tf1? /-1 t1 /vv! Republic of the Philippines DEPARTMENT
ov~~-.l.D/7
OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY Manila
FEB 2 8 2017 DEPARTMENTORDER )
22
NO. _ Series of 2017~~>9.t7
) ) )
SUBJECT: Implementation of the Quality Management System (QMS) Manual in conformance with the requirements of ISO 9001:2015
In line with the Department's policy to continuously improve the delivery of its services, all Bureaus, Services, Unified Project Management Offices, Regional Offices and District Engineering Offices are hereby required to implement the processes and mandatory procedures in the Quality Management System (QMS) Manual. Copies of this Manual (DPWH-QMSM-Revision No.3) will be provided by the Records Management Division (RMD) of the Human Resource and Administrative Service (HRAS). This Order shall take effect imme' of 2016.
SIS ersecretary Officer-in-Charge
11.1.3 NJM/NSP/BEY Department
of Public Works and Highways Office of the Secretary
1111111111111111111111111111111111111
WIN7P01517
Iy and shall supersede Department Order No. 93 Series
Department of Public Works and Highways
Quality Management System Manual Table of Contents Section 1. 1.1
1.2 1.3 1.4 1.5 1.6 1.7 Section 2.
2.1 2.2 Section 3. 3.1
3.2 3.3
Page No.
03 1 of 3
Scope Process Approach
Leadership Management Commitment 3.1.1 Core Values 3.1.2 Mandate 3.1.3 Vision 3.1.4 Mission Quality Policy Responsibility, Authority and Communication 3.3.1 Responsibility and Authority 3.3.2 Leadership 3.3.3 Management Representatives 3.3.4 Communication
Planning
Operations
5.5
Revision No.:
Quality Management System
Section 5.
5.3 5.4
DPWH-QMSM
Profile Functions Bureaus Services Unified Project Management Offices Regional Offices District Engineering Offices
Strategic Direction Risks and Opportunities Objectives and Targets Planning of Changes
5.2
FEB 2
Doc. Code:
Organizational Profile
Section 4. 4.1 4.2 4.3 4.4
5.1
Issue Date:
Planning of Product Realization 5.1.1 Project Identification 5.1.2 Formulation of Plans and Investment Programs 5.1.3 Project Planning Customer Related Processes 5.2.1 Determination of Requirements Related to the Product 5.2.2 Review of Requirements Related to the Product 5.2.3 Customer Communication Surveys and Design Development Production and Service Provision 5.4.1 Control of Production and Service Provision 5.4.2 Validation of Processes for Production and Service Provision 5.4.3 Identification and Traceability 5.4.4 Property Belonging to Customers or External Providers 5.4.5 Preservation of Product (Infrastructure) Control of Nonconforming Outputs
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
2017
Department of Public Works and Highways
•
Quality Management System Manual Table of Contents
Section 6. 6.1 6.2
6.3 6.4
6.5 6.6 6.7
6.8 Section 7. 7.1 7.2
7.3 7.4
Section 8. 8.1 8.2
2Q17
Issue Date: Doc. Code: Revision No.: Page No.
DPWH-QMSM
03 2 of 3
Support Processes Procurement Management 6.1.1 General Human Resources Management 6.2.1 General 6.2.2 Competence, Training and Awareness Financial Management Physical Resource Management 6.4.1 Facilities and Work Environment Management 6.4.2 Equipment Fleet Management 6.4.3 Survey, Laboratory and Field Testing Equipment Management Information Management Legal Services Documentation Management 6.7.1 Document and Data Control 6.7.1.1 General 6.7.1.2 Document Approval and Issuance 6.7.1.3 Document and Data Changes 6.7.2 Records Control Organizational Knowledge
Petformance Evaluation General Monitoring and Measurement 7.2.1 General 7.2.2 Stakeholder Satisfaction 7.2.3 Internal Audit 7.2.4 Monitoring and Measurement of Processes 7.2.5 Monitoring and Measurement of Products Analysis of Data Management Review 7.4.1 General 7.4.2 Review Input 7.4.3 Review Output
Improvement General Nonconformity and Corrective Action
Mandatory Procedures Control of Documents, DPWH-QMSP-01 Control of Records, DPWH-QMSP-02 Internal Quality Audit, DPWH-QMSP-03 Control of Nonconforming Output, DPWH-QMSP-04 Corrective Action, DPWH-QMSP-05 Management Review, DPWH-QMSP-06
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual Table of Contents
Issue Date:
FEB
Doc. Code:
DPWH-QMSM
Revision No.: Page No.
Annexes A
Relevant Interested Parties
B
Risk Register
C
Opportunity Register
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
03 3 of 3
Department of Public Works and Highways
•
Quality Management System Manual
Issue Date:
FEB 2 B 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
1 of 37
Page No.
Section 1. Organizational Profile 1.1
Profile The Department of Public Works and Highways (DPWH) is the state's engineering and construction arm. As a public service agency, its primordial concern is to find the most effective and efficient ways to serve its clientele - the Filipino people. The DPWH is one of the largest organizations in the executive branch in terms of size and budget.
It is composed of six (6) Bureaus, nine (9)
Services, 17 Regional Offices (ROs), over 180 District Engineering Offices (DEOs) and five (5) Unified Project Management Offices (UPMOs).
1.2
Functions The Department
of Public Works and Highways (DPWH) is tasked to continuously develop its
technology for the purpose of ensuring the safety of all infrastructure facilities and securing for all public works and highways the highest efficiency and quality in construction.
1.3
Bureaus a. Bureau of Design (BOD) conducts, supervises and reviews field surveys, schemes, designs, specifications, estimates, tender/contract
documents covering the technical design aspects of
the DPWH projects and that of other government
agencies in accordance with current
guidelines, criteria and standards.
b. Bureau of Construction (BOC) reviews and evaluates programs, estimates, contract documents, progress reports for civil work projects, as well as inspects, checks and construction
projects and provides technical assistance to DPWH implementing
monitors
offices and
other government agencies.
c. Bureau of Maintenance (BOM) handles the maintenance of the nation's public works and highways
facilities.
Relative to this, it conducts field inspections to effectively
maintenance activities of the DEOs; oversees/coordinates
monitor
quick response mechanisms with
ROs and DEOs relating to repair works on calamity-damaged infrastructure.
d. Bureau
of
Equipment
(BOE) monitors compliance to standards, operation and
maintenance of all DPWH land and water-based equipment. It evaluates the Department's equipment requirements and recommends its acquisition and allocation. the DPWH equipment
It takes custody of
including service vehicles; undertakes the maintenance
of service
vehicles and equipment at the Central Office; and administers equipment rental.
e. Bureau of Research& Standards (BRS) undertakes research studies and pilot trials of new materials/technologies
to
improve
the
quality
of
government
infrastructure
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
projects;
Issue Date: Department of Public Works and Highways
•
Doc. Code:
Quality Management System Manual
f
[
DPWH-QMSM
Revision No.:
03
Page No.
2 of 37
formulates specifications, standards and guidelines; and conducts quality testing of various construction materials.
f.
Bureau of Quality and Safety (BQS) monitors the implementation of policies to ensure the safety of infrastructures,
and secure the highest efficiency and quality in construction
through checking of compliance with approved plans and specifications. BQS undertakes the analysis and evaluation
of accident data, annual average daily traffic
(MDT)
data and
weigh bridge data.
1.4
Services a. Planning Service (PS) provides technical services relating to planning, programming and project development. Medium-Term
It prepares the Department's
Public
Infrastructure
Investment
Program
Medium Term Development
including
the
formulation
of
Plan and
the
Annual
Program (AlP) for presentation to and approval of Congress.
b. Public-Private Partnership Service (PPPS) undertakes procurement,
the
planning,
marketing,
monitoring and management of projects as provided for under R.A. 6957 (BOT
Law) and amended under R.A. 7718.
c. Procurement Service (PrS) serves as the main support unit of the various Bids and Awards Committees (BACs) of the Central Office and is responsible for the procurement of contract for civil works,
consultancy,
and goods and services as prescribed
in the DPWH Annual
Procurement Plan (APP); as well as for the registrations of contractors.
d. Human Resources and Administrative Service (HRAS) implements human resource management Placement;
Performance
Development. property
and development
Management;
the integrated
plan, namely: Recruitment,
Rewards
and
Recognition;
and,
Selection and Learning
It provides services related to human resource development,
management,
and
supply and
security and maintenance of building facilities, cash management,
records management and library facilities.
e. Finance Service (FS) provides services related to budgeting, accounting and all financial
f.
housekeeping
matters including preparation
of budget proposals, pursuing formal budget
authorizations,
and undertaking budget execution and control.
Information Management Service (IMS) manages and maintains the DPWH information and communications
technology (lCT) resources and carries out researches on development
and future trends. It undertakes activities to institute IT-enabled develops and maintains the enterprise-wide
process improvements;
and individual unit applications including the
Department's websites; plans and implements IT Training programs, and provides technical support to IT users. BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual
Issue Date:
FEB 2 8 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
3 of 37
Page No.
g. Legal Service (LS) provides services in the areas of contract letting and litigation, legislative affairs and research, complaints and investigation. It prepares Department contracts and legal instruments, reviews and interprets contracts and agreements entered into by the Department, and evaluates legal proposals. It also undertakes the acquisition of site and location as rightof-way for national infrastructure
projects.
h. Stakeholders Relations Service (SRS) manages the social marketing and mobilization programs
of the Department
specifically non-government
to strengthen
its relationship
with
external
stakeholders,
organizations (NGOs) and Civil Society Organizations
(CSOs), so
they can take an active part in governance.
i.
Internal Audit Service (IAS) advises the Secretary on all matters related to management control and operations audit. It conducts management
and operations audit, review and
appraisal of systems and procedures, organization structures, assets management practices, and reports. It analyses and evaluates management deficiencies and recommends courses of action.
1.5
Unified Project Management Office (UPMO)
undertakes
project
operations
and
management; project reporting, evaluation and monitoring; coordination with various stakeholders and post project completion, and mainstreaming of project concerns in regular activities.
It is
composed of the following clusters:
a. Bridges Management Cluster (BMC) undertakes project implementation,
supervision and
monitoring of foreign and locally funded bridge and flyover projects located nationwide until its completion, in accordance with the approved plans and specifications.
b. Flood Control Management Cluster (FCMC) undertakes project implementation technical research on water and sediment-related
and
disaster mitigation; formulates programs on
capacity building in flood management and sabo engineering;
evaluates the flood control
system in river basins; and prescribes guidelines on the conduct of post-disaster survey and assessment.
c. Roads Management Cluster I (RMC-I) Bilateral undertakes the overall implementation, supervision
and monitoring
of projects
funded
through
bilateral
agreements
until
its
completion, in accordance with the approved plans and specifications.
d. Roads Management Cluster II implementation,
(RMC-II)
Multilateral undertakes
the
overall
supervision and monitoring of projects funded through multilateral agencies
such as Asian Development
Bank (ADB) and World Bank (WB) until its completion,
accordance with the approved plans and specifications.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
in
Department of Public Works and Highways
•
Quality Management System Manual
Issue Date:
2017
Doc. Code:
DPWH-QMSM
Revision No.: Page No.
03 4 of 37
e. Buildings Management Cluster (BuMC) undertakes the administration and enforcement of the provisions of the National Building Code of the Philippines (P.O. 1096) and its IRR, and the monitoring of projects of other national government agencies assigned to this office.
Department of Public Works and Highways Organizational Chart Per Department Order No. 227, s. 2016, dated December 15, 2016
SECRETARY At1achedAgencies - MetropolItan'Newcl1cs an! Sewerage System (~) - RoiIdIloard
..
-
Internal Audit Service
"'
I Undersecretary for Planning & ppp
T
Undersecretary for Support Services
Undersecretary for Technical Services
Undersecretary fOi Legal Affairs & Priority Projects
I
I Assistant Secretary for Technical Services
Undersecretary for Regional Operations In Luzon Assistant Secretary for Regional Q>e!ations in Luzon
Assistant Secretary for Support Seivices
I Planning Service
Ekl'eau of Design
Procurement Service
Legal Service
8 Regional00ites in Luzon CAR NCR
Nlk-PriYate Pertnership Service
EkJ'eau of Construction &nau of Maintenance &nau of EQUipment
~
Resource &. Mmistrative Service
Finance Service
Stakeholders Relations Service
RegionI RegionII RegionIII RegionIV-A Region1V-8 RegionV
Assistant Secretary for Regional Q>e!ations in VISa"""
Assistant Secretary for Regional Q>e!ations in Mindanao
RegionVI RegionVII RegionVIII NIR
EngineeringOffices
5 Regional00ites in Mindanao RegionIX RegionX Regm XI RegionXII RegionXIII
46 District EngineeringOffices
Information Management Service
IlIidges Management Ouster Rood Control Management Ouster • Roads Management Ouster I
-..,
Roads Management Ouster II
~~
!lljldings &. Spedal projects auster
&Jreau of Researd1 &. Standards
EkI'eau of
Undersecretary for upm Operations
I 4 Regional00ites in Vlsayas
§§ Engineering00ites
1
Undersecretary for Regional Q>e!ations In IfIS-Min
• - The oversight functions over the flood Control Management Cluster under the UPMOshall be shared by the Undersecretaries for Regional OperatIons based on the" areas of assignment Withthe Undersecretary for UPMOOperations as defined in D.O. 87. 5.2016.
Figure 1.1 DPWH Organizational Chart
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date: Department of Public Works and Highways
Quality Management System Manual
•
1.6
Doc. Code:
DPWH-QMSM
Revision No.:
03
Page No.
5 of 37
Regional Offices (ROs)
a. Office of the Regional Director provides overall supervision and administration of technical, financial,
human
resource
and administrative
functions
of the
Region and all District
Engineering Offices (DEOs) under its jurisdiction.
i.
Legal Staff prepares memoranda of agreement and other legal instruments;
reviews,
interprets and processes contract agreements and other instruments entered into by the Region and the District Engineering Offices under its jurisdiction;
and provides legal
services in the acquisition of right-of-way for infrastructure projects in the Region.
ii. Procurement Staff manages and administers the procurement activities and processes of the Regional Office, including provision of Secretariat and technical support services to the Regional Bids and Awards Committee; maintains and administers the registration and accreditation of suppliers for goods and services in the Region; and monitors compliance with procurement processes and guidelines of District Engineering Offices.
iii. Information and Communication Technology Staff manages and maintains the wide area network of the Region which includes network infrastructure,
enterprise servers and
technology environment for both voice and data; and provides support services to Regional web data sources.
iv. Public Affairs and Information
Staff undertakes information
dissemination
Regional Office; manages media-related activities by improving coordination,
in the
expanding
linkages and establishing network with peers in the Region, Districts and Head of Office for quick response to issues and feedback; is also responsible for matters concerning CSO partnerships and customer feedback management.
b. Planning and Design Division implements pertinent laws, policies, standards, guidelines and procedures in the planning and design of roads, bridges, flood mitigation buildings and other public works projects; infrastructure
structures,
reviews, updates and consolidates the annual
program of the Region including the long and medium term infrastructure
development plans. It also reviews, updates and recommends the approved plans, Program of Work (POW), and estimates of infrastructure
projects within the Region and its District
Engineering Offices; and recommends for the approval, by the Central Office, of projects beyond the level of its delegated authority.
c. Construction Division supervises and implements infrastructure projects in accordance with approved
plans, specifications,
and delegated authority
oversees, assists, inspects and monitors infrastructure Engineering
Offices, Local Government
of the Regional Office.
It also
projects implemented by the District
Units (LGUs) and other government
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
agencies -
Issue Date: Department of Public Works and Highways
Quality Management System Manual
•
FEB 2
B
2017
DPWH-QMSM
Doc. Code:
03
Revision No.:
6 of 37
Page No.
including those covered by Memoranda of Agreement - in accordance with existing standards
and guidelines, and within its approved level of authority.
d. Maintenance Division implements guidelines and procedures for the effective maintenance of infrastructure
and to ensure that
the annual
maintenance
works,
programs,
and
performance budget are properly implemented. It oversees, inspects, verifies, monitors and evaluates the maintenance of infrastructure
projects implemented by the District Engineering
Offices in accordance with existing standards and guidelines, and within its approved level of authority.
e. Equipment Management Division manages and monitors the use of equipment fleet in the Regional Office both for regular operations and for quick response during calamities and emergency situations.
It advises the Regional Director regarding inter-DEO transfer and
repositioning of Basic Highway Maintenance Equipment (BHME) to ensure strategic Regionwide
equipment
rehabilitation
allocation,
distribution
and utilization.
It
also undertakes
equipment
upon the joint approval of the Regional Director and the Director of the BOE.
f. Quality Assurance and Hydrology Division monitors the implementation
of Quality
Assurance Program of the Region and District Engineering Offices in accordance with the quality assurance policies of the Department. It operates and maintains the Regional Testing Laboratory and conducts testing of construction materials for projects undertaken by the RO, UPMO, DEOs, LGUs and other government agencies within its area of jurisdiction.
g. Administrative Division advises the Regional Director on all matters pertaining to human resource
management,
management,
and
human
supply
and
resource
development,
property
management.
records It
management,
recommends
the
cash needed
organizational development for the Regional and District Engineering Offices to the Central Office.
h. Finance Division provides the Regional Office with coordinated services on budgeting, accounting and other financial services; implements and improves Financial Management and Internal Control System. It also prepares, analyzes and consolidates the budget proposals of the Region, prepares management reports, and gives advice to the Regional Director and District Engineers on matters relating to fiscal administration.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual
Issue Date:
FFR 2 8 2017
Doc. Code:
DPWH-QMSM
Revision No.:
03 7 of 37
Page No.
LEGAL STAFF
PROCUREMENT STAFF
INFORMATION AND COMMUNICATION TECHNOLOGY STAFF
DISTRICT ENGINEERING OFFICES
PUBLIC AFFAIRS AND INFORMATION STAFF
PLANNING AND DESIGN DIVISION
CONSTRUCTION DIVISION
MAINTENANCE DIVISION
EQUIPMENT MANAGEMENT DIVISION
QUALITY ASSURANCE AND HYDROLOGY DIVISION
ADMINISTRATIVE DIVISION
FINANCIAL DIVISION
Figure 1.2 Organizational Chart of Regional Offices 1.7
District Engineering Offices a. Office of the District Engineer provides overall supervision and administration of technical, financial, human resource and administrative activities of the District Engineering Office.
i.
Procurement Staff administers procurement activities and processes of the District Engineering Office.
ii. Information and Communication Technology Staff manages and maintains the wide area network of the District which includes the network infrastructure, and technology environment
enterprise servers
for both voice and data; and provides support services to
Regional web data sources.
iii. Public Information Staff undertakes information dissemination in the District; manages media-related
activities by improving coordination,
expanding linkages, and establishing
network with peers in the Region, Districts and the Head of Office for quick response to BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Issue Date:
E
Doc. Code:
DPWH-QMSM
Quality Management System Manual
Revision No.: Page No.
issues and feedback;
is responsible for matters pertaining
03 8 of 37
to CSO partnerships
and
customer feedback management.
b. Planning and Design Section implements pertinent laws, policies, standards, guidelines and procedures in the planning and design of roads, bridges, flood mitigation structures, buildings and other public works projects; reviews, updates, and consolidates the annual infrastructure program, and recommends the approved plans, POW, and estimates of infrastructure projects within the DEO.
c. Construction Section supervises and implements infrastructure projects in accordance with approved plans, specifications and delegated authority of the DEO.
d. Maintenance Section implements guidelines and procedures for effective maintenance of infrastructures
and ensures that the annual maintenance works, programs and performance
budget are properly implemented within the DEO.
e. Quality Assurance Section monitors the implementation of Quality Assurance Program of the DEO in accordance with the quality assurance policies of the Department.
f. Human Resource and Administrative Section advises the District Engineer on all matters pertaining
to
human
resources
management,
human
resource
development,
records
management, cash management, and supply and property management.
g. Finance Section provides the DEO with coordinated services on budgeting, accounting and other financial services; implements and improves Financial Management and Internal Control System.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date: Department of Public Works and Highways
•
Doc. Code:
Quality Management System Manual
DPWH-QMSM
Revision No.:
03
Page No.
9 of 37
PROCUREMENT STAFF
INFORMATION AND COMMUNICATION TECHNOLOGY STAFF
PUBLIC INFORMATION STAFF
PLANNING AND DESIGN SECTION
CONSTRUCTION SECTION
MAINTENANCE SECTION
QUALITY ASSURANCE SECTION
HUMAN RESOURCE AND ADMINISTRATIVE SECTION
FINANCIAL SECTION
Figure 1.3 Organizational Chart of District Engineering Offices
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual
2017
Issue Date:
FES 2 8
Doc. Code:
DPWH-QMSM
Revision No.: Page No.
03 10 of 37
Section 2. Quality Management System 2.1
Scope Based on analysis of the issues of concern, interests of stakeholders, and in consideration of its products and services, the DPWH has determined the scope of the management system as follows: Public administration
covering planning, design, construction, and maintenance of infrastructures,
national highways, flood control, water resources development system and other public works in accordance with the national development objectives. The QMS applies to all Bureaus, Services, Regional Offices (ROs), District Engineering Offices (DEOs) and Unified Project Management Offices (UPMOs). All requirements of ISO 9001 Standard are applicable to DPWH QMS.
2.2
Process Approach The DPWH has adopted a process approach for its QMS. The identification and management of high level processes reduce the potential for nonconforming processes or after delivery. Nonconformities
products and services found during final
and risks are identified and actions are taken within
each of the high level processes. Each high level process has: a. Quality objective b. Applicable risks and opportunities c.
Applicable inputs and outputs
d.
Responsibilities and authorities
e. Supporting resources f. Criteria and methods used to ensure effectiveness of the process
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual
Issue Date:
FEB 2 8 2011
Doc. Code:
DPWH-QMSM
Revision No.: Page No.
03 11 of 37
These high level processes, their sequence and interaction are illustrated in the DPWH process model.
DPWH PROCESS MODEL Customers and Relevant Interested Parties o Genera Pubic o I-Iotorists
o Pedestrians o CMI Sac' Organilations o Contractors
Customer
o Consultants o SuppIiefs o Business SectDr
Satisfaction
o~~
o NatiooaI Government
~ies o lee Govemmeot Aoencies o 0tM GoYemrnen Aoencies
o IntemaI Stakeholders
Products and
Requirements
1.
Services
N;-.t"odc(l:)' T••.-to:.: . El31u:./j:(1 ;0:
2.
~'O;;doo:c1 N,1'1.Je~'C(tUTlin;
I~."..· E',,~ .(J1
J.. !C-onltl ~0C;I:):C'lS
F:o?:k.o:c1
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
Issue Date:
FEB 2 ~ 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
12 of 37
Page No.
Section 3. Leadership 3.1
Management Commitment 3.1.1
Core Values •
Public Service: Anticipating
and responding to the needs of all stakeholders
and
satisfying their needs through quality effort, DPWH officials and employees shall deliver the kind of facilities and services that are responsive to the needs of the Filipino people.
•
Integrity:
Conducting one's business in a transparent,
honest, and ethical manner,
DPWH officials and employees shall maximize the effectiveness of the public's resources entrusted
to them,
practice simple living, have the moral courage to make tough
decisions, and to do what is right for the nation. They shall do the right things the right way.
•
Professionalism: Taking pride in one's work and committed to the pursuit of excellence, DPWH officials and employees shall act competently, accountability
ethically,
diligently,
and with
and dignity in their areas of expertise. They shall be given challenging
assignments and training, and promotions shall be based on merit.
•
Excellence: By continuously pursuing the highest quality of work in serving the public, DPWH officials and employees shall deliver the highest quality results beyond what is expected and required of them - on time, just in time, and all the time.
•
Teamwork: Working together in an environment of trust, fairness, respect, cooperation and communication,
DPWH officials and employees shall focus their efforts
in the
attainment of the vision, mission and goals of the Department.
3.1.2
Mandate The Department of Public Works and Highways (DPWH) is one of the three departments of the government
undertaking
major infrastructure
undertake (a) the planning of infrastructures,
projects. The DPWH is mandated
to
such as national roads and bridges, flood
control, water resources projects, and other public works; and (b) the design, construction and maintenance of national roads and bridges, and major flood control systems.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
• 3.1.3
Quality Management System Manual
Issue Date:
FEB 2 B 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
13 of 37
Page No.
Vision By 2030, DPWH is an effective and efficient government agency, improving the life of every Filipino through quality infrastructure.
3.1.4
Mission To provide and manage quality infrastructure facilities and services responsive to the needs of the Filipino people in the pursuit of national development objectives.
3.2
Quality Policy The DPWH Executive Committee regards its QMS as a strategic asset that will help in the continual improvement
of its systems. For this purpose, the following
statement
on Quality Policy is
established: We commit to provide quality, safe, and environment-friendly
public infrastructure
facilities that will improve the life of every Filipino. We commit to comply with all requirements and to continually improve effectiveness and efficiency in serving the public. We endeavour to implement the RIGHT PROJECTSat the RIGHT COST determined through transparent and competitive bidding; with the RIGHT QUALTIY, according to international
standards;
project implementation; and committed
delivered
RIGHT ON TIME through
close monitoring
of
and carried out by the RIGHT PEOPLE who are competent
to uphold the values of public service, integrity,
professionalism,
excellence, and teamwork.
3.3
Responsibility, Authority and Communication 3.3.1
Responsibility and Authority The present mandate of the DPWH is outlined in the approved Organizational Structure under Executive Order 366, series of 2004. The duties and responsibilities of DPWH officials are periodically defined and communicated -as needed - within the organization, and further delineated in Functional Charts, Position Description Forms (PDFs), Qualification Standards, and other QMS documents.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date: Department of Public Works and Highways
• 3.3.2
Quality Management System Manual
Doc. Code:
DPWH-QMSM
Revision No.: Page No.
03 14 of 37
Leadership The Secretary provides evidence of leadership and commitment implementation
to the development
and
of the QMS and continual improvement of its effectiveness by:
a. taking accountability for the effectiveness of the QMS; b. ensuring that the quality policy and quality objectives are established for the QMS and are compatible with the organization's context and strategic direction; c.
ensuring the integration
of the QMS requirements
into the organization's
business
processes; d. promoting the use of the process approach and risk-based thinking; e. ensuring that the resources needed for the QMS are available; f.
communicating the importance of effective QMS and of conforming to the requirements;
g. ensuring that the QMS achieves its intended results; h. engaging, directing, and supporting persons to contribute to the effectiveness of the QMS; i. j.
promoting improvement; and, supporting other relevant management roles to demonstrate his leadership as it applies to his areas of responsibility.
3.3.3
Management Representatives The Secretary designates an Overall Quality Management Representative, a Deputy Quality Management Engineers
Representative, as
Office
Quality
Bureau/Service/RegionaIjProject Management
Directors,
Representatives.
These
and
Management
Representatives have the defined authority to: a. Oversee the overall affairs of the QMS and not only the operation of function areas; b. Initiate
the QMS activities
and monitor
its implementation,
as a delegated
task from Top Management; c.
Ensure that processes needed by the QMS are established, implemented and
d.
maintained; Ensure the promotion
of awareness of customer requirements
throughout the
organization; and, e. Act as liaison with external parties on matters related to the QMS.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
District
Department of Public Works and Highways
• 3.3.4
Quality Management System Manual
Issue Date:
FEB 2 8 2017
Doc. Code:
DPWH-QMSM 03
Revision No.: Page No.
15 of 37
Communication The Executive Committee ensures that the internal and external communications procedures are in place. Internal and external communications, including communications regarding the effectiveness of the QMS, are carried out in accordance with a procedure which sets out a process to ensure that written
and verbal communications
are adequately
preserved, distributed, and acted upon.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
recorded,
Department of Public Works and Highways
•
Quality Management System Manual
F
Doc. Code:
DPWH-QMSM
Revision No.: Page No.
2
2017
Issue Date:
03 16 of 37
Section4. Planning 4.1
Strategic Direction The DPWH reviews and analyzes the key aspects of the organization and its stakeholders to determine its strategic direction. This involves: a.
Understanding the core products and services, and scope of the Quality Management System (QMS).
b. Identifying
stakeholders who receive products and services, or who may be impacted by them,
or those parties who may otherwise have a significant interest in DPWH. These parties are identified in the document Relevant Interested Parties Matrix (RIPM). c.
Understanding internal and external issues that are of concern to DPWH and its interested parties and also identified in the RIPM. Many such issues are identified through an analysis of risks facing either DPWH or the interested parties. Such issues are monitored and updated - as appropriate - and discussed as part of management reviews.
These information
are used by the Executive Committee to determine the organization's strategic
direction. This is defined in records of management review and periodically updated as conditions and situations change.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
Issue Date:
FES' 2 8 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
17 of 37
Page No.
VISION
STRATEGY MAP 2022 Department 01 Public Works
DPWH is an effective and efficient government agency. improving the life of every Filipino through quality infrastructure.
and Highways
Right Project. Right Cost. Right Duality, Right on Time, Ri ht People
Inr: ease
1'03
P ov"de tha engine3~ing solution safa y onC8rns
a
Conform 'tn esign standards
Instit tionalize mul"i-year plann:ng
Co nect COIlYErgeice roa projects 0 e national r ad networ
'01'
, urture a cui ure f ethical'nnDV3 'on 0 ccntinuous learning
MISSION
Mligate ood damaga bas'ns
Mae inte~na ional standard Lr road sur' ace quality
network capacity
onst uct new roads S br'dges seamless trans~lor· systa
lives S properties protected from natural disasters
Invoved road quatrty S safety
Reduced travel time
0
major ri "e
BuiL:!disaster-ra . ien 'ruet:!. as fn calamit' -pro 18areas
road
Expedite proeu a
nt
D OCBSS
Augment pe sennelS enhance conpetencies
On
m Iy with m intanane standards
E aMe the co e processes ."ith the la est ajl~.ro ria :: tec ology
pti he e ipmeot uti ization 0 increase absorptive apaci
COREVALUES
.
To provide and manage quality infrastructure faci~ties and services responsive to the needs olthe FaipinD people in the pursuit 01 national development objectives.
Public Service. Integrity. Professionalism. Excellence. Teamwork
Figure 4.1 DPWHStrategy Map
4.2
Risks and Opportunities The DPWH considers risks and opportunities opportunities
when taking actions within the QMS. Risks and
are identified as part of understanding the internal and external issues that are of
concern to the organization, its interested parties, and throughout all other activities of the QMS. Risks and opportunities are managed in accordance with the Risk and Opportunity Registers. These documents define how risks are managed in order to minimize its "likelihood" and "impact", and how opportunities
are tapped to increase its likelihood and benefit.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
4.3
Quality Management System Manual
Issue Date:
FES' 2 B 2011
Doc. Code:
DPWH-QMSM
Revision No.:
03 18 of 37
Page No.
Objectives and Targets
The DPWH Executive Committee ensures that quality objectives, including those needed to meet the requirements for the delivery of projects, are established at relevant functions and levels within the organization. Each process has at least one objective which is a statement of the intent of the process. Each objective is supported by at least one metric which is then measured to determine the process' ability to meet the quality objective. The specific quality objective for each process is defined in the scorecards. Metrics data are measured and gathered by process owners or other assigned personnel and are presented to the Executive Committee during Management Review. These data are analyzed by the Executive Committee to set goals and to make adjustments for the purposes of long-term continual
improvement.
Review of the performance
of these objectives
is recorded in the
Management Review minutes. When a process does not meet a goal, or a problem is encountered within a process, the corrective action process is implemented to resolve the issue.
4.4
Planningof Changes When DPWH determines the need for changes to the QMS or its processes, these changes are planned, implemented, and then verified for effectiveness.
If the change necessitates creation of
a new document or revision of an existing one, the document is changed in accordance with the Control of Documents Procedure.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
FES' 2
Issue Date: Department of Public Works and Highways
•
DPWH-QMSM
Doc. Code:
Quality Management System Manual
2017
B
03
Revision No.:
19 of 37
Page No.
Section 5. Operations 5.1
Planning of Product Realization 5.1.1. Project Identification The Planning Service classifies projects by Major Final Output such as national road network services, flood management services, and maintenance and construction services of other infrastructures. It categorizes these projects under various programs (i.e., roads and bridges, flood control and drainage, water supply and sewerage, and other infrastructures)
and can
be funded from local, foreign or public-private partnership funding sources. Project identification and prioritization are based on the outputs of planning applications such as the Pavement Management System (PMS) using the Highway Development Management (HDM-4), the Bridge Management System (BMS), and area development surveys, master plans, regional development plans and convergence programs. These are undertaken by the DPWH in coordination with other concerned entities and stakeholders such as NEDA, Regional Development Council (RDCs) and other National Government Agencies (NGAs), consistent with the national development goals and objectives. The DPWH established a planning process involving the use of planning tools for an objective selection
and
prioritization
policy of implementing
of road and bridge
projects,
consistent with
the
DPWH
the right projects. This planning process starts with data collection
conducted by the District Engineering Offices under the supervision of the Regional Offices. The data collected are stored in centralized databases: the Road and Bridge Information Application
(RBIA) managed by the Planning Service, and the Road Traffic Information
Application (RTIA) managed by the Bureau of Quality and Safety. The data in the RBIA and RTIA are used in the objective selection and prioritization of road and bridge projects. For projects that require big investments, pre-feasibility (business case) and feasibility studies are generally implementation to ascertain environmental,
undertaken
to verify
its viability
and to determine
the investment
and
requirements. These studies consist of various investigations and analyses if the project
is desirable
in terms
of the technical,
economic,
social,
financial and operational aspects.
5.1.2. Formulation of Plans and Investment Programs Projects that have been selected and prioritized - based on the outputs of the planning applications, or having passed the feasibility criteria - are considered candidates for inclusion in the medium-term
infrastructure
program and budget using the Multi-Year Programming
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual
Issue Date:
F
Doc. Code:
DPWH-QMSM
03
Revision No.:
20 of 37
Page No.
and Scheduling (MYPS) Application, where they are evaluated and ranked using the MultiCriteria Analysis (MCA) for roads and bridges. Flood control projects are evaluated using the flood control evaluation criteria. The selection and prioritization
of identified and evaluated projects are based on the requirements and
needs assessment of the ROs and DEOs, the master plan on the major river basins and principal rivers, and from the studies conducted by the Flood Control Management Division of the Unified Project Management Office (UPMO). For other infrastructure
projects, prioritization and selection are based on the convergence
programs of the Department with other agencies (e.g., tourism roads with Department of Tourism, school building projects with the Department of Education, and farm-to-market roads with the Department of Agriculture, among others). DPWH prepares the Annual Infrastructure
Program based on the Public Investment Program
(PIP) and available budgetary resources, which is submitted to the Department of Budget and Management (DBM). This is incorporated in the National Expenditure Program (NEP) and is submitted to Congress by the President for appropriation Appropriation
of funds under the General
Act (GAA) for the following budget year.
The DPWH Annual Infrastructure
Program contains
the projects
to be implemented
by PPP Service, the UPMOs (for foreign-assisted projects) and the ROs and DEOs (for locallyfunded projects), based on the approved levels of authority. These implementing offices are responsible for the conduct of detailed engineering as part of project planning prior to project implementation.
5.1.3.
Project Planning The QMS contains a documented procedure and provides a uniform process and template for the development preparations
of project specific plans. Planning activities
start
(such as engineering surveys together with soil investigation),
and social survey, and the preparation
of necessary documents:
with
project
environmental
Environmental
Impact
Assessment (EIS), Initial Environmental Examination (lEE), Social Impact Assessment (SIA), Resettlement Action Plan (RAP), Indigenous People Development Plan (IPDP) and Gender and Development (GAD) Plan. Project specific plans are based on the procedures in this QMS Manual, and can also include processes and documents which are specific to a project. Project specific plans contain the required verification, validation, monitoring, measurement, inspection and test activities specific to the project and the criteria for product acceptance.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual
Issue Date:
FES' 2 8 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
21 of 37
Page No.
Project specific plans also contain records showing evidence that the realization processes and resulting product meet requirements.
5.2
Customer Related Processes 5.2.1. Determination of Requirements Related to the Product The implementing office shall determine the necessary project requirements on customer needs and the technical, financial and environmental
based
aspects of the project.
These include delivery and post-delivery activity requirements as well as other statutory and regulatory requirements applicable to the project, including those not stated by the customers but necessary for its specified or intended use.
5.2.2. Review of Requirements Related to the Product Before the implementation
of a new project, the project requirements are assessed and
reviewed to determine the accuracy of data and to verify if there are inconsistencies that would lead to possible variations in design. Any changes in the requirements
are communicated
to the responsible personnel, and
documents are amended to reflect these changes.
5.2.3. Customer Communication DPWH has implemented
effective
relation
of contractual
to the delivery
arrangements
for communicating
obligations,
customer
with customers
enquiries
in
and customer
feedback, including customer complaints. The DPWH, through the Stakeholders Relations Service (SRS), monitors and responds to customers'
concerns through
the following
channels:
24/7 Call Center 165-02,
short
messaging system (SMS) TXT DPWH 2920, phone-in, letters (direct and referrals), DPWH website, DPWH Public Information Facebook and Twitter
accounts),
Division (PID) email account, social media (DPWH official the President's Facebook account, walk-in,
print and
broadcast media, and civil society organizations. The SRS assesses customer satisfaction through the analysis of feedback gathered from these mechanisms and channels.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date: Department of Public Works and Highways
•
5.3
Quality Management System Manual
Doc. Code:
DPWH-QMSM
Revision No.: Page No.
03 22 of 37
Surveys and Design Development
The DPWH, through the Bureau of Design (BOD) and its counterpart regional and district offices, conducts and reviews detailed engineering
surveys and investigations.
In order to come up with
the most functional, safe and cost-effective infrastructure design, it also monitors and implements the following design stages,: a.
Preliminary Design Development. In this stage, the initial requirements of design (e.g., design parameters and criteria), initial site survey (such as geological/geotechnical
investigation,
as
needed), detailed engineering survey, and right-of-way requirements are incorporated. The field
books, together with electronic files relative to the conduct of detailed engineering
surveys and investigations, are preserved. b. Design Development Stage. During this stage, the initial comments/recommendations preliminary incorporated
design schemes, final results of
engineering surveys and value engineering, are
into the final design schemes. These
comments and recommendations
on the
are reviewed and evaluated and the final
are provided, which are subsequently incorporated into the
Final Design Plan. Final Design Plan Development. At this stage, the Evaluation of the final design plan incorporates the comments/recommendations
on the design development and the monitoring of compliance.
Final Design Approval. This stage involves the Approval of the final design plans, Bill of Quantities, specifications and other contract documents for implementation. c.
Control of Design Change. This involves the verification of proposed changes in the approved design plans and the validation of their appropriateness to actual site condition. Any changes in the design plans are reviewed and concurred with, both for outsourced and in-house projects. Revised plans are issued for implementation
to concerned implementing
offices. All changes
made by the implementing office through site instructions are first validated and approved. For PPP Projects, the design and development is in accordance with the Concession Agreement.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
5.4
Issue Date:
FEB 2 8 2017
Doc. Code:
DPWH-QMSM
Revision No.:
03 23 of 37
Page No.
Production and Service Provision
5.4.1. Control of Production and Service Provision A project document contains procedures for operations control to ensure that all work is performed under planned and controlled conditions. Controlled conditions include, but are not limited to, the following: a. Construction
Documents
(approved
construction
plans and approved
contract
documents, among others); b. Documented workmanship standards where such standards were not defined in the c.
specification; Compliance with reference standards and documented procedures;
d.
Monitoring and control of operations as part of the supervision, inspection and/or audit
requirements; e. Carrying out of special processes under pre-qualified conditions or procedures, utilizing qualified/specialized
personnel;
f.
Pre-delivery services such as Final Inspection and Testing; and,
g.
Post-delivery activities such as warranty period and maintenance.
5.4.2. Validation of Processes for Production and Service Provision The Bureau of Research and Standards (BRS) and the Implementing
Offices concerned
(UPMO, ROs and DEOs) conduct tests on samples of construction materials prior to use in the projects. If the implementing offices do not have the capability to conduct such tests due to non-availability
of necessary equipment/apparatus
and/or chemical reagents, or due to
voluminous samples to be tested, the samples are brought to the BRS or to duly-accredited private testing laboratories, upon issuance of waiver by the concerned implementing offices. This is to ensure that only materials of the highest quality are used in the projects. The Bureau of Quality and Safety, its Regional and District counterparts and UPMO ensure the conformance
of the project to plans and specifications.
5.4.3. Identification and Traceability The Bureau of Construction (BOC), its Regional and District counterparts and UPMO maintain project
records to ensure adequate
infrastructure
identification
and traceability.
Information
on the
projects such as project description, project ID, start and completion dates,
duration, contract number, implementing
office, the contractor/s
name, contract amount,
and funding source are maintained in the database. The QMS ensures that
a procedure
to positively
indicate the conformance
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
or non-
Issue Date: Department of Public Works and Highways
•
Doc. Code:
Quality Management System Manual
DPWH-QMSM
Revision No.:
03
Page No.
24 of 37
conformance of a product and/or the process with regard to inspection and tests performed is in place.
5.4.4. Property Belonging to Customers or External Providers The DPWH exercises care for customer organization's
or supplier
property
while it is under the
control or being used by the organization. Upon receipt, such property is
identified, verified, protected and safeguarded. If such property is lost, damaged, or found unsuitable for use, this is reported to the customer or supplier, and corresponding records are maintained.
5.4.5. Preservation of Product (Infrastructure) The DPWH has a documented procedure on the detailed phases of acceptable construction practices - which includes the preservation of completed structures - that is made available to DPWH field engineers as guide. As soon as a project is completed, it is subjected to final inspection prior to the issuance of a certificate of completion. If no defects/deficiencies
are noted a year after completion, a
certificate of acceptance is issued. Upon acceptance, the project is automatically included in the DPWH maintenance activities of the Bureau of Maintenance (BOM) and its Regional and District counterparts. When an infrastructure
is beyond the scope of regular maintenance, rehabilitation activities
is undertaken by the concerned implementing office.
5.5
Control of Nonconforming Outputs DPWH's inspection and test procedure ensures that an output which does not conform to product requirements is identified and controlled to prevent its unintended use or delivery.
The Control of
Nonconforming Outputs procedure, DPWH-QMSP-04, defines the controls and related responsibilities and authorities for dealing with nonconforming outputs. When a nonconforming
output is corrected, DPWH subjects the output to re-verification to validate
its conformity to the requirements.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
Issue Date:
FEB 2 8 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
25 of 37
Page No.
Section 6. Support Processes 6.1
Procurement Management 6.1.1
General The Procurement Service and its counterpart procurement units in the Regional and District Offices act as Bids and Awards Committee (BAC) Secretariat and provide TWG services to the DPWH's BAC for Civil Works, Consultancy Services and Goods. These offices assist the BAC of all DPWH offices by providing advice and recommendations
based on the existing
laws and regulations and procurement guidelines of funding institutions. Preparing for procurement is an important phase, which basically involves three activities: a.
Procurement Planning where the procuring entity and its BAC schedule in advance its procurement activities for the year through the Project Procurement Management Plan (PPMP), which is consolidated into the Annual Procurement Plan (APP);
b. Preparation of Bidding Documents where the procuring entity ensures that all the information provided to the bidders are accurate and comprehensively reflect the main c.
activities of the PPMP, and; Conduct of Pre-Procurement
Conference
where
all the
officials
involved
in the
procurement meet and discuss all aspects of the transaction. For the procurement of Consultancy Services, in conformity with the schedule provided in the
existing
Rules and Regulations
and Procurement
Guidelines
of foreign
lending
institutions, the following activities are undertaken: a. Advertisement b. Receipt of Applications for Eligibility and Shortlisting and conduct of Eligibility Check c. Shortlisting d. Issuance of Request for Proposals (RFP)jBid Documents (BDs) e. Conduct of Pre-Bid Conference f.
Submission and Receipt of Bids
g.
Bid Evaluation
h. Negotiation i.
Post-Qualification
j.
Issuance of Notice of Award.
To measure the performance of consultants in their completed projects, the Consultant's
Performance Evaluation System (ConsPES) is applied. The results derived from the ConsPES is considered as input for shortlisting and bid evaluation.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date: Department of Public Works and Highways
•
FEB 2
03
Revision No.:
26 of 37
Page No.
As to the procurement of Infrastructure
2017
DPWH-QMSM
Doc. Code:
Quality Management System Manual
B
Projects, and Goods and Services, the following
activities - which also follow the existing Rules and Regulations and Procurement Guidelines of foreign lending institutions - are undertaken: a. Advertisement b. Pre-Bid Conference c.
Submission and Receipt of Bids
d.
Eligibility Check
e.
Bid Evaluation
f.
Post-Qualification
g. Award of Contract The Specialized Offices ensure that the goods delivered
are in accordance with the
specifications.
6.2
Human ResourcesManagement 6.2.1
General The Human Resources and Administrative
Service (HRAS) and its Regional and District
counterparts ensure that applicants who get hired and employees who are promoted have the required credentials and qualifications for their respective positions, prescribed under the Qualification Standards (QS) Manual of the Civil Service Commission (CSC) as well as the Preferred Qualification Standards set by the office where the vacancy exists. The QMS contains procedure for the training of employees in the tasks they are expected to perform. Training needs are assessed annually and are documented. The HRAS formulates and implements policies, guidelines, systems, methodologies, programs and projects
on human
resource development,
which
included
capacity-building
and
empowerment. These are carried out thru: a. Competency Gap Determination
and Evaluation thru Training Needs Assessment and
Impact Evaluation b. Capacity Building and Empowerment thru Course Administration/Facilitation c. d.
Development of Course Design Management of Training Equipment,
Facilities
and of
Materials
Development e. Coordination of External Learning and Development
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
and
Multimedia
Issue Date: Department of Public Works and Highways
• 6.2.2
Doc. Code:
Quality Management System Manual
FFS
2 B 2017
DPWH-QMSM
Revision No.:
03 27 of 37
Page No.
Competence, Training, and Awareness To ensure that employees have the competencies required by their function, the HRAS and its Regional and District counterparts carry out the following: a.
Determine the necessary skills and aptitudes of employees performing work that affects
conformity to product requirements; b. Provide training or take other actions so that the necessary competence is acquired; c. d.
Evaluate the effectiveness of actions taken; Ensure that employees are aware of the relevance and importance of their role and how they contribute to the achievement of the quality objectives; and,
e.
6.3
Maintain records of employees' education, training, skills, and experience.
Financial Management The Finance Service (FS) and its Regional and District counterparts manage and administer all finance-related matters of the Department through the following: a.
Ensure that all financial transactions and operations are being recorded in accordance with generally accepted accounting principles and pertinent laws, rules and regulations.
b. Control allotments by maintaining a Registry of Allotments and Obligations to ensure that all monies appropriated for function, activities, projects and programs shall be available solely for the specific purposes for which these were appropriated. c.
Control the Notice of Cash Allocations (NCA) to ensure that disbursements
do not exceed
the NCA released based on approved Cash Program. d.
Ensure that all disbursements
are supported with complete documents
and that government
resources are being safeguarded through the practice of sound financial management. e.
Keep and maintain basic financial records and books of accounts - through the e-Budget and eNGAS - that reflect the propriety of transactions and evidence of accountability for assets and other resources available for use.
f.
Prepare and submit financial reports containing information
on past operations and present
conditions as basis for planning and budget preparation.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
6.4
Quality Management System Manual
Issue Date:
FEB 2 B 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
28 of 37
Page No.
Physical Resource Management
6.4.1
Facilities and Work Environment Management The DPWH ensures that a suitable environment for the operation of its processes and the achievement
of conformity
of products
and services are determined,
provided,
and
maintained. For this purpose, a quality workplace standards is implemented to ensure a clean, organized and well-maintained workplace to promote quality and productivity. Human factors are considered to the extent that they directly impact the quality of products and services. The HRAS and its Regional and District counterparts manage and ensure the maintenance of buildings and facilities. All offices designate Building Administrators to monitor the safety of all DPWH structures, electrical circuitry and lighting systems, cleanliness of the premises and its surroundings, recommendations
and that all pathways are free from obstruction. They also submit
to management
on DPWH buildings and/or facilities that need repair,
rehabilitation or improvement.
6.4.2
Equipment Fleet Management The Bureau of Equipment and its Regional and District counterparts
ensure the safe,
environmental compliance, availability and optimum utilization of the fleet of land and waterbased equipment of the Department. The BOE and its Regional and District counterparts ensure that the equipment life cycle stages are in accordance with the current standards and policies. The matrix on the next page shows the levels and areas of responsibilities for the equipment resources life cycle:
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
Issue Date:
J:J:R 2 B 2017
Doc. Code:
DPWH-QMSM
Revision No.:
03 29 of 37
Page No.
Equipment Equipment
Planning
Portfolio
Demand
and Procurement!
Management Dredger
Life Cycle Stage
Distribution
Operations
and
and
Deployment2
Maintenance
and
Ancillary
BOE,
BOE
BOE
BOE
BOE,RO
BOE
BOE,RO
UPMO,
RO
Equipment
Rehabilitation
DisposaP
BOE,RO
BOE,RO
Road Maintenance and
BOE,
UPMO,
RO,DEO
Construction
BOE, RO,
BOE,RO
DEO
Equipment Central Service
BOE,RO,DEO
BOE,RO
Vehicle
Office, UPMO,
BOE,RO
BOE,
RO,
BOE, RO,
BOE,RO
DEO
DEO Shop
Tools BOE,RO,DEO
BOE,RO
and Equipment
BOE,
RO,
BOE, DEO
DEO
RO,
BOE, RO,
BOE,RO
DEO
Notes: 1.
Regional Offices (ROs) and District Engineering
Offices (DEOs) may be allowed to procure
Service Vehicles provided that these offices can secure Authority
Equipment
and
to Purchase from the DPWH Secretary thru
the Bureau of Equipment. 2.
The Regional Directors
are authorized
to distribute
and deploy both land and water-based
equipment
and
service vehicles within their areas of jurisdiction. 3.
In the Disposal Process, ROs and DEOs initiate the Disposal Procedure of Equipment
and Service Vehicles.
The Regional Offices, thru the Regional Disposal Committee,
and Service Vehicles
can dispose Equipment
holdings in their regions within their level of authority.
6.4.3
Survey, Laboratory and Field Testing Equipment Management The matrix below shows the office responsible for the management and maintenance of Survey, Laboratory and Field Testing Equipment, which support the Department's Processes:
Equipment/Resource Portfolio Laboratory Equipment Field Testing Equipment
Responsible Office/ s BRS and its Regional and District counterparts BRS and BQS, and their Regional and District cou nterpa rts
Engineering Survey
UPMO - Flood Management Cluster and BOD and
Equipment
its Regional and District counterparts
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Core
Department of Public Works and Highways
•
6.5
Quality Management System Manual
Issue Date:
017
Doc. Code:
DPWH-QMSM
Revision No.:
03
Page No.
30 of 37
Information Management
The Information
Management Service (IMS) ensures appropriate investment in Information
Communications Technology (lCT) infrastructure
and
and skills to effectively manage the DPWH wide
area network (WAN) and servers, and to be able to provide application and software support services. This is done through
Information
Management
planning whereby
strategic
assessments are
conducted to identify future IT-enabled needs and Business Process Improvements (BPls), based on the Department's
Strategic Plan. The BPls are presented to the Reform Institutionalization
and
Management Support System (RIMSS) Steering Committee for approval and prioritization, as well as funding sources. These are carried out and translated into the Information
Systems Strategic Plan
(lSSP) of the Department. The ISSP is the basis of ICT activities in the Department. The ICD Steering Committee holds regular meetings for activity status reporting, monitoring and evaluation of performance improvement targets. The IMS also maintains process and data models, as well as data architecture. It monitors compliance with data policies, procedures, operating standards and guidelines. As to hardware maintenance, the IMS and its Regional and District counterparts conduct daily, weekly, monthly or annual maintenance tasks for all production Department.
servers that run the enterprise-wide
application
systems used by the
It also conducts regular and preventive maintenance activities for all voice and data
communication equipment and desktop computers. For application systems, a regular quarterly review and enhancement activity is being done on top of the application maintenance for the immediate resolution of critical problems that impede the operation of systems, as reported to the IT Service Desk.
6.6
LegalServices The Legal Service (LS) prepares, reviews, evaluates and interprets Agreement
(MOA),
Memorandum
of Understanding
contract,
Memorandum
(MOU), legal proposals and other
of
legal
instruments entered into by the Department. LS also conducts administrative investigation and reviews administrative charges. It is in charge with the issuance of resolution of administrative cases brought before it, and legal clearances of concerned officers and employees of the Department. It also undertakes the acquisition of site and location as right-of-way
for national infrastructure
projects.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date: Department of Public Works and Highways
Quality Management System Manual
•
6.7
Doc. Code:
FEB
2 8 2017
DPWH-QMSM
Revision No.: Page No.
03 31 of 37
Documentation Management
The DPWH's QMS documentation
includes both documents and records. The DPWH documentation
may be in hardcopy or electronic form and is described in the figure below.
Level 2
Level 3 Figure 6.1 DPWH Documentation Management Level 1 The quality manual is the highest level of documentation.
It describes DPWH's quality
management system.
Level 2 This level of documentation
includes prescriptive documents such as Department
policies and procedures, manuals, specifications, externally-sourced
Orders,
documents, and the like.
Level 3 This level includes descriptive documents providing evidence of conformity and are referred to as records.
The organization "document"
does not use the term "documented
information";
instead it uses the terms
and "record" which undergo different controls as indicated herein.
Documents refer to documented information to be maintained, while Records refer to documented information to be retained.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
7
~sueD~e: Department of Public Works and Highways
• 6.7.1
Doc. Code:
Quality Management System Manual
Revision No.: Page No.
DPWH-QMSM 03 32 of 37
Document and Data Control 6.7.1.1
General a. The Quality Management System contains documented
procedure to control
all essential documents and data affecting the processes within the scope of the QMS. b. Controlled Documents include, but are not limited to, Department Order, Special Order, Department
Memorandum Circular, Unnumbered Memorandum,
Plans,
Specifications and Drawings, Quality Management System Manual, Procedures and Forms.
6.7.1.2
Document Approval and Issuance a. In accordance with Department Order No. 33 series of 2011, Policy Issuance Guidelines, Department Orders shall address changes in internal procedures in reference to laws, Executive Orders, Administrative
Orders, and/or to update
existing Department Orders. DOs for department-wide implementation shall be subjected to comprehensive review and impact analysis prior to issuance. b. The Records Management
Division (RMD) of the
Administrative
Service (HRAS) shall be responsible for the filing of hardcopy,
dissemination
and posting in the DPWH intranet and internet websites, of
issuances for Department-wide c.
Human Resources and
implementation;
Heads of Services, Bureaus, UPMOs, Regional and District Offices shall be responsible for the distribution/dissemination
of issuances to their respective
units. d. Issuance of Office Orders, procedures, guidelines and other documents be used internally Documents
by an office shall be in accordance
to
with the Control of
Procedure.
e. The designated
Records Officers shall be responsible for the control and
distribution of internally generated documents.
6.7.1.3
Document and Data Changes The
QMS contains
a documented
Control
of Document procedure, DPWH -
QMSP-Ol, to ensure that procedures are identified,
prepared, documented
and
revised in a uniform manner in order to give users clear guidance and direction on how to use it. BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date: Department of Public Works and Highways
Quality Management System Manual
•
FFR
2 8 2017
DPWH-QMSM
Doc. Code:
03
Revision No.:
33 of 37
Page No.
6.7.2 RecordsControl a. The QMS contains a documented Control of Records procedure, DPWH-QMSP-02, for the identification, collection, indexing, filing, access, storage, maintenance and disposition of all records. b. Records are maintained to demonstrate conformance to specified requirements and for the effective operation of each facet of the QMS. c. All incoming mails and records are attended to and processed in accordance with the provisions of R.A. 9485 or the Anti-Red Tape Act. d.
Records are classified according to the approved file classification
scheme (DPWH
Classification Guide) and are stored, filed, secured and properly labeled to guarantee fast retrieval when needed, as well as to protect records from damage, loss and deterioration pursuant to D.O. No. 148 series of 1992 on Records Management Manual. Any record printed on thermal paper must be photocopied before filing. e. The disposition of records is in accordance with the latest Records Disposition Schedule (RDS) of the Department as approved by the National Archives of the Philippines (NAP). f.
6.8
Records can also be stored in electronic form.
Organizational Knowledge The DPWH determines the knowledge necessary for the operation of its processes and to achieve conformity of products and services. This knowledge, used to achieve the organization's objective, may be obtained from: a. Internal sources, such as lessons learned from success and failures, feedback from subject matter experts, intellectual property, knowledge gained from experience, research; and, b. External sources such as standards, academia, conferences, or information
gathered from
customers or suppliers. This knowledge is maintained and made available to the extent necessary. When addressing changing needs and trends, the DPWH considers its current knowledge and determines how to acquire or access the additional knowledge necessary.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Section 7. 7.1
Quality Management System Manual
Issue Date:
FEB 2 B 2017
Doc. Code:
DPWH-QMSM 03
Revision No.:
34 of 37
Page No.
Performance Evaluation
General The DPWH plans and implements
the monitoring,
measurement,
analysis, and improvement
processes needed to: a. demonstrate conformity to product requirements, b. ensure conformity to the quality management system, and c.
7.2
continue the effectiveness of the quality management system.
Monitoring and Measurement 7.2.1 General The
DPWH
requirements
has
established
benchmarks
for
performance,
based
on
and industry standards, and has a process for monitoring
stakeholders
and measuring
performance and analysis of data. There is a documented process for the conduct of audits, including selection criteria for the determination audits,
of the subject of the audit. Data gathered
performance
reviews of processes,
contractors,
from stakeholders feedback,
consultants,
and suppliers are
analyzed, documented and acted upon - as warranted - and reported to the management and to the stakeholder, where appropriate.
7.2.2 Stakeholder Satisfaction The DPWH, through
the Stakeholders Relations Service (SRS), monitors and documents
information provided by both internal and external stakeholders through results of customer satisfaction surveys carried out by in-house and/or independent
survey organizations, to
determine
requirements.
whether
its products
and services meet customer
Gathered
information is analyzed quantitatively and qualitatively, and reported to the management.
7.2.3 Internal Audit Internal audit is the conduct of management and operations audit and the determination of the degree of conformance to ISO 9001:2015 standards, and compliance regulations,
managerial
policies,
and
with
laws,
contractual obligations. It includes the appraisal
of the plan of the organization and all the coordinate methods and measures, the results of which are used to recommend courses of action on matters relating to management control and operations audit. Internal audit, being a separate component of internal control, is instituted to determine BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date: Department of Public Works and Highways
•
Doc. Code:
Quality Management System Manual
DPWH-QMSM
Revision No.:
03
Page No.
35 of 37
whether other internal controls are well designed and properly operated. The QMS contains a documented planning
and implementing
Internal
internal
Quality Audit procedure,
quality
DPWH-QMS-03, for
audits. Audits are performed
regularly
in
accordance with a defined program, taking into account the importance and status of the processes and risks considerations. Audits are conducted on both procedures and systems to enable scrutiny of the interaction between procedures. The head who is responsible for the area being audited ensures that any necessary corrections and corrective actions are undertaken without
undue delay to
eliminate detected nonconformities and their causes. Results of audits are maintained and compliance is regularly monitored.
7.2.4
Monitoring and Measurement of Processes The DPWH applies suitable methods for monitoring and, where applicable, measurement of the QMS processes. DPWH uses the Project Monitoring System (PMS) / Project Contract Management Application (PCMA) and the respective office scorecards in tracking the progress of planned targets. DPWH also uses its internal audit procedure to monitor the QMS processes. Through this strategy, DPWH is able to gauge the effectiveness of the processes to achieve planned results. When planned
results are not attained,
corrective actions are taken to ensure
conformity.
7.2.5
Monitoring and Measurement of Product The DPWH regularly conducts inspection, assessment, monitoring and field/laboratory
tests
to verify conformance to specification requirements of construction materials, or of the very structure on which these were used or had been incorporated into. Sampling and testing of materials are done at various stages of construction. dimensions
are measured to verify conformance
For completed works and structures, to the approved
construction
plans.
Likewise, if warranted by circumstance or necessity, destructive or non-destructive tests can be done to determine
structural
integrity
and adequacy vis-a-vis the specified design
DPWH collects and analyzes data to demonstrate
the suitability and effectiveness of the QMS,
strength.
7.3
Analysis of Data
and to evaluate where continual improvement on the effectiveness of the QMS may be applied.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
Issue Date:
FEB 2 8 2017
Doc. Code:
DPWH-QMSM
Revision No.: Page No.
03 36 of 37
Data analysis is contrasted with the Scorecard to determine changes in performance.
Trend analysis is an important aspect of the data analysis process as it provides significant evidence of the effectiveness of the system.
7.4
Management Review 7.4.1 General The DPWH management reviews the QMS at least once a year to ensure its continuing suitability,
adequacy
improvement,
and effectiveness.
The review includes assessing opportunities
for
the need for changes to the QMS, and the quality policy and quality objectives.
This is carried out in one of the Management Committee and/or staff meetings. A Management
Review procedure,
DPWH-QMSP-07 is established to ensure the proper
conduct and recording of the review process.
7.4.2 Review Input The input to management review may include any or all of the following: a.
project status reports
b. results of audit since last Management Review c.
status of corrective actions
d. customer feedback e. status of objectives and targets f.
follow up actions from last management review
g. changes that could affect the QMS h. opportunity for improvement i. changes in external and internal issues that are relevant to the QMS j.
performance of external providers
k. adequacy of resources I. effectiveness of actions taken to address risks and opportunities
7.4.3 Review Output The outputs from management review include decisions and actions related to any need for changes to the QMS and its processes, improvement of operations/services customer requirements, and resource needs.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
related to
Issue Date: Department of Public Works and Highways
•
Section 8. 8.1
Doc. Code:
Quality Management System Manual
Revision No.: Page No.
DPWH-QMSM 03 37 of 37
Improvement
General The DPWH determines and selects opportunities for improvement and implements any necessary actions to meet customer requirements and enhance customer satisfaction.
These include:
a. improving products and services to meet requirements as well as to address future needs and expectations; b. correcting, preventing or reducing undesired effects; and, c.
8.2
improving the performance of the QMS.
Nonconformityand CorrectiveAction The QMS contains a documented Corrective Action procedure, DPWH-QMSP-OS,to ensure that nonconformities
in performance and product are corrected. The procedure also provides a system
for determining the causejs of nonconformities and implementing appropriate corrective actions to ensure that nonconformities will not recur, or occur elsewhere.
Prepared by:
B~E~Ut
. ASIS Und
Assistant Secretary for Support Services Deputy Quality Management Representative
Ov
retary for Technical Services
all Quality Management Representative
BE CERTAiN THAT THIS is THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
1.0
~EB 2 8 2017
Doc. Code:
DPWH-QMSP-Ol
03
Revision No.:
Control of Documents Procedure
1 of 4
Page No.
Purpose
To provide a guide for an effective implementation
2.0
Issue Date:
method of controlling
internal documents
used in the
of DPWH's Quality Management System (QMS).
Definition of Terms Internal Documents refer to documents generated within the confines of DPWH such as Quality Management
System Manual, Department
Orders, Special Orders, Department
Circulars, National Building Code Development
Office (NBCDO) Memorandum
Memorandum
Circulars, Office
Orders, and unnumbered Memoranda.
External Documents refer to documents used in the implementation
of DPWH's QMS which
originate from outside the agency. These may include customer specifications, technical manuals, regulations, and other information used as references. These are disseminated through Department Memorandum Circulars.
Records Office refers to the office that handles the filing and safekeeping of the master copies of documents. The Records Officer (RO) is the custodian of documents. master copies of department-wide
documents.
The Central RO keeps the
Bureaus, Services, UPMO, Regional, and District
Offices shall designate their respective RO to keep master copies of documents originating from their respective offices.
Master Copy refers to the original document that has to be always controlled. These are filed at the Records Office and should not be taken out from there. Writing on and/or any form of erasure and/or unauthorized changes on these copies are strictly forbidden.
Controlled Copy refers to the copy of documents issued to all Heads of DPWH offices and published in the DPWH website. This also includes Office Orders issued to specific recipients in a given bureau/service/office.
In cases of revisions, the RO need to furnish a revised copy of the
document for updating.
Uncontrolled Copy refers to the printed copy of documents that are published in the DPWH website and are disseminated for information and/or reference purposes only. In cases of revisions, the RO need not furnish a revised copy of the document for updating.
Obsolete Copy refers to the copy of documents that have become outdated due to revisions. Although
no longer valid for use, the master copy of obsolete documents should be kept in
accordance with the prescribed retention period in the Records Disposition Schedule (RDS).
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
3.0
Control of Documents Procedure
Issue Date: DPWH-QMSP-Ol
Doc. Code:
03
Revision No.:
2 of 4
Page No.
Procedure
Process Flow
Determine the need to create/revise internal documents
Responsible
Details
Concerned Office
Create or revise internal document based on the need of a concerned office, unit or customer;
or as a
result of audit, the concerned office shall. Concerned Records Create/revise the document
Officer
Every five (5) years, the Records Officer reminder
(RO)
shall
prepare
memorandum
for
a all
offices to review existing documents in order to determine adequacy and suitability.
The Memorandum shall
be signed by the Overall QMR. For Department Orders and Special Orders, refer to Department Order No. 33 Series of 2011 - Policy Issuance Guidelines.
Approve document
Head of Concerned Office
The head of office shall discuss the contents
of the
document
in a
meeting with concerned personnel before signing. When amending a document, attach all documents to be superseded.
Ensure proper management of document
Concerned Records
Approved
Officer
forwarded Records
documents to Officer
management.
(
shall
the
End) BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
be
designated for
proper
Department of Public Works and Highways
Qual ity Management System Manual
•
Control of Documents Procedure
Issue Date: Doc. Code:
FEB DPWH-QMSP-Ol
03
Revision No.:
3 of 4
Page No.
The Records Officer shall: a. Log the document in the Masterlist. b. Assign document code for DPWH QMS manual, procedures and related forms, as follows: Manual and Procedures:
DPWH-XXXX-L Series Number Type of Document* Name of Organization * QMSM - QMS Manual QMSP - QMS Procedure
Forms:
Revision Number Series Number Document Code For other documents, the Records Officer of the concerned office shall be responsible in ensuring that all issued documents are current. Reproduce the document.
Refer to the DPWH Classification Guide when assigning codes.
For documents to be implemented department-wide:
scan the controlled hard copy and post in
the DPWH internet and intra net websites; for standardized forms: coordinate with the IMS to make it downloadable from the DPWH websites. Distribute copies of document to concerned offices through electronic-mail
blast facility of the
IMS. Controlled hard copies distributed to concerned offices shall bear the classification code. Documents intended for internal use shall be disseminated through a memorandum (for specific personnel/unit);
or through office order (for office-wide implementation)
signed by the head of
office. Documents posted in the intranet and internet websites of the Department
are considered
controlled copies, while printed copies from the websites are considered uncontrolled copies and BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date:
Department of Public Works and Highways
Doc. Code:
Quality Management System Manual
•
Revision No.:
Control of Documents Procedure
03 4 of 4
Page No.
valid only on the date the document was printed. Documents published in the websites are backed-up daily by the IMS and back-up copies are stored onsite and off-site. Superseded documents are removed from the document Masterlist, stamped "Obsolete", filed separately, and retained in accordance with the Control of Records Procedure, DPWH-QMSP-02. Superseded
documents
in the
DPWH websites
shall have the
remarks "Superseded
by
" Other copies of obsolete documents shall be disposed based on the National Archives of the Philippines Guidelines. For external documents, refer to Department Order No. 126 Series of 2015.
4.0
References DPWH Quality Management System Manual, DPWH-QMSM PNS ISO 9001:2015 Standards Control of Records Procedure, DPWH-QMSP-02 Department Order No. 33 Series of 2011 Department Order No. 77 Series of 2014 Department Order No. 126 Series of 2015 Records Disposition Schedule National Archives of the Philippines Guidelines DPWH Classification Guide
5.0
Records Policy Impact Analysis Document MasterlistjLogbook Administrative
Issuance Form
Reviewed by:
Prepared by:
~ GO.:n~~ ~.~
B.·~~TV'P Assistant Secretary for Su Deputy Quali
Mana
rt Services
ent Representative
. ASIS Undersecr
for Technical Services
Ity Management Representative
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
1.0
DPWH-QMSP-02
Doc. Code:
Quality Management System Manual Control of Records Procedure
•
FEB 2 B 2017
Issue Date:
Department of Public Works and Highways
02
Revision No.:
1 of 4
Page No.
Purpose
To define a system for maintaining
DPWH's Quality Management
System (QMS) through
complete and reliable records control.
2.0
Definition of Terms Record refers to a document stating results achieved or providing evidence of activities performed.
Retention Period refers to the length of time a record is kept in a particular location as defined in the Department Memorandum Circular No. 47 Series of 2012.
Records Disposition Schedule (RDS) refers to a document that contains the list of records and indicates,
as applic-able, the record's identification
such as document
code and title,
location, retention period, and disposition schedule.
3.0
Procedure Process Flow
Responsible
Details
Concerned Personnel
Identify the record. It can be in any form or type of media (electronic, hardcopy, etc.) and are identified through any or combination of the following:
Identify the record
• Title • Date • Name and/or Signature of the originator and/or approving person • Code • Control Number
Maintain the Records Disposition Schedule (RDS)
Records Officer
Records Disposition Schedule (RDS) Maintain
a
that provides the list of records and
indicates,
as applicable,
the record's identification as
code
and
retention
title, period,
disposition schedule.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
such
location, and
Issue Date:
Department of Public Works and Highways
•
Quality Management System Manual
Control of Records Procedure Process Flow
EB 2 B 2017
Doc. Code: Revision No.: Page No.
DPWH-QMSP-02
02 2 of 4
Details
Responsible
Refer to current RDS, as required by the National Archives of the Philippines (NAP), to determine if there is an existing file or record, and to update the list for additional records. Concerned Personnel File in corresponding location
supplemental QMS RDS Form, DPWH-QMSP-02-F01,
A
is used for new records especially generated from the established QMS. Generally, records are with the Records Officer - although some records are maintained by the process owners themselves. Provide a numbering system to all filing cabinets and cabinet shelves. Proper labeling is likewise established for boxfiles, folders, envelopes, etc. to easily locate needed records. Records can be alphabetically, chronologically. Concerned Personnel
Protect records
numerically, or
Records are kept in a place where it can be protected from physical deterioration, damage, loss, and data tampering. To prevent unauthorized amendments on the recorded data, the following are observed: • Liquid eraser, etc. for correcting data is prohibited . • Only permanent blue or black ink pens are used to fill out forms.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date:
Department of Public Works and Highways
•
Quality Management System Manual
Control of Records Procedure Process Flow
Responsible
Doc. Code: Revision No.: Page No.
DPWH-QMSP-02
02 3 of 4
Details • All corrections are countersigned by the issuer and/or authorized personnel. Electronic records are backedup regularly.
Concerned Personnel
Records are retained for a period specified in the Records Disposition Schedule (RDS). Retention is in accordance with the provision of the National Archives of the Philippines (NAP) and other applicable statutory and regulatory requirements.
Concerned Personnel
Disposition of records is in accordance with the provision of NAP and other applicable statutory and regulatory requirements.
Retain record
Dispose records
Disposed records are properly documented with appropriate proof, e.g., Certificate of Disposal issued by NAP.
4.0
References DPWH Quality Management System Manual, DPWH-QMSM PNS ISO 9001:2015 Standards National Archives of the Philippines (NAP) Rules and Guidelines Department Memorandum Circular No. 47 Series of 2012
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual Control of Records Procedure
• 5.0
Issue Date: Doc. Code:
FEB 2 8 2017 DPWH-QMSP-02
Revision No.: Page No.
02 4 of 4
Records NAP Records Disposition Schedule (RDS) NAP Certificate of Disposal Records Disposition Schedule (RDS)
Reviewed by:
Prepared by:
.. tl ~~ o
D
M.
Chief Rec rds
ONE
anagement Division, HRAS
t~H~
Assistant Secretary for Support Services Deputy Quality Management Representative
Approved by:
r Technical Services Management Representative
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
•
Department
DPWH-QMSP-02
of Public Works and Highways QMS Records Disposition
-F01-Rev .03
Schedule (RDS)
Supplemental to the NAP RDS Records Officer:
Office:
Code (as applicable)
Inactive
Active Record Title and Description
No. of Years
No. of
Location
Years
Reviewed and Approved by:
Prepared by:
Office Head
Records Officer
Page 1 of 1
Location
Mode of Disposal
Department of Public Works and Highways
Quality Management System Manual
•
1.0
Internal Quality Audit Procedure
Issue Date:
FEB 2 8 2017
Doc. Code:
DPWH-QMSP-03
Revision No.:
03 1 of 5
Page No.
Purpose
To define a system for planning and executing internal quality audit and follow-up audit activities, reporting results and monitoring the actions taken, and to ensure that the Quality Management System (QMS) is effectively implemented and maintained.
2.0
Definition of Terms Audit refers to the systematic, independent and documented process of obtaining evidence and evaluating to objectively determine the extent to which requirements are fulfilled.
Auditee refers to the person being audited. Auditor refers to the person who has the competency to conduct the audit. Nonconformity (NC) refers to non-fulfilment of a requirement. Correction refers to action taken to eliminate the detected nonconformity. Corrective Action refers to action taken to eliminate the cause/s of the detected nonconformity, thus preventing its recurrence.
3.0
Procedure Process Flow
(
Start
Responsible
Details
)
Prepare the audit program
Internal Quality Audit Committee Leader
Prepare the internal quality program, DPWH-QMSP-03-F01, into consideration the frequency, methodologies, results of previous audits.
audit
taking audit scope, as well as the
Form the audit teams and assign team leaders. Auditors are selected from the pool of qualified auditors. Auditors are qualified on the basis of their education and knowledge on internal control systems, internal auditing experience, and basic computer operations skills. Auditors must have attended the seminar/training on auditing ISO 9001:2015 Quality Management System. Ensure that audits are performed by personnel independent from the areas being audited. Internal Quality Audit is conducted at least once a year.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual
Internal Quality Audit Procedure
Process Flow
Prepare the audit plan
Responsible
IQA Committee Leader Audit Team
Issue Date: Doc. Code:
FEB 2
2017
DPWH-QMSP-03
03
Revision No.: Page No.
B
2 of 5
Details
For each scheduled
audit,
prepare
an
Internal Quality Audit Plan, DPWHQMSP-03-F02, containing the specific criteria for the processes and the actual date of the conduct of audit. It also takes into consideration the status and importance of the areas to be audited, as well as, the results of previous audits.
Audit Team Leader
Prepare an audit notification memo with the
Internal Quality Audit Itinerary, DPWH-QMSP-03-F03, for each
Notify the auditee
officejarea that includes purpose, audit scope, areas or divisions to be audited, assigned auditors, date and time of. audit. This must be received by the auditee at least one week before the audit.
Conduct Pre-Audit Activities
Conduct Audit Proper Activities
Prepare Audit Finding
IQA Committee Leaderj Audit Team Leaderj Auditors
Prepare audit checklists, review documents and records of previous audits. Use Audit
Checklist Form, DPWH-QMSP-03-F04.
IQA Team
Conduct audit and include follow-up on the previously agreed action plans and the effectiveness of implementation.
Auditors
Determine the strong and weak points of the system by reviewing previous results.
BE CERTAIN THATTHIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Issue Date:
Department of Public Works and Highways
•
Quality Management System Manual
Internal Quality Audit Procedure
Process Flow
Prepare Summary of Findings
Doc. Code: Revision No.: Page No.
DPWH-QMSP-03
03 3 of 5
Responsible
Details
Auditors
The findings are summarized to show conformities, opportunity for improvement and nonconformities. Use IQA Summary
Report
Form, DPWH-QMSP-03-FOS.
The findings are discussed to the auditee. Accomplish the first part of CPAR Form, DPWH-QMSP-OS-FOl for nonconformities. Once approved by the IQA Committee Chairman, the IQA Summary and CPAR is issued to the auditee.
Auditors/ Auditees
Gather data and, where needed, use appropriate approaches and techniques, e.g. brainstorming, cause and effect analysis, and the like.
Process Owner
Action planning is done by Process Owner's Group and -where necessary- all the affected areas, to arrive at possible solutions.
Process Owner
The concerned process owner will accomplish the second part of the CPAR Form.
Auditors/Audit Team Leader
The auditee returns the CAR Form within ten days from receipt, for monitoring of action plans. The auditors may condct follow-up audit to check if action plans are being implemented and are effective.
IQA Committee Chairman Management Process Owners
IQA Committee Chairman reports to Management the results of audit including results of follow-up activities.
Investigate cause of nonconformity
Prepare Corrective Action Plan
Implement Action Plans
Follow-up Action Plans
Review Audit Results
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual Internal Quality Audit Procedure
FEB 2 B 2017
Doc. Code:
DPWH-QMSP-03
03
Revision No.:
4 of 5
Page No.
Responsible
Details
Process Owners
Determine areas for improvement that needs to be elevated to management for review, if there is any.
Management
Management reviews the results of audit to identify the processes, services, product, or system that need improvement, as reflected in the Management Review
Process Flow
Determine areas for improvements
Issue Date:
Identify improvements on processes/services
Procedure, DPWH-QMSP-07.
Monito measure improvements
Process Owners
If the action plan is effective, existing documents may be revised or new document may be created following the
Control of Document DPWH-QMSP-Ol.
4.0
References DPWH-QMS-Manual, Quality Manual PNS ISO 9001:2015 Standards DPWH-QMSP-07, Management Review Procedure DPWH-QMSP-01, Control of Documents Procedure
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Procedure,
Department of Public Works and Highways
•
5.0
Quality Management System Manual
Internal Quality Audit Procedure
Issue Date: Doc. Code: Revision No.: Page No.
Records DPWH-QMS-03-F01, Audit Program DPWH-QMS-03-F02, Audit Plan
DPWH-QMS-03-F03, Audit Itinerary DPWH-QMS-03-F04, Audit Checklist DPWH-QMS-03-FOS, Audit Summary Report DPWH-QMS-OS-F01, Corrective Action Request (CAR) Audit Notification/Memorandum
Reviewed by:
Prepared by:
GLIRICI
Approved by:
RAU
. ASIS for Technical Services
Overall Quality Management Representative
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
FEB 2 8 2017 DPWH-QMSP-03
03 S of S
DPWH-QMSP-03-F01-Rev.03
Department of Public Works and Highways
INTERNAL QUALITY AUDIT PROGRAM FOR CY
I.
_
Objective 1. To determine conformance to the DPWH requirements for its quality management system; 2. To provide information whether the quality management system is effectively implemented and maintained; 3. To verify compliance, adherence to quality policy and achievement of objectives and targets; and 4. To determine areas for improvement on all processes.
II. Scope and frequency of audit All the processes described in the DPWH QMS Manual being performed by the Bureaus, Services, Regional Offices, District Engineering Offices and Unified Project Management Offices, shall be audited at planned interval i.e., at least once a year.
III. Audit Schedule Area
Process/ es
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17 IV. Audit Criteria
V.
Audit Methodology
Page 1 of 2
Audit Schedule
.~~
~ ••
DPWH-QMSP-03-F01-Rev.03
Department of Public Works and Highways
VI. Selection and Evaluation of Auditors
VII. Reporting
VIII.
Verification of Previous Nonconformities(NC)/Foliow
Up Actions
IX. In order to advocate independence as an audit principle, cross posting of auditors will be implemented.
In no case will any auditor be assigned to audit his/her own work or division.
Reviewed by:
Prepared by:
Internal Quality Audit Chairman
Internal Quality Audit Leader
Approved by:
Undersecretary for Technical Services Overall Quality Management Representative (QMR)
Page 2 of 2
•
Deparbnent of Public Works and Highways
DPWH-QMSP-DH02-Rev.
03
INTERNAL QUALITY AUDIT PLAN FOR CY
_
Purpose: 1. 2. 3. Area
Process/es
Auditor Is
Criteria
Audit Schedule
Reviewed by:
Prepared by:
Internal Quality Audit Chairman
Internal Quality Audit Leader Approved by:
Undersecretary and Overall Quality Management Representative (QMR)
Page 1 of 1
•
Department of Public Works and Highways
D PWH-QMSP-03-
F03- Rev .03
INTERNAL QUALITY AUDIT ITINERARY FOR CY
_
Date Covered:
Bureau/ Office: Process Scope:
Criteria:
Date/ Time
Activitv
Areal Divisionl Unit
Auditor / s
Reviewed by:
Prepared by:
Internal Quality Audit Leader
Audit Team Leader Noted by:
Internal Quality Audit Chairman
Page 1 of 1
.Department
of PublicWorksand Highways
DPWH-QMSP-03-F04-Rev.03
INTERNAL QUALITY AUDIT CHECKLIST Area( s) I Office( s):
Process Scope:
Criteria:
Referencel Section No.
Itemsl Questions
C/NC IOFI
Remarksl Notes (Evidence Collected)
Reviewed by:
Prepared by:
Audit Team Leader
Audit Team Member Noted by: Internal Quality Audit Chairman
Page 1 of 1
DPWH-QSM P-03-FOS-Rev .03
Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
CENTRAL OFFICE Manila
Internal Quality Audit Summary Report
Office:
Date Audited:
Auditors:
Auditees:
Notes! Remarks:
Conformities
Total No.
Opportunity for Improvement (OFls):
Total No.
Nonconformities:
Total No.
Deadline of Submission of Accomplished CPARs:
Prepared by: (Name and Signature of AuditorsjTeam Members)
Reviewed and Approved by: (Name and Signature of Audit Team Leader)
Page 1 of 1
Department of Public Works and Highways
Quality Management System Manual
• 1.0
Control of Nonconforming Outputs Procedure
Issue Date: Doc. Code: Revision No.: Page No.
EB 2 B 2017 DPWH-QMSP-04
03 1 of 2
Purpose To define a system for identifying nonconforming outputs and applying the necessary control to prevent its unintended use or delivery.
2.0
Definition of Terms Nonconforming Output refers to an output that does not meet requirement. Disposition refers to action taken concerning the detected nonconforming output.
3.0
Procedure Process Flow
Identify nonconforming
Responsible
Details
Concerned Personnel
Nonconforming output may be detected during receipt, storage, or internal processing.
Concerned Personnel
Upon detection of nonconforming outputs, apply any of the following: • eliminate the detected nonconform ity • preclude its original intended use • take action when found after delivery or use has started
Concerned Personnel
Where applicable, accomplish the
output
\
Apply disposition
\11
Determine cause of nonconformity
CAR form, DPWH-QMSP-OSF01, in accordance with the Corrective Action Procedure, DPWH-QMSP-OS or appropriate form designed by the concerned office.
o \1
BE CERTAIN THATTHIS
IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
Control of Nonconforming Outputs Procedure Process Flow
Identify action plan
1 Implement action plan
Issue Date: Doc. Code: Revision No.: Page No.
FEB 2
B 03
2 of 2
Responsible
Details
Concerned Personnel
Gather data and, where needed, use appropriate techniques, e.g. brainstorming, cause and effect analysis, and the like.
Concerned Personnel
Use CAR Form to show action plans. to Corrective Action Procedure, DPWH-QMSP-05. Refer
4.0
References DPWH Quality Management System Manual, DPWH-QMSM PNS ISO 9001:2015 Standards Corrective Action Procedure, DPWH-QMSP-05
5.0
Records Corrective Action Request (CAR) Form, DPWH-QMSP-OS-F01
Prepared by:
6.~~~ ce.w-
B. ELIZABETHE~~
Assistant Secretary for Support Services Deputy Quality Management Representative
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
2017
DPWH-QMSP-04
Department of Public Works and Highways
Quality Management System Manual
• 1.0
Corrective Action Procedure
Issue Date: Doc. Code: Revision No.: Page No.
FEB 2
B
2017
DPWH-QMSP-OS
03 1 of 3
Purpose To define a system for identifying nonconformities,
determining the causejs of nonconformities,
and providing action to ensure that nonconformities do not recur.
2.0
Definition of Terms Nonconformity refers to non-fulfilment of a requirement. Correction refers to the action taken to eliminate the detected nonconformity. Corrective Action refers to an action taken to eliminate the causejs of detected nonconformity to prevent recurrence.
Corrective Action Request (CAR) Form, DPWH-QMSP-OS-F01,refers to the form used to document the detected nonconformity,
its causes, and the necessary correction and corrective
action.
3.0
Procedure Process Flow
Identify nonconformity
Responsible
Concerned Personnel
Details
Nonconformity may be identified through, but not limited to, the following: • Customer feedback and complaints • Conduct of internal quality audit • Day-to-day operation where there is nonfulfillment of QMS requirements
Use CAR form, DPWH-QMSP-OSFOl or appropriate form designed by the concerned office! personnel.
Review nonconformity and determine cause
Concerned Personnel
Review the nonconformity and determine the possible causejs using appropriate techniques, e.g. brainstorming, cause and effect analysis, and the like.
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
•
Quality Management System Manual Corrective Action Procedure
Issue Date: Doc. Code:
DPWH-QMSP-OS
Revision No.: Page No.
03 2 of 3
Responsible
Details
Concerned Personnel
Document and review the correction and corrective action plans thoroughly in coordination with other personnel involved to ensure effectiveness. Seek approval of concerned head.
Approve the proposed action plan
Concerned Unit Head
Approve the proposed action plans, otherwise will be returned to improve on the corrective action proposed. For CAR forms issued through internal quality audit, copies are kept by IAS. For other forms, copies are kept by the concerned office.
Implement correction and corrective action
Concerned Unit Head
Implement the approved action plans. Oversee the implementation of the action plans. For CAR forms issued through audit, verification of effectiveness of actions taken is done through the follow-up audit. For other forms issued outside audit, verification is done by the concerned office.
Process Flow
Prepare correction and corrective action
Also, revisit and update the Risk and Opportunities Register, if necessary. Determine if the action plan is effective
Concerned Personnel
If the action plan is effective, existing documents may be revised or new document may be created following the Control of Document
Procedure, DPWH-QMSP-Ol. Otherwise, if there is no need to create or revise the document, the concerned unit head auditors shall monitor the implementation
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Department of Public Works and Highways
Quality Management System Manual
•
Corrective Action Procedure
Process Flow
Create/revise document
Monitor implementation
4.0
Issue Date:
FEB 2 8 2017
Doc. Code:
DPWH-QMSP-OS
Revision No.: Page No.
03 3 of 3
Responsible
Details
Concerned Personnel
Document the results of action taken as part of the continual improvement program.
Concerned Unit Head Auditors
Summarize results of corrective action for Management Review.
References DPWH Quality Management System Manual, DPWH-QMSM PNS ISO 9001:2015 Standards Control of Documents Procedure, DPWH-QMSP-01 Management Review Procedure, DPWH-QMSP-07
5.0
Records Corrective Action Request (CAR) Form, DPWH-QMSP-05-F01
Prepared by:
~.ca~~.bt-
B. ELIZABETHE~P\ Assistant Secretary for Support Services Deputy Quality Management Representative
. ASIS aersecretary for Technical Services Overall Quality Management Representative
BE CERTAIN THAT THIS IS THE CURRENT VERSION BEFORE USING THIS DOCUMENT
Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
•
OFFICE OF THE SECRETARY Manila
Corrective
Action
Report
(CAR) DPW H-QM SP-OS-FOI-Rev .03
Section 1 - Details of Nonconformity (To be accomplished by the Auditor/Initiator) References:
Date:
CAR Number:
(manuals, procedures, policies,
ISO clauses, etc.)
Auditor/
Nonconformity
Initiator:
requirement)
Initiator:
Issued To : Details:
D
Office:
(As a result of)
Internal
Quality Audit
D
Service Realization
D
Other (Pis. specify) Issued to:
Issued by :
(Office Head)
Signature over Printed Name
Signature over Printed Name
Description
(Nan-fulfillment
of the Nonconformity/OFI:
(Include evidence)
Acknowledged
by:
Section 2 - Necessary Action(s) (To be accomplished by the Auditee/Process Owner).
Target Completion
Correction:
Analyzed By:
Root Cause Analysis:
Described the necessary Corrective
Approved
Date:
Action{s):
Target Completion
By :
Note: Submit to IAS within
Date:
10 days upon receipt. Section 3 - Verification of Effectiveness (To be accomplished by the Initiator) Remarks
Results of Action(s) Taken
Acknowldeged
Verification
:
Verified By
Date
Next Verification
By
Date: Remarks
Results of Action(s) Taken
Verification
Verified By Acknowldeged
Date
Next Verification
By
Page 1 of 1
Date:
of
017
Issue Date:
Department of Public Works and Highways
•
1.0
Management
Review Procedure
Doc. Code: Revision No.: Page No.
DPWH-QMSP-06 03 Page 1 of 3
Purpose
To provide a guide for reviewing the DPWH Quality Management System (QMS) to determine its suitability, issue courses of action and provide resources for its improvement.
2.0
Definition of Terms Management Review refers to the meeting conducted by the Management Committee to assess the quality management system and to introduce necessary actions for its continual improvement. Quality Management Representatives (QMRs) refer to the designated Management Committee members responsible for the conduct of Management Review in order to ensure continual improvement of the QMS in the Department. The designation is done through the issuance of Special Order (SO). (Please refer to SO No. 29, Series of 2013)
3.0
Procedure Process Flow
Responsible
START
Details
General Management Review of the QMS is held at least once a year for Department level, and at least twice a year for the specified groupings Planning and PPP, SRS, Technical Services, Support Services, UPMOs, Luzon Operations, and Visayas and Mindanao Operations. Overall QMR
Initiate the review
Respective Group QMRs
Initiate the review Department Level Discuss the agenda with the Group QMRs. Group Level Discuss the agenda with the Office QMRs. Included in the agenda for review but not limited to the following are: (a) project status reports (b) results of audit since last Management Review, (c) status of corrective, (d) customer (e) feedback (f) status of objectives and targets
BE CERTAIN THAT IT IS THE CURRENT REVISION BEFORE USING THIS DOCUMENT
Department
•
of Public Works and Highways
Management
Review Procedure
Issue Date:
FEB 2
Doc. Code:
DPWH-QMSP-06
Revision No.: Page No.
Process Flow
Responsible
B
2017
03 Page 2 of 3
Details (g) follow up actions from last management review, (h) changes that could affect the QMS, and (i) opportunity for improvement (j) changes in external and internal issues that are relevant to the QMS, (k) performance of external providers, (I) adequacy of resources, and effectiveness of actions taken to address risks and opportunities
Overall QMR/Deputy QMR
Notify committee members of the schedule of the review meeting through a memorandum containing the agenda. Notification is done at least 3 working days before the scheduled date.
Overall QMR with the Group QMRs and Audit Chair
Conduct the Review The review is conducted as follows: 1. Discussion of the agenda. 2. Presentation of respective reports. 3. Evaluation of the QMS. 4. Agreement and approval of proposed actions. 5. Recording. See Management Review Minutes.
Notify members
Conduct review
Group QMR with Office QMRs and Audit Chair
All concerned Implement agreed resolutions
Implement agreed resolutions. Resolutions may involve revision of existing policies/ procedures or creation of new one. Follow the QMS Procedures on Internal Quality Audit, Control of Nonconforming Outputs, Corrective Action as appropriate
BE CERTAIN THAT IT ISTHE CURRENT REVISION BEFOREUSING THIS DOCUMENT
Issue Date:
Department of Public Works and Highways
•
Management
Review Procedure
Revision
No.:
Page No.
Process Flow
Monitor implementation
4.0
Doc. Code:
Page 3 of 3
Responsible
Details
Overall QMR/ Group QMR/ Office QMR
The Overall QMR exercises overall authority with regard to the implementation and monitoring of the QMS. Proper monitoring is supported by signed commitment among the parties involved. Status of monitoring and results are discussed in the next management reviews.
References DPWH Quality Management System Manual, DPWH-QMSM PNS ISO 9001:2015 Standards Internal Quality Audit Procedure, DPWH-QMSP-03 Control of Nonconforming Products, DPWH-QMSP-04 Corrective Action Procedure, DPWH-QMSP-05
5.0
Record Minutes of Management Review
Prepared by:
B.~.~~~ ELIZABETH.
P
Assistant Secreta for Support Services Deputy Quality Management Representative
S ersecretary for Technical Services Overall Quality Management Representative
BE CERTAIN THAT IT IS THE CURRENT REVISION BEFORE USING THIS DOCUMENT
ANNEX A
Department of Public Works and Highways Quality Management System
• Interested Party General Public Motorist Pedestrian Civil Society Organizations
FEB 2 B 2017
Doc. Code:
Annex A
Revision No.:
0
Page No.
lof9
Relevant Interested Parties Matrix
Type External
Reason for Inclusion Recipient of infrastructu re project
Tax Payer/Road User Tax Payer
General Public
Issue Date:
External
Needs and Expectations Expect high quality infrastructure & services Provide protection to lives and properties Expect on-time delivery of projects and services Ensure safety on the use of infrastructure
• • • •
Ensure environmentally compliant projects and infrastructure Regulatory Compliance
• • • •
Factor
Bias
Legal Social Economic Environment
Risk
Affected Process(es) Core Process
Priority
Treatment Method
High
• Risk Assessment • Management Review
High
• Risk Assessment • Management Review
High
• Risk Assessment • Management Review
Support Processes
Core Process Support Processes
• • • •
Legal Social Economic Environment
Risk
Core Process Support Processes
Core Process Support Processes
Legal Social Economic Environment
Risk
Core Process Support Processes
Core Process • Legal • Social
Mixed
Support Processes Core Process
High
Department of Public Works and Highways Quality Management System
• Interested Party
Issue Date:
FEB 2 8 2~17
Doc. Code:
Annex A
Revision No.:
0
Page No.
2 of 9
Relevant Interested Parties Matrix
Reason for Inclusion
Type
Civil Society Organizations
External
Constructors/ Contractors
External
Needs and Expectations
Factor
Recipient of infrastructure project
Preference to hire local residents
• Economic
"Watchdog" (refer to Ra9184)
Expect organization to be a "good example" locally Expect fair com petitive public bidding
• • • • • • • •
• •
Contract Awardee Builders
Expect prom pt payment of claims
Legal Social Economic Environment Legal Social Economic Environment
Affected process( es)
Bias
Priority
•
Risk
Human Resource Management • Financial Management • Information Management • Legal Services • Documentation Manaqement Core Process
• Opportunity and Risk Assessment • Management Review
High
Support Processes Mixed
Core Process
High
Support Processes
Risk
Core Process Support Processes
Treatment Method
High
• Risk Assessment • Management Review • Opportunity and Risk Assessment • Management Review • Internal Quality Audit • Risk Assessment • Management Review
Issue Date:
Department of Public Works and Highways Quality Management System
Doc. Code:
Annex A
Revision No.:
a
Page No.
3 of9
Relevant Interested Parties Matrix
Interested Party
Reason for Inclusion
Type
Needs and Expectations
Factor
Bias
FEB 2 B 2017
Affected Process(es)
Priority
Treatment Method • Internal Quality Audit
Expect fidelity in the legal norms/issuances/ contracts
Consultants
External
• •
Contract Awardee Service Provider
Expect fair competitive public bidding
• Legal • Social • Economic
Mixed
Core Process Support Processes
High
Mixed
Core Process
High
Support Processes
Expect prompt payment of claims
Risk
Core Process
High
Support Processes
Mixed
Core Process
High
• Opportunity and Risk Assessment • Management Review • Internal Quality Audit • Opportunity and Risk Assessment • Management Review • Internal Quality Audit • Risk Assessment • Management Review • Internal Quality Audit
Issue Date:
Department of Public Works and Highways Quality Management System
• Interested Party
Reason for Inclusion
Needs and Expectations
Factor
Bias
Annex A
Revision No.:
0
Page No.
4of9
External
• •
Contract Awardee Goods and Services Provider
Expect fair competitive public bidding
Expect prompt payment of claims
Expect fidelity in the legal norms/issuances
Affected process( es)
Priority
Support Processes
Expect fidelity in the legal norms/ issuances
Suppliers
Doc. Code:
Relevant Interested Parties Matrix
Type
• Legal • Social • Economic
Mixed
Risk
Mixed
FEB 2 B 2017
Core Processes
High
Support Processes
High
Core Processes
High
Support Processes
High
Core Processes
High
Treatment Method • Opportunity and Risk Assessment • Management Review • Internal Quality Audit • Opportunity and Risk Assessment • Management Review • Internal Quality Audit • Risk Assessment • Management Review • Internal Quality Audit • Risk Assessment
Issue Date:
Department
Quality Management System
• Interested Party
Business Sectors
Local Government Units
of Public Works and Highways
Doc. Code:
Annex A
Revision No.:
0
Page No.
50f9
Relevant Interested Parties Matrix
Type
External
External
Reason for Inclusion
Encourage investments
Recipient of products and services
Needs and Expectations
Quality and safe public infrastructure Properties / businesses protected from natural disasters Expect Loca I Projects to be implemented.
Expect compliance with all regulations
Factor
• • • •
Legal Social Economic Environment
Bias
Mixed
Priority
Support Processes
High
• Management Review • Internal Quality Audit
Core Processes
High
• Opportunity and Risk Assessment • Management Review • Internal Quality Audit
Medium
• Risk Assessment • Management Review • Internal Quality Audit
High
• Risk Assessment • Management Review • Internal Quality Audit
Support Processes
Support Processes Legal Social Economic Environment Political
Risk
Treatment Method
Affected Process(es)
Core Processes
• • • • •
FES 2 8 2017
Core Processes
Support Processes
Core Processes
Support Processes
Issue Date:
Department
Quality Management System
• Interested Party
of Public Works and Highways
Doc. Code:
Annex A
Revision No.:
0
Page No.
6of9
Relevant Interested Parties Matrix
Type
Reason for Inclusion
Needs and Expectations
Factor
Bias
Expect on time delivery of project
Affected Process(es) Core Processes
Priority
Funding Agencies
External
External
Recipient of products and services
Source of fund
Expect compliance with all regulations Expect on time delivery of project Expect implementation of projects that would complement their proiects Expect delivery of project within the approved project cost Expect on time delivery
• • • • •
Legal Social Economic Environment Political
Risk
Core Processes
Treatment Method .
High
• Risk Assessment • Management Review • Internal Quality Audit
High
• Risk Assessment • Management Review • Internal Quality Audit
High
• Risk Assessment • Management Review • Internal Quality Audit
Support Processes
National Government Agencies
FEB 2 8 2017
Support Processes Core Processes Support Processes Core Processes Support Processes
• • • • •
Legal Social Economic Environment Political
Risk
Core Processes Support Processes Core Processes Support Processes
Issue Date:
Department of Public Works and Highways Quality Management System
• Interested Party
Management Committee
Middle Management
Annex A
Revision No.:
0
Page No.
7of9
Relevant Interested Parties Matrix
Type
Internal
Internal
Reason for Inclusion
Sets the policy directions and targets of the Department
Implements the policy directions and targets of the Department
Needs and Expectations Expect compliance with all guideline Expect realization of the outcomes of the DPWH Strategy Map 2022 and identified long term strategies Expect compliance to policies Expect compliance with the requirements of ISO 9001:2015 Standards Ensure provision of adequate resources (Human Resource, Finance, Equipment, etc.)
Factor
Bias
FEB 2 B 7011
Doc. Code:
Affected Process(es)
Priority
Treatment Method
Core Processes Support Processes • • • •
Values Culture Knowledge Performance
Mixed
Core Processes
High
• Risk Assessment • Management Review • Internal Quality Audit
High
• Opportunity and Risk Assessment • Management Review • Internal Quality Audit
Support Processes
Risk
Opportunity
Core Processes Support Processes Core Processes Support Processes
• • • •
Values Culture Knowledge Performance
Mixed
Core Processes
Support Processes
Issue Date:
Department of Public Works and Highways Quality Management System
• Interested Party
Doc. Code:
Annex A
Revision No.:
0
Page No.
8of9
Relevant Interested Parties Matrix
Type
Reason for Inclusion
Needs and Expectations
FEB 2 8 2017
Factor
Bias
Affected Process(es)
Ensure a more organized and responsive workforce
• Values • Culture • Knowledge • Performance
Mixed
Core Processes
Deliver quality of performance
• • • •
Mixed
Priority
Treatment Method
to produce the required outputs Operationalizes the core and support processes
Personnel
Internal
Service delivery of the required output
Values Culture Knowledge Performance
Employee engagement
• On time salaries and
Support Processes
Core Processes
High
Support Processes
Opportunity
Expect appropriate learning & development programs
High
Core Processes
Medium
Support Processes
• Performance • Knowledge
Mixed
Core Processes Support Processes
High
• Opportunity and Risk Assessment • Management Review • Internal Quality Audit • Opportunity and Risk Assessment • Management Review • Internal Quality Audit • Opportunity Assessment • Management Review • Internal Quality Audit
Issue Date:
Department of Public Works and Highways Quality Management System
• Interested Party
Reason for Inclusion
Needs and Expectations
•
wages and benefits Conducive environment for the operation of processes
Factor
Bias
B
Doc. Code:
Annex A
Revision No.:
0
Page No.
90f9
Relevant Interested Parties Matrix
Type
FEB 2
Affected Process(es)
• Values • Culture Core Processes Support Processes
Priority
2017
Treatment Method • Opportunity and Risk Assessment • Management Review • Internal Quality Audit
ANNEX B
Issue Date:
• Office: Process:
Activity Evaluation of unsolicited projects for PPP Scheme
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
Page No.
FEB 2 B 2017 Annex B 0 1 of 57
Public Private Partnership Service Strategic Planning
Risk Event Delayed evaluation of unsolicited projects due to non-compliance to guidelines
Likelihood (l) M
Consequence (if risk is encountered) Delayed implementation unsolicited projects
of
Severity
Risk Factor
M
M
Mitigation
Contingency
Responsible
A detailed updated guideline should be in place with the proper information to PPP concessionaire and concerned DPWH offices
Inform PPP concessionaire to revise the project alignment / location Coordinate with other DPWH Office like UPMOs or Regional Offices
Director of PPP
Concerned Division Chief Concerned Staff
Issue Date:
• Office: Process:
Activity Resolution of complaints
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
FEB 2 B 20il Annex B 0 2 of 57
Page No.
Stakeholders Relations Service Management Process - Feedback Management
Risk Event Delay in resolution of complaints because of the need for longer time in resolving complaints due to: a) Investigation and validation (ROW)
Likelihood (l) H
Consequence (if risk is encountered) Low customer satisfaction
Severity
Risk Factor
H
H
Mitigation
Contingency
Responsible
Review the existing process and applicability of the current "promptness" standard;
Issue follow up memos or Regional Office on-site validation of complaints
All DPWH Offices
Categorization of issues and prioritization something to do with policies and guidelines formulation
Hire additional job order personnel
Executive Committee
'.
Issue Date:
•
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.: Page No.
Risk Register b) Request for project funding
c)
Employment
d) Deluge of complaints from Presidential Hotline 8888
Unable to comply to ARTA law Unable to resolve as to prescribed time
Do a series of campaign on Core Values and other programs supporting values strengthening like SPMS, PGS, Strategic Planning, Teambuilding, Story of DPWH Unsung Heroes, etc., as it seems the root cause of the majority issues are deviations from core values, approved standards and processes. Additional manpower to call/inform the complainant and/or prepare Request for Action Memos
FEB 2
B
2017
Annex B 0 3 of 57
Stakeholders Relations Service
• Office: Process:
Activity Development of news/photo releases
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
a 4 of 57
Stakeholders Relations Service Management Process - Communication
Risk Event Release of erroneous news due to inaccurate data
likelihood (l) M
Consequence (if risk is encountered) Question of integrity in future DPWH statements
Decline in DPWH Customers Satisfaction Rating
Severity
Risk Factor
H
M
Mitigation Obtain clearance from Regional Directors prior to release of Regional data as national news Have the office of origin sign off the details in the news as correct prior to release
Contingency
Responsible
Park the release of news stories not yet vetted by concerned office until clearance is obtained
SRS
IOs
• Office: Process:
Activity Accreditation of CSO
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
0 5 of 57
Stakeholders Relations Service Management Process - Civil Society Organization Relations
Risk Event Accreditation of Bogus CSO
likelihood (L) M
Consequence (if risk is encountered) Integrity of CSO engagement is endangered
Severity
Risk Factor
H
M
Mitigation
Contingency
Responsible
Validate with due diligence the authenticity of CSOs
Counter checking with DSWD's CSO database
SRS
Come up with guidelines on monitoring activities of CSOs
• Office: Process:
Activity Data Gathering 1. Road and Bridge Inventory (DEO)
2. Road
3.
Condition (DEO) Traffic Inventory (DEO)
4. Uploading (RO)
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
a 6 of 57
Planning Service Planning Process
Risk Event
Likelihood (L)
1. Inaccurate data
Consequence (if risk is encountered)
Severity
Risk Factor
Inaccurate generation of prioritized list of projects
gathered due to:
Mitigation
Review of data gathering process.
a) lack of manpower
L
H
M
Thorough data quality checking.
b) untrained personnel
M
H
H
Proper planning and scheduling of manpower.
c) questionable motivation
L
H
M
d) survey equipment failure
L
H
M
Conduct of trainings and cascading regarding data gathering. Coaching and mentoring.
Contingency
Tap other knowledgeable personnel from other section/ division. Close supervision of concerned personnel. Recalibration or Immediate repair of survey equipment
Responsible
ROs, DEOS and Planning Service
• 5. Flood Control
6. Road Right of Way
Issue Date:
FEB 2 B ZQ17
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.: Page No.
Risk Register 2. delayed of uploading due to network issues
L
H
M
Regular network maintenance
Incomplete data gathered due to unavailability of Flood Control Structures data Wrong information gathered
H
H
H
Establish a database for the location and inventory of flood control structures
M
Over/Under Compensation to right person
Compensation to wrong person Delayed project implementation
H
H
Establish a database in coordination with LRA with the following information: 1. DPWH or Gap owned projects
2. Outstanding ROW Claims 3. PPP projects
0 7 of 57
Upload data to areas where network is available SaM / FCMC Use of historical records for reference Legal action
Legal Service/ Staff
• 7. Environmental and Social Survey (*feasibility of work during non-regular working hours) 8. Validation (CO/RO/DEO)
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register Wrong information gathered
Failure to validate data objectively due to: a) Absence of standard validation procedure b) Untrained personnel
H
Delayed project implementation
Page No.
H
H
H
M
H
Establish standard validation procedure
Coaching and mentoring.
L
M
L
Conduct of trainings and cascading regarding data gathering.
Close supervision of concerned personnel.
Wrong ranking due to inaccurate data gathered.
H
H
Ensure the quality and integrity of data gathered in compliance with D.O. 124 (RBIA).
Correct the data inconsistencies
S of 57
Inaccurate generation of prioritized list of projects
Project Identification 1. Initial ranking (DPD - PS)
0
H
Wrong projects identified.
Re-run of HDM4.
Planning Service
• 2. Validation (RO/DEO) (ongoing, completed, committed, structural defects warranty)
3. Initial Budget Proposal for presentation to Regional Development Council (IOs)
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.: Page No.
Risk Register
0 g of 57
Inaccurate generation of prioritized list of projects
Failure to validate data objectively due to:
a) absence of standard validation procedure
H
M
H
Establish standard validation procedure
Coaching and mentoring.
b) untrained personnel
L
M
L
Conduct of trainings and cascading regarding data gathering.
Close supervision of concerned personnel.
Revised project proposal due to Political Intervention
H
H
H
Delayed project implementation
Misallocation of resources
Planning Service
PS I RO IDEO
ManCom
IExeCom
• 4. Stakeholder Consultation (Civil Society Organizations)
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register Revised project proposal due to Political Intervention
H
Lapse of funding allocation
Page No.
H
H
a 10 of 57
ManCom jExeCom
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
• Office: Process:
Activity 1. Engineering Survey (PDD / PDS)
a) Subsurface Exploration
b) Traffic Survey c) Utility Survey (Water lines, electrical lines, telecommu nication lines, MMDA
Risk Register Bureau of Design/Implementing Preparation of Plans
Risk Event Failure to conduct survey due to:
a) lack of survey equipment and loqistics b) lack of manpower
Likelihood (l) H
Page No.
a 11 of 57
Office (ROs, DEOs and UPMO)
Consequence (if risk is encountered) Plans prepared are not reflective to the actual site condition
Severity
Risk Factor
H
H
Mitigation Procurement of equipment and logistics
Outsourcing of manpower
Contingency Tap other knowledgeable personnel from other section/ division.
Responsible 10
•
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
0 12 of 57
sensors, etc. )
d) Tree Survey
2. Plans, Design and Specifications (PDD/PDS)
3. DUPA (PDD/PDS) *CMPD for reference (CD / CS) POW (PDD/PDS) ABC (PDD/PDS)
Inaccurate plans, design and specifications due to inaccurate engineering survey Wrong cost estimate due to Inaccurate plans, design and specifications due to inaccurate engineering survey
H
Increase the likelihood of VO/CO/EWO.
H
H
Proper conduct of detailed engineering in accordance with existing department issuances.
Variation Orders during Project Implementation
10
L
Costly projects
H
M
Proper conduct of detailed engineering in accordance with existing department issuances.
Variation Orders during Project 1mplementation
10
• 4. Preparation of Plans (Inhouse)
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register Delayed completion of design plans due to lack of com petent personnel and design software with compatible hardware No standard design procedurefrevie w process
Page No.
H
Delayed approval of design plan
H
H
H
Delayed project procurement
H
H
Train design engineersf architects using the latest design technology and tools in compliance with updated guidelines, criteria and standards Procure latest design software and hardware to fully automated and timely design preparation with accurate results. Institutionalize an improved plan review process and ensure quality desiqn product Conduct design audit
0 13 of 57
Request additional plantilla positions
Bureau of Design
Outsourcing
Implementing Offices
DPWH Secretary
• 5. Preparation of Plans (Outsourced)
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register Delay/inaccurate design analysis due to lack of strict monitoring by the Implementing Office
H
Additional cost (Variation Order)
Page No.
H
H
Strict compliance of the approved Terms of Reference
Extend the services of the Consultants at no additional cost Evaluation of Consultant's Performance Sanction/legal action against the Consultants/Firm
0 14 of 57
Bureau of Design
Implementing Offices DPWH Secreta ry
• Office: Process:
Activity 1. Quality Audit
2. Road Safety Audit
Issue Date:
Department of Public Works and Highways
FEB 2 B 2017
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
0 15 of 57
Bureau of Quality and Safety Quality and Safety Assurance Audit
Risk Event Non-compliance with proper quality audit methodology due to lack/poor maintenance of quality audit equipment
Failure to conduct comprehensive road safety audit
Likelihood (l) M
M
Consequence (if risk is encountered) Failure to conduct comprehensive quality audit
Failure to road safety issues
Severity
Risk Factor
M
M
M
M
Mitigation Conduct study to identify the actual required number of units Conduct regular preventive maintenance
Calibration on existing quality audit equipment Purchase additional quality audit equipment Conduct study to identify the actual required number of units
Contingency
Responsible
Perform appropriate corrective maintenance Request for additional funds to cover unexpected quality audit equipment breakdown
Bureau Quality and Safety
Perform appropriate corrective maintenance
Bureau Quality and Safety
•
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register due to lack of competent personnel
Page No.
Conduct regular preventive maintenance
Calibration on existing quality audit equipment Purchase additional quality audit equipment
Request for additional funds to cover unexpected quality audit equipment breakdown
0 16 of 57
• Office: Process:
Activity 1. Selection of Audit Teams/ Auditors
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
0 17 of 57
Internal Audit Internal Audit
Risk Event
Likelihood (L)
1. Selected auditors
L
may not have the competency requirements due to insufficient traininqs 2. Selected auditors may have biases and not observe independence due to familiarity with the auditee
L
Consequence (if risk is encountered) Result of audit is not objective
Severity
Risk Factor
H
M
Conduct trainings and seminars on relevant updates in laws, rules and regulations
Coaching and mentoring from immediate supervisor
H
M
Auditors shall not be assigned to same/previously audited offices Require attendance to values formation proqrams.
Bench auditor after due process
Mitigation
Contingency
Review working papers
Responsible IAS
Issue Date:
• 2.
Identification of audit areas, procedures and criteria
3. Conduct of audit
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register Incomplete audit findings due to error in sampling and misapplication of audit criteria Auditors may have different interpretations due to sometimes conflicting or inconsistent rules, regulations and orders
Page No.
L
Unsubstantiated audit results
H
M
M
Different audit recommendations
M
M
Standardize audit checklist and procedures Proper coordination with concerned process owner Proper review of Department Orders and policies Offices affected by new DOs should provide comments prior to issuance of DO Strictly observe preparation of Policy Impact Analysis
FEB 2 B 2017 Annex B
0 18 of 57
Review and revise audit procedures and criteria
IAS
Elevate the matter to the management and/or the Legal Service for a more authoritative position.
IAS
Issue Date:
• Office: Process:
Activity 1. Acquisition of Site or location for Right of Way of National Gov't. projects
2. Removal of site obstructions (utilities)
3. Payment of outstanding claims
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
Page No.
FEB 2 8 2017 Annex B
0 19 of 57
Legal Service / Legal Staff Legal Service
Risk Event 1. Refusal of owners to vacate their properties due to low offer of the qovernment 2. Conflicting claimants 3. Ownerjs unknown 4. Unregistered property Refusal of utilities to relocate site obstructions due to non-payment of relocation cost 1. Insufficient funds released due to lack of allocated
Likelihood (L)
Consequence (if risk is encountered)
H
Severity
Risk Factor
H
H
The proposed project may not push through
Mitigation Prompt and immediate payment of just compensation
Delayed project implementation
Contingency
Responsible
File expropriation case
Legal Service
Issue demand to occupant to vacate premises
H
Delayed project completion
H
H
H
Delayed payment of
H
H
Prompt payment of relocation costs upon the approval of the guidelines issued by the DOE and DPWH Request appropriation of funds
Issue notice that DPWH will remove the obstructions at the expense of the utility company Proper coordination with
•
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
the Implementing Offices
funds for the purpose
2. Lack of
Claims compensation Duplication of payment
competent personnel to validate/ evaluate claims
4. Preparation of Legal Opinion
5. Review of Contracts
6. Conduct of Investigation
Training/Seminar/W orkshop to employees involved in the va Iidation/ eva Iuation of claims
Payment of invalid claims
Lack of legal basis due to absence of jurisprudence
L
Insufficient documentary requirements due to noncompliance with the checklist Biased or prejudiced investigation/dec ision due to influence of respondents/offic ials, etc.
L
L
Wrong decision made Conflicting opinions with different DPWH Offices Approval of contract is delayed
Wrong decision made
H
M
Regular updates of jurisprudence, rules and regulations and issuances of other government agencies
Recall / revise legal opinion/ request DOJ opinion
M
L
Conduct periodic training of personnel involved in contract preparation/review
Require concerned office/personnel to comply with the requirements before submission
M
L
Develop checklist as basis for decision
Re-evaluate investigation results
0 20 of 57
• Office: Process:
Activity Inland Channel Dredging Project by Administration
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
0 21 of 57
Bureau of Equipment Project Implementation
Risk Event Delayed completion of inland dredging by administration due to insufficient provision of budget
Likelihood (L) H
Consequence (if risk is encountered) Damaged to loss of lives and properties
Delayed completion to noncommencement of dredging projects
Severity
Risk Factor
H
H
Mitigation
Contingency
Responsible
Ensure provision of budget in the National Expenditure Program and General Appropriations Act Institutionalize Annual Dredging Program and Management
File immediately request for budget from allowable MOOE available funds
Undersecretary for Technical Services / Assistant Secretary for Technical Services / Financial Service / Planning Service / UPMO-FCMC / IOs / BOM
Monitor Dredging Budget Utilization
•
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
~
Office: Process:
Activity Undertake infrastructure asset maintenance
Risk Register
Page No.
0 22 of 57
Bureau of Maintenance Infrastructure Asset Maintenance
Risk Event Recurrence of defects due to poor quality of maintenance works
likelihood (L) H
Consequence (if risk is encountered) Increased maintenance cost
Increased frequency of repair
Costlier future rehabilitation work
Severity
Risk Factor
H
H
Mitigation Apply appropriate maintenance activity thru the Annual Maintenance Work Proqram Equip maintenance crew with sufficient knowhow on proper infrastructure knowledge and methodoloqy Provide sufficient basic road maintenance equipment and tools
Contingency Close supervision and strict enforcement of quality control during maintenance operations
Responsible Bureau of Maintenance
Implementing Offices
• Office: Process:
Activity Inspect / validate compliance of all Districts to policy guidelines on the maintenance of infrastructure
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
0 23 of 57
Bureau of Maintenance Inspectorate and Monitoring
Risk Event Failure to complete inspection/ validation of compliance of District Engineering Offices to the policy guidelines on the maintenance of infrastructure due to: a) Lack of personnel
Likelihood (L)
Consequence (if risk is encountered)
Severity
Risk Factor
Mitigation
Contingency
Insufficient data required for the evaluation of performance of the DEOs and the analysis of the result of inspection/ validation
H
Responsible Bureau of Maintenance
H
H
Plan and schedule inspection / validation in coordination with other Divisions and Offices
Engage concerned RO personnel in the inspection / validation
Implementing Offices
•
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
b) Adverse weather condition
H
H
H
c)
H
H
H
Peace and order
Train additional personnel on the conduct of inspection /validation activity Increase area of coverage per inspector / staff Plan schedule of inspection/va Iidation based on historical weather data
Use of latest technology and modern gadgets to monitor areas with peace and order issues
Reschedule conduct of inspection/ validation with increased number of inspectors Seek the assistance of local authorities during inspection/ validation activity
0 24 of 57
• Office: Process:
Activity Construction of smalljfullscale pilot trials.
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System Risk Register
Revision No.: Page No.
0 25 of 57
Bureau of Research and Standards Research and Development Management
Risk Event Delayed implementation due to lesser priority given by the concerned implementing office .
Likelihood (l) M
Consequence (if risk is encountered) Delayed evaluation of new products and marginal materials.
Severity
Risk Factor
L
L
Mitigation Close coordination with the implementing offices, product proponent and the contractor
Contingency
Responsible
Request to implementing Office for site identification sent on the first quarter of the year. Sampling and testing of materials for the pilot trials completed prior to site identification .
Bureau of Research and Standards /DPWH Implementing Office / Product Proponent
Issue Date:
• Office: Process:
Activity Standard specifications formulation
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
Page No.
FEB 2
B
2017
Annex B
0 26 of 57
Bureau of Research and Standards Research and Development Management
Risk Event Delayed formulation of standard specifications due to insufficient international references such as ASTM, MSHTO, ACI, etc.
Likelihood (l) M
Consequence (if risk is encountered) Outdated specifications formulated
Severity
Risk Factor
L
L
Mitigation Seek assistance from other agencies such as D11 and DOST which are members of MSHTO and ASTM. Procure latest MSHTO and ASTM book of Standards and apply for membership of the same.
Contingency
Responsible Bureau of Research and Standards
• Office: Process:
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.: Page No.
Risk Register
0 27 of 57
Procurement Service Procurement Management
Activity
Risk Event
1. Preparation of Bid Documents
1. Bid Document is not compliant with the latest revisions of RA 9184, DPM, GPPB issuancesl resolutions and IFI's Evaluation Guidelines due to lack of competent personnel and/or lack of man power 2. Bid Document is inconsistent with approved plans,
TORI Specificationsl POW and ABC
Likelihood (L)
Consequence (if risk is encountered)
Severity
Risk Factor
Mitigation
Contingency
Responsible
M
Delayed bidding process (Advertisement I Publication)
H
H
Proper assignment and training of TWG on the latest revisions of RA 9184, DPM, GPPB issuancesl resolutions and IFI's Procurement Guidelines
Issue Bid Bulletin containing amendments and/or clarifications
Procurement Service I Unit Staff I Implementing Office
M
Bid proposals submitted by bidder not responsive with the actual project requirements
H
H
Proper assignment and training of TWG on the latest revisions of RA 9184, DPM, GPPB issuancesl
Issue Bid Bulletin containing amendments and/or clarifications
Procurement Service I Unit Staff I Implementing Office
• 2. Prequalification and Sid Evaluation
a) Performance Evaluation
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register due to lack of competent personnel and/or lack of man power Incorrect evaluation presented to SAC due to noncompliance with the approved set forth criteria for evaluation in the bidding documents Delay postqualification due to late reply of Implementing Unit including private firms regarding verification of performance
Page No.
Delayed bidding process (Advertisement / Publication)
a 28 of 57
resolutions and IFI's Procurement Guidelines
M
Sidder/s submitted motion for reconsideration which may prolong the procurement of the contract
H
M
Proper assignment and training of TWG on the latest revisions of RA 9184, DPM, GPPS issuances/ resolutions and IFI's Evaluation Guidelines
SAC thoroughly review the recommendation of TWG and recommend reevaluation if necessary
SAC/ SAC TWG/ Procurement Service
M
Prolonged procurement process
H
H
Specify the deadline of submission of verifications & continue postqualification if not submit on specified date
Reiterate to Implementing Office the submission of the verification project status
SAC/ SAC TWG/ Procurement Service/ Implementing Office
•
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
29 of 57
L
Prolonged procurement process
H
M
Specify deadline of submission of verification
Reiterate to Bureau of Quality and Safety the submission of the verification project status
BAC/ BAC TWG/ Procurement Service/ Bureau of Quality and Safety
1. Delay of award due to unavailability of "permit to enter"
L
Delayed project implementation
H
M
Request bidder to extend its bid and bid security validity
BAC/ Procurement Service/ Implementing Office
2. Delay of award
L
Delayed project implementation
H
M
Presentation of status of "permit to enter" in the PPCto assure its acquirement. (Ensure that before any project could start the bidding process proper due diligence shall be conducted including status of status of ''permit to enter" in the PPC to assure its aCQuirement) Emphasize administrative sanctions in the PreBid Conference
Delay in the evaluation due to incomplete evaluation of the Bidders Performance
b) Award of Contract
Page No.
0
because LCRB/HRRB did
Impose sanctions based on Sec. 69 of the revised IRR of RA 9184.
BAC! BAC TWG/ Procurement Service
Issue Date:
•
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register not accept award of contract
In case of lone bidder (failure of bidding)
Page No.
Proceed with next LCBjHRB, else in case of lone bidder; BAC recommends failure of biddinq
FEB 2 8 2017 Annex B 0 30 of 57
• Office: Process:
Activity
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System Risk Register
Revision No.: Page No.
0 31 of 57
Financial Service Financial Management
Risk Event
Likelihood (l)
Consequence (if risk is encountered)
Severity
Risk Factor
H
H
Mitigation
Contingency
Implementing Office should fast track the identification of claimants and the preparation of the required supporting documents especially if there are voluminous request for issuance of Obligation for RROW Fast track the Procurement process to facilitate the awarding of contracts for the issuance of Obligation
The incurrence of Low Absorptive Capacity (Ae) will be reported to the concerned Undersecretary for appropriate action
Responsible
Fund Control Accounting Preparation of Obligation Request and Status (ORS)
Non-issuance of Obligation due to non-submission of Memorandum Request for Obligation by the implementing office on:
M
Lapsed Fundingthe Department shall request again for the release of funding
a) SARO
a) Road Right of Way (RROW)
Low Absorptive Capacity
b) GAA
b) Project Implementation
Delay in the processing of Disbursement Vouchers.
Issuance of Memorandum reminding the Implementing Office that funds will lapse.
Implementing Office
Budget Division
•
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
a 32 of 57
Fiscall financial Accountability Preparation and submission of Budget and Financial Accountability Reports (BFARs)
Delay in the preparation and submission of BFARs to COA and DBM due to non- compliance of Regional/District Offices to submit reports on the set deadline.
M
Inclusion to COA Audit Findings Non-entitlement of the Department to PBB
H
H
Full implementation of technology like the eNgas and eBudget version 2 for easy preparation of the reports
Imposition of Sanctions for failure to comply with the deadline
Finance Service Regional Office
Issue Date:
•
Department of Public Works and Highways
Doc. Code:
Quality Management System Risk Register
Revision No.: Page No.
FEB 2 B 2017 Annex B 0 33 of 57
Reporting Preparation and submission of Consolidated Annual Financial Report
Delays in the preparation and submission of Financial Reports to COA and DBM are due to the non-compliance of Regions and District Offices on the set deadline/ guidelines
M
Issuance of Audit Findings by COA
Non-entitlement of the Department to PBB
H
H
Full implementation of technology like the eNgas and eBudget version 2 for easy preparation of the reports
Imposition of sanctions to Offices who failed to comply with the set deadline
Finance Service
Regional Office
Issue Date:
• Office: Process:
Activity
Regular maintenance of facilities, buildings, pumping station, work environment, and sanitation
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
Page No.
FEB 2 8 2017 Annex B
0 34 of 57
Human Resource and Administrative Service Physical Resource Management
Risk Event
1. Breakdown of facilities and equipment (air con Offices, elevators, generator) due delay in the implementation of facility maintenance schedule
Likelihood (l) H
Consequence (if risk is encountered) Negative feedback of the Department from its internal and external stakeholders
Untimely facility aging/deterioration of facility spaces Increased utilities expenses
Severit y
Risk Factor
H
H
Mitigation
Draft a policy institutionalizing and standardizing Facility and Work Environment Management for all Department-owned Facilities, including Pumping Stations, and Buildings which covers: a) Audit
b) Space Management
Contingency
Conduct Root Cause Analysis
Perform immediately corrective maintenance Emergency Purchase of required supplies and materials
Responsible
Facilities Maintenance Division-Human Resource and Administrative Service
UPMO-FCMC
Implementing Offices
Issue Date:
•
Department of Public Works and Highways
Doc. Code:
Quality Management System Risk Register
Revision No.: Page No.
Increased facilities and work environment maintenance expenses
c) Operations and Maintenance
Increase frequency in facility repair
e) Resource Management (including Utility Consumption) Facility management automation
d) Health, Safety and Environment
Ensure annually that there is a standard facility maintenance plan and schedule, with approved budget allocation, for all facilities and buildinqs Study in Determining/ Establishing the right Facility Maintenance Crew and Craft for each Type of Facility/Building
FEB 2 B 2017 Annex B 0 35 of 57
Issue Date: Doc. Code:
•
Revision No.: Page No.
H
n
H
H
FEB 2 B 2017 Annex B 0 36 of 57
•
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
-
13.
Breakdown of facilities and equipment (air con, offices, elevators, generator) due to unavailability of supplies and materials
Risk Register
Page No. -
-
-
-
H
H
H
0 37 of 57
Issue Date
FEB
Doc. Code
•
Revision No Page No.
o 38 of 57
Human Resource and Administrative Service Human Resource Management
Risk Event
Likelihood
Contingency
(l)
H
2
2
Issuance of Appointment
Responsible
HRAS
H
H
Shortage of manpower
H
H
Participate n Job Fairs
Failure to address competency gap
H
H
Coordinate with Head Hunters
Termination of CSC Accreditation
H
H
HRAS
Enforce 0.0
2016
42
s
HRAS
•
Issue Date:
FEB 1 8 1017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.: Page No.
Risk Register Invalidation of appointment
applicants due to erroneous credentials
H
M
H
H
Establish policy and guidelines on background investiqation
0 39 of 57
Imposition of administrative sanction
Retention Strategy Retention Strategy
Fast turnover of personnel due to better job opportunities outside DPWH
H
Increased cost of training
Delayed project completion
Widen competency gap
Conduct programs on motivating millennial to stay in government
Increase awareness of supervisors on how to handle millennial Engage in job fairs
Improve employeremployee relationships based on current workforce trends Explore outsourcing (body shopping alternative)
HRAS
•
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
0 40 of 57
Performance Management Performance evaluation
Subjective evaluation due to the absence of SPMS Database
H
Demoralization among employees
H
H
Ensure the preparation and use of SPMS Database and Workflow to all offices by updating the standard job description for each position periodically Develop an application intended for SPMS Standardization of Database & Workflow for Region and District Offices
Compliance to CSC Rules and Regulations reimplementation of Strategic Performance Management System (SPMS)
HRAS
H
M
Ensure the preparation and use of SPMS Database and Workflow to all offices by updating the standard job description for each position periodically
Conduct investigation
HRAS
"Unqualified" employees receiving higher Performance Based Bonus (PBB)
Rewards and Recognition Granting of meritorious salary step increment
Subjective performance rating due to absence of SPMS Database and Workflow
L
Demoralization among employees
Employees who received meritorious salary
Develop an application intended for SPMS
•
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
step increment are not qualified
0 41 of 57
Standardization of Database & Workflow for the Region and District Offices by the Central Office Activate the PRAISE Committee
Learning and Development Learning needs assessment
Failure to address training needs of employees due to the absence the Individual Development Plans (IDP) Database
H
Competency gap not addressed
H
H
Issuance of Memo directing the submission of projected actual & prioritized training needs per Office with specific guidelines Develop the IDP Database Enhance Training Management System (TMS) Issue policy for submission of certificates of external training attended for inclusion in the TMS
Improve the implementation process of needs assessment
CDD, HRAS
Issue Date:
• Office: Process:
Activity 1. Demand Management
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
Page No.
FEB 2 8 2017 Annex B
0 42 of 57
Bureau of Equipment Equipment Fleet Management
Risk Event Failed to establish enduser actual equipment demand due to non-compliance of Needs Analysis procedure
Likelihood (l) M
Consequence (if risk is encountered) Acquired wrong equipment requirement and quantity Continuous fleet requirement deficiency
Lower equipment fleet utilization
Increased wastage in
Severity
Risk Factor
H
H
Mitigation
Contingency
Responsible
Compliance and enforcement of DO 64 s.2016
Immediately review and revise results of Needs Analysis
Bureau of Equipment
Continuous learning and training of concerned in Equipment Fleet Demand Manaqement Establish a policy in the use of Life Cycle Costing and Analysis Adopt ISO 55001:2014 - "Asset Management: Management Systems Requirements" Physical Asset Management Automation
Inform concerned end-user
Implementing Offices
•
Issue Date:
FEB 2 B 7017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.: Page No.
Risk Register
0 43 of 57
resources optimization
2. Systems Engineering
Wrong equipment specification due to lack to research and publication materials
M
Acquired wrong equipment requirement Lower equipment fleet utilization
Increased wastage in resources optimization
H
H
Compliance and enforcement of DO
64-2016 Continuous learning and training of concerned in Equipment Fleet Demand Manaqement Establish a policy in the use of Life Cycle Costing and Analysis Establish guidelines and procedure in determining Equipment Specification relative to Actual End-User Requirement Adopt ISO 55001:2014"Asset Management: Management Systems Requirements"
Immediately review and revise Equipment Specification Inform concerned end-user
Bureau of Equipment
Implementing Offices
Issue Date:
• 3. Acquisition
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
Delayed acquisition of fleet requirements due to lack or non-participation of suppliers in the Public Bidding
M
Delayed Refleeting Program
Page No.
H
H
Physical Asset Management Automation Conduct continuous market and supplier availability research
Insufficient Fleet Size to respond to road maintenance program and quick response
Conduct continuous updating of equipment pricing
Fund reversion to national treasury
Ensure equipment specification covers wider brands and dealers Careful preparation prior to the start of the Public Bidding Process Adopt ISO 55001:2014 - "Asset Management: Management Systems Requirements" Physical Asset Management Automation
Immediate conduct of Root Cause Analysis of the Public Bidding Failure Reschedule Public Bidding (Rebidding)
FEB 2 B 2017 Annex B
0 44 of 57
BAC for Goods
Bureau of Equipment
Implementing Offices
Issue Date:
• 4. Disposal of obsolete/ uneconomical! unserviceable equipment
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register Failed disposal, thru public auction proceeding, due to nonparticipation auctioneers
H
Failure/Delayed the Re to fleeting Program
Low Equipment Utilization
Increased in the Liability Portfolio of the Department "Bloated" Fleet Inventory Missed revenue
Page No.
H
H
Review and updating of the DPWH Basic Highway Maintenance Equipment Refleetinq Proqram Annual Nationwide Disposal Plan and Schedule for Implementation in the followinq year Review of the extent of coverage of the publication company and notification procedure Regular survey of scrap to metal buying companies Designation of dedicated staff to perform regular assessment and updating of scrap metals price Adopt ISO 55001:2014"Asset Management: Manaqement
Immediate conduct of Root Cause Analysis of the Public Auction Failure
Re-schedule public auction
FEB 2
B 7017
Annex B
a 45 of 57
Central Disposal Committee
Bureau of Equipment /Implementing Offices /Regional Disposal Committee
•
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
0 46 of 57
Systems Requirements"
5. Operations and Maintenance (O&M)
Failed to conduct prescribed Preventive Maintenance by End- users jROs'jDEOs'jCen tral Office Motorpool due to absence of Annual Preventive Maintenance Plan & Schedule
M
Increased road maintenance activities backlog
No programmed road maintenance activity performed
H
H
Physical Asset Management Automation Creation of Policy Institutionalizing and Requiring all BOEj Regional OfficesjDEOs' Performing Annual Preventive Maintenance Planning and Schedulinq Closed coordination with the Bureau of Maintenance in developing an equipment maintenance plan and schedule that will support the Annual Maintenance Work Program (AMWP)
Immediate conduct of Root Cause Analysis of risk occurrence
Bureau of Equipment
Implementing Offices
•
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
Delayed to none dispatching to disaster to stricken areas
Implement Reiiabi Iity-Centered Maintenance
Increased frequency of equipment/ service vehicles' failure
Conduct training on maintenance planning and scheduling Adopt
Increased occurrence of corrective maintenance Low Equipment Utilization Low Equipment Availability Increased maintenance expenses Improper utilization of resources
ISO 55001:2014 "Asset Management: Management Systems Requirements" Physical Asset Management Automation, including PM Proqram automation
0 47 of 57
Issue Date:
• 6. Configuration Management
Department of Public Works and Highways
Doc. Code:
Quality Management System Risk Register
Revision No.:
Wrong equipment rehabilitation procedure performed due to lack of operations and maintenance history
M
Wastage of funds and other resources utilized
H
Page No.
H
Compliance and enforcement of DO
64-2016
Increased in "Infant Mortality" type of equipment failure
Implement Reliability-Centered Maintenance
Shorter equipment life
Establish Equipment Failure History Recording Procedure and Database Establish policy and procedure on Equipment Rehabilitation and Component & Parts Transfer Continuous learning and training of concerned in Equipment Fleet Demand Management
Failed to increase to the right fleet size
Immediate conduct of Root Cause Analysis of risk occurrence
FES 2 8 2017 Annex B
0 48 of 57
Bureau of Equipment Implementing Offices
•
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register
Page No.
Establish a policy in the use of Life Cycle Costing and Analysis Adopt ISO 55001:2014 - "Asset Management: Management Systems Requirements" Physical Asset Management Automation
0 49 of 57
• Office: Process:
Activity Verification/ Calibration of Engineering Survey, Laboratory and Field Testing Equipment
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.: Page No.
Risk Register
0 50 of 57
Bureau of Research and Standards, Bureau of Design, and Bureau of Quality and Safety Engineering Survey, Laboratory and Field Testing Equipment Management
Risk Event Inconsistent test result due to verification /calibration of equipment accuracy
Likelihood (l) H
Consequence (if risk is encountered) Poor Project Quality
Severity
Risk Factor
H
H
Mitigation
Contingency
Responsible
Formulate Policy and Guideline for the Semi to Annual Verification/ Calibration of Engineering Survey, Laboratory and Field Testing Equipment
Perform corrective maintenance (if can be done in house) Refer to other accredited/ designated calibrating laboratory
Bureau of Design / Bureau of Research and Standards /Bureau of Quality and Safety
Issue Date:
• Office: Process:
Activity Verification and calibration of laboratory testing equipment
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.: Page No.
Risk Register
~l:tl
2 8 2017
Annex B 0 51 of 57
Bureau of Research and Standards Physical Resource Management
Risk Event Inaccurate test results due to lack of training of technical personnel in equipment calibration and irregular calibration of laboratory testing equipment
Likelihood (L) M
Consequence (if risk is encountered) Potential inclusion of substandard materials in the project.
Poor quality of projects
Severity
Risk Factor
H
H
Mitigation
Contingency
Responsible
Monitor, thru appropriate Preventive Maintenance, regularly the accuracyj reliability of equipment in the laboratory
Conduct investigation and root cause analysis
Bureau of Research and Standards j DPWH Implementing Offices
Provide training for technical personnel and implement existing calibration program and maintenance of equipment
Refer to other accreditedjdesigna ted calibrating laboratory.
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
• Office: Process:
Activity 1. Identification of needs
2. Development of application system
Risk Register
Page No.
0 52 of 57
Information Management Application Development
Risk Event Needs are overlooked by business analysts due to lack of familiarity with DPWH business processes
1. Unmet timelines in the completion of prioritized applications due to unprogrammed requests from offices 2. Unmet timelines in the completion of prioritized applications due
Likelihood (L) M
M
M
Consequence (if risk is encountered) List of priorities does not match the actual needs Business processes will not be enabled by technoloqy Delayed completion of application
Technologyenabled business process improvements are hindered
Severity
Risk Factor
L
M
M
M
M
M
Mitigation
Contingency
Responsible
Exposure to the different business processes of DPWH
Conduct skills inventory and reassign personnel to the appropriate area
Business Innovation Division, IMS
Hire additional skilled personnel
Application Support Division, IMS
Training to strengthen business analysis skills of BID personnel Establish guidelines on the observance of the order of prioritization
Augment manpower complement
Issue Date:
•
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
Page No.
FEB 2 8 2017 Annex B
a 53 of 57
to insufficient manpower
3. Deployment
4. Maintenance
Application Support Div. (ASD) and Technology Support Division (TSD), IMS
Deployment of application is delayed due to incomplete documentation requirements
L
Efficiency and productivity of the concerned office will be compromised
M
L
Reiterate compliance with application deployment procedure
1. Unmet Service
M
Efficiency in service delivery is impeded and productivity of the concerned office will be compromised
M
M
Establish guidelines on solution prioritization Augment manpower complement
Hire additional skilled manpower
Loss or unusability of data
H
Establish Business Continuity Planning (BCM) as part of our risk management program Ensure regular back-up of databases Ensure back-up is stored offsite
Send IT security officers to training
Level Agreement (SLA) to resolve incident reported in the IT Service Desk due to insufficient manpower 2. Lost or damaged data due to natural disaster, virus infection, or hacking (IT Security breaches)
L
Disruption of business continuity
M
User Support Division, IMS
Authorize overtime on high priority incidents
Technology Support Division, IMS
Issue Date:
•
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.: Page No.
Risk Register
FEB 2 B 2017 Annex B 0 54 of 57
Ensure anti-virus software is updated
3. Fast updating of
L
Technologyenabled business process improvements are hindered Disruption of business continuity
H
M
Conduct periodical audit of IT assets versions vs current IMS skill set inventory Increase awareness in technology updates by attending IT conferences, symposiums. Strengthen the skills of the BID personnel
Maintain good relationship with IT service providers
H
Delayed completion of application
H
H
Conduct programs on motivating millennial to stay in government
IMS
Increase awareness of supervisors on how to handle millennia I
Improve employeremployee relationships based on current workforce trends Explore outsourcing (body shopping alternative)
Intensify recruitment program
Explore outsourcing (body
IMS
IT resources due to incompatibility of version
4. Lack of necessary technical knowhow on the new tech/version
5. Loss of technical support
6. Fast turnover of personnel due to better job opportunities in the private sector
7. Difficulty in the recruitment of IT professionals due
H
Technologyenabled business process improvements are hindered Delayed completion of application
H
H
All Divisions of IMS
Issue Date:
•
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register to few number of applicants
Technologyenabled business process improvements are hindered
Page No.
Participate in Job Fairs conducted by colleges and universities
shopping alternative)
FEB 7
B
2017
Annex B
0 55 of 57
Issue Date:
• Office: Process:
Activity 1. Records Management
2. Document Management
Department of Public Works and Highways
Doc. Code:
Quality Management System
Revision No.:
Risk Register
Page No.
FEB 2 B 2017 Annex B 0 56 of 57
Human Resource and Administrative Service Documentation Management
Risk Event 1. Returned mail due to incomplete address or change of address 2. Undisposed valueless records
1. Failure/Delay to disseminate copies of issuances down to the lowest Offices due to failure to check the intra net posts
Likelihood (l)
Consequence (if risk is encountered)
Severity
Risk Factor
Mitigation
Contingency
Responsible
L
Undelivered mails; inability to respond by the recipient
L
L
Diligence in determining contact data
Indicate postal codes for mailjs
HRAS
M
Overstocking of documents, clouded filing room, voluminous records Non-compliance to latest issuances during the period of delay
M
M
Annual Inventory of Non-Active Records
HRAS
H
H
Strict compliance with rules and regulations set by National Archive of the Philippines Utilize e-mail blast facility to all employees connected with WAN
H
Send hard copy to concerned office
RMD-HRAS
•
Issue Date:
FEB 2 B 2017
Department of Public Works and Highways
Doc. Code:
Annex B
Quality Management System
Revision No.:
Risk Register 2. Failure/Delay to
L
Page No.
H
M
disseminate copies of issuances down to the lowest Offices due to network disconnection
Likelihood: (L) Unlikely
(M) Likely
(H) Very Likely
Severity: (L) Low
(M) Medium
Issue a policy to all RITSO/DITSO and AOs regarding dissemination and retrieval of issuances Ensure network maintenance and security is in place
(H) High
Note: Action Plan is required for Risk Factor ~ M, Action Plan is required if regulatory or statutory requirement A risk is a specific event that could happen at some point in the future, Le .. "Insufficient
test resources" is not a risk. "Project is delayed because of insufficient test resources" is a risk
0 57 of 57
IMS
ANNEX C
Issue Date:
Department of Public Works and Highways
FEB 2 B 2017
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
1 of 13
•
Unit: Human Resource and Administrative Service Process: Documentation Management
Activity
Sending of Issuances to all units in the Department
Opportunity Event
Utilization of email blast facility to all employees connected with WAN
LEGEND: Likelihood - (1) Unlikely Note:
(2) Likely
Likelihood (l) Likely
(3) Very Likely
Benefit (if opportunity is encountered)
Benefit Rating (BR)
Benefit Factor (LxBR)
High
6
1. Instantaneous dissemination of Issuances 2. Decrease in use of physical resource. 3. significant savings in postage cost 4. Benefit for the environment
Benefit Rating - (1) Low
(2) Medium
Action Plan is required for Benefit Factor ~ 4, Action Plan is required
Action Plan(s)
Engage IMS disseminate Department emails of all
in helping new Orders to the email users
(3) High
if regulatory or statutory
requirement
Responsible
HRAS
Issue Date:
FEB 2 8 2017
Department of Public Works and Highways
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
2 of 13
•
Unit: Human Resource and Administrative Service Process: Human Resource Management
Activity
Opportunity Event
Benefit (if opportunity is encountered)
Benefit Rating (BR)
Benefit Factor (LxBR)
Likely
The Department is more likely to hire the best applicant among the pool
High
6
Likely
No room for bias in the performance rating
High
6
Very Likely
1. Improved personnel performance 2. Increased internal satisfaction
High
9
Strengthen advocacy on the rewards system of DPWH
HRAS
Likely
1. No funds are wasted 2. Bridge of competency gap
Low
2
Form a team to come up with guidelines
HRAS
Likelihood (L)
Action Plan(s)
Responsible
Recruitment, Selection and Placement Filling up of vacant position
Wide selection for best candidate due to Influx of candidates
1. Participate in job fairs 2. Engage in social media and print advertisements
HRAS
Performance Mana ~ement Performance evaluation
Strict implementation of SPMS due to previously reported concerns
HRAS
Rewards and Reco~nition Granting of meritorious salary step increment
Boosted morale of employees due to increased salary
Learning and Development Training needs assessment
Only important Training Programs are given priority
LEGEND: Likelihood - (1) Unlikely
(2) Likely
(3) Very Likely
Benefit Rating - (1) Low
(2) Medium
(3) High
Note: Action Plan is required for Benefit Factor 2: 4, Action Plan is required if regulatory or statutory requirement
Issue Date:
•
Unit: Process:
FEB 2
B
2017
Department of Public Works and Highways
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
3 of 13
Bureau of Equipment Project Implementation
Activity
Inland Channel Dredging Project by Administration
Opportunity Event
Reduced Capital Expenditure for Dredging Project by Contract
LEGEND: Likelihood - (1) Unlikely
(2) Likely
Likelihood (L) Likely
(3) Very Likely
Benefit (if opportunity is encountered) 1. Protect Lives and Properties 2. Protect environment 3. Reduced impact of climate change - flooding 4. Sustained improvement of dredging crew and fleet utilization
Benefit Rating (BR)
Benefit Factor (LxBR)
High
6
High
6
High
6
High
6
Benefit Rating - (1) Low
(2) Medium
Action Plan(s)
Responsible
1. Institutionalization of Annual Strategic Dredging Program and Management 2. Identification of Proposed Dredging Sites in Major Rivers and Flood-Prone Areas where Dredging-byAdministration is feasible 3. Strategic Dredging Fleet Refleeting Program
1. Undersecretary for Technical Services 2. Assistant Secretary for Technical Services 3. Financial Service 4. Planning Service 5. UPMO-Flood Control Management Cluster 6. Implementing Offices 7. Bureau of Equipment
(3) High
Note: Action Plan is required for Benefit Factor ~ 4, Action Plan is required if regulatory or statutory requirement
•
Unit: Process:
Department of Public Works and Highways
FEB 2 B 2017
Doc. Code:
Annex C
Quality Management System
Revision No.:
a
Opportunity Register
Page No.
4 of 13
Bureau of Maintenance Infrastructure Asset Maintenance
Activity
Undertake infrastructure maintenance
Issue Date:
Opportunity Event
asset
1. Generate additional employment in the local community 2. Further utilization of local materials
LEGEND: Likelihood - (1) Unlikely
(2) Likely
Benefit (if opportunity is encountered)
Benefit Rating (BR)
Benefit Factor
Very Likely
Contribution to poverty reduction through job creation
High
9
Very Likely
1. Price competitiveness 2. Faster delivery of materials
High
9
Likelihood (L)
(3) Very Likely
Benefit Rating - (1) Low
(2) Medium
Action Plan
Responsible
1. Bureau of Maintenance 2. Implementing Offices Sustain further utilization of local materials
(3) High
Note: Action Plan is required for Benefit Factor ~ 4, Action Plan is required if regulatory or statutory requirement
1. Bureau of Maintenance 2. Implementing Offices
Issue Date:
•
Unit: Process:
F
2017
Department of Public Works and Highways
Doc. Code:
Annex C
Quality Management System
Revision No.:
o
Opportunity Register
Page No.
5 of 13
Bureau of Maintenance Inspectorate and Monitoring
Activity
Inspectorate and Monitoring
Opportunity Event
Engagement of the public in reporting defects / deficiencies on infrastructure
Likelihood (L) Likely
Benefit (if opportunity is encountered) More timely response to the maintenance needs of infrastructure
Benefit Rating (BR)
Benefit Factor
High
6
Action Plan
Promote the use of the DPWH feedback mechanism
Responsible
1. Bureau Director 2. Assistant Bureau Director
3. Division Chiefs 4. Concerned BOM Staff
5. Regional Offices 6. District Engineering Offices
LEGEND: Likelihood - (1) Unlikely
(2) Likely
(3) Very Likely
Benefit Rating - (1) Low
(2) Medium
(3) High
Note: Action Plan is required for Benefit Factor ~ 4, Action Plan is required if regulatory or statutory requirement
•
Unit:
Process:
Issue Date:
Department of Public Works and Highways
FEB 2 B 2017
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
6 of 13
Bureau of Equipment Equipment Fleet Management
Activity
1. Operations and Maintenance (O&M)
Opportunity Event
1. Increased Fleet Operating Life due to sustainable PM Program Compliance
LEGEND: Likelihood - (1) Unlikely
(2) Likely
Likelihood (l) Likely
(3) Very Likely
Benefit (if opportunity is encountered) Lower or deferred capital expenditure from equipment acquisition
Benefit Rating (BR)
Benefit Factor
High
6
Benefit Rating - (1) Low
(2) Medium
Action Plan
1. Ensure 'On time' submission per standard Annual Preventive Maintenance (PM) Program 2. Monitor all end users and implementing offices Annual PM Program Compliance 3. Adopt ISO 55001:2014 - "Asset Management Standard" 4. Physical Asset Management Automation 5. Procurement of the latest and most appropriate preventive and (3) High
Note: Action Plan is required for Benefit Factor ~ 4, Action Plan is required if regulatory or statutory requirement
Responsible
1. Bureau Director 2. Assistant Bureau Director 3. Equipment Operation and Maintenance Division Chief 4. Floating Equipment Division Chief 5. Regional Office Equipment Management Division 6. DEO - Equipment Services Unit
Issue Date:
Department of Public Works and Highways
FEB 2 8 2017
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
7 of 13
• Activity
Opportunity Event
Likelihood (l)
Benefit (if opportunity is encountered)
Benefit Rating (BR)
Benefit Factor
Action Plan
Responsible
predictive maintenance equipment and tools
2. Decreased Equipment Fleet Failure Rate due to sustainable PM Program Compliance
LEGEND: Likelihood - (1) Unlikely
(2) Likely
Likely
(3) Very Likely
1. Better 11mproved Department Image 2. Low or reduced in maintenance expenditures from corrective and emergency maintenance 3. Optimized Resources Utilization Manpower, Materials and Tools
High
6
High
6
High
6
Benefit Rating - (1) Low
(2) Medium
1. Ensure on time submission per standard Annual Preventive Maintenance Program 2. Monitor all end users and implementing offices Annual PM Program Compliance 3. Adopt ISO 55001:2014 - "Asset Management Standard" 4. Physical Asset Management Automation 5. Procurement of the latest and most appropriate (3) High
Note: Action Plan is required for Benefit Factor::=: 4, Action Plan is required if regulatory or statutory requirement
1. Bureau Director 2. Assistant Bureau Director 3. Equipment Operation and Maintenance Division Chief 4. Floating Equipment Division Chief 5. Regional Office Equipment Management Division 6. DEO - Equipment Services Unit
Issue Date:
Department of Public Works and Highways
FEB 2 B 2017
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
g of 13
• Activity
Opportunity Event
Likelihood
(l)
Benefit (if opportunity is encountered)
Benefit Rating (BR)
Benefit Factor
Action Plan
Responsible
preventive and predictive maintenance equipment and tools
3. Local and International recognition due to PM Program Implementation
LEGEND: Likelihood - (1) Unlikely
(2) Likely
Likely
(3) Very Likely
1. Better 11m proved Department Image 2. International Standard of Excellence
High
6
High
6
Benefit Rating - (1) Low
(2) Medium
1. Ensure on time submission per standard Annual PM Program 2. Monitor all end users and implementing offices Annual PM Program Compliance 3. Adopt ISO 55001:2014 - "Asset Management Standard" 4. Physical Asset Management Automation 5. Procurement of the latest and most appropriate preventive and (3) High
Note: Action Plan is required for Benefit Factor::: 4, Action Plan is required if regulatory or statutory requirement
1. Bureau Director 2. Assistant Bureau Director 3. Equipment Operation and Maintenance Division Chief 4. Floating Equipment Division Chief 5. Regional Office Equipment Management Division 6. DEO - Equipment Services Unit
Issue Date:
Department of Public Works and Highways
FEB 2 B 2011
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
g of 13
• Activity
Opportunity Event
Likelihood (l)
Benefit (if opportunity is encountered)
Benefit Rating (BR)
Benefit Factor
Action Plan
Responsible
predictive maintenance equipment and tools
2. Disposal of obsolete/ uneconomical! unserviceable equipment
Revenue from sales of Disposable Equipment
LEGEND: Likelihood - (1) Unlikely
(2) Likely
Likely
(3) Very Likely
1. Better/Improved Department Image 2. Acquisition of new or replacement equipment 3. Low or reduced in maintenance expenditures from corrective and emergency maintenance 4. Reduced safekeeping and storage cost 5. Optimized Resources Utilization Manpower,
High
6
High
6
High
6
High
6
High
6
Benefit Rating - (1) Low
(2) Medium
1. Adopt ISO 55001:2014 - "Asset Management Standard" 2. Establish Annual Disposal Plan and Schedule
(3) High
Note: Action Plan is required for Benefit Factor::: 4, Action Plan is required if regulatory or statutory requirement
1. Central Disposal Committee 2. Bureau Director 3. Assistant Bureau Director 4. Equipment Planning Division Chief 5. Regional Disposal Committee 6. Bureau staff who are members of the Central Disposal Committee
Issue Date: Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
10 of 13
• Activity
FES 2 B 2017
Department of Public Works and Highways
Opportunity Event
Likelihood (l)
Benefit (if opportunity is encountered)
6.
LEGEND: Likelihood - (1) Unlikely
(2) Likely
(3) Very Likely
Materials and Tools Encouraged scrap business participation
Benefit Rating (BR)
Benefit Factor
High
6
Benefit Rating - (1) Low
(2) Medium
Action Plan
(3) High
Note: Action Plan is required for Benefit Factor::::4, Action Plan is required if regulatory or statutory requirement
Responsible
•
Unit: Process:
Issue Date:
Department of Public Works and Highways
FES 1 B 2011
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
11 of 13
Procurement Service I Unit Staff Procurement Management
Activity
Opportunity Event
1. Preparation of Bid Documents
Bid Documents are reviewed and finalized earlier due to early submission of Implementing Office to Procurement Service 12 days before the PPC
LEGEND: Likelihood - (1) Unlikely
(2) Likely
Likelihood (l) Likely
(3) Very Likely
Benefit (if opportunity is encountered) Prompt advertisement Expedite procurement process
Benefit Rating (BR)
Benefit Factor
High
6
Action Plan
1. Require IO's for early submission of PPMP, duly signed by Head of 10 and evaluated by Head of Budget Office, to PrS for consolidation to monitor preparation of bidding documents prior to the IO's request of PPC 2. Follow up 10 on the submission of Bidding Documents emphasizing the deadline of 12 calendar days before scheduled PPC
Benefit Rating - (1) Low (2) Medium (3) High Note: Action Plan is required for Benefit Factor::: 4, Action Plan is required if regulatory or statutory requirement
Responsible
1. Procurement Service / Unit Staff 2. Implementing Office
Issue Date:
Department of Public Works and Highways
Doc. Code:
Annex C
Quality Management System
Revision No.:
o
Opportunity Register
Page No.
12 of 13
• Activity
2. Pre- qualification and Bid Evaluation
Likelihood Opportunity Event (l) Completion of Bid Evaluation earlier than the schedule due to compliance with the existing guidelines
LEGEND: Likelihood - (1) Unlikely
(2) Likely
likely
(3) Very Likely
Benefit (if opportunity is encountered)
Benefit Rating (BR)
Benefit Factor
Probability that a bidder/applicant rated "failed" in the evaluation to submit Motion for Reconsideration will lessen, thus, duration of evaluation will be shorten
High
6
Benefit Rating - (1) Low
(2) Medium
Action Plan
Responsible
1. Proper assignment and training of TWG on the latest revisions of RA 9184, GPPB issuances/resol utions and IFI's Evaluation Guidelines. 2. BAC thoroughly review the recommendation of TWG and recommend re-evaluation if necessary
BAC/ BAC TWG/ Procurement Service
(3) High
Note: Action Plan is required for Benefit Factor ~ 4, Action Plan is required if regulatory or statutory requirement
Issue Date:
Department of Public Works and Highways
FEB 2 B 2017
Doc. Code:
Annex C
Quality Management System
Revision No.:
0
Opportunity Register
Page No.
13 of 13
• Activity
3. Performance Evaluation
Opportunity Event
Completion of Post Qualification Evaluation earlier than the schedule due to compliance with the existing guidelines
LEGEND: Likelihood - (1) Unlikely
(2) Likely
Likelihood (l) Likely
(3) Very Likely
Benefit (if opportunity is encountered) Probability that the LCS found "Postqualified" in the evaluation to submit Motion for Reconsideration will lessen, thus, recommendation of Award will be earlier
Benefit Rating (BR)
Benefit Factor
High
6
Benefit Rating - (1) Low
(2) Medium
Action Plan
Responsible
1. Proper assignment and training of TWG on the latest revisions of RA 9184, GPPS issua ncesj resol utions and IFI's Evaluation Guidelines. 2. SAC thoroughly review the recommendation of TWG and recommend re-evaluation if necessary
SACj SAC TWGj Procurement Service
(3) High
Note: Action Plan is required for Benefit Factor ~ 4, Action Plan is required if regulatory or statutory requirement