GENERAL NOTES
ABBREVIATIONS
1. ALL DIMENSIONS ARE IN mm
25
24
2.ALL HEIGHTS ARE FROM F.F.L
23
3.BACK BOX INSTALLATION DETAIL SHALL BE REFERRED IN TYPICAL INSTALLATION DETAIL
246
FIN.CEILING = L+2550MM FIN.CEILING = L+2550MM
667
1133
1300
1484
1183
NETWORK SWITCH
6.FINAL LOCATION FOR FCU TO BE INLINE WITH COORDINATION DRAWING. (ATR-SPLL-VT(L6-L62)-0111)
CH+2400
24 25 YARD
25
KITCHEN
2
4
22
X
MASTER BATHROOM
REF 25
27
532
300
DT3
1300
25 DT3
L.1
1300 (2M1)
1300
1500
LIVING
(6M1)
ELEVATION -3
17
(6M1)
ELEVATION -5
2377
16
6M1
12
SHAVER
135.5 x 76.5 x 51
Z
03
SINGLE BOX
76.5 x 76.5 x 51
X
03
SINGLE BOX
76.5 x 76.5 x 51
X
22
DOUBLE BOX
76.5 x 136.5 x 51
Y
02
2 MODULE BOX
76.5 x 76.5 x 51
2M
05
4 MODULE BOX
76.5 x 136.8 x 51
4M
03
6 MODULE BOX
76.5 x 214.2 x 51
6M
02
76.5 x 76.5 x 51
X
09
ELB EQB
REV. NO
REV. NO
SHOP DRAWING NO
ATR-DT3-AR-DWG- 3092-02
R1
ATR-SPLL(MAX)-EL-DWG-GN-TYP-5001
R1
ATR-DT3-AR-DWG- 3619-02
R0
ATR/SPLL/AR/DWG/VT/L43 /0182
R0
ATR-DT3-AR-DWG- 3620-02
R0
ATR-SPLL(MAX)-EL-DWG-VT-L43-1333
R0
ATR-DT3-AR-DWG- 3621-02
R0
ATR-SPLL(MAX)-EL-DWG-VT-L43-1334
R0
ATR-DT3-AR-DWG- 5430
R0
ATR-SPLL(MAX)-LV-DWG-VT-L43-1335
R0
ATR-DT3-AR-DWG- 5431
R0
ATR/SPLL/GM/DWG/VT/(L6-L62) 0142
R0
ATR-DT3-AR-DWG- 5436
R0
ATR/SPLL/GM/DWG/VT/(L6-L62) 0111
R0
ATR-DT3-AR-DWG- 5438
R1
ATR-DT3-AR-DWG- 5456
R0
1230 832
13
1157
955
892
BEDROOM 2
PROJECT
MASTER BEDROOM
COLOMBO RESIDENTIAL TOWER COLOMBO, SRI LANKA
(6M)
2650
14
F1
LIVING
(6M1)
(2M1)
300
(2M1) (6M1)
300
300
DT2
(6M1)
ELEVATION 7 F1A
F1A
F1A
ELEVATION -6
L
F1A
CLIENT INDOCEAN DEVELOPERS (PVT) LIMITED DESIGN ARCHITECT SAFDIE ARCHITECTS, LLC. 100 PROPERZIE WAY SOMERVILLE, MA 02143-3740 USA T 617.629.2100 F 617.629.2406
150
(X)
300
9
1300
400
CH+240025
10
F1A
76.5 x 214.2 x 51
DESIGN DRAWING NO
F1
(4M)
DINING CORRIDOR AREA
DT3
DT2
300
(2M)
DT2
25
8
F1A
04
6 MODULE BOX
REFERENCE DRAWINGS
19a
15
29
4M1
SINGLE BOX
26a
CH+2400
LIVING
5
2M1
76.5 x 136.8 x 51
18
6
7
76.5 x 76.5 x 51
4 MODULE BOX
175
MAID ROOM
X
12
12
2 MODULE BOX
SOFFIT (HIGH LEVEL)
X
BATHROOM 3
400
FIN.CEILING = L+2550MM
19
CH+2550
BALCONY
1300
1300
1300
25
188
26
X
EQUAL TAG QTY
HOME AUTOMATION(BACK BOX )
DT2
SLIDING DOOR LOCATION TO BE FINALIZED .
DINING
MASTER BATHROOM
C4'
POWDER
A/P
SK1
ELEVATION -2
40
DT5
29
DINING
MAID W.C.
21
3 VDP
(6M1)
300
23
(2M1) (6M1)
(2M1)
ELEVATION -1
KED 300x450
SIZE
YARD/ MAIDS ROOM / KITCHEN
C4
20
LIVING(6M1)
300
1
(6M1)
1300
X
ATR-SPLL(MAX)-LV-DWG-VT-(L41-L57)-6679
ELECTRICAL/ELV(BACK BOX )
CH+2400
WM WH
DT6 (1100 SH) (1100 HT)
DW
CONSOLIDATION BOX
EX3
EX2
ELV
(2M)
LIVING/DINING/BED ROOMS/COMMON CORRIDOR
(X)
300
X
X
LIGHTING & POWER ATR-SPLL(MAX)-EL-DWG-VT-(L41-L57)-6677
(X)
(4M)
VDP
300
EX1
K
300
X
DT4
DT1 A/P
C1
D1 X
LIVING
(4M)
(2M)
DT1
50
28 C1
5. REFERRED DRAWINGS OF WIRING LAYOUT TO BE FOLLOWED.
CONSOLIDATION BOX
150X450 OPENING FOR LOUVER AT 100mm FROM FFL
A
4.EXACT LOCATIONS OF SHAVER SOCKET TO BE FOLLOWED AS PER ARCHITECTS TILE LAYOUT
500
1618
ELEVATION -08
ASSOCIATE ARCHITECT DESIGN TEAM 3 SINGAPORE T 658.499.7168 STRUCTURAL ENGINEER MR. PREDRAG EROR P.O. BOX 102803, DUBAI, UAE T 9714.3629234 F 9174.3629234
995
296
1272
405
FIN.CEILING = L+2400
405
2000 1050
636
2274
2500
MECH, ELECT, PLUMBING ENGINEER CKR CONSULTING ENGINEERS PVT. LTD. PO BOX 73889 DUBAI, UAE T +97143384277
1057
600
1103
1385
1105
G3
2200
F1
(2M)
LANDSCAPE ARCHITECT P LANDSCALE CO., LTD. 59/3 SOI SUKHUMVIT 39 SUKHUMVIT ROAD, KLONGTON NUA WATTANA, BANGKOK 10110 T. 662.261.3700.9
F1
LOCAL STRUCTURAL ENGINEER & SUPERVISION CONSULTANT DEEPAL WICKREMASINGHE ASSOCIATES NO. 377/2, Thalawathugoda Road, Hokandara South, Sri Lanka. T- +94 11 4402395
(2M)
ELEVATION -12
ELEVATION -13
ELEVATION -14
(4M1)
MASTER BEDROOM
(4M1)
(6M1)
(2M1)
(6M1)
MASTER BEDROOM
ISSUE NO.
ELEVATION -17
ELEVATION -16
ELEVATION -15
(2M1)
300
(2M1)
BEDROOM 2
300
(4M1)
150 450
BEDROOM 2
(4M1)
150
150
(6M1)
BEDROOM 2
150 450
TP 300
ELEVATION -10
DT3
F1
DT2
1300
1300
HS
ELEVATION -09
(4M)
(2M1)
F1
1300
(2M1)
W6
(Z)
1100
DT2
2100
2200
2200
F1
00 488 W9 200
808
222
1050
1165
232
W9
133
498
319
450
349
807
DATE
FOR APPROVAL
07.09.2017
1677 568
W9 1252 231 FIN.CEILING = L+2400MM
FIN.CEILING = L+2400MM
FIN.CEILING = L+2400MM
FIN.CEILING = L+2400MM
754
667
654
W9
1485
FIN.CEILING = L+2400
806
148
660
DESCRIPTION
780
CO-0RDINATION CERTIFICATE S. NO DISCIPLINE DATE
392
W8
SIGNATURE
EQM
1. 2. 3. 4.
(X)
C1
C1
150
ELEVATION -19
ELEVATION -18
526
218
ELEVATION -20
ELEVATION -21
150
844
DT1
500
1650
TP
M12
ELEVATION -27
ELEVATION -28
SECTION -29-29
DETAIL-A
ALTAIR Indocean Developers (Pvt) Ltd No: 121A, Sir James Peiris Mawatha Colombo 02 Approved Approved as Corrected Submit Specified Item Revise and Resubmit Rejected
LIVING
M12
ELEVATION -26a
1050
1300
1150
1733
F1
LIVING
ELEVATION -26
F
D
B
G
E
C
A
Sub Contractor
400
(2M1)
1300
HS 650
(X)
H
FIN.CEILING = L+2550MM
GA1A 1300
1500
1300 450
2100
2350
614
ELEVATION -25
DISTRIBUTION BOARD
DT9
DT6
ELEVATION -24
100mm x 60mm VERTICAL TRAY (FOR ELECTRICAL)
W3
(X) (X)
KEY PLAN
(X)
ADB TRUNKING 100mm x 50mm (FOR ELECTRICAL)
131 (Y)
DT6 (Y)
4nos 25Ø PVC Conduits
G3
(X)
ELEVATION -23
D1
Main Contractor
W9
413 FIN.CEILING = L+2400
(X)
ELEVATION -22
EQM
(X)
SK1
DT4
(X)
500
133 139 200
ELEVATION -19a
(X)
500
(X)
SK1
MASTER BATHROOM
DT6
(X)
(X)
C4
1150
DT5
1700
DT5
C1 (X)
G2
G2
(X) (X)(X)
DT5
450 600
1150
1700 1150
1300
1100
1100
W11
(X)
(X)
1300
(X) (X)
DT2
G2 2000
DT4
1150
G2
(X)
(Z)
(Z)
DT2
1300
DT3
2100
2200
(2M1)
1300
1300
DT2
C1
REF.
1150
(6M) (2M1)
3300
G3
DT2
ELEVATION -4
The review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Contractor is responsible for: Dimensions to be confirmed and correlated at the job site; information that pertains solely to the fabrication processes or to the means, methods, techniques, sequences, and the procedures of constructions; coordination of the Work of all trades; and for performing all work in a safe and satisfactory manner. Any approval from the Engineer/Consultant of submittals, materials and workmanship etc. shall not relieve the Contractor of his sole responsibility and obligation to comply with all requirements under the Contract.
DISCIPLINE
ELECTRICAL
DRAWING TITLE VERTICAL TOWER UNIT -G LEVEL -43 WALL CONDUIT INSTALLATION FOR ELECTRICAL AND ELV SYSTEMS
Detailed
Drawn
Udayashantha Kusum
Date
Date
Checked Approved Buddika
Date
Scale Size
Jayasuriya
1:50
A1
Date
07.09.2017 07.09.2017 07.09.2017 07.09.2017
Consultant/Engineer Reviewer Signature
MAXAIRE (PVT) LTD 110 , Isipathana Mawatha, Colombo 05. T : +94 11 2501370, 2501305, 4641477 F : +094 11 2589860 E :
[email protected]
Date
Drawing Number ATR-SPLL(MAX)-GM-DWG-VT-L43-6626 Status SHOP DRAWING
Rev. 0