS FOR DISPOSAL IN LADIES WASHROOM

SCHEDULE OF DOORS & WINDOWS TYPE OPENING SIZE FRAME SIZE

100.00

LINTEL DESCRIPTION LEVEL

NOS.

AL1

1100x2100

1080x2090

2100

02

AL2

1200x2100

1180x2090

2100

01

FD1

1500x2100

1480x2090

2100

D1

1100x2100

1080x2090

2100

35mm THK. PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

02

D2

900x2100

880x2090

2100

35mm THK. PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

03

SD1

1200x2100

1180x2090

2100

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, 01 AIR-TIGHT,SINGLE SHUTTER AS/EIL.STD. 7-75-0070

F.R.L

19500

SOUTH ELEVATION

01

EAST ELEVATION X

E-752.37 N-875.72

1000 WIDE PLINTH PROTECTION (TYP.)

300 DIA EXHAUST FAN AT 3000 HEIGHT WITH RCC HOOD (TYP.)

EQ

NON SLIP VITRIFIED TILE FLOORING

L. TOILET NON SLIP VITRIFIED TILE FLOORING

1400

FC UD

WC

LEGEND: F.R.L. F.F.L.

= FINISHED ROAD LEVEL = FINISHED FLOOR LEVEL

F.F.L

FD1

G. TOILET

1600

NON SLIP VITRIFIED TILE FLOORING

PE

D2

AC PACKAGE ROOM

2500

FC UD

FC UD

D2

N FC AC UD

AL1

AC = AIR CONDITIONED FC = FALSE CEILING UD = UNDERDECK INSULATION

AL1

SHIFT INCHARGE ROOM

FC UD

VITRIFIED TILE FLOORING AC FC UD

NON SLIP VITRIFIED TILE FLOORING

UD

Y

VITRIFIED TILE FLOORING

BATH

G.LOCKER ROOM

HEAVY DUTY FLOORING

= RCC BLAST RESISTANT WALL

DOCMETN/ STORE ROOM

2

EQ

BATH

11.50 3

SLO

PASSAGE GRANITE FLOORING

100.450

1600

EQ

EQ

WC

BATH

115 900

1600

D1

FC UD

= 230 THK BRICK WALL

EQ

WC

L.LOCKER ROOM

D2

EQ

3000

1600

11500

F.R.L

2000

WC

Y

100.00

STEP UP

R = 150 T = 300

8500

BLAST RESISTANT STRUCTURE

2

CAT LADDER

3 19.50

D1

SD1

DINING ROOM

100.450 F.F.L

PASSAGE

VITRIFIED TILE FLOORING

AL2

GRANITE FLOORING

AC FC UD

1000

RAMP UP 1:12

1900

izLrqr vkjs[k ,oa blesa fufgr fMt+kbu bathfu;LkZ bafM;k fyfeVsM dh LkaifRr gSA ;s ek= m/kkj fn, x, gSa vkSj m/kkjdrkZ us ;g Li"V Lke>kSrk fd;k gS fd u rks mUgsa iqu% eqfnzr fd;kk tk,xk] u udy dh tk,xh] u m/kkj fn, tk,axs] u iznf'kZr fd, tk,axs vkSj u gh Lkhfer vkSj futh iz;ksx ds vykok budk dksbZ vU; iz;ksx gksxk vkSj ;g iz;ksx m/kkj nsus okys }kjk m/kkjdrkZ dks fyf[kr :i esa nh xbZ Lkgefr Lks gksxk A

Page 167 of 168

12. OTHER FACILITIES TO BE PROVIDED ARE AS FOLLOWS:

SECTION X-X

NORTH ELEVATION

100.00 F.R.L 160 dia PVC RWP EMBEDDED IN PCC (TYP.)

4500

3500

4500

750 WIDE RCC GUTTER ABOVE (TYP.) 7000 DATE

REVISIONS

BY

CHKD APPD

19500

X

GROUND FLOOR PLAN 08-NOV-2019 SUTHAR KETANBHAI (C360) 167 of 168

KEY PLAN okbtSx fjQkbujh uohuhdj.k izkstSDV QhyM :e&,u,pVh lhlhvkj SCALE

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

3-1641-0501 REV.2

REV.

A1-841 x 594

REF. DWG. NO.

REFERENCE DRAWING TITLE PLANS, ELEVATIONS & SECTION

N 1480

1080

1180

880

NOTES:

EQ.

2090

2090

2090

1. ALL DIMENSIONS ARE IN MILLIMETRES & LEVELS IN METRES. 2. FOR ALL OTHER NOTES, REFER DWG. NO. B015-000-81-41-12821.

1100

2090

EQ.

2090

1180

2090

1080

CONTRACTOR TO CHECK SIZE OF OPENING OF DOORS/WINDOWS/VENTILATORS AT SITE BEFORE FABRICATION OF THE SAME.

OPENING SIZE = 1500X2100 OPENING SIZE = 1100X2100

35mm THK. WOODEN PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

35mm THK. WOODEN PANEL DOOR SHUTTER, SINGLE LEAF AS/EIL STD.

PRESSED STEEL DOOR WITH PRESSED STEEL FRAME, AIR-TIGHT,SINGLE SHUTTER AS/EIL.STD. 7-75-0070

OPENING SIZE = 1100X2100

OPENING SIZE = 900X2100

OPENING SIZE = 1200X2100

OPENING SIZE = 1200X2100

PROFILES OF DOORS

300

FALSE CEILING

GENTS TOILET 3000

1000

100.00

DOCMETN/ STORE ROOM

100.450

SHIFT INCHARGE RM.

3000

230 300 230

3000

1000

0

Page 168 of 168

1000

The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

1000 HIGH R.C.C. PARAPET WALL WATER PROOFING (AS/SPECS.) R.C.C. SLAB AS/ STRL. DETAIL

30

F.F.L

F.R.L

SECTION Y-Y

WEST ELEVATION

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

SLOPE 1:80

11500

3000

1000 HIGH RCC PARAPET WALL (TYP)

8500

CAT LADDER

1000

izLrqr vkjs[k ,oa blesa fufgr fMt+kbu bathfu;LkZ bafM;k fyfeVsM dh LkaifRr gSA ;s ek= m/kkj fn, x, gSa vkSj m/kkjdrkZ us ;g Li"V Lke>kSrk fd;k gS fd u rks mUgsa iqu% eqfnzr fd;kk tk,xk] u udy dh tk,xh] u m/kkj fn, tk,axs] u iznf'kZr fd, tk,axs vkSj u gh Lkhfer vkSj futh iz;ksx ds vykok budk dksbZ vU; iz;ksx gksxk vkSj ;g iz;ksx m/kkj nsus okys }kjk m/kkjdrkZ dks fyf[kr :i esa nh xbZ Lkgefr Lks gksxk A

(SCALE - 1:50)

SLOPE

WATER PIPE (TYP.)

SLOPE

SLOPE

SLOPE

SLOPE

750 WIDE RCC GUTTER (TYP.)

4500

3500

4500

7000

19500 DATE

TERRACE PLAN 08-NOV-2019 SUTHAR KETANBHAI (C360) 168 of 168

REVISIONS

BY

CHKD APPD

okbtSx fjQkbujh uohuhdj.k izkstSDV SCALE

JOB NO.

UNIT

DIVN. DEPT.

DWG. NO.

3-1641-0501 REV.2

REV.

A1-841 x 594