WBS Code 1

Task Name Duration Project

1.1

37 days

Analysis

15 days

Bidding

20 days

Approvals Submissions Planning Working Drawings Final Estimates Team Selection Design Architecture

2 days 43 days 43 days

Architectural Layout Plan

14 days

Architectural Design Structure Structure Layout Plan Structure Design

17 days

Construction

336 days

Surveying & Marking

21 days

1.3.1

Diversions

14 days

1.3.2

Removal of Trees Site Mobilization

1.1.1.1 1.1.1.2 1.1.1.3 1.1.2 1.1.3 1.1.3.1 1.1.3.2 1.1.3.3 1.2 1.2.1 1.2.1.1 1.2.1.2 1.2.2 1.2.2.1 1.2.2.2 1.3

1.3.3

22 days 20 days 1 day

-

Thu 1/16/20

Wed 2/12/20

3

Thu 2/13/20 Mon 2/17/20 Thu 4/16/20

Fri 2/14/20 Wed 4/15/20 Mon 6/15/20

4 5 6

Thu 4/16/20

Fri 5/15/20

6

Mon 5/18/20

Fri 6/12/20

8

Mon 6/15/20

Mon 6/15/20

9

Tue 6/16/20 Tue 6/16/20

Wed 9/2/20 Tue 7/28/20

1

Consultant

Tue 6/16/20

Fri 7/3/20

1

Consultant

Mon 7/6/20

Tue 7/28/20

13

Wed 7/29/20

Wed 9/2/20

Contractor,Project Manager Consultant,Project Manager Consultant,Project Manager

14

12 days

Consultant

Tue 8/18/20

Wed 9/2/20

16

Thu 9/3/20

Thu 12/16/21

11

Thu 9/3/20

Thu 10/1/20

11

Fri 10/2/20

Wed 10/21/20

19

Thu 10/22/20

Wed 11/4/20

20

Thu 11/5/20

Mon 11/23/20

21

Tue 11/24/20

Thu 12/10/20

22

Fri 12/11/20

Tue 12/29/20

23

Wed 12/30/20

Tue 1/19/21

24

Wed 1/20/21

Thu 1/28/21

25

Fri 1/29/21

Thu 3/11/21

Fri 1/29/21

Thu 2/11/21

26

Fri 2/12/21

Fri 3/5/21

28

Mon 3/8/21

Thu 3/11/21

29

Fri 3/12/21

Wed 4/21/21

27

Fri 3/12/21

Mon 3/22/21

27

Tue 3/23/21

Mon 4/12/21

32

10 days 13 days

Clearance and Preparation

15 days

1.3.7

Temporary Site Construction

7 days

1.3.8

Earthwork

30 days

Excavation

10 days

1.3.9.1

Foundation

16 days

1.3.9.2

Backfilling

4 days

1.3.10.1

Wed 1/15/20

Mon 8/17/20

1.3.6

Formwork

Fri 2/14/20

Wed 7/29/20

13 days

1.3.10

Mon 6/15/20

Consultant

Site Layout Plans

Retaining Walls

Predecessors

14 days

1.3.5

1.3.9.3

Finish

Thu 12/26/19

26 days

13 days

1.3.9

Consultant,Project Manager Consultant,Project Manager Consultant Contractor

57 days 31 days

Breaking of Existing Pavements

1.3.4

Start Thu 12/26/19 Thu 12/26/19

123 days

Contracts

1.1.1

Resource Names

Labor D,Project Manager,Labor E,Labor F Labor A,Labor B,Labor C,Labor D,Project Manager,Labor E Labor B,Labor D,Surveyor,Labor A Labor B,Labor D,Surveyor,Labor A Labor A,Labor B,Labor C,Labor D,Project Manager,Labor E Project Manager,Planner Labor A,Labor B,Labor C,Labor D,Project Manager,Labor E Labor A,Labor B,Labor C,Labor D,Project Manager,Labor E Labor A,Labor B,Labor C,Labor D,Project Manager,Labor E Labor A,Labor B,Labor C,Labor D,Project Manager,Labor E Labor E,Labor F,Labor G,Labor H,Project Manager

29 days 7 days 15 days

Labor G,Labor H,Labor E,Project Manager,Labor I Labor G,Labor

Reinforcement work

1.3.10.2 1.3.10.3 1.3.11

Concreting and Curing Drainage

7 days 31 days

Excavation

4 days

Dewatering

14 days

1.3.11.2

R.C.C pipes

6 days

1.3.11.3

Backfilling

7 days

1.3.11.1

1.3.11.4 1.3.12

Columns Placement Formwork

1.3.12.1

Reinforcement work

1.3.4.12.2

Concreting and Curing

1.3.12.3

1.3.13

1.3.14

Precast Slab

Slope Levelling

14 days

21 days

14 days

7 days

1.3.14.1

Sub base

11 days

1.3.14.2

Asphalt coating (Pavement)

1.3.14.4 1.3.14.5 1.3.15

Electrical fittings & Finishes Finishes Closure

5 days

14 days

21 days 22 days

Labor C,Labor D,Labor E,Labor F,Labor G[70%],Labor H,Project Manager,Labor I Labor C,Labor D,Labor E,Labor F,Labor G[70%],Labor H,Project Manager Labor A,Labor B,Labor C,Machine Labor,Project Manager Labor D,Labor E,Labor F,Project Manager Labor A,Labor B,Labor C,Project Manager Project Manager,Contractor

53 days

Tue 4/13/21

Wed 4/21/21

33

Thu 4/22/21

Thu 6/3/21

31

Thu 4/22/21

Tue 4/27/21

31

Wed 4/28/21

Mon 5/17/21

36

Tue 5/18/21

Tue 5/25/21

37

Wed 5/26/21

Thu 6/3/21

38

Fri 6/4/21

Wed 8/11/21

35

Fri 6/4/21

Wed 6/23/21

35

Thu 6/24/21

Thu 7/22/21

41

Fri 7/23/21

Wed 8/11/21

42

Thu 8/12/21

Fri 8/20/21

40

Mon 8/23/21

Thu 12/16/21

44

Mon 8/23/21

Mon 9/6/21

44

Tue 9/7/21

Tue 9/21/21

46

Wed 9/22/21

Tue 9/28/21

47

Wed 9/29/21

Mon 10/18/21

48

Tue 10/19/21

Tue 11/16/21

49

Thu 12/16/21

50

Tue 3/1/22

18

Wed 11/17/21 Fri 12/17/21

Contractor,Project Manager

Fri 12/17/21

Wed 1/19/22

18

14 days 7 days 7 days 15 days

Contractor Contractor

Thu 1/20/22 Thu 1/20/22 Mon 1/31/22 Wed 2/9/22

Tue 2/8/22 Fri 1/28/22 Tue 2/8/22 Tue 3/1/22

53 53 55 56

15 days

Contractor

Wed 2/9/22

Tue 3/1/22

56

1.3.16

Inspection

24 days

1.4 1.4.1 1.4.3 1.4.4

Documents Reports Bills Mainenance Solution and Services

1.4.4.1

Labor D,Labor E,Labor F,Project Manager Labor C,Labor D,Labor E,Labor F,Labor G,Labor H,Project Manager Labor D,Labor E,Labor F,Project Manager Labor A,Labor B,Labor C,Labor D,Machine Labor,Project Manager

84 days

11 days

Side walks

Labor E,Labor F,Labor G,Labor H,Project Manager Labor A,Labor B,Labor C,Labor D,Project Manager Labor E,Labor F,Labor G,Labor H,Labor I,Project Manager Labor B,Labor C,Labor D,Labor E,Labor F,Labor G,Labor H,Labor I,Machine Labor,Project Manager,Labor A

49 days

Backfilling

1.3.14.3

H,Labor E,Project Manager,Labor I Labor G,Labor H,Labor E,Project Manager,Labor I