Casing Hardware
Module CF05
1 Initials
Guide Shoes
Guide Shoe - Cement Nose
2 Initials
Guide Shoe - Down Jet
Guide Shoe - Aluminium Nose
Float Shoes
Float Shoe Ball valve
3 Initials
Float Shoe Sure Seal with Down Jet
Float Shoes
FLOAT SHOE ALUMINIUM NOSE with FLAPPER VALVE and AUTOMATIC FILL-UP
4 Initials
FLOAT SHOE CEMENT NOSE with FLAPPER VALVE and AUTOMATIC FILL-UP
Float Collars
Float Collar - Ball Valve
Float Collar - Sure Seal
1-3 CASING JOINTS ABOVE SHOE REDUCE CONTAMINATION AROUND THE SHOE
5 Initials
Float Collar with insert Flapper Valve
Stab-in Shoes STINGER DRILL PIPE CONNECTION (SPECIFY SIZE)
6 Initials
FLOAT SHOE STAB-IN WITH BALL VALVE
Stab-in Collars FLOAT COLLAR STAB-IN BALL VALVE
7 Initials
Why do we use stab-in equipment ? Reduce excess cement Avoid contamination Reduce job time
STAB-IN UNIT
8 Initials
FLEXIBLE LATCH PLUG
Uses of Two Stage Cementing Reduce possibility of breaking down a
weak formation
Minimise cement contamination Cost
REDUCES THE QUANTITY OF CEMENT 9 Initials
Regular Two Stage Cementing Sequence OPENING BOMB
DISPLACEMENT FLUID
FIRST STAGE SLURRY WITH EXCESS CEMENT
WASH AHEAD SPACER
FIRST STAGE DISPLACEMENT
10 Initials
OPENING BOMB SEATED IN STAGE COLLAR
Two Stage Cementing (continued)
FIRST STAGE EXCESS SLURRY
PORTS OPENED CEMENT BASKET 1500 psi
CIRCULATING THE UPPER SECTION FIRST STAGE CEMENTING SEQUENCE COMPLETED COMMENCEMENT OF SECOND STAGE COLLAR STAGE CLOSED
11 Initials
Three Stage Cementing Operation UPPER STAGE COLLAR OPENING BOMB STG 3
CLOSING PLUG STG 2 OPENING BOMB STG 2 FIRST STAGE FLEXIBLE PLUG
12 Initials
CLOSING PLUG STG 3
Baskets and Centralizers
Cementing Basket
13 Initials
Centralizer
Scratchers and Collars Rotating Scratcher
Model J10H Stop Collar
14 Initials
Reciprocal Scratcher
Model J5H Stop Collar
Plugs Separate fluids Wiping casing Surface indication of placement
15 Initials
Cement Plugs
Top Plug (Solid)
16 Initials
Bottom Plug (Hollow Inside)