COMMENTS RESOLUTION SHEET [ CRS ] CONTRACT NUMBER: CONTRACT TITLE:
GC16101100
No.
1.
2.
3.
4.
5.
3963
EPIC FOR REPLACEMENT OF OLD 3‐PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN
QP EXTERNAL TRANSMITTAL REFERENCE : DOCUMENT NUMBER: DOCUMENT TITLE:
QP PROJECT NUMBER
EDD/GC16101100/EXT/TN/3945
3963‐DGEN‐0‐04‐0001 Project Planning Package
QP COMMENTS General comment related with P6 integrity: 1. 27 activities out of sequence 2. 5 activities, actual date > data dates 3. 21 activities have invalid relationships 4. 1 activity with schedule loop 5. And the others, please see your schedule log created from P6. Att 1.1, overall s curve. S curve still showing timeline till Feb 2019, please revise. PP item 10, page 7 of 12 detailed Tie-in schedule shall be submit at least 4 months before SD
DATE:
13‐11‐2018
DOCUMENT REVISION:
D
CONTRACTOR RESPONSE 1. Noted & Incorporated
2. Noted & Incorporated 3. CPECC submit detailed Tie-in Schedule for JALM along Rev-D Planning Package & for FAHM, FAHN & FAHS in last week ofDec-18. See Attachment 3
Construction planned to be completed in July 2019, but the manpower histogram assign manpower until May 2019. Please clarify?
4. Until May-18 only construction activities including Commissioning are planned & As Built and Final Dossier are planned from 23-May-19 to 22-July19.
Page 3 of 12, item 1.0 1. Qatar diplomatic crisis is not a valid reason for the delay, since SD for Khatiyah sector has been completed and the rest can be planned accordingly. This issue shall be removed from Planning package. 2. Weather condition shall be removed from planning package. High humidity during summer is annual event in Qatar, Contractor shall plan accordingly for this matter. This issue shall be removed from planning package. 3. Clashes with underground facilities. It's contractor scope to do UG Survey as per App A, 4.2.1.1.1 of the contract. The statement that said this is beyond CPECC shall be removed from Planning package.
5. Noted & Incorporated.
6.
Put triangle with rev. no/letter on the content that has been change from the previous revision
6. Noted & Incorporated
7.
Precomm and comm weightage has been change from the previous rev (indvidual and phase). Please clarify?
7. Progress & weightage for Pre commissioning and commissioning retained same as per actual on 25-10-18
In the previous revision, Precomm and commissioning has actual progress from the documents (Preparation of plan and procedures for recommissioning). Why the weightage for those documents has been removed in the rev.C. Please clarify? Activity ID A3100-5, Jaleha shutdown windows is 2 to 23 March 2019. CPECC planned to have it in the last week (18 to 23 March 2019)? Please clarify? If any unexpecting event occur, we don't have any buffer time. Piping Fabrication for Jaleha and Fahahil seem not as main priority? Jaleha and Fahahil, especially piping for Shutdown tie in shall be assign as main priority to avoid delay during SD time.
8. Refer Sr. No. 7 response
8.
9.
10.
Submit native CRS along with the revised document/drawing.
9. Refer Sr. No. 3 response
. 10. Currently Piping fabrication for Jaleha & Fahahil degassing station in
progress at Medgulf & Dopet facility in Qatar for CS pipes & FBE coated pipes at Kuwait. CPECC continuing expediting the fabrication progress for Jaleha & Fahahil in order to deliver the material at site before Shutdown avoid the delay during SD time ongoing .
PROJECT / CONTRACT REF.: 3963 / GC16101100 CONTRACT TITLE: -
EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN
Project Planning Package
China Petroleum Engineering & Construction Corporation Ding Guiping Ding Guiping
th
D
RE-ISSUED FOR CONSTRUCTION
Vivek / Taimoor
Zafar/WDH
th
C
RE-ISSUED FOR CONSTRUCTION
Vivek / Taimoor
Zafar/WDH
th
B
RE-ISSUED FOR CONSTRUCTION
Vivek
Zafar/WDH
Wang Xilin
th
26 Mar 2018
A
APPROVED FOR CONSTRUCTION
Vivek
Zafar/WDH
Wang Xilin
10th Aug
2
RE-ISSUED FOR APPROVAL
Vivek
Zafar/WDH
Wang Xilin
1
ISSUED FOR APPROVAL
Vivek
Wang Danghui
Wang Xilin
16 Mar
0
ISSUED FOR COMMENTS
Li Xiuwang
Zafar
Wang Xilin
DATE
REV. NO
REASON FOR REVISION
PREPARED
CHECKED
APPD.
DOCUMENT NUMBER:
3963-DGEN-0-04-0001
4 DEC 2018 4 Nov 2018 29 July 2018
th
7 May th
SHT.
001
OF
008
APPD. QP
REV. D
Page 1 of 170
PROJECT PLANNING PACKAGE
TABLE OF CONTENT 1.0 INTRODUCTION: ......................................................................................................................................................3 2.0 INTEGRATED PLANNING NETWORK ........................................................................................................................3 2.1 WEIGHTAGE SYSTEM & S-CURVES: .........................................................................................................................4 3.0 MANPOWER DEPLOYMENT: ....................................................................................................................................4 4.0 PROGRESS MEASUREMENT SYSTEM .......................................................................................................................4 4.1 DETAILED ENGINEERING: ........................................................................................................................................4 4.2 PROCUREMENT: ......................................................................................................................................................5 5.0 EGINEERING DESIGN DRAWING REGISTER (EDDR): ................................................................................................5 6.0 PROCUREMENT REGISTER & PROJECT DOCUMENT REGISTER: ..............................................................................6 7.0 CONSTRUCTION CONTROL REGISTER: .....................................................................................................................6 8.0 EQUIPMENT DEPLOYMENT PLAN: ...........................................................................................................................6 9.0 PROGRESS REPORTING (Monthly, Weekly & Daily): ...............................................................................................6 10.0 Shown Tie-in break down: .....................................................................................................................................7 11.0 Project Execution:..................................................................................................................................................7 11.1 Execution Policy .....................................................................................................................................................7 11.2 Engineering Execution Plan: ..................................................................................................................................7 11.3 Procurement:.........................................................................................................................................................8 11.4 Construction & Commissioning Management: .....................................................................................................9 11.5 Construction Works Execution: .............................................................................................................................9 11.6 Civil works:.......................................................................................................................................................... 10 11.7 Piping Works:...................................................................................................................................................... 10 11.8 Electrical & Instrumentation: ............................................................................................................................. 10 11.9 Pre-commissioning and Commissioning: ........................................................................................................... 10 11.10 Quality Plan: ..................................................................................................................................................... 11 12.0 ATTACHMENTS: .................................................................................................................................................. 11
2|Page Page 2 of 170
PROJECT PLANNING PACKAGE
1.0 INTRODUCTION: CPECC hereby is submitting revised project schedule, incorporating QP letter QP/PND/GC16101100/CP/F/034 for the revised commencement date of the demolishing for Existing Test Separator in FAHM and shutdown tie-in window and FAHM, FAHS, FAHN and JAHM.
Commissioning Completion dates for the stations are as follow: KAHS : 26th Jan 2019.
KAHM – 27th Jan 2019.
KAHN: 29th Jan 2019.
JALM – 6th April 2019
FAHN – 9th May 2019
FAHS – 20th May 2019
FAHM – 22th May 2019
Rev-D
Milestone completion dates are as follow:
MS1 – 22th May 2019
MS-2 (Handover final dossier) – 22 July 2019
Apart from the impact on the Project Schedule due to shutdown tie-ins dates and commencement date for FAHM demolishing of existing test separator, following events have also impacted the Project schedule, which are beyond CPECC’s control: • Less Quantity of Piping Bulk Items - Due to less quantity of piping material, we were constrained to choose stockiest in UAE to supply material with 3.1 certification plus test and re-routed from UAE to Qatar from different countries. • Authority prolong approval for various lifting documents and certificates and personals • Delay due to ambiguities/discrepancies/conflicting information in FEED documents. • Substantially increased in FEED quantities in the range of 40% to 200% for steel structural, piping, valves, electrical cable, and instrumentation cable. • Reschedule of Khatiyah stations shutdown from Oct-Nov 2018 to Jan-Feb 2018 In view of above, CPECC further requests QP to approve the revised Project schedule. CPECC hereby commencing weekly and monthly report. 2.0 INTEGRATED PLANNING NETWORK Planning & scheduling is developed using Primavera Project Planner Version 6 R8.2 3|Page Page 3 of 170
PROJECT PLANNING PACKAGE
Manpower estimated for completion of each construction based on productivity, which in detailed define in productivity sheet, attachment-11, which define to manpower require for the scope of work. Progress for Engineering is based on man-hours required to produce Engineering deliverables detailed in register. Procurement is based on cost of the item of procurement detailed in the procurement register. The schedule proposed to be updated weekly and utilized for calculation of earned values for S-Curves . Detailed schedule with planned early start, early finish and original duration is enclosed under Attachment-1. 2.1 WEIGHTAGE SYSTEM & S-CURVES:
Cost based Lev-1 weightage, which define as below, further to fulfill the requirement of appendix D for minimum % weightage of Pre-Commissioning & Handover Dossier, CPECC proposed Lev-1 weightage as below for QP approval.
LEV-1 COST ADJUSTMENT to accommodate 10% Commissionning Contract Price
10% for comm
adjust amount
Revised price
Cost %
Preliminaries General Matters
for monitorting
Engineering
1,602,400.00
112,168.00
1,490,232.00
3.98%
Procurement
26,216,183.00
1,835,132.81
24,326,918.00
65.02%
Const & Inst
8,446,834.00
591,278.38
7,855,555.62
21.00%
Pre-Comm & Comm
1,148,701.00
3,741,411.80
2,592,710.80
3,741,411.80
10.00%
37,414,118.00
3,741,411.80
37,414,117.42
100.00%
Final Handover Dossier
The Lev-2 Progress table, weightage factors, Cost distribution details and S-Curves are enclosed under attachment-2.
3.0 MANPOWER DEPLOYMENT: Manpower deployment is developed based on estimated manpower required for completion of all EPC phases. Detailed matrix of trade wise manpower estimated is enclosed under attachment 5.0. 4.0 PROGRESS MEASUREMENT SYSTEM 4.1 DETAILED ENGINEERING:
Cumulative scales of progress should be compiled using controllable steps of physical work achievements for each generic type of document. Actual progress shall be calculated from the document status register. 4|Page Page 4 of 170
PROJECT PLANNING PACKAGE
Start on Drawing Board in a logical sequence 5% Issue for QP review, (IFC) 40% Issued for QP approval, (IFA) 65% Issued as Approved for Construction, ( AFC with hold ) - 85% Issued Approved for Construction (AFC without hold) - 95% Issue As built 100%
4.2 PROCUREMENT:
For procurement, cumulative scales of progress shall be established to monitor each item from the inquiry stage up to the delivery and acceptance at Site. Actual progress shall be calculated from the procurement status register. Two different scales shall apply for Equipment and bulk supply. The progress scale for each package shall be:
Issue MR for QP approval 5% Issue RFQ to Vendors 10% Issue Purchase Order 15% Vendor Drawing Approval 30% Receipt of filled SPIR 40% Inspection cleared and factory tested - 60% Ex-Works Delivery and FOB Complete - 70% Material received and inspected at Construction site - 85% QP inspected and cleared material at site - 90% All spare parts rec’d and SPIR completed -100%
Bulk Material for Progress tracking only (If deemed necessary by QP) The progress scale for each Purchase Order or Sub-contract shall be:
Issue RFQ to Vendors 5% Place order for Bulk material – 15% Material Delivery Ex-works (50% of estimated quantity) - 30% Material Delivery Ex-works (90% of estimated quantity) - 40% Material received at Const. Site(50% of estimated qty) - 50% 90% Material received at Construction Site - 80% All Material received and purchase order closed - 100%
5.0 EGINEERING DESIGN DRAWING REGISTER (EDDR):
Project document register developed based on execution schedule, scope of work in consultation with Engineering team and Discipline Engineers. Project Document Registers are enclosed under attachment 6.0 5|Page Page 5 of 170
PROJECT PLANNING PACKAGE
6.0 PROCUREMENT REGISTER & PROJECT DOCUMENT REGISTER:
Procurement register developed based on Execution schedule, scope of work in consultation with Engineering and Discipline Project Engineers. Procurement enclosed under attachment 7.0. 7.0 CONSTRUCTION CONTROL REGISTER:
Construction Control Register is developed based on Execution schedule, scope of work based on quantity and productivity. Construction register format enclosed under attachment 8.0. 8.0 EQUIPMENT DEPLOYMENT PLAN:
Equipment deployment plan is prepared in consultation with the project execution team. The plan is issued at the start of the project according to the equipment identified in the bid/budget of the job. Equipment deployment plan is enclosed under attachment 9.0 9.0 PROGRESS REPORTING (Monthly, Weekly & Daily):
A weekly progress report with Thursday of the week as cut off shall be submitted to QP on every Sunday early. (Weekly progress reporting formats are enclosed under attachment 10.0 The Monthly Progress Report (MPR) shall be submitted under a cover of transmittal sheet, during the entire duration of the CONTRACT, with last Thursday in a calendar month as cut-of. The report shall be submitted to QP on Sunday and is treated as monthly cut-off, unless otherwise agreed. Monthly Progress Reporting formats are enclosed under attachment 11.0 During Construction Phase Daily Report shall be submitted each morning a daily progress from the previous day, This includes Split trade manpower, machinery deployment (including subcontractor) material received at site, achieved quantities for the major activities. Detailed format and content for the report is finalized in consultation with QP REPRESENTATIVE. Critical Path: Total float less than or equal to 5 days considered as critical activities in revised schedule. There are two critical paths in the current schedule. 1. Driven from procurement, installation pre-commissioning and commissioning of Deluge Skid.
6|Page Page 6 of 170
PROJECT PLANNING PACKAGE
2. Driven from release for demolition of Existing Test Separator in Fahahil Main, construction for new foundation, installation of New Test Separator associate pipping, instrumentation, pre-commissioning and commissioning. 10.0 Shown Tie-in break down:
CPECC will submit detailed Tie-in schedule during shutdown works 4 month before the start for shutdown. 11.0 Project Execution: 11.1 Execution Policy
To ensure the success of the Project, CPECC shall made the following commitment in undertaking the Engineering, Procurement, Construction and Commissioning of the Facility: CPECC will carry out the Works in accordance with the requirement given in the CONTRACT. Higher priority will be given to HSE issues throughout every phase of the Project. CPECC will strictly enforce our Corporate Safety Policy which is “Zero-Accident” and to promote the highest standard of safety in the industry. Throughout the execution of the Project, CPECC will maintain the Quality Standard embodied within the Project requirements for world-class facility. CPECC will draw maximum synergies from the utilization of our technical and operational specialties, while optimizing proficiency from standardization of activities. Majority of the scope of WORK for engineering, procurement, construction and commissioning are planned to self-perform by CPECC. Minor works like Site investigation & survey, TPI, temporary facilities works, etc. will be subcontracted to others. Early Tie-in works for Khatiya Stations are critically planned & executed for early engineering, procurement at early phase of the project.
11.2 Engineering Execution Plan:
Design and detail engineering activities will be carried out at our Engineering Office in Dubai. The full engineering scope shall maximized the synergies arising from the best utilization of available technical excellence and qualified resources our engineering organization. The Dubai Office will be responsible for the overall project areas as follows: Detailed Engineering Procurement Management 7|Page Page 7 of 170
PROJECT PLANNING PACKAGE
Expediting Material Third Party Studies and Design Review.
First main step will be definition of the Technical Design Basis and Early Tie-in package, which cover early tie-in philosophy, data sheets and specification for early tie-in materials, in liaison with the COMPANY and follow by the preparation of general technical specifications, procedures and documentation, common throughout the whole project. These preliminary activities will be executed from Dubai office, where COMPANY’s reviews will take place through online ASSAI system The project engineering office in Dubai coordinates further to Qatar Site Office, according to well established Corporate Procedures and Work Practices. Proper coordination and contribution from Qatar Site will be ensured through the incharge Field Construction team and/or specific assignments of concerned Specialists Sub Contractor (e.g. Site Investigation Sub Contractor). As Company instruction, detailed engineering will prepare early tie-in package, which allows for early procurement of valves pipes and fittings to accommodate Khatiya Shutdown plans in Jan and Feb 2018. 11.3 Procurement:
Procurement activities for early tie-in materials are planned at early phase of project follow by project remaining materials. Project Procurement will be managed as to ensure that the following main objectives are reached: Procurement of fit for purpose materials from project approved Vendors only, and in compliance with the project’s technical, quality and safety requirements; Procurement in compliance with project schedule requirements, with timely delivery of information from vendors to engineering and materials to Construction; Procurement against the budget and Contract requirements. Relevant main drivers will be: Overall coordination of procurement activities to ensure consistency and homogeneous implementation of common principles and procedures throughout the whole project, under the responsibility of Project Management Team, from Qatar Home Office, as well as support Qatar Site office for local procurement, whenever needed; Tried and tested execution systems; Maximization of materials standardization, and early spare parts definition and purchasing, in coordination with COMPANY; Special care will be devoted to procurement of long lead items on schedule and out of the critical path. In this respect, CPECC will Early issue of purchased orders (as practical as possible), based on material requisitions developed during the bidding phase; Implement close expediting and control of vendor data Operate a high level of surveillance at vendors’ workshops to monitor the progress of manufacturing; With regard to critical items. CPECC intends at maximum possible extent to manage their purchased Order by placing blanket purchased orders based initially on preliminary MTO and the piping classes’ specifications developed by CPECC from those available in ITT documentations.
8|Page Page 8 of 170
PROJECT PLANNING PACKAGE
Details on Procurement organization, vendor’s qualification, expediting and inspection procedures and traffic & logistics plans as well as on material management systems are further given within the Procurement Plan and associated procedures. 11.4 Construction & Commissioning Management:
The Project Manager is mobilized to Qatar Site to take the overall management of the project from the Site. A team of appointed staffs mainly the Construction Manager and construction supervisory staffs from CPECC corporate resources will carry out Site Construction Management. At Dubai Office, construction will be carried-out during planning stage. The early involvement of Construction as well as Commissioning personnel is to familiarize with the project and assist in the development of the project plans and to provide input and direction to the overall project team. The organization Site Management Head will define the requirements for the Project, will monitor the implementation of the same and will interface the COMPANY. This team will coordinate the Construction Supervision Organization of CPECC that will be tailored for the follow-up of Works on field according to discipline and physical areas. Activities of the construction management team will start early after effective date, integrating with Dubai Office and Qatar Site Office, as needed to fully and smoothly prepare and plan in advance all construction activities and the issue and delivery to site of all needed deliverables, documents and materials, within the planned schedule. 11.5 Construction Works Execution:
This will be carried out through a majority of self-performance by CPECC, a balanced mix of subcontracts (mainly civil works), as to maximize works execution efficiency and quality under the supervision of CPECC’s Site Management Team. This joint team will coordinate the Field supervision groups in charge for the different Site Areas. A single system of Site procedures and method statements will be followed in the execution of works across the whole site and close liaison with the Engineering Organization will be maintained in order to ensure the most effective transfer of information from engineering to construction. Fabrication and laydown area is planned in Dukhan field, however to ensure early tie-in timely completion. Local sub-contractor for fabrication and painting of early tie-in works also under evaluation. The revised plan schedule mechanical, instrumentation works are driven by material deliveries, fabrication and delivery to site. However, civil works are carried out independently.
9|Page Page 9 of 170
PROJECT PLANNING PACKAGE
Calendar : • • •
For construction and pre-commissioning is consider 6days/ week. For commissioning is consider 7 days/ week Eid holidays consider only one day off, remaining days continue will be working.
11.6 Civil works:
Equipment foundations are most ready in all station stations except Fahahil Main. Pipe support foundations are in progress at Fahahil and Jaleha stations. Due to clashes with existing foundation. CPECC Civil Engineer spent two weeks at site in the month of July to resolve the site clashed. Revised pipe support drawings are AFC by End Aug, hence the pipe support is planned accordingly. However, as lesson learn from excavation low productivity. CPECC adding more manpower for the excavation of pipe supports, & remaining civil works. Steel Structure Fabrication is in progress with sub-contractor in Doha and closely monitored to achieve the deliveries for smooth execution of erection and installation activity. 11.7 Piping Works:
Piping fabrication also planned in two shifts, in order to mitigate the late delivery of materials. For Non FBE coated pipes. The pipes will be fabricated in Qatar in Med gulf & Dopet fabrication facility, which are performing as Sub-Contractor for CPECC for Piping fabrication work. For FBE coated pipes. The pipes will be fabricated in Kuwait with the same fabricator, who will do the FBE coating. 11.8 Electrical & Instrumentation:
CPECC has awarded subcontract for E&I works to IMCO for 3 Khatiyah degassing station & remaining 4 station shall be executed by CPECC E&I team as per the revised schedule. 11.9 Pre-commissioning and Commissioning:
A team from CPECC will organize and supervise the activity that will be physically carried out by manpower from CPECC with vendor site support. CPECC will lead the management side (system breakdowns, turnover procedures and the like) CPECC will arrange Vendors’ assistance as required, supported by timely planning of activities to ensure coping with project completion schedule. Preparatory activities relevant to Pre-commissioning and Commissioning management will start timely after effective date in the Home Office, in order to define and plan in 10 | P a g e Page 10 of 170
PROJECT PLANNING PACKAGE
advance all systems and units commissioning activities in coordination with and driving the construction plans, as well as instructing specific commissioning requirements to the Engineering specialists. 11.10 Quality Plan:
CPECC’s management system utilizes certified ISO 9001:2000 Quality Systems as a basis, supported by project specific plans and procedures to ensure that systemic auditable controls are in place and expectations are being met. WPS and PQR will be developed at early phase of project to facilitate early tie-in fabrication works. CPECC will develop a comprehensive Quality Plan in order to ensure that all HSE, Quality and Technical Integrity issues relating to the satisfactory execution of the works in full compliance with all applicable codes, standards, specifications and COMPANY expectations are identified and satisfactorily managed. This Quality Plan will also address in a systematic manner the major actions required to satisfactorily complete all Project phases, detailing process and procedures to be followed by the Engineering, Procurement, Construction and Commissioning Resources to achieve the COMPANY HSE, Quality and Technical Integrity Expectations. A Quality Assurance/ Quality Control Manager is appointed on the Project with the responsibility to maintain a high-level overview and audit function to ensure that measures are taken to grant compliance with the Assurance Plan at all levels of CPECC’s organization. 12.0 ATTACHMENTS: Attachment -1 Updated Revised Baseline Schedule Attachment -2 Critical path Attachment -3 Jaleha Shutdown Schedule Attachment – 4 Progress table, weightage factors lev-2
Attachment – 5 S-Curves
Attachment - 6 Manpower Histogram
Attachment - 7 EDDR
Attachment - 8 Procurement Register 11 | P a g e Page 11 of 170
PROJECT PLANNING PACKAGE
Attachment - 9 Construction Control Register
Attachment - 10 Construction Equipment Deployment Register
Attachment - 11 Weekly Report format
Attachment - 12 Monthly Report Format
Attachment - 13 Productivity Calculation Attachment - 14 Invoice Format
12 | P a g e Page 12 of 170
PROJECT PLANNING PACKAGE
Attachment 1
UPDATED REVISED BASELINE SCHEDULE
Page 13 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
Rev-D by TA E EPIC for Replacement of Old 3-Phase Test Separators at A Milestone
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
07-Feb-17
18-Feb-19
785
07-Feb-17
18-Feb-19
785
A1000
CONTRACT AWARD
07-Feb-17
DE1000
EFFECTIVE DATE
19-Feb-17
DE3380
ALL WORKS COMPLETE - MS1
DE1010
ACHIEVED - SCHEDULE COMPLETE 01-Apr-17
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
290
06-Feb-17 A
22-Jul-19
0
22-Jul-19
0
22-May-19*
0
276
06-Feb-17 A
0
100%
0
06-Feb-17 A
0
100%
0
19-Feb-17 A
0
0%
0
18-Feb-19
0
0%
0
20-Sep-17
124
18-Dec-18
Detailed Engineering Enginee
Phy. % Com.
Page 1 of32
0
20-Apr-17 A
22-Jul-19*
0
31-Dec-18
145
DE3320
ISSUE SHUTDOWN VALVE MTO/ DATASHEETS/ SPECIFICATION
01-Apr-17
0
100%
0
20-Apr-17 A
DE3330
ISSUE SHUTDOWN PIPING AND BULK MTO
27-Apr-17
0
100%
0
08-May-17 A
DE3260
ISSUE DESIGN BASE MEMORANDUM
08-May-17
0
100%
0
29-Jun-17 A
DE3270
ISSUE MR FOR TEST SEPARATORS
13-May-17
0
100%
0
28-May-17 A
DE3280
ISSUE MR FOR METERING
13-May-17
0
100%
0
12-Jul-17 A
DE3310
ISSUE SHUTDOWN PHILOSOPHY
15-May-17
0
100%
0
13-Jul-17 A
DE1020
HAZOP STUDY WORKSHOP
24-May-17
0
100%
0
08-Nov-17 A
DE3300
MR FOR DCS MODIFICATION
28-Jun-17
0
100%
0
10-Aug-17 A
DE3290
ISSUE MR FOR DELUGE
19-Jul-17
0
100%
0
25-Jul-17 A
DE1030
EQUIPMENT FOUNDATIONS AFC
03-Sep-17
0
100%
0
28-Jun-18 A
DE1040
DETAILED ENGINEERING COMPLETE
20-Sep-17
0
0%
0
31-Dec-18
145
31-Jan-19
119
14-Jul-18
452
DE3340
PO ISSUE SHUTDOWN VALVE FOR THREE STATIONS
08-May-17
08-May-17
0
100%
0
DE3350
PO ISSUE SHUTDOWN PIPING/ FITTING & BULK FOR THREE STATIONS
28-May-17
0
100%
0
17-Jul-17 A
DE3200
PO ISSUE FOR TEST SEPARATOR
19-Jul-17
0
100%
0
10-Sep-17 A
DE3370
DELIVERY OF PIPING AND FITTINGS FOR KS SHUTDOWN
16-Aug-17
0
100%
0
02-Nov-17 A
DE3240
PO FOR DCS MODIFICATION
05-Sep-17
0
100%
0
28-Dec-17 A
DE3220
PO ISSUE OF DELUGE SKID
27-Sep-17
0
100%
0
22-Feb-18 A
DE3360
DELIVERY OF VALVES KS FOR SHUTDOWN
30-Sep-17
0
100%
0
31-Oct-17 A
DE3250
DELIVERY OF DCS MODIFICATION SITE-EARLY TIE-IN
03-May-18
0
100%
0
20-Jan-18 A
DE3210
DELIVERY OF TEST SEPARATOR AT SITE (Last Batch)
14-Jul-18
0
100%
0
25-Aug-18 A
DE7260
DELIVERY OF DCS MODIFICATION WORK
0
0%
0
13-Dec-18
11
DE7280
DELIVERY OF DELUGE SKID SITE - 1st batch
0
0%
0
31-Dec-18
55
DE7290
DELIVERY OF FBE COATED PIPE AT SITE FROM KUWAIT
0
0%
0
01-Jan-19
36
DE7300
DELIVERY OF GGC VALVE
0
100%
0
11-Jul-18 A
DE7310
DELIVERY OF BALL VALVES
0
100%
0
13-Sep-18 A
DE7320
DELIVERY OF CONTROL VALVES
0
100%
0
28-Aug-18 A
DE7330
DELIVERY OF FLOW METERS
0
0%
0
10-Dec-18
DE7340
DELIVERY OF BS&W
0
100%
0
27-Sep-18 A
DE7350
DELIVERY OF INSTRUMENT CALBES
0
0%
0
22-Nov-18
22
DE7360
DELIVERY OF LEVEL GUAGE GLASS TYPE
0
0%
0
10-Dec-18
22
DE7370
DELIVERY OF MAGNETIC TYPES GUAGES
0
0%
0
10-Dec-18
15
DE7380
DELIVERY OF GUAGES PG / TG
0
0%
0
10-Dec-18
14
DE7390
DELIVERY OF 1ST BATCH OF PIPING
0
100%
0
30-Jul-18 A
DE7400
DELIVERY OF LAST BATCH OF PIPING
0
100%
0
27-Sep-18 A
DE7410
DELIVERY OF SDV/BDV
0
0%
0
20-Dec-18
11
DE7420
DDELIVERY OF DELUGE SKID 2ND BATCH
0
0%
0
31-Jan-19
9
22-May-19
0
Procurement
03-Oct-17
Construction
08-Dec-18
75
368
11-May-17 A
169
10-Dec-17 A
KAHM START WORKS
03-Oct-17
0
100%
0
10-Dec-17 A
A1060
KAHN START WORKS
29-Nov-17
0
100%
0
16-Dec-17 A
A1070
KAHS START WORKS
10-Jan-18
0
100%
0
25-Dec-17 A
A1080
JALM START WORKS
20-Feb-18
0
100%
0
05-Jun-18 A
Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone
3963-Rev-D.-1
Page 1 of 32
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
M 2
A 3
M 4
2017 J Jul A 5 6 7
S 8
17:45
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
11-May-17 A
A1050
Primary Baseline
F 1
29-Nov-18
19
Date 29-Nov-18 06-Nov-18
U-3963_REV-D Revision Rev-D Revised schedule Rev-C Revised schedule
Checked
Approved
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan U3963- Updated Revised Baseline Schedule.
Page 14 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
08-Apr-18 A
A1090
FAHS START WORKS
28-Apr-18
0
100%
0
A1190
FAHM START WORKS - ISOLATION OF EXISTING SEPARATOR
09-May-18
0
0%
0
07-Nov-18
A1180
FAHN START WORKS
19-Jun-18
0
100%
0
05-May-18 A
A1020
START OF 1ST INSTALLATION OF TEST SEPARATOR
15-Jul-18
0
100%
0
09-Aug-18 A
38 0
100%
0 0
07-Jan-18 A 07-Jan-18 A
06-Dec-17
0
100%
0
23-Dec-17
39 0
100%
0 0
23-Dec-17
0
100%
0
23-Dec-17
38 0
100%
0 0
23-Dec-17
0
100%
0
08-Oct-18 08-Oct-18
0 0
0%
12 0
0
Shutdown Tie-in for Khatiyah North A1100 SHUTDOWN START A1170
SHUTDOWN COMPLETE
Shutdown Tie-in for Khatiyah Main A1110 SHUTDOWN START A1200
JALM Tie-ins A1220 A1330
08-Oct-18 FLARE HEADER HOT TAPPING COMPLETE 25-Oct-18
25-Oct-18 25-Oct-18
SHUTDOWN TIE-INS 29-Oct-18
SHUTDOWN TIE-INS
Fahahil Main Tie-ins Tie A1240 FLARE HEADER HOT TAPPING COMPLETE A1460
06-Dec-17
SHUTDOWN TIE-IN
Fahahil North Tie Tie-ins A1150 FLARE HEADER HOT TAPPING COMPLETE A1160
07-Nov-17 07-Nov-17
SHUTDOWN COMPLETE
Fahahil South Tie Tie-ins A1230 FLARE HEADER HOT TAPPING COMPLETE A1340
06-Nov-17 06-Nov-17
SHUTDOWN COMPLETE
Shutdown Tie-in for Khatiyah South A1120 SHUTDOWN START A1210
24-Oct-17 24-Oct-17
29-Nov-18
08-Oct-18
0
0%
0 0
0
0%
0
17-Nov-18 29-Oct-18
16 0
0%
0 0
17-Nov-18
0
0%
0
29-Nov-18 29-Nov-18
0 0
0%
15 0
0
0%
0
08-Dec-18 08-Oct-18
52 0
0%
100 0
SHUTDOWN TIE-INS
Commissioninng A1260 COMPLETE OF COMMISSIONING AT KHATIYAH MAIN
0%
0 0
Page 2 of32 Act. Fin / F-C Fin
TF
17-Feb-18 A 28-Feb-19
22-Apr-19
22-Apr-19
16-Mar-19 28-Feb-19
19 31
16-Mar-19
9
22-Apr-19 22-Apr-19
24 24
22-Apr-19
15
22-Apr-19 22-Apr-19
15 15
22-Apr-19
15
06-Apr-19
22-Apr-19 06-Apr-19
26 41
22-Apr-19
0
26-Jan-19
22-May-19 27-Jan-19*
0 0
29-Jan-19*
0
A1280
COMPLETE OF COMMISSIONING AT KHATIYAH SOUTH
10-Nov-18
0
0%
0
26-Jan-19*
0
A1290
COMPLETE OF COMMISSIONING AT JALM
17-Nov-18
0
0%
0
06-Apr-19*
0
A1300
COMPLETE OF COMMISSIONING AT FAHAHIL SOUTH
26-Nov-18
0
0%
0
20-May-19*
0
A1320
COMPLETE OF COMMISSIONING AT FAHAHIL MAIN
26-Nov-18
0
0%
0
22-May-19*
0
A1310
COMPLETE OF COMMISSIONING AT FAHAHIL NORTH
08-Dec-18
0
0%
0
09-May-19*
0
18-Feb-19
0
22-Jul-19
0
18-Feb-19
0
19-Feb-17
20-Sep-17
154
48
19-Feb-17
20-Sep-17
154
DESIGN BASIS MEMORANDUM
19-Feb-17 19-Feb-17
30-May-17 07-May-17
73 63
DE3390
PLANNING PACKAGE IFR
19-Feb-17
30-Apr-17
DE3400
FEED VALIDATION
19-Feb-17
14-Mar-17
DE3770
EDDR
13-Mar-17
DE6770
SITE VISIT REPORT
DE3780
ENGINEERING EXECUTION PLAN
DE7250
22-Jul-19
22-Jul-19
0
19-Feb-17 A
31-Dec-18
145
48
19-Feb-17 A
31-Dec-18
145
100%
0 0
19-Feb-17 A 15-Mar-17 A
14-Dec-17 A 07-Dec-17 A
57
100%
0
16-Mar-17 A
27-Sep-17 A
20
100%
0
19-Feb-17 A
14-Mar-17 A
29-May-17
63
100%
0
12-Mar-17 A
03-Aug-17 A
14-Mar-17
30-May-17
63
100%
0
15-Mar-17 A
14-Dec-17 A
14-Mar-17
30-May-17
63
100%
0
15-Mar-17 A
10-May-17 A
HAZOP/HAZID WORKSHOP
18-May-17
24-May-17
5
100%
0
05-Nov-17 A
08-Nov-17 A
PROCESS EQUIPMENT LIST (DGEN)
19-Feb-17 19-Feb-17
18-Sep-17 07-May-17
152 63
100%
48 0
02-Apr-17 A 11-May-17 A
31-Dec-18 18-Jan-18 A
DE3750
PROCESS UTILITY CONSUMPTION SUMMARY (DGEN)
20-Feb-17
08-May-17
62
100%
0
25-May-17 A
27-Sep-17 A
DE3440
PROCESS OTHER REPORTS (DGEN)
27-Feb-17
20-Jun-17
92
100%
0
22-Jun-17 A
22-Feb-18 A
DE3460
PROCESS SIMULATION & H&MB REPORT (DGEN)
02-Apr-17
15-Jun-17
62
100%
0
10-Apr-17 A
18-Jul-17 A
DE3420
PROCESS DESIGN CALCULATIONS (DGEN)
11-Apr-17
18-Sep-17
129
100%
0
02-Apr-17 A
12-Oct-17 A
DE3410
PROCESS LEGEND, SYMBOLS & DRAWING INDEX (DGEN)
17-Apr-17
03-Jul-17
62
100%
0
18-Apr-17 A
02-Oct-17 A
DE6780
PROCESS DESCRIPTION
03-May-17
19-Jul-17
62
100%
0
04-May-17 A
28-Sep-17 A
DE3470
PROCESS PHILOSOPHIES (DGEN)
18-May-17
11-Sep-17
92
100%
0
28-Jun-17 A
24-Sep-18 A
DE3450
PROCESS OPERATING MANUALS (DGEN)
25-Jul-17
14-Sep-17
42
70%
48
25-May-17 A
31-Dec-18
PIPING DATA SHEETS (DGEN)
02-Mar-17 02-Mar-17
20-Sep-17 24-Jul-17
144 116
100%
0 0
15-Mar-17 A 15-Mar-17 A
01-Feb-18 A 05-Oct-17 A
Detail Engineering General & Common Comm General DE3760
Process DE3430
Piping DE3620
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
17-Feb-18 A
0
0
S 8
14-Feb-18 A 06-Feb-18 A 06-Feb-18 A
0%
0%
2017 J Jul A 5 6 7
14-Feb-18 A
0
18-Feb-19
M 4
14-Feb-18 A 11-Jan-18 A 11-Jan-18 A
30-Oct-18
FINAL DOCUMENTATION / HANDOVER DOSSIER
A 3
14-Feb-18 A
COMPLETE OF COMMISSIONING AT KHATIYAH NORTH
A1250
M 2
17:45
44
A1270
Final documentation documenta & As Built / Handover
F 1
29-Nov-18
0
145
145
Page 15 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule.
Page 3 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
30-Nov-17 A
DE6860
PIPING EARLY TIE-IN PACKAGE (DGEN)
02-Mar-17
14-May-17
59
100%
0
15-Mar-17 A
DE6970
PIPING TBES FOR EARLY TIE-IN BALL VALVES (DGEN)
23-Mar-17
08-Jun-17
63
100%
0
15-Mar-17 A
25-Jul-17 A
DE3630
PIPING SPECIFICATIONS (DGEN)
29-Mar-17
29-Jun-17
75
100%
0
29-Mar-17 A
08-Oct-17 A
DE3640
PIPING MRS (DGEN)
21-May-17
21-Aug-17
75
100%
0
21-Mar-17 A
21-Dec-17 A
DE3650
PIPE SUPPORT DETAILS (DGEN)
20-Jul-17
11-Sep-17
43
100%
0
27-Jul-17 A
01-Feb-18 A
DE3660
PIPING TBES (DGEN)
26-Jul-17
20-Sep-17
45
100%
0
20-Jul-17 A
29-Jan-18 A
MECHANICAL SPECIFICATIONS (SEPARATOR)
15-Mar-17 15-Mar-17
12-Sep-17 20-Jun-17
130 79
100%
0 0
05-Apr-17 A 05-Apr-17 A
01-Oct-17 A 03-Aug-17 A
DE6990
MECHANICAL DATA SHEETS (SEPARATOR)
27-Mar-17
12-Jun-17
63
100%
0
27-Apr-17 A
03-Aug-17 A
DE3480
MECHANICAL MRS (SEPARATOR)
03-Apr-17
09-Jul-17
79
100%
0
11-May-17 A
31-Jul-17 A
DE3490
MECHANICAL TBES (DGEN)
24-Jul-17
12-Sep-17
42
100%
0
03-Aug-17 A
01-Oct-17 A
20-Jun-17 31-May-17
69 62
15-Mar-17 A 15-Mar-17 A
23-May-17 A 07-May-17 A
Mechanical DE7000
ELECTRICAL DATA SHEETS (DGEN)
16-Mar-17 16-Mar-17
100%
0 0
DE3520
ELECTRICAL SPECIFICATIONS (DGEN)
16-Mar-17
08-Jun-17
69
100%
0
15-Mar-17 A
23-May-17 A
DE3510
ELECTRICAL TYPICAL INSTALLATION DETAILS (DGEN)
29-Mar-17
20-Jun-17
68
100%
0
02-Apr-17 A
07-May-17 A
Civil DE3590
CIVIL SPECIFICATIONS (DGEN)
14-Mar-17 14-Mar-17
03-Sep-17 06-Jun-17
123 69
100%
0 0
14-Mar-17 A 14-Mar-17 A
02-May-18 A 18-May-17 A
DE3600
CIVIL GENERAL NOTES (DGEN)
14-Mar-17
30-May-17
63
100%
0
16-Mar-17 A
24-May-17 A
DE3790
CIVIL TYPICAL DETAILS (DGEN)
21-Mar-17
03-Sep-17
133
100%
0
14-Mar-17 A
28-Mar-18 A
DE3580
CIVIL DESIGN BASIS (DGEN)
13-Apr-17
02-Jul-17
63
100%
0
21-Mar-17 A
01-Jun-17 A
DE3570
CIVIL MTOS (DGEN)
25-May-17
10-Aug-17
62
100%
0
25-May-17 A
12-Oct-17 A
DE3560
CIVIL DEMOLITION DRAWINGS (DGEN)
30-May-17
15-Aug-17
62
100%
0
31-May-17 A
23-Nov-17 A
DE3610
CIVIL DESIGN CALCULATIONS (DGEN)
13-Jun-17
29-Aug-17
62
100%
0
08-Jul-17 A
02-May-18 A
FIRE & SAFETY STUDIES (DGEN)
23-Mar-17 23-Mar-17
20-Sep-17 08-Jun-17
129 63
100%
0 0
26-Mar-17 A 29-Mar-17 A
09-Sep-18 A 20-Jun-17 A
DE3680
HSE PLAN (DGEN)
30-Mar-17
15-Jun-17
62
100%
0
26-Mar-17 A
08-Jun-17 A
DE3670
HSE SPECIFICATIONS (DGEN)
09-Apr-17
05-Jul-17
71
100%
0
05-Apr-17 A
03-Jan-18 A
DE3700
HSE REPORTS (DGEN)
19-Apr-17
19-Sep-17
124
100%
0
05-Apr-17 A
20-Mar-18 A
DE7120
HSE CALCULATIONS (DGEN)
24-Apr-17
10-Jul-17
62
100%
0
05-Apr-17 A
23-Jan-18 A
DE3710
HSE REGISTER (DGEN)
04-May-17
20-Sep-17
111
100%
0
25-May-17 A
09-Sep-18 A
DE7110
HAZARDOUS AREA CLASSIFICATION PHILOSOPHY AND SCHEDULE (DGEN)
14-May-17
30-Jul-17
62
100%
0
03-Apr-17 A
18-Jul-17 A
DE3740
HSE STUDIES (DGEN)
20-Jun-17
05-Sep-17
62
100%
0
05-Apr-17 A
28-Jul-18 A
DE3690
HSE MRS (DGEN)
04-Jul-17
19-Sep-17
62
100%
0
04-Jul-17 A
09-Jan-18 A
DE3720
HSE TBES (DGEN)
07-Aug-17
14-Sep-17
32
100%
0
19-Oct-17 A
28-Mar-18 A
INSTRUMENTS SPECIFICATIONS (DGEN)
03-Apr-17 03-Apr-17
20-Sep-17 09-Jul-17
123 79
100%
0 0
14-Mar-17 A 14-Mar-17 A
26-May-18 A 14-Sep-17 A
DE3530
INSTRUMENTS MRS (DGEN)
29-May-17
14-Sep-17
89
100%
0
14-Mar-17 A
19-Oct-17 A
DE3540
INSTRUMENTS SCOPE OF WORK (DGEN)
06-Jun-17
22-Aug-17
63
100%
0
08-Jun-17 A
25-Sep-17 A
DE3550
INSTRUMENTSTBES (DGEN)
20-Jul-17
20-Sep-17
51
100%
0
15-Mar-17 A
26-May-18 A
DE3800
INSTRUMENTS DIAGRAMS (DGEN)
01-Aug-17
18-Sep-17
39
100%
0
01-Aug-17 A
13-Nov-17 A
DE3810
INSTALLATION DETAILS (DGEN)
15-Aug-17
20-Sep-17
30
100%
0
01-Aug-17 A
19-Oct-17 A
07-Mar-17
20-Sep-17
142
0
12-Mar-17 A
26-Aug-18 A
28-Aug-17 15-Jun-17
112 68
100%
0 0
02-Apr-17 A 04-Apr-17 A
11-Mar-18 A 04-Dec-17 A
Electrical DE3500
Safety DE3730
Instrument DE6980
Khatiyah North Process DE6350
PROCESS PFDS (KAHN)
23-Mar-17 23-Mar-17
DE6360
PROCESS P&IDS (KAHN)
17-Apr-17
03-Jul-17
62
100%
0
02-Apr-17 A
11-Mar-18 A
DE6370
PROCESS P&IDS (DEMOLITION) (KAHN)
17-Apr-17
03-Jul-17
62
100%
0
02-Apr-17 A
03-Jan-18 A
DE6790
PFD FOR FIRE WATER NETWORK (KAHN)
19-Apr-17
05-Jul-17
62
100%
0
19-Apr-17 A
04-Dec-17 A
DE6340
PROCESS LINE DESIGNATION TABLES (KAHN)
12-Jun-17
28-Aug-17
62
100%
0
11-Jul-17 A
24-Jan-18 A
EARLY TIE-IN VALVE LIST (KAHN)
07-Mar-17 07-Mar-17
20-Sep-17 22-May-17
142 62
100%
0 0
12-Mar-17 A 15-Mar-17 A
13-Apr-18 A 12-Jun-17 A
DE6960
PIPING EQUIPMENT LOCATION PLAN (KAHN)
29-Mar-17
13-Jun-17
62
100%
0
09-Apr-17 A
21-Jan-18 A
DE6490
PIPING PLOT PLANS (KAHN)
29-Mar-17
14-Jun-17
63
100%
0
12-Mar-17 A
21-Jan-18 A
DE6620
PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (KAHN)
16-May-17
10-Aug-17
71
100%
0
25-May-17 A
02-Nov-17 A
DE6640
PIPING STRESS ANALYSIS REPORT (KAHN)
05-Jun-17
20-Aug-17
62
100%
0
07-Jun-17 A
21-Jan-18 A
DE6660
PIPING MTOS (KAHN)
11-Jun-17
27-Aug-17
63
100%
0
11-Jul-17 A
10-Jan-18 A
DE6670
PIPING CRITICAL LINE LIST (KAHN)
21-Jun-17
06-Sep-17
63
100%
0
21-Jun-17 A
29-Aug-17 A
DE6520
PLOT PLANS (DEMOLITION) (KAHN)
25-Jun-17
10-Sep-17
63
100%
0
29-Jun-17 A
18-Oct-17 A
Piping DE6870
TF
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:45
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 16 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule.
Page 4 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
DE6650
PIPING KEY PLANS (KAHN)
29-Jun-17
14-Sep-17
63
100%
0
06-Jul-17 A
28-Nov-17 A
DE6510
PIPING G.A (KAHN)
13-Jul-17
19-Sep-17
55
100%
0
15-Jul-17 A
21-Feb-18 A
DE6680
PIPING MTOS (DEMOLITION) (KAHN)
16-Jul-17
17-Aug-17
28
100%
0
05-May-17 A
10-Jan-18 A
DE6500
PIPING TIE-IN PACKAGES & SCHEDULES (KAHN)
18-Jul-17
11-Sep-17
45
100%
0
15-Jul-17 A
13-Apr-18 A
DE6610
PIPE SUPPORT LIST (KAHN)
27-Jul-17
18-Sep-17
43
100%
0
14-Oct-17 A
21-Jan-18 A
DE6530
PIPING G.A (DEMOLITION) (KAHN)
03-Aug-17
20-Sep-17
39
100%
0
20-Aug-17 A
19-Nov-17 A
DE6630
PIPING ISOMETRICS (KAHN)
09-Aug-17
14-Sep-17
30
100%
0
29-Dec-17 A
01-Apr-18 A
07-Sep-17 10-Aug-17
105 96
14-Apr-17 A 14-Apr-17 A
26-Feb-18 A 05-Oct-17 A
04-May-17 A
25-Sep-17 A
ELECTRICAL CALCULATIONS (KAHN)
13-Apr-17 13-Apr-17
100%
0 0
DE6380
TIE-IN, CABLES & INTERCONNECTION SCHEDULES (KAHN)
25-May-17
07-Sep-17
84
100%
0
DE6400
ELECTRICAL ADEQUACY REORTS (KAHN)
29-May-17
14-Aug-17
62
100%
0
01-Jun-17 A
24-Sep-17 A
DE6390
SINGLE LINE DIAGRAMS (KAHN)
15-Jun-17
31-Aug-17
62
100%
0
07-May-17 A
25-Sep-17 A
DE6700
LIGHTING LAYOUT (KAHN)
15-Jun-17
22-Aug-17
55
100%
0
22-May-17 A
03-Aug-17 A
DE6720
EARTHING & CABLE ROUTING LAYOUTS (KAHN)
15-Jun-17
31-Aug-17
62
100%
0
17-Jun-17 A
29-Oct-17 A
DE6710
ELECTRICAL MTOS (KAHN)
09-Jul-17
10-Aug-17
27
100%
0
04-Jul-17 A
26-Feb-18 A
DRAINAGE LAYOUTS & DETAILS (KAHN)
18-Apr-17 18-Apr-17
15-Aug-17 04-Jul-17
86 63
100%
0 0
21-Mar-17 A 22-Mar-17 A
07-Mar-18 A 04-Feb-18 A
Electrical DE6690
Civil DE7180 DE6450
GRADING & ROAD LAYOUTS & DETAILS (KAHN)
18-Apr-17
04-Jul-17
63
100%
0
21-Mar-17 A
07-Feb-18 A
DE6460
PLATFORMS STRUCTURAL DETAILS (KAHN)
16-May-17
01-Aug-17
63
100%
0
25-May-17 A
05-Feb-18 A
DE6470
FOUNDATIONS GA, PLANS & DETAILS (KAHN)
16-May-17
15-Aug-17
74
100%
0
25-May-17 A
07-Mar-18 A
DE6480
PIPE SUPPORT LAYOUTS & SCHEDULES (KAHN)
16-May-17
01-Aug-17
63
100%
0
28-Nov-17 A
13-Dec-17 A
HAZARDOUS AREA SCHEDULES (KAHN)
18-May-17 18-May-17
21-Aug-17 03-Aug-17
67 62
100%
0 0
03-May-17 A 25-May-17 A
26-Aug-18 A 22-Mar-18 A
DE6560
HSE LAYOUTS (DEMOLITION) (KAHN)
18-May-17
03-Aug-17
62
100%
0
25-May-17 A
26-Aug-18 A
DE6570
F&G AND PROCESS CAUSE & EFFECT CHARTS (KAHN)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
08-Apr-18 A
DE6550
HSE LAYOUTS (KAHN)
24-May-17
08-Aug-17
61
100%
0
25-May-17 A
26-Aug-18 A
DE6580
HSE DATA SHEETS (KAHN)
24-May-17
21-Aug-17
71
100%
0
03-May-17 A
24-Jan-18 A
DE6590
HSE P&IDS (KAHN)
24-May-17
10-Aug-17
63
100%
0
03-May-17 A
11-Jan-18 A
DE7130
DEMOLITION PROCESS CAUSE & EFFECT CHARTS (KAHN)
29-May-17
14-Aug-17
62
100%
0
08-Jul-17 A
23-Aug-17 A
INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (KAHN)
20-Apr-17 20-Apr-17
20-Sep-17 15-Aug-17
110 95
100%
0 0
14-Mar-17 A 11-May-17 A
26-Feb-18 A 25-Jan-18 A
DE6600
INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (KAHN)
27-Apr-17
10-Aug-17
86
100%
0
18-May-17 A
12-Oct-17 A
DE6410
INPUT/OUTPUT LISTS (DEMOLITION) (KAHN)
27-Apr-17
13-Jul-17
63
100%
0
14-Mar-17 A
26-Jul-17 A
DE6730
INSTRUMENTS DATA SHEETS (KAHN)
01-May-17
08-Aug-17
81
100%
0
04-Apr-17 A
21-Dec-17 A
DE6430
INSTRUMENTS DIAGRAMS (KAHN)
04-May-17
20-Sep-17
113
100%
0
25-May-17 A
26-Feb-18 A
DE6420
INSTRUMENTS INDEX (KAHN)
30-May-17
14-Aug-17
62
100%
0
31-May-17 A
19-Oct-17 A
DE6740
INPUT/OUTPUT AND ALARM & TRIP LISTS (KAHN)
04-Jun-17
03-Sep-17
74
100%
0
07-Jun-17 A
10-Dec-17 A
DE6440
INSTRUMENTS SCOPE OF WORK (KAHN)
13-Jun-17
29-Aug-17
63
100%
0
11-Jul-17 A
19-Oct-17 A
DE6750
INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (KAHN)
25-Jun-17
12-Sep-17
65
100%
0
28-Jun-17 A
19-Oct-17 A
DE6760
INSTRUMENTS MTO (KAHN)
09-Aug-17
12-Sep-17
28
100%
0
28-Sep-17 A
14-Dec-17 A
07-Mar-17
20-Sep-17
142
0
15-Mar-17 A
11-Jul-18 A
28-Aug-17 08-Jun-17
112 62
02-Apr-17 A 04-Apr-17 A
11-Mar-18 A 04-Dec-17 A
Safety DE6540
Instrument DE7060
Khatiyah Main Process DE3830
PROCESS PFDS (KAHM)
23-Mar-17 23-Mar-17
100%
0 0
DE3840
PROCESS P&IDS (KAHM)
17-Apr-17
03-Jul-17
62
100%
0
02-Apr-17 A
11-Mar-18 A
DE3850
PROCESS P&IDS (DEMOLITION) (KAHM)
17-Apr-17
03-Jul-17
62
100%
0
02-Apr-17 A
02-Jan-18 A
DE6800
PFD FOR FIRE WATER NETWORK (KAHM)
19-Apr-17
05-Jul-17
62
100%
0
19-Apr-17 A
04-Dec-17 A
DE3820
PROCESS LINE DESIGNATION TABLES (KAHM)
11-Jun-17
28-Aug-17
63
100%
0
08-Jul-17 A
24-Jan-18 A
EARLY TIE-IN VALVE LIST (KAHM)
07-Mar-17 07-Mar-17
18-Sep-17 22-May-17
140 62
100%
0 0
15-Mar-17 A 15-Mar-17 A
13-Apr-18 A 12-Jun-17 A
DE6950
PIPING EQUIPMENT LOCATION PLAN (KAHM)
29-Mar-17
13-Jun-17
62
100%
0
09-Apr-17 A
06-Mar-18 A
DE3970
PIPING PLOT PLANS (KAHM)
29-Mar-17
14-Jun-17
63
100%
0
15-Mar-17 A
21-Jan-18 A
DE4090
PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (KAHM)
14-May-17
03-Aug-17
68
100%
0
25-May-17 A
14-Nov-17 A
DE4120
PIPING KEY PLANS (KAHM)
25-May-17
10-Aug-17
63
100%
0
01-Jun-17 A
26-Nov-17 A
DE3990
PIPING G.A (KAHM)
30-May-17
15-Aug-17
63
100%
0
31-May-17 A
22-Mar-18 A
DE4110
PIPING STRESS ANALYSIS REPORT (KAHM)
30-May-17
15-Aug-17
63
100%
0
01-Jun-17 A
21-Jan-18 A
DE4000
PLOT PLANS (DEMOLITION) (KAHM)
04-Jun-17
21-Aug-17
64
100%
0
07-Jun-17 A
18-Oct-17 A
DE4130
PIPING MTOS (KAHM)
08-Jun-17
24-Aug-17
63
100%
0
08-Jul-17 A
10-Jan-18 A
Piping DE6880
TF
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:45
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 17 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Page 5 of32 Act. Fin / F-C Fin
DE3980
PIPING TIE-IN PACKAGES & SCHEDULES (KAHM)
15-Jun-17
14-Aug-17
48
100%
0
20-Jul-17 A
13-Apr-18 A
DE4140
PIPING CRITICAL LINE LIST (KAHM)
21-Jun-17
06-Sep-17
63
100%
0
21-Jun-17 A
29-Aug-17 A
DE4150
PIPING MTOS (DEMOLITION) (KAHM)
04-Jul-17
07-Aug-17
28
100%
0
05-May-17 A
10-Jan-18 A
DE4010
PIPING G.A (DEMOLITION) (KAHM)
09-Jul-17
18-Sep-17
59
100%
0
08-Jul-17 A
23-Nov-17 A
DE4080
PIPE SUPPORT LIST (KAHM)
27-Jul-17
18-Sep-17
43
100%
0
02-Oct-17 A
23-Jan-18 A
DE4100
PIPING ISOMETRICS (KAHM)
03-Aug-17
05-Sep-17
27
100%
0
31-Dec-17 A
01-Apr-18 A
17-Sep-17 02-Aug-17
115 95
14-Apr-17 A 14-Apr-17 A
26-Feb-18 A 05-Oct-17 A
ELECTRICAL CALCULATIONS (KAHM)
06-Apr-17 06-Apr-17
100%
0 0
DE3860
TIE-IN, CABLES & INTERCONNECTION SCHEDULES (KAHM)
14-May-17
17-Sep-17
101
100%
0
06-May-17 A
04-Dec-17 A
DE3880
ELECTRICAL ADEQUACY REORTS (KAHM)
18-May-17
03-Aug-17
62
100%
0
25-May-17 A
22-Nov-17 A
DE3870
SINGLE LINE DIAGRAMS (KAHM)
07-Jun-17
23-Aug-17
62
100%
0
07-May-17 A
24-Sep-17 A
DE4170
LIGHTING LAYOUT (KAHM)
29-Jun-17
14-Sep-17
62
100%
0
27-May-17 A
03-Aug-17 A
DE4190
EARTHING & CABLE ROUTING LAYOUTS (KAHM)
29-Jun-17
14-Sep-17
62
100%
0
17-Jun-17 A
02-Nov-17 A
DE4180
ELECTRICAL MTOS (KAHM)
09-Jul-17
10-Aug-17
27
100%
0
04-Jul-17 A
26-Feb-18 A
GRADING & ROAD LAYOUTS & DETAILS (KAHM)
26-Apr-17 26-Apr-17
15-Aug-17 13-Jul-17
80 64
100%
0 0
05-Apr-17 A 05-Apr-17 A
15-Apr-18 A 12-Feb-18 A
Electrical DE4160
Civil DE3930 DE7190
DRAINAGE LAYOUTS & DETAILS (KAHM)
27-Apr-17
13-Jul-17
62
100%
0
05-Apr-17 A
12-Feb-18 A
DE3940
PLATFORMS STRUCTURAL DETAILS (KAHM)
22-May-17
08-Aug-17
64
100%
0
01-Jun-17 A
08-Feb-18 A
DE3950
FOUNDATIONS GA, PLANS & DETAILS (KAHM)
22-May-17
15-Aug-17
70
100%
0
25-May-17 A
15-Apr-18 A
DE3960
PIPE SUPPORT LAYOUTS & SCHEDULES (KAHM)
22-May-17
31-Jul-17
57
100%
0
28-Nov-17 A
19-Dec-17 A
HAZARDOUS AREA SCHEDULES (KAHM)
18-May-17 18-May-17
15-Aug-17 03-Aug-17
63 62
100%
0 0
03-May-17 A 25-May-17 A
11-Jul-18 A 22-Mar-18 A
DE4030
HSE LAYOUTS (KAHM)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
11-Jul-18 A
DE4040
F&G AND PROCESS CAUSE & EFFECT CHARTS (KAHM)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
05-May-18 A
DE4050
HSE DATA SHEETS (KAHM)
18-May-17
15-Aug-17
71
100%
0
03-May-17 A
24-Jan-18 A
DE4060
HSE P&IDS (KAHM)
18-May-17
06-Aug-17
63
100%
0
04-May-17 A
11-Jan-18 A
DE7140
DEMOLITION PROCESS CAUSE & EFFECT CHARTS (KAHM)
29-May-17
14-Aug-17
62
100%
0
11-Jul-17 A
23-Aug-17 A
INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (KAHM)
20-Apr-17 20-Apr-17
20-Sep-17 15-Aug-17
110 95
100%
0 0
15-Mar-17 A 11-May-17 A
22-Feb-18 A 25-Jan-18 A
DE3890
INPUT/OUTPUT LISTS (DEMOLITION) (KAHM)
27-Apr-17
13-Jul-17
63
100%
0
15-Mar-17 A
26-Jul-17 A
DE4070
INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (KAHM)
27-Apr-17
10-Aug-17
86
100%
0
18-May-17 A
12-Oct-17 A
DE4200
INSTRUMENTS DATA SHEETS (KAHM)
01-May-17
08-Aug-17
81
100%
0
04-Apr-17 A
21-Dec-17 A
DE3910
INSTRUMENTS DIAGRAMS (KAHM)
04-May-17
20-Sep-17
113
100%
0
25-May-17 A
22-Feb-18 A
DE3900
INSTRUMENTS INDEX (KAHM)
30-May-17
15-Aug-17
62
100%
0
31-May-17 A
19-Oct-17 A
DE4210
INPUT/OUTPUT AND ALARM & TRIP LISTS (KAHM)
04-Jun-17
03-Sep-17
74
100%
0
07-Jun-17 A
10-Dec-17 A
DE3920
INSTRUMENTS SCOPE OF WORK (KAHM)
13-Jun-17
29-Aug-17
63
100%
0
08-Jul-17 A
19-Oct-17 A
DE4220
INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (KAHM)
22-Jun-17
12-Sep-17
65
100%
0
28-Jun-17 A
19-Oct-17 A
DE4230
INSTRUMENTS MTO (KAHM)
09-Aug-17
12-Sep-17
28
100%
0
28-Sep-17 A
14-Dec-17 A
07-Mar-17
20-Sep-17
142
0
14-Mar-17 A
11-Jul-18 A
PROCESS PFDS (KAHS)
23-Mar-17 23-Mar-17
29-Aug-17 08-Jun-17
113 62
100%
0 0
02-Apr-17 A 04-Apr-17 A
30-Jan-18 A 04-Dec-17 A
DE6810
PFD FOR FIRE WATER NETWORK (KAHS)
19-Apr-17
05-Jul-17
62
100%
0
19-Apr-17 A
04-Dec-17 A
DE4260
PROCESS P&IDS (KAHS)
20-Apr-17
06-Jul-17
62
100%
0
02-Apr-17 A
30-Jan-18 A
DE4270
PROCESS P&IDS (DEMOLITION) (KAHS)
20-Apr-17
06-Jul-17
62
100%
0
02-Apr-17 A
29-Nov-17 A
DE4240
PROCESS LINE DESIGNATION TABLES (KAHS)
13-Jun-17
29-Aug-17
62
100%
0
08-Jul-17 A
24-Jan-18 A
EARLY TIE-IN VALVE LIST (KAHS)
07-Mar-17 07-Mar-17
20-Sep-17 22-May-17
142 62
100%
0 0
14-Mar-17 A 15-Mar-17 A
13-Apr-18 A 12-Jun-17 A
DE6940
PIPING EQUIPMENT LOCATION PLAN (KAHS)
29-Mar-17
13-Jun-17
62
100%
0
09-Apr-17 A
21-Jan-18 A
DE4390
PIPING PLOT PLANS (KAHS)
02-Apr-17
15-Jun-17
62
100%
0
14-Mar-17 A
21-Jan-18 A
DE4510
PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (KAHS)
15-May-17
08-Aug-17
70
100%
0
25-May-17 A
24-Jan-18 A
DE4560
PIPING CRITICAL LINE LIST (KAHS)
22-May-17
07-Aug-17
63
100%
0
25-May-17 A
29-Aug-17 A
DE4530
PIPING STRESS ANALYSIS REPORT (KAHS)
08-Jun-17
24-Aug-17
63
100%
0
08-Jul-17 A
31-Jan-18 A
DE4550
PIPING MTOS (KAHS)
14-Jun-17
30-Aug-17
63
100%
0
08-Jul-17 A
10-Jan-18 A
DE4540
PIPING KEY PLANS (KAHS)
19-Jun-17
04-Sep-17
63
100%
0
22-Jun-17 A
28-Nov-17 A
DE4410
PIPING G.A (KAHS)
22-Jun-17
07-Sep-17
63
100%
0
28-Jun-17 A
18-Mar-18 A
DE4420
PLOT PLANS (DEMOLITION) (KAHS)
27-Jun-17
13-Sep-17
64
100%
0
28-Jun-17 A
03-Aug-17 A
DE4570
PIPING MTOS (DEMOLITION) (KAHS)
09-Jul-17
10-Aug-17
28
100%
0
05-May-17 A
10-Jan-18 A
Safety DE4020
Instrument DE7050
Khatiyah South Process DE4250
Piping DE6890
TF
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:45
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 18 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Page 6 of32 Act. Fin / F-C Fin
DE4400
PIPING TIE-IN PACKAGES & SCHEDULES (KAHS)
20-Jul-17
13-Sep-17
45
100%
0
27-Jul-17 A
13-Apr-18 A
DE4430
PIPING G.A (DEMOLITION) (KAHS)
27-Jul-17
20-Sep-17
45
100%
0
16-Aug-17 A
05-Dec-17 A
DE4500
PIPE SUPPORT LIST (KAHS)
27-Jul-17
18-Sep-17
43
100%
0
14-Oct-17 A
11-Jan-18 A
DE4520
PIPING ISOMETRICS (KAHS)
06-Aug-17
10-Sep-17
29
100%
0
02-Jan-18 A
01-Apr-18 A
ELECTRICAL CALCULATIONS (KAHS)
06-Apr-17 06-Apr-17
19-Sep-17 27-Jul-17
118 89
100%
0 0
14-Apr-17 A 14-Apr-17 A
26-Feb-18 A 28-Sep-17 A
DE4300
ELECTRICAL ADEQUACY REORTS (KAHS)
20-Apr-17
09-Jul-17
63
100%
0
25-May-17 A
20-Sep-17 A
DE4290
SINGLE LINE DIAGRAMS (KAHS)
04-Jun-17
17-Sep-17
84
100%
0
07-May-17 A
20-Sep-17 A
DE4280
TIE-IN, CABLES & INTERCONNECTION SCHEDULES (KAHS)
14-Jun-17
14-Sep-17
74
100%
0
04-May-17 A
25-Sep-17 A
DE4610
EARTHING & CABLE ROUTING LAYOUTS (KAHS)
22-Jun-17
19-Sep-17
71
100%
0
17-Jun-17 A
08-Nov-17 A
DE4590
LIGHTING LAYOUT (KAHS)
29-Jun-17
14-Sep-17
62
100%
0
25-May-17 A
03-Aug-17 A
DE4600
ELECTRICAL MTOS (KAHS)
09-Jul-17
10-Aug-17
27
100%
0
04-Jul-17 A
26-Feb-18 A
GRADING & ROAD LAYOUTS & DETAILS (KAHS)
03-May-17 03-May-17
29-Aug-17 20-Jul-17
85 64
100%
0 0
22-Mar-17 A 22-Mar-17 A
12-Mar-18 A 20-Jan-18 A
DE7200
DRAINAGE LAYOUTS & DETAILS (KAHS)
03-May-17
20-Jul-17
64
100%
0
22-Mar-17 A
04-Feb-18 A
DE4360
PLATFORMS STRUCTURAL DETAILS (KAHS)
13-Jun-17
29-Aug-17
63
100%
0
08-Jul-17 A
12-Feb-18 A
DE4370
FOUNDATIONS GA, PLANS & DETAILS (KAHS)
13-Jun-17
29-Aug-17
63
100%
0
08-Jul-17 A
12-Mar-18 A
DE4380
PIPE SUPPORT LAYOUTS & SCHEDULES (KAHS)
13-Jun-17
29-Aug-17
63
100%
0
28-Nov-17 A
19-Dec-17 A
HAZARDOUS AREA SCHEDULES (KAHS)
18-May-17 18-May-17
20-Aug-17 03-Aug-17
66 62
100%
0 0
03-May-17 A 25-May-17 A
11-Jul-18 A 22-Mar-18 A
DE4460
F&G AND PROCESS CAUSE & EFFECT CHARTS (KAHS)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
05-May-18 A
DE4450
HSE LAYOUTS (KAHS)
23-May-17
08-Aug-17
62
100%
0
25-May-17 A
11-Jul-18 A
DE4470
HSE DATA SHEETS (KAHS)
23-May-17
20-Aug-17
71
100%
0
03-May-17 A
24-Jan-18 A
DE4480
HSE P&IDS (KAHS)
23-May-17
09-Aug-17
63
100%
0
04-May-17 A
11-Jan-18 A
20-Sep-17 15-Aug-17
110 95
100%
0 0
21-Mar-17 A 11-May-17 A
26-Feb-18 A 25-Jan-18 A
10-Aug-17
86
100%
0
18-May-17 A
19-Oct-17 A
Electrical DE4580
Civil DE4350
Safety DE4440
INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (KAHS)
20-Apr-17 20-Apr-17
DE4490
INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (KAHS)
27-Apr-17
DE4310
INPUT/OUTPUT LISTS (DEMOLITION) (KAHS)
27-Apr-17
13-Jul-17
63
100%
0
21-Mar-17 A
20-Jun-17 A
DE4620
INSTRUMENTS DATA SHEETS (KAHS)
01-May-17
08-Aug-17
81
100%
0
04-Apr-17 A
21-Dec-17 A
DE4330
INSTRUMENTS DIAGRAMS (KAHS)
04-May-17
20-Sep-17
113
100%
0
25-May-17 A
26-Feb-18 A
DE4320
INSTRUMENTS INDEX (KAHS)
30-May-17
14-Aug-17
62
100%
0
31-May-17 A
19-Oct-17 A
DE4630
INPUT/OUTPUT AND ALARM & TRIP LISTS (KAHS)
04-Jun-17
03-Sep-17
74
100%
0
07-Jun-17 A
10-Dec-17 A
DE4340
INSTRUMENTS SCOPE OF WORK (KAHS)
13-Jun-17
29-Aug-17
63
100%
0
08-Jul-17 A
19-Oct-17 A
DE4640
INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (KAHS)
25-Jun-17
12-Sep-17
65
100%
0
28-Jun-17 A
19-Oct-17 A
DE4650
INSTRUMENTS MTO (KAHS)
09-Aug-17
12-Sep-17
28
100%
0
28-Sep-17 A
13-Dec-17 A
23-Mar-17
20-Sep-17
130
27
15-Mar-17 A
02-Dec-18
20-Aug-17 08-Jun-17
106 62
02-Apr-17 A 04-Apr-17 A
11-Mar-18 A 14-Dec-17 A 14-Dec-17 A
Instrument DE7070
Fahahil North PROCESS PFDS (FAHN)
23-Mar-17 23-Mar-17
100%
0 0
DE6820
PFD FOR FIRE WATER NETWORK (FAHN)
19-Apr-17
05-Jul-17
62
100%
0
05-Apr-17 A
DE4690
PROCESS P&IDS (DEMOLITION) (FAHN)
27-Apr-17
13-Jul-17
62
100%
0
03-May-17 A
03-Jan-18 A
DE4680
PROCESS P&IDS (FAHN)
27-Apr-17
13-Jul-17
62
100%
0
02-Apr-17 A
11-Mar-18 A
DE4660
PROCESS LINE DESIGNATION TABLES (FAHN)
04-Jun-17
20-Aug-17
62
100%
0
07-Jun-17 A
24-Jan-18 A
PIPING PLOT PLANS (FAHN)
23-Mar-17 23-Mar-17
20-Sep-17 08-Jun-17
130 63
100%
27 0
29-Mar-17 A 29-Mar-17 A
02-Dec-18 21-Jan-18 A
Process DE4670
Piping DE4810 DE6930
PIPING EQUIPMENT LOCATION PLAN (FAHN)
29-Mar-17
13-Jun-17
62
100%
0
09-Apr-17 A
21-Jan-18 A
DE4930
PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (FAHN)
22-May-17
15-Aug-17
70
100%
0
25-May-17 A
05-Nov-17 A
DE4840
PLOT PLANS (DEMOLITION) (FAHN)
29-May-17
14-Aug-17
63
100%
0
01-Jun-17 A
18-Oct-17 A
DE4970
PIPING MTOS (FAHN)
30-May-17
15-Aug-17
63
100%
0
01-Jun-17 A
10-Jan-18 A
DE4950
PIPING STRESS ANALYSIS REPORT (FAHN)
15-Jun-17
19-Jul-17
28
100%
0
21-Jun-17 A
07-Feb-18 A
DE4980
PIPING CRITICAL LINE LIST (FAHN)
15-Jun-17
11-Sep-17
71
100%
0
21-Jun-17 A
29-Aug-17 A
DE4990
PIPING MTOS (DEMOLITION) (FAHN)
26-Jun-17
30-Jul-17
28
100%
0
01-Jun-17 A
10-Jan-18 A
DE4850
PIPING G.A (DEMOLITION) (FAHN)
16-Jul-17
19-Sep-17
54
100%
0
15-Jul-17 A
16-Oct-17 A
DE4920
PIPE SUPPORT LIST (FAHN)
17-Jul-17
10-Sep-17
45
100%
0
15-Jul-17 A
21-Jan-18 A
DE4960
PIPING KEY PLANS (FAHN)
20-Jul-17
13-Sep-17
45
100%
0
27-Jul-17 A
21-Jan-18 A
DE4820
PIPING TIE-IN PACKAGES & SCHEDULES (FAHN)
20-Jul-17
17-Sep-17
47
95%
27
27-Jul-17 A
02-Dec-18
DE4830
PIPING G.A (FAHN)
03-Aug-17
20-Sep-17
39
100%
0
19-Oct-17 A
18-Mar-18 A
DE4940
PIPING ISOMETRICS (FAHN)
10-Aug-17
19-Sep-17
33
100%
0
18-Jan-18 A
01-Apr-18 A
TF
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:45
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
166
166
166
Page 19 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
Electrical DE5000
ELECTRICAL CALCULATIONS (FAHN)
U3963- Updated Revised Baseline Schedule.
Page 7 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
23-Apr-17 23-Apr-17
17-Aug-17 10-Aug-17
84 89
100%
0 0
14-Apr-17 A 14-Apr-17 A
07-Dec-17 A 28-Sep-17 A
DE4700
TIE-IN, CABLES & INTERCONNECTION SCHEDULES (FAHN)
23-Apr-17
24-Jul-17
74
100%
0
25-Apr-17 A
07-Dec-17 A
DE5010
LIGHTING LAYOUT (FAHN)
02-May-17
19-Jul-17
63
100%
0
22-May-17 A
03-Aug-17 A
DE4720
ELECTRICAL ADEQUACY REORTS (FAHN)
07-May-17
23-Jul-17
62
100%
0
25-May-17 A
19-Oct-17 A
DE4710
SINGLE LINE DIAGRAMS (FAHN)
09-May-17
26-Jul-17
63
100%
0
07-May-17 A
24-Sep-17 A
DE5030
EARTHING & CABLE ROUTING LAYOUTS (FAHN)
01-Jun-17
17-Aug-17
62
100%
0
07-Jun-17 A
04-Dec-17 A
DE5020
ELECTRICAL MTOS (FAHN)
09-Jul-17
10-Aug-17
27
100%
0
04-Jul-17 A
01-Oct-17 A
05-Sep-17 27-Jul-17
84 63
25-May-17 A 25-May-17 A
19-Mar-18 A 05-Mar-18 A
DRAINAGE LAYOUTS & DETAILS (FAHN)
11-May-17 11-May-17
100%
0 0
DE4770
GRADING & ROAD LAYOUTS & DETAILS (FAHN)
11-May-17
27-Jul-17
63
100%
0
25-May-17 A
18-Feb-18 A
DE4780
PLATFORMS STRUCTURAL DETAILS (FAHN)
20-Jun-17
05-Sep-17
63
100%
0
21-Jun-17 A
18-Mar-18 A
DE4790
FOUNDATIONS GA, PLANS & DETAILS (FAHN)
20-Jun-17
05-Sep-17
63
100%
0
21-Jun-17 A
19-Mar-18 A
DE4800
PIPE SUPPORT LAYOUTS & SCHEDULES (FAHN)
20-Jun-17
05-Sep-17
63
100%
0
21-Jun-17 A
05-Mar-18 A
HAZARDOUS AREA SCHEDULES (FAHN)
18-May-17 18-May-17
15-Aug-17 03-Aug-17
63 62
100%
0 0
03-May-17 A 25-May-17 A
08-Jul-18 A 22-Mar-18 A
DE4870
HSE LAYOUTS (FAHN)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
08-Jul-18 A
DE4880
F&G AND PROCESS CAUSE & EFFECT CHARTS (FAHN)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
05-May-18 A
DE4890
HSE DATA SHEETS (FAHN)
18-May-17
15-Aug-17
71
100%
0
03-May-17 A
24-Jan-18 A
DE4900
HSE P&IDS (FAHN)
18-May-17
06-Aug-17
63
100%
0
03-May-17 A
11-Jan-18 A
DE7150
DEMOLITION PROCESS CAUSE & EFFECT CHARTS (FAHN)
29-May-17
14-Aug-17
62
100%
0
11-Jul-17 A
23-Aug-17 A
INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (FAHN)
20-Apr-17 20-Apr-17
20-Sep-17 15-Aug-17
110 95
100%
0 0
15-Mar-17 A 11-May-17 A
12-Mar-18 A 25-Jan-18 A
Civil DE7210
Safety DE4860
Instrument DE7020 DE4910
INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (FAHN)
27-Apr-17
10-Aug-17
86
100%
0
18-May-17 A
10-Oct-17 A
DE5040
INSTRUMENTS DATA SHEETS (FAHN)
01-May-17
08-Aug-17
81
100%
0
04-Apr-17 A
26-Dec-17 A
DE4750
INSTRUMENTS DIAGRAMS (FAHN)
04-May-17
20-Sep-17
113
100%
0
25-May-17 A
12-Mar-18 A
DE7080
INSTRUMENTS BUILDING LAYOUT (FAHN)
16-May-17
01-Aug-17
63
100%
0
17-May-17 A
25-Jul-17 A
DE4740
INSTRUMENTS INDEX (FAHN)
30-May-17
14-Aug-17
62
100%
0
31-May-17 A
20-Nov-17 A
DE5050
INPUT/OUTPUT AND ALARM & TRIP LISTS (FAHN)
04-Jun-17
03-Sep-17
74
100%
0
08-Jun-17 A
10-Dec-17 A
DE4760
INSTRUMENTS SCOPE OF WORK (FAHN)
13-Jun-17
29-Aug-17
63
100%
0
08-Jul-17 A
19-Oct-17 A
DE4730
INPUT/OUTPUT LISTS (DEMOLITION) (FAHN)
15-Jun-17
14-Aug-17
48
100%
0
15-Mar-17 A
26-Jul-17 A
DE5060
INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (FAHN)
25-Jun-17
12-Sep-17
65
100%
0
28-Jun-17 A
19-Oct-17 A
DE5070
INSTRUMENTS MTO (FAHN)
09-Aug-17
12-Sep-17
28
100%
0
28-Sep-17 A
14-Dec-17 A
23-Mar-17
20-Sep-17
130
27
15-Mar-17 A
02-Dec-18
PROCESS PFDS (FAHM)
23-Mar-17 23-Mar-17
16-Aug-17 08-Jun-17
104 62
100%
0 0
02-Apr-17 A 04-Apr-17 A
11-Mar-18 A 04-Dec-17 A
DE6830
PFD FOR FIRE WATER NETWORK (FAHM)
19-Apr-17
05-Jul-17
62
100%
0
19-Apr-17 A
04-Dec-17 A
DE5940
PROCESS P&IDS (FAHM)
20-Apr-17
06-Jul-17
62
100%
0
02-Apr-17 A
11-Mar-18 A
DE5950
PROCESS P&IDS (DEMOLITION) (FAHM)
20-Apr-17
06-Jul-17
62
100%
0
27-Apr-17 A
02-Jan-18 A
DE5920
PROCESS LINE DESIGNATION TABLES (FAHM)
30-May-17
16-Aug-17
63
100%
0
31-May-17 A
24-Jan-18 A
PIPING EQUIPMENT LOCATION PLAN (FAHM)
29-Mar-17 29-Mar-17
20-Sep-17 13-Jun-17
126 62
100%
27 0
15-Mar-17 A 09-Apr-17 A
02-Dec-18 25-Jan-18 A
Fahahil Main Process DE5930
Piping DE6920 DE6070
PIPING PLOT PLANS (FAHM)
29-Mar-17
14-Jun-17
63
100%
0
29-Mar-17 A
25-Jan-18 A
DE6190
PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (FAHM)
18-May-17
20-Sep-17
101
100%
0
25-May-17 A
26-Oct-17 A
DE6100
PLOT PLANS (DEMOLITION) (FAHM)
21-May-17
03-Aug-17
62
100%
0
25-May-17 A
18-Oct-17 A
DE6230
PIPING MTOS (FAHM)
15-Jun-17
19-Jul-17
28
100%
0
22-Jun-17 A
10-Jan-18 A
DE6240
PIPING CRITICAL LINE LIST (FAHM)
15-Jun-17
31-Aug-17
63
100%
0
22-Jun-17 A
14-Sep-17 A
DE6220
PIPING KEY PLANS (FAHM)
19-Jun-17
04-Sep-17
63
100%
0
15-Mar-17 A
21-Jan-18 A
DE6090
PIPING G.A (FAHM)
20-Jun-17
29-Aug-17
57
100%
0
19-Oct-17 A
18-Mar-18 A
DE6210
PIPING STRESS ANALYSIS REPORT (FAHM)
29-Jun-17
02-Aug-17
28
100%
0
03-Jul-17 A
29-Jan-18 A
DE6250
PIPING MTOS (DEMOLITION) (FAHM)
29-Jun-17
02-Aug-17
28
100%
0
22-Jul-17 A
10-Jan-18 A
DE6110
PIPING G.A (DEMOLITION) (FAHM)
09-Jul-17
18-Sep-17
59
100%
0
08-Jul-17 A
13-Nov-17 A
DE6080
PIPING TIE-IN PACKAGES & SCHEDULES (FAHM)
25-Jul-17
17-Sep-17
44
90%
27
15-Jul-17 A
02-Dec-18
DE6180
PIPE SUPPORT LIST (FAHM)
27-Jul-17
18-Sep-17
43
100%
0
02-Oct-17 A
21-Jan-18 A
DE6200
PIPING ISOMETRICS (FAHM)
14-Aug-17
17-Sep-17
28
100%
0
18-Jan-18 A
01-Apr-18 A
TIE-IN, CABLES & INTERCONNECTION SCHEDULES (FAHM)
13-Apr-17 13-Apr-17
10-Aug-17 17-Jul-17
85 77
100%
0 0
14-Apr-17 A 19-Apr-17 A
09-Jan-18 A 20-Sep-17 A
Electrical DE5960
TF
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
166
166
166
Page 20 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Page 8 of32
Act.Start / F-C Start
Act. Fin / F-C Fin
DE6260
ELECTRICAL CALCULATIONS (FAHM)
16-Apr-17
09-Jul-17
68
100%
0
14-Apr-17 A
19-Sep-17 A
DE5980
ELECTRICAL ADEQUACY REORTS (FAHM)
19-Apr-17
28-Jun-17
57
100%
0
25-May-17 A
24-Sep-17 A
DE5970
SINGLE LINE DIAGRAMS (FAHM)
02-May-17
18-Jul-17
63
100%
0
07-May-17 A
20-Sep-17 A
DE6270
LIGHTING LAYOUT (FAHM)
02-May-17
18-Jul-17
62
100%
0
21-May-17 A
03-Aug-17 A
DE6290
EARTHING & CABLE ROUTING LAYOUTS (FAHM)
02-May-17
18-Jul-17
62
100%
0
25-May-17 A
09-Jan-18 A
DE6280
ELECTRICAL MTOS (FAHM)
09-Jul-17
10-Aug-17
27
100%
0
04-Jul-17 A
28-Sep-17 A
DRAINAGE LAYOUTS & DETAILS (FAHM)
16-May-17 16-May-17
19-Sep-17 01-Aug-17
91 63
100%
0 0
25-May-17 A 25-May-17 A
29-Apr-18 A 05-Mar-18 A
DE6030
GRADING & ROAD LAYOUTS & DETAILS (FAHM)
16-May-17
01-Aug-17
63
100%
0
25-May-17 A
21-Feb-18 A
DE6050
FOUNDATIONS GA, PLANS & DETAILS (FAHM)
04-Jul-17
19-Sep-17
63
100%
0
03-Jul-17 A
05-Apr-18 A
DE6060
PIPE SUPPORT LAYOUTS & SCHEDULES (FAHM)
04-Jul-17
19-Sep-17
63
100%
0
04-Jul-17 A
05-Mar-18 A
DE6040
PLATFORMS STRUCTURAL DETAILS (FAHM)
04-Jul-17
19-Sep-17
63
100%
0
04-Jul-17 A
29-Apr-18 A
20-Aug-17 03-Aug-17
66 62
03-May-17 A 25-May-17 A
05-May-18 A 22-Mar-18 A
Civil DE7220
HAZARDOUS AREA SCHEDULES (FAHM)
18-May-17 18-May-17
100%
0 0
DE6140
F&G AND PROCESS CAUSE & EFFECT CHARTS (FAHM)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
05-May-18 A
DE6130
HSE LAYOUTS (FAHM)
23-May-17
08-Aug-17
62
100%
0
25-May-17 A
31-Jan-18 A
DE6150
HSE DATA SHEETS (FAHM)
23-May-17
20-Aug-17
71
100%
0
03-May-17 A
24-Jan-18 A
DE6160
HSE P&IDS (FAHM)
23-May-17
09-Aug-17
63
100%
0
03-May-17 A
11-Jan-18 A
DE7160
DEMOLITION PROCESS CAUSE & EFFECT CHARTS (FAHM)
29-May-17
14-Aug-17
62
100%
0
11-Jul-17 A
23-Aug-17 A
INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (FAHM)
20-Apr-17 20-Apr-17
20-Sep-17 15-Aug-17
110 95
100%
0 0
22-Mar-17 A 11-May-17 A
22-Mar-18 A 25-Jan-18 A
DE5990
INPUT/OUTPUT LISTS (DEMOLITION) (FAHM)
27-Apr-17
13-Jul-17
63
100%
0
22-Mar-17 A
14-Jun-17 A
DE6170
INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (FAHM)
27-Apr-17
10-Aug-17
86
100%
0
18-May-17 A
12-Oct-17 A
DE6300
INSTRUMENTS DATA SHEETS (FAHM)
01-May-17
08-Aug-17
81
100%
0
04-Apr-17 A
26-Dec-17 A
DE6010
INSTRUMENTS DIAGRAMS (FAHM)
04-May-17
20-Sep-17
113
100%
0
25-May-17 A
22-Mar-18 A
DE7090
INSTRUMENTS BUILDING LAYOUT (FAHM)
16-May-17
01-Aug-17
63
100%
0
15-May-17 A
25-Jul-17 A
DE6000
INSTRUMENTS INDEX (FAHM)
30-May-17
14-Aug-17
62
100%
0
31-May-17 A
05-Oct-17 A
DE6310
INPUT/OUTPUT AND ALARM & TRIP LISTS (FAHM)
04-Jun-17
03-Sep-17
74
100%
0
08-Jun-17 A
10-Dec-17 A
DE6020
INSTRUMENTS SCOPE OF WORK (FAHM)
13-Jun-17
29-Aug-17
63
100%
0
11-Jul-17 A
19-Oct-17 A
DE6320
INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (FAHM)
25-Jun-17
12-Sep-17
65
100%
0
28-Jun-17 A
29-Nov-17 A
DE6330
INSTRUMENTS MTO (FAHM)
09-Aug-17
12-Sep-17
28
100%
0
28-Sep-17 A
14-Dec-17 A
23-Mar-17
20-Sep-17
130
27
21-Mar-17 A
02-Dec-18
16-Aug-17 08-Jun-17
104 62
04-Apr-17 A 04-Apr-17 A
11-Mar-18 A 04-Dec-17 A
Safety DE6120
Instrument DE7010
Fahahil South PROCESS PFDS (FAHS)
23-Mar-17 23-Mar-17
100%
0 0
DE6840
PFD FOR FIRE WATER NETWORK (FAHS)
19-Apr-17
05-Jul-17
62
100%
0
19-Apr-17 A
04-Dec-17 A
DE5520
PROCESS P&IDS (FAHS)
27-Apr-17
13-Jul-17
62
100%
0
03-May-17 A
11-Mar-18 A
DE5530
PROCESS P&IDS (DEMOLITION) (FAHS)
27-Apr-17
13-Jul-17
62
100%
0
03-May-17 A
05-Oct-17 A
DE5500
PROCESS LINE DESIGNATION TABLES (FAHS)
30-May-17
16-Aug-17
63
100%
0
01-Jun-17 A
24-Jan-18 A
PIPING EQUIPMENT LOCATION PLAN (FAHS)
29-Mar-17 29-Mar-17
19-Sep-17 13-Jun-17
125 62
100%
27 0
29-Mar-17 A 09-Apr-17 A
02-Dec-18 21-Jan-18 A
DE5650
PIPING PLOT PLANS (FAHS)
29-Mar-17
14-Jun-17
63
100%
0
29-Mar-17 A
21-Jan-18 A
DE5770
PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (FAHS)
18-May-17
10-Aug-17
69
100%
0
25-May-17 A
29-Aug-17 A
DE5810
PIPING MTOS (FAHS)
01-Jun-17
17-Aug-17
63
100%
0
07-Jun-17 A
10-Jan-18 A
DE5680
PLOT PLANS (DEMOLITION) (FAHS)
11-Jun-17
27-Aug-17
63
100%
0
08-Jul-17 A
18-Oct-17 A
DE5820
PIPING CRITICAL LINE LIST (FAHS)
14-Jun-17
31-Aug-17
64
100%
0
21-Jun-17 A
14-Sep-17 A
DE5790
PIPING STRESS ANALYSIS REPORT (FAHS)
22-Jun-17
27-Jul-17
29
100%
0
29-Jun-17 A
14-Feb-18 A
DE5830
PIPING MTOS (DEMOLITION) (FAHS)
02-Jul-17
03-Aug-17
28
100%
0
07-Jun-17 A
10-Jan-18 A
DE5690
PIPING G.A (DEMOLITION) (FAHS)
20-Jul-17
13-Sep-17
45
100%
0
27-Jul-17 A
18-Oct-17 A
DE5760
PIPE SUPPORT LIST (FAHS)
20-Jul-17
13-Sep-17
45
100%
0
27-Jul-17 A
11-Jan-18 A
DE5800
PIPING KEY PLANS (FAHS)
20-Jul-17
13-Sep-17
45
100%
0
27-Jul-17 A
26-Nov-17 A
DE5660
PIPING TIE-IN PACKAGES & SCHEDULES (FAHS)
23-Jul-17
14-Sep-17
45
90%
27
16-Jul-17 A
02-Dec-18
DE5670
PIPING G.A (FAHS)
30-Jul-17
14-Sep-17
39
100%
0
12-Oct-17 A
18-Mar-18 A
DE5780
PIPING ISOMETRICS (FAHS)
16-Aug-17
19-Sep-17
28
100%
0
18-Jan-18 A
08-Apr-18 A
TIE-IN, CABLES & INTERCONNECTION SCHEDULES (FAHS)
30-Apr-17 30-Apr-17
24-Aug-17 02-Aug-17
84 77
100%
0 0
14-Apr-17 A 25-Apr-17 A
07-Dec-17 A 07-Dec-17 A
Process DE5510
Piping DE6910
Electrical DE5540 DE5840
ELECTRICAL CALCULATIONS (FAHS)
30-Apr-17
23-Jul-17
68
100%
0
14-Apr-17 A
28-Sep-17 A
DE5560
ELECTRICAL ADEQUACY REORTS (FAHS)
14-May-17
30-Jul-17
62
100%
0
25-May-17 A
07-Dec-17 A
TF
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
166
166
166
Page 21 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule.
Page 9 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
DE5550
SINGLE LINE DIAGRAMS (FAHS)
17-May-17
02-Aug-17
62
100%
0
07-May-17 A
24-Sep-17 A
DE5850
LIGHTING LAYOUT (FAHS)
08-Jun-17
24-Aug-17
62
100%
0
27-May-17 A
03-Aug-17 A
DE5870
EARTHING & CABLE ROUTING LAYOUTS (FAHS)
08-Jun-17
24-Aug-17
62
100%
0
17-Jun-17 A
08-Nov-17 A
DE5860
ELECTRICAL MTOS (FAHS)
09-Jul-17
10-Aug-17
27
100%
0
04-Jul-17 A
02-Oct-17 A
DRAINAGE LAYOUTS & DETAILS (FAHS)
24-May-17 24-May-17
18-Sep-17 08-Aug-17
84 62
100%
0 0
25-May-17 A 25-May-17 A
23-Apr-18 A 11-Apr-18 A
DE5610
GRADING & ROAD LAYOUTS & DETAILS (FAHS)
24-May-17
08-Aug-17
62
100%
0
25-May-17 A
05-Apr-18 A
DE5620
PLATFORMS STRUCTURAL DETAILS (FAHS)
09-Jul-17
18-Sep-17
59
100%
0
08-Jul-17 A
13-Mar-18 A
DE5630
FOUNDATIONS GA, PLANS & DETAILS (FAHS)
09-Jul-17
18-Sep-17
59
100%
0
08-Jul-17 A
23-Apr-18 A
DE5640
PIPE SUPPORT LAYOUTS & SCHEDULES (FAHS)
09-Jul-17
18-Sep-17
59
100%
0
08-Jul-17 A
11-Apr-18 A
HAZARDOUS AREA SCHEDULES (FAHS)
18-May-17 18-May-17
15-Aug-17 03-Aug-17
63 62
100%
0 0
03-May-17 A 25-May-17 A
12-Jul-18 A 22-Mar-18 A
DE5710
HSE LAYOUTS (FAHS)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
12-Jul-18 A
DE5720
F&G AND PROCESS CAUSE & EFFECT CHARTS (FAHS)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
05-May-18 A
DE5730
HSE DATA SHEETS (FAHS)
18-May-17
15-Aug-17
71
100%
0
03-May-17 A
24-Jan-18 A
DE5740
HSE P&IDS (FAHS)
18-May-17
06-Aug-17
63
100%
0
04-May-17 A
11-Jan-18 A
20-Sep-17 15-Aug-17
110 95
21-Mar-17 A 11-May-17 A
18-Mar-18 A 25-Jan-18 A
Civil DE7230
Safety DE5700
INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (FAHS)
20-Apr-17 20-Apr-17
100%
0 0
DE5570
INPUT/OUTPUT LISTS (DEMOLITION) (FAHS)
27-Apr-17
13-Jul-17
63
100%
0
21-Mar-17 A
26-Jul-17 A
DE5750
INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (FAHS)
27-Apr-17
10-Aug-17
86
100%
0
18-May-17 A
10-Oct-17 A
DE5880
INSTRUMENTS DATA SHEETS (FAHS)
01-May-17
08-Aug-17
81
100%
0
04-Apr-17 A
26-Dec-17 A
DE5590
INSTRUMENTS DIAGRAMS (FAHS)
04-May-17
20-Sep-17
113
100%
0
25-May-17 A
18-Mar-18 A
DE7100
INSTRUMENTS BUILDING LAYOUT (FAHS)
16-May-17
01-Aug-17
63
100%
0
15-May-17 A
25-Jul-17 A
DE5580
INSTRUMENTS INDEX (FAHS)
30-May-17
14-Aug-17
62
100%
0
31-May-17 A
19-Oct-17 A
DE5890
INPUT/OUTPUT AND ALARM & TRIP LISTS (FAHS)
04-Jun-17
03-Sep-17
74
100%
0
08-Jun-17 A
10-Dec-17 A
DE5600
INSTRUMENTS SCOPE OF WORK (FAHS)
13-Jun-17
29-Aug-17
63
100%
0
13-Jul-17 A
19-Oct-17 A
DE5900
INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (FAHS)
25-Jun-17
12-Sep-17
65
100%
0
29-Jun-17 A
19-Oct-17 A
DE5910
INSTRUMENTS MTO (FAHS)
09-Aug-17
12-Sep-17
28
100%
0
28-Sep-17 A
13-Dec-17 A
23-Mar-17
20-Sep-17
130
27
15-Mar-17 A
02-Dec-18
PROCESS PFDS (JALM)
23-Mar-17 23-Mar-17
20-Aug-17 08-Jun-17
106 62
100%
0 0
04-Apr-17 A 04-Apr-17 A
11-Mar-18 A 04-Dec-17 A
DE6850
PFD FOR FIRE WATER NETWORK (JALM)
19-Apr-17
05-Jul-17
62
100%
0
19-Apr-17 A
04-Dec-17 A
DE5100
PROCESS P&IDS (JALM)
27-Apr-17
13-Jul-17
62
100%
0
03-May-17 A
11-Mar-18 A
DE5110
PROCESS P&IDS (DEMOLITION) (JALM)
27-Apr-17
13-Jul-17
62
100%
0
03-May-17 A
02-Jan-18 A
DE5080
PROCESS LINE DESIGNATION TABLES (JALM)
04-Jun-17
20-Aug-17
62
100%
0
07-Jun-17 A
24-Jan-18 A
PIPING EQUIPMENT LOCATION PLAN (JALM)
29-Mar-17 29-Mar-17
20-Sep-17 13-Jun-17
126 62
100%
27 0
05-Apr-17 A 09-Apr-17 A
02-Dec-18 04-Mar-18 A
Instrument DE7030
Jaleha Main Process DE5090
Piping DE6900 DE5230
PIPING PLOT PLANS (JALM)
02-Apr-17
15-Jun-17
62
100%
0
05-Apr-17 A
04-Mar-18 A
DE5350
PIPING VALVE & PIPING SPECIALITY ITEMS LISTS (JALM)
21-May-17
20-Aug-17
74
100%
0
25-May-17 A
02-Nov-17 A
DE5390
PIPING MTOS (JALM)
05-Jun-17
20-Aug-17
62
100%
0
07-Jun-17 A
10-Jan-18 A
DE5400
PIPING CRITICAL LINE LIST (JALM)
14-Jun-17
31-Aug-17
64
100%
0
21-Jun-17 A
14-Sep-17 A
DE5260
PLOT PLANS (DEMOLITION) (JALM)
18-Jun-17
03-Sep-17
63
100%
0
22-Jun-17 A
18-Oct-17 A
DE5370
PIPING STRESS ANALYSIS REPORT (JALM)
04-Jul-17
07-Aug-17
28
100%
0
03-Jul-17 A
26-Feb-18 A
DE5250
PIPING G.A (JALM)
10-Jul-17
20-Sep-17
60
100%
0
08-Jul-17 A
22-Mar-18 A
DE5410
PIPING MTOS (DEMOLITION) (JALM)
12-Jul-17
15-Aug-17
28
100%
0
07-Jun-17 A
10-Jan-18 A
DE5270
PIPING G.A (DEMOLITION) (JALM)
24-Jul-17
17-Sep-17
44
100%
0
27-Jul-17 A
09-Nov-17 A
DE5340
PIPE SUPPORT LIST (JALM)
24-Jul-17
14-Sep-17
43
100%
0
27-Jul-17 A
22-Jan-18 A
DE5240
PIPING TIE-IN PACKAGES & SCHEDULES (JALM)
30-Jul-17
19-Sep-17
43
85%
27
04-Aug-17 A
02-Dec-18
DE5380
PIPING KEY PLANS (JALM)
30-Jul-17
14-Sep-17
39
100%
0
01-Aug-17 A
26-Nov-17 A
DE5360
PIPING ISOMETRICS (JALM)
20-Aug-17
20-Sep-17
27
100%
0
18-Jan-18 A
22-Feb-18 A
ELECTRICAL CALCULATIONS (JALM)
30-Mar-17 30-Mar-17
13-Sep-17 24-Jul-17
119 92
100%
0 0
14-Apr-17 A 14-Apr-17 A
26-Feb-18 A 01-Oct-17 A
DE5120
TIE-IN, CABLES & INTERCONNECTION SCHEDULES (JALM)
07-May-17
13-Sep-17
105
100%
0
04-May-17 A
25-Sep-17 A
DE5140
ELECTRICAL ADEQUACY REORTS (JALM)
14-May-17
30-Jul-17
62
100%
0
25-May-17 A
24-Sep-17 A
DE5130
SINGLE LINE DIAGRAMS (JALM)
24-May-17
09-Aug-17
62
100%
0
07-May-17 A
19-Sep-17 A
DE5430
LIGHTING LAYOUT (JALM)
15-Jun-17
31-Aug-17
62
100%
0
21-May-17 A
03-Aug-17 A
DE5450
EARTHING & CABLE ROUTING LAYOUTS (JALM)
18-Jun-17
03-Sep-17
62
100%
0
18-Jun-17 A
08-Nov-17 A
Electrical DE5420
TF
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
166
166
166
Page 22 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
ELECTRICAL MTOS (JALM)
09-Jul-17
10-Aug-17
27
100%
DRAINAGE LAYOUTS & DETAILS (JALM)
06-Jun-17 06-Jun-17
18-Sep-17 22-Aug-17
75 63
DE5190
GRADING & ROAD LAYOUTS & DETAILS (JALM)
06-Jun-17
22-Aug-17
DE5200
PLATFORMS STRUCTURAL DETAILS (JALM)
09-Jul-17
18-Sep-17
DE5210
FOUNDATIONS GA, PLANS & DETAILS (JALM)
09-Jul-17
DE5220
PIPE SUPPORT LAYOUTS & SCHEDULES (JALM)
DE5440 Civil DE7240
Page 10 of32
Act.Start / F-C Start
Act. Fin / F-C Fin
0
04-Jul-17 A
26-Feb-18 A
100%
0 0
07-Jun-17 A 07-Jun-17 A
24-Sep-18 A 24-Sep-18 A
63
100%
0
07-Jun-17 A
24-Sep-18 A
59
100%
0
08-Jul-17 A
01-May-18 A
18-Sep-17
59
100%
0
08-Jul-17 A
28-Jun-18 A
TF
09-Jul-17
18-Sep-17
59
100%
0
08-Jul-17 A
24-Sep-18 A
HAZARDOUS AREA SCHEDULES (JALM)
18-May-17 18-May-17
15-Aug-17 03-Aug-17
63 62
100%
0 0
03-May-17 A 25-May-17 A
11-Jul-18 A 22-Mar-18 A
DE5290
HSE LAYOUTS (JALM)
18-May-17
08-Aug-17
65
100%
0
25-May-17 A
11-Jul-18 A
DE5300
F&G AND PROCESS CAUSE & EFFECT CHARTS (JALM)
18-May-17
08-Aug-17
65
100%
0
15-May-17 A
17-Jun-18 A
DE5310
HSE DATA SHEETS (JALM)
18-May-17
15-Aug-17
71
100%
0
03-May-17 A
24-Jan-18 A
DE5320
HSE P&IDS (JALM)
18-May-17
06-Aug-17
63
100%
0
04-May-17 A
11-Jan-18 A
DE7170
DEMOLITION PROCESS CAUSE & EFFECT CHARTS (JALM)
29-May-17
14-Aug-17
62
100%
0
08-Jul-17 A
23-Aug-17 A
INSTRUMENTS F&G LOCATIONS & CABLE ROUTING LAYOUTS (JALM)
20-Apr-17 20-Apr-17
20-Sep-17 15-Aug-17
110 95
100%
0 0
15-Mar-17 A 22-Mar-17 A
26-Feb-18 A 25-Jan-18 A
DE5150
INPUT/OUTPUT LISTS (DEMOLITION) (JALM)
27-Apr-17
13-Jul-17
63
100%
0
15-Mar-17 A
26-Jul-17 A
DE5330
INSTRUMENTS LOCATIONS & CABLE ROUTING LAYOUTS (JALM)
27-Apr-17
10-Aug-17
86
100%
0
18-May-17 A
10-Oct-17 A
DE5460
INSTRUMENTS DATA SHEETS (JALM)
01-May-17
08-Aug-17
81
100%
0
04-Apr-17 A
21-Dec-17 A
DE5170
INSTRUMENTS DIAGRAMS (JALM)
04-May-17
20-Sep-17
113
100%
0
25-May-17 A
26-Feb-18 A
DE5160
INSTRUMENTS INDEX (JALM)
30-May-17
14-Aug-17
62
100%
0
31-May-17 A
19-Oct-17 A
DE5470
INPUT/OUTPUT AND ALARM & TRIP LISTS (JALM)
04-Jun-17
03-Sep-17
74
100%
0
08-Jun-17 A
10-Dec-17 A
DE5180
INSTRUMENTS SCOPE OF WORK (JALM)
13-Jun-17
29-Aug-17
63
100%
0
13-Jul-17 A
19-Oct-17 A
DE5480
INSTRUMENTS CABLES & JUNCTION BOXES SCHEDULES (JALM)
25-Jun-17
12-Sep-17
65
100%
0
29-Jun-17 A
19-Oct-17 A
DE5490
INSTRUMENTS MTO (JALM)
09-Aug-17
12-Sep-17
28
100%
0
28-Sep-17 A
14-Dec-17 A
01-Apr-17
27-Jul-18
507
106
03-Apr-17 A
31-Jan-19
9
01-Apr-17
27-Jul-18
507
106
03-Apr-17 A
31-Jan-19
9
01-Apr-17 13-May-17 13-May-17
27-Jul-18 27-Jul-18 19-Jul-17
507 462 56
03-Apr-17 A 28-May-17 A 28-May-17 A
27-Sep-18 A 25-Aug-18 A 10-Sep-17 A
Safety DE5280
Instrument DE7040
Procurement EQUIPMENTS
100%
0 0 0
PC1030
PREPARE VENDOR DOCUMENT REVIEW & APPROVAL
20-Jul-17
10-Sep-17
45
100%
0
12-Sep-17 A
26-Oct-17 A
PC1010
MANUFACTURING ( PROCUREMENT / MANUFAC, SHIP) - TEST SEPARATOR
11-Sep-17
27-Jul-18
320
100%
0
28-Nov-17 A
01-Aug-18 A
PC1190
DELIVERED AT AT SITE - TEST SEPARATOR - FIRST BATCH - 2 NOS
28-Jun-18
0
100%
0
23-Jul-18 A
PC1020
DELIVERED AT AT SITE - TEST SEPARATOR 2ND BATCH - 2 NOS
13-Jul-18
0
100%
0
12-Aug-18 A
PC1200
DELIVERED AT AT SITE - TEST SEPARATOR - 3RD BATCH 3NOS
Mechanical Three Phase Test Te Separator PC1000 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- TEST SEPARATOR
27-Jul-18
0
100%
0
P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL - METERING SKID
01-Jun-17 01-Jun-17
06-Apr-18 09-Aug-17
321 56
100%
0 0
12-Jul-17 A 12-Jul-17 A
27-Sep-18 A 18-Jan-18 A
PC1080
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- METERING SKID
09-Aug-17
06-Apr-18
300
100%
0
19-Jan-18 A
20-Sep-18 A
PC1090
DELIVERED AT SITE- METERING SKID
06-Apr-18
0
100%
0
01-Apr-17 01-Apr-17 01-Apr-17 01-Apr-17
30-Sep-17 30-Sep-17 30-Sep-17 13-Apr-17
186 186 186 12
BS&W Meter PC1070
100%
BID EVALUATION - TBE ISSUE TO QP
15-Apr-17
30-Apr-17
14
100%
0
21-Apr-17 A
04-May-17 A
SDPR20
TBE APPROVAL - QP
01-May-17
06-May-17
5
100%
0
05-May-17 A
09-May-17 A
SDPR30
PO ISSUE VALVES
07-May-17
08-May-17
2
100%
0
10-May-17 A
11-May-17 A
SDPR40
MANUFACURING PERIOD / SHIPMENT & PORT CLEARENACE
08-May-17
29-Sep-17
180
100%
0
14-May-17 A
31-Oct-17 A
SDPR70
DELIVERY TO SITE
30-Sep-17
0
100%
0
13-Apr-17 13-Apr-17
16-Aug-17 26-Apr-17
131 12
03-Apr-17 A 03-Apr-17 A 03-Apr-17 A 03-Apr-17 A
02-Nov-17 A 02-Nov-17 A 31-Oct-17 A 20-Apr-17 A
20-Apr-17 A 20-Apr-17 A
02-Nov-17 A 16-May-17 A
100%
SDPR010
BID EVALUATION - TBE ISSUE TO QP
27-Apr-17
17-May-17
18
100%
0
17-May-17 A
03-Jul-17 A
SDPR020
TBE APPROVAL - QP
18-May-17
23-May-17
5
100%
0
17-Jul-17 A
17-Jul-17 A
SDPR030
PO ISSUE PIPING
24-May-17
28-May-17
4
100%
0
15-Jul-17 A
17-Jul-17 A
SDPR040
MANUFACURING PERIOD & TRANSPORTATION
28-May-17
08-Aug-17
90
100%
0
18-Jul-17 A
26-Oct-17 A
SDPR050
SHIPMENT AND CLAREANCE
09-Aug-17
16-Aug-17
7
100%
0
27-Oct-17 A
02-Nov-17 A
SDPR070
DELIVERY AT SITE
16-Aug-17
0
100%
0
06-Apr-18
317
05-Jun-17
0
M 4
2017 J Jul A 5 6 7
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
31-Oct-17 A
0 0
Piping Valves
A 3
27-Sep-18 A
SDPR10
Piping and Fittings Fit / Flanges SDPR100 ENQUIRY FLOATED/ RECIEVE BIDS
M 2
17:46
25-Aug-18 A
0 0 0 0
Piping Procurment (Early (Ea Tie-in ) for all Khatiya Station BALL VALVES (1.5 inch to 10 inch) SDPR00 ENQUIRY FLOATED/ RECIEVE BIDS
F 1
29-Nov-18
02-Nov-17 A 29-Jun-17 A
13-Sep-18 A
Page 23 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule.
Page 11 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-ALL VALVES
12-Jun-17 12-Jun-17
06-Apr-18 09-Aug-17
310 48
100%
0 0
29-Jun-17 A 29-Jun-17 A
13-Sep-18 A 28-Dec-17 A
PR1000
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-ALL VALVES
09-Aug-17
06-Apr-18
300
100%
0
29-Dec-17 A
13-Sep-18 A
PR1010
DELIVERED AT SITE-ALL VALVES
06-Apr-18
0
100%
0
05-Jun-17 05-Jun-17
30-Mar-18 02-Aug-17
310 48
100%
0 0
25-Jul-17 A 25-Jul-17 A
11-Jul-18 A 21-Dec-17 A
02-Aug-17
30-Mar-18
300
100%
0
22-Dec-17 A
11-Jul-18 A
30-Mar-18
0
27-Jul-17 A 25-Dec-17 A
29-Mar-18 A 29-Mar-18 A
Ball Valves PR1020
Gate, Globe an and Check Valve PC1390 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- GGC VALVES PC1370
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- GCC VALVES
PC1380
DELIVERED AT SITE-GGC VALVES
100%
0
0 0
TF
100%
DELIVERED AT SITE-BUTTER FLY VALVES
0
100%
0
PC1600
P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- BUTTER FLY VALVES
0
100%
0
27-Jul-17 A
24-Aug-17 A
19-Jun-17 A 13-Jul-17 A 19-Jul-17 A 19-Jul-17 A
20-Dec-18 10-Dec-18 10-Dec-18 18-Jan-18 A
13 24 15
18-Jan-18 A
10-Dec-18
14
PC1560
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- ELECTRONIC INS
PC1570
DELIVERED AT SITE- ELECTRONIC INSTRUMENTS (PT/TT)
12-Jun-17 09-Aug-17 09-Aug-17 09-Aug-17
03-May-18 11-Mar-18 11-Mar-18 18-Oct-17
339 223 223 56
100%
61 50 50 0
18-Oct-17
11-Mar-18
180
95%
47
11-Mar-18
0
LEVEL GAUGES GAUGE (MAGNETIC) PC1610 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- LEVEL GAUGES (MAG
0%
0
10-Dec-18
14
0 0
24-Jul-17 A 24-Jul-17 A
10-Dec-18 12-Dec-17 A
15
100%
50 0
13-Dec-17 A
10-Dec-18
14
10-Dec-18
14
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- LEVEL GAUGES (
0
95%
47
PC1630
DELIVERED AT SITE- LEVEL GAUGES (MAGNETIC)
0
0%
0
GAUGES (PG/TG) (PG/T PC1640 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-GAUGES (PG/TG)
0 0
20-Jul-17 A 20-Jul-17 A
10-Dec-18 30-Jan-18 A
15
100%
50 0
31-Jan-18 A
10-Dec-18
14
10-Dec-18
14
PC1650
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-GAUGES (PG/TG)
0
95%
47
PC1660
DELIVERED AT SITE- GAUGES (PG/TG)
0
0%
0
0 0
24-Jul-17 A 24-Jul-17 A
10-Dec-18 15-Feb-18 A
16
100%
50 0
16-Feb-18 A
10-Dec-18
15
10-Dec-18
15
PC1680
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-LEVEL GAUGES (G
0
80%
47
PC1690
DELIVERED AT SITE- LEVEL GAUGES (GLASS TYPE)
0
0%
0
0 0
50 0
25-Jul-17 A 25-Jul-17 A
10-Dec-18 28-Dec-17 A
24
100%
29-Dec-17 A
10-Dec-18
22
10-Dec-18
22
LEVEL TRANSMITTERS TRANSM (DISPLACER) PC1700 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- LEVEL TRANSMITTERS PC1710
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-LEVEL TRANSMIT
0
80%
47
PC1720
DELIVERED AT SITE- LEVEL TRANSMITTERS (DISPLACER)
0
0%
0
LEVEL TRANSMITTERS TRANSM (RADAR) PC1730 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- LEVEL TRANSMITTER
0 0
25-Jul-17 A 25-Jul-17 A
10-Dec-18 30-Jan-18 A
13
100%
50 0 47
01-Feb-18 A
10-Dec-18
12
PC1740
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- LEVEL TRANSMIT
0
80%
PC1750
DELIVERED AT SITE- LEVEL TRANSMITTERS (RADAR)
0
FLOW TRANSMITTERS TRANSM PC1760 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- FLOW TRANSMITTERS
0%
0
10-Dec-18
12
0 0
13-Jul-17 A 13-Jul-17 A
10-Dec-18 18-Jan-18 A
10
100%
50 0
18-Jan-18 A
10-Dec-18
9
PC1770
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-FLOW TRANSMITT
0
70%
47
PC1780
DELIVERED AT SITE- FLOW TRANSMITTERS
0
0%
0
Modifcation Control Con System (Honey Well, Emerson,Yokgawa) Modifcation Control Co System (Yokgawa) PC1160 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- DCS PC1170
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DCS
PC1180
DELIVERED AT SITE- DCS (HARDWARE AND SOFTWARE)- EARLY TIE-IN WO
PC1850
DELIVERED AT SITE- DCS (HARDWARE AND SOFTWARE)-JALEHA
10-Dec-18
9
27-Jul-17 A 27-Jul-17 A 27-Jul-17 A
13-Dec-18 10-Dec-18 21-Dec-17 A
12 15
22-Dec-17 A
10-Dec-18
14
28-Jun-17 28-Jun-17 28-Jun-17
03-May-18 03-May-18 05-Sep-17
322 322 56
100%
54 50 0
05-Sep-17
03-May-18
300
65%
47
03-May-18
0
100%
0
0
0%
0
10-Dec-18
14
0 0
03-Aug-17 A 03-Aug-17 A
13-Dec-18 28-Dec-17 A
11
100%
54 0
29-Dec-17 A
13-Dec-18
11
13-Dec-18
11
Modifcation Control Co System (Honey Well) PC1790 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- DCS MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DCS
0
60%
50
PC1810
DELIVERED AT SITE- DCS (HARDWARE AND SOFTWARE)
0
0%
0
Modifcation Control Co System (Emerson) PC1820 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- DCS
0 0
10-Aug-17 A 10-Aug-17 A
27-Sep-18 A 28-Dec-17 A
29-Dec-17 A
27-Sep-18 A
100%
PC1830
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DCS
0
100%
0
PC1840
DELIVERED AT SITE- DCS (HARDWARE AND SOFTWARE)
0
100%
0
Intrumentation & Control Valves Control Valves
12-Jun-17 14-Jun-17
19-Apr-18 19-Apr-18
324 322
61 0
2017 J Jul A 5 6 7
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
20-Jan-18 A
PC1800
0 0
M 4
29-Mar-18 A
PC1620
LEVEL GAUGES GAUGE (GLASS TYPE) PC1670 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- LEVEL GAUGES (GLAS
A 3
11-Jul-18 A
PC1590
Instrumentation & Control Field Instrumentation Instrumen ELECTRONIC INSTRUMENTS I (PT/TT) PC1550 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- ELECTRONIC INSTRUM
M 2
17:46
13-Sep-18 A
0 0
Butter Fly Valves Valve - DELETED PC1580 MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- BUTTER FLY VALV
F 1
29-Nov-18
27-Sep-18 A 19-Jun-17 A 03-Aug-17 A
20-Dec-18 28-Aug-18 A
11
Page 24 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
Page 12 of32
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
PC1100
P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- CONTROL VALVES
14-Jun-17
22-Aug-17
56
100%
0
03-Aug-17 A
19-Nov-17 A
PC1110
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- CONTROL VALVE
22-Aug-17
19-Apr-18
300
100%
0
20-Nov-17 A
28-Aug-18 A
PC1120
DELIVERED AT SITE- CONTROL VALVE
19-Apr-18
0
100%
0
12-Jun-17 12-Jun-17
17-Apr-18 20-Aug-17
322 56
19-Jun-17 A 19-Jun-17 A
20-Dec-18 05-Apr-18 A
11
100%
61 0
20-Aug-17
17-Apr-18
300
80%
57
06-Apr-18 A
20-Dec-18
11
17-Apr-18
0
20-Dec-18
11
SDV / BDV Valve Valv PC1460 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- SD / BD VALVE PC1470
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- SD/ BD VALVE
PC1480
DELIVERED AT SITE- SD/ BD VALVE
0%
0
0 0
02-Aug-17 A 02-Aug-17 A
02-Aug-18 A 15-Feb-18 A
16-Feb-18 A
02-Aug-18 A
100%
PC1870
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- RESTRICTION OR
0
100%
0
PC1880
DELIVERED AT SITE- RESTRICTION ORIFICE
0
100%
0
0 0
50 0
19-Jun-17 A 19-Jun-17 A
10-Dec-18 04-Jan-18 A
10
100%
05-Jan-18 A
10-Dec-18
9
10-Dec-18
9
Pressure Relief Relie Valve PC1890 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- PRESSURE RELIEF VA MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- PRESSURE REL
0
90%
47
PC1910
DELIVERED AT SITE- PRESSURE RELIEF VALVES
0
0%
0 23-Jul-17 A 23-Jul-17 A 23-Jul-17 A
31-Jan-19 10-Dec-18 25-Jan-18 A
9 23
26-Jan-18 A
10-Dec-18
21
10-Dec-18
21
10-Jul-17 10-Jul-17 10-Jul-17
09-May-18 01-Apr-18 21-Sep-17
319 279 60
100%
106 50 0
21-Sep-17
01-Apr-18
240
50%
47
01-Apr-18
0
0%
0
19-Jul-17 19-Jul-17
22-Mar-18 27-Sep-17
258 56
69 0
25-Jul-17 A 25-Jul-17 A
27-Dec-18 29-Mar-18 A
4
100%
27-Sep-17
22-Mar-18
220
90%
64
01-Apr-18 A
27-Dec-18
4
22-Mar-18
0
0%
0
27-Dec-18
4
09-May-18 27-Sep-17
309 56
100%
106 0
25-Jul-17 A 25-Jul-17 A
31-Jan-19 22-Feb-18 A
9
P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- DELUDGE SKID
19-Jul-17 19-Jul-17
PC1050
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DELUDGE SKID
27-Sep-17
09-May-18
280
55%
99
23-Feb-18 A
31-Jan-19
0
PC1060
DELIVERED AT SITE-DELUDGE SKID -1st LOT (Khatiya Stations)
09-May-18
0
0%
0
31-Dec-18
0
PC1950
DELIVERED AT SITE-DELUDGE SKID - 2nd LOT Remaining Stations
0
0%
0
31-Jan-19
9
PC1140
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-FIRE & GAS DEV
PC1150
DELIVERED AT SITE-FIRE & GAS DEVICES
Fire Fighting Equipments Eq PC1490 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- FIRE FIGHTING EQUIP PC1500
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-FIRE FIGHTING EQ
PC1510
DELIVERED AT SITE- FIRE FIGHTING EQUIPMENTS
Deludge Skid PC1040
Bulk Material Electrical Bulks Power & Control Contro Cables PC1250 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-POWER & CONT CABLE PC1260
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-POWER & CONT C
PC1270
DELIVERED AT SITE-POWER & CONT CABLES
Electrical Bulk Material M PC1220 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-ELECTRIC BULK PC1230
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-ELECTRIC BULK
PC1240
DELIVERED AT SITE-ELECTRIC BULK
Instrumentation Instrumentation Bulk Material PC1400 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-INSTRUMENTATION BU PC1410
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-INSTRUMENTATIO
PC1420
DELIVERED AT SITE-INSTRUMENTATION BULK
Instrument Cables Cabl PC1430 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-INSTRUMENT CABLES PC1440
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-INSTRUMENT CAB
PC1450
DELIVERED AT SITE-INSTRUMENT CABLES
Piping Bulk Pipes / Fittings & Flanges PC1310 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-PIPES
A 3
M 4
2017 J Jul A 5 6 7
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
02-Aug-18 A
PC1900
Safety Fire and Gas Detectors De PC1130 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-FIRE & GAS DEVICES
M 2
17:46
28-Aug-18 A
0 0
RESTRICTION ORIFICE PC1860 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- RESTRICTION ORIFICE
F 1
29-Nov-18
29-Jun-17
27-Jan-18
217
31
30-Jul-17 A
22-Nov-18
17
09-Jul-17 09-Jul-17 09-Jul-17
15-Jan-18 15-Jan-18 17-Sep-17
198 198 56
30-Jul-17 A 30-Jul-17 A 30-Jul-17 A
22-Nov-18 22-Nov-18 06-Mar-18 A
8 8
100%
31 31 0
17-Sep-17
15-Jan-18
150
65%
29
07-Mar-18 A
22-Nov-18
8
15-Jan-18
0
0%
0
22-Nov-18
8
09-Jul-17 09-Jul-17
22-Dec-17 17-Sep-17
172 56
100%
0 0
30-Jul-17 A 30-Jul-17 A
15-Aug-18 A 06-Mar-18 A
17-Sep-17
22-Dec-17
120
100%
0
07-Mar-18 A
15-Aug-18 A
22-Dec-17
0
100%
0
24-Aug-17 24-Aug-17 24-Aug-17
27-Jan-18 17-Jan-18 06-Nov-17
161 151 60
100%
31 0 0
10-Aug-17 A 10-Aug-17 A 10-Aug-17 A
22-Nov-18 18-Aug-18 A 06-Mar-18 A
06-Nov-17
17-Jan-18
90
100%
0
06-Mar-18 A
18-Aug-18 A
15-Aug-18 A 1
17-Jan-18
0
100%
0
24-Aug-17 24-Aug-17
27-Jan-18 23-Oct-17
161 48
10-Aug-17 A 10-Aug-17 A
22-Nov-18 06-Mar-18 A
1
100%
31 0
18-Aug-18 A
23-Oct-17
27-Jan-18
120
95%
29
06-Mar-18 A
22-Nov-18
2
27-Jan-18
0
0%
0
22-Nov-18
2
29-Jun-17 29-Jun-17 29-Jun-17
25-Dec-17 25-Dec-17 27-Aug-17
182 182 48
03-Aug-17 A 13-Aug-17 A 13-Aug-17 A
20-Nov-18 27-Sep-18 A 18-Jan-18 A
19
100%
29 0 0
27-Aug-17
25-Dec-17
19-Jan-18 A
05-Jul-18 A
PC1320
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-PIPES / FITTINGS
150
100%
0
PC1990
DELIVERED AT FABRICATION FACILITY / SITE -PIPES / FITTINGS & FLANGE
0
100%
0
PC2000
DELIVERED AT FABRICATION FACILITY / SITE -PIPES / FITTINGS & FLANGE
0
100%
0
30-Jul-18 A
PC2010
DELIVERED AT FABRICATION FACILITY / SITE -PIPES / FITTINGS & FLANGE
0
100%
0
20-Sep-18 A
PC2020
DELIVERED AT FABRICATION FACILITY / SITE -PIPES / FITTINGS & FLANGE
0
100%
0
PROJECT FITTINGS FITTIN PC1920 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-PROJECT FITTINGS (Y-T
0 0
100%
0 0
30-Jul-18 A
27-Sep-18 A 03-Aug-17 A 03-Aug-17 A
27-Sep-18 A 18-Jan-18 A
Page 25 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
Page 13 of32
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
19-Jan-18 A
27-Sep-18 A
TF
PC1930
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)- (Y-TYPE STRAINE
0
100%
0
PC1940
DELIVERED AT SITE- (Y-TYPE STRAINER/CC PROBES)
0
100%
0 10-Aug-17 A 10-Aug-17 A
20-Nov-18 18-Jan-18 A
19
19-Jan-18 A
20-Nov-18
18
20-Nov-18
18
25-Dec-17 27-Aug-17
182 48
100%
29 0
27-Aug-17
25-Dec-17
150
90%
27
25-Dec-17
0
0%
0
P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)- STEEL STRUCTURE
05-Aug-17 05-Aug-17 05-Aug-17
14-Dec-17 14-Dec-17 03-Oct-17
137 137 48
100%
0 0 0
07-Aug-17 A 07-Aug-17 A 07-Aug-17 A
25-Jan-18 A 25-Jan-18 A 19-Dec-17 A
PR1040
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-STEEL STRUCTUR
03-Oct-17
14-Dec-17
90
100%
0
20-Dec-17 A
25-Jan-18 A
PR1050
DELIVERED AT SITE-STEEL STRUCURE
14-Dec-17
0
100%
0
04-May-17
21-Aug-17
91
0
04-Jun-17 A
14-Nov-17 A
PACKAGE ENQUIRY FLOATED FOR HSE WORKS
04-May-17 04-May-17
20-Jun-17 10-May-17
40 5
100%
0 0
04-Jun-17 A 04-Jun-17 A
08-Oct-17 A 10-Jun-17 A
PC1530
RECEIVE BIDS, EVALUATION, COMPANY APPROVAL
10-May-17
14-Jun-17
30
100%
0
10-Jun-17 A
03-Oct-17 A
PC1540
ISSUE PO
14-Jun-17
20-Jun-17
5
100%
0
04-Oct-17 A
08-Oct-17 A
21-Aug-17 20-Jun-17
55 5
01-Jul-17 A 01-Jul-17 A
14-Nov-17 A 05-Jul-17 A
PC1350
MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-GASKETS AND BO
PC1360
DELIVERED AT SITE-GASKETS AND BOLTS
Civil Steel Structure PR1030
Sub-Contract Packages Pac HSE Studies PC1520
PACKAGE ENQUIRY FLOATED FOR NDT WORKS
100%
0 0
PS1010
RECEIVE BIDS, EVALUATION, COMPANY APPROVAL
21-Jun-17
15-Aug-17
45
100%
0
06-Jul-17 A
12-Nov-17 A
PS1020
ISSUE PO NDT
16-Aug-17
21-Aug-17
5
100%
0
13-Nov-17 A
14-Nov-17 A
Pre-construction Prepartation P Mobilization Plan
19-Feb-17
02-Oct-17
187
0
16-Mar-17 A
21-Jan-18 A
23-May-17
02-Oct-17
107
0
10-Aug-17 A
21-Jan-18 A
A1390
MANPOWER MOBILIZATION FOR TCF SET-UP
23-May-17
24-Aug-17
78
100%
0
10-Aug-17 A
09-Jan-18 A
A1400
EQUIPMENT MOBILIZATION FOR TCF SET-UP
23-May-17
24-Aug-17
78
100%
0
10-Sep-17 A
09-Jan-18 A
A1410
MANPOWER MOBILIZATION FOR PLANT CONSTRUCTION
24-Jul-17
02-Oct-17
57
100%
0
15-Oct-17 A
21-Jan-18 A
A1420
EQUIPMENT MOBILIZATION FOR PLANT CONSTRUCTION
24-Jul-17
02-Oct-17
57
100%
0
05-Oct-17 A
21-Jan-18 A
19-Feb-17
03-Aug-17
140
0
16-Mar-17 A
27-Sep-17 A
Documents Prepatation Prep A1350
PLANNING PACKAGE APPROVED BY QP
19-Feb-17
22-May-17
80
100%
0
16-Mar-17 A
27-Sep-17 A
A1360
H&S PLAN APPROVED BY QP
23-May-17
03-Aug-17
60
100%
0
27-Mar-17 A
10-Aug-17 A
A1370
QA/QC PLAN APPROVED BY QP
23-May-17
03-Aug-17
60
100%
0
25-Mar-17 A
04-Jul-17 A
A1380
CEMP APPROVED BY QP
23-May-17
03-Aug-17
60
100%
0
16-Apr-17 A
27-Aug-17 A
23-May-17
24-Aug-17
78
0
02-Sep-17 A
11-Jan-18 A
23-May-17
24-Aug-17
78
0
02-Sep-17 A
11-Jan-18 A
03-Jun-17
24-Dec-18
601
267
09-Jun-17 A
01-Jul-19
03-Jun-17
23-Oct-17
116
0
09-Jun-17 A
18-Jan-18 A
03-Jun-17 03-Jun-17
23-Oct-17 27-Jul-17
116 45
100%
0 0
09-Jun-17 A 09-Jun-17 A
18-Jan-18 A 11-Jan-18 A 30-Dec-17 A
TCF Set-up A1430
TCF SET-UP
CONSTRUCTION WORKS Early Tie-in (3 Degassing De Station) Welder Qualification Qualifica (Shutdown Tie-in ) for KM /KN/KS SDCN110 METHOD STATEMENTS / WPS / PQR
100%
SDCN90
WELDER QUALIFICATION
17-Aug-17
25-Sep-17
30
100%
0
28-Oct-17 A
SDCN100
SPOOL FABRICATION
02-Sep-17
16-Oct-17
35
100%
0
19-Dec-17 A
SDCN120
READY FOR SHUTDOWN
23-Oct-17
0
100%
0
21-Nov-18
325
117
25-Dec-17 A
10-Mar-19
62
29-Mar-18 22-Mar-18 11-Mar-18 11-Mar-18
29 22 12 12
95%
43 14 10 10
06-Feb-18 A 06-Feb-18 A 16-Aug-18 A 16-Aug-18 A
13-Dec-18 10-Nov-18 05-Nov-18 05-Nov-18
9 33 0 0
METERING SKID SK F250 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFE
19-Mar-18 19-Mar-18
22-Mar-18 22-Mar-18
4 4
100%
0 0
19-Jun-18 A 19-Jun-18 A
26-Aug-18 A 26-Aug-18 A
PSV F240
FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSF
15-Mar-18 15-Mar-18
18-Mar-18 18-Mar-18
3 3
95%
10 10
06-Feb-18 A 06-Feb-18 A
05-Nov-18 05-Nov-18
21 21
PIPE SUPPORT F230 FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATI
12-Mar-18 12-Mar-18
14-Mar-18 14-Mar-18
3 3
98%
14 14
06-Feb-18 A 06-Feb-18 A
10-Nov-18 10-Nov-18
33 3
0
100%
0
02-Sep-18 A
16-Sep-18 A
25-Feb-18 25-Feb-18 25-Feb-18
29-Mar-18 29-Mar-18 29-Mar-18
29 29 29
27-Sep-18 A 27-Sep-18 A 08-Oct-18 A
13-Dec-18 13-Dec-18 03-Dec-18
9 0 0
04-Dec-18
13-Dec-18
0
FABRICATION OF INSTRUMENT STANCHION SUPPORTS
0%
43 43 34
F320-2
FBE PIPING BULK DELIVER AT SITE
0
0%
9
F290-00
PIPE DELIVER AT KUWAIT
0
100%
0
REMAINING PIPING PI (NON - FBE)
0
33
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
18-Jan-18 A
25-Feb-18 26-Feb-18 26-Feb-18 26-Feb-18
F260-1
2017 J Jul A 5 6 7
30-Dec-17 A
07-Nov-17
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F290 PIPING FABRICATION & FBE COATING AT KUWAIT
M 4
23
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F220 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR
KAHS
A 3
25-Jan-18 A
15-Jun-17 15-Jun-17
NDT PS1000
M 2
17:46
27-Sep-18 A
29-Jun-17 29-Jun-17
Gaskets and Bolts Bo PC1340 P.O ISSUANCE (MR, INQUIRY, BIDS, QP APPROVAL)-GASKETS AND BOLTS
F 1
29-Nov-18
27-Sep-18 A 27-Sep-18 A
02-Dec-18
19
Page 26 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
Page 14 of32
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
F290-1
COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATING
0
0%
26
21-Oct-18 A
24-Nov-18
3
F320-1
FABRICATION SPOOLS DELIVER TO SITE
0
0%
13
18-Nov-18
02-Dec-18
19
F290-4
PIPE DELIVER AT FAB FACILITY
0
100%
0
19-Nov-18 19-Nov-18 19-Nov-18 15-Jan-18
323 269 269 5
25-Dec-17 A 25-Dec-17 A 10-Feb-18 A 10-Feb-18 A
14-Jan-19 14-Jan-19 14-Jan-19 31-May-18 A
10 6 6
GRADING
100%
70 70 70 0
A1770
ROADSND PAVING(INCLUDING MODIFICATIONS)
10-Oct-18
25-Oct-18
14
0%
13
31-Dec-18
14-Jan-19
6
A1790
DRAINAGE PIPE CULVERTS
27-Oct-18
11-Nov-18
14
0%
20
08-Dec-18
30-Dec-18
5
A1800
ROAD SAFETY CRASH BARRIERS AND BOLLARD
27-Oct-18
29-Oct-18
3
0%
13
31-Dec-18
14-Jan-19
6
A1780
UTILITY ROAD CROSSINGS
27-Oct-18
19-Nov-18
21
0%
26
11-Dec-18
09-Jan-19
5
A1780-2
CABLE TRENCHES
0
35%
25
24-Sep-18 A
22-Nov-18
2
A1710-1
PROTECTION OF UNDERGROUND CABLES
0
90%
25
14-Sep-18 A
22-Nov-18
5
A1715-6
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL
0
98%
8
06-Aug-18 A
03-Nov-18
2
A1800-1
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
0
0%
13
30-Dec-18
13-Jan-19
7
10-Feb-18 A 10-Feb-18 A
08-Aug-18 A 01-Mar-18 A
07-Apr-18 A
12-Apr-18 A
TEST SEPERATOR SEPERAT A1715 EXCAVATION FOR THE MAIN FOUNDATIONS
10-Jan-18 10-Jan-18
19-Feb-18 17-Jan-18
35 7
100%
0 0
18-Jan-18
19-Feb-18
28
100%
0
A1720
FOUNDATION WORK (STEEL FIXING)
A1720-1
FOUNDATION WORK (CONCRETE)
0
100%
0
07-Apr-18 A
26-Apr-18 A
A1720-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
17-May-18 A
08-Aug-18 A
TEST SEPERAT SEPERATOR PLATFORM A1715-1 EXCAVATION FOR THE MAIN FOUNDATIONS
0 0
100%
0 0
10-Feb-18 A 10-Feb-18 A
08-Aug-18 A 01-Mar-18 A
A1720-3
FOUNDATION WORK (STEEL FIXING)
0
100%
0
07-Apr-18 A
12-Apr-18 A
A1720-4
FOUNDATION WORK (CONCRETE)
0
100%
0
07-Apr-18 A
26-Apr-18 A
A1720-5
CURING / WATERPROOFING / BACK FILLING
0
METERING SKID SK A1760 FOUNDATION WORK (CONCRETE)
17-Mar-18 17-Mar-18
24-Mar-18 24-Mar-18
100%
0
17-May-18 A
08-Aug-18 A
7 7
100%
0 0
10-Feb-18 A 18-Mar-18 A
08-Aug-18 A 24-May-18 A 24-Mar-18 A
A1715-2
EXCAVATION
0
100%
0
10-Feb-18 A
A1760-1
FOUNDATION WORK (STEEL FIXING)
0
100%
0
22-Mar-18 A
12-Apr-18 A
A1760-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
15-May-18 A
08-Aug-18 A
21 21
100%
0 0
25-Dec-17 A 25-Dec-17 A
25-Oct-18 A 08-Aug-18 A
PIPE SUPPORT A1740 FOUNDATION WORK (STEEL FIXING)
20-Feb-18 20-Feb-18
15-Mar-18 15-Mar-18
A1715-3
EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS
0
100%
0
25-Dec-17 A
19-Jul-18 A
A1740-1
FOUNDATION WORK (CONCRETE)
0
100%
0
25-Dec-17 A
14-Aug-18 A
A1740-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
25-Dec-17 A
25-Oct-18 A
EXCAVATION (INCLUDING AREA LIGHTING POLES)
0 0
100%
0 0
05-Mar-18 A 05-Mar-18 A
06-Aug-18 A 31-May-18 A
A1760-5
FOUNDATION WORK (STEEL FIXING)
0
100%
0
25-Mar-18 A
17-May-18 A
A1760-3
FOUNDATION WORK (CONCRETE)
0
100%
0
18-Mar-18 A
21-Jun-18 A
A1760-4
CURING / WATERPROOFING / BACK FILLING
0
100%
0
18-Mar-18 A
06-Aug-18 A
27-Sep-18 A 27-Sep-18 A 27-Sep-18 A
29-Nov-18 21-Nov-18 21-Nov-18
21 10 0 10
PSV A1715-4
20-Aug-18 20-Aug-18 20-Aug-18
08-Sep-18 04-Sep-18 27-Aug-18
17 14 7
10%
31 24 24
02-Sep-18
04-Sep-18
3
0%
9
12-Nov-18
21-Nov-18
METERING SKID SK A2490 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W
23-Aug-18 23-Aug-18
28-Aug-18 28-Aug-18
5 5
100%
0 0
13-Oct-18 A 13-Oct-18 A
23-Oct-18 A 23-Oct-18 A
PSV A2500
27-Aug-18 27-Aug-18
01-Sep-18 01-Sep-18
5 5
0%
19 19
17-Oct-18 A 17-Oct-18 A
15-Nov-18 15-Nov-18
21 21
05-Sep-18 05-Sep-18
08-Sep-18 08-Sep-18
3 3
0%
29 29
10-Oct-18 A 10-Oct-18 A
27-Nov-18 27-Nov-18
21 21
0 0
0%
5 5
25-Nov-18 25-Nov-18
29-Nov-18 29-Nov-18
21 21
100%
0 0
09-Aug-18 A 09-Aug-18 A
09-Aug-18 A 09-Aug-18 A
31-Dec-17 A 31-Dec-17 A 31-Dec-17 A
09-Jan-19 17-Feb-18 A 31-Dec-17 A
31-Dec-17 A
05-Jan-18 A
Structural Steel TEST SEPERATOR SEPERAT A2480 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2510
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
INSTALLATION OF PSV VALVES ACCESS PLATFORMS
PIPE SUPPORT A2520 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS FIELD INSTRUMENT INSTRUM A2520-1 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2815
INSTALLATION OF NEW TEST SEPARATOR
Piping EARLY SHUTDOWN SHUTDO WORKS - Pre Shutdown and Plant Shutdown Tie-in A3061 MOBILIZATION OF OF TEAM APPLY PTW A3071
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
02-Aug-18 02-Aug-18
19-Aug-18 19-Aug-18
15 15
07-Nov-17 07-Nov-17 07-Nov-17
17-Sep-18 22-Dec-17 07-Nov-17
269 38 1
100%
22 0 0
08-Nov-17
30-Nov-17
20
100%
0
M 2
A 3
M 4
2017 J Jul A 5 6 7
S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
27-Sep-18 A
07-Nov-17 10-Jan-18 10-Jan-18 10-Jan-18
INSTALLATION Civil Works COMMON A1710
F 1
29-Nov-18
14
Page 27 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule.
Page 15 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
A3081
PIPING TIE-IN / NDT
06-Dec-17
20-Dec-17
12
100%
0
09-Feb-18 A
14-Feb-18 A
A3091
TIE-IN COMPLETE / REMOVE SCAFFOLD
21-Dec-17
22-Dec-17
2
100%
0
06-Feb-18 A
17-Feb-18 A
09-Aug-18 09-Aug-18
17-Sep-18 01-Sep-18
34 20
0%
22 18
16-Dec-18 16-Dec-18
09-Jan-19 05-Jan-19
4 0
STATION PIPING PIPIN A3020 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT A3030
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
20-Aug-18
26-Aug-18
6
0%
4
06-Jan-19
09-Jan-19
4
A3040
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
02-Sep-18
05-Sep-18
4
0%
12
24-Dec-18
06-Jan-19
3
A3050
TIE-IN
06-Sep-18
17-Sep-18
10
0%
4
06-Jan-19
09-Jan-19
0
A3020-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
9
24-Dec-18
02-Jan-19
0
A3051-1
REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV
0
0%
3
07-Jan-19
09-Jan-19
3
232 14
0%
52 7
08-Nov-18 22-Dec-18
07-Jan-19 29-Dec-18
5 9
CABLE GLANDING AND TERMINATION
16-Jan-18 16-Jan-18
13-Oct-18 31-Jan-18
A3460
U/G CABLE LAYING
01-Feb-18
08-Feb-18
7
0%
5
29-Nov-18
04-Dec-18
5
A3470
CABLE TRAY INSTALLATION
28-Aug-18
12-Sep-18
14
0%
8
22-Nov-18
01-Dec-18
0
A3480
ELECTRICAL EQUIPMENTS INSTALLATION
13-Sep-18
20-Sep-18
7
0%
10
09-Dec-18
19-Dec-18
5
A3490
CABLE LAYING
22-Sep-18
29-Sep-18
7
0%
8
02-Dec-18
10-Dec-18
5
A3500
LIGHTING FIXTURE AND DB INSTALLATION
22-Sep-18
29-Sep-18
7
0%
8
16-Dec-18
24-Dec-18
5
A3510
ELECTRICAL TIE-INS
30-Sep-18
07-Oct-18
7
0%
2
03-Jan-19
05-Jan-19
5
A3520
ENERGIZATION
08-Oct-18
13-Oct-18
5
0%
3
05-Jan-19
07-Jan-19
5
A3460-1
BACK FILLING OF CABLE TRENCH
0
0%
9
02-Dec-18
11-Dec-18
5
A3510-1
HOOK UP
0
0%
4
25-Dec-18
29-Dec-18
5
A3530
EARTH PIT DRILLING
0
Electrical A3450
Instrument & Control Co A4090 DCS MODIFICATION IN CONTROL ROOM BY VENDOR
0%
4
08-Nov-18
12-Nov-18
0
20-Aug-18 20-Aug-18
17-Nov-18 02-Sep-18
77 12
0%
49 10
13-Nov-18 25-Dec-18
08-Jan-19 05-Jan-19
0 0
A4050
CABLE TRAY AND SUPPORTS INSTALLATION
01-Sep-18
16-Sep-18
14
0%
17
13-Nov-18
02-Dec-18
0
A4060
INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING
17-Sep-18
24-Sep-18
7
0%
4
05-Jan-19
08-Jan-19
0
A4070
INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, RELIEF VALVE & CONT
25-Sep-18
02-Oct-18
7
0%
6
20-Dec-18
26-Dec-18
0
A4080
SS TUBING AND LEAK TEST
03-Oct-18
08-Oct-18
5
0%
4
01-Jan-19
05-Jan-19
0
A5300
INSTALLATION OF DELUGE
09-Oct-18
16-Oct-18
7
0%
7
01-Jan-19
08-Jan-19
0
A4640
JB SUPPORT INSTALLATION
21-Oct-18
23-Oct-18
3
0%
4
02-Dec-18
05-Dec-18
0
A4740
JB INSTALLATION
14-Nov-18
17-Nov-18
3
0%
3
04-Dec-18
06-Dec-18
0
A4090-2
INSTALLATION OF INSTRUMENT VALVE
0
0%
3
23-Dec-18
25-Dec-18
8
A4080-2
FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)
0
0%
7
16-Dec-18
23-Dec-18
9
A4090-1
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
2
25-Dec-18
26-Dec-18
7
A4080-1
INSTRUMENT CABLE LAYING
0
0%
17
05-Dec-18
24-Dec-18
0
A4080-11
CABLE GLANDS AND TERMINATION (ALONG JBs)
0
0%
10
24-Dec-18
03-Jan-19
0
A4080-21
CABLE GLANDS AND TERMINATION (ALONG INSTRUMENTS)
0
0%
5
20-Dec-18
25-Dec-18
9
F&G CABLE INSTALLATION
0 0
0%
33 9
28-Nov-18 05-Dec-18
05-Jan-19 15-Dec-18
7 25
A5920
F&G SUPPORTS INSTALLATION
0
0%
4
28-Nov-18
02-Dec-18
30
A5930
F&G DEVICES INSTALLATION
0
0%
5
11-Dec-18
16-Dec-18
24
A5940
F&G JB SUPPORT INSTALLATION
0
0%
2
05-Dec-18
06-Dec-18
32
A5950
F&G JB INSTALLATION
0
0%
3
06-Dec-18
09-Dec-18
30
A5960
F&G CABLE GLANDING AND TERMINATION
0
0%
5
20-Dec-18
25-Dec-18
9
A5970
F&G LOOP PREPARATION
0
0%
3
25-Dec-18
27-Dec-18
9
A5980
F&G LOOP TESTING
0
0%
5
31-Dec-18
05-Jan-19
7
15-Dec-18 15-Dec-18
06-Jan-19 27-Dec-18
4 4
F&G System A5910
Painting & Fireproofing Firep A4360 STRUCTURAL STEEL PAINTING AND TOUCH-UP
28-Aug-18 28-Aug-18
13-Sep-18 04-Sep-18
15 7
0%
20 12
A4380
FIREPROOFING FOR STRUCTURAL STEEL
05-Sep-18
12-Sep-18
7
0%
16
19-Dec-18
06-Jan-19
4
A4370
PIPING PAINTING AND TOUCH-UP
06-Sep-18
13-Sep-18
7
0%
4
24-Dec-18
27-Dec-18
4
06-Sep-18 06-Sep-18
25-Oct-18 09-Sep-18
43 3
0%
73 3
09-Sep-18 A 06-Jan-19
17-Jan-19 08-Jan-19
1 0
Pre-commisionin Pre-commisioning A3051 INST LOOP AND FUNCTIONAL TEST A4610
PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING
02-Oct-18
09-Oct-18
7
17%
58
09-Sep-18 A
31-Dec-18
10
A4650
DELUGE SKID FUNCTIONAL TESTING
02-Oct-18
25-Oct-18
21
0%
5
09-Jan-19
14-Jan-19
4
A4620
ELECTRICAL LIGHITING TEST
06-Oct-18
08-Oct-18
3
0%
5
08-Jan-19
13-Jan-19
0
A4630
PUNCHLIST
17-Oct-18
20-Oct-18
3
0%
4
14-Jan-19
17-Jan-19
0
A4620-1
LEAK TEST FOR PIPING AND SEPARATOR
0
0%
5
08-Jan-19
13-Jan-19
0
8
17-Jan-19
26-Jan-19
0
Commissioning
01-Nov-18
09-Nov-18
7
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 28 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Page 16 of32 Act. Fin / F-C Fin
TF
A5010
START OF PRODUCTION
01-Nov-18
3
0%
0
17-Jan-19
A5020
COMMISSIONING AND STARTUP
01-Nov-18
04-Nov-18
3
0%
4
17-Jan-19
21-Jan-19
A5030
PERFORMANCE TESTS
04-Nov-18
09-Nov-18
7
0%
4
22-Jan-19
26-Jan-19
0
03-Nov-18 03-Nov-18
21-Nov-18 06-Nov-18
16 3
17-Jan-19 17-Jan-19
10-Mar-19 20-Jan-19
62 67
0%
DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)
06-Nov-18
08-Nov-18
2
0%
2
27-Jan-19
28-Jan-19
62
DM1100
APPLY ANTI RUST TO FOUNDATION BOTLS
08-Nov-18
10-Nov-18
1
0%
3
28-Jan-19
30-Jan-19
80
DM1090
COLD CUTTING INLET AND OUTLET PIPING REMOVAL
10-Nov-18
13-Nov-18
3
0%
21
28-Jan-19
20-Feb-19
62
DM1110
UNBOLD & REMOVE EXISTING SEPARATOR
13-Nov-18
15-Nov-18
2
0%
4
20-Feb-19
24-Feb-19
62
DM1120
REMOVE CONCRETE FOUNDATION / GRADE THE AREA
15-Nov-18
21-Nov-18
5
0%
13
24-Feb-19
10-Mar-19
62
DM1130
DEMOLITION WORKS COMPLETE
0%
21-Nov-18
0
10-Mar-19
62
03-Oct-17
18-Dec-18
378
120
10-Dec-17 A
13-Mar-19
59
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F110 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR
24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18
11-Mar-18 25-Feb-18 10-Feb-18 10-Feb-18
40 28 15 15
90%
44 17 17 17
09-May-18 A 09-May-18 A 19-Sep-18 A 19-Sep-18 A
15-Dec-18 13-Nov-18 13-Nov-18 13-Nov-18
33 29 3 3
METERING SKID SK F140 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFE
20-Feb-18 20-Feb-18
25-Feb-18 25-Feb-18
5 5
100%
0 0
28-May-18 A 28-May-18 A
16-Aug-18 A 16-Aug-18 A
PSV F130
15-Feb-18 15-Feb-18
19-Feb-18 19-Feb-18
4 4
100%
0 0
17-May-18 A 17-May-18 A
21-Aug-18 A 21-Aug-18 A
11-Feb-18 11-Feb-18
14-Feb-18 14-Feb-18
4 4
99%
17 17
09-May-18 A 09-May-18 A
13-Nov-18 13-Nov-18
0
100%
0
15-Aug-18 A
16-Sep-18 A
0%
44 44 34
27-Sep-18 A 27-Sep-18 A 08-Oct-18 A
15-Dec-18 15-Dec-18 03-Dec-18
33 33 43
01-Dec-18
15-Dec-18
12
FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TO SITE
PIPE SUPPORT F120 COMPLETE FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR F120-1
FABRICATION OF INSTRUMENT STANCHION SUPPORTS
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F180 PIPING FABRICATION & FBE COATING AT KUWAIT F210
FBE PIPING BULK DELIVER AT SITE
F180-2
PIPE DELIVER AT KUWAIT
FABRICATION SPOOLS DELIVER TO SITE
F180-3
PIPE DELIVER AT FAB FACILITY
INSTALLATION Civil Works COMMOMN A1440
11-Mar-18 11-Mar-18 24-Feb-18
39 39 26
22-Feb-18
11-Mar-18
15
0%
13
0
100%
0
0 0
0%
37 33
27-Sep-18 A 27-Oct-18
08-Dec-18 03-Dec-18
3 3
0
0%
13
24-Nov-18
08-Dec-18
3
0
100%
0
100%
72 72 72 0
10-Dec-17 A 10-Dec-17 A 10-Feb-18 A 10-Feb-18 A
GRADING
03-Oct-17 03-Oct-17 03-Oct-17 03-Oct-17
18-Dec-18 06-Oct-18 06-Oct-18 26-Oct-17
378 315 315 21
16-Jan-19 16-Jan-19 16-Jan-19 31-May-18 A
11 6 6 9
CABLE TRENCHES AND UTILITY ROAD CROSSINGS
28-Oct-17
20-Nov-17
21
35%
24
25-Aug-18 A
21-Nov-18
DRAINAGE PIPE CULVERTS
12-Sep-18
27-Sep-18
14
100%
0
30-Sep-18 A
16-Oct-18 A
A1530
ROAD SAFETY CRASH BARRIERS AND BOLLARD
12-Sep-18
06-Oct-18
21
0%
13
02-Jan-19
16-Jan-19
6
A1500
ROADS AND PAVING(INCLUDING MODIFICATIONS)
12-Sep-18
27-Sep-18
14
0%
13
02-Jan-19
16-Jan-19
6
A1440-1
PROTECTION OF UNDERGROUND CABLES
0
90%
24
05-Sep-18 A
21-Nov-18
13
A1445-6
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL
0
90%
20
14-Aug-18 A
17-Nov-18
13
A1530-1
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
0
0%
13
02-Jan-19
16-Jan-19
6
09-Feb-18 A 09-Feb-18 A
11-Aug-18 A 29-Mar-18 A
01-Apr-18 A
12-Apr-18 A
28-Nov-17 26-Oct-17
38 10
100%
0 0
28-Oct-17
28-Nov-17
28
100%
0
A1450
FOUNDATION WORK (STEEL FIXING)
A1450-1
FOUNDATION WORK (CONCRETE)
0
100%
0
01-Apr-18 A
26-Apr-18 A
A1450-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
24-May-18 A
11-Aug-18 A
TEST SEPERAT SEPERATOR PLATFORM A1445-1 EXCAVATION FOR THE MAIN FOUNDATIONS
0 0
100%
0 0
09-Feb-18 A 09-Feb-18 A
11-Aug-18 A 29-Mar-18 A
01-Apr-18 A
16-Jul-18 A
A1450-3
FOUNDATION WORK (STEEL FIXING)
0
100%
0
A1450-4
FOUNDATION WORK (CONCRETE)
0
100%
0
01-Apr-18 A
26-Jul-18 A
A1450-5
CURING / WATERPROOFING / BACK FILLING
0
100%
0
27-May-18 A
11-Aug-18 A
7 7
100%
0 0
06-Mar-18 A 01-Apr-18 A
11-Aug-18 A 12-Apr-18 A
METERING SKID SK A1490 FOUNDATION WORK (STEEL FIXING)
25-Dec-17 25-Dec-17
01-Jan-18 01-Jan-18
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
27-Sep-18 A
A1520
16-Oct-17 16-Oct-17
2017 J Jul A 5 6 7
27-Sep-18 A
A1510
TEST SEPERATOR SEPERAT A1445 EXCAVATION FOR THE MAIN FOUNDATIONS
M 4
29 0
25-Jan-18 25-Jan-18 25-Jan-18
REMAINING PIPING PI ( NON FBE) F180-1 COMPLETE PIPING FABRICATION . HYDROTEST/ PAINTING & COATING F210-1
0
A 3
0
DM1080
KAHN
M 2
17:46
0
45 3
Demolition Works Work DM1070 WORK PERMIT APPROVED FOR DEMOLITION
F 1
29-Nov-18
A1445-2
EXCAVATION
0
100%
0
06-Mar-18 A
29-Mar-18 A
A1490-1
FOUNDATION WORK (CONCRETE)
0
100%
0
01-Apr-18 A
26-Apr-18 A
A1490-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
28-May-18 A
11-Aug-18 A
Page 29 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
PIPE SUPPORT A1470 FOUNDATION WORK (STEEL FIXING)
U3963- Updated Revised Baseline Schedule.
Page 17 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
29-Nov-17 29-Nov-17
24-Dec-17 24-Dec-17
21 21
100%
0 0
10-Dec-17 A 10-Dec-17 A
23-Aug-18 A 18-Aug-18 A
TF
A1445-3
EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS
0
100%
0
22-Mar-18 A
06-Aug-18 A
A1470-1
FOUNDATION WORK (CONCRETE)
0
100%
0
10-Dec-17 A
18-Aug-18 A
A1470-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
10-Dec-17 A
23-Aug-18 A
EXCAVATION (INCLUDING AREA LIGHTING POLES)
0 0
100%
0 0
24-Mar-18 A 24-Mar-18 A
11-Aug-18 A 05-Jul-18 A
A1490-3
FOUNDATION WORK (STEEL FIXING)
0
100%
0
15-Apr-18 A
08-Aug-18 A
A1490-5
FOUNDATION WORK (CONCRETE)
0
100%
0
22-Apr-18 A
08-Aug-18 A
A1490-6
CURING / WATERPROOFING / BACK FILLING
0
100%
0
04-Jun-18 A
11-Aug-18 A
02-Oct-18 A 02-Oct-18 A 02-Oct-18 A
18-Dec-18 03-Dec-18 03-Dec-18
12 15 3
PSV A1445-4
Structural Steel TEST SEPERATOR SEPERAT A2360 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2400
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
16-Jul-18 16-Jul-18 16-Jul-18
04-Aug-18 04-Aug-18 23-Jul-18
17 17 7
15%
47 34 34
01-Aug-18
04-Aug-18
3
0%
17
14-Nov-18
03-Dec-18
15
0 0
15%
37 37
04-Oct-18 A 04-Oct-18 A
06-Dec-18 06-Dec-18
3 3
METERING SKID SK A2360-1 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W PSV A2380
INSTALLATION OF PSV VALVES ACCESS PLATFORMS
PIPE SUPPORT A2370 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS
23-Jul-18 23-Jul-18
28-Jul-18 28-Jul-18
5 5
0%
37 37
10-Oct-18 A 10-Oct-18 A
06-Dec-18 06-Dec-18
22 22
19-Jul-18 19-Jul-18
24-Jul-18 24-Jul-18
5 5
0%
47 47
11-Oct-18 A 11-Oct-18 A
18-Dec-18 18-Dec-18
0 0
0 0
0%
4 4
15-Dec-18 15-Dec-18
18-Dec-18 18-Dec-18
3 3
100%
0 0
05-Sep-18 A 05-Sep-18 A
06-Sep-18 A 06-Sep-18 A
31-Dec-17 A 31-Dec-17 A 31-Dec-17 A
06-Jan-19 17-Feb-18 A 31-Dec-17 A
FIELD INSTRUMENT INSTRUM A2370-1 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2775
INSTALLATION OF NEW TEST SEPARATOR
28-Jun-18 28-Jun-18
15-Jul-18 15-Jul-18
15 15
07-Jul-18
21-Aug-18
40 0 0
100%
24 0 0
A5560
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
0
100%
0
31-Dec-17 A
05-Jan-18 A
A5570
PIPING TIE-IN / NDT
0
100%
0
09-Feb-18 A
14-Feb-18 A
A5580
TIE-IN COMPLETE / REMOVE SCAFFOLD
0
Piping EARLY SHUTDOWN SHUTDO WORKS - Pre Shutdown and Plant Shutdown Tie-in A5550 MOBILIZATION OF OF TEAM APPLY PTW
PIPING -REMAINING -REMA A2920 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT
100%
0
06-Feb-18 A
17-Feb-18 A
07-Jul-18 07-Jul-18
21-Aug-18 09-Aug-18
40 30
0%
24 17
10-Dec-18 10-Dec-18
06-Jan-19 29-Dec-18
5 0
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
11-Aug-18
13-Aug-18
3
0%
7
26-Dec-18
02-Jan-19
8
A2930
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
14-Aug-18
19-Aug-18
5
0%
4
02-Jan-19
06-Jan-19
0
A2950
TIE-IN
14-Aug-18
21-Aug-18
7
0%
4
02-Jan-19
06-Jan-19
0
A2920-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
8
19-Dec-18
27-Dec-18
0
A2951-1
REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV
0
0%
3
03-Jan-19
06-Jan-19
4
25-Aug-18 A 18-Dec-18
12-Jan-19 31-Dec-18
3 6
CABLE GLANDING AND TERMINATION
30-Jun-18 30-Jun-18
08-Sep-18 15-Jul-18
61 14
0%
68 12
A3280
U/G CABLE LAYING
16-Jul-18
23-Jul-18
7
0%
13
06-Dec-18
20-Dec-18
3
A3290
CABLE TRAY INSTALLATION
24-Jul-18
08-Aug-18
14
0%
8
06-Dec-18
15-Dec-18
3
A3300
ELECTRICAL EQUIPMENTS INSTALLATION
09-Aug-18
16-Aug-18
7
0%
12
18-Dec-18
31-Dec-18
3
A3310
CABLE LAYING
18-Aug-18
25-Aug-18
7
0%
17
09-Dec-18
27-Dec-18
3
A3320
LIGHTING FIXTURE AND DB INSTALLATION
18-Aug-18
25-Aug-18
7
0%
6
25-Dec-18
31-Dec-18
3
A3330
ELECTRICAL TIE-INS
26-Aug-18
02-Sep-18
7
0%
5
05-Jan-19
09-Jan-19
3
A3340
ENERGIZATION
03-Sep-18
08-Sep-18
5
0%
3
09-Jan-19
12-Jan-19
3
A3280-2
BACK FILLING OF CABLE TRENCH
0
0%
13
09-Dec-18
23-Dec-18
17
A3310-1
HOOK UP
0
0%
5
31-Dec-18
05-Jan-19
3
A5990
CABLE TRENCHES
0
25%
24
25-Aug-18 A
21-Nov-18
9
A6000
EARTH PIT DRILLING
0
0%
4
13-Nov-18
17-Nov-18
5
22-Nov-18 22-Nov-18
07-Jan-19 12-Dec-18
7 3
Instrument & Control Co A3950 CABLE TRAY AND SUPPORTS INSTALLATION
28-Jul-18 28-Jul-18
18-Dec-18 12-Aug-18
124 14
0%
40 18
M 2
A 3
M 4
2017 J Jul A 5 6 7
S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
20
A2940
Electrical A3270
F 1
29-Nov-18
A3960
INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING
13-Aug-18
20-Aug-18
7
0%
4
02-Jan-19
06-Jan-19
3
A3990
DCS MODIFICATION IN CONTROL ROOM BY VENDOR
14-Aug-18
20-Aug-18
6
0%
9
29-Dec-18
07-Jan-19
3
A3970
INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, PRV & CONTROL VALV
21-Aug-18
28-Aug-18
7
0%
7
26-Dec-18
02-Jan-19
3
A3980
INSTRUMENT CABLE LAYING
29-Aug-18
03-Sep-18
5
0%
18
11-Dec-18
31-Dec-18
3
A4860
INSTALLATION OF DELUGE
04-Sep-18
11-Sep-18
7
0%
4
01-Jan-19
05-Jan-19
9
Page 30 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Page 18 of32
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
A4870
JB INSTALLATION
27-Sep-18
30-Sep-18
3
0%
3
11-Dec-18
13-Dec-18
3
A4790
JB SUPPORT INSTALLATION
16-Dec-18
18-Dec-18
3
0%
3
09-Dec-18
11-Dec-18
3
A3980-2
SS TUBE AND LEAK TEST
0
0%
4
30-Dec-18
02-Jan-19
6
A3970-3
INSTALLATION OF INSTRUMENT VALVE
0
0%
3
26-Dec-18
29-Dec-18
6
A3970-1
FIELD INSTRUMENT INSTALLATION (GAUGES / TRANSMITTERS)
0
0%
6
24-Dec-18
30-Dec-18
3
A3970-2
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
3
29-Dec-18
31-Dec-18
4
A3970-11
CABLE GLAND AND TERMINATION (ALONG JBs)
0
0%
4
25-Dec-18
29-Dec-18
3
A3970-21
CABLE GLAND AND TERMINTATION (ALONG INSTRUMENTS)
0
0%
5
27-Dec-18
01-Jan-19
3
F&G CABLE INSTALLATION
0 0
0%
26 9
09-Dec-18 11-Dec-18
07-Jan-19 20-Dec-18
3 18
A6010
F&G SUPPORTS INSTALLATION
0
0%
4
09-Dec-18
12-Dec-18
23
A6020
F&G DEVICES INSTALLATION
0
0%
4
11-Dec-18
15-Dec-18
23
A6040
F&G JB SUPPORT INSTALLATION
0
0%
3
11-Dec-18
13-Dec-18
23
A6050
F&G JB INSTALLATION
0
0%
3
12-Dec-18
15-Dec-18
23
A6060
F&G CABLE GLANDING AND TERMINATION
0
0%
5
27-Dec-18
01-Jan-19
3
A6070
F&G LOOP PREPARATION
0
0%
2
01-Jan-19
02-Jan-19
3
A6080
F&G LOOP TESTING
0
0%
4
03-Jan-19
07-Jan-19
3
15-Dec-18 15-Dec-18
06-Jan-19 24-Dec-18
11 19
15-Dec-18
27-Dec-18
19
F&G System A6030
Painting & Fireproofing Firep A4300 STRUCTURAL STEEL PAINTING AND TOUCH-UP
24-Jul-18 24-Jul-18
21-Aug-18 31-Jul-18
25 7
0%
20 9
7
0%
12
A4320
FIREPROOFING FOR STRUCTURAL STEEL
01-Aug-18
08-Aug-18
A4310
PIPING PAINTING AND TOUCH-UP
14-Aug-18
21-Aug-18
7
0%
8
29-Dec-18
06-Jan-19
8
14-Aug-18 14-Aug-18
16-Oct-18 16-Aug-18
55 3
0%
75 4
09-Sep-18 A 02-Jan-19
20-Jan-19 06-Jan-19
0 3
Pre-commisionin Pre-commisioning A2951 INST LOOP AND FUNCTIONAL TEST A4560
PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING
23-Sep-18
30-Sep-18
7
17%
58
09-Sep-18 A
31-Dec-18
4
A4600
ELECTRICAL LIGHTING TEST
23-Sep-18
16-Oct-18
21
0%
5
06-Jan-19
10-Jan-19
0
A4570
LEAK TEST FOR PIPING AND SEPARATOR
30-Sep-18
02-Oct-18
3
0%
4
12-Jan-19
15-Jan-19
0
A4580
PUNCHLIST
03-Oct-18
06-Oct-18
3
0%
4
16-Jan-19
20-Jan-19
0
A4570-1
DELUGE SKID FUNCTIONAL TESTING
0
0%
3
09-Jan-19
12-Jan-19
0
20-Jan-19 20-Jan-19
29-Jan-19 20-Jan-19
0 0 0
START OF PRODUCTION
17-Oct-18 17-Oct-18
30-Oct-18 20-Oct-18
11 3
0%
9 1
A4960
COMMISSIONING AND STARTUP
22-Oct-18
24-Oct-18
3
0%
5
20-Jan-19
24-Jan-19
A4970
PERFORMANCE TESTS
24-Oct-18
30-Oct-18
7
0%
5
24-Jan-19
29-Jan-19
0
02-Oct-18 02-Oct-18
22-Oct-18 04-Oct-18
17 3
26-Jan-19 26-Jan-19
13-Mar-19 29-Jan-19
59 59
Commissioning A4950
0%
41 4
D0010
DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)
06-Oct-18
07-Oct-18
2
0%
2
29-Jan-19
30-Jan-19
59
D0030
APPLY ANTI RUST TO FOUNDATION BOTLS
08-Oct-18
09-Oct-18
1
0%
3
30-Jan-19
02-Feb-19
59
D0020
COLD CUTTING INLET AND OUTLET PIPING
09-Oct-18
13-Oct-18
3
0%
21
02-Feb-19
25-Feb-19
59
D0040
UNBOLD & REMOVE EXISTING SEPARATOR
13-Oct-18
16-Oct-18
3
0%
3
25-Feb-19
27-Feb-19
59
D0050
REMOVE CONCRETE FOUNDATION / GRADE THE AREA
16-Oct-18
22-Oct-18
5
0%
12
28-Feb-19
13-Mar-19
59
D0060
DEMOLITION WORKS COMPLETE
22-Oct-18
0
0%
0
13-Mar-19
59
29-Nov-17
08-Nov-18
294
117
03-Dec-17 A
10-Mar-19
62
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F0010 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR
26-Dec-17 30-Dec-17 30-Dec-17 30-Dec-17
08-Feb-18 23-Jan-18 11-Jan-18 11-Jan-18
39 22 12 12
98%
44 23 23 23
07-Jun-18 A 07-Jun-18 A 06-Sep-18 A 06-Sep-18 A
15-Dec-18 20-Nov-18 20-Nov-18 20-Nov-18
14 22 0 0
METERING SKID SK F0040 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER
20-Jan-18 20-Jan-18
23-Jan-18 23-Jan-18
4 4
100%
0 0
08-Aug-18 A 08-Aug-18 A
15-Oct-18 A 15-Oct-18 A
PSV F0030
16-Jan-18 16-Jan-18
18-Jan-18 18-Jan-18
3 3
100%
0 0
09-Aug-18 A 09-Aug-18 A
23-Oct-18 A 23-Oct-18 A
13-Jan-18 13-Jan-18
15-Jan-18 15-Jan-18
3 3
99%
16 16
07-Jun-18 A 07-Jun-18 A
12-Nov-18 12-Nov-18
0
100%
0
13-Aug-18 A
03-Sep-18 A
26-Dec-17 26-Dec-17 26-Dec-17
08-Feb-18 08-Feb-18 24-Jan-18
39 39 26
0%
44 44 40
27-Sep-18 A 27-Sep-18 A 08-Oct-18 A
15-Dec-18 15-Dec-18 10-Dec-18
14 14 14
23-Jan-18
08-Feb-18
15
0%
9
05-Dec-18
15-Dec-18
14
0
100%
0
Demolition Works Work D0000 WORK PERMIT APPROVED FOR DEMOLITION
KAHM
FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFE
PIPE SUPPORT F0020 FAB. OF PIPESUPPORT STRUCTURE SHIFT TO SITE F0020-1
FABRICATION OF INSTRUMENT STANCHION SUPPORTS
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F0080 PIPING FABRICATION & FBE COATING AT KUWAIT F0110
FBE PIPING BULK DELIVER AT SITE
F0080-00
PIPE DELIVER AT KUWAIT
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
29 29
27-Sep-18 A
Page 31 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
REMANING PIPING PIP (NON FBE) F0080-000 PIPE DELIVER AT FAB FACILITY
Page 19 of32
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
0 0
42 0
27-Sep-18 A
12-Dec-18 27-Sep-18 A
8
100%
8
F0080-1
COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATIN
0
0%
38
24-Oct-18 A
08-Dec-18
F0110-1
FABRICATION SPOOLS DELIVER TO SITE
0
0%
13
28-Nov-18
12-Dec-18
8
03-Dec-17 A 03-Dec-17 A 17-Feb-18 A 17-Feb-18 A
14-Jan-19 14-Jan-19 14-Jan-19 02-Apr-18 A
20 6 6
GRADING
29-Nov-17 29-Nov-17 29-Nov-17 29-Nov-17
100%
70 70 70 0
A1650
CABLE TRENCHES AND UTILITY ROAD CROSSINGS
08-Feb-18
05-Mar-18
21
10%
24
25-Sep-18 A
21-Nov-18
7
A1700
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL
05-Mar-18
08-Mar-18
3
95%
10
04-Aug-18 A
05-Nov-18
7
A1660
DRAINAGE PIPE CULVERTS
01-Oct-18
16-Oct-18
14
0%
36
16-Oct-18 A
05-Dec-18
30
A1670
ROAD SAFETY CRASH BARRIERS AND BOLLARD
01-Oct-18
24-Oct-18
21
0%
9
05-Jan-19
14-Jan-19
6
A1690
PAVING&GRADING(GRAVEL FILL)
14-Oct-18
16-Oct-18
3
0%
9
05-Jan-19
14-Jan-19
6
A1640
ROADS AND PAVING(INCLUDING MODIFICATIONS)
17-Oct-18
01-Nov-18
14
0%
10
03-Jan-19
14-Jan-19
6
A1580-1
PROTECTION OF UNDERGROUND CABLES
0
50%
24
23-Sep-18 A
21-Nov-18
7
29-Nov-17 29-Nov-17
09-Jan-18 06-Dec-17
35 7
100%
0 0
17-Feb-18 A 17-Feb-18 A
18-Aug-18 A 02-Apr-18 A
07-Dec-17
09-Jan-18
28
INSTALLATION Civil Works COMMOMN A1580
TEST SEPERATOR SEPERAT A1585 EXCAVATION FOR THE MAIN FOUNDATIONS
01-Nov-18 01-Nov-18 01-Nov-18 04-Dec-17
289 289 289 5
A1590
FOUNDATION WORK (STEEL FIXING)
100%
0
19-May-18 A
18-Jul-18 A
A1590-1
FOUNDATION WORK (CONCRETE)
0
100%
0
01-Apr-18 A
04-Aug-18 A
A1590-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
09-Jul-18 A
18-Aug-18 A
0 0
100%
0 0
17-Feb-18 A 19-May-18 A
20-Sep-18 A 18-Jul-18 A
TEST SEPERAT SEPERATOR PLATFORM A1590-3 FOUNDATION WORK (STEEL FIXING) A1590-4
FOUNDATION WORK (CONCRETE)
0
100%
0
01-Apr-18 A
04-Aug-18 A
A1590-5
CURING / WATERPROOFING / BACK FILLING
0
100%
0
09-Jul-18 A
20-Sep-18 A
A1585-1
EXCAVATION FOR THE MAIN FOUNDATIONS
0
100%
0
17-Feb-18 A
02-Apr-18 A
7 7
100%
0 0
03-Mar-18 A 19-May-18 A
18-Sep-18 A 18-Jul-18 A
METERING SKID SK A1630 FOUNDATION WORK (STEEL FIXING)
04-Feb-18 04-Feb-18
11-Feb-18 11-Feb-18
A1585-2
EXCAVATION
0
100%
0
03-Mar-18 A
01-Apr-18 A
A1630-1
FOUNDATION WORK (CONCRETE)
0
100%
0
01-Apr-18 A
02-Aug-18 A
A1630-2
CURING / WATERPROOFING / BACK FILLING
0
PIPE SUPPORT A1610 FOUNDATION WORK (STEEL FIXING)
10-Jan-18 10-Jan-18
03-Feb-18 03-Feb-18
100%
0
01-Jul-18 A
18-Sep-18 A
21 21
100%
0 0
03-Dec-17 A 16-Dec-17 A
29-Aug-18 A 25-Aug-18 A
A1610-1
FOUNDATION WORK (CONCRETE)
0
100%
0
16-Dec-17 A
27-Aug-18 A
A1610-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
16-Dec-17 A
29-Aug-18 A
A1585-3
EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS
0
100%
0
03-Dec-17 A
18-Jul-18 A
17-Feb-18 A 20-May-18 A
13-Sep-18 A 25-Aug-18 A
20-May-18 A
26-Aug-18 A
FOUNDATION WORK (STEEL FIXING)
0 0
100%
0 0
A1630-4
FOUNDATION WORK (CONCRETE)
0
100%
0
A1630-5
CURING / WATERPROOFING / BACK FILLING
0
100%
0
02-Jul-18 A
13-Sep-18 A
A1585-4
EXCAVATION (INCLUDING AREA LIGHTING POLES)
0
100%
0
17-Feb-18 A
21-Jun-18 A
32 31 31
04-Oct-18 A 14-Oct-18 A 14-Oct-18 A
01-Dec-18 29-Nov-18 29-Nov-18
PSV A1630-3
02-Aug-18 02-Aug-18 02-Aug-18
21-Aug-18 21-Aug-18 09-Aug-18
17 17 7
15%
19-Aug-18
21-Aug-18
3
0%
9
20-Nov-18
29-Nov-18
0
METERING SKID SK A2430 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W
06-Aug-18 06-Aug-18
11-Aug-18 11-Aug-18
5 5
10%
10 10
04-Oct-18 A 04-Oct-18 A
12-Nov-18 12-Nov-18
19 19
PSV A2440
09-Aug-18 09-Aug-18
14-Aug-18 14-Aug-18
5 5
0%
8 8
08-Nov-18 08-Nov-18
17-Nov-18 17-Nov-18
13 13
15-Aug-18 15-Aug-18
18-Aug-18 18-Aug-18
3 3
0%
16 16
13-Nov-18 13-Nov-18
01-Dec-18 01-Dec-18
13 13
0 0
0%
6 6
25-Nov-18 25-Nov-18
01-Dec-18 01-Dec-18
13 13
100%
0 0
16-Oct-18 A 16-Oct-18 A
18-Oct-18 A 18-Oct-18 A
31-Dec-17 A 31-Dec-17 A 31-Dec-17 A
30-Dec-18 17-Feb-18 A 31-Dec-17 A
31-Dec-17 A
05-Jan-18 A
Structural Steel TEST SEPERATOR SEPERAT A2420 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2460
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
INSTALLATION OF PSV VALVES ACCESS PLATFORMS
PIPE SUPPORT A2450 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS FIELD INSTRUMENT INSTRUM A2450-1 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2795
INSTALLATION OF NEW TEST SEPARATOR
Piping EARLY SHUTDOWN SHUTDO WORKS - Pre Shutdown and Plant Shutdown Tie-in A5590 MOBILIZATION OF OF TEAM APPLY PTW A5600
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
16-Jul-18 16-Jul-18
01-Aug-18 01-Aug-18
15 15
02-Aug-18
17-Sep-18
40 0 0
100%
27 0 0
0
100%
0
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
21 22 22
24
Page 32 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
Page 20 of32
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
A5610
PIPING TIE-IN / NDT
0
100%
0
09-Feb-18 A
14-Feb-18 A
A5620
TIE-IN COMPLETE / REMOVE SCAFFOLD
0
100%
0
06-Feb-18 A
17-Feb-18 A
29-Nov-18 26-Dec-18
30-Dec-18 30-Dec-18
13 8
PIPING -REMAINING -REMA A2980 INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
02-Aug-18 02-Aug-18
17-Sep-18 08-Aug-18
40 6
0%
27 4
A2970
PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT
11-Aug-18
02-Sep-18
20
0%
20
29-Nov-18
22-Dec-18
8
A2990
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
03-Sep-18
05-Sep-18
3
0%
9
17-Dec-18
26-Dec-18
8
A3000
TIE-IN
06-Sep-18
17-Sep-18
10
0%
4
26-Dec-18
30-Dec-18
8
A2970-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
9
11-Dec-18
20-Dec-18
21
A3001-1
REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV
0
Electrical A3360
CABLE GLANDING AND TERMINATION
15-Jan-18 15-Jan-18
25-Sep-18 31-Jan-18
0%
3
27-Dec-18
30-Dec-18
9
218 14
0%
47 12
17-Nov-18 15-Dec-18
09-Jan-19 27-Dec-18
2 6
A3370
U/G CABLE LAYING
31-Jan-18
08-Feb-18
7
0%
14
28-Nov-18
13-Dec-18
2
A3380
CABLE TRAY INSTALLATION
11-Aug-18
26-Aug-18
14
0%
9
25-Nov-18
04-Dec-18
0
A3390
ELECTRICAL EQUIPMENTS INSTALLATION
27-Aug-18
03-Sep-18
7
0%
12
15-Dec-18
27-Dec-18
2
A3400
CABLE LAYING
04-Sep-18
11-Sep-18
7
0%
15
10-Dec-18
26-Dec-18
2
A3410
LIGHTING FIXTURES AND DB INSTALLATION
04-Sep-18
11-Sep-18
7
0%
6
22-Dec-18
27-Dec-18
2
A3420
ELECTRICAL TIE-INS
12-Sep-18
19-Sep-18
7
0%
4
02-Jan-19
06-Jan-19
2
A3430
ENERGIZATION
20-Sep-18
25-Sep-18
5
0%
3
07-Jan-19
09-Jan-19
2
A3370-1
BACK FILLING OF CABLE TRENCH
0
0%
12
15-Dec-18
27-Dec-18
10
A3400-1
HOOK UP
0
0%
4
29-Dec-18
01-Jan-19
2
A3440
EARTH PIT DRILLING
0
Instrument & Control Co A4040 MODIFICATION OF EXISTING DCS SYSTEMS BY VENDOR
0%
4
17-Nov-18
20-Nov-18
5
02-Aug-18 02-Aug-18
09-Oct-18 15-Aug-18
59 12
0%
40 9
26-Nov-18 23-Dec-18
10-Jan-19 01-Jan-19
3 4
A4000
CABLE TRAY AND SUPPORT INSTALLATION
14-Aug-18
29-Aug-18
14
0%
16
26-Nov-18
13-Dec-18
0
A4010
INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING
30-Aug-18
06-Sep-18
7
0%
4
07-Jan-19
10-Jan-19
0
A4020
INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, PRV AND CONTROL VA
08-Sep-18
15-Sep-18
7
0%
7
25-Dec-18
01-Jan-19
0
A4030
INSTRUMENT CABLE LAYING
16-Sep-18
20-Sep-18
5
0%
18
05-Dec-18
25-Dec-18
0
A5280
INSTALLATION OF DELUGE
22-Sep-18
29-Sep-18
7
0%
6
01-Jan-19
07-Jan-19
6
A4590
JB SUPPORT INSTALLATION
07-Oct-18
09-Oct-18
3
0%
3
11-Dec-18
13-Dec-18
23
A4030-1
SS TUBE INSTALLATION AND LEAK TEST
0
0%
4
02-Jan-19
06-Jan-19
0
A4020-3
INSTALLATION OF INSTRUMENT VALVE
0
0%
4
01-Jan-19
05-Jan-19
1
A4020-1
FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)
0
0%
7
25-Dec-18
01-Jan-19
0
A4020-2
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
3
30-Dec-18
01-Jan-19
4
A5350
JB INSTALLATION
0
0%
3
15-Dec-18
17-Dec-18
23
A4020-11
CABLE GLAND TERMINATION (ALONG INSRUMENT)
0
0%
6
30-Dec-18
05-Jan-19
3
A4020-21
CABLE GLAND TERMINATION (ALONG JBs)
0
0%
7
30-Dec-18
06-Jan-19
0
F&G SUPPORT INSTALLATION
0 0
0%
28 4
10-Dec-18 10-Dec-18
10-Jan-19 13-Dec-18
3 25
A6110
F&G DEVICES INSTALLATION
0
0%
4
12-Dec-18
16-Dec-18
25
A6120
F&G CABLE INSTALLATION
0
0%
9
16-Dec-18
25-Dec-18
17
A6130
F&G JB SUPPORT INSTALLATION
0
0%
2
15-Dec-18
16-Dec-18
25
A6140
F&G JB INSTALLATION
0
0%
2
17-Dec-18
18-Dec-18
23
A6150
F&G CABLE GLANDING AND TERMINATION
0
0%
5
31-Dec-18
05-Jan-19
3
A6160
F&G LOOP PREPARATION
0
0%
2
05-Jan-19
06-Jan-19
3
A6170
F&G LOOP TESTING
0
0%
4
07-Jan-19
10-Jan-19
3
28-Nov-18 28-Nov-18
29-Dec-18 08-Dec-18
34 41
F&G System A6100
0%
27 9
A4350
FIREPROOFING FOR STRUCTURAL STEEL
19-Aug-18
26-Aug-18
7
0%
17
02-Dec-18
20-Dec-18
41
A4340
PIPING PAINTING AND TOUCH-UP
06-Sep-18
13-Sep-18
7
0%
7
22-Dec-18
29-Dec-18
17
22-Aug-18 22-Aug-18
27-Sep-18 29-Aug-18
32 7
17%
74 58
09-Sep-18 A 09-Sep-18 A
19-Jan-19 31-Dec-18
0 6
Painting & Fireproofing Firep A4330 STRUCTURAL STEEL PAINTING AND TOUCH-UP
Pre-commisionin Pre-commisioning A4510 PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING
11-Aug-18 11-Aug-18
13-Sep-18 18-Aug-18
30 7
A3001
INST LOOP AND FUNCITONAL TEST
06-Sep-18
09-Sep-18
3
0%
4
07-Jan-19
10-Jan-19
0
A4520
DELUGE SKID FUNCTIONAL TEST
12-Sep-18
15-Sep-18
3
0%
3
12-Jan-19
14-Jan-19
0
A4550
ELECTRICAL LIGHITING TEST
12-Sep-18
27-Sep-18
14
0%
5
09-Jan-19
14-Jan-19
0
A4530
PUNCHLIST
16-Sep-18
18-Sep-18
3
0%
4
15-Jan-19
19-Jan-19
0
A4520-1
LEAK TEST FOR SEPARATOR AND PIPING
0
0%
5
10-Jan-19
15-Jan-19
0
8
19-Jan-19
27-Jan-19
0
Commissioning
29-Sep-18
08-Oct-18
8
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 33 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule.
Page 21 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
A4890
START OF PRODUCTION
29-Sep-18
01-Oct-18
3
0%
2
19-Jan-19
20-Jan-19
0
A4900
COMMISSIONING AND STARTUP
30-Sep-18
02-Oct-18
3
0%
4
19-Jan-19
22-Jan-19
0
A4910
PERFORMANCE TESTS
02-Oct-18
08-Oct-18
7
0%
5
22-Jan-19
27-Jan-19
0
20-Oct-18 20-Oct-18
08-Nov-18 22-Oct-18
17 3
24-Jan-19 24-Jan-19
10-Mar-19 27-Jan-19
62 62
0%
39 3
DM1010
DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)
23-Oct-18
24-Oct-18
2
0%
3
27-Jan-19
29-Jan-19
62
DM1030
APPLY ANTI RUST TO FOUNDATION BOTLS
25-Oct-18
27-Oct-18
1
0%
2
29-Jan-19
30-Jan-19
62
DM1020
COLD CUTTING INLET AND OUTLET PIPING
27-Oct-18
30-Oct-18
3
0%
21
30-Jan-19
23-Feb-19
62
DM1040
UNBOLD & REMOVE EXISTING SEPARATOR
30-Oct-18
03-Nov-18
3
0%
2
23-Feb-19
24-Feb-19
62
DM1050
REMOVE CONCRETE FOUNDATION / GRADE THE AREA
03-Nov-18
08-Nov-18
5
0%
13
24-Feb-19
10-Mar-19
62
DM1060
DEMOLITION WORKS COMPLETE
0%
Demolition Works Work DM1000 WORK PERMIT APPROVED FOR DEMOLITION
08-Nov-18
0
10-Mar-19
62
20-Feb-18
28-Nov-18
302
229
05-Jun-18 A
26-May-19
61
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F330 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR
24-Mar-18 24-Mar-18 24-Mar-18 24-Mar-18
14-May-18 17-Apr-18 05-Apr-18 05-Apr-18
45 22 12 12
40%
64 56 48 48
02-Sep-18 A 02-Sep-18 A 11-Sep-18 A 11-Sep-18 A
09-Jan-19 31-Dec-18 22-Dec-18 22-Dec-18
44 52 0 0
METERING SKID SK F340 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER
07-Apr-18 07-Apr-18
09-Apr-18 09-Apr-18
3 3
80%
48 48
11-Sep-18 A 11-Sep-18 A
22-Dec-18 22-Dec-18
0 0
PSV F350
10-Apr-18 10-Apr-18
12-Apr-18 12-Apr-18
3 3
20%
48 48
12-Sep-18 A 12-Sep-18 A
22-Dec-18 22-Dec-18
0 0
10-Apr-18 10-Apr-18
17-Apr-18 17-Apr-18
7 7
56 0
02-Sep-18 A 02-Sep-18 A
31-Dec-18 16-Sep-18 A
52
100%
14-Apr-18
17-Apr-18
4
30%
56
20-Sep-18 A
31-Dec-18
52
31-Mar-18 31-Mar-18 31-Mar-18
14-May-18 14-May-18 30-Apr-18
39 39 27
0%
45 38 29
27-Sep-18 A 27-Sep-18 A 11-Oct-18 A
09-Jan-19 01-Jan-19 22-Dec-18
0 0 0
28-Apr-18
14-May-18
15
0%
9
23-Dec-18
01-Jan-19
0
0
100%
0
0 0
0%
37 33
06-Oct-18 A 28-Nov-18
09-Jan-19 05-Jan-19
0 0
0
0%
13
26-Dec-18
09-Jan-19
0
0
JALM
FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFE
PIPE SUPPORT F370 FABRICATION OF INSTRUMENT STANCHION SUPPORTS F360
FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATI
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F400 PIPING FABRICATION & FBE COATING AT KUWAIT F430
FBE PIPING BULK DELIVER AT SITE
F400-00
PIPE DELIVER AT KUWAIT
REMAINING PIPING PI (NON FBE0 F400-1 COMPLETE PIPING FABRICATION HYDROTEST/ PAINTING & COATING F430-1
FABRICATION SPOOLS DELIVER TO SITE
F400-000
PIPE DELIVER AT FAB FACILITY
INSTALLATION Civil Works COMMOMN A1840
GRADING
20-Feb-18 20-Feb-18 20-Feb-18 20-Feb-18
0
100%
0
26-Nov-18 26-Nov-18 26-Nov-18 25-Feb-18
300 240 240 5
05-Jun-18 A 05-Jun-18 A 05-Jun-18 A 05-Jun-18 A
31-Mar-19 31-Mar-19 31-Mar-19 12-Jun-18 A
15 12 12
100%
169 135 135 0
CABLE TRENCHES AND UTILITY ROAD CROSSINGS
03-Apr-18
26-Apr-18
21
0%
51
18-Oct-18 A
23-Dec-18
17
DRAINAGE PIPE CULVERTS
03-Nov-18
18-Nov-18
14
0%
11
09-Dec-18
20-Dec-18
80
A1930
ROAD SAFETY CRASH BARRIERS AND BOLLARD
03-Nov-18
26-Nov-18
21
0%
13
17-Mar-19
31-Mar-19
12
A1935
NEW RETAINING WALLS
05-Nov-18
12-Nov-18
7
0%
14
13-Mar-19
28-Mar-19
10
A1936
RE-INSTATEMENT OF EXISTING ASPHALT ROAD
13-Nov-18
20-Nov-18
7
0%
14
13-Mar-19
28-Mar-19
10
A1938
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
21-Nov-18
24-Nov-18
3
0%
13
17-Mar-19
31-Mar-19
12
A1937
CONCRETE KERB
21-Nov-18
24-Nov-18
3
0%
14
13-Mar-19
28-Mar-19
10
A1840-1
PROTECTION OF UNDERGROUND CABLES
0
0%
5
04-Dec-18
09-Dec-18
27
A1845-6
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL
0
5
70%
24
23-Aug-18 A
21-Nov-18
26-Feb-18 26-Feb-18
07-Apr-18 05-Mar-18
35 7
100%
0 0
12-Jun-18 A 12-Jun-18 A
08-Oct-18 A 09-Aug-18 A
06-Mar-18
07-Apr-18
28
A1850
FOUNDATION WORK (STEEL FIXING)
100%
0
10-Jul-18 A
19-Aug-18 A
A1850-1
FOUNDATION WORK (CONCRETE)
0
100%
0
13-Aug-18 A
23-Aug-18 A
A1850-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
26-Aug-18 A
08-Oct-18 A
TEST SEPERAT SEPERATOR PLATFORM A1845-1 EXCAVATION FOR THE MAIN FOUNDATIONS
0 0
100%
0 0
27-Jul-18 A 27-Jul-18 A
25-Sep-18 A 11-Aug-18 A
A1850-3
FOUNDATION WORK (STEEL FIXING)
0
100%
0
12-Aug-18 A
03-Sep-18 A
A1850-4
FOUNDATION WORK (CONCRETE)
0
100%
0
03-Sep-18 A
22-Sep-18 A
A1850-5
CURING / WATERPROOFING / BACK FILLING
0
100%
0
11-Sep-18 A
25-Sep-18 A
7 7
100%
0 0
12-Jun-18 A 03-Jul-18 A
27-Sep-18 A 31-Jul-18 A
0
100%
0
09-Jul-18 A
05-Aug-18 A
A1890-1
FOUNDATION WORK (CONCRETE)
19-Apr-18 19-Apr-18
26-Apr-18 26-Apr-18
A 3
M 4
2017 J Jul A 5 6 7
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
06-Oct-18 A
A1920
METERING SKID SK A1890 FOUNDATION WORK (STEEL FIXING)
M 2
17:46
27-Sep-18 A
A1910
TEST SEPERATOR SEPERAT A1845 EXCAVATION FOR THE MAIN FOUNDATIONS
F 1
29-Nov-18
Page 34 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Page 22 of32 Act. Fin / F-C Fin
TF
A1845-2
EXCAVATION / Blinidng
0
100%
0
12-Jun-18 A
05-Jul-18 A
A1890-3
CURING / WATERPROOFING / BACK FILLING
0
100%
0
08-Aug-18 A
27-Sep-18 A
0 0
98%
53 25
09-Jul-18 A 03-Aug-18 A
25-Dec-18 22-Nov-18
0 0
PIPE SUPPORT A1845-3 EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS A1870-1
FOUNDATION WORK (STEEL FIXING)
0
92%
37
09-Jul-18 A
06-Dec-18
0
A1870-2
FOUNDATION WORK (CONCRETE)
0
75%
45
10-Sep-18 A
16-Dec-18
0
A1870-3
CURING / WATERPROOFING / BACK FILLING
0
60%
53
20-Sep-18 A
25-Dec-18
0
05-Jun-18 A 05-Jun-18 A
03-Oct-18 A 06-Sep-18 A
EXCAVATION
0 0
100%
0 0
A1890-4
FOUNDATION WORK (STEEL FIXING)
0
100%
0
09-Jul-18 A
13-Sep-18 A
A1890-5
FOUNDATION WORK (CONCRETE)
0
100%
0
16-Aug-18 A
16-Sep-18 A
A1890-6
CURING / WATERPROOFING / BACK FILLING
0
PSV A1845-4
100%
0
03-Sep-18 A
03-Oct-18 A
06-Sep-18 06-Sep-18 06-Sep-18
25-Sep-18 25-Sep-18 13-Sep-18
17 17 7
0%
68 64 64
07-Oct-18 A 07-Oct-18 A 07-Oct-18 A
14-Jan-19 09-Jan-19 09-Jan-19
14 2 2
23-Sep-18
25-Sep-18
3
0%
8
01-Jan-19
09-Jan-19
2
METERING SKID SK A2550 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W
10-Sep-18 10-Sep-18
15-Sep-18 15-Sep-18
5 5
0%
12 12
01-Jan-19 01-Jan-19
14-Jan-19 14-Jan-19
2 2
PSV A2560
13-Sep-18 13-Sep-18
18-Sep-18 18-Sep-18
5 5
0%
12 12
01-Jan-19 01-Jan-19
14-Jan-19 14-Jan-19
0 0
19-Sep-18 19-Sep-18
22-Sep-18 22-Sep-18
3 3
0%
16 16
27-Dec-18 27-Dec-18
14-Jan-19 14-Jan-19
0 0
0 0
0%
4 4
10-Jan-19 10-Jan-19
14-Jan-19 14-Jan-19
14 14
100%
0 0
10-Sep-18 A 10-Sep-18 A
14-Oct-18 A 14-Oct-18 A
79 60 32
01-Jan-19 01-Jan-19 01-Jan-19
15-Mar-19 11-Mar-19 06-Feb-19
Structural Steel TEST SEPERATOR SEPERAT A2540 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2580
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
INSTALLATION OF PSV VALVES ACCESS PLATFORMS
PIPE SUPPORT A2570 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS FIELD INSTRUMENT INSTRUM A2570-1 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2835
INSTALLATION OF NEW TEST SEPARATOR
Piping PIPING -REMAINING -REMA A3070 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT
20-Aug-18 20-Aug-18
05-Sep-18 05-Sep-18
15 15
27-Aug-18 27-Aug-18 27-Aug-18
08-Oct-18 27-Sep-18 18-Sep-18
46 28 20
0%
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
06-Sep-18
12-Sep-18
6
0%
5
06-Mar-19
11-Mar-19
11
A3090
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
13-Sep-18
16-Sep-18
3
0%
12
07-Feb-19
20-Feb-19
30
A3100
TIE-IN
17-Sep-18
27-Sep-18
10
0%
6
05-Mar-19
11-Mar-19
8
A3070-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
9
27-Jan-19
05-Feb-19
5
A3101-1
REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV
0
0%
3
09-Mar-19
11-Mar-19
8
MOBILIZATION OF HOT TAPPING SUB CONTRACTOR
18-Sep-18 18-Sep-18
08-Oct-18 20-Sep-18
18 3
0%
17 3
10-Feb-19 10-Feb-19
28-Feb-19 12-Feb-19
1 1
HT1090
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
22-Sep-18
02-Oct-18
10
0%
7
12-Feb-19
19-Feb-19
1
HT1100
FLARE TAPPING / NDT
03-Oct-18
06-Oct-18
3
0%
9
19-Feb-19
28-Feb-19
1
HT1110
FLARE TAPPING COMPLETE / REMOVE SCAFFOLD
07-Oct-18
08-Oct-18
2
0%
5
24-Feb-19
28-Feb-19
1
0 0
0%
24 2
21-Feb-19 04-Mar-19
15-Mar-19 05-Mar-19
0 0
Pre Shutdown and Plant Shutdown Tie-in A3100-2 MOBILIZATION OF OF TEAM APPLY PTW A3100-3
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
0
0%
6
05-Mar-19
11-Mar-19
0
A3100-4
PIPING TIE-IN / NDT PRE SHUT DOWN
0
0%
7
21-Feb-19
28-Feb-19
0
A3100-5
PIPING TIE-IN / NDT SHUT DOWN
0
0%
11
05-Mar-19
15-Mar-19
0
212 14
0%
84 10
25-Nov-18 05-Feb-19
02-Mar-19 16-Feb-19
2 5
CABLE GLAND AND TERMINATION
26-Feb-18 26-Feb-18
30-Oct-18 13-Mar-18
A3550
U/G CABLE LAYING
14-Mar-18
21-Mar-18
7
0%
13
12-Jan-19
26-Jan-19
4
A3560
CABLE TRAY INSTALLATION
15-Sep-18
30-Sep-18
14
0%
8
10-Jan-19
19-Jan-19
2
A3570
ELECTRICAL EQUIPMENTS INSTALLATION
01-Oct-18
08-Oct-18
7
0%
12
03-Feb-19
16-Feb-19
2
A3580
CABLE LAYING
09-Oct-18
16-Oct-18
7
0%
20
15-Jan-19
06-Feb-19
2
A3590
LIGHTING FIXTURES AND DB INSTALLATION
09-Oct-18
16-Oct-18
7
0%
6
10-Feb-19
16-Feb-19
2
A3600
ELECTRICAL TIE-INS
17-Oct-18
24-Oct-18
7
0%
6
20-Feb-19
26-Feb-19
2
A3610
ENERGIZATION
25-Oct-18
30-Oct-18
5
0%
4
26-Feb-19
02-Mar-19
2
A3580-1
HOOK UP
0
0%
4
17-Feb-19
20-Feb-19
2
A3550-1
BACK FILLING OF CABLE TRENCH
0
0%
13
26-Jan-19
09-Feb-19
4
A6180
CABLE TRENCHES
0
0%
25
25-Nov-18
23-Dec-18
5
A6190
EARTH PIT DRILLING
0
0%
6
04-Dec-18
10-Dec-18
5
55
29-Dec-18
02-Mar-19
0
Electrical A3540
Instrument & Control Co
06-Sep-18
03-Nov-18
50
M 2
A 3
M 4
2017 J Jul A 5 6 7
S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
14 14 0
A3080
HOT TAPPING HT1080
F 1
29-Nov-18
Page 35 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
Page 23 of32
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
A4140
DCS MODIFICATION IN CONTROL ROOM BY VENDOR
06-Sep-18
12-Sep-18
6
0%
5
20-Feb-19
25-Feb-19
4
A4100
CABLE TRAY AND SUPPORTS INSTALLATION
18-Sep-18
03-Oct-18
14
0%
17
29-Dec-18
16-Jan-19
3
A4540
JB SUPPORT INSTALLATION
19-Sep-18
22-Sep-18
3
0%
3
16-Jan-19
19-Jan-19
3
A4880
JB INSTALLATION
28-Sep-18
01-Oct-18
3
0%
3
20-Jan-19
22-Jan-19
3
A4110
INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST
04-Oct-18
11-Oct-18
7
0%
5
25-Feb-19
02-Mar-19
0
A4120
INSTRUMENT EQUIPEMNT INSTALLATION
13-Oct-18
20-Oct-18
7
0%
20
24-Jan-19
16-Feb-19
4
A4130
INSTRUMENT CABLE LAYING
21-Oct-18
25-Oct-18
5
0%
18
12-Jan-19
31-Jan-19
4
A5310
INSTALLATION OF DELUGE
27-Oct-18
03-Nov-18
7
0%
8
12-Feb-19
20-Feb-19
3
A4130-1
SS TUBE AND LEAK TEST
0
0%
4
21-Feb-19
25-Feb-19
3
A4120-2
INSTALLATION OF INSTRUMENT VALVE
0
0%
5
19-Feb-19
24-Feb-19
0
A4120-1
FIELD INSTRUMENT INSTALLATION (GAUGES / TRANSMITTERS)
0
0%
18
30-Jan-19
19-Feb-19
4
A4120-3
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
2
14-Feb-19
16-Feb-19
7
A4120-11
CABLE GLANDING AND TERMINATION (ALONG JBs)
0
0%
6
31-Jan-19
06-Feb-19
3
A4120-21
CABLE GLANDING AND TERMINATION (ALONG INTSTRUMENTS)
0
0%
6
19-Feb-19
25-Feb-19
4
12-Jan-19 13-Jan-19
02-Mar-19 16-Jan-19
16 52
F&G SUPPORT INSTALLATION
0 0
0%
43 4
A6210
F&G DEVICES INSTALLATION
0
0%
4
15-Jan-19
19-Jan-19
52
A6230
F&G CABLE INSTALLATION
0
0%
9
12-Jan-19
21-Jan-19
50
A6220
F&G JB SUPPORT INSTALLATION
0
0%
2
20-Jan-19
21-Jan-19
50
A6240
F&G JB INSTALLATION
0
0%
2
22-Jan-19
23-Jan-19
48
A6250
F&G CABLE GLANDING AND TERMINATION
0
0%
4
21-Feb-19
25-Feb-19
16
A6260
F&G LOOP PREPARATION
0
0%
2
26-Feb-19
27-Feb-19
16
A6270
F&G LOOP TESTING
0
F&G System A6200
Painting & Fireproofing Firep A4390 STRUCTURAL STEEL PAINTING AND TOUCH-UP
0%
3
27-Feb-19
02-Mar-19
16
15-Sep-18 15-Sep-18
30-Sep-18 22-Sep-18
14 7
0%
17 13
06-Feb-19 06-Feb-19
25-Feb-19 20-Feb-19
5 5
A4400
PIPING PAINTING AND TOUCH-UP
17-Sep-18
24-Sep-18
7
0%
13
06-Feb-19
20-Feb-19
5
A4410
FIREPROOFING FOR STRUCTURAL STEEL
23-Sep-18
30-Sep-18
7
0%
17
06-Feb-19
25-Feb-19
5
17-Sep-18 17-Sep-18
10-Nov-18 19-Sep-18
47 3
0%
130 3
09-Sep-18 A 13-Mar-19
25-Mar-19 16-Mar-19
0 0
Pre-commisionin Pre-commisioning A3101 INST LOOP AND FUNCTIONAL TESTING A4660
PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING
29-Sep-18
06-Oct-18
7
17%
109
09-Sep-18 A
28-Feb-19
10
A4700
ELECTRICAL LIGHITNG TEST
29-Sep-18
01-Nov-18
30
0%
5
19-Mar-19
24-Mar-19
0
A4670
DELUGE SKID FUNCTIONAL TESTING
02-Oct-18
04-Oct-18
3
0%
5
19-Mar-19
24-Mar-19
0
A4680
LEAK TEST FOR SEPARATOR AND PIPING
04-Nov-18
06-Nov-18
3
0%
3
21-Mar-19
24-Mar-19
0
A4690
PUNCHLIST
07-Nov-18
10-Nov-18
3
0%
4
21-Mar-19
25-Mar-19
0
16-Nov-18
8 3
0%
11 0
25-Mar-19 25-Mar-19
06-Apr-19
START OF PRODUCTION
07-Nov-18 07-Nov-18
0 0
A5080
COMMISSIONING AND STARTUP
08-Nov-18
10-Nov-18
3
0%
4
26-Mar-19
30-Mar-19
0
A5090
PERFORMANCE TESTS
10-Nov-18
16-Nov-18
7
0%
6
31-Mar-19
06-Apr-19
0
10-Nov-18 10-Nov-18
28-Nov-18 12-Nov-18
16 3
03-Apr-19 03-Apr-19
26-May-19 06-Apr-19
49 49
09-Apr-19
49
Commissioning A5070
0%
46 3
DM1150
DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)
13-Nov-18
14-Nov-18
2
0%
3
07-Apr-19
DM1170
APPLY ANTI RUST TO FOUNDATION BOTLS
15-Nov-18
17-Nov-18
1
0%
2
09-Apr-19
10-Apr-19
50
DM1160
COLD CUTTING INLET AND OUTLET PIPING
17-Nov-18
20-Nov-18
3
0%
23
10-Apr-19
06-May-19
49
DM1180
UNBOLD & REMOVE EXISTING SEPARATOR
20-Nov-18
22-Nov-18
2
0%
3
06-May-19
08-May-19
49
DM1190
REMOVE CONCRETE FOUNDATION / GRADE THE AREA
22-Nov-18
28-Nov-18
5
0%
16
08-May-19
26-May-19
49
DM1200
DEMOLITION WORKS COMPLETE
0%
Demolition Works Work DM1140 WORK PERMIT APPROVED FOR DEMOLITION
28-Nov-18
0
26-May-19
49
18-Apr-18
09-Dec-18
202
214
08-Apr-18 A
01-Jul-19
18
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F440 COMPLETE FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIR
18-Apr-18 18-Apr-18 18-Apr-18 18-Apr-18
14-Jun-18 17-May-18 03-May-18 03-May-18
50 26 14 14
50%
56 56 56 56
03-Sep-18 A 03-Sep-18 A 11-Sep-18 A 11-Sep-18 A
29-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18
29 29 4 4
METERING SKID SK F450 COMPLETE SS FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/C
05-May-18 05-May-18
08-May-18 08-May-18
4 4
80%
56 56
09-Sep-18 A 09-Sep-18 A
29-Dec-18 29-Dec-18
4 4
PSV F460
09-May-18 09-May-18
13-May-18 13-May-18
4 4
40%
40 40
11-Sep-18 A 11-Sep-18 A
10-Dec-18 10-Dec-18
33 33
10-May-18 10-May-18
17-May-18 17-May-18
7 7
48 0
03-Sep-18 A 03-Sep-18 A
19-Dec-18 16-Sep-18 A
37
100%
FAHS
COMPLETE FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTU
PIPE SUPPORT F480 FABRICATION OF INSTRUMENT STANCHION SUPPORTS
0
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 36 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
F470
COMPLETE FAB. OF PIPESUPPORT STRUCTURE BY PETROSERV & TRAN
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F510 PIPING FABRICATION & FBE COATING AT KUWAIT F540
FBE PIPING BULK DELIVER AT SITE
F510-00
PIPE DELIVER AT KUWAIT
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
14-May-18 01-May-18 01-May-18 01-May-18 29-May-18
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
17-May-18
4
40%
48
12-Sep-18 A
19-Dec-18
4
14-Jun-18 14-Jun-18 27-May-18
39 39 23
0%
47 47 39
27-Sep-18 A 27-Sep-18 A 11-Oct-18 A
25-Dec-18 25-Dec-18 16-Dec-18
8 3 3
14-Jun-18
15
0%
8
17-Dec-18
25-Dec-18
3
0
100%
0
0 0
0%
41 33
06-Oct-18 A 05-Nov-18
22-Dec-18 12-Dec-18
11 11
0
0%
16
04-Dec-18
22-Dec-18
11
0
REMANING PIPING PIP (NON FBE) F510-1 COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATING F540-1
FABRICATION SPOOLS DELIVER TO SITE
F510-000
PIPE DELIVER AT FAB FACILITY
Page 24 of32
100%
0
18-Nov-18 18-Nov-18 18-Nov-18 08-May-18
176 176 176 10
08-Apr-18 A 08-Apr-18 A 08-Apr-18 A 08-Apr-18 A
16-May-19 16-May-19 16-May-19 14-Apr-18 A
0 0 0
GRADING
100%
A2030
CABLE TRENCHES AND UTILITY ROAD CROSSINGS
27-Jun-18
21-Jul-18
21
35%
40
10-Sep-18 A
10-Dec-18
0
A2020
ROADS AND PAVING(INCLUDING MODIFICATIONS)
25-Oct-18
10-Nov-18
14
0%
14
04-Apr-19
20-Apr-19
0
A2040
DRAINAGE PIPE CULVERTS
25-Oct-18
10-Nov-18
14
0%
36
11-Dec-18
21-Jan-19
0
A2050
ROAD SAFETY CRASH BARRIERS AND BOLLARD
25-Oct-18
18-Nov-18
21
0%
13
18-Apr-19
02-May-19
0
A2080
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
07-Nov-18
10-Nov-18
3
0%
13
02-May-19
16-May-19
0
A1960-1
PROTECTION OF UNDERGROUND CABLES
0
90%
4
10-Sep-18 A
10-Dec-18
0
A1965-5
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL
0
55%
40
05-Sep-18 A
10-Dec-18
0
09-May-18 09-May-18
18-Jun-18 16-May-18
35 7
100%
0 0
08-Apr-18 A 08-Apr-18 A
13-Sep-18 A 04-May-18 A
17-May-18
18-Jun-18
05-Jul-18 A
A1970
FOUNDATION WORK (STEEL FIXING)
28
100%
0
02-Jun-18 A
A1970-1
FOUNDATION WORK (CONCRETE)
0
100%
0
02-Jun-18 A
19-Jul-18 A
A1970-2
CURING / WATERPROOFING / BACK FILLING
0
100%
0
19-Jul-18 A
13-Sep-18 A
TEST SEPERAT SEPERATOR PLATFORM A1965-1 EXCAVATION FOR THE MAIN FOUNDATIONS
0 0
53 0
01-Aug-18 A 01-Aug-18 A
25-Dec-18 09-Oct-18 A
7
100%
A1970-3
FOUNDATION WORK (STEEL FIXING)
0
90%
37
22-Aug-18 A
06-Dec-18
7
A1970-4
FOUNDATION WORK (CONCRETE)
0
35%
16
03-Sep-18 A
16-Dec-18
7
A1970-5
CURING / WATERPROOFING / BACK FILLING
0
15%
16
16-Sep-18 A
25-Dec-18
7
7 7
14-Apr-18 A 09-Jul-18 A
01-Dec-18 10-Sep-18 A
29
100%
32 0
A1965-2
EXCAVATION
0
100%
0
14-Apr-18 A
21-Jul-18 A
A2010-1
FOUNDATION WORK (CONCRETE)
0
100%
0
15-Aug-18 A
24-Sep-18 A
A2010-2
CURING / WATERPROOFING / BACK FILLING
0
65%
32
11-Sep-18 A
01-Dec-18
29
21 21
30%
40 36
18-Jul-18 A 14-Sep-18 A
10-Dec-18 05-Dec-18
12 12
METERING SKID SK A2010 FOUNDATION WORK (STEEL FIXING)
PIPE SUPPORT A1990 FOUNDATION WORK (STEEL FIXING)
14-Jul-18 14-Jul-18
19-Jun-18 19-Jun-18
21-Jul-18 21-Jul-18
12-Jul-18 12-Jul-18
A1965-3
EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS
0
98%
26
18-Jul-18 A
24-Nov-18
12
A1990-1
FOUNDATION WORK (CONCRETE)
0
0%
20
30-Sep-18 A
10-Dec-18
12
A1990-2
CURING / WATER PROOFING / BACKFILL
0
0%
15
03-Oct-18 A
10-Dec-18
12
100%
43 0
21-May-18 A 21-May-18 A
13-Dec-18 08-Aug-18 A
34
EXCAVATION
0 0
A2010-4
FOUNDATION WORK (CONCRETE)
0
90%
27
08-Jul-18 A
29-Nov-18
34
A2010-3
FOUNDATION WORK (STEEL FIXING)
0
95%
19
05-Jun-18 A
15-Nov-18
34
A2010-5
CURING / WATERPROOFING / BACK FILLING
0
PSV A1965-4
90%
18
08-Sep-18 A
13-Dec-18
34
24-Sep-18 24-Sep-18 24-Sep-18
13-Oct-18 13-Oct-18 01-Oct-18
17 17 7
0%
42 17 17
16-Dec-18 30-Dec-18 30-Dec-18
02-Feb-19 17-Jan-19 17-Jan-19
4 13 7
10-Oct-18
13-Oct-18
3
0%
9
08-Jan-19
17-Jan-19
13
METERING SKID SK A2610 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W
27-Sep-18 27-Sep-18
02-Oct-18 02-Oct-18
5 5
0%
18 18
31-Dec-18 31-Dec-18
20-Jan-19 20-Jan-19
4 4
PSV A2620
01-Oct-18 01-Oct-18
06-Oct-18 06-Oct-18
5 5
0%
8 8
16-Dec-18 16-Dec-18
24-Dec-18 24-Dec-18
33 33
07-Oct-18 07-Oct-18
09-Oct-18 09-Oct-18
3 3
0%
28 28
20-Dec-18 20-Dec-18
21-Jan-19 21-Jan-19
4 4
0 0
0%
5 5
28-Jan-19 28-Jan-19
02-Feb-19 02-Feb-19
4 4
Structural Steel TEST SEPERATOR SEPERAT A2600 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2640
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
INSTALLATION OF PSV VALVES ACCESS PLATFORMS
PIPE SUPPORT A2630 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS FIELD INSTRUMENT INSTRUM A2630-1 INSTALLATION OF INSTRUMENT STANCHION
A 3
M 4
2017 J Jul A 5 6 7
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
06-Oct-18 A
175 175 175 0
TEST SEPERATOR SEPERAT A1965 EXCAVATION FOR THE MAIN FOUNDATIONS
M 2
17:46
27-Sep-18 A
28-Apr-18 28-Apr-18 28-Apr-18 28-Apr-18
INSTALLATION Civil Works COMMOMN A1960
F 1
29-Nov-18
Page 37 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
Mechanical A2855
INSTALLATION OF NEW TEST SEPARATOR
Piping PIPING -REMAINING -REMA A3120 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT
U3963- Updated Revised Baseline Schedule.
Page 25 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
06-Sep-18 06-Sep-18
23-Sep-18 23-Sep-18
15 15
100%
0 0
06-Oct-18 A 06-Oct-18 A
08-Oct-18 A 08-Oct-18 A
15-Sep-18 15-Sep-18 15-Sep-18
25-Oct-18 11-Oct-18 01-Oct-18
36 24 15
0%
104 45 37
23-Dec-18 23-Dec-18 23-Dec-18
22-Apr-19 12-Feb-19 03-Feb-19
11 70 3
A3130
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
24-Sep-18
30-Sep-18
6
0%
5
29-Jan-19
03-Feb-19
4
A3140
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
01-Oct-18
03-Oct-18
3
0%
13
29-Jan-19
12-Feb-19
4
A3150
TIE-IN
04-Oct-18
11-Oct-18
7
0%
5
29-Jan-19
03-Feb-19
4
A3120-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
9
15-Jan-19
24-Jan-19
4
A3151-1
REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV
0
0%
3
31-Jan-19
03-Feb-19
78
MOBILIZATION OF HOT TAPPING SUB CONTRACTOR
06-Oct-18 06-Oct-18
25-Oct-18 08-Oct-18
18 3
0%
46 3
28-Feb-19 28-Feb-19
22-Apr-19 03-Mar-19
4 4
HT1130
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
09-Oct-18
20-Oct-18
10
0%
9
03-Mar-19
12-Mar-19
4
HT1140
FLARE TIE-IN / NDT
21-Oct-18
23-Oct-18
3
0%
13
13-Mar-19
27-Mar-19
4
HT1150
HOT TIE-IN COMPLETE / REMOVE SCAFFOLD
24-Oct-18
25-Oct-18
2
HOT TAPPING HT1120
Pre Shutdown and Plant Shutdown Tie-in A3150-000 MOBILIZATION OF OF TEAM APPLY PTW
0%
12
09-Apr-19
22-Apr-19
4
0 0
0%
21 1
30-Mar-19 30-Mar-19
22-Apr-19 30-Mar-19
4 4
A3150-00
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
0
0%
8
31-Mar-19
08-Apr-19
4
A3150-1
PIPING TIE-IN / NDT PRE SHUT DOWN
0
0%
15
30-Mar-19
15-Apr-19
4
A3150-2
PIPING TIE-IN / NDT SHUT DOWN
0
0%
7
15-Apr-19
22-Apr-19
4
158 14
0%
81 12
10-Sep-18 A 30-Dec-18
27-Jan-19 12-Jan-19
4 5
CABLE GLAND AND TERMINATION
09-May-18 09-May-18
08-Nov-18 24-May-18
A3640
U/G CABLE LAYING
26-May-18
02-Jun-18
7
0%
7
03-Jan-19
10-Jan-19
4
A3650
CABLE TRAY INSTALLATION
24-Sep-18
09-Oct-18
14
0%
17
20-Dec-18
08-Jan-19
3
A3660
ELECTRICAL EQUIPMENTS INSTALLATION
10-Oct-18
17-Oct-18
7
0%
12
30-Dec-18
12-Jan-19
3
A3670
CABLE LAYING
18-Oct-18
25-Oct-18
7
0%
15
23-Dec-18
08-Jan-19
3
A3680
LIGHTING FIXTURE AND DB INSTALLATION
18-Oct-18
25-Oct-18
7
0%
7
05-Jan-19
12-Jan-19
3
A3690
ELECTRICAL TIE-INS
27-Oct-18
03-Nov-18
7
0%
2
16-Jan-19
17-Jan-19
3
A3700
ENERGIZATION
04-Nov-18
08-Nov-18
5
0%
4
17-Jan-19
21-Jan-19
3
A3640-1
BACK FILLING OF CABLE TRENCH
0
0%
15
10-Jan-19
27-Jan-19
4
A3670-1
HOOK UP
0
0%
5
12-Jan-19
16-Jan-19
3
A3920
EARTH PIT DRILLING
0
0%
4
20-Dec-18
24-Dec-18
5
A6520
CABLE TRENCHES
0
35%
40
10-Sep-18 A
10-Dec-18
4
40 14
0%
57 15
05-Jan-19 05-Jan-19
11-Mar-19 21-Jan-19
4 4
Electrical A3630
Instrument & Control Co A4150 CABLE TRAY AND SUPPORT INSTALLATION
08-Sep-18 08-Sep-18
23-Oct-18 23-Sep-18
A4160
INSTRUMENT EQUIPMENT CALIBRATION/ LOOP TEST
24-Sep-18
01-Oct-18
7
0%
6
05-Mar-19
11-Mar-19
4
A4190
DCS MODIFICATION IN CONTROL ROOM BY VENDOR
24-Sep-18
07-Oct-18
12
0%
6
24-Feb-19
02-Mar-19
4
A4170
INSTRUMENT EQUIPEMNT INSTALLATION (RO, CONTROL VALVE, PRV, SDV
02-Oct-18
09-Oct-18
7
0%
17
02-Feb-19
20-Feb-19
4
A4180
INSTRUMENT CABLE LAYING
10-Oct-18
15-Oct-18
5
0%
17
17-Jan-19
05-Feb-19
5
A5320
INSTALLATION OF DELUGE
16-Oct-18
23-Oct-18
7
0%
5
16-Feb-19
20-Feb-19
7
A4180-1
SS TUBE AND LEAK TEST
0
0%
4
02-Mar-19
05-Mar-19
7
A4170-1
INSTALLATION OF INSTRUMENT VALVE
0
0%
6
14-Feb-19
20-Feb-19
4
A4170-2
FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)
0
0%
17
02-Feb-19
20-Feb-19
4
A4170-3
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
3
18-Feb-19
20-Feb-19
5
A3710
JB SUPPORT INSTALLATION
0
0%
4
17-Jan-19
21-Jan-19
4
A3810
JB INSTALLATION
0
0%
4
22-Jan-19
26-Jan-19
4
A3900
CABLE GLANDING AND TERMINATION (ALONG JBs)
0
0%
5
27-Jan-19
31-Jan-19
5
A3910
CABLE GLANDING AND TERMINATION (ALONG INSTRUMENTS)
0
0%
5
20-Feb-19
25-Feb-19
4
F&G SUPPORT INSTALLATION
0 0
0%
41 4
17-Jan-19 17-Jan-19
05-Mar-19 21-Jan-19
44 78
A6300
F&G DEVICES INSTALLATION
0
0%
4
21-Jan-19
24-Jan-19
78
A6280
F&G CABLE INSTALLATION
0
0%
9
17-Jan-19
27-Jan-19
76
A6310
F&G JB SUPPORT INSTALLATION
0
0%
2
22-Jan-19
23-Jan-19
79
A6320
F&G JB INSTALLATION
0
0%
2
27-Jan-19
28-Jan-19
75
A6330
F&G CABLE GLANDING AND TERMINATION
0
0%
5
20-Feb-19
25-Feb-19
46
A6340
F&G LOOP PREPARATION
0
0%
3
25-Feb-19
27-Feb-19
46
A6350
F&G LOOP TESTING
0
0%
3
03-Mar-19
05-Mar-19
44
F&G System A6290
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 38 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
Painting & Fireproofing Firep A4420 STRUCTURAL STEEL PAINTING AND TOUCH-UP
U3963- Updated Revised Baseline Schedule.
Page 26 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
02-Oct-18 02-Oct-18
17-Oct-18 09-Oct-18
14 7
0%
30 12
27-Jan-19 27-Jan-19
02-Mar-19 09-Feb-19
5 5
A4430
PIPING PAINTING AND TOUCH-UP
04-Oct-18
11-Oct-18
7
0%
13
29-Jan-19
12-Feb-19
10
A4440
FIREPROOFING FOR STRUCTURAL STEEL
10-Oct-18
17-Oct-18
7
0%
25
02-Feb-19
02-Mar-19
5
04-Oct-18 04-Oct-18
13-Nov-18 07-Oct-18
35 3
0%
168 3
09-Sep-18 A 23-Apr-19
08-May-19 25-Apr-19
3 3
21-Mar-19
18
Pre-commisionin Pre-commisioning A3151 INST LOOP AND FUNCTIONAL TESTING A4710
PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING
13-Oct-18
20-Oct-18
7
17%
127
09-Sep-18 A
A4750
ELECTRICAL LIGHTING TEST
13-Oct-18
10-Nov-18
25
0%
5
25-Apr-19
30-Apr-19
3
A4720
DELUGE SKID FUNCTIONAL TESTING
16-Oct-18
18-Oct-18
3
0%
5
30-Apr-19
05-May-19
3
A4730
PUNCHLIST
11-Nov-18
13-Nov-18
3
0%
4
05-May-19
08-May-19
3
A4720-1
LEAK TEST FOR SEPARATOR AND PIPING
0
0%
3
02-May-19
05-May-19
3
START OF PRODUCTION
17-Nov-18 17-Nov-18
26-Nov-18 20-Nov-18
8 3
0%
10 1
09-May-19 09-May-19
20-May-19 09-May-19
0 3
A5140
COMMISSIONING AND STARTUP
18-Nov-18
21-Nov-18
3
0%
4
09-May-19
13-May-19
3
A5150
PERFORMANCE TESTS
21-Nov-18
26-Nov-18
7
0%
3
18-May-19
20-May-19
0
20-Nov-18 20-Nov-18
09-Dec-18 24-Nov-18
16 3
18-May-19 18-May-19
01-Jul-19 20-May-19
18 18
Commissioning A5130
0%
39 3
DM1220
DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)
24-Nov-18
26-Nov-18
2
0%
2
21-May-19
22-May-19
18
DM1240
APPLY ANTI RUST TO FOUNDATION BOTLS
26-Nov-18
27-Nov-18
1
0%
1
22-May-19
23-May-19
18
DM1230
COLD CUTTING INLET AND OUTLET PIPING
27-Nov-18
01-Dec-18
3
0%
21
23-May-19
16-Jun-19
18
DM1250
UNBOLD & REMOVE EXISTING SEPARATOR
01-Dec-18
03-Dec-18
2
0%
2
16-Jun-19
18-Jun-19
18
DM1260
REMOVE CONCRETE FOUNDATION / GRADE THE AREA
03-Dec-18
09-Dec-18
5
0%
12
18-Jun-19
01-Jul-19
18
DM1270
DEMOLITION WORKS COMPLETE
09-Dec-18
0
0%
0
01-Jul-19
18
Demolition Works Work DM1210 WORK PERMIT APPROVED FOR DEMOLITION
19-May-18
16-Dec-18
182
209
05-May-18 A
25-Jun-19
23
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F550 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR
19-May-18 19-May-18 19-May-18 19-May-18
08-Jul-18 21-Jun-18 05-Jun-18 05-Jun-18
44 30 16 16
45%
62 60 60 60
03-Sep-18 A 03-Sep-18 A 10-Sep-18 A 10-Sep-18 A
05-Jan-19 02-Jan-19 02-Jan-19 02-Jan-19
88 90 0 0
METERING SKID SK F560 FAB OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER
06-Jun-18 06-Jun-18
11-Jun-18 11-Jun-18
5 5
80%
60 60
12-Sep-18 A 12-Sep-18 A
02-Jan-19 02-Jan-19
2 2
PSV F570
12-Jun-18 12-Jun-18
17-Jun-18 17-Jun-18
5 5
50%
48 48
11-Sep-18 A 11-Sep-18 A
19-Dec-18 19-Dec-18
25 25
14-Jun-18 14-Jun-18
21-Jun-18 21-Jun-18
7 7
60 0
03-Sep-18 A 03-Sep-18 A
02-Jan-19 11-Oct-18 A
90
100%
FAHN
FAB OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFE
PIPE SUPPORT F590 FABRICATION OF INSTRUMENT STANCHION SUPPORTS F580
FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATI
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F620 PIPING FABRICATION & FBE COATING AT KUWAIT F650
FBE PIPING BULK DELIVER AT SITE
F620-000
PIPE DELIVER AT KUWAIT
18-Jun-18
21-Jun-18
4
45%
60
11-Sep-18 A
02-Jan-19
0
28-May-18 28-May-18 28-May-18
08-Jul-18 08-Jul-18 18-Jun-18
36 36 19
0%
48 48 39
27-Sep-18 A 27-Sep-18 A 14-Oct-18 A
05-Jan-19 05-Jan-19 25-Dec-18
34 34 34
25-Jun-18
08-Jul-18
12
0%
9
26-Dec-18
05-Jan-19
34
0
100%
0
0%
40 33
06-Oct-18 A 19-Nov-18 16-Dec-18
0 0
REMAINING PIPING PI (NON FBE) F620-1 COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATIN
03-Jan-19 26-Dec-18
20 20
03-Jan-19
20
FABRICATION SPOOLS DELIVER TO SITE
0
0%
17
F620-00
PIPE DELIVER AT PETROSERV FACILITY BY CPECC - DRV
0
100%
0 05-May-18 A 05-May-18 A 05-May-18 A 05-May-18 A
05-May-19 05-May-19 05-May-19 10-May-18 A
4 4 4
16-Apr-19
05-May-19
4
GRADING
100%
165 165 165 0
A2160
UTILITY ROAD CROSSINGS
22-Nov-18
16-Dec-18
21
0%
17
A2150
ROADS AND PAVING(INCLUDING MODIFICATIONS)
22-Nov-18
08-Dec-18
14
0%
14
13-Apr-19
28-Apr-19
4
A2170
DRAINAGE PIPE CULVERTS
22-Nov-18
08-Dec-18
14
0%
11
25-Dec-18
06-Jan-19
4
A2180
ROAD SAFETY CRASH BARRIERS AND BOLLARD
22-Nov-18
16-Dec-18
21
0%
13
21-Apr-19
05-May-19
4
A2200
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
05-Dec-18
08-Dec-18
3
0%
14
13-Apr-19
28-Apr-19
4
A2090-1
PROTECTION OF UNDERGROUND CABLES
0
80%
52
13-Aug-18 A
24-Dec-18
9
A2095-00
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL
0
50%
12
18-Sep-18 A
07-Nov-18
4
A2160-1
CABLE TRENCHES
0
0%
40
08-Nov-18
24-Dec-18
4
100%
0 0
05-May-18 A 05-May-18 A
09-Sep-18 A 04-Aug-18 A
25-Jun-18 25-Jun-18
155 155 155 5
04-Aug-18 02-Jul-18
35 7
A 3
M 4
2017 J Jul A 5 6 7
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
06-Oct-18 A
19-Jun-18 19-Jun-18 19-Jun-18 19-Jun-18
TEST SEPERATOR SEPERAT A2095 EXCAVATION FOR THE MAIN FOUNDATIONS
16-Dec-18 16-Dec-18 16-Dec-18 24-Jun-18
M 2
17:46
27-Sep-18 A
F650-1 INSTALLATION Civil Works COMMOMN A2090
F 1
29-Nov-18
Page 39 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
03-Jul-18
04-Aug-18
Page 27 of32
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
A2100
FOUNDATION WORK (STEEL FIXING)
28
100%
0
03-Jul-18 A
16-Aug-18 A
A2100-3
CURING / WATERPROOFING / BACK FILLING
0
100%
0
05-Aug-18 A
09-Sep-18 A
A2100-1
FOUNDATION WORK (CONCRETE)
0
100%
0
17-Jul-18 A
23-Aug-18 A
0 0
40%
58 28
28-Aug-18 A 28-Aug-18 A
31-Dec-18 26-Nov-18
8 8
TEST SEPERAT SEPERATOR PLATFORM A2095-1 EXCAVATION FOR THE MAIN FOUNDATIONS A2100-5
FOUNDATION WORK (CONCRETE)
0
0%
18
22-Nov-18
12-Dec-18
8
A2100-4
FOUNDATION WORK (STEEL FIXING)
0
0%
15
10-Oct-18 A
03-Dec-18
16
A2140-125
CURING / WATER PROOFING / BACKFILL
0
0%
25
03-Dec-18
31-Dec-18
8
7 7
05-May-18 A 04-Jul-18 A
26-Nov-18 05-Sep-18 A
39 39
100%
28 0
A2140-2
CURING / WATERPROOFING / BACK FILLING
0
0%
28
08-Oct-18 A
26-Nov-18
A2095-2
EXCAVATION
0
100%
0
05-May-18 A
07-Aug-18 A
A2140-1
FOUNDATION WORK (CONCRETE)
0
95%
3
28-Aug-18 A
28-Oct-18
39
21 21
80%
60 31
04-Aug-18 A 08-Sep-18 A
02-Jan-19 29-Nov-18
2 12
METERING SKID SK A2140 FOUNDATION WORK (STEEL FIXING)
PIPE SUPPORT A2120 FOUNDATION WORK (STEEL FIXING)
29-Aug-18 29-Aug-18
05-Aug-18 05-Aug-18
05-Sep-18 05-Sep-18
28-Aug-18 28-Aug-18
A2120-2
CURING / WATERPROOFING / BACK FILLING
0
20%
45
16-Sep-18 A
02-Jan-19
2
A2095-3
EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS
0
90%
19
04-Aug-18 A
15-Nov-18
17
A2120-1
FOUNDATION WORK (CONCRETE)
0
80%
48
11-Sep-18 A
19-Dec-18
2
50%
56 44
26-May-18 A 18-Sep-18 A
29-Dec-18 15-Dec-18
34 34
CURING / WATERPROOFING / BACK FILLING
0 0
A2095-4
EXCAVATION
0
100%
0
26-May-18 A
22-Oct-18 A
A2140-3
FOUNDATION WORK (STEEL FIXING)
0
80%
19
09-Jul-18 A
15-Nov-18
34
A2140-4
FOUNDATION WORK (CONCRETE)
0
70%
56
10-Sep-18 A
29-Dec-18
34
17 7 7
0%
35 18 18
26-Dec-18 06-Jan-19 06-Jan-19
04-Feb-19 26-Jan-19 26-Jan-19
67 4 4
0
PSV A2140-5
11-Oct-18 11-Oct-18 11-Oct-18
30-Oct-18 18-Oct-18 18-Oct-18
0%
9
16-Jan-19
26-Jan-19
4
METERING SKID SK A2670 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W
15-Oct-18 15-Oct-18
20-Oct-18 20-Oct-18
5 5
0%
11 11
09-Jan-19 09-Jan-19
21-Jan-19 21-Jan-19
2 2
PSV A2680
18-Oct-18 18-Oct-18
23-Oct-18 23-Oct-18
5 5
0%
9 9
26-Dec-18 26-Dec-18
05-Jan-19 05-Jan-19
25 25
PIPE SUPPORT A2690 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS
24-Oct-18 24-Oct-18
27-Oct-18 27-Oct-18
3 3
0%
18 18
10-Jan-19 10-Jan-19
30-Jan-19 30-Jan-19
0 0
FIELD INSTRUMENT INSTRUM A2700 INSTALLATION OF INSTRUMENT STANCHION
28-Oct-18 28-Oct-18
30-Oct-18 30-Oct-18
3 3
0%
5 5
30-Jan-19 30-Jan-19
04-Feb-19 04-Feb-19
67 67
24-Sep-18 24-Sep-18
10-Oct-18 10-Oct-18
15 15
100%
0 0
05-Sep-18 A 05-Sep-18 A
12-Sep-18 A 12-Sep-18 A
03-Oct-18 03-Oct-18 03-Oct-18
29-Oct-18 29-Oct-18 18-Oct-18
23 23 14
0%
79 77 21
21-Jan-19 21-Jan-19 21-Jan-19
22-Apr-19 20-Apr-19 13-Feb-19
4 6 0
Structural Steel TEST SEPERATOR SEPERAT A2660 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2660-1
Mechanical A2875
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
INSTALLATION OF PSV VALVES ACCESS PLATFORMS
INSTALLATION OF NEW TEST SEPARATOR
Piping PIPING -REMAINING -REMA A3170 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT A3180
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
11-Oct-18
17-Oct-18
6
0%
5
15-Apr-19
20-Apr-19
0
A3190
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
18-Oct-18
21-Oct-18
3
0%
13
02-Feb-19
16-Feb-19
4
A3200
TIE-IN
22-Oct-18
29-Oct-18
7
0%
5
15-Apr-19
20-Apr-19
0
A3170-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
12
29-Jan-19
11-Feb-19
56
A3151-11
REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV
0
Pre Shutdown and Plant Shutdown Tie-in A3200-2 PIPING TIE-IN / NDT SHUT DOWN
0%
3
17-Apr-19
20-Apr-19
6
0 0
0%
26 7
24-Mar-19 15-Apr-19
22-Apr-19 22-Apr-19
4 4
A3200-b
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
0
0%
7
24-Mar-19
31-Mar-19
0
A3200-1
PIPING TIE-IN / NDT PRE SHUT DOWN
0
0%
14
31-Mar-19
15-Apr-19
0
A3200-a
MOBILIZATION OF OF TEAM APPLY PTW
0
0%
1
24-Mar-19
24-Mar-19
0
140 14
0%
108 12
08-Nov-18 16-Feb-19
13-Mar-19 28-Feb-19
4 5
Electrical A3720
CABLE GLAND AND TERMINATION
25-Jun-18 25-Jun-18
04-Dec-18 10-Jul-18
A3730
U/G CABLE LAYING
11-Jul-18
18-Jul-18
7
0%
8
30-Dec-18
07-Jan-19
5
A3740
CABLE TRAY INSTALLATION
20-Oct-18
04-Nov-18
14
0%
9
26-Jan-19
04-Feb-19
4
A3750
ELECTRICAL EQUIPMENTS INSTALLATION
05-Nov-18
12-Nov-18
7
0%
12
02-Feb-19
14-Feb-19
4
A3760
CABLE LAYING
13-Nov-18
20-Nov-18
7
0%
17
30-Jan-19
18-Feb-19
4
A3770
LIGHTING FIXTURE AND DB INSTALLATION
13-Nov-18
20-Nov-18
7
0%
9
21-Feb-19
03-Mar-19
4
A3780
ELECTRICAL TIE-INS
21-Nov-18
28-Nov-18
7
0%
2
07-Mar-19
09-Mar-19
4
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 40 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
29-Nov-18
04-Dec-18
Page 28 of32
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
A3790
ENERGIZATION
5
0%
4
10-Mar-19
13-Mar-19
4
A3730-1
BACK FILLING OF CABLE TRENCH
0
0%
12
06-Jan-19
19-Jan-19
5
A3760-1
HOOK UP
0
0%
5
03-Mar-19
07-Mar-19
4
A2160-11
CABLE TRENCHES
0
0%
40
08-Nov-18
24-Dec-18
5
A3930
EARTH PIT DRILLING
0
Instrument & Control Co A4240 DCS MODIFICATION IN CONTROL ROOM BY VENDOR
0%
5
31-Dec-18
05-Jan-19
5
11-Oct-18 11-Oct-18
08-Dec-18 17-Oct-18
50 6
0%
40 9
16-Jan-19 12-Feb-19
03-Mar-19 21-Feb-19
2 4
A4930
JB INSTALLATION
16-Oct-18
19-Oct-18
3
0%
3
30-Jan-19
02-Feb-19
4
A4940
JB SUPPORT INSTALLATION
16-Oct-18
19-Oct-18
3
0%
4
27-Jan-19
30-Jan-19
4
A4200
CABLE TRAY AND SUPPORTS INSTALLATION
23-Oct-18
07-Nov-18
14
0%
13
16-Jan-19
30-Jan-19
2
A4990
CABLE GLAND AND TERMINATION (ALONG INSTRUMENTS)
30-Oct-18
01-Nov-18
3
0%
7
16-Feb-19
23-Feb-19
2
A4210
INSTRUMENT EQUIPMENT CALIBRATION
08-Nov-18
15-Nov-18
7
0%
6
25-Feb-19
03-Mar-19
2
A4220
INSTRUMENT EQUIPEMNT INSTALLATION (RO, CONTROL VALVE, PRV, SDV
17-Nov-18
24-Nov-18
7
0%
18
23-Jan-19
12-Feb-19
2
A4230
INSTRUMENT CABLE LAYING
25-Nov-18
29-Nov-18
5
0%
16
22-Jan-19
09-Feb-19
2
A5330
INSTALLATION OF DELUGE
01-Dec-18
08-Dec-18
7
0%
7
05-Feb-19
12-Feb-19
4
A4230-1
SS TUBE AND LEAK TEST
0
0%
4
23-Feb-19
26-Feb-19
2
A4220-1
INSTALLATION OF INSTRUMENT VALVE
0
0%
3
10-Feb-19
12-Feb-19
15
A4220-2
FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)
0
0%
23
23-Jan-19
18-Feb-19
2
A4220-3
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
3
10-Feb-19
12-Feb-19
4
A3800
FIELD INSTRUMENT INSTALLATION
0
0%
17
09-Feb-19
27-Feb-19
4
A4980
CABLE GLAND AND TERMINATION (ALONG JBs)
0
0%
10
10-Feb-19
20-Feb-19
4
22-Jan-19 27-Jan-19
27-Feb-19 30-Jan-19
40 62
F&G SUPPORT INSTALLATION
0 0
0%
32 4
A6380
F&G DEVICES INSTALLATION
0
0%
4
29-Jan-19
02-Feb-19
62
A6360
F&G CABLE INSTALLATION
0
0%
8
22-Jan-19
30-Jan-19
64
A6390
F&G JB SUPPORT INSTALLATION
0
0%
2
30-Jan-19
31-Jan-19
63
A6400
F&G JB INSTALLATION
0
0%
3
02-Feb-19
04-Feb-19
60
A6410
F&G CABLE GLANDING AND TERMINATION
0
0%
5
18-Feb-19
23-Feb-19
18
A6420
F&G LOOP PREPARATION
0
0%
2
23-Feb-19
24-Feb-19
18
A6430
F&G LOOP TESTING
0
0%
4
24-Feb-19
27-Feb-19
18
04-Feb-19 04-Feb-19
04-Mar-19 18-Feb-19
4 4
04-Feb-19
18-Feb-19
4
F&G System A6370
Painting & Fireproofing Firep A4450 STRUCTURAL STEEL PAINTING AND TOUCH-UP
20-Oct-18 20-Oct-18
04-Nov-18 27-Oct-18
14 7
0%
25 13
7
0%
13
A4460
PIPING PAINTING AND TOUCH-UP
22-Oct-18
29-Oct-18
A4470
FIREPROOFING FOR STRUCTURAL STEEL
28-Oct-18
04-Nov-18
7
0%
20
10-Feb-19
04-Mar-19
4
22-Oct-18 22-Oct-18
15-Dec-18 24-Oct-18
47 3
0%
162 3
09-Sep-18 A 16-Apr-19
01-May-19 18-Apr-19
1 0
Pre-commisionin Pre-commisioning A3201 INST LOOP AND FUNCTIONAL TESTING A4760
PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING
30-Oct-18
06-Nov-18
7
17%
127
09-Sep-18 A
21-Mar-19
18
A4800
ELECTRICAL LIGHITNG TESTING
30-Oct-18
26-Nov-18
24
0%
5
20-Apr-19
24-Apr-19
0
A4770
DELUGE SKID FUNCTIONAL TESTING
09-Dec-18
11-Dec-18
3
0%
3
24-Apr-19
27-Apr-19
0
A4780
PUNCH LIST
12-Dec-18
15-Dec-18
3
0%
4
28-Apr-19
01-May-19
0
A4770-1
LEAK TEST FOR SEPARATOR AND PIPING
0
0%
5
23-Apr-19
28-Apr-19
4
01-May-19 01-May-19
09-May-19 02-May-19
0 0
START OF PRODUCTION
28-Nov-18 28-Nov-18
07-Dec-18 30-Nov-18
8 3
0%
8 2
A5200
COMMISSIONING AND STARTUP
29-Nov-18
01-Dec-18
3
0%
3
02-May-19
05-May-19
0
A5210
PERFORMANCE TESTS
01-Dec-18
07-Dec-18
7
0%
4
06-May-19
09-May-19
0
27-Nov-18 27-Nov-18
16-Dec-18 29-Nov-18
16 3
0%
43 3
07-May-19 07-May-19
25-Jun-19 09-May-19
23 23
Commissioning A5190
Demolition Works Work DM1280 WORK PERMIT APPROVED FOR DEMOLITION DM1290
DEPRESSURIZATION / ISOLATION (PIPING & INSTRUMENTATION)
01-Dec-18
02-Dec-18
2
0%
2
11-May-19
12-May-19
23
DM1310
APPLY ANTI RUST TO FOUNDATION BOTLS
03-Dec-18
04-Dec-18
1
0%
2
12-May-19
13-May-19
23
DM1300
COLD CUTTING INLET AND OUTLET PIPING
04-Dec-18
08-Dec-18
3
0%
21
13-May-19
05-Jun-19
23
DM1320
UNBOLD & REMOVE EXISTING SEPARATOR
08-Dec-18
10-Dec-18
2
0%
2
05-Jun-19
06-Jun-19
23
DM1330
REMOVE CONCRETE FOUNDATION / GRADE THE AREA
10-Dec-18
16-Dec-18
5
0%
16
08-Jun-19
25-Jun-19
23
DM1340
DEMOLITION WORKS COMPLETE
16-Dec-18
0
0%
0
25-Jun-19
23
09-May-18
24-Dec-18
197
183
24-Jun-18 A
26-May-19
10
19-Jun-18 23-Jun-18 23-Jun-18
01-Aug-18 17-Jul-18 05-Jul-18
38 22 12
79 79 79
03-Sep-18 A 03-Sep-18 A 13-Sep-18 A
24-Jan-19 24-Jan-19 24-Jan-19
64 64 9
FAHM FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 41 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
F660
U3963- Updated Revised Baseline Schedule.
Page 29 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CR
23-Jun-18
05-Jul-18
12
30%
79
13-Sep-18 A
24-Jan-19
9
METERING SKID SK F670 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER
07-Jul-18 07-Jul-18
09-Jul-18 09-Jul-18
3 3
30%
79 79
13-Sep-18 A 13-Sep-18 A
24-Jan-19 24-Jan-19
9 9
PSV F680
10-Jul-18 10-Jul-18
12-Jul-18 12-Jul-18
3 3
30%
66 66
13-Sep-18 A 13-Sep-18 A
09-Jan-19 09-Jan-19
77 77
10-Jul-18 10-Jul-18
17-Jul-18 17-Jul-18
7 7
62 0
03-Sep-18 A 03-Sep-18 A
05-Jan-19 16-Sep-18 A
58
100%
FAB.OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFE
PIPE SUPPORT F700 FABRICATION OF INSTRUMENT STANCHION SUPPORTS F690
FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATI
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F730 PIPING FABRICATION & FBE COATING AT KUWAIT F760
FBE PIPING BULK DELIVER AT SITE
F730-000
PIPE DELIVER AT KUWAIT
REMAINING PIPING PI (NON FBE) F730-1 COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATIN
14-Jul-18
17-Jul-18
4
67%
62
12-Sep-18 A
05-Jan-19
51
19-Jun-18 19-Jun-18 19-Jun-18
01-Aug-18 01-Aug-18 11-Jul-18
38 38 20
0%
72 67 58
27-Sep-18 A 27-Sep-18 A 18-Oct-18 A
16-Jan-19 10-Jan-19 31-Dec-18
28 22 22
17-Jul-18
01-Aug-18
14
0%
9
01-Jan-19
10-Jan-19
22
0
100%
0
0%
42 40
06-Oct-18 A 29-Nov-18 29-Dec-18
0 0
16-Jan-19 14-Jan-19
28 28
16-Jan-19
28
FABRICATION SPOOLS DELIVER TO SITE
0
0%
17
F730-00
PIPE DELIVER AT FACILITY BY CPECC
0
100%
0
0 0
43 0
24-Jun-18 A 24-Jun-18 A
20-Dec-18
100%
METHOD STATEMENT RE SUBMISSION & APPROVED BY QP
0
100%
0
24-Jun-18 A
19-Sep-18 A
OPERATION CLEARANCE & VESSEL DEPRESSURIZATION BY QP OPERATIO
0
0%
5
01-Nov-18
06-Nov-18
3
FM-DEM-1030
PURGING / SYSTEM ISOLATE SEPERATOR FROM EXISTING SYSTEM
0
0%
7
07-Nov-18
14-Nov-18
32
FM-DEM-1040
COMPLETE DEMO WORK OF SEPARATOR & METERING SKID FOUNDATIO
0
0%
30
15-Nov-18
19-Dec-18
37
0 0 0
0%
7 5 5
07-Nov-18 07-Nov-18 07-Nov-18
14-Nov-18 12-Nov-18 12-Nov-18
3 3 3
INSTRUMENT ISOLATION I A5640 ISOLATION OF ASSOCIATED INTRUMENTS
0 0
0%
2 2
11-Nov-18 11-Nov-18
12-Nov-18 12-Nov-18
4 4
ELECTRICAL ISOLATION IS A5650 ISOLATION OF ASSOCIATED ELECTRICAL ITEMS
0 0
0%
2 2
13-Nov-18 13-Nov-18
14-Nov-18 14-Nov-18
3 3
DEMOLITION WORKS W DEMOLITION O OF EXISTING PIPING A5660 REMOVAL OF EXISITNG PIPING WITH SEPARATOR
0 0 0
0%
32 7 7
14-Nov-18 14-Nov-18 14-Nov-18
20-Dec-18 21-Nov-18 21-Nov-18
37 3 3
0 0
0%
6 3
19-Nov-18 19-Nov-18
25-Nov-18 21-Nov-18
7 3
0
A5680
REMOVAL OF SEPARTOR FROM EXISTING LOGIC
DISMANTLING OF EXISTING SEPARATOR A5690 APPLICATION OF ANTI-RUST PAINT/COATING
0%
5
20-Nov-18
25-Nov-18
7
0 0
0%
4 2
25-Nov-18 25-Nov-18
28-Nov-18 26-Nov-18
4 3
A5700
UNBOLTING OF SEPARATOR FROM FOUNDATION
0
0%
2
25-Nov-18
26-Nov-18
4
A5710
LIFITNG AND REMOVAL FROM FOUNDATION
0
DISMANTLING OF EXISTING SEPARATOR PLATFORM A5750 APPLICATION OF ANTI-RUST PAINT/COATING
0%
2
27-Nov-18
28-Nov-18
4
0 0
0%
5 1
26-Nov-18 26-Nov-18
01-Dec-18 26-Nov-18
3 3
A5760
UNBOLTING OF PLATFORM FROM FOUNDATION
0
0%
2
26-Nov-18
27-Nov-18
3
A5770
LIFTING AND REMOVAL FROM FOUNDATION
0
0%
4
27-Nov-18
01-Dec-18
3
0 0
0%
5 1
27-Nov-18 27-Nov-18
02-Dec-18 27-Nov-18
16 16
DISMANTLING OF EXISTING METERING SKID A5720 APPLICATION OF ANTI-RUST PAINT/COATING A5730
UNBOLTING FROM FOUNDATION
0
0%
2
27-Nov-18
28-Nov-18
16
A5740
LIFTING AND REMOVAL FROM FOUNDATION
0
0%
2
01-Dec-18
02-Dec-18
16
0 0
0%
8 2
27-Nov-18 27-Nov-18
05-Dec-18 28-Nov-18
16 17
DISMANTLING OF EXISTING METERING SKID PLATFORM A5780 APPLICATION OF ANTI-RUST PAINT/COATING A5790
UNBOLTING OF PLATFORM FROM FOUNDATION
0
0%
3
27-Nov-18
29-Nov-18
17
A5800
LIFTING AND REMOVAL FROM FOUNDATION
0
0%
4
02-Dec-18
05-Dec-18
16
0 0
0%
8 2
27-Nov-18 27-Nov-18
05-Dec-18 28-Nov-18
43 46
DISMANTLING OF EXISTING PSV PLATFORM A5810 APPLICATION OF ANTI-RUST PAINT/COATING A5820
UNBOLTING OF PLATFORM FROM FOUNDATION
0
0%
3
27-Nov-18
29-Nov-18
46
A5830
LIFTING AND REMOVAL FROM FOUNDATION
0
0%
2
04-Dec-18
05-Dec-18
43
0%
17 17
02-Dec-18 02-Dec-18
20-Dec-18 20-Dec-18
3 3
DEMOLITION OF O EXISITNG SEPARATOR FOUNDATION A5840 EXISTING SEPARATOR FOUNDATION DEMOLITION
0 0
M 4
2017 J Jul A 5 6 7
S 8
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
37
FM-DEM-1020
DEMOLITION O OF EXISTING INSTRUMENTATION A5670 REMOVAL OF EXISITNG INTRUMENTS AND CABLES WITH SEPARATOR
A 3
06-Oct-18 A
FM-DEM-1010
ISOLATION WORKS WOR PIPING ISOLATION ISOLAT A5630 ISOLATION OF EXISTING VALVES
M 2
17:46
27-Sep-18 A
F760-1
ISOLATION AND DEMOLITION WORKS FM-DEM-1000 ISSUE METHOD STATEMENT FOR ISOLATION & DEMOLTION WORK OF SE
F 1
29-Nov-18
Page 42 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
DEMOLITION OF O EXISTING METERING SKID FOUNDATION A5850 EXISTING FOUNDATION DEMOLITION
0 0
0%
8 8
06-Dec-18 06-Dec-18
15-Dec-18 15-Dec-18
16 16
DEMOLITION O OF EXISTING PSV FOUNDATION A5860 EXISTING FOUNDATION DEMOLITION
0 0
0%
7 7
06-Dec-18 06-Dec-18
13-Dec-18 13-Dec-18
43 43
04-Aug-18 A 04-Aug-18 A 14-Sep-18 A 14-Sep-18 A
26-May-19 26-May-19 26-May-19 15-Nov-18
10 10 10 10
INSTALLATION Civil Works COMMOMN A2230
GRADING
BL1 Start
BL1 Finish
Page 30 of32
09-May-18 09-May-18 09-May-18 09-May-18
24-Dec-18 24-Dec-18 24-Dec-18 20-May-18
197 197 197 10
0%
183 183 169 5
A2300
CABLE TRENCHES AND UTILITY ROAD CROSSINGS
09-Jul-18
01-Aug-18
21
0%
25
04-Dec-18
01-Jan-19
29
A2290
ROADS AND PAVING(INCLUDING MODIFICATIONS)
22-Nov-18
08-Dec-18
14
0%
16
18-Apr-19
07-May-19
10
A2310
DRAINAGE PIPE CULVERTS
22-Nov-18
08-Dec-18
14
0%
25
22-Jan-19
19-Feb-19
10
A2320
ROAD SAFETY CRASH BARRIERS AND BOLLARD
22-Nov-18
16-Dec-18
21
0%
16
07-May-19
26-May-19
10
A2350
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
17-Dec-18
24-Dec-18
7
0%
16
07-May-19
26-May-19
10
A2230-1
PROTECTION OF UNDERGROUND CABLES
0
0%
14
26-Dec-18
10-Jan-19
10
A2280-3
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPL
0
0%
21
25-Nov-18
18-Dec-18
107
28 28
0%
47 15
20-Dec-18 20-Dec-18
12-Feb-19 06-Jan-19
3 3
TEST SEPERATOR SEPERAT A2240 EXCAVATION
29-May-18 29-May-18
30-Jun-18 30-Jun-18
A2240-2
CURING
0
0%
8
26-Jan-19
03-Feb-19
3
A2240-1
FOUNDATION (STEEL FIXING)
0
0%
15
06-Jan-19
22-Jan-19
3
A2240-11
FOUNDATION (CONCRETE)
0
0%
11
19-Jan-19
30-Jan-19
3
A2250
BLINDING
0
0%
6
02-Jan-19
08-Jan-19
3
A2270
FORMWORK FOR FOUNDATION
0
0%
8
14-Jan-19
22-Jan-19
3
A2240-22
WATER PROOFING (BITUMEN COATING)
0
0%
9
29-Jan-19
07-Feb-19
3
A2240-32
BACKFILL
0
0%
9
03-Feb-19
12-Feb-19
3
0 0
01-Jan-19 01-Jan-19
25-Feb-19 26-Jan-19
27 27
11-Feb-19
18-Feb-19
27
0%
48 22
A2240-82
CURING
0
0%
7
A2240-62
FOUNDATION (STEEL FIXING)
0
0%
15
22-Jan-19
07-Feb-19
27
A2240-72
FOUNDATION (CONCRETE)
0
0%
9
06-Feb-19
16-Feb-19
27
A5880
BLINDING
0
0%
9
22-Jan-19
31-Jan-19
27
A5890
FORMWORK FOR FOUNDATION
0
0%
7
31-Jan-19
07-Feb-19
27
A2240-42
WATER PROOFING (BITUMEN COATING)
0
0%
7
16-Feb-19
23-Feb-19
27
A2240-52
BACKFILL
0
0%
7
18-Feb-19
25-Feb-19
27
0 0
0%
34 12
30-Dec-18 30-Dec-18
06-Feb-19 12-Jan-19
4 4
TEST SEPERAT SEPERATOR PLATFORM A5900 EXCAVATION
METERING SKID SK A2240-12 EXCAVATION A2240-92
BLINDING
0
0%
7
01-Jan-19
08-Jan-19
4
A2240-102
FOUNDATION (STEEL FIXING)
0
0%
9
05-Jan-19
14-Jan-19
4
A2240-112
FOUNDATION (CONCRETE)
0
0%
9
12-Jan-19
21-Jan-19
4
A2240-122
FORMWORK FOR FOUNDATION
0
0%
5
09-Jan-19
14-Jan-19
4
A2240-132
CURING
0
0%
7
21-Jan-19
28-Jan-19
4
A2240-142
WATERPROOFING (BITUMEN COATING)
0
0%
3
28-Jan-19
30-Jan-19
4
A2240-152
BACKFILL
0
PIPE SUPPORT A2260 FOUNDATION WORK (STEEL FIXING)
01-Jul-18 01-Jul-18
24-Jul-18 24-Jul-18
0%
7
30-Jan-19
06-Feb-19
4
21 21
0%
64 26
04-Aug-18 A 13-Nov-18
07-Jan-19 12-Dec-18
7 0
A2235-4
EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS
0
60%
26
04-Aug-18 A
24-Nov-18
0
A2260-1
FOUNDATION WORK (CONCRETE)
0
0%
26
21-Nov-18
20-Dec-18
0
A2260-2
CURING
0
0%
26
24-Nov-18
23-Dec-18
0
A2260-3
BLINDING CONCRETE FOR PS FOUNDATIONS
0
0%
25
07-Nov-18
05-Dec-18
0
A2260-4
FORMWORK FOR FOR PS FOUNDAITON
0
0%
20
20-Nov-18
12-Dec-18
0
A2260-5
WATER PROOFING (BITUMENT COATING)
0
0%
20
09-Dec-18
31-Dec-18
7
A2260-6
BACKFILLING
0
0%
20
16-Dec-18
07-Jan-19
7
7 7
0%
55 15
20-Dec-18 06-Jan-19
21-Feb-19 22-Jan-19
38 38
PSV A2280
FOUNDATION WORK (STEEL FIXING)
25-Jul-18 25-Jul-18
01-Aug-18 01-Aug-18
A2235-5
EXCAVATION (INCLUDING AREA LIGHTING POLES)
0
0%
15
20-Dec-18
06-Jan-19
38
A2280-1
FOUNDATION WORK (CONCRETE)
0
0%
15
22-Jan-19
07-Feb-19
38
A2280-2
CURING / WATERPROOFING / BACK FILLING
0
0%
13
07-Feb-19
21-Feb-19
38
76
24-Dec-18
21-Mar-19
44
Structural Steel
29-Oct-18
17-Nov-18
17
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 43 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule.
Page 31 of32
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
29-Oct-18 29-Oct-18
05-Nov-18 05-Nov-18
7 7
0%
21 21
26-Feb-19 26-Feb-19
21-Mar-19 21-Mar-19
27 27
0
0%
21
26-Feb-19
21-Mar-19
27
METERING SKID SK A2740 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK W
01-Nov-18 01-Nov-18
06-Nov-18 06-Nov-18
5 5
0%
12 12
04-Feb-19 04-Feb-19
17-Feb-19 17-Feb-19
4 4
PSV A2750
05-Nov-18 05-Nov-18
10-Nov-18 10-Nov-18
5 5
0%
11 11
25-Feb-19 25-Feb-19
09-Mar-19 09-Mar-19
38 38
11-Nov-18 11-Nov-18
13-Nov-18 13-Nov-18
3 3
0%
28 28
24-Dec-18 24-Dec-18
24-Jan-19 24-Jan-19
92 0
0
0%
15
24-Dec-18
09-Jan-19
105
TEST SEPERATOR SEPERAT A2730 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PL A2730-1
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
INSTALLATION OF PSV VALVES ACCESS PLATFORMS
PIPE SUPPORT A2760 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS A2760-1
MODIFICATIONS OF EXISTING PIPE SUPORT / ACCESS PLATFORMS
FIELD INSTRUMENT INSTRUM A2770 INSTALLATION OF INSTRUMENT STANCHION Mechanical A2900
INSTALLATION OF NEW TEST SEPARATOR
Piping PIPE INSTALATION INSTALAT & Pre Shutdown WORKS A3230 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT
14-Nov-18 14-Nov-18
17-Nov-18 17-Nov-18
3 3
0%
5 5
26-Jan-19 26-Jan-19
30-Jan-19 30-Jan-19
41 41
11-Oct-18 11-Oct-18
28-Oct-18 28-Oct-18
15 15
0%
4 4
07-Feb-19 07-Feb-19
11-Feb-19 11-Feb-19
3 3
02-Oct-18 02-Oct-18 02-Oct-18
29-Nov-18 17-Nov-18 17-Oct-18
51 40 14
0%
69 62 20
02-Feb-19 02-Feb-19 02-Feb-19
22-Apr-19 14-Apr-19 24-Feb-19
0 1 0
A3240
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
29-Oct-18
05-Nov-18
7
0%
6
06-Apr-19
11-Apr-19
3
A3250
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
06-Nov-18
08-Nov-18
3
0%
11
25-Mar-19
06-Apr-19
0
A3260
PIPING TIE-IN / NDT PRE SHUT DOWN
10-Nov-18
17-Nov-18
7
0%
6
08-Apr-19
14-Apr-19
0
A3260-a
MOBILIZATION OF OF TEAM APPLY PTW
0
0%
1
06-Apr-19
06-Apr-19
0
A3260-b
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
0
0%
7
06-Apr-19
13-Apr-19
0
A3230-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
9
07-Feb-19
17-Feb-19
48
MOBILIZATION OF HOT TAPPING SUB CONTRACTOR
10-Nov-18 10-Nov-18
29-Nov-18 12-Nov-18
18 3
0%
23 3
11-Mar-19 11-Mar-19
06-Apr-19 13-Mar-19
1 1
HT1170
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
13-Nov-18
24-Nov-18
10
0%
8
14-Mar-19
23-Mar-19
1
HT1180
HOT TAPPING / NDT
25-Nov-18
27-Nov-18
3
0%
6
24-Mar-19
30-Mar-19
1
HT1190
HOT TAPPING COMPLETE / REMOVE SCAFFOLD
28-Nov-18
29-Nov-18
2
0%
3
03-Apr-19
06-Apr-19
1
10-Nov-18 10-Nov-18
12-Nov-18 12-Nov-18
3 3
0%
7 2
15-Apr-19 21-Apr-19
22-Apr-19 22-Apr-19
0 0
0
0%
7
15-Apr-19
22-Apr-19
0
HOT TAPPING HT1160
Plant Shutdown Tie-in A3261 REPLACE THE SHUTVALVE AT POINT OF OIL-IN TIE-IN / INSTALL SDV A3260-1
PIPING TIE-IN / NDT SHUT DOWN CABLE GLANDING AND TERMINATION
21-May-18 21-May-18
19-Nov-18 05-Jun-18
157 14
0%
93 9
03-Dec-18 21-Feb-19
20-Mar-19 03-Mar-19
4 5
A3840
CABLE TRAY INSTALLATION
29-May-18
13-Jun-18
14
0%
13
17-Feb-19
03-Mar-19
4
A3830
U/G CABLE LAYING
06-Jun-18
13-Jun-18
7
0%
9
13-Feb-19
23-Feb-19
5
A3850
ELECTRICAL EQUIPMENTS INSTALLATION
21-Oct-18
28-Oct-18
7
0%
17
21-Feb-19
12-Mar-19
4
A3860
CABLE LAYING
29-Oct-18
05-Nov-18
7
0%
10
20-Feb-19
03-Mar-19
4
A3870
LIGHTING INSTALLATION
29-Oct-18
05-Nov-18
7
0%
7
05-Mar-19
12-Mar-19
4
A3880
ELECTRICAL TIE-INS
06-Nov-18
13-Nov-18
7
0%
3
14-Mar-19
17-Mar-19
4
A3890
ENERGIZATION
14-Nov-18
19-Nov-18
5
0%
4
17-Mar-19
20-Mar-19
4
A3830-1
BACK FILLING OF CABLE TRENCH
0
0%
8
23-Feb-19
03-Mar-19
5
A3890-1
HOOK UP
0
0%
3
12-Mar-19
14-Mar-19
4
A3940
EARTH PIT DRILLING
0
0%
5
19-Jan-19
23-Jan-19
5
A6530
CABLE TRENCHES
0
0%
21
03-Dec-18
26-Dec-18
10
Electrical A3820
Instrument & Control Co A4260 CABLE TRAY AND SUPPORT INSTALLATION
13-Oct-18 13-Oct-18
27-Nov-18 28-Oct-18
40 14
0%
40 16
16-Feb-19 16-Feb-19
02-Apr-19 05-Mar-19
2 2
05-Nov-18
7
0%
4
30-Mar-19
02-Apr-19
2
A4270
INSTRUMENT EQUIPMENT CALIBRATION/ LOOP TEST
29-Oct-18
A4920
DCS MODIFICATION IN CONTROL ROOM BY VENDOR
29-Oct-18
11-Nov-18
12
0%
10
19-Mar-19
30-Mar-19
2
A5000
JB SUPPORT INSTALLATION
31-Oct-18
02-Nov-18
3
0%
3
03-Mar-19
05-Mar-19
2
A5050
CABLE GLANDING AND TERMINATION (ALONG JBs)
04-Nov-18
06-Nov-18
3
0%
10
09-Mar-19
19-Mar-19
2
A4280
INSTRUMENT EQUIPEMNT INSTALLATION (RO, CONTROL VALVE, PRV, SDV
06-Nov-18
13-Nov-18
7
0%
9
11-Mar-19
20-Mar-19
2
A5060
CABLE GLAND AND TERMINATION (ALONG INSTRUMENTS)
06-Nov-18
09-Nov-18
3
0%
6
18-Mar-19
24-Mar-19
4
A4290
INSTRUMENT CABLE LAYING
14-Nov-18
19-Nov-18
5
0%
17
28-Feb-19
19-Mar-19
2
A5340
INSTALLATION OF DELUGE
20-Nov-18
27-Nov-18
7
0%
9
11-Mar-19
20-Mar-19
5
A4290-1
SS TUBE AND LEAK TEST
0
0%
3
19-Mar-19
21-Mar-19
5
A4280-1
INSTALLATION OF INSTRUMENT VALVE
0
0%
3
16-Mar-19
18-Mar-19
3
A4280-2
FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)
0
0%
7
11-Mar-19
18-Mar-19
3
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 44 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Updated Revised Baseline Schedule. BL1 Start
BL1 Finish
Page 32 of32
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
3
A4280-3
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
3
16-Mar-19
18-Mar-19
A5040
JB INSTALLATION
0
0%
3
06-Mar-19
09-Mar-19
2
28-Feb-19 02-Mar-19
28-Mar-19 05-Mar-19
21 38
F&G SUPPORT INSTALLATION
0 0
0%
25 4
A6460
F&G DEVICES INSTALLATION
0
0%
4
05-Mar-19
09-Mar-19
38
A6440
F&G CABLE INSTALLATION
0
0%
9
28-Feb-19
10-Mar-19
37
A6470
F&G JB SUPPORT INSTALLATION
0
0%
2
06-Mar-19
07-Mar-19
39
A6480
F&G JB INSTALLATION
0
0%
2
09-Mar-19
10-Mar-19
37
A6490
F&G CABLE GLANDING AND TERMINATION
0
0%
5
19-Mar-19
24-Mar-19
21
A6500
F&G LOOP PREPARATION
0
0%
2
24-Mar-19
25-Mar-19
21
A6510
F&G LOOP TESTING
0
F&G System A6450
Painting & Fireproofing Firep A4490 PIPING PAINTING AND TOUCH-UP
0%
4
25-Mar-19
28-Mar-19
21
10-Nov-18 10-Nov-18
03-Dec-18 17-Nov-18
21 7
0%
18 9
19-Mar-19 27-Mar-19
08-Apr-19 06-Apr-19
3 4
A4480
STRUCTURAL STEEL PAINTING AND TOUCH-UP
18-Nov-18
25-Nov-18
7
0%
10
19-Mar-19
30-Mar-19
3
A4500
FIREPROOFING FOR STRUCTURAL STEEL
26-Nov-18
03-Dec-18
7
0%
13
25-Mar-19
08-Apr-19
3
10-Nov-18 10-Nov-18
08-Dec-18 17-Nov-18
25 7
17%
173 135
27-Sep-18 A 27-Sep-18 A
14-May-19 31-Mar-19
0 18
Pre-commisionin Pre-commisioning A4810 PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING A4850
INST LOOP AND FUNCITONAL TESTING
10-Nov-18
08-Dec-18
25
0%
4
23-Apr-19
27-Apr-19
0
A4820
ELECTRICAL LIGHITING TEST
13-Nov-18
15-Nov-18
3
0%
5
28-Apr-19
02-May-19
0
A4830
LEAK TEST FOR SEPARATOR AND PIPING
28-Nov-18
01-Dec-18
3
0%
4
06-May-19
11-May-19
0
A4840
PUNCHLIST
02-Dec-18
04-Dec-18
3
0%
2
12-May-19
14-May-19
0
A4820-1
DELUGE SKID FUNCTIONAL TESTING
0 17-Dec-18
START OF PRODUCTION
08-Dec-18 08-Dec-18
A5260
COMMISSIONING AND STARTUP
09-Dec-18
A5270
PERFORMANCE TESTS
12-Dec-18
Commissioning A5250
As Built and Final Dossier A5290
FINAL PUNCH LIST AND CLOSE OUT DOCUMENTATION
0%
2
04-May-19
05-May-19
0
8 3
15-May-19 15-May-19
22-May-19
0%
7 0
0 0
12-Dec-18
3
0%
3
15-May-19
18-May-19
0
17-Dec-18
7
0%
3
19-May-19
22-May-19
0
17-Dec-18
18-Feb-19
54
53
22-May-19
22-Jul-19
0
17-Dec-18
18-Feb-19
54
53
22-May-19
22-Jul-19
0
0%
F 1
M 2
A 3
M 4
2017 J Jul A 5 6 7
29-Nov-18 S 8
17:46
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 45 of 170
PROJECT PLANNING PACKAGE
Attachment 2
CRITICAL PATH
Page 46 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
Rev-D by TA E EPIC for Replacement of Old 3-Phase Test Separators at All
U3963- Critical Activities TF>5 BL1 Start
BL1 Finish
BL1 Duration
27-Sep-17
18-Feb-19
544
08-Oct-18
Phy. % Com.
Page 1 of11
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
290
06-Feb-18 A
22-Jul-19
0
152
26-Jan-19
18-Feb-19
115
22-Jul-19
0
DE3380
ALL WORKS COMPLETE - MS1
18-Dec-18
0
0%
0
22-May-19*
0
DE1010
ACHIEVED - SCHEDULE COMPLETE
18-Feb-19
0
0%
0
22-Jul-19*
0
08-Dec-18
52
Milestone
08-Oct-18
Construction
08-Oct-18
26-Jan-19
22-May-19
0
0 0
0 0
22-Apr-19
0%
22-Apr-19 22-Apr-19
0 0
08-Dec-18 08-Oct-18
52 0
100 0
26-Jan-19
0%
22-May-19 27-Jan-19*
0 0
Fahahil Main Tie-ins Tie A1460 SHUTDOWN TIE-INS Commissioninng A1260 COMPLETE OF COMMISSIONING AT KHATIYAH MAIN
100
A1270
COMPLETE OF COMMISSIONING AT KHATIYAH NORTH
30-Oct-18
0
0%
0
29-Jan-19*
0
A1280
COMPLETE OF COMMISSIONING AT KHATIYAH SOUTH
10-Nov-18
0
0%
0
26-Jan-19*
0
A1290
COMPLETE OF COMMISSIONING AT JALM
17-Nov-18
0
0%
0
06-Apr-19*
0
A1300
COMPLETE OF COMMISSIONING AT FAHAHIL SOUTH
26-Nov-18
0
0%
0
20-May-19*
0
A1320
COMPLETE OF COMMISSIONING AT FAHAHIL MAIN
26-Nov-18
0
0%
0
22-May-19*
0
A1310
COMPLETE OF COMMISSIONING AT FAHAHIL NORTH
08-Dec-18
0
0%
0
09-May-19*
0
18-Feb-19
0
22-Jul-19
0
18-Feb-19
0
22-Jul-19
0
27-Sep-17
09-May-18
224
99
23-Feb-18 A
31-Jan-19
0
27-Sep-17
09-May-18
224
99
23-Feb-18 A
31-Jan-19
0
27-Sep-17 27-Sep-17 27-Sep-17
09-May-18 22-Mar-18 22-Mar-18
224 176 220
90%
99 64 64
23-Feb-18 A 01-Apr-18 A 01-Apr-18 A
31-Jan-19 27-Dec-18 27-Dec-18
0 4 4
22-Mar-18
0
0%
0
09-May-18 09-May-18
224 280
55%
99 99
0%
18-Feb-19
Final documentation documenta & As Built / Handover A1250
FINAL DOCUMENTATION / HANDOVER DOSSIER
Procurement EQUIPMENTS Safety Fire Fighting Equipments Eq PC1500 MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-FIRE FIGHTING EQUIP PC1510 Deludge Skid PC1050 PC1060
DELIVERED AT SITE- FIRE FIGHTING EQUIPMENTS MANUFACTURING ( VENDOR DOC, PIM, MANUFAC, SHIP)-DELUDGE SKID
27-Sep-17 27-Sep-17
DELIVERED AT SITE-DELUDGE SKID -1st LOT (Khatiya Stations)
0 0%
22-Jul-19
0
27-Dec-18
4
23-Feb-18 A 23-Feb-18 A
31-Jan-19 31-Jan-19
0 0
09-May-18
0
31-Dec-18
0
30-Dec-17
18-Dec-18
380
225
06-Feb-18 A
22-May-19
0
01-Feb-18
19-Nov-18
250
80
06-Feb-18 A
26-Jan-19
0
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F220 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS
25-Feb-18 26-Feb-18 26-Feb-18 26-Feb-18
29-Mar-18 14-Mar-18 11-Mar-18 11-Mar-18
29 15 12 12
95%
43 14 10 10
06-Feb-18 A 06-Feb-18 A 16-Aug-18 A 16-Aug-18 A
13-Dec-18 10-Nov-18 05-Nov-18 05-Nov-18
0 3 0 0
PIPE SUPPORT F230 FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATION
12-Mar-18 12-Mar-18
14-Mar-18 14-Mar-18
3 3
98%
14 14
06-Feb-18 A 06-Feb-18 A
10-Nov-18 10-Nov-18
3 3
25-Feb-18 25-Feb-18 25-Feb-18
29-Mar-18 29-Mar-18 29-Mar-18
29 29 29
0%
43 43 34
08-Oct-18 A 08-Oct-18 A 08-Oct-18 A
13-Dec-18 13-Dec-18 03-Dec-18
0 0 0
0
0%
9
04-Dec-18
13-Dec-18
0
0 0
0%
26 26
21-Oct-18 A 21-Oct-18 A
24-Nov-18 24-Nov-18
3 3
0%
66 66 66 20
06-Aug-18 A 06-Aug-18 A 06-Aug-18 A 08-Dec-18
09-Jan-19 09-Jan-19 09-Jan-19 30-Dec-18
5 5 5 5
CONSTRUCTION WORKS KAHS
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F290 PIPING FABRICATION & FBE COATING AT KUWAIT F320-2
FBE PIPING BULK DELIVER AT SITE
REMAINING PIPING PI (NON - FBE) F290-1 COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATING
0
DRAINAGE PIPE CULVERTS
01-Feb-18 27-Oct-18 27-Oct-18 27-Oct-18
19-Nov-18 19-Nov-18 19-Nov-18 11-Nov-18
250 21 21 14
A1780
UTILITY ROAD CROSSINGS
27-Oct-18
19-Nov-18
21
0%
26
11-Dec-18
09-Jan-19
5
A1780-2
CABLE TRENCHES
0
35%
25
24-Sep-18 A
22-Nov-18
2
A1710-1
PROTECTION OF UNDERGROUND CABLES
0
90%
25
14-Sep-18 A
22-Nov-18
5
A1715-6
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPLICAB
0
98%
8
06-Aug-18 A
03-Nov-18
2
10%
24 24 24
27-Sep-18 A 27-Sep-18 A 27-Sep-18 A
21-Nov-18 21-Nov-18 21-Nov-18
0 0 0
INSTALLATION Civil Works COMMON A1790
Structural Steel TEST SEPERATOR SEPERAT A2480 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PLATF Primary Baseline Actual Work Remaining Work Critical Remaining Work Baseline Milestone Milestone
3963-Rev-D.-1
20-Aug-18 20-Aug-18 20-Aug-18
27-Aug-18 27-Aug-18 27-Aug-18
7 7 7
Page 1 of 11
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
F M 1 2
A 3
M 4
29-Nov-18 2017 J Jul A 5 6 7
Date 29-Nov-18
S 8
17:49
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
U-3963_REV-D Revision
Checked
Approved
Critical Path
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan U3963- Critical Activities TF>5
Page 47 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
Piping STATION PIPING PIPIN A3020 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT
U3963- Critical Activities TF>5 BL1 Start
BL1 Finish
BL1 Duration
09-Aug-18 09-Aug-18 09-Aug-18
17-Sep-18 17-Sep-18 01-Sep-18
Page 2 of11
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
34 34 20
0%
22 22 18
16-Dec-18 16-Dec-18 16-Dec-18
09-Jan-19 09-Jan-19 05-Jan-19
4 4 0
A3030
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
20-Aug-18
26-Aug-18
6
0%
4
06-Jan-19
09-Jan-19
4
A3040
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
02-Sep-18
05-Sep-18
4
0%
12
24-Dec-18
06-Jan-19
3
A3050
TIE-IN
06-Sep-18
17-Sep-18
10
0%
4
06-Jan-19
09-Jan-19
0
A3020-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
9
24-Dec-18
02-Jan-19
0
A3051-1
REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV
0
0%
3
07-Jan-19
09-Jan-19
3
U/G CABLE LAYING
01-Feb-18 01-Feb-18
13-Oct-18 08-Feb-18
218 7
0%
52 5
08-Nov-18 29-Nov-18
07-Jan-19 04-Dec-18
5 5
A3470
CABLE TRAY INSTALLATION
28-Aug-18
12-Sep-18
14
0%
8
22-Nov-18
01-Dec-18
0
A3480
ELECTRICAL EQUIPMENTS INSTALLATION
13-Sep-18
20-Sep-18
7
0%
10
09-Dec-18
19-Dec-18
5
A3490
CABLE LAYING
22-Sep-18
29-Sep-18
7
0%
8
02-Dec-18
10-Dec-18
5
A3500
LIGHTING FIXTURE AND DB INSTALLATION
22-Sep-18
29-Sep-18
7
0%
8
16-Dec-18
24-Dec-18
5
A3510
ELECTRICAL TIE-INS
30-Sep-18
07-Oct-18
7
0%
2
03-Jan-19
05-Jan-19
5
A3520
ENERGIZATION
08-Oct-18
13-Oct-18
5
0%
3
05-Jan-19
07-Jan-19
5
A3460-1
BACK FILLING OF CABLE TRENCH
0
0%
9
02-Dec-18
11-Dec-18
5
A3510-1
HOOK UP
0
0%
4
25-Dec-18
29-Dec-18
5
A3530
EARTH PIT DRILLING
0
0%
4
08-Nov-18
12-Nov-18
0
13-Nov-18 25-Dec-18
08-Jan-19 05-Jan-19
0 0
Electrical A3460
Instrument & Control Co A4090 DCS MODIFICATION IN CONTROL ROOM BY VENDOR
20-Aug-18 20-Aug-18
17-Nov-18 02-Sep-18
77 12
0%
49 10
A4050
CABLE TRAY AND SUPPORTS INSTALLATION
01-Sep-18
16-Sep-18
14
0%
17
13-Nov-18
02-Dec-18
0
A4060
INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING
17-Sep-18
24-Sep-18
7
0%
4
05-Jan-19
08-Jan-19
0
A4070
INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, RELIEF VALVE & CONTROL
25-Sep-18
02-Oct-18
7
0%
6
20-Dec-18
26-Dec-18
0
A4080
SS TUBING AND LEAK TEST
03-Oct-18
08-Oct-18
5
0%
4
01-Jan-19
05-Jan-19
0
A5300
INSTALLATION OF DELUGE
09-Oct-18
16-Oct-18
7
0%
7
01-Jan-19
08-Jan-19
0
A4640
JB SUPPORT INSTALLATION
21-Oct-18
23-Oct-18
3
0%
4
02-Dec-18
05-Dec-18
0
A4740
JB INSTALLATION
14-Nov-18
17-Nov-18
3
0%
3
04-Dec-18
06-Dec-18
0
A4080-1
INSTRUMENT CABLE LAYING
0
0%
17
05-Dec-18
24-Dec-18
0
A4080-11
CABLE GLANDS AND TERMINATION (ALONG JBs)
0
0%
10
24-Dec-18
03-Jan-19
0
15-Dec-18 15-Dec-18
06-Jan-19 27-Dec-18
4 4
Painting & Fireproofing Firep A4360 STRUCTURAL STEEL PAINTING AND TOUCH-UP
28-Aug-18 28-Aug-18
13-Sep-18 04-Sep-18
15 7
0%
20 12
A4380
FIREPROOFING FOR STRUCTURAL STEEL
05-Sep-18
12-Sep-18
7
0%
16
19-Dec-18
06-Jan-19
4
A4370
PIPING PAINTING AND TOUCH-UP
06-Sep-18
13-Sep-18
7
0%
4
24-Dec-18
27-Dec-18
4
06-Sep-18 06-Sep-18
25-Oct-18 09-Sep-18
43 3
0%
11 3
06-Jan-19 06-Jan-19
17-Jan-19 08-Jan-19
1 0
Pre-commisionin Pre-commisioning A3051 INST LOOP AND FUNCTIONAL TEST A4650
DELUGE SKID FUNCTIONAL TESTING
02-Oct-18
25-Oct-18
21
0%
5
09-Jan-19
14-Jan-19
4
A4620
ELECTRICAL LIGHITING TEST
06-Oct-18
08-Oct-18
3
0%
5
08-Jan-19
13-Jan-19
0
A4630
PUNCHLIST
17-Oct-18
20-Oct-18
3
0%
4
14-Jan-19
17-Jan-19
0
A4620-1
LEAK TEST FOR PIPING AND SEPARATOR
0
0%
5
08-Jan-19
13-Jan-19
0
7 3
17-Jan-19 17-Jan-19
26-Jan-19
0%
8 0
0 0
3
0%
4
17-Jan-19
21-Jan-19
0
0%
09-Nov-18
START OF PRODUCTION
01-Nov-18 01-Nov-18
A5020
COMMISSIONING AND STARTUP
01-Nov-18
04-Nov-18
A5030
PERFORMANCE TESTS
04-Nov-18
09-Nov-18
7
4
22-Jan-19
26-Jan-19
0
24-Jan-18
18-Dec-18
282
83
09-May-18 A
29-Jan-19
0
24-Jan-18 24-Jan-18 24-Jan-18 24-Jan-18
14-Feb-18 14-Feb-18 10-Feb-18 10-Feb-18
19 19 15 15
90%
38 17 17 17
09-May-18 A 09-May-18 A 19-Sep-18 A 19-Sep-18 A
08-Dec-18 13-Nov-18 13-Nov-18 13-Nov-18
3 3 3 3
11-Feb-18 11-Feb-18
14-Feb-18 14-Feb-18
4 4
99%
17 17
09-May-18 A 09-May-18 A
13-Nov-18 13-Nov-18
0 0
0 0 0
0%
37 37 33
27-Oct-18 27-Oct-18 27-Oct-18
08-Dec-18 08-Dec-18 03-Dec-18
3 3 3
0
0%
13
24-Nov-18
08-Dec-18
3
68 47 34
02-Oct-18 A 02-Oct-18 A 02-Oct-18 A
12-Jan-19 18-Dec-18 03-Dec-18
3 3 3
Commissioning A5010
KAHN FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F110 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS PIPE SUPPORT F120 COMPLETE FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INS Piping Fabrication Fabricati REMAINING PIPING PI ( NON FBE) F180-1 COMPLETE PIPING FABRICATION . HYDROTEST/ PAINTING & COATING F210-1
FABRICATION SPOOLS DELIVER TO SITE
INSTALLATION Structural Steel TEST SEPERATOR SEPERAT
07-Jul-18 16-Jul-18 16-Jul-18
18-Dec-18 24-Jul-18 23-Jul-18
142 8 7
F M 1 2
A 3
M 4
29-Nov-18 2017 J Jul A 5 6 7
S 8
17:49
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 48 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
A2360
INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PLATF
U3963- Critical Activities TF>5 BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
16-Jul-18
23-Jul-18
7
METERING SKID SK A2360-1 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK WAY O PIPE SUPPORT A2370 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS OF
Page 3 of11
19-Jul-18 19-Jul-18
24-Jul-18 24-Jul-18
FIELD INSTRUMENT INSTRUM A2370-1 INSTALLATION OF INSTRUMENT STANCHION
15%
34
02-Oct-18 A
03-Dec-18
3
0 0
15%
37 37
04-Oct-18 A 04-Oct-18 A
06-Dec-18 06-Dec-18
3 3
5 5
0%
47 47
11-Oct-18 A 11-Oct-18 A
18-Dec-18 18-Dec-18
0 0
0 0
0%
4 4
15-Dec-18 15-Dec-18
18-Dec-18 18-Dec-18
3 3
10-Dec-18 10-Dec-18 10-Dec-18
06-Jan-19 06-Jan-19 29-Dec-18
4 4 0
0%
24 24 17
A2930
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
14-Aug-18
19-Aug-18
5
0%
4
02-Jan-19
06-Jan-19
0
A2950
TIE-IN
14-Aug-18
21-Aug-18
7
0%
4
02-Jan-19
06-Jan-19
0
A2920-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
8
19-Dec-18
27-Dec-18
0
A2951-1
REPLACE THE SHUTVALVET POINT OF OIL-IN TIE-IN / INSTALL SDV
0
0%
3
03-Jan-19
06-Jan-19
4
13-Nov-18 06-Dec-18
12-Jan-19 20-Dec-18
3 3
Piping PIPING -REMAINING -REMA A2920 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT
07-Jul-18 07-Jul-18 07-Jul-18
21-Aug-18 21-Aug-18 09-Aug-18
40 40 30
U/G CABLE LAYING
16-Jul-18 16-Jul-18
08-Sep-18 23-Jul-18
47 7
0%
52 13
A3290
CABLE TRAY INSTALLATION
24-Jul-18
08-Aug-18
14
0%
8
06-Dec-18
15-Dec-18
3
A3300
ELECTRICAL EQUIPMENTS INSTALLATION
09-Aug-18
16-Aug-18
7
0%
12
18-Dec-18
31-Dec-18
3
A3310
CABLE LAYING
18-Aug-18
25-Aug-18
7
0%
17
09-Dec-18
27-Dec-18
3
A3320
LIGHTING FIXTURE AND DB INSTALLATION
18-Aug-18
25-Aug-18
7
0%
6
25-Dec-18
31-Dec-18
3
A3330
ELECTRICAL TIE-INS
26-Aug-18
02-Sep-18
7
0%
5
05-Jan-19
09-Jan-19
3
A3340
ENERGIZATION
03-Sep-18
08-Sep-18
5
0%
3
09-Jan-19
12-Jan-19
3
A3310-1
HOOK UP
0
0%
5
31-Dec-18
05-Jan-19
3
A6000
EARTH PIT DRILLING
0
0%
4
13-Nov-18
17-Nov-18
5
22-Nov-18 22-Nov-18
07-Jan-19 12-Dec-18
3 3
Electrical A3280
Instrument & Control Co A3950 CABLE TRAY AND SUPPORTS INSTALLATION
28-Jul-18 28-Jul-18
18-Dec-18 12-Aug-18
124 14
0%
40 18
A3960
INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING
13-Aug-18
20-Aug-18
7
0%
4
02-Jan-19
06-Jan-19
3
A3990
DCS MODIFICATION IN CONTROL ROOM BY VENDOR
14-Aug-18
20-Aug-18
6
0%
9
29-Dec-18
07-Jan-19
3
A3970
INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, PRV & CONTROL VALVE)
21-Aug-18
28-Aug-18
7
0%
7
26-Dec-18
02-Jan-19
3
A3980
INSTRUMENT CABLE LAYING
29-Aug-18
03-Sep-18
5
0%
18
11-Dec-18
31-Dec-18
3
A4870
JB INSTALLATION
27-Sep-18
30-Sep-18
3
0%
3
11-Dec-18
13-Dec-18
3
A4790
JB SUPPORT INSTALLATION
16-Dec-18
18-Dec-18
3
0%
3
09-Dec-18
11-Dec-18
3
A3970-1
FIELD INSTRUMENT INSTALLATION (GAUGES / TRANSMITTERS)
0
0%
6
24-Dec-18
30-Dec-18
3
A3970-2
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
3
29-Dec-18
31-Dec-18
4
A3970-11
CABLE GLAND AND TERMINATION (ALONG JBs)
0
0%
4
25-Dec-18
29-Dec-18
3
A3970-21
CABLE GLAND AND TERMINTATION (ALONG INSTRUMENTS)
0
0%
5
27-Dec-18
01-Jan-19
3
F&G CABLE GLANDING AND TERMINATION
0 0
0%
10 5
27-Dec-18 27-Dec-18
07-Jan-19 01-Jan-19
3 3
A6070
F&G LOOP PREPARATION
0
0%
2
01-Jan-19
02-Jan-19
3
A6080
F&G LOOP TESTING
0
0%
4
03-Jan-19
07-Jan-19
3
55 3
0%
75 4
09-Sep-18 A 02-Jan-19
20-Jan-19 06-Jan-19
0 3
F&G System A6060
Pre-commisionin Pre-commisioning A2951 INST LOOP AND FUNCTIONAL TEST
14-Aug-18 14-Aug-18
16-Oct-18 16-Aug-18
A4560
PREPARATION OF PLANS AND PROCEDURES FOR PRECOMMISSIONING
23-Sep-18
30-Sep-18
7
17%
58
09-Sep-18 A
31-Dec-18
4
A4600
ELECTRICAL LIGHTING TEST
23-Sep-18
16-Oct-18
21
0%
5
06-Jan-19
10-Jan-19
0
A4570
LEAK TEST FOR PIPING AND SEPARATOR
30-Sep-18
02-Oct-18
3
0%
4
12-Jan-19
15-Jan-19
0
A4580
PUNCHLIST
03-Oct-18
06-Oct-18
3
0%
4
16-Jan-19
20-Jan-19
0
A4570-1
DELUGE SKID FUNCTIONAL TESTING
0
0%
3
09-Jan-19
12-Jan-19
0
START OF PRODUCTION
17-Oct-18 17-Oct-18
30-Oct-18 20-Oct-18
11 3
0%
9 1
20-Jan-19 20-Jan-19
29-Jan-19 20-Jan-19
0 0
A4960
COMMISSIONING AND STARTUP
22-Oct-18
24-Oct-18
3
0%
5
20-Jan-19
24-Jan-19
0
A4970
PERFORMANCE TESTS
24-Oct-18
30-Oct-18
7
0%
5
24-Jan-19
29-Jan-19
0
30-Dec-17
08-Oct-18
242
81
06-Sep-18 A
27-Jan-19
0
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F0010 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS
30-Dec-17 30-Dec-17 30-Dec-17 30-Dec-17
11-Jan-18 11-Jan-18 11-Jan-18 11-Jan-18
12 12 12 12
23 23 23 23
06-Sep-18 A 06-Sep-18 A 06-Sep-18 A 06-Sep-18 A
20-Nov-18 20-Nov-18 20-Nov-18 20-Nov-18
0 0 0 0
INSTALLATION Structural Steel
31-Jan-18 19-Aug-18
25-Sep-18 21-Aug-18
204 3
48 9
17-Nov-18 20-Nov-18
10-Jan-19 29-Nov-18
3 0
Commissioning A4950
KAHM
98%
F M 1 2
A 3
M 4
29-Nov-18 2017 J Jul A 5 6 7
S 8
17:49
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 49 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Critical Activities TF>5
Page 4 of11
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
19-Aug-18 19-Aug-18
21-Aug-18 21-Aug-18
3 3
0%
9 9
20-Nov-18 20-Nov-18
29-Nov-18 29-Nov-18
0 0
U/G CABLE LAYING
31-Jan-18 31-Jan-18
25-Sep-18 08-Feb-18
204 7
0%
47 14
17-Nov-18 28-Nov-18
09-Jan-19 13-Dec-18
2 2
A3380
CABLE TRAY INSTALLATION
11-Aug-18
26-Aug-18
14
0%
9
25-Nov-18
04-Dec-18
0
A3390
ELECTRICAL EQUIPMENTS INSTALLATION
27-Aug-18
03-Sep-18
7
0%
12
15-Dec-18
27-Dec-18
2
A3400
CABLE LAYING
04-Sep-18
11-Sep-18
7
0%
15
10-Dec-18
26-Dec-18
2
A3410
LIGHTING FIXTURES AND DB INSTALLATION
04-Sep-18
11-Sep-18
7
0%
6
22-Dec-18
27-Dec-18
2
A3420
ELECTRICAL TIE-INS
12-Sep-18
19-Sep-18
7
0%
4
02-Jan-19
06-Jan-19
2
A3430
ENERGIZATION
20-Sep-18
25-Sep-18
5
0%
3
07-Jan-19
09-Jan-19
2
A3400-1
HOOK UP
0
0%
4
29-Dec-18
01-Jan-19
2
A3440
EARTH PIT DRILLING
0
TEST SEPERATOR SEPERAT A2460 INSTALLATION OF LADDERS, STAIRS, HANDRAILS Electrical A3370
Instrument & Control Co A4040 MODIFICATION OF EXISTING DCS SYSTEMS BY VENDOR
0%
4
17-Nov-18
20-Nov-18
5
02-Aug-18 02-Aug-18
20-Sep-18 15-Aug-18
43 12
0%
40 9
26-Nov-18 23-Dec-18
10-Jan-19 01-Jan-19
0 4
A4000
CABLE TRAY AND SUPPORT INSTALLATION
14-Aug-18
29-Aug-18
14
0%
16
26-Nov-18
13-Dec-18
0
A4010
INSTRUMENT EQUIPMENT CALIBRATION / LOOP TESTING
30-Aug-18
06-Sep-18
7
0%
4
07-Jan-19
10-Jan-19
0
A4020
INSTRUMENT EQUIPEMNT INSTALLATION (RO, SDV, PRV AND CONTROL VALVE
08-Sep-18
15-Sep-18
7
0%
7
25-Dec-18
01-Jan-19
0
A4030
INSTRUMENT CABLE LAYING
16-Sep-18
20-Sep-18
5
0%
18
05-Dec-18
25-Dec-18
0
A4030-1
SS TUBE INSTALLATION AND LEAK TEST
0
0%
4
02-Jan-19
06-Jan-19
0
A4020-3
INSTALLATION OF INSTRUMENT VALVE
0
0%
4
01-Jan-19
05-Jan-19
1
A4020-1
FIELD INSTRUMENT INSTALLATION (GAUGES & TRANSMITTERS)
0
0%
7
25-Dec-18
01-Jan-19
0
A4020-2
INSTALLATION OF BS & W ANALYZERS ON METERING SKID
0
0%
3
30-Dec-18
01-Jan-19
4
A4020-11
CABLE GLAND TERMINATION (ALONG INSRUMENT)
0
0%
6
30-Dec-18
05-Jan-19
3
A4020-21
CABLE GLAND TERMINATION (ALONG JBs)
0
0%
7
30-Dec-18
06-Jan-19
0
F&G CABLE GLANDING AND TERMINATION
0 0
0%
10 5
31-Dec-18 31-Dec-18
10-Jan-19 05-Jan-19
3 3
A6160
F&G LOOP PREPARATION
0
0%
2
05-Jan-19
06-Jan-19
3
A6170
F&G LOOP TESTING
0
F&G System A6150
Pre-commisionin Pre-commisioning A3001 INST LOOP AND FUNCITONAL TEST
06-Sep-18 06-Sep-18
27-Sep-18 09-Sep-18
0%
4
07-Jan-19
10-Jan-19
3
19 3
0%
11 4
07-Jan-19 07-Jan-19
19-Jan-19 10-Jan-19
0 0
A4520
DELUGE SKID FUNCTIONAL TEST
12-Sep-18
15-Sep-18
3
0%
3
12-Jan-19
14-Jan-19
0
A4550
ELECTRICAL LIGHITING TEST
12-Sep-18
27-Sep-18
14
0%
5
09-Jan-19
14-Jan-19
0
A4530
PUNCHLIST
16-Sep-18
18-Sep-18
3
0%
4
15-Jan-19
19-Jan-19
0
A4520-1
LEAK TEST FOR SEPARATOR AND PIPING
0
0%
5
10-Jan-19
15-Jan-19
0
19-Jan-19 19-Jan-19
27-Jan-19 20-Jan-19
0 0
START OF PRODUCTION
29-Sep-18 29-Sep-18
08-Oct-18 01-Oct-18
8 3
0%
8 2
A4900
COMMISSIONING AND STARTUP
30-Sep-18
02-Oct-18
3
0%
4
19-Jan-19
22-Jan-19
0
A4910
PERFORMANCE TESTS
02-Oct-18
08-Oct-18
7
0%
5
22-Jan-19
27-Jan-19
0
Commissioning A4890
26-Feb-18
16-Nov-18
282
175
09-Jul-18 A
06-Apr-19
0
FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F330 FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS
24-Mar-18 24-Mar-18 24-Mar-18 24-Mar-18
14-May-18 12-Apr-18 05-Apr-18 05-Apr-18
45 18 12 12
40%
64 48 48 48
11-Sep-18 A 11-Sep-18 A 11-Sep-18 A 11-Sep-18 A
09-Jan-19 22-Dec-18 22-Dec-18 22-Dec-18
0 0 0 0
METERING SKID SK F340 FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO
07-Apr-18 07-Apr-18
09-Apr-18 09-Apr-18
3 3
80%
48 48
11-Sep-18 A 11-Sep-18 A
22-Dec-18 22-Dec-18
0 0
PSV F350
10-Apr-18 10-Apr-18
12-Apr-18 12-Apr-18
3 3
20%
48 48
12-Sep-18 A 12-Sep-18 A
22-Dec-18 22-Dec-18
0 0
31-Mar-18 31-Mar-18 31-Mar-18
14-May-18 14-May-18 30-Apr-18
39 39 27
0%
45 38 29
11-Oct-18 A 11-Oct-18 A 11-Oct-18 A
09-Jan-19 01-Jan-19 22-Dec-18
0 0 0
28-Apr-18
14-May-18
15
JALM
FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFER T
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F400 PIPING FABRICATION & FBE COATING AT KUWAIT F430
FBE PIPING BULK DELIVER AT SITE
REMAINING PIPING PI (NON FBE0 F400-1 COMPLETE PIPING FABRICATION HYDROTEST/ PAINTING & COATING F430-1 INSTALLATION Civil Works COMMOMN A1845-6
FABRICATION SPOOLS DELIVER TO SITE 26-Feb-18
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPLICAB
03-Nov-18
0%
9
23-Dec-18
01-Jan-19
0
0 0
0%
37 33
28-Nov-18 28-Nov-18
09-Jan-19 05-Jan-19
0 0
0
0%
13
26-Dec-18
09-Jan-19
0
70%
151 53 24 24
09-Jul-18 A 09-Jul-18 A 23-Aug-18 A 23-Aug-18 A
15-Mar-19 25-Dec-18 21-Nov-18 21-Nov-18
0 0 5 5
269 0 0 0
F M 1 2
A 3
M 4
29-Nov-18 2017 J Jul A 5 6 7
S 8
17:49
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 50 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Critical Activities TF>5 BL1 Start
BL1 Finish
PIPE SUPPORT A1845-3 EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS
Page 5 of11
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
0 0
98%
53 25
09-Jul-18 A 03-Aug-18 A
25-Dec-18 22-Nov-18
0 0
A1870-1
FOUNDATION WORK (STEEL FIXING)
0
92%
37
09-Jul-18 A
06-Dec-18
0
A1870-2
FOUNDATION WORK (CONCRETE)
0
75%
45
10-Sep-18 A
16-Dec-18
0
A1870-3
CURING / WATERPROOFING / BACK FILLING
0
60%
53
20-Sep-18 A
25-Dec-18
0
07-Oct-18 A 07-Oct-18 A 07-Oct-18 A
14-Jan-19 09-Jan-19 09-Jan-19
2 2 2
06-Sep-18 06-Sep-18 06-Sep-18
25-Sep-18 25-Sep-18 13-Sep-18
17 17 7
0%
68 64 64
23-Sep-18
25-Sep-18
3
0%
8
01-Jan-19
09-Jan-19
2
METERING SKID SK A2550 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK WAY O
10-Sep-18 10-Sep-18
15-Sep-18 15-Sep-18
5 5
0%
12 12
01-Jan-19 01-Jan-19
14-Jan-19 14-Jan-19
2 2
PSV A2560
13-Sep-18 13-Sep-18
18-Sep-18 18-Sep-18
5 5
0%
12 12
01-Jan-19 01-Jan-19
14-Jan-19 14-Jan-19
0 0
19-Sep-18 19-Sep-18
22-Sep-18 22-Sep-18
3 3
0%
16 16
27-Dec-18 27-Dec-18
14-Jan-19 14-Jan-19
0 0
27-Aug-18 27-Aug-18 27-Aug-18
08-Oct-18 18-Sep-18 18-Sep-18
46 20 20
0%
79 32 32
01-Jan-19 01-Jan-19 01-Jan-19
15-Mar-19 06-Feb-19 06-Feb-19
0 4 0
0
Structural Steel TEST SEPERATOR SEPERAT A2540 INSTALLATION OF STRUCTURAL STEELWORK OPERATING AND ACCESS PLATF A2580
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
INSTALLATION OF PSV VALVES ACCESS PLATFORMS
PIPE SUPPORT A2570 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS OF Piping PIPING -REMAINING -REMA A3070 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT A3070-1
0%
9
27-Jan-19
05-Feb-19
5
MOBILIZATION OF HOT TAPPING SUB CONTRACTOR
18-Sep-18 18-Sep-18
08-Oct-18 20-Sep-18
18 3
0%
17 3
10-Feb-19 10-Feb-19
28-Feb-19 12-Feb-19
1 1
HT1090
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
22-Sep-18
02-Oct-18
10
0%
7
12-Feb-19
19-Feb-19
1
HT1100
FLARE TAPPING / NDT
03-Oct-18
06-Oct-18
3
0%
9
19-Feb-19
28-Feb-19
1
HT1110
FLARE TAPPING COMPLETE / REMOVE SCAFFOLD
07-Oct-18
08-Oct-18
2
0%
5
24-Feb-19
28-Feb-19
1
0 0
0%
24 2
21-Feb-19 04-Mar-19
15-Mar-19 05-Mar-19
0 0
6
05-Mar-19
11-Mar-19
0
HOT TAPPING HT1080
INSTALLATION OF BALL VALVE & GGC VALVE
Pre Shutdown and Plant Shutdown Tie-in A3100-2 MOBILIZATION OF OF TEAM APPLY PTW A3100-3
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
0
0%
A3100-4
PIPING TIE-IN / NDT PRE SHUT DOWN
0
0%
7
21-Feb-19
28-Feb-19
0
A3100-5
PIPING TIE-IN / NDT SHUT DOWN
0
0%
11
05-Mar-19
15-Mar-19
0
212 14
0%
84 10
25-Nov-18 05-Feb-19
02-Mar-19 16-Feb-19
2 5
CABLE GLAND AND TERMINATION
26-Feb-18 26-Feb-18
30-Oct-18 13-Mar-18
A3550
U/G CABLE LAYING
14-Mar-18
21-Mar-18
7
0%
13
12-Jan-19
26-Jan-19
4
A3560
CABLE TRAY INSTALLATION
15-Sep-18
30-Sep-18
14
0%
8
10-Jan-19
19-Jan-19
2
A3570
ELECTRICAL EQUIPMENTS INSTALLATION
01-Oct-18
08-Oct-18
7
0%
12
03-Feb-19
16-Feb-19
2
A3580
CABLE LAYING
09-Oct-18
16-Oct-18
7
0%
20
15-Jan-19
06-Feb-19
2
A3590
LIGHTING FIXTURES AND DB INSTALLATION
09-Oct-18
16-Oct-18
7
0%
6
10-Feb-19
16-Feb-19
2
A3600
ELECTRICAL TIE-INS
17-Oct-18
24-Oct-18
7
0%
6
20-Feb-19
26-Feb-19
2
A3610
ENERGIZATION
25-Oct-18
30-Oct-18
5
0%
4
26-Feb-19
02-Mar-19
2
A3580-1
HOOK UP
0
0%
4
17-Feb-19
20-Feb-19
2
A3550-1
BACK FILLING OF CABLE TRENCH
0
0%
13
26-Jan-19
09-Feb-19
4
A6180
CABLE TRENCHES
0
0%
25
25-Nov-18
23-Dec-18
5
A6190
EARTH PIT DRILLING
0
Electrical A3540
Instrument & Control Co A4140 DCS MODIFICATION IN CONTROL ROOM BY VENDOR
06-Sep-18 06-Sep-18
0%
6
04-Dec-18
10-Dec-18
5
03-Nov-18 12-Sep-18
50 6
0%
55 5
29-Dec-18 20-Feb-19
02-Mar-19 25-Feb-19
0 4
A4100
CABLE TRAY AND SUPPORTS INSTALLATION
18-Sep-18
03-Oct-18
14
0%
17
29-Dec-18
16-Jan-19
3
A4540
JB SUPPORT INSTALLATION
19-Sep-18
22-Sep-18
3
0%
3
16-Jan-19
19-Jan-19
3
A4880
JB INSTALLATION
28-Sep-18
01-Oct-18
3
0%
3
20-Jan-19
22-Jan-19
3
A4110
INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST
04-Oct-18
11-Oct-18
7
0%
5
25-Feb-19
02-Mar-19
0
A4120
INSTRUMENT EQUIPEMNT INSTALLATION
13-Oct-18
20-Oct-18
7
0%
20
24-Jan-19
16-Feb-19
4
A4130
INSTRUMENT CABLE LAYING
21-Oct-18
25-Oct-18
5
0%
18
12-Jan-19
31-Jan-19
4
A5310
INSTALLATION OF DELUGE
27-Oct-18
03-Nov-18
7
0%
8
12-Feb-19
20-Feb-19
3
A4130-1
SS TUBE AND LEAK TEST
0
0%
4
21-Feb-19
25-Feb-19
3
A4120-2
INSTALLATION OF INSTRUMENT VALVE
0
0%
5
19-Feb-19
24-Feb-19
0
A4120-1
FIELD INSTRUMENT INSTALLATION (GAUGES / TRANSMITTERS)
0
0%
18
30-Jan-19
19-Feb-19
4
A4120-11
CABLE GLANDING AND TERMINATION (ALONG JBs)
0
0%
6
31-Jan-19
06-Feb-19
3
A4120-21
CABLE GLANDING AND TERMINATION (ALONG INTSTRUMENTS)
0
0%
6
19-Feb-19
25-Feb-19
4
17
06-Feb-19
25-Feb-19
5
Painting & Fireproofing Firep
15-Sep-18
30-Sep-18
14
F M 1 2
A 3
M 4
29-Nov-18 2017 J Jul A 5 6 7
S 8
17:49
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 51 of 170
Rev-D by TA EPIC for Replacement of Old 3-Phase Test Separators at All Degassing Stations in Dukhan Activity ID
Activity Name
U3963- Critical Activities TF>5
Page 6 of11
BL1 Start
BL1 Finish
BL1 Duration
Phy. % Com.
OD
Act.Start / F-C Start
Act. Fin / F-C Fin
TF
A4390
STRUCTURAL STEEL PAINTING AND TOUCH-UP
15-Sep-18
22-Sep-18
7
0%
13
06-Feb-19
20-Feb-19
5
A4400
PIPING PAINTING AND TOUCH-UP
17-Sep-18
24-Sep-18
7
0%
13
06-Feb-19
20-Feb-19
5
A4410
FIREPROOFING FOR STRUCTURAL STEEL
23-Sep-18
30-Sep-18
7
0%
17
06-Feb-19
25-Feb-19
5
17-Sep-18 17-Sep-18
10-Nov-18 19-Sep-18
47 3
0%
11 3
13-Mar-19 13-Mar-19
25-Mar-19 16-Mar-19
0 0
29-Sep-18
01-Nov-18
30
0%
5
19-Mar-19
24-Mar-19
0
Pre-commisionin Pre-commisioning A3101 INST LOOP AND FUNCTIONAL TESTING A4700
ELECTRICAL LIGHITNG TEST
A4670
DELUGE SKID FUNCTIONAL TESTING
02-Oct-18
04-Oct-18
3
0%
5
19-Mar-19
24-Mar-19
0
A4680
LEAK TEST FOR SEPARATOR AND PIPING
04-Nov-18
06-Nov-18
3
0%
3
21-Mar-19
24-Mar-19
0
A4690
PUNCHLIST
07-Nov-18
10-Nov-18
3
0%
4
21-Mar-19
25-Mar-19
0
16-Nov-18
8 3
0%
11 0
25-Mar-19 25-Mar-19
06-Apr-19
START OF PRODUCTION
07-Nov-18 07-Nov-18
0 0
A5080
COMMISSIONING AND STARTUP
08-Nov-18
10-Nov-18
3
0%
4
26-Mar-19
30-Mar-19
0
A5090
PERFORMANCE TESTS
10-Nov-18
16-Nov-18
7
0%
6
31-Mar-19
06-Apr-19
0
18-Apr-18
26-Nov-18
191
178
05-Sep-18 A
20-May-19
0
18-Apr-18 18-Apr-18 18-Apr-18 18-Apr-18
14-Jun-18 17-May-18 03-May-18 03-May-18
50 26 14 14
50%
56 56 56 56
09-Sep-18 A 09-Sep-18 A 11-Sep-18 A 11-Sep-18 A
29-Dec-18 29-Dec-18 29-Dec-18 29-Dec-18
4 4 4 4
METERING SKID SK F450 COMPLETE SS FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS
05-May-18 05-May-18
08-May-18 08-May-18
4 4
80%
56 56
09-Sep-18 A 09-Sep-18 A
29-Dec-18 29-Dec-18
4 4
PIPE SUPPORT F470 COMPLETE FAB. OF PIPESUPPORT STRUCTURE BY PETROSERV & TRANSFE
14-May-18 14-May-18
17-May-18 17-May-18
4 4
40%
48 48
12-Sep-18 A 12-Sep-18 A
19-Dec-18 19-Dec-18
4 4
01-May-18 01-May-18 01-May-18
14-Jun-18 14-Jun-18 27-May-18
39 39 23
0%
47 47 39
11-Oct-18 A 11-Oct-18 A 11-Oct-18 A
25-Dec-18 25-Dec-18 16-Dec-18
3 3 3
FBE PIPING BULK DELIVER AT SITE
29-May-18
14-Jun-18
15
0%
8
17-Dec-18
25-Dec-18
3
CABLE TRENCHES AND UTILITY ROAD CROSSINGS
09-May-18 27-Jun-18 27-Jun-18 27-Jun-18
18-Nov-18 18-Nov-18 18-Nov-18 21-Jul-18
166 124 124 21
35%
175 175 175 40
05-Sep-18 A 05-Sep-18 A 05-Sep-18 A 10-Sep-18 A
16-May-19 16-May-19 16-May-19 10-Dec-18
0 0 0 0
A2020
ROADS AND PAVING(INCLUDING MODIFICATIONS)
25-Oct-18
10-Nov-18
14
0%
14
04-Apr-19
20-Apr-19
0
A2040
DRAINAGE PIPE CULVERTS
25-Oct-18
10-Nov-18
14
0%
36
11-Dec-18
21-Jan-19
0
A2050
ROAD SAFETY CRASH BARRIERS AND BOLLARD
25-Oct-18
18-Nov-18
21
0%
13
18-Apr-19
02-May-19
0
A2080
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
07-Nov-18
10-Nov-18
3
0%
13
02-May-19
16-May-19
0
A1960-1
PROTECTION OF UNDERGROUND CABLES
0
90%
4
10-Sep-18 A
10-Dec-18
0
A1965-5
SOAKWAY PIT EXCAVATION & INSTALLATION INCL. DEMOLITION - IF APPLICAB
0
55%
40
05-Sep-18 A
10-Dec-18
0
20-Dec-18 31-Dec-18 31-Dec-18
02-Feb-19 20-Jan-19 20-Jan-19
4 4 4
Commissioning A5070
FAHS FABRICATION Structural Steel Fabrication TEST SEPERATOR SEPERAT F440 COMPLETE FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/H
Piping Fabrication Fabricati FBE PIPING (AT KUWAIT) F510 PIPING FABRICATION & FBE COATING AT KUWAIT F540 INSTALLATION Civil Works COMMOMN A2030
Structural Steel METERING SKID SK A2610 INSTALLATION OF STRUCTURAL STEEL OF METERING SKID INCL. WALK WAY O
27-Sep-18 27-Sep-18 27-Sep-18
09-Oct-18 02-Oct-18 02-Oct-18
11 5 5
0%
38 18 18
PIPE SUPPORT A2630 INSTALLATION OF STRUCTURAL STEEL PIPE SUPPORTS & MODIFICATIONS OF
07-Oct-18 07-Oct-18
09-Oct-18 09-Oct-18
3 3
0%
28 28
20-Dec-18 20-Dec-18
21-Jan-19 21-Jan-19
4 4
0 0
0%
5 5
28-Jan-19 28-Jan-19
02-Feb-19 02-Feb-19
4 4
23-Dec-18 23-Dec-18 23-Dec-18
22-Apr-19 12-Feb-19 03-Feb-19
4 4 3
FIELD INSTRUMENT INSTRUM A2630-1 INSTALLATION OF INSTRUMENT STANCHION
0%
104 45 37
A3130
INLET PIPING TIE-IN TO SEPARATOR (PARTIAL SHUTDOWN TIE-IN)
24-Sep-18
30-Sep-18
6
0%
5
29-Jan-19
03-Feb-19
4
A3140
HYDRO-TESTING, FLUSHING, DRAINING AND PURGING
01-Oct-18
03-Oct-18
3
0%
13
29-Jan-19
12-Feb-19
4
A3150
TIE-IN
04-Oct-18
11-Oct-18
7
0%
5
29-Jan-19
03-Feb-19
4
A3120-1
INSTALLATION OF BALL VALVE & GGC VALVE
0
0%
9
15-Jan-19
24-Jan-19
4
28-Feb-19 28-Feb-19
22-Apr-19 03-Mar-19
4 4
Piping PIPING -REMAINING -REMA A3120 PIPING INSTALLATION ON PIPE SUPPORT,PIERACK & AROUND EQUIPMENT
15-Sep-18 15-Sep-18 15-Sep-18
25-Oct-18 11-Oct-18 01-Oct-18
36 24 15
MOBILIZATION OF HOT TAPPING SUB CONTRACTOR
06-Oct-18 06-Oct-18
25-Oct-18 08-Oct-18
18 3
0%
46 3
HT1130
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
09-Oct-18
20-Oct-18
10
0%
9
03-Mar-19
12-Mar-19
4
HT1140
FLARE TIE-IN / NDT
21-Oct-18
23-Oct-18
3
0%
13
13-Mar-19
27-Mar-19
4
HT1150
HOT TIE-IN COMPLETE / REMOVE SCAFFOLD
24-Oct-18
25-Oct-18
2
0%
12
09-Apr-19
22-Apr-19
4
0 0
0%
21 1
30-Mar-19 30-Mar-19
22-Apr-19 30-Mar-19
4 4
0
0%
8
31-Mar-19
08-Apr-19
4
HOT TAPPING HT1120
Pre Shutdown and Plant Shutdown Tie-in A3150-000 MOBILIZATION OF OF TEAM APPLY PTW A3150-00
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE
F M 1 2
A 3
M 4
29-Nov-18 2017 J Jul A 5 6 7
S 8
17:49
2018 2019 O N D J F M A M J Jul A S O N D J F M A M J Jul A S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 52 of 170
PROJECT PLANNING PACKAGE
Attachment 3
JALEHA SHUTDOWN SCHEDULE
Page 53 of 170
TIE-IN SCHEDULE - (JALM) Activity ID
TIE-IN SCHEDULE - (JALM)
Activity Name
OD
Act. Fin / F-C Fin
Act.Start / F-C Start
537.00
20-Mar-19 08:00
14-Feb-19 17:00
537.00
20-Mar-19 08:00
14-Feb-19 17:00
250.00
02-Mar-19 09:00
14-Feb-19 17:00
20-Feb-19 17:00 14-Feb-19 17:00*
14-Feb-19 17:00
CO-ORDINATE LEVEL CHECK FOR PIPING SUPPORT & SPOOLS
96.00 0.00
THICKNESS / LAMINATION CHECK FOR TIE-IN POINTS
40.00
20-Feb-19 17:00
17-Feb-19 07:00
JM01-6"-P12134 JM01-6"-P12134-CS1-900-4 PSD (01 JOINT) SD-JL-34030 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP
50.00 2.00
23-Feb-19 21:00 20-Feb-19 19:00
20-Feb-19 17:00 20-Feb-19 17:00
TIE-IN SCHEDULE SCHED - (JALM) JALM - 19 TIE-IN PRE-SHUTDOWN TIE-IN - 07 TIE-IN COMMON SD-JL-10021 SD-JL-10001
SD-JL-34040
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
6.00
21-Feb-19 01:00
20-Feb-19 19:00
SD-JL-33960
FLUSHING & PURGING
6.00
21-Feb-19 07:00
21-Feb-19 01:00
SD-JL-33970
PIPE CUTTING AND INSPECTION BY QC
8.00
21-Feb-19 15:00
21-Feb-19 07:00
SD-JL-33980
FITUP, WELDING PIPING SPOOL & PWHT
20.00
22-Feb-19 11:00
21-Feb-19 15:00
SD-JL-33990
NDT - APPROVED
4.00
22-Feb-19 15:00
22-Feb-19 11:00
SD-JL-34050
VALVE INSTALLATION
10.00
23-Feb-19 05:00
22-Feb-19 15:00
SD-JL-34060
DE-BLINDING
6.00
23-Feb-19 15:00
23-Feb-19 05:00
SD-JL-34020
FINAL TOUCH UP AND QC INSPECTION
6.00
23-Feb-19 21:00
23-Feb-19 15:00
SD-JL-34110
HANDOVER TO OPERATION
0.00
23-Feb-19 21:00
57.00 2.00
25-Feb-19 03:00 21-Feb-19 15:00
21-Feb-19 13:00 21-Feb-19 13:00
JM02-31-0875-3" JM02-31-0875-3"-OD-CS1-300-4 PSD (02 JOINTS) SD-JL-34140 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34150
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
6.00
21-Feb-19 21:00
21-Feb-19 15:00
SD-JL-34070
FLUSHING & PURGING
6.00
22-Feb-19 03:00
21-Feb-19 21:00
SD-JL-34080
PIPE CUTTING AND INSPECTION BY QC
8.00
22-Feb-19 11:00
22-Feb-19 03:00
SD-JL-34090
FITUP, WELDING PIPING SPOOL & PWHT
20.00
23-Feb-19 07:00
22-Feb-19 11:00
SD-JL-34100
NDT - APPROVED
14.00
23-Feb-19 21:00
23-Feb-19 07:00
SD-JL-35960
VALVE INSTALLATION
10.00
24-Feb-19 11:00
23-Feb-19 21:00
SD-JL-35970
DE-BLINDING
6.00
24-Feb-19 21:00
24-Feb-19 11:00
SD-JL-35980
FINAL TOUCH UP AND QC INSPECTION
6.00
25-Feb-19 03:00
24-Feb-19 21:00
SD-JL-35990
HANDOVER TO OPERATION
0.00
25-Feb-19 03:00
58.00 2.00
25-Feb-19 23:00 22-Feb-19 11:00
22-Feb-19 09:00 22-Feb-19 09:00
JM02A-31-0330-3 JM02A-31-0330-3"-OD-L3-300-1 PSD (01 JOINT) SD-JL-34340 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34350
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
6.00
22-Feb-19 17:00
22-Feb-19 11:00
SD-JL-34270
FLUSHING & PURGING
6.00
22-Feb-19 23:00
22-Feb-19 17:00
SD-JL-34280
PIPE CUTTING AND INSPECTION BY QC
8.00
23-Feb-19 07:00
22-Feb-19 23:00
SD-JL-34290
FITUP, WELDING PIPING SPOOL & PWHT
20.00
24-Feb-19 03:00
23-Feb-19 07:00
SD-JL-34300
NDT - APPROVED
14.00
24-Feb-19 17:00
24-Feb-19 03:00
SD-JL-36000
VALVE INSTALLATION
10.00
25-Feb-19 09:00
24-Feb-19 17:00
SD-JL-36010
DE-BLINDING
6.00
25-Feb-19 17:00
25-Feb-19 09:00
SD-JL-36020
FINAL TOUCH UP AND QC INSPECTION
6.00
25-Feb-19 23:00
25-Feb-19 17:00
SD-JL-36030
HANDOVER TO OPERATION
0.00
25-Feb-19 23:00
49.00 2.00
26-Feb-19 10:00 23-Feb-19 11:00
23-Feb-19 09:00 23-Feb-19 09:00
5.00
23-Feb-19 16:00
23-Feb-19 11:00
JM16A-2"-A1101 JM16A-2"-A11016-CS1-150-4 PSD (THD JOINT) SD-JL-35640 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35650
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
SD-JL-35580
PIPE, CUTTING AND INSPECTION BY QC
6.00
24-Feb-19 03:00
23-Feb-19 21:00
SD-JL-35590
THREADED JOINT AND SEAL
22.00
25-Feb-19 01:00
24-Feb-19 03:00
SD-JL-35600
QC INSPECTION
3.00
25-Feb-19 04:00
25-Feb-19 01:00
SD-JL-36040
VALVE INSTALLATION
10.00
25-Feb-19 18:00
25-Feb-19 04:00
SD-JL-36060
FINAL TOUCH UP AND QC INSPECTION
6.00
26-Feb-19 10:00
26-Feb-19 04:00
SD-JL-36070
HANDOVER TO OPERATION
0.00
26-Feb-19 10:00
48.00 2.00
27-Feb-19 08:00 24-Feb-19 09:00
JM16B-2"-A1101 JM16B-2"-A11016-CS1-150-4 PSD (THD JOINT) SD-JL-35740 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP Remaining Work Critical Remaining Work Milestone
P3963-JMT
Feb 1
Mar 2
Apr 3
May 4
Page 1 of5 Jun 5
2017 Jul 6
Aug 7
Sep 8
Oct 9
Nov 10
Dec 11
29-Nov-18 Jan 12
Feb 13
Mar 14
Apr 15
May 16
Jun 17
2018 Jul 18
Aug 19
13:39 Sep 20
Oct 21
Nov 22
Dec 23
Jan 24
2019 Feb Mar 25 26
Apr 27
24-Feb-19 07:00 24-Feb-19 07:00
Page 1 of 5 CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
Date 29-Nov-18
Rev-D Revision Jaleha Shutdown Schedule for QP aprro
Checked
Approved
TIE-IN SCHEDULE - (JALM) TIE-IN SCHEDULE - (JALM)
Page 54 of 170
TIE-IN SCHEDULE - (JALM) Activity ID
Activity Name
TIE-IN SCHEDULE - (JALM) OD
Act. Fin / F-C Fin
Act.Start / F-C Start
SD-JL-35750
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
5.00
24-Feb-19 14:00
24-Feb-19 09:00
SD-JL-35680
PIPE CUTTING AND INSPECTION BY QC
6.00
25-Feb-19 01:00
24-Feb-19 19:00
SD-JL-35690
THREADED JOINT AND SEAL
22.00
25-Feb-19 23:00
25-Feb-19 01:00
SD-JL-35700
QC INSPECTION
3.00
26-Feb-19 02:00
25-Feb-19 23:00
SD-JL-36080
VALVE INSTALLATION
10.00
26-Feb-19 16:00
26-Feb-19 02:00
SD-JL-36100
FINAL TOUCH UP AND QC INSPECTION
6.00
27-Feb-19 08:00
27-Feb-19 02:00
SD-JL-36110
HANDOVER TO OPERATION
0.00
27-Feb-19 08:00
43.00 2.00
28-Feb-19 11:00 25-Feb-19 21:00
25-Feb-19 19:00 25-Feb-19 19:00
6.00
26-Feb-19 03:00
25-Feb-19 21:00
JM17A/B-6"-P121 JM17A/B-6"-P12134-CS1-900-4X PSD (SD VALVE REPLACEMENT) SD-JL-35840 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35850
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
SD-JL-35770
CABLE ISOLATION AND REMOVAL OF CABLE
6.00
26-Feb-19 09:00
26-Feb-19 03:00
SD-JL-35780
EXISTING VALVE REMOVAL
12.00
26-Feb-19 21:00
26-Feb-19 09:00
SD-JL-35790
VALVE INSTALLATION
18.00
27-Feb-19 15:00
26-Feb-19 21:00
SD-JL-35800
QC INSPECTION
6.00
27-Feb-19 21:00
27-Feb-19 15:00
SD-JL-36130
GLANDING AND TERMINATION OF CABLE
6.00
28-Feb-19 05:00
27-Feb-19 21:00
SD-JL-36140
LOOP TESTING
6.00
28-Feb-19 11:00
28-Feb-19 05:00
SD-JL-36150
HANDOVER TO OPERATION
0.00
28-Feb-19 11:00
50.00 2.00
02-Mar-19 09:00 27-Feb-19 07:00
27-Feb-19 05:00 27-Feb-19 05:00
JM18-6"-WF-31-0 JM18-6"-WF-31-0774-CS1-150-4 PSD (02 JOINTS) SD-JL-35940 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35950
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
6.00
27-Feb-19 13:00
27-Feb-19 07:00
SD-JL-35870
FLUSHING & PURGING
6.00
27-Feb-19 19:00
27-Feb-19 13:00
SD-JL-35880
PIPE CUTTING AND INSPECTION BY QC
8.00
28-Feb-19 03:00
27-Feb-19 19:00
SD-JL-35890
FITUP, WELDING PIPING SPOOL & PWHT
18.00
28-Feb-19 21:00
28-Feb-19 03:00
SD-JL-35900
NDT - APPROVED
6.00
01-Mar-19 03:00
28-Feb-19 21:00
SD-JL-36160
VALVE INSTALLATION
10.00
01-Mar-19 17:00
01-Mar-19 03:00
SD-JL-36170
DE-BLINDING
6.00
02-Mar-19 03:00
01-Mar-19 17:00
SD-JL-36180
FINAL TOUCH UP AND QC INSPECTION
6.00
02-Mar-19 09:00
02-Mar-19 03:00
SD-JL-36190
HANDOVER TO OPERATION
0.00
02-Mar-19 09:00
199.00
15-Mar-19 14:00
03-Mar-19 03:00
PLANT SHUTDOWN SHUTDOW SD-JL-10000 PLANT SHUTDOWN AND DE-CONTAMINATION
30.00 30.00
04-Mar-19 23:00 04-Mar-19 23:00
03-Mar-19 03:00 03-Mar-19 03:00
TIE-INS JM03-3"-WD-31-0244-CS1-900-8 (01 JOINT) JM03-3"-WD-31 SD-JL-34440 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP
164.00 43.00 2.00
15-Mar-19 14:00 08-Mar-19 01:00 05-Mar-19 08:00
05-Mar-19 06:00 05-Mar-19 06:00 05-Mar-19 06:00*
SHUTDOWN TIE-IN TIE - 12 TIE-IN
SD-JL-34450
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
8.00
05-Mar-19 16:00
05-Mar-19 08:00
SD-JL-34370
FLUSHING & PURGING
6.00
05-Mar-19 22:00
05-Mar-19 16:00
SD-JL-34380
PIPE CUTTING AND INSPECTION BY QC
10.00
06-Mar-19 08:00
05-Mar-19 22:00
SD-JL-34390
FITUP, WELDING PIPING SPOOL & PWHT
12.00
06-Mar-19 10:00
05-Mar-19 22:00
SD-JL-34400
NDT - APPROVED
6.00
06-Mar-19 16:00
06-Mar-19 10:00
SD-JL-36200
VALVE INSTALLATION
12.00
07-Mar-19 10:00
06-Mar-19 16:00
SD-JL-36210
DE-BLINDING
6.00
07-Mar-19 18:00
07-Mar-19 10:00
SD-JL-36220
FINAL TOUCH UP AND QC INSPECTION
6.00
08-Mar-19 00:00
07-Mar-19 18:00
SD-JL-36230
HANDOVER TO OPERATION
0.00
08-Mar-19 01:00
74.00 2.00
09-Mar-19 22:00 05-Mar-19 10:00
05-Mar-19 08:00 05-Mar-19 08:00
JM06A/B-16"-W JM06A/B-16"-WD-31-0636-L3-300-1 (02 JOINTS) SD-JL-34840 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34850
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
24.00
06-Mar-19 10:00
05-Mar-19 10:00
SD-JL-34770
FLUSHING & PURGING
10.00
06-Mar-19 20:00
06-Mar-19 10:00
SD-JL-34780
PIPE CUTTING AND INSPECTION BY QC
14.00
07-Mar-19 10:00
06-Mar-19 20:00
SD-JL-34790
FITUP, WELDING PIPING SPOOL & PWHT
18.00
08-Mar-19 04:00
07-Mar-19 10:00
SD-JL-34800
NDT - APPROVED
10.00
08-Mar-19 14:00
08-Mar-19 04:00
SD-JL-36280
VALVE INSTALLATION
10.00
09-Mar-19 04:00
08-Mar-19 14:00
SD-JL-36290
DE-BLINDING
8.00
09-Mar-19 16:00
09-Mar-19 04:00
SD-JL-36300
FINAL TOUCH UP AND QC INSPECTION
6.00
09-Mar-19 22:00
09-Mar-19 16:00
SD-JL-36310
HANDOVER TO OPERATION
0.00
09-Mar-19 22:00
66.00 2.00
11-Mar-19 16:00 07-Mar-19 16:00
07-Mar-19 14:00 07-Mar-19 14:00
12.00
08-Mar-19 04:00
07-Mar-19 16:00
JM12A-8"-GV-31 JM12A-8"-GV-31-1409-CS1-150-8 (01 JOINT) SD-JL-34240 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34250
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
Feb 1
Mar 2
Apr 3
May 4
Page 2 of5 Jun 5
2017 Jul 6
Aug 7
Sep 8
Oct 9
Nov 10
Dec 11
29-Nov-18 Jan 12
Feb 13
Mar 14
Apr 15
May 16
Jun 17
2018 Jul 18
Aug 19
13:39 Sep 20
Oct 21
Nov 22
Dec 23
Jan 24
2019 Feb Mar 25 26
Apr 27
Page 55 of 170
TIE-IN SCHEDULE - (JALM) Activity ID
Activity Name
TIE-IN SCHEDULE - (JALM) OD
Act. Fin / F-C Fin
Act.Start / F-C Start
SD-JL-34170
FLUSHING & PURGING
8.00
08-Mar-19 12:00
08-Mar-19 04:00
SD-JL-34180
PIPE CUTTING AND INSPECTION BY QC
16.00
09-Mar-19 04:00
08-Mar-19 12:00
SD-JL-34190
FITUP, WELDING PIPING SPOOL & PWHT
18.00
09-Mar-19 22:00
09-Mar-19 04:00
SD-JL-34200
NDT - APPROVED
8.00
10-Mar-19 06:00
09-Mar-19 22:00
SD-JL-36320
VALVE INSTALLATION
12.00
11-Mar-19 02:00
10-Mar-19 08:00
SD-JL-36330
DE-BLINDING
6.00
11-Mar-19 10:00
11-Mar-19 02:00
SD-JL-36340
FINAL TOUCH UP AND QC INSPECTION
6.00
11-Mar-19 16:00
11-Mar-19 10:00
SD-JL-36350
HANDOVER TO OPERATION
0.00
11-Mar-19 16:00
132.00 2.00
15-Mar-19 14:00 07-Mar-19 08:00
07-Mar-19 06:00 07-Mar-19 06:00
JM12B-30"-GV-3 JM12B-30"-GV-31-1400-CS1-150-8 (02 JOINTS) SD-JL-35440 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35450
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
34.00
08-Mar-19 18:00
07-Mar-19 08:00
SD-JL-35370
FLUSHING & PURGING
16.00
09-Mar-19 10:00
08-Mar-19 18:00
SD-JL-35380
PIPE CUTTING AND INSPECTION BY QC
36.00
10-Mar-19 22:00
09-Mar-19 10:00
SD-JL-35390
FITUP WELDING PIPING SPOOL & PWHT
48.00
12-Mar-19 22:00
10-Mar-19 22:00
SD-JL-35400
NDT - APPROVED
12.00
13-Mar-19 10:00
12-Mar-19 22:00
SD-JL-36360
VALVE INSTALLATION
18.00
14-Mar-19 12:00
13-Mar-19 10:00
SD-JL-36370
DE-BLINDING
12.00
15-Mar-19 06:00
14-Mar-19 14:00
SD-JL-36380
FINAL TOUCH UP AND QC INSPECTION
8.00
15-Mar-19 14:00
15-Mar-19 06:00
SD-JL-36390
HANDOVER TO OPERATION
JM04-3"-OC-31JM04-3"-OC-31-0266-CS1-900-8 (01 JOINT) SD-JL-34540 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP
0.00
15-Mar-19 14:00
47.00 2.00
08-Mar-19 05:00 05-Mar-19 08:00
05-Mar-19 06:00 05-Mar-19 06:00*
SD-JL-34550
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
8.00
05-Mar-19 16:00
05-Mar-19 08:00
SD-JL-34470
FLUSHING & PURGING
6.00
05-Mar-19 22:00
05-Mar-19 16:00
SD-JL-34480
PIPE CUTTING AND INSPECTION BY QC
10.00
06-Mar-19 08:00
05-Mar-19 22:00
SD-JL-34490
FITUP, WELDING PIPING SPOOL & PWHT
12.00
06-Mar-19 20:00
06-Mar-19 08:00
SD-JL-34500
NDT - APPROVED
3.00
06-Mar-19 23:00
06-Mar-19 20:00
SD-JL-36240
VALVE INSTALLATION
10.00
07-Mar-19 15:00
07-Mar-19 01:00
SD-JL-36250
DE-BLINDING
6.00
07-Mar-19 23:00
07-Mar-19 15:00
SD-JL-36260
FINAL TOUCH UP AND QC INSPECTION
6.00
08-Mar-19 05:00
07-Mar-19 23:00
SD-JL-36270
HANDOVER TO OPERATION
0.00
08-Mar-19 05:00
50.00 2.00
09-Mar-19 18:00 06-Mar-19 18:00
06-Mar-19 16:00 06-Mar-19 16:00
10.00
07-Mar-19 04:00
06-Mar-19 18:00
JM05A-4"-P1102 JM05A-4"-P11021-CS1-300-4 (01 JOINT) SD-JL-34640 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34650
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
SD-JL-34570
FLUSHING & PURGING
6.00
07-Mar-19 10:00
07-Mar-19 04:00
SD-JL-34580
PIPE CUTTING AND INSPECTION BY QC
10.00
07-Mar-19 20:00
07-Mar-19 10:00
SD-JL-34590
FITUP, WELDING PIPING SPOOL & PWHT
12.00
08-Mar-19 08:00
07-Mar-19 20:00
SD-JL-34600
NDT - APPROVED
4.00
08-Mar-19 12:00
08-Mar-19 08:00
SD-JL-36560
VALVE INSTALLATION
10.00
09-Mar-19 04:00
08-Mar-19 14:00
SD-JL-36570
DE-BLINDING
6.00
09-Mar-19 12:00
09-Mar-19 04:00
SD-JL-36580
FINAL TOUCH UP AND QC INSPECTION
6.00
09-Mar-19 18:00
09-Mar-19 12:00
SD-JL-36590
HANDOVER TO OPERATION
0.00
09-Mar-19 18:00
66.00 2.00
11-Mar-19 22:00 07-Mar-19 20:00
07-Mar-19 18:00 07-Mar-19 18:00
JM05B-16"-OC-3 JM05B-16"-OC-31-0218-CS1-300-4 (02 JOINTS) SD-JL-34740 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34750
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
14.00
08-Mar-19 10:00
07-Mar-19 20:00
SD-JL-34670
FLUSHING & PURGING
10.00
08-Mar-19 20:00
08-Mar-19 10:00
SD-JL-34680
PIPE CUTTING AND INSPECTION BY QC
12.00
09-Mar-19 08:00
08-Mar-19 20:00
SD-JL-34690
FITUP, WELDING PIPING SPOOL & PWHT
18.00
10-Mar-19 02:00
09-Mar-19 08:00
SD-JL-34700
NDT - APPROVED
8.00
10-Mar-19 10:00
10-Mar-19 02:00
SD-JL-36600
VALVE INSTALLATION
14.00
11-Mar-19 06:00
10-Mar-19 10:00
SD-JL-36610
DE-BLINDING
6.00
11-Mar-19 16:00
11-Mar-19 08:00
SD-JL-36620
FINAL TOUCH UP AND QC INSPECTION
6.00
11-Mar-19 22:00
11-Mar-19 16:00
SD-JL-36630
HANDOVER TO OPERATION
JM13-14"-GP-31 JM13-14"-GP-31-9008-CS1-300-4 (02 JOINTS) SD-JL-35540 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP
0.00
11-Mar-19 22:00
60.00 2.00
13-Mar-19 12:00 09-Mar-19 20:00
09-Mar-19 18:00 09-Mar-19 18:00
SD-JL-35550
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
10.00
10-Mar-19 06:00
09-Mar-19 20:00
SD-JL-35470
FLUSHING & PURGING
8.00
10-Mar-19 14:00
10-Mar-19 06:00
Feb 1
Mar 2
Apr 3
May 4
Page 3 of5 Jun 5
2017 Jul 6
Aug 7
Sep 8
Oct 9
Nov 10
Dec 11
29-Nov-18 Jan 12
Feb 13
Mar 14
Apr 15
May 16
Jun 17
2018 Jul 18
Aug 19
13:39 Sep 20
Oct 21
Nov 22
Dec 23
Jan 24
2019 Feb Mar 25 26
Apr 27
Page 56 of 170
TIE-IN SCHEDULE - (JALM) Activity ID
Activity Name
TIE-IN SCHEDULE - (JALM) OD
Act. Fin / F-C Fin
Act.Start / F-C Start
SD-JL-35480
PIPE CUTTING AND INSPECTION BY QC
12.00
11-Mar-19 02:00
10-Mar-19 14:00
SD-JL-35490
FITUP, WELDING PIPING SPOOL & PWHT
18.00
11-Mar-19 20:00
11-Mar-19 02:00
SD-JL-35500
NDT - APPROVED
8.00
12-Mar-19 04:00
11-Mar-19 20:00
SD-JL-36640
VALVE INSTALLATION
12.00
12-Mar-19 22:00
12-Mar-19 04:00
SD-JL-36650
DE-BLINDING
6.00
13-Mar-19 06:00
12-Mar-19 22:00
SD-JL-36660
FINAL TOUCH UP AND QC INSPECTION
6.00
13-Mar-19 12:00
13-Mar-19 06:00
SD-JL-36670
HANDOVER TO OPERATION
0.00
13-Mar-19 12:00
43.00 2.00
08-Mar-19 01:00 05-Mar-19 08:00
05-Mar-19 06:00 05-Mar-19 06:00
JM07-3"-WD-31 JM07-3"-WD-31-0699-L3-300-1 (FLANGED CONNECTION) SD-JL-34940 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-34950
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
6.00
05-Mar-19 14:00
05-Mar-19 08:00
SD-JL-34870
FLUSHING & PURGING
6.00
05-Mar-19 20:00
05-Mar-19 14:00
SD-JL-34880
UNBOLTING, REMOVAL OF EXISTING JOINT AND INSPECTION BY QC
8.00
06-Mar-19 04:00
05-Mar-19 20:00
SD-JL-34890
INSTALLATION OF NEW BOLT JOINT
12.00
06-Mar-19 16:00
06-Mar-19 04:00
SD-JL-34900
LEAKAGE INSPECTION
3.00
06-Mar-19 19:00
06-Mar-19 16:00
SD-JL-36400
VALVE INSTALLATION
10.00
07-Mar-19 10:00
06-Mar-19 20:00
SD-JL-36410
DE-BLINDING
6.00
07-Mar-19 18:00
07-Mar-19 10:00
SD-JL-36420
FINAL TOUCH UP AND QC INSPECTION
6.00
08-Mar-19 00:00
07-Mar-19 18:00
SD-JL-36430
HANDOVER TO OPERATION
0.00
08-Mar-19 01:00
44.00 2.00
09-Mar-19 12:00 06-Mar-19 20:00
06-Mar-19 18:00 06-Mar-19 18:00
JM09A-4"-GL-31 JM09A-4"-GL-31-9017-CS1-150-8 (01 JOINT) SD-JL-35140 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35150
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
6.00
07-Mar-19 02:00
06-Mar-19 20:00
SD-JL-35070
FLUSHING & PURGING
6.00
07-Mar-19 08:00
07-Mar-19 02:00
SD-JL-35080
PIPE CUTTING AND INSPECTION BY QC
8.00
07-Mar-19 16:00
07-Mar-19 08:00
SD-JL-35090
FITUP, WELDING PIPING SPOOL & PWHT
12.00
08-Mar-19 04:00
07-Mar-19 16:00
SD-JL-35100
NDT - APPROVED
4.00
08-Mar-19 08:00
08-Mar-19 04:00
SD-JL-36440
VALVE INSTALLATION
10.00
08-Mar-19 22:00
08-Mar-19 08:00
SD-JL-36450
DE-BLINDING
6.00
09-Mar-19 06:00
08-Mar-19 22:00
SD-JL-36460
FINAL TOUCH UP AND QC INSPECTION
6.00
09-Mar-19 12:00
09-Mar-19 06:00
SD-JL-36470
HANDOVER TO OPERATION
JM09B-16"-GL-3 JM09B-16"-GL-31-9015-CS1-150-8 (02 JOINTS) SD-JL-35240 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP
0.00
09-Mar-19 12:00
70.00 2.00
11-Mar-19 18:00 07-Mar-19 12:00
07-Mar-19 10:00 07-Mar-19 10:00
SD-JL-35250
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
12.00
08-Mar-19 00:00
07-Mar-19 12:00
SD-JL-35170
FLUSHING & PURGING
10.00
08-Mar-19 10:00
08-Mar-19 00:00
SD-JL-35180
PIEP CUTTING AND INSPECTION BY QC
18.00
09-Mar-19 04:00
08-Mar-19 10:00
SD-JL-35190
FITUP, WELDING PIPING SPOOL & PWHT
18.00
09-Mar-19 22:00
09-Mar-19 04:00
SD-JL-35200
NDT - APPROVED
8.00
10-Mar-19 06:00
09-Mar-19 22:00
SD-JL-36480
VALVE INSTALLATION
12.00
11-Mar-19 02:00
10-Mar-19 08:00
SD-JL-36490
DE-BLINDING
8.00
11-Mar-19 12:00
11-Mar-19 02:00
SD-JL-36500
FINAL TOUCH UP AND QC INSPECTION
6.00
11-Mar-19 18:00
11-Mar-19 12:00
SD-JL-36510
HANDOVER TO OPERATION
0.00
11-Mar-19 18:00
44.00 2.00
12-Mar-19 16:00 10-Mar-19 00:00
09-Mar-19 22:00 09-Mar-19 22:00
6.00
10-Mar-19 06:00
10-Mar-19 00:00
JM10-1"-D11042 JM10-1"-D11042-CS1-300-4 (01 JOINT) SD-JL-35340 PTW SIGNED AND RECEIVED CLEAN PIPE FROM QP SD-JL-35350
APPLY BLINDING / SLIP PLATE / SYSTEM ISOLATION
SD-JL-35270
FLUSHING & PURGING
6.00
10-Mar-19 12:00
10-Mar-19 06:00
SD-JL-35280
PIPE CUTTING AND INSPECTION BY QC
10.00
10-Mar-19 22:00
10-Mar-19 12:00
SD-JL-35290
FITUP, WELDING PIPING SPOOL & PWHT
12.00
11-Mar-19 10:00
10-Mar-19 22:00
SD-JL-35300
NDT - APPROVED
6.00
11-Mar-19 16:00
11-Mar-19 10:00
SD-JL-36520
VALVE INSTALLATION
8.00
12-Mar-19 04:00
11-Mar-19 16:00
SD-JL-36530
DE-BLINDING
6.00
12-Mar-19 12:00
12-Mar-19 04:00
SD-JL-36540
FINAL TOUCH UP AND QC INSPECTION
4.00
12-Mar-19 16:00
12-Mar-19 12:00
SD-JL-36550
HANDOVER TO OPERATION
0.00
12-Mar-19 16:00
0.00
20-Mar-19 08:00
20-Mar-19 08:00
0.00 0.00
20-Mar-19 08:00
20-Mar-19 08:00 20-Mar-19 08:00*
124.00
14-Mar-19 02:00
06-Mar-19 08:00
18.00 2.00
07-Mar-19 10:00 06-Mar-19 10:00
06-Mar-19 08:00 06-Mar-19 08:00*
POST-SHUTDOWN POST-SHUTDOW LEAK TEST SD-JL-2000
LEAK TEST (JOINTLY WITH QP OPERATION)
SYSTEM MODIFICATIONS MODIFI ESD / DCS MARSHALLING MARS CABINET JM-MOD-001 ISOLATE 24V DC DISTRIBUTION
Feb 1
Mar 2
Apr 3
May 4
Page 4 of5 Jun 5
2017 Jul 6
Aug 7
Sep 8
Oct 9
Nov 10
Dec 11
29-Nov-18 Jan 12
Feb 13
Mar 14
Apr 15
May 16
Jun 17
2018 Jul 18
Aug 19
13:39 Sep 20
Oct 21
Nov 22
Dec 23
Jan 24
2019 Feb Mar 25 26
Apr 27
Page 57 of 170
TIE-IN SCHEDULE - (JALM) Activity ID
Activity Name
TIE-IN SCHEDULE - (JALM) OD
Act. Fin / F-C Fin
Act.Start / F-C Start
JM-MOD-002
INSTALLATION OF FF CARD AND BARRIOR FOR AI SIGNAL
4.00
06-Mar-19 16:00
06-Mar-19 10:00
JM-MOD-003
INSTALL AI, DI, DO CARDS
4.00
06-Mar-19 22:00
06-Mar-19 16:00
JM-MOD-004
INTERNAL WIRING FOR COMPONENTS
6.00
07-Mar-19 06:00
06-Mar-19 22:00
JM-MOD-005
CONTINUITY CHECK FOR NEW WIRING
2.00
07-Mar-19 10:00
07-Mar-19 08:00
18.00 2.00
08-Mar-19 12:00 07-Mar-19 12:00
07-Mar-19 10:00 07-Mar-19 10:00
F&G MARSHALLING MARSHALLI CABINET JM-MOD-006 ISOLATE 24V DC DISTRIBUTION JM-MOD-007
INSTAL FF CARD AND BARRIOR FOR AI SIGNAL
4.00
07-Mar-19 18:00
07-Mar-19 14:00
JM-MOD-008
INSTALL AI, DI, DO CARDS
4.00
08-Mar-19 02:00
07-Mar-19 20:00
JM-MOD-009
INTERNAL WIRING FOR COMPONENTS
6.00
08-Mar-19 10:00
08-Mar-19 02:00
JM-MOD-010
CONTINUITY CHECK FOR NEW WIRING
2.00
08-Mar-19 12:00
08-Mar-19 10:00
20.00 2.00
09-Mar-19 04:00 08-Mar-19 02:00
07-Mar-19 22:00 07-Mar-19 22:00
ESD / DCS AUX CONSOLE C JM-MOD-011 HOLE PROVISION FOR NEW ESD PUSH BUTTON JM-MOD-012
INSTALLATION OF NEW BUTTON AND MAINTENANCE OVERRIDE
4.00
08-Mar-19 06:00
08-Mar-19 02:00
JM-MOD-013
INSTALLATION OF NEW TB
4.00
08-Mar-19 12:00
08-Mar-19 08:00
JM-MOD-014
INTERNAL WIRING FROM NEW SWITCH TO NEW TB
8.00
09-Mar-19 02:00
08-Mar-19 14:00
JM-MOD-015
CONTINUITY TEST
F&G AUX CONSOLE CONSO JM-MOD-016 HOLE PROVISION FOR NEW ESD PUSH BUTTON
2.00
09-Mar-19 04:00
09-Mar-19 02:00
18.00 2.00
10-Mar-19 06:00 09-Mar-19 06:00
09-Mar-19 04:00 09-Mar-19 04:00
JM-MOD-017
INSTALLATION OF NEW BUTTON AND MAINTENANCE OVERRIDE
4.00
09-Mar-19 12:00
09-Mar-19 08:00
JM-MOD-018
INSTALLATION OF NEW TB
4.00
09-Mar-19 18:00
09-Mar-19 14:00
JM-MOD-019
INTERNAL WIRING FROM NEW SWITCH TO NEW TB
6.00
10-Mar-19 04:00
09-Mar-19 20:00
JM-MOD-020
CONTINUITY TEST
2.00
10-Mar-19 06:00
10-Mar-19 04:00
SOFTWARE MODIFICATION MOD JM-MOD-021 SOFTWARE MODIFICATION FOR DCS / ESD / F&G
24.00 24.00
11-Mar-19 18:00 11-Mar-19 18:00
10-Mar-19 08:00 10-Mar-19 08:00
PUNCHLIST JM-MOD-022
36.00 36.00
14-Mar-19 02:00 14-Mar-19 02:00
11-Mar-19 20:00 11-Mar-19 20:00
FINAL CHECK AND PUNCH LIST
Feb 1
Mar 2
Apr 3
May 4
Page 5 of5 Jun 5
2017 Jul 6
Aug 7
Sep 8
Oct 9
Nov 10
Dec 11
29-Nov-18 Jan 12
Feb 13
Mar 14
Apr 15
May 16
Jun 17
2018 Jul 18
Aug 19
13:39 Sep 20
Oct 21
Nov 22
Dec 23
Jan 24
2019 Feb Mar 25 26
Apr 27
Page 58 of 170
PROJECT PLANNING PACKAGE
Attachment 4
PROGRESS TABLE – WEIGHTAGE FACTOR LEV - II
Page 59 of 170
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" PROJECT No. 3963
REV-D
JOB TITLE : "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" CLIENT
: QATAR PETROLEUM
25-Oct-18
BASELINE PLAN
REVISED PLAN
OVERALL PROJECT PREVIOUS WEEK
S. No.
DESCRIPTION
CURRENT WEEK
UP TO DATE
PREVIOUS WEEK
CURRENT WEEK
UP TO DATE
REL. WT. %
PLANNED
ACTUAL
DEV.
PLANNED
ACTUAL
DEV.
PLANNED
ACTUAL
DEV.
PLANNED
ACTUAL
DEV.
PLANNED
ACTUAL
DEV.
PLANNED
ACTUAL
DEV.
1
ENGINEERING PHASE
3.98%
95.00%
94.64%
-0.36%
0.00%
0.00%
0.00%
95.00%
94.64%
-0.36%
94.64%
94.64%
0.00%
0.00%
0.00%
0.00%
94.64%
94.64%
0.00%
2
PROCUREMENT PHASE
65.02%
100.00%
89.55%
-10.45%
0.00%
0.00%
0.00%
100.00%
89.55%
-10.45%
89.55%
89.55%
0.00%
0.00%
0.00%
0.00%
89.55%
89.55%
0.00%
3
CONSTRUCTION PHASE
21.00%
82.78%
24.94%
-57.84%
3.79%
0.02%
-3.78%
86.57%
24.96%
-61.61%
24.94%
24.94%
0.00%
0.02%
0.02%
0.00%
24.96%
24.96%
0.00%
4
PRECOMMISSIONING & COMMISSIONING
8.00%
30.87%
0.21%
-30.66%
6.35%
0.09%
-6.26%
37.22%
0.30%
-36.92%
0.21%
0.21%
0.00%
0.09%
0.09%
0.00%
0.30%
0.30%
0.00%
5
CLOSE-OUT DOCUMENTS
2.00%
2.70%
0.00%
-2.70%
1.89%
0.00%
-1.89%
4.59%
0.00%
-4.59%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
88.71%
67.24%
-21.46%
1.34%
0.01%
-1.33%
90.05%
67.26%
-22.80%
67.24%
67.24%
0.00%
0.01%
0.01%
0.00%
67.26%
67.26%
0.00%
Overall Project
Page 60 of 170
PROJECT PLANNING PACKAGE
Attachment 5
S-CURVES
Page 61 of 170
QATAR BRANCH 0.19% 0.05% 0.59% 0.21% 2.28% 2.76% 2.04% 1.05% 1.34% 2.84% 0.11% 0.69% 1.96% 2.61% 1.76% 0.38% 0.00% 0.59% 0.49% 0.52% 4.03% 1.27% 4.40% 1.91% 1.73% 2.92% 0.19% 0.19% 0.01%
28.31% 28.36% 28.95% 29.16% 31.44% 34.21% 36.25% 37.30% 38.64% 41.47% 41.58% 42.28% 44.23% 46.85% 48.61% 48.99% 48.99% 49.58% 50.07% 50.59% 54.63% 55.89% 60.30% 62.21% 63.94% 66.87% 67.06% 67.24% 67.26%
0.14%
11.93%
0.16%
0.32%
11.79%
28.13%
0.08%
11.47%
0.69%
0.89%
11.40%
27.97%
1.23%
0.31%
0.10%
9.28% 10.51%
0.28%
0.11%
9.18%
27.28%
0.10%
9.07%
Overall Project Progress S-Curve
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION DATE:
1.03% 0.50% 0.87% 0.24% 0.26% 0.24% 0.27% 0.25% 0.23% 0.23% 0.23% 0.39%
97.65% 97.90% 98.16% 98.40% 98.67% 98.92% 99.16% 99.38% 99.61% 100.00%
0.53%
94.62%
96.78%
0.32%
94.09%
96.28%
0.37%
93.77%
0.63%
0.61%
93.40%
95.25%
0.61%
92.79%
2.10%
88.22%
0.59%
1.55%
86.12%
0.43%
2.23%
84.57%
92.19%
2.21%
82.34%
91.59%
2.37%
80.13%
0.42%
1.46%
77.76%
91.16%
1.26%
76.29%
0.66%
3.63%
75.03%
90.74%
0.94%
71.41%
0.62%
1.32%
70.47%
0.69%
0.60%
69.14%
90.07%
0.57%
68.55%
89.46%
0.50%
67.98%
0.54%
0.23%
67.48%
88.76%
0.01%
0.19%
0.19%
2.92%
1.73%
1.91%
4.40%
67.26%
67.24%
67.06%
66.87%
63.94%
62.21%
60.30%
67.26%
67.24%
67.06%
66.87%
63.94%
62.21%
60.30%
0.01%
0.19%
0.19%
2.92%
1.73%
1.91%
4.40%
1.27%
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 " 25-Oct-18
Page 62 of 170
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.10%
0.18%
0.18%
0.18%
0.17%
0.16%
0.16%
0.16%
0.18%
0.44%
0.88%
0.75%
1.15%
1.31%
1.23%
1.53%
1.19%
1.34%
1.17%
1.34%
1.32%
0.87%
1.07%
0.98%
0.54%
27-Sep-18 4-Oct-18 11-Oct-18 18-Oct-18 25-Oct-18 1-Nov-18 8-Nov-18 15-Nov-18 22-Nov-18 29-Nov-18 6-Dec-18 13-Dec-18 20-Dec-18 27-Dec-18 3-Jan-19 10-Jan-19 17-Jan-19
76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126
25-Jul-19
18-Jul-19
11-Jul-19
4-Jul-19
27-Jun-19
20-Jun-19
13-Jun-19
6-Jun-19
30-May-19
23-May-19
16-May-19
9-May-19
2-May-19
25-Apr-19
18-Apr-19
11-Apr-19
4-Apr-19
28-Mar-19
21-Mar-19
14-Mar-19
7-Mar-19
28-Feb-19
21-Feb-19
14-Feb-19
7-Feb-19
31-Jan-19
24-Jan-19
20-Sep-18
2-Aug-18
13-Sep-18
26-Jul-18
6-Sep-18
19-Jul-18
25‐Jul‐19
18‐Jul‐19
11‐Jul‐19
4‐Jul‐19
27‐Jun‐19
20‐Jun‐19
13‐Jun‐19
6‐Jun‐19
30‐May‐19
23‐May‐19
16‐May‐19
9‐May‐19
2‐May‐19
25‐Apr‐19
18‐Apr‐19
11‐Apr‐19
4‐Apr‐19
28‐Mar‐19
21‐Mar‐19
14‐Mar‐19
7‐Mar‐19
28‐Feb‐19
21‐Feb‐19
14‐Feb‐19
7‐Feb‐19
31‐Jan‐19
24‐Jan‐19
17‐Jan‐19
10‐Jan‐19
3‐Jan‐19
27‐Dec‐18
20‐Dec‐18
13‐Dec‐18
6‐Dec‐18
29‐Nov‐18
22‐Nov‐18
15‐Nov‐18
8‐Nov‐18
1‐Nov‐18
25‐Oct‐18
18‐Oct‐18
11‐Oct‐18
4‐Oct‐18
27‐Sep‐18
20‐Sep‐18
13‐Sep‐18
6‐Sep‐18
30‐Aug‐18
23‐Aug‐18
16‐Aug‐18
9‐Aug‐18
2‐Aug‐18
26‐Jul‐18
19‐Jul‐18
12‐Jul‐18
5‐Jul‐18
28‐Jun‐18
21‐Jun‐18
14‐Jun‐18
7‐Jun‐18
31‐May‐18
24‐May‐18
17‐May‐18
10‐May‐18
3‐May‐18
26‐Apr‐18
19‐Apr‐18
12‐Apr‐18
5‐Apr‐18
29‐Mar‐18
22‐Mar‐18
15‐Mar‐18
8‐Mar‐18
1‐Mar‐18
22‐Feb‐18
15‐Feb‐18
8‐Feb‐18
1‐Feb‐18
25‐Jan‐18
18‐Jan‐18
11‐Jan‐18
4‐Jan‐18
28‐Dec‐17
21‐Dec‐17
14‐Dec‐17
7‐Dec‐17
30‐Nov‐17
23‐Nov‐17
16‐Nov‐17
9‐Nov‐17
2‐Nov‐17
26‐Oct‐17
19‐Oct‐17
12‐Oct‐17
5‐Oct‐17
28‐Sep‐17
21‐Sep‐17
14‐Sep‐17
7‐Sep‐17
31‐Aug‐17
24‐Aug‐17
17‐Aug‐17
10‐Aug‐17
3‐Aug‐17
27‐Jul‐17
20‐Jul‐17
13‐Jul‐17
6‐Jul‐17
29‐Jun‐17
22‐Jun‐17
15‐Jun‐17
8‐Jun‐17
1‐Jun‐17
25‐May‐17
18‐May‐17
11‐May‐17
4‐May‐17
27‐Apr‐17
20‐Apr‐17
13‐Apr‐17
70.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
99.90%
99.72%
99.55%
99.37%
99.19%
99.03%
98.87%
98.70%
98.53%
98.08%
97.20%
96.45%
95.30%
94.00%
92.77%
91.24%
90.05%
88.71%
87.54%
86.20%
84.88%
84.02%
82.95%
81.97%
12-Jul-18
75
55.89%
5-Jul-18
74
1.27%
28-Jun-18
73
55.89%
21-Jun-18
72
30-Aug-18
14-Jun-18
71 0.42%
7-Jun-18
70
81.43%
31-May-18
69
4.03%
24-May-18
68
54.63%
17-May-18
67
4.03%
10-May-18
66
54.63%
3-May-18
65
23-Aug-18
26-Apr-18
64 0.65%
19-Apr-18
63
81.02%
12-Apr-18
62
0.52%
5-Apr-18
61
50.59%
29-Mar-18
60
0.52%
22-Mar-18
59
50.59%
15-Mar-18
58
9-Aug-18
8-Mar-18
57
16-Aug-18
1-Mar-18
56 0.36%
22-Feb-18
55 0.35%
15-Feb-18
54
80.37%
8-Feb-18
53
80.01%
1-Feb-18
52
0.49%
25-Jan-18
51
0.59%
18-Jan-18
50
50.07%
1.58%
1.66%
0.46%
1.27%
2.21%
0.54%
0.39%
0.28%
0.33%
0.37%
0.37%
0.39%
4.33%
2.21%
0.26%
3.15%
2.43%
4.34%
3.06%
0.45%
2.27%
1.19%
2.25%
1.01%
0.82%
2.32%
0.83%
2.50%
0.45%
49
49.58%
79.65%
78.07%
76.41%
75.94%
74.68%
72.47%
71.93%
71.54%
71.26%
70.94%
70.56%
70.20%
69.81%
65.48%
63.27%
63.01%
59.87%
57.44%
53.10%
50.04%
49.60%
47.32%
46.13%
43.88%
42.87%
42.05%
39.73%
38.89%
36.40%
48
0.49%
0.00%
0.38%
1.76%
2.61%
1.96%
0.69%
0.11%
2.84%
1.34%
1.05%
2.04%
2.76%
2.28%
0.21%
0.59%
0.05%
0.19%
0.16%
0.69%
0.31%
0.28%
3.18%
0.10%
0.55%
0.49%
0.51%
0.78%
0.23%
2.56%
28-Dec-17
47
0.59%
48.99%
48.99%
48.61%
46.85%
44.23%
42.28%
41.58%
41.47%
38.64%
37.30%
36.25%
34.21%
31.44%
29.16%
28.95%
28.36%
28.31%
28.13%
27.97%
27.28%
26.97%
26.69%
23.51%
23.41%
22.86%
22.37%
21.86%
21.08%
20.85%
21-Dec-17
46
50.07%
0.00%
0.38%
1.76%
2.61%
1.96%
0.69%
0.11%
2.84%
1.34%
1.05%
2.04%
2.76%
2.28%
0.21%
0.59%
0.05%
0.19%
0.16%
0.69%
0.31%
0.28%
3.18%
0.10%
0.55%
0.49%
0.51%
0.78%
0.23%
2.56%
14-Dec-17
45
49.58%
48.99%
48.99%
48.61%
46.85%
44.23%
42.28%
41.58%
41.47%
38.64%
37.30%
36.25%
34.21%
31.44%
29.16%
28.95%
28.36%
28.31%
28.13%
27.97%
27.28%
26.97%
26.69%
23.51%
23.41%
22.86%
22.37%
21.86%
21.08%
20.85%
7-Dec-17
4-Jan-18
30-Nov-17
44
11-Jan-18
23-Nov-17
43 2.39%
16-Nov-17
42 0.95%
9-Nov-17
41
35.94%
2-Nov-17
40
33.55%
26-Oct-17
39
1.50%
19-Oct-17
38
0.58%
5-Oct-17 12-Oct-17
28-Sep-17
37
18.29%
1.38%
1.28%
1.19%
3.28%
1.33%
0.27%
2.13%
0.48%
0.29%
2.92%
0.53%
1.43%
0.89%
0.54%
21-Sep-17
36
16.78%
32.60%
31.22%
29.94%
28.75%
25.47%
24.14%
23.87%
21.74%
21.26%
20.97%
18.05%
17.52%
16.09%
15.20%
0.38%
7-Sep-17 14-Sep-17
35
1.50%
1.77%
2.00%
0.21%
0.06%
0.23%
0.14%
0.32%
0.08%
0.89%
1.23%
0.10%
0.11%
0.10%
0.22%
14.66%
1.70%
0.98%
34
0.58%
16.21%
14.44%
12.43%
12.22%
12.16%
11.93%
11.79%
11.47%
11.40%
10.51%
9.28%
9.18%
9.07%
8.97%
0.19%
14.28%
12.58%
31-Aug-17
33
18.29%
1.77%
2.00%
0.21%
0.06%
0.23%
0.14%
0.32%
0.08%
0.89%
1.23%
0.10%
0.11%
0.10%
0.22%
8.75%
0.49%
0.21%
0.72%
24-Aug-17
32
16.78%
16.21%
14.44%
12.43%
12.22%
12.16%
11.93%
11.79%
11.47%
11.40%
10.51%
9.07%
8.97%
0.19%
8.56%
8.07%
11.60%
0.52%
17-Aug-17
31
26.97%
0.22%
8.97%
8.75%
0.49%
0.21%
0.05%
10.87%
0.50%
3-Aug-17 10-Aug-17
30
3.18%
0.19%
8.75%
8.56%
8.07%
7.86%
0.23%
10.35%
1.87%
0.25%
27-Jul-17
29
26.69%
0.49%
8.56%
0.05%
7.81%
0.36%
9.85%
7.98%
20-Jul-17
28
0.10%
0.21%
8.07%
7.86%
0.23%
7.58%
0.95%
2.15%
0.20%
13-Jul-17
27
23.510%
0.05%
7.86%
7.81%
0.36%
7.22%
6.27%
7.73%
1.42%
6-Jul-17
26
0.55%
0.23%
7.81%
7.58%
0.95%
2.15%
1.04%
7.53%
0.43%
29-Jun-17
25
0.49%
0.36%
7.58%
7.22%
6.27%
4.12%
0.22%
6.12%
0.30%
22-Jun-17
24
23.41%
0.95%
7.22%
1.04%
3.08%
0.16%
5.69%
1.57%
0.10%
15-Jun-17
23
22.86%
2.15%
6.27%
4.12%
0.22%
2.86%
0.17%
5.39%
3.82%
8-Jun-17
22
0.51%
1.04%
4.12%
3.08%
0.16%
2.70%
0.02%
0.63%
1.30%
1-Jun-17
21
0.78%
0.22%
3.08%
2.86%
0.17%
2.53%
2.51%
3.71%
0.18%
25-May-17
20
22.37%
0.16%
2.86%
2.70%
0.02%
0.63%
0.52%
2.42%
0.59%
0.09%
18-May-17
19
21.86%
0.17%
2.70%
2.53%
2.51%
1.89%
0.10%
2.24%
1.65%
11-May-17
18
0.23%
0.02%
2.53%
0.52%
1.37%
0.52%
0.08%
1.01%
4-May-17
17
2.56%
0.63%
2.51%
1.89%
0.10%
1.27%
0.75%
1.56%
0.16%
27-Apr-17
16
21.08%
0.52%
1.89%
1.37%
0.52%
0.08%
0.07%
0.55%
0.09%
0.02%
15
20.85%
0.10%
1.37%
1.27%
0.75%
0.67%
0.15%
0.39%
0.30%
20-Apr-17
14
6‐Apr‐17
13-Apr-17
13
1.50%
0.52%
1.27%
0.07%
0.60%
0.27%
0.05%
0.10%
30‐Mar‐17
6-Apr-17
12
0.58%
0.08%
0.75%
0.67%
0.15%
0.45%
0.19%
0.28%
0.03%
23‐Mar‐17
30-Mar-17
11
18.29%
0.07%
0.67%
0.60%
0.27%
0.05%
0.02%
0.19%
0.11%
16‐Mar‐17
23-Mar-17
10
16.78%
0.15%
0.60%
0.45%
0.19%
0.14%
0.03%
0.16%
0.04%
0.00%
9
1.77%
0.27%
0.45%
0.02%
0.11%
0.03%
0.05%
0.01%
2‐Mar‐17 9‐Mar‐17
9-Mar-17 16-Mar-17
8
2.00%
0.05%
0.19%
0.14%
0.03%
0.08%
0.03%
0.02%
0.01%
7
16.21%
0.02%
0.14%
0.11%
0.03%
0.05%
0.02%
0.01%
2-Mar-17
6
14.44%
0.03%
0.11%
0.08%
0.03%
0.02%
0.01%
0.00%
0.00%
5
0.21%
0.03%
0.08%
0.05%
0.02%
0.01%
0.00%
0.00%
4
12.43%
0.03%
0.05%
0.01%
0.00%
0.00%
3
0.06%
0.02%
0.02%
Rev. Recovery Cum. Plan
0.01%
Rev. Recovery Weekly Plan
0.00%
B/L Cum. Plan
2
12.22%
0.01%
0.01%
Cum Actual
0.00% 1
0.00%
Weekly Actual
0.00%
WEEK
0.00%
Overall Project
0.23%
9.28%
0.00%
0.00%
12.16%
9.18%
0.00%
Rev. Recovery Cum. Actual
0.00%
B/L Weekly Plan
0.00%
Rev. Recovery Weekly Actual
0.00%
100.00%
Overall Progress "S" curve
90.00%
80.00% B/L Cum. Plan
60.00% Rev. Recovery Cum. Plan
Rev. Recovery Cum. Actual
50.00%
40.00%
30.00%
20.00%
10.00%
QATAR BRANCH 91.01% 91.80% 92.05% 92.32% 92.47% 92.64% 92.84% 93.34% 93.34% 93.70% 93.70% 93.76% 93.76% 93.84% 93.84% 93.92% 93.92% 94.12% 94.12% 94.15% 94.15% 94.15% 94.17% 94.36% 94.48% 94.53% 94.58% 94.58% 94.64% 94.64% 94.64%
0.25% 0.27% 0.15% 0.17% 0.20% 0.50% 0.00% 0.37% 0.00% 0.05% 0.00% 0.08% 0.00% 0.08% 0.00% 0.20% 0.00% 0.03% 0.00% 0.00% 0.02% 0.19% 0.12% 0.04% 0.05% 0.00% 0.07% 0.00% 0.00%
65.49%
1.84%
0.79%
63.65%
2.67%
0.12%
60.99%
1.90%
90.90%
59.09%
2.22%
1.38%
56.87%
2.89%
89.52%
53.98%
2.44%
0.69%
51.54%
2.76%
88.82%
48.78%
2.59%
88.375%
46.18%
2.79%
0.45%
43.39%
2.30%
Overall Engineering Progress S-Curve "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 "
94.64% 94.64% 94.88% 94.88% 94.88% 94.93% 95.00%
0.00% 0.00% 0.24% 0.00% 0.00% 0.06% 0.07%
DATE:
Page 63 of 170
95.00% 95.00% 100.00% 100.00% 100.00%
5.00%
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
3-Nov-18
0.00% 0.00%
0.00%
0.00%
95.00%
95.00%
95.00%
100
0.00%
99
25-Jul-19
18-Jul-19
11-Jul-19
31-Jan-19
24-Jan-19
98 95.00%
95.00%
97
0.00%
0.00%
27-Dec-18
96
0.00%
20-Dec-18
95
0.00%
13-Dec-18
94
17-Jan-19
6-Dec-18
4‐Apr‐19
25‐Jul‐19
18‐Jul‐19
11‐Jul‐19
4‐Jul‐19
27‐Jun‐19
20‐Jun‐19
13‐Jun‐19
6‐Jun‐19
30‐May‐19
23‐May‐19
16‐May‐19
9‐May‐19
2‐May‐19
25‐Apr‐19
18‐Apr‐19
11‐Apr‐19
80.00%
95.00%
29-Nov-18
28‐Mar‐19
21‐Mar‐19
14‐Mar‐19
7‐Mar‐19
28‐Feb‐19
21‐Feb‐19
14‐Feb‐19
7‐Feb‐19
31‐Jan‐19
24‐Jan‐19
17‐Jan‐19
10‐Jan‐19
3‐Jan‐19
27‐Dec‐18
20‐Dec‐18
13‐Dec‐18
6‐Dec‐18
29‐Nov‐18
22‐Nov‐18
15‐Nov‐18
8‐Nov‐18
1‐Nov‐18
25‐Oct‐18
18‐Oct‐18
11‐Oct‐18
4‐Oct‐18
27‐Sep‐18
20‐Sep‐18
13‐Sep‐18
6‐Sep‐18
30‐Aug‐18
23‐Aug‐18
16‐Aug‐18
9‐Aug‐18
2‐Aug‐18
26‐Jul‐18
19‐Jul‐18
12‐Jul‐18
5‐Jul‐18
28‐Jun‐18
21‐Jun‐18
14‐Jun‐18
7‐Jun‐18
31‐May‐18
24‐May‐18
17‐May‐18
10‐May‐18
3‐May‐18
26‐Apr‐18
19‐Apr‐18
12‐Apr‐18
5‐Apr‐18
29‐Mar‐18
22‐Mar‐18
15‐Mar‐18
8‐Mar‐18
1‐Mar‐18
22‐Feb‐18
15‐Feb‐18
8‐Feb‐18
1‐Feb‐18
25‐Jan‐18
18‐Jan‐18
11‐Jan‐18
4‐Jan‐18
28‐Dec‐17
21‐Dec‐17
14‐Dec‐17
7‐Dec‐17
30‐Nov‐17
23‐Nov‐17
16‐Nov‐17
9‐Nov‐17
2‐Nov‐17
26‐Oct‐17
19‐Oct‐17
12‐Oct‐17
5‐Oct‐17
28‐Sep‐17
21‐Sep‐17
14‐Sep‐17
7‐Sep‐17
31‐Aug‐17
24‐Aug‐17
17‐Aug‐17
10‐Aug‐17
3‐Aug‐17
27‐Jul‐17
20‐Jul‐17
13‐Jul‐17
6‐Jul‐17
29‐Jun‐17
22‐Jun‐17
15‐Jun‐17
8‐Jun‐17
1‐Jun‐17
25‐May‐17
18‐May‐17
11‐May‐17
4‐May‐17
27‐Apr‐17
20‐Apr‐17
13‐Apr‐17
6‐Apr‐17
30‐Mar‐17
23‐Mar‐17
16‐Mar‐17
9‐Mar‐17
2‐Mar‐17
90.00%
0.00%
22-Nov-18
93
3-Jan-19
15-Nov-18
92
10-Jan-19
8-Nov-18
91 95.00%
1-Nov-18
90 95.00%
25-Oct-18
89
0.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
18-Oct-18
88
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
95.00%
95.00%
95.00%
95.00%
87
95.00%
94.64%
0.00%
0.00%
0.00%
0.00%
0.00%
86
0.00%
94.64%
0.00%
94.64%
94.64%
85
95.00%
94.64%
0.00%
0.00%
0.00%
84
0.00%
94.64%
94.64% 0.00%
0.00%
95.00%
83
0.00%
82
94.64%
27-Sep-18
81
0.07%
20-Sep-18
80
94.64%
13-Sep-18
79
0.07%
6-Sep-18
78
4-Oct-18
30-Aug-18
77
11-Oct-18
23-Aug-18
76 95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
16-Aug-18
75
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
95.00%
28-Jun-18
74
94.58%
94.58%
94.53%
94.48%
94.36%
94.17%
94.15%
0.00%
21-Jun-18
73
0.00%
0.05%
0.04%
0.12%
0.19%
0.02%
0.00%
94.15%
14-Jun-18
72
94.58%
94.58%
94.53%
94.48%
94.36%
94.17%
94.15%
0.00%
7-Jun-18
71
0.00%
0.05%
0.04%
0.12%
0.19%
0.02%
0.00%
94.15%
31-May-18
70
0.00%
24-May-18
69
9-Aug-18
17-May-18
68 95.00%
10-May-18
67 95.00%
3-May-18
66
0.00%
26-Apr-18
65
0.00%
19-Apr-18
64
94.15%
12-Apr-18
63
94.12%
5-Apr-18
62
0.03%
29-Mar-18
61
0.00%
22-Mar-18
60
94.15%
15-Mar-18
59
94.12%
8-Mar-18
58
0.03%
1-Mar-18
57
0.00%
22-Feb-18
56
2-Aug-18
15-Feb-18
55
26-Jul-18
8-Feb-18
54 95.00%
1-Feb-18
53
0.00%
25-Jan-18
52
94.12%
18-Jan-18
51
0.20%
11-Jan-18
50
94.12%
4-Jan-18
49
0.20%
28-Dec-17
48
19-Jul-18
21-Dec-17
47 95.00%
14-Dec-17
46
0.00%
7-Dec-17
45
93.92%
30-Nov-17
44
0.00%
23-Nov-17
43
93.92%
16-Nov-17
42
0.00%
9-Nov-17
41
5-Jul-18
2-Nov-17
40
12-Jul-18
26-Oct-17
39 95.00%
19-Oct-17
38 95.00%
12-Oct-17
37
0.00%
5-Oct-17
36
0.00%
28-Sep-17
35
93.92%
21-Sep-17
34
93.84%
7-Sep-17 14-Sep-17
33
0.08%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
87.64%
80.23%
31-Aug-17
32
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.36%
7.40%
5.63%
24-Aug-17
31
93.92%
93.84%
93.76%
93.76%
93.70%
93.70%
93.34%
93.34%
92.84%
92.64%
92.47%
92.32%
92.05%
91.80%
91.01%
90.90%
89.52%
88.82%
88.38%
87.29%
83.08%
82.34%
80.89%
79.03%
76.32%
75.14%
73.44%
72.47%
71.83%
70.05%
69.05%
67.61%
65.49%
63.65%
60.99%
59.09%
56.87%
53.98%
51.54%
48.78%
46.18%
43.39%
41.09%
40.04%
74.60%
17-Aug-17
30
93.84%
0.08%
0.00%
0.05%
0.00%
0.37%
0.00%
0.50%
0.20%
0.17%
0.15%
0.27%
0.25%
0.79%
0.12%
1.38%
0.69%
0.45%
1.09%
4.21%
0.75%
1.45%
1.85%
2.71%
1.19%
1.69%
0.97%
0.64%
1.78%
1.00%
1.44%
2.12%
1.84%
2.67%
1.90%
2.22%
2.89%
2.44%
2.76%
2.59%
2.79%
2.30%
1.06%
0.38%
6.60%
68.01%
63.43%
10-Aug-17
29
0.08%
93.84%
93.76%
93.76%
93.70%
93.70%
93.34%
93.34%
92.84%
92.64%
92.47%
92.32%
92.05%
91.80%
91.01%
90.90%
89.52%
88.82%
88.38%
87.29%
83.08%
82.34%
80.89%
79.03%
76.32%
75.14%
73.44%
72.47%
71.83%
70.05%
69.05%
67.61%
65.49%
63.65%
60.99%
59.09%
56.87%
53.98%
51.54%
48.78%
46.18%
43.39%
41.09%
40.04%
39.66%
4.58%
4.06%
3-Aug-17
28
0.00%
0.08%
0.00%
0.05%
0.00%
0.37%
0.00%
0.50%
0.20%
0.17%
0.15%
0.27%
0.25%
0.79%
0.12%
1.38%
0.69%
0.45%
1.09%
4.21%
0.75%
1.45%
1.85%
2.71%
1.19%
1.69%
0.97%
0.64%
1.78%
1.00%
1.44%
2.12%
1.84%
2.67%
1.90%
2.22%
2.89%
2.44%
2.76%
2.59%
2.79%
2.30%
1.06%
0.38%
1.24%
38.42%
36.74%
59.37%
27-Jul-17
27
1.09%
41.09%
1.06%
39.66%
1.69%
1.48%
4.69%
54.68%
20-Jul-17
26
87.29%
40.04%
0.38%
1.24%
38.42%
36.74%
35.25%
4.36%
50.32%
45.35%
25
4.21%
39.66%
1.24%
1.69%
1.48%
2.05%
33.20%
4.97%
4.45%
6-Jul-17 13-Jul-17
24
83.08%
38.42%
1.69%
35.25%
3.74%
29.45%
27.38%
40.90%
37.29%
29-Jun-17
23
0.75%
36.74%
1.48%
2.05%
33.20%
2.07%
4.06%
3.61%
5.24%
22-Jun-17
22
82.34%
35.25%
2.05%
3.74%
29.45%
27.38%
23.32%
21.99%
32.04%
15-Jun-17
21
1.45%
33.20%
3.74%
2.07%
4.06%
1.33%
1.74%
4.04%
28.01%
8-Jun-17
20
80.89%
29.45%
2.07%
23.32%
21.99%
20.25%
2.54%
25.47%
1-Jun-17
19
1.85%
27.38%
4.06%
1.33%
1.74%
0.42%
19.83%
4.13%
21.34%
16.84%
18
79.03%
23.32%
1.33%
20.25%
2.28%
17.55%
4.50%
2.75%
25-May-17
17
2.71%
21.99%
1.74%
0.42%
19.83%
1.89%
15.65%
14.37%
14.09%
18-May-17
16
76.32%
20.25%
0.42%
2.28%
17.55%
1.28%
1.84%
2.23%
11.85%
15
1.19%
19.83%
2.28%
1.89%
15.65%
14.37%
12.54%
3.10%
4-May-17 11-May-17
14
75.14%
17.55%
1.89%
1.28%
1.84%
2.08%
10.45%
8.76%
6.02%
13
73.44%
15.65%
1.28%
12.54%
1.85%
2.74%
2.19%
27-Apr-17
12
1.69%
14.37%
1.84%
2.08%
10.45%
8.60%
6.11%
20-Apr-17
11
0.97%
12.54%
2.08%
1.85%
2.50%
1.76%
3.83%
13-Apr-17
10
72.47%
10.45%
1.85%
8.60%
6.11%
0.59%
3.24%
2.19%
6-Apr-17
9
2.49%
4.35%
1.05%
0.65%
30-Mar-17
8
1.76%
0.85%
3.50%
2.88%
1.54%
23-Mar-17
7
71.83%
8.60%
2.49%
4.35%
0.62%
0.81%
0.28%
1.26%
16-Mar-17
6
0.64%
6.11%
1.76%
0.85%
3.50%
2.88%
2.08%
0.94%
0.32%
0.23%
9-Mar-17
5
1.78%
4.35%
0.85%
0.62%
0.80%
0.68%
1.38%
0.10%
0.20%
2-Mar-17
4
70.05%
3.50%
0.62%
2.08%
0.80%
0.58%
0.13%
0.02%
0.00%
3
1.00%
2.88%
0.80%
0.70%
1.38%
0.45%
0.13%
0.02%
0.00% 2
69.05%
2.08%
0.70%
0.80%
0.58%
0.13%
0.00%
0.00% 1
1.44%
1.38%
0.80%
0.45%
0.13%
0.00%
0.00%
WEEK
67.61%
0.58%
0.00%
Overall Project
2.12%
0.13%
Rev. Weekly Actual
0.45%
Rev. Cum. Actual
0.13%
Rev. Weekly Plan
0.00%
Weekly Actual
0.00%
Rev. Cum. Plan
0.00%
Cum Actual
0.00%
B/L Weekly Plan
0.00%
B/L Cum. Plan
0.00%
0.00%
0.00%
100.00%
B/L Cum. Plan
Cum Actual
70.00%
Rev. Cum. Plan
Rev. Cum. Actual
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
Overall Engineering Progress "S" curve
101 124 125 126
Rev. Recovery Cum. Actual
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.32% 0.39% 0.39% 0.39% 1.08% 1.15% 1.83% 2.65% 2.65% 2.81% 2.98% 3.06% 4.54% 7.62% 8.95% 9.41% 9.66% 9.66% 9.96% 10.64% 10.80% 10.96% 10.96% 10.96% 10.96% 12.68% 13.91% 13.91% 14.24% 14.34% 14.57% 14.57% 14.82% 17.78% 20.34% 21.04% 23.22% 27.07% 27.23% 28.31% 28.85% 29.51% 30.08% 30.151% 34.96% 35.31% 35.52% 36.39% 36.49% 36.49% 36.49% 37.32% 37.59% 41.03% 45.19% 48.25% 49.62% 51.25% 55.34% 55.34% 56.27% 59.14% 62.95% 65.42% 65.73% 65.73% 65.73% 66.29% 66.83% 72.79% 74.21% 80.36% 82.74% 85.20% 89.55% 89.55% 89.55% 89.55%
Rev. Recovery Weekly Actual
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.02% 0.30% 0.07% 0.00% 0.00% 0.68% 0.08% 0.68% 0.82% 0.00% 0.15% 0.17% 0.08% 1.48% 3.08% 1.33% 0.46% 0.25% 0.00% 0.30% 0.68% 0.15% 0.17% 0.00% 0.00% 0.00% 1.72% 1.23% 0.00% 0.32% 0.10% 0.23% 0.00% 0.26% 2.95% 2.56% 0.70% 2.18% 3.85% 0.16% 1.09% 0.54% 0.66% 0.57% 0.07% 4.81% 0.35% 0.21% 0.87% 0.10% 0.00% 0.00% 0.83% 0.27% 3.43% 4.17% 3.06% 1.37% 1.63% 4.09% 0.00% 0.93% 2.87% 3.81% 2.47% 0.31% 0.00% 0.00% 0.56% 0.54% 5.96% 1.42% 6.15% 2.38% 2.46% 4.35% 0.00% 0.00% 0.00%
Rev. Recovery Weekly Plan
QATAR BRANCH Overall Procurement Progress S-Curve "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 "
89.57% 90.50% 90.55% 94.82% 95.45% 95.66% 96.74%
0.00% 0.93% 0.05% 4.27% 0.63% 0.21% 1.09%
DATE:
Page 64 of 170
98.37% 100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 1.63% 0.00% 0.00% 0.00% 0.00%
98.37%
89.57%
0.00%
1.63%
89.57%
0.00%
89.55%
89.55%
89.55%
89.55%
85.20%
82.74%
80.36%
74.21%
72.79%
66.83%
66.29%
65.73%
65.73%
65.73%
65.42%
62.95%
59.14%
56.27%
55.34%
55.34%
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
25-Oct-18
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.04%
2.04%
0.00%
1.36%
2.73%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
97.96%
95.91%
95.91%
94.55%
91.82%
91.82%
91.82%
14-Jun-18 21-Jun-18 28-Jun-18 5-Jul-18 12-Jul-18 19-Jul-18 26-Jul-18 2-Aug-18 9-Aug-18 16-Aug-18 23-Aug-18 30-Aug-18 6-Sep-18 13-Sep-18 20-Sep-18 27-Sep-18 4-Oct-18 11-Oct-18 18-Oct-18 25-Oct-18 1-Nov-18 8-Nov-18 15-Nov-18 22-Nov-18 29-Nov-18 6-Dec-18 13-Dec-18 20-Dec-18 27-Dec-18 3-Jan-19 10-Jan-19 17-Jan-19 24-Jan-19
62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ## 101 102 103 104
21-Feb-19
14-Feb-19
7-Feb-19
31-Jan-19
7-Jun-18
26-Apr-18
21‐Feb‐19
14‐Feb‐19
7‐Feb‐19
31‐Jan‐19
24‐Jan‐19
17‐Jan‐19
10‐Jan‐19
3‐Jan‐19
27‐Dec‐18
20‐Dec‐18
13‐Dec‐18
6‐Dec‐18
29‐Nov‐18
22‐Nov‐18
15‐Nov‐18
8‐Nov‐18
1‐Nov‐18
25‐Oct‐18
18‐Oct‐18
11‐Oct‐18
4‐Oct‐18
27‐Sep‐18
20‐Sep‐18
13‐Sep‐18
6‐Sep‐18
30‐Aug‐18
23‐Aug‐18
16‐Aug‐18
9‐Aug‐18
2‐Aug‐18
26‐Jul‐18
19‐Jul‐18
12‐Jul‐18
5‐Jul‐18
28‐Jun‐18
21‐Jun‐18
14‐Jun‐18
7‐Jun‐18
31‐May‐18
24‐May‐18
17‐May‐18
10‐May‐18
3‐May‐18
26‐Apr‐18
19‐Apr‐18
12‐Apr‐18
5‐Apr‐18
29‐Mar‐18
22‐Mar‐18
15‐Mar‐18
8‐Mar‐18
1‐Mar‐18
22‐Feb‐18
15‐Feb‐18
8‐Feb‐18
1‐Feb‐18
25‐Jan‐18
18‐Jan‐18
11‐Jan‐18
4‐Jan‐18
28‐Dec‐17
21‐Dec‐17
14‐Dec‐17
7‐Dec‐17
30‐Nov‐17
23‐Nov‐17
16‐Nov‐17
9‐Nov‐17
2‐Nov‐17
26‐Oct‐17
19‐Oct‐17
12‐Oct‐17
5‐Oct‐17
28‐Sep‐17
21‐Sep‐17
14‐Sep‐17
7‐Sep‐17
31‐Aug‐17
24‐Aug‐17
17‐Aug‐17
10‐Aug‐17
3‐Aug‐17
27‐Jul‐17
20‐Jul‐17
13‐Jul‐17
6‐Jul‐17
29‐Jun‐17
22‐Jun‐17
15‐Jun‐17
8‐Jun‐17
1‐Jun‐17
25‐May‐17
18‐May‐17
80.00%
96.74%
89.57%
0.02%
0.00%
0.00%
0.00%
4.35%
2.46%
2.38%
6.15%
1.42%
5.96%
0.54%
0.56%
0.00%
0.00%
0.31%
2.47%
3.81%
2.87%
0.93%
0.00%
4.09%
91.82%
19-Apr-18
4‐May‐17 11‐May‐17
90.00%
0.00%
89.55%
89.55%
89.55%
89.55%
85.20%
82.74%
80.36%
74.21%
72.79%
66.83%
66.29%
65.73%
65.73%
65.73%
65.42%
62.95%
59.14%
56.27%
55.34%
55.34%
0.00%
0.00%
0.00%
4.35%
2.46%
2.38%
6.15%
1.42%
5.96%
0.54%
0.56%
0.00%
0.00%
0.31%
2.47%
3.81%
2.87%
0.93%
0.00%
4.09%
0.0%
12-Apr-18
61
51.25%
5-Apr-18
60
1.63%
29-Mar-18
59
51.25%
22-Mar-18
58
1.63%
15-Mar-18
57
31-May-18
8-Mar-18
56 91.8%
1-Mar-18
55
0.0%
22-Feb-18
54
49.62%
15-Feb-18
53
1.37%
8-Feb-18
52
49.62%
1-Feb-18
51
1.37%
25-Jan-18
50
24-May-18
18-Jan-18
49
17-May-18
11-Jan-18
48 91.8%
4-Jan-18
47 91.8%
28-Dec-17
46
0.0%
21-Dec-17
45
0.0%
14-Dec-17
44
48.25%
7-Dec-17
43
45.19%
30-Nov-17
42
3.06%
23-Nov-17
41
4.17%
16-Nov-17
40
48.25%
9-Nov-17
39
45.19%
2-Nov-17
38
3.06%
26-Oct-17
37
4.17%
19-Oct-17
36
3-May-18
12-Oct-17
35
10-May-18
5-Oct-17
34 91.8%
28-Sep-17
33 85.6%
21-Sep-17
32
6.3%
14-Sep-17
31
3.0%
7-Sep-17
30
41.03%
31-Aug-17
29
37.59%
24-Aug-17
28
3.43%
82.6%
82.6%
78.23%
74.83%
68.58%
64.37%
64.16%
60.97%
59.60%
56.87%
17-Aug-17
27
0.27%
0.0%
4.3%
3.40%
6.25%
4.21%
0.21%
3.19%
1.37%
2.73%
1.08%
55.79%
54.82%
3.19% 0.96%
51.63%
50.80%
47.54%
47.34%
43.96%
42.74%
40.73%
38.83%
0.84%
3.26%
0.20%
3.37%
1.23%
2.01%
1.90%
1.76%
37.07%
32.29%
1.88% 4.78%
30.41%
30.09%
26.91%
26.26%
25.88%
21.60%
20.94%
18.80%
17.49%
16.72%
16.60%
14.44%
13.27%
12.56%
12.04%
0.32%
3.18%
0.65%
0.38%
4.28%
0.66%
2.14%
1.31%
0.77%
0.12%
2.16%
1.17%
0.71%
0.52%
0.52%
26
41.03%
37.32%
36.49%
36.49%
36.49%
36.39%
35.52%
35.31%
34.96%
30.15%
30.08%
29.51%
28.85%
28.31%
27.23%
27.07%
23.22%
21.04%
20.34%
17.78%
14.82%
14.57%
14.57%
14.34%
14.24%
13.91%
13.91%
12.68%
10.96%
10.96%
10.96%
10.96%
10.80%
10.64%
9.96%
9.66%
9.66%
9.41%
25
37.59%
0.83%
0.00%
0.00%
0.10%
0.87%
0.21%
0.35%
4.81%
0.07%
0.57%
0.66%
0.54%
1.09%
0.16%
3.85%
2.18%
0.70%
2.56%
2.95%
0.26%
0.00%
0.23%
0.10%
0.32%
0.00%
1.23%
1.72%
0.00%
0.00%
0.00%
0.17%
0.15%
0.68%
0.30%
0.00%
0.25%
0.46%
27-Jul-17
24
3.43%
37.32%
36.49%
36.49%
36.49%
36.39%
35.52%
35.31%
34.96%
30.15%
30.08%
29.51%
28.85%
28.31%
27.23%
27.07%
23.22%
21.04%
20.34%
17.78%
14.82%
14.57%
14.57%
14.34%
14.24%
13.91%
13.91%
12.68%
10.96%
10.96%
10.96%
10.96%
10.80%
10.64%
9.96%
9.66%
9.66%
9.41%
20-Jul-17
23
0.27%
0.83%
0.00%
0.00%
0.10%
0.87%
0.21%
0.35%
4.81%
0.07%
0.57%
0.66%
0.54%
1.09%
0.16%
3.85%
2.18%
0.70%
2.56%
2.95%
0.26%
0.00%
0.23%
0.10%
0.32%
0.00%
1.23%
1.72%
0.00%
0.00%
0.00%
0.17%
0.15%
0.68%
0.30%
0.00%
0.25%
0.46%
13-Jul-17
3-Aug-17
6-Jul-17
22
10-Aug-17
29-Jun-17
21
8.92%
22-Jun-17
20
11.51%
15-Jun-17
19
2.59%
8-Jun-17
18
0.11%
1-Jun-17
17
8.95%
25-May-17
16
7.62%
18-May-17
15
1.33%
8.81%
8.81%
6.90%
6.47%
6.32%
4.15%
4.15%
2.41%
2.41%
1.67%
1.67%
14
3.08%
0.00%
1.91%
0.43%
0.15%
2.17%
0.00%
1.75%
0.00%
0.74%
0.00%
1.36%
13
8.95%
4.54%
3.06%
2.98%
2.81%
2.65%
2.65%
1.83%
1.15%
1.08%
0.39%
0.39% 12
7.62%
1.48%
0.08%
0.17%
0.15%
0.00%
0.82%
0.68%
0.08%
0.68%
0.00%
0.00%
11
1.33%
4.54%
3.06%
2.98%
2.81%
2.65%
2.65%
1.83%
1.15%
1.08%
0.39%
0.39%
4-May-17
27-Apr-17
11-May-17
20-Apr-17
10
3.08%
1.48%
0.08%
0.17%
0.15%
0.00%
0.82%
0.68%
0.08%
0.68%
0.00%
0.00%
0.31%
13-Apr-17
9
0.23%
6-Apr-17
8
0.08%
20‐Apr‐17 27‐Apr‐17
30-Mar-17
7
0.00%
6‐Apr‐17 13‐Apr‐17
23-Mar-17
6
0.39%
30‐Mar‐17
16-Mar-17
5
0.32%
16‐Mar‐17 23‐Mar‐17
9-Mar-17
4
0.07%
0.23%
0.23%
0.15%
0.15%
0.00%
0.00%
0.00%
2‐Mar‐17 9‐Mar‐17
2-Mar-17
3
0.30%
0.00%
0.08%
0.00%
0.15%
0.00%
0.00%
0.00%
0.00%
0.00%
2
0.39%
0.02%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1
0.32%
0.02%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
WEEK
0.07%
0.02%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Overall Project
0.30%
0.02%
0.00%
0.00%
0.00%
0.00%
0.00%
Rev. Recovery Cum. Plan
0.00%
Weekly Actual
0.00%
Cum Actual
0.00%
B/L Weekly Plan
0.00%
B/L Cum. Plan
0.00%
0.00%
0.00%
100.00%
B/L Cum. Plan
Cum Actual
70.00%
Rev. Recovery Cum. Plan
Rev. Recovery Cum. Actual
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
Overall Procurement Progress "S" curve
QATAR BRANCH 0.00% 0.00% 0.04% 0.09% 0.47% 0.84% 0.93% 1.00% 1.08% 1.09% 1.60% 1.73%
0.00% 0.00% 0.04% 0.05% 0.38% 0.38% 0.08%
Overall Construction Progress S-Curve
0.07% 0.08% 0.01% 0.50% 0.14%
10.38% 11.14% 11.94% 11.94% 13.46% 14.80% 16.16% 16.90% 18.49% 20.94% 22.08% 22.71% 23.17% 24.05% 24.94% 24.96%
0.64% 0.75% 0.80% 0.00% 1.53% 1.34% 1.36% 0.75% 1.59% 2.45% 1.14% 0.63% 0.45% 0.88% 0.90% 0.02%
"EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 "
33.88% 37.30% 41.59% 45.62% 49.68% 55.99% 63.48% 70.92% 72.75% 74.14% 76.08% 78.68% 81.97% 84.90% 88.01%
2.83% 3.42% 4.28% 4.03% 4.06% 6.31% 7.49% 7.44% 1.82% 1.39% 1.95% 2.59% 3.29% 2.93% 3.11%
DATE:
93.53% 94.42% 95.67% 96.94% 97.78% 98.37% 98.52% 98.85% 99.08% 99.30% 99.39% 99.55% 99.62% 99.84% 99.96% 100.00%
1.77% 0.89% 1.24% 1.27% 0.84% 0.58% 0.15% 0.34% 0.23% 0.22% 0.09% 0.16% 0.07% 0.22% 0.12% 0.04%
91.76%
31.05%
2.70%
1.73%
28.35%
2.39%
90.03%
25.96%
2.02%
24.96% 1.00%
24.94%
24.05%
23.17%
22.71%
22.08%
20.94%
18.49%
16.90%
16.16%
14.80%
13.46%
11.94%
11.94%
11.14%
10.38%
9.75%
9.33%
0.02%
0.90%
0.88%
0.45%
0.63%
1.14%
2.45%
1.59%
0.75%
1.36%
1.34%
1.53%
0.00%
0.80%
0.75%
0.64%
0.42%
0.42%
24.96%
24.94%
24.05%
23.17%
22.71%
22.08%
20.94%
18.49%
16.90%
16.16%
14.80%
13.46%
11.94%
11.94%
11.14%
10.38%
9.75%
9.33%
0.02%
0.90%
0.88%
0.45%
0.63%
1.14%
2.45%
1.59%
0.75%
1.36%
1.34%
1.53%
0.00%
0.80%
0.75%
0.64%
0.42%
0.42%
16-Aug-18 23-Aug-18 30-Aug-18 6-Sep-18 13-Sep-18 20-Sep-18 27-Sep-18 4-Oct-18 11-Oct-18 18-Oct-18 25-Oct-18 1-Nov-18 8-Nov-18 15-Nov-18 22-Nov-18 29-Nov-18 6-Dec-18 13-Dec-18 20-Dec-18 27-Dec-18 3-Jan-19 10-Jan-19 17-Jan-19
78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123
2.20% 1.59% 1.20% 1.69% 1.73% 3.06% 1.93% 2.56% 4.26% 3.86% 3.21% 2.14% 3.85% 2.82% 3.79% 2.81% 1.79% 2.21% 2.67% 2.30% 0.88% 0.55% 0.17% 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
50.47% 51.67% 53.36% 55.09% 58.15% 60.08% 62.64% 66.90% 70.76% 73.97% 76.11% 79.96% 82.78% 86.57% 89.38% 91.17% 93.38% 96.04% 98.34% 99.22% 99.77% 99.94% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.00%
9-Aug-18
77
100.00%
2-Aug-18
76 0.00%
26-Jul-18
75
100.00%
19-Jul-18
74
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
25-Oct-18
Page 65 of 170
4-Jul-19
27-Jun-19
20-Jun-19
13-Jun-19
6-Jun-19
30-May-19
23-May-19
16-May-19
23‐May‐19
4‐Jul‐19
27‐Jun‐19
20‐Jun‐19
13‐Jun‐19
6‐Jun‐19
30‐May‐19
10.00%
16‐May‐19
9‐May‐19
2‐May‐19
25‐Apr‐19
18‐Apr‐19
11‐Apr‐19
4‐Apr‐19
28‐Mar‐19
21‐Mar‐19
14‐Mar‐19
7‐Mar‐19
28‐Feb‐19
21‐Feb‐19
14‐Feb‐19
7‐Feb‐19
31‐Jan‐19
24‐Jan‐19
17‐Jan‐19
10‐Jan‐19
3‐Jan‐19
27‐Dec‐18
20‐Dec‐18
13‐Dec‐18
6‐Dec‐18
29‐Nov‐18
22‐Nov‐18
15‐Nov‐18
8‐Nov‐18
1‐Nov‐18
25‐Oct‐18
18‐Oct‐18
11‐Oct‐18
4‐Oct‐18
27‐Sep‐18
20‐Sep‐18
13‐Sep‐18
6‐Sep‐18
30‐Aug‐18
23‐Aug‐18
16‐Aug‐18
9‐Aug‐18
2‐Aug‐18
26‐Jul‐18
19‐Jul‐18
12‐Jul‐18
5‐Jul‐18
28‐Jun‐18
21‐Jun‐18
14‐Jun‐18
7‐Jun‐18
31‐May‐18
24‐May‐18
17‐May‐18
10‐May‐18
3‐May‐18
26‐Apr‐18
19‐Apr‐18
12‐Apr‐18
5‐Apr‐18
29‐Mar‐18
22‐Mar‐18
15‐Mar‐18
8‐Mar‐18
1‐Mar‐18
22‐Feb‐18
15‐Feb‐18
8‐Feb‐18
1‐Feb‐18
25‐Jan‐18
18‐Jan‐18
11‐Jan‐18
4‐Jan‐18
28‐Dec‐17
21‐Dec‐17
14‐Dec‐17
7‐Dec‐17
30‐Nov‐17
23‐Nov‐17
16‐Nov‐17
9‐Nov‐17
2‐Nov‐17
26‐Oct‐17
19‐Oct‐17
12‐Oct‐17
5‐Oct‐17
28‐Sep‐17
21‐Sep‐17
14‐Sep‐17
7‐Sep‐17
31‐Aug‐17
24‐Aug‐17
17‐Aug‐17
10‐Aug‐17
3‐Aug‐17
27‐Jul‐17
20‐Jul‐17
13‐Jul‐17
6‐Jul‐17
29‐Jun‐17
22‐Jun‐17
15‐Jun‐17
8‐Jun‐17
1‐Jun‐17
25‐May‐17
18‐May‐17
11‐May‐17
4‐May‐17
27‐Apr‐17
20‐Apr‐17
13‐Apr‐17
6‐Apr‐17
30‐Mar‐17
23‐Mar‐17
16‐Mar‐17
9‐Mar‐17
2‐Mar‐17
20.00%
9-May-19
2-May-19
25-Apr-19
18-Apr-19
11-Apr-19
4-Apr-19
28-Mar-19
21-Mar-19
14-Mar-19
7-Mar-19
28-Feb-19
21-Feb-19
14-Feb-19
7-Feb-19
31-Jan-19
24-Jan-19
12-Jul-18
73
1.81%
2.09% 44.87%
72
48.88%
2.56% 42.78%
71
46.68%
28-Jun-18
1.84% 40.22%
5-Jul-18
21-Jun-18
1.6%
7-Jun-18
70
1.33%
14-Jun-18
69
38.37%
31-May-18
68
37.05%
24-May-18
67
1.8%
17-May-18
66
35.5%
1.7%
1.9%
65
0.52%
0.83%
1.33%
0.69%
33.7%
32.0%
26-Apr-18
64
8.91%
8.39%
7.56%
6.22%
0.25%
0.17%
19-Apr-18
63
8.91%
8.39%
7.56%
6.22%
5.53%
5.28%
12-Apr-18
62
0.52%
0.83%
1.33%
0.69%
5.53%
5-Apr-18
61
5.28%
29-Mar-18
60
0.25%
22-Mar-18
59
0.17%
15-Mar-18
58
3-May-18
8-Mar-18
57
10-May-18
1-Mar-18
56 1.2%
22-Feb-18
55
30.1%
15-Feb-18
54
0.20%
8-Feb-18
53
5.10%
1-Feb-18
52
5.10%
25-Jan-18
51
0.20%
18-Jan-18
50 1.2%
1.2%
1.6%
1.03%
1.30%
1.53%
1.47%
0.95%
1.44%
2.26%
1.47%
0.91%
1.19%
1.38%
1.81%
1.53%
49
28.9%
27.7%
26.4%
24.86%
23.84%
22.54%
21.01%
19.54%
18.59%
17.14%
14.88%
13.41%
12.50%
11.30%
9.92%
8.11%
4-Jan-18 11-Jan-18
48
0.12%
0.21%
0.18%
0.85%
0.28%
0.56%
0.57%
0.15%
0.14%
0.07%
0.04%
0.14%
0.50%
0.01%
0.08%
0.07%
0.93%
0.74%
28-Dec-17
47
4.91%
4.78%
4.57%
4.40%
3.55%
3.28%
2.72%
2.14%
1.99%
1.85%
1.78%
1.73%
1.60%
1.09%
1.08%
1.00%
6.58%
5.65%
21-Dec-17
46
4.91%
4.78%
4.57%
4.40%
3.55%
3.28%
2.72%
2.14%
1.99%
1.85%
1.78%
1.73%
1.60%
1.09%
1.08%
1.00%
0.08%
0.38%
0.37%
0.21%
7-Dec-17
30-Nov-17
14-Dec-17
23-Nov-17
45
0.12%
0.21%
0.18%
0.85%
0.28%
0.56%
0.57%
0.15%
0.14%
0.07%
0.04%
0.14%
0.50%
0.01%
0.08%
0.07%
0.93%
0.84%
4.91%
4.53%
0.21%
0.81%
16-Nov-17
44
0.93%
0.38%
0.05%
4.32%
4.11%
0.51%
0.28%
9-Nov-17
43
0.84%
0.47%
0.09%
0.04%
0.00%
3.30%
2.79%
0.30%
2-Nov-17
42
0.08%
0.47%
0.09%
0.04%
0.00%
0.00%
0.00%
2.51%
0.26%
0.21%
26-Oct-17
41
0.38%
0.38%
0.05%
0.04%
0.00%
0.00%
0.00%
0.00%
2.21%
1.95%
19-Oct-17
40
0.04%
0.00%
0.00%
0.00%
0.00%
0.00%
0.67%
0.48%
39
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.74%
1.07%
5-Oct-17 12-Oct-17
38
9.75%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.20%
0.18%
28-Sep-17
37
9.33%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.59%
0.39%
21-Sep-17
36
0.42%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.17%
0.05%
14-Sep-17
35
0.42%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.22%
0.05%
7-Sep-17
34
8.91%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
31-Aug-17
33
0.52%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
24-Aug-17
32
8.39%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
17-Aug-17
31
7.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
10-Aug-17
30
0.83%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3-Aug-17
29
1.33%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
27-Jul-17
28
6.22%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
20-Jul-17
27
0.69%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26
5.53%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6-Jul-17 13-Jul-17
25
5.28%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
29-Jun-17
24
0.25%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
22-Jun-17
23
0.17%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
15-Jun-17
22
5.10%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8-Jun-17
21
0.20%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1-Jun-17
20
4.91%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
19
4.78%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
25-May-17
18
0.12%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
18-May-17
17
0.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4-May-17 11-May-17
16
4.57%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
15
0.18%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
27-Apr-17
14
4.40%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00% 20-Apr-17
13
0.85%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6-Apr-17 13-Apr-17
12
3.55%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
30-Mar-17
11
0.28%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
23-Mar-17
10
3.28%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
9
2.72%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
9-Mar-17 16-Mar-17
8
0.56%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2-Mar-17
7
0.57%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6
2.14%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5
0.15%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4
1.99%
0.00%
0.00%
0.00%
0.00% 3
0.14%
0.00%
0.00%
Rev. Recovery Weekly Plan
0.00%
Rev. Recovery Cum. Plan
2
1.78%
0.00%
0.00%
Cum Actual
0.00% 1
0.00%
B/L Cum. Plan
0.00%
WEEK
0.00%
Weekly Actual
0.00%
B/L Weekly Plan
1.849%
0.00%
Overall Project
0.07%
0.00%
Rev. Recovery Weekly Actual
0.00%
0.00%
0.04%
Rev. Recovery Cum. Actual
0.00%
100.00%
90.00%
Overall Construction Progress "S" curve
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
B/L Cum. Plan
Cum Actual
Rev. Recovery Cum. Plan
Rev. Recovery Cum. Actual
Revised Weekly Actual Revised Weekly Plan
Revised Cumulative Actual
QATAR BRANCH 7.00%
6.35%
0.21% 0.04% 30.87%
0.30% 0.09% 37.22%
0.21%
1-Nov-18
8-Nov-18
15-Nov-18
22-Nov-18
29-Nov-18
W-89 W-90 W-91 W-92
0.00% 0.00% 55.66% #####
Pre-Commisioning & Commissioning Progress S-Curve "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS PROJECT No. 3963 "
44.04%
46.78%
52.04%
56.36%
57.67%
59.44%
64.54%
71.98%
0.88% 2.74% 5.26% 4.33% 1.31% 1.76% 5.10% 7.44%
100.00%
43.16%
0.00%
#####
43.16%
0.13%
89.68%
43.03%
0.00%
5.66%
43.03%
0.00%
84.03%
43.03%
0.00%
#####
43.03%
7.95%
Doha, Qatar
Page 66 of 170
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
100.00% 0.00%
23-May-19
16-May-19
9-May-19
2-May-19
25-Apr-19
18-Apr-19
11-Apr-19
4-Apr-19
28-Mar-19
21-Mar-19
14-Mar-19
7-Mar-19
28-Feb-19
21-Feb-19
14-Feb-19
7-Feb-19
31-Jan-19
24-Jan-19
17-Jan-19
W-98 100.00% 0.00%
W-97
35.08%
9.89%
W-96
#####
19.41%
8.11%
10-Jan-19 9.52%
1.11%
W-95 100.00% 0.00%
1.40%
0.00%
3-Jan-19
0.30%
0.00%
W-94 100.00% 0.00%
100.00% 3.95% 0.30%
27-Dec-18
8.80%
96.05% 0.30%
W-93 100.00% 0.00%
6.24%
87.25%
20-Dec-18
7.55%
81.01%
13-Dec-18
8.70%
73.46%
6-Dec-18
9.10%
0.00% -0.30% 44.24%
W-88 7.03%
6.68%
25-Oct-18
0.17% 0.00%
W-87
64.76%
0.00%
0.30%
0.30%
0.30% 0.09%
0.09%
18-Oct-18
6.53%
0.17% 0.00% 23.87%
0.17%
0.00%
0.21% 0.04%
0.04%
11-Oct-18
0.17% 0.00% 17.34% #####
0.17%
0.17%
0.30%
0.17% 0.00%
0.00%
4-Oct-18
W-86
0.00%
0.17% 0.00%
0.00%
W-85
3.15%
W-84
4.45%
W-83
0.17% 0.00%
W-82
0.17%
27-Sep-18
13-Sep-18
W-81
2.23%
1.10%
6-Sep-18
W-80
0.30%
0.17% 0.00%
0.00%
1.30%
0.00%
30-Aug-18
W-79 20-Sep-18
0.17% 0.17%
0.19%
0.14%
23-Aug-18
W-78
0.00%
0.17% 0.00%
0.00%
0.17%
0.00% 0.00%
0.19%
0.05%
16-Aug-18
W-77
0.30%
0.17% 0.17%
0.17%
0.00%
0.00% 0.00%
0.05%
0.00%
9-Aug-18
W-76
0.00%
0.00% 0.00%
0.00%
0.00%
0.00% 0.00%
0.00%
0.00%
W-75
0.30%
0.00% 0.00%
0.00%
0.00%
0.00% 0.00%
0.00%
2-Aug-18
Week
0.00%
0.00% 0.00%
0.00%
0.00%
0.00% 0.00%
Overall Construction
0.30%
0.00% 0.00%
0.00%
0.00%
0.00%
23‐May‐19
16‐May‐19
9‐May‐19
2‐May‐19
25‐Apr‐19
18‐Apr‐19
11‐Apr‐19
4‐Apr‐19
28‐Mar‐19
21‐Mar‐19
14‐Mar‐19
7‐Mar‐19
28‐Feb‐19
21‐Feb‐19
14‐Feb‐19
7‐Feb‐19
31‐Jan‐19
24‐Jan‐19
17‐Jan‐19
10‐Jan‐19
3‐Jan‐19
27‐Dec‐18
20‐Dec‐18
13‐Dec‐18
6‐Dec‐18
29‐Nov‐18
22‐Nov‐18
15‐Nov‐18
8‐Nov‐18
1‐Nov‐18
25‐Oct‐18
18‐Oct‐18
11‐Oct‐18
4‐Oct‐18
27‐Sep‐18
20‐Sep‐18
13‐Sep‐18
6‐Sep‐18
30‐Aug‐18
23‐Aug‐18
16‐Aug‐18
B/L Cum. Plan
0.00%
0.00% 0.00%
Revised Cumulative Plan
0.00%
9‐Aug‐18
80.00%
0.00%
Cum Actual
0.00% 0.00%
Weekly Actual
0.00%
B/L Cum. Plan
0.00% 0.00%
B/L Weekly Plan
0.00%
0.00% 2‐Aug‐18
100.00%
90.00%
Pre‐Commisioning & Commisioning Progress "S" Curve
Cum Actual
Revised Cumulative Plan
70.00%
Revised Cumulative Actual
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
W-99 W-100 W-101 W-102 W-103 W-104 W-105 W-106 W-107 W-108 W-109 W-110 W-111 W-112 W-113 W-114 W-115 W-116 W-117
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
DATE: 25-Oct-18
QATAR BRANCH 0.00%
0.00%
0.00%
0.00%
Overall Project Close-Out S-Curve EPIC OF REPLACMENT OF THREE PHASE TEST DATE: SEPARATORS IN ALL DEGASSING STATIONS
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Cum Act 0.00%
0.00%
0.00%
0.00%
11.29%
11.29%
11.29%
33.87%
45.16%
56.45%
11.29%
9.68%
0.00%
0.00%
90.32%
100.00%
100.00%
100.00%
11.29%
11.29%
22.58%
79.03%
11.29%
11.29%
11.29%
0.00%
0.00%
67.74%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Cum. Plan
0.00%
0.00%
Week Plan
0.00%
Week Act
0.00%
Overall Project C 22-Jan-19
29-Jan-19
5-Feb-19
12-Feb-19
19-Feb-19
26-Feb-19
5-Mar-19
12-Mar-19
19-Mar-19
26-Mar-19
2-Apr-19
9-Apr-19
16-Apr-19
23-Apr-19
30-Apr-19
7-May-19
14-May-19
21-May-19
28-May-19
4-Jun-19
11-Jun-19
18-Jun-19
25-Jun-19
2-Jul-19
9-Jul-19
16-Jul-19
23-Jul-19
30-Jul-19
6-Aug-19
100.00%
Close‐Out "S"Curve 100.00%
90.00% 90.00%
80.00%
70.00% 80.00%
60.00% Week Act 70.00%
50.00%
40.00%
20.00% 60.00%
Cum. Plan 50.00%
30.00% 40.00%
Cum Act 30.00%
10.00% 20.00%
10.00%
0.00% 0.00%
Week 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
25-Oct-18
Doha, Qatar
Page 67 of 170
PROJECT PLANNING PACKAGE
Attachment 6
MANPOWER HISTOGRAM
Page 68 of 170
Sr.No.
A
DESCRIPTION
PEAK QTY
MAN MONTH
Project Timeline (Monthwise) Nov-18
Dec-18
Jan-19
1
CIVIL TEAM
40
95
40
35
20
2
INSTRUMENT TEAM
40
82
12
40
30
3
ELECTRICAL TEAM
24
48
4
PIPING TEAM
24
60
B
Feb-19
Mar-19
12
Apr-19
May-19
JELAHA STATION
-
24
24
12
24
24
20
CIVIL TEAM
30
107
30
25
20
2
INSTRUMENT TEAM
24
96
24
24
24
12
12
3
ELECTRICAL TEAM
16
66
14
16
16
10
10
PIPING TEAM
20
66
14
20
20
12
17
15
12
10
8
14
20
20
20
20
4
FAHAHIL SOUTH
-
CIVIL TEAM
22
102
2
INSTRUMENT TEAM
20
94
3
ELECTRICAL TEAM
12
56
4
PIPING TEAM
12
70
FAHAHIL NORTH
-
Sep-19
18
22
12
12
12
10
10
10
12
12
12
12
12
25
22
20
10
10
12
16
16
16
12
12
12
12
10
12
12
12
12
12
22
20
20
15
15
20
20
20
12
-
1
CIVIL TEAM
25
109
2
INSTRUMENT TEAM
16
72
3
ELECTRICAL TEAM
12
64
4
PIPING TEAM
12
60
E
FAHAHIL MAIN
-
22
6
12
-
1
CIVIL TEAM
22
130
2
INSTRUMENT TEAM
20
72
3
ELECTRICAL TEAM
12
64
6
12
12
12
12
10
4
PIPING TEAM
20
88
8
8
20
20
20
12
332
1,601 -
TOTAL
00 REV NO
Aug-19
-
1
D
Jul-19
-
1
C
Jun-19
ALL KHATIYA STATIONS
ISSUED FOR APPROVAL DETAIL
1-Nov-18 DATE
16
140
22
290
332
271
232
203
133
-
-
-
-
-
REPLACEMENT THREE PHASE TEST SEPARATOR
VS BY
Page 69 of 170
Sr.No.
1
DESCRIPTION
PEAK QTY
CONTRACT REPRESENTATIVE
MAN MONTHS 1
9
Project Timeline (Monthwise) Nov-18
Dec-18 1
1
Jan-19
Feb-19
Mar-19
Apr-19
May-19
Jun-19
Jul-19
1
1
1
1
1
1
1
2
DPEPUTY PROJECT MANAGER
1
9
1
1
1
1
1
1
1
1
1
2
CONSTRUCTION MANAGER
1
9
1
1
1
1
1
1
1
1
1
3
QA/QC MANAGER
1
9
1
1
1
1
1
1
1
1
1
4
HSE MANAGER
1
9
1
1
1
1
1
1
1
1
1
5
COMMISSIONG MANANGER
1
9
1
1
1
1
1
1
1
1
1
6
SR. PLANNING/COORDINATOR
1
9
1
1
1
1
1
1
1
1
1
7
SR. PLANNING ENGINEER
1
9
1
1
1
1
1
1
1
1
1
8
SITE PLANNING ENGINEER
1
9
1
1
1
1
1
1
1
1
1
1
9
LEAD HSE OFFICER
10
HSE OFFICERS
11
MECHANICAL ENGINEER
1
9
1
1
14
104
12
14
1
9
1
1
1 14
1
1 14
1
1 14
1
1 14
1
1 10
1
1
6
INSTRUMENT ENGINEER
1
9
1
1
1
1
1
1
1
1
1
ELETRICAL ENGINEER
1
9
1
1
1
1
1
1
1
1
1 1
14
QA/QC ENGINEER
1
9
1
1
1
1
1
1
1
1
15
QA /QC INSPECTOR
6
54
6
6
6
6
6
6
6
6
6
16
CIVIL ENGINEER
1
9
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
6
6
6
6
6
6
6
6
6
1
COMMISSIONG ENGINEER
1
6
ADMIN TEAM
6
54
19
PRO OFFICCER
1
9
1
1
20
PTW - COORDINATOR
1
9
1
1
1
1
1
1
1
21
SITE SUPERVISORS - PTW
20
164
20
20
20
20
20
20
20
61
64
64
63
63
64
60
TOTAL
64
-
ISSUED FOR APPROVAL DETAIL
1-Nov-18 DATE
1
1
1
1
1 1
12
1 12
535
-
00 REV NO
1
Oct-19
1
12
17
Sep-19
1 6
13
18
Aug-19
VS BY
TITLE:
48
48
-
-
-
-
DIRECT MANPOWER DEPLOYMENT SCHEDULE CIVIL, MECHANICAL AND E&I WORKS FOR REPLACEMENT THREE PHASE TEST SEPARATOR AT DUKHAN, QATAR
Page 70 of 170
PROJECT PLANNING PACKAGE
Attachment 7
ENGINEERING DOCUMENT DELIVERABLE REGISTER
Page 71 of 170
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
SRN
SEQ
1
1
DISCIPLINE GENERAL
DOC NO
DOC NO 3963‐DGEN‐0‐00‐0002
ITEM CODE
DOC DESC
ITEM CODE OT
DOC CLASS
CURRENT REVISION
SHUTD OWN PACKA GE SHUTD OWN
Original BL WV
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100% ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
DOC CLASS
CURRENT REVISION
WV
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
ACTS
ACTD
ACTIFC
ACTIFA
ACTIAWH
ACTIAFC
ENGINEERING DOCUMENT & DELIVERABLES REGISTER (EDDR)
1
A
0.417%
14‐Mar‐17
24‐Mar‐17
29‐Mar‐17
14‐May‐17
4‐Jun‐17
14‐Jun‐17
31‐Oct‐18
12‐Mar‐17
20‐Mar‐17
29‐Mar‐17
3‐Aug‐17
3‐Aug‐17
3‐Aug‐17
22‐Jul‐19
12‐Mar‐17
20‐Mar‐17
29‐Mar‐17
3‐Aug‐17
3‐Aug‐17
3‐Aug‐17
95%
95%
0%
0.396%
0.396%
DOC DESC
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS
Plan WF
Actual WF
2
1
GENERAL
3963‐DGEN‐0‐29‐0001
OT
DESIGN BASIS MEMORANDUM
1
A
0.222%
15‐Mar‐17
25‐Mar‐17
30‐Mar‐17
30‐Apr‐17
21‐May‐17
31‐May‐17
31‐Oct‐18
15‐Mar‐17
29‐Mar‐17
29‐Mar‐17
29‐Jun‐17
26‐Jul‐17
7‐Dec‐17
22‐Jul‐19
15‐Mar‐17
29‐Mar‐17
29‐Mar‐17
29‐Jun‐17
26‐Jul‐17
7‐Dec‐17
95%
95%
0%
0.211%
0.211%
3
1
GENERAL
3963‐DGEN‐0‐04‐0003
OT
ENGINEERING EXECUTION PLAN
1
A
0.278%
15‐Mar‐17
25‐Mar‐17
30‐Mar‐17
30‐Apr‐17
21‐May‐17
31‐May‐17
31‐Oct‐18
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
10‐May‐17
10‐May‐17
10‐May‐17
22‐Jul‐19
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
10‐May‐17
10‐May‐17
10‐May‐17
95%
95%
0%
0.264%
0.264%
21‐May‐17
31‐May‐17
31‐Oct‐18
15‐Mar‐17
17‐Mar‐17
29‐Mar‐17
25‐May‐17
21‐Jun‐17
22‐Jul‐19
15‐Mar‐17
17‐Mar‐17
29‐Mar‐17
25‐May‐17
SITE VISIT (1) ‐ REPORT
1
A
0.972%
15‐Mar‐17
25‐Mar‐17
30‐Mar‐17
30‐Apr‐17
5
1
GENERAL
3963‐DGEN‐0‐17‐0002
OT
SITE VISIT (2) ‐ REPORT
1
A
0.417%
29‐Apr‐17
1‐May‐17
4‐May‐17
25‐May‐17
15‐Jun‐17
25‐Jun‐17
31‐Oct‐18
2‐May‐17
4‐May‐17
4‐May‐17
1‐Jun‐17
17‐Jul‐17
18‐Jul‐17
22‐Jul‐19
2‐May‐17
4‐May‐17
4‐May‐17
1‐Jun‐17
17‐Jul‐17
18‐Jul‐17
95%
95%
0%
0.396%
0.396%
6
4
1
GENERAL
3963‐DGEN‐0‐17‐0003
OT
SITE VISIT‐3 REPORT BY SYSTEM OEM (YOKOGAWA) FOR KAHM / KAHN / KAHS / JALM
1
A
0.056%
30‐Jul‐17
7‐Aug‐17
10‐Aug‐17
31‐Aug‐17
14‐Sep‐17
21‐Sep‐17
31‐Oct‐18
22‐Sep‐17
23‐Sep‐17
25‐Sep‐17
19‐Oct‐17
19‐Oct‐17
14‐Dec‐17
22‐Jul‐19
22‐Sep‐17
23‐Sep‐17
25‐Sep‐17
19‐Oct‐17
19‐Oct‐17
14‐Dec‐17
95%
95%
0%
0.053%
0.053%
3963‐DGEN‐0‐17‐0004
OT
SITE VISIT‐4 REPORT BY SYSTEM OEM (EMERSON) FOR FAHM / FAHN / FAHS
1
A
0.042%
30‐Jul‐17
7‐Aug‐17
10‐Aug‐17
14‐Sep‐17
21‐Sep‐17
31‐Oct‐18
27‐Jul‐17
30‐Jul‐17
31‐Jul‐17
5‐Oct‐17
8‐Oct‐17
8‐Oct‐17
22‐Jul‐19
27‐Jul‐17
30‐Jul‐17
31‐Jul‐17
5‐Oct‐17
8‐Oct‐17
8‐Oct‐17
0.042%
16‐Aug‐17
16‐Aug‐17
16‐Aug‐17
23‐Aug‐17
23‐Aug‐17
30‐Aug‐17
31‐Oct‐18
12‐Jan‐18
15‐Jan‐18
18‐Jan‐18
21‐Jan‐18
26‐Jan‐18
27‐Jan‐18
22‐Jul‐19
12‐Jan‐18
15‐Jan‐18
18‐Jan‐18
21‐Jan‐18
26‐Jan‐18
27‐Jan‐18
95%
95%
0%
0.040%
0.040%
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
10‐Jun‐17
4‐Dec‐17
7
1
1
GENERAL
GENERAL
3963‐DGEN‐0‐17‐0001
OT
8
7
GENERAL
3963‐DGEN‐0‐00‐0001
OT
MISCELLANEOUS ‐ GENERAL
0
9
7
PROCESS
3963‐FAHM‐6‐52‐0001
OT
DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION GENERAL , PROCESS FLOW DIAGRAM
1
10
OT
31‐Aug‐17
10‐May‐17
31‐May‐17
21‐Jun‐17
21‐Jun‐17
21‐Jun‐17
95%
95%
95%
95%
0%
0%
0.924%
0.040%
0.924%
0.040%
7
PROCESS
3963‐FAHM‐6‐52‐0002
PFD FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ FIRST STAGE SEPARATOR & PWT
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
31‐Oct‐18
5‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
5‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
95%
95%
0%
0.053%
0.053%
11
7
PROCESS
3963‐FAHM‐6‐52‐0003
OT
PFD FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ SEPARATORS SYSTEM
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
12
7
PROCESS
3963‐FAHN‐6‐52‐0001
OT
PFD FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ FIRST STAGE SEPARATOR & PWI
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
14‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
14‐Dec‐17
95%
95%
0%
0.053%
0.053%
13
7
PROCESS
3963‐FAHS‐6‐52‐0001
OT
PFD FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ FIRST STAGE SEPARATOR & PWT
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
14
7
PROCESS
3963‐JALM‐6‐52‐0001
OT
DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ GENERAL, PROCESS FLOW DIAGRAM
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
3963‐JALM‐6‐52‐0002
OT
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
6‐Apr‐17
9‐Apr‐17
95%
95%
0%
0.053%
0.053%
15
7
PROCESS
PFD FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ JALEHA/DIYAB PROD. & FLOW LINES
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
16
7
PROCESS
3963‐JALM‐6‐52‐0003
OT
PFD FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ FIRST STAGE SEPARATORS & PWT
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
17
7
PROCESS
3963‐JALM‐6‐52‐0004
OT
PFD FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ SEPARATION TRAIN
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
18
7
PROCESS
3963‐KAHM‐6‐52‐0001
OT
DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ GENERAL, PROCESS FLOW DIAGRAM
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
19
PROCESS
3963‐KAHM‐6‐52‐0002
OT
PFD FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ FIRST STAGE SEPARATORS
1
A
0.056%
25‐Mar‐17
20
7
PROCESS
3963‐KAHM‐6‐52‐0003
OT
PFD FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ PRODUCED WATER TREATMENT
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
21
7
PROCESS
3963‐KAHN‐6‐52‐0001
OT
DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ GENERAL PROCESS FLOW DIAGRAM
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
22
7
OT
DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ GENERAL PROCESS FLOW DIAGRAM
1
A
0.056%
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
7
PROCESS
3963‐KAHS‐6‐52‐0002
OT
DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ GENERAL PROCESS FLOW DIAGRAM
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
7
PROCESS
3963‐FAHM‐6‐52‐0004
OT
PFD FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION 3 PHASE TEST SEPERATOR, SEPARATOR SYSTEM
1
A
0.069%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.066%
0.066%
3963‐DGEN‐6‐17‐0001
OT
PROCESS SIMULATION & H&MB REPORT
1
A
0.111%
1‐Apr‐17
11‐Apr‐17
16‐Apr‐17
17‐May‐17
7‐Jun‐17
17‐Jun‐17
31‐Oct‐18
10‐Apr‐17
11‐Apr‐17
12‐Apr‐17
21‐Jun‐17
13‐Jul‐17
18‐Jul‐17
10‐Apr‐17
11‐Apr‐17
12‐Apr‐17
21‐Jun‐17
13‐Jul‐17
18‐Jul‐17
95%
95%
0%
0.106%
0.106%
26
7
PROCESS
3963‐DGEN‐6‐12‐0001
OT
3 ‐ PHASE TEST SEPARATOR SIZING CALCULATION
1
B
0.097%
12‐Apr‐17
22‐Apr‐17
27‐Apr‐17
28‐May‐17
18‐Jun‐17
28‐Jun‐17
31‐Oct‐18
18‐Apr‐17
12‐Jun‐17
13‐Jun‐17
27‐Aug‐17
19‐Sep‐17
20‐Sep‐17
22‐Jul‐19
18‐Apr‐17
12‐Jun‐17
13‐Jun‐17
27‐Aug‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.092%
0.092%
27
7
PROCESS
3963‐DGEN‐6‐00‐0001
OT
PROJECT DRAWING INDEX (PROCESS)
1
1
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
4‐Jun‐17
4‐Jun‐17
2‐Oct‐17
2‐Oct‐17
2‐Oct‐17
22‐Jul‐19
18‐Apr‐17
4‐Jun‐17
4‐Jun‐17
2‐Oct‐17
2‐Oct‐17
2‐Oct‐17
95%
95%
0%
0.053%
0.053%
3963‐DGEN‐6‐50‐0001
OT
28
7
PROCESS
3963‐KAHS‐6‐52‐0001
10‐May‐17
23
7
PROCESS
9‐Apr‐17
24 25
7
4‐Apr‐17
0.053%
PROCESS
22‐Jul‐19
LEGEND, SYMBOLS & ABBREVIATIONS (2 SHEETS)
1
B
0.097%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
4‐May‐17
4‐May‐17
19‐Jun‐17
21‐Aug‐17
21‐Aug‐17
22‐Jul‐19
18‐Apr‐17
4‐May‐17
4‐May‐17
19‐Jun‐17
21‐Aug‐17
21‐Aug‐17
95%
95%
0%
0.092%
0.092%
29
7
PROCESS
3963‐KAHM‐6‐50‐0001
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
3‐Jan‐18
22‐Jul‐19
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
3‐Jan‐18
95%
95%
0%
0.053%
0.053%
30
7
PROCESS
3963‐KAHM‐6‐50‐0002
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 24‐V‐XXX1
1
A
0.083%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
3‐Jan‐18
22‐Jul‐19
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
3‐Jan‐18
95%
95%
0%
0.079%
0.079%
31
7
PROCESS
3963‐KAHM‐6‐50‐0003
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐NEW 3 PHASE TEST SEPARATOR 24‐V‐XXX1
1
A
0.083%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
21‐Jan‐18
22‐Jul‐19
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
21‐Jan‐18
95%
95%
0%
0.079%
32
7
PROCESS
3963‐KAHM‐6‐50‐0005
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ DEGASSING VESSEL 24‐V‐4005
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
15‐Jun‐17
3‐Jan‐18
22‐Jul‐19
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
15‐Jun‐17
3‐Jan‐18
95%
95%
0%
0.053%
0.053%
33
7
PROCESS
3963‐KAHM‐6‐50‐0006
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ GAS GATHERING STATION
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
3‐Jan‐18
22‐Jul‐19
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
3‐Jan‐18
95%
95%
0%
0.053%
0.053%
34
7
PROCESS
3963‐KAHM‐6‐50‐0007
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ CRUDE OIL FROM KHATIYAH NORTH
1
B
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
3‐May‐17
15‐Jun‐17
11‐Sep‐17
12‐Sep‐17
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
3‐May‐17
15‐Jun‐17
11‐Sep‐17
12‐Sep‐17
35
7
PROCESS
3963‐KAHM‐6‐50‐0008
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ CRUDE OIL FROM KHATIYAH SOUTH
1
B
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
18‐May‐17
15‐Jun‐17
11‐Sep‐17
12‐Sep‐17
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
18‐May‐17
15‐Jun‐17
11‐Sep‐17
12‐Sep‐17
95%
95%
0%
0.053%
0.053%
36
7
PROCESS
3963‐KAHM‐6‐51‐0001
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ DRAIN COLLECTION
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
3‐May‐17
15‐Jun‐17
15‐Jun‐17
5‐Oct‐17
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
3‐May‐17
15‐Jun‐17
15‐Jun‐17
5‐Oct‐17
95%
95%
0%
0.053%
0.053%
37
7
PROCESS
3963‐KAHM‐6‐51‐0002
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐PROCESS FLARE COLLECTION
1
B
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
15‐Jun‐17
5‐Oct‐17
22‐Jul‐19
18‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
15‐Jun‐17
5‐Oct‐17
95%
95%
0%
0.053%
0.053%
PROCESS
3963‐KAHM‐6‐51‐0003
OT
15‐Jun‐17
22‐Jul‐19
18‐Apr‐17
30‐Apr‐17
3‐May‐17
38
7
B
3‐Jul‐17
95%
95%
0%
0.053%
0.079%
0.053%
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION
1
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
5‐Oct‐17
15‐Jun‐17
15‐Jun‐17
5‐Oct‐17
95%
95%
0%
0.053%
0.053%
39
7
PROCESS
3963‐KAHN‐6‐50‐0001
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 22‐V‐XXX1
1
A
0.083%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
30‐Apr‐17
3‐May‐17
9‐Jul‐17
26‐Sep‐17
21‐Jan‐18
22‐Jul‐19
18‐Apr‐17
30‐Apr‐17
3‐May‐17
9‐Jul‐17
26‐Sep‐17
21‐Jan‐18
95%
95%
0%
0.079%
0.079%
40
7
PROCESS
3963‐KAHN‐6‐50‐0003
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR CONT. SKID 22‐V‐
1
A
0.083%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
26‐Sep‐17
2‐Jan‐18
22‐Jul‐19
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
26‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
41
7
PROCESS
3963‐KAHN‐6‐50‐0004
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PROD WATER DEGASSING VESSEL 22‐V‐7490
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
22‐Jul‐19
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
95%
95%
0%
0.053%
42
7
PROCESS
3963‐KAHN‐6‐50‐0005
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PROD WATER DEGASSING VESSEL 22‐V‐7495
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
22‐Jul‐19
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
43
7
PROCESS
3963‐KAHN‐6‐50‐0006
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ WET LIFT GAS KO DRUM 22‐V‐4601
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
22‐Jul‐19
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
44
7
PROCESS
3963‐KAHN‐6‐50‐0007
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PIG LAUNCHER 22‐Z‐7020
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
26‐Sep‐17
2‐Jan‐18
22‐Jul‐19
18‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
26‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
45
7
PROCESS
3963‐KAHN‐6‐50‐0008
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEP. CONT. SKID 22‐V‐4002
1
A
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
46
7
PROCESS
3963‐KAHN‐6‐50‐0009
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ FIRST STAGE 3 PHASE SEP. 22‐V‐7480
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
3‐May‐17
22‐Jun‐17
26‐Sep‐17
2‐Jan‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
3‐May‐17
22‐Jun‐17
26‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
47
7
PROCESS
3963‐KAHN‐6‐50‐0010
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES
1
B
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
26‐Sep‐17
2‐Jan‐18
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
26‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
48
7
PROCESS
3963‐KAHN‐6‐51‐0001
OT
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION
1
A
0.056%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.053%
0.053%
49
7
PROCESS
3963‐KAHN‐6‐52‐0002
OT
DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ SEPARATORS SYSTEM PROCESS FLOW DIAGRAM
1
A
0.056%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
20‐Jul‐17
10‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.053%
0.053%
50
7
PROCESS
DEM‐3963‐KAHM‐6‐50‐0001
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES ,P&ID (DEMO
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
2‐Jan‐18
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
2‐Jan‐18
95%
95%
0%
0.040%
0.040%
51
7
PROCESS
DEM‐3963‐KAHM‐6‐50‐0002
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 24‐V‐7900,P&ID (D
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
2‐Jan‐18
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
2‐Jan‐18
95%
95%
0%
0.040%
0.040%
52
7
PROCESS
DEM‐3963‐KAHM‐6‐50‐0003
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 24‐V7900 CTRL SKI
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
2‐Jan‐18
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
2‐Jan‐18
95%
95%
0%
0.040%
0.040%
53
7
PROCESS
DEM‐3963‐KAHM‐6‐50‐0004
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ DEGASSING VESSEL 24‐V‐4005,P&ID (DEMOLI
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
15‐Jun‐17
2‐Jan‐18
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
15‐Jun‐17
2‐Jan‐18
95%
95%
0%
0.040%
0.040%
54
7
PROCESS
DEM‐3963‐KAHM‐6‐51‐0003
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ IA DISTRIBUTION P&ID (DEMOLITION)
1
B
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
24‐Sep‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
24‐Sep‐17
95%
95%
0%
0.040%
0.040%
55
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0001
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 22‐V‐7400 (DEMO
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
24‐Aug‐17
4‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
24‐Aug‐17
4‐Oct‐17
95%
95%
0%
0.040%
0.040%
56
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0002
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR CONT. SKID 22‐V‐
1
B
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.040%
57
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0003
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐3 PHASE TEST SEPARATOR CONT. SKID 22‐V‐7
1
B
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
58
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0004
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PROD WATER DEGASSING VESSEL 22‐V‐7490
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
95%
95%
0%
0.040%
0.040%
59
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0005
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PROD WATER DEGASSING VESSEL 22‐V‐7495
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
95%
95%
0%
0.040%
0.040%
60
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0006
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ WET LIFT GAS KO DRUM 22‐V‐4601 (DEMOL
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
61
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0007
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ PIG LAUNCHER 22‐Z‐7020 (DEMOLITION)
1
B
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.040%
62
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0008
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEP. CONT SKID 22‐V‐4002 (D
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
63
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0009
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ FIRST STAGE PHASE SEP. 22‐V‐7480 (DEMOL
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
64
7
PROCESS
DEM‐3963‐KAHN‐6‐50‐0010
DEM
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES (DEMOLITIO
1
B
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
22‐Jul‐19
19‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
PROCESS
DEM‐3963‐KAHN‐6‐51‐0001
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION (DEMOLITI
17‐Apr‐17
27‐Apr‐17
3‐May‐17
22‐Jun‐17
3‐May‐17
65
27‐Apr‐17
22‐Jun‐17
26‐Sep‐17
0.040%
0.040%
1
A
0.042%
22‐Jun‐17
19‐Oct‐17
22‐Jun‐17
22‐Jun‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 14‐V‐XXX1
1
A
0.083%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
21‐Jan‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.079%
0.079%
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
2‐Jan‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
14‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
14‐Jan‐18
95%
95%
0%
0.053%
0.053%
69
7
PROCESS
3963‐FAHM‐6‐50‐0005
OT
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ 3RD STAGE SUCTION KO DRUM 14‐V‐5205,
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
14‐Jan‐18
22‐Jul‐19
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
14‐Jan‐18
95%
95%
0%
0.053%
0.053%
70
7
PROCESS
3963‐FAHM‐6‐50‐0006
OT
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ 3‐PHASE SEPARATOR 14‐V‐4001
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
14‐Jan‐18
22‐Jul‐19
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
14‐Jan‐18
95%
95%
0%
0.053%
0.053%
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ S.D.V & R.V. STATION & DIST. MANIFOLD
1
A
71
3963‐FAHM‐6‐50‐0007
OT
27‐Apr‐17
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
18‐May‐17
2‐Jul‐17
5‐Oct‐17
14‐Jan‐18
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
14‐Jan‐18
7
PROCESS
3963‐FAHM‐6‐51‐0001
OT
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ DRAIN COLLECTION
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
2‐Jan‐18
22‐Jul‐19
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
PROCESS
3963‐FAHM‐6‐51‐0002
OT
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ TANK FLARE COLLECTION
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
2‐Jan‐18
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
PROCESS
3963‐FAHM‐6‐51‐0003
27‐Apr‐17
14‐May‐17
27‐Apr‐17
14‐May‐17
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION
1
A
0.056%
23‐Apr‐17
2‐Jul‐17
2‐Jan‐18
18‐May‐17
2‐Jul‐17
2‐Jul‐17
2‐Jan‐18
PROCESS
3963‐KAHS‐6‐50‐0001
OT
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 23‐V‐XXX1
1
A
0.083%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
21‐Jan‐18
22‐Jul‐19
4‐May‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.079%
0.079%
3963‐KAHS‐6‐50‐0003
OT
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ 3 PHASE SEPARATION HEADERS
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
3‐Jan‐18
22‐Jul‐19
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
3‐Jan‐18
95%
95%
0%
0.053%
0.053%
77
7
PROCESS
3963‐KAHS‐6‐50‐0004
OT
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ DEGASSING VESSEL 23‐V‐7280
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
3‐Jan‐18
22‐Jul‐19
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
3‐Jan‐18
95%
95%
0%
0.053%
0.053%
78
7
PROCESS
3963‐KAHS‐6‐50‐0005
OT
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ HYDROCARBON CONDENSATE LINES
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
3‐Jan‐18
22‐Jul‐19
4‐May‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
3‐Jan‐18
95%
95%
0%
0.053%
0.053%
79
7
PROCESS
3963‐KAHS‐6‐50‐0006
OT
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
3‐Jan‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
3‐Jan‐18
95%
95%
0%
0.053%
0.053%
80
7
PROCESS
3963‐KAHS‐6‐51‐0001
OT
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ DRAIN SYSTEM
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
2‐Jan‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
95%
95%
0%
0.053%
0.053%
23‐Apr‐17
3‐May‐17
8‐May‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
7
PROCESS
3963‐KAHS‐6‐51‐0003
OT
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION
1
A
0.056%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
22‐Jul‐19
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
PROCESS
DEM‐3963‐FAHM‐6‐50‐0001
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐3 PHASE TEST SEPARATOR 14‐V‐1900 (DEMOLIT
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.040%
0.040%
84
7
PROCESS
DEM‐3963‐FAHM‐6‐50‐0002
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐3 PHASE TEST SEPARATOR 14‐V‐1900 CTRL SKID
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.040%
0.040%
85
7
PROCESS
DEM‐3963‐FAHM‐6‐50‐0003
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐HYDROCYCLONE & DEGASSER SKID SHT.2 (DEM
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.040%
86
7
PROCESS
DEM‐3963‐FAHM‐6‐50‐0004
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐GAS & OIL DISTRIBUTION (DEMOLITION)
1
B
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
5‐Oct‐17
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
87
7
PROCESS
DEM‐3963‐FAHM‐6‐50‐0005
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ S.D.V & R.V. STATION & DIST. MANIFOLD (DEM
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
5‐Oct‐17
22‐Jul‐19
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
88
7
PROCESS
DEM‐3963‐FAHM‐6‐51‐0001
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ DRAIN COLLECTION (DEMOLITION)
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
4‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
4‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.040%
0.040%
89
7
PROCESS
DEM‐3963‐FAHM‐6‐51‐0004
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐FLARE COLLECTION (DEMOLITION)
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
27‐Jun‐17
2‐Jul‐17
22‐Jul‐19
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
27‐Jun‐17
2‐Jul‐17
95%
95%
0%
0.040%
0.040%
90
7
PROCESS
DEM‐3963‐FAHM‐6‐51‐0002
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ TANK FLARE COLLECTION (DEMOLITION)
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
27‐Apr‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.040%
0.040%
91
7
PROCESS
DEM‐3963‐FAHM‐6‐51‐0003
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION (DEMOLITION)
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
27‐Sep‐17
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
27‐Sep‐17
95%
95%
0%
0.040%
92
7
PROCESS
DEM‐3963‐KAHS‐6‐51‐0001
DEM
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐DRAIN SYSTEM (DEMOLITION)
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.040%
0.040%
93
7
PROCESS
DEM‐3963‐KAHS‐6‐51‐0003
DEM
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION (DEMOLITIO
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
17‐Jun‐17
22‐Jun‐17
22‐Jul‐19
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
17‐Jun‐17
22‐Jun‐17
95%
95%
0%
0.040%
0.040%
94
7
PROCESS
3963‐FAHM‐6‐51‐0004
OT
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ FLARE COLLECTION
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.040%
0.040%
95
7
PROCESS
3963‐FAHN‐6‐50‐0001
OT
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES
1
B
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
5‐Oct‐17
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.053%
0.053%
96
7
PROCESS
3963‐FAHN‐6‐50‐0002
OT
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐NEW 3 PHASE TEST SEPARATOR 12‐V‐XXX1
1
A
0.083%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
21‐Jan‐18
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
21‐Jan‐18
95%
95%
0%
0.079%
97
7
PROCESS
3963‐FAHN‐6‐50‐0004
OT
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ HYDROCYCLONE & DEGASSER SKID SHT.2
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
2‐Jan‐18
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
98
7
PROCESS
3963‐FAHN‐6‐50‐0005
OT
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐PIG LAUNCHER 12‐Z‐0810
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
2‐Jan‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
99
7
PROCESS
3963‐FAHN‐6‐51‐0001
OT
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐DRAIN SYSTEM
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
2‐Jan‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
14‐May‐17
2‐Jul‐17
26‐Sep‐17
2‐Jan‐18
A
0.056%
22‐Jul‐19
7
1
A
2‐Jul‐17
82
7
1
18‐May‐17
83
100
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ FLARE COLLECTION
31‐Oct‐18
0.053%
PROCESS
OT
9‐Jul‐17
0.053%
7
3963‐KAHS‐6‐51‐0002
29‐Jun‐17
0%
7
PROCESS
8‐Jun‐17
95%
75
7
8‐May‐17
95%
76
81
3‐May‐17
14‐May‐17
22‐Jul‐19
7
OT
4‐May‐17
14‐Jan‐18
72
7
PROCESS
5‐Oct‐17
73 74
7
2‐Jul‐17
5‐Apr‐17
3‐May‐17
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ HYDROCYCLONE & DEGASSER SKID SHT.2
18‐May‐17
2‐Apr‐17
30‐Apr‐17
OT
23‐Apr‐17
22‐Jul‐19
18‐Apr‐17
OT
0.056%
5‐Apr‐17
22‐Jul‐19
3963‐FAHM‐6‐50‐0001
A
2‐Apr‐17
2‐Jan‐18
3963‐FAHM‐6‐50‐0003
1
31‐Oct‐18
26‐Sep‐17
PROCESS
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ GAS & OIL DISTRIBUTION
3‐Jul‐17
22‐Jun‐17
PROCESS
OT
23‐Jun‐17
3‐May‐17
7
3963‐FAHM‐6‐50‐0004
2‐Jun‐17
30‐Apr‐17
7
PROCESS
2‐May‐17
18‐Apr‐17
66
7
DEM
17‐Apr‐17
67 68
7
0.056%
0.053%
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
PROCESS
3963‐FAHN‐6‐51‐0002
OT
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐PROCESS FLARE K.O DRUM 12‐V‐4017
31‐Oct‐18
11‐May‐17
22‐Jul‐19
11‐May‐17
7
PROCESS
3963‐FAHN‐6‐51‐0003
OT
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
25‐Sep‐17
2‐Jan‐18
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
25‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
7
PROCESS
3963‐FAHS‐6‐50‐0001
OT
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
103
7
PROCESS
3963‐FAHS‐6‐50‐0002
OT
31‐Oct‐18
3‐Jul‐17
28‐Sep‐17
4‐Jul‐17
14‐Jul‐17
14‐Jul‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
26‐Sep‐17
2‐Jan‐18
18‐May‐17
95%
95%
0%
0.053%
0.079%
101
13‐Jun‐17
4‐Jul‐17
22‐Jul‐19
0.040%
102
13‐May‐17
13‐Jun‐17
4‐May‐17
0.040%
0.053%
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 13‐V‐XXX1 CT
1
A
0.083%
28‐Apr‐17
8‐May‐17
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
21‐Jan‐18
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
21‐Jan‐18
95%
95%
0%
0.079%
0.079%
104
7
PROCESS
3963‐FAHS‐6‐50‐0004
OT
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ HYDROCYCLONE & DEGASSER SKID SHT. 2
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
105
7
PROCESS
3963‐FAHS‐6‐50‐0005
OT
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ PIG LAUNCHER 13‐Z‐0403
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
106
7
PROCESS
3963‐FAHS‐6‐51‐0001
OT
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐DRAIN SYSTEM
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
107
7
PROCESS
3963‐FAHS‐6‐51‐0002
OT
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐PROCESS FLARE K.O DRUM 13‐V‐4043
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.053%
0.053%
108
7
PROCESS
3963‐FAHS‐6‐51‐0003
OT
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION SYSTEM
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
4‐May‐17
13‐May‐17
14‐May‐17
15‐May‐17
18‐May‐17
18‐May‐17
28‐Sep‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
13‐May‐17
15‐May‐17
18‐May‐17
28‐Sep‐17
2‐Jan‐18
95%
95%
95%
95%
0%
0%
0.053%
0.053%
0.053%
0.053%
109
7
PROCESS
DEM‐3963‐FAHN‐6‐50‐0001
DEM
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES (DEMOLITION
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
110
7
PROCESS
DEM‐3963‐FAHN‐6‐50‐0002
DEM
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐3 PHASE TEST SEPARATOR 12‐V‐0800 (DEMOL
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
111
7
PROCESS
DEM‐3963‐FAHN‐6‐50‐0003
DEM
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐3 PHASE TEST SEPARATOR 12‐V‐0800 CTRL SKI
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
112
7
PROCESS
DEM‐3963‐FAHN‐6‐50‐0004
DEM
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐HYDROCYCLONE & DEGASSER SKID SHT 2 (DEM
1
A
0.056%
8‐May‐17
13‐May‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
113
7
PROCESS
DEM‐3963‐FAHN‐6‐50‐0005
DEM
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ PIG LAUNCHER 12‐Z‐0810 (DEMOLITION)
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
5‐Oct‐17
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
5‐Oct‐17
95%
95%
0%
0.053%
0.053%
114
7
PROCESS
DEM‐3963‐FAHN‐6‐51‐0001
DEM
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ DRAIN SYSTEM (DEMOLITION)
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
115
7
PROCESS
DEM‐3963‐FAHN‐6‐51‐0002
DEM
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐PROCESS FLARE K.O DRUM 12‐V‐4017 (DEMO
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
3‐Jan‐18
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
2‐Jul‐17
3‐Jan‐18
95%
95%
0%
0.053%
0.053%
116
7
PROCESS
DEM‐3963‐FAHN‐6‐51‐0003
DEM
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION (DEMOLITION
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
117
7
PROCESS
DEM‐3963‐FAHS‐6‐50‐0001
DEM
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES (DEMOLITION
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
118
7
PROCESS
DEM‐3963‐FAHS‐6‐50‐0002
DEM
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 13‐V‐400 (DEMOLIT
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
4‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
4‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
119
7
PROCESS
DEM‐3963‐FAHS‐6‐50‐0003
DEM
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEP. 13‐V‐400 CTRL SKID (DEMO
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
120
7
PROCESS
DEM‐3963‐FAHS‐6‐50‐0004
DEM
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ HYDROCYCLONE & DEGASSER SKID SHT 2 (DEM
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
0.053%
121
7
PROCESS
DEM‐3963‐FAHS‐6‐50‐0005
DEM
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ PIG LAUNCHER 13‐Z‐0403 (DEMOLITION)
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
11‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.053%
122
7
PROCESS
DEM‐3963‐FAHS‐6‐51‐0001
DEM
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ DRAIN SYSTEM (DEMOLITION)
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
19‐Sep‐17
20‐Sep‐17
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.053%
0.053%
123
7
PROCESS
DEM‐3963‐FAHS‐6‐51‐0002
DEM
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ PROCESS FLARE K.O DRUM 13‐V‐4043 (DEMO
1
A
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.053%
0.053%
28‐Apr‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
Page 1 of 13
2‐Jul‐17
12‐Jul‐17
17‐Jul‐17
2‐Jul‐17
12‐Jul‐17
Page 72 of 170
0.053%
0.053%
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC DESC
DOC CLASS
ITEM DOC DOC DESC CODE CLASS DEM P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION SYSTEM (DEM 1
CURRENT REVISION CURRENT REVISION A
SHUTD OWN PACKA GE SHUTD OWN
Original BL WV
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100% ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
SEQ
PLIFA
PLIAWH
PLIAFC
PLASBUILT
ACTS
ACTIFA
ACTIAWH
ACTIAFC
124
7
PROCESS
DEM‐3963‐FAHS‐6‐51‐0003
0.056%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
19‐Sep‐17
20‐Sep‐17
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
19‐Sep‐17
20‐Sep‐17
125
7
PROCESS
3963‐JALM‐6‐50‐0003
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ MANIFOLD SHUTDOWN VALVES
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
126
7
PROCESS
3963‐JALM‐6‐50‐0004
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ OIL STABILIZATION HEAT EXCH. 31‐E‐4002
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
11‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
11‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ DEGASSER VESSEL 31‐V‐4009
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
7
PROCESS
DOC NO
ITEM CODE
SRN
127
DISCIPLINE
DOC NO
3963‐JALM‐6‐50‐0005
OT
WV
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
PLS
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
3963‐JALM‐6‐50‐0006
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ PRODUCED GAS K.O. POT 31‐V‐5020
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ WET LIFTGAS KO DRUM 31‐V‐4901
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
95%
0%
0.079%
0.053%
3963‐JALM‐6‐50‐0007
4‐May‐17
95%
Actual WF
PROCESS
9‐Jul‐17
2‐Jan‐18
0.053%
PROCESS
15‐Jul‐17
9‐Jul‐17
Plan WF
7
5‐Jul‐17
9‐Jul‐17
ACTIFC
7
14‐Jun‐17
22‐May‐17
ACTD
128
14‐May‐17
20‐May‐17
PLIFC
129
9‐May‐17
4‐May‐17
PLD
0.079%
130
7
PROCESS
3963‐JALM‐6‐50‐0008
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ GAS GATHERING STATION
1
A
0.083%
29‐Apr‐17
131
7
PROCESS
3963‐JALM‐6‐50‐0009
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR MANIFOLD SHUTDOW
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.079%
132
7
PROCESS
3963‐JALM‐6‐51‐0001
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ DRAIN COLLECTION
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
133
7
PROCESS
3963‐JALM‐6‐51‐0002
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐FLARE COLLECTION
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
9‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
11‐Oct‐17
11‐Oct‐17
0.079%
134
7
PROCESS
3963‐JALM‐6‐51‐0003
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐INSTRUMENT AIR DISTRIBUTION
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
135
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0001
DEM
P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 31‐V‐42 (DEMOLITION
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
11‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
22‐Jul‐19
11‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
95%
95%
0%
0.079%
0.079%
136
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0002
DEM
P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐3 PHASE TEST SEPARATOR 31‐V‐42, CONR. SKID (
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
11‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
27‐Sep‐17
27‐Sep‐17
22‐Jul‐19
11‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
27‐Sep‐17
27‐Sep‐17
95%
95%
0%
0.079%
137
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0003
DEM
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES (DEMOLITION)
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
22‐Jul‐19
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
95%
95%
0%
0.079%
0.079%
138
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0004
DEM
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐OIL STABILIZATION HEAT EXCH. 31‐E‐4002 (DEMO
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
22‐Jul‐19
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
95%
95%
0%
0.079%
0.079%
139
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0005
DEM
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐DEGASSER VESSEL 31‐V4009 (DEMOLITION)
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
22‐Jul‐19
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
95%
95%
0%
0.079%
0.079% 0.053%
0.079%
140
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0006
DEM
P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐PRODUCED GAS KO POT 31‐V5020 (DEMOLITION
1
A
0.056%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
22‐Jul‐19
3‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
95%
95%
0%
0.053%
141
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0007
DEM
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐WET LIFTGAS KO DRUM 31‐V‐4901 (DEMOLITION
1
A
0.056%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
11‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
22‐Jul‐19
11‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
23‐Jul‐17
24‐Jul‐17
95%
95%
0%
0.053%
142
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0008
DEM
P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐GAS GATHERING STATION (DEMOLITION)
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
28‐Sep‐17
2‐Jan‐18
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
28‐Sep‐17
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
143
7
PROCESS
DEM‐3963‐JALM‐6‐50‐0009
DEM
P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐3 PHASE TEST SEPARATOR MANIFOLD SHUT DOW
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
28‐Sep‐17
19‐Oct‐17
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
28‐Sep‐17
19‐Oct‐17
95%
95%
0%
0.079%
0.079%
144
7
PROCESS
DEM‐3963‐JALM‐6‐51‐0003
DEM
P&ID FOR DUKHAN ‐ JALEHA MAIN DEGASSING STATION ‐ INSTRUMENT AIR DISTRIBUTION (DEMOLITION)
1
A
0.056%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
26‐Jul‐17
27‐Jul‐17
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
26‐Jul‐17
27‐Jul‐17
95%
95%
0%
0.053%
0.053%
11‐May‐17
20‐May‐17
22‐May‐17
11‐May‐17
20‐May‐17
22‐May‐17
145
7
PROCESS
3963‐JALM‐6‐50‐0001
21‐Jan‐18
22‐Jul‐19
146
7
PROCESS
3963‐DGEN‐6‐05‐0001
OT
PROCESS DESCRIPTION
1
A
0.111%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
4‐May‐17
10‐Jun‐17
11‐Jun‐17
18‐Sep‐17
28‐Sep‐17
28‐Sep‐17
22‐Jul‐19
4‐May‐17
10‐Jun‐17
11‐Jun‐17
18‐Sep‐17
28‐Sep‐17
28‐Sep‐17
95%
95%
0%
0.106%
0.106%
147
7
PROCESS
3963‐DGEN‐6‐17‐0002
OT
UTILITY ADEQUACY REPORT
1
A
0.069%
12‐May‐17
22‐May‐17
27‐May‐17
27‐Jun‐17
18‐Jul‐17
28‐Jul‐17
31‐Oct‐18
25‐May‐17
29‐Aug‐17
30‐Aug‐17
27‐Sep‐17
27‐Sep‐17
27‐Sep‐17
22‐Jul‐19
25‐May‐17
29‐Aug‐17
30‐Aug‐17
27‐Sep‐17
27‐Sep‐17
27‐Sep‐17
95%
95%
0%
0.066%
0.066%
0.139%
21‐May‐17
31‐May‐17
31‐Oct‐18
22‐Jul‐19
1
A
0.056%
B
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
6‐Aug‐17
31‐Oct‐18
9‐Jul‐17
9‐Jul‐17
9‐Jul‐17
9‐Jul‐17
21‐Jan‐18
95%
95%
95%
95%
0%
0%
0.053%
0.132%
0.053%
7
PROCESS
5‐Jun‐17
6‐Jul‐17
25‐May‐17
11‐Jul‐17
12‐Jul‐17
3‐Oct‐17
29‐Oct‐17
29‐Oct‐17
25‐May‐17
11‐Jul‐17
12‐Jul‐17
3‐Oct‐17
29‐Oct‐17
29‐Oct‐17
7
PROCESS
3963‐DGEN‐6‐03‐0003
OT
SHUTDOWN AND CHANGEOVER PHILOSOPHY
1
A
0.111%
13‐Jul‐17
25‐Jul‐17
30‐Jul‐17
27‐Aug‐17
11‐Sep‐17
18‐Sep‐17
31‐Oct‐18
8‐Jul‐17
25‐Oct‐17
26‐Oct‐17
26‐Nov‐17
4‐Dec‐17
4‐Dec‐17
22‐Jul‐19
8‐Jul‐17
25‐Oct‐17
26‐Oct‐17
26‐Nov‐17
4‐Dec‐17
4‐Dec‐17
95%
95%
0%
0.106%
0.106%
7
PROCESS
3963‐DGEN‐6‐12‐0002
OT
RELIEF VALVE SIZING CALCULATION
3
A
0.111%
13‐Jun‐17
23‐Jun‐17
28‐Jun‐17
29‐Jul‐17
19‐Aug‐17
29‐Aug‐17
31‐Oct‐18
9‐Jul‐17
7‐Aug‐17
9‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
9‐Jul‐17
7‐Aug‐17
9‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.106%
0.106%
151
7
PROCESS
3963‐DGEN‐6‐12‐0003
OT
BLOWDOWN CALCULATION
1
A
0.097%
3‐Jul‐17
13‐Jul‐17
18‐Jul‐17
18‐Aug‐17
8‐Sep‐17
18‐Sep‐17
31‐Oct‐18
3‐Jul‐17
19‐Aug‐17
22‐Aug‐17
27‐Sep‐17
12‐Oct‐17
12‐Oct‐17
22‐Jul‐19
3‐Jul‐17
19‐Aug‐17
22‐Aug‐17
27‐Sep‐17
12‐Oct‐17
12‐Oct‐17
95%
95%
0%
0.092%
0.092%
3963‐DGEN‐6‐17‐0004
OT
11‐Aug‐17
22‐Jul‐19
11‐Jun‐17
5‐Jun‐17
27‐Jul‐17
15‐Jul‐17
148
PROCESS
OPERATING CONTROL & SAFEGUARDING & SHUTDOWN PHILOSOPHY
1
150
7
OT
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐NEW 3 PHASE TEST SEPARATOR 31‐V‐XXX1
149
152
3963‐DGEN‐6‐03‐0001
OT
0.053%
0.132%
HYDRAULIC ANALYSIS /LINE SIZING CALCULATION REPORT
3
A
0.111%
15‐Jun‐17
20‐Jun‐17
21‐Jul‐17
21‐Aug‐17
31‐Oct‐18
2‐Apr‐17
10‐Jun‐17
11‐Jun‐17
17‐Aug‐17
17‐Aug‐17
17‐Aug‐17
2‐Apr‐17
10‐Jun‐17
17‐Aug‐17
17‐Aug‐17
17‐Aug‐17
95%
95%
0%
0.106%
0.106%
153
7
PROCESS
3963‐DGEN‐6‐22‐0001
OT
STARTUP, SHUTDOWN & OPERATING MANUALS
1
A
0.222%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
20‐Aug‐18
1‐Sep‐18
24‐Dec‐18
31‐Dec‐18
31‐Dec‐18
22‐Jul‐19
27‐Jul‐17
20‐Aug‐18
1‐Sep‐18
40%
40%
0%
0.089%
0.089%
154
7
PROCESS
DEM‐3963‐FAHM‐6‐50‐0006
DEM
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION – THREE PHASE SEPARATOR 14‐V‐4001 (DEMOL
1
A
0.083%
20‐Sep‐17
25‐Sep‐17
30‐Sep‐17
15‐Oct‐17
9‐Nov‐17
29‐Nov‐17
31‐Oct‐18
17‐Sep‐17
18‐Sep‐17
20‐Sep‐17
18‐Dec‐17
2‐Jan‐18
2‐Jan‐18
22‐Jul‐19
17‐Sep‐17
18‐Sep‐17
20‐Sep‐17
18‐Dec‐17
2‐Jan‐18
2‐Jan‐18
95%
95%
0%
0.079%
0.079%
155
7
PROCESS
DEM‐3963‐KAHN‐6‐51‐0002
DEM
P&ID FOR DUKHAN – KHATIYAH NORTH DEGASSING STATION – INSTRUMENT AIR RECEIVER 22‐V‐7330 (DE
1
A
0.083%
20‐Sep‐17
25‐Sep‐17
30‐Sep‐17
15‐Oct‐17
9‐Nov‐17
29‐Nov‐17
31‐Oct‐18
17‐Sep‐17
18‐Sep‐17
20‐Sep‐17
17‐Dec‐17
3‐Jan‐18
3‐Jan‐18
22‐Jul‐19
17‐Sep‐17
18‐Sep‐17
20‐Sep‐17
17‐Dec‐17
3‐Jan‐18
3‐Jan‐18
95%
95%
0%
0.079%
0.079%
156
8
PROCESS
3963‐DGEN‐6‐00‐0002
OT
MISCELLANEOUS ‐ PROCESS
0
0.111%
31‐Aug‐17
6‐Sep‐17
7‐Sep‐17
14‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
12‐Jan‐18
12‐Jan‐18
15‐Jan‐18
8‐Feb‐18
8‐Mar‐18
8‐Mar‐18
22‐Jul‐19
12‐Jan‐18
12‐Jan‐18
15‐Jan‐18
8‐Feb‐18
8‐Mar‐18
8‐Mar‐18
95%
95%
0%
0.106%
157
7
PROCESS
3963‐DGEN‐6‐03‐0002
OT
PRE‐COMMISSIONING, COMMISSIONING PHILOSOPHY
1
0
0.139%
27‐Jun‐17
7‐Jul‐17
12‐Jul‐17
12‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
28‐Jun‐17
22‐Jan‐18
24‐Jan‐18
6‐Aug‐18
24‐Sep‐18
24‐Sep‐18
22‐Jul‐19
28‐Jun‐17
22‐Jan‐18
24‐Jan‐18
6‐Aug‐18
24‐Sep‐18
24‐Sep‐18
95%
95%
0%
0.132%
0.132%
158
7
PROCESS
3963‐DGEN‐6‐17‐0003
OT
FLARE ADEQUACY REPORT
1
A
0.111%
18‐Jun‐17
28‐Jun‐17
3‐Jul‐17
3‐Aug‐17
24‐Aug‐17
3‐Sep‐17
31‐Oct‐18
22‐Jun‐17
16‐Oct‐17
17‐Oct‐17
22‐Jan‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
22‐Jun‐17
16‐Oct‐17
17‐Oct‐17
22‐Jan‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.106%
0.106%
159
7
PROCESS
3963‐KAHM‐6‐50‐0004
OT
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEP.24‐V‐XX1 CTRL SKID
1
B
0.083%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
11‐Mar‐18
22‐Jul‐19
18‐Apr‐17
3‐May‐17
3‐May‐17
15‐Jun‐17
26‐Sep‐17
11‐Mar‐18
95%
95%
0%
0.079%
0.079%
160
7
OT
18‐Apr‐17
18‐Apr‐17
30‐Apr‐17
22‐Jun‐17
PROCESS
3963‐KAHN‐6‐50‐0002
P&ID FOR DUKHAN ‐ KHATIYAH NORTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 22‐V‐XXX1 CTRL S
1
B
0.083%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
30‐Apr‐17
3‐May‐17
26‐Sep‐17
11‐Mar‐18
22‐Jul‐19
26‐Sep‐17
11‐Mar‐18
95%
95%
0%
0.079%
0.079%
161
7
PROCESS
3963‐FAHM‐6‐50‐0002
OT
P&ID FOR DUKHAN ‐ FAHAHIL MAIN DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 14‐V‐XXX1, CTR
1
B
0.083%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
11‐Mar‐18
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
18‐May‐17
2‐Jul‐17
5‐Oct‐17
11‐Mar‐18
95%
95%
0%
0.079%
0.079%
162
7
PROCESS
3963‐KAHS‐6‐50‐0002
OT
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 23‐V‐XXX1 C
1
B
0.083%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
30‐Jan‐18
22‐Jul‐19
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
11‐Oct‐17
30‐Jan‐18
95%
95%
0%
0.079%
0.079%
PROCESS
3963‐FAHN‐6‐50‐0003
OT
P&ID FOR DUKHAN ‐ FAHAHIL NORTH DEGASSING STATION ‐ 3 PHASE TEST SEP. 12‐V‐XXX1 CTRL SKID
163
7
13‐May‐17
1
B
0.083%
28‐Apr‐17
8‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
18‐May‐17
2‐Jul‐17
11‐Mar‐18
22‐Jul‐19
18‐May‐17
2‐Jul‐17
11‐Mar‐18
95%
95%
0%
0.079%
0.079%
164
7
PROCESS
3963‐FAHS‐6‐33‐0001
OT
LINE DESIGNATION TABLE ‐ FAHAHIL SOUTH DEGASSING STATION
1
A
0.056%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
26‐Sep‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
22‐Jul‐19
1‐Jun‐17
26‐Sep‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
95%
95%
0%
0.053%
0.053%
7
PROCESS
3963‐FAHS‐6‐50‐0003
OT
P&ID FOR DUKHAN ‐ FAHAHIL SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEP. 13‐V‐XXX1 CTRL SKID
1
B
0.083%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
11‐Mar‐18
22‐Jul‐19
3‐May‐17
14‐May‐17
18‐May‐17
3‐Jul‐17
28‐Sep‐17
11‐Mar‐18
95%
95%
0%
0.079%
0.079%
4‐May‐17
14‐May‐17
26‐Sep‐17
3963‐JALM‐6‐50‐0002
OT
3‐May‐17
20‐May‐17
22‐May‐17
3‐May‐17
20‐May‐17
22‐May‐17
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐ NEW 3 PHASE TEST SEPARATOR 31‐V‐XXX1, CTRL
1
B
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
9‐Jul‐17
9‐Jul‐17
11‐Mar‐18
22‐Jul‐19
9‐Jul‐17
9‐Jul‐17
11‐Mar‐18
167
7
PROCESS
3963‐DGEN‐6‐30‐0001
OT
EQUIPMENT LIST
1
A
0.097%
6‐May‐17
16‐May‐17
21‐May‐17
21‐Jun‐17
12‐Jul‐17
22‐Jul‐17
31‐Oct‐18
11‐May‐17
4‐Jun‐17
4‐Jun‐17
27‐Jul‐17
28‐Sep‐17
18‐Jan‐18
22‐Jul‐19
11‐May‐17
4‐Jun‐17
4‐Jun‐17
27‐Jul‐17
28‐Sep‐17
18‐Jan‐18
95%
95%
0%
0.092%
0.092%
7
PROCESS
3963‐FAHM‐6‐33‐0001
OT
LINE DESIGNATION TABLE ‐ FAHAHIL MAIN DEGASSING STATION
1
A
0.111%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
26‐Sep‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
22‐Jul‐19
31‐May‐17
26‐Sep‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
95%
95%
0%
0.106%
0.106%
20‐Jun‐17
21‐Jul‐17
169
7
7
PROCESS
PROCESS
3963‐FAHN‐6‐33‐0001
A
0.069%
5‐Jun‐17
11‐Aug‐17
21‐Aug‐17
26‐Sep‐17
26‐Sep‐17
31‐Oct‐18
7‐Jun‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
22‐Jul‐19
7‐Jun‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
PROCESS
3963‐JALM‐6‐33‐0001
OT
LINE DESIGNATION TABLE ‐ JALEHA MAIN DEGASSING STATION
1
A
0.056%
5‐Jun‐17
15‐Jun‐17
20‐Jun‐17
21‐Jul‐17
11‐Aug‐17
21‐Aug‐17
31‐Oct‐18
7‐Jun‐17
26‐Sep‐17
28‐Sep‐17
14‐Jan‐18
24‐Jan‐18
24‐Jan‐18
22‐Jul‐19
7‐Jun‐17
26‐Sep‐17
28‐Sep‐17
14‐Jan‐18
24‐Jan‐18
24‐Jan‐18
95%
95%
0%
0.053%
0.053%
3963‐KAHM‐6‐33‐0001
OT
LINE DESIGNATION TABLE ‐ KHATIYAH MAIN DEGASSING STATION
1
A
0.056%
13‐Jun‐17
23‐Jun‐17
28‐Jun‐17
29‐Jul‐17
19‐Aug‐17
29‐Aug‐17
31‐Oct‐18
8‐Jul‐17
26‐Sep‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
22‐Jul‐19
8‐Jul‐17
26‐Sep‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
95%
95%
0%
0.053%
0.053%
95%
7
PROCESS
1
A
0.056%
23‐Jun‐17
28‐Jun‐17
29‐Jul‐17
19‐Aug‐17
29‐Aug‐17
31‐Oct‐18
11‐Jul‐17
26‐Sep‐17
28‐Sep‐17
24‐Jan‐18
24‐Jan‐18
22‐Jul‐19
11‐Jul‐17
26‐Sep‐17
28‐Sep‐17
24‐Jan‐18
24‐Jan‐18
PROCESS
3963‐KAHS‐6‐33‐0001
OT
LINE DESIGNATION TABLE ‐ KHATIYAH SOUTH DEGASSING STATION
1
A
0.056%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
8‐Jul‐17
26‐Sep‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
22‐Jul‐19
8‐Jul‐17
26‐Sep‐17
28‐Sep‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
95%
95%
0%
0.053%
0.053%
7
PROCESS
DEM‐3963‐KAHM‐6‐50‐0005
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ GAS GATHERING STATION, P&ID (DEMOLITIO
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
5‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
175
7
PROCESS
DEM‐3963‐KAHM‐6‐50‐0006
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR CRUDE OIL FROM K
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
5‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
176
7
PROCESS
DEM‐3963‐KAHM‐6‐51‐0001
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ DRAIN COLLECTION, P&ID (DEMOLITION)
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
5‐Oct‐17
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
177
7
PROCESS
DEM‐3963‐KAHM‐6‐51‐0002
DEM
P&ID FOR DUKHAN ‐ KHATIYAH MAIN DEGASSING STATION ‐ PROCESS FLARE COLLECTION, P&ID (DEMOLIT
1
A
0.042%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
5‐Oct‐17
22‐Jul‐19
19‐Apr‐17
30‐Apr‐17
3‐May‐17
15‐Jun‐17
24‐Aug‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
178
7
PROCESS
DEM‐3963‐KAHS‐6‐50‐0001
DEM
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR 23‐V‐7200 (DEMO
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
22‐Jul‐19
4‐May‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
95%
95%
0%
0.040%
0.040%
179
7
PROCESS
DEM‐3963‐KAHS‐6‐50‐0002
DEM
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐ 3 PHASE TEST SEPARATOR CONTROL SKID 23
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
4‐May‐17
22‐Jul‐19
4‐May‐17
180
7
PROCESS
DEM‐3963‐KAHS‐6‐50‐0003
DEM
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐3 PHASE TEST SEPARATOR HEADERS (DEMOL
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
22‐Jul‐19
2‐Apr‐17
5‐Apr‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
95%
95%
0%
0.040%
0.040%
181
7
PROCESS
DEM‐3963‐KAHS‐6‐50‐0004
DEM
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐DEGASSING VESSEL 23‐V‐7280 (DEMOLITION
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
2‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
22‐Jul‐19
2‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
95%
95%
0%
0.040%
0.040%
182
7
PROCESS
DEM‐3963‐KAHS‐6‐50‐0005
DEM
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐HYDROCARBON CONDENSATE LINES (DEMOL
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
22‐Jul‐19
27‐Apr‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
95%
95%
0%
0.040%
0.040%
183
7
PROCESS
DEM‐3963‐KAHS‐6‐50‐0006
DEM
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐MANIFOLD SHUTDOWN VALVES (DEMOLITIO
23‐Apr‐17
3‐May‐17
8‐May‐17
22‐Jul‐19
95%
8‐Jun‐17
29‐Jun‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
22‐Jun‐17
29‐Nov‐17
P&ID FOR DUKHAN ‐ KHATIYAH SOUTH DEGASSING STATION ‐FLARE COLLECTION (DEMOLITION)
1
A
0.042%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
24‐Aug‐17
29‐Nov‐17
22‐Jul‐19
4‐May‐17
9‐May‐17
10‐May‐17
22‐Jun‐17
24‐Aug‐17
29‐Nov‐17
95%
95%
0%
0.040%
0.040%
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐DRAIN COLLECTION (DEMOLITION)
1
A
0.083%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
15‐Oct‐17
29‐Nov‐17
22‐Jul‐19
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
15‐Oct‐17
29‐Nov‐17
95%
95%
0%
0.079%
0.079%
PROCESS
DEM‐3963‐JALM‐6‐51‐0002
14‐May‐17
29‐Nov‐17
29‐Nov‐17
P&ID FOR DUKHAN ‐JALEHA MAIN DEGASSING STATION ‐FLARE COLLECTION (DEMOLITION)
1
A
0.083%
29‐Apr‐17
9‐May‐17
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
15‐Oct‐17
4‐May‐17
20‐May‐17
22‐May‐17
9‐Jul‐17
15‐Oct‐17
187
8
PIPING
3963‐DGEN‐5‐14‐0001
OT
DUKHAN FIELD; PIPING MATERIAL SPECIFICATIONS
1
A
0.140%
13‐Apr‐17
23‐Apr‐17
28‐Apr‐17
29‐May‐17
19‐Jun‐17
29‐Jun‐17
31‐Oct‐18
19‐Apr‐17
27‐May‐17
28‐May‐17
20‐Aug‐17
30‐Aug‐17
8‐Oct‐17
22‐Jul‐19
19‐Apr‐17
27‐May‐17
28‐May‐17
20‐Aug‐17
30‐Aug‐17
8‐Oct‐17
95%
95%
0%
0.133%
0.133%
8
PIPING
3963‐DGEN‐5‐14‐0002
OT
DUKHAN FIELD; TECHNICAL SPECIFICATION FOR PIPING STRESS ANALYSIS
1
A
0.084%
10‐Apr‐17
20‐Apr‐17
25‐Apr‐17
26‐May‐17
16‐Jun‐17
26‐Jun‐17
31‐Oct‐18
29‐Mar‐17
29‐Mar‐17
19‐Apr‐17
25‐May‐17
11‐Jun‐17
11‐Jun‐17
22‐Jul‐19
29‐Mar‐17
29‐Mar‐17
19‐Apr‐17
25‐May‐17
11‐Jun‐17
11‐Jun‐17
95%
95%
0%
0.080%
0.080%
1
A
21‐May‐17
11‐Jun‐17
21‐Jun‐17
31‐Oct‐18
5‐Apr‐17
24‐Apr‐17
27‐Apr‐17
11‐Jul‐17
12‐Jul‐17
13‐Jul‐17
22‐Jul‐19
5‐Apr‐17
24‐Apr‐17
27‐Apr‐17
11‐Jul‐17
12‐Jul‐17
13‐Jul‐17
95%
95%
0%
0.080%
0.080%
190
8
PIPING
3963‐DGEN‐5‐14‐0005
OT
DUKHAN FIELD; TECHNICAL SPECIFICATION FOR FITTINGS & FLANGES
1
A
0.084%
5‐Apr‐17
15‐Apr‐17
20‐Apr‐17
21‐May‐17
11‐Jun‐17
21‐Jun‐17
31‐Oct‐18
29‐Mar‐17
24‐Apr‐17
27‐Apr‐17
20‐Jun‐17
20‐Jun‐17
20‐Jun‐17
22‐Jul‐19
29‐Mar‐17
24‐Apr‐17
27‐Apr‐17
20‐Jun‐17
20‐Jun‐17
20‐Jun‐17
95%
95%
0%
0.080%
0.080%
8
PIPING
3963‐DGEN‐5‐14‐0006
OT
DUKHAN FIELD; TECHNICAL SPECIFICATION FOR MANUAL VALVES
1
B
0.084%
1‐Apr‐17
11‐Apr‐17
16‐Apr‐17
17‐May‐17
7‐Jun‐17
17‐Jun‐17
31‐Oct‐18
5‐Apr‐17
16‐Apr‐17
19‐Apr‐17
13‐Jun‐17
13‐Jun‐17
13‐Jun‐17
22‐Jul‐19
5‐Apr‐17
16‐Apr‐17
19‐Apr‐17
13‐Jun‐17
13‐Jun‐17
13‐Jun‐17
95%
95%
0%
0.080%
192
8
PIPING
3963‐DGEN‐5‐13‐0001
OT
DUKHAN FIELD; DATA SHEETS FOR BALL VALVES
1
B
0.168%
5‐Mar‐17
10‐Mar‐17
14‐Mar‐17
14‐Apr‐17
5‐May‐17
15‐May‐17
31‐Oct‐18
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
1‐May‐17
7‐Jun‐17
7‐Jun‐17
22‐Jul‐19
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
1‐May‐17
7‐Jun‐17
7‐Jun‐17
95%
95%
0%
0.160%
0.160%
193
8
PIPING
3963‐DGEN‐5‐13‐0002
OT
DUKHAN FIELD; DATA SHEET FOR GATE VALVES
1
A
0.112%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
20‐Apr‐17
16‐May‐17
16‐May‐17
5‐Jun‐17
21‐Jun‐17
21‐Jun‐17
22‐Jul‐19
20‐Apr‐17
16‐May‐17
16‐May‐17
5‐Jun‐17
21‐Jun‐17
21‐Jun‐17
95%
95%
0%
0.106%
0.106%
194
8
PIPING
3963‐DGEN‐5‐13‐0003
OT
DUKHAN FIELD; DATA SHEET FOR GLOBE VALVES
1
A
0.112%
20‐Apr‐17
30‐Apr‐17
5‐May‐17
5‐Jun‐17
26‐Jun‐17
6‐Jul‐17
31‐Oct‐18
19‐Apr‐17
19‐May‐17
21‐May‐17
13‐Jun‐17
11‐Jul‐17
12‐Jul‐17
22‐Jul‐19
19‐Apr‐17
19‐May‐17
21‐May‐17
13‐Jun‐17
11‐Jul‐17
12‐Jul‐17
95%
95%
0%
0.106%
0.106%
195
8
PIPING
3963‐DGEN‐5‐13‐0004
DUKHAN FIELD; DATA SHEET FOR CHECK VALVES
1
B
0.112%
25‐Apr‐17
5‐May‐17
10‐May‐17
20‐Apr‐17
19‐May‐17
21‐May‐17
13‐Jun‐17
20‐Apr‐17
19‐May‐17
21‐May‐17
13‐Jun‐17
23‐Jul‐17
95%
95%
0%
0.106%
0.106%
196
8
PIPING
3963‐DGEN‐5‐13‐0005
OT
DUKHAN FIELD; DATA SHEET FOR NEEDLE VALVES
1
A
0.084%
30‐Apr‐17
10‐May‐17
15‐May‐17
15‐Jun‐17
6‐Jul‐17
16‐Jul‐17
31‐Oct‐18
5‐Apr‐17
30‐May‐17
31‐May‐17
21‐Jun‐17
12‐Jul‐17
13‐Jul‐17
22‐Jul‐19
5‐Apr‐17
30‐May‐17
31‐May‐17
21‐Jun‐17
12‐Jul‐17
13‐Jul‐17
95%
95%
0%
0.080%
0.080%
197
8
PIPING
3963‐DGEN‐5‐13‐0006
OT
DUKHAN FIELD; DATASHEET FOR CORROSION COUPON & CORROSION PROBES
1
A
0.112%
10‐May‐17
20‐May‐17
25‐May‐17
25‐Jun‐17
16‐Jul‐17
26‐Jul‐17
31‐Oct‐18
11‐May‐17
8‐Jun‐17
8‐Jun‐17
25‐Jul‐17
25‐Jul‐17
14‐Sep‐17
22‐Jul‐19
11‐May‐17
8‐Jun‐17
8‐Jun‐17
25‐Jul‐17
25‐Jul‐17
14‐Sep‐17
95%
95%
0%
0.106%
0.106%
198
8
PIPING
3963‐DGEN‐5‐15‐0001
OT
DUKHAN FIELD; MATERIAL REQUISITION FOR MANUAL VALVES (GATE, GLOBE & CHECK)
1
A
0.070%
22‐May‐17
1‐Jun‐17
6‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
25‐May‐17
6‐Jun‐17
6‐Jun‐17
11‐Jul‐17
15‐Jul‐17
20‐Jul‐17
22‐Jul‐19
25‐May‐17
6‐Jun‐17
6‐Jun‐17
11‐Jul‐17
15‐Jul‐17
20‐Jul‐17
95%
95%
0%
0.067%
0.067%
199
8
PIPING
3963‐DGEN‐5‐15‐0002
OT
DUKHAN FIELD; MATERIAL REQUISITION FOR PIPING BULK ITEMS
1
A
0.070%
3‐Jun‐17
13‐Jun‐17
18‐Jun‐17
19‐Jul‐17
9‐Aug‐17
19‐Aug‐17
31‐Oct‐18
7‐Jun‐17
12‐Jul‐17
13‐Jul‐17
1‐Aug‐17
10‐Aug‐17
10‐Aug‐17
22‐Jul‐19
7‐Jun‐17
12‐Jul‐17
13‐Jul‐17
1‐Aug‐17
10‐Aug‐17
10‐Aug‐17
95%
95%
0%
0.067%
0.067%
200
8
PIPING
3963‐DGEN‐5‐15‐0003
OT
DUKHAN FIELD; MATERIAL REQUISITIONS FOR BALL VALVES
1
A
0.070%
26‐May‐17
5‐Jun‐17
10‐Jun‐17
11‐Jul‐17
1‐Aug‐17
11‐Aug‐17
31‐Oct‐18
31‐May‐17
6‐Jun‐17
6‐Jun‐17
11‐Jul‐17
15‐Jul‐17
20‐Jul‐17
22‐Jul‐19
31‐May‐17
6‐Jun‐17
6‐Jun‐17
11‐Jul‐17
15‐Jul‐17
20‐Jul‐17
95%
95%
0%
0.067%
0.067%
201
8
PIPING
3963‐DGEN‐5‐15‐0004
OT
DUKHAN FIELD; MATERIAL REQUISITION FOR PIPING SPECIALTY ITEMS (STRAINERS, SAMPLING, CORROSIO
1
A
0.070%
29‐May‐17
8‐Jun‐17
13‐Jun‐17
14‐Jul‐17
4‐Aug‐17
14‐Aug‐17
31‐Oct‐18
31‐May‐17
30‐Jul‐17
31‐Jul‐17
2‐Oct‐17
18‐Oct‐17
19‐Oct‐17
22‐Jul‐19
31‐May‐17
30‐Jul‐17
31‐Jul‐17
2‐Oct‐17
18‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.067%
0.067%
202
8
PIPING
3963‐DGEN‐5‐17‐0001
OT
DUKHAN FIELD; TECHNICAL BID EVALUATION FOR MANUAL VALVES (GATE, GLOBE & CHECK)
1
A
0.252%
17‐Jul‐17
27‐Jul‐17
1‐Aug‐17
18‐Aug‐17
28‐Aug‐17
6‐Sep‐17
31‐Oct‐18
20‐Jul‐17
24‐Oct‐17
26‐Oct‐17
19‐Nov‐17
28‐Nov‐17
28‐Nov‐17
22‐Jul‐19
20‐Jul‐17
24‐Oct‐17
26‐Oct‐17
19‐Nov‐17
28‐Nov‐17
28‐Nov‐17
95%
95%
0%
0.240%
0.240%
203
8
PIPING
3963‐DGEN‐5‐17‐0003
OT
DUKHAN FIELD; TECHNICAL BID EVALUATION FOR BALL VALVES
1
A
0.224%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
24‐Oct‐17
26‐Oct‐17
21‐Nov‐17
5‐Dec‐17
5‐Dec‐17
22‐Jul‐19
27‐Jul‐17
24‐Oct‐17
26‐Oct‐17
21‐Nov‐17
5‐Dec‐17
5‐Dec‐17
95%
95%
0%
0.213%
0.213%
A
0.224%
23‐Nov‐17
23‐Nov‐17
8
PIPING
3963‐DGEN‐5‐14‐0004
OT
OT
OT
DUKHAN FIELD; TECHNICAL SPECIFICATION FOR PIPES
0.084%
5‐Apr‐17
15‐Apr‐17
20‐Apr‐17
0.079%
191
204
8
0.079%
0.040%
188 189
0%
0.040%
0.040%
DEM
95%
0%
0.040%
DEM
95%
95%
0%
DEM‐3963‐KAHS‐6‐51‐0002
22‐Jul‐19
4‐May‐17
95%
DEM‐3963‐JALM‐6‐51‐0001
31‐Oct‐18
29‐Nov‐17
95%
PROCESS
15‐Jul‐17
4‐May‐17
29‐Nov‐17
PROCESS
5‐Jul‐17
31‐Oct‐18
22‐Jun‐17
7
14‐Jun‐17
9‐Jul‐17
22‐Jun‐17
7
DEM
0.042%
10‐May‐17
184
7
A
9‐May‐17
0.053%
185 186
1
29‐Nov‐17
0.053%
0.066%
7
22‐Jun‐17
0%
0.066%
172
22‐Jun‐17
95%
0%
174
10‐May‐17
95%
95%
173
9‐May‐17
14‐Jan‐18
24‐Jan‐18
0.079%
PROCESS
14‐Jan‐18
24‐Jan‐18
0.079%
7
13‐Jun‐17
15‐Jun‐17
0%
7
LINE DESIGNATION TABLE ‐ KHATIYAH NORTH DEGASSING STATION
1
95%
170
OT
LINE DESIGNATION TABLE ‐ FAHAHIL NORTH DEGASSING STATION
95%
171
3963‐KAHN‐6‐33‐0001
OT
31‐Oct‐18
26‐Sep‐17
168
166
15‐Jul‐17
14‐May‐17
3‐May‐17
165
5‐Jul‐17
4‐May‐17
22‐Jun‐17
0.106%
10‐Jun‐17
1‐Jul‐17
11‐Jul‐17
31‐Oct‐18
22‐Jul‐17
22‐Jul‐19
22‐Jul‐17
PIPING
3963‐DGEN‐5‐17‐0004
DUKHAN FIELD; TECHNICAL BID EVALUATION FOR PIPING SPECIALTY ITEMS (STRAINERS, SAMPLING, CORR
1
10‐Aug‐17
20‐Aug‐17
25‐Aug‐17
12‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
21‐Oct‐17
23‐Oct‐17
3‐Dec‐17
22‐Jul‐19
19‐Oct‐17
21‐Oct‐17
23‐Oct‐17
205
8
PIPING
3963‐DGEN‐5‐36‐0001
ET
DUKHAN FIELD; EARLY TIE‐IN PACKAGE
1
C
0.070%
5‐Mar‐17
10‐Mar‐17
14‐Mar‐17
14‐Apr‐17
5‐May‐17
15‐May‐17
31‐Oct‐18
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
15‐Jun‐17
12‐Jul‐17
13‐Jul‐17
22‐Jul‐19
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
15‐Jun‐17
12‐Jul‐17
13‐Jul‐17
95%
95%
0%
0.067%
0.067%
206
8
PIPING
3963‐FAHN‐5‐33‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; CRITICAL LINE LIST
1
A
0.042%
16‐Jun‐17
26‐Jun‐17
1‐Jul‐17
1‐Aug‐17
22‐Aug‐17
1‐Sep‐17
31‐Oct‐18
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
20‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
20‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.040%
0.040%
1
A
0.028%
16‐Aug‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
18‐Aug‐17
95%
0.027%
Y
7‐Dec‐17
23‐Jul‐17
7‐Dec‐17
3‐Dec‐17
95%
95%
0%
0.213%
0.080%
0.213%
207
8
PIPING
3963‐FAHN‐5‐32‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
31‐Oct‐18
1‐Jun‐17
30‐Jul‐17
31‐Jul‐17
22‐Jul‐19
1‐Jun‐17
30‐Jul‐17
31‐Jul‐17
27‐Aug‐17
29‐Aug‐17
95%
0%
0.027%
208
8
PIPING
3963‐FAHN‐5‐21‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE
3
0
0.168%
15‐Aug‐17
25‐Aug‐17
30‐Aug‐17
13‐Sep‐17
18‐Sep‐17
18‐Sep‐17
31‐Oct‐18
19‐Oct‐17
12‐Mar‐18
14‐Mar‐18
8‐Sep‐18
2‐Dec‐18
2‐Dec‐18
22‐Jul‐19
19‐Oct‐17
12‐Mar‐18
14‐Mar‐18
8‐Sep‐18
65%
65%
0%
0.109%
209
8
PIPING
3963‐FAHN‐5‐31‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS
3
A
0.280%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
22‐Jul‐19
1‐Jun‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
95%
95%
0%
0.266%
0.266%
210
8
PIPING
3963‐FAHN‐5‐17‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT
3
A
0.420%
16‐Jun‐17
26‐Jun‐17
1‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Jul‐17
31‐Oct‐18
21‐Jun‐17
25‐Sep‐17
27‐Sep‐17
16‐Oct‐17
29‐Oct‐17
7‐Feb‐18
22‐Jul‐19
21‐Jun‐17
25‐Sep‐17
27‐Sep‐17
16‐Oct‐17
29‐Oct‐17
7‐Feb‐18
95%
95%
0%
0.399%
0.399%
211
8
PIPING
3963‐FAHN‐5‐52‐0003
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.3 PIPING GA EL.21.600 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
8‐Dec‐17
10‐Dec‐17
12‐Feb‐18
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
19‐Oct‐17
8‐Dec‐17
10‐Dec‐17
12‐Feb‐18
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.093%
0.093%
212
8
PIPING
3963‐FAHN‐5‐52‐0004
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.4 PIPING GA EL.21.600 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.093%
0.093%
213
8
PIPING
3963‐FAHN‐5‐52‐0005
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.5 PIPING GA EL.21.600 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.093%
0.093%
214
8
PIPING
3963‐FAHN‐5‐52‐0006
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.6 PIPING GA EL.22.620 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.093%
0.093%
215
8
PIPING
3963‐FAHN‐5‐52‐0007
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.7 PIPING GA EL.22.620 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
11‐Feb‐18
11‐Feb‐18
22‐Jul‐19
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
11‐Feb‐18
11‐Feb‐18
95%
95%
0%
0.093%
0.093%
216
8
PIPING
3963‐FAHN‐5‐52‐0008
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.8 PIPING GA EL.22.620 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
11‐Feb‐18
11‐Feb‐18
22‐Jul‐19
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
11‐Feb‐18
11‐Feb‐18
95%
95%
0%
0.093%
0.093%
217
8
PIPING
3963‐FAHN‐5‐52‐0009
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.9 PIPING GA EL.22.620 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
11‐Feb‐18
11‐Feb‐18
22‐Jul‐19
19‐Oct‐17
30‐Oct‐17
31‐Oct‐17
15‐Nov‐17
11‐Feb‐18
11‐Feb‐18
95%
95%
0%
0.093%
0.093%
218
8
PIPING
3963‐FAHN‐5‐52‐0010
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.10 PIPING GA EL.22.620 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
1‐Nov‐17
20‐Nov‐17
11‐Feb‐18
11‐Feb‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
1‐Nov‐17
20‐Nov‐17
11‐Feb‐18
11‐Feb‐18
95%
95%
0%
0.093%
0.093%
219
8
PIPING
3963‐FAHN‐5‐52‐0011
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.11 PIPING GA EL.22.620 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
1‐Nov‐17
16‐Nov‐17
16‐Nov‐17
20‐Nov‐17
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
1‐Nov‐17
16‐Nov‐17
16‐Nov‐17
20‐Nov‐17
95%
95%
0%
0.093%
220
8
PIPING
3963‐FAHS‐5‐33‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; CRITICAL LINE LIST
1
B
0.042%
16‐Jun‐17
26‐Jun‐17
1‐Jul‐17
1‐Aug‐17
22‐Aug‐17
1‐Sep‐17
31‐Oct‐18
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
23‐Aug‐17
13‐Sep‐17
14‐Sep‐17
22‐Jul‐19
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
23‐Aug‐17
13‐Sep‐17
14‐Sep‐17
95%
95%
0%
0.040%
0.040%
221
8
PIPING
3963‐FAHS‐5‐32‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST
1
A
0.028%
28‐May‐17
7‐Jun‐17
12‐Jun‐17
13‐Jul‐17
3‐Aug‐17
13‐Aug‐17
31‐Oct‐18
1‐Jun‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
1‐Jun‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.027%
0.027%
222
8
PIPING
3963‐FAHS‐5‐36‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING TIE‐IN SCHEDULE
1
A
0.056%
24‐Jul‐17
3‐Aug‐17
8‐Aug‐17
26‐Aug‐17
5‐Sep‐17
15‐Sep‐17
31‐Oct‐18
16‐Jul‐17
17‐Jul‐17
18‐Jul‐17
14‐Nov‐17
28‐Nov‐17
28‐Nov‐17
22‐Jul‐19
16‐Jul‐17
17‐Jul‐17
18‐Jul‐17
14‐Nov‐17
28‐Nov‐17
28‐Nov‐17
95%
95%
0%
0.053%
0.053%
0.168%
8‐Sep‐17
31‐Oct‐18
22‐Jul‐19
223
8
PIPING
3963‐FAHS‐5‐21‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE
3
A
2‐Dec‐18
2‐Dec‐18
65%
65%
0%
0.109%
0.109%
0.093%
10‐Aug‐17
20‐Aug‐17
25‐Aug‐17
13‐Sep‐17
13‐Sep‐17
19‐Oct‐17
20‐Mar‐18
22‐Mar‐18
30‐Aug‐18
19‐Oct‐17
20‐Mar‐18
22‐Mar‐18
30‐Aug‐18
224
8
PIPING
3963‐FAHS‐5‐31‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS
3
A
0.336%
2‐Jun‐17
12‐Jun‐17
17‐Jun‐17
18‐Jul‐17
8‐Aug‐17
18‐Aug‐17
31‐Oct‐18
7‐Jun‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
22‐Jul‐19
7‐Jun‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
95%
95%
0%
0.319%
0.319%
225
8
PIPING
3963‐FAHS‐5‐17‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT
3
A
0.420%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
24‐Jul‐17
29‐Jul‐17
29‐Jul‐17
31‐Oct‐18
29‐Jun‐17
3‐Oct‐17
5‐Oct‐17
23‐Oct‐17
23‐Oct‐17
14‐Feb‐18
22‐Jul‐19
29‐Jun‐17
3‐Oct‐17
5‐Oct‐17
23‐Oct‐17
23‐Oct‐17
14‐Feb‐18
95%
95%
0%
0.399%
0.399%
0.109%
226
8
PIPING
3963‐FAHS‐5‐50‐0002
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; KEY PLAN
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
26‐Nov‐17
22‐Jul‐19
27‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
26‐Nov‐17
95%
95%
0%
0.040%
0.040%
227
8
PIPING
3963‐FAHS‐5‐52‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.1 EL. 54.364 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
2‐Nov‐17
2‐Nov‐17
2‐Nov‐17
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
2‐Nov‐17
2‐Nov‐17
2‐Nov‐17
95%
95%
0%
0.093%
0.093%
228
8
PIPING
3963‐FAHS‐5‐52‐0002
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.2 EL. 54.364 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
19‐Oct‐17
30‐Oct‐17
1‐Nov‐17
1‐Nov‐17
1‐Nov‐17
20‐Nov‐17
22‐Jul‐19
19‐Oct‐17
30‐Oct‐17
1‐Nov‐17
1‐Nov‐17
1‐Nov‐17
20‐Nov‐17
95%
95%
0%
0.093%
0.093%
229
8
PIPING
3963‐FAHS‐5‐52‐0003
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.3 EL. 54.364 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
2‐Nov‐17
2‐Nov‐17
2‐Nov‐17
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
2‐Nov‐17
2‐Nov‐17
2‐Nov‐17
95%
95%
0%
0.093%
0.093%
230
8
PIPING
3963‐FAHS‐5‐52‐0004
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.4 EL. 54.364 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
18‐Feb‐18
18‐Feb‐18
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
18‐Feb‐18
18‐Feb‐18
95%
95%
0%
0.093%
0.093%
231
8
PIPING
3963‐FAHS‐5‐52‐0005
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.5 EL. 54.700 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
19‐Feb‐18
19‐Feb‐18
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
19‐Feb‐18
19‐Feb‐18
95%
95%
0%
0.093%
0.093%
232
8
PIPING
3963‐FAHS‐5‐52‐0006
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.6 EL. 54.700 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
30‐Oct‐17
30‐Oct‐17
18‐Feb‐18
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
30‐Oct‐17
30‐Oct‐17
18‐Feb‐18
95%
95%
0%
0.093%
0.093%
233
8
PIPING
3963‐FAHS‐5‐52‐0007
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.7 EL. 54.470 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
18‐Feb‐18
18‐Feb‐18
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
18‐Feb‐18
18‐Feb‐18
95%
95%
0%
0.093%
0.093%
234
8
PIPING
3963‐FAHS‐5‐52‐0008
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.8 EL. 54.470 & ABOVE
1
1
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
19‐Oct‐17
15‐Dec‐17
17‐Dec‐17
25‐Feb‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
19‐Oct‐17
15‐Dec‐17
17‐Dec‐17
25‐Feb‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.093%
0.093%
235
8
PIPING
3963‐FAHS‐5‐52‐0009
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.9 EL. 54.470 TO 58.470
1
1
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
19‐Oct‐17
18‐Dec‐17
21‐Dec‐17
18‐Feb‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
19‐Oct‐17
18‐Dec‐17
21‐Dec‐17
18‐Feb‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.093%
0.093%
236
8
PIPING
3963‐FAHS‐5‐52‐0010
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.10 EL. 54.364 & ABOVE
1
1
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
19‐Oct‐17
18‐Dec‐17
20‐Dec‐17
21‐Feb‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
19‐Oct‐17
18‐Dec‐17
20‐Dec‐17
21‐Feb‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.093%
0.093%
237
8
PIPING
3963‐FAHS‐5‐52‐0011
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.11 EL. 54.364 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
25‐Feb‐18
25‐Feb‐18
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
25‐Feb‐18
25‐Feb‐18
95%
95%
0%
0.093%
0.093%
238
8
PIPING
3963‐FAHS‐5‐52‐0012
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.12 EL. 54.364 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
25‐Feb‐18
25‐Feb‐18
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
25‐Feb‐18
25‐Feb‐18
95%
95%
0%
0.093%
0.093%
239
8
PIPING
3963‐FAHS‐5‐52‐0013
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.13 EL. 54.364 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
25‐Feb‐18
25‐Feb‐18
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
25‐Feb‐18
25‐Feb‐18
95%
95%
0%
0.093%
240
8
PIPING
3963‐FAHS‐5‐52‐0014
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING G.A AREA 701,SHT.14 EL. 54.364 & ABOVE
1
A
0.098%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
25‐Feb‐18
25‐Feb‐18
22‐Jul‐19
12‐Oct‐17
15‐Oct‐17
16‐Oct‐17
19‐Nov‐17
25‐Feb‐18
25‐Feb‐18
95%
95%
0%
0.093%
0.093%
241
8
PIPING
3963‐JALM‐5‐33‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; CRITICAL LINE LIST
1
B
0.042%
16‐Jun‐17
26‐Jun‐17
1‐Jul‐17
1‐Aug‐17
22‐Aug‐17
1‐Sep‐17
31‐Oct‐18
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
23‐Aug‐17
13‐Sep‐17
14‐Sep‐17
22‐Jul‐19
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
23‐Aug‐17
13‐Sep‐17
14‐Sep‐17
95%
95%
0%
0.040%
0.040%
242
8
PIPING
3963‐JALM‐5‐32‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST
1
A
0.028%
5‐Jun‐17
15‐Jun‐17
20‐Jun‐17
21‐Jul‐17
11‐Aug‐17
21‐Aug‐17
31‐Oct‐18
7‐Jun‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
7‐Jun‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.027%
0.027%
1
A
28‐Nov‐17
10‐Dec‐17
28‐Nov‐17
95%
13‐Sep‐17
0.093%
243
8
PIPING
3963‐JALM‐5‐36‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING TIE‐IN SCHEDULE
0.056%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
16‐Sep‐17
31‐Oct‐18
4‐Aug‐17
6‐Aug‐17
8‐Aug‐17
10‐Dec‐17
22‐Jul‐19
4‐Aug‐17
6‐Aug‐17
8‐Aug‐17
10‐Dec‐17
10‐Dec‐17
95%
0%
0.053%
0.053%
244
8
PIPING
3963‐JALM‐5‐21‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE
3
A
0.168%
15‐Aug‐17
25‐Aug‐17
30‐Aug‐17
13‐Sep‐17
18‐Sep‐17
18‐Sep‐17
31‐Oct‐18
19‐Oct‐17
20‐Mar‐18
22‐Mar‐18
8‐Sep‐18
2‐Dec‐18
2‐Dec‐18
22‐Jul‐19
19‐Oct‐17
20‐Mar‐18
22‐Mar‐18
8‐Sep‐18
65%
65%
0%
0.109%
0.109%
245
8
PIPING
3963‐JALM‐5‐31‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS
3
A
0.336%
5‐Jun‐17
15‐Jun‐17
20‐Jun‐17
21‐Jul‐17
11‐Aug‐17
21‐Aug‐17
31‐Oct‐18
7‐Jun‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
22‐Jul‐19
7‐Jun‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
95%
95%
0%
0.319%
246
8
PIPING
3963‐JALM‐5‐17‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT
3
A
0.420%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
3‐Aug‐17
8‐Aug‐17
8‐Aug‐17
31‐Oct‐18
3‐Jul‐17
11‐Oct‐17
12‐Oct‐17
2‐Jan‐18
26‐Feb‐18
26‐Feb‐18
22‐Jul‐19
3‐Jul‐17
11‐Oct‐17
12‐Oct‐17
2‐Jan‐18
26‐Feb‐18
26‐Feb‐18
95%
95%
0%
0.399%
0.399%
247
8
PIPING
3963‐JALM‐5‐50‐0002
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; KEY PLAN
1
A
0.042%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
1‐Aug‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
26‐Nov‐17
22‐Jul‐19
1‐Aug‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
26‐Nov‐17
95%
95%
0%
0.040%
0.040%
Page 2 of 13
Page 73 of 170
0.319%
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC NO
ITEM CODE
DOC DESC
DOC CLASS
CURRENT REVISION
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100%
ACTIAFC
ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
WV
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
248
8
PIPING
3963‐JALM‐5‐52‐0003
0.140%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
5‐Jan‐18
7‐Jan‐18
4‐Mar‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
8‐Jul‐17
5‐Jan‐18
7‐Jan‐18
4‐Mar‐18
22‐Mar‐18
22‐Mar‐18
249
8
PIPING
3963‐JALM‐5‐52‐0004
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.4 EL.63.000 & ABOVE
1
1
0.084%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
11‐Jul‐17
26‐Dec‐17
28‐Dec‐17
4‐Mar‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
11‐Jul‐17
26‐Dec‐17
28‐Dec‐17
4‐Mar‐18
22‐Mar‐18
22‐Mar‐18
95%
95%
0%
0.080%
250
8
PIPING
3963‐JALM‐5‐52‐0005
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.5 EL.63.000 & ABOVE
1
1
0.140%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
26‐Dec‐17
28‐Dec‐17
4‐Mar‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
8‐Jul‐17
26‐Dec‐17
28‐Dec‐17
4‐Mar‐18
22‐Mar‐18
22‐Mar‐18
95%
95%
0%
0.133%
0.133%
251
8
PIPING
3963‐JALM‐5‐52‐0006
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.6 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
252
8
PIPING
3963‐JALM‐5‐52‐0007
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.7 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
253
SEQ
ACTS
ACTD
ACTIFC
ACTIFA
ACTIAWH
Plan WF
Actual WF
0.133%
0.133% 0.080%
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.8 EL.63000 & ABOVE
1
A
0.112%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.106%
0.106%
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.9 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
13‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
13‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.10 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
256
8
PIPING
3963‐JALM‐5‐52‐0011
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.11 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
11‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
11‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
257
8
PIPING
3963‐JALM‐5‐52‐0012
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.12 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
258
8
PIPING
3963‐JALM‐5‐52‐0013
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.13 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
13‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
4‐Dec‐17
4‐Dec‐17
22‐Jul‐19
13‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
4‐Dec‐17
4‐Dec‐17
95%
95%
0%
0.067%
0.067%
259
8
PIPING
3963‐JALM‐5‐52‐0014
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.14 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
13‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
13‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
260
8
PIPING
3963‐JALM‐5‐52‐0015
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.15 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
13‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
13‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
261
8
PIPING
3963‐JALM‐5‐52‐0016
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.16 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
262
8
PIPING
3963‐JALM‐5‐52‐0017
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.17 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
263
8
PIPING
3963‐JALM‐5‐52‐0018
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.18 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
264
8
PIPING
3963‐JALM‐5‐52‐0019
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 805, SHT.19 EL.63.000 & ABOVE
1
A
0.070%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
8‐Jul‐17
30‐Oct‐17
31‐Oct‐17
23‐Nov‐17
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.067%
0.067%
265
8
PIPING
3963‐KAHM‐5‐33‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; CRITICAL LINE LIST
1
A
0.042%
22‐Jun‐17
2‐Jul‐17
7‐Jul‐17
7‐Aug‐17
28‐Aug‐17
7‐Sep‐17
31‐Oct‐18
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
20‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
20‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.040%
0.040%
266
8
PIPING
3963‐KAHM‐5‐32‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST
1
A
0.028%
21‐May‐17
31‐May‐17
5‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
25‐May‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
25‐May‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.027%
0.027%
19‐Oct‐17
19‐Oct‐17
15‐Aug‐17
0.168%
5‐Aug‐17
5‐Sep‐17
15‐Sep‐17
15‐Sep‐17
31‐Oct‐18
30‐Mar‐18
1‐Apr‐18
7‐May‐18
27‐May‐18
27‐May‐18
22‐Jul‐19
30‐Mar‐18
1‐Apr‐18
7‐May‐18
27‐May‐18
27‐May‐18
95%
95%
0%
0.160%
0.160%
0.336%
10‐Jun‐17
20‐Jun‐17
25‐Jun‐17
26‐Jul‐17
16‐Aug‐17
26‐Aug‐17
31‐Oct‐18
8‐Jul‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
22‐Jul‐19
8‐Jul‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
95%
95%
0%
0.319%
0.319%
7‐May‐17
11‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
5‐May‐17
7‐May‐17
8‐May‐17
30‐Jul‐17
29‐Jul‐17
30‐Jul‐17
22‐Jul‐19
5‐May‐17
7‐May‐17
8‐May‐17
30‐Jul‐17
29‐Jul‐17
30‐Jul‐17
95%
95%
0%
0.080%
0.080%
10‐Jun‐17
11‐Jul‐17
1‐Aug‐17
11‐Aug‐17
31‐Oct‐18
1‐Jun‐17
15‐Jul‐17
16‐Jul‐17
26‐Oct‐17
26‐Oct‐17
26‐Nov‐17
22‐Jul‐19
1‐Jun‐17
15‐Jul‐17
16‐Jul‐17
26‐Oct‐17
26‐Oct‐17
26‐Nov‐17
95%
95%
0%
0.040%
0.040%
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
29‐Nov‐17
22‐Jul‐19
31‐May‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
29‐Nov‐17
95%
95%
0%
0.057%
0.057%
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
29‐Nov‐17
22‐Jul‐19
31‐May‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
29‐Nov‐17
95%
95%
0%
0.072%
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
2‐Aug‐17
3‐Aug‐17
29‐Oct‐17
29‐Oct‐17
29‐Nov‐17
22‐Jul‐19
31‐May‐17
2‐Aug‐17
3‐Aug‐17
29‐Oct‐17
29‐Oct‐17
29‐Nov‐17
95%
95%
0%
0.086%
0.086%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
28‐Nov‐17
22‐Jul‐19
1‐Jun‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
28‐Nov‐17
95%
95%
0%
0.086%
0.086%
0.075%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
28‐Nov‐17
22‐Jul‐19
1‐Jun‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
28‐Nov‐17
95%
95%
0%
0.072%
0.072%
0.075%
22‐Jul‐19
8
PIPING
3963‐KAHM‐5‐31‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS
3
A
8
PIPING
3963‐KAHM‐5‐31‐0002
ET
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS (EARLY T
3
A
270
8
PIPING
3963‐KAHM‐5‐50‐0002
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; KEY PLAN
1
A
0.042%
26‐May‐17
5‐Jun‐17
271
8
PIPING
3963‐KAHM‐5‐52‐0002
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.2 EL. 99.143 & ABOVE
1
A
0.060%
31‐May‐17
10‐Jun‐17
272
8
PIPING
3963‐KAHM‐5‐52‐0004
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.4 EL. 99.143 & ABOVE
1
A
0.075%
31‐May‐17
10‐Jun‐17
273
8
PIPING
3963‐KAHM‐5‐52‐0006
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.6 EL. 98.973 & ABOVE
1
A
0.090%
31‐May‐17
274
8
PIPING
3963‐KAHM‐5‐52‐0007
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA‐255 SHT.7 EL.99.743 & ABOVE
1
A
0.090%
275
8
PIPING
3963‐KAHM‐5‐52‐0010
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.10 EL. 99.443 & ABOVE
1
A
20‐Aug‐17
0.067%
0.084%
268 269
Y
28‐Feb‐18
PLASBUILT
3963‐JALM‐5‐52‐0009
A
28‐Feb‐18
PLIAFC
3963‐JALM‐5‐52‐0010
3
23‐Nov‐17
PLIAWH
PIPING
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE
31‐Oct‐17
PLIFA
PIPING
OT
30‐Oct‐17
PLIFC
8
3963‐KAHM‐5‐21‐0001
OT
PLD
8
PIPING
3963‐JALM‐5‐52‐0008
PLS
254
8
PIPING
DOC NO
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
255
267
8
DISCIPLINE
CURRENT REVISION 1
Original BL WV
ITEM DOC DESC CODE OT DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.3 EL.63.000 & ABOVE
SRN
DOC CLASS 1
SHUTD OWN PACKA GE SHUTD OWN
276
8
PIPING
3963‐KAHM‐5‐52‐0011
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A. AREA‐255, SHT.11 EL.99.9943 & ABOV
1
A
31‐May‐17
10‐Jun‐17
15‐Jun‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
28‐Dec‐17
31‐May‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
28‐Dec‐17
277
8
PIPING
3963‐KAHM‐5‐71‐0002
ET
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE‐IN
3
A
0.132%
6‐Jul‐17
16‐Jul‐17
20‐Jul‐17
30‐Jul‐17
9‐Aug‐17
19‐Aug‐17
31‐Oct‐18
18‐Jul‐17
19‐Jul‐17
20‐Jul‐17
7‐Sep‐17
7‐Sep‐17
30‐Nov‐17
22‐Jul‐19
18‐Jul‐17
19‐Jul‐17
20‐Jul‐17
7‐Sep‐17
7‐Sep‐17
30‐Nov‐17
95%
95%
0%
0.126%
0.126%
278
8
PIPING
3963‐KAHN‐5‐33‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; CRITICAL LINE LIST
1
A
0.042%
22‐Jun‐17
2‐Jul‐17
7‐Jul‐17
7‐Aug‐17
28‐Aug‐17
7‐Sep‐17
31‐Oct‐18
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
20‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
21‐Jun‐17
19‐Jul‐17
20‐Jul‐17
20‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.040%
0.040%
279
8
PIPING
3963‐KAHN‐5‐32‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST
1
A
0.028%
26‐May‐17
5‐Jun‐17
10‐Jun‐17
11‐Jul‐17
1‐Aug‐17
11‐Aug‐17
31‐Oct‐18
31‐May‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
31‐May‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.027%
0.027%
280
8
PIPING
3963‐KAHN‐5‐21‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE
19‐Oct‐17
19‐Oct‐17
281
8
PIPING
3963‐KAHN‐5‐31‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS
3
A
282
8
PIPING
3963‐KAHN‐5‐31‐0002
ET
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS (EARLY
3
A
283
8
PIPING
3963‐KAHN‐5‐50‐0002
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; KEY PLAN
1
284
8
PIPING
3963‐KAHN‐5‐52‐0006
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.6 EL.103.590 & ABOVE
1
285
8
PIPING
3963‐KAHN‐5‐52‐0008
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.8 EL.103.590 & ABOVE
286
8
PIPING
3963‐KAHN‐5‐52‐0009
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.9 EL.103.590 & ABOVE
287
8
PIPING
3963‐KAHN‐5‐52‐0011
OT
288
8
PIPING
3963‐KAHN‐5‐52‐0012
OT
PIPING
3963‐KAHN‐5‐71‐0002
289
8
ET
3
Y
A
26‐Oct‐17
95%
95%
0%
0.072%
0.072%
0.224%
8‐Aug‐17
6‐Sep‐17
11‐Sep‐17
11‐Sep‐17
31‐Oct‐18
30‐Mar‐18
1‐Apr‐18
5‐May‐18
31‐May‐18
31‐May‐18
22‐Jul‐19
30‐Mar‐18
1‐Apr‐18
5‐May‐18
31‐May‐18
31‐May‐18
95%
95%
0%
0.213%
0.213%
0.336%
12‐Jun‐17
22‐Jun‐17
27‐Jun‐17
28‐Jul‐17
18‐Aug‐17
28‐Aug‐17
31‐Oct‐18
11‐Jul‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
22‐Jul‐19
11‐Jul‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
95%
95%
0%
0.319%
0.319%
7‐May‐17
11‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
5‐May‐17
7‐May‐17
8‐May‐17
18‐Jul‐17
7‐Sep‐17
7‐Sep‐17
22‐Jul‐19
5‐May‐17
7‐May‐17
8‐May‐17
18‐Jul‐17
7‐Sep‐17
7‐Sep‐17
95%
95%
0%
0.080%
0.080%
A
0.042%
30‐Jun‐17
10‐Jul‐17
15‐Jul‐17
15‐Aug‐17
5‐Sep‐17
15‐Sep‐17
31‐Oct‐18
6‐Jul‐17
15‐Jul‐17
16‐Jul‐17
26‐Oct‐17
26‐Oct‐17
28‐Nov‐17
22‐Jul‐19
6‐Jul‐17
15‐Jul‐17
16‐Jul‐17
26‐Oct‐17
26‐Oct‐17
28‐Nov‐17
95%
95%
0%
0.040%
0.040%
A
0.070%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
19‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.067%
0.067%
1
B
0.070%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
20‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.067%
1
A
0.070%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
20‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.067%
0.067%
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.11 EL.103.590 & ABOV
1
A
0.070%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
15‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.067%
0.067%
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.12 EL.103.590 & ABOV
1
A
0.070%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
15‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.067%
0.067%
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE‐IN
3
A
6‐Jul‐17
16‐Jul‐17
20‐Jul‐17
30‐Jul‐17
9‐Aug‐17
19‐Aug‐17
31‐Oct‐18
7‐Sep‐17
30‐Nov‐17
18‐Jul‐17
19‐Jul‐17
20‐Jul‐17
7‐Sep‐17
30‐Nov‐17
18‐Jul‐17
19‐Jul‐17
20‐Jul‐17
290
8
PIPING
3963‐KAHS‐5‐33‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; CRITICAL LINE LIST
1
A
0.042%
23‐May‐17
2‐Jun‐17
7‐Jun‐17
8‐Jul‐17
29‐Jul‐17
8‐Aug‐17
31‐Oct‐18
25‐May‐17
19‐Jul‐17
20‐Jul‐17
20‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
25‐May‐17
19‐Jul‐17
20‐Jul‐17
20‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.040%
0.040%
8
PIPING
3963‐KAHS‐5‐32‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING SPECIALTY ITEM LIST
1
A
0.028%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
25‐May‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.027%
0.027%
19‐Oct‐17
19‐Oct‐17
292
8
PIPING
3963‐KAHS‐5‐21‐0001
OT
8
PIPING
3963‐KAHS‐5‐31‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS
3
A
294
8
PIPING
3963‐KAHS‐5‐31‐0002
ET
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS (EARLY
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE
3
3
A
A
295
8
PIPING
3963‐KAHS‐5‐50‐0002
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; KEY PLAN
1
296
8
PIPING
3963‐KAHS‐5‐52‐0004
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.4 EL.26.000 TO 28.600
1
297
8
PIPING
3963‐KAHS‐5‐52‐0005
OT
0.112%
25‐Aug‐17
22‐Jul‐19
7‐Sep‐17
95%
95%
0%
0.106%
0.106%
0.280%
10‐Aug‐17
8‐Sep‐17
13‐Sep‐17
13‐Sep‐17
31‐Oct‐18
6‐Apr‐18
8‐Apr‐18
7‐May‐18
31‐May‐18
31‐May‐18
22‐Jul‐19
6‐Apr‐18
8‐Apr‐18
7‐May‐18
31‐May‐18
31‐May‐18
95%
95%
0%
0.266%
0.266%
0.336%
15‐Jun‐17
25‐Jun‐17
30‐Jun‐17
31‐Jul‐17
21‐Aug‐17
31‐Aug‐17
31‐Oct‐18
8‐Jul‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
22‐Jul‐19
8‐Jul‐17
6‐Nov‐17
13‐Nov‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
95%
95%
0%
0.319%
0.319%
0.084%
7‐May‐17
11‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
5‐May‐17
7‐May‐17
8‐May‐17
18‐Jul‐17
7‐Sep‐17
7‐Sep‐17
22‐Jul‐19
5‐May‐17
7‐May‐17
8‐May‐17
18‐Jul‐17
7‐Sep‐17
7‐Sep‐17
95%
95%
0%
0.080%
0.080%
A
0.042%
20‐Jun‐17
30‐Jun‐17
5‐Jul‐17
5‐Aug‐17
26‐Aug‐17
5‐Sep‐17
31‐Oct‐18
22‐Jun‐17
15‐Jul‐17
16‐Jul‐17
26‐Oct‐17
26‐Oct‐17
28‐Nov‐17
22‐Jul‐19
22‐Jun‐17
15‐Jul‐17
16‐Jul‐17
26‐Oct‐17
26‐Oct‐17
28‐Nov‐17
95%
95%
0%
0.040%
0.040%
A
0.084%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
29‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
29‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.080%
0.080%
Y
20‐Aug‐17
7‐Sep‐17
0.067%
291 293
Y
23‐Aug‐17
26‐Oct‐17
0.084%
Y
18‐Aug‐17
16‐Jul‐17
0.072%
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.5 EL.28.600 & ABOVE
1
A
0.070%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.067%
0.067%
298
8
PIPING
3963‐KAHS‐5‐52‐0006
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.6 EL.26.000 TO 28.600
1
A
0.070%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.067%
0.067%
299
8
PIPING
3963‐KAHS‐5‐52‐0007
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.7 EL.26.000 TO 28.600
1
A
0.070%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.067%
0.067%
300
8
PIPING
3963‐KAHS‐5‐52‐0008
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.8 EL.26.000 TO 28.600
1
A
0.070%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.067%
0.067%
301
8
PIPING
3963‐KAHS‐5‐52‐0009
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.9 EL.26.000 & ABOVE
1
A
0.070%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
28‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.067%
0.067%
302
8
PIPING
3963‐KAHS‐5‐52‐0010
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.10 EL.26.000 & ABOVE
1
A
0.070%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
29‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
29‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.067%
0.067%
303
8
PIPING
3963‐KAHS‐5‐52‐0011
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.11 EL.26.000 & ABOVE
1
A
0.070%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
29‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
29‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.067%
304
8
PIPING
3963‐KAHS‐5‐52‐0012
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.12 EL.26.000 & ABOVE
1
A
0.070%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
29‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
22‐Jul‐19
29‐Jun‐17
21‐Oct‐17
23‐Oct‐17
7‐Nov‐17
7‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.067%
0.067%
305
8
PIPING
3963‐KAHS‐5‐71‐0002
ET
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING ISOMETRICS FOR EARLY TIE‐IN
3
A
0.132%
6‐Jul‐17
16‐Jul‐17
20‐Jul‐17
30‐Jul‐17
9‐Aug‐17
19‐Aug‐17
31‐Oct‐18
18‐Jul‐17
19‐Jul‐17
20‐Jul‐17
20‐Jul‐17
20‐Jul‐17
30‐Nov‐17
22‐Jul‐19
18‐Jul‐17
19‐Jul‐17
20‐Jul‐17
20‐Jul‐17
20‐Jul‐17
30‐Nov‐17
95%
95%
0%
0.126%
0.126%
306
8
PIPING
3963‐FAHM‐5‐33‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; CRITICAL LINE LIST
1
B
0.028%
16‐Jun‐17
26‐Jun‐17
1‐Jul‐17
1‐Aug‐17
22‐Aug‐17
1‐Sep‐17
31‐Oct‐18
22‐Jun‐17
19‐Jul‐17
20‐Jul‐17
23‐Aug‐17
13‐Sep‐17
14‐Sep‐17
22‐Jul‐19
22‐Jun‐17
19‐Jul‐17
20‐Jul‐17
23‐Aug‐17
13‐Sep‐17
14‐Sep‐17
95%
95%
0%
0.027%
27‐Aug‐17
29‐Aug‐17
Y
307
8
PIPING
3963‐FAHM‐5‐32‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING SPECIALTY ITEM LIST
1
A
0.028%
30‐Jul‐17
9‐Aug‐17
14‐Aug‐17
1‐Sep‐17
11‐Sep‐17
21‐Sep‐17
31‐Oct‐18
29‐Jul‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
29‐Jul‐17
30‐Jul‐17
31‐Jul‐17
18‐Aug‐17
308
8
PIPING
3963‐FAHM‐5‐21‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; TIE‐IN ENGINEERING PACKAGE
3
A
0.280%
15‐Aug‐17
25‐Aug‐17
30‐Aug‐17
13‐Sep‐17
18‐Sep‐17
18‐Sep‐17
31‐Oct‐18
19‐Oct‐17
20‐Mar‐18
13‐Aug‐18
30‐Aug‐18
2‐Dec‐18
2‐Dec‐18
22‐Jul‐19
19‐Oct‐17
20‐Mar‐18
13‐Aug‐18
30‐Aug‐18
26‐Jun‐17
13‐Nov‐17
13‐Nov‐17
309
3
A
0.336%
16‐Jun‐17
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
22‐Jul‐19
21‐Dec‐17
10‐Jan‐18
10‐Jan‐18
95%
95%
0%
0.319%
0.319%
PIPING
3963‐FAHM‐5‐17‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT
3
A
0.420%
30‐Jun‐17
10‐Jul‐17
15‐Jul‐17
29‐Jul‐17
3‐Aug‐17
3‐Aug‐17
31‐Oct‐18
3‐Jul‐17
19‐Sep‐17
20‐Sep‐17
9‐Oct‐17
25‐Oct‐17
29‐Jan‐18
22‐Jul‐19
3‐Jul‐17
19‐Sep‐17
20‐Sep‐17
9‐Oct‐17
25‐Oct‐17
29‐Jan‐18
95%
95%
0%
0.399%
0.399%
3963‐FAHM‐5‐52‐0003
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.3 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
28‐Nov‐17
30‐Nov‐17
1‐Feb‐18
4‐Mar‐18
4‐Mar‐18
22‐Jul‐19
19‐Oct‐17
28‐Nov‐17
30‐Nov‐17
1‐Feb‐18
4‐Mar‐18
4‐Mar‐18
95%
95%
0%
0.093%
0.093%
22‐Jun‐17
6‐Nov‐17
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.4 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
6‐Nov‐17
8‐Nov‐17
31‐Jan‐18
4‐Mar‐18
4‐Mar‐18
22‐Jul‐19
19‐Oct‐17
3963‐FAHM‐5‐52‐0005
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.5 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
6‐Nov‐17
8‐Nov‐17
31‐Jan‐18
4‐Mar‐18
4‐Mar‐18
22‐Jul‐19
19‐Oct‐17
6‐Nov‐17
8‐Nov‐17
31‐Jan‐18
4‐Mar‐18
4‐Mar‐18
95%
95%
0%
0.093%
0.093%
3963‐FAHM‐5‐52‐0006
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.6 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
6‐Nov‐17
8‐Nov‐17
31‐Jan‐18
4‐Mar‐18
4‐Mar‐18
22‐Jul‐19
19‐Oct‐17
6‐Nov‐17
8‐Nov‐17
31‐Jan‐18
4‐Mar‐18
4‐Mar‐18
95%
95%
0%
0.093%
0.093%
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
6‐Nov‐17
PIPING
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.7 EL.60.000 & ABOVE
31‐Oct‐18
22‐Jun‐17
PIPING
OT
20‐Sep‐17
31‐Oct‐18
8
3963‐FAHM‐5‐52‐0007
10‐Sep‐17
20‐Jul‐17
8
PIPING
31‐Aug‐17
20‐Jul‐17
313
8
13‐Aug‐17
15‐Jul‐17
314 315
8‐Aug‐17
1‐Jul‐17
0.027% 0.182%
PIPING
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; MATERIAL TAKE OFF ‐ PIPING BULK ITEMS
0.027% 0.182%
8
3963‐FAHM‐5‐52‐0004
OT
0% 0%
8
PIPING
3963‐FAHM‐5‐31‐0001
95% 65%
310
8
PIPING
0.027%
95% 65%
311 312
8
0.067%
19‐Oct‐17
6‐Nov‐17
8‐Nov‐17
4‐Mar‐18
22‐Jul‐19
19‐Oct‐17
6‐Nov‐17
6‐Nov‐17
8‐Nov‐17
8‐Nov‐17
31‐Jan‐18
4‐Mar‐18
4‐Mar‐18
4‐Mar‐18
95%
95%
95%
95%
0%
0%
0.093%
0.093%
0.093%
4‐Feb‐18
4‐Mar‐18
4‐Feb‐18
4‐Mar‐18
316
8
PIPING
3963‐FAHM‐5‐52‐0008
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.8 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
12‐Nov‐17
12‐Nov‐17
11‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
12‐Nov‐17
12‐Nov‐17
11‐Jan‐18
95%
95%
0%
0.093%
0.093%
317
8
PIPING
3963‐FAHM‐5‐52‐0009
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.9 EL.60.600 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.093%
0.093%
0.093%
318
8
PIPING
3963‐FAHM‐5‐52‐0010
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.10 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
95%
95%
0%
0.093%
0.093%
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
319
8
PIPING
3963‐FAHM‐5‐52‐0011
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.11 EL.60.700 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.093%
320
8
PIPING
3963‐FAHM‐5‐52‐0012
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐655 SHT.12 EL.60.450 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.093%
0.093%
321
8
PIPING
3963‐FAHM‐5‐52‐0013
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐655 SHT.13 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.093%
0.093%
322
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐655 SHT.14 EL.60.000 & ABOVE
1
0.098%
29‐Jul‐17
323
8
PIPING
3963‐FAHM‐5‐52‐0015
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐655 SHT.15 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.093%
0.093%
324
8
PIPING
3963‐FAHM‐5‐52‐0016
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.16 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.093%
0.093%
31‐Oct‐18
19‐Oct‐17
325
8
8
PIPING
PIPING
3963‐FAHM‐5‐52‐0014
3963‐FAHM‐5‐52‐0017
OT
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.17 EL.60.000 & ABOVE
1
B
B
0.098%
29‐Jul‐17
8‐Aug‐17
8‐Aug‐17
13‐Aug‐17
13‐Aug‐17
31‐Aug‐17
31‐Aug‐17
10‐Sep‐17
10‐Sep‐17
20‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
31‐Oct‐17
2‐Nov‐17
2‐Nov‐17
23‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
22‐Jul‐19
19‐Oct‐17
19‐Oct‐17
31‐Oct‐17
31‐Oct‐17
2‐Nov‐17
2‐Nov‐17
23‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
95%
95%
0%
0%
0.093%
0.093%
0.093%
0.093%
0.093%
326
8
PIPING
3963‐FAHM‐5‐52‐0018
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.18 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.093%
0.093%
327
8
PIPING
3963‐FAHM‐5‐52‐0019
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.19 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.093%
0.093%
3963‐FAHM‐5‐52‐0020
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.20 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
329
8
PIPING
3963‐FAHM‐5‐52‐0021
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA‐ 655 SHT.21 EL.60.000 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
2‐Nov‐17
23‐Nov‐17
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.093%
0.093%
330
328
8
8
PIPING
PIPING
DEM‐3963‐FAHM‐5‐50‐0001
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PLOT PLAN
1
A
0.056%
22‐May‐17
1‐Jun‐17
6‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
31‐Oct‐18
25‐May‐17
25‐Jul‐17
26‐Jul‐17
24‐Aug‐17
14‐Sep‐17
29‐Jan‐18
18‐Oct‐17
22‐Jul‐19
25‐May‐17
25‐Jul‐17
26‐Jul‐17
24‐Aug‐17
14‐Sep‐17
29‐Jan‐18
18‐Oct‐17
29‐Jan‐18
95%
95%
95%
95%
0%
0%
0.053%
0.093%
0.053%
0.093%
331
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0001
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.1 EL.60.000 & ABOVE (DEM
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
95%
95%
0%
0.027%
0.027%
332
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0002
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.2 EL.60.000 & ABOVE (DEM
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
22‐Jul‐19
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
95%
95%
0%
0.040%
0.040%
333
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0003
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.3 EL.60.000 & ABOVE (DEM
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
22‐Jul‐19
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
95%
95%
0%
0.040%
0.040%
334
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0004
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.4 EL.60.000 & ABOVE (DEM
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
22‐Jul‐19
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
95%
95%
0%
0.027%
0.027%
335
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0005
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.5 EL.60.000 & ABOVE (DEM
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
24‐Aug‐17
14‐Sep‐17
17‐Oct‐17
95%
95%
0%
0.027%
336
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0006
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.6 EL.60.000 & ABOVE (DEM
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
17‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
17‐Oct‐17
95%
95%
0%
0.027%
0.027%
337
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0007
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.7 EL.60.000 & ABOVE (DEM
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
11‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
17‐Oct‐17
22‐Jul‐19
11‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
17‐Oct‐17
95%
95%
0%
0.027%
0.027%
338
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0008
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.8 EL.60.000 & ABOVE (DEM
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
339
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0009
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.9 EL.60.700 & ABOVE (DEM
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
18‐Oct‐17
95%
95%
0%
0.027%
340
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0010
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.10 EL.60.450 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
341
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0011
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.11 EL.60.000 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
11‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
18‐Oct‐17
22‐Jul‐19
11‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Aug‐17
5‐Oct‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
342
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0012
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.12 EL.60.000 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
29‐Aug‐17
17‐Oct‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
29‐Aug‐17
17‐Oct‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
0.027%
0.027%
343
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0013
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.13 EL.60.000 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
6‐Aug‐17
8‐Aug‐17
31‐Aug‐17
20‐Sep‐17
18‐Oct‐17
22‐Jul‐19
13‐Jul‐17
6‐Aug‐17
8‐Aug‐17
31‐Aug‐17
20‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
344
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0014
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.14 EL.60.000 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
6‐Aug‐17
8‐Aug‐17
31‐Aug‐17
20‐Sep‐17
18‐Oct‐17
22‐Jul‐19
13‐Jul‐17
6‐Aug‐17
8‐Aug‐17
31‐Aug‐17
20‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
345
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0015
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.15 EL.60.000 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
20‐Sep‐17
18‐Oct‐17
22‐Jul‐19
13‐Jul‐17
6‐Aug‐17
8‐Aug‐17
31‐Aug‐17
20‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
346
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0016
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.16 EL.60.000 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
6‐Aug‐17
8‐Aug‐17
29‐Aug‐17
17‐Oct‐17
18‐Oct‐17
22‐Jul‐19
13‐Jul‐17
6‐Aug‐17
8‐Aug‐17
29‐Aug‐17
17‐Oct‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
347
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0017
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.17 EL.60.200 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
6‐Aug‐17
8‐Aug‐17
29‐Aug‐17
17‐Oct‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
6‐Aug‐17
8‐Aug‐17
29‐Aug‐17
17‐Oct‐17
18‐Oct‐17
95%
95%
0%
0.027%
0.027%
348
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0018
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.18 EL.60.000 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
10‐Sep‐17
11‐Sep‐17
26‐Sep‐17
26‐Sep‐17
26‐Sep‐17
22‐Jul‐19
8‐Jul‐17
10‐Sep‐17
11‐Sep‐17
26‐Sep‐17
26‐Sep‐17
26‐Sep‐17
95%
95%
0%
0.027%
0.027%
349
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0019
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.19 EL.60.000 & ABOVE (DE
1
A
0.028%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
10‐Sep‐17
11‐Sep‐17
26‐Sep‐17
26‐Sep‐17
26‐Sep‐17
22‐Jul‐19
8‐Jul‐17
10‐Sep‐17
11‐Sep‐17
26‐Sep‐17
26‐Sep‐17
26‐Sep‐17
95%
95%
0%
0.027%
0.027%
350
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0020
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.23 EL.60.000 & ABOVE (DE
1
A
0.056%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
20‐Oct‐17
22‐Oct‐17
24‐Oct‐17
13‐Nov‐17
13‐Nov‐17
13‐Nov‐17
22‐Jul‐19
20‐Oct‐17
22‐Oct‐17
24‐Oct‐17
13‐Nov‐17
13‐Nov‐17
13‐Nov‐17
95%
95%
0%
0.053%
351
8
PIPING
DEM‐3963‐FAHM‐5‐52‐0021
DEM
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.25 EL.60.000 & ABOVE (DE
1
A
0.056%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
20‐Oct‐17
22‐Oct‐17
24‐Oct‐17
13‐Nov‐17
13‐Nov‐17
13‐Nov‐17
22‐Jul‐19
20‐Oct‐17
22‐Oct‐17
24‐Oct‐17
13‐Nov‐17
13‐Nov‐17
13‐Nov‐17
95%
95%
0%
0.053%
0.053%
352
8
PIPING
DEM‐3963‐FAHN‐5‐50‐0001
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PLOT PLAN (DEMOLITION)
1
A
0.056%
29‐May‐17
8‐Jun‐17
13‐Jun‐17
14‐Jul‐17
4‐Aug‐17
14‐Aug‐17
31‐Oct‐18
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
27‐Aug‐17
14‐Sep‐17
18‐Oct‐17
22‐Jul‐19
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
27‐Aug‐17
14‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.053%
0.053%
353
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0001
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.1 EL.21.600 TO 24.050
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
22‐Jul‐19
20‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
6‐Aug‐17
8‐Aug‐17
31‐Aug‐17
0.053%
354
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0002
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 400, SHT.2 EL.21.600 & ABOVE (D
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
20‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
355
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0003
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.3 EL. 21.600 & ABOVE (
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
356
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0004
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.4 EL.21.600 & ABOVE (D
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
8‐Aug‐17
10‐Aug‐17
2‐Oct‐17
15‐Oct‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
8‐Aug‐17
10‐Aug‐17
2‐Oct‐17
15‐Oct‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
357
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0005
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.5 EL. 21.600 & ABOVE (
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
358
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0006
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.6 EL. 21.600 & ABOVE (
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
20‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
359
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0007
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.7 EL. 22.620 & ABOVE (
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
20‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
360
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0008
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.8 EL. 22.620 & ABOVE (
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
361
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0009
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.9 EL. 22.620 & ABOVE (
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
19‐Jul‐17
8‐Aug‐17
10‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
362
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0010
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.10 EL. 22.620 & ABOVE
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
363
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0011
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.11 EL. 22.620 & ABOVE
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
364
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0012
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.12 EL. 22.620 & ABOVE
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
22‐Jul‐19
19‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
365
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0013
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.13 EL. 22.620 & ABOVE
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
366
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0014
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.14 EL. 22.620 & ABOVE
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
367
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0015
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.15 EL. 22.620 & ABOVE
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
22‐Jul‐19
15‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
28‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
368
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0016
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.16 EL. 22.620 & ABOVE
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
20‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
369
8
PIPING
DEM‐3963‐FAHN‐5‐52‐0017
DEM
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING GA, AREA 401, SHT.17 EL. 22.620 & ABOVE
1
A
0.042%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
22‐Jul‐19
20‐Jul‐17
11‐Aug‐17
13‐Aug‐17
17‐Sep‐17
25‐Sep‐17
16‐Oct‐17
95%
95%
0%
0.040%
0.040%
370
8
PIPING
DEM‐3963‐FAHS‐5‐50‐0001
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PLOT PLAN (DEMOLITION)
1
A
0.056%
12‐Jun‐17
22‐Jun‐17
27‐Jun‐17
28‐Jul‐17
18‐Aug‐17
28‐Aug‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
27‐Aug‐17
14‐Sep‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
27‐Aug‐17
14‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.053%
0.053%
371
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0001
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.1 EL. 54.364 & ABOVE (
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
24‐Sep‐17
17‐Oct‐17
18‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
24‐Sep‐17
17‐Oct‐17
18‐Oct‐17
95%
95%
0%
0.040%
0.040%
Page 3 of 13
Page 74 of 170
0.040%
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC NO
ITEM CODE
DOC DESC
DOC CLASS
CURRENT REVISION
Original BL WV
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100%
ACTIAFC
ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
372
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0002
ITEM DOC DOC DESC CODE CLASS DEM DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.2 EL. 54.364 & ABOVE ( 1
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
373
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0003
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.3 EL. 54.364 & ABOVE (
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
95%
95%
0%
0.040%
0.040%
374
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0004
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.4 EL. 54.364 & ABOVE (
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
95%
95%
0%
0.040%
0.040%
SRN
375
SEQ
8
DISCIPLINE
PIPING
DOC NO
DEM‐3963‐FAHS‐5‐52‐0005
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.5 EL. 54.364 & ABOVE (
1
CURRENT REVISION A
SHUTD OWN PACKA GE SHUTD OWN
A
WV
0.042%
PLS
21‐Jul‐17
PLD
31‐Jul‐17
PLIFC
5‐Aug‐17
PLIFA
23‐Aug‐17
PLIAWH
2‐Sep‐17
PLIAFC
12‐Sep‐17
PLASBUILT
31‐Oct‐18
PLS
27‐Jul‐17
PLD
15‐Aug‐17
PLIFC
17‐Aug‐17
PLIFA
3‐Oct‐17
PLIAWH
3‐Oct‐17
PLIAFC
3‐Oct‐17
PLASBUILT
22‐Jul‐19
ACTS
27‐Jul‐17
ACTD
15‐Aug‐17
ACTIFC
17‐Aug‐17
ACTIFA
3‐Oct‐17
ACTIAWH
3‐Oct‐17
3‐Oct‐17
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
95%
95%
0%
Plan WF 0.040%
0.040%
Actual WF 0.040%
0.040%
376
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0006
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.6 EL. 54.700 & ABOVE (
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
95%
95%
0%
0.040%
0.040%
377
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0007
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.7 EL. 54.700 & ABOVE (
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
3‐Oct‐17
3‐Oct‐17
3‐Oct‐17
95%
95%
0%
0.040%
0.040%
15‐Aug‐17
16‐Aug‐17
17‐Aug‐17
18‐Aug‐17
22‐Jul‐19
27‐Jul‐17
14‐Aug‐17
15‐Aug‐17
16‐Aug‐17
17‐Aug‐17
18‐Aug‐17
379
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0009
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.9 EL. 54.364 & ABOVE (
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
380
378
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0010
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.10 EL. 54.364 & ABOVE
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
381
8
8
PIPING
PIPING
DEM‐3963‐FAHS‐5‐52‐0008
DEM‐3963‐FAHS‐5‐52‐0011
DEM
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.8 EL. 54.364 & ABOVE (
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.11 EL. 54.664 & ABOVE
1
1
A
0.042%
A
0.042%
21‐Jul‐17
21‐Jul‐17
31‐Jul‐17
31‐Jul‐17
5‐Aug‐17
5‐Aug‐17
23‐Aug‐17
23‐Aug‐17
2‐Sep‐17
2‐Sep‐17
12‐Sep‐17
12‐Sep‐17
31‐Oct‐18
31‐Oct‐18
27‐Jul‐17
27‐Jul‐17
14‐Aug‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
95%
95%
0%
0%
0.040%
0.040%
0.040%
0.040%
382
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0012
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.12 EL. 54.364 & ABOVE
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
383
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0013
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.13 EL. 54.364 & ABOVE
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
385
8
PIPING
DEM‐3963‐FAHS‐5‐52‐0015
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.15 EL. 54.364 & ABOVE
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
386
384
8
8
PIPING
PIPING
DEM‐3963‐FAHS‐5‐52‐0016
DEM‐3963‐FAHS‐5‐52‐0014
DEM
DEM
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.16 EL. 54.364 & ABOVE
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPING GA, AREA 701, SHT.14 EL. 54.364 & ABOVE
1
1
A
A
0.042%
0.042%
21‐Jul‐17
21‐Jul‐17
31‐Jul‐17
31‐Jul‐17
5‐Aug‐17
5‐Aug‐17
23‐Aug‐17
23‐Aug‐17
2‐Sep‐17
2‐Sep‐17
12‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
27‐Jul‐17
15‐Aug‐17
17‐Aug‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.040%
0.040%
387
8
PIPING
DEM‐3963‐JALM‐5‐50‐0001
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PLOT PLAN (DEMOLITION)
1
A
0.056%
19‐Jun‐17
29‐Jun‐17
4‐Jul‐17
4‐Aug‐17
25‐Aug‐17
4‐Sep‐17
31‐Oct‐18
22‐Jun‐17
2‐Aug‐17
3‐Aug‐17
27‐Aug‐17
20‐Sep‐17
18‐Oct‐17
22‐Jul‐19
22‐Jun‐17
2‐Aug‐17
3‐Aug‐17
27‐Aug‐17
20‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.053%
0.053%
388
8
PIPING
DEM‐3963‐JALM‐5‐52‐0001
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 803, SHT.1 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
18‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
22‐Jul‐19
27‐Jul‐17
18‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
95%
95%
0%
0.040%
0.040%
389
8
PIPING
DEM‐3963‐JALM‐5‐52‐0002
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 803, SHT.2 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
18‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
22‐Jul‐19
27‐Jul‐17
18‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
95%
95%
0%
0.040%
0.040%
390
8
PIPING
DEM‐3963‐JALM‐5‐52‐0003
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.3 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
18‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
22‐Jul‐19
27‐Jul‐17
18‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
95%
95%
0%
0.040%
0.040%
391
8
PIPING
DEM‐3963‐JALM‐5‐52‐0004
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.4 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
22‐Jul‐19
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
95%
95%
0%
0.040%
0.040%
392
8
PIPING
DEM‐3963‐JALM‐5‐52‐0005
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.5 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
22‐Jul‐19
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
95%
95%
0%
0.040%
0.040%
393
8
PIPING
DEM‐3963‐JALM‐5‐52‐0006
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.6 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
22‐Jul‐19
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
95%
95%
0%
0.040%
0.040%
394
8
PIPING
DEM‐3963‐JALM‐5‐52‐0007
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.7 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
22‐Jul‐19
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
95%
95%
0%
0.040%
0.040%
395
8
PIPING
DEM‐3963‐JALM‐5‐52‐0008
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.8 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
22‐Jul‐19
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
95%
95%
0%
0.040%
0.040%
396
8
PIPING
DEM‐3963‐JALM‐5‐52‐0009
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.9 EL. 63.000 & ABOVE (DE
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
22‐Jul‐19
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
95%
95%
0%
0.040%
0.040%
397
8
PIPING
DEM‐3963‐JALM‐5‐52‐0010
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.10 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
22‐Jul‐19
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
95%
95%
0%
0.040%
0.040%
398
8
PIPING
DEM‐3963‐JALM‐5‐52‐0011
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.11 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
22‐Jul‐19
27‐Jul‐17
17‐Aug‐17
20‐Aug‐17
9‐Nov‐17
9‐Nov‐17
9‐Nov‐17
95%
95%
0%
0.040%
0.040%
399
8
PIPING
DEM‐3963‐JALM‐5‐52‐0012
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.12 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
22‐Jul‐19
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
5‐Oct‐17
9‐Oct‐17
9‐Oct‐17
95%
95%
0%
0.040%
0.040%
400
8
PIPING
DEM‐3963‐JALM‐5‐52‐0013
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.13 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
22‐Jul‐19
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
401
8
PIPING
DEM‐3963‐JALM‐5‐52‐0014
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.14 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
22‐Jul‐19
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
402
8
PIPING
DEM‐3963‐JALM‐5‐52‐0015
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.15 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
22‐Jul‐19
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
403
8
PIPING
DEM‐3963‐JALM‐5‐52‐0016
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.16 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
22‐Jul‐19
27‐Jul‐17
18‐Aug‐17
21‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
404
8
PIPING
DEM‐3963‐JALM‐5‐52‐0017
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.17 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
19‐Aug‐17
22‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
22‐Jul‐19
27‐Jul‐17
19‐Aug‐17
22‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
405
8
PIPING
DEM‐3963‐JALM‐5‐52‐0018
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.18 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
19‐Aug‐17
22‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
22‐Jul‐19
27‐Jul‐17
19‐Aug‐17
22‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
406
8
PIPING
DEM‐3963‐JALM‐5‐52‐0019
DEM
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING GA, AREA 805, SHT.19 EL. 63.000 & ABOVE (D
1
A
0.042%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
31‐Oct‐18
27‐Jul‐17
19‐Aug‐17
22‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
22‐Jul‐19
27‐Jul‐17
19‐Aug‐17
22‐Aug‐17
27‐Sep‐17
11‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
407
8
PIPING
DEM‐3963‐KAHM‐5‐50‐0001
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PLOT PLAN (DEMOLITION)
1
A
0.056%
5‐Jun‐17
15‐Jun‐17
20‐Jun‐17
21‐Jul‐17
11‐Aug‐17
21‐Aug‐17
31‐Oct‐18
7‐Jun‐17
2‐Aug‐17
3‐Aug‐17
27‐Aug‐17
20‐Sep‐17
18‐Oct‐17
22‐Jul‐19
7‐Jun‐17
2‐Aug‐17
3‐Aug‐17
27‐Aug‐17
20‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.053%
408
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0001
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.1 EL.98.973 & ABOVE (D
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
11‐Jul‐17
17‐Oct‐17
18‐Oct‐17
6‐Nov‐17
6‐Nov‐17
23‐Nov‐17
22‐Jul‐19
11‐Jul‐17
17‐Oct‐17
18‐Oct‐17
6‐Nov‐17
6‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.040%
0.040%
409
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0002
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.2 EL. 99.143 & ABOVE (
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.040%
0.040%
410
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0003
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.3 EL.99.143 & ABOVE (D
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.040%
0.040%
411
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0004
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.4 EL. 99.143 & ABOVE (
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
22‐Jul‐19
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.040%
0.040%
412
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0005
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.5 EL. 99.743 & ABOVE (
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
17‐Oct‐17
18‐Oct‐17
6‐Nov‐17
6‐Nov‐17
23‐Nov‐17
22‐Jul‐19
13‐Jul‐17
17‐Oct‐17
18‐Oct‐17
6‐Nov‐17
6‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.040%
0.040%
413
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0006
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.6 EL. 98.973 & ABOVE (
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
22‐Jul‐19
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.040%
0.040%
414
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0007
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.7 EL. 99.863 & ABOVE (
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
17‐Oct‐17
18‐Oct‐17
6‐Nov‐17
6‐Nov‐17
23‐Nov‐17
22‐Jul‐19
13‐Jul‐17
17‐Oct‐17
18‐Oct‐17
6‐Nov‐17
6‐Nov‐17
23‐Nov‐17
95%
95%
0%
0.040%
0.040%
0.053%
415
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0008
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.8 SH24 EL.99.743 & AB
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
22‐Jul‐19
13‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.040%
0.040%
416
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0009
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255, SHT.9 EL.99.443 & ABOVE (D
1
A
0.042%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
22‐Jul‐19
8‐Jul‐17
2‐Aug‐17
3‐Aug‐17
18‐Sep‐17
25‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.040%
0.040%
417
8
PIPING
DEM‐3963‐KAHN‐5‐50‐0001
DEM
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PLOT PLAN (DEMOLITION)
1
A
0.056%
26‐Jun‐17
6‐Jul‐17
11‐Jul‐17
11‐Aug‐17
1‐Sep‐17
11‐Sep‐17
31‐Oct‐18
29‐Jun‐17
2‐Aug‐17
3‐Aug‐17
27‐Aug‐17
20‐Sep‐17
18‐Oct‐17
22‐Jul‐19
29‐Jun‐17
2‐Aug‐17
3‐Aug‐17
27‐Aug‐17
20‐Sep‐17
18‐Oct‐17
95%
95%
0%
0.053%
0.053%
418
8
PIPING
DEM‐3963‐KAHN‐5‐52‐0001
DEM
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.1 EL.103.590 & ABOVE
1
A
0.042%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
22‐Jul‐19
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
95%
95%
0%
0.040%
0.040%
419
8
PIPING
DEM‐3963‐KAHN‐5‐52‐0002
DEM
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.2 EL.103.590 & ABOVE
1
A
0.042%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
22‐Jul‐19
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
95%
95%
0%
0.040%
0.040%
420
8
PIPING
DEM‐3963‐KAHN‐5‐52‐0003
DEM
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.3 EL.103.590 & ABOVE
1
A
0.042%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
22‐Jul‐19
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
95%
95%
0%
0.040%
0.040%
421
8
PIPING
DEM‐3963‐KAHN‐5‐52‐0004
DEM
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.4 EL.103.590 & ABOVE
1
A
0.042%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
22‐Jul‐19
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
95%
95%
0%
0.040%
0.040%
422
8
PIPING
DEM‐3963‐KAHN‐5‐52‐0005
DEM
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.5 EL.103.590 & ABOVE
1
A
0.042%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
22‐Jul‐19
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
95%
95%
0%
0.040%
423
8
PIPING
DEM‐3963‐KAHN‐5‐52‐0006
DEM
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151, SHT.6 EL.103.590 & ABOVE
1
A
0.042%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
22‐Jul‐19
20‐Aug‐17
17‐Aug‐17
20‐Aug‐17
19‐Oct‐17
30‐Oct‐17
19‐Nov‐17
95%
95%
0%
0.040%
0.040%
424
8
PIPING
DEM‐3963‐KAHS‐5‐50‐0001
DEM
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PLOT PLAN (DEMOLITION)
1
A
0.056%
29‐Jun‐17
9‐Jul‐17
14‐Jul‐17
14‐Aug‐17
4‐Sep‐17
14‐Sep‐17
31‐Oct‐18
28‐Jun‐17
2‐Aug‐17
3‐Aug‐17
3‐Aug‐17
3‐Aug‐17
3‐Aug‐17
22‐Jul‐19
28‐Jun‐17
2‐Aug‐17
3‐Aug‐17
3‐Aug‐17
3‐Aug‐17
3‐Aug‐17
95%
95%
0%
0.053%
0.053%
425
8
PIPING
DEM‐3963‐KAHS‐5‐52‐0001
DEM
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.1 EL.26.000 TO 28.600
1
A
0.042%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
25‐Sep‐17
14‐Nov‐17
22‐Jul‐19
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
25‐Sep‐17
14‐Nov‐17
95%
95%
0%
0.040%
0.040% 0.040%
0.040%
426
8
PIPING
DEM‐3963‐KAHS‐5‐52‐0002
DEM
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.2 EL.28.600 & ABOVE
1
A
0.042%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
28‐Sep‐17
14‐Nov‐17
22‐Jul‐19
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
28‐Sep‐17
14‐Nov‐17
95%
95%
0%
0.040%
427
8
PIPING
DEM‐3963‐KAHS‐5‐52‐0003
DEM
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.3 EL.26.000 TO 28.600
1
A
0.042%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
28‐Sep‐17
14‐Nov‐17
22‐Jul‐19
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
28‐Sep‐17
14‐Nov‐17
95%
95%
0%
0.040%
428
8
PIPING
DEM‐3963‐KAHS‐5‐52‐0004
DEM
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.4 EL.26.000 &ABOVE (
1
A
0.042%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
28‐Sep‐17
14‐Nov‐17
22‐Jul‐19
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
28‐Sep‐17
14‐Nov‐17
95%
95%
0%
0.040%
0.040%
429
8
PIPING
DEM‐3963‐KAHS‐5‐52‐0005
DEM
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.5 EL.26.000 & ABOVE
1
A
0.042%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
28‐Sep‐17
14‐Nov‐17
22‐Jul‐19
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
28‐Sep‐17
14‐Nov‐17
95%
95%
0%
0.040%
0.040%
430
8
PIPING
DEM‐3963‐KAHS‐5‐52‐0006
DEM
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.6 EL.26.000 & ABOVE
1
A
0.042%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
25‐Sep‐17
14‐Nov‐17
22‐Jul‐19
16‐Aug‐17
18‐Aug‐17
21‐Aug‐17
18‐Sep‐17
25‐Sep‐17
14‐Nov‐17
95%
95%
0%
0.040%
0.040%
DEM
9‐Sep‐17
19‐Sep‐17
19‐Oct‐17
19‐Nov‐17
21‐Nov‐17
431
PIPING
DEM‐3963‐KAHS‐5‐52‐0007
1
A
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
5‐Dec‐17
5‐Dec‐17
5‐Dec‐17
22‐Jul‐19
19‐Oct‐17
19‐Nov‐17
21‐Nov‐17
5‐Dec‐17
5‐Dec‐17
432
8
PIPING
3963‐FAHM‐5‐32‐0002
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; VALVE LIST
1
A
0.140%
19‐May‐17
29‐May‐17
3‐Jun‐17
4‐Jul‐17
25‐Jul‐17
4‐Aug‐17
31‐Oct‐18
25‐May‐17
22‐Jul‐17
23‐Jul‐17
10‐Aug‐17
20‐Aug‐17
26‐Oct‐17
22‐Jul‐19
25‐May‐17
22‐Jul‐17
23‐Jul‐17
10‐Aug‐17
20‐Aug‐17
26‐Oct‐17
95%
95%
0%
0.133%
0.133%
433
8
PIPING
3963‐FAHS‐5‐32‐0002
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; VALVE LIST
1
B
0.168%
21‐May‐17
31‐May‐17
5‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
25‐May‐17
22‐Jul‐17
23‐Jul‐17
10‐Aug‐17
23‐Aug‐17
24‐Aug‐17
22‐Jul‐19
25‐May‐17
22‐Jul‐17
23‐Jul‐17
10‐Aug‐17
23‐Aug‐17
24‐Aug‐17
95%
95%
0%
0.160%
0.160%
OT
22‐Jul‐19
25‐May‐17
22‐Jul‐17
434
8
0.084%
28‐Jul‐17
3963‐FAHN‐5‐32‐0002
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; VALVE LIST
1
A
0.140%
23‐May‐17
7‐Jun‐17
8‐Jul‐17
29‐Jul‐17
8‐Aug‐17
31‐Oct‐18
23‐Jul‐17
10‐Aug‐17
20‐Aug‐17
5‐Nov‐17
23‐Jul‐17
10‐Aug‐17
20‐Aug‐17
5‐Nov‐17
3963‐KAHM‐5‐32‐0002
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; VALVE LIST
1
A
0.070%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
25‐May‐17
19‐Jul‐17
20‐Jul‐17
23‐Aug‐17
14‐Sep‐17
14‐Nov‐17
22‐Jul‐19
25‐May‐17
19‐Jul‐17
20‐Jul‐17
23‐Aug‐17
14‐Sep‐17
14‐Nov‐17
95%
95%
0%
0.067%
0.067%
3963‐KAHS‐5‐32‐0002
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; VALVE LIST
1
A
0.070%
16‐May‐17
26‐May‐17
31‐May‐17
1‐Jul‐17
22‐Jul‐17
1‐Aug‐17
31‐Oct‐18
25‐May‐17
24‐Jul‐17
25‐Jul‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
22‐Jul‐19
25‐May‐17
24‐Jul‐17
25‐Jul‐17
2‐Nov‐17
2‐Nov‐17
24‐Jan‐18
95%
95%
0%
0.067%
0.067%
27‐May‐17
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; VALVE LIST
1
A
PIPING
3963‐JALM‐5‐32‐0002
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; VALVE LIST
1
A
3963‐KAHM‐5‐32‐0015
ET
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; VALVE LIST (EARLY TIE‐IN)
1
A
440
ET
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; VALVE LIST (EARLY TIE‐IN)
1
A
Y
17‐May‐17
31‐Oct‐18
25‐May‐17
23‐Aug‐17
14‐Sep‐17
22‐Jul‐19
25‐May‐17
23‐Aug‐17
14‐Sep‐17
22‐May‐17
1‐Jun‐17
6‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
25‐May‐17
24‐Jul‐17
25‐Jul‐17
23‐Aug‐17
14‐Sep‐17
2‐Nov‐17
22‐Jul‐19
25‐May‐17
24‐Jul‐17
25‐Jul‐17
23‐Aug‐17
14‐Sep‐17
2‐Nov‐17
95%
95%
0%
0.133%
0.133%
0.070%
8‐Mar‐17
18‐Mar‐17
23‐Mar‐17
23‐Apr‐17
14‐May‐17
24‐May‐17
31‐Oct‐18
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
30‐May‐17
12‐Jun‐17
12‐Jun‐17
22‐Jul‐19
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
30‐May‐17
12‐Jun‐17
12‐Jun‐17
95%
95%
0%
0.067%
0.067%
2‐Jul‐17
23‐Jul‐17
2‐Aug‐17
25‐Jul‐17
2‐Nov‐17
24‐Jul‐17
25‐Jul‐17
2‐Nov‐17
95%
95%
0%
0.067%
0.067%
8‐Mar‐17
18‐Mar‐17
23‐Mar‐17
23‐Apr‐17
14‐May‐17
24‐May‐17
31‐Oct‐18
17‐Mar‐17
20‐Mar‐17
30‐May‐17
12‐Jun‐17
12‐Jun‐17
22‐Jul‐19
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
30‐May‐17
12‐Jun‐17
12‐Jun‐17
95%
95%
0%
0.067%
0.067%
PIPING
3963‐KAHS‐5‐32‐0017
ET
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; VALVE LIST (EARLY TIE‐IN)
1
A
Y
0.070%
8‐Mar‐17
18‐Mar‐17
23‐Mar‐17
23‐Apr‐17
14‐May‐17
24‐May‐17
31‐Oct‐18
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
30‐May‐17
12‐Jun‐17
12‐Jun‐17
22‐Jul‐19
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
30‐May‐17
12‐Jun‐17
12‐Jun‐17
95%
95%
0%
0.067%
0.067%
3963‐DGEN‐5‐17‐0006
ET
DUKHAN FIELD; TECHNICAL BID EVALUATION FOR BALL VALVES (EARLY TIE‐INS)
1
A
Y
0.056%
26‐Mar‐17
5‐Apr‐17
10‐Apr‐17
11‐May‐17
1‐Jun‐17
11‐Jun‐17
31‐Oct‐18
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
5‐Jun‐17
24‐Jul‐17
25‐Jul‐17
22‐Jul‐19
15‐Mar‐17
17‐Mar‐17
20‐Mar‐17
5‐Jun‐17
24‐Jul‐17
25‐Jul‐17
95%
95%
0%
0.053%
0.053%
443
8
PIPING
3963‐DGEN‐5‐31‐0001
OT
DUKHAN FIELD ‐MTO FOR BALL VALVES
1
A
0.196%
24‐Jul‐17
26‐Jul‐17
28‐Jul‐17
9‐Aug‐17
21‐Aug‐17
2‐Sep‐17
31‐Oct‐18
21‐Mar‐17
30‐Jul‐17
31‐Jul‐17
9‐Dec‐17
21‐Dec‐17
21‐Dec‐17
22‐Jul‐19
21‐Mar‐17
30‐Jul‐17
31‐Jul‐17
9‐Dec‐17
21‐Dec‐17
21‐Dec‐17
95%
95%
0%
0.186%
0.186%
444
8
PIPING
3963‐DGEN‐5‐31‐0002
OT
DUKHAN FIELD ‐ MTO FOR MANUAL VALVES (GATE, GLOBE, NEEDLE & CHECK)
1
A
0.191%
24‐Jul‐17
26‐Jul‐17
28‐Jul‐17
9‐Aug‐17
21‐Aug‐17
2‐Sep‐17
31‐Oct‐18
27‐Jul‐17
30‐Jul‐17
31‐Jul‐17
25‐Oct‐17
25‐Oct‐17
4‐Dec‐17
22‐Jul‐19
27‐Jul‐17
30‐Jul‐17
31‐Jul‐17
25‐Oct‐17
25‐Oct‐17
4‐Dec‐17
95%
95%
0%
0.181%
0.181%
445
8
PIPING
3963‐DGEN‐5‐13‐0008
OT
DUKHAN FIELD ‐DATASHEET FOR BUTTERFLY VALVES
1
A
0.090%
1‐Aug‐17
6‐Aug‐17
11‐Aug‐17
21‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jul‐17
1‐Aug‐17
3‐Aug‐17
17‐Aug‐17
30‐Aug‐17
5‐Oct‐17
22‐Jul‐19
28‐Jul‐17
1‐Aug‐17
3‐Aug‐17
17‐Aug‐17
30‐Aug‐17
5‐Oct‐17
95%
95%
0%
0.085%
0.085%
3963‐DGEN‐5‐13‐0009
OT
DUKHAN FIELD ‐ DATASHEET FOR STRAINERS
1
A
8
PIPING
3963‐DGEN‐5‐15‐0007
OT
DUKHAN FIELD – MATERIAL REQUISITION FOR BUTTERFLY VALVES
1
A
6
PIPING
3963‐DGEN‐5‐00‐0001
OT
MISCELLANEOUS ‐ PIPING
0
0.168%
10‐Sep‐17
15‐Mar‐17
24‐Jul‐17
PIPING
447
0.070%
1‐Jun‐17
8
448
Y
0.070% 0.140%
8
PIPING
3963‐KAHN‐5‐32‐0016
OT
441
8
PIPING
3963‐KAHN‐5‐32‐0002
0.133%
442
446
8
PIPING
0.133%
0.080%
PIPING
PIPING
0%
0.080%
PIPING
8
95%
0%
PIPING
8
95%
95%
8
8
22‐Jul‐17
95%
8
438
25‐May‐17
5‐Dec‐17
435
439
2‐Jun‐17
31‐Oct‐18
436 437
8
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300, SHT.7 EL.26.000 & ABOVE
0.040%
1‐Aug‐17
6‐Aug‐17
11‐Aug‐17
21‐Aug‐17
31‐Aug‐17
31‐Oct‐18
28‐Jul‐17
1‐Aug‐17
3‐Aug‐17
17‐Aug‐17
19‐Sep‐17
20‐Sep‐17
22‐Jul‐19
28‐Jul‐17
1‐Aug‐17
3‐Aug‐17
17‐Aug‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.160%
0.160%
0.084%
1‐Aug‐17
6‐Aug‐17
11‐Aug‐17
21‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jul‐17
1‐Aug‐17
3‐Aug‐17
17‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
28‐Jul‐17
1‐Aug‐17
3‐Aug‐17
17‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.080%
0.080%
0.000%
31‐Aug‐17
6‐Sep‐17
7‐Sep‐17
14‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
1‐Feb‐18
6‐Feb‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
22‐Jul‐19
1‐Feb‐18
6‐Feb‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
95%
95%
0%
0.000%
0.000%
449
8
PIPING
3963‐FAHM‐7780‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7780‐6"‐OC‐CS1‐900‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
450
8
PIPING
3963‐FAHM‐7775‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7775‐6''‐OC‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
451
8
PIPING
3963‐FAHM‐7776‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7776‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
452
8
PIPING
3963‐FAHM‐1222‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐1222‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
453
8
PIPING
3963‐FAHM‐7790‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7790‐6''‐WD‐L5‐300‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
454
8
PIPING
3963‐FAHM‐7811‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7811‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
455
8
PIPING
3963‐FAHM‐7822‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7822‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
456
8
PIPING
3963‐FAHM‐7807‐3‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7807‐3''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
457
8
PIPING
3963‐FAHM‐7808‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7808‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
458
8
PIPING
3963‐FAHM‐7809‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7809‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
459
8
PIPING
3963‐FAHM‐7810‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7810‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
460
8
PIPING
3963‐FAHM‐8008‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8008‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
461
8
PIPING
3963‐FAHM‐8009‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8009‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
462
8
PIPING
3963‐FAHM‐8010‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8010‐3''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
463
8
PIPING
3963‐FAHM‐8011‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8011‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
464
8
PIPING
3963‐FAHM‐8013‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8013‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
0.019%
0.019%
465
8
PIPING
3963‐FAHM‐8012‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8012‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
466
8
PIPING
3963‐FAHM‐7777‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7777‐6"‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
467
8
PIPING
3963‐FAHM‐7778‐4‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7778‐4''‐OC‐CS1‐300‐4X
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
29‐Jan‐18
29‐Jan‐18
468
8
PIPING
3963‐FAHM‐7779‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7779‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
469
8
PIPING
3963‐FAHM‐7791‐4‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7791‐4"‐WD‐L5‐300‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
470
8
PIPING
3963‐FAHM‐7792‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7792‐6''‐WD‐L5‐300‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
471
8
PIPING
3963‐FAHM‐8015‐8‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8015‐8''‐GV‐CS1‐150‐8X
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
472
8
PIPING
3963‐FAHM‐8014‐4‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8014‐4''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
473
8
PIPING
3963‐FAHM‐1224‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐1224‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
474
8
PIPING
3963‐FAHM‐1223‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐1223‐8"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
475
8
PIPING
3963‐FAHM‐1225‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐1225‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
476
8
PIPING
3963‐FAHM‐1227‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐1227‐8''‐GP‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
477
8
PIPING
3963‐FAHM‐1228‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐1228‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
478
8
PIPING
3963‐FAHM‐8017‐2‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8017‐2"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
479
8
PIPING
3963‐FAHM‐8016‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8016‐3"‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
480
8
PIPING
3963‐FAHM‐1226‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐1226‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
481
8
PIPING
3963‐FAHM‐7818‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7818‐1''‐OD‐CS1‐300‐4X
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
482
8
PIPING
3963‐FAHM‐7823‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7823‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
483
8
PIPING
3963‐FAHM‐7824‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7824‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
484
8
PIPING
3963‐FAHM‐7816‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7816‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
485
8
PIPING
3963‐FAHM‐7815‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7815‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
486
8
PIPING
3963‐FAHM‐7820‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7820‐2"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
487
8
PIPING
3963‐FAHM‐7817‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7817‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
488
8
PIPING
3963‐FAHM‐7821‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7821‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
3
3
3
3
0
0
0
0
0.020%
0.020%
0.020%
21‐Aug‐17
21‐Aug‐17
21‐Aug‐17
31‐Aug‐17
31‐Aug‐17
31‐Aug‐17
5‐Sep‐17
5‐Sep‐17
5‐Sep‐17
16‐Sep‐17
16‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
18‐Jan‐18
28‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
22‐Jul‐19
22‐Jul‐19
18‐Jan‐18
18‐Jan‐18
18‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
95%
95%
95%
95%
0%
0%
0%
0.019%
0.019%
0.019%
0.019%
0.019%
0.019%
0.019%
489
8
PIPING
3963‐FAHM‐7819‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7819‐1"‐OD‐CS1‐300‐4X
490
8
PIPING
3963‐FAHM‐7812‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7812‐1"‐OD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
491
8
PIPING
3963‐FAHM‐7813‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7813‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
0.019%
492
8
PIPING
3963‐FAHM‐8012‐2‐AI
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐8012‐2"‐AI‐CS1‐150‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
14‐Mar‐18
14‐Mar‐18
14‐Mar‐18
14‐Mar‐18
14‐Mar‐18
22‐Jul‐19
18‐Jan‐18
14‐Mar‐18
14‐Mar‐18
14‐Mar‐18
14‐Mar‐18
14‐Mar‐18
95%
95%
0%
0.019%
0.019%
493
8
PIPING
3963‐FAHM‐7805‐4‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7805‐4"‐WF‐L5‐150‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
494
8
PIPING
3963‐FAHM‐7807‐2‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:14‐7807‐2"‐WF‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
495
8
PIPING
3963‐FAHN‐4304‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4304‐6"‐OC‐CS1‐900‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
Page 4 of 13
Page 75 of 170
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC NO
ITEM CODE
DOC DESC
DOC CLASS
CURRENT REVISION
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100% ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
SRN
SEQ
WV
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
ACTS
ACTD
ACTIFC
ACTIFA
ACTIAWH
ACTIAFC
496
8
PIPING
3963‐FAHN‐4299‐6‐OC
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
497
8
PIPING
3963‐FAHN‐4300‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4300‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
498
8
PIPING
3963‐FAHN‐4315‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4315‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
499
8
PIPING
3963‐FAHN‐4299‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4299‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
500
8
PIPING
3963‐FAHN‐4302‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4302‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
501
8
PIPING
3963‐FAHN‐4303‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4303‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
502
8
PIPING
3963‐FAHN‐4299‐3‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4299‐3''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
503
8
PIPING
3963‐FAHN‐4314‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4314‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
504
8
PIPING
3963‐FAHN‐4300‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4300‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
505
8
PIPING
3963‐FAHN‐4301‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4301‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
506
8
PIPING
3963‐FAHN‐4340‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4340‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
507
8
PIPING
3963‐FAHN‐4339‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4339‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
508
8
PIPING
3963‐FAHN‐4338‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4338‐3''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
509
8
PIPING
3963‐FAHN‐4335‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4335‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
510
8
PIPING
3963‐FAHN‐4337‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4337‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
511
8
PIPING
3963‐FAHN‐4336‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4336‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.019%
0.019% 0.019%
DOC NO
CURRENT REVISION 0
Original BL WV
ITEM DOC DESC CODE OT PIPING ISOMETRICS ‐ LINE NO.:12‐4299‐6''‐OC‐CS1‐150‐8X
DISCIPLINE
DOC CLASS 3
SHUTD OWN PACKA GE SHUTD OWN
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
Plan WF
Actual WF
0.019%
0.019% 0.019%
0.019%
512
8
PIPING
3963‐FAHN‐4303‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4303‐6"‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.019%
513
8
PIPING
3963‐FAHN‐4301‐4‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4301‐4''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
514
8
PIPING
3963‐FAHN‐4302‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4302‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
515
8
PIPING
3963‐FAHN‐4301‐4‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4301‐4"‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
516
8
PIPING
3963‐FAHN‐4300‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4300‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.019%
0.019%
517
8
PIPING
3963‐FAHN‐4333‐8‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4333‐8''‐GV‐CS1‐150‐8X
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
518
8
PIPING
3963‐FAHN‐4334‐4‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4334‐4''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.019%
0.019%
519
8
PIPING
3963‐FAHN‐4321‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4321‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
520
8
PIPING
3963‐FAHN‐4332‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4332‐8"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
27‐Feb‐18
1‐Mar‐18
1‐Mar‐18
1‐Mar‐18
1‐Mar‐18
22‐Jul‐19
18‐Jan‐18
27‐Feb‐18
1‐Mar‐18
1‐Mar‐18
1‐Mar‐18
1‐Mar‐18
95%
95%
0%
0.019%
0.019%
521
8
PIPING
3963‐FAHN‐4317‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4317‐8''‐GP‐CS1‐150‐8X
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
522
8
PIPING
3963‐FAHN‐4318‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4318‐8''‐GP‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.019%
0.019%
523
8
PIPING
3963‐FAHN‐4320‐2‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4320‐2"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.019%
0.019%
524
8
PIPING
3963‐FAHN‐4319‐3‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4319‐3"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.019%
0.019%
3
3
0
0
0.020%
0.020%
21‐Aug‐17
21‐Aug‐17
31‐Aug‐17
31‐Aug‐17
5‐Sep‐17
5‐Sep‐17
16‐Sep‐17
16‐Sep‐17
5‐Feb‐18
7‐Feb‐18
22‐Jul‐19
22‐Jul‐19
18‐Jan‐18
18‐Jan‐18
4‐Feb‐18
6‐Feb‐18
5‐Feb‐18
7‐Feb‐18
5‐Feb‐18
7‐Feb‐18
5‐Feb‐18
7‐Feb‐18
5‐Feb‐18
7‐Feb‐18
95%
95%
95%
95%
0%
0%
0.019%
0.019%
0.019%
0.019%
0.019%
525
8
PIPING
3963‐FAHN‐4316‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4316‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
526
8
PIPING
3963‐FAHN‐4310‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4310‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
527
8
PIPING
3963‐FAHN‐4313‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4313‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
528
8
PIPING
3963‐FAHN‐4307‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4307‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
529
8
PIPING
3963‐FAHN‐4306‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4306‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
530
8
PIPING
3963‐FAHN‐4308‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4308‐2"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
18‐Jan‐18
6‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.019%
0.019%
531
8
PIPING
3963‐FAHN‐4311‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4311‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
532
8
PIPING
3963‐FAHN‐4312‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4312‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
533
8
PIPING
3963‐FAHN‐4315‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4315‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
534
8
PIPING
3963‐FAHN‐4309‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4309‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
535
8
PIPING
3963‐FAHN‐4304‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4304‐1"‐OD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
536
8
PIPING
3963‐FAHN‐4305‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4305‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
18‐Jan‐18
4‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.019%
0.019%
537
8
PIPING
3963‐FAHN‐4343‐2‐AI
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4343‐2"‐AI‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
18‐Jan‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.019%
0.019%
538
8
PIPING
3963‐FAHN‐4304‐4‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:12‐4304‐4"‐WF‐L5‐150‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
PIPING
3963‐FAHN‐4306‐2‐WF
PIPING ISOMETRICS ‐ LINE NO.:12‐4305‐2"‐WF‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
540
8
PIPING
3963‐FAHS‐6006‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6006‐6"‐OC‐CS1‐900‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
541
8
PIPING
3963‐FAHS‐6001‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6001‐6''‐OC‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
542
8
PIPING
3963‐FAHS‐6002‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6002‐6''‐OC‐CS1‐300‐4X
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
543
8
PIPING
3963‐FAHS‐6278‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6278‐8''‐GP‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
22‐Jul‐19
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
95%
95%
0%
0.019%
0.019%
544
8
PIPING
3963‐FAHS‐6228‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6228‐6''‐WD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
22‐Jul‐19
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
95%
95%
0%
0.019%
0.019%
545
8
PIPING
3963‐FAHS‐6005‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6005‐2''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
546
8
PIPING
3963‐FAHS‐6004‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6004‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
547
8
PIPING
3963‐FAHS‐6006‐3‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6006‐3''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
548
8
PIPING
3963‐FAHS‐6001‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6001‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
549
8
PIPING
3963‐FAHS‐6002‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6002‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
550
8
PIPING
3963‐FAHS‐6003‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6003‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
551
8
PIPING
3963‐FAHS‐6295‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6295‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
552
8
PIPING
3963‐FAHS‐6299‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6299‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
553
8
PIPING
3963‐FAHS‐6297‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6297‐3''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
554
8
PIPING
3963‐FAHS‐6300‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6300‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
555
8
PIPING
3963‐FAHS‐6298‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6298‐6''‐GV‐CS1‐150‐8X
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
556
8
PIPING
3963‐FAHS‐6296‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6296‐10''‐GV‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
557
8
PIPING
3963‐FAHS‐6004‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6004‐6"‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
558
8
PIPING
3963‐FAHS‐6005‐4‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6005‐4''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
559
8
PIPING
3963‐FAHS‐6017‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6017‐6''‐OC‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
560
8
PIPING
3963‐FAHS‐6230‐4‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6230‐4"‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
561
8
PIPING
3963‐FAHS‐6229‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6229‐6''‐WD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
562
8
PIPING
3963‐FAHS‐6302‐8‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6302‐8''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
563
8
PIPING
3963‐FAHS‐6303‐4‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6303‐4''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
22‐Jul‐19
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
95%
95%
0%
0.019%
564
8
PIPING
3963‐FAHS‐6284‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6284‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
565
8
PIPING
3963‐FAHS‐6301‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6301‐8"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
8‐Apr‐18
8‐Apr‐18
8‐Apr‐18
8‐Apr‐18
8‐Apr‐18
22‐Jul‐19
18‐Jan‐18
8‐Apr‐18
8‐Apr‐18
8‐Apr‐18
8‐Apr‐18
8‐Apr‐18
95%
95%
0%
0.019%
0.019%
566
8
PIPING
3963‐FAHS‐6279‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6279‐8''‐GP‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
22‐Jul‐19
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
95%
95%
0%
0.019%
0.019%
539
567
8
OT
3
3
0
0
0.020%
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
21‐Sep‐17
0.019%
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
0.019%
0.019%
8
PIPING
3963‐FAHS‐6283‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6283‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
568
8
PIPING
3963‐FAHS‐6281‐2‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6281‐2"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
569
8
PIPING
3963‐FAHS‐6280‐3‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6280‐3"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
22‐Jul‐19
18‐Jan‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
14‐Feb‐18
95%
95%
0%
0.019%
0.019%
570
8
PIPING
3963‐FAHS‐6282‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6282‐6"‐GP‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
571
8
PIPING
3963‐FAHS‐6012‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6012‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
572
8
PIPING
3963‐FAHS‐6285‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6285‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
573
8
PIPING
3963‐FAHS‐6010‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6010‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
574
8
PIPING
3963‐FAHS‐6009‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6009‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
575
8
PIPING
3963‐FAHS‐6015‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6015‐2"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
576
8
PIPING
3963‐FAHS‐6016‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6016‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
577
8
PIPING
3963‐FAHS‐6011‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6011‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
578
8
PIPING
3963‐FAHS‐6014‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6014‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
579
8
PIPING
3963‐FAHS‐6013‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6013‐1"‐OD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
580
8
PIPING
3963‐FAHS‐6007‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6007‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
581
8
PIPING
3963‐FAHS‐6008‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6008‐1"‐OD‐CS1‐150‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
18‐Jan‐18
13‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.019%
0.019%
582
8
PIPING
3963‐FAHS‐6306‐2‐AI
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6306‐2"‐AI‐
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
15‐Mar‐18
15‐Mar‐18
15‐Mar‐18
15‐Mar‐18
15‐Mar‐18
22‐Jul‐19
18‐Jan‐18
15‐Mar‐18
15‐Mar‐18
15‐Mar‐18
15‐Mar‐18
15‐Mar‐18
95%
95%
0%
0.019%
0.019%
583
8
PIPING
3963‐FAHS‐6233‐4‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:13‐6233‐4"‐WF‐L5‐150‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
584
PIPING ISOMETRICS ‐ LINE NO.:13‐6235‐2"‐WF‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
585
8
PIPING
3963‐KAHM‐1345‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐1345‐6"‐OC‐CS1‐900‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
586
8
PIPING
3963‐KAHM‐1346‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐1346‐6''‐OC‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
22‐Jul‐19
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
95%
95%
0%
0.019%
0.019%
587
8
PIPING
3963‐KAHM‐1348‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐1348‐6''‐OC‐CS1‐300‐4X
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
95%
95%
0%
0.019%
0.019%
588
8
PIPING
3963‐KAHM‐8601‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8601‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
589
8
PIPING
3963‐KAHM‐8098‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8098‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
22‐Jul‐19
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
95%
95%
0%
0.019%
0.019%
590
8
PIPING
3963‐KAHM‐8083‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8083‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
591
8
PIPING
3963‐KAHM‐8081‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8081‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
592
8
8
PIPING
PIPING
3963‐FAHS‐6235‐2‐WF
3963‐KAHM‐8084‐3‐OD
OT
OT
3
0
21‐Sep‐17
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
0.019%
PIPING ISOMETRICS ‐ LINE NO.:24‐8084‐3''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
PIPING
3963‐KAHM‐8080‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8080‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
3963‐KAHM‐8082‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8082‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
595
8
PIPING
3963‐KAHM‐8621‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8621‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
0.019%
596
8
PIPING
3963‐KAHM‐8620‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8620‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
0.019%
597
8
PIPING
3963‐KAHM‐8622‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8622‐3''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
0.019%
598
8
PIPING
3963‐KAHM‐8623‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8623‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
599
8
PIPING
3963‐KAHM‐8624‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8624‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
0.019%
600
8
PIPING
3963‐KAHM‐8625‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8625‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
0.019%
601
8
PIPING
3963‐KAHM‐1349‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐1349‐6"‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
602
8
PIPING
3963‐KAHM‐1350‐4‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐1350‐4''‐OC‐CS1‐300‐4X
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
603
8
PIPING
3963‐KAHM‐1351‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐1351‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
604
8
PIPING
3963‐KAHM‐8100‐4‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8100‐4"‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
22‐Jul‐19
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
95%
95%
0%
0.019%
0.019%
605
8
PIPING
3963‐KAHM‐8099‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8099‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
22‐Jul‐19
18‐Jan‐18
23‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
95%
95%
0%
0.019%
0.019%
606
8
PIPING
3963‐KAHM‐8626‐8‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8626‐8''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
607
8
PIPING
3963‐KAHM‐8627‐4‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8627‐4''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
608
8
PIPING
3963‐KAHM‐8605‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8605‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
0.019%
609
8
PIPING
3963‐KAHM‐8604‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8604‐8"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
610
8
PIPING
3963‐KAHM‐8602‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8602‐8''‐GP‐CS1‐150‐8X
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
611
8
PIPING
3963‐KAHM‐8603‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8603‐8''‐GP‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
612
8
PIPING
3963‐KAHM‐8608‐2‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8608‐2"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
613
8
PIPING
3963‐KAHM‐8607‐3‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8607‐3"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
22‐Jan‐18
18‐Jan‐18
PIPING
31‐Aug‐17
22‐Jan‐18
22‐Jul‐19
8
21‐Aug‐17
21‐Jan‐18
24‐Jan‐18
8
0.020%
18‐Jan‐18
1‐Apr‐18
593
0
31‐Oct‐18
1‐Apr‐18
594
3
21‐Sep‐17
1‐Apr‐18
0.019%
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
0.019%
0.019%
0.019%
614
8
PIPING
3963‐KAHM‐8606‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8606‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
18‐Jan‐18
20‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.019%
0.019%
615
8
PIPING
3963‐KAHM‐8091‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8091‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
616
8
PIPING
3963‐KAHM‐8093‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8093‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
617
8
PIPING
3963‐KAHM‐8092‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8092‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
618
8
PIPING
3963‐KAHM‐8090‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8090‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
619
8
PIPING
3963‐KAHM‐8089‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8089‐2"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
Page 5 of 13
Page 76 of 170
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC NO
ITEM CODE
DOC DESC
DOC CLASS
CURRENT REVISION
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100%
ACTIAFC
ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
620
8
PIPING
3963‐KAHM‐8088‐1‐OD
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
0.019%
0.019%
621
8
PIPING
3963‐KAHM‐8094‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8094‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
622
8
PIPING
3963‐KAHM‐8096‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8096‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019% 0.019%
SEQ
DISCIPLINE
DOC NO
CURRENT REVISION 0
Original BL WV
ITEM DOC DESC CODE OT PIPING ISOMETRICS ‐ LINE NO.:24‐8088‐1"‐OD‐CS1‐300‐4X
SRN
DOC CLASS 3
SHUTD OWN PACKA GE SHUTD OWN
WV
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PIPING
3963‐KAHM‐8087‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8087‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
0%
0.019%
3963‐KAHM‐8085‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8085‐1"‐OD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
PIPING
3963‐KAHM‐8086‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8086‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
626
8
PIPING
3963‐KAHM‐8095‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8095‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
627
8
PIPING
3963‐KAHM‐8629‐2‐AI
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8629‐2"‐AI‐CS1‐150‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
PIPING
3963‐KAHM‐8176‐4‐WF
PIPING ISOMETRICS ‐ LINE NO.:24‐8176‐4"‐WF‐L5‐150‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
8
PIPING
3963‐KAHM‐8178‐2‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:24‐8178‐2"‐WF‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
8
PIPING
3963‐KAHN‐0170‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐170‐6"‐OC‐CS1‐900‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
631
8
PIPING
3963‐KAHN‐0162‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐162‐6''‐OC‐CS1‐150‐8X
16‐Sep‐17
21‐Sep‐17
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
632
8
PIPING
3963‐KAHN‐0163‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐163‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
633
8
PIPING
3963‐KAHN‐7615‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐7615‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
634
8
PIPING
3963‐KAHN‐0360‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐360‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
635
8
PIPING
3963‐KAHN‐0185‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐185‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
636
8
PIPING
3963‐KAHN‐0186‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐186‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
637
8
PIPING
3963‐KAHN‐0179‐3‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐179‐3''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
638
8
PIPING
3963‐KAHN‐0182‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐182‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
639
8
PIPING
3963‐KAHN‐0183‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐183‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
640
8
PIPING
3963‐KAHN‐0184‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐184‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
641
8
PIPING
3963‐KAHN‐0172‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐172‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
642
8
PIPING
3963‐KAHN‐0175‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐175‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
643
8
PIPING
3963‐KAHN‐0173‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐173‐3''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
644
8
PIPING
3963‐KAHN‐0176‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐176‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
645
8
PIPING
3963‐KAHN‐0174‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐174‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
646
8
PIPING
3963‐KAHN‐0177‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐177‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
647
8
PIPING
3963‐KAHN‐0164‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐164‐6"‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
648
8
PIPING
3963‐KAHN‐0165‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐165‐6"‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
649
8
PIPING
3963‐KAHN‐0168‐4‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐168‐4''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
650
8
PIPING
3963‐KAHN‐0167‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐167‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
651
8
PIPING
3963‐KAHN‐0361‐4‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐361‐4"‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
652
8
PIPING
3963‐KAHN‐0363‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐363‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
653
8
PIPING
3963‐KAHN‐0364‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐364‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
654
8
PIPING
3963‐KAHN‐0179‐8‐GV
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
655
8
PIPING
3963‐KAHN‐0178‐4‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐178‐4''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
656
8
PIPING
3963‐KAHN‐7621‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐7621‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
657
8
PIPING
3963‐KAHN‐7622‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐7622‐8"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
658
8
PIPING
3963‐KAHN‐7917‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐7917‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
659
8
PIPING
3963‐KAHN‐7619‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐7619‐8''‐GP‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
660
8
PIPING
3963‐KAHN‐7616‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐7616‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
661
8
PIPING
3963‐KAHN‐0180‐2‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐180‐2"‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
662
8
PIPING
3963‐KAHN‐7618‐3‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐7618‐3"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
663
8
PIPING
3963‐KAHN‐7620‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐7620‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
18‐Jan‐18
21‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
664
8
PIPING
3963‐KAHN‐0362‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐362‐1''‐OD‐CS1‐300‐4X
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
665
8
PIPING
3963‐KAHN‐0180‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐180‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
666
8
PIPING
3963‐KAHN‐0177‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐177‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
667
8
PIPING
3963‐KAHN‐0175‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐175‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
668
8
PIPING
3963‐KAHN‐0187‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐187‐2"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
669
8
PIPING
3963‐KAHN‐0169‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐169‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
670
8
PIPING
3963‐KAHN‐0178‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐178‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
671
8
PIPING
3963‐KAHN‐0188‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐188‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
672
8
PIPING
3963‐KAHN‐0176‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐176‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
673
8
PIPING
3963‐KAHN‐0174‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐174‐1"‐OD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
674
8
PIPING
3963‐KAHN‐0173‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐173‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
675
8
PIPING
3963‐KAHN‐0181‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐181‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.019%
0.019%
676
8
PIPING
3963‐KAHN‐0484‐2‐AI
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐484‐2"‐AI‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
18‐Jan‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.019%
0.019%
677
8
PIPING
3963‐KAHN‐5001‐4‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐5001‐4"‐WF‐L5‐150‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
21‐Sep‐17
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐179‐8''‐GV‐CS1‐150‐8X
3
3
0
0
0.020%
0.020%
0.020%
21‐Aug‐17
21‐Aug‐17
21‐Aug‐17
31‐Aug‐17
31‐Aug‐17
31‐Aug‐17
5‐Sep‐17
5‐Sep‐17
5‐Sep‐17
16‐Sep‐17
16‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
18‐Jan‐18
22‐Jan‐18
22‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
18‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.019%
0.019%
0.019%
0.019%
8
PIPING
3963‐KAHN‐5003‐2‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:22‐5003‐2"‐WF‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
8
PIPING
3963‐KAHS‐0106‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐106‐6"‐OC‐CS1‐900‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
8
PIPING
3963‐KAHS‐0101‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐101‐6''‐OC‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
681
8
PIPING
3963‐KAHS‐0102‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐102‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
682
8
PIPING
3963‐KAHS‐9775‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9775‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
683
8
PIPING
3963‐KAHS‐9776‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9776‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
3‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
22‐Jul‐19
18‐Jan‐18
3‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
95%
95%
0%
0.019%
0.019%
684
8
PIPING
3963‐KAHS‐9888‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9888‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
685
8
PIPING
3963‐KAHS‐9889‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9889‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
686
8
PIPING
3963‐KAHS‐9884‐3‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9884‐3''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
687
8
PIPING
3963‐KAHS‐9885‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9885‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
688
8
PIPING
3963‐KAHS‐9886‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9886‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
689
8
PIPING
3963‐KAHS‐9887‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9887‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
95%
95%
0%
0.019%
0.019%
690
8
PIPING
3963‐KAHS‐9886‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9886‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
27‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
22‐Jul‐19
18‐Jan‐18
27‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
95%
95%
0%
0.019%
0.019%
691
8
PIPING
3963‐KAHS‐9889‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9889‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
692
8
PIPING
3963‐KAHS‐9887‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9887‐3''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
693
8
PIPING
3963‐KAHS‐9890‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9890‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
694
8
PIPING
3963‐KAHS‐9888‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9888‐6''‐GV‐CS1‐150‐8X
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
695
8
PIPING
3963‐KAHS‐9885‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9885‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
8
PIPING
3963‐KAHS‐0104‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐104‐6"‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
697
8
PIPING
3963‐KAHS‐0103‐4‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐103‐4''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
698
8
PIPING
3963‐KAHS‐0105‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐105‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
699
8
PIPING
3963‐KAHS‐9777‐4‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9777‐4"‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
3‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
22‐Jul‐19
18‐Jan‐18
3‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
95%
95%
0%
0.019%
0.019%
700
8
PIPING
3963‐KAHS‐9778‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9778‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
3‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
22‐Jul‐19
18‐Jan‐18
3‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
4‐Feb‐18
95%
95%
0%
0.019%
0.019%
701
8
PIPING
3963‐KAHS‐9884‐8‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9884‐8''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
702
8
PIPING
3963‐KAHS‐9777‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9777‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
703
8
PIPING
3963‐KAHS‐9776‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9776‐8"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
704
8
PIPING
3963‐KAHS‐9778‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9778‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
705
8
PIPING
3963‐KAHS‐9779‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9779‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
706
8
PIPING
3963‐KAHS‐9893‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9893‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
707
8
PIPING
3963‐KAHS‐9895‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9895‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
8
PIPING
3963‐KAHS‐9892‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9892‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
8
PIPING
3963‐KAHS‐9899‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9899‐2"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
95%
95%
0%
0.019%
0.019%
711
8
PIPING
3963‐KAHS‐9898‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9898‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
PIPING
3963‐KAHS‐9896‐1‐OD
3963‐KAHS‐9897‐1‐OD
OT
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9896‐1"‐OD‐CS1‐300‐4X
PIPING ISOMETRICS ‐ LINE NO.:23‐9897‐1"‐OD‐CS1‐300‐4X
3
3
0
0
0.020%
0.020%
21‐Aug‐17
21‐Aug‐17
31‐Aug‐17
31‐Aug‐17
5‐Sep‐17
5‐Sep‐17
16‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
18‐Jan‐18
28‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
22‐Jul‐19
18‐Jan‐18
18‐Jan‐18
28‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
95%
95%
0%
0%
0.019%
0.019%
709
8
PIPING
5‐Sep‐17
710 712
8
31‐Aug‐17
0.019%
696
708
21‐Aug‐17
1‐Apr‐18
23‐Jan‐18
678
0.020%
1‐Apr‐18
23‐Jan‐18
0.019%
680
0
1‐Apr‐18
23‐Jan‐18
1‐Apr‐18
679
3
1‐Apr‐18
23‐Jan‐18
1‐Apr‐18
0.019%
629
0
1‐Apr‐18
95%
630
3
1‐Apr‐18
22‐Jan‐18
Actual WF
PIPING
1‐Apr‐18
22‐Jan‐18
Plan WF
8
1‐Apr‐18
22‐Jan‐18
ACTIAWH
8
1‐Apr‐18
22‐Jan‐18
ACTIFA
8
1‐Apr‐18
21‐Jan‐18
ACTIFC
623
OT
18‐Jan‐18
ACTD
625
8
22‐Jul‐19
ACTS
624
628
22‐Jan‐18
PLASBUILT
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
0.019%
0.019%
0.019%
713
8
PIPING
3963‐KAHS‐9900‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9900‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
27‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
22‐Jul‐19
18‐Jan‐18
27‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
28‐Jan‐18
95%
95%
0%
0.019%
0.019%
714
8
PIPING
3963‐KAHS‐9894‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9894‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
95%
95%
0%
0.019%
0.019%
715
8
PIPING
3963‐KAHS‐9890‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9890‐1"‐OD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
716
8
PIPING
3963‐KAHS‐9891‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9891‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
30‐Jan‐18
95%
95%
0%
0.019%
0.019%
717
8
PIPING
3963‐KAHS‐9899‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9899‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
18‐Jan‐18
28‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.019%
0.019%
18‐Jan‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Jan‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
718
8
PIPING
3963‐KAHS‐9871‐2‐AI
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐9871‐2"‐AI‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
22‐Jul‐19
95%
95%
0%
0.019%
0.019%
719
8
PIPING
3963‐KAHS‐3083‐4‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐3083‐4"‐WF‐L5‐150‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
720
8
PIPING
3963‐KAHS‐3087‐2‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:23‐3087‐2"‐WF‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
721
8
PIPING
3963‐JALM‐2090‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2090‐6"‐OC‐CS1‐900‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
20‐Feb‐18
20‐Feb‐18
20‐Feb‐18
20‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
20‐Feb‐18
20‐Feb‐18
20‐Feb‐18
20‐Feb‐18
95%
95%
0%
0.019%
0.019%
722
8
PIPING
3963‐JALM‐2037‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2037‐6''‐OC‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
723
8
PIPING
3963‐JALM‐2035‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2035‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
724
8
PIPING
3963‐JALM‐5201‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5201‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
725
8
PIPING
3963‐JALM‐2032‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2032‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
726
8
PIPING
3963‐JALM‐2083‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2083‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
727
8
PIPING
3963‐JALM‐2084‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2084‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
728
8
PIPING
3963‐JALM‐2079‐3‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2079‐3''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
729
8
PIPING
3963‐JALM‐2080‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2080‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
730
8
PIPING
3963‐JALM‐2081‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2081‐1"‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
731
8
PIPING
3963‐JALM‐2082‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2082‐2''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
732
8
PIPING
3963‐JALM‐5210‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5210‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
733
8
PIPING
3963‐JALM‐5213‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5213‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
734
8
PIPING
3963‐JALM‐5211‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5211‐3''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
735
8
PIPING
3963‐JALM‐5214‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5214‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
736
8
PIPING
3963‐JALM‐5212‐6‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5212‐6''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
737
8
PIPING
3963‐JALM‐5215‐10‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5215‐10''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
738
8
PIPING
3963‐JALM‐2086‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2086‐6"‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
739
8
PIPING
3963‐JALM‐2033‐4‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2033‐4''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
740
8
PIPING
3963‐JALM‐2089‐6‐OC
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2089‐6''‐OC‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
741
8
PIPING
3963‐JALM‐2088‐4‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2088‐4"‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
742
8
PIPING
3963‐JALM‐2034‐6‐WD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2034‐6''‐WD‐L5‐300‐1X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
743
8
PIPING
3963‐JALM‐5217‐8‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5217‐8''‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
Page 6 of 13
Page 77 of 170
0.019%
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC NO
ITEM CODE
DOC DESC
DOC CLASS
CURRENT REVISION
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100% ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
PLIAWH
PLIAFC
PLASBUILT
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
ACTS
ACTD
ACTIFC
ACTIFA
ACTIAWH
ACTIAFC
744
8
PIPING
3963‐JALM‐5216‐4‐GV
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
745
8
PIPING
3963‐JALM‐5204‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5204‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
746
8
PIPING
3963‐JALM‐5203‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5203‐8"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
747
8
PIPING
3963‐JALM‐5205‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5205‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
748
8
PIPING
3963‐JALM‐5202‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5202‐8''‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
749
8
PIPING
3963‐JALM‐5207‐8‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5207‐8''‐GP‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
750
8
PIPING
3963‐JALM‐5208‐2‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5208‐2"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
751
8
PIPING
3963‐JALM‐5206‐2‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5206‐2"‐GP‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
752
8
PIPING
3963‐JALM‐5218‐3‐GV
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5218‐3"‐GV‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
753
8
PIPING
3963‐JALM‐5209‐6‐GP
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5209‐6"‐GP‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
754
8
PIPING
3963‐JALM‐2089‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2089‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
755
8
PIPING
3963‐JALM‐2092‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2092‐1''‐OD‐CS1‐150‐8X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
756
8
PIPING
3963‐JALM‐2087‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2087‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
757
8
PIPING
3963‐JALM‐2086‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2086‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
758
8
PIPING
3963‐JALM‐2093‐2‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2093‐2"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
759
8
PIPING
3963‐JALM‐2094‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2094‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
760
8
PIPING
3963‐JALM‐2088‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2088‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
761
8
PIPING
3963‐JALM‐2091‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2091‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
20‐Feb‐18
762
8
PIPING
3963‐JALM‐2090‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2090‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
19‐Feb‐18
763
8
PIPING
3963‐JALM‐2084‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2084‐1''‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
764
8
PIPING
3963‐JALM‐2085‐1‐OD
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2085‐1"‐OD‐CS1‐300‐4X
3
0
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
765
8
PIPING
3963‐JALM‐5212‐2‐AI
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐5212‐2"‐AI‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
766
8
PIPING
3963‐JALM‐2086‐4‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2086‐4"‐WF‐L5‐150‐1X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
SEQ
DISCIPLINE
DOC NO
CURRENT REVISION 0
Original BL WV
ITEM DOC DESC CODE OT PIPING ISOMETRICS ‐ LINE NO.:31‐5216‐4''‐GV‐CS1‐150‐8X
SRN
DOC CLASS 3
SHUTD OWN PACKA GE SHUTD OWN
WV
PLS
PLD
PLIFC
PLIFA
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
Plan WF
Actual WF
0.019%
0.019%
0.019%
0.019%
0%
0.019%
0.019%
95%
0%
0.019%
0.019%
95%
95%
0%
0.019%
0.019%
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
20‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
18‐Jan‐18
19‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.019%
0.019%
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
18‐Jan‐18
20‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.019%
0.019%
31‐Oct‐18
18‐Jan‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
18‐Jan‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.019%
0.019%
21‐Sep‐17
31‐Oct‐18
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
22‐Jul‐19
18‐Jan‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
1‐Apr‐18
0.019%
0.019%
767
8
PIPING
3963‐JALM‐2087‐2‐WF
OT
PIPING ISOMETRICS ‐ LINE NO.:31‐2087‐2"‐WF‐CS1‐150‐4X
3
A
0.020%
21‐Aug‐17
31‐Aug‐17
5‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
1‐Apr‐18
95%
95%
0%
0.019%
0.019%
768
8
PIPING
3963‐KAHN‐5‐52‐0013
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING G.A. AREA 151 SH13 EL.103.590 & ABOVE
1
A
0.028%
31‐Mar‐17
10‐Apr‐17
15‐Apr‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
2‐Jan‐18
1‐Jan‐18
2‐Jan‐18
22‐Jan‐18
4‐Feb‐18
4‐Feb‐18
22‐Jul‐19
2‐Jan‐18
1‐Jan‐18
2‐Jan‐18
22‐Jan‐18
4‐Feb‐18
4‐Feb‐18
95%
95%
0%
0.026%
0.026%
769
8
PIPING
3963‐KAHN‐5‐52‐0014
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING G.A. AREA 151 SH14 EL.103.590 & ABOVE
1
A
0.028%
24‐Jul‐17
26‐Jul‐17
28‐Jul‐17
9‐Aug‐17
21‐Aug‐17
2‐Sep‐17
31‐Oct‐18
29‐Dec‐17
1‐Jan‐18
2‐Jan‐18
22‐Jan‐18
4‐Feb‐18
4‐Feb‐18
22‐Jul‐19
29‐Dec‐17
1‐Jan‐18
2‐Jan‐18
22‐Jan‐18
4‐Feb‐18
4‐Feb‐18
95%
95%
0%
0.026%
0.026%
770
8
PIPING
3963‐KAHN‐5‐52‐0015
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING G.A AREA 151 SH14 MANIFOLD SHUTDOW
1
A
0.028%
24‐Jul‐17
26‐Jul‐17
28‐Jul‐17
9‐Aug‐17
21‐Aug‐17
2‐Sep‐17
31‐Oct‐18
30‐Dec‐17
31‐Dec‐17
2‐Jan‐18
23‐Jan‐18
4‐Feb‐18
4‐Feb‐18
22‐Jul‐19
30‐Dec‐17
31‐Dec‐17
2‐Jan‐18
23‐Jan‐18
4‐Feb‐18
4‐Feb‐18
95%
95%
0%
0.026%
0.026%
771
8
PIPING
3963‐KAHS‐5‐52‐0013
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (23‐S
1
A
0.028%
1‐Aug‐17
6‐Aug‐17
11‐Aug‐17
21‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
2‐Jan‐18
2‐Jan‐18
2‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
2‐Jan‐18
2‐Jan‐18
2‐Jan‐18
29‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.026%
0.026%
772
8
PIPING
DEM‐3963‐KAHN‐5‐52‐0007
DEM
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (22‐S
1
A
0.014%
1‐Aug‐17
6‐Aug‐17
11‐Aug‐17
21‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
7‐Jan‐18
8‐Jan‐18
9‐Jan‐18
25‐Jan‐18
12‐Feb‐18
12‐Feb‐18
22‐Jul‐19
7‐Jan‐18
8‐Jan‐18
9‐Jan‐18
25‐Jan‐18
12‐Feb‐18
12‐Feb‐18
95%
95%
0%
0.013%
773
8
PIPING
DEM‐3963‐KAHM‐5‐52‐0010
DEM
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A MANIFOLD SHUTDOWN VALVES (24‐SD
1
A
0.014%
1‐Aug‐17
6‐Aug‐17
11‐Aug‐17
21‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
31‐Dec‐17
7‐Jan‐18
9‐Jan‐18
25‐Jan‐18
12‐Feb‐18
12‐Feb‐18
22‐Jul‐19
31‐Dec‐17
7‐Jan‐18
9‐Jan‐18
25‐Jan‐18
12‐Feb‐18
12‐Feb‐18
95%
95%
0%
0.013%
0.013%
774
8
PIPING
3963‐FAHN‐5‐36‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPING TIE‐IN SCHEDULE
1
A
0.056%
23‐Jul‐17
2‐Aug‐17
7‐Aug‐17
25‐Aug‐17
4‐Sep‐17
14‐Sep‐17
31‐Oct‐18
27‐Jul‐17
2‐Aug‐17
3‐Aug‐17
29‐Oct‐17
29‐Oct‐17
11‐Jan‐18
22‐Jul‐19
27‐Jul‐17
2‐Aug‐17
3‐Aug‐17
29‐Oct‐17
29‐Oct‐17
11‐Jan‐18
95%
95%
0%
0.053%
0.053%
775
8
PIPING
3963‐FAHN‐5‐57‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PIPE SUPPORT LIST
1
A
0.056%
18‐Jul‐17
28‐Jul‐17
2‐Aug‐17
20‐Aug‐17
30‐Aug‐17
9‐Sep‐17
31‐Oct‐18
15‐Jul‐17
15‐Oct‐17
16‐Oct‐17
4‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
15‐Jul‐17
15‐Oct‐17
16‐Oct‐17
4‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.053%
0.053%
5‐Apr‐17
10‐Apr‐17
776
PIPING
3963‐FAHN‐5‐50‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; PLOT PLAN
1
C
0.112%
26‐Mar‐17
11‐May‐17
1‐Jun‐17
11‐Jun‐17
31‐Oct‐18
29‐Mar‐17
5‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
3‐Sep‐18
22‐Jul‐19
29‐Mar‐17
5‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
3‐Sep‐18
95%
95%
0%
0.106%
0.106%
777
8
PIPING
3963‐FAHN‐5‐50‐0002
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; KEY PLAN
1
A
0.042%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
21‐Jan‐18
22‐Jul‐19
27‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Oct‐17
26‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.040%
0.040%
778
8
PIPING
3963‐FAHS‐5‐57‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PIPE SUPPORT LIST
1
A
0.056%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
8‐Oct‐17
10‐Oct‐17
3‐Jan‐18
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
27‐Jul‐17
8‐Oct‐17
10‐Oct‐17
3‐Jan‐18
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.053%
0.053%
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; PLOT PLAN
10‐Apr‐17
12‐Apr‐17
779
8
0.013%
1
C
0.112%
31‐Mar‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
29‐Mar‐17
23‐Oct‐17
3‐Sep‐18
22‐Jul‐19
29‐Mar‐17
23‐Oct‐17
3‐Sep‐18
780
8
PIPING
3963‐JALM‐5‐57‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPE SUPPORT LIST
1
A
0.056%
24‐Jul‐17
3‐Aug‐17
8‐Aug‐17
26‐Aug‐17
5‐Sep‐17
15‐Sep‐17
31‐Oct‐18
27‐Jul‐17
15‐Oct‐17
16‐Oct‐17
10‐Jan‐18
22‐Jan‐18
22‐Jan‐18
22‐Jul‐19
27‐Jul‐17
15‐Oct‐17
16‐Oct‐17
10‐Jan‐18
22‐Jan‐18
22‐Jan‐18
95%
95%
0%
0.053%
0.053%
781
8
PIPING
3963‐JALM‐5‐50‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PLOT PLAN
1
C
0.112%
1‐Apr‐17
11‐Apr‐17
16‐Apr‐17
17‐May‐17
7‐Jun‐17
17‐Jun‐17
31‐Oct‐18
5‐Apr‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
3‐Sep‐18
22‐Jul‐19
5‐Apr‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
3‐Sep‐18
95%
95%
0%
0.106%
0.106%
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING TIE‐IN SCHEDULE
30‐Aug‐17
17‐Sep‐17
18‐Sep‐17
10‐Dec‐17
17‐Sep‐17
18‐Sep‐17
10‐Dec‐17
782
8
8
PIPING
PIPING
3963‐FAHS‐5‐50‐0001
3963‐KAHM‐5‐36‐0001
OT
OT
18‐Jul‐17
15‐Apr‐17
9‐Sep‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
11‐Jan‐18
23‐Oct‐17
95%
0%
0.106%
0.053%
0.106%
1
A
0.056%
28‐Jul‐17
2‐Aug‐17
20‐Aug‐17
31‐Oct‐18
20‐Jul‐17
22‐Jul‐19
20‐Jul‐17
8
PIPING
3963‐KAHM‐5‐57‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPE SUPPORT LIST
1
A
0.112%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
2‐Oct‐17
3‐Oct‐17
5‐Oct‐17
10‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
2‐Oct‐17
3‐Oct‐17
5‐Oct‐17
10‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.106%
0.106%
PIPING
3963‐KAHM‐5‐17‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING STRESS ANALYSIS REPORT
3
A
0.336%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
25‐Sep‐17
27‐Sep‐17
16‐Oct‐17
29‐Oct‐17
21‐Jan‐18
22‐Jul‐19
1‐Jun‐17
25‐Sep‐17
27‐Sep‐17
16‐Oct‐17
29‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.319%
0.319%
22‐Jul‐19
15‐Mar‐17
0.053%
785
8
PIPING
3963‐KAHM‐5‐50‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PLOT PLAN
1
A
0.112%
30‐Mar‐17
9‐Apr‐17
14‐Apr‐17
15‐May‐17
5‐Jun‐17
15‐Jun‐17
31‐Oct‐18
15‐Mar‐17
5‐Apr‐17
13‐Apr‐17
23‐Oct‐17
13‐Apr‐17
23‐Oct‐17
3‐Sep‐18
95%
95%
0%
0.106%
0.106%
786
8
PIPING
3963‐KAHN‐5‐36‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING TIE‐IN SCHEDULE
1
A
0.056%
19‐Jul‐17
29‐Jul‐17
3‐Aug‐17
21‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
15‐Jul‐17
22‐Sep‐17
24‐Sep‐17
7‐Dec‐17
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
15‐Jul‐17
22‐Sep‐17
24‐Sep‐17
7‐Dec‐17
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
0.053%
0.053%
787
8
PIPING
3963‐KAHN‐5‐57‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPE SUPPORT LIST
1
A
0.056%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
14‐Oct‐17
15‐Oct‐17
16‐Oct‐17
8‐Jan‐18
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
14‐Oct‐17
15‐Oct‐17
16‐Oct‐17
8‐Jan‐18
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.053%
0.053%
788
8
PIPING
3963‐KAHN‐5‐17‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT
3
A
0.420%
5‐Jun‐17
15‐Jun‐17
20‐Jun‐17
21‐Jul‐17
11‐Aug‐17
21‐Aug‐17
31‐Oct‐18
7‐Jun‐17
19‐Sep‐17
20‐Sep‐17
9‐Oct‐17
9‐Oct‐17
21‐Jan‐18
22‐Jul‐19
7‐Jun‐17
19‐Sep‐17
20‐Sep‐17
9‐Oct‐17
9‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.399%
0.399%
789
8
PIPING
3963‐KAHN‐5‐50‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PLOT PLAN
1
A
0.112%
31‐Mar‐17
10‐Apr‐17
15‐Apr‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
12‐Mar‐17
5‐Apr‐17
13‐Apr‐17
23‐Oct‐17
2‐Nov‐17
21‐Jan‐18
22‐Jul‐19
12‐Mar‐17
5‐Apr‐17
13‐Apr‐17
23‐Oct‐17
2‐Nov‐17
21‐Jan‐18
95%
95%
0%
0.106%
0.106%
790
8
PIPING
3963‐KAHN‐5‐52‐0005
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.5 EL.103.590 & ABOVE
1
A
0.070%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
15‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.067%
791
8
PIPING
3963‐KAHN‐5‐52‐0007
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.7 EL.103.590 & ABOVE
1
A
0.084%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
15‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.080%
0.080%
792
8
PIPING
3963‐KAHN‐5‐52‐0010
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 151 SHT.10 EL.103.590 & ABOV
1
A
0.070%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
19‐Jul‐17
9‐Oct‐17
11‐Oct‐17
19‐Nov‐17
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.067%
0.067%
793
8
PIPING
3963‐KAHS‐5‐36‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING TIE‐IN SCHEDULE
1
A
0.056%
22‐Jul‐17
1‐Aug‐17
6‐Aug‐17
24‐Aug‐17
3‐Sep‐17
13‐Sep‐17
31‐Oct‐18
27‐Jul‐17
17‐Sep‐17
18‐Sep‐17
11‐Dec‐17
17‐Jan‐18
17‐Jan‐18
22‐Jul‐19
27‐Jul‐17
17‐Sep‐17
18‐Sep‐17
11‐Dec‐17
17‐Jan‐18
17‐Jan‐18
95%
95%
0%
0.053%
0.053%
7‐Aug‐17
12‐Aug‐17
14‐Oct‐17
15‐Oct‐17
14‐Oct‐17
15‐Oct‐17
794
0.056%
28‐Jul‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
3‐Jan‐18
11‐Jan‐18
3‐Jan‐18
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.053%
0.053%
795
8
PIPING
3963‐KAHS‐5‐17‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING STRESS ANALYSIS REPORT
3
A
0.420%
10‐Jun‐17
20‐Jun‐17
25‐Jun‐17
26‐Jul‐17
16‐Aug‐17
26‐Aug‐17
31‐Oct‐18
8‐Jul‐17
3‐Oct‐17
5‐Oct‐17
23‐Oct‐17
23‐Oct‐17
31‐Jan‐18
22‐Jul‐19
8‐Jul‐17
3‐Oct‐17
5‐Oct‐17
23‐Oct‐17
23‐Oct‐17
31‐Jan‐18
95%
95%
0%
0.399%
0.399%
8
PIPING
3963‐KAHS‐5‐50‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PLOT PLAN
1
A
0.112%
1‐Apr‐17
11‐Apr‐17
16‐Apr‐17
17‐May‐17
7‐Jun‐17
17‐Jun‐17
31‐Oct‐18
14‐Mar‐17
5‐Apr‐17
13‐Apr‐17
23‐Oct‐17
2‐Nov‐17
21‐Jan‐18
22‐Jul‐19
14‐Mar‐17
5‐Apr‐17
13‐Apr‐17
23‐Oct‐17
2‐Nov‐17
21‐Jan‐18
95%
95%
0%
0.106%
0.106%
31‐Oct‐18
3963‐FAHM‐5‐36‐0001
OT
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPE SUPPORT LIST
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING TIE‐IN SCHEDULE
1
1
A
A
0.056%
26‐Jul‐17
5‐Aug‐17
10‐Aug‐17
28‐Aug‐17
7‐Sep‐17
17‐Sep‐17
17‐Jul‐17
13‐Nov‐17
17‐Jul‐17
13‐Nov‐17
PIPING
3963‐FAHM‐5‐57‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPE SUPPORT LIST
1
A
0.084%
28‐Jul‐17
7‐Aug‐17
12‐Aug‐17
30‐Aug‐17
9‐Sep‐17
19‐Sep‐17
31‐Oct‐18
2‐Oct‐17
3‐Oct‐17
5‐Oct‐17
20‐Dec‐17
21‐Jan‐18
21‐Jan‐18
22‐Jul‐19
2‐Oct‐17
3‐Oct‐17
5‐Oct‐17
20‐Dec‐17
21‐Jan‐18
21‐Jan‐18
95%
95%
0%
0.080%
0.080%
3963‐FAHM‐5‐50‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PLOT PLAN
1
A
0.112%
31‐Mar‐17
10‐Apr‐17
15‐Apr‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
29‐Mar‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
25‐Jan‐18
22‐Jul‐19
29‐Mar‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
25‐Jan‐18
95%
95%
0%
0.106%
0.106%
26‐Aug‐17
31‐Oct‐18
15‐Mar‐17
22‐Jul‐19
15‐Mar‐17
15‐Jul‐17
16‐Jul‐17
3963‐FAHM‐5‐50‐0003
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; KEY PLAN
1
A
0.056%
20‐Jun‐17
5‐Jul‐17
5‐Aug‐17
16‐Jul‐17
26‐Oct‐17
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN
1
A
0.056%
31‐Mar‐17
10‐Apr‐17
15‐Apr‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
6‐Mar‐18
22‐Jul‐19
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
6‐Mar‐18
95%
95%
0%
0.053%
0.053%
3963‐KAHN‐5‐51‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; EQUIPMENT LOCATION PLAN
1
A
0.056%
31‐Mar‐17
10‐Apr‐17
15‐Apr‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
21‐Jan‐18
22‐Jul‐19
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
23‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.053%
0.053%
6‐Jun‐17
31‐Oct‐18
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
1‐Nov‐17
21‐Jan‐18
22‐Jul‐19
0.053%
0.053%
PIPING
3963‐KAHS‐5‐51‐0001
10‐Apr‐17
15‐Apr‐17
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
23‐Oct‐17
1‐Nov‐17
21‐Jan‐18
95%
95%
0%
0.053%
0.053%
804
8
PIPING
3963‐FAHM‐5‐51‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN
1
A
0.056%
31‐Mar‐17
10‐Apr‐17
15‐Apr‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
24‐Oct‐17
24‐Oct‐17
25‐Jan‐18
22‐Jul‐19
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
24‐Oct‐17
24‐Oct‐17
25‐Jan‐18
95%
95%
0%
0.053%
0.053%
8
PIPING
3963‐FAHN‐5‐51‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; EQUIPMENT LOCATION PLAN
1
A
0.056%
31‐Mar‐17
10‐Apr‐17
15‐Apr‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
24‐Oct‐17
24‐Oct‐17
21‐Jan‐18
22‐Jul‐19
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
24‐Oct‐17
24‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.053%
0.053%
806
8
PIPING
3963‐FAHS‐5‐51‐0001
OT
21‐Jan‐18
22‐Jul‐19
DUKHAN FIELD ‐ FAHAHIL SOUTH DEGASSING STATION; EQUIPMENT LOCATION PLAN
1
A
0.056%
31‐Mar‐17
15‐Apr‐17
16‐May‐17
16‐Jun‐17
31‐Oct‐18
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
24‐Oct‐17
24‐Oct‐17
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
24‐Oct‐17
24‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.053%
0.053%
807
8
PIPING
3963‐JALM‐5‐51‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; EQUIPMENT LOCATION PLAN
1
A
0.056%
31‐Mar‐17
10‐Apr‐17
15‐Apr‐17
16‐May‐17
6‐Jun‐17
16‐Jun‐17
31‐Oct‐18
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
24‐Oct‐17
24‐Oct‐17
4‐Mar‐18
22‐Jul‐19
9‐Apr‐17
12‐Apr‐17
13‐Apr‐17
24‐Oct‐17
24‐Oct‐17
4‐Mar‐18
95%
95%
0%
0.053%
0.053%
808
8
PIPING
3963‐DGEN‐5‐17‐0002
OT
DUKHAN FIELD; TECHNICAL BID EVALUATION FOR PIPING BULK ITEMS
1
A
1.270%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
4‐Dec‐17
6‐Dec‐17
18‐Jan‐18
29‐Jan‐18
29‐Jan‐18
22‐Jul‐19
19‐Oct‐17
4‐Dec‐17
6‐Dec‐17
18‐Jan‐18
29‐Jan‐18
29‐Jan‐18
95%
95%
0%
1.206%
1.206%
809
8
PIPING
3963‐DGEN‐5‐57‐0001
OT
DUKHAN FIELD ‐ STANDARD PIPE SUPPORT DETAILS
1
A
0.168%
21‐Jul‐17
31‐Jul‐17
5‐Aug‐17
23‐Aug‐17
2‐Sep‐17
12‐Sep‐17
31‐Oct‐18
27‐Jul‐17
10‐Oct‐17
12‐Oct‐17
21‐Jan‐18
1‐Feb‐18
1‐Feb‐18
22‐Jul‐19
27‐Jul‐17
10‐Oct‐17
12‐Oct‐17
21‐Jan‐18
1‐Feb‐18
1‐Feb‐18
95%
95%
0%
0.160%
0.160%
810
8
PIPING
3963‐FAHN‐5‐52‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.1 PIPING GA EL.21.600 TO 24.050
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
11‐Dec‐17
13‐Dec‐17
7‐Feb‐18
28‐Feb‐18
28‐Feb‐18
22‐Jul‐19
19‐Oct‐17
11‐Dec‐17
13‐Dec‐17
7‐Feb‐18
28‐Feb‐18
28‐Feb‐18
95%
95%
0%
0.093%
811
8
PIPING
3963‐FAHN‐5‐52‐0002
OT
DUKHAN FIELD ‐ FAHAHIL NORTH DEGASSING STATION; AREA 401, SHT.2 PIPING GA EL.24.050 & ABOVE
1
A
0.098%
5‐Aug‐17
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
10‐Dec‐17
13‐Dec‐17
12‐Feb‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
19‐Oct‐17
10‐Dec‐17
13‐Dec‐17
12‐Feb‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.093%
0.093%
812
8
PIPING
3963‐JALM‐5‐52‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.1 EL.63.000 TO 67.000
1
1
0.140%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
26‐Dec‐17
28‐Dec‐17
4‐Mar‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
8‐Jul‐17
26‐Dec‐17
28‐Dec‐17
4‐Mar‐18
22‐Mar‐18
22‐Mar‐18
95%
95%
0%
0.133%
0.133%
813
8
PIPING
3963‐JALM‐5‐52‐0002
OT
DUKHAN FIELD ‐ JALEHA MAIN DEGASSING STATION; PIPING G.A. AREA 803, SHT.2 EL.67.000 TO OVER
1
1
0.140%
11‐Jul‐17
21‐Jul‐17
26‐Jul‐17
26‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
8‐Jul‐17
30‐Dec‐17
2‐Jan‐18
6‐Mar‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
8‐Jul‐17
30‐Dec‐17
2‐Jan‐18
6‐Mar‐18
22‐Mar‐18
22‐Mar‐18
95%
95%
0%
0.133%
0.133%
814
8
PIPING
3963‐KAHM‐5‐52‐0001
OT
1
31‐May‐17
10‐Jun‐17
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.1 EL.101.523 & ABOVE
1
31‐Oct‐18
31‐May‐17
7‐Dec‐17
9‐Dec‐17
25‐Jan‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
31‐May‐17
7‐Dec‐17
9‐Dec‐17
25‐Jan‐18
18‐Mar‐18
95%
95%
0%
0.143%
0.143%
815
8
PIPING
3963‐KAHM‐5‐52‐0003
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.3 EL. 99.143 TO 101.523
1
A
0.151%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
8‐Dec‐17
10‐Dec‐17
21‐Jan‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
31‐May‐17
8‐Dec‐17
10‐Dec‐17
21‐Jan‐18
22‐Mar‐18
22‐Mar‐18
95%
95%
0%
0.143%
0.143%
8
PIPING
3963‐KAHM‐5‐52‐0005
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.5 EL. 99.143 & ABOVE
1
A
0.151%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
7‐Dec‐17
9‐Dec‐17
25‐Jan‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
31‐May‐17
7‐Dec‐17
9‐Dec‐17
25‐Jan‐18
22‐Mar‐18
22‐Mar‐18
95%
95%
0%
0.143%
0.143%
817
8
PIPING
3963‐KAHM‐5‐52‐0008
OT
DUKHAN FIELD ‐ KHATIYAH MAIN DEGASSING STATION; PIPING G.A AREA 255 SHT.8 EL.99.863 & ABOVE
1
0.075%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
24‐Oct‐17
26‐Oct‐17
21‐Jan‐18
12‐Feb‐18
12‐Feb‐18
22‐Jul‐19
1‐Jun‐17
24‐Oct‐17
26‐Oct‐17
21‐Jan‐18
12‐Feb‐18
12‐Feb‐18
95%
0%
0.072%
0.072%
818
8
PIPING
3963‐KAHN‐5‐52‐0002
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.2 EL.105.500 & ABOVE
1
A
0.529%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Jul‐17
28‐Nov‐17
30‐Nov‐17
17‐Jan‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
19‐Jul‐17
28‐Nov‐17
30‐Nov‐17
17‐Jan‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.503%
819
8
PIPING
3963‐KAHN‐5‐52‐0003
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.3 EL.103.590 TO EL.105
1
A
0.084%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
15‐Jul‐17
8‐Dec‐17
10‐Dec‐17
25‐Jan‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
15‐Jul‐17
8‐Dec‐17
10‐Dec‐17
25‐Jan‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.080%
0.080%
820
8
PIPING
3963‐KAHN‐5‐52‐0004
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.4 EL.105.500 & ABOVE
1
A
0.070%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
20‐Jul‐17
28‐Nov‐17
30‐Nov‐17
25‐Jan‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
20‐Jul‐17
28‐Nov‐17
30‐Nov‐17
25‐Jan‐18
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.067%
0.067%
821
8
PIPING
3963‐KAHS‐5‐52‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.1 EL.26.000 TO 28.380
1
1
0.098%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
29‐Jun‐17
12‐Dec‐17
14‐Dec‐17
21‐Jan‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
29‐Jun‐17
12‐Dec‐17
14‐Dec‐17
21‐Jan‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.093%
0.093%
822
8
PIPING
3963‐KAHS‐5‐52‐0002
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.2 EL.26.000 TO 28.380
1
1
0.140%
25‐Jun‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
29‐Jun‐17
18‐Dec‐17
20‐Dec‐17
21‐Jan‐18
29‐Jun‐17
18‐Dec‐17
20‐Dec‐17
21‐Jan‐18
18‐Mar‐18
18‐Mar‐18
823
8
PIPING
3963‐KAHS‐5‐52‐0003
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; PIPING G.A AREA 300 SHT.3 EL.28.380 & ABOVE
1
1
0.084%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
29‐Jun‐17
11‐Dec‐17
13‐Dec‐17
21‐Jan‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
29‐Jun‐17
11‐Dec‐17
13‐Dec‐17
21‐Jan‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.080%
0.080%
824
8
PIPING
3963‐FAHM‐5‐52‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.1 EL.60.600 TO 63.050
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
4‐Dec‐17
6‐Dec‐17
1‐Feb‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
19‐Oct‐17
4‐Dec‐17
6‐Dec‐17
1‐Feb‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.093%
0.093%
825
8
PIPING
3963‐FAHM‐5‐52‐0002
OT
DUKHAN FIELD ‐ FAHAHIL MAIN DEGASSING STATION; PIPING GA AREA 655 SHT.2 EL.63.050 & ABOVE
1
B
0.098%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
3‐Dec‐17
5‐Dec‐17
5‐Feb‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
19‐Oct‐17
3‐Dec‐17
5‐Dec‐17
5‐Feb‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.093%
0.093%
826
15‐Jan‐18
21‐Feb‐18
21‐Feb‐18
5‐Jul‐17
10‐Jul‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
22‐Jul‐19
3963‐KAHN‐5‐52‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH DEGASSING STATION; PIPING GA AREA 103 SHT.1 EL.103.590 TO EL.105
1
A
0.423%
15‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
30‐Nov‐17
15‐Jan‐18
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
3963‐DGEN‐5‐14‐0007
OT
TECHNICAL SPECIFICATION FOR NEW 3 PHASE TEST SEPARATOR
1
A
0.125%
11‐Apr‐17
21‐Apr‐17
26‐Apr‐17
27‐May‐17
17‐Jun‐17
27‐Jun‐17
31‐Oct‐18
5‐Apr‐17
25‐Apr‐17
27‐Apr‐17
22‐Jun‐17
2‐Aug‐17
3‐Aug‐17
22‐Jul‐19
5‐Apr‐17
25‐Apr‐17
27‐Apr‐17
22‐Jun‐17
2‐Aug‐17
3‐Aug‐17
95%
95%
0%
0.119%
0.119%
MECHANICAL
3963‐DGEN‐5‐15‐0005
OT
MATERIAL REQUISITION FOR SEPARATOR EQUIPMENT
1
A
0.083%
30‐Apr‐17
10‐May‐17
15‐May‐17
15‐Jun‐17
6‐Jul‐17
16‐Jul‐17
31‐Oct‐18
11‐May‐17
24‐May‐17
25‐May‐17
27‐Jun‐17
30‐Jul‐17
31‐Jul‐17
22‐Jul‐19
11‐May‐17
24‐May‐17
25‐May‐17
27‐Jun‐17
30‐Jul‐17
31‐Jul‐17
95%
95%
0%
0.079%
0.079%
16‐Sep‐17
MECHANICAL
3963‐DGEN‐5‐17‐0005
4‐Sep‐17
13‐Sep‐17
3‐Aug‐17
8‐Aug‐17
10‐Aug‐17
22‐Aug‐17
1‐Oct‐17
3‐Aug‐17
8‐Aug‐17
10‐Aug‐17
22‐Aug‐17
1‐Oct‐17
6
MECHANICAL
3963‐DGEN‐5‐13‐0007
OT
MECHANICAL DATA SHEETS FOR SEPARATOR EQUIPMENT
1
A
0.125%
23‐Apr‐17
3‐May‐17
8‐May‐17
8‐Jun‐17
29‐Jun‐17
9‐Jul‐17
31‐Oct‐18
27‐Apr‐17
23‐May‐17
25‐May‐17
27‐Jun‐17
2‐Aug‐17
3‐Aug‐17
22‐Jul‐19
27‐Apr‐17
23‐May‐17
25‐May‐17
27‐Jun‐17
2‐Aug‐17
3‐Aug‐17
95%
95%
0%
0.119%
0.119%
MECHANICAL
3963‐DGEN‐5‐14‐0008
OT
SPECIFICATION FOR PRESSURE RELIEF VALVES
1
A
0.125%
11‐May‐17
23‐May‐17
28‐May‐17
28‐Jun‐17
19‐Jul‐17
29‐Jul‐17
31‐Oct‐18
24‐Apr‐17
29‐Apr‐17
2‐May‐17
6‐Jun‐17
6‐Jun‐17
14‐Sep‐17
22‐Jul‐19
24‐Apr‐17
29‐Apr‐17
2‐May‐17
6‐Jun‐17
6‐Jun‐17
14‐Sep‐17
95%
95%
0%
0.119%
0.119%
0.083%
11‐May‐17
7‐May‐17
9‐May‐17
10‐May‐17
7‐May‐17
9‐May‐17
10‐May‐17
3963‐DGEN‐5‐17‐0007
OT
MATERIAL SELECTION REPORT (SEPARATORS)
OT
DATA SHEET FOR PRESSURE RELIEF VALVES (KAHM)
1
A
0.125%
6‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
22‐Jul‐19
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
95%
95%
0%
0.119%
0.119%
3963‐KAHN‐5‐13‐0001
OT
DATA SHEET FOR PRESSURE RELIEF VALVES (KAHN)
1
A
0.125%
6‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
22‐Jul‐19
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
95%
95%
0%
0.119%
0.119%
835
6
MECHANICAL
3963‐KAHS‐5‐13‐0001
OT
DATA SHEET FOR PRESSURE RELIEF VALVES (KAHS)
1
A
0.125%
6‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
22‐Jul‐19
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
95%
95%
0%
0.119%
0.119% 0.119%
26‐Jul‐17
22‐Jul‐19
5‐Jun‐17
25‐Jul‐17
26‐Jul‐17
95%
95%
0%
0.079%
0.079%
836
6
MECHANICAL
3963‐FAHM‐5‐13‐0001
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
22‐Jul‐19
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
95%
95%
0%
0.119%
837
6
MECHANICAL
3963‐FAHN‐5‐13‐0001
OT
DATA SHEET FOR PRESSURE RELIEF VALVES (FAHN)
1
A
0.125%
6‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
22‐Jul‐19
10‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
95%
95%
0%
0.119%
838
6
MECHANICAL
3963‐FAHS‐5‐13‐0001
OT
DATA SHEET FOR PRESSURE RELIEF VALVES (FAHS)
1
A
0.125%
6‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
25‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
22‐Jul‐19
25‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
95%
95%
0%
0.119%
0.119%
839
6
MECHANICAL
3963‐JALM‐5‐13‐0001
OT
DATA SHEET FOR PRESSURE RELIEF VALVES (JALM)
1
A
0.125%
6‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
25‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
22‐Jul‐19
25‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Sep‐17
20‐Sep‐17
2‐Nov‐17
95%
95%
0%
0.119%
0.119%
840
6
MECHANICAL
3963‐DGEN‐5‐15‐0006
OT
MATERIAL REQUISITION FOR PRESSURE RELIEF VALVES
1
A
0.069%
3‐Jun‐17
13‐Jun‐17
18‐Jun‐17
19‐Jul‐17
9‐Aug‐17
19‐Aug‐17
31‐Oct‐18
8‐Jun‐17
20‐Jun‐17
22‐Jun‐17
18‐Aug‐17
18‐Oct‐17
19‐Oct‐17
22‐Jul‐19
8‐Jun‐17
20‐Jun‐17
22‐Jun‐17
18‐Aug‐17
18‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.066%
0.066%
841
6
MECHANICAL
A
26‐Nov‐17
26‐Dec‐17
26‐Dec‐17
22‐Jul‐19
19‐Oct‐17
24‐Nov‐17
26‐Nov‐17
26‐Dec‐17
TECHNICAL BID EVALUATION FOR PRESSURE RELIEF VALVES
1
842
3
MECHANICAL
3963‐DGEN‐5‐00‐0002
OT
MISCELLANEOUS ‐ MECHANICAL
0
843
3
ELECTRICAL
3963‐DGEN‐2‐14‐0001
OT
SPECIFICATION FOR ELECTRICAL POWER, CONTROL CABLES
1
3963‐DGEN‐2‐14‐0002
OT
SPECIFICATION FOR ELECTRICAL BULK MATERIALS
844
A
15‐Aug‐17
20‐Aug‐17
9‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
24‐Nov‐17
26‐Dec‐17
95%
95%
0%
0.230%
0.230%
0.022%
0.242%
14‐Sep‐17
14‐Sep‐17
14‐Sep‐17
14‐Sep‐17
14‐Sep‐17
14‐Sep‐17
14‐Sep‐17
1‐Feb‐18
6‐Feb‐18
1‐Mar‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
22‐Jul‐19
1‐Feb‐18
6‐Feb‐18
1‐Mar‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
95%
95%
0%
0.021%
0.021%
0.111%
17‐Mar‐17
27‐Mar‐17
1‐Apr‐17
2‐May‐17
23‐May‐17
2‐Jun‐17
31‐Oct‐18
15‐Mar‐17
4‐Apr‐17
12‐Apr‐17
26‐Apr‐17
23‐May‐17
23‐May‐17
22‐Jul‐19
15‐Mar‐17
4‐Apr‐17
12‐Apr‐17
26‐Apr‐17
23‐May‐17
23‐May‐17
95%
95%
0%
0.106%
0.106%
0.111%
5‐Aug‐17
9‐Apr‐17
26‐Dec‐17
25‐Mar‐17
4‐Apr‐17
10‐May‐17
31‐May‐17
31‐Oct‐18
29‐Mar‐17
3‐Apr‐17
12‐Apr‐17
26‐Apr‐17
26‐Apr‐17
26‐Apr‐17
22‐Jul‐19
29‐Mar‐17
3‐Apr‐17
12‐Apr‐17
26‐Apr‐17
26‐Apr‐17
26‐Apr‐17
3
ELECTRICAL
3963‐DGEN‐2‐13‐0001
OT
DATA SHEET FOR LV CABLES & EARTHING CABLES
1
A
0.097%
17‐Mar‐17
27‐Mar‐17
1‐Apr‐17
2‐May‐17
23‐May‐17
2‐Jun‐17
31‐Oct‐18
15‐Mar‐17
3‐Apr‐17
5‐Apr‐17
26‐Apr‐17
7‐May‐17
7‐May‐17
22‐Jul‐19
15‐Mar‐17
3‐Apr‐17
5‐Apr‐17
26‐Apr‐17
7‐May‐17
7‐May‐17
95%
95%
0%
0.092%
0.092%
ELECTRICAL
3963‐DGEN‐2‐80‐0001
OT
TYPICAL INSTALLATION DETAILS DRAWINGS FOR POWER
1
A
0.153%
29‐Mar‐17
8‐Apr‐17
13‐Apr‐17
14‐May‐17
4‐Jun‐17
14‐Jun‐17
31‐Oct‐18
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
26‐Apr‐17
7‐May‐17
7‐May‐17
22‐Jul‐19
4‐Apr‐17
6‐Apr‐17
9‐Apr‐17
26‐Apr‐17
7‐May‐17
7‐May‐17
95%
95%
0%
0.145%
0.145%
0.106%
3963‐DGEN‐2‐80‐0002
OT
TYPICAL INSTALLATION DETAILS DRAWINGS FOR EARTHING
1
A
0.153%
29‐Mar‐17
8‐Apr‐17
13‐Apr‐17
14‐May‐17
14‐Jun‐17
31‐Oct‐18
9‐Apr‐17
3‐May‐17
3‐May‐17
3‐May‐17
22‐Jul‐19
9‐Apr‐17
3‐May‐17
3‐May‐17
3‐May‐17
95%
95%
0%
0.145%
0.145%
ELECTRICAL
3963‐DGEN‐2‐80‐0003
OT
TYPICAL INSTALLATION DETAILS DRAWINGS FOR LIGHTING
1
A
0.153%
5‐Apr‐17
15‐Apr‐17
20‐Apr‐17
21‐May‐17
11‐Jun‐17
21‐Jun‐17
31‐Oct‐18
5‐Apr‐17
6‐Apr‐17
9‐Apr‐17
3‐May‐17
3‐May‐17
3‐May‐17
22‐Jul‐19
5‐Apr‐17
6‐Apr‐17
9‐Apr‐17
3‐May‐17
3‐May‐17
3‐May‐17
95%
95%
0%
0.145%
0.145%
ELECTRICAL
3963‐KAHM‐2‐34‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 ELECTRICAL LOAD SCHEDULE
1
B
0.097%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
23‐Aug‐17
10‐Sep‐17
17‐Sep‐17
31‐Oct‐18
6‐May‐17
8‐May‐17
9‐May‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
22‐Jul‐19
6‐May‐17
8‐May‐17
9‐May‐17
5‐Oct‐17
5‐Oct‐17
5‐Oct‐17
95%
95%
0%
0.092%
0.092%
850
3
ELECTRICAL
3963‐KAHM‐2‐36‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 ELECTRICAL TIE‐IN SCHEDULE
1
A
0.083%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
31‐Oct‐18
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
4‐Dec‐17
22‐Jul‐19
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
4‐Dec‐17
95%
95%
0%
0.079%
0.079%
851
3
ELECTRICAL
3963‐KAHM‐2‐37‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 ELECTRICAL CABLE SCHEDULE
1
A
0.097%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
25‐May‐17
29‐May‐17
30‐May‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
22‐Jul‐19
25‐May‐17
29‐May‐17
30‐May‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
95%
95%
0%
0.092%
0.092%
852
3
ELECTRICAL
3963‐KAHM‐2‐54‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 24MCC‐2601 MOTOR CONTROL CENTER SINGLE LINE DIAGRAM
1
B
0.097%
8‐Jun‐17
18‐Jun‐17
23‐Jun‐17
24‐Jul‐17
14‐Aug‐17
24‐Aug‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
12‐Jun‐17
24‐Sep‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
12‐Jun‐17
24‐Sep‐17
95%
95%
0%
0.092%
0.092%
853
3
ELECTRICAL
3963‐KAHM‐2‐54‐0002
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 24‐DB‐2604 DISTRIBUTION BOARD SINGLE LINE DIAGRAM‐415V
1
A
0.097%
8‐Jun‐17
18‐Jun‐17
23‐Jun‐17
24‐Jul‐17
14‐Aug‐17
24‐Aug‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
3‐Aug‐17
22‐Aug‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
3‐Aug‐17
22‐Aug‐17
95%
95%
0%
0.092%
0.092%
854
3
ELECTRICAL
3963‐KAHM‐2‐54‐0003
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 24UPS‐2605(CLASS A UPS) S.L.D INSTRUMENT UPS 240V A.C.
1
A
0.097%
8‐Jun‐17
18‐Jun‐17
23‐Jun‐17
24‐Jul‐17
14‐Aug‐17
24‐Aug‐17
31‐Oct‐18
10‐May‐17
11‐May‐17
11‐May‐17
5‐Jun‐17
13‐Jun‐17
24‐Sep‐17
22‐Jul‐19
10‐May‐17
11‐May‐17
11‐May‐17
5‐Jun‐17
13‐Jun‐17
24‐Sep‐17
95%
95%
0%
0.092%
855
3
ELECTRICAL
3963‐KAHM‐2‐64‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 CABLE ROUTING LAYOUT
1
A
0.111%
30‐Jun‐17
10‐Jul‐17
15‐Jul‐17
15‐Aug‐17
5‐Sep‐17
15‐Sep‐17
31‐Oct‐18
17‐Jun‐17
18‐Jun‐17
19‐Jun‐17
2‐Aug‐17
3‐Aug‐17
2‐Nov‐17
22‐Jul‐19
17‐Jun‐17
18‐Jun‐17
19‐Jun‐17
2‐Aug‐17
3‐Aug‐17
2‐Nov‐17
95%
95%
0%
0.106%
0.106%
856
3
ELECTRICAL
3963‐KAHM‐2‐65‐0002
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 EARTHING LAYOUT
1
A
0.097%
30‐Jun‐17
10‐Jul‐17
15‐Jul‐17
15‐Aug‐17
5‐Sep‐17
15‐Sep‐17
31‐Oct‐18
2‐Jul‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
20‐Sep‐17
20‐Sep‐17
22‐Jul‐19
2‐Jul‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
20‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.092%
0.092%
857
3
ELECTRICAL
3963‐KAHM‐2‐67‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 LIGHTING LAYOUT
0.097%
30‐Jun‐17
10‐Jul‐17
15‐Jul‐17
15‐Aug‐17
31‐Oct‐18
27‐May‐17
27‐May‐17
28‐May‐17
22‐Jun‐17
2‐Aug‐17
3‐Aug‐17
22‐Jul‐19
27‐May‐17
27‐May‐17
28‐May‐17
22‐Jun‐17
2‐Aug‐17
3‐Aug‐17
95%
95%
0%
0.092%
0.092%
858
3
ELECTRICAL
3963‐KAHM‐2‐31‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C
3
A
0.097%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
2‐Oct‐17
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
2‐Oct‐17
95%
95%
0%
0.092%
0.092%
859
3
ELECTRICAL
3963‐KAHM‐2‐31‐0002
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING,
3
A
0.083%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Feb‐18
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Feb‐18
95%
95%
0%
0.079%
0.079%
860
3
ELECTRICAL
3963‐KAHM‐2‐17‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 POWER ADEQUACY REPORT
1
A
0.153%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
22‐Nov‐17
22‐Jul‐19
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
22‐Nov‐17
95%
95%
0%
0.145%
861
3
ELECTRICAL
3963‐KAHM‐2‐12‐0001
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 LV CABLE SIZING CALCULATION
1
B
0.111%
8‐Apr‐17
18‐Apr‐17
23‐Apr‐17
24‐May‐17
14‐Jun‐17
24‐Jun‐17
31‐Oct‐18
19‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
5‐Oct‐17
22‐Jul‐19
19‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
5‐Oct‐17
95%
95%
0%
0.106%
0.106%
862
3
ELECTRICAL
3963‐KAHM‐2‐12‐0002
OT
DUKHAN FIELD ‐ KHATIYAH MAIN UNIT 24 LIGHTING CALCULATION
1
B
0.111%
18‐May‐17
28‐May‐17
2‐Jun‐17
3‐Jul‐17
24‐Jul‐17
3‐Aug‐17
31‐Oct‐18
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
19‐Jun‐17
19‐Jun‐17
19‐Jun‐17
22‐Jul‐19
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
19‐Jun‐17
19‐Jun‐17
19‐Jun‐17
95%
95%
0%
0.106%
0.106%
863
3
ELECTRICAL
3963‐KAHN‐2‐34‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 ELECTRICAL LOAD SCHEDULE
1
A
0.097%
18‐Jul‐17
28‐Jul‐17
2‐Aug‐17
20‐Aug‐17
30‐Aug‐17
9‐Sep‐17
31‐Oct‐18
4‐May‐17
3‐May‐17
4‐May‐17
5‐Jul‐17
13‐Jul‐17
18‐Sep‐17
22‐Jul‐19
4‐May‐17
3‐May‐17
4‐May‐17
5‐Jul‐17
13‐Jul‐17
18‐Sep‐17
95%
95%
0%
0.092%
0.092%
5‐Sep‐17
15‐Sep‐17
5‐Apr‐17
0.106%
3
A
2‐Apr‐17
0%
3
31‐Jul‐17
5‐Apr‐17
95%
848
21‐Jul‐17
2‐Apr‐17
95%
849
1
4‐Jun‐17
10‐Jun‐17
26‐Dec‐17
3
ELECTRICAL
1
A
845
3
ELECTRICAL
OT
0.119%
846 847
3
3963‐DGEN‐5‐17‐0008
23‐Jun‐17
25‐Jul‐17
0.158%
3963‐KAHM‐5‐13‐0001
23‐May‐17
5‐Jun‐17
0.158%
MECHANICAL
18‐May‐17
31‐Oct‐18
0%
MECHANICAL
6‐May‐17
29‐Jul‐17
95%
MECHANICAL
0.125%
19‐Jul‐17
95%
6
A
28‐Jun‐17
1‐Oct‐17
6
1
28‐May‐17
22‐Jul‐19
833
DATA SHEET FOR PRESSURE RELIEF VALVES (FAHM)
23‐May‐17
1‐Oct‐17
834
OT
A
31‐Oct‐18
0.402%
6
1
15‐Aug‐17
0.402%
830
6
10‐Aug‐17
0%
831 832
31‐Jul‐17
95%
0.133%
MECHANICAL
0.167%
95%
0.133%
PIPING
A
30‐Nov‐17
0%
6
1
28‐Nov‐17
95%
6
TECHNICAL BID EVALUATION FOR SEPARATOR EQUIPMENT
15‐Jul‐17
95%
0.503%
8
OT
28‐Nov‐17
18‐Mar‐18
95%
828
6
15‐Jul‐17
18‐Mar‐18
18‐Mar‐18
827 829
25‐Jul‐17
15‐Jun‐17
0.093%
816
A
0.151%
6‐Jun‐17
16‐Jun‐17
0%
805
10‐Apr‐17
16‐May‐17
95%
0.053%
3963‐KAHM‐5‐51‐0001
31‐Mar‐17
95%
0.053%
PIPING
0.056%
21‐Jan‐18
0%
PIPING
A
26‐Oct‐17
95%
PIPING
1
26‐Oct‐17
95%
8
DUKHAN FIELD ‐ KHATIYAH SOUTH DEGASSING STATION; EQUIPMENT LOCATION PLAN
16‐Jul‐17
21‐Jan‐18
8
OT
15‐Jul‐17
21‐Jan‐18
801
8
21‐Jan‐18
22‐Jul‐19
802 803
26‐Oct‐17
21‐Jan‐18
16‐Oct‐17
PIPING
15‐Jul‐17
21‐Jan‐18
22‐Jul‐19
8
5‐Sep‐17
16‐Jul‐17
11‐Jan‐18
8
30‐Jun‐17
15‐Jul‐17
16‐Oct‐17
798
8
PIPING
3963‐KAHS‐5‐57‐0001
799 800
8
PIPING
0.067%
796 797
8
2‐Nov‐17
95%
0%
8
5‐Apr‐17
11‐Jan‐18
95%
783
3‐Sep‐18
11‐Jan‐18
95%
784
2‐Nov‐17
11‐Jan‐18
13‐Apr‐17
0.092%
0.145%
864
3
ELECTRICAL
3963‐KAHN‐2‐36‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 ELECTRICAL TIE‐IN SCHEDULE
1
A
0.097%
28‐May‐17
7‐Jun‐17
12‐Jun‐17
13‐Jul‐17
3‐Aug‐17
13‐Aug‐17
31‐Oct‐18
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
25‐Sep‐17
22‐Jul‐19
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
25‐Sep‐17
95%
95%
0%
0.092%
0.092%
865
3
ELECTRICAL
3963‐KAHN‐2‐37‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 ELECTRICAL CABLE SCHEDULE
1
A
0.097%
28‐May‐17
7‐Jun‐17
12‐Jun‐17
13‐Jul‐17
3‐Aug‐17
13‐Aug‐17
31‐Oct‐18
30‐May‐17
30‐May‐17
31‐May‐17
2‐Aug‐17
3‐Aug‐17
19‐Sep‐17
22‐Jul‐19
30‐May‐17
30‐May‐17
31‐May‐17
2‐Aug‐17
3‐Aug‐17
19‐Sep‐17
95%
95%
0%
0.092%
0.092%
866
3
ELECTRICAL
3963‐KAHN‐2‐54‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 22‐DB‐7311/7312 DISTRIBUTION BOARD SINGLE LINE DIAGRAM
1
A
0.097%
18‐Jun‐17
28‐Jun‐17
3‐Jul‐17
3‐Aug‐17
24‐Aug‐17
3‐Sep‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
3‐Aug‐17
17‐Aug‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
3‐Aug‐17
17‐Aug‐17
95%
95%
0%
0.092%
0.092%
867
3
ELECTRICAL
3963‐KAHN‐2‐54‐0002
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 22UPS‐1801 UPS 10KVA SINGLE LINE DIAGRAM‐110/240V AC
1
A
0.097%
18‐Jun‐17
28‐Jun‐17
3‐Jul‐17
3‐Aug‐17
24‐Aug‐17
3‐Sep‐17
31‐Oct‐18
11‐May‐17
11‐May‐17
11‐May‐17
5‐Jun‐17
13‐Jun‐17
25‐Sep‐17
22‐Jul‐19
11‐May‐17
11‐May‐17
11‐May‐17
5‐Jun‐17
13‐Jun‐17
25‐Sep‐17
95%
95%
0%
0.092%
0.092%
Page 7 of 13
Page 78 of 170
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC NO
ITEM CODE
DOC DESC
DOC CLASS
CURRENT REVISION
DOC CLASS 1
CURRENT REVISION A
SHUTD OWN PACKA GE SHUTD OWN
Original BL WV
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100%
ACTIAFC
ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
SRN
SEQ
DISCIPLINE
DOC NO
WV
PLS
PLD
PLASBUILT
PLS
PLD
PLIFC
PLASBUILT
ACTS
ACTD
ACTIFC
868
3
ELECTRICAL
3963‐KAHN‐2‐64‐0001
ITEM DOC DESC CODE OT DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 CABLE ROUTING LAYOUT
0.153%
18‐Jun‐17
28‐Jun‐17
3‐Jul‐17
3‐Aug‐17
24‐Aug‐17
3‐Sep‐17
31‐Oct‐18
17‐Jun‐17
18‐Jun‐17
19‐Jun‐17
2‐Aug‐17
3‐Aug‐17
29‐Oct‐17
22‐Jul‐19
17‐Jun‐17
18‐Jun‐17
19‐Jun‐17
2‐Aug‐17
3‐Aug‐17
29‐Oct‐17
869
3
ELECTRICAL
3963‐KAHN‐2‐65‐0002
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 EARTHING LAYOUT
1
A
0.111%
18‐Jul‐17
28‐Jul‐17
2‐Aug‐17
20‐Aug‐17
30‐Aug‐17
9‐Sep‐17
31‐Oct‐18
2‐Jul‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
20‐Sep‐17
20‐Sep‐17
22‐Jul‐19
2‐Jul‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
20‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.106%
0.106%
870
3
ELECTRICAL
3963‐KAHN‐2‐67‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 LIGHTING LAYOUT
1
A
0.097%
18‐Jul‐17
28‐Jul‐17
2‐Aug‐17
20‐Aug‐17
30‐Aug‐17
9‐Sep‐17
31‐Oct‐18
22‐May‐17
23‐May‐17
25‐May‐17
13‐Jun‐17
21‐Jun‐17
3‐Aug‐17
22‐Jul‐19
22‐May‐17
23‐May‐17
25‐May‐17
13‐Jun‐17
21‐Jun‐17
3‐Aug‐17
95%
95%
0%
0.092%
0.092%
871
3
ELECTRICAL
3963‐KAHN‐2‐31‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING
3
A
0.097%
8‐Jul‐17
18‐Jul‐17
6‐Aug‐17
11‐Aug‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
19‐Oct‐17
22‐Jul‐19
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
19‐Oct‐17
95%
95%
0%
0.092%
0.092%
872
3
ELECTRICAL
3963‐KAHN‐2‐31‐0002
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING
3
A
0.083%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Feb‐18
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Feb‐18
95%
95%
0%
0.079%
873
3
ELECTRICAL
3963‐KAHN‐2‐17‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 POWER ADEQUACY REPORT
1
A
0.153%
30‐May‐17
9‐Jun‐17
14‐Jun‐17
15‐Jul‐17
5‐Aug‐17
15‐Aug‐17
31‐Oct‐18
1‐Jun‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
24‐Sep‐17
22‐Jul‐19
1‐Jun‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
24‐Sep‐17
95%
95%
0%
0.145%
0.145%
874
3
ELECTRICAL
3963‐KAHN‐2‐12‐0001
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 LV CABLE SIZING CALCULATION
1
A
0.111%
15‐Apr‐17
25‐Apr‐17
30‐Apr‐17
31‐May‐17
21‐Jun‐17
1‐Jul‐17
31‐Oct‐18
19‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
5‐Oct‐17
22‐Jul‐19
19‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
5‐Oct‐17
95%
95%
0%
0.106%
0.106%
875
3
ELECTRICAL
3963‐KAHN‐2‐12‐0002
OT
DUKHAN FIELD ‐ KHATIYAH NORTH UNIT 22 LIGHTING CALCULATION
1
A
0.111%
28‐May‐17
7‐Jun‐17
12‐Jun‐17
13‐Jul‐17
3‐Aug‐17
13‐Aug‐17
31‐Oct‐18
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
5‐Jun‐17
13‐Jun‐17
19‐Sep‐17
22‐Jul‐19
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
5‐Jun‐17
13‐Jun‐17
19‐Sep‐17
95%
95%
0%
0.106%
0.106%
1
A
0.097%
15‐Jun‐17
25‐Jun‐17
30‐Jun‐17
31‐Jul‐17
21‐Aug‐17
31‐Aug‐17
31‐Oct‐18
PLIFC
23‐Jul‐17
PLIFA
PLIAWH
PLIAFC
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
3963‐KAHS‐2‐34‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 ELECTRICAL LOAD SCHEDULE
20‐Sep‐17
95%
95%
0%
0.092%
0.092%
3963‐KAHS‐2‐36‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 ELECTRICAL TIE‐IN SCHEDULE
1
A
0.097%
25‐Jul‐17
4‐Aug‐17
9‐Aug‐17
27‐Aug‐17
6‐Sep‐17
16‐Sep‐17
31‐Oct‐18
16‐May‐17
17‐May‐17
17‐May‐17
2‐Aug‐17
3‐Aug‐17
25‐Sep‐17
22‐Jul‐19
16‐May‐17
17‐May‐17
17‐May‐17
2‐Aug‐17
3‐Aug‐17
25‐Sep‐17
95%
95%
0%
0.092%
0.092%
3963‐KAHS‐2‐37‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 ELECTRICAL CABLE SCHEDULE
1
A
0.097%
25‐Jul‐17
4‐Aug‐17
9‐Aug‐17
27‐Aug‐17
6‐Sep‐17
16‐Sep‐17
31‐Oct‐18
30‐May‐17
30‐May‐17
31‐May‐17
2‐Aug‐17
3‐Aug‐17
19‐Sep‐17
22‐Jul‐19
30‐May‐17
30‐May‐17
31‐May‐17
2‐Aug‐17
3‐Aug‐17
19‐Sep‐17
95%
95%
0%
0.092%
0.092%
879
3
ELECTRICAL
3963‐KAHS‐2‐54‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 23‐SB‐7220 SWITCHBOARD SINGLE LINE DIAGRAM‐415V SYSTE
1
3
0.083%
4‐Jun‐17
14‐Jun‐17
19‐Jun‐17
20‐Jul‐17
10‐Aug‐17
20‐Aug‐17
31‐Oct‐18
11‐May‐17
11‐May‐17
11‐May‐17
5‐Jun‐17
13‐Jun‐17
19‐Sep‐17
22‐Jul‐19
11‐May‐17
11‐May‐17
11‐May‐17
5‐Jun‐17
13‐Jun‐17
19‐Sep‐17
95%
95%
0%
0.079%
0.079%
880
3
ELECTRICAL
3963‐KAHS‐2‐54‐0002
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 23‐DB‐0001/0002‐ DISTRIBUTION BOARD SINGLE LINE DIAGRA
1
A
0.097%
4‐Jun‐17
14‐Jun‐17
19‐Jun‐17
20‐Jul‐17
10‐Aug‐17
20‐Aug‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
12‐Jun‐17
22‐Aug‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
12‐Jun‐17
22‐Aug‐17
95%
95%
0%
0.092%
0.092%
881
3
ELECTRICAL
3963‐KAHS‐2‐54‐0003
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 23‐UPS‐7701,15KVA SINGLE LINE DIAGRAM‐110/240V AC SYST
1
A
0.097%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
11‐May‐17
11‐May‐17
11‐May‐17
5‐Jun‐17
3‐Aug‐17
20‐Sep‐17
22‐Jul‐19
11‐May‐17
11‐May‐17
11‐May‐17
5‐Jun‐17
3‐Aug‐17
20‐Sep‐17
95%
95%
0%
0.092%
0.092%
15‐Jul‐17
20‐Jul‐17
5‐Jul‐17
20‐Aug‐17
10‐Sep‐17
2‐Aug‐17
3‐Aug‐17
8‐Nov‐17
2‐Aug‐17
3‐Aug‐17
8‐Nov‐17
3
ELECTRICAL
3963‐KAHS‐2‐65‐0002
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 EARTHING LAYOUT
1
A
0.097%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jun‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
20‐Sep‐17
20‐Sep‐17
22‐Jul‐19
28‐Jun‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
20‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.092%
0.092%
3
ELECTRICAL
3963‐KAHS‐2‐67‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 LIGHTING LAYOUT
1
A
0.097%
30‐Jun‐17
10‐Jul‐17
15‐Jul‐17
15‐Aug‐17
5‐Sep‐17
15‐Sep‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
22‐Jun‐17
2‐Aug‐17
3‐Aug‐17
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
22‐Jun‐17
2‐Aug‐17
3‐Aug‐17
95%
95%
0%
0.092%
0.092%
6‐Jul‐17
0.092%
22‐Jul‐19
17‐Jun‐17
95%
95%
0%
0.106%
0.106%
3
ELECTRICAL
3963‐KAHS‐2‐31‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING
3
A
0.097%
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
20‐Sep‐17
5‐Oct‐17
19‐Oct‐17
22‐Jul‐19
6‐Jul‐17
20‐Sep‐17
5‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.092%
ELECTRICAL
3963‐KAHS‐2‐31‐0002
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING
3
A
0.083%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
8‐Jul‐17
8‐Jul‐17
9‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Feb‐18
22‐Jul‐19
8‐Jul‐17
8‐Jul‐17
9‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Feb‐18
95%
95%
0%
0.079%
3
ELECTRICAL
3963‐KAHS‐2‐17‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 POWER ADEQUACY REPORT
1
A
0.153%
22‐Apr‐17
2‐May‐17
7‐May‐17
7‐Jun‐17
28‐Jun‐17
8‐Jul‐17
31‐Oct‐18
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
20‐Sep‐17
22‐Jul‐19
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
20‐Sep‐17
95%
95%
0%
0.145%
0.145%
888
3
ELECTRICAL
3963‐KAHS‐2‐12‐0001
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 LV CABLE SIZING CALCULATION
1
A
0.111%
7‐Jul‐17
17‐Jul‐17
22‐Jul‐17
22‐Aug‐17
9‐Sep‐17
16‐Sep‐17
31‐Oct‐18
22‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
28‐Sep‐17
22‐Jul‐19
22‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
28‐Sep‐17
95%
95%
0%
0.106%
0.106%
889
3
ELECTRICAL
3963‐KAHS‐2‐12‐0002
OT
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 LIGHTING CALCULATION
1
A
0.111%
7‐Jul‐17
17‐Jul‐17
22‐Jul‐17
22‐Aug‐17
9‐Sep‐17
16‐Sep‐17
31‐Oct‐18
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
5‐Jun‐17
13‐Jun‐17
19‐Sep‐17
22‐Jul‐19
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
5‐Jun‐17
13‐Jun‐17
19‐Sep‐17
95%
95%
0%
0.106%
0.106%
890
3
ELECTRICAL
3963‐FAHM‐2‐34‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 ELECTRICAL LOAD SCHEDULE
1
A
0.097%
17‐Apr‐17
2‐Jun‐17
23‐Jun‐17
30‐Apr‐17
3‐May‐17
5‐Jul‐17
3‐Aug‐17
20‐Sep‐17
22‐Jul‐19
30‐Apr‐17
3‐May‐17
5‐Jul‐17
3‐Aug‐17
891
3
ELECTRICAL
3963‐FAHM‐2‐36‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 ELECTRICAL TIE‐IN SCHEDULE
1
B
0.097%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
22‐Jun‐17
22‐Jun‐17
22‐Jul‐19
19‐Apr‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
22‐Jun‐17
22‐Jun‐17
95%
95%
0%
0.092%
0.092%
892
3
ELECTRICAL
3963‐FAHM‐2‐37‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 ELECTRICAL CABLE SCHEDULE
1
A
0.097%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
22‐May‐17
23‐May‐17
25‐May‐17
19‐Jun‐17
27‐Jun‐17
19‐Sep‐17
22‐Jul‐19
22‐May‐17
23‐May‐17
25‐May‐17
19‐Jun‐17
27‐Jun‐17
19‐Sep‐17
95%
95%
0%
0.092%
0.092%
893
3
ELECTRICAL
3963‐FAHM‐2‐54‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 14‐MCC‐2601 MOTOR CONTROL CENTRE SINGLE LINE DIAGRAM‐
1
3
0.083%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
19‐Sep‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
19‐Sep‐17
95%
95%
0%
0.079%
0.079%
894
3
ELECTRICAL
3963‐FAHM‐2‐54‐0002
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 14‐DB‐2603 ‐ DISTRIBUTION BOARD SINGLE LINE DIAGRAM‐415V
1
B
0.097%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
19‐Jul‐17
31‐Oct‐18
9‐May‐17
10‐May‐17
1‐Jun‐17
21‐Jun‐17
21‐Jun‐17
22‐Jul‐19
9‐May‐17
10‐May‐17
1‐Jun‐17
21‐Jun‐17
21‐Jun‐17
95%
95%
0%
0.092%
0.092%
895
3
ELECTRICAL
3963‐FAHM‐2‐54‐0003
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 14‐UPS‐2605 UPS,10KVA SINGLE LINE DIAGRAM‐240V AC SYSTEM
1
A
0.097%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
14‐Jun‐17
22‐Jun‐17
20‐Sep‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
14‐Jun‐17
22‐Jun‐17
20‐Sep‐17
95%
95%
0%
0.092%
0.092%
896
3
ELECTRICAL
3963‐FAHM‐2‐64‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 CABLE ROUTING LAYOUT
1
A
0.097%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
25‐May‐17
10‐Jun‐17
11‐Jun‐17
2‐Aug‐17
3‐Aug‐17
9‐Jan‐18
22‐Jul‐19
25‐May‐17
10‐Jun‐17
11‐Jun‐17
2‐Aug‐17
3‐Aug‐17
9‐Jan‐18
95%
95%
0%
0.092%
0.092%
897
3
ELECTRICAL
3963‐FAHM‐2‐65‐0002
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 EARTHING LAYOUT
1
A
0.097%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
25‐May‐17
2‐Jul‐17
3‐Jul‐17
20‐Jul‐17
19‐Sep‐17
20‐Sep‐17
22‐Jul‐19
25‐May‐17
2‐Jul‐17
3‐Jul‐17
20‐Jul‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.092%
0.092%
13‐Jun‐17
21‐Jun‐17
13‐Jun‐17
0.092%
9‐Jul‐17
19‐Apr‐17
7‐May‐17
7‐May‐17
20‐Sep‐17
95%
95%
0%
0.092%
0.079%
0.092%
898
3
ELECTRICAL
3963‐FAHM‐2‐67‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 LIGHTING LAYOUT
1
A
0.097%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
21‐May‐17
22‐May‐17
24‐May‐17
22‐Jul‐19
21‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
3‐Aug‐17
95%
95%
0%
0.092%
899
3
ELECTRICAL
3963‐FAHM‐2‐31‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING CA
3
A
0.097%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
6‐Jul‐17
6‐Jul‐17
28‐Sep‐17
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
6‐Jul‐17
6‐Jul‐17
28‐Sep‐17
95%
95%
0%
0.092%
900
3
ELECTRICAL
3963‐FAHM‐2‐31‐0002
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, PO
3
A
0.097%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
95%
95%
0%
0.092%
0.092%
901
3
ELECTRICAL
3963‐FAHM‐2‐17‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 POWER ADEQUACY REPORT
1
A
0.153%
1‐May‐17
11‐May‐17
16‐May‐17
16‐Jun‐17
7‐Jul‐17
17‐Jul‐17
31‐Oct‐18
25‐May‐17
12‐Jun‐17
13‐Jun‐17
12‐Sep‐17
24‐Sep‐17
24‐Sep‐17
22‐Jul‐19
25‐May‐17
12‐Jun‐17
13‐Jun‐17
12‐Sep‐17
24‐Sep‐17
24‐Sep‐17
95%
95%
0%
0.145%
0.145%
902
3
ELECTRICAL
3963‐FAHM‐2‐12‐0001
OT
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 LV CABLE SIZING CALCULATION
1
A
0.111%
17‐Apr‐17
27‐Apr‐17
2‐May‐17
2‐Jun‐17
23‐Jun‐17
3‐Jul‐17
31‐Oct‐18
19‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
22‐Jun‐17
22‐Jun‐17
22‐Jul‐19
19‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
22‐Jun‐17
22‐Jun‐17
95%
95%
0%
0.106%
0.106%
ELECTRICAL
3963‐FAHM‐2‐12‐0002
17‐Apr‐17
20‐Jul‐17
17‐Apr‐17
20‐Jul‐17
903
4‐May‐17
9‐May‐17
9‐Jun‐17
18‐Sep‐17
19‐Sep‐17
22‐Jul‐19
18‐Sep‐17
19‐Sep‐17
904
3
ELECTRICAL
3963‐FAHN‐2‐34‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 ELECTRICAL LOAD SCHEDULE
1
A
0.097%
24‐Apr‐17
4‐May‐17
9‐May‐17
9‐Jun‐17
30‐Jun‐17
10‐Jul‐17
31‐Oct‐18
25‐Apr‐17
30‐Apr‐17
3‐May‐17
5‐Jul‐17
3‐Aug‐17
28‐Sep‐17
22‐Jul‐19
25‐Apr‐17
30‐Apr‐17
3‐May‐17
5‐Jul‐17
3‐Aug‐17
28‐Sep‐17
95%
95%
0%
0.092%
0.092%
3
ELECTRICAL
3963‐FAHN‐2‐36‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 ELECTRICAL TIE‐IN SCHEDULE
1
A
0.083%
24‐Apr‐17
4‐May‐17
9‐May‐17
9‐Jun‐17
30‐Jun‐17
10‐Jul‐17
31‐Oct‐18
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
7‐Dec‐17
22‐Jul‐19
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
7‐Dec‐17
95%
95%
0%
0.079%
0.079%
906
3
ELECTRICAL
3963‐FAHN‐2‐37‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 ELECTRICAL CABLE SCHEDULE
1
A
0.097%
10‐May‐17
20‐May‐17
25‐May‐17
25‐Jun‐17
16‐Jul‐17
26‐Jul‐17
31‐Oct‐18
22‐May‐17
23‐May‐17
25‐May‐17
19‐Jun‐17
27‐Jun‐17
28‐Sep‐17
22‐Jul‐19
22‐May‐17
23‐May‐17
25‐May‐17
19‐Jun‐17
27‐Jun‐17
28‐Sep‐17
95%
95%
0%
0.092%
0.092%
907
3
ELECTRICAL
3963‐FAHN‐2‐54‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 12‐SB‐0007‐EXISTING LV SWITCHBOARD SINGLE LINE DIAGRAM‐
1
B
0.083%
10‐May‐17
20‐May‐17
25‐May‐17
25‐Jun‐17
16‐Jul‐17
26‐Jul‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
24‐Sep‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
24‐Sep‐17
95%
95%
0%
0.079%
908
3
ELECTRICAL
3963‐FAHN‐2‐54‐0002
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 12‐DB‐0001/0002 ‐ EXISTING LV DISTRIBUTION BOARD SINGLE L
1
B
0.083%
10‐May‐17
20‐May‐17
25‐May‐17
25‐Jun‐17
16‐Jul‐17
26‐Jul‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
21‐Jun‐17
21‐Jun‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
21‐Jun‐17
21‐Jun‐17
95%
95%
0%
0.079%
0.079%
909
3
ELECTRICAL
3963‐FAHN‐2‐54‐0003
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 12‐UPS‐0007 UPS,5KVA SINGLE LINE DIAGRAM‐110V AC SYSTEM
1
A
0.083%
10‐May‐17
20‐May‐17
25‐May‐17
25‐Jun‐17
16‐Jul‐17
26‐Jul‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
20‐Sep‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
20‐Sep‐17
95%
95%
0%
0.079%
0.079%
910
3
ELECTRICAL
3963‐FAHN‐2‐64‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 CABLE ROUTING LAYOUT
1
A
0.097%
3‐Jun‐17
13‐Jun‐17
18‐Jun‐17
19‐Jul‐17
9‐Aug‐17
19‐Aug‐17
31‐Oct‐18
7‐Jun‐17
14‐Jun‐17
15‐Jun‐17
2‐Aug‐17
3‐Aug‐17
4‐Dec‐17
22‐Jul‐19
7‐Jun‐17
14‐Jun‐17
15‐Jun‐17
2‐Aug‐17
3‐Aug‐17
4‐Dec‐17
95%
95%
0%
0.092%
0.092%
9‐Aug‐17
0.111%
24‐Apr‐17
30‐Jun‐17
10‐Jul‐17
31‐Oct‐18
14‐Apr‐17
14‐Apr‐17
14‐Apr‐17
95%
95%
0%
0.106%
0.106%
0.079%
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 EARTHING LAYOUT
1
A
0.083%
3‐Jun‐17
13‐Jun‐17
18‐Jun‐17
19‐Jul‐17
19‐Aug‐17
31‐Oct‐18
7‐Jun‐17
3‐Jul‐17
4‐Jul‐17
20‐Jul‐17
19‐Sep‐17
22‐Jul‐19
7‐Jun‐17
3‐Jul‐17
4‐Jul‐17
20‐Jul‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.079%
0.079%
ELECTRICAL
3963‐FAHN‐2‐67‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 LIGHTING LAYOUT
1
A
0.083%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
22‐May‐17
23‐May‐17
25‐May‐17
21‐Jun‐17
29‐Jun‐17
3‐Aug‐17
22‐Jul‐19
22‐May‐17
23‐May‐17
25‐May‐17
21‐Jun‐17
29‐Jun‐17
3‐Aug‐17
95%
95%
0%
0.079%
0.079%
ELECTRICAL
3963‐FAHN‐2‐31‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C
3
A
0.083%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
95%
95%
0%
0.079%
0.079%
914
3
ELECTRICAL
3963‐FAHN‐2‐31‐0002
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING,
3
A
0.083%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
1‐Oct‐17
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
1‐Oct‐17
95%
95%
0%
0.079%
915
3
ELECTRICAL
3963‐FAHN‐2‐17‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 POWER ADEQUACY REPORT
1
A
0.153%
8‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
19‐Oct‐17
22‐Jul‐19
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
19‐Oct‐17
95%
95%
0%
0.145%
0.145%
916
3
ELECTRICAL
3963‐FAHN‐2‐12‐0001
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 LV CABLE SIZING CALCULATION
1
A
0.111%
24‐Apr‐17
4‐May‐17
9‐May‐17
9‐Jun‐17
30‐Jun‐17
10‐Jul‐17
31‐Oct‐18
22‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
28‐Sep‐17
22‐Jul‐19
22‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
28‐Sep‐17
95%
95%
0%
0.106%
0.106%
917
3
ELECTRICAL
3963‐FAHN‐2‐12‐0002
OT
DUKHAN FIELD ‐ FAHAHIL NORTH UNIT 12 LIGHTING CALCULATION
1
B
0.111%
1‐May‐17
11‐May‐17
16‐May‐17
16‐Jun‐17
7‐Jul‐17
17‐Jul‐17
31‐Oct‐18
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
19‐Jun‐17
19‐Jun‐17
19‐Jun‐17
22‐Jul‐19
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
19‐Jun‐17
19‐Jun‐17
19‐Jun‐17
95%
95%
0%
0.106%
0.106%
5‐Oct‐17
22‐Jul‐19
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 ELECTRICAL LOAD SCHEDULE
1
B
11‐May‐17
16‐May‐17
16‐Jun‐17
7‐Jul‐17
17‐Jul‐17
31‐Oct‐18
5‐Jul‐17
3‐Aug‐17
5‐Jul‐17
3‐Aug‐17
919
3
ELECTRICAL
3963‐FAHS‐2‐36‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 ELECTRICAL TIE‐IN SCHEDULE
1
A
0.083%
1‐May‐17
11‐May‐17
16‐May‐17
16‐Jun‐17
7‐Jul‐17
17‐Jul‐17
31‐Oct‐18
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
7‐Dec‐17
22‐Jul‐19
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
7‐Dec‐17
95%
95%
0%
0.079%
0.079%
3
ELECTRICAL
3963‐FAHS‐2‐37‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 ELECTRICAL CABLE SCHEDULE
1
A
0.083%
18‐May‐17
28‐May‐17
2‐Jun‐17
3‐Jul‐17
24‐Jul‐17
3‐Aug‐17
31‐Oct‐18
25‐May‐17
29‐May‐17
30‐May‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
22‐Jul‐19
25‐May‐17
29‐May‐17
30‐May‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
95%
95%
0%
0.079%
0.079%
921
3
ELECTRICAL
3963‐FAHS‐2‐54‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 12‐SB‐0007‐EXISTING LV SWITCHBOARD SINGLE LINE DIAGRAM‐
1
1‐Jun‐17
9‐Jun‐17
24‐Sep‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
922
3
ELECTRICAL
3963‐FAHS‐2‐54‐0002
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 12‐DB‐0001/0002 ‐ EXISTING LV DISTRIBUTION BOARD SINGLE L
1
B
0.083%
18‐May‐17
28‐May‐17
2‐Jun‐17
3‐Jul‐17
24‐Jul‐17
3‐Aug‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
21‐Jun‐17
21‐Jun‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
21‐Jun‐17
21‐Jun‐17
95%
95%
0%
0.079%
0.079%
923
3
ELECTRICAL
3963‐FAHS‐2‐54‐0003
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 12‐UPS‐0007 UPS,5KVA SINGLE LINE DIAGRAM‐110V AC SYSTEM
1
A
0.083%
18‐May‐17
28‐May‐17
2‐Jun‐17
3‐Jul‐17
24‐Jul‐17
3‐Aug‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
20‐Sep‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
9‐Jun‐17
20‐Sep‐17
95%
95%
0%
0.079%
0.079%
924
3
ELECTRICAL
3963‐FAHS‐2‐64‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 CABLE ROUTING LAYOUT
1
A
0.111%
10‐Jun‐17
20‐Jun‐17
25‐Jun‐17
26‐Jul‐17
16‐Aug‐17
26‐Aug‐17
31‐Oct‐18
17‐Jun‐17
18‐Jun‐17
19‐Jun‐17
2‐Aug‐17
3‐Aug‐17
8‐Nov‐17
22‐Jul‐19
17‐Jun‐17
18‐Jun‐17
19‐Jun‐17
2‐Aug‐17
3‐Aug‐17
8‐Nov‐17
95%
95%
0%
0.106%
0.106%
0.083%
1‐May‐17
18‐May‐17
28‐May‐17
2‐Jun‐17
3‐Jul‐17
24‐Jul‐17
3‐Aug‐17
31‐Oct‐18
25‐Apr‐17
7‐May‐17
30‐Apr‐17
9‐May‐17
3‐May‐17
10‐May‐17
30‐Apr‐17
3‐May‐17
5‐Oct‐17
24‐Sep‐17
95%
95%
95%
95%
0%
0%
0.079%
0.079%
0.079%
0.079%
925
3
ELECTRICAL
3963‐FAHS‐2‐65‐0002
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 EARTHING LAYOUT
1
A
0.083%
10‐Jun‐17
20‐Jun‐17
25‐Jun‐17
26‐Jul‐17
16‐Aug‐17
26‐Aug‐17
31‐Oct‐18
2‐Jul‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
19‐Sep‐17
22‐Jul‐19
2‐Jul‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.079%
0.079%
926
3
ELECTRICAL
3963‐FAHS‐2‐67‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 LIGHTING LAYOUT
1
A
0.083%
10‐Jun‐17
20‐Jun‐17
25‐Jun‐17
26‐Jul‐17
16‐Aug‐17
26‐Aug‐17
31‐Oct‐18
27‐May‐17
27‐May‐17
28‐May‐17
21‐Jun‐17
29‐Jun‐17
3‐Aug‐17
22‐Jul‐19
27‐May‐17
27‐May‐17
28‐May‐17
21‐Jun‐17
29‐Jun‐17
3‐Aug‐17
95%
95%
0%
0.079%
0.079%
927
3
ELECTRICAL
3963‐FAHS‐2‐31‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING C
3
A
0.083%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
95%
95%
0%
0.079%
0.079%
928
3
ELECTRICAL
3963‐FAHS‐2‐31‐0002
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, P
3
A
0.083%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
2‐Oct‐17
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
2‐Aug‐17
3‐Aug‐17
2‐Oct‐17
95%
95%
0%
0.079%
0.079%
929
3
ELECTRICAL
3963‐FAHS‐2‐17‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 POWER ADEQUACY REPORT
1
A
0.153%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
7‐Dec‐17
22‐Jul‐19
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
7‐Dec‐17
95%
95%
0%
0.145%
930
3
ELECTRICAL
3963‐FAHS‐2‐12‐0001
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 LV CABLE SIZING CALCULATION
1
A
0.111%
1‐May‐17
11‐May‐17
16‐May‐17
16‐Jun‐17
7‐Jul‐17
17‐Jul‐17
31‐Oct‐18
22‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
28‐Sep‐17
22‐Jul‐19
22‐Apr‐17
22‐Apr‐17
24‐Apr‐17
17‐May‐17
25‐May‐17
28‐Sep‐17
95%
95%
0%
0.106%
0.106%
931
3
ELECTRICAL
3963‐FAHS‐2‐12‐0002
OT
DUKHAN FIELD ‐ FAHAHIL SOUTH UNIT 13 LIGHTING CALCULATION
1
A
0.111%
8‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
20‐Jul‐17
18‐Sep‐17
19‐Sep‐17
22‐Jul‐19
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
20‐Jul‐17
18‐Sep‐17
19‐Sep‐17
95%
95%
0%
0.106%
0.106%
932
3
ELECTRICAL
3963‐JALM‐2‐34‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 ELECTRICAL LOAD SCHEDULE
1
A
0.083%
30‐Jun‐17
10‐Jul‐17
15‐Jul‐17
15‐Aug‐17
5‐Sep‐17
15‐Sep‐17
31‐Oct‐18
4‐May‐17
4‐May‐17
4‐May‐17
2‐Jul‐17
10‐Jul‐17
20‐Sep‐17
22‐Jul‐19
4‐May‐17
4‐May‐17
4‐May‐17
2‐Jul‐17
10‐Jul‐17
20‐Sep‐17
95%
95%
0%
0.079%
0.079%
933
3
ELECTRICAL
3963‐JALM‐2‐36‐0001
OT
20‐Sep‐17
25‐Apr‐17
0.079%
920
B
0.083%
20‐Sep‐17
14‐Apr‐17
3
3963‐FAHS‐2‐34‐0001
OT
A
3
ELECTRICAL
3963‐FAHN‐2‐65‐0002
1
912
3
ELECTRICAL
DUKHAN FIELD ‐ FAHAHIL MAIN UNIT 14 LIGHTING CALCULATION
913
918
3
OT
0.092%
905
911
3
3‐Aug‐17
19‐Apr‐17
5‐Jul‐17
19‐Jun‐17
3
31‐Oct‐18
4‐Jul‐17
18‐Jun‐17
885
3‐Jul‐17
5‐Jul‐17
19‐Jun‐17
887
2‐May‐17
4‐Jul‐17
18‐Jun‐17
886
27‐Apr‐17
31‐Oct‐18
17‐Jun‐17
13‐Jul‐17
883
18‐Jul‐17
31‐Oct‐18
5‐Jul‐17
884
8‐Jul‐17
20‐Sep‐17
4‐May‐17
0.079%
ELECTRICAL
0.111%
3‐May‐17
0.145%
ELECTRICAL
A
4‐May‐17
Actual WF
ELECTRICAL
1
22‐Jul‐19
0.145%
3
DUKHAN FIELD ‐ KHATIYAH SOUTH UNIT 23 CABLE ROUTING LAYOUT
20‐Sep‐17
Plan WF
3
OT
13‐Jul‐17
5‐Jul‐17
ACTIAWH
3
3963‐KAHS‐2‐64‐0001
5‐Jul‐17
4‐Jul‐17
ACTIFA
876
ELECTRICAL
4‐May‐17
PLIAFC
878
3
3‐May‐17
PLIAWH
877
882
4‐May‐17
5‐Jul‐17
PLIFA
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
0.145%
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 ELECTRICAL TIE‐IN SCHEDULE
1
A
0.083%
8‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
25‐Sep‐17
22‐Jul‐19
16‐May‐17
17‐May‐17
17‐May‐17
8‐Jun‐17
16‐Jun‐17
25‐Sep‐17
95%
95%
0%
0.079%
0.079%
934
3
ELECTRICAL
3963‐JALM‐2‐37‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 ELECTRICAL CABLE SCHEDULE
1
A
0.083%
8‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
22‐May‐17
23‐May‐17
25‐May‐17
19‐Jun‐17
27‐Jun‐17
19‐Sep‐17
22‐Jul‐19
22‐May‐17
23‐May‐17
25‐May‐17
19‐Jun‐17
27‐Jun‐17
19‐Sep‐17
95%
95%
0%
0.079%
0.079%
935
3
ELECTRICAL
3963‐JALM‐2‐54‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 31‐MCC‐0001‐415V MOTOR CONTROL CENTER‐SINGLE LINE DIAGR
1
3
0.083%
25‐May‐17
4‐Jun‐17
9‐Jun‐17
10‐Jul‐17
31‐Jul‐17
10‐Aug‐17
31‐Oct‐18
8‐May‐17
10‐May‐17
11‐May‐17
5‐Jun‐17
13‐Jun‐17
19‐Sep‐17
22‐Jul‐19
8‐May‐17
10‐May‐17
11‐May‐17
5‐Jun‐17
13‐Jun‐17
19‐Sep‐17
95%
95%
0%
0.079%
0.079%
936
3
ELECTRICAL
3963‐JALM‐2‐54‐0002
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 31‐DB‐5206B ‐ LIGHTING DISTRIBUTION BOARD SINGLE LINE DIAGR
1
A
0.083%
25‐May‐17
4‐Jun‐17
9‐Jun‐17
10‐Jul‐17
31‐Jul‐17
10‐Aug‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.079%
0.079%
937
3
ELECTRICAL
3963‐JALM‐2‐54‐0003
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 31‐UPS‐0001 UPS,5KVA SINGLE LINE DIAGRAM‐110V AC INSTRUME
1
A
0.083%
25‐May‐17
4‐Jun‐17
9‐Jun‐17
10‐Jul‐17
31‐Jul‐17
10‐Aug‐17
31‐Oct‐18
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
3‐Aug‐17
23‐Aug‐17
22‐Jul‐19
7‐May‐17
9‐May‐17
10‐May‐17
4‐Jun‐17
3‐Aug‐17
23‐Aug‐17
95%
95%
0%
0.079%
0.079%
2‐Jul‐17
2‐Aug‐17
22‐Jul‐19
23‐Aug‐17
2‐Sep‐17
31‐Oct‐18
2‐Aug‐17
3‐Aug‐17
8‐Nov‐17
2‐Aug‐17
3‐Aug‐17
8‐Nov‐17
95%
95%
0%
0.106%
0.106%
939
3
ELECTRICAL
3963‐JALM‐2‐65‐0002
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 EARTHING LAYOUT
1
A
0.083%
17‐Jun‐17
27‐Jun‐17
2‐Jul‐17
2‐Aug‐17
23‐Aug‐17
2‐Sep‐17
31‐Oct‐18
22‐Jun‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
20‐Sep‐17
20‐Sep‐17
22‐Jul‐19
22‐Jun‐17
3‐Jul‐17
4‐Jul‐17
23‐Jul‐17
20‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.079%
0.079%
940
938
3
3
ELECTRICAL
ELECTRICAL
3963‐JALM‐2‐67‐0001
3963‐JALM‐2‐64‐0001
OT
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 LIGHTING LAYOUT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 CABLE ROUTING LAYOUT
1
1
A
A
0.083%
0.111%
17‐Jun‐17
17‐Jun‐17
27‐Jun‐17
2‐Jul‐17
2‐Aug‐17
23‐Aug‐17
2‐Sep‐17
31‐Oct‐18
21‐May‐17
22‐May‐17
24‐May‐17
13‐Jun‐17
21‐Jun‐17
3‐Aug‐17
22‐Jul‐19
21‐May‐17
22‐May‐17
24‐May‐17
13‐Jun‐17
21‐Jun‐17
3‐Aug‐17
95%
95%
0%
0.079%
0.079%
941
3
ELECTRICAL
3963‐JALM‐2‐31‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 MTO FOR ELECTRICAL POWER, CONTROL CABLES & EARTHING CAB
3
A
0.083%
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
6‐Jul‐17
2‐Aug‐17
3963‐JALM‐2‐31‐0002
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 MTO FOR ELECTRICAL BULK MATERIALS (LIGHTING, EARTHING, PO
3
A
0.083%
8‐Jul‐17
18‐Jul‐17
23‐Jul‐17
6‐Aug‐17
11‐Aug‐17
11‐Aug‐17
31‐Oct‐18
8‐Jul‐17
8‐Jul‐17
9‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Feb‐18
22‐Jul‐19
8‐Jul‐17
8‐Jul‐17
9‐Jul‐17
2‐Aug‐17
3‐Aug‐17
26‐Feb‐18
95%
95%
0%
0.079%
0.079%
3963‐JALM‐2‐17‐0001
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 POWER ADEQUACY REPORT
1
A
0.153%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
24‐Sep‐17
22‐Jul‐19
25‐May‐17
12‐Jun‐17
13‐Jun‐17
2‐Aug‐17
3‐Aug‐17
24‐Sep‐17
95%
95%
0%
0.145%
0.145%
17‐May‐17
25‐May‐17
25‐May‐17
5‐Oct‐17
22‐Jul‐19
4‐Jul‐17
5‐Jul‐17
3‐Aug‐17
5‐Oct‐17
0.111%
1‐Apr‐17
11‐Apr‐17
16‐Apr‐17
17‐Jun‐17
31‐Oct‐18
19‐Apr‐17
16‐Apr‐17
19‐Apr‐17
17‐May‐17
1‐Oct‐17
22‐Jul‐19
19‐Apr‐17
16‐Apr‐17
19‐Apr‐17
17‐May‐17
3963‐JALM‐2‐12‐0002
OT
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 LIGHTING CALCULATION
1
A
0.111%
10‐May‐17
20‐May‐17
25‐May‐17
25‐Jun‐17
16‐Jul‐17
26‐Jul‐17
31‐Oct‐18
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
20‐Jul‐17
18‐Sep‐17
19‐Sep‐17
22‐Jul‐19
14‐Apr‐17
14‐Apr‐17
17‐Apr‐17
20‐Jul‐17
18‐Sep‐17
19‐Sep‐17
95%
95%
0%
0.106%
0.106%
OT
DRAWING INDEX – ELECTRICAL
1
A
0.139%
18‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
15‐Sep‐17
25‐Sep‐17
31‐Oct‐18
17‐Jul‐17
18‐Jul‐17
19‐Jul‐17
3‐Aug‐17
15‐Aug‐17
15‐Aug‐17
22‐Jul‐19
17‐Jul‐17
18‐Jul‐17
19‐Jul‐17
3‐Aug‐17
15‐Aug‐17
15‐Aug‐17
95%
95%
0%
0.132%
0.132%
8‐Mar‐18
22‐Jul‐19
OT
MISCELLANEOUS ‐ ELECTRICAL
0
0.069%
31‐Aug‐17
6‐Sep‐17
7‐Sep‐17
14‐Sep‐17
14‐Sep‐17
21‐Sep‐17
31‐Oct‐18
1‐Feb‐18
6‐Feb‐18
1‐Mar‐18
8‐Mar‐18
1‐Feb‐18
6‐Feb‐18
1‐Mar‐18
8‐Mar‐18
948
2
CIVIL
3963‐DGEN‐1‐14‐0001
OT
SPECIFICATION FOR TOPOGRAPHICAL & UG SURVEY WORKS
3
A
0.097%
15‐Mar‐17
25‐Mar‐17
30‐Mar‐17
30‐Apr‐17
21‐May‐17
31‐May‐17
31‐Oct‐18
16‐Mar‐17
21‐Mar‐17
29‐Mar‐17
24‐Apr‐17
4‐May‐17
4‐May‐17
22‐Jul‐19
16‐Mar‐17
21‐Mar‐17
29‐Mar‐17
24‐Apr‐17
4‐May‐17
4‐May‐17
95%
95%
0%
0.092%
0.092%
2
CIVIL
3963‐DGEN‐1‐14‐0002
OT
SPECIFICATIONS FOR STRUCTURAL STEEL WORKS
1
A
0.069%
15‐Mar‐17
25‐Mar‐17
30‐Mar‐17
30‐Apr‐17
21‐May‐17
31‐May‐17
31‐Oct‐18
16‐Mar‐17
27‐Mar‐17
5‐Apr‐17
27‐Apr‐17
27‐Apr‐17
27‐Apr‐17
22‐Jul‐19
16‐Mar‐17
27‐Mar‐17
5‐Apr‐17
27‐Apr‐17
27‐Apr‐17
27‐Apr‐17
95%
95%
0%
0.066%
0.066%
30‐Mar‐17
30‐Apr‐17
21‐May‐17
29‐Mar‐17
0.066%
CIVIL
3963‐DGEN‐1‐14‐0003
OT
SPECIFICATIONS FOR CONCRETE WORKS
1
A
0.069%
15‐Mar‐17
25‐Mar‐17
31‐May‐17
31‐Oct‐18
21‐Mar‐17
29‐Mar‐17
12‐Apr‐17
4‐May‐17
4‐May‐17
4‐May‐17
12‐Apr‐17
4‐May‐17
4‐May‐17
4‐May‐17
95%
95%
0%
0.066%
0.066%
2
CIVIL
3963‐DGEN‐1‐14‐0004
OT
SPECIFICATIONS FOR SITE PREPARATION & EARTHWORKS
1
A
0.069%
22‐Mar‐17
1‐Apr‐17
6‐Apr‐17
7‐May‐17
28‐May‐17
7‐Jun‐17
31‐Oct‐18
14‐Mar‐17
29‐Mar‐17
5‐Apr‐17
13‐May‐17
15‐May‐17
18‐May‐17
22‐Jul‐19
14‐Mar‐17
29‐Mar‐17
5‐Apr‐17
13‐May‐17
15‐May‐17
18‐May‐17
95%
95%
0%
0.066%
0.066%
2
CIVIL
3963‐DGEN‐1‐14‐0005
OT
SPECIFICATIONS FOR ROAD & PAVING WORKS
1
A
0.069%
22‐Mar‐17
1‐Apr‐17
6‐Apr‐17
7‐May‐17
28‐May‐17
7‐Jun‐17
31‐Oct‐18
16‐Mar‐17
29‐Mar‐17
5‐Apr‐17
8‐May‐17
8‐May‐17
8‐May‐17
22‐Jul‐19
16‐Mar‐17
29‐Mar‐17
5‐Apr‐17
8‐May‐17
8‐May‐17
8‐May‐17
95%
95%
0%
0.066%
0.066%
3963‐DGEN‐1‐29‐0001
OT
30‐Apr‐17
31‐May‐17
5‐Apr‐17
CIVIL
15‐Apr‐17
25‐Apr‐17
21‐Jun‐17
21‐Mar‐17
21‐Mar‐17
0.066%
951
2
22‐Jul‐19
0%
952 953
2
95%
0.106%
949 950
95%
0.106%
0.079%
3963‐DGEN‐2‐00‐0001
8‐Mar‐18
0%
0.079%
ELECTRICAL
8‐Mar‐18
95%
0%
ELECTRICAL
8‐Mar‐18
95%
95%
3
3963‐DGEN‐2‐00‐0010
1‐Oct‐17
95%
3
ELECTRICAL
7‐Jun‐17
3‐Aug‐17
945
2
A
2‐Aug‐17
946 947
1
6‐Jul‐17
20‐Jun‐17
ELECTRICAL
DUKHAN FIELD ‐ JALEHA MAIN UNIT 31 LV CABLE SIZING CALCULATION
5‐Jul‐17
19‐Jun‐17
ELECTRICAL
OT
4‐Jul‐17
18‐Jun‐17
3
3963‐JALM‐2‐12‐0001
31‐Oct‐18
20‐Jun‐17
3
ELECTRICAL
23‐Jul‐17
19‐Jun‐17
942
3
18‐Jul‐17
18‐Jun‐17
943 944
8‐Jul‐17
27‐Jun‐17
CIVIL & STRUCTURAL DESIGN CRITERIA
1
A
0.139%
1‐Jul‐17
31‐Oct‐18
4‐May‐17
1‐Jun‐17
1‐Jun‐17
1‐Jun‐17
22‐Jul‐19
21‐Mar‐17
5‐Apr‐17
4‐May‐17
1‐Jun‐17
1‐Jun‐17
1‐Jun‐17
954
2
CIVIL
3963‐DGEN‐1‐87‐0001
OT
GENERAL NOTES ‐ CONCRETE WORKS
1
A
0.083%
15‐Mar‐17
25‐Mar‐17
30‐Mar‐17
30‐Apr‐17
21‐May‐17
31‐May‐17
31‐Oct‐18
21‐Mar‐17
21‐Mar‐17
5‐Apr‐17
3‐May‐17
24‐May‐17
24‐May‐17
22‐Jul‐19
21‐Mar‐17
21‐Mar‐17
5‐Apr‐17
3‐May‐17
24‐May‐17
24‐May‐17
95%
95%
0%
0.079%
0.079%
955
2
CIVIL
3963‐DGEN‐1‐87‐0002
OT
GENERAL NOTES ‐ STRUCTURAL STEEL WORKS
1
A
0.083%
15‐Mar‐17
25‐Mar‐17
30‐Mar‐17
30‐Apr‐17
21‐May‐17
31‐May‐17
31‐Oct‐18
16‐Mar‐17
20‐Mar‐17
5‐Apr‐17
2‐May‐17
2‐May‐17
2‐May‐17
22‐Jul‐19
16‐Mar‐17
20‐Mar‐17
5‐Apr‐17
2‐May‐17
2‐May‐17
2‐May‐17
95%
95%
95%
95%
0%
0%
0.079%
0.132%
0.079%
0.132%
27‐Apr‐17
28‐May‐17
18‐Jun‐17
956
2
CIVIL
3963‐DGEN‐1‐57‐0001
OT
TYPICAL DETAILS OF HANDRAIL
1
A
0.083%
12‐Apr‐17
22‐Apr‐17
28‐Jun‐17
31‐Oct‐18
16‐Mar‐17
29‐Mar‐17
20‐Apr‐17
8‐May‐17
24‐May‐17
24‐May‐17
22‐Jul‐19
16‐Mar‐17
29‐Mar‐17
20‐Apr‐17
8‐May‐17
24‐May‐17
24‐May‐17
95%
95%
0%
0.079%
0.079%
957
2
CIVIL
3963‐DGEN‐1‐57‐0002
OT
TYPICAL DETAILS OF STAIRS
1
A
0.083%
5‐Apr‐17
15‐Apr‐17
20‐Apr‐17
21‐May‐17
11‐Jun‐17
21‐Jun‐17
31‐Oct‐18
21‐Mar‐17
23‐Apr‐17
25‐Apr‐17
10‐May‐17
10‐May‐17
10‐May‐17
22‐Jul‐19
21‐Mar‐17
23‐Apr‐17
25‐Apr‐17
10‐May‐17
10‐May‐17
10‐May‐17
95%
95%
0%
0.079%
0.079%
958
2
CIVIL
3963‐DGEN‐1‐57‐0004
OT
TYPICAL DETAILS OF FRONT ACCESS LADDER
1
A
0.083%
3‐Apr‐17
15‐Apr‐17
20‐Apr‐17
21‐May‐17
11‐Jun‐17
21‐Jun‐17
31‐Oct‐18
2‐May‐17
4‐May‐17
4‐May‐17
22‐May‐17
24‐May‐17
24‐May‐17
22‐Jul‐19
2‐May‐17
4‐May‐17
4‐May‐17
22‐May‐17
24‐May‐17
24‐May‐17
95%
95%
0%
0.079%
959
2
CIVIL
3963‐DGEN‐1‐57‐0006
OT
TYPICAL DETAILS OF SIDE ACCESS LADDER
1
A
0.083%
12‐Apr‐17
24‐Apr‐17
29‐Apr‐17
30‐May‐17
20‐Jun‐17
30‐Jun‐17
31‐Oct‐18
4‐May‐17
6‐Jun‐17
6‐Jun‐17
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
22‐Jul‐19
4‐May‐17
6‐Jun‐17
6‐Jun‐17
4‐Jul‐17
5‐Jul‐17
6‐Jul‐17
95%
95%
0%
0.079%
0.079%
960
2
CIVIL
3963‐DGEN‐1‐64‐0001
OT
TYPICAL REINFORCED CONCRETE PAVING DETAILS
1
A
0.083%
22‐Mar‐17
1‐Apr‐17
6‐Apr‐17
7‐May‐17
28‐May‐17
7‐Jun‐17
31‐Oct‐18
14‐Mar‐17
2‐Apr‐17
5‐Apr‐17
3‐May‐17
24‐May‐17
24‐May‐17
22‐Jul‐19
14‐Mar‐17
2‐Apr‐17
5‐Apr‐17
3‐May‐17
24‐May‐17
24‐May‐17
95%
95%
0%
0.079%
0.079%
961
2
CIVIL
3963‐DGEN‐1‐57‐0003
OT
TYPICAL DETAILS OF GRATING
1
A
0.083%
5‐Apr‐17
15‐Apr‐17
20‐Apr‐17
21‐May‐17
11‐Jun‐17
21‐Jun‐17
31‐Oct‐18
15‐Mar‐17
23‐Apr‐17
25‐Apr‐17
10‐May‐17
10‐May‐17
10‐May‐17
22‐Jul‐19
15‐Mar‐17
23‐Apr‐17
25‐Apr‐17
10‐May‐17
10‐May‐17
10‐May‐17
95%
95%
0%
0.079%
0.079%
962
TYPICAL DETAILS FOR ROAD SIGNS & BARRIER
1
A
0.083%
7‐May‐17
28‐May‐17
7‐Jun‐17
31‐Oct‐18
2‐Apr‐17
5‐Apr‐17
2‐Apr‐17
5‐Apr‐17
2‐May‐17
95%
95%
0%
0.079%
963
2
CIVIL
3963‐DGEN‐1‐87‐0003
OT
TYPICAL MISC. FOUNDATIONS DETAILS
1
A
0.222%
20‐Jun‐17
30‐Jun‐17
5‐Jul‐17
5‐Aug‐17
26‐Aug‐17
5‐Sep‐17
31‐Oct‐18
22‐Jun‐17
8‐Nov‐17
15‐Nov‐17
4‐Jan‐18
4‐Jan‐18
4‐Jan‐18
22‐Jul‐19
22‐Jun‐17
8‐Nov‐17
15‐Nov‐17
4‐Jan‐18
4‐Jan‐18
4‐Jan‐18
95%
95%
0%
0.211%
0.211%
964
2
CIVIL
3963‐DGEN‐1‐87‐0004
OT
TYPICAL STRUCTURAL CONNECTION DETAILS
1
2
0.111%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
18‐May‐17
30‐Sep‐17
2‐Oct‐17
13‐Oct‐17
13‐Oct‐17
13‐Oct‐17
22‐Jul‐19
18‐May‐17
30‐Sep‐17
2‐Oct‐17
13‐Oct‐17
13‐Oct‐17
13‐Oct‐17
95%
95%
0%
0.106%
0.106%
965
2
2
CIVIL
CIVIL
3963‐DGEN‐1‐64‐0002
3963‐DGEN‐1‐87‐0005
OT
OT
TYPICAL PIPE SLEEPER FOUNDATION DETAILS
0.111%
22‐Mar‐17
15‐May‐17
1‐Apr‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
15‐Mar‐17
2‐May‐17
2‐May‐17
22‐Jul‐19
15‐Mar‐17
2‐May‐17
0.079%
1
A
18‐May‐17
7‐Aug‐17
9‐Aug‐17
20‐Dec‐17
20‐Dec‐17
22‐Jul‐19
18‐May‐17
7‐Aug‐17
9‐Aug‐17
20‐Dec‐17
20‐Dec‐17
95%
95%
0%
0.106%
0.106%
2
CIVIL
3963‐DGEN‐1‐87‐0006
OT
TYPICAL PIPE SUPPORT FOUNDATION DETAILS
1
A
0.111%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
18‐May‐17
12‐Aug‐17
14‐Aug‐17
3‐Sep‐17
20‐Sep‐17
16‐Nov‐17
22‐Jul‐19
18‐May‐17
12‐Aug‐17
14‐Aug‐17
3‐Sep‐17
20‐Sep‐17
16‐Nov‐17
95%
95%
0%
0.106%
0.106%
2
CIVIL
3963‐DGEN‐1‐58‐0001
OT
TYPICAL PIPE SUPPORT STRUCTURAL DETAILS
1
B
0.111%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
18‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Dec‐17
20‐Dec‐17
20‐Dec‐17
22‐Jul‐19
18‐May‐17
7‐Aug‐17
9‐Aug‐17
10‐Dec‐17
20‐Dec‐17
20‐Dec‐17
95%
95%
0%
0.106%
0.106%
968
2
CIVIL
3963‐DGEN‐1‐87‐0008
OT
31‐Oct‐18
22‐Mar‐17
4‐May‐17
4‐May‐17
20‐Dec‐17
2‐May‐17
966
22‐Mar‐17
20‐Dec‐17
2‐May‐17
967
12‐Apr‐17
25‐May‐17
6‐Apr‐17
0.079%
TYPICAL ROAD CROSS SECTION DETAILS
1
1
0.083%
22‐Apr‐17
27‐Apr‐17
28‐May‐17
18‐Jun‐17
28‐Jun‐17
4‐May‐17
15‐Oct‐17
15‐Oct‐17
15‐Oct‐17
22‐Jul‐19
4‐May‐17
15‐Oct‐17
15‐Oct‐17
15‐Oct‐17
969
2
CIVIL
3963‐DGEN‐1‐87‐0009
OT
TYPICAL SOAKAWAY PIT DETAILS
1
0
0.000%
12‐Apr‐17
22‐Apr‐17
27‐Apr‐17
28‐May‐17
18‐Jun‐17
28‐Jun‐17
31‐Oct‐18
28‐Jan‐18
30‐Jan‐18
31‐Jan‐18
22‐Mar‐18
28‐Mar‐18
28‐Mar‐18
22‐Jul‐19
28‐Jan‐18
30‐Jan‐18
31‐Jan‐18
22‐Mar‐18
28‐Mar‐18
28‐Mar‐18
95%
95%
0%
0.000%
0.000%
970
2
CIVIL
3963‐KAHN‐1‐64‐0001
OT
KHATIYAH NORTH DEGASSING STATION SITE GRADING LAYOUT & DETAILS
1
A
0.097%
19‐Apr‐17
29‐Apr‐17
4‐May‐17
4‐Jun‐17
25‐Jun‐17
5‐Jul‐17
31‐Oct‐18
21‐Mar‐17
13‐Jun‐17
14‐Jun‐17
8‐Nov‐17
8‐Nov‐17
7‐Feb‐18
22‐Jul‐19
21‐Mar‐17
13‐Jun‐17
14‐Jun‐17
8‐Nov‐17
8‐Nov‐17
7‐Feb‐18
95%
95%
95%
95%
0%
0%
0.092%
0.079%
0.092%
0.079%
31‐May‐17
1‐Jun‐17
16‐Sep‐17
1‐Jun‐17
16‐Sep‐17
971
2
CIVIL
3963‐KAHN‐1‐50‐0001
OT
KHATIYAH NORTH DEGASSING STATION GENERAL ARRANGEMENT CIVIL
1
A
0.097%
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
17‐Sep‐17
31‐Oct‐17
31‐Oct‐17
21‐Feb‐18
22‐Jul‐19
17‐Sep‐17
31‐Oct‐17
31‐Oct‐17
21‐Feb‐18
95%
95%
0%
0.092%
0.092%
972
2
CIVIL
3963‐KAHN‐1‐50‐0002
OT
KHATIYAH NORTH DEGASSING STATION DRAINAGE LAYOUT & DETAILS
1
B
0.097%
19‐Apr‐17
29‐Apr‐17
4‐May‐17
4‐Jun‐17
25‐Jun‐17
5‐Jul‐17
31‐Oct‐18
22‐Mar‐17
13‐Jun‐17
14‐Jun‐17
5‐Nov‐17
5‐Nov‐17
4‐Feb‐18
22‐Jul‐19
22‐Mar‐17
13‐Jun‐17
14‐Jun‐17
5‐Nov‐17
5‐Nov‐17
4‐Feb‐18
95%
95%
0%
0.092%
0.092%
973
2
CIVIL
3963‐KAHN‐1‐66‐0002
OT
KHATIYAH NORTH DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS
1
A
0.139%
17‐May‐17
27‐May‐17
1‐Jun‐17
2‐Jul‐17
23‐Jul‐17
2‐Aug‐17
31‐Oct‐18
25‐May‐17
13‐Sep‐17
14‐Sep‐17
6‐Dec‐17
4‐Feb‐18
4‐Feb‐18
22‐Jul‐19
25‐May‐17
13‐Sep‐17
14‐Sep‐17
6‐Dec‐17
4‐Feb‐18
4‐Feb‐18
95%
95%
0%
0.132%
974
2
CIVIL
3963‐KAHN‐1‐66‐0003
OT
KHATIYAH NORTH DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.139%
17‐May‐17
27‐May‐17
1‐Jun‐17
2‐Jul‐17
23‐Jul‐17
2‐Aug‐17
31‐Oct‐18
25‐May‐17
18‐Sep‐17
19‐Sep‐17
25‐Oct‐17
25‐Oct‐17
13‐Feb‐18
22‐Jul‐19
25‐May‐17
18‐Sep‐17
19‐Sep‐17
25‐Oct‐17
25‐Oct‐17
13‐Feb‐18
95%
95%
0%
0.132%
0.132%
975
2
CIVIL
3963‐KAHN‐1‐51‐0001
OT
KHATIYAH NORTH DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS
1
A
0.278%
17‐May‐17
27‐May‐17
1‐Jun‐17
2‐Jul‐17
23‐Jul‐17
2‐Aug‐17
31‐Oct‐18
25‐May‐17
13‐Sep‐17
14‐Sep‐17
13‐Dec‐17
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
25‐May‐17
13‐Sep‐17
14‐Sep‐17
13‐Dec‐17
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.264%
0.264%
976
2
CIVIL
3963‐KAHN‐1‐51‐0002
OT
KHATIYAH NORTH DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS
1
A
0.139%
17‐May‐17
27‐May‐17
1‐Jun‐17
2‐Jul‐17
23‐Jul‐17
2‐Aug‐17
31‐Oct‐18
25‐May‐17
23‐Sep‐17
25‐Sep‐17
26‐Oct‐17
26‐Oct‐17
30‐Jan‐18
22‐Jul‐19
25‐May‐17
23‐Sep‐17
25‐Sep‐17
26‐Oct‐17
26‐Oct‐17
30‐Jan‐18
95%
95%
0%
0.132%
0.132%
977
2
CIVIL
17‐May‐17
KHATIYAH NORTH DEGASSING STATION FOUNDATION LOCATION PLAN
1
A
0.278%
27‐May‐17
1‐Jun‐17
2‐Jul‐17
31‐Oct‐18
25‐May‐17
3‐Oct‐17
14‐Nov‐17
7‐Mar‐18
22‐Jul‐19
25‐May‐17
3‐Oct‐17
14‐Nov‐17
7‐Mar‐18
978
2
CIVIL
3963‐KAHM‐1‐64‐0001
OT
KHATIYAH MAIN DEGASSING STATION PAVING LAYOUT & DETAILS
1
A
0.069%
28‐Apr‐17
8‐May‐17
13‐May‐17
13‐Jun‐17
4‐Jul‐17
14‐Jul‐17
31‐Oct‐18
5‐Apr‐17
26‐Jun‐17
28‐Jun‐17
14‐Nov‐17
12‐Feb‐18
12‐Feb‐18
22‐Jul‐19
5‐Apr‐17
26‐Jun‐17
28‐Jun‐17
14‐Nov‐17
12‐Feb‐18
12‐Feb‐18
95%
95%
0%
0.066%
0.066%
979
2
CIVIL
3963‐KAHM‐1‐50‐0001
OT
KHATIYAH MAIN DEGASSING STATION GENERAL ARRANGEMENT CIVIL
1
A
0.069%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
24‐Sep‐17
26‐Sep‐17
5‐Nov‐17
5‐Nov‐17
22‐Feb‐18
22‐Jul‐19
1‐Jun‐17
24‐Sep‐17
26‐Sep‐17
5‐Nov‐17
5‐Nov‐17
22‐Feb‐18
95%
95%
0%
0.066%
0.066%
8‐May‐17
13‐May‐17
980
OT
KHATIYAH MAIN DEGASSING STATION DRAINAGE LAYOUT & DETAILS
1
28‐Apr‐17
14‐Jul‐17
25‐Jun‐17
12‐Feb‐18
7‐Mar‐18
95%
0%
0.264%
0.066%
0.264%
13‐Jun‐17
4‐Jul‐17
31‐Oct‐18
5‐Apr‐17
27‐Jun‐17
15‐Nov‐17
22‐Jul‐19
5‐Apr‐17
27‐Jun‐17
15‐Nov‐17
OT
KHATIYAH MAIN DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS
1
A
0.139%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
18‐Sep‐17
20‐Sep‐17
2‐Nov‐17
2‐Nov‐17
7‐Feb‐18
22‐Jul‐19
25‐May‐17
18‐Sep‐17
20‐Sep‐17
2‐Nov‐17
2‐Nov‐17
7‐Feb‐18
95%
95%
0%
0.132%
0.132%
KHATIYAH MAIN DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.139%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
26‐Sep‐17
28‐Sep‐17
5‐Dec‐17
13‐Feb‐18
13‐Feb‐18
22‐Jul‐19
1‐Jun‐17
26‐Sep‐17
28‐Sep‐17
5‐Dec‐17
13‐Feb‐18
13‐Feb‐18
95%
95%
0%
0.132%
0.132%
2‐Oct‐17
15‐Nov‐17
2‐Oct‐17
15‐Nov‐17
8‐Feb‐18
95%
0%
OT
8‐Feb‐18
12‐Feb‐18
95%
3963‐KAHM‐1‐66‐0002
22‐Jul‐19
12‐Feb‐18
95%
3963‐KAHM‐1‐66‐0003
8‐Feb‐18
25‐Jun‐17
7‐Mar‐18
CIVIL
8‐Feb‐18
12‐Feb‐18
1‐Oct‐17
CIVIL
A
0.069%
1‐Oct‐17
2
1
B
2‐Aug‐17
2
CIVIL
3963‐KAHM‐1‐50‐0002
23‐Jul‐17
981
2
CIVIL
OT
982 983
2
3963‐KAHN‐1‐50‐0003
0.132%
0.066%
3963‐KAHM‐1‐51‐0001
OT
KHATIYAH MAIN DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS
0.278%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
30‐Sep‐17
1‐Jun‐17
30‐Sep‐17
95%
95%
0%
0.264%
0.264%
984
2
CIVIL
3963‐KAHM‐1‐51‐0002
OT
KHATIYAH MAIN DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS
1
A
0.139%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
29‐Sep‐17
1‐Oct‐17
2‐Nov‐17
2‐Nov‐17
4‐Feb‐18
22‐Jul‐19
1‐Jun‐17
29‐Sep‐17
1‐Oct‐17
2‐Nov‐17
2‐Nov‐17
4‐Feb‐18
95%
95%
0%
0.132%
0.132%
985
2
CIVIL
3963‐KAHM‐1‐50‐0003
OT
KHATIYAH MAIN DEGASSING STATION FOUNDATION LOCATION PLAN
1
A
0.278%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
3‐Oct‐17
5‐Oct‐17
15‐Apr‐18
15‐Apr‐18
15‐Apr‐18
22‐Jul‐19
25‐May‐17
3‐Oct‐17
5‐Oct‐17
15‐Apr‐18
15‐Apr‐18
15‐Apr‐18
95%
95%
0%
0.264%
0.264%
986
2
CIVIL
3963‐KAHS‐1‐64‐0001
OT
KHATIYAH SOUTH DEGASSING STATION PAVING LAYOUT & DETAILS
1
A
0.069%
5‐May‐17
15‐May‐17
20‐May‐17
20‐Jun‐17
11‐Jul‐17
21‐Jul‐17
31‐Oct‐18
22‐Mar‐17
18‐Nov‐17
20‐Nov‐17
18‐Jan‐18
20‐Jan‐18
20‐Jan‐18
22‐Jul‐19
22‐Mar‐17
18‐Nov‐17
20‐Nov‐17
18‐Jan‐18
20‐Jan‐18
20‐Jan‐18
95%
95%
0%
0.066%
0.066%
987
2
CIVIL
3963‐KAHS‐1‐50‐0001
OT
KHATIYAH SOUTH DEGASSING STATION GENERAL ARRANGEMENT CIVIL
1
A
0.069%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
13‐Jul‐17
24‐Sep‐17
26‐Sep‐17
5‐Nov‐17
5‐Nov‐17
25‐Feb‐18
22‐Jul‐19
13‐Jul‐17
24‐Sep‐17
26‐Sep‐17
5‐Nov‐17
5‐Nov‐17
25‐Feb‐18
95%
95%
0%
0.066%
0.066%
988
2
CIVIL
3963‐KAHS‐1‐50‐0002
OT
KHATIYAH SOUTH DEGASSING STATION DRAINAGE LAYOUT & DETAILS
1
B
0.139%
5‐May‐17
15‐May‐17
20‐May‐17
20‐Jun‐17
11‐Jul‐17
21‐Jul‐17
31‐Oct‐18
22‐Mar‐17
25‐Sep‐17
27‐Sep‐17
16‐Nov‐17
4‐Feb‐18
22‐Jul‐19
22‐Mar‐17
25‐Sep‐17
27‐Sep‐17
16‐Nov‐17
4‐Feb‐18
95%
95%
0%
0.132%
0.132%
989
2
CIVIL
3963‐KAHS‐1‐66‐0002
OT
KHATIYAH SOUTH DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS
1
A
0.139%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
13‐Jul‐17
24‐Sep‐17
26‐Sep‐17
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
13‐Jul‐17
24‐Sep‐17
26‐Sep‐17
5‐Feb‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.132%
0.132%
990
2
CIVIL
3963‐KAHS‐1‐66‐0003
OT
KHATIYAH SOUTH DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS
1
B
0.069%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
13‐Jul‐17
29‐Sep‐17
1‐Oct‐17
6‐Dec‐17
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
13‐Jul‐17
29‐Sep‐17
1‐Oct‐17
6‐Dec‐17
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.066%
0.066%
991
2
CIVIL
3963‐KAHS‐1‐51‐0001
OT
KHATIYAH SOUTH DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS
1
B
0.278%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
8‐Jul‐17
1‐Oct‐17
3‐Oct‐17
16‐Nov‐17
12‐Feb‐18
12‐Feb‐18
22‐Jul‐19
8‐Jul‐17
1‐Oct‐17
3‐Oct‐17
16‐Nov‐17
12‐Feb‐18
12‐Feb‐18
95%
95%
0%
0.264%
0.264%
Page 8 of 13
4‐Feb‐18
4‐Feb‐18
Page 79 of 170
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC NO
ITEM CODE
DOC DESC
DOC CLASS
CURRENT REVISION
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100%
ACTIAFC
ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
SRN
SEQ
WV
PLS
PLD
PLIFC
PLIFA
PLASBUILT
PLS
PLIAFC
PLASBUILT
ACTS
992
2
CIVIL
3963‐KAHS‐1‐51‐0002
0.139%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
8‐Jul‐17
3‐Oct‐17
5‐Oct‐17
6‐Dec‐17
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
8‐Jul‐17
3‐Oct‐17
5‐Oct‐17
6‐Dec‐17
5‐Feb‐18
5‐Feb‐18
993
2
CIVIL
3963‐KAHS‐1‐50‐0003
OT
KHATIYAH SOUTH DEGASSING STATION FOUNDATION LOCATION PLAN
1
A
0.278%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
8‐Jul‐17
11‐Oct‐17
12‐Oct‐17
11‐Jan‐18
12‐Mar‐18
12‐Mar‐18
22‐Jul‐19
8‐Jul‐17
11‐Oct‐17
12‐Oct‐17
11‐Jan‐18
12‐Mar‐18
12‐Mar‐18
95%
95%
0%
0.264%
0.264%
994
2
CIVIL
3963‐FAHN‐1‐64‐0001
OT
FAHAHIL NORTH DEGASSING STATION PAVING LAYOUT & DETAILS
1
A
0.069%
12‐May‐17
22‐May‐17
27‐May‐17
27‐Jun‐17
18‐Jul‐17
28‐Jul‐17
31‐Oct‐18
25‐May‐17
18‐Sep‐17
19‐Sep‐17
7‐Nov‐17
7‐Nov‐17
18‐Feb‐18
22‐Jul‐19
25‐May‐17
18‐Sep‐17
19‐Sep‐17
7‐Nov‐17
7‐Nov‐17
18‐Feb‐18
95%
95%
0%
0.066%
0.066%
995
2
CIVIL
3963‐FAHN‐1‐50‐0001
OT
FAHAHIL NORTH DEGASSING STATION GENERAL ARRANGEMENT CIVIL
1
A
0.069%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
22‐Jun‐17
10‐Oct‐17
12‐Oct‐17
6‐Nov‐17
6‐Nov‐17
20‐Nov‐17
22‐Jul‐19
22‐Jun‐17
10‐Oct‐17
12‐Oct‐17
6‐Nov‐17
6‐Nov‐17
20‐Nov‐17
95%
95%
0%
0.066%
0.066%
13‐Nov‐17
13‐Nov‐17
996
DOC NO
OT
CURRENT REVISION A
Original BL WV
ITEM DOC DESC CODE OT KHATIYAH SOUTH DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS
DISCIPLINE
DOC CLASS 1
SHUTD OWN PACKA GE SHUTD OWN
PLIAWH
PLIAFC
PLD
PLIFC
PLIFA
PLIAWH
5‐Mar‐18
ACTD
ACTIFC
ACTIFA
ACTIAWH
5‐Mar‐18
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
Plan WF 0.132%
Actual WF 0.132%
2
CIVIL
3963‐FAHN‐1‐50‐0002
FAHAHIL NORTH DEGASSING STATION DRAINAGE LAYOUT & DETAILS
1
A
0.069%
12‐May‐17
22‐May‐17
27‐May‐17
27‐Jun‐17
18‐Jul‐17
28‐Jul‐17
31‐Oct‐18
25‐May‐17
18‐Sep‐17
19‐Sep‐17
5‐Mar‐18
22‐Jul‐19
25‐May‐17
18‐Sep‐17
19‐Sep‐17
5‐Mar‐18
95%
95%
0%
0.066%
0.066%
997
2
CIVIL
3963‐FAHN‐1‐66‐0001
OT
FAHAHIL NORTH DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS
1
A
0.139%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
22‐Jun‐17
28‐Aug‐17
29‐Aug‐17
1‐Nov‐17
1‐Nov‐17
29‐Jan‐18
22‐Jul‐19
22‐Jun‐17
28‐Aug‐17
29‐Aug‐17
1‐Nov‐17
1‐Nov‐17
29‐Jan‐18
95%
95%
0%
0.132%
0.132%
998
2
CIVIL
3963‐FAHN‐1‐66‐0002
OT
FAHAHIL NORTH DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS
1
A
0.139%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
22‐Jun‐17
3‐Oct‐17
5‐Oct‐17
11‐Dec‐17
15‐Feb‐18
15‐Feb‐18
22‐Jul‐19
22‐Jun‐17
3‐Oct‐17
5‐Oct‐17
11‐Dec‐17
15‐Feb‐18
15‐Feb‐18
95%
95%
0%
0.132%
0.132%
999
2
CIVIL
3963‐FAHN‐1‐66‐0003
OT
FAHAHIL NORTH DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.111%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
22‐Jun‐17
21‐Aug‐17
24‐Aug‐17
7‐Nov‐17
7‐Nov‐17
1‐Mar‐18
22‐Jul‐19
22‐Jun‐17
21‐Aug‐17
24‐Aug‐17
7‐Nov‐17
7‐Nov‐17
1‐Mar‐18
95%
95%
0%
0.106%
1000
2
CIVIL
3963‐FAHN‐1‐51‐0001
OT
FAHAHIL NORTH DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS
1
A
0.111%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
21‐Jun‐17
12‐Aug‐17
14‐Aug‐17
6‐Sep‐17
20‐Sep‐17
1‐Mar‐18
22‐Jul‐19
21‐Jun‐17
12‐Aug‐17
14‐Aug‐17
6‐Sep‐17
20‐Sep‐17
1‐Mar‐18
95%
95%
0%
0.106%
0.106%
1001
2
CIVIL
3963‐FAHN‐1‐51‐0002
OT
FAHAHIL NORTH DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS
1
A
0.333%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
21‐Jun‐17
18‐Oct‐17
19‐Oct‐17
27‐Feb‐18
19‐Mar‐18
19‐Mar‐18
22‐Jul‐19
21‐Jun‐17
18‐Oct‐17
19‐Oct‐17
27‐Feb‐18
19‐Mar‐18
19‐Mar‐18
95%
95%
0%
0.317%
0.317%
1002
2
CIVIL
3963‐FAHN‐1‐50‐0003
OT
FAHAHIL NORTH DEGASSING STATION FOUNDATION LOCATION PLAN
1
A
0.278%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
21‐Jun‐17
28‐Oct‐17
29‐Oct‐17
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
22‐Jul‐19
21‐Jun‐17
28‐Oct‐17
29‐Oct‐17
18‐Mar‐18
18‐Mar‐18
18‐Mar‐18
95%
95%
0%
0.264%
0.264%
1003
2
CIVIL
3963‐FAHM‐1‐64‐0001
OT
FAHAHIL MAIN DEGASSING STATION PAVING LAYOUT & DETAILS
1
A
0.069%
17‐May‐17
27‐May‐17
1‐Jun‐17
2‐Jul‐17
23‐Jul‐17
2‐Aug‐17
31‐Oct‐18
25‐May‐17
3‐Jul‐17
4‐Jul‐17
6‐Nov‐17
6‐Nov‐17
21‐Feb‐18
22‐Jul‐19
25‐May‐17
3‐Jul‐17
4‐Jul‐17
6‐Nov‐17
6‐Nov‐17
21‐Feb‐18
95%
95%
0%
0.066%
0.066%
1004
2
CIVIL
3963‐FAHM‐1‐50‐0001
OT
FAHAHIL MAIN DEGASSING STATION GENERAL ARRANGEMENT CIVIL
1
A
0.069%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
5‐Jul‐17
10‐Oct‐17
14‐Dec‐17
8‐Apr‐18
25‐Apr‐18
25‐Apr‐18
22‐Jul‐19
5‐Jul‐17
10‐Oct‐17
14‐Dec‐17
8‐Apr‐18
25‐Apr‐18
25‐Apr‐18
95%
95%
0%
0.066%
0.066%
1005
2
CIVIL
3963‐FAHM‐1‐50‐0002
OT
FAHAHIL MAIN DEGASSING STATION DRAINAGE LAYOUT & DETAILS
1
A
0.069%
17‐May‐17
27‐May‐17
1‐Jun‐17
2‐Jul‐17
23‐Jul‐17
2‐Aug‐17
31‐Oct‐18
25‐May‐17
3‐Jul‐17
4‐Jul‐17
5‐Mar‐18
5‐Mar‐18
5‐Mar‐18
22‐Jul‐19
25‐May‐17
3‐Jul‐17
4‐Jul‐17
5‐Mar‐18
5‐Mar‐18
5‐Mar‐18
95%
95%
0%
0.066%
1006
2
CIVIL
3963‐FAHM‐1‐66‐0001
OT
FAHAHIL MAIN DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS
1
A
0.139%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
3‐Jul‐17
25‐Sep‐17
27‐Sep‐17
1‐Nov‐17
1‐Nov‐17
29‐Jan‐18
22‐Jul‐19
3‐Jul‐17
25‐Sep‐17
27‐Sep‐17
1‐Nov‐17
1‐Nov‐17
29‐Jan‐18
95%
95%
0%
0.132%
0.132%
1007
2
CIVIL
3963‐FAHM‐1‐66‐0002
OT
FAHAHIL MAIN DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS
1
A
0.139%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
3‐Jul‐17
10‐Oct‐17
12‐Oct‐17
2‐Nov‐17
2‐Nov‐17
15‐Feb‐18
22‐Jul‐19
3‐Jul‐17
10‐Oct‐17
12‐Oct‐17
2‐Nov‐17
2‐Nov‐17
15‐Feb‐18
95%
95%
0%
0.132%
0.132%
1008
2
CIVIL
3963‐FAHM‐1‐66‐0003
OT
FAHAHIL MAIN DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.139%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
3‐Jul‐17
15‐Oct‐17
16‐Oct‐17
7‐Dec‐17
5‐Apr‐18
5‐Apr‐18
22‐Jul‐19
3‐Jul‐17
15‐Oct‐17
16‐Oct‐17
7‐Dec‐17
5‐Apr‐18
5‐Apr‐18
95%
95%
0%
0.132%
0.132%
1009
2
CIVIL
1
A
0.139%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
10‐Sep‐17
20‐Sep‐17
7‐Dec‐17
29‐Apr‐18
29‐Apr‐18
7‐Dec‐17
29‐Apr‐18
29‐Apr‐18
95%
95%
0%
0.132%
0.132%
1010
2
CIVIL
3963‐FAHM‐1‐51‐0002
OT
FAHAHIL MAIN DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS
1
A
0.278%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
4‐Jul‐17
10‐Oct‐17
12‐Oct‐17
2‐Nov‐17
2‐Nov‐17
26‐Feb‐18
22‐Jul‐19
4‐Jul‐17
10‐Oct‐17
12‐Oct‐17
2‐Nov‐17
2‐Nov‐17
26‐Feb‐18
95%
95%
0%
0.264%
1011
2
CIVIL
3963‐FAHM‐1‐50‐0003
OT
FAHAHIL MAIN DEGASSING STATION FOUNDATION LOCATION PLAN
1
0
0.278%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
4‐Jul‐17
22‐Oct‐17
24‐Oct‐17
25‐Mar‐18
2‐Apr‐18
2‐Apr‐18
22‐Jul‐19
4‐Jul‐17
22‐Oct‐17
24‐Oct‐17
25‐Mar‐18
2‐Apr‐18
2‐Apr‐18
95%
95%
0%
0.264%
0.264%
1012
2
CIVIL
3963‐FAHS‐1‐64‐0001
OT
FAHAHIL SOUTH DEGASSING STATION SITE GRADING LAYOUT & DETAILS
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
10‐Oct‐17
12‐Oct‐17
13‐Nov‐17
5‐Apr‐18
5‐Apr‐18
22‐Jul‐19
25‐May‐17
10‐Oct‐17
12‐Oct‐17
13‐Nov‐17
5‐Apr‐18
5‐Apr‐18
95%
95%
0%
0.066%
0.066%
1013
2
CIVIL
3963‐FAHS‐1‐50‐0001
OT
FAHAHIL SOUTH DEGASSING STATION GENERAL ARRANGEMENT CIVIL
1
1
0.069%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
11‐Jul‐17
6‐Oct‐17
20‐Nov‐17
3‐Apr‐18
3‐Apr‐18
3‐Apr‐18
22‐Jul‐19
11‐Jul‐17
6‐Oct‐17
20‐Nov‐17
3‐Apr‐18
3‐Apr‐18
3‐Apr‐18
95%
95%
0%
0.066%
0.066%
1014
2
CIVIL
3963‐FAHS‐1‐50‐0002
OT
FAHAHIL SOUTH DEGASSING STATION DRAINAGE LAYOUT & DETAILS
1
1
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
5‐Oct‐17
11‐Apr‐18
11‐Apr‐18
22‐Jul‐19
25‐May‐17
5‐Oct‐17
11‐Apr‐18
11‐Apr‐18
1015
2
CIVIL
3963‐FAHS‐1‐66‐0001
OT
FAHAHIL SOUTH DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS
1
A
0.139%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
10‐Oct‐17
12‐Oct‐17
1‐Nov‐17
1‐Nov‐17
29‐Jan‐18
22‐Jul‐19
8‐Jul‐17
10‐Oct‐17
12‐Oct‐17
1‐Nov‐17
1‐Nov‐17
29‐Jan‐18
95%
95%
0%
0.132%
0.132%
1016
2
CIVIL
3963‐FAHS‐1‐66‐0002
OT
FAHAHIL SOUTH DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS
1
A
0.139%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
10‐Oct‐17
12‐Oct‐17
2‐Nov‐17
2‐Nov‐17
15‐Feb‐18
22‐Jul‐19
8‐Jul‐17
10‐Oct‐17
12‐Oct‐17
2‐Nov‐17
2‐Nov‐17
15‐Feb‐18
95%
95%
0%
0.132%
0.132%
1017
2
CIVIL
3963‐FAHS‐1‐66‐0003
OT
FAHAHIL SOUTH DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.139%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
23‐Oct‐17
25‐Oct‐17
19‐Nov‐17
14‐Mar‐18
14‐Mar‐18
22‐Jul‐19
8‐Jul‐17
23‐Oct‐17
25‐Oct‐17
19‐Nov‐17
14‐Mar‐18
14‐Mar‐18
95%
95%
0%
0.132%
3963‐FAHM‐1‐51‐0001
OT
FAHAHIL MAIN DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS
20‐Aug‐17
9‐Jul‐17
30‐Jul‐17
31‐Oct‐18
4‐Jul‐17
2‐Aug‐17
3‐Oct‐17
3‐Aug‐17
11‐Apr‐18
22‐Jul‐19
4‐Jul‐17
2‐Aug‐17
3‐Oct‐17
3‐Aug‐17
11‐Apr‐18
95%
95%
0%
0.066%
0.106%
0.066%
0.264%
0.066%
0.132%
1018
2
CIVIL
3963‐FAHS‐1‐51‐0001
OT
FAHAHIL SOUTH DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS
1
A
0.278%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
11‐Jul‐17
25‐Oct‐17
26‐Oct‐17
6‐Dec‐17
13‐Mar‐18
13‐Mar‐18
22‐Jul‐19
11‐Jul‐17
25‐Oct‐17
26‐Oct‐17
6‐Dec‐17
13‐Mar‐18
13‐Mar‐18
95%
95%
0%
0.264%
0.264%
1019
2
CIVIL
3963‐FAHS‐1‐51‐0002
OT
FAHAHIL SOUTH DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS
1
A
0.139%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
10‐Oct‐17
12‐Oct‐17
2‐Nov‐17
2‐Nov‐17
1‐Mar‐18
22‐Jul‐19
8‐Jul‐17
10‐Oct‐17
12‐Oct‐17
2‐Nov‐17
2‐Nov‐17
1‐Mar‐18
95%
95%
0%
0.132%
0.132%
1020
2
CIVIL
3963‐FAHS‐1‐50‐0003
OT
FAHAHIL SOUTH DEGASSING STATION FOUNDATION LOCATION PLAN
1
A
0.278%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
20‐Oct‐17
22‐Oct‐17
23‐Apr‐18
22‐Jul‐19
8‐Jul‐17
20‐Oct‐17
22‐Oct‐17
23‐Apr‐18
95%
95%
0%
0.264%
0.264%
1021
2
CIVIL
3963‐JALM‐1‐64‐0002
OT
JALEHA MAIN DEGASSING STATION ROAD & PAVING LAYOUT & DETAILS
1
0
0.167%
7‐Jun‐17
17‐Jun‐17
22‐Jun‐17
23‐Jul‐17
13‐Aug‐17
23‐Aug‐17
31‐Oct‐18
7‐Jun‐17
1‐Oct‐17
3‐Oct‐17
4‐May‐18
24‐Sep‐18
24‐Sep‐18
22‐Jul‐19
7‐Jun‐17
1‐Oct‐17
3‐Oct‐17
4‐May‐18
24‐Sep‐18
24‐Sep‐18
95%
95%
0%
0.159%
1022
2
CIVIL
3963‐JALM‐1‐50‐0001
OT
JALEHA MAIN DEGASSING STATION GENERAL ARRANGEMENT CIVIL
1
1
0.097%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
3‐Oct‐17
5‐Oct‐17
24‐Dec‐17
27‐May‐18
27‐May‐18
22‐Jul‐19
8‐Jul‐17
3‐Oct‐17
5‐Oct‐17
24‐Dec‐17
27‐May‐18
27‐May‐18
95%
95%
0%
0.092%
0.092%
1023
2
CIVIL
3963‐JALM‐1‐66‐0001
OT
JALEHA MAIN DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS
1
A
0.139%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
17‐Oct‐17
18‐Oct‐17
27‐Dec‐17
11‐Mar‐18
11‐Mar‐18
22‐Jul‐19
13‐Jul‐17
17‐Oct‐17
18‐Oct‐17
27‐Dec‐17
11‐Mar‐18
11‐Mar‐18
95%
95%
0%
0.132%
0.132%
1024
2
CIVIL
3963‐JALM‐1‐66‐0003
OT
JALEHA MAIN DEGASSING STATION TEST SEPARATOR PLATFORM FOUNDATION GA & RC DETAILS
1
0
0.139%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
17‐Oct‐17
19‐Oct‐17
11‐Apr‐18
11‐Apr‐18
11‐Apr‐18
22‐Jul‐19
13‐Jul‐17
17‐Oct‐17
19‐Oct‐17
11‐Apr‐18
11‐Apr‐18
11‐Apr‐18
95%
95%
0%
0.132%
0.132%
1025
2
CIVIL
3963‐JALM‐1‐51‐0001
OT
JALEHA MAIN DEGASSING STATION TEST SEPARATOR PLATFORM STRUCTURAL GA & DETAILS
1
1
0.10%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
11‐Jul‐17
8‐Nov‐17
15‐Nov‐17
29‐Nov‐17
1‐May‐18
1‐May‐18
22‐Jul‐19
11‐Jul‐17
8‐Nov‐17
15‐Nov‐17
29‐Nov‐17
1‐May‐18
1‐May‐18
95%
95%
0%
0.092%
0.092%
1026
2
CIVIL
3963‐JALM‐1‐51‐0002
OT
JALEHA MAIN DEGASSING STATION METERING SKID PLATFORM STRUCTURAL GA & DETAILS
1
0
0.139%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
18‐Oct‐17
19‐Oct‐17
20‐Mar‐18
29‐Apr‐18
29‐Apr‐18
22‐Jul‐19
8‐Jul‐17
18‐Oct‐17
19‐Oct‐17
20‐Mar‐18
29‐Apr‐18
29‐Apr‐18
95%
95%
0%
0.132%
1027
2
CIVIL
3963‐JALM‐1‐50‐0003
OT
JALEHA MAIN DEGASSING STATION FOUNDATION LOCATION PLAN
1
0
0.097%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
8‐Jul‐17
6‐Nov‐17
8‐Nov‐17
27‐May‐18
28‐Jun‐18
28‐Jun‐18
22‐Jul‐19
8‐Jul‐17
6‐Nov‐17
8‐Nov‐17
27‐May‐18
28‐Jun‐18
28‐Jun‐18
95%
95%
0%
0.092%
0.092%
1028
2
CIVIL
DEM‐3963‐KAHN‐1‐50‐0001
DEM
KHATIYAH NORTH DEGASSING STATION EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING
3
A
0.083%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
19‐Jul‐17
20‐Jul‐17
13‐Aug‐17
22‐Aug‐17
23‐Aug‐17
22‐Jul‐19
1‐Jun‐17
19‐Jul‐17
20‐Jul‐17
13‐Aug‐17
22‐Aug‐17
23‐Aug‐17
95%
95%
0%
0.079%
0.079%
1029
2
CIVIL
DEM‐3963‐KAHN‐1‐50‐0002
DEM
KHATIYAH NORTH DEGASSING STATION EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAW
3
A
0.097%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
19‐Jul‐17
20‐Jul‐17
13‐Aug‐17
22‐Aug‐17
23‐Aug‐17
22‐Jul‐19
31‐May‐17
19‐Jul‐17
20‐Jul‐17
13‐Aug‐17
22‐Aug‐17
23‐Aug‐17
95%
95%
0%
0.092%
1‐Apr‐18
23‐Apr‐18
1‐Apr‐18
23‐Apr‐18
0.159%
0.132%
0.092%
1030
2
CIVIL
DEM‐3963‐KAHM‐1‐50‐0001
DEM
KHATIYAH MAIN DEGASSING STATION EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING
3
A
0.083%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
19‐Jul‐17
20‐Jul‐17
10‐Aug‐17
22‐Aug‐17
23‐Aug‐17
22‐Jul‐19
31‐May‐17
19‐Jul‐17
20‐Jul‐17
10‐Aug‐17
22‐Aug‐17
23‐Aug‐17
95%
95%
0%
0.079%
0.079%
1031
2
CIVIL
DEM‐3963‐KAHM‐1‐50‐0002
DEM
KHATIYAH MAIN DEGASSING STATION EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAW
3
A
0.083%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
19‐Jul‐17
20‐Jul‐17
10‐Aug‐17
22‐Aug‐17
23‐Aug‐17
22‐Jul‐19
31‐May‐17
19‐Jul‐17
20‐Jul‐17
10‐Aug‐17
22‐Aug‐17
23‐Aug‐17
95%
95%
0%
0.079%
0.079%
KHATIYAH SOUTH DEGASSING STATION EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING
3
0.083%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
19‐Jul‐17
20‐Jul‐17
19‐Jul‐17
20‐Jul‐17
95%
95%
0%
0.079%
0.079%
1032
2
CIVIL
31‐Oct‐18
31‐May‐17
17‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
31‐May‐17
17‐Aug‐17
27‐Aug‐17
29‐Aug‐17
1033
2
CIVIL
DEM‐3963‐KAHS‐1‐50‐0002
DEM
KHATIYAH SOUTH DEGASSING STATION EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAW
3
A
0.083%
31‐May‐17
10‐Jun‐17
15‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
31‐May‐17
19‐Jul‐17
20‐Jul‐17
17‐Aug‐17
27‐Aug‐17
29‐Aug‐17
22‐Jul‐19
31‐May‐17
19‐Jul‐17
20‐Jul‐17
17‐Aug‐17
27‐Aug‐17
29‐Aug‐17
95%
95%
0%
0.079%
1034
2
CIVIL
DEM‐3963‐FAHN‐1‐50‐0001
DEM
FAHAHIL NORTH DEGASSING STATION EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING
3
A
0.097%
31‐May‐17
10‐Jun‐17
22‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
24‐Aug‐17
13‐Sep‐17
14‐Sep‐17
22‐Jul‐19
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
24‐Aug‐17
13‐Sep‐17
14‐Sep‐17
95%
95%
0%
0.092%
0.092%
1035
2
CIVIL
DEM‐3963‐FAHN‐1‐50‐0002
DEM
FAHAHIL NORTH DEGASSING STATION EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAW
3
A
0.097%
31‐May‐17
10‐Jun‐17
22‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
24‐Aug‐17
13‐Sep‐17
14‐Sep‐17
22‐Jul‐19
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
24‐Aug‐17
13‐Sep‐17
14‐Sep‐17
95%
95%
0%
0.092%
0.092%
1036
2
CIVIL
DEM‐3963‐FAHM‐1‐50‐0001
DEM
FAHAHIL MAIN DEGASSING STATION EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING
3
0.083%
31‐May‐17
10‐Jun‐17
22‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
20‐Jul‐17
10‐Aug‐17
22‐Aug‐17
23‐Aug‐17
20‐Jul‐17
10‐Aug‐17
22‐Aug‐17
23‐Aug‐17
1037
2
CIVIL
DEM‐3963‐FAHM‐1‐50‐0002
DEM
FAHAHIL MAIN DEGASSING STATION EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAWIN
3
A
0.097%
31‐May‐17
10‐Jun‐17
22‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
19‐Jul‐17
20‐Jul‐17
10‐Aug‐17
22‐Aug‐17
23‐Aug‐17
22‐Jul‐19
1‐Jun‐17
19‐Jul‐17
20‐Jul‐17
10‐Aug‐17
22‐Aug‐17
23‐Aug‐17
95%
95%
0%
0.092%
0.092%
1038
2
CIVIL
DEM‐3963‐FAHS‐1‐50‐0001
DEM
FAHAHIL SOUTH DEGASSING STATION EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING
3
A
0.083%
31‐May‐17
10‐Jun‐17
22‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
30‐Jul‐17
31‐Jul‐17
3‐Sep‐17
19‐Sep‐17
20‐Sep‐17
22‐Jul‐19
1‐Jun‐17
30‐Jul‐17
31‐Jul‐17
3‐Sep‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.079%
0.079%
1039
2
CIVIL
DEM‐3963‐FAHS‐1‐50‐0002
DEM
FAHAHIL SOUTH DEGASSING STATION EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAWI
3
A
0.083%
31‐May‐17
10‐Jun‐17
22‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
30‐Jul‐17
31‐Jul‐17
3‐Sep‐17
19‐Sep‐17
20‐Sep‐17
22‐Jul‐19
1‐Jun‐17
30‐Jul‐17
31‐Jul‐17
3‐Sep‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.079%
0.079%
1040
2
CIVIL
DEM‐3963‐JALM‐1‐50‐0001
DEM
JALEHA MAIN DEGASSING STATION EXISTING TEST SEPERATOR ‐STEEL WORK DEMOLITION DRAWING
3
A
0.083%
31‐May‐17
10‐Jun‐17
22‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
29‐Aug‐17
20‐Sep‐17
21‐Nov‐17
22‐Jul‐19
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
29‐Aug‐17
20‐Sep‐17
21‐Nov‐17
95%
95%
0%
0.079%
0.079%
1041
2
CIVIL
DEM‐3963‐JALM‐1‐50‐0002
DEM
JALEHA MAIN DEGASSING STATION EXISTING TEST SEPERATOR ‐CONCRETE WORK DEMOLITION DRAWING
3
A
0.083%
31‐May‐17
10‐Jun‐17
22‐Jun‐17
16‐Jul‐17
6‐Aug‐17
16‐Aug‐17
31‐Oct‐18
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
29‐Aug‐17
3‐Oct‐17
3‐Oct‐17
22‐Jul‐19
1‐Jun‐17
25‐Jul‐17
26‐Jul‐17
29‐Aug‐17
3‐Oct‐17
3‐Oct‐17
95%
95%
0%
0.079%
0.079%
1042
2
CIVIL
3963‐DGEN‐1‐12‐0002
OT
DESIGN CALCULATION FOR METERING SKID FOUNDATION
1
A
0.208%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
13‐Jul‐17
25‐Sep‐17
27‐Sep‐17
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
13‐Jul‐17
25‐Sep‐17
27‐Sep‐17
7‐Feb‐18
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.198%
0.198%
1043
2
CIVIL
3963‐DGEN‐1‐12‐0003
OT
DESIGN CALCULATION FOR TEST SEPARATOR PLATFORM
1
1
0.994%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
13‐Jul‐17
28‐Aug‐17
29‐Aug‐17
19‐Nov‐17
26‐Apr‐18
26‐Apr‐18
22‐Jul‐19
13‐Jul‐17
28‐Aug‐17
29‐Aug‐17
19‐Nov‐17
26‐Apr‐18
26‐Apr‐18
95%
95%
0%
0.945%
0.945%
1044
2
CIVIL
3963‐DGEN‐1‐12‐0004
OT
DESIGN CALCULATION FOR PIPE SLEEPERS
1
1
0.194%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
13‐Jul‐17
28‐Oct‐17
29‐Oct‐17
20‐Dec‐17
15‐Apr‐18
15‐Apr‐18
22‐Jul‐19
13‐Jul‐17
28‐Oct‐17
29‐Oct‐17
20‐Dec‐17
15‐Apr‐18
15‐Apr‐18
95%
95%
0%
0.185%
1045
2
CIVIL
3963‐DGEN‐1‐12‐0005
OT
DESIGN CALCULATION FOR PIPE SUPPORTS
1
0
0.194%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
8‐Jul‐17
6‐Nov‐17
13‐Nov‐17
21‐Apr‐18
2‐May‐18
2‐May‐18
22‐Jul‐19
8‐Jul‐17
6‐Nov‐17
13‐Nov‐17
21‐Apr‐18
2‐May‐18
2‐May‐18
95%
95%
0%
0.185%
0.185%
1046
2
CIVIL
3963‐DGEN‐1‐57‐0005
OT
TYPICAL DETAILS OF FIRE PROOFING
1
A
0.111%
3‐May‐17
13‐May‐17
18‐May‐17
18‐Jun‐17
9‐Jul‐17
19‐Jul‐17
31‐Oct‐18
8‐Jun‐17
13‐Jun‐17
14‐Jun‐17
13‐Jul‐17
13‐Jul‐17
18‐Jul‐17
22‐Jul‐19
8‐Jun‐17
13‐Jun‐17
14‐Jun‐17
13‐Jul‐17
13‐Jul‐17
18‐Jul‐17
95%
95%
0%
0.106%
0.106%
1047
2
CIVIL
3963‐KAHN‐1‐66‐0004
OT
KHATIYAH NORTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
12‐Oct‐17
11‐Oct‐17
12‐Oct‐17
30‐Oct‐17
30‐Oct‐17
29‐Jan‐18
22‐Jul‐19
12‐Oct‐17
11‐Oct‐17
12‐Oct‐17
30‐Oct‐17
30‐Oct‐17
29‐Jan‐18
95%
95%
0%
0.013%
0.013%
CIVIL
3963‐KAHM‐1‐66‐0004
KHATIYAH MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS
1
A
21‐Nov‐17
1048
DEM
A
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
19‐Jul‐17
21‐Nov‐17
1‐Jun‐17
19‐Jul‐17
95%
0%
0.079%
0.079%
0.185%
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Oct‐18
19‐Oct‐17
23‐Oct‐17
25‐Oct‐17
5‐Feb‐18
22‐Jul‐19
19‐Oct‐17
23‐Oct‐17
25‐Oct‐17
5‐Feb‐18
95%
95%
0%
0.013%
0.013%
2
CIVIL
3963‐KAHS‐1‐66‐0004
OT
KHATIYAH SOUTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
25‐Oct‐17
26‐Oct‐17
4‐Dec‐17
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
19‐Oct‐17
25‐Oct‐17
26‐Oct‐17
4‐Dec‐17
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.013%
0.013%
CIVIL
3963‐FAHN‐1‐66‐0004
OT
FAHAHIL NORTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
1‐Nov‐17
20‐Nov‐17
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
1‐Nov‐17
20‐Nov‐17
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.013%
0.013%
CIVIL
3963‐FAHM‐1‐66‐0004
OT
FAHAHIL MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
1‐Nov‐17
21‐Feb‐18
22‐Jul‐19
19‐Oct‐17
31‐Oct‐17
1‐Nov‐17
21‐Nov‐17
21‐Feb‐18
95%
95%
0%
0.013%
0.013%
1052
2
CIVIL
3963‐FAHS‐1‐66‐0004
OT
FAHAHIL SOUTH DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
1‐Nov‐17
2‐Nov‐17
21‐Nov‐17
22‐Feb‐18
22‐Feb‐18
22‐Jul‐19
19‐Oct‐17
1‐Nov‐17
2‐Nov‐17
21‐Nov‐17
22‐Feb‐18
22‐Feb‐18
95%
95%
0%
0.013%
0.013%
1053
2
CIVIL
3963‐JALM‐1‐66‐0004
OT
JALEHA MAIN DEGASSING STATION PSV PLATFORM FOUNDATION GA & RC DETAILS
1
1
0.046%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
5‐Nov‐17
7‐Nov‐17
27‐Nov‐17
20‐Mar‐18
20‐Mar‐18
22‐Jul‐19
19‐Oct‐17
5‐Nov‐17
7‐Nov‐17
27‐Nov‐17
20‐Mar‐18
20‐Mar‐18
95%
95%
0%
0.044%
0.044%
1054
2
OT
KHATIYAH NORTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS
1
B
0.014%
14‐Jul‐17
26‐Jul‐17
21‐Feb‐18
5‐Feb‐18
95%
2
21‐Nov‐17
5‐Feb‐18
22‐Jul‐19
0.079%
1049
2
OT
A
1050 1051
2
DEM‐3963‐KAHS‐1‐50‐0001
21‐Feb‐18
CIVIL
3963‐KAHN‐1‐51‐0003
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
23‐Sep‐17
24‐Sep‐17
26‐Sep‐17
29‐Oct‐17
29‐Oct‐17
27‐Nov‐17
22‐Jul‐19
23‐Sep‐17
24‐Sep‐17
26‐Sep‐17
29‐Oct‐17
29‐Oct‐17
27‐Nov‐17
95%
95%
0%
0.013%
0.013%
1055
2
CIVIL
3963‐KAHM‐1‐51‐0003
OT
KHATIYAH MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
25‐Oct‐17
26‐Oct‐17
4‐Dec‐17
4‐Feb‐18
4‐Feb‐18
22‐Jul‐19
19‐Oct‐17
25‐Oct‐17
26‐Oct‐17
4‐Dec‐17
4‐Feb‐18
4‐Feb‐18
95%
95%
0%
0.013%
0.013%
1056
2
CIVIL
3963‐KAHS‐1‐51‐0003
OT
KHATIYAH SOUTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
1‐Nov‐17
2‐Nov‐17
26‐Nov‐17
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
19‐Oct‐17
1‐Nov‐17
2‐Nov‐17
26‐Nov‐17
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.013%
0.013%
1057
2
CIVIL
3963‐FAHN‐1‐51‐0003
OT
FAHAHIL NORTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
1‐Nov‐17
2‐Nov‐17
26‐Nov‐17
26‐Feb‐18
26‐Feb‐18
22‐Jul‐19
19‐Oct‐17
1‐Nov‐17
2‐Nov‐17
26‐Nov‐17
26‐Feb‐18
26‐Feb‐18
95%
95%
0%
0.013%
0.013%
1058
2
CIVIL
3963‐FAHM‐1‐51‐0003
OT
FAHAHIL MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
1‐Nov‐17
2‐Nov‐17
26‐Nov‐17
21‐Feb‐18
21‐Feb‐18
22‐Jul‐19
19‐Oct‐17
1‐Nov‐17
2‐Nov‐17
26‐Nov‐17
21‐Feb‐18
21‐Feb‐18
95%
95%
0%
0.013%
0.013%
1
A
22‐Jul‐19
1059
2
CIVIL
1‐Nov‐17
26‐Nov‐17
28‐Feb‐18
28‐Feb‐18
1‐Nov‐17
26‐Nov‐17
28‐Feb‐18
28‐Feb‐18
1060
2
CIVIL
3963‐JALM‐1‐51‐0003
OT
JALEHA MAIN DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS
1
1
0.046%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
5‐Nov‐17
7‐Nov‐17
26‐Nov‐17
20‐Mar‐18
20‐Mar‐18
22‐Jul‐19
19‐Oct‐17
5‐Nov‐17
7‐Nov‐17
26‐Nov‐17
20‐Mar‐18
20‐Mar‐18
95%
95%
0%
0.044%
0.044%
1061
2
CIVIL
3963‐KAHN‐1‐51‐0004
OT
KHATIYAH NORTH EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS
1
B
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
4‐Dec‐17
13‐Dec‐17
13‐Dec‐17
22‐Jul‐19
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
4‐Dec‐17
13‐Dec‐17
13‐Dec‐17
95%
95%
0%
0.013%
0.013%
1062
2
CIVIL
3963‐KAHS‐1‐51‐0004
OT
KHATIYAH SOUTH EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS
1
A
0.014%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
4‐Dec‐17
13‐Dec‐17
13‐Dec‐17
22‐Jul‐19
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
4‐Dec‐17
13‐Dec‐17
13‐Dec‐17
95%
95%
0%
0.013%
0.013%
1
A
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
1063
OT
FAHAHIL SOUTH DEGASSING STATION PSV PLATFORM STRUCTURAL GA & DETAILS
0.014%
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
19‐Oct‐17
31‐Oct‐17
19‐Oct‐17
31‐Oct‐17
95%
95%
0%
0.013%
0.013%
CIVIL
3963‐KAHM‐1‐51‐0004
OT
KHATIYAH MAIN EARLY TIE IN PIPE SUPPORTS STRUCTURAL SCHEDULE & DETAILS
4‐Dec‐17
11‐Dec‐17
11‐Dec‐17
22‐Jul‐19
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
4‐Dec‐17
11‐Dec‐17
11‐Dec‐17
95%
95%
0%
0.000%
0.000%
2
CIVIL
3963‐KAHN‐1‐66‐0005
OT
KHATIYAH NORTH EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS
1
B
0.0%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
4‐Dec‐17
13‐Dec‐17
13‐Dec‐17
22‐Jul‐19
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
4‐Dec‐17
13‐Dec‐17
13‐Dec‐17
95%
95%
0%
0.000%
0.000%
CIVIL
3963‐KAHS‐1‐66‐0005
OT
KHATIYAH SOUTH EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS
1
B
0.000%
14‐Jul‐17
26‐Jul‐17
31‐Jul‐17
31‐Aug‐17
21‐Sep‐17
1‐Oct‐17
31‐Oct‐18
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
13‐Dec‐17
19‐Dec‐17
19‐Dec‐17
22‐Jul‐19
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
13‐Dec‐17
19‐Dec‐17
19‐Dec‐17
95%
95%
0%
0.000%
0.000%
26‐Jul‐17
31‐Jul‐17
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
28‐Nov‐17
28‐Nov‐17
29‐Nov‐17
CIVIL
3963‐KAHM‐1‐66‐0005
KHATIYAH MAIN EARLY TIE IN PIPE SUPPORTS FOUDATION SCHEDULE & DETAILS
1
4
CIVIL
3963‐DGEN‐1‐00‐0001
OT
MISCELLANEOUS ‐ CIVIL
0
2
CIVIL
3963‐JALM‐1‐66‐0002
OT
JALEHA MAIN DEGASSING STATION METERING SKID FOUNDATION GA & RC DETAILS
1
1069
2
CIVIL
3963‐KAHN‐1‐66‐0001
OT
KHATIYAH NORTH DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS
1070
2
CIVIL
3963‐KAHM‐1‐66‐0001
OT
KHATIYAH MAIN DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS
1071
2
CIVIL
3963‐KAHS‐1‐66‐0001
OT
KHATIYAH SOUTH DEGASSING STATION TEST SEPARATOR FOUNDATION GA & RC DETAILS
1
1072
2
CIVIL
3963‐DGEN‐1‐12‐0001
OT
DESIGN CALCULATION FOR TEST SEPARATOR FOUNDATION
1073
4
SAFETY
3963‐DGEN‐3‐04‐0002
OT
1074
4
SAFETY
3963‐DGEN‐3‐03‐0001
1075
4
SAFETY
1076
4
1077 1078 1079
2
0.000%
14‐Jul‐17
1‐Oct‐17
31‐Oct‐18
19‐Dec‐17
22‐Jul‐19
19‐Dec‐17
95%
95%
0%
0.000%
0.000%
0.000%
31‐Aug‐17
6‐Sep‐17
7‐Sep‐17
14‐Sep‐17
14‐Sep‐17
21‐Sep‐17
31‐Oct‐18
1‐Feb‐18
6‐Feb‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
22‐Jul‐19
1‐Feb‐18
6‐Feb‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
95%
95%
0%
0.000%
0.000%
A
0.171%
10‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
12‐Sep‐17
19‐Sep‐17
31‐Oct‐18
13‐Jul‐17
17‐Oct‐17
18‐Oct‐17
27‐Dec‐17
20‐Mar‐18
20‐Mar‐18
22‐Jul‐19
13‐Jul‐17
17‐Oct‐17
18‐Oct‐17
27‐Dec‐17
20‐Mar‐18
20‐Mar‐18
95%
95%
0%
0.163%
0.163%
1
B
0.139%
17‐May‐17
27‐May‐17
2‐Aug‐17
31‐Oct‐18
25‐May‐17
5‐Sep‐17
6‐Sep‐17
25‐Oct‐17
25‐Oct‐17
21‐Jan‐18
22‐Jul‐19
25‐May‐17
5‐Sep‐17
6‐Sep‐17
25‐Oct‐17
25‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.132%
0.132%
1
B
0.139%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
18‐Sep‐17
19‐Sep‐17
30‐Oct‐17
30‐Oct‐17
21‐Jan‐18
22‐Jul‐19
25‐May‐17
18‐Sep‐17
19‐Sep‐17
30‐Oct‐17
30‐Oct‐17
21‐Jan‐18
95%
95%
0%
0.132%
0.132%
B
0.139%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
13‐Jul‐17
18‐Sep‐17
20‐Sep‐17
1‐Nov‐17
1‐Nov‐17
21‐Jan‐18
22‐Jul‐19
13‐Jul‐17
18‐Sep‐17
20‐Sep‐17
1‐Nov‐17
1‐Nov‐17
21‐Jan‐18
95%
95%
0%
0.132%
0.132%
1
A
0.144%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
8‐Jul‐17
6‐Sep‐17
7‐Sep‐17
2‐Nov‐17
2‐Nov‐17
22‐Jan‐18
22‐Jul‐19
8‐Jul‐17
6‐Sep‐17
7‐Sep‐17
2‐Nov‐17
2‐Nov‐17
22‐Jan‐18
95%
95%
0%
0.137%
0.137%
PROJECT HSE PLAN
1
A
0.139%
1‐Apr‐17
11‐Apr‐17
16‐Apr‐17
17‐May‐17
7‐Jun‐17
17‐Jun‐17
31‐Oct‐18
26‐Mar‐17
29‐Mar‐17
5‐Apr‐17
5‐Apr‐17
8‐Jun‐17
8‐Jun‐17
22‐Jul‐19
26‐Mar‐17
29‐Mar‐17
5‐Apr‐17
5‐Apr‐17
8‐Jun‐17
8‐Jun‐17
95%
95%
0%
0.132%
0.132%
OT
FIRE & SAFETY PHILOSOPHY
1
B
0.139%
25‐Mar‐17
4‐Apr‐17
9‐Apr‐17
10‐May‐17
31‐May‐17
10‐Jun‐17
31‐Oct‐18
29‐Mar‐17
2‐Apr‐17
5‐Apr‐17
4‐May‐17
20‐Jun‐17
20‐Jun‐17
22‐Jul‐19
29‐Mar‐17
2‐Apr‐17
5‐Apr‐17
4‐May‐17
20‐Jun‐17
20‐Jun‐17
95%
95%
0%
0.132%
0.132%
3963‐DGEN‐3‐03‐0002
OT
HAZARDOUS AREA CLASSIFICATION PHILOSOPHY AND SCHEDULE FOR ALL DEGASSING STATIONS
1
B
0.139%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
3‐Apr‐17
19‐May‐17
21‐May‐17
4‐Jul‐17
13‐Jul‐17
18‐Jul‐17
22‐Jul‐19
3‐Apr‐17
19‐May‐17
21‐May‐17
4‐Jul‐17
13‐Jul‐17
18‐Jul‐17
95%
95%
0%
0.132%
SAFETY
3963‐DGEN‐3‐17‐0001
L
TERMS OF REFERENCE FOR HAZID
1
A
0.125%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
5‐Apr‐17
17‐Jul‐17
18‐Jul‐17
3‐Aug‐17
14‐Aug‐17
14‐Aug‐17
22‐Jul‐19
5‐Apr‐17
17‐Jul‐17
18‐Jul‐17
3‐Aug‐17
14‐Aug‐17
14‐Aug‐17
95%
95%
0%
0.119%
0.119%
4
SAFETY
3963‐DGEN‐3‐17‐0003
L
HAZID/ENVID CLOSE OUT REPORT
1
A
0.264%
15‐Jul‐17
25‐Jul‐17
30‐Jul‐17
30‐Aug‐17
13‐Sep‐17
20‐Sep‐17
31‐Oct‐18
14‐Nov‐17
16‐Dec‐17
17‐Dec‐17
22‐Jan‐18
5‐Feb‐18
5‐Feb‐18
22‐Jul‐19
14‐Nov‐17
16‐Dec‐17
17‐Dec‐17
22‐Jan‐18
5‐Feb‐18
5‐Feb‐18
95%
95%
0%
0.251%
0.251%
4
SAFETY
3963‐DGEN‐3‐17‐0004
L
TERMS OF REFERENCE FOR HAZOP
1
A
0.069%
15‐May‐17
25‐May‐17
30‐May‐17
30‐Jun‐17
21‐Jul‐17
31‐Jul‐17
31‐Oct‐18
5‐Apr‐17
18‐Oct‐17
19‐Oct‐17
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
22‐Jul‐19
5‐Apr‐17
18‐Oct‐17
19‐Oct‐17
24‐Jan‐18
24‐Jan‐18
24‐Jan‐18
95%
95%
0%
0.066%
0.066%
0.250%
25‐Jun‐17
10‐Jul‐17
31‐Oct‐18
21‐Nov‐17
21‐Nov‐17
4
SAFETY
3963‐DGEN‐3‐17‐0005
OT
L
HAZOP REPORT
1
C
26‐Jul‐17
31‐Jul‐17
2
1067
14‐Jul‐17
26‐Jul‐17
1064
1068
0.000%
14‐Jul‐17
1065 1066
2
3963‐FAHS‐1‐51‐0003
A
5‐Jul‐17
1‐Jun‐17
31‐Aug‐17
2‐Jul‐17
21‐Sep‐17
23‐Jul‐17
4‐Dec‐17
19‐Dec‐17
19‐Dec‐17
0.132%
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
11‐Nov‐17
19‐Nov‐17
10‐Jan‐18
23‐Jan‐18
23‐Jan‐18
11‐Nov‐17
19‐Nov‐17
10‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.238%
0.238%
1080
4
SAFETY
3963‐DGEN‐3‐17‐0006
L
HAZOP CLOSE OUT REPORT
1
A
0.250%
31‐Jul‐17
10‐Aug‐17
15‐Aug‐17
4‐Sep‐17
13‐Sep‐17
16‐Sep‐17
31‐Oct‐18
19‐Oct‐17
16‐Dec‐17
17‐Dec‐17
21‐Jan‐18
12‐Mar‐18
12‐Mar‐18
22‐Jul‐19
19‐Oct‐17
16‐Dec‐17
17‐Dec‐17
21‐Jan‐18
12‐Mar‐18
12‐Mar‐18
95%
95%
0%
0.238%
0.238%
1081
4
SAFETY
3963‐DGEN‐3‐17‐0008
OT
QRA ASSUMPTION REGISTER
1
A
0.069%
5‐May‐17
15‐May‐17
20‐May‐17
20‐Jun‐17
11‐Jul‐17
21‐Jul‐17
31‐Oct‐18
25‐May‐17
8‐Aug‐17
10‐Aug‐17
25‐Oct‐17
25‐Oct‐17
22‐Jan‐18
22‐Jul‐19
25‐May‐17
8‐Aug‐17
10‐Aug‐17
25‐Oct‐17
25‐Oct‐17
22‐Jan‐18
95%
95%
0%
0.066%
0.066%
10‐May‐17
20‐May‐17
20‐Jul‐17
10‐Aug‐17
20‐Jul‐17
10‐Aug‐17
19‐Jul‐17
22‐Jul‐19
4‐Dec‐17
1082
4
SAFETY
3963‐DGEN‐3‐17‐0010
OT
FRA ASSUMPTION REGISTER
1
A
0.125%
25‐May‐17
25‐Jun‐17
16‐Jul‐17
26‐Jul‐17
31‐Oct‐18
25‐May‐17
21‐Aug‐17
22‐Aug‐17
22‐Jul‐19
25‐May‐17
21‐Aug‐17
22‐Aug‐17
1083
4
SAFETY
3963‐DGEN‐3‐17‐0011
OT
FIRE RISK ASSESSMENT STUDY
1
1
0.285%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
21‐Jun‐17
1‐Jan‐18
3‐Jan‐18
29‐Jan‐18
28‐Jul‐18
28‐Jul‐18
22‐Jul‐19
21‐Jun‐17
1‐Jan‐18
3‐Jan‐18
29‐Jan‐18
28‐Jul‐18
28‐Jul‐18
95%
95%
0%
0.270%
0.270%
1084
4
SAFETY
3963‐DGEN‐3‐17‐0012
OT
FIREWATER DEMAND AND AVAILABILITY REPORT
1
A
0.139%
20‐Apr‐17
30‐Apr‐17
5‐May‐17
5‐Jun‐17
26‐Jun‐17
6‐Jul‐17
31‐Oct‐18
5‐Apr‐17
9‐May‐17
10‐May‐17
15‐Jun‐17
15‐Jun‐17
4‐Oct‐17
22‐Jul‐19
5‐Apr‐17
9‐May‐17
19‐Jul‐17
10‐May‐17
15‐Jun‐17
15‐Jun‐17
4‐Oct‐17
95%
95%
95%
0%
0.132%
0.132%
1085
4
SAFETY
3963‐DGEN‐3‐17‐0013
OT
HSE ACTION TRACKING REGISTER
1
A
0.153%
10‐Aug‐17
20‐Aug‐17
25‐Aug‐17
12‐Sep‐17
18‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
8‐Jun‐18
10‐Jun‐18
10‐Aug‐18
9‐Sep‐18
9‐Sep‐18
22‐Jul‐19
19‐Oct‐17
8‐Jun‐18
10‐Jun‐18
10‐Aug‐18
9‐Sep‐18
9‐Sep‐18
95%
95%
0%
0.145%
0.145%
1086
4
SAFETY
3963‐DGEN‐3‐17‐0015
OT
TBE FOR FIRE FIGHINT & SAFETY EQUIPMENT
1
2
0.153%
7‐Aug‐17
17‐Aug‐17
22‐Aug‐17
9‐Sep‐17
15‐Sep‐17
18‐Sep‐17
31‐Oct‐18
95%
0%
0%
0.119%
0.145%
0.119%
0.145%
19‐Oct‐17
29‐Nov‐17
3‐Dec‐17
6‐Feb‐18
28‐Mar‐18
28‐Mar‐18
22‐Jul‐19
19‐Oct‐17
29‐Nov‐17
3‐Dec‐17
6‐Feb‐18
28‐Mar‐18
28‐Mar‐18
1087
4
SAFETY
3963‐DGEN‐3‐15‐0001
OT
MATERIAL REQUISITION FOR DELUGE SKID
1
A
0.125%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
4‐Jul‐17
24‐Jul‐17
25‐Jul‐17
10‐Aug‐17
30‐Aug‐17
9‐Jan‐18
22‐Jul‐19
4‐Jul‐17
24‐Jul‐17
25‐Jul‐17
10‐Aug‐17
30‐Aug‐17
9‐Jan‐18
95%
95%
0%
0.119%
0.119%
1088
4
SAFETY
3963‐DGEN‐3‐15‐0002
OT
MATERIAL REQUISITION FOR FIRE FIGHTING SYSTEM
1
A
0.125%
5‐Jul‐17
15‐Jul‐17
20‐Jul‐17
20‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
4‐Jul‐17
24‐Jul‐17
25‐Jul‐17
10‐Aug‐17
30‐Aug‐17
3‐Jan‐18
22‐Jul‐19
4‐Jul‐17
24‐Jul‐17
25‐Jul‐17
10‐Aug‐17
30‐Aug‐17
3‐Jan‐18
95%
95%
0%
0.119%
0.119%
1089
4
SAFETY
1
B
30‐Aug‐17
30‐Aug‐17
3963‐DGEN‐3‐14‐0001
OT
DELUGE SKIDS SPECIFICATION
0.056%
20‐Apr‐17
5‐Jun‐17
26‐Jun‐17
9‐May‐17
11‐May‐17
9‐Jul‐17
9‐May‐17
11‐May‐17
9‐Jul‐17
1090
4
SAFETY
3963‐DGEN‐3‐14‐0002
OT
FIRE FIGHTING & SAFETY EQUIPMENT SPECIFIFCATION
1
C
0.125%
20‐Apr‐17
30‐Apr‐17
5‐May‐17
5‐Jun‐17
26‐Jun‐17
6‐Jul‐17
31‐Oct‐18
19‐Apr‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
26‐Jul‐17
27‐Jul‐17
22‐Jul‐19
19‐Apr‐17
9‐May‐17
10‐May‐17
1‐Jun‐17
26‐Jul‐17
27‐Jul‐17
95%
95%
0%
0.119%
0.119%
1091
4
SAFETY
3963‐DGEN‐3‐14‐0003
OT
PASSIVE FIRE PROTECTION‐SPECIFICATION
1
A
0.125%
9‐Apr‐17
19‐Apr‐17
24‐Apr‐17
25‐May‐17
15‐Jun‐17
25‐Jun‐17
31‐Oct‐18
19‐Apr‐17
24‐Apr‐17
26‐Apr‐17
6‐Jul‐17
12‐Jul‐17
17‐Jul‐17
22‐Jul‐19
19‐Apr‐17
24‐Apr‐17
26‐Apr‐17
6‐Jul‐17
12‐Jul‐17
17‐Jul‐17
95%
95%
0%
0.119%
0.119%
OT
DELUGE SYSTEM CALCULATION
1
B
0.125%
25‐Apr‐17
5‐May‐17
10‐May‐17
10‐Jun‐17
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
6‐Jun‐17
6‐Jun‐17
12‐Dec‐17
23‐Jan‐18
1092
5‐May‐17
3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHM)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
95%
95%
0%
0.066%
0.066%
3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHN)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
95%
95%
0%
0.066%
0.066%
3963‐FAHS‐3‐58‐0001
OT
3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (FAHS)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
4
SAFETY
3963‐JALM‐3‐58‐0001
OT
3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (JALM)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
95%
95%
0%
0.066%
0.066%
4
SAFETY
3963‐KAHM‐3‐58‐0001
OT
3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHM)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
95%
95%
0%
0.066%
0.066%
SAFETY
3963‐KAHN‐3‐58‐0001
OT
3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHN)
1
A
0.069%
24‐May‐17
30‐Jul‐17
9‐Aug‐17
25‐May‐17
25‐May‐17
31‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
95%
95%
95%
95%
0%
0%
0.066%
0.119%
1096
4
22‐Jul‐19
0.119%
1097 1098
25‐Jan‐18
0%
0.053%
OT
25‐Jan‐18
95%
0.053%
OT
14‐Dec‐17
95%
0%
3963‐FAHN‐3‐58‐0001
1‐Jun‐17
23‐Jan‐18
95%
3963‐DGEN‐3‐12‐0001
31‐May‐17
5‐Apr‐17
95%
3963‐FAHM‐3‐58‐0001
25‐May‐17
12‐Dec‐17
3‐Jan‐18
SAFETY
31‐Oct‐18
6‐Jun‐17
5‐Apr‐17
SAFETY
9‐Aug‐17
6‐Jun‐17
22‐Jul‐19
SAFETY
30‐Jul‐17
5‐Apr‐17
3‐Jan‐18
4
9‐Jul‐17
31‐Oct‐18
5‐Apr‐17
4
SAFETY
11‐Jul‐17
31‐Oct‐18
1093
4
1‐Jul‐17
6‐Jul‐17
1094 1095
4
30‐Apr‐17
95%
95%
0.066%
0.066%
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
22‐Jul‐19
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
1099
4
SAFETY
3963‐KAHS‐3‐58‐0001
OT
3 PHASE TEST SEPARATORS SAFETY & FIRE FIGHTING EQUIPMENT LAYOUT (KAHS)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
14‐Dec‐17
25‐Jan‐18
25‐Jan‐18
95%
95%
0%
0.066%
0.066%
1100
4
SAFETY
3963‐FAHM‐3‐60‐0001
OT
PASSIVE FIRE PROTECTION LAYOUT (FAHM)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.066%
0.066%
0.066%
1101
4
SAFETY
3963‐FAHN‐3‐60‐0001
OT
PASSIVE FIRE PROTECTION LAYOUT (FAHN)
1
2
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
8‐Jul‐18
8‐Jul‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
8‐Jul‐18
8‐Jul‐18
95%
95%
0%
0.066%
0.066%
1102
4
SAFETY
3963‐FAHS‐3‐60‐0001
OT
PASSIVE FIRE PROTECTION LAYOUT (FAHS)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
21‐Jul‐18
21‐Jul‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
21‐Jul‐18
21‐Jul‐18
95%
95%
0%
0.066%
0.066%
1103
4
SAFETY
3963‐JALM‐3‐60‐0001
OT
PASSIVE FIRE PROTECTION LAYOUT (JALM)
1
2
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
11‐Jul‐18
11‐Jul‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
11‐Jul‐18
11‐Jul‐18
95%
95%
0%
0.066%
1104
4
SAFETY
3963‐KAHM‐3‐60‐0001
OT
PASSIVE FIRE PROTECTION LAYOUT (KAHM)
1
2
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
11‐Jul‐18
11‐Jul‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
11‐Jul‐18
11‐Jul‐18
95%
95%
0%
0.066%
0.066%
1105
4
SAFETY
3963‐KAHN‐3‐60‐0001
OT
PASSIVE FIRE PROTECTION LAYOUT (KAHN)
1
2
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
26‐Aug‐18
26‐Aug‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
26‐Aug‐18
26‐Aug‐18
95%
95%
0%
0.066%
0.066%
1106
4
SAFETY
3963‐KAHS‐3‐60‐0001
OT
PASSIVE FIRE PROTECTION LAYOUT (KAHS)
1
2
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
11‐Jul‐18
11‐Jul‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
7‐Jan‐18
11‐Jul‐18
11‐Jul‐18
95%
95%
0%
0.066%
0.066%
1107
4
SAFETY
3963‐FAHM‐3‐54‐0001
OT
SAFETY SIGN LAYOUTS (FAHM)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
1108
4
SAFETY
3963‐FAHN‐3‐54‐0001
OT
SAFETY SIGN LAYOUTS (FAHN)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
16‐Dec‐17
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
16‐Dec‐17
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.066%
0.066%
1109
4
SAFETY
3963‐FAHS‐3‐54‐0001
OT
SAFETY SIGN LAYOUTS (FAHS)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
16‐Dec‐17
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
16‐Dec‐17
23‐Jan‐18
23‐Jan‐18
95%
95%
0%
0.066%
0.066%
1110
4
SAFETY
3963‐JALM‐3‐54‐0001
OT
SAFETY SIGN LAYOUTS (JALM)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
17‐Aug‐17
17‐Aug‐17
23‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
17‐Aug‐17
17‐Aug‐17
23‐Jan‐18
95%
95%
0%
0.066%
0.066%
1111
4
SAFETY
3963‐KAHM‐3‐54‐0001
1112
4
SAFETY
3963‐KAHN‐3‐54‐0001
OT
SAFETY SIGN LAYOUTS (KAHN)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
17‐Aug‐17
17‐Aug‐17
23‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
17‐Aug‐17
17‐Aug‐17
23‐Jan‐18
95%
95%
0%
0.066%
0.066%
1113
4
SAFETY
3963‐KAHS‐3‐54‐0001
OT
SAFETY SIGN LAYOUTS (KAHS)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
31‐May‐17
1‐Jun‐17
17‐Aug‐17
17‐Aug‐17
23‐Jan‐18
22‐Jul‐19
25‐May‐17
31‐May‐17
1‐Jun‐17
17‐Aug‐17
17‐Aug‐17
23‐Jan‐18
95%
95%
0%
0.066%
0.066%
1114
4
SAFETY
3963‐FAHM‐3‐59‐0001
OT
FIREWATER RING MAIN, P&ID (FAHM)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
11‐May‐17
11‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
22‐Jul‐19
11‐May‐17
11‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
95%
95%
0%
0.079%
0.079%
1115
4
SAFETY
3963‐FAHM‐3‐59‐0002
OT
FIREWATER DELUGE SYSTEM, P&ID (FAHM)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
9‐Jan‐18
22‐Jul‐19
3‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
9‐Jan‐18
95%
95%
0%
0.079%
0.079%
OT
SAFETY SIGN LAYOUTS (KAHM)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
Page 9 of 13
25‐May‐17
25‐May‐17
31‐May‐17
31‐May‐17
1‐Jun‐17
1‐Jun‐17
16‐Dec‐17
17‐Aug‐17
23‐Jan‐18
17‐Aug‐17
23‐Jan‐18
23‐Jan‐18
22‐Jul‐19
22‐Jul‐19
25‐May‐17
25‐May‐17
31‐May‐17
31‐May‐17
1‐Jun‐17
1‐Jun‐17
16‐Dec‐17
17‐Aug‐17
23‐Jan‐18
17‐Aug‐17
23‐Jan‐18
23‐Jan‐18
95%
95%
95%
95%
0%
0%
0.066%
0.066%
0.066%
Page 80 of 170
0.066%
0.066%
REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS-DUKHAN FIELD
Engineering Document & Deliverables Register (EDDR)
REV D
100.000% SRN
DISCSE DISCIPLINE Q
DOC NO
ITEM CODE
DOC DESC
DOC CLASS
CURRENT REVISION
START
DRAFT/IDC
IFC
5%
0%
40%
Rev-D
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
25-Oct-18
IFA
IAWH
IAFC
AS-BUILT
START
DRAFT/IDC
IFC
65%
85%
95%
100%
5%
0%
40%
PLANNED
IFA
IAWH
IAFC
AS-BUILT
65%
85%
95%
100% ACTASBUIL T
ACTUAL
Deliverable Milestone Plan
Actual
Weight Factor % Variance
SRN
SEQ
WV
PLS
PLD
PLIFC
PLIFA
PLASBUILT
PLS
PLD
PLIFC
PLIFA
PLIAWH
PLIAFC
PLASBUILT
ACTS
ACTD
ACTIFC
ACTIFA
ACTIAWH
ACTIAFC
1116
4
SAFETY
3963‐FAHN‐3‐59‐0001
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
22‐Jul‐19
4‐May‐17
9‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
0.079%
0.079%
1117
4
SAFETY
3963‐FAHN‐3‐59‐0002
OT
FIREWATER DELUGE SYSTEM, P&ID (FAHN)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
22‐Jul‐19
3‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
95%
95%
0%
0.079%
0.079%
1118
4
SAFETY
3963‐FAHS‐3‐59‐0001
OT
FIREWATER RING MAIN, P&ID (FAHS)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
11‐May‐17
11‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
22‐Jul‐19
11‐May‐17
11‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
95%
95%
0%
0.079%
0.079%
1119
4
SAFETY
3963‐FAHS‐3‐59‐0002
OT
FIREWATER DELUGE SYSTEM, P&ID (FAHS)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
22‐Jul‐19
4‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
95%
95%
0%
0.079%
0.079%
1120
4
SAFETY
3963‐JALM‐3‐59‐0001
OT
FIREWATER RING MAIN, P&ID (JALM)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
11‐May‐17
11‐May‐17
11‐May‐17
17‐Aug‐17
17‐Aug‐17
11‐Jan‐18
22‐Jul‐19
11‐May‐17
11‐May‐17
11‐May‐17
17‐Aug‐17
17‐Aug‐17
11‐Jan‐18
95%
95%
0%
0.079%
0.079%
1121
4
SAFETY
3963‐JALM‐3‐59‐0002
OT
FIREWATER DELUGE SYSTEM, P&ID (JALM)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
22‐Jul‐19
4‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
95%
95%
0%
0.079%
0.079%
1122
4
SAFETY
3963‐KAHM‐3‐59‐0001
OT
FIREWATER RING MAIN, P&ID (KAHM)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
22‐Jul‐19
4‐May‐17
9‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
95%
95%
0%
0.079%
0.079%
1123
4
SAFETY
3963‐KAHM‐3‐59‐0002
OT
FIREWATER DELUGE SYSTEM, P&ID (KAHM)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
11‐May‐17
11‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
22‐Jul‐19
11‐May‐17
11‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
95%
95%
0%
0.079%
0.079%
1124
4
SAFETY
3963‐KAHN‐3‐59‐0001
OT
FIREWATER RING MAIN, P&ID (KAHN)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
9‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
22‐Jul‐19
3‐May‐17
9‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
95%
95%
0%
0.079%
0.079%
1125
4
SAFETY
3963‐KAHN‐3‐59‐0002
OT
FIREWATER DELUGE SYSTEM, P&ID (KAHN)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
11‐Jan‐18
22‐Jul‐19
4‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
11‐Jan‐18
95%
95%
0%
0.079%
0.079%
1126
4
SAFETY
3963‐KAHS‐3‐59‐0001
OT
FIREWATER RING MAIN, P&ID (KAHS)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
11‐May‐17
11‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
22‐Jul‐19
11‐May‐17
11‐May‐17
11‐May‐17
30‐Aug‐17
20‐Sep‐17
11‐Jan‐18
95%
95%
0%
0.079%
0.079%
1127
4
SAFETY
3963‐KAHS‐3‐59‐0002
OT
FIREWATER DELUGE SYSTEM, P&ID (KAHS)
1
A
0.083%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
4‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
22‐Jul‐19
4‐May‐17
9‐May‐17
11‐May‐17
27‐Aug‐17
20‐Sep‐17
10‐Jan‐18
95%
95%
0%
0.079%
1128
4
SAFETY
3963‐FAHM‐3‐13‐0001
OT
DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHM)
1
A
0.069%
7‐May‐17
17‐May‐17
22‐May‐17
22‐Jun‐17
13‐Jul‐17
23‐Jul‐17
31‐Oct‐18
10‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
22‐Jul‐19
10‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
95%
95%
0%
0.066%
0.066%
1129
4
SAFETY
3963‐FAHN‐3‐13‐0001
OT
DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHN)
1
A
0.069%
7‐May‐17
17‐May‐17
22‐May‐17
22‐Jun‐17
13‐Jul‐17
23‐Jul‐17
31‐Oct‐18
10‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
22‐Jul‐19
10‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
95%
95%
0%
0.066%
0.066%
1130
4
SAFETY
3963‐FAHS‐3‐13‐0001
OT
DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(FAHS)
1
A
0.069%
7‐May‐17
17‐May‐17
22‐May‐17
22‐Jun‐17
13‐Jul‐17
23‐Jul‐17
31‐Oct‐18
10‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
22‐Jul‐19
10‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
95%
95%
0%
0.066%
0.066%
1131
PLIAWH
PLIAFC
SAFETY
3963‐JALM‐3‐13‐0001
DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(JALM)
1
A
0.069%
7‐May‐17
17‐May‐17
22‐May‐17
22‐Jun‐17
13‐Jul‐17
29‐Jun‐17
11‐Jan‐18
95%
95%
0%
0.066%
0.066%
SAFETY
3963‐KAHM‐3‐13‐0001
OT
DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHM)
1
A
0.069%
7‐May‐17
17‐May‐17
22‐May‐17
22‐Jun‐17
13‐Jul‐17
23‐Jul‐17
31‐Oct‐18
21‐May‐17
22‐May‐17
24‐May‐17
18‐Jul‐17
26‐Jul‐17
11‐Jan‐18
22‐Jul‐19
21‐May‐17
22‐May‐17
24‐May‐17
18‐Jul‐17
26‐Jul‐17
11‐Jan‐18
95%
95%
0%
0.066%
0.066%
SAFETY
3963‐KAHN‐3‐13‐0001
OT
DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHN)
1
A
0.069%
7‐May‐17
17‐May‐17
22‐May‐17
22‐Jun‐17
13‐Jul‐17
23‐Jul‐17
31‐Oct‐18
10‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
22‐Jul‐19
10‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
95%
95%
0%
0.066%
0.066%
7‐May‐17
17‐May‐17
22‐Jun‐17
13‐Jul‐17
23‐Jul‐17
31‐Oct‐18
10‐May‐17
31‐May‐17
1‐Jun‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
22‐Jul‐19
10‐May‐17
31‐May‐17
1‐Jun‐17
21‐Jun‐17
29‐Jun‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
29‐Jun‐17
11‐Jan‐18
22‐Jul‐19
21‐May‐17
22‐May‐17
24‐May‐17
21‐Jun‐17
SAFETY
3963‐KAHS‐3‐13‐0001
DATA SHEET FOR FIRE FIGHTING & SAFETY EQUIPMENT(KAHS)
1
A
11‐Jan‐18
95%
95%
0%
0.066%
0.066%
1135
4
SAFETY
3963‐FAHM‐3‐13‐0002
OT
DATA SHEET FOR DELUGE SKIDS (FAHM)
1
B
0.069%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
7‐Aug‐17
24‐Jan‐18
22‐Jul‐19
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
7‐Aug‐17
24‐Jan‐18
95%
95%
0%
0.066%
0.066%
1136
4
SAFETY
3963‐FAHN‐3‐13‐0002
OT
DATA SHEET FOR DELUGE SKIDS (FAHN)
1
B
0.069%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
7‐Aug‐17
24‐Jan‐18
22‐Jul‐19
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
7‐Aug‐17
24‐Jan‐18
95%
95%
0%
0.066%
0.066%
1137
4
SAFETY
3963‐FAHS‐3‐13‐0002
OT
DATA SHEET FOR DELUGE SKIDS (FAHS)
1
B
0.069%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
7‐Aug‐17
24‐Jan‐18
22‐Jul‐19
3‐May‐17
11‐May‐17
11‐May‐17
24‐Jan‐18
95%
95%
0%
0.066%
0.066%
1138
4
SAFETY
3963‐JALM‐3‐13‐0002
OT
DATA SHEET FOR DELUGE SKIDS (JALM)
1
B
0.069%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
7‐Aug‐17
24‐Jan‐18
22‐Jul‐19
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
7‐Aug‐17
24‐Jan‐18
95%
95%
0%
0.066%
0.066%
1139
4
SAFETY
3963‐KAHM‐3‐13‐0002
OT
DATA SHEET FOR DELUGE SKIDS (KAHM)
1
B
0.056%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
10‐Aug‐17
24‐Jan‐18
22‐Jul‐19
3‐May‐17
11‐May‐17
11‐May‐17
19‐Jul‐17
10‐Aug‐17
24‐Jan‐18
95%
95%
0%
0.053%
0.053%
1140
4
SAFETY
3963‐KAHN‐3‐13‐0002
OT
DATA SHEET FOR DELUGE SKIDS (KAHN)
1
B
0.056%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
11‐May‐17
11‐May‐17
20‐Jul‐17
10‐Aug‐17
24‐Jan‐18
22‐Jul‐19
3‐May‐17
11‐May‐17
11‐May‐17
20‐Jul‐17
10‐Aug‐17
24‐Jan‐18
95%
95%
0%
0.053%
1141
4
SAFETY
3963‐KAHS‐3‐13‐0002
OT
DATA SHEET FOR DELUGE SKIDS (KAHS)
1
B
0.056%
26‐Apr‐17
6‐May‐17
11‐May‐17
11‐Jun‐17
2‐Jul‐17
12‐Jul‐17
31‐Oct‐18
3‐May‐17
11‐May‐17
11‐May‐17
20‐Jul‐17
10‐Aug‐17
24‐Jan‐18
22‐Jul‐19
3‐May‐17
11‐May‐17
11‐May‐17
20‐Jul‐17
10‐Aug‐17
24‐Jan‐18
95%
95%
0%
0.053%
0.053%
1142
4
SAFETY
3963‐JALM‐3‐56‐0001
OT
CAUSE & EFFECT CHART (F&G) (JALM)
1
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
22‐Jul‐19
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
95%
95%
0%
0.066%
0.066%
1143
1
A
0.056%
24‐May‐17
SAFETY
3963‐KAHS‐3‐56‐0001
25‐May‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
22‐Jul‐19
25‐May‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
4
SAFETY
3963‐FAHM‐3‐56‐0001
OT
CAUSE & EFFECT CHART (F&G) (FAHM)
1
A
0.056%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
22‐Jul‐19
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
95%
95%
0%
0.053%
0.053%
SAFETY
3963‐FAHN‐3‐56‐0001
OT
CAUSE & EFFECT CHART (F&G) (FAHN)
1
A
0.056%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
25‐Sep‐17
25‐Jan‐18
22‐Jul‐19
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
25‐Sep‐17
25‐Jan‐18
95%
95%
0%
0.053%
0.053%
CAUSE & EFFECT CHART (F&G) (FAHS)
1
A
0.056%
24‐May‐17
3‐Jun‐17
3‐Jun‐17
8‐Jun‐17
8‐Jun‐17
9‐Jul‐17
9‐Jul‐17
30‐Jul‐17
30‐Jul‐17
9‐Aug‐17
9‐Aug‐17
31‐Oct‐18
8‐Jun‐17
8‐Jun‐17
95%
95%
0%
0.053%
0.053%
4
OT
CAUSE & EFFECT CHART (F&G) (KAHS)
7‐Aug‐17
1144
4
OT
19‐Jul‐17
1145 1146
4
22‐May‐17
21‐May‐17
0.079%
4
0.069%
31‐Oct‐18
Actual WF
4
OT
23‐Jul‐17
Plan WF
1132
4
OT
DOC DESC
Planned Actual Actual Deliverable MS Deliverable MS Deliverable MS 95% 95% 0%
1133 1134
4
DOC NO
CURRENT REVISION A
Original BL WV
ITEM CODE OT FIREWATER RING MAIN, P&ID (FAHN)
DISCIPLINE
DOC CLASS 1
SHUTD OWN PACKA GE SHUTD OWN
0.053%
SAFETY
3963‐FAHS‐3‐56‐0001
31‐Oct‐18
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
22‐Jul‐19
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
95%
95%
0%
0.053%
0.053%
1147
4
SAFETY
3963‐KAHM‐3‐56‐0001
OT
CAUSE & EFFECT CHART (F&G) (KAHM)
1
A
0.056%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
22‐Jul‐19
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
95%
95%
0%
0.053%
0.053%
1148
4
SAFETY
3963‐KAHN‐3‐56‐0001
OT
CAUSE & EFFECT CHART (F&G) (KAHN)
1
A
0.056%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
22‐Jul‐19
25‐May‐17
8‐Jun‐17
8‐Jun‐17
17‐Jul‐17
30‐Aug‐17
25‐Jan‐18
95%
95%
0%
0.053%
0.053%
1149
4
SAFETY
DEM‐3963‐FAHM‐3‐55‐0002
DEM
DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (FAHM)
1
A
0.167%
8‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
15‐Sep‐17
25‐Sep‐17
31‐Oct‐18
11‐Jul‐17
11‐Jul‐17
11‐Jul‐17
25‐Jul‐17
25‐Jul‐17
23‐Aug‐17
22‐Jul‐19
11‐Jul‐17
11‐Jul‐17
11‐Jul‐17
25‐Jul‐17
25‐Jul‐17
23‐Aug‐17
95%
95%
0%
0.158%
0.158%
1150
4
SAFETY
DEM‐3963‐FAHN‐3‐55‐0002
DEM
DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (FAHN)
1
A
0.167%
8‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
15‐Sep‐17
25‐Sep‐17
31‐Oct‐18
11‐Jul‐17
11‐Jul‐17
11‐Jul‐17
25‐Jul‐17
25‐Jul‐17
23‐Aug‐17
22‐Jul‐19
11‐Jul‐17
11‐Jul‐17
11‐Jul‐17
25‐Jul‐17
25‐Jul‐17
23‐Aug‐17
95%
95%
0%
0.158%
0.158%
31‐Oct‐18
11‐Jul‐17
11‐Jul‐17
22‐Jul‐19
11‐Jul‐17
11‐Jul‐17
SAFETY
DEM‐3963‐KAHM‐3‐55‐0002
1152
4
SAFETY
DEM‐3963‐KAHN‐3‐55‐0002
DEM
DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (KAHN)
1
A
0.167%
8‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Aug‐17
15‐Sep‐17
25‐Sep‐17
31‐Oct‐18
8‐Jul‐17
8‐Jul‐17
11‐Jul‐17
25‐Jul‐17
25‐Jul‐17
23‐Aug‐17
22‐Jul‐19
8‐Jul‐17
8‐Jul‐17
11‐Jul‐17
25‐Jul‐17
25‐Jul‐17
23‐Aug‐17
95%
95%
0%
0.158%
0.158%
1153
1151
4
4
SAFETY
DEM‐3963‐JALM‐3‐55‐0002
DEM
DEM
DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (JALM)
DEMOLITION ‐ CAUSE & EFFECT CHART (PROCESS) (KAHM)
1
1
A
A
0.167%
0.167%
8‐Jul‐17
8‐Jul‐17
20‐Jul‐17
20‐Jul‐17
25‐Jul‐17
25‐Jul‐17
25‐Aug‐17
25‐Aug‐17
15‐Sep‐17
15‐Sep‐17
25‐Sep‐17
25‐Sep‐17
31‐Oct‐18
8‐Jul‐17
8‐Jul‐17
11‐Jul‐17
25‐Jul‐17
25‐Jul‐17
23‐Aug‐17
22‐Jul‐19
8‐Jul‐17
8‐Jul‐17
11‐Jul‐17
25‐Jul‐17
25‐Jul‐17
23‐Aug‐17
95%
95%
0%
0.158%
0.158%
21‐Sep‐17
4‐Dec‐17
4‐Dec‐17
23‐Aug‐17
5‐Sep‐17
14‐Sep‐17
11‐Jul‐17
21‐Sep‐17
25‐Jul‐17
4‐Dec‐17
25‐Jul‐17
4‐Dec‐17
23‐Aug‐17
4‐Dec‐17
95%
95%
95%
95%
0%
0%
0.158%
0.013%
0.158%
4
SAFETY
3963‐DGEN‐3‐62‐0001
OT
F&G SCHEMATIC DIAGRAM (TYPICAL)
1
B
0.014%
5‐Sep‐17
21‐Sep‐17
28‐Sep‐17
10‐Oct‐17
20‐Oct‐17
4‐Nov‐17
4‐Dec‐17
22‐Jul‐19
5
SAFETY
3963‐DGEN‐3‐00‐0001
OT
MISCELLANEOUS ‐ SAFETY
0
#N/A
0.056%
31‐Aug‐17
6‐Sep‐17
7‐Sep‐17
14‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
1‐Feb‐18
6‐Feb‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
22‐Jul‐19
1‐Feb‐18
6‐Feb‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
8‐Mar‐18
95%
95%
0%
0.053%
0.053%
1156
4
SAFETY
3963‐FAHM‐3‐50‐0001
OT
ESCAPE ROUTE LAYOUT (FAHM)
3
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
25‐May‐17
25‐May‐17
28‐Dec‐17
31‐Jan‐18
31‐Jan‐18
22‐Jul‐19
25‐May‐17
25‐May‐17
25‐May‐17
28‐Dec‐17
31‐Jan‐18
31‐Jan‐18
95%
95%
0%
0.066%
0.066%
1157
4
SAFETY
3963‐FAHN‐3‐50‐0001
OT
ESCAPE ROUTE LAYOUT (FAHN)
3
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
28‐Dec‐17
31‐Jan‐18
31‐Jan‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
28‐Dec‐17
31‐Jan‐18
31‐Jan‐18
95%
95%
0%
0.066%
0.066%
0.013%
3963‐FAHS‐3‐50‐0001
OT
ESCAPE ROUTE LAYOUT (FAHS)
3
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
28‐Dec‐17
20‐Mar‐18
20‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
28‐Dec‐17
20‐Mar‐18
20‐Mar‐18
95%
95%
0%
0.066%
0.066%
1159
4
SAFETY
3963‐JALM‐3‐50‐0001
OT
ESCAPE ROUTE LAYOUT (JALM)
3
A
0.083%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
25‐May‐17
25‐May‐17
28‐Dec‐17
14‐Mar‐18
14‐Mar‐18
22‐Jul‐19
25‐May‐17
25‐May‐17
25‐May‐17
28‐Dec‐17
14‐Mar‐18
14‐Mar‐18
95%
95%
0%
0.079%
0.079%
1160
4
SAFETY
3963‐KAHM‐3‐50‐0001
OT
ESCAPE ROUTE LAYOUT (KAHM)
3
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
28‐Dec‐17
14‐Mar‐18
14‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
28‐Dec‐17
14‐Mar‐18
14‐Mar‐18
95%
95%
0%
0.066%
0.066%
SAFETY
3963‐KAHN‐3‐50‐0001
1161
4
SAFETY
14‐Sep‐17
25‐Jul‐17
1154
4
5‐Sep‐17
25‐Jul‐17
1155
1158
31‐Oct‐18
11‐Jul‐17
3
A
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
28‐Dec‐17
14‐Mar‐18
14‐Mar‐18
25‐May‐17
27‐May‐17
28‐May‐17
28‐Dec‐17
14‐Mar‐18
14‐Mar‐18
95%
95%
0%
0.066%
0.066%
1162
4
SAFETY
3963‐KAHS‐3‐50‐0001
OT
ESCAPE ROUTE LAYOUT (KAHS)
3
A
0.069%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
2‐Jan‐18
14‐Mar‐18
14‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
2‐Jan‐18
14‐Mar‐18
14‐Mar‐18
95%
95%
0%
0.066%
0.066%
1163
4
SAFETY
3963‐JALM‐3‐55‐0001
OT
OT
CAUSE & EFFECT CHART (PROCESS) (JALM)
ESCAPE ROUTE LAYOUT (KAHN)
1
3
0.056%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
15‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
22‐Jul‐19
15‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
95%
95%
0%
0.053%
0.053%
1164
4
SAFETY
3963‐KAHS‐3‐55‐0001
OT
CAUSE & EFFECT CHART (PROCESS) (KAHS)
1
3
0.056%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
22‐Jul‐19
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
95%
95%
0%
0.053%
0.053%
1165
4
SAFETY
3963‐FAHM‐3‐55‐0001
OT
CAUSE & EFFECT CHART (PROCESS) (FAHM)
1
3
0.056%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
22‐Jul‐19
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
95%
95%
0%
0.053%
0.053%
1166
4
SAFETY
3963‐FAHN‐3‐55‐0001
OT
CAUSE & EFFECT CHART (PROCESS) (FAHN)
1
3
0.056%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
22‐Jul‐19
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
95%
95%
0%
0.053%
0.053%
1167
4
SAFETY
3963‐FAHS‐3‐55‐0001
OT
CAUSE & EFFECT CHART (PROCESS) (FAHS)
1
3
0.056%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
22‐Jul‐19
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
95%
95%
0%
0.053%
0.053%
1168
4
SAFETY
3963‐KAHM‐3‐55‐0001
OT
CAUSE & EFFECT CHART (PROCESS) (KAHM)
1
3
0.056%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
22‐Jul‐19
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
5‐May‐18
95%
95%
0%
0.053%
0.053%
1169
4
SAFETY
3963‐KAHN‐3‐55‐0001
OT
CAUSE & EFFECT CHART (PROCESS) (KAHN)
1
3
0.056%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
8‐Apr‐18
22‐Jul‐19
25‐May‐17
10‐Jul‐17
11‐Jul‐17
10‐Aug‐17
30‐Aug‐17
8‐Apr‐18
95%
95%
0%
0.053%
1170
4
SAFETY
3963‐KAHM‐3‐51‐0002
OT
KHATIYAH MAIN UNIT 24 HAZARDOUS AREA CLASSIFICATION LAYOUT
1
A
0.083%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
31‐Oct‐17
22‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
31‐Oct‐17
22‐Mar‐18
95%
95%
0%
0.079%
0.079%
1171
4
SAFETY
3963‐KAHN‐3‐51‐0002
OT
KHATIYAH NORTH UNIT 22 HAZARDOUS AREA CLASSIFICATION LAYOUT
1
A
0.083%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
31‐Oct‐17
22‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
31‐Oct‐17
22‐Mar‐18
95%
95%
0%
0.079%
0.079%
4
SAFETY
3963‐KAHS‐3‐51‐0002
OT
KHATIYAH SOUTH UNIT 23 HAZARDOUS AREA CLASSIFICATION LAYOUT
22‐Oct‐17
31‐Oct‐17
4
SAFETY
3963‐FAHS‐3‐51‐0002
OT
FAHAHIL SOUTH UNIT 13 HAZARDOUS AREA CLASSIFICATION LAYOUT
1
2
0.083%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
31‐Oct‐17
22‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
31‐Oct‐17
22‐Mar‐18
95%
95%
0%
0.079%
0.079%
4
SAFETY
3963‐JALM‐3‐51‐0002
OT
JALEHA MAIN UNIT 31 HAZARDOUS AREA CLASSIFICATION LAYOUT
1
A
0.069%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
31‐Oct‐17
22‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
31‐Oct‐17
22‐Mar‐18
95%
95%
0%
0.066%
0.066%
1175
4
SAFETY
3963‐DGEN‐3‐17‐0009
OT
QRA STUDY
1
0
0.229%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
21‐Jun‐17
21‐Jan‐18
28‐Jan‐18
27‐May‐18
28‐Jul‐18
28‐Jul‐18
22‐Jul‐19
21‐Jun‐17
21‐Jan‐18
28‐Jan‐18
27‐May‐18
28‐Jul‐18
28‐Jul‐18
95%
95%
0%
0.218%
0.218%
1176
4
SAFETY
1
1
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
3‐Nov‐17
19‐Nov‐17
21‐Nov‐17
21‐Jan‐18
20‐Mar‐18
20‐Mar‐18
22‐Jul‐19
3‐Nov‐17
19‐Nov‐17
21‐Nov‐17
21‐Jan‐18
20‐Mar‐18
20‐Mar‐18
95%
95%
0%
0.079%
0.079%
1177
4
SAFETY
3963‐DGEN‐3‐17‐0014
OT
TBE FOR DELUGE SKIDS
1
A
0.472%
7‐Aug‐17
17‐Aug‐17
22‐Aug‐17
9‐Sep‐17
15‐Sep‐17
18‐Sep‐17
31‐Oct‐18
19‐Oct‐17
18‐Dec‐17
21‐Dec‐17
18‐Jan‐18
6‐Feb‐18
6‐Feb‐18
22‐Jul‐19
19‐Oct‐17
18‐Dec‐17
21‐Dec‐17
18‐Jan‐18
6‐Feb‐18
6‐Feb‐18
95%
95%
0%
0.449%
1178
4
SAFETY
3963‐FAHM‐3‐51‐0001
OT
FAHAHIL MAIN UNIT 14 HAZARDOUS AREA CLASSIFICATION LAYOUT
1
1
0.069%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
20‐Oct‐17
22‐Oct‐17
21‐Jan‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
25‐May‐17
20‐Oct‐17
22‐Oct‐17
21‐Jan‐18
22‐Mar‐18
22‐Mar‐18
95%
95%
0%
0.066%
0.066%
1179
4
SAFETY
3963‐FAHN‐3‐51‐0002
OT
FAHAHIL NORTH UNIT 12 HAZARDOUS AREA CLASSIFICATION LAYOUT
1
A
0.083%
20‐May‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
21‐Jan‐18
22‐Mar‐18
22‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
21‐Jan‐18
22‐Mar‐18
22‐Mar‐18
95%
95%
0%
0.079%
0.079%
1180
5
INSTRUMENTA
3963‐DGEN‐4‐45‐0001
OT
SCOPE OF WORK FOR DIC SYSTEM MODIFICATION AT DUKHAN
1
A
0.111%
7‐Jun‐17
17‐Jun‐17
22‐Jun‐17
23‐Jul‐17
13‐Aug‐17
23‐Aug‐17
31‐Oct‐18
8‐Jun‐17
2‐Aug‐17
3‐Aug‐17
12‐Sep‐17
25‐Sep‐17
25‐Sep‐17
22‐Jul‐19
8‐Jun‐17
2‐Aug‐17
3‐Aug‐17
12‐Sep‐17
25‐Sep‐17
25‐Sep‐17
95%
95%
0%
0.106%
0.106%
1181
5
OT
11‐Jul‐17
0.083%
20‐May‐17
25‐Jun‐17
30‐May‐17
4‐Jun‐17
5‐Jul‐17
26‐Jul‐17
5‐Aug‐17
31‐Oct‐18
31‐Oct‐18
25‐May‐17
27‐May‐17
28‐May‐17
2‐Aug‐17
3‐Aug‐17
22‐Mar‐18
22‐Jul‐19
25‐May‐17
27‐May‐17
28‐May‐17
22‐Oct‐17
2‐Aug‐17
31‐Oct‐17
3‐Aug‐17
22‐Mar‐18
95%
95%
0%
0.079%
0.053%
1172
HAZID/ENVID REPORT
0.083%
22‐Jul‐19
1174
L
A
24‐May‐17
1173
3963‐DGEN‐3‐17‐0002
1
0.069%
0.079%
0.449%
INSTRUMENTA
3963‐DGEN‐4‐15‐0001
MATERIAL REQUISITION FOR ELECTRONIC INSTRUMENTS (PT/TT)
1
B
0.069%
26‐Jun‐17
6‐Jul‐17
11‐Aug‐17
1‐Sep‐17
11‐Sep‐17
31‐Oct‐18
29‐Jun‐17
18‐Jul‐17
19‐Jul‐17
20‐Sep‐17
22‐Jul‐19
29‐Jun‐17
18‐Jul‐17
19‐Jul‐17
20‐Sep‐17
95%
95%
0%
0.066%
0.066%
1182
5
INSTRUMENTA
3963‐DGEN‐4‐15‐0002
OT
MATERIAL REQUISITION FOR LEVEL GAUGES (MAGNETIC)
1
B
0.069%
20‐Jun‐17
30‐Jun‐17
5‐Jul‐17
5‐Aug‐17
26‐Aug‐17
5‐Sep‐17
31‐Oct‐18
22‐Jun‐17
19‐Jul‐17
20‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
22‐Jul‐19
22‐Jun‐17
19‐Jul‐17
20‐Jul‐17
2‐Aug‐17
3‐Aug‐17
28‐Sep‐17
95%
95%
0%
0.066%
0.066%
1183
5
INSTRUMENTA
3963‐DGEN‐4‐15‐0003
OT
MATERIAL REQUISITION FOR RESTRICTION ORIFICE
1
B
0.069%
28‐Jun‐17
8‐Jul‐17
13‐Jul‐17
13‐Aug‐17
3‐Sep‐17
13‐Sep‐17
31‐Oct‐18
29‐Jun‐17
26‐Jul‐17
27‐Jul‐17
10‐Aug‐17
21‐Aug‐17
22‐Aug‐17
22‐Jul‐19
29‐Jun‐17
26‐Jul‐17
27‐Jul‐17
10‐Aug‐17
21‐Aug‐17
22‐Aug‐17
95%
95%
0%
0.066%
0.066%
1184
5
INSTRUMENTA
3963‐DGEN‐4‐15‐0004
OT
MATERIAL REQUISITION FOR SHUTDOWN & BLOWDOWN VALVES
1
B
0.069%
29‐May‐17
8‐Jun‐17
13‐Jun‐17
14‐Jul‐17
4‐Aug‐17
14‐Aug‐17
31‐Oct‐18
31‐May‐17
18‐Jun‐17
19‐Jun‐17
18‐Aug‐17
28‐Sep‐17
28‐Sep‐17
22‐Jul‐19
31‐May‐17
18‐Jun‐17
19‐Jun‐17
18‐Aug‐17
28‐Sep‐17
28‐Sep‐17
95%
95%
0%
0.066%
0.066%
1185
5
INSTRUMENTA
3963‐DGEN‐4‐15‐0006
OT
MATERIAL REQUISITION FOR FIRE & GAS DEVICES
1
A
0.069%
24‐Jun‐17
4‐Jul‐17
9‐Jul‐17
9‐Aug‐17
30‐Aug‐17
9‐Sep‐17
31‐Oct‐18
29‐Jun‐17
19‐Jul‐17
20‐Jul‐17
2‐Aug‐17
3‐Aug‐17
1‐Oct‐17
22‐Jul‐19
29‐Jun‐17
19‐Jul‐17
20‐Jul‐17
2‐Aug‐17
3‐Aug‐17
1‐Oct‐17
95%
95%
0%
0.066%
0.066%
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
95%
95%
0%
0.092%
0.092%
1186
5
INSTRUMENTA
3963‐DGEN‐4‐15‐0014
1
A
14‐Jun‐17
24‐Jun‐17
31‐Oct‐18
8‐Jul‐17
6‐Aug‐17
8‐Aug‐17
1‐Oct‐17
12‐Oct‐17
12‐Oct‐17
8‐Jul‐17
6‐Aug‐17
8‐Aug‐17
1‐Oct‐17
12‐Oct‐17
12‐Oct‐17
1187
5
INSTRUMENTA
3963‐DGEN‐4‐17‐0014
OT
TECHNICAL BID EVALUATION FOR EXISTING SYSTEM MODIFICATIONS (HONEYWELL)
1
A
0.167%
19‐Aug‐17
29‐Aug‐17
3‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
28‐Nov‐17
30‐Nov‐17
13‐Dec‐17
26‐Dec‐17
26‐Dec‐17
22‐Jul‐19
19‐Oct‐17
28‐Nov‐17
30‐Nov‐17
13‐Dec‐17
26‐Dec‐17
26‐Dec‐17
95%
95%
0%
0.158%
0.158%
1188
5
INSTRUMENTA
3963‐DGEN‐4‐17‐0002
OT
OT
TECHNICAL BID EVALUATION FOR ELECTRONIC INSTRUMENTS (PT)
MATERIAL REQUISITION FOR EXISTING SYSTEM MODIFICATIONS (HONEYWELL)
1
B
0.139%
0.097%
26‐Aug‐17
5‐Sep‐17
10‐Sep‐17
17‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
4‐Nov‐17
6‐Nov‐17
30‐Nov‐17
7‐Feb‐18
7‐Feb‐18
22‐Jul‐19
19‐Oct‐17
4‐Nov‐17
6‐Nov‐17
30‐Nov‐17
7‐Feb‐18
7‐Feb‐18
95%
95%
0%
0.132%
0.132%
1189
5
INSTRUMENTA
3963‐DGEN‐4‐17‐0003
OT
TECHNICAL BID EVALUATION FOR LEVEL GAUGES (MAGNETIC)
1
A
0.139%
19‐Aug‐17
29‐Aug‐17
3‐Sep‐17
16‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
4‐Nov‐17
6‐Nov‐17
14‐Nov‐17
14‐Nov‐17
20‐Nov‐17
22‐Jul‐19
19‐Oct‐17
4‐Nov‐17
6‐Nov‐17
14‐Nov‐17
14‐Nov‐17
20‐Nov‐17
95%
95%
0%
0.132%
0.132%
1190
5
INSTRUMENTA
3963‐DGEN‐4‐17‐0004
OT
TECHNICAL BID EVALUATION FOR RESTRICTION ORIFICE
1
A
0.139%
30‐Aug‐17
14‐Sep‐17
21‐Sep‐17
31‐Oct‐18
19‐Oct‐17
18‐Dec‐17
10‐Jan‐18
18‐Jan‐18
18‐Jan‐18
18‐Jan‐18
22‐Jul‐19
19‐Oct‐17
18‐Dec‐17
10‐Jan‐18
18‐Jan‐18
18‐Jan‐18
18‐Jan‐18
1191
5
INSTRUMENTA
3963‐DGEN‐4‐17‐0005
OT
TECHNICAL BID EVALUATION FOR SHUTDOWN & BLOWDOWN VALVES
1
2
0.181%
22‐Jul‐17
1‐Aug‐17
6‐Aug‐17
24‐Aug‐17
3‐Sep‐17
13‐Sep‐17
31‐Oct‐18
27‐Jul‐17
27‐Nov‐17
30‐Nov‐17
21‐Dec‐17
26‐May‐18
26‐May‐18
22‐Jul‐19
27‐Jul‐17
27‐Nov‐17
30‐Nov‐17
21‐Dec‐17
26‐May‐18
26‐May‐18
95%
95%
0%
0.172%
0.172%
1192
5
INSTRUMENTA
3963‐DGEN‐4‐74‐0001
OT
HOOK‐UP DIAGRAM (PROCESS)
1
A
0.083%
2‐Aug‐17
12‐Aug‐17
17‐Aug‐17
7‐Sep‐17
16‐Sep‐17
19‐Sep‐17
31‐Oct‐18
1‐Aug‐17
2‐Aug‐17
3‐Aug‐17
29‐Aug‐17
18‐Oct‐17
19‐Oct‐17
22‐Jul‐19
1‐Aug‐17
2‐Aug‐17
3‐Aug‐17
29‐Aug‐17
18‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.079%
0.079%
1193
5
INSTRUMENTA
3963‐DGEN‐4‐74‐0002
OT
HOOK‐UP DIAGRAM PNEUMATIC)
1
A
0.083%
8‐Aug‐17
18‐Aug‐17
23‐Aug‐17
10‐Sep‐17
16‐Sep‐17
19‐Sep‐17
31‐Oct‐18
1‐Aug‐17
2‐Aug‐17
3‐Aug‐17
29‐Aug‐17
20‐Sep‐17
13‐Nov‐17
22‐Jul‐19
1‐Aug‐17
2‐Aug‐17
3‐Aug‐17
29‐Aug‐17
20‐Sep‐17
13‐Nov‐17
95%
95%
0%
0.079%
0.079%
OT
INSTRUMENT INSTALLATION DETAILS
19‐Oct‐17
0.111%
9‐Sep‐17
29‐Jun‐17
21‐Sep‐17
21‐Sep‐17
1‐Aug‐17
6‐Aug‐17
22‐Jul‐19
22‐Jul‐19
1‐Aug‐17
6‐Aug‐17
95%
95%
0%
0.132%
0.132%
1194
5
INSTRUMENTA
3963‐DGEN‐4‐78‐0001
1
A
16‐Aug‐17
26‐Aug‐17
31‐Aug‐17
15‐Sep‐17
21‐Sep‐17
21‐Sep‐17
31‐Oct‐18
8‐Aug‐17
5‐Sep‐17
20‐Sep‐17
8‐Aug‐17
5‐Sep‐17
20‐Sep‐17
19‐Oct‐17
95%
95%
0%
0.106%
0.106%
1195
5
INSTRUMENTA
3963‐FAHM‐4‐45‐0001
OT
SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (FAHM)
1
A
0.028%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
11‐Jul‐17
26‐Jul‐17
27‐Jul‐17
12‐Sep‐17
25‐Sep‐17
19‐Oct‐17
22‐Jul‐19
11‐Jul‐17
26‐Jul‐17
27‐Jul‐17
12‐Sep‐17
25‐Sep‐17
19‐Oct‐17
95%
95%
0%
0.026%
0.026%
1196
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0001
OT
DATA SHEET FOR PRESSURE GAUGES (FAHM)
1
B
0.028%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
17‐May‐17
13‐Jun‐17
14‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
22‐Jul‐19
17‐May‐17
13‐Jun‐17
14‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
95%
95%
0%
0.026%
0.026%
1197
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0002
OT
DATA SHEET FOR TEMP GAUGES (FAHM)
1
B
0.028%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
17‐May‐17
10‐Jun‐17
11‐Jun‐17
15‐Jul‐17
19‐Jul‐17
4‐Oct‐17
22‐Jul‐19
17‐May‐17
10‐Jun‐17
11‐Jun‐17
15‐Jul‐17
19‐Jul‐17
4‐Oct‐17
95%
95%
0%
0.026%
0.026%
1198
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0003
OT
DATA SHEET FOR PRESSURE TRANSMITTERS (FAHM)
1
B
0.028%
16‐May‐17
26‐May‐17
31‐May‐17
1‐Jul‐17
22‐Jul‐17
1‐Aug‐17
31‐Oct‐18
17‐May‐17
13‐Jun‐17
14‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
22‐Jul‐19
17‐May‐17
13‐Jun‐17
14‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
95%
95%
0%
0.026%
1199
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0004
OT
DATA SHEET FOR TEMP TRANSMITTERS (FAHM)
1
B
0.028%
16‐May‐17
26‐May‐17
31‐May‐17
1‐Jul‐17
22‐Jul‐17
1‐Aug‐17
31‐Oct‐18
15‐May‐17
10‐Jun‐17
11‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
22‐Jul‐19
15‐May‐17
10‐Jun‐17
11‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
95%
95%
0%
0.026%
0.026%
1200
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0005
OT
DATA SHEET FOR FLOWMETER ‐ CORIOLIS (FAHM)
1
A
0.042%
8‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
25‐May‐17
11‐Jul‐17
12‐Jul‐17
22‐Aug‐17
4‐Oct‐17
4‐Oct‐17
22‐Jul‐19
25‐May‐17
11‐Jul‐17
12‐Jul‐17
22‐Aug‐17
4‐Oct‐17
4‐Oct‐17
95%
95%
0%
0.040%
0.040%
1201
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0006
OT
DATA SHEET FOR LEVEL TRANSMITTERS (FAHM)
1
B
0.028%
22‐May‐17
1‐Jun‐17
6‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
15‐May‐17
19‐Jul‐17
20‐Jul‐17
14‐Sep‐17
25‐Sep‐17
14‐Dec‐17
22‐Jul‐19
15‐May‐17
19‐Jul‐17
20‐Jul‐17
14‐Sep‐17
25‐Sep‐17
14‐Dec‐17
95%
95%
0%
0.026%
0.026%
0.026%
1202
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0007
OT
DATA SHEET FOR BS&W ANALYSERS (FAHM)
1
A
0.042%
13‐May‐17
23‐May‐17
28‐May‐17
28‐Jun‐17
19‐Jul‐17
29‐Jul‐17
31‐Oct‐18
25‐May‐17
18‐Jun‐17
19‐Jun‐17
26‐Jul‐17
24‐Sep‐17
24‐Sep‐17
22‐Jul‐19
25‐May‐17
18‐Jun‐17
19‐Jun‐17
26‐Jul‐17
24‐Sep‐17
24‐Sep‐17
95%
95%
0%
0.040%
0.040%
1203
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0008
OT
DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (FAHM)
1
A
0.042%
2‐May‐17
12‐May‐17
17‐May‐17
17‐Jun‐17
8‐Jul‐17
18‐Jul‐17
31‐Oct‐18
4‐Apr‐17
15‐Aug‐17
17‐Aug‐17
27‐Sep‐17
18‐Oct‐17
26‐Dec‐17
22‐Jul‐19
4‐Apr‐17
15‐Aug‐17
17‐Aug‐17
27‐Sep‐17
18‐Oct‐17
26‐Dec‐17
95%
95%
0%
0.040%
0.040%
4‐May‐17
15‐Aug‐17
4‐May‐17
15‐Aug‐17
INSTRUMENTA
3963‐FAHM‐4‐13‐0009
DATA SHEET FOR CONTROL VALVES (FAHM)
1
A
0.042%
2‐May‐17
12‐May‐17
17‐May‐17
17‐Jun‐17
8‐Jul‐17
18‐Jul‐17
31‐Oct‐18
17‐Aug‐17
30‐Aug‐17
20‐Sep‐17
19‐Oct‐17
17‐Aug‐17
30‐Aug‐17
20‐Sep‐17
19‐Oct‐17
95%
95%
0%
0.040%
1205
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0010
OT
DATA SHEET FOR FLOWMETER ‐ VORTEX (FAHM)
1
A
0.042%
8‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
10‐May‐17
19‐Jun‐17
20‐Jun‐17
22‐Aug‐17
19‐Sep‐17
20‐Sep‐17
22‐Jul‐19
10‐May‐17
19‐Jun‐17
20‐Jun‐17
22‐Aug‐17
19‐Sep‐17
20‐Sep‐17
95%
95%
0%
0.040%
0.040%
1206
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0011
OT
DATA SHEET FOR RESTRICTION ORIFICE (FAHM)
1
A
0.028%
13‐May‐17
23‐May‐17
28‐May‐17
28‐Jun‐17
19‐Jul‐17
29‐Jul‐17
31‐Oct‐18
25‐May‐17
19‐Sep‐17
20‐Sep‐17
18‐Oct‐17
8‐Nov‐17
8‐Nov‐17
22‐Jul‐19
25‐May‐17
19‐Sep‐17
20‐Sep‐17
18‐Oct‐17
8‐Nov‐17
8‐Nov‐17
95%
95%
0%
0.026%
0.026%
95%
95%
0%
0.040%
0.040%
1204
5
OT
OT
1207
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0012
DATA SHEET FOR FIRE & GAS DEVICES (FAHM)
1
A
0.042%
22‐May‐17
1‐Jun‐17
6‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
15‐May‐17
24‐Jul‐17
10‐Aug‐17
28‐Sep‐17
22‐Jul‐19
15‐May‐17
18‐Jun‐17
24‐Jul‐17
10‐Aug‐17
28‐Sep‐17
5
INSTRUMENTA
3963‐FAHM‐4‐13‐0013
OT
DATA SHEET FOR LEVEL GAUGES (FAHM)
1
B
0.042%
23‐Jun‐17
28‐Jun‐17
1‐Jul‐17
1‐Aug‐17
22‐Aug‐17
1‐Sep‐17
31‐Oct‐18
15‐May‐17
19‐Jul‐17
20‐Jul‐17
20‐Jul‐17
22‐Aug‐17
23‐Aug‐17
22‐Jul‐19
15‐May‐17
19‐Jul‐17
20‐Jul‐17
20‐Jul‐17
22‐Aug‐17
23‐Aug‐17
95%
95%
0%
0.040%
0.040%
1209
5
INSTRUMENTA
3963‐FAHM‐4‐00‐0001
OT
INSTRUMENT INDEX (FAHM)
1
A
0.028%
30‐May‐17
9‐Jun‐17
14‐Jun‐17
15‐Jul‐17
5‐Aug‐17
15‐Aug‐17
31‐Oct‐18
31‐May‐17
10‐Jun‐17
11‐Jun‐17
2‐Aug‐17
3‐Aug‐17
5‐Oct‐17
22‐Jul‐19
31‐May‐17
10‐Jun‐17
11‐Jun‐17
2‐Aug‐17
3‐Aug‐17
5‐Oct‐17
95%
95%
0%
0.026%
0.026%
1210
5
INSTRUMENTA
3963‐FAHM‐4‐39‐0001
OT
INPUT / OUTPUT LIST ‐ DCS/ESD/F&G (FAHM)
1
A
0.028%
5‐Jun‐17
15‐Jun‐17
20‐Jun‐17
21‐Jul‐17
11‐Aug‐17
21‐Aug‐17
31‐Oct‐18
8‐Jun‐17
10‐Jul‐17
11‐Jul‐17
2‐Aug‐17
3‐Aug‐17
7‐Dec‐17
22‐Jul‐19
8‐Jun‐17
10‐Jul‐17
11‐Jul‐17
2‐Aug‐17
3‐Aug‐17
7‐Dec‐17
95%
95%
0%
0.026%
0.026%
1211
5
INSTRUMENTA
3963‐FAHM‐4‐67‐0001
OT
ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (FAHM)
1
A
0.028%
19‐Jun‐17
29‐Jun‐17
4‐Jul‐17
4‐Aug‐17
25‐Aug‐17
4‐Sep‐17
31‐Oct‐18
22‐Jun‐17
30‐Jul‐17
31‐Jul‐17
17‐Sep‐17
25‐Sep‐17
10‐Dec‐17
22‐Jul‐19
22‐Jun‐17
30‐Jul‐17
31‐Jul‐17
17‐Sep‐17
25‐Sep‐17
10‐Dec‐17
95%
95%
0%
0.026%
0.026%
1212
5
INSTRUMENTA
3963‐FAHM‐4‐37‐0001
OT
INSTRUMENT CABLE SCHEDULE ‐ DCS/ESD/F&G (FAHM)
1
A
0.028%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jun‐17
29‐Jul‐17
30‐Jul‐17
4‐Oct‐17
18‐Oct‐17
19‐Oct‐17
22‐Jul‐19
28‐Jun‐17
29‐Jul‐17
30‐Jul‐17
4‐Oct‐17
18‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.026%
1213
5
INSTRUMENTA
3963‐FAHM‐4‐30‐0002
OT
INSTRUMENT JUNCTION BOX SCHEDULE (FAHM)
1
A
0.028%
28‐Jun‐17
8‐Jul‐17
13‐Jul‐17
13‐Aug‐17
3‐Sep‐17
13‐Sep‐17
31‐Oct‐18
28‐Jun‐17
2‐Aug‐17
3‐Aug‐17
4‐Oct‐17
16‐Oct‐17
29‐Nov‐17
22‐Jul‐19
28‐Jun‐17
2‐Aug‐17
3‐Aug‐17
4‐Oct‐17
16‐Oct‐17
29‐Nov‐17
95%
95%
0%
0.026%
0.026%
1214
5
INSTRUMENTA
3963‐FAHM‐4‐31‐0001
OT
INSTRUMENT MTO’S (FAHM)
3
A
0.042%
10‐Aug‐17
20‐Aug‐17
25‐Aug‐17
8‐Sep‐17
13‐Sep‐17
13‐Sep‐17
31‐Oct‐18
28‐Sep‐17
29‐Sep‐17
1‐Oct‐17
8‐Nov‐17
8‐Nov‐17
14‐Dec‐17
22‐Jul‐19
28‐Sep‐17
29‐Sep‐17
1‐Oct‐17
8‐Nov‐17
8‐Nov‐17
14‐Dec‐17
95%
95%
0%
0.040%
0.040%
1215
5
INSTRUMENTA
3963‐FAHM‐4‐55‐0001
OT
INSTRUMENT CABLE BLOCK DIAGRAM (FAHM)
1
A
0.028%
6‐May‐17
16‐May‐17
21‐May‐17
21‐Jun‐17
12‐Jul‐17
22‐Jul‐17
31‐Oct‐18
25‐May‐17
5‐Jun‐17
5‐Jun‐17
26‐Jul‐17
10‐Aug‐17
19‐Oct‐17
22‐Jul‐19
25‐May‐17
5‐Jun‐17
5‐Jun‐17
26‐Jul‐17
10‐Aug‐17
19‐Oct‐17
95%
95%
0%
0.026%
0.026%
1216
5
INSTRUMENTA
3963‐FAHM‐4‐56‐0001
1
A
0.028%
13‐May‐17
23‐May‐17
28‐May‐17
28‐Jun‐17
29‐Jul‐17
31‐Oct‐18
25‐May‐17
5‐Jun‐17
5‐Jun‐17
26‐Jul‐17
10‐Aug‐17
19‐Oct‐17
22‐Jul‐19
25‐May‐17
5‐Jun‐17
5‐Jun‐17
26‐Jul‐17
10‐Aug‐17
19‐Oct‐17
1217
5
INSTRUMENTA
3963‐FAHM‐4‐50‐0001
OT
INSTRUMENT LOCATION LAYOUT (FAHM)
1
A
0.042%
29‐Apr‐17
9‐May‐17
14‐May‐17
14‐Jun‐17
5‐Jul‐17
15‐Jul‐17
31‐Oct‐18
18‐May‐17
19‐May‐17
21‐May‐17
5‐Oct‐17
12‐Oct‐17
12‐Oct‐17
22‐Jul‐19
18‐May‐17
19‐May‐17
21‐May‐17
5‐Oct‐17
12‐Oct‐17
12‐Oct‐17
95%
95%
0%
0.040%
0.040%
1218
5
INSTRUMENTA
3963‐FAHM‐4‐65‐0001
OT
INSTRUMENT INTERCONNECTION DIAGRAM (FAHM)
1
A
0.042%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
11‐Jul‐17
10‐Oct‐17
12‐Oct‐17
19‐Nov‐17
7‐Dec‐17
7‐Dec‐17
22‐Jul‐19
11‐Jul‐17
10‐Oct‐17
12‐Oct‐17
19‐Nov‐17
7‐Dec‐17
7‐Dec‐17
95%
95%
0%
0.040%
0.040%
1219
5
INSTRUMENTA
3963‐FAHM‐4‐65‐0002
OT
FIRE & GAS INTERCONNECTION DIAGRAM (FAHM)
1
A
0.042%
21‐Jun‐17
1‐Jul‐17
6‐Jul‐17
6‐Aug‐17
27‐Aug‐17
6‐Sep‐17
31‐Oct‐18
22‐Jun‐17
20‐Oct‐17
22‐Oct‐17
27‐Nov‐17
11‐Dec‐17
11‐Dec‐17
22‐Jul‐19
22‐Jun‐17
20‐Oct‐17
22‐Oct‐17
27‐Nov‐17
11‐Dec‐17
11‐Dec‐17
95%
95%
0%
0.040%
0.040%
1220
5
INSTRUMENTA
3963‐FAHM‐4‐66‐0001
OT
INSTRUMENT LOOP DIAGRAM (FAHM)
1
A
0.056%
18‐Jul‐17
23‐Jul‐17
23‐Aug‐17
17‐Sep‐17
31‐Oct‐18
11‐Jul‐17
17‐Nov‐17
19‐Nov‐17
7‐Dec‐17
12‐Mar‐18
12‐Mar‐18
22‐Jul‐19
11‐Jul‐17
17‐Nov‐17
19‐Nov‐17
7‐Dec‐17
12‐Mar‐18
12‐Mar‐18
1221
5
INSTRUMENTA
3963‐FAHM‐4‐66‐0002
OT
FIRE & GAS LOOP DIAGRAM (FAHM)
1
A
0.028%
29‐Jul‐17
8‐Aug‐17
13‐Aug‐17
31‐Aug‐17
10‐Sep‐17
20‐Sep‐17
31‐Oct‐18
19‐Oct‐17
4‐Nov‐17
6‐Nov‐17
29‐Nov‐17
11‐Jan‐18
11‐Jan‐18
22‐Jul‐19
19‐Oct‐17
4‐Nov‐17
6‐Nov‐17
29‐Nov‐17
11‐Jan‐18
11‐Jan‐18
95%
95%
0%
0.026%
0.026%
1222
5
INSTRUMENTA
3963‐FAHN‐4‐45‐0001
OT
SCOPE OF WORK FOR EXISTING SYSTEM MODIFICATIONS (FAHN)
1
A
0.028%
14‐Jun‐17
24‐Jun‐17
29‐Jun‐17
30‐Jul‐17
20‐Aug‐17
30‐Aug‐17
31‐Oct‐18
8‐Jul‐17
26‐Jul‐17
27‐Jul‐17
12‐Sep‐17
25‐Sep‐17
19‐Oct‐17
22‐Jul‐19
8‐Jul‐17
26‐Jul‐17
27‐Jul‐17
12‐Sep‐17
25‐Sep‐17
19‐Oct‐17
95%
95%
0%
0.026%
0.026%
1223
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0001
OT
DATA SHEET FOR PRESSURE GAUGES (FAHN)
1
B
0.028%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
15‐May‐17
13‐Jun‐17
14‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
22‐Jul‐19
15‐May‐17
13‐Jun‐17
14‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
95%
95%
0%
0.026%
0.026%
1224
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0002
OT
DATA SHEET FOR TEMP GAUGES (FAHN)
1
B
0.028%
24‐May‐17
3‐Jun‐17
8‐Jun‐17
9‐Jul‐17
30‐Jul‐17
9‐Aug‐17
31‐Oct‐18
15‐May‐17
10‐Jun‐17
11‐Jun‐17
15‐Jul‐17
19‐Jul‐17
4‐Oct‐17
22‐Jul‐19
15‐May‐17
10‐Jun‐17
11‐Jun‐17
15‐Jul‐17
19‐Jul‐17
4‐Oct‐17
95%
95%
0%
0.026%
0.026%
1225
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0003
OT
DATA SHEET FOR PRESSURE TRANSMITTERS (FAHN)
1
B
0.028%
16‐May‐17
26‐May‐17
31‐May‐17
1‐Jul‐17
22‐Jul‐17
1‐Aug‐17
31‐Oct‐18
15‐May‐17
13‐Jun‐17
14‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
22‐Jul‐19
15‐May‐17
13‐Jun‐17
14‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
95%
95%
0%
0.026%
1226
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0004
OT
DATA SHEET FOR TEMP TRANSMITTERS (FAHN)
1
B
0.028%
16‐May‐17
26‐May‐17
31‐May‐17
1‐Jul‐17
22‐Jul‐17
1‐Aug‐17
31‐Oct‐18
15‐May‐17
10‐Jun‐17
11‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
22‐Jul‐19
15‐May‐17
10‐Jun‐17
11‐Jun‐17
15‐Jul‐17
19‐Jul‐17
24‐Sep‐17
95%
95%
0%
0.026%
0.026%
1227
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0005
OT
DATA SHEET FOR FLOWMETER ‐ CORIOLIS (FAHN)
1
A
0.042%
8‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
25‐May‐17
11‐Jul‐17
12‐Jul‐17
22‐Aug‐17
4‐Oct‐17
4‐Oct‐17
22‐Jul‐19
25‐May‐17
11‐Jul‐17
12‐Jul‐17
22‐Aug‐17
4‐Oct‐17
4‐Oct‐17
95%
95%
0%
0.040%
0.040%
1228
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0006
OT
DATA SHEET FOR LEVEL TRANSMITTERS (FAHN)
1
B
0.028%
22‐May‐17
1‐Jun‐17
6‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
17‐May‐17
19‐Jul‐17
20‐Jul‐17
14‐Sep‐17
25‐Sep‐17
14‐Dec‐17
22‐Jul‐19
17‐May‐17
19‐Jul‐17
20‐Jul‐17
14‐Sep‐17
25‐Sep‐17
14‐Dec‐17
95%
95%
0%
0.026%
0.026%
F&G CABLE BLOCK DIAGRAM (FAHM)
8‐Jul‐17
19‐Jul‐17
10‐Sep‐17
18‐Jun‐17
17‐Jun‐17
0.040%
1208
OT
17‐Jun‐17
22‐Jul‐19
95%
95%
95%
95%
0%
0%
0.026%
0.053%
0.026%
0.026%
0.053%
0.026%
1229
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0007
OT
DATA SHEET FOR BS&W ANALYSERS (FAHN)
1
A
0.042%
13‐May‐17
23‐May‐17
28‐May‐17
28‐Jun‐17
19‐Jul‐17
29‐Jul‐17
31‐Oct‐18
25‐May‐17
18‐Jun‐17
19‐Jun‐17
26‐Jul‐17
24‐Sep‐17
24‐Sep‐17
22‐Jul‐19
25‐May‐17
18‐Jun‐17
19‐Jun‐17
26‐Jul‐17
24‐Sep‐17
24‐Sep‐17
95%
95%
0%
0.040%
0.040%
1230
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0008
OT
DATA SHEET FOR SHUTDOWN & BLOWDOWN VALVES (FAHN)
1
A
0.042%
2‐May‐17
12‐May‐17
17‐May‐17
17‐Jun‐17
8‐Jul‐17
18‐Jul‐17
31‐Oct‐18
4‐Apr‐17
15‐Aug‐17
17‐Aug‐17
27‐Sep‐17
18‐Oct‐17
26‐Dec‐17
22‐Jul‐19
4‐Apr‐17
15‐Aug‐17
17‐Aug‐17
27‐Sep‐17
18‐Oct‐17
26‐Dec‐17
95%
95%
0%
0.040%
0.040%
1231
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0009
DATA SHEET FOR CONTROL VALVES (FAHN)
1
A
0.042%
2‐May‐17
12‐May‐17
17‐May‐17
17‐Jun‐17
8‐Jul‐17
18‐Jul‐17
31‐Oct‐18
3‐Aug‐17
30‐Aug‐17
20‐Sep‐17
19‐Oct‐17
3‐Aug‐17
30‐Aug‐17
20‐Sep‐17
19‐Oct‐17
1232
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0010
OT
DATA SHEET FOR FLOWMETER ‐ VORTEX (FAHN)
1
B
0.042%
8‐May‐17
18‐May‐17
23‐May‐17
23‐Jun‐17
14‐Jul‐17
24‐Jul‐17
31‐Oct‐18
10‐May‐17
19‐Jun‐17
20‐Jun‐17
22‐Aug‐17
18‐Oct‐17
19‐Oct‐17
22‐Jul‐19
10‐May‐17
19‐Jun‐17
20‐Jun‐17
22‐Aug‐17
18‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.040%
0.040%
1233
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0011
OT
DATA SHEET FOR RESTRICTION ORIFICE (FAHN)
1
A
0.028%
13‐May‐17
23‐May‐17
28‐May‐17
28‐Jun‐17
19‐Jul‐17
29‐Jul‐17
31‐Oct‐18
25‐May‐17
19‐Sep‐17
20‐Sep‐17
18‐Oct‐17
8‐Nov‐17
8‐Nov‐17
22‐Jul‐19
25‐May‐17
19‐Sep‐17
20‐Sep‐17
18‐Oct‐17
8‐Nov‐17
8‐Nov‐17
95%
95%
0%
0.026%
0.026%
1234
5
INSTRUMENTA
3963‐FAHN‐4‐13‐0012
OT
DATA SHEET FOR FIRE & GAS DEVICES (FAHN)
1
A
0.042%
22‐May‐17
1‐Jun‐17
6‐Jun‐17
6‐Jul‐17
27‐Jul‐17
6‐Aug‐17
31‐Oct‐18
17‐May‐17
17‐Jun‐17
18‐Jun‐17
24‐Jul‐17
10‐Aug‐17
28‐Sep‐17
22‐Jul‐19
17‐May‐17
17‐Jun‐17
18‐Jun‐17
24‐Jul‐17
10‐Aug‐17
28‐Sep‐17
95%
95%
0%
0.040%
0.040%
1235
5
1
B
28‐Jun‐17
1‐Jul‐17
1‐Aug‐17
22‐Aug‐17
6‐Aug‐17
20‐Jul‐17
OT
3‐May‐17
1‐Aug‐17
22‐Jul‐19
3‐May‐17
1‐Aug‐17
95%
95%
0%
0.040%
0.040%
INSTRUMENTA
3963‐FAHN‐4‐13‐0013
OT
DATA SHEET FOR LEVEL GAUGES (FAHN)
0.042%
23‐Jun‐17
31‐Oct‐18
15‐May‐17
19‐Jul‐17
20‐Jul‐17
20‐Jul‐17
22‐Aug‐17
23‐Aug‐17
22‐Jul‐19
15‐May‐17
19‐Jul‐17
20‐Jul‐17
22‐Aug‐17
23‐Aug‐17
95%
95%
0%
0.040%
0.040%
1236
5
INSTRUMENTA
3963‐FAHN‐4‐00‐0001
OT
INSTRUMENT INDEX (FAHN)
1
A
0.028%
30‐May‐17
9‐Jun‐17
14‐Jun‐17
15‐Jul‐17
5‐Aug‐17
15‐Aug‐17
31‐Oct‐18
31‐May‐17
10‐Jun‐17
11‐Jun‐17
2‐Aug‐17
3‐Aug‐17
20‐Nov‐17
22‐Jul‐19
31‐May‐17
10‐Jun‐17
11‐Jun‐17
2‐Aug‐17
3‐Aug‐17
20‐Nov‐17
95%
95%
0%
0.026%
0.026%
1237
5
INSTRUMENTA
3963‐FAHN‐4‐39‐0001
OT
INPUT / OUTPUT LIST ‐ DCS/ESD/F&G (FAHN)
1
A
0.028%
5‐Jun‐17
15‐Jun‐17
20‐Jun‐17
21‐Jul‐17
11‐Aug‐17
21‐Aug‐17
31‐Oct‐18
8‐Jun‐17
10‐Jul‐17
11‐Jul‐17
2‐Aug‐17
3‐Aug‐17
7‐Dec‐17
22‐Jul‐19
8‐Jun‐17
10‐Jul‐17
11‐Jul‐17
2‐Aug‐17
3‐Aug‐17
7‐Dec‐17
95%
95%
0%
0.026%
0.026%
1238
5
INSTRUMENTA
3963‐FAHN‐4‐67‐0001
OT
ALARM & TRIP LIST (MAJOR INPUT BY PROCESS) (FAHN)
1
A
0.028%
19‐Jun‐17
29‐Jun‐17
4‐Jul‐17
4‐Aug‐17
25‐Aug‐17
4‐Sep‐17
31‐Oct‐18
22‐Jun‐17
30‐Jul‐17
31‐Jul‐17
17‐Sep‐17
25‐Sep‐17
10‐Dec‐17
22‐Jul‐19
22‐Jun‐17
30‐Jul‐17
31‐Jul‐17
17‐Sep‐17
25‐Sep‐17
10‐Dec‐17
95%
95%
0%
0.026%
0.026%
1239
5
INSTRUMENTA
3963‐FAHN‐4‐37‐0001
OT
INSTRUMENT CABLE SCHEDULE ‐ DCS/ESD/F&G (FAHN)
1
A
0.028%
25‐Jun‐17
5‐Jul‐17
10‐Jul‐17
10‐Aug‐17
31‐Aug‐17
10‐Sep‐17
31‐Oct‐18
28‐Jun‐17
29‐Jul‐17
30‐Jul‐17
4‐Oct‐17
18‐Oct‐17
19‐Oct‐17
22‐Jul‐19
28‐Jun‐17
29‐Jul‐17
30‐Jul‐17
4‐Oct‐17
18‐Oct‐17
19‐Oct‐17
95%
95%
0%
0.026%
0.026%
Page 10 of 13
Page 81 of 170
PROJECT PLANNING PACKAGE
Attachment 8
PROCUREMENT REGISTER
Page 82 of 170
Procurement Control Register - Equipment Project No. - 3963 "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" As Of : 25-Oct-18 SL. No.
Description
Proc. Category
Sec.
Progress Scale
1.0 LONG LEAD ITEMS
Issue MR
Issue RFQ to Vendors
Issue Purchase Order
Approve Vendor Document (QP)
5%
10%
15%
30%
Received Filled SPIR Inspection cleared & Ex-works Del. & FOB (Mftg.) FAT Complete
40%
60%
70%
Materails received and cleared at site
QP inspected and cleared material at site
All Spare parts received & SPIR completed
% Weight
85%
90%
100%
WTGE
P 75.80%
F A
1
1.2 BS&W Meter 1.3 Sand Jetting
% Variance
75.800%
(10.569)
65.231%
0.00%
65.231%
P F A P F A P F A
13-May-17 28-May-17 28-May-17 01-Jun-17 12-Jul-17 12-Jul-17 13-May-17 28-May-17 28-May-17
13-May-17 12-Jun-17 12-Jun-17 01-Jun-17 23-Jul-17 23-Jul-17 13-May-17 12-Jun-17 12-Jun-17
19-Jul-17 12-Sep-17 12-Sep-17 09-Aug-17 18-Jan-18 18-Jan-18 19-Jul-17 12-Sep-17 12-Sep-17
10-Sep-17 26-Oct-17 26-Oct-17 12-Oct-17 17-May-18 17-May-18 10-Sep-17 26-Oct-17 26-Oct-17
08-Dec-17 18-Jan-18 18-Jan-18 09-Jan-18 24-May-18 24-May-18 08-Dec-17 18-Jan-18 18-Jan-18
04-Jul-18 11-Jun-18 11-Jun-18 12-Feb-18 12-Jul-18 12-Jul-18 04-Jul-18 11-Jun-18 11-Jun-18
10-Jul-18 14-Jun-18 14-Jun-18 18-Feb-18 30-Aug-18 30-Aug-18 10-Jul-18 14-Jun-18 14-Jun-18
24-Jul-18 03-Jul-18 03-Jul-18 03-Apr-18 04-Oct-18 04-Oct-18 24-Jul-18 03-Jul-18 03-Jul-18
27-Jul-18 25-Aug-18 25-Aug-18 06-Apr-18 29-Nov-18
27-Jul-18 25-Aug-18 25-Aug-18 06-Apr-18 29-Nov-18
27-Jul-18 25-Aug-18 25-Aug-18
27-Jul-18 25-Aug-18 25-Aug-18
1.47%
P F A
03-Apr-17 03-Apr-17 03-Apr-17
03-Apr-17 03-Apr-17 03-Apr-17
08-May-17 11-May-17 11-May-17
27-May-17 04-Jul-17 04-Jul-17
15-Jun-17 03-Aug-17 03-Aug-17
15-Aug-17 24-Aug-17 24-Aug-17
28-Aug-17 21-Sep-17 21-Sep-17
30-Sep-17 31-Oct-17 31-Oct-17
04-Oct-17 27-Nov-17 27-Nov-17
04-Oct-17 27-Nov-17 27-Nov-17
1.51%
P F A P F A P F A P F A P F A P F A P F A P F A P F A P F A
10-Aug-17 19-Jul-17 19-Jul-17 10-Aug-17 24-Jul-17 24-Jul-17 10-Aug-17 20-Jul-17 20-Jul-17 10-Aug-17 24-Jul-17 24-Jul-17 10-Aug-17 25-Jul-17 25-Jul-17 10-Aug-17 25-Jul-17 25-Jul-17 15-Jun-17 02-Aug-17 02-Aug-17 15-Jun-17 19-Jun-17 19-Jun-17 15-Jun-17 13-Jul-17 13-Jul-17 15-Jun-17 03-Aug-17 03-Aug-17
10-Aug-17 23-Jul-17 23-Jul-17 10-Aug-17 26-Jul-17 26-Jul-17 10-Aug-17 23-Jul-17 23-Jul-17 10-Aug-17 26-Jul-17 26-Jul-17 10-Aug-17 30-Jul-17 30-Jul-17 10-Aug-17 30-Jul-17 30-Jul-17 15-Jun-17 12-Nov-17 12-Nov-17 15-Jun-17 20-Aug-17 20-Aug-17 15-Jun-17 23-Jul-17 23-Jul-17 15-Jun-17 06-Aug-17 06-Aug-17
19-Oct-17 18-Jan-18 18-Jan-18 19-Oct-17 12-Dec-17 12-Dec-17 19-Oct-17 30-Jan-18 30-Jan-18 19-Oct-17 15-Feb-18 15-Feb-18 19-Oct-17 28-Dec-17 28-Dec-17 19-Oct-17 30-Jan-18 30-Jan-18 23-Aug-17 15-Feb-18 15-Feb-18 23-Aug-17 05-Apr-18 05-Apr-18 23-Aug-17 18-Jan-18 18-Jan-18 23-Aug-17 19-Nov-17 19-Nov-17
07-Dec-17 22-Apr-18 22-Apr-18 07-Dec-17 28-Mar-18 28-Mar-18 07-Dec-17 28-Mar-18 28-Mar-18 07-Dec-17 02-Sep-18 02-Sep-18 07-Dec-17 29-Apr-18 29-Apr-18 07-Dec-17 12-Apr-18 12-Apr-18 11-Oct-17 10-May-18 10-May-18 11-Oct-17 30-Aug-18 30-Aug-18 11-Oct-17 06-May-18 06-May-18 11-Oct-17 28-Dec-17 28-Dec-17
05-Jan-18 10-May-18 10-May-18 05-Jan-18 08-Feb-18 08-Feb-18 05-Jan-18 15-Feb-18 15-Feb-18 05-Jan-18 17-May-18 17-May-18 05-Jan-18 08-Feb-18 08-Feb-18 05-Jan-18 15-Mar-18 15-Mar-18 08-Jan-18 15-Mar-18 15-Mar-18 08-Jan-18 15-Sep-18 15-Sep-18 08-Jan-18 15-Feb-18 15-Feb-18 08-Jan-18 13-Dec-17 13-Dec-17
02-Feb-18 30-Aug-18 30-Aug-18 02-Feb-18 02-Sep-18 02-Sep-18 02-Feb-18 30-Aug-18 30-Aug-18 02-Feb-18 05-Sep-18 05-Sep-18 02-Feb-18 02-Sep-18 02-Sep-18 02-Feb-18 02-Sep-18 02-Sep-18 24-Feb-18 04-Jul-18 04-Jul-18 24-Feb-18 02-Oct-18 02-Oct-18 24-Feb-18 20-Sep-18 20-Sep-18 24-Feb-18 28-May-18 28-May-18
08-Feb-18 03-Sep-18 03-Sep-18 08-Feb-18 02-Sep-18 02-Sep-18 08-Feb-18 02-Sep-18 02-Sep-18 08-Feb-18 04-Dec-18
09-Mar-18 27-Sep-18 27-Sep-18 09-Mar-18 03-Oct-18 03-Oct-18 09-Mar-18 13-Sep-18 13-Sep-18 09-Mar-18 07-Dec-18
12-Mar-18 10-Dec-18
12-Mar-18 10-Dec-18
4.16%
12-Mar-18 10-Dec-18
12-Mar-18 10-Dec-18
0.46%
12-Mar-18 10-Dec-18
12-Mar-18 10-Dec-18
3.24%
12-Mar-18 10-Dec-18
12-Mar-18 10-Dec-18
0.46%
08-Feb-18 10-Sep-18 10-Sep-18 08-Feb-18 10-Sep-18 10-Sep-18 02-Mar-18 12-Jul-18 12-Jul-18 02-Mar-18 29-Nov-18
09-Mar-18 01-Nov-18 01-Nov-18 09-Mar-18 29-Nov-18
12-Mar-18 10-Dec-18
12-Mar-18 10-Dec-18
0.92%
12-Mar-18 10-Dec-18
12-Mar-18 10-Dec-18
1.39%
15-Apr-18 02-Aug-18 02-Aug-18 15-Apr-18 16-Dec-18
18-Apr-18 03-Sep-18 03-Sep-18 18-Apr-18 20-Dec-18
18-Apr-18 03-Sep-18 03-Sep-18 18-Apr-18 20-Dec-18
02-Mar-18 25-Sep-18 25-Sep-18 02-Mar-18 31-May-18 31-May-18
15-Apr-18 30-Sep-18 30-Sep-18 15-Apr-18 12-Jul-18 12-Jul-18
18-Apr-18 10-Dec-18
18-Apr-18 10-Dec-18
18-Apr-18 28-Aug-18 28-Aug-18
18-Apr-18 28-Aug-18 28-Aug-18
Piping
2.1 Early Tie-in Valves 3
% Phy. Comp.
Equipment
1.1 Test Separator
2
% Progress
Instrumentation
3.1
ELECTRONIC INSTRUMENTS (PT/TT)
3.2
LEVEL GAUGES (MAGNETIC)
3.3 GAUGES (PG/TG) 3.4
LEVEL GAUGES (GLASS TYPE)
3.5
LEVEL TRANSMITTERS (DISPLACER)
3.6
LEVEL TRANSMITTERS (RADAR)
3.7
RESTRICTION ORIFICE
3.8
SHUTDOWN & BLOWDOWN VALVES
3.9
FLOW TRANSMITTERS
3.10 CONTROL VALVES
Field Instrumentat ion
Control Valve / SD & BD Valve / PRV/ Orifice / Flow Meters
12.16% 3.42%
2.09% 2.09% 2.09% 2.09%
100.00% 100.00% 100.00% 100.00% 85.00% 85.00% 100.00% 100.00% 100.00%
0.00 0.00 (15.00) 0.00 0.00 0.00
100.00% 100.00% 100.00%
0.00 0.00
100.00% 85.00% 85.00% 100.00% 85.00% 85.00% 100.00% 85.00% 85.00% 100.00% 60.00% 60.00% 100.00% 70.00% 70.00% 100.00% 70.00% 70.00% 100.00% 100.00% 100.00% 100.00% 60.00% 60.00% 100.00% 85.00% 85.00% 100.00% 100.00% 100.00%
(15.00) 0.00
Page 83 of 170
(15.00) 0.00 (15.00) 0.00 (40.00) 0.00 (30.00) 0.00 (30.00) 0.00 0.00 0.00 (40.00) 0.00 (15.00) 0.00 0.00 0.00
Procurement Control Register - Equipment Project No. - 3963 "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" As Of : 25-Oct-18 SL. No.
Description
Proc. Category
EXISTING SYSTEM 3.12 MODIFICATIONS (HONEYWELL) EXISTING SYSTEM 3.13 MODIFICATIONS (EMERSON) EXISTING SYSTEM 3.14 MODIFICATIONS (YOKOGAWA)-KHATIYAH EXISTING SYSTEM 3.15 MODIFICATIONS (YOKOGAWA)-JALEHA 4 Electrical 4.1 Junction Box/Lighting Fixture 5
Modification of Existing System, Yokogawa,E merson, Honey well
5.2
Deluge Skids and Fire water Spray Nozzles
5.3
Firefighting & Safety Equipment
Approve Vendor Document (QP)
Received Filled SPIR Inspection cleared & Ex-works Del. & FOB (Mftg.) FAT Complete
Materails received and cleared at site
QP inspected and cleared material at site
All Spare parts received & SPIR completed
Issue MR
5%
10%
15%
30%
40%
60%
70%
85%
90%
100%
WTGE
P F A P F A P F A P F A P F A
15-Jun-17 15-Aug-17 15-Aug-17 29-Jun-17 03-Aug-17 03-Aug-17 29-Jun-17 10-Aug-17 10-Aug-17 29-Jun-17 27-Jul-17 27-Jul-17 29-Jun-17 27-Jul-17 27-Jul-17
15-Jun-17 19-Aug-17 19-Aug-17 29-Jun-17 17-Oct-01 17-Oct-01 29-Jun-17 17-Oct-17 17-Oct-17 29-Jun-17 10-Aug-17 10-Aug-17 29-Jun-17 10-Aug-17 10-Aug-17
23-Aug-17 04-Jan-18 04-Jan-18 06-Sep-17 28-Dec-17 28-Dec-17 06-Sep-17 28-Dec-17 28-Dec-17 06-Sep-17 21-Dec-17 21-Dec-17 06-Sep-17 21-Dec-17 21-Dec-17
11-Oct-17 27-Mar-18 27-Mar-18 25-Oct-17 17-May-18 17-May-18 25-Oct-17 17-May-18 17-May-18 25-Oct-17 21-Dec-17 21-Dec-17 25-Oct-17 28-Jun-18 28-Jun-18
08-Jan-18 19-Mar-18 19-Mar-18 22-Jan-18 08-Feb-18 08-Feb-18 22-Jan-18 10-May-18 10-May-18 22-Jan-18 21-Dec-17 21-Dec-17 22-Jan-18 10-May-18 10-May-18
24-Feb-18 28-Jun-18 28-Jun-18 27-Mar-18 19-Jul-18 19-Jul-18 27-Mar-18 07-Jun-18 07-Jun-18 27-Mar-18 28-Dec-17 28-Dec-17 27-Mar-18 05-Sep-18 05-Sep-18
02-Mar-18 05-Jul-18 05-Jul-18 02-Apr-18 19-Jul-18 19-Jul-18 02-Apr-18 12-Jul-18 12-Jul-18 02-Apr-18 04-Jan-18 04-Jan-18 02-Apr-18 05-Sep-18 05-Sep-18
15-Apr-18 15-Sep-18 15-Sep-18 01-May-18 19-Jul-18 19-Jul-18 01-May-18 27-Sep-18 27-Sep-18 01-May-18 11-Jan-18 11-Jan-18 01-May-18 27-Sep-18 27-Sep-18
18-Apr-18 10-Dec-18
18-Apr-18 10-Dec-18
2.09%
04-May-18 19-Jul-18 19-Jul-18 04-May-18 10-Dec-18
04-May-18 19-Jul-18 19-Jul-18 04-May-18 10-Dec-18
04-May-18 18-Jan-18 18-Jan-18 04-May-18 10-Dec-18
04-May-18 18-Jan-18 18-Jan-18 04-May-18 10-Dec-18
P F A
10-Jul-17 30-Jul-17 30-Jul-17
10-Jul-17 14-Aug-17 14-Aug-17
18-Sep-17 06-Mar-18 06-Mar-18
06-Nov-17 07-May-18 07-May-18
20-Nov-17 10-May-18 10-May-18
09-Dec-17 31-May-18 31-May-18
15-Dec-17 18-Jul-18 18-Jul-18
13-Jan-18 26-Aug-18 26-Aug-18
16-Jan-18 30-Sep-18 30-Sep-18
16-Jan-18 30-Sep-18 30-Sep-18
P F A P F A P F A
11-Jul-17 23-Jul-17 23-Jul-17 20-Jul-17 25-Jul-17 25-Jul-17 20-Jul-17 25-Jul-17 25-Jul-17
11-Jul-17 03-Aug-17 03-Aug-17 20-Jul-17 03-Aug-17 03-Aug-17 20-Jul-17 03-Aug-17 03-Aug-17
23-Sep-17 25-Jan-18 25-Jan-18 28-Sep-17 22-Feb-18 22-Feb-18 28-Sep-17 01-Mar-18 01-Mar-18
11-Nov-17 30-Apr-18 30-Apr-18 16-Nov-17 17-May-18 17-May-18 16-Nov-17 28-Jun-18 28-Jun-18
25-Dec-17 10-May-18 10-May-18 30-Dec-17 24-May-18 24-May-18 30-Dec-17 17-May-18 17-May-18
24-Feb-18 30-Aug-18 30-Aug-18 02-Apr-18 02-Oct-18 02-Oct-18 13-Feb-18 13-Sep-18 13-Sep-18
02-Mar-18 30-Aug-18 30-Aug-18 08-Apr-18 03-Jan-19
31-Mar-18 30-Sep-18 30-Sep-18 07-May-18 15-Jan-19
03-Apr-18 10-Dec-18
03-Apr-18 10-Dec-18
3.22%
10-May-18 31-Jan-19
10-May-18 31-Jan-19
10.86%
19-Feb-18 15-Sep-18 15-Sep-18
20-Mar-18 30-Sep-18 30-Sep-18
23-Mar-18 27-Dec-18
23-Mar-18 27-Dec-18
1.40%
Loss Preventation
5.1 Fire Detection System
Issue Purchase Order
Sec.
Progress Scale
3.11 PRESSURE RELIEF VALVES
Issue RFQ to Vendors
% Weight
4.00% 8.00% 6.00%
2.00%
0.68%
% Progress % Phy. Comp.
% Variance
100.00% 85.00% 85.00% 100.00% 100.00% 100.00% 100.00% 85.00% 85.00% 100.00% 100.00% 100.00% 100.00% 85.00% 85.00%
(15.00) 0.00
100.00% 100.00% 100.00%
0.00 0.00
100.00% 85.00% 85.00% 100.00% 60.00% 60.00% 100.00% 85.00% 85.00%
(15.00) 0.00
Page 84 of 170
0.00 0.00 (15.00) 0.00 0.00 0.00 (15.00) 0.00
(40.00) 0.00 (15.00) 0.00
PROJECT PLANNING PACKAGE
Attachment 9
CONSTRUCTION CONTROL REGISTER
Page 85 of 170
Attachment-6 Construction CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORSTLL DEGASSING STATIONS, DUKHAN CONSTRUCTION PROGRESS (MONITORING WEIGHTAGE):
Sr.no. Activity ID XX
1
2
3
4 5 6
9 10 12 13 14
17
18
19
Inv Code
Activity Name
FABRICATION KAHM Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR. F0010 2.40 INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER TO SITE FOR INSTLN. FAB. OF METERING SKID F0040 2.40 INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER TO SITE FOR INSTALLATION FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. F0030 2.40 STRUCTURE TRANSFER TO SITE FOR INSTALLATION FAB. OF PIPESUPPORT STRUCTURE SHIFT F0020 XX 2.40 TO SITE FAB. OF PIPESUPPORT STRUCTURE SHIFT F0020 XX 2.40 TO SITE FABRICATION OF INSTRUMENT STANCHION F0020‐1 2.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION & FBE COATINGT F0080 2.10 KUWAIT F0110 2.10 FBE PIPING BULK DELIVERT SITE REMANING PIPING (NON FBE) ETPFKM‐1 2.10 Early Tie‐in Fabrication Works COMPLETE PIPING FABRICATION INCL. F0080‐1 2.10 HYDROTEST/ PAINTING & COATING F0110‐1 2.10 FABRICATION SPOOLS DELIVER TO SITE KAHN Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR. F110 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER TO SITE FOR INSTLN. FAB. OF METERING SKID F140 XX 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTALLATION FAB. OF METERING SKID F140 XX 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTALLATION
LAST WEEK
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Current Week
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Cumulative
Plan % (Rev : 04)
Actual %
Variance
21.00%
100.00%
0.04%
0.21%
100.000%
95.00%
0.00%
3.000%
65.789%
98.000%
32.21%
FAB
KM
STFB
Kg
9298
9112.04
06‐Sep‐18
20‐Nov‐18
6‐Sep‐18
FAB
KM
STFB
Kg
4078
4078
08‐Aug‐18
15‐Oct‐18
8‐Aug‐18
15‐Oct‐18
0.04%
0.21%
100.000%
95.00%
0.00%
5.000%
100.000%
100.000%
0.00%
FAB
KM
STFB
Kg
1705
1705
09‐Aug‐18
23‐Oct‐18
15‐Jul‐18
23‐Oct‐18
0.04%
0.21%
100.000%
98.00%
0.00%
0.000%
100.000%
100.000%
0.00%
FAB
KM
STFB
Sqm
5780
5780
07‐Jun‐18
12‐Nov‐18
4‐Feb‐18
19‐Jul‐18
0.02%
0.11%
100.000%
100.00%
0.00%
0.000%
88.679%
100.000%
11.32%
FAB
KM
STFB
Sqm
1320
1280.4
07‐Jun‐18
12‐Nov‐18
7‐Jun‐18
0.04%
0.21%
100.000%
97.00%
0.00%
0.000%
88.679%
97.000%
8.32%
FAB
KM
STFB
0
13‐Aug‐18
03‐Sep‐18
20‐Jun‐18
0.04%
0.21%
100.000%
100.00%
0.00%
0.000%
100.000%
100.000%
0.00%
08‐Oct‐18
0.17%
0.80%
74.074%
12.00%
‐45.95%
8.000%
28.125%
20.000%
‐8.13%
0.06%
0.27%
0.000%
0.00%
0.00%
0.000%
0.000%
0.000%
0.00%
FAB
KM
PPFB
DIN
2677
535.4
08‐Oct‐18
10‐Dec‐18
FAB
KM
PPFB
LM
110
0
05‐Dec‐18
15‐Dec‐18
FAB
KM
PPFB
0
19‐Dec‐17
18‐Jan‐18
19‐Dec‐17
FAB
KM
PPFB
0
24‐Oct‐18
08‐Dec‐18
24‐Oct‐18
FAB
KM
PPFB
0
28‐Nov‐18
12‐Dec‐18
FAB
KN
STFB
Kg
8368.2
19‐Sep‐18
13‐Nov‐18
19‐Sep‐18
FAB
KN
STFB
Kg
4909.18 4909.175
28‐May‐18
16‐Aug‐18
28‐May‐18
FAB
KN
STFB
Kg
866.325
866.325
28‐May‐18
16‐Aug‐18
9298
27‐Jul‐18
100.00%
0.00%
0.0%
100.000%
0.22%
1.07%
91.892%
5.00%
‐87.54%
0.000%
4.348%
5.000%
0.65%
0.11%
0.53%
50.000%
0.00%
‐50.00%
0.000%
0.000%
0.000%
0.00%
0.04%
0.21%
100.000%
75.00%
0.00%
15.000%
66.071%
90.000%
23.93%
19‐Jul‐18
0.02%
0.08%
100.000%
100.00%
0.00%
0.000%
100.000%
100.000%
0.00%
28‐May‐18
20‐Aug‐18
0.04%
0.21%
100.000%
100.00%
0.00%
0.000%
100.000%
100.000%
0.00%
18‐Jan‐18
0.05%
0.23%
100.000%
100.00%
0.00%
20
F130
XX
FAB. OF PSV 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TO SITE FOR INSTALLATION
FAB
KN
STFB
Kg
6570.5
6570.5
17‐May‐18
21‐Aug‐18
17‐May‐18
19‐Jul‐18
0.02%
0.08%
100.000%
100.00%
0.00%
0.000%
100.000%
100.000%
0.00%
21
F130
XX
FAB. OF PSV 1.40 INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TO SITE FOR INSTALLATION
FAB
KN
STFB
Kg
1159.5
1159.5
17‐May‐18
21‐Aug‐18
17‐May‐18
26‐Aug‐18
0.04%
0.21%
100.000%
100.00%
0.00%
0.000%
100.000%
100.000%
0.00%
FAB
KN
STFB
Kg
7140
7140
9‐May‐18
13‐Nov‐18
5‐Feb‐18
19‐Jul‐18
0.02%
0.08%
100.000%
100.00%
0.00%
0.000%
89.947%
100.000%
10.05%
FAB
KN
STFB
Kg
1660
1643.4
09‐May‐18
13‐Nov‐18
9‐May‐18
0.04%
0.21%
100.000%
98.00%
0.00%
1.000%
89.947%
99.000%
9.05%
FAB
KN
STFB
0
15‐Aug‐18
16‐Sep‐18
26‐Jun‐18
0.04%
0.21%
100.000%
100.00%
0.00%
0.000%
100.000%
100.000%
0.00%
08‐Oct‐18
0.21%
0.99%
74.074%
12.00%
‐42.50%
8.000%
31.579%
20.000%
‐11.58%
0.07%
0.33%
0.000%
0.00%
0.000%
0.000%
0.06%
0.29%
100.000%
100.00%
0.00%
0.000%
100.000%
100.000%
0.00%
0.28%
1.31%
91.892%
5.00%
‐91.89%
0.000%
0.000%
5.000%
5.00%
0.14%
0.66%
50.000%
‐50.00%
0.000%
0.000%
0.01%
0.05%
100.000%
0.00%
0.000%
100.000%
22
23
24
27 28 30 31 32
35
COMPLETE FAB. OF PIPESUPPORT 1.40 STRUCTURE TRANSFER TO SITE FOR INSTALLATION COMPLETE FAB. OF PIPESUPPORT F120 XX 1.40 STRUCTURE TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION F120‐1 1.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION & FBE COATINGT F180 1.10 KUWAIT F210 1.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING ( NON FBE) ETPFKN‐1 1.10 Early Tie‐in Fabrication Works COMPLETE PIPING FABRICATION . F180‐1 1.10 HYDROTEST/ PAINTING & COATING F210‐1 1.10 FABRICATION SPOOLS DELIVER TO SITE KAHS Structural Steel Fabrication FAB. OF METERING SKID F250 XX 3.40 INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTALLATION F120
XX
FAB
KN
PPFB
DIN
3118
623.6
08‐Oct‐18
03‐Dec‐18
FAB
KN
PPFB
LM
147
0
01‐Dec‐18
15‐Dec‐18
FAB
KN
PPFB
0
19‐Dec‐17
19‐Jan‐18
19‐Dec‐17
FAB
KN
PPFB
0
27‐Oct‐18
03‐Dec‐18
27‐Oct‐18
FAB
KN
PPFB
0
24‐Nov‐18
08‐Dec‐18
FAB
KS
STFB
4594.25
19‐Jun‐18
26‐Aug‐18
Kg
4594.25
19‐Jun‐18
26‐Jul‐18
19‐Jan‐18
19‐Jul‐18
100.00%
0.00%
0.00%
100.000%
Page 86 of 170
0.00%
Sr.no. Activity ID XX
Inv Code
36
F250
XX
3.40
37
F230
XX
3.40
38
F230
XX
3.40
39
F220
3.40
40
F240
3.40
41
F260‐1
3.40
44 45 47 48 49
52
53
54
55 56
59 60
62 63
66
67
68
69
70
73 74
Activity Name FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTALLATION FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATION FAB. OF PIPESUPPORT STRUCTURE TRANSFER TO SITE FOR INSTALLATION FAB. OF SEPERATOR & PLATFORM STR. INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTLN. FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. STRUCTURE TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION SUPPORTS
Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION & FBE COATINGT F290 3.10 KUWAIT F320‐2 3.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING (NON ‐ FBE) SDCN100 3.10 Early Tie‐in Fabrication Works COMPLETE PIPING FABRICATION INCL. F290‐1 3.10 HYDROTEST/ PAINTING & COATING F320‐1 3.10 FABRICATION SPOOLS DELIVER TO SITE JALM Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR. F330 7.40 INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTLN. FAB. OF METERING SKID F340 7.40 INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTALLATION FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. F350 7.40 STRUCTURE TRANSFER TO SITE FOR INSTALLATION FAB. OF PIPESUPPORT STRUCTURE F360 7.40 TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION F370 7.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION & FBE COATINGT F400 7.10 KUWAIT F430 7.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING (NON FBE0 COMPLETE PIPING FABRICATION F400‐1 7.10 HYDROTEST/ PAINTING & COATING F430‐1 7.10 FABRICATION SPOOLS DELIVER TO SITE FAHS Structural Steel Fabrication COMPLETE FAB. OF SEPERATOR & PLATFORM STR. F440 6.40 INCL.LADDERS/STAIRS/HR/WW/CROS. BY PETROSERV & TRANSFER TO SITE FOR INSTLN. COMPLETE SS FAB. OF METERING SKID INCL.LADDERS/STAIRS/HR/WW/CROS. BY F450 6.40 PETROSERV & TRANSFER TO SITE FOR INSTALLATION COMPLETE FAB. OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. F460 6.40 STRUCTURE BY PETROSERV & TRANSFER TO SITE FOR INSTALLATION COMPLETE FAB. OF PIPESUPPORT F470 6.40 STRUCTURE BY PETROSERV & TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION F480 6.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION & FBE COATINGT F510 6.10 KUWAIT F540 6.10 FBE PIPING BULK DELIVERT SITE REMANING PIPING (NON FBE)
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
26‐Aug‐18
20‐Jun‐18
26‐Aug‐18
0.04%
0.20%
100.000%
100.00%
19‐Jul‐18
Actual %
Variance
100.000%
100.000%
0.00%
FAB
KS
STFB
Kg
810.75
810.75
19‐Jun‐18
FAB
KS
STFB
Kg
1620
1620
06‐Feb‐18
10‐Nov‐18
6‐Feb‐18
0.01%
0.05%
100.000%
100.00%
0.00%
0.000%
94.245%
100.000%
5.76%
FAB
KS
STFB
Kg
850
833
6‐Feb‐18
10‐Nov‐18
7‐Apr‐18
0.04%
0.20%
100.000%
98.00%
0.00%
98.000%
94.245%
98.000%
3.76%
FAB
KS
STFB
Kg
9298
8833.1
16‐Aug‐18
05‐Nov‐18
25‐Aug‐18
0.04%
0.20%
100.000%
92.00%
0.00%
95.000%
86.585%
95.000%
8.41%
FAB
KS
STFB
Kg
1705
1619.75
06‐Feb‐18
05‐Nov‐18
10‐Jul‐18
0.04%
0.20%
100.000%
92.00%
0.00%
95.000%
95.971%
95.000%
‐0.97%
FAB
KS
STFB
0
02‐Sep‐18
16‐Sep‐18
26‐Jun‐18
0.04%
0.20%
100.000%
100.00%
0.00%
100.000%
100.000%
100.000%
0.00%
08‐Oct‐18
0.20%
0.93%
58.621%
12.00%
‐27.04%
8.000%
31.579%
20.000%
‐11.58%
0.07%
0.31%
0.000%
0.00%
0.000%
0.000%
0.06%
0.27%
100.000%
100.00%
0.00%
0.000%
0.26%
1.24%
91.892%
5.00%
‐88.67%
0.000%
0.13%
0.62%
62.500%
‐62.50%
0.000%
0.000%
DIN
2945
26‐Jul‐18
0.00%
0.000%
Plan % (Rev : 04)
FAB
KS
PPFB
589
08‐Oct‐18
03‐Dec‐18
FAB
KS
PPFB
0
04‐Dec‐18
13‐Dec‐18
FAB
KS
PPFB
0
19‐Dec‐17
18‐Jan‐18
19‐Dec‐17
FAB
KS
PPFB
0
25‐Oct‐18
24‐Nov‐18
25‐Oct‐18
FAB
KS
PPFB
0
18‐Nov‐18
02‐Dec‐18
FAB
JL
STFB
Kg
9298
5578.8
11‐Sep‐18
22‐Dec‐18
11‐Sep‐18
0.09%
0.41%
100.000%
50.00%
‐56.31%
10.000%
43.689%
60.000%
16.31%
FAB
JL
STFB
Kg
2470
2173.6
11‐Sep‐18
22‐Dec‐18
11‐Sep‐18
0.01%
0.03%
100.000%
85.00%
‐56.31%
3.000%
43.689%
88.000%
44.31%
FAB
JL
STFB
Kg
1705
545.6
12‐Sep‐18
22‐Dec‐18
12‐Sep‐18
0.01%
0.06%
100.000%
25.00%
‐56.86%
7.000%
43.137%
32.000%
‐11.14%
FAB
JL
STFB
Kg
4078
1835.1
20‐Sep‐18
31‐Dec‐18
12‐Sep‐18
0.01%
0.06%
79.070%
35.00%
‐44.12%
10.000%
34.951%
45.000%
10.05%
FAB
JL
STFB
PCS
151
151
02‐Sep‐18
16‐Sep‐18
26‐Jun‐18
0.14%
0.67%
0.000%
100.00%
100.00%
0.000%
100.000%
100.000%
0.00%
11‐Oct‐18
12.00%
20.000%
‐0.55%
18‐Jan‐18
26‐Jul‐18
0.00%
100.000%
100.000%
0.00%
3.226%
5.000%
1.77%
FAB
JL
PPFB
DIN
3564
712.8
11‐Oct‐18
22‐Dec‐18
0.24%
1.14%
48.780%
‐28.23%
8.000%
20.548%
FAB
JL
PPFB
LM
170
0
23‐Dec‐18
01‐Jan‐19
0.08%
0.38%
0.000%
0.00%
0.000%
0.000%
0.00%
0.00%
FAB
JL
PPFB
0
28‐Nov‐18
05‐Jan‐19
0.32%
1.51%
65.789%
‐65.79%
5.000%
0.000%
FAB
JL
PPFB
0
26‐Dec‐18
09‐Jan‐19
0.16%
0.76%
0.000%
0.00%
0.000%
0.000%
FAB
FS
STFB
Kg
9298
6043.7
11‐Sep‐18
29‐Dec‐18
11‐Sep‐18
0.10%
0.48%
89.474%
60.00%
‐48.56%
5.000%
40.909%
65.000%
24.09%
FAB
FS
STFB
Kg
2470
2223
09‐Sep‐18
29‐Dec‐18
9‐Sep‐18
0.01%
0.05%
89.474%
85.00%
‐47.51%
5.000%
41.964%
90.000%
48.04%
FAB
FS
STFB
Kg
1705
818.4
11‐Sep‐18
10‐Dec‐18
11‐Sep‐18
0.02%
0.10%
100.000%
40.00%
‐50.55%
8.000%
49.451%
48.000%
‐1.45%
FAB
FS
STFB
Kg
4078
2039
12‐Sep‐18
19‐Dec‐18
12‐Sep‐18
0.02%
0.10%
86.207%
45.00%
‐41.76%
5.000%
44.444%
50.000%
5.56%
FAB
FS
STFB
PCS
151
151
03‐Sep‐18
16‐Sep‐18
26‐Jun‐18
0.12%
0.55%
45.000%
100.00%
55.00%
0.000%
100.000%
100.000%
0.00%
18‐Oct‐18
0.18%
0.88%
48.780%
12.00%
‐35.45%
8.000%
13.333%
20.000%
6.67%
0.06%
0.29%
0.000%
0.00%
0.000%
0.000%
FAB
FS
PPFB
DIN
2678
535.6
18‐Oct‐18
16‐Dec‐18
FAB
FS
PPFB
LM
142
0
17‐Dec‐18
25‐Dec‐18
27‐Jul‐18
5.000%
5.00% 0.00%
Page 87 of 170
0.00%
Sr.no. Activity ID XX 76
F510‐1
77
F540‐1
Inv Code
Activity Name
COMPLETE PIPING FABRICATION INCL. HYDROTEST/ PAINTING & COATING 6.10 FABRICATION SPOOLS DELIVER TO SITE 6.10
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
5.000%
5.00%
FAB
FS
PPFB
0
05‐Nov‐18
12‐Dec‐18
0.25%
1.17%
65.789%
‐65.79%
5.000%
0.000%
FAB
FS
PPFB
0
04‐Dec‐18
22‐Dec‐18
0.12%
0.59%
10.000%
‐10.00%
0.000%
0.000%
FAB
FN
STFB
Kg
9298
5578.8
10‐Sep‐18
02‐Jan‐19
10‐Sep‐18
0.12%
0.58%
89.474%
50.00%
‐49.47%
10.000%
40.000%
60.000%
20.00%
FAB
FN
STFB
Kg
2470
2223
12‐Sep‐18
02‐Jan‐19
12‐Sep‐18
0.01%
0.06%
89.474%
85.00%
‐50.54%
5.000%
38.938%
90.000%
51.06%
FAB
FN
STFB
Kg
1705
1193.5
11‐Sep‐18
19‐Dec‐18
11‐Sep‐18
0.02%
0.12%
89.474%
50.00%
‐44.47%
20.000%
45.000%
70.000%
25.00%
FAB
FN
STFB
Kg
4078
2120.56
11‐Sep‐18
02‐Jan‐19
11‐Sep‐18
0.02%
0.12%
89.474%
48.00%
‐50.00%
4.000%
39.474%
52.000%
12.53%
FAB
FN
STFB
PCS
151
151
03‐Sep‐18
11‐Oct‐18
26‐Jul‐18
0.11%
0.53%
45.000%
100.00%
55.00%
0.000%
100.000%
100.000%
0.00%
14‐Oct‐18
12.00%
20.00%
0.00%
112
FAHN Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR. F550 4.40 INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER TO SITE FOR INSTLN. FAB OF METERING SKID F560 4.40 INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTALLATION FAB OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. F570 4.40 STRUCTURE TRANSFER TO SITE FOR INSTALLATION FAB. OF PIPESUPPORT STRUCTURE F580 4.40 TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION F590 4.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION & FBE COATINGT F620 4.10 KUWAIT F650 4.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING (NON FBE) COMPLETE PIPING FABRICATION INCL. F620‐1 4.10 HYDROTEST/ PAINTING & COATING F650‐1 4.10 FABRICATION SPOOLS DELIVER TO SITE FAHM Structural Steel Fabrication FAB. OF SEPERATOR & PLATFORM STR. F660 5.40 INCL.LADDERS/STAIRS/HR/WW/CROS. TRANSFER TO SITE FOR INSTLN. FAB. OF METERING SKID F670 5.40 INCL.LADDERS/STAIRS/HR/WW/CROS TRANSFER TO SITE FOR INSTALLATION FAB.OF PSV INCL.LADDERS/STAIRS/HR/WW/CROS. F680 5.40 STRUCTURE TRANSFER TO SITE FOR INSTALLATION FAB. OF PIPESUPPORT STRUCTURE F690 5.40 TRANSFER TO SITE FOR INSTALLATION FABRICATION OF INSTRUMENT STANCHION F700 5.40 SUPPORTS Piping Fabrication FBE PIPING (AT KUWAIT) PIPING FABRICATION & FBE COATINGT F730 5.10 KUWAIT F760 5.10 FBE PIPING BULK DELIVERT SITE REMAINING PIPING (NON FBE) COMPLETE PIPING FABRICATION INCL. F730‐1 5.10 HYDROTEST/ PAINTING & COATING F760‐1 5.10 FABRICATION SPOOLS DELIVER TO SITE INSTALLATION KAHN Civil Works COMMOMN A1440 1.40 GRADING CABLE TRENCHESND UTILITY ROAD A1510 1.40 CROSSINGS A1520 1.40 DRAINAGE PIPE CULVERTS
INS
KN
CV
LM
33
33
30‐Sep‐18
16‐Oct‐18
113
A1530
1.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS
KN
CV
PCS
1
0
02‐Jan‐19
16‐Jan‐19
114
A1500
1.40
INS
KN
CV
SQM
231
0
02‐Jan‐19
16‐Jan‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
115
A1440‐1
1.40 PROTECTION OF UNDERGROUND CABLES
INS
KN
CV
0
05‐Sep‐18
21‐Nov‐18
05‐Sep‐18
0.01%
0.04%
100.000%
90.00%
‐34.62%
0.00%
65.38%
90.00%
24.62%
116
A1445‐6
1.40
SOAKWAY PIT EXCAVATION & INSTALLATION INS INCL. DEMOLITION ‐ IFPPLICABLE
KN
CV
0
14‐Aug‐18
17‐Nov‐18
14‐Aug‐18
0.01%
0.04%
100.000%
90.00%
‐23.96%
0.00%
76.04%
90.00%
13.96%
A1530‐1
RE‐INSTATEMENT OF EXISTING PAVEMENT 1.40 (INTERLOCK PAVING)
INS
KN
CV
0
02‐Jan‐19
16‐Jan‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
80
81
82
83 84
87 88
90 91
94
95
96
97 98
101 102
104 105
110 111
117
ROADSND PAVING(INCLUDING MODIFICATIONS)
FAB
FN
PPFB
DIN
2522
504.4
14‐Oct‐18
25‐Dec‐18
0.18%
0.86%
48.780%
‐32.34%
8.00%
16.44%
FAB
FN
PPFB
LM
164
0
26‐Dec‐18
05‐Jan‐19
0.06%
0.29%
0.000%
0.00%
0.00%
0.00%
3.56% 0.00%
FAB
FN
PPFB
0
19‐Nov‐18
26‐Dec‐18
0.24%
1.15%
65.789%
‐65.79%
5.00%
0.00%
FAB
FN
PPFB
0
16‐Dec‐18
03‐Jan‐19
0.12%
0.58%
0.000%
0.00%
0.00%
0.00%
FAB
FM
STFB
Kg
9298
4370.06
13‐Sep‐18
24‐Jan‐19
13‐Sep‐18
0.08%
0.39%
71.429%
40.00%
‐39.34%
7.00%
32.09%
47.00%
14.91%
FAB
FM
STFB
Kg
2470
1778.4
13‐Sep‐18
24‐Jan‐19
13‐Sep‐18
0.01%
0.04%
71.429%
30.00%
‐39.34%
42.00%
32.09%
72.00%
39.91%
FAB
FM
STFB
Kg
1705
596.75
13‐Sep‐18
09‐Jan‐19
13‐Sep‐18
0.02%
0.08%
71.429%
30.00%
‐35.29%
5.00%
36.13%
35.00%
‐1.13%
FAB
FM
STFB
Kg
4078
3140.06
12‐Sep‐18
05‐Jan‐19
12‐Sep‐18
0.02%
0.08%
62.500%
75.00%
‐24.57%
2.00%
37.93%
77.00%
39.07%
FAB
FM
STFB
PCS
151
151
03‐Sep‐18
16‐Sep‐18
3‐Sep‐18
0.11%
0.53%
0.000%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
FAB
FM
PPFB
DIN
2775
555
18‐Oct‐18
31‐Dec‐18
18‐Oct‐18
0.20%
0.93%
43.478%
12.00%
‐32.81%
8.00%
10.67%
20.00%
FAB
FM
PPFB
LM
146
0
01‐Jan‐19
10‐Jan‐19
0.07%
0.31%
0.000%
0.00%
0.00%
0.00%
16‐Sep‐18
5.00%
5.00% 0.00%
9.33% 0.00%
FAB
FM
PPFB
0
29‐Nov‐18
14‐Jan‐19
0.26%
1.25%
50.000%
‐50.00%
5.00%
0.00%
FAB
FM
PPFB
0
29‐Dec‐18
16‐Jan‐19
0.13%
0.62%
0.000%
0.00%
0.00%
0.00%
0.04%
0.18%
100.000%
100.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
0.01%
100.000%
25.00%
‐30.34%
10.00%
69.66%
35.00%
‐34.66%
0.01%
0.02%
0.000%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KN
CV
SQM
246
246
10‐Feb‐18
31‐May‐18
09‐Feb‐18
INS
KN
CV
LM
500
175
25‐Aug‐18
21‐Nov‐18
25‐Aug‐18 30‐Sep‐18
19‐Jul‐18
16‐Oct‐18
5.00%
5.00% 0.00%
TEST SEPERATOR 119
A1445
1.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
KN
CV
CUM
40
40
09-Feb-18
29-Mar-18
09-Feb-18
29-Mar-18
0.02%
0.09%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
120 121
A1450 A1450‐1
1.40 FOUNDATION WORK (STEEL FIXING) 1.40 FOUNDATION WORK (CONCRETE)
KN KN
CV CV
ton CUM
1534 15.8
1534 15.8
01-Apr-18 01-Apr-18
12-Apr-18 26-Apr-18
01-Apr-18 01-Apr-18
12-Apr-18 26-Apr-18
0.02% 0.02%
0.07% 0.07%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
INS INS
Page 88 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
122
A1450‐2
XX 1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
CUM
45
45
24-May-18
11-Aug-18
27-May-18
19-Jul-18
0.02%
0.07%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
123
A1450‐2
XX 1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
CUM
45
45
24‐May‐18
11‐Aug‐18
24-May-18
11-Aug-18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
TEST SEPERATOR PLATFORM 125
A1445‐1
1.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
KN
CV
0
09‐Feb‐18
29‐Mar‐18
09‐Feb‐18
29‐Mar‐18
0.02%
0.09%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
126 127
A1450‐3 A1450‐4
1.40 FOUNDATION WORK (STEEL FIXING) 1.40 FOUNDATION WORK (CONCRETE)
INS INS
KN KN
CV CV
0 0
01‐Apr‐18 01‐Apr‐18
16‐Jul‐18 26‐Jul‐18
01‐Apr‐18 01‐Apr‐18
16‐Jul‐18 26‐Jul‐18
0.02% 0.02%
0.07% 0.07%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
128
A1450‐5
XX 1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
0
27‐May‐18
11-Aug-18
27‐May‐18
19-Jul-18
0.02%
0.07%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
129
A1450‐5
XX 1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
0
27‐May‐18
11‐Aug‐18
27‐May‐18
11‐Aug‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
METERING SKID 131 132 133 134
A1445‐2 A1490 A1490‐1
1.40 EXCAVATION 1.40 FOUNDATION WORK (STEEL FIXING) 1.40 FOUNDATION WORK (CONCRETE)
INS INS INS
KN KN KN
CV CV CV
CUM kg CUM
60 1656 14.55
60 1656 14.55
06‐Mar‐18 01‐Apr‐18 01‐Apr‐18
29‐Mar‐18 12‐Apr‐18 26‐Apr‐18
06‐Mar‐18 01‐Apr‐18 01‐Apr‐18
29‐Mar‐18 12‐Apr‐18 26‐Apr‐18
0.04% 0.03% 0.03%
0.19% 0.15% 0.15%
100.000% 100.000% 100.000%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
A1490‐2
1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
CUM
108
108
28‐May‐18
11‐Aug‐18
28‐May‐18
11‐Aug‐18
0.03%
0.15%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS
KN
CV
CUM
78.6
78.6
22‐Mar‐18
06‐Aug‐18
22‐Mar‐18
31‐May‐18
0.04%
0.19%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS
KN
CV
CUM
78.6
78.6
22‐Mar‐18
06‐Aug‐18
22‐Mar‐18
06‐Aug‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
PIPE SUPPORT EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE) FOUNDATION WORK (CONCRETE)
136
A1445‐3
XX 1.40
137
A1445‐3
XX 1.40
138 139 140 141
A1470 A1470 A1470‐1 A1470‐1
XX XX XX XX
INS INS INS INS
KN KN KN KN
CV CV CV CV
kg kg CUM CUM
2880 2880 24 24
2880 2880 24 24
10‐Dec‐17 10‐Dec‐17 10‐Dec‐17 10‐Dec‐17
18‐Aug‐18 18‐Aug‐18 18‐Aug‐18 18‐Aug‐18
10‐Dec‐17 10‐Dec‐17 10‐Dec‐17 10‐Dec‐17
19‐Jul‐18 18‐Aug‐18 19‐Jul‐18 18‐Aug‐18
0.00% 0.00% 0.00% 0.00%
0.01% 0.00% 0.01% 0.00%
100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
142
A1470‐2
XX 1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
CUM
76
76
10‐Dec‐17
23‐Aug‐18
10‐Dec‐17
19‐Jul‐18
0.00%
0.01%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
143
A1470‐2
XX 1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
CUM
76
76
10‐Dec‐17
23‐Aug‐18
10‐Dec‐17
23‐Aug‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS
KN
CV
CUM
100
100
24‐Mar‐18
05‐Jul‐18
24‐Mar‐18
05‐Jul‐18
0.04%
0.19%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS INS
KN KN
CV CV
CUM CUM
3647 26
3647 26
15‐Apr‐18 22‐Apr‐18
08‐Aug‐18 08‐Aug‐18
15‐Apr‐18 22‐Apr‐18
08‐Aug‐18 08‐Aug‐18
0.00% 0.00%
0.00% 0.00%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
1.40 1.40 1.40 1.40
PSV EXCAVATION (INCLUDINGREA LIGHTING POLES) 1.40 FOUNDATION WORK (STEEL FIXING) 1.40 FOUNDATION WORK (CONCRETE) 1.40
145
A1445‐4
146 147
A1490‐3 A1490‐5
148
A1490‐6
XX 1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
CUM
206
206
04‐Jun‐18
11‐Aug‐18
04‐Jun‐18
19‐Jul‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
149
A1490‐6
XX 1.40 CURING / WATERPROOFING / BACK FILLING INS
KN
CV
CUM
206
206
04‐Jun‐18
11‐Aug‐18
04‐Jun‐18
11‐Aug‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
KN
STIN
Kg
9298
1394.7
02‐Oct‐18
03‐Dec‐18
02‐Oct‐18
0.09%
0.44%
100.000%
10.00%
‐61.90%
5.00%
38.10%
15.00%
‐23.10%
INS
KN
STIN
PCS
151
0
14‐Nov‐18
03‐Dec‐18
0.01%
0.04%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL OF 1.40 METERING SKID INCL. WALK WAY OR CROSS INS OVER
KN
STIN
0
04‐Oct‐18
06‐Dec‐18
04‐Oct‐18
0.02%
0.08%
100.000%
10.00%
‐65.63%
5.00%
34.38%
15.00%
‐19.38%
Structural Steel TEST SEPERATOR 152
A2360
INSTALLATION OF STRUCTURAL STEELWORK 1.40 OPERATINGNDCCESS PLATFORMS (TEST INS SEPERATOR & PLATFORM)
153
A2400
1.40
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
METERING SKID 155
A2360‐1
30‐Oct‐18
PSV 157
A2380
INSTALLATION OF PSV VALVESCCESS PLATFORMS
INS
KN
STIN
Kg
1705
255.75
10‐Oct‐18
06‐Dec‐18
10‐Oct‐18
0.01%
0.04%
100.000%
10.00%
‐72.41%
5.00%
27.59%
15.00%
‐12.59%
INSTALLATION OF STRUCTURAL STEEL PIPE 1.40 SUPPORTS & MODIFICATIONS OF EXISTINGCCESS PLATFORMS (IFPPLICABLE)
INS
KN
STIN
Kg
2470
247
11‐Oct‐18
18‐Dec‐18
11‐Oct‐18
0.00%
0.02%
100.000%
0.00%
‐78.26%
10.00%
21.74%
10.00%
‐11.74%
1.40 INSTALLATION OF INSTRUMENT STANCHION INS
KN
STIN
0
15‐Dec‐18
18‐Dec‐18
0.00%
0.02%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
1.10 INSTALLATION OF NEW TEST SEPARATOR
KN
ME
KN
PPIN
KN
1.40
PIPE SUPPORT 159
A2370
FIELD INSTRUMENT 161
A2370‐1
Mechanical 163
166 167 168 169
171
A2775
INS
Piping EARLY SHUTDOWN WORKS ‐ Pre Shutdownnd Plant Shutdown Tie‐in A5550 1.10 MOBILIZATION OF OF TEAMPPLY PTW INS SCAFFOLDING / PLATE FORM / WORK A5560 INS 1.10 PERMIT ISSUE A5570 1.10 PIPING TIE‐IN / NDT INS A5580 1.10 TIE‐IN COMPLETE / REMOVE SCAFFOLD INS PIPING ‐REMAINING A2920
1.10
PIPING INSTALLATION ON PIPE SUPPORT,PIERACK &ROUND EQUIPMENT
INS
SET
137.5
137.5
05‐Sep‐18
06‐Sep‐18
04‐Sep‐18
06‐Sep‐18
0.02%
0.10%
100.000%
100.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0
31‐Dec‐17
31‐Dec‐17
31‐Dec‐17
31‐Dec‐17
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
PPIN
PCS
150
150
31‐Dec‐17
05‐Jan‐18
31‐Dec‐17
05‐Jan‐18
0.02%
0.11%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
KN KN
PPIN PPIN
DIN PCS
90 15
90 15
09‐Feb‐18 06‐Feb‐18
14‐Feb‐18 17‐Feb‐18
09‐Feb‐18 06‐Feb‐18
14‐Feb‐18 17‐Feb‐18
0.01% 0.00%
0.07% 0.01%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
KN
PPIN
DIN
334.728
0
10‐Dec‐18
29‐Dec‐18
0.03%
0.12%
20.690%
0.00%
‐20.69%
0.00%
0.00%
0.00%
0.00%
Page 89 of 170
Sr.no. Activity ID XX 172
A2920‐1
Inv Code
Activity Name
3963‐ PHASE
1.10 INSTALLATION OF BALL VALVE & GGC VALVE INS
173
A2940
1.10
174
A2950
1.10
175
A2930
1.10
176
A2951
1.10
HYDRO‐TESTING, FLUSHING, DRAININGND PURGING TIE‐IN INLET PIPING TIE‐IN TO SEPARATOR (PARTIAL SHUTDOWN TIE‐IN) REPLACE THE SHUTVALVET POINT OF OIL‐IN TIE‐IN / INSTALL SDV
3963‐ AREA
3963‐ DISC
U.M.
KN
PPIN
INS
KN
PPIN
SET
INS
KN
PPIN
PCS
INS
KN
PPIN
DIN
INS
KN
PPIN
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
0
19‐Dec‐18
27‐Dec‐18
0.03%
0.12%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
220.8
0
26‐Dec‐18
02‐Jan‐19
0.03%
0.16%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2007.81
0
02‐Jan‐19
06‐Jan‐19
0.31%
1.48%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
334.88
0
02‐Jan‐19
06‐Jan‐19
0.05%
0.25%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PCS
32.384
0
03‐Jan‐19
06‐Jan‐19
0.01%
0.02%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
25‐Aug‐18 12‐Nov‐18 06‐Dec‐18 06‐Dec‐18 09‐Dec‐18 09‐Dec‐18 18‐Dec‐18
21‐Nov‐18 17‐Nov‐18 15‐Dec‐18 20‐Dec‐18 27‐Dec‐18 23‐Dec‐18 31‐Dec‐18
0.00% 0.01% 0.03% 0.01% 0.03% 0.01% 0.02%
0.00% 0.07% 0.16% 0.06% 0.12% 0.06% 0.09%
100.000%
0.00%
‐30.34%
35.00%
100.000% 100.000% 33.333% 40.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% ‐33.33% ‐40.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
69.66% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
35.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
‐34.66% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.000%
Electrical
178 179 180 181 182
A5990 A6000 A3290 A3280 A3310 A3280‐2 A3270
1.30 1.30 1.30 1.30 1.30 1.30 1.30
CABLE TRENCHES EARTH PIT DRILLING CABLE TRAY INSTALLATION U/G CABLE LAYING CABLE LAYING BACK FILLING OF CABLE TRENCH CABLE GLANDINGND TERMINATION
INS INS INS INS INS INS INS
KN KN KN KN KN KN KN
EL EL EL EL EL EL EL
M NO LM LM LM
500 3 301.4 170.5 165
LM
123.2
175 0 0 0 0 0 0
183
A3300
1.30 ELECTRICAL EQUIPMENTS INSTALLATION
INS
KN
EL
PCS
96.8
0
18‐Dec‐18
31‐Dec‐18
0.01%
0.07%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
184
A3320
1.30 LIGHTING FICTUREND DB INSTALLATION
INS
KN
EL
PCS
233.2
0
25‐Dec‐18
31‐Dec‐18
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
185 186 187
A3310‐1 A3330 A3340
INS INS INS
KN KN KN
EL EL EL
SET SET
44 44
0 0 0
31‐Dec‐18 05‐Jan‐19 09‐Jan‐19
05‐Jan‐19 09‐Jan‐19 12‐Jan‐19
0.00% 0.00% 0.01%
0.02% 0.02% 0.03%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
LM
36.3
0
22‐Nov‐18
12‐Dec‐18
0.02%
0.07%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
09‐Dec‐18 11‐Dec‐18 11‐Dec‐18
11‐Dec‐18 13‐Dec‐18 29‐Dec‐18
0.00% 0.00% 0.02%
0.01% 0.01% 0.07%
100.000% 41.667% 41.667%
0.00% 0.00% 0.00%
‐100.00% ‐41.67% ‐41.67%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
178
1.30 HOOK UP 1.30 ELECTRICAL TIE‐INS 1.30 ENERGIZATION Instrument & Control
25‐Aug‐18
189
A3950
1.20 CABLE TRAYND SUPPORT INSTALLATION
INS
KN
IN
189 190 190
A4790 A4870 A3980
1.20 JB SUPPORT INSTALLATION 1.20 JB INSTALLATION 1.20 INSTRUMENT CABLE LAYING
INS INS INS
KN KN KN
IN IN IN
LM
1218.8
0 0 0
191
A3970
1.20 INSTRUMENT EQUIPEMNT INSTALLATION
INS
KN
IN
SET
396
0
22‐Dec‐18
29‐Dec‐18
0.04%
0.18%
5.000%
0.00%
‐5.00%
0.00%
0.00%
0.00%
0.00%
192
A3970‐1
FIELD INSTRUMENT INSTALLATION (GAUGES INS 1.20 & TRANSMITTERS)
KN
IN
0
24‐Dec‐18
30‐Dec‐18
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
191
A3970‐11
1.20 CABLE GLANDND TERMINATION (ALONG JBs) INS
192
A3970‐21
1.20
193
A3970‐2
1.20
194
A3990
1.20
195 196 197
A3970‐3 A4860 A3980‐2
1.20 1.50 1.20
198
A3960
1.20
CABLE GLANDND TERMINATION (ALONG INSTRUMENTS) INSTALLATION OF BS & WNALYZERS ON METERING SKID DCS MODIFICATION IN CONTROL ROOM BY VENDOR INSTALLATION OF INSTRUMENT VALVE INSTALLATION OF DELUGE SS TUBEND LEAK TEST INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST
KN
IN
0
25‐Dec‐18
29‐Dec‐18
0.00%
0.01%
5.000%
0.00%
‐5.00%
0.00%
0.00%
0.00%
0.00%
INS
KN
IN
0
27‐Dec‐18
01‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KN
IN
0
29‐Dec‐18
31‐Dec‐18
0.02%
0.09%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KN
IN
0
29‐Dec‐18
07‐Jan‐19
0.02%
0.09%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS
KN KN KN
IN IN IN
SET
671
0 0 0
26‐Dec‐18 01‐Jan‐19 01‐Jan‐19
29‐Dec‐18 05‐Jan‐19 05‐Jan‐19
0.04% 0.03% 0.06%
0.18% 0.14% 0.27%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
INS
KN
IN
SET
154
0
02‐Jan‐19
06‐Jan‐19
0.08%
0.36%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS
KN KN KN KN KN
IN IN IN IN IN
0 0 0 0 0
09‐Dec‐18 11‐Dec‐18 11‐Dec‐18 11‐Dec‐18 12‐Dec‐18
12‐Dec‐18 20‐Dec‐18 15‐Dec‐18 13‐Dec‐18 15‐Dec‐18
0.00% 0.00% 0.00% 0.00% 0.00%
0.02% 0.02% 0.02% 0.02% 0.02%
100.000% 100.000% 41.667% 41.667% 5.000%
0.00% 0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% ‐41.67% ‐41.67% ‐5.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
F&G System 189 189 190 190 191
A6010 A6030 A6020 A6040 A6050
1.20 1.20 1.20 1.20 1.20
F&G SUPPORTS INSTALLATION F&G CABLE INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION
192
A6060
1.20 F&G CABLE GLANDINGND TERMINATION
INS
KN
IN
0
27‐Dec‐18
01‐Jan‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
191 192
A6070 A6080
INS INS
KN KN
IN IN
0 0
01‐Jan‐19 03‐Jan‐19
02‐Jan‐19 07‐Jan‐19
0.00% 0.00%
0.02% 0.02%
5.000% 0.000%
0.00% 0.00%
‐5.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
1.20 F&G LOOP PREPARATION 1.20 F&G LOOP TESTING Painting & Fireproofing
200
A4300
1.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS
KN
FP
SQM
206
0
15‐Dec‐18
23‐Dec‐18
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
201
A4310
1.10 PIPING PAINTINGND TOUCH‐UP
INS
KN
FP
SQM
178
0
29‐Dec‐18
06‐Jan‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
202
A4320
1.50 FIREPROOFING FOR STRUCTURAL STEEL
INS
KN
FP
SQM
1051.6
0
15‐Dec‐18
27‐Dec‐18
0.16%
0.77%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KN
DEM
PCS
8.8
0
26‐Jan‐19
29‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
DEPRESSURIZATION / ISOLATION (PIPING & INS INSTRUMENTATION)
KN
DEM
PCS
34.1
0
29‐Jan‐19
30‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Demolition Works 204
D0000
1.60 WORK PERMITPPROVED FOR DEMOLITION
205
D0010
1.60
206
D0030
1.60 APPLYNTI RUST TO FOUNDATION BOTLS
INS
KN
DEM
PCS
22
0
30‐Jan‐19
02‐Feb‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
207
D0020
1.60 COLD CUTTING INLETND OUTLET PIPING
INS
KN
DEM
PCS
77
0
02‐Feb‐19
25‐Feb‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
208
D0040
1.60 UNBOLD & REMOVE EXISTING SEPARATOR
INS
KN
DEM
PCS
132
0
25‐Feb‐19
27‐Feb‐19
0.02%
0.10%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
209
D0050
1.60
REMOVE CONCRETE FOUNDATION / GRADE INS THEREA
KN
DEM
PCS
174
0
28‐Feb‐19
13‐Mar‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
KAHM Civil Works
Page 90 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish 18‐Jul‐18
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
COMMOMN A1580
2.40 GRADING
INS
KM
CV
SQM
357.5
357.5
17‐Feb‐18
02‐Apr‐18
17‐Feb‐18
A1700
SOAKWAY PIT EXCAVATION & INSTALLATION INS 2.40 INCL. DEMOLITION ‐ IFPPLICABLE
KM
CV
PCS
123.2
117.04
04‐Aug‐18
05‐Nov‐18
215
A1650
CABLE TRENCHESND UTILITY ROAD 2.40 CROSSINGS
KM
CV
LM
700
210
25‐Sep‐18
216
A1580‐1
2.40 PROTECTION OF UNDERGROUND CABLES
INS
KM
CV
0
217 218
A1660 A1690
INS INS
KM KM
CV CV
LM
0.187
0.1496 0
219
A1640
2.40 DRAINAGE PIPE CULVERTS 2.40 PAVING&GRADING(GRAVEL FILL) ROADSND PAVING(INCLUDING 2.40 MODIFICATIONS)
220
A1670
213 214
INS
0.06%
0.26%
100.000%
100.00%
0.00%
0.00%
100.00%
100.00%
0.00%
04‐Aug‐18
0.02%
0.09%
100.000%
95.00%
0.00%
0.00%
88.30%
95.00%
6.70%
21‐Nov‐18
25‐Sep‐18
0.01%
0.06%
100.000%
12.00%
‐46.55%
18.00%
53.45%
30.00%
‐23.45%
23‐Sep‐18
21‐Nov‐18
23‐Sep‐18
0.01%
0.06%
100.000%
50.00%
‐45.00%
10.00%
55.00%
60.00%
5.00%
16‐Oct‐18 05‐Jan‐19
05‐Dec‐18 14‐Jan‐19
16‐Oct‐18
0.01% 0.01%
0.03% 0.03%
0.000% 0.000%
70.00% 0.00%
19.61% 0.00%
10.00% 0.00%
19.61% 0.00%
80.00% 0.00%
60.39% 0.00%
INS
KM
CV
SQM
60.5
0
03‐Jan‐19
14‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS
KM
CV
PCS
107.8
0
05‐Jan‐19
14‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
TEST SEPERATOR 222
A1585
2.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
KM
CV
CUM
40
40
17‐Feb‐18
02‐Apr‐18
17‐Feb‐18
02‐Apr‐18
0.02%
0.09%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
223 224
A1590 A1590‐1
2.40 FOUNDATION WORK (STEEL FIXING) 2.40 FOUNDATION WORK (CONCRETE)
INS INS
KM KM
CV CV
kg CUM
1534 15.8
1534 15.8
19‐May‐18 01‐Apr‐18
18‐Jul‐18 04‐Aug‐18
19‐May‐18 01‐Apr‐18
18‐Jul‐18 04‐Aug‐18
0.01% 0.01%
0.06% 0.06%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
225
A1590‐2
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
CUM
45
45
09‐Jul‐18
18‐Aug‐18
09‐Jul‐18
19‐Jul‐18
0.01%
0.05%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
226
A1590‐2
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
CUM
45
45
09‐Jul‐18
18‐Aug‐18
09‐Jul‐17
18‐Aug‐18
0.00%
0.01%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
TEST SEPERATOR PLATFORM 228
A1585‐1
2.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
KM
CV
0
17‐Feb‐18
02‐Apr‐18
17‐Feb‐18
02‐Apr‐18
0.02%
0.09%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
229 230
A1590‐3 A1590‐4
2.40 FOUNDATION WORK (STEEL FIXING) 2.40 FOUNDATION WORK (CONCRETE)
INS INS
KM KM
CV CV
0 0
19‐May‐18 01‐Apr‐18
18‐Jul‐18 04‐Aug‐18
19‐May‐18 01‐Apr‐18
18‐Jul‐18 04‐Aug‐18
0.01% 0.01%
0.06% 0.06%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
231
A1590‐5
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
0
09‐Jul‐18
20‐Sep‐18
09‐Jul‐18
19‐Jul‐18
0.01%
0.05%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
232
A1590‐5
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
0
09‐Jul‐18
20‐Sep‐18
09‐Jul‐18
20‐Sep‐18
0.00%
0.01%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS INS INS
KM KM KM
CV CV CV
CUM kg CUM
60 1656 14.55
60 1656 14.55
03‐Mar‐18 19‐May‐18 01‐Apr‐18
01‐Apr‐18 18‐Jul‐18 02‐Aug‐18
03‐Mar‐18 19‐May‐18 01‐Apr‐18
01‐Apr‐18 18‐Jul‐18 02‐Aug‐18
0.04% 0.03% 0.03%
0.19% 0.12% 0.12%
100.000% 100.000% 100.000%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
METERING SKID 2.40 EXCAVATION 2.40 FOUNDATION WORK (STEEL FIXING) 2.40 FOUNDATION WORK (CONCRETE)
234 235 236
A1585‐2 A1630 A1630‐1
237
A1630‐2
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
CUM
108
108
01‐Jul‐18
18‐Sep‐18
01‐Jul‐18
19‐Jul‐18
0.02%
0.11%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
238
A1630‐2
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
CUM
108
108
01‐Jul‐18
18‐Sep‐18
01‐Jul‐18
18‐Sep‐18
0.00%
0.01%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
PIPE SUPPORT EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE) FOUNDATION WORK (CONCRETE)
240
A1585‐3
INS
KM
CV
CUM
63.87
63.87
03‐Dec‐17
18‐Jul‐18
03‐Dec‐17
18‐Jul‐18
0.04%
0.19%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
241 242 243 244
A1610 A1610 A1610‐1 A1610‐1
XX XX XX XX
INS INS INS INS
KM KM KM KM
CV CV CV CV
CUM CUM CUM CUM
1455 1455 30 30
1455 1455 30 30
16‐Dec‐17 16‐Dec‐17 16‐Dec‐17 16‐Dec‐17
25‐Aug‐18 25‐Aug‐18 27‐Aug‐18 27‐Aug‐18
16‐Dec‐17 16‐Dec‐17 16‐Dec‐17 16‐Dec‐17
19‐Jul‐18 25‐Aug‐18 19‐Jul‐18 27‐Aug‐18
0.05% 0.00% 0.04% 0.00%
0.22% 0.01% 0.21% 0.02%
100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
245
A1610‐2
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
CUM
76
76
16‐Dec‐17
29‐Aug‐18
16‐Dec‐17
19‐Jul‐18
0.04%
0.19%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
246
A1610‐2
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
CUM
76
76
16‐Dec‐17
29‐Aug‐18
16‐Dec‐17
29‐Aug‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
2.40 2.40 2.40 2.40 2.40
PSV EXCAVATION (INCLUDINGREA LIGHTING POLES) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE) FOUNDATION WORK (CONCRETE)
248
A1585‐4
INS
KM
CV
CUM
100
100
17‐Feb‐18
21‐Jun‐18
17‐Mar‐18
21‐Jun‐18
0.04%
0.19%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
249 250 251 252
A1630‐3 A1630‐3 A1630‐4 A1630‐4
XX XX XX XX
INS INS INS INS
KM KM KM KM
CV CV CV CV
CUM CUM CUM CUM
3647 3647 26 26
3647 3647 26 26
20‐May‐18 20‐May‐18 20‐May‐18 20‐May‐18
25‐Aug‐18 25‐Aug‐18 26‐Aug‐18 26‐Aug‐18
20‐May‐18 20‐May‐18 18‐May‐18 18‐May‐18
19‐Jul‐18 25‐Aug‐18 19‐Jul‐18 26‐Aug‐18
0.01% 0.00% 0.01% 0.00%
0.05% 0.00% 0.05% 0.00%
100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
253
A1630‐5
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
CUM
206
206
02‐Jul‐18
13‐Sep‐18
02‐Jul‐18
19‐Jul‐18
0.01%
0.04%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
254
A1630‐5
XX 2.40 CURING / WATERPROOFING / BACK FILLING INS
KM
CV
CUM
206
206
02‐Jul‐18
13‐Sep‐18
02‐Jul‐18
13‐Sep‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
KM
STIN
Kg
9298
1394.7
14‐Oct‐18
29‐Nov‐18
14‐Oct‐18
0.10%
0.49%
100.000%
5.00%
‐74.47%
10.00%
25.53%
15.00%
‐10.53%
INS
KM
STIN
PCS
151
0
20‐Nov‐18
29‐Nov‐18
0.01%
0.04%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL OF 2.40 METERING SKID INCL. WALK WAY OR CROSS INS OVER
KM
STIN
Kg
2470
247
04‐Oct‐18
22‐Nov‐18
04‐Oct‐18
0.01%
0.03%
100.000%
10.00%
‐56.00%
0.00%
44.00%
10.00%
‐34.00%
KM
STIN
Kg
1705
0
08‐Nov‐18
17‐Nov‐18
01‐Nov‐18
0.01%
0.06%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
2.40 2.40 2.40 2.40 2.40
Structural Steel TEST SEPERATOR 257
A2420
INSTALLATION OF STRUCTURAL STEELWORK 2.40 OPERATINGNDCCESS PLATFORMS (TEST INS SEPERATOR & PLATFORM)
258
A2460
2.40
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
METERING SKID 260
A2430
PSV 262
A2440
2.40
INSTALLATION OF PSV VALVESCCESS PLATFORMS
INS
Page 91 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Kg
4078
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
PIPE SUPPORT 264
A2450
INSTALLATION OF STRUCTURAL STEEL PIPE 2.40 SUPPORTS & MODIFICATIONS OF EXISTINGCCESS PLATFORMS (IFPPLICABLE)
INS
KM
STIN
2.40 INSTALLATION OF INSTRUMENT STANCHION INS
KM
STIN
2.10 INSTALLATION OF NEW TEST SEPARATOR
KM
ME
KM
PPIN
KM
0
13‐Nov‐18
01‐Dec‐18
0.01%
0.05%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
0
25‐Nov‐18
01‐Dec‐18
0.01%
0.05%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
FIELD INSTRUMENT 266
A2450‐1
Mechanical 268
271 272 273 274
A2795
INS
Piping EARLY SHUTDOWN WORKS ‐ Pre Shutdownnd Plant Shutdown Tie‐in A5590 2.10 MOBILIZATION OF OF TEAMPPLY PTW INS SCAFFOLDING / PLATE FORM / WORK A5600 INS 2.10 PERMIT ISSUE A5610 2.10 PIPING TIE‐IN / NDT INS A5620 2.10 TIE‐IN COMPLETE / REMOVE SCAFFOLD INS PIPING ‐REMAINING PIPING INSTALLATION ON PIPE SUPPORT,PIERACK &ROUND EQUIPMENT
SET
137.5
137.5
16‐Oct‐18
18‐Oct‐18
16‐Oct‐18
18‐Oct‐18
0.02%
0.10%
100.000%
20.00%
0.00%
80.00%
100.00%
100.00%
0.00%
0
31‐Dec‐17
31‐Dec‐17
31‐Dec‐17
31‐Dec‐17
0.01%
0.06%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
PPIN
PCS
156
156
31‐Dec‐17
05‐Jan‐18
31‐Dec‐17
05‐Jan‐18
0.01%
0.06%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
KM KM
PPIN PPIN
DIN PCS
93 16
93 16
09‐Feb‐18 06‐Feb‐18
14‐Feb‐18 17‐Feb‐18
09‐Feb‐18 06‐Feb‐18
14‐Feb‐18 17‐Feb‐18
0.02% 0.00%
0.07% 0.01%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
DIN
392.6
0
29‐Nov‐18
22‐Dec‐18
0.03%
0.14%
17.857%
0.00%
‐17.86%
0.00%
0.00%
0.00%
0.00%
0
11‐Dec‐18
20‐Dec‐18
0.03%
0.14%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
276
A2970
2.10
INS
KM
PPIN
277
A2970‐1
2.10 INSTALLATION OF BALL VALVE & GGC VALVE INS
KM
PPIN
INS
KM
PPIN
SET
220
0
17‐Dec‐18
26‐Dec‐18
0.03%
0.16%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KM
PPIN
DIN
390
0
26‐Dec‐18
30‐Dec‐18
0.06%
0.29%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KM
PPIN
PCS
2000
0
26‐Dec‐18
30‐Dec‐18
0.31%
1.47%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KM
PPIN
PCS
60
0
27‐Dec‐18
30‐Dec‐18
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
25‐Sep‐18 17‐Nov‐18 25‐Nov‐18 28‐Nov‐18 10‐Dec‐18 15‐Dec‐18 15‐Dec‐18
21‐Nov‐18 20‐Nov‐18 04‐Dec‐18 13‐Dec‐18 26‐Dec‐18 27‐Dec‐18 27‐Dec‐18
0.00% 0.00% 0.01% 0.02% 0.02% 0.02% 0.02%
0.00% 0.02% 0.05% 0.11% 0.08% 0.07% 0.09%
100.000% 0.000% 100.000% 0.000% 0.000% 0.000% 0.000%
5.00% 0.00% 5.00% 0.00% 0.00% 0.00% 0.00%
‐46.55% 0.00% ‐100.00% 0.00% 0.00% 0.00% 0.00%
25.00% 0.00% ‐5.00% 0.00% 0.00% 0.00% 0.00%
53.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
30.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
‐23.45% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
278
A2990
2.10
279
A2980
2.10
280
A3000
2.10
281
A3001
2.10
HYDRO‐TESTING, FLUSHING, DRAININGND PURGING INLET PIPING TIE‐IN TO SEPARATOR (PARTIAL SHUTDOWN TIE‐IN) TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN TIE‐IN / INSTALL SDV
Electrical 283 284 283 284 285 286 287
A6090 A3440 A3380 A3370 A3400 A3370‐1 A3360
2.30 2.30 2.30 2.30 2.30 2.30 2.30
CABLE TRENCHES EARTH PIT DRILLING CABLE TRAY INSTALLATION U/G CABLE LAYING CABLE LAYING BACK FILLING OF CABLE TRENCH CABLE GLANDINGND TERMINATION
INS INS INS INS INS INS INS
KM KM KM KM KM KM KM
EL EL EL EL EL EL EL
LM NO LM LM LM
700 3 292.6 154 114.4
LM
116.6
210 0 0 0 0 0 0
288
A3390
2.30 ELECTRICAL EQUIPMENTS INSTALLATION
INS
KM
EL
PCS
92.4
0
15‐Dec‐18
27‐Dec‐18
0.01%
0.07%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
289
A3410
2.30 LIGHTING FIXTUREND DB INSTALLATION
PCS
231
0
22‐Dec‐18
27‐Dec‐18
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
290 291 292
A3400‐1 A3420 A3430
SET SET
44 44
0 0 0
29‐Dec‐18 02‐Jan‐19 07‐Jan‐19
01‐Jan‐19 06‐Jan‐19 09‐Jan‐19
0.02% 0.01% 0.01%
0.07% 0.03% 0.03%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
26‐Nov‐18 11‐Dec‐18 15‐Dec‐18 05‐Dec‐18
13‐Dec‐18 13‐Dec‐18 17‐Dec‐18 25‐Dec‐18
0.02% 0.00% 0.00% 0.02%
0.08% 0.01% 0.01% 0.08%
100.000% 100.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
INS
KM
EL
HOOK UP ELECTRICAL TIE‐INS ENERGIZATION
INS INS INS
KM KM KM
EL EL EL
CABLE TRAY/DUCT INSTALLATION JB SUPPORT INSTLLATION JB INSTALLATION INSTRUMENT CABLE LAYING
INS INS INS INS
KM KM KM KM
IN IN IN IN
LM
36.3
LM
1464.1
0 0 0 0
INS
KM
IN
SET
317.9
294 294 295 295
2.30 2.30 2.30 Instrument & Control A4000 2.20 A4590 2.20 A5350 2.20 A4030 2.20
296
A4020
2.20 INSTRUMENT EQUIPEMNT INSTALLATION
0
25‐Dec‐18
01‐Jan‐19
0.04%
0.19%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
297
A4020‐1
2.20
FIELD INSTRUMENT INSTALLATION (GAUGES INS & TRANSMITTER)
KM
IN
0
25‐Dec‐18
01‐Jan‐19
0.04%
0.19%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
296
A4020‐11
2.20 CABLE GLANDND TERMINATION (ALONG JBs) INS
297
A4020‐21
2.20
298
A4040
2.20
299
A4020‐2
2.20
300 301 302
A4020‐3 A4030‐1 A5280
2.20 2.20 2.50
303
A4010
2.20
CABLE GLANDND TERMINATION (ALONG INSTRUMENTS) DCS MODIFICATION IN CONTROL ROOM BY VENDOR INSTALLATION OF BS & WNALYZERS ON METERING SKID INSTALLATION OF INSTRUMENT VALVE SS TUBEND LEAK TEST INSTALLATION OF DELUGE INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST
KM
IN
0
30‐Dec‐18
05‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KM
IN
0
30‐Dec‐18
06‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KM
IN
0
23‐Dec‐18
01‐Jan‐19
0.02%
0.10%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KM
IN
0
30‐Dec‐18
01‐Jan‐19
0.02%
0.10%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS
KM KM KM
IN IN IN
SET
671
0 0 0
01‐Jan‐19 02‐Jan‐19 01‐Jan‐19
05‐Jan‐19 06‐Jan‐19 07‐Jan‐19
0.04% 0.06% 0.03%
0.19% 0.29% 0.15%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
INS
KM
IN
SET
154
0
07‐Jan‐19
10‐Jan‐19
0.08%
0.39%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS
KM KM KM KM KM
IN IN IN IN IN
0 0 0 0 0
10‐Dec‐18 12‐Dec‐18 15‐Dec‐18 16‐Dec‐18 17‐Dec‐18
13‐Dec‐18 16‐Dec‐18 16‐Dec‐18 25‐Dec‐18 18‐Dec‐18
0.00% 0.00% 0.00% 0.00% 0.00%
0.02% 0.02% 0.02% 0.02% 0.02%
100.000% 100.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
F&G System 294 294 295 295 296
A6100 A6110 A6130 A6120 A6140
2.50 2.50 2.50 2.50 2.50
F&G SUPPORT INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G CABLE INSTALLATION F&G JB INSTALLATION
297
A6150
2.50 F&G CABLE GLANDINGND TERMINATION
INS
KM
IN
0
31‐Dec‐18
05‐Jan‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
296 297
A6160 A6170
2.50 F&G LOOP PREPARATION 2.50 F&G LOOP TESTING
INS INS
KM KM
IN IN
0 0
05‐Jan‐19 07‐Jan‐19
06‐Jan‐19 10‐Jan‐19
0.00% 0.00%
0.02% 0.02%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
Page 92 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
305
Painting & Fireproofing A4340 2.10 PIPING PAINTINGND TOUCH‐UP
INS
KM
FP
SQM
277
0
22‐Dec‐18
29‐Dec‐18
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
306
A4350
2.50 FIREPROOFING FOR STRUCTURAL STEEL
INS
KM
FP
SQM
1180.3
0
02‐Dec‐18
20‐Dec‐18
0.18%
0.87%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
307
A4330
2.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS
KM
FP
SQM
231.3
0
28‐Nov‐18
08‐Dec‐18
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KM
DEM
PCS
8.8
0
24‐Jan‐19
27‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
DEPRESSURIZATION / ISOLATION (PIPING & INS INSTRUMENTATION)
KM
DEM
PCS
41.8
0
27‐Jan‐19
29‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Demolition Works 309
DM1000
2.60 WORK PERMITPPROVED FOR DEMOLITION
310
DM1010
2.60
311
DM1030
2.60 APPLYNTI RUST TO FOUNDATION BOTLS
INS
KM
DEM
PCS
28.6
0
29‐Jan‐19
30‐Jan‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
312
DM1020
2.60 COLD CUTTING INLETND OUTLET PIPING
INS
KM
DEM
PCS
66
0
30‐Jan‐19
23‐Feb‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
313
DM1040
2.60 UNBOLD & REMOVE EXISTING SEPARATOR
INS
KM
DEM
PCS
165
0
23‐Feb‐19
24‐Feb‐19
0.03%
0.12%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
314
DM1050
REMOVE CONCRETE FOUNDATION / GRADE INS 2.60 THEREA
KM
DEM
PCS
218
0
24‐Feb‐19
10‐Mar‐19
0.03%
0.16%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
A1710
3.40 GRADING
INS
KS
CV
SQM
286
286
10‐Feb‐18
31‐May‐18
10‐Feb‐18
0.04%
0.21%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
319
A1715‐6
SOAKWAY PIT EXCAVATION & INSTALLATION INS 3.40 INCL. DEMOLITION ‐ IFPPLICABLE
KS
CV
0
06‐Aug‐18
03‐Nov‐18
06‐Aug‐18
0.01%
0.05%
100.000%
95.00%
0.00%
98.00%
90.00%
98.00%
8.00%
320
A1780‐2
3.40 CABLE TRENCHES
INS
KS
CV
0
24‐Sep‐18
22‐Nov‐18
24‐Sep‐18
0.00%
0.00%
100.000%
20.00%
0.00%
35.00%
53.33%
35.00%
‐18.33%
321
A1710‐1
3.40 PROTECTION OF UNDERGROUND CABLES
INS
KS
CV
0
14‐Sep‐18
22‐Nov‐18
14‐Sep‐18
0.00%
0.01%
100.000%
90.00%
0.00%
90.00%
60.00%
90.00%
30.00%
322 323
A1780 A1790
INS INS
KS KS
CV CV
PCS LM
140.8 0.187
0 0
11‐Dec‐18 08‐Dec‐18
09‐Jan‐19 30‐Dec‐18
0.01% 0.01%
0.05% 0.05%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
324
A1770
3.40 UTILITY ROAD CROSSINGS 3.40 DRAINAGE PIPE CULVERTS ROADSND PAVING(INCLUDING 3.40 MODIFICATIONS)
INS
KS
CV
SQM
35.2
0
31‐Dec‐18
14‐Jan‐19
0.00%
0.00%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
325
A1800
3.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS
KS
CV
PCS
132
0
31‐Dec‐18
14‐Jan‐19
0.00%
0.00%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
326
A1800‐1
3.40
RE‐INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
KS
CV
0
30‐Dec‐18
13‐Jan‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
KAHS Civil Works COMMOMN 318
INS
19‐Jul‐18
TEST SEPERATOR 328
A1715
3.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
KS
CV
CUM
40
40
10‐Feb‐18
01‐Mar‐18
10‐Feb‐18
01‐Mar‐18
0.02%
0.08%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
329 330
A1720 A1720‐1
3.40 FOUNDATION WORK (STEEL FIXING) 3.40 FOUNDATION WORK (CONCRETE)
INS INS
KS KS
CV CV
kg CUM
1656 14.55
1656 14.55
07‐Apr‐18 07‐Apr‐18
12‐Apr‐18 26‐Apr‐18
07‐Apr‐18 07‐Apr‐18
12‐Apr‐18 26‐Apr‐18
0.01% 0.01%
0.06% 0.06%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
331
A1720‐2
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
CUM
108
108
17‐May‐18
08‐Aug‐18
17‐May‐18
16‐Jul‐18
0.01%
0.06%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
332
A1720‐2
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
CUM
108
108
17‐May‐18
08‐Aug‐18
17‐May‐18
08‐Aug‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
TEST SEPERATOR PLATFORM 334
A1715‐1
3.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
KS
CV
0
10‐Feb‐18
01‐Mar‐18
10‐Feb‐18
01‐Mar‐18
0.02%
0.08%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
335 336
A1720‐3 A1720‐4
3.40 FOUNDATION WORK (STEEL FIXING) 3.40 FOUNDATION WORK (CONCRETE)
INS INS
KS KS
CV CV
0 0
07‐Apr‐18 07‐Apr‐18
12‐Apr‐18 26‐Apr‐18
07‐Apr‐18 07‐Apr‐18
12‐Apr‐18 26‐Apr‐18
0.01% 0.01%
0.06% 0.06%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
337
A1720‐5
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
0
17‐May‐18
08‐Aug‐18
17‐May‐18
16‐Jul‐18
0.01%
0.06%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
338
A1720‐5
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
0
17‐May‐18
08‐Aug‐18
17‐May‐18
08‐Aug‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS INS INS
KS KS KS
CV CV CV
CUM kg CUM
60 1656 14.55
60 1656 14.55
10‐Feb‐18 22‐Mar‐18 18‐Mar‐18
24‐Mar‐18 12‐Apr‐18 24‐May‐18
10‐Feb‐18 22‐Mar‐18 18‐Mar‐18
24‐Mar‐18 12‐Apr‐18 24‐May‐18
0.03% 0.02% 0.02%
0.16% 0.11% 0.11%
100.000% 100.000% 100.000%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
METERING SKID 3.40 EXCAVATION 3.40 FOUNDATION WORK (STEEL FIXING) 3.40 FOUNDATION WORK (CONCRETE)
340 341 342
A1715‐2 A1760‐1 A1760
343
A1760‐2
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
CUM
108
108
15‐May‐18
08‐Aug‐18
15‐May‐18
19‐Jul‐18
0.02%
0.11%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
344
A1760‐2
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
CUM
108
108
15‐May‐18
08‐Aug‐18
15‐May‐18
08‐Aug‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
PIPE SUPPORT EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE) FOUNDATION WORK (CONCRETE)
346
A1715‐3
INS
KS
CV
CUM
72
72
25‐Dec‐17
19‐Jul‐18
10‐Feb‐18
19‐Apr‐18
0.03%
0.16%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
347 348 349 350
A1740 A1740 A1740‐1 A1740‐1
XX XX XX XX
INS INS INS INS
KS KS KS KS
CV CV CV CV
CUM CUM CUM CUM
4200 4200 35 35
4200 4200 35 35
25‐Dec‐17 25‐Dec‐17 25‐Dec‐17 25‐Dec‐17
08‐Aug‐18 08‐Aug‐18 14‐Aug‐18 14‐Aug‐18
25‐Dec‐17 25‐Dec‐17 25‐Dec‐17 25‐Dec‐17
19‐Jul‐18 08‐Aug‐18 19‐Jul‐18 14‐Aug‐18
0.03% 0.00% 0.03% 0.00%
0.15% 0.00% 0.15% 0.00%
100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
351
A1740‐2
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
CUM
150
150
25‐Dec‐17
25‐Oct‐18
25‐Dec‐17
19‐Jul‐18
0.03%
0.15%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
352
A1740‐2
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
CUM
150
150
25‐Dec‐17
25‐Oct‐18
25‐Dec‐17
0.00%
0.00%
100.000%
98.00%
0.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
0.00%
100.00% 100.00% Page 93 of 170
0.00%
3.40 3.40 3.40 3.40 3.40
PSV 354
A1715‐4
355
A1760‐5
EXCAVATION (INCLUDINGREA LIGHTING POLES) 3.40 FOUNDATION WORK (STEEL FIXING) 3.40
INS
KS
CV
CUM
100
100
05‐Mar‐18
31‐May‐18
05‐Mar‐18
31‐May‐18
0.03%
0.16%
100.000%
100.00%
0.00%
100.00%
INS
KS
CV
CUM
3647
3647
25‐Mar‐18
17‐May‐18
25‐Mar‐18
17‐May‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
Sr.no. Activity ID XX
Inv Code
Activity Name
3.40 FOUNDATION WORK (CONCRETE)
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
356
A1760‐3
INS
KS
CV
CUM
26
26
18‐Mar‐18
21‐Jun‐18
18‐Mar‐18
21‐Jun‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
357
A1760‐4
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
CUM
206
206
18‐Mar‐18
06‐Aug‐18
18‐Mar‐18
19‐Jul‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
358
A1760‐4
XX 3.40 CURING / WATERPROOFING / BACK FILLING INS
KS
CV
CUM
206
206
18‐Mar‐18
06‐Aug‐18
18‐Mar‐18
06‐Aug‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
KS
STIN
Kg
9298
929.8
27‐Sep‐18
21‐Nov‐18
27‐Sep‐18
0.09%
0.45%
100.000%
10.00%
‐48.21%
10.00%
51.79%
10.00%
‐41.79%
INS
KS
STIN
Kg
4078
0
12‐Nov‐18
21‐Nov‐18
0.01%
0.06%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL OF 3.40 METERING SKID INCL. WALK WAY OR CROSS INS OVER
KS
STIN
Kg
2470
2470
13‐Oct‐18
23‐Oct‐18
13‐Oct‐18
23‐Oct‐18
0.01%
0.03%
100.000%
70.00%
0.00%
100.00%
100.00%
100.00%
0.00%
01‐Nov‐18
0.01%
0.06%
100.000%
35.00%
0.00%
35.00%
30.00%
35.00%
5.00%
0.00%
0.02%
100.000%
10.00%
‐67.35%
20.00%
32.65%
20.00%
‐12.65%
0.00%
0.02%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
Structural Steel TEST SEPERATOR 361
A2480
INSTALLATION OF STRUCTURAL STEELWORK 3.40 OPERATINGNDCCESS PLATFORMS (TEST INS SEPERATOR & PLATFORM)
362
A2510
3.40
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
METERING SKID 364
A2490
PSV 366
A2500
INSTALLATION OF PSV VALVESCCESS PLATFORMS
INS
KS
STIN
Kg
1705
596.75
17‐Oct‐18
15‐Nov‐18
17‐Oct‐18
INSTALLATION OF STRUCTURAL STEEL PIPE 3.40 SUPPORTS & MODIFICATIONS OF EXISTINGCCESS PLATFORMS (IFPPLICABLE)
INS
KS
STIN
PCS
151
30.2
10‐Oct‐18
27‐Nov‐18
10‐Oct‐18
3.40 INSTALLATION OF INSTRUMENT STANCHION INS
KS
STIN
0
25‐Nov‐18
29‐Nov‐18
3.10 INSTALLATION OF NEW TEST SEPARATOR
KS
ME
KS
PPIN
KS
3.40
PIPE SUPPORT 368
A2520
FIELD INSTRUMENT 370
A2520‐1
Mechanical 372
375 376 377 378
A2815
INS
Piping EARLY SHUTDOWN WORKS ‐ Pre Shutdownnd Plant Shutdown Tie‐in A3061 3.10 MOBILIZATION OF OF TEAMPPLY PTW INS SCAFFOLDING / PLATE FORM / WORK A3071 INS 3.10 PERMIT ISSUE A3091 3.10 TIE‐IN COMPLETE / REMOVE SCAFFOLD INS A3081 3.10 PIPING TIE‐IN / NDT INS STATION PIPING PIPING INSTALLATION ON PIPE SUPPORT,PIERACK &ROUND EQUIPMENT
SET
137.5
137.5
09‐Aug‐18
09‐Aug‐18
09‐Aug‐18
09‐Aug‐18
0.02%
0.10%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
0
31‐Dec‐17
31‐Dec‐17
31‐Dec‐17
31‐Dec‐17
0.01%
0.05%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
PPIN
PCS
142
142
31‐Dec‐17
05‐Jan‐18
31‐Dec‐17
05‐Jan‐17
0.01%
0.05%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
KS KS
PPIN PPIN
PCS DIN
14 85
14 85
06‐Feb‐18 09‐Feb‐18
17‐Feb‐18 14‐Feb‐18
06‐Feb‐18 09‐Feb‐18
17‐Feb‐18 14‐Feb‐18
0.00% 0.01%
0.01% 0.06%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
DIN
368
0
16‐Dec‐18
05‐Jan‐19
0.03%
0.14%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
380
A3020
3.10
INS
KS
PPIN
381
A3020‐1
3.10 INSTALLATION OF BALL VALVE & GGC VALVE INS
382
A3040
KS
PPIN
0
24‐Dec‐18
02‐Jan‐19
0.03%
0.14%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KS
PPIN
SET
220.8
0
24‐Dec‐18
06‐Jan‐19
0.03%
0.16%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KS
PPIN
DIN
367.896
0
06‐Jan‐19
09‐Jan‐19
0.06%
0.27%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KS
PPIN
PCS
1752.78
0
06‐Jan‐19
09‐Jan‐19
0.27%
1.29%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KS
PPIN
PCS
60.72
0
07‐Jan‐19
09‐Jan‐19
0.01%
0.04%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS
KS KS KS KS
IN IN IN IN
LM
36.3
0 0 0 0
13‐Nov‐18 02‐Dec‐18 04‐Dec‐18 05‐Dec‐18
02‐Dec‐18 05‐Dec‐18 06‐Dec‐18 24‐Dec‐18
0.01% 0.00% 0.00% 0.01%
0.06% 0.01% 0.01% 0.06%
100.000% 100.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
SET
317.9
387 387 388 388
HYDRO‐TESTING, FLUSHING, DRAININGND PURGING INLET PIPING TIE‐IN TO SEPARATOR A3030 3.10 (PARTIAL SHUTDOWN TIE‐IN) A3050 3.10 TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN A3051 3.10 TIE‐IN / INSTALL SDV Instrument & Control A4050 3.20 CABLE TRAY/DUCT INSTALLATION A4640 3.20 JB SUPPORT INSTALLATION A4740 3.20 JB INSTALLATION A4080‐1 3.20 INSTRUMENT CABLE LAYING
389
A4070
3.20 INSTRUMENT EQUIPEMNT INSTALLATION
INS
KS
IN
0
20‐Dec‐18
26‐Dec‐18
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
390
A4080‐2
3.20
FIELD INSTRUMENT INSTALLATION (GAUGESND TRANSMITTERS)
INS
KS
IN
0
16‐Dec‐18
23‐Dec‐18
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
389
A4080‐11
3.20 CABLE GLANDND TERMINATION (ALONG JB) INS
KS
IN
0
24‐Dec‐18
03‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
390
A4080‐21
3.20
KS
IN
0
20‐Dec‐18
25‐Dec‐18
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
391
A4090
3.20
392
A4090‐1
3.20
393 394
A4090‐2 A5300
3.20 3.50
395
A4060
3.20
396
A4080
3.20
CABLE GLANDND TERMINATION (ALONG INSTRUMENT) DCS INSTALLATION IN CONTROL ROOM BY VENDOR INSTALLATION OF BS & WNALYZERS ON METERING SKID INSTALLATION OF INSTRUMENT VALVE INSTALLATION OF DELUGE INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST SS TUBEND LEAK TEST
3.40 3.30 3.30 3.30
CABLE TRENCH EARTH PIT DRILLING U/G CABLE LAYING CABLE TRAY INSTALLATION
383 384 385
3.10
INS
0.000%
INS
KS
IN
0
25‐Dec‐18
05‐Jan‐19
0.02%
0.07%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KS
IN
0
25‐Dec‐18
26‐Dec‐18
0.02%
0.07%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS
KS KS
IN IN
SET
0 0
23‐Dec‐18 01‐Jan‐19
25‐Dec‐18 08‐Jan‐19
0.03% 0.02%
0.15% 0.11%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00% 0.00%
451
INS
KS
IN
SET
0
0
05‐Jan‐19
08‐Jan‐19
0.05%
0.22%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KS
IN
LM
1056
0
01‐Jan‐19
05‐Jan‐19
0.06%
0.30%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS
KS KS KS KS
IN IN EL EL
M NO LM LM
500 3 161.7 292.6
400 0 0 0
24‐Sep‐18 08‐Nov‐18 29‐Nov‐18 22‐Nov‐18
22‐Nov‐18 12‐Nov‐18 04‐Dec‐18 01‐Dec‐18
0.00% 0.00% 0.02% 0.01%
0.00% 0.02% 0.12% 0.05%
100.000% 0.000% 100.000% 100.000%
0.00% 0.00% 0.00% 0.00%
‐46.67% 0.00% ‐100.00% ‐100.00%
80.00% 0.00% 0.00% 0.00%
53.33% 0.00% 0.00% 0.00%
80.00% 0.00% 0.00% 0.00%
26.67% 0.00% 0.00% 0.00%
Electrical 387 388 398 399
A1780‐12 A3530 A3460 A3470
Page 94 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
400 401 402
A3490 A3460‐1 A3450
3.30 CABLE LAYING 3.30 BACK FILLING OF CABLE TRENCH 3.30 CABLE GLANDINGND TERMINATION
INS INS INS
KS KS KS
EL EL EL
LM
88
LM
116.6
0 0 0
02‐Dec‐18 02‐Dec‐18 22‐Dec‐18
10‐Dec‐18 11‐Dec‐18 29‐Dec‐18
0.01% 0.02% 0.02%
0.06% 0.07% 0.09%
42.105% 53.333% 7.143%
0.00% 0.00% 0.00%
‐42.11% ‐53.33% ‐7.14%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
403
A3480
3.30 ELECTRICAL EQUIPMENTS INSTALLATION
INS
KS
EL
PCS
92.4
0
09‐Dec‐18
19‐Dec‐18
0.01%
0.07%
7.143%
0.00%
‐7.14%
0.00%
0.00%
0.00%
0.00%
404
A3500
3.30 LIGHTING FIXTUREND DB INSTALLATION
INS
KS
EL
PCS
231
0
16‐Dec‐18
24‐Dec‐18
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
405 406 407
A3510‐1 A3510 A3520
3.30 HOOK UP 3.30 ELECTRICAL TIE‐INS 3.30 ENERGIZATION
INS INS INS
KS KS KS
EL EL EL
SET SET
44 44
0 0 0
25‐Dec‐18 03‐Jan‐19 05‐Jan‐19
29‐Dec‐18 05‐Jan‐19 07‐Jan‐19
0.02% 0.01% 0.01%
0.07% 0.03% 0.03%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
INS INS INS INS INS
KS KS KS KS KS
IN IN IN IN IN
LM
36.3
SET
317.9
0 0 0 0 0
28‐Nov‐18 04‐Dec‐18 05‐Dec‐18 05‐Dec‐18 06‐Dec‐18
02‐Dec‐18 09‐Dec‐18 15‐Dec‐18 06‐Dec‐18 09‐Dec‐18
0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01%
100.000% 100.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
INS
KS
IN
0
20‐Dec‐18
25‐Dec‐18
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
KS KS
IN IN
0 0
25‐Dec‐18 31‐Dec‐18
27‐Dec‐18 05‐Jan‐19
0.00% 0.00%
0.01% 0.01%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
F&G System 387 387 388 388 389
A5920 A5930 A5910 A5940 A5950
3.50 3.50 3.50 3.50 3.50
F&G SUPPORTS INSTALLATION F&G DEVICES INSTALLATION F&G CABLE INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION
390
A5960
3.50 F&G CABLE GLANDINGND TERMINATION
389 390
A5970 A5980
INS INS
3.50 F&G LOOP PREPARATION 3.50 F&G LOOP TESTING Painting & Fireproofing
409
A4360
3.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS
KS
FP
SQM
194
0
15‐Dec‐18
27‐Dec‐18
0.03%
0.14%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
410
A4370
3.10 PIPING PAINTINGND TOUCH‐UP
INS
KS
FP
SQM
259
0
24‐Dec‐18
27‐Dec‐18
0.04%
0.19%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
411
A4380
3.50 FIREPROOFING FOR STRUCTURAL STEEL
INS
KS
FP
SQM
995.5
0
19‐Dec‐18
06‐Jan‐19
0.15%
0.73%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
KS
DEM
PCS
8.8
0
17‐Jan‐19
20‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Demolition Works DM1070
3.60 WORK PERMITPPROVED FOR DEMOLITION
414
DM1080
DEPRESSURIZATION / ISOLATION (PIPING & INS 3.60 INSTRUMENTATION)
KS
DEM
PCS
39.93
0
27‐Jan‐19
28‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
415
DM1100
3.60 APPLYNTI RUST TO FOUNDATION BOTLS
KS
DEM
PCS
19.965
0
28‐Jan‐19
30‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
416
DM1090
COLD CUTTING INLETND OUTLET PIPING 3.60 REMOVAL
INS
KS
DEM
PCS
39.93
0
28‐Jan‐19
20‐Feb‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
417
DM1110
3.60 UNBOLD & REMOVE EXISTING SEPARATOR
INS
KS
DEM
PCS
139.755
0
20‐Feb‐19
24‐Feb‐19
0.02%
0.10%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
DM1120
REMOVE CONCRETE FOUNDATION / GRADE INS 3.60 THEREA
KS
DEM
PCS
169
0
24‐Feb‐19
10‐Mar‐19
0.03%
0.12%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SQM
374
374
05‐Jun‐18
12‐Jun‐18
05‐Jun‐18
0.06%
0.28%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
0
23‐Aug‐18
21‐Nov‐18
23‐Aug‐18
0.02%
0.09%
100.000%
70.00%
‐29.67%
77.00%
70.33%
77.00%
6.67%
18‐Oct‐10
413
418
INS
JALM Civil Works COMMOMN 422
A1840
7.40 GRADING
INS
JL
CV
423
A1845‐6
7.40
SOAKWAY PIT EXCAVATION & INSTALLATION INS INCL. DEMOLITION ‐ IFPPLICABLE
JL
CV
424
A1910
7.40
CABLE TRENCHESND UTILITY ROAD CROSSINGS
INS
JL
CV
425
A1840‐1
7.40 PROTECTION OF UNDERGROUND CABLES
INS
JL
CV
426
A1920
7.40 DRAINAGE PIPE CULVERTS
INS
JL
CV
LM
427
A1936
7.40 RE‐INSTATEMENT OF EXISTINGSPHALT ROAD INS
JL
CV
428
A1930
7.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS
JL
CV
RE‐INSTATEMENT OF EXISTING PAVEMENT 7.40 (INTERLOCK PAVING) 7.40 NEW RETAINING WALLS 7.40 CONCRETE KERB
INS
JL
INS INS
JL JL
429
A1938
430 431
A1935 A1937
PCS
316.8
18‐Jul‐18
15.84
18‐Oct‐18
23‐Dec‐18
0.02%
0.09%
68.966%
0.00%
‐57.03%
5.00%
11.94%
5.00%
‐6.94%
0
04‐Dec‐18
09‐Dec‐18
0.02%
0.09%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
56.1
0
09‐Dec‐18
20‐Jan‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SQM
14.3
0
13‐Mar‐19
28‐Mar‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PCS
66
0
17‐Mar‐19
31‐Mar‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
CV
SQM
13.2
0
17‐Mar‐19
31‐Mar‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
CV CV
CUM CUM
168 235.4
0 0
13‐Mar‐19 13‐Mar‐19
28‐Mar‐19 28‐Mar‐19
0.03% 0.04%
0.14% 0.19%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
TEST SEPERATOR 433
A1845
XX 7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
JL
CV
CUM
55.33
55.33
12‐Jun‐18
09‐Aug‐18
12‐Jun‐18
18‐Jul‐18
0.03%
0.16%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
434
A1845
XX 7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
JL
CV
CUM
55.33
55.33
12‐Jun‐18
09‐Aug‐18
12‐Jun‐18
09‐Aug‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
435 436 437
A1850 A1850 A1850‐1
XX 7.40 FOUNDATION WORK (STEEL FIXING) XX 7.40 FOUNDATION WORK (STEEL FIXING) 7.40 FOUNDATION WORK (CONCRETE)
INS INS INS
JL JL JL
CV CV CV
CUM CUM CUM
1534 1534 15.8
1534 1534 15.8
10‐Jul‐18 10‐Jul‐18 13‐Aug‐18
19‐Aug‐18 19‐Aug‐18 23‐Aug‐18
10‐Jul‐18 10‐Jul‐18 13‐Aug‐18
19‐Jul‐18 19‐Aug‐18 23‐Aug‐18
0.01% 0.01% 0.01%
0.05% 0.06% 0.03%
100.000% 100.000% 100.000%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
438
A1850‐2
7.40 CURING / WATERPROOFING / BACK FILLING INS
JL
CV
CUM
45
45
26‐Aug‐18
08‐Oct‐18
26‐Aug‐18
08‐Oct‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
TEST SEPERATOR PLATFORM 440
A1845‐1
7.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
JL
CV
0
27‐Jul‐18
11‐Aug‐18
27‐Jul‐18
11‐Aug‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
441 442
A1850‐3 A1850‐4
7.40 FOUNDATION WORK (STEEL FIXING) 7.40 FOUNDATION WORK (CONCRETE)
INS INS
JL JL
CV CV
0 0
12‐Aug‐18 03‐Sep‐18
03‐Sep‐18 22‐Sep‐18
12‐Aug‐18 03‐Sep‐18
03‐Sep‐18 22‐Sep‐18
0.01% 0.01%
0.03% 0.03%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
443
A1850‐5
7.40 CURING / WATERPROOFING / BACK FILLING INS
JL
CV
0
11‐Sep‐18
25‐Sep‐18
11‐Sep‐18
25‐Sep‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
7.40 EXCAVATION / Blinidng
JL
CV
60
12‐Jun‐18
05‐Jul‐18
12‐Jun‐18
05‐Jul‐18
0.03%
0.16%
100.000%
100.00%
0.00%
100.00%
100.00% 100.00% Page 95 of 170
0.00%
METERING SKID 445
A1845‐2
INS
CUM
60
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
446 447
A1890 A1890‐1
7.40 FOUNDATION WORK (STEEL FIXING) 7.40 FOUNDATION WORK (CONCRETE)
INS INS
JL JL
CV CV
CUM CUM
1656 14.55
1656 14.55
03‐Jul‐18 09‐Jul‐18
31‐Jul‐18 05‐Aug‐18
03‐Jul‐18 09‐Jul‐18
31‐Jul‐18 05‐Aug‐18
0.02% 0.02%
0.11% 0.11%
100.000% 100.000%
100.00% 100.00%
0.00% 0.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00% 0.00%
448
A1890‐3
7.40 CURING / WATERPROOFING / BACK FILLING INS
JL
CV
CUM
108
108
08‐Aug‐18
27‐Sep‐18
08‐Aug‐18
27‐Sep‐18
0.02%
0.11%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
0.03%
0.16%
100.000%
98.00%
‐25.00%
98.00%
75.00%
98.00%
23.00%
0.01% 0.02% 0.03%
0.05% 0.10% 0.16%
100.000% 100.000% 100.000%
100.00% 80.00% 55.00%
‐27.81% ‐27.81% ‐53.06%
100.00% 84.00% 75.00%
72.19% 72.19% 46.94%
100.00% 84.00% 75.00%
27.81% 11.81% 28.06%
0.03%
0.16%
100.000%
30.00%
‐62.89%
60.00%
37.11%
60.00%
22.89%
PIPE SUPPORT 450
A1845‐3
451 452 453
A1870‐1 A1870‐1 A1870‐2
454
A1870‐3
EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS XX 7.40 FOUNDATION WORK (STEEL FIXING) XX 7.40 FOUNDATION WORK (STEEL FIXING) 7.40 FOUNDATION WORK (CONCRETE)
INS
JL
CV
CUM
50
49
03‐Aug‐18
22‐Nov‐18
03‐Aug‐18
INS INS INS
JL JL JL
CV CV CV
CUM CUM CUM
4200 4200 35
4200 3528 26.25
09‐Jul‐18 09‐Jul‐18 10‐Sep‐18
06‐Dec‐18 06‐Dec‐18 16‐Dec‐18
09‐Jul‐18 06‐Aug‐18 10‐Sep‐18
7.40 CURING / WATERPROOFING / BACK FILLING INS
JL
CV
CUM
76
45.6
20‐Sep‐18
25‐Dec‐18
20‐Sep‐18
7.40 7.40 7.40 7.40 7.40
INS INS INS INS INS
JL JL JL JL JL
CV CV CV CV CV
CUM CUM CUM CUM CUM
30 70 3647 3647 26
30 70 3647 3647 26
05‐Jun‐18 05‐Jun‐18 09‐Jul‐18 09‐Jul‐18 16‐Aug‐18
06‐Sep‐18 06‐Sep‐18 13‐Sep‐18 13‐Sep‐18 16‐Sep‐18
05‐Jun‐18 05‐Jun‐18 09‐Jul‐18 09‐Jul‐18 16‐Aug‐18
19‐Jul‐18 06‐Sep‐18 19‐Jul‐18 13‐Sep‐18 16‐Sep‐18
0.01% 0.02% 0.00% 0.00% 0.01%
0.05% 0.11% 0.01% 0.02% 0.03%
100.000% 100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00%
7.40 CURING / WATERPROOFING / BACK FILLING INS
JL
CV
CUM
206
206
03‐Sep‐18
03‐Oct‐18
03‐Sep‐18
03‐Oct‐18
0.01%
0.03%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
JL
STIN
Kg
9298
464.9
07‐Oct‐18
09‐Jan‐19
07‐Oct‐18
0.10%
0.45%
60.000%
5.00%
‐40.00%
5.00%
20.00%
5.00%
‐15.00%
INS
JL
STIN
PCS
151
0
01‐Jan‐19
09‐Jan‐19
0.02%
0.11%
18.182%
0.00%
‐18.18%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL OF 7.40 METERING SKID INCL. WALK WAY OR CROSS INS OVER
JL
STIN
Kg
2470
0
01‐Jan‐19
14‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.40
19‐Jul‐18
PSV 456 457 458 459 460
A1845‐4 A1845‐4 A1890‐4 A1890‐4 A1890‐5
461
A1890‐6
XX XX XX XX
EXCAVATION EXCAVATION FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE)
Structural Steel TEST SEPERATOR 464
A2540
INSTALLATION OF STRUCTURAL STEELWORK 7.40 OPERATINGNDCCESS PLATFORMS (TEST INS SEPERATOR & PLATFORM)
465
A2580
7.40
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
METERING SKID 467
A2550
PSV 469
A2560
INSTALLATION OF PSV VALVESCCESS PLATFORMS
INS
JL
STIN
Kg
1705
0
01‐Jan‐19
14‐Jan‐19
0.01%
0.06%
18.182%
0.00%
‐18.18%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL PIPE 7.40 SUPPORTS & MODIFICATIONS OF EXISTINGCCESS PLATFORMS (IFPPLICABLE)
INS
JL
STIN
Kg
4078
0
27‐Dec‐18
14‐Jan‐19
0.01%
0.03%
15.000%
0.00%
‐15.00%
0.00%
0.00%
0.00%
0.00%
7.40 INSTALLATION OF INSTRUMENT STANCHION INS
JL
STIN
0
10‐Jan‐19
14‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.10 INSTALLATION OF NEW TEST SEPARATOR
INS
JL
ME
137.5
10‐Sep‐18
14‐Oct‐18
0.02%
0.10%
100.000%
50.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS
JL
HTAP
0
10‐Feb‐19
12‐Feb‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
HTAP
0
12‐Feb‐19
19‐Feb‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
HTAP
0
19‐Feb‐19
28‐Feb‐19
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
HTAP
0
24‐Feb‐19
28‐Feb‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
PPIN
0
04‐Mar‐19
05‐Mar‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
PPIN
0
05‐Mar‐19
11‐Mar‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS
JL JL
PPIN PPIN
0 0
21‐Feb‐19 05‐Mar‐19
28‐Feb‐19 15‐Mar‐19
0.04% 0.01%
0.18% 0.06%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0
01‐Jan‐19
06‐Feb‐19
0.10%
0.48%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
27‐Jan‐19
05‐Feb‐19
0.05%
0.24%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
06‐Mar‐19
11‐Mar‐19
0.10%
0.48%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.40
PIPE SUPPORT 471
A2570
FIELD INSTRUMENT 473
A2570‐1
Mechanical 475
A2835
SET
137.5
10‐Sep‐18
14‐Oct‐18
Piping HOT TAPPING 478 479 480 481
483 484 485 486
MOBILIZATION OF HOT TAPPING SUB CONTRACTOR SCAFFOLDING / PLATE FORM / WORK HT1090 7.10 PERMIT ISSUE HT1100 7.10 FLARE TAPPING / NDT FLARE TAPPING COMPLETE / REMOVE HT1110 7.10 SCAFFOLD Pre Shutdownnd Plant Shutdown Tie‐in A3100‐2 7.10 MOBILIZATION OF OF TEAMPPLY PTW SCAFFOLDING / PLATE FORM / WORK A3100‐3 7.10 PERMIT ISSUE A3100‐4 7.10 PIPING TIE‐IN / NDT PRE SHUT DOWN A3100‐5 7.10 PIPING TIE‐IN / NDT SHUT DOWN PIPING ‐REMAINING HT1080
7.10
PIPING INSTALLATION ON PIPE SUPPORT,PIERACK &ROUND EQUIPMENT
488
A3070
7.10
INS
JL
PPIN
489
A3070‐1
7.10 INSTALLATION OF BALL VALVE & GGC VALVE INS
JL
PPIN
INS
JL
PPIN
INS
JL
PPIN
SET
240
0
07‐Feb‐19
20‐Feb‐19
0.05%
0.24%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
PPIN
PCS
2151.6
0
05‐Mar‐19
11‐Mar‐19
0.07%
0.34%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
PPIN
PCS
66
0
09‐Mar‐19
11‐Mar‐19
0.01%
0.05%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS
JL JL JL
EL EL EL
LM NO LM
500 3 292.6
0 0 0
25‐Nov‐18 04‐Dec‐18 10‐Jan‐19
23‐Dec‐18 10‐Dec‐18 19‐Jan‐19
0.00% 0.00% 0.01%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
490
A3080
7.10
491
A3090
7.10
492
A3100
7.10
493
A3101
7.10
INLET PIPING TIE‐IN TO SEPARATOR (PARTIAL SHUTDOWN TIE‐IN) HYDRO‐TESTING, FLUSHING, DRAININGND PURGING TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN TIE‐IN / INSTALL SDV
DIN
DIN
446
446
0.000%
Electrical 495 496 495
A6180 A6190 A3560
7.40 CABLE TRENCH 7.30 EARTH PIT DRILLING 7.30 CABLE TRAY INSTALLATION
0.00% 0.02% 0.05%
0.000% 0.000% 0.000%
Page 96 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
JL JL
3963‐ DISC
U.M.
Qty
EL EL
LM LM
275 243.1
PCS
496 497
A3550 A3580
7.30 U/G CABLE LAYING 7.30 CABLE LAYING
498
A3570
7.30 ELECTRICAL EQUIPMENTS INSTALLATION
INS
JL
EL
499 500
A3550‐1 A3540
7.30 BACK FILLING OF CABLE TRENCH 7.30 CABLE GLANDND TERMINATION
INS INS
JL JL
EL EL
501
A3590
7.30 LIGHTING FIXTUREND DB INSTALLATION
INS
JL
EL
502 503 504
A3580‐1 A3600 A3610
INS INS INS
JL JL JL
EL EL EL
7.30 HOOK UP 7.30 ELECTRICAL TIE‐INS 7.30 ENERGIZATION Instrument & Control
INS INS
3963‐ AREA
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
0 0
12‐Jan‐19 15‐Jan‐19
26‐Jan‐19 06‐Feb‐19
0.04% 0.04%
0.20% 0.18%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
83.6
0
03‐Feb‐19
16‐Feb‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
LM
116.6
0 0
26‐Jan‐19 05‐Feb‐19
09‐Feb‐19 16‐Feb‐19
0.02% 0.02%
0.07% 0.09%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
PCS
198
0
10‐Feb‐19
16‐Feb‐19
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SET SET
44 44
0 0 0
17‐Feb‐19 20‐Feb‐19 26‐Feb‐19
20‐Feb‐19 26‐Feb‐19 02‐Mar‐19
0.02% 0.01% 0.01%
0.07% 0.03% 0.03%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
LM
36.3
0
29‐Dec‐18
16‐Jan‐19
0.02%
0.08%
20.000%
0.00%
‐20.00%
0.00%
0.00%
0.00%
0.00%
16‐Jan‐19 20‐Jan‐19 12‐Jan‐19
19‐Jan‐19 22‐Jan‐19 31‐Jan‐19
0.00% 0.00% 0.02%
0.01% 0.01% 0.08%
20.000% 0.000% 0.000%
0.00% 0.00% 0.00%
‐20.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
506
A4100
7.20 CABLE TRAYND SUPPORT INSTALLATION
INS
JL
IN
506 507 507
A4540 A4880 A4130
7.20 JB SUPPORT INSTALLATION 7.20 JB INSTALLATION 7.20 INSTRUMENT CABLE LAYING
INS INS INS
JL JL JL
IN IN IN
LM
1672
0 0 0
508
A4120
7.20 INSTRUMENT EQUIPEMNT INSTALLATION
INS
JL
IN
SET
317.9
0
24‐Jan‐19
16‐Feb‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
IN
0
30‐Jan‐19
19‐Feb‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
IN
0
14‐Feb‐19
16‐Feb‐19
0.02%
0.10%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
7.20 CABLE GLANDND TERMINATION (ALONG JB) INS
JL
IN
0
31‐Jan‐19
06‐Feb‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
IN
0
19‐Feb‐19
25‐Feb‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
IN
0
20‐Feb‐19
25‐Feb‐19
0.02%
0.10%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS
JL JL JL
IN IN IN
SET
605
0 0 0
12‐Feb‐19 19‐Feb‐19 21‐Feb‐19
20‐Feb‐19 24‐Feb‐19 25‐Feb‐19
0.02% 0.06% 0.06%
0.10% 0.31% 0.31%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
INS
JL
IN
SET
154
0
25‐Feb‐19
02‐Mar‐19
0.09%
0.41%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS
JL JL JL JL JL
IN IN IN IN IN
0 0 0 0 0
12‐Jan‐19 13‐Jan‐19 15‐Jan‐19 20‐Jan‐19 22‐Jan‐19
21‐Jan‐19 16‐Jan‐19 19‐Jan‐19 21‐Jan‐19 23‐Jan‐19
0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01%
20.000% 20.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00%
‐20.00% ‐20.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
509
A4120‐1
510
A4120‐3
508
A4120‐11
FIELD INSTRUMENT INSTALLATION 7.20 (GAUGESND TRANSMITTER) INSTALLATION OF BS & WNALYZERS ON 7.20 METERING SKID
509
A4120‐21
7.20
511
A4140
7.20
512 513 514
A5310 A4120‐2 A4130‐1
7.50 7.20 7.20
515
A4110
7.20
CABLE GLANDND TERMINATION (ALONG INSTRUMENT) DCS INSTALLATION IN CONTROL ROOM BY VENDOR INSTALLATION OF DELUGE INSTALLATION OF INSTRUMENT VALVE SS TUBEND LEAK TEST INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST
F&G System 506 506 507 507 508
A6230 A6200 A6210 A6220 A6240
7.50 7.50 7.50 7.50 7.50
F&G CABLE INSTALLATION F&G SUPPORT INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION
509
A6250
7.50 F&G CABLE GLANDINGND TERMINATION
510 508
7.50 F&G LOOP PREPARATION 7.50 F&G LOOP TESTING Painting & Fireproofing
INS
JL
IN
0
21‐Feb‐19
25‐Feb‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
A6260 A6270
INS INS
JL JL
IN IN
0 0
26‐Feb‐19 27‐Feb‐19
27‐Feb‐19 02‐Mar‐19
0.00% 0.00%
0.01% 0.01%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
517
A4390
7.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS
JL
FP
SQM
203
0
06‐Feb‐19
20‐Feb‐19
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
518
A4400
7.10 PIPING PAINTINGND TOUCH‐UP
INS
JL
FP
SQM
302
0
06‐Feb‐19
20‐Feb‐19
0.05%
0.22%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
519
A4410
7.50 FIREPROOFING FOR STRUCTURAL STEEL
INS
JL
FP
SQM
1037.3
0
06‐Feb‐19
25‐Feb‐19
0.16%
0.76%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
JL
DEM
PCS
8.8
0
03‐Apr‐19
06‐Apr‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
DEPRESSURIZATION / ISOLATION (PIPING & INS INSTRUMENTATION)
JL
DEM
PCS
80.96
0
07‐Apr‐19
09‐Apr‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Demolition Works 521
DM1140
7.60 WORK PERMITPPROVED FOR DEMOLITION
522
DM1150
7.60
523
DM1170
7.60 APPLYNTI RUST TO FOUNDATION BOTLS
INS
JL
DEM
PCS
40.48
0
09‐Apr‐19
10‐Apr‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
524
DM1160
7.60 COLD CUTTING INLETND OUTLET PIPING
INS
JL
DEM
PCS
80.96
0
10‐Apr‐19
06‐May‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
525
DM1180
7.60 UNBOLD & REMOVE EXISTING SEPARATOR
INS
JL
DEM
PCS
283.36
0
06‐May‐19
08‐May‐19
0.04%
0.21%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
526
DM1190
7.60
REMOVE CONCRETE FOUNDATION / GRADE INS THEREA
JL
DEM
PCS
333
0
08‐May‐19
26‐May‐19
0.05%
0.25%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SQM
239.8
239.8
08‐Apr‐18
14‐Apr‐18
08‐Apr‐18
0.04%
0.17%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
0
10‐Sep‐18
10‐Dec‐18
10‐Sep‐18
0.00%
0.00%
100.000%
90.00%
0.00%
90.00%
50.00%
90.00%
40.00%
166.32
10‐Sep‐18
10‐Dec‐18
10‐Sep‐18
0.03%
0.14%
100.000%
35.00%
0.00%
45.00%
50.00%
45.00%
‐5.00%
0
05‐Sep‐18
10‐Dec‐18
05‐Sep‐18
0.03%
0.14%
100.000%
55.00%
0.00%
65.00%
52.58%
65.00%
12.42%
0.00%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
FAHS Civil Works COMMOMN 530
A1960
6.40 GRADING
INS
FS
CV
531
A1960‐1
6.40 PROTECTION OF UNDERGROUND CABLES
INS
FS
CV
532
A2030
6.40
CABLE TRENCHESND UTILITY ROAD CROSSINGS
INS
FS
CV
533
A1965‐5
SOAKWAY PIT EXCAVATION & INSTALLATION INS 6.40 INCL. DEMOLITION ‐ IFPPLICABLE
FS
CV
534
A2040
INS
FS
CV
LM
4.95
0
11‐Dec‐18
21‐Jan‐19
0.00%
535
A2020
INS
FS
CV
SQM
57.75
0
04‐Apr‐19
20‐Apr‐19
0.01%
6.40 DRAINAGE PIPE CULVERTS ROADSND PAVING(INCLUDING 6.40 MODIFICATIONS)
PCS
369.6
14‐Apr‐18
Page 97 of 170
Sr.no. Activity ID XX 536 537
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
A2050
6.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS
FS
CV
PCS
66
0
18‐Apr‐19
02‐May‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
A2080
RE‐INSTATEMENT OF EXISTING PAVEMENT 6.40 (INTERLOCK PAVING)
FS
CV
SQM
25.85
0
02‐May‐19
16‐May‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
TEST SEPERATOR 539
A1965
FS
CV
CUM
40
40
08‐Apr‐18
04‐May‐18
08‐Apr‐18
04‐May‐18
0.04%
0.17%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
540 541 542
A1970 A1970‐1 A1970‐1
6.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS 6.40 FOUNDATION WORK (STEEL FIXING) XX 6.40 FOUNDATION WORK (CONCRETE) XX 6.40 FOUNDATION WORK (CONCRETE)
INS INS INS
FS FS FS
CV CV CV
CUM CUM CUM
1534 15.8 15.8
1534 15.8 15.8
02‐Jun‐18 02‐Jun‐18 02‐Jun‐18
05‐Jul‐18 19‐Jul‐18 19‐Jul‐18
02‐Jun‐18 02‐Jun‐18 02‐Jun‐18
05‐Jul‐18 19‐Jul‐18 20‐Jul‐18
0.03% 0.03% 0.00%
0.13% 0.12% 0.02%
100.000% 100.000% 100.000%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
100.00% 100.00% 100.00%
0.00% 0.00% 0.00%
543
A1970‐2
XX 6.40 CURING / WATERPROOFING / BACK FILLING INS
FS
CV
CUM
45
45
19‐Jul‐18
13‐Sep‐18
19‐Jul‐18
19‐Jul‐18
0.01%
0.04%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
544
A1970‐2
XX 6.40 CURING / WATERPROOFING / BACK FILLING INS
FS
CV
CUM
45
45
19‐Jul‐18
13‐Sep‐18
19‐Jul‐18
13‐Sep‐18
0.00%
0.02%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
09‐Oct‐18
TEST SEPERATOR PLATFORM 546
A1965‐1
6.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
FS
CV
0
01‐Aug‐18
09‐Oct‐18
01‐Aug‐18
0.00%
0.02%
100.000%
95.00%
0.00%
100.00%
100.00%
100.00%
0.00%
547 548
A1970‐3 A1970‐4
6.40 FOUNDATION WORK (STEEL FIXING) 6.40 FOUNDATION WORK (CONCRETE)
INS INS
FS FS
CV CV
0 0
22‐Aug‐18 03‐Sep‐18
06‐Dec‐18 16‐Dec‐18
22‐Aug‐18 03‐Sep‐18
0.00% 0.00%
0.02% 0.02%
100.000% 100.000%
90.00% 45.00%
0.00% 0.00%
97.00% 75.00%
60.75% 50.48%
97.00% 75.00%
36.25% 24.52%
549
A1970‐5
6.40 CURING / WATERPROOFING / BACK FILLING INS
FS
CV
0
16‐Sep‐18
25‐Dec‐18
16‐Sep‐18
0.00%
0.02%
100.000%
25.00%
0.00%
60.00%
39.60%
60.00%
20.40%
A2010‐1
6.40 6.40 6.40 6.40 6.40
INS INS INS INS INS
FS FS FS FS FS
CV CV CV CV CV
CUM CUM CUM CUM CUM
62.91 62.91 1656 1656 14.55
62.91 62.91 1656 1656 14.55
14‐Apr‐18 14‐Apr‐18 09‐Jul‐18 09‐Jul‐18 15‐Aug‐18
21‐Jul‐18 21‐Jul‐18 10‐Sep‐18 10‐Sep‐18 24‐Sep‐18
14‐Apr‐18 14‐Apr‐18 09‐Jul‐18 09‐Jul‐18 15‐Aug‐18
0.04% 0.02% 0.01% 0.02% 0.02%
0.17% 0.09% 0.04% 0.08% 0.09%
100.000% 100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00% 0.00%
A2010‐2
6.40 CURING / WATERPROOFING / BACK FILLING INS
FS
CV
CUM
108
97.2
11‐Sep‐18
01‐Dec‐18
11‐Sep‐18
0.02%
0.09%
100.000%
65.00%
0.00%
90.00%
54.88%
90.00%
35.12%
FS
CV
CUM
50
50
18‐Jul‐18
24‐Nov‐18
18‐Jul‐18
0.00%
0.00%
100.000%
100.00%
‐23.08%
100.00%
76.92%
100.00%
23.08%
0.03%
0.17%
100.000%
88.00%
0.00%
95.00%
76.92%
95.00%
18.08%
0.02% 0.02% 0.04%
0.12% 0.08% 0.19%
100.000% 100.000% 100.000%
100.00% 30.00% 10.00%
‐49.40% ‐49.40% ‐63.89%
100.00% 65.00% 33.00%
50.60% 50.60% 36.11%
100.00% 65.00% 33.00%
49.40% 14.40% ‐3.11%
0.04%
0.19%
100.000%
10.00%
‐66.67%
33.00%
33.33%
33.00%
‐0.33%
0.04% 0.01% 0.00% 0.00% 0.01%
0.17% 0.03% 0.02% 0.01% 0.03%
100.000% 100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 95.00% 100.00% 90.00%
0.00% ‐12.80% ‐12.80% ‐24.14% ‐24.14%
100.00% 100.00% 95.00% 100.00% 90.00%
100.00% 87.20% 87.20% 75.86% 75.86%
100.00% 100.00% 95.00% 100.00% 90.00%
0.00% 12.80% 7.80% 24.14% 14.14%
0.01%
0.04%
100.000%
90.00%
‐50.52%
90.00%
49.48%
90.00%
40.52%
551 552 553 554 555 556
METERING SKID A1965‐2 XX A1965‐2 XX A2010 XX A2010 XX
EXCAVATION EXCAVATION FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE)
21‐Jun‐18 21‐Jul‐17 19‐Jul‐18 10‐Sep‐18 24‐Sep‐18
PIPE SUPPORT 558
A1965‐3
XX 6.40
559
A1965‐3
XX 6.40
560 561 562
A1990 A1990 A1990‐1
XX 6.40 XX 6.40 6.40
563
A1990‐2
EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS EXCAVATION FOR STRUCTURAL STEEL PIPE SUPPORTS FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE)
INS
19‐Jul‐18
INS
FS
CV
CUM
50
47.5
18‐Jul‐18
24‐Nov‐18
18‐Jul‐18
INS INS INS
FS FS FS
CV CV CV
CUM CUM CUM
4200 4200 35
4200 2730 11.55
14‐Sep‐18 14‐Sep‐18 30‐Sep‐18
05‐Dec‐18 05‐Dec‐18 10‐Dec‐18
10‐Jun‐18 14‐Sep‐18 30‐Sep‐18
6.40 CURING / WATERPROOFING / BACK FILLING INS
FS
CV
CUM
76
25.08
03‐Oct‐18
10‐Dec‐18
03‐Oct‐18
6.40 6.40 6.40 6.40 6.40
INS INS INS INS INS
FS FS FS FS FS
CV CV CV CV CV
CUM CUM CUM CUM CUM
100 3647 3647 26 26
100 3647 3464.65 26 23.4
21‐May‐18 05‐Jun‐18 05‐Jun‐18 08‐Jul‐18 08‐Jul‐18
08‐Aug‐18 15‐Nov‐18 15‐Nov‐18 29‐Nov‐18 29‐Nov‐18
21‐May‐18 05‐Jun‐18 05‐Jun‐18 08‐Jul‐18 08‐Jul‐18
6.40 CURING / WATERPROOFING / BACK FILLING INS
FS
CV
CUM
206
185.4
08‐Sep‐18
13‐Dec‐18
08‐Sep‐18
FS
STIN
Kg
9298
0
30‐Dec‐18
17‐Jan‐19
0.11%
0.51%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FS
STIN
PCS
151
0
08‐Jan‐19
17‐Jan‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL OF 6.40 METERING SKID INCL. WALK WAY OR CROSS INS OVER
FS
STIN
Kg
2470
0
31‐Dec‐18
20‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
19‐Jul‐18
PSV 565 566 567 568 569
A1965‐4 A2010‐3 A2010‐3 A2010‐4 A2010‐4
570
A2010‐5
XX XX XX XX
EXCAVATION FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE) FOUNDATION WORK (CONCRETE)
08‐Aug‐18 19‐Jul‐18 28‐Oct‐18 19‐Jul‐18 31‐Oct‐18
Structural Steel TEST SEPERATOR 573
A2600
INSTALLATION OF STRUCTURAL STEELWORK 6.40 OPERATINGNDCCESS PLATFORMS (TEST INS SEPERATOR & PLATFORM)
574
A2640
6.40
INSTALLATION OF LADDERS, STAIRS, HANDRAILS
METERING SKID 576
A2610
PSV 578
A2620
INSTALLATION OF PSV VALVESCCESS PLATFORMS
INS
FS
STIN
Kg
1705
0
16‐Dec‐18
24‐Dec‐18
0.01%
0.07%
18.182%
0.00%
‐18.18%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL PIPE 6.40 SUPPORTS & MODIFICATIONS OF EXISTINGCCESS PLATFORMS (IFPPLICABLE)
INS
FS
STIN
Kg
4078
0
20‐Dec‐18
21‐Jan‐19
0.01%
0.03%
10.000%
0.00%
‐10.00%
0.00%
0.00%
0.00%
0.00%
6.40 INSTALLATION OF INSTRUMENT STANCHION INS
FS
STIN
0
28‐Jan‐19
02‐Feb‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6.10 INSTALLATION OF NEW TEST SEPARATOR
INS
FS
ME
137.5
06‐Oct‐18
08‐Oct‐18
0.02%
0.10%
100.000%
0.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS
FS
HTAP
0
28‐Feb‐19
03‐Mar‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6.40
PIPE SUPPORT 580
A2630
FIELD INSTRUMENT 582
A2630‐1
Mechanical 584
A2855
SET
137.5
06‐Oct‐18
08‐Oct‐18
Piping HOT TAPPING 587
HT1120
6.10
MOBILIZATION OF HOT TAPPING SUB CONTRACTOR
Page 98 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
588
HT1130
FS
HTAP
0
03‐Mar‐19
12‐Mar‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
HT1140
SCAFFOLDING / PLATE FORM / WORK PERMIT ISSUE 6.10 FLARE TIE‐IN / NDT
INS
589
INS
FS
HTAP
0
13‐Mar‐19
27‐Mar‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
590
HT1150
6.10 HOT TIE‐IN COMPLETE / REMOVE SCAFFOLD INS
FS
HTAP
0
09‐Apr‐19
22‐Apr‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS
FS FS
PPIN PPIN
0 0
30‐Mar‐19 30‐Mar‐19
30‐Mar‐19 15‐Apr‐19
0.01% 0.01%
0.03% 0.03%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
INS
FS
PPIN
0
31‐Mar‐19
08‐Apr‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FS
PPIN
0
15‐Apr‐19
22‐Apr‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
23‐Dec‐18
03‐Feb‐19
0.07%
0.34%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
15‐Jan‐19
24‐Jan‐19
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
240
0
29‐Jan‐19
12‐Feb‐19
0.07%
0.34%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
592 593 594 595
6.10
Pre Shutdownnd Plant Shutdown Tie‐in A3150‐000 6.10 MOBILIZATION OF OF TEAMPPLY PTW A3150‐1 6.10 PIPING TIE‐IN / NDT PRE SHUT DOWN SCAFFOLDING / PLATE FORM / WORK A3150‐00 6.10 PERMIT ISSUE A3150‐2 6.10 PIPING TIE‐IN / NDT SHUT DOWN PIPING ‐REMAINING PIPING INSTALLATION ON PIPE SUPPORT,PIERACK &ROUND EQUIPMENT
597
A3120
6.10
INS
FS
PPIN
598
A3120‐1
6.10 INSTALLATION OF BALL VALVE & GGC VALVE INS
FS
PPIN
599
A3140
6.10
INS
FS
PPIN
SET
600
A3130
6.10
INS
FS
PPIN
DIN
335
0
29‐Jan‐19
03‐Feb‐19
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
601
A3150
6.10
INS
FS
PPIN
PCS
1412.4
0
29‐Jan‐19
03‐Feb‐19
0.05%
0.24%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
602
A3151
6.10
INS
FS
PPIN
PCS
66
0
31‐Jan‐19
03‐Feb‐19
0.01%
0.05%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS INS INS
FS FS FS FS FS FS FS
EL EL EL EL EL EL EL
LM NO LM LM
500 3 301.4 319
LM LM
259.6 123.2
0 0 0 0 0 0 0
10‐Sep‐18 20‐Dec‐18 20‐Dec‐18 03‐Jan‐19 10‐Jan‐19 23‐Dec‐18 30‐Dec‐18
10‐Dec‐18 24‐Dec‐18 08‐Jan‐19 10‐Jan‐19 27‐Jan‐19 08‐Jan‐19 12‐Jan‐19
0.00% 0.00% 0.01% 0.05% 0.02% 0.04% 0.02%
0.00% 0.02% 0.05% 0.23% 0.07% 0.19% 0.09%
100.000% 40.000% 100.000% 40.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
‐50.00% ‐40.00% ‐100.00% ‐40.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
50.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
‐50.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
EL
PCS
110
0
30‐Dec‐18
12‐Jan‐19
0.02%
0.08%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
PCS
253
0
05‐Jan‐19
12‐Jan‐19
0.04%
0.19%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SET SET
44 44
0 0 0
12‐Jan‐19 16‐Jan‐19 17‐Jan‐19
16‐Jan‐19 17‐Jan‐19 21‐Jan‐19
0.02% 0.01% 0.01%
0.07% 0.03% 0.03%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
LM
36.3
LM
1117.6
0 0 0 0
05‐Jan‐19 17‐Jan‐19 22‐Jan‐19 17‐Jan‐19
21‐Jan‐19 21‐Jan‐19 26‐Jan‐19 05‐Feb‐19
0.01% 0.00% 0.00% 0.01%
0.06% 0.01% 0.01% 0.06%
0.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0
27‐Jan‐19
31‐Jan‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
HYDRO‐TESTING, FLUSHING, DRAININGND PURGING INLET PIPING TIE‐IN TO SEPARATOR (PARTIAL SHUTDOWN TIE‐IN) TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN TIE‐IN / INSTALL SDV
DIN
335
0.000%
Electrical 604 605 604 605 606 607 608
A6520 A3920 A3650 A3640 A3640‐1 A3670 A3630
6.40 6.30 6.30 6.30 6.30 6.30 6.30
CABLE TRENCH EARTH PIT DRILLING CABLE TRAY INSTALLATION U/G CABLE LAYING BACK FILLING OF CABLE TRENCH CABLE LAYING CABLE GLADND TERMINATION
609
A3660
6.30 ELECTRICAL EQUIPMENTS INSTALLATION
INS
FS
610
A3680
6.30 LIGHTING FIXTUREND DB INSTALLATION
611 612 613
A3670‐1 A3690 A3700
INS
FS
EL
HOOK UP ELECTRICAL TIE‐INS ENERGIZATION
INS INS INS
FS FS FS
EL EL EL
CABLE TRAY/DUCT INSTALLATION JB SUPPORT INSTALLATION JB INSTALLATION INSTRUMENT CABLE LAYING
INS INS INS INS
FS FS FS FS
IN IN IN IN
FS
IN
615 615 616 616
6.30 6.30 6.30 Instrument & Control A4150 6.20 A3710 6.20 A3810 6.20 A4180 6.20
617
A3900
6.20 CABLE GLANDND TERMINATION (ALONG JB) INS
617
A4170
6.20 INSTRUMENT EQUIPEMNT INSTALLATION
618
A4170‐2
6.20
619
A4170‐3
6.20
618
A3910
6.20
620
A4190
6.20
621 622
A4170‐1 A5320
6.20 6.50
623
A4160
6.20
624
A4180‐1
INS
FS
IN
0
02‐Feb‐19
20‐Feb‐19
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FS
IN
0
02‐Feb‐19
20‐Feb‐19
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FS
IN
0
18‐Feb‐19
20‐Feb‐19
0.02%
0.08%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FS
IN
0
20‐Feb‐19
25‐Feb‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
6.20
FIELD INSTRUMENT INSTALLATION (GAUGESND TRANSMITTER) INSTALLATION OF BS & WNALYZERS ON METERING SKID CABLE GLANDND TERMINATION (ALONG INSTRUMENTS) DCS MODIFICATIOM IN CONTROL ROOM BY VENDOR INSTALLATION OF INSTRUMENT VALVE INSTALLATION OF DELUGE INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST SS TUBEND LEAK TEST
INS
F&G SUPPORT INSTALLATION F&G CABLE INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION
INS INS INS INS INS
FS FS FS FS FS
SET
306.9
INS
FS
IN
0
24‐Feb‐19
02‐Mar‐19
0.02%
0.08%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS
FS FS
IN IN
SET
451
0 0
14‐Feb‐19 16‐Feb‐19
20‐Feb‐19 20‐Feb‐19
0.03% 0.02%
0.15% 0.11%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
FS
IN
SET
147.4
0
05‐Mar‐19
11‐Mar‐19
0.05%
0.23%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
FS
IN
0
02‐Mar‐19
05‐Mar‐19
0.06%
0.30%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
IN IN IN IN IN
0 0 0 0 0
17‐Jan‐19 17‐Jan‐19 21‐Jan‐19 22‐Jan‐19 27‐Jan‐19
21‐Jan‐19 27‐Jan‐19 24‐Jan‐19 23‐Jan‐19 28‐Jan‐19
0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01%
0.000% 0.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
F&G System 615 615 616 616 617
A6290 A6280 A6300 A6310 A6320
6.50 6.50 6.50 6.50 6.50
617
A6330
6.50 F&G CABLE GLANDINGND TERMINATION
618 619
A6340 A6350
INS
FS
IN
0
20‐Feb‐19
25‐Feb‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS
FS FS
IN IN
0 0
25‐Feb‐19 03‐Mar‐19
27‐Feb‐19 05‐Mar‐19
0.00% 0.00%
0.01% 0.01%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
626
6.50 F&G LOOP PREPARATION 6.50 F&G LOOP TESTING Painting & Fireproofing A4430 6.10 PIPING PAINTINGND TOUCH‐UP
INS
FS
FP
SQM
241
0
29‐Jan‐19
12‐Feb‐19
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
627
A4440
6.50 FIREPROOFING FOR STRUCTURAL STEEL
INS
FS
FP
SQM
1146.2
0
02‐Feb‐19
02‐Mar‐19
0.18%
0.84%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
628
A4420
6.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS
FS
FP
SQM
237
0
27‐Jan‐19
09‐Feb‐19
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Demolition Works
Page 99 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
DM1210
6.60 WORK PERMITPPROVED FOR DEMOLITION
INS
FS
DEM
PCS
8.8
0
18‐May‐19
20‐May‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
631
DM1220
DEPRESSURIZATION / ISOLATION (PIPING & INS 6.60 INSTRUMENTATION)
FS
DEM
PCS
47.52
0
21‐May‐19
22‐May‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
632
DM1240
6.60 APPLYNTI RUST TO FOUNDATION BOTLS
INS
FS
DEM
PCS
23.76
0
22‐May‐19
23‐May‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
633
DM1230
6.60 COLD CUTTING INLETND OUTLET PIPING
INS
FS
DEM
PCS
47.52
0
23‐May‐19
16‐Jun‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
634
DM1250
6.60 UNBOLD & REMOVE EXISTING SEPARATOR
INS
FS
DEM
PCS
166.32
0
16‐Jun‐19
18‐Jun‐19
0.03%
0.12%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
635
DM1260
6.60
REMOVE CONCRETE FOUNDATION / GRADE INS THEREA
FS
DEM
PCS
199
0
18‐Jun‐19
01‐Jul‐19
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SQM
338.8
630
FAHN Civil Works COMMOMN 639
A2090
4.40 GRADING
INS
FN
CV
338.8
05‐May‐18
10‐May‐18
05‐May‐18
0.05%
0.24%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
640
A2090‐1
4.40 PROTECTION OF UNDERGROUND CABLES
INS
FN
CV
0
13‐Aug‐18
24‐Dec‐18
13‐Aug‐18
10‐May‐18
0.00%
0.00%
0.000%
80.00%
55.22%
80.00%
55.22%
80.00%
24.78%
641
A2095‐00
4.40
SOAKWAY PIT EXCAVATION & INSTALLATION INS INCL. DEMOLITION ‐ IFPPLICABLE
FN
CV
0
18‐Sep‐18
07‐Nov‐18
12‐Sep‐18
0.01%
0.05%
100.000%
50.00%
‐25.49%
55.00%
74.51%
55.00%
‐19.51%
642 643
A2160‐1 A2170
INS INS
FN FN
CV CV
LM
4.587
0 0
08‐Nov‐18 25‐Dec‐18
24‐Dec‐18 06‐Jan‐19
0.01% 0.00%
0.05% 0.00%
42.857% 0.000%
0.00% 0.00%
‐42.86% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
644
A2200
INS
FN
CV
SQM
178.75
0
13‐Apr‐19
28‐Apr‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
645
A2150
INS
FN
CV
SQM
0
0
13‐Apr‐19
28‐Apr‐19
0.01%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
646
A2160
4.40 CABLE TRENCHES 4.40 DRAINAGE PIPE CULVERTS RE‐INSTATEMENT OF EXISTING PAVEMENT 4.40 (INTERLOCK PAVING) ROADSND PAVING(INCLUDING 4.40 MODIFICATIONS) 4.40 UTILITY ROAD CROSSINGS
INS
FN
CV
PCS
211.2
0
16‐Apr‐19
05‐May‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
647
A2180
4.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS
FN
CV
PCS
66
0
21‐Apr‐19
05‐May‐19
0.01%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
FN
CV
CUM
40
40
05‐May‐18
04‐Aug‐18
05‐May‐18
05‐Jul‐18
0.04%
0.18%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
TEST SEPERATOR 649
A2095
XX 4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
650
A2095
XX 4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
FN
CV
CUM
40
40
05‐May‐18
04‐Aug‐18
05‐May‐18
04‐Aug‐18
0.00%
0.02%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
651 652 653 654
A2100 A2100 A2100‐1 A2100‐1
XX XX XX XX
INS INS INS INS
FN FN FN FN
CV CV CV CV
CUM CUM CUM CUM
1534 1534 15.8 15.8
1534 1534 15.8 15.8
03‐Jul‐18 03‐Jul‐18 17‐Jul‐18 17‐Jul‐18
16‐Aug‐18 16‐Aug‐18 23‐Aug‐18 23‐Aug‐18
03‐Jul‐18 03‐Jul‐18 17‐Jul‐18 17‐Jul‐18
19‐Jul‐18 16‐Aug‐18 17‐Jul‐18 23‐Aug‐18
0.02% 0.00% 0.01% 0.00%
0.12% 0.02% 0.06% 0.02%
100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 0.00%
655
A2100‐3
4.40 CURING / WATERPROOFING / BACK FILLING INS
FN
CV
CUM
45
45
05‐Aug‐18
09‐Sep‐18
05‐Aug‐18
09‐Sep‐18
0.00%
0.02%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
4.40 4.40 4.40 4.40
FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE) FOUNDATION WORK (CONCRETE)
TEST SEPERATOR PLATFORM 657
A2095‐1
4.40 EXCAVATION FOR THE MAIN FOUNDATIONS INS
FN
CV
0
28‐Aug‐18
26‐Nov‐18
28‐Aug‐18
0.01%
0.03%
100.000%
50.00%
‐35.16%
84.00%
64.84%
84.00%
19.16%
658 659
A2100‐4 A2100‐5
4.40 FOUNDATION WORK (STEEL FIXING) 4.40 FOUNDATION WORK (CONCRETE)
INS INS
FN FN
CV CV
0 0
10‐Oct‐18 22‐Nov‐18
03‐Dec‐18 12‐Dec‐18
10‐Oct‐18
0.01% 0.01%
0.03% 0.03%
100.000% 100.000%
0.00% 0.00%
‐70.91% ‐100.00%
60.00% 0.00%
29.09% 0.00%
60.00% 0.00%
30.91% 0.00%
660
A2140‐125
4.40 CURING / WATERPROOFING / BACK FILLING INS
FN
CV
0
03‐Dec‐18
31‐Dec‐18
0.01%
0.03%
40.000%
0.00%
‐40.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS
FN FN FN FN
CV CV CV CV
CUM CUM CUM CUM
60 1656 1656 14.55
60 1656 1656 14.55
05‐May‐18 04‐Jul‐18 04‐Jul‐18 28‐Aug‐18
07‐Aug‐18 05‐Sep‐18 05‐Sep‐18 28‐Oct‐18
05‐May‐18 04‐Jul‐18 04‐Jul‐18 28‐Aug‐18
0.03% 0.01% 0.02% 0.02%
0.15% 0.04% 0.11% 0.11%
100.000% 100.000% 100.000% 100.000%
100.00% 100.00% 100.00% 98.00%
0.00% 0.00% 0.00% ‐4.84%
100.00% 100.00% 100.00% 100.00%
100.00% 100.00% 100.00% 95.16%
100.00% 100.00% 100.00% 100.00%
0.00% 0.00% 0.00% 4.84%
4.40 CURING / WATERPROOFING / BACK FILLING INS
FN
CV
CUM
108
103.68
08‐Oct‐18
26‐Nov‐18
08‐Oct‐18
0.02%
0.11%
100.000%
92.00%
‐64.00%
96.00%
36.00%
96.00%
60.00%
0.04%
0.19%
100.000%
92.00%
‐20.19%
95.00%
79.81%
95.00%
15.19%
0.02% 0.04% 0.04%
0.07% 0.19% 0.19%
100.000% 100.000% 85.106%
100.00% 85.00% 80.00%
‐42.17% ‐42.17% ‐40.11%
100.00% 85.00% 85.00%
57.83% 57.83% 45.00%
100.00% 85.00% 85.00%
42.17% 27.17% 40.00%
0.04%
0.19%
60.417%
30.00%
‐23.72%
50.00%
36.70%
50.00%
13.30%
0.02% 0.02% 0.00% 0.01% 0.01%
0.07% 0.11% 0.02% 0.03% 0.05%
100.000% 100.000% 100.000% 100.000% 100.000%
100.00% 95.00% 100.00% 85.00% 70.00%
0.00% 0.00% ‐16.15% ‐16.15% ‐58.56%
100.00% 100.00% 100.00% 85.00% 75.00%
100.00% 100.00% 83.85% 83.85% 41.44%
100.00% 100.00% 100.00% 85.00% 75.00%
0.00% 0.00% 16.15% 1.15% 33.56%
0.01%
0.05%
100.000%
50.00%
‐57.30%
65.00%
42.70%
65.00%
22.30%
0.06%
0.30%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
METERING SKID 662 663 664 665
A2095‐2 A2140 A2140 A2140‐1
666
A2140‐2
4.40 EXCAVATION XX 4.40 FOUNDATION WORK (STEEL FIXING) XX 4.40 FOUNDATION WORK (STEEL FIXING) 4.40 FOUNDATION WORK (CONCRETE)
07‐Aug‐18 04‐Jul‐18 05‐Sep‐18 20‐Oct‐18
PIPE SUPPORT 668
A2095‐3
669 670 671
A2120 A2120 A2120‐1
672
A2120‐2
EXCAVATION FOR STRUCTURAL STEEL PIPE 4.40 SUPPORTS XX 4.40 FOUNDATION WORK (STEEL FIXING) XX 4.40 FOUNDATION WORK (STEEL FIXING) 4.40 FOUNDATION WORK (CONCRETE)
INS
FN
CV
CUM
50
47.5
04‐Aug‐18
15‐Nov‐18
04‐Aug‐18
INS INS INS
FN FN FN
CV CV CV
CUM CUM CUM
4200 4200 35
4200 3570 29.75
08‐Sep‐18 08‐Sep‐18 11‐Sep‐18
29‐Nov‐18 29‐Nov‐18 19‐Dec‐18
09‐Jul‐18 08‐Sep‐18 11‐Sep‐18
4.40 CURING / WATERPROOFING / BACK FILLING INS
FN
CV
CUM
76
38
16‐Sep‐18
02‐Jan‐19
16‐Sep‐18
4.40 4.40 4.40 4.40 4.40
INS INS INS INS INS
FN FN FN FN FN
CV CV CV CV CV
CUM CUM CUM CUM CUM
100 100 3647 3647 26
100 100 3647 3099.95 19.5
26‐May‐18 26‐May‐18 09‐Jul‐18 09‐Jul‐18 10‐Sep‐18
22‐Oct‐18 22‐Oct‐18 15‐Nov‐18 15‐Nov‐18 29‐Dec‐18
26‐May‐18 26‐May‐18 09‐Jul‐18 09‐Jul‐18 10‐Sep‐18
4.40 CURING / WATERPROOFING / BACK FILLING INS
FN
CV
CUM
206
133.9
18‐Sep‐18
15‐Dec‐18
18‐Sep‐18
INSTALLATION OF STRUCTURAL STEELWORK 4.40 OPERATINGNDCCESS PLATFORMS (TEST INS SEPERATOR & PLATFORM)
FN
STIN
Kg
9298
0
06‐Jan‐19
26‐Jan‐19
09‐Jul‐18
PSV 674 675 676 677 678
A2095‐4 A2095‐4 A2140‐3 A2140‐3 A2140‐4
679
A2140‐5
XX XX XX XX
EXCAVATION EXCAVATION FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (STEEL FIXING) FOUNDATION WORK (CONCRETE)
26‐May‐18 22‐Oct‐18 09‐Jul‐18
Structural Steel TEST SEPERATOR 682
A2660
Page 100 of 170
Sr.no. Activity ID XX 683
A2660‐1
Inv Code
Activity Name INSTALLATION OF LADDERS, STAIRS, HANDRAILS
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
INS
FN
STIN
INSTALLATION OF STRUCTURAL STEEL OF 4.40 METERING SKID INCL. WALK WAY OR CROSS INS OVER
FN
STIN
Kg
4.40
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
0
16‐Jan‐19
26‐Jan‐19
0.06%
0.30%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2470
0
09‐Jan‐19
21‐Jan‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
METERING SKID 685
A2670
PSV 687
A2680
INSTALLATION OF PSV VALVESCCESS PLATFORMS
INS
FN
STIN
Kg
1705
0
26‐Dec‐18
05‐Jan‐19
0.02%
0.08%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL PIPE 4.40 SUPPORTS & MODIFICATIONS OF EXISTINGCCESS PLATFORMS (IFPPLICABLE)
INS
FN
STIN
Kg
4078
0
10‐Jan‐19
30‐Jan‐19
0.02%
0.08%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.40 INSTALLATION OF INSTRUMENT STANCHION INS
FN
STIN
PCS
151
0
30‐Jan‐19
04‐Feb‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.10 INSTALLATION OF NEW TEST SEPARATOR
INS
FN
ME
SET
137.5
137.5
05‐Sep‐18
12‐Sep‐18
0.02%
0.10%
0.000%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
INS
FN
PPIN
0
24‐Mar‐19
24‐Mar‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
PPIN
0
24‐Mar‐19
31‐Mar‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS
FN FN
PPIN PPIN
0 0
31‐Mar‐19 15‐Apr‐19
15‐Apr‐19 22‐Apr‐19
0.06% 0.02%
0.29% 0.10%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0
21‐Jan‐19
13‐Feb‐19
0.08%
0.39%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
29‐Jan‐19
11‐Feb‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.40
PIPE SUPPORT 689
A2690
FIELD INSTRUMENT 691
A2700
Mechanical 693
696 697 698 699
A2875
Piping Pre Shutdownnd Plant Shutdown Tie‐in A3200‐a 4.10 MOBILIZATION OF OF TEAMPPLY PTW SCAFFOLDING / PLATE FORM / WORK A3200‐b 4.10 PERMIT ISSUE A3200‐1 4.10 PIPING TIE‐IN / NDT PRE SHUT DOWN A3200‐2 4.10 PIPING TIE‐IN / NDT SHUT DOWN PIPING ‐REMAINING PIPING INSTALLATION ON PIPE SUPPORT,PIERACK &ROUND EQUIPMENT
701
A3170
4.10
INS
FN
PPIN
702
A3170‐1
4.10 INSTALLATION OF BALL VALVE & GGC VALVE INS
FN
PPIN
703
A3190
4.10
704
A3180
4.10
705
A3200
4.10
706
A3201
4.10
HYDRO‐TESTING, FLUSHING, DRAININGND PURGING INLET PIPING TIE‐IN TO SEPARATOR (PARTIAL SHUTDOWN TIE‐IN) TIE‐IN REPLACE THE SHUTVALVET POINT OF OIL‐IN TIE‐IN / INSTALL SDV
DIN
316
05‐Sep‐18
12‐Sep‐18
INS
FN
PPIN
SET
240
0
02‐Feb‐19
16‐Feb‐19
0.08%
0.39%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
PPIN
DIN
316
0
15‐Apr‐19
20‐Apr‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
PPIN
PCS
1782
0
15‐Apr‐19
20‐Apr‐19
0.06%
0.27%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
PPIN
PCS
66
0
17‐Apr‐19
20‐Apr‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS INS
FN FN FN FN FN FN
EL EL EL EL EL EL
LM
141.9
LM
141.9
LM LM
88 116.6
0 0 0 0 0 0
08‐Nov‐18 31‐Dec‐18 30‐Dec‐18 06‐Jan‐19 30‐Jan‐19 16‐Feb‐19
24‐Dec‐18 05‐Jan‐19 07‐Jan‐19 19‐Jan‐19 18‐Feb‐19 28‐Feb‐19
0.00% 0.01% 0.02% 0.02% 0.01% 0.02%
0.00% 0.03% 0.07% 0.07% 0.06% 0.09%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Electrical 708 709 708 709 710 711
A2160‐11 A3930 A3730 A3730‐1 A3760 A3720
4.40 4.30 4.30 4.30 4.30 4.30
CABLE TRENCH EARTH PIT DRILLING U/G CABLE LAYING BACK FILLING OF CABLE TRENCH CABLE LAYING CABLE GLANDND TERMINATION
712
A3750
4.30 ELECTRICAL EQUIPMENTS INSTALLATION
INS
FN
EL
PCS
92.4
0
02‐Feb‐19
14‐Feb‐19
0.01%
0.07%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
713
A3770
4.30 LIGHTING FIXTUREND DB INSTALLATION
INS
FN
EL
PCS
231
0
21‐Feb‐19
03‐Mar‐19
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
714 715 716 717
A3740 A3760‐1 A3780 A3790
INS INS INS INS
FN FN FN FN
EL EL EL EL
LM
292.6
SET SET
44 44
0 0 0 0
26‐Jan‐19 03‐Mar‐19 07‐Mar‐19 10‐Mar‐19
04‐Feb‐19 07‐Mar‐19 09‐Mar‐19 13‐Mar‐19
0.02% 0.02% 0.01% 0.01%
0.07% 0.07% 0.03% 0.03%
0.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
INS INS INS
FN FN FN
IN IN IN
LM LM
36.3 36.3
0 0 0
16‐Jan‐19 27‐Jan‐19 30‐Jan‐19
30‐Jan‐19 30‐Jan‐19 02‐Feb‐19
0.00% 0.00% 0.00%
0.02% 0.00% 0.00%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
719 719 720
4.30 4.30 4.30 4.30 Instrument & Control A4200 4.20 A4940 4.20 A4930 4.20
720
A4220‐2
721
A4230
CABLE TRAY/DUCT INSTALLATION JB SUPPORT INSTALLATION JB INSTALLATION FIELD INSTRUMENT INSTALLATION 4.20 (GAUGESND TRANMITTERS) 4.20 INSTRUMENT CABLE LAYING
722
A4220
4.20 INSTRUMENT EQUIPEMNT INSTALLATION
721
A4980
4.20 CABLE GLANDND TERMINATION (ALONG JB) INS
722
A4990
4.20
723
A4240
4.20
724
A4220‐1
4.20
725
A4220‐3
4.20
726
A4230‐1
4.20
727
A4210
4.20
728
A5330
4.50
F&G System
CABLE TRAY INSTALLATION HOOK UP ELECTRICAL TIE‐INS ENERGIZATION
CABLE GLANDND TERMINATION (ALONG INSTRUMENTS) DCS MODIFICATION IN CONTROL ROOM BY VENDOR INSTALLATION OF INSTRUMENT VALVE INSTALLATION OF BS & WNALYZERS ON METERING SKID SS TUBEND LEAK TEST INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST INSTALLATION OF DELUGE
INS
FN
IN
0
23‐Jan‐19
18‐Feb‐19
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
IN
LM
1441
0
22‐Jan‐19
09‐Feb‐19
0.03%
0.14%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
IN
SET
317.9
0
23‐Jan‐19
12‐Feb‐19
0.05%
0.23%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
IN
LM
1441
0
10‐Feb‐19
20‐Feb‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
FN
IN
SET
317.9
0
16‐Feb‐19
23‐Feb‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00% 0.00%
INS
FN
IN
0
12‐Feb‐19
21‐Feb‐19
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
IN
0
10‐Feb‐19
12‐Feb‐19
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
IN
0
10‐Feb‐19
12‐Feb‐19
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
IN
0
23‐Feb‐19
26‐Feb‐19
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
IN
SET
154
0
25‐Feb‐19
03‐Mar‐19
0.02%
0.11%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FN
IN
SET
550
0
05‐Feb‐19
12‐Feb‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Page 101 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
719 719 720 720 721
A6360 A6370 A6380 A6390 A6400
4.50 4.50 4.50 4.50 4.50
F&G CABLE INSTALLATION F&G SUPPORT INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION
722
A6410
4.50 F&G CABLE GLANDINGND TERMINATION
721 722
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty 36.3 36.3
Actual phy Forecast Start progress (Rev : 04)
INS INS INS INS INS
FN FN FN FN FN
IN IN IN IN IN
LM LM
LM
INS
FN
IN
SET
A6420 A6430
INS INS
FN FN
IN IN
LM SET
730
4.50 F&G LOOP PREPARATION 4.50 F&G LOOP TESTING Painting & Fireproofing A4460 4.10 PIPING PAINTINGND TOUCH‐UP
INS
FN
FP
SQM
256
0
731
A4450
4.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS
FN
FP
SQM
247
0
732
A4470
4.50 FIREPROOFING FOR STRUCTURAL STEEL
INS
FN
FP
SQM
1256.2
0
INS
FN
DEM
PCS
8.8
DEPRESSURIZATION / ISOLATION (PIPING & INS INSTRUMENTATION)
FN
DEM
PCS
54.56
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
1441
0 0 0 0 0
22‐Jan‐19 27‐Jan‐19 29‐Jan‐19 30‐Jan‐19 02‐Feb‐19
30‐Jan‐19 30‐Jan‐19 02‐Feb‐19 31‐Jan‐19 04‐Feb‐19
0.01% 0.01% 0.01% 0.01% 0.01%
0.03% 0.03% 0.03% 0.03% 0.03%
0.000% 0.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
317.9
0
18‐Feb‐19
23‐Feb‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1441 317.9
0 0
23‐Feb‐19 24‐Feb‐19
24‐Feb‐19 27‐Feb‐19
0.01% 0.01%
0.03% 0.03%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
04‐Feb‐19
18‐Feb‐19
0.04%
0.19%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
04‐Feb‐19
18‐Feb‐19
0.04%
0.18%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
10‐Feb‐19
04‐Mar‐19
0.19%
0.92%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
07‐May‐19
09‐May‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
11‐May‐19
12‐May‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Demolition Works 734
DM1280
4.60 WORK PERMITPPROVED FOR DEMOLITION
735
DM1290
4.60
736
DM1310
4.60 APPLYNTI RUST TO FOUNDATION BOTLS
INS
FN
DEM
PCS
27.28
0
12‐May‐19
13‐May‐19
0.00%
0.02%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
737
DM1300
4.60 COLD CUTTING INLETND OUTLET PIPING
INS
FN
DEM
PCS
54.56
0
13‐May‐19
05‐Jun‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
738
DM1320
4.60 UNBOLD & REMOVE EXISTING SEPARATOR
INS
FN
DEM
PCS
190.96
0
05‐Jun‐19
06‐Jun‐19
0.03%
0.14%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
739
DM1330
4.60
REMOVE CONCRETE FOUNDATION / GRADE INS THEREA
FN
DEM
PCS
227
0
08‐Jun‐19
25‐Jun‐19
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
24‐Jun‐18
19‐Sep‐18
24‐Jun‐18
0.00%
0.00%
100.000%
100.00%
0.00%
100.00%
100.00%
100.00%
0.00%
INS
FM
DEM
0
01‐Nov‐18
06‐Nov‐18
01‐Nov‐18
0.000%
0.00%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
07‐Nov‐18
14‐Nov‐18
01‐Nov‐18
0.00%
0.00%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
COMPLETE DEMO WORK OF SEPARATOR & 5.60 METERING SKID FOUNDATION (CIVIL,PIPING, INS ELEC. & INSTR.)
FM
DEM
0
15‐Nov‐18
19‐Dec‐18
0.00%
0.00%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
07‐Nov‐18
12‐Nov‐18
0.01%
0.05%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
11‐Nov‐18
12‐Nov‐18
0.01%
0.05%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
5.60 ISOLATION OFSSOCIATED ELECTRICAL ITEMS INS
FM
DEM
0
13‐Nov‐18
14‐Nov‐18
0.01%
0.05%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
14‐Nov‐18
21‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
19‐Nov‐18
21‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
20‐Nov‐18
25‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
25‐Nov‐18
26‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
25‐Nov‐18
26‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
27‐Nov‐18
28‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
26‐Nov‐18
26‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
FAHM DEMOLITION WORKS 742
FM‐DEM‐1010
743
FM‐DEM‐1020
744
FM‐DEM‐1030
745
FM‐DEM‐1040
749
749
METHOD STATEMENT RE SUBMISSION &PPROVED BY QP OPERATION CLEARANCE & VESSEL DEPRESSURIZATION BY QP OPERATION 5.60 TEAM & HANDOVER TO CPECCTO START ISOLATION & DEMOLITION PURGING / SYSTEM ISOLATE SEPERATOR 5.60 FROM EXISTING SYSTEM 5.60
ISOLATION WORKS PIPING ISOLATION A5630 5.60 ISOLATION OF EXISTING VALVES INSTRUMENT ISOLATION A5640
5.60 ISOLATION OFSSOCIATED INTRUMENTS
19‐Sep‐18
ELECTRICAL ISOLATION 749
749
A5650
DEMOLITION WORKS DEMOLITION OF EXISTING PIPING REMOVAL OF EXISITNG PIPING WITH A5660 5.60 SEPARATOR DEMOLITION OF EXISTING INSTRUMENTATION 5.60
749
A5670
749
A5680
5.60
749
A5690
5.60
749
A5700
749
REMOVAL OF EXISITNG INTRUMENTSND CABLES WITH SEPARATOR
REMOVAL OF SEPARTOR FROM EXISTING LOGIC DISMANTLING OF EXISTING SEPARATOR REMOVAL OF EXISITNG INTRUMENTSND CABLES WITH SEPARATOR
REMOVAL OF SEPARTOR FROM EXISTING LOGIC REMOVAL OF SEPARTOR FROM EXISTING A5710 5.60 LOGIC DISMANTLING OF EXISTING SEPARATOR PLATFORM 5.60
A5750
5.60 APPLICATION OFNTI‐RUST PAINT/COATING
749
A5760
UNBOLTING OF SEPARATOR FROM 5.60 FOUNDATION
INS
FM
DEM
0
26‐Nov‐18
27‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
A5770
5.60 LIFITNGND REMOVAL FROM FOUNDATION
INS
FM
DEM
0
27‐Nov‐18
01‐Dec‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
DISMANTLING OF EXISTING METERING SKID
Page 102 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
A5720
5.60 APPLICATION OFNTI‐RUST PAINT/COATING
INS
FM
DEM
0
27‐Nov‐18
27‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
A5730
UNBOLTING OF PLATFORM FROM 5.60 FOUNDATION
INS
FM
DEM
0
27‐Nov‐18
28‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
A5740
5.60 LIFTINGND REMOVAL FROM FOUNDATION
INS
FM
DEM
0
01‐Dec‐18
02‐Dec‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
DISMANTLING OF EXISTING METERING SKID PLATFORM 749
A5780
5.60 APPLICATION OFNTI‐RUST PAINT/COATING
INS
FM
DEM
0
27‐Nov‐18
28‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
A5790
5.60 UNBOLTING FROM FOUNDATION
INS
FM
DEM
0
27‐Nov‐18
29‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
A5800
5.60 LIFTINGND REMOVAL FROM FOUNDATION
INS
FM
DEM
0
02‐Dec‐18
05‐Dec‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
DISMANTLING OF EXISTING PSV PLATFORM A5810
5.60 APPLICATION OFNTI‐RUST PAINT/COATING
INS
FM
DEM
0
27‐Nov‐18
28‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
A5820
UNBOLTING OF PLATFORM FROM 5.60 FOUNDATION
INS
FM
DEM
0
27‐Nov‐18
29‐Nov‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
A5830
5.60 LIFTINGND REMOVAL FROM FOUNDATION
INS
FM
DEM
0
04‐Dec‐18
05‐Dec‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
02‐Dec‐18
20‐Dec‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
06‐Dec‐18
15‐Dec‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
DEM
0
06‐Dec‐18
13‐Dec‐18
0.00%
0.01%
100.000%
65.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
749
749
749 749
749 750
DEMOLITION OF EXISITNG SEPARATOR FOUNDATION EXISTING SEPARATOR FOUNDATION A5840 5.60 DEMOLITION DEMOLITION OF EXISTING METERING SKID FOUNDATION A5850 5.60 EXISTING FOUNDATION DEMOLITION DEMOLITION OF EXISTING PSV FOUNDATION A5860 5.60 EXISTING FOUNDATION DEMOLITION INSTALLATION Civil Works COMMOMN A2230 5.40 GRADING CABLE TRENCHESND UTILITY ROAD A2300 5.40 CROSSINGS
INS
FM
CV
SQM
363
272.25
14‐Sep‐18
15‐Nov‐18
0.06%
0.27%
100.000%
65.00%
‐33.33%
75.00%
66.67%
75.00%
8.33%
INS
FM
CV
PCS
827.2
0
04‐Dec‐18
01‐Jan‐19
0.03%
0.15%
75.862%
0.00%
‐75.86%
0.00%
0.00%
0.00%
0.00%
SOAKWAY PIT EXCAVATION & INSTALLATION INS INCL. DEMOLITION ‐ IFPPLICABLE
FM
CV
0
25‐Nov‐18
18‐Dec‐18
0.03%
0.15%
91.667%
0.00%
‐91.67%
0.00%
0.00%
0.00%
0.00%
FM
CV
0
26‐Dec‐18
10‐Jan‐19
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
751
A2280‐3
5.40
752
A2230‐1
5.40 PROTECTION OF UNDERGROUND CABLES
753
A2290
754
A2310
ROADSND PAVING(INCLUDING 5.40 MODIFICATIONS) 5.40 DRAINAGE PIPE CULVERTS
755 756
INS
14‐Sep‐18
INS
FM
CV
SQM
0
0
18‐Apr‐19
07‐May‐19
0.03%
0.15%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
CV
LM
3.3
0
22‐Jan‐19
19‐Feb‐19
0.00%
0.00%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
A2320
5.40 ROAD SAFETY CRASH BARRIERSND BOLLARD INS
FM
CV
PCS
66
0
07‐May‐19
26‐May‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
A2350
RE‐INSTATEMENT OF EXISTING PAVEMENT 5.40 (INTERLOCK PAVING)
INS
FM
CV
SQM
171.6
0
07‐May‐19
26‐May‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS INS
FM FM FM FM FM FM
CV CV CV CV CV CV
CUM CUM CUM CUM CUM CUM
0 0 0 0 0 0
20‐Dec‐18 02‐Jan‐19 06‐Jan‐19 14‐Jan‐19 19‐Jan‐19 26‐Jan‐19
06‐Jan‐19 08‐Jan‐19 22‐Jan‐19 22‐Jan‐19 30‐Jan‐19 03‐Feb‐19
0.03% 0.00% 0.02% 0.01% 0.01%
0.14% 0.02% 0.08% 0.03% 0.11% 0.04%
100.000% 100.000% 12.500% 0.000% 100.000% 100.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% ‐12.50% 0.00% ‐100.00% ‐100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
INS
FM
CV
CUM
0
29‐Jan‐19
07‐Feb‐19
0.01%
0.04%
12.500%
0.00%
‐12.50%
0.00%
0.00%
0.00%
0.00%
INS
FM
CV
CUM
0
03‐Feb‐19
12‐Feb‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS INS
FM FM FM FM FM FM
CV CV CV CV CV CV
CUM CUM CUM CUM CUM CUM
0 0 0 0 0 0
01‐Jan‐19 22‐Jan‐19 22‐Jan‐19 31‐Jan‐19 06‐Feb‐19 11‐Feb‐19
26‐Jan‐19 07‐Feb‐19 31‐Jan‐19 07‐Feb‐19 16‐Feb‐19 18‐Feb‐19
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.000% 100.000% 12.500% 0.000% 100.000% 100.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% ‐12.50% 0.00% ‐100.00% ‐100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TEST SEPERATOR 758 759 760 761 758 759
A2240 A2250 A2240‐1 A2270 A2240‐11 A2240‐2
5.40 5.40 5.40 5.40 5.40 5.40
EXCAVATION BLINDING FOUNDATION (STEEL FIXING) FORMWORK FOR FOUNDATION FOUNDATION (CONCRETE) CURING
760
A2240‐22
5.40 WATER PROOFING (BITUMEN COATING)
761
A2240‐32
0.02%
758 759 760 761 758 759
5.40 BACKFILL TEST SEPERATOR PLATFORM A5900 5.40 EXCAVATION A2240‐62 5.40 BLINDING A5880 5.40 FOUNDATION (STEEL FIXING) A5890 5.40 FORMWORK FOR FOUNDATION A2240‐72 5.40 FOUNDATION (CONCRETE) A2240‐82 5.40 CURING
760
A2240‐42
5.40 WATER PROOFING (BITUMEN COATING)
INS
FM
CV
CUM
0
16‐Feb‐19
23‐Feb‐19
0.00%
0.00%
12.500%
0.00%
‐12.50%
0.00%
0.00%
0.00%
0.00%
761
A2240‐52
5.40 BACKFILL
INS
FM
CV
CUM
0
18‐Feb‐19
25‐Feb‐19
0.00%
0.00%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS INS
FM FM FM FM FM FM
CV CV CV CV CV CV
CUM CUM CUM CUM CUM CUM
0 0 0 0 0 0
30‐Dec‐18 01‐Jan‐19 05‐Jan‐19 09‐Jan‐19 12‐Jan‐19 21‐Jan‐19
12‐Jan‐19 08‐Jan‐19 14‐Jan‐19 14‐Jan‐19 21‐Jan‐19 28‐Jan‐19
0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
0.06% 0.06% 0.06% 0.06% 0.06% 0.06%
100.000% 100.000% 12.500% 0.000% 100.000% 100.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
‐100.00% ‐100.00% ‐12.50% 0.00% ‐100.00% ‐100.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
METERING SKID 763 759 760 761 758 759
A2240‐12 A2240‐92 A2240‐102 A2240‐122 A2240‐112 A2240‐132
5.40 5.40 5.40 5.40 5.40 5.40
EXCAVATION BLINDING FOUNDATION (STEEL FIXING) FORMWORK FOR FOUNDATION FOUNDATION (CONCRETE) CURING
60
760
A2240‐142
5.40 WATER PROOFING (BITUMEN COATING)
INS
FM
CV
CUM
0
28‐Jan‐19
30‐Jan‐19
0.01%
0.06%
12.500%
0.00%
‐12.50%
0.00%
0.00%
0.00%
0.00%
761
A2240‐152
5.40 BACKFILL
INS
FM
CV
CUM
0
30‐Jan‐19
06‐Feb‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
EXCAVATION FOR STRUCTURAL STEEL PIPE 5.40 SUPPORTS
INS
FM
CV
CUM
0
04‐Aug‐18
24‐Nov‐18
0.03%
0.14%
100.000%
63.00%
‐26.55%
63.00%
73.45%
63.00%
‐10.45%
PIPE SUPPORT 765
A2235‐4
Page 103 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
U.M.
Qty
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start 01‐Nov‐18
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
766
A2260‐3
5.40 BLINDING CONCRETE FOR PS FOUNDATIONS INS
FM
CV
CUM
0
07‐Nov‐18
05‐Dec‐18
0.00%
0.02%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
767 768 765 766
A2260 A2260‐4 A2260‐1 A2260‐2
5.40 5.40 5.40 5.40
INS INS INS INS
FM FM FM FM
CV CV CV CV
CUM CUM CUM CUM
0 0 0 0
13‐Nov‐18 20‐Nov‐18 21‐Nov‐18 24‐Nov‐18
12‐Dec‐18 12‐Dec‐18 20‐Dec‐18 23‐Dec‐18
0.02% 0.01% 0.03% 0.01%
0.10% 0.04% 0.15% 0.05%
100.000% 68.966% 100.000% 100.000%
0.00% 0.00% 63.00% 0.00%
‐100.00% ‐68.97% ‐100.00% ‐100.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00%
767
A2260‐5
5.40 WATER PROOFING (BITUMENT COATING)
INS
FM
CV
CUM
0
09‐Dec‐18
31‐Dec‐18
0.01%
0.05%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
768
A2260‐6
5.40 BACKFILLING
INS
FM
CV
CUM
0
16‐Dec‐18
07‐Jan‐19
0.01%
0.05%
68.966%
0.00%
‐68.97%
0.00%
0.00%
0.00%
0.00%
FOUNDATION WORK (STEEL FIXING) FORMWORK FOR FOR PS FOUNDAITON FOUNDATION WORK (CONCRETE) CURING
PSV 770
A2235‐5
INS
FM
CV
CUM
100
0
20‐Dec‐18
06‐Jan‐19
0.03%
0.15%
100.000%
0.00%
‐100.00%
0.00%
0.00%
0.00%
0.00%
771 772
A2280 A2280‐1
EXCAVATION (INCLUDINGREA LIGHTING POLES) 5.40 FOUNDATION WORK (STEEL FIXING) 5.40 FOUNDATION WORK (CONCRETE)
INS INS
FM FM
CV CV
CUM CUM
3647 26
0 0
06‐Jan‐19 22‐Jan‐19
22‐Jan‐19 07‐Feb‐19
0.01% 0.01%
0.03% 0.03%
100.000% 18.750%
0.00% 0.00%
‐100.00% ‐18.75%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
773
A2280‐2
5.40 CURING / WATERPROOFING / BACK FILLING INS
FM
CV
CUM
206
0
07‐Feb‐19
21‐Feb‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
26‐Feb‐19
21‐Mar‐19
0.05%
0.23%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.40
Structural Steel TEST SEPERATOR INSTALLATION OF LADDERS, STAIRS, HANDRAILS
776
A2730‐1
5.40
INS
FM
STIN
777
A2730
INSTALLATION OF STRUCTURAL STEELWORK 5.40 OPERATINGNDCCESS PLATFORMS (TEST INS SEPERATOR & PLATFORM)
FM
STIN
Kg
9298
0
26‐Feb‐19
21‐Mar‐19
0.05%
0.23%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INSTALLATION OF STRUCTURAL STEEL OF 5.40 METERING SKID INCL. WALK WAY OR CROSS INS OVER
FM
STIN
Kg
2470
0
04‐Feb‐19
17‐Feb‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
METERING SKID 779
A2740
PSV 781
A2750
INSTALLATION OF PSV VALVESCCESS PLATFORMS
INS
FM
STIN
Kg
1705
0
25‐Feb‐19
09‐Mar‐19
0.01%
0.06%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
STIN
Kg
4078
0
24‐Dec‐18
24‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
MODIFICATIONS OF EXISTING PIPE SUPORT INS /CCESS PLATFORMS
FM
STIN
0
24‐Dec‐18
09‐Jan‐19
0.01%
0.03%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.40 INSTALLATION OF INSTRUMENT STANCHION INS
FM
STIN
PCS
151
0
26‐Jan‐19
30‐Jan‐19
0.01%
0.04%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.10 INSTALLATION OF NEW TEST SEPARATOR
INS
FM
ME
SET
137.5
0
07‐Feb‐19
11‐Feb‐19
0.02%
0.10%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
HTAP
0
11‐Mar‐19
13‐Mar‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
HTAP
0
14‐Mar‐19
23‐Mar‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
HTAP
0
24‐Mar‐19
30‐Mar‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
HTAP
0
03‐Apr‐19
06‐Apr‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
PPIN
0
06‐Apr‐19
06‐Apr‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
PPIN
0
06‐Apr‐19
13‐Apr‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
02‐Feb‐19
24‐Feb‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
07‐Feb‐19
17‐Feb‐19
0.03%
0.13%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
25‐Mar‐19
06‐Apr‐19
0.03%
0.16%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
5.40
PIPE SUPPORT 783
A2760
INSTALLATION OF STRUCTURAL STEEL PIPE 5.40 SUPPORTS & MODIFICATIONS OF EXISTINGCCESS PLATFORMS (IFPPLICABLE)
784
A2760‐1
5.40
FIELD INSTRUMENT 786
A2770
Mechanical 788
A2900
Piping HOT TAPPING 791 792 793 794
796 797
MOBILIZATION OF HOT TAPPING SUB CONTRACTOR SCAFFOLDING / PLATE FORM / WORK HT1170 5.10 PERMIT ISSUE HT1180 5.10 HOT TAPPING / NDT HOT TAPPING COMPLETE / REMOVE HT1190 5.10 SCAFFOLD PIPE INSTALATION & Pre Shutdown WORKS A3260‐a 5.10 MOBILIZATION OF OF TEAMPPLY PTW SCAFFOLDING / PLATE FORM / WORK A3260‐b 5.10 PERMIT ISSUE HT1160
5.10
798
A3230
PIPING INSTALLATION ON PIPE 5.10 SUPPORT,PIERACK &ROUND EQUIPMENT
INS
FM
PPIN
799
A3230‐1
5.10 INSTALLATION OF BALL VALVE & GGC VALVE INS
FM
PPIN
800
A3250
FM
PPIN
801 802 804 805
807 808 807 808 809 810
HYDRO‐TESTING, FLUSHING, DRAININGND PURGING INLET PIPING TIE‐IN TO SEPARATOR A3240 5.10 (PARTIAL SHUTDOWN TIE‐IN) A3260 5.10 PIPING TIE‐IN / NDT PRE SHUT DOWN Plant Shutdown Tie‐in A3260‐1 5.10 PIPING TIE‐IN / NDT SHUT DOWN REPLACE THE SHUTVALVET POINT OF OIL‐IN A3261 5.10 TIE‐IN / INSTALL SDV Electrical A6530 5.40 CABLE TRENCH A3940 5.30 EARTH PIT DRILLING A3840 5.30 CABLE TRAY INSTALLATION A3830 5.30 U/G CABLE LAYING A3860 5.30 CABLE LAYING A3820 5.30 CABLE GLANDND TERMINATION 5.10
INS
DIN
347
SET
440
INS
FM
PPIN
DIN
347
0
06‐Apr‐19
11‐Apr‐19
0.05%
0.26%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
PPIN
PCS
1412.4
0
08‐Apr‐19
14‐Apr‐19
0.05%
0.26%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
PPIN
0
15‐Apr‐19
22‐Apr‐19
0.03%
0.16%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
PPIN
PCS
66
0
21‐Apr‐19
22‐Apr‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS INS
FM FM FM FM FM FM
EL EL EL EL EL EL
LM NO LM LM LM LM
500 3 292.6 253 184.8 116.6
0 0 0 0 0 0
03‐Dec‐18 19‐Jan‐19 17‐Feb‐19 13‐Feb‐19 20‐Feb‐19 21‐Feb‐19
26‐Dec‐18 23‐Jan‐19 03‐Mar‐19 21‐Feb‐19 03‐Mar‐19 03‐Mar‐19
0.00% 0.00% 0.01% 0.04% 0.03% 0.02%
0.00% 0.02% 0.05% 0.19% 0.14% 0.09%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Page 104 of 170
Sr.no. Activity ID XX
Inv Code
Activity Name
3963‐ PHASE
3963‐ AREA
3963‐ DISC
811
A3850
5.30 ELECTRICAL EQUIPMENTS INSTALLATION
INS
FM
EL
812
A3830‐1
5.30 BACK FILLING OF CABLE TRENCH
INS
FM
EL
813
A3870
5.30 LIGHTING FIXTUREND DB INSTALLATION
INS
FM
EL
814 815 816
A3890‐1 A3880 A3890
INS INS INS
FM FM FM
EL EL EL
5.30 HOOK UP 5.30 ELECTRICAL TIE‐INS 5.30 ENERGIZATION Instrument & Control
U.M.
Qty
PCS
92.4
PCS SET SET
Actual phy Forecast Start progress (Rev : 04)
Forecast Finish (Rev : 04)
Actual Start
Actual Finish
Overall Const. Ind. Last Week Last Weekct Current Current Project Wtg. Wtg. Plan (Cum) (Cum) Week Plan Weekctual
Plan % (Rev : 04)
Actual %
Variance
0
21‐Feb‐19
12‐Mar‐19
0.01%
0.07%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0
23‐Feb‐19
03‐Mar‐19
0.02%
0.07%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
231
0
05‐Mar‐19
12‐Mar‐19
0.04%
0.17%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
44 44
0 0 0
12‐Mar‐19 14‐Mar‐19 17‐Mar‐19
14‐Mar‐19 17‐Mar‐19 20‐Mar‐19
0.02% 0.01% 0.01%
0.07% 0.03% 0.03%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
818
A4260
5.20 CABLE TRAYND SUPPORT INSTALLATION
INS
FM
IN
LM
36.3
0
16‐Feb‐19
05‐Mar‐19
0.02%
0.08%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
818 819 819
A5000 A5040 A4290
5.20 JB SUPPORT INSTALLATION 5.20 JB INSTALLATION 5.20 INSTRUMENT CABLE LAYING
INS INS INS
FM FM FM
IN IN IN
LM LM LM
36.3 1563.1 1563.1
0 0 0
03‐Mar‐19 06‐Mar‐19 28‐Feb‐19
05‐Mar‐19 09‐Mar‐19 19‐Mar‐19
0.00% 0.00% 0.02%
0.01% 0.01% 0.08%
0.000% 0.000% 0.000%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
0.00% 0.00% 0.00%
820
A5050
5.20 CABLE GLANDND TERMINATION (ALONG JB) INS
FM
IN
SET
317.9
0
09‐Mar‐19
19‐Mar‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
820
A4280
5.20 INSTRUMENT EQUIPEMNT INSTALLATION
INS
FM
IN
SET
317.9
0
11‐Mar‐19
20‐Mar‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
821
A4280‐2
5.20
INS
FM
IN
0
11‐Mar‐19
18‐Mar‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
822
A5340
5.50
INS
FM
IN
0
11‐Mar‐19
20‐Mar‐19
0.01%
0.05%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
821
A5060
5.20
INS
FM
IN
0
18‐Mar‐19
24‐Mar‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
823
A4920
5.20
INS
FM
IN
0
19‐Mar‐19
30‐Mar‐19
0.02%
0.10%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
824
A4280‐3
5.20
825
A4280‐1
5.20
826
A4270
5.20
827
A4290‐1
5.20
FIELD INSTRUMENT INSTALLATION (GAUGESND TRANSMITTER) INSTALLATION OF DELUGE CABLE GLANDND TERMINATION (ALONG INSTRUMENTS) DCS MODIFICATION IN CONTROL ROOM BY VENDOR INSTALLATION OF BS & WNALYZERS ON METERING SKID INSTALLATION OF INSTRUMENT VALVE INSTRUMENT EQUIPMENT CALIBRATION / LOOP TEST SS TUBEND LEAK TEST F&G CABLE INSTALLATION F&G SUPPORT INSTALLATION F&G DEVICES INSTALLATION F&G JB SUPPORT INSTALLATION F&G JB INSTALLATION
SET
671
INS
FM
IN
0
16‐Mar‐19
18‐Mar‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
IN
0
16‐Mar‐19
18‐Mar‐19
0.06%
0.30%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
IN
0
30‐Mar‐19
02‐Apr‐19
0.06%
0.30%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS
FM
IN
0
19‐Mar‐19
21‐Mar‐19
0.08%
0.40%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
INS INS INS INS INS
FM FM FM FM FM
IN IN IN IN IN
LM LM LM LM SET
36.3 36.3 1563.1 1563.1 317.9
0 0 0 0 0
28‐Feb‐19 02‐Mar‐19 05‐Mar‐19 06‐Mar‐19 09‐Mar‐19
10‐Mar‐19 05‐Mar‐19 09‐Mar‐19 07‐Mar‐19 10‐Mar‐19
0.00% 0.00% 0.00% 0.00% 0.00%
0.01% 0.01% 0.01% 0.01% 0.01%
0.000% 0.000% 0.000% 0.000% 0.000%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00%
SET
317.9
0
19‐Mar‐19
24‐Mar‐19
0.00%
0.01%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
671
0 0
24‐Mar‐19 25‐Mar‐19
25‐Mar‐19 28‐Mar‐19
0.00% 0.00%
0.01% 0.01%
0.000% 0.000%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
SET
154
F&G System 818 818 819 819 820
A6440 A6450 A6460 A6470 A6480
5.50 5.50 5.50 5.50 5.50
820
A6490
5.50 F&G CABLE GLANDINGND TERMINATION
INS
FM
IN
821 822
A6500 A6510
INS INS
FM FM
IN IN
5.50 F&G LOOP PREPARATION 5.50 F&G LOOP TESTING Painting & Fireproofing
SET
829
A4480
5.40 STRUCTURAL STEEL PAINTINGND TOUCH‐UP INS
FM
FP
SQM
196
0
19‐Mar‐19
30‐Mar‐19
0.03%
0.14%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
830
A4500
5.50 FIREPROOFING FOR STRUCTURAL STEEL
INS
FM
FP
SQM
1002.1
0
25‐Mar‐19
08‐Apr‐19
0.15%
0.74%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
831
A4490
5.10 PIPING PAINTINGND TOUCH‐UP
INS
FM
FP
SQM
277
0
27‐Mar‐19
06‐Apr‐19
0.04%
0.20%
0.000%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Page 105 of 170
PROJECT PLANNING PACKAGE
Attachment 10
EQUIPMENT DEPLOYMENT
Page 106 of 170
Sr.No.
DESCRIPTION
PEAK
M/C
QTY
MONTHS
Project Timeline (Monthwise) Nov-18 Dec-18 Jan-19
15
1
2
2
Feb-19
Mar-19
Apr-19
May-19
Jun-19
2
2
2
2
2
1
BOOM TRUCK
2
2
3-TON PICKUP
1
8
1
1
1
1
1
1
1
1
3
BOBCAT
2
12
1
2
2
2
2
1
1
1
4
DUMP TRUCK
2
12
2
2
2
2
2
2
5
WATER TANKER
3
21
2
2
2
3
3
3
3
3
6
VIBRATORS
2
9
2
2
2
1
1
1
7
VACCUM TRUCK
2
11
1
1
1
1
2
2
2
1
8
CONCRETE MIXER MACHINE
1
5
1
1
1
1
1
1
1
9
REBAR BENDING MACHINE
1
5
1
1
1
1
1
10
LOADER
1
5
1
1
1
1
1
11
HILTI MACHINE
1
8
1
1
1
1
1
1
12
JACK HAMMER
2
11
2
2
2
2
2
1
13
LEVELLING STAFF
3
17
3
3
3
2
2
2
14
CONCRETE CUTTING MACHINE
1
6
1
1
1
1
1
1
15
TOTAL STATION
3
18
3
3
3
2
2
2
16
PLATE COMPACTOR
1
6
1
1
1
1
1
1 1
17
JUMPING COMPACTOR
1
6
1
1
1
1
1
18
01 TON ROLLER
1
5
1
1
1
1
1
2
1
19
ASPHALT CUTTING MACHINE
1
7
1
1
1
1
1
1
1
BATTERY DRILL MACHINE
2
16
2
2
2
2
2
2
2
2
21
BATTERY HILTI MACHINE
2
16
2
2
2
2
2
2
2
2
22
JACK HYDRAULIC 07 TON WELDING GENERATOR
1
8
1
1
1
1
1
1
1
1
10
63
7
8
10
10
10
10
6
2 1
24
CRANE 50T
3
11
1
1
1
1
2
3
1
25
CRANE 100T
2
10
2
2
1
1
1
2
1
1
1
1
2
2
2
1
2
2
3
2
1
1
1
2
2
2
26
TRAILER 20T
2
11
27
PWHT MACHINE
3
10
28
DIESEL GENERATOR 100KW
2
11
29
FORKLIFT 10T
5
13
30
SUV
3
31
PICK-UP
32 33
Aug-19
2
20
23
Jul-19
1
1
1
1 2
2
3
3
3
27
3
3
3
3
3
3
3
3
5
42
5
5
5
5
5
5
4
4
4
BUS
2
16
2
2
2
2
2
2
2
1
1
MINI BUS
3
17
2
2
2
2
2
2
2
2
1
56
59
62
63
66
64
47
32
9
3
-
TOTAL
66
458
REPLACEMENT THREE PHASE TEST SEPARATOR 00 Rev. No.
ISSUED FOR APPROVAL Detail
1-Nov-18 Date
TAA BY
Page 107 of 170
PROJECT PLANNING PACKAGE
Attachment 11
WEEKLY REPORT FORMAT
Page 108 of 170
Contract No.: QP Project No.: Location Code(s):
GC16101100 3963 DGEN (FAHM, FAHN, FAHS, JALM, KAHM, KAHN, KAHS)
Tag Area(s): Contractor: Contract Title:
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3-PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS, DUKHAN
Document Title:
WEEKLY PROGRESS REPORT Cut-off Date: 08-Mar-2017
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION
8th Mar
0
Issue for Information
Li Xiuwang
Zafar
Wang Xilin
DATE
REV. NO
REASON FOR REVISION
PREPARED
CHECKED
APPD.
DOCUMENT NUMBER:
3963-WPR-0002
SHT.
001
OF
009
APPD. QP
REV. 0
Page 109 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report
TABLE OF CONTENTS 1.0
MANAGEMENT / EXECUTIVE SUMMARY ............................................................................... 3
2.0
QUALITY AND SAFETY STATUS .............................................................................................. 3
3.0
PROGRESS STATISTICS .......................................................................................................... 5
4.0
DETAILED STATUS AND 2 WEEKS LOOK-AHEAD WITH NARRATIVES .............................. 5
5.0
AREAS OF CONCERNS ............................................................................................................ 7
6.0
SUMMARY STATUS FROM ENGINEERING AND PROCUREMENT REGISTERS ................. 8
7.0
CORRESPONDENCE LOG FOR THE WEEK ........................................................................... 8
8.0
PROGRESS S CURVES ............................................................................................................ 8
9.0
MANPOWER HISTOGRAM WITH SUMMARY TABLE.............................................................. 8
10.0
EQUIPMENT DEPLOYMENT DURING THE REPORTING PERIOD ........................................ 9
DOC. NO.: 3963-WPR-0002
REV.#0
Page 2 of 9 Page 110 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report
1.0
MANAGEMENT / EXECUTIVE SUMMARY China Petroleum Engineering & Construction Corporation (CPECC) has been awarded contract for EPIC by Qatar Petroleum. The project scope covers the replace the Old Three Phase Test Separators with suitably sized New Three Phase Test Separators including the associated metering skids at KAHN, KAHM, KAHS, FAHN, FAHM, FAHS and JALM Degassing Stations at Dukhan Field. The existing old test separators and associated piping, structures, utilities, instrumentation shall be demolished. Effective date of the project is 19-Feb-2017 and completion 18-Feb-2019. Major achievements:
Submitted Performance Bond and Project Insurances
CPECC, commercial registration is approved by Ministry of Commerce and Economic and received approval message.
CPECC proceeding for trade License requirements.
Detailed engineering site survey is planned from 19th March.
Shutdown activities related to engineering and procurement is consider to at most critical for three degassing station.
Draft Contract document is still with QP.
RFQ for the camp with AMWAJ Company and ALAQARIA Company.
Planning package is under preparation. Since engineering team is engaged to developed shutdown package at early stage of project. Planning package will be submitted on 12th March
2.0
QUALITY AND SAFETY STATUS
2.1
QA/QC
No.
Documents
Status
Submit Day
1
Project QA/AC Plan
Ongoing
Plan-25-03-2017
2
Quality Records Forms
Ongoing
Plan-20-03-2017
3
CPECC Quality Management Procedure
Ongoing
Plan-25-03-2017
4
ITP plan
Ongoing
Plan-25-03-2017
Visual Inspection:
NIL
RFI Issuance:
NIL
Vendor document reviewed: NIL
Quality meeting:
DOC. NO.: 3963-WPR-0002
NIL REV.#0
Page 3 of 9 Page 111 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report
2.2
HSE
Status HSE deliverable status:
No.
Status
Documents
Submission
1
Project HSE Plan
Ongoing
Plan - 30-03-2017
2
Emergency Response Plan
Ongoing
Plan - 30-03-2017
3
Road Safety Plan
Ongoing
Plan - 30-03-2017
4
HSE Training Plan
Ongoing
Plan - 30-03-2017
5
Environment Management Plan
Ongoing
Plan - 25-03-2017
6
HSE Audit and Inspection Procedure
Ongoing
7
Construction and Fabrication HSE Procedures
Ongoing
8
Incentive and Disciplinary Procedure
Ongoing
9
Incident investigation and reporting procedure
Ongoing
Plan - 20-03-2017
Plan - 30-03-2017
Plan - 30-03-2017
Plan - 30-03-2017
HSE Statistics
No.
DESCRIPTION
This Week
Year Todate
Project Todate
1
FATALITIES
0
0
0
2
MAN-POWER
19
36
36
3
MAN-HOURS WORKED
760
1440
1440
4
0
0
0
5
LOST TIME INCIDENT FREQUENCY (LTIF) TOTAL RECORDABLE INCIDENT RATE: (TRIP = TRI 1,000,000/MAN-HOURS)*
0
0
0
6
VEHICLE ACCIDENT
0
0
0
7
FIRST-AID CASES
0
0
0
8
HAZARDS & NEAR MISSES
0
0
0
REMARKS (If any)
* TRI = Fatality + Restricted Workday Case (RWC) + Medical Treatment Case (MTC)
DOC. NO.: 3963-WPR-0002
REV.#0
Page 4 of 9 Page 112 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report
3.0
PROGRESS STATISTICS Progress Statistics (Planned Vs Actual progress)
Overall Project
S. No. 1 2 3 4 5
PREVIOUS WEEK
DESCRIPTION ENGINEERING PHASE PROCUREMENT PHASE CONSTRUCTION PHASE PRECOMMISSIONING & COMMISSIONING CLOSE-OUT DOCUMENTS
Overall Project
CURRENT WEEK
UP TO DATE
REL. WT. %
PLANNED
ACTUAL
DEV.
PLANNED
ACTUAL
DEV.
PLANNED
ACTUAL
DEV.
3.98%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
65.02%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
21.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
8.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
4.0
DETAILED STATUS AND 2 WEEKS LOOK-AHEAD WITH NARRATIVES
4.1
Engineering Activities of This Week Process
Review of Feed Package is ongoing.
Markup of P&IDs related to shutdown tie-in works is finalized.
Early Tie-ins Philosophy is under preparation.
Required input for Valves related to shutdown tie-ins is finalized.
Safety & Loss Prevention
Review of Feed Package is ongoing.
Piping
Review of Feed Package is ongoing.
Markup of Specifications and PMS related to shutdown tie-ins works is in progress.
Preparing Datasheets for Valves.
Preparing Need List for Site Survey is in progress.
Mechanical
Review of Feed Package is ongoing.
DOC. NO.: 3963-WPR-0002
REV.#0
Page 5 of 9 Page 113 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report
Preparing Need List for Site Survey.
Electrical
Review of Feed Package is ongoing.
Preparing Need List for Site Survey.
Instrumentation
Review of Feed Package is ongoing.
Preparing Need List for Site Survey.
Civil & Structural
Review of Feed Package is ongoing.
Preparing Need List for Site Survey.
Scope of work for U/G survey is under preparation.
Activities Look-Ahead for Next 2 Weeks Process
Prepare inputs for DBM.
Finalize Early Tie-ins Philosophy.
Safety & Loss Prevention
Prepare inputs for DBM.
Piping
Prepare inputs for DBM.
Marking of Specifications and PMS related to shutdown tie-ins works will be finalized.
Datasheets for Valves (related to shutdown tie-in works) will be finalized.
Conducting site survey.
Mechanical
Prepare inputs for DBM.
Electrical
Prepare inputs for DBM.
Conducting site survey.
Instrumentation
Prepare inputs for DBM.
DOC. NO.: 3963-WPR-0002
REV.#0
Page 6 of 9 Page 114 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report
Conducting site survey.
Civil & Structural
4.2
Prepare inputs for DBM.
Finalize U/G survey scope of work.
Procurement Activities of This Week Nil Activities Look-Ahead for Next 2 Weeks
4.3
RFQ for Shutdown valves issuance.
Construction Activities of This Week
Prepare the planning package.
Pre-RFQ for construction equpment.
Activities Look-Ahead for Next 2 Weeks
4.4
Site survey is planned from 19 to 23th March.
Renting Camps.
Contact and pay a visit to local subcontractor.
HSE
4.5
Preparing the HSE documents according to QP’s HSE procedures and standards.
QA/QC
QA/QC plan will be submitted by 25-03-2017
5.0
AREAS OF CONCERNS
5.1
General Nil
5.2
Engineering Early approval of deliverables based on preliminary markup (Only for early tie-ins scope / activities).
5.3
Procurement To approve the shutdown procurement package in 5 days.
DOC. NO.: 3963-WPR-0002
REV.#0
Page 7 of 9 Page 115 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report 5.4
Construction NIL
5.5
HSE CPECC request for HSE standards and procedures, the list of requested HSE documents has already been sent to QP through DCC of CPECC. Request for the name list of QP approved third party, including training, equipment & tools inspection, waste disposal, PPE brands, medical service, etc.
5.6
QA/QC NIL
6.0
SUMMARY STATUS FROM ENGINEERING AND PROCUREMENT REGISTERS Summary Status from Engineering and Procurement Registers (Planned Vs Actual in numbers)
6.1
Engineering EDR under preparing
6.2
Procurement Nil
7.0
CORRESPONDENCE LOG FOR THE WEEK See Attachment (format) 7.1 List of Overdue Documents 7.2 List of Documents Issued and Received 7.3 List of Correspondence from CPECC to QP 7.4 List of Correspondence from QP to CPECC
8.0
PROGRESS S CURVES (attachment format only) See Attachment (format) 8.1 - (Overall S-Curve) 8.2 – Engineering 8.3– Procurement 8.4 - Construction
9.0
MANPOWER HISTOGRAM WITH SUMMARY TABLE See Attachment 9.1-Home Office Manpower Histogram 9.2-Construction Manpower Deployment Schedule
DOC. NO.: 3963-WPR-0002
REV.#0
Page 8 of 9 Page 116 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Weekly Progress Report
10.0
EQUIPMENT DEPLOYMENT DURING THE REPORTING PERIOD See Attachment 10.1-Construction Plant & Equipment Deployment Schedule
DOC. NO.: 3963-WPR-0002
REV.#0
Page 9 of 9 Page 117 of 170
PROJECT PLANNING PACKAGE
Attachment 12
MONTHLY REPORT FORMAT
Page 118 of 170
TABLE OF CONTENTS 1.0
MANAGEMENT / EXECUTIVE SUMMARY ............................................................................... 2
2.0
QA/QC STATUS ........................................................................................................................ 2
3.0
Safety Status .............................................................................................................................. 4
4.0
Project Control ........................................................................................................................... 4
5.0
DETAILED STATUS .................................................................................................................. 5
6.0
AREAS OF CONCERNS ............................................................................................................ 6
7.0
CORRESPONDENCE LOG FOR THE MONTH ........................................................................ 7
8.0
COST CONTROL REPORTS .................................................................................................... 7
9.0
Project Photographs ................................................................................................................... 8
Page 119 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report
1.0
MANAGEMENT / EXECUTIVE SUMMARY Management / Executive Summary (Project information along with major achievements), including a brief summary of the project.
Project information with Milestone Status
Milestone Description
Planned Date
Actual Date
Status
1. 2. 3. 4.
Overall progress statistics ( Planned Vs Actual)
Cutoff Date
Overall Planned %
Overall Progress %
Variance %
Engineering Procurement Construction Overall
Write-up on Major achievements for each phase
Narrative
2.0
Major Areas of concern affecting schedule completion
Updated Level 1 Schedule ( attachment -1)
Updated Overall Progress Curve ( attachment -2)
Updated Overall Manpower Histogram ( attachment -3)
QA/QC STATUS This Section shall include a comprehensive report on QA/QC aspects of the project. Following shall be included in detail:
No.
QA/QC document Status
Documents
Rev. no
Status
Planned Submission
1
DOC. NO.: 3963-MPR-0001
REV.#0
Page 2 of 8 Page 120 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report
2 3
Quality Audit Schedule for each phase S.no
Department
Audit Date
Close Reporting Date
Status
Next Audit Planned
Impact
Status
1 2 3
Concession Request (CR) with Cost/Time Impact Status S.no
Content of CR
Cause
Date Requested
1 2 3
No.
Non Conformance Report (NCR) and Corrective Action Report (CAR) Status
Name of nonconforming product
Nonconforming products No.
Time
Unit
Nonconforming causes
Corrective and preventive Actions
Closing time
Current status
Remarks
1 2 3
Inspection and Clearance Status REQUEST FOR INSPECTION (RFI) STATISTICS
No.
INSPECTION
Total RFI 1
RC
0
2
STEEL STRUCUTRE
0
3
PIPING
0
DOC. NO.: 3963-MPR-0001
Total Accepted
Total Cancelled
QP Closed
REV.#0
% Accepted
% Cancelled
% QP Closed
Page 3 of 8 Page 121 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report 4
NDT
0
5
TEST
0
3.0
Safety Status This Section shall include following in detail:
4.0
Lost Time Accidents
Incidents / Near Misses
Safety meetings / Tool room workshops held during the month
Safety man-hours status table as per approved QP format.
Sl. No.
DESCRIPTION
This Week
Year To date
Project To date
1
FATALITIES
0
0
0
2
MAN-POWER
17
17
17
3
MAN-HOURS WORKED
680
1360
1360
4
LOST TIME FREQUENCY (LTIF)
0
0
0
5
TOTAL RECORDABLE INCIDENT RATE: (TRIP = TRI 1,000,000/MANHOURS)*
0
0
0
6
VEHICLE ACCIDENT
0
0
0
7
FIRST-AID CASES
0
0
0
8
HAZARDS & NEAR MISSES
0
0
0
9
SAFETY MEETINGS
1
1
1
10
TOOL BOX TALKS
0
0
0
INCIDENT
Project Control This Section shall include following in detail:
Updated Milestone Status with forecast completion dates ( from P6 file)
Critical activity listing with total floats based on current update ( from P6 file)
Mitigation plan for arresting delays, if any
DOC. NO.: 3963-MPR-0001
REV.#0
Page 4 of 8 Page 122 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report
5.0
DETAILED STATUS This Section shall include following in detail:
5.1
Summary Status from Engineering and Procurement Registers (Planned Vs Actual in numbers) Engineering
Total Documents
Planned to Issue
Actual Issue
Variance
Planned for next month to issue
Total Numbers
Planned to Issue
Actual Issue
Variance
Planned to Issue
Actual Issue
Variance
Procurement
Description
RFQ PO Vendor Data Material Delivery to Site
5.2
Progress per discipline
Description
Total Numbers
Process Instrumentation Electrical Civil
DOC. NO.: 3963-MPR-0001
REV.#0
Page 5 of 8 Page 123 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report
5.3
A narrative of the months events by discipline for each phase XXXXXXX
5.4
Forecast for next reporting period XXXXXXX
5.5
“Hold” Register Document no
Description
Planned to Issue
Actual Issue
Variance
Planned to Issue
Actual Issue
Variance
1. 2. 3. 4.
5.6
Critical pending approval Status Document no
Description
1. 2. 3. 4.
5.7
Productivity table during the reporting period XXXXXXX
6.0
AREAS OF CONCERNS This Section shall include following in detail:
6.1
Concern on critical activities, if any Narrative
6.2
Late Finish Date and Anticipated Completion Date for these activities Activity ID
Description
DOC. NO.: 3963-MPR-0001
Late Finished Date
REV.#0
Anticipated Completion Date
Remarks
Page 6 of 8 Page 124 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report
1. 2. 3. 4.
6.3
Impact on Schedule Narrative support
7.0
CORRESPONDENCE LOG FOR THE MONTH 7.1 - List of Overdue Documents 7.2 - List of Documents Issued and Received 7.3 - List of Correspondence from CPECC to QP 7.4 - List of Correspondence from QP to CPECC
8.0
COST CONTROL REPORTS This Section shall include following in detail:
8.1
Cost Report Cost report indicating payable amount for the month and cumulative showing breakdown as in Schedule of Price.
8.2
8.3
Invoice Register
Invoice details
Details of invoices submitted
Amount of each invoice ( including reporting month)
Details of invoices paid
Date when payment was received
Cumulative Payment as on date
Details on Bank Guarantees
Actual and Forecast Cash flow curve
Variation Register giving the following details
Variation Order Number
Brief Description
Variation Amount
Paid Amount
DOC. NO.: 3963-MPR-0001
REV.#0
Page 7 of 8 Page 125 of 170
Project No.: 3963 EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK Monthly Progress Report
8.4
Change Register giving the following details
9.0
Work Change Request / Claims submitted details.
Brief Description
Schedule and Cost Impact
QP Response
Work Change Request / Claim Status
Project Photographs This Section shall include following in detail:
10.0
Concern on critical activities, if any
Late Finish Date and Anticipated Completion Date for these activities
Impact on Schedule
LIST OF ATTACHMENTS
• • •
Updated Level 1 Schedule ( attachment -1) Updated Overall Progress Curve ( attachment -2) Updated Overall Manpower Histogram ( attachment -3)
•
List of Overdue Documents (attachment-4)
•
List of Documents Issued and Received (attachment-5)
•
List of Correspondence from CPECC to QP (attachment-6)
•
List of Correspondence from QP to CPECC (attachment-7)
DOC. NO.: 3963-MPR-0001
REV.#0
Page 8 of 8 Page 126 of 170
PROJECT PLANNING PACKAGE
Attachment 13
PRODUCTIVITY CALCULATION
Page 127 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHM DEGASSING STATION ITEM NUMBER 1 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10
ACTIVITY DESCRIPTION MECHANICAL SEPARATOR INSTALLATION PIPING TOTAL LENGTH Nos. of WELDS DIN (Fabrication) DIN (Erection) Nos. of RADIOGRAPHS TIE-INS SHUTDOWN TIE-INS NON SHUTDOWN PWHT ELECTRICAL Low Voltage cable cable gland earthing cable earth rod earth busbar exothermic weld (T-JOINT) and connector EARTH BOSS cable tray cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND E
SKILLED WORKER HOURS
EA
1
EA/H
0.01
125
125
LM EA DIN DIN PC EA EA EA
501 704 1224 1224 3207 10 2 476
LM/H
1.20
418
418
DIN/H DIN/H FILM/H EA/H EA/H EA/H
3.00 1.50 4.00 0.01 0.01 0.67
408 816 802 1120 224 710
408 816 802 1120 224 710
LM PCS LM PCS PCS PCS PCS LM PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS
1550 14 130 3 5 31 1 140 5 0 1 15 15 1 1 47 1 1
LM/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H
6.00 0.50 8.90 0.22 0.25 0.50 0.13 0.57 0.25
258 28 15 14 20 62 8 246 20
0.13 0.50 0.25 0.01 0.01 0.06 0.13 0.13
8 30 60 180 180 752 8 8
SET SET SET SET SET SET SET SET SET SET
6 4 3 5 5 2 5 1 3 5
SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H
0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20
24 16 12 20 10 4 40 8 15 25
LABOUR HOURS
MARK
258 28 15 14 20 62 8 246 20 0 8 30 60 180 180 752 8 8 0 24 16 12 20 10 4 40 8 15 25
Page 128 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHM DEGASSING STATION ITEM NUMBER 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 1 2 3 1 2 3 4 1 2
ACTIVITY DESCRIPTION toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests
SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS PCS PCS
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND E 0.20 5 SET/H 25 0.20 3 SET/H 15 0.13 1 SET/H 8 0.13 1 SET/H 8 0.13 2 SET/H 16 0.13 3 SET/H 24 0.13 1 SET/H 8 0.50 2 SET/H 4 0.13 12 PCS/H 96 6.00 6368 LM/H 1061 0.50 139 PCS/H 278 0.57 19 LM/H 33 1.00 139 LM/H 139 1.00 92 PCS/H 92 8.00 216 SET/H 27 0.30 49 LM/H 163 0.20 22 LM/H 110 0.50 47 LM/H 94 2.00 190 PCS/H 95 2.00 22 PCS/H 11 3.00 32 PCS/H 11
SQM SQM SQM SQM
445.4 301.809 126.4081 455.4
SQM/H SQM/H SQM/H SQM/H
0.50 0.40 0.25 0.50
891 755 506 911
445 453 303 546
445 302 202 364
TON CUM EA
12.02 29.39 1
Kg/H CUM/H EA/H
48.00 1.00 0.01
250 29 83
125
125 29
SET SET SET SET
1 1 1 1
SET/H SET/H SET/H SET/H
0.00 0.01 0.00 0.00
400 200 400 400
400 200 400 400
SET SET
1 1
SET/H SET/H
0.00 0.00
800 1440
800 640
UNIT
SKILLED WORKER HOURS
LABOUR HOURS
MARK
25 15 8 8 16 24 8 4 96 1061 278 33 139 92 27 163 110 94 95 11 11
83
Page 129 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHN DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
CIVIL WORKS
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL MACHIN ESTIMATE Y UNIT HOURS HAND E
SKILLED WORKER HOURS
LABOUR HOURS
1
EXCAVATION
CUM
824.27
CUM/H
120.00
0.25
171.38
171.38
2
BACKFILL
CUM
721.82
CUM/H
60.00
0.12
312.19
312.19
3
STRUCTURE CONCRETE: C40
CUM
95.92
CUM/H
3.00
0.30
118.30
4
BLINDING CONCRETE
CUM
15.50
CUM/H
0.30
51.68
5
CONCRETE SCREED
CUM
4.82
CUM/H
0.30
16.06
6
CONCRETE PROTECTION BELOW GRADE LEVEL
SQM
394.03
SQM/H
8.00
7
CONCRETE PROTECTION ABOVE GRADE LEVEL
SQM
77.02
SQM/H
8.00
9.63
8
0.25mm POLYETHYLENE SHEET
SQM
216.21
SQM/H
4.80
45.04
MARK
49.25
9
NON-SHRINK LEVELING GROUT
CUM
0.61
CUM/H
0.26
2.34
10
REINFORCEMENT BARS
TON
10.55
Kg/H
0.02
527.74
11
FORMWORKS
SQM
376.29
SQM/H
0.70
537.56
12
FORMWORKS REMOVAL
SQM
376.29
SQM/H
1.40
268.78
13
ANCHOR BOLTS:(GALVANISED)
14
M24 WITH 2 NUTS & PLAIN WASHERS
PCS
8.00
PCS/H
3.00
2.67
15
M20 WITH 2 NUTS & PLAIN WASHERS
PCS
244.00
PCS/H
3.00
81.33
16
M16 WITH 1 NUTS & PLAIN WASHERS
PCS
12.00
PCS/H
3.00
4.00
17
PAVING & GRADING
SQM
N/A
SQM/H
18
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
SQM
325.00
SQM/H
2.00
162.50
19
PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA
LM
25.00
LM/H
6.00
4.17
STRUCTURAL STEEL WORKS 1
STRUCTURAL STEEL FABRICATION
KG
22637.65
Kg/H
38
595.73
2
STRUCTURAL STEEL ERECTION
KG
22637.65
Kg/H
72
314.41
3
STEELGRATING:30x5mm BEARING BAR AT 30 PITCH
SQM
59.11
SQM/H
1.5
39.41
4
STEEL HANDRAIL
LM
80.36
LM/H
0.8
100.45
5
STEEL CAGED LADDER(7.3M HIGH)
SET
1
SET/H
0.01
108.00
6
STEEL LADDER(2.45M HIGH)
SET
2
SET/H
0.01
72.00
7
STEEL LADDER(1.5M HIGH)
SET
1
SET/H
0.03
36.00
125.76
Page 130 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHN DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL MACHIN ESTIMATE Y UNIT HOURS HAND E
SKILLED WORKER HOURS
LABOUR HOURS
8
BOL & NUTS WITH PLAIN WASHER
9
M16 WITH 2 NUTS & PLAIN WASHERS
PCS
176
PCS/H
8.00
22.00
22.00
10
M20WITH 2 NUTS & PLAIN WASHERS MECHANICAL SEPARATOR INSTALLATION PIPING TOTAL LENGTH Nos. of WELDS DIN (Fabrication) DIN (Erection) Nos. of RADIOGRAPHS TIE-INS SHUTDOWN TIE-INS NON SHUTDOWN PWHT ELECTRICAL Low Voltage cable cable gland earthing cable earth rod earth busbar exothermic weld (T-JOINT) and connector EARTH BOSS cable tray cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter
PCS
150
PCS/H
8.00
18.75
18.75
EA
1
EA/H
0.01
125.00
LM EA DIN DIN PC EA EA EA
565 500 1096.5 1096.5 2780 11 4 404
LM/H
1.20
470.83
DIN/H DIN/H FILM/H EA/H EA/H EA/H
3.00 1.50 4.00 0.01 0.01 0.67
365.50 731.00 695.00 1,232.00 448.00 602.99
LM PCS LM PCS PCS PCS PCS LM PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS
390 14 130 3 5 27 1 140 8 3 1 15 15 1 1 12 1 1
LM/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H
6.00 0.50 8.90 0.22 0.25 0.50 0.13 0.57 0.25
65.00 28.00 14.61 13.50 20.00 54.00 8.00 245.61 32.00
0.13 0.50 0.25 0.01 0.01 0.06 0.13 0.13
8.00 30.00 60.00 180.00 180.00 192.00 8.00 8.00
SET
6
SET/H
0.25
24.00
1 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1
MARK
65.00 14.61
Page 131 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHN DEGASSING STATION ITEM NUMBER 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
ACTIVITY DESCRIPTION tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS
SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS PCS PCS
SKILLED TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL WORKER MACHIN ESTIMATE Y UNIT HOURS HAND HOURS E 16.00 0.25 4 SET/H 12.00 0.25 3 SET/H 20.00 0.25 5 SET/H 10.00 0.50 5 SET/H 4.00 0.50 2 SET/H 40.00 0.13 5 SET/H 8.00 0.13 1 SET/H 15.00 0.20 3 SET/H 25.00 0.20 5 SET/H 25.00 0.20 5 SET/H 15.00 0.20 3 SET/H 8.00 0.13 1 SET/H 8.00 0.13 1 SET/H 16.00 0.13 2 SET/H 24.00 0.13 3 SET/H 8.00 0.13 1 SET/H 4.00 0.50 2 SET/H 96.00 0.13 12 PCS/H 833.00 6.00 4998 LM/H 286.00 0.50 143 PCS/H 33.33 0.57 19 LM/H 139.00 1.00 139 LM/H 92.00 1.00 92 PCS/H 27.00 8.00 216 SET/H 163.33 0.30 49 LM/H 110.00 0.20 22 LM/H 94.00 0.50 47 LM/H 95.00 2.00 190 PCS/H 11.00 2.00 22 PCS/H 10.67 3.00 32 PCS/H
SQM SQM SQM SQM
560.74 327.883384 85.875075 570.74
UNIT
SQM/H SQM/H SQM/H SQM/H
0.50 0.40 0.25 0.50
1,121.48 819.71 343.50 1,141.48
LABOUR HOURS
MARK
833.00 33.33
94.00
560.74 327.88 137.40 456.59
Page 132 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHN DEGASSING STATION ITEM NUMBER 1 2 3 1 2 3 4 1 2
ACTIVITY DESCRIPTION STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests
UNIT TON CUM EA
SKILLED TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL WORKER MACHIN ESTIMATE Y UNIT HOURS HAND HOURS E 48.00 382.92 18.38 Kg/H 1.00 29.39 29.3917 CUM/H 0.01 83.33 1 EA/H
SET SET SET SET
1 1 1 1
SET/H SET/H SET/H SET/H
0.00 0.01 0.00 0.00
400.00 200.00 400.00 400.00
SET SET
1 1
SET/H SET/H
0.00 0.00
800.00 640.00
LABOUR HOURS
MARK
191.46 29.39
Page 133 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHS DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT MACHIN Y UNIT HOURS HAND E E
SKILLED WORKER HOURS
LABOUR HOURS
MARK
CIVIL WORKS 1
EXCAVATION
CUM
779.46
CUM/H
120.00
0.25
162.06
162.06
2
BACKFILL
CUM
686.11
CUM/H
60.00
0.12
296.74
296.74
3
STRUCTURE CONCRETE: C40
CUM
87.87
CUM/H
3.00
0.30
108.37
4
BLINDING CONCRETE
CUM
14.45
CUM/H
0.30
48.18
5
CONCRETE SCREED
CUM
4.29
CUM/H
0.30
6
CONCRETE PROTECTION BELOW GRADE LEVEL
SQM
377.83
SQM/H
8.00
14.31 47.23
7
CONCRETE PROTECTION ABOVE GRADE LEVEL
SQM
72.37
SQM/H
8.00
9.05
8
0.25mm POLYETHYLENE SHEET
SQM
201.82
SQM/H
4.80
42.05
9
NON-SHRINK LEVELING GROUT
CUM
0.63
CUM/H
0.26
2.43
10
REINFORCEMENT BARS
TON
9.67
Kg/H
0.02
483.27
11
FORMWORKS
SQM
368.75
SQM/H
0.70
526.78
12
FORMWORKS REMOVAL
SQM
368.75
SQM/H
1.40
263.39
13
ANCHOR BOLTS:(GALVANISED)
14
M24 WITH 2 NUTS & PLAIN WASHERS
PCS
8.00
PCS/H
3.00
2.67
15
M20 WITH 2 NUTS & PLAIN WASHERS
PCS
272.00
PCS/H
3.00
90.67
16
M16 WITH 1 NUTS & PLAIN WASHERS
PCS
6.00
PCS/H
3.00
2.00
17
PAVING & GRADING
SQM
105.00
SQM/H
18
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
SQM
47.00
SQM/H
2.00
23.50
LM/H
6.00
4.50
19
PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA
LM
27.00
STRUCTURAL STEEL WORKS 1
STRUCTURAL STEEL FABRICATION
KG
18757.36
Kg/H
38
493.61
2
STRUCTURAL STEEL ERECTION
KG
18757.36
Kg/H
72
260.52
3
STEELGRATING:30x5mm BEARING BAR AT 30 PITCH
SQM
73.49
SQM/H
1.5
48.99
4
STEEL HANDRAIL
LM
93.37
LM/H
0.8
116.71
5
STEEL CAGED LADDER(5.8M HIGH)
SET
1
SET/H
0.01
108.00
6
STEEL LADDER(2.45M HIGH)
SET
1
SET/H
0.01
72.00
7
STEEL LADDER(1.5M HIGH)
SET
1
SET/H
0.03
36.00
104.21
Page 134 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHS DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT MACHIN Y UNIT HOURS HAND E E
SKILLED WORKER HOURS
LABOUR HOURS
8
BOL & NUTS WITH PLAIN WASHER
9
M16 WITH 2 NUTS & PLAIN WASHERS
PCS
169
PCS/H
8.00
21.13
21.13
10
M20WITH 2 NUTS & PLAIN WASHERS MECHANICAL SEPARATOR INSTALLATION PIPING TOTAL LENGTH Nos. of WELDS DIN (Fabrication) DIN (Erection) Nos. of RADIOGRAPHS TIE-INS SHUTDOWN TIE-INS NON SHUTDOWN PWHT ELECTRICAL Low Voltage cable cable gland earthing cable earth rod earth busbar exothermic weld (T-JOINT) and connector EARTH BOSS cable tray cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter
PCS
150
PCS/H
8.00
18.75
18.75
EA
1
EA/H
0.01
125.00
LM EA DIN DIN PC EA EA EA
490 318 1365 1365 2660 9 3 406
LM/H
1.20
408.33
DIN/H DIN/H FILM/H EA/H EA/H EA/H
3.00 1.50 4.00 0.01 0.01 0.67
455.00 910.00 665.00 1,008.00 336.00 605.97
LM PCS LM PCS PCS PCS PCS LM PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS
470 14 130 3 5 30 1 140 8 1 1 17 17 1 1 21 1 1
LM/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H LM/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H
6.00 0.50 8.90 0.22 0.25 0.50 0.13 0.57 0.25
78.33 28.00 14.61 13.50 20.00 60.00 8.00 245.61 32.00
0.13 0.50 0.25 0.01 0.01 0.06 0.13 0.13
8.00 34.00 68.00 180.00 180.00 336.00 8.00 8.00
SET
6
SET/H
0.25
24.00
1 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1
MARK
78.33 14.61
Page 135 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHS DEGASSING STATION ITEM NUMBER 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
ACTIVITY DESCRIPTION tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS
SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS PCS PCS
TOTAL SKILLED PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT WORKER MACHIN Y UNIT HOURS HAND E HOURS E 0.25 16.00 4 SET/H 0.25 12.00 3 SET/H 0.25 20.00 5 SET/H 0.50 10.00 5 SET/H 0.50 4.00 2 SET/H 0.13 40.00 5 SET/H 0.13 8.00 1 SET/H 0.20 15.00 3 SET/H 0.20 20.00 4 SET/H 0.20 20.00 4 SET/H 0.20 10.00 2 SET/H 0.13 8.00 1 SET/H 0.13 8.00 1 SET/H 0.13 16.00 2 SET/H 0.13 24.00 3 SET/H 0.13 8.00 1 SET/H 0.50 4.00 2 SET/H 0.13 96.00 12 PCS/H 6.00 457.00 2742 LM/H 0.50 278.00 139 PCS/H 0.57 33.33 19 LM/H 1.00 139.00 139 LM/H 1.00 92.00 92 PCS/H 8.00 27.00 216 SET/H 0.30 163.33 49 LM/H 0.20 110.00 22 LM/H 0.50 92.00 46 LM/H 2.00 94.50 189 PCS/H 2.00 11.00 22 PCS/H 3.00 12.33 37 PCS/H
SQM SQM SQM SQM
537.6 295.794 75.57007 547.6
UNIT
SQM/H SQM/H SQM/H SQM/H
0.50 0.40 0.25 0.50
1,075.20 739.48 302.28 1,095.20
LABOUR HOURS
MARK
457.00 33.33
92.00
537.60 295.79 120.91 438.08
Page 136 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR FAHS DEGASSING STATION ITEM NUMBER 1 2 3 1 2 3 4 1 2
ACTIVITY DESCRIPTION STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests
UNIT TON CUM EA
TOTAL SKILLED PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT WORKER MACHIN Y UNIT HOURS HAND E HOURS E 48.00 317.29 15.23 Kg/H 1.00 31.18 31.18001 CUM/H 0.01 83.33 1 EA/H
SET SET SET SET
1 1 1 1
SET/H SET/H SET/H SET/H
0.00 0.01 0.00 0.00
400.00 200.00 400.00 400.00
SET SET
1 1
SET/H SET/H
0.00 0.00
800.00 640.00
LABOUR HOURS
MARK
158.65 31.18
Page 137 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHM DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
PRODUCTIVITY TOTAL PRODUCTIVIT TOTAL ESTIMAT Y UNIT HOURS E MACHINE HAND
SKILLED WORKER HOURS
LABOUR HOURS
1
CIVIL WORKS EXCAVATION
CUM
803
CUM/H
120.00
0.25
167
167
2
BACKFILL
CUM
699
CUM/H
60.00
0.12
302
302
3
STRUCTURE CONCRETE: C40
CUM
98
CUM/H
3.00
0.30
121
121
4
BLINDING CONCRETE
CUM
17
CUM/H
0.30
58
58
5
CONCRETE SCREED
CUM
4
CUM/H
0.30
15
15
6
CONCRETE PROTECTION BELOW GRADE LEVEL
SQM
380
SQM/H
8.00
47
47
7
CONCRETE PROTECTION ABOVE GRADE LEVEL
SQM
84
SQM/H
8.00
10
10
8
0.25mm POLYETHYLENE SHEET
SQM
264
SQM/H
4.80
55
55
9
NON-SHRINK LEVELING GROUT
CUM
1
CUM/H
0.26
2
2
10
REINFORCEMENT BARS
TON
11
Kg/H
0.02
539
539
11
FORMWORKS
SQM
377
SQM/H
0.70
538
538
12
FORMWORKS REMOVAL
SQM
SQM/H
1.40
0
0
13
ANCHOR BOLTS:(GALVANISED)
14
M24 WITH 2 NUTS & PLAIN WASHERS
PCS
8
PCS/H
3.00
3
3
15
M20 WITH 2 NUTS & PLAIN WASHERS
PCS
236
PCS/H
3.00
79
79
16
M16 WITH 1 NUTS & PLAIN WASHERS
PCS
12
PCS/H
3.00
4
4
17
PAVING & GRADING
SQM
N/A
SQM/H
18
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
SQM
210
SQM/H
2.00
105
105
19
PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA
LM
30
LM/H
6.00
5
5
20
NEW SOAKAWAY PIT (STANDARD SIZE)
SET
1
SET/H
0.00
224
224
MARK
STRUCTURAL STEEL WORKS 1
STRUCTURAL STEEL FABRICATION
KG
16126.03
Kg/H
38
424
424
2
STRUCTURAL STEEL ERECTION
KG
16126.03
Kg/H
72
224
134
3
STEELGRATING:30x5mm BEARING BAR AT 30 PITCH
SQM
59.11
SQM/H
1.5
39
39
4
STEEL HANDRAIL
LM
80.36
LM/H
0.8
100
100
5
STEEL CAGED LADDER(7.3M HIGH)
SET
1
SET/H
0.01
108
108
90
Page 138 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHM DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
PRODUCTIVITY TOTAL PRODUCTIVIT TOTAL ESTIMAT Y UNIT HOURS E MACHINE HAND
SKILLED WORKER HOURS
6
STEEL LADDER(2.45M HIGH)
SET
2
SET/H
0.01
72
72
7
STEEL LADDER(1.5M HIGH)
SET
1
SET/H
0.03
36
36
8
BOLT & NUTS WITH PLAIN WASHER
LABOUR HOURS
9
M16 WITH 2 NUTS & PLAIN WASHERS
PCS
144
PCS/H
8.00
18
18
10
M20WITH 2 NUTS & PLAIN WASHERS
PCS
150
PCS/H
8.00
19
19
EA
1
EA/H
0.01
125
125
LM/H
1.20
335
335
MARK
MECHANICAL 1
SEPARATOR INSTALLATION PIPING
1
TOTAL LENGTH
LM
402
2
Nos. of WELDS
EA
606
3
DIN (Fabrication)
DIN
1624
DIN/H
3.00
541
541
4
DIN (Erection)
DIN
1624
DIN/H
1.50
1083
1083
5
Nos. of RADIOGRAPHS
PC
2881
FILM/H
4.00
720
720
6
TIE-INS SHUTDOWN
EA
9
EA/H
0.01
1008
1008
7
TIE-INS NON SHUTDOWN
EA
9
EA/H
0.01
1008
1008
8
PWHT
EA
420
EA/H
0.67
627
627
ELECTRICAL 1
Low Voltage cable
2
cable gland
LM
1060
LM/H
6.00
177
PCS
14
PCS/H
0.50
28
177 28
3
earthing cable
LM
130
LM/H
8.90
15
4
earth rod
PCS
3
PCS/H
0.22
14
5
earth busbar
PCS
5
PCS/H
0.25
20
20
6
exothermic weld (T-JOINT) and connector
PCS
28
PCS/H
0.50
56
56
7 8 9 10 11
EARTH BOSS cable tray cable tray elbow cable tray tee welding socket
PCS LM PCS PCS PCS
1 140 7 0 1
PCS/H LM/H PCS/H PCS/H PCS/H
0.13 0.57 0.25
8 246 28
0.13
8
8 246 28 0 8
15 14
Page 139 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHM DEGASSING STATION ITEM NUMBER 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
ACTIVITY DESCRIPTION lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate
UNIT
PRODUCTIVITY TOTAL PRODUCTIVIT TOTAL ESTIMAT Y UNIT HOURS E MACHINE HAND
PCS PCS PCS PCS PCS PCS PCS
16 16 1 1 14 1 1
PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H
0.50 0.25 0.01 0.01 0.06 0.13 0.13
32 64 180 180 224 8 8
SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS
6 4 3 5 5 2 5 1 3 5 5 3 1 3 1 2 12 5016 143 19 139 92 237 49 22 46 189
SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H PCS/H LM/H PCS/H LM/H LM/H PCS/H SET/H LM/H LM/H LM/H PCS/H
0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20 0.20 0.20 0.13 0.13 0.13 0.50 0.13 6.00 0.50 0.57 1.00 1.00 8.00 0.30 0.20 0.50 2.00
24 16 12 20 10 4 40 8 15 25 25 15 8 24 8 4 96 836 286 33 139 92 30 163 110 92 95
SKILLED WORKER HOURS
LABOUR HOURS
MARK
32 64 180 180 224 8 8 0 24 16 12 20 10 4 40 8 15 25 25 15 8 24 8 4 96 836 286 33 139 92 30 163 110 92 95
Page 140 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHM DEGASSING STATION ITEM NUMBER 28 29 1 2 3 4 1 2 3 1 2 3 4 1 2
ACTIVITY DESCRIPTION sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests
UNIT
PRODUCTIVITY TOTAL PRODUCTIVIT TOTAL ESTIMAT Y UNIT HOURS E MACHINE HAND
SKILLED WORKER HOURS
LABOUR HOURS
PCS PCS
22 32
PCS/H PCS/H
2.00 3.00
11 11
11 11
SQM SQM SQM SQM
467.78 259.2209 39.84603 477.78
SQM/H SQM/H SQM/H SQM/H
0.50 0.40 0.25 0.50
936 648 159 956
468 389 96 573
468 259 64 382
TON CUM EA
13.08 35.32539 1
Kg/H CUM/H EA/H
48.00 1.00 0.01
273 35 83
136
136 35
SET SET SET SET
1 1 1 1
SET/H SET/H SET/H SET/H
0.00 0.01 0.00 0.00
400 200 400 400
400 200 400 400
SET SET
1 1
SET/H SET/H
0.00 0.00
800 640
800 640
MARK
83
Page 141 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHN DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
TOTAL PRODUCTIVIT ESTIAMTED Y UNIT
PRODUCTIVITY MACHINE
HAND
TOTAL HOURS
SKILLED WORKER HOURS
LABOUR HOURS
1
CIVIL WORKS EXCAVATION
CUM
835.979324
CUM/H
120.00
0.25
173.81
173.81
2
BACKFILL
CUM
1180.95126
CUM/H
60.00
0.12
510.76
510.76
3
STRUCTURE CONCRETE: C40
CUM
98.263
CUM/H
3.00
0.30
121.19
4
BLINDING CONCRETE
CUM
15.783
CUM/H
0.30
52.61
5
CONCRETE SCREED
CUM
4.936
CUM/H
0.30
6
CONCRETE PROTECTION BELOW GRADE LEVEL
SQM
396.35
SQM/H
8.00
MARK
16.45 49.54
7
CONCRETE PROTECTION ABOVE GRADE LEVEL
SQM
77.033
SQM/H
8.00
9.63
8
0.25mm POLYETHYLENE SHEET
SQM
218.179
SQM/H
4.80
45.45
9
NON-SHRINK LEVELING GROUT
CUM
0.62025
CUM/H
0.26
2.39
10
REINFORCEMENT BARS
TON
10.81
Kg/H
0.02
540.50
11
FORMWORKS
SQM
376.223
SQM/H
0.70
537.46
12
FORMWORKS REMOVAL
SQM
376.223
SQM/H
1.40
268.73
13
ANCHOR BOLTS:(GALVANISED)
14
M24 WITH 2 NUTS & PLAIN WASHERS
PCS
8
PCS/H
3.00
2.67
15
M20 WITH 2 NUTS & PLAIN WASHERS
PCS
220
PCS/H
3.00
73.33
16
M16 WITH 1 NUTS & PLAIN WASHERS
PCS
12
PCS/H
3.00
4.00
17
PAVING & GRADING
SQM
198
SQM/H
18
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
SQM
12
SQM/H
2.00
6.00
19
PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA
LM
1
LM/H
6.00
0.17
STRUCTURAL STEEL WORKS 1
STRUCTURAL STEEL FABRICATION
KG
20727.07
Kg/H
38
545.45
2
STRUCTURAL STEEL ERECTION
KG
20727.07
Kg/H
72
287.88
3
STEELGRATING:30x5mm BEARING BAR AT 30 PITCH
SQM
59.11
SQM/H
1.5
39.41
4
STEEL HANDRAIL
LM
80.36
LM/H
0.8
100.45
5
STEEL CAGED LADDER(7.3M HIGH)
SET
1
SET/H
0.01
108.00
6
STEEL LADDER(2.45M HIGH)
SET
2
SET/H
0.01
72.00
115.15
Page 142 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHN DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
7
STEEL LADDER(1.5M HIGH)
8
BOL & NUTS WITH PLAIN WASHER
9
M16 WITH 2 NUTS & PLAIN WASHERS
10
M20WITH 2 NUTS & PLAIN WASHERS
UNIT
TOTAL PRODUCTIVIT ESTIAMTED Y UNIT
PRODUCTIVITY MACHINE
HAND
TOTAL HOURS
SKILLED WORKER HOURS
LABOUR HOURS
1
SET/H
0.03
36.00
PCS
168
PCS/H
8.00
21.00
21.00
PCS
150
PCS/H
8.00
18.75
18.75
EA
1
EA/H
0.01
125.00
LM/H
1.20
499.17
SET
MARK
MECHANICAL 1
SEPARATOR INSTALLATION PIPING
1
TOTAL LENGTH
LM
599
2
Nos. of WELDS
EA
730
3
DIN (Fabrication)
DIN
1857
DIN/H
3.00
619.00
4
DIN (Erection)
DIN
1857
DIN/H
1.50
1,238.00
5
Nos. of RADIOGRAPHS
PC
3254
FILM/H
4.00
813.50
6
TIE-INS SHUTDOWN
EA
15
EA/H
0.01
1,680.00
7
TIE-INS NON SHUTDOWN
EA
3
EA/H
0.01
336.00
8
PWHT
EA
457
EA/H
0.67
682.09
ELECTRICAL 1
Low Voltage cable
2
cable gland
3
earthing cable
4
earth rod
LM
700
LM/H
6.00
116.67
PCS
14
PCS/H
0.50
28.00
LM
130
LM/H
8.90
14.61
PCS
3
PCS/H
0.22
13.50
5
earth busbar
PCS
3
PCS/H
0.25
12.00
6
exothermic weld (T-JOINT) and connector
PCS
29
PCS/H
0.50
58.00
7 8 9 10 11 12 13
EARTH BOSS cable tray cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes
PCS LM PCS PCS PCS PCS PCS
1 140 5 0 1 15 15
PCS/H LM/H PCS/H PCS/H PCS/H PCS/H PCS/H
0.13 0.57 0.25
8.00 245.61 20.00
0.13 0.50 0.25
8.00 30.00 60.00
116.67 14.61
Page 143 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHN DEGASSING STATION ITEM NUMBER 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
ACTIVITY DESCRIPTION conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel hot galvanizing pipe steel plate
UNIT
TOTAL PRODUCTIVIT ESTIAMTED Y UNIT
PRODUCTIVITY MACHINE
HAND
TOTAL HOURS
SKILLED WORKER HOURS
PCS PCS PCS PCS PCS
1 1 10 1 1
PCS/H PCS/H PCS/H PCS/H PCS/H
0.01 0.01 0.06 0.13 0.13
180.00 180.00 160.00 8.00 8.00
SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS
6 4 3 5 5 2 5 1 3 5 5 3 1 1 2 3 1 2 12 6192 139 19 143 92 237 49 22 14 189
SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H PCS/H LM/H PCS/H LM/H LM/H PCS/H SET/H LM/H LM/H LM/H PCS/H
0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20 0.20 0.20 0.13 0.13 0.13 0.13 0.13 0.50 0.13 6.00 0.50 0.57 1.00 1.00 8.00 0.30 0.20 0.50 2.00
24.00 16.00 12.00 20.00 10.00 4.00 40.00 8.00 15.00 25.00 25.00 15.00 8.00 8.00 16.00 24.00 8.00 4.00 96.00 1,032.00 278.00 33.33 143.00 92.00 29.63 163.33 110.00 28.00 94.50
LABOUR HOURS
MARK
1,032.00 33.33
28.00
Page 144 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHN DEGASSING STATION ITEM NUMBER 30 31 1 2 3 4 1 2 3 1 2 3 4 1 2
ACTIVITY DESCRIPTION sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests
UNIT
TOTAL PRODUCTIVIT ESTIAMTED Y UNIT
PRODUCTIVITY MACHINE
HAND
TOTAL HOURS
SKILLED WORKER HOURS
LABOUR HOURS
PCS PCS
22 32
PCS/H PCS/H
2.00 3.00
11.00 10.67
SQM SQM SQM SQM
526.65 410.817787 57.7080504 536.65
SQM/H SQM/H SQM/H SQM/H
0.50 0.40 0.25 0.50
1,053.30 1,027.04 230.83 1,073.30
526.65 410.82 92.33 429.32
TON CUM EA
16.82 29.3943 1
Kg/H CUM/H EA/H
48.00 1.00 0.01
350.42 29.39 83.33
175.21 29.39
SET SET SET SET
1 1 1 1
SET/H SET/H SET/H SET/H
0.00 0.01 0.00 0.00
400.00 200.00 400.00 400.00
SET SET
1 1
SET/H SET/H
0.00 0.00
800.00 640.00
MARK
Page 145 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHS DEGASSING STATION ITEM NUMBE R
ACTIVITY DESCRIPTION
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED
SKILLED WORKER HOURS
1
CIVIL WORKS EXCAVATION
CUM
684.62
CUM/H
120.00
0.25
142
2
BACKFILL
CUM
598.57
CUM/H
60.00
0.12
259
3
STRUCTURE CONCRETE: C40
CUM
82.19
CUM/H
3.00
0.30
101
101
4
BLINDING CONCRETE
CUM
13.25
CUM/H
0.30
44
44
5
CONCRETE SCREED
CUM
3.90
CUM/H
0.30
13
13
6
CONCRETE PROTECTION BELOW GRADE LEVEL
SQM
330.90
SQM/H
8.00
41
41
7
CONCRETE PROTECTION ABOVE GRADE LEVEL
SQM
72.48
SQM/H
8.00
9
9
8
0.25mm POLYETHYLENE SHEET
SQM
187.87
SQM/H
4.80
39
39
LABOUR HOURS
MARK
142 259
9
NON-SHRINK LEVELING GROUT
CUM
0.54
CUM/H
0.26
2
2
10
REINFORCEMENT BARS
TON
9.04
Kg/H
0.02
452
452
11
FORMWORKS
SQM
328.77
SQM/H
0.70
470
470
12
FORMWORKS REMOVAL
SQM
328.77
SQM/H
1.40
235
235
13
ANCHOR BOLTS:(GALVANISED)
14
M24 WITH 2 NUTS & PLAIN WASHERS
PCS
8.00
PCS/H
3.00
3
3
15
M20 WITH 2 NUTS & PLAIN WASHERS
PCS
204.00
PCS/H
3.00
68
68
16
M16 WITH 1 NUTS & PLAIN WASHERS
PCS
12.00
PCS/H
3.00
4
4
17
PAVING & GRADING
SQM
52.00
SQM/H
18
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
SQM
12.00
SQM/H
2.00
6
6
19
PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA
LM
1.00
LM/H
6.00
0
0
STRUCTURAL STEEL WORKS 1
STRUCTURAL STEEL FABRICATION
KG
16301.85
Kg/H
38
429
429
2
STRUCTURAL STEEL ERECTION
KG
16301.85
Kg/H
72
226
136
3
STEELGRATING:30x5mm BEARING BAR AT 30 PITCH
SQM
59.11
SQM/H
1.5
39
39
4
STEEL HANDRAIL
LM
80.36
LM/H
0.8
100
100
5
STEEL CAGED LADDER(7.3M HIGH)
SET
1
SET/H
0.01
108
108
6
STEEL LADDER(2.45M HIGH)
SET
2
SET/H
0.01
72
72
7
STEEL LADDER(1.5M HIGH)
SET
1
SET/H
0.03
36
36
91
Page 146 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHS DEGASSING STATION ITEM ACTIVITY DESCRIPTION NUMBE R 8 BOLT & NUTS WITH PLAIN WASHER
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT MACHINE HAND HOURS ED
SKILLED WORKER HOURS
LABOUR HOURS
9
M16 WITH 2 NUTS & PLAIN WASHERS
PCS
168
PCS/H
8.00
21
21
10
M20WITH 2 NUTS & PLAIN WASHERS
PCS
150
PCS/H
8.00
19
19
EA
1
EA/H
0.01
125
125
LM/H
1.20
461
461
MARK
MECHANICAL 1
SEPARATOR INSTALLATION PIPING
1
TOTAL LENGTH
LM
553
2
Nos. of WELDS
EA
815
3
DIN (Fabrication)
DIN
1742
DIN/H
3.00
581
581
4
DIN (Erection)
DIN
1742
DIN/H
1.50
1161
1161
5
Nos. of RADIOGRAPHS
PC
3129
FILM/H
4.00
782
782
6
TIE-INS SHUTDOWN
EA
12
EA/H
0.01
1344
1344
7
TIE-INS NON SHUTDOWN
EA
4
EA/H
0.01
448
448
8
PWHT
EA
436
EA/H
0.67
651
651
ELECTRICAL 1
Low Voltage cable
2
cable gland
3
earthing cable
4
earth rod
5
earth busbar
6
exothermic weld (T-JOINT) and connector
7
EARTH BOSS
8
cable tray
9 10 11 12 13 14 15
cable tray elbow cable tray tee welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials
LM
500
LM/H
6.00
83
PCS
14
PCS/H
0.50
28
LM
130
LM/H
8.90
15
PCS
3
PCS/H
0.22
14
PCS
3
PCS/H
0.25
12
12
PCS
29
PCS/H
0.50
58
58
PCS
1
PCS/H
0.13
8
8
LM
140
LM/H
0.57
246
246
PCS PCS PCS PCS PCS PCS PCS
9 3 1 15 15 1 1
PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H
0.25
36
0.13 0.50 0.25 0.01 0.01
8 30 60 180 180
36 0 8 30 60 180 180
83 28 15 14
Page 147 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHS DEGASSING STATION ITEM ACTIVITY DESCRIPTION NUMBE R 16 concrete duck bank(sulphate resistant) 17 junction box for fed lighting 18 junction box for fed AC UPS loads INSTRUMENTATION 1 pressure transmitter 2 tempreture transmitter 3 flow transmitter 4 level transmitter 5 pressure guage 6 tempreture guage 7 control valve 8 cut off valve 9 restriction orifice 10 flammable gas detector 11 toxic gas detector 12 infrared radiation flame detector 13 manual call point 14 sounder 15 beacon 16 relief valve 17 analyzer transmitter 18 level guage 19 junction box 20 cable 21 cable gland 22 cable tray 23 stainless tube 24 pipe fittings 25 bolts/nuts 26 hot galvanizing angle steel 27 hot galvanizing channel steel 28 hot galvanizing pipe 29 steel plate 30 sunshade 31 nameplate COATING & FIREPROOFING
UNIT PCS PCS PCS SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM LM PCS PCS PCS
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT MACHINE HAND HOURS ED 0.06 8 PCS/H 128 0.13 1 PCS/H 8 0.13 1 PCS/H 8 6 4 3 5 5 2 5 1 3 5 5 3 1 1 2 3 1 2 12 2790 139 19 139 92 237 49 22 14 189 22 32
SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H PCS/H LM/H PCS/H LM/H LM/H PCS/H SET/H LM/H LM/H LM/H PCS/H PCS/H PCS/H
0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20 0.20 0.20 0.13 0.13 0.13 0.13 0.13 0.50 0.13 6.00 0.50 0.57 1.00 1.00 8.00 0.30 0.20 0.50 2.00 2.00 3.00
24 16 12 20 10 4 40 8 15 25 25 15 8 8 16 24 8 4 96 465 278 33 139 92 30 163 110 28 95 11 11
SKILLED WORKER HOURS 128 8 8 0 24 16 12 20 10 4 40 8 15 25 25 15 8 8 16 24 8 4 96
LABOUR HOURS
MARK
465 278 33 139 92 30 163 110 28 95 11 11
Page 148 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR KAHS DEGASSING STATION ITEM NUMBE R 1 2 3 4 1 2 3 1 2 3 4 1 2
ACTIVITY DESCRIPTION STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests
UNIT SQM SQM SQM SQM
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT MACHINE HAND HOURS ED 0.50 442.5 SQM/H 885 0.40 337.0503 SQM/H 843 0.25 83.81407 SQM/H 335 0.50 452.5 SQM/H 905
SKILLED WORKER HOURS 443 506 201 543
TON CUM EA
12 29.3943 1
Kg/H CUM/H EA/H
48.00 1.00 0.01
250 29 83
125
SET SET SET SET
1 1 1 1
SET/H SET/H SET/H SET/H
0.00 0.01 0.00 0.00
400 200 400 400
400 200 400 400
SET SET
1 1
SET/H SET/H
0.00 0.00
800 640
800 640
LABOUR HOURS
MARK
443 337 134 362 125 29
83
Page 149 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR JALM DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED
SKILLED WORKER HOURS
LABOUR HOURS
1
CIVIL WORKS EXCAVATION
CUM
758.57
CUM/H
120.00
0.25
158
158
2
BACKFILL
CUM
662.96
CUM/H
60.00
0.12
287
287
3
STRUCTURE CONCRETE: C40
CUM
91.17
CUM/H
3.00
0.30
112
112
4
BLINDING CONCRETE
CUM
14.33
CUM/H
0.30
48
48
5
CONCRETE SCREED
CUM
4.36
CUM/H
0.30
15
15
6
CONCRETE PROTECTION BELOW GRADE LEVEL
SQM
370.43
SQM/H
8.00
46
46
7
CONCRETE PROTECTION ABOVE GRADE LEVEL
SQM
76.28
SQM/H
8.00
10
10
8
0.25mm POLYETHYLENE SHEET
SQM
204.36
SQM/H
4.80
43
43
9
NON-SHRINK LEVELING GROUT
CUM
0.64
CUM/H
0.26
2
2
10
REINFORCEMENT BARS
TON
10.03
Kg/H
0.02
501
501
11
FORMWORKS
SQM
364.75
SQM/H
0.70
521
521
12
FORMWORKS REMOVAL
SQM
364.75
SQM/H
1.40
261
261
13
ANCHOR BOLTS:(GALVANISED)
14
M24 WITH 2 NUTS & PLAIN WASHERS
PCS
8.00
PCS/H
3.00
3
3
15
M20 WITH 2 NUTS & PLAIN WASHERS
PCS
220.00
PCS/H
3.00
73
73
16
M16 WITH 1 NUTS & PLAIN WASHERS
PCS
4.00
PCS/H
3.00
1
1
17
PAVING & GRADING
SQM
185.00
SQM/H
18
RE-INSTATEMENT OF EXISTING PAVEMENT (INTERLOCK PAVING)
SQM
24.00
SQM/H
2.00
12
12
19
PVC DRAINAGE PIPE LAID UNDERGROUND, 200mm DIA
LM
305.00
LM/H
6.00
51
51
20
CONCRETE KERB (RETAINING WALL & CULVERT)
CUM
90.00
CUM/H
0.42
214
214
MARK
STRUCTURAL STEEL WORKS 1
STRUCTURAL STEEL FABRICATION
KG
16529.77
Kg/H
38
435
435
2
STRUCTURAL STEEL ERECTION
KG
16529.77
Kg/H
72
230
138
3
STEELGRATING:30x5mm BEARING BAR AT 30 PITCH
SQM
64.24
SQM/H
1.5
43
43
4
STEEL HANDRAIL
LM
72.84
LM/H
0.8
91
91
5
STEEL CAGED LADDER(7.3M HIGH)
SET
0
SET/H
0.01
108
108
92
Page 150 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR JALM DEGASSING STATION ITEM NUMBER
ACTIVITY DESCRIPTION
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED
SKILLED WORKER HOURS
6
STEEL LADDER(2.45M HIGH)
SET
0
SET/H
0.01
72
7
STEEL LADDER(1.5M HIGH)
SET
0
SET/H
0.03
36
36
8
CRASH BARRIER
LM
51.6
LM/H
0.25
206
206
LABOUR HOURS
MARK
72
9
BOLT & NUTS WITH PLAIN WASHER
10
M16 WITH 2 NUTS & PLAIN WASHERS
PCS
169
PCS/H
8.00
21
21
11
M20WITH 2 NUTS & PLAIN WASHERS
PCS
150
PCS/H
8.00
19
19
EA
1
EA/H
0.01
125
125
LM/H
1.20
592
592
MECHANICAL 1
SEPARATOR INSTALLATION PIPING
1
TOTAL LENGTH
LM
710
2
Nos. of WELDS
EA
1640
3
DIN (Fabrication)
DIN
1673
DIN/H
3.00
558
558
4
DIN (Erection)
DIN
1673
DIN/H
1.50
1115
1115
5
Nos. of RADIOGRAPHS
PC
3772
FILM/H
4.00
943
943
6
TIE-INS SHUTDOWN
EA
16
EA/H
0.01
1792
1792
7
TIE-INS NON SHUTDOWN
EA
2
EA/H
0.01
224
224
8
PWHT
EA
564
EA/H
0.67
842
842
ELECTRICAL 1
Low Voltage cable
2
cable gland
LM
1550
LM/H
6.00
258
PCS
14
PCS/H
0.50
28
258 28
3
earthing cable
LM
130
LM/H
8.90
15
4
earth rod
PCS
4
PCS/H
0.22
18
18
5
earth busbar
PCS
23
PCS/H
0.25
92
92
6
exothermic weld (T-JOINT) and connector
PCS
1
PCS/H
0.50
2
2
7
EARTH BOSS
PCS
1
PCS/H
0.13
8
8
8
cable tray
LM
140
LM/H
0.57
246
246
9 10
cable tray elbow cable tray tee
PCS PCS
6 1
PCS/H PCS/H
0.25
24
24 0
15
Page 151 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR JALM DEGASSING STATION ITEM NUMBER 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
ACTIVITY DESCRIPTION welding socket lighting lighting circuits distribution junction boxes conduits,fittings,cable lugs,etc cable installation materials concrete duck bank(sulphate resistant) junction box for fed lighting junction box for fed AC UPS loads INSTRUMENTATION pressure transmitter tempreture transmitter flow transmitter level transmitter pressure guage tempreture guage control valve cut off valve restriction orifice flammable gas detector toxic gas detector infrared radiation flame detector manual call point sounder beacon relief valve analyzer transmitter level guage junction box cable cable gland cable tray stainless tube pipe fittings bolts/nuts hot galvanizing angle steel hot galvanizing channel steel
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED
PCS PCS PCS PCS PCS PCS PCS PCS
1 14 14 1 1 18 1 1
PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H PCS/H
0.13 0.50 0.25 0.01 0.01 0.06 0.13 0.13
8 28 56 180 180 288 8 8
SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET SET PCS LM PCS LM LM PCS SET LM LM
6 4 3 5 5 2 5 1 3 5 5 3 1 1 2 3 1 2 12 6516 143 19 139 92 216 49 22
SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H SET/H PCS/H LM/H PCS/H LM/H LM/H PCS/H SET/H LM/H LM/H
0.25 0.25 0.25 0.25 0.50 0.50 0.13 0.13 0.20 0.20 0.20 0.20 0.13 0.13 0.13 0.13 0.13 0.50 0.13 6.00 0.50 0.57 1.00 1.00 8.00 0.30 0.20
24 16 12 20 10 4 40 8 15 25 25 15 8 8 16 24 8 4 96 1086 286 33 139 92 27 163 110
SKILLED WORKER HOURS
LABOUR HOURS
MARK
8 28 56 180 180 288 8 8 0 24 16 12 20 10 4 40 8 15 25 25 15 8 8 16 24 8 4 96 1086 286 33 139 92 27 163 110
Page 152 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
CONSTRUCTION PRODUCTIVITY AND REQUIRED MANHOURS FOR JALM DEGASSING STATION ITEM NUMBER 28 29 30 31 1 2 3 4 1 2 3 4 1 2 3 4 1 2
ACTIVITY DESCRIPTION hot galvanizing pipe steel plate sunshade nameplate COATING & FIREPROOFING STEEL STRUCTURE COATING PIPING EXTERNAL COATING PIPING INTERNAL COATING FIREPROOF DEMOLISHING WORKS STEEL STRUCTURE DEMOLISHING WORKS CONCRETE DEMOLISHING WORKS EXCAVATION FOR CONCRETE KERB (RETAINING WALL & CULVERT) SEPARATOR DEMONISHING WORK PRECOMMISSIONING Systematic conformity checks Static, de-energized tests of specific equipment Pressure, vacuum and leak tests Clerance of the punch list COMMISSIONING Functional Testing Performance Tests
UNIT
TOTAL PRODUCTIVIT PRODUCTIVITY TOTAL ESTIMAT Y UNIT HOURS MACHINE HAND ED
SKILLED WORKER HOURS
LABOUR HOURS
LM PCS PCS PCS
46 208 22 32
LM/H PCS/H PCS/H PCS/H
0.50 2.00 2.00 3.00
92 104 11 11
104 11 11
SQM SQM SQM SQM
461.37 441.4491 67.68895 471.37
SQM/H SQM/H SQM/H SQM/H
0.50 0.40 0.25 0.50
923 1104 271 943
461 662 162 566
461 441 108 377
TON CUM CUM EA
13.42 28.46599 345 1
Kg/H CUM/H CUM/H EA/H
48.00 1.00 1.00 0.01
280 28 345 83
140
140 28
SET SET SET SET
1 1 1 1
SET/H SET/H SET/H SET/H
0.00 0.01 0.00 0.00
400 200 400 400
400 200 400 400
SET SET
1 1
SET/H SET/H
0.00 0.00
800 640
800 640
MARK
92
345 83
Page 153 of 170
PROJECT PLANNING PACKAGE
Attachment 14
INVOICE FORMAT
Page 154 of 170
EPIC FOR REPLACEMENT OF OLD 3‐PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN (PROJECT NO. 3963)
INVOICE Part 1 1.1
Invoice No.
XXXXX
1.3
Vendor Number
XXXXX
1.2 Date 1‐May‐17
29‐Jun‐17
1.4
Period of work done/ invoiced : From :
1.5
Contract No.
End :
28‐Jun‐17
1.6
Contract Title
1.7
Release Order No
XXXXX
1.8
Service Entry Sheet No:
XXXXX
2.1
Original Contract Value
2.2
Variations if Any (+/‐)
‐
2.3
Current Contract Value
43,453,804.00 QR
3.1
Total Advance Paid:
‐
QR
3.2
Advance recovered till last Invoice
‐
QR
3.3
Balance advance to be recovered as of date
‐
QR
4.1
Cummulative Value of work done/ Invoiced as of date
‐
QR
4.2
Less : Value of work done upto last invoice
‐
QR
4.3
Gross value of work done as per this invoice
‐
QR
5.1
Gross Value of work done as per this invoice
‐
QR
5.2
Less : Advance
‐
QR
5.3
Less : Retention as per this Invoice
‐
QR
5.4
Less : Liquidated Damages as per this Invoice
‐
QR
5.5
Net amount claimed as per this Invoice
‐
QR
5.6
Amount in Words :
01
GC16101100
EPIC FOR REPLACING OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN
Part 2 43,453,804.00 QR QR
Part 3
Part 4
Part 5
QATAR RIYALS FOUR HUNDRED TWO THOUSAND THREE HUNDRED SIXTY EIGHT AND TWENTY TWO DHIRAMS ONLY
Part 6 6.1 6.2 6.3
Authorized Signature Name of Authorized Signatory Designation
Company seal
Page 155 of 170
GC16101100 EPIC FOR REPLACING OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DUKHAN SUMMARY
Item 2.2.1.1 1 2 3 4 5 2.2.1.4.2.d 6 2.2.2 7
METHODOLOGY OF PAYMENT Cummulative till last Invoice LUMP SUM FOR THE LUMP SUM AMOUNT ITEM DESCRIPTION AMOUNT (QAR) % progress Amount QR. (QAR) App B Part 1 clause 2.2.1.1 Ninety five percent 95% of the LUMP PRICE portion is based on physical progress for the month Preliminaries & General Matters 6,039,699.00 5,737,714.05 Detailed Engineering 1,602,400.00 1,522,280.00 Procurement 26,216,175.00 20,972,940.00 Construction 8,446,830.00 8,024,488.50 Pre‐Commissioning, Commissioning & Operational Testing 1,148,700.00 1,091,265.00 Full value of Procurement Full value of Procurement Completion of the commissioning and 5,243,235.00 testing for the WORK excluding project dossier and As‐built drawings Completion of following activities / deliverables: Completion of SPIR, SAP,CMMS and Handing over of Spare parts, As‐Built drawings, 861,881.45 Project Dossiers, Close out report, Asset Capitalization Schedule TOTAL (DETAILED ENGINEERING DESIGN) 43,453,804.00 43,453,804.00 0.00% ‐
2 of 16
This Invoice % progress
Amount QR.
0.00% ‐
Date: Cummulative upto this invoice % progress
Amount QR.
0.00% ‐
Page 156 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING (PROJECT NO. 3963) Cost (QR) Level‐2 Level‐3 457,603.00 157,248.00
OVERALL Preliminaries Article 11.7 : Performance Bond Appendix ‐ C : Insurance Specific to the Contract
Cummulative till last Invoice % progress Amount QR.
This Invoice % progress
Amount QR.
Cummulative upto this invoice % progress Amount QR.
300,355.00
GENERAL MATTERS 5,582,096.00 Mobilisation of all supervision, labour, plant, materials and equipment necessary for the proper 391,323.00 execution of the WORK. De‐mobilisation of all supervision, labour, plant, materials and equipment necessary for the proper 201,013.00 execution of the WORK. WORKSITE Facilities and Utilities Provision, maintenance and subsequently removal of all temporary office, site facilities and utilities at WORKSITE for CONTRACTOR and SUBCONTRACTOR 1,958,130.00 personnel as required for the COMPLETION of the WORK. Provision of project planning/management, QA/QC activities, proprietary design softwares, liasion and all office overhead necessary for the proper execution of the WORK.
1,870,087.00
Provision of all temporary works as required for the COMPLETION of the WORK.
651,626.00
Provision of compliance with CONTRACT terms and conditions regarding obtaining QP permit to WORK, entry permit, ID cards, Inductions, Safetywear etc.
286,317.00
Provision of progress and safety meeting with QP.
44,790.00
Provision of Asset Capitalization Schedule Compilation and entry of required data for all supplied items in QP's computerised Maintenance Management System (CMMS) Provision for Digital Data for GIS as described in the CONTRACT. Provision of Project Dossiers includung As‐Built Drawings, Construction Data Books, and start ‐up, Operation and Maintenance Manuals as described in the CONTRACT. Total 6,039,699.00
30,457.00
Progress Percentage Calculation for Preliminaries and General Matters as per Appendix B Clause 2.0 DESIGN & DETAILED ENGINEERING PROCUREMENT CONSTRUCTION PRE-COMMISSIONING & COMMISSIONING
% Progress of Preliminaries
Schedule Price
1,602,400.00 26,216,175.00 8,446,830.00 1,148,700.00 Total 37,414,105.00
64,641.00 20,069.00
63,643.00
Progress as on date
‐ ‐ ‐ ‐ ‐ 0.00%
Refer to App B Part I, 2.2.1.2 Refer to App B Part I, 2.2.1.2 Refer to App B Part I, 2.2.1.2 Refer to App B Part I, 2.2.1.2 Refer to App B Part I, 2.2.1.2
1 of 14
Page 157 of 170
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORPORATION EPIC FOR REPLACEMENT OF OLD 3 PHASE TEST SEPARATORS AT ALL DEGASSING STATIONS IN DHK (PROJECT NO. 3963)
Detailed Engineering
Date: ITEM
DESCRIPTION
LUMP SUM AMOUNT (QAR)
Cummulative till last Invoice 95% OF LUMP SUM Amount QR. AMOUNT (QAR) % progress
This Invoice % progress
Amount QR.
Cummulative upto this invoice % progress
Amount QR.
2.2.1.1 App B Part 1 clause 2.2.1.1 Ninety five percent 95% of the LUMP PRICE portion is based on physical progress for the month
Schedule 02: Detailed Engineering A
B
C
D
E
F
G
H
I
J
K
L
M
Site Survey and Document Retrieval, as required in Scope of Work Clause 4.2, Appendix A and reference drawings. Prepare and submit for QP review and approval the Design Basis Memorandum including relevant detail design drawings as required in Scope of Work Clause 4.3, Appendix A. Prepare and submit Process engineering deliverables as required in Scope of Work Clause 4.4.2, Appendix A and reference drawings. Prepare and submit Mechanical/Piping engineering deliverables as required in Scope of Work Clause 4.4.3, Appendix A and reference drawings. Prepare and submit Instrumentation and Control System engineering deliverables as required in Scope of Work Clause 4.4.5, Appendix A and reference drawings. Prepare and submit Electrical engineering deliverables as required in Scope of Work Clause 4.4.6, Appendix A and reference drawings. Prepare and submit Civil/Structural engineering deliverables as required in Scope of Work Clause 4.4.7, Appendix A and reference drawings. Prepare and submit Loss Prevention engineering deliverables as required in Scope of Work Clause 4.4.9 Appendix A and reference drawings. Prepare and submit Environmental engineering deliverables as required in Scope of Work Clause 4.4.10, Appendix A and reference drawings. Prepare and submit Demolition engineering deliverables as required in Scope of Work Clause 4.4.14, Appendix A and reference drawings. Prepare and submit Tie-in Engineering Package & Tie-in Schedule as required in Scope of Work Clause 4.4.15, Appendix A and reference drawings. Carry out and implement HAZID and HAZOP Studies as required in Scope of Work Clause 4.4.9, Appendix A and reference drawings. Prepare and submit list for Spare Parts requirements for Second and Third Year of Operation, all as required in Scope of Work Clause 4.5.6, Appendix A.
Total Detailed Engineering
56,530.00
53,703.50
123,061.00
116,907.95
189,591.00
180,111.45
246,121.00
233,814.95
246,121.00
233,814.95
133,061.00
126,407.95
133,061.00
126,407.95
169,591.00
161,111.45
113,061.00
107,407.95
56,530.00
53,703.50
67,836.00
64,444.20
56,530.00
53,703.50
11,306.00
10,740.70
1,602,400.00
1,522,280.00
Page 158 of 170 1 of 14
CONTRACT NO: GC16110300 EPIC FOR EXTENSION OF MANIFOLDS TO CREATE ADDITIONAL SLOTS AT KN AND KS IN DUKHAN Procurement Item
DESCRIPTION
Cummulative till last Invoice 80% LUMP SUM AMOUNT (QAR) OF LUMP SUM AMOUNT % progress Amount QR. (QAR)
Schedule 03: Procurement 1 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 1.1.9 1.1.10 1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.3 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8 1.4 1.4.1 1.4.2 1.4.3 1.5 1.5.1 1.6 1.6.1 2 2.1 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.2 2.2.1
KHATIYAH NORTH Mechanical and Piping (10) Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control (6) All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring etc.) Any Other Item/Material Electrical (8) Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention (3) Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural (1) Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables (1) KHATIYAH MAIN Mechanical and Piping Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories
This Invoice
% progress
Amount QR.
Cummulative upto this invoice
% progress
Amount QR.
-
438,760.00 118,181.00 50,530.00 79,981.00 23,283.00 2,959.00 255,715.00 19,691.00 13,224.00 22,407.00 367,549.00 429,319.00 276,926.00 145,930.00
351,008.00 94,544.80 40,424.00 63,984.80 18,626.40 2,367.20 204,572.00 15,752.80 10,579.20 17,925.60 ‐ 294,039.20 343,455.20 221,540.80 116,744.00
415,389.00 332,311.20 ‐ ‐ ‐ 22,475.00 17,980.00 1,684.00 1,347.20 8,056.00 6,444.80 6,162.00 4,929.60 ‐ ‐ ‐ ‐ 15,631.00 12,504.80 ‐ ‐ ‐ 111,245.00 88,996.00 417,462.00 333,969.60 ‐ ‐ ‐ 250,769.00 200,615.20 ‐ ‐ ‐ ‐ ‐ 430,705.00 344,564.00 118,181.00 94,544.80 50,530.00 40,424.00 86,355.00 69,084.00 19,334.00 15,467.20 2,223.00 1,778.40 280,423.00 224,338.40 20,474.00 16,379.20 10,981.00 8,784.80 11,851.00 9,480.80 ‐ 367,549.00 294,039.20
Page 159 of 170 14 of 14
Item 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.7 2.3.8 2.4 2.4.1 2.4.2 2.4.3 2.5 2.5.1 2.6 2.6.1 3 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.4 3.4.1 3.4.2 3.4.3 3.5 3.5.1 3.6 3.6.1 4 4.1 4.1.1 4.1.2 4.1.3 4.1.4 4.1.5
DESCRIPTION All Control System Equipment and accessories Softwares for I & C Integration with existing systems Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring etc.) Any Other Item/Material Electrical Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables KHATIYAH SOUTH Mechanical and Piping Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring etc.) Any Other Item/Material Electrical Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables FAHAHIL NORTH Mechanical and Piping Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges
LUMP SUM
80%
Cummulative till last Invoice
This Invoice
Cummulative upto this invoice
350,797.00 280,637.60 276,926.00 221,540.80 145,930.00 116,744.00 415,389.00 332,311.20 ‐ ‐ ‐ 22,475.00 17,980.00 1,684.00 1,347.20 8,056.00 6,444.80 6,162.00 4,929.60 ‐ ‐ ‐ ‐ 15,631.00 12,504.80 ‐ ‐ ‐ 111,245.00 88,996.00 417,462.00 333,969.60 ‐ ‐ ‐ 291,169.00 232,935.20 ‐ ‐ ‐ ‐ ‐ 430,705.00 344,564.00 118,181.00 94,544.80 50,530.00 40,424.00 80,053.00 64,042.40 15,971.00 12,776.80 1,938.00 1,550.40 273,887.00 219,109.60 19,358.00 15,486.40 9,071.00 7,256.80 11,851.00 9,480.80 ‐ 367,549.00 294,039.20 350,797.00 280,637.60 276,926.00 221,540.80 145,930.00 116,744.00 415,389.00 332,311.20 ‐ 22,475.00 1,684.00 8,056.00 6,162.00 ‐ ‐ 15,631.00 ‐ 111,245.00 417,462.00 ‐ 279,357.00 ‐
430,705.00 118,181.00 50,530.00 130,535.00 27,875.00
‐ ‐ 17,980.00 1,347.20 6,444.80 4,929.60 ‐ ‐ 12,504.80 ‐ ‐ 88,996.00 333,969.60 ‐ ‐ 223,485.60 ‐ ‐ ‐ ‐ 344,564.00 94,544.80 40,424.00 104,428.00 22,300.00
Page 160 of 170 14 of 14
Item 4.1.6 4.1.7 4.1.8 4.1.9 4.1.10 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.2.5 4.2.6 4.3 4.3.1 4.3.2 4.3.3 4.3.4 4.3.5 4.3.6 4.3.7 4.3.8 4.4 4.4.1 4.4.2 4.4.3 4.5 4.5.1 4.6 4.6.1 5 5.1 5.1.1 5.1.2 5.1.3 5.1.4 5.1.5 5.1.6 5.1.7 5.1.8 5.1.9 5.1.10 5.2 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.3.6 5.3.7 5.3.8 5.4 5.4.1 5.4.2 5.4.3 5.5 5.5.1 5.6 5.6.1
DESCRIPTION Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring etc.) Any Other Item/Material Electrical Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables FAHAHIL MAIN Mechanical and Piping Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring etc.) Any Other Item/Material Electrical Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables
LUMP SUM
3,824.00 272,482.00 29,956.00 15,831.00 11,851.00 367,549.00 350,797.00 276,926.00 145,930.00
80%
Cummulative till last Invoice
This Invoice
Cummulative upto this invoice
3,059.20 217,985.60 23,964.80 12,664.80 9,480.80 ‐ 294,039.20 280,637.60 221,540.80 116,744.00
415,389.00 332,311.20 ‐ ‐ ‐ 22,475.00 17,980.00 1,684.00 1,347.20 8,056.00 6,444.80 6,162.00 4,929.60 ‐ ‐ ‐ ‐ 15,631.00 12,504.80 ‐ ‐ ‐ 111,245.00 88,996.00 417,462.00 333,969.60 ‐ ‐ ‐ 400,929.00 320,743.20 ‐ ‐ ‐ ‐ ‐ 430,705.00 344,564.00 118,181.00 94,544.80 50,530.00 40,424.00 73,841.00 59,072.80 16,321.00 13,056.80 2,588.00 2,070.40 223,361.00 178,688.80 24,227.00 19,381.60 9,270.00 7,416.00 17,776.00 14,220.80 ‐ 367,549.00 294,039.20 350,797.00 280,637.60 276,926.00 221,540.80 145,930.00 116,744.00 415,389.00 332,311.20 ‐ ‐ ‐ 22,475.00 17,980.00 1,684.00 1,347.20 8,056.00 6,444.80 6,162.00 4,929.60 ‐ ‐ ‐ ‐ 15,631.00 12,504.80 ‐ ‐ ‐ 111,245.00 88,996.00 417,462.00 333,969.60 ‐ ‐ ‐ 286,776.00 229,420.80 ‐ ‐ ‐
Page 161 of 170 14 of 14
Item 6 6.1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9 6.1.10 6.2 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.3 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5 6.3.6 6.3.7 6.3.8 6.4 6.4.1 6.4.2 6.4.3 6.5 6.5.1 6.6 6.6.1 7 7.1 7.1.1 7.1.2 7.1.3 7.1.4 7.1.5 7.1.6 7.1.7 7.1.8 7.1.9 7.1.10 7.2 7.2.1 7.2.2 7.2.3 7.2.4 7.2.5 7.2.6 7.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.3.8 7.4
DESCRIPTION FAHAHIL SOUTH Mechanical and Piping Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring etc.) Any Other Item/Material Electrical Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables JALEHA Mechanical and Piping Three Phase Test Separator BS&W Meter Sand Jetting Pipes Flanges Gasket Valves Fittings Stud Bolt & Nuts Any Other Item/Material Instrumentation & Control All Instrument Equipment, Field Instruments and accessories All Control System Equipment and accessories Softwares for I & C Integration with existing systems Cables, cable trays and accessories Hardwares (Input cards, termination units, terminals, additional wiring etc.) Any Other Item/Material Electrical Cables Cable Glands Earthing System Cable Tray Welding Sockets UPS Power Systems Lighting Fixtures and Socket Outlets Any Other Item/Material Loss Prevention
LUMP SUM 439,982.00 147,727.00 63,162.00 146,232.00 22,548.00 3,051.00 355,151.00 32,831.00 12,806.00 14,813.00 459,436.00 438,496.00 346,157.00 182,412.00
80%
Cummulative till last Invoice
This Invoice
Cummulative upto this invoice
‐ ‐ 351,985.60 118,181.60 50,529.60 116,985.60 18,038.40 2,440.80 284,120.80 26,264.80 10,244.80 11,850.40 ‐ 367,548.80 350,796.80 276,925.60 145,929.60
519,236.00 415,388.80 ‐ ‐ ‐ 28,094.00 22,475.20 2,105.00 1,684.00 10,070.00 8,056.00 7,702.00 6,161.60 ‐ ‐ ‐ ‐ 19,539.00 15,631.20 ‐ ‐ ‐ 139,056.00 111,244.80 521,827.00 417,461.60 ‐ ‐ ‐ 415,228.00 332,182.40 ‐ ‐ ‐ ‐ ‐ 538,382.00 430,705.60 147,727.00 118,181.60 63,162.00 50,529.60 123,869.00 99,095.20 25,494.00 20,395.20 3,337.00 2,669.60 286,808.00 229,446.40 34,974.00 27,979.20 14,479.00 11,583.20 14,813.00 11,850.40 ‐ 459,436.00 367,548.80 438,496.00 350,796.80 346,157.00 276,925.60 182,412.00 145,929.60 519,236.00 415,388.80 ‐ ‐ ‐ 28,094.00 22,475.20 2,105.00 1,684.00 10,070.00 8,056.00 7,702.00 6,161.60 ‐ ‐ ‐ ‐ 19,539.00 15,631.20 ‐ ‐ ‐
Page 162 of 170 14 of 14
Item 7.4.1 7.4.2 7.4.3 7.5 7.5.1 7.6 7.6.1 8 8.1 8.2
DESCRIPTION Fire & Gas Detection Systems Fire Extinguishers Any Other Item/Material Civil/Structural Materials for Civil/Structural Scope of Work Other Any other Mmaterials and consumables SPARES Spares for Commissioning and start‐up, as required in Scope of Work Clause 4.5.6, Appendix A. Spares for Guarantee Period, as required in Scope of Work Clause 4.5.6, Appendix A.
Total Procurement
LUMP SUM
80%
Cummulative till last Invoice
This Invoice
Cummulative upto this invoice
139,056.00 111,244.80 521,827.00 417,461.60 ‐ ‐ ‐ 325,999.00 260,799.20 ‐ ‐ ‐ ‐ 127,690.00 102,152.00 97,695.00 78,156.00 26,216,175.00 20,972,940.00
0.00% ‐
CONTRACTOR to split the aboave table into Bulk & Long lead items in terms of value for payment purposes.
Page 163 of 170 14 of 14
Equipment - Procurement Control Register for Invoice Project No. - 3963 "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" As Of : 06-Jul-17 SL. No.
Description
Plan/ Actual Date
Progress Scale
Issue Purchase Order 10%
QP inspected Successful Inspection and cleared commissioning cleared & FAT material at and handover site of spares 55%
80%
100%
1.0 LONG LEAD ITEMS 1
1.2 1.3
WTGE
2.1 3
0.15%
19-Jul-17
4-Jul-18
27-Jul-18
27-Jul-18
Test Separator BS&W Meter Sand Jetting Piping Early Tie-in Valves Instrumentation
3.1
Field Instrumentation
3.2
Control Valve / SD & BD Valve / PRV/ Orifice / Flow Meters
3.3 4 4.1
12.16% Actual Date Plan Date
9-Aug-17
Actual Date Plan Date
19-Jul-17
12-Feb-18
6-Apr-18
6-Apr-18 3.42%
4-Jul-18
27-Jul-18
27-Jul-18 1.47%
Modification of Existing System, Yokogawa,Emerson, Honey well Electrical Junction Box/Lighting Fixture
Plan Date
8-May-17
Actual Date
11-May-17
Plan Date
19-Oct-17
Actual Date Plan Date
23-Aug-17
Actual Date Plan Date
6-Sep-17
15-Aug-17
4-Oct-17
4-Oct-17 1.51%
5.1 5.2 5.3
Loss Preventation Fire Detection System Deluge Skids and Fire water Spray Nozzles Firefighting & Safety Equipment
2-Feb-18
12-Mar-18
12-Mar-18 10.63%
24-Feb-18
18-Apr-18
18-Apr-18 10.44%
27-Mar-18
4-May-18
4-May-18 20.01%
0.00% 0.00%
10.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
18-Sep-17
9-Dec-18
16-Jan-18
16-Jan-18 0.68%
0.00% 0.00%
Plan Date
23-Sep-17
Actual Date Plan Date
28-Sep-17
Actual Date Plan Date
28-Sep-17
Actual Date
0.00% 0.00%
10.00%
Actual Date Plan Date
0.00%
0.00%
Actual Date 5
% Phy. Comp. 0.15%
Equipment
Actual Date 2
% Progress
75.80%
Plan Date
1.1
% Weight
24-Feb-18
3-Apr-18
3-Apr-18 3.22%
2-Apr-18
10-May-18
10-May-18 10.86%
13-Feb-18
23-Mar-18
23-Mar-18 1.40%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Page 164 of 170
Bulk Material - Procurement Control Register for Invoice Project No. - 3963 "EPIC OF REPLACMENT OF THREE PHASE TEST SEPARATORS IN ALL DEGASSING STATIONS" SL. No.
Description
Plan/ Actual Date
Progress Scale
Issue Purchase Order
Inspection cleared & FAT
QP inspected and cleared material at site
10%
55%
80%
Successful commissioning and handover of spares 100%
2.0 BULK MATERIAL 1 1.1
As Of : 06-Jul-17 % Weight WTGE
2.1
0.000%
Piping Bolts&Nuts/Gaskets
Plan Date
28-Aug-17
9-Nov-17
28-Nov-17
26-Dec-17 0.40%
Intrumentation Cable tray/cable/tubes & fittings
Plan Date
3.1
Electrical Cable Trays/cable
Plan Date
7-Nov-17
25-Dec-17
8-Jan-18
28-Jan-18 4.18%
Civil/Strctural Steel
4.1
Civle/Strctural Steel
Plan Date
18-Sep-17
5-Nov-17
24-Nov-17
23-Dec-17 0.87%
Early Tie-in Piping
2.1
Pipes Early Tie-ins
2.2 2.3 2.4 2.5 2.6
2.7
Early Tie-in Flanges Early Tie-in Fittings Ball Valve / GGC Valve Pipes Remaining Flanges
Remiaining Project Fittings
5-Oct-17
12-Nov-17
26-Nov-17
16-Dec-17 8.54%
Issue Purchase Order
Inspection cleared & FAT
QP inspected and cleared material at site
Plan Date
28-May-17
25-Jun-17
30-Jul-17
Actual Date Plan Date
28-May-17
Actual Date Plan Date
28-May-17
Actual Date Plan Date
10-Aug-17
Actual Date Plan Date
28-Aug-17
Actual Date Plan Date
28-Aug-17
Actual Date Plan Date
28-Aug-17
Actual Date
0.00% 0.00%
Actual Date 2
0.00% 0.00%
Actual Date 4
0.00% 0.00%
Actual Date 3
% Phy. Comp. 0.919%
24.20%
Actual Date 2
% Progress
0.00%
Successful commissioning and handover of spares
14-Aug-17
1.11% 25-Jun-17
31-Aug-17
13-Sep-17 0.23%
25-Jun-17
31-Aug-17
13-Sep-17 0.33%
18-Feb-18
4-Apr-18
16-Apr-18 6.00%
21-Nov-17
23-Dec-17
4-Jan-18 1.69%
21-Nov-17
23-Dec-17
4-Jan-18 0.35%
21-Nov-17
23-Dec-17
0.00%
4-Jan-18 0.49%
55.00% 0.00% 55.00% 0.00% 55.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Page 165 of 170
CONTRACT NO: GC16110300 EPIC FOR EXTENSION OF MANIFOLDS TO CREATE ADDITIONAL SLOTS AT KN AND KS IN DUKHAN Construction Item
DESCRIPTION
95%
LUMP SUM AMOUNT (QAR)
Cummulative till last Invoice
OF LUMP SUM AMOUNT % progress (QAR)
Amount QR.
This Invoice % progress
Amount QR.
Cummulative upto this invoice % progress
Amount QR.
2.2.1.1 App B Part 1 clause 2.2.1.1 Ninety five percent 95% of the LUMP PRICE portion is based on physical progress for the month
Schedule 04: Construction 1
KHATIYAH NORTH
1.1 All “Mechanical/ Piping/ Machinery” construction works
210,537.00
200,010.15
All “Instrumentation & Controls” construction works
293,393.00
278,723.35
All “Electrical” construction works
177,334.00
168,467.30
All “Civil/Structural/Architectural” construction works
490,498.00
465,973.10
73,348.00
69,680.60
147,149.00
139,791.55
1.2
1.3
1.4
1.5 All “Loss Prevention” construction works
1.6
Demolition Work
1.7
Any Other Item
2
-
KHATIYAH MAIN
2.1 All “Mechanical/ Piping/ Machinery” construction works
172,493.00
163,868.35
All “Instrumentation & Controls” construction works
249,258.00
236,795.10
All “Electrical” construction works
145,290.00
138,025.50
All “Civil/Structural/Architectural” construction works
401,865.00
381,771.75
60,094.00
57,089.30
120,560.00
114,532.00
2.2
2.3
2.4
2.5 All “Loss Prevention” construction works
2.6
Demolition Work
2.7
Any Other Item
3
-
KHATIYAH SOUTH
Page 166 of 170 1 of 14
Item
DESCRIPTION
Cummulative till last Invoice
95%
LUMP SUM
This Invoice
Cummulative upto this invoice
3.1 All “Mechanical/ Piping/ Machinery” construction works
169,288.00
160,823.60
All “Instrumentation & Controls” construction works
235,911.00
224,115.45
All “Electrical” construction works
142,591.00
135,461.45
All “Civil/Structural/Architectural” construction works
394,399.00
374,679.05
58,978.00
56,029.10
118,320.00
112,404.00
-
-
3.2
3.3
3.4
3.5 All “Loss Prevention” construction works
3.6
Demolition Work
3.7
Any Other Item
4
FAHAHIL NORTH -
4.1 All “Mechanical/ Piping/ Machinery” construction works
156,146.00
148,338.70
All “Instrumentation & Controls” construction works
217,596.00
206,716.20
All “Electrical” construction works
131,520.00
124,944.00
All “Civil/Structural/Architectural” construction works
363,780.00
345,591.00
54,399.00
51,679.05
109,135.00
103,678.25
-
-
4.2
4.3
4.4
4.5 All “Loss Prevention” construction works
4.6
Demolition Work
4.7
Any Other Item
5
FAHAHIL MAIN -
5.1 All “Mechanical/ Piping/ Machinery” construction works
197,910.00
188,014.50
All “Instrumentation & Controls” construction works
275,797.00
262,007.15
All “Electrical” construction works
166,698.00
158,363.10
All “Civil/Structural/Architectural” construction works
461,081.00
438,026.95
68,949.00
65,501.55
138,324.00
131,407.80
-
-
5.2
5.3
5.4
5.5 All “Loss Prevention” construction works
5.6
Demolition Work
5.7
Any Other Item
Page 167 of 170 2 of 14
Item
6
DESCRIPTION
Cummulative till last Invoice
95%
LUMP SUM
This Invoice
Cummulative upto this invoice
FAHAHIL SOUTH -
6.1 All “Mechanical/ Piping/ Machinery” construction works
161,392.00
153,322.40
All “Instrumentation & Controls” construction works
224,908.00
213,662.60
All “Electrical” construction works
135,940.00
129,143.00
All “Civil/Structural/Architectural” construction works
376,004.00
357,203.80
56,227.00
53,415.65
112,801.00
107,160.95
-
-
6.2
6.3
6.4
6.5 All “Loss Prevention” construction works
6.6
Demolition Work
6.7
Any Other Item
7
JALEHA -
7.1 All “Mechanical/ Piping/ Machinery” construction works
208,217.00
197,806.15
All “Instrumentation & Controls” construction works
290,160.00
275,652.00
All “Electrical” construction works
175,380.00
166,611.00
All “Civil/Structural/Architectural” construction works
485,092.00
460,837.40
72,540.00
68,913.00
145,528.00
138,251.60
-
-
7.2
7.3
7.4
7.5 All “Loss Prevention” construction works
7.6
Demolition Work
7.7
Any Other Item
Total Construction
8,446,830.00
8,024,488.50
Page 168 of 170 3 of 14
CONTRACT NO: GC16110300 EPIC FOR EXTENSION OF MANIFOLDS TO CREATE ADDITIONAL SLOTS AT KN AND KS IN DUKHAN Pre-Commissioning, Commissioning & Operational Testing Item
DESCRIPTION
LUMP SUM AMOUNT (QAR)
95% OF LUMP SUM AMOUNT (QAR)
Cummulative till last Invoice % progress
2.2.1.1 App B Part 1 clause 2.2.1.1 Ninety five percent 95% of the LUMP PRICE portion is based on physical progress for the month Schedule 05: Pre‐Commissioning, Commissioning & Operational Testing 1 KHATIYAH NORTH 1.1 All pre-commissioning activities of the FACILITY, including 15,682.00 14,897.90 preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 1.2 All commissioning activities of the FACILITY including 25,354.00 24,086.30 preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 1.3 All Operations and performance tests including Site 89,537.00 85,060.15 Acceptance Tests (SAT) requirements. 1.4 Project Dossier: compilation by sub-system as required in 15,139.00 14,382.05 Scope of Work Clause 4.10, Appendix A 1.5 Any Other Item 18,388.00 17,468.60 ‐ 2 KHATIYAH MAIN 2.1 All pre-commissioning activities of the FACILITY, including 15,682.00 14,897.90 preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 2.2 All commissioning activities of the FACILITY including 25,354.00 24,086.30 preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 2.3 All Operations and performance tests including Site 89,537.00 85,060.15 Acceptance Tests (SAT) requirements. 2.4 Project Dossier: compilation by sub-system as required in 15,139.00 14,382.05 Scope of Work Clause 4.10, Appendix A 2.5 Any Other Item 18,388.00 17,468.60 ‐ 3 KHATIYAH SOUTH 3.1 All pre-commissioning activities of the FACILITY, including 15,682.00 14,897.90 preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 3.2 All commissioning activities of the FACILITY including 25,354.00 24,086.30 preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 3.3 All Operations and performance tests including Site 89,537.00 85,060.15 Acceptance Tests (SAT) requirements. 3.4 Project Dossier: compilation by sub-system as required in 15,139.00 14,382.05 Scope of Work Clause 4.10, Appendix A 1.5 Any Other Item 18,388.00 17,468.60 ‐ 4 FAHAHIL NORTH 4.1 All pre-commissioning activities of the FACILITY, including 15,682.00 14,897.90 preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 4.2 All commissioning activities of the FACILITY including 25,354.00 24,086.30 preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 4.3 All Operations and performance tests including Site 89,537.00 85,060.15 Acceptance Tests (SAT) requirements. 4.4 Project Dossier: compilation by sub-system as required in 15,139.00 14,382.05 Scope of Work Clause 4.10, Appendix A 4.5 Any Other Item 18,388.00 17,468.60 ‐ 5 FAHAHIL MAIN ‐ 5.1 All pre-commissioning activities of the FACILITY, including 15,682.00 14,897.90 preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts
Amount QR.
This Invoice % progress
Amount QR.
Cummulative upto this invoice % progress
Amount QR.
Page 169 of 170 1 of 14
Item DESCRIPTION 5.2 All commissioning activities of the FACILITY including preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 5.3 All Operations and performance tests including Site Acceptance Tests (SAT) requirements. 5.4 Project Dossier: compilation by sub-system as required in Scope of Work Clause 4.10, Appendix A 5.5 Any Other Item 6 FAHAHIL SOUTH 6.1 All pre-commissioning activities of the FACILITY, including preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 6.2 All commissioning activities of the FACILITY including preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 6.3 All Operations and performance tests including Site Acceptance Tests (SAT) requirements. 6.4 Project Dossier: compilation by sub-system as required in Scope of Work Clause 4.10, Appendix A 6.5 Any Other Item 7 JALEHA 7.1 All pre-commissioning activities of the FACILITY, including preparation of check lists, test sheets, status index, punch list, pre-commissioning dossier and spare parts 7.2 All commissioning activities of the FACILITY including preliminary checks, functional checks, and compilation of a “Ready For Startup” dossier and spare parts. 7.3 All Operations and performance tests including Site Acceptance Tests (SAT) requirements. 7.4 Project Dossier: compilation by sub-system as required in Scope of Work Clause 4.10, Appendix A 7.5 Any Other Item Total Pre‐Commissioning, Commissioning & Operational Testing
95%
Cummulative till last Invoice
This Invoice
Cummulative upto this invoice
25,354.00 24,086.30
89,537.00 85,060.15 15,139.00 14,382.05 18,388.00 17,468.60 ‐
15,682.00 14,897.90
25,354.00 24,086.30
89,537.00 85,060.15 15,139.00 14,382.05 18,388.00 17,468.60 ‐
15,682.00 14,897.90
25,354.00 24,086.30
89,537.00 85,060.15 15,139.00 14,382.05 18,388.00 17,468.60 1,148,700.00
1,091,265.00