Comments Resolution Sheet [ Crs ]: No. Qp Comments Contractor Response

  • Uploaded by: Daniyal Khursheed
  • 0
  • 0
  • February 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Comments Resolution Sheet [ Crs ]: No. Qp Comments Contractor Response as PDF for free.

More details

  • Words: 137,698
  • Pages: 172
Loading documents preview...
COMMENTS RESOLUTION SHEET   [ CRS ] CONTRACT NUMBER:  CONTRACT TITLE: 

GC16101100 

No. 

1.

2.

3.

4.

5.

3963 

EPIC FOR  REPLACEMENT OF OLD 3‐PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN 

QP EXTERNAL TRANSMITTAL REFERENCE :  DOCUMENT NUMBER:  DOCUMENT TITLE: 

QP PROJECT NUMBER 

EDD/GC16101100/EXT/TN/3945 

3963‐DGEN‐0‐04‐0001  Project Planning Package 

QP COMMENTS General comment related with P6 integrity: 1. 27 activities out of sequence 2. 5 activities, actual date > data dates 3. 21 activities have invalid relationships 4. 1 activity with schedule loop 5. And the others, please see your schedule log created from P6. Att 1.1, overall s curve. S curve still showing timeline till Feb 2019, please revise. PP item 10, page 7 of 12 detailed Tie-in schedule shall be submit at least 4 months before SD

DATE:

13‐11‐2018 

DOCUMENT REVISION:



CONTRACTOR RESPONSE 1. Noted & Incorporated

2. Noted & Incorporated 3. CPECC submit detailed Tie-in Schedule for JALM along Rev-D Planning Package & for FAHM, FAHN & FAHS in last week ofDec-18. See Attachment 3

Construction planned to be completed in July 2019, but the manpower histogram assign manpower until May 2019. Please clarify?

4. Until May-18 only construction activities including Commissioning are planned & As Built and Final Dossier are planned from 23-May-19 to 22-July19.

Page 3 of 12, item 1.0 1. Qatar diplomatic crisis is not a valid reason for the delay, since SD for Khatiyah sector has been completed and the rest can be planned accordingly. This issue shall be removed from Planning package. 2. Weather condition shall be removed from planning package. High humidity during summer is annual event in Qatar, Contractor shall plan accordingly for this matter. This issue shall be removed from planning package. 3. Clashes with underground facilities. It's contractor scope to do UG Survey as per App A, 4.2.1.1.1 of the contract. The statement that said this is beyond CPECC shall be removed from Planning package.

5. Noted & Incorporated.

6.

Put triangle with rev. no/letter on the content that has been change from the previous revision

6. Noted & Incorporated

7.

Precomm and comm weightage has been change from the previous rev (indvidual and phase). Please clarify?

7. Progress & weightage for Pre commissioning and commissioning retained same as per actual on 25-10-18

In the previous revision, Precomm and commissioning has actual progress from the documents (Preparation of plan and procedures for recommissioning). Why the weightage for those documents has been removed in the rev.C. Please clarify? Activity ID A3100-5, Jaleha shutdown windows is 2 to 23 March 2019. CPECC planned to have it in the last week (18 to 23 March 2019)? Please clarify? If any unexpecting event occur, we don't have any buffer time. Piping Fabrication for Jaleha and Fahahil seem not as main priority? Jaleha and Fahahil, especially piping for Shutdown tie in shall be assign as main priority to avoid delay during SD time.

8. Refer Sr. No. 7 response 

8.

9.

10.



Submit native CRS along with the revised document/drawing.  

9.  Refer Sr. No. 3 response 

. 10. Currently Piping fabrication for Jaleha & Fahahil degassing station in

progress at Medgulf & Dopet facility in Qatar for CS pipes & FBE coated pipes at Kuwait. CPECC continuing expediting the fabrication progress for Jaleha & Fahahil in order to deliver the material at site before Shutdown avoid the delay during SD time ongoing . 

 

PROJECT / CONTRACT REF.: 3963 / GC16101100 CONTRACT TITLE: -

EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN

Project Planning Package

China Petroleum Engineering & Construction Corporation Ding Guiping Ding Guiping

th

D

RE-ISSUED FOR CONSTRUCTION

Vivek / Taimoor

Zafar/WDH

th

C

RE-ISSUED FOR CONSTRUCTION

Vivek / Taimoor

Zafar/WDH

th

B

RE-ISSUED FOR CONSTRUCTION

Vivek

Zafar/WDH

Wang Xilin

th

26 Mar 2018

A

APPROVED FOR CONSTRUCTION

Vivek

Zafar/WDH

Wang Xilin

10th Aug

2

RE-ISSUED FOR APPROVAL

Vivek

Zafar/WDH

Wang Xilin

1

ISSUED FOR APPROVAL

Vivek

Wang Danghui

Wang Xilin

16 Mar

0

ISSUED FOR COMMENTS

Li Xiuwang

Zafar

Wang Xilin

DATE

REV. NO

REASON FOR REVISION

PREPARED

CHECKED

APPD.

DOCUMENT NUMBER:

3963-DGEN-0-04-0001

4 DEC 2018 4 Nov 2018 29 July 2018

th

7 May th

SHT.

001

OF

008

APPD. QP

REV. D

Page 1 of 170

PROJECT PLANNING PACKAGE

TABLE OF CONTENT 1.0 INTRODUCTION: ......................................................................................................................................................3 2.0 INTEGRATED PLANNING NETWORK ........................................................................................................................3 2.1 WEIGHTAGE SYSTEM & S-CURVES: .........................................................................................................................4 3.0 MANPOWER DEPLOYMENT: ....................................................................................................................................4 4.0 PROGRESS MEASUREMENT SYSTEM .......................................................................................................................4 4.1 DETAILED ENGINEERING: ........................................................................................................................................4 4.2 PROCUREMENT: ......................................................................................................................................................5 5.0 EGINEERING DESIGN DRAWING REGISTER (EDDR): ................................................................................................5 6.0 PROCUREMENT REGISTER & PROJECT DOCUMENT REGISTER: ..............................................................................6 7.0 CONSTRUCTION CONTROL REGISTER: .....................................................................................................................6 8.0 EQUIPMENT DEPLOYMENT PLAN: ...........................................................................................................................6 9.0 PROGRESS REPORTING (Monthly, Weekly & Daily): ...............................................................................................6 10.0 Shown Tie-in break down: .....................................................................................................................................7 11.0 Project Execution:..................................................................................................................................................7 11.1 Execution Policy .....................................................................................................................................................7 11.2 Engineering Execution Plan: ..................................................................................................................................7 11.3 Procurement:.........................................................................................................................................................8 11.4 Construction & Commissioning Management: .....................................................................................................9 11.5 Construction Works Execution: .............................................................................................................................9 11.6 Civil works:.......................................................................................................................................................... 10 11.7 Piping Works:...................................................................................................................................................... 10 11.8 Electrical & Instrumentation: ............................................................................................................................. 10 11.9 Pre-commissioning and Commissioning: ........................................................................................................... 10 11.10 Quality Plan: ..................................................................................................................................................... 11 12.0 ATTACHMENTS: .................................................................................................................................................. 11

2|Page Page 2 of 170

PROJECT PLANNING PACKAGE

1.0 INTRODUCTION: CPECC hereby is submitting revised project schedule, incorporating QP letter QP/PND/GC16101100/CP/F/034 for the revised commencement date of the demolishing for Existing Test Separator in FAHM and shutdown tie-in window and FAHM, FAHS, FAHN and JAHM. 

Commissioning Completion dates for the stations are as follow: KAHS : 26th Jan 2019.



KAHM – 27th Jan 2019.



KAHN: 29th Jan 2019.



JALM – 6th April 2019



FAHN – 9th May 2019



FAHS – 20th May 2019



FAHM – 22th May 2019

Rev-D

Milestone completion dates are as follow: 

MS1 – 22th May 2019



MS-2 (Handover final dossier) – 22 July 2019

Apart from the impact on the Project Schedule due to shutdown tie-ins dates and commencement date for FAHM demolishing of existing test separator, following events have also impacted the Project schedule, which are beyond CPECC’s control: • Less Quantity of Piping Bulk Items - Due to less quantity of piping material, we were constrained to choose stockiest in UAE to supply material with 3.1 certification plus test and re-routed from UAE to Qatar from different countries. • Authority prolong approval for various lifting documents and certificates and personals • Delay due to ambiguities/discrepancies/conflicting information in FEED documents. • Substantially increased in FEED quantities in the range of 40% to 200% for steel structural, piping, valves, electrical cable, and instrumentation cable. • Reschedule of Khatiyah stations shutdown from Oct-Nov 2018 to Jan-Feb 2018 In view of above, CPECC further requests QP to approve the revised Project schedule. CPECC hereby commencing weekly and monthly report. 2.0 INTEGRATED PLANNING NETWORK Planning & scheduling is developed using Primavera Project Planner Version 6 R8.2 3|Page Page 3 of 170

PROJECT PLANNING PACKAGE

Manpower estimated for completion of each construction based on productivity, which in detailed define in productivity sheet, attachment-11, which define to manpower require for the scope of work. Progress for Engineering is based on man-hours required to produce Engineering deliverables detailed in register. Procurement is based on cost of the item of procurement detailed in the procurement register. The schedule proposed to be updated weekly and utilized for calculation of earned values for S-Curves . Detailed schedule with planned early start, early finish and original duration is enclosed under Attachment-1. 2.1 WEIGHTAGE SYSTEM & S-CURVES:

Cost based Lev-1 weightage, which define as below, further to fulfill the requirement of appendix D for minimum % weightage of Pre-Commissioning & Handover Dossier, CPECC proposed Lev-1 weightage as below for QP approval.

LEV-1 COST ADJUSTMENT to accommodate 10% Commissionning Contract Price

10% for comm

adjust amount

Revised price

Cost %

Preliminaries General Matters

for monitorting

Engineering

1,602,400.00

112,168.00

1,490,232.00

3.98%

Procurement

26,216,183.00

1,835,132.81

24,326,918.00

65.02%

Const & Inst

8,446,834.00

591,278.38

7,855,555.62

21.00%

Pre-Comm & Comm

1,148,701.00

3,741,411.80

2,592,710.80

3,741,411.80

10.00%

37,414,118.00

3,741,411.80

37,414,117.42

100.00%

Final Handover Dossier

The Lev-2 Progress table, weightage factors, Cost distribution details and S-Curves are enclosed under attachment-2.

3.0 MANPOWER DEPLOYMENT: Manpower deployment is developed based on estimated manpower required for completion of all EPC phases. Detailed matrix of trade wise manpower estimated is enclosed under attachment 5.0. 4.0 PROGRESS MEASUREMENT SYSTEM 4.1 DETAILED ENGINEERING:

Cumulative scales of progress should be compiled using controllable steps of physical work achievements for each generic type of document. Actual progress shall be calculated from the document status register. 4|Page Page 4 of 170

PROJECT PLANNING PACKAGE

     

Start on Drawing Board in a logical sequence 5% Issue for QP review, (IFC) 40% Issued for QP approval, (IFA) 65% Issued as Approved for Construction, ( AFC with hold ) - 85% Issued Approved for Construction (AFC without hold) - 95% Issue As built 100%

4.2 PROCUREMENT:

For procurement, cumulative scales of progress shall be established to monitor each item from the inquiry stage up to the delivery and acceptance at Site. Actual progress shall be calculated from the procurement status register. Two different scales shall apply for Equipment and bulk supply. The progress scale for each package shall be:          

Issue MR for QP approval 5% Issue RFQ to Vendors 10% Issue Purchase Order 15% Vendor Drawing Approval 30% Receipt of filled SPIR 40% Inspection cleared and factory tested - 60% Ex-Works Delivery and FOB Complete - 70% Material received and inspected at Construction site - 85% QP inspected and cleared material at site - 90% All spare parts rec’d and SPIR completed -100%

Bulk Material for Progress tracking only (If deemed necessary by QP) The progress scale for each Purchase Order or Sub-contract shall be:

      

Issue RFQ to Vendors 5% Place order for Bulk material – 15% Material Delivery Ex-works (50% of estimated quantity) - 30% Material Delivery Ex-works (90% of estimated quantity) - 40% Material received at Const. Site(50% of estimated qty) - 50% 90% Material received at Construction Site - 80% All Material received and purchase order closed - 100%

5.0 EGINEERING DESIGN DRAWING REGISTER (EDDR):

Project document register developed based on execution schedule, scope of work in consultation with Engineering team and Discipline Engineers. Project Document Registers are enclosed under attachment 6.0 5|Page Page 5 of 170

PROJECT PLANNING PACKAGE

6.0 PROCUREMENT REGISTER & PROJECT DOCUMENT REGISTER:

Procurement register developed based on Execution schedule, scope of work in consultation with Engineering and Discipline Project Engineers. Procurement enclosed under attachment 7.0. 7.0 CONSTRUCTION CONTROL REGISTER:

Construction Control Register is developed based on Execution schedule, scope of work based on quantity and productivity. Construction register format enclosed under attachment 8.0. 8.0 EQUIPMENT DEPLOYMENT PLAN:

Equipment deployment plan is prepared in consultation with the project execution team. The plan is issued at the start of the project according to the equipment identified in the bid/budget of the job. Equipment deployment plan is enclosed under attachment 9.0 9.0 PROGRESS REPORTING (Monthly, Weekly & Daily):

A weekly progress report with Thursday of the week as cut off shall be submitted to QP on every Sunday early. (Weekly progress reporting formats are enclosed under attachment 10.0 The Monthly Progress Report (MPR) shall be submitted under a cover of transmittal sheet, during the entire duration of the CONTRACT, with last Thursday in a calendar month as cut-of. The report shall be submitted to QP on Sunday and is treated as monthly cut-off, unless otherwise agreed. Monthly Progress Reporting formats are enclosed under attachment 11.0 During Construction Phase Daily Report shall be submitted each morning a daily progress from the previous day, This includes Split trade manpower, machinery deployment (including subcontractor) material received at site, achieved quantities for the major activities. Detailed format and content for the report is finalized in consultation with QP REPRESENTATIVE. Critical Path: Total float less than or equal to 5 days considered as critical activities in revised schedule. There are two critical paths in the current schedule. 1. Driven from procurement, installation pre-commissioning and commissioning of Deluge Skid.

6|Page Page 6 of 170

PROJECT PLANNING PACKAGE

2. Driven from release for demolition of Existing Test Separator in Fahahil Main, construction for new foundation, installation of New Test Separator associate pipping, instrumentation, pre-commissioning and commissioning. 10.0 Shown Tie-in break down:

CPECC will submit detailed Tie-in schedule during shutdown works 4 month before the start for shutdown. 11.0 Project Execution: 11.1 Execution Policy

To ensure the success of the Project, CPECC shall made the following commitment in undertaking the Engineering, Procurement, Construction and Commissioning of the Facility: CPECC will carry out the Works in accordance with the requirement given in the CONTRACT. Higher priority will be given to HSE issues throughout every phase of the Project. CPECC will strictly enforce our Corporate Safety Policy which is “Zero-Accident” and to promote the highest standard of safety in the industry. Throughout the execution of the Project, CPECC will maintain the Quality Standard embodied within the Project requirements for world-class facility. CPECC will draw maximum synergies from the utilization of our technical and operational specialties, while optimizing proficiency from standardization of activities. Majority of the scope of WORK for engineering, procurement, construction and commissioning are planned to self-perform by CPECC. Minor works like Site investigation & survey, TPI, temporary facilities works, etc. will be subcontracted to others. Early Tie-in works for Khatiya Stations are critically planned & executed for early engineering, procurement at early phase of the project.

11.2 Engineering Execution Plan:

Design and detail engineering activities will be carried out at our Engineering Office in Dubai. The full engineering scope shall maximized the synergies arising from the best utilization of available technical excellence and qualified resources our engineering organization. The Dubai Office will be responsible for the overall project areas as follows:  Detailed Engineering  Procurement Management 7|Page Page 7 of 170

PROJECT PLANNING PACKAGE

 

Expediting Material Third Party Studies and Design Review.

First main step will be definition of the Technical Design Basis and Early Tie-in package, which cover early tie-in philosophy, data sheets and specification for early tie-in materials, in liaison with the COMPANY and follow by the preparation of general technical specifications, procedures and documentation, common throughout the whole project. These preliminary activities will be executed from Dubai office, where COMPANY’s reviews will take place through online ASSAI system The project engineering office in Dubai coordinates further to Qatar Site Office, according to well established Corporate Procedures and Work Practices. Proper coordination and contribution from Qatar Site will be ensured through the incharge Field Construction team and/or specific assignments of concerned Specialists Sub Contractor (e.g. Site Investigation Sub Contractor). As Company instruction, detailed engineering will prepare early tie-in package, which allows for early procurement of valves pipes and fittings to accommodate Khatiya Shutdown plans in Jan and Feb 2018. 11.3 Procurement:

Procurement activities for early tie-in materials are planned at early phase of project follow by project remaining materials. Project Procurement will be managed as to ensure that the following main objectives are reached: Procurement of fit for purpose materials from project approved Vendors only, and in compliance with the project’s technical, quality and safety requirements; Procurement in compliance with project schedule requirements, with timely delivery of information from vendors to engineering and materials to Construction; Procurement against the budget and Contract requirements. Relevant main drivers will be: Overall coordination of procurement activities to ensure consistency and homogeneous implementation of common principles and procedures throughout the whole project, under the responsibility of Project Management Team, from Qatar Home Office, as well as support Qatar Site office for local procurement, whenever needed; Tried and tested execution systems; Maximization of materials standardization, and early spare parts definition and purchasing, in coordination with COMPANY; Special care will be devoted to procurement of long lead items on schedule and out of the critical path. In this respect, CPECC will Early issue of purchased orders (as practical as possible), based on material requisitions developed during the bidding phase; Implement close expediting and control of vendor data Operate a high level of surveillance at vendors’ workshops to monitor the progress of manufacturing; With regard to critical items. CPECC intends at maximum possible extent to manage their purchased Order by placing blanket purchased orders based initially on preliminary MTO and the piping classes’ specifications developed by CPECC from those available in ITT documentations.

8|Page Page 8 of 170

PROJECT PLANNING PACKAGE

Details on Procurement organization, vendor’s qualification, expediting and inspection procedures and traffic & logistics plans as well as on material management systems are further given within the Procurement Plan and associated procedures. 11.4 Construction & Commissioning Management:

The Project Manager is mobilized to Qatar Site to take the overall management of the project from the Site. A team of appointed staffs mainly the Construction Manager and construction supervisory staffs from CPECC corporate resources will carry out Site Construction Management. At Dubai Office, construction will be carried-out during planning stage. The early involvement of Construction as well as Commissioning personnel is to familiarize with the project and assist in the development of the project plans and to provide input and direction to the overall project team. The organization Site Management Head will define the requirements for the Project, will monitor the implementation of the same and will interface the COMPANY. This team will coordinate the Construction Supervision Organization of CPECC that will be tailored for the follow-up of Works on field according to discipline and physical areas. Activities of the construction management team will start early after effective date, integrating with Dubai Office and Qatar Site Office, as needed to fully and smoothly prepare and plan in advance all construction activities and the issue and delivery to site of all needed deliverables, documents and materials, within the planned schedule. 11.5 Construction Works Execution:

This will be carried out through a majority of self-performance by CPECC, a balanced mix of subcontracts (mainly civil works), as to maximize works execution efficiency and quality under the supervision of CPECC’s Site Management Team. This joint team will coordinate the Field supervision groups in charge for the different Site Areas. A single system of Site procedures and method statements will be followed in the execution of works across the whole site and close liaison with the Engineering Organization will be maintained in order to ensure the most effective transfer of information from engineering to construction. Fabrication and laydown area is planned in Dukhan field, however to ensure early tie-in timely completion. Local sub-contractor for fabrication and painting of early tie-in works also under evaluation. The revised plan schedule mechanical, instrumentation works are driven by material deliveries, fabrication and delivery to site. However, civil works are carried out independently.

9|Page Page 9 of 170

PROJECT PLANNING PACKAGE

Calendar : • • •

For construction and pre-commissioning is consider 6days/ week. For commissioning is consider 7 days/ week Eid holidays consider only one day off, remaining days continue will be working.

11.6 Civil works:

Equipment foundations are most ready in all station stations except Fahahil Main. Pipe support foundations are in progress at Fahahil and Jaleha stations. Due to clashes with existing foundation. CPECC Civil Engineer spent two weeks at site in the month of July to resolve the site clashed. Revised pipe support drawings are AFC by End Aug, hence the pipe support is planned accordingly. However, as lesson learn from excavation low productivity. CPECC adding more manpower for the excavation of pipe supports, & remaining civil works. Steel Structure Fabrication is in progress with sub-contractor in Doha and closely monitored to achieve the deliveries for smooth execution of erection and installation activity. 11.7 Piping Works:

Piping fabrication also planned in two shifts, in order to mitigate the late delivery of materials. For Non FBE coated pipes. The pipes will be fabricated in Qatar in Med gulf & Dopet fabrication facility, which are performing as Sub-Contractor for CPECC for Piping fabrication work. For FBE coated pipes. The pipes will be fabricated in Kuwait with the same fabricator, who will do the FBE coating. 11.8 Electrical & Instrumentation:

CPECC has awarded subcontract for E&I works to IMCO for 3 Khatiyah degassing station & remaining 4 station shall be executed by CPECC E&I team as per the revised schedule. 11.9 Pre-commissioning and Commissioning:

A team from CPECC will organize and supervise the activity that will be physically carried out by manpower from CPECC with vendor site support. CPECC will lead the management side (system breakdowns, turnover procedures and the like) CPECC will arrange Vendors’ assistance as required, supported by timely planning of activities to ensure coping with project completion schedule. Preparatory activities relevant to Pre-commissioning and Commissioning management will start timely after effective date in the Home Office, in order to define and plan in 10 | P a g e Page 10 of 170

PROJECT PLANNING PACKAGE

advance all systems and units commissioning activities in coordination with and driving the construction plans, as well as instructing specific commissioning requirements to the Engineering specialists. 11.10 Quality Plan:

CPECC’s management system utilizes certified ISO 9001:2000 Quality Systems as a basis, supported by project specific plans and procedures to ensure that systemic auditable controls are in place and expectations are being met. WPS and PQR will be developed at early phase of project to facilitate early tie-in fabrication works. CPECC will develop a comprehensive Quality Plan in order to ensure that all HSE, Quality and Technical Integrity issues relating to the satisfactory execution of the works in full compliance with all applicable codes, standards, specifications and COMPANY expectations are identified and satisfactorily managed. This Quality Plan will also address in a systematic manner the major actions required to satisfactorily complete all Project phases, detailing process and procedures to be followed by the Engineering, Procurement, Construction and Commissioning Resources to achieve the COMPANY HSE, Quality and Technical Integrity Expectations. A Quality Assurance/ Quality Control Manager is appointed on the Project with the responsibility to maintain a high-level overview and audit function to ensure that measures are taken to grant compliance with the Assurance Plan at all levels of CPECC’s organization. 12.0 ATTACHMENTS: Attachment -1 Updated Revised Baseline Schedule Attachment -2 Critical path Attachment -3 Jaleha Shutdown Schedule Attachment – 4 Progress table, weightage factors lev-2

Attachment – 5 S-Curves

Attachment - 6 Manpower Histogram

Attachment - 7 EDDR

Attachment - 8 Procurement Register 11 | P a g e Page 11 of 170

PROJECT PLANNING PACKAGE

Attachment - 9 Construction Control Register

Attachment - 10 Construction Equipment Deployment Register

Attachment - 11 Weekly Report format

Attachment - 12 Monthly Report Format

Attachment - 13 Productivity Calculation Attachment - 14 Invoice Format

12 | P a g e Page 12 of 170

PROJECT PLANNING PACKAGE

Attachment 1

UPDATED REVISED BASELINE SCHEDULE

Page 13 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

Rev-D by TA E EPIC for Replacement of Old 3-Phase Test Separators at A Milestone

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

07-Feb-17

18-Feb-19

785

07-Feb-17

18-Feb-19

785

A1000

CONTRACT AWARD

07-Feb-17

DE1000

EFFECTIVE DATE

19-Feb-17

DE3380

ALL WORKS COMPLETE - MS1

DE1010

ACHIEVED - SCHEDULE COMPLETE 01-Apr-17

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

290

06-Feb-17 A

22-Jul-19

0

22-Jul-19

0

22-May-19*

0

276

06-Feb-17 A

0

100%

0

06-Feb-17 A

0

100%

0

19-Feb-17 A

0

0%

0

18-Feb-19

0

0%

0

20-Sep-17

124

18-Dec-18

Detailed Engineering Enginee

Phy. % Com.

Page 1 of32

0

20-Apr-17 A

22-Jul-19*

0

31-Dec-18

145

DE3320

ISSUE SHUTDOWN VALVE MTO/ DATASHEETS/ SPECIFICATION

01-Apr-17

0

100%

0

20-Apr-17 A

DE3330

ISSUE SHUTDOWN PIPING AND BULK MTO

27-Apr-17

0

100%

0

08-May-17 A

DE3260

ISSUE DESIGN BASE MEMORANDUM

08-May-17

0

100%

0

29-Jun-17 A

DE3270

ISSUE MR FOR TEST SEPARATORS

13-May-17

0

100%

0

28-May-17 A

DE3280

ISSUE MR FOR METERING

13-May-17

0

100%

0

12-Jul-17 A

DE3310

ISSUE SHUTDOWN PHILOSOPHY

15-May-17

0

100%

0

13-Jul-17 A

DE1020

HAZOP STUDY WORKSHOP

24-May-17

0

100%

0

08-Nov-17 A

DE3300

MR FOR DCS MODIFICATION

28-Jun-17

0

100%

0

10-Aug-17 A

DE3290

ISSUE MR FOR DELUGE

19-Jul-17

0

100%

0

25-Jul-17 A

DE1030

EQUIPMENT FOUNDATIONS AFC

03-Sep-17

0

100%

0

28-Jun-18 A

DE1040

DETAILED ENGINEERING COMPLETE

20-Sep-17

0

0%

0

31-Dec-18

145

31-Jan-19

119

14-Jul-18

452

DE3340

PO ISSUE SHUTDOWN VALVE FOR THREE STATIONS

08-May-17

08-May-17

0

100%

0

DE3350

PO ISSUE SHUTDOWN PIPING/ FITTING & BULK FOR THREE STATIONS

28-May-17

0

100%

0

17-Jul-17 A

DE3200

PO ISSUE FOR TEST SEPARATOR

19-Jul-17

0

100%

0

10-Sep-17 A

DE3370

DELIVERY OF PIPING AND FITTINGS FOR KS SHUTDOWN

16-Aug-17

0

100%

0

02-Nov-17 A

DE3240

PO FOR DCS MODIFICATION

05-Sep-17

0

100%

0

28-Dec-17 A

DE3220

PO ISSUE OF DELUGE SKID

27-Sep-17

0

100%

0

22-Feb-18 A

DE3360

DELIVERY OF VALVES KS FOR SHUTDOWN

30-Sep-17

0

100%

0

31-Oct-17 A

DE3250

DELIVERY OF DCS MODIFICATION SITE-EARLY TIE-IN

03-May-18

0

100%

0

20-Jan-18 A

DE3210

DELIVERY OF TEST SEPARATOR AT SITE (Last Batch)

14-Jul-18

0

100%

0

25-Aug-18 A

DE7260

DELIVERY OF DCS MODIFICATION WORK

0

0%

0

13-Dec-18

11

DE7280

DELIVERY OF DELUGE SKID SITE - 1st batch

0

0%

0

31-Dec-18

55

DE7290

DELIVERY OF FBE COATED PIPE AT SITE FROM KUWAIT

0

0%

0

01-Jan-19

36

DE7300

DELIVERY OF GGC VALVE

0

100%

0

11-Jul-18 A

DE7310

DELIVERY OF BALL VALVES

0

100%

0

13-Sep-18 A

DE7320

DELIVERY OF CONTROL VALVES

0

100%

0

28-Aug-18 A

DE7330

DELIVERY OF FLOW METERS

0

0%

0

10-Dec-18

DE7340

DELIVERY OF BS&W

0

100%

0

27-Sep-18 A

DE7350

DELIVERY OF INSTRUMENT CALBES

0

0%

0

22-Nov-18

22

DE7360

DELIVERY OF LEVEL GUAGE GLASS TYPE

0

0%

0

10-Dec-18

22

DE7370

DELIVERY OF MAGNETIC TYPES GUAGES

0

0%

0

10-Dec-18

15

DE7380

DELIVERY OF GUAGES PG / TG

0

0%

0

10-Dec-18

14

DE7390

DELIVERY OF 1ST BATCH OF PIPING

0

100%

0

30-Jul-18 A

DE7400

DELIVERY OF LAST BATCH OF PIPING

0

100%

0

27-Sep-18 A

DE7410

DELIVERY OF SDV/BDV

0

0%

0

20-Dec-18

11

DE7420

DDELIVERY OF DELUGE SKID 2ND BATCH

0

0%

0

31-Jan-19

9

22-May-19

0

Procurement

03-Oct-17

Construction

08-Dec-18

75

368

11-May-17 A

169

10-Dec-17 A

KAHM START WORKS

03-Oct-17

0

100%

0

10-Dec-17 A

A1060

KAHN START WORKS

29-Nov-17

0

100%

0

16-Dec-17 A

A1070

KAHS START WORKS

10-Jan-18

0

100%

0

25-Dec-17 A

A1080

JALM START WORKS

20-Feb-18

0

100%

0

05-Jun-18 A

Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone

3963-Rev-D.-1

Page 1 of 32

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

M 2

A 3

M 4

2017 J Jul A 5 6 7

S 8

17:45

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

11-May-17 A

A1050

Primary Baseline

F 1

29-Nov-18

19

Date 29-Nov-18 06-Nov-18

U-3963_REV-D Revision Rev-D Revised schedule Rev-C Revised schedule

Checked

Approved

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan U3963- Updated Revised Baseline Schedule.

Page 14 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

08-Apr-18 A

A1090

FAHS START WORKS

28-Apr-18

0

100%

0

A1190

FAHM START WORKS - ISOLATION OF EXISTING SEPARATOR

09-May-18

0

0%

0

07-Nov-18

A1180

FAHN START WORKS

19-Jun-18

0

100%

0

05-May-18 A

A1020

START OF 1ST INSTALLATION OF TEST SEPARATOR

15-Jul-18

0

100%

0

09-Aug-18 A

38 0

100%

0 0

07-Jan-18 A 07-Jan-18 A

06-Dec-17

0

100%

0

23-Dec-17

39 0

100%

0 0

23-Dec-17

0

100%

0

23-Dec-17

38 0

100%

0 0

23-Dec-17

0

100%

0

08-Oct-18 08-Oct-18

0 0

0%

12 0

0

Shutdown Tie-in for Khatiyah North A1100 SHUTDOWN START A1170

SHUTDOWN COMPLETE

Shutdown Tie-in for Khatiyah Main A1110 SHUTDOWN START A1200

JALM Tie-ins A1220 A1330

08-Oct-18 FLARE HEADER HOT TAPPING COMPLETE 25-Oct-18

25-Oct-18 25-Oct-18

SHUTDOWN TIE-INS 29-Oct-18

SHUTDOWN TIE-INS

Fahahil Main Tie-ins Tie A1240 FLARE HEADER HOT TAPPING COMPLETE A1460

06-Dec-17

SHUTDOWN TIE-IN

Fahahil North Tie Tie-ins A1150 FLARE HEADER HOT TAPPING COMPLETE A1160

07-Nov-17 07-Nov-17

SHUTDOWN COMPLETE

Fahahil South Tie Tie-ins A1230 FLARE HEADER HOT TAPPING COMPLETE A1340

06-Nov-17 06-Nov-17

SHUTDOWN COMPLETE

Shutdown Tie-in for Khatiyah South A1120 SHUTDOWN START A1210

24-Oct-17 24-Oct-17

29-Nov-18

08-Oct-18

0

0%

0 0

0

0%

0

17-Nov-18 29-Oct-18

16 0

0%

0 0

17-Nov-18

0

0%

0

29-Nov-18 29-Nov-18

0 0

0%

15 0

0

0%

0

08-Dec-18 08-Oct-18

52 0

0%

100 0

SHUTDOWN TIE-INS

Commissioninng A1260 COMPLETE OF COMMISSIONING AT KHATIYAH MAIN

0%

0 0

Page 2 of32 Act. Fin / F-C Fin

TF

17-Feb-18 A 28-Feb-19

22-Apr-19

22-Apr-19

16-Mar-19 28-Feb-19

19 31

16-Mar-19

9

22-Apr-19 22-Apr-19

24 24

22-Apr-19

15

22-Apr-19 22-Apr-19

15 15

22-Apr-19

15

06-Apr-19

22-Apr-19 06-Apr-19

26 41

22-Apr-19

0

26-Jan-19

22-May-19 27-Jan-19*

0 0

29-Jan-19*

0

A1280

COMPLETE OF COMMISSIONING AT KHATIYAH SOUTH

10-Nov-18

0

0%

0

26-Jan-19*

0

A1290

COMPLETE OF COMMISSIONING AT JALM

17-Nov-18

0

0%

0

06-Apr-19*

0

A1300

COMPLETE OF COMMISSIONING AT FAHAHIL SOUTH

26-Nov-18

0

0%

0

20-May-19*

0

A1320

COMPLETE OF COMMISSIONING AT FAHAHIL MAIN

26-Nov-18

0

0%

0

22-May-19*

0

A1310

COMPLETE OF COMMISSIONING AT FAHAHIL NORTH

08-Dec-18

0

0%

0

09-May-19*

0

18-Feb-19

0

22-Jul-19

0

18-Feb-19

0

19-Feb-17

20-Sep-17

154

48

19-Feb-17

20-Sep-17

154

DESIGN BASIS MEMORANDUM

19-Feb-17 19-Feb-17

30-May-17 07-May-17

73 63

DE3390

PLANNING PACKAGE IFR

19-Feb-17

30-Apr-17

DE3400

FEED VALIDATION

19-Feb-17

14-Mar-17

DE3770

EDDR

13-Mar-17

DE6770

SITE VISIT REPORT

DE3780

ENGINEERING EXECUTION PLAN

DE7250

22-Jul-19

22-Jul-19

0

19-Feb-17 A

31-Dec-18

145

48

19-Feb-17 A

31-Dec-18

145

100%

0 0

19-Feb-17 A 15-Mar-17 A

14-Dec-17 A 07-Dec-17 A

57

100%

0

16-Mar-17 A

27-Sep-17 A

20

100%

0

19-Feb-17 A

14-Mar-17 A

29-May-17

63

100%

0

12-Mar-17 A

03-Aug-17 A

14-Mar-17

30-May-17

63

100%

0

15-Mar-17 A

14-Dec-17 A

14-Mar-17

30-May-17

63

100%

0

15-Mar-17 A

10-May-17 A

HAZOP/HAZID WORKSHOP

18-May-17

24-May-17

5

100%

0

05-Nov-17 A

08-Nov-17 A

PROCESS EQUIPMENT LIST (DGEN)

19-Feb-17 19-Feb-17

18-Sep-17 07-May-17

152 63

100%

48 0

02-Apr-17 A 11-May-17 A

31-Dec-18 18-Jan-18 A

DE3750

PROCESS UTILITY CONSUMPTION SUMMARY (DGEN)

20-Feb-17

08-May-17

62

100%

0

25-May-17 A

27-Sep-17 A

DE3440

PROCESS OTHER REPORTS (DGEN)

27-Feb-17

20-Jun-17

92

100%

0

22-Jun-17 A

22-Feb-18 A

DE3460

PROCESS SIMULATION & H&MB REPORT (DGEN)

02-Apr-17

15-Jun-17

62

100%

0

10-Apr-17 A

18-Jul-17 A

DE3420

PROCESS DESIGN CALCULATIONS (DGEN)

11-Apr-17

18-Sep-17

129

100%

0

02-Apr-17 A

12-Oct-17 A

DE3410

PROCESS LEGEND, SYMBOLS & DRAWING INDEX (DGEN)

17-Apr-17

03-Jul-17

62

100%

0

18-Apr-17 A

02-Oct-17 A

DE6780

PROCESS DESCRIPTION

03-May-17

19-Jul-17

62

100%

0

04-May-17 A

28-Sep-17 A

DE3470

PROCESS PHILOSOPHIES (DGEN)

18-May-17

11-Sep-17

92

100%

0

28-Jun-17 A

24-Sep-18 A

DE3450

PROCESS OPERATING MANUALS (DGEN)

25-Jul-17

14-Sep-17

42

70%

48

25-May-17 A

31-Dec-18

PIPING DATA SHEETS (DGEN)

02-Mar-17 02-Mar-17

20-Sep-17 24-Jul-17

144 116

100%

0 0

15-Mar-17 A 15-Mar-17 A

01-Feb-18 A 05-Oct-17 A

Detail Engineering General & Common Comm General DE3760

Process DE3430

Piping DE3620

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

17-Feb-18 A

0

0

S 8

14-Feb-18 A 06-Feb-18 A 06-Feb-18 A

0%

0%

2017 J Jul A 5 6 7

14-Feb-18 A

0

18-Feb-19

M 4

14-Feb-18 A 11-Jan-18 A 11-Jan-18 A

30-Oct-18

FINAL DOCUMENTATION / HANDOVER DOSSIER

A 3

14-Feb-18 A

COMPLETE OF COMMISSIONING AT KHATIYAH NORTH

A1250

M 2

17:45

44

A1270

Final documentation documenta & As Built / Handover

F 1

29-Nov-18

0

145

145

Page 15 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule.

Page 3 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

30-Nov-17 A

DE6860

PIPING EARLY TIE-IN PACKAGE (DGEN)

02-Mar-17

14-May-17

59

100%

0

15-Mar-17 A

DE6970

PIPING TBES FOR EARLY TIE-IN BALL VALVES (DGEN)

23-Mar-17

08-Jun-17

63

100%

0

15-Mar-17 A

25-Jul-17 A

DE3630

PIPING SPECIFICATIONS (DGEN)

29-Mar-17

29-Jun-17

75

100%

0

29-Mar-17 A

08-Oct-17 A

DE3640

PIPING MRS (DGEN)

21-May-17

21-Aug-17

75

100%

0

21-Mar-17 A

21-Dec-17 A

DE3650

PIPE SUPPORT DETAILS (DGEN)

20-Jul-17

11-Sep-17

43

100%

0

27-Jul-17 A

01-Feb-18 A

DE3660

PIPING TBES (DGEN)

26-Jul-17

20-Sep-17

45

100%

0

20-Jul-17 A

29-Jan-18 A

MECHANICAL SPECIFICATIONS (SEPARATOR)

15-Mar-17 15-Mar-17

12-Sep-17 20-Jun-17

130 79

100%

0 0

05-Apr-17 A 05-Apr-17 A

01-Oct-17 A 03-Aug-17 A

DE6990

MECHANICAL DATA SHEETS (SEPARATOR)

27-Mar-17

12-Jun-17

63

100%

0

27-Apr-17 A

03-Aug-17 A

DE3480

MECHANICAL MRS (SEPARATOR)

03-Apr-17

09-Jul-17

79

100%

0

11-May-17 A

31-Jul-17 A

DE3490

MECHANICAL TBES (DGEN)

24-Jul-17

12-Sep-17

42

100%

0

03-Aug-17 A

01-Oct-17 A

20-Jun-17 31-May-17

69 62

15-Mar-17 A 15-Mar-17 A

23-May-17 A 07-May-17 A

Mechanical DE7000

ELECTRICAL DATA SHEETS (DGEN)

16-Mar-17 16-Mar-17

100%

0 0

DE3520

ELECTRICAL SPECIFICATIONS (DGEN)

16-Mar-17

08-Jun-17

69

100%

0

15-Mar-17 A

23-May-17 A

DE3510

ELECTRICAL TYPICAL INSTALLATION DETAILS (DGEN)

29-Mar-17

20-Jun-17

68

100%

0

02-Apr-17 A

07-May-17 A

Civil DE3590

CIVIL SPECIFICATIONS (DGEN)

14-Mar-17 14-Mar-17

03-Sep-17 06-Jun-17

123 69

100%

0 0

14-Mar-17 A 14-Mar-17 A

02-May-18 A 18-May-17 A

DE3600

CIVIL GENERAL NOTES (DGEN)

14-Mar-17

30-May-17

63

100%

0

16-Mar-17 A

24-May-17 A

DE3790

CIVIL TYPICAL DETAILS (DGEN)

21-Mar-17

03-Sep-17

133

100%

0

14-Mar-17 A

28-Mar-18 A

DE3580

CIVIL DESIGN BASIS (DGEN)

13-Apr-17

02-Jul-17

63

100%

0

21-Mar-17 A

01-Jun-17 A

DE3570

CIVIL MTOS (DGEN)

25-May-17

10-Aug-17

62

100%

0

25-May-17 A

12-Oct-17 A

DE3560

CIVIL DEMOLITION DRAWINGS (DGEN)

30-May-17

15-Aug-17

62

100%

0

31-May-17 A

23-Nov-17 A

DE3610

CIVIL DESIGN CALCULATIONS (DGEN)

13-Jun-17

29-Aug-17

62

100%

0

08-Jul-17 A

02-May-18 A

FIRE & SAFETY STUDIES (DGEN)

23-Mar-17 23-Mar-17

20-Sep-17 08-Jun-17

129 63

100%

0 0

26-Mar-17 A 29-Mar-17 A

09-Sep-18 A 20-Jun-17 A

DE3680

HSE PLAN (DGEN)

30-Mar-17

15-Jun-17

62

100%

0

26-Mar-17 A

08-Jun-17 A

DE3670

HSE SPECIFICATIONS (DGEN)

09-Apr-17

05-Jul-17

71

100%

0

05-Apr-17 A

03-Jan-18 A

DE3700

HSE REPORTS (DGEN)

19-Apr-17

19-Sep-17

124

100%

0

05-Apr-17 A

20-Mar-18 A

DE7120

HSE CALCULATIONS (DGEN)

24-Apr-17

10-Jul-17

62

100%

0

05-Apr-17 A

23-Jan-18 A

DE3710

HSE REGISTER (DGEN)

04-May-17

20-Sep-17

111

100%

0

25-May-17 A

09-Sep-18 A

DE7110

HAZARDOUS AREA CLASSIFICATION PHILOSOPHY AND SCHEDULE (DGEN)

14-May-17

30-Jul-17

62

100%

0

03-Apr-17 A

18-Jul-17 A

DE3740

HSE STUDIES (DGEN)

20-Jun-17

05-Sep-17

62

100%

0

05-Apr-17 A

28-Jul-18 A

DE3690

HSE MRS (DGEN)

04-Jul-17

19-Sep-17

62

100%

0

04-Jul-17 A

09-Jan-18 A

DE3720

HSE TBES (DGEN)

07-Aug-17

14-Sep-17

32

100%

0

19-Oct-17 A

28-Mar-18 A

INSTRUMENTS SPECIFICATIONS (DGEN)

03-Apr-17 03-Apr-17

20-Sep-17 09-Jul-17

123 79

100%

0 0

14-Mar-17 A 14-Mar-17 A

26-May-18 A 14-Sep-17 A

DE3530

INSTRUMENTS MRS (DGEN)

29-May-17

14-Sep-17

89

100%

0

14-Mar-17 A

19-Oct-17 A

DE3540

INSTRUMENTS SCOPE OF WORK (DGEN)

06-Jun-17

22-Aug-17

63

100%

0

08-Jun-17 A

25-Sep-17 A

DE3550

INSTRUMENTSTBES (DGEN)

20-Jul-17

20-Sep-17

51

100%

0

15-Mar-17 A

26-May-18 A

DE3800

INSTRUMENTS DIAGRAMS (DGEN)

01-Aug-17

18-Sep-17

39

100%

0

01-Aug-17 A

13-Nov-17 A

DE3810

INSTALLATION DETAILS (DGEN)

15-Aug-17

20-Sep-17

30

100%

0

01-Aug-17 A

19-Oct-17 A

07-Mar-17

20-Sep-17

142

0

12-Mar-17 A

26-Aug-18 A

28-Aug-17 15-Jun-17

112 68

100%

0 0

02-Apr-17 A 04-Apr-17 A

11-Mar-18 A 04-Dec-17 A

Electrical DE3500

Safety DE3730

Instrument DE6980

Khatiyah North Process DE6350

PROCESS PFDS (KAHN)

23-Mar-17 23-Mar-17

DE6360

PROCESS P&IDS (KAHN)

17-Apr-17

03-Jul-17

62

100%

0

02-Apr-17 A

11-Mar-18 A

DE6370

PROCESS P&IDS (DEMOLITION) (KAHN)

17-Apr-17

03-Jul-17

62

100%

0

02-Apr-17 A

03-Jan-18 A

DE6790

PFD FOR FIRE WATER NETWORK (KAHN)

19-Apr-17

05-Jul-17

62

100%

0

19-Apr-17 A

04-Dec-17 A

DE6340

PROCESS LINE DESIGNATION TABLES (KAHN)

12-Jun-17

28-Aug-17

62

100%

0

11-Jul-17 A

24-Jan-18 A

EARLY TIE-IN VALVE LIST (KAHN)

07-Mar-17 07-Mar-17

20-Sep-17 22-May-17

142 62

100%

0 0

12-Mar-17 A 15-Mar-17 A

13-Apr-18 A 12-Jun-17 A

DE6960

PIPING EQUIPMENT LOCATION PLAN (KAHN)

29-Mar-17

13-Jun-17

62

100%

0

09-Apr-17 A

21-Jan-18 A

DE6490

PIPING PLOT PLANS (KAHN)

29-Mar-17

14-Jun-17

63

100%

0

12-Mar-17 A

21-Jan-18 A

DE6620

PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (KAHN)

16-May-17

10-Aug-17

71

100%

0

25-May-17 A

02-Nov-17 A

DE6640

PIPING STRESS ANALYSIS REPORT (KAHN)

05-Jun-17

20-Aug-17

62

100%

0

07-Jun-17 A

21-Jan-18 A

DE6660

PIPING MTOS (KAHN)

11-Jun-17

27-Aug-17

63

100%

0

11-Jul-17 A

10-Jan-18 A

DE6670

PIPING CRITICAL LINE LIST (KAHN)

21-Jun-17

06-Sep-17

63

100%

0

21-Jun-17 A

29-Aug-17 A

DE6520

PLOT PLANS (DEMOLITION) (KAHN)

25-Jun-17

10-Sep-17

63

100%

0

29-Jun-17 A

18-Oct-17 A

Piping DE6870

TF

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:45

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 16 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule.

Page 4 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

DE6650

PIPING KEY PLANS (KAHN)

29-Jun-17

14-Sep-17

63

100%

0

06-Jul-17 A

28-Nov-17 A

DE6510

PIPING G.A (KAHN)

13-Jul-17

19-Sep-17

55

100%

0

15-Jul-17 A

21-Feb-18 A

DE6680

PIPING MTOS (DEMOLITION) (KAHN)

16-Jul-17

17-Aug-17

28

100%

0

05-May-17 A

10-Jan-18 A

DE6500

PIPING TIE-IN PACKAGES & SCHEDULES (KAHN)

18-Jul-17

11-Sep-17

45

100%

0

15-Jul-17 A

13-Apr-18 A

DE6610

PIPE SUPPORT LIST (KAHN)

27-Jul-17

18-Sep-17

43

100%

0

14-Oct-17 A

21-Jan-18 A

DE6530

PIPING G.A (DEMOLITION) (KAHN)

03-Aug-17

20-Sep-17

39

100%

0

20-Aug-17 A

19-Nov-17 A

DE6630

PIPING ISOMETRICS (KAHN)

09-Aug-17

14-Sep-17

30

100%

0

29-Dec-17 A

01-Apr-18 A

07-Sep-17 10-Aug-17

105 96

14-Apr-17 A 14-Apr-17 A

26-Feb-18 A 05-Oct-17 A

04-May-17 A

25-Sep-17 A

ELECTRICAL CALCULATIONS (KAHN)

13-Apr-17 13-Apr-17

100%

0 0

DE6380

TIE-IN, CABLES & INTERCONNECTION SCHEDULES (KAHN)

25-May-17

07-Sep-17

84

100%

0

DE6400

ELECTRICAL ADEQUACY REORTS (KAHN)

29-May-17

14-Aug-17

62

100%

0

01-Jun-17 A

24-Sep-17 A

DE6390

SINGLE LINE DIAGRAMS (KAHN)

15-Jun-17

31-Aug-17

62

100%

0

07-May-17 A

25-Sep-17 A

DE6700

LIGHTING LAYOUT (KAHN)

15-Jun-17

22-Aug-17

55

100%

0

22-May-17 A

03-Aug-17 A

DE6720

EARTHING & CABLE ROUTING LAYOUTS (KAHN)

15-Jun-17

31-Aug-17

62

100%

0

17-Jun-17 A

29-Oct-17 A

DE6710

ELECTRICAL MTOS (KAHN)

09-Jul-17

10-Aug-17

27

100%

0

04-Jul-17 A

26-Feb-18 A

DRAINAGE LAYOUTS & DETAILS (KAHN)

18-Apr-17 18-Apr-17

15-Aug-17 04-Jul-17

86 63

100%

0 0

21-Mar-17 A 22-Mar-17 A

07-Mar-18 A 04-Feb-18 A

Electrical DE6690

Civil DE7180 DE6450

GRADING & ROAD LAYOUTS & DETAILS (KAHN)

18-Apr-17

04-Jul-17

63

100%

0

21-Mar-17 A

07-Feb-18 A

DE6460

PLATFORMS STRUCTURAL DETAILS (KAHN)

16-May-17

01-Aug-17

63

100%

0

25-May-17 A

05-Feb-18 A

DE6470

FOUNDATIONS GA, PLANS & DETAILS (KAHN)

16-May-17

15-Aug-17

74

100%

0

25-May-17 A

07-Mar-18 A

DE6480

PIPE SUPPORT LAYOUTS & SCHEDULES (KAHN)

16-May-17

01-Aug-17

63

100%

0

28-Nov-17 A

13-Dec-17 A

HAZARDOUS AREA SCHEDULES (KAHN)

18-May-17 18-May-17

21-Aug-17 03-Aug-17

67 62

100%

0 0

03-May-17 A 25-May-17 A

26-Aug-18 A 22-Mar-18 A

DE6560

HSE LAYOUTS (DEMOLITION) (KAHN)

18-May-17

03-Aug-17

62

100%

0

25-May-17 A

26-Aug-18 A

DE6570

F&G AND PROCESS CAUSE & EFFECT CHARTS (KAHN)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

08-Apr-18 A

DE6550

HSE LAYOUTS (KAHN)

24-May-17

08-Aug-17

61

100%

0

25-May-17 A

26-Aug-18 A

DE6580

HSE DATA SHEETS (KAHN)

24-May-17

21-Aug-17

71

100%

0

03-May-17 A

24-Jan-18 A

DE6590

HSE P&IDS (KAHN)

24-May-17

10-Aug-17

63

100%

0

03-May-17 A

11-Jan-18 A

DE7130

DEMOLITION PROCESS CAUSE & EFFECT CHARTS (KAHN)

29-May-17

14-Aug-17

62

100%

0

08-Jul-17 A

23-Aug-17 A

INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (KAHN)

20-Apr-17 20-Apr-17

20-Sep-17 15-Aug-17

110 95

100%

0 0

14-Mar-17 A 11-May-17 A

26-Feb-18 A 25-Jan-18 A

DE6600

INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (KAHN)

27-Apr-17

10-Aug-17

86

100%

0

18-May-17 A

12-Oct-17 A

DE6410

INPUT/OUTPUT LISTS (DEMOLITION) (KAHN)

27-Apr-17

13-Jul-17

63

100%

0

14-Mar-17 A

26-Jul-17 A

DE6730

INSTRUMENTS DATA SHEETS (KAHN)

01-May-17

08-Aug-17

81

100%

0

04-Apr-17 A

21-Dec-17 A

DE6430

INSTRUMENTS DIAGRAMS (KAHN)

04-May-17

20-Sep-17

113

100%

0

25-May-17 A

26-Feb-18 A

DE6420

INSTRUMENTS INDEX (KAHN)

30-May-17

14-Aug-17

62

100%

0

31-May-17 A

19-Oct-17 A

DE6740

INPUT/OUTPUT AND ALARM & TRIP LISTS (KAHN)

04-Jun-17

03-Sep-17

74

100%

0

07-Jun-17 A

10-Dec-17 A

DE6440

INSTRUMENTS SCOPE OF WORK (KAHN)

13-Jun-17

29-Aug-17

63

100%

0

11-Jul-17 A

19-Oct-17 A

DE6750

INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (KAHN)

25-Jun-17

12-Sep-17

65

100%

0

28-Jun-17 A

19-Oct-17 A

DE6760

INSTRUMENTS MTO (KAHN)

09-Aug-17

12-Sep-17

28

100%

0

28-Sep-17 A

14-Dec-17 A

07-Mar-17

20-Sep-17

142

0

15-Mar-17 A

11-Jul-18 A

28-Aug-17 08-Jun-17

112 62

02-Apr-17 A 04-Apr-17 A

11-Mar-18 A 04-Dec-17 A

Safety DE6540

Instrument DE7060

Khatiyah Main Process DE3830

PROCESS PFDS (KAHM)

23-Mar-17 23-Mar-17

100%

0 0

DE3840

PROCESS P&IDS (KAHM)

17-Apr-17

03-Jul-17

62

100%

0

02-Apr-17 A

11-Mar-18 A

DE3850

PROCESS P&IDS (DEMOLITION) (KAHM)

17-Apr-17

03-Jul-17

62

100%

0

02-Apr-17 A

02-Jan-18 A

DE6800

PFD FOR FIRE WATER NETWORK (KAHM)

19-Apr-17

05-Jul-17

62

100%

0

19-Apr-17 A

04-Dec-17 A

DE3820

PROCESS LINE DESIGNATION TABLES (KAHM)

11-Jun-17

28-Aug-17

63

100%

0

08-Jul-17 A

24-Jan-18 A

EARLY TIE-IN VALVE LIST (KAHM)

07-Mar-17 07-Mar-17

18-Sep-17 22-May-17

140 62

100%

0 0

15-Mar-17 A 15-Mar-17 A

13-Apr-18 A 12-Jun-17 A

DE6950

PIPING EQUIPMENT LOCATION PLAN (KAHM)

29-Mar-17

13-Jun-17

62

100%

0

09-Apr-17 A

06-Mar-18 A

DE3970

PIPING PLOT PLANS (KAHM)

29-Mar-17

14-Jun-17

63

100%

0

15-Mar-17 A

21-Jan-18 A

DE4090

PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (KAHM)

14-May-17

03-Aug-17

68

100%

0

25-May-17 A

14-Nov-17 A

DE4120

PIPING KEY PLANS (KAHM)

25-May-17

10-Aug-17

63

100%

0

01-Jun-17 A

26-Nov-17 A

DE3990

PIPING G.A (KAHM)

30-May-17

15-Aug-17

63

100%

0

31-May-17 A

22-Mar-18 A

DE4110

PIPING STRESS ANALYSIS REPORT (KAHM)

30-May-17

15-Aug-17

63

100%

0

01-Jun-17 A

21-Jan-18 A

DE4000

PLOT PLANS (DEMOLITION) (KAHM)

04-Jun-17

21-Aug-17

64

100%

0

07-Jun-17 A

18-Oct-17 A

DE4130

PIPING MTOS (KAHM)

08-Jun-17

24-Aug-17

63

100%

0

08-Jul-17 A

10-Jan-18 A

Piping DE6880

TF

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:45

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 17 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Page 5 of32 Act. Fin / F-C Fin

DE3980

PIPING TIE-IN PACKAGES & SCHEDULES (KAHM)

15-Jun-17

14-Aug-17

48

100%

0

20-Jul-17 A

13-Apr-18 A

DE4140

PIPING CRITICAL LINE LIST (KAHM)

21-Jun-17

06-Sep-17

63

100%

0

21-Jun-17 A

29-Aug-17 A

DE4150

PIPING MTOS (DEMOLITION) (KAHM)

04-Jul-17

07-Aug-17

28

100%

0

05-May-17 A

10-Jan-18 A

DE4010

PIPING G.A (DEMOLITION) (KAHM)

09-Jul-17

18-Sep-17

59

100%

0

08-Jul-17 A

23-Nov-17 A

DE4080

PIPE SUPPORT LIST (KAHM)

27-Jul-17

18-Sep-17

43

100%

0

02-Oct-17 A

23-Jan-18 A

DE4100

PIPING ISOMETRICS (KAHM)

03-Aug-17

05-Sep-17

27

100%

0

31-Dec-17 A

01-Apr-18 A

17-Sep-17 02-Aug-17

115 95

14-Apr-17 A 14-Apr-17 A

26-Feb-18 A 05-Oct-17 A

ELECTRICAL CALCULATIONS (KAHM)

06-Apr-17 06-Apr-17

100%

0 0

DE3860

TIE-IN, CABLES & INTERCONNECTION SCHEDULES (KAHM)

14-May-17

17-Sep-17

101

100%

0

06-May-17 A

04-Dec-17 A

DE3880

ELECTRICAL ADEQUACY REORTS (KAHM)

18-May-17

03-Aug-17

62

100%

0

25-May-17 A

22-Nov-17 A

DE3870

SINGLE LINE DIAGRAMS (KAHM)

07-Jun-17

23-Aug-17

62

100%

0

07-May-17 A

24-Sep-17 A

DE4170

LIGHTING LAYOUT (KAHM)

29-Jun-17

14-Sep-17

62

100%

0

27-May-17 A

03-Aug-17 A

DE4190

EARTHING & CABLE ROUTING LAYOUTS (KAHM)

29-Jun-17

14-Sep-17

62

100%

0

17-Jun-17 A

02-Nov-17 A

DE4180

ELECTRICAL MTOS (KAHM)

09-Jul-17

10-Aug-17

27

100%

0

04-Jul-17 A

26-Feb-18 A

GRADING & ROAD LAYOUTS & DETAILS (KAHM)

26-Apr-17 26-Apr-17

15-Aug-17 13-Jul-17

80 64

100%

0 0

05-Apr-17 A 05-Apr-17 A

15-Apr-18 A 12-Feb-18 A

Electrical DE4160

Civil DE3930 DE7190

DRAINAGE LAYOUTS & DETAILS (KAHM)

27-Apr-17

13-Jul-17

62

100%

0

05-Apr-17 A

12-Feb-18 A

DE3940

PLATFORMS STRUCTURAL DETAILS (KAHM)

22-May-17

08-Aug-17

64

100%

0

01-Jun-17 A

08-Feb-18 A

DE3950

FOUNDATIONS GA, PLANS & DETAILS (KAHM)

22-May-17

15-Aug-17

70

100%

0

25-May-17 A

15-Apr-18 A

DE3960

PIPE SUPPORT LAYOUTS & SCHEDULES (KAHM)

22-May-17

31-Jul-17

57

100%

0

28-Nov-17 A

19-Dec-17 A

HAZARDOUS AREA SCHEDULES (KAHM)

18-May-17 18-May-17

15-Aug-17 03-Aug-17

63 62

100%

0 0

03-May-17 A 25-May-17 A

11-Jul-18 A 22-Mar-18 A

DE4030

HSE LAYOUTS (KAHM)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

11-Jul-18 A

DE4040

F&G AND PROCESS CAUSE & EFFECT CHARTS (KAHM)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

05-May-18 A

DE4050

HSE DATA SHEETS (KAHM)

18-May-17

15-Aug-17

71

100%

0

03-May-17 A

24-Jan-18 A

DE4060

HSE P&IDS (KAHM)

18-May-17

06-Aug-17

63

100%

0

04-May-17 A

11-Jan-18 A

DE7140

DEMOLITION PROCESS CAUSE & EFFECT CHARTS (KAHM)

29-May-17

14-Aug-17

62

100%

0

11-Jul-17 A

23-Aug-17 A

INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (KAHM)

20-Apr-17 20-Apr-17

20-Sep-17 15-Aug-17

110 95

100%

0 0

15-Mar-17 A 11-May-17 A

22-Feb-18 A 25-Jan-18 A

DE3890

INPUT/OUTPUT LISTS (DEMOLITION) (KAHM)

27-Apr-17

13-Jul-17

63

100%

0

15-Mar-17 A

26-Jul-17 A

DE4070

INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (KAHM)

27-Apr-17

10-Aug-17

86

100%

0

18-May-17 A

12-Oct-17 A

DE4200

INSTRUMENTS DATA SHEETS (KAHM)

01-May-17

08-Aug-17

81

100%

0

04-Apr-17 A

21-Dec-17 A

DE3910

INSTRUMENTS DIAGRAMS (KAHM)

04-May-17

20-Sep-17

113

100%

0

25-May-17 A

22-Feb-18 A

DE3900

INSTRUMENTS INDEX (KAHM)

30-May-17

15-Aug-17

62

100%

0

31-May-17 A

19-Oct-17 A

DE4210

INPUT/OUTPUT AND ALARM & TRIP LISTS (KAHM)

04-Jun-17

03-Sep-17

74

100%

0

07-Jun-17 A

10-Dec-17 A

DE3920

INSTRUMENTS SCOPE OF WORK (KAHM)

13-Jun-17

29-Aug-17

63

100%

0

08-Jul-17 A

19-Oct-17 A

DE4220

INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (KAHM)

22-Jun-17

12-Sep-17

65

100%

0

28-Jun-17 A

19-Oct-17 A

DE4230

INSTRUMENTS MTO (KAHM)

09-Aug-17

12-Sep-17

28

100%

0

28-Sep-17 A

14-Dec-17 A

07-Mar-17

20-Sep-17

142

0

14-Mar-17 A

11-Jul-18 A

PROCESS PFDS (KAHS)

23-Mar-17 23-Mar-17

29-Aug-17 08-Jun-17

113 62

100%

0 0

02-Apr-17 A 04-Apr-17 A

30-Jan-18 A 04-Dec-17 A

DE6810

PFD FOR FIRE WATER NETWORK (KAHS)

19-Apr-17

05-Jul-17

62

100%

0

19-Apr-17 A

04-Dec-17 A

DE4260

PROCESS P&IDS (KAHS)

20-Apr-17

06-Jul-17

62

100%

0

02-Apr-17 A

30-Jan-18 A

DE4270

PROCESS P&IDS (DEMOLITION) (KAHS)

20-Apr-17

06-Jul-17

62

100%

0

02-Apr-17 A

29-Nov-17 A

DE4240

PROCESS LINE DESIGNATION TABLES (KAHS)

13-Jun-17

29-Aug-17

62

100%

0

08-Jul-17 A

24-Jan-18 A

EARLY TIE-IN VALVE LIST (KAHS)

07-Mar-17 07-Mar-17

20-Sep-17 22-May-17

142 62

100%

0 0

14-Mar-17 A 15-Mar-17 A

13-Apr-18 A 12-Jun-17 A

DE6940

PIPING EQUIPMENT LOCATION PLAN (KAHS)

29-Mar-17

13-Jun-17

62

100%

0

09-Apr-17 A

21-Jan-18 A

DE4390

PIPING PLOT PLANS (KAHS)

02-Apr-17

15-Jun-17

62

100%

0

14-Mar-17 A

21-Jan-18 A

DE4510

PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (KAHS)

15-May-17

08-Aug-17

70

100%

0

25-May-17 A

24-Jan-18 A

DE4560

PIPING CRITICAL LINE LIST (KAHS)

22-May-17

07-Aug-17

63

100%

0

25-May-17 A

29-Aug-17 A

DE4530

PIPING STRESS ANALYSIS REPORT (KAHS)

08-Jun-17

24-Aug-17

63

100%

0

08-Jul-17 A

31-Jan-18 A

DE4550

PIPING MTOS (KAHS)

14-Jun-17

30-Aug-17

63

100%

0

08-Jul-17 A

10-Jan-18 A

DE4540

PIPING KEY PLANS (KAHS)

19-Jun-17

04-Sep-17

63

100%

0

22-Jun-17 A

28-Nov-17 A

DE4410

PIPING G.A (KAHS)

22-Jun-17

07-Sep-17

63

100%

0

28-Jun-17 A

18-Mar-18 A

DE4420

PLOT PLANS (DEMOLITION) (KAHS)

27-Jun-17

13-Sep-17

64

100%

0

28-Jun-17 A

03-Aug-17 A

DE4570

PIPING MTOS (DEMOLITION) (KAHS)

09-Jul-17

10-Aug-17

28

100%

0

05-May-17 A

10-Jan-18 A

Safety DE4020

Instrument DE7050

Khatiyah South Process DE4250

Piping DE6890

TF

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:45

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 18 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Page 6 of32 Act. Fin / F-C Fin

DE4400

PIPING TIE-IN PACKAGES & SCHEDULES (KAHS)

20-Jul-17

13-Sep-17

45

100%

0

27-Jul-17 A

13-Apr-18 A

DE4430

PIPING G.A (DEMOLITION) (KAHS)

27-Jul-17

20-Sep-17

45

100%

0

16-Aug-17 A

05-Dec-17 A

DE4500

PIPE SUPPORT LIST (KAHS)

27-Jul-17

18-Sep-17

43

100%

0

14-Oct-17 A

11-Jan-18 A

DE4520

PIPING ISOMETRICS (KAHS)

06-Aug-17

10-Sep-17

29

100%

0

02-Jan-18 A

01-Apr-18 A

ELECTRICAL CALCULATIONS (KAHS)

06-Apr-17 06-Apr-17

19-Sep-17 27-Jul-17

118 89

100%

0 0

14-Apr-17 A 14-Apr-17 A

26-Feb-18 A 28-Sep-17 A

DE4300

ELECTRICAL ADEQUACY REORTS (KAHS)

20-Apr-17

09-Jul-17

63

100%

0

25-May-17 A

20-Sep-17 A

DE4290

SINGLE LINE DIAGRAMS (KAHS)

04-Jun-17

17-Sep-17

84

100%

0

07-May-17 A

20-Sep-17 A

DE4280

TIE-IN, CABLES & INTERCONNECTION SCHEDULES (KAHS)

14-Jun-17

14-Sep-17

74

100%

0

04-May-17 A

25-Sep-17 A

DE4610

EARTHING & CABLE ROUTING LAYOUTS (KAHS)

22-Jun-17

19-Sep-17

71

100%

0

17-Jun-17 A

08-Nov-17 A

DE4590

LIGHTING LAYOUT (KAHS)

29-Jun-17

14-Sep-17

62

100%

0

25-May-17 A

03-Aug-17 A

DE4600

ELECTRICAL MTOS (KAHS)

09-Jul-17

10-Aug-17

27

100%

0

04-Jul-17 A

26-Feb-18 A

GRADING & ROAD LAYOUTS & DETAILS (KAHS)

03-May-17 03-May-17

29-Aug-17 20-Jul-17

85 64

100%

0 0

22-Mar-17 A 22-Mar-17 A

12-Mar-18 A 20-Jan-18 A

DE7200

DRAINAGE LAYOUTS & DETAILS (KAHS)

03-May-17

20-Jul-17

64

100%

0

22-Mar-17 A

04-Feb-18 A

DE4360

PLATFORMS STRUCTURAL DETAILS (KAHS)

13-Jun-17

29-Aug-17

63

100%

0

08-Jul-17 A

12-Feb-18 A

DE4370

FOUNDATIONS GA, PLANS & DETAILS (KAHS)

13-Jun-17

29-Aug-17

63

100%

0

08-Jul-17 A

12-Mar-18 A

DE4380

PIPE SUPPORT LAYOUTS & SCHEDULES (KAHS)

13-Jun-17

29-Aug-17

63

100%

0

28-Nov-17 A

19-Dec-17 A

HAZARDOUS AREA SCHEDULES (KAHS)

18-May-17 18-May-17

20-Aug-17 03-Aug-17

66 62

100%

0 0

03-May-17 A 25-May-17 A

11-Jul-18 A 22-Mar-18 A

DE4460

F&G AND PROCESS CAUSE & EFFECT CHARTS (KAHS)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

05-May-18 A

DE4450

HSE LAYOUTS (KAHS)

23-May-17

08-Aug-17

62

100%

0

25-May-17 A

11-Jul-18 A

DE4470

HSE DATA SHEETS (KAHS)

23-May-17

20-Aug-17

71

100%

0

03-May-17 A

24-Jan-18 A

DE4480

HSE P&IDS (KAHS)

23-May-17

09-Aug-17

63

100%

0

04-May-17 A

11-Jan-18 A

20-Sep-17 15-Aug-17

110 95

100%

0 0

21-Mar-17 A 11-May-17 A

26-Feb-18 A 25-Jan-18 A

10-Aug-17

86

100%

0

18-May-17 A

19-Oct-17 A

Electrical DE4580

Civil DE4350

Safety DE4440

INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (KAHS)

20-Apr-17 20-Apr-17

DE4490

INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (KAHS)

27-Apr-17

DE4310

INPUT/OUTPUT LISTS (DEMOLITION) (KAHS)

27-Apr-17

13-Jul-17

63

100%

0

21-Mar-17 A

20-Jun-17 A

DE4620

INSTRUMENTS DATA SHEETS (KAHS)

01-May-17

08-Aug-17

81

100%

0

04-Apr-17 A

21-Dec-17 A

DE4330

INSTRUMENTS DIAGRAMS (KAHS)

04-May-17

20-Sep-17

113

100%

0

25-May-17 A

26-Feb-18 A

DE4320

INSTRUMENTS INDEX (KAHS)

30-May-17

14-Aug-17

62

100%

0

31-May-17 A

19-Oct-17 A

DE4630

INPUT/OUTPUT AND ALARM & TRIP LISTS (KAHS)

04-Jun-17

03-Sep-17

74

100%

0

07-Jun-17 A

10-Dec-17 A

DE4340

INSTRUMENTS SCOPE OF WORK (KAHS)

13-Jun-17

29-Aug-17

63

100%

0

08-Jul-17 A

19-Oct-17 A

DE4640

INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (KAHS)

25-Jun-17

12-Sep-17

65

100%

0

28-Jun-17 A

19-Oct-17 A

DE4650

INSTRUMENTS MTO (KAHS)

09-Aug-17

12-Sep-17

28

100%

0

28-Sep-17 A

13-Dec-17 A

23-Mar-17

20-Sep-17

130

27

15-Mar-17 A

02-Dec-18

20-Aug-17 08-Jun-17

106 62

02-Apr-17 A 04-Apr-17 A

11-Mar-18 A 14-Dec-17 A 14-Dec-17 A

Instrument DE7070

Fahahil North PROCESS PFDS (FAHN)

23-Mar-17 23-Mar-17

100%

0 0

DE6820

PFD FOR FIRE WATER NETWORK (FAHN)

19-Apr-17

05-Jul-17

62

100%

0

05-Apr-17 A

DE4690

PROCESS P&IDS (DEMOLITION) (FAHN)

27-Apr-17

13-Jul-17

62

100%

0

03-May-17 A

03-Jan-18 A

DE4680

PROCESS P&IDS (FAHN)

27-Apr-17

13-Jul-17

62

100%

0

02-Apr-17 A

11-Mar-18 A

DE4660

PROCESS LINE DESIGNATION TABLES (FAHN)

04-Jun-17

20-Aug-17

62

100%

0

07-Jun-17 A

24-Jan-18 A

PIPING PLOT PLANS (FAHN)

23-Mar-17 23-Mar-17

20-Sep-17 08-Jun-17

130 63

100%

27 0

29-Mar-17 A 29-Mar-17 A

02-Dec-18 21-Jan-18 A

Process DE4670

Piping DE4810 DE6930

PIPING EQUIPMENT LOCATION PLAN (FAHN)

29-Mar-17

13-Jun-17

62

100%

0

09-Apr-17 A

21-Jan-18 A

DE4930

PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (FAHN)

22-May-17

15-Aug-17

70

100%

0

25-May-17 A

05-Nov-17 A

DE4840

PLOT PLANS (DEMOLITION) (FAHN)

29-May-17

14-Aug-17

63

100%

0

01-Jun-17 A

18-Oct-17 A

DE4970

PIPING MTOS (FAHN)

30-May-17

15-Aug-17

63

100%

0

01-Jun-17 A

10-Jan-18 A

DE4950

PIPING STRESS ANALYSIS REPORT (FAHN)

15-Jun-17

19-Jul-17

28

100%

0

21-Jun-17 A

07-Feb-18 A

DE4980

PIPING CRITICAL LINE LIST (FAHN)

15-Jun-17

11-Sep-17

71

100%

0

21-Jun-17 A

29-Aug-17 A

DE4990

PIPING MTOS (DEMOLITION) (FAHN)

26-Jun-17

30-Jul-17

28

100%

0

01-Jun-17 A

10-Jan-18 A

DE4850

PIPING G.A (DEMOLITION) (FAHN)

16-Jul-17

19-Sep-17

54

100%

0

15-Jul-17 A

16-Oct-17 A

DE4920

PIPE SUPPORT LIST (FAHN)

17-Jul-17

10-Sep-17

45

100%

0

15-Jul-17 A

21-Jan-18 A

DE4960

PIPING KEY PLANS (FAHN)

20-Jul-17

13-Sep-17

45

100%

0

27-Jul-17 A

21-Jan-18 A

DE4820

PIPING TIE-IN PACKAGES & SCHEDULES (FAHN)

20-Jul-17

17-Sep-17

47

95%

27

27-Jul-17 A

02-Dec-18

DE4830

PIPING G.A (FAHN)

03-Aug-17

20-Sep-17

39

100%

0

19-Oct-17 A

18-Mar-18 A

DE4940

PIPING ISOMETRICS (FAHN)

10-Aug-17

19-Sep-17

33

100%

0

18-Jan-18 A

01-Apr-18 A

TF

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:45

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

166

166

166

Page 19 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

Electrical DE5000

ELECTRICAL CALCULATIONS (FAHN)

U3963- Updated Revised Baseline Schedule.

Page 7 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

23-Apr-17 23-Apr-17

17-Aug-17 10-Aug-17

84 89

100%

0 0

14-Apr-17 A 14-Apr-17 A

07-Dec-17 A 28-Sep-17 A

DE4700

TIE-IN, CABLES & INTERCONNECTION SCHEDULES (FAHN)

23-Apr-17

24-Jul-17

74

100%

0

25-Apr-17 A

07-Dec-17 A

DE5010

LIGHTING LAYOUT (FAHN)

02-May-17

19-Jul-17

63

100%

0

22-May-17 A

03-Aug-17 A

DE4720

ELECTRICAL ADEQUACY REORTS (FAHN)

07-May-17

23-Jul-17

62

100%

0

25-May-17 A

19-Oct-17 A

DE4710

SINGLE LINE DIAGRAMS (FAHN)

09-May-17

26-Jul-17

63

100%

0

07-May-17 A

24-Sep-17 A

DE5030

EARTHING & CABLE ROUTING LAYOUTS (FAHN)

01-Jun-17

17-Aug-17

62

100%

0

07-Jun-17 A

04-Dec-17 A

DE5020

ELECTRICAL MTOS (FAHN)

09-Jul-17

10-Aug-17

27

100%

0

04-Jul-17 A

01-Oct-17 A

05-Sep-17 27-Jul-17

84 63

25-May-17 A 25-May-17 A

19-Mar-18 A 05-Mar-18 A

DRAINAGE LAYOUTS & DETAILS (FAHN)

11-May-17 11-May-17

100%

0 0

DE4770

GRADING & ROAD LAYOUTS & DETAILS (FAHN)

11-May-17

27-Jul-17

63

100%

0

25-May-17 A

18-Feb-18 A

DE4780

PLATFORMS STRUCTURAL DETAILS (FAHN)

20-Jun-17

05-Sep-17

63

100%

0

21-Jun-17 A

18-Mar-18 A

DE4790

FOUNDATIONS GA, PLANS & DETAILS (FAHN)

20-Jun-17

05-Sep-17

63

100%

0

21-Jun-17 A

19-Mar-18 A

DE4800

PIPE SUPPORT LAYOUTS & SCHEDULES (FAHN)

20-Jun-17

05-Sep-17

63

100%

0

21-Jun-17 A

05-Mar-18 A

HAZARDOUS AREA SCHEDULES (FAHN)

18-May-17 18-May-17

15-Aug-17 03-Aug-17

63 62

100%

0 0

03-May-17 A 25-May-17 A

08-Jul-18 A 22-Mar-18 A

DE4870

HSE LAYOUTS (FAHN)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

08-Jul-18 A

DE4880

F&G AND PROCESS CAUSE & EFFECT CHARTS (FAHN)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

05-May-18 A

DE4890

HSE DATA SHEETS (FAHN)

18-May-17

15-Aug-17

71

100%

0

03-May-17 A

24-Jan-18 A

DE4900

HSE P&IDS (FAHN)

18-May-17

06-Aug-17

63

100%

0

03-May-17 A

11-Jan-18 A

DE7150

DEMOLITION PROCESS CAUSE & EFFECT CHARTS (FAHN)

29-May-17

14-Aug-17

62

100%

0

11-Jul-17 A

23-Aug-17 A

INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (FAHN)

20-Apr-17 20-Apr-17

20-Sep-17 15-Aug-17

110 95

100%

0 0

15-Mar-17 A 11-May-17 A

12-Mar-18 A 25-Jan-18 A

Civil DE7210

Safety DE4860

Instrument DE7020 DE4910

INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (FAHN)

27-Apr-17

10-Aug-17

86

100%

0

18-May-17 A

10-Oct-17 A

DE5040

INSTRUMENTS DATA SHEETS (FAHN)

01-May-17

08-Aug-17

81

100%

0

04-Apr-17 A

26-Dec-17 A

DE4750

INSTRUMENTS DIAGRAMS (FAHN)

04-May-17

20-Sep-17

113

100%

0

25-May-17 A

12-Mar-18 A

DE7080

INSTRUMENTS BUILDING LAYOUT (FAHN)

16-May-17

01-Aug-17

63

100%

0

17-May-17 A

25-Jul-17 A

DE4740

INSTRUMENTS INDEX (FAHN)

30-May-17

14-Aug-17

62

100%

0

31-May-17 A

20-Nov-17 A

DE5050

INPUT/OUTPUT AND ALARM & TRIP LISTS (FAHN)

04-Jun-17

03-Sep-17

74

100%

0

08-Jun-17 A

10-Dec-17 A

DE4760

INSTRUMENTS SCOPE OF WORK (FAHN)

13-Jun-17

29-Aug-17

63

100%

0

08-Jul-17 A

19-Oct-17 A

DE4730

INPUT/OUTPUT LISTS (DEMOLITION) (FAHN)

15-Jun-17

14-Aug-17

48

100%

0

15-Mar-17 A

26-Jul-17 A

DE5060

INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (FAHN)

25-Jun-17

12-Sep-17

65

100%

0

28-Jun-17 A

19-Oct-17 A

DE5070

INSTRUMENTS MTO (FAHN)

09-Aug-17

12-Sep-17

28

100%

0

28-Sep-17 A

14-Dec-17 A

23-Mar-17

20-Sep-17

130

27

15-Mar-17 A

02-Dec-18

PROCESS PFDS (FAHM)

23-Mar-17 23-Mar-17

16-Aug-17 08-Jun-17

104 62

100%

0 0

02-Apr-17 A 04-Apr-17 A

11-Mar-18 A 04-Dec-17 A

DE6830

PFD FOR FIRE WATER NETWORK (FAHM)

19-Apr-17

05-Jul-17

62

100%

0

19-Apr-17 A

04-Dec-17 A

DE5940

PROCESS P&IDS (FAHM)

20-Apr-17

06-Jul-17

62

100%

0

02-Apr-17 A

11-Mar-18 A

DE5950

PROCESS P&IDS (DEMOLITION) (FAHM)

20-Apr-17

06-Jul-17

62

100%

0

27-Apr-17 A

02-Jan-18 A

DE5920

PROCESS LINE DESIGNATION TABLES (FAHM)

30-May-17

16-Aug-17

63

100%

0

31-May-17 A

24-Jan-18 A

PIPING EQUIPMENT LOCATION PLAN (FAHM)

29-Mar-17 29-Mar-17

20-Sep-17 13-Jun-17

126 62

100%

27 0

15-Mar-17 A 09-Apr-17 A

02-Dec-18 25-Jan-18 A

Fahahil Main Process DE5930

Piping DE6920 DE6070

PIPING PLOT PLANS (FAHM)

29-Mar-17

14-Jun-17

63

100%

0

29-Mar-17 A

25-Jan-18 A

DE6190

PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (FAHM)

18-May-17

20-Sep-17

101

100%

0

25-May-17 A

26-Oct-17 A

DE6100

PLOT PLANS (DEMOLITION) (FAHM)

21-May-17

03-Aug-17

62

100%

0

25-May-17 A

18-Oct-17 A

DE6230

PIPING MTOS (FAHM)

15-Jun-17

19-Jul-17

28

100%

0

22-Jun-17 A

10-Jan-18 A

DE6240

PIPING CRITICAL LINE LIST (FAHM)

15-Jun-17

31-Aug-17

63

100%

0

22-Jun-17 A

14-Sep-17 A

DE6220

PIPING KEY PLANS (FAHM)

19-Jun-17

04-Sep-17

63

100%

0

15-Mar-17 A

21-Jan-18 A

DE6090

PIPING G.A (FAHM)

20-Jun-17

29-Aug-17

57

100%

0

19-Oct-17 A

18-Mar-18 A

DE6210

PIPING STRESS ANALYSIS REPORT (FAHM)

29-Jun-17

02-Aug-17

28

100%

0

03-Jul-17 A

29-Jan-18 A

DE6250

PIPING MTOS (DEMOLITION) (FAHM)

29-Jun-17

02-Aug-17

28

100%

0

22-Jul-17 A

10-Jan-18 A

DE6110

PIPING G.A (DEMOLITION) (FAHM)

09-Jul-17

18-Sep-17

59

100%

0

08-Jul-17 A

13-Nov-17 A

DE6080

PIPING TIE-IN PACKAGES & SCHEDULES (FAHM)

25-Jul-17

17-Sep-17

44

90%

27

15-Jul-17 A

02-Dec-18

DE6180

PIPE SUPPORT LIST (FAHM)

27-Jul-17

18-Sep-17

43

100%

0

02-Oct-17 A

21-Jan-18 A

DE6200

PIPING ISOMETRICS (FAHM)

14-Aug-17

17-Sep-17

28

100%

0

18-Jan-18 A

01-Apr-18 A

TIE-IN, CABLES & INTERCONNECTION SCHEDULES (FAHM)

13-Apr-17 13-Apr-17

10-Aug-17 17-Jul-17

85 77

100%

0 0

14-Apr-17 A 19-Apr-17 A

09-Jan-18 A 20-Sep-17 A

Electrical DE5960

TF

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

166

166

166

Page 20 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Page 8 of32

Act.Start / F-C Start

Act. Fin / F-C Fin

DE6260

ELECTRICAL CALCULATIONS (FAHM)

16-Apr-17

09-Jul-17

68

100%

0

14-Apr-17 A

19-Sep-17 A

DE5980

ELECTRICAL ADEQUACY REORTS (FAHM)

19-Apr-17

28-Jun-17

57

100%

0

25-May-17 A

24-Sep-17 A

DE5970

SINGLE LINE DIAGRAMS (FAHM)

02-May-17

18-Jul-17

63

100%

0

07-May-17 A

20-Sep-17 A

DE6270

LIGHTING LAYOUT (FAHM)

02-May-17

18-Jul-17

62

100%

0

21-May-17 A

03-Aug-17 A

DE6290

EARTHING & CABLE ROUTING LAYOUTS (FAHM)

02-May-17

18-Jul-17

62

100%

0

25-May-17 A

09-Jan-18 A

DE6280

ELECTRICAL MTOS (FAHM)

09-Jul-17

10-Aug-17

27

100%

0

04-Jul-17 A

28-Sep-17 A

DRAINAGE LAYOUTS & DETAILS (FAHM)

16-May-17 16-May-17

19-Sep-17 01-Aug-17

91 63

100%

0 0

25-May-17 A 25-May-17 A

29-Apr-18 A 05-Mar-18 A

DE6030

GRADING & ROAD LAYOUTS & DETAILS (FAHM)

16-May-17

01-Aug-17

63

100%

0

25-May-17 A

21-Feb-18 A

DE6050

FOUNDATIONS GA, PLANS & DETAILS (FAHM)

04-Jul-17

19-Sep-17

63

100%

0

03-Jul-17 A

05-Apr-18 A

DE6060

PIPE SUPPORT LAYOUTS & SCHEDULES (FAHM)

04-Jul-17

19-Sep-17

63

100%

0

04-Jul-17 A

05-Mar-18 A

DE6040

PLATFORMS STRUCTURAL DETAILS (FAHM)

04-Jul-17

19-Sep-17

63

100%

0

04-Jul-17 A

29-Apr-18 A

20-Aug-17 03-Aug-17

66 62

03-May-17 A 25-May-17 A

05-May-18 A 22-Mar-18 A

Civil DE7220

HAZARDOUS AREA SCHEDULES (FAHM)

18-May-17 18-May-17

100%

0 0

DE6140

F&G AND PROCESS CAUSE & EFFECT CHARTS (FAHM)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

05-May-18 A

DE6130

HSE LAYOUTS (FAHM)

23-May-17

08-Aug-17

62

100%

0

25-May-17 A

31-Jan-18 A

DE6150

HSE DATA SHEETS (FAHM)

23-May-17

20-Aug-17

71

100%

0

03-May-17 A

24-Jan-18 A

DE6160

HSE P&IDS (FAHM)

23-May-17

09-Aug-17

63

100%

0

03-May-17 A

11-Jan-18 A

DE7160

DEMOLITION PROCESS CAUSE & EFFECT CHARTS (FAHM)

29-May-17

14-Aug-17

62

100%

0

11-Jul-17 A

23-Aug-17 A

INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (FAHM)

20-Apr-17 20-Apr-17

20-Sep-17 15-Aug-17

110 95

100%

0 0

22-Mar-17 A 11-May-17 A

22-Mar-18 A 25-Jan-18 A

DE5990

INPUT/OUTPUT LISTS (DEMOLITION) (FAHM)

27-Apr-17

13-Jul-17

63

100%

0

22-Mar-17 A

14-Jun-17 A

DE6170

INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (FAHM)

27-Apr-17

10-Aug-17

86

100%

0

18-May-17 A

12-Oct-17 A

DE6300

INSTRUMENTS DATA SHEETS (FAHM)

01-May-17

08-Aug-17

81

100%

0

04-Apr-17 A

26-Dec-17 A

DE6010

INSTRUMENTS DIAGRAMS (FAHM)

04-May-17

20-Sep-17

113

100%

0

25-May-17 A

22-Mar-18 A

DE7090

INSTRUMENTS BUILDING LAYOUT (FAHM)

16-May-17

01-Aug-17

63

100%

0

15-May-17 A

25-Jul-17 A

DE6000

INSTRUMENTS INDEX (FAHM)

30-May-17

14-Aug-17

62

100%

0

31-May-17 A

05-Oct-17 A

DE6310

INPUT/OUTPUT AND ALARM & TRIP LISTS (FAHM)

04-Jun-17

03-Sep-17

74

100%

0

08-Jun-17 A

10-Dec-17 A

DE6020

INSTRUMENTS SCOPE OF WORK (FAHM)

13-Jun-17

29-Aug-17

63

100%

0

11-Jul-17 A

19-Oct-17 A

DE6320

INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (FAHM)

25-Jun-17

12-Sep-17

65

100%

0

28-Jun-17 A

29-Nov-17 A

DE6330

INSTRUMENTS MTO (FAHM)

09-Aug-17

12-Sep-17

28

100%

0

28-Sep-17 A

14-Dec-17 A

23-Mar-17

20-Sep-17

130

27

21-Mar-17 A

02-Dec-18

16-Aug-17 08-Jun-17

104 62

04-Apr-17 A 04-Apr-17 A

11-Mar-18 A 04-Dec-17 A

Safety DE6120

Instrument DE7010

Fahahil South PROCESS PFDS (FAHS)

23-Mar-17 23-Mar-17

100%

0 0

DE6840

PFD FOR FIRE WATER NETWORK (FAHS)

19-Apr-17

05-Jul-17

62

100%

0

19-Apr-17 A

04-Dec-17 A

DE5520

PROCESS P&IDS (FAHS)

27-Apr-17

13-Jul-17

62

100%

0

03-May-17 A

11-Mar-18 A

DE5530

PROCESS P&IDS (DEMOLITION) (FAHS)

27-Apr-17

13-Jul-17

62

100%

0

03-May-17 A

05-Oct-17 A

DE5500

PROCESS LINE DESIGNATION TABLES (FAHS)

30-May-17

16-Aug-17

63

100%

0

01-Jun-17 A

24-Jan-18 A

PIPING EQUIPMENT LOCATION PLAN (FAHS)

29-Mar-17 29-Mar-17

19-Sep-17 13-Jun-17

125 62

100%

27 0

29-Mar-17 A 09-Apr-17 A

02-Dec-18 21-Jan-18 A

DE5650

PIPING PLOT PLANS (FAHS)

29-Mar-17

14-Jun-17

63

100%

0

29-Mar-17 A

21-Jan-18 A

DE5770

PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (FAHS)

18-May-17

10-Aug-17

69

100%

0

25-May-17 A

29-Aug-17 A

DE5810

PIPING MTOS (FAHS)

01-Jun-17

17-Aug-17

63

100%

0

07-Jun-17 A

10-Jan-18 A

DE5680

PLOT PLANS (DEMOLITION) (FAHS)

11-Jun-17

27-Aug-17

63

100%

0

08-Jul-17 A

18-Oct-17 A

DE5820

PIPING CRITICAL LINE LIST (FAHS)

14-Jun-17

31-Aug-17

64

100%

0

21-Jun-17 A

14-Sep-17 A

DE5790

PIPING STRESS ANALYSIS REPORT (FAHS)

22-Jun-17

27-Jul-17

29

100%

0

29-Jun-17 A

14-Feb-18 A

DE5830

PIPING MTOS (DEMOLITION) (FAHS)

02-Jul-17

03-Aug-17

28

100%

0

07-Jun-17 A

10-Jan-18 A

DE5690

PIPING G.A (DEMOLITION) (FAHS)

20-Jul-17

13-Sep-17

45

100%

0

27-Jul-17 A

18-Oct-17 A

DE5760

PIPE SUPPORT LIST (FAHS)

20-Jul-17

13-Sep-17

45

100%

0

27-Jul-17 A

11-Jan-18 A

DE5800

PIPING KEY PLANS (FAHS)

20-Jul-17

13-Sep-17

45

100%

0

27-Jul-17 A

26-Nov-17 A

DE5660

PIPING TIE-IN PACKAGES & SCHEDULES (FAHS)

23-Jul-17

14-Sep-17

45

90%

27

16-Jul-17 A

02-Dec-18

DE5670

PIPING G.A (FAHS)

30-Jul-17

14-Sep-17

39

100%

0

12-Oct-17 A

18-Mar-18 A

DE5780

PIPING ISOMETRICS (FAHS)

16-Aug-17

19-Sep-17

28

100%

0

18-Jan-18 A

08-Apr-18 A

TIE-IN, CABLES & INTERCONNECTION SCHEDULES (FAHS)

30-Apr-17 30-Apr-17

24-Aug-17 02-Aug-17

84 77

100%

0 0

14-Apr-17 A 25-Apr-17 A

07-Dec-17 A 07-Dec-17 A

Process DE5510

Piping DE6910

Electrical DE5540 DE5840

ELECTRICAL CALCULATIONS (FAHS)

30-Apr-17

23-Jul-17

68

100%

0

14-Apr-17 A

28-Sep-17 A

DE5560

ELECTRICAL ADEQUACY REORTS (FAHS)

14-May-17

30-Jul-17

62

100%

0

25-May-17 A

07-Dec-17 A

TF

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

166

166

166

Page 21 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule.

Page 9 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

DE5550

SINGLE LINE DIAGRAMS (FAHS)

17-May-17

02-Aug-17

62

100%

0

07-May-17 A

24-Sep-17 A

DE5850

LIGHTING LAYOUT (FAHS)

08-Jun-17

24-Aug-17

62

100%

0

27-May-17 A

03-Aug-17 A

DE5870

EARTHING & CABLE ROUTING LAYOUTS (FAHS)

08-Jun-17

24-Aug-17

62

100%

0

17-Jun-17 A

08-Nov-17 A

DE5860

ELECTRICAL MTOS (FAHS)

09-Jul-17

10-Aug-17

27

100%

0

04-Jul-17 A

02-Oct-17 A

DRAINAGE LAYOUTS & DETAILS (FAHS)

24-May-17 24-May-17

18-Sep-17 08-Aug-17

84 62

100%

0 0

25-May-17 A 25-May-17 A

23-Apr-18 A 11-Apr-18 A

DE5610

GRADING & ROAD LAYOUTS & DETAILS (FAHS)

24-May-17

08-Aug-17

62

100%

0

25-May-17 A

05-Apr-18 A

DE5620

PLATFORMS STRUCTURAL DETAILS (FAHS)

09-Jul-17

18-Sep-17

59

100%

0

08-Jul-17 A

13-Mar-18 A

DE5630

FOUNDATIONS GA, PLANS & DETAILS (FAHS)

09-Jul-17

18-Sep-17

59

100%

0

08-Jul-17 A

23-Apr-18 A

DE5640

PIPE SUPPORT LAYOUTS & SCHEDULES (FAHS)

09-Jul-17

18-Sep-17

59

100%

0

08-Jul-17 A

11-Apr-18 A

HAZARDOUS AREA SCHEDULES (FAHS)

18-May-17 18-May-17

15-Aug-17 03-Aug-17

63 62

100%

0 0

03-May-17 A 25-May-17 A

12-Jul-18 A 22-Mar-18 A

DE5710

HSE LAYOUTS (FAHS)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

12-Jul-18 A

DE5720

F&G AND PROCESS CAUSE & EFFECT CHARTS (FAHS)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

05-May-18 A

DE5730

HSE DATA SHEETS (FAHS)

18-May-17

15-Aug-17

71

100%

0

03-May-17 A

24-Jan-18 A

DE5740

HSE P&IDS (FAHS)

18-May-17

06-Aug-17

63

100%

0

04-May-17 A

11-Jan-18 A

20-Sep-17 15-Aug-17

110 95

21-Mar-17 A 11-May-17 A

18-Mar-18 A 25-Jan-18 A

Civil DE7230

Safety DE5700

INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (FAHS)

20-Apr-17 20-Apr-17

100%

0 0

DE5570

INPUT/OUTPUT LISTS (DEMOLITION) (FAHS)

27-Apr-17

13-Jul-17

63

100%

0

21-Mar-17 A

26-Jul-17 A

DE5750

INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (FAHS)

27-Apr-17

10-Aug-17

86

100%

0

18-May-17 A

10-Oct-17 A

DE5880

INSTRUMENTS DATA SHEETS (FAHS)

01-May-17

08-Aug-17

81

100%

0

04-Apr-17 A

26-Dec-17 A

DE5590

INSTRUMENTS DIAGRAMS (FAHS)

04-May-17

20-Sep-17

113

100%

0

25-May-17 A

18-Mar-18 A

DE7100

INSTRUMENTS BUILDING LAYOUT (FAHS)

16-May-17

01-Aug-17

63

100%

0

15-May-17 A

25-Jul-17 A

DE5580

INSTRUMENTS INDEX (FAHS)

30-May-17

14-Aug-17

62

100%

0

31-May-17 A

19-Oct-17 A

DE5890

INPUT/OUTPUT AND ALARM & TRIP LISTS (FAHS)

04-Jun-17

03-Sep-17

74

100%

0

08-Jun-17 A

10-Dec-17 A

DE5600

INSTRUMENTS SCOPE OF WORK (FAHS)

13-Jun-17

29-Aug-17

63

100%

0

13-Jul-17 A

19-Oct-17 A

DE5900

INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (FAHS)

25-Jun-17

12-Sep-17

65

100%

0

29-Jun-17 A

19-Oct-17 A

DE5910

INSTRUMENTS MTO (FAHS)

09-Aug-17

12-Sep-17

28

100%

0

28-Sep-17 A

13-Dec-17 A

23-Mar-17

20-Sep-17

130

27

15-Mar-17 A

02-Dec-18

PROCESS PFDS (JALM)

23-Mar-17 23-Mar-17

20-Aug-17 08-Jun-17

106 62

100%

0 0

04-Apr-17 A 04-Apr-17 A

11-Mar-18 A 04-Dec-17 A

DE6850

PFD FOR FIRE WATER NETWORK (JALM)

19-Apr-17

05-Jul-17

62

100%

0

19-Apr-17 A

04-Dec-17 A

DE5100

PROCESS P&IDS (JALM)

27-Apr-17

13-Jul-17

62

100%

0

03-May-17 A

11-Mar-18 A

DE5110

PROCESS P&IDS (DEMOLITION) (JALM)

27-Apr-17

13-Jul-17

62

100%

0

03-May-17 A

02-Jan-18 A

DE5080

PROCESS LINE DESIGNATION TABLES (JALM)

04-Jun-17

20-Aug-17

62

100%

0

07-Jun-17 A

24-Jan-18 A

PIPING EQUIPMENT LOCATION PLAN (JALM)

29-Mar-17 29-Mar-17

20-Sep-17 13-Jun-17

126 62

100%

27 0

05-Apr-17 A 09-Apr-17 A

02-Dec-18 04-Mar-18 A

Instrument DE7030

Jaleha Main Process DE5090

Piping DE6900 DE5230

PIPING PLOT PLANS (JALM)

02-Apr-17

15-Jun-17

62

100%

0

05-Apr-17 A

04-Mar-18 A

DE5350

PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (JALM)

21-May-17

20-Aug-17

74

100%

0

25-May-17 A

02-Nov-17 A

DE5390

PIPING MTOS (JALM)

05-Jun-17

20-Aug-17

62

100%

0

07-Jun-17 A

10-Jan-18 A

DE5400

PIPING CRITICAL LINE LIST (JALM)

14-Jun-17

31-Aug-17

64

100%

0

21-Jun-17 A

14-Sep-17 A

DE5260

PLOT PLANS (DEMOLITION) (JALM)

18-Jun-17

03-Sep-17

63

100%

0

22-Jun-17 A

18-Oct-17 A

DE5370

PIPING STRESS ANALYSIS REPORT (JALM)

04-Jul-17

07-Aug-17

28

100%

0

03-Jul-17 A

26-Feb-18 A

DE5250

PIPING G.A (JALM)

10-Jul-17

20-Sep-17

60

100%

0

08-Jul-17 A

22-Mar-18 A

DE5410

PIPING MTOS (DEMOLITION) (JALM)

12-Jul-17

15-Aug-17

28

100%

0

07-Jun-17 A

10-Jan-18 A

DE5270

PIPING G.A (DEMOLITION) (JALM)

24-Jul-17

17-Sep-17

44

100%

0

27-Jul-17 A

09-Nov-17 A

DE5340

PIPE SUPPORT LIST (JALM)

24-Jul-17

14-Sep-17

43

100%

0

27-Jul-17 A

22-Jan-18 A

DE5240

PIPING TIE-IN PACKAGES & SCHEDULES (JALM)

30-Jul-17

19-Sep-17

43

85%

27

04-Aug-17 A

02-Dec-18

DE5380

PIPING KEY PLANS (JALM)

30-Jul-17

14-Sep-17

39

100%

0

01-Aug-17 A

26-Nov-17 A

DE5360

PIPING ISOMETRICS (JALM)

20-Aug-17

20-Sep-17

27

100%

0

18-Jan-18 A

22-Feb-18 A

ELECTRICAL CALCULATIONS (JALM)

30-Mar-17 30-Mar-17

13-Sep-17 24-Jul-17

119 92

100%

0 0

14-Apr-17 A 14-Apr-17 A

26-Feb-18 A 01-Oct-17 A

DE5120

TIE-IN, CABLES & INTERCONNECTION SCHEDULES (JALM)

07-May-17

13-Sep-17

105

100%

0

04-May-17 A

25-Sep-17 A

DE5140

ELECTRICAL ADEQUACY REORTS (JALM)

14-May-17

30-Jul-17

62

100%

0

25-May-17 A

24-Sep-17 A

DE5130

SINGLE LINE DIAGRAMS (JALM)

24-May-17

09-Aug-17

62

100%

0

07-May-17 A

19-Sep-17 A

DE5430

LIGHTING LAYOUT (JALM)

15-Jun-17

31-Aug-17

62

100%

0

21-May-17 A

03-Aug-17 A

DE5450

EARTHING & CABLE ROUTING LAYOUTS (JALM)

18-Jun-17

03-Sep-17

62

100%

0

18-Jun-17 A

08-Nov-17 A

Electrical DE5420

TF

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

166

166

166

Page 22 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

ELECTRICAL MTOS (JALM)

09-Jul-17

10-Aug-17

27

100%

DRAINAGE LAYOUTS & DETAILS (JALM)

06-Jun-17 06-Jun-17

18-Sep-17 22-Aug-17

75 63

DE5190

GRADING & ROAD LAYOUTS & DETAILS (JALM)

06-Jun-17

22-Aug-17

DE5200

PLATFORMS STRUCTURAL DETAILS (JALM)

09-Jul-17

18-Sep-17

DE5210

FOUNDATIONS GA, PLANS & DETAILS (JALM)

09-Jul-17

DE5220

PIPE SUPPORT LAYOUTS & SCHEDULES (JALM)

DE5440 Civil DE7240

Page 10 of32

Act.Start / F-C Start

Act. Fin / F-C Fin

0

04-Jul-17 A

26-Feb-18 A

100%

0 0

07-Jun-17 A 07-Jun-17 A

24-Sep-18 A 24-Sep-18 A

63

100%

0

07-Jun-17 A

24-Sep-18 A

59

100%

0

08-Jul-17 A

01-May-18 A

18-Sep-17

59

100%

0

08-Jul-17 A

28-Jun-18 A

TF

09-Jul-17

18-Sep-17

59

100%

0

08-Jul-17 A

24-Sep-18 A

HAZARDOUS AREA SCHEDULES (JALM)

18-May-17 18-May-17

15-Aug-17 03-Aug-17

63 62

100%

0 0

03-May-17 A 25-May-17 A

11-Jul-18 A 22-Mar-18 A

DE5290

HSE LAYOUTS (JALM)

18-May-17

08-Aug-17

65

100%

0

25-May-17 A

11-Jul-18 A

DE5300

F&G AND PROCESS CAUSE & EFFECT CHARTS (JALM)

18-May-17

08-Aug-17

65

100%

0

15-May-17 A

17-Jun-18 A

DE5310

HSE DATA SHEETS (JALM)

18-May-17

15-Aug-17

71

100%

0

03-May-17 A

24-Jan-18 A

DE5320

HSE P&IDS (JALM)

18-May-17

06-Aug-17

63

100%

0

04-May-17 A

11-Jan-18 A

DE7170

DEMOLITION PROCESS CAUSE & EFFECT CHARTS (JALM)

29-May-17

14-Aug-17

62

100%

0

08-Jul-17 A

23-Aug-17 A

INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (JALM)

20-Apr-17 20-Apr-17

20-Sep-17 15-Aug-17

110 95

100%

0 0

15-Mar-17 A 22-Mar-17 A

26-Feb-18 A 25-Jan-18 A

DE5150

INPUT/OUTPUT LISTS (DEMOLITION) (JALM)

27-Apr-17

13-Jul-17

63

100%

0

15-Mar-17 A

26-Jul-17 A

DE5330

INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (JALM)

27-Apr-17

10-Aug-17

86

100%

0

18-May-17 A

10-Oct-17 A

DE5460

INSTRUMENTS DATA SHEETS (JALM)

01-May-17

08-Aug-17

81

100%

0

04-Apr-17 A

21-Dec-17 A

DE5170

INSTRUMENTS DIAGRAMS (JALM)

04-May-17

20-Sep-17

113

100%

0

25-May-17 A

26-Feb-18 A

DE5160

INSTRUMENTS INDEX (JALM)

30-May-17

14-Aug-17

62

100%

0

31-May-17 A

19-Oct-17 A

DE5470

INPUT/OUTPUT AND ALARM & TRIP LISTS (JALM)

04-Jun-17

03-Sep-17

74

100%

0

08-Jun-17 A

10-Dec-17 A

DE5180

INSTRUMENTS SCOPE OF WORK (JALM)

13-Jun-17

29-Aug-17

63

100%

0

13-Jul-17 A

19-Oct-17 A

DE5480

INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (JALM)

25-Jun-17

12-Sep-17

65

100%

0

29-Jun-17 A

19-Oct-17 A

DE5490

INSTRUMENTS MTO (JALM)

09-Aug-17

12-Sep-17

28

100%

0

28-Sep-17 A

14-Dec-17 A

01-Apr-17

27-Jul-18

507

106

03-Apr-17 A

31-Jan-19

9

01-Apr-17

27-Jul-18

507

106

03-Apr-17 A

31-Jan-19

9

01-Apr-17 13-May-17 13-May-17

27-Jul-18 27-Jul-18 19-Jul-17

507 462 56

03-Apr-17 A 28-May-17 A 28-May-17 A

27-Sep-18 A 25-Aug-18 A 10-Sep-17 A

Safety DE5280

Instrument DE7040

Procurement EQUIPMENTS

100%

0 0 0

PC1030

PREPARE VENDOR DOCUMENT REVIEW & APPROVAL

20-Jul-17

10-Sep-17

45

100%

0

12-Sep-17 A

26-Oct-17 A

PC1010

MANUFACTURING ( PROCUREMENT / MANUFAC, SHIP) - TEST SEPARATOR

11-Sep-17

27-Jul-18

320

100%

0

28-Nov-17 A

01-Aug-18 A

PC1190

DELIVERED AT AT SITE - TEST SEPARATOR - FIRST BATCH - 2 NOS

28-Jun-18

0

100%

0

23-Jul-18 A

PC1020

DELIVERED AT AT SITE - TEST SEPARATOR 2ND BATCH - 2 NOS

13-Jul-18

0

100%

0

12-Aug-18 A

PC1200

DELIVERED AT AT SITE - TEST SEPARATOR - 3RD BATCH 3NOS

Mechanical Three Phase Test Te Separator PC1000 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- TEST SEPARATOR

27-Jul-18

0

100%

0

P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL - METERING SKID

01-Jun-17 01-Jun-17

06-Apr-18 09-Aug-17

321 56

100%

0 0

12-Jul-17 A 12-Jul-17 A

27-Sep-18 A 18-Jan-18 A

PC1080

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- METERING SKID

09-Aug-17

06-Apr-18

300

100%

0

19-Jan-18 A

20-Sep-18 A

PC1090

DELIVERED AT SITE- METERING SKID

06-Apr-18

0

100%

0

01-Apr-17 01-Apr-17 01-Apr-17 01-Apr-17

30-Sep-17 30-Sep-17 30-Sep-17 13-Apr-17

186 186 186 12

BS&W Meter PC1070

100%

BID EVALUATION - TBE ISSUE TO QP

15-Apr-17

30-Apr-17

14

100%

0

21-Apr-17 A

04-May-17 A

SDPR20

TBE APPROVAL - QP

01-May-17

06-May-17

5

100%

0

05-May-17 A

09-May-17 A

SDPR30

PO ISSUE VALVES

07-May-17

08-May-17

2

100%

0

10-May-17 A

11-May-17 A

SDPR40

MANUFACURING PERIOD / SHIPMENT & PORT CLEARENACE

08-May-17

29-Sep-17

180

100%

0

14-May-17 A

31-Oct-17 A

SDPR70

DELIVERY TO SITE

30-Sep-17

0

100%

0

13-Apr-17 13-Apr-17

16-Aug-17 26-Apr-17

131 12

03-Apr-17 A 03-Apr-17 A 03-Apr-17 A 03-Apr-17 A

02-Nov-17 A 02-Nov-17 A 31-Oct-17 A 20-Apr-17 A

20-Apr-17 A 20-Apr-17 A

02-Nov-17 A 16-May-17 A

100%

SDPR010

BID EVALUATION - TBE ISSUE TO QP

27-Apr-17

17-May-17

18

100%

0

17-May-17 A

03-Jul-17 A

SDPR020

TBE APPROVAL - QP

18-May-17

23-May-17

5

100%

0

17-Jul-17 A

17-Jul-17 A

SDPR030

PO ISSUE PIPING

24-May-17

28-May-17

4

100%

0

15-Jul-17 A

17-Jul-17 A

SDPR040

MANUFACURING PERIOD & TRANSPORTATION

28-May-17

08-Aug-17

90

100%

0

18-Jul-17 A

26-Oct-17 A

SDPR050

SHIPMENT AND CLAREANCE

09-Aug-17

16-Aug-17

7

100%

0

27-Oct-17 A

02-Nov-17 A

SDPR070

DELIVERY AT SITE

16-Aug-17

0

100%

0

06-Apr-18

317

05-Jun-17

0

M 4

2017 J Jul A 5 6 7

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

31-Oct-17 A

0 0

Piping Valves

A 3

27-Sep-18 A

SDPR10

Piping and Fittings Fit / Flanges SDPR100 ENQUIRY FLOATED/ RECIEVE BIDS

M 2

17:46

25-Aug-18 A

0 0 0 0

Piping Procurment (Early (Ea Tie-in ) for all Khatiya Station BALL VALVES (1.5 inch to 10 inch) SDPR00 ENQUIRY FLOATED/ RECIEVE BIDS

F 1

29-Nov-18

02-Nov-17 A 29-Jun-17 A

13-Sep-18 A

Page 23 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule.

Page 11 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-ALL VALVES

12-Jun-17 12-Jun-17

06-Apr-18 09-Aug-17

310 48

100%

0 0

29-Jun-17 A 29-Jun-17 A

13-Sep-18 A 28-Dec-17 A

PR1000

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-ALL VALVES

09-Aug-17

06-Apr-18

300

100%

0

29-Dec-17 A

13-Sep-18 A

PR1010

DELIVERED AT SITE-ALL VALVES

06-Apr-18

0

100%

0

05-Jun-17 05-Jun-17

30-Mar-18 02-Aug-17

310 48

100%

0 0

25-Jul-17 A 25-Jul-17 A

11-Jul-18 A 21-Dec-17 A

02-Aug-17

30-Mar-18

300

100%

0

22-Dec-17 A

11-Jul-18 A

30-Mar-18

0

27-Jul-17 A 25-Dec-17 A

29-Mar-18 A 29-Mar-18 A

Ball Valves PR1020

Gate, Globe an and Check Valve PC1390 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- GGC VALVES PC1370

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- GCC VALVES

PC1380

DELIVERED AT SITE-GGC VALVES

100%

0

0 0

TF

100%

DELIVERED AT SITE-BUTTER FLY VALVES

0

100%

0

PC1600

P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- BUTTER FLY VALVES

0

100%

0

27-Jul-17 A

24-Aug-17 A

19-Jun-17 A 13-Jul-17 A 19-Jul-17 A 19-Jul-17 A

20-Dec-18 10-Dec-18 10-Dec-18 18-Jan-18 A

13 24 15

18-Jan-18 A

10-Dec-18

14

PC1560

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- ELECTRONIC INS

PC1570

DELIVERED AT SITE- ELECTRONIC INSTRUMENTS (PT/TT)

12-Jun-17 09-Aug-17 09-Aug-17 09-Aug-17

03-May-18 11-Mar-18 11-Mar-18 18-Oct-17

339 223 223 56

100%

61 50 50 0

18-Oct-17

11-Mar-18

180

95%

47

11-Mar-18

0

LEVEL GAUGES GAUGE (MAGNETIC) PC1610 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- LEVEL GAUGES (MAG

0%

0

10-Dec-18

14

0 0

24-Jul-17 A 24-Jul-17 A

10-Dec-18 12-Dec-17 A

15

100%

50 0

13-Dec-17 A

10-Dec-18

14

10-Dec-18

14

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- LEVEL GAUGES (

0

95%

47

PC1630

DELIVERED AT SITE- LEVEL GAUGES (MAGNETIC)

0

0%

0

GAUGES (PG/TG) (PG/T PC1640 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-GAUGES (PG/TG)

0 0

20-Jul-17 A 20-Jul-17 A

10-Dec-18 30-Jan-18 A

15

100%

50 0

31-Jan-18 A

10-Dec-18

14

10-Dec-18

14

PC1650

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-GAUGES (PG/TG)

0

95%

47

PC1660

DELIVERED AT SITE- GAUGES (PG/TG)

0

0%

0

0 0

24-Jul-17 A 24-Jul-17 A

10-Dec-18 15-Feb-18 A

16

100%

50 0

16-Feb-18 A

10-Dec-18

15

10-Dec-18

15

PC1680

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-LEVEL GAUGES (G

0

80%

47

PC1690

DELIVERED AT SITE- LEVEL GAUGES (GLASS TYPE)

0

0%

0

0 0

50 0

25-Jul-17 A 25-Jul-17 A

10-Dec-18 28-Dec-17 A

24

100%

29-Dec-17 A

10-Dec-18

22

10-Dec-18

22

LEVEL TRANSMITTERS TRANSM (DISPLACER) PC1700 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- LEVEL TRANSMITTERS PC1710

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-LEVEL TRANSMIT

0

80%

47

PC1720

DELIVERED AT SITE- LEVEL TRANSMITTERS (DISPLACER)

0

0%

0

LEVEL TRANSMITTERS TRANSM (RADAR) PC1730 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- LEVEL TRANSMITTER

0 0

25-Jul-17 A 25-Jul-17 A

10-Dec-18 30-Jan-18 A

13

100%

50 0 47

01-Feb-18 A

10-Dec-18

12

PC1740

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- LEVEL TRANSMIT

0

80%

PC1750

DELIVERED AT SITE- LEVEL TRANSMITTERS (RADAR)

0

FLOW TRANSMITTERS TRANSM PC1760 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- FLOW TRANSMITTERS

0%

0

10-Dec-18

12

0 0

13-Jul-17 A 13-Jul-17 A

10-Dec-18 18-Jan-18 A

10

100%

50 0

18-Jan-18 A

10-Dec-18

9

PC1770

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-FLOW TRANSMITT

0

70%

47

PC1780

DELIVERED AT SITE- FLOW TRANSMITTERS

0

0%

0

Modifcation Control Con System (Honey Well, Emerson,Yokgawa) Modifcation Control Co System (Yokgawa) PC1160 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- DCS PC1170

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DCS

PC1180

DELIVERED AT SITE- DCS (HARDWARE AND SOFTWARE)- EARLY TIE-IN WO

PC1850

DELIVERED AT SITE- DCS (HARDWARE AND SOFTWARE)-JALEHA

10-Dec-18

9

27-Jul-17 A 27-Jul-17 A 27-Jul-17 A

13-Dec-18 10-Dec-18 21-Dec-17 A

12 15

22-Dec-17 A

10-Dec-18

14

28-Jun-17 28-Jun-17 28-Jun-17

03-May-18 03-May-18 05-Sep-17

322 322 56

100%

54 50 0

05-Sep-17

03-May-18

300

65%

47

03-May-18

0

100%

0

0

0%

0

10-Dec-18

14

0 0

03-Aug-17 A 03-Aug-17 A

13-Dec-18 28-Dec-17 A

11

100%

54 0

29-Dec-17 A

13-Dec-18

11

13-Dec-18

11

Modifcation Control Co System (Honey Well) PC1790 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- DCS MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DCS

0

60%

50

PC1810

DELIVERED AT SITE- DCS (HARDWARE AND SOFTWARE)

0

0%

0

Modifcation Control Co System (Emerson) PC1820 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- DCS

0 0

10-Aug-17 A 10-Aug-17 A

27-Sep-18 A 28-Dec-17 A

29-Dec-17 A

27-Sep-18 A

100%

PC1830

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DCS

0

100%

0

PC1840

DELIVERED AT SITE- DCS (HARDWARE AND SOFTWARE)

0

100%

0

Intrumentation & Control Valves Control Valves

12-Jun-17 14-Jun-17

19-Apr-18 19-Apr-18

324 322

61 0

2017 J Jul A 5 6 7

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

20-Jan-18 A

PC1800

0 0

M 4

29-Mar-18 A

PC1620

LEVEL GAUGES GAUGE (GLASS TYPE) PC1670 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- LEVEL GAUGES (GLAS

A 3

11-Jul-18 A

PC1590

Instrumentation & Control Field Instrumentation Instrumen ELECTRONIC INSTRUMENTS I (PT/TT) PC1550 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- ELECTRONIC INSTRUM

M 2

17:46

13-Sep-18 A

0 0

Butter Fly Valves Valve - DELETED PC1580 MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- BUTTER FLY VALV

F 1

29-Nov-18

27-Sep-18 A 19-Jun-17 A 03-Aug-17 A

20-Dec-18 28-Aug-18 A

11

Page 24 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

Page 12 of32

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

PC1100

P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- CONTROL VALVES

14-Jun-17

22-Aug-17

56

100%

0

03-Aug-17 A

19-Nov-17 A

PC1110

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- CONTROL VALVE

22-Aug-17

19-Apr-18

300

100%

0

20-Nov-17 A

28-Aug-18 A

PC1120

DELIVERED AT SITE- CONTROL VALVE

19-Apr-18

0

100%

0

12-Jun-17 12-Jun-17

17-Apr-18 20-Aug-17

322 56

19-Jun-17 A 19-Jun-17 A

20-Dec-18 05-Apr-18 A

11

100%

61 0

20-Aug-17

17-Apr-18

300

80%

57

06-Apr-18 A

20-Dec-18

11

17-Apr-18

0

20-Dec-18

11

SDV / BDV Valve Valv PC1460 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- SD / BD VALVE PC1470

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- SD/ BD VALVE

PC1480

DELIVERED AT SITE- SD/ BD VALVE

0%

0

0 0

02-Aug-17 A 02-Aug-17 A

02-Aug-18 A 15-Feb-18 A

16-Feb-18 A

02-Aug-18 A

100%

PC1870

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- RESTRICTION OR

0

100%

0

PC1880

DELIVERED AT SITE- RESTRICTION ORIFICE

0

100%

0

0 0

50 0

19-Jun-17 A 19-Jun-17 A

10-Dec-18 04-Jan-18 A

10

100%

05-Jan-18 A

10-Dec-18

9

10-Dec-18

9

Pressure Relief Relie Valve PC1890 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- PRESSURE RELIEF VA MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- PRESSURE REL

0

90%

47

PC1910

DELIVERED AT SITE- PRESSURE RELIEF VALVES

0

0%

0 23-Jul-17 A 23-Jul-17 A 23-Jul-17 A

31-Jan-19 10-Dec-18 25-Jan-18 A

9 23

26-Jan-18 A

10-Dec-18

21

10-Dec-18

21

10-Jul-17 10-Jul-17 10-Jul-17

09-May-18 01-Apr-18 21-Sep-17

319 279 60

100%

106 50 0

21-Sep-17

01-Apr-18

240

50%

47

01-Apr-18

0

0%

0

19-Jul-17 19-Jul-17

22-Mar-18 27-Sep-17

258 56

69 0

25-Jul-17 A 25-Jul-17 A

27-Dec-18 29-Mar-18 A

4

100%

27-Sep-17

22-Mar-18

220

90%

64

01-Apr-18 A

27-Dec-18

4

22-Mar-18

0

0%

0

27-Dec-18

4

09-May-18 27-Sep-17

309 56

100%

106 0

25-Jul-17 A 25-Jul-17 A

31-Jan-19 22-Feb-18 A

9

P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- DELUDGE SKID

19-Jul-17 19-Jul-17

PC1050

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DELUDGE SKID

27-Sep-17

09-May-18

280

55%

99

23-Feb-18 A

31-Jan-19

0

PC1060

DELIVERED AT SITE-DELUDGE SKID -1st LOT (Khatiya Stations)

09-May-18

0

0%

0

31-Dec-18

0

PC1950

DELIVERED AT SITE-DELUDGE SKID - 2nd LOT Remaining Stations

0

0%

0

31-Jan-19

9

PC1140

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-FIRE & GAS DEV

PC1150

DELIVERED AT SITE-FIRE & GAS DEVICES

Fire Fighting Equipments Eq PC1490 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- FIRE FIGHTING EQUIP PC1500

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-FIRE FIGHTING EQ

PC1510

DELIVERED AT SITE- FIRE FIGHTING EQUIPMENTS

Deludge Skid PC1040

Bulk Material Electrical Bulks Power & Control Contro Cables PC1250 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-POWER & CONT CABLE PC1260

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-POWER & CONT C

PC1270

DELIVERED AT SITE-POWER & CONT CABLES

Electrical Bulk Material M PC1220 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-ELECTRIC BULK PC1230

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-ELECTRIC BULK

PC1240

DELIVERED AT SITE-ELECTRIC BULK

Instrumentation Instrumentation Bulk Material PC1400 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-INSTRUMENTATION BU PC1410

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-INSTRUMENTATIO

PC1420

DELIVERED AT SITE-INSTRUMENTATION BULK

Instrument Cables Cabl PC1430 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-INSTRUMENT CABLES PC1440

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-INSTRUMENT CAB

PC1450

DELIVERED AT SITE-INSTRUMENT CABLES

Piping Bulk Pipes / Fittings & Flanges PC1310 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-PIPES

A 3

M 4

2017 J Jul A 5 6 7

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

02-Aug-18 A

PC1900

Safety Fire and Gas Detectors De PC1130 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-FIRE & GAS DEVICES

M 2

17:46

28-Aug-18 A

0 0

RESTRICTION ORIFICE PC1860 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- RESTRICTION ORIFICE

F 1

29-Nov-18

29-Jun-17

27-Jan-18

217

31

30-Jul-17 A

22-Nov-18

17

09-Jul-17 09-Jul-17 09-Jul-17

15-Jan-18 15-Jan-18 17-Sep-17

198 198 56

30-Jul-17 A 30-Jul-17 A 30-Jul-17 A

22-Nov-18 22-Nov-18 06-Mar-18 A

8 8

100%

31 31 0

17-Sep-17

15-Jan-18

150

65%

29

07-Mar-18 A

22-Nov-18

8

15-Jan-18

0

0%

0

22-Nov-18

8

09-Jul-17 09-Jul-17

22-Dec-17 17-Sep-17

172 56

100%

0 0

30-Jul-17 A 30-Jul-17 A

15-Aug-18 A 06-Mar-18 A

17-Sep-17

22-Dec-17

120

100%

0

07-Mar-18 A

15-Aug-18 A

22-Dec-17

0

100%

0

24-Aug-17 24-Aug-17 24-Aug-17

27-Jan-18 17-Jan-18 06-Nov-17

161 151 60

100%

31 0 0

10-Aug-17 A 10-Aug-17 A 10-Aug-17 A

22-Nov-18 18-Aug-18 A 06-Mar-18 A

06-Nov-17

17-Jan-18

90

100%

0

06-Mar-18 A

18-Aug-18 A

15-Aug-18 A 1

17-Jan-18

0

100%

0

24-Aug-17 24-Aug-17

27-Jan-18 23-Oct-17

161 48

10-Aug-17 A 10-Aug-17 A

22-Nov-18 06-Mar-18 A

1

100%

31 0

18-Aug-18 A

23-Oct-17

27-Jan-18

120

95%

29

06-Mar-18 A

22-Nov-18

2

27-Jan-18

0

0%

0

22-Nov-18

2

29-Jun-17 29-Jun-17 29-Jun-17

25-Dec-17 25-Dec-17 27-Aug-17

182 182 48

03-Aug-17 A 13-Aug-17 A 13-Aug-17 A

20-Nov-18 27-Sep-18 A 18-Jan-18 A

19

100%

29 0 0

27-Aug-17

25-Dec-17

19-Jan-18 A

05-Jul-18 A

PC1320

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-PIPES / FITTINGS

150

100%

0

PC1990

DELIVERED AT FABRICATION FACILITY / SITE -PIPES / FITTINGS & FLANGE

0

100%

0

PC2000

DELIVERED AT FABRICATION FACILITY / SITE -PIPES / FITTINGS & FLANGE

0

100%

0

30-Jul-18 A

PC2010

DELIVERED AT FABRICATION FACILITY / SITE -PIPES / FITTINGS & FLANGE

0

100%

0

20-Sep-18 A

PC2020

DELIVERED AT FABRICATION FACILITY / SITE -PIPES / FITTINGS & FLANGE

0

100%

0

PROJECT FITTINGS FITTIN PC1920 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-PROJECT FITTINGS (Y-T

0 0

100%

0 0

30-Jul-18 A

27-Sep-18 A 03-Aug-17 A 03-Aug-17 A

27-Sep-18 A 18-Jan-18 A

Page 25 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

Page 13 of32

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

19-Jan-18 A

27-Sep-18 A

TF

PC1930

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- (Y-TYPE STRAINE

0

100%

0

PC1940

DELIVERED AT SITE- (Y-TYPE STRAINER/CC PROBES)

0

100%

0 10-Aug-17 A 10-Aug-17 A

20-Nov-18 18-Jan-18 A

19

19-Jan-18 A

20-Nov-18

18

20-Nov-18

18

25-Dec-17 27-Aug-17

182 48

100%

29 0

27-Aug-17

25-Dec-17

150

90%

27

25-Dec-17

0

0%

0

P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- STEEL STRUCTURE

05-Aug-17 05-Aug-17 05-Aug-17

14-Dec-17 14-Dec-17 03-Oct-17

137 137 48

100%

0 0 0

07-Aug-17 A 07-Aug-17 A 07-Aug-17 A

25-Jan-18 A 25-Jan-18 A 19-Dec-17 A

PR1040

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-STEEL STRUCTUR

03-Oct-17

14-Dec-17

90

100%

0

20-Dec-17 A

25-Jan-18 A

PR1050

DELIVERED AT SITE-STEEL STRUCURE

14-Dec-17

0

100%

0

04-May-17

21-Aug-17

91

0

04-Jun-17 A

14-Nov-17 A

PACKAGE ENQUIRY FLOATED FOR HSE WORKS

04-May-17 04-May-17

20-Jun-17 10-May-17

40 5

100%

0 0

04-Jun-17 A 04-Jun-17 A

08-Oct-17 A 10-Jun-17 A

PC1530

RECEIVE BIDS, EVALUATION, COMPANY APPROVAL

10-May-17

14-Jun-17

30

100%

0

10-Jun-17 A

03-Oct-17 A

PC1540

ISSUE PO

14-Jun-17

20-Jun-17

5

100%

0

04-Oct-17 A

08-Oct-17 A

21-Aug-17 20-Jun-17

55 5

01-Jul-17 A 01-Jul-17 A

14-Nov-17 A 05-Jul-17 A

PC1350

MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-GASKETS AND BO

PC1360

DELIVERED AT SITE-GASKETS AND BOLTS

Civil Steel Structure PR1030

Sub-Contract Packages Pac HSE Studies PC1520

PACKAGE ENQUIRY FLOATED FOR NDT WORKS

100%

0 0

PS1010

RECEIVE BIDS, EVALUATION, COMPANY APPROVAL

21-Jun-17

15-Aug-17

45

100%

0

06-Jul-17 A

12-Nov-17 A

PS1020

ISSUE PO NDT

16-Aug-17

21-Aug-17

5

100%

0

13-Nov-17 A

14-Nov-17 A

Pre-construction Prepartation P Mobilization Plan

19-Feb-17

02-Oct-17

187

0

16-Mar-17 A

21-Jan-18 A

23-May-17

02-Oct-17

107

0

10-Aug-17 A

21-Jan-18 A

A1390

MANPOWER MOBILIZATION FOR TCF SET-UP

23-May-17

24-Aug-17

78

100%

0

10-Aug-17 A

09-Jan-18 A

A1400

EQUIPMENT MOBILIZATION FOR TCF SET-UP

23-May-17

24-Aug-17

78

100%

0

10-Sep-17 A

09-Jan-18 A

A1410

MANPOWER MOBILIZATION FOR PLANT CONSTRUCTION

24-Jul-17

02-Oct-17

57

100%

0

15-Oct-17 A

21-Jan-18 A

A1420

EQUIPMENT MOBILIZATION FOR PLANT CONSTRUCTION

24-Jul-17

02-Oct-17

57

100%

0

05-Oct-17 A

21-Jan-18 A

19-Feb-17

03-Aug-17

140

0

16-Mar-17 A

27-Sep-17 A

Documents Prepatation Prep A1350

PLANNING PACKAGE APPROVED BY QP

19-Feb-17

22-May-17

80

100%

0

16-Mar-17 A

27-Sep-17 A

A1360

H&S PLAN APPROVED BY QP

23-May-17

03-Aug-17

60

100%

0

27-Mar-17 A

10-Aug-17 A

A1370

QA/QC PLAN APPROVED BY QP

23-May-17

03-Aug-17

60

100%

0

25-Mar-17 A

04-Jul-17 A

A1380

CEMP APPROVED BY QP

23-May-17

03-Aug-17

60

100%

0

16-Apr-17 A

27-Aug-17 A

23-May-17

24-Aug-17

78

0

02-Sep-17 A

11-Jan-18 A

23-May-17

24-Aug-17

78

0

02-Sep-17 A

11-Jan-18 A

03-Jun-17

24-Dec-18

601

267

09-Jun-17 A

01-Jul-19

03-Jun-17

23-Oct-17

116

0

09-Jun-17 A

18-Jan-18 A

03-Jun-17 03-Jun-17

23-Oct-17 27-Jul-17

116 45

100%

0 0

09-Jun-17 A 09-Jun-17 A

18-Jan-18 A 11-Jan-18 A 30-Dec-17 A

TCF Set-up A1430

TCF SET-UP

CONSTRUCTION WORKS Early Tie-in (3 Degassing De Station) Welder Qualification Qualifica (Shutdown Tie-in ) for KM /KN/KS SDCN110 METHOD STATEMENTS / WPS / PQR

100%

SDCN90

WELDER QUALIFICATION

17-Aug-17

25-Sep-17

30

100%

0

28-Oct-17 A

SDCN100

SPOOL FABRICATION

02-Sep-17

16-Oct-17

35

100%

0

19-Dec-17 A

SDCN120

READY FOR SHUTDOWN

23-Oct-17

0

100%

0

21-Nov-18

325

117

25-Dec-17 A

10-Mar-19

62

29-Mar-18 22-Mar-18 11-Mar-18 11-Mar-18

29 22 12 12

95%

43 14 10 10

06-Feb-18 A 06-Feb-18 A 16-Aug-18 A 16-Aug-18 A

13-Dec-18 10-Nov-18 05-Nov-18 05-Nov-18

9 33 0 0

METERING SKID SK F250 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFE

19-Mar-18 19-Mar-18

22-Mar-18 22-Mar-18

4 4

100%

0 0

19-Jun-18 A 19-Jun-18 A

26-Aug-18 A 26-Aug-18 A

PSV F240

FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSF

15-Mar-18 15-Mar-18

18-Mar-18 18-Mar-18

3 3

95%

10 10

06-Feb-18 A 06-Feb-18 A

05-Nov-18 05-Nov-18

21 21

PIPE SUPPORT F230 FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATI

12-Mar-18 12-Mar-18

14-Mar-18 14-Mar-18

3 3

98%

14 14

06-Feb-18 A 06-Feb-18 A

10-Nov-18 10-Nov-18

33 3

0

100%

0

02-Sep-18 A

16-Sep-18 A

25-Feb-18 25-Feb-18 25-Feb-18

29-Mar-18 29-Mar-18 29-Mar-18

29 29 29

27-Sep-18 A 27-Sep-18 A 08-Oct-18 A

13-Dec-18 13-Dec-18 03-Dec-18

9 0 0

04-Dec-18

13-Dec-18

0

FABRICATION OF INSTRUMENT STANCHION SUPPORTS

0%

43 43 34

F320-2

FBE PIPING BULK DELIVER AT SITE

0

0%

9

F290-00

PIPE DELIVER AT KUWAIT

0

100%

0

REMAINING PIPING PI (NON - FBE)

0

33

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

18-Jan-18 A

25-Feb-18 26-Feb-18 26-Feb-18 26-Feb-18

F260-1

2017 J Jul A 5 6 7

30-Dec-17 A

07-Nov-17

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F290 PIPING FABRICATION & FBE COATING AT KUWAIT

M 4

23

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F220 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR

KAHS

A 3

25-Jan-18 A

15-Jun-17 15-Jun-17

NDT PS1000

M 2

17:46

27-Sep-18 A

29-Jun-17 29-Jun-17

Gaskets and Bolts Bo PC1340 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-GASKETS AND BOLTS

F 1

29-Nov-18

27-Sep-18 A 27-Sep-18 A

02-Dec-18

19

Page 26 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

Page 14 of32

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

F290-1

COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATING

0

0%

26

21-Oct-18 A

24-Nov-18

3

F320-1

FABRICATION SPOOLS DELIVER TO SITE

0

0%

13

18-Nov-18

02-Dec-18

19

F290-4

PIPE DELIVER AT FAB FACILITY

0

100%

0

19-Nov-18 19-Nov-18 19-Nov-18 15-Jan-18

323 269 269 5

25-Dec-17 A 25-Dec-17 A 10-Feb-18 A 10-Feb-18 A

14-Jan-19 14-Jan-19 14-Jan-19 31-May-18 A

10 6 6

GRADING

100%

70 70 70 0

A1770

ROADSND PAVING(INCLUDING MODIFICATIONS)

10-Oct-18

25-Oct-18

14

0%

13

31-Dec-18

14-Jan-19

6

A1790

DRAINAGE PIPE CULVERTS

27-Oct-18

11-Nov-18

14

0%

20

08-Dec-18

30-Dec-18

5

A1800

ROAD SAFETY CRASH BARRIERS AND BOLLARD

27-Oct-18

29-Oct-18

3

0%

13

31-Dec-18

14-Jan-19

6

A1780

UTILITY ROAD CROSSINGS

27-Oct-18

19-Nov-18

21

0%

26

11-Dec-18

09-Jan-19

5

A1780-2

CABLE TRENCHES

0

35%

25

24-Sep-18 A

22-Nov-18

2

A1710-1

PROTECTION OF UNDERGROUND CABLES

0

90%

25

14-Sep-18 A

22-Nov-18

5

A1715-6

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL

0

98%

8

06-Aug-18 A

03-Nov-18

2

A1800-1

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

0

0%

13

30-Dec-18

13-Jan-19

7

10-Feb-18 A 10-Feb-18 A

08-Aug-18 A 01-Mar-18 A

07-Apr-18 A

12-Apr-18 A

TEST SEPERATOR SEPERAT A1715 EXCAVATION FOR THE MAIN FOUNDATIONS

10-Jan-18 10-Jan-18

19-Feb-18 17-Jan-18

35 7

100%

0 0

18-Jan-18

19-Feb-18

28

100%

0

A1720

FOUNDATION WORK (STEEL FIXING)

A1720-1

FOUNDATION WORK (CONCRETE)

0

100%

0

07-Apr-18 A

26-Apr-18 A

A1720-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

17-May-18 A

08-Aug-18 A

TEST SEPERAT SEPERATOR PLATFORM A1715-1 EXCAVATION FOR THE MAIN FOUNDATIONS

0 0

100%

0 0

10-Feb-18 A 10-Feb-18 A

08-Aug-18 A 01-Mar-18 A

A1720-3

FOUNDATION WORK (STEEL FIXING)

0

100%

0

07-Apr-18 A

12-Apr-18 A

A1720-4

FOUNDATION WORK (CONCRETE)

0

100%

0

07-Apr-18 A

26-Apr-18 A

A1720-5

CURING / WATERPROOFING / BACK FILLING

0

METERING SKID SK A1760 FOUNDATION WORK (CONCRETE)

17-Mar-18 17-Mar-18

24-Mar-18 24-Mar-18

100%

0

17-May-18 A

08-Aug-18 A

7 7

100%

0 0

10-Feb-18 A 18-Mar-18 A

08-Aug-18 A 24-May-18 A 24-Mar-18 A

A1715-2

EXCAVATION

0

100%

0

10-Feb-18 A

A1760-1

FOUNDATION WORK (STEEL FIXING)

0

100%

0

22-Mar-18 A

12-Apr-18 A

A1760-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

15-May-18 A

08-Aug-18 A

21 21

100%

0 0

25-Dec-17 A 25-Dec-17 A

25-Oct-18 A 08-Aug-18 A

PIPE SUPPORT A1740 FOUNDATION WORK (STEEL FIXING)

20-Feb-18 20-Feb-18

15-Mar-18 15-Mar-18

A1715-3

EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS

0

100%

0

25-Dec-17 A

19-Jul-18 A

A1740-1

FOUNDATION WORK (CONCRETE)

0

100%

0

25-Dec-17 A

14-Aug-18 A

A1740-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

25-Dec-17 A

25-Oct-18 A

EXCAVATION (INCLUDING AREA LIGHTING POLES)

0 0

100%

0 0

05-Mar-18 A 05-Mar-18 A

06-Aug-18 A 31-May-18 A

A1760-5

FOUNDATION WORK (STEEL FIXING)

0

100%

0

25-Mar-18 A

17-May-18 A

A1760-3

FOUNDATION WORK (CONCRETE)

0

100%

0

18-Mar-18 A

21-Jun-18 A

A1760-4

CURING / WATERPROOFING / BACK FILLING

0

100%

0

18-Mar-18 A

06-Aug-18 A

27-Sep-18 A 27-Sep-18 A 27-Sep-18 A

29-Nov-18 21-Nov-18 21-Nov-18

21 10 0 10

PSV A1715-4

20-Aug-18 20-Aug-18 20-Aug-18

08-Sep-18 04-Sep-18 27-Aug-18

17 14 7

10%

31 24 24

02-Sep-18

04-Sep-18

3

0%

9

12-Nov-18

21-Nov-18

METERING SKID SK A2490 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W

23-Aug-18 23-Aug-18

28-Aug-18 28-Aug-18

5 5

100%

0 0

13-Oct-18 A 13-Oct-18 A

23-Oct-18 A 23-Oct-18 A

PSV A2500

27-Aug-18 27-Aug-18

01-Sep-18 01-Sep-18

5 5

0%

19 19

17-Oct-18 A 17-Oct-18 A

15-Nov-18 15-Nov-18

21 21

05-Sep-18 05-Sep-18

08-Sep-18 08-Sep-18

3 3

0%

29 29

10-Oct-18 A 10-Oct-18 A

27-Nov-18 27-Nov-18

21 21

0 0

0%

5 5

25-Nov-18 25-Nov-18

29-Nov-18 29-Nov-18

21 21

100%

0 0

09-Aug-18 A 09-Aug-18 A

09-Aug-18 A 09-Aug-18 A

31-Dec-17 A 31-Dec-17 A 31-Dec-17 A

09-Jan-19 17-Feb-18 A 31-Dec-17 A

31-Dec-17 A

05-Jan-18 A

Structural Steel TEST SEPERATOR SEPERAT A2480 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2510

INSTALLATION OF LADDERS, STAIRS, HANDRAILS

INSTALLATION OF PSV VALVES ACCESS PLATFORMS

PIPE SUPPORT A2520 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS FIELD INSTRUMENT INSTRUM A2520-1 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2815

INSTALLATION OF NEW TEST SEPARATOR

Piping EARLY SHUTDOWN SHUTDO WORKS - Pre Shutdown and Plant Shutdown Tie-in A3061 MOBILIZATION OF OF TEAM APPLY PTW A3071

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

02-Aug-18 02-Aug-18

19-Aug-18 19-Aug-18

15 15

07-Nov-17 07-Nov-17 07-Nov-17

17-Sep-18 22-Dec-17 07-Nov-17

269 38 1

100%

22 0 0

08-Nov-17

30-Nov-17

20

100%

0

M 2

A 3

M 4

2017 J Jul A 5 6 7

S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

27-Sep-18 A

07-Nov-17 10-Jan-18 10-Jan-18 10-Jan-18

INSTALLATION Civil Works COMMON A1710

F 1

29-Nov-18

14

Page 27 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule.

Page 15 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

A3081

PIPING TIE-IN / NDT

06-Dec-17

20-Dec-17

12

100%

0

09-Feb-18 A

14-Feb-18 A

A3091

TIE-IN COMPLETE / REMOVE SCAFFOLD

21-Dec-17

22-Dec-17

2

100%

0

06-Feb-18 A

17-Feb-18 A

09-Aug-18 09-Aug-18

17-Sep-18 01-Sep-18

34 20

0%

22 18

16-Dec-18 16-Dec-18

09-Jan-19 05-Jan-19

4 0

STATION PIPING PIPIN A3020 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT A3030

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

20-Aug-18

26-Aug-18

6

0%

4

06-Jan-19

09-Jan-19

4

A3040

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

02-Sep-18

05-Sep-18

4

0%

12

24-Dec-18

06-Jan-19

3

A3050

TIE-IN

06-Sep-18

17-Sep-18

10

0%

4

06-Jan-19

09-Jan-19

0

A3020-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

9

24-Dec-18

02-Jan-19

0

A3051-1

REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV

0

0%

3

07-Jan-19

09-Jan-19

3

232 14

0%

52 7

08-Nov-18 22-Dec-18

07-Jan-19 29-Dec-18

5 9

CABLE GLANDING AND TERMINATION

16-Jan-18 16-Jan-18

13-Oct-18 31-Jan-18

A3460

U/G CABLE LAYING

01-Feb-18

08-Feb-18

7

0%

5

29-Nov-18

04-Dec-18

5

A3470

CABLE TRAY INSTALLATION

28-Aug-18

12-Sep-18

14

0%

8

22-Nov-18

01-Dec-18

0

A3480

ELECTRICAL EQUIPMENTS INSTALLATION

13-Sep-18

20-Sep-18

7

0%

10

09-Dec-18

19-Dec-18

5

A3490

CABLE LAYING

22-Sep-18

29-Sep-18

7

0%

8

02-Dec-18

10-Dec-18

5

A3500

LIGHTING FIXTURE AND DB INSTALLATION

22-Sep-18

29-Sep-18

7

0%

8

16-Dec-18

24-Dec-18

5

A3510

ELECTRICAL TIE-INS

30-Sep-18

07-Oct-18

7

0%

2

03-Jan-19

05-Jan-19

5

A3520

ENERGIZATION

08-Oct-18

13-Oct-18

5

0%

3

05-Jan-19

07-Jan-19

5

A3460-1

BACK FILLING OF CABLE TRENCH

0

0%

9

02-Dec-18

11-Dec-18

5

A3510-1

HOOK UP

0

0%

4

25-Dec-18

29-Dec-18

5

A3530

EARTH PIT DRILLING

0

Electrical A3450

Instrument & Control Co A4090 DCS MODIFICATION IN CONTROL ROOM BY VENDOR

0%

4

08-Nov-18

12-Nov-18

0

20-Aug-18 20-Aug-18

17-Nov-18 02-Sep-18

77 12

0%

49 10

13-Nov-18 25-Dec-18

08-Jan-19 05-Jan-19

0 0

A4050

CABLE TRAY AND SUPPORTS INSTALLATION

01-Sep-18

16-Sep-18

14

0%

17

13-Nov-18

02-Dec-18

0

A4060

INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING

17-Sep-18

24-Sep-18

7

0%

4

05-Jan-19

08-Jan-19

0

A4070

INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, RELIEF VALVE & CONT

25-Sep-18

02-Oct-18

7

0%

6

20-Dec-18

26-Dec-18

0

A4080

SS TUBING AND LEAK TEST

03-Oct-18

08-Oct-18

5

0%

4

01-Jan-19

05-Jan-19

0

A5300

INSTALLATION OF DELUGE

09-Oct-18

16-Oct-18

7

0%

7

01-Jan-19

08-Jan-19

0

A4640

JB SUPPORT INSTALLATION

21-Oct-18

23-Oct-18

3

0%

4

02-Dec-18

05-Dec-18

0

A4740

JB INSTALLATION

14-Nov-18

17-Nov-18

3

0%

3

04-Dec-18

06-Dec-18

0

A4090-2

INSTALLATION OF INSTRUMENT VALVE

0

0%

3

23-Dec-18

25-Dec-18

8

A4080-2

FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)

0

0%

7

16-Dec-18

23-Dec-18

9

A4090-1

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

2

25-Dec-18

26-Dec-18

7

A4080-1

INSTRUMENT CABLE LAYING

0

0%

17

05-Dec-18

24-Dec-18

0

A4080-11

CABLE GLANDS AND TERMINATION (ALONG JBs)

0

0%

10

24-Dec-18

03-Jan-19

0

A4080-21

CABLE GLANDS AND TERMINATION (ALONG INSTRUMENTS)

0

0%

5

20-Dec-18

25-Dec-18

9

F&G CABLE INSTALLATION

0 0

0%

33 9

28-Nov-18 05-Dec-18

05-Jan-19 15-Dec-18

7 25

A5920

F&G SUPPORTS INSTALLATION

0

0%

4

28-Nov-18

02-Dec-18

30

A5930

F&G DEVICES INSTALLATION

0

0%

5

11-Dec-18

16-Dec-18

24

A5940

F&G JB SUPPORT INSTALLATION

0

0%

2

05-Dec-18

06-Dec-18

32

A5950

F&G JB INSTALLATION

0

0%

3

06-Dec-18

09-Dec-18

30

A5960

F&G CABLE GLANDING AND TERMINATION

0

0%

5

20-Dec-18

25-Dec-18

9

A5970

F&G LOOP PREPARATION

0

0%

3

25-Dec-18

27-Dec-18

9

A5980

F&G LOOP TESTING

0

0%

5

31-Dec-18

05-Jan-19

7

15-Dec-18 15-Dec-18

06-Jan-19 27-Dec-18

4 4

F&G System A5910

Painting & Fireproofing Firep A4360 STRUCTURAL STEEL PAINTING AND TOUCH-UP

28-Aug-18 28-Aug-18

13-Sep-18 04-Sep-18

15 7

0%

20 12

A4380

FIREPROOFING FOR STRUCTURAL STEEL

05-Sep-18

12-Sep-18

7

0%

16

19-Dec-18

06-Jan-19

4

A4370

PIPING PAINTING AND TOUCH-UP

06-Sep-18

13-Sep-18

7

0%

4

24-Dec-18

27-Dec-18

4

06-Sep-18 06-Sep-18

25-Oct-18 09-Sep-18

43 3

0%

73 3

09-Sep-18 A 06-Jan-19

17-Jan-19 08-Jan-19

1 0

Pre-commisionin Pre-commisioning A3051 INST LOOP AND FUNCTIONAL TEST A4610

PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING

02-Oct-18

09-Oct-18

7

17%

58

09-Sep-18 A

31-Dec-18

10

A4650

DELUGE SKID FUNCTIONAL TESTING

02-Oct-18

25-Oct-18

21

0%

5

09-Jan-19

14-Jan-19

4

A4620

ELECTRICAL LIGHITING TEST

06-Oct-18

08-Oct-18

3

0%

5

08-Jan-19

13-Jan-19

0

A4630

PUNCHLIST

17-Oct-18

20-Oct-18

3

0%

4

14-Jan-19

17-Jan-19

0

A4620-1

LEAK TEST FOR PIPING AND SEPARATOR

0

0%

5

08-Jan-19

13-Jan-19

0

8

17-Jan-19

26-Jan-19

0

Commissioning

01-Nov-18

09-Nov-18

7

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 28 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Page 16 of32 Act. Fin / F-C Fin

TF

A5010

START OF PRODUCTION

01-Nov-18

3

0%

0

17-Jan-19

A5020

COMMISSIONING AND STARTUP

01-Nov-18

04-Nov-18

3

0%

4

17-Jan-19

21-Jan-19

A5030

PERFORMANCE TESTS

04-Nov-18

09-Nov-18

7

0%

4

22-Jan-19

26-Jan-19

0

03-Nov-18 03-Nov-18

21-Nov-18 06-Nov-18

16 3

17-Jan-19 17-Jan-19

10-Mar-19 20-Jan-19

62 67

0%

DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)

06-Nov-18

08-Nov-18

2

0%

2

27-Jan-19

28-Jan-19

62

DM1100

APPLY ANTI RUST TO FOUNDATION BOTLS

08-Nov-18

10-Nov-18

1

0%

3

28-Jan-19

30-Jan-19

80

DM1090

COLD CUTTING INLET AND OUTLET PIPING REMOVAL

10-Nov-18

13-Nov-18

3

0%

21

28-Jan-19

20-Feb-19

62

DM1110

UNBOLD & REMOVE EXISTING SEPARATOR

13-Nov-18

15-Nov-18

2

0%

4

20-Feb-19

24-Feb-19

62

DM1120

REMOVE CONCRETE FOUNDATION / GRADE THE AREA

15-Nov-18

21-Nov-18

5

0%

13

24-Feb-19

10-Mar-19

62

DM1130

DEMOLITION WORKS COMPLETE

0%

21-Nov-18

0

10-Mar-19

62

03-Oct-17

18-Dec-18

378

120

10-Dec-17 A

13-Mar-19

59

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F110 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR

24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18

11-Mar-18 25-Feb-18 10-Feb-18 10-Feb-18

40 28 15 15

90%

44 17 17 17

09-May-18 A 09-May-18 A 19-Sep-18 A 19-Sep-18 A

15-Dec-18 13-Nov-18 13-Nov-18 13-Nov-18

33 29 3 3

METERING SKID SK F140 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFE

20-Feb-18 20-Feb-18

25-Feb-18 25-Feb-18

5 5

100%

0 0

28-May-18 A 28-May-18 A

16-Aug-18 A 16-Aug-18 A

PSV F130

15-Feb-18 15-Feb-18

19-Feb-18 19-Feb-18

4 4

100%

0 0

17-May-18 A 17-May-18 A

21-Aug-18 A 21-Aug-18 A

11-Feb-18 11-Feb-18

14-Feb-18 14-Feb-18

4 4

99%

17 17

09-May-18 A 09-May-18 A

13-Nov-18 13-Nov-18

0

100%

0

15-Aug-18 A

16-Sep-18 A

0%

44 44 34

27-Sep-18 A 27-Sep-18 A 08-Oct-18 A

15-Dec-18 15-Dec-18 03-Dec-18

33 33 43

01-Dec-18

15-Dec-18

12

FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TO SITE

PIPE SUPPORT F120 COMPLETE FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR F120-1

FABRICATION OF INSTRUMENT STANCHION SUPPORTS

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F180 PIPING FABRICATION & FBE COATING AT KUWAIT F210

FBE PIPING BULK DELIVER AT SITE

F180-2

PIPE DELIVER AT KUWAIT

FABRICATION SPOOLS DELIVER TO SITE

F180-3

PIPE DELIVER AT FAB FACILITY

INSTALLATION Civil Works COMMOMN A1440

11-Mar-18 11-Mar-18 24-Feb-18

39 39 26

22-Feb-18

11-Mar-18

15

0%

13

0

100%

0

0 0

0%

37 33

27-Sep-18 A 27-Oct-18

08-Dec-18 03-Dec-18

3 3

0

0%

13

24-Nov-18

08-Dec-18

3

0

100%

0

100%

72 72 72 0

10-Dec-17 A 10-Dec-17 A 10-Feb-18 A 10-Feb-18 A

GRADING

03-Oct-17 03-Oct-17 03-Oct-17 03-Oct-17

18-Dec-18 06-Oct-18 06-Oct-18 26-Oct-17

378 315 315 21

16-Jan-19 16-Jan-19 16-Jan-19 31-May-18 A

11 6 6 9

CABLE TRENCHES AND UTILITY ROAD CROSSINGS

28-Oct-17

20-Nov-17

21

35%

24

25-Aug-18 A

21-Nov-18

DRAINAGE PIPE CULVERTS

12-Sep-18

27-Sep-18

14

100%

0

30-Sep-18 A

16-Oct-18 A

A1530

ROAD SAFETY CRASH BARRIERS AND BOLLARD

12-Sep-18

06-Oct-18

21

0%

13

02-Jan-19

16-Jan-19

6

A1500

ROADS AND PAVING(INCLUDING MODIFICATIONS)

12-Sep-18

27-Sep-18

14

0%

13

02-Jan-19

16-Jan-19

6

A1440-1

PROTECTION OF UNDERGROUND CABLES

0

90%

24

05-Sep-18 A

21-Nov-18

13

A1445-6

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL

0

90%

20

14-Aug-18 A

17-Nov-18

13

A1530-1

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

0

0%

13

02-Jan-19

16-Jan-19

6

09-Feb-18 A 09-Feb-18 A

11-Aug-18 A 29-Mar-18 A

01-Apr-18 A

12-Apr-18 A

28-Nov-17 26-Oct-17

38 10

100%

0 0

28-Oct-17

28-Nov-17

28

100%

0

A1450

FOUNDATION WORK (STEEL FIXING)

A1450-1

FOUNDATION WORK (CONCRETE)

0

100%

0

01-Apr-18 A

26-Apr-18 A

A1450-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

24-May-18 A

11-Aug-18 A

TEST SEPERAT SEPERATOR PLATFORM A1445-1 EXCAVATION FOR THE MAIN FOUNDATIONS

0 0

100%

0 0

09-Feb-18 A 09-Feb-18 A

11-Aug-18 A 29-Mar-18 A

01-Apr-18 A

16-Jul-18 A

A1450-3

FOUNDATION WORK (STEEL FIXING)

0

100%

0

A1450-4

FOUNDATION WORK (CONCRETE)

0

100%

0

01-Apr-18 A

26-Jul-18 A

A1450-5

CURING / WATERPROOFING / BACK FILLING

0

100%

0

27-May-18 A

11-Aug-18 A

7 7

100%

0 0

06-Mar-18 A 01-Apr-18 A

11-Aug-18 A 12-Apr-18 A

METERING SKID SK A1490 FOUNDATION WORK (STEEL FIXING)

25-Dec-17 25-Dec-17

01-Jan-18 01-Jan-18

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

27-Sep-18 A

A1520

16-Oct-17 16-Oct-17

2017 J Jul A 5 6 7

27-Sep-18 A

A1510

TEST SEPERATOR SEPERAT A1445 EXCAVATION FOR THE MAIN FOUNDATIONS

M 4

29 0

25-Jan-18 25-Jan-18 25-Jan-18

REMAINING PIPING PI ( NON FBE) F180-1 COMPLETE PIPING FABRICATION . HYDROTEST/ PAINTING & COATING F210-1

0

A 3

0

DM1080

KAHN

M 2

17:46

0

45 3

Demolition Works Work DM1070 WORK PERMIT APPROVED FOR DEMOLITION

F 1

29-Nov-18

A1445-2

EXCAVATION

0

100%

0

06-Mar-18 A

29-Mar-18 A

A1490-1

FOUNDATION WORK (CONCRETE)

0

100%

0

01-Apr-18 A

26-Apr-18 A

A1490-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

28-May-18 A

11-Aug-18 A

Page 29 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

PIPE SUPPORT A1470 FOUNDATION WORK (STEEL FIXING)

U3963- Updated Revised Baseline Schedule.

Page 17 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

29-Nov-17 29-Nov-17

24-Dec-17 24-Dec-17

21 21

100%

0 0

10-Dec-17 A 10-Dec-17 A

23-Aug-18 A 18-Aug-18 A

TF

A1445-3

EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS

0

100%

0

22-Mar-18 A

06-Aug-18 A

A1470-1

FOUNDATION WORK (CONCRETE)

0

100%

0

10-Dec-17 A

18-Aug-18 A

A1470-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

10-Dec-17 A

23-Aug-18 A

EXCAVATION (INCLUDING AREA LIGHTING POLES)

0 0

100%

0 0

24-Mar-18 A 24-Mar-18 A

11-Aug-18 A 05-Jul-18 A

A1490-3

FOUNDATION WORK (STEEL FIXING)

0

100%

0

15-Apr-18 A

08-Aug-18 A

A1490-5

FOUNDATION WORK (CONCRETE)

0

100%

0

22-Apr-18 A

08-Aug-18 A

A1490-6

CURING / WATERPROOFING / BACK FILLING

0

100%

0

04-Jun-18 A

11-Aug-18 A

02-Oct-18 A 02-Oct-18 A 02-Oct-18 A

18-Dec-18 03-Dec-18 03-Dec-18

12 15 3

PSV A1445-4

Structural Steel TEST SEPERATOR SEPERAT A2360 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2400

INSTALLATION OF LADDERS, STAIRS, HANDRAILS

16-Jul-18 16-Jul-18 16-Jul-18

04-Aug-18 04-Aug-18 23-Jul-18

17 17 7

15%

47 34 34

01-Aug-18

04-Aug-18

3

0%

17

14-Nov-18

03-Dec-18

15

0 0

15%

37 37

04-Oct-18 A 04-Oct-18 A

06-Dec-18 06-Dec-18

3 3

METERING SKID SK A2360-1 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W PSV A2380

INSTALLATION OF PSV VALVES ACCESS PLATFORMS

PIPE SUPPORT A2370 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS

23-Jul-18 23-Jul-18

28-Jul-18 28-Jul-18

5 5

0%

37 37

10-Oct-18 A 10-Oct-18 A

06-Dec-18 06-Dec-18

22 22

19-Jul-18 19-Jul-18

24-Jul-18 24-Jul-18

5 5

0%

47 47

11-Oct-18 A 11-Oct-18 A

18-Dec-18 18-Dec-18

0 0

0 0

0%

4 4

15-Dec-18 15-Dec-18

18-Dec-18 18-Dec-18

3 3

100%

0 0

05-Sep-18 A 05-Sep-18 A

06-Sep-18 A 06-Sep-18 A

31-Dec-17 A 31-Dec-17 A 31-Dec-17 A

06-Jan-19 17-Feb-18 A 31-Dec-17 A

FIELD INSTRUMENT INSTRUM A2370-1 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2775

INSTALLATION OF NEW TEST SEPARATOR

28-Jun-18 28-Jun-18

15-Jul-18 15-Jul-18

15 15

07-Jul-18

21-Aug-18

40 0 0

100%

24 0 0

A5560

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

0

100%

0

31-Dec-17 A

05-Jan-18 A

A5570

PIPING TIE-IN / NDT

0

100%

0

09-Feb-18 A

14-Feb-18 A

A5580

TIE-IN COMPLETE / REMOVE SCAFFOLD

0

Piping EARLY SHUTDOWN SHUTDO WORKS - Pre Shutdown and Plant Shutdown Tie-in A5550 MOBILIZATION OF OF TEAM APPLY PTW

PIPING -REMAINING -REMA A2920 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT

100%

0

06-Feb-18 A

17-Feb-18 A

07-Jul-18 07-Jul-18

21-Aug-18 09-Aug-18

40 30

0%

24 17

10-Dec-18 10-Dec-18

06-Jan-19 29-Dec-18

5 0

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

11-Aug-18

13-Aug-18

3

0%

7

26-Dec-18

02-Jan-19

8

A2930

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

14-Aug-18

19-Aug-18

5

0%

4

02-Jan-19

06-Jan-19

0

A2950

TIE-IN

14-Aug-18

21-Aug-18

7

0%

4

02-Jan-19

06-Jan-19

0

A2920-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

8

19-Dec-18

27-Dec-18

0

A2951-1

REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV

0

0%

3

03-Jan-19

06-Jan-19

4

25-Aug-18 A 18-Dec-18

12-Jan-19 31-Dec-18

3 6

CABLE GLANDING AND TERMINATION

30-Jun-18 30-Jun-18

08-Sep-18 15-Jul-18

61 14

0%

68 12

A3280

U/G CABLE LAYING

16-Jul-18

23-Jul-18

7

0%

13

06-Dec-18

20-Dec-18

3

A3290

CABLE TRAY INSTALLATION

24-Jul-18

08-Aug-18

14

0%

8

06-Dec-18

15-Dec-18

3

A3300

ELECTRICAL EQUIPMENTS INSTALLATION

09-Aug-18

16-Aug-18

7

0%

12

18-Dec-18

31-Dec-18

3

A3310

CABLE LAYING

18-Aug-18

25-Aug-18

7

0%

17

09-Dec-18

27-Dec-18

3

A3320

LIGHTING FIXTURE AND DB INSTALLATION

18-Aug-18

25-Aug-18

7

0%

6

25-Dec-18

31-Dec-18

3

A3330

ELECTRICAL TIE-INS

26-Aug-18

02-Sep-18

7

0%

5

05-Jan-19

09-Jan-19

3

A3340

ENERGIZATION

03-Sep-18

08-Sep-18

5

0%

3

09-Jan-19

12-Jan-19

3

A3280-2

BACK FILLING OF CABLE TRENCH

0

0%

13

09-Dec-18

23-Dec-18

17

A3310-1

HOOK UP

0

0%

5

31-Dec-18

05-Jan-19

3

A5990

CABLE TRENCHES

0

25%

24

25-Aug-18 A

21-Nov-18

9

A6000

EARTH PIT DRILLING

0

0%

4

13-Nov-18

17-Nov-18

5

22-Nov-18 22-Nov-18

07-Jan-19 12-Dec-18

7 3

Instrument & Control Co A3950 CABLE TRAY AND SUPPORTS INSTALLATION

28-Jul-18 28-Jul-18

18-Dec-18 12-Aug-18

124 14

0%

40 18

M 2

A 3

M 4

2017 J Jul A 5 6 7

S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

20

A2940

Electrical A3270

F 1

29-Nov-18

A3960

INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING

13-Aug-18

20-Aug-18

7

0%

4

02-Jan-19

06-Jan-19

3

A3990

DCS MODIFICATION IN CONTROL ROOM BY VENDOR

14-Aug-18

20-Aug-18

6

0%

9

29-Dec-18

07-Jan-19

3

A3970

INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, PRV & CONTROL VALV

21-Aug-18

28-Aug-18

7

0%

7

26-Dec-18

02-Jan-19

3

A3980

INSTRUMENT CABLE LAYING

29-Aug-18

03-Sep-18

5

0%

18

11-Dec-18

31-Dec-18

3

A4860

INSTALLATION OF DELUGE

04-Sep-18

11-Sep-18

7

0%

4

01-Jan-19

05-Jan-19

9

Page 30 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Page 18 of32

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

A4870

JB INSTALLATION

27-Sep-18

30-Sep-18

3

0%

3

11-Dec-18

13-Dec-18

3

A4790

JB SUPPORT INSTALLATION

16-Dec-18

18-Dec-18

3

0%

3

09-Dec-18

11-Dec-18

3

A3980-2

SS TUBE AND LEAK TEST

0

0%

4

30-Dec-18

02-Jan-19

6

A3970-3

INSTALLATION OF INSTRUMENT VALVE

0

0%

3

26-Dec-18

29-Dec-18

6

A3970-1

FIELD INSTRUMENT INSTALLATION (GAUGES / TRANSMITTERS)

0

0%

6

24-Dec-18

30-Dec-18

3

A3970-2

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

3

29-Dec-18

31-Dec-18

4

A3970-11

CABLE GLAND AND TERMINATION (ALONG JBs)

0

0%

4

25-Dec-18

29-Dec-18

3

A3970-21

CABLE GLAND AND TERMINTATION (ALONG INSTRUMENTS)

0

0%

5

27-Dec-18

01-Jan-19

3

F&G CABLE INSTALLATION

0 0

0%

26 9

09-Dec-18 11-Dec-18

07-Jan-19 20-Dec-18

3 18

A6010

F&G SUPPORTS INSTALLATION

0

0%

4

09-Dec-18

12-Dec-18

23

A6020

F&G DEVICES INSTALLATION

0

0%

4

11-Dec-18

15-Dec-18

23

A6040

F&G JB SUPPORT INSTALLATION

0

0%

3

11-Dec-18

13-Dec-18

23

A6050

F&G JB INSTALLATION

0

0%

3

12-Dec-18

15-Dec-18

23

A6060

F&G CABLE GLANDING AND TERMINATION

0

0%

5

27-Dec-18

01-Jan-19

3

A6070

F&G LOOP PREPARATION

0

0%

2

01-Jan-19

02-Jan-19

3

A6080

F&G LOOP TESTING

0

0%

4

03-Jan-19

07-Jan-19

3

15-Dec-18 15-Dec-18

06-Jan-19 24-Dec-18

11 19

15-Dec-18

27-Dec-18

19

F&G System A6030

Painting & Fireproofing Firep A4300 STRUCTURAL STEEL PAINTING AND TOUCH-UP

24-Jul-18 24-Jul-18

21-Aug-18 31-Jul-18

25 7

0%

20 9

7

0%

12

A4320

FIREPROOFING FOR STRUCTURAL STEEL

01-Aug-18

08-Aug-18

A4310

PIPING PAINTING AND TOUCH-UP

14-Aug-18

21-Aug-18

7

0%

8

29-Dec-18

06-Jan-19

8

14-Aug-18 14-Aug-18

16-Oct-18 16-Aug-18

55 3

0%

75 4

09-Sep-18 A 02-Jan-19

20-Jan-19 06-Jan-19

0 3

Pre-commisionin Pre-commisioning A2951 INST LOOP AND FUNCTIONAL TEST A4560

PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING

23-Sep-18

30-Sep-18

7

17%

58

09-Sep-18 A

31-Dec-18

4

A4600

ELECTRICAL LIGHTING TEST

23-Sep-18

16-Oct-18

21

0%

5

06-Jan-19

10-Jan-19

0

A4570

LEAK TEST FOR PIPING AND SEPARATOR

30-Sep-18

02-Oct-18

3

0%

4

12-Jan-19

15-Jan-19

0

A4580

PUNCHLIST

03-Oct-18

06-Oct-18

3

0%

4

16-Jan-19

20-Jan-19

0

A4570-1

DELUGE SKID FUNCTIONAL TESTING

0

0%

3

09-Jan-19

12-Jan-19

0

20-Jan-19 20-Jan-19

29-Jan-19 20-Jan-19

0 0 0

START OF PRODUCTION

17-Oct-18 17-Oct-18

30-Oct-18 20-Oct-18

11 3

0%

9 1

A4960

COMMISSIONING AND STARTUP

22-Oct-18

24-Oct-18

3

0%

5

20-Jan-19

24-Jan-19

A4970

PERFORMANCE TESTS

24-Oct-18

30-Oct-18

7

0%

5

24-Jan-19

29-Jan-19

0

02-Oct-18 02-Oct-18

22-Oct-18 04-Oct-18

17 3

26-Jan-19 26-Jan-19

13-Mar-19 29-Jan-19

59 59

Commissioning A4950

0%

41 4

D0010

DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)

06-Oct-18

07-Oct-18

2

0%

2

29-Jan-19

30-Jan-19

59

D0030

APPLY ANTI RUST TO FOUNDATION BOTLS

08-Oct-18

09-Oct-18

1

0%

3

30-Jan-19

02-Feb-19

59

D0020

COLD CUTTING INLET AND OUTLET PIPING

09-Oct-18

13-Oct-18

3

0%

21

02-Feb-19

25-Feb-19

59

D0040

UNBOLD & REMOVE EXISTING SEPARATOR

13-Oct-18

16-Oct-18

3

0%

3

25-Feb-19

27-Feb-19

59

D0050

REMOVE CONCRETE FOUNDATION / GRADE THE AREA

16-Oct-18

22-Oct-18

5

0%

12

28-Feb-19

13-Mar-19

59

D0060

DEMOLITION WORKS COMPLETE

22-Oct-18

0

0%

0

13-Mar-19

59

29-Nov-17

08-Nov-18

294

117

03-Dec-17 A

10-Mar-19

62

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F0010 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR

26-Dec-17 30-Dec-17 30-Dec-17 30-Dec-17

08-Feb-18 23-Jan-18 11-Jan-18 11-Jan-18

39 22 12 12

98%

44 23 23 23

07-Jun-18 A 07-Jun-18 A 06-Sep-18 A 06-Sep-18 A

15-Dec-18 20-Nov-18 20-Nov-18 20-Nov-18

14 22 0 0

METERING SKID SK F0040 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER

20-Jan-18 20-Jan-18

23-Jan-18 23-Jan-18

4 4

100%

0 0

08-Aug-18 A 08-Aug-18 A

15-Oct-18 A 15-Oct-18 A

PSV F0030

16-Jan-18 16-Jan-18

18-Jan-18 18-Jan-18

3 3

100%

0 0

09-Aug-18 A 09-Aug-18 A

23-Oct-18 A 23-Oct-18 A

13-Jan-18 13-Jan-18

15-Jan-18 15-Jan-18

3 3

99%

16 16

07-Jun-18 A 07-Jun-18 A

12-Nov-18 12-Nov-18

0

100%

0

13-Aug-18 A

03-Sep-18 A

26-Dec-17 26-Dec-17 26-Dec-17

08-Feb-18 08-Feb-18 24-Jan-18

39 39 26

0%

44 44 40

27-Sep-18 A 27-Sep-18 A 08-Oct-18 A

15-Dec-18 15-Dec-18 10-Dec-18

14 14 14

23-Jan-18

08-Feb-18

15

0%

9

05-Dec-18

15-Dec-18

14

0

100%

0

Demolition Works Work D0000 WORK PERMIT APPROVED FOR DEMOLITION

KAHM

FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFE

PIPE SUPPORT F0020 FAB. OF PIPESUPPORT STRUCTURE SHIFT TO SITE F0020-1

FABRICATION OF INSTRUMENT STANCHION SUPPORTS

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F0080 PIPING FABRICATION & FBE COATING AT KUWAIT F0110

FBE PIPING BULK DELIVER AT SITE

F0080-00

PIPE DELIVER AT KUWAIT

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

29 29

27-Sep-18 A

Page 31 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

REMANING PIPING PIP (NON FBE) F0080-000 PIPE DELIVER AT FAB FACILITY

Page 19 of32

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

0 0

42 0

27-Sep-18 A

12-Dec-18 27-Sep-18 A

8

100%

8

F0080-1

COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATIN

0

0%

38

24-Oct-18 A

08-Dec-18

F0110-1

FABRICATION SPOOLS DELIVER TO SITE

0

0%

13

28-Nov-18

12-Dec-18

8

03-Dec-17 A 03-Dec-17 A 17-Feb-18 A 17-Feb-18 A

14-Jan-19 14-Jan-19 14-Jan-19 02-Apr-18 A

20 6 6

GRADING

29-Nov-17 29-Nov-17 29-Nov-17 29-Nov-17

100%

70 70 70 0

A1650

CABLE TRENCHES AND UTILITY ROAD CROSSINGS

08-Feb-18

05-Mar-18

21

10%

24

25-Sep-18 A

21-Nov-18

7

A1700

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL

05-Mar-18

08-Mar-18

3

95%

10

04-Aug-18 A

05-Nov-18

7

A1660

DRAINAGE PIPE CULVERTS

01-Oct-18

16-Oct-18

14

0%

36

16-Oct-18 A

05-Dec-18

30

A1670

ROAD SAFETY CRASH BARRIERS AND BOLLARD

01-Oct-18

24-Oct-18

21

0%

9

05-Jan-19

14-Jan-19

6

A1690

PAVING&GRADING(GRAVEL FILL)

14-Oct-18

16-Oct-18

3

0%

9

05-Jan-19

14-Jan-19

6

A1640

ROADS AND PAVING(INCLUDING MODIFICATIONS)

17-Oct-18

01-Nov-18

14

0%

10

03-Jan-19

14-Jan-19

6

A1580-1

PROTECTION OF UNDERGROUND CABLES

0

50%

24

23-Sep-18 A

21-Nov-18

7

29-Nov-17 29-Nov-17

09-Jan-18 06-Dec-17

35 7

100%

0 0

17-Feb-18 A 17-Feb-18 A

18-Aug-18 A 02-Apr-18 A

07-Dec-17

09-Jan-18

28

INSTALLATION Civil Works COMMOMN A1580

TEST SEPERATOR SEPERAT A1585 EXCAVATION FOR THE MAIN FOUNDATIONS

01-Nov-18 01-Nov-18 01-Nov-18 04-Dec-17

289 289 289 5

A1590

FOUNDATION WORK (STEEL FIXING)

100%

0

19-May-18 A

18-Jul-18 A

A1590-1

FOUNDATION WORK (CONCRETE)

0

100%

0

01-Apr-18 A

04-Aug-18 A

A1590-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

09-Jul-18 A

18-Aug-18 A

0 0

100%

0 0

17-Feb-18 A 19-May-18 A

20-Sep-18 A 18-Jul-18 A

TEST SEPERAT SEPERATOR PLATFORM A1590-3 FOUNDATION WORK (STEEL FIXING) A1590-4

FOUNDATION WORK (CONCRETE)

0

100%

0

01-Apr-18 A

04-Aug-18 A

A1590-5

CURING / WATERPROOFING / BACK FILLING

0

100%

0

09-Jul-18 A

20-Sep-18 A

A1585-1

EXCAVATION FOR THE MAIN FOUNDATIONS

0

100%

0

17-Feb-18 A

02-Apr-18 A

7 7

100%

0 0

03-Mar-18 A 19-May-18 A

18-Sep-18 A 18-Jul-18 A

METERING SKID SK A1630 FOUNDATION WORK (STEEL FIXING)

04-Feb-18 04-Feb-18

11-Feb-18 11-Feb-18

A1585-2

EXCAVATION

0

100%

0

03-Mar-18 A

01-Apr-18 A

A1630-1

FOUNDATION WORK (CONCRETE)

0

100%

0

01-Apr-18 A

02-Aug-18 A

A1630-2

CURING / WATERPROOFING / BACK FILLING

0

PIPE SUPPORT A1610 FOUNDATION WORK (STEEL FIXING)

10-Jan-18 10-Jan-18

03-Feb-18 03-Feb-18

100%

0

01-Jul-18 A

18-Sep-18 A

21 21

100%

0 0

03-Dec-17 A 16-Dec-17 A

29-Aug-18 A 25-Aug-18 A

A1610-1

FOUNDATION WORK (CONCRETE)

0

100%

0

16-Dec-17 A

27-Aug-18 A

A1610-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

16-Dec-17 A

29-Aug-18 A

A1585-3

EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS

0

100%

0

03-Dec-17 A

18-Jul-18 A

17-Feb-18 A 20-May-18 A

13-Sep-18 A 25-Aug-18 A

20-May-18 A

26-Aug-18 A

FOUNDATION WORK (STEEL FIXING)

0 0

100%

0 0

A1630-4

FOUNDATION WORK (CONCRETE)

0

100%

0

A1630-5

CURING / WATERPROOFING / BACK FILLING

0

100%

0

02-Jul-18 A

13-Sep-18 A

A1585-4

EXCAVATION (INCLUDING AREA LIGHTING POLES)

0

100%

0

17-Feb-18 A

21-Jun-18 A

32 31 31

04-Oct-18 A 14-Oct-18 A 14-Oct-18 A

01-Dec-18 29-Nov-18 29-Nov-18

PSV A1630-3

02-Aug-18 02-Aug-18 02-Aug-18

21-Aug-18 21-Aug-18 09-Aug-18

17 17 7

15%

19-Aug-18

21-Aug-18

3

0%

9

20-Nov-18

29-Nov-18

0

METERING SKID SK A2430 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W

06-Aug-18 06-Aug-18

11-Aug-18 11-Aug-18

5 5

10%

10 10

04-Oct-18 A 04-Oct-18 A

12-Nov-18 12-Nov-18

19 19

PSV A2440

09-Aug-18 09-Aug-18

14-Aug-18 14-Aug-18

5 5

0%

8 8

08-Nov-18 08-Nov-18

17-Nov-18 17-Nov-18

13 13

15-Aug-18 15-Aug-18

18-Aug-18 18-Aug-18

3 3

0%

16 16

13-Nov-18 13-Nov-18

01-Dec-18 01-Dec-18

13 13

0 0

0%

6 6

25-Nov-18 25-Nov-18

01-Dec-18 01-Dec-18

13 13

100%

0 0

16-Oct-18 A 16-Oct-18 A

18-Oct-18 A 18-Oct-18 A

31-Dec-17 A 31-Dec-17 A 31-Dec-17 A

30-Dec-18 17-Feb-18 A 31-Dec-17 A

31-Dec-17 A

05-Jan-18 A

Structural Steel TEST SEPERATOR SEPERAT A2420 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2460

INSTALLATION OF LADDERS, STAIRS, HANDRAILS

INSTALLATION OF PSV VALVES ACCESS PLATFORMS

PIPE SUPPORT A2450 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS FIELD INSTRUMENT INSTRUM A2450-1 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2795

INSTALLATION OF NEW TEST SEPARATOR

Piping EARLY SHUTDOWN SHUTDO WORKS - Pre Shutdown and Plant Shutdown Tie-in A5590 MOBILIZATION OF OF TEAM APPLY PTW A5600

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

16-Jul-18 16-Jul-18

01-Aug-18 01-Aug-18

15 15

02-Aug-18

17-Sep-18

40 0 0

100%

27 0 0

0

100%

0

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

21 22 22

24

Page 32 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

Page 20 of32

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

A5610

PIPING TIE-IN / NDT

0

100%

0

09-Feb-18 A

14-Feb-18 A

A5620

TIE-IN COMPLETE / REMOVE SCAFFOLD

0

100%

0

06-Feb-18 A

17-Feb-18 A

29-Nov-18 26-Dec-18

30-Dec-18 30-Dec-18

13 8

PIPING -REMAINING -REMA A2980 INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

02-Aug-18 02-Aug-18

17-Sep-18 08-Aug-18

40 6

0%

27 4

A2970

PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT

11-Aug-18

02-Sep-18

20

0%

20

29-Nov-18

22-Dec-18

8

A2990

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

03-Sep-18

05-Sep-18

3

0%

9

17-Dec-18

26-Dec-18

8

A3000

TIE-IN

06-Sep-18

17-Sep-18

10

0%

4

26-Dec-18

30-Dec-18

8

A2970-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

9

11-Dec-18

20-Dec-18

21

A3001-1

REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV

0

Electrical A3360

CABLE GLANDING AND TERMINATION

15-Jan-18 15-Jan-18

25-Sep-18 31-Jan-18

0%

3

27-Dec-18

30-Dec-18

9

218 14

0%

47 12

17-Nov-18 15-Dec-18

09-Jan-19 27-Dec-18

2 6

A3370

U/G CABLE LAYING

31-Jan-18

08-Feb-18

7

0%

14

28-Nov-18

13-Dec-18

2

A3380

CABLE TRAY INSTALLATION

11-Aug-18

26-Aug-18

14

0%

9

25-Nov-18

04-Dec-18

0

A3390

ELECTRICAL EQUIPMENTS INSTALLATION

27-Aug-18

03-Sep-18

7

0%

12

15-Dec-18

27-Dec-18

2

A3400

CABLE LAYING

04-Sep-18

11-Sep-18

7

0%

15

10-Dec-18

26-Dec-18

2

A3410

LIGHTING FIXTURES AND DB INSTALLATION

04-Sep-18

11-Sep-18

7

0%

6

22-Dec-18

27-Dec-18

2

A3420

ELECTRICAL TIE-INS

12-Sep-18

19-Sep-18

7

0%

4

02-Jan-19

06-Jan-19

2

A3430

ENERGIZATION

20-Sep-18

25-Sep-18

5

0%

3

07-Jan-19

09-Jan-19

2

A3370-1

BACK FILLING OF CABLE TRENCH

0

0%

12

15-Dec-18

27-Dec-18

10

A3400-1

HOOK UP

0

0%

4

29-Dec-18

01-Jan-19

2

A3440

EARTH PIT DRILLING

0

Instrument & Control Co A4040 MODIFICATION OF EXISTING DCS SYSTEMS BY VENDOR

0%

4

17-Nov-18

20-Nov-18

5

02-Aug-18 02-Aug-18

09-Oct-18 15-Aug-18

59 12

0%

40 9

26-Nov-18 23-Dec-18

10-Jan-19 01-Jan-19

3 4

A4000

CABLE TRAY AND SUPPORT INSTALLATION

14-Aug-18

29-Aug-18

14

0%

16

26-Nov-18

13-Dec-18

0

A4010

INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING

30-Aug-18

06-Sep-18

7

0%

4

07-Jan-19

10-Jan-19

0

A4020

INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, PRV AND CONTROL VA

08-Sep-18

15-Sep-18

7

0%

7

25-Dec-18

01-Jan-19

0

A4030

INSTRUMENT CABLE LAYING

16-Sep-18

20-Sep-18

5

0%

18

05-Dec-18

25-Dec-18

0

A5280

INSTALLATION OF DELUGE

22-Sep-18

29-Sep-18

7

0%

6

01-Jan-19

07-Jan-19

6

A4590

JB SUPPORT INSTALLATION

07-Oct-18

09-Oct-18

3

0%

3

11-Dec-18

13-Dec-18

23

A4030-1

SS TUBE INSTALLATION AND LEAK TEST

0

0%

4

02-Jan-19

06-Jan-19

0

A4020-3

INSTALLATION OF INSTRUMENT VALVE

0

0%

4

01-Jan-19

05-Jan-19

1

A4020-1

FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)

0

0%

7

25-Dec-18

01-Jan-19

0

A4020-2

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

3

30-Dec-18

01-Jan-19

4

A5350

JB INSTALLATION

0

0%

3

15-Dec-18

17-Dec-18

23

A4020-11

CABLE GLAND TERMINATION (ALONG INSRUMENT)

0

0%

6

30-Dec-18

05-Jan-19

3

A4020-21

CABLE GLAND TERMINATION (ALONG JBs)

0

0%

7

30-Dec-18

06-Jan-19

0

F&G SUPPORT INSTALLATION

0 0

0%

28 4

10-Dec-18 10-Dec-18

10-Jan-19 13-Dec-18

3 25

A6110

F&G DEVICES INSTALLATION

0

0%

4

12-Dec-18

16-Dec-18

25

A6120

F&G CABLE INSTALLATION

0

0%

9

16-Dec-18

25-Dec-18

17

A6130

F&G JB SUPPORT INSTALLATION

0

0%

2

15-Dec-18

16-Dec-18

25

A6140

F&G JB INSTALLATION

0

0%

2

17-Dec-18

18-Dec-18

23

A6150

F&G CABLE GLANDING AND TERMINATION

0

0%

5

31-Dec-18

05-Jan-19

3

A6160

F&G LOOP PREPARATION

0

0%

2

05-Jan-19

06-Jan-19

3

A6170

F&G LOOP TESTING

0

0%

4

07-Jan-19

10-Jan-19

3

28-Nov-18 28-Nov-18

29-Dec-18 08-Dec-18

34 41

F&G System A6100

0%

27 9

A4350

FIREPROOFING FOR STRUCTURAL STEEL

19-Aug-18

26-Aug-18

7

0%

17

02-Dec-18

20-Dec-18

41

A4340

PIPING PAINTING AND TOUCH-UP

06-Sep-18

13-Sep-18

7

0%

7

22-Dec-18

29-Dec-18

17

22-Aug-18 22-Aug-18

27-Sep-18 29-Aug-18

32 7

17%

74 58

09-Sep-18 A 09-Sep-18 A

19-Jan-19 31-Dec-18

0 6

Painting & Fireproofing Firep A4330 STRUCTURAL STEEL PAINTING AND TOUCH-UP

Pre-commisionin Pre-commisioning A4510 PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING

11-Aug-18 11-Aug-18

13-Sep-18 18-Aug-18

30 7

A3001

INST LOOP AND FUNCITONAL TEST

06-Sep-18

09-Sep-18

3

0%

4

07-Jan-19

10-Jan-19

0

A4520

DELUGE SKID FUNCTIONAL TEST

12-Sep-18

15-Sep-18

3

0%

3

12-Jan-19

14-Jan-19

0

A4550

ELECTRICAL LIGHITING TEST

12-Sep-18

27-Sep-18

14

0%

5

09-Jan-19

14-Jan-19

0

A4530

PUNCHLIST

16-Sep-18

18-Sep-18

3

0%

4

15-Jan-19

19-Jan-19

0

A4520-1

LEAK TEST FOR SEPARATOR AND PIPING

0

0%

5

10-Jan-19

15-Jan-19

0

8

19-Jan-19

27-Jan-19

0

Commissioning

29-Sep-18

08-Oct-18

8

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 33 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule.

Page 21 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

A4890

START OF PRODUCTION

29-Sep-18

01-Oct-18

3

0%

2

19-Jan-19

20-Jan-19

0

A4900

COMMISSIONING AND STARTUP

30-Sep-18

02-Oct-18

3

0%

4

19-Jan-19

22-Jan-19

0

A4910

PERFORMANCE TESTS

02-Oct-18

08-Oct-18

7

0%

5

22-Jan-19

27-Jan-19

0

20-Oct-18 20-Oct-18

08-Nov-18 22-Oct-18

17 3

24-Jan-19 24-Jan-19

10-Mar-19 27-Jan-19

62 62

0%

39 3

DM1010

DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)

23-Oct-18

24-Oct-18

2

0%

3

27-Jan-19

29-Jan-19

62

DM1030

APPLY ANTI RUST TO FOUNDATION BOTLS

25-Oct-18

27-Oct-18

1

0%

2

29-Jan-19

30-Jan-19

62

DM1020

COLD CUTTING INLET AND OUTLET PIPING

27-Oct-18

30-Oct-18

3

0%

21

30-Jan-19

23-Feb-19

62

DM1040

UNBOLD & REMOVE EXISTING SEPARATOR

30-Oct-18

03-Nov-18

3

0%

2

23-Feb-19

24-Feb-19

62

DM1050

REMOVE CONCRETE FOUNDATION / GRADE THE AREA

03-Nov-18

08-Nov-18

5

0%

13

24-Feb-19

10-Mar-19

62

DM1060

DEMOLITION WORKS COMPLETE

0%

Demolition Works Work DM1000 WORK PERMIT APPROVED FOR DEMOLITION

08-Nov-18

0

10-Mar-19

62

20-Feb-18

28-Nov-18

302

229

05-Jun-18 A

26-May-19

61

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F330 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR

24-Mar-18 24-Mar-18 24-Mar-18 24-Mar-18

14-May-18 17-Apr-18 05-Apr-18 05-Apr-18

45 22 12 12

40%

64 56 48 48

02-Sep-18 A 02-Sep-18 A 11-Sep-18 A 11-Sep-18 A

09-Jan-19 31-Dec-18 22-Dec-18 22-Dec-18

44 52 0 0

METERING SKID SK F340 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER

07-Apr-18 07-Apr-18

09-Apr-18 09-Apr-18

3 3

80%

48 48

11-Sep-18 A 11-Sep-18 A

22-Dec-18 22-Dec-18

0 0

PSV F350

10-Apr-18 10-Apr-18

12-Apr-18 12-Apr-18

3 3

20%

48 48

12-Sep-18 A 12-Sep-18 A

22-Dec-18 22-Dec-18

0 0

10-Apr-18 10-Apr-18

17-Apr-18 17-Apr-18

7 7

56 0

02-Sep-18 A 02-Sep-18 A

31-Dec-18 16-Sep-18 A

52

100%

14-Apr-18

17-Apr-18

4

30%

56

20-Sep-18 A

31-Dec-18

52

31-Mar-18 31-Mar-18 31-Mar-18

14-May-18 14-May-18 30-Apr-18

39 39 27

0%

45 38 29

27-Sep-18 A 27-Sep-18 A 11-Oct-18 A

09-Jan-19 01-Jan-19 22-Dec-18

0 0 0

28-Apr-18

14-May-18

15

0%

9

23-Dec-18

01-Jan-19

0

0

100%

0

0 0

0%

37 33

06-Oct-18 A 28-Nov-18

09-Jan-19 05-Jan-19

0 0

0

0%

13

26-Dec-18

09-Jan-19

0

0

JALM

FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFE

PIPE SUPPORT F370 FABRICATION OF INSTRUMENT STANCHION SUPPORTS F360

FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATI

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F400 PIPING FABRICATION & FBE COATING AT KUWAIT F430

FBE PIPING BULK DELIVER AT SITE

F400-00

PIPE DELIVER AT KUWAIT

REMAINING PIPING PI (NON FBE0 F400-1 COMPLETE PIPING FABRICATION HYDROTEST/ PAINTING & COATING F430-1

FABRICATION SPOOLS DELIVER TO SITE

F400-000

PIPE DELIVER AT FAB FACILITY

INSTALLATION Civil Works COMMOMN A1840

GRADING

20-Feb-18 20-Feb-18 20-Feb-18 20-Feb-18

0

100%

0

26-Nov-18 26-Nov-18 26-Nov-18 25-Feb-18

300 240 240 5

05-Jun-18 A 05-Jun-18 A 05-Jun-18 A 05-Jun-18 A

31-Mar-19 31-Mar-19 31-Mar-19 12-Jun-18 A

15 12 12

100%

169 135 135 0

CABLE TRENCHES AND UTILITY ROAD CROSSINGS

03-Apr-18

26-Apr-18

21

0%

51

18-Oct-18 A

23-Dec-18

17

DRAINAGE PIPE CULVERTS

03-Nov-18

18-Nov-18

14

0%

11

09-Dec-18

20-Dec-18

80

A1930

ROAD SAFETY CRASH BARRIERS AND BOLLARD

03-Nov-18

26-Nov-18

21

0%

13

17-Mar-19

31-Mar-19

12

A1935

NEW RETAINING WALLS

05-Nov-18

12-Nov-18

7

0%

14

13-Mar-19

28-Mar-19

10

A1936

RE-INSTATEMENT OF EXISTING ASPHALT ROAD

13-Nov-18

20-Nov-18

7

0%

14

13-Mar-19

28-Mar-19

10

A1938

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

21-Nov-18

24-Nov-18

3

0%

13

17-Mar-19

31-Mar-19

12

A1937

CONCRETE KERB

21-Nov-18

24-Nov-18

3

0%

14

13-Mar-19

28-Mar-19

10

A1840-1

PROTECTION OF UNDERGROUND CABLES

0

0%

5

04-Dec-18

09-Dec-18

27

A1845-6

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL

0

5

70%

24

23-Aug-18 A

21-Nov-18

26-Feb-18 26-Feb-18

07-Apr-18 05-Mar-18

35 7

100%

0 0

12-Jun-18 A 12-Jun-18 A

08-Oct-18 A 09-Aug-18 A

06-Mar-18

07-Apr-18

28

A1850

FOUNDATION WORK (STEEL FIXING)

100%

0

10-Jul-18 A

19-Aug-18 A

A1850-1

FOUNDATION WORK (CONCRETE)

0

100%

0

13-Aug-18 A

23-Aug-18 A

A1850-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

26-Aug-18 A

08-Oct-18 A

TEST SEPERAT SEPERATOR PLATFORM A1845-1 EXCAVATION FOR THE MAIN FOUNDATIONS

0 0

100%

0 0

27-Jul-18 A 27-Jul-18 A

25-Sep-18 A 11-Aug-18 A

A1850-3

FOUNDATION WORK (STEEL FIXING)

0

100%

0

12-Aug-18 A

03-Sep-18 A

A1850-4

FOUNDATION WORK (CONCRETE)

0

100%

0

03-Sep-18 A

22-Sep-18 A

A1850-5

CURING / WATERPROOFING / BACK FILLING

0

100%

0

11-Sep-18 A

25-Sep-18 A

7 7

100%

0 0

12-Jun-18 A 03-Jul-18 A

27-Sep-18 A 31-Jul-18 A

0

100%

0

09-Jul-18 A

05-Aug-18 A

A1890-1

FOUNDATION WORK (CONCRETE)

19-Apr-18 19-Apr-18

26-Apr-18 26-Apr-18

A 3

M 4

2017 J Jul A 5 6 7

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

06-Oct-18 A

A1920

METERING SKID SK A1890 FOUNDATION WORK (STEEL FIXING)

M 2

17:46

27-Sep-18 A

A1910

TEST SEPERATOR SEPERAT A1845 EXCAVATION FOR THE MAIN FOUNDATIONS

F 1

29-Nov-18

Page 34 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Page 22 of32 Act. Fin / F-C Fin

TF

A1845-2

EXCAVATION / Blinidng

0

100%

0

12-Jun-18 A

05-Jul-18 A

A1890-3

CURING / WATERPROOFING / BACK FILLING

0

100%

0

08-Aug-18 A

27-Sep-18 A

0 0

98%

53 25

09-Jul-18 A 03-Aug-18 A

25-Dec-18 22-Nov-18

0 0

PIPE SUPPORT A1845-3 EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS A1870-1

FOUNDATION WORK (STEEL FIXING)

0

92%

37

09-Jul-18 A

06-Dec-18

0

A1870-2

FOUNDATION WORK (CONCRETE)

0

75%

45

10-Sep-18 A

16-Dec-18

0

A1870-3

CURING / WATERPROOFING / BACK FILLING

0

60%

53

20-Sep-18 A

25-Dec-18

0

05-Jun-18 A 05-Jun-18 A

03-Oct-18 A 06-Sep-18 A

EXCAVATION

0 0

100%

0 0

A1890-4

FOUNDATION WORK (STEEL FIXING)

0

100%

0

09-Jul-18 A

13-Sep-18 A

A1890-5

FOUNDATION WORK (CONCRETE)

0

100%

0

16-Aug-18 A

16-Sep-18 A

A1890-6

CURING / WATERPROOFING / BACK FILLING

0

PSV A1845-4

100%

0

03-Sep-18 A

03-Oct-18 A

06-Sep-18 06-Sep-18 06-Sep-18

25-Sep-18 25-Sep-18 13-Sep-18

17 17 7

0%

68 64 64

07-Oct-18 A 07-Oct-18 A 07-Oct-18 A

14-Jan-19 09-Jan-19 09-Jan-19

14 2 2

23-Sep-18

25-Sep-18

3

0%

8

01-Jan-19

09-Jan-19

2

METERING SKID SK A2550 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W

10-Sep-18 10-Sep-18

15-Sep-18 15-Sep-18

5 5

0%

12 12

01-Jan-19 01-Jan-19

14-Jan-19 14-Jan-19

2 2

PSV A2560

13-Sep-18 13-Sep-18

18-Sep-18 18-Sep-18

5 5

0%

12 12

01-Jan-19 01-Jan-19

14-Jan-19 14-Jan-19

0 0

19-Sep-18 19-Sep-18

22-Sep-18 22-Sep-18

3 3

0%

16 16

27-Dec-18 27-Dec-18

14-Jan-19 14-Jan-19

0 0

0 0

0%

4 4

10-Jan-19 10-Jan-19

14-Jan-19 14-Jan-19

14 14

100%

0 0

10-Sep-18 A 10-Sep-18 A

14-Oct-18 A 14-Oct-18 A

79 60 32

01-Jan-19 01-Jan-19 01-Jan-19

15-Mar-19 11-Mar-19 06-Feb-19

Structural Steel TEST SEPERATOR SEPERAT A2540 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2580

INSTALLATION OF LADDERS, STAIRS, HANDRAILS

INSTALLATION OF PSV VALVES ACCESS PLATFORMS

PIPE SUPPORT A2570 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS FIELD INSTRUMENT INSTRUM A2570-1 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2835

INSTALLATION OF NEW TEST SEPARATOR

Piping PIPING -REMAINING -REMA A3070 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT

20-Aug-18 20-Aug-18

05-Sep-18 05-Sep-18

15 15

27-Aug-18 27-Aug-18 27-Aug-18

08-Oct-18 27-Sep-18 18-Sep-18

46 28 20

0%

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

06-Sep-18

12-Sep-18

6

0%

5

06-Mar-19

11-Mar-19

11

A3090

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

13-Sep-18

16-Sep-18

3

0%

12

07-Feb-19

20-Feb-19

30

A3100

TIE-IN

17-Sep-18

27-Sep-18

10

0%

6

05-Mar-19

11-Mar-19

8

A3070-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

9

27-Jan-19

05-Feb-19

5

A3101-1

REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV

0

0%

3

09-Mar-19

11-Mar-19

8

MOBILIZATION OF HOT TAPPING SUB CONTRACTOR

18-Sep-18 18-Sep-18

08-Oct-18 20-Sep-18

18 3

0%

17 3

10-Feb-19 10-Feb-19

28-Feb-19 12-Feb-19

1 1

HT1090

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

22-Sep-18

02-Oct-18

10

0%

7

12-Feb-19

19-Feb-19

1

HT1100

FLARE TAPPING / NDT

03-Oct-18

06-Oct-18

3

0%

9

19-Feb-19

28-Feb-19

1

HT1110

FLARE TAPPING COMPLETE / REMOVE SCAFFOLD

07-Oct-18

08-Oct-18

2

0%

5

24-Feb-19

28-Feb-19

1

0 0

0%

24 2

21-Feb-19 04-Mar-19

15-Mar-19 05-Mar-19

0 0

Pre Shutdown and Plant Shutdown Tie-in A3100-2 MOBILIZATION OF OF TEAM APPLY PTW A3100-3

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

0

0%

6

05-Mar-19

11-Mar-19

0

A3100-4

PIPING TIE-IN / NDT PRE SHUT DOWN

0

0%

7

21-Feb-19

28-Feb-19

0

A3100-5

PIPING TIE-IN / NDT SHUT DOWN

0

0%

11

05-Mar-19

15-Mar-19

0

212 14

0%

84 10

25-Nov-18 05-Feb-19

02-Mar-19 16-Feb-19

2 5

CABLE GLAND AND TERMINATION

26-Feb-18 26-Feb-18

30-Oct-18 13-Mar-18

A3550

U/G CABLE LAYING

14-Mar-18

21-Mar-18

7

0%

13

12-Jan-19

26-Jan-19

4

A3560

CABLE TRAY INSTALLATION

15-Sep-18

30-Sep-18

14

0%

8

10-Jan-19

19-Jan-19

2

A3570

ELECTRICAL EQUIPMENTS INSTALLATION

01-Oct-18

08-Oct-18

7

0%

12

03-Feb-19

16-Feb-19

2

A3580

CABLE LAYING

09-Oct-18

16-Oct-18

7

0%

20

15-Jan-19

06-Feb-19

2

A3590

LIGHTING FIXTURES AND DB INSTALLATION

09-Oct-18

16-Oct-18

7

0%

6

10-Feb-19

16-Feb-19

2

A3600

ELECTRICAL TIE-INS

17-Oct-18

24-Oct-18

7

0%

6

20-Feb-19

26-Feb-19

2

A3610

ENERGIZATION

25-Oct-18

30-Oct-18

5

0%

4

26-Feb-19

02-Mar-19

2

A3580-1

HOOK UP

0

0%

4

17-Feb-19

20-Feb-19

2

A3550-1

BACK FILLING OF CABLE TRENCH

0

0%

13

26-Jan-19

09-Feb-19

4

A6180

CABLE TRENCHES

0

0%

25

25-Nov-18

23-Dec-18

5

A6190

EARTH PIT DRILLING

0

0%

6

04-Dec-18

10-Dec-18

5

55

29-Dec-18

02-Mar-19

0

Electrical A3540

Instrument & Control Co

06-Sep-18

03-Nov-18

50

M 2

A 3

M 4

2017 J Jul A 5 6 7

S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

14 14 0

A3080

HOT TAPPING HT1080

F 1

29-Nov-18

Page 35 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

Page 23 of32

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

A4140

DCS MODIFICATION IN CONTROL ROOM BY VENDOR

06-Sep-18

12-Sep-18

6

0%

5

20-Feb-19

25-Feb-19

4

A4100

CABLE TRAY AND SUPPORTS INSTALLATION

18-Sep-18

03-Oct-18

14

0%

17

29-Dec-18

16-Jan-19

3

A4540

JB SUPPORT INSTALLATION

19-Sep-18

22-Sep-18

3

0%

3

16-Jan-19

19-Jan-19

3

A4880

JB INSTALLATION

28-Sep-18

01-Oct-18

3

0%

3

20-Jan-19

22-Jan-19

3

A4110

INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST

04-Oct-18

11-Oct-18

7

0%

5

25-Feb-19

02-Mar-19

0

A4120

INSTRUMENT EQUIPEMNT INSTALLATION

13-Oct-18

20-Oct-18

7

0%

20

24-Jan-19

16-Feb-19

4

A4130

INSTRUMENT CABLE LAYING

21-Oct-18

25-Oct-18

5

0%

18

12-Jan-19

31-Jan-19

4

A5310

INSTALLATION OF DELUGE

27-Oct-18

03-Nov-18

7

0%

8

12-Feb-19

20-Feb-19

3

A4130-1

SS TUBE AND LEAK TEST

0

0%

4

21-Feb-19

25-Feb-19

3

A4120-2

INSTALLATION OF INSTRUMENT VALVE

0

0%

5

19-Feb-19

24-Feb-19

0

A4120-1

FIELD INSTRUMENT INSTALLATION (GAUGES / TRANSMITTERS)

0

0%

18

30-Jan-19

19-Feb-19

4

A4120-3

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

2

14-Feb-19

16-Feb-19

7

A4120-11

CABLE GLANDING AND TERMINATION (ALONG JBs)

0

0%

6

31-Jan-19

06-Feb-19

3

A4120-21

CABLE GLANDING AND TERMINATION (ALONG INTSTRUMENTS)

0

0%

6

19-Feb-19

25-Feb-19

4

12-Jan-19 13-Jan-19

02-Mar-19 16-Jan-19

16 52

F&G SUPPORT INSTALLATION

0 0

0%

43 4

A6210

F&G DEVICES INSTALLATION

0

0%

4

15-Jan-19

19-Jan-19

52

A6230

F&G CABLE INSTALLATION

0

0%

9

12-Jan-19

21-Jan-19

50

A6220

F&G JB SUPPORT INSTALLATION

0

0%

2

20-Jan-19

21-Jan-19

50

A6240

F&G JB INSTALLATION

0

0%

2

22-Jan-19

23-Jan-19

48

A6250

F&G CABLE GLANDING AND TERMINATION

0

0%

4

21-Feb-19

25-Feb-19

16

A6260

F&G LOOP PREPARATION

0

0%

2

26-Feb-19

27-Feb-19

16

A6270

F&G LOOP TESTING

0

F&G System A6200

Painting & Fireproofing Firep A4390 STRUCTURAL STEEL PAINTING AND TOUCH-UP

0%

3

27-Feb-19

02-Mar-19

16

15-Sep-18 15-Sep-18

30-Sep-18 22-Sep-18

14 7

0%

17 13

06-Feb-19 06-Feb-19

25-Feb-19 20-Feb-19

5 5

A4400

PIPING PAINTING AND TOUCH-UP

17-Sep-18

24-Sep-18

7

0%

13

06-Feb-19

20-Feb-19

5

A4410

FIREPROOFING FOR STRUCTURAL STEEL

23-Sep-18

30-Sep-18

7

0%

17

06-Feb-19

25-Feb-19

5

17-Sep-18 17-Sep-18

10-Nov-18 19-Sep-18

47 3

0%

130 3

09-Sep-18 A 13-Mar-19

25-Mar-19 16-Mar-19

0 0

Pre-commisionin Pre-commisioning A3101 INST LOOP AND FUNCTIONAL TESTING A4660

PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING

29-Sep-18

06-Oct-18

7

17%

109

09-Sep-18 A

28-Feb-19

10

A4700

ELECTRICAL LIGHITNG TEST

29-Sep-18

01-Nov-18

30

0%

5

19-Mar-19

24-Mar-19

0

A4670

DELUGE SKID FUNCTIONAL TESTING

02-Oct-18

04-Oct-18

3

0%

5

19-Mar-19

24-Mar-19

0

A4680

LEAK TEST FOR SEPARATOR AND PIPING

04-Nov-18

06-Nov-18

3

0%

3

21-Mar-19

24-Mar-19

0

A4690

PUNCHLIST

07-Nov-18

10-Nov-18

3

0%

4

21-Mar-19

25-Mar-19

0

16-Nov-18

8 3

0%

11 0

25-Mar-19 25-Mar-19

06-Apr-19

START OF PRODUCTION

07-Nov-18 07-Nov-18

0 0

A5080

COMMISSIONING AND STARTUP

08-Nov-18

10-Nov-18

3

0%

4

26-Mar-19

30-Mar-19

0

A5090

PERFORMANCE TESTS

10-Nov-18

16-Nov-18

7

0%

6

31-Mar-19

06-Apr-19

0

10-Nov-18 10-Nov-18

28-Nov-18 12-Nov-18

16 3

03-Apr-19 03-Apr-19

26-May-19 06-Apr-19

49 49

09-Apr-19

49

Commissioning A5070

0%

46 3

DM1150

DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)

13-Nov-18

14-Nov-18

2

0%

3

07-Apr-19

DM1170

APPLY ANTI RUST TO FOUNDATION BOTLS

15-Nov-18

17-Nov-18

1

0%

2

09-Apr-19

10-Apr-19

50

DM1160

COLD CUTTING INLET AND OUTLET PIPING

17-Nov-18

20-Nov-18

3

0%

23

10-Apr-19

06-May-19

49

DM1180

UNBOLD & REMOVE EXISTING SEPARATOR

20-Nov-18

22-Nov-18

2

0%

3

06-May-19

08-May-19

49

DM1190

REMOVE CONCRETE FOUNDATION / GRADE THE AREA

22-Nov-18

28-Nov-18

5

0%

16

08-May-19

26-May-19

49

DM1200

DEMOLITION WORKS COMPLETE

0%

Demolition Works Work DM1140 WORK PERMIT APPROVED FOR DEMOLITION

28-Nov-18

0

26-May-19

49

18-Apr-18

09-Dec-18

202

214

08-Apr-18 A

01-Jul-19

18

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F440 COMPLETE FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIR

18-Apr-18 18-Apr-18 18-Apr-18 18-Apr-18

14-Jun-18 17-May-18 03-May-18 03-May-18

50 26 14 14

50%

56 56 56 56

03-Sep-18 A 03-Sep-18 A 11-Sep-18 A 11-Sep-18 A

29-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18

29 29 4 4

METERING SKID SK F450 COMPLETE SS FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/C

05-May-18 05-May-18

08-May-18 08-May-18

4 4

80%

56 56

09-Sep-18 A 09-Sep-18 A

29-Dec-18 29-Dec-18

4 4

PSV F460

09-May-18 09-May-18

13-May-18 13-May-18

4 4

40%

40 40

11-Sep-18 A 11-Sep-18 A

10-Dec-18 10-Dec-18

33 33

10-May-18 10-May-18

17-May-18 17-May-18

7 7

48 0

03-Sep-18 A 03-Sep-18 A

19-Dec-18 16-Sep-18 A

37

100%

FAHS

COMPLETE FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTU

PIPE SUPPORT F480 FABRICATION OF INSTRUMENT STANCHION SUPPORTS

0

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 36 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

F470

COMPLETE FAB. OF PIPESUPPORT STRUCTURE BY PETROSERV & TRAN

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F510 PIPING FABRICATION & FBE COATING AT KUWAIT F540

FBE PIPING BULK DELIVER AT SITE

F510-00

PIPE DELIVER AT KUWAIT

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

14-May-18 01-May-18 01-May-18 01-May-18 29-May-18

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

17-May-18

4

40%

48

12-Sep-18 A

19-Dec-18

4

14-Jun-18 14-Jun-18 27-May-18

39 39 23

0%

47 47 39

27-Sep-18 A 27-Sep-18 A 11-Oct-18 A

25-Dec-18 25-Dec-18 16-Dec-18

8 3 3

14-Jun-18

15

0%

8

17-Dec-18

25-Dec-18

3

0

100%

0

0 0

0%

41 33

06-Oct-18 A 05-Nov-18

22-Dec-18 12-Dec-18

11 11

0

0%

16

04-Dec-18

22-Dec-18

11

0

REMANING PIPING PIP (NON FBE) F510-1 COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATING F540-1

FABRICATION SPOOLS DELIVER TO SITE

F510-000

PIPE DELIVER AT FAB FACILITY

Page 24 of32

100%

0

18-Nov-18 18-Nov-18 18-Nov-18 08-May-18

176 176 176 10

08-Apr-18 A 08-Apr-18 A 08-Apr-18 A 08-Apr-18 A

16-May-19 16-May-19 16-May-19 14-Apr-18 A

0 0 0

GRADING

100%

A2030

CABLE TRENCHES AND UTILITY ROAD CROSSINGS

27-Jun-18

21-Jul-18

21

35%

40

10-Sep-18 A

10-Dec-18

0

A2020

ROADS AND PAVING(INCLUDING MODIFICATIONS)

25-Oct-18

10-Nov-18

14

0%

14

04-Apr-19

20-Apr-19

0

A2040

DRAINAGE PIPE CULVERTS

25-Oct-18

10-Nov-18

14

0%

36

11-Dec-18

21-Jan-19

0

A2050

ROAD SAFETY CRASH BARRIERS AND BOLLARD

25-Oct-18

18-Nov-18

21

0%

13

18-Apr-19

02-May-19

0

A2080

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

07-Nov-18

10-Nov-18

3

0%

13

02-May-19

16-May-19

0

A1960-1

PROTECTION OF UNDERGROUND CABLES

0

90%

4

10-Sep-18 A

10-Dec-18

0

A1965-5

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL

0

55%

40

05-Sep-18 A

10-Dec-18

0

09-May-18 09-May-18

18-Jun-18 16-May-18

35 7

100%

0 0

08-Apr-18 A 08-Apr-18 A

13-Sep-18 A 04-May-18 A

17-May-18

18-Jun-18

05-Jul-18 A

A1970

FOUNDATION WORK (STEEL FIXING)

28

100%

0

02-Jun-18 A

A1970-1

FOUNDATION WORK (CONCRETE)

0

100%

0

02-Jun-18 A

19-Jul-18 A

A1970-2

CURING / WATERPROOFING / BACK FILLING

0

100%

0

19-Jul-18 A

13-Sep-18 A

TEST SEPERAT SEPERATOR PLATFORM A1965-1 EXCAVATION FOR THE MAIN FOUNDATIONS

0 0

53 0

01-Aug-18 A 01-Aug-18 A

25-Dec-18 09-Oct-18 A

7

100%

A1970-3

FOUNDATION WORK (STEEL FIXING)

0

90%

37

22-Aug-18 A

06-Dec-18

7

A1970-4

FOUNDATION WORK (CONCRETE)

0

35%

16

03-Sep-18 A

16-Dec-18

7

A1970-5

CURING / WATERPROOFING / BACK FILLING

0

15%

16

16-Sep-18 A

25-Dec-18

7

7 7

14-Apr-18 A 09-Jul-18 A

01-Dec-18 10-Sep-18 A

29

100%

32 0

A1965-2

EXCAVATION

0

100%

0

14-Apr-18 A

21-Jul-18 A

A2010-1

FOUNDATION WORK (CONCRETE)

0

100%

0

15-Aug-18 A

24-Sep-18 A

A2010-2

CURING / WATERPROOFING / BACK FILLING

0

65%

32

11-Sep-18 A

01-Dec-18

29

21 21

30%

40 36

18-Jul-18 A 14-Sep-18 A

10-Dec-18 05-Dec-18

12 12

METERING SKID SK A2010 FOUNDATION WORK (STEEL FIXING)

PIPE SUPPORT A1990 FOUNDATION WORK (STEEL FIXING)

14-Jul-18 14-Jul-18

19-Jun-18 19-Jun-18

21-Jul-18 21-Jul-18

12-Jul-18 12-Jul-18

A1965-3

EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS

0

98%

26

18-Jul-18 A

24-Nov-18

12

A1990-1

FOUNDATION WORK (CONCRETE)

0

0%

20

30-Sep-18 A

10-Dec-18

12

A1990-2

CURING / WATER PROOFING / BACKFILL

0

0%

15

03-Oct-18 A

10-Dec-18

12

100%

43 0

21-May-18 A 21-May-18 A

13-Dec-18 08-Aug-18 A

34

EXCAVATION

0 0

A2010-4

FOUNDATION WORK (CONCRETE)

0

90%

27

08-Jul-18 A

29-Nov-18

34

A2010-3

FOUNDATION WORK (STEEL FIXING)

0

95%

19

05-Jun-18 A

15-Nov-18

34

A2010-5

CURING / WATERPROOFING / BACK FILLING

0

PSV A1965-4

90%

18

08-Sep-18 A

13-Dec-18

34

24-Sep-18 24-Sep-18 24-Sep-18

13-Oct-18 13-Oct-18 01-Oct-18

17 17 7

0%

42 17 17

16-Dec-18 30-Dec-18 30-Dec-18

02-Feb-19 17-Jan-19 17-Jan-19

4 13 7

10-Oct-18

13-Oct-18

3

0%

9

08-Jan-19

17-Jan-19

13

METERING SKID SK A2610 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W

27-Sep-18 27-Sep-18

02-Oct-18 02-Oct-18

5 5

0%

18 18

31-Dec-18 31-Dec-18

20-Jan-19 20-Jan-19

4 4

PSV A2620

01-Oct-18 01-Oct-18

06-Oct-18 06-Oct-18

5 5

0%

8 8

16-Dec-18 16-Dec-18

24-Dec-18 24-Dec-18

33 33

07-Oct-18 07-Oct-18

09-Oct-18 09-Oct-18

3 3

0%

28 28

20-Dec-18 20-Dec-18

21-Jan-19 21-Jan-19

4 4

0 0

0%

5 5

28-Jan-19 28-Jan-19

02-Feb-19 02-Feb-19

4 4

Structural Steel TEST SEPERATOR SEPERAT A2600 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2640

INSTALLATION OF LADDERS, STAIRS, HANDRAILS

INSTALLATION OF PSV VALVES ACCESS PLATFORMS

PIPE SUPPORT A2630 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS FIELD INSTRUMENT INSTRUM A2630-1 INSTALLATION OF INSTRUMENT STANCHION

A 3

M 4

2017 J Jul A 5 6 7

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

06-Oct-18 A

175 175 175 0

TEST SEPERATOR SEPERAT A1965 EXCAVATION FOR THE MAIN FOUNDATIONS

M 2

17:46

27-Sep-18 A

28-Apr-18 28-Apr-18 28-Apr-18 28-Apr-18

INSTALLATION Civil Works COMMOMN A1960

F 1

29-Nov-18

Page 37 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

Mechanical A2855

INSTALLATION OF NEW TEST SEPARATOR

Piping PIPING -REMAINING -REMA A3120 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT

U3963- Updated Revised Baseline Schedule.

Page 25 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

06-Sep-18 06-Sep-18

23-Sep-18 23-Sep-18

15 15

100%

0 0

06-Oct-18 A 06-Oct-18 A

08-Oct-18 A 08-Oct-18 A

15-Sep-18 15-Sep-18 15-Sep-18

25-Oct-18 11-Oct-18 01-Oct-18

36 24 15

0%

104 45 37

23-Dec-18 23-Dec-18 23-Dec-18

22-Apr-19 12-Feb-19 03-Feb-19

11 70 3

A3130

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

24-Sep-18

30-Sep-18

6

0%

5

29-Jan-19

03-Feb-19

4

A3140

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

01-Oct-18

03-Oct-18

3

0%

13

29-Jan-19

12-Feb-19

4

A3150

TIE-IN

04-Oct-18

11-Oct-18

7

0%

5

29-Jan-19

03-Feb-19

4

A3120-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

9

15-Jan-19

24-Jan-19

4

A3151-1

REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV

0

0%

3

31-Jan-19

03-Feb-19

78

MOBILIZATION OF HOT TAPPING SUB CONTRACTOR

06-Oct-18 06-Oct-18

25-Oct-18 08-Oct-18

18 3

0%

46 3

28-Feb-19 28-Feb-19

22-Apr-19 03-Mar-19

4 4

HT1130

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

09-Oct-18

20-Oct-18

10

0%

9

03-Mar-19

12-Mar-19

4

HT1140

FLARE TIE-IN / NDT

21-Oct-18

23-Oct-18

3

0%

13

13-Mar-19

27-Mar-19

4

HT1150

HOT TIE-IN COMPLETE / REMOVE SCAFFOLD

24-Oct-18

25-Oct-18

2

HOT TAPPING HT1120

Pre Shutdown and Plant Shutdown Tie-in A3150-000 MOBILIZATION OF OF TEAM APPLY PTW

0%

12

09-Apr-19

22-Apr-19

4

0 0

0%

21 1

30-Mar-19 30-Mar-19

22-Apr-19 30-Mar-19

4 4

A3150-00

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

0

0%

8

31-Mar-19

08-Apr-19

4

A3150-1

PIPING TIE-IN / NDT PRE SHUT DOWN

0

0%

15

30-Mar-19

15-Apr-19

4

A3150-2

PIPING TIE-IN / NDT SHUT DOWN

0

0%

7

15-Apr-19

22-Apr-19

4

158 14

0%

81 12

10-Sep-18 A 30-Dec-18

27-Jan-19 12-Jan-19

4 5

CABLE GLAND AND TERMINATION

09-May-18 09-May-18

08-Nov-18 24-May-18

A3640

U/G CABLE LAYING

26-May-18

02-Jun-18

7

0%

7

03-Jan-19

10-Jan-19

4

A3650

CABLE TRAY INSTALLATION

24-Sep-18

09-Oct-18

14

0%

17

20-Dec-18

08-Jan-19

3

A3660

ELECTRICAL EQUIPMENTS INSTALLATION

10-Oct-18

17-Oct-18

7

0%

12

30-Dec-18

12-Jan-19

3

A3670

CABLE LAYING

18-Oct-18

25-Oct-18

7

0%

15

23-Dec-18

08-Jan-19

3

A3680

LIGHTING FIXTURE AND DB INSTALLATION

18-Oct-18

25-Oct-18

7

0%

7

05-Jan-19

12-Jan-19

3

A3690

ELECTRICAL TIE-INS

27-Oct-18

03-Nov-18

7

0%

2

16-Jan-19

17-Jan-19

3

A3700

ENERGIZATION

04-Nov-18

08-Nov-18

5

0%

4

17-Jan-19

21-Jan-19

3

A3640-1

BACK FILLING OF CABLE TRENCH

0

0%

15

10-Jan-19

27-Jan-19

4

A3670-1

HOOK UP

0

0%

5

12-Jan-19

16-Jan-19

3

A3920

EARTH PIT DRILLING

0

0%

4

20-Dec-18

24-Dec-18

5

A6520

CABLE TRENCHES

0

35%

40

10-Sep-18 A

10-Dec-18

4

40 14

0%

57 15

05-Jan-19 05-Jan-19

11-Mar-19 21-Jan-19

4 4

Electrical A3630

Instrument & Control Co A4150 CABLE TRAY AND SUPPORT INSTALLATION

08-Sep-18 08-Sep-18

23-Oct-18 23-Sep-18

A4160

INSTRUMENT EQUIPMENT CALIBRATION/ LOOP TEST

24-Sep-18

01-Oct-18

7

0%

6

05-Mar-19

11-Mar-19

4

A4190

DCS MODIFICATION IN CONTROL ROOM BY VENDOR

24-Sep-18

07-Oct-18

12

0%

6

24-Feb-19

02-Mar-19

4

A4170

INSTRUMENT EQUIPEMNT INSTALLATION (RO, CONTROL VALVE, PRV, SDV

02-Oct-18

09-Oct-18

7

0%

17

02-Feb-19

20-Feb-19

4

A4180

INSTRUMENT CABLE LAYING

10-Oct-18

15-Oct-18

5

0%

17

17-Jan-19

05-Feb-19

5

A5320

INSTALLATION OF DELUGE

16-Oct-18

23-Oct-18

7

0%

5

16-Feb-19

20-Feb-19

7

A4180-1

SS TUBE AND LEAK TEST

0

0%

4

02-Mar-19

05-Mar-19

7

A4170-1

INSTALLATION OF INSTRUMENT VALVE

0

0%

6

14-Feb-19

20-Feb-19

4

A4170-2

FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)

0

0%

17

02-Feb-19

20-Feb-19

4

A4170-3

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

3

18-Feb-19

20-Feb-19

5

A3710

JB SUPPORT INSTALLATION

0

0%

4

17-Jan-19

21-Jan-19

4

A3810

JB INSTALLATION

0

0%

4

22-Jan-19

26-Jan-19

4

A3900

CABLE GLANDING AND TERMINATION (ALONG JBs)

0

0%

5

27-Jan-19

31-Jan-19

5

A3910

CABLE GLANDING AND TERMINATION (ALONG INSTRUMENTS)

0

0%

5

20-Feb-19

25-Feb-19

4

F&G SUPPORT INSTALLATION

0 0

0%

41 4

17-Jan-19 17-Jan-19

05-Mar-19 21-Jan-19

44 78

A6300

F&G DEVICES INSTALLATION

0

0%

4

21-Jan-19

24-Jan-19

78

A6280

F&G CABLE INSTALLATION

0

0%

9

17-Jan-19

27-Jan-19

76

A6310

F&G JB SUPPORT INSTALLATION

0

0%

2

22-Jan-19

23-Jan-19

79

A6320

F&G JB INSTALLATION

0

0%

2

27-Jan-19

28-Jan-19

75

A6330

F&G CABLE GLANDING AND TERMINATION

0

0%

5

20-Feb-19

25-Feb-19

46

A6340

F&G LOOP PREPARATION

0

0%

3

25-Feb-19

27-Feb-19

46

A6350

F&G LOOP TESTING

0

0%

3

03-Mar-19

05-Mar-19

44

F&G System A6290

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 38 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

Painting & Fireproofing Firep A4420 STRUCTURAL STEEL PAINTING AND TOUCH-UP

U3963- Updated Revised Baseline Schedule.

Page 26 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

02-Oct-18 02-Oct-18

17-Oct-18 09-Oct-18

14 7

0%

30 12

27-Jan-19 27-Jan-19

02-Mar-19 09-Feb-19

5 5

A4430

PIPING PAINTING AND TOUCH-UP

04-Oct-18

11-Oct-18

7

0%

13

29-Jan-19

12-Feb-19

10

A4440

FIREPROOFING FOR STRUCTURAL STEEL

10-Oct-18

17-Oct-18

7

0%

25

02-Feb-19

02-Mar-19

5

04-Oct-18 04-Oct-18

13-Nov-18 07-Oct-18

35 3

0%

168 3

09-Sep-18 A 23-Apr-19

08-May-19 25-Apr-19

3 3

21-Mar-19

18

Pre-commisionin Pre-commisioning A3151 INST LOOP AND FUNCTIONAL TESTING A4710

PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING

13-Oct-18

20-Oct-18

7

17%

127

09-Sep-18 A

A4750

ELECTRICAL LIGHTING TEST

13-Oct-18

10-Nov-18

25

0%

5

25-Apr-19

30-Apr-19

3

A4720

DELUGE SKID FUNCTIONAL TESTING

16-Oct-18

18-Oct-18

3

0%

5

30-Apr-19

05-May-19

3

A4730

PUNCHLIST

11-Nov-18

13-Nov-18

3

0%

4

05-May-19

08-May-19

3

A4720-1

LEAK TEST FOR SEPARATOR AND PIPING

0

0%

3

02-May-19

05-May-19

3

START OF PRODUCTION

17-Nov-18 17-Nov-18

26-Nov-18 20-Nov-18

8 3

0%

10 1

09-May-19 09-May-19

20-May-19 09-May-19

0 3

A5140

COMMISSIONING AND STARTUP

18-Nov-18

21-Nov-18

3

0%

4

09-May-19

13-May-19

3

A5150

PERFORMANCE TESTS

21-Nov-18

26-Nov-18

7

0%

3

18-May-19

20-May-19

0

20-Nov-18 20-Nov-18

09-Dec-18 24-Nov-18

16 3

18-May-19 18-May-19

01-Jul-19 20-May-19

18 18

Commissioning A5130

0%

39 3

DM1220

DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)

24-Nov-18

26-Nov-18

2

0%

2

21-May-19

22-May-19

18

DM1240

APPLY ANTI RUST TO FOUNDATION BOTLS

26-Nov-18

27-Nov-18

1

0%

1

22-May-19

23-May-19

18

DM1230

COLD CUTTING INLET AND OUTLET PIPING

27-Nov-18

01-Dec-18

3

0%

21

23-May-19

16-Jun-19

18

DM1250

UNBOLD & REMOVE EXISTING SEPARATOR

01-Dec-18

03-Dec-18

2

0%

2

16-Jun-19

18-Jun-19

18

DM1260

REMOVE CONCRETE FOUNDATION / GRADE THE AREA

03-Dec-18

09-Dec-18

5

0%

12

18-Jun-19

01-Jul-19

18

DM1270

DEMOLITION WORKS COMPLETE

09-Dec-18

0

0%

0

01-Jul-19

18

Demolition Works Work DM1210 WORK PERMIT APPROVED FOR DEMOLITION

19-May-18

16-Dec-18

182

209

05-May-18 A

25-Jun-19

23

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F550 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR

19-May-18 19-May-18 19-May-18 19-May-18

08-Jul-18 21-Jun-18 05-Jun-18 05-Jun-18

44 30 16 16

45%

62 60 60 60

03-Sep-18 A 03-Sep-18 A 10-Sep-18 A 10-Sep-18 A

05-Jan-19 02-Jan-19 02-Jan-19 02-Jan-19

88 90 0 0

METERING SKID SK F560 FAB OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER

06-Jun-18 06-Jun-18

11-Jun-18 11-Jun-18

5 5

80%

60 60

12-Sep-18 A 12-Sep-18 A

02-Jan-19 02-Jan-19

2 2

PSV F570

12-Jun-18 12-Jun-18

17-Jun-18 17-Jun-18

5 5

50%

48 48

11-Sep-18 A 11-Sep-18 A

19-Dec-18 19-Dec-18

25 25

14-Jun-18 14-Jun-18

21-Jun-18 21-Jun-18

7 7

60 0

03-Sep-18 A 03-Sep-18 A

02-Jan-19 11-Oct-18 A

90

100%

FAHN

FAB OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFE

PIPE SUPPORT F590 FABRICATION OF INSTRUMENT STANCHION SUPPORTS F580

FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATI

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F620 PIPING FABRICATION & FBE COATING AT KUWAIT F650

FBE PIPING BULK DELIVER AT SITE

F620-000

PIPE DELIVER AT KUWAIT

18-Jun-18

21-Jun-18

4

45%

60

11-Sep-18 A

02-Jan-19

0

28-May-18 28-May-18 28-May-18

08-Jul-18 08-Jul-18 18-Jun-18

36 36 19

0%

48 48 39

27-Sep-18 A 27-Sep-18 A 14-Oct-18 A

05-Jan-19 05-Jan-19 25-Dec-18

34 34 34

25-Jun-18

08-Jul-18

12

0%

9

26-Dec-18

05-Jan-19

34

0

100%

0

0%

40 33

06-Oct-18 A 19-Nov-18 16-Dec-18

0 0

REMAINING PIPING PI (NON FBE) F620-1 COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATIN

03-Jan-19 26-Dec-18

20 20

03-Jan-19

20

FABRICATION SPOOLS DELIVER TO SITE

0

0%

17

F620-00

PIPE DELIVER AT PETROSERV FACILITY BY CPECC - DRV

0

100%

0 05-May-18 A 05-May-18 A 05-May-18 A 05-May-18 A

05-May-19 05-May-19 05-May-19 10-May-18 A

4 4 4

16-Apr-19

05-May-19

4

GRADING

100%

165 165 165 0

A2160

UTILITY ROAD CROSSINGS

22-Nov-18

16-Dec-18

21

0%

17

A2150

ROADS AND PAVING(INCLUDING MODIFICATIONS)

22-Nov-18

08-Dec-18

14

0%

14

13-Apr-19

28-Apr-19

4

A2170

DRAINAGE PIPE CULVERTS

22-Nov-18

08-Dec-18

14

0%

11

25-Dec-18

06-Jan-19

4

A2180

ROAD SAFETY CRASH BARRIERS AND BOLLARD

22-Nov-18

16-Dec-18

21

0%

13

21-Apr-19

05-May-19

4

A2200

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

05-Dec-18

08-Dec-18

3

0%

14

13-Apr-19

28-Apr-19

4

A2090-1

PROTECTION OF UNDERGROUND CABLES

0

80%

52

13-Aug-18 A

24-Dec-18

9

A2095-00

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL

0

50%

12

18-Sep-18 A

07-Nov-18

4

A2160-1

CABLE TRENCHES

0

0%

40

08-Nov-18

24-Dec-18

4

100%

0 0

05-May-18 A 05-May-18 A

09-Sep-18 A 04-Aug-18 A

25-Jun-18 25-Jun-18

155 155 155 5

04-Aug-18 02-Jul-18

35 7

A 3

M 4

2017 J Jul A 5 6 7

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

06-Oct-18 A

19-Jun-18 19-Jun-18 19-Jun-18 19-Jun-18

TEST SEPERATOR SEPERAT A2095 EXCAVATION FOR THE MAIN FOUNDATIONS

16-Dec-18 16-Dec-18 16-Dec-18 24-Jun-18

M 2

17:46

27-Sep-18 A

F650-1 INSTALLATION Civil Works COMMOMN A2090

F 1

29-Nov-18

Page 39 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

03-Jul-18

04-Aug-18

Page 27 of32

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

A2100

FOUNDATION WORK (STEEL FIXING)

28

100%

0

03-Jul-18 A

16-Aug-18 A

A2100-3

CURING / WATERPROOFING / BACK FILLING

0

100%

0

05-Aug-18 A

09-Sep-18 A

A2100-1

FOUNDATION WORK (CONCRETE)

0

100%

0

17-Jul-18 A

23-Aug-18 A

0 0

40%

58 28

28-Aug-18 A 28-Aug-18 A

31-Dec-18 26-Nov-18

8 8

TEST SEPERAT SEPERATOR PLATFORM A2095-1 EXCAVATION FOR THE MAIN FOUNDATIONS A2100-5

FOUNDATION WORK (CONCRETE)

0

0%

18

22-Nov-18

12-Dec-18

8

A2100-4

FOUNDATION WORK (STEEL FIXING)

0

0%

15

10-Oct-18 A

03-Dec-18

16

A2140-125

CURING / WATER PROOFING / BACKFILL

0

0%

25

03-Dec-18

31-Dec-18

8

7 7

05-May-18 A 04-Jul-18 A

26-Nov-18 05-Sep-18 A

39 39

100%

28 0

A2140-2

CURING / WATERPROOFING / BACK FILLING

0

0%

28

08-Oct-18 A

26-Nov-18

A2095-2

EXCAVATION

0

100%

0

05-May-18 A

07-Aug-18 A

A2140-1

FOUNDATION WORK (CONCRETE)

0

95%

3

28-Aug-18 A

28-Oct-18

39

21 21

80%

60 31

04-Aug-18 A 08-Sep-18 A

02-Jan-19 29-Nov-18

2 12

METERING SKID SK A2140 FOUNDATION WORK (STEEL FIXING)

PIPE SUPPORT A2120 FOUNDATION WORK (STEEL FIXING)

29-Aug-18 29-Aug-18

05-Aug-18 05-Aug-18

05-Sep-18 05-Sep-18

28-Aug-18 28-Aug-18

A2120-2

CURING / WATERPROOFING / BACK FILLING

0

20%

45

16-Sep-18 A

02-Jan-19

2

A2095-3

EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS

0

90%

19

04-Aug-18 A

15-Nov-18

17

A2120-1

FOUNDATION WORK (CONCRETE)

0

80%

48

11-Sep-18 A

19-Dec-18

2

50%

56 44

26-May-18 A 18-Sep-18 A

29-Dec-18 15-Dec-18

34 34

CURING / WATERPROOFING / BACK FILLING

0 0

A2095-4

EXCAVATION

0

100%

0

26-May-18 A

22-Oct-18 A

A2140-3

FOUNDATION WORK (STEEL FIXING)

0

80%

19

09-Jul-18 A

15-Nov-18

34

A2140-4

FOUNDATION WORK (CONCRETE)

0

70%

56

10-Sep-18 A

29-Dec-18

34

17 7 7

0%

35 18 18

26-Dec-18 06-Jan-19 06-Jan-19

04-Feb-19 26-Jan-19 26-Jan-19

67 4 4

0

PSV A2140-5

11-Oct-18 11-Oct-18 11-Oct-18

30-Oct-18 18-Oct-18 18-Oct-18

0%

9

16-Jan-19

26-Jan-19

4

METERING SKID SK A2670 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W

15-Oct-18 15-Oct-18

20-Oct-18 20-Oct-18

5 5

0%

11 11

09-Jan-19 09-Jan-19

21-Jan-19 21-Jan-19

2 2

PSV A2680

18-Oct-18 18-Oct-18

23-Oct-18 23-Oct-18

5 5

0%

9 9

26-Dec-18 26-Dec-18

05-Jan-19 05-Jan-19

25 25

PIPE SUPPORT A2690 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS

24-Oct-18 24-Oct-18

27-Oct-18 27-Oct-18

3 3

0%

18 18

10-Jan-19 10-Jan-19

30-Jan-19 30-Jan-19

0 0

FIELD INSTRUMENT INSTRUM A2700 INSTALLATION OF INSTRUMENT STANCHION

28-Oct-18 28-Oct-18

30-Oct-18 30-Oct-18

3 3

0%

5 5

30-Jan-19 30-Jan-19

04-Feb-19 04-Feb-19

67 67

24-Sep-18 24-Sep-18

10-Oct-18 10-Oct-18

15 15

100%

0 0

05-Sep-18 A 05-Sep-18 A

12-Sep-18 A 12-Sep-18 A

03-Oct-18 03-Oct-18 03-Oct-18

29-Oct-18 29-Oct-18 18-Oct-18

23 23 14

0%

79 77 21

21-Jan-19 21-Jan-19 21-Jan-19

22-Apr-19 20-Apr-19 13-Feb-19

4 6 0

Structural Steel TEST SEPERATOR SEPERAT A2660 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2660-1

Mechanical A2875

INSTALLATION OF LADDERS, STAIRS, HANDRAILS

INSTALLATION OF PSV VALVES ACCESS PLATFORMS

INSTALLATION OF NEW TEST SEPARATOR

Piping PIPING -REMAINING -REMA A3170 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT A3180

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

11-Oct-18

17-Oct-18

6

0%

5

15-Apr-19

20-Apr-19

0

A3190

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

18-Oct-18

21-Oct-18

3

0%

13

02-Feb-19

16-Feb-19

4

A3200

TIE-IN

22-Oct-18

29-Oct-18

7

0%

5

15-Apr-19

20-Apr-19

0

A3170-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

12

29-Jan-19

11-Feb-19

56

A3151-11

REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV

0

Pre Shutdown and Plant Shutdown Tie-in A3200-2 PIPING TIE-IN / NDT SHUT DOWN

0%

3

17-Apr-19

20-Apr-19

6

0 0

0%

26 7

24-Mar-19 15-Apr-19

22-Apr-19 22-Apr-19

4 4

A3200-b

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

0

0%

7

24-Mar-19

31-Mar-19

0

A3200-1

PIPING TIE-IN / NDT PRE SHUT DOWN

0

0%

14

31-Mar-19

15-Apr-19

0

A3200-a

MOBILIZATION OF OF TEAM APPLY PTW

0

0%

1

24-Mar-19

24-Mar-19

0

140 14

0%

108 12

08-Nov-18 16-Feb-19

13-Mar-19 28-Feb-19

4 5

Electrical A3720

CABLE GLAND AND TERMINATION

25-Jun-18 25-Jun-18

04-Dec-18 10-Jul-18

A3730

U/G CABLE LAYING

11-Jul-18

18-Jul-18

7

0%

8

30-Dec-18

07-Jan-19

5

A3740

CABLE TRAY INSTALLATION

20-Oct-18

04-Nov-18

14

0%

9

26-Jan-19

04-Feb-19

4

A3750

ELECTRICAL EQUIPMENTS INSTALLATION

05-Nov-18

12-Nov-18

7

0%

12

02-Feb-19

14-Feb-19

4

A3760

CABLE LAYING

13-Nov-18

20-Nov-18

7

0%

17

30-Jan-19

18-Feb-19

4

A3770

LIGHTING FIXTURE AND DB INSTALLATION

13-Nov-18

20-Nov-18

7

0%

9

21-Feb-19

03-Mar-19

4

A3780

ELECTRICAL TIE-INS

21-Nov-18

28-Nov-18

7

0%

2

07-Mar-19

09-Mar-19

4

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 40 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

29-Nov-18

04-Dec-18

Page 28 of32

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

A3790

ENERGIZATION

5

0%

4

10-Mar-19

13-Mar-19

4

A3730-1

BACK FILLING OF CABLE TRENCH

0

0%

12

06-Jan-19

19-Jan-19

5

A3760-1

HOOK UP

0

0%

5

03-Mar-19

07-Mar-19

4

A2160-11

CABLE TRENCHES

0

0%

40

08-Nov-18

24-Dec-18

5

A3930

EARTH PIT DRILLING

0

Instrument & Control Co A4240 DCS MODIFICATION IN CONTROL ROOM BY VENDOR

0%

5

31-Dec-18

05-Jan-19

5

11-Oct-18 11-Oct-18

08-Dec-18 17-Oct-18

50 6

0%

40 9

16-Jan-19 12-Feb-19

03-Mar-19 21-Feb-19

2 4

A4930

JB INSTALLATION

16-Oct-18

19-Oct-18

3

0%

3

30-Jan-19

02-Feb-19

4

A4940

JB SUPPORT INSTALLATION

16-Oct-18

19-Oct-18

3

0%

4

27-Jan-19

30-Jan-19

4

A4200

CABLE TRAY AND SUPPORTS INSTALLATION

23-Oct-18

07-Nov-18

14

0%

13

16-Jan-19

30-Jan-19

2

A4990

CABLE GLAND AND TERMINATION (ALONG INSTRUMENTS)

30-Oct-18

01-Nov-18

3

0%

7

16-Feb-19

23-Feb-19

2

A4210

INSTRUMENT EQUIPMENT CALIBRATION

08-Nov-18

15-Nov-18

7

0%

6

25-Feb-19

03-Mar-19

2

A4220

INSTRUMENT EQUIPEMNT INSTALLATION (RO, CONTROL VALVE, PRV, SDV

17-Nov-18

24-Nov-18

7

0%

18

23-Jan-19

12-Feb-19

2

A4230

INSTRUMENT CABLE LAYING

25-Nov-18

29-Nov-18

5

0%

16

22-Jan-19

09-Feb-19

2

A5330

INSTALLATION OF DELUGE

01-Dec-18

08-Dec-18

7

0%

7

05-Feb-19

12-Feb-19

4

A4230-1

SS TUBE AND LEAK TEST

0

0%

4

23-Feb-19

26-Feb-19

2

A4220-1

INSTALLATION OF INSTRUMENT VALVE

0

0%

3

10-Feb-19

12-Feb-19

15

A4220-2

FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)

0

0%

23

23-Jan-19

18-Feb-19

2

A4220-3

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

3

10-Feb-19

12-Feb-19

4

A3800

FIELD INSTRUMENT INSTALLATION

0

0%

17

09-Feb-19

27-Feb-19

4

A4980

CABLE GLAND AND TERMINATION (ALONG JBs)

0

0%

10

10-Feb-19

20-Feb-19

4

22-Jan-19 27-Jan-19

27-Feb-19 30-Jan-19

40 62

F&G SUPPORT INSTALLATION

0 0

0%

32 4

A6380

F&G DEVICES INSTALLATION

0

0%

4

29-Jan-19

02-Feb-19

62

A6360

F&G CABLE INSTALLATION

0

0%

8

22-Jan-19

30-Jan-19

64

A6390

F&G JB SUPPORT INSTALLATION

0

0%

2

30-Jan-19

31-Jan-19

63

A6400

F&G JB INSTALLATION

0

0%

3

02-Feb-19

04-Feb-19

60

A6410

F&G CABLE GLANDING AND TERMINATION

0

0%

5

18-Feb-19

23-Feb-19

18

A6420

F&G LOOP PREPARATION

0

0%

2

23-Feb-19

24-Feb-19

18

A6430

F&G LOOP TESTING

0

0%

4

24-Feb-19

27-Feb-19

18

04-Feb-19 04-Feb-19

04-Mar-19 18-Feb-19

4 4

04-Feb-19

18-Feb-19

4

F&G System A6370

Painting & Fireproofing Firep A4450 STRUCTURAL STEEL PAINTING AND TOUCH-UP

20-Oct-18 20-Oct-18

04-Nov-18 27-Oct-18

14 7

0%

25 13

7

0%

13

A4460

PIPING PAINTING AND TOUCH-UP

22-Oct-18

29-Oct-18

A4470

FIREPROOFING FOR STRUCTURAL STEEL

28-Oct-18

04-Nov-18

7

0%

20

10-Feb-19

04-Mar-19

4

22-Oct-18 22-Oct-18

15-Dec-18 24-Oct-18

47 3

0%

162 3

09-Sep-18 A 16-Apr-19

01-May-19 18-Apr-19

1 0

Pre-commisionin Pre-commisioning A3201 INST LOOP AND FUNCTIONAL TESTING A4760

PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING

30-Oct-18

06-Nov-18

7

17%

127

09-Sep-18 A

21-Mar-19

18

A4800

ELECTRICAL LIGHITNG TESTING

30-Oct-18

26-Nov-18

24

0%

5

20-Apr-19

24-Apr-19

0

A4770

DELUGE SKID FUNCTIONAL TESTING

09-Dec-18

11-Dec-18

3

0%

3

24-Apr-19

27-Apr-19

0

A4780

PUNCH LIST

12-Dec-18

15-Dec-18

3

0%

4

28-Apr-19

01-May-19

0

A4770-1

LEAK TEST FOR SEPARATOR AND PIPING

0

0%

5

23-Apr-19

28-Apr-19

4

01-May-19 01-May-19

09-May-19 02-May-19

0 0

START OF PRODUCTION

28-Nov-18 28-Nov-18

07-Dec-18 30-Nov-18

8 3

0%

8 2

A5200

COMMISSIONING AND STARTUP

29-Nov-18

01-Dec-18

3

0%

3

02-May-19

05-May-19

0

A5210

PERFORMANCE TESTS

01-Dec-18

07-Dec-18

7

0%

4

06-May-19

09-May-19

0

27-Nov-18 27-Nov-18

16-Dec-18 29-Nov-18

16 3

0%

43 3

07-May-19 07-May-19

25-Jun-19 09-May-19

23 23

Commissioning A5190

Demolition Works Work DM1280 WORK PERMIT APPROVED FOR DEMOLITION DM1290

DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)

01-Dec-18

02-Dec-18

2

0%

2

11-May-19

12-May-19

23

DM1310

APPLY ANTI RUST TO FOUNDATION BOTLS

03-Dec-18

04-Dec-18

1

0%

2

12-May-19

13-May-19

23

DM1300

COLD CUTTING INLET AND OUTLET PIPING

04-Dec-18

08-Dec-18

3

0%

21

13-May-19

05-Jun-19

23

DM1320

UNBOLD & REMOVE EXISTING SEPARATOR

08-Dec-18

10-Dec-18

2

0%

2

05-Jun-19

06-Jun-19

23

DM1330

REMOVE CONCRETE FOUNDATION / GRADE THE AREA

10-Dec-18

16-Dec-18

5

0%

16

08-Jun-19

25-Jun-19

23

DM1340

DEMOLITION WORKS COMPLETE

16-Dec-18

0

0%

0

25-Jun-19

23

09-May-18

24-Dec-18

197

183

24-Jun-18 A

26-May-19

10

19-Jun-18 23-Jun-18 23-Jun-18

01-Aug-18 17-Jul-18 05-Jul-18

38 22 12

79 79 79

03-Sep-18 A 03-Sep-18 A 13-Sep-18 A

24-Jan-19 24-Jan-19 24-Jan-19

64 64 9

FAHM FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 41 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

F660

U3963- Updated Revised Baseline Schedule.

Page 29 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR

23-Jun-18

05-Jul-18

12

30%

79

13-Sep-18 A

24-Jan-19

9

METERING SKID SK F670 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER

07-Jul-18 07-Jul-18

09-Jul-18 09-Jul-18

3 3

30%

79 79

13-Sep-18 A 13-Sep-18 A

24-Jan-19 24-Jan-19

9 9

PSV F680

10-Jul-18 10-Jul-18

12-Jul-18 12-Jul-18

3 3

30%

66 66

13-Sep-18 A 13-Sep-18 A

09-Jan-19 09-Jan-19

77 77

10-Jul-18 10-Jul-18

17-Jul-18 17-Jul-18

7 7

62 0

03-Sep-18 A 03-Sep-18 A

05-Jan-19 16-Sep-18 A

58

100%

FAB.OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFE

PIPE SUPPORT F700 FABRICATION OF INSTRUMENT STANCHION SUPPORTS F690

FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATI

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F730 PIPING FABRICATION & FBE COATING AT KUWAIT F760

FBE PIPING BULK DELIVER AT SITE

F730-000

PIPE DELIVER AT KUWAIT

REMAINING PIPING PI (NON FBE) F730-1 COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATIN

14-Jul-18

17-Jul-18

4

67%

62

12-Sep-18 A

05-Jan-19

51

19-Jun-18 19-Jun-18 19-Jun-18

01-Aug-18 01-Aug-18 11-Jul-18

38 38 20

0%

72 67 58

27-Sep-18 A 27-Sep-18 A 18-Oct-18 A

16-Jan-19 10-Jan-19 31-Dec-18

28 22 22

17-Jul-18

01-Aug-18

14

0%

9

01-Jan-19

10-Jan-19

22

0

100%

0

0%

42 40

06-Oct-18 A 29-Nov-18 29-Dec-18

0 0

16-Jan-19 14-Jan-19

28 28

16-Jan-19

28

FABRICATION SPOOLS DELIVER TO SITE

0

0%

17

F730-00

PIPE DELIVER AT FACILITY BY CPECC

0

100%

0

0 0

43 0

24-Jun-18 A 24-Jun-18 A

20-Dec-18

100%

METHOD STATEMENT RE SUBMISSION & APPROVED BY QP

0

100%

0

24-Jun-18 A

19-Sep-18 A

OPERATION CLEARANCE & VESSEL DEPRESSURIZATION BY QP OPERATIO

0

0%

5

01-Nov-18

06-Nov-18

3

FM-DEM-1030

PURGING / SYSTEM ISOLATE SEPERATOR FROM EXISTING SYSTEM

0

0%

7

07-Nov-18

14-Nov-18

32

FM-DEM-1040

COMPLETE DEMO WORK OF SEPARATOR & METERING SKID FOUNDATIO

0

0%

30

15-Nov-18

19-Dec-18

37

0 0 0

0%

7 5 5

07-Nov-18 07-Nov-18 07-Nov-18

14-Nov-18 12-Nov-18 12-Nov-18

3 3 3

INSTRUMENT ISOLATION I A5640 ISOLATION OF ASSOCIATED INTRUMENTS

0 0

0%

2 2

11-Nov-18 11-Nov-18

12-Nov-18 12-Nov-18

4 4

ELECTRICAL ISOLATION IS A5650 ISOLATION OF ASSOCIATED ELECTRICAL ITEMS

0 0

0%

2 2

13-Nov-18 13-Nov-18

14-Nov-18 14-Nov-18

3 3

DEMOLITION WORKS W DEMOLITION O OF EXISTING PIPING A5660 REMOVAL OF EXISITNG PIPING WITH SEPARATOR

0 0 0

0%

32 7 7

14-Nov-18 14-Nov-18 14-Nov-18

20-Dec-18 21-Nov-18 21-Nov-18

37 3 3

0 0

0%

6 3

19-Nov-18 19-Nov-18

25-Nov-18 21-Nov-18

7 3

0

A5680

REMOVAL OF SEPARTOR FROM EXISTING LOGIC

DISMANTLING OF EXISTING SEPARATOR A5690 APPLICATION OF ANTI-RUST PAINT/COATING

0%

5

20-Nov-18

25-Nov-18

7

0 0

0%

4 2

25-Nov-18 25-Nov-18

28-Nov-18 26-Nov-18

4 3

A5700

UNBOLTING OF SEPARATOR FROM FOUNDATION

0

0%

2

25-Nov-18

26-Nov-18

4

A5710

LIFITNG AND REMOVAL FROM FOUNDATION

0

DISMANTLING OF EXISTING SEPARATOR PLATFORM A5750 APPLICATION OF ANTI-RUST PAINT/COATING

0%

2

27-Nov-18

28-Nov-18

4

0 0

0%

5 1

26-Nov-18 26-Nov-18

01-Dec-18 26-Nov-18

3 3

A5760

UNBOLTING OF PLATFORM FROM FOUNDATION

0

0%

2

26-Nov-18

27-Nov-18

3

A5770

LIFTING AND REMOVAL FROM FOUNDATION

0

0%

4

27-Nov-18

01-Dec-18

3

0 0

0%

5 1

27-Nov-18 27-Nov-18

02-Dec-18 27-Nov-18

16 16

DISMANTLING OF EXISTING METERING SKID A5720 APPLICATION OF ANTI-RUST PAINT/COATING A5730

UNBOLTING FROM FOUNDATION

0

0%

2

27-Nov-18

28-Nov-18

16

A5740

LIFTING AND REMOVAL FROM FOUNDATION

0

0%

2

01-Dec-18

02-Dec-18

16

0 0

0%

8 2

27-Nov-18 27-Nov-18

05-Dec-18 28-Nov-18

16 17

DISMANTLING OF EXISTING METERING SKID PLATFORM A5780 APPLICATION OF ANTI-RUST PAINT/COATING A5790

UNBOLTING OF PLATFORM FROM FOUNDATION

0

0%

3

27-Nov-18

29-Nov-18

17

A5800

LIFTING AND REMOVAL FROM FOUNDATION

0

0%

4

02-Dec-18

05-Dec-18

16

0 0

0%

8 2

27-Nov-18 27-Nov-18

05-Dec-18 28-Nov-18

43 46

DISMANTLING OF EXISTING PSV PLATFORM A5810 APPLICATION OF ANTI-RUST PAINT/COATING A5820

UNBOLTING OF PLATFORM FROM FOUNDATION

0

0%

3

27-Nov-18

29-Nov-18

46

A5830

LIFTING AND REMOVAL FROM FOUNDATION

0

0%

2

04-Dec-18

05-Dec-18

43

0%

17 17

02-Dec-18 02-Dec-18

20-Dec-18 20-Dec-18

3 3

DEMOLITION OF O EXISITNG SEPARATOR FOUNDATION A5840 EXISTING SEPARATOR FOUNDATION DEMOLITION

0 0

M 4

2017 J Jul A 5 6 7

S 8

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

37

FM-DEM-1020

DEMOLITION O OF EXISTING INSTRUMENTATION A5670 REMOVAL OF EXISITNG INTRUMENTS AND CABLES WITH SEPARATOR

A 3

06-Oct-18 A

FM-DEM-1010

ISOLATION WORKS WOR PIPING ISOLATION ISOLAT A5630 ISOLATION OF EXISTING VALVES

M 2

17:46

27-Sep-18 A

F760-1

ISOLATION AND DEMOLITION WORKS FM-DEM-1000 ISSUE METHOD STATEMENT FOR ISOLATION & DEMOLTION WORK OF SE

F 1

29-Nov-18

Page 42 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

DEMOLITION OF O EXISTING METERING SKID FOUNDATION A5850 EXISTING FOUNDATION DEMOLITION

0 0

0%

8 8

06-Dec-18 06-Dec-18

15-Dec-18 15-Dec-18

16 16

DEMOLITION O OF EXISTING PSV FOUNDATION A5860 EXISTING FOUNDATION DEMOLITION

0 0

0%

7 7

06-Dec-18 06-Dec-18

13-Dec-18 13-Dec-18

43 43

04-Aug-18 A 04-Aug-18 A 14-Sep-18 A 14-Sep-18 A

26-May-19 26-May-19 26-May-19 15-Nov-18

10 10 10 10

INSTALLATION Civil Works COMMOMN A2230

GRADING

BL1 Start

BL1 Finish

Page 30 of32

09-May-18 09-May-18 09-May-18 09-May-18

24-Dec-18 24-Dec-18 24-Dec-18 20-May-18

197 197 197 10

0%

183 183 169 5

A2300

CABLE TRENCHES AND UTILITY ROAD CROSSINGS

09-Jul-18

01-Aug-18

21

0%

25

04-Dec-18

01-Jan-19

29

A2290

ROADS AND PAVING(INCLUDING MODIFICATIONS)

22-Nov-18

08-Dec-18

14

0%

16

18-Apr-19

07-May-19

10

A2310

DRAINAGE PIPE CULVERTS

22-Nov-18

08-Dec-18

14

0%

25

22-Jan-19

19-Feb-19

10

A2320

ROAD SAFETY CRASH BARRIERS AND BOLLARD

22-Nov-18

16-Dec-18

21

0%

16

07-May-19

26-May-19

10

A2350

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

17-Dec-18

24-Dec-18

7

0%

16

07-May-19

26-May-19

10

A2230-1

PROTECTION OF UNDERGROUND CABLES

0

0%

14

26-Dec-18

10-Jan-19

10

A2280-3

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL

0

0%

21

25-Nov-18

18-Dec-18

107

28 28

0%

47 15

20-Dec-18 20-Dec-18

12-Feb-19 06-Jan-19

3 3

TEST SEPERATOR SEPERAT A2240 EXCAVATION

29-May-18 29-May-18

30-Jun-18 30-Jun-18

A2240-2

CURING

0

0%

8

26-Jan-19

03-Feb-19

3

A2240-1

FOUNDATION (STEEL FIXING)

0

0%

15

06-Jan-19

22-Jan-19

3

A2240-11

FOUNDATION (CONCRETE)

0

0%

11

19-Jan-19

30-Jan-19

3

A2250

BLINDING

0

0%

6

02-Jan-19

08-Jan-19

3

A2270

FORMWORK FOR FOUNDATION

0

0%

8

14-Jan-19

22-Jan-19

3

A2240-22

WATER PROOFING (BITUMEN COATING)

0

0%

9

29-Jan-19

07-Feb-19

3

A2240-32

BACKFILL

0

0%

9

03-Feb-19

12-Feb-19

3

0 0

01-Jan-19 01-Jan-19

25-Feb-19 26-Jan-19

27 27

11-Feb-19

18-Feb-19

27

0%

48 22

A2240-82

CURING

0

0%

7

A2240-62

FOUNDATION (STEEL FIXING)

0

0%

15

22-Jan-19

07-Feb-19

27

A2240-72

FOUNDATION (CONCRETE)

0

0%

9

06-Feb-19

16-Feb-19

27

A5880

BLINDING

0

0%

9

22-Jan-19

31-Jan-19

27

A5890

FORMWORK FOR FOUNDATION

0

0%

7

31-Jan-19

07-Feb-19

27

A2240-42

WATER PROOFING (BITUMEN COATING)

0

0%

7

16-Feb-19

23-Feb-19

27

A2240-52

BACKFILL

0

0%

7

18-Feb-19

25-Feb-19

27

0 0

0%

34 12

30-Dec-18 30-Dec-18

06-Feb-19 12-Jan-19

4 4

TEST SEPERAT SEPERATOR PLATFORM A5900 EXCAVATION

METERING SKID SK A2240-12 EXCAVATION A2240-92

BLINDING

0

0%

7

01-Jan-19

08-Jan-19

4

A2240-102

FOUNDATION (STEEL FIXING)

0

0%

9

05-Jan-19

14-Jan-19

4

A2240-112

FOUNDATION (CONCRETE)

0

0%

9

12-Jan-19

21-Jan-19

4

A2240-122

FORMWORK FOR FOUNDATION

0

0%

5

09-Jan-19

14-Jan-19

4

A2240-132

CURING

0

0%

7

21-Jan-19

28-Jan-19

4

A2240-142

WATERPROOFING (BITUMEN COATING)

0

0%

3

28-Jan-19

30-Jan-19

4

A2240-152

BACKFILL

0

PIPE SUPPORT A2260 FOUNDATION WORK (STEEL FIXING)

01-Jul-18 01-Jul-18

24-Jul-18 24-Jul-18

0%

7

30-Jan-19

06-Feb-19

4

21 21

0%

64 26

04-Aug-18 A 13-Nov-18

07-Jan-19 12-Dec-18

7 0

A2235-4

EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS

0

60%

26

04-Aug-18 A

24-Nov-18

0

A2260-1

FOUNDATION WORK (CONCRETE)

0

0%

26

21-Nov-18

20-Dec-18

0

A2260-2

CURING

0

0%

26

24-Nov-18

23-Dec-18

0

A2260-3

BLINDING CONCRETE FOR PS FOUNDATIONS

0

0%

25

07-Nov-18

05-Dec-18

0

A2260-4

FORMWORK FOR FOR PS FOUNDAITON

0

0%

20

20-Nov-18

12-Dec-18

0

A2260-5

WATER PROOFING (BITUMENT COATING)

0

0%

20

09-Dec-18

31-Dec-18

7

A2260-6

BACKFILLING

0

0%

20

16-Dec-18

07-Jan-19

7

7 7

0%

55 15

20-Dec-18 06-Jan-19

21-Feb-19 22-Jan-19

38 38

PSV A2280

FOUNDATION WORK (STEEL FIXING)

25-Jul-18 25-Jul-18

01-Aug-18 01-Aug-18

A2235-5

EXCAVATION (INCLUDING AREA LIGHTING POLES)

0

0%

15

20-Dec-18

06-Jan-19

38

A2280-1

FOUNDATION WORK (CONCRETE)

0

0%

15

22-Jan-19

07-Feb-19

38

A2280-2

CURING / WATERPROOFING / BACK FILLING

0

0%

13

07-Feb-19

21-Feb-19

38

76

24-Dec-18

21-Mar-19

44

Structural Steel

29-Oct-18

17-Nov-18

17

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 43 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule.

Page 31 of32

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

29-Oct-18 29-Oct-18

05-Nov-18 05-Nov-18

7 7

0%

21 21

26-Feb-19 26-Feb-19

21-Mar-19 21-Mar-19

27 27

0

0%

21

26-Feb-19

21-Mar-19

27

METERING SKID SK A2740 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W

01-Nov-18 01-Nov-18

06-Nov-18 06-Nov-18

5 5

0%

12 12

04-Feb-19 04-Feb-19

17-Feb-19 17-Feb-19

4 4

PSV A2750

05-Nov-18 05-Nov-18

10-Nov-18 10-Nov-18

5 5

0%

11 11

25-Feb-19 25-Feb-19

09-Mar-19 09-Mar-19

38 38

11-Nov-18 11-Nov-18

13-Nov-18 13-Nov-18

3 3

0%

28 28

24-Dec-18 24-Dec-18

24-Jan-19 24-Jan-19

92 0

0

0%

15

24-Dec-18

09-Jan-19

105

TEST SEPERATOR SEPERAT A2730 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2730-1

INSTALLATION OF LADDERS, STAIRS, HANDRAILS

INSTALLATION OF PSV VALVES ACCESS PLATFORMS

PIPE SUPPORT A2760 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS A2760-1

MODIFICATIONS OF EXISTING PIPE SUPORT / ACCESS PLATFORMS

FIELD INSTRUMENT INSTRUM A2770 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2900

INSTALLATION OF NEW TEST SEPARATOR

Piping PIPE INSTALATION INSTALAT & Pre Shutdown WORKS A3230 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT

14-Nov-18 14-Nov-18

17-Nov-18 17-Nov-18

3 3

0%

5 5

26-Jan-19 26-Jan-19

30-Jan-19 30-Jan-19

41 41

11-Oct-18 11-Oct-18

28-Oct-18 28-Oct-18

15 15

0%

4 4

07-Feb-19 07-Feb-19

11-Feb-19 11-Feb-19

3 3

02-Oct-18 02-Oct-18 02-Oct-18

29-Nov-18 17-Nov-18 17-Oct-18

51 40 14

0%

69 62 20

02-Feb-19 02-Feb-19 02-Feb-19

22-Apr-19 14-Apr-19 24-Feb-19

0 1 0

A3240

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

29-Oct-18

05-Nov-18

7

0%

6

06-Apr-19

11-Apr-19

3

A3250

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

06-Nov-18

08-Nov-18

3

0%

11

25-Mar-19

06-Apr-19

0

A3260

PIPING TIE-IN / NDT PRE SHUT DOWN

10-Nov-18

17-Nov-18

7

0%

6

08-Apr-19

14-Apr-19

0

A3260-a

MOBILIZATION OF OF TEAM APPLY PTW

0

0%

1

06-Apr-19

06-Apr-19

0

A3260-b

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

0

0%

7

06-Apr-19

13-Apr-19

0

A3230-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

9

07-Feb-19

17-Feb-19

48

MOBILIZATION OF HOT TAPPING SUB CONTRACTOR

10-Nov-18 10-Nov-18

29-Nov-18 12-Nov-18

18 3

0%

23 3

11-Mar-19 11-Mar-19

06-Apr-19 13-Mar-19

1 1

HT1170

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

13-Nov-18

24-Nov-18

10

0%

8

14-Mar-19

23-Mar-19

1

HT1180

HOT TAPPING / NDT

25-Nov-18

27-Nov-18

3

0%

6

24-Mar-19

30-Mar-19

1

HT1190

HOT TAPPING COMPLETE / REMOVE SCAFFOLD

28-Nov-18

29-Nov-18

2

0%

3

03-Apr-19

06-Apr-19

1

10-Nov-18 10-Nov-18

12-Nov-18 12-Nov-18

3 3

0%

7 2

15-Apr-19 21-Apr-19

22-Apr-19 22-Apr-19

0 0

0

0%

7

15-Apr-19

22-Apr-19

0

HOT TAPPING HT1160

Plant Shutdown Tie-in A3261 REPLACE THE SHUTVALVE AT POINT OF OIL-IN TIE-IN / INSTALL SDV A3260-1

PIPING TIE-IN / NDT SHUT DOWN CABLE GLANDING AND TERMINATION

21-May-18 21-May-18

19-Nov-18 05-Jun-18

157 14

0%

93 9

03-Dec-18 21-Feb-19

20-Mar-19 03-Mar-19

4 5

A3840

CABLE TRAY INSTALLATION

29-May-18

13-Jun-18

14

0%

13

17-Feb-19

03-Mar-19

4

A3830

U/G CABLE LAYING

06-Jun-18

13-Jun-18

7

0%

9

13-Feb-19

23-Feb-19

5

A3850

ELECTRICAL EQUIPMENTS INSTALLATION

21-Oct-18

28-Oct-18

7

0%

17

21-Feb-19

12-Mar-19

4

A3860

CABLE LAYING

29-Oct-18

05-Nov-18

7

0%

10

20-Feb-19

03-Mar-19

4

A3870

LIGHTING INSTALLATION

29-Oct-18

05-Nov-18

7

0%

7

05-Mar-19

12-Mar-19

4

A3880

ELECTRICAL TIE-INS

06-Nov-18

13-Nov-18

7

0%

3

14-Mar-19

17-Mar-19

4

A3890

ENERGIZATION

14-Nov-18

19-Nov-18

5

0%

4

17-Mar-19

20-Mar-19

4

A3830-1

BACK FILLING OF CABLE TRENCH

0

0%

8

23-Feb-19

03-Mar-19

5

A3890-1

HOOK UP

0

0%

3

12-Mar-19

14-Mar-19

4

A3940

EARTH PIT DRILLING

0

0%

5

19-Jan-19

23-Jan-19

5

A6530

CABLE TRENCHES

0

0%

21

03-Dec-18

26-Dec-18

10

Electrical A3820

Instrument & Control Co A4260 CABLE TRAY AND SUPPORT INSTALLATION

13-Oct-18 13-Oct-18

27-Nov-18 28-Oct-18

40 14

0%

40 16

16-Feb-19 16-Feb-19

02-Apr-19 05-Mar-19

2 2

05-Nov-18

7

0%

4

30-Mar-19

02-Apr-19

2

A4270

INSTRUMENT EQUIPMENT CALIBRATION/ LOOP TEST

29-Oct-18

A4920

DCS MODIFICATION IN CONTROL ROOM BY VENDOR

29-Oct-18

11-Nov-18

12

0%

10

19-Mar-19

30-Mar-19

2

A5000

JB SUPPORT INSTALLATION

31-Oct-18

02-Nov-18

3

0%

3

03-Mar-19

05-Mar-19

2

A5050

CABLE GLANDING AND TERMINATION (ALONG JBs)

04-Nov-18

06-Nov-18

3

0%

10

09-Mar-19

19-Mar-19

2

A4280

INSTRUMENT EQUIPEMNT INSTALLATION (RO, CONTROL VALVE, PRV, SDV

06-Nov-18

13-Nov-18

7

0%

9

11-Mar-19

20-Mar-19

2

A5060

CABLE GLAND AND TERMINATION (ALONG INSTRUMENTS)

06-Nov-18

09-Nov-18

3

0%

6

18-Mar-19

24-Mar-19

4

A4290

INSTRUMENT CABLE LAYING

14-Nov-18

19-Nov-18

5

0%

17

28-Feb-19

19-Mar-19

2

A5340

INSTALLATION OF DELUGE

20-Nov-18

27-Nov-18

7

0%

9

11-Mar-19

20-Mar-19

5

A4290-1

SS TUBE AND LEAK TEST

0

0%

3

19-Mar-19

21-Mar-19

5

A4280-1

INSTALLATION OF INSTRUMENT VALVE

0

0%

3

16-Mar-19

18-Mar-19

3

A4280-2

FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)

0

0%

7

11-Mar-19

18-Mar-19

3

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 44 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Updated Revised Baseline Schedule. BL1 Start

BL1 Finish

Page 32 of32

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

3

A4280-3

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

3

16-Mar-19

18-Mar-19

A5040

JB INSTALLATION

0

0%

3

06-Mar-19

09-Mar-19

2

28-Feb-19 02-Mar-19

28-Mar-19 05-Mar-19

21 38

F&G SUPPORT INSTALLATION

0 0

0%

25 4

A6460

F&G DEVICES INSTALLATION

0

0%

4

05-Mar-19

09-Mar-19

38

A6440

F&G CABLE INSTALLATION

0

0%

9

28-Feb-19

10-Mar-19

37

A6470

F&G JB SUPPORT INSTALLATION

0

0%

2

06-Mar-19

07-Mar-19

39

A6480

F&G JB INSTALLATION

0

0%

2

09-Mar-19

10-Mar-19

37

A6490

F&G CABLE GLANDING AND TERMINATION

0

0%

5

19-Mar-19

24-Mar-19

21

A6500

F&G LOOP PREPARATION

0

0%

2

24-Mar-19

25-Mar-19

21

A6510

F&G LOOP TESTING

0

F&G System A6450

Painting & Fireproofing Firep A4490 PIPING PAINTING AND TOUCH-UP

0%

4

25-Mar-19

28-Mar-19

21

10-Nov-18 10-Nov-18

03-Dec-18 17-Nov-18

21 7

0%

18 9

19-Mar-19 27-Mar-19

08-Apr-19 06-Apr-19

3 4

A4480

STRUCTURAL STEEL PAINTING AND TOUCH-UP

18-Nov-18

25-Nov-18

7

0%

10

19-Mar-19

30-Mar-19

3

A4500

FIREPROOFING FOR STRUCTURAL STEEL

26-Nov-18

03-Dec-18

7

0%

13

25-Mar-19

08-Apr-19

3

10-Nov-18 10-Nov-18

08-Dec-18 17-Nov-18

25 7

17%

173 135

27-Sep-18 A 27-Sep-18 A

14-May-19 31-Mar-19

0 18

Pre-commisionin Pre-commisioning A4810 PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING A4850

INST LOOP AND FUNCITONAL TESTING

10-Nov-18

08-Dec-18

25

0%

4

23-Apr-19

27-Apr-19

0

A4820

ELECTRICAL LIGHITING TEST

13-Nov-18

15-Nov-18

3

0%

5

28-Apr-19

02-May-19

0

A4830

LEAK TEST FOR SEPARATOR AND PIPING

28-Nov-18

01-Dec-18

3

0%

4

06-May-19

11-May-19

0

A4840

PUNCHLIST

02-Dec-18

04-Dec-18

3

0%

2

12-May-19

14-May-19

0

A4820-1

DELUGE SKID FUNCTIONAL TESTING

0 17-Dec-18

START OF PRODUCTION

08-Dec-18 08-Dec-18

A5260

COMMISSIONING AND STARTUP

09-Dec-18

A5270

PERFORMANCE TESTS

12-Dec-18

Commissioning A5250

As Built and Final Dossier A5290

FINAL PUNCH LIST AND CLOSE OUT DOCUMENTATION

0%

2

04-May-19

05-May-19

0

8 3

15-May-19 15-May-19

22-May-19

0%

7 0

0 0

12-Dec-18

3

0%

3

15-May-19

18-May-19

0

17-Dec-18

7

0%

3

19-May-19

22-May-19

0

17-Dec-18

18-Feb-19

54

53

22-May-19

22-Jul-19

0

17-Dec-18

18-Feb-19

54

53

22-May-19

22-Jul-19

0

0%

F 1

M 2

A 3

M 4

2017 J Jul A 5 6 7

29-Nov-18 S 8

17:46

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 45 of 170

PROJECT PLANNING PACKAGE

Attachment 2

CRITICAL PATH

Page 46 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

Rev-D by TA E EPIC for Replacement of Old 3-Phase Test Separators at All

U3963- Critical Activities TF>5 BL1 Start

BL1 Finish

BL1 Duration

27-Sep-17

18-Feb-19

544

08-Oct-18

Phy. % Com.

Page 1 of11

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

290

06-Feb-18 A

22-Jul-19

0

152

26-Jan-19

18-Feb-19

115

22-Jul-19

0

DE3380

ALL WORKS COMPLETE - MS1

18-Dec-18

0

0%

0

22-May-19*

0

DE1010

ACHIEVED - SCHEDULE COMPLETE

18-Feb-19

0

0%

0

22-Jul-19*

0

08-Dec-18

52

Milestone

08-Oct-18

Construction

08-Oct-18

26-Jan-19

22-May-19

0

0 0

0 0

22-Apr-19

0%

22-Apr-19 22-Apr-19

0 0

08-Dec-18 08-Oct-18

52 0

100 0

26-Jan-19

0%

22-May-19 27-Jan-19*

0 0

Fahahil Main Tie-ins Tie A1460 SHUTDOWN TIE-INS Commissioninng A1260 COMPLETE OF COMMISSIONING AT KHATIYAH MAIN

100

A1270

COMPLETE OF COMMISSIONING AT KHATIYAH NORTH

30-Oct-18

0

0%

0

29-Jan-19*

0

A1280

COMPLETE OF COMMISSIONING AT KHATIYAH SOUTH

10-Nov-18

0

0%

0

26-Jan-19*

0

A1290

COMPLETE OF COMMISSIONING AT JALM

17-Nov-18

0

0%

0

06-Apr-19*

0

A1300

COMPLETE OF COMMISSIONING AT FAHAHIL SOUTH

26-Nov-18

0

0%

0

20-May-19*

0

A1320

COMPLETE OF COMMISSIONING AT FAHAHIL MAIN

26-Nov-18

0

0%

0

22-May-19*

0

A1310

COMPLETE OF COMMISSIONING AT FAHAHIL NORTH

08-Dec-18

0

0%

0

09-May-19*

0

18-Feb-19

0

22-Jul-19

0

18-Feb-19

0

22-Jul-19

0

27-Sep-17

09-May-18

224

99

23-Feb-18 A

31-Jan-19

0

27-Sep-17

09-May-18

224

99

23-Feb-18 A

31-Jan-19

0

27-Sep-17 27-Sep-17 27-Sep-17

09-May-18 22-Mar-18 22-Mar-18

224 176 220

90%

99 64 64

23-Feb-18 A 01-Apr-18 A 01-Apr-18 A

31-Jan-19 27-Dec-18 27-Dec-18

0 4 4

22-Mar-18

0

0%

0

09-May-18 09-May-18

224 280

55%

99 99

0%

18-Feb-19

Final documentation documenta & As Built / Handover A1250

FINAL DOCUMENTATION / HANDOVER DOSSIER

Procurement EQUIPMENTS Safety Fire Fighting Equipments Eq PC1500 MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-FIRE FIGHTING EQUIP PC1510 Deludge Skid PC1050 PC1060

DELIVERED AT SITE- FIRE FIGHTING EQUIPMENTS MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DELUDGE SKID

27-Sep-17 27-Sep-17

DELIVERED AT SITE-DELUDGE SKID -1st LOT (Khatiya Stations)

0 0%

22-Jul-19

0

27-Dec-18

4

23-Feb-18 A 23-Feb-18 A

31-Jan-19 31-Jan-19

0 0

09-May-18

0

31-Dec-18

0

30-Dec-17

18-Dec-18

380

225

06-Feb-18 A

22-May-19

0

01-Feb-18

19-Nov-18

250

80

06-Feb-18 A

26-Jan-19

0

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F220 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS

25-Feb-18 26-Feb-18 26-Feb-18 26-Feb-18

29-Mar-18 14-Mar-18 11-Mar-18 11-Mar-18

29 15 12 12

95%

43 14 10 10

06-Feb-18 A 06-Feb-18 A 16-Aug-18 A 16-Aug-18 A

13-Dec-18 10-Nov-18 05-Nov-18 05-Nov-18

0 3 0 0

PIPE SUPPORT F230 FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATION

12-Mar-18 12-Mar-18

14-Mar-18 14-Mar-18

3 3

98%

14 14

06-Feb-18 A 06-Feb-18 A

10-Nov-18 10-Nov-18

3 3

25-Feb-18 25-Feb-18 25-Feb-18

29-Mar-18 29-Mar-18 29-Mar-18

29 29 29

0%

43 43 34

08-Oct-18 A 08-Oct-18 A 08-Oct-18 A

13-Dec-18 13-Dec-18 03-Dec-18

0 0 0

0

0%

9

04-Dec-18

13-Dec-18

0

0 0

0%

26 26

21-Oct-18 A 21-Oct-18 A

24-Nov-18 24-Nov-18

3 3

0%

66 66 66 20

06-Aug-18 A 06-Aug-18 A 06-Aug-18 A 08-Dec-18

09-Jan-19 09-Jan-19 09-Jan-19 30-Dec-18

5 5 5 5

CONSTRUCTION WORKS KAHS

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F290 PIPING FABRICATION & FBE COATING AT KUWAIT F320-2

FBE PIPING BULK DELIVER AT SITE

REMAINING PIPING PI (NON - FBE) F290-1 COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATING

0

DRAINAGE PIPE CULVERTS

01-Feb-18 27-Oct-18 27-Oct-18 27-Oct-18

19-Nov-18 19-Nov-18 19-Nov-18 11-Nov-18

250 21 21 14

A1780

UTILITY ROAD CROSSINGS

27-Oct-18

19-Nov-18

21

0%

26

11-Dec-18

09-Jan-19

5

A1780-2

CABLE TRENCHES

0

35%

25

24-Sep-18 A

22-Nov-18

2

A1710-1

PROTECTION OF UNDERGROUND CABLES

0

90%

25

14-Sep-18 A

22-Nov-18

5

A1715-6

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPLICAB

0

98%

8

06-Aug-18 A

03-Nov-18

2

10%

24 24 24

27-Sep-18 A 27-Sep-18 A 27-Sep-18 A

21-Nov-18 21-Nov-18 21-Nov-18

0 0 0

INSTALLATION Civil Works COMMON A1790

Structural Steel TEST SEPERATOR SEPERAT A2480 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PLATF Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone

3963-Rev-D.-1

20-Aug-18 20-Aug-18 20-Aug-18

27-Aug-18 27-Aug-18 27-Aug-18

7 7 7

Page 1 of 11

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

F M 1 2

A 3

M 4

29-Nov-18 2017 J Jul A 5 6 7

Date 29-Nov-18

S 8

17:49

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

U-3963_REV-D Revision

Checked

Approved

Critical Path

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan U3963- Critical Activities TF>5

Page 47 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

Piping STATION PIPING PIPIN A3020 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT

U3963- Critical Activities TF>5 BL1 Start

BL1 Finish

BL1 Duration

09-Aug-18 09-Aug-18 09-Aug-18

17-Sep-18 17-Sep-18 01-Sep-18

Page 2 of11

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

34 34 20

0%

22 22 18

16-Dec-18 16-Dec-18 16-Dec-18

09-Jan-19 09-Jan-19 05-Jan-19

4 4 0

A3030

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

20-Aug-18

26-Aug-18

6

0%

4

06-Jan-19

09-Jan-19

4

A3040

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

02-Sep-18

05-Sep-18

4

0%

12

24-Dec-18

06-Jan-19

3

A3050

TIE-IN

06-Sep-18

17-Sep-18

10

0%

4

06-Jan-19

09-Jan-19

0

A3020-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

9

24-Dec-18

02-Jan-19

0

A3051-1

REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV

0

0%

3

07-Jan-19

09-Jan-19

3

U/G CABLE LAYING

01-Feb-18 01-Feb-18

13-Oct-18 08-Feb-18

218 7

0%

52 5

08-Nov-18 29-Nov-18

07-Jan-19 04-Dec-18

5 5

A3470

CABLE TRAY INSTALLATION

28-Aug-18

12-Sep-18

14

0%

8

22-Nov-18

01-Dec-18

0

A3480

ELECTRICAL EQUIPMENTS INSTALLATION

13-Sep-18

20-Sep-18

7

0%

10

09-Dec-18

19-Dec-18

5

A3490

CABLE LAYING

22-Sep-18

29-Sep-18

7

0%

8

02-Dec-18

10-Dec-18

5

A3500

LIGHTING FIXTURE AND DB INSTALLATION

22-Sep-18

29-Sep-18

7

0%

8

16-Dec-18

24-Dec-18

5

A3510

ELECTRICAL TIE-INS

30-Sep-18

07-Oct-18

7

0%

2

03-Jan-19

05-Jan-19

5

A3520

ENERGIZATION

08-Oct-18

13-Oct-18

5

0%

3

05-Jan-19

07-Jan-19

5

A3460-1

BACK FILLING OF CABLE TRENCH

0

0%

9

02-Dec-18

11-Dec-18

5

A3510-1

HOOK UP

0

0%

4

25-Dec-18

29-Dec-18

5

A3530

EARTH PIT DRILLING

0

0%

4

08-Nov-18

12-Nov-18

0

13-Nov-18 25-Dec-18

08-Jan-19 05-Jan-19

0 0

Electrical A3460

Instrument & Control Co A4090 DCS MODIFICATION IN CONTROL ROOM BY VENDOR

20-Aug-18 20-Aug-18

17-Nov-18 02-Sep-18

77 12

0%

49 10

A4050

CABLE TRAY AND SUPPORTS INSTALLATION

01-Sep-18

16-Sep-18

14

0%

17

13-Nov-18

02-Dec-18

0

A4060

INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING

17-Sep-18

24-Sep-18

7

0%

4

05-Jan-19

08-Jan-19

0

A4070

INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, RELIEF VALVE & CONTROL

25-Sep-18

02-Oct-18

7

0%

6

20-Dec-18

26-Dec-18

0

A4080

SS TUBING AND LEAK TEST

03-Oct-18

08-Oct-18

5

0%

4

01-Jan-19

05-Jan-19

0

A5300

INSTALLATION OF DELUGE

09-Oct-18

16-Oct-18

7

0%

7

01-Jan-19

08-Jan-19

0

A4640

JB SUPPORT INSTALLATION

21-Oct-18

23-Oct-18

3

0%

4

02-Dec-18

05-Dec-18

0

A4740

JB INSTALLATION

14-Nov-18

17-Nov-18

3

0%

3

04-Dec-18

06-Dec-18

0

A4080-1

INSTRUMENT CABLE LAYING

0

0%

17

05-Dec-18

24-Dec-18

0

A4080-11

CABLE GLANDS AND TERMINATION (ALONG JBs)

0

0%

10

24-Dec-18

03-Jan-19

0

15-Dec-18 15-Dec-18

06-Jan-19 27-Dec-18

4 4

Painting & Fireproofing Firep A4360 STRUCTURAL STEEL PAINTING AND TOUCH-UP

28-Aug-18 28-Aug-18

13-Sep-18 04-Sep-18

15 7

0%

20 12

A4380

FIREPROOFING FOR STRUCTURAL STEEL

05-Sep-18

12-Sep-18

7

0%

16

19-Dec-18

06-Jan-19

4

A4370

PIPING PAINTING AND TOUCH-UP

06-Sep-18

13-Sep-18

7

0%

4

24-Dec-18

27-Dec-18

4

06-Sep-18 06-Sep-18

25-Oct-18 09-Sep-18

43 3

0%

11 3

06-Jan-19 06-Jan-19

17-Jan-19 08-Jan-19

1 0

Pre-commisionin Pre-commisioning A3051 INST LOOP AND FUNCTIONAL TEST A4650

DELUGE SKID FUNCTIONAL TESTING

02-Oct-18

25-Oct-18

21

0%

5

09-Jan-19

14-Jan-19

4

A4620

ELECTRICAL LIGHITING TEST

06-Oct-18

08-Oct-18

3

0%

5

08-Jan-19

13-Jan-19

0

A4630

PUNCHLIST

17-Oct-18

20-Oct-18

3

0%

4

14-Jan-19

17-Jan-19

0

A4620-1

LEAK TEST FOR PIPING AND SEPARATOR

0

0%

5

08-Jan-19

13-Jan-19

0

7 3

17-Jan-19 17-Jan-19

26-Jan-19

0%

8 0

0 0

3

0%

4

17-Jan-19

21-Jan-19

0

0%

09-Nov-18

START OF PRODUCTION

01-Nov-18 01-Nov-18

A5020

COMMISSIONING AND STARTUP

01-Nov-18

04-Nov-18

A5030

PERFORMANCE TESTS

04-Nov-18

09-Nov-18

7

4

22-Jan-19

26-Jan-19

0

24-Jan-18

18-Dec-18

282

83

09-May-18 A

29-Jan-19

0

24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18

14-Feb-18 14-Feb-18 10-Feb-18 10-Feb-18

19 19 15 15

90%

38 17 17 17

09-May-18 A 09-May-18 A 19-Sep-18 A 19-Sep-18 A

08-Dec-18 13-Nov-18 13-Nov-18 13-Nov-18

3 3 3 3

11-Feb-18 11-Feb-18

14-Feb-18 14-Feb-18

4 4

99%

17 17

09-May-18 A 09-May-18 A

13-Nov-18 13-Nov-18

0 0

0 0 0

0%

37 37 33

27-Oct-18 27-Oct-18 27-Oct-18

08-Dec-18 08-Dec-18 03-Dec-18

3 3 3

0

0%

13

24-Nov-18

08-Dec-18

3

68 47 34

02-Oct-18 A 02-Oct-18 A 02-Oct-18 A

12-Jan-19 18-Dec-18 03-Dec-18

3 3 3

Commissioning A5010

KAHN FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F110 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS PIPE SUPPORT F120 COMPLETE FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INS Piping Fabrication Fabricati REMAINING PIPING PI ( NON FBE) F180-1 COMPLETE PIPING FABRICATION . HYDROTEST/ PAINTING & COATING F210-1

FABRICATION SPOOLS DELIVER TO SITE

INSTALLATION Structural Steel TEST SEPERATOR SEPERAT

07-Jul-18 16-Jul-18 16-Jul-18

18-Dec-18 24-Jul-18 23-Jul-18

142 8 7

F M 1 2

A 3

M 4

29-Nov-18 2017 J Jul A 5 6 7

S 8

17:49

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 48 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

A2360

INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PLATF

U3963- Critical Activities TF>5 BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

16-Jul-18

23-Jul-18

7

METERING SKID SK A2360-1 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK WAY O PIPE SUPPORT A2370 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS OF

Page 3 of11

19-Jul-18 19-Jul-18

24-Jul-18 24-Jul-18

FIELD INSTRUMENT INSTRUM A2370-1 INSTALLATION OF INSTRUMENT STANCHION

15%

34

02-Oct-18 A

03-Dec-18

3

0 0

15%

37 37

04-Oct-18 A 04-Oct-18 A

06-Dec-18 06-Dec-18

3 3

5 5

0%

47 47

11-Oct-18 A 11-Oct-18 A

18-Dec-18 18-Dec-18

0 0

0 0

0%

4 4

15-Dec-18 15-Dec-18

18-Dec-18 18-Dec-18

3 3

10-Dec-18 10-Dec-18 10-Dec-18

06-Jan-19 06-Jan-19 29-Dec-18

4 4 0

0%

24 24 17

A2930

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

14-Aug-18

19-Aug-18

5

0%

4

02-Jan-19

06-Jan-19

0

A2950

TIE-IN

14-Aug-18

21-Aug-18

7

0%

4

02-Jan-19

06-Jan-19

0

A2920-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

8

19-Dec-18

27-Dec-18

0

A2951-1

REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV

0

0%

3

03-Jan-19

06-Jan-19

4

13-Nov-18 06-Dec-18

12-Jan-19 20-Dec-18

3 3

Piping PIPING -REMAINING -REMA A2920 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT

07-Jul-18 07-Jul-18 07-Jul-18

21-Aug-18 21-Aug-18 09-Aug-18

40 40 30

U/G CABLE LAYING

16-Jul-18 16-Jul-18

08-Sep-18 23-Jul-18

47 7

0%

52 13

A3290

CABLE TRAY INSTALLATION

24-Jul-18

08-Aug-18

14

0%

8

06-Dec-18

15-Dec-18

3

A3300

ELECTRICAL EQUIPMENTS INSTALLATION

09-Aug-18

16-Aug-18

7

0%

12

18-Dec-18

31-Dec-18

3

A3310

CABLE LAYING

18-Aug-18

25-Aug-18

7

0%

17

09-Dec-18

27-Dec-18

3

A3320

LIGHTING FIXTURE AND DB INSTALLATION

18-Aug-18

25-Aug-18

7

0%

6

25-Dec-18

31-Dec-18

3

A3330

ELECTRICAL TIE-INS

26-Aug-18

02-Sep-18

7

0%

5

05-Jan-19

09-Jan-19

3

A3340

ENERGIZATION

03-Sep-18

08-Sep-18

5

0%

3

09-Jan-19

12-Jan-19

3

A3310-1

HOOK UP

0

0%

5

31-Dec-18

05-Jan-19

3

A6000

EARTH PIT DRILLING

0

0%

4

13-Nov-18

17-Nov-18

5

22-Nov-18 22-Nov-18

07-Jan-19 12-Dec-18

3 3

Electrical A3280

Instrument & Control Co A3950 CABLE TRAY AND SUPPORTS INSTALLATION

28-Jul-18 28-Jul-18

18-Dec-18 12-Aug-18

124 14

0%

40 18

A3960

INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING

13-Aug-18

20-Aug-18

7

0%

4

02-Jan-19

06-Jan-19

3

A3990

DCS MODIFICATION IN CONTROL ROOM BY VENDOR

14-Aug-18

20-Aug-18

6

0%

9

29-Dec-18

07-Jan-19

3

A3970

INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, PRV & CONTROL VALVE)

21-Aug-18

28-Aug-18

7

0%

7

26-Dec-18

02-Jan-19

3

A3980

INSTRUMENT CABLE LAYING

29-Aug-18

03-Sep-18

5

0%

18

11-Dec-18

31-Dec-18

3

A4870

JB INSTALLATION

27-Sep-18

30-Sep-18

3

0%

3

11-Dec-18

13-Dec-18

3

A4790

JB SUPPORT INSTALLATION

16-Dec-18

18-Dec-18

3

0%

3

09-Dec-18

11-Dec-18

3

A3970-1

FIELD INSTRUMENT INSTALLATION (GAUGES / TRANSMITTERS)

0

0%

6

24-Dec-18

30-Dec-18

3

A3970-2

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

3

29-Dec-18

31-Dec-18

4

A3970-11

CABLE GLAND AND TERMINATION (ALONG JBs)

0

0%

4

25-Dec-18

29-Dec-18

3

A3970-21

CABLE GLAND AND TERMINTATION (ALONG INSTRUMENTS)

0

0%

5

27-Dec-18

01-Jan-19

3

F&G CABLE GLANDING AND TERMINATION

0 0

0%

10 5

27-Dec-18 27-Dec-18

07-Jan-19 01-Jan-19

3 3

A6070

F&G LOOP PREPARATION

0

0%

2

01-Jan-19

02-Jan-19

3

A6080

F&G LOOP TESTING

0

0%

4

03-Jan-19

07-Jan-19

3

55 3

0%

75 4

09-Sep-18 A 02-Jan-19

20-Jan-19 06-Jan-19

0 3

F&G System A6060

Pre-commisionin Pre-commisioning A2951 INST LOOP AND FUNCTIONAL TEST

14-Aug-18 14-Aug-18

16-Oct-18 16-Aug-18

A4560

PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING

23-Sep-18

30-Sep-18

7

17%

58

09-Sep-18 A

31-Dec-18

4

A4600

ELECTRICAL LIGHTING TEST

23-Sep-18

16-Oct-18

21

0%

5

06-Jan-19

10-Jan-19

0

A4570

LEAK TEST FOR PIPING AND SEPARATOR

30-Sep-18

02-Oct-18

3

0%

4

12-Jan-19

15-Jan-19

0

A4580

PUNCHLIST

03-Oct-18

06-Oct-18

3

0%

4

16-Jan-19

20-Jan-19

0

A4570-1

DELUGE SKID FUNCTIONAL TESTING

0

0%

3

09-Jan-19

12-Jan-19

0

START OF PRODUCTION

17-Oct-18 17-Oct-18

30-Oct-18 20-Oct-18

11 3

0%

9 1

20-Jan-19 20-Jan-19

29-Jan-19 20-Jan-19

0 0

A4960

COMMISSIONING AND STARTUP

22-Oct-18

24-Oct-18

3

0%

5

20-Jan-19

24-Jan-19

0

A4970

PERFORMANCE TESTS

24-Oct-18

30-Oct-18

7

0%

5

24-Jan-19

29-Jan-19

0

30-Dec-17

08-Oct-18

242

81

06-Sep-18 A

27-Jan-19

0

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F0010 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS

30-Dec-17 30-Dec-17 30-Dec-17 30-Dec-17

11-Jan-18 11-Jan-18 11-Jan-18 11-Jan-18

12 12 12 12

23 23 23 23

06-Sep-18 A 06-Sep-18 A 06-Sep-18 A 06-Sep-18 A

20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18

0 0 0 0

INSTALLATION Structural Steel

31-Jan-18 19-Aug-18

25-Sep-18 21-Aug-18

204 3

48 9

17-Nov-18 20-Nov-18

10-Jan-19 29-Nov-18

3 0

Commissioning A4950

KAHM

98%

F M 1 2

A 3

M 4

29-Nov-18 2017 J Jul A 5 6 7

S 8

17:49

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 49 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Critical Activities TF>5

Page 4 of11

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

19-Aug-18 19-Aug-18

21-Aug-18 21-Aug-18

3 3

0%

9 9

20-Nov-18 20-Nov-18

29-Nov-18 29-Nov-18

0 0

U/G CABLE LAYING

31-Jan-18 31-Jan-18

25-Sep-18 08-Feb-18

204 7

0%

47 14

17-Nov-18 28-Nov-18

09-Jan-19 13-Dec-18

2 2

A3380

CABLE TRAY INSTALLATION

11-Aug-18

26-Aug-18

14

0%

9

25-Nov-18

04-Dec-18

0

A3390

ELECTRICAL EQUIPMENTS INSTALLATION

27-Aug-18

03-Sep-18

7

0%

12

15-Dec-18

27-Dec-18

2

A3400

CABLE LAYING

04-Sep-18

11-Sep-18

7

0%

15

10-Dec-18

26-Dec-18

2

A3410

LIGHTING FIXTURES AND DB INSTALLATION

04-Sep-18

11-Sep-18

7

0%

6

22-Dec-18

27-Dec-18

2

A3420

ELECTRICAL TIE-INS

12-Sep-18

19-Sep-18

7

0%

4

02-Jan-19

06-Jan-19

2

A3430

ENERGIZATION

20-Sep-18

25-Sep-18

5

0%

3

07-Jan-19

09-Jan-19

2

A3400-1

HOOK UP

0

0%

4

29-Dec-18

01-Jan-19

2

A3440

EARTH PIT DRILLING

0

TEST SEPERATOR SEPERAT A2460 INSTALLATION OF LADDERS, STAIRS, HANDRAILS Electrical A3370

Instrument & Control Co A4040 MODIFICATION OF EXISTING DCS SYSTEMS BY VENDOR

0%

4

17-Nov-18

20-Nov-18

5

02-Aug-18 02-Aug-18

20-Sep-18 15-Aug-18

43 12

0%

40 9

26-Nov-18 23-Dec-18

10-Jan-19 01-Jan-19

0 4

A4000

CABLE TRAY AND SUPPORT INSTALLATION

14-Aug-18

29-Aug-18

14

0%

16

26-Nov-18

13-Dec-18

0

A4010

INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING

30-Aug-18

06-Sep-18

7

0%

4

07-Jan-19

10-Jan-19

0

A4020

INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, PRV AND CONTROL VALVE

08-Sep-18

15-Sep-18

7

0%

7

25-Dec-18

01-Jan-19

0

A4030

INSTRUMENT CABLE LAYING

16-Sep-18

20-Sep-18

5

0%

18

05-Dec-18

25-Dec-18

0

A4030-1

SS TUBE INSTALLATION AND LEAK TEST

0

0%

4

02-Jan-19

06-Jan-19

0

A4020-3

INSTALLATION OF INSTRUMENT VALVE

0

0%

4

01-Jan-19

05-Jan-19

1

A4020-1

FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)

0

0%

7

25-Dec-18

01-Jan-19

0

A4020-2

INSTALLATION OF BS & W ANALYZERS ON METERING SKID

0

0%

3

30-Dec-18

01-Jan-19

4

A4020-11

CABLE GLAND TERMINATION (ALONG INSRUMENT)

0

0%

6

30-Dec-18

05-Jan-19

3

A4020-21

CABLE GLAND TERMINATION (ALONG JBs)

0

0%

7

30-Dec-18

06-Jan-19

0

F&G CABLE GLANDING AND TERMINATION

0 0

0%

10 5

31-Dec-18 31-Dec-18

10-Jan-19 05-Jan-19

3 3

A6160

F&G LOOP PREPARATION

0

0%

2

05-Jan-19

06-Jan-19

3

A6170

F&G LOOP TESTING

0

F&G System A6150

Pre-commisionin Pre-commisioning A3001 INST LOOP AND FUNCITONAL TEST

06-Sep-18 06-Sep-18

27-Sep-18 09-Sep-18

0%

4

07-Jan-19

10-Jan-19

3

19 3

0%

11 4

07-Jan-19 07-Jan-19

19-Jan-19 10-Jan-19

0 0

A4520

DELUGE SKID FUNCTIONAL TEST

12-Sep-18

15-Sep-18

3

0%

3

12-Jan-19

14-Jan-19

0

A4550

ELECTRICAL LIGHITING TEST

12-Sep-18

27-Sep-18

14

0%

5

09-Jan-19

14-Jan-19

0

A4530

PUNCHLIST

16-Sep-18

18-Sep-18

3

0%

4

15-Jan-19

19-Jan-19

0

A4520-1

LEAK TEST FOR SEPARATOR AND PIPING

0

0%

5

10-Jan-19

15-Jan-19

0

19-Jan-19 19-Jan-19

27-Jan-19 20-Jan-19

0 0

START OF PRODUCTION

29-Sep-18 29-Sep-18

08-Oct-18 01-Oct-18

8 3

0%

8 2

A4900

COMMISSIONING AND STARTUP

30-Sep-18

02-Oct-18

3

0%

4

19-Jan-19

22-Jan-19

0

A4910

PERFORMANCE TESTS

02-Oct-18

08-Oct-18

7

0%

5

22-Jan-19

27-Jan-19

0

Commissioning A4890

26-Feb-18

16-Nov-18

282

175

09-Jul-18 A

06-Apr-19

0

FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F330 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS

24-Mar-18 24-Mar-18 24-Mar-18 24-Mar-18

14-May-18 12-Apr-18 05-Apr-18 05-Apr-18

45 18 12 12

40%

64 48 48 48

11-Sep-18 A 11-Sep-18 A 11-Sep-18 A 11-Sep-18 A

09-Jan-19 22-Dec-18 22-Dec-18 22-Dec-18

0 0 0 0

METERING SKID SK F340 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO

07-Apr-18 07-Apr-18

09-Apr-18 09-Apr-18

3 3

80%

48 48

11-Sep-18 A 11-Sep-18 A

22-Dec-18 22-Dec-18

0 0

PSV F350

10-Apr-18 10-Apr-18

12-Apr-18 12-Apr-18

3 3

20%

48 48

12-Sep-18 A 12-Sep-18 A

22-Dec-18 22-Dec-18

0 0

31-Mar-18 31-Mar-18 31-Mar-18

14-May-18 14-May-18 30-Apr-18

39 39 27

0%

45 38 29

11-Oct-18 A 11-Oct-18 A 11-Oct-18 A

09-Jan-19 01-Jan-19 22-Dec-18

0 0 0

28-Apr-18

14-May-18

15

JALM

FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFER T

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F400 PIPING FABRICATION & FBE COATING AT KUWAIT F430

FBE PIPING BULK DELIVER AT SITE

REMAINING PIPING PI (NON FBE0 F400-1 COMPLETE PIPING FABRICATION HYDROTEST/ PAINTING & COATING F430-1 INSTALLATION Civil Works COMMOMN A1845-6

FABRICATION SPOOLS DELIVER TO SITE 26-Feb-18

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPLICAB

03-Nov-18

0%

9

23-Dec-18

01-Jan-19

0

0 0

0%

37 33

28-Nov-18 28-Nov-18

09-Jan-19 05-Jan-19

0 0

0

0%

13

26-Dec-18

09-Jan-19

0

70%

151 53 24 24

09-Jul-18 A 09-Jul-18 A 23-Aug-18 A 23-Aug-18 A

15-Mar-19 25-Dec-18 21-Nov-18 21-Nov-18

0 0 5 5

269 0 0 0

F M 1 2

A 3

M 4

29-Nov-18 2017 J Jul A 5 6 7

S 8

17:49

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 50 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Critical Activities TF>5 BL1 Start

BL1 Finish

PIPE SUPPORT A1845-3 EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS

Page 5 of11

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

0 0

98%

53 25

09-Jul-18 A 03-Aug-18 A

25-Dec-18 22-Nov-18

0 0

A1870-1

FOUNDATION WORK (STEEL FIXING)

0

92%

37

09-Jul-18 A

06-Dec-18

0

A1870-2

FOUNDATION WORK (CONCRETE)

0

75%

45

10-Sep-18 A

16-Dec-18

0

A1870-3

CURING / WATERPROOFING / BACK FILLING

0

60%

53

20-Sep-18 A

25-Dec-18

0

07-Oct-18 A 07-Oct-18 A 07-Oct-18 A

14-Jan-19 09-Jan-19 09-Jan-19

2 2 2

06-Sep-18 06-Sep-18 06-Sep-18

25-Sep-18 25-Sep-18 13-Sep-18

17 17 7

0%

68 64 64

23-Sep-18

25-Sep-18

3

0%

8

01-Jan-19

09-Jan-19

2

METERING SKID SK A2550 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK WAY O

10-Sep-18 10-Sep-18

15-Sep-18 15-Sep-18

5 5

0%

12 12

01-Jan-19 01-Jan-19

14-Jan-19 14-Jan-19

2 2

PSV A2560

13-Sep-18 13-Sep-18

18-Sep-18 18-Sep-18

5 5

0%

12 12

01-Jan-19 01-Jan-19

14-Jan-19 14-Jan-19

0 0

19-Sep-18 19-Sep-18

22-Sep-18 22-Sep-18

3 3

0%

16 16

27-Dec-18 27-Dec-18

14-Jan-19 14-Jan-19

0 0

27-Aug-18 27-Aug-18 27-Aug-18

08-Oct-18 18-Sep-18 18-Sep-18

46 20 20

0%

79 32 32

01-Jan-19 01-Jan-19 01-Jan-19

15-Mar-19 06-Feb-19 06-Feb-19

0 4 0

0

Structural Steel TEST SEPERATOR SEPERAT A2540 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PLATF A2580

INSTALLATION OF LADDERS, STAIRS, HANDRAILS

INSTALLATION OF PSV VALVES ACCESS PLATFORMS

PIPE SUPPORT A2570 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS OF Piping PIPING -REMAINING -REMA A3070 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT A3070-1

0%

9

27-Jan-19

05-Feb-19

5

MOBILIZATION OF HOT TAPPING SUB CONTRACTOR

18-Sep-18 18-Sep-18

08-Oct-18 20-Sep-18

18 3

0%

17 3

10-Feb-19 10-Feb-19

28-Feb-19 12-Feb-19

1 1

HT1090

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

22-Sep-18

02-Oct-18

10

0%

7

12-Feb-19

19-Feb-19

1

HT1100

FLARE TAPPING / NDT

03-Oct-18

06-Oct-18

3

0%

9

19-Feb-19

28-Feb-19

1

HT1110

FLARE TAPPING COMPLETE / REMOVE SCAFFOLD

07-Oct-18

08-Oct-18

2

0%

5

24-Feb-19

28-Feb-19

1

0 0

0%

24 2

21-Feb-19 04-Mar-19

15-Mar-19 05-Mar-19

0 0

6

05-Mar-19

11-Mar-19

0

HOT TAPPING HT1080

INSTALLATION OF BALL VALVE & GGC VALVE

Pre Shutdown and Plant Shutdown Tie-in A3100-2 MOBILIZATION OF OF TEAM APPLY PTW A3100-3

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

0

0%

A3100-4

PIPING TIE-IN / NDT PRE SHUT DOWN

0

0%

7

21-Feb-19

28-Feb-19

0

A3100-5

PIPING TIE-IN / NDT SHUT DOWN

0

0%

11

05-Mar-19

15-Mar-19

0

212 14

0%

84 10

25-Nov-18 05-Feb-19

02-Mar-19 16-Feb-19

2 5

CABLE GLAND AND TERMINATION

26-Feb-18 26-Feb-18

30-Oct-18 13-Mar-18

A3550

U/G CABLE LAYING

14-Mar-18

21-Mar-18

7

0%

13

12-Jan-19

26-Jan-19

4

A3560

CABLE TRAY INSTALLATION

15-Sep-18

30-Sep-18

14

0%

8

10-Jan-19

19-Jan-19

2

A3570

ELECTRICAL EQUIPMENTS INSTALLATION

01-Oct-18

08-Oct-18

7

0%

12

03-Feb-19

16-Feb-19

2

A3580

CABLE LAYING

09-Oct-18

16-Oct-18

7

0%

20

15-Jan-19

06-Feb-19

2

A3590

LIGHTING FIXTURES AND DB INSTALLATION

09-Oct-18

16-Oct-18

7

0%

6

10-Feb-19

16-Feb-19

2

A3600

ELECTRICAL TIE-INS

17-Oct-18

24-Oct-18

7

0%

6

20-Feb-19

26-Feb-19

2

A3610

ENERGIZATION

25-Oct-18

30-Oct-18

5

0%

4

26-Feb-19

02-Mar-19

2

A3580-1

HOOK UP

0

0%

4

17-Feb-19

20-Feb-19

2

A3550-1

BACK FILLING OF CABLE TRENCH

0

0%

13

26-Jan-19

09-Feb-19

4

A6180

CABLE TRENCHES

0

0%

25

25-Nov-18

23-Dec-18

5

A6190

EARTH PIT DRILLING

0

Electrical A3540

Instrument & Control Co A4140 DCS MODIFICATION IN CONTROL ROOM BY VENDOR

06-Sep-18 06-Sep-18

0%

6

04-Dec-18

10-Dec-18

5

03-Nov-18 12-Sep-18

50 6

0%

55 5

29-Dec-18 20-Feb-19

02-Mar-19 25-Feb-19

0 4

A4100

CABLE TRAY AND SUPPORTS INSTALLATION

18-Sep-18

03-Oct-18

14

0%

17

29-Dec-18

16-Jan-19

3

A4540

JB SUPPORT INSTALLATION

19-Sep-18

22-Sep-18

3

0%

3

16-Jan-19

19-Jan-19

3

A4880

JB INSTALLATION

28-Sep-18

01-Oct-18

3

0%

3

20-Jan-19

22-Jan-19

3

A4110

INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST

04-Oct-18

11-Oct-18

7

0%

5

25-Feb-19

02-Mar-19

0

A4120

INSTRUMENT EQUIPEMNT INSTALLATION

13-Oct-18

20-Oct-18

7

0%

20

24-Jan-19

16-Feb-19

4

A4130

INSTRUMENT CABLE LAYING

21-Oct-18

25-Oct-18

5

0%

18

12-Jan-19

31-Jan-19

4

A5310

INSTALLATION OF DELUGE

27-Oct-18

03-Nov-18

7

0%

8

12-Feb-19

20-Feb-19

3

A4130-1

SS TUBE AND LEAK TEST

0

0%

4

21-Feb-19

25-Feb-19

3

A4120-2

INSTALLATION OF INSTRUMENT VALVE

0

0%

5

19-Feb-19

24-Feb-19

0

A4120-1

FIELD INSTRUMENT INSTALLATION (GAUGES / TRANSMITTERS)

0

0%

18

30-Jan-19

19-Feb-19

4

A4120-11

CABLE GLANDING AND TERMINATION (ALONG JBs)

0

0%

6

31-Jan-19

06-Feb-19

3

A4120-21

CABLE GLANDING AND TERMINATION (ALONG INTSTRUMENTS)

0

0%

6

19-Feb-19

25-Feb-19

4

17

06-Feb-19

25-Feb-19

5

Painting & Fireproofing Firep

15-Sep-18

30-Sep-18

14

F M 1 2

A 3

M 4

29-Nov-18 2017 J Jul A 5 6 7

S 8

17:49

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 51 of 170

Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID

Activity Name

U3963- Critical Activities TF>5

Page 6 of11

BL1 Start

BL1 Finish

BL1 Duration

Phy. % Com.

OD

Act.Start / F-C Start

Act. Fin / F-C Fin

TF

A4390

STRUCTURAL STEEL PAINTING AND TOUCH-UP

15-Sep-18

22-Sep-18

7

0%

13

06-Feb-19

20-Feb-19

5

A4400

PIPING PAINTING AND TOUCH-UP

17-Sep-18

24-Sep-18

7

0%

13

06-Feb-19

20-Feb-19

5

A4410

FIREPROOFING FOR STRUCTURAL STEEL

23-Sep-18

30-Sep-18

7

0%

17

06-Feb-19

25-Feb-19

5

17-Sep-18 17-Sep-18

10-Nov-18 19-Sep-18

47 3

0%

11 3

13-Mar-19 13-Mar-19

25-Mar-19 16-Mar-19

0 0

29-Sep-18

01-Nov-18

30

0%

5

19-Mar-19

24-Mar-19

0

Pre-commisionin Pre-commisioning A3101 INST LOOP AND FUNCTIONAL TESTING A4700

ELECTRICAL LIGHITNG TEST

A4670

DELUGE SKID FUNCTIONAL TESTING

02-Oct-18

04-Oct-18

3

0%

5

19-Mar-19

24-Mar-19

0

A4680

LEAK TEST FOR SEPARATOR AND PIPING

04-Nov-18

06-Nov-18

3

0%

3

21-Mar-19

24-Mar-19

0

A4690

PUNCHLIST

07-Nov-18

10-Nov-18

3

0%

4

21-Mar-19

25-Mar-19

0

16-Nov-18

8 3

0%

11 0

25-Mar-19 25-Mar-19

06-Apr-19

START OF PRODUCTION

07-Nov-18 07-Nov-18

0 0

A5080

COMMISSIONING AND STARTUP

08-Nov-18

10-Nov-18

3

0%

4

26-Mar-19

30-Mar-19

0

A5090

PERFORMANCE TESTS

10-Nov-18

16-Nov-18

7

0%

6

31-Mar-19

06-Apr-19

0

18-Apr-18

26-Nov-18

191

178

05-Sep-18 A

20-May-19

0

18-Apr-18 18-Apr-18 18-Apr-18 18-Apr-18

14-Jun-18 17-May-18 03-May-18 03-May-18

50 26 14 14

50%

56 56 56 56

09-Sep-18 A 09-Sep-18 A 11-Sep-18 A 11-Sep-18 A

29-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18

4 4 4 4

METERING SKID SK F450 COMPLETE SS FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS

05-May-18 05-May-18

08-May-18 08-May-18

4 4

80%

56 56

09-Sep-18 A 09-Sep-18 A

29-Dec-18 29-Dec-18

4 4

PIPE SUPPORT F470 COMPLETE FAB. OF PIPESUPPORT STRUCTURE BY PETROSERV & TRANSFE

14-May-18 14-May-18

17-May-18 17-May-18

4 4

40%

48 48

12-Sep-18 A 12-Sep-18 A

19-Dec-18 19-Dec-18

4 4

01-May-18 01-May-18 01-May-18

14-Jun-18 14-Jun-18 27-May-18

39 39 23

0%

47 47 39

11-Oct-18 A 11-Oct-18 A 11-Oct-18 A

25-Dec-18 25-Dec-18 16-Dec-18

3 3 3

FBE PIPING BULK DELIVER AT SITE

29-May-18

14-Jun-18

15

0%

8

17-Dec-18

25-Dec-18

3

CABLE TRENCHES AND UTILITY ROAD CROSSINGS

09-May-18 27-Jun-18 27-Jun-18 27-Jun-18

18-Nov-18 18-Nov-18 18-Nov-18 21-Jul-18

166 124 124 21

35%

175 175 175 40

05-Sep-18 A 05-Sep-18 A 05-Sep-18 A 10-Sep-18 A

16-May-19 16-May-19 16-May-19 10-Dec-18

0 0 0 0

A2020

ROADS AND PAVING(INCLUDING MODIFICATIONS)

25-Oct-18

10-Nov-18

14

0%

14

04-Apr-19

20-Apr-19

0

A2040

DRAINAGE PIPE CULVERTS

25-Oct-18

10-Nov-18

14

0%

36

11-Dec-18

21-Jan-19

0

A2050

ROAD SAFETY CRASH BARRIERS AND BOLLARD

25-Oct-18

18-Nov-18

21

0%

13

18-Apr-19

02-May-19

0

A2080

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

07-Nov-18

10-Nov-18

3

0%

13

02-May-19

16-May-19

0

A1960-1

PROTECTION OF UNDERGROUND CABLES

0

90%

4

10-Sep-18 A

10-Dec-18

0

A1965-5

SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPLICAB

0

55%

40

05-Sep-18 A

10-Dec-18

0

20-Dec-18 31-Dec-18 31-Dec-18

02-Feb-19 20-Jan-19 20-Jan-19

4 4 4

Commissioning A5070

FAHS FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F440 COMPLETE FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/H

Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F510 PIPING FABRICATION & FBE COATING AT KUWAIT F540 INSTALLATION Civil Works COMMOMN A2030

Structural Steel METERING SKID SK A2610 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK WAY O

27-Sep-18 27-Sep-18 27-Sep-18

09-Oct-18 02-Oct-18 02-Oct-18

11 5 5

0%

38 18 18

PIPE SUPPORT A2630 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS OF

07-Oct-18 07-Oct-18

09-Oct-18 09-Oct-18

3 3

0%

28 28

20-Dec-18 20-Dec-18

21-Jan-19 21-Jan-19

4 4

0 0

0%

5 5

28-Jan-19 28-Jan-19

02-Feb-19 02-Feb-19

4 4

23-Dec-18 23-Dec-18 23-Dec-18

22-Apr-19 12-Feb-19 03-Feb-19

4 4 3

FIELD INSTRUMENT INSTRUM A2630-1 INSTALLATION OF INSTRUMENT STANCHION

0%

104 45 37

A3130

INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)

24-Sep-18

30-Sep-18

6

0%

5

29-Jan-19

03-Feb-19

4

A3140

HYDRO-TESTING, FLUSHING, DRAINING AND PURGING

01-Oct-18

03-Oct-18

3

0%

13

29-Jan-19

12-Feb-19

4

A3150

TIE-IN

04-Oct-18

11-Oct-18

7

0%

5

29-Jan-19

03-Feb-19

4

A3120-1

INSTALLATION OF BALL VALVE & GGC VALVE

0

0%

9

15-Jan-19

24-Jan-19

4

28-Feb-19 28-Feb-19

22-Apr-19 03-Mar-19

4 4

Piping PIPING -REMAINING -REMA A3120 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT

15-Sep-18 15-Sep-18 15-Sep-18

25-Oct-18 11-Oct-18 01-Oct-18

36 24 15

MOBILIZATION OF HOT TAPPING SUB CONTRACTOR

06-Oct-18 06-Oct-18

25-Oct-18 08-Oct-18

18 3

0%

46 3

HT1130

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

09-Oct-18

20-Oct-18

10

0%

9

03-Mar-19

12-Mar-19

4

HT1140

FLARE TIE-IN / NDT

21-Oct-18

23-Oct-18

3

0%

13

13-Mar-19

27-Mar-19

4

HT1150

HOT TIE-IN COMPLETE / REMOVE SCAFFOLD

24-Oct-18

25-Oct-18

2

0%

12

09-Apr-19

22-Apr-19

4

0 0

0%

21 1

30-Mar-19 30-Mar-19

22-Apr-19 30-Mar-19

4 4

0

0%

8

31-Mar-19

08-Apr-19

4

HOT TAPPING HT1120

Pre Shutdown and Plant Shutdown Tie-in A3150-000 MOBILIZATION OF OF TEAM APPLY PTW A3150-00

SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE

F M 1 2

A 3

M 4

29-Nov-18 2017 J Jul A 5 6 7

S 8

17:49

2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 52 of 170

PROJECT PLANNING PACKAGE

Attachment 3

JALEHA SHUTDOWN SCHEDULE

Page 53 of 170

TIE-IN SCHEDULE - (JALM) Activity ID

TIE-IN SCHEDULE - (JALM)

Activity Name

OD

Act. Fin / F-C Fin

Act.Start / F-C Start

537.00

20-Mar-19 08:00

14-Feb-19 17:00

537.00

20-Mar-19 08:00

14-Feb-19 17:00

250.00

02-Mar-19 09:00

14-Feb-19 17:00

20-Feb-19 17:00 14-Feb-19 17:00*

14-Feb-19 17:00

CO-ORDINATE LEVEL CHECK FOR PIPING SUPPORT & SPOOLS

96.00 0.00

THICKNESS / LAMINATION CHECK FOR TIE-IN POINTS

40.00

20-Feb-19 17:00

17-Feb-19 07:00

JM01-6"-P12134 JM01-6"-P12134-CS1-900-4 PSD (01 JOINT) SD-JL-34030 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP

50.00 2.00

23-Feb-19 21:00 20-Feb-19 19:00

20-Feb-19 17:00 20-Feb-19 17:00

TIE-IN SCHEDULE SCHED - (JALM) JALM - 19 TIE-IN PRE-SHUTDOWN TIE-IN - 07 TIE-IN COMMON SD-JL-10021 SD-JL-10001

SD-JL-34040

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

6.00

21-Feb-19 01:00

20-Feb-19 19:00

SD-JL-33960

FLUSHING & PURGING

6.00

21-Feb-19 07:00

21-Feb-19 01:00

SD-JL-33970

PIPE CUTTING AND INSPECTION BY QC

8.00

21-Feb-19 15:00

21-Feb-19 07:00

SD-JL-33980

FITUP, WELDING PIPING SPOOL & PWHT

20.00

22-Feb-19 11:00

21-Feb-19 15:00

SD-JL-33990

NDT - APPROVED

4.00

22-Feb-19 15:00

22-Feb-19 11:00

SD-JL-34050

VALVE INSTALLATION

10.00

23-Feb-19 05:00

22-Feb-19 15:00

SD-JL-34060

DE-BLINDING

6.00

23-Feb-19 15:00

23-Feb-19 05:00

SD-JL-34020

FINAL TOUCH UP AND QC INSPECTION

6.00

23-Feb-19 21:00

23-Feb-19 15:00

SD-JL-34110

HANDOVER TO OPERATION

0.00

23-Feb-19 21:00

57.00 2.00

25-Feb-19 03:00 21-Feb-19 15:00

21-Feb-19 13:00 21-Feb-19 13:00

JM02-31-0875-3" JM02-31-0875-3"-OD-CS1-300-4 PSD (02 JOINTS) SD-JL-34140 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34150

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

6.00

21-Feb-19 21:00

21-Feb-19 15:00

SD-JL-34070

FLUSHING & PURGING

6.00

22-Feb-19 03:00

21-Feb-19 21:00

SD-JL-34080

PIPE CUTTING AND INSPECTION BY QC

8.00

22-Feb-19 11:00

22-Feb-19 03:00

SD-JL-34090

FITUP, WELDING PIPING SPOOL & PWHT

20.00

23-Feb-19 07:00

22-Feb-19 11:00

SD-JL-34100

NDT - APPROVED

14.00

23-Feb-19 21:00

23-Feb-19 07:00

SD-JL-35960

VALVE INSTALLATION

10.00

24-Feb-19 11:00

23-Feb-19 21:00

SD-JL-35970

DE-BLINDING

6.00

24-Feb-19 21:00

24-Feb-19 11:00

SD-JL-35980

FINAL TOUCH UP AND QC INSPECTION

6.00

25-Feb-19 03:00

24-Feb-19 21:00

SD-JL-35990

HANDOVER TO OPERATION

0.00

25-Feb-19 03:00

58.00 2.00

25-Feb-19 23:00 22-Feb-19 11:00

22-Feb-19 09:00 22-Feb-19 09:00

JM02A-31-0330-3 JM02A-31-0330-3"-OD-L3-300-1 PSD (01 JOINT) SD-JL-34340 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34350

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

6.00

22-Feb-19 17:00

22-Feb-19 11:00

SD-JL-34270

FLUSHING & PURGING

6.00

22-Feb-19 23:00

22-Feb-19 17:00

SD-JL-34280

PIPE CUTTING AND INSPECTION BY QC

8.00

23-Feb-19 07:00

22-Feb-19 23:00

SD-JL-34290

FITUP, WELDING PIPING SPOOL & PWHT

20.00

24-Feb-19 03:00

23-Feb-19 07:00

SD-JL-34300

NDT - APPROVED

14.00

24-Feb-19 17:00

24-Feb-19 03:00

SD-JL-36000

VALVE INSTALLATION

10.00

25-Feb-19 09:00

24-Feb-19 17:00

SD-JL-36010

DE-BLINDING

6.00

25-Feb-19 17:00

25-Feb-19 09:00

SD-JL-36020

FINAL TOUCH UP AND QC INSPECTION

6.00

25-Feb-19 23:00

25-Feb-19 17:00

SD-JL-36030

HANDOVER TO OPERATION

0.00

25-Feb-19 23:00

49.00 2.00

26-Feb-19 10:00 23-Feb-19 11:00

23-Feb-19 09:00 23-Feb-19 09:00

5.00

23-Feb-19 16:00

23-Feb-19 11:00

JM16A-2"-A1101 JM16A-2"-A11016-CS1-150-4 PSD (THD JOINT) SD-JL-35640 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35650

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

SD-JL-35580

PIPE, CUTTING AND INSPECTION BY QC

6.00

24-Feb-19 03:00

23-Feb-19 21:00

SD-JL-35590

THREADED JOINT AND SEAL

22.00

25-Feb-19 01:00

24-Feb-19 03:00

SD-JL-35600

QC INSPECTION

3.00

25-Feb-19 04:00

25-Feb-19 01:00

SD-JL-36040

VALVE INSTALLATION

10.00

25-Feb-19 18:00

25-Feb-19 04:00

SD-JL-36060

FINAL TOUCH UP AND QC INSPECTION

6.00

26-Feb-19 10:00

26-Feb-19 04:00

SD-JL-36070

HANDOVER TO OPERATION

0.00

26-Feb-19 10:00

48.00 2.00

27-Feb-19 08:00 24-Feb-19 09:00

JM16B-2"-A1101 JM16B-2"-A11016-CS1-150-4 PSD (THD JOINT) SD-JL-35740 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP Remaining Work Critical Remaining Work Milestone

P3963-JMT

Feb 1

Mar 2

Apr 3

May 4

Page 1 of5 Jun 5

2017 Jul 6

Aug 7

Sep 8

Oct 9

Nov 10

Dec 11

29-Nov-18 Jan 12

Feb 13

Mar 14

Apr 15

May 16

Jun 17

2018 Jul 18

Aug 19

13:39 Sep 20

Oct 21

Nov 22

Dec 23

Jan 24

2019 Feb Mar 25 26

Apr 27

24-Feb-19 07:00 24-Feb-19 07:00

Page 1 of 5 CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

Date 29-Nov-18

Rev-D Revision Jaleha Shutdown Schedule for QP aprro

Checked

Approved

TIE-IN SCHEDULE - (JALM) TIE-IN SCHEDULE - (JALM)

Page 54 of 170

TIE-IN SCHEDULE - (JALM) Activity ID

Activity Name

TIE-IN SCHEDULE - (JALM) OD

Act. Fin / F-C Fin

Act.Start / F-C Start

SD-JL-35750

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

5.00

24-Feb-19 14:00

24-Feb-19 09:00

SD-JL-35680

PIPE CUTTING AND INSPECTION BY QC

6.00

25-Feb-19 01:00

24-Feb-19 19:00

SD-JL-35690

THREADED JOINT AND SEAL

22.00

25-Feb-19 23:00

25-Feb-19 01:00

SD-JL-35700

QC INSPECTION

3.00

26-Feb-19 02:00

25-Feb-19 23:00

SD-JL-36080

VALVE INSTALLATION

10.00

26-Feb-19 16:00

26-Feb-19 02:00

SD-JL-36100

FINAL TOUCH UP AND QC INSPECTION

6.00

27-Feb-19 08:00

27-Feb-19 02:00

SD-JL-36110

HANDOVER TO OPERATION

0.00

27-Feb-19 08:00

43.00 2.00

28-Feb-19 11:00 25-Feb-19 21:00

25-Feb-19 19:00 25-Feb-19 19:00

6.00

26-Feb-19 03:00

25-Feb-19 21:00

JM17A/B-6"-P121 JM17A/B-6"-P12134-CS1-900-4X PSD (SD VALVE REPLACEMENT) SD-JL-35840 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35850

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

SD-JL-35770

CABLE ISOLATION AND REMOVAL OF CABLE

6.00

26-Feb-19 09:00

26-Feb-19 03:00

SD-JL-35780

EXISTING VALVE REMOVAL

12.00

26-Feb-19 21:00

26-Feb-19 09:00

SD-JL-35790

VALVE INSTALLATION

18.00

27-Feb-19 15:00

26-Feb-19 21:00

SD-JL-35800

QC INSPECTION

6.00

27-Feb-19 21:00

27-Feb-19 15:00

SD-JL-36130

GLANDING AND TERMINATION OF CABLE

6.00

28-Feb-19 05:00

27-Feb-19 21:00

SD-JL-36140

LOOP TESTING

6.00

28-Feb-19 11:00

28-Feb-19 05:00

SD-JL-36150

HANDOVER TO OPERATION

0.00

28-Feb-19 11:00

50.00 2.00

02-Mar-19 09:00 27-Feb-19 07:00

27-Feb-19 05:00 27-Feb-19 05:00

JM18-6"-WF-31-0 JM18-6"-WF-31-0774-CS1-150-4 PSD (02 JOINTS) SD-JL-35940 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35950

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

6.00

27-Feb-19 13:00

27-Feb-19 07:00

SD-JL-35870

FLUSHING & PURGING

6.00

27-Feb-19 19:00

27-Feb-19 13:00

SD-JL-35880

PIPE CUTTING AND INSPECTION BY QC

8.00

28-Feb-19 03:00

27-Feb-19 19:00

SD-JL-35890

FITUP, WELDING PIPING SPOOL & PWHT

18.00

28-Feb-19 21:00

28-Feb-19 03:00

SD-JL-35900

NDT - APPROVED

6.00

01-Mar-19 03:00

28-Feb-19 21:00

SD-JL-36160

VALVE INSTALLATION

10.00

01-Mar-19 17:00

01-Mar-19 03:00

SD-JL-36170

DE-BLINDING

6.00

02-Mar-19 03:00

01-Mar-19 17:00

SD-JL-36180

FINAL TOUCH UP AND QC INSPECTION

6.00

02-Mar-19 09:00

02-Mar-19 03:00

SD-JL-36190

HANDOVER TO OPERATION

0.00

02-Mar-19 09:00

199.00

15-Mar-19 14:00

03-Mar-19 03:00

PLANT SHUTDOWN SHUTDOW SD-JL-10000 PLANT SHUTDOWN AND DE-CONTAMINATION

30.00 30.00

04-Mar-19 23:00 04-Mar-19 23:00

03-Mar-19 03:00 03-Mar-19 03:00

TIE-INS JM03-3"-WD-31-0244-CS1-900-8 (01 JOINT) JM03-3"-WD-31 SD-JL-34440 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP

164.00 43.00 2.00

15-Mar-19 14:00 08-Mar-19 01:00 05-Mar-19 08:00

05-Mar-19 06:00 05-Mar-19 06:00 05-Mar-19 06:00*

SHUTDOWN TIE-IN TIE - 12 TIE-IN

SD-JL-34450

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

8.00

05-Mar-19 16:00

05-Mar-19 08:00

SD-JL-34370

FLUSHING & PURGING

6.00

05-Mar-19 22:00

05-Mar-19 16:00

SD-JL-34380

PIPE CUTTING AND INSPECTION BY QC

10.00

06-Mar-19 08:00

05-Mar-19 22:00

SD-JL-34390

FITUP, WELDING PIPING SPOOL & PWHT

12.00

06-Mar-19 10:00

05-Mar-19 22:00

SD-JL-34400

NDT - APPROVED

6.00

06-Mar-19 16:00

06-Mar-19 10:00

SD-JL-36200

VALVE INSTALLATION

12.00

07-Mar-19 10:00

06-Mar-19 16:00

SD-JL-36210

DE-BLINDING

6.00

07-Mar-19 18:00

07-Mar-19 10:00

SD-JL-36220

FINAL TOUCH UP AND QC INSPECTION

6.00

08-Mar-19 00:00

07-Mar-19 18:00

SD-JL-36230

HANDOVER TO OPERATION

0.00

08-Mar-19 01:00

74.00 2.00

09-Mar-19 22:00 05-Mar-19 10:00

05-Mar-19 08:00 05-Mar-19 08:00

JM06A/B-16"-W JM06A/B-16"-WD-31-0636-L3-300-1 (02 JOINTS) SD-JL-34840 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34850

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

24.00

06-Mar-19 10:00

05-Mar-19 10:00

SD-JL-34770

FLUSHING & PURGING

10.00

06-Mar-19 20:00

06-Mar-19 10:00

SD-JL-34780

PIPE CUTTING AND INSPECTION BY QC

14.00

07-Mar-19 10:00

06-Mar-19 20:00

SD-JL-34790

FITUP, WELDING PIPING SPOOL & PWHT

18.00

08-Mar-19 04:00

07-Mar-19 10:00

SD-JL-34800

NDT - APPROVED

10.00

08-Mar-19 14:00

08-Mar-19 04:00

SD-JL-36280

VALVE INSTALLATION

10.00

09-Mar-19 04:00

08-Mar-19 14:00

SD-JL-36290

DE-BLINDING

8.00

09-Mar-19 16:00

09-Mar-19 04:00

SD-JL-36300

FINAL TOUCH UP AND QC INSPECTION

6.00

09-Mar-19 22:00

09-Mar-19 16:00

SD-JL-36310

HANDOVER TO OPERATION

0.00

09-Mar-19 22:00

66.00 2.00

11-Mar-19 16:00 07-Mar-19 16:00

07-Mar-19 14:00 07-Mar-19 14:00

12.00

08-Mar-19 04:00

07-Mar-19 16:00

JM12A-8"-GV-31 JM12A-8"-GV-31-1409-CS1-150-8 (01 JOINT) SD-JL-34240 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34250

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

Feb 1

Mar 2

Apr 3

May 4

Page 2 of5 Jun 5

2017 Jul 6

Aug 7

Sep 8

Oct 9

Nov 10

Dec 11

29-Nov-18 Jan 12

Feb 13

Mar 14

Apr 15

May 16

Jun 17

2018 Jul 18

Aug 19

13:39 Sep 20

Oct 21

Nov 22

Dec 23

Jan 24

2019 Feb Mar 25 26

Apr 27

Page 55 of 170

TIE-IN SCHEDULE - (JALM) Activity ID

Activity Name

TIE-IN SCHEDULE - (JALM) OD

Act. Fin / F-C Fin

Act.Start / F-C Start

SD-JL-34170

FLUSHING & PURGING

8.00

08-Mar-19 12:00

08-Mar-19 04:00

SD-JL-34180

PIPE CUTTING AND INSPECTION BY QC

16.00

09-Mar-19 04:00

08-Mar-19 12:00

SD-JL-34190

FITUP, WELDING PIPING SPOOL & PWHT

18.00

09-Mar-19 22:00

09-Mar-19 04:00

SD-JL-34200

NDT - APPROVED

8.00

10-Mar-19 06:00

09-Mar-19 22:00

SD-JL-36320

VALVE INSTALLATION

12.00

11-Mar-19 02:00

10-Mar-19 08:00

SD-JL-36330

DE-BLINDING

6.00

11-Mar-19 10:00

11-Mar-19 02:00

SD-JL-36340

FINAL TOUCH UP AND QC INSPECTION

6.00

11-Mar-19 16:00

11-Mar-19 10:00

SD-JL-36350

HANDOVER TO OPERATION

0.00

11-Mar-19 16:00

132.00 2.00

15-Mar-19 14:00 07-Mar-19 08:00

07-Mar-19 06:00 07-Mar-19 06:00

JM12B-30"-GV-3 JM12B-30"-GV-31-1400-CS1-150-8 (02 JOINTS) SD-JL-35440 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35450

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

34.00

08-Mar-19 18:00

07-Mar-19 08:00

SD-JL-35370

FLUSHING & PURGING

16.00

09-Mar-19 10:00

08-Mar-19 18:00

SD-JL-35380

PIPE CUTTING AND INSPECTION BY QC

36.00

10-Mar-19 22:00

09-Mar-19 10:00

SD-JL-35390

FITUP WELDING PIPING SPOOL & PWHT

48.00

12-Mar-19 22:00

10-Mar-19 22:00

SD-JL-35400

NDT - APPROVED

12.00

13-Mar-19 10:00

12-Mar-19 22:00

SD-JL-36360

VALVE INSTALLATION

18.00

14-Mar-19 12:00

13-Mar-19 10:00

SD-JL-36370

DE-BLINDING

12.00

15-Mar-19 06:00

14-Mar-19 14:00

SD-JL-36380

FINAL TOUCH UP AND QC INSPECTION

8.00

15-Mar-19 14:00

15-Mar-19 06:00

SD-JL-36390

HANDOVER TO OPERATION

JM04-3"-OC-31JM04-3"-OC-31-0266-CS1-900-8 (01 JOINT) SD-JL-34540 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP

0.00

15-Mar-19 14:00

47.00 2.00

08-Mar-19 05:00 05-Mar-19 08:00

05-Mar-19 06:00 05-Mar-19 06:00*

SD-JL-34550

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

8.00

05-Mar-19 16:00

05-Mar-19 08:00

SD-JL-34470

FLUSHING & PURGING

6.00

05-Mar-19 22:00

05-Mar-19 16:00

SD-JL-34480

PIPE CUTTING AND INSPECTION BY QC

10.00

06-Mar-19 08:00

05-Mar-19 22:00

SD-JL-34490

FITUP, WELDING PIPING SPOOL & PWHT

12.00

06-Mar-19 20:00

06-Mar-19 08:00

SD-JL-34500

NDT - APPROVED

3.00

06-Mar-19 23:00

06-Mar-19 20:00

SD-JL-36240

VALVE INSTALLATION

10.00

07-Mar-19 15:00

07-Mar-19 01:00

SD-JL-36250

DE-BLINDING

6.00

07-Mar-19 23:00

07-Mar-19 15:00

SD-JL-36260

FINAL TOUCH UP AND QC INSPECTION

6.00

08-Mar-19 05:00

07-Mar-19 23:00

SD-JL-36270

HANDOVER TO OPERATION

0.00

08-Mar-19 05:00

50.00 2.00

09-Mar-19 18:00 06-Mar-19 18:00

06-Mar-19 16:00 06-Mar-19 16:00

10.00

07-Mar-19 04:00

06-Mar-19 18:00

JM05A-4"-P1102 JM05A-4"-P11021-CS1-300-4 (01 JOINT) SD-JL-34640 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34650

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

SD-JL-34570

FLUSHING & PURGING

6.00

07-Mar-19 10:00

07-Mar-19 04:00

SD-JL-34580

PIPE CUTTING AND INSPECTION BY QC

10.00

07-Mar-19 20:00

07-Mar-19 10:00

SD-JL-34590

FITUP, WELDING PIPING SPOOL & PWHT

12.00

08-Mar-19 08:00

07-Mar-19 20:00

SD-JL-34600

NDT - APPROVED

4.00

08-Mar-19 12:00

08-Mar-19 08:00

SD-JL-36560

VALVE INSTALLATION

10.00

09-Mar-19 04:00

08-Mar-19 14:00

SD-JL-36570

DE-BLINDING

6.00

09-Mar-19 12:00

09-Mar-19 04:00

SD-JL-36580

FINAL TOUCH UP AND QC INSPECTION

6.00

09-Mar-19 18:00

09-Mar-19 12:00

SD-JL-36590

HANDOVER TO OPERATION

0.00

09-Mar-19 18:00

66.00 2.00

11-Mar-19 22:00 07-Mar-19 20:00

07-Mar-19 18:00 07-Mar-19 18:00

JM05B-16"-OC-3 JM05B-16"-OC-31-0218-CS1-300-4 (02 JOINTS) SD-JL-34740 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34750

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

14.00

08-Mar-19 10:00

07-Mar-19 20:00

SD-JL-34670

FLUSHING & PURGING

10.00

08-Mar-19 20:00

08-Mar-19 10:00

SD-JL-34680

PIPE CUTTING AND INSPECTION BY QC

12.00

09-Mar-19 08:00

08-Mar-19 20:00

SD-JL-34690

FITUP, WELDING PIPING SPOOL & PWHT

18.00

10-Mar-19 02:00

09-Mar-19 08:00

SD-JL-34700

NDT - APPROVED

8.00

10-Mar-19 10:00

10-Mar-19 02:00

SD-JL-36600

VALVE INSTALLATION

14.00

11-Mar-19 06:00

10-Mar-19 10:00

SD-JL-36610

DE-BLINDING

6.00

11-Mar-19 16:00

11-Mar-19 08:00

SD-JL-36620

FINAL TOUCH UP AND QC INSPECTION

6.00

11-Mar-19 22:00

11-Mar-19 16:00

SD-JL-36630

HANDOVER TO OPERATION

JM13-14"-GP-31 JM13-14"-GP-31-9008-CS1-300-4 (02 JOINTS) SD-JL-35540 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP

0.00

11-Mar-19 22:00

60.00 2.00

13-Mar-19 12:00 09-Mar-19 20:00

09-Mar-19 18:00 09-Mar-19 18:00

SD-JL-35550

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

10.00

10-Mar-19 06:00

09-Mar-19 20:00

SD-JL-35470

FLUSHING & PURGING

8.00

10-Mar-19 14:00

10-Mar-19 06:00

Feb 1

Mar 2

Apr 3

May 4

Page 3 of5 Jun 5

2017 Jul 6

Aug 7

Sep 8

Oct 9

Nov 10

Dec 11

29-Nov-18 Jan 12

Feb 13

Mar 14

Apr 15

May 16

Jun 17

2018 Jul 18

Aug 19

13:39 Sep 20

Oct 21

Nov 22

Dec 23

Jan 24

2019 Feb Mar 25 26

Apr 27

Page 56 of 170

TIE-IN SCHEDULE - (JALM) Activity ID

Activity Name

TIE-IN SCHEDULE - (JALM) OD

Act. Fin / F-C Fin

Act.Start / F-C Start

SD-JL-35480

PIPE CUTTING AND INSPECTION BY QC

12.00

11-Mar-19 02:00

10-Mar-19 14:00

SD-JL-35490

FITUP, WELDING PIPING SPOOL & PWHT

18.00

11-Mar-19 20:00

11-Mar-19 02:00

SD-JL-35500

NDT - APPROVED

8.00

12-Mar-19 04:00

11-Mar-19 20:00

SD-JL-36640

VALVE INSTALLATION

12.00

12-Mar-19 22:00

12-Mar-19 04:00

SD-JL-36650

DE-BLINDING

6.00

13-Mar-19 06:00

12-Mar-19 22:00

SD-JL-36660

FINAL TOUCH UP AND QC INSPECTION

6.00

13-Mar-19 12:00

13-Mar-19 06:00

SD-JL-36670

HANDOVER TO OPERATION

0.00

13-Mar-19 12:00

43.00 2.00

08-Mar-19 01:00 05-Mar-19 08:00

05-Mar-19 06:00 05-Mar-19 06:00

JM07-3"-WD-31 JM07-3"-WD-31-0699-L3-300-1 (FLANGED CONNECTION) SD-JL-34940 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34950

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

6.00

05-Mar-19 14:00

05-Mar-19 08:00

SD-JL-34870

FLUSHING & PURGING

6.00

05-Mar-19 20:00

05-Mar-19 14:00

SD-JL-34880

UNBOLTING, REMOVAL OF EXISTING JOINT AND INSPECTION BY QC

8.00

06-Mar-19 04:00

05-Mar-19 20:00

SD-JL-34890

INSTALLATION OF NEW BOLT JOINT

12.00

06-Mar-19 16:00

06-Mar-19 04:00

SD-JL-34900

LEAKAGE INSPECTION

3.00

06-Mar-19 19:00

06-Mar-19 16:00

SD-JL-36400

VALVE INSTALLATION

10.00

07-Mar-19 10:00

06-Mar-19 20:00

SD-JL-36410

DE-BLINDING

6.00

07-Mar-19 18:00

07-Mar-19 10:00

SD-JL-36420

FINAL TOUCH UP AND QC INSPECTION

6.00

08-Mar-19 00:00

07-Mar-19 18:00

SD-JL-36430

HANDOVER TO OPERATION

0.00

08-Mar-19 01:00

44.00 2.00

09-Mar-19 12:00 06-Mar-19 20:00

06-Mar-19 18:00 06-Mar-19 18:00

JM09A-4"-GL-31 JM09A-4"-GL-31-9017-CS1-150-8 (01 JOINT) SD-JL-35140 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35150

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

6.00

07-Mar-19 02:00

06-Mar-19 20:00

SD-JL-35070

FLUSHING & PURGING

6.00

07-Mar-19 08:00

07-Mar-19 02:00

SD-JL-35080

PIPE CUTTING AND INSPECTION BY QC

8.00

07-Mar-19 16:00

07-Mar-19 08:00

SD-JL-35090

FITUP, WELDING PIPING SPOOL & PWHT

12.00

08-Mar-19 04:00

07-Mar-19 16:00

SD-JL-35100

NDT - APPROVED

4.00

08-Mar-19 08:00

08-Mar-19 04:00

SD-JL-36440

VALVE INSTALLATION

10.00

08-Mar-19 22:00

08-Mar-19 08:00

SD-JL-36450

DE-BLINDING

6.00

09-Mar-19 06:00

08-Mar-19 22:00

SD-JL-36460

FINAL TOUCH UP AND QC INSPECTION

6.00

09-Mar-19 12:00

09-Mar-19 06:00

SD-JL-36470

HANDOVER TO OPERATION

JM09B-16"-GL-3 JM09B-16"-GL-31-9015-CS1-150-8 (02 JOINTS) SD-JL-35240 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP

0.00

09-Mar-19 12:00

70.00 2.00

11-Mar-19 18:00 07-Mar-19 12:00

07-Mar-19 10:00 07-Mar-19 10:00

SD-JL-35250

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

12.00

08-Mar-19 00:00

07-Mar-19 12:00

SD-JL-35170

FLUSHING & PURGING

10.00

08-Mar-19 10:00

08-Mar-19 00:00

SD-JL-35180

PIEP CUTTING AND INSPECTION BY QC

18.00

09-Mar-19 04:00

08-Mar-19 10:00

SD-JL-35190

FITUP, WELDING PIPING SPOOL & PWHT

18.00

09-Mar-19 22:00

09-Mar-19 04:00

SD-JL-35200

NDT - APPROVED

8.00

10-Mar-19 06:00

09-Mar-19 22:00

SD-JL-36480

VALVE INSTALLATION

12.00

11-Mar-19 02:00

10-Mar-19 08:00

SD-JL-36490

DE-BLINDING

8.00

11-Mar-19 12:00

11-Mar-19 02:00

SD-JL-36500

FINAL TOUCH UP AND QC INSPECTION

6.00

11-Mar-19 18:00

11-Mar-19 12:00

SD-JL-36510

HANDOVER TO OPERATION

0.00

11-Mar-19 18:00

44.00 2.00

12-Mar-19 16:00 10-Mar-19 00:00

09-Mar-19 22:00 09-Mar-19 22:00

6.00

10-Mar-19 06:00

10-Mar-19 00:00

JM10-1"-D11042 JM10-1"-D11042-CS1-300-4 (01 JOINT) SD-JL-35340 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35350

APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION

SD-JL-35270

FLUSHING & PURGING

6.00

10-Mar-19 12:00

10-Mar-19 06:00

SD-JL-35280

PIPE CUTTING AND INSPECTION BY QC

10.00

10-Mar-19 22:00

10-Mar-19 12:00

SD-JL-35290

FITUP, WELDING PIPING SPOOL & PWHT

12.00

11-Mar-19 10:00

10-Mar-19 22:00

SD-JL-35300

NDT - APPROVED

6.00

11-Mar-19 16:00

11-Mar-19 10:00

SD-JL-36520

VALVE INSTALLATION

8.00

12-Mar-19 04:00

11-Mar-19 16:00

SD-JL-36530

DE-BLINDING

6.00

12-Mar-19 12:00

12-Mar-19 04:00

SD-JL-36540

FINAL TOUCH UP AND QC INSPECTION

4.00

12-Mar-19 16:00

12-Mar-19 12:00

SD-JL-36550

HANDOVER TO OPERATION

0.00

12-Mar-19 16:00

0.00

20-Mar-19 08:00

20-Mar-19 08:00

0.00 0.00

20-Mar-19 08:00

20-Mar-19 08:00 20-Mar-19 08:00*

124.00

14-Mar-19 02:00

06-Mar-19 08:00

18.00 2.00

07-Mar-19 10:00 06-Mar-19 10:00

06-Mar-19 08:00 06-Mar-19 08:00*

POST-SHUTDOWN POST-SHUTDOW LEAK TEST SD-JL-2000

LEAK TEST (JOINTLY WITH QP OPERATION)

SYSTEM MODIFICATIONS MODIFI ESD / DCS MARSHALLING MARS CABINET JM-MOD-001 ISOLATE 24V DC DISTRIBUTION

Feb 1

Mar 2

Apr 3

May 4

Page 4 of5 Jun 5

2017 Jul 6

Aug 7

Sep 8

Oct 9

Nov 10

Dec 11

29-Nov-18 Jan 12

Feb 13

Mar 14

Apr 15

May 16

Jun 17

2018 Jul 18

Aug 19

13:39 Sep 20

Oct 21

Nov 22

Dec 23

Jan 24

2019 Feb Mar 25 26

Apr 27

Page 57 of 170

TIE-IN SCHEDULE - (JALM) Activity ID

Activity Name

TIE-IN SCHEDULE - (JALM) OD

Act. Fin / F-C Fin

Act.Start / F-C Start

JM-MOD-002

INSTALLATION OF FF CARD AND BARRIOR FOR AI SIGNAL

4.00

06-Mar-19 16:00

06-Mar-19 10:00

JM-MOD-003

INSTALL AI, DI, DO CARDS

4.00

06-Mar-19 22:00

06-Mar-19 16:00

JM-MOD-004

INTERNAL WIRING FOR COMPONENTS

6.00

07-Mar-19 06:00

06-Mar-19 22:00

JM-MOD-005

CONTINUITY CHECK FOR NEW WIRING

2.00

07-Mar-19 10:00

07-Mar-19 08:00

18.00 2.00

08-Mar-19 12:00 07-Mar-19 12:00

07-Mar-19 10:00 07-Mar-19 10:00

F&G MARSHALLING MARSHALLI CABINET JM-MOD-006 ISOLATE 24V DC DISTRIBUTION JM-MOD-007

INSTAL FF CARD AND BARRIOR FOR AI SIGNAL

4.00

07-Mar-19 18:00

07-Mar-19 14:00

JM-MOD-008

INSTALL AI, DI, DO CARDS

4.00

08-Mar-19 02:00

07-Mar-19 20:00

JM-MOD-009

INTERNAL WIRING FOR COMPONENTS

6.00

08-Mar-19 10:00

08-Mar-19 02:00

JM-MOD-010

CONTINUITY CHECK FOR NEW WIRING

2.00

08-Mar-19 12:00

08-Mar-19 10:00

20.00 2.00

09-Mar-19 04:00 08-Mar-19 02:00

07-Mar-19 22:00 07-Mar-19 22:00

ESD / DCS AUX CONSOLE C JM-MOD-011 HOLE PROVISION FOR NEW ESD PUSH BUTTON JM-MOD-012

INSTALLATION OF NEW BUTTON AND MAINTENANCE OVERRIDE

4.00

08-Mar-19 06:00

08-Mar-19 02:00

JM-MOD-013

INSTALLATION OF NEW TB

4.00

08-Mar-19 12:00

08-Mar-19 08:00

JM-MOD-014

INTERNAL WIRING FROM NEW SWITCH TO NEW TB

8.00

09-Mar-19 02:00

08-Mar-19 14:00

JM-MOD-015

CONTINUITY TEST

F&G AUX CONSOLE CONSO JM-MOD-016 HOLE PROVISION FOR NEW ESD PUSH BUTTON

2.00

09-Mar-19 04:00

09-Mar-19 02:00

18.00 2.00

10-Mar-19 06:00 09-Mar-19 06:00

09-Mar-19 04:00 09-Mar-19 04:00

JM-MOD-017

INSTALLATION OF NEW BUTTON AND MAINTENANCE OVERRIDE

4.00

09-Mar-19 12:00

09-Mar-19 08:00

JM-MOD-018

INSTALLATION OF NEW TB

4.00

09-Mar-19 18:00

09-Mar-19 14:00

JM-MOD-019

INTERNAL WIRING FROM NEW SWITCH TO NEW TB

6.00

10-Mar-19 04:00

09-Mar-19 20:00

JM-MOD-020

CONTINUITY TEST

2.00

10-Mar-19 06:00

10-Mar-19 04:00

SOFTWARE MODIFICATION MOD JM-MOD-021 SOFTWARE MODIFICATION FOR DCS / ESD / F&G

24.00 24.00

11-Mar-19 18:00 11-Mar-19 18:00

10-Mar-19 08:00 10-Mar-19 08:00

PUNCHLIST JM-MOD-022

36.00 36.00

14-Mar-19 02:00 14-Mar-19 02:00

11-Mar-19 20:00 11-Mar-19 20:00

FINAL CHECK AND PUNCH LIST

Feb 1

Mar 2

Apr 3

May 4

Page 5 of5 Jun 5

2017 Jul 6

Aug 7

Sep 8

Oct 9

Nov 10

Dec 11

29-Nov-18 Jan 12

Feb 13

Mar 14

Apr 15

May 16

Jun 17

2018 Jul 18

Aug 19

13:39 Sep 20

Oct 21

Nov 22

Dec 23

Jan 24

2019 Feb Mar 25 26

Apr 27

Page 58 of 170

PROJECT PLANNING PACKAGE

Attachment 4

PROGRESS TABLE – WEIGHTAGE FACTOR LEV - II

Page 59 of 170

"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" PROJECT No. 3963

REV-D

JOB TITLE : "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" CLIENT

: QATAR PETROLEUM

25-Oct-18

BASELINE PLAN

REVISED PLAN

OVERALL PROJECT PREVIOUS WEEK

S. No.

DESCRIPTION

CURRENT WEEK

UP TO DATE

PREVIOUS WEEK

CURRENT WEEK

UP TO DATE

REL. WT. %

PLANNED

ACTUAL

DEV.

PLANNED

ACTUAL

DEV.

PLANNED

ACTUAL

DEV.

PLANNED

ACTUAL

DEV.

PLANNED

ACTUAL

DEV.

PLANNED

ACTUAL

DEV.

1

ENGINEERING PHASE

3.98%

95.00%

94.64%

-0.36%

0.00%

0.00%

0.00%

95.00%

94.64%

-0.36%

94.64%

94.64%

0.00%

0.00%

0.00%

0.00%

94.64%

94.64%

0.00%

2

PROCUREMENT PHASE

65.02%

100.00%

89.55%

-10.45%

0.00%

0.00%

0.00%

100.00%

89.55%

-10.45%

89.55%

89.55%

0.00%

0.00%

0.00%

0.00%

89.55%

89.55%

0.00%

3

CONSTRUCTION PHASE

21.00%

82.78%

24.94%

-57.84%

3.79%

0.02%

-3.78%

86.57%

24.96%

-61.61%

24.94%

24.94%

0.00%

0.02%

0.02%

0.00%

24.96%

24.96%

0.00%

4

PRECOMMISSIONING & COMMISSIONING

8.00%

30.87%

0.21%

-30.66%

6.35%

0.09%

-6.26%

37.22%

0.30%

-36.92%

0.21%

0.21%

0.00%

0.09%

0.09%

0.00%

0.30%

0.30%

0.00%

5

CLOSE-OUT DOCUMENTS

2.00%

2.70%

0.00%

-2.70%

1.89%

0.00%

-1.89%

4.59%

0.00%

-4.59%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100.00%

88.71%

67.24%

-21.46%

1.34%

0.01%

-1.33%

90.05%

67.26%

-22.80%

67.24%

67.24%

0.00%

0.01%

0.01%

0.00%

67.26%

67.26%

0.00%

Overall Project

Page 60 of 170

PROJECT PLANNING PACKAGE

Attachment 5

S-CURVES

Page 61 of 170

QATAR BRANCH 0.19% 0.05% 0.59% 0.21% 2.28% 2.76% 2.04% 1.05% 1.34% 2.84% 0.11% 0.69% 1.96% 2.61% 1.76% 0.38% 0.00% 0.59% 0.49% 0.52% 4.03% 1.27% 4.40% 1.91% 1.73% 2.92% 0.19% 0.19% 0.01%

28.31% 28.36% 28.95% 29.16% 31.44% 34.21% 36.25% 37.30% 38.64% 41.47% 41.58% 42.28% 44.23% 46.85% 48.61% 48.99% 48.99% 49.58% 50.07% 50.59% 54.63% 55.89% 60.30% 62.21% 63.94% 66.87% 67.06% 67.24% 67.26%

0.14%

11.93%

0.16%

0.32%

11.79%

28.13%

0.08%

11.47%

0.69%

0.89%

11.40%

27.97%

1.23%

0.31%

0.10%

9.28% 10.51%

0.28%

0.11%

9.18%

27.28%

0.10%

9.07%

Overall Project Progress S-Curve

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION DATE:

1.03% 0.50% 0.87% 0.24% 0.26% 0.24% 0.27% 0.25% 0.23% 0.23% 0.23% 0.39%

97.65% 97.90% 98.16% 98.40% 98.67% 98.92% 99.16% 99.38% 99.61% 100.00%

0.53%

94.62%

96.78%

0.32%

94.09%

96.28%

0.37%

93.77%

0.63%

0.61%

93.40%

95.25%

0.61%

92.79%

2.10%

88.22%

0.59%

1.55%

86.12%

0.43%

2.23%

84.57%

92.19%

2.21%

82.34%

91.59%

2.37%

80.13%

0.42%

1.46%

77.76%

91.16%

1.26%

76.29%

0.66%

3.63%

75.03%

90.74%

0.94%

71.41%

0.62%

1.32%

70.47%

0.69%

0.60%

69.14%

90.07%

0.57%

68.55%

89.46%

0.50%

67.98%

0.54%

0.23%

67.48%

88.76%

0.01%

0.19%

0.19%

2.92%

1.73%

1.91%

4.40%

67.26%

67.24%

67.06%

66.87%

63.94%

62.21%

60.30%

67.26%

67.24%

67.06%

66.87%

63.94%

62.21%

60.30%

0.01%

0.19%

0.19%

2.92%

1.73%

1.91%

4.40%

1.27%

"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 " 25-Oct-18

Page 62 of 170

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.10%

0.18%

0.18%

0.18%

0.17%

0.16%

0.16%

0.16%

0.18%

0.44%

0.88%

0.75%

1.15%

1.31%

1.23%

1.53%

1.19%

1.34%

1.17%

1.34%

1.32%

0.87%

1.07%

0.98%

0.54%

27-Sep-18 4-Oct-18 11-Oct-18 18-Oct-18 25-Oct-18 1-Nov-18 8-Nov-18 15-Nov-18 22-Nov-18 29-Nov-18 6-Dec-18 13-Dec-18 20-Dec-18 27-Dec-18 3-Jan-19 10-Jan-19 17-Jan-19

76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126

25-Jul-19

18-Jul-19

11-Jul-19

4-Jul-19

27-Jun-19

20-Jun-19

13-Jun-19

6-Jun-19

30-May-19

23-May-19

16-May-19

9-May-19

2-May-19

25-Apr-19

18-Apr-19

11-Apr-19

4-Apr-19

28-Mar-19

21-Mar-19

14-Mar-19

7-Mar-19

28-Feb-19

21-Feb-19

14-Feb-19

7-Feb-19

31-Jan-19

24-Jan-19

20-Sep-18

2-Aug-18

13-Sep-18

26-Jul-18

6-Sep-18

19-Jul-18

25‐Jul‐19

18‐Jul‐19

11‐Jul‐19

4‐Jul‐19

27‐Jun‐19

20‐Jun‐19

13‐Jun‐19

6‐Jun‐19

30‐May‐19

23‐May‐19

16‐May‐19

9‐May‐19

2‐May‐19

25‐Apr‐19

18‐Apr‐19

11‐Apr‐19

4‐Apr‐19

28‐Mar‐19

21‐Mar‐19

14‐Mar‐19

7‐Mar‐19

28‐Feb‐19

21‐Feb‐19

14‐Feb‐19

7‐Feb‐19

31‐Jan‐19

24‐Jan‐19

17‐Jan‐19

10‐Jan‐19

3‐Jan‐19

27‐Dec‐18

20‐Dec‐18

13‐Dec‐18

6‐Dec‐18

29‐Nov‐18

22‐Nov‐18

15‐Nov‐18

8‐Nov‐18

1‐Nov‐18

25‐Oct‐18

18‐Oct‐18

11‐Oct‐18

4‐Oct‐18

27‐Sep‐18

20‐Sep‐18

13‐Sep‐18

6‐Sep‐18

30‐Aug‐18

23‐Aug‐18

16‐Aug‐18

9‐Aug‐18

2‐Aug‐18

26‐Jul‐18

19‐Jul‐18

12‐Jul‐18

5‐Jul‐18

28‐Jun‐18

21‐Jun‐18

14‐Jun‐18

7‐Jun‐18

31‐May‐18

24‐May‐18

17‐May‐18

10‐May‐18

3‐May‐18

26‐Apr‐18

19‐Apr‐18

12‐Apr‐18

5‐Apr‐18

29‐Mar‐18

22‐Mar‐18

15‐Mar‐18

8‐Mar‐18

1‐Mar‐18

22‐Feb‐18

15‐Feb‐18

8‐Feb‐18

1‐Feb‐18

25‐Jan‐18

18‐Jan‐18

11‐Jan‐18

4‐Jan‐18

28‐Dec‐17

21‐Dec‐17

14‐Dec‐17

7‐Dec‐17

30‐Nov‐17

23‐Nov‐17

16‐Nov‐17

9‐Nov‐17

2‐Nov‐17

26‐Oct‐17

19‐Oct‐17

12‐Oct‐17

5‐Oct‐17

28‐Sep‐17

21‐Sep‐17

14‐Sep‐17

7‐Sep‐17

31‐Aug‐17

24‐Aug‐17

17‐Aug‐17

10‐Aug‐17

3‐Aug‐17

27‐Jul‐17

20‐Jul‐17

13‐Jul‐17

6‐Jul‐17

29‐Jun‐17

22‐Jun‐17

15‐Jun‐17

8‐Jun‐17

1‐Jun‐17

25‐May‐17

18‐May‐17

11‐May‐17

4‐May‐17

27‐Apr‐17

20‐Apr‐17

13‐Apr‐17

70.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

99.90%

99.72%

99.55%

99.37%

99.19%

99.03%

98.87%

98.70%

98.53%

98.08%

97.20%

96.45%

95.30%

94.00%

92.77%

91.24%

90.05%

88.71%

87.54%

86.20%

84.88%

84.02%

82.95%

81.97%

12-Jul-18

75

55.89%

5-Jul-18

74

1.27%

28-Jun-18

73

55.89%

21-Jun-18

72

30-Aug-18

14-Jun-18

71 0.42%

7-Jun-18

70

81.43%

31-May-18

69

4.03%

24-May-18

68

54.63%

17-May-18

67

4.03%

10-May-18

66

54.63%

3-May-18

65

23-Aug-18

26-Apr-18

64 0.65%

19-Apr-18

63

81.02%

12-Apr-18

62

0.52%

5-Apr-18

61

50.59%

29-Mar-18

60

0.52%

22-Mar-18

59

50.59%

15-Mar-18

58

9-Aug-18

8-Mar-18

57

16-Aug-18

1-Mar-18

56 0.36%

22-Feb-18

55 0.35%

15-Feb-18

54

80.37%

8-Feb-18

53

80.01%

1-Feb-18

52

0.49%

25-Jan-18

51

0.59%

18-Jan-18

50

50.07%

1.58%

1.66%

0.46%

1.27%

2.21%

0.54%

0.39%

0.28%

0.33%

0.37%

0.37%

0.39%

4.33%

2.21%

0.26%

3.15%

2.43%

4.34%

3.06%

0.45%

2.27%

1.19%

2.25%

1.01%

0.82%

2.32%

0.83%

2.50%

0.45%

49

49.58%

79.65%

78.07%

76.41%

75.94%

74.68%

72.47%

71.93%

71.54%

71.26%

70.94%

70.56%

70.20%

69.81%

65.48%

63.27%

63.01%

59.87%

57.44%

53.10%

50.04%

49.60%

47.32%

46.13%

43.88%

42.87%

42.05%

39.73%

38.89%

36.40%

48

0.49%

0.00%

0.38%

1.76%

2.61%

1.96%

0.69%

0.11%

2.84%

1.34%

1.05%

2.04%

2.76%

2.28%

0.21%

0.59%

0.05%

0.19%

0.16%

0.69%

0.31%

0.28%

3.18%

0.10%

0.55%

0.49%

0.51%

0.78%

0.23%

2.56%

28-Dec-17

47

0.59%

48.99%

48.99%

48.61%

46.85%

44.23%

42.28%

41.58%

41.47%

38.64%

37.30%

36.25%

34.21%

31.44%

29.16%

28.95%

28.36%

28.31%

28.13%

27.97%

27.28%

26.97%

26.69%

23.51%

23.41%

22.86%

22.37%

21.86%

21.08%

20.85%

21-Dec-17

46

50.07%

0.00%

0.38%

1.76%

2.61%

1.96%

0.69%

0.11%

2.84%

1.34%

1.05%

2.04%

2.76%

2.28%

0.21%

0.59%

0.05%

0.19%

0.16%

0.69%

0.31%

0.28%

3.18%

0.10%

0.55%

0.49%

0.51%

0.78%

0.23%

2.56%

14-Dec-17

45

49.58%

48.99%

48.99%

48.61%

46.85%

44.23%

42.28%

41.58%

41.47%

38.64%

37.30%

36.25%

34.21%

31.44%

29.16%

28.95%

28.36%

28.31%

28.13%

27.97%

27.28%

26.97%

26.69%

23.51%

23.41%

22.86%

22.37%

21.86%

21.08%

20.85%

7-Dec-17

4-Jan-18

30-Nov-17

44

11-Jan-18

23-Nov-17

43 2.39%

16-Nov-17

42 0.95%

9-Nov-17

41

35.94%

2-Nov-17

40

33.55%

26-Oct-17

39

1.50%

19-Oct-17

38

0.58%

5-Oct-17 12-Oct-17

28-Sep-17

37

18.29%

1.38%

1.28%

1.19%

3.28%

1.33%

0.27%

2.13%

0.48%

0.29%

2.92%

0.53%

1.43%

0.89%

0.54%

21-Sep-17

36

16.78%

32.60%

31.22%

29.94%

28.75%

25.47%

24.14%

23.87%

21.74%

21.26%

20.97%

18.05%

17.52%

16.09%

15.20%

0.38%

7-Sep-17 14-Sep-17

35

1.50%

1.77%

2.00%

0.21%

0.06%

0.23%

0.14%

0.32%

0.08%

0.89%

1.23%

0.10%

0.11%

0.10%

0.22%

14.66%

1.70%

0.98%

34

0.58%

16.21%

14.44%

12.43%

12.22%

12.16%

11.93%

11.79%

11.47%

11.40%

10.51%

9.28%

9.18%

9.07%

8.97%

0.19%

14.28%

12.58%

31-Aug-17

33

18.29%

1.77%

2.00%

0.21%

0.06%

0.23%

0.14%

0.32%

0.08%

0.89%

1.23%

0.10%

0.11%

0.10%

0.22%

8.75%

0.49%

0.21%

0.72%

24-Aug-17

32

16.78%

16.21%

14.44%

12.43%

12.22%

12.16%

11.93%

11.79%

11.47%

11.40%

10.51%

9.07%

8.97%

0.19%

8.56%

8.07%

11.60%

0.52%

17-Aug-17

31

26.97%

0.22%

8.97%

8.75%

0.49%

0.21%

0.05%

10.87%

0.50%

3-Aug-17 10-Aug-17

30

3.18%

0.19%

8.75%

8.56%

8.07%

7.86%

0.23%

10.35%

1.87%

0.25%

27-Jul-17

29

26.69%

0.49%

8.56%

0.05%

7.81%

0.36%

9.85%

7.98%

20-Jul-17

28

0.10%

0.21%

8.07%

7.86%

0.23%

7.58%

0.95%

2.15%

0.20%

13-Jul-17

27

23.510%

0.05%

7.86%

7.81%

0.36%

7.22%

6.27%

7.73%

1.42%

6-Jul-17

26

0.55%

0.23%

7.81%

7.58%

0.95%

2.15%

1.04%

7.53%

0.43%

29-Jun-17

25

0.49%

0.36%

7.58%

7.22%

6.27%

4.12%

0.22%

6.12%

0.30%

22-Jun-17

24

23.41%

0.95%

7.22%

1.04%

3.08%

0.16%

5.69%

1.57%

0.10%

15-Jun-17

23

22.86%

2.15%

6.27%

4.12%

0.22%

2.86%

0.17%

5.39%

3.82%

8-Jun-17

22

0.51%

1.04%

4.12%

3.08%

0.16%

2.70%

0.02%

0.63%

1.30%

1-Jun-17

21

0.78%

0.22%

3.08%

2.86%

0.17%

2.53%

2.51%

3.71%

0.18%

25-May-17

20

22.37%

0.16%

2.86%

2.70%

0.02%

0.63%

0.52%

2.42%

0.59%

0.09%

18-May-17

19

21.86%

0.17%

2.70%

2.53%

2.51%

1.89%

0.10%

2.24%

1.65%

11-May-17

18

0.23%

0.02%

2.53%

0.52%

1.37%

0.52%

0.08%

1.01%

4-May-17

17

2.56%

0.63%

2.51%

1.89%

0.10%

1.27%

0.75%

1.56%

0.16%

27-Apr-17

16

21.08%

0.52%

1.89%

1.37%

0.52%

0.08%

0.07%

0.55%

0.09%

0.02%

15

20.85%

0.10%

1.37%

1.27%

0.75%

0.67%

0.15%

0.39%

0.30%

20-Apr-17

14

6‐Apr‐17

13-Apr-17

13

1.50%

0.52%

1.27%

0.07%

0.60%

0.27%

0.05%

0.10%

30‐Mar‐17

6-Apr-17

12

0.58%

0.08%

0.75%

0.67%

0.15%

0.45%

0.19%

0.28%

0.03%

23‐Mar‐17

30-Mar-17

11

18.29%

0.07%

0.67%

0.60%

0.27%

0.05%

0.02%

0.19%

0.11%

16‐Mar‐17

23-Mar-17

10

16.78%

0.15%

0.60%

0.45%

0.19%

0.14%

0.03%

0.16%

0.04%

0.00%

9

1.77%

0.27%

0.45%

0.02%

0.11%

0.03%

0.05%

0.01%

2‐Mar‐17 9‐Mar‐17

9-Mar-17 16-Mar-17

8

2.00%

0.05%

0.19%

0.14%

0.03%

0.08%

0.03%

0.02%

0.01%

7

16.21%

0.02%

0.14%

0.11%

0.03%

0.05%

0.02%

0.01%

2-Mar-17

6

14.44%

0.03%

0.11%

0.08%

0.03%

0.02%

0.01%

0.00%

0.00%

5

0.21%

0.03%

0.08%

0.05%

0.02%

0.01%

0.00%

0.00%

4

12.43%

0.03%

0.05%

0.01%

0.00%

0.00%

3

0.06%

0.02%

0.02%

Rev. Recovery Cum. Plan

0.01%

Rev. Recovery Weekly Plan

0.00%

B/L Cum. Plan

2

12.22%

0.01%

0.01%

Cum Actual

0.00% 1

0.00%

Weekly Actual

0.00%

WEEK

0.00%

Overall Project

0.23%

9.28%

0.00%

0.00%

12.16%

9.18%

0.00%

Rev. Recovery Cum. Actual

0.00%

B/L Weekly Plan

0.00%

Rev. Recovery Weekly Actual

0.00%

100.00%

Overall Progress "S" curve

90.00%

80.00% B/L Cum. Plan

60.00% Rev. Recovery Cum. Plan

Rev. Recovery Cum. Actual

50.00%

40.00%

30.00%

20.00%

10.00%

QATAR BRANCH 91.01% 91.80% 92.05% 92.32% 92.47% 92.64% 92.84% 93.34% 93.34% 93.70% 93.70% 93.76% 93.76% 93.84% 93.84% 93.92% 93.92% 94.12% 94.12% 94.15% 94.15% 94.15% 94.17% 94.36% 94.48% 94.53% 94.58% 94.58% 94.64% 94.64% 94.64%

0.25% 0.27% 0.15% 0.17% 0.20% 0.50% 0.00% 0.37% 0.00% 0.05% 0.00% 0.08% 0.00% 0.08% 0.00% 0.20% 0.00% 0.03% 0.00% 0.00% 0.02% 0.19% 0.12% 0.04% 0.05% 0.00% 0.07% 0.00% 0.00%

65.49%

1.84%

0.79%

63.65%

2.67%

0.12%

60.99%

1.90%

90.90%

59.09%

2.22%

1.38%

56.87%

2.89%

89.52%

53.98%

2.44%

0.69%

51.54%

2.76%

88.82%

48.78%

2.59%

88.375%

46.18%

2.79%

0.45%

43.39%

2.30%

Overall Engineering Progress S-Curve "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 "

94.64% 94.64% 94.88% 94.88% 94.88% 94.93% 95.00%

0.00% 0.00% 0.24% 0.00% 0.00% 0.06% 0.07%

DATE:

Page 63 of 170

95.00% 95.00% 100.00% 100.00% 100.00%

5.00%

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

3-Nov-18

0.00% 0.00%

0.00%

0.00%

95.00%

95.00%

95.00%

100

0.00%

99

25-Jul-19

18-Jul-19

11-Jul-19

31-Jan-19

24-Jan-19

98 95.00%

95.00%

97

0.00%

0.00%

27-Dec-18

96

0.00%

20-Dec-18

95

0.00%

13-Dec-18

94

17-Jan-19

6-Dec-18

4‐Apr‐19

25‐Jul‐19

18‐Jul‐19

11‐Jul‐19

4‐Jul‐19

27‐Jun‐19

20‐Jun‐19

13‐Jun‐19

6‐Jun‐19

30‐May‐19

23‐May‐19

16‐May‐19

9‐May‐19

2‐May‐19

25‐Apr‐19

18‐Apr‐19

11‐Apr‐19

80.00%

95.00%

29-Nov-18

28‐Mar‐19

21‐Mar‐19

14‐Mar‐19

7‐Mar‐19

28‐Feb‐19

21‐Feb‐19

14‐Feb‐19

7‐Feb‐19

31‐Jan‐19

24‐Jan‐19

17‐Jan‐19

10‐Jan‐19

3‐Jan‐19

27‐Dec‐18

20‐Dec‐18

13‐Dec‐18

6‐Dec‐18

29‐Nov‐18

22‐Nov‐18

15‐Nov‐18

8‐Nov‐18

1‐Nov‐18

25‐Oct‐18

18‐Oct‐18

11‐Oct‐18

4‐Oct‐18

27‐Sep‐18

20‐Sep‐18

13‐Sep‐18

6‐Sep‐18

30‐Aug‐18

23‐Aug‐18

16‐Aug‐18

9‐Aug‐18

2‐Aug‐18

26‐Jul‐18

19‐Jul‐18

12‐Jul‐18

5‐Jul‐18

28‐Jun‐18

21‐Jun‐18

14‐Jun‐18

7‐Jun‐18

31‐May‐18

24‐May‐18

17‐May‐18

10‐May‐18

3‐May‐18

26‐Apr‐18

19‐Apr‐18

12‐Apr‐18

5‐Apr‐18

29‐Mar‐18

22‐Mar‐18

15‐Mar‐18

8‐Mar‐18

1‐Mar‐18

22‐Feb‐18

15‐Feb‐18

8‐Feb‐18

1‐Feb‐18

25‐Jan‐18

18‐Jan‐18

11‐Jan‐18

4‐Jan‐18

28‐Dec‐17

21‐Dec‐17

14‐Dec‐17

7‐Dec‐17

30‐Nov‐17

23‐Nov‐17

16‐Nov‐17

9‐Nov‐17

2‐Nov‐17

26‐Oct‐17

19‐Oct‐17

12‐Oct‐17

5‐Oct‐17

28‐Sep‐17

21‐Sep‐17

14‐Sep‐17

7‐Sep‐17

31‐Aug‐17

24‐Aug‐17

17‐Aug‐17

10‐Aug‐17

3‐Aug‐17

27‐Jul‐17

20‐Jul‐17

13‐Jul‐17

6‐Jul‐17

29‐Jun‐17

22‐Jun‐17

15‐Jun‐17

8‐Jun‐17

1‐Jun‐17

25‐May‐17

18‐May‐17

11‐May‐17

4‐May‐17

27‐Apr‐17

20‐Apr‐17

13‐Apr‐17

6‐Apr‐17

30‐Mar‐17

23‐Mar‐17

16‐Mar‐17

9‐Mar‐17

2‐Mar‐17

90.00%

0.00%

22-Nov-18

93

3-Jan-19

15-Nov-18

92

10-Jan-19

8-Nov-18

91 95.00%

1-Nov-18

90 95.00%

25-Oct-18

89

0.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

18-Oct-18

88

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

95.00%

95.00%

95.00%

95.00%

87

95.00%

94.64%

0.00%

0.00%

0.00%

0.00%

0.00%

86

0.00%

94.64%

0.00%

94.64%

94.64%

85

95.00%

94.64%

0.00%

0.00%

0.00%

84

0.00%

94.64%

94.64% 0.00%

0.00%

95.00%

83

0.00%

82

94.64%

27-Sep-18

81

0.07%

20-Sep-18

80

94.64%

13-Sep-18

79

0.07%

6-Sep-18

78

4-Oct-18

30-Aug-18

77

11-Oct-18

23-Aug-18

76 95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

16-Aug-18

75

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

95.00%

28-Jun-18

74

94.58%

94.58%

94.53%

94.48%

94.36%

94.17%

94.15%

0.00%

21-Jun-18

73

0.00%

0.05%

0.04%

0.12%

0.19%

0.02%

0.00%

94.15%

14-Jun-18

72

94.58%

94.58%

94.53%

94.48%

94.36%

94.17%

94.15%

0.00%

7-Jun-18

71

0.00%

0.05%

0.04%

0.12%

0.19%

0.02%

0.00%

94.15%

31-May-18

70

0.00%

24-May-18

69

9-Aug-18

17-May-18

68 95.00%

10-May-18

67 95.00%

3-May-18

66

0.00%

26-Apr-18

65

0.00%

19-Apr-18

64

94.15%

12-Apr-18

63

94.12%

5-Apr-18

62

0.03%

29-Mar-18

61

0.00%

22-Mar-18

60

94.15%

15-Mar-18

59

94.12%

8-Mar-18

58

0.03%

1-Mar-18

57

0.00%

22-Feb-18

56

2-Aug-18

15-Feb-18

55

26-Jul-18

8-Feb-18

54 95.00%

1-Feb-18

53

0.00%

25-Jan-18

52

94.12%

18-Jan-18

51

0.20%

11-Jan-18

50

94.12%

4-Jan-18

49

0.20%

28-Dec-17

48

19-Jul-18

21-Dec-17

47 95.00%

14-Dec-17

46

0.00%

7-Dec-17

45

93.92%

30-Nov-17

44

0.00%

23-Nov-17

43

93.92%

16-Nov-17

42

0.00%

9-Nov-17

41

5-Jul-18

2-Nov-17

40

12-Jul-18

26-Oct-17

39 95.00%

19-Oct-17

38 95.00%

12-Oct-17

37

0.00%

5-Oct-17

36

0.00%

28-Sep-17

35

93.92%

21-Sep-17

34

93.84%

7-Sep-17 14-Sep-17

33

0.08%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

95.00%

87.64%

80.23%

31-Aug-17

32

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

5.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

7.36%

7.40%

5.63%

24-Aug-17

31

93.92%

93.84%

93.76%

93.76%

93.70%

93.70%

93.34%

93.34%

92.84%

92.64%

92.47%

92.32%

92.05%

91.80%

91.01%

90.90%

89.52%

88.82%

88.38%

87.29%

83.08%

82.34%

80.89%

79.03%

76.32%

75.14%

73.44%

72.47%

71.83%

70.05%

69.05%

67.61%

65.49%

63.65%

60.99%

59.09%

56.87%

53.98%

51.54%

48.78%

46.18%

43.39%

41.09%

40.04%

74.60%

17-Aug-17

30

93.84%

0.08%

0.00%

0.05%

0.00%

0.37%

0.00%

0.50%

0.20%

0.17%

0.15%

0.27%

0.25%

0.79%

0.12%

1.38%

0.69%

0.45%

1.09%

4.21%

0.75%

1.45%

1.85%

2.71%

1.19%

1.69%

0.97%

0.64%

1.78%

1.00%

1.44%

2.12%

1.84%

2.67%

1.90%

2.22%

2.89%

2.44%

2.76%

2.59%

2.79%

2.30%

1.06%

0.38%

6.60%

68.01%

63.43%

10-Aug-17

29

0.08%

93.84%

93.76%

93.76%

93.70%

93.70%

93.34%

93.34%

92.84%

92.64%

92.47%

92.32%

92.05%

91.80%

91.01%

90.90%

89.52%

88.82%

88.38%

87.29%

83.08%

82.34%

80.89%

79.03%

76.32%

75.14%

73.44%

72.47%

71.83%

70.05%

69.05%

67.61%

65.49%

63.65%

60.99%

59.09%

56.87%

53.98%

51.54%

48.78%

46.18%

43.39%

41.09%

40.04%

39.66%

4.58%

4.06%

3-Aug-17

28

0.00%

0.08%

0.00%

0.05%

0.00%

0.37%

0.00%

0.50%

0.20%

0.17%

0.15%

0.27%

0.25%

0.79%

0.12%

1.38%

0.69%

0.45%

1.09%

4.21%

0.75%

1.45%

1.85%

2.71%

1.19%

1.69%

0.97%

0.64%

1.78%

1.00%

1.44%

2.12%

1.84%

2.67%

1.90%

2.22%

2.89%

2.44%

2.76%

2.59%

2.79%

2.30%

1.06%

0.38%

1.24%

38.42%

36.74%

59.37%

27-Jul-17

27

1.09%

41.09%

1.06%

39.66%

1.69%

1.48%

4.69%

54.68%

20-Jul-17

26

87.29%

40.04%

0.38%

1.24%

38.42%

36.74%

35.25%

4.36%

50.32%

45.35%

25

4.21%

39.66%

1.24%

1.69%

1.48%

2.05%

33.20%

4.97%

4.45%

6-Jul-17 13-Jul-17

24

83.08%

38.42%

1.69%

35.25%

3.74%

29.45%

27.38%

40.90%

37.29%

29-Jun-17

23

0.75%

36.74%

1.48%

2.05%

33.20%

2.07%

4.06%

3.61%

5.24%

22-Jun-17

22

82.34%

35.25%

2.05%

3.74%

29.45%

27.38%

23.32%

21.99%

32.04%

15-Jun-17

21

1.45%

33.20%

3.74%

2.07%

4.06%

1.33%

1.74%

4.04%

28.01%

8-Jun-17

20

80.89%

29.45%

2.07%

23.32%

21.99%

20.25%

2.54%

25.47%

1-Jun-17

19

1.85%

27.38%

4.06%

1.33%

1.74%

0.42%

19.83%

4.13%

21.34%

16.84%

18

79.03%

23.32%

1.33%

20.25%

2.28%

17.55%

4.50%

2.75%

25-May-17

17

2.71%

21.99%

1.74%

0.42%

19.83%

1.89%

15.65%

14.37%

14.09%

18-May-17

16

76.32%

20.25%

0.42%

2.28%

17.55%

1.28%

1.84%

2.23%

11.85%

15

1.19%

19.83%

2.28%

1.89%

15.65%

14.37%

12.54%

3.10%

4-May-17 11-May-17

14

75.14%

17.55%

1.89%

1.28%

1.84%

2.08%

10.45%

8.76%

6.02%

13

73.44%

15.65%

1.28%

12.54%

1.85%

2.74%

2.19%

27-Apr-17

12

1.69%

14.37%

1.84%

2.08%

10.45%

8.60%

6.11%

20-Apr-17

11

0.97%

12.54%

2.08%

1.85%

2.50%

1.76%

3.83%

13-Apr-17

10

72.47%

10.45%

1.85%

8.60%

6.11%

0.59%

3.24%

2.19%

6-Apr-17

9

2.49%

4.35%

1.05%

0.65%

30-Mar-17

8

1.76%

0.85%

3.50%

2.88%

1.54%

23-Mar-17

7

71.83%

8.60%

2.49%

4.35%

0.62%

0.81%

0.28%

1.26%

16-Mar-17

6

0.64%

6.11%

1.76%

0.85%

3.50%

2.88%

2.08%

0.94%

0.32%

0.23%

9-Mar-17

5

1.78%

4.35%

0.85%

0.62%

0.80%

0.68%

1.38%

0.10%

0.20%

2-Mar-17

4

70.05%

3.50%

0.62%

2.08%

0.80%

0.58%

0.13%

0.02%

0.00%

3

1.00%

2.88%

0.80%

0.70%

1.38%

0.45%

0.13%

0.02%

0.00% 2

69.05%

2.08%

0.70%

0.80%

0.58%

0.13%

0.00%

0.00% 1

1.44%

1.38%

0.80%

0.45%

0.13%

0.00%

0.00%

WEEK

67.61%

0.58%

0.00%

Overall Project

2.12%

0.13%

Rev. Weekly Actual

0.45%

Rev. Cum. Actual

0.13%

Rev. Weekly Plan

0.00%

Weekly Actual

0.00%

Rev. Cum. Plan

0.00%

Cum Actual

0.00%

B/L Weekly Plan

0.00%

B/L Cum. Plan

0.00%

0.00%

0.00%

100.00%

B/L Cum. Plan

Cum Actual

70.00%

Rev. Cum. Plan

Rev. Cum. Actual

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

Overall Engineering Progress "S" curve

101 124 125 126

Rev. Recovery Cum. Actual

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.32% 0.39% 0.39% 0.39% 1.08% 1.15% 1.83% 2.65% 2.65% 2.81% 2.98% 3.06% 4.54% 7.62% 8.95% 9.41% 9.66% 9.66% 9.96% 10.64% 10.80% 10.96% 10.96% 10.96% 10.96% 12.68% 13.91% 13.91% 14.24% 14.34% 14.57% 14.57% 14.82% 17.78% 20.34% 21.04% 23.22% 27.07% 27.23% 28.31% 28.85% 29.51% 30.08% 30.151% 34.96% 35.31% 35.52% 36.39% 36.49% 36.49% 36.49% 37.32% 37.59% 41.03% 45.19% 48.25% 49.62% 51.25% 55.34% 55.34% 56.27% 59.14% 62.95% 65.42% 65.73% 65.73% 65.73% 66.29% 66.83% 72.79% 74.21% 80.36% 82.74% 85.20% 89.55% 89.55% 89.55% 89.55%

Rev. Recovery Weekly Actual

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.30% 0.07% 0.00% 0.00% 0.68% 0.08% 0.68% 0.82% 0.00% 0.15% 0.17% 0.08% 1.48% 3.08% 1.33% 0.46% 0.25% 0.00% 0.30% 0.68% 0.15% 0.17% 0.00% 0.00% 0.00% 1.72% 1.23% 0.00% 0.32% 0.10% 0.23% 0.00% 0.26% 2.95% 2.56% 0.70% 2.18% 3.85% 0.16% 1.09% 0.54% 0.66% 0.57% 0.07% 4.81% 0.35% 0.21% 0.87% 0.10% 0.00% 0.00% 0.83% 0.27% 3.43% 4.17% 3.06% 1.37% 1.63% 4.09% 0.00% 0.93% 2.87% 3.81% 2.47% 0.31% 0.00% 0.00% 0.56% 0.54% 5.96% 1.42% 6.15% 2.38% 2.46% 4.35% 0.00% 0.00% 0.00%

Rev. Recovery Weekly Plan

QATAR BRANCH Overall Procurement Progress S-Curve "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 "

89.57% 90.50% 90.55% 94.82% 95.45% 95.66% 96.74%

0.00% 0.93% 0.05% 4.27% 0.63% 0.21% 1.09%

DATE:

Page 64 of 170

98.37% 100.00% 100.00% 100.00% 100.00% 100.00%

0.00% 1.63% 0.00% 0.00% 0.00% 0.00%

98.37%

89.57%

0.00%

1.63%

89.57%

0.00%

89.55%

89.55%

89.55%

89.55%

85.20%

82.74%

80.36%

74.21%

72.79%

66.83%

66.29%

65.73%

65.73%

65.73%

65.42%

62.95%

59.14%

56.27%

55.34%

55.34%

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

25-Oct-18

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

2.04%

2.04%

0.00%

1.36%

2.73%

0.00%

0.00%

0.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

97.96%

95.91%

95.91%

94.55%

91.82%

91.82%

91.82%

14-Jun-18 21-Jun-18 28-Jun-18 5-Jul-18 12-Jul-18 19-Jul-18 26-Jul-18 2-Aug-18 9-Aug-18 16-Aug-18 23-Aug-18 30-Aug-18 6-Sep-18 13-Sep-18 20-Sep-18 27-Sep-18 4-Oct-18 11-Oct-18 18-Oct-18 25-Oct-18 1-Nov-18 8-Nov-18 15-Nov-18 22-Nov-18 29-Nov-18 6-Dec-18 13-Dec-18 20-Dec-18 27-Dec-18 3-Jan-19 10-Jan-19 17-Jan-19 24-Jan-19

62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ## 101 102 103 104

21-Feb-19

14-Feb-19

7-Feb-19

31-Jan-19

7-Jun-18

26-Apr-18

21‐Feb‐19

14‐Feb‐19

7‐Feb‐19

31‐Jan‐19

24‐Jan‐19

17‐Jan‐19

10‐Jan‐19

3‐Jan‐19

27‐Dec‐18

20‐Dec‐18

13‐Dec‐18

6‐Dec‐18

29‐Nov‐18

22‐Nov‐18

15‐Nov‐18

8‐Nov‐18

1‐Nov‐18

25‐Oct‐18

18‐Oct‐18

11‐Oct‐18

4‐Oct‐18

27‐Sep‐18

20‐Sep‐18

13‐Sep‐18

6‐Sep‐18

30‐Aug‐18

23‐Aug‐18

16‐Aug‐18

9‐Aug‐18

2‐Aug‐18

26‐Jul‐18

19‐Jul‐18

12‐Jul‐18

5‐Jul‐18

28‐Jun‐18

21‐Jun‐18

14‐Jun‐18

7‐Jun‐18

31‐May‐18

24‐May‐18

17‐May‐18

10‐May‐18

3‐May‐18

26‐Apr‐18

19‐Apr‐18

12‐Apr‐18

5‐Apr‐18

29‐Mar‐18

22‐Mar‐18

15‐Mar‐18

8‐Mar‐18

1‐Mar‐18

22‐Feb‐18

15‐Feb‐18

8‐Feb‐18

1‐Feb‐18

25‐Jan‐18

18‐Jan‐18

11‐Jan‐18

4‐Jan‐18

28‐Dec‐17

21‐Dec‐17

14‐Dec‐17

7‐Dec‐17

30‐Nov‐17

23‐Nov‐17

16‐Nov‐17

9‐Nov‐17

2‐Nov‐17

26‐Oct‐17

19‐Oct‐17

12‐Oct‐17

5‐Oct‐17

28‐Sep‐17

21‐Sep‐17

14‐Sep‐17

7‐Sep‐17

31‐Aug‐17

24‐Aug‐17

17‐Aug‐17

10‐Aug‐17

3‐Aug‐17

27‐Jul‐17

20‐Jul‐17

13‐Jul‐17

6‐Jul‐17

29‐Jun‐17

22‐Jun‐17

15‐Jun‐17

8‐Jun‐17

1‐Jun‐17

25‐May‐17

18‐May‐17

80.00%

96.74%

89.57%

0.02%

0.00%

0.00%

0.00%

4.35%

2.46%

2.38%

6.15%

1.42%

5.96%

0.54%

0.56%

0.00%

0.00%

0.31%

2.47%

3.81%

2.87%

0.93%

0.00%

4.09%

91.82%

19-Apr-18

4‐May‐17 11‐May‐17

90.00%

0.00%

89.55%

89.55%

89.55%

89.55%

85.20%

82.74%

80.36%

74.21%

72.79%

66.83%

66.29%

65.73%

65.73%

65.73%

65.42%

62.95%

59.14%

56.27%

55.34%

55.34%

0.00%

0.00%

0.00%

4.35%

2.46%

2.38%

6.15%

1.42%

5.96%

0.54%

0.56%

0.00%

0.00%

0.31%

2.47%

3.81%

2.87%

0.93%

0.00%

4.09%

0.0%

12-Apr-18

61

51.25%

5-Apr-18

60

1.63%

29-Mar-18

59

51.25%

22-Mar-18

58

1.63%

15-Mar-18

57

31-May-18

8-Mar-18

56 91.8%

1-Mar-18

55

0.0%

22-Feb-18

54

49.62%

15-Feb-18

53

1.37%

8-Feb-18

52

49.62%

1-Feb-18

51

1.37%

25-Jan-18

50

24-May-18

18-Jan-18

49

17-May-18

11-Jan-18

48 91.8%

4-Jan-18

47 91.8%

28-Dec-17

46

0.0%

21-Dec-17

45

0.0%

14-Dec-17

44

48.25%

7-Dec-17

43

45.19%

30-Nov-17

42

3.06%

23-Nov-17

41

4.17%

16-Nov-17

40

48.25%

9-Nov-17

39

45.19%

2-Nov-17

38

3.06%

26-Oct-17

37

4.17%

19-Oct-17

36

3-May-18

12-Oct-17

35

10-May-18

5-Oct-17

34 91.8%

28-Sep-17

33 85.6%

21-Sep-17

32

6.3%

14-Sep-17

31

3.0%

7-Sep-17

30

41.03%

31-Aug-17

29

37.59%

24-Aug-17

28

3.43%

82.6%

82.6%

78.23%

74.83%

68.58%

64.37%

64.16%

60.97%

59.60%

56.87%

17-Aug-17

27

0.27%

0.0%

4.3%

3.40%

6.25%

4.21%

0.21%

3.19%

1.37%

2.73%

1.08%

55.79%

54.82%

3.19% 0.96%

51.63%

50.80%

47.54%

47.34%

43.96%

42.74%

40.73%

38.83%

0.84%

3.26%

0.20%

3.37%

1.23%

2.01%

1.90%

1.76%

37.07%

32.29%

1.88% 4.78%

30.41%

30.09%

26.91%

26.26%

25.88%

21.60%

20.94%

18.80%

17.49%

16.72%

16.60%

14.44%

13.27%

12.56%

12.04%

0.32%

3.18%

0.65%

0.38%

4.28%

0.66%

2.14%

1.31%

0.77%

0.12%

2.16%

1.17%

0.71%

0.52%

0.52%

26

41.03%

37.32%

36.49%

36.49%

36.49%

36.39%

35.52%

35.31%

34.96%

30.15%

30.08%

29.51%

28.85%

28.31%

27.23%

27.07%

23.22%

21.04%

20.34%

17.78%

14.82%

14.57%

14.57%

14.34%

14.24%

13.91%

13.91%

12.68%

10.96%

10.96%

10.96%

10.96%

10.80%

10.64%

9.96%

9.66%

9.66%

9.41%

25

37.59%

0.83%

0.00%

0.00%

0.10%

0.87%

0.21%

0.35%

4.81%

0.07%

0.57%

0.66%

0.54%

1.09%

0.16%

3.85%

2.18%

0.70%

2.56%

2.95%

0.26%

0.00%

0.23%

0.10%

0.32%

0.00%

1.23%

1.72%

0.00%

0.00%

0.00%

0.17%

0.15%

0.68%

0.30%

0.00%

0.25%

0.46%

27-Jul-17

24

3.43%

37.32%

36.49%

36.49%

36.49%

36.39%

35.52%

35.31%

34.96%

30.15%

30.08%

29.51%

28.85%

28.31%

27.23%

27.07%

23.22%

21.04%

20.34%

17.78%

14.82%

14.57%

14.57%

14.34%

14.24%

13.91%

13.91%

12.68%

10.96%

10.96%

10.96%

10.96%

10.80%

10.64%

9.96%

9.66%

9.66%

9.41%

20-Jul-17

23

0.27%

0.83%

0.00%

0.00%

0.10%

0.87%

0.21%

0.35%

4.81%

0.07%

0.57%

0.66%

0.54%

1.09%

0.16%

3.85%

2.18%

0.70%

2.56%

2.95%

0.26%

0.00%

0.23%

0.10%

0.32%

0.00%

1.23%

1.72%

0.00%

0.00%

0.00%

0.17%

0.15%

0.68%

0.30%

0.00%

0.25%

0.46%

13-Jul-17

3-Aug-17

6-Jul-17

22

10-Aug-17

29-Jun-17

21

8.92%

22-Jun-17

20

11.51%

15-Jun-17

19

2.59%

8-Jun-17

18

0.11%

1-Jun-17

17

8.95%

25-May-17

16

7.62%

18-May-17

15

1.33%

8.81%

8.81%

6.90%

6.47%

6.32%

4.15%

4.15%

2.41%

2.41%

1.67%

1.67%

14

3.08%

0.00%

1.91%

0.43%

0.15%

2.17%

0.00%

1.75%

0.00%

0.74%

0.00%

1.36%

13

8.95%

4.54%

3.06%

2.98%

2.81%

2.65%

2.65%

1.83%

1.15%

1.08%

0.39%

0.39% 12

7.62%

1.48%

0.08%

0.17%

0.15%

0.00%

0.82%

0.68%

0.08%

0.68%

0.00%

0.00%

11

1.33%

4.54%

3.06%

2.98%

2.81%

2.65%

2.65%

1.83%

1.15%

1.08%

0.39%

0.39%

4-May-17

27-Apr-17

11-May-17

20-Apr-17

10

3.08%

1.48%

0.08%

0.17%

0.15%

0.00%

0.82%

0.68%

0.08%

0.68%

0.00%

0.00%

0.31%

13-Apr-17

9

0.23%

6-Apr-17

8

0.08%

20‐Apr‐17 27‐Apr‐17

30-Mar-17

7

0.00%

6‐Apr‐17 13‐Apr‐17

23-Mar-17

6

0.39%

30‐Mar‐17

16-Mar-17

5

0.32%

16‐Mar‐17 23‐Mar‐17

9-Mar-17

4

0.07%

0.23%

0.23%

0.15%

0.15%

0.00%

0.00%

0.00%

2‐Mar‐17 9‐Mar‐17

2-Mar-17

3

0.30%

0.00%

0.08%

0.00%

0.15%

0.00%

0.00%

0.00%

0.00%

0.00%

2

0.39%

0.02%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1

0.32%

0.02%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

WEEK

0.07%

0.02%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Overall Project

0.30%

0.02%

0.00%

0.00%

0.00%

0.00%

0.00%

Rev. Recovery Cum. Plan

0.00%

Weekly Actual

0.00%

Cum Actual

0.00%

B/L Weekly Plan

0.00%

B/L Cum. Plan

0.00%

0.00%

0.00%

100.00%

B/L Cum. Plan

Cum Actual

70.00%

Rev. Recovery Cum. Plan

Rev. Recovery Cum. Actual

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

Overall Procurement Progress "S" curve

QATAR BRANCH 0.00% 0.00% 0.04% 0.09% 0.47% 0.84% 0.93% 1.00% 1.08% 1.09% 1.60% 1.73%

0.00% 0.00% 0.04% 0.05% 0.38% 0.38% 0.08%

Overall Construction Progress S-Curve

0.07% 0.08% 0.01% 0.50% 0.14%

10.38% 11.14% 11.94% 11.94% 13.46% 14.80% 16.16% 16.90% 18.49% 20.94% 22.08% 22.71% 23.17% 24.05% 24.94% 24.96%

0.64% 0.75% 0.80% 0.00% 1.53% 1.34% 1.36% 0.75% 1.59% 2.45% 1.14% 0.63% 0.45% 0.88% 0.90% 0.02%

"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 "

33.88% 37.30% 41.59% 45.62% 49.68% 55.99% 63.48% 70.92% 72.75% 74.14% 76.08% 78.68% 81.97% 84.90% 88.01%

2.83% 3.42% 4.28% 4.03% 4.06% 6.31% 7.49% 7.44% 1.82% 1.39% 1.95% 2.59% 3.29% 2.93% 3.11%

DATE:

93.53% 94.42% 95.67% 96.94% 97.78% 98.37% 98.52% 98.85% 99.08% 99.30% 99.39% 99.55% 99.62% 99.84% 99.96% 100.00%

1.77% 0.89% 1.24% 1.27% 0.84% 0.58% 0.15% 0.34% 0.23% 0.22% 0.09% 0.16% 0.07% 0.22% 0.12% 0.04%

91.76%

31.05%

2.70%

1.73%

28.35%

2.39%

90.03%

25.96%

2.02%

24.96% 1.00%

24.94%

24.05%

23.17%

22.71%

22.08%

20.94%

18.49%

16.90%

16.16%

14.80%

13.46%

11.94%

11.94%

11.14%

10.38%

9.75%

9.33%

0.02%

0.90%

0.88%

0.45%

0.63%

1.14%

2.45%

1.59%

0.75%

1.36%

1.34%

1.53%

0.00%

0.80%

0.75%

0.64%

0.42%

0.42%

24.96%

24.94%

24.05%

23.17%

22.71%

22.08%

20.94%

18.49%

16.90%

16.16%

14.80%

13.46%

11.94%

11.94%

11.14%

10.38%

9.75%

9.33%

0.02%

0.90%

0.88%

0.45%

0.63%

1.14%

2.45%

1.59%

0.75%

1.36%

1.34%

1.53%

0.00%

0.80%

0.75%

0.64%

0.42%

0.42%

16-Aug-18 23-Aug-18 30-Aug-18 6-Sep-18 13-Sep-18 20-Sep-18 27-Sep-18 4-Oct-18 11-Oct-18 18-Oct-18 25-Oct-18 1-Nov-18 8-Nov-18 15-Nov-18 22-Nov-18 29-Nov-18 6-Dec-18 13-Dec-18 20-Dec-18 27-Dec-18 3-Jan-19 10-Jan-19 17-Jan-19

78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123

2.20% 1.59% 1.20% 1.69% 1.73% 3.06% 1.93% 2.56% 4.26% 3.86% 3.21% 2.14% 3.85% 2.82% 3.79% 2.81% 1.79% 2.21% 2.67% 2.30% 0.88% 0.55% 0.17% 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

50.47% 51.67% 53.36% 55.09% 58.15% 60.08% 62.64% 66.90% 70.76% 73.97% 76.11% 79.96% 82.78% 86.57% 89.38% 91.17% 93.38% 96.04% 98.34% 99.22% 99.77% 99.94% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

0.00%

9-Aug-18

77

100.00%

2-Aug-18

76 0.00%

26-Jul-18

75

100.00%

19-Jul-18

74

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

25-Oct-18

Page 65 of 170

4-Jul-19

27-Jun-19

20-Jun-19

13-Jun-19

6-Jun-19

30-May-19

23-May-19

16-May-19

23‐May‐19

4‐Jul‐19

27‐Jun‐19

20‐Jun‐19

13‐Jun‐19

6‐Jun‐19

30‐May‐19

10.00%

16‐May‐19

9‐May‐19

2‐May‐19

25‐Apr‐19

18‐Apr‐19

11‐Apr‐19

4‐Apr‐19

28‐Mar‐19

21‐Mar‐19

14‐Mar‐19

7‐Mar‐19

28‐Feb‐19

21‐Feb‐19

14‐Feb‐19

7‐Feb‐19

31‐Jan‐19

24‐Jan‐19

17‐Jan‐19

10‐Jan‐19

3‐Jan‐19

27‐Dec‐18

20‐Dec‐18

13‐Dec‐18

6‐Dec‐18

29‐Nov‐18

22‐Nov‐18

15‐Nov‐18

8‐Nov‐18

1‐Nov‐18

25‐Oct‐18

18‐Oct‐18

11‐Oct‐18

4‐Oct‐18

27‐Sep‐18

20‐Sep‐18

13‐Sep‐18

6‐Sep‐18

30‐Aug‐18

23‐Aug‐18

16‐Aug‐18

9‐Aug‐18

2‐Aug‐18

26‐Jul‐18

19‐Jul‐18

12‐Jul‐18

5‐Jul‐18

28‐Jun‐18

21‐Jun‐18

14‐Jun‐18

7‐Jun‐18

31‐May‐18

24‐May‐18

17‐May‐18

10‐May‐18

3‐May‐18

26‐Apr‐18

19‐Apr‐18

12‐Apr‐18

5‐Apr‐18

29‐Mar‐18

22‐Mar‐18

15‐Mar‐18

8‐Mar‐18

1‐Mar‐18

22‐Feb‐18

15‐Feb‐18

8‐Feb‐18

1‐Feb‐18

25‐Jan‐18

18‐Jan‐18

11‐Jan‐18

4‐Jan‐18

28‐Dec‐17

21‐Dec‐17

14‐Dec‐17

7‐Dec‐17

30‐Nov‐17

23‐Nov‐17

16‐Nov‐17

9‐Nov‐17

2‐Nov‐17

26‐Oct‐17

19‐Oct‐17

12‐Oct‐17

5‐Oct‐17

28‐Sep‐17

21‐Sep‐17

14‐Sep‐17

7‐Sep‐17

31‐Aug‐17

24‐Aug‐17

17‐Aug‐17

10‐Aug‐17

3‐Aug‐17

27‐Jul‐17

20‐Jul‐17

13‐Jul‐17

6‐Jul‐17

29‐Jun‐17

22‐Jun‐17

15‐Jun‐17

8‐Jun‐17

1‐Jun‐17

25‐May‐17

18‐May‐17

11‐May‐17

4‐May‐17

27‐Apr‐17

20‐Apr‐17

13‐Apr‐17

6‐Apr‐17

30‐Mar‐17

23‐Mar‐17

16‐Mar‐17

9‐Mar‐17

2‐Mar‐17

20.00%

9-May-19

2-May-19

25-Apr-19

18-Apr-19

11-Apr-19

4-Apr-19

28-Mar-19

21-Mar-19

14-Mar-19

7-Mar-19

28-Feb-19

21-Feb-19

14-Feb-19

7-Feb-19

31-Jan-19

24-Jan-19

12-Jul-18

73

1.81%

2.09% 44.87%

72

48.88%

2.56% 42.78%

71

46.68%

28-Jun-18

1.84% 40.22%

5-Jul-18

21-Jun-18

1.6%

7-Jun-18

70

1.33%

14-Jun-18

69

38.37%

31-May-18

68

37.05%

24-May-18

67

1.8%

17-May-18

66

35.5%

1.7%

1.9%

65

0.52%

0.83%

1.33%

0.69%

33.7%

32.0%

26-Apr-18

64

8.91%

8.39%

7.56%

6.22%

0.25%

0.17%

19-Apr-18

63

8.91%

8.39%

7.56%

6.22%

5.53%

5.28%

12-Apr-18

62

0.52%

0.83%

1.33%

0.69%

5.53%

5-Apr-18

61

5.28%

29-Mar-18

60

0.25%

22-Mar-18

59

0.17%

15-Mar-18

58

3-May-18

8-Mar-18

57

10-May-18

1-Mar-18

56 1.2%

22-Feb-18

55

30.1%

15-Feb-18

54

0.20%

8-Feb-18

53

5.10%

1-Feb-18

52

5.10%

25-Jan-18

51

0.20%

18-Jan-18

50 1.2%

1.2%

1.6%

1.03%

1.30%

1.53%

1.47%

0.95%

1.44%

2.26%

1.47%

0.91%

1.19%

1.38%

1.81%

1.53%

49

28.9%

27.7%

26.4%

24.86%

23.84%

22.54%

21.01%

19.54%

18.59%

17.14%

14.88%

13.41%

12.50%

11.30%

9.92%

8.11%

4-Jan-18 11-Jan-18

48

0.12%

0.21%

0.18%

0.85%

0.28%

0.56%

0.57%

0.15%

0.14%

0.07%

0.04%

0.14%

0.50%

0.01%

0.08%

0.07%

0.93%

0.74%

28-Dec-17

47

4.91%

4.78%

4.57%

4.40%

3.55%

3.28%

2.72%

2.14%

1.99%

1.85%

1.78%

1.73%

1.60%

1.09%

1.08%

1.00%

6.58%

5.65%

21-Dec-17

46

4.91%

4.78%

4.57%

4.40%

3.55%

3.28%

2.72%

2.14%

1.99%

1.85%

1.78%

1.73%

1.60%

1.09%

1.08%

1.00%

0.08%

0.38%

0.37%

0.21%

7-Dec-17

30-Nov-17

14-Dec-17

23-Nov-17

45

0.12%

0.21%

0.18%

0.85%

0.28%

0.56%

0.57%

0.15%

0.14%

0.07%

0.04%

0.14%

0.50%

0.01%

0.08%

0.07%

0.93%

0.84%

4.91%

4.53%

0.21%

0.81%

16-Nov-17

44

0.93%

0.38%

0.05%

4.32%

4.11%

0.51%

0.28%

9-Nov-17

43

0.84%

0.47%

0.09%

0.04%

0.00%

3.30%

2.79%

0.30%

2-Nov-17

42

0.08%

0.47%

0.09%

0.04%

0.00%

0.00%

0.00%

2.51%

0.26%

0.21%

26-Oct-17

41

0.38%

0.38%

0.05%

0.04%

0.00%

0.00%

0.00%

0.00%

2.21%

1.95%

19-Oct-17

40

0.04%

0.00%

0.00%

0.00%

0.00%

0.00%

0.67%

0.48%

39

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1.74%

1.07%

5-Oct-17 12-Oct-17

38

9.75%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.20%

0.18%

28-Sep-17

37

9.33%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.59%

0.39%

21-Sep-17

36

0.42%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.17%

0.05%

14-Sep-17

35

0.42%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.22%

0.05%

7-Sep-17

34

8.91%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

31-Aug-17

33

0.52%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

24-Aug-17

32

8.39%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

17-Aug-17

31

7.56%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

10-Aug-17

30

0.83%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

3-Aug-17

29

1.33%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

27-Jul-17

28

6.22%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

20-Jul-17

27

0.69%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

26

5.53%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6-Jul-17 13-Jul-17

25

5.28%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

29-Jun-17

24

0.25%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

22-Jun-17

23

0.17%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

15-Jun-17

22

5.10%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

8-Jun-17

21

0.20%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1-Jun-17

20

4.91%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

19

4.78%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

25-May-17

18

0.12%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

18-May-17

17

0.21%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4-May-17 11-May-17

16

4.57%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

15

0.18%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

27-Apr-17

14

4.40%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00% 20-Apr-17

13

0.85%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6-Apr-17 13-Apr-17

12

3.55%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

30-Mar-17

11

0.28%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

23-Mar-17

10

3.28%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

9

2.72%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

9-Mar-17 16-Mar-17

8

0.56%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

2-Mar-17

7

0.57%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6

2.14%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

5

0.15%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4

1.99%

0.00%

0.00%

0.00%

0.00% 3

0.14%

0.00%

0.00%

Rev. Recovery Weekly Plan

0.00%

Rev. Recovery Cum. Plan

2

1.78%

0.00%

0.00%

Cum Actual

0.00% 1

0.00%

B/L Cum. Plan

0.00%

WEEK

0.00%

Weekly Actual

0.00%

B/L Weekly Plan

1.849%

0.00%

Overall Project

0.07%

0.00%

Rev. Recovery Weekly Actual

0.00%

0.00%

0.04%

Rev. Recovery Cum. Actual

0.00%

100.00%

90.00%

Overall Construction Progress "S" curve

80.00%

70.00%

60.00%

50.00%

40.00%

30.00%

B/L Cum. Plan

Cum Actual

Rev. Recovery Cum. Plan

Rev. Recovery Cum. Actual

Revised Weekly Actual Revised Weekly Plan

Revised Cumulative Actual

QATAR BRANCH 7.00%

6.35%

0.21% 0.04% 30.87%

0.30% 0.09% 37.22%

0.21%

1-Nov-18

8-Nov-18

15-Nov-18

22-Nov-18

29-Nov-18

W-89 W-90 W-91 W-92

0.00% 0.00% 55.66% #####

Pre-Commisioning & Commissioning Progress S-Curve "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 "

44.04%

46.78%

52.04%

56.36%

57.67%

59.44%

64.54%

71.98%

0.88% 2.74% 5.26% 4.33% 1.31% 1.76% 5.10% 7.44%

100.00%

43.16%

0.00%

#####

43.16%

0.13%

89.68%

43.03%

0.00%

5.66%

43.03%

0.00%

84.03%

43.03%

0.00%

#####

43.03%

7.95%

Doha, Qatar

Page 66 of 170

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

100.00% 0.00%

23-May-19

16-May-19

9-May-19

2-May-19

25-Apr-19

18-Apr-19

11-Apr-19

4-Apr-19

28-Mar-19

21-Mar-19

14-Mar-19

7-Mar-19

28-Feb-19

21-Feb-19

14-Feb-19

7-Feb-19

31-Jan-19

24-Jan-19

17-Jan-19

W-98 100.00% 0.00%

W-97

35.08%

9.89%

W-96

#####

19.41%

8.11%

10-Jan-19 9.52%

1.11%

W-95 100.00% 0.00%

1.40%

0.00%

3-Jan-19

0.30%

0.00%

W-94 100.00% 0.00%

100.00% 3.95% 0.30%

27-Dec-18

8.80%

96.05% 0.30%

W-93 100.00% 0.00%

6.24%

87.25%

20-Dec-18

7.55%

81.01%

13-Dec-18

8.70%

73.46%

6-Dec-18

9.10%

0.00% -0.30% 44.24%

W-88 7.03%

6.68%

25-Oct-18

0.17% 0.00%

W-87

64.76%

0.00%

0.30%

0.30%

0.30% 0.09%

0.09%

18-Oct-18

6.53%

0.17% 0.00% 23.87%

0.17%

0.00%

0.21% 0.04%

0.04%

11-Oct-18

0.17% 0.00% 17.34% #####

0.17%

0.17%

0.30%

0.17% 0.00%

0.00%

4-Oct-18

W-86

0.00%

0.17% 0.00%

0.00%

W-85

3.15%

W-84

4.45%

W-83

0.17% 0.00%

W-82

0.17%

27-Sep-18

13-Sep-18

W-81

2.23%

1.10%

6-Sep-18

W-80

0.30%

0.17% 0.00%

0.00%

1.30%

0.00%

30-Aug-18

W-79 20-Sep-18

0.17% 0.17%

0.19%

0.14%

23-Aug-18

W-78

0.00%

0.17% 0.00%

0.00%

0.17%

0.00% 0.00%

0.19%

0.05%

16-Aug-18

W-77

0.30%

0.17% 0.17%

0.17%

0.00%

0.00% 0.00%

0.05%

0.00%

9-Aug-18

W-76

0.00%

0.00% 0.00%

0.00%

0.00%

0.00% 0.00%

0.00%

0.00%

W-75

0.30%

0.00% 0.00%

0.00%

0.00%

0.00% 0.00%

0.00%

2-Aug-18

Week

0.00%

0.00% 0.00%

0.00%

0.00%

0.00% 0.00%

Overall Construction

0.30%

0.00% 0.00%

0.00%

0.00%

0.00%

23‐May‐19

16‐May‐19

9‐May‐19

2‐May‐19

25‐Apr‐19

18‐Apr‐19

11‐Apr‐19

4‐Apr‐19

28‐Mar‐19

21‐Mar‐19

14‐Mar‐19

7‐Mar‐19

28‐Feb‐19

21‐Feb‐19

14‐Feb‐19

7‐Feb‐19

31‐Jan‐19

24‐Jan‐19

17‐Jan‐19

10‐Jan‐19

3‐Jan‐19

27‐Dec‐18

20‐Dec‐18

13‐Dec‐18

6‐Dec‐18

29‐Nov‐18

22‐Nov‐18

15‐Nov‐18

8‐Nov‐18

1‐Nov‐18

25‐Oct‐18

18‐Oct‐18

11‐Oct‐18

4‐Oct‐18

27‐Sep‐18

20‐Sep‐18

13‐Sep‐18

6‐Sep‐18

30‐Aug‐18

23‐Aug‐18

16‐Aug‐18

B/L Cum. Plan

0.00%

0.00% 0.00%

Revised Cumulative Plan

0.00%

9‐Aug‐18

80.00%

0.00%

Cum Actual

0.00% 0.00%

Weekly Actual

0.00%

B/L Cum. Plan

0.00% 0.00%

B/L Weekly Plan

0.00%

0.00% 2‐Aug‐18

100.00%

90.00%

Pre‐Commisioning & Commisioning Progress "S" Curve

Cum Actual

Revised Cumulative Plan

70.00%

Revised Cumulative Actual

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

W-99 W-100 W-101 W-102 W-103 W-104 W-105 W-106 W-107 W-108 W-109 W-110 W-111 W-112 W-113 W-114 W-115 W-116 W-117

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

DATE: 25-Oct-18

QATAR BRANCH 0.00%

0.00%

0.00%

0.00%

Overall Project Close-Out S-Curve EPIC OF REPLACMENT OF THREE PHASE TEST DATE: SEPARATORS IN ALL DEGASSING STATIONS

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Cum Act 0.00%

0.00%

0.00%

0.00%

11.29%

11.29%

11.29%

33.87%

45.16%

56.45%

11.29%

9.68%

0.00%

0.00%

90.32%

100.00%

100.00%

100.00%

11.29%

11.29%

22.58%

79.03%

11.29%

11.29%

11.29%

0.00%

0.00%

67.74%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Cum. Plan

0.00%

0.00%

Week Plan

0.00%

Week Act

0.00%

Overall Project C 22-Jan-19

29-Jan-19

5-Feb-19

12-Feb-19

19-Feb-19

26-Feb-19

5-Mar-19

12-Mar-19

19-Mar-19

26-Mar-19

2-Apr-19

9-Apr-19

16-Apr-19

23-Apr-19

30-Apr-19

7-May-19

14-May-19

21-May-19

28-May-19

4-Jun-19

11-Jun-19

18-Jun-19

25-Jun-19

2-Jul-19

9-Jul-19

16-Jul-19

23-Jul-19

30-Jul-19

6-Aug-19

100.00%

Close‐Out "S"Curve 100.00%

90.00% 90.00%

80.00%

70.00% 80.00%

60.00% Week Act 70.00%

50.00%

40.00%

20.00% 60.00%

Cum. Plan 50.00%

30.00% 40.00%

Cum Act 30.00%

10.00% 20.00%

10.00%

0.00% 0.00%

Week 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

25-Oct-18

Doha, Qatar

Page 67 of 170

PROJECT PLANNING PACKAGE

Attachment 6

MANPOWER HISTOGRAM

Page 68 of 170

Sr.No.

A

DESCRIPTION

PEAK QTY

MAN MONTH

Project Timeline (Monthwise) Nov-18

Dec-18

Jan-19

1

CIVIL TEAM

40

95

40

35

20

2

INSTRUMENT TEAM

40

82

12

40

30

3

ELECTRICAL TEAM

24

48

4

PIPING TEAM

24

60

B

Feb-19

Mar-19

12

Apr-19

May-19

JELAHA STATION

-

24

24

12

24

24

20

CIVIL TEAM

30

107

30

25

20

2

INSTRUMENT TEAM

24

96

24

24

24

12

12

3

ELECTRICAL TEAM

16

66

14

16

16

10

10

PIPING TEAM

20

66

14

20

20

12

17

15

12

10

8

14

20

20

20

20

4

FAHAHIL SOUTH

-

CIVIL TEAM

22

102

2

INSTRUMENT TEAM

20

94

3

ELECTRICAL TEAM

12

56

4

PIPING TEAM

12

70

FAHAHIL NORTH

-

Sep-19

18

22

12

12

12

10

10

10

12

12

12

12

12

25

22

20

10

10

12

16

16

16

12

12

12

12

10

12

12

12

12

12

22

20

20

15

15

20

20

20

12

-

1

CIVIL TEAM

25

109

2

INSTRUMENT TEAM

16

72

3

ELECTRICAL TEAM

12

64

4

PIPING TEAM

12

60

E

FAHAHIL MAIN

-

22

6

12

-

1

CIVIL TEAM

22

130

2

INSTRUMENT TEAM

20

72

3

ELECTRICAL TEAM

12

64

6

12

12

12

12

10

4

PIPING TEAM

20

88

8

8

20

20

20

12

332

1,601 -

TOTAL

00 REV NO

Aug-19

-

1

D

Jul-19

-

1

C

Jun-19

ALL KHATIYA STATIONS

ISSUED FOR APPROVAL DETAIL

1-Nov-18 DATE

16

140

22

290

332

271

232

203

133

-

-

-

-

-

REPLACEMENT THREE PHASE TEST SEPARATOR

VS BY

Page 69 of 170

Sr.No.

1

DESCRIPTION

PEAK QTY

CONTRACT REPRESENTATIVE

MAN MONTHS 1

9

Project Timeline (Monthwise) Nov-18

Dec-18 1

1

Jan-19

Feb-19

Mar-19

Apr-19

May-19

Jun-19

Jul-19

1

1

1

1

1

1

1

2

DPEPUTY PROJECT MANAGER

1

9

1

1

1

1

1

1

1

1

1

2

CONSTRUCTION MANAGER

1

9

1

1

1

1

1

1

1

1

1

3

QA/QC MANAGER

1

9

1

1

1

1

1

1

1

1

1

4

HSE MANAGER

1

9

1

1

1

1

1

1

1

1

1

5

COMMISSIONG MANANGER

1

9

1

1

1

1

1

1

1

1

1

6

SR. PLANNING/COORDINATOR

1

9

1

1

1

1

1

1

1

1

1

7

SR. PLANNING ENGINEER

1

9

1

1

1

1

1

1

1

1

1

8

SITE PLANNING ENGINEER

1

9

1

1

1

1

1

1

1

1

1

1

9

LEAD HSE OFFICER

10

HSE OFFICERS

11

MECHANICAL ENGINEER

1

9

1

1

14

104

12

14

1

9

1

1

1 14

1

1 14

1

1 14

1

1 14

1

1 10

1

1

6

INSTRUMENT ENGINEER

1

9

1

1

1

1

1

1

1

1

1

ELETRICAL ENGINEER

1

9

1

1

1

1

1

1

1

1

1 1

14

QA/QC ENGINEER

1

9

1

1

1

1

1

1

1

1

15

QA /QC INSPECTOR

6

54

6

6

6

6

6

6

6

6

6

16

CIVIL ENGINEER

1

9

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

6

6

6

6

6

6

6

6

6

1

COMMISSIONG ENGINEER

1

6

ADMIN TEAM

6

54

19

PRO OFFICCER

1

9

1

1

20

PTW - COORDINATOR

1

9

1

1

1

1

1

1

1

21

SITE SUPERVISORS - PTW

20

164

20

20

20

20

20

20

20

61

64

64

63

63

64

60

TOTAL

64

-

ISSUED FOR APPROVAL DETAIL

1-Nov-18 DATE

1

1

1

1

1 1

12

1 12

535

-

00 REV NO

1

Oct-19

1

12

17

Sep-19

1 6

13

18

Aug-19

VS BY

TITLE:

48

48

-

-

-

-

DIRECT MANPOWER DEPLOYMENT SCHEDULE CIVIL, MECHANICAL AND E&I WORKS FOR REPLACEMENT THREE PHASE TEST SEPARATOR AT DUKHAN, QATAR

Page 70 of 170

PROJECT PLANNING PACKAGE

Attachment 7

ENGINEERING DOCUMENT DELIVERABLE REGISTER

Page 71 of 170

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

SRN

SEQ

1

1

DISCIPLINE GENERAL

DOC NO

DOC NO 3963‐DGEN‐0‐00‐0002

ITEM CODE

DOC DESC

ITEM CODE OT

DOC CLASS

CURRENT REVISION

SHUTD OWN PACKA GE SHUTD OWN

Original BL WV

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100% ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

DOC CLASS

CURRENT REVISION

WV

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

ACTS

ACTD

ACTIFC

ACTIFA

ACTIAWH

ACTIAFC

ENGINEERING DOCUMENT & DELIVERABLES REGISTER (EDDR)

1

A

0.417%

14‐Mar‐17

24‐Mar‐17

29‐Mar‐17

14‐May‐17

4‐Jun‐17

14‐Jun‐17

31‐Oct‐18

12‐Mar‐17

20‐Mar‐17

29‐Mar‐17

3‐Aug‐17

3‐Aug‐17

3‐Aug‐17

22‐Jul‐19

12‐Mar‐17

20‐Mar‐17

29‐Mar‐17

3‐Aug‐17

3‐Aug‐17

3‐Aug‐17

95%

95%

0%

0.396%

0.396%

DOC DESC

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS

Plan WF

Actual WF

2

1

GENERAL

3963‐DGEN‐0‐29‐0001

OT

DESIGN BASIS MEMORANDUM

1

A

0.222%

15‐Mar‐17

25‐Mar‐17

30‐Mar‐17

30‐Apr‐17

21‐May‐17

31‐May‐17

31‐Oct‐18

15‐Mar‐17

29‐Mar‐17

29‐Mar‐17

29‐Jun‐17

26‐Jul‐17

7‐Dec‐17

22‐Jul‐19

15‐Mar‐17

29‐Mar‐17

29‐Mar‐17

29‐Jun‐17

26‐Jul‐17

7‐Dec‐17

95%

95%

0%

0.211%

0.211%

3

1

GENERAL

3963‐DGEN‐0‐04‐0003

OT

ENGINEERING EXECUTION PLAN

1

A

0.278%

15‐Mar‐17

25‐Mar‐17

30‐Mar‐17

30‐Apr‐17

21‐May‐17

31‐May‐17

31‐Oct‐18

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

10‐May‐17

10‐May‐17

10‐May‐17

22‐Jul‐19

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

10‐May‐17

10‐May‐17

10‐May‐17

95%

95%

0%

0.264%

0.264%

21‐May‐17

31‐May‐17

31‐Oct‐18

15‐Mar‐17

17‐Mar‐17

29‐Mar‐17

25‐May‐17

21‐Jun‐17

22‐Jul‐19

15‐Mar‐17

17‐Mar‐17

29‐Mar‐17

25‐May‐17

SITE VISIT (1) ‐ REPORT

1

A

0.972%

15‐Mar‐17

25‐Mar‐17

30‐Mar‐17

30‐Apr‐17

5

1

GENERAL

3963‐DGEN‐0‐17‐0002

OT

SITE VISIT (2) ‐ REPORT

1

A

0.417%

29‐Apr‐17

1‐May‐17

4‐May‐17

25‐May‐17

15‐Jun‐17

25‐Jun‐17

31‐Oct‐18

2‐May‐17

4‐May‐17

4‐May‐17

1‐Jun‐17

17‐Jul‐17

18‐Jul‐17

22‐Jul‐19

2‐May‐17

4‐May‐17

4‐May‐17

1‐Jun‐17

17‐Jul‐17

18‐Jul‐17

95%

95%

0%

0.396%

0.396%

6

4

1

GENERAL

3963‐DGEN‐0‐17‐0003

OT

SITE VISIT‐3 REPORT BY SYSTEM OEM (YOKOGAWA) FOR KAHM / KAHN / KAHS / JALM

1

A

0.056%

30‐Jul‐17

7‐Aug‐17

10‐Aug‐17

31‐Aug‐17

14‐Sep‐17

21‐Sep‐17

31‐Oct‐18

22‐Sep‐17

23‐Sep‐17

25‐Sep‐17

19‐Oct‐17

19‐Oct‐17

14‐Dec‐17

22‐Jul‐19

22‐Sep‐17

23‐Sep‐17

25‐Sep‐17

19‐Oct‐17

19‐Oct‐17

14‐Dec‐17

95%

95%

0%

0.053%

0.053%

3963‐DGEN‐0‐17‐0004

OT

SITE VISIT‐4 REPORT BY SYSTEM OEM (EMERSON) FOR FAHM / FAHN / FAHS

1

A

0.042%

30‐Jul‐17

7‐Aug‐17

10‐Aug‐17

14‐Sep‐17

21‐Sep‐17

31‐Oct‐18

27‐Jul‐17

30‐Jul‐17

31‐Jul‐17

5‐Oct‐17

8‐Oct‐17

8‐Oct‐17

22‐Jul‐19

27‐Jul‐17

30‐Jul‐17

31‐Jul‐17

5‐Oct‐17

8‐Oct‐17

8‐Oct‐17

0.042%

16‐Aug‐17

16‐Aug‐17

16‐Aug‐17

23‐Aug‐17

23‐Aug‐17

30‐Aug‐17

31‐Oct‐18

12‐Jan‐18

15‐Jan‐18

18‐Jan‐18

21‐Jan‐18

26‐Jan‐18

27‐Jan‐18

22‐Jul‐19

12‐Jan‐18

15‐Jan‐18

18‐Jan‐18

21‐Jan‐18

26‐Jan‐18

27‐Jan‐18

95%

95%

0%

0.040%

0.040%

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

10‐Jun‐17

4‐Dec‐17

7

1

1

GENERAL

GENERAL

3963‐DGEN‐0‐17‐0001

OT

8

7

GENERAL

3963‐DGEN‐0‐00‐0001

OT

MISCELLANEOUS ‐ GENERAL

0

9

7

PROCESS

3963‐FAHM‐6‐52‐0001

OT

DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION GENERAL , PROCESS FLOW DIAGRAM

1

10

OT

31‐Aug‐17

10‐May‐17

31‐May‐17

21‐Jun‐17

21‐Jun‐17

21‐Jun‐17

95%

95%

95%

95%

0%

0%

0.924%

0.040%

0.924%

0.040%

7

PROCESS

3963‐FAHM‐6‐52‐0002

PFD FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ FIRST STAGE SEPARATOR & PWT

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

31‐Oct‐18

5‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

5‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

95%

95%

0%

0.053%

0.053%

11

7

PROCESS

3963‐FAHM‐6‐52‐0003

OT

PFD FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ SEPARATORS SYSTEM

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

12

7

PROCESS

3963‐FAHN‐6‐52‐0001

OT

PFD FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ FIRST STAGE SEPARATOR & PWI

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

14‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

14‐Dec‐17

95%

95%

0%

0.053%

0.053%

13

7

PROCESS

3963‐FAHS‐6‐52‐0001

OT

PFD FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ FIRST STAGE SEPARATOR & PWT

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

14

7

PROCESS

3963‐JALM‐6‐52‐0001

OT

DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ GENERAL, PROCESS FLOW DIAGRAM

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

3963‐JALM‐6‐52‐0002

OT

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

6‐Apr‐17

9‐Apr‐17

95%

95%

0%

0.053%

0.053%

15

7

PROCESS

PFD FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ JALEHA/DIYAB PROD. & FLOW LINES

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

16

7

PROCESS

3963‐JALM‐6‐52‐0003

OT

PFD FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ FIRST STAGE SEPARATORS & PWT

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

17

7

PROCESS

3963‐JALM‐6‐52‐0004

OT

PFD FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ SEPARATION TRAIN

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

18

7

PROCESS

3963‐KAHM‐6‐52‐0001

OT

DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ GENERAL, PROCESS FLOW DIAGRAM

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

19

PROCESS

3963‐KAHM‐6‐52‐0002

OT

PFD FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ FIRST STAGE SEPARATORS

1

A

0.056%

25‐Mar‐17

20

7

PROCESS

3963‐KAHM‐6‐52‐0003

OT

PFD FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ PRODUCED WATER TREATMENT

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

21

7

PROCESS

3963‐KAHN‐6‐52‐0001

OT

DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ GENERAL PROCESS FLOW DIAGRAM

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

22

7

OT

DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ GENERAL PROCESS FLOW DIAGRAM

1

A

0.056%

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

7

PROCESS

3963‐KAHS‐6‐52‐0002

OT

DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ GENERAL PROCESS FLOW DIAGRAM

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

7

PROCESS

3963‐FAHM‐6‐52‐0004

OT

PFD FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION 3 PHASE TEST SEPERATOR, SEPARATOR SYSTEM

1

A

0.069%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.066%

0.066%

3963‐DGEN‐6‐17‐0001

OT

PROCESS SIMULATION & H&MB REPORT

1

A

0.111%

1‐Apr‐17

11‐Apr‐17

16‐Apr‐17

17‐May‐17

7‐Jun‐17

17‐Jun‐17

31‐Oct‐18

10‐Apr‐17

11‐Apr‐17

12‐Apr‐17

21‐Jun‐17

13‐Jul‐17

18‐Jul‐17

10‐Apr‐17

11‐Apr‐17

12‐Apr‐17

21‐Jun‐17

13‐Jul‐17

18‐Jul‐17

95%

95%

0%

0.106%

0.106%

26

7

PROCESS

3963‐DGEN‐6‐12‐0001

OT

3 ‐ PHASE TEST SEPARATOR SIZING CALCULATION 

1

B

0.097%

12‐Apr‐17

22‐Apr‐17

27‐Apr‐17

28‐May‐17

18‐Jun‐17

28‐Jun‐17

31‐Oct‐18

18‐Apr‐17

12‐Jun‐17

13‐Jun‐17

27‐Aug‐17

19‐Sep‐17

20‐Sep‐17

22‐Jul‐19

18‐Apr‐17

12‐Jun‐17

13‐Jun‐17

27‐Aug‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.092%

0.092%

27

7

PROCESS

3963‐DGEN‐6‐00‐0001

OT

PROJECT DRAWING INDEX (PROCESS)

1

1

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

4‐Jun‐17

4‐Jun‐17

2‐Oct‐17

2‐Oct‐17

2‐Oct‐17

22‐Jul‐19

18‐Apr‐17

4‐Jun‐17

4‐Jun‐17

2‐Oct‐17

2‐Oct‐17

2‐Oct‐17

95%

95%

0%

0.053%

0.053%

3963‐DGEN‐6‐50‐0001

OT

28

7

PROCESS

3963‐KAHS‐6‐52‐0001

10‐May‐17

23

7

PROCESS

9‐Apr‐17

24 25

7

4‐Apr‐17

0.053%

PROCESS

22‐Jul‐19

LEGEND, SYMBOLS & ABBREVIATIONS (2 SHEETS)

1

B

0.097%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

4‐May‐17

4‐May‐17

19‐Jun‐17

21‐Aug‐17

21‐Aug‐17

22‐Jul‐19

18‐Apr‐17

4‐May‐17

4‐May‐17

19‐Jun‐17

21‐Aug‐17

21‐Aug‐17

95%

95%

0%

0.092%

0.092%

29

7

PROCESS

3963‐KAHM‐6‐50‐0001

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

3‐Jan‐18

22‐Jul‐19

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

3‐Jan‐18

95%

95%

0%

0.053%

0.053%

30

7

PROCESS

3963‐KAHM‐6‐50‐0002

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 24‐V‐XXX1

1

A

0.083%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

3‐Jan‐18

22‐Jul‐19

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

3‐Jan‐18

95%

95%

0%

0.079%

0.079%

31

7

PROCESS

3963‐KAHM‐6‐50‐0003

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐NEW 3 PHASE TEST SEPARATOR 24‐V‐XXX1

1

A

0.083%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

21‐Jan‐18

22‐Jul‐19

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

21‐Jan‐18

95%

95%

0%

0.079%

32

7

PROCESS

3963‐KAHM‐6‐50‐0005

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ DEGASSING VESSEL 24‐V‐4005

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

15‐Jun‐17

3‐Jan‐18

22‐Jul‐19

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

15‐Jun‐17

3‐Jan‐18

95%

95%

0%

0.053%

0.053%

33

7

PROCESS

3963‐KAHM‐6‐50‐0006

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ GAS GATHERING STATION 

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

3‐Jan‐18

22‐Jul‐19

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

3‐Jan‐18

95%

95%

0%

0.053%

0.053%

34

7

PROCESS

3963‐KAHM‐6‐50‐0007

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ CRUDE OIL FROM KHATIYAH NORTH

1

B

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

3‐May‐17

15‐Jun‐17

11‐Sep‐17

12‐Sep‐17

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

3‐May‐17

15‐Jun‐17

11‐Sep‐17

12‐Sep‐17

35

7

PROCESS

3963‐KAHM‐6‐50‐0008

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ CRUDE OIL FROM KHATIYAH SOUTH

1

B

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

18‐May‐17

15‐Jun‐17

11‐Sep‐17

12‐Sep‐17

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

18‐May‐17

15‐Jun‐17

11‐Sep‐17

12‐Sep‐17

95%

95%

0%

0.053%

0.053%

36

7

PROCESS

3963‐KAHM‐6‐51‐0001

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ DRAIN COLLECTION 

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

3‐May‐17

15‐Jun‐17

15‐Jun‐17

5‐Oct‐17

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

3‐May‐17

15‐Jun‐17

15‐Jun‐17

5‐Oct‐17

95%

95%

0%

0.053%

0.053%

37

7

PROCESS

3963‐KAHM‐6‐51‐0002

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐PROCESS FLARE COLLECTION 

1

B

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

15‐Jun‐17

5‐Oct‐17

22‐Jul‐19

18‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

15‐Jun‐17

5‐Oct‐17

95%

95%

0%

0.053%

0.053%

PROCESS

3963‐KAHM‐6‐51‐0003

OT

15‐Jun‐17

22‐Jul‐19

18‐Apr‐17

30‐Apr‐17

3‐May‐17

38

7

B

3‐Jul‐17

95%

95%

0%

0.053%

0.079%

0.053%

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION

1

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

5‐Oct‐17

15‐Jun‐17

15‐Jun‐17

5‐Oct‐17

95%

95%

0%

0.053%

0.053%

39

7

PROCESS

3963‐KAHN‐6‐50‐0001

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 22‐V‐XXX1

1

A

0.083%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

30‐Apr‐17

3‐May‐17

9‐Jul‐17

26‐Sep‐17

21‐Jan‐18

22‐Jul‐19

18‐Apr‐17

30‐Apr‐17

3‐May‐17

9‐Jul‐17

26‐Sep‐17

21‐Jan‐18

95%

95%

0%

0.079%

0.079%

40

7

PROCESS

3963‐KAHN‐6‐50‐0003

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR CONT. SKID 22‐V‐

1

A

0.083%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

26‐Sep‐17

2‐Jan‐18

22‐Jul‐19

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

26‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

41

7

PROCESS

3963‐KAHN‐6‐50‐0004

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PROD WATER DEGASSING VESSEL 22‐V‐7490

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

22‐Jul‐19

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

95%

95%

0%

0.053%

42

7

PROCESS

3963‐KAHN‐6‐50‐0005

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PROD WATER DEGASSING VESSEL 22‐V‐7495

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

22‐Jul‐19

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

43

7

PROCESS

3963‐KAHN‐6‐50‐0006

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ WET LIFT GAS KO DRUM 22‐V‐4601

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

22‐Jul‐19

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

44

7

PROCESS

3963‐KAHN‐6‐50‐0007

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PIG LAUNCHER 22‐Z‐7020

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

26‐Sep‐17

2‐Jan‐18

22‐Jul‐19

18‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

26‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

45

7

PROCESS

3963‐KAHN‐6‐50‐0008

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEP. CONT. SKID 22‐V‐4002

1

A

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

46

7

PROCESS

3963‐KAHN‐6‐50‐0009

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ FIRST STAGE 3 PHASE SEP. 22‐V‐7480

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

3‐May‐17

22‐Jun‐17

26‐Sep‐17

2‐Jan‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

3‐May‐17

22‐Jun‐17

26‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

47

7

PROCESS

3963‐KAHN‐6‐50‐0010

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES

1

B

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

26‐Sep‐17

2‐Jan‐18

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

26‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

48

7

PROCESS

3963‐KAHN‐6‐51‐0001

OT

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION

1

A

0.056%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.053%

0.053%

49

7

PROCESS

3963‐KAHN‐6‐52‐0002

OT

DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ SEPARATORS SYSTEM PROCESS FLOW DIAGRAM

1

A

0.056%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

20‐Jul‐17

10‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.053%

0.053%

50

7

PROCESS

DEM‐3963‐KAHM‐6‐50‐0001

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES ,P&ID (DEMO

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

2‐Jan‐18

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

2‐Jan‐18

95%

95%

0%

0.040%

0.040%

51

7

PROCESS

DEM‐3963‐KAHM‐6‐50‐0002

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 24‐V‐7900,P&ID (D

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

2‐Jan‐18

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

2‐Jan‐18

95%

95%

0%

0.040%

0.040%

52

7

PROCESS

DEM‐3963‐KAHM‐6‐50‐0003

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 24‐V7900 CTRL SKI

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

2‐Jan‐18

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

2‐Jan‐18

95%

95%

0%

0.040%

0.040%

53

7

PROCESS

DEM‐3963‐KAHM‐6‐50‐0004

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ DEGASSING VESSEL 24‐V‐4005,P&ID (DEMOLI

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

15‐Jun‐17

2‐Jan‐18

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

15‐Jun‐17

2‐Jan‐18

95%

95%

0%

0.040%

0.040%

54

7

PROCESS

DEM‐3963‐KAHM‐6‐51‐0003

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ IA DISTRIBUTION P&ID (DEMOLITION)

1

B

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

24‐Sep‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

24‐Sep‐17

95%

95%

0%

0.040%

0.040%

55

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0001

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 22‐V‐7400 (DEMO

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

24‐Aug‐17

4‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

24‐Aug‐17

4‐Oct‐17

95%

95%

0%

0.040%

0.040%

56

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0002

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR CONT. SKID 22‐V‐

1

B

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.040%

57

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0003

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐3 PHASE TEST SEPARATOR CONT. SKID 22‐V‐7

1

B

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

58

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0004

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PROD WATER DEGASSING VESSEL 22‐V‐7490

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

95%

95%

0%

0.040%

0.040%

59

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0005

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PROD WATER DEGASSING VESSEL 22‐V‐7495

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

95%

95%

0%

0.040%

0.040%

60

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0006

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ WET LIFT GAS KO DRUM 22‐V‐4601 (DEMOL

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

61

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0007

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PIG LAUNCHER 22‐Z‐7020 (DEMOLITION)

1

B

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.040%

62

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0008

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEP. CONT SKID 22‐V‐4002 (D

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

63

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0009

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ FIRST STAGE PHASE SEP. 22‐V‐7480 (DEMOL

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

64

7

PROCESS

DEM‐3963‐KAHN‐6‐50‐0010

DEM

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES (DEMOLITIO

1

B

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

22‐Jul‐19

19‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

PROCESS

DEM‐3963‐KAHN‐6‐51‐0001

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION (DEMOLITI

17‐Apr‐17

27‐Apr‐17

3‐May‐17

22‐Jun‐17

3‐May‐17

65

27‐Apr‐17

22‐Jun‐17

26‐Sep‐17

0.040%

0.040%

1

A

0.042%

22‐Jun‐17

19‐Oct‐17

22‐Jun‐17

22‐Jun‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 14‐V‐XXX1

1

A

0.083%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

21‐Jan‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.079%

0.079%

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

2‐Jan‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

14‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

14‐Jan‐18

95%

95%

0%

0.053%

0.053%

69

7

PROCESS

3963‐FAHM‐6‐50‐0005

OT

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ 3RD STAGE SUCTION KO DRUM 14‐V‐5205,

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

14‐Jan‐18

22‐Jul‐19

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

14‐Jan‐18

95%

95%

0%

0.053%

0.053%

70

7

PROCESS

3963‐FAHM‐6‐50‐0006

OT

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ 3‐PHASE SEPARATOR 14‐V‐4001

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

14‐Jan‐18

22‐Jul‐19

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

14‐Jan‐18

95%

95%

0%

0.053%

0.053%

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ S.D.V & R.V. STATION & DIST. MANIFOLD

1

A

71

3963‐FAHM‐6‐50‐0007

OT

27‐Apr‐17

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

18‐May‐17

2‐Jul‐17

5‐Oct‐17

14‐Jan‐18

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

14‐Jan‐18

7

PROCESS

3963‐FAHM‐6‐51‐0001

OT

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ DRAIN COLLECTION

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

2‐Jan‐18

22‐Jul‐19

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

PROCESS

3963‐FAHM‐6‐51‐0002

OT

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ TANK FLARE COLLECTION

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

2‐Jan‐18

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

PROCESS

3963‐FAHM‐6‐51‐0003

27‐Apr‐17

14‐May‐17

27‐Apr‐17

14‐May‐17

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION

1

A

0.056%

23‐Apr‐17

2‐Jul‐17

2‐Jan‐18

18‐May‐17

2‐Jul‐17

2‐Jul‐17

2‐Jan‐18

PROCESS

3963‐KAHS‐6‐50‐0001

OT

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 23‐V‐XXX1

1

A

0.083%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

21‐Jan‐18

22‐Jul‐19

4‐May‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.079%

0.079%

3963‐KAHS‐6‐50‐0003

OT

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ 3 PHASE SEPARATION HEADERS

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

3‐Jan‐18

22‐Jul‐19

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

3‐Jan‐18

95%

95%

0%

0.053%

0.053%

77

7

PROCESS

3963‐KAHS‐6‐50‐0004

OT

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ DEGASSING VESSEL 23‐V‐7280

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

3‐Jan‐18

22‐Jul‐19

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

3‐Jan‐18

95%

95%

0%

0.053%

0.053%

78

7

PROCESS

3963‐KAHS‐6‐50‐0005

OT

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ HYDROCARBON CONDENSATE LINES

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

3‐Jan‐18

22‐Jul‐19

4‐May‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

3‐Jan‐18

95%

95%

0%

0.053%

0.053%

79

7

PROCESS

3963‐KAHS‐6‐50‐0006

OT

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

3‐Jan‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

3‐Jan‐18

95%

95%

0%

0.053%

0.053%

80

7

PROCESS

3963‐KAHS‐6‐51‐0001

OT

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ DRAIN SYSTEM

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

2‐Jan‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

95%

95%

0%

0.053%

0.053%

23‐Apr‐17

3‐May‐17

8‐May‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

7

PROCESS

3963‐KAHS‐6‐51‐0003

OT

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION

1

A

0.056%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

22‐Jul‐19

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

PROCESS

DEM‐3963‐FAHM‐6‐50‐0001

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐3 PHASE TEST SEPARATOR 14‐V‐1900 (DEMOLIT

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.040%

0.040%

84

7

PROCESS

DEM‐3963‐FAHM‐6‐50‐0002

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐3 PHASE TEST SEPARATOR 14‐V‐1900 CTRL SKID

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.040%

0.040%

85

7

PROCESS

DEM‐3963‐FAHM‐6‐50‐0003

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐HYDROCYCLONE & DEGASSER SKID SHT.2 (DEM

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.040%

86

7

PROCESS

DEM‐3963‐FAHM‐6‐50‐0004

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐GAS & OIL DISTRIBUTION (DEMOLITION)

1

B

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

5‐Oct‐17

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

87

7

PROCESS

DEM‐3963‐FAHM‐6‐50‐0005

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ S.D.V & R.V. STATION & DIST. MANIFOLD (DEM

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

5‐Oct‐17

22‐Jul‐19

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

88

7

PROCESS

DEM‐3963‐FAHM‐6‐51‐0001

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ DRAIN COLLECTION (DEMOLITION)

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

4‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

4‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.040%

0.040%

89

7

PROCESS

DEM‐3963‐FAHM‐6‐51‐0004

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐FLARE COLLECTION (DEMOLITION)

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

27‐Jun‐17

2‐Jul‐17

22‐Jul‐19

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

27‐Jun‐17

2‐Jul‐17

95%

95%

0%

0.040%

0.040%

90

7

PROCESS

DEM‐3963‐FAHM‐6‐51‐0002

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ TANK FLARE COLLECTION (DEMOLITION)

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

27‐Apr‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.040%

0.040%

91

7

PROCESS

DEM‐3963‐FAHM‐6‐51‐0003

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION (DEMOLITION)

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

27‐Sep‐17

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

27‐Sep‐17

95%

95%

0%

0.040%

92

7

PROCESS

DEM‐3963‐KAHS‐6‐51‐0001

DEM

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐DRAIN SYSTEM (DEMOLITION)

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.040%

0.040%

93

7

PROCESS

DEM‐3963‐KAHS‐6‐51‐0003

DEM

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION (DEMOLITIO

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

17‐Jun‐17

22‐Jun‐17

22‐Jul‐19

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

17‐Jun‐17

22‐Jun‐17

95%

95%

0%

0.040%

0.040%

94

7

PROCESS

3963‐FAHM‐6‐51‐0004

OT

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ FLARE COLLECTION

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.040%

0.040%

95

7

PROCESS

3963‐FAHN‐6‐50‐0001

OT

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES

1

B

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

5‐Oct‐17

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.053%

0.053%

96

7

PROCESS

3963‐FAHN‐6‐50‐0002

OT

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐NEW 3 PHASE TEST SEPARATOR 12‐V‐XXX1

1

A

0.083%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

21‐Jan‐18

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

21‐Jan‐18

95%

95%

0%

0.079%

97

7

PROCESS

3963‐FAHN‐6‐50‐0004

OT

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ HYDROCYCLONE & DEGASSER SKID SHT.2

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

2‐Jan‐18

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

98

7

PROCESS

3963‐FAHN‐6‐50‐0005

OT

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐PIG LAUNCHER 12‐Z‐0810

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

2‐Jan‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

99

7

PROCESS

3963‐FAHN‐6‐51‐0001

OT

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐DRAIN SYSTEM

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

2‐Jan‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

14‐May‐17

2‐Jul‐17

26‐Sep‐17

2‐Jan‐18

A

0.056%

22‐Jul‐19

7

1

A

2‐Jul‐17

82

7

1

18‐May‐17

83

100

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ FLARE COLLECTION

31‐Oct‐18

0.053%

PROCESS

OT

9‐Jul‐17

0.053%

7

3963‐KAHS‐6‐51‐0002

29‐Jun‐17

0%

7

PROCESS

8‐Jun‐17

95%

75

7

8‐May‐17

95%

76

81

3‐May‐17

14‐May‐17

22‐Jul‐19

7

OT

4‐May‐17

14‐Jan‐18

72

7

PROCESS

5‐Oct‐17

73 74

7

2‐Jul‐17

5‐Apr‐17

3‐May‐17

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ HYDROCYCLONE & DEGASSER SKID SHT.2

18‐May‐17

2‐Apr‐17

30‐Apr‐17

OT

23‐Apr‐17

22‐Jul‐19

18‐Apr‐17

OT

0.056%

5‐Apr‐17

22‐Jul‐19

3963‐FAHM‐6‐50‐0001

A

2‐Apr‐17

2‐Jan‐18

3963‐FAHM‐6‐50‐0003

1

31‐Oct‐18

26‐Sep‐17

PROCESS

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ GAS & OIL DISTRIBUTION

3‐Jul‐17

22‐Jun‐17

PROCESS

OT

23‐Jun‐17

3‐May‐17

7

3963‐FAHM‐6‐50‐0004

2‐Jun‐17

30‐Apr‐17

7

PROCESS

2‐May‐17

18‐Apr‐17

66

7

DEM

17‐Apr‐17

67 68

7

0.056%

0.053%

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

PROCESS

3963‐FAHN‐6‐51‐0002

OT

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐PROCESS FLARE K.O DRUM 12‐V‐4017

31‐Oct‐18

11‐May‐17

22‐Jul‐19

11‐May‐17

7

PROCESS

3963‐FAHN‐6‐51‐0003

OT

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

25‐Sep‐17

2‐Jan‐18

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

25‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

7

PROCESS

3963‐FAHS‐6‐50‐0001

OT

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

103

7

PROCESS

3963‐FAHS‐6‐50‐0002

OT

31‐Oct‐18

3‐Jul‐17

28‐Sep‐17

4‐Jul‐17

14‐Jul‐17

14‐Jul‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

26‐Sep‐17

2‐Jan‐18

18‐May‐17

95%

95%

0%

0.053%

0.079%

101

13‐Jun‐17

4‐Jul‐17

22‐Jul‐19

0.040%

102

13‐May‐17

13‐Jun‐17

4‐May‐17

0.040%

0.053%

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 13‐V‐XXX1 CT

1

A

0.083%

28‐Apr‐17

8‐May‐17

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

21‐Jan‐18

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

21‐Jan‐18

95%

95%

0%

0.079%

0.079%

104

7

PROCESS

3963‐FAHS‐6‐50‐0004

OT

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ HYDROCYCLONE & DEGASSER SKID SHT. 2

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

105

7

PROCESS

3963‐FAHS‐6‐50‐0005

OT

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ PIG LAUNCHER 13‐Z‐0403

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

106

7

PROCESS

3963‐FAHS‐6‐51‐0001

OT

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐DRAIN SYSTEM

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

107

7

PROCESS

3963‐FAHS‐6‐51‐0002

OT

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐PROCESS FLARE K.O DRUM 13‐V‐4043

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.053%

0.053%

108

7

PROCESS

3963‐FAHS‐6‐51‐0003

OT

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION SYSTEM

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

4‐May‐17

13‐May‐17

14‐May‐17

15‐May‐17

18‐May‐17

18‐May‐17

28‐Sep‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

13‐May‐17

15‐May‐17

18‐May‐17

28‐Sep‐17

2‐Jan‐18

95%

95%

95%

95%

0%

0%

0.053%

0.053%

0.053%

0.053%

109

7

PROCESS

DEM‐3963‐FAHN‐6‐50‐0001

DEM

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES (DEMOLITION

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

110

7

PROCESS

DEM‐3963‐FAHN‐6‐50‐0002

DEM

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐3 PHASE TEST SEPARATOR 12‐V‐0800 (DEMOL

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

111

7

PROCESS

DEM‐3963‐FAHN‐6‐50‐0003

DEM

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐3 PHASE TEST SEPARATOR 12‐V‐0800 CTRL SKI

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

112

7

PROCESS

DEM‐3963‐FAHN‐6‐50‐0004

DEM

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐HYDROCYCLONE & DEGASSER SKID SHT 2 (DEM

1

A

0.056%

8‐May‐17

13‐May‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

113

7

PROCESS

DEM‐3963‐FAHN‐6‐50‐0005

DEM

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ PIG LAUNCHER 12‐Z‐0810 (DEMOLITION)

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

5‐Oct‐17

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

5‐Oct‐17

95%

95%

0%

0.053%

0.053%

114

7

PROCESS

DEM‐3963‐FAHN‐6‐51‐0001

DEM

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ DRAIN SYSTEM (DEMOLITION)

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

115

7

PROCESS

DEM‐3963‐FAHN‐6‐51‐0002

DEM

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐PROCESS FLARE K.O DRUM 12‐V‐4017 (DEMO

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

3‐Jan‐18

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

2‐Jul‐17

3‐Jan‐18

95%

95%

0%

0.053%

0.053%

116

7

PROCESS

DEM‐3963‐FAHN‐6‐51‐0003

DEM

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION (DEMOLITION

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

117

7

PROCESS

DEM‐3963‐FAHS‐6‐50‐0001

DEM

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES (DEMOLITION

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

118

7

PROCESS

DEM‐3963‐FAHS‐6‐50‐0002

DEM

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 13‐V‐400 (DEMOLIT

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

4‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

4‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

119

7

PROCESS

DEM‐3963‐FAHS‐6‐50‐0003

DEM

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEP. 13‐V‐400 CTRL SKID (DEMO

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

120

7

PROCESS

DEM‐3963‐FAHS‐6‐50‐0004

DEM

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ HYDROCYCLONE & DEGASSER SKID SHT 2 (DEM

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

0.053%

121

7

PROCESS

DEM‐3963‐FAHS‐6‐50‐0005

DEM

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ PIG LAUNCHER 13‐Z‐0403 (DEMOLITION)

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

11‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.053%

122

7

PROCESS

DEM‐3963‐FAHS‐6‐51‐0001

DEM

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ DRAIN SYSTEM (DEMOLITION)

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

19‐Sep‐17

20‐Sep‐17

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.053%

0.053%

123

7

PROCESS

DEM‐3963‐FAHS‐6‐51‐0002

DEM

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ PROCESS FLARE K.O DRUM 13‐V‐4043 (DEMO

1

A

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.053%

0.053%

28‐Apr‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

Page 1 of 13

2‐Jul‐17

12‐Jul‐17

17‐Jul‐17

2‐Jul‐17

12‐Jul‐17

Page 72 of 170

0.053%

0.053%

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC DESC

DOC CLASS

ITEM DOC DOC DESC CODE CLASS DEM P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION SYSTEM (DEM 1

CURRENT REVISION CURRENT REVISION A

SHUTD OWN PACKA GE SHUTD OWN

Original BL WV

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100% ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

SEQ

PLIFA

PLIAWH

PLIAFC

PLASBUILT

ACTS

ACTIFA

ACTIAWH

ACTIAFC

124

7

PROCESS

DEM‐3963‐FAHS‐6‐51‐0003

0.056%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

19‐Sep‐17

20‐Sep‐17

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

19‐Sep‐17

20‐Sep‐17

125

7

PROCESS

3963‐JALM‐6‐50‐0003

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

126

7

PROCESS

3963‐JALM‐6‐50‐0004

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ OIL STABILIZATION HEAT EXCH. 31‐E‐4002

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

11‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

11‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ DEGASSER VESSEL 31‐V‐4009

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

7

PROCESS

DOC NO

ITEM CODE

SRN

127

DISCIPLINE

DOC NO

3963‐JALM‐6‐50‐0005

OT

WV

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

PLS

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

3963‐JALM‐6‐50‐0006

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ PRODUCED GAS K.O. POT 31‐V‐5020

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ WET LIFTGAS KO DRUM 31‐V‐4901

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

95%

0%

0.079%

0.053%

3963‐JALM‐6‐50‐0007

4‐May‐17

95%

Actual WF

PROCESS

9‐Jul‐17

2‐Jan‐18

0.053%

PROCESS

15‐Jul‐17

9‐Jul‐17

Plan WF

7

5‐Jul‐17

9‐Jul‐17

ACTIFC

7

14‐Jun‐17

22‐May‐17

ACTD

128

14‐May‐17

20‐May‐17

PLIFC

129

9‐May‐17

4‐May‐17

PLD

0.079%

130

7

PROCESS

3963‐JALM‐6‐50‐0008

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ GAS GATHERING STATION

1

A

0.083%

29‐Apr‐17

131

7

PROCESS

3963‐JALM‐6‐50‐0009

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR MANIFOLD SHUTDOW

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.079%

132

7

PROCESS

3963‐JALM‐6‐51‐0001

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ DRAIN COLLECTION

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

133

7

PROCESS

3963‐JALM‐6‐51‐0002

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐FLARE COLLECTION

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

9‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

11‐Oct‐17

11‐Oct‐17

0.079%

134

7

PROCESS

3963‐JALM‐6‐51‐0003

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

135

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0001

DEM

P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 31‐V‐42 (DEMOLITION

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

11‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

22‐Jul‐19

11‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

95%

95%

0%

0.079%

0.079%

136

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0002

DEM

P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐3 PHASE TEST SEPARATOR 31‐V‐42, CONR. SKID (

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

11‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

27‐Sep‐17

27‐Sep‐17

22‐Jul‐19

11‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

27‐Sep‐17

27‐Sep‐17

95%

95%

0%

0.079%

137

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0003

DEM

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES (DEMOLITION)

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

22‐Jul‐19

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

95%

95%

0%

0.079%

0.079%

138

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0004

DEM

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐OIL STABILIZATION HEAT EXCH. 31‐E‐4002 (DEMO

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

22‐Jul‐19

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

95%

95%

0%

0.079%

0.079%

139

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0005

DEM

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐DEGASSER VESSEL 31‐V4009 (DEMOLITION)

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

22‐Jul‐19

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

95%

95%

0%

0.079%

0.079% 0.053%

0.079%

140

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0006

DEM

P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐PRODUCED GAS KO POT 31‐V5020 (DEMOLITION

1

A

0.056%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

22‐Jul‐19

3‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

95%

95%

0%

0.053%

141

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0007

DEM

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐WET LIFTGAS KO DRUM 31‐V‐4901 (DEMOLITION

1

A

0.056%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

11‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

22‐Jul‐19

11‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

23‐Jul‐17

24‐Jul‐17

95%

95%

0%

0.053%

142

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0008

DEM

P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐GAS GATHERING STATION (DEMOLITION)

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

28‐Sep‐17

2‐Jan‐18

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

28‐Sep‐17

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

143

7

PROCESS

DEM‐3963‐JALM‐6‐50‐0009

DEM

P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐3 PHASE TEST SEPARATOR MANIFOLD SHUT DOW

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

28‐Sep‐17

19‐Oct‐17

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

28‐Sep‐17

19‐Oct‐17

95%

95%

0%

0.079%

0.079%

144

7

PROCESS

DEM‐3963‐JALM‐6‐51‐0003

DEM

P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION (DEMOLITION)

1

A

0.056%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

26‐Jul‐17

27‐Jul‐17

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

26‐Jul‐17

27‐Jul‐17

95%

95%

0%

0.053%

0.053%

11‐May‐17

20‐May‐17

22‐May‐17

11‐May‐17

20‐May‐17

22‐May‐17

145

7

PROCESS

3963‐JALM‐6‐50‐0001

21‐Jan‐18

22‐Jul‐19

146

7

PROCESS

3963‐DGEN‐6‐05‐0001

OT

PROCESS DESCRIPTION

1

A

0.111%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

4‐May‐17

10‐Jun‐17

11‐Jun‐17

18‐Sep‐17

28‐Sep‐17

28‐Sep‐17

22‐Jul‐19

4‐May‐17

10‐Jun‐17

11‐Jun‐17

18‐Sep‐17

28‐Sep‐17

28‐Sep‐17

95%

95%

0%

0.106%

0.106%

147

7

PROCESS

3963‐DGEN‐6‐17‐0002

OT

UTILITY ADEQUACY REPORT

1

A

0.069%

12‐May‐17

22‐May‐17

27‐May‐17

27‐Jun‐17

18‐Jul‐17

28‐Jul‐17

31‐Oct‐18

25‐May‐17

29‐Aug‐17

30‐Aug‐17

27‐Sep‐17

27‐Sep‐17

27‐Sep‐17

22‐Jul‐19

25‐May‐17

29‐Aug‐17

30‐Aug‐17

27‐Sep‐17

27‐Sep‐17

27‐Sep‐17

95%

95%

0%

0.066%

0.066%

0.139%

21‐May‐17

31‐May‐17

31‐Oct‐18

22‐Jul‐19

1

A

0.056%

B

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

6‐Aug‐17

31‐Oct‐18

9‐Jul‐17

9‐Jul‐17

9‐Jul‐17

9‐Jul‐17

21‐Jan‐18

95%

95%

95%

95%

0%

0%

0.053%

0.132%

0.053%

7

PROCESS

5‐Jun‐17

6‐Jul‐17

25‐May‐17

11‐Jul‐17

12‐Jul‐17

3‐Oct‐17

29‐Oct‐17

29‐Oct‐17

25‐May‐17

11‐Jul‐17

12‐Jul‐17

3‐Oct‐17

29‐Oct‐17

29‐Oct‐17

7

PROCESS

3963‐DGEN‐6‐03‐0003

OT

SHUTDOWN AND CHANGEOVER PHILOSOPHY

1

A

0.111%

13‐Jul‐17

25‐Jul‐17

30‐Jul‐17

27‐Aug‐17

11‐Sep‐17

18‐Sep‐17

31‐Oct‐18

8‐Jul‐17

25‐Oct‐17

26‐Oct‐17

26‐Nov‐17

4‐Dec‐17

4‐Dec‐17

22‐Jul‐19

8‐Jul‐17

25‐Oct‐17

26‐Oct‐17

26‐Nov‐17

4‐Dec‐17

4‐Dec‐17

95%

95%

0%

0.106%

0.106%

7

PROCESS

3963‐DGEN‐6‐12‐0002

OT

RELIEF VALVE SIZING CALCULATION

3

A

0.111%

13‐Jun‐17

23‐Jun‐17

28‐Jun‐17

29‐Jul‐17

19‐Aug‐17

29‐Aug‐17

31‐Oct‐18

9‐Jul‐17

7‐Aug‐17

9‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

9‐Jul‐17

7‐Aug‐17

9‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.106%

0.106%

151

7

PROCESS

3963‐DGEN‐6‐12‐0003

OT

BLOWDOWN CALCULATION

1

A

0.097%

3‐Jul‐17

13‐Jul‐17

18‐Jul‐17

18‐Aug‐17

8‐Sep‐17

18‐Sep‐17

31‐Oct‐18

3‐Jul‐17

19‐Aug‐17

22‐Aug‐17

27‐Sep‐17

12‐Oct‐17

12‐Oct‐17

22‐Jul‐19

3‐Jul‐17

19‐Aug‐17

22‐Aug‐17

27‐Sep‐17

12‐Oct‐17

12‐Oct‐17

95%

95%

0%

0.092%

0.092%

3963‐DGEN‐6‐17‐0004

OT

11‐Aug‐17

22‐Jul‐19

11‐Jun‐17

5‐Jun‐17

27‐Jul‐17

15‐Jul‐17

148

PROCESS

OPERATING CONTROL & SAFEGUARDING & SHUTDOWN PHILOSOPHY

1

150

7

OT

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐NEW 3 PHASE TEST SEPARATOR 31‐V‐XXX1

149

152

3963‐DGEN‐6‐03‐0001

OT

0.053%

0.132%

HYDRAULIC ANALYSIS /LINE SIZING CALCULATION REPORT

3

A

0.111%

15‐Jun‐17

20‐Jun‐17

21‐Jul‐17

21‐Aug‐17

31‐Oct‐18

2‐Apr‐17

10‐Jun‐17

11‐Jun‐17

17‐Aug‐17

17‐Aug‐17

17‐Aug‐17

2‐Apr‐17

10‐Jun‐17

17‐Aug‐17

17‐Aug‐17

17‐Aug‐17

95%

95%

0%

0.106%

0.106%

153

7

PROCESS

3963‐DGEN‐6‐22‐0001

OT

STARTUP, SHUTDOWN & OPERATING MANUALS

1

A

0.222%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

20‐Aug‐18

1‐Sep‐18

24‐Dec‐18

31‐Dec‐18

31‐Dec‐18

22‐Jul‐19

27‐Jul‐17

20‐Aug‐18

1‐Sep‐18

40%

40%

0%

0.089%

0.089%

154

7

PROCESS

DEM‐3963‐FAHM‐6‐50‐0006

DEM

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION – THREE PHASE SEPARATOR 14‐V‐4001  (DEMOL

1

A

0.083%

20‐Sep‐17

25‐Sep‐17

30‐Sep‐17

15‐Oct‐17

9‐Nov‐17

29‐Nov‐17

31‐Oct‐18

17‐Sep‐17

18‐Sep‐17

20‐Sep‐17

18‐Dec‐17

2‐Jan‐18

2‐Jan‐18

22‐Jul‐19

17‐Sep‐17

18‐Sep‐17

20‐Sep‐17

18‐Dec‐17

2‐Jan‐18

2‐Jan‐18

95%

95%

0%

0.079%

0.079%

155

7

PROCESS

DEM‐3963‐KAHN‐6‐51‐0002

DEM

P&ID FOR DUKHAN – KHATIYAH NORTH DEGASSING STATION – INSTRUMENT AIR RECEIVER 22‐V‐7330  (DE

1

A

0.083%

20‐Sep‐17

25‐Sep‐17

30‐Sep‐17

15‐Oct‐17

9‐Nov‐17

29‐Nov‐17

31‐Oct‐18

17‐Sep‐17

18‐Sep‐17

20‐Sep‐17

17‐Dec‐17

3‐Jan‐18

3‐Jan‐18

22‐Jul‐19

17‐Sep‐17

18‐Sep‐17

20‐Sep‐17

17‐Dec‐17

3‐Jan‐18

3‐Jan‐18

95%

95%

0%

0.079%

0.079%

156

8

PROCESS

3963‐DGEN‐6‐00‐0002

OT

MISCELLANEOUS ‐ PROCESS

0

0.111%

31‐Aug‐17

6‐Sep‐17

7‐Sep‐17

14‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

12‐Jan‐18

12‐Jan‐18

15‐Jan‐18

8‐Feb‐18

8‐Mar‐18

8‐Mar‐18

22‐Jul‐19

12‐Jan‐18

12‐Jan‐18

15‐Jan‐18

8‐Feb‐18

8‐Mar‐18

8‐Mar‐18

95%

95%

0%

0.106%

157

7

PROCESS

3963‐DGEN‐6‐03‐0002

OT

PRE‐COMMISSIONING, COMMISSIONING PHILOSOPHY

1

0

0.139%

27‐Jun‐17

7‐Jul‐17

12‐Jul‐17

12‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

28‐Jun‐17

22‐Jan‐18

24‐Jan‐18

6‐Aug‐18

24‐Sep‐18

24‐Sep‐18

22‐Jul‐19

28‐Jun‐17

22‐Jan‐18

24‐Jan‐18

6‐Aug‐18

24‐Sep‐18

24‐Sep‐18

95%

95%

0%

0.132%

0.132%

158

7

PROCESS

3963‐DGEN‐6‐17‐0003

OT

FLARE ADEQUACY REPORT

1

A

0.111%

18‐Jun‐17

28‐Jun‐17

3‐Jul‐17

3‐Aug‐17

24‐Aug‐17

3‐Sep‐17

31‐Oct‐18

22‐Jun‐17

16‐Oct‐17

17‐Oct‐17

22‐Jan‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

22‐Jun‐17

16‐Oct‐17

17‐Oct‐17

22‐Jan‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.106%

0.106%

159

7

PROCESS

3963‐KAHM‐6‐50‐0004

OT

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEP.24‐V‐XX1 CTRL SKID

1

B

0.083%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

11‐Mar‐18

22‐Jul‐19

18‐Apr‐17

3‐May‐17

3‐May‐17

15‐Jun‐17

26‐Sep‐17

11‐Mar‐18

95%

95%

0%

0.079%

0.079%

160

7

OT

18‐Apr‐17

18‐Apr‐17

30‐Apr‐17

22‐Jun‐17

PROCESS

3963‐KAHN‐6‐50‐0002

P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 22‐V‐XXX1 CTRL S

1

B

0.083%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

30‐Apr‐17

3‐May‐17

26‐Sep‐17

11‐Mar‐18

22‐Jul‐19

26‐Sep‐17

11‐Mar‐18

95%

95%

0%

0.079%

0.079%

161

7

PROCESS

3963‐FAHM‐6‐50‐0002

OT

P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 14‐V‐XXX1, CTR

1

B

0.083%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

11‐Mar‐18

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

18‐May‐17

2‐Jul‐17

5‐Oct‐17

11‐Mar‐18

95%

95%

0%

0.079%

0.079%

162

7

PROCESS

3963‐KAHS‐6‐50‐0002

OT

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 23‐V‐XXX1 C

1

B

0.083%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

30‐Jan‐18

22‐Jul‐19

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

11‐Oct‐17

30‐Jan‐18

95%

95%

0%

0.079%

0.079%

PROCESS

3963‐FAHN‐6‐50‐0003

OT

P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ 3 PHASE TEST SEP. 12‐V‐XXX1 CTRL SKID

163

7

13‐May‐17

1

B

0.083%

28‐Apr‐17

8‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

18‐May‐17

2‐Jul‐17

11‐Mar‐18

22‐Jul‐19

18‐May‐17

2‐Jul‐17

11‐Mar‐18

95%

95%

0%

0.079%

0.079%

164

7

PROCESS

3963‐FAHS‐6‐33‐0001

OT

LINE DESIGNATION TABLE ‐ FAHAHIL SOUTH DEGASSING STATION

1

A

0.056%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

26‐Sep‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

22‐Jul‐19

1‐Jun‐17

26‐Sep‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

95%

95%

0%

0.053%

0.053%

7

PROCESS

3963‐FAHS‐6‐50‐0003

OT

P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEP. 13‐V‐XXX1 CTRL SKID

1

B

0.083%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

11‐Mar‐18

22‐Jul‐19

3‐May‐17

14‐May‐17

18‐May‐17

3‐Jul‐17

28‐Sep‐17

11‐Mar‐18

95%

95%

0%

0.079%

0.079%

4‐May‐17

14‐May‐17

26‐Sep‐17

3963‐JALM‐6‐50‐0002

OT

3‐May‐17

20‐May‐17

22‐May‐17

3‐May‐17

20‐May‐17

22‐May‐17

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 31‐V‐XXX1, CTRL

1

B

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

9‐Jul‐17

9‐Jul‐17

11‐Mar‐18

22‐Jul‐19

9‐Jul‐17

9‐Jul‐17

11‐Mar‐18

167

7

PROCESS

3963‐DGEN‐6‐30‐0001

OT

EQUIPMENT LIST

1

A

0.097%

6‐May‐17

16‐May‐17

21‐May‐17

21‐Jun‐17

12‐Jul‐17

22‐Jul‐17

31‐Oct‐18

11‐May‐17

4‐Jun‐17

4‐Jun‐17

27‐Jul‐17

28‐Sep‐17

18‐Jan‐18

22‐Jul‐19

11‐May‐17

4‐Jun‐17

4‐Jun‐17

27‐Jul‐17

28‐Sep‐17

18‐Jan‐18

95%

95%

0%

0.092%

0.092%

7

PROCESS

3963‐FAHM‐6‐33‐0001

OT

LINE DESIGNATION TABLE ‐ FAHAHIL MAIN DEGASSING STATION 

1

A

0.111%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

26‐Sep‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

22‐Jul‐19

31‐May‐17

26‐Sep‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

95%

95%

0%

0.106%

0.106%

20‐Jun‐17

21‐Jul‐17

169

7

7

PROCESS

PROCESS

3963‐FAHN‐6‐33‐0001

A

0.069%

5‐Jun‐17

11‐Aug‐17

21‐Aug‐17

26‐Sep‐17

26‐Sep‐17

31‐Oct‐18

7‐Jun‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

22‐Jul‐19

7‐Jun‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

PROCESS

3963‐JALM‐6‐33‐0001

OT

LINE DESIGNATION TABLE ‐ JALEHA MAIN DEGASSING STATION

1

A

0.056%

5‐Jun‐17

15‐Jun‐17

20‐Jun‐17

21‐Jul‐17

11‐Aug‐17

21‐Aug‐17

31‐Oct‐18

7‐Jun‐17

26‐Sep‐17

28‐Sep‐17

14‐Jan‐18

24‐Jan‐18

24‐Jan‐18

22‐Jul‐19

7‐Jun‐17

26‐Sep‐17

28‐Sep‐17

14‐Jan‐18

24‐Jan‐18

24‐Jan‐18

95%

95%

0%

0.053%

0.053%

3963‐KAHM‐6‐33‐0001

OT

LINE DESIGNATION TABLE ‐ KHATIYAH MAIN DEGASSING STATION 

1

A

0.056%

13‐Jun‐17

23‐Jun‐17

28‐Jun‐17

29‐Jul‐17

19‐Aug‐17

29‐Aug‐17

31‐Oct‐18

8‐Jul‐17

26‐Sep‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

22‐Jul‐19

8‐Jul‐17

26‐Sep‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

95%

95%

0%

0.053%

0.053%

95%

7

PROCESS

1

A

0.056%

23‐Jun‐17

28‐Jun‐17

29‐Jul‐17

19‐Aug‐17

29‐Aug‐17

31‐Oct‐18

11‐Jul‐17

26‐Sep‐17

28‐Sep‐17

24‐Jan‐18

24‐Jan‐18

22‐Jul‐19

11‐Jul‐17

26‐Sep‐17

28‐Sep‐17

24‐Jan‐18

24‐Jan‐18

PROCESS

3963‐KAHS‐6‐33‐0001

OT

LINE DESIGNATION TABLE ‐ KHATIYAH SOUTH DEGASSING STATION 

1

A

0.056%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

8‐Jul‐17

26‐Sep‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

22‐Jul‐19

8‐Jul‐17

26‐Sep‐17

28‐Sep‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

95%

95%

0%

0.053%

0.053%

7

PROCESS

DEM‐3963‐KAHM‐6‐50‐0005

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ GAS GATHERING STATION, P&ID (DEMOLITIO

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

5‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

175

7

PROCESS

DEM‐3963‐KAHM‐6‐50‐0006

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR CRUDE OIL FROM K

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

5‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

176

7

PROCESS

DEM‐3963‐KAHM‐6‐51‐0001

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ DRAIN COLLECTION, P&ID (DEMOLITION)

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

5‐Oct‐17

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

177

7

PROCESS

DEM‐3963‐KAHM‐6‐51‐0002

DEM

P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ PROCESS FLARE COLLECTION, P&ID (DEMOLIT

1

A

0.042%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

5‐Oct‐17

22‐Jul‐19

19‐Apr‐17

30‐Apr‐17

3‐May‐17

15‐Jun‐17

24‐Aug‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

178

7

PROCESS

DEM‐3963‐KAHS‐6‐50‐0001

DEM

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 23‐V‐7200 (DEMO

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

22‐Jul‐19

4‐May‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

95%

95%

0%

0.040%

0.040%

179

7

PROCESS

DEM‐3963‐KAHS‐6‐50‐0002

DEM

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR CONTROL SKID 23

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

4‐May‐17

22‐Jul‐19

4‐May‐17

180

7

PROCESS

DEM‐3963‐KAHS‐6‐50‐0003

DEM

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐3 PHASE TEST SEPARATOR HEADERS (DEMOL

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

22‐Jul‐19

2‐Apr‐17

5‐Apr‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

95%

95%

0%

0.040%

0.040%

181

7

PROCESS

DEM‐3963‐KAHS‐6‐50‐0004

DEM

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐DEGASSING VESSEL 23‐V‐7280 (DEMOLITION

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

2‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

22‐Jul‐19

2‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

95%

95%

0%

0.040%

0.040%

182

7

PROCESS

DEM‐3963‐KAHS‐6‐50‐0005

DEM

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐HYDROCARBON CONDENSATE LINES (DEMOL

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

22‐Jul‐19

27‐Apr‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

95%

95%

0%

0.040%

0.040%

183

7

PROCESS

DEM‐3963‐KAHS‐6‐50‐0006

DEM

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES (DEMOLITIO

23‐Apr‐17

3‐May‐17

8‐May‐17

22‐Jul‐19

95%

8‐Jun‐17

29‐Jun‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

22‐Jun‐17

29‐Nov‐17

P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐FLARE COLLECTION (DEMOLITION)

1

A

0.042%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

24‐Aug‐17

29‐Nov‐17

22‐Jul‐19

4‐May‐17

9‐May‐17

10‐May‐17

22‐Jun‐17

24‐Aug‐17

29‐Nov‐17

95%

95%

0%

0.040%

0.040%

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐DRAIN COLLECTION (DEMOLITION)

1

A

0.083%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

15‐Oct‐17

29‐Nov‐17

22‐Jul‐19

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

15‐Oct‐17

29‐Nov‐17

95%

95%

0%

0.079%

0.079%

PROCESS

DEM‐3963‐JALM‐6‐51‐0002

14‐May‐17

29‐Nov‐17

29‐Nov‐17

P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐FLARE COLLECTION (DEMOLITION)

1

A

0.083%

29‐Apr‐17

9‐May‐17

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

15‐Oct‐17

4‐May‐17

20‐May‐17

22‐May‐17

9‐Jul‐17

15‐Oct‐17

187

8

PIPING

3963‐DGEN‐5‐14‐0001

OT

DUKHAN FIELD; PIPING MATERIAL SPECIFICATIONS

1

A

0.140%

13‐Apr‐17

23‐Apr‐17

28‐Apr‐17

29‐May‐17

19‐Jun‐17

29‐Jun‐17

31‐Oct‐18

19‐Apr‐17

27‐May‐17

28‐May‐17

20‐Aug‐17

30‐Aug‐17

8‐Oct‐17

22‐Jul‐19

19‐Apr‐17

27‐May‐17

28‐May‐17

20‐Aug‐17

30‐Aug‐17

8‐Oct‐17

95%

95%

0%

0.133%

0.133%

8

PIPING

3963‐DGEN‐5‐14‐0002

OT

DUKHAN FIELD; TECHNICAL SPECIFICATION FOR PIPING STRESS ANALYSIS

1

A

0.084%

10‐Apr‐17

20‐Apr‐17

25‐Apr‐17

26‐May‐17

16‐Jun‐17

26‐Jun‐17

31‐Oct‐18

29‐Mar‐17

29‐Mar‐17

19‐Apr‐17

25‐May‐17

11‐Jun‐17

11‐Jun‐17

22‐Jul‐19

29‐Mar‐17

29‐Mar‐17

19‐Apr‐17

25‐May‐17

11‐Jun‐17

11‐Jun‐17

95%

95%

0%

0.080%

0.080%

1

A

21‐May‐17

11‐Jun‐17

21‐Jun‐17

31‐Oct‐18

5‐Apr‐17

24‐Apr‐17

27‐Apr‐17

11‐Jul‐17

12‐Jul‐17

13‐Jul‐17

22‐Jul‐19

5‐Apr‐17

24‐Apr‐17

27‐Apr‐17

11‐Jul‐17

12‐Jul‐17

13‐Jul‐17

95%

95%

0%

0.080%

0.080%

190

8

PIPING

3963‐DGEN‐5‐14‐0005

OT

DUKHAN FIELD; TECHNICAL SPECIFICATION FOR FITTINGS & FLANGES

1

A

0.084%

5‐Apr‐17

15‐Apr‐17

20‐Apr‐17

21‐May‐17

11‐Jun‐17

21‐Jun‐17

31‐Oct‐18

29‐Mar‐17

24‐Apr‐17

27‐Apr‐17

20‐Jun‐17

20‐Jun‐17

20‐Jun‐17

22‐Jul‐19

29‐Mar‐17

24‐Apr‐17

27‐Apr‐17

20‐Jun‐17

20‐Jun‐17

20‐Jun‐17

95%

95%

0%

0.080%

0.080%

8

PIPING

3963‐DGEN‐5‐14‐0006

OT

DUKHAN FIELD; TECHNICAL SPECIFICATION FOR MANUAL VALVES 

1

B

0.084%

1‐Apr‐17

11‐Apr‐17

16‐Apr‐17

17‐May‐17

7‐Jun‐17

17‐Jun‐17

31‐Oct‐18

5‐Apr‐17

16‐Apr‐17

19‐Apr‐17

13‐Jun‐17

13‐Jun‐17

13‐Jun‐17

22‐Jul‐19

5‐Apr‐17

16‐Apr‐17

19‐Apr‐17

13‐Jun‐17

13‐Jun‐17

13‐Jun‐17

95%

95%

0%

0.080%

192

8

PIPING

3963‐DGEN‐5‐13‐0001

OT

DUKHAN FIELD; DATA SHEETS FOR BALL VALVES

1

B

0.168%

5‐Mar‐17

10‐Mar‐17

14‐Mar‐17

14‐Apr‐17

5‐May‐17

15‐May‐17

31‐Oct‐18

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

1‐May‐17

7‐Jun‐17

7‐Jun‐17

22‐Jul‐19

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

1‐May‐17

7‐Jun‐17

7‐Jun‐17

95%

95%

0%

0.160%

0.160%

193

8

PIPING

3963‐DGEN‐5‐13‐0002

OT

DUKHAN FIELD; DATA SHEET FOR GATE VALVES

1

A

0.112%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

20‐Apr‐17

16‐May‐17

16‐May‐17

5‐Jun‐17

21‐Jun‐17

21‐Jun‐17

22‐Jul‐19

20‐Apr‐17

16‐May‐17

16‐May‐17

5‐Jun‐17

21‐Jun‐17

21‐Jun‐17

95%

95%

0%

0.106%

0.106%

194

8

PIPING

3963‐DGEN‐5‐13‐0003

OT

DUKHAN FIELD; DATA SHEET FOR GLOBE VALVES

1

A

0.112%

20‐Apr‐17

30‐Apr‐17

5‐May‐17

5‐Jun‐17

26‐Jun‐17

6‐Jul‐17

31‐Oct‐18

19‐Apr‐17

19‐May‐17

21‐May‐17

13‐Jun‐17

11‐Jul‐17

12‐Jul‐17

22‐Jul‐19

19‐Apr‐17

19‐May‐17

21‐May‐17

13‐Jun‐17

11‐Jul‐17

12‐Jul‐17

95%

95%

0%

0.106%

0.106%

195

8

PIPING

3963‐DGEN‐5‐13‐0004

DUKHAN FIELD; DATA SHEET FOR CHECK VALVES

1

B

0.112%

25‐Apr‐17

5‐May‐17

10‐May‐17

20‐Apr‐17

19‐May‐17

21‐May‐17

13‐Jun‐17

20‐Apr‐17

19‐May‐17

21‐May‐17

13‐Jun‐17

23‐Jul‐17

95%

95%

0%

0.106%

0.106%

196

8

PIPING

3963‐DGEN‐5‐13‐0005

OT

DUKHAN FIELD; DATA SHEET FOR NEEDLE VALVES

1

A

0.084%

30‐Apr‐17

10‐May‐17

15‐May‐17

15‐Jun‐17

6‐Jul‐17

16‐Jul‐17

31‐Oct‐18

5‐Apr‐17

30‐May‐17

31‐May‐17

21‐Jun‐17

12‐Jul‐17

13‐Jul‐17

22‐Jul‐19

5‐Apr‐17

30‐May‐17

31‐May‐17

21‐Jun‐17

12‐Jul‐17

13‐Jul‐17

95%

95%

0%

0.080%

0.080%

197

8

PIPING

3963‐DGEN‐5‐13‐0006

OT

DUKHAN FIELD; DATASHEET FOR CORROSION COUPON & CORROSION PROBES

1

A

0.112%

10‐May‐17

20‐May‐17

25‐May‐17

25‐Jun‐17

16‐Jul‐17

26‐Jul‐17

31‐Oct‐18

11‐May‐17

8‐Jun‐17

8‐Jun‐17

25‐Jul‐17

25‐Jul‐17

14‐Sep‐17

22‐Jul‐19

11‐May‐17

8‐Jun‐17

8‐Jun‐17

25‐Jul‐17

25‐Jul‐17

14‐Sep‐17

95%

95%

0%

0.106%

0.106%

198

8

PIPING

3963‐DGEN‐5‐15‐0001

OT

DUKHAN FIELD; MATERIAL REQUISITION FOR MANUAL VALVES (GATE, GLOBE & CHECK)

1

A

0.070%

22‐May‐17

1‐Jun‐17

6‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

25‐May‐17

6‐Jun‐17

6‐Jun‐17

11‐Jul‐17

15‐Jul‐17

20‐Jul‐17

22‐Jul‐19

25‐May‐17

6‐Jun‐17

6‐Jun‐17

11‐Jul‐17

15‐Jul‐17

20‐Jul‐17

95%

95%

0%

0.067%

0.067%

199

8

PIPING

3963‐DGEN‐5‐15‐0002

OT

DUKHAN FIELD; MATERIAL REQUISITION FOR PIPING BULK ITEMS 

1

A

0.070%

3‐Jun‐17

13‐Jun‐17

18‐Jun‐17

19‐Jul‐17

9‐Aug‐17

19‐Aug‐17

31‐Oct‐18

7‐Jun‐17

12‐Jul‐17

13‐Jul‐17

1‐Aug‐17

10‐Aug‐17

10‐Aug‐17

22‐Jul‐19

7‐Jun‐17

12‐Jul‐17

13‐Jul‐17

1‐Aug‐17

10‐Aug‐17

10‐Aug‐17

95%

95%

0%

0.067%

0.067%

200

8

PIPING

3963‐DGEN‐5‐15‐0003

OT

DUKHAN FIELD; MATERIAL REQUISITIONS FOR BALL VALVES

1

A

0.070%

26‐May‐17

5‐Jun‐17

10‐Jun‐17

11‐Jul‐17

1‐Aug‐17

11‐Aug‐17

31‐Oct‐18

31‐May‐17

6‐Jun‐17

6‐Jun‐17

11‐Jul‐17

15‐Jul‐17

20‐Jul‐17

22‐Jul‐19

31‐May‐17

6‐Jun‐17

6‐Jun‐17

11‐Jul‐17

15‐Jul‐17

20‐Jul‐17

95%

95%

0%

0.067%

0.067%

201

8

PIPING

3963‐DGEN‐5‐15‐0004

OT

DUKHAN FIELD; MATERIAL REQUISITION FOR PIPING SPECIALTY ITEMS (STRAINERS, SAMPLING, CORROSIO

1

A

0.070%

29‐May‐17

8‐Jun‐17

13‐Jun‐17

14‐Jul‐17

4‐Aug‐17

14‐Aug‐17

31‐Oct‐18

31‐May‐17

30‐Jul‐17

31‐Jul‐17

2‐Oct‐17

18‐Oct‐17

19‐Oct‐17

22‐Jul‐19

31‐May‐17

30‐Jul‐17

31‐Jul‐17

2‐Oct‐17

18‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.067%

0.067%

202

8

PIPING

3963‐DGEN‐5‐17‐0001

OT

DUKHAN FIELD; TECHNICAL BID EVALUATION FOR MANUAL VALVES (GATE, GLOBE & CHECK)

1

A

0.252%

17‐Jul‐17

27‐Jul‐17

1‐Aug‐17

18‐Aug‐17

28‐Aug‐17

6‐Sep‐17

31‐Oct‐18

20‐Jul‐17

24‐Oct‐17

26‐Oct‐17

19‐Nov‐17

28‐Nov‐17

28‐Nov‐17

22‐Jul‐19

20‐Jul‐17

24‐Oct‐17

26‐Oct‐17

19‐Nov‐17

28‐Nov‐17

28‐Nov‐17

95%

95%

0%

0.240%

0.240%

203

8

PIPING

3963‐DGEN‐5‐17‐0003

OT

DUKHAN FIELD; TECHNICAL BID EVALUATION FOR BALL VALVES

1

A

0.224%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

24‐Oct‐17

26‐Oct‐17

21‐Nov‐17

5‐Dec‐17

5‐Dec‐17

22‐Jul‐19

27‐Jul‐17

24‐Oct‐17

26‐Oct‐17

21‐Nov‐17

5‐Dec‐17

5‐Dec‐17

95%

95%

0%

0.213%

0.213%

A

0.224%

23‐Nov‐17

23‐Nov‐17

8

PIPING

3963‐DGEN‐5‐14‐0004

OT

OT

OT

DUKHAN FIELD; TECHNICAL SPECIFICATION FOR PIPES

0.084%

5‐Apr‐17

15‐Apr‐17

20‐Apr‐17

0.079%

191

204

8

0.079%

0.040%

188 189

0%

0.040%

0.040%

DEM

95%

0%

0.040%

DEM

95%

95%

0%

DEM‐3963‐KAHS‐6‐51‐0002

22‐Jul‐19

4‐May‐17

95%

DEM‐3963‐JALM‐6‐51‐0001

31‐Oct‐18

29‐Nov‐17

95%

PROCESS

15‐Jul‐17

4‐May‐17

29‐Nov‐17

PROCESS

5‐Jul‐17

31‐Oct‐18

22‐Jun‐17

7

14‐Jun‐17

9‐Jul‐17

22‐Jun‐17

7

DEM

0.042%

10‐May‐17

184

7

A

9‐May‐17

0.053%

185 186

1

29‐Nov‐17

0.053%

0.066%

7

22‐Jun‐17

0%

0.066%

172

22‐Jun‐17

95%

0%

174

10‐May‐17

95%

95%

173

9‐May‐17

14‐Jan‐18

24‐Jan‐18

0.079%

PROCESS

14‐Jan‐18

24‐Jan‐18

0.079%

7

13‐Jun‐17

15‐Jun‐17

0%

7

LINE DESIGNATION TABLE ‐ KHATIYAH NORTH DEGASSING STATION 

1

95%

170

OT

LINE DESIGNATION TABLE ‐ FAHAHIL NORTH DEGASSING STATION 

95%

171

3963‐KAHN‐6‐33‐0001

OT

31‐Oct‐18

26‐Sep‐17

168

166

15‐Jul‐17

14‐May‐17

3‐May‐17

165

5‐Jul‐17

4‐May‐17

22‐Jun‐17

0.106%

10‐Jun‐17

1‐Jul‐17

11‐Jul‐17

31‐Oct‐18

22‐Jul‐17

22‐Jul‐19

22‐Jul‐17

PIPING

3963‐DGEN‐5‐17‐0004

DUKHAN FIELD; TECHNICAL BID EVALUATION FOR PIPING SPECIALTY ITEMS (STRAINERS, SAMPLING, CORR

1

10‐Aug‐17

20‐Aug‐17

25‐Aug‐17

12‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

21‐Oct‐17

23‐Oct‐17

3‐Dec‐17

22‐Jul‐19

19‐Oct‐17

21‐Oct‐17

23‐Oct‐17

205

8

PIPING

3963‐DGEN‐5‐36‐0001

ET

DUKHAN FIELD; EARLY TIE‐IN PACKAGE

1

C

0.070%

5‐Mar‐17

10‐Mar‐17

14‐Mar‐17

14‐Apr‐17

5‐May‐17

15‐May‐17

31‐Oct‐18

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

15‐Jun‐17

12‐Jul‐17

13‐Jul‐17

22‐Jul‐19

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

15‐Jun‐17

12‐Jul‐17

13‐Jul‐17

95%

95%

0%

0.067%

0.067%

206

8

PIPING

3963‐FAHN‐5‐33‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; CRITICAL LINE LIST

1

A

0.042%

16‐Jun‐17

26‐Jun‐17

1‐Jul‐17

1‐Aug‐17

22‐Aug‐17

1‐Sep‐17

31‐Oct‐18

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

20‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

20‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.040%

0.040%

1

A

0.028%

16‐Aug‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

18‐Aug‐17

95%

0.027%

Y

7‐Dec‐17

23‐Jul‐17

7‐Dec‐17

3‐Dec‐17

95%

95%

0%

0.213%

0.080%

0.213%

207

8

PIPING

3963‐FAHN‐5‐32‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

31‐Oct‐18

1‐Jun‐17

30‐Jul‐17

31‐Jul‐17

22‐Jul‐19

1‐Jun‐17

30‐Jul‐17

31‐Jul‐17

27‐Aug‐17

29‐Aug‐17

95%

0%

0.027%

208

8

PIPING

3963‐FAHN‐5‐21‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE

3

0

0.168%

15‐Aug‐17

25‐Aug‐17

30‐Aug‐17

13‐Sep‐17

18‐Sep‐17

18‐Sep‐17

31‐Oct‐18

19‐Oct‐17

12‐Mar‐18

14‐Mar‐18

8‐Sep‐18

2‐Dec‐18

2‐Dec‐18

22‐Jul‐19

19‐Oct‐17

12‐Mar‐18

14‐Mar‐18

8‐Sep‐18

65%

65%

0%

0.109%

209

8

PIPING

3963‐FAHN‐5‐31‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS

3

A

0.280%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

22‐Jul‐19

1‐Jun‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

95%

95%

0%

0.266%

0.266%

210

8

PIPING

3963‐FAHN‐5‐17‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT

3

A

0.420%

16‐Jun‐17

26‐Jun‐17

1‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Jul‐17

31‐Oct‐18

21‐Jun‐17

25‐Sep‐17

27‐Sep‐17

16‐Oct‐17

29‐Oct‐17

7‐Feb‐18

22‐Jul‐19

21‐Jun‐17

25‐Sep‐17

27‐Sep‐17

16‐Oct‐17

29‐Oct‐17

7‐Feb‐18

95%

95%

0%

0.399%

0.399%

211

8

PIPING

3963‐FAHN‐5‐52‐0003

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.3 PIPING GA EL.21.600 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

8‐Dec‐17

10‐Dec‐17

12‐Feb‐18

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

19‐Oct‐17

8‐Dec‐17

10‐Dec‐17

12‐Feb‐18

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.093%

0.093%

212

8

PIPING

3963‐FAHN‐5‐52‐0004

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.4 PIPING GA EL.21.600 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.093%

0.093%

213

8

PIPING

3963‐FAHN‐5‐52‐0005

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.5 PIPING GA EL.21.600 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.093%

0.093%

214

8

PIPING

3963‐FAHN‐5‐52‐0006

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.6 PIPING GA EL.22.620 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.093%

0.093%

215

8

PIPING

3963‐FAHN‐5‐52‐0007

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.7 PIPING GA EL.22.620 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

11‐Feb‐18

11‐Feb‐18

22‐Jul‐19

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

11‐Feb‐18

11‐Feb‐18

95%

95%

0%

0.093%

0.093%

216

8

PIPING

3963‐FAHN‐5‐52‐0008

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.8 PIPING GA EL.22.620 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

11‐Feb‐18

11‐Feb‐18

22‐Jul‐19

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

11‐Feb‐18

11‐Feb‐18

95%

95%

0%

0.093%

0.093%

217

8

PIPING

3963‐FAHN‐5‐52‐0009

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.9 PIPING GA EL.22.620 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

11‐Feb‐18

11‐Feb‐18

22‐Jul‐19

19‐Oct‐17

30‐Oct‐17

31‐Oct‐17

15‐Nov‐17

11‐Feb‐18

11‐Feb‐18

95%

95%

0%

0.093%

0.093%

218

8

PIPING

3963‐FAHN‐5‐52‐0010

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.10 PIPING GA EL.22.620 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

1‐Nov‐17

20‐Nov‐17

11‐Feb‐18

11‐Feb‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

1‐Nov‐17

20‐Nov‐17

11‐Feb‐18

11‐Feb‐18

95%

95%

0%

0.093%

0.093%

219

8

PIPING

3963‐FAHN‐5‐52‐0011

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.11 PIPING GA EL.22.620 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

1‐Nov‐17

16‐Nov‐17

16‐Nov‐17

20‐Nov‐17

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

1‐Nov‐17

16‐Nov‐17

16‐Nov‐17

20‐Nov‐17

95%

95%

0%

0.093%

220

8

PIPING

3963‐FAHS‐5‐33‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; CRITICAL LINE LIST 

1

B

0.042%

16‐Jun‐17

26‐Jun‐17

1‐Jul‐17

1‐Aug‐17

22‐Aug‐17

1‐Sep‐17

31‐Oct‐18

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

23‐Aug‐17

13‐Sep‐17

14‐Sep‐17

22‐Jul‐19

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

23‐Aug‐17

13‐Sep‐17

14‐Sep‐17

95%

95%

0%

0.040%

0.040%

221

8

PIPING

3963‐FAHS‐5‐32‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST 

1

A

0.028%

28‐May‐17

7‐Jun‐17

12‐Jun‐17

13‐Jul‐17

3‐Aug‐17

13‐Aug‐17

31‐Oct‐18

1‐Jun‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

1‐Jun‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.027%

0.027%

222

8

PIPING

3963‐FAHS‐5‐36‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING TIE‐IN SCHEDULE 

1

A

0.056%

24‐Jul‐17

3‐Aug‐17

8‐Aug‐17

26‐Aug‐17

5‐Sep‐17

15‐Sep‐17

31‐Oct‐18

16‐Jul‐17

17‐Jul‐17

18‐Jul‐17

14‐Nov‐17

28‐Nov‐17

28‐Nov‐17

22‐Jul‐19

16‐Jul‐17

17‐Jul‐17

18‐Jul‐17

14‐Nov‐17

28‐Nov‐17

28‐Nov‐17

95%

95%

0%

0.053%

0.053%

0.168%

8‐Sep‐17

31‐Oct‐18

22‐Jul‐19

223

8

PIPING

3963‐FAHS‐5‐21‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE 

3

A

2‐Dec‐18

2‐Dec‐18

65%

65%

0%

0.109%

0.109%

0.093%

10‐Aug‐17

20‐Aug‐17

25‐Aug‐17

13‐Sep‐17

13‐Sep‐17

19‐Oct‐17

20‐Mar‐18

22‐Mar‐18

30‐Aug‐18

19‐Oct‐17

20‐Mar‐18

22‐Mar‐18

30‐Aug‐18

224

8

PIPING

3963‐FAHS‐5‐31‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS

3

A

0.336%

2‐Jun‐17

12‐Jun‐17

17‐Jun‐17

18‐Jul‐17

8‐Aug‐17

18‐Aug‐17

31‐Oct‐18

7‐Jun‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

22‐Jul‐19

7‐Jun‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

95%

95%

0%

0.319%

0.319%

225

8

PIPING

3963‐FAHS‐5‐17‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT

3

A

0.420%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

24‐Jul‐17

29‐Jul‐17

29‐Jul‐17

31‐Oct‐18

29‐Jun‐17

3‐Oct‐17

5‐Oct‐17

23‐Oct‐17

23‐Oct‐17

14‐Feb‐18

22‐Jul‐19

29‐Jun‐17

3‐Oct‐17

5‐Oct‐17

23‐Oct‐17

23‐Oct‐17

14‐Feb‐18

95%

95%

0%

0.399%

0.399%

0.109%

226

8

PIPING

3963‐FAHS‐5‐50‐0002

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; KEY PLAN

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

26‐Nov‐17

22‐Jul‐19

27‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

26‐Nov‐17

95%

95%

0%

0.040%

0.040%

227

8

PIPING

3963‐FAHS‐5‐52‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.1 EL. 54.364 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

2‐Nov‐17

2‐Nov‐17

2‐Nov‐17

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

2‐Nov‐17

2‐Nov‐17

2‐Nov‐17

95%

95%

0%

0.093%

0.093%

228

8

PIPING

3963‐FAHS‐5‐52‐0002

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.2 EL. 54.364 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

19‐Oct‐17

30‐Oct‐17

1‐Nov‐17

1‐Nov‐17

1‐Nov‐17

20‐Nov‐17

22‐Jul‐19

19‐Oct‐17

30‐Oct‐17

1‐Nov‐17

1‐Nov‐17

1‐Nov‐17

20‐Nov‐17

95%

95%

0%

0.093%

0.093%

229

8

PIPING

3963‐FAHS‐5‐52‐0003

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.3 EL. 54.364 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

2‐Nov‐17

2‐Nov‐17

2‐Nov‐17

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

2‐Nov‐17

2‐Nov‐17

2‐Nov‐17

95%

95%

0%

0.093%

0.093%

230

8

PIPING

3963‐FAHS‐5‐52‐0004

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.4 EL. 54.364 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

18‐Feb‐18

18‐Feb‐18

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

18‐Feb‐18

18‐Feb‐18

95%

95%

0%

0.093%

0.093%

231

8

PIPING

3963‐FAHS‐5‐52‐0005

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.5 EL. 54.700 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

19‐Feb‐18

19‐Feb‐18

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

19‐Feb‐18

19‐Feb‐18

95%

95%

0%

0.093%

0.093%

232

8

PIPING

3963‐FAHS‐5‐52‐0006

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.6 EL. 54.700 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

30‐Oct‐17

30‐Oct‐17

18‐Feb‐18

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

30‐Oct‐17

30‐Oct‐17

18‐Feb‐18

95%

95%

0%

0.093%

0.093%

233

8

PIPING

3963‐FAHS‐5‐52‐0007

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.7 EL. 54.470 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

18‐Feb‐18

18‐Feb‐18

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

18‐Feb‐18

18‐Feb‐18

95%

95%

0%

0.093%

0.093%

234

8

PIPING

3963‐FAHS‐5‐52‐0008

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.8 EL. 54.470 & ABOVE 

1

1

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

19‐Oct‐17

15‐Dec‐17

17‐Dec‐17

25‐Feb‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

19‐Oct‐17

15‐Dec‐17

17‐Dec‐17

25‐Feb‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.093%

0.093%

235

8

PIPING

3963‐FAHS‐5‐52‐0009

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.9 EL. 54.470 TO 58.470 

1

1

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

19‐Oct‐17

18‐Dec‐17

21‐Dec‐17

18‐Feb‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

19‐Oct‐17

18‐Dec‐17

21‐Dec‐17

18‐Feb‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.093%

0.093%

236

8

PIPING

3963‐FAHS‐5‐52‐0010

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.10 EL. 54.364 & ABOVE 

1

1

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

19‐Oct‐17

18‐Dec‐17

20‐Dec‐17

21‐Feb‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

19‐Oct‐17

18‐Dec‐17

20‐Dec‐17

21‐Feb‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.093%

0.093%

237

8

PIPING

3963‐FAHS‐5‐52‐0011

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.11 EL. 54.364 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

25‐Feb‐18

25‐Feb‐18

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

25‐Feb‐18

25‐Feb‐18

95%

95%

0%

0.093%

0.093%

238

8

PIPING

3963‐FAHS‐5‐52‐0012

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.12 EL. 54.364 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

25‐Feb‐18

25‐Feb‐18

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

25‐Feb‐18

25‐Feb‐18

95%

95%

0%

0.093%

0.093%

239

8

PIPING

3963‐FAHS‐5‐52‐0013

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.13 EL. 54.364 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

25‐Feb‐18

25‐Feb‐18

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

25‐Feb‐18

25‐Feb‐18

95%

95%

0%

0.093%

240

8

PIPING

3963‐FAHS‐5‐52‐0014

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.14 EL. 54.364 & ABOVE 

1

A

0.098%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

25‐Feb‐18

25‐Feb‐18

22‐Jul‐19

12‐Oct‐17

15‐Oct‐17

16‐Oct‐17

19‐Nov‐17

25‐Feb‐18

25‐Feb‐18

95%

95%

0%

0.093%

0.093%

241

8

PIPING

3963‐JALM‐5‐33‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; CRITICAL LINE LIST

1

B

0.042%

16‐Jun‐17

26‐Jun‐17

1‐Jul‐17

1‐Aug‐17

22‐Aug‐17

1‐Sep‐17

31‐Oct‐18

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

23‐Aug‐17

13‐Sep‐17

14‐Sep‐17

22‐Jul‐19

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

23‐Aug‐17

13‐Sep‐17

14‐Sep‐17

95%

95%

0%

0.040%

0.040%

242

8

PIPING

3963‐JALM‐5‐32‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST

1

A

0.028%

5‐Jun‐17

15‐Jun‐17

20‐Jun‐17

21‐Jul‐17

11‐Aug‐17

21‐Aug‐17

31‐Oct‐18

7‐Jun‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

7‐Jun‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.027%

0.027%

1

A

28‐Nov‐17

10‐Dec‐17

28‐Nov‐17

95%

13‐Sep‐17

0.093%

243

8

PIPING

3963‐JALM‐5‐36‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING TIE‐IN SCHEDULE

0.056%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

16‐Sep‐17

31‐Oct‐18

4‐Aug‐17

6‐Aug‐17

8‐Aug‐17

10‐Dec‐17

22‐Jul‐19

4‐Aug‐17

6‐Aug‐17

8‐Aug‐17

10‐Dec‐17

10‐Dec‐17

95%

0%

0.053%

0.053%

244

8

PIPING

3963‐JALM‐5‐21‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE

3

A

0.168%

15‐Aug‐17

25‐Aug‐17

30‐Aug‐17

13‐Sep‐17

18‐Sep‐17

18‐Sep‐17

31‐Oct‐18

19‐Oct‐17

20‐Mar‐18

22‐Mar‐18

8‐Sep‐18

2‐Dec‐18

2‐Dec‐18

22‐Jul‐19

19‐Oct‐17

20‐Mar‐18

22‐Mar‐18

8‐Sep‐18

65%

65%

0%

0.109%

0.109%

245

8

PIPING

3963‐JALM‐5‐31‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS

3

A

0.336%

5‐Jun‐17

15‐Jun‐17

20‐Jun‐17

21‐Jul‐17

11‐Aug‐17

21‐Aug‐17

31‐Oct‐18

7‐Jun‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

22‐Jul‐19

7‐Jun‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

95%

95%

0%

0.319%

246

8

PIPING

3963‐JALM‐5‐17‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT

3

A

0.420%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

3‐Aug‐17

8‐Aug‐17

8‐Aug‐17

31‐Oct‐18

3‐Jul‐17

11‐Oct‐17

12‐Oct‐17

2‐Jan‐18

26‐Feb‐18

26‐Feb‐18

22‐Jul‐19

3‐Jul‐17

11‐Oct‐17

12‐Oct‐17

2‐Jan‐18

26‐Feb‐18

26‐Feb‐18

95%

95%

0%

0.399%

0.399%

247

8

PIPING

3963‐JALM‐5‐50‐0002

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; KEY PLAN

1

A

0.042%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

1‐Aug‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

26‐Nov‐17

22‐Jul‐19

1‐Aug‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

26‐Nov‐17

95%

95%

0%

0.040%

0.040%

Page 2 of 13

Page 73 of 170

0.319%

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC NO

ITEM CODE

DOC DESC

DOC CLASS

CURRENT REVISION

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100%

ACTIAFC

ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

WV

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

248

8

PIPING

3963‐JALM‐5‐52‐0003

0.140%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

5‐Jan‐18

7‐Jan‐18

4‐Mar‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

8‐Jul‐17

5‐Jan‐18

7‐Jan‐18

4‐Mar‐18

22‐Mar‐18

22‐Mar‐18

249

8

PIPING

3963‐JALM‐5‐52‐0004

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.4 EL.63.000 & ABOVE 

1

1

0.084%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

11‐Jul‐17

26‐Dec‐17

28‐Dec‐17

4‐Mar‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

11‐Jul‐17

26‐Dec‐17

28‐Dec‐17

4‐Mar‐18

22‐Mar‐18

22‐Mar‐18

95%

95%

0%

0.080%

250

8

PIPING

3963‐JALM‐5‐52‐0005

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.5 EL.63.000 & ABOVE 

1

1

0.140%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

26‐Dec‐17

28‐Dec‐17

4‐Mar‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

8‐Jul‐17

26‐Dec‐17

28‐Dec‐17

4‐Mar‐18

22‐Mar‐18

22‐Mar‐18

95%

95%

0%

0.133%

0.133%

251

8

PIPING

3963‐JALM‐5‐52‐0006

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.6 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

252

8

PIPING

3963‐JALM‐5‐52‐0007

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.7 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

253

SEQ

ACTS

ACTD

ACTIFC

ACTIFA

ACTIAWH

Plan WF

Actual WF

0.133%

0.133% 0.080%

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.8 EL.63000 & ABOVE 

1

A

0.112%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.106%

0.106%

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.9 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

13‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

13‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.10 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

256

8

PIPING

3963‐JALM‐5‐52‐0011

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.11 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

11‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

11‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

257

8

PIPING

3963‐JALM‐5‐52‐0012

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.12 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

258

8

PIPING

3963‐JALM‐5‐52‐0013

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.13 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

13‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

4‐Dec‐17

4‐Dec‐17

22‐Jul‐19

13‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

4‐Dec‐17

4‐Dec‐17

95%

95%

0%

0.067%

0.067%

259

8

PIPING

3963‐JALM‐5‐52‐0014

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.14 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

13‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

13‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

260

8

PIPING

3963‐JALM‐5‐52‐0015

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.15 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

13‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

13‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

261

8

PIPING

3963‐JALM‐5‐52‐0016

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.16 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

262

8

PIPING

3963‐JALM‐5‐52‐0017

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.17 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

263

8

PIPING

3963‐JALM‐5‐52‐0018

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.18 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

264

8

PIPING

3963‐JALM‐5‐52‐0019

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.19 EL.63.000 & ABOVE 

1

A

0.070%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

8‐Jul‐17

30‐Oct‐17

31‐Oct‐17

23‐Nov‐17

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.067%

0.067%

265

8

PIPING

3963‐KAHM‐5‐33‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; CRITICAL LINE LIST

1

A

0.042%

22‐Jun‐17

2‐Jul‐17

7‐Jul‐17

7‐Aug‐17

28‐Aug‐17

7‐Sep‐17

31‐Oct‐18

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

20‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

20‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.040%

0.040%

266

8

PIPING

3963‐KAHM‐5‐32‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST

1

A

0.028%

21‐May‐17

31‐May‐17

5‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

25‐May‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

25‐May‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.027%

0.027%

19‐Oct‐17

19‐Oct‐17

15‐Aug‐17

0.168%

5‐Aug‐17

5‐Sep‐17

15‐Sep‐17

15‐Sep‐17

31‐Oct‐18

30‐Mar‐18

1‐Apr‐18

7‐May‐18

27‐May‐18

27‐May‐18

22‐Jul‐19

30‐Mar‐18

1‐Apr‐18

7‐May‐18

27‐May‐18

27‐May‐18

95%

95%

0%

0.160%

0.160%

0.336%

10‐Jun‐17

20‐Jun‐17

25‐Jun‐17

26‐Jul‐17

16‐Aug‐17

26‐Aug‐17

31‐Oct‐18

8‐Jul‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

22‐Jul‐19

8‐Jul‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

95%

95%

0%

0.319%

0.319%

7‐May‐17

11‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

5‐May‐17

7‐May‐17

8‐May‐17

30‐Jul‐17

29‐Jul‐17

30‐Jul‐17

22‐Jul‐19

5‐May‐17

7‐May‐17

8‐May‐17

30‐Jul‐17

29‐Jul‐17

30‐Jul‐17

95%

95%

0%

0.080%

0.080%

10‐Jun‐17

11‐Jul‐17

1‐Aug‐17

11‐Aug‐17

31‐Oct‐18

1‐Jun‐17

15‐Jul‐17

16‐Jul‐17

26‐Oct‐17

26‐Oct‐17

26‐Nov‐17

22‐Jul‐19

1‐Jun‐17

15‐Jul‐17

16‐Jul‐17

26‐Oct‐17

26‐Oct‐17

26‐Nov‐17

95%

95%

0%

0.040%

0.040%

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

29‐Nov‐17

22‐Jul‐19

31‐May‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

29‐Nov‐17

95%

95%

0%

0.057%

0.057%

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

29‐Nov‐17

22‐Jul‐19

31‐May‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

29‐Nov‐17

95%

95%

0%

0.072%

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

2‐Aug‐17

3‐Aug‐17

29‐Oct‐17

29‐Oct‐17

29‐Nov‐17

22‐Jul‐19

31‐May‐17

2‐Aug‐17

3‐Aug‐17

29‐Oct‐17

29‐Oct‐17

29‐Nov‐17

95%

95%

0%

0.086%

0.086%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

28‐Nov‐17

22‐Jul‐19

1‐Jun‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

28‐Nov‐17

95%

95%

0%

0.086%

0.086%

0.075%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

28‐Nov‐17

22‐Jul‐19

1‐Jun‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

28‐Nov‐17

95%

95%

0%

0.072%

0.072%

0.075%

22‐Jul‐19

8

PIPING

3963‐KAHM‐5‐31‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS

3

A

8

PIPING

3963‐KAHM‐5‐31‐0002

ET

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS (EARLY T

3

A

270

8

PIPING

3963‐KAHM‐5‐50‐0002

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; KEY PLAN

1

A

0.042%

26‐May‐17

5‐Jun‐17

271

8

PIPING

3963‐KAHM‐5‐52‐0002

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.2 EL. 99.143 & ABOVE 

1

A

0.060%

31‐May‐17

10‐Jun‐17

272

8

PIPING

3963‐KAHM‐5‐52‐0004

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.4 EL. 99.143 & ABOVE 

1

A

0.075%

31‐May‐17

10‐Jun‐17

273

8

PIPING

3963‐KAHM‐5‐52‐0006

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.6 EL. 98.973 & ABOVE 

1

A

0.090%

31‐May‐17

274

8

PIPING

3963‐KAHM‐5‐52‐0007

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA‐255 SHT.7 EL.99.743 & ABOVE 

1

A

0.090%

275

8

PIPING

3963‐KAHM‐5‐52‐0010

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.10 EL. 99.443 & ABOVE 

1

A

20‐Aug‐17

0.067%

0.084%

268 269

Y

28‐Feb‐18

PLASBUILT

3963‐JALM‐5‐52‐0009

A

28‐Feb‐18

PLIAFC

3963‐JALM‐5‐52‐0010

3

23‐Nov‐17

PLIAWH

PIPING

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE

31‐Oct‐17

PLIFA

PIPING

OT

30‐Oct‐17

PLIFC

8

3963‐KAHM‐5‐21‐0001

OT

PLD

8

PIPING

3963‐JALM‐5‐52‐0008

PLS

254

8

PIPING

DOC NO

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

255

267

8

DISCIPLINE

CURRENT REVISION 1

Original BL WV

ITEM DOC DESC CODE OT DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.3 EL.63.000 & ABOVE 

SRN

DOC CLASS 1

SHUTD OWN PACKA GE SHUTD OWN

276

8

PIPING

3963‐KAHM‐5‐52‐0011

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A. AREA‐255, SHT.11 EL.99.9943 & ABOV

1

A

31‐May‐17

10‐Jun‐17

15‐Jun‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

28‐Dec‐17

31‐May‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

28‐Dec‐17

277

8

PIPING

3963‐KAHM‐5‐71‐0002

ET

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE‐IN

3

A

0.132%

6‐Jul‐17

16‐Jul‐17

20‐Jul‐17

30‐Jul‐17

9‐Aug‐17

19‐Aug‐17

31‐Oct‐18

18‐Jul‐17

19‐Jul‐17

20‐Jul‐17

7‐Sep‐17

7‐Sep‐17

30‐Nov‐17

22‐Jul‐19

18‐Jul‐17

19‐Jul‐17

20‐Jul‐17

7‐Sep‐17

7‐Sep‐17

30‐Nov‐17

95%

95%

0%

0.126%

0.126%

278

8

PIPING

3963‐KAHN‐5‐33‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; CRITICAL LINE LIST

1

A

0.042%

22‐Jun‐17

2‐Jul‐17

7‐Jul‐17

7‐Aug‐17

28‐Aug‐17

7‐Sep‐17

31‐Oct‐18

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

20‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

21‐Jun‐17

19‐Jul‐17

20‐Jul‐17

20‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.040%

0.040%

279

8

PIPING

3963‐KAHN‐5‐32‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST

1

A

0.028%

26‐May‐17

5‐Jun‐17

10‐Jun‐17

11‐Jul‐17

1‐Aug‐17

11‐Aug‐17

31‐Oct‐18

31‐May‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

31‐May‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.027%

0.027%

280

8

PIPING

3963‐KAHN‐5‐21‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE

19‐Oct‐17

19‐Oct‐17

281

8

PIPING

3963‐KAHN‐5‐31‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS

3

A

282

8

PIPING

3963‐KAHN‐5‐31‐0002

ET

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS (EARLY

3

A

283

8

PIPING

3963‐KAHN‐5‐50‐0002

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; KEY PLAN

1

284

8

PIPING

3963‐KAHN‐5‐52‐0006

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.6 EL.103.590 & ABOVE

1

285

8

PIPING

3963‐KAHN‐5‐52‐0008

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.8 EL.103.590 & ABOVE

286

8

PIPING

3963‐KAHN‐5‐52‐0009

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.9 EL.103.590 & ABOVE

287

8

PIPING

3963‐KAHN‐5‐52‐0011

OT

288

8

PIPING

3963‐KAHN‐5‐52‐0012

OT

PIPING

3963‐KAHN‐5‐71‐0002

289

8

ET

3

Y

A

26‐Oct‐17

95%

95%

0%

0.072%

0.072%

0.224%

8‐Aug‐17

6‐Sep‐17

11‐Sep‐17

11‐Sep‐17

31‐Oct‐18

30‐Mar‐18

1‐Apr‐18

5‐May‐18

31‐May‐18

31‐May‐18

22‐Jul‐19

30‐Mar‐18

1‐Apr‐18

5‐May‐18

31‐May‐18

31‐May‐18

95%

95%

0%

0.213%

0.213%

0.336%

12‐Jun‐17

22‐Jun‐17

27‐Jun‐17

28‐Jul‐17

18‐Aug‐17

28‐Aug‐17

31‐Oct‐18

11‐Jul‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

22‐Jul‐19

11‐Jul‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

95%

95%

0%

0.319%

0.319%

7‐May‐17

11‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

5‐May‐17

7‐May‐17

8‐May‐17

18‐Jul‐17

7‐Sep‐17

7‐Sep‐17

22‐Jul‐19

5‐May‐17

7‐May‐17

8‐May‐17

18‐Jul‐17

7‐Sep‐17

7‐Sep‐17

95%

95%

0%

0.080%

0.080%

A

0.042%

30‐Jun‐17

10‐Jul‐17

15‐Jul‐17

15‐Aug‐17

5‐Sep‐17

15‐Sep‐17

31‐Oct‐18

6‐Jul‐17

15‐Jul‐17

16‐Jul‐17

26‐Oct‐17

26‐Oct‐17

28‐Nov‐17

22‐Jul‐19

6‐Jul‐17

15‐Jul‐17

16‐Jul‐17

26‐Oct‐17

26‐Oct‐17

28‐Nov‐17

95%

95%

0%

0.040%

0.040%

A

0.070%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

19‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.067%

0.067%

1

B

0.070%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

20‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.067%

1

A

0.070%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

20‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.067%

0.067%

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.11 EL.103.590 & ABOV

1

A

0.070%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

15‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.067%

0.067%

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.12 EL.103.590 & ABOV

1

A

0.070%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

15‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.067%

0.067%

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE‐IN

3

A

6‐Jul‐17

16‐Jul‐17

20‐Jul‐17

30‐Jul‐17

9‐Aug‐17

19‐Aug‐17

31‐Oct‐18

7‐Sep‐17

30‐Nov‐17

18‐Jul‐17

19‐Jul‐17

20‐Jul‐17

7‐Sep‐17

30‐Nov‐17

18‐Jul‐17

19‐Jul‐17

20‐Jul‐17

290

8

PIPING

3963‐KAHS‐5‐33‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; CRITICAL LINE LIST

1

A

0.042%

23‐May‐17

2‐Jun‐17

7‐Jun‐17

8‐Jul‐17

29‐Jul‐17

8‐Aug‐17

31‐Oct‐18

25‐May‐17

19‐Jul‐17

20‐Jul‐17

20‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

25‐May‐17

19‐Jul‐17

20‐Jul‐17

20‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.040%

0.040%

8

PIPING

3963‐KAHS‐5‐32‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST

1

A

0.028%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

25‐May‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.027%

0.027%

19‐Oct‐17

19‐Oct‐17

292

8

PIPING

3963‐KAHS‐5‐21‐0001

OT

8

PIPING

3963‐KAHS‐5‐31‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS

3

A

294

8

PIPING

3963‐KAHS‐5‐31‐0002

ET

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS (EARLY

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE

3

3

A

A

295

8

PIPING

3963‐KAHS‐5‐50‐0002

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; KEY PLAN

1

296

8

PIPING

3963‐KAHS‐5‐52‐0004

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.4 EL.26.000 TO 28.600

1

297

8

PIPING

3963‐KAHS‐5‐52‐0005

OT

0.112%

25‐Aug‐17

22‐Jul‐19

7‐Sep‐17

95%

95%

0%

0.106%

0.106%

0.280%

10‐Aug‐17

8‐Sep‐17

13‐Sep‐17

13‐Sep‐17

31‐Oct‐18

6‐Apr‐18

8‐Apr‐18

7‐May‐18

31‐May‐18

31‐May‐18

22‐Jul‐19

6‐Apr‐18

8‐Apr‐18

7‐May‐18

31‐May‐18

31‐May‐18

95%

95%

0%

0.266%

0.266%

0.336%

15‐Jun‐17

25‐Jun‐17

30‐Jun‐17

31‐Jul‐17

21‐Aug‐17

31‐Aug‐17

31‐Oct‐18

8‐Jul‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

22‐Jul‐19

8‐Jul‐17

6‐Nov‐17

13‐Nov‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

95%

95%

0%

0.319%

0.319%

0.084%

7‐May‐17

11‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

5‐May‐17

7‐May‐17

8‐May‐17

18‐Jul‐17

7‐Sep‐17

7‐Sep‐17

22‐Jul‐19

5‐May‐17

7‐May‐17

8‐May‐17

18‐Jul‐17

7‐Sep‐17

7‐Sep‐17

95%

95%

0%

0.080%

0.080%

A

0.042%

20‐Jun‐17

30‐Jun‐17

5‐Jul‐17

5‐Aug‐17

26‐Aug‐17

5‐Sep‐17

31‐Oct‐18

22‐Jun‐17

15‐Jul‐17

16‐Jul‐17

26‐Oct‐17

26‐Oct‐17

28‐Nov‐17

22‐Jul‐19

22‐Jun‐17

15‐Jul‐17

16‐Jul‐17

26‐Oct‐17

26‐Oct‐17

28‐Nov‐17

95%

95%

0%

0.040%

0.040%

A

0.084%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

29‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

29‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.080%

0.080%

Y

20‐Aug‐17

7‐Sep‐17

0.067%

291 293

Y

23‐Aug‐17

26‐Oct‐17

0.084%

Y

18‐Aug‐17

16‐Jul‐17

0.072%

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.5 EL.28.600 & ABOVE

1

A

0.070%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.067%

0.067%

298

8

PIPING

3963‐KAHS‐5‐52‐0006

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.6 EL.26.000 TO 28.600

1

A

0.070%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.067%

0.067%

299

8

PIPING

3963‐KAHS‐5‐52‐0007

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.7 EL.26.000 TO 28.600

1

A

0.070%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.067%

0.067%

300

8

PIPING

3963‐KAHS‐5‐52‐0008

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.8 EL.26.000 TO 28.600

1

A

0.070%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.067%

0.067%

301

8

PIPING

3963‐KAHS‐5‐52‐0009

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.9 EL.26.000 & ABOVE

1

A

0.070%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

28‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.067%

0.067%

302

8

PIPING

3963‐KAHS‐5‐52‐0010

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.10 EL.26.000 & ABOVE

1

A

0.070%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

29‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

29‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.067%

0.067%

303

8

PIPING

3963‐KAHS‐5‐52‐0011

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.11 EL.26.000 & ABOVE

1

A

0.070%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

29‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

29‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.067%

304

8

PIPING

3963‐KAHS‐5‐52‐0012

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.12 EL.26.000 & ABOVE

1

A

0.070%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

29‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

22‐Jul‐19

29‐Jun‐17

21‐Oct‐17

23‐Oct‐17

7‐Nov‐17

7‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.067%

0.067%

305

8

PIPING

3963‐KAHS‐5‐71‐0002

ET

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE‐IN

3

A

0.132%

6‐Jul‐17

16‐Jul‐17

20‐Jul‐17

30‐Jul‐17

9‐Aug‐17

19‐Aug‐17

31‐Oct‐18

18‐Jul‐17

19‐Jul‐17

20‐Jul‐17

20‐Jul‐17

20‐Jul‐17

30‐Nov‐17

22‐Jul‐19

18‐Jul‐17

19‐Jul‐17

20‐Jul‐17

20‐Jul‐17

20‐Jul‐17

30‐Nov‐17

95%

95%

0%

0.126%

0.126%

306

8

PIPING

3963‐FAHM‐5‐33‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; CRITICAL LINE LIST

1

B

0.028%

16‐Jun‐17

26‐Jun‐17

1‐Jul‐17

1‐Aug‐17

22‐Aug‐17

1‐Sep‐17

31‐Oct‐18

22‐Jun‐17

19‐Jul‐17

20‐Jul‐17

23‐Aug‐17

13‐Sep‐17

14‐Sep‐17

22‐Jul‐19

22‐Jun‐17

19‐Jul‐17

20‐Jul‐17

23‐Aug‐17

13‐Sep‐17

14‐Sep‐17

95%

95%

0%

0.027%

27‐Aug‐17

29‐Aug‐17

Y

307

8

PIPING

3963‐FAHM‐5‐32‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST

1

A

0.028%

30‐Jul‐17

9‐Aug‐17

14‐Aug‐17

1‐Sep‐17

11‐Sep‐17

21‐Sep‐17

31‐Oct‐18

29‐Jul‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

29‐Jul‐17

30‐Jul‐17

31‐Jul‐17

18‐Aug‐17

308

8

PIPING

3963‐FAHM‐5‐21‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE

3

A

0.280%

15‐Aug‐17

25‐Aug‐17

30‐Aug‐17

13‐Sep‐17

18‐Sep‐17

18‐Sep‐17

31‐Oct‐18

19‐Oct‐17

20‐Mar‐18

13‐Aug‐18

30‐Aug‐18

2‐Dec‐18

2‐Dec‐18

22‐Jul‐19

19‐Oct‐17

20‐Mar‐18

13‐Aug‐18

30‐Aug‐18

26‐Jun‐17

13‐Nov‐17

13‐Nov‐17

309

3

A

0.336%

16‐Jun‐17

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

22‐Jul‐19

21‐Dec‐17

10‐Jan‐18

10‐Jan‐18

95%

95%

0%

0.319%

0.319%

PIPING

3963‐FAHM‐5‐17‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT

3

A

0.420%

30‐Jun‐17

10‐Jul‐17

15‐Jul‐17

29‐Jul‐17

3‐Aug‐17

3‐Aug‐17

31‐Oct‐18

3‐Jul‐17

19‐Sep‐17

20‐Sep‐17

9‐Oct‐17

25‐Oct‐17

29‐Jan‐18

22‐Jul‐19

3‐Jul‐17

19‐Sep‐17

20‐Sep‐17

9‐Oct‐17

25‐Oct‐17

29‐Jan‐18

95%

95%

0%

0.399%

0.399%

3963‐FAHM‐5‐52‐0003

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.3 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

28‐Nov‐17

30‐Nov‐17

1‐Feb‐18

4‐Mar‐18

4‐Mar‐18

22‐Jul‐19

19‐Oct‐17

28‐Nov‐17

30‐Nov‐17

1‐Feb‐18

4‐Mar‐18

4‐Mar‐18

95%

95%

0%

0.093%

0.093%

22‐Jun‐17

6‐Nov‐17

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.4 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

6‐Nov‐17

8‐Nov‐17

31‐Jan‐18

4‐Mar‐18

4‐Mar‐18

22‐Jul‐19

19‐Oct‐17

3963‐FAHM‐5‐52‐0005

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.5 EL.60.000 & ABOVE 

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

6‐Nov‐17

8‐Nov‐17

31‐Jan‐18

4‐Mar‐18

4‐Mar‐18

22‐Jul‐19

19‐Oct‐17

6‐Nov‐17

8‐Nov‐17

31‐Jan‐18

4‐Mar‐18

4‐Mar‐18

95%

95%

0%

0.093%

0.093%

3963‐FAHM‐5‐52‐0006

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.6 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

6‐Nov‐17

8‐Nov‐17

31‐Jan‐18

4‐Mar‐18

4‐Mar‐18

22‐Jul‐19

19‐Oct‐17

6‐Nov‐17

8‐Nov‐17

31‐Jan‐18

4‐Mar‐18

4‐Mar‐18

95%

95%

0%

0.093%

0.093%

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

6‐Nov‐17

PIPING

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.7 EL.60.000 & ABOVE

31‐Oct‐18

22‐Jun‐17

PIPING

OT

20‐Sep‐17

31‐Oct‐18

8

3963‐FAHM‐5‐52‐0007

10‐Sep‐17

20‐Jul‐17

8

PIPING

31‐Aug‐17

20‐Jul‐17

313

8

13‐Aug‐17

15‐Jul‐17

314 315

8‐Aug‐17

1‐Jul‐17

0.027% 0.182%

PIPING

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS

0.027% 0.182%

8

3963‐FAHM‐5‐52‐0004

OT

0% 0%

8

PIPING

3963‐FAHM‐5‐31‐0001

95% 65%

310

8

PIPING

0.027%

95% 65%

311 312

8

0.067%

19‐Oct‐17

6‐Nov‐17

8‐Nov‐17

4‐Mar‐18

22‐Jul‐19

19‐Oct‐17

6‐Nov‐17

6‐Nov‐17

8‐Nov‐17

8‐Nov‐17

31‐Jan‐18

4‐Mar‐18

4‐Mar‐18

4‐Mar‐18

95%

95%

95%

95%

0%

0%

0.093%

0.093%

0.093%

4‐Feb‐18

4‐Mar‐18

4‐Feb‐18

4‐Mar‐18

316

8

PIPING

3963‐FAHM‐5‐52‐0008

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.8 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

12‐Nov‐17

12‐Nov‐17

11‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

12‐Nov‐17

12‐Nov‐17

11‐Jan‐18

95%

95%

0%

0.093%

0.093%

317

8

PIPING

3963‐FAHM‐5‐52‐0009

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.9 EL.60.600 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.093%

0.093%

0.093%

318

8

PIPING

3963‐FAHM‐5‐52‐0010

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.10 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

95%

95%

0%

0.093%

0.093%

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

319

8

PIPING

3963‐FAHM‐5‐52‐0011

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.11 EL.60.700 & ABOVE 

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.093%

320

8

PIPING

3963‐FAHM‐5‐52‐0012

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐655 SHT.12 EL.60.450 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.093%

0.093%

321

8

PIPING

3963‐FAHM‐5‐52‐0013

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐655 SHT.13 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.093%

0.093%

322

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐655 SHT.14 EL.60.000 & ABOVE

1

0.098%

29‐Jul‐17

323

8

PIPING

3963‐FAHM‐5‐52‐0015

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐655 SHT.15 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.093%

0.093%

324

8

PIPING

3963‐FAHM‐5‐52‐0016

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.16 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.093%

0.093%

31‐Oct‐18

19‐Oct‐17

325

8

8

PIPING

PIPING

3963‐FAHM‐5‐52‐0014

3963‐FAHM‐5‐52‐0017

OT

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.17 EL.60.000 & ABOVE 

1

B

B

0.098%

29‐Jul‐17

8‐Aug‐17

8‐Aug‐17

13‐Aug‐17

13‐Aug‐17

31‐Aug‐17

31‐Aug‐17

10‐Sep‐17

10‐Sep‐17

20‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

31‐Oct‐17

2‐Nov‐17

2‐Nov‐17

23‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

22‐Jul‐19

19‐Oct‐17

19‐Oct‐17

31‐Oct‐17

31‐Oct‐17

2‐Nov‐17

2‐Nov‐17

23‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

95%

95%

0%

0%

0.093%

0.093%

0.093%

0.093%

0.093%

326

8

PIPING

3963‐FAHM‐5‐52‐0018

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.18 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.093%

0.093%

327

8

PIPING

3963‐FAHM‐5‐52‐0019

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.19 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.093%

0.093%

3963‐FAHM‐5‐52‐0020

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.20 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

329

8

PIPING

3963‐FAHM‐5‐52‐0021

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.21 EL.60.000 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

2‐Nov‐17

23‐Nov‐17

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.093%

0.093%

330

328

8

8

PIPING

PIPING

DEM‐3963‐FAHM‐5‐50‐0001

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PLOT PLAN

1

A

0.056%

22‐May‐17

1‐Jun‐17

6‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

31‐Oct‐18

25‐May‐17

25‐Jul‐17

26‐Jul‐17

24‐Aug‐17

14‐Sep‐17

29‐Jan‐18

18‐Oct‐17

22‐Jul‐19

25‐May‐17

25‐Jul‐17

26‐Jul‐17

24‐Aug‐17

14‐Sep‐17

29‐Jan‐18

18‐Oct‐17

29‐Jan‐18

95%

95%

95%

95%

0%

0%

0.053%

0.093%

0.053%

0.093%

331

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0001

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.1 EL.60.000 & ABOVE (DEM

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

95%

95%

0%

0.027%

0.027%

332

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0002

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.2 EL.60.000 & ABOVE (DEM

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

22‐Jul‐19

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

95%

95%

0%

0.040%

0.040%

333

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0003

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.3 EL.60.000 & ABOVE (DEM

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

22‐Jul‐19

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

95%

95%

0%

0.040%

0.040%

334

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0004

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.4 EL.60.000 & ABOVE (DEM

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

22‐Jul‐19

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

95%

95%

0%

0.027%

0.027%

335

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0005

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.5 EL.60.000 & ABOVE (DEM

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

24‐Aug‐17

14‐Sep‐17

17‐Oct‐17

95%

95%

0%

0.027%

336

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0006

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.6 EL.60.000 & ABOVE (DEM

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

17‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

17‐Oct‐17

95%

95%

0%

0.027%

0.027%

337

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0007

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.7 EL.60.000 & ABOVE (DEM

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

11‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

17‐Oct‐17

22‐Jul‐19

11‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

17‐Oct‐17

95%

95%

0%

0.027%

0.027%

338

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0008

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.8 EL.60.000 & ABOVE (DEM

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

339

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0009

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.9 EL.60.700 & ABOVE (DEM

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

18‐Oct‐17

95%

95%

0%

0.027%

340

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0010

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.10 EL.60.450 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

341

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0011

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.11 EL.60.000 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

11‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

18‐Oct‐17

22‐Jul‐19

11‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Aug‐17

5‐Oct‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

342

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0012

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.12 EL.60.000 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

29‐Aug‐17

17‐Oct‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

29‐Aug‐17

17‐Oct‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

0.027%

0.027%

343

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0013

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.13 EL.60.000 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

6‐Aug‐17

8‐Aug‐17

31‐Aug‐17

20‐Sep‐17

18‐Oct‐17

22‐Jul‐19

13‐Jul‐17

6‐Aug‐17

8‐Aug‐17

31‐Aug‐17

20‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

344

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0014

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.14 EL.60.000 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

6‐Aug‐17

8‐Aug‐17

31‐Aug‐17

20‐Sep‐17

18‐Oct‐17

22‐Jul‐19

13‐Jul‐17

6‐Aug‐17

8‐Aug‐17

31‐Aug‐17

20‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

345

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0015

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.15 EL.60.000 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

20‐Sep‐17

18‐Oct‐17

22‐Jul‐19

13‐Jul‐17

6‐Aug‐17

8‐Aug‐17

31‐Aug‐17

20‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

346

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0016

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.16 EL.60.000 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

6‐Aug‐17

8‐Aug‐17

29‐Aug‐17

17‐Oct‐17

18‐Oct‐17

22‐Jul‐19

13‐Jul‐17

6‐Aug‐17

8‐Aug‐17

29‐Aug‐17

17‐Oct‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

347

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0017

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.17 EL.60.200 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

6‐Aug‐17

8‐Aug‐17

29‐Aug‐17

17‐Oct‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

6‐Aug‐17

8‐Aug‐17

29‐Aug‐17

17‐Oct‐17

18‐Oct‐17

95%

95%

0%

0.027%

0.027%

348

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0018

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.18 EL.60.000 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

10‐Sep‐17

11‐Sep‐17

26‐Sep‐17

26‐Sep‐17

26‐Sep‐17

22‐Jul‐19

8‐Jul‐17

10‐Sep‐17

11‐Sep‐17

26‐Sep‐17

26‐Sep‐17

26‐Sep‐17

95%

95%

0%

0.027%

0.027%

349

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0019

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.19 EL.60.000 & ABOVE (DE

1

A

0.028%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

10‐Sep‐17

11‐Sep‐17

26‐Sep‐17

26‐Sep‐17

26‐Sep‐17

22‐Jul‐19

8‐Jul‐17

10‐Sep‐17

11‐Sep‐17

26‐Sep‐17

26‐Sep‐17

26‐Sep‐17

95%

95%

0%

0.027%

0.027%

350

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0020

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.23 EL.60.000 & ABOVE (DE

1

A

0.056%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

20‐Oct‐17

22‐Oct‐17

24‐Oct‐17

13‐Nov‐17

13‐Nov‐17

13‐Nov‐17

22‐Jul‐19

20‐Oct‐17

22‐Oct‐17

24‐Oct‐17

13‐Nov‐17

13‐Nov‐17

13‐Nov‐17

95%

95%

0%

0.053%

351

8

PIPING

DEM‐3963‐FAHM‐5‐52‐0021

DEM

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.25 EL.60.000 & ABOVE (DE

1

A

0.056%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

20‐Oct‐17

22‐Oct‐17

24‐Oct‐17

13‐Nov‐17

13‐Nov‐17

13‐Nov‐17

22‐Jul‐19

20‐Oct‐17

22‐Oct‐17

24‐Oct‐17

13‐Nov‐17

13‐Nov‐17

13‐Nov‐17

95%

95%

0%

0.053%

0.053%

352

8

PIPING

DEM‐3963‐FAHN‐5‐50‐0001

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PLOT PLAN (DEMOLITION)

1

A

0.056%

29‐May‐17

8‐Jun‐17

13‐Jun‐17

14‐Jul‐17

4‐Aug‐17

14‐Aug‐17

31‐Oct‐18

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

27‐Aug‐17

14‐Sep‐17

18‐Oct‐17

22‐Jul‐19

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

27‐Aug‐17

14‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.053%

0.053%

353

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0001

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.1 EL.21.600 TO 24.050 

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

22‐Jul‐19

20‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

6‐Aug‐17

8‐Aug‐17

31‐Aug‐17

0.053%

354

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0002

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 400, SHT.2 EL.21.600 & ABOVE (D

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

20‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

355

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0003

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.3 EL. 21.600 & ABOVE (

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

356

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0004

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.4 EL.21.600 & ABOVE (D

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

8‐Aug‐17

10‐Aug‐17

2‐Oct‐17

15‐Oct‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

8‐Aug‐17

10‐Aug‐17

2‐Oct‐17

15‐Oct‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

357

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0005

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.5 EL. 21.600 & ABOVE (

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

358

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0006

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.6 EL. 21.600 & ABOVE (

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

20‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

359

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0007

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.7 EL. 22.620 & ABOVE (

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

20‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

360

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0008

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.8 EL. 22.620 & ABOVE (

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

361

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0009

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.9 EL. 22.620 & ABOVE (

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

19‐Jul‐17

8‐Aug‐17

10‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

362

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0010

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.10 EL. 22.620 & ABOVE

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

363

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0011

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.11 EL. 22.620 & ABOVE

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

364

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0012

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.12 EL. 22.620 & ABOVE

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

22‐Jul‐19

19‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

365

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0013

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.13 EL. 22.620 & ABOVE

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

366

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0014

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.14 EL. 22.620 & ABOVE

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

367

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0015

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.15 EL. 22.620 & ABOVE

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

22‐Jul‐19

15‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

28‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

368

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0016

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.16 EL. 22.620 & ABOVE

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

20‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

369

8

PIPING

DEM‐3963‐FAHN‐5‐52‐0017

DEM

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.17 EL. 22.620 & ABOVE

1

A

0.042%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

22‐Jul‐19

20‐Jul‐17

11‐Aug‐17

13‐Aug‐17

17‐Sep‐17

25‐Sep‐17

16‐Oct‐17

95%

95%

0%

0.040%

0.040%

370

8

PIPING

DEM‐3963‐FAHS‐5‐50‐0001

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PLOT PLAN (DEMOLITION)

1

A

0.056%

12‐Jun‐17

22‐Jun‐17

27‐Jun‐17

28‐Jul‐17

18‐Aug‐17

28‐Aug‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

27‐Aug‐17

14‐Sep‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

27‐Aug‐17

14‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.053%

0.053%

371

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0001

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.1 EL. 54.364 & ABOVE (

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

24‐Sep‐17

17‐Oct‐17

18‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

24‐Sep‐17

17‐Oct‐17

18‐Oct‐17

95%

95%

0%

0.040%

0.040%

Page 3 of 13

Page 74 of 170

0.040%

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC NO

ITEM CODE

DOC DESC

DOC CLASS

CURRENT REVISION

Original BL WV

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100%

ACTIAFC

ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

372

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0002

ITEM DOC DOC DESC CODE CLASS DEM DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.2 EL. 54.364 & ABOVE ( 1

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

373

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0003

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.3 EL. 54.364 & ABOVE (

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

95%

95%

0%

0.040%

0.040%

374

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0004

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.4 EL. 54.364 & ABOVE (

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

95%

95%

0%

0.040%

0.040%

SRN

375

SEQ

8

DISCIPLINE

PIPING

DOC NO

DEM‐3963‐FAHS‐5‐52‐0005

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.5 EL. 54.364 & ABOVE (

1

CURRENT REVISION A

SHUTD OWN PACKA GE SHUTD OWN

A

WV

0.042%

PLS

21‐Jul‐17

PLD

31‐Jul‐17

PLIFC

5‐Aug‐17

PLIFA

23‐Aug‐17

PLIAWH

2‐Sep‐17

PLIAFC

12‐Sep‐17

PLASBUILT

31‐Oct‐18

PLS

27‐Jul‐17

PLD

15‐Aug‐17

PLIFC

17‐Aug‐17

PLIFA

3‐Oct‐17

PLIAWH

3‐Oct‐17

PLIAFC

3‐Oct‐17

PLASBUILT

22‐Jul‐19

ACTS

27‐Jul‐17

ACTD

15‐Aug‐17

ACTIFC

17‐Aug‐17

ACTIFA

3‐Oct‐17

ACTIAWH

3‐Oct‐17

3‐Oct‐17

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

95%

95%

0%

Plan WF 0.040%

0.040%

Actual WF 0.040%

0.040%

376

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0006

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.6 EL. 54.700 & ABOVE (

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

95%

95%

0%

0.040%

0.040%

377

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0007

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.7 EL. 54.700 & ABOVE (

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

3‐Oct‐17

3‐Oct‐17

3‐Oct‐17

95%

95%

0%

0.040%

0.040%

15‐Aug‐17

16‐Aug‐17

17‐Aug‐17

18‐Aug‐17

22‐Jul‐19

27‐Jul‐17

14‐Aug‐17

15‐Aug‐17

16‐Aug‐17

17‐Aug‐17

18‐Aug‐17

379

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0009

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.9 EL. 54.364 & ABOVE (

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

380

378

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0010

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.10 EL. 54.364 & ABOVE

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

381

8

8

PIPING

PIPING

DEM‐3963‐FAHS‐5‐52‐0008

DEM‐3963‐FAHS‐5‐52‐0011

DEM

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.8 EL. 54.364 & ABOVE (

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.11 EL. 54.664 & ABOVE

1

1

A

0.042%

A

0.042%

21‐Jul‐17

21‐Jul‐17

31‐Jul‐17

31‐Jul‐17

5‐Aug‐17

5‐Aug‐17

23‐Aug‐17

23‐Aug‐17

2‐Sep‐17

2‐Sep‐17

12‐Sep‐17

12‐Sep‐17

31‐Oct‐18

31‐Oct‐18

27‐Jul‐17

27‐Jul‐17

14‐Aug‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

95%

95%

0%

0%

0.040%

0.040%

0.040%

0.040%

382

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0012

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.12 EL. 54.364 & ABOVE

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

383

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0013

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.13 EL. 54.364 & ABOVE

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

385

8

PIPING

DEM‐3963‐FAHS‐5‐52‐0015

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.15 EL. 54.364 & ABOVE

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

386

384

8

8

PIPING

PIPING

DEM‐3963‐FAHS‐5‐52‐0016

DEM‐3963‐FAHS‐5‐52‐0014

DEM

DEM

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.16 EL. 54.364 & ABOVE

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.14 EL. 54.364 & ABOVE

1

1

A

A

0.042%

0.042%

21‐Jul‐17

21‐Jul‐17

31‐Jul‐17

31‐Jul‐17

5‐Aug‐17

5‐Aug‐17

23‐Aug‐17

23‐Aug‐17

2‐Sep‐17

2‐Sep‐17

12‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

27‐Jul‐17

15‐Aug‐17

17‐Aug‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.040%

0.040%

387

8

PIPING

DEM‐3963‐JALM‐5‐50‐0001

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PLOT PLAN (DEMOLITION)

1

A

0.056%

19‐Jun‐17

29‐Jun‐17

4‐Jul‐17

4‐Aug‐17

25‐Aug‐17

4‐Sep‐17

31‐Oct‐18

22‐Jun‐17

2‐Aug‐17

3‐Aug‐17

27‐Aug‐17

20‐Sep‐17

18‐Oct‐17

22‐Jul‐19

22‐Jun‐17

2‐Aug‐17

3‐Aug‐17

27‐Aug‐17

20‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.053%

0.053%

388

8

PIPING

DEM‐3963‐JALM‐5‐52‐0001

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 803, SHT.1 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

18‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

22‐Jul‐19

27‐Jul‐17

18‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

95%

95%

0%

0.040%

0.040%

389

8

PIPING

DEM‐3963‐JALM‐5‐52‐0002

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 803, SHT.2 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

18‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

22‐Jul‐19

27‐Jul‐17

18‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

95%

95%

0%

0.040%

0.040%

390

8

PIPING

DEM‐3963‐JALM‐5‐52‐0003

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.3 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

18‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

22‐Jul‐19

27‐Jul‐17

18‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

95%

95%

0%

0.040%

0.040%

391

8

PIPING

DEM‐3963‐JALM‐5‐52‐0004

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.4 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

22‐Jul‐19

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

95%

95%

0%

0.040%

0.040%

392

8

PIPING

DEM‐3963‐JALM‐5‐52‐0005

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.5 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

22‐Jul‐19

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

95%

95%

0%

0.040%

0.040%

393

8

PIPING

DEM‐3963‐JALM‐5‐52‐0006

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.6 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

22‐Jul‐19

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

95%

95%

0%

0.040%

0.040%

394

8

PIPING

DEM‐3963‐JALM‐5‐52‐0007

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.7 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

22‐Jul‐19

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

95%

95%

0%

0.040%

0.040%

395

8

PIPING

DEM‐3963‐JALM‐5‐52‐0008

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.8 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

22‐Jul‐19

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

95%

95%

0%

0.040%

0.040%

396

8

PIPING

DEM‐3963‐JALM‐5‐52‐0009

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.9 EL. 63.000 & ABOVE (DE

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

22‐Jul‐19

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

95%

95%

0%

0.040%

0.040%

397

8

PIPING

DEM‐3963‐JALM‐5‐52‐0010

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.10 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

22‐Jul‐19

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

95%

95%

0%

0.040%

0.040%

398

8

PIPING

DEM‐3963‐JALM‐5‐52‐0011

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.11 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

22‐Jul‐19

27‐Jul‐17

17‐Aug‐17

20‐Aug‐17

9‐Nov‐17

9‐Nov‐17

9‐Nov‐17

95%

95%

0%

0.040%

0.040%

399

8

PIPING

DEM‐3963‐JALM‐5‐52‐0012

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.12 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

22‐Jul‐19

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

5‐Oct‐17

9‐Oct‐17

9‐Oct‐17

95%

95%

0%

0.040%

0.040%

400

8

PIPING

DEM‐3963‐JALM‐5‐52‐0013

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.13 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

22‐Jul‐19

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

401

8

PIPING

DEM‐3963‐JALM‐5‐52‐0014

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.14 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

22‐Jul‐19

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

402

8

PIPING

DEM‐3963‐JALM‐5‐52‐0015

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.15 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

22‐Jul‐19

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

403

8

PIPING

DEM‐3963‐JALM‐5‐52‐0016

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.16 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

22‐Jul‐19

27‐Jul‐17

18‐Aug‐17

21‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

404

8

PIPING

DEM‐3963‐JALM‐5‐52‐0017

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.17 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

19‐Aug‐17

22‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

22‐Jul‐19

27‐Jul‐17

19‐Aug‐17

22‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

405

8

PIPING

DEM‐3963‐JALM‐5‐52‐0018

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.18 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

19‐Aug‐17

22‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

22‐Jul‐19

27‐Jul‐17

19‐Aug‐17

22‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

406

8

PIPING

DEM‐3963‐JALM‐5‐52‐0019

DEM

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.19 EL. 63.000 & ABOVE (D

1

A

0.042%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

31‐Oct‐18

27‐Jul‐17

19‐Aug‐17

22‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

22‐Jul‐19

27‐Jul‐17

19‐Aug‐17

22‐Aug‐17

27‐Sep‐17

11‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

407

8

PIPING

DEM‐3963‐KAHM‐5‐50‐0001

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PLOT PLAN (DEMOLITION)

1

A

0.056%

5‐Jun‐17

15‐Jun‐17

20‐Jun‐17

21‐Jul‐17

11‐Aug‐17

21‐Aug‐17

31‐Oct‐18

7‐Jun‐17

2‐Aug‐17

3‐Aug‐17

27‐Aug‐17

20‐Sep‐17

18‐Oct‐17

22‐Jul‐19

7‐Jun‐17

2‐Aug‐17

3‐Aug‐17

27‐Aug‐17

20‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.053%

408

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0001

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.1 EL.98.973 & ABOVE (D

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

11‐Jul‐17

17‐Oct‐17

18‐Oct‐17

6‐Nov‐17

6‐Nov‐17

23‐Nov‐17

22‐Jul‐19

11‐Jul‐17

17‐Oct‐17

18‐Oct‐17

6‐Nov‐17

6‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.040%

0.040%

409

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0002

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.2 EL. 99.143 & ABOVE (

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.040%

0.040%

410

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0003

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.3 EL.99.143 & ABOVE (D

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.040%

0.040%

411

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0004

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.4 EL. 99.143 & ABOVE (

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

22‐Jul‐19

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.040%

0.040%

412

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0005

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.5 EL. 99.743 & ABOVE (

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

17‐Oct‐17

18‐Oct‐17

6‐Nov‐17

6‐Nov‐17

23‐Nov‐17

22‐Jul‐19

13‐Jul‐17

17‐Oct‐17

18‐Oct‐17

6‐Nov‐17

6‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.040%

0.040%

413

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0006

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.6 EL. 98.973 & ABOVE (

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

22‐Jul‐19

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.040%

0.040%

414

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0007

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.7 EL. 99.863 & ABOVE (

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

17‐Oct‐17

18‐Oct‐17

6‐Nov‐17

6‐Nov‐17

23‐Nov‐17

22‐Jul‐19

13‐Jul‐17

17‐Oct‐17

18‐Oct‐17

6‐Nov‐17

6‐Nov‐17

23‐Nov‐17

95%

95%

0%

0.040%

0.040%

0.053%

415

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0008

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.8 SH24 EL.99.743 & AB

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

22‐Jul‐19

13‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.040%

0.040%

416

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0009

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.9 EL.99.443 & ABOVE (D

1

A

0.042%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

22‐Jul‐19

8‐Jul‐17

2‐Aug‐17

3‐Aug‐17

18‐Sep‐17

25‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.040%

0.040%

417

8

PIPING

DEM‐3963‐KAHN‐5‐50‐0001

DEM

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PLOT PLAN (DEMOLITION)

1

A

0.056%

26‐Jun‐17

6‐Jul‐17

11‐Jul‐17

11‐Aug‐17

1‐Sep‐17

11‐Sep‐17

31‐Oct‐18

29‐Jun‐17

2‐Aug‐17

3‐Aug‐17

27‐Aug‐17

20‐Sep‐17

18‐Oct‐17

22‐Jul‐19

29‐Jun‐17

2‐Aug‐17

3‐Aug‐17

27‐Aug‐17

20‐Sep‐17

18‐Oct‐17

95%

95%

0%

0.053%

0.053%

418

8

PIPING

DEM‐3963‐KAHN‐5‐52‐0001

DEM

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.1 EL.103.590 & ABOVE

1

A

0.042%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

22‐Jul‐19

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

95%

95%

0%

0.040%

0.040%

419

8

PIPING

DEM‐3963‐KAHN‐5‐52‐0002

DEM

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.2 EL.103.590 & ABOVE

1

A

0.042%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

22‐Jul‐19

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

95%

95%

0%

0.040%

0.040%

420

8

PIPING

DEM‐3963‐KAHN‐5‐52‐0003

DEM

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.3 EL.103.590 & ABOVE

1

A

0.042%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

22‐Jul‐19

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

95%

95%

0%

0.040%

0.040%

421

8

PIPING

DEM‐3963‐KAHN‐5‐52‐0004

DEM

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.4 EL.103.590 & ABOVE

1

A

0.042%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

22‐Jul‐19

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

95%

95%

0%

0.040%

0.040%

422

8

PIPING

DEM‐3963‐KAHN‐5‐52‐0005

DEM

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.5 EL.103.590 & ABOVE

1

A

0.042%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

22‐Jul‐19

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

95%

95%

0%

0.040%

423

8

PIPING

DEM‐3963‐KAHN‐5‐52‐0006

DEM

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.6 EL.103.590 & ABOVE

1

A

0.042%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

22‐Jul‐19

20‐Aug‐17

17‐Aug‐17

20‐Aug‐17

19‐Oct‐17

30‐Oct‐17

19‐Nov‐17

95%

95%

0%

0.040%

0.040%

424

8

PIPING

DEM‐3963‐KAHS‐5‐50‐0001

DEM

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PLOT PLAN (DEMOLITION)

1

A

0.056%

29‐Jun‐17

9‐Jul‐17

14‐Jul‐17

14‐Aug‐17

4‐Sep‐17

14‐Sep‐17

31‐Oct‐18

28‐Jun‐17

2‐Aug‐17

3‐Aug‐17

3‐Aug‐17

3‐Aug‐17

3‐Aug‐17

22‐Jul‐19

28‐Jun‐17

2‐Aug‐17

3‐Aug‐17

3‐Aug‐17

3‐Aug‐17

3‐Aug‐17

95%

95%

0%

0.053%

0.053%

425

8

PIPING

DEM‐3963‐KAHS‐5‐52‐0001

DEM

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.1 EL.26.000 TO 28.600

1

A

0.042%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

25‐Sep‐17

14‐Nov‐17

22‐Jul‐19

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

25‐Sep‐17

14‐Nov‐17

95%

95%

0%

0.040%

0.040% 0.040%

0.040%

426

8

PIPING

DEM‐3963‐KAHS‐5‐52‐0002

DEM

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.2 EL.28.600 & ABOVE 

1

A

0.042%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

28‐Sep‐17

14‐Nov‐17

22‐Jul‐19

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

28‐Sep‐17

14‐Nov‐17

95%

95%

0%

0.040%

427

8

PIPING

DEM‐3963‐KAHS‐5‐52‐0003

DEM

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.3 EL.26.000 TO 28.600

1

A

0.042%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

28‐Sep‐17

14‐Nov‐17

22‐Jul‐19

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

28‐Sep‐17

14‐Nov‐17

95%

95%

0%

0.040%

428

8

PIPING

DEM‐3963‐KAHS‐5‐52‐0004

DEM

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.4 EL.26.000 &ABOVE (

1

A

0.042%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

28‐Sep‐17

14‐Nov‐17

22‐Jul‐19

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

28‐Sep‐17

14‐Nov‐17

95%

95%

0%

0.040%

0.040%

429

8

PIPING

DEM‐3963‐KAHS‐5‐52‐0005

DEM

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.5 EL.26.000 & ABOVE 

1

A

0.042%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

28‐Sep‐17

14‐Nov‐17

22‐Jul‐19

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

28‐Sep‐17

14‐Nov‐17

95%

95%

0%

0.040%

0.040%

430

8

PIPING

DEM‐3963‐KAHS‐5‐52‐0006

DEM

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.6 EL.26.000 & ABOVE 

1

A

0.042%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

25‐Sep‐17

14‐Nov‐17

22‐Jul‐19

16‐Aug‐17

18‐Aug‐17

21‐Aug‐17

18‐Sep‐17

25‐Sep‐17

14‐Nov‐17

95%

95%

0%

0.040%

0.040%

DEM

9‐Sep‐17

19‐Sep‐17

19‐Oct‐17

19‐Nov‐17

21‐Nov‐17

431

PIPING

DEM‐3963‐KAHS‐5‐52‐0007

1

A

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

5‐Dec‐17

5‐Dec‐17

5‐Dec‐17

22‐Jul‐19

19‐Oct‐17

19‐Nov‐17

21‐Nov‐17

5‐Dec‐17

5‐Dec‐17

432

8

PIPING

3963‐FAHM‐5‐32‐0002

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; VALVE LIST

1

A

0.140%

19‐May‐17

29‐May‐17

3‐Jun‐17

4‐Jul‐17

25‐Jul‐17

4‐Aug‐17

31‐Oct‐18

25‐May‐17

22‐Jul‐17

23‐Jul‐17

10‐Aug‐17

20‐Aug‐17

26‐Oct‐17

22‐Jul‐19

25‐May‐17

22‐Jul‐17

23‐Jul‐17

10‐Aug‐17

20‐Aug‐17

26‐Oct‐17

95%

95%

0%

0.133%

0.133%

433

8

PIPING

3963‐FAHS‐5‐32‐0002

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; VALVE LIST

1

B

0.168%

21‐May‐17

31‐May‐17

5‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

25‐May‐17

22‐Jul‐17

23‐Jul‐17

10‐Aug‐17

23‐Aug‐17

24‐Aug‐17

22‐Jul‐19

25‐May‐17

22‐Jul‐17

23‐Jul‐17

10‐Aug‐17

23‐Aug‐17

24‐Aug‐17

95%

95%

0%

0.160%

0.160%

OT

22‐Jul‐19

25‐May‐17

22‐Jul‐17

434

8

0.084%

28‐Jul‐17

3963‐FAHN‐5‐32‐0002

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; VALVE LIST

1

A

0.140%

23‐May‐17

7‐Jun‐17

8‐Jul‐17

29‐Jul‐17

8‐Aug‐17

31‐Oct‐18

23‐Jul‐17

10‐Aug‐17

20‐Aug‐17

5‐Nov‐17

23‐Jul‐17

10‐Aug‐17

20‐Aug‐17

5‐Nov‐17

3963‐KAHM‐5‐32‐0002

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; VALVE LIST

1

A

0.070%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

25‐May‐17

19‐Jul‐17

20‐Jul‐17

23‐Aug‐17

14‐Sep‐17

14‐Nov‐17

22‐Jul‐19

25‐May‐17

19‐Jul‐17

20‐Jul‐17

23‐Aug‐17

14‐Sep‐17

14‐Nov‐17

95%

95%

0%

0.067%

0.067%

3963‐KAHS‐5‐32‐0002

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; VALVE LIST

1

A

0.070%

16‐May‐17

26‐May‐17

31‐May‐17

1‐Jul‐17

22‐Jul‐17

1‐Aug‐17

31‐Oct‐18

25‐May‐17

24‐Jul‐17

25‐Jul‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

22‐Jul‐19

25‐May‐17

24‐Jul‐17

25‐Jul‐17

2‐Nov‐17

2‐Nov‐17

24‐Jan‐18

95%

95%

0%

0.067%

0.067%

27‐May‐17

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; VALVE LIST

1

A

PIPING

3963‐JALM‐5‐32‐0002

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; VALVE LIST

1

A

3963‐KAHM‐5‐32‐0015

ET

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; VALVE LIST (EARLY TIE‐IN)

1

A

440

ET

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; VALVE LIST (EARLY TIE‐IN)

1

A

Y

17‐May‐17

31‐Oct‐18

25‐May‐17

23‐Aug‐17

14‐Sep‐17

22‐Jul‐19

25‐May‐17

23‐Aug‐17

14‐Sep‐17

22‐May‐17

1‐Jun‐17

6‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

25‐May‐17

24‐Jul‐17

25‐Jul‐17

23‐Aug‐17

14‐Sep‐17

2‐Nov‐17

22‐Jul‐19

25‐May‐17

24‐Jul‐17

25‐Jul‐17

23‐Aug‐17

14‐Sep‐17

2‐Nov‐17

95%

95%

0%

0.133%

0.133%

0.070%

8‐Mar‐17

18‐Mar‐17

23‐Mar‐17

23‐Apr‐17

14‐May‐17

24‐May‐17

31‐Oct‐18

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

30‐May‐17

12‐Jun‐17

12‐Jun‐17

22‐Jul‐19

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

30‐May‐17

12‐Jun‐17

12‐Jun‐17

95%

95%

0%

0.067%

0.067%

2‐Jul‐17

23‐Jul‐17

2‐Aug‐17

25‐Jul‐17

2‐Nov‐17

24‐Jul‐17

25‐Jul‐17

2‐Nov‐17

95%

95%

0%

0.067%

0.067%

8‐Mar‐17

18‐Mar‐17

23‐Mar‐17

23‐Apr‐17

14‐May‐17

24‐May‐17

31‐Oct‐18

17‐Mar‐17

20‐Mar‐17

30‐May‐17

12‐Jun‐17

12‐Jun‐17

22‐Jul‐19

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

30‐May‐17

12‐Jun‐17

12‐Jun‐17

95%

95%

0%

0.067%

0.067%

PIPING

3963‐KAHS‐5‐32‐0017

ET

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; VALVE LIST (EARLY TIE‐IN)

1

A

Y

0.070%

8‐Mar‐17

18‐Mar‐17

23‐Mar‐17

23‐Apr‐17

14‐May‐17

24‐May‐17

31‐Oct‐18

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

30‐May‐17

12‐Jun‐17

12‐Jun‐17

22‐Jul‐19

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

30‐May‐17

12‐Jun‐17

12‐Jun‐17

95%

95%

0%

0.067%

0.067%

3963‐DGEN‐5‐17‐0006

ET

DUKHAN FIELD; TECHNICAL BID EVALUATION FOR BALL VALVES (EARLY TIE‐INS)

1

A

Y

0.056%

26‐Mar‐17

5‐Apr‐17

10‐Apr‐17

11‐May‐17

1‐Jun‐17

11‐Jun‐17

31‐Oct‐18

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

5‐Jun‐17

24‐Jul‐17

25‐Jul‐17

22‐Jul‐19

15‐Mar‐17

17‐Mar‐17

20‐Mar‐17

5‐Jun‐17

24‐Jul‐17

25‐Jul‐17

95%

95%

0%

0.053%

0.053%

443

8

PIPING

3963‐DGEN‐5‐31‐0001

OT

DUKHAN FIELD ‐MTO FOR BALL VALVES

1

A

0.196%

24‐Jul‐17

26‐Jul‐17

28‐Jul‐17

9‐Aug‐17

21‐Aug‐17

2‐Sep‐17

31‐Oct‐18

21‐Mar‐17

30‐Jul‐17

31‐Jul‐17

9‐Dec‐17

21‐Dec‐17

21‐Dec‐17

22‐Jul‐19

21‐Mar‐17

30‐Jul‐17

31‐Jul‐17

9‐Dec‐17

21‐Dec‐17

21‐Dec‐17

95%

95%

0%

0.186%

0.186%

444

8

PIPING

3963‐DGEN‐5‐31‐0002

OT

DUKHAN FIELD ‐ MTO FOR MANUAL VALVES (GATE, GLOBE, NEEDLE & CHECK)

1

A

0.191%

24‐Jul‐17

26‐Jul‐17

28‐Jul‐17

9‐Aug‐17

21‐Aug‐17

2‐Sep‐17

31‐Oct‐18

27‐Jul‐17

30‐Jul‐17

31‐Jul‐17

25‐Oct‐17

25‐Oct‐17

4‐Dec‐17

22‐Jul‐19

27‐Jul‐17

30‐Jul‐17

31‐Jul‐17

25‐Oct‐17

25‐Oct‐17

4‐Dec‐17

95%

95%

0%

0.181%

0.181%

445

8

PIPING

3963‐DGEN‐5‐13‐0008

OT

DUKHAN FIELD ‐DATASHEET FOR BUTTERFLY VALVES

1

A

0.090%

1‐Aug‐17

6‐Aug‐17

11‐Aug‐17

21‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jul‐17

1‐Aug‐17

3‐Aug‐17

17‐Aug‐17

30‐Aug‐17

5‐Oct‐17

22‐Jul‐19

28‐Jul‐17

1‐Aug‐17

3‐Aug‐17

17‐Aug‐17

30‐Aug‐17

5‐Oct‐17

95%

95%

0%

0.085%

0.085%

3963‐DGEN‐5‐13‐0009

OT

DUKHAN FIELD ‐ DATASHEET FOR STRAINERS

1

A

8

PIPING

3963‐DGEN‐5‐15‐0007

OT

DUKHAN FIELD – MATERIAL REQUISITION FOR BUTTERFLY VALVES

1

A

6

PIPING

3963‐DGEN‐5‐00‐0001

OT

MISCELLANEOUS ‐ PIPING

0

0.168%

10‐Sep‐17

15‐Mar‐17

24‐Jul‐17

PIPING

447

0.070%

1‐Jun‐17

8

448

Y

0.070% 0.140%

8

PIPING

3963‐KAHN‐5‐32‐0016

OT

441

8

PIPING

3963‐KAHN‐5‐32‐0002

0.133%

442

446

8

PIPING

0.133%

0.080%

PIPING

PIPING

0%

0.080%

PIPING

8

95%

0%

PIPING

8

95%

95%

8

8

22‐Jul‐17

95%

8

438

25‐May‐17

5‐Dec‐17

435

439

2‐Jun‐17

31‐Oct‐18

436 437

8

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.7 EL.26.000 & ABOVE 

0.040%

1‐Aug‐17

6‐Aug‐17

11‐Aug‐17

21‐Aug‐17

31‐Aug‐17

31‐Oct‐18

28‐Jul‐17

1‐Aug‐17

3‐Aug‐17

17‐Aug‐17

19‐Sep‐17

20‐Sep‐17

22‐Jul‐19

28‐Jul‐17

1‐Aug‐17

3‐Aug‐17

17‐Aug‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.160%

0.160%

0.084%

1‐Aug‐17

6‐Aug‐17

11‐Aug‐17

21‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jul‐17

1‐Aug‐17

3‐Aug‐17

17‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

28‐Jul‐17

1‐Aug‐17

3‐Aug‐17

17‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.080%

0.080%

0.000%

31‐Aug‐17

6‐Sep‐17

7‐Sep‐17

14‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

1‐Feb‐18

6‐Feb‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

22‐Jul‐19

1‐Feb‐18

6‐Feb‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

95%

95%

0%

0.000%

0.000%

449

8

PIPING

3963‐FAHM‐7780‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7780‐6"‐OC‐CS1‐900‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

450

8

PIPING

3963‐FAHM‐7775‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7775‐6''‐OC‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

451

8

PIPING

3963‐FAHM‐7776‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7776‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

452

8

PIPING

3963‐FAHM‐1222‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐1222‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

453

8

PIPING

3963‐FAHM‐7790‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7790‐6''‐WD‐L5‐300‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

454

8

PIPING

3963‐FAHM‐7811‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7811‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

455

8

PIPING

3963‐FAHM‐7822‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7822‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

456

8

PIPING

3963‐FAHM‐7807‐3‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7807‐3''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

457

8

PIPING

3963‐FAHM‐7808‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7808‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

458

8

PIPING

3963‐FAHM‐7809‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7809‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

459

8

PIPING

3963‐FAHM‐7810‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7810‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

460

8

PIPING

3963‐FAHM‐8008‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8008‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

461

8

PIPING

3963‐FAHM‐8009‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8009‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

462

8

PIPING

3963‐FAHM‐8010‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8010‐3''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

463

8

PIPING

3963‐FAHM‐8011‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8011‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

464

8

PIPING

3963‐FAHM‐8013‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8013‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

0.019%

0.019%

465

8

PIPING

3963‐FAHM‐8012‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8012‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

466

8

PIPING

3963‐FAHM‐7777‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7777‐6"‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

467

8

PIPING

3963‐FAHM‐7778‐4‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7778‐4''‐OC‐CS1‐300‐4X

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

29‐Jan‐18

29‐Jan‐18

468

8

PIPING

3963‐FAHM‐7779‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7779‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

469

8

PIPING

3963‐FAHM‐7791‐4‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7791‐4"‐WD‐L5‐300‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

470

8

PIPING

3963‐FAHM‐7792‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7792‐6''‐WD‐L5‐300‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

471

8

PIPING

3963‐FAHM‐8015‐8‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8015‐8''‐GV‐CS1‐150‐8X

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

472

8

PIPING

3963‐FAHM‐8014‐4‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8014‐4''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

473

8

PIPING

3963‐FAHM‐1224‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐1224‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

474

8

PIPING

3963‐FAHM‐1223‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐1223‐8"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

475

8

PIPING

3963‐FAHM‐1225‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐1225‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

476

8

PIPING

3963‐FAHM‐1227‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐1227‐8''‐GP‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

477

8

PIPING

3963‐FAHM‐1228‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐1228‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

478

8

PIPING

3963‐FAHM‐8017‐2‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8017‐2"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

479

8

PIPING

3963‐FAHM‐8016‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8016‐3"‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

480

8

PIPING

3963‐FAHM‐1226‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐1226‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

481

8

PIPING

3963‐FAHM‐7818‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7818‐1''‐OD‐CS1‐300‐4X

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

482

8

PIPING

3963‐FAHM‐7823‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7823‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

483

8

PIPING

3963‐FAHM‐7824‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7824‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

484

8

PIPING

3963‐FAHM‐7816‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7816‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

485

8

PIPING

3963‐FAHM‐7815‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7815‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

486

8

PIPING

3963‐FAHM‐7820‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7820‐2"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

487

8

PIPING

3963‐FAHM‐7817‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7817‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

488

8

PIPING

3963‐FAHM‐7821‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7821‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

3

3

3

3

0

0

0

0

0.020%

0.020%

0.020%

21‐Aug‐17

21‐Aug‐17

21‐Aug‐17

31‐Aug‐17

31‐Aug‐17

31‐Aug‐17

5‐Sep‐17

5‐Sep‐17

5‐Sep‐17

16‐Sep‐17

16‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

18‐Jan‐18

28‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

22‐Jul‐19

22‐Jul‐19

18‐Jan‐18

18‐Jan‐18

18‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

95%

95%

95%

95%

0%

0%

0%

0.019%

0.019%

0.019%

0.019%

0.019%

0.019%

0.019%

489

8

PIPING

3963‐FAHM‐7819‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7819‐1"‐OD‐CS1‐300‐4X

490

8

PIPING

3963‐FAHM‐7812‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7812‐1"‐OD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

491

8

PIPING

3963‐FAHM‐7813‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7813‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

0.019%

492

8

PIPING

3963‐FAHM‐8012‐2‐AI

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐8012‐2"‐AI‐CS1‐150‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

14‐Mar‐18

14‐Mar‐18

14‐Mar‐18

14‐Mar‐18

14‐Mar‐18

22‐Jul‐19

18‐Jan‐18

14‐Mar‐18

14‐Mar‐18

14‐Mar‐18

14‐Mar‐18

14‐Mar‐18

95%

95%

0%

0.019%

0.019%

493

8

PIPING

3963‐FAHM‐7805‐4‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7805‐4"‐WF‐L5‐150‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

494

8

PIPING

3963‐FAHM‐7807‐2‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:14‐7807‐2"‐WF‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

495

8

PIPING

3963‐FAHN‐4304‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4304‐6"‐OC‐CS1‐900‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

Page 4 of 13

Page 75 of 170

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC NO

ITEM CODE

DOC DESC

DOC CLASS

CURRENT REVISION

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100% ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

SRN

SEQ

WV

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

ACTS

ACTD

ACTIFC

ACTIFA

ACTIAWH

ACTIAFC

496

8

PIPING

3963‐FAHN‐4299‐6‐OC

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

497

8

PIPING

3963‐FAHN‐4300‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4300‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

498

8

PIPING

3963‐FAHN‐4315‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4315‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

499

8

PIPING

3963‐FAHN‐4299‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4299‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

500

8

PIPING

3963‐FAHN‐4302‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4302‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

501

8

PIPING

3963‐FAHN‐4303‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4303‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

502

8

PIPING

3963‐FAHN‐4299‐3‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4299‐3''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

503

8

PIPING

3963‐FAHN‐4314‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4314‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

504

8

PIPING

3963‐FAHN‐4300‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4300‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

505

8

PIPING

3963‐FAHN‐4301‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4301‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

506

8

PIPING

3963‐FAHN‐4340‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4340‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

507

8

PIPING

3963‐FAHN‐4339‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4339‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

508

8

PIPING

3963‐FAHN‐4338‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4338‐3''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

509

8

PIPING

3963‐FAHN‐4335‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4335‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

510

8

PIPING

3963‐FAHN‐4337‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4337‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

511

8

PIPING

3963‐FAHN‐4336‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4336‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.019%

0.019% 0.019%

DOC NO

CURRENT REVISION 0

Original BL WV

ITEM DOC DESC CODE OT PIPING ISOMETRICS ‐ LINE NO.:12‐4299‐6''‐OC‐CS1‐150‐8X

DISCIPLINE

DOC CLASS 3

SHUTD OWN PACKA GE SHUTD OWN

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

Plan WF

Actual WF

0.019%

0.019% 0.019%

0.019%

512

8

PIPING

3963‐FAHN‐4303‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4303‐6"‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.019%

513

8

PIPING

3963‐FAHN‐4301‐4‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4301‐4''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

514

8

PIPING

3963‐FAHN‐4302‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4302‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

515

8

PIPING

3963‐FAHN‐4301‐4‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4301‐4"‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

516

8

PIPING

3963‐FAHN‐4300‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4300‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.019%

0.019%

517

8

PIPING

3963‐FAHN‐4333‐8‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4333‐8''‐GV‐CS1‐150‐8X

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

518

8

PIPING

3963‐FAHN‐4334‐4‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4334‐4''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.019%

0.019%

519

8

PIPING

3963‐FAHN‐4321‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4321‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

520

8

PIPING

3963‐FAHN‐4332‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4332‐8"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

27‐Feb‐18

1‐Mar‐18

1‐Mar‐18

1‐Mar‐18

1‐Mar‐18

22‐Jul‐19

18‐Jan‐18

27‐Feb‐18

1‐Mar‐18

1‐Mar‐18

1‐Mar‐18

1‐Mar‐18

95%

95%

0%

0.019%

0.019%

521

8

PIPING

3963‐FAHN‐4317‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4317‐8''‐GP‐CS1‐150‐8X

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

522

8

PIPING

3963‐FAHN‐4318‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4318‐8''‐GP‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.019%

0.019%

523

8

PIPING

3963‐FAHN‐4320‐2‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4320‐2"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.019%

0.019%

524

8

PIPING

3963‐FAHN‐4319‐3‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4319‐3"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.019%

0.019%

3

3

0

0

0.020%

0.020%

21‐Aug‐17

21‐Aug‐17

31‐Aug‐17

31‐Aug‐17

5‐Sep‐17

5‐Sep‐17

16‐Sep‐17

16‐Sep‐17

5‐Feb‐18

7‐Feb‐18

22‐Jul‐19

22‐Jul‐19

18‐Jan‐18

18‐Jan‐18

4‐Feb‐18

6‐Feb‐18

5‐Feb‐18

7‐Feb‐18

5‐Feb‐18

7‐Feb‐18

5‐Feb‐18

7‐Feb‐18

5‐Feb‐18

7‐Feb‐18

95%

95%

95%

95%

0%

0%

0.019%

0.019%

0.019%

0.019%

0.019%

525

8

PIPING

3963‐FAHN‐4316‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4316‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

526

8

PIPING

3963‐FAHN‐4310‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4310‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

527

8

PIPING

3963‐FAHN‐4313‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4313‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

528

8

PIPING

3963‐FAHN‐4307‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4307‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

529

8

PIPING

3963‐FAHN‐4306‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4306‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

530

8

PIPING

3963‐FAHN‐4308‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4308‐2"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

18‐Jan‐18

6‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.019%

0.019%

531

8

PIPING

3963‐FAHN‐4311‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4311‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

532

8

PIPING

3963‐FAHN‐4312‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4312‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

533

8

PIPING

3963‐FAHN‐4315‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4315‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

534

8

PIPING

3963‐FAHN‐4309‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4309‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

535

8

PIPING

3963‐FAHN‐4304‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4304‐1"‐OD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

536

8

PIPING

3963‐FAHN‐4305‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4305‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

18‐Jan‐18

4‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.019%

0.019%

537

8

PIPING

3963‐FAHN‐4343‐2‐AI

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4343‐2"‐AI‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

18‐Jan‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.019%

0.019%

538

8

PIPING

3963‐FAHN‐4304‐4‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:12‐4304‐4"‐WF‐L5‐150‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

PIPING

3963‐FAHN‐4306‐2‐WF

PIPING ISOMETRICS ‐ LINE NO.:12‐4305‐2"‐WF‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

540

8

PIPING

3963‐FAHS‐6006‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6006‐6"‐OC‐CS1‐900‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

541

8

PIPING

3963‐FAHS‐6001‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6001‐6''‐OC‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

542

8

PIPING

3963‐FAHS‐6002‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6002‐6''‐OC‐CS1‐300‐4X

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

543

8

PIPING

3963‐FAHS‐6278‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6278‐8''‐GP‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

22‐Jul‐19

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

95%

95%

0%

0.019%

0.019%

544

8

PIPING

3963‐FAHS‐6228‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6228‐6''‐WD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

22‐Jul‐19

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

95%

95%

0%

0.019%

0.019%

545

8

PIPING

3963‐FAHS‐6005‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6005‐2''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

546

8

PIPING

3963‐FAHS‐6004‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6004‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

547

8

PIPING

3963‐FAHS‐6006‐3‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6006‐3''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

548

8

PIPING

3963‐FAHS‐6001‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6001‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

549

8

PIPING

3963‐FAHS‐6002‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6002‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

550

8

PIPING

3963‐FAHS‐6003‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6003‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

551

8

PIPING

3963‐FAHS‐6295‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6295‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

552

8

PIPING

3963‐FAHS‐6299‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6299‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

553

8

PIPING

3963‐FAHS‐6297‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6297‐3''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

554

8

PIPING

3963‐FAHS‐6300‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6300‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

555

8

PIPING

3963‐FAHS‐6298‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6298‐6''‐GV‐CS1‐150‐8X

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

556

8

PIPING

3963‐FAHS‐6296‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6296‐10''‐GV‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

557

8

PIPING

3963‐FAHS‐6004‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6004‐6"‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

558

8

PIPING

3963‐FAHS‐6005‐4‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6005‐4''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

559

8

PIPING

3963‐FAHS‐6017‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6017‐6''‐OC‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

560

8

PIPING

3963‐FAHS‐6230‐4‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6230‐4"‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

561

8

PIPING

3963‐FAHS‐6229‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6229‐6''‐WD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

562

8

PIPING

3963‐FAHS‐6302‐8‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6302‐8''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

563

8

PIPING

3963‐FAHS‐6303‐4‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6303‐4''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

22‐Jul‐19

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

95%

95%

0%

0.019%

564

8

PIPING

3963‐FAHS‐6284‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6284‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

565

8

PIPING

3963‐FAHS‐6301‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6301‐8"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

8‐Apr‐18

8‐Apr‐18

8‐Apr‐18

8‐Apr‐18

8‐Apr‐18

22‐Jul‐19

18‐Jan‐18

8‐Apr‐18

8‐Apr‐18

8‐Apr‐18

8‐Apr‐18

8‐Apr‐18

95%

95%

0%

0.019%

0.019%

566

8

PIPING

3963‐FAHS‐6279‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6279‐8''‐GP‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

22‐Jul‐19

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

95%

95%

0%

0.019%

0.019%

539

567

8

OT

3

3

0

0

0.020%

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

21‐Sep‐17

0.019%

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

0.019%

0.019%

8

PIPING

3963‐FAHS‐6283‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6283‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

568

8

PIPING

3963‐FAHS‐6281‐2‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6281‐2"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

569

8

PIPING

3963‐FAHS‐6280‐3‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6280‐3"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

22‐Jul‐19

18‐Jan‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

14‐Feb‐18

95%

95%

0%

0.019%

0.019%

570

8

PIPING

3963‐FAHS‐6282‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6282‐6"‐GP‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

571

8

PIPING

3963‐FAHS‐6012‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6012‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

572

8

PIPING

3963‐FAHS‐6285‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6285‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

573

8

PIPING

3963‐FAHS‐6010‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6010‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

574

8

PIPING

3963‐FAHS‐6009‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6009‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

575

8

PIPING

3963‐FAHS‐6015‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6015‐2"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

576

8

PIPING

3963‐FAHS‐6016‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6016‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

577

8

PIPING

3963‐FAHS‐6011‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6011‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

578

8

PIPING

3963‐FAHS‐6014‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6014‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

579

8

PIPING

3963‐FAHS‐6013‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6013‐1"‐OD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

580

8

PIPING

3963‐FAHS‐6007‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6007‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

581

8

PIPING

3963‐FAHS‐6008‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6008‐1"‐OD‐CS1‐150‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

18‐Jan‐18

13‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.019%

0.019%

582

8

PIPING

3963‐FAHS‐6306‐2‐AI

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6306‐2"‐AI‐

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

15‐Mar‐18

15‐Mar‐18

15‐Mar‐18

15‐Mar‐18

15‐Mar‐18

22‐Jul‐19

18‐Jan‐18

15‐Mar‐18

15‐Mar‐18

15‐Mar‐18

15‐Mar‐18

15‐Mar‐18

95%

95%

0%

0.019%

0.019%

583

8

PIPING

3963‐FAHS‐6233‐4‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:13‐6233‐4"‐WF‐L5‐150‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

584

PIPING ISOMETRICS ‐ LINE NO.:13‐6235‐2"‐WF‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

585

8

PIPING

3963‐KAHM‐1345‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐1345‐6"‐OC‐CS1‐900‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

586

8

PIPING

3963‐KAHM‐1346‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐1346‐6''‐OC‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

22‐Jul‐19

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

95%

95%

0%

0.019%

0.019%

587

8

PIPING

3963‐KAHM‐1348‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐1348‐6''‐OC‐CS1‐300‐4X

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

95%

95%

0%

0.019%

0.019%

588

8

PIPING

3963‐KAHM‐8601‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8601‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

589

8

PIPING

3963‐KAHM‐8098‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8098‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

22‐Jul‐19

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

95%

95%

0%

0.019%

0.019%

590

8

PIPING

3963‐KAHM‐8083‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8083‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

591

8

PIPING

3963‐KAHM‐8081‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8081‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

592

8

8

PIPING

PIPING

3963‐FAHS‐6235‐2‐WF

3963‐KAHM‐8084‐3‐OD

OT

OT

3

0

21‐Sep‐17

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

0.019%

PIPING ISOMETRICS ‐ LINE NO.:24‐8084‐3''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

PIPING

3963‐KAHM‐8080‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8080‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

3963‐KAHM‐8082‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8082‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

595

8

PIPING

3963‐KAHM‐8621‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8621‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

0.019%

596

8

PIPING

3963‐KAHM‐8620‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8620‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

0.019%

597

8

PIPING

3963‐KAHM‐8622‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8622‐3''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

0.019%

598

8

PIPING

3963‐KAHM‐8623‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8623‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

599

8

PIPING

3963‐KAHM‐8624‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8624‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

0.019%

600

8

PIPING

3963‐KAHM‐8625‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8625‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

0.019%

601

8

PIPING

3963‐KAHM‐1349‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐1349‐6"‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

602

8

PIPING

3963‐KAHM‐1350‐4‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐1350‐4''‐OC‐CS1‐300‐4X

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

603

8

PIPING

3963‐KAHM‐1351‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐1351‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

604

8

PIPING

3963‐KAHM‐8100‐4‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8100‐4"‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

22‐Jul‐19

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

95%

95%

0%

0.019%

0.019%

605

8

PIPING

3963‐KAHM‐8099‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8099‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

22‐Jul‐19

18‐Jan‐18

23‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

95%

95%

0%

0.019%

0.019%

606

8

PIPING

3963‐KAHM‐8626‐8‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8626‐8''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

607

8

PIPING

3963‐KAHM‐8627‐4‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8627‐4''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

608

8

PIPING

3963‐KAHM‐8605‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8605‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

0.019%

609

8

PIPING

3963‐KAHM‐8604‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8604‐8"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

610

8

PIPING

3963‐KAHM‐8602‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8602‐8''‐GP‐CS1‐150‐8X

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

611

8

PIPING

3963‐KAHM‐8603‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8603‐8''‐GP‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

612

8

PIPING

3963‐KAHM‐8608‐2‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8608‐2"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

613

8

PIPING

3963‐KAHM‐8607‐3‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8607‐3"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

22‐Jan‐18

18‐Jan‐18

PIPING

31‐Aug‐17

22‐Jan‐18

22‐Jul‐19

8

21‐Aug‐17

21‐Jan‐18

24‐Jan‐18

8

0.020%

18‐Jan‐18

1‐Apr‐18

593

0

31‐Oct‐18

1‐Apr‐18

594

3

21‐Sep‐17

1‐Apr‐18

0.019%

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

0.019%

0.019%

0.019%

614

8

PIPING

3963‐KAHM‐8606‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8606‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

18‐Jan‐18

20‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.019%

0.019%

615

8

PIPING

3963‐KAHM‐8091‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8091‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

616

8

PIPING

3963‐KAHM‐8093‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8093‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

617

8

PIPING

3963‐KAHM‐8092‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8092‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

618

8

PIPING

3963‐KAHM‐8090‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8090‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

619

8

PIPING

3963‐KAHM‐8089‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8089‐2"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

Page 5 of 13

Page 76 of 170

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC NO

ITEM CODE

DOC DESC

DOC CLASS

CURRENT REVISION

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100%

ACTIAFC

ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

620

8

PIPING

3963‐KAHM‐8088‐1‐OD

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

0.019%

0.019%

621

8

PIPING

3963‐KAHM‐8094‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8094‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

622

8

PIPING

3963‐KAHM‐8096‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8096‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019% 0.019%

SEQ

DISCIPLINE

DOC NO

CURRENT REVISION 0

Original BL WV

ITEM DOC DESC CODE OT PIPING ISOMETRICS ‐ LINE NO.:24‐8088‐1"‐OD‐CS1‐300‐4X

SRN

DOC CLASS 3

SHUTD OWN PACKA GE SHUTD OWN

WV

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PIPING

3963‐KAHM‐8087‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8087‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

0%

0.019%

3963‐KAHM‐8085‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8085‐1"‐OD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

PIPING

3963‐KAHM‐8086‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8086‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

626

8

PIPING

3963‐KAHM‐8095‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8095‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

627

8

PIPING

3963‐KAHM‐8629‐2‐AI

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8629‐2"‐AI‐CS1‐150‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

PIPING

3963‐KAHM‐8176‐4‐WF

PIPING ISOMETRICS ‐ LINE NO.:24‐8176‐4"‐WF‐L5‐150‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

8

PIPING

3963‐KAHM‐8178‐2‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:24‐8178‐2"‐WF‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

8

PIPING

3963‐KAHN‐0170‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐170‐6"‐OC‐CS1‐900‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

631

8

PIPING

3963‐KAHN‐0162‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐162‐6''‐OC‐CS1‐150‐8X

16‐Sep‐17

21‐Sep‐17

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

632

8

PIPING

3963‐KAHN‐0163‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐163‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

633

8

PIPING

3963‐KAHN‐7615‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐7615‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

634

8

PIPING

3963‐KAHN‐0360‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐360‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

635

8

PIPING

3963‐KAHN‐0185‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐185‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

636

8

PIPING

3963‐KAHN‐0186‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐186‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

637

8

PIPING

3963‐KAHN‐0179‐3‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐179‐3''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

638

8

PIPING

3963‐KAHN‐0182‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐182‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

639

8

PIPING

3963‐KAHN‐0183‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐183‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

640

8

PIPING

3963‐KAHN‐0184‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐184‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

641

8

PIPING

3963‐KAHN‐0172‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐172‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

642

8

PIPING

3963‐KAHN‐0175‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐175‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

643

8

PIPING

3963‐KAHN‐0173‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐173‐3''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

644

8

PIPING

3963‐KAHN‐0176‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐176‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

645

8

PIPING

3963‐KAHN‐0174‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐174‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

646

8

PIPING

3963‐KAHN‐0177‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐177‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

647

8

PIPING

3963‐KAHN‐0164‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐164‐6"‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

648

8

PIPING

3963‐KAHN‐0165‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐165‐6"‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

649

8

PIPING

3963‐KAHN‐0168‐4‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐168‐4''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

650

8

PIPING

3963‐KAHN‐0167‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐167‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

651

8

PIPING

3963‐KAHN‐0361‐4‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐361‐4"‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

652

8

PIPING

3963‐KAHN‐0363‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐363‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

653

8

PIPING

3963‐KAHN‐0364‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐364‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

654

8

PIPING

3963‐KAHN‐0179‐8‐GV

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

655

8

PIPING

3963‐KAHN‐0178‐4‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐178‐4''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

656

8

PIPING

3963‐KAHN‐7621‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐7621‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

657

8

PIPING

3963‐KAHN‐7622‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐7622‐8"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

658

8

PIPING

3963‐KAHN‐7917‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐7917‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

659

8

PIPING

3963‐KAHN‐7619‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐7619‐8''‐GP‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

660

8

PIPING

3963‐KAHN‐7616‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐7616‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

661

8

PIPING

3963‐KAHN‐0180‐2‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐180‐2"‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

662

8

PIPING

3963‐KAHN‐7618‐3‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐7618‐3"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

663

8

PIPING

3963‐KAHN‐7620‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐7620‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

18‐Jan‐18

21‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

664

8

PIPING

3963‐KAHN‐0362‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐362‐1''‐OD‐CS1‐300‐4X

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

665

8

PIPING

3963‐KAHN‐0180‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐180‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

666

8

PIPING

3963‐KAHN‐0177‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐177‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

667

8

PIPING

3963‐KAHN‐0175‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐175‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

668

8

PIPING

3963‐KAHN‐0187‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐187‐2"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

669

8

PIPING

3963‐KAHN‐0169‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐169‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

670

8

PIPING

3963‐KAHN‐0178‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐178‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

671

8

PIPING

3963‐KAHN‐0188‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐188‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

672

8

PIPING

3963‐KAHN‐0176‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐176‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

673

8

PIPING

3963‐KAHN‐0174‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐174‐1"‐OD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

674

8

PIPING

3963‐KAHN‐0173‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐173‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

675

8

PIPING

3963‐KAHN‐0181‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐181‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.019%

0.019%

676

8

PIPING

3963‐KAHN‐0484‐2‐AI

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐484‐2"‐AI‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

18‐Jan‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.019%

0.019%

677

8

PIPING

3963‐KAHN‐5001‐4‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐5001‐4"‐WF‐L5‐150‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

21‐Sep‐17

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐179‐8''‐GV‐CS1‐150‐8X

3

3

0

0

0.020%

0.020%

0.020%

21‐Aug‐17

21‐Aug‐17

21‐Aug‐17

31‐Aug‐17

31‐Aug‐17

31‐Aug‐17

5‐Sep‐17

5‐Sep‐17

5‐Sep‐17

16‐Sep‐17

16‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

18‐Jan‐18

22‐Jan‐18

22‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

18‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.019%

0.019%

0.019%

0.019%

8

PIPING

3963‐KAHN‐5003‐2‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:22‐5003‐2"‐WF‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

8

PIPING

3963‐KAHS‐0106‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐106‐6"‐OC‐CS1‐900‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

8

PIPING

3963‐KAHS‐0101‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐101‐6''‐OC‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

681

8

PIPING

3963‐KAHS‐0102‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐102‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

682

8

PIPING

3963‐KAHS‐9775‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9775‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

683

8

PIPING

3963‐KAHS‐9776‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9776‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

3‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

22‐Jul‐19

18‐Jan‐18

3‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

95%

95%

0%

0.019%

0.019%

684

8

PIPING

3963‐KAHS‐9888‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9888‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

685

8

PIPING

3963‐KAHS‐9889‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9889‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

686

8

PIPING

3963‐KAHS‐9884‐3‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9884‐3''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

687

8

PIPING

3963‐KAHS‐9885‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9885‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

688

8

PIPING

3963‐KAHS‐9886‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9886‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

689

8

PIPING

3963‐KAHS‐9887‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9887‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

95%

95%

0%

0.019%

0.019%

690

8

PIPING

3963‐KAHS‐9886‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9886‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

27‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

22‐Jul‐19

18‐Jan‐18

27‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

95%

95%

0%

0.019%

0.019%

691

8

PIPING

3963‐KAHS‐9889‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9889‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

692

8

PIPING

3963‐KAHS‐9887‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9887‐3''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

693

8

PIPING

3963‐KAHS‐9890‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9890‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

694

8

PIPING

3963‐KAHS‐9888‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9888‐6''‐GV‐CS1‐150‐8X

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

695

8

PIPING

3963‐KAHS‐9885‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9885‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

8

PIPING

3963‐KAHS‐0104‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐104‐6"‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

697

8

PIPING

3963‐KAHS‐0103‐4‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐103‐4''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

698

8

PIPING

3963‐KAHS‐0105‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐105‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

699

8

PIPING

3963‐KAHS‐9777‐4‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9777‐4"‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

3‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

22‐Jul‐19

18‐Jan‐18

3‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

95%

95%

0%

0.019%

0.019%

700

8

PIPING

3963‐KAHS‐9778‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9778‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

3‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

22‐Jul‐19

18‐Jan‐18

3‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

4‐Feb‐18

95%

95%

0%

0.019%

0.019%

701

8

PIPING

3963‐KAHS‐9884‐8‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9884‐8''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

702

8

PIPING

3963‐KAHS‐9777‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9777‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

703

8

PIPING

3963‐KAHS‐9776‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9776‐8"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

704

8

PIPING

3963‐KAHS‐9778‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9778‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

705

8

PIPING

3963‐KAHS‐9779‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9779‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

706

8

PIPING

3963‐KAHS‐9893‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9893‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

707

8

PIPING

3963‐KAHS‐9895‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9895‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

8

PIPING

3963‐KAHS‐9892‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9892‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

8

PIPING

3963‐KAHS‐9899‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9899‐2"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

95%

95%

0%

0.019%

0.019%

711

8

PIPING

3963‐KAHS‐9898‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9898‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

PIPING

3963‐KAHS‐9896‐1‐OD

3963‐KAHS‐9897‐1‐OD

OT

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9896‐1"‐OD‐CS1‐300‐4X

PIPING ISOMETRICS ‐ LINE NO.:23‐9897‐1"‐OD‐CS1‐300‐4X

3

3

0

0

0.020%

0.020%

21‐Aug‐17

21‐Aug‐17

31‐Aug‐17

31‐Aug‐17

5‐Sep‐17

5‐Sep‐17

16‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

18‐Jan‐18

28‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

22‐Jul‐19

18‐Jan‐18

18‐Jan‐18

28‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

95%

95%

0%

0%

0.019%

0.019%

709

8

PIPING

5‐Sep‐17

710 712

8

31‐Aug‐17

0.019%

696

708

21‐Aug‐17

1‐Apr‐18

23‐Jan‐18

678

0.020%

1‐Apr‐18

23‐Jan‐18

0.019%

680

0

1‐Apr‐18

23‐Jan‐18

1‐Apr‐18

679

3

1‐Apr‐18

23‐Jan‐18

1‐Apr‐18

0.019%

629

0

1‐Apr‐18

95%

630

3

1‐Apr‐18

22‐Jan‐18

Actual WF

PIPING

1‐Apr‐18

22‐Jan‐18

Plan WF

8

1‐Apr‐18

22‐Jan‐18

ACTIAWH

8

1‐Apr‐18

22‐Jan‐18

ACTIFA

8

1‐Apr‐18

21‐Jan‐18

ACTIFC

623

OT

18‐Jan‐18

ACTD

625

8

22‐Jul‐19

ACTS

624

628

22‐Jan‐18

PLASBUILT

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

0.019%

0.019%

0.019%

713

8

PIPING

3963‐KAHS‐9900‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9900‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

27‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

22‐Jul‐19

18‐Jan‐18

27‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

28‐Jan‐18

95%

95%

0%

0.019%

0.019%

714

8

PIPING

3963‐KAHS‐9894‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9894‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

95%

95%

0%

0.019%

0.019%

715

8

PIPING

3963‐KAHS‐9890‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9890‐1"‐OD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

716

8

PIPING

3963‐KAHS‐9891‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9891‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

30‐Jan‐18

95%

95%

0%

0.019%

0.019%

717

8

PIPING

3963‐KAHS‐9899‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9899‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

18‐Jan‐18

28‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.019%

0.019%

18‐Jan‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Jan‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

718

8

PIPING

3963‐KAHS‐9871‐2‐AI

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐9871‐2"‐AI‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

22‐Jul‐19

95%

95%

0%

0.019%

0.019%

719

8

PIPING

3963‐KAHS‐3083‐4‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐3083‐4"‐WF‐L5‐150‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

720

8

PIPING

3963‐KAHS‐3087‐2‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:23‐3087‐2"‐WF‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

721

8

PIPING

3963‐JALM‐2090‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2090‐6"‐OC‐CS1‐900‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

20‐Feb‐18

20‐Feb‐18

20‐Feb‐18

20‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

20‐Feb‐18

20‐Feb‐18

20‐Feb‐18

20‐Feb‐18

95%

95%

0%

0.019%

0.019%

722

8

PIPING

3963‐JALM‐2037‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2037‐6''‐OC‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

723

8

PIPING

3963‐JALM‐2035‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2035‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

724

8

PIPING

3963‐JALM‐5201‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5201‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

725

8

PIPING

3963‐JALM‐2032‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2032‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

726

8

PIPING

3963‐JALM‐2083‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2083‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

727

8

PIPING

3963‐JALM‐2084‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2084‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

728

8

PIPING

3963‐JALM‐2079‐3‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2079‐3''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

729

8

PIPING

3963‐JALM‐2080‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2080‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

730

8

PIPING

3963‐JALM‐2081‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2081‐1"‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

731

8

PIPING

3963‐JALM‐2082‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2082‐2''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

732

8

PIPING

3963‐JALM‐5210‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5210‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

733

8

PIPING

3963‐JALM‐5213‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5213‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

734

8

PIPING

3963‐JALM‐5211‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5211‐3''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

735

8

PIPING

3963‐JALM‐5214‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5214‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

736

8

PIPING

3963‐JALM‐5212‐6‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5212‐6''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

737

8

PIPING

3963‐JALM‐5215‐10‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5215‐10''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

738

8

PIPING

3963‐JALM‐2086‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2086‐6"‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

739

8

PIPING

3963‐JALM‐2033‐4‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2033‐4''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

740

8

PIPING

3963‐JALM‐2089‐6‐OC

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2089‐6''‐OC‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

741

8

PIPING

3963‐JALM‐2088‐4‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2088‐4"‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

742

8

PIPING

3963‐JALM‐2034‐6‐WD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2034‐6''‐WD‐L5‐300‐1X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

743

8

PIPING

3963‐JALM‐5217‐8‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5217‐8''‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

Page 6 of 13

Page 77 of 170

0.019%

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC NO

ITEM CODE

DOC DESC

DOC CLASS

CURRENT REVISION

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100% ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

PLIAWH

PLIAFC

PLASBUILT

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

ACTS

ACTD

ACTIFC

ACTIFA

ACTIAWH

ACTIAFC

744

8

PIPING

3963‐JALM‐5216‐4‐GV

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

745

8

PIPING

3963‐JALM‐5204‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5204‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

746

8

PIPING

3963‐JALM‐5203‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5203‐8"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

747

8

PIPING

3963‐JALM‐5205‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5205‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

748

8

PIPING

3963‐JALM‐5202‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5202‐8''‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

749

8

PIPING

3963‐JALM‐5207‐8‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5207‐8''‐GP‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

750

8

PIPING

3963‐JALM‐5208‐2‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5208‐2"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

751

8

PIPING

3963‐JALM‐5206‐2‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5206‐2"‐GP‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

752

8

PIPING

3963‐JALM‐5218‐3‐GV

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5218‐3"‐GV‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

753

8

PIPING

3963‐JALM‐5209‐6‐GP

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5209‐6"‐GP‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

754

8

PIPING

3963‐JALM‐2089‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2089‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

755

8

PIPING

3963‐JALM‐2092‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2092‐1''‐OD‐CS1‐150‐8X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

756

8

PIPING

3963‐JALM‐2087‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2087‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

757

8

PIPING

3963‐JALM‐2086‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2086‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

758

8

PIPING

3963‐JALM‐2093‐2‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2093‐2"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

759

8

PIPING

3963‐JALM‐2094‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2094‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

760

8

PIPING

3963‐JALM‐2088‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2088‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

761

8

PIPING

3963‐JALM‐2091‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2091‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

20‐Feb‐18

762

8

PIPING

3963‐JALM‐2090‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2090‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

19‐Feb‐18

763

8

PIPING

3963‐JALM‐2084‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2084‐1''‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

764

8

PIPING

3963‐JALM‐2085‐1‐OD

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2085‐1"‐OD‐CS1‐300‐4X

3

0

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

765

8

PIPING

3963‐JALM‐5212‐2‐AI

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐5212‐2"‐AI‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

766

8

PIPING

3963‐JALM‐2086‐4‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2086‐4"‐WF‐L5‐150‐1X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

SEQ

DISCIPLINE

DOC NO

CURRENT REVISION 0

Original BL WV

ITEM DOC DESC CODE OT PIPING ISOMETRICS ‐ LINE NO.:31‐5216‐4''‐GV‐CS1‐150‐8X

SRN

DOC CLASS 3

SHUTD OWN PACKA GE SHUTD OWN

WV

PLS

PLD

PLIFC

PLIFA

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

Plan WF

Actual WF

0.019%

0.019%

0.019%

0.019%

0%

0.019%

0.019%

95%

0%

0.019%

0.019%

95%

95%

0%

0.019%

0.019%

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

20‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

18‐Jan‐18

19‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.019%

0.019%

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

18‐Jan‐18

20‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.019%

0.019%

31‐Oct‐18

18‐Jan‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

18‐Jan‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.019%

0.019%

21‐Sep‐17

31‐Oct‐18

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

22‐Jul‐19

18‐Jan‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

1‐Apr‐18

0.019%

0.019%

767

8

PIPING

3963‐JALM‐2087‐2‐WF

OT

PIPING ISOMETRICS ‐ LINE NO.:31‐2087‐2"‐WF‐CS1‐150‐4X

3

A

0.020%

21‐Aug‐17

31‐Aug‐17

5‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

1‐Apr‐18

95%

95%

0%

0.019%

0.019%

768

8

PIPING

3963‐KAHN‐5‐52‐0013

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING G.A. AREA 151 SH13 EL.103.590 & ABOVE

1

A

0.028%

31‐Mar‐17

10‐Apr‐17

15‐Apr‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

2‐Jan‐18

1‐Jan‐18

2‐Jan‐18

22‐Jan‐18

4‐Feb‐18

4‐Feb‐18

22‐Jul‐19

2‐Jan‐18

1‐Jan‐18

2‐Jan‐18

22‐Jan‐18

4‐Feb‐18

4‐Feb‐18

95%

95%

0%

0.026%

0.026%

769

8

PIPING

3963‐KAHN‐5‐52‐0014

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING G.A. AREA 151 SH14 EL.103.590 & ABOVE

1

A

0.028%

24‐Jul‐17

26‐Jul‐17

28‐Jul‐17

9‐Aug‐17

21‐Aug‐17

2‐Sep‐17

31‐Oct‐18

29‐Dec‐17

1‐Jan‐18

2‐Jan‐18

22‐Jan‐18

4‐Feb‐18

4‐Feb‐18

22‐Jul‐19

29‐Dec‐17

1‐Jan‐18

2‐Jan‐18

22‐Jan‐18

4‐Feb‐18

4‐Feb‐18

95%

95%

0%

0.026%

0.026%

770

8

PIPING

3963‐KAHN‐5‐52‐0015

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING G.A AREA 151 SH14 MANIFOLD SHUTDOW

1

A

0.028%

24‐Jul‐17

26‐Jul‐17

28‐Jul‐17

9‐Aug‐17

21‐Aug‐17

2‐Sep‐17

31‐Oct‐18

30‐Dec‐17

31‐Dec‐17

2‐Jan‐18

23‐Jan‐18

4‐Feb‐18

4‐Feb‐18

22‐Jul‐19

30‐Dec‐17

31‐Dec‐17

2‐Jan‐18

23‐Jan‐18

4‐Feb‐18

4‐Feb‐18

95%

95%

0%

0.026%

0.026%

771

8

PIPING

3963‐KAHS‐5‐52‐0013

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (23‐S

1

A

0.028%

1‐Aug‐17

6‐Aug‐17

11‐Aug‐17

21‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

2‐Jan‐18

2‐Jan‐18

2‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

2‐Jan‐18

2‐Jan‐18

2‐Jan‐18

29‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.026%

0.026%

772

8

PIPING

DEM‐3963‐KAHN‐5‐52‐0007

DEM

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (22‐S

1

A

0.014%

1‐Aug‐17

6‐Aug‐17

11‐Aug‐17

21‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

7‐Jan‐18

8‐Jan‐18

9‐Jan‐18

25‐Jan‐18

12‐Feb‐18

12‐Feb‐18

22‐Jul‐19

7‐Jan‐18

8‐Jan‐18

9‐Jan‐18

25‐Jan‐18

12‐Feb‐18

12‐Feb‐18

95%

95%

0%

0.013%

773

8

PIPING

DEM‐3963‐KAHM‐5‐52‐0010

DEM

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (24‐SD

1

A

0.014%

1‐Aug‐17

6‐Aug‐17

11‐Aug‐17

21‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

31‐Dec‐17

7‐Jan‐18

9‐Jan‐18

25‐Jan‐18

12‐Feb‐18

12‐Feb‐18

22‐Jul‐19

31‐Dec‐17

7‐Jan‐18

9‐Jan‐18

25‐Jan‐18

12‐Feb‐18

12‐Feb‐18

95%

95%

0%

0.013%

0.013%

774

8

PIPING

3963‐FAHN‐5‐36‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING TIE‐IN SCHEDULE

1

A

0.056%

23‐Jul‐17

2‐Aug‐17

7‐Aug‐17

25‐Aug‐17

4‐Sep‐17

14‐Sep‐17

31‐Oct‐18

27‐Jul‐17

2‐Aug‐17

3‐Aug‐17

29‐Oct‐17

29‐Oct‐17

11‐Jan‐18

22‐Jul‐19

27‐Jul‐17

2‐Aug‐17

3‐Aug‐17

29‐Oct‐17

29‐Oct‐17

11‐Jan‐18

95%

95%

0%

0.053%

0.053%

775

8

PIPING

3963‐FAHN‐5‐57‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPE SUPPORT LIST

1

A

0.056%

18‐Jul‐17

28‐Jul‐17

2‐Aug‐17

20‐Aug‐17

30‐Aug‐17

9‐Sep‐17

31‐Oct‐18

15‐Jul‐17

15‐Oct‐17

16‐Oct‐17

4‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

15‐Jul‐17

15‐Oct‐17

16‐Oct‐17

4‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.053%

0.053%

5‐Apr‐17

10‐Apr‐17

776

PIPING

3963‐FAHN‐5‐50‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PLOT PLAN

1

C

0.112%

26‐Mar‐17

11‐May‐17

1‐Jun‐17

11‐Jun‐17

31‐Oct‐18

29‐Mar‐17

5‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

3‐Sep‐18

22‐Jul‐19

29‐Mar‐17

5‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

3‐Sep‐18

95%

95%

0%

0.106%

0.106%

777

8

PIPING

3963‐FAHN‐5‐50‐0002

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; KEY PLAN

1

A

0.042%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

21‐Jan‐18

22‐Jul‐19

27‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Oct‐17

26‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.040%

0.040%

778

8

PIPING

3963‐FAHS‐5‐57‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPE SUPPORT LIST 

1

A

0.056%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

8‐Oct‐17

10‐Oct‐17

3‐Jan‐18

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

27‐Jul‐17

8‐Oct‐17

10‐Oct‐17

3‐Jan‐18

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.053%

0.053%

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PLOT PLAN

10‐Apr‐17

12‐Apr‐17

779

8

0.013%

1

C

0.112%

31‐Mar‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

29‐Mar‐17

23‐Oct‐17

3‐Sep‐18

22‐Jul‐19

29‐Mar‐17

23‐Oct‐17

3‐Sep‐18

780

8

PIPING

3963‐JALM‐5‐57‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPE SUPPORT LIST

1

A

0.056%

24‐Jul‐17

3‐Aug‐17

8‐Aug‐17

26‐Aug‐17

5‐Sep‐17

15‐Sep‐17

31‐Oct‐18

27‐Jul‐17

15‐Oct‐17

16‐Oct‐17

10‐Jan‐18

22‐Jan‐18

22‐Jan‐18

22‐Jul‐19

27‐Jul‐17

15‐Oct‐17

16‐Oct‐17

10‐Jan‐18

22‐Jan‐18

22‐Jan‐18

95%

95%

0%

0.053%

0.053%

781

8

PIPING

3963‐JALM‐5‐50‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PLOT PLAN

1

C

0.112%

1‐Apr‐17

11‐Apr‐17

16‐Apr‐17

17‐May‐17

7‐Jun‐17

17‐Jun‐17

31‐Oct‐18

5‐Apr‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

3‐Sep‐18

22‐Jul‐19

5‐Apr‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

3‐Sep‐18

95%

95%

0%

0.106%

0.106%

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING TIE‐IN SCHEDULE

30‐Aug‐17

17‐Sep‐17

18‐Sep‐17

10‐Dec‐17

17‐Sep‐17

18‐Sep‐17

10‐Dec‐17

782

8

8

PIPING

PIPING

3963‐FAHS‐5‐50‐0001

3963‐KAHM‐5‐36‐0001

OT

OT

18‐Jul‐17

15‐Apr‐17

9‐Sep‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

11‐Jan‐18

23‐Oct‐17

95%

0%

0.106%

0.053%

0.106%

1

A

0.056%

28‐Jul‐17

2‐Aug‐17

20‐Aug‐17

31‐Oct‐18

20‐Jul‐17

22‐Jul‐19

20‐Jul‐17

8

PIPING

3963‐KAHM‐5‐57‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPE SUPPORT LIST

1

A

0.112%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

2‐Oct‐17

3‐Oct‐17

5‐Oct‐17

10‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

2‐Oct‐17

3‐Oct‐17

5‐Oct‐17

10‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.106%

0.106%

PIPING

3963‐KAHM‐5‐17‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT

3

A

0.336%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

25‐Sep‐17

27‐Sep‐17

16‐Oct‐17

29‐Oct‐17

21‐Jan‐18

22‐Jul‐19

1‐Jun‐17

25‐Sep‐17

27‐Sep‐17

16‐Oct‐17

29‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.319%

0.319%

22‐Jul‐19

15‐Mar‐17

0.053%

785

8

PIPING

3963‐KAHM‐5‐50‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PLOT PLAN

1

A

0.112%

30‐Mar‐17

9‐Apr‐17

14‐Apr‐17

15‐May‐17

5‐Jun‐17

15‐Jun‐17

31‐Oct‐18

15‐Mar‐17

5‐Apr‐17

13‐Apr‐17

23‐Oct‐17

13‐Apr‐17

23‐Oct‐17

3‐Sep‐18

95%

95%

0%

0.106%

0.106%

786

8

PIPING

3963‐KAHN‐5‐36‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING TIE‐IN SCHEDULE

1

A

0.056%

19‐Jul‐17

29‐Jul‐17

3‐Aug‐17

21‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

15‐Jul‐17

22‐Sep‐17

24‐Sep‐17

7‐Dec‐17

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

15‐Jul‐17

22‐Sep‐17

24‐Sep‐17

7‐Dec‐17

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

0.053%

0.053%

787

8

PIPING

3963‐KAHN‐5‐57‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPE SUPPORT LIST

1

A

0.056%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

14‐Oct‐17

15‐Oct‐17

16‐Oct‐17

8‐Jan‐18

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

14‐Oct‐17

15‐Oct‐17

16‐Oct‐17

8‐Jan‐18

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.053%

0.053%

788

8

PIPING

3963‐KAHN‐5‐17‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT

3

A

0.420%

5‐Jun‐17

15‐Jun‐17

20‐Jun‐17

21‐Jul‐17

11‐Aug‐17

21‐Aug‐17

31‐Oct‐18

7‐Jun‐17

19‐Sep‐17

20‐Sep‐17

9‐Oct‐17

9‐Oct‐17

21‐Jan‐18

22‐Jul‐19

7‐Jun‐17

19‐Sep‐17

20‐Sep‐17

9‐Oct‐17

9‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.399%

0.399%

789

8

PIPING

3963‐KAHN‐5‐50‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PLOT PLAN

1

A

0.112%

31‐Mar‐17

10‐Apr‐17

15‐Apr‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

12‐Mar‐17

5‐Apr‐17

13‐Apr‐17

23‐Oct‐17

2‐Nov‐17

21‐Jan‐18

22‐Jul‐19

12‐Mar‐17

5‐Apr‐17

13‐Apr‐17

23‐Oct‐17

2‐Nov‐17

21‐Jan‐18

95%

95%

0%

0.106%

0.106%

790

8

PIPING

3963‐KAHN‐5‐52‐0005

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.5 EL.103.590 & ABOVE

1

A

0.070%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

15‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.067%

791

8

PIPING

3963‐KAHN‐5‐52‐0007

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.7 EL.103.590 & ABOVE

1

A

0.084%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

15‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.080%

0.080%

792

8

PIPING

3963‐KAHN‐5‐52‐0010

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.10 EL.103.590 & ABOV

1

A

0.070%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

19‐Jul‐17

9‐Oct‐17

11‐Oct‐17

19‐Nov‐17

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.067%

0.067%

793

8

PIPING

3963‐KAHS‐5‐36‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING TIE‐IN SCHEDULE

1

A

0.056%

22‐Jul‐17

1‐Aug‐17

6‐Aug‐17

24‐Aug‐17

3‐Sep‐17

13‐Sep‐17

31‐Oct‐18

27‐Jul‐17

17‐Sep‐17

18‐Sep‐17

11‐Dec‐17

17‐Jan‐18

17‐Jan‐18

22‐Jul‐19

27‐Jul‐17

17‐Sep‐17

18‐Sep‐17

11‐Dec‐17

17‐Jan‐18

17‐Jan‐18

95%

95%

0%

0.053%

0.053%

7‐Aug‐17

12‐Aug‐17

14‐Oct‐17

15‐Oct‐17

14‐Oct‐17

15‐Oct‐17

794

0.056%

28‐Jul‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

3‐Jan‐18

11‐Jan‐18

3‐Jan‐18

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.053%

0.053%

795

8

PIPING

3963‐KAHS‐5‐17‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT

3

A

0.420%

10‐Jun‐17

20‐Jun‐17

25‐Jun‐17

26‐Jul‐17

16‐Aug‐17

26‐Aug‐17

31‐Oct‐18

8‐Jul‐17

3‐Oct‐17

5‐Oct‐17

23‐Oct‐17

23‐Oct‐17

31‐Jan‐18

22‐Jul‐19

8‐Jul‐17

3‐Oct‐17

5‐Oct‐17

23‐Oct‐17

23‐Oct‐17

31‐Jan‐18

95%

95%

0%

0.399%

0.399%

8

PIPING

3963‐KAHS‐5‐50‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PLOT PLAN

1

A

0.112%

1‐Apr‐17

11‐Apr‐17

16‐Apr‐17

17‐May‐17

7‐Jun‐17

17‐Jun‐17

31‐Oct‐18

14‐Mar‐17

5‐Apr‐17

13‐Apr‐17

23‐Oct‐17

2‐Nov‐17

21‐Jan‐18

22‐Jul‐19

14‐Mar‐17

5‐Apr‐17

13‐Apr‐17

23‐Oct‐17

2‐Nov‐17

21‐Jan‐18

95%

95%

0%

0.106%

0.106%

31‐Oct‐18

3963‐FAHM‐5‐36‐0001

OT

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPE SUPPORT LIST

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING TIE‐IN SCHEDULE

1

1

A

A

0.056%

26‐Jul‐17

5‐Aug‐17

10‐Aug‐17

28‐Aug‐17

7‐Sep‐17

17‐Sep‐17

17‐Jul‐17

13‐Nov‐17

17‐Jul‐17

13‐Nov‐17

PIPING

3963‐FAHM‐5‐57‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPE SUPPORT LIST

1

A

0.084%

28‐Jul‐17

7‐Aug‐17

12‐Aug‐17

30‐Aug‐17

9‐Sep‐17

19‐Sep‐17

31‐Oct‐18

2‐Oct‐17

3‐Oct‐17

5‐Oct‐17

20‐Dec‐17

21‐Jan‐18

21‐Jan‐18

22‐Jul‐19

2‐Oct‐17

3‐Oct‐17

5‐Oct‐17

20‐Dec‐17

21‐Jan‐18

21‐Jan‐18

95%

95%

0%

0.080%

0.080%

3963‐FAHM‐5‐50‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PLOT PLAN

1

A

0.112%

31‐Mar‐17

10‐Apr‐17

15‐Apr‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

29‐Mar‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

25‐Jan‐18

22‐Jul‐19

29‐Mar‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

25‐Jan‐18

95%

95%

0%

0.106%

0.106%

26‐Aug‐17

31‐Oct‐18

15‐Mar‐17

22‐Jul‐19

15‐Mar‐17

15‐Jul‐17

16‐Jul‐17

3963‐FAHM‐5‐50‐0003

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; KEY PLAN

1

A

0.056%

20‐Jun‐17

5‐Jul‐17

5‐Aug‐17

16‐Jul‐17

26‐Oct‐17

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN

1

A

0.056%

31‐Mar‐17

10‐Apr‐17

15‐Apr‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

6‐Mar‐18

22‐Jul‐19

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

6‐Mar‐18

95%

95%

0%

0.053%

0.053%

3963‐KAHN‐5‐51‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; EQUIPMENT LOCATION PLAN

1

A

0.056%

31‐Mar‐17

10‐Apr‐17

15‐Apr‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

21‐Jan‐18

22‐Jul‐19

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

23‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.053%

0.053%

6‐Jun‐17

31‐Oct‐18

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

1‐Nov‐17

21‐Jan‐18

22‐Jul‐19

0.053%

0.053%

PIPING

3963‐KAHS‐5‐51‐0001

10‐Apr‐17

15‐Apr‐17

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

23‐Oct‐17

1‐Nov‐17

21‐Jan‐18

95%

95%

0%

0.053%

0.053%

804

8

PIPING

3963‐FAHM‐5‐51‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN

1

A

0.056%

31‐Mar‐17

10‐Apr‐17

15‐Apr‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

24‐Oct‐17

24‐Oct‐17

25‐Jan‐18

22‐Jul‐19

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

24‐Oct‐17

24‐Oct‐17

25‐Jan‐18

95%

95%

0%

0.053%

0.053%

8

PIPING

3963‐FAHN‐5‐51‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; EQUIPMENT LOCATION PLAN

1

A

0.056%

31‐Mar‐17

10‐Apr‐17

15‐Apr‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

24‐Oct‐17

24‐Oct‐17

21‐Jan‐18

22‐Jul‐19

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

24‐Oct‐17

24‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.053%

0.053%

806

8

PIPING

3963‐FAHS‐5‐51‐0001

OT

21‐Jan‐18

22‐Jul‐19

DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; EQUIPMENT LOCATION PLAN

1

A

0.056%

31‐Mar‐17

15‐Apr‐17

16‐May‐17

16‐Jun‐17

31‐Oct‐18

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

24‐Oct‐17

24‐Oct‐17

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

24‐Oct‐17

24‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.053%

0.053%

807

8

PIPING

3963‐JALM‐5‐51‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN

1

A

0.056%

31‐Mar‐17

10‐Apr‐17

15‐Apr‐17

16‐May‐17

6‐Jun‐17

16‐Jun‐17

31‐Oct‐18

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

24‐Oct‐17

24‐Oct‐17

4‐Mar‐18

22‐Jul‐19

9‐Apr‐17

12‐Apr‐17

13‐Apr‐17

24‐Oct‐17

24‐Oct‐17

4‐Mar‐18

95%

95%

0%

0.053%

0.053%

808

8

PIPING

3963‐DGEN‐5‐17‐0002

OT

DUKHAN FIELD; TECHNICAL BID EVALUATION FOR PIPING BULK ITEMS

1

A

1.270%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

4‐Dec‐17

6‐Dec‐17

18‐Jan‐18

29‐Jan‐18

29‐Jan‐18

22‐Jul‐19

19‐Oct‐17

4‐Dec‐17

6‐Dec‐17

18‐Jan‐18

29‐Jan‐18

29‐Jan‐18

95%

95%

0%

1.206%

1.206%

809

8

PIPING

3963‐DGEN‐5‐57‐0001

OT

DUKHAN FIELD ‐ STANDARD PIPE SUPPORT DETAILS 

1

A

0.168%

21‐Jul‐17

31‐Jul‐17

5‐Aug‐17

23‐Aug‐17

2‐Sep‐17

12‐Sep‐17

31‐Oct‐18

27‐Jul‐17

10‐Oct‐17

12‐Oct‐17

21‐Jan‐18

1‐Feb‐18

1‐Feb‐18

22‐Jul‐19

27‐Jul‐17

10‐Oct‐17

12‐Oct‐17

21‐Jan‐18

1‐Feb‐18

1‐Feb‐18

95%

95%

0%

0.160%

0.160%

810

8

PIPING

3963‐FAHN‐5‐52‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.1 PIPING GA EL.21.600 TO 24.050 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

11‐Dec‐17

13‐Dec‐17

7‐Feb‐18

28‐Feb‐18

28‐Feb‐18

22‐Jul‐19

19‐Oct‐17

11‐Dec‐17

13‐Dec‐17

7‐Feb‐18

28‐Feb‐18

28‐Feb‐18

95%

95%

0%

0.093%

811

8

PIPING

3963‐FAHN‐5‐52‐0002

OT

DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.2 PIPING GA EL.24.050 & ABOVE 

1

A

0.098%

5‐Aug‐17

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

10‐Dec‐17

13‐Dec‐17

12‐Feb‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

19‐Oct‐17

10‐Dec‐17

13‐Dec‐17

12‐Feb‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.093%

0.093%

812

8

PIPING

3963‐JALM‐5‐52‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.1 EL.63.000 TO 67.000 

1

1

0.140%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

26‐Dec‐17

28‐Dec‐17

4‐Mar‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

8‐Jul‐17

26‐Dec‐17

28‐Dec‐17

4‐Mar‐18

22‐Mar‐18

22‐Mar‐18

95%

95%

0%

0.133%

0.133%

813

8

PIPING

3963‐JALM‐5‐52‐0002

OT

DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.2 EL.67.000 TO OVER 

1

1

0.140%

11‐Jul‐17

21‐Jul‐17

26‐Jul‐17

26‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

8‐Jul‐17

30‐Dec‐17

2‐Jan‐18

6‐Mar‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

8‐Jul‐17

30‐Dec‐17

2‐Jan‐18

6‐Mar‐18

22‐Mar‐18

22‐Mar‐18

95%

95%

0%

0.133%

0.133%

814

8

PIPING

3963‐KAHM‐5‐52‐0001

OT

1

31‐May‐17

10‐Jun‐17

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.1 EL.101.523 & ABOVE 

1

31‐Oct‐18

31‐May‐17

7‐Dec‐17

9‐Dec‐17

25‐Jan‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

31‐May‐17

7‐Dec‐17

9‐Dec‐17

25‐Jan‐18

18‐Mar‐18

95%

95%

0%

0.143%

0.143%

815

8

PIPING

3963‐KAHM‐5‐52‐0003

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.3 EL. 99.143 TO 101.523

1

A

0.151%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

8‐Dec‐17

10‐Dec‐17

21‐Jan‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

31‐May‐17

8‐Dec‐17

10‐Dec‐17

21‐Jan‐18

22‐Mar‐18

22‐Mar‐18

95%

95%

0%

0.143%

0.143%

8

PIPING

3963‐KAHM‐5‐52‐0005

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.5 EL. 99.143 & ABOVE 

1

A

0.151%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

7‐Dec‐17

9‐Dec‐17

25‐Jan‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

31‐May‐17

7‐Dec‐17

9‐Dec‐17

25‐Jan‐18

22‐Mar‐18

22‐Mar‐18

95%

95%

0%

0.143%

0.143%

817

8

PIPING

3963‐KAHM‐5‐52‐0008

OT

DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.8 EL.99.863 & ABOVE 

1

0.075%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

24‐Oct‐17

26‐Oct‐17

21‐Jan‐18

12‐Feb‐18

12‐Feb‐18

22‐Jul‐19

1‐Jun‐17

24‐Oct‐17

26‐Oct‐17

21‐Jan‐18

12‐Feb‐18

12‐Feb‐18

95%

0%

0.072%

0.072%

818

8

PIPING

3963‐KAHN‐5‐52‐0002

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.2 EL.105.500 & ABOVE

1

A

0.529%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Jul‐17

28‐Nov‐17

30‐Nov‐17

17‐Jan‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

19‐Jul‐17

28‐Nov‐17

30‐Nov‐17

17‐Jan‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.503%

819

8

PIPING

3963‐KAHN‐5‐52‐0003

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.3 EL.103.590 TO EL.105

1

A

0.084%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

15‐Jul‐17

8‐Dec‐17

10‐Dec‐17

25‐Jan‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

15‐Jul‐17

8‐Dec‐17

10‐Dec‐17

25‐Jan‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.080%

0.080%

820

8

PIPING

3963‐KAHN‐5‐52‐0004

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.4 EL.105.500 & ABOVE

1

A

0.070%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

20‐Jul‐17

28‐Nov‐17

30‐Nov‐17

25‐Jan‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

20‐Jul‐17

28‐Nov‐17

30‐Nov‐17

25‐Jan‐18

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.067%

0.067%

821

8

PIPING

3963‐KAHS‐5‐52‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.1 EL.26.000 TO 28.380

1

1

0.098%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

29‐Jun‐17

12‐Dec‐17

14‐Dec‐17

21‐Jan‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

29‐Jun‐17

12‐Dec‐17

14‐Dec‐17

21‐Jan‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.093%

0.093%

822

8

PIPING

3963‐KAHS‐5‐52‐0002

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.2 EL.26.000 TO 28.380

1

1

0.140%

25‐Jun‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

29‐Jun‐17

18‐Dec‐17

20‐Dec‐17

21‐Jan‐18

29‐Jun‐17

18‐Dec‐17

20‐Dec‐17

21‐Jan‐18

18‐Mar‐18

18‐Mar‐18

823

8

PIPING

3963‐KAHS‐5‐52‐0003

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.3 EL.28.380 & ABOVE

1

1

0.084%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

29‐Jun‐17

11‐Dec‐17

13‐Dec‐17

21‐Jan‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

29‐Jun‐17

11‐Dec‐17

13‐Dec‐17

21‐Jan‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.080%

0.080%

824

8

PIPING

3963‐FAHM‐5‐52‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.1 EL.60.600 TO 63.050

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

4‐Dec‐17

6‐Dec‐17

1‐Feb‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

19‐Oct‐17

4‐Dec‐17

6‐Dec‐17

1‐Feb‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.093%

0.093%

825

8

PIPING

3963‐FAHM‐5‐52‐0002

OT

DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.2 EL.63.050 & ABOVE

1

B

0.098%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

3‐Dec‐17

5‐Dec‐17

5‐Feb‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

19‐Oct‐17

3‐Dec‐17

5‐Dec‐17

5‐Feb‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.093%

0.093%

826

15‐Jan‐18

21‐Feb‐18

21‐Feb‐18

5‐Jul‐17

10‐Jul‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

22‐Jul‐19

3963‐KAHN‐5‐52‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.1 EL.103.590 TO EL.105

1

A

0.423%

15‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

30‐Nov‐17

15‐Jan‐18

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

3963‐DGEN‐5‐14‐0007

OT

TECHNICAL SPECIFICATION FOR NEW 3 PHASE TEST SEPARATOR

1

A

0.125%

11‐Apr‐17

21‐Apr‐17

26‐Apr‐17

27‐May‐17

17‐Jun‐17

27‐Jun‐17

31‐Oct‐18

5‐Apr‐17

25‐Apr‐17

27‐Apr‐17

22‐Jun‐17

2‐Aug‐17

3‐Aug‐17

22‐Jul‐19

5‐Apr‐17

25‐Apr‐17

27‐Apr‐17

22‐Jun‐17

2‐Aug‐17

3‐Aug‐17

95%

95%

0%

0.119%

0.119%

MECHANICAL

3963‐DGEN‐5‐15‐0005

OT

MATERIAL REQUISITION FOR SEPARATOR EQUIPMENT

1

A

0.083%

30‐Apr‐17

10‐May‐17

15‐May‐17

15‐Jun‐17

6‐Jul‐17

16‐Jul‐17

31‐Oct‐18

11‐May‐17

24‐May‐17

25‐May‐17

27‐Jun‐17

30‐Jul‐17

31‐Jul‐17

22‐Jul‐19

11‐May‐17

24‐May‐17

25‐May‐17

27‐Jun‐17

30‐Jul‐17

31‐Jul‐17

95%

95%

0%

0.079%

0.079%

16‐Sep‐17

MECHANICAL

3963‐DGEN‐5‐17‐0005

4‐Sep‐17

13‐Sep‐17

3‐Aug‐17

8‐Aug‐17

10‐Aug‐17

22‐Aug‐17

1‐Oct‐17

3‐Aug‐17

8‐Aug‐17

10‐Aug‐17

22‐Aug‐17

1‐Oct‐17

6

MECHANICAL

3963‐DGEN‐5‐13‐0007

OT

MECHANICAL DATA SHEETS FOR SEPARATOR EQUIPMENT

1

A

0.125%

23‐Apr‐17

3‐May‐17

8‐May‐17

8‐Jun‐17

29‐Jun‐17

9‐Jul‐17

31‐Oct‐18

27‐Apr‐17

23‐May‐17

25‐May‐17

27‐Jun‐17

2‐Aug‐17

3‐Aug‐17

22‐Jul‐19

27‐Apr‐17

23‐May‐17

25‐May‐17

27‐Jun‐17

2‐Aug‐17

3‐Aug‐17

95%

95%

0%

0.119%

0.119%

MECHANICAL

3963‐DGEN‐5‐14‐0008

OT

SPECIFICATION FOR PRESSURE RELIEF VALVES

1

A

0.125%

11‐May‐17

23‐May‐17

28‐May‐17

28‐Jun‐17

19‐Jul‐17

29‐Jul‐17

31‐Oct‐18

24‐Apr‐17

29‐Apr‐17

2‐May‐17

6‐Jun‐17

6‐Jun‐17

14‐Sep‐17

22‐Jul‐19

24‐Apr‐17

29‐Apr‐17

2‐May‐17

6‐Jun‐17

6‐Jun‐17

14‐Sep‐17

95%

95%

0%

0.119%

0.119%

0.083%

11‐May‐17

7‐May‐17

9‐May‐17

10‐May‐17

7‐May‐17

9‐May‐17

10‐May‐17

3963‐DGEN‐5‐17‐0007

OT

MATERIAL SELECTION REPORT (SEPARATORS)

OT

DATA SHEET FOR PRESSURE RELIEF VALVES (KAHM)

1

A

0.125%

6‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

22‐Jul‐19

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

95%

95%

0%

0.119%

0.119%

3963‐KAHN‐5‐13‐0001

OT

DATA SHEET FOR PRESSURE RELIEF VALVES (KAHN)

1

A

0.125%

6‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

22‐Jul‐19

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

95%

95%

0%

0.119%

0.119%

835

6

MECHANICAL

3963‐KAHS‐5‐13‐0001

OT

DATA SHEET FOR PRESSURE RELIEF VALVES (KAHS)

1

A

0.125%

6‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

22‐Jul‐19

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

95%

95%

0%

0.119%

0.119% 0.119%

26‐Jul‐17

22‐Jul‐19

5‐Jun‐17

25‐Jul‐17

26‐Jul‐17

95%

95%

0%

0.079%

0.079%

836

6

MECHANICAL

3963‐FAHM‐5‐13‐0001

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

22‐Jul‐19

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

95%

95%

0%

0.119%

837

6

MECHANICAL

3963‐FAHN‐5‐13‐0001

OT

DATA SHEET FOR PRESSURE RELIEF VALVES (FAHN)

1

A

0.125%

6‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

22‐Jul‐19

10‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

95%

95%

0%

0.119%

838

6

MECHANICAL

3963‐FAHS‐5‐13‐0001

OT

DATA SHEET FOR PRESSURE RELIEF VALVES (FAHS)

1

A

0.125%

6‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

25‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

22‐Jul‐19

25‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

95%

95%

0%

0.119%

0.119%

839

6

MECHANICAL

3963‐JALM‐5‐13‐0001

OT

DATA SHEET FOR PRESSURE RELIEF VALVES (JALM)

1

A

0.125%

6‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

25‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

22‐Jul‐19

25‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Sep‐17

20‐Sep‐17

2‐Nov‐17

95%

95%

0%

0.119%

0.119%

840

6

MECHANICAL

3963‐DGEN‐5‐15‐0006

OT

MATERIAL REQUISITION FOR PRESSURE RELIEF VALVES

1

A

0.069%

3‐Jun‐17

13‐Jun‐17

18‐Jun‐17

19‐Jul‐17

9‐Aug‐17

19‐Aug‐17

31‐Oct‐18

8‐Jun‐17

20‐Jun‐17

22‐Jun‐17

18‐Aug‐17

18‐Oct‐17

19‐Oct‐17

22‐Jul‐19

8‐Jun‐17

20‐Jun‐17

22‐Jun‐17

18‐Aug‐17

18‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.066%

0.066%

841

6

MECHANICAL

A

26‐Nov‐17

26‐Dec‐17

26‐Dec‐17

22‐Jul‐19

19‐Oct‐17

24‐Nov‐17

26‐Nov‐17

26‐Dec‐17

TECHNICAL BID EVALUATION FOR PRESSURE RELIEF VALVES

1

842

3

MECHANICAL

3963‐DGEN‐5‐00‐0002

OT

MISCELLANEOUS ‐ MECHANICAL

0

843

3

ELECTRICAL

3963‐DGEN‐2‐14‐0001

OT

SPECIFICATION FOR ELECTRICAL POWER, CONTROL CABLES 

1

3963‐DGEN‐2‐14‐0002

OT

SPECIFICATION FOR ELECTRICAL BULK MATERIALS

844

A

15‐Aug‐17

20‐Aug‐17

9‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

24‐Nov‐17

26‐Dec‐17

95%

95%

0%

0.230%

0.230%

0.022%

0.242%

14‐Sep‐17

14‐Sep‐17

14‐Sep‐17

14‐Sep‐17

14‐Sep‐17

14‐Sep‐17

14‐Sep‐17

1‐Feb‐18

6‐Feb‐18

1‐Mar‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

22‐Jul‐19

1‐Feb‐18

6‐Feb‐18

1‐Mar‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

95%

95%

0%

0.021%

0.021%

0.111%

17‐Mar‐17

27‐Mar‐17

1‐Apr‐17

2‐May‐17

23‐May‐17

2‐Jun‐17

31‐Oct‐18

15‐Mar‐17

4‐Apr‐17

12‐Apr‐17

26‐Apr‐17

23‐May‐17

23‐May‐17

22‐Jul‐19

15‐Mar‐17

4‐Apr‐17

12‐Apr‐17

26‐Apr‐17

23‐May‐17

23‐May‐17

95%

95%

0%

0.106%

0.106%

0.111%

5‐Aug‐17

9‐Apr‐17

26‐Dec‐17

25‐Mar‐17

4‐Apr‐17

10‐May‐17

31‐May‐17

31‐Oct‐18

29‐Mar‐17

3‐Apr‐17

12‐Apr‐17

26‐Apr‐17

26‐Apr‐17

26‐Apr‐17

22‐Jul‐19

29‐Mar‐17

3‐Apr‐17

12‐Apr‐17

26‐Apr‐17

26‐Apr‐17

26‐Apr‐17

3

ELECTRICAL

3963‐DGEN‐2‐13‐0001

OT

DATA SHEET FOR LV CABLES & EARTHING CABLES

1

A

0.097%

17‐Mar‐17

27‐Mar‐17

1‐Apr‐17

2‐May‐17

23‐May‐17

2‐Jun‐17

31‐Oct‐18

15‐Mar‐17

3‐Apr‐17

5‐Apr‐17

26‐Apr‐17

7‐May‐17

7‐May‐17

22‐Jul‐19

15‐Mar‐17

3‐Apr‐17

5‐Apr‐17

26‐Apr‐17

7‐May‐17

7‐May‐17

95%

95%

0%

0.092%

0.092%

ELECTRICAL

3963‐DGEN‐2‐80‐0001

OT

TYPICAL INSTALLATION DETAILS DRAWINGS FOR POWER

1

A

0.153%

29‐Mar‐17

8‐Apr‐17

13‐Apr‐17

14‐May‐17

4‐Jun‐17

14‐Jun‐17

31‐Oct‐18

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

26‐Apr‐17

7‐May‐17

7‐May‐17

22‐Jul‐19

4‐Apr‐17

6‐Apr‐17

9‐Apr‐17

26‐Apr‐17

7‐May‐17

7‐May‐17

95%

95%

0%

0.145%

0.145%

0.106%

3963‐DGEN‐2‐80‐0002

OT

TYPICAL INSTALLATION DETAILS DRAWINGS FOR EARTHING

1

A

0.153%

29‐Mar‐17

8‐Apr‐17

13‐Apr‐17

14‐May‐17

14‐Jun‐17

31‐Oct‐18

9‐Apr‐17

3‐May‐17

3‐May‐17

3‐May‐17

22‐Jul‐19

9‐Apr‐17

3‐May‐17

3‐May‐17

3‐May‐17

95%

95%

0%

0.145%

0.145%

ELECTRICAL

3963‐DGEN‐2‐80‐0003

OT

TYPICAL INSTALLATION DETAILS DRAWINGS FOR LIGHTING

1

A

0.153%

5‐Apr‐17

15‐Apr‐17

20‐Apr‐17

21‐May‐17

11‐Jun‐17

21‐Jun‐17

31‐Oct‐18

5‐Apr‐17

6‐Apr‐17

9‐Apr‐17

3‐May‐17

3‐May‐17

3‐May‐17

22‐Jul‐19

5‐Apr‐17

6‐Apr‐17

9‐Apr‐17

3‐May‐17

3‐May‐17

3‐May‐17

95%

95%

0%

0.145%

0.145%

ELECTRICAL

3963‐KAHM‐2‐34‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 ELECTRICAL LOAD SCHEDULE

1

B

0.097%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

23‐Aug‐17

10‐Sep‐17

17‐Sep‐17

31‐Oct‐18

6‐May‐17

8‐May‐17

9‐May‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

22‐Jul‐19

6‐May‐17

8‐May‐17

9‐May‐17

5‐Oct‐17

5‐Oct‐17

5‐Oct‐17

95%

95%

0%

0.092%

0.092%

850

3

ELECTRICAL

3963‐KAHM‐2‐36‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 ELECTRICAL TIE‐IN SCHEDULE

1

A

0.083%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

31‐Oct‐18

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

4‐Dec‐17

22‐Jul‐19

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

4‐Dec‐17

95%

95%

0%

0.079%

0.079%

851

3

ELECTRICAL

3963‐KAHM‐2‐37‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 ELECTRICAL CABLE SCHEDULE

1

A

0.097%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

25‐May‐17

29‐May‐17

30‐May‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

22‐Jul‐19

25‐May‐17

29‐May‐17

30‐May‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

95%

95%

0%

0.092%

0.092%

852

3

ELECTRICAL

3963‐KAHM‐2‐54‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 24MCC‐2601 MOTOR CONTROL CENTER SINGLE LINE DIAGRAM

1

B

0.097%

8‐Jun‐17

18‐Jun‐17

23‐Jun‐17

24‐Jul‐17

14‐Aug‐17

24‐Aug‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

12‐Jun‐17

24‐Sep‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

12‐Jun‐17

24‐Sep‐17

95%

95%

0%

0.092%

0.092%

853

3

ELECTRICAL

3963‐KAHM‐2‐54‐0002

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 24‐DB‐2604 DISTRIBUTION BOARD SINGLE LINE DIAGRAM‐415V

1

A

0.097%

8‐Jun‐17

18‐Jun‐17

23‐Jun‐17

24‐Jul‐17

14‐Aug‐17

24‐Aug‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

3‐Aug‐17

22‐Aug‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

3‐Aug‐17

22‐Aug‐17

95%

95%

0%

0.092%

0.092%

854

3

ELECTRICAL

3963‐KAHM‐2‐54‐0003

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 24UPS‐2605(CLASS A UPS) S.L.D INSTRUMENT UPS 240V A.C.

1

A

0.097%

8‐Jun‐17

18‐Jun‐17

23‐Jun‐17

24‐Jul‐17

14‐Aug‐17

24‐Aug‐17

31‐Oct‐18

10‐May‐17

11‐May‐17

11‐May‐17

5‐Jun‐17

13‐Jun‐17

24‐Sep‐17

22‐Jul‐19

10‐May‐17

11‐May‐17

11‐May‐17

5‐Jun‐17

13‐Jun‐17

24‐Sep‐17

95%

95%

0%

0.092%

855

3

ELECTRICAL

3963‐KAHM‐2‐64‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 CABLE ROUTING LAYOUT

1

A

0.111%

30‐Jun‐17

10‐Jul‐17

15‐Jul‐17

15‐Aug‐17

5‐Sep‐17

15‐Sep‐17

31‐Oct‐18

17‐Jun‐17

18‐Jun‐17

19‐Jun‐17

2‐Aug‐17

3‐Aug‐17

2‐Nov‐17

22‐Jul‐19

17‐Jun‐17

18‐Jun‐17

19‐Jun‐17

2‐Aug‐17

3‐Aug‐17

2‐Nov‐17

95%

95%

0%

0.106%

0.106%

856

3

ELECTRICAL

3963‐KAHM‐2‐65‐0002

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 EARTHING LAYOUT

1

A

0.097%

30‐Jun‐17

10‐Jul‐17

15‐Jul‐17

15‐Aug‐17

5‐Sep‐17

15‐Sep‐17

31‐Oct‐18

2‐Jul‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

20‐Sep‐17

20‐Sep‐17

22‐Jul‐19

2‐Jul‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

20‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.092%

0.092%

857

3

ELECTRICAL

3963‐KAHM‐2‐67‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 LIGHTING LAYOUT

0.097%

30‐Jun‐17

10‐Jul‐17

15‐Jul‐17

15‐Aug‐17

31‐Oct‐18

27‐May‐17

27‐May‐17

28‐May‐17

22‐Jun‐17

2‐Aug‐17

3‐Aug‐17

22‐Jul‐19

27‐May‐17

27‐May‐17

28‐May‐17

22‐Jun‐17

2‐Aug‐17

3‐Aug‐17

95%

95%

0%

0.092%

0.092%

858

3

ELECTRICAL

3963‐KAHM‐2‐31‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C

3

A

0.097%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

2‐Oct‐17

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

2‐Oct‐17

95%

95%

0%

0.092%

0.092%

859

3

ELECTRICAL

3963‐KAHM‐2‐31‐0002

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, 

3

A

0.083%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Feb‐18

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Feb‐18

95%

95%

0%

0.079%

0.079%

860

3

ELECTRICAL

3963‐KAHM‐2‐17‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 POWER ADEQUACY REPORT

1

A

0.153%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

22‐Nov‐17

22‐Jul‐19

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

22‐Nov‐17

95%

95%

0%

0.145%

861

3

ELECTRICAL

3963‐KAHM‐2‐12‐0001

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 LV CABLE SIZING CALCULATION

1

B

0.111%

8‐Apr‐17

18‐Apr‐17

23‐Apr‐17

24‐May‐17

14‐Jun‐17

24‐Jun‐17

31‐Oct‐18

19‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

5‐Oct‐17

22‐Jul‐19

19‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

5‐Oct‐17

95%

95%

0%

0.106%

0.106%

862

3

ELECTRICAL

3963‐KAHM‐2‐12‐0002

OT

DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 LIGHTING CALCULATION

1

B

0.111%

18‐May‐17

28‐May‐17

2‐Jun‐17

3‐Jul‐17

24‐Jul‐17

3‐Aug‐17

31‐Oct‐18

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

19‐Jun‐17

19‐Jun‐17

19‐Jun‐17

22‐Jul‐19

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

19‐Jun‐17

19‐Jun‐17

19‐Jun‐17

95%

95%

0%

0.106%

0.106%

863

3

ELECTRICAL

3963‐KAHN‐2‐34‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 ELECTRICAL LOAD SCHEDULE

1

A

0.097%

18‐Jul‐17

28‐Jul‐17

2‐Aug‐17

20‐Aug‐17

30‐Aug‐17

9‐Sep‐17

31‐Oct‐18

4‐May‐17

3‐May‐17

4‐May‐17

5‐Jul‐17

13‐Jul‐17

18‐Sep‐17

22‐Jul‐19

4‐May‐17

3‐May‐17

4‐May‐17

5‐Jul‐17

13‐Jul‐17

18‐Sep‐17

95%

95%

0%

0.092%

0.092%

5‐Sep‐17

15‐Sep‐17

5‐Apr‐17

0.106%

3

A

2‐Apr‐17

0%

3

31‐Jul‐17

5‐Apr‐17

95%

848

21‐Jul‐17

2‐Apr‐17

95%

849

1

4‐Jun‐17

10‐Jun‐17

26‐Dec‐17

3

ELECTRICAL

1

A

845

3

ELECTRICAL

OT

0.119%

846 847

3

3963‐DGEN‐5‐17‐0008

23‐Jun‐17

25‐Jul‐17

0.158%

3963‐KAHM‐5‐13‐0001

23‐May‐17

5‐Jun‐17

0.158%

MECHANICAL

18‐May‐17

31‐Oct‐18

0%

MECHANICAL

6‐May‐17

29‐Jul‐17

95%

MECHANICAL

0.125%

19‐Jul‐17

95%

6

A

28‐Jun‐17

1‐Oct‐17

6

1

28‐May‐17

22‐Jul‐19

833

DATA SHEET FOR PRESSURE RELIEF VALVES (FAHM)

23‐May‐17

1‐Oct‐17

834

OT

A

31‐Oct‐18

0.402%

6

1

15‐Aug‐17

0.402%

830

6

10‐Aug‐17

0%

831 832

31‐Jul‐17

95%

0.133%

MECHANICAL

0.167%

95%

0.133%

PIPING

A

30‐Nov‐17

0%

6

1

28‐Nov‐17

95%

6

TECHNICAL BID EVALUATION FOR SEPARATOR EQUIPMENT

15‐Jul‐17

95%

0.503%

8

OT

28‐Nov‐17

18‐Mar‐18

95%

828

6

15‐Jul‐17

18‐Mar‐18

18‐Mar‐18

827 829

25‐Jul‐17

15‐Jun‐17

0.093%

816

A

0.151%

6‐Jun‐17

16‐Jun‐17

0%

805

10‐Apr‐17

16‐May‐17

95%

0.053%

3963‐KAHM‐5‐51‐0001

31‐Mar‐17

95%

0.053%

PIPING

0.056%

21‐Jan‐18

0%

PIPING

A

26‐Oct‐17

95%

PIPING

1

26‐Oct‐17

95%

8

DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; EQUIPMENT LOCATION PLAN

16‐Jul‐17

21‐Jan‐18

8

OT

15‐Jul‐17

21‐Jan‐18

801

8

21‐Jan‐18

22‐Jul‐19

802 803

26‐Oct‐17

21‐Jan‐18

16‐Oct‐17

PIPING

15‐Jul‐17

21‐Jan‐18

22‐Jul‐19

8

5‐Sep‐17

16‐Jul‐17

11‐Jan‐18

8

30‐Jun‐17

15‐Jul‐17

16‐Oct‐17

798

8

PIPING

3963‐KAHS‐5‐57‐0001

799 800

8

PIPING

0.067%

796 797

8

2‐Nov‐17

95%

0%

8

5‐Apr‐17

11‐Jan‐18

95%

783

3‐Sep‐18

11‐Jan‐18

95%

784

2‐Nov‐17

11‐Jan‐18

13‐Apr‐17

0.092%

0.145%

864

3

ELECTRICAL

3963‐KAHN‐2‐36‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 ELECTRICAL TIE‐IN SCHEDULE

1

A

0.097%

28‐May‐17

7‐Jun‐17

12‐Jun‐17

13‐Jul‐17

3‐Aug‐17

13‐Aug‐17

31‐Oct‐18

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

25‐Sep‐17

22‐Jul‐19

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

25‐Sep‐17

95%

95%

0%

0.092%

0.092%

865

3

ELECTRICAL

3963‐KAHN‐2‐37‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 ELECTRICAL CABLE SCHEDULE

1

A

0.097%

28‐May‐17

7‐Jun‐17

12‐Jun‐17

13‐Jul‐17

3‐Aug‐17

13‐Aug‐17

31‐Oct‐18

30‐May‐17

30‐May‐17

31‐May‐17

2‐Aug‐17

3‐Aug‐17

19‐Sep‐17

22‐Jul‐19

30‐May‐17

30‐May‐17

31‐May‐17

2‐Aug‐17

3‐Aug‐17

19‐Sep‐17

95%

95%

0%

0.092%

0.092%

866

3

ELECTRICAL

3963‐KAHN‐2‐54‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 22‐DB‐7311/7312 DISTRIBUTION BOARD SINGLE LINE DIAGRAM

1

A

0.097%

18‐Jun‐17

28‐Jun‐17

3‐Jul‐17

3‐Aug‐17

24‐Aug‐17

3‐Sep‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

3‐Aug‐17

17‐Aug‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

3‐Aug‐17

17‐Aug‐17

95%

95%

0%

0.092%

0.092%

867

3

ELECTRICAL

3963‐KAHN‐2‐54‐0002

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 22UPS‐1801 UPS 10KVA SINGLE LINE DIAGRAM‐110/240V AC

1

A

0.097%

18‐Jun‐17

28‐Jun‐17

3‐Jul‐17

3‐Aug‐17

24‐Aug‐17

3‐Sep‐17

31‐Oct‐18

11‐May‐17

11‐May‐17

11‐May‐17

5‐Jun‐17

13‐Jun‐17

25‐Sep‐17

22‐Jul‐19

11‐May‐17

11‐May‐17

11‐May‐17

5‐Jun‐17

13‐Jun‐17

25‐Sep‐17

95%

95%

0%

0.092%

0.092%

Page 7 of 13

Page 78 of 170

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC NO

ITEM CODE

DOC DESC

DOC CLASS

CURRENT REVISION

DOC CLASS 1

CURRENT REVISION A

SHUTD OWN PACKA GE SHUTD OWN

Original BL WV

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100%

ACTIAFC

ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

SRN

SEQ

DISCIPLINE

DOC NO

WV

PLS

PLD

PLASBUILT

PLS

PLD

PLIFC

PLASBUILT

ACTS

ACTD

ACTIFC

868

3

ELECTRICAL

3963‐KAHN‐2‐64‐0001

ITEM DOC DESC CODE OT DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 CABLE ROUTING LAYOUT

0.153%

18‐Jun‐17

28‐Jun‐17

3‐Jul‐17

3‐Aug‐17

24‐Aug‐17

3‐Sep‐17

31‐Oct‐18

17‐Jun‐17

18‐Jun‐17

19‐Jun‐17

2‐Aug‐17

3‐Aug‐17

29‐Oct‐17

22‐Jul‐19

17‐Jun‐17

18‐Jun‐17

19‐Jun‐17

2‐Aug‐17

3‐Aug‐17

29‐Oct‐17

869

3

ELECTRICAL

3963‐KAHN‐2‐65‐0002

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 EARTHING LAYOUT

1

A

0.111%

18‐Jul‐17

28‐Jul‐17

2‐Aug‐17

20‐Aug‐17

30‐Aug‐17

9‐Sep‐17

31‐Oct‐18

2‐Jul‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

20‐Sep‐17

20‐Sep‐17

22‐Jul‐19

2‐Jul‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

20‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.106%

0.106%

870

3

ELECTRICAL

3963‐KAHN‐2‐67‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 LIGHTING LAYOUT

1

A

0.097%

18‐Jul‐17

28‐Jul‐17

2‐Aug‐17

20‐Aug‐17

30‐Aug‐17

9‐Sep‐17

31‐Oct‐18

22‐May‐17

23‐May‐17

25‐May‐17

13‐Jun‐17

21‐Jun‐17

3‐Aug‐17

22‐Jul‐19

22‐May‐17

23‐May‐17

25‐May‐17

13‐Jun‐17

21‐Jun‐17

3‐Aug‐17

95%

95%

0%

0.092%

0.092%

871

3

ELECTRICAL

3963‐KAHN‐2‐31‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING

3

A

0.097%

8‐Jul‐17

18‐Jul‐17

6‐Aug‐17

11‐Aug‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

19‐Oct‐17

22‐Jul‐19

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

19‐Oct‐17

95%

95%

0%

0.092%

0.092%

872

3

ELECTRICAL

3963‐KAHN‐2‐31‐0002

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING

3

A

0.083%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Feb‐18

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Feb‐18

95%

95%

0%

0.079%

873

3

ELECTRICAL

3963‐KAHN‐2‐17‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 POWER ADEQUACY REPORT

1

A

0.153%

30‐May‐17

9‐Jun‐17

14‐Jun‐17

15‐Jul‐17

5‐Aug‐17

15‐Aug‐17

31‐Oct‐18

1‐Jun‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

24‐Sep‐17

22‐Jul‐19

1‐Jun‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

24‐Sep‐17

95%

95%

0%

0.145%

0.145%

874

3

ELECTRICAL

3963‐KAHN‐2‐12‐0001

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 LV CABLE SIZING CALCULATION

1

A

0.111%

15‐Apr‐17

25‐Apr‐17

30‐Apr‐17

31‐May‐17

21‐Jun‐17

1‐Jul‐17

31‐Oct‐18

19‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

5‐Oct‐17

22‐Jul‐19

19‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

5‐Oct‐17

95%

95%

0%

0.106%

0.106%

875

3

ELECTRICAL

3963‐KAHN‐2‐12‐0002

OT

DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 LIGHTING CALCULATION

1

A

0.111%

28‐May‐17

7‐Jun‐17

12‐Jun‐17

13‐Jul‐17

3‐Aug‐17

13‐Aug‐17

31‐Oct‐18

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

5‐Jun‐17

13‐Jun‐17

19‐Sep‐17

22‐Jul‐19

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

5‐Jun‐17

13‐Jun‐17

19‐Sep‐17

95%

95%

0%

0.106%

0.106%

1

A

0.097%

15‐Jun‐17

25‐Jun‐17

30‐Jun‐17

31‐Jul‐17

21‐Aug‐17

31‐Aug‐17

31‐Oct‐18

PLIFC

23‐Jul‐17

PLIFA

PLIAWH

PLIAFC

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

3963‐KAHS‐2‐34‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 ELECTRICAL LOAD SCHEDULE

20‐Sep‐17

95%

95%

0%

0.092%

0.092%

3963‐KAHS‐2‐36‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 ELECTRICAL TIE‐IN SCHEDULE

1

A

0.097%

25‐Jul‐17

4‐Aug‐17

9‐Aug‐17

27‐Aug‐17

6‐Sep‐17

16‐Sep‐17

31‐Oct‐18

16‐May‐17

17‐May‐17

17‐May‐17

2‐Aug‐17

3‐Aug‐17

25‐Sep‐17

22‐Jul‐19

16‐May‐17

17‐May‐17

17‐May‐17

2‐Aug‐17

3‐Aug‐17

25‐Sep‐17

95%

95%

0%

0.092%

0.092%

3963‐KAHS‐2‐37‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 ELECTRICAL CABLE SCHEDULE

1

A

0.097%

25‐Jul‐17

4‐Aug‐17

9‐Aug‐17

27‐Aug‐17

6‐Sep‐17

16‐Sep‐17

31‐Oct‐18

30‐May‐17

30‐May‐17

31‐May‐17

2‐Aug‐17

3‐Aug‐17

19‐Sep‐17

22‐Jul‐19

30‐May‐17

30‐May‐17

31‐May‐17

2‐Aug‐17

3‐Aug‐17

19‐Sep‐17

95%

95%

0%

0.092%

0.092%

879

3

ELECTRICAL

3963‐KAHS‐2‐54‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 23‐SB‐7220 SWITCHBOARD SINGLE LINE DIAGRAM‐415V SYSTE

1

3

0.083%

4‐Jun‐17

14‐Jun‐17

19‐Jun‐17

20‐Jul‐17

10‐Aug‐17

20‐Aug‐17

31‐Oct‐18

11‐May‐17

11‐May‐17

11‐May‐17

5‐Jun‐17

13‐Jun‐17

19‐Sep‐17

22‐Jul‐19

11‐May‐17

11‐May‐17

11‐May‐17

5‐Jun‐17

13‐Jun‐17

19‐Sep‐17

95%

95%

0%

0.079%

0.079%

880

3

ELECTRICAL

3963‐KAHS‐2‐54‐0002

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 23‐DB‐0001/0002‐ DISTRIBUTION BOARD SINGLE LINE DIAGRA

1

A

0.097%

4‐Jun‐17

14‐Jun‐17

19‐Jun‐17

20‐Jul‐17

10‐Aug‐17

20‐Aug‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

12‐Jun‐17

22‐Aug‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

12‐Jun‐17

22‐Aug‐17

95%

95%

0%

0.092%

0.092%

881

3

ELECTRICAL

3963‐KAHS‐2‐54‐0003

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 23‐UPS‐7701,15KVA SINGLE LINE DIAGRAM‐110/240V AC SYST

1

A

0.097%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

11‐May‐17

11‐May‐17

11‐May‐17

5‐Jun‐17

3‐Aug‐17

20‐Sep‐17

22‐Jul‐19

11‐May‐17

11‐May‐17

11‐May‐17

5‐Jun‐17

3‐Aug‐17

20‐Sep‐17

95%

95%

0%

0.092%

0.092%

15‐Jul‐17

20‐Jul‐17

5‐Jul‐17

20‐Aug‐17

10‐Sep‐17

2‐Aug‐17

3‐Aug‐17

8‐Nov‐17

2‐Aug‐17

3‐Aug‐17

8‐Nov‐17

3

ELECTRICAL

3963‐KAHS‐2‐65‐0002

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 EARTHING LAYOUT

1

A

0.097%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jun‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

20‐Sep‐17

20‐Sep‐17

22‐Jul‐19

28‐Jun‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

20‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.092%

0.092%

3

ELECTRICAL

3963‐KAHS‐2‐67‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 LIGHTING LAYOUT

1

A

0.097%

30‐Jun‐17

10‐Jul‐17

15‐Jul‐17

15‐Aug‐17

5‐Sep‐17

15‐Sep‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

22‐Jun‐17

2‐Aug‐17

3‐Aug‐17

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

22‐Jun‐17

2‐Aug‐17

3‐Aug‐17

95%

95%

0%

0.092%

0.092%

6‐Jul‐17

0.092%

22‐Jul‐19

17‐Jun‐17

95%

95%

0%

0.106%

0.106%

3

ELECTRICAL

3963‐KAHS‐2‐31‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING 

3

A

0.097%

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

20‐Sep‐17

5‐Oct‐17

19‐Oct‐17

22‐Jul‐19

6‐Jul‐17

20‐Sep‐17

5‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.092%

ELECTRICAL

3963‐KAHS‐2‐31‐0002

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING

3

A

0.083%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

8‐Jul‐17

8‐Jul‐17

9‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Feb‐18

22‐Jul‐19

8‐Jul‐17

8‐Jul‐17

9‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Feb‐18

95%

95%

0%

0.079%

3

ELECTRICAL

3963‐KAHS‐2‐17‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 POWER ADEQUACY REPORT

1

A

0.153%

22‐Apr‐17

2‐May‐17

7‐May‐17

7‐Jun‐17

28‐Jun‐17

8‐Jul‐17

31‐Oct‐18

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

20‐Sep‐17

22‐Jul‐19

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

20‐Sep‐17

95%

95%

0%

0.145%

0.145%

888

3

ELECTRICAL

3963‐KAHS‐2‐12‐0001

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 LV CABLE SIZING CALCULATION

1

A

0.111%

7‐Jul‐17

17‐Jul‐17

22‐Jul‐17

22‐Aug‐17

9‐Sep‐17

16‐Sep‐17

31‐Oct‐18

22‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

28‐Sep‐17

22‐Jul‐19

22‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

28‐Sep‐17

95%

95%

0%

0.106%

0.106%

889

3

ELECTRICAL

3963‐KAHS‐2‐12‐0002

OT

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 LIGHTING CALCULATION

1

A

0.111%

7‐Jul‐17

17‐Jul‐17

22‐Jul‐17

22‐Aug‐17

9‐Sep‐17

16‐Sep‐17

31‐Oct‐18

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

5‐Jun‐17

13‐Jun‐17

19‐Sep‐17

22‐Jul‐19

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

5‐Jun‐17

13‐Jun‐17

19‐Sep‐17

95%

95%

0%

0.106%

0.106%

890

3

ELECTRICAL

3963‐FAHM‐2‐34‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 ELECTRICAL LOAD SCHEDULE

1

A

0.097%

17‐Apr‐17

2‐Jun‐17

23‐Jun‐17

30‐Apr‐17

3‐May‐17

5‐Jul‐17

3‐Aug‐17

20‐Sep‐17

22‐Jul‐19

30‐Apr‐17

3‐May‐17

5‐Jul‐17

3‐Aug‐17

891

3

ELECTRICAL

3963‐FAHM‐2‐36‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 ELECTRICAL TIE‐IN SCHEDULE

1

B

0.097%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

22‐Jun‐17

22‐Jun‐17

22‐Jul‐19

19‐Apr‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

22‐Jun‐17

22‐Jun‐17

95%

95%

0%

0.092%

0.092%

892

3

ELECTRICAL

3963‐FAHM‐2‐37‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 ELECTRICAL CABLE SCHEDULE

1

A

0.097%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

22‐May‐17

23‐May‐17

25‐May‐17

19‐Jun‐17

27‐Jun‐17

19‐Sep‐17

22‐Jul‐19

22‐May‐17

23‐May‐17

25‐May‐17

19‐Jun‐17

27‐Jun‐17

19‐Sep‐17

95%

95%

0%

0.092%

0.092%

893

3

ELECTRICAL

3963‐FAHM‐2‐54‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 14‐MCC‐2601 MOTOR CONTROL CENTRE SINGLE LINE DIAGRAM‐

1

3

0.083%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

19‐Sep‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

19‐Sep‐17

95%

95%

0%

0.079%

0.079%

894

3

ELECTRICAL

3963‐FAHM‐2‐54‐0002

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 14‐DB‐2603 ‐ DISTRIBUTION BOARD SINGLE LINE DIAGRAM‐415V 

1

B

0.097%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

19‐Jul‐17

31‐Oct‐18

9‐May‐17

10‐May‐17

1‐Jun‐17

21‐Jun‐17

21‐Jun‐17

22‐Jul‐19

9‐May‐17

10‐May‐17

1‐Jun‐17

21‐Jun‐17

21‐Jun‐17

95%

95%

0%

0.092%

0.092%

895

3

ELECTRICAL

3963‐FAHM‐2‐54‐0003

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 14‐UPS‐2605 UPS,10KVA SINGLE LINE DIAGRAM‐240V AC SYSTEM

1

A

0.097%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

14‐Jun‐17

22‐Jun‐17

20‐Sep‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

14‐Jun‐17

22‐Jun‐17

20‐Sep‐17

95%

95%

0%

0.092%

0.092%

896

3

ELECTRICAL

3963‐FAHM‐2‐64‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 CABLE ROUTING LAYOUT

1

A

0.097%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

25‐May‐17

10‐Jun‐17

11‐Jun‐17

2‐Aug‐17

3‐Aug‐17

9‐Jan‐18

22‐Jul‐19

25‐May‐17

10‐Jun‐17

11‐Jun‐17

2‐Aug‐17

3‐Aug‐17

9‐Jan‐18

95%

95%

0%

0.092%

0.092%

897

3

ELECTRICAL

3963‐FAHM‐2‐65‐0002

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 EARTHING LAYOUT

1

A

0.097%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

25‐May‐17

2‐Jul‐17

3‐Jul‐17

20‐Jul‐17

19‐Sep‐17

20‐Sep‐17

22‐Jul‐19

25‐May‐17

2‐Jul‐17

3‐Jul‐17

20‐Jul‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.092%

0.092%

13‐Jun‐17

21‐Jun‐17

13‐Jun‐17

0.092%

9‐Jul‐17

19‐Apr‐17

7‐May‐17

7‐May‐17

20‐Sep‐17

95%

95%

0%

0.092%

0.079%

0.092%

898

3

ELECTRICAL

3963‐FAHM‐2‐67‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 LIGHTING LAYOUT

1

A

0.097%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

21‐May‐17

22‐May‐17

24‐May‐17

22‐Jul‐19

21‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

3‐Aug‐17

95%

95%

0%

0.092%

899

3

ELECTRICAL

3963‐FAHM‐2‐31‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING CA

3

A

0.097%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

6‐Jul‐17

6‐Jul‐17

28‐Sep‐17

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

6‐Jul‐17

6‐Jul‐17

28‐Sep‐17

95%

95%

0%

0.092%

900

3

ELECTRICAL

3963‐FAHM‐2‐31‐0002

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, PO

3

A

0.097%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

95%

95%

0%

0.092%

0.092%

901

3

ELECTRICAL

3963‐FAHM‐2‐17‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 POWER ADEQUACY REPORT

1

A

0.153%

1‐May‐17

11‐May‐17

16‐May‐17

16‐Jun‐17

7‐Jul‐17

17‐Jul‐17

31‐Oct‐18

25‐May‐17

12‐Jun‐17

13‐Jun‐17

12‐Sep‐17

24‐Sep‐17

24‐Sep‐17

22‐Jul‐19

25‐May‐17

12‐Jun‐17

13‐Jun‐17

12‐Sep‐17

24‐Sep‐17

24‐Sep‐17

95%

95%

0%

0.145%

0.145%

902

3

ELECTRICAL

3963‐FAHM‐2‐12‐0001

OT

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 LV CABLE SIZING CALCULATION

1

A

0.111%

17‐Apr‐17

27‐Apr‐17

2‐May‐17

2‐Jun‐17

23‐Jun‐17

3‐Jul‐17

31‐Oct‐18

19‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

22‐Jun‐17

22‐Jun‐17

22‐Jul‐19

19‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

22‐Jun‐17

22‐Jun‐17

95%

95%

0%

0.106%

0.106%

ELECTRICAL

3963‐FAHM‐2‐12‐0002

17‐Apr‐17

20‐Jul‐17

17‐Apr‐17

20‐Jul‐17

903

4‐May‐17

9‐May‐17

9‐Jun‐17

18‐Sep‐17

19‐Sep‐17

22‐Jul‐19

18‐Sep‐17

19‐Sep‐17

904

3

ELECTRICAL

3963‐FAHN‐2‐34‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 ELECTRICAL LOAD SCHEDULE

1

A

0.097%

24‐Apr‐17

4‐May‐17

9‐May‐17

9‐Jun‐17

30‐Jun‐17

10‐Jul‐17

31‐Oct‐18

25‐Apr‐17

30‐Apr‐17

3‐May‐17

5‐Jul‐17

3‐Aug‐17

28‐Sep‐17

22‐Jul‐19

25‐Apr‐17

30‐Apr‐17

3‐May‐17

5‐Jul‐17

3‐Aug‐17

28‐Sep‐17

95%

95%

0%

0.092%

0.092%

3

ELECTRICAL

3963‐FAHN‐2‐36‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 ELECTRICAL TIE‐IN SCHEDULE

1

A

0.083%

24‐Apr‐17

4‐May‐17

9‐May‐17

9‐Jun‐17

30‐Jun‐17

10‐Jul‐17

31‐Oct‐18

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

7‐Dec‐17

22‐Jul‐19

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

7‐Dec‐17

95%

95%

0%

0.079%

0.079%

906

3

ELECTRICAL

3963‐FAHN‐2‐37‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 ELECTRICAL CABLE SCHEDULE

1

A

0.097%

10‐May‐17

20‐May‐17

25‐May‐17

25‐Jun‐17

16‐Jul‐17

26‐Jul‐17

31‐Oct‐18

22‐May‐17

23‐May‐17

25‐May‐17

19‐Jun‐17

27‐Jun‐17

28‐Sep‐17

22‐Jul‐19

22‐May‐17

23‐May‐17

25‐May‐17

19‐Jun‐17

27‐Jun‐17

28‐Sep‐17

95%

95%

0%

0.092%

0.092%

907

3

ELECTRICAL

3963‐FAHN‐2‐54‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 12‐SB‐0007‐EXISTING LV SWITCHBOARD SINGLE LINE DIAGRAM‐

1

B

0.083%

10‐May‐17

20‐May‐17

25‐May‐17

25‐Jun‐17

16‐Jul‐17

26‐Jul‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

24‐Sep‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

24‐Sep‐17

95%

95%

0%

0.079%

908

3

ELECTRICAL

3963‐FAHN‐2‐54‐0002

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 12‐DB‐0001/0002 ‐ EXISTING LV DISTRIBUTION BOARD SINGLE L

1

B

0.083%

10‐May‐17

20‐May‐17

25‐May‐17

25‐Jun‐17

16‐Jul‐17

26‐Jul‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

21‐Jun‐17

21‐Jun‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

21‐Jun‐17

21‐Jun‐17

95%

95%

0%

0.079%

0.079%

909

3

ELECTRICAL

3963‐FAHN‐2‐54‐0003

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 12‐UPS‐0007 UPS,5KVA SINGLE LINE DIAGRAM‐110V AC SYSTEM

1

A

0.083%

10‐May‐17

20‐May‐17

25‐May‐17

25‐Jun‐17

16‐Jul‐17

26‐Jul‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

20‐Sep‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

20‐Sep‐17

95%

95%

0%

0.079%

0.079%

910

3

ELECTRICAL

3963‐FAHN‐2‐64‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 CABLE ROUTING LAYOUT

1

A

0.097%

3‐Jun‐17

13‐Jun‐17

18‐Jun‐17

19‐Jul‐17

9‐Aug‐17

19‐Aug‐17

31‐Oct‐18

7‐Jun‐17

14‐Jun‐17

15‐Jun‐17

2‐Aug‐17

3‐Aug‐17

4‐Dec‐17

22‐Jul‐19

7‐Jun‐17

14‐Jun‐17

15‐Jun‐17

2‐Aug‐17

3‐Aug‐17

4‐Dec‐17

95%

95%

0%

0.092%

0.092%

9‐Aug‐17

0.111%

24‐Apr‐17

30‐Jun‐17

10‐Jul‐17

31‐Oct‐18

14‐Apr‐17

14‐Apr‐17

14‐Apr‐17

95%

95%

0%

0.106%

0.106%

0.079%

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 EARTHING LAYOUT

1

A

0.083%

3‐Jun‐17

13‐Jun‐17

18‐Jun‐17

19‐Jul‐17

19‐Aug‐17

31‐Oct‐18

7‐Jun‐17

3‐Jul‐17

4‐Jul‐17

20‐Jul‐17

19‐Sep‐17

22‐Jul‐19

7‐Jun‐17

3‐Jul‐17

4‐Jul‐17

20‐Jul‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.079%

0.079%

ELECTRICAL

3963‐FAHN‐2‐67‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 LIGHTING LAYOUT

1

A

0.083%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

22‐May‐17

23‐May‐17

25‐May‐17

21‐Jun‐17

29‐Jun‐17

3‐Aug‐17

22‐Jul‐19

22‐May‐17

23‐May‐17

25‐May‐17

21‐Jun‐17

29‐Jun‐17

3‐Aug‐17

95%

95%

0%

0.079%

0.079%

ELECTRICAL

3963‐FAHN‐2‐31‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C

3

A

0.083%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

95%

95%

0%

0.079%

0.079%

914

3

ELECTRICAL

3963‐FAHN‐2‐31‐0002

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, 

3

A

0.083%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

1‐Oct‐17

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

1‐Oct‐17

95%

95%

0%

0.079%

915

3

ELECTRICAL

3963‐FAHN‐2‐17‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 POWER ADEQUACY REPORT

1

A

0.153%

8‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

19‐Oct‐17

22‐Jul‐19

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

19‐Oct‐17

95%

95%

0%

0.145%

0.145%

916

3

ELECTRICAL

3963‐FAHN‐2‐12‐0001

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 LV CABLE SIZING CALCULATION

1

A

0.111%

24‐Apr‐17

4‐May‐17

9‐May‐17

9‐Jun‐17

30‐Jun‐17

10‐Jul‐17

31‐Oct‐18

22‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

28‐Sep‐17

22‐Jul‐19

22‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

28‐Sep‐17

95%

95%

0%

0.106%

0.106%

917

3

ELECTRICAL

3963‐FAHN‐2‐12‐0002

OT

DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 LIGHTING CALCULATION

1

B

0.111%

1‐May‐17

11‐May‐17

16‐May‐17

16‐Jun‐17

7‐Jul‐17

17‐Jul‐17

31‐Oct‐18

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

19‐Jun‐17

19‐Jun‐17

19‐Jun‐17

22‐Jul‐19

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

19‐Jun‐17

19‐Jun‐17

19‐Jun‐17

95%

95%

0%

0.106%

0.106%

5‐Oct‐17

22‐Jul‐19

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 ELECTRICAL LOAD SCHEDULE

1

B

11‐May‐17

16‐May‐17

16‐Jun‐17

7‐Jul‐17

17‐Jul‐17

31‐Oct‐18

5‐Jul‐17

3‐Aug‐17

5‐Jul‐17

3‐Aug‐17

919

3

ELECTRICAL

3963‐FAHS‐2‐36‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 ELECTRICAL TIE‐IN SCHEDULE

1

A

0.083%

1‐May‐17

11‐May‐17

16‐May‐17

16‐Jun‐17

7‐Jul‐17

17‐Jul‐17

31‐Oct‐18

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

7‐Dec‐17

22‐Jul‐19

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

7‐Dec‐17

95%

95%

0%

0.079%

0.079%

3

ELECTRICAL

3963‐FAHS‐2‐37‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 ELECTRICAL CABLE SCHEDULE

1

A

0.083%

18‐May‐17

28‐May‐17

2‐Jun‐17

3‐Jul‐17

24‐Jul‐17

3‐Aug‐17

31‐Oct‐18

25‐May‐17

29‐May‐17

30‐May‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

22‐Jul‐19

25‐May‐17

29‐May‐17

30‐May‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

95%

95%

0%

0.079%

0.079%

921

3

ELECTRICAL

3963‐FAHS‐2‐54‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 12‐SB‐0007‐EXISTING LV SWITCHBOARD SINGLE LINE DIAGRAM‐

1

1‐Jun‐17

9‐Jun‐17

24‐Sep‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

922

3

ELECTRICAL

3963‐FAHS‐2‐54‐0002

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 12‐DB‐0001/0002 ‐ EXISTING LV DISTRIBUTION BOARD SINGLE L

1

B

0.083%

18‐May‐17

28‐May‐17

2‐Jun‐17

3‐Jul‐17

24‐Jul‐17

3‐Aug‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

21‐Jun‐17

21‐Jun‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

21‐Jun‐17

21‐Jun‐17

95%

95%

0%

0.079%

0.079%

923

3

ELECTRICAL

3963‐FAHS‐2‐54‐0003

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 12‐UPS‐0007 UPS,5KVA SINGLE LINE DIAGRAM‐110V AC SYSTEM

1

A

0.083%

18‐May‐17

28‐May‐17

2‐Jun‐17

3‐Jul‐17

24‐Jul‐17

3‐Aug‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

20‐Sep‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

9‐Jun‐17

20‐Sep‐17

95%

95%

0%

0.079%

0.079%

924

3

ELECTRICAL

3963‐FAHS‐2‐64‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 CABLE ROUTING LAYOUT

1

A

0.111%

10‐Jun‐17

20‐Jun‐17

25‐Jun‐17

26‐Jul‐17

16‐Aug‐17

26‐Aug‐17

31‐Oct‐18

17‐Jun‐17

18‐Jun‐17

19‐Jun‐17

2‐Aug‐17

3‐Aug‐17

8‐Nov‐17

22‐Jul‐19

17‐Jun‐17

18‐Jun‐17

19‐Jun‐17

2‐Aug‐17

3‐Aug‐17

8‐Nov‐17

95%

95%

0%

0.106%

0.106%

0.083%

1‐May‐17

18‐May‐17

28‐May‐17

2‐Jun‐17

3‐Jul‐17

24‐Jul‐17

3‐Aug‐17

31‐Oct‐18

25‐Apr‐17

7‐May‐17

30‐Apr‐17

9‐May‐17

3‐May‐17

10‐May‐17

30‐Apr‐17

3‐May‐17

5‐Oct‐17

24‐Sep‐17

95%

95%

95%

95%

0%

0%

0.079%

0.079%

0.079%

0.079%

925

3

ELECTRICAL

3963‐FAHS‐2‐65‐0002

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 EARTHING LAYOUT

1

A

0.083%

10‐Jun‐17

20‐Jun‐17

25‐Jun‐17

26‐Jul‐17

16‐Aug‐17

26‐Aug‐17

31‐Oct‐18

2‐Jul‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

19‐Sep‐17

22‐Jul‐19

2‐Jul‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.079%

0.079%

926

3

ELECTRICAL

3963‐FAHS‐2‐67‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 LIGHTING LAYOUT

1

A

0.083%

10‐Jun‐17

20‐Jun‐17

25‐Jun‐17

26‐Jul‐17

16‐Aug‐17

26‐Aug‐17

31‐Oct‐18

27‐May‐17

27‐May‐17

28‐May‐17

21‐Jun‐17

29‐Jun‐17

3‐Aug‐17

22‐Jul‐19

27‐May‐17

27‐May‐17

28‐May‐17

21‐Jun‐17

29‐Jun‐17

3‐Aug‐17

95%

95%

0%

0.079%

0.079%

927

3

ELECTRICAL

3963‐FAHS‐2‐31‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C

3

A

0.083%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

95%

95%

0%

0.079%

0.079%

928

3

ELECTRICAL

3963‐FAHS‐2‐31‐0002

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, P

3

A

0.083%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

2‐Oct‐17

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

2‐Aug‐17

3‐Aug‐17

2‐Oct‐17

95%

95%

0%

0.079%

0.079%

929

3

ELECTRICAL

3963‐FAHS‐2‐17‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 POWER ADEQUACY REPORT

1

A

0.153%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

7‐Dec‐17

22‐Jul‐19

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

7‐Dec‐17

95%

95%

0%

0.145%

930

3

ELECTRICAL

3963‐FAHS‐2‐12‐0001

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 LV CABLE SIZING CALCULATION

1

A

0.111%

1‐May‐17

11‐May‐17

16‐May‐17

16‐Jun‐17

7‐Jul‐17

17‐Jul‐17

31‐Oct‐18

22‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

28‐Sep‐17

22‐Jul‐19

22‐Apr‐17

22‐Apr‐17

24‐Apr‐17

17‐May‐17

25‐May‐17

28‐Sep‐17

95%

95%

0%

0.106%

0.106%

931

3

ELECTRICAL

3963‐FAHS‐2‐12‐0002

OT

DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 LIGHTING CALCULATION

1

A

0.111%

8‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

20‐Jul‐17

18‐Sep‐17

19‐Sep‐17

22‐Jul‐19

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

20‐Jul‐17

18‐Sep‐17

19‐Sep‐17

95%

95%

0%

0.106%

0.106%

932

3

ELECTRICAL

3963‐JALM‐2‐34‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 ELECTRICAL LOAD SCHEDULE

1

A

0.083%

30‐Jun‐17

10‐Jul‐17

15‐Jul‐17

15‐Aug‐17

5‐Sep‐17

15‐Sep‐17

31‐Oct‐18

4‐May‐17

4‐May‐17

4‐May‐17

2‐Jul‐17

10‐Jul‐17

20‐Sep‐17

22‐Jul‐19

4‐May‐17

4‐May‐17

4‐May‐17

2‐Jul‐17

10‐Jul‐17

20‐Sep‐17

95%

95%

0%

0.079%

0.079%

933

3

ELECTRICAL

3963‐JALM‐2‐36‐0001

OT

20‐Sep‐17

25‐Apr‐17

0.079%

920

B

0.083%

20‐Sep‐17

14‐Apr‐17

3

3963‐FAHS‐2‐34‐0001

OT

A

3

ELECTRICAL

3963‐FAHN‐2‐65‐0002

1

912

3

ELECTRICAL

DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 LIGHTING CALCULATION

913

918

3

OT

0.092%

905

911

3

3‐Aug‐17

19‐Apr‐17

5‐Jul‐17

19‐Jun‐17

3

31‐Oct‐18

4‐Jul‐17

18‐Jun‐17

885

3‐Jul‐17

5‐Jul‐17

19‐Jun‐17

887

2‐May‐17

4‐Jul‐17

18‐Jun‐17

886

27‐Apr‐17

31‐Oct‐18

17‐Jun‐17

13‐Jul‐17

883

18‐Jul‐17

31‐Oct‐18

5‐Jul‐17

884

8‐Jul‐17

20‐Sep‐17

4‐May‐17

0.079%

ELECTRICAL

0.111%

3‐May‐17

0.145%

ELECTRICAL

A

4‐May‐17

Actual WF

ELECTRICAL

1

22‐Jul‐19

0.145%

3

DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 CABLE ROUTING LAYOUT

20‐Sep‐17

Plan WF

3

OT

13‐Jul‐17

5‐Jul‐17

ACTIAWH

3

3963‐KAHS‐2‐64‐0001

5‐Jul‐17

4‐Jul‐17

ACTIFA

876

ELECTRICAL

4‐May‐17

PLIAFC

878

3

3‐May‐17

PLIAWH

877

882

4‐May‐17

5‐Jul‐17

PLIFA

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

0.145%

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 ELECTRICAL TIE‐IN SCHEDULE

1

A

0.083%

8‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

25‐Sep‐17

22‐Jul‐19

16‐May‐17

17‐May‐17

17‐May‐17

8‐Jun‐17

16‐Jun‐17

25‐Sep‐17

95%

95%

0%

0.079%

0.079%

934

3

ELECTRICAL

3963‐JALM‐2‐37‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 ELECTRICAL CABLE SCHEDULE

1

A

0.083%

8‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

22‐May‐17

23‐May‐17

25‐May‐17

19‐Jun‐17

27‐Jun‐17

19‐Sep‐17

22‐Jul‐19

22‐May‐17

23‐May‐17

25‐May‐17

19‐Jun‐17

27‐Jun‐17

19‐Sep‐17

95%

95%

0%

0.079%

0.079%

935

3

ELECTRICAL

3963‐JALM‐2‐54‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 31‐MCC‐0001‐415V MOTOR CONTROL CENTER‐SINGLE LINE DIAGR

1

3

0.083%

25‐May‐17

4‐Jun‐17

9‐Jun‐17

10‐Jul‐17

31‐Jul‐17

10‐Aug‐17

31‐Oct‐18

8‐May‐17

10‐May‐17

11‐May‐17

5‐Jun‐17

13‐Jun‐17

19‐Sep‐17

22‐Jul‐19

8‐May‐17

10‐May‐17

11‐May‐17

5‐Jun‐17

13‐Jun‐17

19‐Sep‐17

95%

95%

0%

0.079%

0.079%

936

3

ELECTRICAL

3963‐JALM‐2‐54‐0002

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 31‐DB‐5206B ‐ LIGHTING DISTRIBUTION BOARD SINGLE LINE DIAGR

1

A

0.083%

25‐May‐17

4‐Jun‐17

9‐Jun‐17

10‐Jul‐17

31‐Jul‐17

10‐Aug‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.079%

0.079%

937

3

ELECTRICAL

3963‐JALM‐2‐54‐0003

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 31‐UPS‐0001 UPS,5KVA SINGLE LINE DIAGRAM‐110V AC INSTRUME

1

A

0.083%

25‐May‐17

4‐Jun‐17

9‐Jun‐17

10‐Jul‐17

31‐Jul‐17

10‐Aug‐17

31‐Oct‐18

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

3‐Aug‐17

23‐Aug‐17

22‐Jul‐19

7‐May‐17

9‐May‐17

10‐May‐17

4‐Jun‐17

3‐Aug‐17

23‐Aug‐17

95%

95%

0%

0.079%

0.079%

2‐Jul‐17

2‐Aug‐17

22‐Jul‐19

23‐Aug‐17

2‐Sep‐17

31‐Oct‐18

2‐Aug‐17

3‐Aug‐17

8‐Nov‐17

2‐Aug‐17

3‐Aug‐17

8‐Nov‐17

95%

95%

0%

0.106%

0.106%

939

3

ELECTRICAL

3963‐JALM‐2‐65‐0002

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 EARTHING LAYOUT

1

A

0.083%

17‐Jun‐17

27‐Jun‐17

2‐Jul‐17

2‐Aug‐17

23‐Aug‐17

2‐Sep‐17

31‐Oct‐18

22‐Jun‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

20‐Sep‐17

20‐Sep‐17

22‐Jul‐19

22‐Jun‐17

3‐Jul‐17

4‐Jul‐17

23‐Jul‐17

20‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.079%

0.079%

940

938

3

3

ELECTRICAL

ELECTRICAL

3963‐JALM‐2‐67‐0001

3963‐JALM‐2‐64‐0001

OT

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 LIGHTING LAYOUT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 CABLE ROUTING LAYOUT

1

1

A

A

0.083%

0.111%

17‐Jun‐17

17‐Jun‐17

27‐Jun‐17

2‐Jul‐17

2‐Aug‐17

23‐Aug‐17

2‐Sep‐17

31‐Oct‐18

21‐May‐17

22‐May‐17

24‐May‐17

13‐Jun‐17

21‐Jun‐17

3‐Aug‐17

22‐Jul‐19

21‐May‐17

22‐May‐17

24‐May‐17

13‐Jun‐17

21‐Jun‐17

3‐Aug‐17

95%

95%

0%

0.079%

0.079%

941

3

ELECTRICAL

3963‐JALM‐2‐31‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING CAB

3

A

0.083%

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

6‐Jul‐17

2‐Aug‐17

3963‐JALM‐2‐31‐0002

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, PO

3

A

0.083%

8‐Jul‐17

18‐Jul‐17

23‐Jul‐17

6‐Aug‐17

11‐Aug‐17

11‐Aug‐17

31‐Oct‐18

8‐Jul‐17

8‐Jul‐17

9‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Feb‐18

22‐Jul‐19

8‐Jul‐17

8‐Jul‐17

9‐Jul‐17

2‐Aug‐17

3‐Aug‐17

26‐Feb‐18

95%

95%

0%

0.079%

0.079%

3963‐JALM‐2‐17‐0001

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 POWER ADEQUACY REPORT

1

A

0.153%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

24‐Sep‐17

22‐Jul‐19

25‐May‐17

12‐Jun‐17

13‐Jun‐17

2‐Aug‐17

3‐Aug‐17

24‐Sep‐17

95%

95%

0%

0.145%

0.145%

17‐May‐17

25‐May‐17

25‐May‐17

5‐Oct‐17

22‐Jul‐19

4‐Jul‐17

5‐Jul‐17

3‐Aug‐17

5‐Oct‐17

0.111%

1‐Apr‐17

11‐Apr‐17

16‐Apr‐17

17‐Jun‐17

31‐Oct‐18

19‐Apr‐17

16‐Apr‐17

19‐Apr‐17

17‐May‐17

1‐Oct‐17

22‐Jul‐19

19‐Apr‐17

16‐Apr‐17

19‐Apr‐17

17‐May‐17

3963‐JALM‐2‐12‐0002

OT

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 LIGHTING CALCULATION

1

A

0.111%

10‐May‐17

20‐May‐17

25‐May‐17

25‐Jun‐17

16‐Jul‐17

26‐Jul‐17

31‐Oct‐18

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

20‐Jul‐17

18‐Sep‐17

19‐Sep‐17

22‐Jul‐19

14‐Apr‐17

14‐Apr‐17

17‐Apr‐17

20‐Jul‐17

18‐Sep‐17

19‐Sep‐17

95%

95%

0%

0.106%

0.106%

OT

DRAWING INDEX – ELECTRICAL

1

A

0.139%

18‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

15‐Sep‐17

25‐Sep‐17

31‐Oct‐18

17‐Jul‐17

18‐Jul‐17

19‐Jul‐17

3‐Aug‐17

15‐Aug‐17

15‐Aug‐17

22‐Jul‐19

17‐Jul‐17

18‐Jul‐17

19‐Jul‐17

3‐Aug‐17

15‐Aug‐17

15‐Aug‐17

95%

95%

0%

0.132%

0.132%

8‐Mar‐18

22‐Jul‐19

OT

MISCELLANEOUS ‐ ELECTRICAL

0

0.069%

31‐Aug‐17

6‐Sep‐17

7‐Sep‐17

14‐Sep‐17

14‐Sep‐17

21‐Sep‐17

31‐Oct‐18

1‐Feb‐18

6‐Feb‐18

1‐Mar‐18

8‐Mar‐18

1‐Feb‐18

6‐Feb‐18

1‐Mar‐18

8‐Mar‐18

948

2

CIVIL

3963‐DGEN‐1‐14‐0001

OT

SPECIFICATION FOR TOPOGRAPHICAL & UG SURVEY WORKS

3

A

0.097%

15‐Mar‐17

25‐Mar‐17

30‐Mar‐17

30‐Apr‐17

21‐May‐17

31‐May‐17

31‐Oct‐18

16‐Mar‐17

21‐Mar‐17

29‐Mar‐17

24‐Apr‐17

4‐May‐17

4‐May‐17

22‐Jul‐19

16‐Mar‐17

21‐Mar‐17

29‐Mar‐17

24‐Apr‐17

4‐May‐17

4‐May‐17

95%

95%

0%

0.092%

0.092%

2

CIVIL

3963‐DGEN‐1‐14‐0002

OT

SPECIFICATIONS FOR STRUCTURAL STEEL WORKS

1

A

0.069%

15‐Mar‐17

25‐Mar‐17

30‐Mar‐17

30‐Apr‐17

21‐May‐17

31‐May‐17

31‐Oct‐18

16‐Mar‐17

27‐Mar‐17

5‐Apr‐17

27‐Apr‐17

27‐Apr‐17

27‐Apr‐17

22‐Jul‐19

16‐Mar‐17

27‐Mar‐17

5‐Apr‐17

27‐Apr‐17

27‐Apr‐17

27‐Apr‐17

95%

95%

0%

0.066%

0.066%

30‐Mar‐17

30‐Apr‐17

21‐May‐17

29‐Mar‐17

0.066%

CIVIL

3963‐DGEN‐1‐14‐0003

OT

SPECIFICATIONS FOR CONCRETE WORKS

1

A

0.069%

15‐Mar‐17

25‐Mar‐17

31‐May‐17

31‐Oct‐18

21‐Mar‐17

29‐Mar‐17

12‐Apr‐17

4‐May‐17

4‐May‐17

4‐May‐17

12‐Apr‐17

4‐May‐17

4‐May‐17

4‐May‐17

95%

95%

0%

0.066%

0.066%

2

CIVIL

3963‐DGEN‐1‐14‐0004

OT

SPECIFICATIONS FOR SITE PREPARATION & EARTHWORKS

1

A

0.069%

22‐Mar‐17

1‐Apr‐17

6‐Apr‐17

7‐May‐17

28‐May‐17

7‐Jun‐17

31‐Oct‐18

14‐Mar‐17

29‐Mar‐17

5‐Apr‐17

13‐May‐17

15‐May‐17

18‐May‐17

22‐Jul‐19

14‐Mar‐17

29‐Mar‐17

5‐Apr‐17

13‐May‐17

15‐May‐17

18‐May‐17

95%

95%

0%

0.066%

0.066%

2

CIVIL

3963‐DGEN‐1‐14‐0005

OT

SPECIFICATIONS FOR ROAD & PAVING WORKS

1

A

0.069%

22‐Mar‐17

1‐Apr‐17

6‐Apr‐17

7‐May‐17

28‐May‐17

7‐Jun‐17

31‐Oct‐18

16‐Mar‐17

29‐Mar‐17

5‐Apr‐17

8‐May‐17

8‐May‐17

8‐May‐17

22‐Jul‐19

16‐Mar‐17

29‐Mar‐17

5‐Apr‐17

8‐May‐17

8‐May‐17

8‐May‐17

95%

95%

0%

0.066%

0.066%

3963‐DGEN‐1‐29‐0001

OT

30‐Apr‐17

31‐May‐17

5‐Apr‐17

CIVIL

15‐Apr‐17

25‐Apr‐17

21‐Jun‐17

21‐Mar‐17

21‐Mar‐17

0.066%

951

2

22‐Jul‐19

0%

952 953

2

95%

0.106%

949 950

95%

0.106%

0.079%

3963‐DGEN‐2‐00‐0001

8‐Mar‐18

0%

0.079%

ELECTRICAL

8‐Mar‐18

95%

0%

ELECTRICAL

8‐Mar‐18

95%

95%

3

3963‐DGEN‐2‐00‐0010

1‐Oct‐17

95%

3

ELECTRICAL

7‐Jun‐17

3‐Aug‐17

945

2

A

2‐Aug‐17

946 947

1

6‐Jul‐17

20‐Jun‐17

ELECTRICAL

DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 LV CABLE SIZING CALCULATION

5‐Jul‐17

19‐Jun‐17

ELECTRICAL

OT

4‐Jul‐17

18‐Jun‐17

3

3963‐JALM‐2‐12‐0001

31‐Oct‐18

20‐Jun‐17

3

ELECTRICAL

23‐Jul‐17

19‐Jun‐17

942

3

18‐Jul‐17

18‐Jun‐17

943 944

8‐Jul‐17

27‐Jun‐17

CIVIL & STRUCTURAL DESIGN CRITERIA

1

A

0.139%

1‐Jul‐17

31‐Oct‐18

4‐May‐17

1‐Jun‐17

1‐Jun‐17

1‐Jun‐17

22‐Jul‐19

21‐Mar‐17

5‐Apr‐17

4‐May‐17

1‐Jun‐17

1‐Jun‐17

1‐Jun‐17

954

2

CIVIL

3963‐DGEN‐1‐87‐0001

OT

GENERAL NOTES ‐ CONCRETE WORKS

1

A

0.083%

15‐Mar‐17

25‐Mar‐17

30‐Mar‐17

30‐Apr‐17

21‐May‐17

31‐May‐17

31‐Oct‐18

21‐Mar‐17

21‐Mar‐17

5‐Apr‐17

3‐May‐17

24‐May‐17

24‐May‐17

22‐Jul‐19

21‐Mar‐17

21‐Mar‐17

5‐Apr‐17

3‐May‐17

24‐May‐17

24‐May‐17

95%

95%

0%

0.079%

0.079%

955

2

CIVIL

3963‐DGEN‐1‐87‐0002

OT

GENERAL NOTES ‐ STRUCTURAL STEEL WORKS

1

A

0.083%

15‐Mar‐17

25‐Mar‐17

30‐Mar‐17

30‐Apr‐17

21‐May‐17

31‐May‐17

31‐Oct‐18

16‐Mar‐17

20‐Mar‐17

5‐Apr‐17

2‐May‐17

2‐May‐17

2‐May‐17

22‐Jul‐19

16‐Mar‐17

20‐Mar‐17

5‐Apr‐17

2‐May‐17

2‐May‐17

2‐May‐17

95%

95%

95%

95%

0%

0%

0.079%

0.132%

0.079%

0.132%

27‐Apr‐17

28‐May‐17

18‐Jun‐17

956

2

CIVIL

3963‐DGEN‐1‐57‐0001

OT

TYPICAL DETAILS OF HANDRAIL 

1

A

0.083%

12‐Apr‐17

22‐Apr‐17

28‐Jun‐17

31‐Oct‐18

16‐Mar‐17

29‐Mar‐17

20‐Apr‐17

8‐May‐17

24‐May‐17

24‐May‐17

22‐Jul‐19

16‐Mar‐17

29‐Mar‐17

20‐Apr‐17

8‐May‐17

24‐May‐17

24‐May‐17

95%

95%

0%

0.079%

0.079%

957

2

CIVIL

3963‐DGEN‐1‐57‐0002

OT

TYPICAL DETAILS OF STAIRS 

1

A

0.083%

5‐Apr‐17

15‐Apr‐17

20‐Apr‐17

21‐May‐17

11‐Jun‐17

21‐Jun‐17

31‐Oct‐18

21‐Mar‐17

23‐Apr‐17

25‐Apr‐17

10‐May‐17

10‐May‐17

10‐May‐17

22‐Jul‐19

21‐Mar‐17

23‐Apr‐17

25‐Apr‐17

10‐May‐17

10‐May‐17

10‐May‐17

95%

95%

0%

0.079%

0.079%

958

2

CIVIL

3963‐DGEN‐1‐57‐0004

OT

TYPICAL DETAILS OF FRONT ACCESS LADDER 

1

A

0.083%

3‐Apr‐17

15‐Apr‐17

20‐Apr‐17

21‐May‐17

11‐Jun‐17

21‐Jun‐17

31‐Oct‐18

2‐May‐17

4‐May‐17

4‐May‐17

22‐May‐17

24‐May‐17

24‐May‐17

22‐Jul‐19

2‐May‐17

4‐May‐17

4‐May‐17

22‐May‐17

24‐May‐17

24‐May‐17

95%

95%

0%

0.079%

959

2

CIVIL

3963‐DGEN‐1‐57‐0006

OT

TYPICAL DETAILS OF SIDE ACCESS LADDER 

1

A

0.083%

12‐Apr‐17

24‐Apr‐17

29‐Apr‐17

30‐May‐17

20‐Jun‐17

30‐Jun‐17

31‐Oct‐18

4‐May‐17

6‐Jun‐17

6‐Jun‐17

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

22‐Jul‐19

4‐May‐17

6‐Jun‐17

6‐Jun‐17

4‐Jul‐17

5‐Jul‐17

6‐Jul‐17

95%

95%

0%

0.079%

0.079%

960

2

CIVIL

3963‐DGEN‐1‐64‐0001

OT

TYPICAL REINFORCED CONCRETE PAVING DETAILS

1

A

0.083%

22‐Mar‐17

1‐Apr‐17

6‐Apr‐17

7‐May‐17

28‐May‐17

7‐Jun‐17

31‐Oct‐18

14‐Mar‐17

2‐Apr‐17

5‐Apr‐17

3‐May‐17

24‐May‐17

24‐May‐17

22‐Jul‐19

14‐Mar‐17

2‐Apr‐17

5‐Apr‐17

3‐May‐17

24‐May‐17

24‐May‐17

95%

95%

0%

0.079%

0.079%

961

2

CIVIL

3963‐DGEN‐1‐57‐0003

OT

TYPICAL DETAILS OF GRATING

1

A

0.083%

5‐Apr‐17

15‐Apr‐17

20‐Apr‐17

21‐May‐17

11‐Jun‐17

21‐Jun‐17

31‐Oct‐18

15‐Mar‐17

23‐Apr‐17

25‐Apr‐17

10‐May‐17

10‐May‐17

10‐May‐17

22‐Jul‐19

15‐Mar‐17

23‐Apr‐17

25‐Apr‐17

10‐May‐17

10‐May‐17

10‐May‐17

95%

95%

0%

0.079%

0.079%

962

TYPICAL DETAILS FOR ROAD SIGNS & BARRIER

1

A

0.083%

7‐May‐17

28‐May‐17

7‐Jun‐17

31‐Oct‐18

2‐Apr‐17

5‐Apr‐17

2‐Apr‐17

5‐Apr‐17

2‐May‐17

95%

95%

0%

0.079%

963

2

CIVIL

3963‐DGEN‐1‐87‐0003

OT

TYPICAL MISC. FOUNDATIONS DETAILS 

1

A

0.222%

20‐Jun‐17

30‐Jun‐17

5‐Jul‐17

5‐Aug‐17

26‐Aug‐17

5‐Sep‐17

31‐Oct‐18

22‐Jun‐17

8‐Nov‐17

15‐Nov‐17

4‐Jan‐18

4‐Jan‐18

4‐Jan‐18

22‐Jul‐19

22‐Jun‐17

8‐Nov‐17

15‐Nov‐17

4‐Jan‐18

4‐Jan‐18

4‐Jan‐18

95%

95%

0%

0.211%

0.211%

964

2

CIVIL

3963‐DGEN‐1‐87‐0004

OT

TYPICAL STRUCTURAL CONNECTION DETAILS 

1

2

0.111%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

18‐May‐17

30‐Sep‐17

2‐Oct‐17

13‐Oct‐17

13‐Oct‐17

13‐Oct‐17

22‐Jul‐19

18‐May‐17

30‐Sep‐17

2‐Oct‐17

13‐Oct‐17

13‐Oct‐17

13‐Oct‐17

95%

95%

0%

0.106%

0.106%

965

2

2

CIVIL

CIVIL

3963‐DGEN‐1‐64‐0002

3963‐DGEN‐1‐87‐0005

OT

OT

TYPICAL PIPE SLEEPER FOUNDATION DETAILS 

0.111%

22‐Mar‐17

15‐May‐17

1‐Apr‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

15‐Mar‐17

2‐May‐17

2‐May‐17

22‐Jul‐19

15‐Mar‐17

2‐May‐17

0.079%

1

A

18‐May‐17

7‐Aug‐17

9‐Aug‐17

20‐Dec‐17

20‐Dec‐17

22‐Jul‐19

18‐May‐17

7‐Aug‐17

9‐Aug‐17

20‐Dec‐17

20‐Dec‐17

95%

95%

0%

0.106%

0.106%

2

CIVIL

3963‐DGEN‐1‐87‐0006

OT

TYPICAL PIPE SUPPORT FOUNDATION DETAILS 

1

A

0.111%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

18‐May‐17

12‐Aug‐17

14‐Aug‐17

3‐Sep‐17

20‐Sep‐17

16‐Nov‐17

22‐Jul‐19

18‐May‐17

12‐Aug‐17

14‐Aug‐17

3‐Sep‐17

20‐Sep‐17

16‐Nov‐17

95%

95%

0%

0.106%

0.106%

2

CIVIL

3963‐DGEN‐1‐58‐0001

OT

TYPICAL PIPE SUPPORT STRUCTURAL DETAILS 

1

B

0.111%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

18‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Dec‐17

20‐Dec‐17

20‐Dec‐17

22‐Jul‐19

18‐May‐17

7‐Aug‐17

9‐Aug‐17

10‐Dec‐17

20‐Dec‐17

20‐Dec‐17

95%

95%

0%

0.106%

0.106%

968

2

CIVIL

3963‐DGEN‐1‐87‐0008

OT

31‐Oct‐18

22‐Mar‐17

4‐May‐17

4‐May‐17

20‐Dec‐17

2‐May‐17

966

22‐Mar‐17

20‐Dec‐17

2‐May‐17

967

12‐Apr‐17

25‐May‐17

6‐Apr‐17

0.079%

TYPICAL ROAD CROSS SECTION DETAILS

1

1

0.083%

22‐Apr‐17

27‐Apr‐17

28‐May‐17

18‐Jun‐17

28‐Jun‐17

4‐May‐17

15‐Oct‐17

15‐Oct‐17

15‐Oct‐17

22‐Jul‐19

4‐May‐17

15‐Oct‐17

15‐Oct‐17

15‐Oct‐17

969

2

CIVIL

3963‐DGEN‐1‐87‐0009

OT

TYPICAL SOAKAWAY PIT DETAILS

1

0

0.000%

12‐Apr‐17

22‐Apr‐17

27‐Apr‐17

28‐May‐17

18‐Jun‐17

28‐Jun‐17

31‐Oct‐18

28‐Jan‐18

30‐Jan‐18

31‐Jan‐18

22‐Mar‐18

28‐Mar‐18

28‐Mar‐18

22‐Jul‐19

28‐Jan‐18

30‐Jan‐18

31‐Jan‐18

22‐Mar‐18

28‐Mar‐18

28‐Mar‐18

95%

95%

0%

0.000%

0.000%

970

2

CIVIL

3963‐KAHN‐1‐64‐0001

OT

KHATIYAH NORTH DEGASSING STATION  SITE GRADING LAYOUT & DETAILS

1

A

0.097%

19‐Apr‐17

29‐Apr‐17

4‐May‐17

4‐Jun‐17

25‐Jun‐17

5‐Jul‐17

31‐Oct‐18

21‐Mar‐17

13‐Jun‐17

14‐Jun‐17

8‐Nov‐17

8‐Nov‐17

7‐Feb‐18

22‐Jul‐19

21‐Mar‐17

13‐Jun‐17

14‐Jun‐17

8‐Nov‐17

8‐Nov‐17

7‐Feb‐18

95%

95%

95%

95%

0%

0%

0.092%

0.079%

0.092%

0.079%

31‐May‐17

1‐Jun‐17

16‐Sep‐17

1‐Jun‐17

16‐Sep‐17

971

2

CIVIL

3963‐KAHN‐1‐50‐0001

OT

KHATIYAH NORTH DEGASSING STATION  GENERAL ARRANGEMENT CIVIL

1

A

0.097%

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

17‐Sep‐17

31‐Oct‐17

31‐Oct‐17

21‐Feb‐18

22‐Jul‐19

17‐Sep‐17

31‐Oct‐17

31‐Oct‐17

21‐Feb‐18

95%

95%

0%

0.092%

0.092%

972

2

CIVIL

3963‐KAHN‐1‐50‐0002

OT

KHATIYAH NORTH DEGASSING STATION  DRAINAGE LAYOUT & DETAILS

1

B

0.097%

19‐Apr‐17

29‐Apr‐17

4‐May‐17

4‐Jun‐17

25‐Jun‐17

5‐Jul‐17

31‐Oct‐18

22‐Mar‐17

13‐Jun‐17

14‐Jun‐17

5‐Nov‐17

5‐Nov‐17

4‐Feb‐18

22‐Jul‐19

22‐Mar‐17

13‐Jun‐17

14‐Jun‐17

5‐Nov‐17

5‐Nov‐17

4‐Feb‐18

95%

95%

0%

0.092%

0.092%

973

2

CIVIL

3963‐KAHN‐1‐66‐0002

OT

KHATIYAH NORTH DEGASSING STATION  METERING SKID FOUNDATION GA & RC DETAILS 

1

A

0.139%

17‐May‐17

27‐May‐17

1‐Jun‐17

2‐Jul‐17

23‐Jul‐17

2‐Aug‐17

31‐Oct‐18

25‐May‐17

13‐Sep‐17

14‐Sep‐17

6‐Dec‐17

4‐Feb‐18

4‐Feb‐18

22‐Jul‐19

25‐May‐17

13‐Sep‐17

14‐Sep‐17

6‐Dec‐17

4‐Feb‐18

4‐Feb‐18

95%

95%

0%

0.132%

974

2

CIVIL

3963‐KAHN‐1‐66‐0003

OT

KHATIYAH NORTH DEGASSING STATION  TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 

1

A

0.139%

17‐May‐17

27‐May‐17

1‐Jun‐17

2‐Jul‐17

23‐Jul‐17

2‐Aug‐17

31‐Oct‐18

25‐May‐17

18‐Sep‐17

19‐Sep‐17

25‐Oct‐17

25‐Oct‐17

13‐Feb‐18

22‐Jul‐19

25‐May‐17

18‐Sep‐17

19‐Sep‐17

25‐Oct‐17

25‐Oct‐17

13‐Feb‐18

95%

95%

0%

0.132%

0.132%

975

2

CIVIL

3963‐KAHN‐1‐51‐0001

OT

KHATIYAH NORTH DEGASSING STATION  TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 

1

A

0.278%

17‐May‐17

27‐May‐17

1‐Jun‐17

2‐Jul‐17

23‐Jul‐17

2‐Aug‐17

31‐Oct‐18

25‐May‐17

13‐Sep‐17

14‐Sep‐17

13‐Dec‐17

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

25‐May‐17

13‐Sep‐17

14‐Sep‐17

13‐Dec‐17

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.264%

0.264%

976

2

CIVIL

3963‐KAHN‐1‐51‐0002

OT

KHATIYAH NORTH DEGASSING STATION  METERING SKID PLATFORM STRUCTURAL GA & DETAILS 

1

A

0.139%

17‐May‐17

27‐May‐17

1‐Jun‐17

2‐Jul‐17

23‐Jul‐17

2‐Aug‐17

31‐Oct‐18

25‐May‐17

23‐Sep‐17

25‐Sep‐17

26‐Oct‐17

26‐Oct‐17

30‐Jan‐18

22‐Jul‐19

25‐May‐17

23‐Sep‐17

25‐Sep‐17

26‐Oct‐17

26‐Oct‐17

30‐Jan‐18

95%

95%

0%

0.132%

0.132%

977

2

CIVIL

17‐May‐17

KHATIYAH NORTH DEGASSING STATION FOUNDATION LOCATION PLAN

1

A

0.278%

27‐May‐17

1‐Jun‐17

2‐Jul‐17

31‐Oct‐18

25‐May‐17

3‐Oct‐17

14‐Nov‐17

7‐Mar‐18

22‐Jul‐19

25‐May‐17

3‐Oct‐17

14‐Nov‐17

7‐Mar‐18

978

2

CIVIL

3963‐KAHM‐1‐64‐0001

OT

KHATIYAH MAIN DEGASSING STATION  PAVING LAYOUT & DETAILS

1

A

0.069%

28‐Apr‐17

8‐May‐17

13‐May‐17

13‐Jun‐17

4‐Jul‐17

14‐Jul‐17

31‐Oct‐18

5‐Apr‐17

26‐Jun‐17

28‐Jun‐17

14‐Nov‐17

12‐Feb‐18

12‐Feb‐18

22‐Jul‐19

5‐Apr‐17

26‐Jun‐17

28‐Jun‐17

14‐Nov‐17

12‐Feb‐18

12‐Feb‐18

95%

95%

0%

0.066%

0.066%

979

2

CIVIL

3963‐KAHM‐1‐50‐0001

OT

KHATIYAH MAIN DEGASSING STATION  GENERAL ARRANGEMENT CIVIL

1

A

0.069%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

24‐Sep‐17

26‐Sep‐17

5‐Nov‐17

5‐Nov‐17

22‐Feb‐18

22‐Jul‐19

1‐Jun‐17

24‐Sep‐17

26‐Sep‐17

5‐Nov‐17

5‐Nov‐17

22‐Feb‐18

95%

95%

0%

0.066%

0.066%

8‐May‐17

13‐May‐17

980

OT

KHATIYAH MAIN DEGASSING STATION  DRAINAGE LAYOUT & DETAILS

1

28‐Apr‐17

14‐Jul‐17

25‐Jun‐17

12‐Feb‐18

7‐Mar‐18

95%

0%

0.264%

0.066%

0.264%

13‐Jun‐17

4‐Jul‐17

31‐Oct‐18

5‐Apr‐17

27‐Jun‐17

15‐Nov‐17

22‐Jul‐19

5‐Apr‐17

27‐Jun‐17

15‐Nov‐17

OT

KHATIYAH MAIN DEGASSING STATION  METERING SKID FOUNDATION GA & RC DETAILS

1

A

0.139%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

18‐Sep‐17

20‐Sep‐17

2‐Nov‐17

2‐Nov‐17

7‐Feb‐18

22‐Jul‐19

25‐May‐17

18‐Sep‐17

20‐Sep‐17

2‐Nov‐17

2‐Nov‐17

7‐Feb‐18

95%

95%

0%

0.132%

0.132%

KHATIYAH MAIN DEGASSING STATION  TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 

1

A

0.139%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

26‐Sep‐17

28‐Sep‐17

5‐Dec‐17

13‐Feb‐18

13‐Feb‐18

22‐Jul‐19

1‐Jun‐17

26‐Sep‐17

28‐Sep‐17

5‐Dec‐17

13‐Feb‐18

13‐Feb‐18

95%

95%

0%

0.132%

0.132%

2‐Oct‐17

15‐Nov‐17

2‐Oct‐17

15‐Nov‐17

8‐Feb‐18

95%

0%

OT

8‐Feb‐18

12‐Feb‐18

95%

3963‐KAHM‐1‐66‐0002

22‐Jul‐19

12‐Feb‐18

95%

3963‐KAHM‐1‐66‐0003

8‐Feb‐18

25‐Jun‐17

7‐Mar‐18

CIVIL

8‐Feb‐18

12‐Feb‐18

1‐Oct‐17

CIVIL

A

0.069%

1‐Oct‐17

2

1

B

2‐Aug‐17

2

CIVIL

3963‐KAHM‐1‐50‐0002

23‐Jul‐17

981

2

CIVIL

OT

982 983

2

3963‐KAHN‐1‐50‐0003

0.132%

0.066%

3963‐KAHM‐1‐51‐0001

OT

KHATIYAH MAIN DEGASSING STATION  TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 

0.278%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

30‐Sep‐17

1‐Jun‐17

30‐Sep‐17

95%

95%

0%

0.264%

0.264%

984

2

CIVIL

3963‐KAHM‐1‐51‐0002

OT

KHATIYAH MAIN DEGASSING STATION  METERING SKID PLATFORM STRUCTURAL GA & DETAILS 

1

A

0.139%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

29‐Sep‐17

1‐Oct‐17

2‐Nov‐17

2‐Nov‐17

4‐Feb‐18

22‐Jul‐19

1‐Jun‐17

29‐Sep‐17

1‐Oct‐17

2‐Nov‐17

2‐Nov‐17

4‐Feb‐18

95%

95%

0%

0.132%

0.132%

985

2

CIVIL

3963‐KAHM‐1‐50‐0003

OT

KHATIYAH MAIN DEGASSING STATION FOUNDATION LOCATION PLAN

1

A

0.278%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

3‐Oct‐17

5‐Oct‐17

15‐Apr‐18

15‐Apr‐18

15‐Apr‐18

22‐Jul‐19

25‐May‐17

3‐Oct‐17

5‐Oct‐17

15‐Apr‐18

15‐Apr‐18

15‐Apr‐18

95%

95%

0%

0.264%

0.264%

986

2

CIVIL

3963‐KAHS‐1‐64‐0001

OT

KHATIYAH SOUTH DEGASSING STATION  PAVING LAYOUT & DETAILS

1

A

0.069%

5‐May‐17

15‐May‐17

20‐May‐17

20‐Jun‐17

11‐Jul‐17

21‐Jul‐17

31‐Oct‐18

22‐Mar‐17

18‐Nov‐17

20‐Nov‐17

18‐Jan‐18

20‐Jan‐18

20‐Jan‐18

22‐Jul‐19

22‐Mar‐17

18‐Nov‐17

20‐Nov‐17

18‐Jan‐18

20‐Jan‐18

20‐Jan‐18

95%

95%

0%

0.066%

0.066%

987

2

CIVIL

3963‐KAHS‐1‐50‐0001

OT

KHATIYAH SOUTH DEGASSING STATION  GENERAL ARRANGEMENT CIVIL

1

A

0.069%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

13‐Jul‐17

24‐Sep‐17

26‐Sep‐17

5‐Nov‐17

5‐Nov‐17

25‐Feb‐18

22‐Jul‐19

13‐Jul‐17

24‐Sep‐17

26‐Sep‐17

5‐Nov‐17

5‐Nov‐17

25‐Feb‐18

95%

95%

0%

0.066%

0.066%

988

2

CIVIL

3963‐KAHS‐1‐50‐0002

OT

KHATIYAH SOUTH DEGASSING STATION  DRAINAGE LAYOUT & DETAILS

1

B

0.139%

5‐May‐17

15‐May‐17

20‐May‐17

20‐Jun‐17

11‐Jul‐17

21‐Jul‐17

31‐Oct‐18

22‐Mar‐17

25‐Sep‐17

27‐Sep‐17

16‐Nov‐17

4‐Feb‐18

22‐Jul‐19

22‐Mar‐17

25‐Sep‐17

27‐Sep‐17

16‐Nov‐17

4‐Feb‐18

95%

95%

0%

0.132%

0.132%

989

2

CIVIL

3963‐KAHS‐1‐66‐0002

OT

KHATIYAH SOUTH DEGASSING STATION  METERING SKID FOUNDATION GA & RC DETAILS 

1

A

0.139%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

13‐Jul‐17

24‐Sep‐17

26‐Sep‐17

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

13‐Jul‐17

24‐Sep‐17

26‐Sep‐17

5‐Feb‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.132%

0.132%

990

2

CIVIL

3963‐KAHS‐1‐66‐0003

OT

KHATIYAH SOUTH DEGASSING STATION  TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 

1

B

0.069%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

13‐Jul‐17

29‐Sep‐17

1‐Oct‐17

6‐Dec‐17

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

13‐Jul‐17

29‐Sep‐17

1‐Oct‐17

6‐Dec‐17

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.066%

0.066%

991

2

CIVIL

3963‐KAHS‐1‐51‐0001

OT

KHATIYAH SOUTH DEGASSING STATION  TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 

1

B

0.278%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

8‐Jul‐17

1‐Oct‐17

3‐Oct‐17

16‐Nov‐17

12‐Feb‐18

12‐Feb‐18

22‐Jul‐19

8‐Jul‐17

1‐Oct‐17

3‐Oct‐17

16‐Nov‐17

12‐Feb‐18

12‐Feb‐18

95%

95%

0%

0.264%

0.264%

Page 8 of 13

4‐Feb‐18

4‐Feb‐18

Page 79 of 170

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC NO

ITEM CODE

DOC DESC

DOC CLASS

CURRENT REVISION

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100%

ACTIAFC

ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

SRN

SEQ

WV

PLS

PLD

PLIFC

PLIFA

PLASBUILT

PLS

PLIAFC

PLASBUILT

ACTS

992

2

CIVIL

3963‐KAHS‐1‐51‐0002

0.139%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

8‐Jul‐17

3‐Oct‐17

5‐Oct‐17

6‐Dec‐17

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

8‐Jul‐17

3‐Oct‐17

5‐Oct‐17

6‐Dec‐17

5‐Feb‐18

5‐Feb‐18

993

2

CIVIL

3963‐KAHS‐1‐50‐0003

OT

KHATIYAH SOUTH DEGASSING STATION FOUNDATION LOCATION PLAN

1

A

0.278%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

8‐Jul‐17

11‐Oct‐17

12‐Oct‐17

11‐Jan‐18

12‐Mar‐18

12‐Mar‐18

22‐Jul‐19

8‐Jul‐17

11‐Oct‐17

12‐Oct‐17

11‐Jan‐18

12‐Mar‐18

12‐Mar‐18

95%

95%

0%

0.264%

0.264%

994

2

CIVIL

3963‐FAHN‐1‐64‐0001

OT

FAHAHIL NORTH DEGASSING STATION  PAVING LAYOUT & DETAILS

1

A

0.069%

12‐May‐17

22‐May‐17

27‐May‐17

27‐Jun‐17

18‐Jul‐17

28‐Jul‐17

31‐Oct‐18

25‐May‐17

18‐Sep‐17

19‐Sep‐17

7‐Nov‐17

7‐Nov‐17

18‐Feb‐18

22‐Jul‐19

25‐May‐17

18‐Sep‐17

19‐Sep‐17

7‐Nov‐17

7‐Nov‐17

18‐Feb‐18

95%

95%

0%

0.066%

0.066%

995

2

CIVIL

3963‐FAHN‐1‐50‐0001

OT

FAHAHIL NORTH DEGASSING STATION  GENERAL ARRANGEMENT CIVIL

1

A

0.069%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

22‐Jun‐17

10‐Oct‐17

12‐Oct‐17

6‐Nov‐17

6‐Nov‐17

20‐Nov‐17

22‐Jul‐19

22‐Jun‐17

10‐Oct‐17

12‐Oct‐17

6‐Nov‐17

6‐Nov‐17

20‐Nov‐17

95%

95%

0%

0.066%

0.066%

13‐Nov‐17

13‐Nov‐17

996

DOC NO

OT

CURRENT REVISION A

Original BL WV

ITEM DOC DESC CODE OT KHATIYAH SOUTH DEGASSING STATION  METERING SKID PLATFORM STRUCTURAL GA & DETAILS 

DISCIPLINE

DOC CLASS 1

SHUTD OWN PACKA GE SHUTD OWN

PLIAWH

PLIAFC

PLD

PLIFC

PLIFA

PLIAWH

5‐Mar‐18

ACTD

ACTIFC

ACTIFA

ACTIAWH

5‐Mar‐18

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

Plan WF 0.132%

Actual WF 0.132%

2

CIVIL

3963‐FAHN‐1‐50‐0002

FAHAHIL NORTH DEGASSING STATION  DRAINAGE LAYOUT & DETAILS

1

A

0.069%

12‐May‐17

22‐May‐17

27‐May‐17

27‐Jun‐17

18‐Jul‐17

28‐Jul‐17

31‐Oct‐18

25‐May‐17

18‐Sep‐17

19‐Sep‐17

5‐Mar‐18

22‐Jul‐19

25‐May‐17

18‐Sep‐17

19‐Sep‐17

5‐Mar‐18

95%

95%

0%

0.066%

0.066%

997

2

CIVIL

3963‐FAHN‐1‐66‐0001

OT

FAHAHIL NORTH DEGASSING STATION  TEST SEPARATOR FOUNDATION GA & RC DETAILS 

1

A

0.139%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

22‐Jun‐17

28‐Aug‐17

29‐Aug‐17

1‐Nov‐17

1‐Nov‐17

29‐Jan‐18

22‐Jul‐19

22‐Jun‐17

28‐Aug‐17

29‐Aug‐17

1‐Nov‐17

1‐Nov‐17

29‐Jan‐18

95%

95%

0%

0.132%

0.132%

998

2

CIVIL

3963‐FAHN‐1‐66‐0002

OT

FAHAHIL NORTH DEGASSING STATION  METERING SKID FOUNDATION GA & RC DETAILS 

1

A

0.139%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

22‐Jun‐17

3‐Oct‐17

5‐Oct‐17

11‐Dec‐17

15‐Feb‐18

15‐Feb‐18

22‐Jul‐19

22‐Jun‐17

3‐Oct‐17

5‐Oct‐17

11‐Dec‐17

15‐Feb‐18

15‐Feb‐18

95%

95%

0%

0.132%

0.132%

999

2

CIVIL

3963‐FAHN‐1‐66‐0003

OT

FAHAHIL NORTH DEGASSING STATION  TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 

1

A

0.111%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

22‐Jun‐17

21‐Aug‐17

24‐Aug‐17

7‐Nov‐17

7‐Nov‐17

1‐Mar‐18

22‐Jul‐19

22‐Jun‐17

21‐Aug‐17

24‐Aug‐17

7‐Nov‐17

7‐Nov‐17

1‐Mar‐18

95%

95%

0%

0.106%

1000

2

CIVIL

3963‐FAHN‐1‐51‐0001

OT

FAHAHIL NORTH DEGASSING STATION  TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS 

1

A

0.111%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

21‐Jun‐17

12‐Aug‐17

14‐Aug‐17

6‐Sep‐17

20‐Sep‐17

1‐Mar‐18

22‐Jul‐19

21‐Jun‐17

12‐Aug‐17

14‐Aug‐17

6‐Sep‐17

20‐Sep‐17

1‐Mar‐18

95%

95%

0%

0.106%

0.106%

1001

2

CIVIL

3963‐FAHN‐1‐51‐0002

OT

FAHAHIL NORTH DEGASSING STATION  METERING SKID PLATFORM STRUCTURAL GA & DETAILS 

1

A

0.333%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

21‐Jun‐17

18‐Oct‐17

19‐Oct‐17

27‐Feb‐18

19‐Mar‐18

19‐Mar‐18

22‐Jul‐19

21‐Jun‐17

18‐Oct‐17

19‐Oct‐17

27‐Feb‐18

19‐Mar‐18

19‐Mar‐18

95%

95%

0%

0.317%

0.317%

1002

2

CIVIL

3963‐FAHN‐1‐50‐0003

OT

FAHAHIL NORTH DEGASSING STATION FOUNDATION LOCATION PLAN

1

A

0.278%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

21‐Jun‐17

28‐Oct‐17

29‐Oct‐17

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

22‐Jul‐19

21‐Jun‐17

28‐Oct‐17

29‐Oct‐17

18‐Mar‐18

18‐Mar‐18

18‐Mar‐18

95%

95%

0%

0.264%

0.264%

1003

2

CIVIL

3963‐FAHM‐1‐64‐0001

OT

FAHAHIL MAIN DEGASSING STATION  PAVING LAYOUT & DETAILS

1

A

0.069%

17‐May‐17

27‐May‐17

1‐Jun‐17

2‐Jul‐17

23‐Jul‐17

2‐Aug‐17

31‐Oct‐18

25‐May‐17

3‐Jul‐17

4‐Jul‐17

6‐Nov‐17

6‐Nov‐17

21‐Feb‐18

22‐Jul‐19

25‐May‐17

3‐Jul‐17

4‐Jul‐17

6‐Nov‐17

6‐Nov‐17

21‐Feb‐18

95%

95%

0%

0.066%

0.066%

1004

2

CIVIL

3963‐FAHM‐1‐50‐0001

OT

FAHAHIL MAIN DEGASSING STATION  GENERAL ARRANGEMENT CIVIL

1

A

0.069%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

5‐Jul‐17

10‐Oct‐17

14‐Dec‐17

8‐Apr‐18

25‐Apr‐18

25‐Apr‐18

22‐Jul‐19

5‐Jul‐17

10‐Oct‐17

14‐Dec‐17

8‐Apr‐18

25‐Apr‐18

25‐Apr‐18

95%

95%

0%

0.066%

0.066%

1005

2

CIVIL

3963‐FAHM‐1‐50‐0002

OT

FAHAHIL MAIN DEGASSING STATION  DRAINAGE LAYOUT & DETAILS

1

A

0.069%

17‐May‐17

27‐May‐17

1‐Jun‐17

2‐Jul‐17

23‐Jul‐17

2‐Aug‐17

31‐Oct‐18

25‐May‐17

3‐Jul‐17

4‐Jul‐17

5‐Mar‐18

5‐Mar‐18

5‐Mar‐18

22‐Jul‐19

25‐May‐17

3‐Jul‐17

4‐Jul‐17

5‐Mar‐18

5‐Mar‐18

5‐Mar‐18

95%

95%

0%

0.066%

1006

2

CIVIL

3963‐FAHM‐1‐66‐0001

OT

FAHAHIL MAIN DEGASSING STATION  TEST SEPARATOR FOUNDATION GA & RC DETAILS 

1

A

0.139%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

3‐Jul‐17

25‐Sep‐17

27‐Sep‐17

1‐Nov‐17

1‐Nov‐17

29‐Jan‐18

22‐Jul‐19

3‐Jul‐17

25‐Sep‐17

27‐Sep‐17

1‐Nov‐17

1‐Nov‐17

29‐Jan‐18

95%

95%

0%

0.132%

0.132%

1007

2

CIVIL

3963‐FAHM‐1‐66‐0002

OT

FAHAHIL MAIN DEGASSING STATION  METERING SKID FOUNDATION GA & RC DETAILS 

1

A

0.139%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

3‐Jul‐17

10‐Oct‐17

12‐Oct‐17

2‐Nov‐17

2‐Nov‐17

15‐Feb‐18

22‐Jul‐19

3‐Jul‐17

10‐Oct‐17

12‐Oct‐17

2‐Nov‐17

2‐Nov‐17

15‐Feb‐18

95%

95%

0%

0.132%

0.132%

1008

2

CIVIL

3963‐FAHM‐1‐66‐0003

OT

FAHAHIL MAIN DEGASSING STATION  TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 

1

A

0.139%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

3‐Jul‐17

15‐Oct‐17

16‐Oct‐17

7‐Dec‐17

5‐Apr‐18

5‐Apr‐18

22‐Jul‐19

3‐Jul‐17

15‐Oct‐17

16‐Oct‐17

7‐Dec‐17

5‐Apr‐18

5‐Apr‐18

95%

95%

0%

0.132%

0.132%

1009

2

CIVIL

1

A

0.139%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

10‐Sep‐17

20‐Sep‐17

7‐Dec‐17

29‐Apr‐18

29‐Apr‐18

7‐Dec‐17

29‐Apr‐18

29‐Apr‐18

95%

95%

0%

0.132%

0.132%

1010

2

CIVIL

3963‐FAHM‐1‐51‐0002

OT

FAHAHIL MAIN DEGASSING STATION  METERING SKID PLATFORM STRUCTURAL GA & DETAILS 

1

A

0.278%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

4‐Jul‐17

10‐Oct‐17

12‐Oct‐17

2‐Nov‐17

2‐Nov‐17

26‐Feb‐18

22‐Jul‐19

4‐Jul‐17

10‐Oct‐17

12‐Oct‐17

2‐Nov‐17

2‐Nov‐17

26‐Feb‐18

95%

95%

0%

0.264%

1011

2

CIVIL

3963‐FAHM‐1‐50‐0003

OT

FAHAHIL MAIN DEGASSING STATION FOUNDATION LOCATION PLAN

1

0

0.278%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

4‐Jul‐17

22‐Oct‐17

24‐Oct‐17

25‐Mar‐18

2‐Apr‐18

2‐Apr‐18

22‐Jul‐19

4‐Jul‐17

22‐Oct‐17

24‐Oct‐17

25‐Mar‐18

2‐Apr‐18

2‐Apr‐18

95%

95%

0%

0.264%

0.264%

1012

2

CIVIL

3963‐FAHS‐1‐64‐0001

OT

FAHAHIL SOUTH DEGASSING STATION  SITE GRADING LAYOUT & DETAILS

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

10‐Oct‐17

12‐Oct‐17

13‐Nov‐17

5‐Apr‐18

5‐Apr‐18

22‐Jul‐19

25‐May‐17

10‐Oct‐17

12‐Oct‐17

13‐Nov‐17

5‐Apr‐18

5‐Apr‐18

95%

95%

0%

0.066%

0.066%

1013

2

CIVIL

3963‐FAHS‐1‐50‐0001

OT

FAHAHIL SOUTH DEGASSING STATION  GENERAL ARRANGEMENT CIVIL

1

1

0.069%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

11‐Jul‐17

6‐Oct‐17

20‐Nov‐17

3‐Apr‐18

3‐Apr‐18

3‐Apr‐18

22‐Jul‐19

11‐Jul‐17

6‐Oct‐17

20‐Nov‐17

3‐Apr‐18

3‐Apr‐18

3‐Apr‐18

95%

95%

0%

0.066%

0.066%

1014

2

CIVIL

3963‐FAHS‐1‐50‐0002

OT

FAHAHIL SOUTH DEGASSING STATION  DRAINAGE LAYOUT & DETAILS

1

1

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

5‐Oct‐17

11‐Apr‐18

11‐Apr‐18

22‐Jul‐19

25‐May‐17

5‐Oct‐17

11‐Apr‐18

11‐Apr‐18

1015

2

CIVIL

3963‐FAHS‐1‐66‐0001

OT

FAHAHIL SOUTH DEGASSING STATION  TEST SEPARATOR FOUNDATION GA & RC DETAILS 

1

A

0.139%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

10‐Oct‐17

12‐Oct‐17

1‐Nov‐17

1‐Nov‐17

29‐Jan‐18

22‐Jul‐19

8‐Jul‐17

10‐Oct‐17

12‐Oct‐17

1‐Nov‐17

1‐Nov‐17

29‐Jan‐18

95%

95%

0%

0.132%

0.132%

1016

2

CIVIL

3963‐FAHS‐1‐66‐0002

OT

FAHAHIL SOUTH DEGASSING STATION  METERING SKID FOUNDATION GA & RC DETAILS

1

A

0.139%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

10‐Oct‐17

12‐Oct‐17

2‐Nov‐17

2‐Nov‐17

15‐Feb‐18

22‐Jul‐19

8‐Jul‐17

10‐Oct‐17

12‐Oct‐17

2‐Nov‐17

2‐Nov‐17

15‐Feb‐18

95%

95%

0%

0.132%

0.132%

1017

2

CIVIL

3963‐FAHS‐1‐66‐0003

OT

FAHAHIL SOUTH DEGASSING STATION  TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS

1

A

0.139%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

23‐Oct‐17

25‐Oct‐17

19‐Nov‐17

14‐Mar‐18

14‐Mar‐18

22‐Jul‐19

8‐Jul‐17

23‐Oct‐17

25‐Oct‐17

19‐Nov‐17

14‐Mar‐18

14‐Mar‐18

95%

95%

0%

0.132%

3963‐FAHM‐1‐51‐0001

OT

FAHAHIL MAIN DEGASSING STATION  TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS

20‐Aug‐17

9‐Jul‐17

30‐Jul‐17

31‐Oct‐18

4‐Jul‐17

2‐Aug‐17

3‐Oct‐17

3‐Aug‐17

11‐Apr‐18

22‐Jul‐19

4‐Jul‐17

2‐Aug‐17

3‐Oct‐17

3‐Aug‐17

11‐Apr‐18

95%

95%

0%

0.066%

0.106%

0.066%

0.264%

0.066%

0.132%

1018

2

CIVIL

3963‐FAHS‐1‐51‐0001

OT

FAHAHIL SOUTH DEGASSING STATION  TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS

1

A

0.278%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

11‐Jul‐17

25‐Oct‐17

26‐Oct‐17

6‐Dec‐17

13‐Mar‐18

13‐Mar‐18

22‐Jul‐19

11‐Jul‐17

25‐Oct‐17

26‐Oct‐17

6‐Dec‐17

13‐Mar‐18

13‐Mar‐18

95%

95%

0%

0.264%

0.264%

1019

2

CIVIL

3963‐FAHS‐1‐51‐0002

OT

FAHAHIL SOUTH DEGASSING STATION  METERING SKID PLATFORM STRUCTURAL GA & DETAILS 

1

A

0.139%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

10‐Oct‐17

12‐Oct‐17

2‐Nov‐17

2‐Nov‐17

1‐Mar‐18

22‐Jul‐19

8‐Jul‐17

10‐Oct‐17

12‐Oct‐17

2‐Nov‐17

2‐Nov‐17

1‐Mar‐18

95%

95%

0%

0.132%

0.132%

1020

2

CIVIL

3963‐FAHS‐1‐50‐0003

OT

FAHAHIL SOUTH DEGASSING STATION FOUNDATION LOCATION PLAN

1

A

0.278%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

20‐Oct‐17

22‐Oct‐17

23‐Apr‐18

22‐Jul‐19

8‐Jul‐17

20‐Oct‐17

22‐Oct‐17

23‐Apr‐18

95%

95%

0%

0.264%

0.264%

1021

2

CIVIL

3963‐JALM‐1‐64‐0002

OT

JALEHA MAIN DEGASSING STATION  ROAD & PAVING LAYOUT & DETAILS

1

0

0.167%

7‐Jun‐17

17‐Jun‐17

22‐Jun‐17

23‐Jul‐17

13‐Aug‐17

23‐Aug‐17

31‐Oct‐18

7‐Jun‐17

1‐Oct‐17

3‐Oct‐17

4‐May‐18

24‐Sep‐18

24‐Sep‐18

22‐Jul‐19

7‐Jun‐17

1‐Oct‐17

3‐Oct‐17

4‐May‐18

24‐Sep‐18

24‐Sep‐18

95%

95%

0%

0.159%

1022

2

CIVIL

3963‐JALM‐1‐50‐0001

OT

JALEHA MAIN DEGASSING STATION GENERAL ARRANGEMENT CIVIL

1

1

0.097%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

3‐Oct‐17

5‐Oct‐17

24‐Dec‐17

27‐May‐18

27‐May‐18

22‐Jul‐19

8‐Jul‐17

3‐Oct‐17

5‐Oct‐17

24‐Dec‐17

27‐May‐18

27‐May‐18

95%

95%

0%

0.092%

0.092%

1023

2

CIVIL

3963‐JALM‐1‐66‐0001

OT

JALEHA MAIN DEGASSING STATION  TEST SEPARATOR FOUNDATION GA & RC DETAILS 

1

A

0.139%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

17‐Oct‐17

18‐Oct‐17

27‐Dec‐17

11‐Mar‐18

11‐Mar‐18

22‐Jul‐19

13‐Jul‐17

17‐Oct‐17

18‐Oct‐17

27‐Dec‐17

11‐Mar‐18

11‐Mar‐18

95%

95%

0%

0.132%

0.132%

1024

2

CIVIL

3963‐JALM‐1‐66‐0003

OT

JALEHA MAIN DEGASSING STATION  TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS 

1

0

0.139%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

17‐Oct‐17

19‐Oct‐17

11‐Apr‐18

11‐Apr‐18

11‐Apr‐18

22‐Jul‐19

13‐Jul‐17

17‐Oct‐17

19‐Oct‐17

11‐Apr‐18

11‐Apr‐18

11‐Apr‐18

95%

95%

0%

0.132%

0.132%

1025

2

CIVIL

3963‐JALM‐1‐51‐0001

OT

JALEHA MAIN DEGASSING STATION  TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS

1

1

0.10%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

11‐Jul‐17

8‐Nov‐17

15‐Nov‐17

29‐Nov‐17

1‐May‐18

1‐May‐18

22‐Jul‐19

11‐Jul‐17

8‐Nov‐17

15‐Nov‐17

29‐Nov‐17

1‐May‐18

1‐May‐18

95%

95%

0%

0.092%

0.092%

1026

2

CIVIL

3963‐JALM‐1‐51‐0002

OT

JALEHA MAIN DEGASSING STATION  METERING SKID PLATFORM STRUCTURAL GA & DETAILS

1

0

0.139%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

18‐Oct‐17

19‐Oct‐17

20‐Mar‐18

29‐Apr‐18

29‐Apr‐18

22‐Jul‐19

8‐Jul‐17

18‐Oct‐17

19‐Oct‐17

20‐Mar‐18

29‐Apr‐18

29‐Apr‐18

95%

95%

0%

0.132%

1027

2

CIVIL

3963‐JALM‐1‐50‐0003

OT

JALEHA MAIN DEGASSING STATION FOUNDATION LOCATION PLAN

1

0

0.097%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

8‐Jul‐17

6‐Nov‐17

8‐Nov‐17

27‐May‐18

28‐Jun‐18

28‐Jun‐18

22‐Jul‐19

8‐Jul‐17

6‐Nov‐17

8‐Nov‐17

27‐May‐18

28‐Jun‐18

28‐Jun‐18

95%

95%

0%

0.092%

0.092%

1028

2

CIVIL

DEM‐3963‐KAHN‐1‐50‐0001

DEM

KHATIYAH NORTH DEGASSING STATION EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING

3

A

0.083%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

19‐Jul‐17

20‐Jul‐17

13‐Aug‐17

22‐Aug‐17

23‐Aug‐17

22‐Jul‐19

1‐Jun‐17

19‐Jul‐17

20‐Jul‐17

13‐Aug‐17

22‐Aug‐17

23‐Aug‐17

95%

95%

0%

0.079%

0.079%

1029

2

CIVIL

DEM‐3963‐KAHN‐1‐50‐0002

DEM

KHATIYAH NORTH DEGASSING STATION EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAW

3

A

0.097%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

19‐Jul‐17

20‐Jul‐17

13‐Aug‐17

22‐Aug‐17

23‐Aug‐17

22‐Jul‐19

31‐May‐17

19‐Jul‐17

20‐Jul‐17

13‐Aug‐17

22‐Aug‐17

23‐Aug‐17

95%

95%

0%

0.092%

1‐Apr‐18

23‐Apr‐18

1‐Apr‐18

23‐Apr‐18

0.159%

0.132%

0.092%

1030

2

CIVIL

DEM‐3963‐KAHM‐1‐50‐0001

DEM

KHATIYAH MAIN DEGASSING STATION  EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING

3

A

0.083%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

19‐Jul‐17

20‐Jul‐17

10‐Aug‐17

22‐Aug‐17

23‐Aug‐17

22‐Jul‐19

31‐May‐17

19‐Jul‐17

20‐Jul‐17

10‐Aug‐17

22‐Aug‐17

23‐Aug‐17

95%

95%

0%

0.079%

0.079%

1031

2

CIVIL

DEM‐3963‐KAHM‐1‐50‐0002

DEM

KHATIYAH MAIN DEGASSING STATION  EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAW

3

A

0.083%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

19‐Jul‐17

20‐Jul‐17

10‐Aug‐17

22‐Aug‐17

23‐Aug‐17

22‐Jul‐19

31‐May‐17

19‐Jul‐17

20‐Jul‐17

10‐Aug‐17

22‐Aug‐17

23‐Aug‐17

95%

95%

0%

0.079%

0.079%

KHATIYAH SOUTH DEGASSING STATION  EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING

3

0.083%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

19‐Jul‐17

20‐Jul‐17

19‐Jul‐17

20‐Jul‐17

95%

95%

0%

0.079%

0.079%

1032

2

CIVIL

31‐Oct‐18

31‐May‐17

17‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

31‐May‐17

17‐Aug‐17

27‐Aug‐17

29‐Aug‐17

1033

2

CIVIL

DEM‐3963‐KAHS‐1‐50‐0002

DEM

KHATIYAH SOUTH DEGASSING STATION  EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAW

3

A

0.083%

31‐May‐17

10‐Jun‐17

15‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

31‐May‐17

19‐Jul‐17

20‐Jul‐17

17‐Aug‐17

27‐Aug‐17

29‐Aug‐17

22‐Jul‐19

31‐May‐17

19‐Jul‐17

20‐Jul‐17

17‐Aug‐17

27‐Aug‐17

29‐Aug‐17

95%

95%

0%

0.079%

1034

2

CIVIL

DEM‐3963‐FAHN‐1‐50‐0001

DEM

FAHAHIL NORTH DEGASSING STATION  EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING

3

A

0.097%

31‐May‐17

10‐Jun‐17

22‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

24‐Aug‐17

13‐Sep‐17

14‐Sep‐17

22‐Jul‐19

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

24‐Aug‐17

13‐Sep‐17

14‐Sep‐17

95%

95%

0%

0.092%

0.092%

1035

2

CIVIL

DEM‐3963‐FAHN‐1‐50‐0002

DEM

FAHAHIL NORTH DEGASSING STATION  EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAW

3

A

0.097%

31‐May‐17

10‐Jun‐17

22‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

24‐Aug‐17

13‐Sep‐17

14‐Sep‐17

22‐Jul‐19

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

24‐Aug‐17

13‐Sep‐17

14‐Sep‐17

95%

95%

0%

0.092%

0.092%

1036

2

CIVIL

DEM‐3963‐FAHM‐1‐50‐0001

DEM

FAHAHIL MAIN DEGASSING STATION  EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING

3

0.083%

31‐May‐17

10‐Jun‐17

22‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

20‐Jul‐17

10‐Aug‐17

22‐Aug‐17

23‐Aug‐17

20‐Jul‐17

10‐Aug‐17

22‐Aug‐17

23‐Aug‐17

1037

2

CIVIL

DEM‐3963‐FAHM‐1‐50‐0002

DEM

FAHAHIL MAIN DEGASSING STATION  EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAWIN

3

A

0.097%

31‐May‐17

10‐Jun‐17

22‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

19‐Jul‐17

20‐Jul‐17

10‐Aug‐17

22‐Aug‐17

23‐Aug‐17

22‐Jul‐19

1‐Jun‐17

19‐Jul‐17

20‐Jul‐17

10‐Aug‐17

22‐Aug‐17

23‐Aug‐17

95%

95%

0%

0.092%

0.092%

1038

2

CIVIL

DEM‐3963‐FAHS‐1‐50‐0001

DEM

FAHAHIL SOUTH DEGASSING STATION  EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING

3

A

0.083%

31‐May‐17

10‐Jun‐17

22‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

30‐Jul‐17

31‐Jul‐17

3‐Sep‐17

19‐Sep‐17

20‐Sep‐17

22‐Jul‐19

1‐Jun‐17

30‐Jul‐17

31‐Jul‐17

3‐Sep‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.079%

0.079%

1039

2

CIVIL

DEM‐3963‐FAHS‐1‐50‐0002

DEM

FAHAHIL SOUTH DEGASSING STATION  EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAWI

3

A

0.083%

31‐May‐17

10‐Jun‐17

22‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

30‐Jul‐17

31‐Jul‐17

3‐Sep‐17

19‐Sep‐17

20‐Sep‐17

22‐Jul‐19

1‐Jun‐17

30‐Jul‐17

31‐Jul‐17

3‐Sep‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.079%

0.079%

1040

2

CIVIL

DEM‐3963‐JALM‐1‐50‐0001

DEM

JALEHA MAIN DEGASSING STATION  EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING

3

A

0.083%

31‐May‐17

10‐Jun‐17

22‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

29‐Aug‐17

20‐Sep‐17

21‐Nov‐17

22‐Jul‐19

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

29‐Aug‐17

20‐Sep‐17

21‐Nov‐17

95%

95%

0%

0.079%

0.079%

1041

2

CIVIL

DEM‐3963‐JALM‐1‐50‐0002

DEM

JALEHA MAIN DEGASSING STATION  EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAWING

3

A

0.083%

31‐May‐17

10‐Jun‐17

22‐Jun‐17

16‐Jul‐17

6‐Aug‐17

16‐Aug‐17

31‐Oct‐18

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

29‐Aug‐17

3‐Oct‐17

3‐Oct‐17

22‐Jul‐19

1‐Jun‐17

25‐Jul‐17

26‐Jul‐17

29‐Aug‐17

3‐Oct‐17

3‐Oct‐17

95%

95%

0%

0.079%

0.079%

1042

2

CIVIL

3963‐DGEN‐1‐12‐0002

OT

DESIGN CALCULATION FOR METERING SKID FOUNDATION

1

A

0.208%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

13‐Jul‐17

25‐Sep‐17

27‐Sep‐17

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

13‐Jul‐17

25‐Sep‐17

27‐Sep‐17

7‐Feb‐18

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.198%

0.198%

1043

2

CIVIL

3963‐DGEN‐1‐12‐0003

OT

DESIGN CALCULATION FOR TEST SEPARATOR PLATFORM

1

1

0.994%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

13‐Jul‐17

28‐Aug‐17

29‐Aug‐17

19‐Nov‐17

26‐Apr‐18

26‐Apr‐18

22‐Jul‐19

13‐Jul‐17

28‐Aug‐17

29‐Aug‐17

19‐Nov‐17

26‐Apr‐18

26‐Apr‐18

95%

95%

0%

0.945%

0.945%

1044

2

CIVIL

3963‐DGEN‐1‐12‐0004

OT

DESIGN CALCULATION FOR PIPE SLEEPERS

1

1

0.194%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

13‐Jul‐17

28‐Oct‐17

29‐Oct‐17

20‐Dec‐17

15‐Apr‐18

15‐Apr‐18

22‐Jul‐19

13‐Jul‐17

28‐Oct‐17

29‐Oct‐17

20‐Dec‐17

15‐Apr‐18

15‐Apr‐18

95%

95%

0%

0.185%

1045

2

CIVIL

3963‐DGEN‐1‐12‐0005

OT

DESIGN CALCULATION FOR PIPE SUPPORTS

1

0

0.194%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

8‐Jul‐17

6‐Nov‐17

13‐Nov‐17

21‐Apr‐18

2‐May‐18

2‐May‐18

22‐Jul‐19

8‐Jul‐17

6‐Nov‐17

13‐Nov‐17

21‐Apr‐18

2‐May‐18

2‐May‐18

95%

95%

0%

0.185%

0.185%

1046

2

CIVIL

3963‐DGEN‐1‐57‐0005

OT

TYPICAL DETAILS OF FIRE PROOFING 

1

A

0.111%

3‐May‐17

13‐May‐17

18‐May‐17

18‐Jun‐17

9‐Jul‐17

19‐Jul‐17

31‐Oct‐18

8‐Jun‐17

13‐Jun‐17

14‐Jun‐17

13‐Jul‐17

13‐Jul‐17

18‐Jul‐17

22‐Jul‐19

8‐Jun‐17

13‐Jun‐17

14‐Jun‐17

13‐Jul‐17

13‐Jul‐17

18‐Jul‐17

95%

95%

0%

0.106%

0.106%

1047

2

CIVIL

3963‐KAHN‐1‐66‐0004

OT

KHATIYAH NORTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

12‐Oct‐17

11‐Oct‐17

12‐Oct‐17

30‐Oct‐17

30‐Oct‐17

29‐Jan‐18

22‐Jul‐19

12‐Oct‐17

11‐Oct‐17

12‐Oct‐17

30‐Oct‐17

30‐Oct‐17

29‐Jan‐18

95%

95%

0%

0.013%

0.013%

CIVIL

3963‐KAHM‐1‐66‐0004

KHATIYAH MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS

1

A

21‐Nov‐17

1048

DEM

A

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

19‐Jul‐17

21‐Nov‐17

1‐Jun‐17

19‐Jul‐17

95%

0%

0.079%

0.079%

0.185%

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Oct‐18

19‐Oct‐17

23‐Oct‐17

25‐Oct‐17

5‐Feb‐18

22‐Jul‐19

19‐Oct‐17

23‐Oct‐17

25‐Oct‐17

5‐Feb‐18

95%

95%

0%

0.013%

0.013%

2

CIVIL

3963‐KAHS‐1‐66‐0004

OT

KHATIYAH SOUTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

25‐Oct‐17

26‐Oct‐17

4‐Dec‐17

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

19‐Oct‐17

25‐Oct‐17

26‐Oct‐17

4‐Dec‐17

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.013%

0.013%

CIVIL

3963‐FAHN‐1‐66‐0004

OT

FAHAHIL NORTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

1‐Nov‐17

20‐Nov‐17

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

1‐Nov‐17

20‐Nov‐17

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.013%

0.013%

CIVIL

3963‐FAHM‐1‐66‐0004

OT

FAHAHIL MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

1‐Nov‐17

21‐Feb‐18

22‐Jul‐19

19‐Oct‐17

31‐Oct‐17

1‐Nov‐17

21‐Nov‐17

21‐Feb‐18

95%

95%

0%

0.013%

0.013%

1052

2

CIVIL

3963‐FAHS‐1‐66‐0004

OT

FAHAHIL SOUTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

1‐Nov‐17

2‐Nov‐17

21‐Nov‐17

22‐Feb‐18

22‐Feb‐18

22‐Jul‐19

19‐Oct‐17

1‐Nov‐17

2‐Nov‐17

21‐Nov‐17

22‐Feb‐18

22‐Feb‐18

95%

95%

0%

0.013%

0.013%

1053

2

CIVIL

3963‐JALM‐1‐66‐0004

OT

JALEHA MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS

1

1

0.046%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

5‐Nov‐17

7‐Nov‐17

27‐Nov‐17

20‐Mar‐18

20‐Mar‐18

22‐Jul‐19

19‐Oct‐17

5‐Nov‐17

7‐Nov‐17

27‐Nov‐17

20‐Mar‐18

20‐Mar‐18

95%

95%

0%

0.044%

0.044%

1054

2

OT

KHATIYAH NORTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS

1

B

0.014%

14‐Jul‐17

26‐Jul‐17

21‐Feb‐18

5‐Feb‐18

95%

2

21‐Nov‐17

5‐Feb‐18

22‐Jul‐19

0.079%

1049

2

OT

A

1050 1051

2

DEM‐3963‐KAHS‐1‐50‐0001

21‐Feb‐18

CIVIL

3963‐KAHN‐1‐51‐0003

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

23‐Sep‐17

24‐Sep‐17

26‐Sep‐17

29‐Oct‐17

29‐Oct‐17

27‐Nov‐17

22‐Jul‐19

23‐Sep‐17

24‐Sep‐17

26‐Sep‐17

29‐Oct‐17

29‐Oct‐17

27‐Nov‐17

95%

95%

0%

0.013%

0.013%

1055

2

CIVIL

3963‐KAHM‐1‐51‐0003

OT

KHATIYAH MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

25‐Oct‐17

26‐Oct‐17

4‐Dec‐17

4‐Feb‐18

4‐Feb‐18

22‐Jul‐19

19‐Oct‐17

25‐Oct‐17

26‐Oct‐17

4‐Dec‐17

4‐Feb‐18

4‐Feb‐18

95%

95%

0%

0.013%

0.013%

1056

2

CIVIL

3963‐KAHS‐1‐51‐0003

OT

KHATIYAH SOUTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

1‐Nov‐17

2‐Nov‐17

26‐Nov‐17

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

19‐Oct‐17

1‐Nov‐17

2‐Nov‐17

26‐Nov‐17

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.013%

0.013%

1057

2

CIVIL

3963‐FAHN‐1‐51‐0003

OT

FAHAHIL NORTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

1‐Nov‐17

2‐Nov‐17

26‐Nov‐17

26‐Feb‐18

26‐Feb‐18

22‐Jul‐19

19‐Oct‐17

1‐Nov‐17

2‐Nov‐17

26‐Nov‐17

26‐Feb‐18

26‐Feb‐18

95%

95%

0%

0.013%

0.013%

1058

2

CIVIL

3963‐FAHM‐1‐51‐0003

OT

FAHAHIL MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

1‐Nov‐17

2‐Nov‐17

26‐Nov‐17

21‐Feb‐18

21‐Feb‐18

22‐Jul‐19

19‐Oct‐17

1‐Nov‐17

2‐Nov‐17

26‐Nov‐17

21‐Feb‐18

21‐Feb‐18

95%

95%

0%

0.013%

0.013%

1

A

22‐Jul‐19

1059

2

CIVIL

1‐Nov‐17

26‐Nov‐17

28‐Feb‐18

28‐Feb‐18

1‐Nov‐17

26‐Nov‐17

28‐Feb‐18

28‐Feb‐18

1060

2

CIVIL

3963‐JALM‐1‐51‐0003

OT

JALEHA MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS

1

1

0.046%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

5‐Nov‐17

7‐Nov‐17

26‐Nov‐17

20‐Mar‐18

20‐Mar‐18

22‐Jul‐19

19‐Oct‐17

5‐Nov‐17

7‐Nov‐17

26‐Nov‐17

20‐Mar‐18

20‐Mar‐18

95%

95%

0%

0.044%

0.044%

1061

2

CIVIL

3963‐KAHN‐1‐51‐0004

OT

KHATIYAH NORTH EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS

1

B

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

4‐Dec‐17

13‐Dec‐17

13‐Dec‐17

22‐Jul‐19

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

4‐Dec‐17

13‐Dec‐17

13‐Dec‐17

95%

95%

0%

0.013%

0.013%

1062

2

CIVIL

3963‐KAHS‐1‐51‐0004

OT

KHATIYAH SOUTH EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS

1

A

0.014%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

4‐Dec‐17

13‐Dec‐17

13‐Dec‐17

22‐Jul‐19

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

4‐Dec‐17

13‐Dec‐17

13‐Dec‐17

95%

95%

0%

0.013%

0.013%

1

A

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

1063

OT

FAHAHIL SOUTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS

0.014%

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

19‐Oct‐17

31‐Oct‐17

19‐Oct‐17

31‐Oct‐17

95%

95%

0%

0.013%

0.013%

CIVIL

3963‐KAHM‐1‐51‐0004

OT

KHATIYAH MAIN EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS

4‐Dec‐17

11‐Dec‐17

11‐Dec‐17

22‐Jul‐19

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

4‐Dec‐17

11‐Dec‐17

11‐Dec‐17

95%

95%

0%

0.000%

0.000%

2

CIVIL

3963‐KAHN‐1‐66‐0005

OT

KHATIYAH NORTH EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS

1

B

0.0%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

4‐Dec‐17

13‐Dec‐17

13‐Dec‐17

22‐Jul‐19

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

4‐Dec‐17

13‐Dec‐17

13‐Dec‐17

95%

95%

0%

0.000%

0.000%

CIVIL

3963‐KAHS‐1‐66‐0005

OT

KHATIYAH SOUTH EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS

1

B

0.000%

14‐Jul‐17

26‐Jul‐17

31‐Jul‐17

31‐Aug‐17

21‐Sep‐17

1‐Oct‐17

31‐Oct‐18

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

13‐Dec‐17

19‐Dec‐17

19‐Dec‐17

22‐Jul‐19

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

13‐Dec‐17

19‐Dec‐17

19‐Dec‐17

95%

95%

0%

0.000%

0.000%

26‐Jul‐17

31‐Jul‐17

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

28‐Nov‐17

28‐Nov‐17

29‐Nov‐17

CIVIL

3963‐KAHM‐1‐66‐0005

KHATIYAH MAIN EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS

1

4

CIVIL

3963‐DGEN‐1‐00‐0001

OT

MISCELLANEOUS ‐ CIVIL

0

2

CIVIL

3963‐JALM‐1‐66‐0002

OT

JALEHA MAIN DEGASSING STATION  METERING SKID FOUNDATION GA & RC DETAILS 

1

1069

2

CIVIL

3963‐KAHN‐1‐66‐0001

OT

KHATIYAH NORTH DEGASSING STATION  TEST SEPARATOR FOUNDATION GA & RC DETAILS 

1070

2

CIVIL

3963‐KAHM‐1‐66‐0001

OT

KHATIYAH MAIN DEGASSING STATION  TEST SEPARATOR FOUNDATION GA & RC DETAILS 

1071

2

CIVIL

3963‐KAHS‐1‐66‐0001

OT

KHATIYAH SOUTH DEGASSING STATION  TEST SEPARATOR FOUNDATION GA & RC DETAILS 

1

1072

2

CIVIL

3963‐DGEN‐1‐12‐0001

OT

DESIGN CALCULATION FOR TEST SEPARATOR FOUNDATION

1073

4

SAFETY

3963‐DGEN‐3‐04‐0002

OT

1074

4

SAFETY

3963‐DGEN‐3‐03‐0001

1075

4

SAFETY

1076

4

1077 1078 1079

2

0.000%

14‐Jul‐17

1‐Oct‐17

31‐Oct‐18

19‐Dec‐17

22‐Jul‐19

19‐Dec‐17

95%

95%

0%

0.000%

0.000%

0.000%

31‐Aug‐17

6‐Sep‐17

7‐Sep‐17

14‐Sep‐17

14‐Sep‐17

21‐Sep‐17

31‐Oct‐18

1‐Feb‐18

6‐Feb‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

22‐Jul‐19

1‐Feb‐18

6‐Feb‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

95%

95%

0%

0.000%

0.000%

A

0.171%

10‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

12‐Sep‐17

19‐Sep‐17

31‐Oct‐18

13‐Jul‐17

17‐Oct‐17

18‐Oct‐17

27‐Dec‐17

20‐Mar‐18

20‐Mar‐18

22‐Jul‐19

13‐Jul‐17

17‐Oct‐17

18‐Oct‐17

27‐Dec‐17

20‐Mar‐18

20‐Mar‐18

95%

95%

0%

0.163%

0.163%

1

B

0.139%

17‐May‐17

27‐May‐17

2‐Aug‐17

31‐Oct‐18

25‐May‐17

5‐Sep‐17

6‐Sep‐17

25‐Oct‐17

25‐Oct‐17

21‐Jan‐18

22‐Jul‐19

25‐May‐17

5‐Sep‐17

6‐Sep‐17

25‐Oct‐17

25‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.132%

0.132%

1

B

0.139%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

18‐Sep‐17

19‐Sep‐17

30‐Oct‐17

30‐Oct‐17

21‐Jan‐18

22‐Jul‐19

25‐May‐17

18‐Sep‐17

19‐Sep‐17

30‐Oct‐17

30‐Oct‐17

21‐Jan‐18

95%

95%

0%

0.132%

0.132%

B

0.139%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

13‐Jul‐17

18‐Sep‐17

20‐Sep‐17

1‐Nov‐17

1‐Nov‐17

21‐Jan‐18

22‐Jul‐19

13‐Jul‐17

18‐Sep‐17

20‐Sep‐17

1‐Nov‐17

1‐Nov‐17

21‐Jan‐18

95%

95%

0%

0.132%

0.132%

1

A

0.144%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

8‐Jul‐17

6‐Sep‐17

7‐Sep‐17

2‐Nov‐17

2‐Nov‐17

22‐Jan‐18

22‐Jul‐19

8‐Jul‐17

6‐Sep‐17

7‐Sep‐17

2‐Nov‐17

2‐Nov‐17

22‐Jan‐18

95%

95%

0%

0.137%

0.137%

PROJECT HSE PLAN

1

A

0.139%

1‐Apr‐17

11‐Apr‐17

16‐Apr‐17

17‐May‐17

7‐Jun‐17

17‐Jun‐17

31‐Oct‐18

26‐Mar‐17

29‐Mar‐17

5‐Apr‐17

5‐Apr‐17

8‐Jun‐17

8‐Jun‐17

22‐Jul‐19

26‐Mar‐17

29‐Mar‐17

5‐Apr‐17

5‐Apr‐17

8‐Jun‐17

8‐Jun‐17

95%

95%

0%

0.132%

0.132%

OT

FIRE & SAFETY PHILOSOPHY

1

B

0.139%

25‐Mar‐17

4‐Apr‐17

9‐Apr‐17

10‐May‐17

31‐May‐17

10‐Jun‐17

31‐Oct‐18

29‐Mar‐17

2‐Apr‐17

5‐Apr‐17

4‐May‐17

20‐Jun‐17

20‐Jun‐17

22‐Jul‐19

29‐Mar‐17

2‐Apr‐17

5‐Apr‐17

4‐May‐17

20‐Jun‐17

20‐Jun‐17

95%

95%

0%

0.132%

0.132%

3963‐DGEN‐3‐03‐0002

OT

HAZARDOUS AREA CLASSIFICATION PHILOSOPHY AND SCHEDULE FOR ALL DEGASSING STATIONS

1

B

0.139%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

3‐Apr‐17

19‐May‐17

21‐May‐17

4‐Jul‐17

13‐Jul‐17

18‐Jul‐17

22‐Jul‐19

3‐Apr‐17

19‐May‐17

21‐May‐17

4‐Jul‐17

13‐Jul‐17

18‐Jul‐17

95%

95%

0%

0.132%

SAFETY

3963‐DGEN‐3‐17‐0001

L

TERMS OF REFERENCE FOR HAZID

1

A

0.125%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

5‐Apr‐17

17‐Jul‐17

18‐Jul‐17

3‐Aug‐17

14‐Aug‐17

14‐Aug‐17

22‐Jul‐19

5‐Apr‐17

17‐Jul‐17

18‐Jul‐17

3‐Aug‐17

14‐Aug‐17

14‐Aug‐17

95%

95%

0%

0.119%

0.119%

4

SAFETY

3963‐DGEN‐3‐17‐0003

L

HAZID/ENVID CLOSE OUT REPORT

1

A

0.264%

15‐Jul‐17

25‐Jul‐17

30‐Jul‐17

30‐Aug‐17

13‐Sep‐17

20‐Sep‐17

31‐Oct‐18

14‐Nov‐17

16‐Dec‐17

17‐Dec‐17

22‐Jan‐18

5‐Feb‐18

5‐Feb‐18

22‐Jul‐19

14‐Nov‐17

16‐Dec‐17

17‐Dec‐17

22‐Jan‐18

5‐Feb‐18

5‐Feb‐18

95%

95%

0%

0.251%

0.251%

4

SAFETY

3963‐DGEN‐3‐17‐0004

L

TERMS OF REFERENCE FOR HAZOP

1

A

0.069%

15‐May‐17

25‐May‐17

30‐May‐17

30‐Jun‐17

21‐Jul‐17

31‐Jul‐17

31‐Oct‐18

5‐Apr‐17

18‐Oct‐17

19‐Oct‐17

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

22‐Jul‐19

5‐Apr‐17

18‐Oct‐17

19‐Oct‐17

24‐Jan‐18

24‐Jan‐18

24‐Jan‐18

95%

95%

0%

0.066%

0.066%

0.250%

25‐Jun‐17

10‐Jul‐17

31‐Oct‐18

21‐Nov‐17

21‐Nov‐17

4

SAFETY

3963‐DGEN‐3‐17‐0005

OT

L

HAZOP REPORT

1

C

26‐Jul‐17

31‐Jul‐17

2

1067

14‐Jul‐17

26‐Jul‐17

1064

1068

0.000%

14‐Jul‐17

1065 1066

2

3963‐FAHS‐1‐51‐0003

A

5‐Jul‐17

1‐Jun‐17

31‐Aug‐17

2‐Jul‐17

21‐Sep‐17

23‐Jul‐17

4‐Dec‐17

19‐Dec‐17

19‐Dec‐17

0.132%

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

11‐Nov‐17

19‐Nov‐17

10‐Jan‐18

23‐Jan‐18

23‐Jan‐18

11‐Nov‐17

19‐Nov‐17

10‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.238%

0.238%

1080

4

SAFETY

3963‐DGEN‐3‐17‐0006

L

HAZOP CLOSE OUT REPORT

1

A

0.250%

31‐Jul‐17

10‐Aug‐17

15‐Aug‐17

4‐Sep‐17

13‐Sep‐17

16‐Sep‐17

31‐Oct‐18

19‐Oct‐17

16‐Dec‐17

17‐Dec‐17

21‐Jan‐18

12‐Mar‐18

12‐Mar‐18

22‐Jul‐19

19‐Oct‐17

16‐Dec‐17

17‐Dec‐17

21‐Jan‐18

12‐Mar‐18

12‐Mar‐18

95%

95%

0%

0.238%

0.238%

1081

4

SAFETY

3963‐DGEN‐3‐17‐0008

OT

QRA ASSUMPTION REGISTER

1

A

0.069%

5‐May‐17

15‐May‐17

20‐May‐17

20‐Jun‐17

11‐Jul‐17

21‐Jul‐17

31‐Oct‐18

25‐May‐17

8‐Aug‐17

10‐Aug‐17

25‐Oct‐17

25‐Oct‐17

22‐Jan‐18

22‐Jul‐19

25‐May‐17

8‐Aug‐17

10‐Aug‐17

25‐Oct‐17

25‐Oct‐17

22‐Jan‐18

95%

95%

0%

0.066%

0.066%

10‐May‐17

20‐May‐17

20‐Jul‐17

10‐Aug‐17

20‐Jul‐17

10‐Aug‐17

19‐Jul‐17

22‐Jul‐19

4‐Dec‐17

1082

4

SAFETY

3963‐DGEN‐3‐17‐0010

OT

FRA ASSUMPTION REGISTER

1

A

0.125%

25‐May‐17

25‐Jun‐17

16‐Jul‐17

26‐Jul‐17

31‐Oct‐18

25‐May‐17

21‐Aug‐17

22‐Aug‐17

22‐Jul‐19

25‐May‐17

21‐Aug‐17

22‐Aug‐17

1083

4

SAFETY

3963‐DGEN‐3‐17‐0011

OT

FIRE RISK ASSESSMENT STUDY 

1

1

0.285%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

21‐Jun‐17

1‐Jan‐18

3‐Jan‐18

29‐Jan‐18

28‐Jul‐18

28‐Jul‐18

22‐Jul‐19

21‐Jun‐17

1‐Jan‐18

3‐Jan‐18

29‐Jan‐18

28‐Jul‐18

28‐Jul‐18

95%

95%

0%

0.270%

0.270%

1084

4

SAFETY

3963‐DGEN‐3‐17‐0012

OT

FIREWATER DEMAND AND AVAILABILITY REPORT

1

A

0.139%

20‐Apr‐17

30‐Apr‐17

5‐May‐17

5‐Jun‐17

26‐Jun‐17

6‐Jul‐17

31‐Oct‐18

5‐Apr‐17

9‐May‐17

10‐May‐17

15‐Jun‐17

15‐Jun‐17

4‐Oct‐17

22‐Jul‐19

5‐Apr‐17

9‐May‐17

19‐Jul‐17

10‐May‐17

15‐Jun‐17

15‐Jun‐17

4‐Oct‐17

95%

95%

95%

0%

0.132%

0.132%

1085

4

SAFETY

3963‐DGEN‐3‐17‐0013

OT

HSE ACTION TRACKING REGISTER

1

A

0.153%

10‐Aug‐17

20‐Aug‐17

25‐Aug‐17

12‐Sep‐17

18‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

8‐Jun‐18

10‐Jun‐18

10‐Aug‐18

9‐Sep‐18

9‐Sep‐18

22‐Jul‐19

19‐Oct‐17

8‐Jun‐18

10‐Jun‐18

10‐Aug‐18

9‐Sep‐18

9‐Sep‐18

95%

95%

0%

0.145%

0.145%

1086

4

SAFETY

3963‐DGEN‐3‐17‐0015

OT

TBE FOR FIRE FIGHINT & SAFETY EQUIPMENT 

1

2

0.153%

7‐Aug‐17

17‐Aug‐17

22‐Aug‐17

9‐Sep‐17

15‐Sep‐17

18‐Sep‐17

31‐Oct‐18

95%

0%

0%

0.119%

0.145%

0.119%

0.145%

19‐Oct‐17

29‐Nov‐17

3‐Dec‐17

6‐Feb‐18

28‐Mar‐18

28‐Mar‐18

22‐Jul‐19

19‐Oct‐17

29‐Nov‐17

3‐Dec‐17

6‐Feb‐18

28‐Mar‐18

28‐Mar‐18

1087

4

SAFETY

3963‐DGEN‐3‐15‐0001

OT

MATERIAL REQUISITION FOR DELUGE SKID

1

A

0.125%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

4‐Jul‐17

24‐Jul‐17

25‐Jul‐17

10‐Aug‐17

30‐Aug‐17

9‐Jan‐18

22‐Jul‐19

4‐Jul‐17

24‐Jul‐17

25‐Jul‐17

10‐Aug‐17

30‐Aug‐17

9‐Jan‐18

95%

95%

0%

0.119%

0.119%

1088

4

SAFETY

3963‐DGEN‐3‐15‐0002

OT

MATERIAL REQUISITION FOR FIRE FIGHTING SYSTEM

1

A

0.125%

5‐Jul‐17

15‐Jul‐17

20‐Jul‐17

20‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

4‐Jul‐17

24‐Jul‐17

25‐Jul‐17

10‐Aug‐17

30‐Aug‐17

3‐Jan‐18

22‐Jul‐19

4‐Jul‐17

24‐Jul‐17

25‐Jul‐17

10‐Aug‐17

30‐Aug‐17

3‐Jan‐18

95%

95%

0%

0.119%

0.119%

1089

4

SAFETY

1

B

30‐Aug‐17

30‐Aug‐17

3963‐DGEN‐3‐14‐0001

OT

DELUGE SKIDS SPECIFICATION

0.056%

20‐Apr‐17

5‐Jun‐17

26‐Jun‐17

9‐May‐17

11‐May‐17

9‐Jul‐17

9‐May‐17

11‐May‐17

9‐Jul‐17

1090

4

SAFETY

3963‐DGEN‐3‐14‐0002

OT

FIRE FIGHTING & SAFETY EQUIPMENT SPECIFIFCATION

1

C

0.125%

20‐Apr‐17

30‐Apr‐17

5‐May‐17

5‐Jun‐17

26‐Jun‐17

6‐Jul‐17

31‐Oct‐18

19‐Apr‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

26‐Jul‐17

27‐Jul‐17

22‐Jul‐19

19‐Apr‐17

9‐May‐17

10‐May‐17

1‐Jun‐17

26‐Jul‐17

27‐Jul‐17

95%

95%

0%

0.119%

0.119%

1091

4

SAFETY

3963‐DGEN‐3‐14‐0003

OT

PASSIVE FIRE PROTECTION‐SPECIFICATION

1

A

0.125%

9‐Apr‐17

19‐Apr‐17

24‐Apr‐17

25‐May‐17

15‐Jun‐17

25‐Jun‐17

31‐Oct‐18

19‐Apr‐17

24‐Apr‐17

26‐Apr‐17

6‐Jul‐17

12‐Jul‐17

17‐Jul‐17

22‐Jul‐19

19‐Apr‐17

24‐Apr‐17

26‐Apr‐17

6‐Jul‐17

12‐Jul‐17

17‐Jul‐17

95%

95%

0%

0.119%

0.119%

OT

DELUGE SYSTEM CALCULATION

1

B

0.125%

25‐Apr‐17

5‐May‐17

10‐May‐17

10‐Jun‐17

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

6‐Jun‐17

6‐Jun‐17

12‐Dec‐17

23‐Jan‐18

1092

5‐May‐17

3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHM)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

95%

95%

0%

0.066%

0.066%

3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHN)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

95%

95%

0%

0.066%

0.066%

3963‐FAHS‐3‐58‐0001

OT

3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHS)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

4

SAFETY

3963‐JALM‐3‐58‐0001

OT

3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (JALM)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

95%

95%

0%

0.066%

0.066%

4

SAFETY

3963‐KAHM‐3‐58‐0001

OT

3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHM)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

95%

95%

0%

0.066%

0.066%

SAFETY

3963‐KAHN‐3‐58‐0001

OT

3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHN)

1

A

0.069%

24‐May‐17

30‐Jul‐17

9‐Aug‐17

25‐May‐17

25‐May‐17

31‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

95%

95%

95%

95%

0%

0%

0.066%

0.119%

1096

4

22‐Jul‐19

0.119%

1097 1098

25‐Jan‐18

0%

0.053%

OT

25‐Jan‐18

95%

0.053%

OT

14‐Dec‐17

95%

0%

3963‐FAHN‐3‐58‐0001

1‐Jun‐17

23‐Jan‐18

95%

3963‐DGEN‐3‐12‐0001

31‐May‐17

5‐Apr‐17

95%

3963‐FAHM‐3‐58‐0001

25‐May‐17

12‐Dec‐17

3‐Jan‐18

SAFETY

31‐Oct‐18

6‐Jun‐17

5‐Apr‐17

SAFETY

9‐Aug‐17

6‐Jun‐17

22‐Jul‐19

SAFETY

30‐Jul‐17

5‐Apr‐17

3‐Jan‐18

4

9‐Jul‐17

31‐Oct‐18

5‐Apr‐17

4

SAFETY

11‐Jul‐17

31‐Oct‐18

1093

4

1‐Jul‐17

6‐Jul‐17

1094 1095

4

30‐Apr‐17

95%

95%

0.066%

0.066%

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

22‐Jul‐19

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

1099

4

SAFETY

3963‐KAHS‐3‐58‐0001

OT

3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHS)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

14‐Dec‐17

25‐Jan‐18

25‐Jan‐18

95%

95%

0%

0.066%

0.066%

1100

4

SAFETY

3963‐FAHM‐3‐60‐0001

OT

PASSIVE FIRE PROTECTION LAYOUT (FAHM)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.066%

0.066%

0.066%

1101

4

SAFETY

3963‐FAHN‐3‐60‐0001

OT

PASSIVE FIRE PROTECTION LAYOUT (FAHN)

1

2

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

8‐Jul‐18

8‐Jul‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

8‐Jul‐18

8‐Jul‐18

95%

95%

0%

0.066%

0.066%

1102

4

SAFETY

3963‐FAHS‐3‐60‐0001

OT

PASSIVE FIRE PROTECTION LAYOUT (FAHS)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

21‐Jul‐18

21‐Jul‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

21‐Jul‐18

21‐Jul‐18

95%

95%

0%

0.066%

0.066%

1103

4

SAFETY

3963‐JALM‐3‐60‐0001

OT

PASSIVE FIRE PROTECTION LAYOUT (JALM)

1

2

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

11‐Jul‐18

11‐Jul‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

11‐Jul‐18

11‐Jul‐18

95%

95%

0%

0.066%

1104

4

SAFETY

3963‐KAHM‐3‐60‐0001

OT

PASSIVE FIRE PROTECTION LAYOUT (KAHM)

1

2

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

11‐Jul‐18

11‐Jul‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

11‐Jul‐18

11‐Jul‐18

95%

95%

0%

0.066%

0.066%

1105

4

SAFETY

3963‐KAHN‐3‐60‐0001

OT

PASSIVE FIRE PROTECTION LAYOUT (KAHN)

1

2

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

26‐Aug‐18

26‐Aug‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

26‐Aug‐18

26‐Aug‐18

95%

95%

0%

0.066%

0.066%

1106

4

SAFETY

3963‐KAHS‐3‐60‐0001

OT

PASSIVE FIRE PROTECTION LAYOUT (KAHS)

1

2

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

11‐Jul‐18

11‐Jul‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

7‐Jan‐18

11‐Jul‐18

11‐Jul‐18

95%

95%

0%

0.066%

0.066%

1107

4

SAFETY

3963‐FAHM‐3‐54‐0001

OT

SAFETY SIGN LAYOUTS (FAHM)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

1108

4

SAFETY

3963‐FAHN‐3‐54‐0001

OT

SAFETY SIGN LAYOUTS (FAHN)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

16‐Dec‐17

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

16‐Dec‐17

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.066%

0.066%

1109

4

SAFETY

3963‐FAHS‐3‐54‐0001

OT

SAFETY SIGN LAYOUTS (FAHS)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

16‐Dec‐17

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

16‐Dec‐17

23‐Jan‐18

23‐Jan‐18

95%

95%

0%

0.066%

0.066%

1110

4

SAFETY

3963‐JALM‐3‐54‐0001

OT

SAFETY SIGN LAYOUTS (JALM)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

17‐Aug‐17

17‐Aug‐17

23‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

17‐Aug‐17

17‐Aug‐17

23‐Jan‐18

95%

95%

0%

0.066%

0.066%

1111

4

SAFETY

3963‐KAHM‐3‐54‐0001

1112

4

SAFETY

3963‐KAHN‐3‐54‐0001

OT

SAFETY SIGN LAYOUTS (KAHN)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

17‐Aug‐17

17‐Aug‐17

23‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

17‐Aug‐17

17‐Aug‐17

23‐Jan‐18

95%

95%

0%

0.066%

0.066%

1113

4

SAFETY

3963‐KAHS‐3‐54‐0001

OT

SAFETY SIGN LAYOUTS (KAHS)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

31‐May‐17

1‐Jun‐17

17‐Aug‐17

17‐Aug‐17

23‐Jan‐18

22‐Jul‐19

25‐May‐17

31‐May‐17

1‐Jun‐17

17‐Aug‐17

17‐Aug‐17

23‐Jan‐18

95%

95%

0%

0.066%

0.066%

1114

4

SAFETY

3963‐FAHM‐3‐59‐0001

OT

FIREWATER RING MAIN, P&ID (FAHM)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

11‐May‐17

11‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

22‐Jul‐19

11‐May‐17

11‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

95%

95%

0%

0.079%

0.079%

1115

4

SAFETY

3963‐FAHM‐3‐59‐0002

OT

FIREWATER DELUGE SYSTEM, P&ID (FAHM)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

9‐Jan‐18

22‐Jul‐19

3‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

9‐Jan‐18

95%

95%

0%

0.079%

0.079%

OT

SAFETY SIGN LAYOUTS (KAHM)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

Page 9 of 13

25‐May‐17

25‐May‐17

31‐May‐17

31‐May‐17

1‐Jun‐17

1‐Jun‐17

16‐Dec‐17

17‐Aug‐17

23‐Jan‐18

17‐Aug‐17

23‐Jan‐18

23‐Jan‐18

22‐Jul‐19

22‐Jul‐19

25‐May‐17

25‐May‐17

31‐May‐17

31‐May‐17

1‐Jun‐17

1‐Jun‐17

16‐Dec‐17

17‐Aug‐17

23‐Jan‐18

17‐Aug‐17

23‐Jan‐18

23‐Jan‐18

95%

95%

95%

95%

0%

0%

0.066%

0.066%

0.066%

Page 80 of 170

0.066%

0.066%

REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD

Engineering Document & Deliverables Register (EDDR)

REV D

100.000% SRN

DISCSE DISCIPLINE Q

DOC NO

ITEM CODE

DOC DESC

DOC CLASS

CURRENT REVISION

START

DRAFT/IDC

IFC

5%

0%

40%

Rev-D

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

25-Oct-18

IFA

IAWH

IAFC

AS-BUILT

START

DRAFT/IDC

IFC

65%

85%

95%

100%

5%

0%

40%

PLANNED

IFA

IAWH

IAFC

AS-BUILT

65%

85%

95%

100% ACTASBUIL T

ACTUAL

Deliverable Milestone Plan

Actual

Weight Factor % Variance

SRN

SEQ

WV

PLS

PLD

PLIFC

PLIFA

PLASBUILT

PLS

PLD

PLIFC

PLIFA

PLIAWH

PLIAFC

PLASBUILT

ACTS

ACTD

ACTIFC

ACTIFA

ACTIAWH

ACTIAFC

1116

4

SAFETY

3963‐FAHN‐3‐59‐0001

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

22‐Jul‐19

4‐May‐17

9‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

0.079%

0.079%

1117

4

SAFETY

3963‐FAHN‐3‐59‐0002

OT

FIREWATER DELUGE SYSTEM, P&ID (FAHN)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

22‐Jul‐19

3‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

95%

95%

0%

0.079%

0.079%

1118

4

SAFETY

3963‐FAHS‐3‐59‐0001

OT

FIREWATER RING MAIN, P&ID (FAHS)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

11‐May‐17

11‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

22‐Jul‐19

11‐May‐17

11‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

95%

95%

0%

0.079%

0.079%

1119

4

SAFETY

3963‐FAHS‐3‐59‐0002

OT

FIREWATER DELUGE SYSTEM, P&ID (FAHS)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

22‐Jul‐19

4‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

95%

95%

0%

0.079%

0.079%

1120

4

SAFETY

3963‐JALM‐3‐59‐0001

OT

FIREWATER RING MAIN, P&ID (JALM)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

11‐May‐17

11‐May‐17

11‐May‐17

17‐Aug‐17

17‐Aug‐17

11‐Jan‐18

22‐Jul‐19

11‐May‐17

11‐May‐17

11‐May‐17

17‐Aug‐17

17‐Aug‐17

11‐Jan‐18

95%

95%

0%

0.079%

0.079%

1121

4

SAFETY

3963‐JALM‐3‐59‐0002

OT

FIREWATER DELUGE SYSTEM, P&ID (JALM)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

22‐Jul‐19

4‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

95%

95%

0%

0.079%

0.079%

1122

4

SAFETY

3963‐KAHM‐3‐59‐0001

OT

FIREWATER RING MAIN, P&ID (KAHM)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

22‐Jul‐19

4‐May‐17

9‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

95%

95%

0%

0.079%

0.079%

1123

4

SAFETY

3963‐KAHM‐3‐59‐0002

OT

FIREWATER DELUGE SYSTEM, P&ID (KAHM)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

11‐May‐17

11‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

22‐Jul‐19

11‐May‐17

11‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

95%

95%

0%

0.079%

0.079%

1124

4

SAFETY

3963‐KAHN‐3‐59‐0001

OT

FIREWATER RING MAIN, P&ID (KAHN)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

9‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

22‐Jul‐19

3‐May‐17

9‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

95%

95%

0%

0.079%

0.079%

1125

4

SAFETY

3963‐KAHN‐3‐59‐0002

OT

FIREWATER DELUGE SYSTEM, P&ID (KAHN)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

11‐Jan‐18

22‐Jul‐19

4‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

11‐Jan‐18

95%

95%

0%

0.079%

0.079%

1126

4

SAFETY

3963‐KAHS‐3‐59‐0001

OT

FIREWATER RING MAIN, P&ID (KAHS)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

11‐May‐17

11‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

22‐Jul‐19

11‐May‐17

11‐May‐17

11‐May‐17

30‐Aug‐17

20‐Sep‐17

11‐Jan‐18

95%

95%

0%

0.079%

0.079%

1127

4

SAFETY

3963‐KAHS‐3‐59‐0002

OT

FIREWATER DELUGE SYSTEM, P&ID (KAHS)

1

A

0.083%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

4‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

22‐Jul‐19

4‐May‐17

9‐May‐17

11‐May‐17

27‐Aug‐17

20‐Sep‐17

10‐Jan‐18

95%

95%

0%

0.079%

1128

4

SAFETY

3963‐FAHM‐3‐13‐0001

OT

DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHM)

1

A

0.069%

7‐May‐17

17‐May‐17

22‐May‐17

22‐Jun‐17

13‐Jul‐17

23‐Jul‐17

31‐Oct‐18

10‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

22‐Jul‐19

10‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

95%

95%

0%

0.066%

0.066%

1129

4

SAFETY

3963‐FAHN‐3‐13‐0001

OT

DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHN)

1

A

0.069%

7‐May‐17

17‐May‐17

22‐May‐17

22‐Jun‐17

13‐Jul‐17

23‐Jul‐17

31‐Oct‐18

10‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

22‐Jul‐19

10‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

95%

95%

0%

0.066%

0.066%

1130

4

SAFETY

3963‐FAHS‐3‐13‐0001

OT

DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHS)

1

A

0.069%

7‐May‐17

17‐May‐17

22‐May‐17

22‐Jun‐17

13‐Jul‐17

23‐Jul‐17

31‐Oct‐18

10‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

22‐Jul‐19

10‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

95%

95%

0%

0.066%

0.066%

1131

PLIAWH

PLIAFC

SAFETY

3963‐JALM‐3‐13‐0001

DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(JALM)

1

A

0.069%

7‐May‐17

17‐May‐17

22‐May‐17

22‐Jun‐17

13‐Jul‐17

29‐Jun‐17

11‐Jan‐18

95%

95%

0%

0.066%

0.066%

SAFETY

3963‐KAHM‐3‐13‐0001

OT

DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHM)

1

A

0.069%

7‐May‐17

17‐May‐17

22‐May‐17

22‐Jun‐17

13‐Jul‐17

23‐Jul‐17

31‐Oct‐18

21‐May‐17

22‐May‐17

24‐May‐17

18‐Jul‐17

26‐Jul‐17

11‐Jan‐18

22‐Jul‐19

21‐May‐17

22‐May‐17

24‐May‐17

18‐Jul‐17

26‐Jul‐17

11‐Jan‐18

95%

95%

0%

0.066%

0.066%

SAFETY

3963‐KAHN‐3‐13‐0001

OT

DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHN)

1

A

0.069%

7‐May‐17

17‐May‐17

22‐May‐17

22‐Jun‐17

13‐Jul‐17

23‐Jul‐17

31‐Oct‐18

10‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

22‐Jul‐19

10‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

95%

95%

0%

0.066%

0.066%

7‐May‐17

17‐May‐17

22‐Jun‐17

13‐Jul‐17

23‐Jul‐17

31‐Oct‐18

10‐May‐17

31‐May‐17

1‐Jun‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

22‐Jul‐19

10‐May‐17

31‐May‐17

1‐Jun‐17

21‐Jun‐17

29‐Jun‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

29‐Jun‐17

11‐Jan‐18

22‐Jul‐19

21‐May‐17

22‐May‐17

24‐May‐17

21‐Jun‐17

SAFETY

3963‐KAHS‐3‐13‐0001

DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHS)

1

A

11‐Jan‐18

95%

95%

0%

0.066%

0.066%

1135

4

SAFETY

3963‐FAHM‐3‐13‐0002

OT

DATA SHEET FOR DELUGE SKIDS (FAHM)

1

B

0.069%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

7‐Aug‐17

24‐Jan‐18

22‐Jul‐19

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

7‐Aug‐17

24‐Jan‐18

95%

95%

0%

0.066%

0.066%

1136

4

SAFETY

3963‐FAHN‐3‐13‐0002

OT

DATA SHEET FOR DELUGE SKIDS (FAHN)

1

B

0.069%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

7‐Aug‐17

24‐Jan‐18

22‐Jul‐19

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

7‐Aug‐17

24‐Jan‐18

95%

95%

0%

0.066%

0.066%

1137

4

SAFETY

3963‐FAHS‐3‐13‐0002

OT

DATA SHEET FOR DELUGE SKIDS (FAHS)

1

B

0.069%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

7‐Aug‐17

24‐Jan‐18

22‐Jul‐19

3‐May‐17

11‐May‐17

11‐May‐17

24‐Jan‐18

95%

95%

0%

0.066%

0.066%

1138

4

SAFETY

3963‐JALM‐3‐13‐0002

OT

DATA SHEET FOR DELUGE SKIDS (JALM)

1

B

0.069%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

7‐Aug‐17

24‐Jan‐18

22‐Jul‐19

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

7‐Aug‐17

24‐Jan‐18

95%

95%

0%

0.066%

0.066%

1139

4

SAFETY

3963‐KAHM‐3‐13‐0002

OT

DATA SHEET FOR DELUGE SKIDS (KAHM)

1

B

0.056%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

10‐Aug‐17

24‐Jan‐18

22‐Jul‐19

3‐May‐17

11‐May‐17

11‐May‐17

19‐Jul‐17

10‐Aug‐17

24‐Jan‐18

95%

95%

0%

0.053%

0.053%

1140

4

SAFETY

3963‐KAHN‐3‐13‐0002

OT

DATA SHEET FOR DELUGE SKIDS (KAHN)

1

B

0.056%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

11‐May‐17

11‐May‐17

20‐Jul‐17

10‐Aug‐17

24‐Jan‐18

22‐Jul‐19

3‐May‐17

11‐May‐17

11‐May‐17

20‐Jul‐17

10‐Aug‐17

24‐Jan‐18

95%

95%

0%

0.053%

1141

4

SAFETY

3963‐KAHS‐3‐13‐0002

OT

DATA SHEET FOR DELUGE SKIDS (KAHS)

1

B

0.056%

26‐Apr‐17

6‐May‐17

11‐May‐17

11‐Jun‐17

2‐Jul‐17

12‐Jul‐17

31‐Oct‐18

3‐May‐17

11‐May‐17

11‐May‐17

20‐Jul‐17

10‐Aug‐17

24‐Jan‐18

22‐Jul‐19

3‐May‐17

11‐May‐17

11‐May‐17

20‐Jul‐17

10‐Aug‐17

24‐Jan‐18

95%

95%

0%

0.053%

0.053%

1142

4

SAFETY

3963‐JALM‐3‐56‐0001

OT

CAUSE & EFFECT CHART (F&G) (JALM)

1

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

22‐Jul‐19

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

95%

95%

0%

0.066%

0.066%

1143

1

A

0.056%

24‐May‐17

SAFETY

3963‐KAHS‐3‐56‐0001

25‐May‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

22‐Jul‐19

25‐May‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

4

SAFETY

3963‐FAHM‐3‐56‐0001

OT

CAUSE & EFFECT CHART (F&G) (FAHM)

1

A

0.056%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

22‐Jul‐19

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

95%

95%

0%

0.053%

0.053%

SAFETY

3963‐FAHN‐3‐56‐0001

OT

CAUSE & EFFECT CHART (F&G) (FAHN)

1

A

0.056%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

25‐Sep‐17

25‐Jan‐18

22‐Jul‐19

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

25‐Sep‐17

25‐Jan‐18

95%

95%

0%

0.053%

0.053%

CAUSE & EFFECT CHART (F&G) (FAHS)

1

A

0.056%

24‐May‐17

3‐Jun‐17

3‐Jun‐17

8‐Jun‐17

8‐Jun‐17

9‐Jul‐17

9‐Jul‐17

30‐Jul‐17

30‐Jul‐17

9‐Aug‐17

9‐Aug‐17

31‐Oct‐18

8‐Jun‐17

8‐Jun‐17

95%

95%

0%

0.053%

0.053%

4

OT

CAUSE & EFFECT CHART (F&G) (KAHS)

7‐Aug‐17

1144

4

OT

19‐Jul‐17

1145 1146

4

22‐May‐17

21‐May‐17

0.079%

4

0.069%

31‐Oct‐18

Actual WF

4

OT

23‐Jul‐17

Plan WF

1132

4

OT

DOC DESC

Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%

1133 1134

4

DOC NO

CURRENT REVISION A

Original BL WV

ITEM CODE OT FIREWATER RING MAIN, P&ID (FAHN)

DISCIPLINE

DOC CLASS 1

SHUTD OWN PACKA GE SHUTD OWN

0.053%

SAFETY

3963‐FAHS‐3‐56‐0001

31‐Oct‐18

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

22‐Jul‐19

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

95%

95%

0%

0.053%

0.053%

1147

4

SAFETY

3963‐KAHM‐3‐56‐0001

OT

CAUSE & EFFECT CHART (F&G) (KAHM)

1

A

0.056%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

22‐Jul‐19

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

95%

95%

0%

0.053%

0.053%

1148

4

SAFETY

3963‐KAHN‐3‐56‐0001

OT

CAUSE & EFFECT CHART (F&G) (KAHN)

1

A

0.056%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

22‐Jul‐19

25‐May‐17

8‐Jun‐17

8‐Jun‐17

17‐Jul‐17

30‐Aug‐17

25‐Jan‐18

95%

95%

0%

0.053%

0.053%

1149

4

SAFETY

DEM‐3963‐FAHM‐3‐55‐0002

DEM

DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (FAHM)

1

A

0.167%

8‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

15‐Sep‐17

25‐Sep‐17

31‐Oct‐18

11‐Jul‐17

11‐Jul‐17

11‐Jul‐17

25‐Jul‐17

25‐Jul‐17

23‐Aug‐17

22‐Jul‐19

11‐Jul‐17

11‐Jul‐17

11‐Jul‐17

25‐Jul‐17

25‐Jul‐17

23‐Aug‐17

95%

95%

0%

0.158%

0.158%

1150

4

SAFETY

DEM‐3963‐FAHN‐3‐55‐0002

DEM

DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (FAHN)

1

A

0.167%

8‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

15‐Sep‐17

25‐Sep‐17

31‐Oct‐18

11‐Jul‐17

11‐Jul‐17

11‐Jul‐17

25‐Jul‐17

25‐Jul‐17

23‐Aug‐17

22‐Jul‐19

11‐Jul‐17

11‐Jul‐17

11‐Jul‐17

25‐Jul‐17

25‐Jul‐17

23‐Aug‐17

95%

95%

0%

0.158%

0.158%

31‐Oct‐18

11‐Jul‐17

11‐Jul‐17

22‐Jul‐19

11‐Jul‐17

11‐Jul‐17

SAFETY

DEM‐3963‐KAHM‐3‐55‐0002

1152

4

SAFETY

DEM‐3963‐KAHN‐3‐55‐0002

DEM

DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (KAHN)

1

A

0.167%

8‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Aug‐17

15‐Sep‐17

25‐Sep‐17

31‐Oct‐18

8‐Jul‐17

8‐Jul‐17

11‐Jul‐17

25‐Jul‐17

25‐Jul‐17

23‐Aug‐17

22‐Jul‐19

8‐Jul‐17

8‐Jul‐17

11‐Jul‐17

25‐Jul‐17

25‐Jul‐17

23‐Aug‐17

95%

95%

0%

0.158%

0.158%

1153

1151

4

4

SAFETY

DEM‐3963‐JALM‐3‐55‐0002

DEM

DEM

DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (JALM)

DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (KAHM)

1

1

A

A

0.167%

0.167%

8‐Jul‐17

8‐Jul‐17

20‐Jul‐17

20‐Jul‐17

25‐Jul‐17

25‐Jul‐17

25‐Aug‐17

25‐Aug‐17

15‐Sep‐17

15‐Sep‐17

25‐Sep‐17

25‐Sep‐17

31‐Oct‐18

8‐Jul‐17

8‐Jul‐17

11‐Jul‐17

25‐Jul‐17

25‐Jul‐17

23‐Aug‐17

22‐Jul‐19

8‐Jul‐17

8‐Jul‐17

11‐Jul‐17

25‐Jul‐17

25‐Jul‐17

23‐Aug‐17

95%

95%

0%

0.158%

0.158%

21‐Sep‐17

4‐Dec‐17

4‐Dec‐17

23‐Aug‐17

5‐Sep‐17

14‐Sep‐17

11‐Jul‐17

21‐Sep‐17

25‐Jul‐17

4‐Dec‐17

25‐Jul‐17

4‐Dec‐17

23‐Aug‐17

4‐Dec‐17

95%

95%

95%

95%

0%

0%

0.158%

0.013%

0.158%

4

SAFETY

3963‐DGEN‐3‐62‐0001

OT

F&G SCHEMATIC DIAGRAM (TYPICAL)

1

B

0.014%

5‐Sep‐17

21‐Sep‐17

28‐Sep‐17

10‐Oct‐17

20‐Oct‐17

4‐Nov‐17

4‐Dec‐17

22‐Jul‐19

5

SAFETY

3963‐DGEN‐3‐00‐0001

OT

MISCELLANEOUS ‐ SAFETY

0

#N/A

0.056%

31‐Aug‐17

6‐Sep‐17

7‐Sep‐17

14‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

1‐Feb‐18

6‐Feb‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

22‐Jul‐19

1‐Feb‐18

6‐Feb‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

8‐Mar‐18

95%

95%

0%

0.053%

0.053%

1156

4

SAFETY

3963‐FAHM‐3‐50‐0001

OT

ESCAPE ROUTE LAYOUT (FAHM)

3

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

25‐May‐17

25‐May‐17

28‐Dec‐17

31‐Jan‐18

31‐Jan‐18

22‐Jul‐19

25‐May‐17

25‐May‐17

25‐May‐17

28‐Dec‐17

31‐Jan‐18

31‐Jan‐18

95%

95%

0%

0.066%

0.066%

1157

4

SAFETY

3963‐FAHN‐3‐50‐0001

OT

ESCAPE ROUTE LAYOUT (FAHN)

3

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

28‐Dec‐17

31‐Jan‐18

31‐Jan‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

28‐Dec‐17

31‐Jan‐18

31‐Jan‐18

95%

95%

0%

0.066%

0.066%

0.013%

3963‐FAHS‐3‐50‐0001

OT

ESCAPE ROUTE LAYOUT (FAHS)

3

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

28‐Dec‐17

20‐Mar‐18

20‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

28‐Dec‐17

20‐Mar‐18

20‐Mar‐18

95%

95%

0%

0.066%

0.066%

1159

4

SAFETY

3963‐JALM‐3‐50‐0001

OT

ESCAPE ROUTE LAYOUT (JALM)

3

A

0.083%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

25‐May‐17

25‐May‐17

28‐Dec‐17

14‐Mar‐18

14‐Mar‐18

22‐Jul‐19

25‐May‐17

25‐May‐17

25‐May‐17

28‐Dec‐17

14‐Mar‐18

14‐Mar‐18

95%

95%

0%

0.079%

0.079%

1160

4

SAFETY

3963‐KAHM‐3‐50‐0001

OT

ESCAPE ROUTE LAYOUT (KAHM)

3

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

28‐Dec‐17

14‐Mar‐18

14‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

28‐Dec‐17

14‐Mar‐18

14‐Mar‐18

95%

95%

0%

0.066%

0.066%

SAFETY

3963‐KAHN‐3‐50‐0001

1161

4

SAFETY

14‐Sep‐17

25‐Jul‐17

1154

4

5‐Sep‐17

25‐Jul‐17

1155

1158

31‐Oct‐18

11‐Jul‐17

3

A

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

28‐Dec‐17

14‐Mar‐18

14‐Mar‐18

25‐May‐17

27‐May‐17

28‐May‐17

28‐Dec‐17

14‐Mar‐18

14‐Mar‐18

95%

95%

0%

0.066%

0.066%

1162

4

SAFETY

3963‐KAHS‐3‐50‐0001

OT

ESCAPE ROUTE LAYOUT (KAHS)

3

A

0.069%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

2‐Jan‐18

14‐Mar‐18

14‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

2‐Jan‐18

14‐Mar‐18

14‐Mar‐18

95%

95%

0%

0.066%

0.066%

1163

4

SAFETY

3963‐JALM‐3‐55‐0001

OT

OT

CAUSE & EFFECT CHART (PROCESS) (JALM)

ESCAPE ROUTE LAYOUT (KAHN)

1

3

0.056%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

15‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

22‐Jul‐19

15‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

95%

95%

0%

0.053%

0.053%

1164

4

SAFETY

3963‐KAHS‐3‐55‐0001

OT

CAUSE & EFFECT CHART (PROCESS) (KAHS)

1

3

0.056%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

22‐Jul‐19

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

95%

95%

0%

0.053%

0.053%

1165

4

SAFETY

3963‐FAHM‐3‐55‐0001

OT

CAUSE & EFFECT CHART (PROCESS) (FAHM)

1

3

0.056%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

22‐Jul‐19

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

95%

95%

0%

0.053%

0.053%

1166

4

SAFETY

3963‐FAHN‐3‐55‐0001

OT

CAUSE & EFFECT CHART (PROCESS) (FAHN)

1

3

0.056%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

22‐Jul‐19

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

95%

95%

0%

0.053%

0.053%

1167

4

SAFETY

3963‐FAHS‐3‐55‐0001

OT

CAUSE & EFFECT CHART (PROCESS) (FAHS)

1

3

0.056%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

22‐Jul‐19

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

95%

95%

0%

0.053%

0.053%

1168

4

SAFETY

3963‐KAHM‐3‐55‐0001

OT

CAUSE & EFFECT CHART (PROCESS) (KAHM)

1

3

0.056%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

22‐Jul‐19

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

5‐May‐18

95%

95%

0%

0.053%

0.053%

1169

4

SAFETY

3963‐KAHN‐3‐55‐0001

OT

CAUSE & EFFECT CHART (PROCESS) (KAHN)

1

3

0.056%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

8‐Apr‐18

22‐Jul‐19

25‐May‐17

10‐Jul‐17

11‐Jul‐17

10‐Aug‐17

30‐Aug‐17

8‐Apr‐18

95%

95%

0%

0.053%

1170

4

SAFETY

3963‐KAHM‐3‐51‐0002

OT

KHATIYAH MAIN UNIT 24 HAZARDOUS AREA CLASSIFICATION LAYOUT

1

A

0.083%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

31‐Oct‐17

22‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

31‐Oct‐17

22‐Mar‐18

95%

95%

0%

0.079%

0.079%

1171

4

SAFETY

3963‐KAHN‐3‐51‐0002

OT

KHATIYAH NORTH UNIT 22 HAZARDOUS AREA CLASSIFICATION LAYOUT

1

A

0.083%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

31‐Oct‐17

22‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

31‐Oct‐17

22‐Mar‐18

95%

95%

0%

0.079%

0.079%

4

SAFETY

3963‐KAHS‐3‐51‐0002

OT

KHATIYAH SOUTH UNIT 23 HAZARDOUS AREA CLASSIFICATION LAYOUT

22‐Oct‐17

31‐Oct‐17

4

SAFETY

3963‐FAHS‐3‐51‐0002

OT

FAHAHIL SOUTH UNIT 13 HAZARDOUS AREA CLASSIFICATION LAYOUT

1

2

0.083%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

31‐Oct‐17

22‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

31‐Oct‐17

22‐Mar‐18

95%

95%

0%

0.079%

0.079%

4

SAFETY

3963‐JALM‐3‐51‐0002

OT

JALEHA MAIN UNIT 31 HAZARDOUS AREA CLASSIFICATION LAYOUT

1

A

0.069%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

31‐Oct‐17

22‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

31‐Oct‐17

22‐Mar‐18

95%

95%

0%

0.066%

0.066%

1175

4

SAFETY

3963‐DGEN‐3‐17‐0009

OT

QRA STUDY

1

0

0.229%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

21‐Jun‐17

21‐Jan‐18

28‐Jan‐18

27‐May‐18

28‐Jul‐18

28‐Jul‐18

22‐Jul‐19

21‐Jun‐17

21‐Jan‐18

28‐Jan‐18

27‐May‐18

28‐Jul‐18

28‐Jul‐18

95%

95%

0%

0.218%

0.218%

1176

4

SAFETY

1

1

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

3‐Nov‐17

19‐Nov‐17

21‐Nov‐17

21‐Jan‐18

20‐Mar‐18

20‐Mar‐18

22‐Jul‐19

3‐Nov‐17

19‐Nov‐17

21‐Nov‐17

21‐Jan‐18

20‐Mar‐18

20‐Mar‐18

95%

95%

0%

0.079%

0.079%

1177

4

SAFETY

3963‐DGEN‐3‐17‐0014

OT

TBE FOR DELUGE SKIDS

1

A

0.472%

7‐Aug‐17

17‐Aug‐17

22‐Aug‐17

9‐Sep‐17

15‐Sep‐17

18‐Sep‐17

31‐Oct‐18

19‐Oct‐17

18‐Dec‐17

21‐Dec‐17

18‐Jan‐18

6‐Feb‐18

6‐Feb‐18

22‐Jul‐19

19‐Oct‐17

18‐Dec‐17

21‐Dec‐17

18‐Jan‐18

6‐Feb‐18

6‐Feb‐18

95%

95%

0%

0.449%

1178

4

SAFETY

3963‐FAHM‐3‐51‐0001

OT

FAHAHIL MAIN UNIT 14 HAZARDOUS AREA CLASSIFICATION LAYOUT

1

1

0.069%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

20‐Oct‐17

22‐Oct‐17

21‐Jan‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

25‐May‐17

20‐Oct‐17

22‐Oct‐17

21‐Jan‐18

22‐Mar‐18

22‐Mar‐18

95%

95%

0%

0.066%

0.066%

1179

4

SAFETY

3963‐FAHN‐3‐51‐0002

OT

FAHAHIL NORTH UNIT 12 HAZARDOUS AREA CLASSIFICATION LAYOUT

1

A

0.083%

20‐May‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

21‐Jan‐18

22‐Mar‐18

22‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

21‐Jan‐18

22‐Mar‐18

22‐Mar‐18

95%

95%

0%

0.079%

0.079%

1180

5

INSTRUMENTA

3963‐DGEN‐4‐45‐0001

OT

SCOPE OF WORK FOR DIC SYSTEM MODIFICATION AT DUKHAN

1

A

0.111%

7‐Jun‐17

17‐Jun‐17

22‐Jun‐17

23‐Jul‐17

13‐Aug‐17

23‐Aug‐17

31‐Oct‐18

8‐Jun‐17

2‐Aug‐17

3‐Aug‐17

12‐Sep‐17

25‐Sep‐17

25‐Sep‐17

22‐Jul‐19

8‐Jun‐17

2‐Aug‐17

3‐Aug‐17

12‐Sep‐17

25‐Sep‐17

25‐Sep‐17

95%

95%

0%

0.106%

0.106%

1181

5

OT

11‐Jul‐17

0.083%

20‐May‐17

25‐Jun‐17

30‐May‐17

4‐Jun‐17

5‐Jul‐17

26‐Jul‐17

5‐Aug‐17

31‐Oct‐18

31‐Oct‐18

25‐May‐17

27‐May‐17

28‐May‐17

2‐Aug‐17

3‐Aug‐17

22‐Mar‐18

22‐Jul‐19

25‐May‐17

27‐May‐17

28‐May‐17

22‐Oct‐17

2‐Aug‐17

31‐Oct‐17

3‐Aug‐17

22‐Mar‐18

95%

95%

0%

0.079%

0.053%

1172

HAZID/ENVID REPORT

0.083%

22‐Jul‐19

1174

L

A

24‐May‐17

1173

3963‐DGEN‐3‐17‐0002

1

0.069%

0.079%

0.449%

INSTRUMENTA

3963‐DGEN‐4‐15‐0001

MATERIAL REQUISITION FOR ELECTRONIC INSTRUMENTS (PT/TT)

1

B

0.069%

26‐Jun‐17

6‐Jul‐17

11‐Aug‐17

1‐Sep‐17

11‐Sep‐17

31‐Oct‐18

29‐Jun‐17

18‐Jul‐17

19‐Jul‐17

20‐Sep‐17

22‐Jul‐19

29‐Jun‐17

18‐Jul‐17

19‐Jul‐17

20‐Sep‐17

95%

95%

0%

0.066%

0.066%

1182

5

INSTRUMENTA

3963‐DGEN‐4‐15‐0002

OT

MATERIAL REQUISITION FOR LEVEL GAUGES (MAGNETIC)

1

B

0.069%

20‐Jun‐17

30‐Jun‐17

5‐Jul‐17

5‐Aug‐17

26‐Aug‐17

5‐Sep‐17

31‐Oct‐18

22‐Jun‐17

19‐Jul‐17

20‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

22‐Jul‐19

22‐Jun‐17

19‐Jul‐17

20‐Jul‐17

2‐Aug‐17

3‐Aug‐17

28‐Sep‐17

95%

95%

0%

0.066%

0.066%

1183

5

INSTRUMENTA

3963‐DGEN‐4‐15‐0003

OT

MATERIAL REQUISITION FOR RESTRICTION ORIFICE

1

B

0.069%

28‐Jun‐17

8‐Jul‐17

13‐Jul‐17

13‐Aug‐17

3‐Sep‐17

13‐Sep‐17

31‐Oct‐18

29‐Jun‐17

26‐Jul‐17

27‐Jul‐17

10‐Aug‐17

21‐Aug‐17

22‐Aug‐17

22‐Jul‐19

29‐Jun‐17

26‐Jul‐17

27‐Jul‐17

10‐Aug‐17

21‐Aug‐17

22‐Aug‐17

95%

95%

0%

0.066%

0.066%

1184

5

INSTRUMENTA

3963‐DGEN‐4‐15‐0004

OT

MATERIAL REQUISITION FOR SHUTDOWN & BLOWDOWN VALVES

1

B

0.069%

29‐May‐17

8‐Jun‐17

13‐Jun‐17

14‐Jul‐17

4‐Aug‐17

14‐Aug‐17

31‐Oct‐18

31‐May‐17

18‐Jun‐17

19‐Jun‐17

18‐Aug‐17

28‐Sep‐17

28‐Sep‐17

22‐Jul‐19

31‐May‐17

18‐Jun‐17

19‐Jun‐17

18‐Aug‐17

28‐Sep‐17

28‐Sep‐17

95%

95%

0%

0.066%

0.066%

1185

5

INSTRUMENTA

3963‐DGEN‐4‐15‐0006

OT

MATERIAL REQUISITION FOR FIRE & GAS DEVICES

1

A

0.069%

24‐Jun‐17

4‐Jul‐17

9‐Jul‐17

9‐Aug‐17

30‐Aug‐17

9‐Sep‐17

31‐Oct‐18

29‐Jun‐17

19‐Jul‐17

20‐Jul‐17

2‐Aug‐17

3‐Aug‐17

1‐Oct‐17

22‐Jul‐19

29‐Jun‐17

19‐Jul‐17

20‐Jul‐17

2‐Aug‐17

3‐Aug‐17

1‐Oct‐17

95%

95%

0%

0.066%

0.066%

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

95%

95%

0%

0.092%

0.092%

1186

5

INSTRUMENTA

3963‐DGEN‐4‐15‐0014

1

A

14‐Jun‐17

24‐Jun‐17

31‐Oct‐18

8‐Jul‐17

6‐Aug‐17

8‐Aug‐17

1‐Oct‐17

12‐Oct‐17

12‐Oct‐17

8‐Jul‐17

6‐Aug‐17

8‐Aug‐17

1‐Oct‐17

12‐Oct‐17

12‐Oct‐17

1187

5

INSTRUMENTA

3963‐DGEN‐4‐17‐0014

OT

TECHNICAL BID EVALUATION FOR EXISTING SYSTEM MODIFICATIONS (HONEYWELL)

1

A

0.167%

19‐Aug‐17

29‐Aug‐17

3‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

28‐Nov‐17

30‐Nov‐17

13‐Dec‐17

26‐Dec‐17

26‐Dec‐17

22‐Jul‐19

19‐Oct‐17

28‐Nov‐17

30‐Nov‐17

13‐Dec‐17

26‐Dec‐17

26‐Dec‐17

95%

95%

0%

0.158%

0.158%

1188

5

INSTRUMENTA

3963‐DGEN‐4‐17‐0002

OT

OT

TECHNICAL BID EVALUATION FOR ELECTRONIC INSTRUMENTS (PT)

MATERIAL REQUISITION FOR EXISTING SYSTEM MODIFICATIONS (HONEYWELL)

1

B

0.139%

0.097%

26‐Aug‐17

5‐Sep‐17

10‐Sep‐17

17‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

4‐Nov‐17

6‐Nov‐17

30‐Nov‐17

7‐Feb‐18

7‐Feb‐18

22‐Jul‐19

19‐Oct‐17

4‐Nov‐17

6‐Nov‐17

30‐Nov‐17

7‐Feb‐18

7‐Feb‐18

95%

95%

0%

0.132%

0.132%

1189

5

INSTRUMENTA

3963‐DGEN‐4‐17‐0003

OT

TECHNICAL BID EVALUATION FOR LEVEL GAUGES (MAGNETIC)

1

A

0.139%

19‐Aug‐17

29‐Aug‐17

3‐Sep‐17

16‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

4‐Nov‐17

6‐Nov‐17

14‐Nov‐17

14‐Nov‐17

20‐Nov‐17

22‐Jul‐19

19‐Oct‐17

4‐Nov‐17

6‐Nov‐17

14‐Nov‐17

14‐Nov‐17

20‐Nov‐17

95%

95%

0%

0.132%

0.132%

1190

5

INSTRUMENTA

3963‐DGEN‐4‐17‐0004

OT

TECHNICAL BID EVALUATION FOR RESTRICTION ORIFICE

1

A

0.139%

30‐Aug‐17

14‐Sep‐17

21‐Sep‐17

31‐Oct‐18

19‐Oct‐17

18‐Dec‐17

10‐Jan‐18

18‐Jan‐18

18‐Jan‐18

18‐Jan‐18

22‐Jul‐19

19‐Oct‐17

18‐Dec‐17

10‐Jan‐18

18‐Jan‐18

18‐Jan‐18

18‐Jan‐18

1191

5

INSTRUMENTA

3963‐DGEN‐4‐17‐0005

OT

TECHNICAL BID EVALUATION FOR SHUTDOWN & BLOWDOWN VALVES

1

2

0.181%

22‐Jul‐17

1‐Aug‐17

6‐Aug‐17

24‐Aug‐17

3‐Sep‐17

13‐Sep‐17

31‐Oct‐18

27‐Jul‐17

27‐Nov‐17

30‐Nov‐17

21‐Dec‐17

26‐May‐18

26‐May‐18

22‐Jul‐19

27‐Jul‐17

27‐Nov‐17

30‐Nov‐17

21‐Dec‐17

26‐May‐18

26‐May‐18

95%

95%

0%

0.172%

0.172%

1192

5

INSTRUMENTA

3963‐DGEN‐4‐74‐0001

OT

HOOK‐UP DIAGRAM (PROCESS)

1

A

0.083%

2‐Aug‐17

12‐Aug‐17

17‐Aug‐17

7‐Sep‐17

16‐Sep‐17

19‐Sep‐17

31‐Oct‐18

1‐Aug‐17

2‐Aug‐17

3‐Aug‐17

29‐Aug‐17

18‐Oct‐17

19‐Oct‐17

22‐Jul‐19

1‐Aug‐17

2‐Aug‐17

3‐Aug‐17

29‐Aug‐17

18‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.079%

0.079%

1193

5

INSTRUMENTA

3963‐DGEN‐4‐74‐0002

OT

HOOK‐UP DIAGRAM PNEUMATIC)

1

A

0.083%

8‐Aug‐17

18‐Aug‐17

23‐Aug‐17

10‐Sep‐17

16‐Sep‐17

19‐Sep‐17

31‐Oct‐18

1‐Aug‐17

2‐Aug‐17

3‐Aug‐17

29‐Aug‐17

20‐Sep‐17

13‐Nov‐17

22‐Jul‐19

1‐Aug‐17

2‐Aug‐17

3‐Aug‐17

29‐Aug‐17

20‐Sep‐17

13‐Nov‐17

95%

95%

0%

0.079%

0.079%

OT

INSTRUMENT INSTALLATION DETAILS

19‐Oct‐17

0.111%

9‐Sep‐17

29‐Jun‐17

21‐Sep‐17

21‐Sep‐17

1‐Aug‐17

6‐Aug‐17

22‐Jul‐19

22‐Jul‐19

1‐Aug‐17

6‐Aug‐17

95%

95%

0%

0.132%

0.132%

1194

5

INSTRUMENTA

3963‐DGEN‐4‐78‐0001

1

A

16‐Aug‐17

26‐Aug‐17

31‐Aug‐17

15‐Sep‐17

21‐Sep‐17

21‐Sep‐17

31‐Oct‐18

8‐Aug‐17

5‐Sep‐17

20‐Sep‐17

8‐Aug‐17

5‐Sep‐17

20‐Sep‐17

19‐Oct‐17

95%

95%

0%

0.106%

0.106%

1195

5

INSTRUMENTA

3963‐FAHM‐4‐45‐0001

OT

SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (FAHM)

1

A

0.028%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

11‐Jul‐17

26‐Jul‐17

27‐Jul‐17

12‐Sep‐17

25‐Sep‐17

19‐Oct‐17

22‐Jul‐19

11‐Jul‐17

26‐Jul‐17

27‐Jul‐17

12‐Sep‐17

25‐Sep‐17

19‐Oct‐17

95%

95%

0%

0.026%

0.026%

1196

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0001

OT

DATA SHEET FOR PRESSURE GAUGES (FAHM)

1

B

0.028%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

17‐May‐17

13‐Jun‐17

14‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

22‐Jul‐19

17‐May‐17

13‐Jun‐17

14‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

95%

95%

0%

0.026%

0.026%

1197

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0002

OT

DATA SHEET FOR TEMP GAUGES (FAHM)

1

B

0.028%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

17‐May‐17

10‐Jun‐17

11‐Jun‐17

15‐Jul‐17

19‐Jul‐17

4‐Oct‐17

22‐Jul‐19

17‐May‐17

10‐Jun‐17

11‐Jun‐17

15‐Jul‐17

19‐Jul‐17

4‐Oct‐17

95%

95%

0%

0.026%

0.026%

1198

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0003

OT

DATA SHEET FOR PRESSURE TRANSMITTERS (FAHM)

1

B

0.028%

16‐May‐17

26‐May‐17

31‐May‐17

1‐Jul‐17

22‐Jul‐17

1‐Aug‐17

31‐Oct‐18

17‐May‐17

13‐Jun‐17

14‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

22‐Jul‐19

17‐May‐17

13‐Jun‐17

14‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

95%

95%

0%

0.026%

1199

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0004

OT

DATA SHEET FOR TEMP TRANSMITTERS (FAHM)

1

B

0.028%

16‐May‐17

26‐May‐17

31‐May‐17

1‐Jul‐17

22‐Jul‐17

1‐Aug‐17

31‐Oct‐18

15‐May‐17

10‐Jun‐17

11‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

22‐Jul‐19

15‐May‐17

10‐Jun‐17

11‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

95%

95%

0%

0.026%

0.026%

1200

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0005

OT

DATA SHEET FOR FLOWMETER ‐ CORIOLIS (FAHM)

1

A

0.042%

8‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

25‐May‐17

11‐Jul‐17

12‐Jul‐17

22‐Aug‐17

4‐Oct‐17

4‐Oct‐17

22‐Jul‐19

25‐May‐17

11‐Jul‐17

12‐Jul‐17

22‐Aug‐17

4‐Oct‐17

4‐Oct‐17

95%

95%

0%

0.040%

0.040%

1201

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0006

OT

DATA SHEET FOR LEVEL TRANSMITTERS (FAHM)

1

B

0.028%

22‐May‐17

1‐Jun‐17

6‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

15‐May‐17

19‐Jul‐17

20‐Jul‐17

14‐Sep‐17

25‐Sep‐17

14‐Dec‐17

22‐Jul‐19

15‐May‐17

19‐Jul‐17

20‐Jul‐17

14‐Sep‐17

25‐Sep‐17

14‐Dec‐17

95%

95%

0%

0.026%

0.026%

0.026%

1202

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0007

OT

DATA SHEET FOR BS&W ANALYSERS (FAHM)

1

A

0.042%

13‐May‐17

23‐May‐17

28‐May‐17

28‐Jun‐17

19‐Jul‐17

29‐Jul‐17

31‐Oct‐18

25‐May‐17

18‐Jun‐17

19‐Jun‐17

26‐Jul‐17

24‐Sep‐17

24‐Sep‐17

22‐Jul‐19

25‐May‐17

18‐Jun‐17

19‐Jun‐17

26‐Jul‐17

24‐Sep‐17

24‐Sep‐17

95%

95%

0%

0.040%

0.040%

1203

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0008

OT

DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (FAHM)

1

A

0.042%

2‐May‐17

12‐May‐17

17‐May‐17

17‐Jun‐17

8‐Jul‐17

18‐Jul‐17

31‐Oct‐18

4‐Apr‐17

15‐Aug‐17

17‐Aug‐17

27‐Sep‐17

18‐Oct‐17

26‐Dec‐17

22‐Jul‐19

4‐Apr‐17

15‐Aug‐17

17‐Aug‐17

27‐Sep‐17

18‐Oct‐17

26‐Dec‐17

95%

95%

0%

0.040%

0.040%

4‐May‐17

15‐Aug‐17

4‐May‐17

15‐Aug‐17

INSTRUMENTA

3963‐FAHM‐4‐13‐0009

DATA SHEET FOR CONTROL VALVES (FAHM)

1

A

0.042%

2‐May‐17

12‐May‐17

17‐May‐17

17‐Jun‐17

8‐Jul‐17

18‐Jul‐17

31‐Oct‐18

17‐Aug‐17

30‐Aug‐17

20‐Sep‐17

19‐Oct‐17

17‐Aug‐17

30‐Aug‐17

20‐Sep‐17

19‐Oct‐17

95%

95%

0%

0.040%

1205

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0010

OT

DATA SHEET FOR FLOWMETER ‐ VORTEX (FAHM)

1

A

0.042%

8‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

10‐May‐17

19‐Jun‐17

20‐Jun‐17

22‐Aug‐17

19‐Sep‐17

20‐Sep‐17

22‐Jul‐19

10‐May‐17

19‐Jun‐17

20‐Jun‐17

22‐Aug‐17

19‐Sep‐17

20‐Sep‐17

95%

95%

0%

0.040%

0.040%

1206

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0011

OT

DATA SHEET FOR RESTRICTION ORIFICE (FAHM)

1

A

0.028%

13‐May‐17

23‐May‐17

28‐May‐17

28‐Jun‐17

19‐Jul‐17

29‐Jul‐17

31‐Oct‐18

25‐May‐17

19‐Sep‐17

20‐Sep‐17

18‐Oct‐17

8‐Nov‐17

8‐Nov‐17

22‐Jul‐19

25‐May‐17

19‐Sep‐17

20‐Sep‐17

18‐Oct‐17

8‐Nov‐17

8‐Nov‐17

95%

95%

0%

0.026%

0.026%

95%

95%

0%

0.040%

0.040%

1204

5

OT

OT

1207

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0012

DATA SHEET FOR FIRE & GAS DEVICES (FAHM)

1

A

0.042%

22‐May‐17

1‐Jun‐17

6‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

15‐May‐17

24‐Jul‐17

10‐Aug‐17

28‐Sep‐17

22‐Jul‐19

15‐May‐17

18‐Jun‐17

24‐Jul‐17

10‐Aug‐17

28‐Sep‐17

5

INSTRUMENTA

3963‐FAHM‐4‐13‐0013

OT

DATA SHEET FOR LEVEL GAUGES (FAHM)

1

B

0.042%

23‐Jun‐17

28‐Jun‐17

1‐Jul‐17

1‐Aug‐17

22‐Aug‐17

1‐Sep‐17

31‐Oct‐18

15‐May‐17

19‐Jul‐17

20‐Jul‐17

20‐Jul‐17

22‐Aug‐17

23‐Aug‐17

22‐Jul‐19

15‐May‐17

19‐Jul‐17

20‐Jul‐17

20‐Jul‐17

22‐Aug‐17

23‐Aug‐17

95%

95%

0%

0.040%

0.040%

1209

5

INSTRUMENTA

3963‐FAHM‐4‐00‐0001

OT

INSTRUMENT INDEX (FAHM)

1

A

0.028%

30‐May‐17

9‐Jun‐17

14‐Jun‐17

15‐Jul‐17

5‐Aug‐17

15‐Aug‐17

31‐Oct‐18

31‐May‐17

10‐Jun‐17

11‐Jun‐17

2‐Aug‐17

3‐Aug‐17

5‐Oct‐17

22‐Jul‐19

31‐May‐17

10‐Jun‐17

11‐Jun‐17

2‐Aug‐17

3‐Aug‐17

5‐Oct‐17

95%

95%

0%

0.026%

0.026%

1210

5

INSTRUMENTA

3963‐FAHM‐4‐39‐0001

OT

INPUT / OUTPUT LIST ‐ DCS/ESD/F&G (FAHM)

1

A

0.028%

5‐Jun‐17

15‐Jun‐17

20‐Jun‐17

21‐Jul‐17

11‐Aug‐17

21‐Aug‐17

31‐Oct‐18

8‐Jun‐17

10‐Jul‐17

11‐Jul‐17

2‐Aug‐17

3‐Aug‐17

7‐Dec‐17

22‐Jul‐19

8‐Jun‐17

10‐Jul‐17

11‐Jul‐17

2‐Aug‐17

3‐Aug‐17

7‐Dec‐17

95%

95%

0%

0.026%

0.026%

1211

5

INSTRUMENTA

3963‐FAHM‐4‐67‐0001

OT

ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (FAHM)

1

A

0.028%

19‐Jun‐17

29‐Jun‐17

4‐Jul‐17

4‐Aug‐17

25‐Aug‐17

4‐Sep‐17

31‐Oct‐18

22‐Jun‐17

30‐Jul‐17

31‐Jul‐17

17‐Sep‐17

25‐Sep‐17

10‐Dec‐17

22‐Jul‐19

22‐Jun‐17

30‐Jul‐17

31‐Jul‐17

17‐Sep‐17

25‐Sep‐17

10‐Dec‐17

95%

95%

0%

0.026%

0.026%

1212

5

INSTRUMENTA

3963‐FAHM‐4‐37‐0001

OT

INSTRUMENT CABLE SCHEDULE ‐ DCS/ESD/F&G (FAHM)

1

A

0.028%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jun‐17

29‐Jul‐17

30‐Jul‐17

4‐Oct‐17

18‐Oct‐17

19‐Oct‐17

22‐Jul‐19

28‐Jun‐17

29‐Jul‐17

30‐Jul‐17

4‐Oct‐17

18‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.026%

1213

5

INSTRUMENTA

3963‐FAHM‐4‐30‐0002

OT

INSTRUMENT JUNCTION BOX SCHEDULE (FAHM)

1

A

0.028%

28‐Jun‐17

8‐Jul‐17

13‐Jul‐17

13‐Aug‐17

3‐Sep‐17

13‐Sep‐17

31‐Oct‐18

28‐Jun‐17

2‐Aug‐17

3‐Aug‐17

4‐Oct‐17

16‐Oct‐17

29‐Nov‐17

22‐Jul‐19

28‐Jun‐17

2‐Aug‐17

3‐Aug‐17

4‐Oct‐17

16‐Oct‐17

29‐Nov‐17

95%

95%

0%

0.026%

0.026%

1214

5

INSTRUMENTA

3963‐FAHM‐4‐31‐0001

OT

INSTRUMENT MTO’S (FAHM)

3

A

0.042%

10‐Aug‐17

20‐Aug‐17

25‐Aug‐17

8‐Sep‐17

13‐Sep‐17

13‐Sep‐17

31‐Oct‐18

28‐Sep‐17

29‐Sep‐17

1‐Oct‐17

8‐Nov‐17

8‐Nov‐17

14‐Dec‐17

22‐Jul‐19

28‐Sep‐17

29‐Sep‐17

1‐Oct‐17

8‐Nov‐17

8‐Nov‐17

14‐Dec‐17

95%

95%

0%

0.040%

0.040%

1215

5

INSTRUMENTA

3963‐FAHM‐4‐55‐0001

OT

INSTRUMENT CABLE BLOCK DIAGRAM (FAHM)

1

A

0.028%

6‐May‐17

16‐May‐17

21‐May‐17

21‐Jun‐17

12‐Jul‐17

22‐Jul‐17

31‐Oct‐18

25‐May‐17

5‐Jun‐17

5‐Jun‐17

26‐Jul‐17

10‐Aug‐17

19‐Oct‐17

22‐Jul‐19

25‐May‐17

5‐Jun‐17

5‐Jun‐17

26‐Jul‐17

10‐Aug‐17

19‐Oct‐17

95%

95%

0%

0.026%

0.026%

1216

5

INSTRUMENTA

3963‐FAHM‐4‐56‐0001

1

A

0.028%

13‐May‐17

23‐May‐17

28‐May‐17

28‐Jun‐17

29‐Jul‐17

31‐Oct‐18

25‐May‐17

5‐Jun‐17

5‐Jun‐17

26‐Jul‐17

10‐Aug‐17

19‐Oct‐17

22‐Jul‐19

25‐May‐17

5‐Jun‐17

5‐Jun‐17

26‐Jul‐17

10‐Aug‐17

19‐Oct‐17

1217

5

INSTRUMENTA

3963‐FAHM‐4‐50‐0001

OT

INSTRUMENT LOCATION LAYOUT (FAHM)

1

A

0.042%

29‐Apr‐17

9‐May‐17

14‐May‐17

14‐Jun‐17

5‐Jul‐17

15‐Jul‐17

31‐Oct‐18

18‐May‐17

19‐May‐17

21‐May‐17

5‐Oct‐17

12‐Oct‐17

12‐Oct‐17

22‐Jul‐19

18‐May‐17

19‐May‐17

21‐May‐17

5‐Oct‐17

12‐Oct‐17

12‐Oct‐17

95%

95%

0%

0.040%

0.040%

1218

5

INSTRUMENTA

3963‐FAHM‐4‐65‐0001

OT

INSTRUMENT INTERCONNECTION DIAGRAM (FAHM)

1

A

0.042%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

11‐Jul‐17

10‐Oct‐17

12‐Oct‐17

19‐Nov‐17

7‐Dec‐17

7‐Dec‐17

22‐Jul‐19

11‐Jul‐17

10‐Oct‐17

12‐Oct‐17

19‐Nov‐17

7‐Dec‐17

7‐Dec‐17

95%

95%

0%

0.040%

0.040%

1219

5

INSTRUMENTA

3963‐FAHM‐4‐65‐0002

OT

FIRE & GAS INTERCONNECTION DIAGRAM (FAHM)

1

A

0.042%

21‐Jun‐17

1‐Jul‐17

6‐Jul‐17

6‐Aug‐17

27‐Aug‐17

6‐Sep‐17

31‐Oct‐18

22‐Jun‐17

20‐Oct‐17

22‐Oct‐17

27‐Nov‐17

11‐Dec‐17

11‐Dec‐17

22‐Jul‐19

22‐Jun‐17

20‐Oct‐17

22‐Oct‐17

27‐Nov‐17

11‐Dec‐17

11‐Dec‐17

95%

95%

0%

0.040%

0.040%

1220

5

INSTRUMENTA

3963‐FAHM‐4‐66‐0001

OT

INSTRUMENT LOOP DIAGRAM (FAHM)

1

A

0.056%

18‐Jul‐17

23‐Jul‐17

23‐Aug‐17

17‐Sep‐17

31‐Oct‐18

11‐Jul‐17

17‐Nov‐17

19‐Nov‐17

7‐Dec‐17

12‐Mar‐18

12‐Mar‐18

22‐Jul‐19

11‐Jul‐17

17‐Nov‐17

19‐Nov‐17

7‐Dec‐17

12‐Mar‐18

12‐Mar‐18

1221

5

INSTRUMENTA

3963‐FAHM‐4‐66‐0002

OT

FIRE & GAS LOOP DIAGRAM (FAHM)

1

A

0.028%

29‐Jul‐17

8‐Aug‐17

13‐Aug‐17

31‐Aug‐17

10‐Sep‐17

20‐Sep‐17

31‐Oct‐18

19‐Oct‐17

4‐Nov‐17

6‐Nov‐17

29‐Nov‐17

11‐Jan‐18

11‐Jan‐18

22‐Jul‐19

19‐Oct‐17

4‐Nov‐17

6‐Nov‐17

29‐Nov‐17

11‐Jan‐18

11‐Jan‐18

95%

95%

0%

0.026%

0.026%

1222

5

INSTRUMENTA

3963‐FAHN‐4‐45‐0001

OT

SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (FAHN)

1

A

0.028%

14‐Jun‐17

24‐Jun‐17

29‐Jun‐17

30‐Jul‐17

20‐Aug‐17

30‐Aug‐17

31‐Oct‐18

8‐Jul‐17

26‐Jul‐17

27‐Jul‐17

12‐Sep‐17

25‐Sep‐17

19‐Oct‐17

22‐Jul‐19

8‐Jul‐17

26‐Jul‐17

27‐Jul‐17

12‐Sep‐17

25‐Sep‐17

19‐Oct‐17

95%

95%

0%

0.026%

0.026%

1223

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0001

OT

DATA SHEET FOR PRESSURE GAUGES (FAHN)

1

B

0.028%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

15‐May‐17

13‐Jun‐17

14‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

22‐Jul‐19

15‐May‐17

13‐Jun‐17

14‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

95%

95%

0%

0.026%

0.026%

1224

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0002

OT

DATA SHEET FOR TEMP GAUGES (FAHN)

1

B

0.028%

24‐May‐17

3‐Jun‐17

8‐Jun‐17

9‐Jul‐17

30‐Jul‐17

9‐Aug‐17

31‐Oct‐18

15‐May‐17

10‐Jun‐17

11‐Jun‐17

15‐Jul‐17

19‐Jul‐17

4‐Oct‐17

22‐Jul‐19

15‐May‐17

10‐Jun‐17

11‐Jun‐17

15‐Jul‐17

19‐Jul‐17

4‐Oct‐17

95%

95%

0%

0.026%

0.026%

1225

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0003

OT

DATA SHEET FOR PRESSURE TRANSMITTERS (FAHN)

1

B

0.028%

16‐May‐17

26‐May‐17

31‐May‐17

1‐Jul‐17

22‐Jul‐17

1‐Aug‐17

31‐Oct‐18

15‐May‐17

13‐Jun‐17

14‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

22‐Jul‐19

15‐May‐17

13‐Jun‐17

14‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

95%

95%

0%

0.026%

1226

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0004

OT

DATA SHEET FOR TEMP TRANSMITTERS (FAHN)

1

B

0.028%

16‐May‐17

26‐May‐17

31‐May‐17

1‐Jul‐17

22‐Jul‐17

1‐Aug‐17

31‐Oct‐18

15‐May‐17

10‐Jun‐17

11‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

22‐Jul‐19

15‐May‐17

10‐Jun‐17

11‐Jun‐17

15‐Jul‐17

19‐Jul‐17

24‐Sep‐17

95%

95%

0%

0.026%

0.026%

1227

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0005

OT

DATA SHEET FOR FLOWMETER ‐ CORIOLIS (FAHN)

1

A

0.042%

8‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

25‐May‐17

11‐Jul‐17

12‐Jul‐17

22‐Aug‐17

4‐Oct‐17

4‐Oct‐17

22‐Jul‐19

25‐May‐17

11‐Jul‐17

12‐Jul‐17

22‐Aug‐17

4‐Oct‐17

4‐Oct‐17

95%

95%

0%

0.040%

0.040%

1228

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0006

OT

DATA SHEET FOR LEVEL TRANSMITTERS (FAHN)

1

B

0.028%

22‐May‐17

1‐Jun‐17

6‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

17‐May‐17

19‐Jul‐17

20‐Jul‐17

14‐Sep‐17

25‐Sep‐17

14‐Dec‐17

22‐Jul‐19

17‐May‐17

19‐Jul‐17

20‐Jul‐17

14‐Sep‐17

25‐Sep‐17

14‐Dec‐17

95%

95%

0%

0.026%

0.026%

F&G CABLE BLOCK DIAGRAM (FAHM)

8‐Jul‐17

19‐Jul‐17

10‐Sep‐17

18‐Jun‐17

17‐Jun‐17

0.040%

1208

OT

17‐Jun‐17

22‐Jul‐19

95%

95%

95%

95%

0%

0%

0.026%

0.053%

0.026%

0.026%

0.053%

0.026%

1229

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0007

OT

DATA SHEET FOR BS&W ANALYSERS (FAHN)

1

A

0.042%

13‐May‐17

23‐May‐17

28‐May‐17

28‐Jun‐17

19‐Jul‐17

29‐Jul‐17

31‐Oct‐18

25‐May‐17

18‐Jun‐17

19‐Jun‐17

26‐Jul‐17

24‐Sep‐17

24‐Sep‐17

22‐Jul‐19

25‐May‐17

18‐Jun‐17

19‐Jun‐17

26‐Jul‐17

24‐Sep‐17

24‐Sep‐17

95%

95%

0%

0.040%

0.040%

1230

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0008

OT

DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (FAHN)

1

A

0.042%

2‐May‐17

12‐May‐17

17‐May‐17

17‐Jun‐17

8‐Jul‐17

18‐Jul‐17

31‐Oct‐18

4‐Apr‐17

15‐Aug‐17

17‐Aug‐17

27‐Sep‐17

18‐Oct‐17

26‐Dec‐17

22‐Jul‐19

4‐Apr‐17

15‐Aug‐17

17‐Aug‐17

27‐Sep‐17

18‐Oct‐17

26‐Dec‐17

95%

95%

0%

0.040%

0.040%

1231

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0009

DATA SHEET FOR CONTROL VALVES (FAHN)

1

A

0.042%

2‐May‐17

12‐May‐17

17‐May‐17

17‐Jun‐17

8‐Jul‐17

18‐Jul‐17

31‐Oct‐18

3‐Aug‐17

30‐Aug‐17

20‐Sep‐17

19‐Oct‐17

3‐Aug‐17

30‐Aug‐17

20‐Sep‐17

19‐Oct‐17

1232

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0010

OT

DATA SHEET FOR FLOWMETER ‐ VORTEX (FAHN)

1

B

0.042%

8‐May‐17

18‐May‐17

23‐May‐17

23‐Jun‐17

14‐Jul‐17

24‐Jul‐17

31‐Oct‐18

10‐May‐17

19‐Jun‐17

20‐Jun‐17

22‐Aug‐17

18‐Oct‐17

19‐Oct‐17

22‐Jul‐19

10‐May‐17

19‐Jun‐17

20‐Jun‐17

22‐Aug‐17

18‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.040%

0.040%

1233

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0011

OT

DATA SHEET FOR RESTRICTION ORIFICE (FAHN)

1

A

0.028%

13‐May‐17

23‐May‐17

28‐May‐17

28‐Jun‐17

19‐Jul‐17

29‐Jul‐17

31‐Oct‐18

25‐May‐17

19‐Sep‐17

20‐Sep‐17

18‐Oct‐17

8‐Nov‐17

8‐Nov‐17

22‐Jul‐19

25‐May‐17

19‐Sep‐17

20‐Sep‐17

18‐Oct‐17

8‐Nov‐17

8‐Nov‐17

95%

95%

0%

0.026%

0.026%

1234

5

INSTRUMENTA

3963‐FAHN‐4‐13‐0012

OT

DATA SHEET FOR FIRE & GAS DEVICES (FAHN)

1

A

0.042%

22‐May‐17

1‐Jun‐17

6‐Jun‐17

6‐Jul‐17

27‐Jul‐17

6‐Aug‐17

31‐Oct‐18

17‐May‐17

17‐Jun‐17

18‐Jun‐17

24‐Jul‐17

10‐Aug‐17

28‐Sep‐17

22‐Jul‐19

17‐May‐17

17‐Jun‐17

18‐Jun‐17

24‐Jul‐17

10‐Aug‐17

28‐Sep‐17

95%

95%

0%

0.040%

0.040%

1235

5

1

B

28‐Jun‐17

1‐Jul‐17

1‐Aug‐17

22‐Aug‐17

6‐Aug‐17

20‐Jul‐17

OT

3‐May‐17

1‐Aug‐17

22‐Jul‐19

3‐May‐17

1‐Aug‐17

95%

95%

0%

0.040%

0.040%

INSTRUMENTA

3963‐FAHN‐4‐13‐0013

OT

DATA SHEET FOR LEVEL GAUGES (FAHN)

0.042%

23‐Jun‐17

31‐Oct‐18

15‐May‐17

19‐Jul‐17

20‐Jul‐17

20‐Jul‐17

22‐Aug‐17

23‐Aug‐17

22‐Jul‐19

15‐May‐17

19‐Jul‐17

20‐Jul‐17

22‐Aug‐17

23‐Aug‐17

95%

95%

0%

0.040%

0.040%

1236

5

INSTRUMENTA

3963‐FAHN‐4‐00‐0001

OT

INSTRUMENT INDEX (FAHN)

1

A

0.028%

30‐May‐17

9‐Jun‐17

14‐Jun‐17

15‐Jul‐17

5‐Aug‐17

15‐Aug‐17

31‐Oct‐18

31‐May‐17

10‐Jun‐17

11‐Jun‐17

2‐Aug‐17

3‐Aug‐17

20‐Nov‐17

22‐Jul‐19

31‐May‐17

10‐Jun‐17

11‐Jun‐17

2‐Aug‐17

3‐Aug‐17

20‐Nov‐17

95%

95%

0%

0.026%

0.026%

1237

5

INSTRUMENTA

3963‐FAHN‐4‐39‐0001

OT

INPUT / OUTPUT LIST ‐ DCS/ESD/F&G (FAHN)

1

A

0.028%

5‐Jun‐17

15‐Jun‐17

20‐Jun‐17

21‐Jul‐17

11‐Aug‐17

21‐Aug‐17

31‐Oct‐18

8‐Jun‐17

10‐Jul‐17

11‐Jul‐17

2‐Aug‐17

3‐Aug‐17

7‐Dec‐17

22‐Jul‐19

8‐Jun‐17

10‐Jul‐17

11‐Jul‐17

2‐Aug‐17

3‐Aug‐17

7‐Dec‐17

95%

95%

0%

0.026%

0.026%

1238

5

INSTRUMENTA

3963‐FAHN‐4‐67‐0001

OT

ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (FAHN)

1

A

0.028%

19‐Jun‐17

29‐Jun‐17

4‐Jul‐17

4‐Aug‐17

25‐Aug‐17

4‐Sep‐17

31‐Oct‐18

22‐Jun‐17

30‐Jul‐17

31‐Jul‐17

17‐Sep‐17

25‐Sep‐17

10‐Dec‐17

22‐Jul‐19

22‐Jun‐17

30‐Jul‐17

31‐Jul‐17

17‐Sep‐17

25‐Sep‐17

10‐Dec‐17

95%

95%

0%

0.026%

0.026%

1239

5

INSTRUMENTA

3963‐FAHN‐4‐37‐0001

OT

INSTRUMENT CABLE SCHEDULE ‐ DCS/ESD/F&G (FAHN)

1

A

0.028%

25‐Jun‐17

5‐Jul‐17

10‐Jul‐17

10‐Aug‐17

31‐Aug‐17

10‐Sep‐17

31‐Oct‐18

28‐Jun‐17

29‐Jul‐17

30‐Jul‐17

4‐Oct‐17

18‐Oct‐17

19‐Oct‐17

22‐Jul‐19

28‐Jun‐17

29‐Jul‐17

30‐Jul‐17

4‐Oct‐17

18‐Oct‐17

19‐Oct‐17

95%

95%

0%

0.026%

0.026%

Page 10 of 13

Page 81 of 170

PROJECT PLANNING PACKAGE

Attachment 8

PROCUREMENT REGISTER

Page 82 of 170

Procurement Control Register - Equipment Project No. - 3963 "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" As Of : 25-Oct-18 SL. No.

Description

Proc. Category

Sec.

Progress Scale

1.0 LONG LEAD ITEMS

Issue MR

Issue RFQ to Vendors

Issue Purchase Order

Approve Vendor Document (QP)

5%

10%

15%

30%

Received Filled SPIR Inspection cleared & Ex-works Del. & FOB (Mftg.) FAT Complete

40%

60%

70%

Materails received and cleared at site

QP inspected and cleared material at site

All Spare parts received & SPIR completed

% Weight

85%

90%

100%

WTGE

P 75.80%

F A

1

1.2 BS&W Meter 1.3 Sand Jetting

% Variance

75.800%

(10.569)

65.231%

0.00%

65.231%

P F A P F A P F A

13-May-17 28-May-17 28-May-17 01-Jun-17 12-Jul-17 12-Jul-17 13-May-17 28-May-17 28-May-17

13-May-17 12-Jun-17 12-Jun-17 01-Jun-17 23-Jul-17 23-Jul-17 13-May-17 12-Jun-17 12-Jun-17

19-Jul-17 12-Sep-17 12-Sep-17 09-Aug-17 18-Jan-18 18-Jan-18 19-Jul-17 12-Sep-17 12-Sep-17

10-Sep-17 26-Oct-17 26-Oct-17 12-Oct-17 17-May-18 17-May-18 10-Sep-17 26-Oct-17 26-Oct-17

08-Dec-17 18-Jan-18 18-Jan-18 09-Jan-18 24-May-18 24-May-18 08-Dec-17 18-Jan-18 18-Jan-18

04-Jul-18 11-Jun-18 11-Jun-18 12-Feb-18 12-Jul-18 12-Jul-18 04-Jul-18 11-Jun-18 11-Jun-18

10-Jul-18 14-Jun-18 14-Jun-18 18-Feb-18 30-Aug-18 30-Aug-18 10-Jul-18 14-Jun-18 14-Jun-18

24-Jul-18 03-Jul-18 03-Jul-18 03-Apr-18 04-Oct-18 04-Oct-18 24-Jul-18 03-Jul-18 03-Jul-18

27-Jul-18 25-Aug-18 25-Aug-18 06-Apr-18 29-Nov-18

27-Jul-18 25-Aug-18 25-Aug-18 06-Apr-18 29-Nov-18

27-Jul-18 25-Aug-18 25-Aug-18

27-Jul-18 25-Aug-18 25-Aug-18

1.47%

P F A

03-Apr-17 03-Apr-17 03-Apr-17

03-Apr-17 03-Apr-17 03-Apr-17

08-May-17 11-May-17 11-May-17

27-May-17 04-Jul-17 04-Jul-17

15-Jun-17 03-Aug-17 03-Aug-17

15-Aug-17 24-Aug-17 24-Aug-17

28-Aug-17 21-Sep-17 21-Sep-17

30-Sep-17 31-Oct-17 31-Oct-17

04-Oct-17 27-Nov-17 27-Nov-17

04-Oct-17 27-Nov-17 27-Nov-17

1.51%

P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A

10-Aug-17 19-Jul-17 19-Jul-17 10-Aug-17 24-Jul-17 24-Jul-17 10-Aug-17 20-Jul-17 20-Jul-17 10-Aug-17 24-Jul-17 24-Jul-17 10-Aug-17 25-Jul-17 25-Jul-17 10-Aug-17 25-Jul-17 25-Jul-17 15-Jun-17 02-Aug-17 02-Aug-17 15-Jun-17 19-Jun-17 19-Jun-17 15-Jun-17 13-Jul-17 13-Jul-17 15-Jun-17 03-Aug-17 03-Aug-17

10-Aug-17 23-Jul-17 23-Jul-17 10-Aug-17 26-Jul-17 26-Jul-17 10-Aug-17 23-Jul-17 23-Jul-17 10-Aug-17 26-Jul-17 26-Jul-17 10-Aug-17 30-Jul-17 30-Jul-17 10-Aug-17 30-Jul-17 30-Jul-17 15-Jun-17 12-Nov-17 12-Nov-17 15-Jun-17 20-Aug-17 20-Aug-17 15-Jun-17 23-Jul-17 23-Jul-17 15-Jun-17 06-Aug-17 06-Aug-17

19-Oct-17 18-Jan-18 18-Jan-18 19-Oct-17 12-Dec-17 12-Dec-17 19-Oct-17 30-Jan-18 30-Jan-18 19-Oct-17 15-Feb-18 15-Feb-18 19-Oct-17 28-Dec-17 28-Dec-17 19-Oct-17 30-Jan-18 30-Jan-18 23-Aug-17 15-Feb-18 15-Feb-18 23-Aug-17 05-Apr-18 05-Apr-18 23-Aug-17 18-Jan-18 18-Jan-18 23-Aug-17 19-Nov-17 19-Nov-17

07-Dec-17 22-Apr-18 22-Apr-18 07-Dec-17 28-Mar-18 28-Mar-18 07-Dec-17 28-Mar-18 28-Mar-18 07-Dec-17 02-Sep-18 02-Sep-18 07-Dec-17 29-Apr-18 29-Apr-18 07-Dec-17 12-Apr-18 12-Apr-18 11-Oct-17 10-May-18 10-May-18 11-Oct-17 30-Aug-18 30-Aug-18 11-Oct-17 06-May-18 06-May-18 11-Oct-17 28-Dec-17 28-Dec-17

05-Jan-18 10-May-18 10-May-18 05-Jan-18 08-Feb-18 08-Feb-18 05-Jan-18 15-Feb-18 15-Feb-18 05-Jan-18 17-May-18 17-May-18 05-Jan-18 08-Feb-18 08-Feb-18 05-Jan-18 15-Mar-18 15-Mar-18 08-Jan-18 15-Mar-18 15-Mar-18 08-Jan-18 15-Sep-18 15-Sep-18 08-Jan-18 15-Feb-18 15-Feb-18 08-Jan-18 13-Dec-17 13-Dec-17

02-Feb-18 30-Aug-18 30-Aug-18 02-Feb-18 02-Sep-18 02-Sep-18 02-Feb-18 30-Aug-18 30-Aug-18 02-Feb-18 05-Sep-18 05-Sep-18 02-Feb-18 02-Sep-18 02-Sep-18 02-Feb-18 02-Sep-18 02-Sep-18 24-Feb-18 04-Jul-18 04-Jul-18 24-Feb-18 02-Oct-18 02-Oct-18 24-Feb-18 20-Sep-18 20-Sep-18 24-Feb-18 28-May-18 28-May-18

08-Feb-18 03-Sep-18 03-Sep-18 08-Feb-18 02-Sep-18 02-Sep-18 08-Feb-18 02-Sep-18 02-Sep-18 08-Feb-18 04-Dec-18

09-Mar-18 27-Sep-18 27-Sep-18 09-Mar-18 03-Oct-18 03-Oct-18 09-Mar-18 13-Sep-18 13-Sep-18 09-Mar-18 07-Dec-18

12-Mar-18 10-Dec-18

12-Mar-18 10-Dec-18

4.16%

12-Mar-18 10-Dec-18

12-Mar-18 10-Dec-18

0.46%

12-Mar-18 10-Dec-18

12-Mar-18 10-Dec-18

3.24%

12-Mar-18 10-Dec-18

12-Mar-18 10-Dec-18

0.46%

08-Feb-18 10-Sep-18 10-Sep-18 08-Feb-18 10-Sep-18 10-Sep-18 02-Mar-18 12-Jul-18 12-Jul-18 02-Mar-18 29-Nov-18

09-Mar-18 01-Nov-18 01-Nov-18 09-Mar-18 29-Nov-18

12-Mar-18 10-Dec-18

12-Mar-18 10-Dec-18

0.92%

12-Mar-18 10-Dec-18

12-Mar-18 10-Dec-18

1.39%

15-Apr-18 02-Aug-18 02-Aug-18 15-Apr-18 16-Dec-18

18-Apr-18 03-Sep-18 03-Sep-18 18-Apr-18 20-Dec-18

18-Apr-18 03-Sep-18 03-Sep-18 18-Apr-18 20-Dec-18

02-Mar-18 25-Sep-18 25-Sep-18 02-Mar-18 31-May-18 31-May-18

15-Apr-18 30-Sep-18 30-Sep-18 15-Apr-18 12-Jul-18 12-Jul-18

18-Apr-18 10-Dec-18

18-Apr-18 10-Dec-18

18-Apr-18 28-Aug-18 28-Aug-18

18-Apr-18 28-Aug-18 28-Aug-18

Piping

2.1 Early Tie-in Valves 3

% Phy. Comp.

Equipment

1.1 Test Separator

2

% Progress

Instrumentation

3.1

ELECTRONIC INSTRUMENTS (PT/TT)

3.2

LEVEL GAUGES (MAGNETIC)

3.3 GAUGES (PG/TG) 3.4

LEVEL GAUGES (GLASS TYPE)

3.5

LEVEL TRANSMITTERS (DISPLACER)

3.6

LEVEL TRANSMITTERS (RADAR)

3.7

RESTRICTION ORIFICE

3.8

SHUTDOWN & BLOWDOWN VALVES

3.9

FLOW TRANSMITTERS

3.10 CONTROL VALVES

Field Instrumentat ion

Control Valve / SD & BD Valve / PRV/ Orifice / Flow Meters

12.16% 3.42%

2.09% 2.09% 2.09% 2.09%

100.00% 100.00% 100.00% 100.00% 85.00% 85.00% 100.00% 100.00% 100.00%

0.00 0.00 (15.00) 0.00 0.00 0.00

100.00% 100.00% 100.00%

0.00 0.00

100.00% 85.00% 85.00% 100.00% 85.00% 85.00% 100.00% 85.00% 85.00% 100.00% 60.00% 60.00% 100.00% 70.00% 70.00% 100.00% 70.00% 70.00% 100.00% 100.00% 100.00% 100.00% 60.00% 60.00% 100.00% 85.00% 85.00% 100.00% 100.00% 100.00%

(15.00) 0.00

Page 83 of 170

(15.00) 0.00 (15.00) 0.00 (40.00) 0.00 (30.00) 0.00 (30.00) 0.00 0.00 0.00 (40.00) 0.00 (15.00) 0.00 0.00 0.00

Procurement Control Register - Equipment Project No. - 3963 "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" As Of : 25-Oct-18 SL. No.

Description

Proc. Category

EXISTING SYSTEM 3.12 MODIFICATIONS (HONEYWELL) EXISTING SYSTEM 3.13 MODIFICATIONS (EMERSON) EXISTING SYSTEM 3.14 MODIFICATIONS (YOKOGAWA)-KHATIYAH EXISTING SYSTEM 3.15 MODIFICATIONS (YOKOGAWA)-JALEHA 4 Electrical 4.1 Junction Box/Lighting Fixture 5

Modification of Existing System, Yokogawa,E merson, Honey well

5.2

Deluge Skids and Fire water Spray Nozzles

5.3

Firefighting & Safety Equipment

Approve Vendor Document (QP)

Received Filled SPIR Inspection cleared & Ex-works Del. & FOB (Mftg.) FAT Complete

Materails received and cleared at site

QP inspected and cleared material at site

All Spare parts received & SPIR completed

Issue MR

5%

10%

15%

30%

40%

60%

70%

85%

90%

100%

WTGE

P F A P F A P F A P F A P F A

15-Jun-17 15-Aug-17 15-Aug-17 29-Jun-17 03-Aug-17 03-Aug-17 29-Jun-17 10-Aug-17 10-Aug-17 29-Jun-17 27-Jul-17 27-Jul-17 29-Jun-17 27-Jul-17 27-Jul-17

15-Jun-17 19-Aug-17 19-Aug-17 29-Jun-17 17-Oct-01 17-Oct-01 29-Jun-17 17-Oct-17 17-Oct-17 29-Jun-17 10-Aug-17 10-Aug-17 29-Jun-17 10-Aug-17 10-Aug-17

23-Aug-17 04-Jan-18 04-Jan-18 06-Sep-17 28-Dec-17 28-Dec-17 06-Sep-17 28-Dec-17 28-Dec-17 06-Sep-17 21-Dec-17 21-Dec-17 06-Sep-17 21-Dec-17 21-Dec-17

11-Oct-17 27-Mar-18 27-Mar-18 25-Oct-17 17-May-18 17-May-18 25-Oct-17 17-May-18 17-May-18 25-Oct-17 21-Dec-17 21-Dec-17 25-Oct-17 28-Jun-18 28-Jun-18

08-Jan-18 19-Mar-18 19-Mar-18 22-Jan-18 08-Feb-18 08-Feb-18 22-Jan-18 10-May-18 10-May-18 22-Jan-18 21-Dec-17 21-Dec-17 22-Jan-18 10-May-18 10-May-18

24-Feb-18 28-Jun-18 28-Jun-18 27-Mar-18 19-Jul-18 19-Jul-18 27-Mar-18 07-Jun-18 07-Jun-18 27-Mar-18 28-Dec-17 28-Dec-17 27-Mar-18 05-Sep-18 05-Sep-18

02-Mar-18 05-Jul-18 05-Jul-18 02-Apr-18 19-Jul-18 19-Jul-18 02-Apr-18 12-Jul-18 12-Jul-18 02-Apr-18 04-Jan-18 04-Jan-18 02-Apr-18 05-Sep-18 05-Sep-18

15-Apr-18 15-Sep-18 15-Sep-18 01-May-18 19-Jul-18 19-Jul-18 01-May-18 27-Sep-18 27-Sep-18 01-May-18 11-Jan-18 11-Jan-18 01-May-18 27-Sep-18 27-Sep-18

18-Apr-18 10-Dec-18

18-Apr-18 10-Dec-18

2.09%

04-May-18 19-Jul-18 19-Jul-18 04-May-18 10-Dec-18

04-May-18 19-Jul-18 19-Jul-18 04-May-18 10-Dec-18

04-May-18 18-Jan-18 18-Jan-18 04-May-18 10-Dec-18

04-May-18 18-Jan-18 18-Jan-18 04-May-18 10-Dec-18

P F A

10-Jul-17 30-Jul-17 30-Jul-17

10-Jul-17 14-Aug-17 14-Aug-17

18-Sep-17 06-Mar-18 06-Mar-18

06-Nov-17 07-May-18 07-May-18

20-Nov-17 10-May-18 10-May-18

09-Dec-17 31-May-18 31-May-18

15-Dec-17 18-Jul-18 18-Jul-18

13-Jan-18 26-Aug-18 26-Aug-18

16-Jan-18 30-Sep-18 30-Sep-18

16-Jan-18 30-Sep-18 30-Sep-18

P F A P F A P F A

11-Jul-17 23-Jul-17 23-Jul-17 20-Jul-17 25-Jul-17 25-Jul-17 20-Jul-17 25-Jul-17 25-Jul-17

11-Jul-17 03-Aug-17 03-Aug-17 20-Jul-17 03-Aug-17 03-Aug-17 20-Jul-17 03-Aug-17 03-Aug-17

23-Sep-17 25-Jan-18 25-Jan-18 28-Sep-17 22-Feb-18 22-Feb-18 28-Sep-17 01-Mar-18 01-Mar-18

11-Nov-17 30-Apr-18 30-Apr-18 16-Nov-17 17-May-18 17-May-18 16-Nov-17 28-Jun-18 28-Jun-18

25-Dec-17 10-May-18 10-May-18 30-Dec-17 24-May-18 24-May-18 30-Dec-17 17-May-18 17-May-18

24-Feb-18 30-Aug-18 30-Aug-18 02-Apr-18 02-Oct-18 02-Oct-18 13-Feb-18 13-Sep-18 13-Sep-18

02-Mar-18 30-Aug-18 30-Aug-18 08-Apr-18 03-Jan-19

31-Mar-18 30-Sep-18 30-Sep-18 07-May-18 15-Jan-19

03-Apr-18 10-Dec-18

03-Apr-18 10-Dec-18

3.22%

10-May-18 31-Jan-19

10-May-18 31-Jan-19

10.86%

19-Feb-18 15-Sep-18 15-Sep-18

20-Mar-18 30-Sep-18 30-Sep-18

23-Mar-18 27-Dec-18

23-Mar-18 27-Dec-18

1.40%

Loss Preventation

5.1 Fire Detection System

Issue Purchase Order

Sec.

Progress Scale

3.11 PRESSURE RELIEF VALVES

Issue RFQ to Vendors

% Weight

4.00% 8.00% 6.00%

2.00%

0.68%

% Progress % Phy. Comp.

% Variance

100.00% 85.00% 85.00% 100.00% 100.00% 100.00% 100.00% 85.00% 85.00% 100.00% 100.00% 100.00% 100.00% 85.00% 85.00%

(15.00) 0.00

100.00% 100.00% 100.00%

0.00 0.00

100.00% 85.00% 85.00% 100.00% 60.00% 60.00% 100.00% 85.00% 85.00%

(15.00) 0.00

Page 84 of 170

0.00 0.00 (15.00) 0.00 0.00 0.00 (15.00) 0.00

(40.00) 0.00 (15.00) 0.00

PROJECT PLANNING PACKAGE

Attachment 9

CONSTRUCTION CONTROL REGISTER

Page 85 of 170

Attachment-6 Construction CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORSTLL DEGASSING STATIONS, DUKHAN CONSTRUCTION PROGRESS (MONITORING WEIGHTAGE):

Sr.no. Activity ID XX

1

2

3

4 5 6

9 10 12 13 14

17

18

19

Inv  Code

Activity Name

FABRICATION KAHM Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR.  F0010 2.40 INCL.LADDERS/STAIRS/HR/WW/CROS   TRANSFER TO SITE FOR INSTLN. FAB. OF  METERING SKID  F0040 2.40 INCL.LADDERS/STAIRS/HR/WW/CROS  TRANSFER TO SITE FOR INSTALLATION FAB. OF PSV  INCL.LADDERS/STAIRS/HR/WW/CROS.  F0030 2.40 STRUCTURE  TRANSFER TO SITE FOR  INSTALLATION FAB. OF PIPESUPPORT  STRUCTURE  SHIFT  F0020 XX 2.40 TO SITE FAB. OF PIPESUPPORT  STRUCTURE  SHIFT  F0020 XX 2.40 TO SITE FABRICATION OF INSTRUMENT STANCHION  F0020‐1 2.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION  & FBE COATINGT  F0080 2.10 KUWAIT F0110 2.10 FBE PIPING BULK DELIVERT SITE REMANING PIPING (NON FBE) ETPFKM‐1 2.10 Early Tie‐in Fabrication Works COMPLETE PIPING FABRICATION   INCL.  F0080‐1 2.10 HYDROTEST/ PAINTING & COATING F0110‐1 2.10 FABRICATION SPOOLS DELIVER TO SITE KAHN Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR.  F110 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS  TRANSFER TO SITE FOR INSTLN. FAB. OF  METERING SKID  F140 XX 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS.   TRANSFER TO SITE FOR INSTALLATION FAB. OF  METERING SKID  F140 XX 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS.   TRANSFER TO SITE FOR INSTALLATION

LAST WEEK

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Current Week

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Cumulative

Plan % (Rev : 04)

Actual %

Variance

21.00%

100.00%

0.04%

0.21%

100.000%

95.00%

0.00%

3.000%

65.789%

98.000%

32.21%

FAB

KM

STFB

Kg

9298

9112.04

06‐Sep‐18

20‐Nov‐18

6‐Sep‐18

FAB

KM

STFB

Kg

4078

4078

08‐Aug‐18

15‐Oct‐18

8‐Aug‐18

15‐Oct‐18

0.04%

0.21%

100.000%

95.00%

0.00%

5.000%

100.000%

100.000%

0.00%

FAB

KM

STFB

Kg

1705

1705

09‐Aug‐18

23‐Oct‐18

15‐Jul‐18

23‐Oct‐18

0.04%

0.21%

100.000%

98.00%

0.00%

0.000%

100.000%

100.000%

0.00%

FAB

KM

STFB

Sqm

5780

5780

07‐Jun‐18

12‐Nov‐18

4‐Feb‐18

19‐Jul‐18

0.02%

0.11%

100.000%

100.00%

0.00%

0.000%

88.679%

100.000%

11.32%

FAB

KM

STFB

Sqm

1320

1280.4

07‐Jun‐18

12‐Nov‐18

7‐Jun‐18

0.04%

0.21%

100.000%

97.00%

0.00%

0.000%

88.679%

97.000%

8.32%

FAB

KM

STFB

0

13‐Aug‐18

03‐Sep‐18

20‐Jun‐18

0.04%

0.21%

100.000%

100.00%

0.00%

0.000%

100.000%

100.000%

0.00%

08‐Oct‐18

0.17%

0.80%

74.074%

12.00%

‐45.95%

8.000%

28.125%

20.000%

‐8.13%

0.06%

0.27%

0.000%

0.00%

0.00%

0.000%

0.000%

0.000%

0.00%

FAB

KM

PPFB

DIN

2677

535.4

08‐Oct‐18

10‐Dec‐18

FAB

KM

PPFB

LM

110

0

05‐Dec‐18

15‐Dec‐18

FAB

KM

PPFB

0

19‐Dec‐17

18‐Jan‐18

19‐Dec‐17

FAB

KM

PPFB

0

24‐Oct‐18

08‐Dec‐18

24‐Oct‐18

FAB

KM

PPFB

0

28‐Nov‐18

12‐Dec‐18

FAB

KN

STFB

Kg

8368.2

19‐Sep‐18

13‐Nov‐18

19‐Sep‐18

FAB

KN

STFB

Kg

4909.18 4909.175

28‐May‐18

16‐Aug‐18

28‐May‐18

FAB

KN

STFB

Kg

866.325

866.325

28‐May‐18

16‐Aug‐18

9298

27‐Jul‐18

100.00%

0.00%

0.0%

100.000%

0.22%

1.07%

91.892%

5.00%

‐87.54%

0.000%

4.348%

5.000%

0.65%

0.11%

0.53%

50.000%

0.00%

‐50.00%

0.000%

0.000%

0.000%

0.00%

0.04%

0.21%

100.000%

75.00%

0.00%

15.000%

66.071%

90.000%

23.93%

19‐Jul‐18

0.02%

0.08%

100.000%

100.00%

0.00%

0.000%

100.000%

100.000%

0.00%

28‐May‐18

20‐Aug‐18

0.04%

0.21%

100.000%

100.00%

0.00%

0.000%

100.000%

100.000%

0.00%

18‐Jan‐18

0.05%

0.23%

100.000%

100.00%

0.00%

20

F130

XX

FAB. OF PSV  1.40 INCL.LADDERS/STAIRS/HR/WW/CROS.  STRUCTURE  TO SITE FOR INSTALLATION

FAB

KN

STFB

Kg

6570.5

6570.5

17‐May‐18

21‐Aug‐18

17‐May‐18

19‐Jul‐18

0.02%

0.08%

100.000%

100.00%

0.00%

0.000%

100.000%

100.000%

0.00%

21

F130

XX

FAB. OF PSV  1.40 INCL.LADDERS/STAIRS/HR/WW/CROS.  STRUCTURE  TO SITE FOR INSTALLATION

FAB

KN

STFB

Kg

1159.5

1159.5

17‐May‐18

21‐Aug‐18

17‐May‐18

26‐Aug‐18

0.04%

0.21%

100.000%

100.00%

0.00%

0.000%

100.000%

100.000%

0.00%

FAB

KN

STFB

Kg

7140

7140

9‐May‐18

13‐Nov‐18

5‐Feb‐18

19‐Jul‐18

0.02%

0.08%

100.000%

100.00%

0.00%

0.000%

89.947%

100.000%

10.05%

FAB

KN

STFB

Kg

1660

1643.4

09‐May‐18

13‐Nov‐18

9‐May‐18

0.04%

0.21%

100.000%

98.00%

0.00%

1.000%

89.947%

99.000%

9.05%

FAB

KN

STFB

0

15‐Aug‐18

16‐Sep‐18

26‐Jun‐18

0.04%

0.21%

100.000%

100.00%

0.00%

0.000%

100.000%

100.000%

0.00%

08‐Oct‐18

0.21%

0.99%

74.074%

12.00%

‐42.50%

8.000%

31.579%

20.000%

‐11.58%

0.07%

0.33%

0.000%

0.00%

0.000%

0.000%

0.06%

0.29%

100.000%

100.00%

0.00%

0.000%

100.000%

100.000%

0.00%

0.28%

1.31%

91.892%

5.00%

‐91.89%

0.000%

0.000%

5.000%

5.00%

0.14%

0.66%

50.000%

‐50.00%

0.000%

0.000%

0.01%

0.05%

100.000%

0.00%

0.000%

100.000%

22

23

24

27 28 30 31 32

35

COMPLETE  FAB. OF PIPESUPPORT   1.40 STRUCTURE  TRANSFER TO SITE FOR  INSTALLATION COMPLETE  FAB. OF PIPESUPPORT   F120 XX 1.40 STRUCTURE  TRANSFER TO SITE FOR  INSTALLATION FABRICATION OF INSTRUMENT STANCHION  F120‐1 1.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION  & FBE COATINGT  F180 1.10 KUWAIT F210 1.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING ( NON FBE) ETPFKN‐1 1.10 Early Tie‐in Fabrication Works COMPLETE PIPING FABRICATION .  F180‐1 1.10 HYDROTEST/ PAINTING & COATING F210‐1 1.10 FABRICATION SPOOLS DELIVER TO SITE KAHS Structural Steel Fabrication FAB. OF  METERING SKID  F250 XX 3.40 INCL.LADDERS/STAIRS/HR/WW/CROS.   TRANSFER TO SITE FOR INSTALLATION F120

XX

FAB

KN

PPFB

DIN

3118

623.6

08‐Oct‐18

03‐Dec‐18

FAB

KN

PPFB

LM

147

0

01‐Dec‐18

15‐Dec‐18

FAB

KN

PPFB

0

19‐Dec‐17

19‐Jan‐18

19‐Dec‐17

FAB

KN

PPFB

0

27‐Oct‐18

03‐Dec‐18

27‐Oct‐18

FAB

KN

PPFB

0

24‐Nov‐18

08‐Dec‐18

FAB

KS

STFB

4594.25

19‐Jun‐18

26‐Aug‐18

Kg

4594.25

19‐Jun‐18

26‐Jul‐18

19‐Jan‐18

19‐Jul‐18

100.00%

0.00%

0.00%

100.000%

Page 86 of 170

0.00%

Sr.no. Activity ID XX

Inv  Code

36

F250

XX

3.40

37

F230

XX

3.40

38

F230

XX

3.40

39

F220

3.40

40

F240

3.40

41

F260‐1

3.40

44 45 47 48 49

52

53

54

55 56

59 60

62 63

66

67

68

69

70

73 74

Activity Name FAB. OF  METERING SKID  INCL.LADDERS/STAIRS/HR/WW/CROS.   TRANSFER TO SITE FOR INSTALLATION FAB. OF PIPESUPPORT  STRUCTURE   TRANSFER TO SITE FOR INSTALLATION FAB. OF PIPESUPPORT  STRUCTURE   TRANSFER TO SITE FOR INSTALLATION FAB. OF SEPERATOR & PLATFORM STR.  INCL.LADDERS/STAIRS/HR/WW/CROS.  TRANSFER TO SITE FOR INSTLN. FAB. OF PSV  INCL.LADDERS/STAIRS/HR/WW/CROS.  STRUCTURE   TRANSFER TO SITE FOR  INSTALLATION FABRICATION OF INSTRUMENT STANCHION  SUPPORTS

Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION  & FBE COATINGT  F290 3.10 KUWAIT F320‐2 3.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING (NON ‐ FBE) SDCN100 3.10 Early Tie‐in Fabrication Works COMPLETE PIPING FABRICATION INCL.  F290‐1 3.10 HYDROTEST/ PAINTING & COATING F320‐1 3.10 FABRICATION SPOOLS DELIVER TO SITE JALM Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR.  F330 7.40 INCL.LADDERS/STAIRS/HR/WW/CROS.   TRANSFER TO SITE FOR INSTLN. FAB. OF METERING SKID  F340 7.40 INCL.LADDERS/STAIRS/HR/WW/CROS.  TRANSFER TO SITE FOR INSTALLATION FAB. OF PSV  INCL.LADDERS/STAIRS/HR/WW/CROS.  F350 7.40 STRUCTURE  TRANSFER TO SITE FOR  INSTALLATION FAB. OF PIPESUPPORT  STRUCTURE   F360 7.40 TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION  F370 7.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION  & FBE COATINGT  F400 7.10 KUWAIT F430 7.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING (NON FBE0 COMPLETE PIPING FABRICATION  F400‐1 7.10 HYDROTEST/ PAINTING & COATING F430‐1 7.10 FABRICATION SPOOLS DELIVER TO SITE FAHS Structural Steel Fabrication COMPLETE  FAB. OF SEPERATOR &  PLATFORM STR.  F440 6.40 INCL.LADDERS/STAIRS/HR/WW/CROS. BY  PETROSERV & TRANSFER TO SITE FOR  INSTLN. COMPLETE SS FAB. OF  METERING SKID  INCL.LADDERS/STAIRS/HR/WW/CROS. BY  F450 6.40 PETROSERV & TRANSFER TO SITE FOR  INSTALLATION COMPLETE  FAB. OF PSV  INCL.LADDERS/STAIRS/HR/WW/CROS.  F460 6.40 STRUCTURE  BY PETROSERV & TRANSFER TO  SITE FOR INSTALLATION COMPLETE  FAB. OF PIPESUPPORT   F470 6.40 STRUCTURE  BY PETROSERV & TRANSFER TO  SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION  F480 6.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION  & FBE COATINGT  F510 6.10 KUWAIT F540 6.10 FBE PIPING BULK DELIVERT SITE REMANING PIPING (NON FBE)

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

26‐Aug‐18

20‐Jun‐18

26‐Aug‐18

0.04%

0.20%

100.000%

100.00%

19‐Jul‐18

Actual %

Variance

100.000%

100.000%

0.00%

FAB

KS

STFB

Kg

810.75

810.75

19‐Jun‐18

FAB

KS

STFB

Kg

1620

1620

06‐Feb‐18

10‐Nov‐18

6‐Feb‐18

0.01%

0.05%

100.000%

100.00%

0.00%

0.000%

94.245%

100.000%

5.76%

FAB

KS

STFB

Kg

850

833

6‐Feb‐18

10‐Nov‐18

7‐Apr‐18

0.04%

0.20%

100.000%

98.00%

0.00%

98.000%

94.245%

98.000%

3.76%

FAB

KS

STFB

Kg

9298

8833.1

16‐Aug‐18

05‐Nov‐18

25‐Aug‐18

0.04%

0.20%

100.000%

92.00%

0.00%

95.000%

86.585%

95.000%

8.41%

FAB

KS

STFB

Kg

1705

1619.75

06‐Feb‐18

05‐Nov‐18

10‐Jul‐18

0.04%

0.20%

100.000%

92.00%

0.00%

95.000%

95.971%

95.000%

‐0.97%

FAB

KS

STFB

0

02‐Sep‐18

16‐Sep‐18

26‐Jun‐18

0.04%

0.20%

100.000%

100.00%

0.00%

100.000%

100.000%

100.000%

0.00%

08‐Oct‐18

0.20%

0.93%

58.621%

12.00%

‐27.04%

8.000%

31.579%

20.000%

‐11.58%

0.07%

0.31%

0.000%

0.00%

0.000%

0.000%

0.06%

0.27%

100.000%

100.00%

0.00%

0.000%

0.26%

1.24%

91.892%

5.00%

‐88.67%

0.000%

0.13%

0.62%

62.500%

‐62.50%

0.000%

0.000%

DIN

2945

26‐Jul‐18

0.00%

0.000%

Plan % (Rev : 04)

FAB

KS

PPFB

589

08‐Oct‐18

03‐Dec‐18

FAB

KS

PPFB

0

04‐Dec‐18

13‐Dec‐18

FAB

KS

PPFB

0

19‐Dec‐17

18‐Jan‐18

19‐Dec‐17

FAB

KS

PPFB

0

25‐Oct‐18

24‐Nov‐18

25‐Oct‐18

FAB

KS

PPFB

0

18‐Nov‐18

02‐Dec‐18

FAB

JL

STFB

Kg

9298

5578.8

11‐Sep‐18

22‐Dec‐18

11‐Sep‐18

0.09%

0.41%

100.000%

50.00%

‐56.31%

10.000%

43.689%

60.000%

16.31%

FAB

JL

STFB

Kg

2470

2173.6

11‐Sep‐18

22‐Dec‐18

11‐Sep‐18

0.01%

0.03%

100.000%

85.00%

‐56.31%

3.000%

43.689%

88.000%

44.31%

FAB

JL

STFB

Kg

1705

545.6

12‐Sep‐18

22‐Dec‐18

12‐Sep‐18

0.01%

0.06%

100.000%

25.00%

‐56.86%

7.000%

43.137%

32.000%

‐11.14%

FAB

JL

STFB

Kg

4078

1835.1

20‐Sep‐18

31‐Dec‐18

12‐Sep‐18

0.01%

0.06%

79.070%

35.00%

‐44.12%

10.000%

34.951%

45.000%

10.05%

FAB

JL

STFB

PCS

151

151

02‐Sep‐18

16‐Sep‐18

26‐Jun‐18

0.14%

0.67%

0.000%

100.00%

100.00%

0.000%

100.000%

100.000%

0.00%

11‐Oct‐18

12.00%

20.000%

‐0.55%

18‐Jan‐18

26‐Jul‐18

0.00%

100.000%

100.000%

0.00%

3.226%

5.000%

1.77%

FAB

JL

PPFB

DIN

3564

712.8

11‐Oct‐18

22‐Dec‐18

0.24%

1.14%

48.780%

‐28.23%

8.000%

20.548%

FAB

JL

PPFB

LM

170

0

23‐Dec‐18

01‐Jan‐19

0.08%

0.38%

0.000%

0.00%

0.000%

0.000%

0.00%

0.00%

FAB

JL

PPFB

0

28‐Nov‐18

05‐Jan‐19

0.32%

1.51%

65.789%

‐65.79%

5.000%

0.000%

FAB

JL

PPFB

0

26‐Dec‐18

09‐Jan‐19

0.16%

0.76%

0.000%

0.00%

0.000%

0.000%

FAB

FS

STFB

Kg

9298

6043.7

11‐Sep‐18

29‐Dec‐18

11‐Sep‐18

0.10%

0.48%

89.474%

60.00%

‐48.56%

5.000%

40.909%

65.000%

24.09%

FAB

FS

STFB

Kg

2470

2223

09‐Sep‐18

29‐Dec‐18

9‐Sep‐18

0.01%

0.05%

89.474%

85.00%

‐47.51%

5.000%

41.964%

90.000%

48.04%

FAB

FS

STFB

Kg

1705

818.4

11‐Sep‐18

10‐Dec‐18

11‐Sep‐18

0.02%

0.10%

100.000%

40.00%

‐50.55%

8.000%

49.451%

48.000%

‐1.45%

FAB

FS

STFB

Kg

4078

2039

12‐Sep‐18

19‐Dec‐18

12‐Sep‐18

0.02%

0.10%

86.207%

45.00%

‐41.76%

5.000%

44.444%

50.000%

5.56%

FAB

FS

STFB

PCS

151

151

03‐Sep‐18

16‐Sep‐18

26‐Jun‐18

0.12%

0.55%

45.000%

100.00%

55.00%

0.000%

100.000%

100.000%

0.00%

18‐Oct‐18

0.18%

0.88%

48.780%

12.00%

‐35.45%

8.000%

13.333%

20.000%

6.67%

0.06%

0.29%

0.000%

0.00%

0.000%

0.000%

FAB

FS

PPFB

DIN

2678

535.6

18‐Oct‐18

16‐Dec‐18

FAB

FS

PPFB

LM

142

0

17‐Dec‐18

25‐Dec‐18

27‐Jul‐18

5.000%

5.00% 0.00%

Page 87 of 170

0.00%

Sr.no. Activity ID XX 76

F510‐1

77

F540‐1

Inv  Code

Activity Name

COMPLETE PIPING FABRICATION  INCL.  HYDROTEST/ PAINTING & COATING 6.10 FABRICATION SPOOLS DELIVER TO SITE 6.10

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

5.000%

5.00%

FAB

FS

PPFB

0

05‐Nov‐18

12‐Dec‐18

0.25%

1.17%

65.789%

‐65.79%

5.000%

0.000%

FAB

FS

PPFB

0

04‐Dec‐18

22‐Dec‐18

0.12%

0.59%

10.000%

‐10.00%

0.000%

0.000%

FAB

FN

STFB

Kg

9298

5578.8

10‐Sep‐18

02‐Jan‐19

10‐Sep‐18

0.12%

0.58%

89.474%

50.00%

‐49.47%

10.000%

40.000%

60.000%

20.00%

FAB

FN

STFB

Kg

2470

2223

12‐Sep‐18

02‐Jan‐19

12‐Sep‐18

0.01%

0.06%

89.474%

85.00%

‐50.54%

5.000%

38.938%

90.000%

51.06%

FAB

FN

STFB

Kg

1705

1193.5

11‐Sep‐18

19‐Dec‐18

11‐Sep‐18

0.02%

0.12%

89.474%

50.00%

‐44.47%

20.000%

45.000%

70.000%

25.00%

FAB

FN

STFB

Kg

4078

2120.56

11‐Sep‐18

02‐Jan‐19

11‐Sep‐18

0.02%

0.12%

89.474%

48.00%

‐50.00%

4.000%

39.474%

52.000%

12.53%

FAB

FN

STFB

PCS

151

151

03‐Sep‐18

11‐Oct‐18

26‐Jul‐18

0.11%

0.53%

45.000%

100.00%

55.00%

0.000%

100.000%

100.000%

0.00%

14‐Oct‐18

12.00%

20.00%

0.00%

112

FAHN Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR.  F550 4.40 INCL.LADDERS/STAIRS/HR/WW/CROS  TRANSFER TO SITE FOR INSTLN. FAB OF METERING SKID  F560 4.40 INCL.LADDERS/STAIRS/HR/WW/CROS.   TRANSFER TO SITE FOR INSTALLATION FAB OF PSV  INCL.LADDERS/STAIRS/HR/WW/CROS.  F570 4.40 STRUCTURE  TRANSFER TO SITE FOR  INSTALLATION FAB. OF PIPESUPPORT  STRUCTURE   F580 4.40 TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION  F590 4.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION  & FBE COATINGT  F620 4.10 KUWAIT F650 4.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING (NON FBE) COMPLETE PIPING FABRICATION   INCL.  F620‐1 4.10 HYDROTEST/ PAINTING & COATING F650‐1 4.10 FABRICATION SPOOLS DELIVER TO SITE FAHM Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR.  F660 5.40 INCL.LADDERS/STAIRS/HR/WW/CROS.  TRANSFER TO SITE FOR INSTLN. FAB. OF  METERING SKID  F670 5.40 INCL.LADDERS/STAIRS/HR/WW/CROS  TRANSFER TO SITE FOR INSTALLATION FAB.OF PSV  INCL.LADDERS/STAIRS/HR/WW/CROS.  F680 5.40 STRUCTURE  TRANSFER TO SITE FOR  INSTALLATION FAB. OF PIPESUPPORT  STRUCTURE   F690 5.40 TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION  F700 5.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION  & FBE COATINGT  F730 5.10 KUWAIT F760 5.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING (NON FBE) COMPLETE PIPING FABRICATION   INCL.  F730‐1 5.10 HYDROTEST/ PAINTING & COATING F760‐1 5.10 FABRICATION SPOOLS DELIVER TO SITE INSTALLATION KAHN Civil Works COMMOMN A1440 1.40 GRADING CABLE TRENCHESND UTILITY ROAD  A1510 1.40 CROSSINGS A1520 1.40 DRAINAGE PIPE CULVERTS

INS

KN

CV

LM

33

33

30‐Sep‐18

16‐Oct‐18

113

A1530

1.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS

KN

CV

PCS

1

0

02‐Jan‐19

16‐Jan‐19

114

A1500

1.40

INS

KN

CV

SQM

231

0

02‐Jan‐19

16‐Jan‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

115

A1440‐1

1.40 PROTECTION OF UNDERGROUND CABLES

INS

KN

CV

0

05‐Sep‐18

21‐Nov‐18

05‐Sep‐18

0.01%

0.04%

100.000%

90.00%

‐34.62%

0.00%

65.38%

90.00%

24.62%

116

A1445‐6

1.40

SOAKWAY PIT EXCAVATION & INSTALLATION  INS INCL. DEMOLITION ‐  IFPPLICABLE

KN

CV

0

14‐Aug‐18

17‐Nov‐18

14‐Aug‐18

0.01%

0.04%

100.000%

90.00%

‐23.96%

0.00%

76.04%

90.00%

13.96%

A1530‐1

RE‐INSTATEMENT OF EXISTING PAVEMENT  1.40 (INTERLOCK PAVING)

INS

KN

CV

0

02‐Jan‐19

16‐Jan‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

80

81

82

83 84

87 88

90 91

94

95

96

97 98

101 102

104 105

110 111

117

ROADSND PAVING(INCLUDING  MODIFICATIONS)

FAB

FN

PPFB

DIN

2522

504.4

14‐Oct‐18

25‐Dec‐18

0.18%

0.86%

48.780%

‐32.34%

8.00%

16.44%

FAB

FN

PPFB

LM

164

0

26‐Dec‐18

05‐Jan‐19

0.06%

0.29%

0.000%

0.00%

0.00%

0.00%

3.56% 0.00%

FAB

FN

PPFB

0

19‐Nov‐18

26‐Dec‐18

0.24%

1.15%

65.789%

‐65.79%

5.00%

0.00%

FAB

FN

PPFB

0

16‐Dec‐18

03‐Jan‐19

0.12%

0.58%

0.000%

0.00%

0.00%

0.00%

FAB

FM

STFB

Kg

9298

4370.06

13‐Sep‐18

24‐Jan‐19

13‐Sep‐18

0.08%

0.39%

71.429%

40.00%

‐39.34%

7.00%

32.09%

47.00%

14.91%

FAB

FM

STFB

Kg

2470

1778.4

13‐Sep‐18

24‐Jan‐19

13‐Sep‐18

0.01%

0.04%

71.429%

30.00%

‐39.34%

42.00%

32.09%

72.00%

39.91%

FAB

FM

STFB

Kg

1705

596.75

13‐Sep‐18

09‐Jan‐19

13‐Sep‐18

0.02%

0.08%

71.429%

30.00%

‐35.29%

5.00%

36.13%

35.00%

‐1.13%

FAB

FM

STFB

Kg

4078

3140.06

12‐Sep‐18

05‐Jan‐19

12‐Sep‐18

0.02%

0.08%

62.500%

75.00%

‐24.57%

2.00%

37.93%

77.00%

39.07%

FAB

FM

STFB

PCS

151

151

03‐Sep‐18

16‐Sep‐18

3‐Sep‐18

0.11%

0.53%

0.000%

100.00%

100.00%

0.00%

100.00%

100.00%

0.00%

FAB

FM

PPFB

DIN

2775

555

18‐Oct‐18

31‐Dec‐18

18‐Oct‐18

0.20%

0.93%

43.478%

12.00%

‐32.81%

8.00%

10.67%

20.00%

FAB

FM

PPFB

LM

146

0

01‐Jan‐19

10‐Jan‐19

0.07%

0.31%

0.000%

0.00%

0.00%

0.00%

16‐Sep‐18

5.00%

5.00% 0.00%

9.33% 0.00%

FAB

FM

PPFB

0

29‐Nov‐18

14‐Jan‐19

0.26%

1.25%

50.000%

‐50.00%

5.00%

0.00%

FAB

FM

PPFB

0

29‐Dec‐18

16‐Jan‐19

0.13%

0.62%

0.000%

0.00%

0.00%

0.00%

0.04%

0.18%

100.000%

100.00%

0.00%

0.00%

100.00%

100.00%

0.00%

0.00%

0.01%

100.000%

25.00%

‐30.34%

10.00%

69.66%

35.00%

‐34.66%

0.01%

0.02%

0.000%

100.00%

100.00%

0.00%

100.00%

100.00%

0.00%

0.00%

0.00%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KN

CV

SQM

246

246

10‐Feb‐18

31‐May‐18

09‐Feb‐18

INS

KN

CV

LM

500

175

25‐Aug‐18

21‐Nov‐18

25‐Aug‐18 30‐Sep‐18

19‐Jul‐18

16‐Oct‐18

5.00%

5.00% 0.00%

TEST SEPERATOR 119

A1445

1.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

KN

CV

CUM

40

40

09-Feb-18

29-Mar-18

09-Feb-18

29-Mar-18

0.02%

0.09%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

120 121

A1450 A1450‐1

1.40 FOUNDATION WORK  (STEEL FIXING) 1.40 FOUNDATION WORK  (CONCRETE)

KN KN

CV CV

ton CUM

1534 15.8

1534 15.8

01-Apr-18 01-Apr-18

12-Apr-18 26-Apr-18

01-Apr-18 01-Apr-18

12-Apr-18 26-Apr-18

0.02% 0.02%

0.07% 0.07%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

INS INS

Page 88 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

122

A1450‐2

XX 1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

CUM

45

45

24-May-18

11-Aug-18

27-May-18

19-Jul-18

0.02%

0.07%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

123

A1450‐2

XX 1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

CUM

45

45

24‐May‐18

11‐Aug‐18

24-May-18

11-Aug-18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

TEST SEPERATOR PLATFORM 125

A1445‐1

1.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

KN

CV

0

09‐Feb‐18

29‐Mar‐18

09‐Feb‐18

29‐Mar‐18

0.02%

0.09%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

126 127

A1450‐3 A1450‐4

1.40 FOUNDATION WORK  (STEEL FIXING) 1.40 FOUNDATION WORK  (CONCRETE)

INS INS

KN KN

CV CV

0 0

01‐Apr‐18 01‐Apr‐18

16‐Jul‐18 26‐Jul‐18

01‐Apr‐18 01‐Apr‐18

16‐Jul‐18 26‐Jul‐18

0.02% 0.02%

0.07% 0.07%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

128

A1450‐5

XX 1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

0

27‐May‐18

11-Aug-18

27‐May‐18

19-Jul-18

0.02%

0.07%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

129

A1450‐5

XX 1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

0

27‐May‐18

11‐Aug‐18

27‐May‐18

11‐Aug‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

METERING SKID 131 132 133 134

A1445‐2 A1490 A1490‐1

1.40 EXCAVATION 1.40 FOUNDATION WORK  (STEEL FIXING) 1.40 FOUNDATION WORK  (CONCRETE)

INS INS INS

KN KN KN

CV CV CV

CUM kg CUM

60 1656 14.55

60 1656 14.55

06‐Mar‐18 01‐Apr‐18 01‐Apr‐18

29‐Mar‐18 12‐Apr‐18 26‐Apr‐18

06‐Mar‐18 01‐Apr‐18 01‐Apr‐18

29‐Mar‐18 12‐Apr‐18 26‐Apr‐18

0.04% 0.03% 0.03%

0.19% 0.15% 0.15%

100.000% 100.000% 100.000%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

A1490‐2

1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

CUM

108

108

28‐May‐18

11‐Aug‐18

28‐May‐18

11‐Aug‐18

0.03%

0.15%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS

KN

CV

CUM

78.6

78.6

22‐Mar‐18

06‐Aug‐18

22‐Mar‐18

31‐May‐18

0.04%

0.19%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS

KN

CV

CUM

78.6

78.6

22‐Mar‐18

06‐Aug‐18

22‐Mar‐18

06‐Aug‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

PIPE SUPPORT EXCAVATION FOR STRUCTURAL STEEL PIPE  SUPPORTS EXCAVATION FOR STRUCTURAL STEEL PIPE  SUPPORTS FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE) FOUNDATION WORK  (CONCRETE)

136

A1445‐3

XX 1.40

137

A1445‐3

XX 1.40

138 139 140 141

A1470 A1470 A1470‐1 A1470‐1

XX XX XX XX

INS INS INS INS

KN KN KN KN

CV CV CV CV

kg kg CUM CUM

2880 2880 24 24

2880 2880 24 24

10‐Dec‐17 10‐Dec‐17 10‐Dec‐17 10‐Dec‐17

18‐Aug‐18 18‐Aug‐18 18‐Aug‐18 18‐Aug‐18

10‐Dec‐17 10‐Dec‐17 10‐Dec‐17 10‐Dec‐17

19‐Jul‐18 18‐Aug‐18 19‐Jul‐18 18‐Aug‐18

0.00% 0.00% 0.00% 0.00%

0.01% 0.00% 0.01% 0.00%

100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

142

A1470‐2

XX 1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

CUM

76

76

10‐Dec‐17

23‐Aug‐18

10‐Dec‐17

19‐Jul‐18

0.00%

0.01%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

143

A1470‐2

XX 1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

CUM

76

76

10‐Dec‐17

23‐Aug‐18

10‐Dec‐17

23‐Aug‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS

KN

CV

CUM

100

100

24‐Mar‐18

05‐Jul‐18

24‐Mar‐18

05‐Jul‐18

0.04%

0.19%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS INS

KN KN

CV CV

CUM CUM

3647 26

3647 26

15‐Apr‐18 22‐Apr‐18

08‐Aug‐18 08‐Aug‐18

15‐Apr‐18 22‐Apr‐18

08‐Aug‐18 08‐Aug‐18

0.00% 0.00%

0.00% 0.00%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

1.40 1.40 1.40 1.40

PSV EXCAVATION (INCLUDINGREA LIGHTING  POLES) 1.40 FOUNDATION WORK  (STEEL FIXING) 1.40 FOUNDATION WORK  (CONCRETE) 1.40

145

A1445‐4

146 147

A1490‐3 A1490‐5

148

A1490‐6

XX 1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

CUM

206

206

04‐Jun‐18

11‐Aug‐18

04‐Jun‐18

19‐Jul‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

149

A1490‐6

XX 1.40 CURING / WATERPROOFING / BACK FILLING INS

KN

CV

CUM

206

206

04‐Jun‐18

11‐Aug‐18

04‐Jun‐18

11‐Aug‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

KN

STIN

Kg

9298

1394.7

02‐Oct‐18

03‐Dec‐18

02‐Oct‐18

0.09%

0.44%

100.000%

10.00%

‐61.90%

5.00%

38.10%

15.00%

‐23.10%

INS

KN

STIN

PCS

151

0

14‐Nov‐18

03‐Dec‐18

0.01%

0.04%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL OF  1.40 METERING SKID INCL. WALK WAY OR CROSS  INS OVER

KN

STIN

0

04‐Oct‐18

06‐Dec‐18

04‐Oct‐18

0.02%

0.08%

100.000%

10.00%

‐65.63%

5.00%

34.38%

15.00%

‐19.38%

Structural Steel TEST SEPERATOR 152

A2360

INSTALLATION OF STRUCTURAL STEELWORK  1.40 OPERATINGNDCCESS PLATFORMS (TEST  INS SEPERATOR & PLATFORM)

153

A2400

1.40

INSTALLATION OF LADDERS, STAIRS,  HANDRAILS

METERING SKID 155

A2360‐1

30‐Oct‐18

PSV 157

A2380

INSTALLATION OF PSV VALVESCCESS  PLATFORMS

INS

KN

STIN

Kg

1705

255.75

10‐Oct‐18

06‐Dec‐18

10‐Oct‐18

0.01%

0.04%

100.000%

10.00%

‐72.41%

5.00%

27.59%

15.00%

‐12.59%

INSTALLATION OF STRUCTURAL STEEL PIPE  1.40 SUPPORTS & MODIFICATIONS OF  EXISTINGCCESS PLATFORMS (IFPPLICABLE)

INS

KN

STIN

Kg

2470

247

11‐Oct‐18

18‐Dec‐18

11‐Oct‐18

0.00%

0.02%

100.000%

0.00%

‐78.26%

10.00%

21.74%

10.00%

‐11.74%

1.40 INSTALLATION OF INSTRUMENT STANCHION INS

KN

STIN

0

15‐Dec‐18

18‐Dec‐18

0.00%

0.02%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

1.10 INSTALLATION OF NEW TEST SEPARATOR

KN

ME

KN

PPIN

KN

1.40

PIPE SUPPORT 159

A2370

FIELD INSTRUMENT 161

A2370‐1

Mechanical 163

166 167 168 169

171

A2775

INS

Piping EARLY SHUTDOWN WORKS ‐ Pre Shutdownnd Plant Shutdown Tie‐in A5550 1.10 MOBILIZATION OF OF TEAMPPLY PTW INS SCAFFOLDING / PLATE FORM / WORK  A5560 INS 1.10 PERMIT ISSUE A5570 1.10 PIPING TIE‐IN / NDT INS A5580 1.10 TIE‐IN COMPLETE / REMOVE SCAFFOLD INS PIPING ‐REMAINING A2920

1.10

PIPING INSTALLATION ON PIPE  SUPPORT,PIERACK &ROUND EQUIPMENT

INS

SET

137.5

137.5

05‐Sep‐18

06‐Sep‐18

04‐Sep‐18

06‐Sep‐18

0.02%

0.10%

100.000%

100.00%

0.00%

0.00%

100.00%

100.00%

0.00%

0

31‐Dec‐17

31‐Dec‐17

31‐Dec‐17

31‐Dec‐17

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

PPIN

PCS

150

150

31‐Dec‐17

05‐Jan‐18

31‐Dec‐17

05‐Jan‐18

0.02%

0.11%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

KN KN

PPIN PPIN

DIN PCS

90 15

90 15

09‐Feb‐18 06‐Feb‐18

14‐Feb‐18 17‐Feb‐18

09‐Feb‐18 06‐Feb‐18

14‐Feb‐18 17‐Feb‐18

0.01% 0.00%

0.07% 0.01%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

KN

PPIN

DIN

334.728

0

10‐Dec‐18

29‐Dec‐18

0.03%

0.12%

20.690%

0.00%

‐20.69%

0.00%

0.00%

0.00%

0.00%

Page 89 of 170

Sr.no. Activity ID XX 172

A2920‐1

Inv  Code

Activity Name

3963‐ PHASE

1.10 INSTALLATION OF BALL VALVE & GGC VALVE INS

173

A2940

1.10

174

A2950

1.10

175

A2930

1.10

176

A2951

1.10

HYDRO‐TESTING, FLUSHING, DRAININGND  PURGING TIE‐IN INLET PIPING  TIE‐IN TO SEPARATOR  (PARTIAL SHUTDOWN TIE‐IN) REPLACE THE SHUTVALVET POINT OF OIL‐IN  TIE‐IN / INSTALL SDV

3963‐ AREA

3963‐ DISC

U.M.

KN

PPIN

INS

KN

PPIN

SET

INS

KN

PPIN

PCS

INS

KN

PPIN

DIN

INS

KN

PPIN

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

0

19‐Dec‐18

27‐Dec‐18

0.03%

0.12%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

220.8

0

26‐Dec‐18

02‐Jan‐19

0.03%

0.16%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

2007.81

0

02‐Jan‐19

06‐Jan‐19

0.31%

1.48%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

334.88

0

02‐Jan‐19

06‐Jan‐19

0.05%

0.25%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

PCS

32.384

0

03‐Jan‐19

06‐Jan‐19

0.01%

0.02%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

25‐Aug‐18 12‐Nov‐18 06‐Dec‐18 06‐Dec‐18 09‐Dec‐18 09‐Dec‐18 18‐Dec‐18

21‐Nov‐18 17‐Nov‐18 15‐Dec‐18 20‐Dec‐18 27‐Dec‐18 23‐Dec‐18 31‐Dec‐18

0.00% 0.01% 0.03% 0.01% 0.03% 0.01% 0.02%

0.00% 0.07% 0.16% 0.06% 0.12% 0.06% 0.09%

100.000%

0.00%

‐30.34%

35.00%

100.000% 100.000% 33.333% 40.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% ‐33.33% ‐40.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

69.66% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

35.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

‐34.66% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.000%

Electrical

178 179 180 181 182

A5990 A6000 A3290 A3280 A3310 A3280‐2 A3270

1.30 1.30 1.30 1.30 1.30 1.30 1.30

CABLE TRENCHES EARTH PIT DRILLING  CABLE TRAY INSTALLATION U/G CABLE LAYING CABLE LAYING BACK FILLING OF CABLE TRENCH CABLE GLANDINGND TERMINATION

INS INS INS INS INS INS INS

KN KN KN KN KN KN KN

EL EL EL EL EL EL EL

M NO LM LM LM

500 3 301.4 170.5 165

LM

123.2

175 0 0 0 0 0 0

183

A3300

1.30 ELECTRICAL EQUIPMENTS INSTALLATION

INS

KN

EL

PCS

96.8

0

18‐Dec‐18

31‐Dec‐18

0.01%

0.07%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

184

A3320

1.30 LIGHTING FICTUREND DB INSTALLATION

INS

KN

EL

PCS

233.2

0

25‐Dec‐18

31‐Dec‐18

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

185 186 187

A3310‐1 A3330 A3340

INS INS INS

KN KN KN

EL EL EL

SET SET

44 44

0 0 0

31‐Dec‐18 05‐Jan‐19 09‐Jan‐19

05‐Jan‐19 09‐Jan‐19 12‐Jan‐19

0.00% 0.00% 0.01%

0.02% 0.02% 0.03%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

LM

36.3

0

22‐Nov‐18

12‐Dec‐18

0.02%

0.07%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

09‐Dec‐18 11‐Dec‐18 11‐Dec‐18

11‐Dec‐18 13‐Dec‐18 29‐Dec‐18

0.00% 0.00% 0.02%

0.01% 0.01% 0.07%

100.000% 41.667% 41.667%

0.00% 0.00% 0.00%

‐100.00% ‐41.67% ‐41.67%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

178

1.30 HOOK UP 1.30 ELECTRICAL TIE‐INS 1.30 ENERGIZATION Instrument & Control

25‐Aug‐18

189

A3950

1.20 CABLE TRAYND SUPPORT INSTALLATION

INS

KN

IN

189 190 190

A4790 A4870 A3980

1.20 JB SUPPORT INSTALLATION 1.20 JB INSTALLATION 1.20 INSTRUMENT CABLE LAYING

INS INS INS

KN KN KN

IN IN IN

LM

1218.8

0 0 0

191

A3970

1.20 INSTRUMENT EQUIPEMNT INSTALLATION

INS

KN

IN

SET

396

0

22‐Dec‐18

29‐Dec‐18

0.04%

0.18%

5.000%

0.00%

‐5.00%

0.00%

0.00%

0.00%

0.00%

192

A3970‐1

FIELD INSTRUMENT INSTALLATION (GAUGES  INS 1.20 & TRANSMITTERS)

KN

IN

0

24‐Dec‐18

30‐Dec‐18

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

191

A3970‐11

1.20 CABLE GLANDND TERMINATION (ALONG JBs) INS

192

A3970‐21

1.20

193

A3970‐2

1.20

194

A3990

1.20

195 196 197

A3970‐3 A4860 A3980‐2

1.20 1.50 1.20

198

A3960

1.20

CABLE GLANDND TERMINATION (ALONG  INSTRUMENTS) INSTALLATION OF BS & WNALYZERS ON  METERING SKID DCS MODIFICATION IN CONTROL ROOM BY  VENDOR INSTALLATION OF INSTRUMENT VALVE INSTALLATION OF  DELUGE SS TUBEND LEAK TEST INSTRUMENT EQUIPMENT CALIBRATION /  LOOP TEST

KN

IN

0

25‐Dec‐18

29‐Dec‐18

0.00%

0.01%

5.000%

0.00%

‐5.00%

0.00%

0.00%

0.00%

0.00%

INS

KN

IN

0

27‐Dec‐18

01‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KN

IN

0

29‐Dec‐18

31‐Dec‐18

0.02%

0.09%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KN

IN

0

29‐Dec‐18

07‐Jan‐19

0.02%

0.09%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS

KN KN KN

IN IN IN

SET

671

0 0 0

26‐Dec‐18 01‐Jan‐19 01‐Jan‐19

29‐Dec‐18 05‐Jan‐19 05‐Jan‐19

0.04% 0.03% 0.06%

0.18% 0.14% 0.27%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

INS

KN

IN

SET

154

0

02‐Jan‐19

06‐Jan‐19

0.08%

0.36%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS

KN KN KN KN KN

IN IN IN IN IN

0 0 0 0 0

09‐Dec‐18 11‐Dec‐18 11‐Dec‐18 11‐Dec‐18 12‐Dec‐18

12‐Dec‐18 20‐Dec‐18 15‐Dec‐18 13‐Dec‐18 15‐Dec‐18

0.00% 0.00% 0.00% 0.00% 0.00%

0.02% 0.02% 0.02% 0.02% 0.02%

100.000% 100.000% 41.667% 41.667% 5.000%

0.00% 0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% ‐41.67% ‐41.67% ‐5.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

F&G System 189 189 190 190 191

A6010 A6030 A6020 A6040 A6050

1.20 1.20 1.20 1.20 1.20

F&G SUPPORTS INSTALLATION F&G CABLE INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION

192

A6060

1.20 F&G CABLE GLANDINGND TERMINATION

INS

KN

IN

0

27‐Dec‐18

01‐Jan‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

191 192

A6070 A6080

INS INS

KN KN

IN IN

0 0

01‐Jan‐19 03‐Jan‐19

02‐Jan‐19 07‐Jan‐19

0.00% 0.00%

0.02% 0.02%

5.000% 0.000%

0.00% 0.00%

‐5.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

1.20 F&G LOOP PREPARATION 1.20 F&G LOOP TESTING Painting & Fireproofing

200

A4300

1.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS

KN

FP

SQM

206

0

15‐Dec‐18

23‐Dec‐18

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

201

A4310

1.10 PIPING PAINTINGND TOUCH‐UP

INS

KN

FP

SQM

178

0

29‐Dec‐18

06‐Jan‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

202

A4320

1.50 FIREPROOFING FOR STRUCTURAL STEEL

INS

KN

FP

SQM

1051.6

0

15‐Dec‐18

27‐Dec‐18

0.16%

0.77%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KN

DEM

PCS

8.8

0

26‐Jan‐19

29‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

DEPRESSURIZATION / ISOLATION (PIPING &  INS INSTRUMENTATION)

KN

DEM

PCS

34.1

0

29‐Jan‐19

30‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Demolition Works 204

D0000

1.60 WORK PERMITPPROVED FOR DEMOLITION

205

D0010

1.60

206

D0030

1.60 APPLYNTI RUST TO FOUNDATION BOTLS

INS

KN

DEM

PCS

22

0

30‐Jan‐19

02‐Feb‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

207

D0020

1.60 COLD CUTTING INLETND OUTLET PIPING

INS

KN

DEM

PCS

77

0

02‐Feb‐19

25‐Feb‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

208

D0040

1.60 UNBOLD & REMOVE EXISTING SEPARATOR

INS

KN

DEM

PCS

132

0

25‐Feb‐19

27‐Feb‐19

0.02%

0.10%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

209

D0050

1.60

REMOVE CONCRETE FOUNDATION / GRADE  INS THEREA

KN

DEM

PCS

174

0

28‐Feb‐19

13‐Mar‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

KAHM Civil Works

Page 90 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish 18‐Jul‐18

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

COMMOMN A1580

2.40 GRADING

INS

KM

CV

SQM

357.5

357.5

17‐Feb‐18

02‐Apr‐18

17‐Feb‐18

A1700

SOAKWAY PIT EXCAVATION & INSTALLATION  INS 2.40 INCL. DEMOLITION ‐  IFPPLICABLE

KM

CV

PCS

123.2

117.04

04‐Aug‐18

05‐Nov‐18

215

A1650

CABLE TRENCHESND UTILITY ROAD  2.40 CROSSINGS

KM

CV

LM

700

210

25‐Sep‐18

216

A1580‐1

2.40 PROTECTION OF UNDERGROUND CABLES

INS

KM

CV

0

217 218

A1660 A1690

INS INS

KM KM

CV CV

LM

0.187

0.1496 0

219

A1640

2.40 DRAINAGE PIPE CULVERTS 2.40 PAVING&GRADING(GRAVEL FILL) ROADSND PAVING(INCLUDING  2.40 MODIFICATIONS)

220

A1670

213 214

INS

0.06%

0.26%

100.000%

100.00%

0.00%

0.00%

100.00%

100.00%

0.00%

04‐Aug‐18

0.02%

0.09%

100.000%

95.00%

0.00%

0.00%

88.30%

95.00%

6.70%

21‐Nov‐18

25‐Sep‐18

0.01%

0.06%

100.000%

12.00%

‐46.55%

18.00%

53.45%

30.00%

‐23.45%

23‐Sep‐18

21‐Nov‐18

23‐Sep‐18

0.01%

0.06%

100.000%

50.00%

‐45.00%

10.00%

55.00%

60.00%

5.00%

16‐Oct‐18 05‐Jan‐19

05‐Dec‐18 14‐Jan‐19

16‐Oct‐18

0.01% 0.01%

0.03% 0.03%

0.000% 0.000%

70.00% 0.00%

19.61% 0.00%

10.00% 0.00%

19.61% 0.00%

80.00% 0.00%

60.39% 0.00%

INS

KM

CV

SQM

60.5

0

03‐Jan‐19

14‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

2.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS

KM

CV

PCS

107.8

0

05‐Jan‐19

14‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

TEST SEPERATOR 222

A1585

2.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

KM

CV

CUM

40

40

17‐Feb‐18

02‐Apr‐18

17‐Feb‐18

02‐Apr‐18

0.02%

0.09%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

223 224

A1590 A1590‐1

2.40 FOUNDATION WORK  (STEEL FIXING) 2.40 FOUNDATION WORK  (CONCRETE)

INS INS

KM KM

CV CV

kg CUM

1534 15.8

1534 15.8

19‐May‐18 01‐Apr‐18

18‐Jul‐18 04‐Aug‐18

19‐May‐18 01‐Apr‐18

18‐Jul‐18 04‐Aug‐18

0.01% 0.01%

0.06% 0.06%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

225

A1590‐2

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

CUM

45

45

09‐Jul‐18

18‐Aug‐18

09‐Jul‐18

19‐Jul‐18

0.01%

0.05%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

226

A1590‐2

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

CUM

45

45

09‐Jul‐18

18‐Aug‐18

09‐Jul‐17

18‐Aug‐18

0.00%

0.01%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

TEST SEPERATOR PLATFORM 228

A1585‐1

2.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

KM

CV

0

17‐Feb‐18

02‐Apr‐18

17‐Feb‐18

02‐Apr‐18

0.02%

0.09%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

229 230

A1590‐3 A1590‐4

2.40 FOUNDATION WORK  (STEEL FIXING) 2.40 FOUNDATION WORK  (CONCRETE)

INS INS

KM KM

CV CV

0 0

19‐May‐18 01‐Apr‐18

18‐Jul‐18 04‐Aug‐18

19‐May‐18 01‐Apr‐18

18‐Jul‐18 04‐Aug‐18

0.01% 0.01%

0.06% 0.06%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

231

A1590‐5

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

0

09‐Jul‐18

20‐Sep‐18

09‐Jul‐18

19‐Jul‐18

0.01%

0.05%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

232

A1590‐5

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

0

09‐Jul‐18

20‐Sep‐18

09‐Jul‐18

20‐Sep‐18

0.00%

0.01%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS INS INS

KM KM KM

CV CV CV

CUM kg CUM

60 1656 14.55

60 1656 14.55

03‐Mar‐18 19‐May‐18 01‐Apr‐18

01‐Apr‐18 18‐Jul‐18 02‐Aug‐18

03‐Mar‐18 19‐May‐18 01‐Apr‐18

01‐Apr‐18 18‐Jul‐18 02‐Aug‐18

0.04% 0.03% 0.03%

0.19% 0.12% 0.12%

100.000% 100.000% 100.000%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

METERING SKID 2.40 EXCAVATION 2.40 FOUNDATION WORK  (STEEL FIXING) 2.40 FOUNDATION WORK  (CONCRETE)

234 235 236

A1585‐2 A1630 A1630‐1

237

A1630‐2

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

CUM

108

108

01‐Jul‐18

18‐Sep‐18

01‐Jul‐18

19‐Jul‐18

0.02%

0.11%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

238

A1630‐2

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

CUM

108

108

01‐Jul‐18

18‐Sep‐18

01‐Jul‐18

18‐Sep‐18

0.00%

0.01%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

PIPE SUPPORT EXCAVATION FOR STRUCTURAL STEEL PIPE  SUPPORTS FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE) FOUNDATION WORK  (CONCRETE)

240

A1585‐3

INS

KM

CV

CUM

63.87

63.87

03‐Dec‐17

18‐Jul‐18

03‐Dec‐17

18‐Jul‐18

0.04%

0.19%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

241 242 243 244

A1610 A1610 A1610‐1 A1610‐1

XX XX XX XX

INS INS INS INS

KM KM KM KM

CV CV CV CV

CUM CUM CUM CUM

1455 1455 30 30

1455 1455 30 30

16‐Dec‐17 16‐Dec‐17 16‐Dec‐17 16‐Dec‐17

25‐Aug‐18 25‐Aug‐18 27‐Aug‐18 27‐Aug‐18

16‐Dec‐17 16‐Dec‐17 16‐Dec‐17 16‐Dec‐17

19‐Jul‐18 25‐Aug‐18 19‐Jul‐18 27‐Aug‐18

0.05% 0.00% 0.04% 0.00%

0.22% 0.01% 0.21% 0.02%

100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

245

A1610‐2

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

CUM

76

76

16‐Dec‐17

29‐Aug‐18

16‐Dec‐17

19‐Jul‐18

0.04%

0.19%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

246

A1610‐2

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

CUM

76

76

16‐Dec‐17

29‐Aug‐18

16‐Dec‐17

29‐Aug‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

2.40 2.40 2.40 2.40 2.40

PSV EXCAVATION (INCLUDINGREA LIGHTING  POLES) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE) FOUNDATION WORK  (CONCRETE)

248

A1585‐4

INS

KM

CV

CUM

100

100

17‐Feb‐18

21‐Jun‐18

17‐Mar‐18

21‐Jun‐18

0.04%

0.19%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

249 250 251 252

A1630‐3 A1630‐3 A1630‐4 A1630‐4

XX XX XX XX

INS INS INS INS

KM KM KM KM

CV CV CV CV

CUM CUM CUM CUM

3647 3647 26 26

3647 3647 26 26

20‐May‐18 20‐May‐18 20‐May‐18 20‐May‐18

25‐Aug‐18 25‐Aug‐18 26‐Aug‐18 26‐Aug‐18

20‐May‐18 20‐May‐18 18‐May‐18 18‐May‐18

19‐Jul‐18 25‐Aug‐18 19‐Jul‐18 26‐Aug‐18

0.01% 0.00% 0.01% 0.00%

0.05% 0.00% 0.05% 0.00%

100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

253

A1630‐5

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

CUM

206

206

02‐Jul‐18

13‐Sep‐18

02‐Jul‐18

19‐Jul‐18

0.01%

0.04%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

254

A1630‐5

XX 2.40 CURING / WATERPROOFING / BACK FILLING INS

KM

CV

CUM

206

206

02‐Jul‐18

13‐Sep‐18

02‐Jul‐18

13‐Sep‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

KM

STIN

Kg

9298

1394.7

14‐Oct‐18

29‐Nov‐18

14‐Oct‐18

0.10%

0.49%

100.000%

5.00%

‐74.47%

10.00%

25.53%

15.00%

‐10.53%

INS

KM

STIN

PCS

151

0

20‐Nov‐18

29‐Nov‐18

0.01%

0.04%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL OF  2.40 METERING SKID INCL. WALK WAY OR CROSS  INS OVER

KM

STIN

Kg

2470

247

04‐Oct‐18

22‐Nov‐18

04‐Oct‐18

0.01%

0.03%

100.000%

10.00%

‐56.00%

0.00%

44.00%

10.00%

‐34.00%

KM

STIN

Kg

1705

0

08‐Nov‐18

17‐Nov‐18

01‐Nov‐18

0.01%

0.06%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

2.40 2.40 2.40 2.40 2.40

Structural Steel TEST SEPERATOR 257

A2420

INSTALLATION OF STRUCTURAL STEELWORK  2.40 OPERATINGNDCCESS PLATFORMS (TEST  INS SEPERATOR & PLATFORM)

258

A2460

2.40

INSTALLATION OF LADDERS, STAIRS,  HANDRAILS

METERING SKID 260

A2430

PSV 262

A2440

2.40

INSTALLATION OF PSV VALVESCCESS  PLATFORMS

INS

Page 91 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Kg

4078

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

PIPE SUPPORT 264

A2450

INSTALLATION OF STRUCTURAL STEEL PIPE  2.40 SUPPORTS & MODIFICATIONS OF  EXISTINGCCESS PLATFORMS (IFPPLICABLE)

INS

KM

STIN

2.40 INSTALLATION OF INSTRUMENT STANCHION INS

KM

STIN

2.10 INSTALLATION OF NEW TEST SEPARATOR

KM

ME

KM

PPIN

KM

0

13‐Nov‐18

01‐Dec‐18

0.01%

0.05%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

0

25‐Nov‐18

01‐Dec‐18

0.01%

0.05%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

FIELD INSTRUMENT 266

A2450‐1

Mechanical 268

271 272 273 274

A2795

INS

Piping EARLY SHUTDOWN WORKS ‐ Pre Shutdownnd Plant Shutdown Tie‐in A5590 2.10 MOBILIZATION OF OF TEAMPPLY PTW INS SCAFFOLDING / PLATE FORM / WORK  A5600 INS 2.10 PERMIT ISSUE A5610 2.10 PIPING TIE‐IN / NDT INS A5620 2.10 TIE‐IN COMPLETE / REMOVE SCAFFOLD INS PIPING ‐REMAINING PIPING INSTALLATION ON PIPE  SUPPORT,PIERACK &ROUND EQUIPMENT

SET

137.5

137.5

16‐Oct‐18

18‐Oct‐18

16‐Oct‐18

18‐Oct‐18

0.02%

0.10%

100.000%

20.00%

0.00%

80.00%

100.00%

100.00%

0.00%

0

31‐Dec‐17

31‐Dec‐17

31‐Dec‐17

31‐Dec‐17

0.01%

0.06%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

PPIN

PCS

156

156

31‐Dec‐17

05‐Jan‐18

31‐Dec‐17

05‐Jan‐18

0.01%

0.06%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

KM KM

PPIN PPIN

DIN PCS

93 16

93 16

09‐Feb‐18 06‐Feb‐18

14‐Feb‐18 17‐Feb‐18

09‐Feb‐18 06‐Feb‐18

14‐Feb‐18 17‐Feb‐18

0.02% 0.00%

0.07% 0.01%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

DIN

392.6

0

29‐Nov‐18

22‐Dec‐18

0.03%

0.14%

17.857%

0.00%

‐17.86%

0.00%

0.00%

0.00%

0.00%

0

11‐Dec‐18

20‐Dec‐18

0.03%

0.14%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

276

A2970

2.10

INS

KM

PPIN

277

A2970‐1

2.10 INSTALLATION OF BALL VALVE & GGC VALVE INS

KM

PPIN

INS

KM

PPIN

SET

220

0

17‐Dec‐18

26‐Dec‐18

0.03%

0.16%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KM

PPIN

DIN

390

0

26‐Dec‐18

30‐Dec‐18

0.06%

0.29%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KM

PPIN

PCS

2000

0

26‐Dec‐18

30‐Dec‐18

0.31%

1.47%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KM

PPIN

PCS

60

0

27‐Dec‐18

30‐Dec‐18

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

25‐Sep‐18 17‐Nov‐18 25‐Nov‐18 28‐Nov‐18 10‐Dec‐18 15‐Dec‐18 15‐Dec‐18

21‐Nov‐18 20‐Nov‐18 04‐Dec‐18 13‐Dec‐18 26‐Dec‐18 27‐Dec‐18 27‐Dec‐18

0.00% 0.00% 0.01% 0.02% 0.02% 0.02% 0.02%

0.00% 0.02% 0.05% 0.11% 0.08% 0.07% 0.09%

100.000% 0.000% 100.000% 0.000% 0.000% 0.000% 0.000%

5.00% 0.00% 5.00% 0.00% 0.00% 0.00% 0.00%

‐46.55% 0.00% ‐100.00% 0.00% 0.00% 0.00% 0.00%

25.00% 0.00% ‐5.00% 0.00% 0.00% 0.00% 0.00%

53.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

30.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

‐23.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

278

A2990

2.10

279

A2980

2.10

280

A3000

2.10

281

A3001

2.10

HYDRO‐TESTING, FLUSHING, DRAININGND  PURGING INLET PIPING  TIE‐IN TO SEPARATOR  (PARTIAL SHUTDOWN TIE‐IN) TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN  TIE‐IN / INSTALL SDV

Electrical 283 284 283 284 285 286 287

A6090 A3440 A3380 A3370 A3400 A3370‐1 A3360

2.30 2.30 2.30 2.30 2.30 2.30 2.30

CABLE TRENCHES EARTH PIT DRILLING CABLE TRAY INSTALLATION U/G CABLE LAYING CABLE LAYING BACK FILLING OF CABLE TRENCH CABLE GLANDINGND TERMINATION

INS INS INS INS INS INS INS

KM KM KM KM KM KM KM

EL EL EL EL EL EL EL

LM NO LM LM LM

700 3 292.6 154 114.4

LM

116.6

210 0 0 0 0 0 0

288

A3390

2.30 ELECTRICAL EQUIPMENTS INSTALLATION

INS

KM

EL

PCS

92.4

0

15‐Dec‐18

27‐Dec‐18

0.01%

0.07%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

289

A3410

2.30 LIGHTING FIXTUREND DB INSTALLATION

PCS

231

0

22‐Dec‐18

27‐Dec‐18

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

290 291 292

A3400‐1 A3420 A3430

SET SET

44 44

0 0 0

29‐Dec‐18 02‐Jan‐19 07‐Jan‐19

01‐Jan‐19 06‐Jan‐19 09‐Jan‐19

0.02% 0.01% 0.01%

0.07% 0.03% 0.03%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

26‐Nov‐18 11‐Dec‐18 15‐Dec‐18 05‐Dec‐18

13‐Dec‐18 13‐Dec‐18 17‐Dec‐18 25‐Dec‐18

0.02% 0.00% 0.00% 0.02%

0.08% 0.01% 0.01% 0.08%

100.000% 100.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

INS

KM

EL

HOOK UP ELECTRICAL TIE‐INS ENERGIZATION

INS INS INS

KM KM KM

EL EL EL

CABLE TRAY/DUCT INSTALLATION JB SUPPORT INSTLLATION JB INSTALLATION INSTRUMENT CABLE LAYING

INS INS INS INS

KM KM KM KM

IN IN IN IN

LM

36.3

LM

1464.1

0 0 0 0

INS

KM

IN

SET

317.9

294 294 295 295

2.30 2.30 2.30 Instrument & Control A4000 2.20 A4590 2.20 A5350 2.20 A4030 2.20

296

A4020

2.20 INSTRUMENT EQUIPEMNT INSTALLATION

0

25‐Dec‐18

01‐Jan‐19

0.04%

0.19%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

297

A4020‐1

2.20

FIELD INSTRUMENT INSTALLATION (GAUGES  INS & TRANSMITTER)

KM

IN

0

25‐Dec‐18

01‐Jan‐19

0.04%

0.19%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

296

A4020‐11

2.20 CABLE GLANDND TERMINATION (ALONG JBs) INS

297

A4020‐21

2.20

298

A4040

2.20

299

A4020‐2

2.20

300 301 302

A4020‐3 A4030‐1 A5280

2.20 2.20 2.50

303

A4010

2.20

CABLE GLANDND TERMINATION (ALONG  INSTRUMENTS) DCS MODIFICATION IN CONTROL ROOM BY  VENDOR INSTALLATION OF BS & WNALYZERS ON  METERING SKID INSTALLATION OF INSTRUMENT VALVE SS TUBEND LEAK TEST INSTALLATION OF  DELUGE INSTRUMENT EQUIPMENT CALIBRATION /  LOOP TEST

KM

IN

0

30‐Dec‐18

05‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KM

IN

0

30‐Dec‐18

06‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KM

IN

0

23‐Dec‐18

01‐Jan‐19

0.02%

0.10%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KM

IN

0

30‐Dec‐18

01‐Jan‐19

0.02%

0.10%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS

KM KM KM

IN IN IN

SET

671

0 0 0

01‐Jan‐19 02‐Jan‐19 01‐Jan‐19

05‐Jan‐19 06‐Jan‐19 07‐Jan‐19

0.04% 0.06% 0.03%

0.19% 0.29% 0.15%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

INS

KM

IN

SET

154

0

07‐Jan‐19

10‐Jan‐19

0.08%

0.39%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS

KM KM KM KM KM

IN IN IN IN IN

0 0 0 0 0

10‐Dec‐18 12‐Dec‐18 15‐Dec‐18 16‐Dec‐18 17‐Dec‐18

13‐Dec‐18 16‐Dec‐18 16‐Dec‐18 25‐Dec‐18 18‐Dec‐18

0.00% 0.00% 0.00% 0.00% 0.00%

0.02% 0.02% 0.02% 0.02% 0.02%

100.000% 100.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

F&G System 294 294 295 295 296

A6100 A6110 A6130 A6120 A6140

2.50 2.50 2.50 2.50 2.50

F&G SUPPORT INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G CABLE INSTALLATION F&G JB INSTALLATION

297

A6150

2.50 F&G CABLE GLANDINGND TERMINATION

INS

KM

IN

0

31‐Dec‐18

05‐Jan‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

296 297

A6160 A6170

2.50 F&G LOOP PREPARATION 2.50 F&G LOOP TESTING

INS INS

KM KM

IN IN

0 0

05‐Jan‐19 07‐Jan‐19

06‐Jan‐19 10‐Jan‐19

0.00% 0.00%

0.02% 0.02%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

Page 92 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

305

Painting & Fireproofing A4340 2.10 PIPING PAINTINGND TOUCH‐UP

INS

KM

FP

SQM

277

0

22‐Dec‐18

29‐Dec‐18

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

306

A4350

2.50 FIREPROOFING FOR STRUCTURAL STEEL

INS

KM

FP

SQM

1180.3

0

02‐Dec‐18

20‐Dec‐18

0.18%

0.87%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

307

A4330

2.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS

KM

FP

SQM

231.3

0

28‐Nov‐18

08‐Dec‐18

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KM

DEM

PCS

8.8

0

24‐Jan‐19

27‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

DEPRESSURIZATION / ISOLATION (PIPING &  INS INSTRUMENTATION)

KM

DEM

PCS

41.8

0

27‐Jan‐19

29‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Demolition Works 309

DM1000

2.60 WORK PERMITPPROVED FOR DEMOLITION

310

DM1010

2.60

311

DM1030

2.60 APPLYNTI RUST TO FOUNDATION BOTLS

INS

KM

DEM

PCS

28.6

0

29‐Jan‐19

30‐Jan‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

312

DM1020

2.60 COLD CUTTING INLETND OUTLET PIPING

INS

KM

DEM

PCS

66

0

30‐Jan‐19

23‐Feb‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

313

DM1040

2.60 UNBOLD & REMOVE EXISTING SEPARATOR

INS

KM

DEM

PCS

165

0

23‐Feb‐19

24‐Feb‐19

0.03%

0.12%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

314

DM1050

REMOVE CONCRETE FOUNDATION / GRADE  INS 2.60 THEREA

KM

DEM

PCS

218

0

24‐Feb‐19

10‐Mar‐19

0.03%

0.16%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

A1710

3.40 GRADING

INS

KS

CV

SQM

286

286

10‐Feb‐18

31‐May‐18

10‐Feb‐18

0.04%

0.21%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

319

A1715‐6

SOAKWAY PIT EXCAVATION & INSTALLATION  INS 3.40 INCL. DEMOLITION ‐  IFPPLICABLE

KS

CV

0

06‐Aug‐18

03‐Nov‐18

06‐Aug‐18

0.01%

0.05%

100.000%

95.00%

0.00%

98.00%

90.00%

98.00%

8.00%

320

A1780‐2

3.40 CABLE TRENCHES

INS

KS

CV

0

24‐Sep‐18

22‐Nov‐18

24‐Sep‐18

0.00%

0.00%

100.000%

20.00%

0.00%

35.00%

53.33%

35.00%

‐18.33%

321

A1710‐1

3.40 PROTECTION OF UNDERGROUND CABLES

INS

KS

CV

0

14‐Sep‐18

22‐Nov‐18

14‐Sep‐18

0.00%

0.01%

100.000%

90.00%

0.00%

90.00%

60.00%

90.00%

30.00%

322 323

A1780 A1790

INS INS

KS KS

CV CV

PCS LM

140.8 0.187

0 0

11‐Dec‐18 08‐Dec‐18

09‐Jan‐19 30‐Dec‐18

0.01% 0.01%

0.05% 0.05%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

324

A1770

3.40 UTILITY ROAD CROSSINGS 3.40 DRAINAGE PIPE CULVERTS ROADSND PAVING(INCLUDING  3.40 MODIFICATIONS)

INS

KS

CV

SQM

35.2

0

31‐Dec‐18

14‐Jan‐19

0.00%

0.00%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

325

A1800

3.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS

KS

CV

PCS

132

0

31‐Dec‐18

14‐Jan‐19

0.00%

0.00%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

326

A1800‐1

3.40

RE‐INSTATEMENT OF EXISTING PAVEMENT  (INTERLOCK PAVING)

KS

CV

0

30‐Dec‐18

13‐Jan‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

KAHS Civil Works COMMOMN 318

INS

19‐Jul‐18

TEST SEPERATOR 328

A1715

3.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

KS

CV

CUM

40

40

10‐Feb‐18

01‐Mar‐18

10‐Feb‐18

01‐Mar‐18

0.02%

0.08%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

329 330

A1720 A1720‐1

3.40 FOUNDATION WORK  (STEEL FIXING) 3.40 FOUNDATION WORK  (CONCRETE)

INS INS

KS KS

CV CV

kg CUM

1656 14.55

1656 14.55

07‐Apr‐18 07‐Apr‐18

12‐Apr‐18 26‐Apr‐18

07‐Apr‐18 07‐Apr‐18

12‐Apr‐18 26‐Apr‐18

0.01% 0.01%

0.06% 0.06%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

331

A1720‐2

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

CUM

108

108

17‐May‐18

08‐Aug‐18

17‐May‐18

16‐Jul‐18

0.01%

0.06%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

332

A1720‐2

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

CUM

108

108

17‐May‐18

08‐Aug‐18

17‐May‐18

08‐Aug‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

TEST SEPERATOR PLATFORM 334

A1715‐1

3.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

KS

CV

0

10‐Feb‐18

01‐Mar‐18

10‐Feb‐18

01‐Mar‐18

0.02%

0.08%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

335 336

A1720‐3 A1720‐4

3.40 FOUNDATION WORK  (STEEL FIXING) 3.40 FOUNDATION WORK  (CONCRETE)

INS INS

KS KS

CV CV

0 0

07‐Apr‐18 07‐Apr‐18

12‐Apr‐18 26‐Apr‐18

07‐Apr‐18 07‐Apr‐18

12‐Apr‐18 26‐Apr‐18

0.01% 0.01%

0.06% 0.06%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

337

A1720‐5

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

0

17‐May‐18

08‐Aug‐18

17‐May‐18

16‐Jul‐18

0.01%

0.06%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

338

A1720‐5

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

0

17‐May‐18

08‐Aug‐18

17‐May‐18

08‐Aug‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS INS INS

KS KS KS

CV CV CV

CUM kg CUM

60 1656 14.55

60 1656 14.55

10‐Feb‐18 22‐Mar‐18 18‐Mar‐18

24‐Mar‐18 12‐Apr‐18 24‐May‐18

10‐Feb‐18 22‐Mar‐18 18‐Mar‐18

24‐Mar‐18 12‐Apr‐18 24‐May‐18

0.03% 0.02% 0.02%

0.16% 0.11% 0.11%

100.000% 100.000% 100.000%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

METERING SKID 3.40 EXCAVATION 3.40 FOUNDATION WORK  (STEEL FIXING) 3.40 FOUNDATION WORK  (CONCRETE)

340 341 342

A1715‐2 A1760‐1 A1760

343

A1760‐2

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

CUM

108

108

15‐May‐18

08‐Aug‐18

15‐May‐18

19‐Jul‐18

0.02%

0.11%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

344

A1760‐2

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

CUM

108

108

15‐May‐18

08‐Aug‐18

15‐May‐18

08‐Aug‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

PIPE SUPPORT EXCAVATION FOR STRUCTURAL STEEL PIPE  SUPPORTS FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE) FOUNDATION WORK  (CONCRETE)

346

A1715‐3

INS

KS

CV

CUM

72

72

25‐Dec‐17

19‐Jul‐18

10‐Feb‐18

19‐Apr‐18

0.03%

0.16%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

347 348 349 350

A1740 A1740 A1740‐1 A1740‐1

XX XX XX XX

INS INS INS INS

KS KS KS KS

CV CV CV CV

CUM CUM CUM CUM

4200 4200 35 35

4200 4200 35 35

25‐Dec‐17 25‐Dec‐17 25‐Dec‐17 25‐Dec‐17

08‐Aug‐18 08‐Aug‐18 14‐Aug‐18 14‐Aug‐18

25‐Dec‐17 25‐Dec‐17 25‐Dec‐17 25‐Dec‐17

19‐Jul‐18 08‐Aug‐18 19‐Jul‐18 14‐Aug‐18

0.03% 0.00% 0.03% 0.00%

0.15% 0.00% 0.15% 0.00%

100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

351

A1740‐2

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

CUM

150

150

25‐Dec‐17

25‐Oct‐18

25‐Dec‐17

19‐Jul‐18

0.03%

0.15%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

352

A1740‐2

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

CUM

150

150

25‐Dec‐17

25‐Oct‐18

25‐Dec‐17

0.00%

0.00%

100.000%

98.00%

0.00%

100.00%

100.00%

100.00%

0.00%

100.00%

100.00%

0.00%

100.00% 100.00% Page 93 of 170

0.00%

3.40 3.40 3.40 3.40 3.40

PSV 354

A1715‐4

355

A1760‐5

EXCAVATION (INCLUDINGREA LIGHTING  POLES) 3.40 FOUNDATION WORK  (STEEL FIXING) 3.40

INS

KS

CV

CUM

100

100

05‐Mar‐18

31‐May‐18

05‐Mar‐18

31‐May‐18

0.03%

0.16%

100.000%

100.00%

0.00%

100.00%

INS

KS

CV

CUM

3647

3647

25‐Mar‐18

17‐May‐18

25‐Mar‐18

17‐May‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

Sr.no. Activity ID XX

Inv  Code

Activity Name

3.40 FOUNDATION WORK  (CONCRETE)

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

356

A1760‐3

INS

KS

CV

CUM

26

26

18‐Mar‐18

21‐Jun‐18

18‐Mar‐18

21‐Jun‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

357

A1760‐4

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

CUM

206

206

18‐Mar‐18

06‐Aug‐18

18‐Mar‐18

19‐Jul‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

358

A1760‐4

XX 3.40 CURING / WATERPROOFING / BACK FILLING INS

KS

CV

CUM

206

206

18‐Mar‐18

06‐Aug‐18

18‐Mar‐18

06‐Aug‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

KS

STIN

Kg

9298

929.8

27‐Sep‐18

21‐Nov‐18

27‐Sep‐18

0.09%

0.45%

100.000%

10.00%

‐48.21%

10.00%

51.79%

10.00%

‐41.79%

INS

KS

STIN

Kg

4078

0

12‐Nov‐18

21‐Nov‐18

0.01%

0.06%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL OF  3.40 METERING SKID INCL. WALK WAY OR CROSS  INS OVER

KS

STIN

Kg

2470

2470

13‐Oct‐18

23‐Oct‐18

13‐Oct‐18

23‐Oct‐18

0.01%

0.03%

100.000%

70.00%

0.00%

100.00%

100.00%

100.00%

0.00%

01‐Nov‐18

0.01%

0.06%

100.000%

35.00%

0.00%

35.00%

30.00%

35.00%

5.00%

0.00%

0.02%

100.000%

10.00%

‐67.35%

20.00%

32.65%

20.00%

‐12.65%

0.00%

0.02%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

Structural Steel TEST SEPERATOR 361

A2480

INSTALLATION OF STRUCTURAL STEELWORK  3.40 OPERATINGNDCCESS PLATFORMS (TEST  INS SEPERATOR & PLATFORM)

362

A2510

3.40

INSTALLATION OF LADDERS, STAIRS,  HANDRAILS

METERING SKID 364

A2490

PSV 366

A2500

INSTALLATION OF PSV VALVESCCESS  PLATFORMS

INS

KS

STIN

Kg

1705

596.75

17‐Oct‐18

15‐Nov‐18

17‐Oct‐18

INSTALLATION OF STRUCTURAL STEEL PIPE  3.40 SUPPORTS & MODIFICATIONS OF  EXISTINGCCESS PLATFORMS (IFPPLICABLE)

INS

KS

STIN

PCS

151

30.2

10‐Oct‐18

27‐Nov‐18

10‐Oct‐18

3.40 INSTALLATION OF INSTRUMENT STANCHION INS

KS

STIN

0

25‐Nov‐18

29‐Nov‐18

3.10 INSTALLATION OF NEW TEST SEPARATOR

KS

ME

KS

PPIN

KS

3.40

PIPE SUPPORT 368

A2520

FIELD INSTRUMENT 370

A2520‐1

Mechanical 372

375 376 377 378

A2815

INS

Piping EARLY SHUTDOWN WORKS ‐ Pre Shutdownnd Plant Shutdown Tie‐in A3061 3.10 MOBILIZATION OF OF TEAMPPLY PTW INS SCAFFOLDING / PLATE FORM / WORK  A3071 INS 3.10 PERMIT ISSUE A3091 3.10 TIE‐IN COMPLETE / REMOVE SCAFFOLD INS A3081 3.10 PIPING TIE‐IN / NDT INS STATION PIPING PIPING INSTALLATION ON PIPE  SUPPORT,PIERACK &ROUND EQUIPMENT

SET

137.5

137.5

09‐Aug‐18

09‐Aug‐18

09‐Aug‐18

09‐Aug‐18

0.02%

0.10%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

0

31‐Dec‐17

31‐Dec‐17

31‐Dec‐17

31‐Dec‐17

0.01%

0.05%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

PPIN

PCS

142

142

31‐Dec‐17

05‐Jan‐18

31‐Dec‐17

05‐Jan‐17

0.01%

0.05%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

KS KS

PPIN PPIN

PCS DIN

14 85

14 85

06‐Feb‐18 09‐Feb‐18

17‐Feb‐18 14‐Feb‐18

06‐Feb‐18 09‐Feb‐18

17‐Feb‐18 14‐Feb‐18

0.00% 0.01%

0.01% 0.06%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

DIN

368

0

16‐Dec‐18

05‐Jan‐19

0.03%

0.14%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

380

A3020

3.10

INS

KS

PPIN

381

A3020‐1

3.10 INSTALLATION OF BALL VALVE & GGC VALVE INS

382

A3040

KS

PPIN

0

24‐Dec‐18

02‐Jan‐19

0.03%

0.14%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KS

PPIN

SET

220.8

0

24‐Dec‐18

06‐Jan‐19

0.03%

0.16%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KS

PPIN

DIN

367.896

0

06‐Jan‐19

09‐Jan‐19

0.06%

0.27%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KS

PPIN

PCS

1752.78

0

06‐Jan‐19

09‐Jan‐19

0.27%

1.29%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KS

PPIN

PCS

60.72

0

07‐Jan‐19

09‐Jan‐19

0.01%

0.04%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS

KS KS KS KS

IN IN IN IN

LM

36.3

0 0 0 0

13‐Nov‐18 02‐Dec‐18 04‐Dec‐18 05‐Dec‐18

02‐Dec‐18 05‐Dec‐18 06‐Dec‐18 24‐Dec‐18

0.01% 0.00% 0.00% 0.01%

0.06% 0.01% 0.01% 0.06%

100.000% 100.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

SET

317.9

387 387 388 388

HYDRO‐TESTING, FLUSHING, DRAININGND  PURGING INLET PIPING  TIE‐IN TO SEPARATOR  A3030 3.10 (PARTIAL SHUTDOWN TIE‐IN) A3050 3.10 TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN  A3051 3.10 TIE‐IN / INSTALL SDV Instrument & Control A4050 3.20 CABLE TRAY/DUCT INSTALLATION A4640 3.20 JB SUPPORT INSTALLATION A4740 3.20 JB INSTALLATION A4080‐1 3.20 INSTRUMENT CABLE LAYING

389

A4070

3.20 INSTRUMENT EQUIPEMNT INSTALLATION 

INS

KS

IN

0

20‐Dec‐18

26‐Dec‐18

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

390

A4080‐2

3.20

FIELD INSTRUMENT INSTALLATION  (GAUGESND TRANSMITTERS)

INS

KS

IN

0

16‐Dec‐18

23‐Dec‐18

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

389

A4080‐11

3.20 CABLE GLANDND TERMINATION (ALONG JB) INS

KS

IN

0

24‐Dec‐18

03‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

390

A4080‐21

3.20

KS

IN

0

20‐Dec‐18

25‐Dec‐18

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

391

A4090

3.20

392

A4090‐1

3.20

393 394

A4090‐2 A5300

3.20 3.50

395

A4060

3.20

396

A4080

3.20

CABLE GLANDND TERMINATION (ALONG  INSTRUMENT) DCS INSTALLATION IN CONTROL ROOM BY  VENDOR INSTALLATION OF BS & WNALYZERS ON  METERING SKID INSTALLATION OF INSTRUMENT VALVE INSTALLATION OF  DELUGE INSTRUMENT EQUIPMENT CALIBRATION /  LOOP TEST SS TUBEND LEAK TEST

3.40 3.30 3.30 3.30

CABLE TRENCH EARTH PIT DRILLING U/G CABLE LAYING CABLE TRAY INSTALLATION

383 384 385

3.10

INS

0.000%

INS

KS

IN

0

25‐Dec‐18

05‐Jan‐19

0.02%

0.07%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KS

IN

0

25‐Dec‐18

26‐Dec‐18

0.02%

0.07%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS

KS KS

IN IN

SET

0 0

23‐Dec‐18 01‐Jan‐19

25‐Dec‐18 08‐Jan‐19

0.03% 0.02%

0.15% 0.11%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00% 0.00%

451

INS

KS

IN

SET

0

0

05‐Jan‐19

08‐Jan‐19

0.05%

0.22%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KS

IN

LM

1056

0

01‐Jan‐19

05‐Jan‐19

0.06%

0.30%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS

KS KS KS KS

IN IN EL EL

M NO LM LM

500 3 161.7 292.6

400 0 0 0

24‐Sep‐18 08‐Nov‐18 29‐Nov‐18 22‐Nov‐18

22‐Nov‐18 12‐Nov‐18 04‐Dec‐18 01‐Dec‐18

0.00% 0.00% 0.02% 0.01%

0.00% 0.02% 0.12% 0.05%

100.000% 0.000% 100.000% 100.000%

0.00% 0.00% 0.00% 0.00%

‐46.67% 0.00% ‐100.00% ‐100.00%

80.00% 0.00% 0.00% 0.00%

53.33% 0.00% 0.00% 0.00%

80.00% 0.00% 0.00% 0.00%

26.67% 0.00% 0.00% 0.00%

Electrical 387 388 398 399

A1780‐12 A3530 A3460 A3470

Page 94 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

400 401 402

A3490 A3460‐1 A3450

3.30 CABLE LAYING 3.30 BACK FILLING OF CABLE TRENCH 3.30 CABLE GLANDINGND TERMINATION

INS INS INS

KS KS KS

EL EL EL

LM

88

LM

116.6

0 0 0

02‐Dec‐18 02‐Dec‐18 22‐Dec‐18

10‐Dec‐18 11‐Dec‐18 29‐Dec‐18

0.01% 0.02% 0.02%

0.06% 0.07% 0.09%

42.105% 53.333% 7.143%

0.00% 0.00% 0.00%

‐42.11% ‐53.33% ‐7.14%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

403

A3480

3.30 ELECTRICAL EQUIPMENTS INSTALLATION

INS

KS

EL

PCS

92.4

0

09‐Dec‐18

19‐Dec‐18

0.01%

0.07%

7.143%

0.00%

‐7.14%

0.00%

0.00%

0.00%

0.00%

404

A3500

3.30 LIGHTING FIXTUREND DB INSTALLATION

INS

KS

EL

PCS

231

0

16‐Dec‐18

24‐Dec‐18

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

405 406 407

A3510‐1 A3510 A3520

3.30 HOOK UP 3.30 ELECTRICAL TIE‐INS 3.30 ENERGIZATION

INS INS INS

KS KS KS

EL EL EL

SET SET

44 44

0 0 0

25‐Dec‐18 03‐Jan‐19 05‐Jan‐19

29‐Dec‐18 05‐Jan‐19 07‐Jan‐19

0.02% 0.01% 0.01%

0.07% 0.03% 0.03%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

INS INS INS INS INS

KS KS KS KS KS

IN IN IN IN IN

LM

36.3

SET

317.9

0 0 0 0 0

28‐Nov‐18 04‐Dec‐18 05‐Dec‐18 05‐Dec‐18 06‐Dec‐18

02‐Dec‐18 09‐Dec‐18 15‐Dec‐18 06‐Dec‐18 09‐Dec‐18

0.00% 0.00% 0.00% 0.00% 0.00%

0.01% 0.01% 0.01% 0.01% 0.01%

100.000% 100.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

INS

KS

IN

0

20‐Dec‐18

25‐Dec‐18

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

KS KS

IN IN

0 0

25‐Dec‐18 31‐Dec‐18

27‐Dec‐18 05‐Jan‐19

0.00% 0.00%

0.01% 0.01%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

F&G System 387 387 388 388 389

A5920 A5930 A5910 A5940 A5950

3.50 3.50 3.50 3.50 3.50

F&G SUPPORTS INSTALLATION F&G DEVICES INSTALLATION F&G CABLE INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION

390

A5960

3.50 F&G CABLE GLANDINGND TERMINATION

389 390

A5970 A5980

INS INS

3.50 F&G LOOP PREPARATION 3.50 F&G LOOP TESTING Painting & Fireproofing

409

A4360

3.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS

KS

FP

SQM

194

0

15‐Dec‐18

27‐Dec‐18

0.03%

0.14%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

410

A4370

3.10 PIPING PAINTINGND TOUCH‐UP

INS

KS

FP

SQM

259

0

24‐Dec‐18

27‐Dec‐18

0.04%

0.19%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

411

A4380

3.50 FIREPROOFING FOR STRUCTURAL STEEL

INS

KS

FP

SQM

995.5

0

19‐Dec‐18

06‐Jan‐19

0.15%

0.73%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

KS

DEM

PCS

8.8

0

17‐Jan‐19

20‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Demolition Works DM1070

3.60 WORK PERMITPPROVED FOR DEMOLITION

414

DM1080

DEPRESSURIZATION / ISOLATION (PIPING &  INS 3.60 INSTRUMENTATION)

KS

DEM

PCS

39.93

0

27‐Jan‐19

28‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

415

DM1100

3.60 APPLYNTI RUST TO FOUNDATION BOTLS

KS

DEM

PCS

19.965

0

28‐Jan‐19

30‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

416

DM1090

COLD CUTTING INLETND OUTLET PIPING  3.60 REMOVAL

INS

KS

DEM

PCS

39.93

0

28‐Jan‐19

20‐Feb‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

417

DM1110

3.60 UNBOLD & REMOVE EXISTING SEPARATOR

INS

KS

DEM

PCS

139.755

0

20‐Feb‐19

24‐Feb‐19

0.02%

0.10%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

DM1120

REMOVE CONCRETE FOUNDATION / GRADE  INS 3.60 THEREA

KS

DEM

PCS

169

0

24‐Feb‐19

10‐Mar‐19

0.03%

0.12%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

SQM

374

374

05‐Jun‐18

12‐Jun‐18

05‐Jun‐18

0.06%

0.28%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

0

23‐Aug‐18

21‐Nov‐18

23‐Aug‐18

0.02%

0.09%

100.000%

70.00%

‐29.67%

77.00%

70.33%

77.00%

6.67%

18‐Oct‐10

413

418

INS

JALM Civil Works COMMOMN 422

A1840

7.40 GRADING

INS

JL

CV

423

A1845‐6

7.40

SOAKWAY PIT EXCAVATION & INSTALLATION  INS INCL. DEMOLITION ‐  IFPPLICABLE

JL

CV

424

A1910

7.40

CABLE TRENCHESND UTILITY ROAD  CROSSINGS

INS

JL

CV

425

A1840‐1

7.40 PROTECTION OF UNDERGROUND CABLES

INS

JL

CV

426

A1920

7.40 DRAINAGE PIPE CULVERTS

INS

JL

CV

LM

427

A1936

7.40 RE‐INSTATEMENT OF EXISTINGSPHALT ROAD INS

JL

CV

428

A1930

7.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS

JL

CV

RE‐INSTATEMENT OF EXISTING PAVEMENT  7.40 (INTERLOCK PAVING) 7.40 NEW RETAINING WALLS 7.40 CONCRETE KERB

INS

JL

INS INS

JL JL

429

A1938

430 431

A1935 A1937

PCS

316.8

18‐Jul‐18

15.84

18‐Oct‐18

23‐Dec‐18

0.02%

0.09%

68.966%

0.00%

‐57.03%

5.00%

11.94%

5.00%

‐6.94%

0

04‐Dec‐18

09‐Dec‐18

0.02%

0.09%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

56.1

0

09‐Dec‐18

20‐Jan‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

SQM

14.3

0

13‐Mar‐19

28‐Mar‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

PCS

66

0

17‐Mar‐19

31‐Mar‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

CV

SQM

13.2

0

17‐Mar‐19

31‐Mar‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

CV CV

CUM CUM

168 235.4

0 0

13‐Mar‐19 13‐Mar‐19

28‐Mar‐19 28‐Mar‐19

0.03% 0.04%

0.14% 0.19%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

TEST SEPERATOR 433

A1845

XX 7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

JL

CV

CUM

55.33

55.33

12‐Jun‐18

09‐Aug‐18

12‐Jun‐18

18‐Jul‐18

0.03%

0.16%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

434

A1845

XX 7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

JL

CV

CUM

55.33

55.33

12‐Jun‐18

09‐Aug‐18

12‐Jun‐18

09‐Aug‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

435 436 437

A1850 A1850 A1850‐1

XX 7.40 FOUNDATION WORK  (STEEL FIXING) XX 7.40 FOUNDATION WORK  (STEEL FIXING) 7.40 FOUNDATION WORK  (CONCRETE)

INS INS INS

JL JL JL

CV CV CV

CUM CUM CUM

1534 1534 15.8

1534 1534 15.8

10‐Jul‐18 10‐Jul‐18 13‐Aug‐18

19‐Aug‐18 19‐Aug‐18 23‐Aug‐18

10‐Jul‐18 10‐Jul‐18 13‐Aug‐18

19‐Jul‐18 19‐Aug‐18 23‐Aug‐18

0.01% 0.01% 0.01%

0.05% 0.06% 0.03%

100.000% 100.000% 100.000%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

438

A1850‐2

7.40 CURING / WATERPROOFING / BACK FILLING INS

JL

CV

CUM

45

45

26‐Aug‐18

08‐Oct‐18

26‐Aug‐18

08‐Oct‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

TEST SEPERATOR PLATFORM 440

A1845‐1

7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

JL

CV

0

27‐Jul‐18

11‐Aug‐18

27‐Jul‐18

11‐Aug‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

441 442

A1850‐3 A1850‐4

7.40 FOUNDATION WORK  (STEEL FIXING) 7.40 FOUNDATION WORK  (CONCRETE)

INS INS

JL JL

CV CV

0 0

12‐Aug‐18 03‐Sep‐18

03‐Sep‐18 22‐Sep‐18

12‐Aug‐18 03‐Sep‐18

03‐Sep‐18 22‐Sep‐18

0.01% 0.01%

0.03% 0.03%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

443

A1850‐5

7.40 CURING / WATERPROOFING / BACK FILLING INS

JL

CV

0

11‐Sep‐18

25‐Sep‐18

11‐Sep‐18

25‐Sep‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

7.40 EXCAVATION / Blinidng

JL

CV

60

12‐Jun‐18

05‐Jul‐18

12‐Jun‐18

05‐Jul‐18

0.03%

0.16%

100.000%

100.00%

0.00%

100.00%

100.00% 100.00% Page 95 of 170

0.00%

METERING SKID 445

A1845‐2

INS

CUM

60

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

446 447

A1890 A1890‐1

7.40 FOUNDATION WORK  (STEEL FIXING) 7.40 FOUNDATION WORK  (CONCRETE)

INS INS

JL JL

CV CV

CUM CUM

1656 14.55

1656 14.55

03‐Jul‐18 09‐Jul‐18

31‐Jul‐18 05‐Aug‐18

03‐Jul‐18 09‐Jul‐18

31‐Jul‐18 05‐Aug‐18

0.02% 0.02%

0.11% 0.11%

100.000% 100.000%

100.00% 100.00%

0.00% 0.00%

100.00% 100.00%

100.00% 100.00%

100.00% 100.00%

0.00% 0.00%

448

A1890‐3

7.40 CURING / WATERPROOFING / BACK FILLING INS

JL

CV

CUM

108

108

08‐Aug‐18

27‐Sep‐18

08‐Aug‐18

27‐Sep‐18

0.02%

0.11%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

0.03%

0.16%

100.000%

98.00%

‐25.00%

98.00%

75.00%

98.00%

23.00%

0.01% 0.02% 0.03%

0.05% 0.10% 0.16%

100.000% 100.000% 100.000%

100.00% 80.00% 55.00%

‐27.81% ‐27.81% ‐53.06%

100.00% 84.00% 75.00%

72.19% 72.19% 46.94%

100.00% 84.00% 75.00%

27.81% 11.81% 28.06%

0.03%

0.16%

100.000%

30.00%

‐62.89%

60.00%

37.11%

60.00%

22.89%

PIPE SUPPORT 450

A1845‐3

451 452 453

A1870‐1 A1870‐1 A1870‐2

454

A1870‐3

EXCAVATION FOR STRUCTURAL STEEL PIPE  SUPPORTS XX 7.40 FOUNDATION WORK  (STEEL FIXING) XX 7.40 FOUNDATION WORK  (STEEL FIXING) 7.40 FOUNDATION WORK  (CONCRETE)

INS

JL

CV

CUM

50

49

03‐Aug‐18

22‐Nov‐18

03‐Aug‐18

INS INS INS

JL JL JL

CV CV CV

CUM CUM CUM

4200 4200 35

4200 3528 26.25

09‐Jul‐18 09‐Jul‐18 10‐Sep‐18

06‐Dec‐18 06‐Dec‐18 16‐Dec‐18

09‐Jul‐18 06‐Aug‐18 10‐Sep‐18

7.40 CURING / WATERPROOFING / BACK FILLING INS

JL

CV

CUM

76

45.6

20‐Sep‐18

25‐Dec‐18

20‐Sep‐18

7.40 7.40 7.40 7.40 7.40

INS INS INS INS INS

JL JL JL JL JL

CV CV CV CV CV

CUM CUM CUM CUM CUM

30 70 3647 3647 26

30 70 3647 3647 26

05‐Jun‐18 05‐Jun‐18 09‐Jul‐18 09‐Jul‐18 16‐Aug‐18

06‐Sep‐18 06‐Sep‐18 13‐Sep‐18 13‐Sep‐18 16‐Sep‐18

05‐Jun‐18 05‐Jun‐18 09‐Jul‐18 09‐Jul‐18 16‐Aug‐18

19‐Jul‐18 06‐Sep‐18 19‐Jul‐18 13‐Sep‐18 16‐Sep‐18

0.01% 0.02% 0.00% 0.00% 0.01%

0.05% 0.11% 0.01% 0.02% 0.03%

100.000% 100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%

100.00% 100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%

7.40 CURING / WATERPROOFING / BACK FILLING INS

JL

CV

CUM

206

206

03‐Sep‐18

03‐Oct‐18

03‐Sep‐18

03‐Oct‐18

0.01%

0.03%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

JL

STIN

Kg

9298

464.9

07‐Oct‐18

09‐Jan‐19

07‐Oct‐18

0.10%

0.45%

60.000%

5.00%

‐40.00%

5.00%

20.00%

5.00%

‐15.00%

INS

JL

STIN

PCS

151

0

01‐Jan‐19

09‐Jan‐19

0.02%

0.11%

18.182%

0.00%

‐18.18%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL OF  7.40 METERING SKID INCL. WALK WAY OR CROSS  INS OVER

JL

STIN

Kg

2470

0

01‐Jan‐19

14‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

7.40

19‐Jul‐18

PSV 456 457 458 459 460

A1845‐4 A1845‐4 A1890‐4 A1890‐4 A1890‐5

461

A1890‐6

XX XX XX XX

EXCAVATION EXCAVATION FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE)

Structural Steel TEST SEPERATOR 464

A2540

INSTALLATION OF STRUCTURAL STEELWORK  7.40 OPERATINGNDCCESS PLATFORMS (TEST  INS SEPERATOR & PLATFORM)

465

A2580

7.40

INSTALLATION OF LADDERS, STAIRS,  HANDRAILS

METERING SKID 467

A2550

PSV 469

A2560

INSTALLATION OF PSV VALVESCCESS  PLATFORMS

INS

JL

STIN

Kg

1705

0

01‐Jan‐19

14‐Jan‐19

0.01%

0.06%

18.182%

0.00%

‐18.18%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL PIPE  7.40 SUPPORTS & MODIFICATIONS OF  EXISTINGCCESS PLATFORMS (IFPPLICABLE)

INS

JL

STIN

Kg

4078

0

27‐Dec‐18

14‐Jan‐19

0.01%

0.03%

15.000%

0.00%

‐15.00%

0.00%

0.00%

0.00%

0.00%

7.40 INSTALLATION OF INSTRUMENT STANCHION INS

JL

STIN

0

10‐Jan‐19

14‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

7.10 INSTALLATION OF NEW TEST SEPARATOR

INS

JL

ME

137.5

10‐Sep‐18

14‐Oct‐18

0.02%

0.10%

100.000%

50.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS

JL

HTAP

0

10‐Feb‐19

12‐Feb‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

HTAP

0

12‐Feb‐19

19‐Feb‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

HTAP

0

19‐Feb‐19

28‐Feb‐19

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

HTAP

0

24‐Feb‐19

28‐Feb‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

PPIN

0

04‐Mar‐19

05‐Mar‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

PPIN

0

05‐Mar‐19

11‐Mar‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS

JL JL

PPIN PPIN

0 0

21‐Feb‐19 05‐Mar‐19

28‐Feb‐19 15‐Mar‐19

0.04% 0.01%

0.18% 0.06%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0

01‐Jan‐19

06‐Feb‐19

0.10%

0.48%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

27‐Jan‐19

05‐Feb‐19

0.05%

0.24%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

06‐Mar‐19

11‐Mar‐19

0.10%

0.48%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

7.40

PIPE SUPPORT 471

A2570

FIELD INSTRUMENT 473

A2570‐1

Mechanical 475

A2835

SET

137.5

10‐Sep‐18

14‐Oct‐18

Piping HOT TAPPING 478 479 480 481

483 484 485 486

MOBILIZATION OF HOT TAPPING SUB  CONTRACTOR SCAFFOLDING / PLATE FORM / WORK  HT1090 7.10 PERMIT ISSUE HT1100 7.10 FLARE TAPPING / NDT FLARE TAPPING COMPLETE / REMOVE  HT1110 7.10 SCAFFOLD Pre Shutdownnd Plant Shutdown Tie‐in A3100‐2 7.10 MOBILIZATION OF OF TEAMPPLY PTW SCAFFOLDING / PLATE FORM / WORK  A3100‐3 7.10 PERMIT ISSUE A3100‐4 7.10 PIPING TIE‐IN / NDT PRE SHUT DOWN A3100‐5 7.10 PIPING TIE‐IN / NDT SHUT DOWN PIPING ‐REMAINING HT1080

7.10

PIPING INSTALLATION ON PIPE  SUPPORT,PIERACK &ROUND EQUIPMENT

488

A3070

7.10

INS

JL

PPIN

489

A3070‐1

7.10 INSTALLATION OF BALL VALVE & GGC VALVE INS

JL

PPIN

INS

JL

PPIN

INS

JL

PPIN

SET

240

0

07‐Feb‐19

20‐Feb‐19

0.05%

0.24%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

PPIN

PCS

2151.6

0

05‐Mar‐19

11‐Mar‐19

0.07%

0.34%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

PPIN

PCS

66

0

09‐Mar‐19

11‐Mar‐19

0.01%

0.05%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS

JL JL JL

EL EL EL

LM NO LM

500 3 292.6

0 0 0

25‐Nov‐18 04‐Dec‐18 10‐Jan‐19

23‐Dec‐18 10‐Dec‐18 19‐Jan‐19

0.00% 0.00% 0.01%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

490

A3080

7.10

491

A3090

7.10

492

A3100

7.10

493

A3101

7.10

INLET PIPING  TIE‐IN TO SEPARATOR  (PARTIAL SHUTDOWN TIE‐IN) HYDRO‐TESTING, FLUSHING, DRAININGND  PURGING TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN  TIE‐IN / INSTALL SDV

DIN

DIN

446

446

0.000%

Electrical 495 496 495

A6180 A6190 A3560

7.40 CABLE TRENCH 7.30 EARTH PIT DRILLING 7.30 CABLE TRAY INSTALLATION

0.00% 0.02% 0.05%

0.000% 0.000% 0.000%

Page 96 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

JL JL

3963‐ DISC

U.M.

Qty

EL EL

LM LM

275 243.1

PCS

496 497

A3550 A3580

7.30 U/G CABLE LAYING 7.30 CABLE LAYING

498

A3570

7.30 ELECTRICAL EQUIPMENTS INSTALLATION

INS

JL

EL

499 500

A3550‐1 A3540

7.30 BACK FILLING OF CABLE TRENCH 7.30 CABLE GLANDND TERMINATION

INS INS

JL JL

EL EL

501

A3590

7.30 LIGHTING FIXTUREND DB INSTALLATION

INS

JL

EL

502 503 504

A3580‐1 A3600 A3610

INS INS INS

JL JL JL

EL EL EL

7.30 HOOK UP 7.30 ELECTRICAL TIE‐INS 7.30 ENERGIZATION Instrument & Control

INS INS

3963‐ AREA

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

0 0

12‐Jan‐19 15‐Jan‐19

26‐Jan‐19 06‐Feb‐19

0.04% 0.04%

0.20% 0.18%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

83.6

0

03‐Feb‐19

16‐Feb‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

LM

116.6

0 0

26‐Jan‐19 05‐Feb‐19

09‐Feb‐19 16‐Feb‐19

0.02% 0.02%

0.07% 0.09%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

PCS

198

0

10‐Feb‐19

16‐Feb‐19

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

SET SET

44 44

0 0 0

17‐Feb‐19 20‐Feb‐19 26‐Feb‐19

20‐Feb‐19 26‐Feb‐19 02‐Mar‐19

0.02% 0.01% 0.01%

0.07% 0.03% 0.03%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

LM

36.3

0

29‐Dec‐18

16‐Jan‐19

0.02%

0.08%

20.000%

0.00%

‐20.00%

0.00%

0.00%

0.00%

0.00%

16‐Jan‐19 20‐Jan‐19 12‐Jan‐19

19‐Jan‐19 22‐Jan‐19 31‐Jan‐19

0.00% 0.00% 0.02%

0.01% 0.01% 0.08%

20.000% 0.000% 0.000%

0.00% 0.00% 0.00%

‐20.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

506

A4100

7.20 CABLE TRAYND SUPPORT INSTALLATION

INS

JL

IN

506 507 507

A4540 A4880 A4130

7.20 JB SUPPORT INSTALLATION 7.20 JB INSTALLATION 7.20 INSTRUMENT CABLE LAYING

INS INS INS

JL JL JL

IN IN IN

LM

1672

0 0 0

508

A4120

7.20 INSTRUMENT EQUIPEMNT INSTALLATION

INS

JL

IN

SET

317.9

0

24‐Jan‐19

16‐Feb‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

IN

0

30‐Jan‐19

19‐Feb‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

IN

0

14‐Feb‐19

16‐Feb‐19

0.02%

0.10%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

7.20 CABLE GLANDND TERMINATION (ALONG JB) INS

JL

IN

0

31‐Jan‐19

06‐Feb‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

IN

0

19‐Feb‐19

25‐Feb‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

IN

0

20‐Feb‐19

25‐Feb‐19

0.02%

0.10%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS

JL JL JL

IN IN IN

SET

605

0 0 0

12‐Feb‐19 19‐Feb‐19 21‐Feb‐19

20‐Feb‐19 24‐Feb‐19 25‐Feb‐19

0.02% 0.06% 0.06%

0.10% 0.31% 0.31%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

INS

JL

IN

SET

154

0

25‐Feb‐19

02‐Mar‐19

0.09%

0.41%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS

JL JL JL JL JL

IN IN IN IN IN

0 0 0 0 0

12‐Jan‐19 13‐Jan‐19 15‐Jan‐19 20‐Jan‐19 22‐Jan‐19

21‐Jan‐19 16‐Jan‐19 19‐Jan‐19 21‐Jan‐19 23‐Jan‐19

0.00% 0.00% 0.00% 0.00% 0.00%

0.01% 0.01% 0.01% 0.01% 0.01%

20.000% 20.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00%

‐20.00% ‐20.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

509

A4120‐1

510

A4120‐3

508

A4120‐11

FIELD INSTRUMENT INSTALLATION  7.20 (GAUGESND TRANSMITTER) INSTALLATION OF BS & WNALYZERS ON  7.20 METERING SKID

509

A4120‐21

7.20

511

A4140

7.20

512 513 514

A5310 A4120‐2 A4130‐1

7.50 7.20 7.20

515

A4110

7.20

CABLE GLANDND TERMINATION (ALONG  INSTRUMENT) DCS INSTALLATION IN CONTROL ROOM BY  VENDOR INSTALLATION OF  DELUGE  INSTALLATION OF INSTRUMENT VALVE SS TUBEND LEAK TEST INSTRUMENT EQUIPMENT CALIBRATION /  LOOP TEST

F&G System 506 506 507 507 508

A6230 A6200 A6210 A6220 A6240

7.50 7.50 7.50 7.50 7.50

F&G CABLE INSTALLATION F&G SUPPORT INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION

509

A6250

7.50 F&G CABLE GLANDINGND TERMINATION

510 508

7.50 F&G LOOP PREPARATION 7.50 F&G LOOP TESTING Painting & Fireproofing

INS

JL

IN

0

21‐Feb‐19

25‐Feb‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

A6260 A6270

INS INS

JL JL

IN IN

0 0

26‐Feb‐19 27‐Feb‐19

27‐Feb‐19 02‐Mar‐19

0.00% 0.00%

0.01% 0.01%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

517

A4390

7.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS

JL

FP

SQM

203

0

06‐Feb‐19

20‐Feb‐19

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

518

A4400

7.10 PIPING PAINTINGND TOUCH‐UP

INS

JL

FP

SQM

302

0

06‐Feb‐19

20‐Feb‐19

0.05%

0.22%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

519

A4410

7.50 FIREPROOFING FOR STRUCTURAL STEEL

INS

JL

FP

SQM

1037.3

0

06‐Feb‐19

25‐Feb‐19

0.16%

0.76%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

JL

DEM

PCS

8.8

0

03‐Apr‐19

06‐Apr‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

DEPRESSURIZATION / ISOLATION (PIPING &  INS INSTRUMENTATION)

JL

DEM

PCS

80.96

0

07‐Apr‐19

09‐Apr‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Demolition Works 521

DM1140

7.60 WORK PERMITPPROVED FOR DEMOLITION

522

DM1150

7.60

523

DM1170

7.60 APPLYNTI RUST TO FOUNDATION BOTLS

INS

JL

DEM

PCS

40.48

0

09‐Apr‐19

10‐Apr‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

524

DM1160

7.60 COLD CUTTING INLETND OUTLET PIPING

INS

JL

DEM

PCS

80.96

0

10‐Apr‐19

06‐May‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

525

DM1180

7.60 UNBOLD & REMOVE EXISTING SEPARATOR

INS

JL

DEM

PCS

283.36

0

06‐May‐19

08‐May‐19

0.04%

0.21%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

526

DM1190

7.60

REMOVE CONCRETE FOUNDATION / GRADE  INS THEREA

JL

DEM

PCS

333

0

08‐May‐19

26‐May‐19

0.05%

0.25%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

SQM

239.8

239.8

08‐Apr‐18

14‐Apr‐18

08‐Apr‐18

0.04%

0.17%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

0

10‐Sep‐18

10‐Dec‐18

10‐Sep‐18

0.00%

0.00%

100.000%

90.00%

0.00%

90.00%

50.00%

90.00%

40.00%

166.32

10‐Sep‐18

10‐Dec‐18

10‐Sep‐18

0.03%

0.14%

100.000%

35.00%

0.00%

45.00%

50.00%

45.00%

‐5.00%

0

05‐Sep‐18

10‐Dec‐18

05‐Sep‐18

0.03%

0.14%

100.000%

55.00%

0.00%

65.00%

52.58%

65.00%

12.42%

0.00%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

FAHS Civil Works COMMOMN 530

A1960

6.40 GRADING

INS

FS

CV

531

A1960‐1

6.40 PROTECTION OF UNDERGROUND CABLES

INS

FS

CV

532

A2030

6.40

CABLE TRENCHESND UTILITY ROAD  CROSSINGS

INS

FS

CV

533

A1965‐5

SOAKWAY PIT EXCAVATION & INSTALLATION  INS 6.40 INCL. DEMOLITION ‐  IFPPLICABLE

FS

CV

534

A2040

INS

FS

CV

LM

4.95

0

11‐Dec‐18

21‐Jan‐19

0.00%

535

A2020

INS

FS

CV

SQM

57.75

0

04‐Apr‐19

20‐Apr‐19

0.01%

6.40 DRAINAGE PIPE CULVERTS ROADSND PAVING(INCLUDING  6.40 MODIFICATIONS)

PCS

369.6

14‐Apr‐18

Page 97 of 170

Sr.no. Activity ID XX 536 537

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

A2050

6.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS

FS

CV

PCS

66

0

18‐Apr‐19

02‐May‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

A2080

RE‐INSTATEMENT OF EXISTING PAVEMENT  6.40 (INTERLOCK PAVING)

FS

CV

SQM

25.85

0

02‐May‐19

16‐May‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

TEST SEPERATOR 539

A1965

FS

CV

CUM

40

40

08‐Apr‐18

04‐May‐18

08‐Apr‐18

04‐May‐18

0.04%

0.17%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

540 541 542

A1970 A1970‐1 A1970‐1

6.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS 6.40 FOUNDATION WORK  (STEEL FIXING) XX 6.40 FOUNDATION WORK  (CONCRETE) XX 6.40 FOUNDATION WORK  (CONCRETE)

INS INS INS

FS FS FS

CV CV CV

CUM CUM CUM

1534 15.8 15.8

1534 15.8 15.8

02‐Jun‐18 02‐Jun‐18 02‐Jun‐18

05‐Jul‐18 19‐Jul‐18 19‐Jul‐18

02‐Jun‐18 02‐Jun‐18 02‐Jun‐18

05‐Jul‐18 19‐Jul‐18 20‐Jul‐18

0.03% 0.03% 0.00%

0.13% 0.12% 0.02%

100.000% 100.000% 100.000%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

100.00% 100.00% 100.00%

0.00% 0.00% 0.00%

543

A1970‐2

XX 6.40 CURING / WATERPROOFING / BACK FILLING INS

FS

CV

CUM

45

45

19‐Jul‐18

13‐Sep‐18

19‐Jul‐18

19‐Jul‐18

0.01%

0.04%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

544

A1970‐2

XX 6.40 CURING / WATERPROOFING / BACK FILLING INS

FS

CV

CUM

45

45

19‐Jul‐18

13‐Sep‐18

19‐Jul‐18

13‐Sep‐18

0.00%

0.02%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

09‐Oct‐18

TEST SEPERATOR PLATFORM 546

A1965‐1

6.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

FS

CV

0

01‐Aug‐18

09‐Oct‐18

01‐Aug‐18

0.00%

0.02%

100.000%

95.00%

0.00%

100.00%

100.00%

100.00%

0.00%

547 548

A1970‐3 A1970‐4

6.40 FOUNDATION WORK  (STEEL FIXING) 6.40 FOUNDATION WORK  (CONCRETE)

INS INS

FS FS

CV CV

0 0

22‐Aug‐18 03‐Sep‐18

06‐Dec‐18 16‐Dec‐18

22‐Aug‐18 03‐Sep‐18

0.00% 0.00%

0.02% 0.02%

100.000% 100.000%

90.00% 45.00%

0.00% 0.00%

97.00% 75.00%

60.75% 50.48%

97.00% 75.00%

36.25% 24.52%

549

A1970‐5

6.40 CURING / WATERPROOFING / BACK FILLING INS

FS

CV

0

16‐Sep‐18

25‐Dec‐18

16‐Sep‐18

0.00%

0.02%

100.000%

25.00%

0.00%

60.00%

39.60%

60.00%

20.40%

A2010‐1

6.40 6.40 6.40 6.40 6.40

INS INS INS INS INS

FS FS FS FS FS

CV CV CV CV CV

CUM CUM CUM CUM CUM

62.91 62.91 1656 1656 14.55

62.91 62.91 1656 1656 14.55

14‐Apr‐18 14‐Apr‐18 09‐Jul‐18 09‐Jul‐18 15‐Aug‐18

21‐Jul‐18 21‐Jul‐18 10‐Sep‐18 10‐Sep‐18 24‐Sep‐18

14‐Apr‐18 14‐Apr‐18 09‐Jul‐18 09‐Jul‐18 15‐Aug‐18

0.04% 0.02% 0.01% 0.02% 0.02%

0.17% 0.09% 0.04% 0.08% 0.09%

100.000% 100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%

100.00% 100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00% 0.00%

A2010‐2

6.40 CURING / WATERPROOFING / BACK FILLING INS

FS

CV

CUM

108

97.2

11‐Sep‐18

01‐Dec‐18

11‐Sep‐18

0.02%

0.09%

100.000%

65.00%

0.00%

90.00%

54.88%

90.00%

35.12%

FS

CV

CUM

50

50

18‐Jul‐18

24‐Nov‐18

18‐Jul‐18

0.00%

0.00%

100.000%

100.00%

‐23.08%

100.00%

76.92%

100.00%

23.08%

0.03%

0.17%

100.000%

88.00%

0.00%

95.00%

76.92%

95.00%

18.08%

0.02% 0.02% 0.04%

0.12% 0.08% 0.19%

100.000% 100.000% 100.000%

100.00% 30.00% 10.00%

‐49.40% ‐49.40% ‐63.89%

100.00% 65.00% 33.00%

50.60% 50.60% 36.11%

100.00% 65.00% 33.00%

49.40% 14.40% ‐3.11%

0.04%

0.19%

100.000%

10.00%

‐66.67%

33.00%

33.33%

33.00%

‐0.33%

0.04% 0.01% 0.00% 0.00% 0.01%

0.17% 0.03% 0.02% 0.01% 0.03%

100.000% 100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 95.00% 100.00% 90.00%

0.00% ‐12.80% ‐12.80% ‐24.14% ‐24.14%

100.00% 100.00% 95.00% 100.00% 90.00%

100.00% 87.20% 87.20% 75.86% 75.86%

100.00% 100.00% 95.00% 100.00% 90.00%

0.00% 12.80% 7.80% 24.14% 14.14%

0.01%

0.04%

100.000%

90.00%

‐50.52%

90.00%

49.48%

90.00%

40.52%

551 552 553 554 555 556

METERING SKID A1965‐2 XX A1965‐2 XX A2010 XX A2010 XX

EXCAVATION EXCAVATION FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE)

21‐Jun‐18 21‐Jul‐17 19‐Jul‐18 10‐Sep‐18 24‐Sep‐18

PIPE SUPPORT 558

A1965‐3

XX 6.40

559

A1965‐3

XX 6.40

560 561 562

A1990 A1990 A1990‐1

XX 6.40 XX 6.40 6.40

563

A1990‐2

EXCAVATION FOR STRUCTURAL STEEL PIPE  SUPPORTS EXCAVATION FOR STRUCTURAL STEEL PIPE  SUPPORTS FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE)

INS

19‐Jul‐18

INS

FS

CV

CUM

50

47.5

18‐Jul‐18

24‐Nov‐18

18‐Jul‐18

INS INS INS

FS FS FS

CV CV CV

CUM CUM CUM

4200 4200 35

4200 2730 11.55

14‐Sep‐18 14‐Sep‐18 30‐Sep‐18

05‐Dec‐18 05‐Dec‐18 10‐Dec‐18

10‐Jun‐18 14‐Sep‐18 30‐Sep‐18

6.40 CURING / WATERPROOFING / BACK FILLING INS

FS

CV

CUM

76

25.08

03‐Oct‐18

10‐Dec‐18

03‐Oct‐18

6.40 6.40 6.40 6.40 6.40

INS INS INS INS INS

FS FS FS FS FS

CV CV CV CV CV

CUM CUM CUM CUM CUM

100 3647 3647 26 26

100 3647 3464.65 26 23.4

21‐May‐18 05‐Jun‐18 05‐Jun‐18 08‐Jul‐18 08‐Jul‐18

08‐Aug‐18 15‐Nov‐18 15‐Nov‐18 29‐Nov‐18 29‐Nov‐18

21‐May‐18 05‐Jun‐18 05‐Jun‐18 08‐Jul‐18 08‐Jul‐18

6.40 CURING / WATERPROOFING / BACK FILLING INS

FS

CV

CUM

206

185.4

08‐Sep‐18

13‐Dec‐18

08‐Sep‐18

FS

STIN

Kg

9298

0

30‐Dec‐18

17‐Jan‐19

0.11%

0.51%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FS

STIN

PCS

151

0

08‐Jan‐19

17‐Jan‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL OF  6.40 METERING SKID INCL. WALK WAY OR CROSS  INS OVER

FS

STIN

Kg

2470

0

31‐Dec‐18

20‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

19‐Jul‐18

PSV 565 566 567 568 569

A1965‐4 A2010‐3 A2010‐3 A2010‐4 A2010‐4

570

A2010‐5

XX XX XX XX

EXCAVATION FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE) FOUNDATION WORK  (CONCRETE)

08‐Aug‐18 19‐Jul‐18 28‐Oct‐18 19‐Jul‐18 31‐Oct‐18

Structural Steel TEST SEPERATOR 573

A2600

INSTALLATION OF STRUCTURAL STEELWORK  6.40 OPERATINGNDCCESS PLATFORMS (TEST  INS SEPERATOR & PLATFORM)

574

A2640

6.40

INSTALLATION OF LADDERS, STAIRS,  HANDRAILS

METERING SKID 576

A2610

PSV 578

A2620

INSTALLATION OF PSV VALVESCCESS  PLATFORMS

INS

FS

STIN

Kg

1705

0

16‐Dec‐18

24‐Dec‐18

0.01%

0.07%

18.182%

0.00%

‐18.18%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL PIPE  6.40 SUPPORTS & MODIFICATIONS OF  EXISTINGCCESS PLATFORMS (IFPPLICABLE)

INS

FS

STIN

Kg

4078

0

20‐Dec‐18

21‐Jan‐19

0.01%

0.03%

10.000%

0.00%

‐10.00%

0.00%

0.00%

0.00%

0.00%

6.40 INSTALLATION OF INSTRUMENT STANCHION INS

FS

STIN

0

28‐Jan‐19

02‐Feb‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6.10 INSTALLATION OF NEW TEST SEPARATOR

INS

FS

ME

137.5

06‐Oct‐18

08‐Oct‐18

0.02%

0.10%

100.000%

0.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS

FS

HTAP

0

28‐Feb‐19

03‐Mar‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6.40

PIPE SUPPORT 580

A2630

FIELD INSTRUMENT 582

A2630‐1

Mechanical 584

A2855

SET

137.5

06‐Oct‐18

08‐Oct‐18

Piping HOT TAPPING 587

HT1120

6.10

MOBILIZATION OF HOT TAPPING SUB  CONTRACTOR

Page 98 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

588

HT1130

FS

HTAP

0

03‐Mar‐19

12‐Mar‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

HT1140

SCAFFOLDING / PLATE FORM / WORK  PERMIT ISSUE 6.10 FLARE TIE‐IN / NDT

INS

589

INS

FS

HTAP

0

13‐Mar‐19

27‐Mar‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

590

HT1150

6.10 HOT TIE‐IN COMPLETE / REMOVE SCAFFOLD INS

FS

HTAP

0

09‐Apr‐19

22‐Apr‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS

FS FS

PPIN PPIN

0 0

30‐Mar‐19 30‐Mar‐19

30‐Mar‐19 15‐Apr‐19

0.01% 0.01%

0.03% 0.03%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

INS

FS

PPIN

0

31‐Mar‐19

08‐Apr‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FS

PPIN

0

15‐Apr‐19

22‐Apr‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

23‐Dec‐18

03‐Feb‐19

0.07%

0.34%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

15‐Jan‐19

24‐Jan‐19

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

240

0

29‐Jan‐19

12‐Feb‐19

0.07%

0.34%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

592 593 594 595

6.10

Pre Shutdownnd Plant Shutdown Tie‐in A3150‐000 6.10 MOBILIZATION OF OF TEAMPPLY PTW A3150‐1 6.10 PIPING TIE‐IN / NDT PRE SHUT DOWN SCAFFOLDING / PLATE FORM / WORK  A3150‐00 6.10 PERMIT ISSUE A3150‐2 6.10 PIPING TIE‐IN / NDT SHUT DOWN PIPING ‐REMAINING PIPING INSTALLATION ON PIPE  SUPPORT,PIERACK &ROUND EQUIPMENT

597

A3120

6.10

INS

FS

PPIN

598

A3120‐1

6.10 INSTALLATION OF BALL VALVE & GGC VALVE INS

FS

PPIN

599

A3140

6.10

INS

FS

PPIN

SET

600

A3130

6.10

INS

FS

PPIN

DIN

335

0

29‐Jan‐19

03‐Feb‐19

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

601

A3150

6.10

INS

FS

PPIN

PCS

1412.4

0

29‐Jan‐19

03‐Feb‐19

0.05%

0.24%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

602

A3151

6.10

INS

FS

PPIN

PCS

66

0

31‐Jan‐19

03‐Feb‐19

0.01%

0.05%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS INS INS

FS FS FS FS FS FS FS

EL EL EL EL EL EL EL

LM NO LM LM

500 3 301.4 319

LM LM

259.6 123.2

0 0 0 0 0 0 0

10‐Sep‐18 20‐Dec‐18 20‐Dec‐18 03‐Jan‐19 10‐Jan‐19 23‐Dec‐18 30‐Dec‐18

10‐Dec‐18 24‐Dec‐18 08‐Jan‐19 10‐Jan‐19 27‐Jan‐19 08‐Jan‐19 12‐Jan‐19

0.00% 0.00% 0.01% 0.05% 0.02% 0.04% 0.02%

0.00% 0.02% 0.05% 0.23% 0.07% 0.19% 0.09%

100.000% 40.000% 100.000% 40.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

‐50.00% ‐40.00% ‐100.00% ‐40.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

50.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

‐50.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

EL

PCS

110

0

30‐Dec‐18

12‐Jan‐19

0.02%

0.08%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

PCS

253

0

05‐Jan‐19

12‐Jan‐19

0.04%

0.19%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

SET SET

44 44

0 0 0

12‐Jan‐19 16‐Jan‐19 17‐Jan‐19

16‐Jan‐19 17‐Jan‐19 21‐Jan‐19

0.02% 0.01% 0.01%

0.07% 0.03% 0.03%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

LM

36.3

LM

1117.6

0 0 0 0

05‐Jan‐19 17‐Jan‐19 22‐Jan‐19 17‐Jan‐19

21‐Jan‐19 21‐Jan‐19 26‐Jan‐19 05‐Feb‐19

0.01% 0.00% 0.00% 0.01%

0.06% 0.01% 0.01% 0.06%

0.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0

27‐Jan‐19

31‐Jan‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

HYDRO‐TESTING, FLUSHING, DRAININGND  PURGING INLET PIPING  TIE‐IN TO SEPARATOR  (PARTIAL SHUTDOWN TIE‐IN) TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN  TIE‐IN / INSTALL SDV

DIN

335

0.000%

Electrical 604 605 604 605 606 607 608

A6520 A3920 A3650 A3640 A3640‐1 A3670 A3630

6.40 6.30 6.30 6.30 6.30 6.30 6.30

CABLE TRENCH EARTH PIT DRILLING CABLE TRAY INSTALLATION U/G CABLE LAYING BACK FILLING OF CABLE TRENCH CABLE LAYING CABLE GLADND TERMINATION

609

A3660

6.30 ELECTRICAL EQUIPMENTS INSTALLATION

INS

FS

610

A3680

6.30 LIGHTING FIXTUREND DB INSTALLATION

611 612 613

A3670‐1 A3690 A3700

INS

FS

EL

HOOK UP ELECTRICAL TIE‐INS ENERGIZATION

INS INS INS

FS FS FS

EL EL EL

CABLE TRAY/DUCT INSTALLATION JB SUPPORT INSTALLATION JB INSTALLATION INSTRUMENT CABLE LAYING

INS INS INS INS

FS FS FS FS

IN IN IN IN

FS

IN

615 615 616 616

6.30 6.30 6.30 Instrument & Control A4150 6.20 A3710 6.20 A3810 6.20 A4180 6.20

617

A3900

6.20 CABLE GLANDND TERMINATION (ALONG JB) INS

617

A4170

6.20 INSTRUMENT EQUIPEMNT INSTALLATION

618

A4170‐2

6.20

619

A4170‐3

6.20

618

A3910

6.20

620

A4190

6.20

621 622

A4170‐1 A5320

6.20 6.50

623

A4160

6.20

624

A4180‐1

INS

FS

IN

0

02‐Feb‐19

20‐Feb‐19

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FS

IN

0

02‐Feb‐19

20‐Feb‐19

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FS

IN

0

18‐Feb‐19

20‐Feb‐19

0.02%

0.08%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FS

IN

0

20‐Feb‐19

25‐Feb‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

6.20

FIELD INSTRUMENT INSTALLATION  (GAUGESND TRANSMITTER) INSTALLATION OF BS & WNALYZERS ON  METERING SKID CABLE GLANDND TERMINATION (ALONG  INSTRUMENTS) DCS MODIFICATIOM IN CONTROL ROOM BY  VENDOR INSTALLATION OF INSTRUMENT VALVE INSTALLATION OF  DELUGE  INSTRUMENT EQUIPMENT CALIBRATION /  LOOP TEST SS TUBEND LEAK TEST

INS

F&G SUPPORT INSTALLATION F&G CABLE INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION

INS INS INS INS INS

FS FS FS FS FS

SET

306.9

INS

FS

IN

0

24‐Feb‐19

02‐Mar‐19

0.02%

0.08%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS

FS FS

IN IN

SET

451

0 0

14‐Feb‐19 16‐Feb‐19

20‐Feb‐19 20‐Feb‐19

0.03% 0.02%

0.15% 0.11%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

FS

IN

SET

147.4

0

05‐Mar‐19

11‐Mar‐19

0.05%

0.23%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

FS

IN

0

02‐Mar‐19

05‐Mar‐19

0.06%

0.30%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

IN IN IN IN IN

0 0 0 0 0

17‐Jan‐19 17‐Jan‐19 21‐Jan‐19 22‐Jan‐19 27‐Jan‐19

21‐Jan‐19 27‐Jan‐19 24‐Jan‐19 23‐Jan‐19 28‐Jan‐19

0.00% 0.00% 0.00% 0.00% 0.00%

0.01% 0.01% 0.01% 0.01% 0.01%

0.000% 0.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

F&G System 615 615 616 616 617

A6290 A6280 A6300 A6310 A6320

6.50 6.50 6.50 6.50 6.50

617

A6330

6.50 F&G CABLE GLANDINGND TERMINATION

618 619

A6340 A6350

INS

FS

IN

0

20‐Feb‐19

25‐Feb‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS

FS FS

IN IN

0 0

25‐Feb‐19 03‐Mar‐19

27‐Feb‐19 05‐Mar‐19

0.00% 0.00%

0.01% 0.01%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

626

6.50 F&G LOOP PREPARATION 6.50 F&G LOOP TESTING Painting & Fireproofing A4430 6.10 PIPING PAINTINGND TOUCH‐UP

INS

FS

FP

SQM

241

0

29‐Jan‐19

12‐Feb‐19

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

627

A4440

6.50 FIREPROOFING FOR STRUCTURAL STEEL

INS

FS

FP

SQM

1146.2

0

02‐Feb‐19

02‐Mar‐19

0.18%

0.84%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

628

A4420

6.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS

FS

FP

SQM

237

0

27‐Jan‐19

09‐Feb‐19

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Demolition Works

Page 99 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

DM1210

6.60 WORK PERMITPPROVED FOR DEMOLITION

INS

FS

DEM

PCS

8.8

0

18‐May‐19

20‐May‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

631

DM1220

DEPRESSURIZATION / ISOLATION (PIPING &  INS 6.60 INSTRUMENTATION)

FS

DEM

PCS

47.52

0

21‐May‐19

22‐May‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

632

DM1240

6.60 APPLYNTI RUST TO FOUNDATION BOTLS

INS

FS

DEM

PCS

23.76

0

22‐May‐19

23‐May‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

633

DM1230

6.60 COLD CUTTING INLETND OUTLET PIPING

INS

FS

DEM

PCS

47.52

0

23‐May‐19

16‐Jun‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

634

DM1250

6.60 UNBOLD & REMOVE EXISTING SEPARATOR

INS

FS

DEM

PCS

166.32

0

16‐Jun‐19

18‐Jun‐19

0.03%

0.12%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

635

DM1260

6.60

REMOVE CONCRETE FOUNDATION / GRADE  INS THEREA

FS

DEM

PCS

199

0

18‐Jun‐19

01‐Jul‐19

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

SQM

338.8

630

FAHN Civil Works COMMOMN 639

A2090

4.40 GRADING

INS

FN

CV

338.8

05‐May‐18

10‐May‐18

05‐May‐18

0.05%

0.24%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

640

A2090‐1

4.40 PROTECTION OF UNDERGROUND CABLES

INS

FN

CV

0

13‐Aug‐18

24‐Dec‐18

13‐Aug‐18

10‐May‐18

0.00%

0.00%

0.000%

80.00%

55.22%

80.00%

55.22%

80.00%

24.78%

641

A2095‐00

4.40

SOAKWAY PIT EXCAVATION & INSTALLATION  INS INCL. DEMOLITION ‐  IFPPLICABLE

FN

CV

0

18‐Sep‐18

07‐Nov‐18

12‐Sep‐18

0.01%

0.05%

100.000%

50.00%

‐25.49%

55.00%

74.51%

55.00%

‐19.51%

642 643

A2160‐1 A2170

INS INS

FN FN

CV CV

LM

4.587

0 0

08‐Nov‐18 25‐Dec‐18

24‐Dec‐18 06‐Jan‐19

0.01% 0.00%

0.05% 0.00%

42.857% 0.000%

0.00% 0.00%

‐42.86% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

644

A2200

INS

FN

CV

SQM

178.75

0

13‐Apr‐19

28‐Apr‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

645

A2150

INS

FN

CV

SQM

0

0

13‐Apr‐19

28‐Apr‐19

0.01%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

646

A2160

4.40 CABLE TRENCHES 4.40 DRAINAGE PIPE CULVERTS RE‐INSTATEMENT OF EXISTING PAVEMENT  4.40 (INTERLOCK PAVING) ROADSND PAVING(INCLUDING  4.40 MODIFICATIONS) 4.40 UTILITY ROAD CROSSINGS

INS

FN

CV

PCS

211.2

0

16‐Apr‐19

05‐May‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

647

A2180

4.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS

FN

CV

PCS

66

0

21‐Apr‐19

05‐May‐19

0.01%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

FN

CV

CUM

40

40

05‐May‐18

04‐Aug‐18

05‐May‐18

05‐Jul‐18

0.04%

0.18%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

TEST SEPERATOR 649

A2095

XX 4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

650

A2095

XX 4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

FN

CV

CUM

40

40

05‐May‐18

04‐Aug‐18

05‐May‐18

04‐Aug‐18

0.00%

0.02%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

651 652 653 654

A2100 A2100 A2100‐1 A2100‐1

XX XX XX XX

INS INS INS INS

FN FN FN FN

CV CV CV CV

CUM CUM CUM CUM

1534 1534 15.8 15.8

1534 1534 15.8 15.8

03‐Jul‐18 03‐Jul‐18 17‐Jul‐18 17‐Jul‐18

16‐Aug‐18 16‐Aug‐18 23‐Aug‐18 23‐Aug‐18

03‐Jul‐18 03‐Jul‐18 17‐Jul‐18 17‐Jul‐18

19‐Jul‐18 16‐Aug‐18 17‐Jul‐18 23‐Aug‐18

0.02% 0.00% 0.01% 0.00%

0.12% 0.02% 0.06% 0.02%

100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 0.00%

655

A2100‐3

4.40 CURING / WATERPROOFING / BACK FILLING INS

FN

CV

CUM

45

45

05‐Aug‐18

09‐Sep‐18

05‐Aug‐18

09‐Sep‐18

0.00%

0.02%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

4.40 4.40 4.40 4.40

FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE) FOUNDATION WORK  (CONCRETE)

TEST SEPERATOR PLATFORM 657

A2095‐1

4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS

FN

CV

0

28‐Aug‐18

26‐Nov‐18

28‐Aug‐18

0.01%

0.03%

100.000%

50.00%

‐35.16%

84.00%

64.84%

84.00%

19.16%

658 659

A2100‐4 A2100‐5

4.40 FOUNDATION WORK  (STEEL FIXING) 4.40 FOUNDATION WORK  (CONCRETE)

INS INS

FN FN

CV CV

0 0

10‐Oct‐18 22‐Nov‐18

03‐Dec‐18 12‐Dec‐18

10‐Oct‐18

0.01% 0.01%

0.03% 0.03%

100.000% 100.000%

0.00% 0.00%

‐70.91% ‐100.00%

60.00% 0.00%

29.09% 0.00%

60.00% 0.00%

30.91% 0.00%

660

A2140‐125

4.40 CURING / WATERPROOFING / BACK FILLING INS

FN

CV

0

03‐Dec‐18

31‐Dec‐18

0.01%

0.03%

40.000%

0.00%

‐40.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS

FN FN FN FN

CV CV CV CV

CUM CUM CUM CUM

60 1656 1656 14.55

60 1656 1656 14.55

05‐May‐18 04‐Jul‐18 04‐Jul‐18 28‐Aug‐18

07‐Aug‐18 05‐Sep‐18 05‐Sep‐18 28‐Oct‐18

05‐May‐18 04‐Jul‐18 04‐Jul‐18 28‐Aug‐18

0.03% 0.01% 0.02% 0.02%

0.15% 0.04% 0.11% 0.11%

100.000% 100.000% 100.000% 100.000%

100.00% 100.00% 100.00% 98.00%

0.00% 0.00% 0.00% ‐4.84%

100.00% 100.00% 100.00% 100.00%

100.00% 100.00% 100.00% 95.16%

100.00% 100.00% 100.00% 100.00%

0.00% 0.00% 0.00% 4.84%

4.40 CURING / WATERPROOFING / BACK FILLING INS

FN

CV

CUM

108

103.68

08‐Oct‐18

26‐Nov‐18

08‐Oct‐18

0.02%

0.11%

100.000%

92.00%

‐64.00%

96.00%

36.00%

96.00%

60.00%

0.04%

0.19%

100.000%

92.00%

‐20.19%

95.00%

79.81%

95.00%

15.19%

0.02% 0.04% 0.04%

0.07% 0.19% 0.19%

100.000% 100.000% 85.106%

100.00% 85.00% 80.00%

‐42.17% ‐42.17% ‐40.11%

100.00% 85.00% 85.00%

57.83% 57.83% 45.00%

100.00% 85.00% 85.00%

42.17% 27.17% 40.00%

0.04%

0.19%

60.417%

30.00%

‐23.72%

50.00%

36.70%

50.00%

13.30%

0.02% 0.02% 0.00% 0.01% 0.01%

0.07% 0.11% 0.02% 0.03% 0.05%

100.000% 100.000% 100.000% 100.000% 100.000%

100.00% 95.00% 100.00% 85.00% 70.00%

0.00% 0.00% ‐16.15% ‐16.15% ‐58.56%

100.00% 100.00% 100.00% 85.00% 75.00%

100.00% 100.00% 83.85% 83.85% 41.44%

100.00% 100.00% 100.00% 85.00% 75.00%

0.00% 0.00% 16.15% 1.15% 33.56%

0.01%

0.05%

100.000%

50.00%

‐57.30%

65.00%

42.70%

65.00%

22.30%

0.06%

0.30%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

METERING SKID 662 663 664 665

A2095‐2 A2140 A2140 A2140‐1

666

A2140‐2

4.40 EXCAVATION XX 4.40 FOUNDATION WORK  (STEEL FIXING) XX 4.40 FOUNDATION WORK  (STEEL FIXING) 4.40 FOUNDATION WORK  (CONCRETE)

07‐Aug‐18 04‐Jul‐18 05‐Sep‐18 20‐Oct‐18

PIPE SUPPORT 668

A2095‐3

669 670 671

A2120 A2120 A2120‐1

672

A2120‐2

EXCAVATION FOR STRUCTURAL STEEL PIPE  4.40 SUPPORTS XX 4.40 FOUNDATION WORK  (STEEL FIXING) XX 4.40 FOUNDATION WORK  (STEEL FIXING) 4.40 FOUNDATION WORK  (CONCRETE)

INS

FN

CV

CUM

50

47.5

04‐Aug‐18

15‐Nov‐18

04‐Aug‐18

INS INS INS

FN FN FN

CV CV CV

CUM CUM CUM

4200 4200 35

4200 3570 29.75

08‐Sep‐18 08‐Sep‐18 11‐Sep‐18

29‐Nov‐18 29‐Nov‐18 19‐Dec‐18

09‐Jul‐18 08‐Sep‐18 11‐Sep‐18

4.40 CURING / WATERPROOFING / BACK FILLING INS

FN

CV

CUM

76

38

16‐Sep‐18

02‐Jan‐19

16‐Sep‐18

4.40 4.40 4.40 4.40 4.40

INS INS INS INS INS

FN FN FN FN FN

CV CV CV CV CV

CUM CUM CUM CUM CUM

100 100 3647 3647 26

100 100 3647 3099.95 19.5

26‐May‐18 26‐May‐18 09‐Jul‐18 09‐Jul‐18 10‐Sep‐18

22‐Oct‐18 22‐Oct‐18 15‐Nov‐18 15‐Nov‐18 29‐Dec‐18

26‐May‐18 26‐May‐18 09‐Jul‐18 09‐Jul‐18 10‐Sep‐18

4.40 CURING / WATERPROOFING / BACK FILLING INS

FN

CV

CUM

206

133.9

18‐Sep‐18

15‐Dec‐18

18‐Sep‐18

INSTALLATION OF STRUCTURAL STEELWORK  4.40 OPERATINGNDCCESS PLATFORMS (TEST  INS SEPERATOR & PLATFORM)

FN

STIN

Kg

9298

0

06‐Jan‐19

26‐Jan‐19

09‐Jul‐18

PSV 674 675 676 677 678

A2095‐4 A2095‐4 A2140‐3 A2140‐3 A2140‐4

679

A2140‐5

XX XX XX XX

EXCAVATION EXCAVATION FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (STEEL FIXING) FOUNDATION WORK  (CONCRETE)

26‐May‐18 22‐Oct‐18 09‐Jul‐18

Structural Steel TEST SEPERATOR 682

A2660

Page 100 of 170

Sr.no. Activity ID XX 683

A2660‐1

Inv  Code

Activity Name INSTALLATION OF LADDERS, STAIRS,  HANDRAILS

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

INS

FN

STIN

INSTALLATION OF STRUCTURAL STEEL OF  4.40 METERING SKID INCL. WALK WAY OR CROSS  INS OVER

FN

STIN

Kg

4.40

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

0

16‐Jan‐19

26‐Jan‐19

0.06%

0.30%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

2470

0

09‐Jan‐19

21‐Jan‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

METERING SKID 685

A2670

PSV 687

A2680

INSTALLATION OF PSV VALVESCCESS  PLATFORMS

INS

FN

STIN

Kg

1705

0

26‐Dec‐18

05‐Jan‐19

0.02%

0.08%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL PIPE  4.40 SUPPORTS & MODIFICATIONS OF  EXISTINGCCESS PLATFORMS (IFPPLICABLE)

INS

FN

STIN

Kg

4078

0

10‐Jan‐19

30‐Jan‐19

0.02%

0.08%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4.40 INSTALLATION OF INSTRUMENT STANCHION INS

FN

STIN

PCS

151

0

30‐Jan‐19

04‐Feb‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4.10 INSTALLATION OF NEW TEST SEPARATOR

INS

FN

ME

SET

137.5

137.5

05‐Sep‐18

12‐Sep‐18

0.02%

0.10%

0.000%

100.00%

100.00%

100.00%

100.00%

100.00%

0.00%

INS

FN

PPIN

0

24‐Mar‐19

24‐Mar‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

PPIN

0

24‐Mar‐19

31‐Mar‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS

FN FN

PPIN PPIN

0 0

31‐Mar‐19 15‐Apr‐19

15‐Apr‐19 22‐Apr‐19

0.06% 0.02%

0.29% 0.10%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0

21‐Jan‐19

13‐Feb‐19

0.08%

0.39%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

29‐Jan‐19

11‐Feb‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4.40

PIPE SUPPORT 689

A2690

FIELD INSTRUMENT 691

A2700

Mechanical 693

696 697 698 699

A2875

Piping Pre Shutdownnd Plant Shutdown Tie‐in A3200‐a 4.10 MOBILIZATION OF OF TEAMPPLY PTW SCAFFOLDING / PLATE FORM / WORK  A3200‐b 4.10 PERMIT ISSUE A3200‐1 4.10 PIPING TIE‐IN / NDT PRE SHUT DOWN A3200‐2 4.10 PIPING TIE‐IN / NDT SHUT DOWN PIPING ‐REMAINING PIPING INSTALLATION ON PIPE  SUPPORT,PIERACK &ROUND EQUIPMENT

701

A3170

4.10

INS

FN

PPIN

702

A3170‐1

4.10 INSTALLATION OF BALL VALVE & GGC VALVE INS

FN

PPIN

703

A3190

4.10

704

A3180

4.10

705

A3200

4.10

706

A3201

4.10

HYDRO‐TESTING, FLUSHING, DRAININGND  PURGING INLET PIPING  TIE‐IN TO SEPARATOR  (PARTIAL SHUTDOWN TIE‐IN) TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN  TIE‐IN / INSTALL SDV

DIN

316

05‐Sep‐18

12‐Sep‐18

INS

FN

PPIN

SET

240

0

02‐Feb‐19

16‐Feb‐19

0.08%

0.39%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

PPIN

DIN

316

0

15‐Apr‐19

20‐Apr‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

PPIN

PCS

1782

0

15‐Apr‐19

20‐Apr‐19

0.06%

0.27%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

PPIN

PCS

66

0

17‐Apr‐19

20‐Apr‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS INS

FN FN FN FN FN FN

EL EL EL EL EL EL

LM

141.9

LM

141.9

LM LM

88 116.6

0 0 0 0 0 0

08‐Nov‐18 31‐Dec‐18 30‐Dec‐18 06‐Jan‐19 30‐Jan‐19 16‐Feb‐19

24‐Dec‐18 05‐Jan‐19 07‐Jan‐19 19‐Jan‐19 18‐Feb‐19 28‐Feb‐19

0.00% 0.01% 0.02% 0.02% 0.01% 0.02%

0.00% 0.03% 0.07% 0.07% 0.06% 0.09%

0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Electrical 708 709 708 709 710 711

A2160‐11 A3930 A3730 A3730‐1 A3760 A3720

4.40 4.30 4.30 4.30 4.30 4.30

CABLE TRENCH EARTH PIT DRILLING U/G CABLE LAYING BACK FILLING OF CABLE TRENCH CABLE LAYING CABLE GLANDND TERMINATION

712

A3750

4.30 ELECTRICAL EQUIPMENTS INSTALLATION

INS

FN

EL

PCS

92.4

0

02‐Feb‐19

14‐Feb‐19

0.01%

0.07%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

713

A3770

4.30 LIGHTING FIXTUREND DB INSTALLATION

INS

FN

EL

PCS

231

0

21‐Feb‐19

03‐Mar‐19

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

714 715 716 717

A3740 A3760‐1 A3780 A3790

INS INS INS INS

FN FN FN FN

EL EL EL EL

LM

292.6

SET SET

44 44

0 0 0 0

26‐Jan‐19 03‐Mar‐19 07‐Mar‐19 10‐Mar‐19

04‐Feb‐19 07‐Mar‐19 09‐Mar‐19 13‐Mar‐19

0.02% 0.02% 0.01% 0.01%

0.07% 0.07% 0.03% 0.03%

0.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

INS INS INS

FN FN FN

IN IN IN

LM LM

36.3 36.3

0 0 0

16‐Jan‐19 27‐Jan‐19 30‐Jan‐19

30‐Jan‐19 30‐Jan‐19 02‐Feb‐19

0.00% 0.00% 0.00%

0.02% 0.00% 0.00%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

719 719 720

4.30 4.30 4.30 4.30 Instrument & Control A4200 4.20 A4940 4.20 A4930 4.20

720

A4220‐2

721

A4230

CABLE TRAY/DUCT INSTALLATION JB SUPPORT INSTALLATION  JB INSTALLATION FIELD INSTRUMENT INSTALLATION  4.20 (GAUGESND TRANMITTERS) 4.20 INSTRUMENT CABLE LAYING

722

A4220

4.20 INSTRUMENT EQUIPEMNT INSTALLATION

721

A4980

4.20 CABLE GLANDND TERMINATION (ALONG JB) INS

722

A4990

4.20

723

A4240

4.20

724

A4220‐1

4.20

725

A4220‐3

4.20

726

A4230‐1

4.20

727

A4210

4.20

728

A5330

4.50

F&G System

CABLE TRAY INSTALLATION HOOK UP ELECTRICAL TIE‐INS ENERGIZATION

CABLE GLANDND TERMINATION (ALONG  INSTRUMENTS) DCS MODIFICATION IN CONTROL ROOM BY  VENDOR INSTALLATION OF INSTRUMENT VALVE INSTALLATION OF BS & WNALYZERS ON  METERING SKID SS TUBEND LEAK TEST INSTRUMENT EQUIPMENT CALIBRATION /  LOOP TEST INSTALLATION OF  DELUGE

INS

FN

IN

0

23‐Jan‐19

18‐Feb‐19

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

IN

LM

1441

0

22‐Jan‐19

09‐Feb‐19

0.03%

0.14%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

IN

SET

317.9

0

23‐Jan‐19

12‐Feb‐19

0.05%

0.23%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

IN

LM

1441

0

10‐Feb‐19

20‐Feb‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

FN

IN

SET

317.9

0

16‐Feb‐19

23‐Feb‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00% 0.00%

INS

FN

IN

0

12‐Feb‐19

21‐Feb‐19

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

IN

0

10‐Feb‐19

12‐Feb‐19

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

IN

0

10‐Feb‐19

12‐Feb‐19

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

IN

0

23‐Feb‐19

26‐Feb‐19

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

IN

SET

154

0

25‐Feb‐19

03‐Mar‐19

0.02%

0.11%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FN

IN

SET

550

0

05‐Feb‐19

12‐Feb‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Page 101 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

719 719 720 720 721

A6360 A6370 A6380 A6390 A6400

4.50 4.50 4.50 4.50 4.50

F&G CABLE INSTALLATION F&G SUPPORT INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION

722

A6410

4.50 F&G CABLE GLANDINGND TERMINATION

721 722

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty 36.3 36.3

Actual phy  Forecast Start progress (Rev : 04)

INS INS INS INS INS

FN FN FN FN FN

IN IN IN IN IN

LM LM

LM

INS

FN

IN

SET

A6420 A6430

INS INS

FN FN

IN IN

LM SET

730

4.50 F&G LOOP PREPARATION 4.50 F&G LOOP TESTING Painting & Fireproofing A4460 4.10 PIPING PAINTINGND TOUCH‐UP

INS

FN

FP

SQM

256

0

731

A4450

4.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS

FN

FP

SQM

247

0

732

A4470

4.50 FIREPROOFING FOR STRUCTURAL STEEL

INS

FN

FP

SQM

1256.2

0

INS

FN

DEM

PCS

8.8

DEPRESSURIZATION / ISOLATION (PIPING &  INS INSTRUMENTATION)

FN

DEM

PCS

54.56

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

1441

0 0 0 0 0

22‐Jan‐19 27‐Jan‐19 29‐Jan‐19 30‐Jan‐19 02‐Feb‐19

30‐Jan‐19 30‐Jan‐19 02‐Feb‐19 31‐Jan‐19 04‐Feb‐19

0.01% 0.01% 0.01% 0.01% 0.01%

0.03% 0.03% 0.03% 0.03% 0.03%

0.000% 0.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

317.9

0

18‐Feb‐19

23‐Feb‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1441 317.9

0 0

23‐Feb‐19 24‐Feb‐19

24‐Feb‐19 27‐Feb‐19

0.01% 0.01%

0.03% 0.03%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

04‐Feb‐19

18‐Feb‐19

0.04%

0.19%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

04‐Feb‐19

18‐Feb‐19

0.04%

0.18%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

10‐Feb‐19

04‐Mar‐19

0.19%

0.92%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

07‐May‐19

09‐May‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

11‐May‐19

12‐May‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Demolition Works 734

DM1280

4.60 WORK PERMITPPROVED FOR DEMOLITION

735

DM1290

4.60

736

DM1310

4.60 APPLYNTI RUST TO FOUNDATION BOTLS

INS

FN

DEM

PCS

27.28

0

12‐May‐19

13‐May‐19

0.00%

0.02%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

737

DM1300

4.60 COLD CUTTING INLETND OUTLET PIPING

INS

FN

DEM

PCS

54.56

0

13‐May‐19

05‐Jun‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

738

DM1320

4.60 UNBOLD & REMOVE EXISTING SEPARATOR

INS

FN

DEM

PCS

190.96

0

05‐Jun‐19

06‐Jun‐19

0.03%

0.14%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

739

DM1330

4.60

REMOVE CONCRETE FOUNDATION / GRADE  INS THEREA

FN

DEM

PCS

227

0

08‐Jun‐19

25‐Jun‐19

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

24‐Jun‐18

19‐Sep‐18

24‐Jun‐18

0.00%

0.00%

100.000%

100.00%

0.00%

100.00%

100.00%

100.00%

0.00%

INS

FM

DEM

0

01‐Nov‐18

06‐Nov‐18

01‐Nov‐18

0.000%

0.00%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

07‐Nov‐18

14‐Nov‐18

01‐Nov‐18

0.00%

0.00%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

COMPLETE  DEMO WORK  OF SEPARATOR &  5.60 METERING SKID FOUNDATION (CIVIL,PIPING,  INS ELEC. & INSTR.)

FM

DEM

0

15‐Nov‐18

19‐Dec‐18

0.00%

0.00%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

07‐Nov‐18

12‐Nov‐18

0.01%

0.05%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

11‐Nov‐18

12‐Nov‐18

0.01%

0.05%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

5.60 ISOLATION OFSSOCIATED ELECTRICAL ITEMS INS

FM

DEM

0

13‐Nov‐18

14‐Nov‐18

0.01%

0.05%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

14‐Nov‐18

21‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

19‐Nov‐18

21‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

20‐Nov‐18

25‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

25‐Nov‐18

26‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

25‐Nov‐18

26‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

27‐Nov‐18

28‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

26‐Nov‐18

26‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

FAHM DEMOLITION WORKS 742

FM‐DEM‐1010

743

FM‐DEM‐1020

744

FM‐DEM‐1030

745

FM‐DEM‐1040

749

749

METHOD STATEMENT RE SUBMISSION   &PPROVED BY QP OPERATION CLEARANCE & VESSEL  DEPRESSURIZATION BY QP OPERATION  5.60 TEAM & HANDOVER TO CPECCTO START  ISOLATION & DEMOLITION PURGING  / SYSTEM ISOLATE  SEPERATOR  5.60 FROM EXISTING  SYSTEM 5.60

ISOLATION WORKS PIPING ISOLATION A5630 5.60 ISOLATION OF EXISTING VALVES INSTRUMENT ISOLATION A5640

5.60 ISOLATION OFSSOCIATED INTRUMENTS

19‐Sep‐18

ELECTRICAL ISOLATION 749

749

A5650

DEMOLITION WORKS DEMOLITION OF EXISTING PIPING REMOVAL OF EXISITNG PIPING WITH  A5660 5.60 SEPARATOR DEMOLITION OF EXISTING INSTRUMENTATION 5.60

749

A5670

749

A5680

5.60

749

A5690

5.60

749

A5700

749

REMOVAL OF EXISITNG INTRUMENTSND  CABLES WITH SEPARATOR

REMOVAL OF SEPARTOR FROM EXISTING  LOGIC DISMANTLING OF EXISTING SEPARATOR REMOVAL OF EXISITNG INTRUMENTSND  CABLES WITH SEPARATOR

REMOVAL OF SEPARTOR FROM EXISTING  LOGIC REMOVAL OF SEPARTOR FROM EXISTING  A5710 5.60 LOGIC DISMANTLING OF EXISTING SEPARATOR PLATFORM 5.60

A5750

5.60 APPLICATION OFNTI‐RUST PAINT/COATING

749

A5760

UNBOLTING OF SEPARATOR FROM  5.60 FOUNDATION

INS

FM

DEM

0

26‐Nov‐18

27‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

A5770

5.60 LIFITNGND REMOVAL FROM FOUNDATION

INS

FM

DEM

0

27‐Nov‐18

01‐Dec‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

DISMANTLING OF EXISTING METERING SKID

Page 102 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

A5720

5.60 APPLICATION OFNTI‐RUST PAINT/COATING

INS

FM

DEM

0

27‐Nov‐18

27‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

A5730

UNBOLTING OF PLATFORM FROM  5.60 FOUNDATION

INS

FM

DEM

0

27‐Nov‐18

28‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

A5740

5.60 LIFTINGND REMOVAL FROM FOUNDATION

INS

FM

DEM

0

01‐Dec‐18

02‐Dec‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

DISMANTLING OF EXISTING METERING SKID PLATFORM 749

A5780

5.60 APPLICATION OFNTI‐RUST PAINT/COATING

INS

FM

DEM

0

27‐Nov‐18

28‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

A5790

5.60 UNBOLTING FROM FOUNDATION

INS

FM

DEM

0

27‐Nov‐18

29‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

A5800

5.60 LIFTINGND REMOVAL FROM FOUNDATION

INS

FM

DEM

0

02‐Dec‐18

05‐Dec‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

DISMANTLING OF EXISTING PSV PLATFORM A5810

5.60 APPLICATION OFNTI‐RUST PAINT/COATING

INS

FM

DEM

0

27‐Nov‐18

28‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

A5820

UNBOLTING OF PLATFORM FROM  5.60 FOUNDATION

INS

FM

DEM

0

27‐Nov‐18

29‐Nov‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

A5830

5.60 LIFTINGND REMOVAL FROM FOUNDATION

INS

FM

DEM

0

04‐Dec‐18

05‐Dec‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

02‐Dec‐18

20‐Dec‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

06‐Dec‐18

15‐Dec‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

DEM

0

06‐Dec‐18

13‐Dec‐18

0.00%

0.01%

100.000%

65.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

749

749

749 749

749 750

DEMOLITION OF EXISITNG SEPARATOR FOUNDATION EXISTING SEPARATOR FOUNDATION  A5840 5.60 DEMOLITION DEMOLITION OF EXISTING METERING SKID FOUNDATION A5850 5.60 EXISTING FOUNDATION DEMOLITION DEMOLITION OF EXISTING PSV FOUNDATION A5860 5.60 EXISTING FOUNDATION DEMOLITION INSTALLATION Civil Works COMMOMN A2230 5.40 GRADING CABLE TRENCHESND UTILITY ROAD  A2300 5.40 CROSSINGS

INS

FM

CV

SQM

363

272.25

14‐Sep‐18

15‐Nov‐18

0.06%

0.27%

100.000%

65.00%

‐33.33%

75.00%

66.67%

75.00%

8.33%

INS

FM

CV

PCS

827.2

0

04‐Dec‐18

01‐Jan‐19

0.03%

0.15%

75.862%

0.00%

‐75.86%

0.00%

0.00%

0.00%

0.00%

SOAKWAY PIT EXCAVATION & INSTALLATION  INS INCL. DEMOLITION ‐  IFPPLICABLE

FM

CV

0

25‐Nov‐18

18‐Dec‐18

0.03%

0.15%

91.667%

0.00%

‐91.67%

0.00%

0.00%

0.00%

0.00%

FM

CV

0

26‐Dec‐18

10‐Jan‐19

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

751

A2280‐3

5.40

752

A2230‐1

5.40 PROTECTION OF UNDERGROUND CABLES

753

A2290

754

A2310

ROADSND PAVING(INCLUDING  5.40 MODIFICATIONS) 5.40 DRAINAGE PIPE CULVERTS

755 756

INS

14‐Sep‐18

INS

FM

CV

SQM

0

0

18‐Apr‐19

07‐May‐19

0.03%

0.15%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

CV

LM

3.3

0

22‐Jan‐19

19‐Feb‐19

0.00%

0.00%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

A2320

5.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS

FM

CV

PCS

66

0

07‐May‐19

26‐May‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

A2350

RE‐INSTATEMENT OF EXISTING PAVEMENT  5.40 (INTERLOCK PAVING)

INS

FM

CV

SQM

171.6

0

07‐May‐19

26‐May‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS INS

FM FM FM FM FM FM

CV CV CV CV CV CV

CUM CUM CUM CUM CUM CUM

0 0 0 0 0 0

20‐Dec‐18 02‐Jan‐19 06‐Jan‐19 14‐Jan‐19 19‐Jan‐19 26‐Jan‐19

06‐Jan‐19 08‐Jan‐19 22‐Jan‐19 22‐Jan‐19 30‐Jan‐19 03‐Feb‐19

0.03% 0.00% 0.02% 0.01% 0.01%

0.14% 0.02% 0.08% 0.03% 0.11% 0.04%

100.000% 100.000% 12.500% 0.000% 100.000% 100.000%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% ‐12.50% 0.00% ‐100.00% ‐100.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

INS

FM

CV

CUM

0

29‐Jan‐19

07‐Feb‐19

0.01%

0.04%

12.500%

0.00%

‐12.50%

0.00%

0.00%

0.00%

0.00%

INS

FM

CV

CUM

0

03‐Feb‐19

12‐Feb‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS INS

FM FM FM FM FM FM

CV CV CV CV CV CV

CUM CUM CUM CUM CUM CUM

0 0 0 0 0 0

01‐Jan‐19 22‐Jan‐19 22‐Jan‐19 31‐Jan‐19 06‐Feb‐19 11‐Feb‐19

26‐Jan‐19 07‐Feb‐19 31‐Jan‐19 07‐Feb‐19 16‐Feb‐19 18‐Feb‐19

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

100.000% 100.000% 12.500% 0.000% 100.000% 100.000%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% ‐12.50% 0.00% ‐100.00% ‐100.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TEST SEPERATOR 758 759 760 761 758 759

A2240 A2250 A2240‐1 A2270 A2240‐11 A2240‐2

5.40 5.40 5.40 5.40 5.40 5.40

EXCAVATION BLINDING FOUNDATION (STEEL FIXING) FORMWORK FOR FOUNDATION FOUNDATION (CONCRETE) CURING

760

A2240‐22

5.40 WATER PROOFING (BITUMEN COATING)

761

A2240‐32

0.02%

758 759 760 761 758 759

5.40 BACKFILL TEST SEPERATOR PLATFORM A5900 5.40 EXCAVATION A2240‐62 5.40 BLINDING A5880 5.40 FOUNDATION (STEEL FIXING) A5890 5.40 FORMWORK FOR FOUNDATION A2240‐72 5.40 FOUNDATION (CONCRETE) A2240‐82 5.40 CURING

760

A2240‐42

5.40 WATER PROOFING (BITUMEN COATING)

INS

FM

CV

CUM

0

16‐Feb‐19

23‐Feb‐19

0.00%

0.00%

12.500%

0.00%

‐12.50%

0.00%

0.00%

0.00%

0.00%

761

A2240‐52

5.40 BACKFILL

INS

FM

CV

CUM

0

18‐Feb‐19

25‐Feb‐19

0.00%

0.00%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS INS

FM FM FM FM FM FM

CV CV CV CV CV CV

CUM CUM CUM CUM CUM CUM

0 0 0 0 0 0

30‐Dec‐18 01‐Jan‐19 05‐Jan‐19 09‐Jan‐19 12‐Jan‐19 21‐Jan‐19

12‐Jan‐19 08‐Jan‐19 14‐Jan‐19 14‐Jan‐19 21‐Jan‐19 28‐Jan‐19

0.01% 0.01% 0.01% 0.01% 0.01% 0.01%

0.06% 0.06% 0.06% 0.06% 0.06% 0.06%

100.000% 100.000% 12.500% 0.000% 100.000% 100.000%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

‐100.00% ‐100.00% ‐12.50% 0.00% ‐100.00% ‐100.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

METERING SKID 763 759 760 761 758 759

A2240‐12 A2240‐92 A2240‐102 A2240‐122 A2240‐112 A2240‐132

5.40 5.40 5.40 5.40 5.40 5.40

EXCAVATION BLINDING FOUNDATION (STEEL FIXING) FORMWORK FOR FOUNDATION FOUNDATION (CONCRETE) CURING

60

760

A2240‐142

5.40 WATER PROOFING (BITUMEN COATING)

INS

FM

CV

CUM

0

28‐Jan‐19

30‐Jan‐19

0.01%

0.06%

12.500%

0.00%

‐12.50%

0.00%

0.00%

0.00%

0.00%

761

A2240‐152

5.40 BACKFILL

INS

FM

CV

CUM

0

30‐Jan‐19

06‐Feb‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

EXCAVATION FOR STRUCTURAL STEEL PIPE  5.40 SUPPORTS

INS

FM

CV

CUM

0

04‐Aug‐18

24‐Nov‐18

0.03%

0.14%

100.000%

63.00%

‐26.55%

63.00%

73.45%

63.00%

‐10.45%

PIPE SUPPORT 765

A2235‐4

Page 103 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

U.M.

Qty

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start 01‐Nov‐18

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

766

A2260‐3

5.40 BLINDING CONCRETE FOR PS FOUNDATIONS INS

FM

CV

CUM

0

07‐Nov‐18

05‐Dec‐18

0.00%

0.02%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

767 768 765 766

A2260 A2260‐4 A2260‐1 A2260‐2

5.40 5.40 5.40 5.40

INS INS INS INS

FM FM FM FM

CV CV CV CV

CUM CUM CUM CUM

0 0 0 0

13‐Nov‐18 20‐Nov‐18 21‐Nov‐18 24‐Nov‐18

12‐Dec‐18 12‐Dec‐18 20‐Dec‐18 23‐Dec‐18

0.02% 0.01% 0.03% 0.01%

0.10% 0.04% 0.15% 0.05%

100.000% 68.966% 100.000% 100.000%

0.00% 0.00% 63.00% 0.00%

‐100.00% ‐68.97% ‐100.00% ‐100.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00%

767

A2260‐5

5.40 WATER PROOFING (BITUMENT COATING)

INS

FM

CV

CUM

0

09‐Dec‐18

31‐Dec‐18

0.01%

0.05%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

768

A2260‐6

5.40 BACKFILLING

INS

FM

CV

CUM

0

16‐Dec‐18

07‐Jan‐19

0.01%

0.05%

68.966%

0.00%

‐68.97%

0.00%

0.00%

0.00%

0.00%

FOUNDATION WORK  (STEEL FIXING) FORMWORK FOR FOR PS FOUNDAITON FOUNDATION WORK  (CONCRETE) CURING

PSV 770

A2235‐5

INS

FM

CV

CUM

100

0

20‐Dec‐18

06‐Jan‐19

0.03%

0.15%

100.000%

0.00%

‐100.00%

0.00%

0.00%

0.00%

0.00%

771 772

A2280 A2280‐1

EXCAVATION (INCLUDINGREA LIGHTING  POLES) 5.40 FOUNDATION WORK  (STEEL FIXING) 5.40 FOUNDATION WORK  (CONCRETE)

INS INS

FM FM

CV CV

CUM CUM

3647 26

0 0

06‐Jan‐19 22‐Jan‐19

22‐Jan‐19 07‐Feb‐19

0.01% 0.01%

0.03% 0.03%

100.000% 18.750%

0.00% 0.00%

‐100.00% ‐18.75%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

773

A2280‐2

5.40 CURING / WATERPROOFING / BACK FILLING INS

FM

CV

CUM

206

0

07‐Feb‐19

21‐Feb‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

26‐Feb‐19

21‐Mar‐19

0.05%

0.23%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

5.40

Structural Steel TEST SEPERATOR INSTALLATION OF LADDERS, STAIRS,  HANDRAILS

776

A2730‐1

5.40

INS

FM

STIN

777

A2730

INSTALLATION OF STRUCTURAL STEELWORK  5.40 OPERATINGNDCCESS PLATFORMS (TEST  INS SEPERATOR & PLATFORM)

FM

STIN

Kg

9298

0

26‐Feb‐19

21‐Mar‐19

0.05%

0.23%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INSTALLATION OF STRUCTURAL STEEL OF  5.40 METERING SKID INCL. WALK WAY OR CROSS  INS OVER

FM

STIN

Kg

2470

0

04‐Feb‐19

17‐Feb‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

METERING SKID 779

A2740

PSV 781

A2750

INSTALLATION OF PSV VALVESCCESS  PLATFORMS

INS

FM

STIN

Kg

1705

0

25‐Feb‐19

09‐Mar‐19

0.01%

0.06%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

STIN

Kg

4078

0

24‐Dec‐18

24‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

MODIFICATIONS OF EXISTING PIPE SUPORT  INS /CCESS PLATFORMS

FM

STIN

0

24‐Dec‐18

09‐Jan‐19

0.01%

0.03%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

5.40 INSTALLATION OF INSTRUMENT STANCHION INS

FM

STIN

PCS

151

0

26‐Jan‐19

30‐Jan‐19

0.01%

0.04%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

5.10 INSTALLATION OF NEW TEST SEPARATOR

INS

FM

ME

SET

137.5

0

07‐Feb‐19

11‐Feb‐19

0.02%

0.10%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

HTAP

0

11‐Mar‐19

13‐Mar‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

HTAP

0

14‐Mar‐19

23‐Mar‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

HTAP

0

24‐Mar‐19

30‐Mar‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

HTAP

0

03‐Apr‐19

06‐Apr‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

PPIN

0

06‐Apr‐19

06‐Apr‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

PPIN

0

06‐Apr‐19

13‐Apr‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

02‐Feb‐19

24‐Feb‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

07‐Feb‐19

17‐Feb‐19

0.03%

0.13%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

25‐Mar‐19

06‐Apr‐19

0.03%

0.16%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

5.40

PIPE SUPPORT 783

A2760

INSTALLATION OF STRUCTURAL STEEL PIPE  5.40 SUPPORTS & MODIFICATIONS OF  EXISTINGCCESS PLATFORMS (IFPPLICABLE)

784

A2760‐1

5.40

FIELD INSTRUMENT 786

A2770

Mechanical 788

A2900

Piping HOT TAPPING 791 792 793 794

796 797

MOBILIZATION OF HOT TAPPING SUB  CONTRACTOR SCAFFOLDING / PLATE FORM / WORK  HT1170 5.10 PERMIT ISSUE HT1180 5.10 HOT TAPPING / NDT HOT TAPPING COMPLETE / REMOVE  HT1190 5.10 SCAFFOLD PIPE INSTALATION & Pre Shutdown WORKS A3260‐a 5.10 MOBILIZATION OF OF TEAMPPLY PTW SCAFFOLDING / PLATE FORM / WORK  A3260‐b 5.10 PERMIT ISSUE HT1160

5.10

798

A3230

PIPING INSTALLATION ON PIPE  5.10 SUPPORT,PIERACK &ROUND EQUIPMENT

INS

FM

PPIN

799

A3230‐1

5.10 INSTALLATION OF BALL VALVE & GGC VALVE INS

FM

PPIN

800

A3250

FM

PPIN

801 802 804 805

807 808 807 808 809 810

HYDRO‐TESTING, FLUSHING, DRAININGND  PURGING INLET PIPING  TIE‐IN TO SEPARATOR  A3240 5.10 (PARTIAL SHUTDOWN TIE‐IN) A3260 5.10 PIPING TIE‐IN / NDT PRE SHUT DOWN Plant Shutdown Tie‐in A3260‐1 5.10 PIPING TIE‐IN / NDT SHUT DOWN REPLACE THE SHUTVALVET POINT OF OIL‐IN  A3261 5.10 TIE‐IN / INSTALL SDV Electrical A6530 5.40 CABLE TRENCH A3940 5.30 EARTH PIT DRILLING A3840 5.30 CABLE TRAY INSTALLATION A3830 5.30 U/G CABLE LAYING A3860 5.30 CABLE LAYING A3820 5.30 CABLE GLANDND TERMINATION 5.10

INS

DIN

347

SET

440

INS

FM

PPIN

DIN

347

0

06‐Apr‐19

11‐Apr‐19

0.05%

0.26%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

PPIN

PCS

1412.4

0

08‐Apr‐19

14‐Apr‐19

0.05%

0.26%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

PPIN

0

15‐Apr‐19

22‐Apr‐19

0.03%

0.16%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

PPIN

PCS

66

0

21‐Apr‐19

22‐Apr‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS INS

FM FM FM FM FM FM

EL EL EL EL EL EL

LM NO LM LM LM LM

500 3 292.6 253 184.8 116.6

0 0 0 0 0 0

03‐Dec‐18 19‐Jan‐19 17‐Feb‐19 13‐Feb‐19 20‐Feb‐19 21‐Feb‐19

26‐Dec‐18 23‐Jan‐19 03‐Mar‐19 21‐Feb‐19 03‐Mar‐19 03‐Mar‐19

0.00% 0.00% 0.01% 0.04% 0.03% 0.02%

0.00% 0.02% 0.05% 0.19% 0.14% 0.09%

0.000% 0.000% 0.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Page 104 of 170

Sr.no. Activity ID XX

Inv  Code

Activity Name

3963‐ PHASE

3963‐ AREA

3963‐ DISC

811

A3850

5.30 ELECTRICAL EQUIPMENTS INSTALLATION

INS

FM

EL

812

A3830‐1

5.30 BACK FILLING OF CABLE TRENCH

INS

FM

EL

813

A3870

5.30 LIGHTING FIXTUREND DB INSTALLATION

INS

FM

EL

814 815 816

A3890‐1 A3880 A3890

INS INS INS

FM FM FM

EL EL EL

5.30 HOOK UP 5.30 ELECTRICAL TIE‐INS 5.30 ENERGIZATION Instrument & Control

U.M.

Qty

PCS

92.4

PCS SET SET

Actual phy  Forecast Start progress (Rev : 04)

Forecast Finish (Rev : 04)

Actual Start

Actual  Finish

Overall  Const. Ind.  Last Week  Last Weekct  Current  Current  Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual

Plan % (Rev : 04)

Actual %

Variance

0

21‐Feb‐19

12‐Mar‐19

0.01%

0.07%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0

23‐Feb‐19

03‐Mar‐19

0.02%

0.07%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

231

0

05‐Mar‐19

12‐Mar‐19

0.04%

0.17%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

44 44

0 0 0

12‐Mar‐19 14‐Mar‐19 17‐Mar‐19

14‐Mar‐19 17‐Mar‐19 20‐Mar‐19

0.02% 0.01% 0.01%

0.07% 0.03% 0.03%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

818

A4260

5.20 CABLE TRAYND SUPPORT INSTALLATION

INS

FM

IN

LM

36.3

0

16‐Feb‐19

05‐Mar‐19

0.02%

0.08%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

818 819 819

A5000 A5040 A4290

5.20 JB SUPPORT INSTALLATION 5.20 JB INSTALLATION 5.20 INSTRUMENT CABLE LAYING

INS INS INS

FM FM FM

IN IN IN

LM LM LM

36.3 1563.1 1563.1

0 0 0

03‐Mar‐19 06‐Mar‐19 28‐Feb‐19

05‐Mar‐19 09‐Mar‐19 19‐Mar‐19

0.00% 0.00% 0.02%

0.01% 0.01% 0.08%

0.000% 0.000% 0.000%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

0.00% 0.00% 0.00%

820

A5050

5.20 CABLE GLANDND TERMINATION (ALONG JB) INS

FM

IN

SET

317.9

0

09‐Mar‐19

19‐Mar‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

820

A4280

5.20 INSTRUMENT EQUIPEMNT INSTALLATION

INS

FM

IN

SET

317.9

0

11‐Mar‐19

20‐Mar‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

821

A4280‐2

5.20

INS

FM

IN

0

11‐Mar‐19

18‐Mar‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

822

A5340

5.50

INS

FM

IN

0

11‐Mar‐19

20‐Mar‐19

0.01%

0.05%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

821

A5060

5.20

INS

FM

IN

0

18‐Mar‐19

24‐Mar‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

823

A4920

5.20

INS

FM

IN

0

19‐Mar‐19

30‐Mar‐19

0.02%

0.10%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

824

A4280‐3

5.20

825

A4280‐1

5.20

826

A4270

5.20

827

A4290‐1

5.20

FIELD INSTRUMENT INSTALLATION  (GAUGESND TRANSMITTER) INSTALLATION OF  DELUGE CABLE GLANDND TERMINATION (ALONG  INSTRUMENTS) DCS MODIFICATION IN CONTROL ROOM BY  VENDOR INSTALLATION OF BS & WNALYZERS ON  METERING SKID INSTALLATION OF INSTRUMENT VALVE INSTRUMENT EQUIPMENT CALIBRATION /  LOOP TEST SS TUBEND LEAK TEST F&G CABLE INSTALLATION F&G SUPPORT INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION

SET

671

INS

FM

IN

0

16‐Mar‐19

18‐Mar‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

IN

0

16‐Mar‐19

18‐Mar‐19

0.06%

0.30%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

IN

0

30‐Mar‐19

02‐Apr‐19

0.06%

0.30%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS

FM

IN

0

19‐Mar‐19

21‐Mar‐19

0.08%

0.40%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

INS INS INS INS INS

FM FM FM FM FM

IN IN IN IN IN

LM LM LM LM SET

36.3 36.3 1563.1 1563.1 317.9

0 0 0 0 0

28‐Feb‐19 02‐Mar‐19 05‐Mar‐19 06‐Mar‐19 09‐Mar‐19

10‐Mar‐19 05‐Mar‐19 09‐Mar‐19 07‐Mar‐19 10‐Mar‐19

0.00% 0.00% 0.00% 0.00% 0.00%

0.01% 0.01% 0.01% 0.01% 0.01%

0.000% 0.000% 0.000% 0.000% 0.000%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

SET

317.9

0

19‐Mar‐19

24‐Mar‐19

0.00%

0.01%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

671

0 0

24‐Mar‐19 25‐Mar‐19

25‐Mar‐19 28‐Mar‐19

0.00% 0.00%

0.01% 0.01%

0.000% 0.000%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

SET

154

F&G System 818 818 819 819 820

A6440 A6450 A6460 A6470 A6480

5.50 5.50 5.50 5.50 5.50

820

A6490

5.50 F&G CABLE GLANDINGND TERMINATION

INS

FM

IN

821 822

A6500 A6510

INS INS

FM FM

IN IN

5.50 F&G LOOP PREPARATION 5.50 F&G LOOP TESTING Painting & Fireproofing

SET

829

A4480

5.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS

FM

FP

SQM

196

0

19‐Mar‐19

30‐Mar‐19

0.03%

0.14%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

830

A4500

5.50 FIREPROOFING FOR STRUCTURAL STEEL

INS

FM

FP

SQM

1002.1

0

25‐Mar‐19

08‐Apr‐19

0.15%

0.74%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

831

A4490

5.10 PIPING PAINTINGND TOUCH‐UP

INS

FM

FP

SQM

277

0

27‐Mar‐19

06‐Apr‐19

0.04%

0.20%

0.000%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Page 105 of 170

PROJECT PLANNING PACKAGE

Attachment 10

EQUIPMENT DEPLOYMENT

Page 106 of 170

Sr.No.

DESCRIPTION

PEAK

M/C

QTY

MONTHS

Project Timeline (Monthwise) Nov-18 Dec-18 Jan-19

15

1

2

2

Feb-19

Mar-19

Apr-19

May-19

Jun-19

2

2

2

2

2

1

BOOM TRUCK

2

2

3-TON PICKUP

1

8

1

1

1

1

1

1

1

1

3

BOBCAT

2

12

1

2

2

2

2

1

1

1

4

DUMP TRUCK

2

12

2

2

2

2

2

2

5

WATER TANKER

3

21

2

2

2

3

3

3

3

3

6

VIBRATORS

2

9

2

2

2

1

1

1

7

VACCUM TRUCK

2

11

1

1

1

1

2

2

2

1

8

CONCRETE MIXER MACHINE

1

5

1

1

1

1

1

1

1

9

REBAR BENDING MACHINE

1

5

1

1

1

1

1

10

LOADER

1

5

1

1

1

1

1

11

HILTI MACHINE

1

8

1

1

1

1

1

1

12

JACK HAMMER

2

11

2

2

2

2

2

1

13

LEVELLING STAFF

3

17

3

3

3

2

2

2

14

CONCRETE CUTTING MACHINE

1

6

1

1

1

1

1

1

15

TOTAL STATION

3

18

3

3

3

2

2

2

16

PLATE COMPACTOR

1

6

1

1

1

1

1

1 1

17

JUMPING COMPACTOR

1

6

1

1

1

1

1

18

01 TON ROLLER

1

5

1

1

1

1

1

2

1

19

ASPHALT CUTTING MACHINE

1

7

1

1

1

1

1

1

1

BATTERY DRILL MACHINE

2

16

2

2

2

2

2

2

2

2

21

BATTERY HILTI MACHINE

2

16

2

2

2

2

2

2

2

2

22

JACK HYDRAULIC 07 TON WELDING GENERATOR

1

8

1

1

1

1

1

1

1

1

10

63

7

8

10

10

10

10

6

2 1

24

CRANE 50T

3

11

1

1

1

1

2

3

1

25

CRANE 100T

2

10

2

2

1

1

1

2

1

1

1

1

2

2

2

1

2

2

3

2

1

1

1

2

2

2

26

TRAILER 20T

2

11

27

PWHT MACHINE

3

10

28

DIESEL GENERATOR 100KW

2

11

29

FORKLIFT 10T

5

13

30

SUV

3

31

PICK-UP

32 33

Aug-19

2

20

23

Jul-19

1

1

1

1 2

2

3

3

3

27

3

3

3

3

3

3

3

3

5

42

5

5

5

5

5

5

4

4

4

BUS

2

16

2

2

2

2

2

2

2

1

1

MINI BUS

3

17

2

2

2

2

2

2

2

2

1

56

59

62

63

66

64

47

32

9

3

-

TOTAL

66

458

REPLACEMENT THREE PHASE TEST SEPARATOR 00 Rev. No.

ISSUED FOR APPROVAL Detail

1-Nov-18 Date

TAA BY

Page 107 of 170

PROJECT PLANNING PACKAGE

Attachment 11

WEEKLY REPORT FORMAT

Page 108 of 170

Contract No.: QP Project No.: Location Code(s):

GC16101100 3963 DGEN (FAHM, FAHN, FAHS, JALM, KAHM, KAHN, KAHS)

Tag Area(s): Contractor: Contract Title:

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS, DUKHAN

Document Title:

WEEKLY PROGRESS REPORT Cut-off Date: 08-Mar-2017

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION

8th Mar

0

Issue for Information

Li Xiuwang

Zafar

Wang Xilin

DATE

REV. NO

REASON FOR REVISION

PREPARED

CHECKED

APPD.

DOCUMENT NUMBER:

3963-WPR-0002

SHT.

001

OF

009

APPD. QP

REV. 0

Page 109 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report

TABLE OF CONTENTS 1.0

MANAGEMENT / EXECUTIVE SUMMARY ............................................................................... 3

2.0

QUALITY AND SAFETY STATUS .............................................................................................. 3

3.0

PROGRESS STATISTICS .......................................................................................................... 5

4.0

DETAILED STATUS AND 2 WEEKS LOOK-AHEAD WITH NARRATIVES .............................. 5

5.0

AREAS OF CONCERNS ............................................................................................................ 7

6.0

SUMMARY STATUS FROM ENGINEERING AND PROCUREMENT REGISTERS ................. 8

7.0

CORRESPONDENCE LOG FOR THE WEEK ........................................................................... 8

8.0

PROGRESS S CURVES ............................................................................................................ 8

9.0

MANPOWER HISTOGRAM WITH SUMMARY TABLE.............................................................. 8

10.0

EQUIPMENT DEPLOYMENT DURING THE REPORTING PERIOD ........................................ 9

DOC. NO.: 3963-WPR-0002

REV.#0

Page 2 of 9 Page 110 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report

1.0

MANAGEMENT / EXECUTIVE SUMMARY China Petroleum Engineering & Construction Corporation (CPECC) has been awarded contract for EPIC by Qatar Petroleum. The project scope covers the replace the Old Three Phase Test Separators with suitably sized New Three Phase Test Separators including the associated metering skids at KAHN, KAHM, KAHS, FAHN, FAHM, FAHS and JALM Degassing Stations at Dukhan Field. The existing old test separators and associated piping, structures, utilities, instrumentation shall be demolished. Effective date of the project is 19-Feb-2017 and completion 18-Feb-2019. Major achievements: 

Submitted Performance Bond and Project Insurances



CPECC, commercial registration is approved by Ministry of Commerce and Economic and received approval message.



CPECC proceeding for trade License requirements.



Detailed engineering site survey is planned from 19th March.



Shutdown activities related to engineering and procurement is consider to at most critical for three degassing station.



Draft Contract document is still with QP.



RFQ for the camp with AMWAJ Company and ALAQARIA Company.



Planning package is under preparation. Since engineering team is engaged to developed shutdown package at early stage of project. Planning package will be submitted on 12th March

2.0

QUALITY AND SAFETY STATUS

2.1

QA/QC

No.

Documents

Status

Submit Day

1

Project QA/AC Plan

Ongoing

Plan-25-03-2017

2

Quality Records Forms

Ongoing

Plan-20-03-2017

3

CPECC Quality Management Procedure

Ongoing

Plan-25-03-2017

4

ITP plan

Ongoing

Plan-25-03-2017



Visual Inspection:

NIL



RFI Issuance:

NIL



Vendor document reviewed: NIL



Quality meeting:

DOC. NO.: 3963-WPR-0002

NIL REV.#0

Page 3 of 9 Page 111 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report

2.2

HSE 

Status HSE deliverable status:

No.

Status

Documents

Submission

1

Project HSE Plan

Ongoing

Plan - 30-03-2017

2

Emergency Response Plan

Ongoing

Plan - 30-03-2017

3

Road Safety Plan

Ongoing

Plan - 30-03-2017

4

HSE Training Plan

Ongoing

Plan - 30-03-2017

5

Environment Management Plan

Ongoing

Plan - 25-03-2017

6

HSE Audit and Inspection Procedure

Ongoing

7

Construction and Fabrication HSE Procedures

Ongoing

8

Incentive and Disciplinary Procedure

Ongoing

9

Incident investigation and reporting procedure

Ongoing



Plan - 20-03-2017

Plan - 30-03-2017

Plan - 30-03-2017

Plan - 30-03-2017

HSE Statistics

No.

DESCRIPTION

This Week

Year Todate

Project Todate

1

FATALITIES

0

0

0

2

MAN-POWER

19

36

36

3

MAN-HOURS WORKED

760

1440

1440

4

0

0

0

5

LOST TIME INCIDENT FREQUENCY (LTIF) TOTAL RECORDABLE INCIDENT RATE: (TRIP = TRI 1,000,000/MAN-HOURS)*

0

0

0

6

VEHICLE ACCIDENT

0

0

0

7

FIRST-AID CASES

0

0

0

8

HAZARDS & NEAR MISSES

0

0

0

REMARKS (If any)

* TRI = Fatality + Restricted Workday Case (RWC) + Medical Treatment Case (MTC)

DOC. NO.: 3963-WPR-0002

REV.#0

Page 4 of 9 Page 112 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report

3.0

PROGRESS STATISTICS Progress Statistics (Planned Vs Actual progress)

Overall Project

S. No. 1 2 3 4 5

PREVIOUS WEEK

DESCRIPTION ENGINEERING PHASE PROCUREMENT PHASE CONSTRUCTION PHASE PRECOMMISSIONING & COMMISSIONING CLOSE-OUT DOCUMENTS

Overall Project

CURRENT WEEK

UP TO DATE

REL. WT. %

PLANNED

ACTUAL

DEV.

PLANNED

ACTUAL

DEV.

PLANNED

ACTUAL

DEV.

3.98%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

65.02%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

21.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

8.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

2.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

100%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4.0

DETAILED STATUS AND 2 WEEKS LOOK-AHEAD WITH NARRATIVES

4.1

Engineering Activities of This Week Process 

Review of Feed Package is ongoing.



Markup of P&IDs related to shutdown tie-in works is finalized.



Early Tie-ins Philosophy is under preparation.



Required input for Valves related to shutdown tie-ins is finalized.

Safety & Loss Prevention 

Review of Feed Package is ongoing.

Piping 

Review of Feed Package is ongoing.



Markup of Specifications and PMS related to shutdown tie-ins works is in progress.



Preparing Datasheets for Valves.



Preparing Need List for Site Survey is in progress.

Mechanical 

Review of Feed Package is ongoing.

DOC. NO.: 3963-WPR-0002

REV.#0

Page 5 of 9 Page 113 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report 

Preparing Need List for Site Survey.

Electrical 

Review of Feed Package is ongoing.



Preparing Need List for Site Survey.

Instrumentation 

Review of Feed Package is ongoing.



Preparing Need List for Site Survey.

Civil & Structural 

Review of Feed Package is ongoing.



Preparing Need List for Site Survey.



Scope of work for U/G survey is under preparation.

Activities Look-Ahead for Next 2 Weeks Process 

Prepare inputs for DBM.



Finalize Early Tie-ins Philosophy.

Safety & Loss Prevention 

Prepare inputs for DBM.

Piping 

Prepare inputs for DBM.



Marking of Specifications and PMS related to shutdown tie-ins works will be finalized.



Datasheets for Valves (related to shutdown tie-in works) will be finalized.



Conducting site survey.

Mechanical 

Prepare inputs for DBM.

Electrical 

Prepare inputs for DBM.



Conducting site survey.

Instrumentation 

Prepare inputs for DBM.

DOC. NO.: 3963-WPR-0002

REV.#0

Page 6 of 9 Page 114 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report 

Conducting site survey.

Civil & Structural

4.2



Prepare inputs for DBM.



Finalize U/G survey scope of work.

Procurement Activities of This Week Nil Activities Look-Ahead for Next 2 Weeks 

4.3

RFQ for Shutdown valves issuance.

Construction Activities of This Week 

Prepare the planning package.



Pre-RFQ for construction equpment.

Activities Look-Ahead for Next 2 Weeks

4.4



Site survey is planned from 19 to 23th March.



Renting Camps.



Contact and pay a visit to local subcontractor.

HSE 

4.5

Preparing the HSE documents according to QP’s HSE procedures and standards.

QA/QC 

QA/QC plan will be submitted by 25-03-2017

5.0

AREAS OF CONCERNS

5.1

General Nil

5.2

Engineering Early approval of deliverables based on preliminary markup (Only for early tie-ins scope / activities).

5.3

Procurement To approve the shutdown procurement package in 5 days.

DOC. NO.: 3963-WPR-0002

REV.#0

Page 7 of 9 Page 115 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report 5.4

Construction NIL

5.5

HSE CPECC request for HSE standards and procedures, the list of requested HSE documents has already been sent to QP through DCC of CPECC. Request for the name list of QP approved third party, including training, equipment & tools inspection, waste disposal, PPE brands, medical service, etc.

5.6

QA/QC NIL

6.0

SUMMARY STATUS FROM ENGINEERING AND PROCUREMENT REGISTERS Summary Status from Engineering and Procurement Registers (Planned Vs Actual in numbers)

6.1

Engineering EDR under preparing

6.2

Procurement Nil

7.0

CORRESPONDENCE LOG FOR THE WEEK See Attachment (format) 7.1 List of Overdue Documents 7.2 List of Documents Issued and Received 7.3 List of Correspondence from CPECC to QP 7.4 List of Correspondence from QP to CPECC

8.0

PROGRESS S CURVES (attachment format only) See Attachment (format) 8.1 - (Overall S-Curve) 8.2 – Engineering 8.3– Procurement 8.4 - Construction

9.0

MANPOWER HISTOGRAM WITH SUMMARY TABLE See Attachment 9.1-Home Office Manpower Histogram 9.2-Construction Manpower Deployment Schedule

DOC. NO.: 3963-WPR-0002

REV.#0

Page 8 of 9 Page 116 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report

10.0

EQUIPMENT DEPLOYMENT DURING THE REPORTING PERIOD See Attachment 10.1-Construction Plant & Equipment Deployment Schedule

DOC. NO.: 3963-WPR-0002

REV.#0

Page 9 of 9 Page 117 of 170

PROJECT PLANNING PACKAGE

Attachment 12

MONTHLY REPORT FORMAT

Page 118 of 170

TABLE OF CONTENTS 1.0

MANAGEMENT / EXECUTIVE SUMMARY ............................................................................... 2

2.0

QA/QC STATUS ........................................................................................................................ 2

3.0

Safety Status .............................................................................................................................. 4

4.0

Project Control ........................................................................................................................... 4

5.0

DETAILED STATUS .................................................................................................................. 5

6.0

AREAS OF CONCERNS ............................................................................................................ 6

7.0

CORRESPONDENCE LOG FOR THE MONTH ........................................................................ 7

8.0

COST CONTROL REPORTS .................................................................................................... 7

9.0

Project Photographs ................................................................................................................... 8

Page 119 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report

1.0

MANAGEMENT / EXECUTIVE SUMMARY Management / Executive Summary (Project information along with major achievements), including a brief summary of the project. 

Project information with Milestone Status

Milestone Description

Planned Date

Actual Date

Status

1. 2. 3. 4.



Overall progress statistics ( Planned Vs Actual)

Cutoff Date

Overall Planned %

Overall Progress %

Variance %

Engineering Procurement Construction Overall



Write-up on Major achievements for each phase

Narrative

2.0



Major Areas of concern affecting schedule completion



Updated Level 1 Schedule ( attachment -1)



Updated Overall Progress Curve ( attachment -2)



Updated Overall Manpower Histogram ( attachment -3)

QA/QC STATUS This Section shall include a comprehensive report on QA/QC aspects of the project. Following shall be included in detail: 

No.

QA/QC document Status

Documents

Rev. no

Status

Planned Submission

1

DOC. NO.: 3963-MPR-0001

REV.#0

Page 2 of 8 Page 120 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report

2 3 

Quality Audit Schedule for each phase S.no

Department

Audit Date

Close Reporting Date

Status

Next Audit Planned

Impact

Status

1 2 3



Concession Request (CR) with Cost/Time Impact Status S.no

Content of CR

Cause

Date Requested

1 2 3

 No.

Non Conformance Report (NCR) and Corrective Action Report (CAR) Status

Name of nonconforming product

Nonconforming products No.

Time

Unit

Nonconforming causes

Corrective and preventive Actions

Closing time

Current status

Remarks

1 2 3 

Inspection and Clearance Status REQUEST FOR INSPECTION (RFI) STATISTICS

No.

INSPECTION

Total RFI 1

RC

0

2

STEEL STRUCUTRE

0

3

PIPING

0

DOC. NO.: 3963-MPR-0001

Total Accepted

Total Cancelled

QP Closed

REV.#0

% Accepted

% Cancelled

% QP Closed

Page 3 of 8 Page 121 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report 4

NDT

0

5

TEST

0

3.0

Safety Status This Section shall include following in detail:

4.0



Lost Time Accidents



Incidents / Near Misses



Safety meetings / Tool room workshops held during the month



Safety man-hours status table as per approved QP format.

Sl. No.

DESCRIPTION

This Week

Year To date

Project To date

1

FATALITIES

0

0

0

2

MAN-POWER

17

17

17

3

MAN-HOURS WORKED

680

1360

1360

4

LOST TIME FREQUENCY (LTIF)

0

0

0

5

TOTAL RECORDABLE INCIDENT RATE: (TRIP = TRI 1,000,000/MANHOURS)*

0

0

0

6

VEHICLE ACCIDENT

0

0

0

7

FIRST-AID CASES

0

0

0

8

HAZARDS & NEAR MISSES

0

0

0

9

SAFETY MEETINGS

1

1

1

10

TOOL BOX TALKS

0

0

0

INCIDENT

Project Control This Section shall include following in detail: 

Updated Milestone Status with forecast completion dates ( from P6 file)



Critical activity listing with total floats based on current update ( from P6 file)



Mitigation plan for arresting delays, if any

DOC. NO.: 3963-MPR-0001

REV.#0

Page 4 of 8 Page 122 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report

5.0

DETAILED STATUS This Section shall include following in detail:

5.1

Summary Status from Engineering and Procurement Registers (Planned Vs Actual in numbers) Engineering

Total Documents

Planned to Issue

Actual Issue

Variance

Planned for next month to issue

Total Numbers

Planned to Issue

Actual Issue

Variance

Planned to Issue

Actual Issue

Variance

Procurement

Description

RFQ PO Vendor Data Material Delivery to Site

5.2

Progress per discipline

Description

Total Numbers

Process Instrumentation Electrical Civil

DOC. NO.: 3963-MPR-0001

REV.#0

Page 5 of 8 Page 123 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report

5.3

A narrative of the months events by discipline for each phase XXXXXXX

5.4

Forecast for next reporting period XXXXXXX

5.5

“Hold” Register Document no

Description

Planned to Issue

Actual Issue

Variance

Planned to Issue

Actual Issue

Variance

1. 2. 3. 4.

5.6

Critical pending approval Status Document no

Description

1. 2. 3. 4.

5.7

Productivity table during the reporting period XXXXXXX

6.0

AREAS OF CONCERNS This Section shall include following in detail:

6.1

Concern on critical activities, if any Narrative

6.2

Late Finish Date and Anticipated Completion Date for these activities Activity ID

Description

DOC. NO.: 3963-MPR-0001

Late Finished Date

REV.#0

Anticipated Completion Date

Remarks

Page 6 of 8 Page 124 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report

1. 2. 3. 4.

6.3

Impact on Schedule Narrative support

7.0

CORRESPONDENCE LOG FOR THE MONTH 7.1 - List of Overdue Documents 7.2 - List of Documents Issued and Received 7.3 - List of Correspondence from CPECC to QP 7.4 - List of Correspondence from QP to CPECC

8.0

COST CONTROL REPORTS This Section shall include following in detail:

8.1

Cost Report Cost report indicating payable amount for the month and cumulative showing breakdown as in Schedule of Price.

8.2

8.3

Invoice Register 

Invoice details



Details of invoices submitted



Amount of each invoice ( including reporting month)



Details of invoices paid



Date when payment was received



Cumulative Payment as on date



Details on Bank Guarantees



Actual and Forecast Cash flow curve

Variation Register giving the following details 

Variation Order Number



Brief Description



Variation Amount



Paid Amount

DOC. NO.: 3963-MPR-0001

REV.#0

Page 7 of 8 Page 125 of 170

Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report

8.4

Change Register giving the following details

9.0



Work Change Request / Claims submitted details.



Brief Description



Schedule and Cost Impact



QP Response



Work Change Request / Claim Status

Project Photographs This Section shall include following in detail:

10.0



Concern on critical activities, if any



Late Finish Date and Anticipated Completion Date for these activities



Impact on Schedule

LIST OF ATTACHMENTS

• • •

Updated Level 1 Schedule ( attachment -1) Updated Overall Progress Curve ( attachment -2) Updated Overall Manpower Histogram ( attachment -3)



List of Overdue Documents (attachment-4)



List of Documents Issued and Received (attachment-5)



List of Correspondence from CPECC to QP (attachment-6)



List of Correspondence from QP to CPECC (attachment-7)

DOC. NO.: 3963-MPR-0001

REV.#0

Page 8 of 8 Page 126 of 170

PROJECT PLANNING PACKAGE

Attachment 13

PRODUCTIVITY CALCULATION

Page 127 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHM DEGASSING STATION ITEM NUMBER 1 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10

ACTIVITY DESCRIPTION MECHANICAL SEPARATOR INSTALLATION PIPING TOTAL LENGTH Nos. of WELDS DIN (Fabrication) DIN (Erection) Nos. of RADIOGRAPHS TIE-INS SHUTDOWN TIE-INS NON SHUTDOWN PWHT ELECTRICAL Low Voltage cable cable gland earthing cable earth rod earth busbar exothermic weld (T-JOINT) and connector EARTH BOSS cable tray cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND E

SKILLED WORKER HOURS

EA

1

EA/H

0.01

125

125

LM EA DIN DIN PC EA EA EA

501 704 1224 1224 3207 10 2 476

LM/H

1.20

418

418

DIN/H DIN/H FILM/H EA/H EA/H EA/H

3.00 1.50 4.00 0.01 0.01 0.67

408 816 802 1120 224 710

408 816 802 1120 224 710

LM PCS LM PCS PCS PCS PCS LM PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS

1550 14 130 3 5 31 1 140 5 0 1 15 15 1 1 47 1 1

LM/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H

6.00 0.50 8.90 0.22 0.25 0.50 0.13 0.57 0.25

258 28 15 14 20 62 8 246 20

0.13 0.50 0.25 0.01 0.01 0.06 0.13 0.13

8 30 60 180 180 752 8 8

SET SET SET SET SET SET SET SET SET SET

6 4 3 5 5 2 5 1 3 5

SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H

0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20

24 16 12 20 10 4 40 8 15 25

LABOUR HOURS

MARK

258 28 15 14 20 62 8 246 20 0 8 30 60 180 180 752 8 8 0 24 16 12 20 10 4 40 8 15 25

Page 128 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHM DEGASSING STATION ITEM NUMBER 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 1 2 3 1 2 3 4 1 2

ACTIVITY DESCRIPTION toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests

SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS PCS PCS

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND E 0.20 5 SET/H 25 0.20 3 SET/H 15 0.13 1 SET/H 8 0.13 1 SET/H 8 0.13 2 SET/H 16 0.13 3 SET/H 24 0.13 1 SET/H 8 0.50 2 SET/H 4 0.13 12 PCS/H 96 6.00 6368 LM/H 1061 0.50 139 PCS/H 278 0.57 19 LM/H 33 1.00 139 LM/H 139 1.00 92 PCS/H 92 8.00 216 SET/H 27 0.30 49 LM/H 163 0.20 22 LM/H 110 0.50 47 LM/H 94 2.00 190 PCS/H 95 2.00 22 PCS/H 11 3.00 32 PCS/H 11

SQM SQM SQM SQM

445.4 301.809 126.4081 455.4

SQM/H SQM/H SQM/H SQM/H

0.50 0.40 0.25 0.50

891 755 506 911

445 453 303 546

445 302 202 364

TON CUM EA

12.02 29.39 1

Kg/H CUM/H EA/H

48.00 1.00 0.01

250 29 83

125

125 29

SET SET SET SET

1 1 1 1

SET/H SET/H SET/H SET/H

0.00 0.01 0.00 0.00

400 200 400 400

400 200 400 400

SET SET

1 1

SET/H SET/H

0.00 0.00

800 1440

800 640

UNIT

SKILLED WORKER HOURS

LABOUR HOURS

MARK

25 15 8 8 16 24 8 4 96 1061 278 33 139 92 27 163 110 94 95 11 11

83

Page 129 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHN DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

CIVIL WORKS

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL MACHIN ESTIMATE Y UNIT HOURS HAND E

SKILLED WORKER HOURS

LABOUR HOURS

1

EXCAVATION

CUM

824.27

CUM/H

120.00

0.25

171.38

171.38

2

BACKFILL

CUM

721.82

CUM/H

60.00

0.12

312.19

312.19

3

STRUCTURE CONCRETE: C40

CUM

95.92

CUM/H

3.00

0.30

118.30

4

BLINDING CONCRETE

CUM

15.50

CUM/H

0.30

51.68

5

CONCRETE SCREED

CUM

4.82

CUM/H

0.30

16.06

6

CONCRETE PROTECTION BELOW GRADE LEVEL

SQM

394.03

SQM/H

8.00

7

CONCRETE PROTECTION ABOVE GRADE LEVEL

SQM

77.02

SQM/H

8.00

9.63

8

0.25mm POLYETHYLENE SHEET

SQM

216.21

SQM/H

4.80

45.04

MARK

49.25

9

NON-SHRINK LEVELING GROUT

CUM

0.61

CUM/H

0.26

2.34

10

REINFORCEMENT BARS

TON

10.55

Kg/H

0.02

527.74

11

FORMWORKS

SQM

376.29

SQM/H

0.70

537.56

12

FORMWORKS REMOVAL

SQM

376.29

SQM/H

1.40

268.78

13

ANCHOR BOLTS:(GALVANISED)

14

M24 WITH 2 NUTS & PLAIN WASHERS

PCS

8.00

PCS/H

3.00

2.67

15

M20 WITH 2 NUTS & PLAIN WASHERS

PCS

244.00

PCS/H

3.00

81.33

16

M16 WITH 1 NUTS & PLAIN WASHERS

PCS

12.00

PCS/H

3.00

4.00

17

PAVING & GRADING

SQM

N/A

SQM/H

18

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

SQM

325.00

SQM/H

2.00

162.50

19

PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA

LM

25.00

LM/H

6.00

4.17

STRUCTURAL STEEL WORKS 1

STRUCTURAL STEEL FABRICATION

KG

22637.65

Kg/H

38

595.73

2

STRUCTURAL STEEL ERECTION

KG

22637.65

Kg/H

72

314.41

3

STEELGRATING:30x5mm BEARING BAR AT 30 PITCH

SQM

59.11

SQM/H

1.5

39.41

4

STEEL HANDRAIL

LM

80.36

LM/H

0.8

100.45

5

STEEL CAGED LADDER(7.3M HIGH)

SET

1

SET/H

0.01

108.00

6

STEEL LADDER(2.45M HIGH)

SET

2

SET/H

0.01

72.00

7

STEEL LADDER(1.5M HIGH)

SET

1

SET/H

0.03

36.00

125.76

Page 130 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHN DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL MACHIN ESTIMATE Y UNIT HOURS HAND E

SKILLED WORKER HOURS

LABOUR HOURS

8

BOL & NUTS WITH PLAIN WASHER

9

M16 WITH 2 NUTS & PLAIN WASHERS

PCS

176

PCS/H

8.00

22.00

22.00

10

M20WITH 2 NUTS & PLAIN WASHERS MECHANICAL SEPARATOR INSTALLATION PIPING TOTAL LENGTH Nos. of WELDS DIN (Fabrication) DIN (Erection) Nos. of RADIOGRAPHS TIE-INS SHUTDOWN TIE-INS NON SHUTDOWN PWHT ELECTRICAL Low Voltage cable cable gland earthing cable earth rod earth busbar exothermic weld (T-JOINT) and connector EARTH BOSS cable tray cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter

PCS

150

PCS/H

8.00

18.75

18.75

EA

1

EA/H

0.01

125.00

LM EA DIN DIN PC EA EA EA

565 500 1096.5 1096.5 2780 11 4 404

LM/H

1.20

470.83

DIN/H DIN/H FILM/H EA/H EA/H EA/H

3.00 1.50 4.00 0.01 0.01 0.67

365.50 731.00 695.00 1,232.00 448.00 602.99

LM PCS LM PCS PCS PCS PCS LM PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS

390 14 130 3 5 27 1 140 8 3 1 15 15 1 1 12 1 1

LM/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H

6.00 0.50 8.90 0.22 0.25 0.50 0.13 0.57 0.25

65.00 28.00 14.61 13.50 20.00 54.00 8.00 245.61 32.00

0.13 0.50 0.25 0.01 0.01 0.06 0.13 0.13

8.00 30.00 60.00 180.00 180.00 192.00 8.00 8.00

SET

6

SET/H

0.25

24.00

1 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1

MARK

65.00 14.61

Page 131 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHN DEGASSING STATION ITEM NUMBER 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

ACTIVITY DESCRIPTION tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS

SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS PCS PCS

SKILLED TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL WORKER MACHIN ESTIMATE Y UNIT HOURS HAND HOURS E 16.00 0.25 4 SET/H 12.00 0.25 3 SET/H 20.00 0.25 5 SET/H 10.00 0.50 5 SET/H 4.00 0.50 2 SET/H 40.00 0.13 5 SET/H 8.00 0.13 1 SET/H 15.00 0.20 3 SET/H 25.00 0.20 5 SET/H 25.00 0.20 5 SET/H 15.00 0.20 3 SET/H 8.00 0.13 1 SET/H 8.00 0.13 1 SET/H 16.00 0.13 2 SET/H 24.00 0.13 3 SET/H 8.00 0.13 1 SET/H 4.00 0.50 2 SET/H 96.00 0.13 12 PCS/H 833.00 6.00 4998 LM/H 286.00 0.50 143 PCS/H 33.33 0.57 19 LM/H 139.00 1.00 139 LM/H 92.00 1.00 92 PCS/H 27.00 8.00 216 SET/H 163.33 0.30 49 LM/H 110.00 0.20 22 LM/H 94.00 0.50 47 LM/H 95.00 2.00 190 PCS/H 11.00 2.00 22 PCS/H 10.67 3.00 32 PCS/H

SQM SQM SQM SQM

560.74 327.883384 85.875075 570.74

UNIT

SQM/H SQM/H SQM/H SQM/H

0.50 0.40 0.25 0.50

1,121.48 819.71 343.50 1,141.48

LABOUR HOURS

MARK

833.00 33.33

94.00

560.74 327.88 137.40 456.59

Page 132 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHN DEGASSING STATION ITEM NUMBER 1 2 3 1 2 3 4 1 2

ACTIVITY DESCRIPTION STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests

UNIT TON CUM EA

SKILLED TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL WORKER MACHIN ESTIMATE Y UNIT HOURS HAND HOURS E 48.00 382.92 18.38 Kg/H 1.00 29.39 29.3917 CUM/H 0.01 83.33 1 EA/H

SET SET SET SET

1 1 1 1

SET/H SET/H SET/H SET/H

0.00 0.01 0.00 0.00

400.00 200.00 400.00 400.00

SET SET

1 1

SET/H SET/H

0.00 0.00

800.00 640.00

LABOUR HOURS

MARK

191.46 29.39

Page 133 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHS DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT MACHIN Y UNIT HOURS HAND E E

SKILLED WORKER HOURS

LABOUR HOURS

MARK

CIVIL WORKS 1

EXCAVATION

CUM

779.46

CUM/H

120.00

0.25

162.06

162.06

2

BACKFILL

CUM

686.11

CUM/H

60.00

0.12

296.74

296.74

3

STRUCTURE CONCRETE: C40

CUM

87.87

CUM/H

3.00

0.30

108.37

4

BLINDING CONCRETE

CUM

14.45

CUM/H

0.30

48.18

5

CONCRETE SCREED

CUM

4.29

CUM/H

0.30

6

CONCRETE PROTECTION BELOW GRADE LEVEL

SQM

377.83

SQM/H

8.00

14.31 47.23

7

CONCRETE PROTECTION ABOVE GRADE LEVEL

SQM

72.37

SQM/H

8.00

9.05

8

0.25mm POLYETHYLENE SHEET

SQM

201.82

SQM/H

4.80

42.05

9

NON-SHRINK LEVELING GROUT

CUM

0.63

CUM/H

0.26

2.43

10

REINFORCEMENT BARS

TON

9.67

Kg/H

0.02

483.27

11

FORMWORKS

SQM

368.75

SQM/H

0.70

526.78

12

FORMWORKS REMOVAL

SQM

368.75

SQM/H

1.40

263.39

13

ANCHOR BOLTS:(GALVANISED)

14

M24 WITH 2 NUTS & PLAIN WASHERS

PCS

8.00

PCS/H

3.00

2.67

15

M20 WITH 2 NUTS & PLAIN WASHERS

PCS

272.00

PCS/H

3.00

90.67

16

M16 WITH 1 NUTS & PLAIN WASHERS

PCS

6.00

PCS/H

3.00

2.00

17

PAVING & GRADING

SQM

105.00

SQM/H

18

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

SQM

47.00

SQM/H

2.00

23.50

LM/H

6.00

4.50

19

PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA

LM

27.00

STRUCTURAL STEEL WORKS 1

STRUCTURAL STEEL FABRICATION

KG

18757.36

Kg/H

38

493.61

2

STRUCTURAL STEEL ERECTION

KG

18757.36

Kg/H

72

260.52

3

STEELGRATING:30x5mm BEARING BAR AT 30 PITCH

SQM

73.49

SQM/H

1.5

48.99

4

STEEL HANDRAIL

LM

93.37

LM/H

0.8

116.71

5

STEEL CAGED LADDER(5.8M HIGH)

SET

1

SET/H

0.01

108.00

6

STEEL LADDER(2.45M HIGH)

SET

1

SET/H

0.01

72.00

7

STEEL LADDER(1.5M HIGH)

SET

1

SET/H

0.03

36.00

104.21

Page 134 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHS DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT MACHIN Y UNIT HOURS HAND E E

SKILLED WORKER HOURS

LABOUR HOURS

8

BOL & NUTS WITH PLAIN WASHER

9

M16 WITH 2 NUTS & PLAIN WASHERS

PCS

169

PCS/H

8.00

21.13

21.13

10

M20WITH 2 NUTS & PLAIN WASHERS MECHANICAL SEPARATOR INSTALLATION PIPING TOTAL LENGTH Nos. of WELDS DIN (Fabrication) DIN (Erection) Nos. of RADIOGRAPHS TIE-INS SHUTDOWN TIE-INS NON SHUTDOWN PWHT ELECTRICAL Low Voltage cable cable gland earthing cable earth rod earth busbar exothermic weld (T-JOINT) and connector EARTH BOSS cable tray cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter

PCS

150

PCS/H

8.00

18.75

18.75

EA

1

EA/H

0.01

125.00

LM EA DIN DIN PC EA EA EA

490 318 1365 1365 2660 9 3 406

LM/H

1.20

408.33

DIN/H DIN/H FILM/H EA/H EA/H EA/H

3.00 1.50 4.00 0.01 0.01 0.67

455.00 910.00 665.00 1,008.00 336.00 605.97

LM PCS LM PCS PCS PCS PCS LM PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS

470 14 130 3 5 30 1 140 8 1 1 17 17 1 1 21 1 1

LM/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H

6.00 0.50 8.90 0.22 0.25 0.50 0.13 0.57 0.25

78.33 28.00 14.61 13.50 20.00 60.00 8.00 245.61 32.00

0.13 0.50 0.25 0.01 0.01 0.06 0.13 0.13

8.00 34.00 68.00 180.00 180.00 336.00 8.00 8.00

SET

6

SET/H

0.25

24.00

1 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1

MARK

78.33 14.61

Page 135 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHS DEGASSING STATION ITEM NUMBER 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

ACTIVITY DESCRIPTION tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS

SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS PCS PCS

TOTAL SKILLED PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT WORKER MACHIN Y UNIT HOURS HAND E HOURS E 0.25 16.00 4 SET/H 0.25 12.00 3 SET/H 0.25 20.00 5 SET/H 0.50 10.00 5 SET/H 0.50 4.00 2 SET/H 0.13 40.00 5 SET/H 0.13 8.00 1 SET/H 0.20 15.00 3 SET/H 0.20 20.00 4 SET/H 0.20 20.00 4 SET/H 0.20 10.00 2 SET/H 0.13 8.00 1 SET/H 0.13 8.00 1 SET/H 0.13 16.00 2 SET/H 0.13 24.00 3 SET/H 0.13 8.00 1 SET/H 0.50 4.00 2 SET/H 0.13 96.00 12 PCS/H 6.00 457.00 2742 LM/H 0.50 278.00 139 PCS/H 0.57 33.33 19 LM/H 1.00 139.00 139 LM/H 1.00 92.00 92 PCS/H 8.00 27.00 216 SET/H 0.30 163.33 49 LM/H 0.20 110.00 22 LM/H 0.50 92.00 46 LM/H 2.00 94.50 189 PCS/H 2.00 11.00 22 PCS/H 3.00 12.33 37 PCS/H

SQM SQM SQM SQM

537.6 295.794 75.57007 547.6

UNIT

SQM/H SQM/H SQM/H SQM/H

0.50 0.40 0.25 0.50

1,075.20 739.48 302.28 1,095.20

LABOUR HOURS

MARK

457.00 33.33

92.00

537.60 295.79 120.91 438.08

Page 136 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHS DEGASSING STATION ITEM NUMBER 1 2 3 1 2 3 4 1 2

ACTIVITY DESCRIPTION STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests

UNIT TON CUM EA

TOTAL SKILLED PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT WORKER MACHIN Y UNIT HOURS HAND E HOURS E 48.00 317.29 15.23 Kg/H 1.00 31.18 31.18001 CUM/H 0.01 83.33 1 EA/H

SET SET SET SET

1 1 1 1

SET/H SET/H SET/H SET/H

0.00 0.01 0.00 0.00

400.00 200.00 400.00 400.00

SET SET

1 1

SET/H SET/H

0.00 0.00

800.00 640.00

LABOUR HOURS

MARK

158.65 31.18

Page 137 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHM DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

PRODUCTIVITY TOTAL PRODUCTIVIT TOTAL ESTIMAT Y UNIT HOURS E MACHINE HAND

SKILLED WORKER HOURS

LABOUR HOURS

1

CIVIL WORKS EXCAVATION

CUM

803

CUM/H

120.00

0.25

167

167

2

BACKFILL

CUM

699

CUM/H

60.00

0.12

302

302

3

STRUCTURE CONCRETE: C40

CUM

98

CUM/H

3.00

0.30

121

121

4

BLINDING CONCRETE

CUM

17

CUM/H

0.30

58

58

5

CONCRETE SCREED

CUM

4

CUM/H

0.30

15

15

6

CONCRETE PROTECTION BELOW GRADE LEVEL

SQM

380

SQM/H

8.00

47

47

7

CONCRETE PROTECTION ABOVE GRADE LEVEL

SQM

84

SQM/H

8.00

10

10

8

0.25mm POLYETHYLENE SHEET

SQM

264

SQM/H

4.80

55

55

9

NON-SHRINK LEVELING GROUT

CUM

1

CUM/H

0.26

2

2

10

REINFORCEMENT BARS

TON

11

Kg/H

0.02

539

539

11

FORMWORKS

SQM

377

SQM/H

0.70

538

538

12

FORMWORKS REMOVAL

SQM

SQM/H

1.40

0

0

13

ANCHOR BOLTS:(GALVANISED)

14

M24 WITH 2 NUTS & PLAIN WASHERS

PCS

8

PCS/H

3.00

3

3

15

M20 WITH 2 NUTS & PLAIN WASHERS

PCS

236

PCS/H

3.00

79

79

16

M16 WITH 1 NUTS & PLAIN WASHERS

PCS

12

PCS/H

3.00

4

4

17

PAVING & GRADING

SQM

N/A

SQM/H

18

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

SQM

210

SQM/H

2.00

105

105

19

PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA

LM

30

LM/H

6.00

5

5

20

NEW SOAKAWAY PIT (STANDARD SIZE)

SET

1

SET/H

0.00

224

224

MARK

STRUCTURAL STEEL WORKS 1

STRUCTURAL STEEL FABRICATION

KG

16126.03

Kg/H

38

424

424

2

STRUCTURAL STEEL ERECTION

KG

16126.03

Kg/H

72

224

134

3

STEELGRATING:30x5mm BEARING BAR AT 30 PITCH

SQM

59.11

SQM/H

1.5

39

39

4

STEEL HANDRAIL

LM

80.36

LM/H

0.8

100

100

5

STEEL CAGED LADDER(7.3M HIGH)

SET

1

SET/H

0.01

108

108

90

Page 138 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHM DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

PRODUCTIVITY TOTAL PRODUCTIVIT TOTAL ESTIMAT Y UNIT HOURS E MACHINE HAND

SKILLED WORKER HOURS

6

STEEL LADDER(2.45M HIGH)

SET

2

SET/H

0.01

72

72

7

STEEL LADDER(1.5M HIGH)

SET

1

SET/H

0.03

36

36

8

BOLT & NUTS WITH PLAIN WASHER

LABOUR HOURS

9

M16 WITH 2 NUTS & PLAIN WASHERS

PCS

144

PCS/H

8.00

18

18

10

M20WITH 2 NUTS & PLAIN WASHERS

PCS

150

PCS/H

8.00

19

19

EA

1

EA/H

0.01

125

125

LM/H

1.20

335

335

MARK

MECHANICAL 1

SEPARATOR INSTALLATION PIPING

1

TOTAL LENGTH

LM

402

2

Nos. of WELDS

EA

606

3

DIN (Fabrication)

DIN

1624

DIN/H

3.00

541

541

4

DIN (Erection)

DIN

1624

DIN/H

1.50

1083

1083

5

Nos. of RADIOGRAPHS

PC

2881

FILM/H

4.00

720

720

6

TIE-INS SHUTDOWN

EA

9

EA/H

0.01

1008

1008

7

TIE-INS NON SHUTDOWN

EA

9

EA/H

0.01

1008

1008

8

PWHT

EA

420

EA/H

0.67

627

627

ELECTRICAL 1

Low Voltage cable

2

cable gland

LM

1060

LM/H

6.00

177

PCS

14

PCS/H

0.50

28

177 28

3

earthing cable

LM

130

LM/H

8.90

15

4

earth rod

PCS

3

PCS/H

0.22

14

5

earth busbar

PCS

5

PCS/H

0.25

20

20

6

exothermic weld (T-JOINT) and connector

PCS

28

PCS/H

0.50

56

56

7 8 9 10 11

EARTH BOSS cable tray cable tray elbow cable tray tee welding socket

PCS LM PCS PCS PCS

1 140 7 0 1

PCS/H LM/H PCS/H PCS/H PCS/H

0.13 0.57 0.25

8 246 28

0.13

8

8 246 28 0 8

15 14

Page 139 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHM DEGASSING STATION ITEM NUMBER 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

ACTIVITY DESCRIPTION lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate

UNIT

PRODUCTIVITY TOTAL PRODUCTIVIT TOTAL ESTIMAT Y UNIT HOURS E MACHINE HAND

PCS PCS PCS PCS PCS PCS PCS

16 16 1 1 14 1 1

PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H

0.50 0.25 0.01 0.01 0.06 0.13 0.13

32 64 180 180 224 8 8

SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS

6 4 3 5 5 2 5 1 3 5 5 3 1 3 1 2 12 5016 143 19 139 92 237 49 22 46 189

SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H PCS/H LM/H PCS/H LM/H LM/H PCS/H SET/H LM/H LM/H LM/H PCS/H

0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20 0.20 0.20 0.13 0.13 0.13 0.50 0.13 6.00 0.50 0.57 1.00 1.00 8.00 0.30 0.20 0.50 2.00

24 16 12 20 10 4 40 8 15 25 25 15 8 24 8 4 96 836 286 33 139 92 30 163 110 92 95

SKILLED WORKER HOURS

LABOUR HOURS

MARK

32 64 180 180 224 8 8 0 24 16 12 20 10 4 40 8 15 25 25 15 8 24 8 4 96 836 286 33 139 92 30 163 110 92 95

Page 140 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHM DEGASSING STATION ITEM NUMBER 28 29 1 2 3 4 1 2 3 1 2 3 4 1 2

ACTIVITY DESCRIPTION sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests

UNIT

PRODUCTIVITY TOTAL PRODUCTIVIT TOTAL ESTIMAT Y UNIT HOURS E MACHINE HAND

SKILLED WORKER HOURS

LABOUR HOURS

PCS PCS

22 32

PCS/H PCS/H

2.00 3.00

11 11

11 11

SQM SQM SQM SQM

467.78 259.2209 39.84603 477.78

SQM/H SQM/H SQM/H SQM/H

0.50 0.40 0.25 0.50

936 648 159 956

468 389 96 573

468 259 64 382

TON CUM EA

13.08 35.32539 1

Kg/H CUM/H EA/H

48.00 1.00 0.01

273 35 83

136

136 35

SET SET SET SET

1 1 1 1

SET/H SET/H SET/H SET/H

0.00 0.01 0.00 0.00

400 200 400 400

400 200 400 400

SET SET

1 1

SET/H SET/H

0.00 0.00

800 640

800 640

MARK

83

Page 141 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHN DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

TOTAL PRODUCTIVIT ESTIAMTED Y UNIT

PRODUCTIVITY MACHINE

HAND

TOTAL HOURS

SKILLED WORKER HOURS

LABOUR HOURS

1

CIVIL WORKS EXCAVATION

CUM

835.979324

CUM/H

120.00

0.25

173.81

173.81

2

BACKFILL

CUM

1180.95126

CUM/H

60.00

0.12

510.76

510.76

3

STRUCTURE CONCRETE: C40

CUM

98.263

CUM/H

3.00

0.30

121.19

4

BLINDING CONCRETE

CUM

15.783

CUM/H

0.30

52.61

5

CONCRETE SCREED

CUM

4.936

CUM/H

0.30

6

CONCRETE PROTECTION BELOW GRADE LEVEL

SQM

396.35

SQM/H

8.00

MARK

16.45 49.54

7

CONCRETE PROTECTION ABOVE GRADE LEVEL

SQM

77.033

SQM/H

8.00

9.63

8

0.25mm POLYETHYLENE SHEET

SQM

218.179

SQM/H

4.80

45.45

9

NON-SHRINK LEVELING GROUT

CUM

0.62025

CUM/H

0.26

2.39

10

REINFORCEMENT BARS

TON

10.81

Kg/H

0.02

540.50

11

FORMWORKS

SQM

376.223

SQM/H

0.70

537.46

12

FORMWORKS REMOVAL

SQM

376.223

SQM/H

1.40

268.73

13

ANCHOR BOLTS:(GALVANISED)

14

M24 WITH 2 NUTS & PLAIN WASHERS

PCS

8

PCS/H

3.00

2.67

15

M20 WITH 2 NUTS & PLAIN WASHERS

PCS

220

PCS/H

3.00

73.33

16

M16 WITH 1 NUTS & PLAIN WASHERS

PCS

12

PCS/H

3.00

4.00

17

PAVING & GRADING

SQM

198

SQM/H

18

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

SQM

12

SQM/H

2.00

6.00

19

PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA

LM

1

LM/H

6.00

0.17

STRUCTURAL STEEL WORKS 1

STRUCTURAL STEEL FABRICATION

KG

20727.07

Kg/H

38

545.45

2

STRUCTURAL STEEL ERECTION

KG

20727.07

Kg/H

72

287.88

3

STEELGRATING:30x5mm BEARING BAR AT 30 PITCH

SQM

59.11

SQM/H

1.5

39.41

4

STEEL HANDRAIL

LM

80.36

LM/H

0.8

100.45

5

STEEL CAGED LADDER(7.3M HIGH)

SET

1

SET/H

0.01

108.00

6

STEEL LADDER(2.45M HIGH)

SET

2

SET/H

0.01

72.00

115.15

Page 142 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHN DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

7

STEEL LADDER(1.5M HIGH)

8

BOL & NUTS WITH PLAIN WASHER

9

M16 WITH 2 NUTS & PLAIN WASHERS

10

M20WITH 2 NUTS & PLAIN WASHERS

UNIT

TOTAL PRODUCTIVIT ESTIAMTED Y UNIT

PRODUCTIVITY MACHINE

HAND

TOTAL HOURS

SKILLED WORKER HOURS

LABOUR HOURS

1

SET/H

0.03

36.00

PCS

168

PCS/H

8.00

21.00

21.00

PCS

150

PCS/H

8.00

18.75

18.75

EA

1

EA/H

0.01

125.00

LM/H

1.20

499.17

SET

MARK

MECHANICAL 1

SEPARATOR INSTALLATION PIPING

1

TOTAL LENGTH

LM

599

2

Nos. of WELDS

EA

730

3

DIN (Fabrication)

DIN

1857

DIN/H

3.00

619.00

4

DIN (Erection)

DIN

1857

DIN/H

1.50

1,238.00

5

Nos. of RADIOGRAPHS

PC

3254

FILM/H

4.00

813.50

6

TIE-INS SHUTDOWN

EA

15

EA/H

0.01

1,680.00

7

TIE-INS NON SHUTDOWN

EA

3

EA/H

0.01

336.00

8

PWHT

EA

457

EA/H

0.67

682.09

ELECTRICAL 1

Low Voltage cable

2

cable gland

3

earthing cable

4

earth rod

LM

700

LM/H

6.00

116.67

PCS

14

PCS/H

0.50

28.00

LM

130

LM/H

8.90

14.61

PCS

3

PCS/H

0.22

13.50

5

earth busbar

PCS

3

PCS/H

0.25

12.00

6

exothermic weld (T-JOINT) and connector

PCS

29

PCS/H

0.50

58.00

7 8 9 10 11 12 13

EARTH BOSS cable tray cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes

PCS LM PCS PCS PCS PCS PCS

1 140 5 0 1 15 15

PCS/H LM/H PCS/H PCS/H PCS/H PCS/H PCS/H

0.13 0.57 0.25

8.00 245.61 20.00

0.13 0.50 0.25

8.00 30.00 60.00

116.67 14.61

Page 143 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHN DEGASSING STATION ITEM NUMBER 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

ACTIVITY DESCRIPTION conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate

UNIT

TOTAL PRODUCTIVIT ESTIAMTED Y UNIT

PRODUCTIVITY MACHINE

HAND

TOTAL HOURS

SKILLED WORKER HOURS

PCS PCS PCS PCS PCS

1 1 10 1 1

PCS/H PCS/H PCS/H PCS/H PCS/H

0.01 0.01 0.06 0.13 0.13

180.00 180.00 160.00 8.00 8.00

SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS

6 4 3 5 5 2 5 1 3 5 5 3 1 1 2 3 1 2 12 6192 139 19 143 92 237 49 22 14 189

SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H PCS/H LM/H PCS/H LM/H LM/H PCS/H SET/H LM/H LM/H LM/H PCS/H

0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20 0.20 0.20 0.13 0.13 0.13 0.13 0.13 0.50 0.13 6.00 0.50 0.57 1.00 1.00 8.00 0.30 0.20 0.50 2.00

24.00 16.00 12.00 20.00 10.00 4.00 40.00 8.00 15.00 25.00 25.00 15.00 8.00 8.00 16.00 24.00 8.00 4.00 96.00 1,032.00 278.00 33.33 143.00 92.00 29.63 163.33 110.00 28.00 94.50

LABOUR HOURS

MARK

1,032.00 33.33

28.00

Page 144 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHN DEGASSING STATION ITEM NUMBER 30 31 1 2 3 4 1 2 3 1 2 3 4 1 2

ACTIVITY DESCRIPTION sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests

UNIT

TOTAL PRODUCTIVIT ESTIAMTED Y UNIT

PRODUCTIVITY MACHINE

HAND

TOTAL HOURS

SKILLED WORKER HOURS

LABOUR HOURS

PCS PCS

22 32

PCS/H PCS/H

2.00 3.00

11.00 10.67

SQM SQM SQM SQM

526.65 410.817787 57.7080504 536.65

SQM/H SQM/H SQM/H SQM/H

0.50 0.40 0.25 0.50

1,053.30 1,027.04 230.83 1,073.30

526.65 410.82 92.33 429.32

TON CUM EA

16.82 29.3943 1

Kg/H CUM/H EA/H

48.00 1.00 0.01

350.42 29.39 83.33

175.21 29.39

SET SET SET SET

1 1 1 1

SET/H SET/H SET/H SET/H

0.00 0.01 0.00 0.00

400.00 200.00 400.00 400.00

SET SET

1 1

SET/H SET/H

0.00 0.00

800.00 640.00

MARK

Page 145 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHS DEGASSING STATION ITEM NUMBE R

ACTIVITY DESCRIPTION

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED

SKILLED WORKER HOURS

1

CIVIL WORKS EXCAVATION

CUM

684.62

CUM/H

120.00

0.25

142

2

BACKFILL

CUM

598.57

CUM/H

60.00

0.12

259

3

STRUCTURE CONCRETE: C40

CUM

82.19

CUM/H

3.00

0.30

101

101

4

BLINDING CONCRETE

CUM

13.25

CUM/H

0.30

44

44

5

CONCRETE SCREED

CUM

3.90

CUM/H

0.30

13

13

6

CONCRETE PROTECTION BELOW GRADE LEVEL

SQM

330.90

SQM/H

8.00

41

41

7

CONCRETE PROTECTION ABOVE GRADE LEVEL

SQM

72.48

SQM/H

8.00

9

9

8

0.25mm POLYETHYLENE SHEET

SQM

187.87

SQM/H

4.80

39

39

LABOUR HOURS

MARK

142 259

9

NON-SHRINK LEVELING GROUT

CUM

0.54

CUM/H

0.26

2

2

10

REINFORCEMENT BARS

TON

9.04

Kg/H

0.02

452

452

11

FORMWORKS

SQM

328.77

SQM/H

0.70

470

470

12

FORMWORKS REMOVAL

SQM

328.77

SQM/H

1.40

235

235

13

ANCHOR BOLTS:(GALVANISED)

14

M24 WITH 2 NUTS & PLAIN WASHERS

PCS

8.00

PCS/H

3.00

3

3

15

M20 WITH 2 NUTS & PLAIN WASHERS

PCS

204.00

PCS/H

3.00

68

68

16

M16 WITH 1 NUTS & PLAIN WASHERS

PCS

12.00

PCS/H

3.00

4

4

17

PAVING & GRADING

SQM

52.00

SQM/H

18

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

SQM

12.00

SQM/H

2.00

6

6

19

PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA

LM

1.00

LM/H

6.00

0

0

STRUCTURAL STEEL WORKS 1

STRUCTURAL STEEL FABRICATION

KG

16301.85

Kg/H

38

429

429

2

STRUCTURAL STEEL ERECTION

KG

16301.85

Kg/H

72

226

136

3

STEELGRATING:30x5mm BEARING BAR AT 30 PITCH

SQM

59.11

SQM/H

1.5

39

39

4

STEEL HANDRAIL

LM

80.36

LM/H

0.8

100

100

5

STEEL CAGED LADDER(7.3M HIGH)

SET

1

SET/H

0.01

108

108

6

STEEL LADDER(2.45M HIGH)

SET

2

SET/H

0.01

72

72

7

STEEL LADDER(1.5M HIGH)

SET

1

SET/H

0.03

36

36

91

Page 146 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHS DEGASSING STATION ITEM ACTIVITY DESCRIPTION NUMBE R 8 BOLT & NUTS WITH PLAIN WASHER

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT MACHINE HAND HOURS ED

SKILLED WORKER HOURS

LABOUR HOURS

9

M16 WITH 2 NUTS & PLAIN WASHERS

PCS

168

PCS/H

8.00

21

21

10

M20WITH 2 NUTS & PLAIN WASHERS

PCS

150

PCS/H

8.00

19

19

EA

1

EA/H

0.01

125

125

LM/H

1.20

461

461

MARK

MECHANICAL 1

SEPARATOR INSTALLATION PIPING

1

TOTAL LENGTH

LM

553

2

Nos. of WELDS

EA

815

3

DIN (Fabrication)

DIN

1742

DIN/H

3.00

581

581

4

DIN (Erection)

DIN

1742

DIN/H

1.50

1161

1161

5

Nos. of RADIOGRAPHS

PC

3129

FILM/H

4.00

782

782

6

TIE-INS SHUTDOWN

EA

12

EA/H

0.01

1344

1344

7

TIE-INS NON SHUTDOWN

EA

4

EA/H

0.01

448

448

8

PWHT

EA

436

EA/H

0.67

651

651

ELECTRICAL 1

Low Voltage cable

2

cable gland

3

earthing cable

4

earth rod

5

earth busbar

6

exothermic weld (T-JOINT) and connector

7

EARTH BOSS

8

cable tray

9 10 11 12 13 14 15

cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials

LM

500

LM/H

6.00

83

PCS

14

PCS/H

0.50

28

LM

130

LM/H

8.90

15

PCS

3

PCS/H

0.22

14

PCS

3

PCS/H

0.25

12

12

PCS

29

PCS/H

0.50

58

58

PCS

1

PCS/H

0.13

8

8

LM

140

LM/H

0.57

246

246

PCS PCS PCS PCS PCS PCS PCS

9 3 1 15 15 1 1

PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H

0.25

36

0.13 0.50 0.25 0.01 0.01

8 30 60 180 180

36 0 8 30 60 180 180

83 28 15 14

Page 147 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHS DEGASSING STATION ITEM ACTIVITY DESCRIPTION NUMBE R 16 concrete duck bank(sulphate resistant) 17 junction box for fed lighting 18 junction box for fed AC UPS loads INSTRUMENTATION 1 pressure transmitter 2 tempreture transmitter 3 flow transmitter 4 level transmitter 5 pressure guage 6 tempreture guage 7 control valve 8 cut off valve 9 restriction orifice 10 flammable gas detector 11 toxic gas detector 12 infrared radiation flame detector 13 manual call point 14 sounder 15 beacon 16 relief valve 17 analyzer transmitter 18 level guage 19 junction box 20 cable 21 cable gland 22 cable tray 23 stainless tube 24 pipe fittings 25 bolts/nuts 26 hot galvanizing angle steel 27 hot galvanizing channel steel 28 hot galvanizing pipe 29 steel plate 30 sunshade 31 nameplate COATING & FIREPROOFING

UNIT PCS PCS PCS SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS PCS PCS

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT MACHINE HAND HOURS ED 0.06 8 PCS/H 128 0.13 1 PCS/H 8 0.13 1 PCS/H 8 6 4 3 5 5 2 5 1 3 5 5 3 1 1 2 3 1 2 12 2790 139 19 139 92 237 49 22 14 189 22 32

SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H PCS/H LM/H PCS/H LM/H LM/H PCS/H SET/H LM/H LM/H LM/H PCS/H PCS/H PCS/H

0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20 0.20 0.20 0.13 0.13 0.13 0.13 0.13 0.50 0.13 6.00 0.50 0.57 1.00 1.00 8.00 0.30 0.20 0.50 2.00 2.00 3.00

24 16 12 20 10 4 40 8 15 25 25 15 8 8 16 24 8 4 96 465 278 33 139 92 30 163 110 28 95 11 11

SKILLED WORKER HOURS 128 8 8 0 24 16 12 20 10 4 40 8 15 25 25 15 8 8 16 24 8 4 96

LABOUR HOURS

MARK

465 278 33 139 92 30 163 110 28 95 11 11

Page 148 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHS DEGASSING STATION ITEM NUMBE R 1 2 3 4 1 2 3 1 2 3 4 1 2

ACTIVITY DESCRIPTION STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests

UNIT SQM SQM SQM SQM

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT MACHINE HAND HOURS ED 0.50 442.5 SQM/H 885 0.40 337.0503 SQM/H 843 0.25 83.81407 SQM/H 335 0.50 452.5 SQM/H 905

SKILLED WORKER HOURS 443 506 201 543

TON CUM EA

12 29.3943 1

Kg/H CUM/H EA/H

48.00 1.00 0.01

250 29 83

125

SET SET SET SET

1 1 1 1

SET/H SET/H SET/H SET/H

0.00 0.01 0.00 0.00

400 200 400 400

400 200 400 400

SET SET

1 1

SET/H SET/H

0.00 0.00

800 640

800 640

LABOUR HOURS

MARK

443 337 134 362 125 29

83

Page 149 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR JALM DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED

SKILLED WORKER HOURS

LABOUR HOURS

1

CIVIL WORKS EXCAVATION

CUM

758.57

CUM/H

120.00

0.25

158

158

2

BACKFILL

CUM

662.96

CUM/H

60.00

0.12

287

287

3

STRUCTURE CONCRETE: C40

CUM

91.17

CUM/H

3.00

0.30

112

112

4

BLINDING CONCRETE

CUM

14.33

CUM/H

0.30

48

48

5

CONCRETE SCREED

CUM

4.36

CUM/H

0.30

15

15

6

CONCRETE PROTECTION BELOW GRADE LEVEL

SQM

370.43

SQM/H

8.00

46

46

7

CONCRETE PROTECTION ABOVE GRADE LEVEL

SQM

76.28

SQM/H

8.00

10

10

8

0.25mm POLYETHYLENE SHEET

SQM

204.36

SQM/H

4.80

43

43

9

NON-SHRINK LEVELING GROUT

CUM

0.64

CUM/H

0.26

2

2

10

REINFORCEMENT BARS

TON

10.03

Kg/H

0.02

501

501

11

FORMWORKS

SQM

364.75

SQM/H

0.70

521

521

12

FORMWORKS REMOVAL

SQM

364.75

SQM/H

1.40

261

261

13

ANCHOR BOLTS:(GALVANISED)

14

M24 WITH 2 NUTS & PLAIN WASHERS

PCS

8.00

PCS/H

3.00

3

3

15

M20 WITH 2 NUTS & PLAIN WASHERS

PCS

220.00

PCS/H

3.00

73

73

16

M16 WITH 1 NUTS & PLAIN WASHERS

PCS

4.00

PCS/H

3.00

1

1

17

PAVING & GRADING

SQM

185.00

SQM/H

18

RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)

SQM

24.00

SQM/H

2.00

12

12

19

PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA

LM

305.00

LM/H

6.00

51

51

20

CONCRETE KERB (RETAINING WALL & CULVERT)

CUM

90.00

CUM/H

0.42

214

214

MARK

STRUCTURAL STEEL WORKS 1

STRUCTURAL STEEL FABRICATION

KG

16529.77

Kg/H

38

435

435

2

STRUCTURAL STEEL ERECTION

KG

16529.77

Kg/H

72

230

138

3

STEELGRATING:30x5mm BEARING BAR AT 30 PITCH

SQM

64.24

SQM/H

1.5

43

43

4

STEEL HANDRAIL

LM

72.84

LM/H

0.8

91

91

5

STEEL CAGED LADDER(7.3M HIGH)

SET

0

SET/H

0.01

108

108

92

Page 150 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR JALM DEGASSING STATION ITEM NUMBER

ACTIVITY DESCRIPTION

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED

SKILLED WORKER HOURS

6

STEEL LADDER(2.45M HIGH)

SET

0

SET/H

0.01

72

7

STEEL LADDER(1.5M HIGH)

SET

0

SET/H

0.03

36

36

8

CRASH BARRIER

LM

51.6

LM/H

0.25

206

206

LABOUR HOURS

MARK

72

9

BOLT & NUTS WITH PLAIN WASHER

10

M16 WITH 2 NUTS & PLAIN WASHERS

PCS

169

PCS/H

8.00

21

21

11

M20WITH 2 NUTS & PLAIN WASHERS

PCS

150

PCS/H

8.00

19

19

EA

1

EA/H

0.01

125

125

LM/H

1.20

592

592

MECHANICAL 1

SEPARATOR INSTALLATION PIPING

1

TOTAL LENGTH

LM

710

2

Nos. of WELDS

EA

1640

3

DIN (Fabrication)

DIN

1673

DIN/H

3.00

558

558

4

DIN (Erection)

DIN

1673

DIN/H

1.50

1115

1115

5

Nos. of RADIOGRAPHS

PC

3772

FILM/H

4.00

943

943

6

TIE-INS SHUTDOWN

EA

16

EA/H

0.01

1792

1792

7

TIE-INS NON SHUTDOWN

EA

2

EA/H

0.01

224

224

8

PWHT

EA

564

EA/H

0.67

842

842

ELECTRICAL 1

Low Voltage cable

2

cable gland

LM

1550

LM/H

6.00

258

PCS

14

PCS/H

0.50

28

258 28

3

earthing cable

LM

130

LM/H

8.90

15

4

earth rod

PCS

4

PCS/H

0.22

18

18

5

earth busbar

PCS

23

PCS/H

0.25

92

92

6

exothermic weld (T-JOINT) and connector

PCS

1

PCS/H

0.50

2

2

7

EARTH BOSS

PCS

1

PCS/H

0.13

8

8

8

cable tray

LM

140

LM/H

0.57

246

246

9 10

cable tray elbow cable tray tee

PCS PCS

6 1

PCS/H PCS/H

0.25

24

24 0

15

Page 151 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR JALM DEGASSING STATION ITEM NUMBER 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

ACTIVITY DESCRIPTION welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED

PCS PCS PCS PCS PCS PCS PCS PCS

1 14 14 1 1 18 1 1

PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H

0.13 0.50 0.25 0.01 0.01 0.06 0.13 0.13

8 28 56 180 180 288 8 8

SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM

6 4 3 5 5 2 5 1 3 5 5 3 1 1 2 3 1 2 12 6516 143 19 139 92 216 49 22

SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H PCS/H LM/H PCS/H LM/H LM/H PCS/H SET/H LM/H LM/H

0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20 0.20 0.20 0.13 0.13 0.13 0.13 0.13 0.50 0.13 6.00 0.50 0.57 1.00 1.00 8.00 0.30 0.20

24 16 12 20 10 4 40 8 15 25 25 15 8 8 16 24 8 4 96 1086 286 33 139 92 27 163 110

SKILLED WORKER HOURS

LABOUR HOURS

MARK

8 28 56 180 180 288 8 8 0 24 16 12 20 10 4 40 8 15 25 25 15 8 8 16 24 8 4 96 1086 286 33 139 92 27 163 110

Page 152 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR JALM DEGASSING STATION ITEM NUMBER 28 29 30 31 1 2 3 4 1 2 3 4 1 2 3 4 1 2

ACTIVITY DESCRIPTION hot galvanizing pipe steel plate sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS EXCAVATION FOR CONCRETE KERB (RETAINING WALL & CULVERT) SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests

UNIT

TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED

SKILLED WORKER HOURS

LABOUR HOURS

LM PCS PCS PCS

46 208 22 32

LM/H PCS/H PCS/H PCS/H

0.50 2.00 2.00 3.00

92 104 11 11

104 11 11

SQM SQM SQM SQM

461.37 441.4491 67.68895 471.37

SQM/H SQM/H SQM/H SQM/H

0.50 0.40 0.25 0.50

923 1104 271 943

461 662 162 566

461 441 108 377

TON CUM CUM EA

13.42 28.46599 345 1

Kg/H CUM/H CUM/H EA/H

48.00 1.00 1.00 0.01

280 28 345 83

140

140 28

SET SET SET SET

1 1 1 1

SET/H SET/H SET/H SET/H

0.00 0.01 0.00 0.00

400 200 400 400

400 200 400 400

SET SET

1 1

SET/H SET/H

0.00 0.00

800 640

800 640

MARK

92

345 83

Page 153 of 170

PROJECT PLANNING PACKAGE

Attachment 14

INVOICE FORMAT

Page 154 of 170

EPIC FOR  REPLACEMENT OF OLD 3‐PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN  (PROJECT NO. 3963)

INVOICE Part 1 1.1

Invoice No.

XXXXX

1.3

Vendor Number

XXXXX

1.2  Date 1‐May‐17

29‐Jun‐17

1.4

Period of work done/ invoiced : From : 

1.5

Contract No.

End :

28‐Jun‐17

1.6

Contract Title

1.7

Release Order No

XXXXX

1.8

Service Entry Sheet No: 

XXXXX

2.1

Original Contract Value

2.2

Variations if Any (+/‐)

                                                                                                                  ‐

2.3

Current Contract Value

                                                                                                 43,453,804.00 QR

3.1

Total Advance Paid:

                                                                                                                  ‐

QR

3.2

Advance recovered till last Invoice

                                                                                                                  ‐

QR

3.3

Balance advance to be recovered as of date

                                                                                                                  ‐

QR

4.1

Cummulative Value of work done/ Invoiced as of date

                                                                                                                  ‐

QR

4.2

Less : Value of work done upto last invoice

                                                                                                                  ‐

QR

4.3

Gross value of work done as per this invoice

                                                                                                                  ‐

QR

5.1

Gross Value of work done as per this invoice

                                                                                                                  ‐

QR

5.2

Less : Advance

                                                                                                                  ‐

QR

5.3

Less : Retention as per this Invoice

                                                                                                                  ‐

QR

5.4

Less : Liquidated Damages as per this Invoice

                                                                                                                  ‐

QR

5.5

Net amount claimed as per this Invoice

                                                                                                                  ‐

QR

5.6

Amount in Words :

01

GC16101100

EPIC FOR REPLACING OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN

Part 2                                                                                                  43,453,804.00 QR QR

Part 3

Part 4

Part 5

QATAR RIYALS FOUR HUNDRED TWO THOUSAND THREE HUNDRED SIXTY EIGHT AND TWENTY TWO DHIRAMS ONLY

Part 6 6.1 6.2 6.3

Authorized Signature Name of Authorized Signatory Designation

Company seal

Page 155 of 170

GC16101100 EPIC FOR REPLACING OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN SUMMARY

Item 2.2.1.1 1 2 3 4 5 2.2.1.4.2.d 6 2.2.2 7

METHODOLOGY OF PAYMENT  Cummulative till last Invoice LUMP SUM FOR THE LUMP SUM AMOUNT  ITEM DESCRIPTION  AMOUNT (QAR) % progress Amount QR. (QAR) App B Part 1 clause 2.2.1.1  Ninety five percent 95% of the LUMP PRICE portion is based on physical progress for the month Preliminaries & General Matters         6,039,699.00                                5,737,714.05 Detailed Engineering         1,602,400.00                                1,522,280.00 Procurement       26,216,175.00                              20,972,940.00 Construction         8,446,830.00                                8,024,488.50  Pre‐Commissioning, Commissioning & Operational Testing         1,148,700.00                                1,091,265.00 Full value of Procurement Full value of Procurement Completion of the commissioning and                                5,243,235.00 testing for the WORK excluding project dossier and As‐built drawings Completion of following activities / deliverables:  Completion of SPIR, SAP,CMMS and Handing over of Spare parts,  As‐Built drawings,                                    861,881.45  Project Dossiers,  Close out report, Asset Capitalization Schedule TOTAL (DETAILED ENGINEERING DESIGN)       43,453,804.00                              43,453,804.00 0.00%                           ‐

2 of 16

This Invoice % progress

Amount QR.

0.00%                           ‐

Date: Cummulative upto this invoice % progress

Amount QR.

0.00%                           ‐

Page 156 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING (PROJECT NO. 3963) Cost (QR) Level‐2 Level‐3            457,603.00           157,248.00

OVERALL Preliminaries Article 11.7 : Performance Bond Appendix ‐ C : Insurance Specific to the Contract

Cummulative till last Invoice % progress Amount QR.

This Invoice % progress

Amount QR.

Cummulative upto this invoice % progress Amount QR.

          300,355.00

GENERAL MATTERS         5,582,096.00 Mobilisation of all supervision, labour, plant,  materials and equipment necessary for the proper            391,323.00 execution of the WORK. De‐mobilisation of all supervision, labour, plant,  materials and equipment necessary for the proper            201,013.00 execution of the WORK. WORKSITE Facilities and Utilities Provision, maintenance and subsequently removal  of all temporary office, site facilities and utilities at  WORKSITE for CONTRACTOR and SUBCONTRACTOR        1,958,130.00 personnel as required for the COMPLETION of the  WORK. Provision of project planning/management, QA/QC  activities, proprietary design softwares, liasion and  all office overhead necessary for the proper  execution of the WORK.

      1,870,087.00

Provision of all temporary works as required for the  COMPLETION of the WORK.

          651,626.00

Provision of compliance with CONTRACT terms and  conditions regarding obtaining QP permit to WORK,  entry permit, ID cards, Inductions, Safetywear etc.

          286,317.00

Provision of progress and safety meeting with QP.

            44,790.00

Provision of Asset Capitalization Schedule Compilation and entry of required data for all  supplied items in QP's computerised Maintenance  Management System (CMMS) Provision for Digital Data for GIS as described in the  CONTRACT.  Provision of Project Dossiers includung As‐Built  Drawings, Construction Data Books,  and start ‐up,   Operation and Maintenance Manuals as described  in the CONTRACT.  Total         6,039,699.00

            30,457.00

Progress Percentage Calculation for Preliminaries and General Matters as per Appendix B Clause 2.0 DESIGN & DETAILED ENGINEERING PROCUREMENT CONSTRUCTION PRE-COMMISSIONING & COMMISSIONING

% Progress of Preliminaries

Schedule Price

        1,602,400.00       26,216,175.00         8,446,830.00         1,148,700.00 Total       37,414,105.00

            64,641.00             20,069.00

            63,643.00

Progress as on date

                        ‐                         ‐                         ‐                         ‐                         ‐ 0.00%

Refer to App B Part I, 2.2.1.2 Refer to App B Part I, 2.2.1.2 Refer to App B Part I, 2.2.1.2 Refer to App B Part I, 2.2.1.2 Refer to App B Part I, 2.2.1.2

1 of 14 

Page 157 of 170

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)

Detailed Engineering

Date: ITEM

DESCRIPTION

LUMP SUM  AMOUNT (QAR)

Cummulative till last Invoice 95% OF LUMP SUM  Amount QR. AMOUNT (QAR) % progress

This Invoice % progress

Amount QR.

Cummulative upto this invoice % progress

Amount QR.

2.2.1.1 App B Part 1 clause 2.2.1.1  Ninety five percent 95% of the LUMP PRICE portion is based on physical progress for the month

Schedule 02: Detailed Engineering A

B

C

D

E

F

G

H

I

J

K

L

M

Site Survey and Document Retrieval, as required in Scope of Work Clause 4.2, Appendix A and reference drawings. Prepare and submit for QP review and approval the Design Basis Memorandum including relevant detail design drawings as required in Scope of Work Clause 4.3, Appendix A. Prepare and submit Process engineering deliverables as required in Scope of Work Clause 4.4.2, Appendix A and reference drawings. Prepare and submit Mechanical/Piping engineering deliverables as required in Scope of Work Clause 4.4.3, Appendix A and reference drawings. Prepare and submit Instrumentation and Control System engineering deliverables as required in Scope of Work Clause 4.4.5, Appendix A and reference drawings. Prepare and submit Electrical engineering deliverables as required in Scope of Work Clause 4.4.6, Appendix A and reference drawings. Prepare and submit Civil/Structural engineering deliverables as required in Scope of Work Clause 4.4.7, Appendix A and reference drawings. Prepare and submit Loss Prevention engineering deliverables as required in Scope of Work Clause 4.4.9 Appendix A and reference drawings. Prepare and submit Environmental engineering deliverables as required in Scope of Work Clause 4.4.10, Appendix A and reference drawings. Prepare and submit Demolition engineering deliverables as required in Scope of Work Clause 4.4.14, Appendix A and reference drawings. Prepare and submit Tie-in Engineering Package & Tie-in Schedule as required in Scope of Work Clause 4.4.15, Appendix A and reference drawings. Carry out and implement HAZID and HAZOP Studies as required in Scope of Work Clause 4.4.9, Appendix A and reference drawings. Prepare and submit list for Spare Parts requirements for Second and Third Year of Operation, all as required in Scope of Work Clause 4.5.6, Appendix A.

Total Detailed Engineering

56,530.00

53,703.50

123,061.00

116,907.95

189,591.00

180,111.45

246,121.00

233,814.95

246,121.00

233,814.95

133,061.00

126,407.95

133,061.00

126,407.95

169,591.00

161,111.45

113,061.00

107,407.95

56,530.00

53,703.50

67,836.00

64,444.20

56,530.00

53,703.50

11,306.00

10,740.70

1,602,400.00

1,522,280.00

Page 158 of 170 1 of 14

CONTRACT NO: GC16110300 EPIC FOR EXTENSION OF MANIFOLDS TO CREATE ADDITIONAL SLOTS AT KN AND KS IN DUKHAN  Procurement Item

DESCRIPTION

Cummulative till last Invoice 80%  LUMP SUM  AMOUNT (QAR)   OF LUMP SUM  AMOUNT  % progress Amount QR. (QAR) 

Schedule 03: Procurement 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 1.1.9 1.1.10 1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.3 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.6 1.6.1 2 2.1 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.2 2.2.1

KHATIYAH NORTH     Mechanical and Piping (10) Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control (6) All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems  Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring  etc.) Any Other Item/Material Electrical   (8) Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention  (3) Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural  (1) Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables  (1) KHATIYAH MAIN    Mechanical and Piping  Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories

This Invoice

% progress

Amount QR.

Cummulative upto this invoice

% progress

Amount QR.

-

                      438,760.00                        118,181.00                           50,530.00                           79,981.00                           23,283.00                             2,959.00                        255,715.00                           19,691.00                           13,224.00                           22,407.00                        367,549.00                        429,319.00                        276,926.00                        145,930.00 

               351,008.00                    94,544.80                    40,424.00                    63,984.80                    18,626.40                      2,367.20                 204,572.00                    15,752.80                    10,579.20                    17,925.60                                  ‐                   294,039.20                 343,455.20                 221,540.80                 116,744.00 

                      415,389.00                 332,311.20                                         ‐                                    ‐                                    ‐                             22,475.00                    17,980.00                             1,684.00                      1,347.20                             8,056.00                      6,444.80                             6,162.00                      4,929.60                                         ‐                                    ‐                                           ‐                                    ‐                             15,631.00                    12,504.80                                         ‐                                    ‐                                    ‐                          111,245.00                    88,996.00                        417,462.00                 333,969.60                                         ‐                                    ‐                                    ‐                          250,769.00                 200,615.20                                  ‐                                           ‐                                    ‐                                    ‐                                    ‐                          430,705.00                 344,564.00                        118,181.00                    94,544.80                           50,530.00                    40,424.00                           86,355.00                    69,084.00                           19,334.00                    15,467.20                             2,223.00                      1,778.40                        280,423.00                 224,338.40                           20,474.00                    16,379.20                           10,981.00                      8,784.80                           11,851.00                      9,480.80                                  ‐                          367,549.00                 294,039.20 

Page 159 of 170 14 of 14

Item 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7 2.3.8 2.4 2.4.1 2.4.2 2.4.3 2.5 2.5.1 2.6 2.6.1 3 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.4 3.4.1 3.4.2 3.4.3 3.5 3.5.1 3.6 3.6.1 4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5

DESCRIPTION All Control System Equipment and accessories Softwares for I & C Integration with existing systems  Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring  etc.) Any Other Item/Material Electrical  Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention  Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables KHATIYAH SOUTH    Mechanical and Piping  Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems  Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring  etc.) Any Other Item/Material Electrical  Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention  Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables FAHAHIL NORTH    Mechanical and Piping  Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges

LUMP SUM

80%

Cummulative till last Invoice

This Invoice

Cummulative upto this invoice

                      350,797.00                 280,637.60                        276,926.00                 221,540.80                        145,930.00                 116,744.00                        415,389.00                 332,311.20                                         ‐                                    ‐                                    ‐                             22,475.00                    17,980.00                             1,684.00                      1,347.20                             8,056.00                      6,444.80                             6,162.00                      4,929.60                                         ‐                                    ‐                                           ‐                                    ‐                             15,631.00                    12,504.80                                         ‐                                    ‐                                    ‐                          111,245.00                    88,996.00                        417,462.00                 333,969.60                                         ‐                                    ‐                                    ‐                          291,169.00                 232,935.20                                  ‐                                           ‐                                    ‐                                    ‐                                    ‐                          430,705.00                 344,564.00                        118,181.00                    94,544.80                           50,530.00                    40,424.00                           80,053.00                    64,042.40                          15,971.00                   12,776.80                            1,938.00                     1,550.40                        273,887.00                219,109.60                          19,358.00                   15,486.40                            9,071.00                     7,256.80                          11,851.00                     9,480.80                                  ‐                          367,549.00                294,039.20                        350,797.00                280,637.60                        276,926.00                221,540.80                        145,930.00                116,744.00                        415,389.00                332,311.20                                      ‐                         22,475.00                           1,684.00                           8,056.00                           6,162.00                                     ‐                                     ‐                         15,631.00                                     ‐                       111,245.00                       417,462.00                                     ‐                       279,357.00                                     ‐

                      430,705.00                       118,181.00                         50,530.00                       130,535.00                         27,875.00

                                ‐                                    ‐                      17,980.00                      1,347.20                      6,444.80                      4,929.60                                  ‐                                    ‐                      12,504.80                                  ‐                                    ‐                      88,996.00                 333,969.60                                  ‐                                    ‐                   223,485.60                                  ‐                                    ‐                                    ‐                                    ‐                   344,564.00                    94,544.80                    40,424.00                 104,428.00                    22,300.00 

Page 160 of 170 14 of 14

Item 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.3 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.4 4.4.1 4.4.2 4.4.3 4.5 4.5.1 4.6 4.6.1 5 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 5.2 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.3.6 5.3.7 5.3.8 5.4 5.4.1 5.4.2 5.4.3 5.5 5.5.1 5.6 5.6.1

DESCRIPTION Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems  Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring  etc.) Any Other Item/Material Electrical  Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention  Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables FAHAHIL MAIN    Mechanical and Piping  Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems  Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring  etc.) Any Other Item/Material Electrical  Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention  Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables

LUMP SUM

                          3,824.00                       272,482.00                         29,956.00                         15,831.00                         11,851.00                       367,549.00                        350,797.00                        276,926.00                        145,930.00 

80%

Cummulative till last Invoice

This Invoice

Cummulative upto this invoice

                    3,059.20                 217,985.60                    23,964.80                    12,664.80                      9,480.80                                  ‐                   294,039.20                 280,637.60                 221,540.80                 116,744.00 

                      415,389.00                 332,311.20                                         ‐                                    ‐                                    ‐                             22,475.00                    17,980.00                             1,684.00                      1,347.20                             8,056.00                      6,444.80                             6,162.00                      4,929.60                                         ‐                                    ‐                                           ‐                                    ‐                             15,631.00                    12,504.80                                         ‐                                    ‐                                    ‐                          111,245.00                    88,996.00                        417,462.00                 333,969.60                                         ‐                                    ‐                                    ‐                          400,929.00                 320,743.20                                  ‐                                           ‐                                    ‐                                    ‐                                    ‐                          430,705.00                 344,564.00                        118,181.00                    94,544.80                           50,530.00                    40,424.00                           73,841.00                    59,072.80                           16,321.00                    13,056.80                             2,588.00                      2,070.40                        223,361.00                 178,688.80                           24,227.00                    19,381.60                             9,270.00                      7,416.00                           17,776.00                    14,220.80                                  ‐                          367,549.00                 294,039.20                        350,797.00                 280,637.60                        276,926.00                 221,540.80                        145,930.00                 116,744.00                        415,389.00                 332,311.20                                         ‐                                    ‐                                    ‐                             22,475.00                    17,980.00                             1,684.00                      1,347.20                             8,056.00                      6,444.80                             6,162.00                      4,929.60                                         ‐                                    ‐                                           ‐                                    ‐                             15,631.00                    12,504.80                                         ‐                                    ‐                                    ‐                          111,245.00                    88,996.00                        417,462.00                 333,969.60                                         ‐                                    ‐                                    ‐                          286,776.00                 229,420.80                                  ‐                                           ‐                                    ‐   

Page 161 of 170 14 of 14

Item 6 6.1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9 6.1.10 6.2 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.3 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5 6.3.6 6.3.7 6.3.8 6.4 6.4.1 6.4.2 6.4.3 6.5 6.5.1 6.6 6.6.1 7 7.1 7.1.1 7.1.2 7.1.3 7.1.4 7.1.5 7.1.6 7.1.7 7.1.8 7.1.9 7.1.10 7.2 7.2.1 7.2.2 7.2.3 7.2.4 7.2.5 7.2.6 7.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.3.8 7.4

DESCRIPTION FAHAHIL SOUTH Mechanical and Piping  Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems  Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring  etc.) Any Other Item/Material Electrical  Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention  Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables JALEHA     Mechanical and Piping  Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems  Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring  etc.) Any Other Item/Material Electrical   Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention 

LUMP SUM                       439,982.00                        147,727.00                           63,162.00                        146,232.00                           22,548.00                             3,051.00                        355,151.00                           32,831.00                           12,806.00                           14,813.00                        459,436.00                        438,496.00                        346,157.00                        182,412.00 

80%

Cummulative till last Invoice

This Invoice

Cummulative upto this invoice

                                ‐                                    ‐                   351,985.60                 118,181.60                    50,529.60                 116,985.60                    18,038.40                      2,440.80                 284,120.80                    26,264.80                    10,244.80                    11,850.40                                  ‐                   367,548.80                 350,796.80                 276,925.60                 145,929.60 

                      519,236.00                 415,388.80                                         ‐                                    ‐                                    ‐                             28,094.00                    22,475.20                             2,105.00                      1,684.00                           10,070.00                      8,056.00                             7,702.00                      6,161.60                                         ‐                                    ‐                                           ‐                                    ‐                             19,539.00                    15,631.20                                         ‐                                    ‐                                    ‐                          139,056.00                 111,244.80                        521,827.00                 417,461.60                                         ‐                                    ‐                                    ‐                          415,228.00                 332,182.40                                  ‐                                           ‐                                    ‐                                    ‐                                    ‐                          538,382.00                 430,705.60                        147,727.00                 118,181.60                           63,162.00                    50,529.60                        123,869.00                    99,095.20                           25,494.00                    20,395.20                             3,337.00                      2,669.60                        286,808.00                 229,446.40                           34,974.00                    27,979.20                           14,479.00                    11,583.20                           14,813.00                    11,850.40                                  ‐                          459,436.00                 367,548.80                        438,496.00                 350,796.80                        346,157.00                 276,925.60                        182,412.00                 145,929.60                        519,236.00                 415,388.80                                         ‐                                    ‐                                    ‐                             28,094.00                    22,475.20                             2,105.00                      1,684.00                           10,070.00                      8,056.00                             7,702.00                      6,161.60                                         ‐                                    ‐                                           ‐                                    ‐                             19,539.00                    15,631.20                                         ‐                                    ‐                                    ‐   

Page 162 of 170 14 of 14

Item 7.4.1 7.4.2 7.4.3 7.5 7.5.1 7.6 7.6.1 8 8.1 8.2

DESCRIPTION Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables SPARES Spares for Commissioning and start‐up, as required in Scope of Work Clause 4.5.6,  Appendix A.  Spares for Guarantee Period, as required in Scope of Work Clause 4.5.6, Appendix A. 

Total Procurement

LUMP SUM

80%

Cummulative till last Invoice

This Invoice

Cummulative upto this invoice

                      139,056.00                 111,244.80                        521,827.00                 417,461.60                                         ‐                                    ‐                                    ‐                          325,999.00                 260,799.20                                  ‐                                           ‐                                    ‐                                    ‐                          127,690.00                 102,152.00                           97,695.00                    78,156.00                   26,216,175.00            20,972,940.00 

0.00%                                       ‐

CONTRACTOR to split the aboave table into Bulk & Long lead items in terms of value for payment purposes.

Page 163 of 170 14 of 14

Equipment - Procurement Control Register for Invoice Project No. - 3963 "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" As Of : 06-Jul-17 SL. No.

Description

Plan/ Actual Date

Progress Scale

Issue Purchase Order 10%

QP inspected Successful Inspection and cleared commissioning cleared & FAT material at and handover site of spares 55%

80%

100%

1.0 LONG LEAD ITEMS 1

1.2 1.3

WTGE

2.1 3

0.15%

19-Jul-17

4-Jul-18

27-Jul-18

27-Jul-18

Test Separator BS&W Meter Sand Jetting Piping Early Tie-in Valves Instrumentation

3.1

Field Instrumentation

3.2

Control Valve / SD & BD Valve / PRV/ Orifice / Flow Meters

3.3 4 4.1

12.16% Actual Date Plan Date

9-Aug-17

Actual Date Plan Date

19-Jul-17

12-Feb-18

6-Apr-18

6-Apr-18 3.42%

4-Jul-18

27-Jul-18

27-Jul-18 1.47%

Modification of Existing System, Yokogawa,Emerson, Honey well Electrical Junction Box/Lighting Fixture

Plan Date

8-May-17

Actual Date

11-May-17

Plan Date

19-Oct-17

Actual Date Plan Date

23-Aug-17

Actual Date Plan Date

6-Sep-17

15-Aug-17

4-Oct-17

4-Oct-17 1.51%

5.1 5.2 5.3

Loss Preventation Fire Detection System Deluge Skids and Fire water Spray Nozzles Firefighting & Safety Equipment

2-Feb-18

12-Mar-18

12-Mar-18 10.63%

24-Feb-18

18-Apr-18

18-Apr-18 10.44%

27-Mar-18

4-May-18

4-May-18 20.01%

0.00% 0.00%

10.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

18-Sep-17

9-Dec-18

16-Jan-18

16-Jan-18 0.68%

0.00% 0.00%

Plan Date

23-Sep-17

Actual Date Plan Date

28-Sep-17

Actual Date Plan Date

28-Sep-17

Actual Date

0.00% 0.00%

10.00%

Actual Date Plan Date

0.00%

0.00%

Actual Date 5

% Phy. Comp. 0.15%

Equipment

Actual Date 2

% Progress

75.80%

Plan Date

1.1

% Weight

24-Feb-18

3-Apr-18

3-Apr-18 3.22%

2-Apr-18

10-May-18

10-May-18 10.86%

13-Feb-18

23-Mar-18

23-Mar-18 1.40%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Page 164 of 170

Bulk Material - Procurement Control Register for Invoice Project No. - 3963 "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" SL. No.

Description

Plan/ Actual Date

Progress Scale

Issue Purchase Order

Inspection cleared & FAT

QP inspected and cleared material at site

10%

55%

80%

Successful commissioning and handover of spares 100%

2.0 BULK MATERIAL 1 1.1

As Of : 06-Jul-17 % Weight WTGE

2.1

0.000%

Piping Bolts&Nuts/Gaskets

Plan Date

28-Aug-17

9-Nov-17

28-Nov-17

26-Dec-17 0.40%

Intrumentation Cable tray/cable/tubes & fittings

Plan Date

3.1

Electrical Cable Trays/cable

Plan Date

7-Nov-17

25-Dec-17

8-Jan-18

28-Jan-18 4.18%

Civil/Strctural Steel

4.1

Civle/Strctural Steel

Plan Date

18-Sep-17

5-Nov-17

24-Nov-17

23-Dec-17 0.87%

Early Tie-in Piping

2.1

Pipes Early Tie-ins

2.2 2.3 2.4 2.5 2.6

2.7

Early Tie-in Flanges Early Tie-in Fittings Ball Valve / GGC Valve Pipes Remaining Flanges

Remiaining Project Fittings

5-Oct-17

12-Nov-17

26-Nov-17

16-Dec-17 8.54%

Issue Purchase Order

Inspection cleared & FAT

QP inspected and cleared material at site

Plan Date

28-May-17

25-Jun-17

30-Jul-17

Actual Date Plan Date

28-May-17

Actual Date Plan Date

28-May-17

Actual Date Plan Date

10-Aug-17

Actual Date Plan Date

28-Aug-17

Actual Date Plan Date

28-Aug-17

Actual Date Plan Date

28-Aug-17

Actual Date

0.00% 0.00%

Actual Date 2

0.00% 0.00%

Actual Date 4

0.00% 0.00%

Actual Date 3

% Phy. Comp. 0.919%

24.20%

Actual Date 2

% Progress

0.00%

Successful commissioning and handover of spares

14-Aug-17

1.11% 25-Jun-17

31-Aug-17

13-Sep-17 0.23%

25-Jun-17

31-Aug-17

13-Sep-17 0.33%

18-Feb-18

4-Apr-18

16-Apr-18 6.00%

21-Nov-17

23-Dec-17

4-Jan-18 1.69%

21-Nov-17

23-Dec-17

4-Jan-18 0.35%

21-Nov-17

23-Dec-17

0.00%

4-Jan-18 0.49%

55.00% 0.00% 55.00% 0.00% 55.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Page 165 of 170

CONTRACT NO: GC16110300 EPIC FOR EXTENSION OF MANIFOLDS TO CREATE ADDITIONAL SLOTS AT KN AND KS IN DUKHAN  Construction Item

DESCRIPTION

95%

LUMP SUM  AMOUNT  (QAR)

Cummulative till last Invoice

OF LUMP SUM  AMOUNT  % progress (QAR)

Amount QR.

This Invoice % progress

Amount QR.

Cummulative upto this invoice % progress

Amount QR.

2.2.1.1 App B Part 1 clause 2.2.1.1  Ninety five percent 95% of the LUMP PRICE portion is based on physical progress for the month

Schedule 04: Construction 1

KHATIYAH NORTH

1.1 All “Mechanical/ Piping/ Machinery” construction works

210,537.00

200,010.15

All “Instrumentation & Controls” construction works

293,393.00

278,723.35

All “Electrical” construction works

177,334.00

168,467.30

All “Civil/Structural/Architectural” construction works

490,498.00

465,973.10

73,348.00

69,680.60

147,149.00

139,791.55

1.2

1.3

1.4

1.5 All “Loss Prevention” construction works

1.6

Demolition Work

1.7

Any Other Item

2

-

KHATIYAH MAIN

2.1 All “Mechanical/ Piping/ Machinery” construction works

172,493.00

163,868.35

All “Instrumentation & Controls” construction works

249,258.00

236,795.10

All “Electrical” construction works

145,290.00

138,025.50

All “Civil/Structural/Architectural” construction works

401,865.00

381,771.75

60,094.00

57,089.30

120,560.00

114,532.00

2.2

2.3

2.4

2.5 All “Loss Prevention” construction works

2.6

Demolition Work

2.7

Any Other Item

3

-

KHATIYAH SOUTH

Page 166 of 170 1 of 14

Item

DESCRIPTION

Cummulative till last Invoice

95%

LUMP SUM

This Invoice

Cummulative upto this invoice

3.1 All “Mechanical/ Piping/ Machinery” construction works

169,288.00

160,823.60

All “Instrumentation & Controls” construction works

235,911.00

224,115.45

All “Electrical” construction works

142,591.00

135,461.45

All “Civil/Structural/Architectural” construction works

394,399.00

374,679.05

58,978.00

56,029.10

118,320.00

112,404.00

-

-

3.2

3.3

3.4

3.5 All “Loss Prevention” construction works

3.6

Demolition Work

3.7

Any Other Item

4

FAHAHIL NORTH -

4.1 All “Mechanical/ Piping/ Machinery” construction works

156,146.00

148,338.70

All “Instrumentation & Controls” construction works

217,596.00

206,716.20

All “Electrical” construction works

131,520.00

124,944.00

All “Civil/Structural/Architectural” construction works

363,780.00

345,591.00

54,399.00

51,679.05

109,135.00

103,678.25

-

-

4.2

4.3

4.4

4.5 All “Loss Prevention” construction works

4.6

Demolition Work

4.7

Any Other Item

5

FAHAHIL MAIN -

5.1 All “Mechanical/ Piping/ Machinery” construction works

197,910.00

188,014.50

All “Instrumentation & Controls” construction works

275,797.00

262,007.15

All “Electrical” construction works

166,698.00

158,363.10

All “Civil/Structural/Architectural” construction works

461,081.00

438,026.95

68,949.00

65,501.55

138,324.00

131,407.80

-

-

5.2

5.3

5.4

5.5 All “Loss Prevention” construction works

5.6

Demolition Work

5.7

Any Other Item

Page 167 of 170 2 of 14

Item

6

DESCRIPTION

Cummulative till last Invoice

95%

LUMP SUM

This Invoice

Cummulative upto this invoice

FAHAHIL SOUTH -

6.1 All “Mechanical/ Piping/ Machinery” construction works

161,392.00

153,322.40

All “Instrumentation & Controls” construction works

224,908.00

213,662.60

All “Electrical” construction works

135,940.00

129,143.00

All “Civil/Structural/Architectural” construction works

376,004.00

357,203.80

56,227.00

53,415.65

112,801.00

107,160.95

-

-

6.2

6.3

6.4

6.5 All “Loss Prevention” construction works

6.6

Demolition Work

6.7

Any Other Item

7

JALEHA -

7.1 All “Mechanical/ Piping/ Machinery” construction works

208,217.00

197,806.15

All “Instrumentation & Controls” construction works

290,160.00

275,652.00

All “Electrical” construction works

175,380.00

166,611.00

All “Civil/Structural/Architectural” construction works

485,092.00

460,837.40

72,540.00

68,913.00

145,528.00

138,251.60

-

-

7.2

7.3

7.4

7.5 All “Loss Prevention” construction works

7.6

Demolition Work

7.7

Any Other Item

Total Construction

8,446,830.00

8,024,488.50

Page 168 of 170 3 of 14

CONTRACT NO: GC16110300 EPIC FOR EXTENSION OF MANIFOLDS TO CREATE ADDITIONAL SLOTS AT KN AND KS IN DUKHAN  Pre-Commissioning, Commissioning & Operational Testing Item

DESCRIPTION

LUMP SUM  AMOUNT  (QAR)

95% OF LUMP SUM  AMOUNT (QAR)

Cummulative till last Invoice % progress

2.2.1.1 App B Part 1 clause 2.2.1.1  Ninety five percent 95% of the LUMP PRICE portion is based on physical progress for the month Schedule 05: Pre‐Commissioning, Commissioning & Operational  Testing 1 KHATIYAH NORTH 1.1 All pre-commissioning activities of the FACILITY, including 15,682.00                     14,897.90  preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 1.2 All commissioning activities of the FACILITY including 25,354.00                     24,086.30  preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 1.3 All Operations and performance tests including Site 89,537.00                     85,060.15  Acceptance Tests (SAT) requirements. 1.4 Project Dossier: compilation by sub-system as required in 15,139.00                     14,382.05  Scope of Work Clause 4.10, Appendix A 1.5 Any Other Item 18,388.00                     17,468.60                                     ‐    2 KHATIYAH MAIN 2.1 All pre-commissioning activities of the FACILITY, including 15,682.00                     14,897.90  preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 2.2 All commissioning activities of the FACILITY including 25,354.00                     24,086.30  preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 2.3 All Operations and performance tests including Site 89,537.00                     85,060.15  Acceptance Tests (SAT) requirements. 2.4 Project Dossier: compilation by sub-system as required in 15,139.00                     14,382.05  Scope of Work Clause 4.10, Appendix A 2.5 Any Other Item 18,388.00                     17,468.60                                     ‐    3 KHATIYAH SOUTH 3.1 All pre-commissioning activities of the FACILITY, including 15,682.00                     14,897.90  preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 3.2 All commissioning activities of the FACILITY including 25,354.00                     24,086.30  preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 3.3 All Operations and performance tests including Site 89,537.00                     85,060.15  Acceptance Tests (SAT) requirements. 3.4 Project Dossier: compilation by sub-system as required in 15,139.00                     14,382.05  Scope of Work Clause 4.10, Appendix A 1.5 Any Other Item 18,388.00                     17,468.60                                     ‐    4 FAHAHIL NORTH 4.1 All pre-commissioning activities of the FACILITY, including 15,682.00                     14,897.90  preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 4.2 All commissioning activities of the FACILITY including 25,354.00                     24,086.30  preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 4.3 All Operations and performance tests including Site 89,537.00                     85,060.15  Acceptance Tests (SAT) requirements. 4.4 Project Dossier: compilation by sub-system as required in 15,139.00                     14,382.05  Scope of Work Clause 4.10, Appendix A 4.5 Any Other Item 18,388.00                     17,468.60                                     ‐    5 FAHAHIL MAIN                                    ‐    5.1 All pre-commissioning activities of the FACILITY, including 15,682.00                     14,897.90  preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts

Amount QR.

This Invoice % progress

Amount QR.

Cummulative upto this invoice % progress

Amount QR.

Page 169 of 170 1 of 14

Item DESCRIPTION 5.2 All commissioning activities of the FACILITY including preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 5.3 All Operations and performance tests including Site Acceptance Tests (SAT) requirements. 5.4 Project Dossier: compilation by sub-system as required in Scope of Work Clause 4.10, Appendix A 5.5 Any Other Item 6 FAHAHIL SOUTH 6.1 All pre-commissioning activities of the FACILITY, including preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 6.2 All commissioning activities of the FACILITY including preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 6.3 All Operations and performance tests including Site Acceptance Tests (SAT) requirements. 6.4 Project Dossier: compilation by sub-system as required in Scope of Work Clause 4.10, Appendix A 6.5 Any Other Item 7 JALEHA 7.1 All pre-commissioning activities of the FACILITY, including preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 7.2 All commissioning activities of the FACILITY including preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 7.3 All Operations and performance tests including Site Acceptance Tests (SAT) requirements. 7.4 Project Dossier: compilation by sub-system as required in Scope of Work Clause 4.10, Appendix A 7.5 Any Other Item Total  Pre‐Commissioning, Commissioning & Operational Testing

95%

Cummulative till last Invoice

This Invoice

Cummulative upto this invoice

25,354.00                     24,086.30 

89,537.00                     85,060.15  15,139.00                     14,382.05  18,388.00                     17,468.60                                     ‐   

15,682.00                     14,897.90 

25,354.00                     24,086.30 

89,537.00                     85,060.15  15,139.00                     14,382.05  18,388.00                     17,468.60                                     ‐   

15,682.00                     14,897.90 

25,354.00                     24,086.30 

89,537.00                     85,060.15  15,139.00                     14,382.05  18,388.00                     17,468.60               1,148,700.00

             1,091,265.00

Page 170 of 170 2 of 14

Related Documents


More Documents from "Sayad ali"