Loading documents preview...
KHILALA GAS COMPRESSION PACKAGE Doc No :
EMC-PRJ-CHK-002
Date : 03/07/2019
Doc Title :
Electrical, Instrument and Safety Check List
Rev : 0
OWNER
DISOUQ PETROLEUM COMPANY
EPC CONTRACTOR
EGYPTIAN MAINTENANCE COMPANY
PACKAGE SUPPLIER
DEEP INTERNATIONAL DMCC
PROJECT
KHILALA GAS COMPRESSION PACKAGE
Electrical, Instrument and Safety Check List
0 REV
Issue For Review DESCRIPTION
03/07/2019
ASV
AP
AP
DATE
PREPARED
CHECKED
APPROVED
KHILALA GAS COMPRESSION PACKAGE Doc No :
EMC-PRJ-CHK-002
Date : 03/07/2019
Doc Title :
Electrical, Instrument and Safety Check List
Rev : 0
1. ELECTRICAL EQUIPMENT’S CHECKLIST
Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Content Check Installation As Per P&Id And GA Drawing Witness tests when notified and record test data if desired Make insulation test of all wiring using a me ohmmeter Check lighting circuits and intensities Make insulation tests of motor windings and of alternator generator windings from phase to phase, and phase to ground using a me ohmmeter Make grounding system tests to determine continuity of connections and value of resistance to ground Check oil level of generator Check adjustments on all motor control and switchgear equipment Check switchgear and motor control center relays for proper functioning Has the Cable/Conduit been Pulled, Installed, and Terminated Have Merger Tests Been Completed for The Cables Have Transformer Oil Levels Been Checked Have Protection Relays Been Set, Adjusted, and Recorded Have Electrical Motors No-load tested and rotation verified Have Electrical Motors Been Megger Tested Has the Field PLC Been Powered and Verified Operational Has the Fire and Gas Detection Panel Been Powered and Verified Operational Has the Flare Panel Been Powered and Verified Operational Have Loop Checks Been Made Have End Devices Been Check with The Cause and Effect Chart to Verify Functionality Check local inspector’s/authority approval Check phase sequence and polarity Check bearing, winding temperatures and vibration Check installation of emergency and instrument power systems Check installation of electrical tracing system Check That It Cover All Parameter As Per QAP Check Identification Tags Check all report and certificates
Yes
No
N/A
□
□
□
□ □
□ □
□ □
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□ □
□ □
□ □
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□ □ □
□ □ □
□ □ □
□
□
□
□ □ □ □
□ □ □ □
□ □ □ □
□
□
□
KHILALA GAS COMPRESSION PACKAGE Doc No :
EMC-PRJ-CHK-002
Date : 03/07/2019
Doc Title :
Electrical, Instrument and Safety Check List
Rev : 0
2. INSTRUMENT CHECKLIST Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Content
Yes
No
N/A
Check Installation As Per P&Id And GA Drawing Check Identification Tags Check all report and certificates check pointer travels and verify instrument capability to measure, operate and stroke in the direction and manner required by the process application check Field calibrate instruments with standard test equipment check Fully pressurize and energize the transmitting and control signal system check open process connections at primary sensors and final regulators and control check Installation and connected all system components and verify their conformance with specifications and design criteria for function and range using dummy transmitted signals as needed check all transmission and control Check control circuits in accordance of QAP Check all electrical signals and alarm wiring for continuity, correct sources of power and polarity Check all electrical signals and alarm wiring for continuity, correct sources of power and polarity Check thermocouples for proper joining of wires, proper polarity and continuity of receiving instruments check inline components such as control valves, positive displacement meters, turbine meters, etc. Check bores of orifice plates Check designation and function of each isolator and fuse in electric systems Check operation of automatic transfer systems, reset mechanisms, etc. Loop checks all instrumentation from field to control room. Witness all loop checks Check all control valves, on/off valves, lubricate as required
□ □ □
□ □ □
□ □ □
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□ □
□ □
□ □
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
Test and adjust all safety devices and seals where necessary use as per QAP Check all safety devices e.g. pressure relief valves after testing
□
□
□
□
□
□
KHILALA GAS COMPRESSION PACKAGE Doc No :
EMC-PRJ-CHK-002
Date : 03/07/2019
Doc Title :
Electrical, Instrument and Safety Check List
Rev : 0
3. SAFETY INSPECTION CHECKLIST Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Content
Yes
No
N/A
Are all work place clean and in good condition Is all Installation in good/stable condition and properly adjusted Are all walking or working surfaces free of tipping/slipping hazards Are emergency phone numbers and procedures posted at or near telephones Are machine and belt guards in place and in good condition All moving parts are covered Is pedestal machinery securely anchored to the floor? Is all piping appropriately identified as to contents/direction of flow Are hot pipes and surfaces guarded against contact and clearly marked “HOT” Are exit signs posted and properly illuminated to clearly indicate exits Are electric hand tools properly grounded/insulated Is the area free of extension cords Are circuit breaker panels free of combustible materials Is emergency equipment (alarm pull boxes, eyewashes, showers, etc.) accessible and not blocked by equipment Is all emergency equipment in good condition Is good housekeeping practiced in work area (Is it free of debris, combustibles, obstructions? Are aisles maintained? Are ladders is good and safe to use Are no smoking regulations clearly posted Are all extinguishers in place and properly mounted
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□
□ □
□ □
□ □
□
□
□
□
□
□
□
□
□
□ □ □
□ □ □
□ □ □
□
□
□
□
□
□
□
□
□
□ □ □
□ □ □
□ □ □