Loading documents preview...
BUSHEHR PETROCHEMICAL COMPANY
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionation and Inter Connection Pipeline Between Plants Project P.O. No.: 05-POR-MA-305-119 Main steam Steam turbine turbine datasheet Document Title: Main datasheetfor 05-330-PKU-1
Rev.: 01 Page 1 of 12
Document No.: BU-05-VD-305-MA-DSH-3301-002
Main Steam Turbine datasheet for 05-330-PKU-1 EQUIPMENT NAME: DRIVE PROPANE COMPRESSOR STEAMTURBINE
General Comments: (1) All changes/modification with respect to previous revision should have revision mark (highlight) and SBW is responsible for any change/modification without revision mark. (2) Please manage to keep up to date, Condenser datasheet & Utility consumption list based on this datasheet.
Code1
(Approved ) No comment and the document is released for Manufacturing
Code2
(Approved with comments) Vendor shall correct, revise and resubmit the document The document is released for manufacturing (Commented) : Vendor shall correct / revise & resubmit document
Code3
Please see more comments on other pages...
Code4
Not Acceptable Quality (Rejected) Date: 20 Oct 2014 Dept: MA Signature: M.S. CODE 2
01
2014-9-30
Issued For Approval
WuT
HuangHA
HuangC
00
2014-4-2
Issued For Review
WuT
HuangHA
HuangC
Rev.
Date
Purpose of Issue
PRE’D
CHC’D
APP’D
Status
AUT’D
BUSHEHR PETROCHEMICAL COMPANY
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionation and Inter Connection Pipeline Between Plants Project P.O. No.: 05-POR-MA-305-119
Rev.: 01
Document Title: Main steam turbine datasheet
Page 2 of 12
Document No.: BU-05-VD-305-MA-DSH-3301-002
Revision Index Rev.
00
01
Sheet
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
02
03
04
05
06
07
Rev. Sheet
X X X X X X X X X X X X
X X X X X X X X X X X X
00
01
02
03
04
05
06
07
JOB NO.
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS
2 FOR
PROPOSAL
PURCHASE
3 SITE
BANDAR ASSALUYEH-IRAN
4 SERVICE
PROPANE COMPRESSOR DRIVER
CLIENT :
UNIT
ITEM CODE SR. NO.
PAGE
002
C-1-T
3 OF 12
Busher Petrochemical Company REV. :
1
330
SERIAL NUMBER NUMBER REQUIRED
HANGZHOU STEAM TURBINE CO., LTD
MODEL
COMPRESSOR
6 DRIVEN EQUIPMENT TYPE:
DSH
AS BUILT
SBW / BUSHER PETROCHEMICAL COMPANY
5 MANUFACTURER
DOC TYPE
330
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
HANGZHOU STEAM TURBINE CO., LTD 1 APPLICABLE TO:
UNIT
DRIVEN EQUIPMENT ITEM NO.
GENERATOR PURCHASER
7 NOTE: INFORMATION TO BE COMPLETED BY:
1(ONE)
NK50/63
05-330-C-1
OTHER MANUFACTURER
PURCHASER OR MANUFACTURER
PERFORMANCE
8 9 OPERATING POINTS
SHAFT
INLET
INDUCTION / EXTRACTION
EXHAUST
10 AS APPLICABLE TEMP. C (TT)
POWER kW
SPEED RPM
FLOW T/H
PRESSURE BARA
13 COMP. NORMAL
13896
3891
60.98
41
410
14 COMP. rated
15335
3980
67.36
41
410
14 COMP. CDR40% TD
12250
3844
55.11
41
410
16 TURBINE RATED
16869
3980
75.46
41
410
11
FLOW T/h
0
TEMP. C (TT)
PRESSURE BARG
0
TEMP. C (TT)
ENTHALPY kJ/kg
0.11
47.7
2403.1
0.116
48.8
2405.3
0.11
47.7
2420.9
0.126
50.4
2421.3
PRESSURE BARA
0
12
14 14 17
STEAM RATE, kg/kWh (3.45):
NOR
4.39
4.47
RATED
18 POTENTIAL MAXIMUM POWER (3.30)
INLET
20
EXHAUST
UNCONTROLLED
EXTRACTION
INDUCTION
22 FLOW T/H
23
NORMAL
60.98
60.98
COMP. rated
67.36
67.36
24
Turbine Rated
75.46
75.46
25
MAXIMUM
43
0.126
NORMAL
41
0.11
MINIMUM
39
0.11
MAXIMUM
430
PRESSURE BARA
26 27 28
TEMP. C (TT)
29
0
30
NORMAL
410
MINIMUM
400
EXTRACTION
INDUCTION
INDUCTION
SITE AND UTILITY DATA
31
ELECTRICAL:
32 LOCATION: (6.1.17) 33 INDOOR
HEATED PARTIAL SIDES
UNHEATED
UNDER ROOF
OUTDOOR
GRADE
MEZZANINE
36 WINTERIZATION REQUIRED 37 LOW TEMPERATURE
CLASS
40
ZONE
GROUP 2
DIVISION
GROUP
IIB
TEMP. RATING
T3
41 SITE DATA: 42
ELEVATION (m)
43
WINTER TEMP. (0C)
44
45
UNUSUAL CONDITIONS:
46
OTHER:
5 74~76
110
24
3
1
DC
50
50
35
MAX. RETURN (0C):
45
PRESSURE NORMAL (BAR):
5.5
DESIGN (BarG/℃):
8.5 / 85
0.99~1.1
WATER SOURCE VELOCITY (m/s):
INITIAL TEMPERATURE (0C) (TT) EXHAUST PRESSURE (BARG)
52
INSTRUMENT AIR ((BARa)
53
INSTRUMENT AIR DEW POINT (0C):
COOLING TOWERS MIN
CLEANLINESS COEFFICIENT :
COOLING WATER (m3/h): MAX
NORM
MIN
6
4.5
4
270
160
147
8
7.5
8.5 -40
MAX 80%
UTILITY CONSUMPTION:
47 UTILITY CONDITIONS: (6.1.18)
51
2
48
(4) + Sandstorm
50
CL-:
33
Thunder, and Lightning
INITIAL PRESSURE (BARa)
2.5
MAXIMUM ALLOWABLE PRESSURE DROP (BAR):
DESING WET BULB (0C)
FUMES
49
ALARM / SHUTDOWN
INLET TEMPERATURE (0C):
SUMMER TEMP. (0C)
DUST
48 AUXILIARY STEAM:
INSTRUMENT / CONTROL
400
MINIMUM RETURN PRESSURE (BARG):
BAROM. PRESS. (Bar)
32.2
REL. HUMIDITY (%)
54 REMARKS:
VOLTS
HEATING
COOLING WATER:
ELECTRICAL AREA CLASSIFICATION: (6.1.16)
39
DRIVERS
(3) Based on MOM; 05-301 & 05-301-MOMPHASE BUEI-SB-0001 dated 16 June 2014 item 24.1, TROPICALIZATION REQUIRED HERTZ relevant comment has been ignored so please keep CORROSIVE AGENTS kW AVAILABLE previous figures.
35 OTHER:
55
UNCONTROLLED
CONTROLLED
EXTRATION
21
38
CONTROLLED
STEAM CONDITIONS
19
34
INDUCTION EXTRACTION
INST. AIR (m3/h):
AUX. STEAM (kg/h): NORMAL
MAXIMUM
AUX. DRIVERS (kW): ELECTRIC
STEAM
HEATER(S) (kW):
OTHER
50ppm
JOB NO.
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS
UNIT
DOC TYPE
330
DSH
CLIENT :
OTHER
5
0 REV. :
0
1
SEE SPECIFICATION:
IPS-G-SF-900
APPLICABLE TO NEIGHBORHOOD:
VENDOR HAVING UNIT RESPONSIBILITY (3.48):
SEE SPECIFICATION:
05-330-C-1 PROPANE COMPRESSOR VENDOR
6
4 OF 12
APPLICABLE TO MACHINE:
BU-01_05-D-000-MA-SPF-102 General specification -"Special Purpose Steam Turbine"
4
PAGE
002
NOISE SPECIFICATIONS:
2 ISO 10437 (API 612), SPECIAL PURPOSE STEAM TURBINES 3
C-1-T
Busher Petrochemical Company
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T) 1 APPLICABLE SPECIFICATIONS:
ITEM CODE SR. NO.
YES
ACCOUSTICAL TREATMENT
7 GOVERNING SPECIFICATION, IF DIFFERENT:
NO
TYPE
8 CONSTRUCTIONAL FEATURES
9 10 TURBINE TYPE 11
BACKPRESSURE
CONDENSING
INDUCTION
SPEEDS:
EXTRACTION
12
MAXIMUM CONTINUOUS (rpm)
13
MAXIMUM ALLOWABLE (rpm)
4597(M)note1
TRIP (rpm)
4179
14 ■ LATERAL CRITICAL SPEEDS (DAMPED) (9.2) (AS PER API 612) 15
FIRST CRITICAL
16
SECOND CRITICAL
~3000
rpm
MODE
rpm
MODE
17
THIRD CRITICAL
rpm
MODE
18
FOURTH CRITICAL
rpm
MODE
19
OTHER
TORSIONAL CRITICAL SPEEDS (9.5):
VIBRATION
(microns)
25
FIRST CRITICAL
(rpm)
SECOND CRITICAL
(rpm)
THIRD CRITICAL
(rpm)
FOURTH CRITICAL
(rpm)
LATERAL ANALYSIS REPORT REQUIRED INDIVIDUAL BODY
TRAIN
UNDAMPED STIFFNESS MAP REQUIRED (9.2.3.b) TRAIN TORSIONAL ANALYSIS REPORT REQUIRED (9.5.1)
(PEAK TO PEAK)
TRAIN TORSIONAL ANALYSIS PERFORMED BY
20
COMPRESSOR VENDORS
21 CASINGS, NOZZLES AND DIAPHRAGMS 22
MAWP (3.17) (7.1.3)
23
INLET SECTION
24 25 26
HYDROTEST PRESSURE (16.3.2) (BARG)
HP CASING
INDUCTION / EXTRACTION SECTION
(BARG)
EXHAUST CASING
EXH. SECTION
OTHER
(BARG)
EXHAUST SECTION (0C)
INLET SECTION (0C)
28
INDUCTION / EXTRACTION SECTION
430
MINIMUM DESIGN METAL TEMPERATURE (11.1.15)
EXTRACTION
(BARG)
2
120
MID CASING
(BARG)
OTHER
(BARG)
NOZZLE RING
% ADM
DIAPHRAGM BLADE ATTACH:
INTEGRALLY CAST
WELDED
OTHER
(0C) (0C)
5
30 RELIEF VALVE SETTING INLET 31
(BARG)
68.25
WELDED NOZZLE RING (7.3.1)
MAXIMUM ALLOWABLE TEMPERATURE (3.16) (3.21)
27
29
0.7&FV
(BARG)
45.5
DIAPHRAGM AXIAL LOCATION:
INDIVIDUALLY
STACKED
(BARG) (BAR)
OTHER
(BARG)
32 CASING CONNECTIONS 33 34
CONNECTION
SIZE
FACING
POSITION
35 36 37 INLET
1*10"
38 EXHAUST
RTJ/1500LB
2200*1106MM
FLANGED
MATING
OR STUDDED
FLANGE & GASKET
(7.2.3)
BY VENDOR
DOWN
FLANGED
Y
DOWN
FLANGED
Y
MAX
MINIMUM
STEAM FLOW
STEAM FLOW
(kg/h)
(kg/h)
41
TAPERED
42 AUXILIARY SCREWED PIPE CONNECTION: 43 ALLOWABLE FORCES AND MOMENTS 44
STRAIGHT
INLET
45
PARALLEL
48
TO SHAFT
49
VERTICAL
50
HORIZONTAL 900
EXTRACTION / INDUCTION
MOMENT
FORCE
MOMENT
FORCE
MOMENT
N
Nm
N
Nm
N
Nm
51 52 53 note1:( M)=mechnical trip speed 54 note2: already provided and integrated by compressor vendor 55
ROTATION: (VIEWED FROM INLET END)
EXHAUST
FORCE
46 47
MAIN CASING JOINT STUDS / NUTS DESIGNED FOR HYDRO TENSIONING (7.1.15.f)
(2 times NEMA SM-23) note2
CCW
● CW
VIEW
STEAM
JOB NO.
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS
UNIT
DOC TYPE
330
DSH
CLIENT :
C-1-T
002
PAGE 5 OF 12
Busher Petrochemical Company
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
HANGZHOU STEAM TURBINE CO., LTD
ITEM CODE SR. NO.
0 0
REV. :
1
1 MATERIAL - CASING AND APPURTENANCES: 2
HIGH PRESSURE CASING
DIAPHRAGM / BLADE CARRIERS
GS-22Mo4
3 MID PRESSURE CASING
GS-C25&GS-22Mo4
DIAPHRAGM NOZZLES
4
EXHAUST CASING
5
STEAM CHEST
GS-22Mo4
6
NOZZLE RING
X22CrMoV12 1
7
STEAM CONTAMINANTS (11.1.6)
OTHER
Gr D
GS-C25
Bearing Housing:
Foulenss-0.00020m2*℃W
Comparison sheet of turbine materials between HTC code and others have been
8 STEAM PATH COMPONENTS < HRC 22 (11.1.9)
already supplied
9 10 ROTATING ELEMENTS (8) 11 SHAFT TYPE: 12
INTEGRAL WHEELS
BUILT-UP (8.1.2)
SHAFT ENDS: DIAMETER @ COUPLING
COMBINATION
13 DOUBLE EXTENDED 14
NUMBER OF STAGES
15
SHAFT MATERIAL
16 BLADES (BUCKETS):
25
BEARING SPAN
(mm)
2735
28CrMoNiV49
MAXIMUM TIP SPEED
17 FINAL STAGE BLADE LENGTH
(mm)
MAX
(mm)
STRAIGHT
TAPER
KEYED
SINGLE
HYDRAULIC FIT
INTEGRAL FLANGE
50
(mm/m)
DOUBLE
(m/s)
FIELD BALANCING PROVISIONS REQUIRED (8.1.4)
(mm)
DESCRIPTION OF FIELD BALANCING PROVISIONS:
18 REMARKS: 19
REMARKS:
20 21 22
STAGE 1
STAGE 2~24
STAGE 25
23 ■ WHEEL MATERIAL
28CrMoNiV49
28CrMoNiV49
28CrMoNiV49
24 ■ BLADE MATERIAL
X22CrMoV12 1
X22CrMoV12 1/X20Cr13
X20Cr13
FORK
T
FORK
25 ■ BLADE ROOT TYPE
STAGE
STAGE
STAGE
26 CLOSURE PIECE TYPE 27 ■ TIE WIRE MATERIAL
N.A
N.A
X20Cr13
28 ■ SHROUD MATERIAL
X22CrMoV12 1
X22CrMoV12 1
N.A
INTEGRAL
INTEGRAL
IMPULSE
REACTION
29 ■ SHROUD ATTACH. 30 PITCH DIAMETER (mm) 31 BLADE HEIGHT (mm) 32 ■ BLADE TYPE
REACTION
33 34 35 SHAFT SEALS (10.5) 36
INLET
EXHAUST
37 ■ MAXIMUM SEAL PRESSURE (BARG)
1.08
1.08
38 ■ STEAM LEAKAGE (kg/h)
11.5
-77.6 note1
CASING END SEALS (10.5.1): TYPE:
39 AIR LEAKAGE (m3/h)(STD. COND.)
MATERIAL:
LABYRINTH 1Cr18Ni9Ti(321)
40 SHAFT DIAMETER @ SEAL (mm) 41 ■ STATIONARY LABYRINTH TYPE 42 ■ ROTATING LABYRINTH TYPE 43 ■ MATERIAL
Flute
Sealing strip
Sealing strip
Sealing strip
1Cr18Ni9Ti(321)
1Cr18Ni9Ti(321)
INTERSTAGE SEALS (10.5.2): TYPE:
45
MATERIAL:
46 47 48 REMARKS: 49 50 51 52 53 54 55
LABYRINTH OTHER
44
note1:-77.6 means there is no steam leakage ,77.6 means seal steam consumption
1Cr18Ni9Ti(321)
OTHER
STAGE
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS
JOB NO.
UNIT
DOC TYPE
330
DSH
CLIENT :
C-1-T
PAGE 6 OF 12
002
Busher Petrochemical Company
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
HANGZHOU STEAM TURBINE CO., LTD
ITEM CODE SR. NO.
0 REV. :
0
1
1 BEARING AND BEARING HOUSINGS INLET
EXHAUST
TILTING PAD TYPE
TILTING PAD TYPE
Kingsbury
Kingsbury
Later
Later
200
250
UNIT LOADING MAX. (N)
Later
UNIT LOADING ULTIMATE (N)
Later
Later
20
20
NUMBER OF PADS
6
6
Later
Later
5
5
Later
Later
20
20
2 RADIAL (10.1) 3
TYPE
4
MANUFACTURER
5
LENGTH (mm)
6
SHAFT DIAMETER (mm)
* NOTE 1
THUST (10.2)
TYPE
BASE MATERIAL
9
BABBIT THICKNESS (mm)
10
NUMBER OF PADS
INACTIVE TILTING PAD TYPE
Kingsbury
Kingsbury
MANUFACTURER
7 UNIT LOAD (ACT / ALLOW) (N) 8
ACTIVE TILTING PAD TYPE
AREA (mm2) PIVOT: CENTER/OFFSET (%)
11 LOAD: BETWEEN / ON PAD
PAD BASE MATERIAL
12 PIVOT: CENTER / OFFSET (%)
(4) 13
LUBRICATION:
FLOODED
DIRECTED
14
Each RTD shall be dual Element Type. Please mention "Dual Element RTD"
THRUST COLLOR:
INTEGRAL
REPLACEABLE
15 BEARING TEMPERATURE DEVICES: 16 THERMOCOUPLES
VIBRATION DETECTORS:
TYPE PURCHASEER
17 SELECTION SWITCH AND INDICATOR BY: 18 18
RESISTANCE MATERIAL
23
SCALE RANGE
24
SHUTDOWN SET @
PURCHASEER
(Ohm)
LOCATION
0~200
ALARM SET @
115
ACTIVE SIDE
27
TOTAL
CCR
(0C)
SHUT DOWN
(0C)
105
DELAY
(s)
SET @
Bearing Metal
INACTIVE SIDE TOTAL
2
LOCATION
Bearing Metal
30
SCALE RANGE
31
SHUTDOWN SET @
0~200
ALARM SET @
115
MONITOR SUPPLIED BY:
33
LOCATION
34
MANUFACTURER
(0C)
105
DELAY
CCR
3500 50
(microns)
DELAY
(s)
MODEL
CR
SCALE RANGE
(s)
SHUT DOWN
3
SBW
MANUFACTURER (0C)
3300
NUMBER REQUIRED
MONITOR SUPPLIED BY
ENCLOSURE
MODEL
B.N
SET @
ALARM
SET @
800
(microns)
3500 (microns)
560
DELAY
(s)
PROVISION FOR ACCELEROMETER MOUNTED ON BEARING HOUSINGS
COMP. VENDOR ENCLOSURE
MODEL
BENTLY NEVADA
SET @
(microns)
BENTLEY NEVADA
LOCATION
28 29
75
NON-CONTACTING
MANUFACTURER LOCATION
MODEL
ALARM
AXIAL POSITION DETECTORS:
TYPE
2
ENCLOSURE
BENTLY NEVADA
SCALE RANGE
Bearing Metal
4
TOTAL NUMBER SBW
MANUFACTURER LOCATION
2
MONITOR SUPPLIED BY
○ MANUFACTURER
LOCATION - THRUST BEARING
26
32
100
3300
BENTLEY NEVADA
NUMBER AT EACH SHAFT BEARING
Pt
2 per bearing
TOTAL
MODEL
NON-CONTACTING
MANUFACTURER
LOCATION - JOURNAL BEARING
22
25
MANUFACTURER
RESISTANCE TEMPERATURE DETECTORS
20 SELECTION SWITCH AND INDICATOR BY: 21
TYPE
RTD
KEYPHASOR: 3500
STEAM TURBINE
GEAR
DRIVEN EQUIPMENT
REMARKS:
35 36 37 38
* NOTE 1:
THE TURBING IS PRIOR TO APPLY THE TITLING PAD RADIAL
BEARING, BUT IF THE TITLING PAD BEARING CAN NOT PASS THE VIBRATION ANALYSIS, THE ELLIPTICAL BEARING WILL BE APPLIED.
39 LUBRICATION AND CONTROL OIL SYSTEM (15.5) 40 REFERENCE SPECIFICATIONS: 41 FURNISHED BY
BU-01_05-D-000-MA-SPF-101
TURBINE MANUFACTURER
OTHERS / SBW
OIL REQUIREMENTS:
CTRL OIL
LUBE OIL
■ NORMAL FLOW (m3/h)
~12
~17
42
SEPARATE FOR TURBINE ONLY
■ TRANSIENT FLOW (m3/h)
~30
43
COMMON WITH DRIVEN EQUIPMENT (15.5.2)(15.5.5):
■ PRESSURE (BAR)
0.85
0.25
45
45
ISO VG46
ISO VG46
10
10
44
■ TEMPERATURE (0C)
45 TURBINE MANUFACTURER TO SUPPLY:
TOTAL HEAT REJECTED (kW)
46
CONTROL OIL ACCUMULATOR
■ OIL TYPE (HC / SYNTHETIC)
47
STAINLESS STEEL OIL SUPPLY HEADING PIPING
VISCOSITY (cP @37.80C)
48
OIL DRAIN HEADER PIPING
■ FILTRATION (microns)
49 50 51 52 53 54 55
STAINLESS STEEL
CARBON STEEL
SIGHT FLOW INDICATORS CONTROL OIL FILTERS
SINGLE
DUAL compressor vender to supply
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS HANGZHOU STEAM TURBINE CO., LTD
JOB NO.
UNIT
DOC TYPE
330
DSH
PAGE
ITEM CODE SR. NO. 002
C-1-T
7 OF 12
Busher Petrochemical Company
CLIENT :
0
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
0
1
REV. :
ACCESSORIES
1 2 COUPLINGS AND GUARDS (15.1)
SEE COMPRESSOR DATA SHEET
3 NOTE: SEE ROTATING ELEMENTS - SHAFT ENDS 4 SEE ATTACHED ISO 10441 DATA SHEET 5 COUPLING FURNISHED BY
SBW
6 MANUFACTURER
TYPE
7 COUPLING GUARD FURNISHED BY 8 TYPE
MODEL
Flexible Diaphfragm
later
SBW
FULLY ENCLOSED
SEMI OPEN
OTHER VENDOR MOUNT HALF COUPLING (15.1.8)
9 COUPLING DETAILS 10 MAXIMUM OUTER DIAMETER
(mm)
11 HUB MASS
(kg)
12 ■ SPACER LENGTH
GREASE
(mm)
Min. 457
13 SPACER MASS
(kg)
IDLING ADAPTER REQUIRED (15.1.7)
MASS SIMULATOR (15.1.6) LUBRICATION REQUIREMENTS
CONT. OIL LUBE
NONE
QUANTITY PER HUB
14 15 MOUNTING PLATES (15.3) 16 BASEPLATES FURNISHED BY:
18 OPEN 19
SOLEPLATES FURNISHED BY:
SBW
17 UNDER TURBINE ONLY
SBW
NON-SKID DECKING (15.3.2.8)
LEVELING PADS (15.3.2.3)
DRIP RIM
(mm)
HOLD-DOWN BOLTS FURNISHED BY:
20 SINGLE SECTION
MULTI SECTION
21 COLUMN MOUNTING (15.3.2.2)
SUBPLATES REQUIRED (15.3.2.7)
22
THICKNESS
SUBPLATES REQUIRED (15.3.2.7)
LEVELING (CHOCK) BLOCKS REQUIRED
HTC
EPOXY PRIMER VENDOR (15.3.1.7)
SUPPLIED BY
SBW
ANCHOR BOLTS FURNISHED BY (15.3.1.9):
SBW
23 GEAR UNIT (15.2)
REFERENCE API 613
24 FURNISHED BY:
OTHER
25 SEE ATTACHED GEAR DATA SHEETS 26 CONTROL AND INSTRUMENTATION (12)
API 614, PAGES
27 INSTRUMENTS AND CONTROL PANELS SHALL BE 28 IN ACCORDANCE WITH THE FOLLOWING
API 670, PAGES
29 ATTACHED DATA SHEETS:
PURCHASER'S DATA SHEETS
30 31 PROTECTIVE DEVICES 32 33
EXHAUST RELIEF VALVE (7.1.3) (15.4.1) (15.4.2)
EXTRACT. / INDUCT. RELIEF VALVE (7.1.3) (15.4.1) (15.4.2)
VACUUM BREAKER (12.3.1.3)
NON-RETURN VALVE(S) (12.3.1.4)
THERMAL RELIEF VALVES(S) (15.4.4)
34 35 MOUNTING LOCATION
Exhaust Piping
36 SET RELIEF PRESSURE (BarG)
0.07
37 CAPACITY, STEAM (kg/h)
100%
38 VALVE MANUFACTURER 39 VALVE TYPE 40 VALVE SIZE / RATING 41 FLANGE FACING (FF, RF) 42 FURNISHED BY 43 QUANTITY 44 45 REMARKS: 46 47 48 49 50 51 52 53 54 55
condenser cooling water return line
HTC Water sealing spring type 150LB RF
RF
HTC
HTC
2
2
JOB NO.
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS HANGZHOU STEAM TURBINE CO., LTD 1
TRIP
TRIP & THROTTLE VALVES (12.3.4.1) MAIN INLET
INDUCTION
3 PROVIDED BY:
VENDOR
PURCHASER
5
SIZE
1*10"
DSH
CLIENT :
C-1-T
PAGE
002
8 OF 12
Busher Petrochemical Company 0 0
REV. :
STRAINER: OPENING SIZE
1.5
MATERIAL
(mm/MESH)
(MESH)
MATERIAL
RF
6 SIZE
RATING
FACING
■ STEM MATER 21Cr12MoV(X22CrMoV121) HARDNESS
(HRC)
7 SIZE
RATING
FACING
■ SEAT MATERIAL 21CrMoV(21CrMoV5 7) HARDNESS
(HRC)
PACKING MATERIAL
(kg/h)
8 CONSTRUCTION FEATURES: 9 RESET:
INLET
MANUAL
INDCUT.
HYDRAULIC
10 TRIP:
LOCAL (MANUAL)
REMOTE
11 EXERCISER:
LOCAL (MANUAL)
REMOTE
12
FULLY OIL OPERATED
1
1Cr18Ni9Ti(361)
TEMPORARY START-UP STRAINER
HYDRAULIC FACING
1500LB
ITEM CODE SR. NO.
DUPLICATE TRIP/TRIP AND THROTTLE VALVES REQUIRED (12.3.4.2)
MODEL
HTC RATING
DOC TYPE
330
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
2 LOCATION:
4 MANUFACTURER
UNIT
LEAK OFF
SPRING SUPPORT OF VALVE REQUIRED BY VENDOR
BY PURCHASER
13 GOVERNOR - CONTROLLED VALVE(S): 14 LOCATION:
INDUCTION
MAIN INLET
15 16 TRIP POSITION (OPEN/CLOSED)
INDUCTION
INDUCTION
EXTRACTION
EXTRACTION
NOTES
CLOSED
17 NUMBER OF VALVES
4 OR 5
18 CONNECTION SIZE
Later
19 RATING 20 FACING (RT, RTJ, OTHER)
Other
21 ACTION (CAM, BAR, OTHER)
BAR
22 STEM MATERIAL
21Cr12MoV
23 STEM MATERIAL HARDNESS, HRC 24 SEAT MATERIAL
21CrMoV
25 SEAT MATERIAL HARDNESS, HRC 26 PACKING MATERIAL
Graphite
27 PACKING LEAKOFF, kg/h) 28 29 30 31 MISCELLANEOUS
32 TURNING GEAR (15.8) 33
TURNING GEAR REQUIRED (15.8.1)
34
FURNISHED BY
35
TYPE (15.8.5)
36
ENGAGEMENT (15.8.2) (15.8.3) (15.8.4):
37
MANUFACTURER
38
MOUNTED BY
START-UP ASSISTANCE
VENDOR'S REVIEW & COMMENTS ON PURCHASER'S
HTC HYDRAULIC
HTC
SPEED
AUTO
(rpm)
MANUAL
MODEL
41 42
"Y" TYPE STRAINER
STATIC CONDUCTING BRUSHES
DRIVEN BY:
ELECTRIC MOTOR
STEAM TURBINE
(15.8.5)
HYD. / PNEUM. MOTOR
OTHER:
Turbine Washing Facilities
REMOTE
OPERATOR STATION (15.8.7)
LOCAL
43 INSULATION AND JACKETING (15.7) 44
PIPING AND FOUNDATION DRAWINGS (6.1.9)
VENDOR WITNESS INITIAL ALIGNMENT (6.1.9)
WATER WASHING CONNECTIONS
HTC
39 DRIVER: REFERENCE SPECIFICATION 40
BLANKET
47 EXTENT
SHUTDOWN ACTIVITIES EXHAUST VACUUM BREAKER (12.3.1.3)
SPECIAL TOOLS (15.9)
OTHER
LANTHANIDE MATERIAL COAT
45 JACKETING 46 CARBON STEEL
STAINLESS STEEL
COUPLING RING AND PLUG GAUGE
BY COMP. VENDOR
HYDRAULIC MOUNTING / REMOVAL KIT
BY COMP. VENDOR
OTHER SPREADER BEAM(S) (15.9.3)
48
ON LOAN
49
PURCHASE
50 51 52 53 54 55
25person-day
(DAYS)
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS HANGZHOU STEAM TURBINE CO., LTD
JOB NO.
UNIT
DOC TYPE
330
DSH
CLIENT :
ITEM CODE SR. NO. C-1-T
PAGE
002
9 OF 12
Busher Petrochemical Company
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
0 REV. :
0
1 GOVERNOR (12.2) 2 TYPE
DIGITAL PROCESSOR BASED
MANUFACTURER
3
OTHER
SUPPLIED BY
4
SIMPLEX
WOODWARD
MODEL
505E
HTC
MULTI-CPU
5 STEAM TURBINE TYPE 6 SINGLE VALVE SINGLE STAGE
DOUBLE AUTOMATIC EXTRACTION
5 SINGLE VALVE MULTI STAGE
SINGLE AUTOMATIC EXTRACTION/INDUCTION
8
DOUBLE AUTOMATIC EXTRACTION/INDUCTION
MULTI VALVE MULTI STAGE
OTHER
9 SINGLE AUTO EXTRACTION 10 DRIVEN EQUIPMENT TYPE 11
SYNCHROUS GENERATOR
CENTRIFUGAL COMPRESSOR
12 AXIAL COMPRESSOR
INDUCTION GENERATOR
13 CENTRIFUGAL PUMP
OTHER
14 SERVICE REQUIREMENTS 15 MECHANICAL DRIVE 16
GENERATOR DRIVE
DROOP CONTROL
SPEED CONTROL BY:
17
PROCESS VARIABLE
PRESSURE
FLOW
FREQUENCY CONTROL
18
EXTRACTION
PRESSURE
FLOW
LOAD CONTROL
19
INDUCTION
PRESSURE
FLOW
kW CONTROL
20
TURBINE INLET
PRESSURE
● FLOW
kW IMPORT/EXPORT CONTROL
21
TURBINE EXHAUST
PRESSURE
FLOW
LOAD SHEDDING
22
OTHER
AUTOMATIC SYNCHRONIZATION
23
AUTOMATIC VOLTAGE REGULATION
24
TURBINE INLET PRESSURE LIMITING
25
INLET PRESSURE LIMITER
26 INPUT / OUTPUT REQUIREMENTS 27 DISCRETE INPUTS
DISCRETE OUTPUTS
28
START OR RESET
COMMON SHUTDOWN
29
NORMAL STOP
COMMON ALARM
30
EMERGENCY TRIP
OVERSPEED TRIP
31
RAISE SPEED
REMOTE SPEED SET POINT ENABLED
32
LOWER SPEED
4513
PRESSURE CONTROL ENABLED
33 ENABLE/DISABLE REMOTE SPEED SET POINT
FLOW CONTROL ENABLED
34 RAMP TO MINIMUM CONTINUOUS
EXTRACTION CONTROL ENABLED
35
OVERSPEED TEST ENABLE
INDUCTION CONTROL ENABLED
36
ENABLE PRESSURE CONTROL
SPEED PICKUP ALARM OTHER
37 ENABLE EXTRACTION CONTROL 38
(rpm)
Ready to start
REMOTE ALARM CLEAR / ACKNOWLEDGE
39 ENABLE AUTO SYNCHRONIZE 40
CASCADE RAISE / LOWER
ANALOG OUTPUTS (4 mA TO 20 mA)
41 OTHER
SPEED
42 ANALOG INPUTS (4 mA TO 20 mA)
SPEED SET POINT
43
REMOTE SET POINT
44
PROCESS PRESSURE
REMOTE SPEED SET POINT EXTRACTION PRESSURE
45 EXTRACTION
PRESSURE
FLOW
46 kW IND. LOAD
PRESSURE
FLOW
47 kW IMPORT/EXPORT 48 49 50 51 52 53 54 55
OTHER
Inlet steam pressure
EXTRACTION PRESSURE SET POINT ACTUATOR POSITION PROCESS PRESSURE kW kW IMPORT/EXPORT
Note: This signal will be supplied by SBW
1
JOB NO.
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS HANGZHOU STEAM TURBINE CO., LTD
UNIT
DOC TYPE
330
DSH
CLIENT :
ITEM CODE SR. NO. C-1-T
002
PAGE 10 OF 12
Busher Petrochemical Company
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
0 0
REV. :
1
1 GOVERNOR INSTALLATION REQUIREMENTS 2 LOCATION
LOCAL (AT TURBINE)
3
REMOTE (CONTROL ROOM)
FLUSH MOUNT IN PANEL
4
OTHER
POWER SOURCE
SINGLE
DUAL
5
AREA CLASSIFICATION: Not Classified
400 V (A.C.)
MOUNTING
SURFACE MOUNT
VERTICAL RACK
6
CLASS
GROUP
DIVISION
110 V (A.C.)
7
ZONE
GROUP
TEMP. RATING
125 V (D.C.)
24 V (D.C.)
8 ENCLOSURE
IP 65
9
NEMA 4
10
NEMA 4X
11
OTHER
12 LOCAL GOVERNOR GAUGE BOARD
NOT REQUIRED
REQUIRED
13 LOCATION
LOCAL
14
REMOTE (CONTROL ROOM)
NEMA 4
IP 65
15
OTHER
OTHER
ENCLOSURE
NEMA 4X
16
AREA CLASSIFICATION:
17 OUTPUTS FROM PANEL TO GOVERNOR
CLASS
GROUP
18
START
19
TRIP
20
RAISE
COMMON ALARM TRIP
21
LOWER
TRIP LAMP
22
OVER SPEED TEST
REMOTE SETPOINT ENABLED LAMP
23
RAMP TO MINIMUM CONTINUOUS
24
REMOTE SET POINT ENABLE / DISABLE
25
26
ZONE
2
GROUP
DIVISION IIB
TEMP. RATING
T3
INPUTS TO PANEL FROM GOVERNOR
SPEED SETPOINT METER
OTHER
RESET
OTHER
27 MISCELLANEOUS GOVERNOR DETAILS 28 GOVERNOR ACTION ON LOSS OF REMOTE SIGNAL:
LOCKS ON LAST VALUE
29
GOES TO MINIMUM CONTINUOUS
30
GOES TO MAXIMUM CONTINUOUS
31 32 EXTERNAL INTERFACE DEVICE TYPE:
PRINTER
33
CRT
TABULAR DATA
34
MODEM
TRENDING (REAL TIME)
FORMAT:
GRAPHIC DISPLAY
HISTORICAL ARCHIVING
35 36 DISTRIBUTIVE CONTROL SYSTEM MANUFACTURER
MODEL
37 DATA TRANSMISSION
DATA LINK
38
DISCRETE I/O
PROTOCOL
39
NETWORK TYPE
40 41 GOVERNOR SPEED PICKUP SENSORS (12.2.6): 42 MANUFACTURER 43
MODEL
AIRPAX
NUMBER OF TEETH IN SPEED SENSING SURFACE
INSTALLATION:
MPU
DUAL
TRIPLE
INSTALLED SPARE
60
44 45 ACTUATOR(S):
SUPPLIED BY
46 ACTUATOR TYPE
HYDRAULIC
MANUFACTURER
HTC
PNEUMATIC
SINGLE COIL
VOITH
MULTI COIL
MODEL
E360
OTHER
47 48 TURBINE MOUNTED ACCESSORIES 49 TACHOMETER
MANUFACTURER
50
LOCATION(S)
51 52 53 54 55
AIRPAX LOCAL PANEL
MODEL
NUMBER REQUIRED
2
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS
JOB NO.
UNIT
DOC TYPE
330
DSH
CLIENT :
C-1-T
002
PAGE 11 OF 12
Busher Petrochemical Company
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
HANGZHOU STEAM TURBINE CO., LTD
ITEM CODE SR. NO.
0 REV. :
0
1
1 OVERSPEED SHUTDOWN SYSTEM (12.3) 2
FURNISHED BY
3
MANUFACTURER
4
ELECTRONIC SET POINT
5
NUMBER OF SPEED PICKUPS
HTC
MODEL
WOODWARD
PROTECH GII
6
2 OUT OF 3 VOTING LOGIC (12.3.2.1)
7
OTHER
8
ENERGIZE TO TRIP
CONTACTS SHALL BE:
NORMALLY OPEN
NORMALLY CLOSED
(rpm)
4513
OVERSPEED SHUTDOWN REQUIREMENTS
3
SOLENOID SHALL:
DE-ENERGIZE TO TRIP
VOLTAGE LEVEL:
Vendor to provide extra one speed pickup sensor as spares
(loose supply)
9 10 GLAND SEALING AND VACUUM SYSTEM (15.6) 11 SYSTEM PER:
ANNEX G.1
12
OTHER
ANNEX G.2
VACUUM SYSTEM FURNISHED BY SHIP LOOSE
13 AVAIL. HEADER PRESSURE
(BAR)
40(38~42)
14 ● AVAILABLE SEAL STEAM SUPPLY PRESSURE 15 ● AVAILABLE SEAL STEAM SUPPLY TEMPERATURE 16 SEAL STEAM PR.
(BARG)
400(390~410)
(0C)
FLOW
(BARA)
1.08
(0C)
TEMP.
18 ● FURNISHED BY
HTC SKID MOUNTED
OTHER GLAND CONDENSER, SEE SPECIFICATION STEAM EJECTOR
■ STEAM PRESSURE
40(38~42)
(BARG)
■ STEAM FLOW
(kg/h)
17 SEALING STEAM RELIEF VALVE SET PRESSURE
(kg/h)
VACUUM PUMP (15.6.2), SEE SPECIFICATION
(BAR)
CONDENSATE RECEIVER
HTC
LOOP SEAL HEIGHT
19 FLOW ADJUSTING VALVES, TYPE
(m)
20 FURNISHED BY 21
INSPECTION AND TESTING (16.2) (16.3)
22 GENERAL 23
MECHANICAL RUNNING TEST (16.3.3)
SHOP INSPECTION (16.1.5)
OBS
WIT
CONTRACT ROTOR
25 REFERENCE INSPECTION CHECKLIST (ANNEX. I) (16.1.7)
SPARE ROTOR
26
TEST W/JOB COUPLING
27 INSPECTION AND MATERIAL TESTING
TEST TAPE RECORD REQUIRED
28
TEST TAPE GIVEN TO PURCHASER
29 SPECIAL MATERIAL INSPECTION AND TESTING REQUIREMENTS (16.2.2)
TEST W/JOB LUBE OIL CONSOLE
24
EXTENT:
30 COMPONENT
BU-01_05-D-000-MA-SPF-107 Para 3.3.2
MAG PART
DYE PEN
R.T.
U.T.
31 TRIP & T & T
OBS
WIT
32 VALVE
33 STM CHEST
OBS
WIT
34 CASING
PERFORMANCE (16.3.4.2)
35 PIPING
COMPLETE UNIT (16.3.4.3)
36 ROTOR
37
OPTIONAL TESTS (16.3.4)
38
HEAT STABILITY (16.2.2)
39
CLEANLINESS (16.2.3.3)
TRIP/TRIP AND THROTTLE VALVE
40
HARDNESS (16.2.3.4)
GLAND SEAL SYSTEM
41
HYDRO TESTS (16.3.2)
GLAND VACUUM SYSTEM
RELIEF VALVES
42 BLADE SHAKER (STATIC)
AUXILIARY EQUIPMENT (16.3.4.4)
43 ROTOR BALANCE
STANDARD (9.6.1) (9.6.2)
44
HIGH SPEED (9.6.3)
CASING INTERNAL INSPECTION (16.3.4.5)
45
LOW SPEED PRIOR TO HIGH SPEED (9.6.6)
COUPLING TO SHAFT FIT (16.3.4.8)
LOW SPEED RESIDUAL UNBALANCE CHECK (9.6.7)
TURNING GEAR
OVERSPEED SHUTDOWN SYSTEM (16.3.4.6)
48 CRATING INSPECTION (16.4.1)
GOVERNOR RESPONSE (16.3.4.10)
49 SPARE ROTOR FIT
SOUND (16.3.4.11)
SPARE PARTS TEST (16.3.4.7)
OVER SPEED TRIP
46 47
FINAL SURFACE INSPECTION (16.4.3)
CASING JOINT LEAK TEST (16.3.2.3) 51 52 53 54 55
(5) Tests are required, please mark up.
SPECIAL-PURPOSE STEAM TURBINE DATA SHEET SI UNITS
1
MANUFACTURER'S STANDARD
4
OTHER
BU-01-05-D-000-PI-SPF-009
5 6 UNIT NAMEPLATE UNITS (6.2.6)
U.S. CUSTOMARY
SI
7 SHIPMENT (16.4.1) (16.4.3.j)
EXPORT
8 DOMESTIC
EXPORT BOXING REQUIRED
OUTDOOR STORAGE OVER 12 MONTHS
10
WATERPROOF BOXING REQUIRED
11
SPARE ROTOR ASSEMBLY PACKAGED FOR: HORIZONTAL STORAGE
MAXIMUM FOR MAINTENANCE (IDENTIFY)
~15000
(kg) (kg)
MISCELLANEOUS
(kg)
TOTAL SHIPPING MASS
(kg)
VENDOR DRAWING AND DATA REQUIREMENTS (17)
ANNEXURE J
(mm)
OTHER
16 OTHER:
L
(mm)
H
(mm)
17 OTHER:
L
(mm)
H
(mm)
18 REMARKS AND ADDITIONAL REQUIREMENTS:
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55
(kg)
TRIP/TRIP & THROTTLE VALVE
H
29
1
(kg)
(mm)
28
REV. :
(kg)
L
27
0
~15000
15 CONTROL PANEL:
26
Busher Petrochemical Company 0
TURBINE UPPER HALF CASING
(mm)
25
PAGE 12 OF 12
~4470
H
24
002
~45000
(mm)
23
C-1-T
ROTOR
L
22
ITEM CODE SR. NO.
TURBINE
14 COMPLETE UNIT:
21
CLIENT :
VERTICAL STORAGE (16.4.3.j)
13 SPACE REQUIREMENTS:
20
DSH
WEIGHTS
3
19
DOC TYPE
330
MISCELLANEOUS
2 PAINTING
12
UNIT
Mechanical Data Sheet for Condensing Steam PROJECT TITLE : REQUISITION NO. : Turbine(05-330-C-1-T)
HANGZHOU STEAM TURBINE CO., LTD
9
JOB NO.