ENGINEERING PROCEDURES MANUAL
Manual Number :DRY 01
TABLE OF CONTENT Chapter ToC RoR LEP Distribution
Chapter I
Chapter II
Chapter III
Chapter IV
Chapter V
Chapter VI
Chapter VII
Revision : ISSUE
Description Table of Content Record of Revision List of Effective Pages Distribution General Manual Case and Policy Distribution & Revision Reference Page Format Engineering Structural & Responsibility Engineering Chart Technical Services Division Staff Production Planning Control Staff Technical Publication Staff Material Planning Airworthiness Directives & Service Bulletins Background Purpose Responsibilities References Compliance AD or SB Maintenance Program Development Requirement Preparation of Aircraft Inspection and Maintenance Program Revision of Maintenance Program Computerization maintenance, component and inventory status maintenance record and control Introduction Responsibility Maintenance Record Filing Procedures Maintenance Record Preservation and Retrieval Requirements Record Keeping System Records Retention Computerized Maintenance, Component and Inventory Status Transfer Record Technical Publication General Responsibilities Technical Publication Control System Technical Publication Status Check Engineering Services General Responsibilities Date : May 10, 2019
ENGINEERING PROCEDURE MANUAL Page ii-iii iv v – vi vii 1-2 1 1 1 2 3-8 3 4 5 7 8 9-14 9 9 9 10 10 15-18 15 15 18 19-24 19 19 19 19 21 21 23 24 25-28 25 25 25 27 29-30 29 29 Halaman :
ii
TABLE OF CONTENT Chapter VII FORM DRY-100 DRY-101 DRY-102 DRY-103 DRY-104 DRY-105 DRY-106 DRY-107 DRY-108 DRY-109 DRY-110 DRY-111 DRY-112A DRY-112B DRY-113A DRY-113B DRY-114 DRY-115 DRY-117 DRY-119 DRY-120 DRY-121
Revision : ISSUE
Engineering Order Engineering Instruction Engineering Form List Manual Change Request Engineering Order Engineering Justification Engineering Instruction Job Card Work Report Daily Report Maintenance Discrepancies Report List Aircraft Monthly Report Technical Publication Status Report Inspection Sheet Task Card Weight and Balance C402B Weight and Balance BAe ATP Swing Compass Cessna 402 Swing Compass Cessna BAe ATP Aircraft Status Publication Transmittal Borescope Inspection Report Material Requesition Maintenance Log Book 402 Maintenance Log Book ATP
Date : May 10, 2019
ENGINEERING PROCEDURE MANUAL 29 29 1-2 1-3 1-3 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-4 1-4 1-4 1-4 1-2 1-2 1-2 1-2 1-3 1-3
Halaman :
iii
RECORD OF REVISON
No.
Revision No
Issued date
1
Issue
May 2019
ENGINEERING PROCEDURE MANUAL
Inserted By
2 3 4 5 6 7 8 9 10 11 12 13 14 15
Revision : ISSUE
Date : May 10, 2019
Halaman :
iv
DISTRIBUTION LIST
ENGINEERING PROCEDURE MANUAL
DISTRIBUTION LIST OF TRAINING PROCEDURE MANUAL NO 1 2 3 4 5 6 7 8 9 10
DISTRIBUTION MAINTENANCE MANAGER DGCA PRESIDENT DIRECTOR CHIEF INSPECTOR QUALITY, SAFETY AND SECURITY MANAGER
HARDCOPY NO. MASTER 01 02 03 04 05 06 07
Noted : 1. Distribution of each manual shall be registered in the Distribution List of each manual. The Engineering Procedures Manual shall be distributed to all personnel involved and responsible for Engineering Departmenty activities as the Controlled Copy. Other personnel may obtain copy of this Engineering Procedures Manual from Maintenance Manager but will not receive the revisions. “Uncontrolled Copy” stamp will be provided in the selected pages manual copy. 2. Softcopy will be uploaded on google drive with PDF format file, All technical personnel have been able to access this EPM, as is Controlled Copy Manual, if it has been downloaded it will be “uncontrolled copy”.
Revision : ISSUE
Date : May 10, 2019
Halaman :
vii
CHAPTER I GENERAL INFORMATION
ENGINEERING PROCEDURE MANUAL
1. MANUAL CASE AND POLICY The Engineering Procedure Manual (EPM) EPM is a detailed procedure for the implementation of tasks from engineering which is the technical sub division in charge, the engineering task include Implement the effectives Service Bulletin and Airworthiness Directives to the aircraft that operated by PT.DERAYA a. Develop Maintenance Program that is adopted from the manufacturing maintenance program. b. Record and control all maintenance activities, and input all record into a computerized system to maintain schedule of all maintenance activities. c. Keep all technical file, document and manual, controlling distribution all file, document and manual to other division and PT.DERAYA base. d. Issuing engineering orders if there is work to be done or can only be done by an approved maintenance organization e. Issuing engineering instruction if any service bulletin (SB) are issued by manufacture or airworthiness directives (AD) issued by local authority, analysis the method and requirement to implement SB or AD to the aircraft, Inform to technical manager and all sub ordinates if any defect and what should be done for next progress. 2. DISTRIBUTION AND REVISION Copies of this program are held by Maintenance Manager and Quality Assurance, to known and maintain all tasks are carried out as procedures that have been made and approved by Quality Assurance PT.DERAYA 3. REFERENCE 1. PT.DERAYA, COMPANY MAINTENANCE MANUAL 2. CASR, 135.380 Maintenance recording requirement 3. SI 8900-3.329 Maintenance Record System Evaluation
Revision : Issue
Date : May 10 , 2019
Halaman :
1
dari
30
CHAPTER I GENERAL INFORMATION
ENGINEERING PROCEDURE MANUAL
4. PAGE FORMAT COMPANY NAME/LOGO
MANUAL NAME
CHAPTER TITLE
CHAPTER I GENERAL INFORMATION
ENGINEERING PROCEDURE MANUAL
Revision identifier, on right side of the paragraph if any
Revision : ISSUED Revision Number
Revision : Issue
Date : April , 2019 Revision Date
Date : May 10 , 2019
Halaman :
2
dari
2
Page Number
Halaman :
2
dari
30
CHAPTER II : ENGINEERING STRUCTURE & RESPONSIBILITY
ENGINEERING PROCEDURE MANUAL
1. Engineering Chart MAINTENANCE MANAGER
3. 4.
TZ
CHIEF LINE MAINT
5.TECHNICAL SERVICES CHIEF
CHIEF WGS
C - LM
C - EP
C-WGS
6. 7.
CHIEF STORE C - STR
STAFF TECH PUBLICATION
STAFF – TECH PUB
STAFF PRODUCTION PLANING CONTROL STAFF – PPC
STAFF MATERIAL PLANING
7E
STAFF – MP
Note :
Revision : ISSUE
: subordinates : coordination
Date : may 10, 2019
Halaman :
3
dari
30
CHAPTER II : ENGINEERING STRUCTURE & RESPONSIBILITY
ENGINEERING PROCEDURE MANUAL
2. TECHNICAL SERVICES DIVISION Title : CHIEF TECHNICAL SERVICES Occupation Code : C – EP Responsible : MAINTENANCE MANAGER (TZ) A. Subordinates Staff Technical Publication Staff PPC Staff Material Planning B. Main Task The Chief Technical Division accountable to manage and to supervise of the production planning Control, technical publication and material planning activities in the company; in order to achieve the standardization of maintenance procedures and practices in accordance with the CASR and Company Maintenance Manual (CMM) rules, regulations and its standard practices. To analyze performance and improve maintenance procedures in coordination with Chief Inspector (QA). C. Job Description and Responsibility Making work planning of aircraft maintenance support annually. Making plan proposal of the technical material unit annually. Coordinating completion of economic order quantity, re-order level and service level of the material. To assist and conduct direct supervision to all personnel assigned in production planning and control. To establish the company fleet maintenance planning and monitor its implementation. Revising and evaluate MP, customize the aircraft maintenance program from manufacturer, and the latest regulations. Monitor all the updating and distribution of all manual, to the relevant sections and base operations area (outside base operation).
Revision : ISSUE
Date : may 10, 2019
Halaman :
4
dari
30
CHAPTER II : ENGINEERING STRUCTURE & RESPONSIBILITY
ENGINEERING PROCEDURE MANUAL
To develop aircraft maintenance scheduling, power plant, and its component and continually generated adjustment due to change in actual aircraft utilization and unexpected maintenance. To review and update the computer run status report and distribute them to related department and maintenance bases. To request all pre-inspection projected items for maintenance prior schedule event. To request items for modification or technical directive compliance prior to schedule event. To coordinate with maintenance for manpower scheduling at out bases as required. To prepare and distributed a report of aircraft daily status and monthly report must be ready every 5th day of current month. To maintain complete technical record in a proper correlation, including the following :
Aircraft, Engine, Propeller, Flight and Maintenance Log Book, and other related record
Inspection and repair records of aircraft, engine and component
Optional and mandatory modification records
Technical Directive Compliance records
Overhaul records
Release certificate
Accident / Incident records.
Enforce
all
general
and
departmental
safety
rules
and
regulations. Conduct the safety program as prescribe on CMM. 3. STAFF PRODUCTION, PLANING & CONTROL
Revision : ISSUE
Title
: STAFF PPC
Occupation Code
: STAFF – PPC
Responsible
: CHIEF TECHNICAL SERVICES (C – EP) Date : may 10, 2019
Halaman :
5
dari
30
CHAPTER II : ENGINEERING STRUCTURE & RESPONSIBILITY
ENGINEERING PROCEDURE MANUAL
A. Main Task The PPC staff accountable to manage and to supervise of the production planning Control activities in the company; in order to achieve the standardization of maintenance procedures and practices in accordance with the CASR and Company Maintenance Manual (CMM) and MP, regulations and its standard practices. B. Jobs Description and Responsibilities Planning annual production activity for aircraft long term maintenance activity covering hangar space plan, shop and load plan, labor calculating plan, job time frame and task time plan. Controlling availability of net work plan, and human resources and controlling aircraft inspection activity in line with Service Bulletin, Technical Instruction, and Modification Instruction. Routine controlling of scheduling and routing of the fleet in line with flight net work and route structure. Collecting production data by aircraft log books, engine log books, propeller log books and all aircraft document to improve quality and efficiency of product. Issuing Aircraft status, DMIL, Major Component Report, Job Card, Task Card routinely. Monitor the implementation of all work or inspections being or will be carried out by line maintenance, always communicate with line maintenance about the schedule, personal and administration of jobs. Monitor implementation in Line Maintenance Inspection, Main base, or outside base station, monitoring the implementation of Job Cards that have been issued by PPC.
Revision : ISSUE
Date : may 10, 2019
Halaman :
6
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER II : ENGINEERING STRUCTURE & RESPONSIBILITY 4. STAFF TECH. PUBLICATION Title
: STAFF TECHNICAL PUBLICATION
Occupation Code : STAFF – TECH.PUB Responsible
: CHIEF TECHNICAL SERVICES (C – EP)
A. Main Task The Technical Publication staff accountable to manage Technical Publication activities in the company; in order to achieve the standardization
of
maintenance
procedures
and
practices
in
accordance with the CASR and Company Maintenance Manual (CMM) rules, regulations and its standard practices. B. Jobs Description & Responsibilities Reporting and controlling the budget of Engineering Section efficiently and effectively. Maintaining a comprehensive administration system of incoming, keeping, maintenance, reproduction, distribution, service bulletin, service letter, airworthiness directive, etc. Arranging the acquisition of manuals and technical literature in sufficient amount for all maintenance bases throughout all company operational regions. Implement updating, revision and distribution of all aircraft manuals and company manuals to all departments / sections that need, including the main base and out base operations , make a listing of updates, revisions and distributions all manuals and is stored in the file, and report the update, revision and distribution to Chief Engineering and PPC. Arranging publication and distribution of engineering information, instructions to related units. Controls the aircraft manually updating all aircraft in the company, and always communicate with the vendor manually update the status of these manuals. Revision : ISSUE
Date : may 10, 2019
Halaman :
7
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER II : ENGINEERING STRUCTURE & RESPONSIBILITY
Monitor all technical manuals available in publications, and monitor all the manuals that exist in the area of operations, as well as constantly monitor the status updates manually, so that always controlled the same as in the main base. Always communicate with aircraft factory operated by the company, in order to always updating the development of aircraft, both in terms of communication service bulletins, service letters, and other information issued by the factory. 5. STAFF MATERIAL PLANING Title
: STAFF MATPLAN
Occupation Code : STAFF – MP Responsible
: CHIEF TECHNICAL SERVICES (C – EP)
A. Main Task The material planning staff is accountable to manage material and part movement in the company; in order to achieve the standardization
of
maintenance
procedures
and
practices
in
accordance with the CASR and Company Maintenance Manual (CMM) rules, regulations and its standard practices. B. Jobs Description & Responsibilities Planning and controlling major component staggering and replacing of component to achieve production hour oriented. Controlling availability of material, spare part, and tools, component and engine replacement in line with Service Bulletin, Technical Instruction, and Modification Instruction. To control the aircraft component due list, and make a report to technical manager with a limitation of minimum of 300 hrs/6 months before lead-time expires. To coordinate with aircraft maintenance and logistic department to ensure continuous flow of required material to prevent work stoppage. Revision : ISSUE
Date : may 10, 2019
Halaman :
8
dari
30
CHAPTER III : AIRWORTHINESS DIRECTIVE AND SERVICE BULLETIN
ENGINEERING PROCEDURE MANUAL
1. BACKGROUND Airworthiness Directives (AD’s) are issued by the DGCA under the provisions of CASR Part 39 when an unsafe condition exists and that condition is likely to exist or to develop in other aircraft, aircraft engines or appliances of the same type design. AD’s mandate corrective measures that must be accomplished in a specified periods of time. These corrective measures may include one-time inspections, repetitive inspections at specific intervals, prescribed repair actions or modifications which may terminate special requirements of the A.D. To operate an aircraft, engine or appliance to which an A.D. applies, except in accordance with the requirements of the directive, is to be in “noncompliance” with the CASR’s. 2. PURPOSE The purpose of this procedures are to give the guidance for Technical services personnel of scheduling and controlling of applicable Airworthiness Directives or Service Bulletin task for each Aircraft operated by PT. DERAYA that shall be performed in the effort to maintain the continuing Airworthiness of each Aircraft. 3. RESPONSIBILITIES The technical services chief shall be responsible to set-up the maintenance task and scheduling the application of applicable AD or SB for each Aircraft operate by PT. DERAYA, Engineering PPC will coordinate with the Maintenance Manager in the scheduling of the AD accomplishments required. The Material personnel will prepare material if there are material requirements. The accomplishment of AD will be supplied/submit to DGCA by Chief Inspector. If an emergency AD is issued during other than normal working hours (i.e. nights, weekends or holidays) the DGCA will be notified by Engineering / PPC and supply them with a copy of the AD. They will contact the following people. Revision : ISSUE
Date : May 10 , 2019
Halaman :
9
dari
30
CHAPTER III : AIRWORTHINESS DIRECTIVE AND SERVICE BULLETIN
ENGINEERING PROCEDURE MANUAL
A. Maintenance Manager B. The Chief Inspector C. The personnel who directly responsible for the material & store. These individuals will take whatever action is required to facilitate the accomplishment of the Emergency AD. 4. REFERENCES The AD or SB task that applicable to each type of Aircraft operated by PT.DERAYA shall be set in accordance with: Airworthiness Directives issued by the DGCA or the Authority of country of the Manufacture, or Service Bulletin issued by the Manufacture 5. COMPLIANCE AD or SB Each aircraft will have an up-to-date Airworthiness Directive Compliance Record, which will be in a form or manner that contains all of the elements of AD/SB Compliance Form. The AD Compliance summary report may be used to record either compliance of the Aircraft AD/SB or the engine AD/SB. In addition, a record system will be utilized to track Airworthiness Directives, which have a time control or repetitive compliance requirement. a. The AD Compliance Record will be kept as part of the aircraft permanent records. b. The following steps shown below illustrate the routing and review process for all incoming Airworthiness directives. The DGCA / FAA/ EASA issues the AD. The Chief Inspector and the Engineering / PPC receive and review the incoming AD for applicability and urgency and then distribute it to the concerned section for further review and implementation.
Revision : ISSUE
Date : May 10 , 2019
Halaman :
10
dari
30
CHAPTER III : AIRWORTHINESS DIRECTIVE AND SERVICE BULLETIN
ENGINEERING PROCEDURE MANUAL
Effected Department (Operations, Maintenance, etc.) will plan and route applicable AD(s) through the applicable section to obtain timely handling and accomplishment. Completed AD(s) and associated, required paperwork are reviewed then verified by Chief Inspector for accuracy and completeness. The completed of accomplishment AD report is forwarded to the Engineering Section where the data is transferred to the Airworthiness Directive Compliance Record The completed AD is then filed in the aircraft records. c. AD or SB applicable to engines will be treated the same way as the Aircraft AD/SB and the necessary record(s) shall be entered in the engine logbook by Engineering Section. An AD or SB with a time control or repetitive compliance requirement will be tracked in the same manner as an aircraft AD. d. For AD or SB applicable the chief Engineering & PPC issued Engineering Instruction (EI), completed job card and work package include inspection sheet sent to Chief Line Maintenance to perform EI acknowledge by Maintenance Manager and Chief Inspector. e. Compliance of AD or SB will be recorded in the aircraft flight maintenance log and appropriate section of aircraft or engine log books. Technical record will enter all information regarding compliance of AD or SB into a computerized system which may be printed in a form of Airworthiness Directives Compliance Summary Report and ready available for inspection if SB or AD is repetitive. For any defect found and still on limit given by manufacture Chief Engineering release EI to PPC to reschedule the maintenance Revision : ISSUE
Date : May 10 , 2019
Halaman :
11
dari
30
CHAPTER III : AIRWORTHINESS DIRECTIVE AND SERVICE BULLETIN
ENGINEERING PROCEDURE MANUAL
interval. And also sent the letter to the manufacture competed with A/C Serial Number, Time Since New, Cycle since New, and Date of work complishment For any defect found and still on limit but need the preventive action Chief Engineering release EI to Chief Line Maintenance to take action of preventive action, Acknowledge by Maintenance Manager to scheduling repairman if any repair needed. And also sent the letter to the manufacture competed with A/C Serial Number, Time Since New, Cycle since New, and Date of work accomplishment For any defect found and over the limit given by manufacture Chief Engineering follow the instruction state on SB or AD, if any replacement required, Chief Engineering send request the part and material needed to Material Planning Control to be forwarded to procurement department. The next step made a plan for replacement including prepare the material, man power, time frame for
scheduling
any
engineer
and
repairman.
After
the
accomplishment of replacement, Chief Engineering should sent the mail to the aircraft manufacture competed with A/C Serial Number, Time
Since
New,
Cycle
since
New,
and
Date
of
work
accomplishment. f. Instructions for filling out the Airworthiness Directive Compliance Record are as follows. Enter Aircraft Registration. Enter Aircraft Serial Number. Enter Aircraft model. Enter Aircraft manufacturer. Enter AD Number. Revision : ISSUE
Date : May 10 , 2019
Halaman :
12
dari
30
CHAPTER III : AIRWORTHINESS DIRECTIVE AND SERVICE BULLETIN
ENGINEERING PROCEDURE MANUAL
Enter repetitive interval (if not applicable, enter NA). Enter date of current revision, if applicable Enter date AD was accomplished. Enter Aircraft hours when AD was accomplished. Enter Aircraft cycles (landings) when AD was accomplished. Enter date AD next due. (If not applicable, enter NA) Enter aircraft hours AD next due. (if not applicable, enter NA) Enter aircraft cycles (landings) AD next due. (If not applicable, enter NA) Enter technical data used to comply with AD (i.e., SB number, manufacturer's maintenance manual reference) Enter initials of individual making entry. Initials of individual making entry.
Revision : ISSUE
Date : May 10 , 2019
Halaman :
13
dari
30
CHAPTER III : AIRWORTHINESS DIRECTIVE AND SERVICE BULLETIN
ENGINEERING PROCEDURE MANUAL
-Intentionally Left Blank-
Revision : ISSUE
Date : May 10 , 2019
Halaman :
14
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER IV : MAINTENANCE PROGRAM DEVELOPEMENT
1. REQUIREMENT Technical services chief will prepare aircraft inspection and maintenance program, in accordance with the following requirements: a. Aircraft inspection and maintenance program is complete, i.e. all inspection and maintenance related publications are incorporated. b. Aircraft inspection and maintenance program is up-to-date, the program is continuously reviewed and revised to incorporate the latest revision of aircraft maintenance manual, issue of airworthiness directive or any other approved technical data. c. Aircraft inspection and maintenance program can be implemented. 2. Preparation of Aircraft Inspection and Maintenance Program The initial step in preparing an aircraft inspection and maintenance program consists of collecting all relevant data, as listed in but not limited to the following: a. Maintenance manual (airframe, engine, propeller & component) b. Illustrated Part Catalogue (airframe, engine, propeller & component) c. Maintenance Program Document d. SB / SIL (airframe, engine, propeller & component) e. AD (airframe, engine, propeller & component). Before proceeding, it should be ensured that all relevant data is up-to-date for the latest revision status.
Revision : ISSUE
Date : May 10 , 2019
Halaman :
15
dari
30
CHAPTER IV : MAINTENANCE PROGRAM DEVELOPEMENT
ENGINEERING PROCEDURE MANUAL
The basis for the aircraft inspection and maintenance program should be the requirements prescribed in the maintenance manual of the airframe, engine, propeller and equipment manufacturer. If the airframe manufacturer recommendations differ from those of the manufacturer of the engine(s) or components, the recommendation of the airframe manufacturer shall prevail. Maintenance recommendations by service information such as service letters, service notices, service instruction etc. are not compulsory, however the Chief engineering & PPC shall review these publications and decide whether or not to include such recommendations in the aircraft maintenance program. Service information indicating a life limit (in hours, calendar time and number of cycle/landings between inspection, test and overhaul) is compulsory and shall be included in the aircraft maintenance program. The Company's Maintenance Program is a compilation of an individual maintenance and inspections.
The Maintenance Program consists of the
following elements: The applicable of the company aircraft and the current revision of Inspection Program. The company's aircraft Scheduled Maintenance and inspection Programs, Instructions and procedures for maintenance, preventive maintenance, and servicing (refer to CASR 121.133(b)). The company’s aircraft Unscheduled Maintenance Program; The company's aircraft inspection Programs for airframe and engine; Time limitations (calendar time, operational hours, flight cycles)or standards for determining time limitations for overhauls, inspections, and
Revision : ISSUE
Date : May 10 , 2019
Halaman :
16
dari
30
CHAPTER IV : MAINTENANCE PROGRAM DEVELOPEMENT
ENGINEERING PROCEDURE MANUAL
checks of airframes, engines, propellers, appliances, and emergency equipment. The company’s aircraft Required Inspection Items Program; Aircraft Instrument and Avionic bench test interval. Include the maintenance task and intervals that have been specified as mandatory in approval of the type design shall be identified as such. Procedures for aircraft refueling, elimination of fuel contamination, fire protection (including electrostatic protection), and supervision and protection of passengers during refueling (refer to CASR 121.135(c)(9)(i) and 135.135(c)(9)(i)) Instructions and procedures for maintenance personnel to follow if confronted with errors or deficiencies in documented maintenance procedures (maintenance manual, work cards, etc.), especially while performing maintenance that requires immediate corrective action to ensure safe practices and Airworthy aircraft. The procedures must include instructions for documenting the error and ensuring the deviation or corrections are validated and acceptable to the DGCA. Airworthiness inspections, including instructions covering procedures, standards, responsibilities, and authority of inspection personnel. Method & procedures for maintaining the aircraft’s weight & center of gravity within approved limits (ref to CASR 121.135(c)(8), 121.135(d)(7), 135.135(c)(8) & 135.135(d)(7)). Chief Inspector ensures that maintenance; preventive maintenance, repairs and alterations are performed in accordance with the current Maintenance Program, DGCA regulations and the other PT. DERAYA Policies and
Revision : ISSUE
Date : May 10 , 2019
Halaman :
17
dari
30
CHAPTER IV : MAINTENANCE PROGRAM DEVELOPEMENT
ENGINEERING PROCEDURE MANUAL
Procedures Manual. Chief Inspector is responsible for the enforcement and monitoring of the accomplishment of the Maintenance Program. 3. Revision of Maintenance Program Revision of manufacturer’s technical publications or issuance of service information introducing or changing of life limits (in hours, calendar time and number of cycle/landings between inspection, test and overhaul) is compulsory, and therefore the aircraft maintenance program shall be revised accordingly.
Revision : ISSUE
Date : May 10 , 2019
Halaman :
18
dari
30
CHAPTER V : MAINTENANCE RECORD AND CONTROL, COMPUTERIZED MAINTENANCE COMPONENT AND INVENTORY STATUS
ENGINEERING PROCEDURE MANUAL
1. INTRODUCTION This chapter are describes an aircraft, aircraft engine, propeller, components and qualification personnel record system used by the PT. DERAYA The record system procedure and retention enable PT. DERAYA to achieve the maximum value and utilization of its aircraft by documenting proper parts installation a routine / non routine maintenance action. The standards for determining the time limitations of overhaul, inspection, and check of airframes, engines propeller and components including emergency equipment are documented in the maintenance program. 2. Responsibility The Chief Engineering and PPC is responsible for maintaining all maintenance record in the proper manner and in accordance with the requirement of CASR. PPC and technical publication responsible to keep all the records. 3. Maintenance Record Filing Procedures. a. All record of maintenance performance of each aircraft shall be filed in a folder. b. Each folder shall have clear identification showing the following: The assigned number of the folder. Description of the document filed. The date of filing. The retention time required c. Each folder shall have to be recorded in the file Log Book for easy to retrieve and control. 4. Maintenance Record Preservation and Retrieval Requirements Deraya maintain suitable system that provides for preservation and retrieval of information
Revision : ISSUE
Date : May 10, 2019
Halaman :
19
dari
30
CHAPTER V : MAINTENANCE RECORD AND CONTROL, COMPUTERIZED MAINTENANCE COMPONENT AND INVENTORY STATUS
ENGINEERING PROCEDURE MANUAL
The following records shall be kept for the specified periods a. All the records necessary to show that all requirements for the issuance of a maintenance release under CASR Part 135 have been met. b. A description of reference to data of the work performed. c. Records of all other maintenance work that Deraya done, identifying by name and number of the licensed engineer who performed or supervised the work, and the Inspector of that work. d. Records containing the following information: The total time in service of the airframe. The total time in service of each engine and propeller. The current status of life-limited parts of each airframe, engine, propeller, and appliance. The time since last overhaul of all items installed on the aircraft which are required to be overhauled on a specified time basis. The identification of the current inspection status of the aircraft, including the time since last inspections required by the inspection program under which the aircraft and its appliance are maintained. The current status of applicable Airworthiness Directives and Service Bulletins including the date and method of compliance, and if the Airworthiness Directives or Service Bulletin involves recurring action, the time and the date when the next action is required. A list of current alterations to each Airframe, Engine, Propeller, and Appliance. Note: The “time” means calendar time, hours, or cycles as applicable. Revision : ISSUE
Date : May 10, 2019
Halaman :
20
dari
30
CHAPTER V : MAINTENANCE RECORD AND CONTROL, COMPUTERIZED MAINTENANCE COMPONENT AND INVENTORY STATUS
ENGINEERING PROCEDURE MANUAL
5. RECORD KEEPING SYSTEM A. The Record Keeping System assures that adequate and appropriate records are maintained for all work performed on PT. DERAYA aircraft. The retention of records enables the Company to maximize the value and legislation of its assets (aircraft, engines, propeller/rotor, components, appliances, etc.) by documenting proper parts installations, and routine and non-routine maintenance actions. B. The Record Keeping System classifies all records into four retention categories to improve storage and retrieval of data. These categories are: 1) Continuous - These records are continuously updated. Such record reflects to the current aircraft operations at any points in time. 2) Routine – These records may be discarded after 2 years. Except for minor check (before departure, transit check) and AML, CML station copy must be retaining for 24 (twenty four) hours. 3) Repetitive – These records must be retained for 2 (two) years after the item or group (inspection package) is accomplished again. 4) Permanent - This category includes permanent changes to the configuration of an airplane, engine, propeller/rotor, component and appliance. Such records are retained permanently. C. The Record Keeping System assures that records will be filed and stored in such a manner that the records will be readily accessible to authorized auditors and other personnel. The filling and storage system shall promote: ease of retrieval, accessibility, and adequate controls. Technical records which are maintained in the PT. DERAYAin the hard copy and/or soft copy will be secured with adequate security systems and continuous. 6. RECORDS RETENTION Company will retain the following records as follows: a. Aircraft Component Record Revision : ISSUE
Date : May 10, 2019
Halaman :
21
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER V : MAINTENANCE RECORD AND CONTROL, COMPUTERIZED MAINTENANCE COMPONENT AND INVENTORY STATUS Item to be filled JOB INSTRUCTION 1. Transit/ Pre flight/ Daily Check sheet 2. Structural Sampling Inspection 3. Airworthiness Directive 4. Aircraft Log Book 5. Engine Log Book 6. Aircraft Maintenance Log 7. Weight and Balance Report 8. Compass Swing Report 9. Major Repair/ Alteration Report form DAAO 43337 10. Test Flight Report 11. Ferry Flight Report 12. Accident/Incident Report 13. Material Airworthiness Tag 14. Work Sheet AIRCRAFT INSPECTION STATUS 1. Time in service record 2. Time in service Last Inspection 3. Schedule Last Inspection 4. Non-Schedule Last Inspection
Routine
Repetitive Permanent
X X X X X X X X X X X X X X
X
X X X
X X X
b. Engine, Propeller/Rotor, Components record Item to be filled 1.
Routine
2.
Overhaul, Check & Hot Section Insp. Inspection record Time Since Last record
3.
Time Remaining to Next Overhaul
4.
Operating time limits record
X
5.
Accumulated hours and cycles record
X
6.
Component History record
X
7.
Strip Report
X
8.
Comp. Serviceable/Airworthiness Tag
X
Repetitive Permanent X X X
X
X X
Note :
Revision : ISSUE
Date : May 10, 2019
Halaman :
22
dari
30
CHAPTER V : MAINTENANCE RECORD AND CONTROL, COMPUTERIZED MAINTENANCE COMPONENT AND INVENTORY STATUS Routine Repetitive Permanent
ENGINEERING PROCEDURE MANUAL
: Time limited records which are maintained. : For work which repeated at specific intervals. : This category includes permanent changes to the configuration of an airplane, engine, propeller/rotor, component and appliance. Such records are retained permanently.
7. COMPUTERIZED MAINTENANCE, COMPONENT AND INVENTORY STATUS. To give the guidance to the Engineering and maintenance personnel of programming, scheduling and controlling of all maintenance of each aircraft operated by Deraya that shall be performed in the effort to maintain the continuing airworthiness of each aircraft. Technical Services chief is delegated by maintenance Manager shall be responsible to setup the Computerized Maintenance, Component and Inventory status. The maintenance and component status shall be used as a reference to setup the maintenance and component program. The computerized program shall be set-up in a manner that could be easily understand and perform by the assigned personnel for application. File and document record that need computerized, consist of: a. Component Status Report. b. Schedule Maintenance. c. Technical Directives Compliance Status Maintenance Status and Component Status shall be issued monthly and any time if required. The monthly report of maintenance and Component Status shall be distributed to: a. Technical Manager b. Chief Inspector QA c. Procurement & Purchasing Manager Revision : ISSUE
Date : May 10, 2019
Halaman :
23
dari
30
CHAPTER V : MAINTENANCE RECORD AND CONTROL, COMPUTERIZED MAINTENANCE COMPONENT AND INVENTORY STATUS
ENGINEERING PROCEDURE MANUAL
d. Finance Manager e. Chief Line Maintenance 8. TRANSFER RECORDS Should the ownership of the aircraft will be change to other party, all relevant original aircraft documents and records of installed components shall be transferred to the new owner at the time of transfer of title or de registration. Should the aircraft de-registration to a foreign country, an Export Certificate of Airworthiness issued by Indonesia DGCA is required. Transfer of maintenance records will take place in two cases: a. Purchase / lease in of an aircraft In the event of purchase / lease – in, assigned person will be checked and verified on behalf of Quality Department at either the aircraft owner’s location or other agreed place before the purchase / lease will take place. b. Sale / lease out of an aircraft. In the event of sale / lease-out, Technical Service will be prepare all relevant and verified by the Inspector before the sale / lease-out will take place. The Engineering / PPC Section are responsible for the coordination of the transfer.
Revision : ISSUE
Date : May 10, 2019
Halaman :
24
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER VI : TECHNICAL PUBLICATION
1. GENERAL Technical publication in this context means all documents issued by the manufacturer of the aircraft, aircraft systems and aircraft components or by DGCA when related to technical affairs. For example, such documents are aircraft maintenance manual, flight manual, illustrated part catalogues, service bulletin, airworthiness directive, etc. It is PT. Deraya policy not to allow any person to perform maintenance, preventive maintenance and/or alterations on PT. Deraya aircraft and/or its component unless all required technical publication to support the work are available and up to date. In order to develop and maintain this situation, it must be ensured that the technical publication are at all times in good physical condition, up to date and available where and when they are required. 2. RESPONSIBILITIES a. Technical Services Chief is responsible for proper provision, control and distribution of all technical data required for company’s aircraft maintenance b. Maintenance manager is responsible to ensure that all data under his responsibility is properly maintained and utilized. All deficiencies must be reported to Technical Services & Quality Department. c. Chief Inspector is responsible to ensure that all works on company’s aircraft are performed in accordance with the approved technical data. 3. Technical Publication Control System. Due to the importance of any technical data, all incoming technical data require proper assessment. Many documents, such as revisions to existing documents may be distributed as required. It is important that the revisions
Revision : ISSUE
Date : May 10, 2019
Halaman :
25
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER VI : TECHNICAL PUBLICATION
be received at the locations where they are required without delay in order to keep all documents current. Other
documents
requiring
further
action
and
evaluation
such
as
airworthiness directives, service bulletin, service letters, shall be immediately assessed by engineering section Procedures: a. Newly received documents will be registered and introduced into the document control system. A records file will be maintained to provide adequate control of the status of all documents within the organization. b. Valid issues of the applicable documents will be available at those places where work related to the contents of the publications is carried out. Engineering section distributes the documents to those places and transmittal sheet is attached to each document forwarded with Publication Transmittal form (Form DRY-115) c. The Technical transmittal form attached last updated document, the Superseded and/or cancelled documents shall be removed from places where they are in use or to which they were issued, the removed document must be sent back to technical publication. It is the responsibility of the lead engineer or the engineer in charge of each location to ensure that the documents are kept up to date. d. Revisions shall be recorded in the relevant document and on relevant records filling system. It is the responsibility of the engineer to record the revision he had incorporated into the manual. e. Upon completion of revising the publications the engineer will fill out the transmittal sheet, publication transmittals attached to the revision and sign it off to indicate that he had incorporated and recorded the revision into the affected publications. The lead engineer or the engineer in charge is responsible to return the completed transmittal sheet to the engineering section.
Revision : ISSUE
Date : May 10, 2019
Halaman :
26
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER VI : TECHNICAL PUBLICATION
f. A periodic document revision status review will be carried out in order to check validity of all copies of documents within the organization. 4. Technical Publication Status Check All technical data kept in the technical library of PT. Deraya are maintained in an up to date status at all times. It is check for current status using information published by individual manufacturer. The information is published regularly and contain information regarding revision status of all technical issued by each manufacturer. It would be the responsibility of the chief engineering to ensure that all technical data kept in the technical library of the company are up to date where as the maintenance manager or lead engineer or engineer in charge is responsible to keep the technical data in his care in an up to date status at all time. Chief engineering will maintain a Publication Status Report FORM DRY-109 sample of such report, which contains records of technical data available at a location. The latest revision status of all technical data will be listed every any new updates of each manual
Revision : ISSUE
Date : May 10, 2019
Halaman :
27
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER VI : TECHNICAL PUBLICATION
-Intentionally Left Blank-
Revision : ISSUE
Date : May 10, 2019
Halaman :
28
dari
30
ENGINEERING PROCEDURE MANUAL
CHAPTER VII : ENGINEERING SERVICES
1. GENERAL The function of the engineering section is to assist the maintenance by preparing the aircraft maintenance program, reviewing technical data received
from
manufacturer,
controlling
technical
data
required
for
maintenance of the aircraft. Gathering maintenance data, i.e. removal and installation of components, etc. for the purpose of component reliability analysis, based on the gathered data, if necessary, issue an engineering order or engineering instruction or engineering analysis. 2. RESPONSIBILITIES Technical services staff is responsible for proper execution of the company policy related to the operation of the engineering section 3. Engineering Order Engineering Order FORM DRY-101 is a document issued by engineering section in order to provide instruction to logistic department send the component (U/S component) to AMO holders for repair or alteration or inspection. Engineering order should be written compliance and instruction for repair or alteration or inspection of component (U/S component). 4. Engineering Instruction Engineering Instruction FORM DRY-103 is a document issued by engineering section in order to provide instruction to maintenance department compliance to a technical directive (AD or SB or SIL) to be embodied on company’s aircraft. Engineering instruction should be written in such a manner to be easily understood by the person performing the work and to provide detailed information and highlights of critical work stages. Revision : Issue
Date : May 10 , 2019
Halaman :
29
dari
30
CHAPTER VII : ENGINEERING SERVICES
ENGINEERING PROCEDURE MANUAL
Prior to issuance of an engineering instruction, technical directive received from manufacture (SB or SIL) or DGCA (AD) shall be evaluated by engineering section in order to determine its applicability on company’s aircraft. Should an engineering instruction be issued for the purpose of any major repair or alteration, all supporting documents shall be submitted to and be approved by DGCA in accordance with CASR part 43 appendix B.
Revision : Issue
Date : May 10 , 2019
Halaman :
30
dari
30
Engineering Procedure Manual
DRY-01 Form DRY-100
MANUAL CHANGE REQUEST Please change the Manual Last Revision by New Revision following: NO
DESCRIPTION
CHAPTER
PAGE
REASON
Requested by :
REFF.
REMARKS
Acknowledgement
Print Name & signature
Print Name & signature Form DRY-100 (May 2019)
Revision : Issue
Date May10, 2019
Page : 1 of 1
DRY-01 Form DRY-100 Name of Form Form Number Originator Purpose
Engineering Procedure Manual
MANUAL CHANGE REQUEST DRY-100 Engineering To Request a Revision of a manual to maintenance manager
Instruction for Use Name of Field
Information Required
Responsibility
NO
Listing number of part revision
Engineering
DESCRIPTION
Description of revision
Engineering
CHAPTER
Chapter will be revised
Engineering
PAGE
Page need to be revised
Engineering
REASON
Reason of revision
Engineering
REFF.
Reference for revision
Engineering
Requested by :
Person who request the revision
PIC
Acknowledgement
Quality control chief sign for acknowledgement of revison
QC
REMARKS
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-101 ENGINEERING ORDER
PT. DERAYA ENGINEERING DEPARTEMEN JAKARTA
: : :
ATTENTION :
ENGINEERING ORDER
A.T.A. NO. DESCRIPTION MANUFACTURE MODEL / P/N. SERIAL NUMBER
NO. DATE PAGE
Engineering Procedure Manual
: : : :
REMARKS
LIST OF COMPONENTS / EQUIPMENT FITTED :
INSTRUCTION & REFERENCE
DISTRIBUTION : 1. Lembar ke-1 : ASLI 2. Lembar ke-2 : MAT.SUP.DEPT. 3. Lembar ke-3 : FILE
PREPARED BY :
CHECKED BY :
APPROVED BY :
FORM DRY-101(May 2019)
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-101 ENGINEERING ORDER
Engineering Procedure Manual
ENGINEERING ORDER USING INSTRUCTION Name of Form Form Number Originator Purpose
Engineering Order DRY-101 Engineering This form is user for to provide instruction to logistic department send the component (U/S component) to AMO holder for repair or alteration or inspection.
Date
Instruction for Use Information Required Responsibility Fill with Engineering Order Serial Number that given by MPC ex : aaa/EOMPC/bb/cccc : aaa : 3 digit Serial Number Material Plaing bb : 2 digit of Month when the EO Made cccc : 4 Digit of year when the EO Made Material Plaing Date when the EO made
Page
Page of the EO
Attention
Which department is intended
ATA Number
JASC ATA for the component that would be sent to AMO
Description
Name of the component that would be sent to AMO
Manufacture
Manufacture name of the component that would be sent to AMO
Model P/N
Manufacture name of the component that would be sent to AMO
Serial Number
Serial Number of the component that would be sent to AMO
REMARKS
Records that are copied from rottable tags, the reason why the component are removed
Name of Field
No.
Revision : Issue
Date May10, 2019
Material Plaing Material Plaing Material Plaing
Material Plaing
Material Plaing
Material Plaing
Material Plaing
Material Plaing
Page : 1 of 2
ENGINEERING ORDER USING INSTRUCTION Material Plaing
LIST OF COMPONENTS / EQUIPMENT FITTED
All component or equipment that fitted on the component that would be sent to AMO as listing
INSTRUCTION & REFERENCE
An order to the procurement department about what must be done with the component
DISTRIBUTION :
Which department who will receipt the engineering order
PREPARED BY
sign who prepared EO
CHECKED BY
sign who checked EO
Chief Engineering
APPROVED BY
sign who approved EO
Technical Manager
Revision : Issue
Date May10, 2019
Material Plaing
Material Plaing
Material Plaing
Page : 2 of 2
Form DRY-102 ENGINEERING JUSTIFICATION
Engineering Procedure Manual
ENGINEERING JUSTIFICATION A/C. Type A/C. Reg P/N / Model S/N
: : : :
Subject
:
Provided By
:
EJ No. Date TBO TSN / CSN TSO / CSO
: : : : :
Engineering Dept.
A. Background / Reason
B. References
C. Consideration
D.
Conclusion
Title Signature
: : ________________________
Approved By
:
Quality Dept.
A. General Notice B. Technical Notice
Title Signature
: : _______________________
FORM DRY-102(May 2019)
Revision : Issue
Date May10, 2019
Page : 1 of 1
Engineering Procedure Manual
Form DRY-102 ENGINEERING JUSTIFICATION ENGINEERING JUSTIFICATION USING GUIDE Name of Form Form Number Originator
Engineering Justification DRY-102 Engineering To made the justification of any condition of an component or part on aircraft still worthy to be use with some consideration and analytical that must be tested and checked
Purpose
Instruction for Use Name of Field
Information Required
Responsibility
A/C. Type
Type of aircraft where the part or component is used
Engineering
A/C. Reg
Registration name of aircraft where the part or component is used
Engineering
Fill with Engineering Justification Serial EJ No.
Number that given by Engineering EJ/[Type
of
:
A/C]/[Month]/[serial
Engineering
number]/[Year] Date
Date when the EJ made
Engineering
P/N / Model
Part number or model of the intended part
Engineering
S/N
Serial number of the intended part
Engineering
TBO
TBO of the intended part
Engineering
TSN / CSN
TSN or CSN of the intended part (by hours or by Cycle)
Engineering
Revision : Issue
Date May10, 2019
Page : 1 of 2
Engineering Procedure Manual
Form DRY-102 ENGINEERING JUSTIFICATION ENGINEERING JUSTIFICATION USING GUIDE
Instruction for Use Name of Field
Information Required
Responsibility
TSO / CSO
TSO or CSO of the intended part (by hours or by Cycle)
Engineering
Subject
Name and description of intended part
Engineering
Background / Reason
The reason of the intended part still need to be installed on aircraft
Engineering
References
Document references the intended part still can be used
Engineering
Consideration
Job or inspection that need to make sure the intended part
Engineering
Conclusion
Describe the result the intended part still worthy to be used
Engineering
General Notice
Notice from quality assurance about intended part generally
Quality Assurance
Technical Notice
Notice from quality assurance about intended part technically
Quality Assurance
Revision : Issue
Date May10, 2019
Page : 2 of 2
Form DRY-103 ENGINEERING INSTRUCTION
ENGINEERING INSTRUCTION To
:
Subject
:
Applicability
:
Reference : MFR AD MRB SB Compliance
: …………………… : ……………………
Cc :
: : : : :
Prepared by :
Engineering
Revision : Issue
No. Date
Engineering Procedure Manual
Acknowledge by :
Chief Inspector FORM DRY-103(May 2019) Date May10, 2019
Approved by:
Maint Manager
Page : 1 of 1
Form DRY-103 ENGINEERING INSTRUCTION III.
Engineering Procedure Manual
ENGINEERING INSTRUCTION Name of Form Form Number Originator Purpose
Engineering Instruction DRY-103 Engineering To made the instruction for engineer or all of sub division of maintenance to provide a special job procedure one time or repetitive
Instruction for Use Name of Field
No. Date To Cc Subject Applicability Reference Compliance Prepared by Acknowledge by Approved by
Revision : Issue
Information Required Fill with Engineering Instruction Serial Number that given by Engineering : EI/[Type of A/C]/[Month]/[serial number]/[Year] Date when the EI made Designation to the division who will carried out EI All division and/or sub division that need to know EI to prepare requirement on the EI Title of EI Object suspected must be perform the EI Acuan pengerjaan atau sumber dari EI procedures for implementing EI Signed by Someone who prepared the EI Signed by Chief Inspector for knowing the Engineering would to release EI Signed by Maintenance Manager for approving EI that made by Engineering
Date May10, 2019
Responsibility
Engineering Engineering Engineering Engineering Engineering Engineering Engineering Engineering Engineering Chief Inspector Maintenance Manager
Page : 1 of 1
Form DRY-104 JOB CARD
JOB CARD
: ……………………. NO DATE : ……………………. : ……………………. TO
ENGINEERING & PPC DEPT
REFERENCE COMPLAINT
: :
A/C. TYPE PART NUMBER DESCRIPTION SERIAL NUMBER SUBJECT
: : : : :
A/C.REG. ATA
SIGN/LAME ENGINEER
SIGN/LAME INSPECTOR
SIGN
PPC. ATTENTION
: SEND BACK TO PPC WHEN CLOSED
Revision : Issue
Date May10, 2019
Engineering Procedure Manual
: PK:
DISTRIBUTION. 1. MAINTENANCE 2. MATERIAL PLANNING 3. STORE 4. FILE FORM DRY-104
Page : 1 of 1
Form DRY-104 JOB CARD
Engineering Procedure Manual
JOB CARD USING GUIDE Name of Form Form Number Originator Purpose
JOB CARD DRY-104 Engineering To made the instruction for engineer to provide maintenance Instruction for Use
Name of Field No. Date To REFERENCE COMPLIENCE A/C TYPE A/C REG PART NUMBER ATA DESCRIPTION SERIAL NUMBER SUBJECT SIGN SIGN/LAME ENGINEER SIGN/LAME INSPECTOR DISTRIBUTION
Revision : Issue
Information Required
Responsibility
Job Card Number Date JC release Designation to the division who will carried out JC
PPC PPC
Reference to work or sources from EI Task Must be complete to closing the JC the type of aircraft where the JC will work Registration Name of aircraft where the JC will Work Part number, where work will be Carried Out JASC ATA for part would to carried out maintenance progress Description of part where work will be carried out Serial number, where work will be Carried Out Kind of job that must be carried out PPC personel Sign who prepared
PPC PPC PPC PPC PPC
Sign by engineer who carried out the job card
PPC
Sign by inspector who checked the engineer work
PPC
Fill with department who will received the original or copy file of job card
PCC
Date May10, 2019
PPC
PPC PPC PPC PPC PPC
Page : 1 of 1
Engineering Procedure Manual
Form DRY-105 WORK REPORT
PT. DERAYA MAINTENANCE DEPT.
WORK REPORT
REFER TO JOB CARD NO
:
ENGINEER
:
NO
:
DATE
:
C.A No.
:
BOOK/AMM/IPC/MEL/AOM :
INSPECTOR
NAME / SIGN / STAMP
ENGINEER
NAME / SIGN / C.A.NO. FORM DRY-105(May 2019)
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-105 WORK REPORT
Engineering Procedure Manual
V. WORK REPORT Name of Form Form Number Originator Purpose
Work Report DRY-105 Engineering to report on the results of the work that has been done based on the order State on the jobcard
Instruction for Use Name of Field No.
DATE REFER TO JOB CARD No. ENGINEER C.A No. BOOK/AMM/IPC/ME L/AOM INSPECTOR NAME / SIGN / STAMP ENGINEER NAME / SIGN / C.A. NO.
Revision : Issue
Information Required
Responsibility
Number of page work report
Engineer
Date the job has been carried out
Engineer
Number of JC that closed by Engineer
Engineer
Name of Engineer who carry out the JC
Engineer
Number of Company Authorization of the Engineer who carried out the JC
Engineer
Referances for carryout the JC
Engineer
Sign, Name, Stamp of inspector who checked the Engineer Work Report
Inspector
Sign, Name, C.A stamp of the engineer who carried out JC
Engineer
Date May10, 2019
Page : 1 of 1
Engineering Procedure Manual
Form DRY-106 DAILY REPORT
DAILY REPORT Date Place Aircraft Registration
Engineer Onboard
Daily Operation Aircraft Status
NO
DESCRIPTION
1.
Schedule Maintenance
2.
Un Schedule Maintenance
3.
Repetitive Trouble
4.
AD / SB Compliance
5.
RTA dan RTB report
6.
Delay Maintenance
7.
Defect finding Report
DESCREPANCIES
CORECTIVE ACTION
STATUS
Engineer Notice : Form DRY-106(May 2019) Prepare by,
Engineer in Charge Revision : Issue
Date May10, 2019
Page : 1 of 1
REMARKS
Form DRY-106 DAILY REPORT
Engineering Procedure Manual
DAILY REPORT USING GUIDE Name of Form
DAILY REPORT
Form Number
DRY-106
Originator
Engineering
Purpose
To report daily activity of an aircraft Instruction for Use
Name of Field
Information Required
Responsibility
Date
Date the daily report made
Engineer
Place
Base of the aircraft operation
Engineer
Aircraft Registration
Registration of aircraft
Engineer
Daily Operation
Type of aircraft operation
Engineer
Engineer Onboard
Name of engineer on board on the aircraft
Engineer
Engineer Notice
Notice from engineer about the aircraft
Engineer
Revision : Issue
Date May10, 2019
Page : 1 of 1
Engineering Procedure Manual
Form DRY-107 MAINTENANCE DISCREPANCIES REPORT LIST
MAINTENANCE DISCREPANCIES REPORT LIST A/C. TYPE : …………………………… …………………………… A/C. REG. : …………………………… ……………………………
A/C. TOTAL HRS
:
A/C. TOTAL LDG
:
ACTION NO
DATE
PART NAME
PART NUMBER
SERIAL NO.
TYPE OF DEFECT
REF. JC/TC NO.
RECTIFICATION
PERFORMED BY
FORM DRY-107 Revision : Issue
Date May10, 2019
Page : 1 of 1
INSPECTED BY
Form DRY-107 MAINTENANCE DISCREPANCIES REPORT LIST
Engineering Procedure Manual
MAINTENANCE DISCREPANCIES REPORT LIST USING GUIDE
Name of Form
MAINTENANCE DISCREPANCIES REPORT LIST
Form Number
DRY-107
Originator
Engineering
Purpose
To Collate and evaluate the maintenance discrepancies report from maintenance department Instruction for Use
Name of Field
Information Required
Responsibility
A/C Type
Type of aircraft
Engineering
A/C Reg
Registration Number of aircraft
Engineering
A/C Total HRS
Total operational hours since new
Engineering
A/C Total LDG
Total landing since new
Engineering
Date
Date of MDR
Engineering
Part Name
Name of affected part
Engineering
Part Number
Part Number of affected part
Engineering
Serial Number
Serial Number of affected part
Engineering
Type of Defect
Type of trouble affected
Engineering
Ref JC/TC no.
the number from JC / TC is being worked on when found trouble
Engineering
Rectification
Troubleshooting steps taken
Engineering
Performed By
Name of the engineer who perform the MDR
Engineering
Inspected By
Name of Inspector who checked the MDR
Engineering
Revision : Issue
Date May10, 2019
Page : 1 of 1
Engineering Procedure Manual
Form DRY-108 AIRCRAFT MONTHLY REPORT
No. …….. / IOM / DRY-PPC/……../………..
AIRCRAFT MONTHLY REPORT
( PERIOD : From No
N o
A/C. REG.
A/C. REG
DATE
A/C. TYPE
BASE
A/F. TSN
Component Replacement
A/F CSN
…………..... to …………., 200…..)
Production Hours
Production Landings
INSPECTION STATUS Last Insp Date Next Insp
NEXT MONTH COMPONENT REPLACEMENT PLAN Part Number Serial Number
PREPARED BY
CHECKED BY
PPC
PPC
A/C. Status
REMARK
Due Date
REMARK
DISTRIBUTE TO
FORM DRY-108
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-108 AIRCRAFT MONTHLY REPORT
Engineering Procedure Manual
AIRCRAFT MONTHLY REPORT USING GUIDE Name of Form
Aircraft Monthly Report
Form Number
DRY-108
Originator
Engineering
Purpose
To inform all department, aircraft usage on 1 period, last and next inspection on A/C, and component replacement plan for next periode Instruction for Use
Name of Field A/C Reg.
Information Required Aircraft Registration
Responsibility Engineering
A/C Type
Aircraft Type
Engineering
BASE
Base operation of the aircraft
Engineering
A/C TSN A/C CSN Production Hours & Production Landing
Aircraft time since new Aircraft cycle since new
Engineering Engineering
Total aircraft Hours and Landing on one periode
Engineering
Inspection Status A/C Status Remark NEXT MONTH COMPONENT REPLACEMENT PLAN Date Prepared By Checked By Distribute To
Inspection carried out on aircraft on the period and next period Status of aircraft List of component will be replace on next period Date of AMR issued Sign of engineering person who prepare the AMR Sign of chief engineering List of department who will receive the AMR
Revision : Issue
Date May10, 2019
Engineering Engineering Engineering Engineering Engineering Engineering Engineering Engineering
Page : 1 of 1
Engineering Procedure Manual
Form DRY-109 TECHNICAL PUBLICATION LIST
TECHNICAL PUBLICATION LIST LOCATION Date
: :
No. 1 2 3 4 5 … …
Publication title
Revision Status
Prepared By
Date of Revision
Format
Acknowledge By
(Technical Publication)
(Chief Engineering)
Form Deraya No. DRY-109(May 2019)
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-109 TECHNICAL PUBLICATION LIST
Engineering Procedure Manual
Name of Form
TECHNICAL PUBLICATION LIST
Form Number
DRY-109
Originator
Engineering
Purpose
To Give an information about all document and manual in a base and in the aircraft Instruction for Use
Name of Field
Information Required
Responsibility
Location
The location of manual
Technical Pub.
Date
Issued date of technical publication list revise every 6 month or any manual/document update
Technical Pub.
Publication Title
Name of Document or Manual
Technical Pub.
Revision Status
Last revision status
Technical Pub.
Date of Revision
Date of last revision of the manuals
Technical Pub.
Format
Kind of copy manual (Hard copy) or (soft Copy)
Technical Pub.
Prepared By
Sign of librarian who prepared Tech Pub. List
Technical Pub.
Acknowledge By
Sign of Chief Engineering who acknowledge the manual list on every base
Chief Engineering
Revision : Issue
Date May10, 2019
Page : 1 of 1
Engineering Procedure Manual
Form DRY-110 INSPECTION CHECK LIST [TYPE INSPECTION] INSPECTION LIST A/C REG.: No.
Date : DESCRIPTION
Revision : Issue
REFERENCE
Date May10, 2019
MECH
SIGN ENG
Page : 1 of 1
RII
Engineering Procedure Manual
Form DRY-110 INSPECTION CHECK LIST Name of Form
INSPECTION LIST
Form Number
DRY-110
Originator
ENGINEERING
Purpose
To display all inspection must be done on one of type inspection
Instruction for Use Name of Field
Information Required
Responsibility
[Type Inspection]
Kind of inspection list
Engineering
A/C REG.:
Reg Name of aircraft
Engineer
Date of Inspection
Engineer
Describe of inspection must be carried out
Engineering
Reference of Inspection
Engineering
Sign of mechanic, Engineer, and RI Inspector (if Required)
PiC
Date : DESCRIPTION REFERENCE SIGN
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-111 TASK CARD
TASK CARD TYPE
REG
AREA/ZONE
REFERENCE
INTERVAL
Engineering Procedure Manual SKILL A/P AVIONIC OTHERS
ATA Task No
-
DESCRIPTION :
DEFECT :
M
MH
Actual M
Actual MH
MECHANIC
ENGINEER
ACTION TAKEN : RII SIGN
YES NO
PART REMOVED PN :
SN :
PARTS INSTALLED PN :
SN :
DATE A/C TSN A/C CSN
DRY FORM-111 (May 2019)
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-111 TASK CARD
Engineering Procedure Manual
Name of Form
TASK CARD
Form Number
DRY-111
Originator
ENGINEERING
Purpose
To display all information of task, include job procedures
Instruction for Use Name of Field
Information Required
Responsibility
TYPE
Type of inspection
PPC
REG
Aircraft Registration
PPC
AREA/ZONE
Area/Zone of Aircraft
PPC
REFERENCE
Task References
PPC
Task Interval
PPC
ATA
ATA number of task
PPC
Task No
Number of task card
PPC
Task Description
PPC
INTERVAL
DESCRIPTION DEFECT
Finding defect of task fill if any finding
Engineer
ACTION TAKEN
Finding action taken
Engineer
PART REMOVED
Part number and Serial number removed
Engineer
PARTS INSTALLED
Part number and Serial number Installed
Engineer
M & MH Actual M & Actual MH
Man and Man Hours Required Actual Man and Man hours when the task perform
PPC Engineer
Mechanic Sign
Sign of mechanic who perform task
Mechanics
Engineer Sign
Sign of Engineer who perform task
Engineer
RII Sign Date
Sign of RII person if required
RI Inspector
Date when task perform
Engineer
A/C TSN
A/C TSN when task perform
Engineer
A/C CSN
A.C CSN when task perform
Engineer
Revision : Issue
Date May10, 2019
Page : 1 of 1
Engineering Procedure Manual
Form DRY-112A Weigh and Balance C402B Date Place Owner Expired date
: : : :
REACTION (Wheel, Jack Point) LEFT MAIN (lw) RIGHT MAIN (rw) SUB TOTAL(w) NOSE/TAIL (nw) TOTAL WEIGHT(W)
Revision : Issue
A/C. REG : A/C. S/N : A/C. Type : Weighing Type
SCALE READING (lbs)
Weight by : 1. 2. :
ITEM INCLUDED IN EMPTY WEIGHT : 1.Firex 2. First Aid Kit 3. Life Vest 4. Life Raft 5. Axe 6. ELT 7. Pilot & Copilot Seat 8. Double Sear (23.5kg) 9. Aircraft Document 10. Oxygen Bottle 11. 12.
Date May10, 2019
: : : : : : : : : :
Page : 1 of 3
Engineering Procedure Manual
Form DRY-112A Weigh and Balance C402B
Remark : 1.Aircraft weight at 2. Aircraft Fuel 3. Aircraft Hydraulic 4. Engine Oil
: Wheel Point : : :
Note : Basic Weight (s) include Unusable Fuel, Full hydraulic Fluid and Full Engine Oil. COLUMN I Item Weighed but not part of empty
Weight ( lbs )
Total
ARM ( inch )
Moment (lbs.inch )
COLUMN II Basic Items not included when weighed
Weight (lbs)
ARM ( inch )
Moment (lbs.inch )
Total
AIRCRAFT WEIGHED RECORD
=
−
× W
=
Note : D = CG Arm of Weighed N = Distance Between Reference Datum to the main wheel or wing jack point nw = Nose net Weight W = Total Weight L = Distance Between Nose & Wing jack point or Between Nose to Main Landing Gear
Revision : Issue
Date May10, 2019
Page : 2 of 3
Form DRY-112A Weigh and Balance C402B
No.
:
Date
:
Aircraft Registration
:
Aircraft Type
:
Aircraft Serial Number
:
Property of
:
Place Of Weighing
:
Reason Of Weighing
:
Weighing Equipments
:
PERFORMED BY
:
Engineering Procedure Manual
1.
Sign :
AMEL No. :
2.
Sign :
AMEL No. :
APPROVED BY : (Chief Inspector)
Sign :
RESULT WEIGHT : EMPTY WEIGHT ( BASIC ) EMPTY C.G FROM DATUM LINE
Revision : Issue
: lbs : Inch
Date May10, 2019
Page : 3 of 3
Form DRY-112A Weigh and Balance C402B
Engineering Procedure Manual
Name of Form
Weigh and Balance Cessna 402B
Form Number
DRY-112A
Originator
ENGINEERING
Purpose
To Calculate and inform the information of weigh and balance of the aircraft Instruction for Use Name of Field
Information Required
Responsibility
Date
Date when Reweighing performed
Engineer
Place
Location of reweighing
Engineer
Aircraft owner
Engineer
Expired date of weighing schedule
Engineer
Type of aircraft
Engineer
A/C SN
Serial number of aircraft
Engineer
A/C Reg
Registration code of the aircraft
Engineer
Type of weighing tool
Engineer
Person who perform reweighing
Engineer
Reading weigh on scale on every point
Engineer
List of item listed include as empty weight
Engineer
Item Weighed but not part of empty
Additional item not include at last reweighing
Engineer
Basic Items not included when weighed
List of basic item which not add on weighing
Engineer
Owner Expired date A/C Type
Weighing Type Weighing By Retraction & Scale Reading Item Included In Empty Weigh
No.
Number of reweighing
Engineering
Property of
Ownership of aircraft
Engineering
Reason of weighing
Engineering
Reason Of Weighing PERFORMED BY APPROVED BY EMPTY WEIGHT ( BASIC ) EMPTY C.G FROM DATUM LINE
Revision : Issue
Person who perform the reweighing Perform who approved reweiging
Engineer Engineer
Total empty weight
Engineering
Calculation C.G Result
Engineering
Date May10, 2019
Page : 4 of 3
Form DRY-112B Weigh and Balance BAe ATP Date Place Owner Expired date
: : : :
A/C. REG A/C. S/N A/C. Type Weight Type
: : : :
Engineering Procedure Manual
Weight by : 1. 2.
Aircraft weighed at Landing Gear
Aircraft weighed at Jack Point
L = distance between nose to main wheel or Jack D = distance from C.G Datum point to AC CG M = distance from main wheel or jack to A/C CG N = distance CG datum point to main wheel
Revision : Issue
Date May10, 2019
Page : 1 of 3
Form DRY-112B Weigh and Balance BAe ATP
REACTION (Wheel, Jack Point)
SCALEREADING (Kg)
ITEM INCLUDED IN EMPTY WEIGHT : 1. Firex 2. First Aid Kit 3. Life Vest 4. Life Raft 5. Axe 6. ELT 7. Pilot & Copilot Seat 8. Double Sear (23.5kg) 9. Aircraft Document 10. Oxygen Bottle 11. 12.
LEFT MAIN (lw) RIGHT MAIN (rw) SUB TOTAL(w) NOSE/TAIL (nw) TOTAL WEIGHT(W)
Engineering Procedure Manual
: 3Ea : 1Ea : 4Ea : :1 : 1Ea : : 1Ea : 1 SET : 2Ea
Remark : 1.Aircraft weight at 2. Aircraft Fuel 3. Aircraft Hydraulic 4. Engine Oil
: : : :
Note : Basic Weight (s) include Unusable Fuel, Full hydraulic Fluid and Full Engine Oil. COLUMN I Item Weighed but not part of empty
Weight ( kg )
ARM ( inch )
Moment (kg.inch )
Total
COLUMN II Basic Items not included when weighed
Weight ( kg )
ARM ( inch )
Moment (kg.inch )
Total
AIRCRAFT WEIGHED RECORD
=
−
( )×( × = W+ ( = ( ) − ( ) = ____________
=
Note : distance between CG datum to Trim datum = 82.3
=
× (−82.3 + ) = 10000
Revision : Issue
)
)
= ____________
×( − 10000
Date May10, 2019
)
=
Page : 2 of 3
%
Form DRY-112B Weigh and Balance BAe ATP
No.
:
Date
:
Aircraft Registration
:
Aircraft Type
:
Aircraft Serial Number
:
Property of
: PT.DERAYA
Place Of Weighing
:
Reason Of Weighing
: PERIODIC
Weighing Equipments
:
PERFORMED BY
APPROVED BY
Engineering Procedure Manual
:1.
Sign :
AMEL No. :
2.
Sign :
AMEL No. :
:
Sign :
(Chief Inspector)
RESULT WEIGHT : EMPTY WEIGHT ( BASIC ) EMPTY C.G FROM DATUM LINE INDEX
: : :
Lbs Inch
FORM DRY-112 (May 2019)
Revision : Issue
Date May10, 2019
Page : 3 of 3
Form DRY-112B Weigh and Balance BAe ATP
Engineering Procedure Manual
Name of Form
Weigh and Balance Cessna ATP
Form Number
DRY-112A
Originator
ENGINEERING
Purpose
To Calculate and inform the information of weigh and balance of the aircraft Instruction for Use Name of Field
Information Required
Responsibility
Date
Date when Reweighing performed
Engineer
Place
Location of reweighing
Engineer
Aircraft owner
Engineer
Expired date of weighing schedule
Engineer
Type of aircraft
Engineer
A/C SN
Serial number of aircraft
Engineer
A/C Reg
Registration code of the aircraft
Engineer
Type of weighing tool
Engineer
Person who perform reweighing
Engineer
Reading weigh on scale on every point
Engineer
List of item listed include as empty weight
Engineer
Item Weighed but not part of empty
Additional item not include at last reweighing
Engineer
Basic Items not included when weighed
List of basic item which not add on weighing
Engineer
Owner Expired date A/C Type
Weighing Type Weighing By Retraction & Scale Reading Item Included In Empty Weigh
No.
Number of reweighing
Engineering
Property of
Ownership of aircraft
Engineering
Reason of weighing Person who perform the reweighing
Engineering Engineer
Reason Of Weighing PERFORMED BY APPROVED BY EMPTY WEIGHT ( BASIC ) EMPTY C.G FROM DATUM LINE
Revision : Issue
Perform who approved reweiging
Engineer
Total empty weight
Engineering
Calculation C.G Result
Engineering
Date May10, 2019
Page : 4 of 3
Form DRY-113A SWING COMPASS C402 DATE : PLACE : OWNER : Expired date: REF. N.000°
A/C. REG A/C. S/N A/C. TYPE Comp. Type COMPENSATING SWING ACTUAL AIRCRAFT HEAD(T) COMPASS (1) (2) 000°
Engineering Procedure Manual
: : : :
DEVIATION (D) (1-2)
Swing by : 1. 2. RESIDUAL SWING ACTUAL HEAD AIRCRAFT (M) STEERING (C) (3) (3+(1-2)) -1°
E.090° S.180°
090° 180°
089° 179°
W.270°
270° DEV. N − DEV. S Coeff. C = = 2 DEV. E − DEV. W coeff. B = = 2
269°
REF.
ACTUAL HEAD (T) (1) 000° 030° 060° 090° 120° 150° 180° 210° 240° 270° 300° 330°
− Coeff. C =……. 2 − = Coeff. B =……. 2 STANDBYCOMPASS AIRCRAFT DEVIATION ACTUAL HEAD COMPASS (D) (M) (2) (1-2) (3) -1° 029° 059° 089° 119° 149° 179° 219° 239° 269° 299° 329°
N 030 060 090 120 150 180 210 240 270 300 330 Note : 1. Radio / avionic master ON 2. Compass Swing Procedure refer to AC43.131B CHG 1. 3. Actual Head (M) is Magnetic = True Heading minus Variation (1E) for Indonesia Compass P/N :______________ Compass S/N :______________ Master Compass P/N : SCZ – 106 Master Compass S/N : 0618-150 Calibration Date : _________ Revision : Issue
=
AIRCRAFT STEERING (C) (3+(1-2))
I hereby certify that the aircraft PK- ............ has been maintained in accordance with…...... Approved Aircraft Inspection Program and met the requirements as set forth with the Indonesia Civil Aviation Safety Regulation and it is determined to be release to service.
AMEL Sign : 1. _____________AMEL No:_________ 2. _____________AMEL No:_________
Date May10, 2019
Page : 1 of 1
Form DRY-113A SWING COMPASS C402
Engineering Procedure Manual
Name of Form
Swing Compass C402B
Form Number
DRY-113A
Originator
ENGINEERING
Purpose
To Calculate and inform the information of Compass swing of the aircraft Instruction for Use Name of Field
Information Required
Date
Date when swing compass performed
Place
Location of swing compass
Owner Expired date A/C Type
Aircraft owner Expired date of swing compass schedule Type of aircraft
A/C SN
Serial number of aircraft
A/C Reg
Registration code of the aircraft
Comp Type
Type of Swing Compass tool
Swigged By
Person who perform reweighing
COMPENSATING SWING RESIDUAL SWING STANDBY COMPASS
Deviation check for aircraft compass swing Actual Heading and steering required Actual Heading, deviation and steering required for eat 30 degree
Compass P/N
Part Number of Swing Compass Tool
Compass S/N
Serial Number of Swing Compass Tool
Calibration Date AMEL Sign
Revision : Issue
Responsibility
Last tool calibration date Sign of engineer who perform swing compass
Date May10, 2019
Page : 1 of 1
Form DRY-113B SWING COMPASS BAE ATP DATE PLACE OWNER Expired date
: : : :
A/C. REG A/C. S/N A/C. TYPE Comp. Type
Engineering Procedure Manual
: : : :
ADJUSTED BY 1. 2.
CORRECTING SWING REFERENCE
ACTUAL COURSE
AIRCRAFT COMPASS
N.000°
000°
E.090°
090°
S.180°
180°
CO – EFFICIENTS DEVIATION " "=
NOT CORRECTED
CO – EFFICIENT “C” MAKE COMPASS READ W.270°
270°
-270 NOT CORRECTED
CO – EFFICIENT “B” MAKE COMPASS READ CHECK SWING
" "= " "= " "=
DEVIATION
DEV. N − DEV. S 2
DEV. E − DEV. W 2
FOR
NW.315°
315°
315
N.000°
000°
N
NE.045°
045°
45
E. 090°
090°
E
SE.135°
135°
135
S.180°
180°
S
SW.225°
225°
225
W.270°
270°
W
STR
" "= " "=
TOTAL DEV 8
NOT CORRECTED
TOTAL DEVIATION NOTE
ENGINE :
ON/OFF
RADIO : ON/OFF
APU : ON/OFF
ENGINEER
(
APPROVED BY
)
(
LIC. No.
Revision : Issue
) QA Inspector
Date May10, 2019
Page : 1 of 1
Form DRY-113B SWING COMPASS BAE ATP
Engineering Procedure Manual
Name of Form
Swing Compass BAe ATP
Form Number
DRY-113B
Originator
ENGINEERING
Purpose
To Calculate and inform the information of Compass swing of the aircraft Instruction for Use Name of Field
Information Required
Date
Date when swing compass performed
Place
Location of swing compass
Owner Expired date A/C Type
Aircraft owner Expired date of swing compass schedule Type of aircraft
A/C SN
Serial number of aircraft
A/C Reg
Registration code of the aircraft
Comp Type
Type of Swing Compass tool
Swigged By
Person who perform reweighing
Correcting Swing SWING
Deviation check for aircraft compass swing
Compass P/N
Part Number of Swing Compass Tool
Compass S/N
Serial Number of Swing Compass Tool
Calibration Date AMEL Sign
Revision : Issue
Responsibility
Last tool calibration date Sign of engineer who perform swing compass
Date May10, 2019
Page : 1 of 1
Form DRY-114 AIRCRAFT STATUS
Engineering Procedure Manual
PRODUCTION, PLANNING AND CONTROL ______________________________________________________________________
AIRCRAFT STATUS DATE : ………. / ………. / 200….
NO
A/C. REG
TYPE
BASE
STATUS
REMARK
1 2 3 4 5 6 7 8 9 NOTE :
DISTRIBUTION : DZ, TZ, CI, LZ, MAT.PLANNING, DFS, STORE
REPORTED BY : SIGN : NAME :
FORM DRY-114 Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-114 AIRCRAFT STATUS
Engineering Procedure Manual
Name of Form
AIRCRAFT STATUS
Form Number
DRY-114
Originator
ENGINEERING
Purpose
To Inform all aircraft status to other division
Instruction for Use Name of Field Date
Information Required
Responsibility
Date of aircraft status released
PPC
Number List List of aircraft registration
PPC
Type
List of aircraft type
PPC
Base
List of location of the aircraft
PPC
Status
Status information of an aircraft
PPC
Remark
Description of the aircraft status
PPC
Note
Note from planning sub division
PPC
Distribution
List of department who will received the aircraft status
PPC
Reported By
Person who report of all aircraft status
PPC
No A/C Reg
Revision : Issue
Date May10, 2019
PPC
Page : 1 of 1
Form DRY-115 PUBLICATION TRANSMITAL
Engineering Procedure Manual
PUBLICATION TRANSMITTAL Date To
: :
Attached, please find the following publication: No.
Title
Rev.
Date
Qty.
Remark
I acknowledge that item has received in good condition and work normally; understood and incorporated, sign off and return this transmittal sheet to Engineering Department as soon as possible. Sent by:
Received by:
(……………………………………) Date:
(………………………………….) Date:
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-115 PUBLICATION TRANSMITAL
Name of Form Form Number Originator Purpose
Engineering Procedure Manual
Publication Transmittal DRY-115 Technical Publication To inform the list of manual that sending to operational base
Instruction for Use Name of Field Date
Information Required
Responsibility
Sending date of transmittal publication
Technical Publication
Destination of transmittal publication
Technical Publication
Title
Title of manual sent to operational base
Technical Publication
Rev.
Revision Number of manual
Technical Publication
Date
Revision Date of manual
Technical Publication
Qty.
Total Page of manuals
Technical Publication
Kind of manuals, and other description of manual
Technical Publication
To
Remark Sent by Received by
Revision : Issue
Sign of Technical Publication person who send the publication transmittal Sign of DERAYA’s person who receive the manuals when the manual received
Date May10, 2019
Technical Publication PiC
Page : 1 of 1
ENGINEERING PROCEDURE MANUAL
To Attention Date
DRY-01 FORM DRY-116
PT Deraya Graha Intrube 2, 1st Floor Jln. Cililitan Besar-Jakarta 13610 Telp.(021) 29373417-19 Fax. (021) 29373416 romadi@deraya .co.id
: : :
Internal Publication Receipt Confirmation If these documents have been received in good condition and or inserted in proper system please complete the section below and fax to or post \ e-mail to the following address : Technical publication Deraya E-mail Address Telp. Fax.
: : : : :
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Signature Department Contact Date Address
: : : : :
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Receipt publication : No
Document
Description
Rev
Qty
Remarks
1 2 3 4 5 6 7 8 9
ISSUED:
April 2019
REVISION No. : 00
Page : 1 of 1
ENGINEERING PROCEDURE MANUAL Name of Form Form Number Originator Purpose
DRY-01 FORM DRY-116
Internal Publication Receipt Confirmation DRY-116 Technical Publication To give the confirmation to technical publication
Instruction for Use Name of Field
Information Required
To
Department who will received the manual Person in charge from the department who will received the manuals Date the Internal Publication receipt confirmation send
Attention Date Technical publication Deraya E-mail Address Telp. Fax. Signature
Name of technical publication person who sent Internal Publication receipt confirmation Email of technical publication person who sent Internal Publication receipt confirmation Address of technical publication person who sent Internal Publication receipt confirmation Telp Number of technical publication person who sent Internal Publication receipt confirmation Fax Number of technical publication person who sent Internal Publication receipt confirmation
Responsibility Technical Publication Technical Publication Technical Publication Technical Publication Technical Publication Technical Publication Technical Publication Technical Publication
Sign of PiC who receive the manuals
Receiver
Department
Department of receiver
Receiver
Contact
Contact manual receiver
Receiver
Date manual received
Receiver
Address of receiver
Receiver
Document
Name of Document or manual
Technical Publication
Description
Description part of manuals
Technical Publication
Rev
Revision status of manuals
Technical Publication
Qty
Quantity of manual
Technical Publication
Date Address
Remarks
ISSUED:
Technical Publication
April 2019
REVISION No. : 00
Page : 1 of 1
Form DRY-117 BORESCOPE INSPECTION REPORT
Engineering Procedure Manual
BOROSCOPE INSPECTION REPORT Aircraft type Aircraft registration Engine S/N Engine Position Reason for BSI Date performed Reference
: : : : : : :
1. COMBUSTION CHAMBER LINER ASSEMBLY and SMALL EXIT DUCT [FIGURE] DESCRIPTION OF DAMAGED : 2. H.P VANE SEGMENT [FIGURE] DESCRIPTION OF DAMAGED : 3. HPT BLADES [FIGURE] DESCRIPTION OF DAMAGED : 4. H.P SHROUD SEGMENTS [FIGURE] DESCRIPTION OF DAMAGED : 5. LP IMPELER [FIGURE] DESCRIPTION OF DAMAGED : Performed by,
Revision : Issue
Inspector,
Date May10, 2019
Page : 1 of 2
Form DRY-120 MATERIAL REQUESITION
Engineering Procedure Manual
ENGINEERING DEPT.
To Copy No
: : Part Number
MATERIAL REQUESITION Description
A/C Stock Registration
Note :
Date Page Req.
: :
Remarks
Ref.
Prepared By :
( Material Planning )
Revision : Issue
Date May10, 2019
Page : 1 of 1
Form DRY-120 MATERIAL REQUESITION
Engineering Procedure Manual
Name of Form
MATERIAL REQUESITION
Form Number
DRY-120
Originator
ENGINEERING
Purpose
To Inform material requisition progress to department needed
Instruction for Use Name of Field
Information Required
Responsibility
To
Department who will received Department who will received the copied of material requisition form
PPC
Number of Material Request Release date of material requisition Page of material requisition
PPC PPC PPC
Part number of part
PPC
Name of part
PPC
Aircraft registration
PPC
Quantity available part on store
PPC
Request
Quantity Request part by engineer
PPC
Remarks
Description of availability
PPC
Reference
Reference part form IPC
PPC
Note from other department
PPC
Sign of PPC person who prepared the part requisition
PPC
Copy No Date Page Part Number Description A/C Stock
Note Prepared By
Revision : Issue
Date May10, 2019
PPC
Page : 1 of 1
PK -_____________ AIRCRAFT REG
FLIGHT & MAINTENANCE LOG CESSNA C402B
FLIGHT LOG FLT NO.
FROM
BLOCK TIME
TO
NO DATE
: …………………….. : ……………………..
PERFORMANCE LOG
FLIGHT TIME
ENG. CYCLE LDG
L/H
R/H
ENG NO.
RPM
MAP
FUEL FLOW
MAGNETTO DROP EGT/CHT
LH
RH
LH
OIL SYSTEM
RH
PRESSURE L R
TEMP L R
SAT/OAT (O C)
PRESS ALT (IN HG)
IAS (KNOT)
AMPERE METER
LH
RH LH RH AIRPLANE TOTAL HRS FORWARD TODAY TOTAL
TOTAL FUEL PLACE
Remaining LH RH
UPLIFT LH RH
: CAPT. : COPIL : F.A./FOO : ENGINEER DISTRIBUTION NO. 1 ORIGINAL (WHITE) NO. 2 COPY (RED) NO. 3 COPY (YELLOW) NO. 4 COPY (BLUE)
PRE-FLT / PDI Inspection Executed Name : …………………. Date Time Lic. No Sign
: ……………………. : …………………… : …………………… : …………………..
FORM DRY-122
ENGINE OIL L/H
HYD
No
Sign/Name
AIRPLANE TOTAL LDG
ENGINE I TOTAL HRS
ENGINE II TOTAL HRS
PROP. I TOTAL HRS
PROP. II TOTAL HRS
IDLE RPM ENG I
NEXT INSP
ENG II AT A/C HRS or CAL
DISCREPANCIES
RECTIFICATION
DESCRIPTION
DESCRIPTION
AMEL RELEASE RTS M.R
R/H
Lic no.: Sign :
Lic no.: Sign :
Lic no. : Sign :
Lic no.: Sign :
Lic no. : Sign :
Lic no.: Sign :
RII Stamp R.I.I (If Any)
Sign/Stamp
Sign/stamp
Sign/stamp
Lic no. : Sign : - ENGINEERING/PPC JKT - REMAIN IN BOOK - FLOPS JKT - BASE OPERATIONS
sign/stamp
MAINTENANCE RELEASE / MR With the following wording : I hereby certify that this Aircraft has been Maintened and Inspected in accordance with the requirement of the CASR applicable there to and is safe for flight. COMPONENT REPLACEMENT
DAILY INSPECTION Inspection Executed Name Date Time Lic No Sign
: …………………..... : …………………..... : ……………………. : .…………………… : …………………….
Lic no.:
CAPTAIN Name Date Lic. No Sign
SERIAL NO DESCRIPTION
: ………………… : ………………… : ………………… : …………………
Note : Flt log & Performance log filled by Pilot & others by Engineer Incharge
PART NO.
OFF
ON
CERTIFICATE OF RELEASE TO SERVICE : The work recorded above has been carried out in the CASR for the time being inforce and it that respect the aircraft/equipment is considered flt for release for service : A/C TSN : TTL LDG : Name : AMEL Lic : Date : Sign : Type Inspection :
Engineering Procedure Manual
Form DRY-122 FLIGHT MAINTENANCE LOG
Name of Form
AIRCRAFT FLIGHT AND MAINTENANCE LOG
Form Number
DRY-122
Originator
ENGINEERING
Purpose
To Record of aircraft movement and maintenance daily
Instruction for Use Name of Field
Information Required
Responsibility Maintenance Manager
No.
Number of AFML
Date
Date of AFML
Pilot
Number of flight per aircraft registration
Pilot
Departure location of the aircraft
Pilot
Arrival location of the aircraft
Pilot
Block Time
Time between start up the engine and shut down the engine
Pilot
Flight Time
Time between when the aircraft take off and touch down
Pilot
Count when the aircraft touch down on runway
Pilot
A period of an engine from engine start, take off, cruise, landing and shut down is one engine cycle
Pilot
Number of engine
Pilot
Total engine rotation per minute
Pilot
Flt. No. From To
LDG ENG. CYCLE ENG. No. RPM MAP Fuel Flow
Pilot Quantity of fuel flow
Pilot
EGT/CHT
Pilot
MAGNETTO DROP
Pilot
OIL SYSTEM
Pilot
SAT/OAT (O C) IAS (KNOT) PRESS ALT (IN HG)
Outside air temperature (OAT) or static air temperature (SAT) refers to the temperature of the air around an aircraft. State on SAT/OAT Indicator
Pilot
Indicated Air Speed, State on IAS Indicator
Pilot Pilot
AMPERE METER AIRPLANE TOTAL HRS AIRPLANE TOTAL LDG ENGINE I TOTAL HRS ENGINE II TOTAL HRS PROP. I TOTAL HRS PROP. II TOTAL HRS
Pilot Total hours of the aircraft accumulation from previous total hours and today flight hours Total landing of the aircraft is accumulation from previous total landing and today landing Total hours of the engine #1 is accumulation from previous total engine #1 hours and today flight hours Total hours of the engine #2 is accumulation from previous total engine #2 hours and today flight hours Total hours of the propeller #1 is accumulation from previous total propeller #1 hours and today flight hours Total hours of the propeller #2 is accumulation from previous total propeller #2 hours and today flight hours
IDLE RPM
Revision : Issue
Engineer Engineer Engineer Engineer Engineer Engineer Engineer
Date May10, 2019
Page 2 of 3
Engineering Procedure Manual
Form DRY-122 FLIGHT MAINTENANCE LOG
Instruction for Use Name of Field Next Inspection AT A/C HRS or CAL
Information Required
Responsibility
Detail due of the next routine inspection, with due date and hours
Engineer
PLACE
Engineer
FUEL
Engineer
ENGINE OIL
Engineer
HYD
Engineer
DISCREPANCIES
Discrepancies or a maintenance if any
Engineer
RECTIFICATION
Rectification of the discerpancies
Engineer
AMEL RELEASE RII Stamp
Sign of engineer who perform and/or release the trouble or inspection Sign and stamp of RII inspector who approve the inspection that perform by engineer
Engineer Engineer
CAPT.
Name of the pilot on board
Engineer
COPIL
Name of the copilot on board
Engineer
F.A./FOO
Name of F.A/FOO on board
Engineer
ENGINEER
Name of engineer on board
Engineer
DISTRIBUTION PRE-FLT / PDI Inspection Executed DAILY INSPECTION Inspection Executed COMPONENT REPLACEMENT CERTIFICATE OF RELEASE TO SERVICE
Revision : Issue
List of department that will receive the AFML Name, Date, time, Lic. No, & sign of the engineer who perform the preflight inspection Name, Date, time, Lic. No, & sign of the engineer who perform the Daily inspection Component that replace from the aircraft Sign of engineer who released the aircraft
Date May10, 2019
Engineer Engineer Engineer Engineer
Page 3 of 3
PK -_____________ AIRCRAFT REG
FLIGHT & MAINTENANCE LOG BAe ATP
FLIGHT LOG FLT NO.
FROM
BLOCK TIME
TO
NO DATE
: …………………….. : ……………………..
PERFORMANCE LOG
FLIGHT TIME
ENG. CYCLE LDG
L/H
R/H
ENG NO.
TORQUE PRESS. (%)
NP (RPM %)
NH (%)
NL (%)
ITT (O C)
FUEL FLOW (Kgs/HRS)
ENGINE I TOTAL HRS
ENGINE II TOTAL HRS
OIL TEMP (O C)
OIL PRESS (PSI)
SAT/OAT (O C)
IAS (KNOT)
PRESS. ALT (Feet)
AMPERE METER
LH
RH LH RH AIRPLANE TOTAL HRS FORWARD TODAY TOTAL
TOTAL FUEL PLACE
Remaining LH RH
UPLIFT LH RH
: CAPT. : COPIL : F.A./FOO : ENGINEER DISTRIBUTION NO. 1 ORIGINAL (WHITE) NO. 2 COPY (RED) NO. 3 COPY (YELLOW) NO. 4 COPY (BLUE)
PRE-FLT / PDI Inspection Executed Name : …………………. Date Time Lic. No Sign
: ……………………. : …………………… : …………………… : …………………..
FORM DRY-123
ENGINE OIL L/H
HYD
No
Sign/Name
AIRPLANE TOTAL LDG
PROP. I TOTAL HRS
PROP. II TOTAL HRS
START TEMP ENG I
NEXT INSP
ENG II AT A/C HRS or CAL
DISCREPANCIES
RECTIFICATION
DESCRIPTION
DESCRIPTION
AMEL RELEASE RTS M.R
R/H
Lic no.: Sign :
Lic no.: Sign :
Lic no. : Sign :
Lic no.: Sign :
Lic no. : Sign :
Lic no.: Sign :
Lic no. : Sign :
Lic no.:
RII Stamp R.I.I (If Any)
Sign/Stamp
Sign/stamp
Sign/stamp
- ENGINEERING/PPC JKT - REMAIN IN BOOK - FLOPS JKT - BASE OPERATIONS
sign/stamp
MAINTENANCE RELEASE / MR With the following wording : I hereby certify that this Aircraft has been Maintened and Inspected in accordance with the requirement of the CASR applicable there to and is safe for flight. COMPONENT REPLACEMENT
DAILY INSPECTION Inspection Executed Name Date Time Lic No Sign
: …………………..... : …………………..... : ……………………. : .…………………… : …………………….
CAPTAIN Name Date Lic. No Sign
SERIAL NO DESCRIPTION
: ………………… : ………………… : ………………… : …………………
Note : Flt log & Performance log filled by Pilot & others by Engineer Incharge
PART NO.
OFF
ON
CERTIFICATE OF RELEASE TO SERVICE : The work recorded above has been carried out in the CASR for the time being inforce and it that respect the aircraft/equipment is considered flt for release for service : A/C TSN : TTL LDG : Name : AMEL Lic : Date : Sign : Type Inspection :
Form DRY-123 FLIGHT MAINTENANCE LOG
Engineering Procedure Manual
Name of Form
AIRCRAFT FLIGHT AND MAINTENANCE LOG
Form Number
DRY-123
Originator
ENGINEERING
Purpose
To Record of aircraft movement and maintenance daily
Instruction for Use Name of Field
Information Required
Responsibility
No.
Number of AFML
Date
Date of AFML
Pilot
Number of flight per aircraft registration
Pilot
Departure location of the aircraft
Pilot
Arrival location of the aircraft
Pilot
Block Time
Time between start up the engine and shut down the engine
Pilot
Flight Time
Time between when the aircraft take off and touch down
Pilot
Count when the aircraft touch down on runway
Pilot
A period of an engine from engine start, take off, cruise, landing and shut down is one engine cycle
Pilot
Number of engine
Pilot
Flt. No. From To
LDG ENG. CYCLE ENG. No.
Maintenance Manager
Torque Pressure NP NH NL ITT FUEL FLOW
Quantity of fuel flow
OIL TIME OIL PRESS Outside air temperature (OAT) or static air temperature (SAT) refers to the temperature of the air around an aircraft. State on SAT/OAT Indicator
SAT/OAT IAS
Indicated Air Speed, State on IAS Indicator
PRESSURE ALTITUDE AMPERE METER AIRPLANE TOTAL HRS AIRPLANE TOTAL LDG ENGINE I TOTAL HRS ENGINE II TOTAL HRS PROP. I TOTAL HRS PROP. II TOTAL HRS
Total hours of the aircraft accumulation from previous total hours and today flight hours Total landing of the aircraft is accumulation from previous total landing and today landing Total hours of the engine #1 is accumulation from previous total engine #1 hours and today flight hours Total hours of the engine #2 is accumulation from previous total engine #2 hours and today flight hours Total hours of the propeller #1 is accumulation from previous total propeller #1 hours and today flight hours Total hours of the propeller #2 is accumulation from previous total propeller #2 hours and today flight hours
IDLE RPM
Engineer Engineer Engineer Engineer Engineer Engineer
Next Inspection AT A/C HRS or CAL
ISSUED:
Engineer
April 2019
Detail due of the next routine inspection, with due date and hours
REVISION No. : 00
Engineer
Page : 1 of 3
Instruction for Use Name of Field
Information Required
Responsibility
PLACE
Engineer
FUEL
Engineer
ENGINE OIL
Engineer
HYD
Engineer
DISCREPANCIES
Discrepancies or a maintenance if any
Engineer
RECTIFICATION
Rectification of the discerpancies
Engineer
AMEL RELEASE RII Stamp
Sign of engineer who perform and/or release the trouble or inspection Sign and stamp of RII inspector who approve the inspection that perform by engineer
Engineer Engineer
CAPT.
Name of the pilot on board
Engineer
COPIL
Name of the copilot on board
Engineer
F.A./FOO
Name of F.A/FOO on board
Engineer
ENGINEER
Name of engineer on board
Engineer
DISTRIBUTION PRE-FLT / PDI Inspection Executed DAILY INSPECTION Inspection Executed COMPONENT REPLACEMENT CERTIFICATE OF RELEASE TO SERVICE
Revision : Issue
List of department that will receive the AFML Name, Date, time, Lic. No, & sign of the engineer who perform the preflight inspection Name, Date, time, Lic. No, & sign of the engineer who perform the Daily inspection Component that replace from the aircraft Sign of engineer who released the aircraft
Date May10, 2019
Engineer Engineer Engineer Engineer
Page 3 of 3