COSTOS UNITARIOS DESCRIPCION AVANCES Rampa Positiva +10% (Con Jumbo) Rampa Positiva -10% (Con Jumbo) Rampa Positiva +10% (Con Jack Leg) Crucer, galeria, bypass (con jumbo) Crucer, galeria, bypass (con jackleg) Labor Horizontal (Con Jumbo) Labor Horizontal (Con Jack Leg) Labor Horizontal (Con Jumbo) Labor Horizontal (Con Jack Leg) Labor Horizontal (Con Jumbo) Labor Horizontal (Con Jack Leg) Galerìa Limpieza con scoop Subnivel Subnivel Chimenea Chimeneas P&V Tajo - Jumbo y scoop P&V Tajo - Jackleg y scoop EXPLOTACION Explotación Veta Central OTROS TRABAJOS Instalación tuberia polietileno de 2" y 4" Instalación tuberia fierro de 4" y 6" Limpieza de vía Cuneta Limpieza de cuneta Mejoramiento de cuneta Tarea adminsitrativa Movilizacion de campamentos OTRAS PLANTILLAS Salarios y Precios de Herramientas Costos de Equipos Costos Horario de Jumbo y Scoop

SECCION

4.50 m x 4.00 m 4.50 m x 4.00 m 4.50 m x 4.00 m 4.50 m x 4.00 m 4.50 m x 4.00 m 4.00 m x 4.00 m 4.00 m x 4.00 m 3.00 m x 3.00 m 3.00 m x 3.00 m 2.70 m x 2.70 m 2.70 m x 2.70 m 2.20 m x 2.40 m 1.80 m x 2.10 m 1.50 m x 2.10 m 1.20 m x 2.40 m 1.50 m x 1.50 m

UNID.

Costo

Utili CD

Directo

8.5%

S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. /m3 S/. /m3

972.03 984.63 1005.71 964.17 1127.96 933.31 1134.38 769.23 853.09 704.61 883.70 807.49 551.81 536.68 631.08 624.93 36.64 47.34

82.62 83.69 85.49 81.95 95.88 79.33 96.42 65.38 72.51 59.89 75.11 68.64 46.90 45.62 53.64 53.12 3.11 4.02

S/. /ton

61.03

5.19

S/. / m S/. / m S/. / m S/. / m S/. / m S/. / m S/. /Tarea S/.

3.64 14.65 11.45 24.54 16.13 16.46 204.01 47190.24

0.31 1.25 0.97 2.09 1.37 1.40 17.34 4011.17

Costo

Costo

Combustible

Total S/.

60.83 60.83 67.42 60.83 47.31 56.10 41.00 43.37 31.54 34.59 37.85 31.54 7.88 7.88 9.46 9.46 2.65 1.97

1115.49 1129.16 1158.61 1106.95 1271.14 1068.75 1271.80 877.98 957.14 799.09 996.66 907.67 606.60 590.18 694.18 687.51 42.40 53.34

DETALLE

0.00

66.22

DETALLE

3.95 15.89 12.42 26.89 17.50 17.86 221.35 51201.41

DETALLE

0.26

DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE

DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE DETALLE

DETALLE DETALLE DETALLE

ESCALA DE SUELDOS Y JORNALES DESCRIPCION DEL PUESTO

JORNAL S/.

Perforista Operario Mina Operador Scooptram Operador Jumbo Enmaderador Compresorista y lamparero Chofer de mina Capataz Bombero, Herrero, Soldador Bodeguero Ayudante Perforista Ayudante de servicios Ayudante de mina Ayudante de jumbo Ayudante de enmaderador Ayudante almacen Mecanico de equipo pesado Electricista mina Electricista de equipos Cuartelero

63.50 63.50 85.00 90.00 63.00 59.50 63.50 85.00 59.50 59.50 59.50 59.50 59.50 63.50 59.50 59.50 95.00 75.00 90.00 58.00

asignacion familiar 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50 2.50

LEYES SOCIALES Y COMPENSACIÓN POR TIEMPO DE SERVICIOS DE MANO DE OBRA DATOS USADOS EN EL CALCULO Total de Días al Año Días Laborables Domingos Descansos Médicos y Licencias Feriados Vacaciones (para completar a 30 días se toman 4 domingos) Básico Asignación Familiar (vigente desde el 01/06/2012) Feriado 100% bonificado CALCULO DE LEYES SOCIALES REMUNERACIÓN DIARIA BASE DE CALCULO CTS VACACIONES GRATIFICACIONES DOMINGOS Y FERIADOS DESCANSOS MEDICOS LICENCIA POR PATERNIDAD

APORTES REMUNERACION PRINCIPAL

ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY TOTAL APORTES REMUNERACION PRINCIPAL TRIBUTOS VACACIONES ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY TOTAL TRIBUTOS VACACIONES TRIBUTOS GRATIFICACIONES ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY TOTAL TRIBUTOS GRATIFICACIONES TRIBUTOS DOMINGOS Y FERIADOS ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY TOTAL TRIBUTOS DOMINGOS Y FERIADOS TRIBUTOS DESCANSOS MEDICOS (20 primeros asume el empleador) ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY TOTAL TRIBUTOS DESCANSOS MEDICOS TRIBUTOS LICENCIA POR PATERNIDAD ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY TOTAL TRIBUTOS DESCANSOS MEDICOS LEYES SOCIALES + BENEFICIOS

ESCALA DE SUELDOS Y

DESCRIPCION Botas de jebe Casco sombrero Tafilete de casco

UND

PRECIO (S/.)

Par Pza Pza

61.980 58.091 12.710

Orejeras p/ Operador Barbiquejo Respirador 3M 7500 premium Filtro alta eficiencia 3M 2097 Cartucho Vapores Orgánicos Guantes de Neoprene 14" Guante de cuero Correa portalampara Mameluco con cinta reflectiva Lampara minera Chaleco verde c/cinta fosforesente Lentes de seguridad Tapón auditivo Marbete de identificación (nombre) Botin Con punta de acero Minero Saco de jebe Pantalon de jebe mochila de lona Dispositivo lock out (candado gancho) Picota de geologo baston luminoso con pila Polos de seguridad (por calor) COSTO POR TAREA

Par Pza Pza Par Par Par Par Pza Pza Pza Pza Pza Pza Par Par Pza Pza Pza pza pza par pza

52.750 1.580 63.560 38.980 58.200 26.000 10.310 21.190 83.620 252.000 64.940 28.000 2.330 20.000 127.570 52.200 52.200 38.000 150.000 45.000 200.000 38.000

ACEROS DE PERFORACION DESCRIPCION Broca escariadora 2 1/2" Shank Adapter COP1238xT38 Acople T38/R38 Barra Ext. R38-H35-R32x12' ( 12 y 14 pies) Broca R32x45mm. Adaptador Piloto R32x12° Broca Rimadora R32x102mm Coplas de afilado Adaptador Split Set / perno helicoidal Barra de Extensión Porta Broca Conica 2' Barra de Extensión Porta Broca Conica 4' Barra de Extensión Porta Broca Conica 5' Barra de Extensión Porta Broca Conica 6' Barra de Extensión Porta Broca Conica 8' Broca Conica 38 mm. Broca Conica 41 mm.

UND Uni Uni Uni Uni Uni Uni Uni Uni Uni Uni Uni Uni Uni Uni Uni Uni

PRECIO (S/.) 387.000 844.650 245.830 1,300.000 283.610 586.000 616.160 357.500 230.000 135.440 181.590 240.200 258.450 275.440 72.060 74.000

EXPLOSIVOS Y ACCESORIOS DE VOLADURA DESCRIPCION Dinamita Semexa 45% 7/8" x 7" Dinamita Semexa 65% 7/8" x 7"

UND Cart Cart

PRECIO (S/.) 0.530 0.540

Dinamita Semexa 45% 7/8" x 7" Dinamita Semexa 65% 7/8" x 7" Dinamita Exadit 65% 7/8" x 7" Dinamita Semexa 65% 1 1/8" x 7" Dinamita Semexa 80% 1 1/8" x 8" Dinamita Semexa 65% 1 1/4" x 8" Dinamita Semexa 80% 1 1/4" x 8" Emulsiones 4500 7/8"x8" Emulsión Iremita 62 11/2" x 12" (68) Emulsiones 6500 1"x8" Emulsión Iremita 62 7/8" x 7" (308) Emulsión Iremita 62 1" x 8" (240) Emulsiones 6500 1"x8" Emulsiones 8000 1"x8" Anfo Examon Fulminante Nº 8 Fanel Mininel Guia Seguridad Carmex 8' Igniter Cord Pentacord

Kg Kg Kg Kg Kg Kg Kg Und Und Und Und Und Und Und Kg Kg Pza Pza Pza m Pza m m

6.172 6.509 5.899 5.803 5.918 6.236 6.657 0.560 2.030 0.700 0.450 0.700 0.700 0.590 1.740 2.128 0.308 3.338 2.929 0.254 1.497 1.064 1.075

HERRAMIENTAS DESCRIPCION

Corvina de 36 " Lampa Pico Combo 4 Lbs Combo 6 Lbs Combo 8 Lbs Combo 10 Lbs Combo 16 Lbs Llave Stilson de 8" Llave Stilson de 10" Llave Stilson de 14" LLave Francesa 8" Maquina Ban Dit Formon 1" Azuela (de 3Lbs.) Barretilla de aluminio de 4' Barretilla de aluminio de 6' Barretilla de aluminio de 8' Barretilla de aluminio de 10', 12' Barretilla de aluminio de 14' Atacador Pasteca (rondana) 6¨ diam. Cable de acero 3/8 ¨ Cizalla de 24 Ganchos de 1.5

UND

PRECIO (S/.)

Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza Pza pza und mt Pza Pza

178.20 26.46 29.57 19.24 34.70 41.04 51.57 78.79 27.41 73.52 87.36 24.03 325.00 23.80 26.81 59.40 70.20 78.00 85.80 98.20 9.84 497.50 2.26 114.80 19.99

Carretilla buggy Flexometro 5m Lámpara Detector de Energia Lámpara CEAG MLC 5.2 Baston luminoso con pilas recargables Lámpara (Alquiler) Disco de jebe Manguera Jebe 1" Manguera Jebe 1/2" Aceite de perforacion Cinta Ban Dit 1/2 Cinta Ban Dit 3/8 Escalera Telescopica de 4mts Escalera Telescopica de 3mts Ocre Polvo Rojo arco de sierra + hoja Boa de 2" Boa de 2" Tubo PVC 1 1/2 x 3.00 Mts. PETROLEO-DIESEL

Pza Pza Pza Pza Pza Pza Pza/mes Pz Mts Mts Glns rollo rollo Uni Uni Kg uni m m uni Glns

185.00 13.47 234.50 43.00 1,224.00 100.00 41.75 5.00 14.55 6.28 21.91 77.24 65.00 502.83 625.00 10.00 39.00 45.00 53.30 3.60 11.68

VOLVER

DE SUELDOS Y JORNALES feriados con 100% 01 por mes 4.88 4.88 6.54 6.92 4.85 4.58 4.88 6.54 4.58 4.58 4.58 4.58 4.58 4.88 4.58 4.58 7.31 5.77 6.92 4.46

O DE OBRA

Total ingreso afecto 70.88 70.88 94.04 99.42 70.35 66.58 70.88 94.04 66.58 66.58 66.58 66.58 66.58 70.88 66.58 66.58 104.81 83.27 99.42 64.96

factor de leyes sociales 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17% 103.17%

TOTAL (S/.) 144.02 144.02 191.06 202.00 142.92 135.26 144.02 191.06 135.26 135.26 135.26 135.26 135.26 144.02 135.26 135.26 212.94 169.18 202.00 131.98

LEYES SOCIALES Y COMPENSACIÓN POR TIEMPO DE SERV

365 267 52 8 12 26 OBREROS 62.00 2.50 4.77 64.50 OBREROS

13.29% 11.24% 22.47% 23.97% 1.50% 1.50% 73.96% Incidencia

DATOS USADOS EN EL CALCULO Total de Días al Año Días Laborables Domingos Descansos Médicos y Licencias Feriados Vacaciones (para completar a 30 días se toman Básico Asignación Familiar (vigente desde el 01/06/2012) CALCULO DE LEYES SOCIALES

REMUNERACIÓN DIAR CTS VACACIONES GRATIFICACIONES DOMINGOS Y FERIADOS DESCANSOS MEDICOS LICENCIA POR PATERNIDAD

APORTES REMUNERACION PRINCIPAL ESSALUD

9.00% 2.00% 1.50% 5.50% 0.53% 18.53%

JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY

TOTAL APORTES REMU TRIBUTOS VACACIONES ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY

1.01% 0.22% 0.17% 0.62% 0.06% 2.08%

TRIBUTOS GRATIFICACIONES ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY

2.02% 0.00% 0.34% 1.24% 0.00% 3.60%

TRIBUTOS DOMINGOS Y FERIADOS ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY

2.16% 0.48% 0.36% 1.32% 0.13% 4.44%

TOTAL TRIBUTOS DO TRIBUTOS DESCANSOS MEDICOS (20 primeros asume el em ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY TOTAL TRIBUTOS D TRIBUTOS LICENCIA POR PATERNIDAD ESSALUD JUBILACION ANTICIPADA SCTR-SALUD SCTR-PENSIONES VIDA LEY TOTAL TRIBUTOS D LEYES SOCIALES + BENEFICIOS

0.13% 0.03% 0.02% 0.08% 0.01% 0.28% 0.13% 0.03% 0.02% 0.08% 0.01% 0.28% 103.17%

ESCALA DE SUELDOS Y JORNALES

Vida Econom. 180.00 200.00 150.00

Incidencia 0.34 0.29 0.08

Obreros Con Ropa de agua

Obreros Sin Ropa de agua

0.34 0.29 0.08

0.32 0.19 0.08

Supervisoon sin ropa de agua 0.19 0.08

300.00 180.00 360.00 30.00 30.00 30.00 25.00 360.00 100.00 300.00 180.00 90.00 60.00 150.00 180.00 100.00 100.00 180.00 360.00 360.00 180.00 150.00

0.18 0.01 0.18 1.30 1.94 0.87 0.41 0.06 0.84 0.84 0.36 0.31 0.04 0.13 0.71 0.52 0.52 0.21 0.42 0.13 1.11 0.25 11.01

9.15

ON Vida Econ. (pp) 600.00 9,000.00 6,000.00 6,000.00 800.00 800.00 800.00 10,000.00 600.00 900.00 900.00 900.00 900.00 900.00 400.00 400.00

PU

US$/Caja

Kg/Caja

0.65 0.09 0.04 0.22 0.35 0.73 0.77 0.04 0.38 0.15 0.20 0.27 0.29 0.31 0.18 0.19

VOLADURA

0.01 0.18 1.30 1.94 0.87 0.41 0.06 0.84 0.84 0.31 0.04 0.13 0.52 0.52 0.21 0.25

0.18 0.01 0.18 1.03 1.94 0.87 0.41 0.06 0.46 0.84 0.31 0.04 0.13 0.000

0.01 0.18 1.03 1.94 0.87 0.41 0.06 0.46 0.84 0.36 0.31 0.04 0.13 0.65 0.000

0.42 1.11 8.59

0.42 0.13 8.12

55.11 58.12 52.67 51.81 52.84 55.68 59.44

25.00 25.00 25.00 25.00 25.00 25.00 25.00

261.5 90.63 160.43

250 pza/caja 1000 m/caja 300 pza/caja

575.72

1500 m/caja

Vida Econom.

PU

100.00 50.00 50.00 90.00 90.00 90.00 90.00 90.00 100.00 100.00 100.00 100.00 180.00 50.00 80.00 60.00 60.00 60.00 60.00 60.00 20.00 300.00 100.00 100.00 50.00

1.78 0.53 0.59 0.21 0.39 0.46 0.57 0.88 0.27 0.74 0.87 0.24 1.81 0.48 0.34 0.99 1.17 1.30 1.43 1.64 0.49 1.66 0.02 1.15 0.40

60.00 30.00 720.00 180.00 2,400.00 180.00 25.00 25.00 150.00 150.00 1.00 40.00 40.00 90.00 90.00 1.00 60.00 150.00 150.00 -

3.08 0.45 0.33 0.24 0.51 0.56 1.67 0.20 0.10 0.04 21.91 1.93 1.63 5.59 6.94 10.00 0.65 0.30 0.36 -

VOLVER

ÓN POR TIEMPO DE SERVICIOS DE MANO DE OBRA

01/06/2012)

365 267 52 8 12 26 EMPLEADOS 74.5 2.5 77.00 EMPLEADOS

REMUNERACIÓN DIARIA BASE DE CALCULO 13.29% 11.24% 22.47% 0.00% 1.50% 1.50% 49.99% Incidencia 9.00%

TOTAL APORTES REMUNERACION PRINCIPAL

2.00% 1.50% 5.50% 0.53% 18.53%

TOTAL TRIBUTOS VACACIONES

1.01% 0.22% 0.17% 0.62% 0.06% 2.08%

TOTAL TRIBUTOS GRATIFICACIONES

2.02% 0.00% 0.34% 1.24% 0.00% 3.60%

TOTAL TRIBUTOS DOMINGOS Y FERIADOS (20 primeros asume el empleador)

TOTAL TRIBUTOS DESCANSOS MEDICOS

TOTAL TRIBUTOS DESCANSOS MEDICOS

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.13% 0.03% 0.02% 0.08% 0.01% 0.28% 0.13% 0.03% 0.02% 0.08% 0.01% 0.28% 74.76%

Personal superficie 0.19 personal nuevo color amarillo por 6 meses 0.08

0.01 0.41 0.46 personal nuevo color naranja 6 meses 0.36 0.31 0.04 0.13 0.65 0.000 0.65 3.31

COSTO DE EQUIPOS EQUIPO O MAQUINARIA Jumbo Electrohidraulico Sandvick Scooptram Sandvick

COSTO 236.48 197.07

UNIDAD S/. / Hrs S/. / Hrs

COSTO EQUIPÓS MENORES BOMBA AGUA MASTER BOMBA AGUA MATADOR BOMBA AGUA MAXI BOMBA AGUA MAJOR MOTOSIERRA NEUMATICA PERFORACION POR PIE SHOCRETERA PATILLADORA MAQUINA SOLDAR VENTILADOR 50 HP VENTILADOR 86HP

COSTO 8.0 11.7 20.1 5.1 11.0 0.38 52.0 10.2 5.1 7.0 8.2

UNIDAD S/. / Hrs S/. / Hrs S/. / Hrs S/. / Hrs S/. / Hrs S/. / P.P. S/. / Hrs S/. / Hrs S/. / Hrs S/. / Hrs S/. / Hrs

INDICES DE CONSUMO DE COMBUSTIBLE Y EXPLOSIVOS Combustible Jumbo Electrohidraulico Sandvick Mod. D05 scoopTram Sandvick Mod. Lh 307

1.50 4.00

Gln / Hora Gln / Hora

Explosivos Rampa de 4.50 m x 4.00 m Labores de 3.0 m x 3.0 m Subnivel de 1.50 m x 2.10 m Subnivel de 1.20 m x 2.40 m Explotación Veta

38.00 32.00 22.40 8.70 1.12

Kg / m Kg / m Kg / m Kg / m Kg / ton

VOLVER

POS OBSERVACIONES no incluye combustible ni operador no incluye combustible ni operador OBSERVACIONES no incluye bombero no incluye bombero no incluye bombero no incluye bombero

TIPO DE CAMBIO

VOLVER

2.6

Jumbo AXERA D05 Precio compra ($) Precio juego llantas ($) Valor a depreciar en tres años Precio stock (V) Valor de rescate (Vr)

10.0%

Vida económica en horas (n) Vida económica en años (N) Vida llantas (horas)

Petróleo diesel Aceite perforación Aceite hidráulico Grasas lbs/hora

481,875 3,158 478,717 481,875 48,188

3600

10,500 2.9 3,000

Consumo gal/hora 1.50 0.12 0.54

Precio US $/gal 4.49 7.45 7.45 2.10

18.0

40.0% 80.0% 100.0

Filtro (0,4 * costo aceite + grasa) Reparaciones Cable eléctrico Factor de inversión K = (n+1)/2n Intereses % Seguros % Situación Ejemplo Horas de trabajo al mes: Tarifa equipo Ingresos Mensuales Gasto Reparación y Mant. Ingresos - Gastos Facturación Anual

0.67 10% 0%

$ $ $ $ $

165 97.69 16,119.17 7,920.41 8,198.75 90,186.26

COSTO DIRECTO SIN O

o AXERA D05 Costo de Propiedad Costo por depreciación Costo por intereses Costo por seguro Total costo de propiedad

US $/hora 40.70 8.99 49.69

Costo de operación Combustible Lubricantes (aceite grasa) Costo filtros Costo llantas Reparación llanta (15% costo llanta) Cable eléctrico Costo reparaciones Total costo de operación

US $/hora 6.74 2.03 0.81 1.05 0.16 0.50 36.71 48.00

Total Costo de Propiedad y Operación ($/hr)

97.69

Total Costo de Propiedad y Operación (S/. /hr)

254.00

COSTO DIRECTO SIN OPERADOR, NI COMBUSTIBLE (S/. /hr)

236.48

Scoop LH 307 4.2 yd3 Precio compra ($) Precio jgo llantas Vida llantas (hor) Precio stock (V) Valor de rescate (Vr) Vida económica en horas (n) Vida económica en años (N)

Combustible Aceite motor gal/hor Aceite hidraulico gal/hor Grasa lbs/hora Filtro (0,4 * costo aceite + grasa) Repuestos Factor de inversión K = (n+1)/2n Intereses % Seguros %

10%

467,455 16,167 1,500 451,288 45,129

3960

15,000 3.8

Consumo gal/hora 4.00 0.14 0.14 0.08

Precio US $/gal 4.49 7.45 7.45 2.10 20% 75% 0.63 10.0% 0.0%

COSTO DIRECTO SIN OPERADOR

op LH 307 4.2 yd3 Costo de Propiedad Costo por depreciación Costo por intereses Costo por seguro Total costo de Propiedad

US $/hora 27.08 7.46 34.54

Costo de operación Combustible Lubricantes (aceite grasa) Costo filtros Costo llantas Reparación llanta (15%) Repuestos Total costo de operación

US $/hora 17.97 2.25 4.04 10.78 1.62 22.56 59.23

Total Costo de Propiedad y Operación ($/hr)

93.76

Total Costo de Propiedad y Operación (S/. /hr)

243.79

COSTO DIRECTO SIN OPERADOR, NI COMBUSTIBLE (S/. /hr)

197.07

ESTRUCTURA DE COSTOS: RAMPA(+) 4.50 x 4.0 (JUMBO Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) : DESCRIPCIÓN

48.0 45.0 1.9

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

INCIDENCIA

tarea tarea tarea tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.25 1.30 1.30 1.30 1.30 1.30 1.30

Gln pp pp pp pp pp

0.33 518.40 518.40 32.40 518.40 518.40

100% 100% 100% 100% 100% 100%

pieza pieza pieza pieza pieza pieza rollo rollo pieza pieza pieza pieza pieza uni pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 45.00 0.17 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

tareas

3.90

100%

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Equipos Operador Jumbo Ayudante Jumbo Operador Scoop Maestro Perforista Ayudante Ayudante de servicios

0.709 0.709 1.418 0.886 100% 100% 50% 70% 70% 17%

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm Rimadora Shank adapter Copas de afilado

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Maquina Ban Dit Cinta Ban Dit 1/2 Cinta Ban Dit 3/8 Barretilla de 4' Barretilla de 6' Barretilla de 8' Barretilla de 10' Barretilla de 12' Tubo PVC 1 1/2 x 3.00 Mts. Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua

Tareas con ropa de agua

tareas

2.60

100%

Hm Hm

2.82 2.80

100% 100%

ml

1.00

100%

1.5 Equipos en Operación Jumbo 01 Brazo Scooptram Sandvick

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo (B)

UTILIDAD

8.5%

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Fanel Mecha rapida Cordon detonante

kg und m m

83.39 45.00 2.00 25.00

100% 100% 100% 100%

Combustible Petroleo Jumbo Petroleo Scoop

Gln Gln

4.23 11.20

100% 100%

(D)

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

+) 4.50 x 4.0 (JUMBO)

ongitud efectiva Perforación mts ficiencia perforación endimiento (m/disparo): P.U. S/. / Unid

Total S/. S/.

VOLVER 3.29 90% 2.96

RAMPA 4.5 m x 4.0 m

Total S/. /MET.

Perforación con Jumbo - Limpieza con Scoopt

(Extracción del desmonte hasta 150 metro 360.90 191.06 135.26 212.94 202.00 202.00 144.02 191.06 144.02 135.26 135.26

27.09 19.18 120.75 44.74 262.60 187.22 124.19 131.05 123.09 29.31

21.91 0.22 0.35 1.50 0.09 0.04

7.23 112.32 183.78 48.69 48.65 18.53

0.53 0.59 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 3.60 0.20 0.20 10.00 5.59 0.65

1.06 1.18 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 10.80 0.20 9.00 1.67 5.59 0.65

Datos Técnicos: Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

141.50

14.42

19.34 8.59

33.51

Dura 4.5 4.0 12.0 48 45.0 38.0 83.4

m m pie tal tal Kg/m Kg

Longitud de avance de perfora kilogramos/ taladro

9.15

23.79 411.34

236.48 197.07

666.87 551.79

24.54

24.54

24.54

972.03 82.62 236.02 6.24 3.34 1.06 1.08

520.04 150.21 2.13 26.88 60.83

11.68 11.68

49.41 130.82

1115.49

A 4.5 m x 4.0 m

o - Limpieza con Scooptram 5yd3

desmonte hasta 150 metros)

atos Técnicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. ongitud de avance de perforación logramos/ taladro

90% 90% 2.19 2.96 53.33 3.29 1.85

m m m3 mts

ESTRUCTURA DE COSTOS: RAMPA(+) 4.50 x 4.0 (JUMBO) Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) : DESCRIPCIÓN

48.0 45.0 1.9

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.25 1.30 1.30 1.30 1.30 1.30 1.30

Gln pp pp pp pp pp

pieza pieza pieza pieza pieza pieza rollo rollo pieza pieza pieza pieza pieza uni pieza pieza kg pieza pieza ml

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Equipos Operador Jumbo Ayudante Jumbo Operador Scoop Maestro Perforista Ayudante Ayudante de servicios

0.709 0.709 1.418 0.886 100% 100% 50% 70% 70% 17%

191.06 135.26 212.94 202.00 202.00 144.02 191.06 144.02 135.26 135.26

0.33 518.40 518.40 32.40 518.40 518.40

100% 100% 100% 100% 100% 100%

21.91 0.22 0.35 1.50 0.09 0.04

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 45.00 0.17 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 10%

0.53 0.59 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 3.60 0.20 0.20 10.00 5.59 0.65 53.30

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm Rimadora Shank adapter Copas de afilado

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Maquina Ban Dit Cinta Ban Dit 1/2 Cinta Ban Dit 3/8 Barretilla de 4' Barretilla de 6' Barretilla de 8' Barretilla de 10' Barretilla de 12' Tubo PVC 1 1/2 x 3.00 Mts. Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja Manguera tipo boa de 4" Φ

1.4 Implementos de Seguridad

Tareas sin ropa de agua Tareas con ropa de agua

tareas tareas

3.90 2.60

100% 100%

8.59 9.15

Hm Hm Hr

2.82 2.80 4.00

100% 100% 100%

236.48 197.07 8.00

ml

1.00

100%

24.54

1.5 Equipos en Operación Jumbo 01 Brazo Scooptram Sandvick Bomba eléctrica

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo (B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Fanel Mecha rapida Cordon detonante

kg und m m

83.39 45.00 2.00 25.00

100% 100% 100% 100%

6.24 3.34 1.06 1.08

Combustible Petroleo Jumbo Petroleo Scoop

Gln Gln

4.23 11.20

100% 100%

11.68 11.68

(D)

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

4.0 (JUMBO)

ectiva Perforación mts

o (m/disparo): Total S/. S/.

VOLVER 3.29 90% 2.96 Total S/. /MET.

RAMPA 4.5 m x 4.0 m Perforación con Jumbo - Limpieza con Scooptram 5yd3 (Extracción del desmonte hasta 150 metros)

360.90 Datos Técnicos:

27.09 19.18 120.75 44.74 262.60 187.22 124.19 131.05 123.09 29.31

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

141.50 7.23 112.32 183.78 48.69 48.65 18.53 16.22 1.06 1.18 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 10.80 0.20 9.00 1.67 5.59 0.65 5.33 19.34

Dura 4.5 4.0 12.0 48 45.0 38.0 83.4

m m pie tal tal Kg/m Kg

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. Longitud de avance de perfor kilogramos/ taladro

90% 90% 2.19 2.96 53.33 3.29 1.85

m m m3 mts

33.51 23.79 422.14 666.87 551.79 32.00 24.54 24.54

984.63 83.69 236.02 520.04 150.21 2.13 26.88 60.83 49.41 130.82

1129.16

ESTRUCTURA DE COSTOS: RAMPA(+) 4.50 x 4.0 (JACKLEG) Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

56.0 53.0 1.0

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.2 0.2 1.30 2.60 2.60

Gln pp pp

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Mina Operador Scoop Maestro Perforista Ayudante

1.063 1.063 1.063 1.063 25% 100% 100%

191.06 135.26 212.94 169.18 191.06 144.02 135.26

0.25 403.20 403.20

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 53.00 0.13 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 0.65

tareas tareas

1.30 5.20

50% 100%

pp pp m m Hm

403.20 12.00 30.00 30.00 2.85

100% 100% 100% 100% 100%

0.38 0.38 0.10 0.04 197.07

ml

1.00

100%

24.54

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Perforadora (Alcayatas) Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo (B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

55.60 2.00 53.00 2.00 20.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

11.40

100%

11.68

(D)

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

x 4.0 (JACKLEG)

a Perforación mts

Total S/. S/.

VOLVER 2.19 90% 1.98

RAMPA 4.5 m x 4.0 m

Total S/. /MET.

Perforación con Jackleg - Limpieza con Scooptram 5yd3 (Extracción del desmonte hasta 150 metros)

475.35 Datos Técnicos:

40.63 28.76 45.28 35.98 62.09 374.44 351.69 99.16 5.48 115.79 74.59 12.63 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 10.60 1.30 5.59 0.65 26.92 5.58 47.58 367.11 154.67 4.60 2.91 1.26 561.64 24.54 24.54

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 4.5 4.0 8.0 56 53.0 38.0 55.6

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

1005.71 85.49 267.61 346.69 2.99 155.24 2.13 21.50 67.42 133.15 1158.61

m x 4.0 m

pieza con Scooptram 5yd3

e hasta 150 metros)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 1.46 1.98 35.55 2.19 1.05

m m m3 mts

ESTRUCTURA DE COSTOS: CX,GAL, BYP. 4.50 x 4.0 (JUM Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) : DESCRIPCIÓN

45.0 42.0 2.0

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

INCIDENCIA

tarea tarea tarea tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.25 1.30 1.30 1.30 1.30 1.30 1.30

Gln pp pp pp pp pp

0.33 486.00 486.00 32.40 486.00 486.00

100% 100% 100% 100% 100% 100%

pieza pieza pieza pieza pieza pieza rollo rollo pieza pieza pieza pieza pieza uni pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 42.00 0.17 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

tareas

3.90

100%

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Equipos Operador Jumbo Ayudante Jumbo Operador Scoop Maestro Perforista Ayudante Ayudante de servicios

0.709 0.709 1.418 0.886 100% 100% 50% 70% 70% 17%

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm Rimadora Shank adapter Copas de afilado

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Maquina Ban Dit Cinta Ban Dit 1/2 Cinta Ban Dit 3/8 Barretilla de 4' Barretilla de 6' Barretilla de 8' Barretilla de 10' Barretilla de 12' Tubo PVC 1 1/2 x 3.00 Mts. Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua

Tareas con ropa de agua

tareas

2.60

100%

Hm Hm

2.82 2.80

100% 100%

ml

1.00

100%

1.5 Equipos en Operación Jumbo 01 Brazo Scooptram Sandvick

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo (B)

UTILIDAD

8.5%

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Fanel Mecha rapida Cordon detonante

kg und m m

83.39 42.00 2.00 25.00

100% 100% 100% 100%

Combustible Petroleo Jumbo Petroleo Scoop

Gln Gln

4.23 11.20

100% 100%

(D)

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

YP. 4.50 x 4.0 (JUMBO)

ngitud efectiva Perforación mts ciencia perforación endimiento (m/disparo): P.U. S/. / Unid

Total S/. S/.

VOLVER 3.29 90% 2.96

CX, GAL. BYP 4.5m x 4.0

Total S/. /MET.

Perforación con Jumbo - Limpieza con S

(Extracción del desmonte hasta 150 360.90 191.06 135.26 212.94 202.00 202.00 144.02 191.06 144.02 135.26 135.26

27.09 19.18 120.75 44.74 262.60 187.22 124.19 131.05 123.09 29.31

21.91 0.22 0.35 1.50 0.09 0.04

7.23 105.30 172.29 48.69 45.61 17.37

0.53 0.59 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 3.60 0.20 0.20 10.00 5.59 0.65

1.06 1.18 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 10.80 0.20 8.40 1.67 5.59 0.65

Datos Técnicos: Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

133.83

14.22

19.34 8.59

33.51

Dura 4.5 4.0 12.0 45 42.0 38.0 83.4

m m pie tal tal Kg/m Kg

9.15

23.79 411.34

236.48 197.07

666.87 551.79

24.54

24.54

24.54

964.17 81.95 232.64 6.24 3.34 1.06 1.08

520.04 140.20 2.13 26.88 60.83

11.68 11.68

49.41 130.82

1106.95

CX, GAL. BYP 4.5m x 4.0m

ón con Jumbo - Limpieza con Scooptram 5yd3

Extracción del desmonte hasta 150 metros) Datos Técnicos: Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. Longitud de avance de perforación kilogramos/ taladro

90% 90% 2.19 2.96 53.33 3.29 1.99

m m m3 mts

ESTRUCTURA DE COSTOS: CX,GAL,BYP. 4.50 x 4.0 (JACKLEG) Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

56.0 53.0 0.8

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.2 0.2 1.30 2.60 2.60

25% 100% 100%

191.06 135.26 212.94 169.18 191.06 144.02 135.26

Gln pp pp

0.25 302.40 302.40

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 53.00 0.13 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 0.20 0.20 10.00 5.59 0.65

tareas tareas

1.30 5.20

50% 100%

pp pp m m Hm

302.40 12.00 30.00 30.00 1.50

100% 100% 100% 100% 100%

0.38 0.38 0.10 0.04 197.07

ml

1.00

100%

24.54

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Mina Operador Scoop Maestro Perforista Ayudante

1.42 1.42 1.42 1.42

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Perforadora (Alcayatas) Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo

(B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

41.70 2.00 53.00 2.00 20.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

6.00

100%

11.68

(D)

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

50 x 4.0 (JACKLEG)

a Perforación mts

Total S/. S/.

VOLVER

1.65 90% 1.48

CX, GAL. BYP 4.5m x 4.0m

Total S/. /MET.

Perforación con Jackleg - Limpieza con Scooptram 5yd (Extracción del desmonte hasta 150 metros)

667.70 Datos Técnicos:

54.17 38.35 60.37 47.97 62.09 374.44 351.69 100.09 5.48 86.84 55.94 15.96 1.06 1.18 0.39 0.27 0.24 0.99 1.17 0.20 10.60 1.30 5.59 0.65 35.89 5.58 47.58 283.78 116.00 4.60 2.91 1.26 295.60 24.54 24.54 1127.96

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 4.5 4.0 6.0 56.0 53.0 38.0 41.7

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

95.88 298.30 260.02 2.99 155.24 2.13 21.50 47.31 70.08 1271.14

4.5m x 4.0m

pieza con Scooptram 5yd3

e hasta 150 metros)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 1.10 1.48 26.66 1.65 0.79

m m m3 mts

ESTRUCTURA DE COSTOS: HORIZONTAL 4.0 x 4.0 (JUM Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) : DESCRIPCIÓN

43.0 40.0 2.1

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

INCIDENCIA

tarea tarea tarea tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.25 1.30 1.30 1.30 1.30 1.30 1.30

Gln pp pp pp pp pp

0.33 464.40 464.40 32.40 464.40 464.40

100% 100% 100% 100% 100% 100%

pieza pieza pieza pieza pieza pieza rollo rollo pieza pieza pieza pieza pieza uni pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 40.00 0.17 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

tareas

3.90

50%

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Equipos Operador Jumbo Ayudante Jumbo Operador Scoop Maestro Perforista Ayudante Ayudante de servicios

0.709 0.709 1.418 0.886 100% 100% 50% 70% 70% 17%

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm Rimadora Shank adapter Copas de afilado

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Maquina Ban Dit Cinta Ban Dit 1/2 Cinta Ban Dit 3/8 Barretilla de 4' Barretilla de 6' Barretilla de 8' Barretilla de 10' Barretilla de 12' Tubo PVC 1 1/2 x 3.00 Mts. Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua

Tareas con ropa de agua

tareas

2.60

100%

Hm Hm

2.82 2.50

100% 100%

ml

1.00

100%

1.5 Equipos en Operación Jumbo 01 Brazo Scooptram Sandvick

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo (B)

UTILIDAD

8.5%

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Fanel Mecha rapida Cordon detonante

kg und m m

83.39 40.00 2.00 25.00

100% 100% 100% 100%

Combustible Petroleo Jumbo Petroleo Scoop

Gln Gln

4.23 10.00

100% 100%

(D)

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

TAL 4.0 x 4.0 (JUMBO)

ngitud efectiva Perforación mts ciencia perforación endimiento (m/disparo): P.U. S/. / Unid

Total S/. S/.

VOLVER 3.29 90% 2.96

Labor Horizontal 4.0 m x 4

Total S/. /MET.

Perforación con Jumbo - Limpieza con S

(Extracción del desmonte hasta 150 360.90 191.06 135.26 212.94 202.00 202.00 144.02 191.06 144.02 135.26 135.26

27.09 19.18 120.75 44.74 262.60 187.22 124.19 131.05 123.09 29.31

21.91 0.22 0.35 1.50 0.09 0.04

7.23 100.62 164.64 48.69 43.58 16.60

0.53 0.59 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 3.60 0.20 0.20 10.00 5.59 0.65

1.06 1.18 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 10.80 0.20 8.00 1.67 5.59 0.65

Datos Técnicos: Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

128.72

14.08

13.68 8.59

16.75

Dura 4.0 4.0 12.0 43 40.0 38.0 83.4

m m pie tal tal Kg/m Kg

9.15

23.79 391.39

236.48 197.07

666.87 492.67

24.54

24.54

24.54

933.31 79.33 230.39 6.24 3.34 1.06 1.08

520.04 133.52 2.13 26.88 56.10

11.68 11.68

49.41 116.80

1068.75

Labor Horizontal 4.0 m x 4.0 m

ón con Jumbo - Limpieza con Scooptram 5yd3

Extracción del desmonte hasta 150 metros) Datos Técnicos: Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. Longitud de avance de perforación kilogramos/ taladro

90% 90% 2.19 2.96 47.40 3.29 2.08

m m m3 mts

ESTRUCTURA DE COSTOS: HORIZONTAL 4.0 x 4.0 (JACKLEG) Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

53.0 50.0 0.8

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.2 0.2 1.30 2.60 2.60

Gln pp pp

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Mina Operador Scoop Maestro Perforista Ayudante

1.418 1.418 1.418 1.418 50% 100% 100%

191.06 135.26 212.94 169.18 191.06 144.02 135.26

0.25 286.20 286.20

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 50.00 0.13 1.00 4.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 0.00 0.65

tareas tareas

1.30 5.20

50% 100%

pp pp m m Hm

286.20 12.00 30.00 30.00 1.30

100% 100% 100% 100% 100%

0.38 0.38 0.10 0.04 197.07

ml

1.00

100%

24.54

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Alcayatas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Perforadora (Alcayatas) Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo (B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

41.70 2.00 50.00 2.00 20.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

5.20

100%

11.68

(D)

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

0 x 4.0 (JACKLEG)

a Perforación mts

Total S/. S/.

VOLVER

1.65 90% 1.48

Labor Horizontal 4.0 m x 4.0 m

Total S/. /MET.

Perforación con Jackleg - Limpieza con Scooptram 5yd (Extracción del desmonte hasta 150 metros)

709.62 Datos Técnicos:

54.17 38.35 60.37 47.97 124.19 374.44 351.69 94.92 5.48 82.19 52.95 16.43 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 10.00 1.30 5.59 0.00 0.65 35.89 5.58 47.58 252.98 109.79 4.60 2.91 1.26 256.19 24.54 24.54

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 4.0 4.0 6.0 53 50.0 38.0 41.7

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

1134.38 96.42 292.37 260.02 2.99 146.45 2.13 21.50 41.00 60.74 1271.80

4.0 m x 4.0 m

pieza con Scooptram 5yd3

e hasta 150 metros)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 1.10 1.48 23.70 1.65 0.83

m m m3 mts

ESTRUCTURA DE COSTOS: HORIZONTAL 3.0 x 3.0 (JUM Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) : DESCRIPCIÓN

41.0 38.0 1.8

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

INCIDENCIA

tarea tarea tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.25 1.30 1.30 1.30 1.30 1.30

Gln pp pp pp pp pp

0.33 442.80 442.80 32.40 442.80 442.80

100% 100% 100% 100% 100% 100%

pieza pieza pieza pieza pieza pieza rollo rollo pieza pieza pieza pieza pieza uni pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 38.00 4.00 0.17 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

tareas

3.90

100%

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Equipos Operador Jumbo Ayudante Jumbo Operador Scoop Maestro Perforista Ayudante

0.709 0.709 1.418 0.886 100% 100% 40% 50% 50%

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm Rimadora Shank adapter Copas de afilado

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Maquina Ban Dit Cinta Ban Dit 1/2 Cinta Ban Dit 3/8 Barretilla de 4' Barretilla de 6' Barretilla de 8' Barretilla de 10' Barretilla de 12' Tubo PVC 1 1/2 x 3.00 Mts. Disco de jebe Taco de Arcilla Alcayatas Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua

Tareas con ropa de agua

tareas

2.60

100%

Hm Hm pp

2.00 2.00 12.00

100% 100% 100%

ml

0.00

100%

1.5 Equipos en Operación Jumbo 01 Brazo Scooptram Sandvick

Perforadora (Alcayatas) 1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo (B)

UTILIDAD

8.5%

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Fanel Mecha rapida Cordon detonante

kg und m m

70.23 38.00 2.00 25.00

100% 100% 100% 100%

Combustible Petroleo Jumbo Petroleo Scoop

Gln Gln

3.00 8.00

100% 100%

(D)

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

TAL 3.0 x 3.0 (JUMBO)

ngitud efectiva Perforación mts ciencia perforación endimiento (m/disparo): P.U. S/. / Unid

Total S/. S/.

VOLVER 3.29 90% 2.96

Labor Horizontal 3.0 m x 3

Total S/. /MET.

Perforación con Jumbo - Limpieza con S

(Extracción del desmonte hasta 150 318.11 191.06 135.26 212.94 202.00 202.00 144.02 191.06 144.02 135.26

27.09 19.18 120.75 44.74 262.60 187.22 99.35 93.61 87.92

21.91 0.22 0.35 1.50 0.09 0.04

7.23 95.94 156.98 48.69 41.56 15.83

Datos Técnicos: Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo 123.61

13.95 0.53 0.59 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 3.60 0.20 0.20 0.00 10.00 5.59 0.65

1.06 1.18 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 10.80 0.20 7.60 0.00 1.67 5.59 0.65 19.34

8.59

33.51

Dura 3.0 3.0 12.0 41 38.0 32.0 70.2

m m pie tal tal Kg/m Kg

9.15

23.79 294.21

236.48 197.07 0.38

472.96 394.14 4.56

24.54

0.00

0.00

769.23 65.38 200.42 6.24 3.34 1.06 1.08

437.93 126.84 2.13 26.88

11.68 11.68

35.04 93.44

43.37

877.98

Labor Horizontal 3.0 m x 3.0 m

ón con Jumbo - Limpieza con Scooptram 5yd3

Extracción del desmonte hasta 150 metros) Datos Técnicos: Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. Longitud de avance de perforación kilogramos/ taladro

90% 90% 2.19 2.96 26.66 3.29 1.85

m m m3 mts

ESTRUCTURA DE COSTOS: HORIZONTAL 3.0 x 3.0 (JACKLEG) Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

46.0 43.0 0.8

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.33 0.2 1.30 1.30 1.30

Gln pp pp

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Mina Operador Scoop Maestro Perforista Ayudante

1.418 1.418 2.339 1.418 50% 100% 100%

191.06 135.26 212.94 169.18 191.06 144.02 135.26

0.25 248.40 248.40

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 43.00 0.13 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 0.65

tareas tareas

0.65 2.60

100% 100%

pp m m Hm

248.40 30.00 30.00 1.00

100% 100% 100% 100%

0.38 0.10 0.04 197.07

ml

0.00

100%

24.54

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo

(B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

35.11 2.00 43.00 2.00 20.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

4.00

100%

11.68

(D)

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

0 x 3.0 (JACKLEG)

a Perforación mts

VOLVER

1.65 90% 1.48

Total S/. S/.

Labor Horizontal 3.0 m x 3.0 m

Total S/. /MET.

Perforación con Jackleg - Limpieza con Scooptram 5yd (Extracción del desmonte hasta 150 metros)

534.73 Datos Técnicos:

54.17 38.35 164.37 47.97 124.19 187.22 175.84 82.87 5.48 71.33 45.95 15.48 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 8.60 1.30 5.59 0.65 19.83 5.58 23.79 200.17 95.29 2.91 1.26 197.07 0.00 0.00 853.09

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 3.0 3.0 6.0 46 43.0 32.0 35.1

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

72.51 250.81 218.96 2.99 125.95 2.13 21.50 31.54 46.72 957.14

3.0 m x 3.0 m

pieza con Scooptram 5yd3

e hasta 150 metros)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 1.10 1.48 13.33 1.65 0.82

m m m3 mts

ESTRUCTURA DE COSTOS: CX,GAL,BYP 2.7 x 2.7 (JUMB Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) : DESCRIPCIÓN

36.0 33.0 2.0

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

INCIDENCIA

tarea tarea tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.25 1.30 1.30 1.30 1.30 1.30

Gln pp pp pp pp pp

0.33 388.80 388.80 32.40 388.80 388.80

100% 100% 100% 100% 100% 100%

pieza pieza pieza pieza pieza pieza rollo rollo pieza pieza pieza pieza pieza uni pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 1.00 33.00 4.00 0.17 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

tareas

3.12

100%

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Equipos Operador Jumbo Ayudante Jumbo Operador Scoop Maestro Perforista Ayudante

0.709 0.709 1.418 0.886 100% 100% 40% 50% 50%

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm Rimadora Shank adapter Copas de afilado

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Maquina Ban Dit Cinta Ban Dit 1/2 Cinta Ban Dit 3/8 Barretilla de 4' Barretilla de 6' Barretilla de 8' Barretilla de 10' Barretilla de 12' Tubo PVC 1 1/2 x 3.00 Mts. Disco de jebe Taco de Arcilla Alcayatas Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua

Tareas con ropa de agua

tareas

1.30

100%

Hm Hm pp

1.85 1.50 12.00 .

100% 100% 100%

ml

0.00

100%

1.5 Equipos en Operación Jumbo 01 Brazo Scooptram Sandvick

Perforadora (Alcayatas) 1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo (B)

UTILIDAD

8.5%

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Fanel Mecha rapida Cordon detonante

kg und m m

65.84 33.00 2.00 25.00

100% 100% 100% 100%

Combustible Petroleo Jumbo Petroleo Scoop

Gln Gln

2.78 6.00

100% 100%

(D)

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

YP 2.7 x 2.7 (JUMBO)

ngitud efectiva Perforación mts ciencia perforación endimiento (m/disparo): P.U. S/. / Unid

Total S/. S/.

VOLVER 3.29 90% 2.96

Labores 3.7 m x 3.7 m

Total S/. /MET.

Perforación con Jumbo - Limpieza con S

(Extracción del desmonte hasta 150 318.11 191.06 135.26 212.94 202.00 202.00 144.02 191.06 144.02 135.26

27.09 19.18 120.75 44.74 262.60 187.22 99.35 93.61 87.92

21.91 0.22 0.35 1.50 0.09 0.04

7.23 84.24 137.83 48.69 36.49 13.90

Datos Técnicos: Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo 110.84

13.61 0.53 0.59 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 3.60 0.20 0.20 0.00 10.00 5.59 0.65

1.06 1.18 0.39 0.27 0.24 1.81 1.93 1.63 0.99 1.17 1.30 1.43 1.43 10.80 0.20 6.60 0.00 1.67 5.59 0.65 13.06

8.59

26.80

Dura 2.7 2.7 12.0 36 33.0 30.0 65.8

m m pie tal tal Kg/m Kg

9.15

11.90 248.98

236.48 197.07 0.38

437.49 295.60 4.56

24.54

0.00

0.00

704.61 59.89 185.55 6.24 3.34 1.06 1.08

410.56 110.15 2.13 26.88

11.68 11.68

32.41 70.08

34.59

799.09

Labores 3.7 m x 3.7 m

ón con Jumbo - Limpieza con Scooptram 5yd3

Extracción del desmonte hasta 150 metros) Datos Técnicos: Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. Longitud de avance de perforación kilogramos/ taladro

90% 90% 2.19 2.96 21.60 3.29 2.00

m m m3 mts

ESTRUCTURA DE COSTOS: CX,GAL,BYP 2.7 x 2.7 (JACKLEG) Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

42.0 39.0 0.8

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.2 1.30 1.30 1.30

30% 100% 100%

191.06 135.26 212.94 169.18 191.06 144.02 135.26

Gln pp pp

0.25 226.80 226.80

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 39.00 0.13 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 0.65

tareas tareas

0.39 2.60

100% 100%

pp m m Hm

226.80 30.00 30.00 1.20

100% 100% 100% 100%

0.38 0.10 0.04 197.07

ml

0.00

100%

24.54

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Mina Operador Scoop Maestro Perforista Ayudante

1.42 1.42 2.84 1.42

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

1.6 Sub Partida (C.D) Cuneta 0.30 X 0.30

(A) Total Costo Directo

(B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

32.92 2.00 39.00 2.00 20.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

4.80

100%

11.68

(D)

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

7 x 2.7 (JACKLEG)

a Perforación mts

VOLVER 1.65 90% 1.48

Total S/. S/.

Labores 2.7 m x 2.7 m

Total S/. /MET.

Perforación con Jackleg - Limpieza con Scooptram 5yd (Extracción del desmonte hasta 150 metros)

553.26 Datos Técnicos:

54.17 38.35 241.50 47.97 74.51 187.22 175.84 75.99 5.48 65.13 41.96 14.94 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 7.80 1.30 5.59 0.65 18.32 3.35 23.79 221.19 87.00 2.91 1.26 236.48 0.00 0.00 883.70

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 2.7 2.7 6.0 42 39.0 30.0 32.9

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

75.11 233.66 205.28 2.99 114.23 2.13 21.50 37.85 56.06 996.66

m x 2.7 m

pieza con Scooptram 5yd3

e hasta 150 metros)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 1.10 1.48 10.80 1.65 0.84

m m m3 mts

ESTRUCTURA DE COSTOS: CX,GAL,BYP 2.2 x 2.4 (JACKLEG) Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

32.0 30.0 0.8

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.2 1.30 1.30 1.30

50% 80% 80%

191.06 135.26 212.94 169.18 191.06 144.02 135.26

Gln pp pp

0.25 172.80 172.80

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 30.00 0.13 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 0.65

tareas tareas

0.65 2.08

100% 100%

pp m m Hm

172.80 30.00 30.00 1.00

100% 100% 100% 100%

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Mina Operador Scoop Maestro Perforista Ayudante

1.42 1.42 2.84 1.42

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

(A) Total Costo Directo (B)

UTILIDAD

8.5%

0.38 0.10 0.04 197.07

(C)

(D)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

24.14 2.00 30.00 2.00 10.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

4.00

100%

11.68

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

2 x 2.4 (JACKLEG)

a Perforación mts

VOLVER 1.65 90% 1.48

Total S/. S/.

Labores 2.2 m x 2.4 m

Total S/. /MET.

Perforación con Jackleg - Limpieza con Scooptram 5yd (Extracción del desmonte hasta 150 metros)

537.78 Datos Técnicos:

54.17 38.35 241.50 47.97 124.19 149.78 140.67 58.78 5.48 49.62 31.97 13.73 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 6.00 1.30 5.59 0.65 16.62 5.58 19.03 180.59 66.29 2.91 1.26 197.07 807.49 68.64

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 2.2 2.4 6.0 32 30.0 22.0 24.1

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

171.66 150.54 2.99 87.87 2.13 10.75 31.54 46.72 907.67

m x 2.4 m

pieza con Scooptram 5yd3

e hasta 150 metros)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 1.10 1.48 7.82 1.65 0.80

m m m3 mts

P&V CON JUMBO LIMPIEZA CON SCOOP Taladros Perforados /disparo Volumen arrancado / Gdia (m3) Factor de carga (Kg/m3) : Burden (m)

25.0 61.7 1.8 1.0

DESCRIPCIÓN

Longitud efectiva Perforación mts Ton Rotas por Guardia (ton) Rendimiento (m3/tal): Espaciamiento (m) UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.25 1.30 1.30 1.30

50% 100% 100%

191.06 135.26 212.94 202.00 191.06 202.00 144.02

Gln pp pp pp pp pp

0.25 225.00 225.00 225.00 225.00 225.00

100% 100% 100% 100% 100% 100%

21.91 0.29 0.19 0.77 0.09 0.04

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25.00 0.13 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 0.65

tareas tareas

0.65 2.60

100% 100%

Hm Hm

2.50 2.56

100% 100%

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Equipo Operador Scoop Operador Jumbo Ayudante Jumbo

0.77 0.77 1.53 0.96

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm Rimadora Shank adapter Copas de afilado

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Jumbo Electrohidraulico Sandvick Scooptram Sandvick

(A) Total Costo Directo

236.48 197.07

(B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

111.10 2.00 25.00 0.20 10.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Scooptram Sandvick Petroleo Scoop

Gln Gln

10.24 3.75

100% 100%

11.68 11.68

(D)

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

SCOOP

VOLVER

a Perforación mts uardia (ton)

2.74 166.65 2.47 1.0

Total S/. S/.

P&V CON JUMBO Y LIMPIEZA CON SCOOP

Total S/. /m3.

Perforación con Jackleg - Limpieza con Scooptram 5 (Extracción del desmonte hasta 150 metros)

13.01 Datos Técnicos:

29.25 20.71 130.41 48.32 124.19 262.60 187.22 5.09 5.48 64.61 41.63 173.30 21.12 8.04 0.31 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 5.00 1.30 5.59 0.65 0.48 5.58 23.79 17.75 591.20 504.49 36.64

Tipo de roca: Burden Espaciamiento Long. Barra (pie) NºTaladros Factor de carga: Volumen arrancado Tonelaje

Dura 1.0 1.0 10.0 25 1.8 61.7 166.6

m m pies tal Kg/m3 m3 ton

3.11 12.64 692.82 2.99 73.23 0.21 10.75 2.65 119.60 43.80 42.40

ON JUMBO Y LIMPIEZA CON SCOOP

ón con Jackleg - Limpieza con Scooptram 5yd3

Extracción del desmonte hasta 150 metros) Datos Técnicos: Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. Long. Perfo. Densidad

90% 90% 1.65 2.47 2.47 2.74 2.70

m m m3 m ton/m3

P&V CON JACKLEG Y LIMPIEZA CON SCOOP Taladros Perforados /disparo Volumen arrancado / Gdia (m3) Factor de carga (Kg/m3) : Burden (m)

25.0 23.7 2.5 0.8

DESCRIPCIÓN

Longitud efectiva Perforación mts Ton Rotas por Guardia (ton) Rendimiento (m3/tal): Espaciamiento (m) UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.4 0.2 0.50 1.30 1.30

50% 100% 100%

191.06 135.26 212.94 169.18 191.06 144.02 135.26

Gln pp pp

0.25 135.00 135.00

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 25.00 0.13 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 0.65

tareas tareas

0.25 2.60

100% 100%

pp m m Hm

135.00 30.00 30.00 1.00

100% 100% 100% 100%

1.1 Mano de Obra Capataz Bodeguero Mecánico electricista Mina Operador Scoop Maestro Perforista Ayudante

1.28 1.28 2.55 1.28

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

(A) Total Costo Directo (B)

UTILIDAD

8.5%

0.38 0.10 0.04 197.07

(C)

(D)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

59.25 2.00 25.00 0.20 8.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

4.00

100%

11.68

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

N SCOOP

VOLVER

a Perforación mts uardia (ton)

1.65 63.99 0.95 0.8

Total S/. S/.

P&V CON JACKLEG Y LIMPIEZA CON SCOO

Total S/. /m3.

Perforación con Jackleg - Limpieza con Scooptram 5 (Extracción del desmonte hasta 150 metros)

31.84 Datos Técnicos:

48.75 34.52 217.35 43.17 47.76 187.22 175.84 2.92 5.48 38.77 24.98 0.82 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 5.00 1.30 5.59 0.65 1.09 2.15 23.79 10.68 51.79 2.91 1.26 197.07 47.34 4.02

Tipo de roca: Burden Espaciamiento Long. Barra (pie) NºTaladros Factor de carga: Volumen arrancado Tonelaje

Dura 0.8 0.8 6.0 25 2.5 23.7 64.0

m m pies tal Kg/m3 m3 ton

19.18 369.50 2.99 73.23 0.21 8.60 1.97 46.72 53.34

N JACKLEG Y LIMPIEZA CON SCOOP

ón con Jackleg - Limpieza con Scooptram 5yd3

Extracción del desmonte hasta 150 metros) Datos Técnicos: Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. Long. Perfo. Densidad

90% 90% 0.99 1.48 0.95 1.65 2.70

m m m3 m ton/m3

ESTRUCTURA DE COSTOS: SUBNIVEL 1.80 x 2.10 Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

31.0 28.0 0.9

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea

0.2 0.2 0.2 1.30 1.30 1.30

Gln pp pp

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero electricista Mina Maestro Perforista Ayudante Operador Scoop

1.42 1.42 1.42 100% 100% 25%

191.06 135.26 169.18 144.02 135.26 191.06

0.25 167.40 167.40

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 28.00 0.13 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 3.08 0.65

tareas tareas

0.33 2.60

100% 100%

pp m m Hm

167.40 30.00 30.00 0.25

100% 100% 100% 100%

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Carretilla buggy Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

(A) Total Costo Directo (B)

UTILIDAD

8.5%

0.38 0.10 0.04 197.07

(C)

(D)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

24.58 2.00 28.00 2.00 10.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

1.00

100%

11.68

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

1.80 x 2.10

a Perforación mts

VOLVER 1.65 90% 1.48

Total S/. S/.

SUBNIVEL 1.80m x 2.10m

Total S/. /MET.

Perforación con Jackleg

(Limpieza con carretilla hasta 30 metros - Seguidamente con Sc 381.85 54.17 38.35 47.97 187.22 175.84 62.09

Datos Técnicos:

57.06 5.48 48.07 30.97 15.54 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 5.60 1.30 5.59 3.08 0.65 17.94 2.79 23.79 79.42 64.21 2.91 1.26 49.27 551.81 46.90

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 1.8 2.1 6.0 31 28.0 22.4 24.6

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

169.55 153.28 2.99 82.01 2.13 10.75 7.88 11.68 606.60

0m x 2.10m

on Jackleg

tros - Seguidamente con Scoop)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 1.10 1.48 5.60 1.65 0.88

m m m3 mts

ESTRUCTURA DE COSTOS: SUBNIVEL 1.50 x 2.10 Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

29.0 27.0 0.7

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea

0.2 0.2 0.2 1.30 1.30 1.30

Gln pp pp

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero electricista Mina Maestro Perforista Ayudante Operador Scoop

1.42 1.42 1.42 100% 100% 20%

191.06 135.26 169.18 144.02 135.26 191.06

0.25 156.60 156.60

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 27.00 0.13 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 1.30 0.20 0.20 10.00 5.59 3.08 0.65

tareas tareas

0.26 2.60

100% 100%

pp m m Hm

156.60 30.00 30.00 0.25

100% 100% 100% 100%

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Barretilla de 8' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Escaleras telescopicas Carretilla buggy Arco de sierra + hoja

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

(A) Total Costo Directo (B)

UTILIDAD

8.5%

0.38 0.10 0.04 197.07

(C)

(D)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8" Carmex Mininel Mecha rapida Cordon detonante

kg und und m m

19.75 2.00 27.00 2.00 10.00

100% 100% 100% 100% 100%

6.24 1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

1.00

100%

11.68

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

1.50 x 2.10

a Perforación mts

VOLVER 1.65 90% 1.48

Total S/. S/.

SUBNIVEL 1.50m x 2.10m

Total S/. /MET.

Perforación con Jackleg

(Limpieza con carretilla hasta 30 metros - Seguidamente con Sc 373.47 54.17 38.35 47.97 187.22 175.84 49.67

Datos Técnicos:

53.61 5.48 44.97 28.97 15.41 1.06 1.18 0.39 0.27 0.24 0.99 1.17 1.30 0.20 5.40 1.30 5.59 3.08 0.65 17.57 2.23 23.79 76.62 60.07 2.91 1.26 49.27 536.68 45.62

Tipo de roca: Ancho Labor: Alto Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 1.5 2.1 6.0 29 27.0 18.0 19.8

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

147.25 123.17 2.99 79.08 2.13 10.75 7.88 11.68 590.18

0m x 2.10m

on Jackleg

tros - Seguidamente con Scoop)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 1.10 1.48 4.67 1.65 0.73

m m m3 mts

ESTRUCTURA DE COSTOS: CHIMENEA 1.20 x 2.40 Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

33.0 30.0 0.5

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea

0.2 0.2 0.1 1.30 1.30 1.30

Gln pp pp

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero electricista Mina Maestro Perforista Ayudante Operador Scoop

1.70 1.70 0.85 100% 100% 25%

191.06 135.26 169.18 144.02 135.26 191.06

0.25 148.50 148.50

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 30.00 0.13 4.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 0.20 0.20 10.00 0.00 3.08

tareas tareas

0.33 2.60

100% 100%

pp m m Hm

148.50 30.00 30.00 0.25

100% 100% 100% 100%

0.38 0.10 0.04 197.07

14.63

100%

6.24

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Cachos de Toro Carretilla buggy

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

(A) Total Costo Directo (B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8"

8.5%

kg

(D)

Carmex Mininel Mecha rapida Cordon detonante

und und m m

2.00 30.00 2.00 8.00

100% 100% 100% 100%

1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

1.00

100%

11.68

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

A 1.20 x 2.40

a Perforación mts

VOLVER 1.37 90% 1.23

Total S/. S/.

CHIMENEA 1.2 m x 2.4 m

Total S/. /MET.

(Hasta 30 metros de altura) Datos Técnicos:

446.01 65.00 46.02 14.39 187.22 175.84 62.09 61.24 5.48 42.64 27.47 12.87 1.06 1.18 0.39 0.27 0.24 0.99 1.17 0.20 6.00 1.30 0.00 3.08 21.53 2.79 23.79 89.43 56.96 2.91 1.26 49.27 631.08 53.64 156.21 91.24

Tipo de roca: Ancho Labor: Largo Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 1.2 2.4 5.0 33 30.0 16.0 14.6

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

2.99 87.87 2.13 8.60 9.46 11.68 694.18

2 m x 2.4 m

s de altura)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 0.91 1.23 3.56 1.37 0.49

m m m3 mts

ESTRUCTURA DE COSTOS: CHIMENEA 1.50m x 1.50m Taladros Perforados /disparo Taládros cargados Factor de carga (Kg/taladro) :

26.0 23.0 0.6

DESCRIPCIÓN

Longitud efectiva Perforación mts Eficiencia perforación Rendimiento (m/disparo): UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea

0.2 0.2 0.1 1.30 1.30 1.30

Gln pp pp

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero electricista Mina Maestro Perforista Ayudante Operador Scoop

1.70 1.70 0.85 100% 100% 33%

191.06 135.26 169.18 144.02 135.26 191.06

0.25 117.00 117.00

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza kg pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 23.00 0.13 4.00 1.00

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 0.20 0.20 10.00 0.00 3.08

tareas tareas

0.43 2.60

100% 100%

pp m m Hm

117.00 30.00 30.00 0.25

100% 100% 100% 100%

0.38 0.10 0.04 197.07

12.80

100%

6.24

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Disco de jebe Taco de Arcilla Ocre Polvo Rojo Cachos de Toro Carretilla buggy

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick

(A) Total Costo Directo (B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 1 1/4" x 8"

8.5%

kg

(D)

Carmex Mininel Mecha rapida Cordon detonante

und und m m

2.00 23.00 2.00 8.00

100% 100% 100% 100%

1.50 2.93 1.06 1.08

Combustible Petroleo Scoop

Gln

1.00

100%

11.68

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

1.50m x 1.50m

a Perforación mts

VOLVER 1.37 90% 1.23

Total S/. S/.

CHIMENEA 1.5 m x 1.5 m

Total S/. /MET.

(Hasta 30 metros de altura) Datos Técnicos:

462.11 65.00 46.02 14.39 187.22 175.84 81.96 49.19 5.48 33.60 21.65 11.73 1.06 1.18 0.39 0.27 0.24 0.99 1.17 0.20 4.60 1.30 0.00 3.08 22.26 3.69 23.79 79.64 44.88 2.91 1.26 49.27 624.93 53.12 130.36 79.83

Tipo de roca: Ancho Labor: Largo Labor: Long. Barra (pie) NºTal. Frente NºTal. Cargados Factor de carga: kg explosivo

Dura 1.5 1.5 5.0 26 23.0 14.0 12.8

m m pies tal tal Kg/m Kg

Longitud de avance de perforación kilogramos/ taladro

2.99 67.37 2.13 8.60 9.46 11.68 687.51

5 m x 1.5 m

s de altura)

nicos:

Efic.Perf. Efic.Disp. Long. Carga Avanc.Efect. m³ / Disp. avance de perforación

90% 90% 0.91 1.23 2.78 1.37 0.56

m m m3 mts

COSTO EXPLOTACIÓN MÉTODO DE EXPLOTACIÓN: Corte y relleno convencional - perforacion vertical - relleno hidraulico Taladros Perforados /Guardia PRODUCCION POR TAJEO: Factor de carga (Kg/taladro) : Ancho labor (m)

35.0 177.6 0.4 0.8

DESCRIPCIÓN

Longitud efectiva Perforación mts Toneladas rotas por Guardia Rendimiento (ton/tal): Ancho minimo de minido (m) UNIDAD

CANT.

tarea tarea tarea tarea tarea tarea tarea tarea tarea tarea tarea

0.2 0.2 0.1 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30

Gln pp pp

INCIDENCIA

P.U. S/. / Unid

1.1 Mano de Obra Capataz Bodeguero Electricista Mina Maestro Perforista (Explotación) Ayudante (Explotación) Maestro Perforista (Limpieza) Ayudante (Limpieza) Maestro Motorista Ayudante Motorista Maestro Perforista (Relleno) Ayudante (Relleno)

0.15 0.15 0.08 100% 100% 34% 34% 27% 27% 5% 5%

191.06 135.26 169.18 144.02 135.26 144.02 135.26 144.02 135.26 144.02 135.26

0.25 178.50 178.50

100% 100% 100%

21.91 0.29 0.19

pieza pieza pieza pieza pieza pieza pieza pieza pieza kg

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00 35.00 0.13

100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 0.24 0.99 1.17 0.20 0.20 10.00

tareas tareas

0.00 4.32

100% 100%

pp m m

178.50 30.00 30.00

100% 100% 100%

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación 45 mm

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Barretilla de 6' Disco de jebe Taco de Arcilla Ocre Polvo Rojo

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

8.59 9.15

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2"

0.38 0.10 0.04

(A) Total Costo Directo (B)

UTILIDAD

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 7/8" x 7" Carmex Mininel Mecha rapida Cordon detonante

8.5%

kg und und m m

15.23 35.00 0.00 14.00 0.00

100% 100% 100% 100% 100%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B) (*) EXPLOSIVOS/ACCESORIOS DE VOLADURA Y COMBUSTIBLES NO APLICA UTILIDAD

6.51 1.50 2.93 1.06 1.08

VOLVER

l - relleno hidraulico

a Perforación mts por Guardia

1.55 13.60 0.39 0.80

e minido (m) Total S/. S/.

Corte y relleno convencional - perforacion vertical - relleno hidraulico

45.16

Datos Técnicos:

5.90 4.18 1.31 187.22 175.84 63.65 59.79 50.55 47.48 9.36 8.79

Tipo de roca: Semi-Dura 0.8 Ancho Labor: m 80.0 Longitud Labor: m 0.4 Burden: m 0.6 Espaciamiento: m 6.0 Long. Barra: ft 457.1 Nº taladros: tal 177.6 Toneladas: ton 35.0 NºTal / gdia: tal 2.1 Densidad: ton/m3 1.12 Factor de carga: kg/ton 5.0 Rendimiento Winche: ton/hr 6.60

5.48 51.26 33.02 1.02 1.06 1.18 0.39 0.27 0.24 0.99 1.17 0.20 7.00 1.30 2.90 0.00 39.49 5.34 68.47 2.91 1.26

EXPLOTACIÓN VETA

Total S/. / ton.

61.03 5.19 12.24 99.12 52.40 0.00 14.90 0.00 66.22

TACIÓN VETA perforacion vertical - relleno hidraulico

os Técnicos: Efic.Perf. Efic.Disp. Avanc.Efect. Ton/tal Ton/Gdia Rend. Relleno: kg/ tal eficiencia de perf Kg_Explosivo/tal

85% 85% 1.32 0.39 13.60 1.20 0.00 1.55

m ton ton m3/gdia m m

0.44

kg/tal

CUNETA 0.30 X 0.30 MTS Taladros Perforados Taladros cargados Log. Taladro (pies)

4.0 4.00 1.5

DESCRIPCIÓN

Eficiencia de perforación Avance por Guardía (ml)

UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

tarea tarea tarea tarea tarea tarea

0.2 0.2 0.2 1.30 1.30 0.10

0.12 0.12 0.12 100% 100% 20%

191.06 135.26 169.18 144.02 135.26 191.06

Gln pp pp

0.25 5.10 5.10

100% 100% 100%

21.91 0.22 0.35

pieza pieza pieza pieza pieza pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.39 0.24 0.99 0.20

tareas tareas

0.10 2.60

100% 100%

8.59 9.15

pp m m Hm

5.10 30.00 30.00 0.10

100% 100% 100% 100%

0.38 0.10 0.04 197.07

100% 100% 100% 100% 100%

6.51 1.50 2.93 1.06 1.08

1.1 Mano de Obra Capataz Bodeguero Electrisista Mina Maestro Perforista Ayudante Perforista Operador Scoop

1.2 Aceros de perforación Aceite de Perforación Barras de Perforación Brocas de perforación

1.3 Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" LLave Francesa 8" Barretilla de 4' Disco de jebe

1.4 Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

1.5 Equipos en Operación Perforadora Manguera de jebe de 1" Manguera de jebe de 1/2" Scooptram Sandvick (Carguio)

(A) Total Costo Directo (B)

Utilidad del Contratista

8.5%

(C)

Explosivos y Acc. Voladura Dinamita Semexa 65% 7/8" x 7" Carmex Mininel Mecha rapida Cordon detonante

0.31 4.00 4.00 0.02 2.50

(D)

Combustibles (*) Petroleo Scoop 4 Yd

Gln

COSTO TOTAL POR UNIDAD VALORIZADA (A+B+D)

0.4

100%

11.68

VOLVER 85% 18.00

Total S/. S/.

Total S/. /ml

4.46 3.16 3.95 187.22 175.84 3.82

21.02 0.25 0.18 0.22 10.40 9.77 0.21

5.48 1.11 1.81

0.47 0.30 0.06 0.10

1.06 1.18 0.39 0.39 0.24 0.99 0.20

0.25 0.06 0.07 0.02 0.02 0.01 0.06 0.01

0.86 23.79

1.37 0.05 1.32

1.96 2.91 1.26 19.71

1.43 0.11 0.16 0.07 1.09 24.54 2.09 1.25

2.03 5.99 11.72 0.02 2.69

0.26 4.67 26.89

MEJORAMIENTO DE CUNETA Rendimiento

25.0

DESCRIPCIÓN

m/gdia UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

tarea tarea tarea tarea tarea

0.2 0.2 0.2 1.30 1.30

0.084 0.084 0.084 100% 100%

pieza pieza pieza pieza pieza pieza pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 3.08 0.99 1.17 1.30

tareas tareas

2.60 0.00

100% 100%

8.59 9.15

Hm m m

0.40 30.00 30.00

100% 100% 100%

10.20 0.10 0.04

1.1. Mano de Obra Capataz Bodeguero Electrisista Mina Maestro Ayudante

191.06 135.26 169.18 144.02 135.26

1.2. Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" Carretilla buggy Barretilla de 4' Barretilla de 6' Barretilla de 8'

1.3. Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

1.4 Equipos en Operación Patilladora Manguera de jebe de 1" Manguera de jebe de 1/2"

(A) Total Costo Directo (B)

Utilidad del Contratista

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B)

VOLVER

Total S/. S/.

Total S/. /ml

3.21 2.27 2.84 187.22 175.84

14.86 0.13 0.09 0.11 7.49 7.03

1.06 1.18 0.39 0.27 3.08 0.99 1.17 1.30

0.38 0.04 0.05 0.02 0.01 0.12 0.04 0.05 0.05

22.34 0.00

0.89 0.89 0.00

4.08 2.91 1.26

0.33 0.16 0.12 0.05 16.46 1.40 17.86

LIMPIEZA DE CUNETA Rendimiento

25.0

DESCRIPCIÓN

1.1.

1.2.

1.3.

m/gdia UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

Mano de Obra Capataz Bodeguero Electrisista Mina Maestro Ayudante

tarea tarea tarea tarea tarea

0.2 0.2 0.2 1.30 1.30

0.08 0.08 0.08 100% 100%

191.06 135.26 169.18 144.02 135.26

Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" Carretilla buggy Barretilla de 4' Barretilla de 6' Barretilla de 8'

pieza pieza pieza pieza pieza pieza pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 3.08 0.99 1.17 1.30

Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

tareas tareas

2.60 0.00

100% 100%

8.59 9.15

(A) Total Costo Directo (B)

Utilidad del Contratista

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B)

VOLVER

Total S/. S/.

Total S/. /ml

3.21 2.27 2.84 187.22 175.84

14.86 0.13 0.09 0.11 7.49 7.03

1.06 1.18 0.39 0.27 3.08 0.99 1.17 1.30

0.38 0.04 0.05 0.02 0.01 0.12 0.04 0.05 0.05

22.34 0.00

0.89 0.89 0.00 16.13 1.37 17.50

LIMPIEZA DE VIA Rendimiento

1.1.

1.2.

1.3.

35.0

m/gdia

DESCRIPCIÓN

UNIDAD

CANT.

Mano de Obra Capataz Bodeguero Electrisista Mina Maestro Ayudante

tarea tarea tarea tarea tarea

0.2 0.2 0.2 1.30 1.30

0.060 0.060 0.060 100% 100%

Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" Carretilla buggy Barretilla de 4' Barretilla de 6' Barretilla de 8'

pieza pieza pieza pieza pieza pieza pieza pieza

2.00 2.00 1.00 1.00 1.00 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 3.08 0.99 1.17 1.30

Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

tareas tareas

2.60 0.00

100% 100%

8.59 9.15

(A) Total Costo Directo (B)

Utilidad del Contratista

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B)

INCIDENCIA

P.U. S/. / Unid

191.06 135.26 169.18 144.02 135.26

VOLVER

Total S/. S/.

Total S/. /ml

2.29 1.62 2.03 187.22 175.84

10.54 0.07 0.05 0.06 5.35 5.02

1.06 1.18 0.39 0.27 3.08 0.99 1.17 1.30

0.27 0.03 0.03 0.01 0.01 0.09 0.03 0.03 0.04

22.34 0.00

0.64 0.64 0.00 11.45 0.97 12.42

INSTALACION DE TUBERIA DE POLIETILENO DE 2" y 4" Rendimiento

160.0

DESCRIPCIÓN

1.1.

1.2.

1.3.

m/gdia UNIDAD

CANT.

Mano de Obra Capataz Bodeguero Electrisista Mina Maestro Ayudante

tarea tarea tarea tarea tarea

0.2 0.2 0.2 1.30 2.60

0.013 0.013 0.013 100% 100%

Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" Carretilla buggy Barretilla de 4' Barretilla de 6' Barretilla de 8'

pieza pieza pieza pieza pieza pieza pieza pieza

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100%

Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

tareas tareas

3.90 0.00

100% 100%

(A) Total Costo Directo (B)

Utilidad del Contratista

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B)

INCIDENCIA

VOLVER

IETILENO DE 2" y 4"

P.U. S/. / Unid

Total S/. S/.

Total S/. /ml

191.06 135.26 169.18 144.02 135.26

0.50 0.36 0.44 187.22 351.69

3.38 0.003 0.002 0.003 1.17 2.20

0.53 0.59 0.39 0.27 3.08 0.99 1.17 1.30

0.53 0.59 0.39 0.27 3.08 0.99 1.17 1.30

0.05 0.00 0.00 0.00 0.00 0.02 0.01 0.01 0.01

8.59 9.15

33.51 0.00

0.21 0.21 0.00 3.64 0.31 3.95

INSTALACION DE TUBERIA DE FIERRO DE 4" y 6" Rendimiento

40.0

DESCRIPCIÓN

m/gdia UNIDAD

CANT.

INCIDENCIA

P.U. S/. / Unid

tarea tarea tarea tarea tarea

0.2 0.2 0.2 1.30 2.60

0.053 0.053 0.053 100% 100%

pieza pieza pieza pieza pieza pieza pieza pieza

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

100% 100% 100% 100% 100% 100% 100% 100%

0.53 0.59 0.39 0.27 3.08 0.99 1.17 1.30

tareas tareas

3.90 0.00

100% 100%

8.59 9.15

1.1. Mano de Obra Capataz Bodeguero Electrisista Mina Maestro Ayudante

191.06 135.26 169.18 144.02 135.26

1.2. Herramientas Lampa Pico Combo 6 Lbs Llave Stilson de 8" Carretilla buggy Barretilla de 4' Barretilla de 6' Barretilla de 8'

1.3. Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

(A) Total Costo Directo (B)

Utilidad del Contratista

8.5%

COSTO TOTAL POR UNIDAD VALORIZADA (A+B)

VOLVER

DE 4" y 6"

Total S/. S/.

Total S/. /ml

2.01 1.42 1.78 187.22 351.69

13.60 0.05 0.04 0.04 4.68 8.79

0.53 0.59 0.39 0.27 3.08 0.99 1.17 1.30

0.21 0.01 0.01 0.01 0.01 0.08 0.02 0.03 0.03

33.51 0.00

0.84 0.84 0.00 14.65 1.25 15.89

TAREA ADMINISTRATIVA (Maestro) COSTOS DIRECTOS

Cantidad

Mano de Obra Maestro Ayudante

Unidad

Incidencia

P.U.(S/.)

Total S/.

tarea tarea

100% 100%

144.02 135.26

187.22 187.22 0.00

3% MO

Global

100%

5.62

5.62

1.30 0.00

tarea tarea

100% 100%

8.59 9.15

11.17 11.17 0.00

1.30 0.00 1.30

Herramientas Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua Total Costo Directo

204.01

Utilidad del Contratista

8.5%

17.34

TOTAL COSTO US$ / m

221.35

TAREA ADMINISTRATIVA (Ayudante) COSTOS DIRECTOS Mano de Obra Maestro Ayudante Herramientas Implementos de Seguridad Tareas sin ropa de agua Tareas con ropa de agua

Cantidad

0.00 tarea 1.30 tarea 1.30 3% de MO Global

1.30 0.00

Total Costo Directo Utilidad del Contratista TOTAL COSTO US$ / m

Unidad

tarea tarea

Incidencia

P.U.(S/.)

Total S/.

100% 100%

144.02 135.26

175.84 0.00 175.84

100%

5.28

5.28

100% 100%

8.59 9.15

11.17 11.17 0.00 192.29

8.5%

16.34 208.63

VOLVER

MOVILIZACION / DESMOVILIZACION Y CAMPAMENTOS DESCRIPCION 1 Movilización - Flete Jumbo 01 brazo - Flete Scooptram 4.0 yd3 - Flete compresoras (02) - Flete winches y maq. Perf. - Flete menaje de campamentos - Camión servicios autotransportado - Camioneta autotransportado

UNID.

CANT.

PRECIO UNIT.($)

Viaje Viaje Viaje Viaje Viaje Viaje Viaje

1.0 1.0 0.0 1.0 1.0 1.0 1.0

3,500 3,500 3,500 2,000 3,000 500 400

Piezas Piezas Piezas Piezas Piezas Piezas Piezas Piezas

266 133 266 266 68 34 34 34

4.50 36.00 3.55 6.00 124.94 22.50 6.00 100.00

Viaje Viaje Viaje Viaje Viaje Viaje Viaje

1.0 1.0 0.0 1.0 1.0 1.0 1.0

3,500 3,500 3,500 2,000 3,000 500 400

TOTAL MOVILIZACIÖN EQUIPOS US$ 2 Equipamiento Campamento - Frazadas - Colchones - Coberturas o cubrecamos - Sábanas - Camarotes - Armarios - Lockers - Estufas TOTAL EQUIP. CAMP US$ 3 Desmovilización - Flete Jumbo 01 brazo - Flete Scooptram 4.0 yd3 - Flete compresoras (02) - Flete winches y maq. Perf. - Flete menaje de campamentos - Camión servicios autotransportado - Camioneta autotransportado TOTAL DESMOVILIZACIÖN EQUIPOS US$

VOLVER

ENTOS COSTO TOTAL (US$) 3,500.0 3,500.0 0.0 2,000.0 3,000.0 500.0 400.0 12,900.0

1,197.0 4,788.0 944.3 1,596.0 8,496.0 765.0 204.0 3,400.0 21,390.2

3,500.0 3,500.0 0.0 2,000.0 3,000.0 500.0 400.0 12,900.0