GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
A
11 kV POWER CABLES
1
P-420-GS-9002A-01/02
420-GS-9002A
Steam Turbine Generator-A
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
3
F
11,000
VAC
6,500
2
P-420-GS-9002B-01/02
420-GS-9002B
Steam Turbine Generator-B
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
3
F
11,000
VAC
6,500
3
P-420-V-9002
420-V-9002
Essential Power Generator
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
3
F
11,000
VAC
3,000
4
P-420-TRF-0001A-01/02/03
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
420-TRF-0001A
11 / 6.6 kV Transformer A Substation-1 (Power Generation)
3
F
11,000
VAC
11,520
420-TRF-0001B
11 / 6.6 kV Transformer B Substation-1 (Power Generation)
3
F
11,000
VAC
11,520
5
P-420-TRF-0001B-01/02/03
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
6
P-900-SWG-0001
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
900-SWG-0001
11 kV Switchgear Infrastructure
3
F
11,000
VAC
2,223
7
P-900-TRF-0001
800-SWG-0001
11 kV Switchgear Infrastructure
900-TRF-0001
11 / 0.42 kV Transformer Infrastructure
3
F
11,000
VAC
2,400
1 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
211-SWG-0001
11 kV Switchgear Central Well Pad Substation
3
F
11,000
VAC
389
Volt
kW
8
P-211-SWG-0001
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
9
P-211-TRF-0001
211-SWG-0001
11 kV Switchgear Central Well Pad Substation
211-TRF-0001
11 / 0.42 kV Central Wellpad Transformer
3
F
11,000
VAC
384
10
P-211-SWG-0002
211-SWG-0001
11 kV Switchgear Central Well Pad Substation
212-SWG-0001
11 kV Switchgear East Well Pad Substation
3
F
11,000
VAC
384
11
P-212-SWG-0001
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
212-SWG-0001
11 kV Switchgear East Well Pad Substation
3
F
11,000
VAC
389
12
P-212-TRF-0001
212-SWG-0001
11 kV Switchgear East Well Pad Substation
212-TRF-0001
11 / 0.42 kV East Wellpad Transformer
3
F
11,000
VAC
384
13
P-710-SWG-0001
SWG823081 (PB-01S)
11 kV Switchgear Banyu Urip Main Gate House Area
710-SWG-0001
11 kV Switchgear Sales Gas Metering Substation
3
F
11,000
VAC
166
14
P-710-TRF-0001
710-SWG-0001
11 kV Switchgear Sales Gas Metering Substation
710-TRF-0001
11 / 0.42 kV Transformer Sales Gas Metering
3
F
11,000
VAC
120
2 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
B
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
6.6 kV POWER CABLES Substation-1 (Area 420 - Power Generation Substation)
1
P-420-TRF-0002A
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
420-TRF-0002A
6.6/0.4 kV Main Transformer
3
F
6,600
VAC
1,200
2
P-420-TRF-0002B
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
420-TRF-0002B
6.6/0.4 kV Main Transformer
3
F
6,600
VAC
1,200
3
P-420-TRF-0003A
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
420-TRF-0003A
6.6/0.4 kV Essential Transformer
3
F
6,600
VAC
1,536
4
P-420-TRF-0003B
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
420-TRF-0003B
6.6/0.4 kV Essential Transformer
3
F
6,600
VAC
1,536
Substation-2 (Area 231 - Train-A Substation) 5
P-231-SWG/MCC-0001A01/02
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
231-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-2 (Train-A)
3
F
6,600
VAC
4,840
6
P-231-SWG/MCC-0001B01/02
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
231-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-2 (Train-A)
3
F
6,600
VAC
4,840
3 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
7
P-231-TRF-0001A
231-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 2A Substation-2 (Train-A)
231-TRF-0001A
6.6/0.4 kV Transformer 1A Substation-2 (Train-A)
3
F
6,600
VAC
960
8
P-231-TRF-0001B
231-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 2B Substation-2 (Train-A)
231-TRF-0001B
6.6/0.4 kV Transformer 1B Substation-2 (Train-A)
3
F
6,600
VAC
960
9
P-231-TRF-0002A-01/02
231-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 2A Substation-2 (Train-A)
231-TRF-0002A
6.6/0.4 kV Transformer 2A Substation-2 (Train-A)
3
F
6,600
VAC
3,840
10
P-231-TRF-0002B-01/02
231-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 2B Substation-2 (Train-A)
231-TRF-0002B
6.6/0.4 kV Transformer 2B Substation-2 (Train-A)
3
F
6,600
VAC
3,840
Substation-3 (Area 280 - Train-B Substation) 11
P-280-SWG/MCC-0001A01/02
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
280-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-3 (Train-B)
3
F
6,600
VAC
3,842
12
P-280-SWG/MCC-0001B01/02
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
280-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-3 (Train-B)
3
F
6,600
VAC
3,842
13
P-280-TRF-0001A-01/02
280-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 2A Substation-3
280-TRF-0001A
6.6/0.4 kV Transformer A Substation3 (Train-B)
3
F
6,600
VAC
3,456
14
P-280-TRF-0001B-01/02
280-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 2B Substation-3
280-TRF-0001B
6.6/0.4 kV Transformer B Substation3 (Train-B)
3
F
6,600
VAC
3,456
4 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
Substation-4 (Area 480 - Utility Substation) 15
P-480-SWG/MCC-0001 A
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
480-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 2A Substation-4 (Utility)
3
F
6,600
VAC
1,798
16
P-480-SWG/MCC-0001 B
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
480-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 2B Substation-4 (Utility)
3
F
6,600
VAC
1,798
17
P-480-TRF-0001A
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
480-TRF-0001A
6.6/0.4 kV Transformer Substation-4 (Utility)
3
F
6,600
VAC
768
18
P-480-TRF-0001B
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
480-TRF-0001B
6.6/0.4 kV Transformer Substation-4 (Utility)
3
F
6,600
VAC
768
Acid Gas Enrichment (AGE) Unit - Train A 19
P-280A-P-5001 A
231-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-2 (Train-A)
280A-P-5001A
Lean Amine Pump-A (Train A)
3
M
6,600
VAC
200.00
20
P-280A-P-5001 B
231-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-2 (Train-A)
280A-P-5001B
Lean Amine Pump-B (Train A)
3
M
6,600
VAC
200.00
Acid Gas Enrichment (AGE) Unit - Train B
5 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
21
P-280B-P-3001 A
280-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-3 (Train-B)
280B-P-3001A
Lean Amine Pump-A (Train B)
3
M
6,600
VAC
200.00
22
P-280B-P-3001 B
280-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-3 (Train-B)
280B-P-3001B
Lean Amine Pump-B (Train B)
3
M
6,600
VAC
200.00
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
410-P-9011
HP BWF Start-Up Pump
3
M
6,600
VAC
300.00
Boiler Feed Water (BFW) 23
P-410-P-9011
Instrument Air / Nitrogen Package 24
P-440-V-9001 A
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
440-V-9001 A
Instrument Air Compressor Package Motor A
3
M
6,600
VAC
355.00
25
P-440-V-9001 B
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
440-V-9001 B
Instrument Air Compressor Package Motor B
3
M
6,600
VAC
355.00
26
P-440-V-9001 C
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
440-V-9001 C
Instrument Air Compressor Package Motor C
3
M
6,600
VAC
355.00
6 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
C
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
0.4 kV POWER CABLES Inlet Separation Unit
1
P-221-E-9001-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-1
Inlet Cooler Fan 1
3
M
400
VAC
15.00
2
P-221-E-9001-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-2
Inlet Cooler Fan 2
3
M
400
VAC
15.00
3
P-221-E-9001-3
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-3
Inlet Cooler Fan 3
3
M
400
VAC
15.00
4
P-221-E-9001-4
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-4
Inlet Cooler Fan 4
3
M
400
VAC
15.00
5
P-221-E-9001-5
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-5
Inlet Cooler Fan 5
3
M
400
VAC
15.00
6
P-221-E-9001-6
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-6
Inlet Cooler Fan 6
3
M
400
VAC
15.00
7
P-221-E-9001-7
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-7
Inlet Cooler Fan 7
3
M
400
VAC
15.00
7 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
8
P-221-E-9001-8
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-8
Inlet Cooler Fan 8
3
M
400
VAC
15.00
Volt
kW
Produced Water Storage 9
P-222-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9001 A
Produced Water Transfer Pump A
3
M
400
VAC
5.50
10
P-222-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9001 B
Produced Water Transfer Pump B
3
M
400
VAC
5.50
11
P-222-P-9002 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9002 A
Pipeline Produced Water Transfer Pump A
3
M
400
VAC
75.00
12
P-222-P-9002 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9002 B
Pipeline Produced Water Transfer Pump B
3
M
400
VAC
75.00
13
P-222-P-9003
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9003
Skim Oil Pump
3
M
400
VAC
0.37
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
223-P-9001 A
Pipeline Condensate Transfer Pump A
3
M
400
VAC
37.00
Condensate Storage 14
P-223-P-9001 A
8 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
15
P-223-P-9001 B
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
223-P-9001 B
Pipeline Condensate Transfer Pump B
3
M
400
VAC
37.00
Volt
kW
Vapor Recovery Unit (VRU) 16
P-224-E-9001-1 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9001-1 A
VRU Intercooler-A (1st Stage) Fan-1
3
M
400
VAC
4.00
17
P-224-E-9001-2 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9001-2 A
VRU Intercooler-A (1st Stage) Fan-2
3
M
400
VAC
4.00
18
P-224-E-9001-1 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9001-1 B
VRU Intercooler-B (1st Stage) Fan-1
3
M
400
VAC
4.00
19
P-224-E-9001-2 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9001-2 B
VRU Intercooler-B (1st Stage) Fan-2
3
M
400
VAC
4.00
20
P-224-E-9002 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9002 A
VRU Intercooler-A (2nd Stage) Fan-1
3
M
400
VAC
1.50
21
P-224-E-9002 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9002 B
VRU Intercooler-B (2nd Stage) Fan-1
3
M
400
VAC
1.50
22
P-224-E-9003 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9003 A
VRU Intercooler-A (3rd Stage) Fan-1
3
M
400
VAC
2.20
9 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
23
P-224-E-9003 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9003 B
VRU Intercooler-B (3rd Stage) Fan-1
3
M
400
VAC
2.20
24
P-224-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-P-9001 A
VRU Knockout Pump A
3
M
400
VAC
0.37
25
P-224-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-P-9001 B
VRU Knockout Pump B
3
M
400
VAC
0.37
26
P-224-C-9001-01/02
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-C-9001
Driver Motor for VRU Compressor
3
M
400
VAC
160.00
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
231-P-9001
Methanol Injection Pump
3
M
400
VAC
3.00
Dew Point Control 27
P-231-P-9001
Condensate Stabilization 28
P-232-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-P-9001 A
Condensate Reflux Pump A
3
M
400
VAC
7.50
29
P-232-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-P-9001 B
Condensate Reflux Pump B
3
M
400
VAC
7.50
10 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
30
P-232-E-9001-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-E-9001-1
Condensate Cooler Fan-1
3
M
400
VAC
4.00
31
P-232-E-9001-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-E-9001-2
Condensate Cooler Fan-2
3
M
400
VAC
4.00
32
P-232-P-9002
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-P-9002
Condensate Stabilizer Recycle Liquid Pump
3
M
400
VAC
7.50
33
P-232-E-9003-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-E-9003-1
Recycle Gas Compressor Cooler Fan-1
3
M
400
VAC
3.00
34
P-232-E-9003-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-E-9003-2
Recycle Gas Compressor Cooler Fan-2
3
M
400
VAC
3.00
Ethylene Glycol (EG) Regeneration 35
P-233-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9001 A
EG Circulator Pump A
3
M
400
VAC
18.50
36
P-233-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9001 B
EG Circulator Pump B
3
M
400
VAC
18.50
37
P-233-P-9002 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9002 A
EG Reflux Pump A
3
M
400
VAC
0.37
11 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
38
P-233-P-9002 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9002 B
EG Reflux Pump B
3
M
400
VAC
0.37
39
P-233-P-9003 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9003 A
Produced Water Booster Pump A
3
M
400
VAC
0.75
40
P-233-P-9003 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9003 B
Produced Water Booster Pump B
3
M
400
VAC
0.75
41
P-233-P-9004
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9004
EG Makeup Pump
3
M
400
VAC
18.50
42
P-233-C-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-C-9001 A
EG Regeneration Overhead Gas Compressor A
3
M
400
VAC
75.00
43
P-233-C-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-C-9001 B
EG Regeneration Overhead Gas Compressor B
3
M
400
VAC
75.00
44
P-233-E-9005-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-E-9005-1
EG Regeneration Tower Cooler Fan-1
3
M
400
VAC
2.20
45
P-233-E-9005-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-E-9005-2
EG Regeneration Tower Cooler Fan-2
3
M
400
VAC
2.20
46
P-233-P-9005
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9005
Glycol Drain Return Pump
3
M
400
VAC
0.75
12 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
Propylene - Refrigeration Unit 47
P-234-E-9001-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-1
Propylene Condenser Fan 1
3
M
400
VAC
7.50
48
P-234-E-9001-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-2
Propylene Condenser Fan 2
3
M
400
VAC
7.50
49
P-234-E-9001-3
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-3
Propylene Condenser Fan 3
3
M
400
VAC
7.50
50
P-234-E-9001-4
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-4
Propylene Condenser Fan 4
3
M
400
VAC
7.50
51
P-234-E-9001-5
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-5
Propylene Condenser Fan 5
3
M
400
VAC
7.50
52
P-234-E-9001-6
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-6
Propylene Condenser Fan 6
3
M
400
VAC
7.50
53
P-234-E-9001-7
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-6
Propylene Condenser Fan 7
3
M
400
VAC
7.50
54
P-234-E-9001-8
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-6
Propylene Condenser Fan 8
3
M
400
VAC
7.50
13 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
55
P-234-CA-9001-1 A
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
234-CA-9001-1 A
Propylene Compressor A (1st Stage) Auxiliary Load
3
M
400
VAC
45.00
56
P-234-CA-9001-2 A
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
234-CA-9001-2 A
Propylene Compressor A (2nd Stage) Auxiliary Load
3
M
400
VAC
45.00
57
P-234-CA-9001-1 B
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
234-CA-9001-1 B
Propylene Compressor B (1st Stage) Auxiliary Load
3
M
400
VAC
45.00
58
P-234-CA-9001-2 B
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
234-CA-9001-2 B
Propylene Compressor B (2nd Stage) Auxiliary Load
3
M
400
VAC
45.00
AGRU-A 59
P-240A-E-1001-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-1
Lean Solvent Air Cooler-A (AGRU A) #1
3
M
400
VAC
55.00
60
P-240A-E-1001-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-2
Lean Solvent Air Cooler-A (AGRU A) #2
3
M
400
VAC
55.00
61
P-240A-E-1001-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-3
Lean Solvent Air Cooler-A (AGRU A) #3
3
M
400
VAC
55.00
62
P-240A-E-1001-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-4
Lean Solvent Air Cooler-A (AGRU A) #4
3
M
400
VAC
55.00
14 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
63
P-240A-E-1001-5
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-5
Lean Solvent Air Cooler-A (AGRU A) #5
3
M
400
VAC
55.00
64
P-240A-E-1001-6
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-6
Lean Solvent Air Cooler-A (AGRU A) #6
3
M
400
VAC
55.00
65
P-240A-E-1001-7
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-7
Lean Solvent Air Cooler-A (AGRU A) #7
3
M
400
VAC
55.00
66
P-240A-E-1001-8
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-8
Lean Solvent Air Cooler-A (AGRU A) #8
3
M
400
VAC
55.00
67
P-240A-E-2001-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-1
Lean Solvent Air Cooler-B (AGRU A) #1
3
M
400
VAC
55.00
68
P-240A-E-2001-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-2
Lean Solvent Air Cooler-B (AGRU A) #2
3
M
400
VAC
55.00
69
P-240A-E-2001-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-3
Lean Solvent Air Cooler-B (AGRU A) #3
3
M
400
VAC
55.00
70
P-240A-E-2001-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-4
Lean Solvent Air Cooler-B (AGRU A) #4
3
M
400
VAC
55.00
71
P-240A-E-2001-5
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-5
Lean Solvent Air Cooler-B (AGRU A) #5
3
M
400
VAC
55.00
15 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
72
P-240A-E-2001-6
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-6
Lean Solvent Air Cooler-B (AGRU A) #6
3
M
400
VAC
55.00
73
P-240A-E-2001-7
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-7
Lean Solvent Air Cooler-B (AGRU A) #7
3
M
400
VAC
55.00
74
P-240A-E-2001-8
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-8
Lean Solvent Air Cooler-B (AGRU A) #8
3
M
400
VAC
55.00
75
P-240A-PA-1002
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-1002
Auxiliary for HP Lean Solvent Pump 1 (Train A)
3
M
400
VAC
22.00
76
P-240A-PA-2002
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-2002
Auxiliary for HP Lean Solvent Pump 2 (Train A)
3
M
400
VAC
22.00
77
P-240A-PA-5003
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-5003
Auxiliary for HP Lean Solvent Pump 3 (Train A)
3
M
400
VAC
22.00
78
P-240A-P-1003 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-1003A
Reflux Pump-1 A (Train A)
3
M
400
VAC
11.00
79
P-240A-P-1003 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-1003B
Reflux Pump-1 B (Train A)
3
M
400
VAC
11.00
80
P-240A-P-2003 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-2003A
Reflux Pump-2 A (Train A)
3
M
400
VAC
11.00
16 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
81
P-240A-P-2003 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-2003B
Reflux Pump-2 B (Train A)
3
M
400
VAC
11.00
82
P-240A-P-5001
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-5001
Drained Solvent Pump (Stand-By) Train A
3
M
400
VAC
4.00
83
P-240A-P-5002
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-5002
Drained Hydrocarbon Pump (StandBy) Train A
3
M
400
VAC
2.20
84
P-240A-PA-1012
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-1012
Auxiliary for LP Lean Solvent Pump 1 (Train A)
3
M
400
VAC
4.00
85
P-240A-PA-2012
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-2012
Auxiliary for LP Lean Solvent Pump 2 (Train A)
3
M
400
VAC
4.00
86
P-240A-PA-5012
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-5012
Auxiliary for LP Lean Solvent Pump 3 (Train A)
3
M
400
VAC
4.00
87
P-240A-PA-1001
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-1001
Auxiliary for Regenerator Lean Solvent Pump 1 (Train A)
3
M
400
VAC
5.50
88
P-240A-PA-2001
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-2001
Auxiliary for Regenerator Lean Solvent Pump 2 (Train A)
3
M
400
VAC
5.50
89
P-240A-PA-5004
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-5004
Auxiliary for Regenerator Lean Solvent Pump 3 (Train A)
3
M
400
VAC
5.50
17 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
90
P-240A-P-1006 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-1006 A
Reboiler Condensate Pump-1A (Train A)
3
M
400
VAC
15.00
91
P-240A-P-1006 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-1006 B
Reboiler Condensate Pump-1B (Train A)
3
M
400
VAC
15.00
92
P-240A-P-2006 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-2006 A
Reboiler Condensate Pump-2A (Train A)
3
M
400
VAC
15.00
93
P-240A-P-2006 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-2006 B
Reboiler Condensate Pump-2B (Train A)
3
M
400
VAC
15.00
94
P-240A-E-1004-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1004-1
Overhead Condenser-A (AGRU A) #1
3
M
400
VAC
55.00
95
P-240A-E-1004-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1004-2
Overhead Condenser-A (AGRU A) #2
3
M
400
VAC
55.00
96
P-240A-E-1004-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1004-3
Overhead Condenser-A (AGRU A) #3
3
M
400
VAC
55.00
97
P-240A-E-1004-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1004-4
Overhead Condenser-A (AGRU A) #4
3
M
400
VAC
55.00
98
P-240A-E-2004-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2004-1
Overhead Condenser-B (AGRU A) #1
3
M
400
VAC
55.00
18 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
P-240A-E-2004-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2004-2
Overhead Condenser-B (AGRU A) #2
3
M
400
VAC
55.00
100 P-240A-E-2004-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2004-3
Overhead Condenser-B (AGRU A) #3
3
M
400
VAC
55.00
101 P-240A-E-2004-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2004-4
Overhead Condenser-B (AGRU A) #4
3
M
400
VAC
55.00
102 P-240-P-9001 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240-P-9001A
AGRU Fresh Solvent Pump A
3
M
400
VAC
5.50
103 P-240-P-9001 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240-P-9001B
AGRU Fresh Solvent Pump B
3
M
400
VAC
5.50
104 P-240B-E-3001-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-1
Lean Solvent Air Cooler-A (AGRU B) #1
3
M
400
VAC
55.00
105 P-240B-E-3001-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-2
Lean Solvent Air Cooler-A (AGRU B) #2
3
M
400
VAC
55.00
106 P-240B-E-3001-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-3
Lean Solvent Air Cooler-A (AGRU B) #3
3
M
400
VAC
55.00
99
Volt
kW
AGRU-B
19 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
107 P-240B-E-3001-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-4
Lean Solvent Air Cooler-A (AGRU B) #4
3
M
400
VAC
55.00
108 P-240B-E-3001-5
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-5
Lean Solvent Air Cooler-A (AGRU B) #5
3
M
400
VAC
55.00
109 P-240B-E-3001-6
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-6
Lean Solvent Air Cooler-A (AGRU B) #6
3
M
400
VAC
55.00
110 P-240B-E-3001-7
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-7
Lean Solvent Air Cooler-A (AGRU B) #7
3
M
400
VAC
55.00
111 P-240B-E-3001-8
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-8
Lean Solvent Air Cooler-A (AGRU B) #8
3
M
400
VAC
55.00
112 P-240B-E-4001-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-1
Lean Solvent Air Cooler-B (AGRU B) #1
3
M
400
VAC
55.00
113 P-240B-E-4001-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-2
Lean Solvent Air Cooler-B (AGRU B) #2
3
M
400
VAC
55.00
114 P-240B-E-4001-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-3
Lean Solvent Air Cooler-B (AGRU B) #3
3
M
400
VAC
55.00
115 P-240B-E-4001-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-4
Lean Solvent Air Cooler-B (AGRU B) #4
3
M
400
VAC
55.00
20 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
116 P-240B-E-4001-5
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-5
Lean Solvent Air Cooler-B (AGRU B) #5
3
M
400
VAC
55.00
117 P-240B-E-4001-6
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-6
Lean Solvent Air Cooler-B (AGRU B) #6
3
M
400
VAC
55.00
118 P-240B-E-4001-7
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-7
Lean Solvent Air Cooler-B (AGRU B) #7
3
M
400
VAC
55.00
119 P-240B-E-4001-8
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-8
Lean Solvent Air Cooler-B (AGRU B) #8
3
M
400
VAC
55.00
120 P-240B-PA-3002
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-3002
Auxiliary for HP Lean Solvent Pump 1 (Train B)
3
M
400
VAC
22.00
121 P-240B-PA-4002
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-4002
Auxiliary for HP Lean Solvent Pump 2 (Train B)
3
M
400
VAC
22.00
122 P-240B-PA-6003
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-6003
Auxiliary for HP Lean Solvent Pump 3 (Train B)
3
M
400
VAC
22.00
123 P-240B-P-3003 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-3003A
Reflux Pump-1 A (Train B)
3
M
400
VAC
11.00
124 P-240B-P-3003 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-3003 B
Reflux Pump-1 B (Train B)
3
M
400
VAC
11.00
21 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
125 P-240B-P-4003 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-4003A
Reflux Pump-2 A (Train B)
3
M
400
VAC
11.00
126 P-240B-P-4003 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-4003 B
Reflux Pump-2 B (Train B)
3
M
400
VAC
11.00
127 P-240B-P-6001
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-6001
Drained Solvent Pump (Stand-By) Train B
3
M
400
VAC
4.00
128 P-240B-P-6002
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-6002
Drained Hydrocarbon Pump (StandBy) Train B
3
M
400
VAC
2.20
127 P-240B-PA-3012
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-3012
Auxiliary for LP Lean Solvent Pump 1 (Train B)
3
M
400
VAC
4.00
128 P-240B-PA-4012
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-4012
Auxiliary for LP Lean Solvent Pump 2 (Train B)
3
M
400
VAC
4.00
129 P-240B-PA-6012
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-6012
Auxiliary for LP Lean Solvent Pump 3 (Train B)
3
M
400
VAC
4.00
130 P-240B-PA-3001
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-3001
Auxiliary for Regenerator Lean Solvent Pump 1 (Train B)
3
M
400
VAC
5.50
131 P-240B-PA-4001
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-4001
Auxiliary for Regenerator Lean Solvent Pump 2 (Train B)
3
M
400
VAC
5.50
22 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
132 P-240B-PA-6004
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-6004
Auxiliary for Regenerator Lean Solvent Pump 3 (Train B)
3
M
400
VAC
5.50
133 P-240B-P-3006 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-3006 A
Reboiler Condensate Pump-1 A (Train B)
3
M
400
VAC
15.00
134 P-240B-P-3006 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-3006 B
Reboiler Condensate Pump-1 B (Train B)
3
M
400
VAC
15.00
135 P-240B-P-4006 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-4006 A
Reboiler Condensate Pump-2 A (Train B)
3
M
400
VAC
15.00
136 P-240B-P-4006 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-4006 B
Reboiler Condensate Pump-2 B (Train B)
3
M
400
VAC
15.00
137 P-240B-E-3004-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3004-1
Overhead Condenser-A (AGRU B) #1
3
M
400
VAC
55.00
138 P-240B-E-3004-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3004-2
Overhead Condenser-A (AGRU B) #2
3
M
400
VAC
55.00
139 P-240B-E-3004-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3004-3
Overhead Condenser-A (AGRU B) #3
3
M
400
VAC
55.00
140 P-240B-E-3004-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3004-4
Overhead Condenser-A (AGRU B) #4
3
M
400
VAC
55.00
23 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
141 P-240B-E-4004-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4004-1
Overhead Condenser-B (AGRU B) #1
3
M
400
VAC
55.00
142 P-240B-E-4004-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4004-2
Overhead Condenser-B (AGRU B) #2
3
M
400
VAC
55.00
143 P-240B-E-4004-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4004-3
Overhead Condenser-B (AGRU B) #3
3
M
400
VAC
55.00
144 P-240B-E-4004-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4004-4
Overhead Condenser-B (AGRU B) #4
3
M
400
VAC
55.00
145 P-250-P-9001 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-P-9001 A
Sales Gas Dehy TEG Circulation Pump A
3
M
400
VAC
132.00
146 P-250-P-9001 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-P-9001 B
Sales Gas Dehy TEG Circulation Pump B
3
M
400
VAC
132.00
147 P-250-E-9001-1
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-E-9001-1
Sales Gas Dehy TEG Lean Cooler Fan-1
3
M
400
VAC
7.50
148 P-250-E-9001-2
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-E-9001-2
Sales Gas Dehy TEG Lean Cooler Fan-2
3
M
400
VAC
7.50
Volt
kW
Sales Gas Dehydration Unit
24 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
149 P-250-P-9002
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-P-9002
Sales Gas Dehy TEG Supply Pump
3
M
400
VAC
7.50
150 P-250-P-9003
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-P-9003
TEG Drain Vessel Pump
3
M
400
VAC
0.75
151 P-260-E-9001-1
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
260-E-9001-1
Sales Gas Compressor Discharge Cooler Fan 1
3
M
400
VAC
7.50
152 P-260-E-9001-2
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
260-E-9001-2
Sales Gas Compressor Discharge Cooler Fan 2
3
M
400
VAC
7.50
153 P-260-CA-9001 A
420-SWG/MCC-0004
Essential LV Switchgear/MCC Substation-1 (Power Generation)
260-CA-9001 A
Sales Gas Compressor A Auxiliary Load
3
M
400
VAC
75.00
154 P-260-CA-9001 B
420-SWG/MCC-0004
Essential LV Switchgear/MCC Substation-1 (Power Generation)
260-CA-9001 B
Sales Gas Compressor B Auxiliary Load
3
M
400
VAC
75.00
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1005
Wash Water Pump-1 at AGE Absorber (Train A)
3
M
400
VAC
7.50
Volt
kW
Sales Gas Compression
Acid Gas Enrichment (AGE) Unit - Train A 155 P-280A-P-1005
231-SWG/MCC-0004
25 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
156 P-280A-P-2005
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2005
Wash Water Pump-2 at AGE Absorber (Train A)
3
M
400
VAC
7.50
157 P-280A-P-5005
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5005
Wash Water Pump-3 at AGE Absorber (Train A)
3
M
400
VAC
7.50
158 P-280A-P-1004
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1004
Regenerator Reflux Pump-1 (Train A)
3
M
400
VAC
15.00
159 P-280A-P-2004
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2004
Regenerator Reflux Pump-2 (Train A)
3
M
400
VAC
15.00
160 P-280A-P-5004
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5004
Regenerator Reflux Pump-3 (Train A)
3
M
400
VAC
15.00
161 P-280A-P-5002 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5002A
Solvent Sump Pump-A (Train A)
3
M
400
VAC
11.00
162 P-280A-P-5002 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5002B
Solvent Sump Pump-B (Train A)
3
M
400
VAC
11.00
163 P-280A-E-1002
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-1002
Regenerator Overhead Condenser 1 (Train A)
3
M
400
VAC
37.00
164 P-280A-E-2002
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-2002
Regenerator Overhead Condenser 2 (Train A)
3
M
400
VAC
37.00
26 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
165 P-280A-P-1008
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1008
Regenerator Bottoms Pump 1 (Train A)
3
M
400
VAC
75.00
166 P-280A-P-2008
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2008
Regenerator Bottoms Pump 2 (Train A)
3
M
400
VAC
75.00
167 P-280A-P-5008
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5008
Regenerator Bottoms Pump 3 (Train A)
3
M
400
VAC
75.00
168 P-280A-E-5001-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-1
Lean Amine Cooler (Train A) #1
3
M
400
VAC
37.00
169 P-280A-E-5001-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-2
Lean Amine Cooler (Train A) #2
3
M
400
VAC
37.00
170 P-280A-E-5001-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-3
Lean Amine Cooler (Train A) #3
3
M
400
VAC
37.00
171 P-280A-E-5001-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-4
Lean Amine Cooler (Train A) #4
3
M
400
VAC
37.00
172 P-280A-E-5001-5
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-5
Lean Amine Cooler (Train A) #5
3
M
400
VAC
37.00
173 P-280A-E-5001-6
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-6
Lean Amine Cooler (Train A) #6
3
M
400
VAC
37.00
27 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
174 P-280A-E-5001-7
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-7
Lean Amine Cooler (Train A) #7
3
M
400
VAC
37.00
175 P-280A-E-5001-8
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-8
Lean Amine Cooler (Train A) #8
3
M
400
VAC
37.00
176 P-280A-P-1003
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1003
Rich Amine Pump-1 at AGE Absorber (Train A)
3
M
400
VAC
110.00
177 P-280A-P-2003
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2003
Rich Amine Pump-2 at AGE Absorber (Train A)
3
M
400
VAC
110.00
178 P-280A-P-5003
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5003
Rich Amine Pump-3 at AGE Absorber (Train A)
3
M
400
VAC
110.00
179 P-280-P-9001 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280-P-9001A
Fresh Solvent Pump A (Train A)
3
M
400
VAC
5.50
180 P-280-P-9001 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280-P-9001B
Fresh Solvent Pump B (Train A)
3
M
400
VAC
5.50
181 P-280A-P-1006
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1006
Sour Water Pump-1 (Train A)
3
M
400
VAC
5.50
182 P-280A-P-2006
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2006
Sour Water Pump-2 (Train A)
3
M
400
VAC
5.50
28 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
183 P-280A-P-5006
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5006
Sour Water Pump-3 (Train A)
3
M
400
VAC
5.50
Volt
kW
Acid Gas Enrichment (AGE) Unit - Train B 184 P-280B-P-3005
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3005
Wash Water Pump-1 at AGE Absorber (Train B)
3
M
400
VAC
11.00
185 P-280B-P-4005
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4005
Wash Water Pump-2 at AGE Absorber (Train B)
3
M
400
VAC
11.00
186 P-280B-P-6005
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6005
Wash Water Pump-3 at AGE Absorber (Train B)
3
M
400
VAC
11.00
187 P-280B-P-3004
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3004
Regenerator Reflux Pump-1 (Train B)
3
M
400
VAC
15.00
188 P-280B-P-4004
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4004
Regenerator Reflux Pump-2 (Train B)
3
M
400
VAC
15.00
189 P-280B-P-6004
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6004
Regenerator Reflux Pump-3 (Train B)
3
M
400
VAC
15.00
190 P-280B-P-6002 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6002A
Solvent Sump Pump-A (Train B)
3
M
400
VAC
11.00
29 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
191 P-280B-P-6002 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6002B
Solvent Sump Pump-B (Train B)
3
M
400
VAC
11.00
192 P-280B-E-3002
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-3002
Regenerator Overhead Condenser 1 (Train B)
3
M
400
VAC
37.00
193 P-280B-E-4002
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-4002
Regenerator Overhead Condenser 2 (Train B)
3
M
400
VAC
37.00
194 P-280B-P-3008
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3008
Regenerator Bottoms Pump-1 (Train B)
3
M
400
VAC
75.00
195 P-280B-P-4008
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4008
Regenerator Bottoms Pump-2 (Train B)
3
M
400
VAC
75.00
196 P-280B-P-6008
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6008
Regenerator Bottoms Pump-3 (Train B)
3
M
400
VAC
75.00
197 P-280B-E-6001-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-1
Lean Amine Cooler (Train B) #1
3
M
400
VAC
37.00
198 P-280B-E-6001-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-2
Lean Amine Cooler (Train B) #2
3
M
400
VAC
37.00
199 P-280B-E-6001-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-3
Lean Amine Cooler (Train B) #3
3
M
400
VAC
37.00
30 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
200 P-280B-E-6001-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-4
Lean Amine Cooler (Train B) #4
3
M
400
VAC
37.00
201 P-280B-E-6001-5
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-5
Lean Amine Cooler (Train B) #5
3
M
400
VAC
37.00
202 P-280B-E-6001-6
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-6
Lean Amine Cooler (Train B) #6
3
M
400
VAC
37.00
203 P-280B-E-6001-7
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-7
Lean Amine Cooler (Train B) #7
3
M
400
VAC
37.00
204 P-280B-E-6001-8
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-8
Lean Amine Cooler (Train B) #8
3
M
400
VAC
37.00
205 P-280B-P-3003-01/02
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3003
Rich Amine Pump-A at AGE Absorber (Train B)
3
M
400
VAC
110.00
206 P-280B-P-4003-01/02
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4003
Rich Amine Pump-B at AGE Absorber (Train B)
3
M
400
VAC
110.00
207 P-280B-P-6003-01/02
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6003
Rich Amine Pump-C at AGE Absorber (Train B)
3
M
400
VAC
110.00
208 P-280B-P-3006
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3006
Sour Water Pump-A (Train B)
3
M
400
VAC
15.00
31 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
209 P-280B-P-4006
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4006
Sour Water Pump-B (Train B)
3
M
400
VAC
15.00
210 P-280B-P-6006
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6006
Sour Water Pump-C (Train B)
3
M
400
VAC
15.00
211 P-290-P-9002 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9002A
Sulfur Transfer Pump A
3
M
400
VAC
2.20
212 P-290-P-9002 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9002B
Sulfur Transfer Pump B
3
M
400
VAC
2.20
213 P-290-CA-9001 A
420-SWG/MCC-0004
Essential LV Switchgear/MCC Substation-1 (Power Generation)
290-CA-9001A
Claus Air Blower A Auxiliary Load
3
M
400
VAC
7.50
214 P-290-CA-9001 B
420-SWG/MCC-0004
Essential LV Switchgear/MCC Substation-1 (Power Generation)
290-CA-9001B
Claus Air Blower B Auxiliary Load
3
M
400
VAC
7.50
215 P-290-P-9001 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9001A
Sour Condensate Pump A
3
M
400
VAC
2.20
216 P-290-P-9001 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9001B
Sour Condensate Pump B
3
M
400
VAC
2.20
Volt
kW
Sulfur Recovery Unit
32 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
217 P-290-P-9003 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9003A
Sulfur Handling Pump A
3
M
400
VAC
11.00
218 P-290-P-9003 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9003B
Sulfur Handling Pump B
3
M
400
VAC
11.00
219 P-290-P-9011 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9011A
LP Condensate Pump A
3
M
400
VAC
11.00
220 P-290-P-9011 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9011B
LP Condensate Pump B
3
M
400
VAC
11.00
221 P-310-P-9001 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9001A
Quench Water Pump-A
3
M
400
VAC
75.00
222 P-310-P-9001 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9001B
Quench Water Pump-B
3
M
400
VAC
75.00
223 P-310-P-9002 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9002A
Wash Water Pump-A at TGU Absorber
3
M
400
VAC
11.00
224 P-310-P-9002 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9002B
Wash Water Pump-B at TGU Absorber
3
M
400
VAC
11.00
Volt
kW
Tail Gas Unit (TGU)
33 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
225 P-310-P-9003 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9003A
Rich Amine Pump-A at TGU Absorber
3
M
400
VAC
75.00
226 P-310-P-9003 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9003B
Rich Amine Pump-B at TGU Absorber
3
M
400
VAC
75.00
227 P-310-P-9004
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9004
Sour Water Drain Return Pump
3
M
400
VAC
2.20
228 P-310-E-9002-1
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-E-9002-1
Quench Water Air Cooler #1
3
M
400
VAC
30.00
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-E-9002-2
Quench Water Air Cooler #2
3
M
400
VAC
30.00
230 P-410-P-9001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9001A
BFW Transfer Pump-A
3
M
400
VAC
30.00
231 P-410-P-9001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9001B
BFW Transfer Pump-B
3
M
400
VAC
30.00
232 P-410-P-9003 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9003A
Steam Condensate Pump A
3
M
400
VAC
11.00
229 P-310-E-9002-2
Volt
kW
Boiler Feed Water (BFW)
34 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
233 P-410-P-9003 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9003B
Steam Condensate Pump B
3
M
400
VAC
11.00
234 P-410-P-9004 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9004A
Blowdown Pump A
3
M
400
VAC
18.50
235 P-410-P-9004 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9004B
Blowdown Pump B
3
M
400
VAC
18.50
236 P-410-P-9005 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9005A
LP BFW Pump A
3
M
400
VAC
37.00
237 P-410-P-9005 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9005B
LP BFW Pump B
3
M
400
VAC
37.00
238 P-410-E-9001-1
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-E-9001-1
Steam Condenser Fan-1
3
M
400
VAC
11.00
239 P-410-E-9001-2
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-E-9001-2
Steam Condenser Fan-2
3
M
400
VAC
11.00
240 P-410-TK-9002
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-TK-9002
Oxygen Scavenger Tank Mixer Motor
3
M
400
VAC
0.75
241 P-410-TK-9003
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-TK-9003
Neutralization Amine Tank Mixer Motor
3
M
400
VAC
0.75
35 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
242 P-410-TK-9004
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-TK-9004
Phosphate Solution Tank Mixer Motor
3
M
400
VAC
0.75
243 P-410-P-9008 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9008A
Oxygen Scavenger Pump Motor-A
3
M
400
VAC
0.75
244 P-410-P-9008 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9008B
Oxygen Scavenger Pump Motor-B
3
M
400
VAC
0.75
245 P-410-P-9009 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9009A
Neutralization Amine Pump Motor-A
3
M
400
VAC
1.10
246 P-410-P-9009 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9009B
Neutralization Amine Pump Motor-B
3
M
400
VAC
1.10
247 P-410-P-9010 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9010A
Phosphate Solution Pump Motor A
3
M
400
VAC
0.75
248 P-410-P-9010 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9010B
Phosphate Solution Pump Motor B
3
M
400
VAC
0.75
249 P-410-E-9002-1
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-E-9002-1
Deaerator Steam Condenser Motor 1
3
M
400
VAC
30.00
250 P-410-E-9001-2
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-E-9002-2
Deaerator Steam Condenser Motor 2
3
M
400
VAC
30.00
36 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
251 P-450-P-9004 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
450-P-9004 A
Raw Water Feed Pump A
3
M
400
VAC
45.00
252 P-450-P-9004 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
450-P-9004B
Raw Water Feed Pump B
3
M
400
VAC
45.00
253 P-460-P-9001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-P-9001A
AGE Off-Gas K.O. Drum Pump-A
3
M
400
VAC
5.50
254 P-460-P-9001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-P-9001B
AGE Off-Gas K.O. Drum Pump-B
3
M
400
VAC
5.50
255 P-460-P-9002 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-P-9002A
TGU Off-Gas K.O. Drum Pump-A
3
M
400
VAC
5.50
256 P-460-P-9002 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-P-9002B
TGU Off-Gas K.O. Drum Pump-B
3
M
400
VAC
5.50
257 P-460-EA-9001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001A
Thermal Oxidizer Air Blower A Auxiliary Load
3
M
400
VAC
11.00
Volt
kW
Water Treating
Thermal Oxidizer Unit
37 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
258 P-460-EA-9001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001B
Thermal Oxidizer Air Blower B Auxiliary Load
3
M
400
VAC
11.00
259 P-460-EA-9001 C
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001C
Thermal Oxidizer Air Blower C Auxiliary Load
3
M
400
VAC
11.00
260 P-460-EA-9001 D
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001D
Thermal Oxidizer Air Blower D Auxiliary Load
3
M
400
VAC
11.00
261 P-460-EA-9001 E
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001E
Thermal Oxidizer Air Blower E Auxiliary Load
3
M
400
VAC
11.00
262 P-470-P-9013 A-01/02
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
470-P-9013 A
HP Flare Knockout Drum Condensate Pump A
3
M
400
VAC
90.00
263 P-470-P-9013 B-01/02
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
470-P-9013 B
HP Flare Knockout Drum Condensate Pump B
3
M
400
VAC
90.00
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
475-P-9014 A
LP Flare Knockout Drum Condensate Pump A
3
M
400
VAC
75.00
Volt
kW
HP Flare System
LP Flare System 264 P-475-P-9014 A
38 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
475-P-9014 B
LP Flare Knockout Drum Condensate Pump B
3
M
400
VAC
75.00
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
480-P-9015
Diesel Pump
3
M
400
VAC
5.50
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
490-P-9008
Firewater Jockey Pump
3
M
400
VAC
18.50
268 P-510-P-9001
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
510-P-9001
Close Drain Pump
3
M
400
VAC
37.00
269 P-520-P-9001
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
520-P-9001
Open Drain Pump
3
M
400
VAC
5.50
265 P-475-P-9014 B
Volt
kW
Diesel Fuel 266 P-480-P-9015
Fire Water System 267 P-490-P-9008
Open and Close Drain System
GENERATOR DEG - Emergency Generator
39 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
420-V-9001
Emergency Generator
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
3
F
400
VAC
536
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-BCH-5001
Battery Charger Emergency Diesel Generator
3
F
400
VAC
2.20
211-V-9007
Backup Generator Well Pad Central
211-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad Central
3
F
400
VAC
240.00
211-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad Central
211-BCH-5001
Battery Charger Backup Diesel Generator Well Pad Central
3
F
400
VAC
2.20
211-TRF-0001
11 / 0.4 kV Central Well Pad Transformer
211-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad Central
3
F
400
VAC
160
212-V-9006
Backup Generator Well Pad East
212-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad East
3
F
400
VAC
240.00
212-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad East
212-BCH-5001
Battery Charger Backup Diesel Generator Well Pad East
3
F
400
VAC
2.20
270 P-420-V-9001-01/02/03
271 P-420-BCH-5001
Power
Volt
kW
Backup Generator - Well Pad Central 272 P-211-V-9007-01/02
273 P-211-BCH-5001
274 P-211-TRF-0002-01/02
Backup Generator - Well Pad East 275 P-212-V-9006-01/02/03
276 P-212-BCH-5001
40 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
212-TRF-0001
11 /0.42 kV East Well Pad Transformer
212-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad East
3
F
400
VAC
160
800-SWG/MCC-0002
400 VAC Switchgear/MCC Infrastructure
800-BCH-5001
Battery Charger Backup Diesel Generator Infrastructure
3
F
400
VAC
2.20
710-V-9003
Backup Generator Sales Gas Metering Station
710-SWG/MCC-0002
400 VAC Switchgear/MCC Sales Gas Metering Station
3
F
400
VAC
100.00
280 P-710-BCH-5001
710-SWG/MCC-0002
400 VAC Switchgear/MCC Sales Gas Metering Station
710-BCH-5001
Battery Charger Backup Diesel Generator Sales Gas Metering
3
F
400
VAC
2.20
281 P-710-TRF-0002
710-TRF-0001
11 / 0.42 kV Transformer Sales Gas Metering
410-SWG/MCC-0002
400 VAC Switchgear/MCC Sales Gas Metering Station
3
F
400
VAC
100.00
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1003
STG-A Lube Oil Clarifier Driver
3
M
400
VAC
1.50
277 P-212-TRF-0002
Volt
kW
Backup Generator - Infrastructure 278 P-800-BCH-5001
Backup Generator - Sales Gas Metering Station 279 P-710-V-9003
STG A - Main Generator A 282 P-420-P-1003
41 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
283 P-420-P-1001 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1001A
STG-A Lube Oil Pump Driver-A
3
M
400
VAC
30.00
284 P-420-P-1001 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1001B
STG-A Lube Oil Pump Driver-B
3
M
400
VAC
30.00
285 P-420-P-1002 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1002A
STG-A Lube Oil Tank Mist SeparatorA
3
M
400
VAC
4.00
286 P-420-P-1002 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1002B
STG-A Lube Oil Tank Mist SeparatorB
3
M
400
VAC
4.00
287 P-420-P-1004
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1004
STG-A Jacking Oil Oump Driver
3
M
400
VAC
1.50
288 P-420-P-1005
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1005
STG-A Bearing Gear Driver
3
M
400
VAC
4.00
289 P-420-P-2003
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2003
STG-B Lube Oil Clarifier Driver
3
M
400
VAC
1.50
290 P-420-P-2001 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2001A
STG-B Lube Oil Pump Driver-A
3
M
400
VAC
30.00
Volt
kW
STG B - Main Generator B
42 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
291 P-420-P-2001 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2001B
STG-B Lube Oil Pump Driver-B
3
M
400
VAC
30.00
292 P-420-P-2002 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2002A
STG-B Lube Oil Mist Separator-A
3
M
400
VAC
4.00
293 P-420-P-2002 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2002B
STG-B Lube Oil Mist Separator-B
3
M
400
VAC
4.00
294 P-420-P-2004
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2004
STG-B Jacking Oil Oump Driver
3
M
400
VAC
1.50
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2005
STG-B Bearing Gear Driver
3
M
400
VAC
4.00
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-E-4001
Radiator Fan Essential Generator
3
M
400
VAC
11.00
297 P-420-DPN-4001
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DPN-4001
LCP Power Essential Generator
3
F
400
VAC
18.25
298 P-420-BCH-4001
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-BCH-4001
Battery Charger Essential Generator
3
F
400
VAC
2.00
295 P-420-P-2005
Volt
kW
GEG+DEG - Essential Generator 296 P-420-E-4001
43 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
Transformer Rectifier Unit (TRU) for Cathodic Protection 299 P-610-TRU-9001
420-SWG/MCC-0003
Main LV SWGR/MCC Substation-1 (Power Generation)
610-TRU-9001
Transformer Rectifier Unit (GPF Underground Pipeline)-1
3
F
400
VAC
3.50
300 P-620-TRU-9001
420-SWG/MCC-0003
Main LV SWGR/MCC Substation-1 (Power Generation)
620-TRU-9001
Transformer Rectifier Unit (GPF Underground Pipeline)-2
3
F
400
VAC
3.50
301 P-630-TRU-9001
420-SWG/MCC-0003
Main LV SWGR/MCC Substation-1 (Power Generation)
630-TRU-9001
Transformer Rectifier Unit (Sales Gas Metering Underground Pipeline)
3
F
400
VAC
3.50
420-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
64.00
SUBSTATION-1 (POWER GENERATION) 302 P-420-AC-UPS-0001 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
303 P-420-AC-UPS-0001 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
420-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
64.00
304 P-420-AC-UPS-0001 C
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
64.00
305 P-420-DC-UPS-0001 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DC-UPS-0001 A
110 VDC UPS System - Feeder A
3
F
400
VAC
13.78
44 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
306 P-420-DC-UPS-0001 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DC-UPS-0001 B
110 VDC UPS System - Feeder B
3
F
400
VAC
13.78
307 P-420-HVAC-9001
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
420-HVAC-9001
HVAC Package for Substation-1
3
F
400
VAC
113.20
308 P-420-HVAC-9002
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-HVAC-9002
HVAC Package for Substation-1
3
F
400
VAC
27.00
309 P-420-HVAC-9003
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-HVAC-9003
HVAC Package for Substation-1
3
F
400
VAC
27.00
310 P-420-HVAC-9004
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
420-HVAC-9004
HVAC Package for Substation-1
3
F
400
VAC
27.00
311 P-420-HVAC-6010
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
420-HVAC-6010
HVAC Auxiliary for Substation 1
3
F
400
VAC
32.20
312 P-420-DPN-0001
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DPN-0001
Distribution Panel Indoor Lighting Substation-1
3
F
400
VAC
14.00
313 P-420-DPN-0002
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
420-DPN-0002
Distribution Panel Outdoor Lighting Substation-1
3
F
400
VAC
46.00
45 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DPE-0001
Distribution Panel Emergency Outdoor Lighting Substation-1
3
F
400
VAC
7.20
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
900-WLO-001
Welding Receptacle #1
3
F
400
VAC
13.00
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
900-WLO-002
Welding Receptacle #2
3
F
400
VAC
13.00
Equipment Tag No.
Description
314 P-420-DPE-0001
315 P-900-WLO-001
316 P-900-WLO-002
Power
Volt
kW
SUBSTATION-2 (TRAIN A AREA) 317 P-231-AC-UPS-0001 A
231-SWG/MCC-0003
Main LV Switchgear/MCC Substation-2 (Train-A)
231-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
40.00
318 P-231-AC-UPS-0001 B
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
40.00
319 P-231-AC-UPS-0001 C
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
40.00
320 P-231-DC-UPS-0001 A
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-DC-UPS-0001 A
110 VDC UPS System - Feeder A
3
F
400
VAC
10.92
46 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
321 P-231-DC-UPS-0001 B
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-DC-UPS-0001 B
110 VDC UPS System - Feeder B
3
F
400
VAC
10.92
322 P-231-HVAC-9001-01/02
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-9001
HVAC package for Substation 2
3
F
400
VAC
146.70
323 P-231-HVAC-9002
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-9002
HVAC package for Substation 2
3
F
400
VAC
34.00
324 P-231-HVAC-9003
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-9003
HVAC package for Substation 2
3
F
400
VAC
34.00
325 P-231-HVAC-9004
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-9004
HVAC package for Substation 2
3
F
400
VAC
34.00
326 P-231-HVAC-6010
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-6010
HVAC Auxiliary for Substation 2
3
F
400
VAC
45.00
327 P-231-DPN-0001
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-DPN-0001
Distribution Panel Indoor Lighting Substation-2
3
F
400
VAC
11.90
328 P-231-DPN-0002
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-DPN-0002
Distribution Panel Outdoor Lighting Substation-2
3
F
400
VAC
93.30
47 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-DPE-0001
Distribution Panel Emergency Outdoor Lighting Substation-2
3
F
400
VAC
12.50
330 P-900-WLO-003
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
900-WLO-003
Welding Receptacle #3
3
F
400
VAC
13.00
331 P-900-WLO-004
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
900-WLO-004
Welding Receptacle #4
3
F
400
VAC
13.00
332 P-900-WLO-007
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
900-WLO-007
Welding Receptacle #7
3
F
400
VAC
13.00
333 P-900-WLO-008
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
900-WLO-008
Welding Receptacle #8
3
F
400
VAC
13.00
Equipment Tag No.
Description
329 P-231-DPE-0001
Volt
kW
SUBSTATION-3 (TRAIN-B AREA) 334 P-280-AC-UPS-0001 A
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
32.00
335 P-280-AC-UPS-0001 B
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
32.00
336 P-280-AC-UPS-0001 C
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
32.00
48 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
337 P-280-DC-UPS-0001 A
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-DC-UPS-0001 A
110 VDC UPS System - Feeder A
3
F
400
VAC
8.06
338 P-280-DC-UPS-0001 B
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-DC-UPS-0001 B
110 VDC UPS System - Feeder B
3
F
400
VAC
8.06
339 P-290-HVAC-9001A-01/02
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
290-HVAC-9001A
HVAC package for Substation 3
3
F
400
VAC
224.20
340 P-290-HVAC-9001B
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
290-HVAC-9001B
HVAC package for Substation 3
3
F
400
VAC
71.00
341 P-290-HVAC-9001B
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
290-HVAC-9001B
HVAC package for Substation 3
3
F
400
VAC
71.00
342 P-290-HVAC-6010
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
290-HVAC-6010
HVAC Auxiliary for Substation 3
3
F
400
VAC
83.00
343 P-280-DPN-0001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-DPN-0001
Distribution Panel Indoor Lighting Substation-3
3
F
400
VAC
9.80
49 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
344 P-280-DPN-0002
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-DPN-0002
Distribution Panel Outdoor Lighting Substation-3
3
F
400
VAC
58.00
345 P-280-DPE-0001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-DPE-0001
Distribution Panel Emergency Outdoor Lighting Substation-3
3
F
400
VAC
15.00
346 P-900-WLO-005
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
900-WLO-005
Welding Receptacle #5
3
F
400
VAC
13.00
347 P-900-WLO-006
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
900-WLO-006
Welding Receptacle #6
3
F
400
VAC
13.00
Volt
kW
SUBSTATION-4 (UTILITY AREA) 348 P-480-AC-UPS-0001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
32.00
349 P-480-AC-UPS-0001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
32.00
350 P-480-AC-UPS-0001 C
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
32.00
50 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
351 P-480-DC-UPS-0001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-DC-UPS-0001 A
110 VDC UPS System - Feeder A
3
F
400
VAC
5.46
352 P-480-DC-UPS-0001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-DC-UPS-0001 B
110 VDC UPS System - Feeder B
3
F
400
VAC
5.46
353 P-480-HVAC-9001A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-HVAC-9001A
HVAC package for Substation 4
3
F
400
VAC
112.70
354 P-480-HVAC-9001B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-HVAC-9001B
HVAC package for Substation 4
3
F
400
VAC
34.00
355 P-480-HVAC-9001C
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-HVAC-9001C
HVAC package for Substation 4
3
F
400
VAC
34.00
356 P-480-HVAC-9003
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-HVAC-6010
HVAC Auxiliary for Substation 4
3
F
400
VAC
45.00
357 P-480-DPN-0001
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-DPN-0001
Distribution Panel Indoor Lighting Substation-4
3
F
400
VAC
8.00
358 P-480-DPN-0002
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-DPN-0002
Distribution Panel Outdoor Lighting Substation-4
3
F
400
VAC
57.35
51 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
359 P-480-DPE-0001
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Essential LV Switchgear/MCC Substation-4 (Utility)
480-DPE-0001
Distribution Panel Emergency Outdoor Lighting Substation-4
3
F
400
VAC
5.60
Equipment Tag No.
Description
480-SWG/MCC-0002
Volt
kW
INSTRUMENT BUILDING (280B-B-9001) 360 P-280A-HVAC-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-HVAC-9001
HVAC package for Instrument Building Train-A
3
F
400
VAC
27.00
361 P-280A-HVAC-9002
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-HVAC-9002
HVAC package for Instrument Building Train-A
3
F
400
VAC
27.00
362 P-280A-HVAC-9003
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-HVAC-9003
HVAC package for Instrument Building Train-A
3
F
400
VAC
27.00
363 P-280A-HVAC-6010
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-HVAC-6010
HVAC Aux for Instrument Building Train-A
3
F
400
VAC
86.00
364 P-280B-HVAC-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-HVAC-9001
HVAC package for Instrument Building Train-B
3
F
400
VAC
27.00
365 P-280B-HVAC-9002
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-HVAC-9002
HVAC package for Instrument Building Train-B
3
F
400
VAC
27.00
52 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
366 P-280B-HVAC-9003
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-HVAC-9003
HVAC package for Instrument Building Train-B
3
F
400
VAC
27.00
367 P-280B-HVAC-6010
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-HVAC-6010
HVAC Aux for Instrument Building Train-B
3
F
400
VAC
86.00
368
HOLD (NOTE-5)
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
HOLD (NOTE-5)
Instrument Panel (Train-A)
3
F
400
VAC
20.00
369
HOLD (NOTE-5)
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
HOLD (NOTE-5)
Instrument Panel (Train-B)
3
F
400
VAC
20.00
370 P-280A-LPN-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-A)
280A-LPN-9001
Distribution Panel Indoor Lighting & Small Power Instrument Building 280A
3
F
400
VAC
2.10
371 P-280B-LPN-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-LPN-9001
Distribution Panel Indoor Lighting & Small Power Instrument Building 280B
3
F
400
VAC
2.10
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-AC-UPS-0001 A
230 VAC UPS System - Feeder A Control Room
3
F
400
VAC
48.00
Volt
kW
CONTROL BUILDING 372 P-450-AC-UPS-0001 A
53 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
373 P-450-AC-UPS-0001 B
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-AC-UPS-0001 B
230 VAC UPS System - Feeder B Control Room
3
F
400
VAC
48.00
374 P-450-AC-UPS-0001 C
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass Control Room
3
F
400
VAC
48.00
375 P-450-HVAC-9001
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-9001
AHU DX
3
F
400
VAC
11.00
376 P-450-HVAC-9002
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-9002
AHU DX
3
F
400
VAC
2.20
377 P-450-HVAC-6010
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-6010
Air Conditioner Cassette Type (Total = 14 unit)
3
F
400
VAC
29.35
378 P-450-HVAC-6020
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-6020
Electric Duct Heater
3
F
400
VAC
106.03
379 P-450-HVAC-6030
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-6030
AC Auxiliary
3
F
400
VAC
6.30
380 P-900-LPN-4103
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
900-LPN-4103
Lighting (Indoor Control Room)
3
F
400
VAC
30.20
54 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
INFRASTRUCTURE SUBSTATION INFRASTRUCTURE 381 P-800-AC-UPS-0001 A
800-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
800-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
40.00
382 P-800-AC-UPS-0001 B
800-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
800-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
40.00
383 P-800-AC-UPS-0001 C
800-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
800-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
40.00
384 P-800-HVAC-1001
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
800-HVAC-1001
HVAC package for Infrastructure Substation
3
F
400
VAC
34.00
385 P-800-HVAC-1002
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
800-HVAC-1002
HVAC package for Infrastructure Substation
3
F
400
VAC
34.00
386 P-800-HVAC-1003
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
800-HVAC-1003
HVAC package for Infrastructure Substation
3
F
400
VAC
34.00
387 P-800-HVAC-6010
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
800-HVAC-6010
HVAC Auxiliary for Infrastructure Substation
3
F
400
VAC
45.00
55 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9021-01
Distribution Panel Indoor Lighting & Small Power Infrastructure Substation
3
F
400
VAC
6.20
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9021-02
Distribution Panel Outdoor Lighting Infrastructure Substation
3
F
400
VAC
41.25
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9021-03
Distribution Panel Emergency Lighting Infrastructure Substation
3
F
400
VAC
10.80
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9001A-01
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
900-DPN-9001B-01
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
900-DPN-9001C-01
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
3
F
400
VAC
3.80
3
F
400
VAC
3.60
Equipment Tag No.
Description
388 P-900-DPN-9021-01
389 P-900-DPN-9021-02
390 P-900-DPN-9021-03
Power
Volt
kW
Buildings Lighting and Socket Outlet Distribution Board 1
900-DPN-9001A-01
2
900-DPN-9001B-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
3
900-DPN-9001C-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9001D-01
Distribution Panel Indoor Lighting & Small Power Gate House Building
900-DPN-9002-01
Distribution Panel Indoor Lighting & Small Power Guard House Building
4
900-DPN-9001D-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
5
900-DPN-9002-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
56 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
900-DPN-9003-01
Distribution Panel Indoor Lighting & Small Power Security Gate House
3
F
400
VAC
3.20
900-DPN-9004-01
Distribution Panel Indoor Lighting Administration Building
3
F
400
VAC
12.40
3
F
400
VAC
35.00
Volt
kW
6
P-900-DPN-9003-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
7
P-900-DPN-9004-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9004-02
Distribution Panel Small Power Administration Building
900-DPN-9004-03
Distribution Panel Indoor Lighting & Small Power Telcom Building
3
F
400
VAC
3.80
3
F
400
VAC
2.80
8
P-900-DPN-9004-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
9
P-900-DPN-9004-03
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9005-01
Distribution Panel Indoor Lighting Fire Emegency Station
900-DPN-9005-02
Distribution Panel Small Power Fire Emegency Station
3
F
400
VAC
9.50
3
F
400
VAC
10.00
10
P-900-DPN-9005-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
11
P-900-DPN-9005-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9005-03
Distribution Panel Indoor Lighting Office Building
900-DPN-9005-04
Distribution Panel Small Power Office Building
3
F
400
VAC
44.50
900-DPN-9005-05
Distribution Panel Indoor Lighting Laboratory Building
3
F
400
VAC
7.35
12
P-900-DPN-9005-03
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
13
P-900-DPN-9005-04
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
14
P-900-DPN-9005-05
57 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
900-DPN-9005-06
Distribution Panel Small Power Laboratory Building
3
F
400
VAC
21.00
900-DPN-9007-01
Distribution Panel Lighting & Small Power Mosque
3
F
400
VAC
8.00
3
F
400
VAC
6.20
Volt
kW
15
P-900-DPN-9005-06
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
16
P-900-DPN-9007-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9009-01
Distribution Panel Indoor Lighting Kitchen & Dining Hall
900-DPN-9009-02
Distribution Panel Indoor Lighting Kitchen & Dining Hall
3
F
400
VAC
11.00
3
F
400
VAC
6.40
17
P-900-DPN-9009-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
18
P-900-DPN-9009-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9011-01
Distribution Panel Lighting & Small Power Laundry Center Building
900-DPN-9011-02
Distribution Panel Indoor Lighting Medical Center Building
3
F
400
VAC
8.00
3
F
400
VAC
12.00
19
P-900-DPN-9011-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
20
P-900-DPN-9011-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9011-03
Distribution Panel Small Power Medical Center Building
900-DPN-9012A-01
Distribution Panel Indoor Lighting Dormitory Operator & Staff
3
F
400
VAC
22.40
900-DPN-9012A-02
Distribution Panel Small Power Dormitory Operator & Staff
3
F
400
VAC
99.00
21
P-900-DPN-9011-03
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
22
P-900-DPN-9012A-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
23
P-900-DPN-9012A-02
58 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
900-DPN-9012B-01
Distribution Panel Indoor Lighting Dormitory Field Superintendent
3
F
400
VAC
12.82
900-DPN-9012B-02
Distribution Panel Small Power Dormitory Field Superintendent
3
F
400
VAC
54.50
3
F
400
VAC
20.00
Volt
kW
24
P-900-DPN-9012B-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
25
P-900-DPN-9012B-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9013-01
Distribution Panel Indoor Lighting Sport Hall & Multipurpose Building
900-DPN-9013-02
Distribution Panel Small Power Sport Hall & Multipurpose Building
3
F
400
VAC
60.50
3
F
400
VAC
30.00
26
P-900-DPN-9013-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
27
P-900-DPN-9013-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9014-01
Distribution Panel Indoor Lighting Operation Warehouse Building
900-DPN-9014-02
Distribution Panel Small Power Operation Warehouse Building
3
F
400
VAC
31.50
3
F
400
VAC
1.70
28
P-900-DPN-9014-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
29
P-900-DPN-9014-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9015-01
Distribution Panel Indoor Lighting & Small Power Vehicle Fuel Station Shelter
900-DPN-9016-01
Distribution Panel Indoor Lighting Operation Maintenance Building
3
F
400
VAC
38.00
900-DPN-9016-02
Distribution Panel Small Power Operation Maintenance Building
3
F
400
VAC
39.00
30
P-900-DPN-9015-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
31
P-900-DPN-9016-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
32
P-900-DPN-9016-02
59 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
33
P-900-DPN-9017-01
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
400VAC Switchgear/MCC Infrastructure
900-DPN-9017-01
Distribution Panel Indoor Lighting & Small Power Chemical Storage Building
3
F
400
VAC
20.00
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9001
Distribution Panel Air Conditioning Guard House
3
F
400
VAC
3.54
900-HVAC-9002A
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
900-HVAC-9002B
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
3
F
400
VAC
7.06
Equipment Tag No.
Description
800-SWG/MCC-0002
Volt
kW
Buildings Air Conditioned Distribution Board 34
P-900-HVAC-9001
35
P-900-HVAC-9002A
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
36
P-900-HVAC-9002B
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9002C
Distribution Panel Air Conditioning Gate House
900-HVAC-9002D
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
3
F
400
VAC
10.66
3
F
400
VAC
28.90
37
P-900-HVAC-9002C
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
38
P-900-HVAC-9002D
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9003
Distribution Panel Air Conditioning Security Gate House
900-HVAC-9004
Distribution Panel Air Conditioning Telcom Building
39
P-900-HVAC-9003
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
40
P-900-HVAC-9004
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
60 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
900-HVAC-9005
Distribution Panel Air Conditioning Fire Emergency Station
3
F
400
VAC
32.00
900-HVAC-9007
Distribution Panel Air Conditioning Mosque
3
F
400
VAC
58.00
3
F
400
VAC
93.73
Volt
kW
41
P-900-HVAC-9005
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
42
P-900-HVAC-9007
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9008
Distribution Panel Air Conditioning Administration Building
900-HVAC-9009
Distribution Panel Air Conditioning Kitchen & Dinning Hall Building
3
F
400
VAC
34.85
3
F
400
VAC
23.98
43
P-900-HVAC-9008-01/02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
44
P-900-HVAC-9009
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9010
Distribution Panel Air Conditioning Medical Center Building
900-HVAC-9011
Distribution Panel Air Conditioning Laundry Center Building
3
F
400
VAC
19.00
3
F
400
VAC
21.51
45
P-900-HVAC-9010
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
46
P-900-HVAC-9011
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9012A
Distribution Panel Air Conditioning Dormitory Operator & Staff
900-HVAC-9012B
Distribution Panel Air Conditioning Dormitory Field Superintendent
3
F
400
VAC
11.52
900-HVAC-9013
Distribution Panel Air Conditioning Sport Hall & Multipurposed Building
3
F
400
VAC
50.63
47
P-900-DPN-9012A
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
48
P-900-DPN-9012B
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
49
P-900-HVAC-9013
61 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
900-HVAC-9014
Distribution Panel Air Conditioning Operation Warehouse Building
3
F
400
VAC
66.68
900-HVAC-9016
Distribution Panel Air Conditioning Operation Maintenance Building
3
F
400
VAC
42.27
3
F
400
VAC
53.65
Volt
kW
50
P-900-HVAC-9014-01/02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
51
P-900-HVAC-9016-01/02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9017
Distribution Panel Air Conditioning Chemical Storage Building
900-HVAC-9016
Distribution Panel Air Conditioning Operation Warehouse Building
3
F
400
VAC
66.68
3
F
400
VAC
37.74
52
P-900-HVAC-9017-01/02/03
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
53
P-900-HVAC-9016-01/02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9019
Distribution Panel Air Conditioning Office Building
54
P-900-HVAC-9019
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
55
P-900-HVAC-9020
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9020
Distribution Panel Air Conditioning Laboratory Building
3
F
400
VAC
40.08
CENTRAL WELL PAD 56
P-211-P-9001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-P-9001
Potable Water Pump
3
M
400
VAC
0.37
57
P-211-P-9004
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-P-9004
Close Drain Pump
3
M
400
VAC
18.50
62 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
58
P-211-UPS-0001 A
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
24.00
59
P-211-UPS-0001 B
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
24.00
60
P-211-UPS-0001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-UPS-0001
230 VAC UPS System - Bypass
3
F
400
VAC
24.00
61
P-211-HVAC-9001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
211-HVAC-9001
HVAC package for Central Wellpad Substation
3
F
400
VAC
27.00
62
P-211-HVAC-9002
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
211-HVAC-9002
HVAC package for Central Wellpad Substation
3
F
400
VAC
27.00
63
P-211-HVAC-9003
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
211-HVAC-9003
HVAC package for Central Wellpad Substation
3
F
400
VAC
27.00
64
P-211-HVAC-6010
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
211-HVAC-6010
HVAC Auxiliry for Central Wellpad Substation
3
F
400
VAC
33.00
63 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
65
P-211-DPN-0001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-DPN-0001
Flare Package
3
F
400
VAC
3.00
66
P-211-DPN-0002
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-DPN-0002
Distribution Panel Outdoor Lighting Central Wellpad
3
F
400
VAC
24.22
67
P-211-DPN-0003
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-DPN-0003
Distribution Panel Indoor Lighting Central Wellpad
3
F
400
VAC
3.70
68
P-211-DPE-0001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-DPE-0001
Distribution Panel Emergency Outdoor Lighting Central Wellpad
3
F
400
VAC
7.27
EAST WELL PAD 69
P-212-P-9001
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-P-9001
Potable Water Pump
3
M
400
VAC
0.37
70
P-212-P-9004
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-P-9004
Close Drain Pump
3
M
400
VAC
45.00
71
P-212-UPS-1004 A
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-UPS-1004 A
230 VAC UPS System - Feeder A
3
F
400
VAC
24.00
64 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
72
P-212-UPS-1004 B
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-UPS-1004 B
230 VAC UPS System - Feeder B
3
F
400
VAC
24.00
73
P-212-UPS-1004
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-UPS-1004
230 VAC UPS System - Bypass
3
F
400
VAC
24.00
74
P-212-HVAC-9001
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-HVAC-9001
HVAC package for East Wellpad Substation
3
F
400
VAC
27.00
75
P-212-HVAC-9002
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-HVAC-9002
HVAC package for East Wellpad Substation
3
F
400
VAC
27.00
76
P-212-HVAC-9003
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-HVAC-9003
HVAC package for East Wellpad Substation
3
F
400
VAC
27.00
77
P-212-HVAC-6010
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-HVAC-6010
HVAC package for East Wellpad Substation
3
F
400
VAC
33.00
78
P-212-DPN-1001
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-DPN-1001
Flare Package
3
F
400
VAC
3.00
79
P-212-DPN-1002
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-DPN-1002
Distribution Panel Outdoor Lighting East Wellpad
3
F
400
VAC
36.00
65 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
80
P-212-DPN-1003
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-DPN-1003
Distribution Panel Indoor Lighting East Wellpad
3
F
400
VAC
3.70
81
P-212-DPE-0001
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-DPE-0001
Distribution Panel Emergency Outdoor Lighting East Wellpad
3
F
400
VAC
9.60
SALES GAS METERING STATION 82
P-710-P-9001
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-P-9001
Potable Water Pump
3
M
400
VAC
0.37
83
P-710-V-9004
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-V-9004
Instrument Air Compressor
3
M
400
VAC
11.00
84
P-710-AC-UPS-1001 A
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-AC-UPS-1001 A
Gas Metering 230VAC UPS System Feeder A
3
F
400
VAC
24.00
85
P-710-AC-UPS-1001 B
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-AC-UPS-1001 B
Gas Metering 230VAC UPS System Feeder B
3
F
400
VAC
24.00
86
P-710-AC-UPS-1001 C
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-AC-UPS-1001 C
Gas Metering 230VAC UPS System Bypass
3
F
400
VAC
24.00
66 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
87
P-710-HVAC-7101
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-HVAC-7101
Metering Station Building HVAC
3
F
400
VAC
5.20
88
P-710-HVAC-7102
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-HVAC-7102
Metering Station Building HVAC
3
F
400
VAC
5.20
89
P-710-HVAC-7103
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-HVAC-7103
Metering Station Building HVAC
3
F
400
VAC
5.20
90
P-710-HVAC-6010
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-HVAC-6010
Metering Station Building HVAC Auxiliary
3
F
400
VAC
5.20
91
P-710-DPN-1003
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-DPN-1003
Distribution Panel Indoor Lighting East Wellpad
3
F
400
VAC
16.43
92
P-710-DPN-2001
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-SO-001
Metering Station Building Socket Outlet
3
F
400
VAC
5.00
93
P-710-DPN-1002
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-DPN-1002
Distribution Panel Indoor Lighting East Wellpad
3
F
400
VAC
29.00
94
P-710-DPE-0001
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-DPE-0001
Distribution Panel Emergency Outdoor Lighting East Wellpad
3
F
400
VAC
7.00
67 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
95
P-710-LPR-1001
D
230 V POWER CABLES
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-SO-002
Metering Station Welding Outlet
3
F
400
VAC
13.00
(NOTE-4)
Motor Space Heater (Continuous) GPF (Qty=73 ea)
1
M
230
VAC
0.23
(NOTE-4)
Motor Space Heater (Intermittent) GPF (Qty=6 ea)
1
M
230
VAC
0.23
(NOTE-4)
Motor Space Heater (Stand-by) GPF (Qty=105 ea)
1
M
230
VAC
0.23
211-SH-1001
Space Heater for Close Drain Pump Central Wellpad
1
M
230
VAC
0.20
Volt
kW
Space Heater 1
(NOTE-4)
420-SWG/MCC-0004
2
(NOTE-4)
420-SWG/MCC-0004
3
(NOTE-4)
420-SWG/MCC-0004
4
P-211-SH-1001
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation)
68 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
5
P-212-SH-1001
420-SWG/MCC-0004
6
P-420-SH-1011
420-SWG/MCC-0004
7
P-420-SH-2011
420-SWG/MCC-0004
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
212-SH-1001
Space Heater for Close Drain Pump East Wellpad
1
M
230
VAC
0.20
420-SH-1011
STG-A Space Heater
1
M
230
VAC
2.25
420-SH-2011
STG-B Space Heater
1
M
230
VAC
2.25
Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation)
Volt
kW
230VAC UPS SUBSTATION-1 (POWER GENERATION) 8
P-420-UCP-SG-0001A
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-UCP-SG-0001A
UCP STG-A
1
F
210
VAC
1.00
9
P-420-BCH-1001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-BCH-1001
Battery Charger STG-A
1
F
210
VAC
1.00
10
P-420-UCP-4001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-UCP-4001
UCP Essential Generator
1
F
210
VAC
1.00
11
P-420-BCH-4001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-BCH-4001
Battery Charger Essential Generator
1
F
210
VAC
1.00
12
P-420-VCB-0001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-VCB-0001
Motor Charging VCB for 420-SWG-0001
1
M
210
VAC
1.80
69 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
13
P-420-VCB-0002
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-VCB-0002
Motor Charging VCB for 420-SWG-0002
1
M
210
VAC
3.00
Volt
kW
14
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O
1
F
210
VAC
0.50
15
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
1.00
16
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
ECMS NETWORK SERVER
1
F
210
VAC
1.00
17
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
ECMS PRINTER
1
F
210
VAC
0.50
18
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
LCP STG-A
1
F
210
VAC
1.00
19
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
SIS REMOTE I/O
1
F
210
VAC
0.70
20
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O
1
F
210
VAC
0.20
21
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
LOAD SHEDDING PANEL-A
1
F
210
VAC
1.00
70 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
22
P-420-DPE-0002
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-DPE-0001
Distribution Panel Emergency Outdoor Lighting Substation-1
1
F
210
VAC
7.20
Equipment Tag No.
Description
Volt
kW
23
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
TELECOM CABINET
1
F
210
VAC
1.00
24
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
HP BOILER CABINET
1
F
210
VAC
1.00
25
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
LP BOILER CABINET
1
F
210
VAC
1.00
26
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
MAIN ECMS-A PANEL
1
F
210
VAC
1.50
27
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
28
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
FACP CABINET
1
F
210
VAC
0.50
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-UCP-SG-0001B
UCP STG-B
1
F
210
VAC
1.00
29
P-420-UCP-SG-0001B
71 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
30
P-420-BCH-2001
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-BCH-2001
Battery Charger STG-B
1
F
210
VAC
1.00
31
P-420-UCP-0001
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-UCP-0001
UCP Emergency Diesel Generator
1
F
210
VAC
1.00
32
P-420-BCH-5001
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-BCH-5001
Battery Charger Emergency Generator
1
F
210
VAC
0.50
33
P-420-VCB-0003
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-VCB-0003
Motor Charging VCB for 420-SWG-0003
1
M
210
VAC
0.30
34
P-420-VCB-0004
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-VCB-0004
Motor Charging VCB for 420-SWG-0004
1
M
210
VAC
0.50
35
P-420-VCB-0005
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-VCB-0005
Motor Charging VCB for 420-SWG-0005
1
M
210
VAC
0.30
36
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
PCS REMOTE I/O
1
F
210
VAC
0.50
37
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
SIS REMOTE I/O
1
F
210
VAC
0.70
38
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
F&G REMOTE I/O
1
F
210
VAC
0.20
72 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
39
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
ECMS OPC SERVER
1
F
210
VAC
1.00
40
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
LCP STG-B
1
F
210
VAC
1.00
41
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
LCP ESSENTIAL GEN
1
F
210
VAC
1.00
42
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
ECMS WORK STATION
1
F
210
VAC
1.00
43
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
ECMS NETWORK SWITCH
1
F
210
VAC
0.20
44
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
LOAD SHEDDING PANEL-B
1
F
210
VAC
1.00
45
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
TELECOM CABINET
1
F
210
VAC
1.00
46
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
HP BOILER CABINET
1
F
210
VAC
1.00
47
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
LP BOILER CABINET
1
F
210
VAC
1.00
73 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
48
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
MAIN ECMS-B PANEL
1
F
210
VAC
1.50
49
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
SUBSTATION-2 (TRAIN A AREA) 50
P-231-VCB-0001
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
231-VCB-0001
Motor Charging VCB : 231-SWG-0001
1
M
210
VAC
2.20
51
P-231-VCB-0002
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
231-VCB-0002
Motor Charging ACB : 231-SWG-0002
1
M
210
VAC
0.30
52
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
53
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
0.40
54
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
55
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
74 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
56
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL
1
F
210
VAC
0.50
57
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
58
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
59
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
VRU LCP
1
F
210
VAC
0.50
60
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
61
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
RECYLE GAS COMPRESSOR LCP
1
F
210
VAC
0.50
62
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
HP/LP A FLARE LCP
1
F
210
VAC
1.00
63
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
SALES GAS COMPRESSOR LCP
1
F
210
VAC
1.00
64
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
TEG LCP
1
F
210
VAC
0.50
75 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
65
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
SRU LCP
1
F
210
VAC
0.50
66
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
TGU LCP
1
F
210
VAC
0.50
67
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
UPS DB at Instrument Building 280A-B-9001
1
F
210
VAC
3.50
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
231-VCB-0003
Motor Charging VCB : 231-SWG-0003
1
M
210
VAC
0.50
68
P-231-VCB-0003
69
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
70
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
71
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
VRU LCP
1
F
210
VAC
0.50
72
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
ECMS WORKSTATION
1
F
210
VAC
0.50
76 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
73
74
75
76
HOLD (NOTE-5)
P-231-DPE-0001 HOLD (NOTE-5)
P-231-VCB-0004
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
0.20
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
231-DPE-0001
Distribution Panel Emergency Outdoor Lighting Substation-2
1
F
210
VAC
8.80
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL
1
F
210
VAC
0.50
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
231-VCB-0004
Motor Charging VCB : 231-SWG-0004
1
M
210
VAC
0.30
Volt
kW
77
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
78
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
79
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
80
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
81
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
RECYLE GAS COMPRESSOR LCP
1
F
210
VAC
0.50
77 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
82
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
SALES GAS COMPRESSOR LCP
1
F
210
VAC
1.00
83
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
TEG LCP
1
F
210
VAC
0.50
84
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
SRU LCP
1
F
210
VAC
0.50
85
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
TGU LCP
1
F
210
VAC
0.50
SUBSTATION-3 (TRAIN-B AREA) 86
P-280-VCB-0001
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
280-VCB-0001
Motor Charging VCB 280-SWG-0001
1
M
210
VAC
1.40
87
P-280-VCB-0002
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
280-VCB-0002
Motor Charging ACB : 280-SWG-0002
1
M
210
VAC
0.50
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
280-HVAC-9001
HVAC CONTROL PANEL
1
F
210
VAC
1.00
88
89
HOLD (NOTE-5) C-280-HVAC-9001
78 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
90
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
91
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
92
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL (280A-B9001)
1
F
210
VAC
0.50
93
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
94
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
95
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
0.20
96
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
UPS DB at Instrument Building 280B-B-9001
1
F
210
VAC
3.50
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
280-VCB-0003
Motor Charging VCB : 280-SWG-0003
1
M
210
VAC
0.30
97
P-280-VCB-0003
79 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
98
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL (280A-B9001)
1
F
210
VAC
0.50
99
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
100
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
101
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
ECMS WORKSTATION
1
F
210
VAC
0.50
102
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
0.80
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
280-DPE-0001
Distribution Panel Emergency Outdoor Lighting Substation-3
1
F
210
VAC
10.40
103 P-280-DPE-0001
104
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
105
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
106
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
80 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
108 P-480-VCB-0001
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
480-VCB-0001
Motor Charging VCB 480-SWG-0001
1
M
210
VAC
2.00
109 P-480-VCB-0001
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
480-VCB-0001
Motor Charging ACB : 480-SWG-0002
1
M
210
VAC
0.30
107
HOLD (NOTE-5)
Volt
kW
SUBSTATION-4 (UTILITY AREA)
110
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
111
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
1.00
112
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
113
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
INSTRUMENT AIR COMPRESSORA LCP
1
F
210
VAC
1.00
114
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
INSTRUMENT AIR COMPRESSORB LCP
1
F
210
VAC
1.00
81 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
115
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
INSTRUMENT AIR COMPRESSORC LCP
1
F
210
VAC
1.00
116
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL
1
F
210
VAC
0.50
117
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
480-DPE-0001
Distribution Panel Emergency Outdoor Lighting Substation-4
1
F
210
VAC
4.00
118 P-480-DPE-0001
119
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
120
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
121
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
0.20
122
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
82 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
123
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
AIR MANAGER LCP
1
F
210
VAC
0.50
124
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL
1
F
210
VAC
0.50
125
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
126
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
127
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
ECMS WORKSTATION
1
F
210
VAC
0.50
128
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
1.00
129
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
INSTRUMENT AIR DRYER-A LCP
1
F
210
VAC
1.00
130
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
INSTRUMENT AIR DRYER-B LCP
1
F
210
VAC
1.00
131
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
INSTRUMENT AIR DRYER-C LCP
1
F
210
VAC
1.00
83 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
132
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
FIRE WATER PANEL BATTERY CHARGER-A
1
F
210
VAC
1.00
133
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
FIRE WATER PANEL BATTERY CHARGER-B
1
F
210
VAC
1.00
134
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
135
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
TELECOM CABINET
1
F
210
VAC
1.00
136
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
137
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
CONTROL BUILDING 138
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
PCS SYSTEM CABINET
1
F
210
VAC
1.00
139
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
SIS SYSTEM CABINET
1
F
210
VAC
0.50
84 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
140
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
F&G SYSTEM CABINET
1
F
210
VAC
0.20
141
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
142
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
LDS SYSTEM COMPUTER
1
F
210
VAC
0.65
143
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
OFFICE APPLICATION COMPUTER
1
F
210
VAC
0.65
144
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
MM SERVER
1
F
210
VAC
0.65
145
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
PROCESS MONITORING COMP
1
F
210
VAC
0.65
146
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
RTS SERVER
1
F
210
VAC
0.65
147
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
FO BACKBONE PATCH PANEL
1
F
210
VAC
2.00
148
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
MOM SYSTEM CABINET 2
1
F
210
VAC
0.65
85 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
149
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
SOE WORKSTATION
1
F
210
VAC
0.65
150
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
F&G MONITOR WORKSTATION
1
F
210
VAC
0.40
151
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
FIRE STATION MONITOR
1
F
210
VAC
0.40
152
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
0.60
153
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
ECMS-A PANEL
1
F
210
VAC
0.50
154
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
ECMS-A WORKSTATION
1
F
210
VAC
0.65
155
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
CWE SYSTEM CABINET
1
F
210
VAC
1.00
156
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
MOM SYSTEM CABINET 1
1
F
210
VAC
1.00
157
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
1.00
86 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
158
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
OPERATOR TRAINING SYSTEM CABINET
1
F
210
VAC
0.60
159
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PCS SYSTEM CABINET
1
F
210
VAC
1.00
160
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
SIS SYSTEM CABINET
1
F
210
VAC
0.50
161
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
F&G SYSTEM CABINET
1
F
210
VAC
0.20
162
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
163
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
CCTV SERVER
1
F
210
VAC
0.65
164
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
EDMS SERVER
1
F
210
VAC
1.30
165
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
MIS BACK-UP SERVER
1
F
210
VAC
0.65
87 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
166
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
APMS SERVER
1
F
210
VAC
0.65
167
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
EPMS SERVER
1
F
210
VAC
0.65
168
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
HISTORIAN OPC SERVER
1
F
210
VAC
1.30
169
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PRINTER
1
F
210
VAC
0.69
170
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
FO BACKBONE PATCH PANEL
1
F
210
VAC
1.00
171
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
CCTV SYSTEM
1
F
210
VAC
1.50
172
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
CCTV MONITOR
1
F
210
VAC
0.80
173
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PAGA STATION
1
F
210
VAC
0.40
174
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PCS PLASMA TV
1
F
210
VAC
1.87
88 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
175
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
MOM SYSTEM CABINET 2
1
F
210
VAC
0.65
176
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
1.60
177
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
SIS CONSOLE
1
F
210
VAC
0.30
178
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
F&G CONSOLE
1
F
210
VAC
0.30
179
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
ECMS-B PANEL
1
F
210
VAC
0.50
180
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PCS EWS
1
F
210
VAC
0.40
181
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
ESD/F&G EWS
1
F
210
VAC
0.40
182
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
AMS EWS
1
F
210
VAC
0.40
183
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
CWE SYSTEM CABINET
1
F
210
VAC
1.00
89 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
184
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
MOM SYSTEM CABINET 1
1
F
210
VAC
1.00
185
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
OPERATOR TRAINING SYSTEM CABINET
1
F
210
VAC
0.60
186
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
1.00
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
900-DPE-0001
Distribution Panel Emergency Outdoor Lighting Central Wellpad
1
F
210
VAC
10.80
188 P-900-SWG/MCC-0001 A
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
900-SWG/MCC-0001
11 kV Switchgear Infrastructure Substation (BUS A)
1
F
210
VAC
0.50
189 P-900-BCH-5001 A
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
900-BCH-5001 A
Back-Up Genset Charger
1
F
210
VAC
0.75
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
900-SWG/MCC-0002 A
400 VAC Switchgear/MCC Infrastructure Substation (BUS A)
1
F
210
VAC
1.00
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
ECMS Panel
1
F
210
VAC
0.50
INFRASTRUCTURE AREA SUBSTATION 187 P-900-DPE-0001
190 P-900-SWG/MCC-0002 A
191
HOLD (NOTE-5)
90 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
192
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
ECMS Workstation
1
F
210
VAC
0.50
193
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
2.00
194
HOLD (NOTE-5)
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
HOLD (NOTE-5)
Telecom UPS DB
1
F
210
VAC
13.40
195 P-900-BCH-5001 B
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
900-BCH-5001
Back-Up Genset Charger
1
F
210
VAC
0.75
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
900-SWG/MCC-0002 B
400 VAC Switchgear/MCC Infrastructure Substation (BUS B)
1
F
210
VAC
1.00
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
HOLD (NOTE-5)
ECMS Panel
1
F
210
VAC
0.50
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
900-SWG/MCC-0001 B
11 kV Switchgear Infrastructure Substation (BUS B)
1
F
210
VAC
0.50
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
2.00
196 P-900-SWG/MCC-0002 B
197
HOLD (NOTE-5)
198 P-900-SWG/MCC-0001 B
199
HOLD (NOTE-5)
91 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
200
HOLD (NOTE-5)
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
2.00
Volt
kW
CENTRAL WELLPAD SUBSTATION 201
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
0.50
202
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.50
203
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
HOLD (NOTE-5)
Flow Comp Cabinet
1
F
210
VAC
0.50
204 P-211-SWG/MCC-0002
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
211-SWG-MCC-0002 A
400 VAC Switchgear/MCC Well Pad Central (BUS A)
1
F
210
VAC
1.00
205 P-211-ECMS-0001 A
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
211-ECMS-0001 A
ECMS Panel
1
F
210
VAC
0.50
206 P-211-ECMS-0002
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
P-211-ECMS-0002
ECMS PC
1
F
210
VAC
0.50
207 P-211-SWG/MCC-0001
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
211-SWG-MCC-0001 A
11 kV Switchgear Central Well Pad Substation (BUS A)
1
F
210
VAC
0.50
92 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
208 P-211-BCH-0001 A
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
211-BCH-0001
Back-Up Genset Charger
1
F
210
VAC
0.75
Volt
kW
209
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
210
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.50
211
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
HOLD (NOTE-5)
Flow Comp Cabinet
1
F
210
VAC
0.30
212 P-211-SWG-MCC-0002 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-SWG-MCC-0002 B
400 VAC Switchgear/MCC Well Pad Central (BUS B)
1
F
210
VAC
0.75
213 P-211-ECMS-0001 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-ECMS-0001 B
ECMS Panel
1
F
210
VAC
0.50
214 P-211-SWG-MCC-0001 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-SWG-MCC-0001 B
11 kV Switchgear Central Well Pad Substation (BUS B)
1
F
210
VAC
0.50
215 P-211-DPE-0001
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-DPE-0001
Distribution Panel Emergency Outdoor Lighting Central Wellpad
1
F
210
VAC
5.60
93 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
216 P-211-DPN-1001
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-DPN-1001
FLARE PANEL
1
F
210
VAC
0.50
217 C-211-HVAC-9004
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-HVAC-9004
HVAC CONTROL PANEL
1
F
210
VAC
0.50
Volt
kW
EAST WELLPAD SUBSTATION 218
HOLD (NOTE-5)
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
219
HOLD (NOTE-5)
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.50
220
HOLD (NOTE-5)
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
HOLD (NOTE-5)
Flow Comp Cabinet
1
F
210
VAC
0.30
221 P-212-SWG-MCC-0002 A
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-SWG-MCC-0002 A
400 VAC Switchgear/MCC East Well Pad Substation (BUS A)
1
F
210
VAC
0.75
222 P-212-ECMS-0001 A
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-ECMS-0001 A
ECMS Panel
1
F
210
VAC
0.50
223 P-212-ECMS-0002
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-ECMS-0002
ECMS PC
1
F
210
VAC
0.50
94 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-SWG-MCC-0001 A
11 kV Switchgear East Well Pad Substation (BUS A)
1
F
210
VAC
0.50
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-BCH-0001
Back-Up Genset Charger
1
F
210
VAC
0.75
Equipment Tag No.
Description
224 P-212-SWG-MCC-0001 A
225 P-212-BCH-0001 A
Volt
kW
226
HOLD (NOTE-5)
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
227
HOLD (NOTE-5)
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.50
228
HOLD (NOTE-5)
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
HOLD (NOTE-5)
Flow Comp Cabinet
1
F
210
VAC
0.30
229 P-212-SWG-MCC-0002 B
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
212-SWG-MCC-0002 B
400 VAC Switchgear/MCC East Well Pad Substation (BUS B)
1
F
210
VAC
0.75
230 P-212-ECMS-0001 B
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
212-ECMS-0001 B
ECMS Panel
1
F
210
VAC
0.50
231 P-212-SWG-MCC-0001 B
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
212-SWG-MCC-0001 B
11 kV Switchgear East Well Pad Substation (BUS B)
1
F
210
VAC
0.50
95 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
212-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
212-DPE-0001
Distribution Panel Emergency Outdoor Lighting East Wellpad
1
F
210
VAC
9.60
233 P-212-DPN-1001
212-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
212-DPN-1001
FLARE PANEL
1
F
210
VAC
0.50
234 C-212-HVAC-9004
212-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
212-HVAC-9004
HVAC CONTROL PANEL
1
F
210
VAC
0.50
Equipment Tag No.
Description
232 P-212-DPE-0001
Volt
kW
SALES GAS METERING SUBSTATION 235
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
236
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.40
237
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
Flow Computer System
1
F
210
VAC
1.80
238
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
Laser Jet Printer
1
F
210
VAC
0.50
239
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
Sales Gas Ccmputer
1
F
210
VAC
0.70
96 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
240
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
ECMS PC
1
F
210
VAC
0.50
241
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
ECMS Panel
1
F
210
VAC
0.50
242 P-710-BCH-5001 A
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
710-BCH-5001
Back-Up Genset Charger
1
F
210
VAC
0.75
243 P-710-SWG/MCC-0002 A
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
710-SWG/MCC-0002A
400 VAC Switchgear/MCC Sales Gas Metering Substation (BUS A)
1
F
210
VAC
0.50
244 P-710-SWG-0001 A
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
710-SWG-0001A
11 kV Switchgear Sales Gas Metering Substation (BUS A)
1
F
210
VAC
0.50
245
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
246
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.40
247
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
Dot Maztrix Printer
1
F
210
VAC
0.10
97 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
248
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
Flow Computer System
1
F
210
VAC
1.80
249
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
ECMS Panel
1
F
210
VAC
0.50
250 P-710-UCP-5001
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-UCP-5001
Back-Up Genset UCP
1
F
210
VAC
0.75
251 P-710-DPE-0001
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-DPE-0001
Distribution Panel Emergency Outdoor Lighting Sales Gas Metering
1
F
210
VAC
4.00
252 C-710-HVAC-9004
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-HVAC-9004
HVAC CONTROL PANEL
1
F
210
VAC
0.50
253 P-710-SWG/MCC-0002 B
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-SWG/MCC-0002B
400 VAC Switchgear/MCC Sales Gas Metering Substation (BUS B)
1
F
210
VAC
0.50
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-SWG-0001B
11 kV Switchgear Sales Gas Metering Substation (BUS B)
1
F
210
VAC
0.50
254 P-710-SWG-0001 B
98 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
E
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
DC POWER CABLES DC UPS SUBSTATION-1 (POWER GENERATION)
1
C-420-SWG/MCC-0001A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0001A
11 kV Switchgear: 420-SWG-0001A
1
F
108
VDC
1.00
2
C-420-SWG/MCC-0001B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0001B
11 kV Switchgear: 420-SWG-0001B
1
F
108
VDC
1.00
3
C-420-SWG/MCC-0003A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0003A
400 VAC MCC : 420-MCC-0003A
1
F
108
VDC
1.00
4
C-420-SWG/MCC-0003B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0003B
400 VAC MCC : 420-MCC-0003B
1
F
108
VDC
1.00
5
C-420-SWG/MCC-0005A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0005A
400 VAC MCC : 420-MCC-0005A
1
F
108
VDC
1.00
6
C-420-SWG/MCC-0004A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0004A
400 VAC MCC : 420-MCC-0004A
1
F
108
VDC
1.00
7
C-420-SWG/MCC-0004B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0004B
400 VAC MCC : 420-MCC-0004B
1
F
108
VDC
1.00
99 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
8
C-420-SWG/MCC-0005B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0005B
400 VAC MCC : 420-MCC-0005B
1
F
108
VDC
1.00
9
C-420-SWG/MCC-0002A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0002A
6,6 kV Switchgear: 420-SWG-0002A
1
F
108
VDC
1.00
10
C-420-SWG/MCC-0002B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0002B
6,6 kV Switchgear: 420-SWG-0002B
1
F
108
VDC
1.00
11
C-420-TRF-0001A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0001A
TRAFO 420-TRF-0001A
1
F
108
VDC
0.10
12
C-420-TRF-0001B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0001B
TRAFO 420-TRF-0001B
1
F
108
VDC
0.10
13
C-420-TRF-0002A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0002A
TRAFO 420-TRF-0002A
1
F
108
VDC
0.10
14
C-420-TRF-0002B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0002B
TRAFO 420-TRF-0002B
1
F
108
VDC
0.10
15
C-420-TRF-0003A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0003A
TRAFO 420-TRF-0003A
1
F
108
VDC
0.10
16
C-420-TRF-0003B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0003B
TRAFO 420-TRF-0003B
1
F
108
VDC
0.10
100 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
SUBSTATION-2 (TRAIN-A AREA) 17
C-231-SWG/MCC-0001A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-2 (Train-A)
1
F
108
VDC
1.00
18
C-231-SWG/MCC-0001B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-2 (Train-A)
1
F
108
VDC
1.00
19
C-231-SWG/MCC-0002A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0002 (BUS A)
400 VAC Switchgear / MCC LV 2A Substation-2 (Train-A)
1
F
108
VDC
1.00
20
C-231-SWG/MCC-0002B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0002 (BUS B)
400 VAC Switchgear / MCC LV 2B Substation-2 (Train-A)
1
F
108
VDC
1.00
21
C-231-SWG/MCC-0003A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0003 (BUS A)
400 VAC Switchgear / MCC LV 3A Substation-2 (Train-A)
1
F
108
VDC
1.00
22
C-231-SWG/MCC-0003B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0003 (BUS B)
400 VAC Switchgear / MCC LV 3B Substation-2 (Train-A)
1
F
108
VDC
1.00
23
C-231-SWG/MCC-0004A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0004 (BUS A)
400 VAC Switchgear / MCC LV 4A Substation-2 (Train-A)
1
F
108
VDC
1.00
24
C-231-SWG/MCC-0004B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0004 (BUS B)
400 VAC Switchgear / MCC LV 4B Substation-2 (Train-A)
1
F
108
VDC
1.00
101 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
25
C-231-TRF-0001A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-TRF-0001A
TRAFO 231-TRF-0001A
1
F
108
VDC
0.10
26
C-231-TRF-0001B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-TRF-0001B
TRAFO 231-TRF-0001B
1
F
108
VDC
0.10
27
C-231-TRF-0002A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-TRF-0002A
TRAFO 231-TRF-0002A
1
F
108
VDC
0.10
28
C-231-TRF-0002B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-TRF-0002B
TRAFO 231-TRF-0002B
1
F
108
VDC
0.10
SUBSTATION-3 (TRAIN-B AREA) 29
C-280-SWG/MCC-0001A
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0001A
6,6 kV Switchgear: 280-SWG-0001A
1
F
108
VDC
1.00
30
C-280-SWG/MCC-0001B
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0001B
6,6 kV Switchgear: 280-SWG-0001B
1
F
108
VDC
1.00
31
C-280-SWG/MCC-0002A
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0002A
400 VAC MCC : 280-MCC-0002A
1
F
108
VDC
1.00
32
C-280-SWG/MCC-0002B
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0002B
400 VAC MCC : 280-MCC-0002B
1
F
108
VDC
1.00
102 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
33
C-280-SWG/MCC-0003A
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0003A
400 VAC MCC : 280-MCC-0003A
1
F
108
VDC
1.00
34
C-280-SWG/MCC-00013
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0003B
400 VAC MCC : 280-MCC-0003B
1
F
108
VDC
1.00
35
C-280-TRF-0001A
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-TRF-0001A
TRAFO 280-TRF-0001A
1
F
108
VDC
0.10
36
C-280-TRF-0001B
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-TRF-0001B
TRAFO 280-TRF-0001B
1
F
108
VDC
0.10
SUBSTATION-4 (UTILITY AREA) 37
C-480-SWG/MCC-0001A
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-SWG/MCC-0001A
6,6 kV Switchgear: 480-SWG-0001A
1
F
108
VDC
1.00
38
C-480-SWG/MCC-0001B
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-SWG/MCC-0001B
6,6 kV Switchgear: 480-SWG-0001B
1
F
108
VDC
1.00
39
C-480-SWG/MCC-0002A
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-SWG/MCC-0002A
400 VAC MCC : 480-MCC-0002A
1
F
108
VDC
1.00
40
C-480-SWG/MCC-0002B
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-SWG/MCC-0002B
400 VAC MCC : 480-MCC-0002B
1
F
108
VDC
1.00
103 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
41
C-480-TRF-0001A
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-TRF-0001A
TRAFO 480-TRF-0001A
1
F
108
VDC
0.10
42
C-480-TRF-0001B
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-TRF-0001B
TRAFO 480-TRF-0001B
1
F
108
VDC
0.10
BATTERY RACK FOR UPS GPF 230 VAC UPS 43
P-420-BAT-0001 A-01/02
420-AC-UPS-0001 A
Substation-1 230 VAC UPS System Feeder A
420-BAT-0001 A
Battery Rack for Substation-1 230 VAC UPS System - Feeder A
1
F
220
VDC
61.04
44
P-420-BAT-0001 B-01/02
420-AC-UPS-0001 B
Substation-1 230 VAC UPS System Feeder B
420-BAT-0001 B
Battery Rack for Substation-1 230VAC UPS System - Feeder B
1
F
220
VDC
61.04
45
P-231-BAT-0001 A
231-AC-UPS-0001 A
Substation-2 230 VAC UPS System Feeder A
231-BAT-0001 A
Battery Rack for Substation-2 230 VAC UPS System - Feeder A
1
F
220
VDC
25.43
46
P-231-BAT-0001 B
231-AC-UPS-0001 B
Substation-2 230VAC UPS System Feeder B
231-BAT-0001 B
Battery Rack for Substation-2 230VAC UPS System - Feeder B
1
F
220
VDC
25.43
47
P-280-BAT-0001 A
280-AC-UPS-0001 A
Substation-3 230VAC UPS System Feeder A
280-BAT-0001 A
Battery Rack for Substation-3 230 VAC UPS System - Feeder A
1
F
220
VDC
27.88
104 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
48
P-280-BAT-0001 B
280-AC-UPS-0001 B
Substation-3 230VAC UPS System Feeder B
280-BAT-0001 B
Battery Rack for Substation-3 230VAC UPS System - Feeder B
1
F
220
VDC
27.88
49
P-480-BAT-0001 A
480-AC-UPS-0001 A
Substation-4 230 VAC UPS System Feeder A
480-BAT-0001 A
Battery Rack for Substation-4 230 VAC UPS System - Feeder A
1
F
220
VDC
27.88
50
P-480-BAT-0001 B
480-AC-UPS-0001 B
Substation-4 230 VAC UPS System Feeder B
480-BAT-0001 B
Battery Rack for Substation-4 230VAC UPS System - Feeder B
1
F
220
VDC
27.88
51
P-410-BAT-0001 A-01/02
410-AC-UPS-0001 A
Control Building 230 VAC UPS System - Feeder A
410-BAT-0001 A
Battery Rack for Control Building 230 VAC UPS System - Feeder A
1
F
220
VDC
53.10
52
P-410-BAT-0001 B-01/02
410-AC-UPS-0001 B
Control Building 230 VAC UPS System - Feeder B
410-BAT-0001 B
Battery Rack for Control Building 230VAC UPS System - Feeder B
1
F
220
VDC
53.10
53
P-800-BAT-0001 A-01/02
800-AC-UPS-0001 A
Infrastructure 230 VAC UPS System Feeder A
800-BAT-0001 A
Battery Rack for Infrastructure 230 VAC UPS System - Feeder A
1
F
220
VDC
53.10
54
P-800-BAT-0001 B-01/02
800-AC-UPS-0001 B
Infrastructure 230 VAC UPS System Feeder B
800-BAT-0001 B
Battery Rack for Infrastructure 230VAC UPS System - Feeder B
1
F
220
VDC
53.10
55
P-211-BAT-0001 A
211-AC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
211-BAT-0001 A
Battery Rack for Central Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
105 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
56
P-211-BAT-0001 B
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-BAT-0001 B
Battery Rack for Central Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
Volt
kW
230 VAC UPS System Central Wellpad (Bus-B) 57
P-212-BAT-0001 A
212-UPS-1004 A
230 VAC UPS System Central Wellpad (Bus-B)
212-BAT-0001 A
Battery Rack for East Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
58
P-212-BAT-0001 B
212-UPS-1004 B
230 VAC UPS System Central Wellpad (Bus-B)
212-BAT-0001 B
Battery Rack for East Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
230 VAC UPS System Central Wellpad (Bus-B) 59 P-710-BAT-1001 A
710-AC-UPS-1001 A
230 VAC UPS System Central Wellpad (Bus-B)
710-BAT-1001 A
Battery Rack for Gas Metering 230 VAC UPS System - Feeder A
1
F
220
VDC
20.44
60 P-710-BAT-1001 B
710-AC-UPS-1001 B
230 VAC UPS System Central Wellpad (Bus-B)
710-BAT-1001 B
Battery Rack for Gas Metering 230VAC UPS System - Feeder B
1
F
220
VDC
20.44
230 VAC UPS System Central Wellpad (Bus-B) 230 VAC UPS System Central Wellpad (Bus-B)
GPF 110 VDC UPS 61
P-420-BAT-0002A
420-DC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
420-BAT-0002 A
Battery Rack for Substation-1 110 VDC UPS System - Feeder A
1
F
110
VDC
20.35
62
P-420-BAT-0002 B
420-DC-UPS-0001 B
230 VAC UPS System Central Wellpad (Bus-B)
420-BAT-0002 B
Battery Rack for Substation-1 110VDC UPS System - Feeder B
1
F
110
VDC
20.35
106 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
63
P-231-BAT-0002 A
231-DC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
231-BAT-0002 A
Battery Rack for Substation-2 110 VDC UPS System - Feeder A
1
F
110
VDC
16.48
64
P-231-BAT-0002 B
231-DC-UPS-0001 B
230 VAC UPS System Central Wellpad (Bus-B)
231-BAT-0002 B
Battery Rack for Substation-2 110VDC UPS System - Feeder B
1
F
110
VDC
16.48
65
P-280-BAT-0002 A
280-DC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
280-BAT-0002 A
Battery Rack for Substation-3 110 VDC UPS System - Feeder A
1
F
110
VDC
12.72
66
P-280-BAT-0002 B
280-DC-UPS-0001 B
230 VAC UPS System Central Wellpad (Bus-B)
280-BAT-0002 B
Battery Rack for Substation-3 110VDC UPS System - Feeder B
1
F
110
VDC
12.72
67
P-480-BAT-0002 A
480-DC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
480-BAT-0002 A
Battery Rack for Substation-4 110 VDC UPS System - Feeder A
1
F
110
VDC
8.85
68
P-480-BAT-0002 B
480-DC-UPS-0001 B
230 VAC UPS System Central Wellpad (Bus-B)
480-BAT-0002 B
Battery Rack for Substation-4 110VDC UPS System - Feeder B
1
F
110
VDC
8.85
230 VAC UPS System Central Wellpad (Bus-B) 230 VAC UPS System Central Wellpad (Bus-B)
WELLPAD 230 VAC UPS 69
P-211-BAT-0001 A
211-AC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
211-BAT-0001 A
Battery Rack for Central Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
70
P-211-BAT-0001 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-BAT-0001 B
Battery Rack for Central Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
107 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
71
P-212-BAT-0001 A
212-AC-UPS-0001 A
East Wellpad 230 VAC UPS System Feeder A
212-BAT-0001 A
Battery Rack for East Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
72
P-212-BAT-0001 B
212-AC-UPS-0001 B
East Wellpad 230VAC UPS System Feeder B
212-BAT-0001 B
Battery Rack for East Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
F
TYPICAL LIGHTING & SMALL POWER CABLES TYPICAL OUTDOOR LIGHTINGS
1
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Distribution Panel Outdoor Lighting
(NOTE-6)
400W Normal HPS Floodlight
3
F
400
VAC
25.60
2
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Distribution Panel Emergency Outdoor Lighting
(NOTE-6)
400W Emergency HPS Floodlight
3
F
400
VAC
0.40
3
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Distribution Panel Outdoor Lighting
(NOTE-6)
150W Normal HPS Wellglass
3
F
400
VAC
0.15
4
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Distribution Panel Outdoor Lighting
(NOTE-6)
250W HPS Streetlight
3
F
400
VAC
0.25
108 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
TYPICAL INDOOR LIGHTING 5
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Distribution Panel Indoor Lighting
(NOTE-6)
2x36 W Normal Fluorescent Light
1
F
230
VAC
0.07
6
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Distribution Panel Emergency Outdoor Lighting
(NOTE-6)
2x36 W Emergency Fluorescent Light (Muster Point)
1
F
230
VAC
0.07
OUTER PERIMETER LIGHTING (For One (1) Loop Perimeter Lighting Cable) 7
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outdoor Lighting and Small Power
(NOTE-6)
250W Normal HPS Floodlight (16 ea)
3
F
400
VAC
4.00
8
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outdoor Lighting and Small Power
(NOTE-6)
250W Normal HPS Floodlight (14 ea)
3
F
394
VAC
3.50
9
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outdoor Lighting and Small Power
(NOTE-6)
250W Normal HPS Floodlight (12 ea)
3
F
394
VAC
3.00
10
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outdoor Lighting and Small Power
(NOTE-6)
250W Normal HPS Floodlight (10 ea)
3
F
392
VAC
2.50
11
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outdoor Lighting and Small Power
(NOTE-6)
250W Normal HPS Floodlight (8 ea)
3
F
391
VAC
2.00
109 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
12
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outdoor Lighting and Small Power
(NOTE-6)
250W Normal HPS Floodlight (6 ea)
3
F
389
VAC
1.50
13
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outdoor Lighting and Small Power
(NOTE-6)
250W Normal HPS Floodlight (4 ea)
3
F
388
VAC
1.00
14
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outdoor Lighting and Small Power
(NOTE-6)
250W Normal HPS Floodlight (2 ea)
3
F
386
VAC
0.50
3
F
400
VAC
4.40
G
TIE-IN BANYU URIP
Distribution Board Helipad
900-DPN-9002-02
Distribution Panel Indoor Lighting & Small Power Guard House-Banyu Urip
1
P-620-LPN-0001
HOLD (NOTE-5)
2
HOLD (NOTE-5)
900-DPN-9002-02
Distribution Panel Indoor Lighting & Small Power Guard House-Banyu Urip
HOLD (NOTE-5)
Indoor Lighting Fluoroscent 2x36 W
1
F
230
VAC
0.07
3
HOLD (NOTE-5)
900-DPN-9002-02
Distribution Panel Indoor Lighting & Small Power Guard House-Banyu Urip
HOLD (NOTE-5)
Air Conditioning
1
F
230
VAC
1.50
110 of 522
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
4
HOLD (NOTE-5)
900-DPN-9002-02
Distribution Panel Indoor Lighting & Small Power Guard House-Banyu Urip
HOLD (NOTE-5)
Outdoor Lighting Floodlight 2x400 W
1
F
230
VAC
1.60
5
HOLD (NOTE-5)
900-DPN-9002-02
Distribution Panel Indoor Lighting & Small Power Guard House-Banyu Urip
HOLD (NOTE-5)
Socket Outlet
1
F
230
VAC
1.20
6
HOLD (NOTE-5)
UPDP826551
UPS Distribution Board PB-24 of Banyu Urip
HOLD (NOTE-5)
PCS System
1
F
230
VAC
5.00
7
HOLD (NOTE-5)
UPDP826551
UPS 230V AC Distribution Board A/B
HOLD (NOTE-5)
PCS System (Redundant)
1
F
230
VAC
0.95
8
HOLD (NOTE-5)
UPDP826551
UPS 230V AC Distribution Board A/B
HOLD (NOTE-5)
CWS Workstation
1
F
230
VAC
0.657
9
HOLD (NOTE-5)
UPDP826551
UPS 230V AC Distribution Board A/B
HOLD (NOTE-5)
Flow Comp System
1
F
230
VAC
0.51
111 of 522
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
Notes : 1. Short Circuit Values (kA) in Column AI are based on ETAP simulated short circuit at each of load end (user) 2. CSA of cable (Smin) are based on the following : ISC x √t
a.) For MV Feeder, Smin of cable determined by formulas : Smin =
k
b.) For 6600 V Motor, Smin determined by Let-through Energy of Protection Device as per Appendix-E c.) For 400 V Motor, Smin determined by Let-through Energy of Protection Device as per Appendix-F d.) For 400 V Feeder, Smin determined by Let-through Energy of Protection Device as per Appendix-G e.) For 230V Cable, Smin determined by Let-through Energy of Protection Device as per Appendix-H (Merlin Gerin C60N for Feeder and C60H for Motor) 3. Sizing cable of switchgear is based on maximum load of switchgear plus 15% contingency and 20% growth allowance of load 112 of 522
3 Ph / 1 Ph
F/M
Volt
kW
GAS DEVELOPMENT
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
4. This is only general calculation of Cable for Space Heater (for motor rated > 5.5 kW). For the complete list of Space Heater cable can be seen in the Doc. No. JTB-SF-E-LST-900-00013~00018, Electrical Cable 5. The Cable Tag Number shall be verifired in the detail engineering phase. 6. The calculation of typical lighting & small power cable in this document are used as an general sizing only. The total number of lighting fixtures will sum in the Electrical MTO.
Legends: Vin (Voltage Source) Vd% (Voltage dropn in %) Vd max %(Voltage drop max in %)
IFL (Full Load current (Amp)) R (Cable resistance (ohm/1000 meter at 90 ºC)) X (Cable reactance (ohm/1000 meter at 50 Hz))
Cos (Load steady state power factor )
Sin φ
Cos β (Load starting power factor)
Lmax (Maximum Cable Length (m))
L (Cable Length (m))
Ist (Motor Starting Current (Amp))
113 of 522
=Sqrt (1-Cos² φ))
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
11 kV Switchgear Substation-1 (Power Generation)
3
F
11,000
11 kV Switchgear Substation-1 (Power Generation)
3
F
11 kV Switchgear Substation-1 (Power Generation)
3
11 / 6.6 kV Transformer A Substation-1 (Power Generation)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
6,500
7,471
1.00
0.87
0.49
N/A
392.14
N/A
2
3/C -
185
mm²
0.1281
0.095
748
0.56
418.8
11,000
VAC
6,500
7,471
1.00
0.87
0.49
N/A
392.14
N/A
2
3/C -
185
mm²
0.1281
0.095
748
0.56
418.8
F
11,000
VAC
3,000
3,448
1.00
0.87
0.49
N/A
180.99
N/A
1
3/C -
150
mm²
0.16
0.098
332
0.56
185.9
3
F
11,000
VAC
11,520
14,400
1.00
0.80
0.60
N/A
755.80
N/A
3
3/C -
300
mm²
0.0799
0.089
1446
0.56
809.7
11 / 6.6 kV Transformer B Substation-1 (Power Generation)
3
F
11,000
VAC
11,520
14,400
1.00
0.80
0.60
N/A
755.80
N/A
3
3/C -
300
mm²
0.0799
0.089
1446
0.56
809.7
11 kV Switchgear Infrastructure
3
F
11,000
VAC
2,223
2,779
1.00
0.80
0.60
N/A
145.86
N/A
1
3/C -
95
mm²
0.247
0.105
263
0.56
147.2
11 / 0.42 kV Transformer Infrastructure
3
F
11,000
VAC
2,400
3,000
1.00
0.80
0.60
N/A
157.46
N/A
1
3/C -
120
mm²
0.197
0.102
298
0.56
166.8
114 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
11 kV Switchgear Central Well Pad Substation
3
F
11,000
11 / 0.42 kV Central Wellpad Transformer
3
F
11 kV Switchgear East Well Pad Substation
3
11 kV Switchgear East Well Pad Substation
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
389
486
1.00
0.80
0.60
N/A
25.53
N/A
1
3/C -
70
mm²
0.343
0.111
220
0.56
123.2
11,000
VAC
384
480
1.00
0.80
0.60
N/A
25.19
N/A
1
3/C -
35
mm²
0.669
0.123
154
0.56
86.2
F
11,000
VAC
384
480
1.00
0.80
0.60
N/A
25.19
N/A
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
3
F
11,000
VAC
389
486
1.00
0.80
0.60
N/A
25.53
N/A
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
11 / 0.42 kV East Wellpad Transformer
3
F
11,000
VAC
384
480
1.00
0.80
0.60
N/A
25.19
N/A
1
3/C -
35
mm²
0.669
0.115
154
0.56
86.2
11 kV Switchgear Sales Gas Metering Substation
3
F
11,000
VAC
166
207
1.00
0.80
0.60
N/A
12.60
N/A
1
3/C -
25
mm²
0.927
0.13
129
0.56
72.2
11 / 0.42 kV Transformer Sales Gas Metering
3
F
11,000
VAC
120
150
1.00
0.80
0.60
N/A
12.60
N/A
1
3/C -
25
mm²
0.927
0.13
129
0.56
72.2
115 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
6.6/0.4 kV Main Transformer
3
F
6,600
6.6/0.4 kV Main Transformer
3
F
6.6/0.4 kV Essential Transformer
3
6.6/0.4 kV Essential Transformer
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1,200
1,500
1.00
0.80
0.60
N/A
131.22
N/A
1
3/C -
95
mm²
0.247
0.099
263
0.56
147.2
6,600
VAC
1,200
1,500
1.00
0.80
0.60
N/A
131.22
N/A
1
3/C -
95
mm²
0.247
0.099
263
0.56
147.2
F
6,600
VAC
1,536
1,920
1.00
0.80
0.60
N/A
167.96
N/A
1
3/C -
150
mm²
0.16
0.093
332
0.56
185.9
3
F
6,600
VAC
1,536
1,920
1.00
0.80
0.60
N/A
167.96
N/A
1
3/C -
150
mm²
0.16
0.093
332
0.56
185.9
6.6 kV Switchgear / MCC MV 1A Substation-2 (Train-A)
3
F
6,600
VAC
4,840
6,050
1.00
0.80
0.60
N/A
529.20
N/A
2
3/C -
300
mm²
0.0799
0.084
964
0.56
539.8
6.6 kV Switchgear / MCC MV 1B Substation-2 (Train-A)
3
F
6,600
VAC
4,840
6,050
1.00
0.80
0.60
N/A
529.20
N/A
2
3/C -
300
mm²
0.0799
0.084
964
0.56
539.8
116 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
6.6/0.4 kV Transformer 1A Substation-2 (Train-A)
3
F
6,600
6.6/0.4 kV Transformer 1B Substation-2 (Train-A)
3
F
6.6/0.4 kV Transformer 2A Substation-2 (Train-A)
3
6.6/0.4 kV Transformer 2B Substation-2 (Train-A)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
960
1,200
1.00
0.80
0.60
N/A
104.97
N/A
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
6,600
VAC
960
1,200
1.00
0.80
0.60
N/A
104.97
N/A
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
F
6,600
VAC
3,840
4,800
1.00
0.80
0.60
N/A
419.89
N/A
2
3/C -
240
mm²
0.0984
0.087
862
0.56
482.7
3
F
6,600
VAC
3,840
4,800
1.00
0.80
0.60
N/A
419.89
N/A
2
3/C -
240
mm²
0.0984
0.087
862
0.56
482.7
6.6 kV Switchgear/MCC Substation-3 (Train-B)
3
F
6,600
VAC
3,842
4,802
1.00
0.80
0.60
N/A
420.10
N/A
2
3/C -
240
mm²
0.0984
0.087
862
0.56
482.7
6.6 kV Switchgear/MCC Substation-3 (Train-B)
3
F
6,600
VAC
3,842
4,802
1.00
0.80
0.60
N/A
420.10
N/A
2
3/C -
240
mm²
0.0984
0.087
862
0.56
482.7
6.6/0.4 kV Transformer A Substation3 (Train-B)
3
F
6,600
VAC
3,456
4,320
1.00
0.80
0.60
N/A
377.90
N/A
2
3/C -
185
mm²
0.1281
0.09
748
0.56
418.8
6.6/0.4 kV Transformer B Substation3 (Train-B)
3
F
6,600
VAC
3,456
4,320
1.00
0.80
0.60
N/A
377.90
N/A
2
3/C -
185
mm²
0.1281
0.09
748
0.56
418.8
117 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
6.6 kV Switchgear / MCC MV 2A Substation-4 (Utility)
3
F
6,600
6.6 kV Switchgear / MCC MV 2B Substation-4 (Utility)
3
F
6.6/0.4 kV Transformer Substation-4 (Utility)
3
6.6/0.4 kV Transformer Substation-4 (Utility)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1,798
2,248
1.00
0.80
0.60
N/A
196.62
N/A
1
3/C -
185
mm²
0.1281
0.09
374
0.56
209.4
6,600
VAC
1,798
2,248
1.00
0.80
0.60
N/A
196.62
N/A
1
3/C -
185
mm²
0.1281
0.09
374
0.56
209.4
F
6,600
VAC
768
960
1.00
0.80
0.60
N/A
83.98
N/A
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
3
F
6,600
VAC
768
960
1.00
0.80
0.60
N/A
83.98
N/A
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
Lean Amine Pump-A (Train A)
3
M
6,600
VAC
200.00
229.89
0.947
0.87
0.49
0.50
21.24
138.03
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.2
Lean Amine Pump-B (Train A)
3
M
6,600
VAC
200.00
229.89
0.947
0.87
0.49
0.50
21.24
138.03
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.2
118 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Lean Amine Pump-A (Train B)
3
M
6,600
Lean Amine Pump-B (Train B)
3
M
HP BWF Start-Up Pump
3
Instrument Air Compressor Package Motor A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
200.00
229.89
0.947
0.87
0.49
0.50
21.24
138.03
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.2
6,600
VAC
200.00
229.89
0.947
0.87
0.49
0.50
21.24
138.03
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.2
M
6,600
VAC
300.00
340.91
0.952
0.88
0.47
0.50
31.33
203.62
1
3/C -
25
mm²
0.927
0.13
129
0.56
72.2
3
M
6,600
VAC
355.00
403.41
0.957
0.88
0.47
0.50
36.87
239.69
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.2
Instrument Air Compressor Package Motor B
3
M
6,600
VAC
355.00
403.41
0.957
0.88
0.47
0.50
36.87
239.69
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.2
Instrument Air Compressor Package Motor C
3
M
6,600
VAC
355.00
403.41
0.957
0.88
0.47
0.50
36.87
239.69
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.2
119 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Inlet Cooler Fan 1
3
M
400
Inlet Cooler Fan 2
3
M
Inlet Cooler Fan 3
3
Inlet Cooler Fan 4
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Inlet Cooler Fan 5
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Inlet Cooler Fan 6
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Inlet Cooler Fan 7
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
120 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Inlet Cooler Fan 8
3
M
400
Produced Water Transfer Pump A
3
M
Produced Water Transfer Pump B
3
Pipeline Produced Water Transfer Pump A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
Pipeline Produced Water Transfer Pump B
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
Skim Oil Pump
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Pipeline Condensate Transfer Pump A
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
121 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Pipeline Condensate Transfer Pump B
3
M
400
VRU Intercooler-A (1st Stage) Fan-1
3
M
VRU Intercooler-A (1st Stage) Fan-2
3
VRU Intercooler-B (1st Stage) Fan-1
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
VRU Intercooler-B (1st Stage) Fan-2
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
VRU Intercooler-A (2nd Stage) Fan-1
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
VRU Intercooler-B (2nd Stage) Fan-1
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
VRU Intercooler-A (3rd Stage) Fan-1
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
122 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
VRU Intercooler-B (3rd Stage) Fan-1
3
M
400
VRU Knockout Pump A
3
M
VRU Knockout Pump B
3
Driver Motor for VRU Compressor
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
3
M
400
VAC
160.00
179.78
0.961
0.89
0.46
0.50
270.01
1755.09
2
3/C -
120
mm²
0.1970
0.0708
480
0.60
288.0
Methanol Injection Pump
3
M
400
VAC
3.00
3.49
0.851
0.86
0.51
0.50
5.92
38.46
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
Condensate Reflux Pump A
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Condensate Reflux Pump B
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
123 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Condensate Cooler Fan-1
3
M
400
Condensate Cooler Fan-2
3
M
Condensate Stabilizer Recycle Liquid Pump
3
Recycle Gas Compressor Cooler Fan-1
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
3
M
400
VAC
3.00
3.49
0.851
0.86
0.51
0.50
5.92
38.46
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
Recycle Gas Compressor Cooler Fan-2
3
M
400
VAC
3.00
3.49
0.851
0.86
0.51
0.50
5.92
38.46
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
EG Circulator Pump A
3
M
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
EG Circulator Pump B
3
M
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
EG Reflux Pump A
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
124 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
EG Reflux Pump B
3
M
400
Produced Water Booster Pump A
3
M
Produced Water Booster Pump B
3
EG Makeup Pump
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
3
M
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
EG Regeneration Overhead Gas Compressor A
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
EG Regeneration Overhead Gas Compressor B
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
EG Regeneration Tower Cooler Fan-1
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
EG Regeneration Tower Cooler Fan-2
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
Glycol Drain Return Pump
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
125 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Propylene Condenser Fan 1
3
M
400
Propylene Condenser Fan 2
3
M
Propylene Condenser Fan 3
3
Propylene Condenser Fan 4
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Propylene Condenser Fan 5
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Propylene Condenser Fan 6
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Propylene Condenser Fan 7
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Propylene Condenser Fan 8
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
126 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Propylene Compressor A (1st Stage) Auxiliary Load
3
M
400
Propylene Compressor A (2nd Stage) Auxiliary Load
3
M
Propylene Compressor B (1st Stage) Auxiliary Load
3
Propylene Compressor B (2nd Stage) Auxiliary Load
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
3
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Lean Solvent Air Cooler-A (AGRU A) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Lean Solvent Air Cooler-A (AGRU A) #2
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Lean Solvent Air Cooler-A (AGRU A) #3
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Lean Solvent Air Cooler-A (AGRU A) #4
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
127 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Lean Solvent Air Cooler-A (AGRU A) #5
3
M
400
Lean Solvent Air Cooler-A (AGRU A) #6
3
M
Lean Solvent Air Cooler-A (AGRU A) #7
3
Lean Solvent Air Cooler-A (AGRU A) #8
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Lean Solvent Air Cooler-B (AGRU A) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Lean Solvent Air Cooler-B (AGRU A) #2
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Lean Solvent Air Cooler-B (AGRU A) #3
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Lean Solvent Air Cooler-B (AGRU A) #4
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Lean Solvent Air Cooler-B (AGRU A) #5
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
128 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Lean Solvent Air Cooler-B (AGRU A) #6
3
M
400
Lean Solvent Air Cooler-B (AGRU A) #7
3
M
Lean Solvent Air Cooler-B (AGRU A) #8
3
Auxiliary for HP Lean Solvent Pump 1 (Train A)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
Auxiliary for HP Lean Solvent Pump 2 (Train A)
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
Auxiliary for HP Lean Solvent Pump 3 (Train A)
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
Reflux Pump-1 A (Train A)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Reflux Pump-1 B (Train A)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Reflux Pump-2 A (Train A)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
129 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Reflux Pump-2 B (Train A)
3
M
400
Drained Solvent Pump (Stand-By) Train A
3
M
Drained Hydrocarbon Pump (StandBy) Train A
3
Auxiliary for LP Lean Solvent Pump 1 (Train A)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Auxiliary for LP Lean Solvent Pump 2 (Train A)
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Auxiliary for LP Lean Solvent Pump 3 (Train A)
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Auxiliary for Regenerator Lean Solvent Pump 1 (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Auxiliary for Regenerator Lean Solvent Pump 2 (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Auxiliary for Regenerator Lean Solvent Pump 3 (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
130 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Reboiler Condensate Pump-1A (Train A)
3
M
400
Reboiler Condensate Pump-1B (Train A)
3
M
Reboiler Condensate Pump-2A (Train A)
3
Reboiler Condensate Pump-2B (Train A)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Overhead Condenser-A (AGRU A) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Overhead Condenser-A (AGRU A) #2
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Overhead Condenser-A (AGRU A) #3
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Overhead Condenser-A (AGRU A) #4
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Overhead Condenser-B (AGRU A) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
131 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Overhead Condenser-B (AGRU A) #2
3
M
400
Overhead Condenser-B (AGRU A) #3
3
M
Overhead Condenser-B (AGRU A) #4
3
AGRU Fresh Solvent Pump A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
AGRU Fresh Solvent Pump B
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Lean Solvent Air Cooler-A (AGRU B) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Solvent Air Cooler-A (AGRU B) #2
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Solvent Air Cooler-A (AGRU B) #3
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
132 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Lean Solvent Air Cooler-A (AGRU B) #4
3
M
400
Lean Solvent Air Cooler-A (AGRU B) #5
3
M
Lean Solvent Air Cooler-A (AGRU B) #6
3
Lean Solvent Air Cooler-A (AGRU B) #7
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Solvent Air Cooler-A (AGRU B) #8
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Solvent Air Cooler-B (AGRU B) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Solvent Air Cooler-B (AGRU B) #2
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Solvent Air Cooler-B (AGRU B) #3
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Solvent Air Cooler-B (AGRU B) #4
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
133 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Lean Solvent Air Cooler-B (AGRU B) #5
3
M
400
Lean Solvent Air Cooler-B (AGRU B) #6
3
M
Lean Solvent Air Cooler-B (AGRU B) #7
3
Lean Solvent Air Cooler-B (AGRU B) #8
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Auxiliary for HP Lean Solvent Pump 1 (Train B)
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
1
3/C -
35
mm²
0.6690
0.0753
122
0.60
73.2
Auxiliary for HP Lean Solvent Pump 2 (Train B)
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
1
3/C -
35
mm²
0.6690
0.0753
122
0.60
73.2
Auxiliary for HP Lean Solvent Pump 3 (Train B)
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
1
3/C -
35
mm²
0.6690
0.0753
122
0.60
73.2
Reflux Pump-1 A (Train B)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Reflux Pump-1 B (Train B)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
134 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Reflux Pump-2 A (Train B)
3
M
400
Reflux Pump-2 B (Train B)
3
M
Drained Solvent Pump (Stand-By) Train B
3
Drained Hydrocarbon Pump (StandBy) Train B
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Auxiliary for LP Lean Solvent Pump 1 (Train B)
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Auxiliary for LP Lean Solvent Pump 2 (Train B)
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Auxiliary for LP Lean Solvent Pump 3 (Train B)
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Auxiliary for Regenerator Lean Solvent Pump 1 (Train B)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Auxiliary for Regenerator Lean Solvent Pump 2 (Train B)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
135 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Auxiliary for Regenerator Lean Solvent Pump 3 (Train B)
3
M
400
Reboiler Condensate Pump-1 A (Train B)
3
M
Reboiler Condensate Pump-1 B (Train B)
3
Reboiler Condensate Pump-2 A (Train B)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Reboiler Condensate Pump-2 B (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Overhead Condenser-A (AGRU B) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Overhead Condenser-A (AGRU B) #2
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Overhead Condenser-A (AGRU B) #3
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Overhead Condenser-A (AGRU B) #4
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
136 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Overhead Condenser-B (AGRU B) #1
3
M
400
Overhead Condenser-B (AGRU B) #2
3
M
Overhead Condenser-B (AGRU B) #3
3
Overhead Condenser-B (AGRU B) #4
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Sales Gas Dehy TEG Circulation Pump A
3
M
400
VAC
132.00
150.00
0.954
0.88
0.47
0.50
226.95
1475.15
1
3/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
Sales Gas Dehy TEG Circulation Pump B
3
M
400
VAC
132.00
150.00
0.954
0.88
0.47
0.50
226.95
1475.15
1
3/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
Sales Gas Dehy TEG Lean Cooler Fan-1
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Sales Gas Dehy TEG Lean Cooler Fan-2
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
137 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Sales Gas Dehy TEG Supply Pump
3
M
400
TEG Drain Vessel Pump
3
M
Sales Gas Compressor Discharge Cooler Fan 1
3
Sales Gas Compressor Discharge Cooler Fan 2
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Sales Gas Compressor A Auxiliary Load
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Sales Gas Compressor B Auxiliary Load
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Wash Water Pump-1 at AGE Absorber (Train A)
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
138 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Wash Water Pump-2 at AGE Absorber (Train A)
3
M
400
Wash Water Pump-3 at AGE Absorber (Train A)
3
M
Regenerator Reflux Pump-1 (Train A)
3
Regenerator Reflux Pump-2 (Train A)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Regenerator Reflux Pump-3 (Train A)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Solvent Sump Pump-A (Train A)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Solvent Sump Pump-B (Train A)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Regenerator Overhead Condenser 1 (Train A)
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
Regenerator Overhead Condenser 2 (Train A)
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
139 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Regenerator Bottoms Pump 1 (Train A)
3
M
400
Regenerator Bottoms Pump 2 (Train A)
3
M
Regenerator Bottoms Pump 3 (Train A)
3
Lean Amine Cooler (Train A) #1
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Lean Amine Cooler (Train A) #2
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Lean Amine Cooler (Train A) #3
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Lean Amine Cooler (Train A) #4
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Lean Amine Cooler (Train A) #5
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Lean Amine Cooler (Train A) #6
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
140 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Lean Amine Cooler (Train A) #7
3
M
400
Lean Amine Cooler (Train A) #8
3
M
Rich Amine Pump-1 at AGE Absorber (Train A)
3
Rich Amine Pump-2 at AGE Absorber (Train A)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
1
3/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
1
3/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
Rich Amine Pump-3 at AGE Absorber (Train A)
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
1
3/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
Fresh Solvent Pump A (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Fresh Solvent Pump B (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Sour Water Pump-1 (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Sour Water Pump-2 (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
141 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Sour Water Pump-3 (Train A)
3
M
400
Wash Water Pump-1 at AGE Absorber (Train B)
3
M
Wash Water Pump-2 at AGE Absorber (Train B)
3
Wash Water Pump-3 at AGE Absorber (Train B)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Regenerator Reflux Pump-1 (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Regenerator Reflux Pump-2 (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Regenerator Reflux Pump-3 (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Solvent Sump Pump-A (Train B)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
142 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Solvent Sump Pump-B (Train B)
3
M
400
Regenerator Overhead Condenser 1 (Train B)
3
M
Regenerator Overhead Condenser 2 (Train B)
3
Regenerator Bottoms Pump-1 (Train B)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
Regenerator Bottoms Pump-2 (Train B)
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
Regenerator Bottoms Pump-3 (Train B)
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
Lean Amine Cooler (Train B) #1
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Amine Cooler (Train B) #2
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Amine Cooler (Train B) #3
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
143 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Lean Amine Cooler (Train B) #4
3
M
400
Lean Amine Cooler (Train B) #5
3
M
Lean Amine Cooler (Train B) #6
3
Lean Amine Cooler (Train B) #7
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Lean Amine Cooler (Train B) #8
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
Rich Amine Pump-A at AGE Absorber (Train B)
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
2
3/C -
120
mm²
0.1970
0.0708
480
0.60
288.0
Rich Amine Pump-B at AGE Absorber (Train B)
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
2
3/C -
120
mm²
0.1970
0.0708
480
0.60
288.0
Rich Amine Pump-C at AGE Absorber (Train B)
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
2
3/C -
120
mm²
0.1970
0.0708
480
0.60
288.0
Sour Water Pump-A (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
144 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Sour Water Pump-B (Train B)
3
M
400
Sour Water Pump-C (Train B)
3
M
Sulfur Transfer Pump A
3
Sulfur Transfer Pump B
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
Claus Air Blower A Auxiliary Load
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Claus Air Blower B Auxiliary Load
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Sour Condensate Pump A
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
Sour Condensate Pump B
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
145 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Sulfur Handling Pump A
3
M
400
Sulfur Handling Pump B
3
M
LP Condensate Pump A
3
LP Condensate Pump B
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Quench Water Pump-A
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
Quench Water Pump-B
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
Wash Water Pump-A at TGU Absorber
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Wash Water Pump-B at TGU Absorber
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
146 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Rich Amine Pump-A at TGU Absorber
3
M
400
Rich Amine Pump-B at TGU Absorber
3
M
Sour Water Drain Return Pump
3
Quench Water Air Cooler #1
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
Quench Water Air Cooler #2
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
BFW Transfer Pump-A
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
BFW Transfer Pump-B
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Steam Condensate Pump A
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
147 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Steam Condensate Pump B
3
M
400
Blowdown Pump A
3
M
Blowdown Pump B
3
LP BFW Pump A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
M
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
LP BFW Pump B
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
Steam Condenser Fan-1
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Steam Condenser Fan-2
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Oxygen Scavenger Tank Mixer Motor
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Neutralization Amine Tank Mixer Motor
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
148 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Phosphate Solution Tank Mixer Motor
3
M
400
Oxygen Scavenger Pump Motor-A
3
M
Oxygen Scavenger Pump Motor-B
3
Neutralization Amine Pump Motor-A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
3
M
400
VAC
1.10
1.29
0.802
0.85
0.53
0.50
2.33
15.14
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Neutralization Amine Pump Motor-B
3
M
400
VAC
1.10
1.29
0.802
0.85
0.53
0.50
2.33
15.14
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Phosphate Solution Pump Motor A
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Phosphate Solution Pump Motor B
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Deaerator Steam Condenser Motor 1
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
Deaerator Steam Condenser Motor 2
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
149 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Raw Water Feed Pump A
3
M
400
Raw Water Feed Pump B
3
M
AGE Off-Gas K.O. Drum Pump-A
3
AGE Off-Gas K.O. Drum Pump-B
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.4
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
TGU Off-Gas K.O. Drum Pump-A
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
TGU Off-Gas K.O. Drum Pump-B
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Thermal Oxidizer Air Blower A Auxiliary Load
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
150 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Thermal Oxidizer Air Blower B Auxiliary Load
3
M
400
Thermal Oxidizer Air Blower C Auxiliary Load
3
M
Thermal Oxidizer Air Blower D Auxiliary Load
3
Thermal Oxidizer Air Blower E Auxiliary Load
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
HP Flare Knockout Drum Condensate Pump A
3
M
400
VAC
90.00
100.00
0.951
0.90
0.44
0.50
151.77
986.53
2
3/C -
95
mm²
0.2470
0.0711
422
0.60
253.2
HP Flare Knockout Drum Condensate Pump B
3
M
400
VAC
90.00
100.00
0.951
0.90
0.44
0.50
151.77
986.53
2
3/C -
95
mm²
0.2470
0.0711
422
0.60
253.2
LP Flare Knockout Drum Condensate Pump A
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
151 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
LP Flare Knockout Drum Condensate Pump B
3
M
400
Diesel Pump
3
M
Firewater Jockey Pump
3
Close Drain Pump
Open Drain Pump
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
1
3/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
M
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
152 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
3
F
400
Battery Charger Emergency Diesel Generator
3
F
400 VAC Switchgear/MCC Well Pad Central
3
Battery Charger Backup Diesel Generator Well Pad Central
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
536
670.00
1.00
0.80
0.60
N/A
967.06
N/A
5
4/C -
300
mm²
0.0799
0.0835
1980
0.60
1188.
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
F
400
VAC
240.00
300.00
1.00
0.80
0.60
N/A
433.01
N/A
2
4/C -
300
mm²
0.0799
0.0835
792
0.60
475.2
3
F
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400 VAC Switchgear/MCC Well Pad Central
3
F
400
VAC
160
200
1.00
0.80
0.60
N/A
288.68
N/A
2
4/C -
150
mm²
0.16
0.0843
542
0.60
325.2
400 VAC Switchgear/MCC Well Pad East
3
F
400
VAC
240.00
300.00
1.00
0.80
0.60
N/A
433.01
N/A
3
4/C -
300
mm²
0.0799
0.0835
1188
0.60
712.8
Battery Charger Backup Diesel Generator Well Pad East
3
F
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
153 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
400 VAC Switchgear/MCC Well Pad East
3
F
400
Battery Charger Backup Diesel Generator Infrastructure
3
F
400 VAC Switchgear/MCC Sales Gas Metering Station
3
Battery Charger Backup Diesel Generator Sales Gas Metering
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
160
200
1.00
0.80
0.60
N/A
288.68
N/A
1
4/C -
240
mm²
0.0984
0.0842
538
0.60
322.8
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
F
400
VAC
100.00
125.00
1.00
0.80
0.60
N/A
180.42
N/A
1
4/C -
185
mm²
0.1281
0.0851
304
0.60
182.4
3
F
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400 VAC Switchgear/MCC Sales Gas Metering Station
3
F
400
VAC
100.00
200.00
1.00
0.80
0.60
N/A
180.42
N/A
1
4/C -
120
mm²
0.197
0.0839
346
0.60
207.6
STG-A Lube Oil Clarifier Driver
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
154 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
STG-A Lube Oil Pump Driver-A
3
M
400
STG-A Lube Oil Pump Driver-B
3
M
STG-A Lube Oil Tank Mist SeparatorA
3
STG-A Lube Oil Tank Mist SeparatorB
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
STG-A Jacking Oil Oump Driver
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
STG-A Bearing Gear Driver
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
STG-B Lube Oil Clarifier Driver
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
STG-B Lube Oil Pump Driver-A
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
155 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
STG-B Lube Oil Pump Driver-B
3
M
400
STG-B Lube Oil Mist Separator-A
3
M
STG-B Lube Oil Mist Separator-B
3
STG-B Jacking Oil Oump Driver
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
STG-B Bearing Gear Driver
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Radiator Fan Essential Generator
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
LCP Power Essential Generator
3
F
400
VAC
18.25
20.28
0.913
0.90
0.44
N/A
32.06
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
Battery Charger Essential Generator
3
F
400
VAC
2.00
2.11
1.000
0.95
0.31
N/A
3.04
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
156 of 522
Amp
ss)
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Transformer Rectifier Unit (GPF Underground Pipeline)-1
3
F
400
Transformer Rectifier Unit (GPF Underground Pipeline)-2
3
F
Transformer Rectifier Unit (Sales Gas Metering Underground Pipeline)
3
230 VAC UPS System - Feeder A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.50
4.38
0.950
0.80
0.60
N/A
6.65
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
400
VAC
3.50
4.38
0.950
0.80
0.60
N/A
6.65
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
F
400
VAC
3.50
4.38
0.950
0.80
0.60
N/A
6.65
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
3
F
400
VAC
64.00
80.00
0.900
0.80
0.60
N/A
128.30
N/A
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
230 VAC UPS System - Feeder B
3
F
400
VAC
64.00
80.00
0.900
0.80
0.60
N/A
128.30
N/A
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
230 VAC UPS System - Bypass
3
F
400
VAC
64.00
80.00
0.900
0.80
0.60
N/A
128.30
N/A
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
110 VDC UPS System - Feeder A
3
F
400
VAC
13.78
17.23
0.900
0.80
0.60
N/A
27.62
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
157 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
110 VDC UPS System - Feeder B
3
F
400
HVAC Package for Substation-1
3
F
HVAC Package for Substation-1
3
HVAC Package for Substation-1
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
13.78
17.23
0.900
0.80
0.60
N/A
27.62
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
400
VAC
113.20
141.50
1.000
0.80
0.60
N/A
204.24
N/A
1
4/C -
240
mm²
0.0984
0.0842
351
0.60
210.6
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
HVAC Package for Substation-1
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
HVAC Auxiliary for Substation 1
3
F
400
VAC
32.20
40.25
1.000
0.80
0.60
N/A
58.10
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Indoor Lighting Substation-1
3
F
400
VAC
14.00
16.47
0.950
0.85
0.53
N/A
25.02
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Outdoor Lighting Substation-1
3
F
400
VAC
46.00
54.12
0.950
0.85
0.53
N/A
82.22
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
158 of 522
Amp
ss)
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Emergency Outdoor Lighting Substation-1
3
F
400
Welding Receptacle #1
3
F
Welding Receptacle #2
3
230 VAC UPS System - Feeder A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.20
8.47
0.950
0.85
0.53
N/A
12.87
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
3
F
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
230 VAC UPS System - Feeder B
3
F
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
230 VAC UPS System - Bypass
3
F
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
110 VDC UPS System - Feeder A
3
F
400
VAC
10.92
13.65
0.900
0.80
0.60
N/A
21.89
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
159 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
110 VDC UPS System - Feeder B
3
F
400
HVAC package for Substation 2
3
F
HVAC package for Substation 2
3
HVAC package for Substation 2
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
10.92
13.65
0.900
0.80
0.60
N/A
21.89
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
146.70
183.38
1.000
0.80
0.60
N/A
264.68
N/A
2
4/C -
120
mm²
0.197
0.0839
480
0.60
288.0
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
3
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
HVAC package for Substation 2
3
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
HVAC Auxiliary for Substation 2
3
F
400
VAC
45.00
56.25
1.000
0.80
0.60
N/A
81.19
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
Distribution Panel Indoor Lighting Substation-2
3
F
400
VAC
11.90
14.00
1.000
0.85
0.53
N/A
20.21
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Outdoor Lighting Substation-2
3
F
400
VAC
93.30
109.76
1.000
0.85
0.53
N/A
158.43
N/A
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
160 of 522
Amp
ss)
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Emergency Outdoor Lighting Substation-2
3
F
400
Welding Receptacle #3
3
F
Welding Receptacle #4
3
Welding Receptacle #7
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
12.50
14.71
1.000
0.85
0.53
N/A
21.23
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
3
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
Welding Receptacle #8
3
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
230 VAC UPS System - Feeder A
3
F
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
230 VAC UPS System - Feeder B
3
F
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
230 VAC UPS System - Bypass
3
F
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
161 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
110 VDC UPS System - Feeder A
3
F
400
110 VDC UPS System - Feeder B
3
F
HVAC package for Substation 3
3
HVAC package for Substation 3
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
8.06
10.08
0.900
0.80
0.60
N/A
16.16
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
8.06
10.08
0.900
0.80
0.60
N/A
16.16
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
F
400
VAC
224.20
280.25
1.000
0.80
0.60
N/A
404.51
N/A
2
4/C -
240
mm²
0.0984
0.0842
702
0.60
421.2
3
F
400
VAC
71.00
88.75
1.000
0.80
0.60
N/A
128.10
N/A
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
HVAC package for Substation 3
3
F
400
VAC
71.00
88.75
1.000
0.80
0.60
N/A
128.10
N/A
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
HVAC Auxiliary for Substation 3
3
F
400
VAC
83.00
103.75
1.000
0.80
0.60
N/A
149.75
N/A
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
Distribution Panel Indoor Lighting Substation-3
3
F
400
VAC
9.80
11.53
1.000
0.85
0.53
N/A
16.64
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
162 of 522
Amp
ss)
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Outdoor Lighting Substation-3
3
F
400
Distribution Panel Emergency Outdoor Lighting Substation-3
3
F
Welding Receptacle #5
3
Welding Receptacle #6
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
58.00
68.24
0.950
0.85
0.53
N/A
103.67
N/A
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
400
VAC
15.00
17.65
1.000
0.85
0.53
N/A
25.47
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
3
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
230 VAC UPS System - Feeder A
3
F
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
230 VAC UPS System - Feeder B
3
F
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
230 VAC UPS System - Bypass
3
F
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
163 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
110 VDC UPS System - Feeder A
3
F
400
110 VDC UPS System - Feeder B
3
F
HVAC package for Substation 4
3
HVAC package for Substation 4
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
5.46
6.83
0.900
0.80
0.60
N/A
10.95
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
5.46
6.83
0.900
0.80
0.60
N/A
10.95
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
F
400
VAC
112.70
132.59
0.900
0.85
0.53
N/A
212.64
N/A
1
4/C -
300
mm²
0.0799
0.0835
396
0.60
237.6
3
F
400
VAC
34.00
40.00
0.900
0.85
0.53
N/A
64.15
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
HVAC package for Substation 4
3
F
400
VAC
34.00
40.00
0.900
0.85
0.53
N/A
64.15
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
HVAC Auxiliary for Substation 4
3
F
400
VAC
45.00
52.94
0.900
0.85
0.53
N/A
84.90
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
Distribution Panel Indoor Lighting Substation-4
3
F
400
VAC
8.00
9.41
1.000
0.85
0.53
N/A
13.58
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Outdoor Lighting Substation-4
3
F
400
VAC
57.35
67.47
1.000
0.85
0.53
N/A
97.39
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
164 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Emergency Outdoor Lighting Substation-4
3
F
400
HVAC package for Instrument Building Train-A
3
F
HVAC package for Instrument Building Train-A
3
HVAC package for Instrument Building Train-A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
5.60
6.59
1.000
0.85
0.53
N/A
9.51
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
HVAC Aux for Instrument Building Train-A
3
F
400
VAC
86.00
107.50
1.000
0.80
0.60
N/A
155.16
N/A
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
HVAC package for Instrument Building Train-B
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
HVAC package for Instrument Building Train-B
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
165 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
HVAC package for Instrument Building Train-B
3
F
400
HVAC Aux for Instrument Building Train-B
3
F
Instrument Panel (Train-A)
3
Instrument Panel (Train-B)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
400
VAC
86.00
107.50
1.000
0.80
0.60
N/A
155.16
N/A
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
F
400
VAC
20.00
23.53
0.900
0.85
0.53
N/A
37.74
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
3
F
400
VAC
20.00
23.53
0.90
0.85
0.53
N/A
37.74
N/A
1
4/C -
25
mm²
0.9270
0.0908
101
0.60
60.6
Distribution Panel Indoor Lighting & Small Power Instrument Building 280A
3
F
400
VAC
2.10
2.47
1.000
0.85
0.53
N/A
3.57
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Indoor Lighting & Small Power Instrument Building 280B
3
F
400
VAC
2.10
2.47
1.000
0.85
0.53
N/A
3.57
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
230 VAC UPS System - Feeder A Control Room
3
F
400
VAC
48.00
60.00
0.900
0.80
0.60
N/A
96.23
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
166 of 522
Amp
ss)
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
230 VAC UPS System - Feeder B Control Room
3
F
400
230 VAC UPS System - Bypass Control Room
3
F
AHU DX
3
AHU DX
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
48.00
60.00
0.900
0.80
0.60
N/A
96.23
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
400
VAC
48.00
60.00
0.900
0.80
0.60
N/A
96.23
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
F
400
VAC
11.00
12.94
0.900
0.85
0.53
N/A
20.75
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
3
F
400
VAC
2.20
2.59
0.900
0.85
0.53
N/A
4.15
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Air Conditioner Cassette Type (Total = 14 unit)
3
F
400
VAC
29.35
34.53
0.900
0.85
0.53
N/A
55.38
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
Electric Duct Heater
3
F
400
VAC
106.03
124.74
0.900
0.85
0.53
N/A
200.05
N/A
2
4/C -
70
mm²
0.343
0.0864
356
0.60
213.6
AC Auxiliary
3
F
400
VAC
6.30
7.41
0.900
0.85
0.53
N/A
11.89
N/A
2
4/C -
6
mm²
3.93
0.098
92
0.60
55.2
Lighting (Indoor Control Room)
3
F
400
VAC
30.20
35.53
0.950
0.85
0.53
N/A
53.98
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
167 of 522
Amp
ss)
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
230 VAC UPS System - Feeder A
3
F
400
230 VAC UPS System - Feeder B
3
F
230 VAC UPS System - Bypass
3
HVAC package for Infrastructure Substation
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
F
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
3
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
HVAC package for Infrastructure Substation
3
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
HVAC package for Infrastructure Substation
3
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
HVAC Auxiliary for Infrastructure Substation
3
F
400
VAC
45.00
56.25
1.000
0.80
0.60
N/A
81.19
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
168 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Indoor Lighting & Small Power Infrastructure Substation
3
F
400
Distribution Panel Outdoor Lighting Infrastructure Substation
3
F
Distribution Panel Emergency Lighting Infrastructure Substation
3
Distribution Panel Indoor Lighting & Small Power Gate House Building
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
6.20
6.53
1.000
0.95
0.31
N/A
9.42
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
41.25
43.42
1.000
0.95
0.31
N/A
62.67
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
F
400
VAC
10.80
11.37
1.000
0.95
0.31
N/A
16.41
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
3
F
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
Distribution Panel Indoor Lighting & Small Power Guard House Building
3
F
400
VAC
3.60
3.79
1.000
0.95
0.31
N/A
5.47
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
169 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Indoor Lighting & Small Power Security Gate House
3
F
400
Distribution Panel Indoor Lighting Administration Building
3
F
Distribution Panel Small Power Administration Building
3
Distribution Panel Indoor Lighting & Small Power Telcom Building
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.20
3.37
1.000
0.95
0.31
N/A
4.86
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
400
VAC
12.40
13.05
1.000
0.95
0.31
N/A
18.84
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
F
400
VAC
35.00
36.84
1.000
0.95
0.31
N/A
53.18
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
3
F
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
Distribution Panel Indoor Lighting Fire Emegency Station
3
F
400
VAC
2.80
2.95
1.000
0.95
0.31
N/A
4.25
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Small Power Fire Emegency Station
3
F
400
VAC
9.50
10.00
1.000
0.95
0.31
N/A
14.43
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Indoor Lighting Office Building
3
F
400
VAC
10.00
10.53
1.000
0.95
0.31
N/A
15.19
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Small Power Office Building
3
F
400
VAC
44.50
46.84
1.000
0.95
0.31
N/A
67.61
N/A
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
Distribution Panel Indoor Lighting Laboratory Building
3
F
400
VAC
7.35
7.74
1.000
0.95
0.31
N/A
11.17
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
170 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Small Power Laboratory Building
3
F
400
Distribution Panel Lighting & Small Power Mosque
3
F
Distribution Panel Indoor Lighting Kitchen & Dining Hall
3
Distribution Panel Indoor Lighting Kitchen & Dining Hall
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
21.00
22.11
1.000
0.95
0.31
N/A
31.91
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
400
VAC
8.00
8.42
1.000
0.95
0.31
N/A
12.15
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
F
400
VAC
6.20
6.53
1.000
0.95
0.31
N/A
9.42
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
3
F
400
VAC
11.00
11.58
1.000
0.95
0.31
N/A
16.71
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
Distribution Panel Lighting & Small Power Laundry Center Building
3
F
400
VAC
6.40
6.74
1.000
0.95
0.31
N/A
9.72
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
Distribution Panel Indoor Lighting Medical Center Building
3
F
400
VAC
8.00
8.42
1.000
0.95
0.31
N/A
12.15
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
Distribution Panel Small Power Medical Center Building
3
F
400
VAC
12.00
12.63
1.000
0.95
0.31
N/A
18.23
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Indoor Lighting Dormitory Operator & Staff
3
F
400
VAC
22.40
23.58
1.000
0.95
0.31
N/A
34.03
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
Distribution Panel Small Power Dormitory Operator & Staff
3
F
400
VAC
99.00
104.21
1.000
0.95
0.31
N/A
150.41
N/A
1
4/C -
300
mm²
0.0799
0.0835
396
0.60
237.6
171 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Indoor Lighting Dormitory Field Superintendent
3
F
400
Distribution Panel Small Power Dormitory Field Superintendent
3
F
Distribution Panel Indoor Lighting Sport Hall & Multipurpose Building
3
Distribution Panel Small Power Sport Hall & Multipurpose Building
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
12.82
13.49
1.000
0.95
0.31
N/A
19.48
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
400
VAC
54.50
57.37
1.000
0.95
0.31
N/A
82.80
N/A
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
F
400
VAC
20.00
21.05
1.000
0.95
0.31
N/A
30.39
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
3
F
400
VAC
60.50
63.68
1.000
0.95
0.31
N/A
91.92
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
Distribution Panel Indoor Lighting Operation Warehouse Building
3
F
400
VAC
30.00
31.58
1.000
0.95
0.31
N/A
45.58
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
Distribution Panel Small Power Operation Warehouse Building
3
F
400
VAC
31.50
33.16
1.000
0.95
0.31
N/A
47.86
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Indoor Lighting & Small Power Vehicle Fuel Station Shelter
3
F
400
VAC
1.70
1.79
1.000
0.95
0.31
N/A
2.58
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Indoor Lighting Operation Maintenance Building
3
F
400
VAC
38.00
40.00
1.000
0.95
0.31
N/A
57.74
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
Distribution Panel Small Power Operation Maintenance Building
3
F
400
VAC
39.00
41.05
1.000
0.95
0.31
N/A
59.25
N/A
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
172 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Indoor Lighting & Small Power Chemical Storage Building
3
F
400
Distribution Panel Air Conditioning Guard House
3
F
Distribution Panel Air Conditioning Gate House
3
Distribution Panel Air Conditioning Gate House
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
20.00
21.05
1.000
0.95
0.31
N/A
30.39
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
400
VAC
3.54
3.73
1.000
0.95
0.31
N/A
5.38
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
F
400
VAC
7.06
7.43
1.000
0.95
0.31
N/A
10.73
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
3
F
400
VAC
7.06
7.43
1.000
0.95
0.31
N/A
10.73
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
7.43
1.000
0.95
0.31
N/A
10.73
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
7.43
1.000
0.95
0.31
N/A
10.73
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Air Conditioning Security Gate House
3
F
400
VAC
10.66
12.54
1.000
0.85
0.53
N/A
18.10
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Air Conditioning Telcom Building
3
F
400
VAC
28.90
34.00
1.000
0.85
0.53
N/A
49.07
N/A
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
173 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Air Conditioning Fire Emergency Station
3
F
400
Distribution Panel Air Conditioning Mosque
3
F
Distribution Panel Air Conditioning Administration Building
3
Distribution Panel Air Conditioning Kitchen & Dinning Hall Building
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
32.00
37.65
1.000
0.85
0.53
N/A
54.34
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
400
VAC
58.00
61.05
1.000
0.95
0.31
N/A
88.12
N/A
1
4/C -
240
mm²
0.0984
0.0842
351
0.60
210.6
F
400
VAC
93.73
110.27
1.000
0.85
0.53
N/A
159.16
N/A
2
4/C -
185
mm²
0.1281
0.0851
608
0.60
364.8
3
F
400
VAC
34.85
41.00
1.000
0.85
0.53
N/A
59.18
N/A
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
Distribution Panel Air Conditioning Medical Center Building
3
F
400
VAC
23.98
28.21
1.000
0.85
0.53
N/A
40.72
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Air Conditioning Laundry Center Building
3
F
400
VAC
19.00
22.35
1.000
0.85
0.53
N/A
32.26
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
Distribution Panel Air Conditioning Dormitory Operator & Staff
3
F
400
VAC
21.51
25.31
1.000
0.85
0.53
N/A
36.53
N/A
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.4
Distribution Panel Air Conditioning Dormitory Field Superintendent
3
F
400
VAC
11.52
13.55
1.000
0.85
0.53
N/A
19.56
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Air Conditioning Sport Hall & Multipurposed Building
3
F
400
VAC
50.63
59.56
1.000
0.85
0.53
N/A
85.97
N/A
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
174 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Air Conditioning Operation Warehouse Building
3
F
400
Distribution Panel Air Conditioning Operation Maintenance Building
3
F
Distribution Panel Air Conditioning Chemical Storage Building
3
Distribution Panel Air Conditioning Operation Warehouse Building
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
66.68
78.45
1.000
0.85
0.53
N/A
113.23
N/A
2
4/C -
240
mm²
0.0984
0.0842
702
0.60
421.2
400
VAC
42.27
49.73
1.000
0.85
0.53
N/A
71.78
N/A
2
4/C -
185
mm²
0.1281
0.0851
608
0.60
364.8
F
400
VAC
53.65
63.12
1.000
0.85
0.53
N/A
91.10
N/A
3
4/C -
150
mm²
0.16
0.0843
813
0.60
487.8
3
F
400
VAC
66.68
78.45
1.000
0.85
0.53
N/A
113.23
N/A
2
4/C -
240
mm²
0.0984
0.0842
702
0.60
421.2
Distribution Panel Air Conditioning Office Building
3
F
400
VAC
37.74
39.73
1.000
0.95
0.31
N/A
57.34
N/A
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
Distribution Panel Air Conditioning Laboratory Building
3
F
400
VAC
40.08
42.19
1.000
0.95
0.31
N/A
60.90
N/A
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
Potable Water Pump
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Close Drain Pump
3
M
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
175 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
230 VAC UPS System - Feeder A
3
F
400
230 VAC UPS System - Feeder B
3
F
230 VAC UPS System - Bypass
3
HVAC package for Central Wellpad Substation
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
3
F
400
VAC
27.00
31.76
1.000
0.85
0.53
N/A
45.85
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
HVAC package for Central Wellpad Substation
3
F
400
VAC
27.00
31.76
1.000
0.85
0.53
N/A
45.85
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
HVAC package for Central Wellpad Substation
3
F
400
VAC
27.00
31.76
1.000
0.85
0.53
N/A
45.85
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
HVAC Auxiliry for Central Wellpad Substation
3
F
400
VAC
33.00
38.82
1.000
0.85
0.53
N/A
56.04
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
176 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Flare Package
3
F
400
Distribution Panel Outdoor Lighting Central Wellpad
3
F
Distribution Panel Indoor Lighting Central Wellpad
3
Distribution Panel Emergency Outdoor Lighting Central Wellpad
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.00
3.49
1.000
0.86
0.51
N/A
5.04
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
24.22
30.28
1.000
0.80
0.60
N/A
43.70
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
F
400
VAC
3.70
4.63
1.000
0.80
0.60
N/A
6.68
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
3
F
400
VAC
7.27
9.08
1.000
0.80
0.60
N/A
13.11
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Potable Water Pump
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Close Drain Pump
3
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
230 VAC UPS System - Feeder A
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
177 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
230 VAC UPS System - Feeder B
3
F
400
230 VAC UPS System - Bypass
3
F
HVAC package for East Wellpad Substation
3
HVAC package for East Wellpad Substation
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
F
400
VAC
27.00
31.76
1.000
0.85
0.53
N/A
45.85
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
3
F
400
VAC
27.00
31.76
1.000
0.85
0.53
N/A
45.85
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
HVAC package for East Wellpad Substation
3
F
400
VAC
27.00
31.76
1.000
0.85
0.53
N/A
45.85
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
HVAC package for East Wellpad Substation
3
F
400
VAC
33.00
38.82
1.000
0.85
0.53
N/A
56.04
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Flare Package
3
F
400
VAC
3.00
3.49
1.000
0.86
0.51
N/A
5.04
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Outdoor Lighting East Wellpad
3
F
400
VAC
36.00
45.00
1.000
0.80
0.60
N/A
64.95
N/A
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.2
178 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Indoor Lighting East Wellpad
3
F
400
Distribution Panel Emergency Outdoor Lighting East Wellpad
3
F
Potable Water Pump
3
Instrument Air Compressor
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.70
4.63
1.000
0.80
0.60
N/A
6.68
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
9.60
12.00
1.000
0.80
0.60
N/A
17.32
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
Gas Metering 230VAC UPS System Feeder A
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Gas Metering 230VAC UPS System Feeder B
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Gas Metering 230VAC UPS System Bypass
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
179 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Metering Station Building HVAC
3
F
400
Metering Station Building HVAC
3
F
Metering Station Building HVAC
3
Metering Station Building HVAC Auxiliary
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
5.20
6.50
1.000
0.80
0.60
N/A
9.38
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
400
VAC
5.20
6.50
1.000
0.80
0.60
N/A
9.38
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
F
400
VAC
5.20
6.50
1.000
0.80
0.60
N/A
9.38
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
3
F
400
VAC
5.20
6.50
1.000
0.80
0.60
N/A
9.38
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Indoor Lighting East Wellpad
3
F
400
VAC
16.43
19.33
1.000
0.85
0.53
N/A
27.90
N/A
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.6
Metering Station Building Socket Outlet
3
F
400
VAC
5.00
6.25
1.000
0.80
0.60
N/A
9.02
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
Distribution Panel Indoor Lighting East Wellpad
3
F
400
VAC
29.00
36.25
1.000
0.80
0.60
N/A
52.32
N/A
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.6
Distribution Panel Emergency Outdoor Lighting East Wellpad
3
F
400
VAC
7.00
8.24
1.000
0.85
0.53
N/A
11.89
N/A
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.6
180 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Metering Station Welding Outlet
3
F
400
Motor Space Heater (Continuous) GPF (Qty=73 ea)
1
M
Motor Space Heater (Intermittent) GPF (Qty=6 ea)
1
Motor Space Heater (Stand-by) GPF (Qty=105 ea) Space Heater for Close Drain Pump Central Wellpad
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
230
VAC
0.23
0.23
0.95
0.98
0.20
0.50
1.07
6.98
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
M
230
VAC
0.23
0.23
0.95
0.98
0.20
0.50
1.07
6.98
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
M
230
VAC
0.23
0.23
0.95
0.98
0.20
0.50
1.07
6.98
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
M
230
VAC
0.20
0.20
0.95
1.00
0.00
0.50
0.92
5.95
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
181 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Space Heater for Close Drain Pump East Wellpad
1
M
230
STG-A Space Heater
1
M
STG-B Space Heater
1
UCP STG-A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.20
0.21
1.00
0.95
0.31
0.50
0.92
5.95
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
230
VAC
2.25
2.25
0.900
1.00
0.00
0.50
10.87
70.65
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
M
230
VAC
2.25
2.25
0.900
1.00
0.00
0.50
10.87
70.65
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Battery Charger STG-A
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
UCP Essential Generator
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Battery Charger Essential Generator
1
F
210
VAC
1.00
1.05
1.000
0.95
0.31
N/A
5.01
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Motor Charging VCB for 420-SWG-0001
1
M
210
VAC
1.80
1.80
0.900
1.00
0.00
0.50
9.52
61.90
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
182 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Motor Charging VCB for 420-SWG-0002
1
M
210
PCS REMOTE I/O
1
F
HVAC CONTROL PANEL
1
ECMS NETWORK SERVER
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.00
3.00
0.900
1.00
0.00
0.50
15.87
103.17
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
ECMS PRINTER
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
LCP STG-A
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
SIS REMOTE I/O
1
F
210
VAC
0.70
0.70
0.900
1.00
0.00
N/A
3.70
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F&G REMOTE I/O
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
LOAD SHEDDING PANEL-A
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
183 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Emergency Outdoor Lighting Substation-1
1
F
210
TELECOM CABINET
1
F
HP BOILER CABINET
1
LP BOILER CABINET
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.20
7.20
0.900
1.00
0.00
N/A
38.10
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
MAIN ECMS-A PANEL
1
F
210
VAC
1.50
1.50
0.900
1.00
0.00
N/A
7.94
N/A
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
PAGA CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
FACP CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
UCP STG-B
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
184 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Battery Charger STG-B
1
F
210
UCP Emergency Diesel Generator
1
F
Battery Charger Emergency Generator
1
Motor Charging VCB for 420-SWG-0003
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.50
0.60
0.842
0.84
0.00
N/A
3.37
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
M
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Motor Charging VCB for 420-SWG-0004
1
M
210
VAC
0.50
0.50
0.900
1.00
0.00
0.50
2.65
17.20
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Motor Charging VCB for 420-SWG-0005
1
M
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PCS REMOTE I/O
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
SIS REMOTE I/O
1
F
210
VAC
0.70
0.70
0.900
1.00
0.00
N/A
3.70
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F&G REMOTE I/O
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
185 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
ECMS OPC SERVER
1
F
210
LCP STG-B
1
F
LCP ESSENTIAL GEN
1
ECMS WORK STATION
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
ECMS NETWORK SWITCH
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
LOAD SHEDDING PANEL-B
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
TELECOM CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
HP BOILER CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
LP BOILER CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
186 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
MAIN ECMS-B PANEL
1
F
210
PAGA CABINET
1
F
Motor Charging VCB : 231-SWG-0001
1
Motor Charging ACB : 231-SWG-0002
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.50
1.50
0.900
1.00
0.00
N/A
7.94
N/A
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
M
210
VAC
2.20
2.20
0.900
1.00
0.00
0.50
11.64
75.66
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
1
M
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
HVAC CONTROL PANEL
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
187 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
SIS REMOTE I/O PANEL
1
F
210
F&G REMOTE I/O PANEL
1
F
PAGA CABINET
1
VRU LCP
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
RECYLE GAS COMPRESSOR LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
HP/LP A FLARE LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
SALES GAS COMPRESSOR LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
TEG LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
188 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
SRU LCP
1
F
210
TGU LCP
1
F
UPS DB at Instrument Building 280A-B-9001
1
Motor Charging VCB : 231-SWG-0003
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
F
210
VAC
3.50
3.50
0.900
1.00
0.00
N/A
18.52
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
1
M
210
VAC
0.50
0.50
0.900
1.00
0.00
0.50
2.65
17.20
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
VRU LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
ECMS WORKSTATION
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
189 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
NETWORK SWITCH
1
F
210
Distribution Panel Emergency Outdoor Lighting Substation-2
1
F
SIS REMOTE I/O PANEL
1
Motor Charging VCB : 231-SWG-0004
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
8.80
8.80
0.900
1.00
0.00
N/A
46.56
N/A
1
2/C -
35
mm²
0.6690
0.0753
122
0.60
73.2
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
M
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PAGA CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
FACP PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
RECYLE GAS COMPRESSOR LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
190 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
SALES GAS COMPRESSOR LCP
1
F
210
TEG LCP
1
F
SRU LCP
1
TGU LCP
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
Motor Charging VCB 280-SWG-0001
1
M
210
VAC
1.40
1.40
0.900
1.00
0.00
0.50
7.41
48.15
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Motor Charging ACB : 280-SWG-0002
1
M
210
VAC
0.50
0.50
0.900
1.00
0.00
0.50
2.65
17.20
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
HVAC CONTROL PANEL
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
191 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
ECMS PANEL
1
F
210
PAGA CABINET
1
F
SIS REMOTE I/O PANEL (280A-B9001)
1
F&G REMOTE I/O PANEL
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
NETWORK SWITCH
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
UPS DB at Instrument Building 280B-B-9001
1
F
210
VAC
3.50
3.50
0.900
1.00
0.00
N/A
18.52
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Motor Charging VCB : 280-SWG-0003
1
M
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
192 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
SIS REMOTE I/O PANEL (280A-B9001)
1
F
210
F&G REMOTE I/O PANEL
1
F
ECMS PANEL
1
ECMS WORKSTATION
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
NETWORK SWITCH
1
F
210
VAC
0.80
0.80
0.900
1.00
0.00
N/A
4.23
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
Distribution Panel Emergency Outdoor Lighting Substation-3
1
F
210
VAC
10.40
10.40
0.900
1.00
0.00
N/A
55.03
N/A
1
2/C -
35
mm²
0.6690
0.0753
122
0.60
73.2
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PAGA CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
193 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
FACP PANEL
1
F
210
Motor Charging VCB 480-SWG-0001
1
M
Motor Charging ACB : 480-SWG-0002
1
PCS REMOTE I/O PANEL
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
2.00
2.00
0.900
1.00
0.00
0.50
10.58
68.78
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
M
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
HVAC CONTROL PANEL
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
ECMS PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
INSTRUMENT AIR COMPRESSORA LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
INSTRUMENT AIR COMPRESSORB LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
194 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
INSTRUMENT AIR COMPRESSORC LCP
1
F
210
SIS REMOTE I/O PANEL
1
F
F&G REMOTE I/O PANEL
1
Distribution Panel Emergency Outdoor Lighting Substation-4
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
4.00
4.00
0.900
1.00
0.00
N/A
21.16
N/A
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PAGA CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
NETWORK SWITCH
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
FACP PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
195 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
AIR MANAGER LCP
1
F
210
SIS REMOTE I/O PANEL
1
F
F&G REMOTE I/O PANEL
1
ECMS PANEL
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS WORKSTATION
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
FACP PANEL
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
INSTRUMENT AIR DRYER-A LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
INSTRUMENT AIR DRYER-B LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
INSTRUMENT AIR DRYER-C LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
196 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
FIRE WATER PANEL BATTERY CHARGER-A
1
F
210
FIRE WATER PANEL BATTERY CHARGER-B
1
F
PCS REMOTE I/O PANEL
1
TELECOM CABINET
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PAGA CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PCS SYSTEM CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
SIS SYSTEM CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
197 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
F&G SYSTEM CABINET
1
F
210
FACP PANEL
1
F
LDS SYSTEM COMPUTER
1
OFFICE APPLICATION COMPUTER
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
MM SERVER
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PROCESS MONITORING COMP
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
RTS SERVER
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
FO BACKBONE PATCH PANEL
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
MOM SYSTEM CABINET 2
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
198 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
SOE WORKSTATION
1
F
210
F&G MONITOR WORKSTATION
1
F
FIRE STATION MONITOR
1
HVAC CONTROL PANEL
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.60
0.60
0.900
1.00
0.00
N/A
3.17
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS-A PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS-A WORKSTATION
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
CWE SYSTEM CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
MOM SYSTEM CABINET 1
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
PAGA CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
199 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
OPERATOR TRAINING SYSTEM CABINET
1
F
210
PCS SYSTEM CABINET
1
F
SIS SYSTEM CABINET
1
F&G SYSTEM CABINET
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.60
0.60
0.900
1.00
0.00
N/A
3.17
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
FACP PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
CCTV SERVER
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
EDMS SERVER
1
F
210
VAC
1.30
1.30
0.900
1.00
0.00
N/A
6.88
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
MIS BACK-UP SERVER
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
200 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
APMS SERVER
1
F
210
EPMS SERVER
1
F
HISTORIAN OPC SERVER
1
PRINTER
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
1.30
1.30
0.900
1.00
0.00
N/A
6.88
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
1
F
210
VAC
0.69
0.69
0.900
1.00
0.00
N/A
3.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
FO BACKBONE PATCH PANEL
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
CCTV SYSTEM
1
F
210
VAC
1.50
1.50
0.900
1.00
0.00
N/A
7.94
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
CCTV MONITOR
1
F
210
VAC
0.80
0.80
0.900
1.00
0.00
N/A
4.23
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PAGA STATION
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PCS PLASMA TV
1
F
210
VAC
1.87
1.87
0.900
1.00
0.00
N/A
9.87
N/A
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
201 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
MOM SYSTEM CABINET 2
1
F
210
NETWORK SWITCH
1
F
SIS CONSOLE
1
F&G CONSOLE
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
210
VAC
1.60
1.60
0.900
1.00
0.00
N/A
8.47
N/A
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
F
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS-B PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
PCS EWS
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ESD/F&G EWS
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
AMS EWS
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
CWE SYSTEM CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
202 of 522
Amp
A
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
MOM SYSTEM CABINET 1
1
F
210
OPERATOR TRAINING SYSTEM CABINET
1
F
PAGA CABINET
1
Distribution Panel Emergency Outdoor Lighting Central Wellpad
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
210
VAC
0.60
0.60
0.900
1.00
0.00
N/A
3.17
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
1
F
210
VAC
10.80
10.80
0.900
1.00
0.00
N/A
57.14
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
11 kV Switchgear Infrastructure Substation (BUS A)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Back-Up Genset Charger
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400 VAC Switchgear/MCC Infrastructure Substation (BUS A)
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
203 of 522
Amp
B
B
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
ECMS Workstation
1
F
210
F&G REMOTE I/O PANEL
1
F
Telecom UPS DB
1
Back-Up Genset Charger
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
F
210
VAC
13.40
13.40
0.900
1.00
0.00
N/A
70.90
N/A
1
2/C -
35
mm²
0.6690
0.0753
122
0.60
73.2
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400 VAC Switchgear/MCC Infrastructure Substation (BUS B)
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
11 kV Switchgear Infrastructure Substation (BUS B)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
NETWORK SWITCH
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
204 of 522
Amp
A
A
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
F&G REMOTE I/O PANEL
1
F
210
Telecom Cabinet
1
F
RTU/SCADA Cabinet
1
Flow Comp Cabinet
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400 VAC Switchgear/MCC Well Pad Central (BUS A)
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS PC
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
11 kV Switchgear Central Well Pad Substation (BUS A)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
205 of 522
Amp
B
B
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Back-Up Genset Charger
1
F
210
Telecom Cabinet
1
F
RTU/SCADA Cabinet
1
Flow Comp Cabinet
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400 VAC Switchgear/MCC Well Pad Central (BUS B)
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
11 kV Switchgear Central Well Pad Substation (BUS B)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Distribution Panel Emergency Outdoor Lighting Central Wellpad
1
F
210
VAC
5.60
5.60
0.900
1.00
0.00
N/A
29.63
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
206 of 522
Amp
A
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
FLARE PANEL
1
F
210
HVAC CONTROL PANEL
1
F
Telecom Cabinet
1
RTU/SCADA Cabinet
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Flow Comp Cabinet
1
F
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400 VAC Switchgear/MCC East Well Pad Substation (BUS A)
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS PC
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
207 of 522
Amp
A
B
B
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
11 kV Switchgear East Well Pad Substation (BUS A)
1
F
210
Back-Up Genset Charger
1
F
Telecom Cabinet
1
RTU/SCADA Cabinet
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Flow Comp Cabinet
1
F
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400 VAC Switchgear/MCC East Well Pad Substation (BUS B)
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
11 kV Switchgear East Well Pad Substation (BUS B)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
208 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Distribution Panel Emergency Outdoor Lighting East Wellpad
1
F
210
FLARE PANEL
1
F
HVAC CONTROL PANEL
1
Telecom Cabinet
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
9.60
9.60
0.900
1.00
0.00
N/A
50.79
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
RTU/SCADA Cabinet
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Flow Computer System
1
F
210
VAC
1.80
1.80
0.900
1.00
0.00
N/A
9.52
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
Laser Jet Printer
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Sales Gas Ccmputer
1
F
210
VAC
0.70
0.70
0.900
1.00
0.00
N/A
3.70
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
209 of 522
Amp
A
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
ECMS PC
1
F
210
ECMS Panel
1
F
Back-Up Genset Charger
1
400 VAC Switchgear/MCC Sales Gas Metering Substation (BUS A)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
11 kV Switchgear Sales Gas Metering Substation (BUS A)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Telecom Cabinet
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
RTU/SCADA Cabinet
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Dot Maztrix Printer
1
F
210
VAC
0.10
0.10
0.900
1.00
0.00
N/A
0.53
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
210 of 522
Amp
B
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Flow Computer System
1
F
210
ECMS Panel
1
F
Back-Up Genset UCP
1
Distribution Panel Emergency Outdoor Lighting Sales Gas Metering
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.80
1.80
0.900
1.00
0.00
N/A
9.52
N/A
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
210
VAC
4.00
4.00
0.900
1.00
0.00
N/A
21.16
N/A
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
HVAC CONTROL PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
400 VAC Switchgear/MCC Sales Gas Metering Substation (BUS B)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
11 kV Switchgear Sales Gas Metering Substation (BUS B)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
211 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
A
11 kV Switchgear: 420-SWG-0001A
1
F
108
B
11 kV Switchgear: 420-SWG-0001B
1
F
A
400 VAC MCC : 420-MCC-0003A
1
B
400 VAC MCC : 420-MCC-0003B
A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400 VAC MCC : 420-MCC-0005A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
A
400 VAC MCC : 420-MCC-0004A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
B
400 VAC MCC : 420-MCC-0004B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
212 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
B
400 VAC MCC : 420-MCC-0005B
1
F
108
A
6,6 kV Switchgear: 420-SWG-0002A
1
F
B
6,6 kV Switchgear: 420-SWG-0002B
1
TRAFO 420-TRF-0001A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
TRAFO 420-TRF-0001B
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
TRAFO 420-TRF-0002A
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
TRAFO 420-TRF-0002B
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
TRAFO 420-TRF-0003A
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
TRAFO 420-TRF-0003B
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
213 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
6.6 kV Switchgear / MCC MV 1A Substation-2 (Train-A)
1
F
108
6.6 kV Switchgear / MCC MV 1B Substation-2 (Train-A)
1
F
400 VAC Switchgear / MCC LV 2A Substation-2 (Train-A)
1
400 VAC Switchgear / MCC LV 2B Substation-2 (Train-A)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400 VAC Switchgear / MCC LV 3A Substation-2 (Train-A)
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400 VAC Switchgear / MCC LV 3B Substation-2 (Train-A)
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400 VAC Switchgear / MCC LV 4A Substation-2 (Train-A)
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
400 VAC Switchgear / MCC LV 4B Substation-2 (Train-A)
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
214 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
TRAFO 231-TRF-0001A
1
F
108
TRAFO 231-TRF-0001B
1
F
TRAFO 231-TRF-0002A
1
TRAFO 231-TRF-0002B
A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
6,6 kV Switchgear: 280-SWG-0001A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
B
6,6 kV Switchgear: 280-SWG-0001B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
A
400 VAC MCC : 280-MCC-0002A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
B
400 VAC MCC : 280-MCC-0002B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
215 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
A
400 VAC MCC : 280-MCC-0003A
1
F
108
B
400 VAC MCC : 280-MCC-0003B
1
F
TRAFO 280-TRF-0001A
1
TRAFO 280-TRF-0001B
A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
1
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
6,6 kV Switchgear: 480-SWG-0001A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
B
6,6 kV Switchgear: 480-SWG-0001B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
A
400 VAC MCC : 480-MCC-0002A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
B
400 VAC MCC : 480-MCC-0002B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
216 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
TRAFO 480-TRF-0001A
1
F
108
TRAFO 480-TRF-0001B
1
F
Battery Rack for Substation-1 230 VAC UPS System - Feeder A
1
Battery Rack for Substation-1 230VAC UPS System - Feeder B
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
220
VDC
61.04
61.04
0.800
1.00
0.00
N/A
346.80
N/A
2
2/C -
185
mm²
0.1281
0.0720
608
0.60
364.8
1
F
220
VDC
61.04
61.04
0.800
1.00
0.00
N/A
346.80
N/A
2
2/C -
185
mm²
0.1281
0.0720
608
0.60
364.8
Battery Rack for Substation-2 230 VAC UPS System - Feeder A
1
F
220
VDC
25.43
25.43
0.800
1.00
0.00
N/A
144.50
N/A
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
Battery Rack for Substation-2 230VAC UPS System - Feeder B
1
F
220
VDC
25.43
25.43
0.800
1.00
0.00
N/A
144.50
N/A
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
Battery Rack for Substation-3 230 VAC UPS System - Feeder A
1
F
220
VDC
27.88
27.88
0.800
1.00
0.00
N/A
158.40
N/A
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
217 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Battery Rack for Substation-3 230VAC UPS System - Feeder B
1
F
220
Battery Rack for Substation-4 230 VAC UPS System - Feeder A
1
F
Battery Rack for Substation-4 230VAC UPS System - Feeder B
1
Battery Rack for Control Building 230 VAC UPS System - Feeder A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
27.88
27.88
0.800
1.00
0.00
N/A
158.40
N/A
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
220
VDC
27.88
27.88
0.800
1.00
0.00
N/A
158.40
N/A
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
F
220
VDC
27.88
27.88
0.800
1.00
0.00
N/A
158.40
N/A
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
1
F
220
VDC
53.10
53.10
0.800
1.00
0.00
N/A
301.70
N/A
2
2/C -
150
mm²
0.1600
0.0712
542
0.60
325.2
Battery Rack for Control Building 230VAC UPS System - Feeder B
1
F
220
VDC
53.10
53.10
0.800
1.00
0.00
N/A
301.70
N/A
2
2/C -
150
mm²
0.1600
0.0712
542
0.60
325.2
Battery Rack for Infrastructure 230 VAC UPS System - Feeder A
1
F
220
VDC
53.10
53.10
0.800
1.00
0.00
N/A
301.70
N/A
2
2/C -
150
mm²
0.1600
0.0712
542
0.60
325.2
Battery Rack for Infrastructure 230VAC UPS System - Feeder B
1
F
220
VDC
53.10
53.10
0.800
1.00
0.00
N/A
301.70
N/A
2
2/C -
150
mm²
0.1600
0.0712
542
0.60
325.2
Battery Rack for Central Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
218 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Battery Rack for Central Wellpad 230VAC UPS System - Feeder B
1
F
220
Battery Rack for East Wellpad 230 VAC UPS System - Feeder A
1
F
Battery Rack for East Wellpad 230VAC UPS System - Feeder B
1
Battery Rack for Gas Metering 230 VAC UPS System - Feeder A
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
1
F
220
VDC
20.44
20.44
0.800
1.00
0.00
N/A
116.11
N/A
1
2/C -
95
mm² 0.2470 0.0711
211
0.60
126.6
Battery Rack for Gas Metering 230VAC UPS System - Feeder B
1
F
220
VDC
20.44
20.44
0.800
1.00
0.00
N/A
116.11
N/A
1
2/C -
95
mm² 0.2470 0.0711
211
0.60
126.6
Battery Rack for Substation-1 110 VDC UPS System - Feeder A
1
F
110
VDC
20.35
20.35
0.800
1.00
0.00
N/A
231.20
N/A
1
2/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
Battery Rack for Substation-1 110VDC UPS System - Feeder B
1
F
110
VDC
20.35
20.35
0.800
1.00
0.00
N/A
231.20
N/A
1
2/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
219 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Battery Rack for Substation-2 110 VDC UPS System - Feeder A
1
F
110
Battery Rack for Substation-2 110VDC UPS System - Feeder B
1
F
Battery Rack for Substation-3 110 VDC UPS System - Feeder A
1
Battery Rack for Substation-3 110VDC UPS System - Feeder B
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
16.48
16.48
0.800
1.00
0.00
N/A
187.30
N/A
1
2/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
110
VDC
16.48
16.48
0.800
1.00
0.00
N/A
187.30
N/A
1
2/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
F
110
VDC
12.72
12.72
0.800
1.00
0.00
N/A
144.50
N/A
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
1
F
110
VDC
12.72
12.72
0.800
1.00
0.00
N/A
144.50
N/A
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
Battery Rack for Substation-4 110 VDC UPS System - Feeder A
1
F
110
VDC
8.85
8.85
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Battery Rack for Substation-4 110VDC UPS System - Feeder B
1
F
110
VDC
8.85
8.85
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Battery Rack for Central Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Battery Rack for Central Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
220 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Battery Rack for East Wellpad 230 VAC UPS System - Feeder A
1
F
220
Battery Rack for East Wellpad 230VAC UPS System - Feeder B
1
F
400W Normal HPS Floodlight
3
400W Emergency HPS Floodlight
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
F
400
VAC
25.60
26.12
0.950
0.98
0.20
N/A
39.69
N/A
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
3
F
400
VAC
0.40
0.41
0.950
0.98
0.20
N/A
0.62
N/A
1
4/C -
2.5
mm²
9.45
0.1086
29
0.60
17.4
150W Normal HPS Wellglass
3
F
400
VAC
0.15
0.15
0.950
0.98
0.20
N/A
0.23
N/A
1
4/C -
2.5
mm²
9.45
0.1086
29
0.60
17.4
250W HPS Streetlight
3
F
400
VAC
0.25
0.26
0.950
0.98
0.20
N/A
0.39
N/A
1
4/C -
2.5
mm²
9.45
0.1086
29
0.60
17.4
221 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
2x36 W Normal Fluorescent Light
1
F
230
2x36 W Emergency Fluorescent Light (Muster Point)
1
F
250W Normal HPS Floodlight (16 ea)
3
250W Normal HPS Floodlight (14 ea)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.07
0.07
0.900
1.00
0.00
N/A
0.35
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
230
VAC
0.07
0.07
0.900
1.00
0.00
N/A
0.35
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
400
VAC
4.00
4.00
0.900
1.00
0.00
N/A
6.42
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
3
F
394
VAC
3.50
3.50
0.900
1.00
0.00
N/A
5.70
N/A
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.6
250W Normal HPS Floodlight (12 ea)
3
F
394
VAC
3.00
3.00
0.900
1.00
0.00
N/A
4.89
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
250W Normal HPS Floodlight (10 ea)
3
F
392
VAC
2.50
2.50
0.900
1.00
0.00
N/A
4.09
N/A
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.6
250W Normal HPS Floodlight (8 ea)
3
F
391
VAC
2.00
2.00
0.900
1.00
0.00
N/A
3.28
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
222 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
250W Normal HPS Floodlight (6 ea)
3
F
389
250W Normal HPS Floodlight (4 ea)
3
F
250W Normal HPS Floodlight (2 ea)
3
Distribution Panel Indoor Lighting & Small Power Guard House-Banyu Urip
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.50
1.50
0.900
1.00
0.00
N/A
2.47
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
388
VAC
1.00
1.00
0.900
1.00
0.00
N/A
1.65
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
386
VAC
0.50
0.50
0.900
1.00
0.00
N/A
0.83
N/A
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
3
F
400
VAC
4.40
5.00
0.912
0.88
0.47
N/A
7.91
N/A
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.4
Indoor Lighting Fluoroscent 2x36 W
1
F
230
VAC
0.07
0.09
0.900
0.80
0.60
N/A
0.43
N/A
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
Air Conditioning
1
F
230
VAC
1.50
1.88
0.900
0.80
0.60
N/A
9.06
N/A
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
223 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
To Description
3 Ph / 1 Ph
F/M
Outdoor Lighting Floodlight 2x400 W
1
F
230
Socket Outlet
1
F
PCS System
1
PCS System (Redundant)
Volt
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.60
2.00
0.710
0.80
0.60
N/A
12.25
N/A
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
230
VAC
1.20
1.50
0.710
0.80
0.60
N/A
9.19
N/A
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.4
F
230
VAC
5.00
5.68
0.912
0.88
0.47
N/A
27.09
N/A
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
1
F
230
VAC
0.95
0.95
0.900
1.00
0.00
N/A
4.59
N/A
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.6
CWS Workstation
1
F
230
VAC
0.657
0.657
0.900
1.00
0.00
N/A
3.17
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
Flow Comp System
1
F
230
VAC
0.51
0.51
0.900
1.00
0.00
N/A
2.46
N/A
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.2
224 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
To Description
3 Ph / 1 Ph
F/M
Volt
kW
kVA
p.u
p.u
ISC x √t k
0N for Feeder and C60H for Motor)
of load 225 of 522
p.u
p.u
Amp
Amp
No.of Run
Impedace Type
Current Carrying Capaci CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY Load Data Voltage No. Equip System, Phase Type Vin
Power
Cos φ
Sin φ
Selected Cable
Cos β (Start)
IFL
Ist
To Description
3 Ph / 1 Ph
F/M
Volt
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
No.of Run
Impedace Type R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
eater cable can be seen in the Doc. No. JTB-SF-E-LST-900-00013~00018, Electrical Cable Schedule.
mber of lighting fixtures will sum in the Electrical MTO.
ate
wer
Sin φ
=Sqrt (1-Cos² φ))
Lmax (Maximum Cable Length (m)) Ist (Motor Starting Current (Amp))
n (Quantity of cables in parallel per phase)
AG (Above Ground Installation)
(Efficiency)
UG (Under Ground Installation)
Isc (Short circuit current )
226 of 522
Current Carrying Capaci CCC
Corretion Factor
Derate
Amp
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
A
11 kV POWER CABLES
1
P-420-GS-9002A-01/02
420-GS-9002A
Steam Turbine Generator-A
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
3
F
11,000
VAC
6,500
2
P-420-GS-9002B-01/02
420-GS-9002B
Steam Turbine Generator-B
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
3
F
11,000
VAC
6,500
3
P-420-V-9002
420-V-9002
Essential Power Generator
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
3
F
11,000
VAC
3,000
4
P-420-TRF-0001A-01/02/03
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
420-TRF-0001A
11 / 6.6 kV Transformer A Substation-1 (Power Generation)
3
F
11,000
VAC
11,520
420-TRF-0001B
11 / 6.6 kV Transformer B Substation-1 (Power Generation)
3
F
11,000
VAC
11,520
5
P-420-TRF-0001B-01/02/03
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
6
P-800-SWG-0001
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
800-SWG-0001
11 kV Switchgear Infrastructure
3
F
11,000
VAC
2,223
7
P-800-TRF-0001
800-SWG-0001
11 kV Switchgear Infrastructure
800-TRF-0001
11 / 0.42 kV Transformer Infrastructure
3
F
11,000
VAC
2,400
227 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
211-SWG-0001
11 kV Switchgear Central Well Pad Substation
3
F
11,000
VAC
389
Volt
kW
8
P-211-SWG-0001
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
9
P-211-TRF-0001
211-SWG-0001
11 kV Switchgear Central Well Pad Substation
211-TRF-0001
11 / 0.42 kV Central Wellpad Transformer
3
F
11,000
VAC
384
10
P-211-SWG-0002
211-SWG-0001
11 kV Switchgear Central Well Pad Substation
212-SWG-0001
11 kV Switchgear East Well Pad Substation
3
F
11,000
VAC
384
11
P-212-SWG-0001
420-SWG/MCC-0001
11 kV Switchgear Substation-1 (Power Generation)
212-SWG-0001
11 kV Switchgear East Well Pad Substation
3
F
11,000
VAC
389
12
P-212-TRF-0001
212-SWG-0001
11 kV Switchgear East Well Pad Substation
212-TRF-0001
11 / 0.42 kV East Wellpad Transformer
3
F
11,000
VAC
384
13
P-710-SWG-0001
SWG823081 (PB-01S)
11 kV Switchgear Banyu Urip Main Gate House Area
710-SWG-0001
11 kV Switchgear Sales Gas Metering Substation
3
F
11,000
VAC
166
14
P-710-TRF-0001
710-SWG-0001
11 kV Switchgear Sales Gas Metering Substation
710-TRF-0001
11 / 0.42 kV Transformer Sales Gas Metering
3
F
11,000
VAC
120
B
6.6 kV POWER CABLES Substation-1 (Area 420 - Power Generation Substation) 228 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
1
P-420-TRF-0002A
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
420-TRF-0002A
6.6/0.4 kV Main Transformer
3
F
6,600
VAC
1,200
2
P-420-TRF-0002B
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
420-TRF-0002B
6.6/0.4 kV Main Transformer
3
F
6,600
VAC
1,200
3
P-420-TRF-0003A
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
420-TRF-0003A
6.6/0.4 kV Essential Transformer
3
F
6,600
VAC
1,536
4
P-420-TRF-0003B
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
420-TRF-0003B
6.6/0.4 kV Essential Transformer
3
F
6,600
VAC
1,536
Substation-2 (Area 231 - Train-A Substation) 5
P-231-SWG/MCC-0001A01/02
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
231-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-2 (Train-A)
3
F
6,600
VAC
4,840
6
P-231-SWG/MCC-0001B01/02
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
231-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-2 (Train-A)
3
F
6,600
VAC
4,840
7
P-231-TRF-0001A
231-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 2A Substation-2 (Train-A)
231-TRF-0001A
6.6/0.4 kV Transformer 1A Substation-2 (Train-A)
3
F
6,600
VAC
960
8
P-231-TRF-0001B
231-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 2B Substation-2 (Train-A)
231-TRF-0001B
6.6/0.4 kV Transformer 1B Substation-2 (Train-A)
3
F
6,600
VAC
960
229 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
9
P-231-TRF-0002A-01/02
231-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 2A Substation-2 (Train-A)
231-TRF-0002A
6.6/0.4 kV Transformer 2A Substation-2 (Train-A)
3
F
6,600
VAC
3,840
10
P-231-TRF-0002B-01/02
231-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 2B Substation-2 (Train-A)
231-TRF-0002B
6.6/0.4 kV Transformer 2B Substation-2 (Train-A)
3
F
6,600
VAC
3,840
Substation-3 (Area 280 - Train-B Substation) 11
P-280-SWG/MCC-0001A01/02
420-SWG/MCC-0002 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
280-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-3 (Train-B)
3
F
6,600
VAC
3,842
12
P-280-SWG/MCC-0001B01/02
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
280-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-3 (Train-B)
3
F
6,600
VAC
3,842
13
P-280-TRF-0001A-01/02
280-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 2A Substation-3
280-TRF-0001A
6.6/0.4 kV Transformer A Substation3 (Train-B)
3
F
6,600
VAC
3,456
14
P-280-TRF-0001B-01/02
280-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 2B Substation-3
280-TRF-0001B
6.6/0.4 kV Transformer B Substation3 (Train-B)
3
F
6,600
VAC
3,456
6.6 kV Switchgear / MCC MV 1A Substation-1 (Power Generation)
480-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 2A Substation-4 (Utility)
3
F
6,600
VAC
1,798
Substation-4 (Area 480 - Utility Substation) 15
P-480-SWG/MCC-0001 A
420-SWG/MCC-0002 (BUS A)
230 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
16
P-480-SWG/MCC-0001 B
420-SWG/MCC-0002 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-1 (Power Generation)
480-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 2B Substation-4 (Utility)
3
F
6,600
VAC
1,798
17
P-480-TRF-0001A
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
480-TRF-0001A
6.6/0.4 kV Transformer Substation-4 (Utility)
3
F
6,600
VAC
768
18
P-480-TRF-0001B
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
480-TRF-0001B
6.6/0.4 kV Transformer Substation-4 (Utility)
3
F
6,600
VAC
768
DELETEP-224-C-9001-3 A
231-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-2 (Train-A)
224-C-9001-3 A
VRU Compressor (3rd Stage) MotorA
3
M
6,600
VAC
300.00
DELETEP-224-C-9001-3 B
231-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-2 (Train-A)
224-C-9001-3 B
VRU Compressor (3rd Stage) MotorB
3
M
6,600
VAC
300.00
DELETEP-224-C-9001-4 A
231-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-2 (Train-A)
224-C-9001-4 A
VRU Compressor (4th Stage) MotorA
3
M
6,600
VAC
750.00
DELETEP-224-C-9001-4 B
231-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-2 (Train-A)
224-C-9001-4 B
VRU Compressor (4th Stage) MotorB
3
M
6,600
VAC
750.00
Vapor Recovery Unit (VRU)
Acid Gas Enrichment (AGE) Unit - Train A
231 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
19
P-280A-P-5001 A
231-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-2 (Train-A)
280A-P-5001A
Lean Amine Pump-A (Train A)
3
M
6,600
VAC
200.00
20
P-280A-P-5001 B
231-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-2 (Train-A)
280A-P-5001B
Lean Amine Pump-B (Train A)
3
M
6,600
VAC
200.00
Acid Gas Enrichment (AGE) Unit - Train B 21
P-280B-P-3001 A
280-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-3 (Train-B)
280B-P-3001A
Lean Amine Pump-A (Train B)
3
M
6,600
VAC
200.00
22
P-280B-P-3001 B
280-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-3 (Train-B)
280B-P-3001B
Lean Amine Pump-B (Train B)
3
M
6,600
VAC
200.00
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
410-P-9011
HP BWF Start-Up Pump
3
M
6,600
VAC
300.00
6.6 kV Switchgear/MCC Substation-4 (Utility)
440-V-9001 A
Instrument Air Compressor Package Motor A
3
M
6,600
VAC
355.00
Boiler Feed Water (BFW) 23
P-410-P-9011
Instrument Air / Nitrogen Package 24
P-440-V-9001 A
480-SWG/MCC-0001
232 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
25
P-440-V-9001 B
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
440-V-9001 B
Instrument Air Compressor Package Motor B
3
M
6,600
VAC
355.00
26
P-440-V-9001 C
480-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
440-V-9001 C
Instrument Air Compressor Package Motor C
3
M
6,600
VAC
355.00
410-SWG/MCC-0001
6.6 kV Switchgear/MCC Substation-4 (Utility)
490-P-9007
Firewater Pump - Electric
3
M
6,600
VAC
300.00
Fire Water System DELETED P-490-P-9007
C
0.4 kV POWER CABLES Inlet Separation Unit
1
P-221-E-9001-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-1
Inlet Cooler Fan 1
3
M
400
VAC
15.00
2
P-221-E-9001-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-2
Inlet Cooler Fan 2
3
M
400
VAC
15.00
233 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
3
P-221-E-9001-3
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-3
Inlet Cooler Fan 3
3
M
400
VAC
15.00
4
P-221-E-9001-4
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-4
Inlet Cooler Fan 4
3
M
400
VAC
15.00
5
P-221-E-9001-5
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-5
Inlet Cooler Fan 5
3
M
400
VAC
15.00
6
P-221-E-9001-6
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-6
Inlet Cooler Fan 6
3
M
400
VAC
15.00
7
P-221-E-9001-7
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-7
Inlet Cooler Fan 7
3
M
400
VAC
15.00
8
P-221-E-9001-8
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
221-E-9001-8
Inlet Cooler Fan 8
3
M
400
VAC
15.00
Produced Water Storage 9
P-222-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9001 A
Produced Water Transfer Pump A
3
M
400
VAC
5.50
10
P-222-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9001 B
Produced Water Transfer Pump B
3
M
400
VAC
5.50
234 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
11
P-222-P-9002 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9002 A
Pipeline Produced Water Transfer Pump A
3
M
400
VAC
75.00
12
P-222-P-9002 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9002 B
Pipeline Produced Water Transfer Pump B
3
M
400
VAC
75.00
13
P-222-P-9003
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
222-P-9003
Skim Oil Pump
3
M
400
VAC
0.37
Condensate Storage 14
P-223-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
223-P-9001 A
Pipeline Condensate Transfer Pump A
3
M
400
VAC
37.00
15
P-223-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
223-P-9001 B
Pipeline Condensate Transfer Pump B
3
M
400
VAC
37.00
DELETEP-224-C-9001-1 A-01/02
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-C-9001-1 A
VRU Compressor (1st Stage) MotorA
3
M
0
VAC
132.00
DELETEP-224-C-9001-1 B-01/02
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-C-9001-1 B
VRU Compressor (1st Stage) MotorB
3
M
0
VAC
132.00
Vapor Recovery Unit (VRU)
235 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
16
P-224-E-9001-1 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9001-1 A
VRU Intercooler-A (1st Stage) Fan-1
3
M
400
VAC
4.00
17
P-224-E-9001-2 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9001-2 A
VRU Intercooler-A (1st Stage) Fan-2
3
M
400
VAC
4.00
18
P-224-E-9001-1 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9001-1 B
VRU Intercooler-B (1st Stage) Fan-1
3
M
400
VAC
4.00
19
P-224-E-9001-2 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9001-2 B
VRU Intercooler-B (1st Stage) Fan-2
3
M
400
VAC
4.00
DELETEP-224-C-9001-2 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-C-9001-2 A
VRU Compressor (2nd Stage) MotorA
3
M
0
VAC
75.00
DELETEP-224-C-9001-2 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-C-9001-2 B
VRU Compressor (2nd Stage) MotorB
3
M
0
VAC
75.00
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9002 A
VRU Intercooler-A (2nd Stage) Fan-1
3
M
400
VAC
1.50
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9002-2 A
VRU Intercooler-A (2nd Stage) Fan-2
3
M
0
VAC
1.10
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9002 B
VRU Intercooler-B (2nd Stage) Fan-1
3
M
400
VAC
1.50
20
P-224-E-9002 A
DELETEP-224-E-9002-2 A
21
P-224-E-9002 B
236 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
DELETEP-224-E-9002-2 B
22
P-224-E-9003 A
DELETEP-224-E-9003-2 A
23
P-224-E-9003 B
DELETEP-224-E-9003-2 B
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9002-2 B
VRU Intercooler-B (2nd Stage) Fan-2
3
M
0
VAC
1.10
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9003 A
VRU Intercooler-A (3rd Stage) Fan-1
3
M
400
VAC
2.20
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9003-2 A
VRU Intercooler-A (3rd Stage) Fan-2
3
M
0
VAC
2.20
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9003 B
VRU Intercooler-B (3rd Stage) Fan-1
3
M
400
VAC
2.20
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-E-9003-2 B
VRU Intercooler-B (3rd Stage) Fan-2
3
M
0
VAC
2.20
Volt
kW
24
P-224-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-P-9001 A
VRU Knockout Pump A
3
M
400
VAC
0.37
25
P-224-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-P-9001 B
VRU Knockout Pump B
3
M
400
VAC
0.37
26
P-224-C-9001-01/02
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
224-C-9001
Driver Motor for VRU Compressor
3
M
400
VAC
160.00
Dew Point Control 237 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
27
P-231-P-9001
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
231-P-9001
Methanol Injection Pump
3
M
400
VAC
3.00
Volt
kW
Condensate Stabilization 28
P-232-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-P-9001 A
Condensate Reflux Pump A
3
M
400
VAC
7.50
29
P-232-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-P-9001 B
Condensate Reflux Pump B
3
M
400
VAC
7.50
30
P-232-E-9001-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-E-9001-1
Condensate Cooler Fan-1
3
M
400
VAC
4.00
31
P-232-E-9001-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-E-9001-2
Condensate Cooler Fan-2
3
M
400
VAC
4.00
32
P-232-P-9002
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-P-9002
Condensate Stabilizer Recycle Liquid Pump
3
M
400
VAC
7.50
33
P-232-E-9003-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-E-9003-1
Recycle Gas Compressor Cooler Fan-1
3
M
400
VAC
3.00
34
P-232-E-9003-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
232-E-9003-2
Recycle Gas Compressor Cooler Fan-2
3
M
400
VAC
3.00
238 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
Ethylene Glycol (EG) Regeneration 35
P-233-P-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9001 A
EG Circulator Pump A
3
M
400
VAC
18.50
36
P-233-P-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9001 B
EG Circulator Pump B
3
M
400
VAC
18.50
37
P-233-P-9002 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9002 A
EG Reflux Pump A
3
M
400
VAC
0.37
38
P-233-P-9002 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9002 B
EG Reflux Pump B
3
M
400
VAC
0.37
39
P-233-P-9003 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9003 A
Produced Water Booster Pump A
3
M
400
VAC
0.75
40
P-233-P-9003 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9003 B
Produced Water Booster Pump B
3
M
400
VAC
0.75
41
P-233-P-9004
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9004
EG Makeup Pump
3
M
400
VAC
18.50
42
P-233-C-9001 A
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-C-9001 A
EG Regeneration Overhead Gas Compressor A
3
M
400
VAC
75.00
239 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
43
P-233-C-9001 B
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-C-9001 B
EG Regeneration Overhead Gas Compressor B
3
M
400
VAC
75.00
44
P-233-E-9005-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-E-9005-1
EG Regeneration Tower Cooler Fan-1
3
M
400
VAC
2.20
45
P-233-E-9005-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-E-9005-2
EG Regeneration Tower Cooler Fan-2
3
M
400
VAC
2.20
46
P-233-P-9005
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
233-P-9005
Glycol Drain Return Pump
3
M
400
VAC
0.75
Propylene - Refrigeration Unit 47
P-234-E-9001-1
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-1
Propylene Condenser Fan 1
3
M
400
VAC
7.50
48
P-234-E-9001-2
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-2
Propylene Condenser Fan 2
3
M
400
VAC
7.50
49
P-234-E-9001-3
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-3
Propylene Condenser Fan 3
3
M
400
VAC
7.50
50
P-234-E-9001-4
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-4
Propylene Condenser Fan 4
3
M
400
VAC
7.50
240 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
51
P-234-E-9001-5
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-5
Propylene Condenser Fan 5
3
M
400
VAC
7.50
52
P-234-E-9001-6
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-6
Propylene Condenser Fan 6
3
M
400
VAC
7.50
53
P-234-E-9001-7
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-6
Propylene Condenser Fan 7
3
M
400
VAC
7.50
54
P-234-E-9001-8
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
234-E-9001-6
Propylene Condenser Fan 8
3
M
400
VAC
7.50
55
P-234-CA-9001-1 A
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
234-CA-9001-1 A
Propylene Compressor A (1st Stage) Auxiliary Load
3
M
400
VAC
45.00
56
P-234-CA-9001-2 A
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
234-CA-9001-2 A
Propylene Compressor A (2nd Stage) Auxiliary Load
3
M
400
VAC
45.00
57
P-234-CA-9001-1 B
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
234-CA-9001-1 B
Propylene Compressor B (1st Stage) Auxiliary Load
3
M
400
VAC
45.00
58
P-234-CA-9001-2 B
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
234-CA-9001-2 B
Propylene Compressor B (2nd Stage) Auxiliary Load
3
M
400
VAC
45.00
AGRU-A 241 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
59
P-240A-E-1001-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-1
Lean Solvent Air Cooler-A (AGRU A) #1
3
M
400
VAC
55.00
60
P-240A-E-1001-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-2
Lean Solvent Air Cooler-A (AGRU A) #2
3
M
400
VAC
55.00
61
P-240A-E-1001-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-3
Lean Solvent Air Cooler-A (AGRU A) #3
3
M
400
VAC
55.00
62
P-240A-E-1001-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-4
Lean Solvent Air Cooler-A (AGRU A) #4
3
M
400
VAC
55.00
63
P-240A-E-1001-5
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-5
Lean Solvent Air Cooler-A (AGRU A) #5
3
M
400
VAC
55.00
64
P-240A-E-1001-6
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-6
Lean Solvent Air Cooler-A (AGRU A) #6
3
M
400
VAC
55.00
65
P-240A-E-1001-7
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-7
Lean Solvent Air Cooler-A (AGRU A) #7
3
M
400
VAC
55.00
66
P-240A-E-1001-8
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1001-8
Lean Solvent Air Cooler-A (AGRU A) #8
3
M
400
VAC
55.00
67
P-240A-E-2001-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-1
Lean Solvent Air Cooler-B (AGRU A) #1
3
M
400
VAC
55.00
242 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
68
P-240A-E-2001-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-2
Lean Solvent Air Cooler-B (AGRU A) #2
3
M
400
VAC
55.00
69
P-240A-E-2001-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-3
Lean Solvent Air Cooler-B (AGRU A) #3
3
M
400
VAC
55.00
70
P-240A-E-2001-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-4
Lean Solvent Air Cooler-B (AGRU A) #4
3
M
400
VAC
55.00
71
P-240A-E-2001-5
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-5
Lean Solvent Air Cooler-B (AGRU A) #5
3
M
400
VAC
55.00
72
P-240A-E-2001-6
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-6
Lean Solvent Air Cooler-B (AGRU A) #6
3
M
400
VAC
55.00
73
P-240A-E-2001-7
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-7
Lean Solvent Air Cooler-B (AGRU A) #7
3
M
400
VAC
55.00
74
P-240A-E-2001-8
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2001-8
Lean Solvent Air Cooler-B (AGRU A) #8
3
M
400
VAC
55.00
75
P-240A-PA-1002
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-1002
Auxiliary for HP Lean Solvent Pump 1 (Train A)
3
M
400
VAC
22.00
76
P-240A-PA-2002
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-2002
Auxiliary for HP Lean Solvent Pump 2 (Train A)
3
M
400
VAC
22.00
243 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
77
P-240A-PA-5003
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-5003
Auxiliary for HP Lean Solvent Pump 3 (Train A)
3
M
400
VAC
22.00
78
P-240A-P-1003 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-1003A
Reflux Pump-1 A (Train A)
3
M
400
VAC
11.00
79
P-240A-P-1003 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-1003B
Reflux Pump-1 B (Train A)
3
M
400
VAC
11.00
80
P-240A-P-2003 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-2003A
Reflux Pump-2 A (Train A)
3
M
400
VAC
11.00
81
P-240A-P-2003 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-2003B
Reflux Pump-2 B (Train A)
3
M
400
VAC
11.00
82
P-240A-P-5001
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-5001
Drained Solvent Pump (Stand-By) Train A
3
M
400
VAC
4.00
83
P-240A-P-5002
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-5002
Drained Hydrocarbon Pump (StandBy) Train A
3
M
400
VAC
2.20
84
P-240A-PA-1012
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-1012
Auxiliary for LP Lean Solvent Pump 1 (Train A)
3
M
400
VAC
4.00
85
P-240A-PA-2012
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-2012
Auxiliary for LP Lean Solvent Pump 2 (Train A)
3
M
400
VAC
4.00
244 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
86
P-240A-PA-5012
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-5012
Auxiliary for LP Lean Solvent Pump 3 (Train A)
3
M
400
VAC
4.00
87
P-240A-PA-1001
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-1001
Auxiliary for Regenerator Lean Solvent Pump 1 (Train A)
3
M
400
VAC
5.50
88
P-240A-PA-2001
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-2001
Auxiliary for Regenerator Lean Solvent Pump 2 (Train A)
3
M
400
VAC
5.50
89
P-240A-PA-5004
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
240A-PA-5004
Auxiliary for Regenerator Lean Solvent Pump 3 (Train A)
3
M
400
VAC
5.50
90
P-240A-P-1006 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-1006 A
Reboiler Condensate Pump-1A (Train A)
3
M
400
VAC
15.00
91
P-240A-P-1006 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-1006 B
Reboiler Condensate Pump-1B (Train A)
3
M
400
VAC
15.00
92
P-240A-P-2006 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-2006 A
Reboiler Condensate Pump-2A (Train A)
3
M
400
VAC
15.00
93
P-240A-P-2006 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-P-2006 B
Reboiler Condensate Pump-2B (Train A)
3
M
400
VAC
15.00
94
P-240A-E-1004-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1004-1
Overhead Condenser-A (AGRU A) #1
3
M
400
VAC
55.00
245 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
95
P-240A-E-1004-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1004-2
Overhead Condenser-A (AGRU A) #2
3
M
400
VAC
55.00
96
P-240A-E-1004-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1004-3
Overhead Condenser-A (AGRU A) #3
3
M
400
VAC
55.00
97
P-240A-E-1004-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-1004-4
Overhead Condenser-A (AGRU A) #4
3
M
400
VAC
55.00
98
P-240A-E-2004-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2004-1
Overhead Condenser-B (AGRU A) #1
3
M
400
VAC
55.00
99
P-240A-E-2004-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2004-2
Overhead Condenser-B (AGRU A) #2
3
M
400
VAC
55.00
100 P-240A-E-2004-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2004-3
Overhead Condenser-B (AGRU A) #3
3
M
400
VAC
55.00
101 P-240A-E-2004-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240A-E-2004-4
Overhead Condenser-B (AGRU A) #4
3
M
400
VAC
55.00
102 P-240-P-9001 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240-P-9001A
AGRU Fresh Solvent Pump A
3
M
400
VAC
5.50
103 P-240-P-9001 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
240-P-9001B
AGRU Fresh Solvent Pump B
3
M
400
VAC
5.50
246 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
104 P-240B-E-3001-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-1
Lean Solvent Air Cooler-A (AGRU B) #1
3
M
400
VAC
55.00
105 P-240B-E-3001-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-2
Lean Solvent Air Cooler-A (AGRU B) #2
3
M
400
VAC
55.00
106 P-240B-E-3001-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-3
Lean Solvent Air Cooler-A (AGRU B) #3
3
M
400
VAC
55.00
107 P-240B-E-3001-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-4
Lean Solvent Air Cooler-A (AGRU B) #4
3
M
400
VAC
55.00
108 P-240B-E-3001-5
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-5
Lean Solvent Air Cooler-A (AGRU B) #5
3
M
400
VAC
55.00
109 P-240B-E-3001-6
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-6
Lean Solvent Air Cooler-A (AGRU B) #6
3
M
400
VAC
55.00
110 P-240B-E-3001-7
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-7
Lean Solvent Air Cooler-A (AGRU B) #7
3
M
400
VAC
55.00
111 P-240B-E-3001-8
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3001-8
Lean Solvent Air Cooler-A (AGRU B) #8
3
M
400
VAC
55.00
Volt
kW
AGRU-B
247 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
112 P-240B-E-4001-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-1
Lean Solvent Air Cooler-B (AGRU B) #1
3
M
400
VAC
55.00
113 P-240B-E-4001-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-2
Lean Solvent Air Cooler-B (AGRU B) #2
3
M
400
VAC
55.00
114 P-240B-E-4001-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-3
Lean Solvent Air Cooler-B (AGRU B) #3
3
M
400
VAC
55.00
115 P-240B-E-4001-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-4
Lean Solvent Air Cooler-B (AGRU B) #4
3
M
400
VAC
55.00
116 P-240B-E-4001-5
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-5
Lean Solvent Air Cooler-B (AGRU B) #5
3
M
400
VAC
55.00
117 P-240B-E-4001-6
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-6
Lean Solvent Air Cooler-B (AGRU B) #6
3
M
400
VAC
55.00
118 P-240B-E-4001-7
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-7
Lean Solvent Air Cooler-B (AGRU B) #7
3
M
400
VAC
55.00
119 P-240B-E-4001-8
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4001-8
Lean Solvent Air Cooler-B (AGRU B) #8
3
M
400
VAC
55.00
120 P-240B-PA-3002
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-3002
Auxiliary for HP Lean Solvent Pump 1 (Train B)
3
M
400
VAC
22.00
248 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
121 P-240B-PA-4002
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-4002
Auxiliary for HP Lean Solvent Pump 2 (Train B)
3
M
400
VAC
22.00
122 P-240B-PA-6003
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-6003
Auxiliary for HP Lean Solvent Pump 3 (Train B)
3
M
400
VAC
22.00
123 P-240B-P-3003 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-3003A
Reflux Pump-1 A (Train B)
3
M
400
VAC
11.00
124 P-240B-P-3003 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-3003 B
Reflux Pump-1 B (Train B)
3
M
400
VAC
11.00
125 P-240B-P-4003 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-4003A
Reflux Pump-2 A (Train B)
3
M
400
VAC
11.00
126 P-240B-P-4003 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-4003 B
Reflux Pump-2 B (Train B)
3
M
400
VAC
11.00
127 P-240B-P-6001
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-6001
Drained Solvent Pump (Stand-By) Train B
3
M
400
VAC
4.00
128 P-240B-P-6002
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-6002
Drained Hydrocarbon Pump (StandBy) Train B
3
M
400
VAC
2.20
127 P-240B-PA-3012
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-3012
Auxiliary for LP Lean Solvent Pump 1 (Train B)
3
M
400
VAC
4.00
249 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
128 P-240B-PA-4012
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-4012
Auxiliary for LP Lean Solvent Pump 2 (Train B)
3
M
400
VAC
4.00
129 P-240B-PA-6012
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-6012
Auxiliary for LP Lean Solvent Pump 3 (Train B)
3
M
400
VAC
4.00
130 P-240B-PA-3001
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-3001
Auxiliary for Regenerator Lean Solvent Pump 1 (Train B)
3
M
400
VAC
5.50
131 P-240B-PA-4001
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-4001
Auxiliary for Regenerator Lean Solvent Pump 2 (Train B)
3
M
400
VAC
5.50
132 P-240B-PA-6004
280-SWG/MCC-0002
Essential LV SWGR/MCC Substation-3 (Train-B)
240B-PA-6004
Auxiliary for Regenerator Lean Solvent Pump 3 (Train B)
3
M
400
VAC
5.50
133 P-240B-P-3006 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-3006 A
Reboiler Condensate Pump-1 A (Train B)
3
M
400
VAC
15.00
134 P-240B-P-3006 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-3006 B
Reboiler Condensate Pump-1 B (Train B)
3
M
400
VAC
15.00
135 P-240B-P-4006 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-4006 A
Reboiler Condensate Pump-2 A (Train B)
3
M
400
VAC
15.00
136 P-240B-P-4006 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-P-4006 B
Reboiler Condensate Pump-2 B (Train B)
3
M
400
VAC
15.00
250 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
137 P-240B-E-3004-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3004-1
Overhead Condenser-A (AGRU B) #1
3
M
400
VAC
55.00
138 P-240B-E-3004-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3004-2
Overhead Condenser-A (AGRU B) #2
3
M
400
VAC
55.00
139 P-240B-E-3004-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3004-3
Overhead Condenser-A (AGRU B) #3
3
M
400
VAC
55.00
140 P-240B-E-3004-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-3004-4
Overhead Condenser-A (AGRU B) #4
3
M
400
VAC
55.00
141 P-240B-E-4004-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4004-1
Overhead Condenser-B (AGRU B) #1
3
M
400
VAC
55.00
142 P-240B-E-4004-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4004-2
Overhead Condenser-B (AGRU B) #2
3
M
400
VAC
55.00
143 P-240B-E-4004-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4004-3
Overhead Condenser-B (AGRU B) #3
3
M
400
VAC
55.00
144 P-240B-E-4004-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
240B-E-4004-4
Overhead Condenser-B (AGRU B) #4
3
M
400
VAC
55.00
Sales Gas Dehydration Unit 251 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
145 P-250-P-9001 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-P-9001 A
Sales Gas Dehy TEG Circulation Pump A
3
M
400
VAC
132.00
146 P-250-P-9001 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-P-9001 B
Sales Gas Dehy TEG Circulation Pump B
3
M
400
VAC
132.00
147 P-250-E-9001-1
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-E-9001-1
Sales Gas Dehy TEG Lean Cooler Fan-1
3
M
400
VAC
7.50
148 P-250-E-9001-2
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-E-9001-2
Sales Gas Dehy TEG Lean Cooler Fan-2
3
M
400
VAC
7.50
DELETEP-250-E-9001-3
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-E-9001-3
Sales Gas Dehy TEG Lean Cooler Fan-3
3
M
0
VAC
15.00
DELETEP-250-E-9001-4
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-E-9001-4
Sales Gas Dehy TEG Lean Cooler Fan-4
3
M
0
VAC
15.00
149 P-250-P-9002
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-P-9002
Sales Gas Dehy TEG Supply Pump
3
M
400
VAC
7.50
150 P-250-P-9003
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
250-P-9003
TEG Drain Vessel Pump
3
M
400
VAC
0.75
Sales Gas Compression 252 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
151 P-260-E-9001-1
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
260-E-9001-1
Sales Gas Compressor Discharge Cooler Fan 1
3
M
400
VAC
7.50
152 P-260-E-9001-2
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
260-E-9001-2
Sales Gas Compressor Discharge Cooler Fan 2
3
M
400
VAC
7.50
DELETEP-260-E-9001-3
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
260-E-9001-3
Sales Gas Compressor Discharge Cooler Fan 3
3
M
0
VAC
30.00
DELETEP-260-E-9001-4
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
260-E-9001-4
Sales Gas Compressor Discharge Cooler Fan 4
3
M
0
VAC
30.00
153 P-260-CA-9001 A
420-SWG/MCC-0004
Essential LV Switchgear/MCC Substation-1 (Power Generation)
260-CA-9001 A
Sales Gas Compressor A Auxiliary Load
3
M
400
VAC
75.00
154 P-260-CA-9001 B
420-SWG/MCC-0004
Essential LV Switchgear/MCC Substation-1 (Power Generation)
260-CA-9001 B
Sales Gas Compressor B Auxiliary Load
3
M
400
VAC
75.00
Volt
kW
Acid Gas Enrichment (AGE) Unit - Train A 155 P-280A-P-1005
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1005
Wash Water Pump-1 at AGE Absorber (Train A)
3
M
400
VAC
7.50
156 P-280A-P-2005
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2005
Wash Water Pump-2 at AGE Absorber (Train A)
3
M
400
VAC
7.50
253 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
157 P-280A-P-5005
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5005
Wash Water Pump-3 at AGE Absorber (Train A)
3
M
400
VAC
7.50
158 P-280A-P-1004
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1004
Regenerator Reflux Pump-1 (Train A)
3
M
400
VAC
15.00
159 P-280A-P-2004
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2004
Regenerator Reflux Pump-2 (Train A)
3
M
400
VAC
15.00
160 P-280A-P-5004
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5004
Regenerator Reflux Pump-3 (Train A)
3
M
400
VAC
15.00
161 P-280A-P-5002 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5002A
Solvent Sump Pump-A (Train A)
3
M
400
VAC
11.00
162 P-280A-P-5002 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5002B
Solvent Sump Pump-B (Train A)
3
M
400
VAC
11.00
163 P-280A-E-1002
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-1002
Regenerator Overhead Condenser 1 (Train A)
3
M
400
VAC
37.00
164 P-280A-E-2002
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-2002
Regenerator Overhead Condenser 2 (Train A)
3
M
400
VAC
37.00
165 P-280A-P-1008
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1008
Regenerator Bottoms Pump 1 (Train A)
3
M
400
VAC
75.00
254 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
166 P-280A-P-2008
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2008
Regenerator Bottoms Pump 2 (Train A)
3
M
400
VAC
75.00
167 P-280A-P-5008
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5008
Regenerator Bottoms Pump 3 (Train A)
3
M
400
VAC
75.00
168 P-280A-E-5001-1
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-1
Lean Amine Cooler (Train A) #1
3
M
400
VAC
37.00
169 P-280A-E-5001-2
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-2
Lean Amine Cooler (Train A) #2
3
M
400
VAC
37.00
170 P-280A-E-5001-3
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-3
Lean Amine Cooler (Train A) #3
3
M
400
VAC
37.00
171 P-280A-E-5001-4
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-4
Lean Amine Cooler (Train A) #4
3
M
400
VAC
37.00
172 P-280A-E-5001-5
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-5
Lean Amine Cooler (Train A) #5
3
M
400
VAC
37.00
173 P-280A-E-5001-6
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-6
Lean Amine Cooler (Train A) #6
3
M
400
VAC
37.00
174 P-280A-E-5001-7
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-7
Lean Amine Cooler (Train A) #7
3
M
400
VAC
37.00
255 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
175 P-280A-E-5001-8
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-E-5001-8
Lean Amine Cooler (Train A) #8
3
M
400
VAC
37.00
176 P-280A-P-1003
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1003
Rich Amine Pump-1 at AGE Absorber (Train A)
3
M
400
VAC
110.00
177 P-280A-P-2003
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2003
Rich Amine Pump-2 at AGE Absorber (Train A)
3
M
400
VAC
110.00
178 P-280A-P-5003
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5003
Rich Amine Pump-3 at AGE Absorber (Train A)
3
M
400
VAC
110.00
179 P-280-P-9001 A
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280-P-9001A
Fresh Solvent Pump A (Train A)
3
M
400
VAC
5.50
180 P-280-P-9001 B
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280-P-9001B
Fresh Solvent Pump B (Train A)
3
M
400
VAC
5.50
181 P-280A-P-1006
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-1006
Sour Water Pump-1 (Train A)
3
M
400
VAC
5.50
182 P-280A-P-2006
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-2006
Sour Water Pump-2 (Train A)
3
M
400
VAC
5.50
183 P-280A-P-5006
231-SWG/MCC-0004
Main LV Switchgear/MCC Substation-2 (Train-A)
280A-P-5006
Sour Water Pump-3 (Train A)
3
M
400
VAC
5.50
256 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
Acid Gas Enrichment (AGE) Unit - Train B 184 P-280B-P-3005
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3005
Wash Water Pump-1 at AGE Absorber (Train B)
3
M
400
VAC
11.00
185 P-280B-P-4005
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4005
Wash Water Pump-2 at AGE Absorber (Train B)
3
M
400
VAC
11.00
186 P-280B-P-6005
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6005
Wash Water Pump-3 at AGE Absorber (Train B)
3
M
400
VAC
11.00
187 P-280B-P-3004
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3004
Regenerator Reflux Pump-1 (Train B)
3
M
400
VAC
15.00
188 P-280B-P-4004
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4004
Regenerator Reflux Pump-2 (Train B)
3
M
400
VAC
15.00
189 P-280B-P-6004
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6004
Regenerator Reflux Pump-3 (Train B)
3
M
400
VAC
15.00
190 P-280B-P-6002 A
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6002A
Solvent Sump Pump-A (Train B)
3
M
400
VAC
11.00
191 P-280B-P-6002 B
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6002B
Solvent Sump Pump-B (Train B)
3
M
400
VAC
11.00
257 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
192 P-280B-E-3002
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-3002
Regenerator Overhead Condenser 1 (Train B)
3
M
400
VAC
37.00
193 P-280B-E-4002
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-4002
Regenerator Overhead Condenser 2 (Train B)
3
M
400
VAC
37.00
194 P-280B-P-3008
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3008
Regenerator Bottoms Pump-1 (Train B)
3
M
400
VAC
75.00
195 P-280B-P-4008
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4008
Regenerator Bottoms Pump-2 (Train B)
3
M
400
VAC
75.00
196 P-280B-P-6008
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6008
Regenerator Bottoms Pump-3 (Train B)
3
M
400
VAC
75.00
197 P-280B-E-6001-1
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-1
Lean Amine Cooler (Train B) #1
3
M
400
VAC
37.00
198 P-280B-E-6001-2
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-2
Lean Amine Cooler (Train B) #2
3
M
400
VAC
37.00
199 P-280B-E-6001-3
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-3
Lean Amine Cooler (Train B) #3
3
M
400
VAC
37.00
200 P-280B-E-6001-4
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-4
Lean Amine Cooler (Train B) #4
3
M
400
VAC
37.00
258 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
201 P-280B-E-6001-5
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-5
Lean Amine Cooler (Train B) #5
3
M
400
VAC
37.00
202 P-280B-E-6001-6
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-6
Lean Amine Cooler (Train B) #6
3
M
400
VAC
37.00
203 P-280B-E-6001-7
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-7
Lean Amine Cooler (Train B) #7
3
M
400
VAC
37.00
204 P-280B-E-6001-8
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-E-6001-8
Lean Amine Cooler (Train B) #8
3
M
400
VAC
37.00
205 P-280B-P-3003-01/02
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3003
Rich Amine Pump-A at AGE Absorber (Train B)
3
M
400
VAC
110.00
206 P-280B-P-4003-01/02
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4003
Rich Amine Pump-B at AGE Absorber (Train B)
3
M
400
VAC
110.00
207 P-280B-P-6003-01/02
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6003
Rich Amine Pump-C at AGE Absorber (Train B)
3
M
400
VAC
110.00
208 P-280B-P-3006
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-3006
Sour Water Pump-A (Train B)
3
M
400
VAC
15.00
209 P-280B-P-4006
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-4006
Sour Water Pump-B (Train B)
3
M
400
VAC
15.00
259 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
280B-P-6006
Sour Water Pump-C (Train B)
3
M
400
VAC
15.00
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9002A
Sulfur Transfer Pump A
3
M
400
VAC
2.20
212 P-290-P-9002 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9002B
Sulfur Transfer Pump B
3
M
400
VAC
2.20
213 P-290-CA-9001 A
420-SWG/MCC-0004
Essential LV Switchgear/MCC Substation-1 (Power Generation)
290-CA-9001A
Claus Air Blower A Auxiliary Load
3
M
400
VAC
7.50
214 P-290-CA-9001 B
420-SWG/MCC-0004
Essential LV Switchgear/MCC Substation-1 (Power Generation)
290-CA-9001B
Claus Air Blower B Auxiliary Load
3
M
400
VAC
7.50
215 P-290-P-9001 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9001A
Sour Condensate Pump A
3
M
400
VAC
2.20
216 P-290-P-9001 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9001B
Sour Condensate Pump B
3
M
400
VAC
2.20
217 P-290-P-9003 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9003A
Sulfur Handling Pump A
3
M
400
VAC
11.00
210 P-280B-P-6006
Volt
kW
Sulfur Recovery Unit 211 P-290-P-9002 A
260 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
218 P-290-P-9003 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9003B
Sulfur Handling Pump B
3
M
400
VAC
11.00
219 P-290-P-9011 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9011A
LP Condensate Pump A
3
M
400
VAC
11.00
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
290-P-9011B
LP Condensate Pump B
3
M
400
VAC
11.00
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9001A
Quench Water Pump-A
3
M
400
VAC
75.00
222 P-310-P-9001 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9001B
Quench Water Pump-B
3
M
400
VAC
75.00
223 P-310-P-9002 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9002A
Wash Water Pump-A at TGU Absorber
3
M
400
VAC
11.00
224 P-310-P-9002 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9002B
Wash Water Pump-B at TGU Absorber
3
M
400
VAC
11.00
225 P-310-P-9003 A
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9003A
Rich Amine Pump-A at TGU Absorber
3
M
400
VAC
75.00
220 P-290-P-9011 B
Volt
kW
Tail Gas Unit (TGU) 221 P-310-P-9001 A
261 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
226 P-310-P-9003 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9003B
Rich Amine Pump-B at TGU Absorber
3
M
400
VAC
75.00
227 P-310-P-9004
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-P-9004
Sour Water Drain Return Pump
3
M
400
VAC
2.20
228 P-310-E-9002-1
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-E-9002-1
Quench Water Air Cooler #1
3
M
400
VAC
30.00
229 P-310-E-9002-2
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
310-E-9002-2
Quench Water Air Cooler #2
3
M
400
VAC
30.00
230 P-410-P-9001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9001A
BFW Transfer Pump-A
3
M
400
VAC
30.00
231 P-410-P-9001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9001B
BFW Transfer Pump-B
3
M
400
VAC
30.00
232 P-410-P-9003 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9003A
Steam Condensate Pump A
3
M
400
VAC
11.00
233 P-410-P-9003 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9003B
Steam Condensate Pump B
3
M
400
VAC
11.00
Volt
kW
Boiler Feed Water (BFW)
262 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
234 P-410-P-9004 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9004A
Blowdown Pump A
3
M
400
VAC
18.50
235 P-410-P-9004 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9004B
Blowdown Pump B
3
M
400
VAC
18.50
236 P-410-P-9005 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9005A
LP BFW Pump A
3
M
400
VAC
37.00
237 P-410-P-9005 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9005B
LP BFW Pump B
3
M
400
VAC
37.00
238 P-410-E-9001-1
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-E-9001-1
Steam Condenser Fan-1
3
M
400
VAC
11.00
239 P-410-E-9001-2
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-E-9001-2
Steam Condenser Fan-2
3
M
400
VAC
11.00
DELETEP-410-E-9001-3
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
410-E-9001-3
Steam Condenser Fan-3
3
M
400
VAC
11.00
DELETEP-410-E-9001-4
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
410-E-9001-4
Steam Condenser Fan-4
3
M
400
VAC
11.00
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
410-E-9001-5
Steam Condenser Fan-5
3
M
0
VAC
0.00
DELETEP-410-E-9001-5
263 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
DELETEP-410-E-9001-6
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
410-E-9001-6
Steam Condenser Fan-6
3
M
0
VAC
0.00
DELETEP-410-E-9001-7
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
410-E-9001-7
Steam Condenser Fan-7
3
M
0
VAC
0.00
DELETEP-410-E-9001-8
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
410-E-9001-8
Steam Condenser Fan-8
3
M
0
VAC
0.00
DELETEP-410-E-9001-9
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
410-E-9001-9
Steam Condenser Fan-9
3
M
0
VAC
0.00
DELETEP-410-E-9001-10
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
410-E-9001-10
Steam Condenser Fan-10
3
M
0
VAC
0.00
240 P-410-TK-9002
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-TK-9002
Oxygen Scavenger Tank Mixer Motor
3
M
400
VAC
0.75
241 P-410-TK-9003
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-TK-9003
Neutralization Amine Tank Mixer Motor
3
M
400
VAC
0.75
242 P-410-TK-9004
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-TK-9004
Phosphate Solution Tank Mixer Motor
3
M
400
VAC
0.75
243 P-410-P-9008 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9008A
Oxygen Scavenger Pump Motor-A
3
M
400
VAC
0.75
264 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
244 P-410-P-9008 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9008B
Oxygen Scavenger Pump Motor-B
3
M
400
VAC
0.75
245 P-410-P-9009 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9009A
Neutralization Amine Pump Motor-A
3
M
400
VAC
1.10
246 P-410-P-9009 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9009B
Neutralization Amine Pump Motor-B
3
M
400
VAC
1.10
247 P-410-P-9010 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9010A
Phosphate Solution Pump Motor A
3
M
400
VAC
0.75
248 P-410-P-9010 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-P-9010B
Phosphate Solution Pump Motor B
3
M
400
VAC
0.75
249 P-410-E-9002-1
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-E-9002-1
Deaerator Steam Condenser Motor 1
3
M
400
VAC
30.00
250 P-410-E-9001-2
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
410-E-9002-2
Deaerator Steam Condenser Motor 2
3
M
400
VAC
30.00
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
450-P-9004 A
Raw Water Feed Pump A
3
M
400
VAC
45.00
Volt
kW
Water Treating 251 P-450-P-9004 A
265 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
450-P-9004B
Raw Water Feed Pump B
3
M
400
VAC
45.00
253 P-460-P-9001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-P-9001A
AGE Off-Gas K.O. Drum Pump-A
3
M
400
VAC
5.50
254 P-460-P-9001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-P-9001B
AGE Off-Gas K.O. Drum Pump-B
3
M
400
VAC
5.50
255 P-460-P-9002 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-P-9002A
TGU Off-Gas K.O. Drum Pump-A
3
M
400
VAC
5.50
256 P-460-P-9002 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-P-9002B
TGU Off-Gas K.O. Drum Pump-B
3
M
400
VAC
5.50
257 P-460-EA-9001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001A
Thermal Oxidizer Air Blower A Auxiliary Load
3
M
400
VAC
11.00
258 P-460-EA-9001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001B
Thermal Oxidizer Air Blower B Auxiliary Load
3
M
400
VAC
11.00
259 P-460-EA-9001 C
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001C
Thermal Oxidizer Air Blower C Auxiliary Load
3
M
400
VAC
11.00
252 P-450-P-9004 B
Volt
kW
Thermal Oxidizer Unit
266 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
260 P-460-EA-9001 D
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001D
Thermal Oxidizer Air Blower D Auxiliary Load
3
M
400
VAC
11.00
261 P-460-EA-9001 E
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
460-EA-9001E
Thermal Oxidizer Air Blower E Auxiliary Load
3
M
400
VAC
11.00
262 P-470-P-9013 A-01/02
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
470-P-9013 A
HP Flare Knockout Drum Condensate Pump A
3
M
400
VAC
90.00
263 P-470-P-9013 B-01/02
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
470-P-9013 B
HP Flare Knockout Drum Condensate Pump B
3
M
400
VAC
90.00
264 P-475-P-9014 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
475-P-9014 A
LP Flare Knockout Drum Condensate Pump A
3
M
400
VAC
75.00
265 P-475-P-9014 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
475-P-9014 B
LP Flare Knockout Drum Condensate Pump B
3
M
400
VAC
75.00
Volt
kW
HP Flare System
LP Flare System
Diesel Fuel
267 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
480-P-9015
Diesel Pump
3
M
400
VAC
5.50
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
490-P-9008
Firewater Jockey Pump
3
M
400
VAC
18.50
268 P-510-P-9001
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
510-P-9001
Close Drain Pump
3
M
400
VAC
37.00
269 P-520-P-9001
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
520-P-9001
Open Drain Pump
3
M
400
VAC
5.50
420-V-9001
Emergency Generator
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
3
F
400
VAC
320
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-BCH-5001
Battery Charger Emergency Diesel Generator
3
F
400
VAC
2.20
266 P-480-P-9015
Volt
kW
Fire Water System 267 P-490-P-9008
Open and Close Drain System
GENERATOR DEG - Emergency Generator 270 P-420-V-9001-01/02/03
271 P-420-BCH-5001
268 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
211-V-9007
Backup Generator Well Pad Central
211-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad Central
3
F
400
VAC
240.00
211-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad Central
211-BCH-5001
Battery Charger Backup Diesel Generator Well Pad Central
3
F
400
VAC
2.20
211-TRF-0001
11 / 0.4 kV Central Well Pad Transformer
211-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad Central
3
F
400
VAC
160
212-V-9006
Backup Generator Well Pad East
212-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad East
3
F
400
VAC
240.00
276 P-212-BCH-5001
212-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad East
212-BCH-5001
Battery Charger Backup Diesel Generator Well Pad East
3
F
400
VAC
2.20
277 P-212-TRF-0002
212-TRF-0001
11 /0.42 kV East Well Pad Transformer
212-SWG/MCC-0002
400 VAC Switchgear/MCC Well Pad East
3
F
400
VAC
160
Equipment Tag No.
Volt
kW
Backup Generator - Well Pad Central 272 P-211-V-9007-01/02
273 P-211-BCH-5001
274 P-211-TRF-0002-01/02
Backup Generator - Well Pad East 275 P-212-V-9006-01/02/03
Backup Generator - Infrastructure
269 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-GD-0001
Backup Generator Infrastructure
800-SWG/MCC-0001
400 VAC Switchgear/MCC Infrastructure
3
F
400
VAC
414
800-SWG/MCC-0002
400 VAC Switchgear/MCC Infrastructure
800-BCH-5001
Battery Charger Backup Diesel Generator Infrastructure
3
F
400
VAC
2.20
800-TRF-0001
11 / 0.4 kV Infrastructure Transformer
800-SWG/MCC-0002
400 VAC Switchgear/MCC Infrastructure
3
F
400
VAC
1,500
710-V-9003
Backup Generator Sales Gas Metering Station
710-SWG/MCC-0002
400 VAC Switchgear/MCC Sales Gas Metering Station
3
F
400
VAC
100.00
280 P-710-BCH-5001
710-SWG/MCC-0002
400 VAC Switchgear/MCC Sales Gas Metering Station
710-BCH-5001
Battery Charger Backup Diesel Generator Sales Gas Metering
3
F
400
VAC
2.20
281 P-710-TRF-0002
710-TRF-0001
11 / 0.42 kV Transformer Sales Gas Metering
410-SWG/MCC-0002
400 VAC Switchgear/MCC Sales Gas Metering Station
3
F
400
VAC
100.00
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1003
STG-A Lube Oil Clarifier Driver
3
M
400
VAC
1.50
DEL P-800-GD-0001-01/02/03/04
278 P-800-BCH-5001
DEL P-800-TRF-0001-01/02
Volt
kW
Backup Generator - Sales Gas Metering Station 279 P-710-V-9003
STG A - Main Generator A 282 P-420-P-1003
270 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
283 P-420-P-1001 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1001A
STG-A Lube Oil Pump Driver-A
3
M
400
VAC
30.00
284 P-420-P-1001 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1001B
STG-A Lube Oil Pump Driver-B
3
M
400
VAC
30.00
285 P-420-P-1002 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1002A
STG-A Lube Oil Tank Mist SeparatorA
3
M
400
VAC
4.00
286 P-420-P-1002 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1002B
STG-A Lube Oil Tank Mist SeparatorB
3
M
400
VAC
4.00
287 P-420-P-1004
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1004
STG-A Jacking Oil Oump Driver
3
M
400
VAC
1.50
288 P-420-P-1005
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-1005
STG-A Bearing Gear Driver
3
M
400
VAC
4.00
289 P-420-P-2003
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2003
STG-B Lube Oil Clarifier Driver
3
M
400
VAC
1.50
290 P-420-P-2001 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2001A
STG-B Lube Oil Pump Driver-A
3
M
400
VAC
30.00
Volt
kW
STG B - Main Generator B
271 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
291 P-420-P-2001 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2001B
STG-B Lube Oil Pump Driver-B
3
M
400
VAC
30.00
292 P-420-P-2002 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2002A
STG-B Lube Oil Mist Separator-A
3
M
400
VAC
4.00
293 P-420-P-2002 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2002B
STG-B Lube Oil Mist Separator-B
3
M
400
VAC
4.00
294 P-420-P-2004
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2004
STG-B Jacking Oil Oump Driver
3
M
400
VAC
1.50
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-P-2005
STG-B Bearing Gear Driver
3
M
400
VAC
4.00
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-E-4001
Radiator Fan Essential Generator
3
M
400
VAC
11.00
297 P-420-DPN-4001
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DPN-4001
LCP Power Essential Generator
3
F
400
VAC
18.25
298 P-420-BCH-4001
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-BCH-4001
Battery Charger Essential Generator
3
F
400
VAC
2.00
295 P-420-P-2005
Volt
kW
GEG+DEG - Essential Generator 296 P-420-E-4001
272 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
Transformer Rectifier Unit (TRU) for Cathodic Protection 299 P-610-TRU-9001
420-SWG/MCC-0003
Main LV SWGR/MCC Substation-1 (Power Generation)
610-TRU-9001
Transformer Rectifier Unit (GPF Underground Pipeline)-1
3
F
400
VAC
3.50
300 P-620-TRU-9001
420-SWG/MCC-0003
Main LV SWGR/MCC Substation-1 (Power Generation)
620-TRU-9001
Transformer Rectifier Unit (GPF Underground Pipeline)-2
3
F
400
VAC
3.50
301 P-630-TRU-9001
420-SWG/MCC-0003
Main LV SWGR/MCC Substation-1 (Power Generation)
630-TRU-9001
Transformer Rectifier Unit (Sales Gas Metering Underground Pipeline)
3
F
400
VAC
3.50
420-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
64.00
SUBSTATION-1 (POWER GENERATION) 302 P-420-AC-UPS-0001 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
303 P-420-AC-UPS-0001 B
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
420-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
64.00
304 P-420-AC-UPS-0001 C
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
64.00
305 P-420-DC-UPS-0001 A
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DC-UPS-0001 A
110 VDC UPS System - Feeder A
3
F
400
VAC
13.78
273 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
306 P-420-DC-UPS-0001 B
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DC-UPS-0001 B
110 VDC UPS System - Feeder B
3
F
400
VAC
13.78
307 P-420-HVAC-9001
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-HVAC-9001
HVAC Package for Substation-1
3
F
400
VAC
113.20
308 P-420-HVAC-9002
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-HVAC-9002
HVAC Package for Substation-1
3
F
400
VAC
27.00
309 P-420-HVAC-9003
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-HVAC-9003
HVAC Package for Substation-1
3
F
400
VAC
27.00
310 P-420-HVAC-9004
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-HVAC-9004
HVAC Package for Substation-1
3
F
400
VAC
27.00
311 P-420-HVAC-9004
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-HVAC-6010
HVAC Auxiliary for Substation 1
3
F
400
VAC
32.20
312 P-900-LPN-4201
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
900-LPN-4201
Lighting DB (Outdoor) #1
3
F
400
VAC
46.30
313 P-420-LPN-4202
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-LPN-4202
Lighting (Indoor Substation-1) #1
3
F
400
VAC
13.80
274 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
314 P-420-DPE-0001
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation)
420-DPE-0001
Lighting (Outdoor Emergency) #1
3
F
400
VAC
7.20
315 P-900-WLO-001
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
900-WLO-001
Welding Receptacle #1
3
F
400
VAC
13.00
420-SWG/MCC-0003
Main LV Switchgear/MCC Substation-1 (Power Generation)
900-WLO-002
Welding Receptacle #2
3
F
400
VAC
13.00
316 P-900-WLO-002
Volt
kW
SUBSTATION-2 (TRAIN A AREA) 317 P-231-AC-UPS-0001 A
231-SWG/MCC-0003
Main LV Switchgear/MCC Substation-2 (Train-A)
231-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
40.00
318 P-231-AC-UPS-0001 B
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
40.00
319 P-231-AC-UPS-0001 C
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
40.00
320 P-231-DC-UPS-0001 A
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-DC-UPS-0001 A
110 VDC UPS System - Feeder A
3
F
400
VAC
10.92
275 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
321 P-231-DC-UPS-0001 B
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-DC-UPS-0001 B
110 VDC UPS System - Feeder B
3
F
400
VAC
10.92
322 P-231-HVAC-9001-01/02
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-9001
HVAC package for Substation 2
3
F
400
VAC
146.70
323 P-231-HVAC-9002
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-9002
HVAC package for Substation 2
3
F
400
VAC
34.00
324 P-231-HVAC-9003
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-9003
HVAC package for Substation 2
3
F
400
VAC
34.00
325 P-231-HVAC-9004
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-9004
HVAC package for Substation 2
3
F
400
VAC
34.00
326 P-231-HVAC-6010
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-HVAC-6010
HVAC Auxiliary for Substation 2
3
F
400
VAC
45.00
327 P-900-LPN-2311
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
900-LPN-2311
Lighting DB (Outdoor) #2
3
F
400
VAC
93.30
328 P-231-LPN-2312
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
231-LPN-2312
Lighting (Indoor Substation-2) #2
3
F
400
VAC
11.90
276 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
329 P-232-DPE-0001
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
232-DPE-0001
Lighting (Outdoor Emergency) #2
3
F
400
VAC
12.50
330 P-900-WLO-003
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
900-WLO-003
Welding Receptacle #3
3
F
400
VAC
13.00
331 P-900-WLO-004
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
900-WLO-004
Welding Receptacle #4
3
F
400
VAC
13.00
332 P-900-WLO-007
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
900-WLO-007
Welding Receptacle #7
3
F
400
VAC
13.00
333 P-900-WLO-008
231-SWG/MCC-0002
Main LV Switchgear/MCC Substation-2 (Train-A)
900-WLO-008
Welding Receptacle #8
3
F
400
VAC
13.00
Volt
kW
334
HOLD (NOTE-5)
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
HOLD (NOTE-5)
Muster Point-1 GPF
3
F
400
VAC
2.00
335
HOLD (NOTE-5)
231-SWG/MCC-0003
Essential LV Switchgear/MCC Substation-2 (Train-A)
HOLD (NOTE-5)
Muster Point-2 GPF
3
F
400
VAC
2.00
SUBSTATION-3 (TRAIN-B AREA)
277 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
336 P-280-AC-UPS-0001 A
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
32.00
337 P-280-AC-UPS-0001 B
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
32.00
338 P-280-AC-UPS-0001 C
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
32.00
339 P-280-DC-UPS-0001 A
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-DC-UPS-0001 A
110 VDC UPS System - Feeder A
3
F
400
VAC
8.06
340 P-280-DC-UPS-0001 B
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-DC-UPS-0001 B
110 VDC UPS System - Feeder B
3
F
400
VAC
8.06
341 P-290-HVAC-9001A-01/02
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
290-HVAC-9001A
HVAC package for Substation 3
3
F
400
VAC
224.20
342 P-290-HVAC-9001B
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
290-HVAC-9001B
HVAC package for Substation 3
3
F
400
VAC
71.00
343 P-290-HVAC-9001B
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
290-HVAC-9001B
HVAC package for Substation 3
3
F
400
VAC
71.00
278 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
344 P-290-HVAC-6010
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
290-HVAC-6010
HVAC Auxiliary for Substation 3
3
F
400
VAC
83.00
344 P-900-LPN-2801
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
900-LPN-2801
Lighting DB (Outdoor Substation-3)
3
F
400
VAC
58.00
345 P-900-LPN-2802
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
900-LPN-2802
Lighting (Indoor Substation-3)
3
F
400
VAC
9.80
346 P-280-DPE-0001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280-DPE-0001
Lighting (Outdoor Emergency)
3
F
400
VAC
15.00
347 P-280A-LPN-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280A-LPN-9001
Lighting & Small Power DB (Indoor Instrument Building 280A)
3
F
400
VAC
2.10
348 P-900-WLO-005
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
900-WLO-005
Welding Receptacle #5
3
F
400
VAC
13.00
349 P-900-WLO-006
280-SWG/MCC-0003
Main LV Switchgear/MCC Substation-3 (Train-B)
900-WLO-006
Welding Receptacle #6
3
F
400
VAC
13.00
SUBSTATION-4 (UTILITY AREA)
279 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
350 P-480-AC-UPS-0001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
32.00
351 P-480-AC-UPS-0001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
32.00
352 P-480-AC-UPS-0001 C
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
32.00
353 P-480-DC-UPS-0001 A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-DC-UPS-0001 A
110 VDC UPS System - Feeder A
3
F
400
VAC
5.46
354 P-480-DC-UPS-0001 B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-DC-UPS-0001 B
110 VDC UPS System - Feeder B
3
F
400
VAC
5.46
355 P-480-HVAC-9001A
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-HVAC-9001A
HVAC package for Substation 4
3
F
400
VAC
112.70
356 P-480-HVAC-9001B
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-HVAC-9001B
HVAC package for Substation 4
3
F
400
VAC
34.00
357 P-480-HVAC-9001C
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-HVAC-9001C
HVAC package for Substation 4
3
F
400
VAC
34.00
280 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
358 P-480-HVAC-9003
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-HVAC-6010
HVAC Auxiliary for Substation 4
3
F
400
VAC
45.00
358 P-900-LPN-4101
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
900-LPN-4101
Lighting DB (Outdoor Substation-4)
3
F
400
VAC
57.35
359 P-900-LPN-4102
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
900-LPN-4102
Lighting DB (Indoor Substation-4)
3
F
400
VAC
8.00
360 P-480-DPE-0001
480-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
480-DPE-0001
Lighting (Outdoor Emergency) #4
3
F
400
VAC
5.60
Volt
kW
INSTRUMENT BUILDING (280B-B-9001) 361 P-280A-HVAC-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-HVAC-9001
HVAC package for Instrument Building Train-A
3
F
400
VAC
27.00
362 P-280A-HVAC-9002
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-HVAC-9002
HVAC package for Instrument Building Train-A
3
F
400
VAC
27.00
363 P-280A-HVAC-9003
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-HVAC-9003
HVAC package for Instrument Building Train-A
3
F
400
VAC
27.00
281 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
364 P-280A-HVAC-6010
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-HVAC-6010
HVAC Aux for Instrument Building Train-A
3
F
400
VAC
86.00
365 P-280B-HVAC-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-HVAC-9001
HVAC package for Instrument Building Train-B
3
F
400
VAC
27.00
366 P-280B-HVAC-9002
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-HVAC-9002
HVAC package for Instrument Building Train-B
3
F
400
VAC
27.00
367 P-280B-HVAC-9003
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-HVAC-9003
HVAC package for Instrument Building Train-B
3
F
400
VAC
27.00
368 P-280B-HVAC-6010
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
280B-HVAC-6010
HVAC Aux for Instrument Building Train-B
3
F
400
VAC
86.00
369
HOLD (NOTE-5)
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
HOLD (NOTE-5)
Instrument Panel (Train-A)
3
F
400
VAC
20.00
370
HOLD (NOTE-5)
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
HOLD (NOTE-5)
Instrument Panel (Train-B)
3
F
400
VAC
20.00
282 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To 3 Ph / 1 Ph
F/M
Lighting (Indoor Substation-5) Train-A DP
3
F
400
VAC
7.52
280B-LPN-9001
Lighting (Indoor Substation-5) Train-B DP
3
F
400
VAC
7.52
Lighting (Outdoor Substation-5) Train-A DP
3
F
400
VAC
75.00
3
F
400
VAC
15.00
3
F
400
VAC
75.00
Equipment Tag No.
Description
Equipment Tag No.
371 P-280A-LPN-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-2 (Train-A)
280A-LPN-9001
372 P-280B-LPN-9001
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-B)
Description
Volt
kW
DEL
HOLD (NOTE-5)
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-A)
HOLD (NOTE-5)
DEL
HOLD (NOTE-5)
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-A)
HOLD (NOTE-5)
DEL
HOLD (NOTE-5)
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-A)
HOLD (NOTE-5)
DEL
HOLD (NOTE-5)
280-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-3 (Train-A)
HOLD (NOTE-5)
Lighting (Emergency Outdoor Substation-5) Train-B DP
3
F
400
VAC
15.00
373 P-450-AC-UPS-0001 A
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-AC-UPS-0001 A
230 VAC UPS System - Feeder A Control Room
3
F
400
VAC
48.00
374 P-450-AC-UPS-0001 B
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-AC-UPS-0001 B
230 VAC UPS System - Feeder B Control Room
3
F
400
VAC
48.00
Lighting (Emergency Outdoor Substation-5) Train-A DP Lighting ( Outdoor Substation-5) Train-B DP
CONTROL BUILDING
283 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
375 P-450-AC-UPS-0001 C
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass Control Room
3
F
400
VAC
48.00
376 P-450-HVAC-9001
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-9001
AHU DX
3
F
400
VAC
11.00
377 P-450-HVAC-9002
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-9002
AHU DX
3
F
400
VAC
2.20
378 P-450-HVAC-6010
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-6010
Air Conditioner Cassette Type (Total = 14 unit)
3
F
400
VAC
29.35
379 P-450-HVAC-6020
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-6020
Electric Duct Heater
3
F
400
VAC
106.03
380 P-450-HVAC-6030
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
450-HVAC-6030
AC Auxiliary
3
F
400
VAC
6.30
420-SWG/MCC-0005
Emergency LV Switchgear/MCC Substation-1 (Power Generation)
900-LPN-4103
Lighting (Indoor Control Room)
3
F
400
VAC
30.20
381 P-900-LPN-4103
INFRASTRUCTURE SUBSTATION INFRASTRUCTURE 284 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
382 P-800-AC-UPS-0001 A
800-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
800-AC-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
40.00
383 P-800-AC-UPS-0001 B
800-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
800-AC-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
40.00
384 P-800-AC-UPS-0001 C
800-SWG/MCC-0002
Essential LV Switchgear/MCC Substation-4 (Utility)
800-AC-UPS-0001 (Pass)
230 VAC UPS System - Bypass
3
F
400
VAC
40.00
385 P-800-HVAC-1001
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Substation Infrastructure HVAC #1
3
F
400
VAC
71.50
386 P-800-HVAC-1002
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Substation Infrastructure HVAC #2
3
F
400
VAC
71.50
387 P-800-HVAC-1003
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Substation Infrastructure HVAC #3
3
F
400
VAC
71.50
388 P-900-DPN-9021-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9021-01
Distribution Panel Indoor Lighting & Small Power Infrastructure Substation
3
F
400
VAC
6.20
389 P-900-DPN-9021-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9021-02
Distribution Panel Outdoor Lighting Infrastructure Substation
3
F
400
VAC
41.25
285 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
390 P-900-DPN-9021-03
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
400VAC Switchgear/MCC Infrastructure
900-DPN-9021-03
Distribution Panel Emergency Lighting Infrastructure Substation
3
F
400
VAC
10.80
Equipment Tag No.
Description
800-SWG/MCC-0002
Volt
kW
Buildings Lighting and Socket Outlet Distribution Board 391 P-900-DPN-9004-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9004-01
Distribution Panel Indoor Lighting Administration Building
3
F
400
VAC
12.40
392 P-900-DPN-9004-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9004-02
Distribution Panel Small Power Administration Building
3
F
400
VAC
35.00
393 P-900-DPN-9012A-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9012A-01
Distribution Panel Indoor Lighting Dormitory Operator & Staff
3
F
400
VAC
22.40
394 P-900-DPN-9012A-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9012A-02
Distribution Panel Small Power Dormitory Operator & Staff
3
F
400
VAC
99.00
395 P-900-DPN-9012B-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9012B-01
Distribution Panel Indoor Lighting Dormitory Field Superintendent
3
F
400
VAC
12.82
396 P-900-DPN-9012B-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9012B-02
Distribution Panel Small Power Dormitory Field Superintendent
3
F
400
VAC
54.50
286 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9013-01
Distribution Panel Indoor Lighting Sport Hall & Multipurpose Building
3
F
400
VAC
20.00
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9013-02
Distribution Panel Small Power Sport Hall & Multipurpose Building
3
F
400
VAC
60.50
399 P-900-DPN-9007-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9007-01
Distribution Panel Lighting & Small Power Mosque
3
F
400
VAC
8.00
400 P-900-DPN-9009-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9009-01
Distribution Panel Indoor Lighting Kitchen & Dining Hall
3
F
400
VAC
6.20
401 P-900-DPN-9009-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9009-02
Distribution Panel Indoor Lighting Kitchen & Dining Hall
3
F
400
VAC
11.00
402 P-900-DPN-9011-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9011-01
Distribution Panel Lighting & Small Power Laundry Center Building
3
F
400
VAC
6.40
DEL 200-9006-LP-05
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
200-9006-LP-05
Training Building Lighting DB
3
F
400
VAC
9.00
403 P-900-DPN-9011-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9011-02
Distribution Panel Indoor Lighting Medical Center Building
3
F
400
VAC
8.00
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9011-03
Distribution Panel Small Power Medical Center Building
3
F
400
VAC
12.00
Equipment Tag No.
Description
397 P-900-DPN-9013-01
398 P-900-DPN-9013-02
404 P-900-DPN-9011-03
287 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9003-01
Distribution Panel Indoor Lighting & Small Power Security Gate House
3
F
400
VAC
3.20
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9016-01
Distribution Panel Indoor Lighting Operation Maintenance Building
3
F
400
VAC
38.00
407 P-900-DPN-9016-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9016-02
Distribution Panel Small Power Operation Maintenance Building
3
F
400
VAC
39.00
408 P-900-DPN-9017-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9017-01
Distribution Panel Indoor Lighting & Small Power Chemical Storage Building
3
F
400
VAC
20.00
409 P-900-DPN-9018-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9018-01
Distribution Panel Indoor Lighting Operation Warehouse Building
3
F
400
VAC
30.00
410 P-900-DPN-9018-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9018-02
Distribution Panel Small Power Operation Warehouse Building
3
F
400
VAC
31.50
411 P-900-DPN-9004-03
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9004-03
Distribution Panel Indoor Lighting & Small Power Telcom Building
3
F
400
VAC
3.80
412 900-DPN-9001A-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9001A-01
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9001B-01
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
Equipment Tag No.
Description
405 P-900-DPN-9003-01
406 P-900-DPN-9016-01
413 900-DPN-9001B-01
288 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9001C-01
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9001D-01
Distribution Panel Indoor Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
416 900-DPN-9002-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9002-01
Distribution Panel Indoor Lighting & Small Power Guard House Building
3
F
400
VAC
3.60
417 P-900-DPN-9005-01
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9005-01
Distribution Panel Indoor Lighting Fire Emegency Station
3
F
400
VAC
2.80
418 P-900-DPN-9005-02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9005-02
Distribution Panel Small Power Fire Emegency Station
3
F
400
VAC
9.50
419 P-900-DPN-9005-03
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9005-03
Distribution Panel Indoor Lighting Office Building
3
F
400
VAC
10.00
420 P-900-DPN-9005-04
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9005-04
Distribution Panel Small Power Office Building
3
F
400
VAC
44.50
421 P-900-DPN-9005-05
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9005-05
Distribution Panel Indoor Lighting Laboratory Building
3
F
400
VAC
7.35
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9005-06
Distribution Panel Small Power Laboratory Building
3
F
400
VAC
21.00
Equipment Tag No.
Description
414 900-DPN-9001C-01
415 900-DPN-9001D-01
422 P-900-DPN-9005-06
289 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9015-01
Distribution Panel Indoor Lighting & Small Power Vehicle Fuel Station Shelter
3
F
400
VAC
1.70
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
200-9014-LP-14
Diesel Station Genset Lighting DB
3
F
400
VAC
58.03
Equipment Tag No.
Description
423 P-900-DPN-9015-01
DEL P-200-9014-LP-14
Volt
kW
424
HOLD (NOTE-5)
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Muster Point-1 Lighting DB Infrastructure Area
3
F
400
VAC
6.60
425
HOLD (NOTE-5)
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Muster Point-2 Lighting DB Infrastructure Area
3
F
400
VAC
6.60
DEL
HOLD (NOTE-5)
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Laboratory Building Sockets Outlet
3
F
400
VAC
163.20
DEL
HOLD (NOTE-5)
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Dormitory Field Manager Sockets Outlet
3
F
400
VAC
43.52
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9020
Distribution Panel Air Conditioning Laboratory Building
3
F
400
VAC
40.08
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Dormitory Field Manager AC
3
F
400
VAC
6.40
Buildings Air Conditioned Distribution Board 426 P-900-HVAC-9020
DEL
HOLD (NOTE-5)
290 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9012A-03
Distribution Panel Air Conditioning Dormitory Operator & Staff
3
F
400
VAC
21.51
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-DPN-9012B-03
Distribution Panel Air Conditioning Dormitory Field Superintendent
3
F
400
VAC
11.52
429 P-900-HVAC-9009
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9009
Distribution Panel Air Conditioning Kitchen & Dinning Hall Building
3
F
400
VAC
34.85
430 P-900-HVAC-9003
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9003
Distribution Panel Air Conditioning Security Gate House
3
F
400
VAC
10.66
431 P-900-HVAC-9007
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9007
Distribution Panel Air Conditioning Mosque
3
F
400
VAC
58.00
432 P-900-HVAC-9013
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9013
Distribution Panel Air Conditioning Sport Hall & Multipurposed Building
3
F
400
VAC
50.63
433 P-900-HVAC-9008-01/02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9008
Distribution Panel Air Conditioning Administration Building
3
F
400
VAC
93.73
434 P-900-HVAC-9005-07
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9005-07
Distribution Panel Air Conditioning Fire Emergency Station
3
F
400
VAC
32.00
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9010
Distribution Panel Air Conditioning Medical Center Building
3
F
400
VAC
23.98
Equipment Tag No.
Description
427 P-900-DPN-9012A-03
428 P-900-DPN-9012B-03
435 P-900-HVAC-9010
291 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
436 P-900-HVAC-9011
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9011
Distribution Panel Air Conditioning Laundry Center Building
3
F
400
VAC
19.00
Equipment Tag No.
Description
Volt
kW
DEL
HOLD (NOTE-5)
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Training Building AC
3
F
400
VAC
16.00
DEL
HOLD (NOTE-5)
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Recreation Center AC
3
F
400
VAC
16.00
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9016
Distribution Panel Air Conditioning Operation Maintenance Building
3
F
400
VAC
42.27
438 P-900-HVAC-9017-01/02/03
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9017
Distribution Panel Air Conditioning Chemical Storage Building
3
F
400
VAC
53.65
439 P-900-HVAC-9018-01/02
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9018
Distribution Panel Air Conditioning Operation Warehouse Building
3
F
400
VAC
66.68
437 P-900-HVAC-9016-01/02
DEL
HOLD (NOTE-5)
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Office AC
3
F
400
VAC
16.00
DEL
HOLD (NOTE-5)
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
HOLD (NOTE-5)
Diesel Station Genset
3
F
400
VAC
8.00
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9004
Distribution Panel Air Conditioning Telcom Building
3
F
400
VAC
28.90
440 P-900-HVAC-9004
292 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9005-08
Distribution Panel Air Conditioning Office Building
3
F
400
VAC
37.74
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9002A
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
443 P-900-HVAC-9002B
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9002B
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
444 P-900-HVAC-9002C
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9002C
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
445 P-900-HVAC-9002D
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9002D
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
446 P-900-HVAC-9001
800-SWG/MCC-0002
400VAC Switchgear/MCC Infrastructure
900-HVAC-9001
Distribution Panel Air Conditioning Guard House
3
F
400
VAC
3.54
447 P-211-P-9001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-P-9001
Potable Water Pump
3
M
400
VAC
0.37
DEL P-211-P-9002 A
211-SWG/MCC-0001
400VAC Switchgear/MCC Well Pad Central
211-P-9002 A
Corrosion Inhibitor Injection Pump A
3
M
400
VAC
0.00
Equipment Tag No.
Description
441 900-HVAC-9005-08
442 P-900-HVAC-9002A
Volt
kW
CENTRAL WELL PAD
293 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
DEL P-211-P-9002 B
211-SWG/MCC-0001
400VAC Switchgear/MCC Well Pad Central
211-P-9002 B
Corrosion Inhibitor Injection Pump B
3
M
400
VAC
0.00
DEL P-211-P-9003 A
211-SWG/MCC-0001
400VAC Switchgear/MCC Well Pad Central
211-P-9003 A
Methanol Injection Pump A
3
M
400
VAC
0.00
DEL P-211-P-9003 B
211-SWG/MCC-0001
400VAC Switchgear/MCC Well Pad Central
211-P-9003 B
Methanol Injection Pump B
3
M
400
VAC
0.00
448 P-211-P-9004
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-P-9004
Close Drain Pump
3
M
400
VAC
18.50
449 P-211-UPS-0001 A
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-UPS-0001 A
230 VAC UPS System - Feeder A
3
F
400
VAC
24.00
450 P-211-UPS-0001 B
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-UPS-0001 B
230 VAC UPS System - Feeder B
3
F
400
VAC
24.00
451 P-211-UPS-0001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-UPS-0001
230 VAC UPS System - Bypass
3
F
400
VAC
24.00
452 P-211-HVAC-9001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
211-HVAC-9001
Central Well Pad Substation Building HVAC #1
3
F
400
VAC
71.50
294 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
453 P-211-HVAC-9002
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
211-HVAC-9002
Central Well Pad Substation Building HVAC #2
3
F
400
VAC
71.50
454 P-211-HVAC-9003
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
211-HVAC-9003
Central Well Pad Substation Building HVAC #3
3
F
400
VAC
71.50
455 P-211-DPN-0001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-DPN-0001
Flare Package
3
F
400
VAC
3.00
456 P-211-DPN-0002
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-DPN-0002
Outdoor Lighting and Small Power
3
F
400
VAC
24.22
457 P-211-DPN-0003
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-DPN-0003
Indoor Lighting and Small Power
3
F
400
VAC
3.70
458 P-211-DPE-0001
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
211-DPE-0001
Emergency Lighting (Outdoor & Indoor)
3
F
400
VAC
7.27
211-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad Central
HOLD (NOTE-5)
Muster Point Lighting DB Central Wellpad
3
F
400
VAC
6.60
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-P-9001
Potable Water Pump
3
M
400
VAC
0.37
459
HOLD (NOTE-5)
Volt
kW
EAST WELL PAD 460 P-212-P-9001
295 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
DEL P-212-P-9002 A
212-SWG/MCC-0001
400VAC Switchgear/MCC Well Pad East
212-P-9002 A
Corrosion Inhibitor Injection Pump A
3
M
400
VAC
0.00
DEL P-212-P-9002 B
212-SWG/MCC-0001
400VAC Switchgear/MCC Well Pad East
212-P-9002 B
Corrosion Inhibitor Injection Pump B
3
M
400
VAC
0.00
DEL P-212-P-9003 A
212-SWG/MCC-0001
400VAC Switchgear/MCC Well Pad East
212-P-9003 A
Methanol Injection Pump A
3
M
400
VAC
0.00
DEL P-212-P-9003 B
212-SWG/MCC-0001
400VAC Switchgear/MCC Well Pad East
212-P-9003 B
Methanol Injection Pump B
3
M
400
VAC
0.00
461 P-212-P-9004
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-P-9004
Close Drain Pump
3
M
400
VAC
45.00
462 P-212-UPS-1004 A
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-UPS-1004 A
230 VAC UPS System - Feeder A
3
F
400
VAC
24.00
463 P-212-UPS-1004 B
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-UPS-1004 B
230 VAC UPS System - Feeder B
3
F
400
VAC
24.00
464 P-212-UPS-1004
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-UPS-1004
230 VAC UPS System - Bypass
3
F
400
VAC
24.00
296 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
465 P-212-HVAC-9001
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-HVAC-9001
East Well Pad Substation Building HVAC #1
3
F
400
VAC
71.50
466 P-212-HVAC-9002
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-HVAC-9002
East Well Pad Substation Building HVAC #2
3
F
400
VAC
71.50
467 P-212-HVAC-9003
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-HVAC-9003
East Well Pad Substation Building HVAC #3
3
F
400
VAC
71.50
468 P-212-DPN-1001
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-DPN-1001
FLARE PANEL
3
F
400
VAC
3.00
469 P-212-DPN-1002
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-DPN-1002
Outdoor Lighting and Small Power
3
F
400
VAC
36.00
470 P-212-DPN-1003
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-DPN-1003
Indoor Lighting and Small Power
3
F
400
VAC
3.70
471 P-212-DPE-0001
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
212-DPE-0001
Emergency Lighting (Outdoor & Indoor)
3
F
400
VAC
9.60
212-SWG/MCC-0002
400VAC Switchgear/MCC Well Pad East
HOLD (NOTE-5)
Muster Point Lighting DB East Wellpad
3
F
400
VAC
6.60
472
HOLD (NOTE-5)
SALES GAS METERING STATION 297 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
DEL P-710-P-MOV-A
710-SWG/MCC-0001
400VAC Switchgear/MCC Sales Gas Metering Station
710-P-MOV-A
MOV Gas Metering Stream-A Inlet Line
3
M
400
VAC
1.50
DEL P-710-P-MOV-B
710-SWG/MCC-0001
400VAC Switchgear/MCC Sales Gas Metering Station
710-P-MOV-B
MOV Gas Metering Stream-B Inlet Line
3
M
400
VAC
1.50
DEL P-710-P-MOV-C
710-SWG/MCC-0001
400VAC Switchgear/MCC Sales Gas Metering Station
710-P-MOV-C
MOV Gas Cross-over Line
3
M
400
VAC
1.50
473 P-710-P-9001
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-P-9001
Potable Water Pump
3
M
400
VAC
0.37
474 P-710-V-9004
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-V-9004
Instrument Air Compressor
3
M
400
VAC
11.00
475 P-710-AC-UPS-1001 A
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-AC-UPS-1001 A
Gas Metering 230VAC UPS System Feeder A
3
F
400
VAC
24.00
476 P-710-AC-UPS-1001 B
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-AC-UPS-1001 B
Gas Metering 230VAC UPS System Feeder B
3
F
400
VAC
24.00
477 P-710-AC-UPS-1001 C
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-AC-UPS-1001 C
Gas Metering 230VAC UPS System Bypass
3
F
400
VAC
24.00
298 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
478 P-710-HVAC-7101
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-HVAC-7101
Metering Station Building HVAC
3
F
400
VAC
5.20
479 P-710-LPN-1101
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-LPN-1101
Indoor Lighting Panel
3
F
400
VAC
16.43
480 P-710-DPN-2001
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-SO-001
Metering Station Building Socket Outlet
3
F
400
VAC
5.00
481 P-710-LPN-1201
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-LPN-1201
Outdoor Lighting Panel
3
F
400
VAC
29.00
482 P-710-DPE-0001
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-DPE-0001
Emergency Lighting Panel (Outdoor & Indoor)
3
F
400
VAC
7.00
483 P-710-LPR-1001
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
710-SO-002
Metering Station Welding Outlet
3
F
400
VAC
13.00
710-SWG/MCC-0002
400VAC Switchgear/MCC Sales Gas Metering Station
HOLD (NOTE-5)
Muster Point Sales Gas Metering Station
3
F
400
VAC
6.60
484
HOLD (NOTE-5)
299 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
D
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
(NOTE-4)
Motor Space Heater (Continuous) GPF (Qty=73 ea)
1
M
230
VAC
0.23
(NOTE-4)
Motor Space Heater (Intermittent) GPF (Qty=6 ea)
1
M
230
VAC
0.23
(NOTE-4)
Motor Space Heater (Stand-by) GPF (Qty=105 ea)
1
M
230
VAC
0.23
211-SH-1001
Space Heater for Close Drain Pump Central Wellpad
1
M
230
VAC
0.20
212-SH-1001
Space Heater for Close Drain Pump East Wellpad
1
M
230
VAC
0.20
420-SH-1011
STG-A Space Heater
1
M
230
VAC
2.25
420-SH-2011
STG-B Space Heater
1
M
230
VAC
2.25
Volt
kW
230 V POWER CABLES Space Heater
1
(NOTE-4)
420-SWG/MCC-0004
2
(NOTE-4)
420-SWG/MCC-0004
3
(NOTE-4)
420-SWG/MCC-0004
4
P-211-SH-1001
420-SWG/MCC-0004
5
P-212-SH-1001
420-SWG/MCC-0004
6
P-420-SH-1011
420-SWG/MCC-0004
7
P-420-SH-2011
420-SWG/MCC-0004
Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation) Essential LV SWGR/MCC Substation-1 (Power Generation)
230VAC UPS 300 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
SUBSTATION-1 (POWER GENERATION) 8
P-420-UCP-1001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-UCP-1001
UCP STG-A
1
F
210
VAC
1.00
9
P-420-BCH-1001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-BCH-1001
Battery Charger STG-A
1
F
210
VAC
1.00
10
P-420-UCP-4001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-UCP-4001
UCP Essential Generator
1
F
210
VAC
1.00
11
P-420-BCH-4001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-BCH-4001
Battery Charger Essential Generator
1
F
210
VAC
1.00
12
P-420-VCB-0001
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-VCB-0001
Motor Charging VCB for 420-SWG-0001
1
M
210
VAC
1.80
13
P-420-VCB-0002
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
420-VCB-0002
Motor Charging VCB for 420-SWG-0002
1
M
210
VAC
3.00
14
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O
1
F
210
VAC
0.50
15
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
1.00
301 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
16
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
ECMS NETWORK SERVER
1
F
210
VAC
1.00
17
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
ECMS PRINTER
1
F
210
VAC
0.50
18
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
LCP STG-A
1
F
210
VAC
1.00
19
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
SIS REMOTE I/O
1
F
210
VAC
0.70
20
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O
1
F
210
VAC
0.20
21
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
LOAD SHEDDING PANEL-A
1
F
210
VAC
1.00
22
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
EMERGENCY LIGHTING DB (outdoor & indoor)
1
F
210
VAC
7.20
23
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
TELECOM CABINET
1
F
210
VAC
1.00
24
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
HP BOILER CABINET
1
F
210
VAC
1.00
302 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
25
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
LP BOILER CABINET
1
F
210
VAC
1.00
26
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
MAIN ECMS-A PANEL
1
F
210
VAC
1.50
27
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
28
HOLD (NOTE-5)
420-AC-UPS-0001A
230 VAC UPS System Power Generation Area (Bus-A)
HOLD (NOTE-5)
FACP CABINET
1
F
210
VAC
0.50
29
P-420-UCP-2001
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-UCP-2001
UCP STG-B
1
F
210
VAC
1.00
30
P-420-BCH-2001
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-BCH-2001
Battery Charger STG-B
1
F
210
VAC
1.00
31
P-420-UCP-5001
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-UCP-5001
UCP Emergency Generator
1
F
210
VAC
1.00
32
P-420-BCH-5001
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-BCH-5001
Battery Charger Emergency Generator
1
F
210
VAC
0.50
303 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
33
P420-VCB-0003
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-VCB-0003
Motor Charging VCB for 420-SWG-0003
1
M
210
VAC
0.30
34
P420-VCB-0004
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-VCB-0004
Motor Charging VCB for 420-SWG-0004
1
M
210
VAC
0.50
35
P420-VCB-0005
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
420-VCB-0005
Motor Charging VCB for 420-SWG-0005
1
M
210
VAC
0.30
36
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
PCS REMOTE I/O
1
F
210
VAC
0.50
37
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
SIS REMOTE I/O
1
F
210
VAC
0.70
38
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
F&G REMOTE I/O
1
F
210
VAC
0.20
39
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
ECMS OPC SERVER
1
F
210
VAC
1.00
40
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
LCP STG-B
1
F
210
VAC
1.00
41
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
LCP ESSENTIAL GEN
1
F
210
VAC
1.00
304 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
42
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
ECMS WORK STATION
1
F
210
VAC
1.00
43
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
ECMS NETWORK SWITCH
1
F
210
VAC
0.20
44
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
LOAD SHEDDING PANEL-B
1
F
210
VAC
1.00
45
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
TELECOM CABINET
1
F
210
VAC
1.00
46
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
HP BOILER CABINET
1
F
210
VAC
1.00
47
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
LP BOILER CABINET
1
F
210
VAC
1.00
48
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
MAIN ECMS-B PANEL
1
F
210
VAC
1.50
49
HOLD (NOTE-5)
420-AC-UPS-0001 B
230 VAC UPS System Power Generation Area (Bus-B)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
SUBSTATION-2 (TRAIN A AREA) 305 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
50
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
Motor Charging VCB : 231-SWG-0001
1
M
210
VAC
2.20
51
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
Motor Charging ACB : 231-SWG-0002
1
M
210
VAC
0.30
52
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
53
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
0.40
54
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
55
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
56
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL
1
F
210
VAC
0.50
57
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
58
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
306 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
59
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
VRU LCP
1
F
210
VAC
0.50
60
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
61
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
RECYLE GAS COMPRESSOR LCP
1
F
210
VAC
0.50
62
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
HP/LP A FLARE LCP
1
F
210
VAC
1.00
63
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
SALES GAS COMPRESSOR LCP
1
F
210
VAC
1.00
64
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
TEG LCP
1
F
210
VAC
0.50
65
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
SRU LCP
1
F
210
VAC
0.50
66
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
TGU LCP
1
F
210
VAC
0.50
67
HOLD (NOTE-5)
231-AC-UPS-0001A
230 VAC UPS System Train-A Area (Bus-A)
HOLD (NOTE-5)
UPS DB at Instrument Building 280A-B-9001
1
F
210
VAC
3.50
307 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
68
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
Motor Charging VCB : 231-SWG-0003
1
M
210
VAC
0.50
69
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
70
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
71
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
VRU LCP
1
F
210
VAC
0.50
72
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
ECMS WORKSTATION
1
F
210
VAC
0.50
73
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
0.20
74
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
EMERGENCY LIGHTING DB (outdoor & indoor)
1
F
210
VAC
8.80
75
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL
1
F
210
VAC
0.50
308 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
76
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
Motor Charging VCB : 231-SWG-0004
1
M
210
VAC
0.30
77
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
78
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
79
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
80
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
81
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
RECYLE GAS COMPRESSOR LCP
1
F
210
VAC
0.50
82
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
SALES GAS COMPRESSOR LCP
1
F
210
VAC
1.00
83
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
TEG LCP
1
F
210
VAC
0.50
84
HOLD (NOTE-5)
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
SRU LCP
1
F
210
VAC
0.50
309 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
85
HOLD (NOTE-5)
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-AC-UPS-0001B
230 VAC UPS System Train-A Area (Bus-B)
HOLD (NOTE-5)
TGU LCP
1
F
210
VAC
0.50
Volt
kW
SUBSTATION-3 (TRAIN-B AREA) 86
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
Motor Charging VCB 280-SWG-0001
1
M
210
VAC
1.40
87
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
Motor Charging ACB : 280-SWG-0002
1
M
210
VAC
0.50
88
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
89
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
1.00
90
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
91
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
92
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL (280A-B9001)
1
F
210
VAC
0.50
310 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
93
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
94
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
95
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
0.20
96
HOLD (NOTE-5)
280-AC-UPS-0001A
230 VAC UPS System Train-B Area (Bus-A)
HOLD (NOTE-5)
UPS DB at Instrument Building 280B-B-9001
1
F
210
VAC
3.50
97
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
Motor Charging VCB : 280-SWG-0003
1
M
210
VAC
0.30
98
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL (280A-B9001)
1
F
210
VAC
0.50
99
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
100
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
311 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
101
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
ECMS WORKSTATION
1
F
210
VAC
0.50
102
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
0.80
103
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
EMERGENCY LIGHTING DB (outdoor & indoor)
1
F
210
VAC
10.40
104
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
105
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
106
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
107
HOLD (NOTE-5)
280-AC-UPS-0001B
230 VAC UPS System Train-B Area (Bus-B)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
Motor Charging VCB 480-SWG-0001
1
M
210
VAC
2.00
SUBSTATION-4 (UTILITY AREA) 108
HOLD (NOTE-5)
312 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
109
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
Motor Charging ACB : 480-SWG-0002
1
M
210
VAC
0.30
110
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
111
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
1.00
112
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
113
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
INSTRUMENT AIR COMPRESSORA LCP
1
F
210
VAC
1.00
114
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
INSTRUMENT AIR COMPRESSORB LCP
1
F
210
VAC
1.00
115
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
INSTRUMENT AIR COMPRESSORC LCP
1
F
210
VAC
1.00
116
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL
1
F
210
VAC
0.50
117
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
313 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
118
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
EMERGENCY LIGHTING DB (outdoor & indoor)
1
F
210
VAC
4.00
119
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
REMOTE I/O ECMS-A PANEL
1
F
210
VAC
0.50
120
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
121
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
0.20
122
HOLD (NOTE-5)
480-AC-UPS-0001A
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
123
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
AIR MANAGER LCP
1
F
210
VAC
0.50
124
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
SIS REMOTE I/O PANEL
1
F
210
VAC
0.50
125
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
0.20
314 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
126
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
ECMS PANEL
1
F
210
VAC
0.50
127
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
ECMS WORKSTATION
1
F
210
VAC
0.50
128
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
1.00
129
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
INSTRUMENT AIR DRYER-A LCP
1
F
210
VAC
1.00
130
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
INSTRUMENT AIR DRYER-B LCP
1
F
210
VAC
1.00
131
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
INSTRUMENT AIR DRYER-C LCP
1
F
210
VAC
1.00
132
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
FIRE WATER PANEL BATTERY CHARGER-A
1
F
210
VAC
1.00
133
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
FIRE WATER PANEL BATTERY CHARGER-B
1
F
210
VAC
1.00
134
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
PCS REMOTE I/O PANEL
1
F
210
VAC
0.50
315 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
135
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
TELECOM CABINET
1
F
210
VAC
1.00
136
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-B)
HOLD (NOTE-5)
REMOTE I/O ECMS-B PANEL
1
F
210
VAC
0.50
137
HOLD (NOTE-5)
480-AC-UPS-0001B
230 VAC UPS System Utility Area (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
0.50
CONTROL BUILDING 138
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
PCS SYSTEM CABINET
1
F
210
VAC
1.00
139
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
SIS SYSTEM CABINET
1
F
210
VAC
0.50
140
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
F&G SYSTEM CABINET
1
F
210
VAC
0.20
141
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
142
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
LDS SYSTEM COMPUTER
1
F
210
VAC
0.65
316 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
143
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
OFFICE APPLICATION COMPUTER
1
F
210
VAC
0.65
144
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
MM SERVER
1
F
210
VAC
0.65
145
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
PROCESS MONITORING COMP
1
F
210
VAC
0.65
146
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
RTS SERVER
1
F
210
VAC
0.65
147
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
FO BACKBONE PATCH PANEL
1
F
210
VAC
2.00
148
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
MOM SYSTEM CABINET 2
1
F
210
VAC
0.65
149
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
SOE WORKSTATION
1
F
210
VAC
0.65
150
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
F&G MONITOR WORKSTATION
1
F
210
VAC
0.40
151
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
FIRE STATION MONITOR
1
F
210
VAC
0.40
317 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
152
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
HVAC CONTROL PANEL
1
F
210
VAC
0.60
153
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
ECMS-A PANEL
1
F
210
VAC
0.50
154
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
ECMS-A WORKSTATION
1
F
210
VAC
0.65
155
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
CWE SYSTEM CABINET
1
F
210
VAC
1.00
156
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
MOM SYSTEM CABINET 1
1
F
210
VAC
1.00
157
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
1.00
158
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Control Building (Bus-A)
HOLD (NOTE-5)
OPERATOR TRAINING SYSTEM CABINET
1
F
210
VAC
0.60
159
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PCS SYSTEM CABINET
1
F
210
VAC
1.00
318 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
160
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
SIS SYSTEM CABINET
1
F
210
VAC
0.50
161
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
F&G SYSTEM CABINET
1
F
210
VAC
0.20
162
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
FACP PANEL
1
F
210
VAC
0.50
163
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
CCTV SERVER
1
F
210
VAC
0.65
164
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
EDMS SERVER
1
F
210
VAC
1.30
165
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
MIS BACK-UP SERVER
1
F
210
VAC
0.65
166
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
APMS SERVER
1
F
210
VAC
0.65
167
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
EPMS SERVER
1
F
210
VAC
0.65
168
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
HISTORIAN OPC SERVER
1
F
210
VAC
1.30
319 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
169
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PRINTER
1
F
210
VAC
0.69
170
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
FO BACKBONE PATCH PANEL
1
F
210
VAC
1.00
171
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
CCTV SYSTEM
1
F
210
VAC
1.50
172
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
CCTV MONITOR
1
F
210
VAC
0.80
173
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PAGA STATION
1
F
210
VAC
0.40
174
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PCS PLASMA TV
1
F
210
VAC
1.87
175
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
MOM SYSTEM CABINET 2
1
F
210
VAC
0.65
176
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
1.60
177
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
SIS CONSOLE
1
F
210
VAC
0.30
320 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
178
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
F&G CONSOLE
1
F
210
VAC
0.30
179
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
ECMS-B PANEL
1
F
210
VAC
0.50
180
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PCS EWS
1
F
210
VAC
0.40
181
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
ESD/F&G EWS
1
F
210
VAC
0.40
182
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
AMS EWS
1
F
210
VAC
0.40
183
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
CWE SYSTEM CABINET
1
F
210
VAC
1.00
184
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
MOM SYSTEM CABINET 1
1
F
210
VAC
1.00
185
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
OPERATOR TRAINING SYSTEM CABINET
1
F
210
VAC
0.60
186
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Control Building (Bus-B)
HOLD (NOTE-5)
PAGA CABINET
1
F
210
VAC
1.00
321 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
HOLD (NOTE-5)
EMERGENCY LIGHTING DB (outdoor & indoor) 211-DPE-0001
1
F
210
VAC
10.80
Volt
kW
INFRASTRUCTURE AREA SUBSTATION 187
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
188
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
800-SWG/MCC-0001 A
11 kV Switchgear Infrastructure Substation (BUS A)
1
F
210
VAC
0.50
189
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
800-BCH-5001
Back-Up Genset Charger
1
F
210
VAC
0.75
190
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
800-SWG/MCC-0002 A
400 VAC Switchgear/MCC Infrastructure Substation (BUS A)
1
F
210
VAC
1.00
191
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
ECMS Panel
1
F
210
VAC
0.50
192
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
ECMS Workstation
1
F
210
VAC
0.50
193
HOLD (NOTE-5)
800-AC-UPS-0001A
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
2.00
322 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
194
HOLD (NOTE-5)
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
HOLD (NOTE-5)
Telecom UPS DB
1
F
210
VAC
13.40
195
HOLD (NOTE-5)
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
800-BCH-5001
Back-Up Genset Charger
1
F
210
VAC
0.75
196
HOLD (NOTE-5)
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
800-SWG/MCC-0002 B
400 VAC Switchgear/MCC Infrastructure Substation (BUS B)
1
F
210
VAC
1.00
197
HOLD (NOTE-5)
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
HOLD (NOTE-5)
ECMS Panel
1
F
210
VAC
0.50
198
HOLD (NOTE-5)
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-B)
800-SWG/MCC-0001 B
11 kV Switchgear Infrastructure Substation (BUS B)
1
F
210
VAC
0.50
199
HOLD (NOTE-5)
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
NETWORK SWITCH
1
F
210
VAC
2.00
200
HOLD (NOTE-5)
800-AC-UPS-0001B
230 VAC UPS System Infrastructure Area (Bus-A)
HOLD (NOTE-5)
F&G REMOTE I/O PANEL
1
F
210
VAC
2.00
230 VAC UPS System Central Wellpad (Bus-A)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
0.50
CENTRAL WELLPAD SUBSTATION 201
HOLD (NOTE-5)
211-AC-UPS-0001A
323 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
202
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.50
203
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
HOLD (NOTE-5)
Flow Comp Cabinet
1
F
210
VAC
0.50
204 P-211-SWG/MCC-0002
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
211-SWG-MCC-0002 A
400 VAC Switchgear/MCC Well Pad Central (BUS A)
1
F
210
VAC
1.00
205 P-211-ECMS-0001 A
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
211-ECMS-0001 A
ECMS Panel
1
F
210
VAC
0.50
206 P-211-ECMS-0002
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
P-211-ECMS-0002
ECMS PC
1
F
210
VAC
0.50
207 P-211-SWG/MCC-0001
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
211-SWG-MCC-0001 A
11 kV Switchgear Central Well Pad Substation (BUS A)
1
F
210
VAC
0.50
208
HOLD (NOTE-5)
211-AC-UPS-0001A
230 VAC UPS System Central Wellpad (Bus-A)
HOLD (NOTE-5)
Back-Up Genset Charger
1
F
210
VAC
0.75
209
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
324 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
210
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.50
211
HOLD (NOTE-5)
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
HOLD (NOTE-5)
Flow Comp Cabinet
1
F
210
VAC
0.30
212 P-211-SWG-MCC-0002 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-SWG-MCC-0002 B
400 VAC Switchgear/MCC Well Pad Central (BUS B)
1
F
210
VAC
0.75
213 P-211-ECMS-0001 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-ECMS-0001 B
ECMS Panel
1
F
210
VAC
0.50
214 P-211-SWG-MCC-0001 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-SWG-MCC-0001 B
11 kV Switchgear Central Well Pad Substation (BUS B)
1
F
210
VAC
0.50
215 P-211-DPE-0001A
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-DPE-0001
Emergency Lighting (Outdoor & Indoor)
1
F
210
VAC
5.60
216 C-211-DPN-1001
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-DPN-1001
FLARE PANEL
1
F
210
VAC
0.50
217 C-211-HVAC-9004
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-HVAC-9004
HVAC CONTROL PANEL
1
F
210
VAC
0.50
EAST WELLPAD SUBSTATION 325 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
218
HOLD (NOTE-5)
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
219
HOLD (NOTE-5)
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.50
220
HOLD (NOTE-5)
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
HOLD (NOTE-5)
Flow Comp Cabinet
1
F
210
VAC
0.30
221 P-212-SWG-MCC-0002 A
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-SWG-MCC-0002 A
400 VAC Switchgear/MCC East Well Pad Substation (BUS A)
1
F
210
VAC
0.75
222 P-212-ECMS-0001 A
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-ECMS-0001 A
ECMS Panel
1
F
210
VAC
0.50
223 P-212-ECMS-0002
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-ECMS-0002
ECMS PC
1
F
210
VAC
0.50
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
212-SWG-MCC-0001 A
11 kV Switchgear East Well Pad Substation (BUS A)
1
F
210
VAC
0.50
212-AC-UPS-0001A
230 VAC UPS System East Wellpad (Bus-A)
HOLD (NOTE-5)
Back-Up Genset Charger
1
F
210
VAC
0.75
224 P-212-SWG-MCC-0001 A
225
HOLD (NOTE-5)
326 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
226
HOLD (NOTE-5)
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
227
HOLD (NOTE-5)
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.50
228
HOLD (NOTE-5)
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
HOLD (NOTE-5)
Flow Comp Cabinet
1
F
210
VAC
0.30
229 P-212-SWG-MCC-0002 B
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
212-SWG-MCC-0002 B
400 VAC Switchgear/MCC East Well Pad Substation (BUS B)
1
F
210
VAC
0.75
230 P-212-ECMS-0001 B
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
212-ECMS-0001 B
ECMS Panel
1
F
210
VAC
0.50
231 P-212-SWG-MCC-0001 B
212-AC-UPS-0001B
230 VAC UPS System East Wellpad (Bus-B)
212-SWG-MCC-0001 B
11 kV Switchgear East Well Pad Substation (BUS B)
1
F
210
VAC
0.50
232 P-212-DPE-0001
212-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
212-DPE-0001
EMERGENCY LIGHTING DB (outdoor & indoor) 212-DPE-0001
1
F
210
VAC
9.60
233 C-212-DPN-1001
212-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
212-DPN-1001
FLARE PANEL
1
F
210
VAC
0.50
234 C-212-HVAC-9004
212-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
212-HVAC-9004
HVAC CONTROL PANEL
1
F
210
VAC
0.50
327 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
SALES GAS METERING SUBSTATION 235
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
236
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.40
237
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
Flow Computer System
1
F
210
VAC
1.80
238
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
Laser Jet Printer
1
F
210
VAC
0.50
239
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
Sales Gas Ccmputer
1
F
210
VAC
0.70
240
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
ECMS PC
1
F
210
VAC
0.50
241
HOLD (NOTE-5)
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
HOLD (NOTE-5)
ECMS Panel
1
F
210
VAC
0.50
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
710-BCH-5001
Back-Up Genset Charger
1
F
210
VAC
0.75
242 C-710-BCH-5001
328 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
710-BCH-5001
400 VAC Switchgear/MCC Sales Gas Metering Substation (BUS A)
1
F
210
VAC
0.50
244 C-710-SWG-0001A
710-AC-UPS-0001A
230 VAC UPS System Sales Gas Metering (Bus-A)
710-SWG/MCC-0002
11 kV Switchgear Sales Gas Metering Substation (BUS A)
1
F
210
VAC
0.50
245
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
Telecom Cabinet
1
F
210
VAC
2.00
246
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
RTU/SCADA Cabinet
1
F
210
VAC
0.40
247
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
Dot Maztrix Printer
1
F
210
VAC
0.10
248
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
Flow Computer System
1
F
210
VAC
1.80
249
HOLD (NOTE-5)
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
HOLD (NOTE-5)
ECMS Panel
1
F
210
VAC
0.50
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-UCP-5001
Back-Up Genset UCP
1
F
210
VAC
0.75
Equipment Tag No.
Description
243 C-710-SWG/MCC-0002A
250 C-211-ECMS-0002
329 of 522
Volt
kW
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
251 C-710-DPE-0001
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-DPE-0001
EMERGENCY LIGHTING DB (outdoor & indoor)
1
F
210
VAC
4.00
252 C-710-HVAC-7101
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-HVAC-7101
HVAC CONTROL PANEL
1
F
210
VAC
0.50
253 C-710-SWG/MCC-0002A
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-BCH-5001
400 VAC Switchgear/MCC Sales Gas Metering Substation (BUS B)
1
F
210
VAC
0.50
254 C-710-SWG-0001A
710-AC-UPS-0001B
230 VAC UPS System Sales Gas Metering (Bus-B)
710-SWG/MCC-0002
11 kV Switchgear Sales Gas Metering Substation (BUS B)
1
F
210
VAC
0.50
Volt
kW
710-SWG-0001
E
DC POWER CABLES DC UPS SUBSTATION-1 (POWER GENERATION)
1
C-420-SWG/MCC-0001A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0001A
11 kV Switchgear: 420-SWG-0001A
1
F
108
VDC
1.00
2
C-420-SWG/MCC-0001B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0001B
11 kV Switchgear: 420-SWG-0001B
1
F
108
VDC
1.00
330 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
3
C-420-SWG/MCC-0003A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0003A
400 VAC MCC : 420-MCC-0003A
1
F
108
VDC
1.00
4
C-420-SWG/MCC-0003B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0003B
400 VAC MCC : 420-MCC-0003B
1
F
108
VDC
1.00
5
C-420-SWG/MCC-0005A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0005A
400 VAC MCC : 420-MCC-0005A
1
F
108
VDC
1.00
6
C-420-SWG/MCC-0004A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0004A
400 VAC MCC : 420-MCC-0004A
1
F
108
VDC
1.00
7
C-420-SWG/MCC-0004B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0004B
400 VAC MCC : 420-MCC-0004B
1
F
108
VDC
1.00
8
C-420-SWG/MCC-0005B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0005B
400 VAC MCC : 420-MCC-0005B
1
F
108
VDC
1.00
9
C-420-SWG/MCC-0002A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0002A
6,6 kV Switchgear: 420-SWG-0002A
1
F
108
VDC
1.00
10
C-420-SWG/MCC-0002B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-SWG/MCC-0002B
6,6 kV Switchgear: 420-SWG-0002B
1
F
108
VDC
1.00
11
C-420-TRF-0001A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0001A
TRAFO 420-TRF-0001A
1
F
108
VDC
0.10
331 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
12
C-420-TRF-0001B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0001B
TRAFO 420-TRF-0001B
1
F
108
VDC
0.10
13
C-420-TRF-0002A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0002A
TRAFO 420-TRF-0002A
1
F
108
VDC
0.10
14
C-420-TRF-0002B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0002B
TRAFO 420-TRF-0002B
1
F
108
VDC
0.10
15
C-420-TRF-0003A
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0003A
TRAFO 420-TRF-0003A
1
F
108
VDC
0.10
16
C-420-TRF-0003B
420-DC-UPS-0001
110 VDC UPS System Power Generation Substation
420-TRF-0003B
TRAFO 420-TRF-0003B
1
F
108
VDC
0.10
SUBSTATION-2 (TRAIN-A AREA) 17
C-231-SWG/MCC-0001A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0001 (BUS A)
6.6 kV Switchgear / MCC MV 1A Substation-2 (Train-A)
1
F
108
VDC
1.00
18
C-231-SWG/MCC-0001B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0001 (BUS B)
6.6 kV Switchgear / MCC MV 1B Substation-2 (Train-A)
1
F
108
VDC
1.00
332 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
19
C-231-SWG/MCC-0002A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0002 (BUS A)
400 VAC Switchgear / MCC LV 2A Substation-2 (Train-A)
1
F
108
VDC
1.00
20
C-231-SWG/MCC-0002B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0002 (BUS B)
400 VAC Switchgear / MCC LV 2B Substation-2 (Train-A)
1
F
108
VDC
1.00
21
C-231-SWG/MCC-0003A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0003 (BUS A)
400 VAC Switchgear / MCC LV 3A Substation-2 (Train-A)
1
F
108
VDC
1.00
22
C-231-SWG/MCC-0003B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0003 (BUS B)
400 VAC Switchgear / MCC LV 3B Substation-2 (Train-A)
1
F
108
VDC
1.00
23
C-231-SWG/MCC-0004A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0004 (BUS A)
400 VAC Switchgear / MCC LV 4A Substation-2 (Train-A)
1
F
108
VDC
1.00
24
C-231-SWG/MCC-0004B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-SWG/MCC-0004 (BUS B)
400 VAC Switchgear / MCC LV 4B Substation-2 (Train-A)
1
F
108
VDC
1.00
25
C-231-TRF-0001A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-TRF-0001A
TRAFO 231-TRF-0001A
1
F
108
VDC
0.10
26
C-231-TRF-0001B
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-TRF-0001B
TRAFO 231-TRF-0001B
1
F
108
VDC
0.10
27
C-231-TRF-0002A
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-TRF-0002A
TRAFO 231-TRF-0002A
1
F
108
VDC
0.10
333 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
28
C-231-TRF-0002B
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
231-DC-UPS-0001
110 VDC UPS System Train-A Substation
231-TRF-0002B
TRAFO 231-TRF-0002B
1
F
108
VDC
0.10
Volt
kW
SUBSTATION-3 (TRAIN-B AREA) 29
C-280-SWG/MCC-0001A
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0001A
6,6 kV Switchgear: 280-SWG-0001A
1
F
108
VDC
1.00
30
C-280-SWG/MCC-0001B
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0001B
6,6 kV Switchgear: 280-SWG-0001B
1
F
108
VDC
1.00
31
C-280-SWG/MCC-0002A
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0002A
400 VAC MCC : 280-MCC-0002A
1
F
108
VDC
1.00
32
C-280-SWG/MCC-0002B
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0002B
400 VAC MCC : 280-MCC-0002B
1
F
108
VDC
1.00
33
C-280-SWG/MCC-0003A
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0003A
400 VAC MCC : 280-MCC-0003A
1
F
108
VDC
1.00
34
C-280-SWG/MCC-00013
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-SWG/MCC-0003B
400 VAC MCC : 280-MCC-0003B
1
F
108
VDC
1.00
35
C-280-TRF-0001A
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-TRF-0001A
TRAFO 280-TRF-0001A
1
F
108
VDC
0.10
334 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
36
C-280-TRF-0001B
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
280-DC-UPS-0001
110 VDC UPS System Train-B Substation
280-TRF-0001B
TRAFO 280-TRF-0001B
1
F
108
VDC
0.10
Volt
kW
SUBSTATION-4 (UTILITY AREA) 37
C-480-SWG/MCC-0001A
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-SWG/MCC-0001A
6,6 kV Switchgear: 480-SWG-0001A
1
F
108
VDC
1.00
38
C-480-SWG/MCC-0001B
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-SWG/MCC-0001B
6,6 kV Switchgear: 480-SWG-0001B
1
F
108
VDC
1.00
39
C-480-SWG/MCC-0002A
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-SWG/MCC-0002A
400 VAC MCC : 480-MCC-0002A
1
F
108
VDC
1.00
40
C-480-SWG/MCC-0002B
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-SWG/MCC-0002B
400 VAC MCC : 480-MCC-0002B
1
F
108
VDC
1.00
41
C-480-TRF-0001A
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-TRF-0001A
TRAFO 480-TRF-0001A
1
F
108
VDC
0.10
42
C-480-TRF-0001B
480-DC-UPS-0001
110 VDC UPS System Utility Substation
480-TRF-0001B
TRAFO 480-TRF-0001B
1
F
108
VDC
0.10
BATTERY RACK FOR UPS GPF 230 VAC UPS 335 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
43
P-420-BAT-0001 A-01/02
420-AC-UPS-0001 A
Substation-1 230 VAC UPS System Feeder A
420-BAT-0001 A
Battery Rack for Substation-1 230 VAC UPS System - Feeder A
1
F
220
VDC
61.04
44
P-420-BAT-0001 B-01/02
420-AC-UPS-0001 B
Substation-1 230 VAC UPS System Feeder B
420-BAT-0001 B
Battery Rack for Substation-1 230VAC UPS System - Feeder B
1
F
220
VDC
61.04
45
P-231-BAT-0001 A
231-AC-UPS-0001 A
Substation-2 230 VAC UPS System Feeder A
231-BAT-0001 A
Battery Rack for Substation-2 230 VAC UPS System - Feeder A
1
F
220
VDC
25.43
46
P-231-BAT-0001 B
231-AC-UPS-0001 B
Substation-2 230VAC UPS System Feeder B
231-BAT-0001 B
Battery Rack for Substation-2 230VAC UPS System - Feeder B
1
F
220
VDC
25.43
47
P-280-BAT-0001 A
280-AC-UPS-0001 A
Substation-3 230VAC UPS System Feeder A
280-BAT-0001 A
Battery Rack for Substation-3 230 VAC UPS System - Feeder A
1
F
220
VDC
27.88
48
P-280-BAT-0001 B
280-AC-UPS-0001 B
Substation-3 230VAC UPS System Feeder B
280-BAT-0001 B
Battery Rack for Substation-3 230VAC UPS System - Feeder B
1
F
220
VDC
27.88
49
P-480-BAT-0001 A
480-AC-UPS-0001 A
Substation-4 230 VAC UPS System Feeder A
480-BAT-0001 A
Battery Rack for Substation-4 230 VAC UPS System - Feeder A
1
F
220
VDC
27.88
50
P-480-BAT-0001 B
480-AC-UPS-0001 B
Substation-4 230 VAC UPS System Feeder B
480-BAT-0001 B
Battery Rack for Substation-4 230VAC UPS System - Feeder B
1
F
220
VDC
27.88
51
P-410-BAT-0001 A-01/02
410-AC-UPS-0001 A
Control Building 230 VAC UPS System - Feeder A
410-BAT-0001 A
Battery Rack for Control Building 230 VAC UPS System - Feeder A
1
F
220
VDC
53.10
336 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
52
P-410-BAT-0001 B-01/02
410-AC-UPS-0001 B
Control Building 230 VAC UPS System - Feeder B
410-BAT-0001 B
Battery Rack for Control Building 230VAC UPS System - Feeder B
1
F
220
VDC
53.10
53
P-800-BAT-0001 A-01/02
800-AC-UPS-0001 A
Infrastructure 230 VAC UPS System Feeder A
800-BAT-0001 A
Battery Rack for Infrastructure 230 VAC UPS System - Feeder A
1
F
220
VDC
53.10
54
P-800-BAT-0001 B-01/02
800-AC-UPS-0001 B
Infrastructure 230 VAC UPS System Feeder B
800-BAT-0001 B
Battery Rack for Infrastructure 230VAC UPS System - Feeder B
1
F
220
VDC
53.10
55
P-211-BAT-0001 A
211-AC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
211-BAT-0001 A
Battery Rack for Central Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
56
P-211-BAT-0001 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-BAT-0001 B
Battery Rack for Central Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
230 VAC UPS System Central Wellpad (Bus-B) 57
P-212-BAT-0001 A
212-UPS-1004 A
230 VAC UPS System Central Wellpad (Bus-B)
212-BAT-0001 A
Battery Rack for East Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
58
P-212-BAT-0001 B
212-UPS-1004 B
230 VAC UPS System Central Wellpad (Bus-B)
212-BAT-0001 B
Battery Rack for East Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
230 VAC UPS System Central Wellpad (Bus-B) 337 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
59 P-710-BAT-1001 A
710-AC-UPS-1001 A
230 VAC UPS System Central Wellpad (Bus-B)
710-BAT-1001 A
Battery Rack for Gas Metering 230 VAC UPS System - Feeder A
1
F
220
VDC
20.44
60 P-710-BAT-1001 B
710-AC-UPS-1001 B
230 VAC UPS System Central Wellpad (Bus-B)
710-BAT-1001 B
Battery Rack for Gas Metering 230VAC UPS System - Feeder B
1
F
220
VDC
20.44
Volt
kW
230 VAC UPS System Central Wellpad (Bus-B) 230 VAC UPS System Central Wellpad (Bus-B)
GPF 110 VDC UPS 61
P-420-BAT-0002A
420-DC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
420-BAT-0002 A
Battery Rack for Substation-1 110 VDC UPS System - Feeder A
1
F
110
VDC
20.35
62
P-420-BAT-0002 B
420-DC-UPS-0001 B
230 VAC UPS System Central Wellpad (Bus-B)
420-BAT-0002 B
Battery Rack for Substation-1 110VDC UPS System - Feeder B
1
F
110
VDC
20.35
63
P-231-BAT-0002 A
231-DC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
231-BAT-0002 A
Battery Rack for Substation-2 110 VDC UPS System - Feeder A
1
F
110
VDC
16.48
64
P-231-BAT-0002 B
231-DC-UPS-0001 B
230 VAC UPS System Central Wellpad (Bus-B)
231-BAT-0002 B
Battery Rack for Substation-2 110VDC UPS System - Feeder B
1
F
110
VDC
16.48
65
P-280-BAT-0002 A
280-DC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
280-BAT-0002 A
Battery Rack for Substation-3 110 VDC UPS System - Feeder A
1
F
110
VDC
12.72
66
P-280-BAT-0002 B
280-DC-UPS-0001 B
230 VAC UPS System Central Wellpad (Bus-B)
280-BAT-0002 B
Battery Rack for Substation-3 110VDC UPS System - Feeder B
1
F
110
VDC
12.72
338 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
67
P-480-BAT-0002 A
480-DC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
480-BAT-0002 A
Battery Rack for Substation-4 110 VDC UPS System - Feeder A
1
F
110
VDC
8.85
68
P-480-BAT-0002 B
480-DC-UPS-0001 B
230 VAC UPS System Central Wellpad (Bus-B)
480-BAT-0002 B
Battery Rack for Substation-4 110VDC UPS System - Feeder B
1
F
110
VDC
8.85
230 VAC UPS System Central Wellpad (Bus-B) 230 VAC UPS System Central Wellpad (Bus-B)
WELLPAD 230 VAC UPS 69
P-211-BAT-0001 A
211-AC-UPS-0001 A
230 VAC UPS System Central Wellpad (Bus-B)
211-BAT-0001 A
Battery Rack for Central Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
70
P-211-BAT-0001 B
211-AC-UPS-0001B
230 VAC UPS System Central Wellpad (Bus-B)
211-BAT-0001 B
Battery Rack for Central Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
71
P-212-BAT-0001 A
212-UPS-1004 A
230 VAC UPS System Central Wellpad (Bus-B)
212-BAT-0001 A
Battery Rack for East Wellpad 230 VAC UPS System - Feeder A
1
F
220
VDC
17.71
72
P-212-BAT-0001 B
212-UPS-1004 B
230 VAC UPS System Central Wellpad (Bus-B)
212-BAT-0001 B
Battery Rack for East Wellpad 230VAC UPS System - Feeder B
1
F
220
VDC
17.71
339 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
F
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
TYPICAL LIGHTING & SMALL POWER CABLES TYPICAL OUTDOOR LIGHTINGS
1
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Lighting DB (Outdoor) #1
(NOTE-6)
400W Normal HPS Floodlight
3
F
400
VAC
25.60
2
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
230V AC UPS DB
(NOTE-6)
400W Emergency HPS Floodlight
3
F
400
VAC
0.40
3
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Lighting DB (Outdoor) #1
(NOTE-6)
150W Normal HPS Wellglass
3
F
400
VAC
0.15
4
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Lighting DB (Outdoor) #1
(NOTE-6)
250W HPS Streetlight
3
F
400
VAC
0.25
TYPICAL INDOOR LIGHTING 5
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Lighting (Indoor Substation-1) #1
(NOTE-6)
2x36 W Normal Fluorescent Light
1
F
230
VAC
0.07
6
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
230V AC UPS DB
(NOTE-6)
2x36 W Emergency Fluorescent Light
1
F
230
VAC
0.07
340 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
OUTER PERIMETER LIGHTING (For One (1) Loop Perimeter Lighting Cable) 7
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outer Perimeter Lighting DB
(NOTE-6)
150W Normal HPS Floodlight (16 ea)
1
F
400
VAC
2.40
8
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outer Perimeter Lighting DB
(NOTE-6)
150W Normal HPS Floodlight (14 ea)
1
F
393
VAC
2.10
9
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outer Perimeter Lighting DB
(NOTE-6)
150W Normal HPS Floodlight (12 ea)
1
F
392
VAC
1.80
10
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outer Perimeter Lighting DB
(NOTE-6)
150W Normal HPS Floodlight (10 ea)
1
F
391
VAC
1.50
11
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outer Perimeter Lighting DB
(NOTE-6)
150W Normal HPS Floodlight (8 ea)
1
F
390
VAC
1.20
12
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outer Perimeter Lighting DB
(NOTE-6)
150W Normal HPS Floodlight (6 ea)
1
F
387
VAC
0.90
13
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outer Perimeter Lighting DB
(NOTE-6)
150W Normal HPS Floodlight (4 ea)
1
F
385
VAC
0.60
14
HOLD (NOTE-5, NOTE-6)
(NOTE-6)
Outer Perimeter Lighting DB
(NOTE-6)
150W Normal HPS Floodlight (2 ea)
1
F
383
VAC
0.30
341 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
G
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
TIE-IN BANYU URIP
1
P-620-LPN-0001
HOLD (NOTE-5)
Distribution Board Helipad
HOLD (NOTE-5)
Distribution Board Guard House
3
F
400
VAC
4.40
2
HOLD (NOTE-5)
HOLD (NOTE-5)
Distribution Board Guard House
HOLD (NOTE-5)
Indoor Lighting Fluoroscent 2x36 W
1
F
230
VAC
0.07
3
HOLD (NOTE-5)
HOLD (NOTE-5)
Distribution Board Guard House
HOLD (NOTE-5)
Air Conditioning
1
F
230
VAC
1.50
4
HOLD (NOTE-5)
HOLD (NOTE-5)
Distribution Board Guard House
HOLD (NOTE-5)
Outdoor Lighting Floodlight 2x400 W
1
F
230
VAC
1.60
5
HOLD (NOTE-5)
HOLD (NOTE-5)
Distribution Board Guard House
HOLD (NOTE-5)
Socket Outlet
1
F
230
VAC
1.20
342 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From
Power
To
Equipment Tag No.
Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
6
HOLD (NOTE-5)
HOLD (NOTE-5)
UPS Distribution Board PB-24 of Banyu Urip
HOLD (NOTE-5)
SCADA-RTU Panel in PB-24
1
F
230
VAC
5.00
7
HOLD (NOTE-5)
UPDP826551
UPS 230V AC Distribution Board A/B
HOLD (NOTE-5)
CWS Workstation
1
F
230
VAC
0.657
8
HOLD (NOTE-5)
UPDP826551
UPS 230V AC Distribution Board A/B
HOLD (NOTE-5)
PCS System
1
F
230
VAC
0.95
9
HOLD (NOTE-5)
UPDP826551
UPS 230V AC Distribution Board A/B
HOLD (NOTE-5)
Flow Comp System
1
F
230
VAC
0.51
Notes : 1. Short Circuit Values (kA) in Column AI are based on ETAP simulated short circuit at each of load end (user) 2. CSA of cable (Smin) are based on the following : 343 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
ISC x √t
a.) For MV Feeder, Smin of cable determined by formulas : Smin =
k
b.) For 6600 V Motor, Smin determined by Let-through Energy of Protection Device as per Appendix-E c.) For 400 V Motor, Smin determined by Let-through Energy of Protection Device as per Appendix-F d.) For 400 V Feeder, Smin determined by Let-through Energy of Protection Device as per Appendix-G e.) For 230V Cable, Smin determined by Let-through Energy of Protection Device as per Appendix-H (Merlin Gerin C60N for Feeder and C60H for Motor) 3. Sizing cable of switchgear is based on maximum load of switchgear plus 15% contingency and 20% growth allowance of load 4. This is only general calculation of Cable for Space Heater (for motor rated > 5.5 kW). For the complete list of Space Heater cable can be seen in the Doc. No. JTB-SF-E-LST-900-00013~00018, Electrical Cable 5. The Cable Tag Number shall be verifired in the detail engineering phase. 6. The calculation of typical lighting & small power cable in this document are used as an general sizing only. The total number of lighting fixtures will sum in the Electrical MTO.
Legends:
344 of 522
GAS DEVELOPMEN
Cable Route No.
Voltage No. Equip System, Phase Type Vin
Cable Tag.No. From Equipment Tag No.
Vin (Voltage Source) Vd% (Voltage dropn in %) Vd max %(Voltage drop max in %)
IFL (Full Load current (Amp)) R (Cable resistance (ohm/1000 meter at 90 ºC)) X (Cable reactance (ohm/1000 meter at 50 Hz))
Power
To Description
Equipment Tag No.
Description
3 Ph / 1 Ph
F/M
Volt
kW
Cos (Load steady state power factor )
Sin φ
Cos β (Load starting power factor)
Lmax (Maximum Cable Length (m))
L (Cable Length (m))
Ist (Motor Starting Current (Amp))
345 of 522
=Sqrt (1-Cos² φ))
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
11 kV Switchgear ation-1 (Power Generation)
3
F
11,000
11 kV Switchgear ation-1 (Power Generation)
3
F
11 kV Switchgear ation-1 (Power Generation)
3
/ 6.6 kV Transformer A ation-1 (Power Generation)
/ 6.6 kV Transformer B ation-1 (Power Generation)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
6,500
7,471
1.00
0.87
0.49
N/A
392.14
N/A
0
14
2
3/C -
185
mm²
0.1281
0.095
748
0.56
418.8
11,000
VAC
6,500
7,471
1.00
0.87
0.49
N/A
392.14
N/A
0
14
2
3/C -
185
mm²
0.1281
0.095
748
0.56
418.8
F
11,000
VAC
3,000
3,448
1.00
0.87
0.49
N/A
180.99
N/A
5
13
1
3/C -
150
mm²
0.16
0.098
332
0.56
185.9
3
F
11,000
VAC
11,520
14,400
1.00
0.80
0.60
N/A
755.80
N/A
0
16
3
3/C -
300
mm²
0.0799
0.089
1446
0.56
809.7
3
F
11,000
VAC
11,520
14,400
1.00
0.80
0.60
N/A
755.80
N/A
0
16
3
3/C -
300
mm²
0.0799
0.089
1446
0.56
809.7
11 kV Switchgear Infrastructure
3
F
11,000
VAC
2,223
2,779
1.00
0.80
0.60
N/A
145.86
N/A
4
11
1
3/C -
95
mm²
0.247
0.105
263
0.56
147.2
1 / 0.42 kV Transformer Infrastructure
3
F
11,000
VAC
2,400
3,000
1.00
0.80
0.60
N/A
157.46
N/A
4
12
1
3/C -
120
mm²
0.197
0.102
298
0.56
166.8
346 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
11 kV Switchgear ntral Well Pad Substation
3
F
11,000
0.42 kV Central Wellpad Transformer
3
F
11 kV Switchgear ast Well Pad Substation
3
11 kV Switchgear ast Well Pad Substation / 0.42 kV East Wellpad Transformer
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
389
486
1.00
0.80
0.60
N/A
25.53
N/A
3
10
1
3/C -
70
mm²
0.343
0.111
220
0.56
123.2
11,000
VAC
384
480
1.00
0.80
0.60
N/A
25.19
N/A
1
8
1
3/C -
35
mm²
0.669
0.123
154
0.56
86.24
F
11,000
VAC
384
480
1.00
0.80
0.60
N/A
25.19
N/A
3
10
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
3
F
11,000
VAC
389
486
1.00
0.80
0.60
N/A
25.53
N/A
3
10
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
3
F
11,000
VAC
384
480
1.00
0.80
0.60
N/A
25.19
N/A
1
8
1
3/C -
35
mm²
0.669
0.115
154
0.56
86.24
11 kV Switchgear s Gas Metering Substation
3
F
11,000
VAC
166
207
1.00
0.80
0.60
N/A
12.60
N/A
0
7
1
3/C -
25
mm²
0.927
0.13
129
0.56
72.24
1 / 0.42 kV Transformer Sales Gas Metering
3
F
11,000
VAC
120
150
1.00
0.80
0.60
N/A
12.60
N/A
0
7
1
3/C -
25
mm²
0.927
0.13
129
0.56
72.24
347 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
0.4 kV Main Transformer
3
F
6,600
0.4 kV Main Transformer
3
F
4 kV Essential Transformer
3
4 kV Essential Transformer
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1,200
1,500
1.00
0.80
0.60
N/A
131.22
N/A
4
11
1
3/C -
95
mm²
0.247
0.099
263
0.56
147.2
6,600
VAC
1,200
1,500
1.00
0.80
0.60
N/A
131.22
N/A
4
11
1
3/C -
95
mm²
0.247
0.099
263
0.56
147.2
F
6,600
VAC
1,536
1,920
1.00
0.80
0.60
N/A
167.96
N/A
5
13
1
3/C -
150
mm²
0.16
0.093
332
0.56
185.9
3
F
6,600
VAC
1,536
1,920
1.00
0.80
0.60
N/A
167.96
N/A
5
13
1
3/C -
150
mm²
0.16
0.093
332
0.56
185.9
V Switchgear / MCC MV 1A Substation-2 (Train-A)
3
F
6,600
VAC
4,840
6,050
1.00
0.80
0.60
N/A
529.20
N/A
0
16
2
3/C -
300
mm²
0.0799
0.084
964
0.56
539.8
V Switchgear / MCC MV 1B Substation-2 (Train-A)
3
F
6,600
VAC
4,840
6,050
1.00
0.80
0.60
N/A
529.20
N/A
0
16
2
3/C -
300
mm²
0.0799
0.084
964
0.56
539.8
/0.4 kV Transformer 1A Substation-2 (Train-A)
3
F
6,600
VAC
960
1,200
1.00
0.80
0.60
N/A
104.97
N/A
3
10
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
/0.4 kV Transformer 1B Substation-2 (Train-A)
3
F
6,600
VAC
960
1,200
1.00
0.80
0.60
N/A
104.97
N/A
3
10
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
348 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
/0.4 kV Transformer 2A Substation-2 (Train-A)
3
F
6,600
/0.4 kV Transformer 2B Substation-2 (Train-A)
3
F
6 kV Switchgear/MCC Substation-3 (Train-B)
3
6 kV Switchgear/MCC Substation-3 (Train-B)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3,840
4,800
1.00
0.80
0.60
N/A
419.89
N/A
1
15
2
3/C -
240
mm²
0.0984
0.087
862
0.56
482.7
6,600
VAC
3,840
4,800
1.00
0.80
0.60
N/A
419.89
N/A
1
15
2
3/C -
240
mm²
0.0984
0.087
862
0.56
482.7
F
6,600
VAC
3,842
4,802
1.00
0.80
0.60
N/A
420.10
N/A
1
15
2
3/C -
240
mm²
0.0984
0.087
862
0.56
482.7
3
F
6,600
VAC
3,842
4,802
1.00
0.80
0.60
N/A
420.10
N/A
1
15
2
3/C -
240
mm²
0.0984
0.087
862
0.56
482.7
kV Transformer A Substation3 (Train-B)
3
F
6,600
VAC
3,456
4,320
1.00
0.80
0.60
N/A
377.90
N/A
0
14
2
3/C -
185
mm²
0.1281
0.09
748
0.56
418.8
kV Transformer B Substation3 (Train-B)
3
F
6,600
VAC
3,456
4,320
1.00
0.80
0.60
N/A
377.90
N/A
0
14
2
3/C -
185
mm²
0.1281
0.09
748
0.56
418.8
V Switchgear / MCC MV 2A Substation-4 (Utility)
3
F
6,600
VAC
1,798
2,248
1.00
0.80
0.60
N/A
196.62
N/A
5
14
1
3/C -
185
mm²
0.1281
0.09
374
0.56
209.4
349 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
3
F
6,600
kV Transformer Substation-4 (Utility)
3
F
kV Transformer Substation-4 (Utility)
3
mpressor (3rd Stage) MotorA
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1,798
2,248
1.00
0.80
0.60
N/A
196.62
N/A
5
14
1
3/C -
185
mm²
0.1281
0.09
374
0.56
209.4
6,600
VAC
768
960
1.00
0.80
0.60
N/A
83.98
N/A
3
10
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
F
6,600
VAC
768
960
1.00
0.80
0.60
N/A
83.98
N/A
3
10
1
3/C -
70
mm²
0.343
0.104
220
0.56
123.2
3
M
6,600
VAC
300.00
340.91
0.952
0.88
0.47
0.50
31.33
203.62
0
0
1
3/C -
#N/A mm²
#N/A
#N/A
#N/A
0.56
#N/A
mpressor (3rd Stage) MotorB
3
M
6,600
VAC
300.00
340.91
0.952
0.88
0.47
0.50
31.33
203.62
0
0
1
3/C -
#N/A mm²
#N/A
#N/A
#N/A
0.56
mpressor (4th Stage) MotorA
3
M
6,600
VAC
750.00
842.70
0.965
0.89
0.46
0.50
76.39
496.54
0
0
1
3/C -
#N/A mm²
#N/A
#N/A
#N/A
0.56
mpressor (4th Stage) MotorB
3
M
6,600
VAC
750.00
842.70
0.965
0.89
0.46
0.50
76.39
496.54
0
0
1
3/C -
#N/A mm²
#N/A
#N/A
#N/A
0.56
V Switchgear / MCC MV 2B Substation-4 (Utility)
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
350 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
n Amine Pump-A (Train A)
3
M
6,600
n Amine Pump-B (Train A)
3
M
n Amine Pump-A (Train B)
3
n Amine Pump-B (Train B)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
200.00
229.89
0.947
0.87
0.49
0.50
21.24
138.03
0
7
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.24
6,600
VAC
200.00
229.89
0.947
0.87
0.49
0.50
21.24
138.03
0
7
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.24
M
6,600
VAC
200.00
229.89
0.947
0.87
0.49
0.50
21.24
138.03
0
7
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.24
3
M
6,600
VAC
200.00
229.89
0.947
0.87
0.49
0.50
21.24
138.03
0
7
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.24
P BWF Start-Up Pump
3
M
6,600
VAC
300.00
340.91
0.952
0.88
0.47
0.50
31.33
203.62
0
7
1
3/C -
25
mm²
0.927
0.13
129
0.56
72.24
ent Air Compressor Package Motor A
3
M
6,600
VAC
355.00
403.41
0.957
0.88
0.47
0.50
36.87
239.69
0
7
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.24
351 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ent Air Compressor Package Motor B
3
M
6,600
ent Air Compressor Package Motor C
3
M
ewater Pump - Electric
3
Inlet Cooler Fan 1
Inlet Cooler Fan 2
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
355.00
403.41
0.957
0.88
0.47
0.50
36.87
239.69
0
7
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.24
6,600
VAC
355.00
403.41
0.957
0.88
0.47
0.50
36.87
239.69
0
7
1
3/C -
25
mm²
0.927
0.122
129
0.56
72.24
M
6,600
VAC
300.00
340.91
0.952
0.88
0.47
0.50
31.33
203.62
2
9
1
3/C -
50
mm²
0.494
0.11
181
0.56
101.3
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
352 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Inlet Cooler Fan 3
3
M
400
Inlet Cooler Fan 4
3
M
Inlet Cooler Fan 5
3
Inlet Cooler Fan 6
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Inlet Cooler Fan 7
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Inlet Cooler Fan 8
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
ced Water Transfer Pump A
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
ced Water Transfer Pump B
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
353 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
e Produced Water Transfer Pump A
3
M
400
e Produced Water Transfer Pump B
3
M
3
Condensate Transfer Pump A
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
5
13
1
3/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
5
13
1
3/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
Condensate Transfer Pump B
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
ompressor (1st Stage) MotorA
3
M
0
VAC
132.00
150.00
0.954
0.88
0.47
0.50
#DIV/0!
#DIV/0!
0
###
2
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
ompressor (1st Stage) MotorB
3
M
0
VAC
132.00
150.00
0.954
0.88
0.47
0.50
#DIV/0!
#DIV/0!
0
###
2
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
Skim Oil Pump
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
354 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ercooler-A (1st Stage) Fan-1
3
M
400
ercooler-A (1st Stage) Fan-2
3
M
ercooler-B (1st Stage) Fan-1
3
ercooler-B (1st Stage) Fan-2
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
mpressor (2nd Stage) MotorA
3
M
0
VAC
75.00
85.23
0.948
0.88
0.47
0.50
#DIV/0!
#DIV/0!
0
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
mpressor (2nd Stage) MotorB
3
M
0
VAC
75.00
85.23
0.948
0.88
0.47
0.50
#DIV/0!
#DIV/0!
0
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
ercooler-A (2nd Stage) Fan-1
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
0
2
1
3/C -
9.4500
0.60
ercooler-A (2nd Stage) Fan-2
3
M
0
VAC
1.10
1.29
0.802
0.85
0.53
0.50
#DIV/0!
#DIV/0!
1
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
ercooler-B (2nd Stage) Fan-1
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
0
2
1
3/C -
9.4500
0.60
355 of 522
2.5
2.5
mm²
mm²
0.0961
0.0961
29
29
Amp
17.40
#DIV/
17.40
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ercooler-B (2nd Stage) Fan-2
3
M
0
ercooler-A (3rd Stage) Fan-1
3
M
ercooler-A (3rd Stage) Fan-2
3
ercooler-B (3rd Stage) Fan-1
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.10
1.29
0.802
0.85
0.53
0.50
#DIV/0!
#DIV/0!
1
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
5.8800
0.60
M
0
VAC
2.20
2.62
0.842
0.84
0.54
0.50
#DIV/0!
#DIV/0!
1
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
5.8800
0.60
ercooler-B (3rd Stage) Fan-2
3
M
0
VAC
2.20
2.62
0.842
0.84
0.54
0.50
#DIV/0!
#DIV/0!
1
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
RU Knockout Pump A
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
RU Knockout Pump B
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Motor for VRU Compressor
3
M
400
VAC
160.00
179.78
0.961
0.89
0.46
0.50
270.01
1755.09
0
12
2
3/C -
120
mm²
0.1970
0.0708
480
0.60
288.0
356 of 522
4
4
mm²
mm²
0.0899
0.0899
37
37
Amp
#DIV/
22.20
#DIV/
22.20
#DIV/
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ethanol Injection Pump
3
M
400
ndensate Reflux Pump A
3
M
ndensate Reflux Pump B
3
ndensate Cooler Fan-1
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.00
3.49
0.851
0.86
0.51
0.50
5.92
38.46
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
ndensate Cooler Fan-2
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
sate Stabilizer Recycle Liquid Pump
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
le Gas Compressor Cooler Fan-1
3
M
400
VAC
3.00
3.49
0.851
0.86
0.51
0.50
5.92
38.46
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
le Gas Compressor Cooler Fan-2
3
M
400
VAC
3.00
3.49
0.851
0.86
0.51
0.50
5.92
38.46
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
357 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
EG Circulator Pump A
3
M
400
EG Circulator Pump B
3
M
EG Reflux Pump A
3
EG Reflux Pump B
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ced Water Booster Pump A
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ced Water Booster Pump B
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
3
M
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
7
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
EG Makeup Pump
egeneration Overhead Gas Compressor A
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
358 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
egeneration Overhead Gas Compressor B
3
M
400
eneration Tower Cooler Fan-1
3
M
eneration Tower Cooler Fan-2
3
ycol Drain Return Pump
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
pylene Condenser Fan 1
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
pylene Condenser Fan 2
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
pylene Condenser Fan 3
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
pylene Condenser Fan 4
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
359 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
pylene Condenser Fan 5
3
M
400
pylene Condenser Fan 6
3
M
pylene Condenser Fan 7
3
pylene Condenser Fan 8
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
ne Compressor A (1st Stage) Auxiliary Load
3
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
ne Compressor A (2nd Stage) Auxiliary Load
3
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
ne Compressor B (1st Stage) Auxiliary Load
3
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
ne Compressor B (2nd Stage) Auxiliary Load
3
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
360 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
olvent Air Cooler-A (AGRU A) #1
3
M
400
olvent Air Cooler-A (AGRU A) #2
3
M
olvent Air Cooler-A (AGRU A) #3
3
olvent Air Cooler-A (AGRU A) #4
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
olvent Air Cooler-A (AGRU A) #5
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
olvent Air Cooler-A (AGRU A) #6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
olvent Air Cooler-A (AGRU A) #7
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
olvent Air Cooler-A (AGRU A) #8
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
olvent Air Cooler-B (AGRU A) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
361 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
olvent Air Cooler-B (AGRU A) #2
3
M
400
olvent Air Cooler-B (AGRU A) #3
3
M
olvent Air Cooler-B (AGRU A) #4
3
olvent Air Cooler-B (AGRU A) #5
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
olvent Air Cooler-B (AGRU A) #6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
olvent Air Cooler-B (AGRU A) #7
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
olvent Air Cooler-B (AGRU A) #8
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
6
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
for HP Lean Solvent Pump 1 (Train A)
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
6
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
for HP Lean Solvent Pump 2 (Train A)
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
6
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
362 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
for HP Lean Solvent Pump 3 (Train A)
3
M
400
flux Pump-1 A (Train A)
3
M
flux Pump-1 B (Train A)
3
flux Pump-2 A (Train A)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
6
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
flux Pump-2 B (Train A)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
d Solvent Pump (Stand-By) Train A
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Hydrocarbon Pump (StandBy) Train A
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
for LP Lean Solvent Pump 1 (Train A)
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
for LP Lean Solvent Pump 2 (Train A)
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
363 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
3
M
400
iary for Regenerator Lean olvent Pump 1 (Train A)
3
M
iary for Regenerator Lean olvent Pump 2 (Train A)
3
iary for Regenerator Lean olvent Pump 3 (Train A)
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
Condensate Pump-1A (Train A)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
Condensate Pump-1B (Train A)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
Condensate Pump-2A (Train A)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
Condensate Pump-2B (Train A)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
ad Condenser-A (AGRU A) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
for LP Lean Solvent Pump 3 (Train A)
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
364 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ad Condenser-A (AGRU A) #2
3
M
400
ad Condenser-A (AGRU A) #3
3
M
ad Condenser-A (AGRU A) #4
3
ad Condenser-B (AGRU A) #1
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
ad Condenser-B (AGRU A) #2
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
ad Condenser-B (AGRU A) #3
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
ad Condenser-B (AGRU A) #4
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
RU Fresh Solvent Pump A
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
RU Fresh Solvent Pump B
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
365 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
olvent Air Cooler-A (AGRU B) #1
3
M
400
olvent Air Cooler-A (AGRU B) #2
3
M
olvent Air Cooler-A (AGRU B) #3
3
olvent Air Cooler-A (AGRU B) #4
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
olvent Air Cooler-A (AGRU B) #5
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
olvent Air Cooler-A (AGRU B) #6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
olvent Air Cooler-A (AGRU B) #7
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
olvent Air Cooler-A (AGRU B) #8
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
366 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
olvent Air Cooler-B (AGRU B) #1
3
M
400
olvent Air Cooler-B (AGRU B) #2
3
M
olvent Air Cooler-B (AGRU B) #3
3
olvent Air Cooler-B (AGRU B) #4
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
olvent Air Cooler-B (AGRU B) #5
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
olvent Air Cooler-B (AGRU B) #6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
olvent Air Cooler-B (AGRU B) #7
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
olvent Air Cooler-B (AGRU B) #8
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
for HP Lean Solvent Pump 1 (Train B)
3
M
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
5
8
1
3/C -
35
mm²
0.6690
0.0753
122
0.60
73.20
367 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
for HP Lean Solvent Pump 2 (Train B)
3
M
400
for HP Lean Solvent Pump 3 (Train B)
3
M
flux Pump-1 A (Train B)
3
flux Pump-1 B (Train B)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
5
8
1
3/C -
35
mm²
0.6690
0.0753
122
0.60
73.20
400
VAC
22.00
24.72
0.928
0.89
0.46
0.50
38.45
249.91
5
8
1
3/C -
35
mm²
0.6690
0.0753
122
0.60
73.20
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
flux Pump-2 A (Train B)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
flux Pump-2 B (Train B)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
d Solvent Pump (Stand-By) Train B
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Hydrocarbon Pump (StandBy) Train B
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
for LP Lean Solvent Pump 1 (Train B)
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
368 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
for LP Lean Solvent Pump 2 (Train B)
3
M
400
for LP Lean Solvent Pump 3 (Train B)
3
M
iary for Regenerator Lean olvent Pump 1 (Train B)
3
iary for Regenerator Lean olvent Pump 2 (Train B)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
iary for Regenerator Lean olvent Pump 3 (Train B)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
iler Condensate Pump-1 A (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
ler Condensate Pump-1 B (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
iler Condensate Pump-2 A (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
ler Condensate Pump-2 B (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
369 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ad Condenser-A (AGRU B) #1
3
M
400
ad Condenser-A (AGRU B) #2
3
M
ad Condenser-A (AGRU B) #3
3
ad Condenser-A (AGRU B) #4
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
ad Condenser-B (AGRU B) #1
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
ad Condenser-B (AGRU B) #2
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
ad Condenser-B (AGRU B) #3
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
ad Condenser-B (AGRU B) #4
3
M
400
VAC
55.00
61.80
0.944
0.89
0.46
0.50
94.49
614.18
5
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
370 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Gas Dehy TEG Circulation Pump A
3
M
400
Gas Dehy TEG Circulation Pump B
3
M
Gas Dehy TEG Lean Cooler Fan-1
3
Gas Dehy TEG Lean Cooler Fan-2
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
132.00
150.00
0.954
0.88
0.47
0.50
226.95
1475.15
5
16
1
3/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
400
VAC
132.00
150.00
0.954
0.88
0.47
0.50
226.95
1475.15
5
16
1
3/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
Gas Dehy TEG Lean Cooler Fan-3
3
M
0
VAC
15.00
16.67
0.913
0.90
0.44
0.50
#DIV/0!
#DIV/0!
4
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
Gas Dehy TEG Lean Cooler Fan-4
3
M
0
VAC
15.00
16.67
0.913
0.90
0.44
0.50
#DIV/0!
#DIV/0!
4
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
Gas Dehy TEG Supply Pump
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
EG Drain Vessel Pump
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
371 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Gas Compressor Discharge Cooler Fan 1
3
M
400
Gas Compressor Discharge Cooler Fan 2
3
M
Gas Compressor Discharge Cooler Fan 3
3
Gas Compressor Discharge Cooler Fan 4
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
M
0
VAC
30.00
34.09
0.932
0.88
0.47
0.50
#DIV/0!
#DIV/0!
3
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
3
M
0
VAC
30.00
34.09
0.932
0.88
0.47
0.50
#DIV/0!
#DIV/0!
3
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
Gas Compressor A Auxiliary Load
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
4
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
Gas Compressor B Auxiliary Load
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
4
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
sh Water Pump-1 at AGE Absorber (Train A)
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
sh Water Pump-2 at AGE Absorber (Train A)
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
372 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
sh Water Pump-3 at AGE Absorber (Train A)
3
M
400
rator Reflux Pump-1 (Train A)
3
M
rator Reflux Pump-2 (Train A)
3
rator Reflux Pump-3 (Train A)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
Solvent Sump Pump-A (Train A)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
Solvent Sump Pump-B (Train A)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
rator Overhead Condenser 1 (Train A)
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
4
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
rator Overhead Condenser 2 (Train A)
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
4
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
rator Bottoms Pump 1 (Train A)
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
4
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
373 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
rator Bottoms Pump 2 (Train A)
3
M
400
rator Bottoms Pump 3 (Train A)
3
M
n Amine Cooler (Train A) #1
3
n Amine Cooler (Train A) #2
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
4
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
4
12
1
3/C -
120
mm²
0.1970
0.0708
240
0.60
144.0
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
n Amine Cooler (Train A) #3
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
n Amine Cooler (Train A) #4
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
n Amine Cooler (Train A) #5
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
n Amine Cooler (Train A) #6
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
n Amine Cooler (Train A) #7
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
374 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
n Amine Cooler (Train A) #8
3
M
400
ine Pump-1 at AGE Absorber (Train A)
3
M
ine Pump-2 at AGE Absorber (Train A)
3
ine Pump-3 at AGE Absorber (Train A)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
5
15
1
3/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
5
15
1
3/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
5
15
1
3/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
h Solvent Pump A (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
Solvent Pump B (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
r Water Pump-1 (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
r Water Pump-2 (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
r Water Pump-3 (Train A)
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
375 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
sh Water Pump-1 at AGE Absorber (Train B)
3
M
400
sh Water Pump-2 at AGE Absorber (Train B)
3
M
sh Water Pump-3 at AGE Absorber (Train B)
3
generator Reflux Pump-1 (Train B)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
generator Reflux Pump-2 (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
generator Reflux Pump-3 (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
nt Sump Pump-A (Train B)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
nt Sump Pump-B (Train B)
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
376 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
rator Overhead Condenser 1 (Train B)
3
M
400
rator Overhead Condenser 2 (Train B)
3
M
rator Bottoms Pump-1 (Train B)
3
rator Bottoms Pump-2 (Train B)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
rator Bottoms Pump-3 (Train B)
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
n Amine Cooler (Train B) #1
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
n Amine Cooler (Train B) #2
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
n Amine Cooler (Train B) #3
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
n Amine Cooler (Train B) #4
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
377 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
n Amine Cooler (Train B) #5
3
M
400
n Amine Cooler (Train B) #6
3
M
n Amine Cooler (Train B) #7
3
n Amine Cooler (Train B) #8
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
ine Pump-A at AGE Absorber (Train B)
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
2
12
2
3/C -
120
mm²
0.1970
0.0708
480
0.60
288.0
ine Pump-B at AGE Absorber (Train B)
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
2
12
2
3/C -
120
mm²
0.1970
0.0708
480
0.60
288.0
ine Pump-C at AGE Absorber (Train B)
3
M
400
VAC
110.00
127.91
0.951
0.86
0.51
0.50
194.13
1261.85
2
12
2
3/C -
120
mm²
0.1970
0.0708
480
0.60
288.0
r Water Pump-A (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
r Water Pump-B (Train B)
3
M
400
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
378 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
3
M
400
ulfur Transfer Pump A
3
M
ulfur Transfer Pump B
3
Air Blower A Auxiliary Load
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
15.00
16.67
0.913
0.90
0.44
0.50
26.35
171.27
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Air Blower B Auxiliary Load
3
M
400
VAC
7.50
8.43
0.899
0.89
0.46
0.50
13.53
87.94
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
ur Condensate Pump A
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
ur Condensate Pump B
3
M
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
ulfur Handling Pump A
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
Water Pump-C (Train B)
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
379 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ulfur Handling Pump B
3
M
400
P Condensate Pump A
3
M
P Condensate Pump B
3
Quench Water Pump-A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
Quench Water Pump-B
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
sh Water Pump-A at TGU Absorber
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
h Water Pump-B at TGU Absorber
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
5
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
ine Pump-A at TGU Absorber
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
380 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ine Pump-B at TGU Absorber
3
M
400
Water Drain Return Pump
3
M
ench Water Air Cooler #1
3
ench Water Air Cooler #2
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
6
14
1
3/C -
185
mm²
0.1281
0.0720
304
0.60
182.4
400
VAC
2.20
2.62
0.842
0.84
0.54
0.50
4.49
29.18
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
5
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
5
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
BFW Transfer Pump-A
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
3
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
BFW Transfer Pump-B
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
3
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
am Condensate Pump A
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
am Condensate Pump B
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
381 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Blowdown Pump A
3
M
400
Blowdown Pump B
3
M
LP BFW Pump A
3
LP BFW Pump B
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
4
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
3
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
4
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
eam Condenser Fan-1
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
eam Condenser Fan-2
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
eam Condenser Fan-3
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.56
44.24
eam Condenser Fan-4
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.56
44.24
eam Condenser Fan-5
3
M
0
VAC
0.00
0.00
0.948
0.88
0.47
0.50
#DIV/0!
#DIV/0!
4
###
1
3/C - #DIV/0! mm²
382 of 522
#DIV/0! #DIV/0! #DIV/0!
0.56
Amp
#DIV/
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
eam Condenser Fan-6
3
M
0
eam Condenser Fan-7
3
M
eam Condenser Fan-8
3
eam Condenser Fan-9
eam Condenser Fan-10
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.00
0.00
0.948
0.88
0.47
0.50
#DIV/0!
#DIV/0!
4
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
0
VAC
0.00
0.00
0.948
0.88
0.47
0.50
#DIV/0!
#DIV/0!
4
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
M
0
VAC
0.00
0.00
0.948
0.88
0.47
0.50
#DIV/0!
#DIV/0!
4
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
3
M
0
VAC
0.00
0.00
0.948
0.88
0.47
0.50
#DIV/0!
#DIV/0!
4
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
3
M
0
VAC
0.00
0.00
0.948
0.88
0.47
0.50
#DIV/0!
#DIV/0!
4
###
1
3/C - #DIV/0! mm²
#DIV/0! #DIV/0! #DIV/0!
0.56
#DIV/
Scavenger Tank Mixer Motor
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
alization Amine Tank Mixer Motor
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ate Solution Tank Mixer Motor
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
n Scavenger Pump Motor-A
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
383 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
n Scavenger Pump Motor-B
3
M
400
zation Amine Pump Motor-A
3
M
zation Amine Pump Motor-B
3
hate Solution Pump Motor A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
400
VAC
1.10
1.29
0.802
0.85
0.53
0.50
2.33
15.14
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
M
400
VAC
1.10
1.29
0.802
0.85
0.53
0.50
2.33
15.14
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
hate Solution Pump Motor B
3
M
400
VAC
0.75
0.87
0.772
0.86
0.51
0.50
1.63
10.60
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
or Steam Condenser Motor 1
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
3
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
or Steam Condenser Motor 2
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
3
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
aw Water Feed Pump A
3
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
4
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
384 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
aw Water Feed Pump B
3
M
400
Off-Gas K.O. Drum Pump-A
3
M
Off-Gas K.O. Drum Pump-B
3
Off-Gas K.O. Drum Pump-A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
4
9
1
3/C -
50
mm²
0.4940
0.0748
144
0.60
86.40
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Off-Gas K.O. Drum Pump-B
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
mal Oxidizer Air Blower A Auxiliary Load
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
mal Oxidizer Air Blower B Auxiliary Load
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
mal Oxidizer Air Blower C Auxiliary Load
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
385 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
mal Oxidizer Air Blower D Auxiliary Load
3
M
400
mal Oxidizer Air Blower E Auxiliary Load
3
M
Knockout Drum Condensate Pump A
3
Knockout Drum Condensate Pump B
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
M
400
VAC
90.00
100.00
0.951
0.90
0.44
0.50
151.77
986.53
2
11
2
3/C -
95
mm²
0.2470
0.0711
422
0.60
253.2
3
M
400
VAC
90.00
100.00
0.951
0.90
0.44
0.50
151.77
986.53
2
11
2
3/C -
95
mm²
0.2470
0.0711
422
0.60
253.2
Knockout Drum Condensate Pump A
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
8
16
1
3/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
Knockout Drum Condensate Pump B
3
M
400
VAC
75.00
85.23
0.948
0.88
0.47
0.50
129.76
843.46
8
16
1
3/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
386 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Diesel Pump
3
M
400
3
M
Close Drain Pump
3
Open Drain Pump
irewater Jockey Pump
gency LV Switchgear/MCC ation-1 (Power Generation) Charger Emergency Diesel Generator
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
M
400
VAC
37.00
41.57
0.936
0.89
0.46
0.50
64.11
416.70
6
11
1
3/C -
95
mm²
0.2470
0.0711
211
0.60
126.6
3
M
400
VAC
5.50
6.25
0.886
0.88
0.47
0.50
10.18
66.18
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
3
F
400
VAC
320
400.00
1.00
0.80
0.60
N/A
577.35
N/A
0
16
3
4/C -
300
mm²
0.0799
0.0835
1188
0.60
712.8
3
F
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
387 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
0 VAC Switchgear/MCC Well Pad Central
3
F
400
ry Charger Backup Diesel nerator Well Pad Central
3
F
0 VAC Switchgear/MCC Well Pad Central
3
0 VAC Switchgear/MCC Well Pad East
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
240.00
300.00
1.00
0.80
0.60
N/A
433.01
N/A
0
16
2
4/C -
300
mm²
0.0799
0.0835
792
0.60
475.2
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
F
400
VAC
160
200
1.00
0.80
0.60
N/A
288.68
N/A
3
13
2
4/C -
150
mm²
0.16
0.0843
542
0.60
325.2
3
F
400
VAC
240.00
300.00
1.00
0.80
0.60
N/A
433.01
N/A
0
16
3
4/C -
300
mm²
0.0799
0.0835
1188
0.60
712.8
ry Charger Backup Diesel enerator Well Pad East
3
F
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
0 VAC Switchgear/MCC Well Pad East
3
F
400
VAC
160
200
1.00
0.80
0.60
N/A
288.68
N/A
5
15
1
4/C -
240
mm²
0.0984
0.0842
538
0.60
322.8
388 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
0 VAC Switchgear/MCC Infrastructure
3
F
400
ry Charger Backup Diesel enerator Infrastructure
3
F
0 VAC Switchgear/MCC Infrastructure
3
0 VAC Switchgear/MCC es Gas Metering Station
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
414
518
1.00
0.80
0.60
N/A
747.67
N/A
0
16
4
4/C -
300
mm²
0.0799
0.0835
1584
0.56
887.0
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
F
400
VAC
1,500
1
1.00
0.80
0.60
N/A
2706.33
N/A
-1
15
3
4/C -
240
mm²
0.0984
0.0842
1053
0.56
589.6
3
F
400
VAC
100.00
125.00
1.00
0.80
0.60
N/A
180.42
N/A
4
14
1
4/C -
185
mm²
0.1281
0.0851
304
0.60
182.4
ry Charger Backup Diesel erator Sales Gas Metering
3
F
400
VAC
2.20
2.62
0.842
0.84
0.54
N/A
4.49
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
0 VAC Switchgear/MCC es Gas Metering Station
3
F
400
VAC
100.00
200.00
1.00
0.80
0.60
N/A
180.42
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
346
0.60
207.6
A Lube Oil Clarifier Driver
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
389 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
A Lube Oil Pump Driver-A
3
M
400
A Lube Oil Pump Driver-B
3
M
Lube Oil Tank Mist SeparatorA
3
Lube Oil Tank Mist SeparatorB
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
3
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
3
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
A Jacking Oil Oump Driver
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
G-A Bearing Gear Driver
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
B Lube Oil Clarifier Driver
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
B Lube Oil Pump Driver-A
3
M
400
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
3
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
390 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
B Lube Oil Pump Driver-B
3
M
400
B Lube Oil Mist Separator-A
3
M
B Lube Oil Mist Separator-B
3
B Jacking Oil Oump Driver
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
30.00
34.09
0.932
0.88
0.47
0.50
52.80
343.17
3
7
1
3/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
3
M
400
VAC
1.50
1.76
0.816
0.85
0.53
0.50
3.12
20.29
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
G-B Bearing Gear Driver
3
M
400
VAC
4.00
4.49
0.860
0.89
0.46
0.50
7.54
49.03
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
or Fan Essential Generator
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Power Essential Generator
3
F
400
VAC
18.25
20.28
0.913
0.90
0.44
N/A
32.06
N/A
6
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
Charger Essential Generator
3
F
400
VAC
2.00
2.11
1.000
0.95
0.31
N/A
3.04
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
391 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
former Rectifier Unit (GPF nderground Pipeline)-1
3
F
400
former Rectifier Unit (GPF nderground Pipeline)-2
3
F
ansformer Rectifier Unit Gas Metering Underground Pipeline)
3
AC UPS System - Feeder A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.50
4.38
0.950
0.80
0.60
N/A
6.65
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
400
VAC
3.50
4.38
0.950
0.80
0.60
N/A
6.65
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
F
400
VAC
3.50
4.38
0.950
0.80
0.60
N/A
6.65
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
3
F
400
VAC
64.00
80.00
0.900
0.80
0.60
N/A
128.30
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
AC UPS System - Feeder B
3
F
400
VAC
64.00
80.00
0.900
0.80
0.60
N/A
128.30
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
VAC UPS System - Bypass
3
F
400
VAC
64.00
80.00
0.900
0.80
0.60
N/A
128.30
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
DC UPS System - Feeder A
3
F
400
VAC
13.78
17.23
0.900
0.80
0.60
N/A
27.62
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
392 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
DC UPS System - Feeder B
3
F
400
C Package for Substation-1
3
F
C Package for Substation-1
3
C Package for Substation-1
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
13.78
17.23
0.900
0.80
0.60
N/A
27.62
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
400
VAC
113.20
141.50
1.000
0.80
0.60
N/A
204.24
N/A
5
15
1
4/C -
240
mm²
0.0984
0.0842
351
0.60
210.6
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
C Package for Substation-1
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
C Auxiliary for Substation 1
3
F
400
VAC
32.20
40.25
1.000
0.80
0.60
N/A
58.10
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
ghting DB (Outdoor) #1
3
F
400
VAC
46.30
54.47
0.950
0.85
0.53
N/A
82.76
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
ng (Indoor Substation-1) #1
3
F
400
VAC
13.80
16.24
0.950
0.85
0.53
N/A
24.67
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
393 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
3
F
400
Welding Receptacle #1
3
F
Welding Receptacle #2
3
AC UPS System - Feeder A
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.20
8.47
0.950
0.85
0.53
N/A
12.87
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
3
F
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
AC UPS System - Feeder B
3
F
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
VAC UPS System - Bypass
3
F
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
DC UPS System - Feeder A
3
F
400
VAC
10.92
13.65
0.900
0.80
0.60
N/A
21.89
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
g (Outdoor Emergency) #1
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
394 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
DC UPS System - Feeder B
3
F
400
C package for Substation 2
3
F
C package for Substation 2
3
C package for Substation 2
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
10.92
13.65
0.900
0.80
0.60
N/A
21.89
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
400
VAC
146.70
183.38
1.000
0.80
0.60
N/A
264.68
N/A
0
12
2
4/C -
120
mm²
0.197
0.0839
480
0.60
288.0
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
3
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
C package for Substation 2
3
F
400
VAC
34.00
42.50
1.000
0.80
0.60
N/A
61.34
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
C Auxiliary for Substation 2
3
F
400
VAC
45.00
56.25
1.000
0.80
0.60
N/A
81.19
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
ghting DB (Outdoor) #2
3
F
400
VAC
93.30
109.76
1.000
0.85
0.53
N/A
158.43
N/A
4
13
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
ng (Indoor Substation-2) #2
3
F
400
VAC
11.90
14.00
1.000
0.85
0.53
N/A
20.21
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
395 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
3
F
400
Welding Receptacle #3
3
F
Welding Receptacle #4
3
Welding Receptacle #7
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
12.50
14.71
1.000
0.85
0.53
N/A
21.23
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
Welding Receptacle #8
3
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
Muster Point-1 GPF
3
F
400
VAC
2.00
2.35
0.950
0.85
0.53
N/A
3.57
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
Muster Point-2 GPF
3
F
400
VAC
2.00
2.35
0.950
0.85
0.53
N/A
3.57
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
g (Outdoor Emergency) #2
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
396 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
AC UPS System - Feeder A
3
F
400
AC UPS System - Feeder B
3
F
VAC UPS System - Bypass
3
DC UPS System - Feeder A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
F
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
3
F
400
VAC
8.06
10.08
0.900
0.80
0.60
N/A
16.16
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
DC UPS System - Feeder B
3
F
400
VAC
8.06
10.08
0.900
0.80
0.60
N/A
16.16
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
C package for Substation 3
3
F
400
VAC
224.20
280.25
1.000
0.80
0.60
N/A
404.51
N/A
-1
15
2
4/C -
240
mm²
0.0984
0.0842
702
0.60
421.2
C package for Substation 3
3
F
400
VAC
71.00
88.75
1.000
0.80
0.60
N/A
128.10
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
C package for Substation 3
3
F
400
VAC
71.00
88.75
1.000
0.80
0.60
N/A
128.10
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
397 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
C Auxiliary for Substation 3
3
F
400
g DB (Outdoor Substation-3)
3
F
ting (Indoor Substation-3)
3
ing (Outdoor Emergency)
& Small Power DB (Indoor trument Building 280A)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
83.00
103.75
1.000
0.80
0.60
N/A
149.75
N/A
4
13
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
400
VAC
58.00
68.24
0.950
0.85
0.53
N/A
103.67
N/A
4
11
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
F
400
VAC
9.80
11.53
1.000
0.85
0.53
N/A
16.64
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
3
F
400
VAC
15.00
17.65
1.000
0.85
0.53
N/A
25.47
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
3
F
400
VAC
2.10
2.47
1.000
0.85
0.53
N/A
3.57
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
elding Receptacle #5
3
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
elding Receptacle #6
3
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.4
398 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
AC UPS System - Feeder A
3
F
400
AC UPS System - Feeder B
3
F
VAC UPS System - Bypass
3
DC UPS System - Feeder A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
F
400
VAC
32.00
40.00
0.900
0.80
0.60
N/A
64.15
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
3
F
400
VAC
5.46
6.83
0.900
0.80
0.60
N/A
10.95
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
DC UPS System - Feeder B
3
F
400
VAC
5.46
6.83
0.900
0.80
0.60
N/A
10.95
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
C package for Substation 4
3
F
400
VAC
112.70
132.59
0.900
0.85
0.53
N/A
212.64
N/A
5
16
1
4/C -
300
mm²
0.0799
0.0835
396
0.60
237.6
C package for Substation 4
3
F
400
VAC
34.00
40.00
0.900
0.85
0.53
N/A
64.15
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
C package for Substation 4
3
F
400
VAC
34.00
40.00
0.900
0.85
0.53
N/A
64.15
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
399 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
C Auxiliary for Substation 4
3
F
400
g DB (Outdoor Substation-4)
3
F
g DB (Indoor Substation-4)
3
g (Outdoor Emergency) #4
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
45.00
52.94
0.900
0.85
0.53
N/A
84.90
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
400
VAC
57.35
67.47
1.000
0.85
0.53
N/A
97.39
N/A
4
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
F
400
VAC
8.00
9.41
1.000
0.85
0.53
N/A
13.58
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
3
F
400
VAC
5.60
6.59
1.000
0.85
0.53
N/A
9.51
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
C package for Instrument Building Train-A
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
C package for Instrument Building Train-A
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
C package for Instrument Building Train-A
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
400 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Aux for Instrument Building Train-A
3
F
400
C package for Instrument Building Train-B
3
F
C package for Instrument Building Train-B
3
C package for Instrument Building Train-B
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
86.00
107.50
1.000
0.80
0.60
N/A
155.16
N/A
4
13
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
27.00
33.75
1.000
0.80
0.60
N/A
48.71
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Aux for Instrument Building Train-B
3
F
400
VAC
86.00
107.50
1.000
0.80
0.60
N/A
155.16
N/A
4
13
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
trument Panel (Train-A)
3
F
400
VAC
20.00
23.53
0.900
0.85
0.53
N/A
37.74
N/A
4
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
trument Panel (Train-B)
3
F
400
VAC
20.00
23.53
0.90
0.85
0.53
N/A
37.74
N/A
4
7
1
4/C -
25
mm²
0.9270
0.0908
101
0.60
60.60
401 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
(Indoor Substation-5) Train-A DP
3
F
400
(Indoor Substation-5) Train-B DP
3
F
(Outdoor Substation-5) Train-A DP
3
ting (Emergency Outdoor ubstation-5) Train-A DP
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
7.52
8.85
0.90
0.85
0.53
N/A
14.19
N/A
3
5
1
4/C -
10
mm²
2.3400
0.0930
61
0.60
36.60
400
VAC
7.52
8.85
0.90
0.85
0.53
N/A
14.19
N/A
3
5
1
4/C -
10
mm²
2.3400
0.0930
61
0.60
36.60
F
400
VAC
75.00
88.24
0.90
0.85
0.53
N/A
141.51
N/A
4
12
1
4/C -
120
mm²
0.1970
0.0839
240
0.56
134.4
3
F
400
VAC
15.00
17.65
0.90
0.85
0.53
N/A
28.30
N/A
5
7
1
4/C -
25
mm²
0.9270
0.0908
101
0.56
56.56
( Outdoor Substation-5) Train-B DP
3
F
400
VAC
75.00
88.24
0.90
0.85
0.53
N/A
141.51
N/A
4
12
1
4/C -
120
mm²
0.1970
0.0839
240
0.56
134.4
ting (Emergency Outdoor bstation-5) Train-B DP
3
F
400
VAC
15.00
17.65
0.90
0.85
0.53
N/A
28.30
N/A
5
7
1
4/C -
25
mm²
0.9270
0.0908
101
0.56
56.56
AC UPS System - Feeder A Control Room
3
F
400
VAC
48.00
60.00
0.900
0.80
0.60
N/A
96.23
N/A
4
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
AC UPS System - Feeder B Control Room
3
F
400
VAC
48.00
60.00
0.900
0.80
0.60
N/A
96.23
N/A
4
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
402 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
3
F
400
AHU DX
3
F
AHU DX
3
itioner Cassette Type (Total = 14 unit)
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
48.00
60.00
0.900
0.80
0.60
N/A
96.23
N/A
4
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
400
VAC
11.00
12.94
0.900
0.85
0.53
N/A
20.75
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
F
400
VAC
2.20
2.59
0.900
0.85
0.53
N/A
4.15
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
3
F
400
VAC
29.35
34.53
0.900
0.85
0.53
N/A
55.38
N/A
4
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
Electric Duct Heater
3
F
400
VAC
106.03
124.74
0.900
0.85
0.53
N/A
200.05
N/A
0
10
2
4/C -
70
mm²
0.343
0.0864
356
0.60
213.6
AC Auxiliary
3
F
400
VAC
6.30
7.41
0.900
0.85
0.53
N/A
11.89
N/A
2
4
2
4/C -
6
mm²
3.93
0.098
92
0.60
55.20
3
F
400
VAC
30.20
35.53
0.950
0.85
0.53
N/A
53.98
N/A
4
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
VAC UPS System - Bypass Control Room
ng (Indoor Control Room)
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
403 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
AC UPS System - Feeder A
3
F
400
AC UPS System - Feeder B
3
F
VAC UPS System - Bypass
3
tion Infrastructure HVAC #1
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
F
400
VAC
40.00
50.00
0.900
0.80
0.60
N/A
80.19
N/A
3
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
3
F
400
VAC
71.50
84.12
1.000
0.85
0.53
N/A
121.41
N/A
4
11
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
tion Infrastructure HVAC #2
3
F
400
VAC
71.50
84.12
1.000
0.85
0.53
N/A
121.41
N/A
4
11
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
tion Infrastructure HVAC #3
3
F
400
VAC
71.50
84.12
1.000
0.85
0.53
N/A
121.41
N/A
4
11
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
Distribution Panel or Lighting & Small Power frastructure Substation
3
F
400
VAC
6.20
6.53
1.000
0.95
0.31
N/A
9.42
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
Distribution Panel Outdoor Lighting frastructure Substation
3
F
400
VAC
41.25
43.42
1.000
0.95
0.31
N/A
62.67
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
404 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Distribution Panel Emergency Lighting frastructure Substation
3
F
400
Distribution Panel Indoor Lighting dministration Building
3
F
Distribution Panel Small Power dministration Building
3
Distribution Panel Indoor Lighting rmitory Operator & Staff
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
10.80
11.37
1.000
0.95
0.31
N/A
16.41
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
400
VAC
12.40
13.05
1.000
0.95
0.31
N/A
18.84
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
F
400
VAC
35.00
36.84
1.000
0.95
0.31
N/A
53.18
N/A
6
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
3
F
400
VAC
22.40
23.58
1.000
0.95
0.31
N/A
34.03
N/A
8
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
Distribution Panel Small Power rmitory Operator & Staff
3
F
400
VAC
99.00
104.21
1.000
0.95
0.31
N/A
150.41
N/A
7
16
1
4/C -
300
mm²
0.0799
0.0835
396
0.60
237.6
Distribution Panel Indoor Lighting itory Field Superintendent
3
F
400
VAC
12.82
13.49
1.000
0.95
0.31
N/A
19.48
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Distribution Panel Small Power itory Field Superintendent
3
F
400
VAC
54.50
57.37
1.000
0.95
0.31
N/A
82.80
N/A
6
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
405 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Distribution Panel Indoor Lighting Hall & Multipurpose Building
3
F
400
Distribution Panel Small Power Hall & Multipurpose Building
3
F
Distribution Panel ighting & Small Power Mosque
3
Distribution Panel Indoor Lighting Kitchen & Dining Hall
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
20.00
21.05
1.000
0.95
0.31
N/A
30.39
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
400
VAC
60.50
63.68
1.000
0.95
0.31
N/A
91.92
N/A
4
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
F
400
VAC
8.00
8.42
1.000
0.95
0.31
N/A
12.15
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
6.20
6.53
1.000
0.95
0.31
N/A
9.42
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
Distribution Panel Indoor Lighting Kitchen & Dining Hall
3
F
400
VAC
11.00
11.58
1.000
0.95
0.31
N/A
16.71
N/A
6
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
Distribution Panel ighting & Small Power aundry Center Building
3
F
400
VAC
6.40
6.74
1.000
0.95
0.31
N/A
9.72
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
Training Building Lighting DB
3
F
400
VAC
9.00
9.47
1.000
0.95
0.31
N/A
13.67
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.56
44.24
Distribution Panel Indoor Lighting edical Center Building
3
F
400
VAC
8.00
8.42
1.000
0.95
0.31
N/A
12.15
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
Distribution Panel Small Power edical Center Building
3
F
400
VAC
12.00
12.63
1.000
0.95
0.31
N/A
18.23
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
406 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Distribution Panel or Lighting & Small Power Security Gate House
3
F
400
Distribution Panel Indoor Lighting ation Maintenance Building
3
F
Distribution Panel Small Power ation Maintenance Building
3
Distribution Panel or Lighting & Small Power emical Storage Building
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.20
3.37
1.000
0.95
0.31
N/A
4.86
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
400
VAC
38.00
40.00
1.000
0.95
0.31
N/A
57.74
N/A
6
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
F
400
VAC
39.00
41.05
1.000
0.95
0.31
N/A
59.25
N/A
6
10
1
4/C -
70
mm²
0.343
0.0864
178
0.60
106.8
3
F
400
VAC
20.00
21.05
1.000
0.95
0.31
N/A
30.39
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
Distribution Panel Indoor Lighting ation Warehouse Building
3
F
400
VAC
30.00
31.58
1.000
0.95
0.31
N/A
45.58
N/A
3
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
Distribution Panel Small Power ation Warehouse Building
3
F
400
VAC
31.50
33.16
1.000
0.95
0.31
N/A
47.86
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Distribution Panel or Lighting & Small Power Telcom Building
3
F
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
Distribution Panel or Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
Distribution Panel or Lighting & Small Power Gate House Building
3
F
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
407 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Distribution Panel or Lighting & Small Power Gate House Building
3
F
400
Distribution Panel or Lighting & Small Power Gate House Building
3
F
Distribution Panel or Lighting & Small Power Guard House Building
3
Distribution Panel Indoor Lighting ire Emegency Station
Distribution Panel Small Power ire Emegency Station
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
400
VAC
3.80
4.00
1.000
0.95
0.31
N/A
5.77
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
F
400
VAC
3.60
3.79
1.000
0.95
0.31
N/A
5.47
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
3
F
400
VAC
2.80
2.95
1.000
0.95
0.31
N/A
4.25
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
3
F
400
VAC
9.50
10.00
1.000
0.95
0.31
N/A
14.43
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Distribution Panel Indoor Lighting Office Building
3
F
400
VAC
10.00
10.53
1.000
0.95
0.31
N/A
15.19
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Distribution Panel Small Power Office Building
3
F
400
VAC
44.50
46.84
1.000
0.95
0.31
N/A
67.61
N/A
7
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
Distribution Panel Indoor Lighting Laboratory Building
3
F
400
VAC
7.35
7.74
1.000
0.95
0.31
N/A
11.17
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Distribution Panel Small Power Laboratory Building
3
F
400
VAC
21.00
22.11
1.000
0.95
0.31
N/A
31.91
N/A
7
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
408 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
3
F
400
Station Genset Lighting DB
3
F
ster Point-1 Lighting DB Infrastructure Area
3
ster Point-2 Lighting DB Infrastructure Area
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.70
1.79
1.000
0.95
0.31
N/A
2.58
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
400
VAC
58.03
68.27
1.000
0.85
0.53
N/A
98.54
N/A
4
10
1
4/C -
70
mm²
0.343
0.0864
178
0.56
99.68
F
400
VAC
6.60
7.76
0.950
0.85
0.53
N/A
11.80
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
6.60
7.76
0.950
0.85
0.53
N/A
11.80
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
tory Building Sockets Outlet
3
F
400
VAC
163.20
192.00
1.000
0.85
0.53
N/A
277.13
N/A
-1
12
2
4/C -
120
mm²
0.197
0.0839
480
0.51
244.8
ory Field Manager Sockets Outlet
3
F
400
VAC
43.52
51.20
1.000
0.85
0.53
N/A
73.90
N/A
4
9
1
4/C -
50
mm²
0.494
0.0877
144
0.51
73.44
Distribution Panel Air Conditioning Laboratory Building
3
F
400
VAC
40.08
42.19
1.000
0.95
0.31
N/A
60.90
N/A
8
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
3
F
400
VAC
6.40
7.53
1.000
0.85
0.53
N/A
10.87
N/A
1
3
1
2/C -
4
mm²
5.88
0.1025
37
0.51
18.87
Distribution Panel or Lighting & Small Power hicle Fuel Station Shelter
mitory Field Manager AC
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
409 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Distribution Panel Air Conditioning rmitory Operator & Staff
3
F
400
Distribution Panel Air Conditioning itory Field Superintendent
3
F
Distribution Panel Air Conditioning en & Dinning Hall Building
3
Distribution Panel Air Conditioning Security Gate House Distribution Panel Air Conditioning Mosque
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
21.51
25.31
1.000
0.85
0.53
N/A
36.53
N/A
7
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
400
VAC
11.52
13.55
1.000
0.85
0.53
N/A
19.56
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
F
400
VAC
34.85
41.00
1.000
0.85
0.53
N/A
59.18
N/A
9
13
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
3
F
400
VAC
10.66
12.54
1.000
0.85
0.53
N/A
18.10
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
58.00
61.05
1.000
0.95
0.31
N/A
88.12
N/A
9
15
1
4/C -
240
mm²
0.0984
0.0842
351
0.60
210.6
Distribution Panel Air Conditioning all & Multipurposed Building
3
F
400
VAC
50.63
59.56
1.000
0.85
0.53
N/A
85.97
N/A
7
13
1
4/C -
150
mm²
0.16
0.0843
271
0.60
162.6
Distribution Panel Air Conditioning dministration Building
3
F
400
VAC
93.73
110.27
1.000
0.85
0.53
N/A
159.16
N/A
5
14
2
4/C -
185
mm²
0.1281
0.0851
608
0.60
364.8
Distribution Panel Air Conditioning ire Emergency Station
3
F
400
VAC
32.00
37.65
1.000
0.85
0.53
N/A
54.34
N/A
5
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
Distribution Panel Air Conditioning edical Center Building
3
F
400
VAC
23.98
28.21
1.000
0.85
0.53
N/A
40.72
N/A
4
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
410 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Distribution Panel Air Conditioning aundry Center Building
3
F
400
Training Building AC
3
F
Recreation Center AC
3
Distribution Panel Air Conditioning ation Maintenance Building
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
19.00
22.35
1.000
0.85
0.53
N/A
32.26
N/A
7
9
1
4/C -
50
mm²
0.494
0.0877
144
0.60
86.40
400
VAC
16.00
18.82
1.000
0.85
0.53
N/A
27.17
N/A
3
5
1
2/C -
10
mm²
2.34
0.093
61
0.51
31.11
F
400
VAC
16.00
18.82
1.000
0.85
0.53
N/A
27.17
N/A
3
5
1
2/C -
10
mm²
2.34
0.093
61
0.51
31.11
3
F
400
VAC
42.27
49.73
1.000
0.85
0.53
N/A
71.78
N/A
9
14
2
4/C -
185
mm²
0.1281
0.0851
608
0.60
364.8
Distribution Panel Air Conditioning emical Storage Building
3
F
400
VAC
53.65
63.12
1.000
0.85
0.53
N/A
91.10
N/A
7
13
3
4/C -
150
mm²
0.16
0.0843
813
0.60
487.8
Distribution Panel Air Conditioning ation Warehouse Building
3
F
400
VAC
66.68
78.45
1.000
0.85
0.53
N/A
113.23
N/A
8
15
2
4/C -
240
mm²
0.0984
0.0842
702
0.60
421.2
Office AC
3
F
400
VAC
16.00
18.82
1.000
0.85
0.53
N/A
27.17
N/A
3
5
1
2/C -
10
mm²
2.34
0.093
61
0.51
31.11
Diesel Station Genset
3
F
400
VAC
8.00
9.41
1.000
0.85
0.53
N/A
13.58
N/A
0
2
1
2/C -
2.5
mm²
9.45
0.1086
29
0.51
14.79
Distribution Panel Air Conditioning Telcom Building
3
F
400
VAC
28.90
34.00
1.000
0.85
0.53
N/A
49.07
N/A
7
11
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
411 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Distribution Panel Air Conditioning Office Building
3
F
400
Distribution Panel Air Conditioning Gate House
3
F
Distribution Panel Air Conditioning Gate House
3
Distribution Panel Air Conditioning Gate House
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
37.74
39.73
1.000
0.95
0.31
N/A
57.34
N/A
7
11
1
4/C -
95
mm²
0.247
0.0842
211
0.60
126.6
400
VAC
7.06
7.43
1.000
0.95
0.31
N/A
10.73
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
F
400
VAC
7.06
7.43
1.000
0.95
0.31
N/A
10.73
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
7.06
7.43
1.000
0.95
0.31
N/A
10.73
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
Distribution Panel Air Conditioning Gate House
3
F
400
VAC
7.06
7.43
1.000
0.95
0.31
N/A
10.73
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Distribution Panel Air Conditioning Guard House
3
F
400
VAC
3.54
3.73
1.000
0.95
0.31
N/A
5.38
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
Potable Water Pump
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
on Inhibitor Injection Pump A
3
M
400
VAC
0.00
0.00
0.772
0.86
0.51
0.50
0.00
0.00
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.56
25.76
412 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
on Inhibitor Injection Pump B
3
M
400
thanol Injection Pump A
3
M
thanol Injection Pump B
3
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.00
0.00
0.772
0.86
0.51
0.50
0.00
0.00
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
400
VAC
0.00
0.00
0.802
0.85
0.53
0.50
0.00
0.00
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
M
400
VAC
0.00
0.00
0.802
0.85
0.53
0.50
0.00
0.00
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
3
M
400
VAC
18.50
20.33
0.924
0.91
0.41
0.50
31.76
206.42
3
5
1
3/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC UPS System - Feeder A
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
AC UPS System - Feeder B
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
VAC UPS System - Bypass
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
71.50
84.12
0.900
0.85
0.53
N/A
134.90
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
Close Drain Pump
Well Pad Substation Building HVAC #1
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
413 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Well Pad Substation Building HVAC #2
3
F
400
Well Pad Substation Building HVAC #3
3
F
3
or Lighting and Small Power
r Lighting and Small Power
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
71.50
84.12
0.900
0.85
0.53
N/A
134.90
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
400
VAC
71.50
84.12
0.900
0.85
0.53
N/A
134.90
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
F
400
VAC
3.00
3.49
1.000
0.86
0.51
N/A
5.04
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
3
F
400
VAC
24.22
30.28
1.000
0.80
0.60
N/A
43.70
N/A
3
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
3
F
400
VAC
3.70
4.63
1.000
0.80
0.60
N/A
6.68
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
Emergency Lighting (Outdoor & Indoor)
3
F
400
VAC
7.27
9.08
1.000
0.80
0.60
N/A
13.11
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
uster Point Lighting DB Central Wellpad
3
F
400
VAC
6.60
7.76
0.950
0.85
0.53
N/A
11.80
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Potable Water Pump
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Flare Package
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
414 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
on Inhibitor Injection Pump A
3
M
400
on Inhibitor Injection Pump B
3
M
thanol Injection Pump A
3
thanol Injection Pump B
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.00
0.00
0.772
0.86
0.51
0.50
0.00
0.00
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.56
25.76
400
VAC
0.00
0.00
0.772
0.86
0.51
0.50
0.00
0.00
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.56
25.76
M
400
VAC
0.00
0.00
0.802
0.85
0.53
0.50
0.00
0.00
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.56
25.76
3
M
400
VAC
0.00
0.00
0.802
0.85
0.53
0.50
0.00
0.00
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.56
25.76
3
M
400
VAC
45.00
51.14
0.939
0.88
0.47
0.50
78.60
510.92
5
10
1
3/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
AC UPS System - Feeder A
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
AC UPS System - Feeder B
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
VAC UPS System - Bypass
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
Close Drain Pump
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
415 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Well Pad Substation Building HVAC #1
3
F
400
Well Pad Substation Building HVAC #2
3
F
Well Pad Substation Building HVAC #3
3
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
71.50
84.12
0.900
0.85
0.53
N/A
134.90
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
400
VAC
71.50
84.12
0.900
0.85
0.53
N/A
134.90
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
F
400
VAC
71.50
84.12
0.900
0.85
0.53
N/A
134.90
N/A
4
12
1
4/C -
120
mm²
0.197
0.0839
240
0.60
144.0
3
F
400
VAC
3.00
3.49
1.000
0.86
0.51
N/A
5.04
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
or Lighting and Small Power
3
F
400
VAC
36.00
45.00
1.000
0.80
0.60
N/A
64.95
N/A
3
8
1
4/C -
35
mm²
0.669
0.0883
122
0.60
73.20
r Lighting and Small Power
3
F
400
VAC
3.70
4.63
1.000
0.80
0.60
N/A
6.68
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
Emergency Lighting (Outdoor & Indoor)
3
F
400
VAC
9.60
12.00
1.000
0.80
0.60
N/A
17.32
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
uster Point Lighting DB East Wellpad
3
F
400
VAC
6.60
7.76
0.950
0.85
0.53
N/A
11.80
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
FLARE PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
416 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Gas Metering Stream-A Inlet Line
3
M
400
Gas Metering Stream-B Inlet Line
3
M
OV Gas Cross-over Line
3
Potable Water Pump
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.50
1.88
0.900
0.80
0.60
0.50
3.01
19.55
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.56
20.72
400
VAC
1.50
1.88
0.900
0.80
0.60
0.50
3.01
19.55
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.56
20.72
M
400
VAC
1.50
1.88
0.900
0.80
0.60
0.50
3.01
19.55
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.56
20.72
3
M
400
VAC
0.37
0.46
0.710
0.80
0.60
0.50
0.94
6.11
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
trument Air Compressor
3
M
400
VAC
11.00
12.50
0.912
0.88
0.47
0.50
19.78
128.59
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
ering 230VAC UPS System Feeder A
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
ering 230VAC UPS System Feeder B
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
ering 230VAC UPS System Bypass
3
F
400
VAC
24.00
30.00
0.900
0.80
0.60
N/A
48.11
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
417 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ing Station Building HVAC
3
F
400
ndoor Lighting Panel
3
F
ng Station Building Socket Outlet
3
Outdoor Lighting Panel
mergency Lighting Panel (Outdoor & Indoor)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
5.20
6.50
1.000
0.80
0.60
N/A
9.38
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
400
VAC
16.43
19.33
1.000
0.85
0.53
N/A
27.90
N/A
3
5
1
4/C -
10
mm²
2.34
0.093
61
0.60
36.60
F
400
VAC
5.00
6.25
1.000
0.80
0.60
N/A
9.02
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
3
F
400
VAC
29.00
36.25
1.000
0.80
0.60
N/A
52.32
N/A
3
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
3
F
400
VAC
7.00
8.24
1.000
0.85
0.53
N/A
11.89
N/A
2
4
1
4/C -
6
mm²
3.93
0.098
46
0.60
27.60
ing Station Welding Outlet
3
F
400
VAC
13.00
13.27
0.950
0.98
0.20
N/A
20.15
N/A
4
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
Muster Point es Gas Metering Station
3
F
400
VAC
6.60
7.76
0.950
0.85
0.53
N/A
11.80
N/A
5
7
1
4/C -
25
mm²
0.927
0.0908
101
0.60
60.60
418 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
Space Heater (Continuous) GPF (Qty=73 ea)
1
M
230
Space Heater (Intermittent) GPF (Qty=6 ea)
1
M
r Space Heater (Stand-by) GPF (Qty=105 ea)
1
Heater for Close Drain Pump Central Wellpad
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.23
0.23
0.95
0.98
0.20
0.50
1.07
6.98
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
230
VAC
0.23
0.23
0.95
0.98
0.20
0.50
1.07
6.98
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
M
230
VAC
0.23
0.23
0.95
0.98
0.20
0.50
1.07
6.98
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
M
230
VAC
0.20
0.20
0.95
1.00
0.00
0.50
0.92
5.95
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Heater for Close Drain Pump East Wellpad
1
M
230
VAC
0.20
0.21
1.00
0.95
0.31
0.50
0.92
5.95
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
STG-A Space Heater
1
M
230
VAC
2.25
2.25
0.900
1.00
0.00
0.50
10.87
70.65
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
STG-B Space Heater
1
M
230
VAC
2.25
2.25
0.900
1.00
0.00
0.50
10.87
70.65
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
419 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
UCP STG-A
1
F
210
attery Charger STG-A
1
F
CP Essential Generator
1
Charger Essential Generator
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.05
1.000
0.95
0.31
N/A
5.01
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Motor Charging VCB for 420-SWG-0001
1
M
210
VAC
1.80
1.80
0.900
1.00
0.00
0.50
9.52
61.90
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
Motor Charging VCB for 420-SWG-0002
1
M
210
VAC
3.00
3.00
0.900
1.00
0.00
0.50
15.87
103.17
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
PCS REMOTE I/O
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
VAC CONTROL PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
420 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
1
F
210
ECMS PRINTER
1
F
LCP STG-A
1
SIS REMOTE I/O
F&G REMOTE I/O
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
210
VAC
0.70
0.70
0.900
1.00
0.00
N/A
3.70
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
AD SHEDDING PANEL-A
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
RGENCY LIGHTING DB (outdoor & indoor)
1
F
210
VAC
7.20
7.20
0.900
1.00
0.00
N/A
38.10
N/A
5
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
TELECOM CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
HP BOILER CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
MS NETWORK SERVER
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
421 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
LP BOILER CABINET
1
F
210
MAIN ECMS-A PANEL
1
F
PAGA CABINET
1
FACP CABINET
UCP STG-B
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
210
VAC
1.50
1.50
0.900
1.00
0.00
N/A
7.94
N/A
3
4
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
attery Charger STG-B
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
P Emergency Generator
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
tery Charger Emergency Generator
1
F
210
VAC
0.50
0.60
0.842
0.84
0.00
N/A
3.37
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
422 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Motor Charging VCB for 420-SWG-0003
1
M
210
Motor Charging VCB for 420-SWG-0004
1
M
Motor Charging VCB for 420-SWG-0005
1
PCS REMOTE I/O
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
0.50
2.65
17.20
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
M
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
SIS REMOTE I/O
1
F
210
VAC
0.70
0.70
0.900
1.00
0.00
N/A
3.70
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F&G REMOTE I/O
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS OPC SERVER
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
LCP STG-B
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
CP ESSENTIAL GEN
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
423 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
CMS WORK STATION
1
F
210
MS NETWORK SWITCH
1
F
AD SHEDDING PANEL-B
1
TELECOM CABINET
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
HP BOILER CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
LP BOILER CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
MAIN ECMS-B PANEL
1
F
210
VAC
1.50
1.50
0.900
1.00
0.00
N/A
7.94
N/A
3
4
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
PAGA CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
424 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Motor Charging VCB : 231-SWG-0001
1
M
210
Motor Charging ACB : 231-SWG-0002
1
M
S REMOTE I/O PANEL
1
VAC CONTROL PANEL
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
2.20
2.20
0.900
1.00
0.00
0.50
11.64
75.66
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
S REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
S REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
G REMOTE I/O PANEL
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS PANEL
PAGA CABINET
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
425 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
VRU LCP
1
F
210
OTE I/O ECMS-A PANEL
1
F
E GAS COMPRESSOR LCP
1
HP/LP A FLARE LCP
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
TEG LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
SRU LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
TGU LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
1
F
210
VAC
3.50
3.50
0.900
1.00
0.00
N/A
18.52
N/A
9
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
GAS COMPRESSOR LCP
DB at Instrument Building 280A-B-9001
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
426 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Motor Charging VCB : 231-SWG-0003
1
M
210
1
F
ECMS PANEL
1
VRU LCP
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
0.50
2.65
17.20
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
CMS WORKSTATION
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
NETWORK SWITCH
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
RGENCY LIGHTING DB (outdoor & indoor)
1
F
210
VAC
8.80
8.80
0.900
1.00
0.00
N/A
46.56
N/A
6
8
1
2/C -
35
mm²
0.6690
0.0753
122
0.60
73.20
S REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
S REMOTE I/O PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
427 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Motor Charging VCB : 231-SWG-0004
1
M
210
1
F
1
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
E GAS COMPRESSOR LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
GAS COMPRESSOR LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
TEG LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
SRU LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
G REMOTE I/O PANEL
PAGA CABINET
OTE I/O ECMS-B PANEL
FACP PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
428 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
TGU LCP
1
F
210
Motor Charging VCB 280-SWG-0001
1
M
Motor Charging ACB : 280-SWG-0002
1
S REMOTE I/O PANEL
VAC CONTROL PANEL
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
210
VAC
1.40
1.40
0.900
1.00
0.00
0.50
7.41
48.15
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
M
210
VAC
0.50
0.50
0.900
1.00
0.00
0.50
2.65
17.20
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
ECMS PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
PAGA CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
MOTE I/O PANEL (280A-B9001)
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
429 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
G REMOTE I/O PANEL
1
F
210
OTE I/O ECMS-A PANEL
1
F
NETWORK SWITCH
1
DB at Instrument Building 280B-B-9001
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
3.50
3.50
0.900
1.00
0.00
N/A
18.52
N/A
9
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
1
M
210
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
MOTE I/O PANEL (280A-B9001)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
G REMOTE I/O PANEL
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Motor Charging VCB : 280-SWG-0003
ECMS PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
430 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
CMS WORKSTATION
1
F
210
NETWORK SWITCH
1
F
RGENCY LIGHTING DB (outdoor & indoor)
1
S REMOTE I/O PANEL
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.80
0.80
0.900
1.00
0.00
N/A
4.23
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
F
210
VAC
10.40
10.40
0.900
1.00
0.00
N/A
55.03
N/A
5
8
1
2/C -
35
mm²
0.6690
0.0753
122
0.60
73.20
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
FACP PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Motor Charging VCB 480-SWG-0001
1
M
210
VAC
2.00
2.00
0.900
1.00
0.00
0.50
10.58
68.78
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
PAGA CABINET
OTE I/O ECMS-B PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
431 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Motor Charging ACB : 480-SWG-0002
1
M
210
S REMOTE I/O PANEL
1
F
VAC CONTROL PANEL
1
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.30
0.30
0.900
1.00
0.00
0.50
1.59
10.32
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
UMENT AIR COMPRESSORA LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
UMENT AIR COMPRESSORB LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
UMENT AIR COMPRESSORC LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
S REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
G REMOTE I/O PANEL
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
432 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
RGENCY LIGHTING DB (outdoor & indoor)
1
F
210
OTE I/O ECMS-A PANEL
1
F
PAGA CABINET
1
NETWORK SWITCH
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
4.00
4.00
0.900
1.00
0.00
N/A
21.16
N/A
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
FACP PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
AIR MANAGER LCP
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
S REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
G REMOTE I/O PANEL
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
433 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
ECMS PANEL
1
F
210
1
F
1
UMENT AIR DRYER-A LCP
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
UMENT AIR DRYER-B LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
UMENT AIR DRYER-C LCP
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
WATER PANEL BATTERY CHARGER-A
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
WATER PANEL BATTERY CHARGER-B
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
S REMOTE I/O PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
CMS WORKSTATION
FACP PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
434 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
TELECOM CABINET
1
F
210
OTE I/O ECMS-B PANEL
1
F
1
CS SYSTEM CABINET
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
IS SYSTEM CABINET
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
&G SYSTEM CABINET
1
F
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
PAGA CABINET
FACP PANEL
S SYSTEM COMPUTER
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
435 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
1
F
210
1
F
1
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ACKBONE PATCH PANEL
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
3
4
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
M SYSTEM CABINET 2
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
SOE WORKSTATION
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
MONITOR WORKSTATION
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
RE STATION MONITOR
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
APPLICATION COMPUTER
MM SERVER
ESS MONITORING COMP
RTS SERVER
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
436 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
1
F
210
1
F
CMS-A WORKSTATION
1
WE SYSTEM CABINET
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.60
0.60
0.900
1.00
0.00
N/A
3.17
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
ATOR TRAINING SYSTEM CABINET
1
F
210
VAC
0.60
0.60
0.900
1.00
0.00
N/A
3.17
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
CS SYSTEM CABINET
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
VAC CONTROL PANEL
ECMS-A PANEL
M SYSTEM CABINET 1
PAGA CABINET
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
437 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
IS SYSTEM CABINET
1
F
210
&G SYSTEM CABINET
1
F
FACP PANEL
1
CCTV SERVER
EDMS SERVER
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.20
0.20
0.900
1.00
0.00
N/A
1.06
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.30
1.30
0.900
1.00
0.00
N/A
6.88
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
APMS SERVER
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
EPMS SERVER
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.30
1.30
0.900
1.00
0.00
N/A
6.88
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
IS BACK-UP SERVER
TORIAN OPC SERVER
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
438 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
PRINTER
1
F
210
1
F
CCTV SYSTEM
1
CCTV MONITOR
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.69
0.69
0.900
1.00
0.00
N/A
3.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.50
1.50
0.900
1.00
0.00
N/A
7.94
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
210
VAC
0.80
0.80
0.900
1.00
0.00
N/A
4.23
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
PAGA STATION
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
PCS PLASMA TV
1
F
210
VAC
1.87
1.87
0.900
1.00
0.00
N/A
9.87
N/A
3
4
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
M SYSTEM CABINET 2
1
F
210
VAC
0.65
0.65
0.900
1.00
0.00
N/A
3.44
N/A
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
NETWORK SWITCH
1
F
210
VAC
1.60
1.60
0.900
1.00
0.00
N/A
8.47
N/A
3
4
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
SIS CONSOLE
1
F
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ACKBONE PATCH PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
439 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
F&G CONSOLE
1
F
210
ECMS-B PANEL
1
F
PCS EWS
1
ESD/F&G EWS
AMS EWS
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
M SYSTEM CABINET 1
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
ATOR TRAINING SYSTEM CABINET
1
F
210
VAC
0.60
0.60
0.900
1.00
0.00
N/A
3.17
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
WE SYSTEM CABINET
PAGA CABINET
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
440 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
RGENCY LIGHTING DB (outdoor & indoor) 211-DPE-0001
1
F
210
11 kV Switchgear frastructure Substation (BUS A)
1
F
ack-Up Genset Charger
1
0 VAC Switchgear/MCC frastructure Substation (BUS A)
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
10.80
10.80
0.900
1.00
0.00
N/A
57.14
N/A
4
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS Workstation
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
G REMOTE I/O PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
441 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Telecom UPS DB
1
F
210
ack-Up Genset Charger
1
F
0 VAC Switchgear/MCC frastructure Substation (BUS B)
1
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
13.40
13.40
0.900
1.00
0.00
N/A
70.90
N/A
4
8
1
2/C -
35
mm²
0.6690
0.0753
122
0.60
73.20
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
11 kV Switchgear frastructure Substation (BUS B)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
NETWORK SWITCH
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
G REMOTE I/O PANEL
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS Panel
Telecom Cabinet
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
442 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
RTU/SCADA Cabinet
1
F
210
Flow Comp Cabinet
1
F
1
ECMS Panel
ECMS PC
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.00
1.00
0.900
1.00
0.00
N/A
5.29
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
11 kV Switchgear ntral Well Pad Substation (BUS A)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ack-Up Genset Charger
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
0 VAC Switchgear/MCC Well Pad Central (BUS A)
Telecom Cabinet
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
443 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
RTU/SCADA Cabinet
1
F
210
Flow Comp Cabinet
1
F
1
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Emergency Lighting (Outdoor & Indoor)
1
F
210
VAC
5.60
5.60
0.900
1.00
0.00
N/A
29.63
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
FLARE PANEL
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
0 VAC Switchgear/MCC Well Pad Central (BUS B) ECMS Panel
11 kV Switchgear ntral Well Pad Substation (BUS B)
VAC CONTROL PANEL
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
444 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Telecom Cabinet
1
F
210
RTU/SCADA Cabinet
1
F
Flow Comp Cabinet
1
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS PC
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
11 kV Switchgear ast Well Pad Substation (BUS A)
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ack-Up Genset Charger
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
0 VAC Switchgear/MCC ast Well Pad Substation (BUS A)
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
445 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Telecom Cabinet
1
F
210
RTU/SCADA Cabinet
1
F
Flow Comp Cabinet
1
0 VAC Switchgear/MCC ast Well Pad Substation (BUS B) ECMS Panel
11 kV Switchgear ast Well Pad Substation (BUS B)
RGENCY LIGHTING DB (outdoor & indoor) 212-DPE-0001 FLARE PANEL
VAC CONTROL PANEL
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.30
0.30
0.900
1.00
0.00
N/A
1.59
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
9.60
9.60
0.900
1.00
0.00
N/A
50.79
N/A
4
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
446 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Telecom Cabinet
1
F
210
RTU/SCADA Cabinet
1
F
low Computer System
1
Laser Jet Printer
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
1.80
1.80
0.900
1.00
0.00
N/A
9.52
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Sales Gas Ccmputer
1
F
210
VAC
0.70
0.70
0.900
1.00
0.00
N/A
3.70
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS PC
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
ack-Up Genset Charger
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
447 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
0 VAC Switchgear/MCC s Gas Metering Substation (BUS A)
1
F
210
11 kV Switchgear s Gas Metering Substation (BUS A)
1
F
Telecom Cabinet
1
RTU/SCADA Cabinet
Dot Maztrix Printer
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
2.00
2.00
0.900
1.00
0.00
N/A
10.58
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
1
F
210
VAC
0.40
0.40
0.900
1.00
0.00
N/A
2.12
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.10
0.10
0.900
1.00
0.00
N/A
0.53
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
low Computer System
1
F
210
VAC
1.80
1.80
0.900
1.00
0.00
N/A
9.52
N/A
3
4
1
2/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
ECMS Panel
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
Back-Up Genset UCP
1
F
210
VAC
0.75
0.75
0.900
1.00
0.00
N/A
3.97
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
448 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
1
F
210
VAC CONTROL PANEL
1
F
0 VAC Switchgear/MCC s Gas Metering Substation (BUS B)
1
11 kV Switchgear s Gas Metering Substation (BUS B)
Description
Power
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
4.00
4.00
0.900
1.00
0.00
N/A
21.16
N/A
5
6
1
2/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
210
VAC
0.50
0.50
0.900
1.00
0.00
N/A
2.65
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
witchgear: 420-SWG-0001A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
witchgear: 420-SWG-0001B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
RGENCY LIGHTING DB (outdoor & indoor)
Volt
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
449 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
AC MCC : 420-MCC-0003A
1
F
108
AC MCC : 420-MCC-0003B
1
F
AC MCC : 420-MCC-0005A
1
AC MCC : 420-MCC-0004A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC MCC : 420-MCC-0004B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC MCC : 420-MCC-0005B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Switchgear: 420-SWG-0002A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
Switchgear: 420-SWG-0002B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
RAFO 420-TRF-0001A
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
450 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
RAFO 420-TRF-0001B
1
F
108
RAFO 420-TRF-0002A
1
F
RAFO 420-TRF-0002B
1
RAFO 420-TRF-0003A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
RAFO 420-TRF-0003B
1
F
108
VDC
0.10
1.00
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
V Switchgear / MCC MV 1A Substation-2 (Train-A)
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
V Switchgear / MCC MV 1B Substation-2 (Train-A)
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
451 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
AC Switchgear / MCC LV 2A Substation-2 (Train-A)
1
F
108
AC Switchgear / MCC LV 2B Substation-2 (Train-A)
1
F
AC Switchgear / MCC LV 3A Substation-2 (Train-A)
1
AC Switchgear / MCC LV 3B Substation-2 (Train-A)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC Switchgear / MCC LV 4A Substation-2 (Train-A)
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC Switchgear / MCC LV 4B Substation-2 (Train-A)
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
RAFO 231-TRF-0001A
1
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
RAFO 231-TRF-0001B
1
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
RAFO 231-TRF-0002A
1
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
452 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
RAFO 231-TRF-0002B
1
F
108
Switchgear: 280-SWG-0001A
1
F
Switchgear: 280-SWG-0001B
1
AC MCC : 280-MCC-0002A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC MCC : 280-MCC-0002B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC MCC : 280-MCC-0003A
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC MCC : 280-MCC-0003B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
RAFO 280-TRF-0001A
1
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
453 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
RAFO 280-TRF-0001B
1
F
108
Switchgear: 480-SWG-0001A
1
F
Switchgear: 480-SWG-0001B
1
AC MCC : 480-MCC-0002A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
AC MCC : 480-MCC-0002B
1
F
108
VDC
1.00
1.00
0.900
1.00
0.00
N/A
10.29
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
RAFO 480-TRF-0001A
1
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
RAFO 480-TRF-0001B
1
F
108
VDC
0.10
0.10
0.900
1.00
0.00
N/A
1.03
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
454 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ery Rack for Substation-1 AC UPS System - Feeder A
1
F
220
ery Rack for Substation-1 AC UPS System - Feeder B
1
F
ery Rack for Substation-2 AC UPS System - Feeder A
1
ery Rack for Substation-2 AC UPS System - Feeder B
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
61.04
61.04
0.800
1.00
0.00
N/A
346.80
N/A
4
14
2
2/C -
185
mm²
0.1281
0.0720
608
0.60
364.8
220
VDC
61.04
61.04
0.800
1.00
0.00
N/A
346.80
N/A
4
14
2
2/C -
185
mm²
0.1281
0.0720
608
0.60
364.8
F
220
VDC
25.43
25.43
0.800
1.00
0.00
N/A
144.50
N/A
7
13
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
1
F
220
VDC
25.43
25.43
0.800
1.00
0.00
N/A
144.50
N/A
7
13
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
ery Rack for Substation-3 AC UPS System - Feeder A
1
F
220
VDC
27.88
27.88
0.800
1.00
0.00
N/A
158.40
N/A
6
13
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
ery Rack for Substation-3 AC UPS System - Feeder B
1
F
220
VDC
27.88
27.88
0.800
1.00
0.00
N/A
158.40
N/A
6
13
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
ery Rack for Substation-4 AC UPS System - Feeder A
1
F
220
VDC
27.88
27.88
0.800
1.00
0.00
N/A
158.40
N/A
6
13
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
ery Rack for Substation-4 AC UPS System - Feeder B
1
F
220
VDC
27.88
27.88
0.800
1.00
0.00
N/A
158.40
N/A
6
13
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
y Rack for Control Building AC UPS System - Feeder A
1
F
220
VDC
53.10
53.10
0.800
1.00
0.00
N/A
301.70
N/A
3
13
2
2/C -
150
mm²
0.1600
0.0712
542
0.60
325.2
455 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
y Rack for Control Building AC UPS System - Feeder B
1
F
220
ery Rack for Infrastructure AC UPS System - Feeder A
1
F
ery Rack for Infrastructure AC UPS System - Feeder B
1
y Rack for Central Wellpad AC UPS System - Feeder A
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
53.10
53.10
0.800
1.00
0.00
N/A
301.70
N/A
3
13
2
2/C -
150
mm²
0.1600
0.0712
542
0.60
325.2
220
VDC
53.10
53.10
0.800
1.00
0.00
N/A
301.70
N/A
3
13
2
2/C -
150
mm²
0.1600
0.0712
542
0.60
325.2
F
220
VDC
53.10
53.10
0.800
1.00
0.00
N/A
301.70
N/A
3
13
2
2/C -
150
mm²
0.1600
0.0712
542
0.60
325.2
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
y Rack for Central Wellpad AC UPS System - Feeder B
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
ery Rack for East Wellpad AC UPS System - Feeder A
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
ery Rack for East Wellpad AC UPS System - Feeder B
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
456 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
y Rack for Gas Metering C UPS System - Feeder A
1
F
220
y Rack for Gas Metering C UPS System - Feeder B
1
F
ery Rack for Substation-1 DC UPS System - Feeder A
1
ery Rack for Substation-1 DC UPS System - Feeder B
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
20.44
20.44
0.800
1.00
0.00
N/A
116.11
N/A
5
11
1
2/C -
95
mm² 0.2470 0.0711
211
0.60
126.6
220
VDC
20.44
20.44
0.800
1.00
0.00
N/A
116.11
N/A
5
11
1
2/C -
95
mm² 0.2470 0.0711
211
0.60
126.6
F
110
VDC
20.35
20.35
0.800
1.00
0.00
N/A
231.20
N/A
7
16
1
2/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
1
F
110
VDC
20.35
20.35
0.800
1.00
0.00
N/A
231.20
N/A
7
16
1
2/C -
300
mm²
0.0799
0.0704
396
0.60
237.6
ery Rack for Substation-2 DC UPS System - Feeder A
1
F
110
VDC
16.48
16.48
0.800
1.00
0.00
N/A
187.30
N/A
7
15
1
2/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
ery Rack for Substation-2 DC UPS System - Feeder B
1
F
110
VDC
16.48
16.48
0.800
1.00
0.00
N/A
187.30
N/A
7
15
1
2/C -
240
mm²
0.0984
0.0711
351
0.60
210.6
ery Rack for Substation-3 DC UPS System - Feeder A
1
F
110
VDC
12.72
12.72
0.800
1.00
0.00
N/A
144.50
N/A
7
13
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
ery Rack for Substation-3 DC UPS System - Feeder B
1
F
110
VDC
12.72
12.72
0.800
1.00
0.00
N/A
144.50
N/A
7
13
1
2/C -
150
mm²
0.1600
0.0712
271
0.60
162.6
457 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
ery Rack for Substation-4 DC UPS System - Feeder A
1
F
110
ery Rack for Substation-4 DC UPS System - Feeder B
1
F
y Rack for Central Wellpad AC UPS System - Feeder A
1
y Rack for Central Wellpad AC UPS System - Feeder B
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VDC
8.85
8.85
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
110
VDC
8.85
8.85
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
ery Rack for East Wellpad AC UPS System - Feeder A
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
ery Rack for East Wellpad AC UPS System - Feeder B
1
F
220
VDC
17.71
17.71
0.800
1.00
0.00
N/A
100.60
N/A
5
10
1
2/C -
70
mm²
0.3430
0.0734
178
0.60
106.8
458 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
3
F
400
3
F
W Normal HPS Wellglass
3
250W HPS Streetlight
W Normal Fluorescent Light
Description
W Normal HPS Floodlight
Emergency HPS Floodlight
Emergency Fluorescent Light
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
25.60
26.12
0.950
0.98
0.20
N/A
39.69
N/A
3
6
1
4/C -
16
mm²
1.47
0.091
79
0.60
47.40
400
VAC
0.40
0.41
0.950
0.98
0.20
N/A
0.62
N/A
0
2
1
4/C -
2.5
mm²
9.45
0.1086
29
0.60
17.40
F
400
VAC
0.15
0.15
0.950
0.98
0.20
N/A
0.23
N/A
0
2
1
4/C -
2.5
mm²
9.45
0.1086
29
0.60
17.40
3
F
400
VAC
0.25
0.26
0.950
0.98
0.20
N/A
0.39
N/A
0
2
1
4/C -
2.5
mm²
9.45
0.1086
29
0.60
17.40
1
F
230
VAC
0.07
0.07
0.900
1.00
0.00
N/A
0.35
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
1
F
230
VAC
0.07
0.07
0.900
1.00
0.00
N/A
0.35
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
459 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
W Normal HPS Floodlight (16 ea)
1
F
400
W Normal HPS Floodlight (14 ea)
1
F
W Normal HPS Floodlight (12 ea)
1
W Normal HPS Floodlight (10 ea)
Description
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
2.40
2.40
0.900
1.00
0.00
N/A
6.67
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
393
VAC
2.10
2.10
0.900
1.00
0.00
N/A
5.94
N/A
6
7
1
2/C -
25
mm²
0.9270
0.0779
101
0.60
60.60
F
392
VAC
1.80
1.80
0.900
1.00
0.00
N/A
5.10
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
1
F
391
VAC
1.50
1.50
0.900
1.00
0.00
N/A
4.26
N/A
4
5
1
2/C -
10
mm²
2.3400
0.0802
61
0.60
36.60
W Normal HPS Floodlight (8 ea)
1
F
390
VAC
1.20
1.20
0.900
1.00
0.00
N/A
3.42
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
W Normal HPS Floodlight (6 ea)
1
F
387
VAC
0.90
0.90
0.900
1.00
0.00
N/A
2.58
N/A
2
3
1
2/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
W Normal HPS Floodlight (4 ea)
1
F
385
VAC
0.60
0.60
0.900
1.00
0.00
N/A
1.73
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
W Normal HPS Floodlight (2 ea)
1
F
383
VAC
0.30
0.30
0.900
1.00
0.00
N/A
0.87
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
460 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
bution Board Guard House
3
F
400
oor Lighting Fluoroscent 2x36 W
1
F
1
Description
Air Conditioning
tdoor Lighting Floodlight 2x400 W Socket Outlet
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
4.40
5.00
0.912
0.88
0.47
N/A
7.91
N/A
4
6
1
3/C -
16
mm²
1.4700
0.0781
79
0.60
47.40
230
VAC
0.07
0.09
0.900
0.80
0.60
N/A
0.43
N/A
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
230
VAC
1.50
1.88
0.900
0.80
0.60
N/A
9.06
N/A
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
230
VAC
1.60
2.00
0.710
0.80
0.60
N/A
12.25
N/A
1
3
1
3/C -
4
mm²
5.8800
0.0899
37
0.60
22.20
1
F
230
VAC
1.20
1.50
0.710
0.80
0.60
N/A
9.19
N/A
0
2
1
3/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
461 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
3 Ph / 1 Ph
F/M
1
F
230
CWS Workstation
1
F
PCS System
1
Flow Comp System
1
Description
ADA-RTU Panel in PB-24
Power
Volt
Cos φ
Sin φ
Cos β (Start)
IFL
Ist
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
Impedace
No.of Run
Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
kW
kVA
p.u
p.u
p.u
p.u
Amp
Amp
VAC
5.00
5.68
0.912
0.88
0.47
N/A
27.09
N/A
2
4
1
3/C -
6
mm²
3.9300
0.0853
46
0.60
27.60
230
VAC
0.657
0.657
0.900
1.00
0.00
N/A
3.17
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
230
VAC
0.95
0.95
0.900
1.00
0.00
N/A
4.59
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
F
230
VAC
0.51
0.51
0.900
1.00
0.00
N/A
2.46
N/A
1
2
1
2/C -
2.5
mm²
9.4500
0.0961
29
0.60
17.40
462 of 522
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Volt
Power
kW
kVA
p.u
Cos φ
p.u
Sin φ
p.u
Cos β (Start)
p.u
ISC x √t k
er and C60H for Motor)
can be seen in the Doc. No. JTB-SF-E-LST-900-00013~00018, Electrical Cable Schedule.
ting fixtures will sum in the Electrical MTO.
463 of 522
IFL
Amp
Ist
Amp
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
No.of Run
Impedace Type
Current Carrying Capacit CCC
R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
Corretion Factor
Derate
Amp
APPENDIX-A
GAS DEVELOPMENT PROJECT FOR THE JAMBARAN-TIUNG BIRU FIELD CABLE SELECTION SUMMARY
Description
3 Ph / 1 Ph
F/M
Sin φ
Volt
Power
kW
=Sqrt (1-Cos² φ))
Lmax (Maximum Cable Length (m)) Ist (Motor Starting Current (Amp))
kVA
p.u
Cos φ
p.u
Sin φ
Cos β (Start)
p.u
p.u
IFL
Amp
Ist
Amp
Index
Voltage No. Equip System, Phase Type Vin
Selected Cable Correction
Load Data
No.of Run
Impedace Type R at 90°C
X at 50 Hz
Rated
Ω/km
Ω/km
Amp
n (Quantity of cables in parallel per phase)
AG (Above Ground Installation)
(Efficiency)
UG (Under Ground Installation)
Isc (Short circuit current )
464 of 522
Current Carrying Capacit CCC
Corretion Factor
Derate
Amp
APPENDIX-B Resistance and Reactance Cable For Calculation Reference Used for UPS load, Lighting, Space heater APPENDIX-C Resistance, Reactance and Current Carrying Capacity of Cable (Copper Conductor, XLPE insulated, Steel Wire Armor, PVC Sheathed, Comply to IEC standard 60502-1)
N2XRY 2x(1,5-300) mm² 0,6/1 kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal)
No
Current Carrying Capacities AC Resistance DC Resistance Cross Sectional Reactance at at 90 °C at 90 °C area (mm²) 50 Hz (Ω/km) in air Underground (Ω/km) (Ω/km) (Amp) (Amp)
Conductor S.C Current @ 1 second (Amp)
AdJust Table (In Air)
1
1.5
15.4300
0.0999
12.1000
26
26
212
26
1
2
2.5
9.4500
0.0961
7.4100
36
34
353
36
2
3
4
5.8800
0.0899
4.6100
49
44
564
49
3
4
6
3.9300
0.0853
3.0800
63
56
846
63
4
5
10
2.3400
0.0802
1.8300
86
73
1410
86
5
6
16
1.4700
0.0781
1.1500
115
95
2256
115
6
7
25
0.9270
0.0779
0.7270
149
121
3525
149
7
8
35
0.6690
0.0753
0.5240
185
146
4935
185
8
9
50
0.4940
0.0748
0.3870
225
173
7050
225
9
10
70
0.3430
0.0734
0.2680
289
213
9870
289
10
11
95
0.2470
0.0711
0.1930
352
252
13395
352
11
12
120
0.1970
0.0708
0.1530
410
287
16920
410
12
13
150
0.1600
0.0712
0.1240
473
324
21150
473
13
14
185
0.1281
0.0720
0.0991
542
363
26085
542
14
15
240
0.0984
0.0711
0.0754
641
419
33840
641
15
16
300
0.0799
0.0704
0.0601
741
474
42300
741
16
erence
AdJust Table (Underground)
26
1
34
2
44
3
56
4
73
5
95
6
121
7
146
8
173
9
213
10
252
11
287
12
324
13
363
14
419
15
474
16
Resistance and Reactance Cable For Calculation Reference Used For Motor 3 Phase APPENDIX-C
Resistance, Reactance and Current Carrying Capacity of Cable
(Copper Conductor, XLPE insulated, Steel Wire Armor, PVC Sheathed, Comply to IEC standard 60502-1)
N2XRY 3x(1,5-300) mm² 0,6/1 kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal) Current Carrying Capacities AC Resistance Reactance at DC Resistance Conductor S.C at 90 °C 50 Hz at 90 °C Current @ 1 in air Underground (Ω/km) (Ω/km) (Ω/km) second (Amp) (Amp) (Amp)
No
Cross Sectional area (mm²)
1
1.5
15.4300
0.0999
12.1000
23
22
212
23
1
2
2.5
9.4500
0.0961
7.4100
32
29
353
32
2
3
4
5.8800
0.0899
4.6100
42
37
564
42
3
4
6
3.9300
0.0853
3.0800
54
46
846
54
4
5
10
2.3400
0.0802
1.8300
75
61
1410
75
5
6
16
1.4700
0.0781
1.1500
100
79
2256
100
6
7
25
0.9270
0.0779
0.7270
127
101
3525
127
7
8
35
0.6690
0.0753
0.5240
158
122
4935
158
8
9
50
0.4940
0.0748
0.3870
192
144
7050
192
9
10
70
0.3430
0.0734
0.2680
246
178
9870
246
10
11
95
0.2470
0.0711
0.1930
298
211
13395
298
11
12
120
0.1970
0.0708
0.1530
346
240
16920
346
12
13
150
0.1600
0.0712
0.1240
399
271
21150
399
13
AdJust Table (In Air)
14
185
0.1281
0.0720
0.0991
456
304
26085
456
14
15
240
0.0984
0.0711
0.0754
538
351
33840
538
15
16
300
0.0799
0.0704
0.0601
621
396
42300
621
16
Notes
ence
AdJust Table (Underground)
22
1
29
2
37
3
46
4
61
5
79
6
101
7
122
8
144
9
178
10
211
11
240
12
271
13
304
14
351
15
396
16
APPENDIX-B Resistance and Reactance Cable For Calculation Reference APPENDIX-B.1 Resistance, Reactance and Current Carrying Capacity of 11 kV 3 Core Cable
APPENDIX-B.2
(Copper Conductor, XLPE insulated, Copper Tape Shielded, Galvanized Flat Steel Wire Armoured, Galvanized Steel Tape Binding, PVC Sheathed, Comply to IEC standard 60502-1)
(Copper Conductor, XLPE insulated, Copper Tape Shielded Steel Tape Binding, PVC Sheathed, Comply to IEC standar
XLPE/FSWA/PVC 3x(25-300) mm² 8.7/15 (17.5) kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal)
XLPE/FSWA/PVC 3x(25-300) mm² 6/10 (12) kV, Taken from Appr
Current Carrying Capacities No
No. Core and Cross Sectional area
AC Resistance at 90 °C (Ω/km)
Reactance at 50 Hz (Ω/km)
DC Resistance at 90 °C (Ω/km)
In air (Amp)
Underground (Amp)
Resistance, Reactance and Curre
Conductor S.C Current @ 1 second (Amp)
AdJust Table (In Air)
AdJust Table (Undergroun d)
No
No. Core and Cross AC Resistance Sectional area at 90 °C (Ω/km)
1
3C x 1.5 mm²
-
-
-
-
-
-
-
1
-
1
1
3C x 1.5 mm²
-
2
3C x 2.5 mm²
-
-
-
-
-
-
-
2
-
2
2
3C x 2.5 mm²
-
3
3C x 4 mm²
-
-
-
-
-
-
-
3
-
3
3
3C x 4 mm²
-
-
-
-
-
-
4
-
4
4
3C x 6 mm²
-
4
3C x 6 mm²
-
-
5
3C x 10 mm²
-
-
-
-
-
-
-
5
-
5
5
3C x 10 mm²
-
6
3C x 16 mm²
-
-
-
-
-
-
-
6
-
6
6
3C x 16 mm²
-
7
3C x 25 mm²
0.9270
0.1300
0.7270
143
129
4
143
7
129
7
7
3C x 25 mm²
0.9270
8
3C x 35 mm²
0.6690
0.1230
0.5240
172
154
5
172
8
154
8
8
3C x 35 mm²
0.6690
9
3C x 50 mm²
0.4940
0.1180
0.3870
205
181
7
205
9
181
9
9
3C x 50 mm²
0.4940
10
3C x 70 mm²
0.3430
0.1110
0.2680
253
220
10
253
10
220
10
10
3C x 70 mm²
0.3430
11
3C x 95 mm²
0.2470
0.1050
0.1930
307
263
13
307
11
263
11
11
3C x 95 mm²
0.2470
12
3C x 120 mm²
0.1970
0.1020
0.1530
352
298
17
352
12
298
12
12
3C x 120 mm²
0.1970
13
3C x 150 mm²
0.1600
0.0980
0.1240
397
332
21
397
13
332
13
13
3C x 150 mm²
0.1600
14
3C x 185 mm²
0.1281
0.0950
0.0991
453
374
26
453
14
374
14
14
3C x 185 mm²
0.1281
15
3C x 240 mm²
0.0984
0.0920
0.0754
529
431
34
529
15
431
15
15
3C x 240 mm²
0.0984
16
3C x 300 mm²
0.0799
0.0890
0.0601
599
482
42
599
16
482
16
16
3C x 300 mm²
0.0799
APPENDIX-B.3 Resistance, Reactance and Current Carrying Capacity of 0.6/1 kV 4 Core Cable
APPENDIX-B.4
(Copper Conductor, XLPE insulated, Steel Wire Armor, PVC Sheathed, Comply to IEC standard 60502-1)
(Copper Conductor, XLPE insulated, Steel Wire Armor, PV
4x(1,5-300) mm² 0,6/1 kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal)
3x(1,5-300) mm² 0,6/1 kV, Taken from Approved Manufacture L
Current Carrying Capacities No
1
No. Core and Cross Sectional area
4C x 1.5
AC Resistance at 90 °C (Ω/km)
Reactance at 50 Hz (Ω/km)
DC Resistance at 90 °C (Ω/km)
15.4300
0.1125
12.1000
In air (Amp) 23
Resistance, Reactance and Curre
Underground (Amp) 22
Conductor S.C Current @ 1 second (Amp)
212
AdJust Table (In Air) 23
1
AdJust Table (Undergroun d)
22
1
No
1
No. Core and Cross AC Resistance Sectional area at 90 °C (Ω/km)
3C x 1.5 mm²
15.4300
APPENDIX-B Resistance and Reactance Cable For Calculation Reference 2
4C x 2.5
9.4500
0.1086
7.4100
32
29
353
32
2
29
2
2
3C x 2.5 mm²
9.4500
3
4C x 4
5.8800
0.1025
4.6100
42
37
564
42
3
37
3
3
3C x 4 mm²
5.8800
4
4C x 6
3.9300
0.0980
3.0800
54
46
846
54
4
46
4
4
3C x 6 mm²
3.9300
5
4C x 10
2.3400
0.0930
1.8300
75
61
1410
75
5
61
5
5
3C x 10 mm²
2.3400
6
4C x 16
1.4700
0.0910
1.1500
100
79
2256
100
6
79
6
6
3C x 16 mm²
1.4700
7
4C x 25
0.9270
0.0908
0.7270
127
101
3525
127
7
101
7
7
3C x 25 mm²
0.9270
8
4C x 35
0.6690
0.0883
0.5240
158
122
4935
158
8
122
8
8
3C x 35 mm²
0.6690
9
4C x 50
0.4940
0.0877
0.3870
192
144
7050
192
9
144
9
9
3C x 50 mm²
0.4940
10
4C x 70
0.3430
0.0864
0.2680
246
178
9870
246
10
178
10
10
3C x 70 mm²
0.3430
11
4C x 95
0.2470
0.0842
0.1930
298
211
13395
298
11
211
11
11
3C x 95 mm²
0.2470
12
4C x 120
0.1970
0.0839
0.1530
346
240
16920
346
12
240
12
12
3C x 120 mm
0.1970
0.1240
399
271
21150
399
13
271
13
13
3C x 150 mm
0.1600
13
4C x 150
0.1600
0.0843
14
4C x 185
0.1281
0.0851
0.0991
456
304
26085
456
14
304
14
14
3C x 185 mm
0.1281
15
4C x 240
0.0984
0.0842
0.0754
538
351
33840
538
15
351
15
15
3C x 240 mm
0.0984
16
4C x 300
0.0799
0.0835
0.0601
621
396
42300
621
16
396
16
16
3C x 300 mm
0.0799
Note
APPENDIX-C Resistance, Reactance and Current Carrying Capacity of Cable (Copper Conductor, XLPE insulated, Steel Wire Armor, PVC Sheathed, Comply to IEC standard 60502-1) 2x(1,5-300) mm² 0,6/1 kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal) Current Carrying Capacities AC Resistance at 90 °C (Ω/km)
Reactance at 50 Hz (Ω/km)
DC Resistance at 90 °C (Ω/km)
1
2C x 1.5
15.4300
0.0999
12.1000
26
26
212
26
1
26
1
2
2C x 2.5
9.4500
0.0961
7.4100
36
34
353
36
2
34
2
3
2C x 4
5.8800
0.0899
4.6100
49
44
564
49
3
44
3
4
2C x 6
3.9300
0.0853
3.0800
63
56
846
63
4
56
4
5
2C x 10
2.3400
0.0802
1.8300
86
73
1410
86
5
73
5
6
2C x 16
1.4700
0.0781
1.1500
115
95
2256
115
6
95
6
7
2C x 25
0.9270
0.0779
0.7270
149
121
3525
149
7
121
7
8
2C x 35
0.6690
0.0753
0.5240
185
146
4935
185
8
146
8
9
2C x 50
0.4940
0.0748
0.3870
225
173
7050
225
9
173
9
10
2C x 70
0.3430
0.0734
0.2680
289
213
9870
289
10
213
10
No
in air (Amp)
Underground (Amp)
Conductor S.C Current @ 1 second (Amp)
AdJust Table (In Air)
No. Core and Cross Sectional area
AdJust Table (Undergroun d)
APPENDIX-B Resistance and Reactance Cable For Calculation Reference 11
2C x 95
0.2470
0.0711
0.1930
352
252
13395
352
11
252
11
12
2C x 120
0.1970
0.0708
0.1530
410
287
16920
410
12
287
12
13
2C x 150
0.1600
0.0712
0.1240
473
324
21150
473
13
324
13
14
2C x 185
0.1281
0.0720
0.0991
542
363
26085
542
14
363
14
15
2C x 240
0.0984
0.0711
0.0754
641
419
33840
641
15
419
15
16
2C x 300
0.0799
0.0704
0.0601
741
474
42300
741
16
474
16
APPENDIX-B ce and Reactance Cable For Calculation Reference APPENDIX-B.2
Resistance, Reactance and Current Carrying Capacity of 6.6 kV 3 Core Cable
(Copper Conductor, XLPE insulated, Copper Tape Shielded, Galvanized Flat Steel Wire Armoured, Galvanized Steel Tape Binding, PVC Sheathed, Comply to IEC standard 60502-1) XLPE/FSWA/PVC 3x(25-300) mm² 6/10 (12) kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal) Current Carrying Capacities Reactance at DC Resistance 50 Hz (Ω/km) at 90 °C (Ω/km)
APPENDIX-B.4
in air (Amp)
Underground (Amp)
Conductor S.C Current @ 1 second (Amp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.1220
0.7270
143
129
4
0.1150
0.5240
172
154
5
0.1100
0.3870
205
181
7
0.1040
0.2680
253
220
10
0.0990
0.1930
307
263
13
0.0960
0.1530
352
298
17
0.0930
0.1240
397
332
21
0.0900
0.0991
453
374
26
0.0870
0.0754
529
431
34
0.0840
0.0601
599
482
42
Resistance, Reactance and Current Carrying Capacity of 0.6/1 kV 3 Core Cable
(Copper Conductor, XLPE insulated, Steel Wire Armor, PVC Sheathed, Comply to IEC standard 60502-1) 3x(1,5-300) mm² 0,6/1 kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal) Current Carrying Capacities Reactance at DC Resistance 50 Hz (Ω/km) at 90 °C (Ω/km)
0.0999
12.1000
in air (Amp) 23
Underground (Amp) 22
Conductor S.C Current @ 1 second (Amp)
212
APPENDIX-B ce and Reactance Cable For Calculation Reference 0.0961
7.4100
32
29
353
0.0899
4.6100
42
37
564
0.0853
3.0800
54
46
846
0.0802
1.8300
75
61
1410
0.0781
1.1500
100
79
2256
0.0779
0.7270
127
101
3525
0.0753
0.5240
158
122
4935
0.0748
0.3870
192
144
7050
0.0734
0.2680
246
178
9870
0.0711
0.1930
298
211
13395
0.0708
0.1530
346
240
16920
0.0712
0.1240
399
271
21150
0.0720
0.0991
456
304
26085
0.0711
0.0754
538
351
33840
0.0704
0.0601
621
396
42300
Notes
APPENDIX-B ce and Reactance Cable For Calculation Reference
Resistance and Reactance Cable For Calculation Reference Used For Generator, Incoming Distribution board APPENDIX-C
Resistance, Reactance and Current Carrying Capacity of Cable
(Copper Conductor, XLPE insulated, Steel Wire Armor, PVC Sheathed, Comply to IEC standard 60502-1)
N2XRY 4x(1,5-300) mm² 0,6/1 kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal) Current Carrying Capacities AC Resistance DC Resistance Reactance at at 90 °C at 90 °C 50 Hz (Ω/km) In air Underground (Ω/km) (Ω/km) (Amp) (Amp)
Conductor S.C Current @ 1 second (Amp)
AdJust Table (In Air)
No
No. Core and Cross Sectional area
1
1.5
15.4300
0.1125
12.1000
23
22
212
23
1
2
2.5
9.4500
0.1086
7.4100
32
29
353
32
2
3
4
5.8800
0.1025
4.6100
42
37
564
42
3
4
6
3.9300
0.0980
3.0800
54
46
846
54
4
5
10
2.3400
0.0930
1.8300
75
61
1410
75
5
6
16
1.4700
0.0910
1.1500
100
79
2256
100
6
7
25
0.9270
0.0908
0.7270
127
101
3525
127
7
8
35
0.6690
0.0883
0.5240
158
122
4935
158
8
9
50
0.4940
0.0877
0.3870
192
144
7050
192
9
10
70
0.3430
0.0864
0.2680
246
178
9870
246
10
11
95
0.2470
0.0842
0.1930
298
211
13395
298
11
12
120
0.1970
0.0839
0.1530
346
240
16920
346
12
13
150
0.1600
0.0843
0.1240
399
271
21150
399
13
14
185
0.1281
0.0851
0.0991
456
304
26085
456
14
15
240
0.0984
0.0842
0.0754
538
351
33840
538
15
16
300
0.0799
0.0835
0.0601
621
396
42300
621
16
erence
AdJust Table (Underground)
22
1
29
2
37
3
46
4
61
5
79
6
101
7
122
8
144
9
178
10
211
11
240
12
271
13
304
14
351
15
396
16
Resistance and Reactance Cable For Calculation Reference Used For Generator, Incoming Distribution board APPENDIX-C
Resistance, Reactance and Current Carrying Capacity of Cable
(Copper Conductor, XLPE insulated, Copper Tape Shielded, Rounded Aluminium Wire Armoured, PVC Sheathed, Comply to IEC standard 60502-1) XLPE/AWA/PVC 1x(25-630) mm² 6/10 (12) kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal) Current Carrying Capacities AC Resistance DC Resistance Reactance at at 90 °C at 20 °C 50 Hz (Ω/km) In air at 30 oC Underground (Ω/km) (Ω/km) (Amp) at 20 oC(Amp)
Conductor S.C Current @ 1 second (kA)
AdJust Table (In Air)
No
No. Core and Cross Sectional area
1
1.5
-
-
-
-
-
-
-
1
2
2.5
-
-
-
-
-
-
-
2
3
4
-
-
-
-
-
-
-
3
4
6
-
-
-
-
-
-
-
4
5
10
-
-
-
-
-
-
-
5
6
16
-
-
-
-
-
-
-
6
7
25
0.9270
0.1510
0.7270
163
140
3.5
163
7
8
35
0.6690
0.1420
0.5240
198
166
4.5
198
8
9
50
0.4940
0.1360
0.3870
238
196
7.0
238
9
10
70
0.3430
0.1290
0.2680
296
239
9.8
296
10
11
95
0.2470
0.1210
0.1930
361
285
13.3
361
11
12
120
0.1960
0.1190
0.1530
417
323
16.9
417
12
13
150
0.1590
0.1150
0.1240
473
361
21.1
473
13
14
185
0.1272
0.1120
0.0991
543
406
26.0
543
14
15
240
0.0972
0.1080
0.0754
641
469
33.8
641
15
16
300
0.0779
0.1040
0.0601
735
526
42.3
735
16
17
400
0.0614
0.1010
0.0470
845
590
56.4
845
17
18
50
0.0482
0.0980
0.0366
940
655
70.5
940
18
19
630
0.0376
0.0940
0.0283
1080
740
88.8
1080
19
Resistance and Reactance Cable For Calculation Reference Used For Generator, Incoming Distribution board APPENDIX-C
Resistance, Reactance and Current Carrying Capacity of Cable
(Copper Conductor, XLPE insulated, Copper Tape Shielded, Galvanized Flat Steel Wire Armoured, Galvanized Steel Tape Binding, PVC Sheathed, Comply to IEC standard 60502-1) XLPE/FSWA/PVC 3x(25-630) mm² 6/10 (12) kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal)
No
No. Core and Cross Sectional area
AC Resistance DC Resistance Reactance at at 90 °C at 20 °C 50 Hz (Ω/km) (Ω/km) (Ω/km)
Current Carrying Capacities
Conductor S.C Current @ 1 second (kA)
AdJust Table (In Air)
AC Resistance DC Resistance Reactance at at 90 °C at 20 °C 50 Hz (Ω/km) In air at 30 oC Underground (Ω/km) (Ω/km) (Amp) at 20 oC(Amp)
Conductor S.C Current @ 1 second (kA)
AdJust Table (In Air)
No
No. Core and Cross Sectional area
1
1.5
-
-
-
-
-
-
-
1
2
2.5
-
-
-
-
-
-
-
2
3
4
-
-
-
-
-
-
-
3
4
6
-
-
-
-
-
-
-
4
5
10
-
-
-
-
-
-
-
5
6
16
-
-
-
-
-
-
-
6
7
25
0.9270
0.1220
0.7270
143
129
3.5
143
7
8
35
0.6690
0.1150
0.5240
172
154
4.5
172
8
9
50
0.4940
0.1100
0.3870
205
181
7.0
205
9
10
70
0.3430
0.1040
0.2680
253
220
9.8
253
10
11
95
0.2470
0.0990
0.1930
307
263
13.3
307
11
12
120
0.1970
0.0960
0.1530
352
298
16.9
352
12
13
150
0.1600
0.0930
0.1240
397
332
21.1
397
13
14
185
0.1281
0.0900
0.0991
453
374
26.0
453
14
15
240
0.0984
0.0870
0.0754
529
431
33.8
529
15
16
300
0.0799
0.0840
0.0601
599
482
42.3
599
16
erence
AdJust Table (Underground)
-
1
-
2
-
3
-
4
-
5
-
6
140
7
166
8
196
9
239
10
285
11
323
12
361
13
406
14
469
15
526
16
590
17
655
18
740
19
erence
AdJust Table (Underground)
AdJust Table (Underground)
-
1
-
2
-
3
-
4
-
5
-
6
129
7
154
8
181
9
220
10
263
11
298
12
332
13
374
14
431
15
482
16
Resistance and Reactance Cable For Calculation Reference Used For Generator, Incoming Distribution board APPENDIX-C
Resistance, Reactance and Current Carrying Capacity of Cable
(Copper Conductor, XLPE insulated, Copper Tape Shielded, Rounded Aluminium Wire Armoured, PVC Sheathed, Comply to IEC standard 60502-1) XLPE/AWA/PVC 1x(25-630) mm² 8.7/15 (17.5) kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal) Current Carrying Capacities AC Resistance DC Resistance Reactance at at 90 °C at 20 °C 50 Hz (Ω/km) In air at 30 oC Underground (Ω/km) (Ω/km) (Amp) at 20 oC(Amp)
Conductor S.C Current @ 1 second (kA)
AdJust Table (In Air)
No
No. Core and Cross Sectional area
1
1.5
-
-
-
-
-
-
-
1
2
2.5
-
-
-
-
-
-
-
2
3
4
-
-
-
-
-
-
-
3
4
6
-
-
-
-
-
-
-
4
5
10
-
-
-
-
-
-
-
5
6
16
-
-
-
-
-
-
-
6
7
25
0.9270
0.1560
0.7270
163
140
3.5
163
7
8
35
0.6690
0.1480
0.5240
198
166
4.5
198
8
9
50
0.4940
0.1420
0.3870
238
196
7.0
238
9
10
70
0.3430
0.1330
0.2680
296
239
9.8
296
10
11
95
0.2470
0.1280
0.1930
361
285
13.3
361
11
12
120
0.1960
0.1240
0.1530
417
323
16.9
417
12
13
150
0.1590
0.1200
0.1240
473
361
21.1
473
13
14
185
0.1272
0.1150
0.0991
543
406
26.0
543
14
15
240
0.0972
0.1110
0.0754
641
469
33.8
641
15
16
300
0.0779
0.1070
0.0601
735
526
42.3
735
16
17
400
0.0614
0.1040
0.0470
845
590
56.4
845
17
18
50
0.0482
0.1010
0.0366
940
655
70.5
940
18
19
630
0.0376
0.0970
0.0283
1080
740
88.8
1080
19
Resistance and Reactance Cable For Calculation Reference Used For Generator, Incoming Distribution board APPENDIX-C
Resistance, Reactance and Current Carrying Capacity of Cable
(Copper Conductor, XLPE insulated, Copper Tape Shielded, Galvanized Flat Steel Wire Armoured, Galvanized Steel Tape Binding, PVC Sheathed, Comply to IEC standard 60502-1) XLPE/FSWA/PVC 3x(25-630) mm² 8.7/15 (17.5) kV, Taken from Approved Manufacture List (Sumi Indo Kabel or equal)
No
No. Core and Cross Sectional area
AC Resistance DC Resistance Reactance at at 90 °C at 20 °C 50 Hz (Ω/km) (Ω/km) (Ω/km)
Current Carrying Capacities
Conductor S.C Current @ 1 second (kA)
AdJust Table (In Air)
AC Resistance DC Resistance Reactance at at 90 °C at 20 °C 50 Hz (Ω/km) In air at 30 oC Underground (Ω/km) (Ω/km) (Amp) at 20 oC(Amp)
Conductor S.C Current @ 1 second (kA)
AdJust Table (In Air)
No
No. Core and Cross Sectional area
1
1.5
-
-
-
-
-
-
-
1
2
2.5
-
-
-
-
-
-
-
2
3
4
-
-
-
-
-
-
-
3
4
6
-
-
-
-
-
-
-
4
5
10
-
-
-
-
-
-
-
5
6
16
-
-
-
-
-
-
-
6
7
25
0.9270
0.1300
0.7270
143
129
3.5
143
7
8
35
0.6690
0.1230
0.5240
172
154
4.5
172
8
9
50
0.4940
0.1180
0.3870
205
181
7.0
205
9
10
70
0.3430
0.1110
0.2680
253
220
9.8
253
10
11
95
0.2470
0.1050
0.1930
307
263
13.3
307
11
12
120
0.1970
0.1020
0.1530
352
298
16.9
352
12
13
150
0.1600
0.0980
0.1240
397
332
21.1
397
13
14
185
0.1281
0.0950
0.0991
453
374
26.0
453
14
15
240
0.0984
0.0920
0.0754
529
431
33.8
529
15
16
300
0.0799
0.0890
0.0601
599
482
42.3
599
16
erence
AdJust Table (Underground)
-
1
-
2
-
3
-
4
-
5
-
6
140
7
166
8
196
9
239
10
285
11
323
12
361
13
406
14
469
15
526
16
590
17
655
18
740
19
erence
AdJust Table (Underground)
AdJust Table (Underground)
-
1
-
2
-
3
-
4
-
5
-
6
129
7
154
8
181
9
220
10
263
11
298
12
332
13
374
14
431
15
482
16
PT. TRIPATRA ENGINEERS & CONSTRUCTORS
: : :
Project Client Job No
PASE B FIELD DEVELOPMENT PROJECT Mobil Pase INC 9350
CABLE SIZING CALCULATION NO.
CABLE ROUTE
CABLE NO. FROM
ESTIMATE LENGTH LENGTH
CAPACITY TO
(Kw)
(KVA)
(m)
(feet)
VOLTAGE
PF
(V)
DESIGN CURRENT
CABLE SIZE
(A)
Sq.mm
CABLE GLAN SOURCE END
PASE B 1 LBS - 10 - 13 001A - P1 11 KV SWGR. PSG-10-13-001
LBS - 10 - 13 001A
400
500
5875
19274.94
11000
0.8
26.24 Err:504
TMC 7247 (2 1/2") or Equal
2 LBS - 10 - 13 001B - P1 11 KV SWGR. PSG-10-13-001
LBS - 10 - 13 001B
400
500
5875
19274.94
11000
0.8
26.24
TMC 7247 (2 1/2") or Equal
3 PXF-10-13-001A - P1
11 KV LBS - 10 - 13 001A at Pase B
PXF-10-13-001A
400
500
10
32.81
11000
0.8
26.24
TMC 7247 (2 1/2") or Equal
4 PXF-10-13-001B - P
11 KV LBS - 10 - 13 001B at Pase B
PXF-10-13-001B
400
500
10
32.81
11000
0.8
26.24
TMC 7247 (2 1/2") or Equal
5 CP-10-13-002A - P
400V MCC PMC-10-13-001A
Cathodic protetion
11
14
100
328.08
400
0.8
20.19
TMC 285 (3/4) or Equal
6 CP-10-13-002A - P
400V MCC PMC-10-13-001B
Cathodic protetion
11
14
100
328.08
400
0.8
20.19
TMC 285 (3/4) or Equal
V - 1303A Air Dryer Package
3.2
4
80
262.47
400
0.8
5.77
TMC 285 (3/4) or Equal
7 V - 1303A - P
400V MCC PMC-10-13-001A
8 V - 1303B - P
400V MCC PMC-10-13-001B
V - 1303B Air Dryer Package
3.2
4
85
278.87
400
0.8
5.77
TMC 285 (3/4) or Equal
9 V - 1301A - P
400V MCC PMC-10-13-001A
V - 1301A Motor Air Compressor
15
17
86
282.15
400
0.8
24.88
TMC 285 (3/4) or Equal
10 V - 1301B - P
400V MCC PMC-10-13-001B
V - 1101B Motor Air Compressor
15
17
185
606.96
400
0.8
24.88
TMC 285 (3/4) or Equal
TR - 10 - 13 - 002 Lighting Trafo 400/240V
20
25
10
32.81
400
0.8
36.08
TMC 4140 (1 1/4") or Equal
11 TR - 10 - 13 - 002 - P
400V MCC PMC-11805C
12 LDP - 10 - 13 - 002 - P
Transformer 400/240V
LDP - 10 - 13 - 002 Linghting Panel
20
25
10
32.81
400
0.8
36.08
TMC 4140 (1 1/4") or Equal
13 TP - 10 - 13 - 002 - P1
400V MCC PMC-11805C
TP - 10 - 13 - 002 Transfer Panel
10
13
15
49.21
400
0.8
18.04
TMC 285 (3/4) or Equal
14 TP - 10 - 13 - 002 - P2
400V MCC PMC-11805D
TP - 10 - 13 - 002 Transfer Panel
10
13
15
49.21
400
0.8
18.04
TMC 285 (3/4) or Equal
400V MCC PMC-11805D
W/O - 10 - 13 - 002 - Welding Outlet
30
38
85
278.87
400
0.8
54.13
TMC 4140 (1 1/4") or Equal
1 LBS - 11805A - P
11 KV SWGR. PSG-10-13-001
LBS - 11805A at SLS D
400
500
55
168
11000
0.8
26.24 Err:504
TMC 7247 (2 1/2") or Equal
2 LBS - 11805B- P
11 KV SWGR. PSG-10-13-001
LBS - 11805B at SLS D
400
500
50
152
11000
0.8
26.24
TMC 7247 (2 1/2") or Equal
3 LBS - 11805C - P1
11 KV SWGR. PSG-10-13-001
LBS - 11805C at SLS D
400
500
40
122
11000
0.8
26.24
TMC 7247 (2 1/2") or Equal
4 LBS - 11805D - P1
11 KV SWGR. PSG-10-13-001
LBS - 11805D at SLS D
400
500
43
131
11000
0.8
26.24
TMC 7247 (2 1/2") or Equal
5 PXF-11805C - P1
11 KV LBS - 10 - 13 001A at Pase B
PXF-11805C
400
500
10
30
11000
0.8
26.24
TMC 7247 (2 1/2") or Equal
6 PXF-11805D - P1
11 KV LBS - 10 - 13 001B at Pase B
PXF-11805D
400
500
10
30
11000
0.8
26.24
TMC 7247 (2 1/2") or Equal
15 W/O - 10 - 13 - 002 - P
SLS D
7 V - 1103A - P
400V MCC PMC-11805C
V - 1103A Air Dryer Package
3.2
4
195
594
400
0.8
5.77
TMC 285 (3/4) or Equal
8 V - 1103B - P
400V MCC PMC-11805D
V - 1103B Air Dryer Package
3.2
4
190
579
400
0.8
5.77
TMC 285 (3/4) or Equal
9 V - 1101A - P
400V MCC PMC-11805C
V - 1101A Motor Air Compressor
15
17
190
579
400
0.8
24.88
TMC 285 (3/4) or Equal
V - 1101B Motor Air Compressor
15
17
185
564
400
0.8
24.88
TMC 285 (3/4) or Equal
10 V - 1101B - P
400V MCC PMC-11805D
11 V - 1113A - P
400V MCC PMC-11805C
V - 1113A Motor KO Drum
11
14
210
640
400
0.8
20.19
TMC 3112 (1") or Equal
12 V - 1113B - P
400V MCC PMC-11805D
V - 1113B Motor KO Drum
11
14
212
646
400
0.8
20.19
TMC 3112 (1") or Equal
13 TR - 10 - 13 - 001 - P
400V MCC PMC-11805C
TR - 10 - 13 - 001 Lighting Trafo 400/240V
20
25
12
37
400
0.8
36.08
TMC 4140 (1 1/4") or Equal
LDP - 10 - 13 - 001 Linghting Panel
20
25
10
30
400
0.8
36.08
TMC 4140 (1 1/4") or Equal
TP - 10 - 13 - 001 Transfer Panel
10
13
22
67
400
0.8
18.04
TMC 285 (3/4) or Equal
14 LDP - 10 - 13 - 001 - P 15 TP - 10 - 13 - 001 - P1
Electrical Cable Sizing
Transformer 400/240V 400V MCC PMC-11805C
Pase B Field Development Project
Page 499 of 522
Project Client Job No
: : :
PASE B FIELD DEVELOPMENT PROJECT Mobil Pase INC 9350
CABLE SIZING CALCULATION NO.
CABLE ROUTE
CABLE NO. FROM
16 TP - 10 - 13 - 001 - P2 17 W/O - 10 - 13 - 001 - P
Electrical Cable Sizing
400V MCC PMC-11805D 400V MCC PMC-11805D
ESTIMATE LENGTH LENGTH
CAPACITY TO
VOLTAGE
PF
DESIGN CURRENT
CABLE SIZE
(A)
Sq.mm
CABLE GLAN SOURCE END
(Kw)
(KVA)
(m)
(feet)
(V)
TP - 10 - 13 - 001 Transfer Panel
10
13
21
64
400
0.8
18.04
TMC 285 (3/4) or Equal
W/O - 10 - 13 - 001 - Welding Outlet
30
38
190
579
400
0.8
54.13
TMC 4140 (1 1/4") or Equal
Pase B Field Development Project
Page 500 of 522
Err:504
SIZING CALCULATION CABLE GLAND
CABLE LUG LOAD END
Err:504
Err:504
Electrical Cable Sizing
Qty
Err:504
Size
Err:504
LOCK NUT Qty
Err:504
CABLE AMPACITY
TABEL
Size
Err:504
INC
Err:504
(0.8*A)
###
Err:504
(A)
Err:504
R
X
ohm per
ohm per
VOLTAGE DROP (%)
1000 ft
1000 ft
#REF!
Err:504
Err:504
Err:504
8
2
###
#VALUE!
#VALUE!
8
2
###
#VALUE!
#VALUE!
8
2
###
#VALUE!
#VALUE!
8
2
2
###
#VALUE!
#VALUE!
8
2
2
###
#VALUE!
#VALUE!
8
2
###
#VALUE!
#VALUE!
8
2
###
#VALUE!
#VALUE!
8
2
2
###
#VALUE!
#VALUE!
8
2
3
###
#VALUE!
#VALUE!
8
2
1
###
#VALUE!
#VALUE!
2
1
###
#VALUE!
#VALUE!
2
###
#VALUE!
#VALUE!
2
###
#VALUE!
#VALUE!
2
###
#VALUE!
#VALUE!
1
###
Err:504
1
###
#VALUE!
2
1
###
#VALUE!
#VALUE!
2
1
###
#VALUE!
#VALUE!
2
1
###
#VALUE!
#VALUE!
8
2
1
###
#VALUE!
#VALUE!
8
2
###
#VALUE!
#VALUE!
8
2
###
#VALUE!
#VALUE!
8
2
3
###
#VALUE!
#VALUE!
8
2
3
###
#VALUE!
#VALUE!
8
2
3
###
#VALUE!
#VALUE!
8
2
3
###
#VALUE!
#VALUE!
8
2
1
###
#VALUE!
#VALUE!
8
2
1
###
#VALUE!
#VALUE!
8
2
###
#VALUE!
#VALUE!
Err:504
Err:504
Err:504
Err:504
Err:504
Pase B Field Development Project
Err:504
Err:504
Err:504
Err:504
Page 501 of 522
Err:504
SIZING CALCULATION CABLE GLAND
CABLE LUG LOAD END
Electrical Cable Sizing
Qty
Size
LOCK NUT Qty
8
2
8
2
CABLE AMPACITY
TABEL
Size
INC 2
Pase B Field Development Project
(0.8*A)
(A)
R
X
ohm per
ohm per
VOLTAGE DROP (%)
1000 ft
1000 ft
#REF!
###
#VALUE!
#VALUE!
###
#VALUE!
#VALUE!
Page 502 of 522
APPENDIX-C Derating Factors (Ambient temperature factor, grouping factors) 1). Underground Installation (MV Cable)
2). Above ground Installation (in
a.) Table A.52-15 (52-D2) of IEC 364-5-52
b.) Sumi Indo Kabel MV Product Catalogue
a.) Table A.52-14 (52-D1) of IEC 364-5-52
Correction factors (kg1) for ambient ground temperatures other than 20 °C, to be applied to the current-carrying capacities for cables in the ground
Correction factors for depth of laying for Direct buried Three-core cables
b.) Table Installation Method in Table 52-B2
Correction factors (kg1) for ambient air temperatures other than 30 °C, to be applied to the current-carrying capacities for cables in the air
Depth of Laying (m) Insulation Ground temperature (oC)
Derating Factor
0.5
0.6
0.8
1
1.25
1
1.04
1.03
1
0.98
0.96
0.95
Insulation
Air temperature (oC)
PVC
XLPE and EPR
10
1.22
1.15
15
1.17
1.12
20
1.12
1.08
PVC
XLPE and EPR
10
1.1
1.07
15
1.05
1.04
25
0.95
0.96
30
0.89
0.93
c.) Table A.52-16 (52-D3) of IEC 364-5-52
25
1.06
1.04
35
0.84
0.89
Correction factors for soil thermal resistivities for Direct buried Three-core cables
35
0.94
0.96
40
0.77
0.85
40
0.87
0.91
45
0.71
0.8
45
0.79
0.87
50
0.63
0.76
50
0.71
0.82
55
0.55
0.71
55
0.61
0.76
60
0.45
0.65
60
0.5
0.71
65
-
0.6
65
-
0.65
70
-
0.53
70
-
0.58
75
-
0.46
75
-
0.5
80
-
0.38
80
-
0.41
85
-
90
-
95
-
Correction factors, Kg4 (750mm depth of trench cable) =
1.01
Values of soila thermal resistivity (K.m/W)
Derating Factor
1
1.5
2
2..5
3
1.18
1.1
1.05
1
0.96
Correction factors, Kg3 (1.2 K.W/m soil thermal resistivity) =
1.14
d.) Table A.52-18 (52-E2) of IEC 364-5-52 Correction factors (kg2) for more than one circuit, cables laid directly in the ground Installation Method D in Tables 52-C1 to 52-C4 (Single or multicore cables)
Number of circuits
Cable to cable clearance (a)* Nil One cable (cables 0.125 m diameter touching)
0.25 m
0.5 m
Perforated trays
31
(note 3)
Vertical perforated
31
trays (note 4)
Ladder, supports,
32
cleats, etc.
33
(note 4)
34
Correction factor, Ka2 (worst case, nine or more Notes:
1.
Correction factors , Kg1 ( 20 °C ground temperature assumed) =
0.89
2
0.75
0.8
0.85
0.9
0.9
3
0.65
0.7
0.75
0.8
0.85
4
0.60
0.60
0.70
0.75
0.80
5
0.55
0.55
0.65
0.70
0.80
6
0.50
0.55
0.60
0.70
0.80
Correction factors , Ka1 ( 40 °C air temperature) =
3. 4.
Above ground total correction Factor, Kat = Ka1 x Ka2 =
Total Correction factors, Kg2 (10 circuits laid directly in the ground) =
Underground cable total Correction Factor, Kgt = Kg1 x Kg2 x Kg3 x Kg4 =
0.56
2.
0.91
0.55
0.60
APPENDIX-C
Ambient temperature factor, grouping factors) 2). Above ground Installation (in free air) b.) Table A.52-20 (52-E4) of IEC 364-5-52 Number of Cables Installation Method in Table 52-B2
Number of Trays
1
2
3
4
6
9
1
1.00
0.88
0.82
0.79
0.76
0.73
2
1.00
0.87
0.80
0.77
0.73
0.68
3
1.00
0.86
0.79
0.76
0.71
0.66
1
1.00
1.00
0.98
0.95
0.91
-
2
1.00
0.99
0.96
0.92
0.87
-
3
1.00
0.98
0.95
0.91
0.85
-
1
1.00
0.80
0.82
0.78
0.73
0.72
2
1.00
0.88
0.81
0.76
0.71
0.70
1
1.00
0.91
0.89
0.88
0.87
-
2
1.00
0.91
0.88
0.87
0.85
-
1
1.00
0.87
0.82
0.80
0.79
0.78
2
1.00
0.86
0.80
0.78
0.76
0.73
3
1.00
0.85
0.79
0.76
0.73
0.70
1
1.00
1.00
1.00
1.00
1.00
-
2
1.00
0.99
0.98
0.97
0.96
-
3
1.00
0.98
0.97
0.96
0.93
-
Correction factor, Ka2 (worst case, nine or more cable on tray with up to three level superimposed trays) =
Ka2-1
Ka2-2
0.66
Value given are averages for the cable types and range of conductor sizes considered in Tables 52-B7 to 52-B12. The spread in values is generally less than ± 7.5%.
Factors apply to single layer groups of cables as shown above and do NOT apply when cables are installed in more than one layer touching each other. Values for such lower and must ve determined by appropriate method.installation may be significantly Values are given for a vertical spacing between trays of 300 mm. For closer vertical spacing the factors should be reduced. Values are given for a horizontal spacing between trays of 225 mm with trays mounted back to back. For closer spacing the factors should be reduced.
APPENDIX-C Derating Factors (Ambient temperature factor, grouping fcators) 1). Underground Installation
2). Above ground Installation (in free air)
Table 52-D2 of IEC 364-5-523
Table 52-D1 of IEC 364-5-523
Correction factors (kg1) for ambient ground temperatures other than 20 °C, to be applied to the current-carrying capacities for cables in the ground
PVC
10 15
Installation Method in Table 52-B2
Correction factors (kg1) for ambient air temperatures other than 30 °C, to be applied to the current-carrying capacities for cables in the air
Insulation
Ground temperature (oC)
TABLE A.52-20 (52-E4) of IEC 364-5-523
Insulation
Unperforated
Number of Cables Number of Trays
1
2
3
4
1
0.95
0.85
0.80
0.75
2
0.95
0.85
0.75
0.75
3
0.95
0.85
0.75
0.70
1 2
1.00 0.95
0.95 0.95
0.95 0.90
0.95 0.90
XLPE and EPR
Ground temperature (oC)
PVC
XLPE and EPR
Trays
1.1 1.05
1.07 1.04
10 15
1.22 1.17
1.15 1.12
(Note 3)
25
0.95
0.96
20
1.12
1.08
3
0.95
0.95
0.90
0.90
30
0.89
0.93
25
1.06
1.04
1
1.00
0.90
0.80
0.80
35
0.84
0.89
35
0.94
0.96
Perforated
2
1.00
0.85
0.80
0.75
40
0.77
0.85
40
0.87
0.91
Trays
3
1.00
0.85
0.80
0.75
45
0.71
0.8
45
0.79
0.87
(Note 3)
1
1.00
1.00
1.00
0.95
50
0.63
0.76
50
0.71
0.82
2
1.00
1.00
0.95
0.90
55
0.55
0.71
55
0.61
0.76
3
1.00
1.00
0.95
0.90
60
0.45
0.65
60
0.5
0.71
Vertical
1
1.00
0.90
0.80
0.75
65
-
0.6
65
-
0.65
Perforated
2
1.00
0.90
0.80
0.75
70
-
0.53
70
-
0.58
75
-
0.46
75
-
0.5
1
1.00
0.90
0.90
0.90
80
-
0.38
80
-
0.41
2
1.00
0.90
0.90
0.85
85
-
(Note 4)
90
-
Ladder
1
1.00
0.85
0.80
0.80
95
-
Support,
0.85
0.80
0.80
0.85 1.00 1.00 1.00
0.80 1.00 1.00 0.95
0.75 1.00 0.95 0.95
Correction factors , Kg1 ( 20 °C ground temperature assumed) =
Correction factors , Ka1 ( 40 °C ground temperature) =
1
H
J
K
Trays
Cleats, Etc. (Note 3)
0.91
2 L
3 1 2 3
1.00 1.00 1.00 1.00
TABLE 52-E2 of IEC 364-5-523 Correction factors (kg2) for more than one circuit, cables laid directly in the ground Installation Method D in Tables 52-C1 to 52-C4 (Single or multicore cables)
Correction factor, Ka2-3 = Ka2-1 x ka2-2= Notes:
0,75 x 0,8 =
0.6
1.
Value given are averages for the cable types and range of conductor sizes considered in Tables 52-B7 to 52-B12. The spre generally less than ± 7.5%.
2
Factors apply to single layer groups of cables as shown above and do NOT apply when cables are installed in more than on touching each other. Values for such lower and must ve determined by appropriate method.installation may be significantly
Cable to cable clearance (a)* Number of circuits
Nil (cables touching)
One cable diameter
0.125 m
0.25 m
0.5 m
2
0.75
0.8
0.85
0.9
0.9
3
Values are given for a vertical spacing between trays of 300 mm. For closer vertical spacing the factors should be reduced.
3
0.65
0.7
0.75
0.8
0.85
4
4
0.60
0.60
0.70
0.75
0.80
Values are given for a horizontal spacing between trays of 225 mm with trays mounted back to back. For closer spacing the be reduced.
5
0.55
0.55
0.65
0.70
0.80
6
0.50
0.55
0.60
0.70
0.80
Total Correction factors, Kgt =
0.60
( Assumptions 4 number of circuits, and one cable diameter cable to cable clearance)
Underground cable total Correction Factor, Kgt = Kg1 x Kg2 =
0.6
Above ground total correction Factor, Kat = Ka1 x Ka2-3 =
0.55
ables 6
9
0.70
0.70
0.70
0.65
0.65
0.60
0.90 0.85
-
0.85
-
0.75
0.75
0.75
0.70
0.70
0.65
0.90
-
0.85
-
0.85
-
0.75
0.70
0.70
0.70
Ka2-2
0.85 0.85
-
0.80
0.80
0.75
0.75
0.75 1.00 0.95 0.95
0.70 -
Ka2-1
les 52-B7 to 52-B12. The spread in values is
es are installed in more than one layer stallation may be significantly
he factors should be reduced.
o back. For closer spacing the factors should
APPENDIX-D K Constanta for XLPE Cable Table 43A of IEC 60364-4-43 - Values of k fo Phase Conductor
PVC
PVC
≤ 300 mm2
> 300 mm2
EPR / XLPE
Rubber
Mineral
60 oC With PVC
Initial Temperature oC
70
Final Temperature oC
160
70
90
60
70
140
250
200
160
Material of Conductor : Copper
115
103
143
141
115 *
Aluminium
76
68
94
93
-
115
-
-
-
-
Tin-soldered joints in copper conductors
* This value shall be used for bare cables exposed to touch
APPENDIX-D nstanta for XLPE Cable
C 60364-4-43 - Values of k fo Phase Conductor
Mineral
Bare 105 250
135 -
APPENDIX-E MINIMUM CABLE SIZE CHART BASED ON VACUUM CONTACTOR AND HRC FUSE SELECTION (For 6600 (a) Cable Data
(b) Minimum cable allowed based on Fuse Let-Through Energy (I2t) Value Cable LetThrough Energy
Cable Size (mm2)
Motor Full Load Current Motor Power Motor Rating in Amp @ Factor at (kW) Voltage (V) = Steady State 6600 V
Cable Constanta (k)
(S2k2)
Motor Efficiency
143
A2S
25
143
1.28E+07
160
17.54
0.84
0.95
35
143
2.51E+07
200
21.92
0.84
0.95
50
143
5.11E+07
250
27.74
0.83
0.95
70
143
1.00E+08
280
30.69
0.84
0.95
90
143
1.85E+08
315
34.17
0.84
0.96
120
143
2.94E+08
400
41.42
0.88
0.96
150
143
4.60E+08
500
51.24
0.88
0.97
185
143
7.00E+08
800
81.98
0.88
0.97
240
143
1.18E+09
1120
115.97
0.88
0.96
300
143
1.84E+09
1250
127.98
0.89
0.96
400
143
3.27E+09
1800
184.29
0.89
0.96
500
143
5.11E+09
3150
319.19
0.89
0.97
630
143
8.12E+09
3350
335.68
0.90
0.97
2 x 120
143
5.89E+09
4000
396.41
0.91
0.97
2 x 150
143
9.20E+09
2 x 185
143
1.40E+09
Notes :
1) Fuse characteristic is based on K81 type used for up to 45 kA Isc at 6.6 kV applications. 2) Fuse Let-through Energy shall be less than Cable Let-through Energy. 3) To obtain minimum cable cross-section area for 3150 kW motor and larger, if the fuse rating is not available, the short circuit wi shall be determined based motor protection tripping time or respective Switchgear short circuit withstand capability. 4) Fuse sizes are shown indicative only, and are to be determined by Switchgear Manufacturer for suitability with the related equip For this calculation purpose, the cut-off level is determined using data for GEC Alstom General / Motor HV HRC Type K81 fuse assuming a maximum run-up time of 15 seconds and up to 4 starts per hour.
APPENDIX-E UUM CONTACTOR AND HRC FUSE SELECTION (For 6600 V Motor Feeders)
nimum cable allowed based on Fuse Let-Through Energy (I2t) Value
Fuse Rating
Fuse LetThrough (I2t)
Min. Cable Size Allowed (mm2)
50
2.10E+05
25
50
2.10E+05
25
63
2.40E+05
25
63
2.40E+05
25
80
4.15E+05
25
80
4.15E+05
25
100
5.15E+05
25
200
9.20E+05
25
250
1.77E+06
25
250
1.77E+06
25
315
2.23E+06
25
N/A
N/A
(Note-3)
N/A
N/A
(Note-3)
N/A
N/A
(Note-3)
50 kW motor and larger, if the fuse rating is not available, the short circuit withstand capability of cable g time or respective Switchgear short circuit withstand capability. e determined by Switchgear Manufacturer for suitability with the related equipment. ermined using data for GEC Alstom General / Motor HV HRC Type K81 fuse links,
APPENDIX-F MINIMUM CABLE SIZE CHART BASED ON MOTOR PROTECTION AND MCCB SELECTION (For 400 V (a) Cable Data
(b) Minimum cable allowed based on Motor Feeder Breaking Device Let-Throu Cable LetThrough Energy
Cable Size (mm2)
Motor Full Load Current Motor Power Motor Rating in Amp @ Factor at (kW) Voltage (V) = Steady State 400 V
Cable Constanta (k)
(S2k2)
Motor Efficiency
143
A2S
2.5
143
1.28E+05
0.37
1.13
0.74
0.64
4
143
3.27E+05
0.55
1.42
0.79
0.71
6
143
7.36E+05
0.75
1.85
0.77
0.76
10
143
2.04E+06
1.1
2.61
0.77
0.79
16
143
5.23E+06
1.5
3.43
0.78
0.81
25
143
1.28E+07
2.2
4.55
0.84
0.83
35
143
2.51E+07
3
6.06
0.84
0.85
50
143
5.11E+07
4
7.99
0.84
0.86
70
143
1.00E+08
5.5
10.86
0.84
0.87
90
143
1.85E+08
7.5
14.14
0.86
0.89
120
143
2.94E+08
11
21.78
0.81
0.90
150
143
4.60E+08
15
28.32
0.84
0.91
185
143
7.00E+08
18.5
34.55
0.84
0.92
240
143
1.18E+09
22
41.09
0.84
0.92
300
143
1.84E+09
30
56.10
0.83
0.93
37
67.64
0.84
0.94
45
80.28
0.87
0.93
55
97.17
0.86
0.95
75
132.50
0.86
0.95
90
157.17
0.87
0.95
110
190.10
0.87
0.96
132
228.12
0.87
0.96
150
259.23
0.87
0.96
Notes :
1) MCCB characteristic is based on Merlin Gerin - NS-L type used for up to 100 kA Isc at 400 V applications. 2) MCCB Let-through Energy shall be less than Cable Let-through Energy. 3) Motor ratings up to 5.5 kW will use GV2-L type of MCP. 4) Motor ratings from 5.5 kW p to 200 kW will use MCCB NS-L type. 5) MCP and MCCB sizes are shown indicatively only, and are to be determined by the switchgear manufacturer for suitability with
during detailed design.
APPENDIX-F MOTOR PROTECTION AND MCCB SELECTION (For 400 V Motor Feeders)
nimum cable allowed based on Motor Feeder Breaking Device Let-Through Energy
MCP / MCCB Type
MCP / MCCB Let-Through (I2t)
Min. Cable Size Allowed (mm2)
GV2-L
7.00E+03
2.5
GV2-L
7.00E+03
2.5
GV2-L
7.00E+03
2.5
GV2-L
1.70E+04
2.5
GV2-L
3.00E+04
2.5
GV2-L
5.00E+04
2.5
GV2-L
7.50E+04
2.5
GV2-L
7.50E+04
2.5
NS100
5.00E+05
6
NS100
5.00E+05
6
NS100
5.00E+05
6
NS100
5.00E+05
6
NS100
5.00E+05
6
NS100
5.00E+05
6
NS100
5.00E+05
6
NS100
5.00E+05
6
NS160
6.00E+05
6
NS160
6.00E+05
6
NS250
8.00E+05
10
NS250
8.00E+05
10
NS250
8.00E+05
10
NS400
1.80E+06
10
NS630
3.50E+06
16
and are to be determined by the switchgear manufacturer for suitability with the related equipment
APPENDIX-G MINIMUM CABLE SIZE CHART BASED ON MCCB SELECTION (For 400 V Power Distribution F (a) Cable Data
(b) Min. cable allowed based on 400V Power Distribution Breaking Device LetCable LetThrough Energy
Cable Size (mm2)
Load Rating (kW)
Full Load Current in Amp @ Voltage (V) = 400 V
Load Power Factor at Steady State
Load Efficiency
Cable Constanta (k)
(S2k2)
143
A2S
2.5
143
1.28E+05
1.2
2.26
0.85
0.90
4
143
3.27E+05
1.5
2.83
0.85
0.90
6
143
7.36E+05
2.1
3.96
0.85
0.90
10
143
2.04E+06
2.8
5.28
0.85
0.90
16
143
5.23E+06
3.7
6.98
0.85
0.90
25
143
1.28E+07
4.8
9.06
0.85
0.90
35
143
2.51E+07
6.5
12.26
0.85
0.90
50
143
5.11E+07
9.3
17.55
0.85
0.90
70
143
1.00E+08
12.2
23.02
0.85
0.90
90
143
1.85E+08
15.4
29.06
0.85
0.90
120
143
2.94E+08
18
33.96
0.85
0.90
150
143
4.60E+08
23.8
44.91
0.85
0.90
185
143
7.00E+08
29.7
56.04
0.85
0.90
240
143
1.18E+09
35.5
66.98
0.85
0.90
300
143
1.84E+09
47.7
90.00
0.85
0.90
58.3
110.00
0.85
0.90
70
132.07
0.85
0.90
83.7
157.92
0.85
0.90
101.8
192.07
0.85
0.90
121.9
230.00
0.85
0.90
147.9
279.05
0.85
0.90
177.5
334.90
0.85
0.90
Notes :
1) MCCB characteristic is based on Merlin Gerin - NS-L type used for up to 100 kA Isc at 400 V applications. 2) MCCB Let-through Energy shall be less than Cable Let-through Energy. 3) Air Circuit Breaker will be utilized for 800 Amp load rating and larger. 4) MCCB sizes are shown indicatively only, and are to be determined by the switchgear manufacturer for suitability with the relate
APPENDIX-G ED ON MCCB SELECTION (For 400 V Power Distribution Feeders)
n. cable allowed based on 400V Power Distribution Breaking Device Let-Through Energy
MCB / MCCB Type
MCB / MCCB Let-Through (I2t)
Min. Cable Size Allowed (mm2)
C60N
0.00E+00
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
C60N
5.00E+05
6
NS160
6.00E+05
6
NS160
6.00E+05
6
NS160
6.00E+05
6
NS250
8.00E+05
6
NS250
8.00E+05
6
NS400
1.80E+06
10
NS400
1.80E+06
10
NS400
1.80E+06
10
NS400
1.80E+06
10
o be determined by the switchgear manufacturer for suitability with the related equipment during detailed design.