Creation and maintaining a Web based Protection Database and Desktop based Protection setting calculation tool for Eastern Regional Grid
Eastern Regional Power Committee 14 Golf Club Road, Tollygunge, Kolkata, West Bengal 700033
OPERATIONAL LOAD FLOW STUDIES UNDER SUMMER PEAK LOADING CONDITIONS September 2017
Power Research and Development Consultants Private Limited # 5, 11th cross, 2nd stage, west of chord road, Bangalore - 560 086, Karnataka Tel: +91- 80-23192159 / 23192168 E-mail –
[email protected] Web site: www.prdcinfotech.com
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Document reference details: LOA No
: ERPC/PR_DBASE/2016/3567
Document reference No : PRDC/2017-2018/ERPC-WB/937 Revision Index Revision
Description
Date
Remarks
1.0
Summer-Peak Load Flow Report
19.09.2017
Initial version
1.1
Modification
20.09.2017
Based on the comments given by Mrs. Debarati Basu
2.0
Approved
20.09.2017
Approved
Internal Approval Ms. Suman Kumari Prepared by
19.09.2017 Mr. Anirban Banerjee
Reviewed by
Mrs. Debarati Basu
20.09.2017
Approved by
Dr. Nagaraja Ramappa
20.09.2017
2
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
TABLE OF CONTENTS 1
INTRODUCTION ...................................................................................................................... 12
2
PROJECT SCOPE ................................................................................................................... 13 2.1
3
Database Building Activities for Operational Studies ...................................................... 14
SYSTEM OPERATIONAL DATA............................................................................................. 15 3.1
Methodology adopted for performing the load flow analysis ........................................... 17
3.1.1
Data Collection Procedure .......................................................................................... 17
3.2
May 04, 2017 Peak system demand condition ................................................................ 19
3.3
Salient points of CEA planning criteria referred for network modelling and analysis of
study results .................................................................................................................................. 19 3.3.1 3.4
Transformer parameters .................................................................................................. 21
3.4.1 3.5
5
3.5.1
Substation details ....................................................................................................... 21
3.5.2
Transmission line details ............................................................................................ 22
3.5.3
Transformer details ..................................................................................................... 22
3.5.4
Generation details....................................................................................................... 23
3.5.5
HVDC details .............................................................................................................. 23
3.5.6
Reactor details ............................................................................................................ 24
3.5.7
Load details ................................................................................................................ 24 Generation schedule details for operational load flow ..................................................... 24
OPERATIONAL LOAD FLOW STUDY ................................................................................... 27 4.1
Introduction to Load flow analysis .................................................................................... 27
4.2
Load Generation Balance from the results of operational load flow analysis .................. 29
4.3
Line loading conditions .................................................................................................... 33
4.4
Transformer loading conditions........................................................................................ 35
4.5
Voltage profile .................................................................................................................. 38
4.6
Analysis of the load flow study results ............................................................................. 43
SHORT CIRCUIT STUDIES ..................................................................................................... 44 5.1
6
Voltage limits .............................................................................................................. 21 Network element statistics for ER Grid ............................................................................ 21
3.6 4
Transmission line parameters .................................................................................... 19
Short circuit study result analysis..................................................................................... 45
CONCLUSION .......................................................................................................................... 47
3
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
LIST OF FIGURES
Figure 3.1: Constituents of Eastern Regional grid ........................................................................... 16 Figure 3.2: Scheduled generation, Import and Export of Eastern Regional grid ............................. 26 Figure 4.1: Block diagram of load generation balance of ER ........................................................... 32
4
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
LIST OF TABLES
Table 3.1: Data availability status .................................................................................................... 17 Table 3.2: ER loading details ........................................................................................................... 19 Table 3.3: Source of the data considered for the study ................................................................... 19 Table 3.4: Details of transmission line parameters .......................................................................... 20 Table 3.5: Details of transformer parameters................................................................................... 21 Table 3.6: Voltage limits at different voltage levels prescribed in CEA’s “Transmission ................. 21 Planning Criteria” .............................................................................................................................. 21 Table 3.7: Existing number of sub-station in the ER ........................................................................ 21 Table 3.8: Summary of transmission line data in the ER ................................................................. 22 Table 3.9: Summary of transformers capacity in the ER ................................................................. 22 Table 3.10: Summary of Generator installed capacity in the ER ..................................................... 23 Table 3.11: HVDC Back to Back in the ER ...................................................................................... 23 Table 3.12: HVDC Link in the ER ..................................................................................................... 23 Table 3.13: Load Details of ER ........................................................................................................ 24 Table 3.14: Generation schedule Details of ER ............................................................................... 24 Table 4.1: Load generation balance Details of ER........................................................................... 29 Table 4.2: Load generation balance details of Bihar ........................................................................ 29 Table 4.3: Load generation balance details of Jharkhand ............................................................... 29 Table 4.4: Load generation balance details of Odisha ..................................................................... 30 Table 4.5: Load generation balance details of Sikkim ..................................................................... 30 Table 4.6: Load generation balance details of West Bengal ............................................................ 30 Table 4.7: Load generation balance details of DVC ........................................................................ 31 Table 4.8: Load generation balance details of CESC ...................................................................... 31 Table 4.9: Load generation balance details of DPL ......................................................................... 31 Table 4.10: Percentage loading details of lines of Eastern Region ................................................. 33 Table 4.11: Percentage loading details of lines of Bihar .................................................................. 33 Table 4.12: Percentage loading details of lines of Jharkhand ......................................................... 33 Table 4.13: Percentage loading details of lines of Odisha ............................................................... 34 Table 4.14: Percentage loading details of lines of Sikkim ................................................................ 34 Table 4.15: Percentage loading details of lines of West Bengal ...................................................... 34 Table 4.16: Percentage loading details of lines of DVC ................................................................... 34 Table 4.17: Percentage loading details of lines of CESC ................................................................ 35 Table 4.18: Percentage loading details of lines of DPL ................................................................... 35 Table 4.19: Percentage loading details of Transformers of Eastern Region ................................... 35 Table 4.20: Percentage loading details of Transformers of Bihar .................................................... 36 Table 4.21: Percentage loading details of Transformers of Jharkhand ........................................... 36 Table 4.22: Percentage loading details of Transformers of Odisha ................................................. 36 Table 4.23: Percentage loading details of Transformers of Sikkim.................................................. 36
5
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table 4.24: Percentage loading details of Transformers of West Bengal ........................................ 37 Table 4.25: Percentage loading details of Transformers of DVC ..................................................... 37 Table 4.26: Percentage loading details of Transformers of CESC .................................................. 37 Table 4.27: Percentage loading details of Transformers of DPL ..................................................... 37 Table 4.28: Bus Voltage Profile for Eastern Region ........................................................................ 38 Table 4.29: 765 kV and 400 kV Bus Voltage of Eastern Region grid .............................................. 39 Table 5.1: 3-Ph fault levels > 80% of breaker rating ........................................................................ 45 Table 5.2: SLG fault levels > 80% of breaker rating ........................................................................ 45
6
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
EXECUTIVE SUMMARY ERPC secretariat has taken up a project of “Creation and maintaining a Web based Protection Database and a Desktop based Protection Setting Calculation Tool for Eastern Regional Grid”. M/s PRDC has been awarded with the order by ERPC to implement the project in its entirety including creation of database and supply of software and hardware along with necessary power system analysis relevant for the project. Eastern Regional Grid comprises of the electrical system of the states of Bihar, Jharkhand, West Bengal, Odisha, Sikkim under different transmission utilities. The major constituents of ER grid are the Transmission and Distribution Utilities of States and UT, Central Transmission Utility, State and Central sector Generating Companies, DVC, CESC, DPL, IPP’s and Private sector Transmission and Distribution Utilities. The ER covers a geographical area of 425432 sq km with an installed capacity of 37871 MW. In addition to this the region has an installed capacity of 7840 MW in the form of CPP’s. Eastern Regional Power Committee (ERPC) formed by Ministry of Power is entrusted for facilitating the integrated operation of the power system in the region. As a prerequisite of building the protection management system the first step as envisaged is the electrical modeling of the entire network data under ER system from 765 kV to 132 kV and 66 kV for Sikkim and carrying out the base case operational load flow analysis and short circuit studies for peak and off peak load conditions. The Load flow and Short Circuit studies of Eastern Grid was carried out for summer peak 2016, summer off peak 2016, winter off peak 2016 and summer peak 2017 loading conditions of ER. The network was updated till 31st May 2016, 31st August 2016, 31st December 2016 and 30th April 2017 for summer peak 2016, summer off peak 2016, winter off peak 2016 and summer peak 2017 loading condition respectively and report was submitted with study results on 27th July 2016 for summer peak loading, 6th January 2017 for summer off peak loading and 3rd April 2017 for winter off peak loading and 21st September 2017 for summer peak case. As a next phase of the power system studies, the summer peak scenario of ER grid is studied for Load flow and Short Circuit analysis. The data and electrical parameters of the EHV network elements as updated till 30th April 2017 by collecting data from the respective constituents of ER grid and updated network is modeled in power system analysis software MiP-PSCT.
7
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
It was decided in the 132th OCC meeting that the operational Load Flow study for ER grid is carried out for a load generation condition during summer peak condition on an updated network data till April 2017. The load generation condition was selected for two time steps are collected for 4th & 5th May 2017 at 19:00 hours and 20:00 hours respectively. In 133rd OCC meeting, it was decided that the summer peak load flow study will be carried out with load generation scenario of 4th May 2017 at 20:00 hrs as per the load generation scenario data given by ERLDC. A comparison of loading details of 26th May 2016 peak hours, 27th August 2016 off peak hours, 29th December 2106 off peak hours and 4th May 2017 peak hours of ER grid is presented below. Load (MW) Sl. No.
Constituents
1 2
th
th
th
th
Bihar Jharkhand
4 May-17, 20:00 hrs 3362 1014
29 Dec-16, 02:00 hrs 2321 914
27 Aug-16, 13:00 hrs 2716 799
26 May-16, 20:00 hrs 3044 991
3 4
Odisha Sikkim
3666 57
2236 36
2872 43
3354 75
5
W. Bengal
5854
3176
4858
5460
6 7
DVC CESC
2494.5 1675.8
2330 558
2426 1507
2621 1441
DPL Total Load
231 18354
181 11753
217 15438
217 17203
loss Total Demand
749 19103
389 12142
671 16109
762 17965
8
Load flow analysis and short circuit studies are conducted under summer peak loading scenario and the observations on the results are detailed in subsequent sections of the report. Constituent’s wise demand for ER grid id presented below.
8
Sl. No.
Constituents
Demand MW)
1
Bihar
3362
2
Jharkhand
1014
3
Odisha
3666
4
Sikkim
57
5
W. Bengal
5854
6
DVC
2495
7
CESC
1676
8
DPL
231
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Summarized particulars of network data for ER as on 30st April 2017 collected during the studies are given below: EHV Transmission Grid Substations: The total count is 501 with a voltage grade wise population mix as, o
765 kV: Number of substations is 5 with installed capacity of 18000 MVA
o
400 kV: Number of substation is 47 with an installed capacity of 36390 MVA
o
220 kV: Number of substation is 105 with an installed capacity of 39140 MVA
o
132 kV: Number of substation is 348 with an installed capacity of 38254 MVA
o
66 kV: Number of substation is 19 with an installed capacity of 213 MVA
ER generating units under state, central sector and integrated utilities: Aggregated generation capacity of 28403 MW with a hydro thermal mix of 5.5 : 22.8.The break up is given as, o
Total number of hydro generating units is 91 with an installed capacity of 5598 MW
o
Total number of thermal generating units is 105 with an installed capacity of 22805 MW
ER generating units under IPPs: Aggregated generation capacity of 9468 MW with a hydro thermal mix of 2.06: 92.62.The break up is given as, o
Total no. of hydro generating units is 4 with an installed capacity of 206 MW
o
Total number of thermal generating units 31 with an installed capacity of 9262 MW
CPP generation capacity: 7840 MW. ER EHV and HV Transmission Lines (132 kV and above and 66 kV in Sikkim): 85144 ckm The node wise load and generation data, recorded are collected from the respective system owners and are matched with the demand, generation and exchange recorded by ERLDC, SCADA for the selected time instant. The consolidated observations from load flow analysis are: Load Generation Balance Peak Scenario:
9
o
System input ( Generation & Import ): 25390 MW
o
System Demand including losses in ER network : 19103 MW
o
Consolidated Export from ER bus : 6287 MW
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Generation Scheduling: Generators are scheduled as per SCADA records of ERLDC. Voltage Profile: Bus bar voltages at all voltage levels are within the stipulated range of grid code of CEA Transformer loading: In the entire population overloading of 1 transformer is observed. 76 number of transformers are loaded beyond 80% and 265 numbers are loaded below 20%. Line loading: Number of lines loaded beyond 100% of thermal capacity is 8 in 220 kV and 132 kV voltage level. Number of lines loaded between 80 to 100% of thermal capacity is 49 predominantly in 220 kV and 132 kV level. Number of lines loaded below 5% thermal capacity is 126 and the percentage is predominant at 132 kV level. Short Circuit studies are conducted on the network topology and generation scheduling of the load flow modeling for both three phase symmetrical faults and single line to ground fault conditions at every bus up to 66 kV level by considering sub transient reactance’s of the generators and closed bus operation at all 765, 400 and 220 kV bus. It is observed that short circuit levels are critical at some of the substations but within the breaker rated capacity. Detailed analysis of data and study results under summer peak condition for load flow and short circuit studies are elaborated in subsequent sections of the report.
10
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
ABBREVIATIONS AND ACRONYMS Acronym CEA CGP/CPP
Captive generating plant
CTU
Central Transmission Utility
DB DPR
Data Base Detailed Project Report
DTR
Distribution Transformer
EHV
Extra High Voltage
ER ERLDC ERPC
Eastern Region Eastern Regional Load Dispatch Centre Eastern Regional Power Committee
GoI
Government of India
GS
Generating Station
GUI
Graphical User interface
HV
High Voltage
IPP
Independent Power Producer
MiP-PSCT NR PRDC PSS SCADA SLD SLDC SS STU
11
Full form Central Electricity Authority
PRDC Bangalore
Protection Setting Calculation Tool Northern region Power Research & Development Consultants Pvt. Ltd. Power System Study Supervisory control and data acquisition Single Line Diagram State Load Dispatch Centre Substation State Transmission Utility
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
1 INTRODUCTION Eastern Regional Grid comprises of the electrical transmission system of the states of Bihar, Jharkhand, West Bengal, Odisha, Sikkim and supply area under DVC. The major constituents of ER grid are the State/UT Transmission and Distribution Utilities, Central Transmission Utility, State and Central sector Generating Companies, DVC, CESC, DPL, IPP’s and Private sector Transmission and Distribution Utilities. The ER covers a geographical area of 425,432 sq. km which is about 13% of the total area of the country with an installed capacity of 37871 MW. Keeping in view the criticality of safe and reliable operation of this vast and complex system of ER, M/s. ERPC has awarded the project for implementation of a software based protection management system that includes building up a comprehensive web based protection database for the ER grid to M/s PRDC, a pioneer consultant in the field of power engineering on 31st March 2016. As a fundamental prerequisite of building the protection management system and as base work for protection system simulation and studies the entire existing network data under ER system is modeled from 765 kV level to 33 kV buses of 132/33 kV substations for all states other than Sikkim where the network is modeled up to 11 kV buses of 66/11 kV substations. The network model in its entirety encompasses each of the individual power system elements including generators (hydro, thermal, pump storage), substations/switching station equipment, transmission lines, HVDC system, reactors, capacitors and load. This report presents the results of the base case load flow studies for the modeled EHV transmission network of the ER grid for a selected scenario of summer peak load condition. With reference to the discussions with M/s ERPC and its constituents, 4th May 2017 is identified as a typical day with evening peak load at 20:00 hours. The load flow analysis is carried out with the load generation scenario for the selected instant and the parameters are crosschecked with the SCADA results to authenticate the correctness of the modeling. Between the two selected time step, ER network is modeled for 4th May 2017 20:00 hours, wherein a demand recorded 19103 MW for the ER grid. This volume of the report presents the details of existing Eastern region transmission network data, load generation balance along with operational load flow and short circuit study results under summer peak scenario.
12
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
2 PROJECT SCOPE The scope of work envisaged in tender document is elaborated in detailed here. As per scope M/s PRDC should supply Protection Analysis Software Package with following requirements but not limited to the following modules for the supply of Software and Database building activities, M/s PRDC should develop and maintain a hardware setup and software package capable of meeting the following objectives; but not limited to: Classified database of all bay equipment and the protection system details of all bays 132 kV and above, for Eastern Regional power system. A user friendly interface for browsing and editing the contents of the database. Tool for simulating the performance/ behavior of the protection system under all possible normal and abnormal operating conditions of the power system, including effect of changing one or more parameter setting of the relays. Diagnostics for verifying proper coordination among various protective relays. Generation of useful reports. The detailed scope of work is elaborated in Volume-1 of the DPR and submitted on 27.04.2016. A consolidated view on Network Modeling and database building activity for operational load flow involve “Creation and maintaining a Web based Protection Database and Desktop based Protection setting calculation tool for Eastern Regional Grid” is presented below.
13
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
2.1 Database Building Activities for Operational Studies One time power system network model building for the Load flow, Short circuit and dynamic simulations of entire Eastern region with Indian national grid transmission network model. Data collected from respective substations to be validated before populating the same in the database. Complete modeling of ER transmission network for 132 kV and above including HVDC systems connected with ER, with relevant system parameters of transmission lines, generators, transformers, reactors for all existing substations. However, for Sikkim 66 kV system along with 66 kV interconnections are to be considered. Prepared network is made ready for base case load flow analysis and the same has to be verified with field engineers of ER constituents. Both MW and MVAr flow are computed and Voltage Level at different Buses is ascertained along with suggestive conditions to reduce or enhance Bus voltage. Short circuit, studies to be simulated and the results to be demonstrated to the ER constituents for approval. This report includes operational load flow and short circuit study of existing ER grid under summer peak loading condition.
14
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
3 SYSTEM OPERATIONAL DATA As increasing electricity demand, electrical transmission and distribution system is expanding at very fast pace. To meet future expected demand with reliable manner there is a need of great integration among electricity generating, transmission and distribution agencies. With an objective to facilitate integrated operation of power system in Eastern Region, Govt. of India had established Eastern Regional Power Committee comprising the states of Bihar, Jharkhand, Orissa, West Bengal and Sikkim along with area under DVC. The major constituents of ER grid are the State/UT Transmission and Distribution Utilities, Central Transmission Utility, State and Central sector Generating Companies, DVC, CESC, DPL, IPP’s and Private sector Transmission and Distribution Utilities. Figure 3.1 depicts constituents of Eastern Regional grid.
15
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Figure 3.1: Constituents of Eastern Regional grid
16
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
3.1 Methodology adopted for performing the load flow analysis 3.1.1 Data Collection Procedure In 132th OCC meeting, it was decided that operational load flow study under summer peak loading scenario will be carried out for load conditions of 04.05.2017 and 05.05.2017 at 19.00 hrs and 20.00 hrs respectively. To collect the Eastern grid network data for operational load flow under peak scenario a standard data collection format was prepared and forwarded to ERPC. Load generation data collection format was finalized by M/s PRDC and uploaded in ERPC portal. M/s PRDC has received the network data from most of the constituents in agreed format and remaining is collected from field survey in coordination with ERLDC and SLDC’s. Network data for all the utilities under Eastern region were collected in co-ordination with ERPC and its constituents. The complete Eastern Region Network from 765 kV level to 33 kV buses of 132/33 kV S/S (with the exception where generator is connected to a lower voltage network) is considered in the studies. However, for Sikkim 66 kV system along with 66 kV interconnections are considered. Inter-regional 765 kV, 400 kV, 220 kV and 132 kV transmission lines with Northern, Western, Southern and North-Eastern region is also considered in the studies. Network update of ER constituent has been done based on monthly report of CEA and OCC meeting and verified with the data received from concerned utilities. Table 3.1 present the collected/received data status from ERPC and its constituents. Table 3.1: Data availability status State wise Data received* Constituent of ERPC Load data (%)
Network augmentation Data (%)
Bihar
91
0
Jharkhand
74
0
Odisha
62
0
Sikkim
8
0
West Bengal
91
0
Note: Network data includes CTU and STU network details as per state wise location while DVC network details are allocated in Jharkhand and West Bengal as per physical location.
17
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC *Utility owners have furnished network data for all elements but the line and transformer parameter data is furnished for 70% elements. * SCADA record of 765 & 400 and 220kV line flow and Generation schedule from ERLDC is collected.
The methodology adopted by the study team for performing the load flow analysis is as given below. Configuring the entire Eastern Regional Grid electrical network down to 33 kV (up to 11 kV bus of 66/11 kV S/S in Sikkim) banks of the transmission substations. i.e. transmission system comprising of 765 kV, 400 kV, 220 kV and 132 kV (66 kV S/S in Sikkim) substation buses up to the 33 kV buses at the substations. Represented the collective load of the substations at 33 kV buses for Bihar, Jharkhand, Odisha and West Bengal and at 11 kV buses in Sikkim. Import form generation located outside the region is considered as a bulk import. Railway loads are modeled by considering radially link with grid. Slack bus is considered outside the region at the point having a maximum power exchange from eastern grid. Generation scheduling is matched with ERLDC’s SCADA record. Allocation of load to the substations is finally done to match the state wise system demand as per ERLDC’s SCADA record. Simulation of load flow analysis under peak scenario is done on the integrated Grid transmission network of Eastern Region. Geographical drawings for entire Eastern Regional Grid transmission network along with separate maps of eastern grid constituent states. Eastern regional transmission network is simulated under summer peak scenario by taking load demand of 04.05.2017 at 20.00 hrs. Currently, the modeled Eastern grid network has been simulated for the loading conditions which are given in Table 3.2.
18
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC Table 3.2: ER loading details h
Date & Time
4 May 2017, 20:00 hrs.
System Demand Met
19103 MW
Total Load
18354 MW
System Loss
749 MW
Percentage Loss
2.95%
Software used : MiP-PSCT
3.2 May 04, 2017 Peak system demand condition The study team has received substation wise load data and SCADA records from the ERLDC and SLDC’s of eastern region. The data considered for modeling the transmission network and its sources are given in Table 3.3. Table 3.3: Source of the data considered for the study Sl No
Data
Source
1
Transformers
Field data and CEA planning criteria
Field data and network data received from CTU, STU and other constituents Data received from CTU, STU and other 3 Lines / UG cable parameters constituents and CEA planning criteria SCADA recordings and Load data received 4 Loads and Generation from SLDC’s Note: Transmission lines and Transformers parameters, which are not furnished by CTU’s and 2
Transmission lines / UG cable types
STU’s, is considered as per CEA transmissions planning criteria.
This section of the report presents the basic data considered for the system studies.
3.3 Salient points of CEA planning criteria referred for network modelling and analysis of study results 3.3.1 Transmission line parameters Table 3.4 provides the transmission line parameters and the thermal loading limit of the transmission lines at various voltage levels considered for the studies.
19
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table 3.4: Details of transmission line parameters
Voltage (kV)
Positive Sequence Resistance (ohm/km/ckt)
Positive Sequence Reactance (ohm/km/ckt)
Positive Sequence Susceptance , B/2 (mho/km/ckt)
Zero Sequence Resistance (ohm/km/ckt)
Zero Sequence Reactance (ohm/km/ckt)
Zero Sequence Susceptance , B/2 (mho/km/ckt)
Thermal Rating (MVA)
ACSR Quad Bersimis
765
0.0114
0.2856
2.01E-06
0.2634
1.0534
1.20E-06
3880
ACSR Hexa Zebra
765
0.0123
0.2552
2.27E-06
0.2247
0.9223
1.38E-06
4452
ACSR Quad Moose
400
0.0147
0.2528
2.29E-06
0.2480
1.0000
1.32E-06
1749
ACSR Twin Moose
400
0.0298
0.3320
1.73E-06
0.1619
1.2400
1.12E-06
874
AAAC Twin Moose
400
0.0309
0.3304
1.77E-06
0.1682
1.2368
1.14E-06
840
ACSR Zebra
220
0.0697
0.3978
1.46E-06
0.2048
1.3344
9.14E-07
213
ACSR MOOSE
220
0.0749
0.3993
1.47E-06
0.2200
1.3392
9.20E-07
240
AAAC Zebra
220
0.0749
0.3993
1.47E-06
0.2200
1.3392
9.20E-07
212
800sqmm XLPE Cable
220
0.0321
0.1260
3.23E-05
0.1400
0.0680
3.00E-05
266
ACSR Panther
132
0.1622
0.3861
1.46E-06
0.4056
1.6222
8.99E-07
83
LARK
132
0.1622
0.3861
1.46E-06
0.4056
1.6222
8.99E-07
94
T Snowbird
132
0.0223
0.2900
1.96E-06
0.2840
0.9784
1.36E-06
432
161 sqmm G.F Cable
132
0.1400
0.1873
4.25E-05
0.2700
0.0519
4.25E-05
50
260 sqmm G.F Cable
132
0.0876
0.2167
4.55E-05
0.1695
0.0600
4.55E-05
70
400 sqmm XLPE Cable
220
0.0617
0.1360
2.20E-05
0.2040
0.0830
2.19E-05
100
630 sqmm XLPE Cable
132
0.0391
0.1267
2.27E-05
0.1120
0.0840
2.24E-05
130
800 Sqmm XLPE Cable
132
0.0321
0.1260
3.23E-05
0.1300
0.0680
3.00E-05
160
ACSR DOG 66 0.3274 0.4267 1.36E-06 0.5578 1.3688 9.84E-07 Note: Transmission lines parameters, which are not furnished by CTU and STU’s, is consider as per CEA transmissions planning criteria.
50
Conductor Type
20
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
3.4 Transformer parameters Actual transformer parameters wherever provided by CTU and STU’s is used. In cases where data is not furnished standard data as per CEA transmissions planning criteria given in Table 3.5 is considered. Table 3.5: Details of transformer parameters Type of Transformer
Transformer reactance Xt (at its own base MVA)
Generator transformer (GT)
14 – 15 %
Inter-Connecting Transformer (ICT)
12.50%
3.4.1 Voltage limits The steady-state voltage limits prescribed in CEA’s “Transmission Planning Criteria” at different voltage levels are presented in Table 3.6. Table 3.6: Voltage limits at different voltage levels prescribed in CEA’s “Transmission Planning Criteria” Normal rating Nominal Voltage (kV)
Maximum
Emergency rating
Minimum
Maximum
Minimum
kV
pu
kV
pu
kV
pu
kV
pu
765
800
1.05
728
0.95
800
1.05
713
0.93
400
420
1.05
380
0.95
420
1.05
372
0.93
220
245
1.11
198
0.90
245
1.11
194
0.88
132
145
1.10
122
0.92
145
1.10
119
0.90
66
72.5
1.10
60
0.91
72.5
1.10
59
0.89
3.5 Network element statistics for ER Grid 3.5.1 Substation details The summary of the number of substations present in the Eastern region state wise is presented in Table 3.7 and the complete list of substations along with load considered at each substation is given in Table A of Annexure-I. Table 3.7: Existing number of sub-station in the ER State Sl. No.
21
Substation* Bihar
Jharkhand
Odisha
Sikkim
W. Bengal
1
765 kV
2
1
2
-
-
2
400 kV
12
7
13
1
14
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
State Sl. No.
Substation* Bihar
Jharkhand
Odisha
Sikkim
W. Bengal
3
220 kV
24
16
26
-
39
4
132 kV
100
47
86
4
111
5
66 kV
-
-
-
19
-
Total No. of S/S in ER
524
Note: If 765/400/220 kV substation has 400/220 kV transformation level also, in that case 765/400/220 kV substation is counted as single 765 kV substation. *Above listed substation number excludes switching stations and generating stations.
3.5.2 Transmission line details The summary of Transmission line data present in the Eastern region is presented in Table 3.8 and the complete list of transmission lines state wise is given in Table B of Annexure-I. Table 3.8: Summary of transmission line data in the ER Sl. No.
Voltage (kV)
Line Length (ckm)
1
765
3014
2
400
34382
3
220
19202
4
132
29225
5
66
295
3.5.3 Transformer details The summary of Transformer data present in the Eastern region is presented below in Table 3.9 and the complete list of substation and their transformation capacity for each constituent state of ER Grid is given in Table A of Annexure-I. Table 3.9: Summary of transformers capacity in the ER
22
Sl. No
Voltage Ratio (kV)
Installed Capacity (MVA)
1
765
18000
2
400
36390
3
220
39140
4
132
38254
5
66
213
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
3.5.4 Generation details The summary of generator installed capacity present in the Eastern region state wise is presented in Table 3.10 and the complete list of generators is given in Table C of Annexure-I. Table 3.10: Summary of Generator installed capacity in the ER Installed capacity (MW)* Sl. No.
State Thermal
Hydro
1
Bihar
4545
35
2
Jharkhand
5251
289
3
Odisha
15956
2143
4
Sikkim
0
2072
5
West Bengal
14155
1265
39907
5804
Total ER 45711 *Note: Installed capacity includes central, state, IPP and CPP generations
3.5.5
HVDC details
The details of the existing converter stations used for HVDC transmission and HVDC Back to Back, considered in the studies are given in Table 3.11 and Table 3.12. Table 3.11: HVDC Back to Back in the ER Sl. No.
Parameter
Sasaram B2B
Gazuwaka B2B
1
Power Rating
1 X 500 MW
1 X 500 MW
1 X 500 MW
2
Number of blocks
1
Block 1
Block 2
3
AC voltage
400 kV
400 kV
400 kV
4
DC voltage
205 kV
205 kV
177 kV
5
Converter transformer (Inverter/Rectifier)
6 X 234 MVA
6 X 234 MVA
6 X 201.2 MVA
Table 3.12: HVDC Link in the ER
23
Sl. No.
Parameter
Talcher to Kolar
1
Power Rating
2000 MW
2
Number of Poles
2
3
AC voltage
400 kV
4
DC voltage
± 500 kV
5
Converter transformer (Inverter)
6 X 398 MVA
6
Converter transformer (Rectifier)
6 X 398 MVA
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
3.5.6
Reactor details
The complete list of state wise Series and shunt reactors installed in the Eastern region is presented in Table D and E of Annexure-I respectively.
3.5.7
Load details
The state wise summary of load data considered for the study is given in Table 3.13. Substation wise loading details considered for operational load flow is presented in Table F of Annexure-I. Table 3.13: Load Details of ER Sl. No.
Constituents
Load*
1
Bihar
3362
2
Jharkhand
1014
3
Odisha
3666
4
Sikkim
57
5
West Bengal
5854
6
DVC
2495
7
CESC
1676
8
DPL
231
*Note: 18354 MW (summation of recorded loads in S/S) on 04.05.2017 at 20:00 hrs in ER grid
3.6
Generation schedule details for operational load flow The generation schedule considered was based on the information obtained from the ERLDC and other constituents of ER grid. Power plant wise generation allocation is given in Table 3.14 and graphically represented in figure 3.2. Table 3.14: Generation schedule Details of ER
Sl.no.
State
Station Name
1
Muzaffarpur
2 3 4 5 6 7 8 9 10 11 12
24
Bihar
Jharkhand
Baruni TPS Kahalgaon Barh Patratu Thermal Tenughat Thermal Sikidiri Gen Koderma Thermal Chandrapura Thermal Maithon Dam Bokaro Thermal Adhunik Thermal
PRDC Bangalore
Owned By Joint venture of NTPC & BSEB BSEB NTPC JVNL
DVC APNRL
Scheduled Generation (MW) 90.0 70.0 1710.0 636.0 50.0 124.0 45.0 456.4 640.0 34.1 625.0 488.0 September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.no. 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
State
Odisha
Sikkim
45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
25
West Bengal
Station Name
Owned By
Maithon RB Thermal Inland Power ABCIL Upper Kolab indravati Rengali Hirakud Chiplima Talcher Thermal IB Thermal Balimela Machkund Talcher Super Thermal Meenakshi Power GMR Jindal Thermal Sterlite Energy Net CPP Injection to Grid Rangeet Hydro Teesta 5 Hydro Teesta 3 Lagit Hydro Meyong Hydro Rongli Hydro Chuzachen Jorethang Bandel Thermal Santaldih Thermal Kolaghat Thermal Bakreswar Thermal Sagardighi Thermal TCF Purulia Pump Storage Hydro Jaldhaka Hydro Rammam Hydro Teesta Load Dam Hydro Farakka Super Thermal Mejia DTPS Raghunathpur Durgapur Steel Thermal DPL Thermal Budge Budge SRS TRS Haldia Thermal Net CPP Injection to Grid
MPL
PRDC Bangalore
OHPC
NTPC OPGC OHPC NTPC GMR Kamalanga Energy JITPL Vedanta Ltd. NHPC
Sikkim Gov. Gati Infrastructure Pvt. Ltd DANS Energy Pvt. Ltd.
WBPDCL
Scheduled Generation (MW) 513.0 62.1 24.0 240.0 566.0 187.4 95.7 22.7 432.0 258.0 326.0 47.1 1669.0 20.0 997.0 456.0 0.0 591.0 57.0 528.0 714.0 0.0 0.0 0.0 72.0 54.8 322.1 467.0 544.5 955.0 852.0 6.1 342.8
WBSEDCL NHPC NTPC DVC DPL CESC
27.0 12.2 212.0 1519.9 1682.0 197.5 349.8 935.0 450.0 690.0 87.0 0.0 552.0 124.4 September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC Figure 3.2: Scheduled generation, Import and Export of Eastern Regional grid
26
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
4 OPERATIONAL LOAD FLOW STUDY 4.1 Introduction to Load flow analysis One of the most common computational procedures used in power system analysis is the load flow calculation. The planning, design and operation of power systems require such calculations to analyze the steady state performance of power system under various operating conditions and to study the effects of changes in network configuration. These load flow solutions are performed using computer programs designed specifically for this purpose. The basic question in the load flow analysis is: “Given the demand at all buses of a known electric power system configuration and the power production at each generator, find the power flow in each line and transformer of the interconnecting network and the voltage magnitude with phase angle at each bus.“ Analyzing the solution of load flow analysis for numerous conditions helps ensure that the power system is designed to satisfy its performance criteria while incurring the most favorable investment and operation costs. Some examples of the uses of load flow studies are to determine, Component or circuit loading. Steady state bus voltages. Active and Reactive power flows. Transformers tap settings. System losses. Performance under emergency conditions. Modern systems are complex and have many paths or branches over which power can flow. Such systems form networks of series and parallel paths. Electric power flow in these networks divides among the branches until a balance is reached in accordance with established circuit theory. Computer programs to solve load flows are divided into two type’s static (offline) and dynamic (real time). Most load flow studies for system analysis are based on static network models. Real time load flows (online) that incorporate data input from the actual networks are typically used by utilities in Supervisory Control and Data Acquisition (SCADA) systems. Such systems are used primarily as operating tools for optimization of generation, VAr control, dispatch, losses, and tie line flow control. This discussion is concerned with only static network models and their analysis.
27
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
A load flow calculation determines the state of the power system with respect to a given load and generation schedule. It represents a steady state condition which is assumed to remain fixed for some time. In reality, line flows and bus voltages fluctuate in small amounts because load changes due to lights, motors, and other loads being turned on or off in the system. However, these small fluctuations are ignored in calculating the steady state effects on system equipment. As the load distribution, and hence power flow in the network vary considerably during different time periods, it may be necessary to obtain load flow solutions representing different system conditions such as peak load, average load or light load. Generally, these solutions provide, Optimum operating modes for normal conditions, such as proper setting of voltage control devices, or how the system will respond to abnormal conditions, such as outage of transformers or lines. When the new equipment additions are needed. Effectiveness of new alternatives to solve present deficiencies and meet future requirements. The load flow model is also the basis for several other types of studies such as short circuit, stability, motor starting, and harmonic studies. The load flow model supplies the network data and an initial steady state condition for these studies. The present study is carried out to determine the power flows at different lines/transformers and to compute the voltage profile at different buses of the existing system. The system configuration considered for the study and simulation results are explained in the subsequent sections.
28
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
4.2 Load Generation Balance from the results of operational load flow analysis The detail of load generation balance of ER is given in Table 4.1 and state wise load generation balance is presented in Table 4.2, 4.3, 4.4, 4.5, 4.6, 4.7 and 4.8. The detailed load and generation data is given in Annexure-I. Table 4.1: Load generation balance Details of ER Sl. No.
Description
Quantity (MW)
1
Generation
23326
2
Import
2064
Total (Generation + Import)
25390
3
Loss
749*(2.95%)
4
Load
18354
Demand Met (Load + Loss) 5
Export
19103 6287
Total System (Load + Export + Loss)
25390
*Note: Only for 765 kV, 400 kV, 220 kV, 132 kV and 66 kV transmission network. Table 4.2: Load generation balance details of Bihar Sl. No.
Description
Quantity (MW)
1
Generation
2505
2
Import
3789.6
Total Total(Generation + Import)
6295
3
Loss
134* (2.12%)
4
Load
3362
Demand Met (Load + Loss) 5
Export Total (Load + Export + Loss)
3496 2799 6295
*Note: Only for 765 kV, 400 kV, 220 kV and 132 kV transmission network Table 4.3: Load generation balance details of Jharkhand Sl. No.
Description
Quantity (MW)
1
Generation
1306
2
Import
3202
Total (Generation + Import) 3
Loss
38*(0.84%)
4
Load
1014
Demand Met (Load + Loss)
29
4508
PRDC Bangalore
1052 September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No.
Description
Quantity (MW)
5
Export
3456
Total (Load + Export + Loss)
4508
*Note: Only for 765 kV, 400 kV, 220 kV and 132 kV transmission network Table 4.4: Load generation balance details of Odisha Sl. No.
Description
Quantity (MW)
1
Generation
5908
2
Import
1396
Total (Generation + Import)
7304
3
Loss
155*(2.12%)
4
Load
3666
Demand Met (Load + Loss) 5
Export Total (Load + Export + Loss)
3822 3482 7304
*Note: Only for 765 kV, 400 kV, 220 kV and 132 kV transmission network Table 4.5: Load generation balance details of Sikkim Sl. No.
Description
Quantity (MW)
1
Generation
1426
2
Import
0
Total (Generation + Import)
1426
3
Loss
14*(0.98%)
4
Load
57
Demand Met (Load + Loss) 5
Export Total (Load + Export + Loss)
71 1355 1426
*Note: Only for 400 kV, 132 kV and 66 kV transmission network Table 4.6: Load generation balance details of West Bengal Sl. No.
Description
Quantity (MW)
1
Generation
5930
2
Import
3667
Total (Generation + Import) 3
Loss
321*(3.35%)
4
Load
5854
Demand Met (Load + Loss) 5
Export Total (Load + Export + Loss)
30
9597
PRDC Bangalore
6175 3422 9597 September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
*Note: Only for 400 kV, 220 kV and 132 kV transmission network Table 4.7: Load generation balance details of DVC Sl. No.
Description
Quantity (MW)
1
Generation
5024
2
Import
702
Total (Generation + Import)
5726
3
Loss
68*(1.19%)
4
Load
2495
Demand Met (Load + Loss) 5
2563
Export
3164
Total (Load + Export + Loss)
5727
*Note: Only for 400 kV, 220 kV and 132 kV transmission network Table 4.8: Load generation balance details of CESC Sl. No.
Description
Quantity (MW)
1
Generation
777
2
Import
913
Total (Generation + Import)
1690
3
Loss
14*(0.82%)
4
Load
1676
Demand Met (Load + Loss) 5
1690
Export
0
Total (Load + Export + Loss)
1690
*Note: Only for 220 kV and 132 kV transmission network Table 4.9: Load generation balance details of DPL Sl. No.
Description
Quantity (MW)
1
Generation
450
2
Import
0
Total (Generation + Import)
450
3
Loss
5*(1.02%)
4
Load
231
Demand Met (Load + Loss) 5
Export Total (Load + Export + Loss)
236 214 450
*Note: Only for 220 kV and 132 kV transmission network. A block diagram illustrating the interstate and inter regional power exchange of ER is presented in figure 4.1
31
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Figure 4.1: Block diagram of load generation balance of ER
Note: Inter regional exchange is shown as net exchange
32
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
4.3 Line loading conditions Under operational load flow study, number of lines whose loading is below 5% and above 80% is presented in Table 4.10 for complete ER grid and Table 4.11 to 4.18 for constituent state of ER grid. Table 4.10: Percentage loading details of lines of Eastern Region Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
1
765
14.50
4.00
7.00
0
0
3
2
400
81.60
2.10
19.68
0
1
8
3
220
105.00
0.20
30.81
2
7
20
4
132
125.90
0.10
32.09
5
42
89
5
66
26.90
1.30
12.19
0
0
6
Table 4.11: Percentage loading details of lines of Bihar Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
1
765
11.20
4.70
7.95
0
0
1
2
400
51.60
6.70
21.16
0
0
0
3
220
98.60
13.60
45.92
0
3
0
4
132
99.20
0.10
35.20
0
18
18
Table 4.12: Percentage loading details of lines of Jharkhand Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
1
765
10.40
5.60
8.00
0
0
0
2
400
38.60
2.10
17.28
0
0
3
3
220
62.30
2.20
21.70
0
0
4
4
132
85.90
0.30
25.07
0
1
11
33
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table 4.13: Percentage loading details of lines of Odisha Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
1
765
6.50
4.00
5.20
0
0
2
2
400
56.80
4.00
18.15
0
0
3
3
220
82.50
0.30
25.46
0
1
10
4
132
118.60
0.10
28.22
1
8
34
Table 4.14: Percentage loading details of lines of Sikkim Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
1
400
81.60
9.60
48.27
0
1
0
2
220
11.90
9.10
10.60
0
0
0
3
132
77.5
3.6
38.22
0
0
1
4
66
44.70
0.10
9.77
0
0
10
Table 4.15: Percentage loading details of lines of West Bengal Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
1
400
43.10
2
220
3 4
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
4.00
20.33
0
0
1
105.00
0.20
34.00
2
2
3
132
125.90
0.40
36.29
4
15
16
66
26.90
26.80
26.85
0
0
0
Table 4.16: Percentage loading details of lines of DVC Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
1
400
39.6
2
220
72.7
34
PRDC Bangalore
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
6.7
25.4
0
0
0
1.6
24.35
0
0
3
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
3
132
84.8
0.5
25.25
0
2
13
Table 4.17: Percentage loading details of lines of CESC Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
2
220
87.2
47.7
56.24
0
1
0
3
132
102.7
2.5
43.94
1
2
3
Table 4.18: Percentage loading details of lines of DPL Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of lines Over 100%
No of lines Over 80%
No of Lines less than 5%
1
132
67.70
11.90
29.92
0
0
0
4.4 Transformer loading conditions Under operational load flow study, number of transformers whose loading is below 20% and above 80% is presented in Table 4.19 for complete ER grid and Table 4.20 to 4.27 for constituent state of ER grid. Table 4.19: Percentage loading details of Transformers of Eastern Region Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
1
765
14.6
2
400
3
Avg
No of Transformers Over 100%
No of Transformers Over 80%
No of Transformers less than 20%
3.9
6.98
0
0
13
94.5
1.4
47.26
0
8
23
220
98.4
1.8
43.84
0
16
80
4
132
101.9
1.1
44.12
1
52
145
5
66
55.9
19.8
30.43
0
0
4
35
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table 4.20: Percentage loading details of Transformers of Bihar Loading Percentage Sl.No
Voltage Grade (kV)
Max
1
765
14.6
2
400
75.8
3
220
75.8
4
132
99.2
Avg
No of Transformers Over 100%
No of Transformers Over 80%
No of Transformers less than 20%
3.9
7.47
0
0
5
17.6
51.48
0
0
2
13.8
47.13
0
0
6
4.1
42.83
0
8
32
Min
Table 4.21: Percentage loading details of Transformers of Jharkhand Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of Transformers Over 100%
No of Transformers Over 80%
No of Transformers less than 20%
1
765
9
9
9.00
0
0
2
2
400
77.6
1.4
44.56
0
0
2
3
220
52.8
3.1
33.03
0
0
4
4
132
88.5
1.8
36.60
0
1
23
Table 4.22: Percentage loading details of Transformers of Odisha Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
1
765
7.2
2
400
3 4
Avg
No of Transformers Over 100%
No of Transformers loaded 80% and above
No of Transformers less than 20%
5
5.88
0
0
6
79.9
7.8
36.73
0
0
10
220
98.4
1.8
37.13
0
5
50
132
83.7
1.1
41.17
0
5
43
Table 4.23: Percentage loading details of Transformers of Sikkim Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
1
400
87.6
2
220
31.6
3
132
4
66
36
Avg
No of Transformers Over 100%
No of Transformers loaded 80% and above
No of Transformers less than 20%
2.4
46.03
0
3
5
2.4
25.00
0
0
5
93
10.9
37.87
0
2
2
53
19.8
29.27
0
0
4
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table 4.24: Percentage loading details of Transformers of West Bengal Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
1
400
94.5
2
220
94.5
3
132
4
66
Avg
No of Transformers Over 100%
No of Transformers loaded 80% and above
No of Transformers less than 20%
4.5
53.04
0
5
2
4.5
49.36
0
9
8
101.9
3
50.45
1
27
25
55.9
55.9
55.90
0
0
0
Table 4.25: Percentage loading details of Transformers of DVC Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of Transformers Over 100%
No of Transformers Over 80%
No of Transformers less than 20%
1
400
55.3
55.3
55.3
0
0
0
2
220
80.2
2.2
43.76
0
1
5
3
132
91.7
2.9
42.97
0
3
16
Table 4.26: Percentage loading details of Transformers of CESC Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of Transformers Over 100%
No of Transformers Over 80%
No of Transformers less than 20%
1
220
79.3
8.5
57.81
0
0
2
2
132
85.5
8.5
50.00
0
6
4
Table 4.27: Percentage loading details of Transformers of DPL Loading Percentage Sl.No
Voltage Grade (kV)
Max
Min
Avg
No of Transformers Over 100%
No of Transformers Over 80%
No of Transformers less than 20%
1
220
81.3
60.5
66.74
0
1
0
2
132
64.6
6.7
35.83
0
0
7
37
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
4.5 Voltage profile Bus Voltage Profile for Eastern Region grid is presented in Table 4.28 Table 4.28: Bus Voltage Profile for Eastern Region Bus Voltage In pu
Sl.No
Voltage Grade (kV)
Max
Bus name
Min
1
765
1.009
Jharsuguda
2
400
1.031
DSTPS
3
220
1.031
4
132
5
66
Bus name
Average
0.988
Gaya
0.998
0.987
Jeerat
1.009
Arrah
0.946
Balimela
0.992
1.026
Machkund
0.902
Buxar
0.967
1.011
Rangit
0.969
Chalsa
0.991
Note: As observed in operational load flow study that bus voltage of ER grid is within the acceptable limit (as per CEA grid code).
Comparison of SCADA record with simulated result for 765 kV and 400 kV Bus Voltage of Eastern Region grid is presented in Table 4.29
38
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table 4.29: 765 kV and 400 kV Bus Voltage of Eastern Region grid
SI.No
Name of the SubStation
Voltage level (kV) Nominal
Voltage in pu Recorded
Difference
% Difference
Simulated
Bihar 765
0.986
0.995
0.009
0.911%
400
0.983
0.996
0.013
1.333%
765
0.986
0.988
0.003
0.272%
400
0.995
0.995
0.001
0.060%
Banka
400
1.018
1.012
-0.006
-0.560%
Barh
400
1.025
1.013
-0.012
-1.132%
5
Biharsharif
400
0.995
1.014
0.019
1.859%
6
Kahalgaon
400
1.018
1.018
0.001
0.088%
7
Muzaffarpur
400
0.993
1.001
0.008
0.856%
8
New Purnea
400
0.993
1.011
0.019
1.904%
9
Patna
400
1.009
1.006
-0.003
-0.253%
10
Lakhisarai
400
1.008
1.007
0.000
-0.020%
11
Kishanganj
400
1.008
1.012
0.004
0.397%
1
Sasaram
2
Gaya
3 4
Jharkand 765
1.016
1.006
-0.010
-0.993%
400
1.028
1.008
-0.020
-1.927%
Jamshedpur
400
1.025
1.020
-0.005
-0.459%
3
Maithon
400
1.018
1.014
-0.004
-0.344%
4
Ranchi
400
1.020
1.016
-0.004
-0.392%
1
Ranchi New
2
39
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the SubStation
Voltage level (kV) Nominal
Recorded
Simulated
Voltage in pu
Difference
% Difference
5
Chaibasa
400
1.025
1.015
-0.010
-0.966%
6
Koderma (KTPS)
400
1.018
1.013
-0.004
-0.423%
7
BTPS-A (Bokaro)
400
1.028
1.019
-0.009
-0.847%
8
TISCO
400
1.010
1.017
0.007
0.703%
9
Chandwa
400
1.005
0.999
-0.006
-0.577%
Odisha 765
1.009
1.009
0.000
0.025%
400
1.028
1.018
-0.010
-0.934%
765
1.018
1.004
-0.015
-1.424%
400
1.010
1.007
-0.003
-0.277%
Bisra
400
1.010
1.013
0.003
0.297%
4
Bolangir
400
0.994
1.008
0.014
1.406%
5
Indravati
400
0.995
0.994
-0.001
-0.060%
6
Jaypore
400
0.988
0.994
0.006
0.618%
7
Kaniha
400
0.993
1.002
0.010
0.997%
8
Keonjhar
400
1.018
1.006
-0.012
-1.170%
9
Kuchei/Baripada
400
1.005
1.008
0.003
0.328%
10
Mendhasal
400
0.995
0.999
0.004
0.412%
11
Meramundali
400
1.013
1.009
-0.003
-0.326%
12
Rengali
400
0.995
1.004
0.009
0.935%
13
New Duburi
400
1.008
1.005
-0.003
-0.258%
14
Sterlite
400
1.025
1.015
-0.010
-0.976%
15
Pandiabil
400
0.999
0.999
0.000
-0.043%
1
Jharsuguda
2
Angul
3
40
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the SubStation
Voltage level (kV) Nominal
Recorded
Simulated
Voltage in pu
Difference
% Difference
16
JITPL
400
1.022
1.020
-0.002
-0.225%
17
GMR
400
1.009
1.009
0.000
0.050%
18
JSPL
400
0.995
1.008
0.013
1.276%
1.000
0.999
-0.002
-0.155%
0.998
1.000
0.002
0.201%
Sikkim 1
Rangpo
400
2
Teesta V
400
West Bengal 1
Arambagh
400
1.028
1.002
-0.026
-2.511%
2
Jeerat
400
0.983
0.987
0.005
0.499%
3
Bidhannagar (WBSETCL)
400
1.015
1.010
-0.005
-0.502%
4
Kharagpur
400
1.007
1.006
-0.001
-0.070%
5
Bakreswar
400
0.990
0.991
0.001
0.111%
6
Kolaghat TPS
400
1.000
1.001
0.001
0.100%
7
Sagardighi
400
1.023
1.019
-0.003
-0.303%
8
Binaguri
400
1.008
1.006
-0.002
-0.169%
9
Malda
400
1.025
1.021
-0.004
-0.390%
10
Parulia (Durgapur PG)
400
1.023
1.010
-0.012
-1.193%
11
Farakka
400
1.033
1.024
-0.009
-0.862%
12
Subhashgram
400
0.998
0.989
-0.009
-0.852%
13
Raghunathpur DSTPS
400
1.037
1.031
-0.007
-0.646%
14
Mejia
400
1.028
1.028
0.000
0.019%
15
PPSP
400
1.030
1.021
-0.009
-0.893%
16
Berhampore
400
1.022175
1.016
-0.006
-0.624%
41
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the SubStation
Voltage level (kV) Nominal
Recorded
Simulated
Voltage in pu
Difference
% Difference
17
Alipurduar
400
1.0225
1.022
-0.001
-0.098%
18
Haldia
400
1.005
1.007
0.002
0.229%
42
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
4.6 Analysis of the load flow study results Power map of ER grid along with separate power map of constituent states (Bihar, Jharkhand, Odisha, Sikkim and West Bengal) for operational load flow study is presented in Annexure-II. Line loading details are presented in Table G of Annexure-II. All the bus Voltages (765 kV, 400 kV, 220 kV, 132 kV and 66 kV) were within the standard tolerance limits (as per CEA grid code). Total nine numbers of line/Transformers loaded beyond 100%, rest of the network elements were loaded within the rated capacity under summer-peak operating condition of 4th May 2017 at 20.00 hrs. Maximum inter regional power exchange is 3122 MW to SR.
43
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
5 SHORT CIRCUIT STUDIES Even the most carefully designed power systems may be subjected to damaging arc blast or overheating and the explosive magnetic forces associated with high magnitude currents flowing during a short circuit. To ensure that circuit’s protective equipment can isolate faults quickly and minimize system component damage, personal hazard and outage severity, it is essential that a short circuit study be included in the electrical design of new industrial and commercial power systems, and for modifications to existing system. There are five possibilities for a short circuit in three-phase system.
3-phase to ground fault.
Single line to ground fault.
Line to line fault.
Double line to ground fault.
Open conductor fault.
If a short circuit of one type is not interrupted promptly, it often progresses to another type, which generally results in more severe damage. For example in a solidly grounded system, a single line to ground fault, if not interrupted, can quickly escalate to a double line to ground or a three phase to ground fault. The choice of study that is required for a particular system is a matter of engineering judgment based on an analysis of the basic single line diagram and determination of the specific purpose of the study. For the three-phase industrial and commercial power systems, the most common study is the calculation of three-phase (balanced) short circuit current which is more severe compared to other faults, specifically for comparison with switching equipment capability. The short circuit current determined from this type of study generally represents the highest value at a particular location in the system. It is important to realize that single line to ground or double line to ground short circuit current magnitude can exceed three-phase short circuit current under certain conditions. This condition may arise near,
Solidly grounded synchronous machines.
Solidly grounded star connection of a delta-star transformer of the threephase core design.
44
Grounded star-delta tertiary autotransformers.
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Grounded star-delta tertiary three winding transformers.
In system where any of these machines or transformer connections exists, it may be necessary to conduct a single line to ground short circuit study. Medium and high voltage circuit breakers have 15% higher interrupting capability for single line to ground short circuits than for phase to phase or three phase short circuits. This difference must be taken into account when comparing short circuit duty with equipment ratings. Further, future network growth (about 20% increases in result obtained through study) has to be accounted while considering the fault levels for equipment ratings.
5.1 Short circuit study result analysis The detailed results of the Short circuit study for the three phases to ground fault and single line to ground faults are tabulated in Table H and presented in Annexure-III. Based on the detailed analysis, it is observed that For 400 kV 220 kV and 132 kV voltages, 3-phase fault level & SLG fault level at some of the substations are at the critical level. Fault levels which are more than 80% of breaker rating are listed in Table 5.1 and Table 5.2. For 765 kV & 66 kV voltage level, there are no violation in the fault level. Table 5.1: 3-Ph fault levels > 80% of breaker rating Sl.No.
Substation Name
1
CTPS-A CTPS-B Angul Meramandali Budhipadar
2 3 4 5
Rated Voltage (kV)
3-Phase fault (MVA)
Fault Current (kA)
132
5765.10
25.22
132
5765.89
25.22
400
36101.97
52.11
220 220
13069.98 14262.63
34.3 37.43
Table 5.2: SLG fault levels > 80% of breaker rating Substation Name
Rated Voltage (kV)
SLG fault (MVA)
CTPS-A
132
6035.999
Fault Current (kA) 26.401
CTPS-B
132
6034.305
26.393
2
Meramandali
220
13003.502
34.125
3 4 5 6 7
Budhipadar Vedanta NALCO Mejia BTPS132
220 220 220 220 132
13967.8 12652.203 12347.226 12840.489 6114.185
36.656 33.203 32.403 33.698 26.743
Sl.No. 1
45
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Note: In some of the Generating stations the SLG fault rating is exceeding 80% while the three phase fault rating is within 80% of breaker capacity.
46
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
6 CONCLUSION Based on the operational load flow studies carried out for said condition following observation are made, The voltages at all the bus bars (765 kV, 400 kV, 220 kV, 132 kV and 66 kV) were within the standard tolerance limits (as per CEA grid code). Number of line/Transformers were loaded beyond 100% is 9, rest of line/Transformers loaded within the rated capacity under summer-peak operating condition of 4th May 2017 at 20.00 hrs. Maximum inter regional power exchange is 3122 MW to SR. It is observed that short circuit levels are critical at some of the substations but within the breaker rated capacity. Such cases are listed above in section 5.1. The network modeling for operational load flow and short circuit study and the results will provide the base for the subsequent protection system analysis and calculation. This will also provide the base for transient studies and tripping analysis.
47
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
ANNEXURE-1 EXISTING EASTERN REGION TRANSMISSION NETWORK AND LOAD DETAILS
48
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table A: State wise list of substation present in the eastern region grid
SI.No
Name of the Substation
Voltage level (kV)
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) Bihar
Owned By
765kV Level 765/400 1
Sasaram
400/220 132/33 765/400
2
Gaya
1 2 3 4
Banka Barh Biharsharif Kahalgaon
5
Muzaffarpur
400/220 400/132 400/132 400/220 400/132 400/220 220/132
6
New Purnea
400/220
7 8
Patna Lakhisarai
9
Sasaram B2B
10 11
Kishanganj Nabinagar RLY Darbhanga (DMTCL)
400/220 400/132 400/(93/√3)/ 93 400/220 400/132
12
400/220
1 1 1 2 3 1 1 400kV Level 2 2 3 2 2 1 1 1 1 2 2
1500 315 500 10 1500 315 500
1500 315 500 20 4500 315 500 400 400 945 400 630 500 100 315 500 630 400
2 2
200 200 315 200 315 500 100 315 500 315 200 234/117/1 17 500 200
2
3
220kV Level 3 1 2
PGCIL NTPC PGCIL NTPC
PGCIL
1000 400
Railway
160
320
DMTCL
160 160 100
480 160 200
PGCIL
Purnea
220/132
2
Arrah
220/132
3
Amnour (Chhapra)
220/132
2
100
200
4
Biharshariff
5
Bodhgaya
6
Darbhanga new
7
Dehri
8
Fatuha
220/132 132/33 220/132 220/132 132/33 220/132 220/132 132/33 220/132 132/33
3 1 4 1 3 2 4 2 5 3
150 20 150 160 50 160 100 50 100 50
450 20 600 160 150 320 400 100 500 150
PRDC Bangalore
PGCIL
1350
1
49
PGCIL
BSPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
9
Gopalganj
10
Khagaul
11
Begusarai
12
Sipara
13
Hazipur New
14
Madhepura
15
Pusauli New
16
Sonenagar Muzaffarpur (MTPS) Kishanganj _New Muzzafarpur_BS PTCL
17 18 19
Voltage level (kV) 220/132 132/33 220/132 132/33 220/132 132/33 220/132 220/132 132/33 220/132 220/132 132/33 220/132 132/33 220/132 132/33
3 3 4 5 4 3 2 1 2 2 3 2 2 2 2 2
100 50 100 50 100 50 150 160 50 100 100 20 150 50 160 50
300 150 400 250 400 150 300 160 100 200 300 40 300 100 320 100
220/132
3
100
300
160 160 50 160 50 160 50 160 50 160 50 160 50
320 320 150 320 150 320 100 320 100 320 150 320 150
20 50 20 20 50 20 20 20 50 20 20 50 50
20 150 40 20 50 60 60 40 50 40 20 50 150
220/132 220/132 132/33 220/132 132/33 220/132 132/33 220/132 132/33 220/132 132/33 220/132 132/33
20
Musahari_BSPT CL
21
Samastipur_New
22
Sonenagar_New
23
Mushahri
24
Motipur
1
Arrah
132/33
2
Ataula (Arwal)
3
Aurangabad
4 5 6
Banjari Banka Banmakhi
132/33 132/33 132/33 132/33 132/33 132/33
7
Barauni TPS
132/33
8
Barh
132/33
9
Baripahari
132/33
50
PRDC Bangalore
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA)
2 2 3 2 3 2 2 2 2 2 3 2 3 132kV Level 1 3 2 1 1 3 3 2 1 2 1 1 3
Owned By
BSPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
10 11 12
Belaganj BENIPATTI Belsand
132/33 132/33 132/33
13
Bettiah
132/33
14
Bihta
132/33
15
Bikramganj
132/33
16
Buxar
132/33
17
Chandauti (Gaya)
132/33 132/25
18
Chhapra
132/33
19 20
Darbhanga (old) Dhaka
21
Dalsingsarai
22
Digha
132/33 132/33 132/33 132/33 132/33
23
Dumraon
132/33
24
Ekma Ekanga Sarai (Ekanagar)
26
Forbeshganj
132/33
27 28 29 30 31 32 33 34 35 36 37 38
Goh Gangwara Gaighat Hazipur Hulasganj Harnaut Hathidah Hathua Imamganj Jagdishpur Jandaha Jainagar
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
39
Jakkanpur
132/33
40
Jamalpur
132/33
41
Jamui
132/33
42
Jehanabad
132/33
43
Kahalgaon
132/33
25
51
PRDC Bangalore
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA)
132/33
2 2 2 2 1 3 2 1 2 1 2 2 2 1 2 3 2 1 3 1 1 1
20 20 10 20 50 50 20 50 20 50 50 13.35 20 50 50 20 20 50 50 20 50 20
40 40 20 40 50 150 40 50 40 50 100 26.7 40 50 100 60 40 50 150 20 50 20
132/33
3
20
60
2 1 2 2 2 3 2 2 3 2 2 2 2 3 4 1 2 2 1 2 2 2
20 50 20 50 50 50 20 20 20 20 20 20 20 20 50 20 50 20 50 20 20 50
40 50 40 100 100 150 40 40 60 40 40 40 40 60 200 20 100 40 50 40 40 100
Owned By
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA)
45
Kataiya
132/33 132/33
46
Katihar
132/33
47
132/33 132/33
2
20
40
49 50 51
Katra Kusheshwarstha n Kochas Karbigahiya Kudra
2 1 1 1 2 1 3 1 3
132/33 132/33 132/33
52
Khagaria
132/33
53
Kishanganj
132/33
54 55 56 57 58 59
Lakhisarai Madhubani Manjhaul Masaurhi Mahanar Mithapur
132/33 132/33
2 4 2 2 1 2 1 3 2
20 50 20 20 50 50 20 20 20
40 200 40 40 50 100 20 60 40
60
Mohania
132/33
61
Motihari
132/33
62 63 64 65 66
Masrakh Muzaffarpur Nalanda Narkatyagaunj Naugachhia
132/33 132/33 132/33 132/33 132/33
67
Nawada
132/33
68
Pandaul
132/33
69 70
Phulparas Pupri
132/33 132/33
71
Purnea
132/33
72
Rafiganj
132/33
73 74
Rajgir Ramnagar
132/33 132/33
3 2 2 1 1 1 1 2 3 2 2 3 1 3 2 1 2 2 1 2 1 1 2 2
20 20 50 50 20 20 50 20 50 20 20 20 20 50 20 50 20 20 20 50 50 20 20 20
60 40 100 50 20 20 50 40 150 40 40 60 20 150 40 50 40 40 20 100 50 20 40 40
132/33 44
Karmnasa 132/25
48
52
PRDC Bangalore
132/33 132/33 132/33
50 20 21.6 20 20 50 20 50 50
100 20 21.6 20 40 50 60 50 150
Owned By
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
75
Name of the Substation
77 78 79 80 81 82 83 84 85 86 87 88
Raxaul Remi nagar (Runni Saidpur) Sherghati SKMCH Sonebarsa Sabour Saharsa Samastipur Sasaram Shekhpura Sheohar Sherghati Sheetalpur Sitamarhi
89
Siwan
76
Voltage level (kV) 132/33 132/33
1 2
50 20
50 40
132/33
2
20
40
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
2 2 2 3 1 2 2 2 2 2 2 3 1 2 1 1 1 1 2 2 3 2 2 2 2 2 2 1 2
20 50 20 50 20 20 50 20 50 20 20 50 20 50 50 20 21.6 20 20 50 20 20 20 20 20 20 20 10 20
40 100 40 150 20 40 100 40 100 40 40 150 20 100 50 20 21.6 20 40 100 60 40 40 40 40 40 40 10 40
1500
3000
132/33 132/33
90
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA)
Sonenagar 132/25
91
Sultanganj
132/33
92 93 94 95 96 97 98 99 100
Supaul Tarapur Tehta Tekari Triveniganj Udaikishanganj Vaishali Valmikinagar Wazirganj
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
Owned By
Jharkhand 1
Ranchi New
2 3 4
Jamshedpur (3*315) Maithon Ranchi Chaibasa
5
Koderma (KTPS)
6
BTPS-A (Bokaro)
1
53
PRDC Bangalore
765/400
765kV Level 2 400kV Level
400/220
2
315
630
400/220 400/220 400/220 400/220 220/132 400/220/33
2 2 2 2 2 2
315 315 315 315 150 315
630 630 630 630 300 630
PGCIL
PGCIL
DVC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
7
TISCO
400/220
1
Chandil
2
Chaibasa
3
Hatia New
220/132 220/132 132/33 220/132 220/132
4
Lalmatiya
5 6 7 8
PTPS Ramachandrapur TTPS Dumka (New)
9
BTPS-B (Bokaro)
10
CTPS
11
Giridhi
12
Jamshedpur
132/33 220/132 220/132 220/132 220/132 220/132 132/33 220/132/11 132/33 220/132/33 220/33 132/33 220/132/33 132/33 220/132
13
Ramgarh
14
Dhanbad
15
Ramkanali
16
Kalyanswari
1 2 3 4 5 6 7 8
Maniqui Adityapur Chakradharpur Dalbhumgarh Chaibasa Manoharpur Deogarh Dumka
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
9
Garhwa Road
132/33
10 11 12
Goielkara Golmuri Gumla
132/33 132/33 132/33
54
PRDC Bangalore
132/33 220/33 220/132 132/33 220/132/33 220/132/33 132/33
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 2 220kV Level 4 2 2 3 1 1 2 2 3 2 2 2 2 3 2 2 2 3 2 3 2 2 1 2 1 2 2 1 2 132kV Level 2 4 2 3 1 2 3 2 1 1 1 2 2
315
630
100 150 50 150 100 20 50 150 150 250 150 150 50 150 80 150 80 80 150 50 150 80 50 80 150 25 150 160 50
400 300 100 450 100 20 100 300 450 500 300 300 100 450 160 300 160 240 300 150 300 160 50 160 150 50 300 160 100
50 50 20 50 25 50 50 50 50 20 20 50 20
100 200 40 150 25 100 150 100 50 20 20 100 40
Owned By
JUSNL
DVC
JUSNL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
13 14 15 16
Hatia old Tamar Madhupur Sikidri
132/33 132/33 132/33 132/33
17
Jadugoda
132/33
18
Jamtara
132/33
19
Japla
132/33
20
Kamdara
132/33
21
Kanke
132/33
22
Kendposi
132/33
23 24 25 26 27
Latehar Lohardaga Namkum Nowamundi Pakur
132/33 132/33 132/33 132/33 132/33
28
Rajkharsawan
132/33
29 30
Sahebgunj Daltonganj
132/33 132/33
31
Koderma
32
Nimiaghat
33 34
North Karnapura Pradhankanta
35
Patherdhi
36 37
Patratu (DVC) Putki
38
Barhi
39
Gola
40 41
Hazaribag Road Hazaribagh
42
Kumardhubi
43
Konar
55
PRDC Bangalore
132/33 132/25 132/33 132/25 132/33 132/33 132/33 132/33 132/25 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/25 132/33
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 4 2 2 2 2 1 1 1 2 2 1 2 1 1 2 2 3 1 2 1 1 2 2 1 1 1 2 2 2
50 50 50 20 20 50 50 20 20 20 50 50 20 50 50 50 50 50 50 20 50 50 50 80 50 25 31.5 25 50
200 100 100 40 40 50 50 20 40 40 50 100 20 50 100 100 150 50 100 20 50 100 100 80 50 25 63 50 100
80 50 12.5 31.5 80 50 31.5 31.5 20
160 50 25 31.5 240 50 31.5 31.5 20
50 50 80 25 20
100 100 80 50 20
Owned By
No Load 2 1 2 1 3 1 1 1 1
DVC
No load 2 2 1 2 1
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
44
Mosabani
45 46 47
Biada MHS-Right bank Panchet
Voltage level (kV) 132/33 132/33 132/33 132/33 132/33
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 1 1 2 2 1
31.5 20 80 50 50
31.5 20 160 100 50
1500 1500
3000 6000
315 315 315 315 315 315 315
630 630 630 630 630 630 630
500 160 315
500 320 630
100 20 315 100 12.5 315 315 315 500
200 20 630 300 12.5 630 630 630 1000
160 160 63 40 100 63 40 160 100 63 40 160 12.5
320 320 126 40 300 126 40 160 200 126 40 320 12.5
Owned By
Odisha 1 2
Jharsuguda Angul
765/400/33 765/400
1 2 3 4 5 6
Bisra Bolangir Indravati Jaypore Kaniha Keonjhar
400/220 400/220/33 400/220/33 400/220/33 400/220 400/220/33 400/220
7
Kuchei/Baripada
400/220 220/132 400/220
8
Mendhasal
9
Meramundali
10 11 12 13
Rengali New Duburi Sterlite Pandiabil
220/132 220/33 400/220 220/132 132/33 400/220 400/220 400/220 400/220
1
Atri
2
Balasore
3
Bhadrak
4
Bidanasi
5
Bolangir new
56
PRDC Bangalore
220/132 220/132 132/33 132/33 220/132 132/33 132/33 220/132 220/132 132/33 132/33 220/132 132/33
765 kV Level 2 4 400 kV Level 2 2 2 2 2 2 2 1 2 2 2 1 2 3 1 2 2 2 2 220 kV Level 2 2 2 1 3 2 1 1 2 2 1 2 1
PGCIL
PGCIL
OPTCL PGCIL OPTCL PGCIL OPTCL SEL PGCIL
OPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
6
Budhipadar
7
Chandaka
8
Duburi
9
Jayanagar
10
Joda
11
Katapalli
12 13
Lapanga Mendhasal
14
Narendrapur
15
Paradip
16 17
Talcher (TTPS) Tarkera
18
Theruvali
19
Bhanjanagar
20
Puri (Samangara)
21
Balimela
22
Barkote
23
Nayagarh
57
PRDC Bangalore
Voltage level (kV) 220/132 132/33 132/33 220/132 220/132 132/33 132/33 220/132 220/33 132/33 220/132 132/33 132/33 220/132 132/33 132/33 220/132 220/132 132/33 132/33 220/132 220/132 220/132 220/132 132/33 132/33 220/132 220/132 220/132 132/33 132/33 220/132 220/132 220/132 132/33 220/132 220/132 132/33 220/33 220/33 220/33 220/33 220/33
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 2 1 1 2 2 2 1 3 2 1 2 2 1 3 3 1 1 2 1 2 2 2 1 2 2 1 1 1 1 2 1 2 4 2 2 2 1 2 1 1 2 1 2
160 20 12.5 100 160 63 40 100 40 5 160 20 12.5 100 20 40 160 100 40 20 160 100 100 160 40 20 160 50 100 20 12.5 160 100 100 12.5 160 160 20 20 40 40 40 20
Owned By
320 20 12.5 200 320 126 40 300 80 5 320 40 12.5 300 60 40 160 200 40 40 320 200 100 320 80 20 160 50 100 40 12.5 320 400 200 25 320 160 40 20 40 80 40 40
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
24 25 26
Name of the Substation
Voltage level (kV)
Laxmipur Rengali Cuttack(POPAR DA)
220/33 220/33
1 2
20 20
20 40
220/132
1
160
160
12.5 12.5 20 40 20 40 20 34 40 40 20 12.5 20 12.5 40 40 20 40 40 20 12.5 20 40 16 12.5 63 20 12.5 20 40 12.5 40
25 25 20 80 20 80 20 34 120 40 20 12.5 40 25 120 120 20 40 80 20 12.5 20 80 16 25 189 20 25 20 80 12.5 40
20 12.5 40 20 20 12.5
60 12.5 80 20 60 25
1
Akhusingh
2
Anandapur
3
Angul
4
Argul
5 6
Atri Aska
7
Balugaon
8 9 10 11
Banki Barbil Baragarh Baripada
12
Barpalli
13
Berhampore
14
Basta
15
Bhanjanagar
16 17
Bhawanipatna Bhubaneswar
18
Boinda
19
Boudh
20
Bolangir
21
Brajrajnagar
22
Chainpal
23 24
Chandikhole Chhandpur
58
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA)
PRDC Bangalore
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
132 kV Level 2 2 1 2 1 2 1 1 3 1 1 1 2 2 3 3 1 1 2 1 1 1 2 1 2 3 1 2 1 2 1 1 3 1 2 1 3 2
Owned By
OPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA)
SI.No
Name of the Substation
Voltage level (kV)
25 26
Chhatrapur Chhend
27
Choudwar
28 29
Cuttack Dabugaon
132/33 132/33 132/33 132/33 132/33 132/33
3 3 1 2 3 2
20 40 20 40 40 12.5
60 120 20 80 120 25
30
Dhenkanal
132/33
3
40
120
31
Digapahandi
32
Ganjam
33
Jagatsinghpur
34
Jajpur road
35
Jajpur town
36
Jaleswar
37 38
Jharsuguda Junagarh
39
Kalarangi
40
Kalugaon
41
Kamakshyanagar
42
Karanjia
43
Kendrapara
44
Kesinga
45
Kesura/Badagad a
46 47 48 49 50 51 52 53
Khariar Khurda Konark Kuchinda Lapanaga Mania Marshaghai Mohana
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
54
Nimapara
132/33
2 1 2 2 1 2 1 2 1 2 1 1 3 2 1 2 1 2 2 1 2 1 1 2 1 1 2 3 2 2 1 1 2 2 2 1
20 12.5 12.5 20 40 40 20 40 20 31.5 12.5 40 20 12.5 20 40 20 12.5 12.5 20 40 12.5 40 20 63 40 40 40 20 20 20 12.5 20 12.5 40 12.5
40 12.5 25 40 40 80 20 80 20 63 12.5 40 60 25 20 80 20 25 25 20 80 12.5 40 40 63 40 80 120 40 40 20 12.5 40 25 80 12.5
59
PRDC Bangalore
Owned By
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
55
Nuapara
56
Nuapatna
57 58
Padampur Parlakhemundi
59
Patnagarh
60
Pattamundai
61
Phulbani
62
Phulnakhara
63
Polasapanga
64 65 66
Puri Purusottampur Rairakhole
67
Rairangpur
68
Rajgangpur
69
Ranasinghpur
70
Rayagada
71
Rourkela
72
Saintala
73
Salipur
74
Sambalpur
75 76
Shamuka Somnathpur
77
Sonepur
78
Soro
79
Sunabeda
80
Sundargarh
81
Tentulikhunti
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/25 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
60
PRDC Bangalore
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 2 1 1 1 1 3 1 2 2 1 2 1 2 1 2 3 2 2 2 1 3 2 1 2 4 1 1 1 2 1 2 1 2 1
20 40 20 12.5 20 12.5 40 20 20 12.5 12.5 40 20 40 20 40 12.5 12.5 20 12.5 40 63 40 12.5 35 12.5 10 12.5 20 12.5 31.5 40 31.5 12.5
3
20
1 2 3 1 1 1 2
40 20 12.5 40 20 20 12.5
Owned By
40 40 20 12.5 20 37.5 40 40 40 12.5 25 40 40 40 40 120 25 25 40 12.5 120 126 40 25 140 12.5 10 12.5 40 12.5 63 40 63 12.5 60 0 40 40 37.5 40 20 20 25
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
82 83 84 85
Tarkera Umerkote Bolani Brajrajnagar
86
Jharsuguda
132/33 132/33 132/11 132/11 132/11 132/11
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 1 2 2 1 1 1
Owned By
12.5 20 10 12.5 20 12.5
12.5 40 20 12.5 20 12.5
315 100
1575 300
50 50 20 20
100 100 20 20
5 2.5 10 10 5 5 2.5 10 7.5 15 5 2.5 5 2.5 2.5 2.5 7.5 10 5 5 5 7.5 7.5 5
5 2.5 20 20 5 15 5 10 7.5 15 10 5 5 5 5 5 15 10 5 5 10 15 7.5 5
Sikkim Gov
315
1260
WBSETC
Sikkim
1
Rangpo
440/220 220/132
1 2 3 4
Gangtok Melli Geyzing Rangit
132/66 132/66 132/66 132/66
1
Phodong
66/11
2
Bulbuley
66/11
3
Sichey
66/11
4 5
Tadong Rongly
66/11 66/11
6
Mamring
66/11
7 8 9 10 11 12 13 14 15 16 17 18
Melli Namchi Rabangla Rothak Soreng Geyzing Purano Namchi Pakyong Pelling Rhenock Mangan Ranipool
19
Topakhani
66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11
400kV Level 5 3 132kV Level 2 2 1 1 66kV Level 1 1 2 2 1 3 2 1 1 1 2 2 1 2 2 2 2 1 1 1 2 2 1 1
PGCIL
PGCIL Sikkim Gov
West Bengal 1
Arambagh
61
PRDC Bangalore
400/220
400 kV Level 4
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA)
220/132 132/33 400/220 220/132/33
3 3 4 3
160 50 315 160
480 150 1260 480
400/220
2
315
630
400/220 220/132 400/220
3 2 2
315 160 315
945 320 630
220/33
1
50
50
Owned By L
2
Jeerat
3
Bidhannagar (Durgapur WBSETCL)
4
Kharagpur
5
Bakreswar
6 7 8 9
400/220 400/220 400/220 400/220
2 2 2 2
315 315 315 315
630 630 630 630
400/220
2
315
630
11
Kolaghat TPS Sagardighi Binaguri Malda Parulia (Durgapur PG) Farakka
400/220
12
Subhashgram
400/220
2 4 1
315 315 500
630 1260 500
13
Alipurduar_ HVDC
400/220
2
315
630
PGCIL
14
Gokarna
400/220
2
315
630
WBSETC L
160 160 50 160 31.5 160 31.5 20 160 50 160 100 50 160 50 160 150 20 150 160
160 160 150 480 63 320 31.5 40 320 100 320 100 150 640 150 480 150 40 300 320
WBSETC L
10
1
Asansol
2
New Bishnupur
3
Dalkhola
4
Dharampur
5
Domjur
6
Gokarna
7
Howrah
220/132 132/33 220/132 132/33 220/132 132/33 220/132 132/33 220/132 132/33 220/132 132/33 220/132 132/25
8
Kasba
62
PRDC Bangalore
220/132
220 kV Level 1 1 3 3 2 2 1 2 2 2 2 1 3 4 3 3 1 2 2 2
WBPDCL WBSETC L WBPDCL
PGCIL NTPC PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
9
Krishnagar
Voltage level (kV) 220/132/33 132/33 220/132
10
Laxmikantpur
132/33 132/25 220/132 132/33 220/132 132/33 220/132 220/33 220/132 132/33 220/132
11
New Haldia
12
New Jalpaiguri
13
New town action area-III
14
Rishra
15
Satgachia
16
Subhashgram
220/132 132/33
17
KTPS 400 kV
220/132
132/33
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 2 2 1 3 1 2 2 2 2 2 2 2 2 3 4 2 2 1 2 2 1 2 1 1 2 1 2 2 2 1
160 50 31.5 160 31.5 50 12.5 160 50 160 50 160 50 160 50 160 50 31.5 160 31.5 160 150 130 100 160 50 160 160 160 100
320 100 31.5 480 31.5 100 25 320 100 320 100 320 100 480 200 320 100 31.5 320 63 160 300 130 100 320 370 640 320 320 100
19
STPS (Santhaldih) Birpara
20
Malda
220/132
21
Siliguri
220/132
22
DPL
220/132
23
Bidhannagar(Dur gapur)
220/132
3
200
600
24
Hura
25
Foundry park
26
Midnapur
27
Kolkata leather complex(CLC)
28
Vidyasagar Park
29 30 31 32
Sadaipur Egra EMSS BBGS
220/132 132/33 220/132/33 132/33 220/132 132/33 220/132 132/33 220/132 132/33 220/132/33 200/132/33 220/132 /33 220/132 /33
2 2 2 2 3 2 2 3 2 2 2 2 5 2
160 50 160 50 160 50 160 50 160 50 160 160 160 160
320 100 320 100 480 100 320 150 320 100 320 320 800 320
18
63
PRDC Bangalore
220/132 220/132
Owned By
WBPDCL WBPDCL
PGCIL
DPL
WBSETC L
CESC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
33
NCSS
34
Waria (DTPS)
220/132 /33 220/132/33 132/33 132/25
35
Durgapur/ Muchipara
36
Parulia
37
Barjora
38 39
Mejia Burnpur
220/33 220/33
1
Adisapthagram
132/33 132/25
2
Alipurduar
220/33 220/33 132/33 220/132 220/33
132/66 132/33
3
Amtala
4
Asoknagar
5 6 7 8 9 10 11 12 13 14 15
Bagnan GIS Bagmundi Balurghat Bankura Barasat Behala/Joka Basirhat Belmuri Berhampore Bighati Birsingha
16
Bishnupur (Old)
17 18 19 20
Bolpur Bongaon Barjora Chanditala Chandrakora road Contai Coochbehar
21 22 23
64
PRDC Bangalore
132/33 132/33 132/25 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 2 3 3 2 2 1 2 1 2 1 1 1 2 2 132 kV Level 3 2 2 1 2 1 1 3 2 2 2 4 2 3 3 2 2 3 2 2 1 1 3 3 2 2 1 1 2 3
160 150 50 25 80 50 80 50 150 100 80 50 35 50
320 450 150 50 160 50 160 50 300 100 80 50 70 100
50 20 16 20 31.5 31.5 50 50 7.5 50 20 12.5 50 50 50 50 31.5 50 50 50 50 31.5 50 31.5 31.5 50 50 31.5 50 50
150 40 32 20 63 31.5 50 150 15 100 40 50 100 150 150 100 63 150 100 100 50 31.5 150 94.5 63 100 50 31.5 100 150
Owned By
DVC
WBSETC L
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
24
Darjeeling
132/33
25
Debogram
132/33
26 27
Dhulian Egra
132/33 132/33
28
Falta
132/33
29
Gangarampur
132/33
30
Haldia
31
Haldia NIZ
32
Hizli
33
Jangipara
132/25 132/33 132/33 132/25 132/33
34
Jhargram
132/33
35 36
Kurseong Kakdwip
132/33 132/33
37
Kalingpong
132/66
38
Kalan
132/33
39
Kalyani
132/33
40
Khatra
132/33
41
Katwa
132/33
42
44
Khanyan Kharagpur WBIIDC Khejuria GIS
45
Kolaghat
46
Lalgola
47
Lilooah
48
Mahachanda
132/33
49
Mathabhanga
132/33
50 51
Malda Mankar
132/33 132/33
52
Maynaguri
132/33
43
65
PRDC Bangalore
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 10 20 31.5 50 31.5 50 31.5 50 20 12.5 50 31.5 30.24 31.5 50 10 31.5 31.5 50 10 31.5
30 20 31.5 50 63 150 63 50 60 12.5 50 31.5 60.48 63 100 20 63 31.5 50 30 63
132/33
3 1 1 1 2 3 2 1 3 1 1 1 2 2 2 2 2 1 1 3 2 MVA rating not given 2 1 1 2 1 2 2
31.5 31.5 50 50 31.5 50 31.5
63 81.5 150 100 31.5 100 63
132/33
2
31.5
63
132/33 132/33 132/25 132/33 132/33 132/25
2 3 2 2 3 2 1 2 1 1 3 3 1 1
50 50 12.5 31.5 50 20 31.5 50 50 31.5 50 31.5 31.5 50
100 150 25 63 150 40 31.5 100 50 31.5 150 94.5 31.5 50
132/33
Owned By
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
54 55 56
North Bengal university (NBU) Najirpur New town AA 1 Pingla
57
Purulia (WB)
53
Voltage level (kV)
132/33 132/33 132/33 132/33 132/33 132/25
58
Raghunathganj
132/33
59
Raghunathpur
132/33
60
Raigunj
132/33
61 62
Raina Rampurhat
63
Ranaghat
132/33 132/33 132/33 132/66 132/25
64 65 66
Sainthia Salt lake Salt lake GIS
132/33 132/33 132/33
67
Samsi
132/33
68
Siliguri
69
Sonarpur
70 71
Serakol Tamluk
132/33 132/33 132/25 132/33 132/33
72
Tarakeswar
132/33
73
Titagarh
74 75 76 77
Ukhra Uluberia Kuli Birpara
78
Chalsa
79 80 81
Bajkul Food Park Belur
66
PRDC Bangalore
132/33 132/25 132/33 132/33 132/33 132/66 132/66 132/33 132/33 132/33 132/33
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 2 2 1 2 2 3 2 1 2 2 2 2 1 2 2 3 2 2 2 1 1 2 3 2 2 1 2 3 2 2 2 1 1 3 2 2 3 2 3 1 1 2 2 2 3
30 31.5 50 31.5 50 50 31.5 20 12.5 31.5 50 31.5 31.5 20 12.5 50 50 50 31.5 12.5 10 50 50 50 31.5 50 50 31.5 20 50 50 31.5 50 50 20 50 50 50 20 20 10 20 50 50 50
60 63 50 63 100 150 63 20 25 63 100 63 31.5 40 25 150 100 100 63 12.5 10 100 150 100 63 50 100 94.5 40 100 100 31.5 50 150 40 100 150 100 60 20 10 40 100 100 150
Owned By
CESC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
Voltage level (kV)
82
BT Road
132/33
83
B.Garden
132/33
84 85
Titagarh (TRS) Dum Dum
132/33 132/33
86
Park lane
132/33
87 88
Jadavpore Chakmir
132/33 132/33
89
Majerhat
132/33
90
BBD Bag
132/33
91
PRS
132/33
92
East Calcutta
132/33
93
NCSS
132/33
94
SRS
132/33
95 96 97
Patuli Park Circus WBRS
98
A Zone
99
B Zone
100
AB Zone
132/33 132/33 132/33 132/11 132/11 132/33 132/33 132/11 132/33 132/33 132/33 132/11
101
C Zone 132/33
102
C1 Zone
103
Bamunara SS
104
Kalipahari
105
Kharagpur
132/11 132/33 132/33 132/33 132/33 132/11
106
Burdwan
132/33
107
Belmuri
132/33
67
PRDC Bangalore
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 2 1 1 5 2 1 1 3 2 2 1 1 1 1 1 1 3 1 1 2 1 2 2 2 1 1 1 1 5 1 1 1 1 2 1 1 2 2 2 1 2 1 2 1 1
75 50 100 50 75 75 50 75 55 75 50 68 69 50 75 100 75 50 75 55 75 75 75 75 20 31.5 31.5 50 31.5 31.5 50 50 31.5 20 31.5 50 31.5 50 50 50 80 7.5 50 80 50
150 50 100 250 150 75 50 225 110 150 50 68 69 50 75 100 225 50 75 110 75 150 150 150 20 31.5 31.5 50 157.5 31.5 50 50 31.5 40 31.5 50 63 100 100 50 160 7.5 100 80 50
Owned By
DPL
DVC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
SI.No
Name of the Substation
108
Purulia
109
ASP
110 111
Jamuria Howrah
68
PRDC Bangalore
Voltage level (kV)
132/25 132/33/11 132/33/11 132/33 132/33 132/33
Substation details Capacity Total of each No. of units capacity unit (MVA) (MVA) 1 2 1 2 2 2 3
31.5 25 50 50 50 50 50
Owned By
31.5 50 50 100 100 100 150
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table B: State wise list of transmission lines present in eastern region grid Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
Owned By
341.0 61.3 228.0
Quad-Bersimis Quad-Bersimis Quad-Bersimis
PGCIL
126.0 272.0 76.0 215.0 81.0 192.0 203.5 95.0 95.0 172.0 89.0 102.5 145.0 48.0 217.0 111.0 184.0 242.0 132.0 321.0 232.0 93.0 69.0 195.0 180.0 347.0 261.0 240.0 167.0 168.0 72.0 98.0 349.0 63.3
Twin-Moose Quad-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Quad-Moose Quad-Moose Twin-Moose Quad-Moose Twin-Moose Quad-Moose Quad-Moose Quad-Moose Quad-Moose Quad-Moose Quad-Moose Quad-Moose Quad-Moose Quad-Moose Twin-Moose Twin-Moose Quad-Moose Quad-Moose Quad-Moose Twin-Moose
0.5
Zebra
Bihar 1 2 3
Gaya to Varanasi Sasaram to Fatehpur line I Gaya to Ballia
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Gaya to Koderma Gaya to Maithon Sasaram to Sarnath Sasaram to Allahbad Sasaram to Nabinagar Biharshariff to Sasaram Biharshariff to Sasaram Kahalgaon to Farakka I & II Kahalgaon to Farakka III & IV Kahalgaon to Maithon Biharshariff to Lakhisarai Biharshariff to Lakhisarai Lakhisarai to Kahalgaon Kahalgaon to Banka Kahalgaon to Barh Biharshariff to Koderma Biharshariff to Banka Biharshariff to Balia Biharshariff to Muzaffarpur Biharshariff to Varanasi Biharshariff to Purnea Barh to Patna I & II Barh to Patna III &IV Patna to Balia Patna to Balia Patna to Kishanganj Muzaffarpur to Gorakhpur Purnea to Muzaffarpur Malda to Purnea Purnea to Binaguri I & II Purnea to Kishanganj Kishanganj to Binaguri Barh II to Gorakhpur Muzaffarpur to DMTCL
1
Patna PG to Sipara
765 kV D/C S/C S/C 400 kV D/C D/C S/C D/C D/C S/C S/C D/C D/C D/C S/C S/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C D/C 220 kV D/C
2
Dehri to Pusauli
S/C
65.0
Zebra
3 4
Pusauli to Sahupuri (UP) Arrah to Khagaul
S/C D/C
71.0 50.0
Zebra Zebra
69
PRDC Bangalore
PGCIL
Power Links
PGCIL
DMTCL BSPHCL BSPHCL & PG PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
5
Patratu to Bodhgaya
T/C
136.0
Zebra
6
Patna PG to Khagaul
S/C
30.5
Zebra
7
Tenughat to Biharshariff
S/C
182.0
Twin-Moose
8
Biharshariff (PG) to Biharhariff (BSPHCL)
T/C
1.7
Zebra
9
Muzaffarpur to MTPS (Kanti)
D/C
24.0
Zebra
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
Dehri to Gaya (PG) Bodhgaya to Gaya (PG) Muzaffarpur to Hazipur - I & II Biharshariff to Fatua Biharshariff to Bodhgaya Purnea to Dalkhola (WB) Sipara to Khagaul MTPS (Kanti) to Gopalganj MTPS (kanti) to Darbhanga Purnea (PG) to Madhepura Biharsariff to Begusarai MTPS to Begusarai Amnour(Chhapra) to Hajipur Patna (PG) to Fatuha MTPS to Motipur Motipur to Mushahri Motipur to DMTCL Mushahri to Darbhanga Sipara to Fatuha Pusauli (PG) to Pusauli new Pusauli new to Ara (PG) Pusauli (PG) to Ara (PG) Purnea (PG) to Purnea old Kishanganj to Siliguri Kishanganj to Dalkhola PG
95.0 17.0 53.0 40.0 80.0 41.0 39.0 101.4 68.5 100.1 75.0 152.0 50.0 27.6 56.8 88.7 68.5 57.9 26.0 1.7 116.0 112.0 2.0 108.0 31.0
Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra
1 2 3 4 5 6 7 8 9 10 11 12
Kahalgao to KhSTPP KhSTPP to lalmatya Arrah (PG) to Arrah BS Arrah (PG) to Dumraon Purnea (PG) to Purnea (BS) Purnea (OLD) to Kishanganj Karmansa to Sahupuri Karmansa to Chandauli Sonenagar to Rihand Japla to Sonenagar Kahalgao to Sabour Kahalgao to Lalmatia
D/C D/C D/C D/C D/C D/C S/C D/C S/C D/C D/C D/C D/C S/C D/C D/C D/C D/C S/C S/C S/C S/C D/C D/C D/C 132 kV S/C S/C S/C S/C T/C S/C S/C S/C S/C S/C S/C S/C
6.0 47.0 2.1 61.5 1.3 70.0 131.0 25.0 188.0 56.0 19.0 60.0
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
70
PRDC Bangalore
Owned By
BSPHCL & JSEB BSPHCL BSPHCL & JSEB BSPTCL POWER LINKS BSPHCL & PG BSPTCL PGCIL
BSPTCL
PGCIL
PGCIL
BSPTCL
BSPHCL & UPPCL BSPTCL PGCIL NTPC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
13 14 15 16 17 18 19 20 21 22 23 24
Banka to Sabour Banka (PG) to Banka (New) Chandauti to Sipara Chandauti to Belaganj Belaganj to Jehanabad Jehanabad to Masaudhi Masaudhi to Sipara Jehanabad to Ataula Chandauti to Sonenagar (L - 30) Chandauti to Rafiganj (L - 31) Rafiganj to Sonenagar (L - 31) Chandauti to Tekari Bodhgaya to Chandauti (Gaya)(Line - I) Bodhgaya to Chandauti (Gaya) (Line - II) Tekari to Goh Bodhgaya to Wazirganj Wazirganj to Nawada Bodhgaya to Sherghati Bodhgaya to Imamganj Dehri to Banjari Dehri to Sasaram Ckt. - I Sasaram to Kudra Ckt. - I Kudra to Karamnasa Ckt.- I Dehri to Pusauli PG Ckt - II Pusouli PG to Mohania Ckt. - II Mohania to Pusauli BS Mohania to Karmnasa Ckt. - II Dehri to Bikramganj Ckt. - II Bikramganj to Dumroan Ckt. - II Dumroan to Buxar Ara (PG) to Jagdishpur Fatuha to Sipara Sipara to Mithapur Mithapur to Jakkanpur Gaighat to Mithapur Fatuha to Gaighat Fatuha to Katra Biharsarif (SG) to Barh Ckt. - I Barh to Hathidah Ckt. - I Biharsarif (SG) to Hathidah Ckt. II Biharsarif (SG) to Ekangarsarai Ekangarsarai to Hulasgarh Baripahari to Harnaut Motipur to motihari
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56
71
PRDC Bangalore
Ckt type
Distance (km)
Conductor Type
S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C
40.7 12.5 90.0 20.0 30.0 30.0 24.0 28.0 76.0 41.0 35.0 28.9
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
D/C
16.0
Panther
D/C
14.0
Panther
S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C
22.0 30.0 26.0 27.0 56.0 38.0 20.0 13.0 10.0 26.0 10.0 15.0 11.0 45.0 35.0 16.1 26.3 26.0 16.0 1.0 5.0 23.0 17.0 25.0 20.0
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
S/C
32.5
Panther
S/C S/C S/C S/C
30.0 14.5 26.0 45.0
Panther Panther Panther Panther
Owned By
BSPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
57
Motipur to MTPS
S/C
24.2
58
Harnaut to Fatuha
S/C
45.0
S/C
142.0
Panther
S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C
16.0 126.0 41.0 28.0 28.0 35.0 39.5 49.0 45.0 38.0 19.7 30.0 31.0 105.0 25.0 70.0 136.0 150.0 60.0 29.0 101.2 85.0 26.0 88.6
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
S/C
50.9
Panther
S/C S/C S/C S/C S/C
50.0 50.0 50.4 57.0 34.0
Panther Panther Panther Panther Panther
S/C
23.0
Panther
S/C S/C S/C S/C
15.5 16.7 14.1 40.0
Panther Panther Panther Panther
S/C
92.0
Panther
S/C S/C D/C S/C
30.0 40.0 30.1 70.0
Panther Panther Panther Panther
Biharsarif (SG) to Barhi (DVC) (L 28) Barhi (DVC) to Rajgir (L - 29) Rajgir to Biharsarif (L - 29) Biharsarif (SG) to Nawada Hathidah to Lakhisarai Hathidah to Shekhpura Lakhisarai to Jamui Biharsarif (SG) to Shekhpura Shekhpura to Jamui Lakhisarai to Jamalpur Sultanganj to Jamalpur Sultanganj to Tarapur Sabour to Sultanganj Ckt I Sabour to Sultanganj Ckt II Sultanganj to Deoghar KhSTPP to Sabour Purnia(bs) to Naugachia (L - 16) Naugachia to BTPS (L- 16) Purnia(bs) to Khagaria (L - 23) Khagaria to BTPS (L - 23) Purnia(BS) to Katihar Purnia(BS) to Saharsa Purnia (BS) to Farbisganj Kishanganj to Dalkola (WB) Kishanganj to Farbisganj Farbisganj to Kataya (Kosi) Ckt. II (Old) Madhepura to Saharsa Madhepura to Sonebarsa Saharsa to UdaKishanganj Begusarai to Samastipur (L - 9) Begusarai to Dalsingsarai (L - 10) Dalsingsarai to Samastipur (L 10) KBUNL to Muzaffarpur Ckt - I KBUNL to Muzaffarpur Ckt - II KBUNL to SKMSH Samastipur to Darbhanga Samastipur to Hazipur LILO at Jandaha Hazipur to Sheetalpur Chapra to Sheetalpur Muzaffarpur to Vaishali Chapra to Siwan
59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99
72
PRDC Bangalore
Conductor Type
Owned By
Panther Panther BSPTCL & DVC
BSPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
100
Chapra/Siwan to Ekma
S/C
0.6
101 102
Gopalganj to Hathua Hathua to Siwan
S/C S/C
25.0 40.0
103
Gopalganj to Siwan
S/C
40.0
104 105
Gopalganj to Masrakh to Siwan Gopalganj to Bettia Gopalganj/Bettia Ckt- I LILO at Sidhwalia SM Betiya to narkatiyaganj MTPS to Motihari Bettia to Motihari Bettia to Ramnagar Bettia to Raxaul Ramnagar to BHPC, Valmikinagar BHPC, Valmikinagar to Nepal (Surajpura) Motihari to Dhaka Mushahri to Sitamarhi Mushahri to SkMCH Dhaka to Sitamarhi Sitamarhi to Runisaidpur(Reminagar) Runisaidpur to SKMCH SKMCH to Muzaffarpur Darbhanga (220 kV) to Darbhanga (132 kV) Darbhanga to Phoolparas Pandaul to Madhubani Madhubani to Jainagar Jainagar to Phoolparas Barauni TPS to Begusarai (L - 9 & L - 10) BHPC Kosi (Kataiya) to Duhabi (Nepal) Biharshariff (BSEB) to Baripahari Dehri to Sonenagar Khagaul to Bihta Khagaul to Digha Samastipur to MTPS (Kanti) Sheetalpur to Vaishali Sonenagar to Aurangabad Supaul to Phulparas Madhepura to Supaul Biharshariff to Hullasgarh Ara to Ara TSS Dumroan to Dumroan TSS Rafiganj to Rafiganj TSS
S/C D/C
74.9 60.8
Panther Panther
S/C
12.0
Panther
S/C S/C S/C S/C D/C S/C
35.5 70.0 45.0 41.5 37.1 77.8
Panther Panther Panther Panther Panther Panther
S/C
7.2
Panther
S/C D/C S/C S/C
24.0 63.0 21.0 52.0
Panther Panther Panther Panther
S/C
21.0
Panther
S/C S/C
35.0 15.0
Panther Panther
S/C
1.0
Panther
S/C S/C S/C S/C
71.8 16.0 40.0 55.0
Panther Panther Panther Panther
D/C
10.0
Panther
D/C
3.5
Panther
D/C D/C D/C D/C D/C D/C D/C D/C D/C S/C S/C S/C S/C
5.0 14.5 14.5 16.0 85.2 30.2 21.0 31.9 30.0 40.0 4.0 2.0 4.6
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140
73
PRDC Bangalore
Conductor Type
Owned By
Panther Panther Panther Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
141
Barh/Hathidah line to Mokama TSS
S/C
6.0
142 143 144
Lakhisaai to Lakhisarai TSS Khagaul to Khagaul TSS Fatuha to Khusrupur TSS
S/C S/C S/C
6.0 1.0 7.2
145
Chapra to Chapra TSS
S/C
1.0
146
Hazipur to Hazipur TSS Lakhisari PG to Lakhisarai BSPTCL Chandauti to Tehta Tehta to Jehanabad Sipara to Jakkanpur Farbisganj to Kataya Ckt. - I (New) Supaul to Kataya Samastipur to Hazipur (220 kV) Bodhgaya to Paharpur TSS Jamui to Jhajha TSS Lakhisari PG to Jamui Dehri to Kudra kudra to Pusauli Kudra to kochas Banjari to KCL Khagaul to Fatuha Begusarai to Khusweshthan Fatuha to Birpahari Nalanda to (L - 28) LILO Point (L - 28) Line to Rajgir grid (T Connection) Muzaffarpur to SKMCH Sasaram to Banjari Tehata to Belaganj Aurangabad to Shree Cement Kahalgaon (BSPTCL) to Sultangunj Darbhanga to Gangwara GSS Gangwara GSS to Pandaul Kisanganj to Forbesganj Circuit- 2 Forbesganj to Kataiya Circuit- 3 Mithapur to Karbighaia Dehri to Kochas Kochas to Dumraon Circuit- 1 Banka (PG) to Sultanganj
S/C
2.0
Panther
D/C
15.3
Panther
D/C D/C D/C
15.0 40.0 18.0
Panther Panther Panther
D/C
39.7
Panther
D/C D/C D/C D/C D/C S/C S/C S/C S/C S/C S/C S/C D/C
59.6 70.0 35.0 31.0 25.3 46.0 25.0 27.0 1.0 35.0 65.5 42.0 2.0
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
S/C
6.0
Panther
S/C S/C S/C S/C
16.7 47.5 22.0 0.8
Panther Panther Panther Panther
D/C
63.5
Panther
D/C
7.3
S/C S/C S/C S/C S/C D/C
88.4 39.8 2.5
147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178
Conductor Type
Owned By
Panther
Panther Panther Panther Panther
46.0
Panther Panther Panther Panther Panther Panther Panther Panther
301.0
Qd Bermis
31.6
Jharkhand 1
Ranchi (New) to Dharamjaygarh
74
PRDC Bangalore
765 kV S/C
PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
2
Ranchi (New) to Dharamjaygarh
S/C
344.6
1 2 3 4 5 6
Chaibasa to Bisra (Rourkela) Jamshedpur to Chaibasa Jamshedpur to Bisra Jamshedpur to Mejia B Jamshedpur to Maithon Maithon to Mejia B
400 kV S/C S/C S/C S/C S/C S/C
131.0 46.0 182.0 168.0 153.0 97.0
7
Jamshedpur to DTPS
D/C
156.0
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Jamshedpur to Adhunik Jamshedpur to Parulia Jamshedpur to Baripada Jamshedpur to TISCO TISCO to Baripada Maithon to Maithon RB Maithon to Kahalgaon Maithon to Mejia B Maithon to Gaya Maithon to Durgapur Ranchi to Maithon RB Ranchi to Maithon Ragunathpur to Maithon Ranchi to Raghunathpur Ranchi to Sipat Ranchi to Rourkela Ranchi to Ranchi (New) Ranchi (New) to Chandwa (JK Pool) Koderma to Gaya Koderma to Biharshariff Koderma to BTPS Jharkhand pooling station (Chandwa) to Gaya
D/C S/C S/C S/C S/C D/C D/C D/C D/C D/C D/C S/C S/C S/C D/C D/C 2XD/C
0.3 177.0 141.0 39.0 116.0 31.0 172.0 84.0 277.0 70.7 188.0 200.0 52.9 169.2 405.0 145.0 78.6
Quad-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Quad-Moose Lapwing Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Quad-Moose
D/C
69.0
Quad-Moose
D/C D/C D/C
82.0 111.0 100.0
Quad-Moose Quad-Moose Twin-Moose
D/C
117.0
Quad-Moose
25 26 27 28 29
Conductor Type Qd Bermis
Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose Twin-Moose
1
Farakka to Lalmatia
220 kV S/C
79.0
Zebra
2
Ramchandrapur to Joda
S/C
130.0
Zebra
3
Chandil to Santadih (STPS)
S/C
98.0
Zebra
D/C
0.1
Zebra
S/C S/C S/C S/C D/C
30.0 78.4 64.0 180.0 35.0
D/C
42.0
Zebra Zebra Double Moose Double Moose Zebra Zebra
5 6 7 8 9
Jamshedpur PG to Ramchandrapur Ramchandrapur to Chandil Chandil to Ranchi PG Tenughat to Patratu Tenughat to Biharsharif Ranchi PG to Hatia new
10
PTPS to Hatia new
4
75
PRDC Bangalore
Owned By
PGCIL
APNRL
PGCIL
PGCIL OPTCL & JSEB WBSETCL & JSEB
JUSNL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
11
Dumka to Rupnarayanpur PG (Maithon PG)
D/C
74.0
Zebra
12
Chaibasa PG to Chaibasa
D/C
0.7
Zebra
13
PTPS to Bodhgaya
T/C
136.0
Zebra
14 15 16 17 18
BTPS (DVC) to Ramgarh BTPS to CTPS Old CTPS B (New) to Dhanbad Jamshedpur DVC to BTPS Dhanbad to Kalyanaswari
D/C D/C D/C D/C D/C
54.6 31.8 45.6 150.0 79.2
Zebra Zebra AAAC Zebra Zebra Zebra Zebra
19
CTPS A (Old) to Kalyanaswari
D/C
141.8
DVC
20 21 22 23 24 25
Dhanbad to Giridih Jamshedpur DVC to Jindal (Joda) CTPS A (Old) to CTPS B (New) Giridhi to Koderma Dhanbad to Electro Steel BSL to CTPS A
44.4 135.0 2.6 100.9 58.6 9.0
AAAC Zebra Zebra AAAC Zebra AAAC Zebra AAAC Zebra AAAC Zebra
PGCIL DVC
1 2 3 4
2.0 8.3 22.0 34.5
Panther Panther Panther Panther
S/C
20.0
Panther
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
ABCIL to Garhwa Adityapur to Ramchandrapur Chakradharpur to Rajkharsawan Chandil 220 kV to Rajkharsawan Rajkharsawan to Chaibasa 132 kV Chandil 220 kV to Adityapur Chandil 220 kV to Golmuri Chandil 220 kV to Chandil 132 kV Deoghar to Sultanganj Deogarh to Jamtara Jamtara to Madupur Deoghar to Shankarpur Rly Deoghar to Dumka 220 kV Dumka 132 kV to Lalmatiya Goielkera to Goielkera Rly Goielkera to Rajkharsawan Gumla to Kamdara Kamdara to Hatia Old Garhwa to Japla Hatia old to Sikadari Hatia old to HEC Hatia New to Lohardanga Chaibasa 132 kV to Kendposi Jadugoda to Golmuri
D/C S/C D/C D/C D/C D/C 132 kV S/C D/C D/C S/C
S/C D/C S/C S/C D/C D/C S/C D/C D/C S/C S/C S/C S/C S/C S/C D/C D/C S/C S/C
16.0 30.0 1.0 92.0 75.0 54.0 11.0 68.0 96.0 0.5 55.0 62.0 61.0 50.0 46.0 8.0 62.0 30.0 22.0
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Zebra Panther Panther
25
Lalmatia to Kahalgaon TPP
S/C
47.0
Panther
26
Kendposi to Noamndi
S/C
28.0
Panther
5
76
PRDC Bangalore
Owned By
BSPHCL & JSEB
JUSNL
POWERGRI D JSEB
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
Owned By
27
Kendposi to Joda
S/C
42.0
Panther
JUSNL & OPTCL
28 29 30
Lalmatia to Sahebgunj Lohardanga to Latehar Latehar to Daltonganj
S/C D/C D/C
49.0 56.0 64.0
Panther Zebra Zebra
JUSNL
31
Maithon DVC 132 kV to Jamtara
S/C
25.0
Panther
DVC & JSEB
32 33 34 35 36
PTPS to Hatia Old Hatia old to Kanke Kanke to PTPS Rajkharsawan to Adityapur Saljhagiri Rly to Golmuri
S/C S/C S/C S/C S/C
44.0 28.0 28.0 36.0 4.0
37
Sikkidri (pooling point of SHPS) to Namkum
Zebra Zebra Zebra Panther Panther Panther
S/C
34.0
S/C S/C S/C D/C D/C S/C
27.0 49.6 8.0 3.5 71.0 85.0
Panther Panther Panther Panther Zebra Panther
S/C
4.0
Panther
45
Namkum to Hatia new Sonenagar to Japla Tolra Rly to Garhwa UMI to Adityapur Gumla to Lohardaga Dumka to Pakur Ramchanderpur to APL (Odisha minerals) DVM to DVM Railway
D/C
0.5
Panther
46
PTPS to Patratu DVC
D/C
6.4
Panther
47
Chandil 220 kV to Tamar
S/C
50.0
Panther
48
Garwa to Rihand
S/C
106.0
Panther
49 50 51 52 53 54 55 56
D/C S/C S/C D/C D/C D/C S/C S/C
0.5 15.0 35.0 15.0 15.0 10.0
Panther Panther Panther Panther Panther Panther Panther Panther
S/C
1.0
Panther
S/C
7.0
Panther
59
Hatia New to Hatia Old Kamdara to Bakaspur Rly Kamdara to Bano Rly Kendiposi FD Stn to Kendiposi Lodhma Rly to Hatia Old Namkum to Tatisiloi Rly Noamundi to Kendiposi FD STN Goelkera to Manoharpur Sikkidri (Pooling point of SHPS) to SHPS - 1 Sikkidri (pooling point of SHPS) to SHPS - 2 Dumka 220 kV to Dumka 132 kV
D/C
2.0
Panther
60
Lalmatia to Sabour
S/C
46.6
Panther
61 62 63 64
Chandil to Manique (JSEB) Chandil to JUSCO Maithon (MHS) to Jamtara Barhi to Rajgir
D/C
1.0
65
Barhi to Nalanda
S/C
38 39 40 41 42 43 44
57 58
77
PRDC Bangalore
S/C S/C
Panther No details available 30.0 Lark 149.0 Lark Lark 138.0
JUSNL
JSEB & DVC JUSNL JSEB & UPPCL
JUSNL
BSPHCL & JSEB JSEB/DVC DVC/JSEB DVC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Ckt type
Distance (km)
D/C
12.5
CTPS A to Purulia DVC CTPS A to Ramkanali
D/C D/C D/C D/C S/C S/C D/C D/C D/C D/C S/C
36.5 20.1 6.9 82.0 23.0 61.0 36.0 29.0 30.0 59.6 60.0
78
Ramkanali to DTPS
S/C
73.0
79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97
BSL to CTPS A BSL (MSDS) to CTPS A Gola to Manique (DVC) Jamshedpur to Chandil Jamshedpur (DVC) to Mosabani Jamshedpur to TISCO KTPP to Koderma Koderma JSEB to Koderma DVC Konar to Hazaribhag Road Nimiaghat to Putki Nimiaghat to Giridhi (New) Giiridhi (New) to Giridhi (Old) Patherdhi to Putki Patherdhi to Sindri Pradhankhanda to Sindri Patherdhi to Maithon (MHS) Ramgarh to Gola Gola to SER Muri Ramkanali to Panchet Jamshedpur (DVC) to Purulia DVC Kalipahari to Kalyanswari Kalyanswari to MAL IMPEX FERRO Mosabani to JSEB (Dhalbhumgarh) Maithon (MHS) to Kumardubi Kumardubi to Panchet Ramgarh to ECR Barkakana Dhanbad to Govindpur Ramgarh to Patratu Ramgarh to Patratu
D/C D/C D/C D/C D/C
10.0 10.0 86.1 43.7 39.6
D/C D/C D/C D/C D/C
18.3 18.3 35.0 45.0 43.6
D/C D/C D/C D/C D/C D/C D/C
22.6 3.2 20.0 41.0 25.3 30.3 14.5
D/C
87.0
Lark
D/C
28.8
Lark
S/C
1.5
AAAC Panther
D/C
10.7
Lark
S/C S/C S/C D/C S/C S/C
4.9 9.6 10.0 24.0 30.4 28.0
Lark Lark Panther AAAC Panther Lark Lark
Sl.No
Transmission line
66 67 68 69 70 71 72 73 74
PTPS to Patratu DVC Patratu to JSPL Barhi to Hazaribhag Barhi to KTPP BTPS B to ECR Gomia BTPS B to Barhi BTPS B to Konar Barhi to Konar CTPS A to Gola
75
CTPS B to Putki
76 77
98 99 100 101 102 103 104 105 106 107
78
PRDC Bangalore
Conductor Type Lark No details available Lark Lark AAAC Panther Panther Lark Panther Lark Lark Lark Lark Lark AAAC Panther
Owned By
DVC
Lark Lark Lark Lark Lark DVC No details available Lark ACSR Panther Lark DVC AAAC Panther AAAC Panther No proper data available Lark Lark Lark AAAC Panther Lark Lark Lark
DVC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
108 109 110 111 112 113 114 115 116
North Karnpura to Patratu North Karnpura to E.C.Rly Putki to Balihari 132 kV Patherdih to Balihari CTPS B to Biada R/S CTPS A to Rajabera CTPS B to Jamuria Maithon (MHS) to Panchet Maithon (MHS) to Kalyanaswari
D/C D/C S/C S/C D/C D/C S/C S/C D/C
32.0 4.5 0.5 24.0 12.1 4.9 119.2 14.5 1.6
Lark Lark Lark Lark AAAC Panther Lark Lark Lark Lark
Owned By
Odisha 765 kV 1
Jharsuguda pooling station to Dharamjaygarh
D/C
151.0
2
Angul to Srikakulam
D/C
276.0
3
Angul to Jharsuguda pooling station
D/C
272.0
ACSR HexaZEBRA ACSR Quad Bersimis ACSR Quad Bersimis
PGCIL
400 kV ACSR Moose
1
Jaypore to Bolangir PGCIL
S/C
287.7
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Bolangir PGCIL to Angul Angul to Meramundali - I JITPL to Angul TSTPS to Angul Angul to Meramundali - II TSTPS to Meramundali GMR to Angul Meramundali to JSPL Meramundali to Vedanta (Sterlite) GMR to Meramundali Meramundali to Mendhasal Meramundali to New Duburi TSTPS to Rengali Baripada to Keonjhar Keonjhar PGCIL to Rengali
S/C S/C D/C S/C S/C S/C D/C D/C D/C S/C S/C D/C D/C S/C S/C
198.0 25.0 68.0 68.0 18.0 52.3 30.0 37.9 222.0 8.5 106.0 97.0 24.0 156.3 100.3
Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose Quad Moose Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose ACSR Moose Twin Moose
17
Baripada to Kharagpur
S/C
100.3
ACSR Moose
18 19
S/C S/C
D/C D/C
141.0 115.0 295.0 25.0 190.3 130.0 25.0 171.0 145.0
ACSR Moose ACSR Moose
23 24
Baripada to Jamshedpur Baripada to TISCO (DVC) Baripada to Pandiabil Pandiabil to Mendhasal Baripada to Duburi Dubri to Pandiabil Pandiabil to Mendhasal Bisra to TSTPS Bisra to Ranchi
25
Bisra to Chaibasa
S/C
131.5
20 21 22
79
PRDC Bangalore
S/C S/C S/C
PGCIL Jindal PGCIL GMR OPTCL PGCIL OPTCL PGCIL OPTCL OPTCL WBSETCL & OPTCL PGCIL
ACSR Moose ACSR Moose Twin Moose Twin Moose ACSR Moose ACSR Moose
OPTCL
PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
26 27 28
Bisra to Sterlite Sterlite to Raigarh Bisra to Raigarh
S/C S/C S/C
135.0 147.0 230.4
PGCIL& Sterlite
29
Bisra to Jharsuguda
D/C
145.3
30
Jharsuguda to Raigarh
S/C
110.0
31
Jharsugud to Indbarath
S/C
62.6
32 33 34 35 36
Ind Bharath to Raigarh Indravati PG to Rengali Indravati PG to Jaypore Indravati PG to Indravati OHPC Jaypore to Gazuwaka
91.0 356.0 72.0 4.0 225.0
37
TSTPS to Kolar
1450.0
HVDC
PGCIL
38
Bishra to Jamshedpur
S/C S/C S/C S/C D/C Double pole S/C 220 kV
ACSR Moose Twin Moose ACSR Moose ACSR Twin Moose ACSR Twin Moose ACSR Twin Moose Twin Moose ACSR Moose ACSR Moose ACSR Moose AAAC
181.4
ACSR Moose
LILO of Balasore to Duburi new S/C line at Bhadrak
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
80
PGCIL
OPTCL
1.4 70.0
1
Owned By
Zebra
Balasore to Bhadrak
S/C
Bhadrak to New Duburi Balasore to Baripada Budhipadar to Raigarh Budhipadar to Korba Budhipadar to ITPS Budhipadar to ITPS Budhipadar to Vedanta Budhipadar to Bhusan Budhipadar to SPS Budhipadar to Basundhara Budhipadar to Lapanga Lapanga to Katapalli Budhipadar to Tarkera Budhipadar to Aditya Aluminum Balimela to Upper Silleru Balimela to Balimela SC Duburi to New Duburi Duburi to NINL (Nilachal) New Duburi to Paradeep New Duburi to JSL New Duburi to Maithan Ispat Nigam Limited New Duburi to Rohit New Duburi to Balasore New Duburi to Visa New Duburi to Tata steel
S/C D/C S/C D/C D/C D/C D/C D/C D/C S/C D/C D/C D/C D/C S/C S/C D/C S/C D/C D/C
70.0 77.0 81.0 183.0 25.3 25.3 16.8 14.9 7.1 35.8 25.0 51.0 102.0 20.5 24.7 0.2 6.4 5.5 113.3 4.8
S/C
4.8
Zebra
MINL
S/C S/C S/C D/C
4.8 137.9 10.5 4.0
Zebra Zebra Zebra Zebra
Rohit OPTCL Visa
PRDC Bangalore
OPTCL Zebra Zebra Zebra AAAC MOOSE AAAC MOOSE ACSR MOOSE Zebra Zebra
Vedanta
Zebra Zebra Zebra Zebra Zebra Zebra Zebra ACSR+AAAC Zebra
OPTCL
JSL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
25 26 27 28 29 30
Meramundali to Dubri Meramundali to TSTPS Meramundali to TTPS Meramundali to NALCO Meramundali to Bhusan steel Meramundali to Bhanja nagar Mendhasal to Bhanja nagar Mendhasal to Nayagarh Nayagarh to Bhanja nagar
D/C D/C D/C D/C D/C D/C S/C S/C S/C
ACSR Zebra ACSR Zebra ACSR Zebra ACSR Zebra ACSR Zebra ACSR Zebra
32
Mendhasal to Chandaka
4
33 34
36 37 38 39
Meramundali to Bidanasi Bidanasi to Mendhasal Mendhasal to Atri Atri to Narendrapur Theruvali to Bhanja nagar Theruvali to Narendrapur Theruvali to Indravati Theruvali to Indravati
S/C S/C D/C S/C D/C D/C D/C D/C
95.6 42.0 11.2 11.5 2.4 139.0 135.0 69.0 68.6 6.04 & 7.26 92.3 31.1 16.0 120.0 171.5 196.0 86.0 91.0
40
Theruvali to Upper Kolab
S/C
123.0
Jaynagar to Laxmi pur Laxmi pur to Theruvali Theruvali to Jaynagar Jaya nagar to Upper Kolab Jaya nagar to Jaya nagar PGCIL (Jaypore) Jaya nagar to Balimela Jaya nagar to Balimela Joda to TTPS Joda to chaibasa Joda to JSPL JSPL to Jamshedpur (DVC) Joda to TSIL Joda to Ramchandrapur Katapalli to Bolangir Bolangir to Bolangir PG Laxmi pur to Aditya Alumina Laxmi pur to Utkal Alumina Paradeep to Essar steel Paradeep to IOCL Rengali PH to TSTPS TSTPS to TTPS Rengali PH to TTPS Rengali PH to NALCO
S/C S/C S/C D/C
53.5 70.0 123.0 6.0
D/C
7.7
Zebra
S/C D/C D/C S/C S/C S/C S/C S/C D/C S/C D/C D/C D/C S/C S/C S/C S/C S/C
92.0 93.0 154.0 90.0 12.0 126.0 7.3 130.0 117.8 3.0 16.9 14.1 9.0 6.2 29.5 34.5 70.0 62.7
Zebra Zebra Zebra Zebra
NALCO to TTPS
S/C
8.6
31
35
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
81
PRDC Bangalore
Owned By
Zebra ACSR Zebra Twin Moose Zebra Zebra Zebra Zebra AAAC Zebra AAAC Zebra Zebra
Zebra
OPTCL
Zebra
Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
D/C
1.0
Zebra
D/C
5.0
Zebra
S/C
34.7
S/C
115.0
S/C
102.0 30.0 15.0 10.0 6.0 22.0 45.9 7.4
16.0
67
Rengali Switching Station to Rengali PG Rengali Switching Station to Rengali PH Rengali Switching Station to Barkot Barkot to Tarkera Rengali Switching Station to Chandiposh Chandiposh to Tarkera Tarkera to Bisra PG Tarkera to RSP Vedanta to SEL Atri to Pandiabil (Uttara) Pandiabil (Uttara) to Samangara Cuttack to Bidanasi
1 2 3
Angul to MCL Nandira Angul to Boinda Angul to Chainpal
S/C D/C D/C D/C D/C D/C D/C 132 kV D/C S/C S/C
4
Angul to TTPS
S/C
59 60 61
62 63 64 65 66
5
LILO of TTPS to Duburi S/C line at Jambay Ferro Alloys TTPS to Jambay Ferro Alloys S/C Jambay Ferro Alloys Duburi
45.0
LILO of ICCL to Salipur S/C line at OCL
25.8
ICCL to Mania
6
Mania to OCL OCL to Salipur LILO at Kamakhyanagar LILO at Kalarangi LILO at OPCL TTPS to OPCL Kamakshya Nagar to OPCL S/C Kalarangi to Kamakhyanagar Duburi to Kalarangi Chainpal to FCI D/C Chainpal to Meramundali D/C Chainpal to TTPS 3 LILO of Chandaka to Choudwar S/C line at Bidanasi Choudwar to Bidanasi S/C
8 9 10 11
82
PRDC Bangalore
Zebra
Zebra Zebra Zebra Zebra Zebra Zebra Zebra Panther Panther Panther Panther
0.7 Panther
8.0
22. S/C
7
10.8 38.5 14.9
Owned By
5.0 35.0 1.0 13.0 23.0 24.0 40.0 36.0 20.0 7.0 7.8 3.0 6.8
Panther
OPTCL
Panther
Panther Panther Panther Panther
8.6
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Bidanasi to BPPL BPPL to Chandaka Choudwar to Kendrapara Road (Traction) LILO at Rawmeet LILO at Nuapatna Tap LILO at Arati steel Meramundali to Arati steel Nuapatna Tap Arti Steel Arti Steel to Rawmet Choudwar to Rawmet LILO at Maheswari LILO at ICCL Dhenkanal to Maheswari Maheswari to ICCL ICCL to Grid Steel (GSAL) Grid Steel (GSAL) to Choudwar Dhenkanal to Meramundali Dhenkanal to Joranda traction LILO at Ranasinghpur LILO at Kesura Chandaka to Ranasinghpur
12
13
14
15 16
17
Ranasinghpur to Kesura
Ckt type
19 20 21 22 23 24 25 26 27
28
29
83
S/C
S/C
S/C S/C S/C
S/C
4.6 8.8 11.0 66.0 20.0 22.3 27.5 4.9 28.0 23.5 2.0 1.9 43.8 19.4 1.3 23.6 26.4 43.2 62.0 36.5 36.5 5.5
Owned By
Panther
Panther
Panther
Panther Panther
Panther
Panther Panther Panther Panther
23.5 20.0 35.2 56.1
Panther Panther Panther
16.2
Panther
20.3 30.0 15.0
Panther Panther
Samangara to Nimpara
S/C
20.0
Khurda to Arugul Tap
S/C
15.0
Arugul Tap to Arugul
S/C
3.9
Arugul Tap to Shamukh
S/C
35.6
Shamukh to Puri
S/C
18.6
Khurda to Kaipadar traction
S/C
11.5
PRDC Bangalore
Conductor Type
35.0 10.0
Kesura to Nimpara Chandaka to Nimpara S/C Chandaka to Mendhasal S/C Mendhasal to Khurda S/C Chandaka to Bhubaneswar D/C LILO of Bhubaneswar to Cuttack S/C line at Phulnakhara Bhubaneswar to Phulnakhara S/C Phulnakhara to Cuttack Cuttack to Jagatsinghpur S/C Jagatsingpur to Paradeep S/C Jagatsingpur to Gorakhnath S/C (Traction) Nimpara to Konark S/C Puri to Nimpara S/C Puri to Samangara S/C
18
Distance (km)
Panther
Panther
Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
LILO at Balugaon
Distance (km)
LILO at Chandpur
2.3
31 32 33 34 35
S/C S/C S/C D/C D/C
68.6 5.0 30.0 54.2 18.0 19.4 19.6 86.0 15.0 12.0 5.8 13.9
36
Chatrapur to Rambha Traction
S/C
28.9 43.8
39 40 41
Chatrapur to Aska S/C LILO of Aska to Chatrapur S/C line at Purusottampur Chatrapur to Purusottampur S/C Purusottampur to Aska Aska to Bhanja nagar D/C Bhanja nagar to Phulbani S/C Aska to Berhampur S/C
42
Berhampur to Narendrapur
11.0
37 38
S/C
D/C
LILO of Berhampur to Mohanan S/C at Digapahandi Berhampur to Digapahandi S/C Digapahandi to Mohanan Narendrapur to Jagannathpur S/C traction LILO of Rayagada to Mohana S/C line at Akhusinghi Rayagada to Akhusinghi S/C Akhusinghi to Mohana Akhusinghi to Parlakemundi S/C Rayagada to VVC Ferro (JESCO) S/C Rayagada to Jayanagar S/C Rayagada to Theruvali S/C Theruvali to IMFA S/C Theruvali to J.K. paper S/C LILO of Kesingh to Theruvali S/C line at Vedanta Aluminum Theruvali to Vedanta Aluminum S/C Vedanta Aluminum to Kesingh
43
44
45 46 47 48 49 50 51 52
84
PRDC Bangalore
Owned By
9.1
Khurda to Balugaon T Balugaon T to Chandapur Chandapur to Balugaon Balugaon to Chatrapur Balugaon T to Atri Argul to Atri Atri to Baki Balugaon T to Narendrapur Balugaon to Solari Rly Chatrapur to Ganjam Chatrapur to IRE Chatrapur to Narendrapur
30
Conductor Type
Panther
Panther Panther Panther Panther Panther Panther
Panther
2.5 22.0 24.0 33.0 86.6 34.0
Panther Panther Panther Panther Panther
1.9 39.0 19.0 0.5
Panther
Panther
65.0 55.0 76.9 0.3 108.0 20.0 2.0 9.7
Panther Panther Panther Panther Panther Panther Panther
12.4 63.7 59.4
Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
53 54 55
Jayanagar to Tentulikhunti Jayanagar to Meenakshi Jayanagar to Machukhand Jayanagar to Machukhand (RE line) Jayanagar to Jayanagar Traction Jayanagar Traction to Maliguda traction Maliguda traction to Manbar traction Manbar traction to Machukhand road Machukhand road to Machukhand Jayanagar to Damanjodi Damanjodi to Sundarbeda Jayanagar to Sunabeda
56
57 58
Jayanagar Traction to Ch Kusumi Traction
59 60 61
Ckt type
Distance (km)
Conductor Type
S/C S/C S/C
54.6 53.2 43.0
Panther Panther Panther
148.0 0.5 12.0 S/C
63 64 65 66 67
Kesinga to Powmax (Turla)
37.0
S/C
50.0 45.0 13.0 40.0
S/C
20.0
S/C
S/C
Kesinga to Saintala S/C Saintala to Bloangir Old S/C Khariara to Naupara S/C LILO of Bolangir to Patnagarh S/C line at New Bolangir Bolangir to New Bolangir S/C New Bolangir to Patnagarh Bolangir to Bolangir New S/C LILO of New Bolangir to Bargarh S/C line at Barpali Barpali to Bargarh S/C New Bolangir to Barpali Bolangir to Sonepur S/C Sonepur to Boudh S/C Patnagarh to Padampur S/C Baragarh to ACC S/C LILO of Chiplima to Bargarh S/C line at Katapali Chiplima to Katapali S/C
68 69 70 71 72 73 74 75 76 77
85
PRDC Bangalore
Panther 17.7
Sunabeda to HAL S/C Machukhand to Vizag D/C Machukhand road to Padwa S/C Traction Dabugaon to Tentulikhunti S/C Dabugaon to Umerkote S/C LILO of Kesinga to Junagarh S/C line at Bhawanipatna Kesinga to Bhawanipatna S/C Bhawanipatna to Junagarh Kesinga to Khariar S/C
62
Owned By
Panther Panther Panther
0.7 45(160)
Panther Lark
20.0
Panther
43.2 45.9
Panther
6.6 43.0 37.4 58.5 14.5 40.0 33.0 77.2
Panther Panther Panther Panther Panther
0.5 3.0 39.8 3.0
26.0 60.0 54.0 51.1 44.6 3.0 12.7
Panther Panther
Panther Panther Panther Panther Panther Panther Panther
16.4
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Katapali to Bargarh Burla to Chiplima LILO at Katapali LILO at Rairakhole Burla to Katapali Katapali to Rairakhole Tap Rairakhole Tap to Sambalpur Rairakhole Tap to Rairakhole Rairakhole to Boinda Burla to Hindalco LILO at Sambhalpur LILO at Shyam DRI LILO at Aryan ispat Burla to Sambalpur Sambalpur to Shyam DRI
78
79
80
81
Ckt type
D/C
S/C
D/C
S/C
Distance (km) 38.5 20.0 8.5 0.5 11.1 85.2 0.4 65.3 89.9 8.3 0.5 29.4 6.9 19.9 33.0 10.0
Conductor Type
Owned By
Panther
Panther
Panther
Panther
Shyam DRI to Aryan Steel 82
85 86
Aryan Steel to Lapanga Lapanga to SMC SMC to Kuchinda Kuchinda to Rajgangpur Burla to Rajganpur Tap to Bamra traction Rajgangpur to Trakera Trakera to Raurkela Lapanga to Burla Bhudipadar to Lapanga Bhudipadar to Sundargarh Bhudipadar to Brajaraj Nagar
87
Bhudipadar to MSP
83
84
88
S/C
5.0 12.0 53.3 100.7
Panther Panther Panther
5.0
Panther
D/C D/C D/C S/C
28.4 3.0 57.3 16.4 29.9 11.7
S/C
0.6
Panther Panther Panther Panther Panther Panther Panther
S/C
Bhudipadar to Jharsuguda S/C LILO of Bhudipadar to Tarkera S/C Line at Rajgangpur Bhudipadar to Rajgangpur S/C Rajgangpur to Tarkera Bhudipadar to Kalugaon S/C Kalugaon to Tarkera S/C Bhudipadar to MCL D/C Jharsuguda to Jharsuguda S/C Traction Jharsuguda to Action ispat S/C Jharsuguda to L&T D/C Rajgangpur to OCL S/C Rajgangpur to Rajgangpur D/C Traction Tarkera to Rourkela D/C Tarkera to RSP 3
89
90 91 92 93 94 95 96 97 98
86
PRDC Bangalore
7.0
Panther
1.2 81.0 29.0 95.0 15.0 23.0
Panther Panther
OPTCL
Panther
0.2
Panther
1.6 15.7 0.5
Panther Panther Panther
2.1
Panther
3.0 11.0
Panther Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
99 100 101 102
Tarkera to Chhend Chhend to NugaonTraction Chhend to Adhunik Adhunik to Sriganesh LILO at Barbil LILO at Arya LILO at Beekey LILO at Bolain Rourkela to Bhalulata Tap Bhalulata Tap to Beekay Steels Beekay Steels to Nalda Nalda to Nalda Traction Nalda to Barbil Barbil to Arya Iron Arya Iron to Bolani Bolani to Joda
103
Ckt type
Distance (km)
Conductor Type
D/C S/C S/C S/C
6.2 36.0 21.0 2.0 1.4 0.5 2.4 7.9 27.0 14.0
Panther Panther Panther Panther
14.0
Panther
S/C
Bhalulata top to Bhalulata traction 104 105 106 107
108
109 110 111 112 113 114 115 116 117
118 119 120 121
87
8.0 10.0 12.0 25.0 3.7
Joda to Kenduposi Joda to Bansapani Joda to FAP Joda Arya iron to BRPL LILO at Karanjia LILO at Polasapanga Karenjia to Rairangpur Polasapanga to Karenjia Joda to Polasapanga Polasapanga to Keonjhargarh Rairangpur to Kuchei Kuchei to Baripada Baripada to Balasore Balasore to Birla Tyre
S/C S/C S/C S/C
S/C S/C S/C S/C S/C
50.0 3.0 1.0 9.0 23.5 18.0 72.5 90.0 55.0 19.4 66.1 11.0 57.3 3.0
Balasore to Somanthpur
S/C
3.0
Somanthpur to Emami S/C Balasore to Balasore Traction S/C Balasore to Balasore Alloys S/C LILO of Balasore to Jaleswar S/C line at Basta Balasore to Basta S/C Basta to Jaleswar LILO of Balasore to Bhadrak S/C line at Soro Balasore to Soro S/C Soro to Bhadrak Jaleswar to Jaleswar Traction S/C Bhadrak to Dhamara Traction S/C Bhadrak to Dhamara Port S/C
1.5 3.6 6.0
PRDC Bangalore
S/C
Owned By
Panther Panther Panther
Panther OPTCL Panther Panther Panther Panther Panther Panther
Panther Panther Panther
0.5 24.5 32.5
Panther
1.0 34.8 40.3 2.0 36.0 65.0
Panther Panther Panther Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No 122 123
Transmission line
Ckt type
Bhadrak to FACOR S/C Bhadrak to Bhadrak Traction S/C LILO of Bhadrak to Jajpur road S/C at Jajpur Town Jajpur road to Jajpur Town S/C Jajpur Town to Bhadrak Jajpur Road to Anadapur S/C Jajpur Road to Kendrapara S/C LILO of Jajpur Road to Kendrapara S/C line at Chandikhole Jajpur Road to Chandikhole S/C Chandikhole to Kendrapara Jajpur Road to Duburi D/C Kendrapara to Pattamundai S/C Kendrapara to Paradeep S/C Kendrapara to Marshghai
124 125 126 127 128 129 130 131
Marshghai to Paradeep
132 133 134 135 136
S/C
Paradip to IFFCO D/C Paradip to PPT D/C Paradip to PPL D/C Duburi to MISRILAL (MSL) S/C Duburi to MESCO S/C LILO of Duburi to MESCO S/C line at BRPL Duburi to BRPL S/C BRPL to MESCO Duburi to Jakhpur Traction S/C LILO of Duburi -TISCO (Bamanipal) S/C Line at B.C.Mohanty Duburi to B.C. Mohanty S/C B.C. Mohanty to TISCO (Bamanipal) B.C. Mohanty to Tomaka traction S/C Meramundali to ML Rungta S/C Meramundali to BRG S/C
137 138
139
140 141 142
Distance (km)
Conductor Type
4.6 8.5
Panther Panther
Owned By
10.5 28.0 38.0 29.4 63.0
Panther Panther Panther
1.6 32.0 34.1 13.0 19.5 34.8 12.0 31.5
Panther Panther Panther Panther Panther Panther
7.2 7.7 6.2 9.0 5.0 2.8 4.0 6.5 13.2
Panther Panther Panther Panther Panther
8.0
Panther
Panther Panther
13.0 11.9 7.5 3.6
Panther Panther Panther Panther
143
Nuapatna Tap to Nuapatna
S/C
37.1
144 145 146 147 148 149 150
Nuapatna Tap to Dhenkanal Kharagprasad to Meramundali Kharagprasad to Nabbharat Kharagprasad to Salibahan Kharagprasad to Hind Metal Kharagprasad to Samal Metal Kharagprasad to Traction
S/C D/C D/C S/C S/C S/C S/C
37.1 5.5 0.6 7.0 0.5 1.0 1.2
Panther Panther Panther Panther Panther Panther Panther
-
Twin Moose
Sikkim 400 kV Lilo of Teesta to V to Binaguri D/C line (115km) at Rangpo
1
88
PRDC Bangalore
PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
2 3
Teesta V to Rangpo Rangpo to Binaguri Teesta 3 to Rangpo Rangpo to Kishanganj
Ckt type
D/C D/C S/C D/C 220kV Jorethang loop to Rangpo S/C LILO of one circuit of 220kV D/C from Jorethang loop to new melli at Rangpo Jorethang loop to New Melli S/C Jorethang loop to New Melli S/C Rangpo to new melli S/C 132 kV Rangit to Rammam S/C Rangit to Rangpo S/C Rangeet HEP to Sagbari S/C Sagbari to Melli S/C
1 2 3 4 1 2 3 4 5
Sagbari to Geyzing
S/C
Distance (km)
25.0
Zebra Zebra Zebra
27.0 54.2 0.3 32.0
Panther Panther Panther Panther Panther
PGCIL PGCIL NHPC -
-
-
-
26.0 21.0 48.6 90.0 16.6 68.0
Panther Panther+Zebra Panther Panther Panther
Gati infra Sikkim
0.2 0.7 12.0 21.0 15.0 8.0 5.0 18.0 4.0
Dog Dog Dog Dog Dog Dog Dog Dog Dog Dog
15.5
Bulbuley to Gangatok PGCIL
S/C
10.0
11 12 13 14 15 16 17 18 19 20
Mangan to Meyong HEP Mangan to Phudong Rongli HEP to Rongli Rongali to Rhenock Geyzing 132kV to Geyzing 66kV Geyzing 132kV to Pelling Geyzing to Namchi Melli 132kV to Melli 66kV Melli 66kV to Purano Namchi Melli 66kV to Namchi
S/C S/C S/C S/C S/C S/C S/C S/C S/C S/C
12.0 20.0 4.9 12.0 0.2 2.1 25.0 0.1 22.0 22.0
PRDC Bangalore
PGCIL
10.0 11.5 26.0
10
89
Zebra Zebra
1 2 3 4 5 6 7 8 9
7 8 9
Owned By
12.3 110.0 47.0 148.0
LILO of Gangtok to Melli at Rangpo and Chuzachen Rangpo to Gangtok Rangpo to Chuzachen S/C Gangtok to Chuzachen Melli to NJP S/C Melli to Rangpo S/C Rangit to Kurseong S/C 66 kV LLHP G/T to Ranipool D/C Ranipool to Gangtok PGCIL S/C Ranipool to Pakyong S/C Pakyong to Rongli S/C Ranipool to Topakhani S/C Tadong to Gangatok PGCIL S/C Tadong to Sichey S/C Tadong to Phudong S/C Sichey to Bulbuley S/C
6
Conductor Type
PGCIL
Sikkim Gov Dog Dog Dog Dog Dog Dog Dog Dog Dog Dog
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
21 22 23 24 25
Melli 66kV to Mamring Melli 66kV To Kalingpong Rangit HEP to Ravangla Purno Namchi to Rohatak Rohtak to Soreng
S/C D/C S/C S/C S/C
18.0 15.0 13.0 9.0 11.0
Dog Dog Dog Dog Dog
400 kV S/C S/C S/C S/C S/C D/C
136.0 163.0 200.0 80.0 73.0 26.0
Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose HTLS
D/C
71*
Twin Moose
D/C
90.0
Twin Moose
Owned By
West Bengal 1 2 3 4 5 6
8
Jeerat to KTPS Jeerat to Bakreswar Jeerat to Behrampur Jeerat to Subhashgram Farakka (NTPC) to Behrampur Sagardighi to Behrampur Behrampur to Behramara (Bangladesh) Subhashgram to Haldia
9
Sagardighi to Subhashgram
S/C
246.0
Twin Moose
10
S/C
67.0
Twin Moose
4
95.0
Twin Moose
12 13 14 15 16 17
Farakka (NTPC) to Sagardighi Farakka (NTPC) to Kahalgaon I, II, III & IV Farakka (NTPC) to Malda Farakka (NTPC) to Gokarna Sagardighi to Parulia (PGCIL) Arambag to KTPS KTPS to Kharagpur KTPS to Kharagpur
D/C D/C D/C S/C S/C S/C
40.0 94.6 171.0 78.0 95.0 91.0
Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose
18
Kharagpur to Baripada
S/C
98.0
Twin Moose
19 20 21
PPSP to Arambag PPSP to Bidhanagar PPSP to New ranchi Parulia (PGCIL) to Bidhanagar (Durgapur)
D/C D/C S/C
210.0 183.5 85.0
Twin Moose Twin Moose Twin Moose
D/C
11.0
Twin Moose
23
Parulia (PGCIL) to Jamshedpur
S/C
177.0
Twin Moose
24
Durgapur (DSTPS) to Raghunathpur (RTPS)
7
11
22
WBSETCL
PGCIL
CESC PGCIL
PGCIL
WBSETCL WBSETCL & OPTCL
WBSETCL
PGCIL DVC
Maithon to Raghunathpur (RTPS) Raghunathpur (RTPS) to Ranchi Raghunathpur (RTPS) to Ranchi Durgapur (DSTPS) to Jamshedpur PG Maithon to Mejia B Mejia B to Jamshedpur Maithon to Mejia B Malda (PGCIL) to Purnea
25 26 27 28 29 30
90
PRDC Bangalore
D/C
70.5
Twin Moose Twin Moose
D/C
52.9 169.0 155.0
Quard Moose
D/C
161.0
Twin Moose
S/C
S/C D/C D/C
84.0 168.0 59.0 167.0
DVC & PGCIL DVC DVC & PGCIL
Twin Moose Twin Moose Twin Moose
PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
31 32 33 34 35 36 37 38 39 40
Binaguri (PGCIL) to Purnia I & II Binaguri (PGCIL) to Purnia III & IV Binaguri (PGCIL) to Malbase Binaguri (PGCIL) to Rangpo - I Binaguri (PGCIL) to Rangpo - II Binaguri (PGCIL) to Bongaigaon Binaguri (PGCIL) to Alipurduar Alipurduar to Bongaigaon Binaguri (PGCIL) to Tala IV Binaguri (PGCIL) to Tala I & II Farakka (NTPC) to Parulia (PGCIL) Arambag to Bakreswar Maithon to Parulia (PGCIL) Bidhannagar to Arambag Ranchi to Arambag KTPS to Chaibasa Kharagpur to Chaibasa
41 42 43 44 45 46 47 1 2 3 4 5 6 7 8 9 10 11
Ckt type
Distance (km)
Conductor Type
D/C D/C S/C S/C S/C D/C D/C D/C S/C D/C
168.0 160.0 121* 110.0 110.0 217.0 114.0 122.4 98* 115*
Twin Moose Quad Moose Twin Moose Twin Moose Twin Moose Twin Moose Quad Moose Quad Moose Twin Moose Twin Moose
D/C
150.0
Twin Moose
S/C D/C S/C S/C S/C S/C 220 kV D/C D/C D/C D/C D/C D/C D/C D/C S/C S/C S/C
130.0 70.7 115.0 111.5 70.0 161.0
Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose Twin Moose
WBSETCL
40.0 17.2 10.0 75.0 6.0 40.0 71.0 6.0 40.5 89.9 145.5
Zebra ACSR DEER Zebra Zebra Zebra Zebra Zebra Zebra Deer+Zebra Deer+Zebra Zebra
WBSETCL DVC
D/C
0.6
Moose
D/C D/C D/C D/C D/C D/C D/C
45.6 1.0 31.0 108.0 41.0 116.0 6.0
Zebra Zebra Zebra Zebra Zebra Zebra Zebra
16 17 18
Bakreswar to Bidhanagar Bidhanagar to Waria (DTPS) Bidhanagar to DPL Gokarna to Sadaipur Sadaipur to Bakreswar Jeerat to New Town KTPS to Howrah NJP (WB) to Binaguri J K nagar to Bidhanagar J K Nagar to STPS STPS to New Bishnupur Subhasgram (WB) to Subhasgram (PG) Kharagpur to Midnapur Dalkhola to Dalkhola (PG) Dalkhola PG to Kishanganj Kishanganj to Siliguri (PG) Dalkhola PG to Purnea Dalkhola PG to Malda Binaguri to Siliguri (PG)
19
Binaguri to Birpara
D/C
80.0
Zebra
20 21 22 23 24
Birpara to Salakati (NER) Birpara to Malbase Birpara to Chukha Gokarna to Sagardighi Farakka to Lalmatia
D/C S/C D/C D/C S/C
160.0 40.0 38.0 40.0 79.0
Zebra Zebra Zebra Zebra Zebra
25
STPS to Chandil
S/C
98.0
12 13 14 15
91
PRDC Bangalore
Zebra
Owned By
PGCIL
WBSETCL
PGCIL WBSETCL/I PCL WBSETCL
PGCIL
PGCIL WBSETCL PGCIL WBSETCL & JSEB
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
26
Subhashgram (PG) to Newtown (WBSETCL)
S/C
24.0
27
Kasba to EMSS
S/C
1.0
Single Core XLPE
28
Subhasgram (PG) to EMSS (CESC)
D/C
23.2
ACSR Moose
EMSS to Budge Budge G.S (BBGS)
D/C
85.0
29
D/C
2.5
30
NCGS to EMSS
D/C
19.0
31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
D/C S/C D/C D/C D/C D/C D/C D/C D/C D/C D/C S/C D/C D/C S/C S/C S/C S/C
71.0 73.0 49.0 132.0 58.0 34.0 14.5 78.0 55.0 22.0 52.0 80.8 145.0 56.0 114.0 62.0 45.3 131.8
D/C
43.0
Zebra
S/C S/C S/C S/C
70.0 32.5 32.5 36.0
Zebra Zebra Zebra Zebra
S/C
20.7
Zebra
S/C
20.0
Zebra
D/C
7.6
Zebra
57
Arambagh to Midnapore Arambagh to Rishra Arambag to New Bishnupur Bakreswar to Satgachia Domjur to Arambagh Howrah to Foundry Park Foundry Park to Domjur Jeerat to Satgachia Kasba to Jeerat Kasba to Subhasgram (WB) Krishnanagar to Satgachia NJP (WB) to TLDP‐III NJP (WB) to TLDP‐IV New Haldia to KTPS Bidhanagar to Asansol STPS to Asansol STPS to Hura Hura to New Bishnupur Subhasgram (WB) to Lakshmikantapur Jeerat to Rishra Jeerat to Dharampur Dharampur to Rishra Malbase to Chukha Subhasgram (PG) to Bantala CLC (WB) Bantala (CLC) to New town Kalyanisweri to Maithon (Pithakari) PGCIL Maithon(Pithakari) to Dhanbad
Moose 800 sqmm, XLPE 800 sqmm, XLPE Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra Zebra
D/C
52.0
58
Mejia to Borjora
D/C
8.5
Zebra ACSR Zebra
59
Mejia to Muchipara (Durgapur) Muchipara (Durgapur) to Parulia (DVC) Parulia (DVC) to Tumla Burnpur to IISCO Mejia (DVC) to Waria DTPS (DVC) Waria (DTPS) to Parulia (DVC)
D/C
31.5
Zebra
D/C
14.8
Zebra
3 D/C
6.0 1.2
Zebra AAAC ZEBRA
D/C
42.0
Zebra
D/C
22.0
Zebra
49 50 51 52 53 54 55 56
60 61 62 63 64
92
PRDC Bangalore
Conductor Type Zebra
Owned By WBSETCL
CESC
WBSETCL
PGCIL WBSETCL
PGCIL
DVC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
Owned By
65 66 67 68 69 70 71
Parulia (DVC) to Parulia (PG) Mejia to Kalyanswari Mejia to Burnpur Burnpur to Kalyanswari Gokarna to Krishnanagar Kharagpur to Egra Kharagpur to Vidyasagar Park
D/C S/C S/C S/C D/C D/C D/C
1.0 54.9 58.2 22.0 105.0 53.5 100.0
Zebra Zebra Zebra Zebra Zebra Zebra Zebra
DVC WBSETCL
132 kV 1
Adisaptagram to Belmuri
D/C
32.0
Panther
2
Adisaptagram to BTPS
D/C
10.0
Panther
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
S/C D/C D/C D/C D/C D/C S/C S/C S/C D/C S/C D/C D/C S/C D/C
19.0 40.5 24.0 32.0 34.0 39.0 69.0 18.0 0.6 36.2 3.8 59.6 35.0 3.0 47.3
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
S/C
13.0
Panther
D/C S/C S/C D/C
10.0 54.0 67.0 0.5
Panther Panther Panther Panther
S/C
48.0
Panther
S/C
5.0
Panther
S/C
88.0
Panther
S/C
4.0
Panther
27 28 29
Alipurduar to Coochbehar Amtala to Debagram Arambag to Birsingha Arambag to Raina Arambag to Tarakeswar Ashoknagar to Basirhat Bagmundi to Purulia (WB) Balichak TSS to Pingla Bankura to Bankura TSS Bankura to Bishnupur New Bankura to Bengal Concast Bankura to Raghunathpur Barasat to New Town AA‐III Barasat to Barasat TSS Berhampore to Amtala Berhampore to Cossimbazar traction Bighati to Rishra Birpara to Alipurduar Birpara to Coochbehar Birpara to Birpara (PG) Bishnupur to (Chandrakonaroad) CK Road Chandrakonaroad (CK Road) to CK Road Rail Bishnupur to Midnapur Bishnupur to Modern/ Gaytri (load) Bishnupur to New Bishnupur Bishnupur to New Bishnupur Bishnupur to Rohit Ferro
D/C S/C S/C
5.5 3.0 2.8
30
New Bishnupur to Borjora
D/C
44.5
Panther Panther Panther Panther
31 32 33 34 35
Borjora to Durgapur (Bidhanagar) Bolpur to Durgapur (Bidhanagar) Bolpur to Sainthia BTPS to Dharampur BTPS to Bighati
D/C D/C D/C 3 D/C
27.0 71.0 40.0 26.0 25.0
18 19 20 21 22 23 24 25 26
93
PRDC Bangalore
WBSETCL
Panther Panther Panther Panther Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
Conductor Type
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
BTPS to Kalyani BTPS to Khanyan BTPS to Satgachia Chanditala to Rishra CK Road to Ck Road Traction Contai to Egra Contai to Bajkul Egra to Bajkul Contai to New Haldia Dalkhola to Raigaunj Dalkhola to TCF PS ‐ III Dankuni to Hind Motor Dankuni to Liluah Debagram to Debagram TSS Debagram to Katwa Dharampur to Kalyani
S/C S/C S/C D/C S/C S/C S/C S/C S/C D/C D/C S/C S/C S/C D/C S/C
22.0 18.0 55.0 6.0 5.0 32.0 33.0 65.0 77.0 51.0 95.0 7.0 8.0 6.0 35.0 10.0
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
52
Dharampur to Ranaghat
D/C
26.0
53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75
Dharampur to Titagarh Dhulian to Farakka Domjur to Jangipara Domjur to Chanditola Domjur to Uluberia Durgapur (Bidhanagar) to DPL Durgapur (Bidhanagar) to Mankar Durgapur (Bidhanagar) to Ukhra Egra to New Haldia Gangarampur to Balurghat Gokarna to Katwa Gokarna to Berhampore Gokarna to Lalgola Gokarna to Lalgola Lalgola to Raghunathganj Gokarna to Raghunathganj Gokarna to Rampurhat Gokarna to Kuli Haldia to Haldia NIZ Haldia NIZ to Rohit Ferro Haldia to TATA Power Haldia to New Haldia New Haldia to Bajkul
D/C S/C D/C D/C D/C D/C D/C D/C S/C S/C D/C D/C S/C S/C S/C S/C S/C S/C D/C S/C D/C S/C D/C
29.0 22.0 17.0 25.0 27.0 10.0 30.0 22.5 100.0 35.0 57.0 18.0 46.8 67.0 27.0 42.0 63.0 23.6 22.0 2.0 6.5 2.0 45.0
76
Haldia NIZ to Maniksia
S/C
1.0
77 78 79
Hizli to Midnapur Egra to Bengal Energy (BEL) Bengal Energy (BEL) to Hizli
D/C S/C S/C
25.5 50.1 22.7
94
PRDC Bangalore
Owned By
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
Panther Panther Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Ckt type
Distance (km)
Conductor Type
S/C D/C S/C S/C S/C S/C D/C D/C D/C D/C D/C D/C S/C S/C S/C S/C S/C D/C S/C
13.0 14.0 18.0 24.0 3.0 2.0 15.0 27.7 24.5 36.0 14.0 18.8 21.0 13.0 13.0 12.0 2.4 45.0 42.0
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
S/C
1.0
Panther
S/C
5.0
Panther
D/C D/C D/C S/C D/C D/C D/C S/C D/C
S/C D/C D/C S/C S/C S/C D/C D/C S/C
66.5 2.6 4.0 5.0 53.0 46.0 33.4 10.0 19.0 29.0 16.0 21.0 35.6 34.0 53.5 58.0 19.5 36.0 43.0 54.0 98.4
Panther Panther Panther Panther Panther Panther Panther Panther Panther
111 112 113 114 115 116 117 118 119
Hind Motor (HM) to Rishra Howrah to Liluah I&II Howrah to Liluah III Howrah to Liluah IV HPCL to Haldia HPCL to New Haldia Jeerat to Ashoknagar Jeerat to Mahispota Jeerat to Barasat Jeerat to Bongaon Jeerat to Dharampur Kalna to Satgachia Kasba to Salt Lake Kasba to KLC KLC to Salt Lake Kasba to Sonarpur Katwa to Katwa TSS Katwa to Satgachia Khanyan to Satgachia Kharagpur (DVC) to Kharagpur (WB) Khargapur (WBIDC) to TATA Metalic Khatra to Bishnupur Old Khejuria to Farakka (Cable) Kolaghat to KTPS Kolaghat to Madras Cement Krishnanagar to Bongaon Krishnanagar to Debagram Krishnanagar to Ranaghat Tamluk TO Tamluk rail KTPS to Tamluk KTPS to Uluberia KTPS to Bagnan Bagnan to Uluberia Kuli to Sainthia Laxmikantapur to Falta Laxshmikantapur to Kakdwip Liluah to BTPS Liluah to Rishra Liluah to Rishra Mahachanda to Mankar Mahachanda to Satgachia Malda to Balurghat Tap point
120
Malda to Khejuriaghat
D/C
35.0
121 122 123
Malda to Malda (PG) Malda to Raigaunj Malda to Samsi
D/C S/C S/C
7.0 85.0 55.0
Sl.No
Transmission line
80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110
95
PRDC Bangalore
S/C
Owned By
DVC
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
WBSETCL
Panther Panther Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Ckt type
Distance (km)
Conductor Type
S/C S/C
18.0 26.0
Panther Panther
S/C
46.0
Panther
D/C S/C S/C S/C S/C S/C S/C S/C
48.0 41.0 43.0 50.0 83.8 43.0 47.2 28.4
Panther Panther Panther Panther Panther Panther Panther Panther
S/C
8.3
Panther
S/C
15.0
Panther
D/C
11.1
Panther
S/C S/C S/C S/C S/C S/C S/C S/C D/C S/C S/C S/C S/C S/C S/C S/C D/C D/C D/C S/C S/C S/C D/C S/C S/C S/C S/C
12.1 66.0 15.0 69.0 18.0 78.0 41.0 16.0 35.0 22.0 44.0 75.0 38.0 6.0 68.0 18.0 16.0 46.0 18.0 16.0 34.0 20.0 15.9 20.0 37.0 90.0 80.0
Hizli to Hizli TSS
S/C
1.1
Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther Panther
Midnapur to BRG steel Tap BRG steel Tap to BRG BRG steel Tap to Vidyasagarpark
S/C S/C S/C
2.5 8.4 87.5
Sl.No
Transmission line
124 125
138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164
Midnapur to Khargapur (WBIDC) Midnapur to Balichak TSS Midnapur to Chandrakonaroad (CK Road) Midnapur to Jhargram Midnapur to Pingla Moinaguri to Birpara Moinaguri to Mathabhanga Mathabhanga to Birpara Moinaguri to Chalsa Gokarna to Sonar Bangla Sonar Bangla to Lalgola New Town AA‐III to New Town AA‐I New Town AA‐III to Salt Lake GIS New Town AA‐I to Salt Lake GIS S/C New Town AA‐I to CLC NBU to Lebong NBU to NJP (PG) NBU to Rammam NBU to TCF PS ‐ I NJP (WB) to Chalsa NJP (WB) to Moinaguri NJP (WB) to TCF PS ‐ I Purulia (WB) to STPS Raghunathganj to Dhulian Raghunathganj to Farakka Raigaunj to Gangarampur Rampurhat to Sainthia Reshmi to TATA Metalic Samsi to Raigaunj Satgachia to Debagram TSS Siliguri to NJP (WB) Tamluk to Haldia NIZ Tarakeswar to Belmuri TCF PS ‐ I to TCF PS ‐ II TCF PS ‐ I to TCF PS ‐ III TCF PS ‐ II to TCF PS ‐ III Hura to Purulia(WB) Howrah to Foodpark Foodpark to Kolaghat Vidyasagarpark to Hizli TSS Vidyasagarpark to Hizli
165 166 167 168
126 127 128 129 130 131 132 133 134 135 136 137
96
PRDC Bangalore
Owned By
Panther Panther Panther
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Ckt type
Distance (km)
Conductor Type
D/C S/C S/C S/C S/C S/C
11.1 10.0 90.0 31.3 68.0 10.0
Panther Panther Panther Panther Panther Panther
D/C
5.0
Panther
S/C S/C D/C D/C D/C S/C S/C D/C D/C D/C D/C D/C D/C D/C D/C S/C S/C D/C
10.0 10.0 20.0 33.4 28.8 18.0 27.0 5.0 5.0 39.7 69.2 51.5 49.3 57.3 69.2 33.0 1.8 95.2
Panther Panther Panther Zebra Panther Panther Panther Panther Lark Lark Lark Lark Lark Lark Lark AAAC Panther AAAC Panther ACSR LARK
195 196 197 198 199 200 201 202 203 204 205 206 207 208
New Town AA-1 to Salt Lake GIS NJP (WB) to NJP (PG) NJP (PG) to Melli NJP (PG) to Kurseong Kurseong to Rangit NJP (WB) to NBU Raghunathganj to farakka Ambuja Cement NBU to Siliguri ( Ujanoo) Midnapur to Rashmi Crescent power to Asansol Raghunathpur to Hura Joka to Falta Joka to Sonarpur Kasba to Joka Kolagat (WB) to Kolagat (DVC) Waria (DTPS) to ASP Wariac (DTPS) to Kalipahari Waria to Burdwan Belmuri to Burdwan Belmuri to Howrah Howrah to Kolaghat Kolaghat to kharagpur Waria (DTPS) to Jamuria Borjora to Sonic Thermal Mosabani to Kharagpur Kolaghat to Badrinarayan alloy steel DTPS to DPL Joka to Sirakol Amtala to Najirpur Rammam to Rangit Laxmikantapur to Sirakol Siliguri to Siliguri ( Ujanoo) Dalkhola to Kishengunj Lebong (Darjeling) to Rammam DPPS to B Zone DPPS to A Zone DPPS to C Zone DPPS to C1 Zone DPPS to AB Zone A Zone to Bamunara
D/C S/C D/C S/C D/C S/C S/C S/C D/C S/C D/C D/C D/C D/C
11.0 17.0 13.4 27.0 35.2 10.0 26.0 20.0 1.6 6.4 4.8 5.5 1.2 3.6
Lark Panther Panther Panther Panther Panther Panther Panther Panther Panther Bison Panther Panther Panther
209
BBGS to Chakmir
D/C
20.1
ACSR Moose
210
BBGS to Chakmir
D/C
18.7
ACSR Moose
211
Chakmir to Majerhat
D/C
6.1
212
Chakmir to Taratala
D/C
5.4
Sl.No
Transmission line
169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194
97
PRDC Bangalore
Owned By
PGCIL
WBSETCL
DVC
No proper details available
XLPE 630 sqmm XLPE 630 sqmm
DVC/DPL
WBSETCL
DPL
CESC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
213
Taratala to BBD Bag
S/C
10.4
214
Taratala to PRS
S/C
11.0
215
Majerhat to Taratala
S/C
0.9
216
Jadavpore to Majerhat
S/C
5.6
217
Majerhat to Southern
D/C
6.4
218
Majerhat to PRS
S/C
9.0
219
WBSETCL (Howrah) to Southern
S/C
3.0
220
Botanical Garden to Southern
D/C
2.2
221
WBSETCL (Howrah) to B.Garden
D/C
1.1
222
BBD Bag to PRS
D/C
1.4
223
East Calcutta to PRS
S/C
6.6
224
PRS to Park lane
S/C
2.1
225
East Calcutta to Chitpur railway
S/C
7.4
226
Chitpur railway to Btroad
S/C
5.6
227
BT road to NCGS
S/C
1.5
228
BT road to NCGS
S/C
2.5
229
BT road to Titagarh
S/C
9.3
230
Dum dum to BT road
S/C
7.5
231
NCGS to Titagarh
S/C
13.4
232
WBSETCL (Titagarh) to Titagarh
D/C
0.5
233
WBSETCL (Lilooah) to Belur
T/C
4.4
234
WBSETCL (Rishra) to Rishra
D/C
6.4
235
EMSS to East Calcutta
S/C
7.8
236
EMSS to PRS
S/C
9.8
98
PRDC Bangalore
Conductor Type
Owned By
XLPE 630 sqmm XLPE 630 sqmm XLPE 630 sqmm XLPE 630 sqmm XLPE 400 sqmm XLPE 400 sqmm GF 161 sqmm XLPE 800 sq.mm( 1st circuit) 2 x GF 161 sq.mm. Cu.( 2nd circuit) XLPE 630 sq.mm( 1st circuit) 2 x GF 161 sq.mm. Cu.( 2nd circuit) XLPE 630 sqmm XLPE 630 sqmm XLPE 800 sqmm XLPE 630 sqmm XLPE 630 sqmm GF 260 sq. mm. Cu XLPE 800 sqmm XLPE 800 sqmm XLPE 800 sqmm XLPE 400 sqmm GF 225 sq. mm. Al. GF 161 sq.mm. Cu XLPE 800 sqmm XLPE 800 sqmm XLPE 800
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl.No
Transmission line
Ckt type
Distance (km)
237
WBSETCL (Kasba) to EMSS
T/C
0.4
238
EMSS to Jadavpore
S/C
11.0
239
EMSS to Park lane
S/C
7.0
240
EMSS to Patuli
S/C
7.0
241
East calcutta to DDSS
S/C
11.0
242
EMSS to DDSS
S/C
17.3
99
PRDC Bangalore
Conductor Type
Owned By
sqmm XLPE 800 sqmm XLPE 630 sqmm XLPE 800 sqmm XLPE 800 sqmm XLPE 800 sqmm XLPE 800 sqmm
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table C: State wise list of generators present in the eastern region grid Power station details Sl.No
Name of the power station
Capacity of each unit (MW)
Total capacity (MW)
Owned By
2 2
110 110
220 220
1
195
195
BSPGCL Joint venture of NTPC & BSEB
15
BSHPGCL
No. of units Bihar State Sector
1
Barauni (BTPS)
2
Muzaffarpur (Kanti)
3
Eastern gandak canal HEP (Valmikinagar)
3
5
1
Khalgoan
2
Barh STPP, St-II
Central sector 4 3 2
210 500 660
2340
NTPC
1320
Jharkhand State Sector 1 2 3
PTPS TTPS Subernrekha (SHPS)
1
Bokaro 'B'
2
Chandrapur
3 4
Koderma TPS Tiliya
5
Maithon dam
6 7
Panchet MGT gen (Gas based)
1 2 2 DVC 3 1 3 2 2 2 1 2 2 3
110 210 65
110 420 130
210 500 140 250 500 2 23.2 20 40 27.5
630 500
DVC
920
DVC
1000 4
DVC DVC
63.2
DVC
80 82.5
DVC DVC
427.5
Tata Steel
CPP 120 67.5 70 30 25 15 10 20 30
Adhunik Power Co. Ltd.
3 1 1 3 1 1 2 2 2 IPP 2
270
540
Maithon RB (MPL)
2
525
1050
1
Jojobera
2
Inland Power
3
Usha Martin Ltd. (Adityapur)
4 5 6
Usha Martin Ltd. (Ranchi) Rungta mines ABCIL
1 2
100
PRDC Bangalore
70 130 20 40 60
Joint venture of DVC & TATA September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Power station details Sl.No
Name of the power station
No. of units
Capacity of each unit (MW)
Total capacity (MW)
Owned By
Odisha State sector 1
Burla power house (Hirakud-I)
2 2 3
49.5 32 37.5
275.5
OHPC
2
Chiplima power house (HirakudII)
3
24
72
OHPC
3
Balimela power house (HPS)
OHPC
Rengali power house (HPS) Upper Kolab power house (HPS) Upper Indravati hydro electric (HPS)
60 75 50 80
510
4 5
6 2 5 4
250 320
OHPC OHPC
4
150
600
OHPC
3 3 2 4 2
17 21.5 210 60 110
115.5
OHPC
420
OPGC
460
NTPC
3000
NTPC
6 7
Machhkund power house (HPS)
8
IB thermal power station
9
TTPS (NTPC- State dedicated)
Central sector Talcher super thermal power-I Talcher super thermal power-II
1
2 4
500 500
CPP 1
NALCO (Angul)
10 2 4 2 2 1 1 4 1 2
120 60 25 54 60 30 67.5 100 24 19.25
2
RSP (Rourkela)
3
ICCL (IMFA), (Choudwara)
4
HPCL(HINDALCO), (Hirakud)
5
KMCL (NINL), (Duburi)
6
NBVL (Meramundali)
1
30
Shyam DRI (Pandoli, Sambalpur)
1 1 1 3 2 3 1 1 1
64 60 40 130 8 30 18.5 7.5 33
7
Bhusan Power & Steel, Jharsuguda
8
Vedanta (Lanjigarh)
9
Tata sponge iron (Joda)
10 11
Aarti steel (Ghantikhal, Cuttak)
1
40
101
PRDC Bangalore
1200 220 258 467.5 62.5 94
506 90 26 33 40
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Power station details Sl.No
Name of the power station
12
Bhusan steel and strips (Meramundali)
13
Jindal stainless Ltd. (Duburi)
14 15 16
Vedanta (Jharsuguda) Visa steel (New Duburi) IFFCO (Paradeep)
17
SMC power generation Ltd.
18
Action ispat and power Ltd.
19
Aryan ispat and power Ltd.
20
EMAMI
21 22
25 26
Shree Ganesh ACC ( Baragarh) Jindal steel and power Ltd. (Angul) Maithan ispat nigam Ltd. (Jajpur road) MSP mettallics Ltd. OCL India Ltd.
27
FACOR
28 29
HINDALCO (AAL) (Budhipadar) Maheswari Ispat Pvt Ltd
1
Meenakshi power (Jayanagar)
23 24
3 4 5 6
Odisha power consortium Ltd. (Samal) Aarati steel (Ghantikhal) Sterlite energy Ltd. (Jharsuguda) GMR Kamalanga JITPL (Derang)
7
Ind-Barath
2
No. of units
Capacity of each unit (MW)
Total capacity (MW)
1 1 2 2 1 9 3 2 1 1 1 1 2 1 1 1 1 1
33 77 150 125 13 135 25 55 8 25 12 25 43 18 15 5 32 30
6
135
810
1
30
30
1 2 1 1 4 2 IPP 3 2
25 27 45 55 150 12
25 54 45 55 600 24
4 12.5
37
4
5
20
1 4 3 2
50 600 350 600
50 2400 1050 1200
1
350
350
Owned By
410 263 1215 75 110 33 123 18 20 32 30
Sikkim 1 2 3
LLHP Meyonchu Rongali HEP
1 2
Teesta-V Rangeet -III
102
PRDC Bangalore
State Sector 2 6 2 2 2 3.125 Central sector 3 170 3 20
12 4 6.25
Sikkim Gov.
510 60
NHPC NHPC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Power station details Sl.No
Name of the power station
No. of units
Capacity of each unit (MW)
Total capacity (MW)
3
Teesta-III
6
200
1200
4
Dikchu
2
48
96
55 48
110 96
Owned By
Teesta Urga ltd.
IPP 1 2
Chuzachen Jortheang loop
2 2 West Bengal
State Sector 5 210 4 60 Bandel TPS 1 210 3 210 Kolaghat TPS 3 210 2 300 Sagardighi TPS 2 500 Santaldih TPS 2 250 Rammam II hydro 4 12.75 Purulia pumped storage 4 225 Jaldhaka hydro 1 3 9 Teesta canal fall hydro 1 3 7.5 Teesta canal fall hydro 2 3 7.5 Teesta canal fall hydro 3 3 7.5 Central sector 3 200 Farakka 3 500 Chuka Bhutan, Hydro 4 84 Tala Bhutan, Hydro 6 170 Teesta low dam 3 4 33 Teesta low dam 4 2 40 Private Sector and DVC 1 110 DPL 1 250 1 300 4 210 Mejia 2 250 1 140 Waria TPS (DTPS) 1 210 Mejia TPS phase-II 2 500 Durgapur steel TPS 2 500 2 250 Budge Budge 1 250 Southern generating station 2 67.5 Haldia TPP 2 300 Raghunathpur TPS 2 600 CPP
1
Bakreswar TPS
2 3 4 5 6 7 8 9 10 11
1 2 3 4 5
1 2 3 4 5 6 7 8 9
103
PRDC Bangalore
1050
WBPDCL
450
WBPDCL
630 630
WBPDCL
1600
WBPDCL
500 51 900 27 22.5 22.5 22.5
WBPDCL WBSEDCL WBSEDCL WBSEDCL WBSEDCL WBSEDCL WBSEDCL
2100
NTPC
336 1020 132 220
Bhutan Bhutan NHPC NHPC
DPL 1340
DVC
350
DVC
1000 1000 500 250 135 600 1200
DVC DVC CESC CESC CESC DVC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Power station details Sl.No
Name of the power station
1
Tata power
2
Crescent power
104
PRDC Bangalore
No. of units
Capacity of each unit (MW)
2 1 2
45 30 20
Total capacity (MW)
Owned By
120 40
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table D: State wise list of Bus reactors present in the eastern region grid Existing reactor details Sl. No
Name of the substaion
Voltage level (kV)
no of units
capacity of each unit (MVAr)
Total capacity (MVAr)
2 2 1 1 1 3 2 1 2 2 1 1 1 1 2 2
240 125 125 50 80 50 125 80 125 125 80 80 80 330 125 125
480 250 125 50 80 100 250 80 250 250 80 80 80 330 250 125
400 765 400 400 400 400 400 400 400
2 2 1 2 2 1 1 2 1
125 240 50 125 50 80 125 50 80
250 480 50 100 100 80 125 100 80
400
2
125
250
2 3 1 1 1 1 1 1 1 1 1 1
330 125 240 240 80 50 125 31.5 31.5 125 63 80
660 330 240 240 80 50 125 31.5 31.5 125 63 80
Bihar 1
Gaya
2
Biharshariff
3 4
Kahalgaon Muzaffarpur
5
Patna
6 7 8 9
New Purnea Barh Banka Lakhisarai
10
Pusauli
11
Kishanganj
765 400 400 400 400 400 400 400 400 400 400 400 400 765 400 400 Jharkhand
1
Ranchi (New)
2 3 4
Maithon Maithon RB (MPL I & II) Jamshedpur
5
Ranchi
6 7
Koderma Chaibasa Chandwa (Jharkhand Pooling )
8
Odisha 1
Angul
765 400
2
Jharsuguda
765
3
Bolangir
400
4
Rourkela
400
5
Rengali
6
Jeypore
7
Keonjhar
33 33 400 400 400
105
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Existing reactor details Sl. No
Name of the substaion
Voltage level (kV)
8 9 10 11
Jharsuguda Indravati Duburi JITPL
400 400 400 400
12
Pandiaballi
400
13
Baripada
400
no of units
capacity of each unit (MVAr)
Total capacity (MVAr)
2 1 1 2 1 1 1
125 125 80 50 80 63 125
250 125 80 100 80 63 125
2 1
80 63
160 63
2 3 1 1 1 1 2 1 2 1 2 1 2
50 16.77 50 50 50 50 50 80 125 80 50 50 125
100 50.31 50 50 50 50 100 80 250 80 100 50 250
Sikkim 1 2
Rangpo New Melli
400 220 West Bengal
1 2 3 4 5 6 7 8 9 10 11 12 13
106
Farakka Parulia Bidhannagar Bakreswar Jeerat Arambagh Ragunathpur Kharagpur Binaguri Behrampur KTPS Durgapur Alipurduar
PRDC Bangalore
400 400 400 400 400 400 400 400 400 400 400 400 400
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table E: State wise list of line reactor present in the eastern region grid Existing reactor details Sl No
Name of the transmission line
Voltag e level (kV)
No. of units
capacity of each unit (MVAr)
Total capacity (MVAr)
End
Remarks
Bihar 400
2
50
100
Gaya
Switchable
400
2
50
100
Maithon
Switchable
Purnea to Kishanganj-I
400
1
63
63
Purnea
-
3
Purnea to Binaguri-III
400
1
63
63
Purnea
-
Purnea to Muzaffarpur I & II
400
2
63
126
4
400
2
63
126
400
1
63
63
400
1
50
50
400
2
50
100
Purnea Muzaffarpu r Muzaffarpu r Muzaffarpu r Balia
765
1
310
240
Pasuali
-
765
1
330
330
Fatehpur
-
1
Maithon to Gaya I & II
2
Switchable
7
Muzaffarpur to Gorakhpur I Muzaffarpur to Gorakhpur II Biharshariff to Balia I & II
8
Pasuali-Fatehpur
9
400
2
50
100
Banka
-
400
2
80
160
Biharshariff
-
400
2
50
100
Biharshariff
-
400
2
63
100
Patna
-
400
2
50
100
Lakhisarai
-
14
Banka to Biharshariff I & II Biharshariff to Purnea I & II Lakhisarai to Biharshariff I & II Barh to Patna I & II Lakhisarai to Kahalgaon I & II Biharshariff to Tenughat
220
1
50
50
Tenughat
-
15
Biharshariff to Pusauli I
400
1
50
50
Biharshariff
Switchable
16
Pasauli to Allahabad
400
1
63
63
Pasauli
Switchable
17
Pasauli to Sarnath
400
1
63
63
Pasauli
Switchable
18
Patna to Balia III & IV Pasauli to Biharshariff I & II
400
2
50
126
Balia
-
400
2
63
126
Pasauli
-
20
Patna to Krishanganj I & II
400
1
63
63
Patna
Switchable
1
63
63
Switchable
1
63
63
21
Patna to Krishanganj I & II
400 1
63
63
Patna Kishangau nj Kishangau nj
2
50
100
Biharshariff
Switchable
1
240
240
Gaya
Switchable
1
330
330
Balia
-
1
240
240
Gaya
Switchable
5 6
10 11 12 13
19
22
Biharshariff to Varanasi I & II
400
23
Gaya to Balia
765
24
Gaya to Varanasi-I
765
107
PRDC Bangalore
Switchable Switchable -
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Existing reactor details Sl No
Name of the transmission line
Voltag e level (kV)
25
Gaya to Varanasi-II
765
No. of units
capacity of each unit (MVAr)
Total capacity (MVAr)
End
240
480
Gaya
Switchable
Switchable
-
2
Remarks
Jharkhand 1
240
240
1
330
330
1
240
240
1
330
330
2
80
160
Ranchi Dharamjay garh Ranchi Dharamjay garh Ranchi
2
80
160
Sipat
2
50
100
MPL
2
50
100
Ranchi
400
2
50
100
Maithon
-
400
1
50
50
Maithon
Switchable
400
1
63
63
Chaibasa
2
240
480
2
240
480
Jharsugud a Angul
400
2
80
160
Gajuwaka
400
1
63
63
Mendasal
Baripada to Pandiabill
400
1
63
63
Baripada
36
Rourkel to Jharsuguda I
400
1
63
63
Rourkela
-
37
Rourkel to Sterlite I
400
1
63
63
-
Meramundali to Angul I
400
1
80
80
Meramundali to Vedanta
400
2
50
100
Angul to Bolangir
400
1
50
50
Rourkela Meramund ali Meramund ali Bolangir
400
1
50
50
Bolangir
400
1
80
80
Jeypore
Ranchi (New) to Dharmjaygarh I
26
765 27
Ranchi (New) to Dharmjaygarh II
28
Ranchi to Sipat-I & II
400
29
Maithon RB (MPL) to Ranchi I & II
400
31
Maithon to Kahalgaon-I & II Maithon to Mejia I
32
Kharagpur to Chaibasa
30
Switchable -
-
Odisha 33 34 35
Jharsuguda to Angul-I & II Jeypore to Gajuwaka I & II Pandiabill to Mendhasal
765
38 39
Switchable Switchable -
-
-
40
Bolangir to Jeypore
41
Rourkela to Talcher I & II
400
2
50
100
TSTPP
-
42
Keonjhar to Rengali
400
1
63
63
Rengali
-
43
Rengali to Indravati
400
2
50
100
Rengali
1
50
50
Indravati
44
Rourkela to Chaibasa-I
400
1
50
50
Rourkela
Switchable
45
Baripada to Duburi Rourkela to Jamshedpur II
400
1
63
63
Baripada
-
400
1
50
50
Rourkela
Switchable
46
108
PRDC Bangalore
-
-
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Existing reactor details Sl No
Name of the transmission line
47
Baripada to Keonjhar Jharsuguda to Dharamjaygarh-I Jharsuguda to Dharamjaygarh-II
48 49
Voltag e level (kV)
No. of units
capacity of each unit (MVAr)
Total capacity (MVAr)
400
3
16.67
50.01
765
1
330
330
765
1
330
330
End
Remarks
Baripada Dharamjay garh Dharamjay garh
-
-
-
West Bengal 50
Behrampur to Jeerat-I
400
1
50
50
Jeerat
3
21
63
1
50
50
51
Sagardighi to Subashgram
400
52
Farakka to Parulia-I
400
1
50
50
Sagardighi Subashgra m Farakka
53
Bidhannagar to Parulia-I
400
3
16.7
50.01
Parilia
-
54
Bakreswar to Arambagh
400
1
63
63
Bakreswar
-
55
Bakreswar to Jeerat
400
1
63
63
Jeerat
-
56
Malda to Purnea I & II Binaguri to Bongaigaon- I & II Binaguri to Tala I & II
400
2
63
126
-
400
2
63
126
400
2
63
126
Malda Bongaigoa n Binaguri
400
1
63
63
Binagiri
-
400
2
80
160
Binagiri
Switchable
61
Binaguri to Tala IV Binaguri to Bongaigaon III & IV Ragunathpur to Ranchi
400
1
60
60
Ranchi_PG
-
62
Ragunathpur to Ranchi
400
1
60
60
Ranchi_PG
-
57 58 59 60
109
PRDC Bangalore
-
-
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table F: State wise list of load data considered for the study present in the eastern region grid 33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
Capacity of each unit (MVA)
Total capacity (MVA)
1 3 2 2 3 3 1 2 1 1
20 50 20 20 20 20 50 20 20 50
20 150 40 40 60 60 50 40 20 50
No. of units
MW
MVAr
50.81
16.70
16.09 31.75 12.70 31.75
4.99 13.86 6.35 10.44
12.70
6.35
33.87
11.14
Bihar 1
Arrah
132/33
2 3 4 5
Ataula (Arwal)(Karpi) Aurangabad Banjari Banka
132/33 132/33 132/33 132/33
6
Barauni TPS
132/33
7
Barh
132/33
8
Baripahari
132/33
2
50
100
64.56
21.22
9
Belaganj
132/33
2
20
40
8.47
2.75
10
Bettiah
132/33 132/33
88.91
29.15
12
Bikramganj
132/33
23.38
1.34
13
Buxar
132/33
28.19
10.64
14
Chandauti (Gaya)
132/33 132/25
63.51 1.06
25.50 0.41
15
Chhapra
132/33
40.22
13.22
16 17 18 19
Darbhanga (old) Dhaka Dalsingsarai Digha
132/33 132/33 132/33 132/33
21.17 15.88 22.97 55.03
6.95 4.85 6.25 18.07
20
Dumraon
132/33
28.58
4.80
21 22
Ekma Ekanga Sarai (Ekanagar)
132/33 132/33
6.35 21.17
1.91 4.23
23
Forbeshganj
132/33
42.34
1.63
24 25 26 27 28 29 30
Goh Gangwara Gaighat Hazipur Hulasganj Harnaut Hathidah
132/33 132/33 132/33 132/33 132/33 132/33 132/33
40 50 150 40 50 40 50 100 26.7 40 50 100 60 40 150 20 50 20 60 20 50 40 100 100 150 40 40 60
7.56
Bihta
20 50 50 20 50 20 50 50 13.35 20 50 50 20 20 50 20 50 20 20 20 50 20 50 50 50 20 20 20
22.99
11
2 1 3 2 1 2 1 2 2 2 1 2 3 2 3 1 1 1 3 1 1 2 2 2 3 2 2 3
11.93 44.03 66.69 57.16 19.71 19.55 23.50
3.87 5.73 15.12 18.34 4.55 12.12 7.65
110
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
31 32 33 34 35 36 37 38 39
Imamganj Jagdishpur Jandaha Jainagar
132/33 132/33 132/33 132/33
Jakkanpur
132/33
Jamalpur Jamui Jehanabad
132/33 132/33 132/33
40
Kahalgaon
132/33
41
132/33 Karmnasa
42
132/25
43
Kataiya
132/33
44
Katihar
132/33
45 46 47 48 49
Katra Kusheshwarsthan Kochas Karbigahiya Kudra
132/33 132/33 132/33 132/33 132/33
50
Khagaria
132/33
51
Kishanganj
132/33
52 53 54 55
Lakhisarai Madhubani Masaurhi Mithapur
132/33 132/33 132/33 132/33
56
Mohania
132/33
57
Motihari
132/33
58 59 60 61
Masrakh Muzaffarpur Nalanda Naugachhia
132/33 132/33 132/33 132/33
62
Nawada
132/33
63
Pandaul
132/33
64
Phulparas
132/33
111
PRDC Bangalore
2 2 2 3 4 1 2 2 2 2 2 2 1 1 1 3 3 1 3 2 2 4 2 2 1 1 1 3 2 2 2 1 1 1 1 2 3 2 3 1 3 2 1
Capacity of each unit (MVA) 20 20 20 20 50 20 50 20 20 20 50 50 20 21.6 20 20 20 50 50 20 20 50 20 20 50 50 20 20 20 20 50 50 20 20 50 20 50 20 20 20 50 20 50
2
20
No. of units
Total capacity (MVA)
MW
MVAr
40 40 40 60 200 20 100 40 40 40 100 100 20 21.6 20 60 60 50 150 40 40 200 40 40 50 50 20 60 40 40 100 50 20 20 50 40 150 40 60 20 150 40 50
13.34 19.37 16.09 12.91 95.17
4.10 5.29 3.39 4.21 30.01
30.48 31.75 21.22
9.95 10.36 4.27
29.64
14.82
40
23.82
6.59
0.26
0.77
30.38
7.11
25.93
8.46
74.73 12.92 12.82 58.75 13.89
11.54 4.23 2.45 19.02 3.90
14.07
2.29
21.17
6.29
38.11 8.47 15.88 46.57
12.44 2.76 16.91 15.08
32.04
9.26
45.38
14.51
15.88 65.63 26.67 20.64
3.28 21.42 8.76 5.40
41.81
8.19
22.79
2.22
25.40
8.35
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
65
Purnea
Voltage level (kV)
132/33
No. of units
Capacity of each unit (MVA)
Total capacity (MVA)
MW
MVAr
1
20
20
55.04
18.09
50 50 20 20 20 20
100 50 20 40 40 40
15.88
5.19
26.57 28.52 7.30
8.66 9.29 2.40
66
Rafiganj
132/33
67 68 69
132/33 132/33 132/33 132/33
2
20
40
7.62
2.48
71 72 73 74 75 76 77 78 79 80
Rajgir Ramnagar Raxaul Remi nagar (Runni Saidpur) Sherghati SKMCH Sonebarsa Sabour Saharsa Samastipur Sasaram Shekhpura Sheetalpur Sitamarhi
2 1 1 2 2 2
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
6.18 21.30 3.72 21.76 9.54 8.90 3.04 9.15 4.77 9.97
Siwan
132/33
40 100 40 150 20 40 100 40 40 150 20 100 50 20 21.6 20 40 100 60 40 40 40 40 40 50 100 100 150
23.96 65.28 10.62 66.69 25.40 28.79 31.75 28.05 10.58 30.59
81
20 50 20 50 20 20 50 20 20 50 20 50 50 20 21.6 20 20 50 20 20 20 20 20 20 50 50 50 50
47.63
15.66
40.49
13.38
10.58
2.83
16.63
4.57
25.40 6.35 12.55 9.31 16.94 12.62 54.49 24.87 42.13 61.39 120.6 7 35.25 61.39 0.00 31.42
5.09 0.86 2.95 2.01 5.94 5.45 4.32 8.12 13.27 54.12
97.00
21.05
70
84
Sultanganj
132/33
85 86 87 88 89 90 91 92 93 94
Supaul Tehta Tekari Udaikishanganj Vaishali Wazirganj BodhGaya Dehri GopalGanj Begusarai
132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33 132/33
2 2 2 3 1 2 2 2 2 3 1 2 1 1 1 1 2 2 3 2 2 2 2 2 1 2 2 3
95
Khagaul
132/33
5
50
250
96 97 98
Sipar Fatuha Bihar Sarif
132/33 132/33 132/33
99
Madhepura
132/33
100
Pussori New
132/33
2 3 1 2 1 1
50 50 20 20 100 50
100 150 20 40 100 50
82
132/33 Sonenagar
83
132/25
112
PRDC Bangalore
39.65 9.63 16.24 0.00 9.38
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
101
Benipatti
132/33
2
Capacity of each unit (MVA) 20
102
Belsand
132/33
1
103
Mahanar3
132/33
104
Sheohar
105
Kishanganj New
106 107 108 109 110 111 112 113
Banmakhi Hathua Narkatiyaganj Pupri Tarapur Trivenigaunj SamastipurN motipur
114 115
Total capacity (MVA)
MW
MVAr
40
4.93
0.13
10
10
6.51
2.14
2
20
40
6.12
1.99
132/33
2
50
100
9.02
2.93
132/33
1
50
50
9.38
1.19
20 20 20 20 20 20 50 50
40 40 40 40 40 40 100 150
6.13 10.58 3.75 1.52 15.88 4.39 5.48 9.18
1.30 3.48 1.23 0.50 4.13 0.54 0.75 2.17
Arrah Rly LakhisR
132/33 2 132/33 2 132/33 2 132/33 2 132/33 2 132/33 2 132/33 2 132/33 3 Traction 132/25 132/25
7.41 4.00
2.40 1.29
116
RafignR
132/25
3.40
1.10
117
DumarnR
132/25
3.00
0.54
118
HajiR
132/25
0.86
0.69
119
ChprR
132/25
6.49
2.10
120 121 122 123 124 125 126 127 128 129 130
KudraR Mokama Rly Railfactory Rly Khsurupur Rly Paharpur Rly KCL Rly JHAJA Rly Khagaul Rly Jehanabad_Railway Dalsingsarai_R Arrah RLY
132/25 132/25 132/25 132/25 132/25 132/25 132/25 133/25 132 132 132
3.80 7.00 10.00 6.00 2.90 0.80 10.00 4.00 3.83 2.70 5.00
1.23 2.27 2.97 1.97 1.86 2.00 3.28 1.34 0.23 0.18 1.61
No. of units
Bihar Industry 131
Ordinance Factory( Rajgir)
132
0.40
0.13
132
Samastipur Trac
132
3.80
0.15
133
RailLoacal Plant (vaisali)
132
3.02
1.50
134
Shree Cement
132
18.00
2.91
135
Surajpur
132
21.76
7.16
136
Chandauli
132
0.00
0.00
137
BharatSM_Gen
132
0.00
0.00
113
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
138
Hasanpur SMG
139
Voltage level (kV)
No. of units
Capacity of each unit (MVA)
Total capacity (MVA)
MW
MVAr
132
0.00
0.00
SUGAULI
132
0.07
0.02
140
LAURIYA
132
0.07
0.02
141
Swdesi Sugarmill Gen
132
0.00
0.00
142
Narinagar SugerMill
132
0.60
0.20
1
Chaibasa
2
Lalmatiya
3 4
Adityapur Chakradharpur
5
Dalbhumgarh
6 7 8 9
Chaibasa Chandil II/ Maniq Deogarh Dumka(Maharo)
10
Garhwa Rd
11
Goielkara
12 13
Golmuri Gumla
Jharkhand 132/33 2 1 132/33 2 132/33 4 132/33 1 132/33 2 Railway feeder 132/33 1 132/33 2 132/33 3 132/33 2 1 132/33 1 132/33 1 Railway feeder 132/33 2 132/33 2
14
Hatia old
132/33
15 16
Tamar Madhupur
132/33 132/33
17
Jadugoda
132/33
18
Jamtara
132/33
19
Japla
Railway feeder 132/33
20
Kamdara
132/33
21
Kanke
132/33
22
Kendposi
132/33
23 24
Latehar Lohardaga
114
PRDC Bangalore
Railway feeder 132/33 132/33
50 20 50 50 20
100
8.79
2.89
120
25.00
8.21
200 20
89.43 8.00 37.20
-13.30 6.62 23.17
50
100
6.00
2.03
25
25
50 50 50 20 20
150 100
6.00 51.00 30.00 20.00
1.98 16.33 8.10 5.78
70
42.00
5.98
20
12.00
3.94
3.00
0.99 11.17 5.77
50 20
100 40
4
50
200
2 2 2 1 1 1
50 50 20 50 50 20
100 100
34.00 17.57 105.0 0 13.00 16.40
90
21.00
6.90
70
25.20
4.42
8.00
1.40
40
16.00
2.28
60
30.50
10.50
100
33.10
9.42
90
28.00
9.19
6.00
1.97
1.60 31.70
0.53 10.42
2 2 1 2 2 1
2 2
20 20 20 50 20 50
50 50
100 100
34.51 0.33 3.40
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
25 26 27 28
Namkum Nowamundi Nowamundi Tata Steel Pakur
29
Rajkharsawan
30 31 32 33 34 35 36 37 38 39 40 41
Voltage level (kV)
4 1 2 2
50 50
Sahebgunj Daltonganj Manoharpur_JUSNL Sikidri_JUSNL Saljagiri RLY Shankarpur RLY_deogarh Tatisiloi RLY Tolra RLY Lodhma RLY Bakaspur RLY Chakradharpur RLY Bano RLY
132/33 132/33 132 132/33 132/33 Railway feeder 132/33 132/33 132/33 132/33 132/25 132/25 132/25 132/25 132/25 132/25 132/25 132/25
Capacity of each unit (MVA) 50 50
42
Umi Rly
132/25
43
Pakur Rly
No. of units
Total capacity (MVA) 200 50 100 100
MW
MVAr
93.20 0.00 0.00 23.07 0.00
39.25 0.00 0.00 6.69 0.00
8.30
3.16 3.61 14.14 5.95 8.00 0.00 0.65 5.23 2.28 0.25 0.99 3.10 0.00
2 2
50 50
100 100
-
-
-
10.53 43.00 4.00 9.50 0.00 3.00 10.80 16.00 2.63 3.00 9.36 0.00
-
-
-
2.90
2.08
0.02
0.22
46.64
24.84
9.67 4.50 5.80
4.92 2.23 1.73
38.99
18.85
8.55 11.15 5.30 30.00 37.91 21.70 13.80 78.19 15.15 95.71
8.55 2.97 1.67 8.54 27.96 4.99 2.55 24.65 3.80 25.30
21.21 37.95
7.05 16.13
9.41
3.84
132 DVC
44
Patherdih
45 46
Pattratu (DVC) Gola
47
K'Dubi
48
Konar
49 50 51 52
Biada BTPS'B Dhanbad Jamshedpur
53
Koderma
54
Ramgarh
55 56
Mosabani Ramgarh_33
1
HEC Hatia
115
PRDC Bangalore
132/33 132/25 132/33 132/33 132/33 132/25 132/33 132/25 132/33 220 220/33 132/33
2 1
80 50
160 50
1 2 2 1
31.5 50 50 80
31.5 100 100 80
1
20
20
2
80
160
80 45 80 50 80 50 20 50
160 135 80 50 160 50 40 100
2 3 1 132/33 1 132/33 2 132/33 1 132/33 2 220/33 2 JUSNL Industry 132
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
No. of units
Capacity of each unit (MVA)
Total capacity (MVA)
MW
MVAr
18.60 16.22 5.00
6.11 12.91 1.64 28.31 11.94 3.01 3.00 15.60 10.40
2 3 4
Ushamartin APL Ramchandrapur ECL_Lalmatya_JUSNL
1
GIRDHI
2 3 4 5
North Karanpura Govindpur Hazaribag Nimghat
132 132 132 DVC industry 132/33 220/33 132/33 132 132/33 132/33
6
Putki
132/33
7
Barhi DVC
132/33
93.54 27.35 9.91 50.60 47.23 33.00 145.5 0 47.00
8 9 10 11 12
CTPS MHS-RB3 Panchet Maniq Railway Jamshedpur
132/33 132/33 132/33 132 220/132
89.54 12.35 11.90 2.09 17.50
27.24 3.54 0.59 0.65 52.91
13
JSPL
132
3.89
14
TISCO
15 16
Maniq DVC PDIL
132 132
17
BSL_DVC
220
19.73 253.0 0 11.50 0.19 130.0 0
1
132
0.00
0.00
132
9.84
2.84
3 4 5 6
ECRBR-D ECRly North Karanpura DVC BSL-DVC ElctrDVC /Dhanbad Nimiaghat Railway ECR Gomia
132 220 132/25 132
0.00 32.30 5.00 0.29
0.00 29.10 1.84 -0.14
7
MAL-Impex
132
36.00
4.00
8 9 10 11 12
Sermuri DVC Pradhankant BSLGD Rajbera DVC E C RLY(from sindri DVC)
132 132 132 132 132
4.21 3.50 0.00 9.50 6.48
2.22 2.50 0.00 4.41 0.90
15.00
0.78
73.39
22.84
2.50
0.06
400/132
65.50 22.00
17.43 -2.42 0.62 68.00
Traction 2
Odisha 1
Mendhasal
2
Balasore
116
PRDC Bangalore
220/33
1 2 132/33 1 Railway Feeder
20 63 40
20 166
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
3
Name of the Sub-Station
Bhadrak
4
Bidanasi
5
Budhipadar
6
Chandaka
7
Jayanagar
8
Joda
9
Narendrapur
10 11
Paradip
12
Theruvali
13
Balimela
14
Barkote
15
Nayagarh
16 17
Duburi Akhusingh
18
Anandapur
19
Angul
20
Argul
21 22
Atri Aska
23
Balugaon
24
Banki
25
Barbil
26
Baragarh
117
PRDC Bangalore
Voltage level (kV)
Capacity of each unit (MVA) 2 63 132/33 1 40 Railway Feeder 2 63 132/33 1 40 132/33 1 20 2 63 132/33 1 40 2 20 132/33 1 12.5 Railway trac ChakusTr 3 20 132/33 1 40 1 100 220/132 2 160 2 40 132/33 1 20 Railway (JagnathTr) 2 20 132/33 1 12.5 132/33 2 12.5 1 20 220/33 1 40 220/33 2 40 1 40 220/33 2 20 220/33 2 40 132/33 2 12.5 2 12.5 132/33 1 20 2 40 132/33 1 20 1 40 132/33 1 20 132/33 1 20 132/33 3 40 1 40 132/33 1 20 1 12.5 Railway feeder (Solar trac) 132/33 2 20 132/33 2 12.5 traction 132/33 3 40 No. of units
Total capacity (MVA)
MW
MVAr
54.31
15.62
5.73 74.70
0.53 30.40
20
6.20
0.67
166
91.00
31.38
34.80
23.40
2.80 0.00
-12.50 0.00
100
18.75
5.65
520
27.80
8.90
4.32
7.34
52.5
28.50
7.20
25
12.00
2.22
60
14.40
1.91
80
15.00
3.92
80
75.90
23.90
80 25
9.92 10.00
3.00 2.50
45
16.54
4.63
100
30.40
10.17
60
1.20
-0.80
20 120
0.00 27.00
0.00 13.76
30.15
7.92
4.41 10.80 7.44 2.40 53.05
1.20 2.20 2.90 7.75 25.69
166 166
52.5
72.5 40 25 120
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
27
Baripada
28
Barpalli
29
Berhampore
30
Basta
31
Bhanjanagar
32 33
Bhawanipatna Bhubaneswar (BBSR)
34
Boinda
35
Boudh
36
Bolangir
37
Brajrajnagar
38 39
Chainpal
40 41
Chandikhole Chhandpur
42
Chhatrapur
43
Chhend
44 Choudwar 45 46 47 48 49
Cuttack Dabugaon
50
Digapahandi
51 52
Ganjam Ganjam_132
53
Jagatsinghpur
55
Dhenkanal
Jajpur road
118
PRDC Bangalore
Voltage level (kV)
Capacity of each unit (MVA) 132/33 3 40 1 20 132/33 1 40 2 40 132/33 1 20 1 12.5 132/33 1 20 2 40 132/33 1 16 132/33 2 12.5 132/33 3 63 1 20 132/33 2 12.5 132/33 1 20 2 40 132/33 1 12.5 1 40 132/33 3 20 132/11 1 12.5 2 40 132/33 1 20 132/33 3 20 132/33 2 12.5 132/33 3 20 Railway Traction Feeder ( Ramba trac ) 132/33 3 40 Railway Traction Feeder ( Naugaon trac. ) 1 20 132/33 2 40 Railway Traction Feeder ( Kendpur trac. ) 132/33 3 40 132/33 2 12.5 132/33 3 40 traction (JorndaTr) 2 20 132/33 1 12.5 132/33 2 12.5 132 2 20 132/33 1 40 Railway Traction Feeder (Goreknath Trac.) 132/33 2 40 No. of units
Total capacity (MVA)
MW
MVAr
120
69.00
24.00
60
32.18
13.48
100
44.81
15.63
32.5
13.00
3.42
96
23.76
5.34
25 189
6.66 94.00
2.59 28.53
45
18.40
4.20
20
4.90
1.34
92.5
61.10
17.98
100
43.45
15.87
12.5
3.72
1.26
100
49.23
14.94
60 25
34.30 9.40 33.73
8.60 2.00 14.46
2.33
2.28
60.02
18.60
0.07
4.27
26.98
9.07
7.30
1.70
120 25 120
40.00 6.50 57.39 4.71
10.16 0.72 21.54 3.51
52.5
32.75
10.12
25
7.43 10.30
2.53 1.26
80
32.20
8.48
7.80
2.70
37.84
16.34
60
120
100
100
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
56
Jajpur town
57
Jaleswar
58
Jharsuguda
59
Junagarh
60
Kalarangi
61
Kalunga
62
Kamakshyanagar
63
Karanjia
64
Kendrapara
65
Kesinga
66
Kesura/Badagada
67
Khariar
68
Khurda
69 70 71 73 74 75
Konark Kuchinda Lapanaga Mania Marshaghai Mohana
76
Nimapara
77
Nuapara
78
Nuapatna
79 80
Padampur Parlakhemundi
81
Patnagarh
82
Pattamundai
119
PRDC Bangalore
Voltage level (kV)
Capacity of each unit (MVA) 1 20 2 40 132/33 1 20 2 31.5 132/33 1 12.5 Railway Traction Feeder 132/33 1 40 1 20 132/11 1 12.5 Railway Traction Feeder 132/33 3 20 2 12.5 132/33 1 20 132/33 2 40 1 20 132/33 2 12.5 2 12.5 132/33 1 20 2 40 132/33 1 12.5 1 40 132/33 2 20 1 63 132/33 1 40 132/33 2 40 132/33 3 40 Railway Traction Feeder ( Kaipad trac ) 132/33 2 20 132/33 2 20 132/33 1 20 132/33 1 12.5 132/33 2 20 132/33 2 12.5 2 40 132/33 1 12.5 132/33 2 20 1 40 132/33 1 20 1 12.5 132/33 1 20 132/33 3 12.5 1 40 132/33 2 20 132/33 2 20 No. of units
Total capacity (MVA)
MW
MVAr
100
47.97
16.07
20.41
7.22
9.53 9.50
1.08 3.22
0.00
0.00
60
10.40 18.44
3.20 2.58
45
27.81
7.43
80
31.00
10.24
45
17.65
4.17
45
7.32
2.03
92.5
21.07
6.36
80
27.77
5.90
103
22.00
8.26
80 120
38.07 68.99
9.11 8.52
11.87
2.89
40 40 20 12.5 40 25
5.80 18.71 0.20 0.00 3.96 4.60
1.54 5.35 0.07 0.00 1.52 0.31
92.5
42.85
5.66
40
11.60
3.90
72.5
36.89
11.56
20 37.5
7.32 8.23
80
24.12
0.79 4.47 6.08
52.5
30.72
75.5 40 20 12.5
7.06
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
83
Phulbani
132/33
84
Phulnakhara
132/33
85
Polasapanga
132/33
86 87 88 89
Polasapanga_132 Puri Purusottampur Rairakhole
90
Rairangpur
91 92
Rajgangpur
93
Ranasinghpur
94 95
Rayagada Rourkela
3 40 2 12.5 2 12.5 2 20 132/33 1 12.5 132/33 3 40 Railway Traction Feeder 2 63 132/33 1 40 132/33 2 12.5 132/33 4 35 132/25 1 Railway Tr 1 10 132/33 1 12.5 2 20 132/33 1 12.5 2 31.5 132/33 1 40 132/33 2 31.5 132/33 3 132/33 1 12.5
Saintala
97
Salipur
98
Sambalpur
99 100
Shamuka Sijua Somnathpur
101
Sonepur
132/33
102
Soro
132/33
103
Sunabeda
132/33
104
Sundargarh
132/33
105
Tentulikhunti
132/33
106 107 108 109 110
Tarkera Umerkote Bolani REN Laksmi
111
Katpali
132/33 132/33 132/11 220/33 220/33 132/33 132/33
PRDC Bangalore
1 2 1 2 1 2
Capacity of each unit (MVA) 12.5 12.5 40 20 40 20
132/33 132/33 132/33
96
120
No. of units
3
20
1 2 3 1 1 1 1 1 2 2 2 1 2 1
40 20 12.5 40 20 20 12.5 12.5 20 10 20 20 20 40
Total capacity (MVA)
MW
MVAr
65
20.45
4.05
40
14.22
4.21
80
36.40
8.90
120 25 25
11.20 36.00 12.20 11.75
0.69 10.20 3.30 2.82
52.5
6.50
0.80
120
52.72 2.68
10.10 2.45
166
72.00
12.00
25 140
6.45 36.60
2.30 9.30
1.60
2.39
22.5
2.80
0.14
52.5
29.80
9.30
103
75.40
18.65
9.52
1.00
12.5
5.29
1.75
60
25.08
7.51
80
39.19
11.99
37.5
23.60
5.00
60
32.00
7.00
32.5
15.74
4.16
12.5 40 20 40 20
0.00 16.20 2.22 5.05 6.98
0.00 5.10 0.40 1.08 1.40
60
37.20
13.80
63
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
112 113
Bolangir_New Rengli
132/33 132/33
1 2
Capacity of each unit (MVA) 12.5 20
114
Smangara
132/33
2
115
Rajgangpur
132/33 3 Traction Load 132 132 132 132 132 132 132 132 132 Railwa 132 y 132 Bulk Load 132 132 132 132 132 132 132 132 132 132 132 220 132 132 132 132 132 132 132 132 132 220 132 132 132 132 220
1 2 3 4 5 6 7 8 9
BhultaTraction Meramandali TR Jakhpur Traction ( Dubri ) Dharma Traction Tomka Trac Padwa Tr Manbar Trac. Maling Tr KeonjharTr
10
Talcher_R
11
Bamra Tr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
IMFA1 Damanjod IRE FCI Baminpl Balasore Alloy BirlaTyr PPL L&T Cem co Power Max MCL Chandiposh J K Paper FAP-Joda HAL BRG M L Rungta PPT RAW MET Hind Metalic MESCO ROHIT Adhunik Dahmra Prt OCL_TA Saliban (Bhuvi Profile) ESSAR
121
PRDC Bangalore
Voltage level (kV)
No. of units
Total capacity (MVA)
MW
MVAr
12.5 40
1.90 14.00
0.13 3.06
20
40
10.70
14.30
40
120
0.02
-0.54
5.48 7.40 16.00 2.60 0.00 5.00 5.00 5.00 4.20
1.80 1.90 8.00 1.01 0.00 1.64 1.64 1.64 2.79
4.20
1.10
0.00
0.00
44.00 43.41 6.05 0.40 9.92 44.78 3.66 10.00 1.79 0.69 17.00 3.00 0.02 15.94 3.42 12.50 0.01 12.00 11.09 0.00 3.56 30.75 19.27 2.94 7.78 1.49 4.00
14.66 -30.10 1.83 0.19 0.50 3.17 0.24 0.96 0.50 0.23 3.00 0.08 0.55 1.13 0.57 5.60 0.30 4.74 -4.44 0.00 1.18 2.00 6.39 0.69 2.58 0.50 2.09
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
28 29 30 31 32 33 34
IOCL Jabamaye Fe Beekay Steels Arya Bansapani BC-monty Saintla
220 132 132 132 132 132 132
35
Tata Steel
220
36 37 38 39 40 41 42 43 44 45 46
BRPL MSL VVC JSPL Greed Steel BRP-St Basundra Utkal Aluminum Adity Aluminum Salibani SPS
47
No. of units
Capacity of each unit (MVA)
Total capacity (MVA)
MW
MVAr 0.48 0.87 2.58 2.15 0.93 0.50 0.16
132 132 132 220 132 132 220 220 220 132 220
0.50 2.63 7.78 6.48 2.26 9.92 3.63 134.8 9 7.35 3.23 0.00 44.00 0.00 3.47 2.00 0.00 0.00 16.57 0.99
Nandira
132
24.70
2.80
48 49 50 51 52 53
Sterling Chiplma Remja Load ( Budhipadar) Joda_SMPL( Joda) RSP_220 CTC_Feeder(BBSR)
400 132 132 132 220 132
0.00 19.00 43.00 0.31 54.39 20.83
0.00 6.30 16.00 0.20 27.12 9.18
1 2 3 4 5 6 7 8 9 10 11
Vedanta FACOR RSP ACC Bhusan#1G Bhusan#2G NBVL IFFCO NINL2 Maheswri Shyam DRI
0.00 0.00 0.00 8.98 11.60 17.41 18.86 1.64 0.00 0.00 0.00
12
JINDAL
13 14 15
KMCLG ICCL#1G RSP#1G
0.00 0.00 0.00 26.54 34.30 51.50 55.80 5.00 0.00 0.00 0.00 115.0 0 24.86 58.22 43.00
10.00 2.44 0.83 0.00 14.50 0.00 1.15 0.57 0.00 0.00 2.93 -1.00
CGP
122
PRDC Bangalore
132 132 132 132 220/11 220/11 132 132 220 132 132 220 33/11 132/11 132/11
38.88 8.64 19.67 14.50
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
16 17
RSP#2G RSP#G3-7
18
NALCO#1G
19
Veda_135
220
20 21 22 23 24 25 26 27
MSP AryanISt Bhusan2 EMAMI maithan2 SMC1 OPCL MERAMDL3
132 132 220 132 220 132 132 132
28
JSPLG
132
29
HinlcoG
132
30 31 32 33 34
BSSL ICCL1 ICCL#3G AryaIspt SDRI_GEN
220 132 132 132 132
35
BHU3G
132
36 37 38 39 40 41 42 43 44 45 46 47
BHU5G EMAMIG EMAM2G ICCL#2G maheIsG IFFCOG VEDNT_GN RathiG visastlG MAITHN MSPG INDAL#1G
132 132 132 132 132 132 132 132 132 132 132 132
48
INDAL#2G
132
49 50 51 52 53 54 55
AARTI#1 OCL-Raj BSSL2G BSSL1 Facor NINL SMCG
132 132 132 132 132 132 132
123
PRDC Bangalore
Voltage level (kV)
No. of units
Capacity of each unit (MVA)
Total capacity (MVA)
MW
MVAr
132/11 132/11
43.00 68.00
14.50 22.90
220/10.5
884.0 0
290.5 5
706.0 0 0.00 2.62 66.00 0.00 0.00 0.00 9.60 0.00 649.0 0 311.0 0 0.00 0.00 20.39 14.57 24.96 120.0 0 9.60 10.75 2.50 41.25 6.51 24.43 74.89 0.00 64.20 16.00 9.50 55.36 216.3 0 48.81 36.43 38.77 11.87 32.58 15.00 4.00
238.7 2 0.00 -3.00 21.69 0.00 0.00 0.00 3.24 0.00 219.4 4 105.1 6 0.00 0.00 6.90 4.93 8.44 40.60 3.25 3.63 0.84 13.95 2.20 8.26 25.32 0.00 22.37 5.41 3.21 18.72 73.14 16.50 12.32 13.10 4.01 11.02 5.06 1.34
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
56 57 58 59 60 61 62
SMCG2 SrigaG ActIspG2 ActnIsG JSPL_4 BSSP3G ActIspG3
132 132 132 132 132 132 132
63
Sterlite
132
64
BPPLGEN
132
65
BPPLGEN2
132
66
TSAlloy
132
No. of units
Capacity of each unit (MVA)
Total capacity (MVA)
MW
MVAr
17.10 14.57 16.61 10.00 0.00 23.07 62.16 289.0 0 125.0 0 125.0 0 0.00
5.78 4.93 5.62 3.38 0.00 7.79 21.00
1.42
0.36
4.99
1.25
8.55
2.14
4.99 1.07
1.25 0.27
6.77
1.73
2.14 1.07 2.14 1.07 1.07 1.07 2.85 4.99 2.14 2.14 2.85 2.85
0.55 0.27 0.55 0.27 0.27 0.27 0.73 1.25 0.55 0.55 0.73 0.73
2.85
0.73
66.00 30.00 104.4 0 16.00
12.00 10.00
41.89 18.33 18.33 0.00
Sikkim 1
Phodong
66/11
2
Bulbuley
66/11
3
Sichey
66/11
4 5
Tadong Rongly
66/11 66/11
6
Mamring
66/11
7 8 9 10 11 12 13 14 15 16 17 18
Melli Namchi Rabangla Rothak Soreng Geyzing Purano Namchi Pakyong Pelling Rhenock Mangan Ranipool
19
Topakhani
66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11 66/11
1 1 2 2 1 3 2 1 1 1 2 2 1 2 2 2 2 1 1 1 2 2 1 1
5 2.5 10 10 5 5 2.5 10 7.5 15 5 2.5 5 2.5 2.5 2.5 7.5 10 5 5 5 7.5 7.5 5
5 2.5 20 20 5 15 5 10 7.5 15 10 5 5 5 5 5 15 10 5 5 10 15 7.5 5
West Bengal 1 2
Arambagh Bakreswar
132/33 220/33
3 1
50 50
150 50
3
Asansol
132/33
3
50
150
4
New_Bishnupur
132/33
2
31.5
63
124
PRDC Bangalore
41.42 6.00
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
5 6 7 8 9
Dalkhola Dharampur Domjur Gokarna Howrah
132/33 132/33 132/33 132/33 132/25
10
Krishnagar
132/33
Laxmikantpur
132/33
Laxmikantpur_railway
No. of units
Capacity of each unit (MVA) 20 50 50 50 20 50 31.5 31.5 50 12.5 31.5 50 50 50 50 50 31.5 31.5 50 50 50
12
New Haldia
13 14 15
New Jalpaiguri New town action area-III Rishra
132/25 132/33 132/33 132/33 220/33 132/33
16
Satgachia
132/33
17 18 19 20
Subhashgram Hura Foundry park Midnapur Kolkata leather complex (KLC)
132/33 132/33 132/33 132/33
3 2 3 3 2 2 1 1 1 2 1 1 2 2 3 2 1 2 2 2 2
132/33
3
50
2 1 2 2 1 1 1 1 2 2 2 1 4 2
50 31.5 20 16 20 31.5 31.5 50 50 7.5 50 20 12.5 50
3
50
11
21 22
Adisapthagram
132/33 Railway
23
Alipurduar
132/66 132/33
24
Amtala
25
Asoknagar
26 27 28
Bagnan GIS Bagmundi Balurghat
29
Bankura
30
Barasat
132/33 132/33 132/25 132/33 132/33 132/33 132/33 Railway 132/33
Total capacity (MVA)
MW
MVAr
60 100 150 150 40 100 31.5
26.50 80.30 79.00 63.80 8.00
8.46 14.38 17.03 21.12 2.33
93.00
30.56
81.5
77.86
25.81
25 31.5 50 100 100 150
14.13
3.36
44.00
14.46
54.00 48.00 71.02
17.75 8.00 23.34
131.5
48.00
15.77
63 100 100 100
60.92 17.80 26.00 64.50
8.68 5.85 8.50 21.20
150
66.50
8.00
131.5
87.79
10.57
40
15.28
8.73
52
13.38
6.30
31.5 31.5 50 100 15 100 20 50 100
4.02
0.21
59.00
19.55
70.50 0.40 48.80 4.40 26.20 50.40 7.50 120.0 0 4.00 110.8 6 88.00 24.00 98.50
11.68 0.13 16.03 4.30 5.71 7.20 3.20
150
Railway 31
Behala/ joka
132/33
3
50
150
32 33 34
Basirhat Belmuri Berhampore
132/33 132/33 132/33
2 2 3
50 31.5 50
100 63 150
125
PRDC Bangalore
30.07 1.31 25.77 15.59 2.67 29.40
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
35 36
Bighati Birsingha
37
Bishnupur (old)
39 40 41
Bolpur Bolpur_Prantik TSS Bongaon Barjora Chanditala
42
Chandrakora road
38
Voltage level (kV)
132/33 132/33 132/33 132/33 132/33 132/25 132/33 132/33 132/33 132/33 Railway 132/33 Railway 132/33 132/33
2 2 1 1 3
Capacity of each unit (MVA) 50 50 50 31.5 50
3 2 2 1 1
31.5 31.5 50 50 31.5
94.5 63 100
69.50 2.00 61.50 20.00 40.00
81.5
47.90
18.50
2
50
100
3 3 1 1 1
50 10 20 31.5 50
150 30
1.80 74.50 1.10 58.50 12.42
1.80 20.50 0.36 19.39 0.50
101.5
37.25
5.35
2.76 26.00 121.0 0
0.63 2.20
No. of units
Total capacity (MVA) 100 100 50 31.5 150
MW
MVAr
30.00 54.31
4.00 16.87
47.90
14.50 6.80 3.80 20.40 2.00 2.66
43
Contai
44 45
Coochbehar Darjeeling
46
Debogram
47
Dhulian
Railway 132/33
2
31.5
63
48
Egra
132/33
3
50
150
49
Falta
132/33
70.00
23.19
Gangarampur
132/33
72.5
40.45
18.60
81.5
20.40
6.75
51
Haldia
31.5 50 20 12.5 50 31.5 10 12.5 31.5 31.5 50 10 31.5 31.5 50 10 31.5 31.5 31.5 50 50 31.5
63 50
50
2 1 3 1 1 1 1 1 2 1 1 2 2 1 1 3 2 2 1 1 2 2
22.5
0.96
0.32
63
18.68
6.15
81.5
58.00
13.57
20 63 31.5 50 30 63 63
11.20 20.00
2.20 2.00
46.62
13.05
7.40 44.40 42.00
1.70 15.00 15.40
81.5
60.16
21.73
100 63
26.80 58.26
1.48 34.57
132/33
132/33 132/25 52
Haldia NIZ
53
Hizli
132/33 132/33
54
Jangipara
132/25 132/33
55
Jhargram
132/33
56 57 58
Kurseong Kakdwip Kalan
132/33 132/33 132/33
59
Kalyani
132/33
60 61
Khatra Katwa
132/33 132/33
126
PRDC Bangalore
6.51
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
Voltage level (kV)
Railway 132/33 132/33 132/25 132/33 132/33 132/25
1
Capacity of each unit (MVA) 50 31.5 50 12.5 31.5 50 20 31.5 50 50 31.5 50 31.5
63 150 25 63 150 40 63 50 50 31.5 150 63 94.5
48.60
18.00
141.5
62.99
7.55
63
30.00
9.86
113
46.00
15.12
100 150
63.60 54.00
20.90 17.74
83
44.00
14.46
25
4.30
1.41
101.5
67.00
22.02
63
22.98
5.33
No. of units
Total capacity (MVA)
MW
MVAr
0.30 32.00 51.00 11.60 30.00 83.00 18.00
0.17 10.50 16.89 5.60 16.00 27.50 5.92
48.03
13.10
30.50
10.02
95.00 48.00
41.67 18.00
50
62
Khanyan
63
Kolaghat
64
Lalgola
65
Lilooah
66
Mahachanda
132/33
67
Mathabhanga
132/33
68 69
Malda Mahishpota
132/33 132/33
2 3 2 2 3 2 2 1 1 1 3 2
70
Mankar
132/33
3
31.5
1
31.5
1
50
2 2 2 1 2 3 2 1 2 1 1 1 2 1
30 31.5 31.5 50 50 50 31.5 20 12.5 31.5 20 50 31.5 31.5
2
20
96.5
53.00
17.42
2 2 2
12.5 50 50
100 100
2 2 1 1 2
50 31.5 12.5 10 50
100 63
80.10 72.88 4.10 82.31 13.80
26.32 24.05 1.35 23.18 1.16
22.5
3.07
0.77
100
44.20
14.52
71
72
Maynaguri
74 75
Nazirpur North Bengal university (NBU) New town AA 1 Pingla
76
Purulia(WB)
73
132/33
132/33 132/33 132/33 132/33 132/33 132/25
77
Raghunathganj
132/33
78
Raghunathpur
132/33
79
Raigunj
132/33
80 81 82
Raina Rampurhat Rampurhat_railway
132/33 132/33 132 132/33 132/66
83
Ranaghat
132/25 84
Sainthia
127
PRDC Bangalore
132/33
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
85 86 87 88
Salt lake Salt lake GIS Samsi Siliguri
89
Sonarpur
90
Tamluk Tamluk
132/33 132/33 132/33 132/33 132/33 132/25 132/33 Railway
91
Tarakeswar
132/33
93 94 95 96 97
Titagarh Titagarh_railway Ujaano (NBU _ NEW ) Ukhra Uluberia Kuli Food Park
98
92
99 100 101 102 103 104 105 106 107 108 109
1
Voltage level (kV)
3 2 3 2 3 2 2
Capacity of each unit (MVA) 50 50 31.5 50 31.5 20 50
132/33 132/25 132/33 132/33 132/33 132/33 132/33
1 1 3 2 2 2 3 2 2
31.5 50 50 20 31.5 50 50 50 50
Birpara
132/66
3
20
Chalsa_66
132/66
1 1 2 2
20 10 20 50
Chalsa_33 Serakol Cossipur traction Balichak Dhatrigram Traction Kalingpong WBIDC_33 KhjrGIS3 Vidyasagar Park_33 TCF Bajkul
A Zone
2
B Zone
3
AB Zone
4
C Zone
5
C1 Zone
6
Bamunara SS
128
PRDC Bangalore
No. of units
132/33 132/33 132 132 132 66/33 132/33 2 31.5 132/33 2 50 220/33 2 50 132/33 2 20 132/33 2 50 DPL substations in West Bengal 132/11 1 20 132/11 2 31.5 132/33 1 50 132/11 5 31.5 132/33 1 31.5 132/33 1 50 132/33 1 50 132/11 3 31.5 132/33 1 50 132/11 2 31.5 132/33 2 50 132/34 2 50
Total capacity (MVA)
MW
MVAr
150 100 94.5 100 94.5 40 100
78.30 49.87 67.40 41.90 62.20 8.00 60.70 3.70
25.73 16.39 22.15 9.92 20.44 2.62 18.70 2.30
81.5
41.80
13.85
150 40 63 100 150 100 100
84.00 13.50 20.80 64.20 91.00 33.00 9.60
27.60 4.43 6.90 12.90 19.20 6.70 2.99
60
16.20
5.32
30
36.97
8.23
40 100
8.05 32.84 5.00 13.00 4.00 6.75 32.26 6.60 17.00 32.00 32.00
1.52 10.79 1.50 4.20 0.00 0.80 10.28 2.35 5.58 10.50 10.73
28.91
9.51
0.00 63.74
0.00 20.95 1.08
63 100 100 40 100 20 63 50 157.5 31.5 50 50 94.5 50 63 100 100
3.28 1.63 17.48 5.23 3.72 18.61 20.03
0.27 7.25 4.52 1.50 4.42 3.83
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
7 8 9
Shayam Stl (DPL_C) PCBL (DPL_AB) Shayam Ferro(DPL_C1)
1 2 3 4 5 6 7
Burnpur Purulia ASP Jamuria Kalipahari Kalyaneswari Mejia TPS
8
Barjora
9
Durgapur
10 11 12 13 14 15 16 17
DTPS_Waria DTPS_Waria_railway Belmuri_DVC Belmuri_DVC_railway Burdwan_DVC Burdwan_trac_railway Rumkanali_traction Tamla traction
18
IISCOD
19 20 21 22 23
Sonic thermal-DVC Badrinarayan Alloy Parulia Howrah_DVC_33 KGP_Traction_11
Voltage level (kV)
No. of units
Capacity of each unit (MVA)
132 132 132 West Bengal DVC substations 220/33 2 50 132/33 1 50 132 4 50 132/33 2 50 132/33 2 80 132/33 220/33 2 80 220/33 1 100 220/33 1 80 220/33 1 50 220/33 1 50 220/33 2 80 132/33 132/25 132/33 132/25 132/33 132/25 132/25 220
Total capacity (MVA)
100 50 200 100 160 160 100 80 50 50 160
220 132 132 220/33 132/33 132/25
MW
MVAr
18.61 16.43 33.71
6.12 10.14 4.79
0.90 17.43 36.18 70.90 57.66 85.00 48.00
0.60 2.61 14.52 5.40 18.55 18.00 13.70
81.37
5.53
126.0 0 13.40 8.32 0.70 17.81 74.00 3.00 4.00 31.00 111.2 0 51.71 8.60 56.00 0.00 0.06
8.00 2.16 2.62 0.85 5.85 11.82 6.00 1.09 9.00 4.41 1.57 2.70 4.32 0.00 0.20
CESC 1
EMSS
2 3 4
EMS-ter1 EMS-ter2 EMS-ter3
5
EMSS_T5
6 7 8 9 10
220/132 /33
132/33
BT Road
132/33
B.Garden
132/33
PRDC Bangalore
5
160
800
108
49
37.3 37.3 37.3 38.5
Belur
129
118 0 81 0
18.63 8549 18.05 18.05 18.05 18.63 8549 0.9 0 35 0
38.5
3
50
150
2
75
150
2
50
100
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
Name of the Sub-Station
11 12
Voltage level (kV)
132/33
No. of units
Capacity of each unit (MVA)
Total capacity (MVA)
MW
5
50
250
39
2
75
150
33
2
75
150
31.9
9.774 321 9.499 973 8.209 934 13.2 0.439 742 0 27 6.3 30
Titagarh(trs)
57
13 14 15
53 Dum Dum
132/33
Park lane
132/33
16
132/33
2 1 2
50 55 55
100 55 110
0 70 35 73
2
75
150
101
14.8
1 1 2
68 68 50
35 23 0
32 64 21
4 3.8 0 12.14 0686 3.452 144 16.35 4884 24.5 35 31.22 0607 19.65 7472 4.199 964 8.7 7.9 8.9
15.00 15.00 10.01 24.00 10.00 6.00 7.70 4.00 0.00 2.00 0.25
4.96 4.96 1.32 3.00 3.31 1.97 13.80 1.00 0.00 2.00 2.06
18
Jadavpore Jadavpore_2 Chakmir
19
Majerhat
132/33
20
BBD Bag
132/33
17
132/33
132/33 21
22
PRS
East Calcutta
175
37
132/33
1
75
132/33
2
50
100
50 75 50
100
70 39
75
95
55
110
129
75 75 75 75
75 150 150 75
23
NCGS
132/33
24
SRS
132/33
2
25
SRS_33
26 27 28
Patuli WBRS Park Circus
29 30 31 32 33 34 35 36 37 38 39
Resmi Bulk Tata Metalic SonarLal HNIZ MICL Ambuja Frakka Dankuni HPCL Madras Cement Rohit Ferro1 Manaksia Bencon
PRDC Bangalore
136
132/33
2 1 2
130
MVAr
1 132/33 2 132/33 2 132/33 1 West Bengal Bulk Load
82 39
21
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
33KV lump load
Substation details SI. No
40 41 42 43 44
Name of the Sub-Station
46 47
Rohit Ferro Modern BEL OCL_Midnapore Emami Cement Jayshree ( from liluahh_WB) BRGSteeel MCCPT
1
JK Nagar
45
131
PRDC Bangalore
Voltage level (kV)
No. of units
Capacity of each unit (MVA)
West Bengal IPCL Load 220/33 2 100
Total capacity (MVA)
200
MW
MVAr
0.00 9.10 15.40 1.00 0.80
0.00 0.38 5.06 0.00 0.60
10.43
3.45
1.30 21.00
0.50 4.00
45.00
9.14
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
ANNEXURE-II POWER MAP OF ER GRID AND ITS CONSTITUENTS STATES AND LINE LOADING DETAILS
132
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table G: 765 kV, 400 kV, 220 kV, 132 kV and 66 kV line flow (simulated result) of eastern region grid Sl. No
No. of ckts
FORWARD From Station
1 2 3 4
1 1 1 1
Fathepur Balia Gaya Gaya
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1
Varanasi Varanasi Banka Banka Biharshariff Biharshariff Biharshariff Biharshariff Biharshariff Biharshariff Biharshariff Balia Sasaram Sasaram Barh Barh Kahalgaon Kahalgaon Farraka Farraka Farraka Farraka Lakhisarai Lakhisarai Patna Patna Patna Patna Patna Patna Balia Balia Balia Balia Balia2 Barh Barh
133
PRDC Bangalore
To Station
MW
Bihar line loading 765 kV Sasaram 112.00 Gaya -286.00 Varanasi -163.70 Varanasi 163.49 400 kV Biharshariff 3.52 Biharshariff 8.48 Biharshariff 243.95 Biharshariff 243.95 Muzaffarpur 65.05 Muzaffarpur 65.05 Purnea LINE Purnea LINE Lakhisarai -172.76 Lakhisarai -172.76 Balia 83.48 Biharshariff -76.67 Biharshariff -270.65 Biharshariff -270.65 Kahalgaon -329.44 Kahalgaon -329.44 Banka 311.32 Banka 311.32 Kahalgaon 1.42 Kahalgaon 1.42 Kahalgaon 38.67 Kahalgaon 38.67 Kahalgaon -271.42 Kahalgaon -271.42 Kishanganj LINE Kishanganj LINE Barh -200.63 Barh -200.63 Barh -200.63 Barh -200.63 Patna -100.62 Patna -100.62 Patna -100.62 Patna -100.62 Brshrf-I -76.67 Gorakhpur 174.05 Gorakhpur 174.05
OWNER
MVAr
% LOADING
-534.18 -32.78 150.62 -167.01
14.5 7.6 5.8 11.2
PGCIL
-50.00 -58.92 -16.29 -16.29 -2.99 -2.99 IS IS 73.71 73.71 -85.15 -43.14 -58.97 -58.97 -58.84 -58.84 24.29 24.29 2.27 2.27 -3.67 -3.67 3.36 3.36 IS IS -69.54 -69.54 -69.54 -69.54 -38.74 -38.74 -38.74 -38.74 -43.14 -13.07 -13.07
7.5 4.8 27.6 27.6 10.9 10.9 0 0 21.2 21.2 6.7 6.7 31.8 31.8 19 19 35.4 35.4 6.4 6.4 7.2 7.2 30.8 30.8 0 0 12.1 12.1 12.1 12.1 6.6 6.6 6.6 6.6 6.7 13.9 13.9
PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61
No. of ckts 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1
62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sl. No
134
FORWARD From Station
To Station
Sarnath NabinagarRly NabinagarRly Allhabad Muzaffarpur Muzaffarpur Muzaffarpur Muzaffarpur Kishanganj Kishanganj Kishanganj Kishanganj Malda Malda Binaguri Binaguri Gaya Gaya Gaya Gaya
Sasaram -127.00 Sasaram LINE Sasaram LINE Sasaram -15.00 Gorakhpur 170.83 Gorakhpur 170.83 Purnea -515.23 Purnea -515.23 Purnea 317.30 Purnea 317.30 Binaguri -431.78 Binaguri -431.78 Purnea 47.16 Purnea 47.16 Purnea 294.11 Purnea 294.11 Mathn-I -220.02 Mathn-I -220.02 Koderma -116.57 Koderma -116.57 220kv line Biharshariff LINE Biharshariff LINE Gopalganj 160.62 Muzaffarpur -131.65 Muzaffarpur -131.65 Madhepura 62.64 Madhepura 62.64 Biharshariff 144.53 Biharshariff 144.53 Biharshariff 144.53 Khagaul 154.87 Pusauli -119.91 Dehri -71.35 Pusauli -146.31 Muzaffarpur 87.81 Muzaffarpur 87.81 Darbhanga LINE Dehri 84.31 Dehri 84.31 Bodhgaya 124.50 Bodhgaya 124.50 Sipara 365.02 Fatua LINE Khagaul 118.76 Fatua LINE PusaliNew LINE Sahupura 229.11
Bodhgaya Bodhgaya MTPS MTPS MTPS Purnea Purnea Biharshariff Biharshariff Biharshariff Patna Pusauli new Pusauli Arrah Hajipur Hajipur MTPS Gaya Gaya Gaya Gaya Patna Patna Sipara Sipara Arraha Pusali PRDC Bangalore
MW
-43.05 IS IS -2.14 35.61 28.45 26.48 26.48 -38.65 -38.65 40.19 40.19 35.52 35.52 -74.58 -74.58 -74.43 -74.43 -127.82 -127.82
% LOADING 16.2 0 0 7.2 13.4 13.4 29.5 29.5 18.1 18.1 25.1 25.1 9.6 9.6 34.5 34.5 13.3 13.3 9.9 9.9
IS IS -21.88 9.76 9.76 -2.23 -2.23 42.31 42.31 42.31 47.63 -10.98 13.52 -15.80 4.80 4.80 IS -17.53 -17.53 19.89 19.89 101.95 IS 35.47 IS IS -48.84
0.00 0.00 38.40 62.70 62.70 29.50 29.50 71.30 71.30 71.30 77.80 57.10 35.40 72.10 41.60 41.60 0.00 40.90 40.90 59.90 59.90 91.00 0.00 59.50 0.00 0.00 98.60
MVAr
OWNER
Power link
PGCIL
BSPTCL Power link PGCIL BSPTCL BSPHCL PGCIL BSPHCL & PG PGCIL BSPTCL
BSPHCL & PG
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
109
1
Chandauti
Karamnasa
LINE
IS
0.00
BSPHCL & UPPCL
110 111 112 113 114 115 116 117 118 119 120 121 122 123
1 1 1 1 1 1 1 1 1 1 1 1 1 1
Bodhgaya Sonenagar Sonenagar Sonenagar Jehanabad Rafiganj Rafiganj Dehri KCL Dehri Dehri Dehri Dehri Biharshariff
Wajirganj Japla Aurangabad Aurangabad Arwal Sonenagar Rafiganj_R Banjari Banjari Sasaram Sonenagar Sonenagar Bikramganj Rajgir
12.71 42.22 25.12 25.12 16.22 LINE 3.40 13.63 -0.80 LINE LINE LINE 23.68 28.12
4.59 -11.51 9.01 9.01 -2.51 IS 0.64 7.07 -1.97 IS IS IS 0.73 -7.78
17.40 54.20 33.50 33.50 21.20 0.00 2.20 19.90 2.60 0.00 0.00 0.00 28.90 36.30
BSPTCL
124
1
Biharshariff
Barh
LINE
IS
0.00
BSPTCL & DVC
125 126 127 128 129 130 131 132 133
1 1 1 1 1 1 1 2 2
Biharshariff Biharshariff Biharshariff Biharshariff Biharshariff Hathidah Hathidah Lakhisarai Jamui
Hathidah Nalanda Ekangasarai Nawada Sheikhpura Sheikhpura Lakhisarai Jamui Jhajha_R
-5.59 27.93 41.63 42.69 LINE LINE -70.70 71.16 10.02
22.83 0.33 10.36 9.52 IS IS 0.18 13.80 0.26
31.10 34.80 53.40 54.50 0.00 0.00 89.50 44.20 6.50
BSPTCL
Sl. No
135
From Station Samastipur Samastipur Hajipur Hajipur Begusarai Begusarai Purnea_PG Purnea_PG Gaya_PG MTPS_Kanti MTPS_Kanti Biharsarif Arrah Fatua Fatua Biharsarif Arrah Purnia_PG Purnia_PG Biharsarif
PRDC Bangalore
To Station
MW
Begusarai LINE Begusarai LINE Amnour 55.81 Amnour LINE Purnea_PG LINE Purnea_PG LINE Purnea_BS 71.17 Purnea_BS 71.17 Sonenagar New 160.34 Samastipur LINE Samastipur LINE TTPS -89.06 Khagaul LINE Biharsarif -125.71 Biharsarif -125.71 Begusarai 24.41 Khagaul LINE Purnea_BS 71.17 Purnea_BS 71.17 Begusarai 24.41 132KV line
MVAr IS IS -6.38 IS IS IS 7.56 7.56 -8.89 IS IS -8.76 IS -22.32 -22.32 4.81 IS 7.56 7.56 4.81
% LOADING 0 0 26.80 0 0 33.3 33.3 38.2 0 0 18.9 0 61 61 13.6 0 33.3 33.3 13.6
OWNER
BSPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181
No. of ckts 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
136
FORWARD From Station
To Station
Lakhisarai Jamui Rajgir Jamalpur Tarapur Sultanganj Sultanganj Jamalpur Lakhisarai Lakhisarai Sabour Dumraon Dumraon Dumraon Arrah_PG Arrah_PG Purnea_BSEB Banmakhi Purnea_BSEB Trivenigaunj Saharsa Saharsa Khagaul Muzaffarpur Samastipur Samastipur Pandauli Hajipur Gopalganj Chhapra Siwan Mushark Ekma Motihari Bettiah Bettiah Bettiah Ramnagar Ramnagar Darbhanga Darbhanga Kahalgaon Kahalgaon Kahalgaon Belaganj Belaganj MTPS MTPS
Lakhisarai_R Sheikhpura Barhi Tarapur Sultanganj Sabour Sabour Lakhisarai Lakhisarai Jamui Kahalgaon Arrah Dumraon_R Buxar Arrah_BSEB Jagdishpur Banmakhi Saharsa Trivenigaunj Forbesganj Udakishanganj Madhepura Purnea SKMCH Begusarai Hajipur Madhubani Hajipur Mashrakh Chhapra Mushark Gopalganj Ekma Dhaka Motihari Gopalganj Gopalganj Bettiah Swadesi_G Darbhanga Samastipur Sabour Lalmatia Lalmatia Chandauli Hjehanabad Samastipur Samastipur
PRDC Bangalore
MW
MVAr
4.00 28.67 LINE 0.00 15.93 LINE LINE -30.56 -145.48 LINE LINE -60.30 3.00 28.46 63.49 19.53 69.76 63.57 22.63 18.03 LINE 38.09 LINE LINE LINE LINE 0.00 0.86 16.21 6.49 0.00 16.21 6.38 16.00 LINE -43.39 -43.39 -51.48 LINE -80.71 1.64 LINE 26.07 15.77 -8.48 LINE -4.76 -4.76
0.98 10.62 IS 0.00 4.84 IS IS -10.95 -28.57 IS IS 5.83 0.42 -1.45 8.91 0.89 -3.29 -4.89 -6.68 -5.83 IS -7.07 IS IS IS IS 0.00 0.57 -15.36 1.94 0.00 -15.36 -5.90 4.70 IS 4.86 4.86 -1.04 IS 9.90 -2.68 IS -7.19 -7.19 4.86 IS -6.44 -6.44
% LOADING 5.20 38.90 0.00 0.10 20.30 0.00 0.00 40.40 91.70 0.00 0.00 80.70 4.00 37.90 82.30 25.10 84.20 76.90 28.40 22.90 0.00 46.70 0.00 0.00 0.00 0.00 1.00 1.40 27.30 8.80 0.10 27.30 10.90 22.00 0.00 54.90 54.90 65.70 0.00 99.20 3.80 0.00 32.10 20.60 12.90 0.00 9.90 9.90
OWNER
PGCIL
BSPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229
No. of ckts 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 2 1 1 2 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
137
FORWARD From Station
To Station
Sitalpur Jainagar Pulparas Pulparas Supaul Supaul Mohania Dehri Bikranganj Forbesganj Forbesganj Barh Pusauli Katiya BarauniTPS BarauniTPS BarauniTPS Surjapur MTPS MTPS MTPS MTPS Kudra_R Mithapur Kudra new Pusauli Kudra Chandauli Chandauli Chandauli chandauli Bodhgaya chandauli Balmikinagar Purnea Purnea_PG Purnea_PG Purnea_PG Purnea_PG Masaurhi Masaurhi Pusauli Kahalgaon TPP Hathidah_R Hathidah_R Nalanda Raxaul Runisaudpur
Chhapra Pulparas Supaul Supaul Katiya Katiya Karmansa Kochas Dumraon Katiya Katiya Hathidah_R Sasaram Duhabi Khagaul Begusarai Begusarai Balmikinagar Muzaffarpur Muzaffarpur Vaisali SKMCH Karmansa Karbigahia Dehri Kudra Kochas Bodhgaya Bodhgaya Bodhgaya Bodhgaya Paharpur Tekari Ramnagar Katihar Kishanganj Purnea Purnea Purnea Jehanabad Sipara Mohania Kahalgaon Mokama_R Hathidah Rajgir Bettiah Sitamarhi
PRDC Bangalore
MW
MVAr
47.91 -37.74 -3.79 -3.79 8.94 8.94 LINE LINE LINE 83.93 83.93 -34.01 31.94 102.16 14.23 26.14 26.14 -21.77 57.42 57.42 52.33 80.34 24.17 27.64 -31.87 -5.02 12.90 LINE LINE LINE LINE 2.90 24.75 -21.80 26.25 -8.44 68.30 68.30 68.30 41.91 -57.83 70.61 45.59 7.00 -41.15 LINE -7.32 LINE
5.63 21.76 0.09 0.09 -1.31 -1.31 IS IS IS 3.82 3.82 -13.16 -12.15 14.62 -8.12 14.29 14.29 1.85 2.95 2.95 -4.52 17.83 -5.05 6.92 11.01 7.91 -6.42 IS IS IS IS -1.55 -1.91 2.08 9.28 -4.22 5.95 5.95 5.95 -3.84 -5.99 -9.10 8.81 1.92 -14.96 IS 2.17 IS
% LOADING 60.90 55.00 5.10 5.10 11.20 11.20 0.00 0.00 0.00 51.20 51.20 46.70 41.80 49.90 20.10 36.80 36.80 28.30 70.90 70.90 32.70 50.70 30.30 19.40 42.20 12.70 17.60 0.00 0.00 0.00 0.00 2.10 31.10 29.00 34.20 11.40 26.80 26.80 26.80 53.90 74.30 86.80 55.10 9.40 55.70 0.00 10.40 0.00
OWNER
PGCIL
BSPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256
No. of ckts 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
257
1
258
1
259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Sl. No
138
FORWARD From Station
To Station
Tekari Wazirganj Ekangasarai Biharshariff Gangwara Madhepura Madhepura Madhepura Mashrakh Dalsingsarai Jehanabad Begusarai Jandaha Hazipur Begusarai Sherghati Immamganj Purnea Railfactory Muzaffarpur Khagul Khagul Digha Khagul Mithapur Katra Sipara Jakkanpur (Patna) Jakkanpur (Patna) Khusrupur RLY Fatua Fatua Harnuth Baripahari Baripahari Sabour Rafiganj Karmnasa Fatua Naugachhia Sitamarahi Hazipur Hazipur Chapra Motihari Motipur
PRDC Bangalore
MW
MVAr
Goh Nawada Hulasganj Hulasganj Pandauli Supaul Supaul Sonbhadra Siwan Siwan Tehta Dalsingsarai Samastipur Jandaha Kuswesthan Bodhgaya Bodhgaya naughat Sitalpur Dhalkera Bihta Fatua Khagul Khagaul Rail Gaighat Fatua Mithapur
11.99 LINE 19.85 LINE 0.00 54.74 54.74 20.20 LINE LINE LINE 25.97 LINE 22.54 13.07 -24.08 -13.37 30.83 -10.00 133.86 90.07 LINE -55.21 4.00 LINE -75.05 75.34
-4.40 IS 5.29 IS -1.34 -5.10 -5.10 2.95 IS IS IS -1.76 IS -6.68 1.85 -8.08 -4.62 -2.94 -2.87 32.07 23.77 IS -6.43 1.26 IS -10.10 12.09
% LOADING 16.10 0.00 26.30 0.00 1.60 67.00 67.00 25.50 0.00 0.00 0.00 32.10 0.00 29.40 17.20 32.10 17.70 37.30 13.20 33.10 59.60 0.00 35.60 5.40 0.00 95.90 96.00
Mithapur
LINE
IS
0.00
Sipara
-126.88
-20.07
82.00
Fatua Harnuth Sipara Baripahari Biharshariff Fatua BankaPG Chandauti (Gaya) Sahupura Gaighat BaruniTPS Dhaka Sheetalpur Hazipur New Ekma Tap Motipur MTPS
-6.00 LINE 39.00 -19.62 -84.55 LINE -67.00 -19.30 LINE 68.15 9.53 LINE 37.22 -95.41 LINE 63.53 -1.52
-1.92 IS -2.31 -5.78 -30.31 IS -27.07 1.53 IS 9.08 -7.05 IS -2.57 -18.99 IS 16.60 -2.26
7.90 0.00 48.70 25.80 56.10 0.00 43.90 24.70 0.00 85.70 14.50 0.00 46.70 60.80 0.00 81.10 3.40
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
276 277 278
No. of ckts 1 1 1
279
1
280 281 282 283 284 285 286 287
1 1 1 1 1 1 1 1
Vaishali Banka Kishanganj Chandauti (Gaya) Sultanganj Ekma Traction Banka PG Kochas Pusali Karbigahiya Naugachhia Sonebarsha
288
1
Jehanabad
289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Rihand Dehri Dehri Kishanganj New Kishanganj New Sonenagar New Dalsingarai Dalsingarai Arrah Madhubani Benpatti Tap Kishanganj New Darbhanga Bharti Gen SKMCH Sherghati Imamgaunj Hari Sugar Mill Tetha Tetha HasnpSM SUGAULI LAURIYA Sasaram1 Madhubani Aurangabad Arrah BS Belsand Dhaka Sitamari Gaighat Jandha Samstipur
Sl. No
139
From Station
To Station
PRDC Bangalore
MW
MVAr
Sheetalpur Banka PG Dalkhola
31.90 -31.85 LINE
4.91 -12.15 IS
% LOADING 20.60 20.70 0.00
Sipara
14.00
-6.34
9.60
Kahalgaon Siwan Sultanganj Dumaraon Kudra Rail Jakkanpur(Patna) Begusarai Udakishanganj Jehanabad Traction Sonenagar Karamnasa Karamnasa Kishangaunj Kishangaunj Sonenagar Kusheswar Kusheswar Arrah Rail Phulparas Jainagar Forbesganj Gangawara Gopalgaunj Belsand Bodhgaya Bodhgaya Ramnagar Chandauti (Gaya) Chandauti (Gaya) Dalsingarai Mothihari Ramnagar Banjari Benpatti Tap Shree Cement Arrah RLY Runisaidpur Sheohar Sheohar Katra Mahanar Samasti Trac
LINE -6.38 32.81 LINE 28.05 -31.28 LINE 9.36
IS 5.90 0.33 IS -4.14 2.32 IS 0.88
0.00 12.40 20.00 0.00 34.70 40.10 0.00 11.90
3.83
0.19
5.00
-13.78 LINE LINE 92.82 92.82 79.05 LINE LINE 7.41 LINE -24.69 73.55 44.36 LINE 14.21 -24.08 -13.37 -0.60 -6.36 -6.36 LINE -0.07 -0.07 LINE -18.06 18.01 5.00 7.64 LINE 9.05 LINE 6.16 3.80
5.72 IS IS -0.88 -0.88 -2.07 IS IS 2.12 IS 17.88 -10.94 -1.20 IS -1.25 -8.08 -4.62 -0.19 -0.97 -0.97 IS -0.02 -0.02 IS 17.52 2.75 1.47 -2.88 IS 1.95 IS -1.59 0.10
24.50 0.00 0.00 21.60 21.60 97.80 0.00 0.00 10.00 0.00 37.70 44.30 54.10 0.00 17.80 32.10 17.70 0.80 8.10 8.10 0.00 0.60 0.6* 0.00 31.70 22.80 6.70 10.20 0.00 12.40 0.00 8.20 4.60
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
322 323 324 325 326
No. of ckts 1 1 1 1 1
Kishanganj New Benipatti Tap Darbhanga Phulparas Madhubani
1 2
1 1
Ranchi New Ranchi New
3 4 5
1 1 1
Aadhunik Aadhunik Maithon
6
1
Jamshedpur
7
1
Jamshedpur
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Jamshedpur Chaibasa Chaibasa TISCO Parulia (PGCIL) MPL MPL Ranchi Ranchi Ranchi Ranchi Ranchi Ranchi Ranchi Ranchi Raghunathpur Raghunathpur Gaya Gaya Maithon Mejia B Mejia B Maithon Maithon Maithon Maithon Maithon Maithon Raghunathpur Gaya Gaya
Sl. No
140
From Station
PRDC Bangalore
To Station
MW
Kishngaunj 102.13 Benipati 6.47 Pandaul 23.00 Pandaul 0.00 Darbhanga 9.55 Jharkhand line loading 765 kV Dharamjaygarh -140.80 Dharamjaygarh -140.80 400 kV Jamshedpur 242.76 Jamshedpur 242.76 Jamshedpur -21.68 Durgapur -326.62 (DSTPS) Durgapur -326.62 (DSTPS) Mejia B -154.46 Jamshedpur -240.66 Jamshedpur -240.66 Jamshedpur -343.13 Jamshedpur 78.65 Ranchi 152.26 Ranchi 152.26 RanchiP 180.54 RanchiP 180.54 RanchiP 180.54 RanchiP 180.54 Maithon -126.48 Chandwa 523.98 Sipat -196.11 Sipat -196.11 Ranchi 262.24 Ranchi 262.24 Maithon -220.02 Maithon -220.02 Mejia B -14.79 Maithon 348.40 Maithon 348.40 Kahalgaon 152.38 Kahalgaon -29.82 MPL -103.45 MPL -103.45 Parulia (PGCIL) 148.71 Parulia (PGCIL) 148.71 Maithon 356.36 Koderma -116.57 Koderma -116.57
-3.09 0.59 -5.59 -2.28 -2.71
% LOADING 60.90 8.00 28.90 2.80 12.10
-164.89 -164.89
5.6 5.6
-1.98 -1.98 -61.67
13.6 13.6 7.4
-31.93
36.7
-31.93
36.7
-52.53 -44.52 -44.52 -16.01 -61.90 6.90 6.90 29.86 29.86 29.86 29.86 -62.77 81.65 -75.32 -75.32 -23.08 -23.08 -74.43 -74.43 2.60 34.86 34.86 -43.11 -10.50 -11.47 -11.47 7.42 7.42 6.24 -127.82 -127.82
18.3 27.6 27.6 38.6 11.2 17 17 11.3 11.3 11.3 11.3 15.9 15.7 23.7 23.7 29.9 29.9 13.30 13.30 2.10 39.70 39.70 17.90 5.70 11.60 11.60 17.40 17.40 39.60 9.90 9.90
MVAr
OWNER
PGCIL
APNRL
PGCIL
DVC
PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
39 40 41 42 43 44 45 46 47
No. of ckts 1 1 1 1 2 1 1 1 1
48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 2
Kalyaneshwari Kalyaneshwari Kalyaneshwari CTPS-new CTPS-new CTPS-old CTPS-old CTPS-New Kalyaneshwari Kalyaneshwari BTPS-B BTPS-B Giridhi Giridhi Maithon Ramgarh CTPS-old CTPS-old Kalyaneshwari Kalyaneshwari BSL
69
1
CTPS-New
Dhanbad
70 71 72 73 74 75 76 77 78 79 80 81 82 83
1 1 1 1 1 1 1 1 1 1 2 1 2 2
Ramchandapur Ramchandapur PTPS-TPS PTPS-TPS PTPS-TPS KTPP KTPP RanchiTG Maithon Maithon RanchiTG Chandil Chaibasa Maithon
Jamshedpur Jamshedpur Hatia Hatia TTPS Giridhi Giridhi Chandil Dumka Dumka Hatia Ramchandapur Chaibasa Dhanbad
Sl. No
141
From Station Koderma Koderma Koderma Koderma Chandwa Chaibasa Chaibasa Ranchi PG Ranchi PG
PRDC Bangalore
To Station
-52.48 -52.48 -37.41 -37.41 -58.74 -28.78 -28.78 -62.82 -62.82
% LOADING 12.70 12.70 19.90 19.90 15.20 3.50 3.50 16.10 16.10
9.07 9.07 9.07 -28.37 -28.37 -14.00 -14.00 -7.20 -55.27 -55.27 -1.97 -1.97 -7.48 -7.48 26.27 -30.82 -43.71 -43.71 -55.27 -55.27 -66.88
45.9 45.9 45.9 24.5 24.5 13.4 13.4 17.4 29.9 29.9 22.7 22.7 37.4 37.4 45.5 39.6 72.7 72.7 29.9 29.9 35.1
35.82
-7.20
17.4
-133.88 -133.88 6.26 6.26 -33.78 -5.99 -5.99 30.52 24.10 24.10 212.83 -74.27 8.80 191.73
-11.01 -11.01 0.19 0.19 -15.24 1.46 1.46 -11.06 -20.37 -20.37 50.95 -16.87 2.83 26.27
62.3 62.3 4.1 4.1 7.8 7.8 7.8 15.2 6.6 6.6 51.1 35.6 2.2 45.5
MW
Biharshariff 219.36 Biharshariff 219.36 Bokaro (BTPS) -172.62 Bokaro (BTPS) -172.62 Gaya 523.07 Bisra -12.78 Bisra -12.78 PPSP 128.84 PPSP 128.84 220kV Mejia-D -95.89 Mejia-D -95.89 Mejia-D -95.89 BTPS-B 42.83 BTPS-B 42.83 Kalyaneshwari -24.21 Kalyaneshwari -24.21 Dhanbad 35.82 Maithon -30.68 Maithon -30.68 Jamshedpur 44.61 Jamshedpur 44.61 Dhanbad -77.92 Dhanbad -77.92 Dhanbad 191.73 BTPS-B -161.88 CTPS-New -147.50 CTPS-New -147.50 Maithon -30.68 Maithon -30.68 CTPS-New -130.00
MVAr
OWNER
DVC
JUSNL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
Sl. No
No. of ckts
From Station
To Station
84
2
PTPS-TPS
85
1
86
MW
MVAr
% LOADING
Bodhgaya
LINE
IS
0
PTPS-TPS
Bodhgaya
LINE
IS
0
1
Chandil
STPS
-40.45
14.74
23
87 88 89 90
2 1 1 1
Dhanbad CTPS-New CTPS-New Ramghar
Elctro SteelD BTPS-B2 BTPS-B2 Gola
32.37 42.83 42.83 0.00
13.12 -28.37 -28.37 -6.81
10.4 24.5 24.5 1.6
91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127
2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ManiqueD ManiqueD CTPS-B CTPS-B CTPS-B CTPS-B BTPS-B-D BTPS-B-D CTPS-A CTPS-A Jamshedpur Jamshedpur CTPS-A CTPS-A Ramgarh Ramgarh PatratuD PatratuD PatratuD PatratuD PatratuD MaithonD Klyaneshwari MaithonD KumardubiD MaithonD MaithonD PatherdhiD PatherdhiD PatherdhiD PatherdhiD Putki Putki Nimiaghat Nimiaghat BarhiD BarhiD
132kV GolaD -36.94 Jamshedpur -27.90 Putki 41.09 Putki 41.09 Putki 41.09 Putki 41.09 ECR-GomD 0.15 ECR-GomD 0.15 PuruliaD 20.03 PuruliaD 20.03 MosabaniD 35.41 MosabaniD 35.41 GolaD 32.75 GolaD 32.75 GolaD -8.49 GolaD -8.49 North karnpuraD 9.92 Ramgarh -22.94 Ramgarh -22.94 North karnpuraD 9.92 JSPL 19.73 KumardubiD 41.14 MaithonD 75.21 Panchet 9.48 Panchet -6.61 PatherdhiD 35.32 PatherdhiD 35.32 SindriD 5.09 SindriD 5.09 Putki 0.99 Putki 0.99 Nimiaghat 7.98 Nimiaghat 7.98 GiridhiD -11.15 GiridhiD -11.15 BTPS-B-D -28.65 Konar -23.53
-10.62 -0.73 16.21 16.21 16.21 16.21 -0.40 -0.40 -1.70 -1.70 1.82 1.82 -9.28 -9.28 10.09 10.09 -2.58 3.61 3.61 -2.58 -3.92 22.47 17.54 3.52 -5.81 10.17 10.17 0.49 0.49 -3.52 -3.52 -10.21 -10.21 -7.95 -7.95 -2.95 -2.56
24.6 18 48.6 48.6 48.6 48.6 0.5 0.5 22.1 22.1 39.9 39.9 37.4 37.4 15.5 15.5 12.8 25.9 25.9 12.8 22.2 58.4 84.8 12.9 11 45.8 45.8 6.6 6.6 4.1 4.1 16.5 16.5 17.3 17.3 36.4 29.9
142
PRDC Bangalore
OWNER BSPHCL & JSEB BSPHCL & JSEB WBSETCL & JSEB PGCIL DVC
DVC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175
No. of ckts 1 1 1 1 1 2 1 1 2 2 1 1 2 1 1 1 2 2 1 2 1 1 1 1 2 2 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
143
FORWARD From Station
To Station
BarhiD BarhiD BarhiD BarhiD Konar RamkanaliD CTPS-B CTPS-B MosabaniD KodermD1 SindriD SindriD DHANBAD1 CTPS-A CTPS-A CTPS-A CTPS-B Putki Ramgarh ECRlyDVC Klyaneshwari CTPS-A BSLGD PatherdhiD GolaD Klyaneshwari ManiqueD CTPS-A Garhwa Dhalbhumgarh Lohardaga Lohardaga Kamdara Hatia Old Hatia New Hatia Old Kamdara Kamdara Hatia Old Hatia Old Namkum PTPS PTPS Deoghar Deoghar Deoghar Deoghar Deoghar
KTPP Hazaribhag Hazaribhag KTPP BTPS-B-D Panchet RamkanaliD Jamuria KharagpurD KTPP Pradhankhanda Pradhankhanda GovndrD BSL-DVC BSL-DVC Rajbera_DVC BiadaDVC BalhrDVC ECR Barkakana North karnpuraD MaithonD CTPS-B CTPS-B BalhrDVC SER Muri MAL-Impex ferro Manique R Rajbera_DVC Japla DhalbhumgarhRL Gumla Gumla Gumla Sikadari Namkum Kamdara Bakaspur R Bano R Hatia New Hatia New Sikadari Kanke Hatia Old Sultanganj Jamtara Shankarpur R Dumka Dumka
PRDC Bangalore
MW
MVAr
-21.47 23.96 23.96 -21.47 -40.38 9.08 LINE 0.01 5.12 -93.82 1.75 1.75 50.90 LINE LINE 9.50 30.14 -0.91 LINE -9.84 75.21 -20.68 LINE 0.91 4.21 36.02 2.09 9.50 -24.74 6.00 5.33 5.33 7.06 -27.59 40.61 41.71 3.00 LINE -47.04 -47.04 -67.40 40.57 30.45 0.00 LINE 3.00 -16.53 -16.53
-10.70 8.11 8.11 -10.70 -2.68 0.79 IS -5.71 -10.64 -36.17 0.30 0.30 1.33 IS IS 4.09 8.90 2.22 IS -2.77 17.54 28.90 IS -3.33 -0.70 3.89 0.44 4.09 12.80 1.75 0.94 0.94 -4.51 4.58 21.11 0.12 0.27 IS -11.50 -11.50 -8.62 9.58 5.44 0.00 IS 0.08 5.78 5.78
% LOADING 30.5 32.9 32.9 30.5 50.6 5.8 0 6.3 6.8 64.1 2.7 2.7 31.3 0 0 11.5 17.5 2.7 0 5.7 84.8 17.3 0 3.9 2.6 45 2.8 11.5 36 4.1 8.6 8.6 10.6 35.1 56.6 51.6 4 0 59.9 59.9 85.9 33 24.9 6.4 0 3.7 22.6 22.6
OWNER
JUSNL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223
No. of ckts 1 1 1 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2
144
FORWARD From Station
To Station
Dumka Dumka Dumka Dumka Kendposi Kendposi Manique Adityapur Adityapur Golmuri Golmuri Rajkharsawan Goelkera Rajkharsawan Goelkera Ramchandapur Nowamundi Sikadari Sikadari Chandil Adityapur Adityapur Dhalbhumgarh Dhalbhumgarh Kanke Lathehar Lathehar Lathehar Lathehar Garhwa Lalmtiya Hatia New Hatia New Namkum Namkum Namkum Hatia Old Hatia Old Adityapur Golmuri Golmuri Rajkharsawan Rajkharsawan Hazaribhag Rd Hazaribhag Rd Tamar Hatia Old Jamtara
Lalmtiya Lalmtiya Pakur Dumka Chaibasa Kendposi Chandil Ushamartin Ushamartin Jharsuguda Saljhagiri R Chandil Rajkharsawan CKPR Manoharpur APL Kendposi PH1 PH2 Adityapur Ramchandapur Ramchandapur MosabaniD MosabaniD Hatia Old Lohardaga Lohardaga Daltanganj Daltanganj Tolrah R Sahebganj Lohardaga Lohardaga Tatisiloi R Tatisiloi R UMIRa LodhmaR LodhmaR Rajkharsawan Chandil Chandil Chakradharpur Chakradharpur Konar Konar Chandil HEC Madhupur
PRDC Bangalore
MW
MVAr
-14.49 -14.49 23.56 24.51 -26.13 6.00 LINE 9.30 9.30 21.14 LINE -46.63 -19.02 9.37 4.01 16.24 LINE -44.82 LINE 29.22 -55.28 -55.28 -21.64 -21.64 7.19 -22.50 -22.50 21.70 21.70 16.02 10.59 44.37 44.37 10.82 10.82 2.90 2.63 2.63 31.19 -27.61 -27.61 8.02 8.02 -2.65 -2.65 -13.01 9.42 16.51
3.16 3.16 -4.09 -13.64 -0.99 1.55 IS 2.89 2.89 -1.26 IS -8.14 -10.19 0.90 5.39 12.79 IS -8.21 IS -10.74 4.34 4.34 -4.06 -4.06 -0.88 -2.64 -2.64 2.38 2.38 1.90 1.38 3.86 3.86 4.40 4.40 1.78 -0.48 -0.48 1.81 -1.75 -1.75 -2.49 -2.49 -0.81 -0.81 -0.57 3.40 -0.97
% LOADING 19.7 19.7 28.5 16.7 32.2 3.9 0 11.8 11.8 25.6 0 37.1 26.8 6 8.8 24.9 0 56 0 37.4 66.6 66.6 28.6 28.6 5.8 18.6 18.6 18.3 18.3 20.1 13.4 35.7 35.7 15.2 15.2 4.5 3.3 3.3 37.5 33.4 33.4 10.2 10.2 3.5 3.5 15.9 12.6 10.7
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD From Station
To Station
224 225 226 227 228 229 230 231 232 233 234
No. of ckts 1 1 1 1 1 1 1 1 1 1 2
Chaibasa Manique ABCILG Jamtara Rajkharsawan Hatia Old Deoghar Goelkera MaithonD Kendposi PatratuD
235
1
Garhwa
236 237 238
1 1 1
Inland P Inland P Sindri DVC
1 2 3 4 5 6
1 1 1 1 1 1
Jharsuguda Jharsuguda Jharsuguda Jharsuguda ANGUL PG ANGUL PG
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 2 1 1
Jaypore Jaypore Jaypore Indravati PG Indravati OHPC Rengali Bolangir Angul Angul Angul Angul TSTPS Angul Angul Sterlite Sterlite JSPL JSPL GMR Duburi TSTPS Meramundali
Sl. No
145
PRDC Bangalore
MW
MVAr
Rajkharsawan ManiqueD Garhwa Jamtara R RKSNR HEC Jamtara GoelkeraT Jamtara Nowamundi PTPS
-32.34 -51.24 23.93 8.00 8.30 9.42 LINE 12.00 50.53 LINE LINE
-2.14 -13.21 14.80 1.14 2.90 3.40 IS 3.77 -1.58 IS IS
% LOADING 39.6 67.8 35 10.3 10.8 12.6 0 15.7 63 0 0
Rihand
-9.66
-7.00
14.8
2.31 2.31 0.07
38 38 8.4
-51.24 -51.24 -65.78 -65.78 -251.50 -251.50
4 4 5.1 5.1 6.5 6.5
-26.47 -25.74 -25.74 -32.83 12.35 -41.26 -33.00 -85.08 -85.08 -74.73 -74.73 -14.38 6.60 6.60 -50.19 -50.19 -32.51 -32.51 -30.60 -51.61 -48.76 -0.65
8.3 34.3 34.3 31.1 29.9 7.6 21.2 27.5 27.5 41 41 38.7 18.7 18.7 8.6 8.6 4.5 4.5 38 23.6 31.8 33.3
Sikidiri 30.89 Sikidiri 30.89 ECRLY DVC 6.49 Odisha line loading 765 kV Dharamjaygarh -169.29 Dharamjaygarh -169.29 Angul 140.27 Angul 140.27 Srikakulam 17.11 Srikakulam 17.11 400 kV Bolangir -39.93 Gazuwaka 296.79 Gazuwaka 296.79 Jaypore 268.21 Indravati PG 259.35 Indravati PG 8.93 Angul -173.12 JITPL -226.78 JITPL -226.78 Meramundali 353.01 Meramundali 353.01 Angul -338.76 GMR -329.09 GMR -329.09 Meramundali -6.17 Meramundali -6.17 Meramundali 22.88 Meramundali 22.88 Meramundali 333.35 Meramundali -412.95 Meramundali -274.23 Mendhasal 289.62
OWNER
DVC & JSEB JSEB JSEB & DVC JSEB & UPPCL JSEB DVC
PGCIL
PGCIL OPTCL PGCIL Jindal PGCIL GMR PGCIL OPTCL OPTCL OPTCL OPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
Sl. No
No. of ckts
From Station
To Station
29
2
Pandibl D/C
30 31 32 33 34
1 1 1 1 1
35
OWNER
MW
MVAr
% LOADING
Mendhasal
99.28
-39.69
6.1
DUBURI4 Duburi Pandibl4 Baripada Baripada
Pandibl4 Baripada Baripada Jamshedpur TISCO
72.21 7.31 -27.20 -253.60 -193.94
-18.95 -62.44 -37.68 -49.35 -47.93
8.5 7.2 8.5 29.3 22.7
1
Baripada
Kharagpur
156.68
-28.02
18.1
36 37 38 39 40 41 42 43 44 45 46
1 1 1 1 1 1 1 1 1 1 1
Baripada Rengali TSTPS TSTPS Bisra Bisra Bisra Chaibasa Bisra Bisra Bisra
Keonjhar Keonjhar Rengali Rengali TSTPS TSTPS Jamshedpur Bisra Ranchi Ranchi Raigarh
-28.11 28.15 -6.35 -6.35 112.22 112.22 LINE -12.78 -57.79 -57.79 -117.13
12.92 20.83 -44.83 -44.83 -26.24 -26.24 IS -28.78 -45.61 -45.61 18.68
7 4 5.2 5.2 13 13 0 3.5 8.3 8.3 21
47
1
Bisra
Sterlite
45.78
9.49
6
PGCIL& Sterlite
48 49 50 51 52
1 1 1 1 1
Jharsuguda Jharsuguda Ind-Bharath Jharsuguda Ind-Bharath
Bisra Bisra Jharsuguda Raigarh Raigarh
101.84 101.84 LINE -145.72 0.00
-32.95 -32.95 IS -145.59 0.00
12 12 0 11.6 0
PGCIL
53
1
Sterlite
Raigarh
57.13
-79.89
11.1
PGCIL& Sterlite
54 55 56 57 58 59 60 61 62 63
1 1 1 1 1 1 1 1 1 1
Balimela Budhipadar Budhipadar UPPER KOLAB Theruvali Theruvali BHANJANAGAR BHANJANAGAR NAYAGARH Rengali PH
-1.12 33.04 33.04 112.47 41.87 103.47 34.27 72.29 -4.63 58.73
-49.44 17.56 17.56 -6.26 -23.48 4.77 1.55 11.65 0.83 -8.59
22.5 17.9 17.9 52.4 22.5 48.4 18.5 34.9 5.4 27.4
64
1
Rengali PH
43.48
21.75
22.6
65
1
BARKOT
16.63
0.00
8
66 67 68 69
1 1 1 1
TTPS BHADRAK Budhipadar BISRA
22.57 88.07 64.29 -67.67
-15.60 -3.54 9.72 -13.35
12.7 41.7 27 28.6
146
Rengali Switching Station TSTPS NEW DUBURI ITPS TARKERA PRDC Bangalore
220KV line Upper Silleru Bhusan Bhusan JAYA NAGAR BHANJANAGAR Narendrapur MENDHASAL NAYAGARH MENDHASAL TSTPS Rengali Switching Station
OPTCL & PGCIL PGCIL OPTCL PGCIL PGCIL PGCIL OPTCL & WBSETCL OPTCL OPTCL
PGCIL
OPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
Sl. No
No. of ckts
From Station
70
1
JAYA NAGAR
71
1
JAYA NAGAR
72
1
73 74 75 76 77
1 1 1 1 1
78
1
79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1
Rengali Switching Station MERAMAUNDLI Budhipadar Balimela JAYA NAGAR JAYA NAGAR Rengali Switching Station TARKERA UPPER KOLAB JAYA NAGAR DUBURI BIDANASI MENDHASAL TTPS TTPS MERAMAUNDLI MERAMAUNDLI Indravati ITPS Budhipadar Budhipadar TSIL DUBURI ITPS Budhipadar BALASORE Indravati KATAPALI MENDHASAL BALASORE NEW DUBURI PARADEEP UPPER KOLAB Theruvali Theruvali
107
1
Rengali PH
108 109
1 1
110
1
111
1
ITPS TARKERA Rengali Switching Station MERAMAUNDLI
147
PRDC Bangalore
To Station
MW
MVAr
% LOADING
143.85
27.50
68.2
143.85
27.50
68.2
Rengali PG
24.93
21.05
15.3
TSTPS RAIGARH JAYA NAGAR Balimela Balimela
-23.11 87.39 103.53 -103.18 -103.18
21.29 5.43 8.45 -14.21 -14.21
16.5 40.7 47.3 47.8 47.8
Chandiposh
6.42
-1.06
7
Chandiposh JAYA NAGAR Theruvali NINL MERAMAUNDLI CHANDAKA MERAMAUNDLI MERAMAUNDLI BHANJANAGAR BHANJANAGAR Theruvali Budhipadar TARKERA SPS JODA NEW DUBURI Budhipadar SPS KUCHEI Theruvali BOLANGIR CHANDAKA NEW DUBURI PARADEEP ESSAR JAYA NAGAR BHANJANAGAR Narendrapur Rengali Switching Station Budhipadar BISRA
-3.40 14.22 50.91 -2.83 -173.10 68.05 80.14 80.14 54.62 54.62 77.98 64.29 44.48 0.99 10.48 46.79 64.29 0.99 -102.33 77.98 45.93 68.05 -30.97 196.72 4.00 112.47 41.87 103.47
-17.71 -5.71 -3.24 -3.75 -18.93 6.83 23.47 23.47 -9.11 -9.11 -21.53 9.72 -7.09 -2.03 0.35 4.41 9.72 -2.03 -12.29 -21.53 -11.79 6.83 -11.14 25.29 -0.31 -6.26 -23.48 4.77
8.4 7.1 23.7 2.2 35.9 32.4 38.8 38.8 25.5 25.5 37.9 27 20.9 1 5 22.3 27 1 48.7 37.9 22.1 32.4 15.7 41.6 1.1 52.4 22.5 48.4
43.48
21.75
22.6
64.29 -67.67
9.72 -13.35
27 28.6
Rengali PG
24.93
21.05
15.3
TSTPS
-23.11
21.29
16.5
Jaya nagar PGCIL (Jaypore) Jaya nagar PGCIL (Jaypore)
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
143
1
144 145 146 147 148 149 150 151 152
1 1 1 1 1 1 1 1 1
153
1
154 155 156 157
1 1 1 1
Sl. No
148
FORWARD From Station
To Station
Budhipadar Budhipadar Indravati Indravati MERAMAUNDLI MERAMAUNDLI Budhipadar DUBURI BALASORE KATAPALI MENDHASAL MENDHASAL NEW DUBURI NEW DUBURI NEW DUBURI NEW DUBURI Budhipadar Budhipadar DubriNew Mendha Bhadrak BALIMELA THERUVALI Lakshmipur THERUVALI Narendrapur Mendhasal TARKERA Rengali Hydro JSPL JODA BOLANGIRNEW NALCO BSSL JODA Paradeep Basundhora Lakshmipur Atri Pandibil Lakshmipur JAYA NAGAR Traction JODA JODA BUDHIPADAR BUDHIPADAR
PRDC Bangalore
MW
MVAr
Korba Korba Theruvali Theruvali DUBURI DUBURI TARKERA NEW DUBURI KUCHEI BOLANGIR CHANDAKA CHANDAKA JINDAL JINDAL VISA ROHIT VEDANTA VEDANTA Maithan2 BIDANASI Balasore Balimela Splt Lakshmipur JAYANAGAR JAYANAGAR Aatri Aatri BARKOTE TTPS Jamshedpur Ramchandrapur
-82.18 -82.18 77.98 77.98 74.95 74.95 44.48 46.79 -102.33 45.93 68.05 68.05 -29.49 -29.49 0.00 30.75 -81.66 -81.66 3.20 LINE -26.18 14.42 -51.51 -58.64 LINE LINE 68.91 -1.58 35.97 20.48 -64.86
-29.86 -29.86 -21.53 -21.53 8.38 8.38 -7.09 4.41 -12.29 -11.79 6.83 6.83 16.08 16.08 -6.76 1.36 14.97 14.97 -2.48 IS 0.87 2.33 -16.02 1.47 IS IS -9.26 -17.04 -14.11 8.24 -11.21
% LOADING 40.6 40.6 37.9 37.9 36 36 20.9 22.3 48.7 22.1 32.4 32.4 16 16 3.2 14.6 34.4 34.4 1.9 0 13.4 6.7 12.6 14.2 0 0 16.4 8 17.9 15.4 31
Bolagir
175.17
18.95
82.5
Meramundali Meramundali JSPL IOCL BUDHIPADAR Utkal Aluminium Pandibil Samangara Aditya Aluminium
113.93 15.66 64.56 0.50 -2.00 LINE LINE LINE LINE
52.60 30.66 21.45 -0.34 -0.57 IS IS IS IS
29.1 8.1 32.3 0.3 2.3 0 0 0 0
Jayanagar
-36.72
6.47
17.4
TTPS2 TTPS2 Lapanga Lapanga
-42.59 -42.59 110.50 110.50
-19.12 -19.12 -6.27 -6.27
22 22 51.5 51.5
OWNER
JSL VISA Rohit VEDANTA
OPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
158 159 160 161 162 163 164 165 166
No. of ckts 1 1 1 1 1 1 1 1 1
167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1
194
1
195 196 197 198
1 1 1 1
Balimela Theruvali Jayanagar Theruvali Vedanta RyagdSp Digha BHANJANAGAR BHANJANAGAR Aska Aska Chatrapur Chatrapur Chatrapur MENDHASAL1 Chandaka ChandSpl Phulnakhara Chandaka TTPS TTPS Angul Chainpal MERAMAUNDLI Kamakhyanagar Dhenkanal ICCL Grid Steel (GSAL) Choudwar BPPL Cuttack Duburi
199
1
B.C. Mohanty
200 201 202
1 1 1
Duburi Chandikhole Kendapra
Sl. No
149
From Station
To Station
VEDANT VEDANT Lapanga Lapanga TARKERA TARKERA DubriNew DubriNew KATAPALI
Veda_135 Veda_135 KATAPALI KATAPALI RSP_220 RSP_220 Tata Steel Tata Steel BOLANGIR-New 132KV lines Upper Silleru Rayagada Damanjodi IMFA Kesinga Akhusinghi Berhampore Aska PHULBNI Berhampore Chatrapur Ganjam IRE Balugaon Chandaka Bhubaneswar Bhubaneswar Bhubaneswar Ranasinghpur Chainpal Angul NANDIRA FCI Dhenkanal OPCL Nuapatna Tap Maheswari
PRDC Bangalore
MW
MVAr
0.00 0.00 65.59 65.59 27.21 27.21 67.47 67.47 42.57
0.00 0.00 -9.41 -9.41 12.24 12.24 4.57 4.57 -12.35
% LOADING 0.4 0.4 30.9 30.9 14.2 14.2 32 32 20.7
-1.12 LINE 44.58 44.04 55.50 40.90 -16.41 19.78 20.86 LINE LINE 17.79 3.03 45.35 LINE 115.51 -2.60 2.62 96.60 45.16 42.31 24.76 0.40 73.56 -38.76 LINE -9.03
-49.44 IS -30.08 14.63 -0.51 -5.13 2.99 -1.09 -7.13 IS IS -4.02 0.62 -1.79 IS 20.11 -9.24 7.84 6.74 5.01 8.83 2.40 -0.18 8.05 -4.24 IS 22.94
22.5 0 64.3 56 67.1 51.5 21.8 23.6 26.3 0 0 23.3 4 58.1 0 71.8 11.7 11.4 118.6 53.6 51 29.6 0.5 88.5 47.1 0 31.2
Choudwar
14.37
18.54
28.6
BIDANASI BIDANASI Jagatsinghpur Jambay Ferro TISCO (Bamanipal) Jajpur Road Kendapra Ptamundi
-7.19 4.61 0.00 -64.69
4.43 1.40 -1.78 -4.20
10.5 6.8 2.2 79.6
9.93
-0.11
12.2
27.39 -34.45 31.06
6.00 -4.30 2.06
34.4 45.6 40.4
OWNER
OPTCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
150
FORWARD From Station
To Station
Nuapatna Tap Paradip Jajpur Road Bhadrak Balasore Balasore Balasore Balasore Bhadrak Joda Polasapanga Budhipadar Burla Hindalco Budhipadar Jharsuguda Rajgangpur Tarkera Tarkera Tarkera Rourkela Burla Burla Bolangir Old Saintala Kesinga Kesinga Budhipadar Tarkera Jaleswar Chhend Chhend Tarkera Nalda Traction Nalda Traction Kesinga Jajpur Road Jajpur Town Kuchinda Rajgangpur Joda Chatrapur Berhampore Berhampore Puri Sunabeda Jayanagar Burla
ARATI STEEL PPL Jajpur Town Soro Soro Basta BIRLA TYRE Balasore Alloys FACOR Polasapanga Karenjia Kuchei Samblpur Burla Brajaraj Nagar L0TCemco Tarkera Rourkela Rourkela RSP Bhalulata Tap Chiplima Chiplima Saintala Kesinga Khariar PowerMax MCL Chhend Jaleswar traction Adhunik NugaonTraction Chhend BEEKAY Barbil Bhawanipatna Kendapra Bhadrak SMC Rourkela Kendposi Narendra Pur Narendra Pur Narendra Pur Nimpara Damanjodi Tentulik Katapali
PRDC Bangalore
MW
MVAr
-37.62 LINE LINE LINE 39.98 43.80 3.66 44.90 -1.60 42.62 -7.01 -69.31 51.43 4.42 47.68 0.89 -11.20 22.33 22.33 LINE LINE 6.02 6.02 60.56 52.97 51.49 0.69 17.03 34.33 9.53 8.19 0.07 34.33 13.29 -15.69 25.60 LINE -48.14 -23.80 LINE 7.97 -52.70 -30.74 -30.74 LINE LINE 39.76 44.52
-13.58 IS IS IS 14.30 -3.16 0.09 3.09 -15.42 -7.26 -4.97 -29.25 0.24 -4.45 20.90 -0.54 -2.01 0.87 0.87 IS IS -0.84 -0.84 -7.76 -9.30 -1.36 -0.47 0.74 12.93 0.95 1.12 2.45 12.93 2.87 -10.34 -9.15 IS -11.47 -3.60 IS 0.63 0.82 -3.12 -3.12 IS IS 7.81 7.01
% LOADING 48.8 0 0 0 53 54.8 4.6 56.2 9.5 53 10.7 92.6 61.8 7.5 62.9 1.3 13.9 27.3 27.3 0 0 7.3 7.3 74.3 66.2 64.2 1 10.5 44.8 12.2 10.4 5.2 44.8 17.5 23.9 33.9 0 61.9 29.1 0 10.5 67.4 39.4 39.4 0 0 48.5 27.2
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
251 252
No. of ckts 1 1
253
2
Rajgangpur
254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285
1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Paradip Boinda Mohana Akhusinghi Bolangir Old Bolangir New Patnagarh Khurdah Balugaon T Tarkera NUAPATNA OPCL Chainpal Machkhnd Joda Chatrapur Digha Budhipadar Boinda Kurdsplt Balugaon Jajpur Road HMSwitch Sunabeda Rayagada Paradip Duburi Duburi Bhadrak Balasore Balasore Bhalulata Tap
286
1
Jharsuguda
287
1
Vedanta
288
1
Choudwar
289 290 291 292
1 1 1 1
Dhenkanal ICCL MERAMAUNDLI MERAMAUNDLI
293
1
HMSwitch
Sl. No
151
From Station
To Station
Theruvali Rajgangpur
JK Paper OCL Rajgangpur Traction IFFCO Rairakhole Akhusinghi Parlakemundi Sonepur Patnagarh Padamapur Balugaon T Narendra Pur Rajgangpur Nuapatna Tap TTPS Angul Vizag FAP-Joda Rambha Traction Mohana Sundargarh Angul Kaipadar traction Solari Rly Chandikhole HindMtl HAL VVC PPT Jakhpur Traction MESCO Bhdrak Traction Balsore Traction Somanthpur Bhulta Traction Jharsuguda Traction Theruvali Kendrapara Road(Traction) Joranda traction Mania ML Rungta BRG Meramaundali Traction
PRDC Bangalore
MW
MVAr
0.02 -9.55
0.06 -9.71
% LOADING 0.7 16.7
2.68
2.22
2.2
LINE 4.23 -21.17 8.31 30.60 31.93 7.36 LINE LINE 10.99 -37.04 -39.36 36.24 LINE 15.94 2.33 -16.49 16.15 -22.68 11.89 4.41 LINE 0.00 3.42 LINE LINE 16.04 LINE 5.73 2.50 LINE 5.48
IS 0.28 7.14 1.24 -10.04 4.97 -0.97 IS IS 0.64 -13.95 -7.27 8.38 IS 1.09 0.89 -0.85 3.46 -5.46 2.32 0.50 IS -0.02 0.53 IS IS 7.32 IS 0.11 -0.11 IS 1.58
0 7.7 29.6 12.2 39.2 39.2 9.2 0 0 13.6 49.2 47.5 43.9 0 19.6 4.1 21.1 20.4 28.1 15.1 6 0 0 4.2 0 0 22 0 7.1 3.1 0 7.3
10.40
3.18
13.2
-53.31
21.58
70.9
7.30
1.46
9.1
4.72 38.39 0.01 12.50
2.52 4.93 -0.09 5.46
7.2 47 0.4 16.4
7.40
1.77
9.8
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
Sl. No
No. of ckts
From Station
294
1
Narendra Pur
295
1
Jayanagar
296 297 298 299 300 301 302 303 304
1 1 1 1 1 1 1 1 1
305
1
306
1
307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
JayaSplt Machkhnd MackndRd MERAMAUNDLI MERAMAUNDLI Dhenkanal RAWMET MackndRd Manbar traction Jayanagar Traction Jayanagar Traction Chiplima Barpali Rajgangpur Rairakhole Samblpur Kendapra Rairakhole Tap Budhipadar Bolangir New Phulnakhara Arya Karenjia Jayanagar DhmraPrt Budhipadar OCL Jajpur Road Basta Samblpur BHANJANAGAR Chatrapur TTPS Angul Chainpal Tarkera Tarkera Chatrapur Paradip NBVL NBVL Budhipadar
152
PRDC Bangalore
To Station
MW
MVAr
% LOADING
4.32
7.06
10.5
Jagannathpur traction Jayanagar Traction Machkhnd MackndRd Padwa traction Chainpal Chainpal Maheswari Choudwar Manbar Traction Maliguda traction
17.86
-13.01
26.4
-46.17 LINE 5.01 LINE LINE 9.03 12.83 -5.01 -10.01
0.17 IS 0.63 IS IS -22.59 -4.01 -0.63 -0.40
55.2 0 6.3 0 0 30.2 16.3 6.2 12
Maliguda traction
15.06
0.61
18.1
0.00
-1.04
1.2
15.47 -32.29 -18.86 -7.58 -1.41 -64.24 -9.03 140.01 76.46 -16.88 -33.20 -14.39 -19.74 -2.94 LINE 30.23 16.62 30.29 -23.41 19.78 3.03 45.16 24.76 0.40 LINE LINE -52.70 LINE 25.47 25.47 16.15
5.06 0.18 -0.78 1.25 -6.04 -9.70 -1.59 44.53 -0.52 -4.45 -15.66 1.96 -4.98 -0.68 IS 2.81 -5.31 0.53 -3.56 -1.09 0.62 5.01 2.40 -0.18 IS IS 0.82 IS 4.58 4.58 3.46
10.2 40 23.4 10.7 7.5 41.9 11.4 73.7 92.8 21.2 45.9 18.9 24.3 4.7 0 37.3 10.8 38.2 28.5 23.6 4 53.6 29.6 0.5 0 0 67.4 0 33.2 33.2 20.4
Ch Kusumi Traction Katapali Bolangir New Budhipadar Rairakhole Tap Rairakhole Tap Paradip Katapali Budhipadar Bolangir Old Cuttack Bolani Rairangpur Meenakshi Bhadrak MSP Salipur Anandpr Jaleswar ShyamDRI Aska IRE Chainpal NANDIRA FCI RSP RSP Narendra Pur IFFCO HMSwitch HMSwitch Sundargarh
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD From Station
To Station
338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355
No. of ckts 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MERAMAUNDLI Paradip Duburi MESCO Bolangir New Duburi Paradip Hindalco Jharsuguda Tarkera SMC Lapanga Jayambee Ferro BEEKAY Steel Chandaka Joda Barbil Saliban
356
1
Jagatsingpur
357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
382
1
383
1
Paradip Aska Chatrapur Balugaon Chandpur Balugaon Tap Arati Steel Nimapara Nimapara Nimapara Khariar Argul Tap Sonepur JUNAGRH Shamuka Puri Dabugaon Dabugaon Joda Jayanagar Polasponga KATAPALI Bargarh Bargarh Budhipadar Burla-Rajganpur Tap Aryan Steel
HMSwitch PPT BRPL BRPL Bolangir Old Jajpur Road PPL Burla L&TCemco Rourkela Lapanga Budhipadar TTPS Bhulta Tap Nimpara Bansapani Arya HMSwitch GOREKNATH TRACTION Jagatsingpur Purusattampur Purusattampur Chandpur Balugaon Tap Atri RAWMET Konark Kesura Samangara Nuapara Shamuka Boudh Bhawanipatna Puri Samangara Tentulikhunti Umerkote Bolani Sunabeda Keonjhar Traction Bargarh Barpalli ACC Kahalgaon
Sl. No
153
PRDC Bangalore
Kuchinda ShyamDRI
MW
MVAr
LINE LINE 10.92 -3.56 76.46 27.39 LINE 4.42 0.89 22.33 -21.30 38.38 -67.64 5.49 50.32 2.26 -23.18 -1.49
IS IS 3.07 -1.16 -0.52 6.00 IS -4.45 -0.54 0.87 -1.77 17.18 -5.44 0.96 -6.03 0.77 -13.17 -0.48
% LOADING 0 0 14 4.6 92.8 34.4 0 7.5 1.3 27.3 25.7 25.7 82.6 7.3 62.1 3 33.8 2
7.81 41.19 12.28 LINE 9.46 0.00 LINE 24.06 5.81 LINE LINE 11.75 LINE 4.92 -18.48 -9.54 -45.63 -22.91 16.39 35.96 27.39 4.20 55.39 LINE 0.97 15.44
1.88 6.10 -5.63 IS -6.34 -0.22 IS -9.22 0.67 IS IS 1.07 IS -1.01 4.45 6.99 10.98 -5.24 4.07 15.63 5.55 1.81 15.28 IS 1.09 -1.87
10.9 53.2 16.2 0 14.9 0.3 0 31.3 7.5 0 0 16.1 0 6.3 24.4 15.1 57.6 29.4 21.9 48.1 34 6.2 69.3 0 2 18.8
LINE 22.91
IS -6.78
0 28.7
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
401
1
402
1
403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1
Sl. No
154
FORWARD From Station
To Station
Baripada Kendrapra Arati Steel BC Mohanty Budhipadar Khurdah Split Argul Tap Rayagarh Split Action Ishpat Rathi Adhunik Kesura Grid Steel Mania BPPL Kurda split Aryan Steel Burla-Rajganpur Tap Burla-Rajganpur Tap Kalugaon Somnathpur Bhadrak Marshghai Duburi BC Mohanty HMSwitch Arya Argul Atri Rajganpur Duburi Polasponga HMSwitch Lapanga Lapanga Lapanga Kalarangi Kalarangi Kuchai Khurda Chandka Rayagda Kesinga Splt Joda Kalarangi Tap Bhubaneswar
Balasore Marshghai Meramundali Duburi Jharsuguda Argul Tap Argul Jayangr splt Jharsiguda CHIPLMA Sri ganesh Ranasinghpur ICCL OCL TAP Chandaka Split Mendhasal Lapanga
PRDC Bangalore
Rajganpur Bamra Traction Tarkera EMAMI Dhamra Traction PARADEEP MSL Tomka Traction Samal Metalics BRP-St Atri Baki Kuchinda Kamakhyanagar MSP SGEL Jharsiguda Burla Burla Duburi Kmakhyanagar Bangaripusi Kurda splt Chandka Splt Rayagda Sp Kesinga Rourkela Kalarangi CTC
MW
MVAr
LINE -22.84 -43.03 -19.85 19.10 LINE LINE -47.36 2.63 0.00 -11.10 -22.05 -14.37 38.08 65.29 -17.33 -25.10
IS -3.16 8.14 0.20 -1.23 IS IS 2.72 6.38 0.00 -4.19 -1.59 -18.54 5.28 10.46 -2.39 9.32
% LOADING 0 29.8 53.9 24.4 23.1 0 0 59.6 4.3 0.3 14.6 27.9 28.5 47.1 80.2 21.6 32.3
LINE
IS
0
0.00 -15.86 -5.30 2.60 -26.87 3.23 0.00 0.00 3.47 -0.60 10.84 -5.01 -20.85 -3.26 16.58 LINE LINE LINE -28.05 LINE 21.39 -5.45 -67.41 -6.46 0.35 -28.10 28.05 20.83
0.00 -9.39 -2.04 -0.77 -4.30 0.38 -0.58 -0.05 0.70 0.39 -3.35 -0.25 -1.24 -7.69 2.73 IS IS IS -9.36 IS -7.08 -0.12 -19.12 -2.48 -8.68 7.93 9.36 9.01
0 22.6 6.9 3.4 34.9 4.1 0.7 0.1 4.6 1.8 13.7 7.1 25.6 10.4 21.6 0 0 0 36.8 0 27.4 6.7 85.8 8.6 10.8 37.1 37 27.9
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
430 431
No. of ckts 1 1
1 2 3
1 1 1
Teesta-5 Teesta-5 Malbase
4 5 6
1 1 1
New Melli New Melli Rangpo
7 8 9 10 11 12 13 14 15 16 17
1 1 1 1 1 1 1 1 1 1 1
Rangit Rangit Melli Rangit Rangpo Gantok Rangpo Gantok Rangpo Sagbari Sagbari
18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
1 1 1 1 2 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1
Mangan Geyzing Bulbuley Bulbuley Ranipool Rongli Mamring Rangit Ranipool Melli Pelling6 PNamchi6 Rothak Melli Melli6 Melli Gangtok Ranipool Tadong Tadong Rongli Geyzing Ranipool Mangan
Sl. No
155
From Station Bangaripusi Chandaka
PRDC Bangalore
To Station
MW
Rairangpur 21.21 Bidansi -37.94 Sikkim line loading 400 kV Rangpo 262.39 Rangpo 262.39 TALA LINE 220kV Jorthang -16.83 Rangpo 31.46 Jorthang -23.11 132kV Ramam 63.52 Sagbari -14.68 NJPPG 47.74 Kurseong 39.83 Chuzechan -45.94 Chuzechan -25.55 Melli 88.19 Rangpo -11.63 Rangit 34.91 Melli -17.51 Geyzing 2.83 66kV Phudong -2.86 Namchi -0.39 Sichey 5.05 Gangtok -10.04 LLHP 0.00 Pakyong -3.22 Melli -6.78 Rabangla 2.15 Pakyong 8.27 Namchi 1.46 Geyzing -2.14 Rothak 2.14 Soreng 1.07 Kalingpong 6.78 Melli 22.27 PNamchi6 5.04 Tadong 12.97 Gangtok -13.99 Sichey 3.54 Phudong 4.32 Rhenock 2.15 Geyzing 0.68 Topakhani 2.86 Meyong HEP 0.00
OWNER
-5.64 -3.47
% LOADING 26.8 46.6
15.05 15.05 IS
30.1 30.1 0
PGCIL
-18.76 -22.17 0.74
11.9 9.1 11
PGCIL
-14.96 8.80 -14.46 -10.44 -4.45 -6.44 -18.24 -4.72 -17.35 8.43 0.38
77.5 20.3 59.3 48.9 35.5 20.4 69.5 15 46.4 24 3.6
-0.67 0.22 1.29 -2.66 -0.01 -0.75 -1.91 0.50 1.97 -0.48 -0.65 0.35 0.16 0.47 3.31 0.93 3.27 -3.37 1.13 0.68 0.52 0.51 0.63 -0.13
6.1 1.3 10.6 21.1 0 6.8 14 4.4 9.1 3.1 4.5 4.4 2.2 6.8 44.7 10.2 27 29 7.6 9 4.6 1.7 6 0.3
MVAr
PGCIL NHPC PGCIL PGCIL Gati infra Sikkim
PGCIL
Sikkim Gov
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
42
No. of ckts 1
1 2 3 4 5 6
1 1 1 1 1 1
Malbase Rangpo Rangpo TALA TALA TALA
7
1
Binaguri
8
1
Binaguri
9 10 11 12 13 14 15 16 17 18 19
1 1 1 1 1 1 1 1 1 1 1
Farraka Farraka Farraka Farraka Farraka Farraka Sagrdghi Sagrdghi Sagrdghi Sagrdghi Subhashgram
20
1
Behrampur
21
1
Behrampur
22 23 24 25 26 27 28 29 30 31
1 1 1 1 1 1 1 1 1 1
Behrampur Haldia Haldia Jeerat Jeerat Jeerat KTPS KTPS Arambag Arambag
32
1
Arambag
Bakreswar
33
1
PPSP
34 35 36 37 38 39 40
1 1 1 1 1 1 1
PPSP PPSP PPSP Parulia (PGCIL) Parulia (PGCIL) Khargpr4 Khargpr4
Sl. No
156
From Station Rongli
PRDC Bangalore
To Station
-0.06
% LOADING 0.1
IS -74.82 -74.82 -29.97 -29.97 -29.97
0 69.1 69.1 11.5 11.5 11.5
IS
0
IS
0
7.54 7.54 29.00 -10.47 8.96 -8.70 39.95 39.95 -25.66 -25.66 -56.06
18.4 18.4 11.7 19.5 38.8 31.6 28.6 28.6 8.8 8.8 43.1
2.01
27.4
2.01
27.4
6.18 55.37 55.37 -44.51 0.83 -3.79 -88.05 -88.05 -26.33 -40.42
42 33.3 33.3 21.3 42.6 31.8 9.8 9.8 13.4 26
-111.39
14.92
13.3
Arambag
126.60
-24.13
17.5
Arambag Bidhannagar Bidhannagar Bidhannagar Bidhannagar Chaibasa Chaibasa
126.60 2.02 2.02 134.65 134.65 -249.35 -249.35
-24.13 -24.06 -24.06 54.03 54.03 -40.36 -40.36
17.5 9.1 9.1 16.4 16.4 28.5 28.5
MW
RongliH 0.00 West Bengal line loading 400 kV Binaguri LINE Binaguri 598.57 Binaguri 598.57 Binaguri 95.24 Binaguri 95.24 Binaguri 95.24 Bongaigaon LINE (NER) Bongaigaon LINE (NER) MaldaPG 161.80 MaldaPG 161.80 Parulia (PGCIL) -79.75 Parulia (PGCIL) 158.72 Behrampur 347.22 Sagardighi 282.19 Behrampur 248.64 Behrampur 248.64 Parulia (PGCIL) 29.45 Parulia (PGCIL) 29.45 Sagardighi -374.49 Behramara 240.25 (Bangladesh) Behramara 240.25 (Bangladesh) Jeerat 361.83 Subhashgram 274.47 Subhashgram 274.47 Subhashgram 178.11 Bakreswar -362.26 KTPS 272.19 Kharagpur -147.38 Kharagpur -147.38 KTPS 114.17 Bidhannagar -224.44
MVAr
OWNER
PGCIL
WBSETCL WBSETCL
PGCIL
CESC PGCIL WBSETCL
WBSETCL
PGCIL PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD
Sl. No
No. of ckts
41
1
42
1
43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Durgapur (DSTPS) Durgapur (DSTPS) Binaguri Binaguri MaldaPG MaldaPG Farraka Farraka Farraka Farraka MejiaB4 MejiaB4 Raghunathpur Raghunathpur Binaguri Binaguri AlipurDP AlipurDP
59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
STPS SubhasgramPG Kasba Jeerat Arambag Arambag Arambag Arambag Bakreshwar Bakreshwar Bidhanagar Bidhanagar Howrah Howrah Jeerat Jeerat ParuliaW ParuliaW Bidhanagar Bidhanagar STPS BishnupurNew BishnupurNew Laxmikantapur Laxmikantapur Bakreshwar Bakreshwar
157
From Station
PRDC Bangalore
To Station
MW
MVAr
% LOADING
OWNER
Raghunathpur
135.35
-21.21
15.2
DVC
Raghunathpur
135.35
-21.21
15.2
DVC
Purnea PG 294.11 Purnea PG 294.11 Purnea PG 47.16 Purnea PG 47.16 Khalgaon-I 1.42 Khalgaon-I 1.42 Khalgaon-II 38.67 Khalgaon-II 38.67 Maithan-I 348.40 Maithan-I 348.40 Ranchi 262.24 Ranchi 262.24 Alipurduar PG -47.52 Alipurduar PG -47.52 Bongaigaon -80.39 Bongaigaon -80.39 220kV Asansol 61.16 CLC 80.19 SubhasgramW -29.71 Satgachia 0.00 Domjur 153.48 Domjur 153.48 Midnapur 41.17 Midnapur 41.17 Bidhanagar 23.20 Bidhanagar 23.20 DPL -106.73 DPL -106.73 KTPS -90.59 KTPS -90.59 Kasba 92.93 Kasba 92.93 ParuliaD 42.39 ParuliaD 42.92 DTPS-D LINE DTPS-D LINE Hura 162.93 Arambag 22.93 Arambag 22.93 SubhasgramW -179.89 SubhasgramW -179.89 Satgachia 123.93 Satgachia 123.93
-74.58 -74.58 35.52 35.52 2.27 2.27 -3.67 -3.67 34.86 34.86 -23.08 -23.08 -53.08 -53.08 -110.32 -110.32
34.5 34.5 9.6 9.6 6.4 6.4 7.2 7.2 39.7 39.7 29.9 29.9 4 4 7.6 7.6
PGCIL
15.04 21.77 -5.21 0.00 21.95 21.95 -2.92 -2.92 13.72 13.72 90.87 90.87 -17.36 -17.36 -11.44 -11.44 41.18 41.20 IS IS -15.03 -9.60 -9.60 -19.95 -19.95 0.81 0.81
30.9 40.5 14.6 5 74.1 74.1 19.9 19.9 14.3 14.3 67.4 67.4 44.7 44.7 45.2 45.2 27.9 28.1 0 0 77.3 11.9 11.9 88.9 88.9 58.8 58.8
WBSETCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 1 1 2 1 1 1 1 1 1 1
158
FORWARD From Station
To Station
SubhasgramPG SubhasgramPG Kasba Kharagpur Kharagpur SubhasgramPG NTAA TLD NJP NJP Gokarna Gokarna Sadaipur Gokarna Gokarna Foundry Park Foundry Park Howrah Howrah Krishnanagar Krishnanagar Asansol NTAA Bishnupr New New Haldia New Haldia Bishnupr New Sadaipur SubhasgramPG SubhasgramPG NTAA Jeerat Jeerat Arambag2 Dharampur Gokarna VidyasagarW New Haldia Parulia Kharagpur Kharagpur Khargpur STPS JK Nagar DalkholaPG DalkholaPG Binaguri Binaguri
SubhasgramW SubhasgramW SubhasgramW Midnapur Midnapur NTAA Jeerat NJP TLD TLD Sadaipur Sadaipur Bakreshwar Sagardighi Sagardighi Domjur Domjur Foundry Park Foundry Park Satgachia Satgachia Bidhanagar CLC STPS KTPS KTPS Hura Bakreshwar EMSS EMSS Jeerat Satgach2 Dharampur Rishra Rishra2 Kishnanagar Kharagpur IPCLG Parulia Egra Egra Vidysagar Park JK nagar Bidhanagar MaldaPG MaldaPG BirparaPG BirparaPG
PRDC Bangalore
MW
MVAr
242.63 242.63 -29.71 88.03 88.03 27.25 -122.62 131.24 -39.45 -39.45 -72.91 -72.91 -73.51 -73.51 -95.02 -66.25 -66.25 -53.06 -53.06 -13.91 -13.91 -7.67 49.89 -106.94 -52.09 -52.09 -63.84 -73.51 250.67 250.67 -122.62 0.00 81.33 156.78 9.32 213.29 -60.52 0.00 -94.95 103.72 103.72 61.08 36.47 -8.80 4.38 4.38 8.67 8.67
35.28 35.28 -5.21 17.45 17.45 27.75 -1.37 -6.05 -16.11 -16.11 7.31 7.31 14.18 14.18 -35.08 -7.97 -7.97 -6.52 -6.52 -7.97 -7.97 -9.34 -12.72 5.46 -6.68 -6.68 -3.44 14.18 11.45 11.45 -1.37 0.00 33.75 7.05 20.11 20.35 -11.44 -0.84 -4.46 22.31 22.31 1.00 2.21 5.00 -10.44 -10.44 -6.76 -6.76
% LOADING 105 105 14.6 43.2 43.2 19.9 59.6 60.3 19.8 19.8 35.5 35.5 35.6 35.6 48.1 32.7 32.7 26.3 26.3 7.8 7.8 5.8 25 52 25.5 25.5 31 35.6 49.4 49.4 59.6 5 22.1 75 7.3 50.9 29.6 0.2 44.8 50.3 50.3 29.6 18.2 5.8 5.3 5.3 5.1 5.1
OWNER
WBSETCL/IPC L PGCIL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 2 2 2 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1
176 177 178 179 180
1 1 1 1 1
Sl. No
159
FORWARD From Station Binaguri Binaguri NJP NJP BirparaPG BirparaPG BirparaPG DalkholaPG DalkholaPG DalkholaPG DalkholaPG Farakka SiliguriP SiliguriP DalkholaP BirpraP2 BirpraP2 ALIPURDU ALIPURDU JK Nagar JK Nagar BurnpurD BurnpurD Mejia ParuliaD Barjora DTPS-D DTPS-D Parulia-D Parulia-D Parulia-D DTPS-D IISCOD EMSS EMSS EMSS BBGS BBGS BBG BBG EMSS EMSS Howrah Howrah Howrah Lilooah Lilooah PRDC Bangalore
To Station
MW
SliguriPG 82.46 SligurPG 82.46 Binaguri 51.55 Binaguri 51.55 Malbase 6.00 Chukha -35.87 Chukha -35.87 Purnea 27.36 Purnea 27.36 DkholaW 62.40 DkholaW 62.40 Lalmatiya 28.78 Krishanganj 74.02 Krishanganj 74.02 Krishanganj -188.26 ALIPURDUAR -28.59 ALIPURDUAR -28.59 Salakati_NER 4.05 Salakati_NER 4.05 JK Nagar 36.32 JK Nagar -8.80 Mejia-D -96.20 Kalyaneshwari -15.91 Durgapur 133.95 Durgapur -6.97 Mejia -133.45 Mejia -52.47 Mejia -52.47 TamlaD 10.33 TamlaD 10.33 Tamla 10.33 Parulia-D -5.07 BurnpurD -111.20 NCGS LINE NCGS LINE EMSS LINE BBG 123.14 BBG 123.14 EMSS 122.33 EMSS 122.33 Kasba LINE EMSS LINE 132kV B. Garden 41.70 B. Garden 41.70 SRS LINE Belur 39.56 Belur 39.56
-9.31 -9.31 -6.92 -6.92 -5.75 9.63 9.63 -1.54 -1.54 1.27 1.27 -3.67 -18.32 -18.32 21.41 -4.85 -4.85 14.29 14.29 11.66 2.93 5.22 -9.76 -15.14 23.77 -13.59 -6.08 -6.08 2.16 2.16 2.16 -51.14 -4.38 IS IS IS 12.53 12.53 17.75 17.75 IS IS
% LOADING 38.5 38.5 24.1 24.1 3.9 18.1 18.1 12.9 12.9 29 29 13.6 35.4 35.4 44.3 13.6 13.6 12.2 12.2 18.5 4.8 45.9 8.8 31.8 6.8 31.6 25 25 5.1 5.1 5.1 12.2 26.3 0 0 0 49.3 49.3 47.7 47.7 0 0
3.32 3.32 IS -0.77 -0.77
89.1 89.1 0 85.2 85.2
MVAr
OWNER
IPCL
DVC
CESC
WBSETCL
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1
160
FORWARD From Station
To Station
Lilooah Titagarh Titagarh Kasba Kasba Howrah Rishra Rishra Alipurduar Midnapur Pingla CK Road Leobong Leobong Dharampur Dhulian Joka Lalgola Gokarna Gokarna HM Dankuni HM Khanyan Malda Satgachia NBU NJP Samsi Saintia TCF-1 TCF-1 TCF-2 NBU New Haldia New Haldia Haldia Rishra Raigunj Cooch Bihar Chalsa Chalsa Contai Gokarna CLC Kasba TMBLK CK Road
Belur Titagarh Titagarh EMSS EMSS B. Garden Rishra Rishra Birpara Balichauk Balichauk Midnapur NBU Ramam Kalyani Farakka Sonarpur Raghunathpur Rampurhat KuliGIS Dankuni Lilooah Rishra Satgachia Samsi DhatriT TCF-1 TCF-1 Raigunj Rampurhat TCF-2 TCF-3 TCF-3 NJP Haldia HPCL HPCL CTOLA Gangarampur Alipurduar Maynaguri NJP Egra Raghunathpur Kasba Joka RMBLK Bishnupur Old
PRDC Bangalore
MW
MVAr
39.56 39.15 39.15 28.68 28.68 41.70 32.06 32.06 -37.02 35.58 -22.15 -49.90 25.84 -38.30 4.91 -26.07 LINE 23.68 52.44 58.07 LINE -6.00 LINE -32.58 70.35 4.00 14.31 11.88 LINE 27.04 0.00 0.00 LINE 6.83 3.36 5.96 1.74 3.88 40.35 -19.50 3.05 -22.32 -48.51 44.63 -40.01 LINE -23.84 LINE
-0.77 1.31 1.31 -20.53 -20.53 3.32 -0.59 -0.59 15.81 4.88 -1.69 -2.42 -7.45 6.30 -0.46 4.45 IS 6.74 7.22 13.47 IS -1.97 IS 16.94 10.03 -0.83 0.26 8.91 IS -1.03 -0.81 -1.72 IS -13.89 -19.11 0.54 13.04 20.70 0.57 4.28 -1.06 5.58 -9.84 12.19 -18.97 IS -9.75 IS
% LOADING 85.2 85.5 85.5 22.7 22.7 89.1 21.4 21.4 49.4 45 28.2 64.1 32.3 46.8 6.3 32.7 0 31.9 66.4 74.7 0 8.1 0 47.3 86.6 5.2 17.3 18.5 0 35.1 1 2.1 0 18.7 24.4 7.5 16.7 13.7 49.3 24.2 3.9 29.3 63.9 58 55.3 0 32.5 0
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
161
FORWARD From Station
To Station
Basirhat Basirhat Arambag Arambag Arambag Arambag Ashoknagar Ashoknagar Bankura Bankura Barasat Barasat Birpara Birpara Birpara Birpara Bolpur Bolpur Bongaon Bongaon Dlkhola Dlkhola Debagram Debagram Debagram Dharampur Dharampur Domjour Domjour Bidhannagar Bidhannagar Bidhannagar Bidhannagar Falta Falta Gokarna Gokarna Joka Jeeerat Jeeerat Kasba Katwa Katwa KTPS KTPS KTPS KTPS KTPS
Ashoknagar Ashoknagar Raina Raina Tarakeshwar Tarakeshwar Jeeerat Jeeerat Bishnupur New Bishnupur New Jeeerat Jeeerat BRPPG BRPPG Maynaguri Mathabhanga Saintia Saintia Krishnanagar Krishnanagar Raigunj Raigunj Katwa Katwa DebagramTSS Titagarh Titagarh Uluberia Uluberia DPL DPL Mankar Mankar Laxmikantapur Laxmikantapur Katwa Katwa Sirkl Bongaon Bongaon SaltLak Satgachia Satgachia KolaghatW KolaghatW TMLK TMLK Uluberia
PRDC Bangalore
MW
MVAr
-44.30 -44.30 40.87 40.87 47.75 47.75 -80.72 -80.72 -2.07 -2.07 LINE LINE -69.91 -69.91 14.72 31.45 24.01 24.01 LINE LINE 48.97 48.97 LINE LINE 2.76 70.07 70.07 16.88 16.88 LINE LINE 49.93 49.93 -59.87 -59.87 0.00 0.00 -62.46 31.28 31.28 45.81 -29.38 -29.38 33.45 33.45 32.34 32.34 36.06
-2.73 -2.73 16.84 16.84 -4.13 -4.13 -7.86 -7.86 -5.83 -5.83 IS IS 0.97 0.97 6.20 9.29 -2.18 -2.18 IS IS -2.33 -2.33 IS IS 0.36 12.42 12.42 10.49 10.49 IS IS -4.74 -4.74 1.03 1.03 -2.69 -2.69 1.36 5.56 5.56 16.81 -9.02 -9.02 13.52 13.52 7.16 7.16 2.58
% LOADING 58.3 58.3 55.5 55.5 60.1 60.1 104.5 104.5 7.7 7.7 0 0 83.6 83.6 20.3 39.2 31 31 0 0 54.1 54.1 0 0 3.7 90.7 90.7 26 26 0 0 61.7 61.7 78.4 78.4 3.4 3.4 82.3 40.3 40.3 60.6 39 39 45.7 45.7 41.9 41.9 45.8
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1
162
FORWARD From Station
To Station
KTPS Lilooah Lilooah NJP NJP STPS STPS NJP PG Domjour Domjour Arambag Arambag Tarakeshwar Tarakeshwar Bishnupur New Bishnupur New Borjora Borjora RGP RGP Mankar Mankar Mahachanda Mahachanda TATA Power TATA Power Cresent Cresent Krishnanagar Krishnanagar Debagram Debagram Berhampur Berhampur Hizli Hizli Midnapur Jhargram Jhargram NTAAIII Ukhra Ukhra TCF-3 TCF-3 Rishra Rishra Bishnupur New Bishnupur New
Bagnan Rishra Howrah Siliguri Siliguri PuruliaW PuruliaW Kurseong Jangipara Jangipara Birsingha Birsingha Belmuri Belmuri Borjora Borjora Bidhannagar Bidhannagar Bankura Bankura Mahachanda Mahachanda Satgachia Satgachia Haldia Haldia Asansol Asansol Ranaghat Ranaghat Amtala Amtala Amtala Amtala Midnapur Midnapur Pingla Midnapur Midnapur Barasat Bidhannagar Bidhannagar Dlkhola Dlkhola Bighati Bighati Bishnupur Old Bishnupur Old
PRDC Bangalore
MW
MVAr
71.74 LINE -29.25 17.57 17.57 26.68 26.68 -31.08 10.04 10.04 27.46 27.46 25.98 25.98 10.07 10.07 LINE LINE 27.53 27.53 24.37 24.37 LINE LINE 43.43 43.43 18.40 18.40 51.13 51.13 LINE LINE 45.80 45.80 LINE LINE 32.43 -23.41 -23.41 127.79 -32.19 -32.19 LINE LINE 6.68 6.68 22.02 22.02
5.67 IS 1.05 2.99 2.99 2.55 2.55 10.42 -3.08 -3.08 6.40 6.40 -13.11 -13.11 -0.61 -0.61 IS IS 0.19 0.19 -9.42 -9.42 IS IS 22.43 22.43 8.02 8.02 -2.35 -2.35 IS IS -1.85 -1.85 IS IS 3.39 -4.91 -4.91 22.98 -0.51 -0.51 IS IS -10.19 -10.19 1.85 1.85
% LOADING 45.5 0 37.8 21.7 21.7 32.6 32.6 40 13.3 13.3 35.4 35.4 37 37 12.6 12.6 0 0 33.6 33.6 32.5 32.5 0 0 61 61 25.3 25.3 65.4 65.4 0 0 58.8 58.8 0 0 40.8 30 30 82.3 39.9 39.9 0 0 15.4 15.4 27.3 27.3
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD From Station
To Station
325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1
Bishnupur New Howrah Howrah Howrah Khejuria GIS Bishnupur Old Bishnupur Old Satgachia Satgachia Laxmikantapur Laxmikantapur Dharampur Dharampur Hura Hura Hura Bagnan Krgpr132 Saintia Malda Bengal Energy SonarLal Raghunathpur MaldaPG MaldaPG Berhampur Berhampur
352
1
Berhampur
353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Ranaghat Ranaghat NTAAIII Bidhannagar Bidhannagar Ujanoo NJP PG Ujanoo Adisaptagram Adisaptagram Lilooah NJP PG NJP Balurghat Balurghat Gokarna Debagram Debagram Haldia
Bishnupur Old Lilooah Lilooah Lilooah Malda Khatra Khatra Kalna Kalna Kakdwip Kakdwip Jeeerat Jeeerat PuruliaW PuruliaW RGP Uluberia Hizli KuliGIS Khejuria GIS Egra Lalgola Dhulian Malda Malda Gokarna Gokarna Cossim bazarTSS Dharampur Dharampur NTAA Bolpur Bolpur NBU NBU Siliguri BTPS BTPS Rishra NJP Maynaguri BalurghatTP Gangarampur SonarLal Krishnanagar Krishnanagar Hizil
Sl. No
163
PRDC Bangalore
MW
MVAr
22.02 50.52 50.52 50.52 -21.43 13.54 13.54 21.19 21.19 22.60 22.60 -9.17 -9.17 LINE LINE 78.50 22.34 LINE -23.86 21.59 -23.30 9.85 LINE 118.09 118.09 -97.79 -97.79
1.85 -2.15 -2.15 -2.15 4.06 -1.68 -1.68 1.72 1.72 -2.79 -2.79 -11.40 -11.40 IS IS -2.25 1.24 IS -4.23 -5.42 -0.28 3.62 IS 14.51 14.51 -9.43 -9.43
% LOADING 27.3 64.7 64.7 64.7 27.1 16.9 16.9 26.8 26.8 29.2 29.2 18.7 18.7 0 0 18.6 28.5 0 31.1 27.1 29.9 14 0 56.2 56.2 125.9 125.9
5.00
0.93
6.7
0.69 0.69 70.29 62.58 62.58 -27.79 34.63 6.97 -38.09 -38.09 LINE 58.97 46.45 -27.73 1.43 20.06 -20.06 -20.06 33.38
-27.69 -27.69 8.35 1.16 1.16 4.55 2.90 -3.80 -23.67 -23.67 IS -8.97 -13.40 -3.65 -4.06 3.22 -3.89 -3.89 8.62
36 36 89.7 77 77 34.2 41.7 9.6 56.3 56.3 0 71.6 58.2 34.8 5.4 26 26.5 26.5 43.3
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
FORWARD From Station
To Station
372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 2 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1
Haldia TMLK TMLK Falta Falta Ramam Sonarpur New Haldia Bajkul Bengal Energy Raigunj Lalgola Lalgola PuruliaW Belmuri Belmuri BalurghatTP Hizil Hizil CK Road Sirkl Maynaguri Amtala SaltLak Bankura Cooch Bihar Katwa Bankura Bishnupur Old Bishnupur Old Midnapur Barasat KolaghatW TMBLK Bolpur Rishra
408
1
HOWRH DVC
409
1
410 411 412 413 414 415
1 1 1 1 1 1
Foundry Park Tap Vidyasagar Park BRG Steel Tap BRG Steel Tap Vidyasagar Park Vidyasagar Park HIZLI TSS
416
1
Khejuria GIS
Sl. No
164
PRDC Bangalore
MW
MVAr
Hizil Hizil Hizil Joka Joka NBU Kasba Bajkul Egra Hizli BalurghatTP Gokarna Gokarna Bagmundi Adisaptagram Adisaptagram Malda Rohit Ferro Mankar CK Road-Tr Laxmikantapur Mathabhanga Najirpur CLC Bengal concast Birpara KatwaTss BankuraT Modern Rohit Ferro WBIDC BarsatT Madras cement WBIDC Bolpur Trac Jayshree Foundry Park Tap
33.38 -0.23 -0.23 24.71 24.71 36.10 -70.50 50.48 -10.02 7.87 2.15 -18.08 -18.08 4.42 13.79 13.79 -26.36 LINE 2.00 1.80 -96.12 LINE 30.18 -33.30 0.25 -39.15 0.30 7.50 9.10 LINE 23.70 4.00 4.00 8.84 2.00 10.43
8.62 -5.88 -5.88 -1.93 -1.93 -8.65 -6.33 10.62 -3.59 2.03 -2.27 -5.92 -5.92 -3.71 -14.65 -14.65 0.68 IS 1.90 1.50 2.69 IS -2.22 -8.19 1.88 5.80 0.06 3.17 0.19 IS 7.33 1.18 0.77 4.79 3.58 3.25
% LOADING 43.3 7.5 7.5 32.4 32.4 44.4 88.7 33 13.6 10.8 3.8 24.3 24.3 7.1 25.5 25.5 32.2 0 3.5 3.2 62.7 0 19.8 43.2 2.6 18.7 0.4* 10.1 11.3 0 31.4 5.5 5.2 12.8 5.3 13.8
7.58
-0.98
9.9
Kolaghat DVC
-2.05
-3.02
4.7
BRG Steel Tap BRG Steel Midnapur Hizli HIZLI TSS Hizli Farakka Switching
1.31 1.30 LINE 33.66 29.69 17.65
-4.07 0.09 IS 0.46 -0.04 -0.95
5.3 1.7 0 42 37.1 22.7
36.25
-2.44
22.2
OWNER
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No
No. of ckts
417
1
418
1
419
1
420
1
421
1
422
1
423
1
424
1
425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457
1 1 1 1 1 1 1 1 1 1 1 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1
165
FORWARD From Station
To Station
Farakka Switching Ambuja Cement Tap Ambuja Cement Tap Kharagpur DVC Foundry Park Tap New Haldia Resmi Metalic BLK NewTown Action area-I Bishnupur Old Chanditala Bajkul OCL Bishnupur Mankar BTPS BTPS BTPS BTPS BTPS BTPS BTPS KolaghatD KolaghatD DTPS-D DTPS-D DTPS-D DTPS-D KharagpurD KharagpurD KolaghatD KolaghatD HowrahD HowrahD BelmuriD BelmuriD Burdwan Burdwan Kalipahari Kalipahari PuruliaD Jamur1 DTPS-D
PRDC Bangalore
MW
MVAr
% LOADING
Ambuja Cement Tap
10.01
2.96
12.9
Raghunathganj
LINE
IS
0
Ambuja Cement
10.00
3.24
12.9
Kharagpur Traction
LINE
IS
0
Food Park
9.61
2.90
13
Bajkul
50.48
10.62
33
Vidyasagar
-38.88
-14.53
52
SALTLAKE GIS
50.20
5.57
32.3
OCL Bishnupur Domjour CONTAI Midnapur Emami Cement Kalyani Lilooah Khanyan Satgachia Bighati Bighati Dharampur KolaghatW KolaghatW ASP Kalipahari Kalipahari ASP KolaghatD KolaghatD KolaghatT HowrahD BelmuriD BelmuriD Burdwan Burdwan DTPS-D DTPS-D Klyaneshwari Klyaneshwari Jamshedpur DTPS-D RamkanaliD
LINE -36.25 27.79 -1.00 0.80 56.34 58.66 -0.44 -25.14 8.42 8.42 137.25 LINE LINE 18.16 23.50 23.50 18.16 2.51 2.51 4.29 -1.32 -6.62 -6.62 -15.94 -15.94 -54.69 -54.69 -5.63 -5.63 22.12 -71.25 13.21
IS 16.31 5.06 0.00 0.54 15.13 16.21 13.60 17.12 11.35 11.35 38.01 IS IS 7.86 2.49 2.49 7.86 -1.24 -1.24 1.91 0.36 2.96 2.96 1.08 1.08 -0.50 -0.50 -6.64 -6.64 -2.28 2.94 -1.25
0 25.8 36.2 5.3 1.2 72.9 38 18.1 39.9 18.9 18.9 59.3 0 0 21.7 25.8 25.8 21.7 3.5 3.5 5.8 3.6 9.6 9.6 18.6 18.6 62.1 62.1 10.9 10.9 14.3 79.6 16.4
OWNER
DVC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. No 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505
No. of ckts 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
166
FORWARD From Station
To Station
SonicTD KolaghatT KolaghatT DPL B. Garden B. Garden SRS SRS Majerhat Majerhat Majerhat Majerhat PRS Taratala Taratala Taratala Taratala Chakmir Chakmir Chakmir Chakmir EMSS Jadavpur BBD Bag BBD Bag Titagarh Gen Titagarh NCGS Chitpur Tr PRS East Calcutta Chitpur Tr East Calcutta EMSS Park Circus SRS B. Garden BT Road Park Circus EMSS NCGS NCGS BBD Bag Titagarh EMSS East Calcutta EMSS EMSS
Barjora HowrahD Badrinarayan AS DTPS-D SRS SRS Majerhat Majerhat Taratala Chakmir Chakmir Jadavpur PLN Chakmir Chakmir PRS BBD Bag BBGS BBGS BBGS BBGS PKL EMSS PRS PRS BT Road NCGS BT Road East Calcutta PRS EMSS BT Road PRS Kasba PRS SRS SRS Dumdum EMSS Patuli BT Road NCGS BBD Bag Titagarh EMSS EMSS Dumdum Dumdum
PRDC Bangalore
MW
MVAr
-51.71 -4.32 8.61 LINE LINE LINE LINE -21.02 -2.99 -116.84 -116.84 35.07 LINE LINE LINE 62.69 65.82 -105.85 -105.85 -105.85 -105.85 32.05 -70.10 3.81 3.81 -72.24 -38.02 81.22 60.61 LINE -102.68 -60.49 -70.12 -28.68 82.23 LINE LINE -49.95 -103.24 32.04 -38.10 LINE 26.83 LINE LINE -80.09 LINE LINE
-1.56 0.42 2.36 IS IS IS IS -5.00 9.84 -5.98 -5.98 4.31 IS IS IS 8.88 9.42 0.60 0.60 0.60 0.60 -4.07 -3.36 2.88 2.88 -19.55 -6.80 -3.44 -5.13 IS 1.41 -4.08 -29.52 20.11 1.98 IS IS -1.28 -11.36 2.42 2.60 IS 7.71 IS IS -0.97 IS IS
% LOADING 55.6 5.5 10.3 0 0 0 0 21.9 8.5 91.2 91.2 28.2 0 0 0 50.7 53.1 59.5 59.5 59.5 59.5 20.9 55.8 4.3 4.4 48.5 40 54.1 49.8 0 66.5 48.2 59.7 22.7 53.5 0 0 32.5 67.3 21.7 49.6 0 12.4 0 0 52 0 0
OWNER
DVC/DPL
CESC
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527
No. of ckts 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 2 2 2 2
528 529 530 531
1 1 1 1
Sl. No
167
FORWARD From Station BT Road PRS Majerhat PLN East Calcutta Jadavpur EMSS PRS EMSS Titagarh BT Road SRS PRS ECAL ECAL ECAL DPL DPL DPL DPL DPL DPLA JALI JALI JALI JALI
PRDC Bangalore
To Station
MW
BT Road LINE Majerhat -37.06 Majerhat -79.39 PKL -32.04 East Calcutta LINE Jadavpur LINE EMSS 87.02 PRS LINE PRS LINE Titagarh Gen -19.12 Titagarh LINE Majerhat LINE PRS LINE PRS -70.12 EMSS -80.09 DUMDUM 83.10 DPLB 100.39 DPLA 16.15 DPLC 41.44 DPLC 56.17 DPLAB 18.08 DPL-Bamunara 20.07 66 kV lines JALI 13.45 JALI 13.45 Chalsa 13.40 Chalsa 13.40
IS 10.28 24.15 -3.22 IS IS 46.89 IS IS -7.35 IS IS IS -29.52 -0.97 4.43 36.34 5.47 18.14 10.57 -5.26 3.95
% LOADING 0 41.4 36.8 9.5 0 0 2.5 0 0 9.3 0 0 0 59.7 52 68.4 67.7 21.8 28.8 36.3 11.9 13
-0.94 -0.94 -0.96 -0.96
26.9 26.9 26.8 26.8
MVAr
OWNER
DPL
WBSETCL
September 2017
Geographical Diagram of existing Eastern Region network (May-17) Dikchu
SIKKIM
Teesta 5
12
47 (3 km 9)
(-1)
1 95
, Quad
Moose
22 8
Mo os
ad
Mo os
e -2 0
e
-21
km
8 (99
2 (1 13)
)
Purnea 1.01 -1043 (-27)
2X660 MW -348 (85)
93,69 km, Qua
d Moose
-942 (-71)
(2 85) -1 29
6 63 ) 7 (3 658 (59 )
Barh 1.01 23 2
k m,
d Qua
s Mo o
4X210 MW+3X500 MW
Kahalgaon
(0)
(0)
)
(54
(-6 )
357 (63)
178 (-7) 374(56)
km ,T -549 w in (-111) M oo se (5 0)
2 (4 13 ) 6
-2 7
(-14)
0) -27 (7
7
m
192k
)
Tw in m130k oo m se
295k
m
(62
-12
27
72 (-5 )
(3
8)
8.5km -333 (31) 333(-28)
(-159)
Twin moose
13 (90)
1.01
Mendhasal 1.00
LEGEND
rsimiris
-34
(152)
(276)
454 -3 (1 (8) 40 70)
280
(503)
Meramundali
400 kV S/S
7
(-4 )
765 kV line
26
400 kV line
-594 (51 )
Thermal generation Hydro generation Pumped storage plant
Kolar 225
km,
Twin Moo se
Srikakulam
586 (106)
Gazuwakka
Display Notation Injection into the bus : +ve Drawl away from the bus : -ve Voltage Mag/(Ang) in pu /degree Flows in MW and (Mvar)
0.97
Eastern Regional Power Committee (Eastern Region existing network May-17) geographical map R0
APPROVED
REVIEWED
CHECKED
DRAWN
DESCRIPTION
REV
Existing
765 kV S/S
Quard Be
276km
324
40 km
935 (0)
84,97km
153km 21 (61)
oo se
m, Tw in M
5k
14
(92 )
117
in Moose 171 km, Tw -225 (52)
33 9 (1 -2503 4)
-455 (-10 8)
68km
68
km
-203
(66)
46
12 (100)
62.5km
(0)
M oo se
0
,T wi n
km
6
35
2 55 ) 2 (17
75 -2 ) m (-28
//
k .3
-40 (61)
m
80km
0k
m 78k (2 6) -114
52
28 km 8 -2 68 k m Twin Moose (3 3)
2 36 ) (-1
13
224 25115km -2 (40) ) (1 2
)
72
11km -268 ) (-57
40 4(
iris im ers dB
)
e os Mo se in o Tw Mo in Tw m,
m,
0k
6k
0)
km e os Mo in Tw
6 11
22
a Qu m,
)
(2 6
Bheramara (Bangladesh)
24
20
7 (9
-711
WEST BENGAL
24km
2k 27
2 (-1
25 0.99 (1 9 4k 4) m -2 59 Indravati 0.99
, Twin 222 km
Moo se
29
-357(-6)
3 (3 76 2) (66) -81 80 157(68) 150 km, (-2 Twin Moose -1 9) 58 (10 58 ) (14 171 km 3) -58 (51)
48 km
-29(41) 172km 153(48) Twin Mo ose 29 (10)
-153(43)
//
//
69km Quad Moose
1 -38 1) (-5
2 -11 ) (26
708(122)
44 km km, -3 39 ) 41 (-3 (13)1 -255
2) (13
Indravati (PGCIL)
Angul
1.00 1.01
m
m
0 -28
(6
5)
1 28 (20)
)
117 k
9 (2 39 -4
se
94.6km
oo M
517 se Moo (85) Quad
win ,T
-451
km
ORISSA
9
67 k
111km
81
-57 ) (80
Raigarh
Bongaigaon (NER)
217 km, Twin Moose
) (-136
-347 (-9)
(104) Quad Moose (45)
450
0
)
74) (8)
) (0
Dharmjayagarh
40
Tala
1.01 9) 8(9 Alipurduar_PG 25 ) 3 1.02 -9 161 (234) 7( 114 km, Quad Moose 114 km 25 (183) 83 -83 (-88)
9) (-6 se 5 -9 oo M
1.01 -160 (1
622 (8 3
Patna 941
JHARKHAND
0.99
1
km
in
Fathepur
Jeypore
) (5 582
(0)
0
e
17 -3
(0)
5 11 8,
-662(137) 1.02 710 1 ) 29 217 km, Quad Moose (-2 Moose Twin km, 145 km .5 82 89, 102 -328 Malda_PGCIL 12 (218 (36) -551 ) 547(-8) (21 1.02 -551 327(-138) (142) 6) Moo se 95 24 192 km, Twin Lakhisarai km (45) 485 -6 -47) 8 FARAKKA (39) 2( ,T ( 1.01 184 km -2 w 3 3 ) in 3X500 MW 86 , Twin 151 Mo Moo se -1 (-2 Biharshariff 3X200 MW Gaya os 63 ) -4 5 4 8 e (2 89 1.01 ) 0.99 / 1.00 (1 (3 67 3) ) Farakka 437(148) 1.02 -164 (73 272 km Banka 22 ) , Qua 0 2 1.01 d Moo (0 277km (25 126 se ) Nabinagar km 4) 2X300 MW 592 ) 0.00 456 4 -22 2X500 MW (11 Sagardighi 7) Bakreshwar 2 (-7 5 34(11 1.02 -49 ) 2X210 MW Maithon-RB 6(7 7 (1 2X525 MW 80) 513 1.03 Koderma 00 k 4) 0.99 Behrampur m 1.01 2 6 49 ,Q (126 km 7(1 Maithon -34 2X500 MW ) -208 ua 03) 1.02 7( (12) d 1.02 4 28 Mo 5 Chandawa -30 -480 (-4 31 ) 345 46 ) km o 3 ) 73 km ) se 66 -298( 1.00 (-13 (9 3 (34) 519 -1 364 e (46) (166) 5) 71km-I (24) os -127 ndian Mo 355 70 (4 Twin Moose Bokaro m (127) 2 km, in 85 portion k 3 2X500 .7 1.02 , Tw ) se 4) 53 36 2 o k (1.01 o m m 3 k MW in M 33 65) ) Gokarna 188 -520 (-79) 0(62 , Tw / / /-262(2 m k -13 270(36) km (25 ) 200 16 719(3 350 141(165) ,1 69 30 2 37) 3 1 55 DSTPS km 70.5 km (-172) -720 (63) (55) 1.03 (-118 12 6 141(165) ,T 129 -65 9 ) Raghunathpur 78.6 (-64) -79 w Parullia 5) km in 2X500 (62) 61 (5 4X225 MW km 1.03 Ranchi new 2 1 1.02 M 16 (151) PPSP e is m MW 2 s oo ir 39 () k 1.01 34 1.01 / 5 7) 3 1.02 7 Mo o rm Ranchi (64 7 se ) e 1 2 871 s (7 -5 (48) 653 8 -155 (76) iri win dB 1.02 T a m 7 7 er ) (37) Mejia(105) -11 Qu Bidhanagar 8 B , (3 -2 Adhunik 53 (48 ad km 1.01 se 5 ) u o 1.03 o Q // 2X270 MW Jamshedpur 4.6 185 km, Twin Moos win M m, 34 e (161) 1.02 km, T 1.02 1k 405 33 488 486 6) 155 168 km 30 1 (1 -21(2 210 k -178 Jeerat 5) m, Tw (53) (46) 0.3km (-4) 0.99 in Moo (44) 1 se 11 5 ) 252 70 Chaibasa -1 ( 2 m (1 76) k TISCO 343 1.02 482 46 Arambagh (16) (DVC) 30 90km 1.00 (89) 1.02 m (-1) 9 8 k -195 (9) 546 (180) Subashgram -502 (45) -30 16 km 0.99 oo se 20 2 1.5 131Mo os e (-57) win M T (3 , 91km 6) km Haldia 499 (81) -148 Twin 147 120 km (39) 151 km, Hexa Zebra 337 // Twin 1.01 ) 6 9 5 (88) (11) mo (-1 Bisra 19 (102) 6 (14 6) m1 0) ose 117 Twin moose 5 2) 0k (2 3) (-1 14 25 4(4 8) 10 54 ( 1 0 1.01 Kharagpur 4(4 -46 0 -1 57 9) se KTPS 1.01 Moo 2X300 MW km 8) in 5 (2 w T Keonjhar 28 1.00 13 se k m, o e 0 (0) s o Baripada 11 3X210 MW Moo (PGCIL) (-13) win M Jharsuguda win m, T (Kuchei) m, T 1.01 91 k k 6 ) 1.01 1.02 Rengali 15 1.01 (2 7 -28 Twin Moose 1.00 230.4 km, ) (54) 28 (19 -28 (-21) in Moose -9 147 km, Tw 100km ) Sterlite 6 9 (41) 2X600 MW TSTPS 6X500 MW 28 (-14 1.01 JITPL 1.00 2X350 MW 456 1.02 Duburi 3X600 MW (2 23 GMR 662 1.00 69 ) 1X600 MW 16 0 ) ) 1X350 MW 1.01 ( 0 (17 335 ) (0 JSPL -7 0.00 2 9 (2) 1.01 5 74 GMR-3rd unit 13(52) -72 -6 ) Ind-Bharath 4 (4 ( 19 8 1X350 MW 1.01 -46 9) (4 ) 5 6 9 ) (6 5 k m os e 5) (15 97 Mo Bolangir_PGCIL in km w T 6X135 MW 30 4 1.01 37.9 km -41 1) 173(33) (4 46 (-23) 2 19 8 km 3) , Twin Mo (1 90 9 ) 9k (-1 ose (-165) m 8 841 -174 65 28 Pandiabil (-12) // 25km (40 8 , ) (66 ) 18 74 99 (1 1.00 ) -843 25km
km Q ,Q ua ua km d dB , Tw Be er s in rs im 21 5 km, Mo iris Sasaram im Twin Mo o -1 se ris ose 27 1.00/ 1.00 -15 (61 ) (-64 ) 545 (58) 356 km, Quad Bersimiris 112 (-31) 0
76
Allahabad
Sipat
148 km TW IN M OO SE
8) (3
Qu
240 km, Quad Moose
(0)
0
k m,
km
34 7
(-53)
(0)
72
BIHAR
1.00 1031
e o os ad M
-0
7
-171 (-28) -171 (-35)
se
Muzaffarpur
31
km , Qu
se
w ) 40 m , T (1 k 7 16
3 41
ad
oo
e
0
0
9
11 (-1 84 94 72 km, Quad Moose ) -864 (168) ) 861 (-79) 0 49 7 (1 Binaguri -58 1.01 se o Mo in , Tw km 68
(85)
1.01 M
50k m
95
321 km
Saranath (Varnasi)
km , Qu
oo
Mo o s
Kishanganj
d
12 9(1 38 ) 1 Tw 32 k in m Mo os e
180
km ,Q ua dM
)
)
Balia
Qua d
(1 8
,Q ua
9 (4
349
k m,
km
42 -2
2 61
.3 4
se oo M
63
Gorakhpur
24 2
0 (0)
1.00 -1 19 9(1 52 )
in w ,T km
1
1.00
0 11
Darbhanga (DMTCL)
TALA 6X170 MW
Malbase Rangpo 0.00
0
TEESTA-3 6X200 MW
(-28) 524 -525 (39) 12km
-7
TEESTA-5 3X170 MW
5 28 (93 )
258 (-90)
1.00
Teesta 3
16.8 km 1.00 1 (1 5)
121km (0) 0 (0)
0.00
14, Golf Club Road, Tollygunge, Kolkata, West Bengal 700033
09/11/2017
DATE
REMARKS
LOA details: ERPC/PR_DBASE/2016/3567 Dated 30 March 2016
Power Research & Development Consultants Private Limited # 5, 11th cross, 2nd Stage, West of chord Road, Bangalore-560086.INDIA Tel :+91-80-4245 5555 E-mail:
[email protected] DRAWN USING : MiP-PSCT
TM
DWG. NO. : Geographical Power Map\May-2017\ER
N
Geographical Diagram of Existing Bihar Network (May-17)
SURAJPURA (HEP) (NEPAL) 7.2 km r the Pan
-22
DRAWN
DESCRIPTION
REV
DATE
REMARKS
75 ) (10
85
26km
-20 (-5)
(30)
ther Pan
2) km (-1 17 -76 -68(-9)
ble
Pa 2.5 km nth er
5k m
-35 (-9 )
-47 (-14) Ca
(11) 74 16km
30 km Panther
41 (-4)
90 km Panther
0
(0 )
(-2 8)
127 (20)
-121 (-38)
14 .5 km Pa nt he r
89
(2 3)
-16 (2)
(3)
(- 2 )
25km -67 (-21 )
0
-551 (36) 7) -624 (-4
(-1 1)
2 -3 BANKA NEW r 0.99 Panthe 32 km -32 12.5 (12 ) (-10)
BANKA-PG 1 1.00
(0)
(0)
0
( 10
-26 (-9 )
15 0(16 ) 861 (-7 9)
1 Km
102 (-3)
16 8k 98 m, km Tw ,Q in ua Mo dM os oo e se
-9 (-1)
Pa nt he r 70
km
7)
(9 )
582 (-7
633
3 x 500 M W
-1 6 (7)
MALDA
2)
95 km , Tw in
KAHALGAON (BSEB) 1.01
-30 (-15)
(48 )
29 (10 )
Pant her
172 km , Tw in M oos e
41 km
-68 (-25)
(1 )
622 (83)
-489 (33)
105 km Panther
) (4 (8)
OLD PURNEA-PG 1.01 1.00
-26 (-8)
70k mP anth er
30 (-1) 63.5 km Panther
67(27)
(-5)
-17
-0 (5)
-30 (-9)
35 km Panther
0 (0)
a br Ze
Mo os e
LEGEND FARAKKA NTPC
PARTICULARS
400kV S.S Lalmatiya JUSNL
220kV S.S 132kV S.S 765kV Line
Jhaja TSS
0.97 -10
SYMBOL
765kV S.S
15 3
25.3 km Panther
-32 (-10)
9
(5)
-64
-2 0
(-18)
-31 (-9)
-14
(-2)
13
(5)
-13 (-6)
(-31) 15 km
-147
-635 (76)
Pa nt he r km 59 .6
61 (-14) -2 (-5 5 )
-5
-2 (2)
(-0)
-23 (-2) 1 16 km (-18)
Pan ther
66 km
(0) 0
) (15
41
(0)
0 28 km
0 (0 )
(-9)
-28
-5 51
DALKHOLA
400kV Line
(-3)
er 149 km Panth
km 13
er nth Pa
2 (0)
-41 (1) (0)
0
(-3) -16
23 k m
(0)
0
0 25 km 0 (0) Panther (0) -0 (-0 )
(12 7)
43 2
km
(8)
1.7
9 -12
6 km
30 Pa km nt he r 13 (6)
71 (15)
(-12)
(3 )
(138)
129 53 km
) 174 (17 (4)
km 142
km
0
27
(0)
6 (-4) 12 27
0 (0)
(45 )
-20 (-5)
14.5 km
90 km Panther
(1) -6 (-0) 6 km Panthe r
8 (-5) 20 km 140(7)
17 km
-251
(-40)
er 138 km Panth
27km
Panther
-31
Sn ow bir d Tri ple
63 km Panther
12 6k m
0 (0) 0 (0)
-41 (-2)
-9
-176 (9) (0)
23 km
16 (2)
-21 4)
30 (km 41 (-4 )
-13 (-3)
-12 (-4)
-16 (-5)
18
(3)
(-13)
-32
6
-16 (-5) -24 (-1)
15km
(0)
0
-42 (11)
Panther
-46
-80 (-18)
1
km 30 .2
(7 )
Zebra
Pa nt he r
-32 (-5 )
-1 (-1) -57 (-18)
-3 (-1 4 0)
19 (2) 26
45 Km Panther
0 (0) 56 km
-1 3
16
-65
km
(-20)
-9
(-3)
45km Panther
-1
(-1)
(-21)
10 (3) 17 km
-10 (-2)
-40 (-13) -63 (-9) 2 km
(-1 )
.3 km Pa nt he r -20
r Panthe 35 km
55 km Panther
(0) 0 (2)
55 km Panther
(6) 27 km -13
-1 4
Pa nth er 38 km
-5 (-2)
0 (0)
-3
0 (0)
0 (0) 0 23 (0)
13(-5)
km
2
-32
21 km Panther
-0
(0) 10 km
-0 (-0) -66
e Moos , Quad 349 km
6 35 km (-6)
0
(1 0)
-8 9
16 (-1 3)
(0)
40km Panth er
52 km 0
-6
(-2)
) 286 (33
CHECKED
DALKHOLA-PG
220kV Line 132kV Line
TENUGAT TPS
Load 272 km Qua d Moo se
Quad Mo ose
CGP
CGP
TO DEOGHAR
Hydro Generation a Zebr km, 136
REVIEWED
26 k mP anth er
KATIHAR 0.99
47km Panther
JAMUI
km 41
98 4) (-32
(9)
BANKA
0 (0) 1.01
4 x 210 M W
1 72 7) (-5 1
82
0 (0)
r the Pan km 60
( -0 )
-9
KATIHAR
-66 2 (13 7) KAHALGAON-NTPC 1 1.02
SABOUR 0.97 (0)
19 km
14
SULTANGANJ 0.99 0 0 (0) 30/31 km 0 (0 Panther )
BHAGALPUR
MUNGER
1.01 1.01 (-1 )
2
6 (1 Pa 0) nth er
45
-16 (-4)
-16 (-4)
KISHANGANJ
55 2 km
NEW PURNEA-PG 9 5 (1 1 1.01 40 ) 29k m
(-6) -21
Dalkhola (PG)
KISHANGANJ
-21 (-5)
(0)
-13 (-6)
-14 1 (-15)
(0)
6km
TARAPUR 0.99
er
5 (1 8)
e os Mo
31 km, Zebra
-74 (1 1)
-72 (11)
in Tw
e os Mo
, Quad
184 km, Twin M oose
-1 0
Siliguri (PG)
a , Zebr
in Tw 7, 16
(-1)
PURNIA
er
0
20
(0)
Moose
48 km, Twin Moose
Twin Moose
0
m 3k 1.3
-4
-23 (7)
th Pan
-26 (7)
JAMALPUR 0.95
Pan th
P anth er
er nth Pa
Panther 45 km
, km 98
-190 (26)
(0)
PURNEA 1.00
-12 5 (5)
0
-59 (5)
88.6 km
km 39
100 km Zebra
232 km
3 -3
81 km
)
-1043 (-27)
UDAKISHANGANJ 0.97 -9
ther 46 km Pan
-1
(-7
) (-1 70 (-4)
0 14 (0 ) (-6) KHAGARIA 0.98
38km
) (3 10
(-2)
km
101.2 km Panther
0( 0)
9 (2)
33(4)
0
18
) (-7
93
) (11
9 -10
1) 31 (1
r he nt Pa
(0 )
71 (-2)
er nth Pa km 30
0.97
0
ARARIA
70
(6)
BANMAKHI -6 1.00
r he nt Pa
SAHARSA
547 (-8)
(- 1 1)
KISHANGANJ-PG 1.01
93 (-0)
217 km, Quad Moose
0 (0) LAKHISARAI-PG 1.01 0.99
- 29
-18
5
0. (0 35 k ) m
145 km, Twin Moose
Pa nth er
-3 FORBESHGANI 3 0.99 -42 (-2)
(-4 )
8 10
49 km
-84
22 ) (-5
-4
er nth Pa
2 X 110 M W
LAKHISARAI
108 km
) (-1
er nth Pa
28 (1 2)
km
r he nt Pa
BINAGURI-PG
km
ther Pan
km
KHAGARIA
-71 (-14)
KODERMA CHANDWA
Thermal Generation
MAINTHAN
Display Notation: Injection into the bus : +ve Drawl away from the bus : -ve Voltage Mag in PU Flows in MW and (MVAr)
BARAHI
Bihar state existing network (May-17) geographical map
APPROVED
BARIPAHARI 0.96
-65 (-20)
BIHARSHARIF BSEB
Eastern Regional Power Committee
17/09/2016
HARNAUT 0.96
-20 (-12)
NALANDA
-10 NAUGACHIA (7) 0.98
LAKHISARAI 8 ) 0.97 -3 - 12 ( -31 (-10)
-328 (142)
km 50.9
.9 31
km
NAWADA
117 km
Patratu
R0
(0)
0
BARH-NTPC
(-71) KHUSRUPURRLY 0.97
-6 (-2)
) (2
4
-0 (-1)
42 nthe km r
(211)
-2 5 2 (-4 5)
(17) ) (-3
km
(9)
JAPLA
941
-94 2
Moose 93 km Quad
Panther 6 7.2km (2) Pan th Pa 45 er 0 km
Quad Moose (285) 69 km
JAHANABAD
MADHEPURA
km 150
89 km Twin M oose
327 (-138) 102.5 km Twin M oose SHEIKHPURA 0.95 485 (39)
39 .7
MADHEPURA 1.00 0.99 124
31
(6)
-160
3 km Panther
Zebra
-3 (-2)
0.97 437 (148)
se d Moo , Qua
13(5)
91.5 km
159
0 (0 ) (0)
0
(-1)
(-6)
136km Panther
Jamui
ra Zeb
) (-19
RIHAND
km 55
Paharpur TSS
(85)
IMAMGANJ 0.96 -13 (-4)
SHERGHATI TAP
(2)
(0)
ra Zeb
se Moo uad km Q 347
7 51
) (-6 14
GAYA-PG 0.99 1.00 0.99
80 km
GAYA 3
SHEIKHPUR
Lakhisarai TSS 0.97 km 6 ) 4 (1
26 km 0 Panther (0)
0 (0)
Pa nth er
42 ) (10
25
0.96 Shreecement
-13 (-2)
(2 40 )
km 126 4) (25 222
ROHTAS
SHERGHATI 0.95 -24 (-6)
35 km
-4 2 )
10
-327
AURANGABAD 0.96
2)
(-8
NAWADA 0.94
(0)
-14 8 (36)
-54 (-4 ) -3 (
(-5)
a
is
WAJIRGANJ 0.97 -13 0 (-5) (0)
7 (-0 1 )
ra Zeb
(2 18 ) 41
23
Bersim
Chandauti 0.96 -16 (7) -1 -6 4 (-0) (-2 4) ) -13 (- 5
) 0 (0
12
-27 (-8 )
75km
-49 (-10) (0 )
er
37 50 km Panther
2 -11 -9 (-4) SONEBARSA (-1) 0.98
km 60
(27 )
ose Twin Mo
, Quad
Zebr
HULASGANJ 0.94 RAJGIR 0.95
0.92
-2 (-8 7 )
nth Pa
SAHARSA 1.00 -38 (7)
-25 (-10)
, 182 km
SONENAGAR 0.98 NEW 0.98
95 km
) -1 9 (3 (0) 0 BODHGAYA 0.98 0.97 (-6) -24
Nalanda
km 33
111 km, Quad Moose
341 km
km
r Panthe
86 -2 ) 4 (-2
(2) -79
km 19 41 (-2)
28. 9
-2 (-4 0 )
16/14 km
(-2)
25 (-1)
TEKARI 0.96
-3 (-1 )
0 (0) RAFIGANGJ 0.96
BELAGANJ 0.96 -8 (-3)
-6 ) (- 1 TEHTA 0.96
3)
HATIDAH ) 0.95 24 -6 (
km
3 (1)
(2) -79
(0)
79
50
BANJARI 0.98
RAFIGANJ TSS 0.96
35 km Pan ther
79 (-2)
0
12(-3) 22 km
Moos 321 km, Quad
9) er nth (1 Pa
ther Pan
-1 (-2)
) (9
AURANGABADe
GOH 0.96
km 21
KCL
1 1k m (2)
203 km, Twin M oose
1 -1 -3) SONENAGAR ( 0 0.97 (0)
8) (-1 -50
-40 (-13) 4) 4(1 -1
0.98
1 X 250 M W
km 188
(0)
0
)
-16 (3)
198 km, Twin M oose
4.6km
NABINAGAR RLY 0.00
( -7
er Panth
EKANGASARAI 0.95 30 km Panth r Panthe 40 km 41 (10) -160 (174 ) BIHARSHARIF-PG 1.01 0.99 NALANDA
-21 (-4)
2 5(-
ose Mo ad Qu
BEGUSARAI 0.98 0.98 (8) -14 1) 9 (BARAUNI 70 0.98
MOKAMA RLY -61
8 ( 11 8)
(
-2)
28
-57 (19) 0 (0)
k -8 -2 5 m 5 2 ((-3 45 0) ) BIHARSHARIFF er 0.99 0.97
KHUSRUPUR RLY
28 km
- 26
2 x 660 M W
65
, Qua dM oose
BEGUSARAI
-4 (-1)
0.99 SASARAM 0 (0)
5k m
40
DEHRI 0.99 0.99 146 (-19)
)
BARH-NTPC 1.01 0.94
Baripahari
Fatuah
JAHANABAD
Pa nth er
89 (9)
281 (56) (1 -57 9) -25 (- 8 ) 20 km Panther
(-3
Harnaut
PATNA
JAHANABAD 0.93 (0 )
km
1 X 10 M W
Sipara BS
ARWAL 0.93 16 (-1 )
34
0.99
Khuswesthan 0.96 -13 (-4)
0 (0)
3 -7 0.94 6 63 (-51) km (-2) (2) Pa nth 34 (13) er 10 km Panther
0 (0)
32
0 (0)
SASARAM-PG 1.00 1.00 0.99 0.99
(-1 2)
MASAURHI PATNA
BHOJPUR
BIKRAMGANJ 0.98 -2 3 (-1 )
PATNA-PG 1.01 0.98 -420
km
FATUHA 0.98 0.97 -61 (-16)
-30 (-7)
32
TRIVENIGANJ 1.00
) (2 8 -1 SUPAUL 0.98
Beniapatti
DARBHANGA OLD 0.99
0
SAMAST IPUR T raction 0.99 -4 (-0 )
(-1 )
er nth Pa m k .5 39
545 (58)
KATRA
450 (45)
-15 (61) -127 (-64)
(0)
-19 (-5) JAGADISHPUR 0.94
28
-4
m
- 23 ) (-6
26
HASANPUR -0 SMG (-0) CGP 0.94
0
(0)
-27 (11)
215 km, Twin Moose 76 km, Twin M oose
ARRAH-PG 0.95 0.94
0
KUDRA T SS 0.99 -22 9 (43 ) 11 2 (-3 1)
SARNATH
27 9) (-
, Zebr a
Gaighat MITHAPUR
JAKANPUR
30 km Panther
71 km
a br Ze m 2k ) ) 11 (12 2 (7 KUDRA -32 13 ) 2 0.99 (-2 -14 0 (-4) 32 -15 m 0 Pa -1 (-7) k (7) 25 46 nth -0 6) km er (56(-12) 65km Zebra
-28 (4) 6)
26 (-1
er
-97 1) (-2
DALSINGSARAI 0.97
(-1) 6
) (3
SUPAUL
) 0k 0 (5 5
SAMASTIPUR
JANDAHA 0.96
0 (0 )
Khagul
km 40
59 -32 (-6) 15 (-9) 10 km km MOHANIA ,P an 0.99 th
a br
0 (0
NIRMALI 0.98
2 m -5 10k 8) (-2
10 km
Ze
m 50k
0
(0 ) ) 15 6(
(2) -6
22 (-5)
18
61 (- 14 )
0.99
-4
) 0 (0
ther 70 km Pan km 35 ther n ) Pa
-2 1 (-7 )
0.99 -6 (1)
9 -2 ) (-9 SAMASTIPUR
(-5)
0
4 (5 )
km 10
Be rs im is
-2
Pusauli New 0.99 0.99
3)
0 (0)
km ,Q ua d
Pa nth er
HAJIPUR NEW 0.98 0.96
Digha BIHTA
0
35 6
ALLAHABAD
km
(0 )
-6 3(
-7 (-2) ARRAH RLY 0.94 0.94
0 (0)
2k m
-25 (-8)
Beniapatti T
km 347
3) (-1 -34
0
0k m
95 (1 9)
m 2k
(2 3)
(0)
r he nt Pa
240 km
) (2
11
(-2)
(1)
-10 -6 (-2)
6 (2)
PULPARAS 0.98
DARBHANGA
er nth Pa
(0 )
Kaimur
HAJIPUR TSS 0.96
SAMASTIPUR New 0.99 0.99
MAHNAR 0.96
km
40
-5 (-1)
km 57
-24 (- 7) (-5 ) 1
24
HAJIPUR -37 (3 0.96 )
the r
DARBHANGA NEW(DMTCL) 1.00 0.99 1.00
(85)
Km 131
ther 27km Pan
0
km
VAISHALI
ther Pan
P an
0
-18 (18)
PANDAUL 0.99
1 km
-81 (9)
24 2
45 km
-51 (-16)
ther Pan
14
6 11
Vaishali 0.96
(-19)
-44 (1)
(1 8)
-348
) (0
SAHUPURI
(0) 0 (0)
KOCHAS 0.99 -13
(- 2)
5 -9
is ad Bersim 228 km, Qu
0
BUXAR KARMNASA 0.99 0
FATEHPUR
km 61.5
6 ) -1 -16 0 (
KISHANGANJ-PG
(2 )
2 - 10 ) 5 (-1
Kataiya 0.97 -3 9
) (-0
37 -11 (-5 )
85.2 km ,
1 km
-1 13
(-5 )
MUZAFFARPUR
-242 (49) 10 31 (53 )
-8 (-3)
0 -1 ) (2
32
MUZAFFARPUR-PG 19 1 0.99 0.96 ) -134 (-32)
70 km , Zeb ra
ARRAH 0.94
SE OO DM UA ,Q km 242
BUXAR 0.91 -28 (-10)
-20 (-7)
30 km
11
Darbhanga 0.00
0 (0)
40 km Pa -4 8 (-6) nther
SHEETALPUR 0.95
DUMRAON 6) 60 (0.91 16.1 km -28 28 (-1) Panther -29 (2) (-5) ) km ( -0 3 2 -3 (1) (-1) DUMRAON RLY 0.91
-2 64 (
50km Zebra
CHHAPRA 0.93 47 (5)
-6 (-2)
br a
4k m
5 3.
Pa nt he r
18
0
km Ze bra
km
(-17) MADHUBANI
27 km Panther
(-1)
(0) 68.5
132 km Twin Moose
(0 )
)
MADHUBANI 0.99
) (-3
0
m 1k
oo se
44
57.8 62km
(-56)
PAHIYA KARKHANA RAIL 0.95 -10 (-3)
0.97 0.97
(-1 9) Ze 2
-342
r he nt Pa
Qu ad M
CHHAPRA TSS 0.93 -6 (-2)
26 3
90 ) (25
11 2 (2 1
-2 3)
(0)
0
88.73 km Zebra
15.5km 16.7km
(5 )
-3 8
0 (0)
Duhabi(nepal) 38 (
55
GANGWARA 0.99 -44 -0 (1) (-6)
Mushahri
-41 (-2)
(0)
0
(-2)
21.0 4k mP anth er
1(2)
MTPS 0.99 0.98
SARAN
km
195 km ,
118 (5)
(2 2)
-64 (-17)
JAINAGAR 0.99 -13 (-4)
SITAMARHI
Motipur 0.98 0.98
52
35
419
-161
SHEOHAR
80 ) (1 8
) 13 10 (
0.98 0.98 56 (-1)
54 (-4)
) (0
RUNNISAUDPUR (3) 0.97 -8 (-2 ) SKMCH 0.97 8
km .1 30
(0 )
0
2 -5
Amnour
0
(2 3 7)
m 15 k
1 x 195 M W
SIWAN BALIA-PG
) (-2
CGP
MUZAFFARPUR 0.97
Ekma Tap 0.97
-8
-7
Pa
Zeb ra
Dhalkebar (Nepal)
(0) SITAMARHI 0.92 40 (12)
-31 ) (-9
BELSAND
PURBA CHAMPARAN 24.2km
101.35 km Ze bra
0 9 (3)
0.97
1 X 20 M W
-55 (3)
0.6 km
52 km Pan the r
-9 (-2)
0.92
km
Chaundathi (Gaya)
(0)
0
SHEOHAR (0)
(0)
(0)
40
, km
DHAKA 0.93 0
0 (0)
2 x 110 MW
(0)
MASAURHI 0.94 -36 4 (10 2) -1 55 (- 48 )
QUAD MOOSE
) 19
Hathua 0.98 -11 (-3)
-48 (-15)
6 (-6)
HFCL BIOFUEL SUGAULI 0.93
16 (6)
24 km Panther
-16 (- 5)
-16 (-5)
-45
Pant (0) her
0 (0 )
MOTIHARI 0.93
(-14)
Pa nth er
( -25
0 (0)
QUAD MOOSE
PATNA
62 (14)
87 (-10)
180 km
0
0
SIWAN 0.96
Ekma 0.97
0
25 km
r he nt Pa
Ze bra
-55
-0 (0) er
0 10 km (0) Pan th
60.8 km Panther
45 km
-7 (-2) RAXAUL 0.97
) (-1 14
1.00 -16 (-3)
km
26 km
5 km
-23 (-7) 0 (0 )
P
7
4 (1) 35.5 km
km
1 X 10 M W r the an
Moose
-11 (-3) 159 (-5)
-0 (-0)
CGP
0.5
30.5 km Zebr a
26
nth SIPARA er 0.98 0.96
km 40 bra Ze
.1 37
(4)
-7
195 km
) ( -2
CGP
, Quad 261 km
-42 ) (-13
0 12 km (0) Zebra 6 -1 km (1 5) 0 MUSHRAKH 6
-128 (- 22 ) -119 (-35) 16 1) (10 (2 ) 4 36
) (0
-4 (-1)
GOPALGANJ 0.98
0 (0)
18 k m Pan the r
24
GORAKHAPUR-PG
BHARAT SUGAR MILL 0.00
Zebra 39 km
7) 9 (-5 km
-53 (-2)
BETTIAH 0.97
1 X 18 M W
-55 ) 7 (-1
CGP
1 X 14.5 MW
GOPALGANJ
8 0 11 154 (45)
her Pant
-0 ) (-0
km 41.5
HFCL BIOFUEL LAURIYA 0.94
(6)
(3 5) (0 )
35km Pan ther
-89 7) BIHTA ( -2 0.93
SWADESHI SUGAR MILL 0.00 0 ( 0) Narkatiyaganj 0.97
55
16 km
Pa 1 km nth er
51 (1)
-1 ) (-0 CGP
1 X 14.5 MW
(237)
8 km er Panth
(0)
ARRAH-PG
419
HARINAGAR SUGAR MILL 0.94 1
KHAGAUL 0.96 0.94 DIGHA 0.94
0 (0)
50 km ra Zeb
PASCHIM CHAMPARAN RAMNAGAR -2 0.94 2( 5) -29 (-9 ) -1 0 (0) (0 14.1 )
4 1 k (1) m
23 km Panther
(-1) Pa nt he r
0
KHAGAUL TSS 0.94 -4
BALIA-PG
CHANDAULI
5 -9
JAKKANPUR 0.94
(0)
77 .8 km
VARANASI
KARBIGAHIYA 0.94 -59 GAIGHAT 8) 67 (8) 0.95 (-1 28 0 -31 (0) (9) (2) KATRA -75 0.95 (0 (-11) ) 1k m MITHAPUR 0.94
22 (-2)
0
3 X 5 MW
(-14)
-67
(2)
VALMIKI NAGAR HEP 0.93
Power Research & Development Consultants Private Limited #5, 11th Cross, 2nd Stage, West of Chord Road, Bangalore- 560086, INDIA Ph : +91-080-4245 5555 E-mail :
[email protected]
14 Golf Club Road, Tollygunge, Kolkata, West Bengal 700033 LOA details: ERPC/PR_DBASE/2016/3567 Dated 30 March 2016
DRAWN IN :
MiP-PSCT
TM
DWG. NO. : Geographical Power Map\ER\May-17\Bihar
N
TOWARDS KAHALGAON
Geographical Diagram of Existing Jharkhand Network (May-17)
an
th e
SAHIBGANJ 1.00 r
26
111 km, Quad Moose
oose Twin M
95 km , Pant her
172 km ,
105 km, Panther
(-6 )
29
)
48
355 (24) 15 (-3) -298 (-15) 21 (61) 692 (125) (-109) -62 -192 (-26)
-127(46)
(-6)
-357
(-1 7
1 (-6) 0 (0)
Lark
75 km
5 (-2 0 )
30
-7 (-5)
9.7 km, Panther
-9 (-8)
-5 1 (2 )
)
(1 7
(-29)
36 (4)
51 24 km ,P -22 ant he r (-5)
M
oo TOWARDS se
BURNPUR
73 km,
Panther
TOWARDS DSTPS
54.9 km , Zebra 54.9 km , Zebra
TOWARDS MEJIA
-1(22) (-22) 6 0.1 km (8)
8.3 km
HYDRO
(-6)
-89 (14)
-19
(3 )
111 -111
(-9)
) 268 -268
4(-3
-34
(-4 7)
)
-25 5( 13
-51 (-15)
ra -47 (-8 )
eb
,Z
km
.5
34
-0 47( (-0) 8)
THERMAL
in M oose
(-11)
CHECKED
DRAWN
DESCRIPTION
R0
12/9/2017
REVISION
DATE
REMARKS
SUB STATION
-14 (-2)
765 kV 400 kV
6 ( 2) -6 (-2)
-21 (-7)
(-7)
THERMAL-IPP
IPP
220 kV 132 kV
in
-37 (-22)
se Moo
TRANSMISSION LINE
Tw km, 116
in Mo ose
141 km, Tw
(25 ) -18
(0)
105
(-17) -253
20
TOWARDS JODA
THERMAL-CGP
CGP
39 km
482 (89)
-9 (-3)
1 km
-6
(-2)
(-0)
-34
46
, Tw
km ,T w
in
M
oo se
-33 (-2
an th er
km ,P
20
32
(2)
0 (0) r
the
Pa n
26 k m
LEGEND GENERATION
)
(-4)
-12
0 (0)
-0
r th e an ,P
a , Zebr 130 km
Jharkhand state existing network (May-17) geographical map REVIEWED
TOWARDS KALAPAHARI
EAST SINGHBHUM
km .75 ) 10 (8 43 -43 ) (-7
km
TOWARDS JAMURIA km ,T w in
37 (11)
-12 (2)
-2 (-1)
-11 (-5)
-3 (-1)
r an th e km ,P 10 (6 )
270 ose , Twin Mo 72.5 km (36) 0 35 ) RAGHUNATHPUR 2 7 (-1 1.03 ose RTPS Mo in 1X600 MW , Tw
her ant
42
62 (111)
-33 (-5)
-32
67 (9) -11 11 15 km (5) Panther (-4)
-3 (-2)
(-4)
-9
-3 (-0) 4
-15 7(7)
-0 (-0)
km ,L ar k
-90
36 .0 2
7)
(-1
-38 (-4)
) (-11 -69
46
3 (0) -3 (0) 15 km, Panther
-89 (4)
-10 (-8)
nth -28 (6) er
km , Pa
28 km, Zebra
7
(0) 30 (7 28 ( ) -5)
12 (12)
-4 (-6)
er th
ose
an ,P
ther
145 km , Twin Mo
455 (67)
10 km 0 Lark (0)
m, -41 Zeb (ra 10 ) ra -30 (-5)
40 (10 ) 28 k
42 km, Zebra
44 km, Zeb
e
Mo os
ad
km , Qu
78.6
-72 0 (118 )
) -117
(151
392
-31
97
se oo
(-10)
TOWARDS PARULIA
M
(72)
(8)
-11 (-2)
88
MAITHON_B2 1.01 / 1.00
in
km
-3 (-1)
e os Mo
w ,T km
71 k m, P anth er
74
8 -4 ) (41
n wi ,T km
) -18 2 (
11
(4)
765 kV 400 kV 220 kV 132 kV
TOWARDS BARIPADA
LOAD
TOWARDS TOWARDS JODA JSPL
Load
Power Research and Development Consultants Pvt. Ltd.
Eastern Regional Power Committee
APPROVED
Pa
(-1)
-24
-20 (-6)
84
19
(8)
) (-3
-0 (-0)
0 (0 )
0 ) (0 1) (-1 (-7) 1 -1 -16
bra Ze
16
, Pan 30 km
P m, 4k
, Tw km 131
9 (4)
, km
9 -2
(-1)
-56
WEST SINGHBHUM
2) -6 (-
TOWARDS ROURKELA
e o os in M
STPS
bra , Ze 8 km
, km
er nth
-8 (-1) JAMTARA 0.95
Pa nth er
km ,
)
-4 (-1 ) 4 km Pa 3 nt h (2 -3 er )
1 rk (-2
km , La
24
22.6 km
-2 (7) -1 (3)
185 (40)
-10
10
0 (0)
km
(6 5
)
-38 (-27)
-20 (-4)
-38
(-16)
2 (-5)
30 ) (10
-5 (-2)
12.5 km ,L ark
50 (5)
(-2)
)
-24 (-1
-5 (-2)
-10 (-3)
-10 (-3)
-519
(61)
(-5)
-9 ) (-4
-49 (10)
42
NAMKUM 0.95
28 (1)
MANOHAR 0.97
) (15
-13 5 (-0) 13 0 km (1) ,P
SARAIKELA
SIMDEGA
-71
-93 (-37)
9) (2 39 -4
95 -2
HEC 0.97
LODHNA_R 0.97
ther
KAMDARA 0.95
an km, P
er nth
DHANBAD
-0 (242) Tamar 1.00
1.00
PAKAUR
km 9 153 an ADHUNIK IPP CHANDIL 40 th e 30() 2X270 MW 0) r-131.01 1.00 (-15 ) Adhunik TPP JAMSHEDPUR_PG (2) (26 53 km 1.02 1.02 1.01 -21 0.3 km 168 km, Twin Moose 488 CGP 155 (53) MANIQUI Quad Moose 0 74 TATISILOI_R 1 km 0.94 USHA MARTIN (1 177 km, Twin Moose 7) MANIQUI_D (46) 78(38) (0) (-4) 486 0.95 MANIQUI_R 0.94 2X10 MW 35 k 0. 5 km m, Z 2 653 (64) ( ) 1 0.94 13 ebra 1) 83 -51 ((1) 4 km 156 km, Twin Moose -16 4 APL 16 3) (-13) 1.01 -7 4 (1 3) km (-14 1 RAJKHARSAWAN_R (- 4 RAMCHANDRAPUR ) 0.99 1.01 1.01 -8 43 6 .74 (-3) -6 2 5 km k 9 m, 8 (3) , Pan ADITYAPUR GOIELKERA USHA MARTIN Pa ther (-10) nth -19 1.00 0.97 3X300 MW er (-6 -31 (-2) 1X25 MW ) 31 (3) 55 km, Panther CGP 19 -19 (-8) 1 -4 1X15 MW 0 9 ther 3.5 (6) ) 36 km, Pan (10) k (-5) (0 r he m CGP nt ,P km, Pa 0 22 a r nth USHA e RAJKHARSAWAN (0) 0 -8 8(-1) er nth CGP a 0.99 MARTIN ,P (-7) 55 (4 (0) TOWARDS km 1.00 ) -0 4 km, Panther 22 CHARADHARPUR PARULIA 22 0.99 GOIELKERA_R (-0) 0 (0) GOLMURI 9 km 0.97 , 1.00 -9 Pa SALGAJHARI_R CHAIBASA -12 (3) rk a TOWARDS n L 2 , 1.01 1.01 0.00 1( th m (-3) -0 er (-4) 87 k KTPS JADUGUDA TISCO ) -9 CHAKRADHARPUR_R -21 0.99 1.02 1.01 (-7) 0.99 (-3) KENDPOSI 343 (16) TOWARDS 0.98 KHARAGPUR -28 -28 , Lark 3 (3) 26 0 km 95.5 km 22 (-9) -195 (9) MOSABANI 88 (1) , Pa ) (5) (32 0.93 -5 nth (3 ) er (-4) 2 DALBHUMGARH_R -71 (5) 70 -26 JAMSED_D 8 -5 0 (11) (0) -6 0.93 0.97 0.95 39.6 km, Lark ) CGP 0 (-57 CGP (-2) IPP (0) JOJOBERA CHAIBASA RUNGTA 3X120 MW 1X67.5 MW 0.98 2X20 MW CHAIBASA (45) 1.02 1.01 30 DALBHUMGARH KEND FD STN NOA 0.93 0 0.98 4 km, Panther (0) MUNDI 0.00
0
Pa km, BAKASPUR_R 61 ) 3 (1 0.95
(2) r 3 the Pan m, 5k
) (4
41 (1)
-7 (5 )
er
USHA MARTIN 0.95
(0)
6
anth
35 km, Panther
)
9
0 (0)
(-3
r he
BANO_R 0.00
m 1k
er nth
t an ,P km
62 k m, P
40 (21)
7
-42 (-0)
a ,P
27 km, Panther
-9
oose Twin M
-41 (-21)
-105 (-34)
HATIA_O 0.97
7 (-2)
RANCHI
86.1 4
-89 (-8)
94 3) (2
, 405 km
62 km, Zebra
m 1k
(-5)
TOWARDS SIPAT
Mo os e RANCHI_PG 1.02 / 1.01
m
GUMLA 0.95 -18
TOWARDS DHARMAJAYAGARH
ua d
r the an ,P km 34
1k 30
km ,Q
-0(6)
km
69
-32 (-10)
LOHARDANGA 0.96
6 4.
(3)
-4 5 (-2 )
34
-40
LOHARDAGA
-30 (-8)
JAMTARA
5 29
CHANDWA_JHK_POOL 1.00
) (-0
ra
km
km ,Z eb
) (-9 0 km r -3 .1 0 12 nthe -1 ) Pa (-4
56
6.9
(5 )
LATEHAR 0.95 45
) (28
-43 (-5 )
-2 (-1)
BOKARO
-29 ) (-1
a
) (4 -9 (-4)
-347
er
eb r
ECR_R_D 0.96 10 (3)
-33 (18)
33 (-12)
-1 (4 29 53 3) (10 )
(-12)
nther 68 km, Pa
0 (0)
-22
Panth er
(-0 )
MADHUPUR 16 0.95 (4) 54 km -1 7 ,P an (1) th er -25 (-4)
GIRIDHI 0.98 -94 (-27)
km 45
HAZARIBAGH th an
km ,Z
DEOGHAR 1.01
PAKUR 23
DUMKA 1.00 1.01
-3
ra
7.6 km, Zebra
e oos
-33 (-10)
, 43.6 km
(30)
th er
eb
TOWARDS FARAKKA
85
DUMKA
DEOGARH
6 15 5) (1
in M
22 (16)
11 km ,P an
NIMIAGHAT 16 BALIHARI_D -47 0.95 45 (-1 0.94 km 7) KONAR (-15) ,P HAZARIBAGH 0.96 an RAJBERA_D t h 0.93 PUTKI -11 BAIDA_D er 0.97 40 -16 0.94 0.96 (-3) -30 (3) P.KANTHA ( 20 1 (-8) ) 9 0.94 -146 (-2) 4. (-61) CTPS 9k 59 r 1 3X140 MW m e MAITHON_B1 GUMIA_R ) ,L th NORTH (64 1.02 ar an BTPS GEN k JSPL KARANPUR se ,P 4 km er SINDRI 0.96 1X500 MW Mo o 0.96 km th -20 (5) 0.94 w in (23) 32 km, Lark ) 20 (-2) 20 T n 0.5 km 0 32 km -10 , 4 3 46 -10 Pa 70 -47 (-6 1 km 207 5 BOKARO_D MAITHON RB 3 3 (-4) 2 Lark (-2) PATRATU_D 0. 6 (9 3 ) 1.02 4 2X525 MW 1.03 -1 ) (-170 0 (21) km 8 0.96 (-24) (21) 4 -90 (-26) -20 CTPS_OLD 513 ,L (0) 4 ( IPP (126) PTPS 41 km ar -7) PATARDIHI 0.98 0.97 , Pant 0 (0) ) k BTPS B her 2X100 4X50 1X110 (12 (-13) 5 0.99 0.97 -4 1 0.94 -4 -304 MW MW MW 1 1 ) 4( (8 (0 -71 (-2 49 (28) 60 km, Lar -12 (-3) (-2 7) 9) 0) k ) 13 0 -39 BSLG 54 ) .6 162 k 2 0 km, Ze MAITHON_D 9 m 86 (-96 -41 141.8 km .6 (-8 RANCHI 0.00 bra (1 , Zebra 49) BTPS (31) 0.97 (-18) 1 (-22) er Ze km 8) 17 3X210 MW 0 -163 (-22) (-25) (NEW)_PG CTPS_N 30 th 6 BSL br (0) PTPS K'DUBI -6 (-2 an 3 4 0.98 (67) 160 RAMGARH_D (0) a 1.01 / 1.01 P 0.98 0) 2 , BSLT 0.99 / 0.99 6 m 0.98 0.97 0.96 5 -8 / (4 k ) .3 6) 0.00 33 (-0 km 7) 1.6 0 -12 (15 (5 55 1X23.2 MW ,L BSLG KALYANASWARI 150 ) km ar 0.96 31.84 -0 2X20 MW PANCHET 8) 1 X 31 MW k ,Z -85 km CTPS (-1 eb -12 SIKKIDIRI -0 (0) (-0) ra , Lark 2X250 MW -1 0.98 (-1) (-17) 124 14.4 km ECRBR_D 7 ECRGMD 9 (2) TTPS -4 (2 (-2) 0.00 2 1.00 64 ) 65 RAMKANALI (-1) 71 TVNL km 0.97 ( 13 PANCHET SHPS GOLA 45 2X210 MW ,T 2) 2X38.4 MW 0.98 0.96 w in -6 DHANBAD (12) 2X65 MW 191 -33 Mo (-2) 62 52 km, Zebra 0.98 0.98 INLAND o (-9) se (33) CGP (11) se 1X70 MW Kanke 30.2 57 km, Lark 58 oo 9k M .62 0.97 302 (25) SERMURI 119.2 km, Lark m, n km 3 Lar wi k , Z 2 (2 126(63) ,T ) 3 4 e m ( 9 br k 188 km, Twin Moose (2) -4 a ) -21 53 1 (3) -36 (-2) 3(-5 ELECTROSTEEL_D -51 1) 260 (52) 200 km, Twin Moose (-4) -31(1 0.98 GOVINPUR_D MAL 1 (-3) 35 21 ) 0.97 22 km, Zebra IMPEX FERRO km 2 (5 0.97 , Z 4) 169 km, Twin Moos 78.4 km, Zebra e 96 (-9) HATIA_N ebr a 155 km, 0.99 / 0.97 -262(23) Quad Moose P m,
64
3
(1)
2 km , Ze bra
-12
-5
-3 (-1)
ad Mo ose
-16 (-3)
43
.1 k
TILIYA 2X2 MW
8)
,P
anth
km
0 (0)
47 (1
61
100 .9
-47 (-21)
, Qu
k 82
DALTONGANJ 0.94 -43 43 (-13) (9 )
km, P
CHATRA
KODERMA Tw km, 100
PALAMU
an the r2 4 (3 er -48 (-16 ) )
BARHI 0.95
36.5
CGP
20
25
24 (15)
ABCIL 2X30MW
277 km
GIRIDIH
-27 (-12)
-4 3
th er 1) (2
(0)
(3)
16 8 km -16 (2) Pan ther (-2) TOLRA_R GARHWA 0.97 0.97
-42 (-6)
1 0 (7 )
(-1 3
)
0
)
an
-78
50
nthe r
29
-16 (-2)
, Pa
0 (-2
SHANKARPUR 1.01
KTPS 2X500 MW
456 (117) CGP 12 (-3)
346
106 km
KODERMA_D 1.01 / 0.98/ 0.96
(74)
km ,P
KODERMA_D 0.94 18.3 km -15 94 Panther -95 (36) (-37) (-4)
(-2)
JAPLA 0.97
(-23)
(1 4
5
an th er
-2
TOWARDS RIHAND
-451
-2 (-7 22 5)
km ,Z
GODDA
M oo se
)
-16 (-2)
ua d
m ,P
(-1 1)
182 km, Twin Moose
km ,Q
k
r 41
SAHIBGANJ TOWARDS SULTANGANJ
(104)
12 6
, Lar 149 km
an th e
(7 )
79
TOWARDS SONENAGAR
km ,P
29
-23 (-7)
TOWAR DS RA JGIR
TOWARDS BIHARSHARIFF
TOWARDS GAYA
56
11 km (4) 50 h er t -11 Pan (-1)
(15
1.02 1.01
-29
LALMATIA
(-5 ) (-4 )
)
16
-11 (-4)
km ,P
(-8)
47
-25
TOWARDS KAHALGAON
#5, 11th Cross, 2nd Stage, West of Chord Road, Bangalore- 560086, INDIA Ph : +91-080-4245 5555 E-mail :
[email protected]
14, Golf Club Road, Tollygunge, Kolkata, West Bengal 700033 LOA details: ERPC/PR_DBASE/2016/3567 Dated 30 March 2016
DRAWN IN : MiP-PSCT
TM
DWG. NO. : Geographical Power Map\ER\May-2017\Jharkhand
Geographical Diagram of Existing Sikkim Network (MAY-17)
North Sikkim
(-0)
12 km Do g
(2)
PAKYONG 8 0.99 -5 (-1) -3
Pan the r
(-1)
RANGPO-PG 1.00 / 1.00 1.01 21 46 (4) km
49 km Pan the r
-26
-46
CHUZACHEN 2 X 55 MW 1.02
(-5)
(-4)
72 (13)
IPP
21km
East Sikkim RONGLI 0.98 -1 (-0)
LEGEND
3 RONGLI-HEP (1) 2 X 3.125 MW 5 0 (0) km 0.98 0 (0) RHENOK 12 k 0.98 Dog m 2 -2 (1) (-1)
PARTICULARS 400 kV SS 220 kV SS 132 kV SS
148k mTw inM oose
66 kV SS 400 kV Line
15 km Do g
90k mP anth er
South Sikkim
220 kV Line 132 kV Line
TOWARDS NJP TOWARDS KALIMPONG
SYMBOL
-2 (-1)
110k mTw inM oose
18km Dog
LLHP 2 X 6 MW 0.99
0 (0)
(-0 )
-7
(14)
MELLI 1.01 2) -7 (-2 (-1)
BULBULEY 0.98 -5 (-1)
Dog
-9
(-2)
4
(-3 -10 ) -12
14(3) 26 (6)
(-1)
-0
-87 (18)
(-3)
26km
(-1)
-3 (-2 0)
-47
-22 (-3)
(-1)
(0)
(10)
-1
MELLI 1.01 1.01
87
-17
Dog
Panth er
-3 (93)
528
(0)
714 -3
(-1)
(31)
55
-3 (-0)
22 km Dog
1 (-0)
-5
(-0)
r he nt Pa km 17
MAMRING 1.00 -7 (-2) (2) 7
(1)
-0
-1
NAMCHI OLD 1.00 22 km Dog 5 (1)
NAMCHI 1.01
-1 (-0)
10 (3) RANIPOOL 0.99 -3
(-2)
31
5) (-1
5 (1)
-8
524 (39) 23 (-1)
g Do km 10
0. 7 km
SICHEY 0.98
4 (1)
) (152
-2 (-0)
Dog
2 (0)
(1)
3
(17)
br a 26 km Ze
West Sikkim
RAMMAM
12 ( 5)
15 km Dog
25 km Zebra
r the Pan km 32
ROTHAK 1.00
5 km Dog
9 -119
) (-8
(22)
9 km
-1 (-0)
GANGTOK-PG 1.01 0.99
-34
TOPAKHANI 0.99
SAGBARI 1.02
10 km
NEW MELLI-PG 1.00
og
8 km
54 km Panther
17
(4)
-31 11 km D
(9)
1 (0)
(-15)
-14
km 0.3
-1 (-0) SORENG 0.99
-23
-17 (17) -15
(-16)
(-9)
KURSEONG
g Do km 25
JORTHANG 2X48 MW 1.00
-5 (-1)
-4 (-1)
(-0) 34
14
IPP
Mo os e
(1)
g Do km 18
(-3)
(15)
27 km Panther
Dog
-4
ose Mo
-63
km 13
-2
(1)
47 km Tw in
win mT 2k 12.3
(-0)
-39 (10)
68 km Panther
2
-71 2 (39 )
-2 (-1)
) (-28
RABANGLA 1.01
RANGEET-III 3X20 MW 1.02 1.01
m 20 k
3 (1)
m 4k g Do
15.5 km Panther
3 (1) 0
(1)
TADONG 0.98 5 -52
) (-1
-2
1
0
(0)
PHODONG 0.97 -1 (-0)
0) -3 (-
-13
Dog
-1 (-0) GEYZING 1.01
GEYZING 1.01 1.01
(7)
2
MANGAN 0.97
12 Do km g
TEESTA-V 3X170 MW 1.00
1.00
2km
(1)
-2 (-1)
57
PELLING 1.01
(-0 0 )
(-1)
TEESTA-3 6X200 MW
Dikchu 0.00
0 (0)
(-1 )
MEYONG HEP 2 X 2 MW 0.97
TOWARDS Kishanganj
66 kV Line
TOWARDS BINAGURI
Load Hydro Generation IPP Hydro Generation
Sikkim state existing network (May-17) geographical map.
R0 APPROVED
REVIEWED
CHECKED
DRAWN
DESCRIPTION
REV.
Power Research and Development Consultants Pvt. Ltd.
Eastern Regional Power Committee
#5, 11th Cross, 2nd Stage, West of Chord Road, Bangalore- 560086, INDIA Ph : +91-080-4245 5555 E-mail :
[email protected]
14, Golf Club Road, Tollygunge, Kolkata, West Bengal 700033
15/09/2016 DATE
REMARKS
PO details: ERPC/PR_DBASE/2016/3567 Dated 30 March 2016
DRAWN IN :
MiP-PSCT
TM
DWG. NO. : Geographical Power Map\ ER\May-2017\Sikkim
IPP
(-2)
0.8 km
141
72 (-22)
ra 40k m Zeb
-6 (6)
-31 (-9)
0 Ze bra
81 .5k
m Ze
bra
Alipurduar 1.02 1.02
-35 (5) an
th
161 (234)
-42 (-44)
81.5k
m Ze
bra
114km TwinM oose
-161 (-48)
Moose
4
(30)
4
(30)
Salakatti
Bongigaon(NER)
0
Pa
nth e
r
(0)
km
(-4)
220 km Quad
(-7)
Alipurduar 1.01
217km Twin Moose
-17
37 (-1 6)
-4 (-18) -4 (-18)
-35 (5)
-42 (-44)
er
19
(0) 0
2 7 (-8) (0 )
-37 22 (-6 )
nth er Pa
(9) 78 km
-22
(0 )
8 16
18 km
Tw in m
ALIPURDUAR
19
20
km
1.00 0 (0) 3X7.5 MW
31 (11) 83.8 km Panther
er th n Pa
(-8)
er
h Pant
16km
se oo M ad
e
(0)
0
km
98 km
Qu
oo s
km
M
8
50km Panther
TCF III
-0 (-0)
-59
Coochbehar
(-19)
1.01
Mathabanga
km
16
8k
114km TwinMo ose 217km TwinM oose
16(8)
44 (-13)
3X7.5 MW
0 (0)
Tw
in
16
(0)
Moinaguri Pa 1.00 nth er
-63
Twin
km 11 5
er 43km Panth
Moo se
M oo Tw in
Tw m 1k 12
1184(-194)
50 km
-7 (-2)
e oo s in M
se
m Ze
bra
145km Zebra
80.8k
)
-1 0(1 3 4) -54 (-18)
m
4)
11 8 4(19
0
km
Pa
M
6k
103(-13)
11 9
0.96
-31 (-10)
66km
e
oo se nther
oo s
41
3X7.5 MW
1.00
1.01
34 (6)
-16 (-5) -38 54 (1 7 km ) P
Birpara
) (-6
M
129(-6
-42 (-10)
Pan (-7) the r
-21
31
31 .3
(-1 0)
km
69km panther
25 (-5)
km 8
35 (-7) -46 (-15)
(37) -152
bra
TCF I
km
Pa
34 (6)
39
km Ze
1.01 1.01 7 (9)
-16(-6) er nth
er
Alipurduar Bongigaon(NER)
1.01 1.01
TCF I
Kishanganj
Birpara(PG)
Zebra
4) Tala 6 (6 -17 ) (30 -95
nth Pa
10 8
Banarhat se Moo
JALPAIGURI 80km
e
km
Qu ad
se M oo
) 0 (0
6)
Tw in Twin
os Mo
67
km
km
98 km
43
0 (0)
11
in Tw
(7) -40
8
1.00 12 1
3 (1)
16
Chalsa
Binaguri
(1)
r
150(-1
-3 (1)
(7) -8 0
ther 90k m Pan Zebra 80.8km
a
217km Twin Moose
(0)
31 (-10)
114km Twin Moose
0
br m Ze
Birpara(PGCIL)
) (149
Binaguri
14 5k
Moinguri
e nth
-587
3X9 MW
m 5k
2X4 MW
-8 (-2)
83 (183)
) 1 2 (10 6
-0 (1)
Pa
-864
Chalsa
80km Zebra
(-34) -7 (14) 95 83 (183)
14 (1 )
km
) ) (168
) (-7
(19
-587 (149)
her Pant 78 km r Panthe 41 km
(-93) ) (0 257
Malbase
-864 (168)
34
-16 9
0
25
(1 3)
4X33 MW
18km Panther
(2)
br a
(-5 )
-152 (37)
-0
Ze
1.01 -221.00 (9) -45
) (-9 -12
35
(-13 ) 58 (-9)
NJP
80
(2)
km
6
10 km Panther
km
2) 79(3
-3
er ) nth Pa 5 (-6
Pan the r
se
km
-34 3) (-
6
km
km
th an P
er
1.03
38 (-9) -31 (11)
69
16
4) (-1
(-1 8)
90
10
-58 (9) 16 9
m
(7)
m 8k
45
SiliguriPG 1.01 1.00
8k
35
1.00
) -7 (4
ther 90km pan
-12
km
1.00
1.01
Malbase
110 km Twin Moo
Ujanoo
5) 8( -2 -6 (14) -14 (-0)
NBU
1.00 7 (-3)
132 (9)
DARJEELING 2X40 MW TLDP 4
Kerseong
Tala
Siliguri
1.02
38 km Zeb ra
Rangpo
TLD 3
) 1 (6 -13
Labong
65.5
Ramam III
Melli
(-1)
km
TLD4
1.00
(7) -26
TLD3
45 km
Lebong (-6)
38
Kurseong
55 km
)
20
(1
(7)
4X12.75 MW
(9 ) -36
-3 8
110km Twinmoo se
27 km
6) 1.01 62 (-1 12
-119 9(152)
West Bengal state existing network (May-17) geographical map
58 2 (77 )
86 1
95
(-7 9
km
)
Pa n
th er
Purnea
Kishanganj
26 km Panther
(0 )
(5)
1.01 1.01
-98
(-5)
5
m 1k
-9
r the Pan
(20)
-27
1 km 125 (3) Zebra
(-8)
0) (14 95
(0)
-125 (-2)
Dalkola (PGCIL) 1.01
0
189 (-21)
UTTAR 0DINAJPUR 41km Zebra -56 (3)
Purnia
bra
96
-53
(0)
m Ze
75
km
16
7k
m
68km Panther
in Tw
e os Mo
0
11 6k
-2
) (2
Kahalgaon
75
Pa nth er
39 (1)
km
Pa nth
3
er
-40 1
(-2 )
(-19)
35
km
)
Samsi se oo inM Tw
0.94
0 (0)
(-22)
68
km
in Tw
(13)
95
-32 km
9
32 Mo 4 os km (5 e 4) Pa nth er
ose Twin Mo 71 km
89 (-5)
.5k
m
-89 (-29)
0
(0
) Pa nth er
-30 (-9)
-99
40
(0) 0
Haldia
-98
0 36
(2)
-122(-1)
se oo M in Tw m 0k 20
(-48) 1
36km Panther
357(63) (0)
-48 (-17)
-71
0
0 (0) -50 (-16)
80km Tw in Moose
50 (6)
40kmm Zebra
3) -128 (-2
m 8.3k
245 (3)
)
45 (1 7
11.1km Panther
er n th Pa
) (-8 24.1 km
0 -7
(8)
(-12)
Ze km 32.5
-186(2 3) -178 (44) 55km
-45
5 0 (-11) 2 0 (-11 k m ) -5 Ze 0 br a
27 (31)
-140 (-25)
Zebr a
(2 0) 0
83
0.5km
-39
(-1)
-81 (-35)
17.3 km Panther
bra 80(23)
a
01
4 37
km
Z eb
-485
-61
km
Ze
bra
ra
(-71)
Subhashgram-PGCIL 0.99 0.97
ra
-3
64
(-9)
24
8) (-2 -27
546(180)
0.6
20.7
(56)
-5
(-2 3)
-8 178(-7) 0 (22 )
22 km
km Ze
ze br
0.97 0.96
-78 (-26)
m .5 k
53
Kakdwip 0.93
45
(-2 )
-4
Laxmikantpur 0.95 0.94
(-8)
CLC
5 (6
-104 Kharagpur (-22) (DVC)
(4 0)
) (-111 -549
ose
(-8) NTAA-III 0.97 0.95
Ze b
Mo Twin 90 km
er nth
34 km Panther
4) (-5
-48 3)
km
Falta
24.5km Panther
se oo
in m
m
Tw
29 k
6k m
(3
)
6k m Pa n th er 72 (20)
-38
13 .3
7.35 km
4 (17 18
(1 0)
(0)
59
) (-3
-8
0.97 0.97
(-10)
-14
29km Panther
Ze
Subhashgram-WB
-33
(1
40 (1 9 )
43
-63 (0)
-64
-67
(-7 )
0
70
12
km
Basirhat
(-3)
0.92
r the P an
13 km Panther
-124 (-31)
(-21)
-33 (-8)
b Sonarpur ra 0.96
0
Sirakol
21km
0.94
0.94
NTAA-I 0.94
0.97 0.97
-71 P an th er
24
km
(6 )
49 6
(0)
Salt lake 0.95
-83 (-4)
) (-17 -46 -40(-19)
(-13)
-78 (-26)
CHPR_R 0.97
-59 (-5)
0.
32 (1 7 k 0) -3 m 2 (Pa nth 2) er
0
er nth
km
50 (1)
(4) 60
)
7.8 km 4 km 86 Panther 0 (0 Pan -1 ) (-60) ther 03 (9 )
9.8km
Pa
m 6k
Kasba
-62 (-20)
(0 )
km
er nth
137
13
Tw in
19 km Zebra -61(5)
(-1)
-118
16.2 km Zebra
80 (1)
-82 (-2)
(-33)
18
(-1 )
-32 (-9)
Pa
9.3km
se M oo
216 (52)
9)
(-3)
0 (0)
7)
5.4
km
(1
49
-123 (-13)
) (-2
km 24 6
1 (1
58 -82
-58 (-8 ) 63
-21 (-9)
0
-111 JOKA (-26)
0.91
27
) (0
km
0 (0)
(2 9)
(0)
0
er nth Pa
-18 (-6) -83 (-28)
er th Pa n
km 14
66 (1 7)
Jadavpur PE 0.97 XL
5.5
0 (0)
(-91) (18) 2 12
) Pa nth er
IPP
-189
Pa
(6)
10 .9 6k m
m 9k
m
km 35 (9)
3.5
Pa nth er
17 (25 )
28
)
-105
m
(-0)
P Circus -103 0.96 (-7
62 (-1)
sq
(-15)
-101
5.56 km
0.96
-32
(3 )
PE XL m er qm n th 0s Pa 80 km -70 11 Patuli (4) 0.97
Majerhat 0.99
-35 (4)
PRS
32
8.5
-0 (-0)
Salt lake GIS
-33
BT road 0.94
161
(16)
Mahispota
Barasat 0.92
Dumdum 0.97
2.5km Panther
East kolkata 0.97
km 6. 56 -37 (-12)
)
4.3km
17km
0 80
(7
(0
)
TRS 0.92
1.5km Panther
-81 (3)
3X60MW IPP
38 (-3)
0.93
Parklane 0.97
0.96 0.97
IPP
Kakdip 0.93
10 km Panther
-13 (20)
(-3)
-10
m
82
-149 (-19)
1)
NCSS 0.96 0.97
4.4km
EMSS -42 (7)
(-9 ) -37 (17)6.4km -21 (-0)
/C D 18 ) .7 km
k 85
m 3k
(-1 6)
-6 (-2)
6 (2)
(0) 0
-109 (-7)
13(-6)
20km Pan ther
(35 )
18 1
2.2 km
(0)
-21
(-4)
(8)
km
M (-3 oo ) se
6.1
3
(-6) km 1.37
-8
0.98
6km(-10)
234 (12)
er
-39 (-35)
Belur
-119 (2)
(-2) 50
th
n th Pa
(4)
-8 (-2)BBD bag
3 -3 (10 ) 0.8
13 1
-13 2
(-4 )
-234 (-4)
oo 4 se
M /C D
(-1 5
1.01 1.00 234 (72) 56 4 ) 2X250MW (32
1X250MW
-4 20.0 35 9km
45 (2)
) (0
0
21(5) ) (-9 6 -6 -6
Taratala 0.99 Chakmir 0.99 -73 (-30)
KTPS
.5 k
SOUTH 24 PARAGANAS
1.1km
Pa nt her
27 km
49.7km
South R S 0.99
n Pa
km
10 .3 6k 3 km m
303 (35)
-34 (-2 1)
-133(-13)
a br Ze
km
km
8 (2 ) 1 -51 -80
(-49)
0
-20
(-2)
-26 (-9)
71
(2)
-108
Botanical garden
0.94
F PARK 0.96 0.95
1
-39
) (13 06
bra Ze
24
Howrah 0.95 0.95
4) (-3 er ) th -81 (23 P an 18 14km
-60
(-22)
26km Panther
er n th Pa
(0
)
km 10
-5
58 km Panther
Pa nth er
-88
m
bra
)
6 (-1
(-4 7) (-23)
-5 9
-77
-17 )
km
(4 7
10
76
)
27
(-2 7
25km Panther
(-24)
-96
360 (40)
km
8 (-0)
31
-45 (6 ) Pa nth er
34
53
(-4)
-21
) (3 -1 a br (2) km Ze -4
14 .5 km 57.3
Kolaghat 3 6) DVC 13 (1 -106(-6)
m
-2 (-2)
-43(-9)
87
-20 (-7)
(4
5)
-2 (-1)
-14 (-3)
-70 (-23)
-4 (-2)
-2 2 (-13) (13)
-6 (-1)
(-45)
25 k
-1 (2 9)
Pant her
26km
-32 (-11)
(-19)
-91
-5 1 (-1 7)
-61 (-19)
56km
(13) 10 4
-44
(-14)
km
45
-87
Pan
Contai 0.93
-104 (-22)
(-11)
(-15)
-42
-93 (-31)
-4 (1)
(-1 )
18
(-14)
89 (5 )
(-3) -9 (-2 ) 1 (-0)
(0 ) -4
0 -67 (- 27 )
54 5 (1 02 ) (-1) a Ze br -105
er th Pa n
mankar 0.95
m .5k 37
-95 (-3
Motor 0.00
-6 (-2) LILU 10 -10 ) (3) (-3) 0.94 er 39(-2
5.4 km
52 (-
km
-1
6) -5 2 (2
-42
-66 (-12) (26) -114
25 )
er Pa nth
32 km
224 55 km
KTPS
2 (3) Howrah (dvc) 0.93
Uluberia er th
0.95
0
(0) Hind
7km
Park Food Park Food0.93 Tap 0.93
-64 (-8)
(-28)
-14 (-4)
Rishra_CESC
(96
33
Laxmikantpur 0.95 -78 (-26)
17
-79 (-17)
r he nt Pa
(0)
0
-84
32 (6) 32 (6)
-32(1)
km .2 35 3)
(-21)
) 4 (1
-75
(-1)
-4 8 0(4)
9)
(1
6 19
(-21)
-0 (5)
oo se Tw inM
57km panther
24 6km
(-26)
-0 (-0) 0 (0)
2
nther 18 km Pa
-48 (-16)
-74
80 (34 )
5) 111 (-1
) (40
(6
) Pa nth (14) er
km 24
-54 (-17) br a Ze km 71
-10
10(5)
26
42 km
(-6)
40km
(-7)
-33
(-13)
-48
Tw 13 0 km
(-11)
-49 (-18) os e in Mo
-82
5k m
22.7km
se oo M
Dankuni 0.93
6.4 km Panther
(0 )
IPP
in Tw
(18)
km
Titagarh WB 0.92
(-23)
-32 (1)
er nth Pa
(2) -12 -98 2 (1) -549 1) (-11
km
km
-37
25
-71
0
-8 (-2)
-88 (-16)
9
m 7k
-2
er nth
103 (24)
-64
-27 (1)
-4 6
-112 (26)
40k m
Zebra 46
-6 5(38) (0 )
(12)
0 (0)
-2 25 -7
(-8)
-126
)
(1 61 )
5 (-6)
(-11) -22
(28
-73 (0) 5.5km, 3km
15 6 (2 3)
(70) 190 -4 5 (-1 2) -1 -26 8 (-3 )
(-0) 27
77 (134) 58 (143)
297(90)
-47 (-5) -22 (-5)
-84 (-7)
(-13)
-47
(93)
955 (-12)
-58
(-21) -23
-20
(-0) -67
05 -1
811 (32)
-134 (-12)
1 87
(-4) -2
(9) -97
57) 1 (-71 (13) -97
(-1)
-27
-64 (-13)
(-4)
-56 (55)
-659
km
58
.2 3
-9 (-1)
-4 (-1)
78 (-1)
33.4 km Panther
km
(8 )
47
71 (3)
54.9 km se oo inM Tw oose inM Tw
97km
84km
(0)
467 (27) 0 he r
b Ze
ra
-41 (27)
-53 (-5 )
Pa nt
35 km
.3 45
-78 (2)
40.49 km Zebra
14.5 km LARK
-71
(-5)
119.2 km LARK
-357 53 km Tw in Moose (-6) 35 (-1 0 72 )
-58
(-18)
km 22 16 (10)
59.63 km Panther
53 (7) -22(2)
87km LARK ra Ze b
154 (1) Chanditala0.96 0.95 ) 0.95 -4 (-21 her -40 4 (21) Pant -10 6 km (-3) (-3) 10 6 Jayashree 3 (3) 0.95
Ashoknagar
he r
27 -48 (8) .6 6 km pa nth er
r the pa n
Basirhat 0.91
(-4)
Rishra
ra ze b
km 70
Bighati 0.96
1) -63(-1 -164 15 km (-19) pa nt
270 (50)
km
km
362 (-1)
0.99 0.97 0.95
40
71
)
Jeerat
(-6)
46km Panther
2
(-2 4
(-14)
35km Panther
km
2X300MW
(-15)
m Tw inm oos e
Bongaon
-80
) (-3
34
552
-44
KLY 0.94
Dharam 13 pur 6(3 7) 0.97 0.94 -9 (-20)
Ze bra
33 (8)
90
(172) HNIZ 0.95
-32 (-10) (-5)
m
9 -10 1) (-4
12 0 (2)
MCCPT 87 (56) ZZCP0 Tatapower 2X45 MW 0.97 1X30MW
7 8k
th er (0 ) ) Pan (0 m 0 km 15 0 .1 k 11
km
)
1.01
0.95
4)
her
-90
-30 73km Zebra
Domjur 0.96 0.95 ) (6 0 -2
Falta 9(4 0.92 -4
-1 (-0)
56 (1
26km Pant
7
-51(-3)
Belmuri DVC
(0)
8 (3)
32km
22km
-137(-38 )
-24
87km Panther
km
0
-2
.2
r 36km Panthe Panther 19.5 km
1)
35
Jangipara 0.95
) (-8
Haldia 0.96
0.96 -56 (-15)
16 3k
her Pa nt
0 (0)
Pan 4 (th er7)
(-20)
8km
km
-62
Bongaon 0.93
Zebra 58 km
18
)
0(0) 175 (4
(0
(-1)
39 km
66 8) 7 -6 7) (1 (-1
Adisapthagram 0.95 -15 (-9)
-3 0
Ze br a
) 10 0(-6
km
er nth Pa
r the pa n
46
km
km
-176
53
.4 33
km
7) (-1 25
(-35)
(5) -102
18
249(40 )
)
7) (-1
er nth Pa
(-22)
(0
m
249 (40 ) -104(-22)
-41 (-5)
210 (28) 0
4X60MW 1X210 MW
m Tw
-8 (-14)
BTPS
322 ) (210
-157 (-7)
-0
-104
r
a
5 5k
Ranaghat 0.93 Khanyan 0.96
km
55km
-13(10)
6 (1)
Khanyan
18
a Zebr M oose in
Tamluk_R 0.94
Behrampur
Satgachia
0 25 (-1 7) (-14 )
br Ze
her Pant
er
53.5km Zebra
he nt
Kalna 0.95
km
42km
nth Pa
136k
9)
-50 (-11)
(1
103
Pa
a
(23)
r he nt Pa
(24)
km
-42 (-3) -0 (2 0)
Zebr
78
) -3-23(17 (1 6 8)
4 (-0)
se oo inM Tw
46
-60 (0)
) (3
-2 8
52km
(-3 )
Sagardighi Bakreswar
Belmuri DVC 0.93
km
156(2 3)
km
(-41) (9) 8
0 20
)
a br
(21
Ze
-37
61
km
-104
5 (2)
5
her 45 km Pant
Krishnagar 0.96 0.94 (16) 28
33
29
-3
Pa
49 (10 )
0.93 )
Dhatri T 0.95 -4 (-0)
46
m
-28
er
13km
10
(-5)
2 24
(-27)
HPCL 0.96
BAJKUL 0.94 50 (13)
10 (4)
-121 (-7)
32 -49 km (-1 103 Pa 0) nth
(-1)
Arambag
21km er
2) (1
.1 k
m
er nth
-10 ) (-1
km
)
59 (18)
(8
Belmuri 0.95 -28 (29)
0
50
k 65
Pa
.3 47
0 (-2
bra
3)
13
km Ze
(10 497
6) (-2
-2
89.89
se oo
Zebra
inm Tw
71km
Tamluk 0.94
EAST MEDINIPUR
(24)
(0) 40
0
Debagram TSS 0.93
18.75km
m .5k 51
) (0
bra
Pant her
km 73
(6)
-183 ) -272(4
0.96
Egra
km Ze
a br Ze
) (-6
6X210 MW
-15 (-5)
0.97 / 0.95
53.5
(-1)
29
P
New Haldia
23
Baripada
se inmoo km Tw
(-6 6) -191
-381 (-51)
m ) m (-6 16k) -7 2 6 (-3 -3
se oo M
BEL CPP 0.94
4 36
2k
-54 Pingla (-18) 0.95
-22
(-16)
1.00 0.97 147(88) 0.95
(11)
BEL CPP
Nazirpur 0.92 30
(2)
-3 (-0) -3 (-1) 6k m Debagram
13
in
)
Tw
Amtala 0.92 -30
HOWRAH HOWRAH
nth ) Kolaghat e r (3 Pa th 0.95 36 an km
19
98
km
161.5km TwinMoose
Egra
114 (15)
91km TwinMoose
32 (4)
)
4 (-0) km Kolaghart T .3 57 0.93 Bagnan Uluberia 0.94 34 -49 0.95
2
KTPS
(-4)
-5 (-1
(-2) Cossim Bazar TSS 0.94
2 (3)
r ) 14 nthe 5(a -6 m P k
km
2
.7
-148
41km
-3
KTPS
(0)
e os
147 (88)
o inm Tw
91 km TwinMoose
m
22
-22 (-1)
(0)
4 -2 ) (-3
Tarakeswar 0.95
-1
(4)
Balichak 0.95 -13
35 (5)
Kharagpur
Hizlee
-80 (-26)
her
5
69.2km
WEST MEDINIPUR
-0 ) (-0
0 (0) Satgachia 0.96 0.95
-157(-7) 73km Zebra -96 (8) -3 07 34 km 94 (-4 (-9) 4) Pant
Kolaghat (DVC) 0.93
48 km
47 (10)
) 34 2 (-8
-2 (-1)
19km
1 BRG Steel (0) 0.97 (0)
-251 (-28)
Kolghat DVC
0
-251 (-28)
Chaibasa
8 -5 4) (-1
98km TwinMoose
km
-157 (28)
25.5
Baripada
0.95
Pingla
3k
69.2km
0.94 0
Birsingha 0.95
Jhargram
Pan ther
0.98
0.94
TwinM oos e
Midnapur 41km
0
Pa nt her
-3 (-6)
Burdwan
78km
6km
-9(-5) 9 (5)
-32 5 km (-10) 24 (8) -5 (2) 95.2 km Panther 5 (-2) 0.93 -1 -1 (-0) -34 (4) -39 (-14) -30 (-0) 0.97 (-5) BRG Steel -17 61 61 (0) 90k Tap 32 m (11) (11) .5 k m Vidysagar Z -61 e bra 33(2) Park (-1 0.98 ) (0) (2) 29 18 -61 0.97 (-1) Hizlee (-1) Kharagpur TSS 1.01 -148 0.99 (11) (-2) 0.99 0 -11 (0)
1.00 0.98 0.96
her Pa nt
-2 (4 10 ) 24 (10)
(-5)
) -65 1) (-2
-15
0.95
109(1)
54 km
(0)
-18 (-6)
Arambag
CK Road 0.94
-1 (4)
Balichak
(-3 )
(0
0.96
WBIIDC
26km Panther
-32
0
TM Bulk
) (11
-36 (-5)
48 (16 ) Mahachanda 0.97
Pant he r
0
331 (15)
46km
-15 (-5)
0.96
th er Pan
82
RM Bulk
Ze br a
-48 (-19) 88 km
48 km panther
-2 (-1)
) 50(2
-1 -47 (-7) (4) 39 (15)
km
CK Road_R 0.94 -2 (-2)
0 (0)
Jhargram
49
46 (-6 252 ) (176)
arambag
CK Road
16
(0) -1 (-0) OCL 1 0.97 (0)
1 (0)
-48 (4)
Jamshedpur
0 (-15) (0) 0
BANKURA
111. 5km TwinMoose
OCL
-16 (-6 )
Bishnupur Old 0.97
48km Panther
m Tw
oose inM
r nthe m Pa
-57
43km
Raina 0.93
(0)
k 177
66 .5k
Behrampur
-5
35km
(-35) Katwa 0.93
Bolpur TS (4) 0.94
2
-46(19)
0
(5)
(2)
Khatra 0.97
Chandil
22
se
-2 7 (3 ) 27
New Bishnupur 0.98 0.98
64 (3)
Katwa TSS 0.93
r
m
e nth pa
8k
km
16
er
18km Panth er
ose
e
nth km Pa
20 (5) SonarLal 0.95
(-3) 1.02 -2 0 -362(-6) 345 (34) -92 Behrampur (4) 0.94
Mo Twin
s oo
134 (-9)
er nth Pa
Mankar 0.97 -4 9 (1 9)
98 (-10 ) Pa nth er
Muchipara (Durgapur) 0.99
-10 (-4)
-2
RK km LA 69.22
M
30 km
(-80)
-58
-70 (-7)
(-4)
km
in Tw
m Tw inM oo
27
2)
m
Bangladesh Bheramra
Lalgola 0.94 -30 (-16)
2.4km
Bidhannagar 1.01 0.98 0.98
2 5 9 14) (1
-19 9
0.99
2) 5 (-
(9 )
11 5
km
1
107 (-5)
se 21 0k
km
16
oo M in Tw
(-8)
bra Ze
bra
-1 00
213 (-18
-20 (1)
m
36.2 km Panther
-12
(0)
Sadaipur
Bolpur 0.94 ) (-4 0 -2 (-4) 12
Pa nth er
-20 Barjora (-2) 0.97
-4
1
k 05
Ze
0.99
nther
km
52 (2) Sonic TD
Bankura 0.97 4 (12)
m
k 71
0 (0) 10km
0 (0)
m Pa
4X225 MW
se inMoo km Tw
0
Zebra
(-2 )
1.02 1.00
10km
31.5km
Barjora DVC 1.00 0.99
.5k
) 20 (3
1 .8
-134 (15)
133 (14)
54 (4)
-253 (48)
3 34 ) 6 (7
Mejia
183.5 13
-22(2)
-48 (-14)
) 1.03 05 (1 1.00 2X500MW
17km
B AB 0.95 0.95 0.95 0.95
(-9)
44.5k
(1)
Bmn
IPP
a
Parulia
26 8( ) -9 18 -11 4(-5 -8(6) (8) )
) Waria DVC DPL 0.99 50 (-4A1 0.98 0.95 0.98 4-29 0.95
)
1X110 MW 1X300 MW 0.95 1X250 MW 3X75 MW
-155 (37)
2)
Ze br
11
Ze br a
(-2
5 (1
km 0
0 (0)
4X210MW 2X250MW
km
10
11
2
ra Zeb
) (0
-18
.6
42km
) (-5
129 (-64)
20 (1)
(48) 20
59
m
11 4k m
6) -3 6 (-1
0.97
m
22
-79 (62)
(1)
-13 -36 (-14)ASP
1
-4 ) (-1
PPSP 1.02 -5
5k
(-6) -65 -17 (10 15.9 km Panther Hura ) (-3) 0.99 Purulia DVC 0.99 0.96
-4 (4)
69km Panther
73km
(-8 3)
ZZCP0
1X140 MW 1X210 MW
-8
Bagmundi 0.98
Purulia 0.98 0 (0)
14
1.03
64 (1) -8 5
5 1) (5 8 19 ) 5 (1
Ranchi
-44 (-14)
16 1 (19 )
.49km
2X500 MW
935 (0)
DSTPS
14 .7 5k
Ukhra 0.97
km
m 22k
) (55 ) (52 260
1 26
5) 3 (1 -16
STPS 0.99 0.99
Tamla (-9) 1.00 40
-271 (42)
) (-24
7
85 (83 ) 1
1.00 -31
270 (36) ) (265 70.5km Twin Moose -2 62 (23) -262 60 km LARK 0 (0) 89.89 km Zebra -61 (-15) -37 (-2) 13 62 km Zebra -1 Ramkanali (2) 09 0.97 (11 -23 Raghunathpur ) (-5) -5 0.99 5 (0)
STPS Moose Quad 155 km e Moos Tw in 16 9 km
Parulia (DVC)
8) (-2
km
40
1.03
Bidhannagar
PURULIYA -4 (-4)
km
2X250 MW -20 -20 (2) (2)
70.7km Twinm oose
Asansol
) (-45
114 km Zebra
62 km Zebra
Raghunathpur 4X120 MW (DVC)
-73 4) (-2
(20)
Crescent 0.97
CTPS-A1
38
ZZCP0
3) (4
2X600 MW
9 (-5) 2X20 MW
37
20 km
6
Panchet
-71 (-5)
37 -37
146
(-15) ) Z 13 km 8(-5 e r th Kuli an ) 0.94 (13 k m P 7 0 5 2
147 6
0.99 0.99 7) (-2
er
1.01 0.99 0.96 ebra
-24 (-3)
Bakreswar 6 -3
CTPS-B1
0.98
-5
0.98 0.97
0.95
JK Nagar
36 (12)
Asansol
33 km Panther
Jamuria
Panth
Gokarna-52 (-7)
35.6km
24(4)
48 -2
CTPS-B1
-1 (-1)
Waria (DVC)
27 (1
63k m
2X300 MW
27km
-497
1.02 1.00
75
-44 ) (-15
) (-2
-111 (-4) 96 (-5)
58.23 km
Sainthia 0.93
48
0.99
Mejia
1 (-10)
m in Tw
r
0.99
m
nth e
71(-3)
Burnpur IICSO
Maithan
39.7 km LARK
1k
5X210 MW
-26
(20)
)
(12 )
(51)
(-29)
(8
281
24
44
(-22)
46.8km 67km Panthe Pant r her 47.2km Panther
km 22
(0)
Raghunath gunj 0 (0) 0.93
Sagardighi -58
-4 (-1)
(1
)
(-3) (-2 ) m 6k
er nth Pa
er nth Pa
(0)
km 38
-347 (-9) 36 2.6
22 km -10
-10
(-3) Ambuja Tap 0.98
0
94.6 km TwinMoose
67km Twi nmoose
-365 (-31)
35
(-1 43 2) 4 0 (-8 k m T )
4
) (7 150 km TwinMoose
-4
FKK-s 0.99 Ambuja 0.98
1.5km
0
Pa
Kalipahari 0.96
17
se oo
MALDA 0.99
-95 (-42) 1) (1
3
win
556 (86) 957 (19 9)
9
-78 (-19)
6
7km
(-29Panthe r )
Khejuria 0.99
-67
Rampurhat 0.92 51 (6)
er th an P
km
-7 (-2) -282 (8)
-26 (-2)
0) (-1
-7
a br Ze
-26 (5)
Dhulian 0.98
Kalyaneshwari
(-6)
0
) (-4
km
1.02 1.02
10
-7
-3
79
-29 (4)
Farakka
47 (8)
Balurghat (4) 0.96 -26
95
er nth Pa
km
km
3X500 MW
LALMAT IYA
-23
1.02 -95 (-9) 1.01 0.99
3X200 MW
11 (13)
-1
28 (4)
55
Malda PG
Kalyaneshwari
-28 (-1) 98.4 km panther Balurghat_Tap 0.99
26
) (6
e os Mo
(1 )
(-1 )
-67
pa nth er
2
(13 )
2 (10
4) (11
79
Gangarampur 0.96
62
Khlgaon split
(-17) -40 (-1 )
Raiganj 0.99
-44 (-15)
ZZGP0 400 kV S.S 220 kV S.S 132 kV S.S 400 kV Line 220 kV Line 132 kV Line Load Thermal Generation Hydro Generation IPP CGP
IPP ZZCP0
Display Notation Injection into the bus : +ve Drawl away from the bus : -ve Voltage Mag/(Ang) in Pu /degree Flows in MW and (Mvar)
Power Research and Development Consultants Pvt. Ltd.
Eastern Regional Power Committee West Bengal state existing network (May-17) geographical map
14, Golf Club Road, Tollygunge, Kolkata, West Bengal 700033
#5, 11th Cross, 2nd Stage,W OC Road, Bangalore-560 086, INDIA. Tel : +91-080-23192159,23192168, E-mail :
[email protected]
15.09.2017 APPROVED
REVIEWED
CHECKED
DRAWN
DESCRIPTION
REV.
DATE
REMARKS
LOA details: ERPC/PR_DBASE/2016/3567 Dated 30 March 2016
MiP-PSCT TM
DWG. NO. : Geographical Power Map\ER\May-2017\West Bengal
10 Tw 0 km in Mo os e
194.06 (47.96)
(-13 .77 )
3)
8.0 (2
(-16.98)
km 24 .5
0 -43 .8
274.06
85.14
a
(0.95)
-42.31 (-8.83) -90.32 (-10.03)
(2.43)
335.00
(16.96)
662.00
Zebra 11.15Km
-3 33 .3 5 (3 0 .66)
(0.00)
Moo se in
m Tw 8.5K
160.09 (48.90)
33 3 (-2 .1 7 7.8 0)
0.00 (0.00) .80 -2747.58) (-2
Moo se
-1.49 (-0.48)
35 (-6 2.1 7.3 9 0)
se
489. 15 (-9 8.2 0) 25
Km
18
Tw in
Km
Tw in
Km Tw
in M
Moo se
oo se
Moo 30 Km (47. 70) Tw in
-65 8.7 7
68
Zebra
3.66
(38.23)
204.70
m 3k
9 (7 -48 .68) 9 (99 .97 -3 .19 52 ) (74 .78 .8 0 ) 13
3.3 Km
-47.97
(-15.39)
4
(0.00)
15k
1
2)
6.3 -1 Pa K n th m er
16 .26 .7 0) 19. 95 (4
-14.22 (-4.21)
0.00 (0.0
23.6 Km
94.47 (2.80)
-72.00 (-11.64)
Ranasinghpur 0.96 -22. 18 (-0 .67) 62 Km
Pant m her
0)
Kesura 22.05 (1.59)
Km
-250.00
260.80(28.36)
-50. (6 32 .0 3) ACCC Casaba lanca
27 3
Km
Km 14 0
(-27.97)
7.2 6
Km
-96.60 (-6.73)
Moose Twin
Km
31. 124
7.2 6
Km P Tw an th in er Tw M in oo M se oo se
36 .5
0 (0.0 0)
(40.26) 0.0
287.98 (-8.34)
.5 36
0.00 (0.00)
(-3 .8
(-3 .4 0 )
(0.77)
-289.63
8 (-2 .86 1.6 3) 4 34 .0
(-0.77)
68.57km Panther
-68.99
0.00 (0.00) 0.00 (0.00)
(-36.66)
0.00 (0.00) Panther
40 Km
moos e Twin Km 190
ose 295 Km
Twin mo
26.36
Km
Pant her Panth er
Arugul Tap 0.00 0.00 (0.00) 0.00 (0.00)
Argul 14km
0.00
0.99
Panther (0.00)
0.60
(-0.39)
-1.20 (0.80) 48
-0.60 (1.37)
0.92
0.0 (0 .0 0 .8 0 (- 0) 6.6
Atri
5)
Nimapara
Shamuka
-16.62 (5.31) 0.00 (0.00) 0.00 (0.00)
97 Km
Twin moo se
(-1.16)
-3.56
-94.00
0.98
-15.00
Balugaon T
0.00
(-0.00) nther 5km Pa 0 -0 .0 2)
Chandpur
(-0.85)
er th an ,P Km
0.99
Narendrapur
Panther
0.00 (0.00)
-37.84 (-15.79)
-115.00
0.00 (0.00)
2 X 125 MW + 1X13 MW
174.60 (17.45)
CG P
(-38.66)
(-2.41)
LEGEND
Jajpur town
GENERATION
-30.75 (-1.99)
Maithan ispat 0.99
HYDRO 3 X 25 MW CGP
THERMAL
SUB STATION Jakhapura traction
765 kV
0.98
13.2 Km
Panther
THERMAL-CGP
CGP
CG P
.72
(-25 .27 )
THERMAL-IPP
IPP
1 X 30 MW
12.80 (7.28)
HYDRO-IPP
IPP
(27.69)
16.00 (7.87) 11 4
Km
Zebr a
400 kV 220 kV
(39.77 )
193.1
HVDC
.77
0
0
)
0 .0
(0
6.0
(105
58
Mendhasal
TRANSMISSION LINE
2
) .00
(36 .79
132 kV
0.00 (0.00)
(1.99)
-196
64.20
0.99 -64.20
Zebr a
0.00 (-5.28)
Zebra
Rohit ferro tech ltd
32km Panther
-0.00 (6.75)
0.99
-16.00 (-7.87)
-7.35
Panther
-414.35 (40.66)
se Twin moo
k Zeb m ra
-196
(-0.67)
5.81 (1.61)
er
0.00
r
nth Km Pa -5.81
30km Pan the
20.31
(-0.00)
-0.00 Km 5.5
Ze bra
4K m
Ze b ra
0.99
99 -58. ) (33.45
Km
a Zebr
10.55 Km
Zeb ra
27.29(37 .68)
0.98 54.58 (12.80)
29.34 Km
0.00 (0.00)
Jajpur road
(-22.37)
(-0.20) 19.85 8 Km Panther
(0.52) -19.88
0.98 0.00 (0.00)
80km Panther 0.00
-9.92
(-0.49)
7. (-1 18 3.7 7)
-9.92
16.58 (-2.56)
3
(- 3. 67)
-16.04 (-7.32)
er
0.99
-65.42 (-10.28)
115.14 (19.78)
Phulnakara
-2.00 (-8.09)
BPPL
35.6km Panther
1.00 0.00
)
Gazuwakka
nth Pa
23.45 Km Panther
-4.49 (-1.27) ther
Jindal steel
4.78
58.97 ) 22 (-3 2.
3.20 (-1.8 0)
Pandiabil
11.87 4) (2.8
(9.22)
Visa steel
-3.20 (2.4 10 Km 7)
-99.41
90.21 (10.09)
-54.31
338.55 (14.32) 71) (48. -22.58 (15.56) 9.60 39.36 (0.00) 24Km 22.54 -39.71 Panther(7.27) (-10.73) (-6.84) -85.98 154Km Zebr
km 70
-28.50
(-6.82)
-3 3 9 .9
-14.22 (-4.21)
22 Km
(-0.00)
-0.00
(-29.88)
37.12 Km
5K m
0.00 (0.0 0)
2.3
Km
-45.36 (1.78)
29.7
Pan ther
-17.73
(-0.89)
-2.33
6.0 Km 5
.72
(-8.03)
-34.30
-26.98 (-8.93)
(0.0
0.00
0)
0.00 (0.00)
0.00
27 km
(-15.40)
(26.26)
34.20
(0.23)
Pa nth er
34 .8 km
-16.54
(-4.57)
.5 km
32
Tw in Moo se Tw in M oose Km, Twin Moos e
190 Km
295
273 Km
-7.32
(-2 .56 )
(0.00)
6.80
-74.70
68.5 7 Km
Pa nth er
0.00 (0.00) 18km, Panther
0.00 (0.00)
54 .1
Pa 9 K nth m er -2.33
ther Pan Km 86
Pa n 15 the Km r
0.00 (0.00)
(0.00)
0.00
-207.12
7.18
-72. 25 (1 9.
41.64 (-6.92) -4 7 .60 (-9 .34 )
(-4.10)
-17.65
Ze bra
(-23.39)
-75.90 ) (-9.75
253.73 (49.38)
-6 .5 0
Panthe r 72.46km
Zeb9 ra
-6 4 .5
m 1k
Panther
(0.92)
-33.36
-35.96
(38.23)
2.26 2.8km
85.14 Zebra
154 km
223.88 (40.18)
29.5 km Zebra
Zebra
70 Km
0) 4.8 (7
(-0.49)
(-0.00)
-0.00
-14.55 (5.16)
8)
-2 .4 (-7 .47 0 )
(-2 .4
-224.70
(52.38)
Twin Moose
171 km
-15.00
(-3.93) (-1.09)
-5.05
km 34.68
-16.61 (0.00) 8 9 (7 -339 (9 .6 .99 9 .1 .9 7 8) 9)
-4
(0 .0 0)
0.00
45.9 Km, Zebra
-23.76
(-5.34)
-32.75
120 km, Zebra
5.8
-4.60
(-0.30)
0.00 (0.00)
4.32 (7.0 8)
-4.3 2 (-7.0 8)
-8.31
(-1.24)
6) (4.5
Ze br a
(-2.02)
-12
116.5
154.00
0.00
Zebra
(-2.82)
.29 )
0.00 (0.00)
0.00 (0.00)
(-2.19)
20 Km
Panther
(-2.22)
-6.45
(0.00) 56.7 7(5 .10)
77.10
(47.26)
-55.49 (0.50) 53.31 (-21.58)
-44.00
(-14.64) -55.33 (20.01) -12.00 9.
7K (-0.55) m 0.02 (0.55) 0.00
-0.02
(-2.19)
2 41 9 .1 -7 2.48) (6
72.12(-5.0 7)130 Km,
3.5
-1.20 24.76 km (-46.14) Zebra
1.5
33) (1 8.
.2 (0
(-12.35)
-17.44
(2.39) 17.33
0.98 -11.89 ) Km .5 .32 11 (-2
Nayagarh
Balasore
91
1.99
Pan
Bhubaneswar
ther 63km Pan
-10
01 )
145 km Twin -11 6.7 Moos 6 e (7 1.96) 18 2 km Tw 131 in km Moo Tw se in Moo se
0.07 (4.21)
8 (91.73 )
.70 (-0.6 2)
25.7 (9.5 0 5)
0
(-18.07)
35km Pant her
-60.02
9)
-11 .1
-68.66
Zebra
a 0. 7
km
-3.42
(-0.57)
(1.64)
5.00
36 Km Panther
-5.01 (1.25)
-0.00
(-1.65)
115 km
102 km Zebr
(1.06) -6.40 Ze bra km 13 4
Panthe r 3 Km
51.85 (-10.0 3) 33.
53.78 (-1.67) .77 -27 6) .7 (-5
8.25
-5.00
(-1.64)
15.03
(1.17)
37
Pa Km nth er
(-0.63)
-5.00
(-0.00)
Panther 54.6
Km
26 7 (-4.2 .25 2)
-3 9. (-7 76 .81 ) -5.00
39 (26 .93 .48 ) 0.54 km
46.17 (-0.16)-34.80 (-22.47) Pan Km ther
-47.01 (0.43) 43
0.00 (0.00)
-24.70
-649.00
(-219.44)
55 453. .05) (170 65 8.1 8 (-13
(-4.08) 20.49 (-3.52)
Tw in
km 28 8
-0.69 (-0.22)
8.93 (65 .35 ) -2
1)
Tw 68 .2 in M 2 (3 oos 2.8 e
km 72
-6.50
(-0.70) (-0.00)
Quad Mooose
68 Km
10.8 Km
2)
-25.08
(-7 .5
-20.45
Panther
39.8km
-52.97 (9.30) M
oo se
(-1.07)
-11.7 5
.39 -16 07 ) (-4. 0.00
-54.42 (-24.48)
3.38 (17.71)
6.39 (13.57) 30 km Zebra 1.57
(0.78)
60km
22 23.41 23km .8 (-2.30)(- 6 (3.56) er 6.3 Panth 9) -0.00 (-0.00)
57.3 3k Pant m her
.2 6 )
(-6.30)
Zebr a
(-13.24)
117k m
-32.18
32 .2 9 (-0 .1 8 )
52km Panther
42 .228.2 3594 090 0+0Z + ZZ L ZLP4 Q 302 43 71 02 1-4 71 30 1-4 21 30 43(2 21 ) 43 (2 )
-32.91 (1.68) (2 .9 0) m
Pa 3 Km nth er
3k
-60.57
(7.76)
11.63
(4.22)
nther km Pa 72.28
-16.20
(-4.85)
5 16.2 ) (5.89
)
92.0 7 km 93.4 Ze b 6 km ra Zebr a
(-4 .0
46.00 (22.29)
5.01 (0.25 )
18.86
10km Pant her
(0.00)
0.00
-12. (1 04 .6 9)
the -37.20 r 5k (0 m(-13.39)
12.66 km
5k
-4 5 (1 .94 1 .7 9) 9 (15 .2 8)
-19.00
(-24.81)
-53.05
-4 (1 5 .9 1 .7 4 9) -55 .3
(-6.39)
0.00 (0.00)
0.00 m Pa n
60km
Panther
-5.02 (2.89)
-22.91 Panther (6.78)
22.86
//49.5km Panther
10km
-3.76
-0.20
(-0.07)
(-3 8.8 5)
-20 8.1 (-1 1 7.13
3(-8.4 5)
.55 93 5 ) .3 (10
(5 .82
5)
Khurda
18km Panther
bra Ze
Km
7. 9
a Zebr
Kaipadar
30.95 (11.14)
99.39
-6 8.
9)
bra Ze
8
Bhadrak
6 .9 60
7) (9.2
Atri
Bhanjanagar
87.26 (1.56)
12.54 Km Panther
Km
5 8 .0 -8 .55) (3 .15 -31 2 ) (6 .7
-30.75 4.752 Km 30.75
se oo M
1.12 (49.44)
a
in Tw
To upper Sileru
0.00 (0.00)
-2
)
a br Ze
Km
r
br K m Ze
.59 -9 3 1) .8 (-8
-134.95 (-9.14)
m 5k 22
Atri
4)
(-1.36)
6 X 60+2 X 75 MW
Samangra
70
5 4 .9 -13 .14) (-9
1.00/ 0.99
Vizag
.9
13
bra Ze
(-9.94) (9
ra
b 1 Ze 2 .3 -7 1.62) 69 Km (-1 68.
.22
a br
-1.99
5.5 Km
10
Pant he
Tata steel
Duburi new
(-1.94)
0.98
-134.89
(-2.97)
Padwa traction
MESCO
r nt he
9 4.8 13
.29
.7 71
.3 (10 .61
(19
5 (-2
) .74
Ze
0.99
Panther -11 5.51 (-20.10) 65.00 (9.80)
46km
0.99/ 0.98 0.99
3.56 (1.16) 0.00 (0.00)
0.99
-9.92
Duburi
er
148.33(34.95)
Jabmayee ferro alloys
Pa
-3.23 (0.00) 0.00 -54.78 (-12.00)
64.69 (4.19)
0.98 -3.56 (-0.85)
15) (-8.
-65.02 8 Km (-4.57) Panther
6.4
20 Km
Panther
(-16.77)
Kolar
67.64 (5.43)
BRPL
0.98 -3.23 (-0.82) 3.23 (-3.07) Km -10.92 (0.82) 10 (-0.38)
nth Pa
-69.62 (-7.82) 45km Panther 95.6 km Zebra -149.89
MSL
CGP
Km
90km
-34
2 X 19.25 MW + 1 X 24 MW
Km
.28 69
b ra Ze
1 4 .60.80) (52) (-1.
42.70 (16.72)
km 66
20 Km Panther
Kamakhyanagar TTPS Meramundali B
0 (0.0 .0 0 0)
5 13
Meramundali
-14.40
1.03
0.98
Nilanchal
2.83 (3.74)
0.95
Km ca lan ba asa
0.99
1.00
Panther
Nuapatna
0.99
5.5
HAL
37.04 (13.95)
37.12km
-4
0.99
Mo os e
Cuttack
BBSR splt
1.98
-91.00 38.25 (3.65) (-30.78)
(-10.99)
Nuapatna Tap
0.98
-2.83 (-13.70) (-2.98) 10.91 (3.25)
Pandiabil
Chandaka splt
C CC
-8.23 (-4.22)
-36.89
1.00/ 0.99/
-39.86
7
AC
0.93
.4 0) 8 .0 -3
er
Paralakhemundi
(0
Chandaka 20km
er Panth
37.62 (13.57) -37.62 (-13.57)
Tomaka Traction
(-0.00)
0
th Pan
0.96 -27.81
0.0
(-13.31)
Mendhasal
0.00
Tw in
71.3 Bidanasi 4 (4.95 ) Dhenkanal
Bidanasi
Arati steels
-37.93
Km
Kalarangi
km Pa nther
Meramundali
28 km
Baripada
1.00
Balimela
-36.00 (-10.12)
0.98
11.86
Mo ose
MENDHASAL
BC Mohanty traction -0.00
Tw in
.16)
35
0.00
nth e
-9.93 r (0.11 )
oose
traction
9.92 Km (0.49) Pa
M Twin
5.00 3) (0.6 Machhkund road
0.00 (0.00)
Km
MALKANGIRI
326.02 (0.00)
er nth Pa
1.03
45
0.2km Zebra
Balimela PH
50 Km
Panther
12 .79 4
m
Maheshwari
0.00 -9 (0.00) (2 .0 2 2 .6 2)
Anandpur
0.98
r (0.00) Panthe
3.42 (0.57)
)
8
-28 (0 9.63 .7 7 )106 K
(-1.49)
(0.58)
0.00 (0.00)
Aditya AL
0
106 Km
0.00 ) (0.00
(-4.91)
(-1.76
(-7.09)
0.00 (0.00)
-5.8
Konark
e Twin Moos
1.03
(0.00) 3 X 17 MW +3 X 21.25 MW
Panth er
Jagannathpur traction
0.00 (0.00)
-43.41 (30.50)
0.00
13 Km
0.96 / 0.95 -6.05
43 .0 1
Mendhasal
TISCO Bamanipal
ther P an
Machhkund 23.55
1.02
er
0.99 -23.60
Narendrapur 0.94
F
.32k m
Pant her
CGP
1 X 33 MW+ 1 X 77 MW+ 2 X 150 MW
Arati
Y BA DUBURI
Chattrapur
IREL
er th
0.00
Damanjodi
Sunabeda
40 Km
O
5 17 .70.94) (-3.57
-33.73 (-13.83)
)
Km
1
1.01
(6.25)
BRG steel
Meramundali 1.01 1.01 / 1.01/ 1.01 -12.50 74.16(17.48) -74.95(-8.38) 3.55 Km Duburi -12.50 (-5.63) 74.16(17.48) 113.81 -74.95 (-8.38) Panther (-5.46) 95.6 Km Zebra (54.86) 45 .7 97 Km Twin Moose 412.82 -414.35 (-22. 5 (51.55) (40.66) 0.00 Kharagprasad 5 Km 52 ) New Duburi (0.00) Panthe r 0.00 switching station -12. 24 15.66 0.94 Navchrome (0.00) (151 2 Km 50.94 -1.49 4km 1.49 (31.20) Bhuvi .83 0.94 (9.19) ) -7 (-0.16) Panther (0.48) 0.94 -0.00 (- .4 6.7 -54.64 -54.64 8 -0 (0.02) 1.77 0 81.76 Km 5 Km (9.11 ) (9.11 ) (0 .01 Pa ) -7.40 .0 (32.44)Hind metals nth 9) CG P (-1.82) er 0.94 1 X 30 MW + Meramundali (-30.50) 1 X 65 MW -15.66 traction 0.01 -11.87(-4.10) -0.01 7.47 KmPanther 0.94 (0.30) -7 (-0.30) (-8 3.55 ML Rungta 89.40 .01) Bhushan 1.01 43.7 8 Km 92 (56.32) 1.02
Bhanja Nagar
AL NG E B
)
Jabmaye ferro alloy
(-5.55)
-9.52 (-1.00)
Ganjam
Km
12
6 (1.7
9 (2.1
-174.1
67 (5.4 .64 3)
1.01
Bolangir
Dhenkanal
0.99
0.99
Km
213
(66 173 .07 ose in Mo (33.03)Tw
0.96
Puri
P
Shamuka
0.94
0.94
0.00 (0.00)
(0.00) m9.54 0.00 K er .6 18 anth
CHILIKA LAKE
76 .9
.03
4
2.5
) Upper Kolab
1.02
km
n Pa
Utkal AL
-49.82 (2.22) 1.00 43.42 45 Km (-30.50) Panth
0.94
GAJAPATI
Manbar traction
-10
(1
4 .9
Meenakshi power
2
km
108
(3.25) -50.91
(0) (16.05 .4 77 8) -58. -44.58 (30.08) 240.00 4x80MW (-1.28)
.19
r nthe , Pa 15 km
PPL
0)
Angul
PPT
0.92
100.37 (13.72)
-103.47(-4.80)
-51.64 -6.98 (3.19) (-1.40)
1.01 0.00 (0.00) Km
a 2 br -2 Ze
km
100.37(13.72)
196km Zebra
Solari traction
0.94
-42.85
45.63 (-10.98)
PURI
0.95
ferro
Lakshmipur
.7 er nth Pa
9
6
4 0) (28. 0) 4 5 .3 4.2 20 (15 2.1 10
.5 53
1.01
1.01 / 1.01 0.00 (0.00)
19.74 (4.98)
b ra Ze
Maliguda traction 10.01 (0.40 )
Jayanagar OPTCL
.5
20.00
er Panth
93
53.2km
)
62
km
km
(-2.38)
P Km
) (6 2 .34 9.4 (-1.91) -4.41 -9.40 (-1.13)
th an
4) (-7.43)5.1 0.92 ((1.13) -9.46 4.41 (-0.50) Balugaon -4.41
44
130 km, Twin Moose
) (0.22 -0.00 er
-30.15
0.92
0.00 0) (0 .0 r
0.00 nthe , Pa (0.00) 20 km
Rambha traction
r Pan the
(-1.62)
30
0.92
ra
17
bra -5 Ze
(-5 4.9 8
-0.00 1.01 Km (1.04) 12 r Panthe -2.80 17.86 (-12.99)(12.56)
77.2.2 2 3 km
3 12
b Ze
-103.47(-4.80)
0.00
0.00
7)
Jayanagar traction 28
0.99 / 1.01
5 13
km
.4 (-1 .64
20
Km Pa nth er
Jayanagar PGCIL
KORAPUT 58
-0.00 (-0.00)
1.01
0.95 -10.00
(5.11)
61.4911 Km (6.25) Panther
0.94 1 8 ) -44. .87 (-14
Akhusingh
-27.80 (-8.56) 13.9 Km 105.40
Narendrapur
Chandpur
0.96
JAGATSINGHPUR
IFFCO
5km
er
Ch. Kusumi traction
bra km Ze 70
0.96
-40.91
0.3km 0.00 (0.00) Panther VVC
Rayagada
Km
ther Pan
-1 6.5 .4 3 8)
se oo
IOCL
an m th 7.6 er
-12.01 (-4.23)
11.4
7 Zeb Km ra
oose
nth Pa
1.00
65
(4
Berhampur
km
JK paper
0.94
3.4 11
(0
bra Ze
-83.73 (47.02)
39.81 (-4.70)
m
KHURDA
0 0 .0 .00) (-0
0)
-155.95 (43.06) 86km
INDRAVATI 4 X 150 MW
Digaphandi
-21.4 7 (8.93)
Theruvalli
1.00 / 1.00
th er Pan
91 Km Zebra
1.00 44 2 Km .04.6 (1 0 4) 9 154.3 ) (-27 .62 154.39 ) (-27 .62 (4.30) 50.69 ) .00
// Zebra
, km 46
0 .0 0.0(0
566.00 (-6.50)
38.93 -15.74 (8.57)
RAYAGADA
IMFA
-15 (4 3 5 .95 .0 6 )
16.4 191 Km Pant (-2.99 ) her
.20 ) .36 (-3
Km
Indravati
0.99 / 1.00 59.35 (-12.3 3)
os e
16.49 (0.86)
-12
in Tw
1.00
22
Mo
ther
Pan ther
1.00
0 0) 0.0 (0 .0
in
P an
19 km
Pant her
12.24 (-4.49)
r Panthe
25 9. (1 3. 294 96) km Tw -2
Km
(-0.12)
Km
Purushottampur
km 25
er nth Pa 72.12(-5.07)
Pandiabil
Balugaon T
Pant her
Km 33.96
0.99 -23.15 (-3.7 2)
m 59.4k
er Panth
Indravati PGCIL Pant her
21.17 (-7.13)
24
43 .8 2k m
7) 9.7
6km m Panthe r 6k r a b Ze
(47.7
0.00 (0.00)
(-6.65) 0.96
72.12 (-5.07)
er
er nth Pa 40.7 53 Km
-16.55
55
0 0.0
(4.00)
1.00
(-13.73)
(-4.05)
IPP
) (0.34
Km
-27.00
0.94
0.98
.93 -19 .66) (-2
6 19.6
4) (0.3 .66 19
30
Aska -12 .28
Tentulikhunti
3 X 4 MW+2 X 12.5 MW
0.00 (0 .0 0)
(3
M
th
-45.95 (10.97)
0.00 (0.00)
1 a 9.4 -9
r Panthe
77 -658.
IPP
GMR
er
ther Pan
0.99/ 0.99
(0
0) .00)
0.96 / 0.94 (-6.10) -41.19
56.07 Km
1.01
(-15.13)
th
Smangra
0 0.0 0) (0.0
) 22 km , Ze -0.0 br
0 0.0
K
Nimapara
(- 0. 0 // 00) (00.00 .0
Paradeep
-7.80 (-2.53)
1 X 350 MW
IPP
-49.23
n Pa
Pandiabil
Mohana
62
1.02
oo 12. se 22 (10 222 0.4 Km 0Tw )
in M
(-7.91)
Pan m the 48.80 r
KARADAG ADIA
CHANDPUR
in
Km
3 X 350 MW
1.02
(-296.70)
Sterlite
0.91
4 X 60 MW+2 X 110MW
-113.93 (-52.18)
-884.00
-30.72
3 16.5 th er 1.000.91 Pan (-14.16) -7.81 (6.12) (-1.87) 40.16
-32.20
0.96
998.00 (350.28)
CGP
KENDRAPARA
Jagatsinghpur
er
NALCO
10 X 120 MW
JSPL
8.86km Zebra
Essar
e
(9.27) -68.91
Pa nth
Km
(-2.20)
1.00
NABARANGPUR
(0.00
km 0 22 0 .0
(-2.42) 10.82
GANJAM
km 2 17 b ra Ze
nth Pa
Atri
3)
-45 (65 .76 37 .16) .9 Km Tw
Traction
(0.00) 0.00
-50.32 (6.03)
m
0.99
Vedanta
0.95
4)
CHANDAKA2
.17k
Baki
Km
-74.89 (-25.68)
km
.4 19
a
-10.80
33
KALAHANDI
MENDHASAL
er
.81 82 7) .0 (-3
a Zebr
CGP
Umerkote
22.05 (1.59)
nth Pa
0.96
(-2.53)
km 68.69
Zebr
-0.60 (1.37) (-5.14) 0.99 / 0.99 5 -10.84 68 .8 19.6 km Panther (3.35) 0.00 km
135
(1.09) -19.78 ) .09 8 (1 9.7 -1
59.4 Km Panther
0.96
1.01 /1.01
(-2.54)
(7.86) 54.07
2) (-11.6 -72.31 ) (-1 .52 29 -34.
Bhanjanagar
-6.66
-18.44
Junagarh
(7.86) 54.07
(8.7 .0 5
Km
93 14.
Angul
-2 .94 (-0.68)
CUTTACK
-22.00 (-8.09) Phulnakara Kesura 0.99 0.95 (-7.97)
a Zebr
71.78
-20.86 (7.13 )
9)
Bhawanipatna
.2km
5 .1 35
(5.8
2
20
km .6 35
Km 03 .4 er 37 th
n Pa .48 1 8 4.45 ) (-
(5 .2
20km
1.00 km 22) .28 (1 9. 4.61 ) 69 4 a 34.0 Zebr r (-0.80
33 ) (1 8.
KANDHAMAL
JAJPUR
36
.24 -36 3 8) (-8.
er nth er Pa nth Pa Km
4)
(23.81) (-6.65) (-2.54) Pattamundai 0 .0 -9.15 -103 163.70 0 0.92 (2.42) ICCL (0.0 Kendrapara (88.84) CGP 2 X 54MW + 1 X 30MW km 30.85 Aarti ste els 0.99 0) 0.93 er 19.5 -38.08(-5.28) Mania 14.34 0.99 6) Panth Choudwar -34.91 -31.06 (-2.0 0.98 km 38.08 (5.28) 23km -12.82 2.72 (-3.91) (4.08) Salepur (-1.46) 12km 7.22 -7.30 22.84 Marshgai (-2.81) 0.97 -21.07 (3 PH 12.77 64 .24 .16) (-3.99) Kendrapara -22. 0.93 -3.96 her Rawme t Bidanasi (3.76) traction 29.92 91 ) 0.99 Pant (9.69) (-5.99 3 4 (-2.7 0.99 1.00 -29.80 (-1.44) (0.00) 9) .8 0.99 26 .8 km Km 0.00 7 (-9.03) 56 .12 se Pa (4 .3 (3.01) Ze 31 oo .5 Cuttack -40.00 nth 0) M 31 2 X 55 MW 6 1.001.00 br 4.48 (-10.17) .5 er in a km km Tw (-3.82) pa 14.6 nth 193.12 -65.03 CG P -16.31 er (-8.46) Km (36.79) 1.99 r 5 25.60 he 19.9 Pant (20.00) (9.22) (1.78) Goreknath Km -0.00 -3.85 P 7.2k 23. 5 -2.00
28.00 (25.11)
40.00 (8.18)
43
.6 -18
0.97
29 25. 3 ) .8 (-7
0.91
0.98-30.23
ther P an
60 -2 5. 4) (9.1
P
0.96
1 X 40 MW CG P
34.45 (4.30)
Chandikhol Maheshwari OCL 23 .5 0.98 -7.78 km
Nayagarh
Kesinga
Km r 93 e .5 th 42 an
CG P
-48.81 (-16.62)
34km
-0.69 (0.47)
-51.49 (1.35)
Dhamara
X 12MW
DHENKANAL
IPP
NAYAGARH ther km Pan
m
K
Pan m ther
Dabugaon
-6.512
71.34 -9.02 (22.62)(-20.70) (-2.16)
1 X 50 MW
86.56
0.97 0.69(0.22)
K er .5 14 nth Pa
58.5
POWMEX
Joranda traction
-4.71 m 19.35k (-3.43) -4.72(-2.52) -57.39 0.97
92.320.00 28km km Twin(0.00) Panther Moo se
-54.64 (9.11 ) -54.64 (9.11)
1.00
-6.43 (-0.29)
(9 .0 .04 42
-2.60
(0.6 8)
Dhenkanal
44 0.97 km
Phulbani
Saintala
16
(-1.00)
2.94
0.95
Km
.6 95
8
0.98
0.98
37.12km
-38.07 49.95 (-8.76) Khariar 0.94 (-2.32 )
22.91
2.7
Jajpur town
Dhamara Traction
Kamakhyanagar
TTPS
Chainpal
-0.40 (0.18)
Km
-35
35.7 64 kn .7km Pant her Pa 2.60 nth er (1.00)
Panther
432.00 (137.46)
Km
-174.18 (66.16)
BHADRAK
-2.94 (2.50)
38.76 (4.24 )
45km
-69.62(-7.82)
her Pant
1.00 / 1.01 198 km Twin Moose
3 ) 0.0 .7 4 0 (6
59.40 0.98 (-8.90)
NUAPARA
BOUDH
Angul
(-0.19)
0.00
r th e Pan
-4
0.98
-61.10
MERAMUNDALI
Panther
BOLANGIR
Boudh
(-17.54)
Duburi new se Twin moo
96 Km
0.4 (0 0 .1 9)
0.98
-2.60 Bhadrak 0.98 / 0.98
1.02/ 1.02
35.8 4 (-4.6 8)
1.02 -0.40
Panth er
TTPS
Zeb ra
FCI
CGP
0.99
km 50
0.99
ANGUL
4.91 (1.49)
-4.90 (-1.32)
er nth Pa
23.8K m
Km
Bolangir
ther
173.07 (33.03)
MCL
0
(155.0
DUBURI
Pant her 45km Pant her Kamakhyanagar
-24.76 -4 6) (-2.40) (9.04) 38 (6 5.7 P .5 5 6 42.04 5) anth km .16 ) er -22 CG P (8.73) .87(-3 .9 2) 6 X 135 MW 36.05 27 Angul 9.5 (2 1.01 1 -30.40 75 .98 (-10.15) ) 694.8
(-4.16)
0.98
a Zebr
km
70
(4.24) 38.76
-35. (1 4. 98 11) 70 km
er nth
1.73
0.98
P an Km
-18.40
km
1.01 -39.33
(-3.56 )
km 05
-5.73 8.5km
Facor 23.8
OPCL
a Zebr
Patnagarh
(-5.93)
.16 ) 75 6 -1 18.9 0.60 ) (- -3 .04 0 (1
IRIS
1.01
(-11.02) TTPS
4
-9.60 (-3.26)
Rengali_PH
Bhadrak traction
n er Pa nth m Pa 1k .1 33
7.34 (1.13) -24.12
-7.32 ) (-0.77
54
1.01/ 1.00
1.00 / 0.99 -31.93 (-4.97)
31.53 39.8 Km (6.00)Panther
JSPL
1.00 22 .68 (5.4
m 4.6k
(-14.96) -1.61
-2.50 (-0.06)
Birla tyre s 0.96 -3.66 (-0.23)
52.3
-7.36 (0.97)
51.05 Km Panther
Boinda
km 70 -32.58
.3
IPP
STPS
42. 52
46 Km
Bolangir_PGCIL
Bolangir new
0.97
-4.92 (1.01)
.60 ) 4 0.0 (1
-30
3 (0 .2 8)
4.9
40
(0.00) 0.00
(0.00)
bra a P Ze
87.26 (1.56)
bra Ze
Balasore traction 0.96
3 Km
0)
ER SIM
356 km Twin Moo se
0.99 30.08
0.93
Padampur
272 Km
-45
6)
TSTPS
-2.50 (0.11)
1 .3 0) 60 6.9 (-4
.9 (29 .5 45
-4.2 QUA DB
Sonepur
er
.20 26
5 2.2 -7 1) 9.0 (1
60 -11. 6) (-3.6
.59
Pa nth
.8 (-0
TSTPS 6 X 500 MW
.00 -2503 .81) (-158
.9
Joda
4 X 5 MW
ther P an
Km
7 13
km
MERAMUNDALI
BALASORE
Balasore
er Panth
80
8 16.5
er
0 0 .0 .0 0) (0
b ra Ze
0.97
nth Pa
Km
(223.47) 4 ) -8.9 1.22 JITPL (4 1.02 4) .0 08 (-1
(-2.77)
Anandpur
m .5 k 34
0.99
SONEPUR
1.00 1.01
456.00 (4 .79 )
0.94
6) .1 (3
-1
1
Soro
1668.96
Kaniha-NTPC
IPP
-39.19
(1.30) 29.98
er n th Pa
(-3.35)
6.83
5)
4 .2
2 X 600 MW
0.00 8.5 7k -44.90 (0.00) m (-3.09)
se
(-20.81)
km 24
8
5 kmra Zeb
6k m
-5.30 0.00 (-1.97) (0.00) -73.39 Somnathpur .04 ) (-22.11) (2 0 5 0.99 5.3 30.9 9) .9 -5.29 0.00 (0.00) 8(9 (-1.71) 6.2 -2
(-11.29)
-28.08
9 12 .7 65) (89.
.2 (-1
7.5
Rairakhol
45
1km
Rengali_PGCIL
3 X 24 MW
-11 .7 5
Nuapara
86.93 -35.98 -58.73 (14.11) (8.64)
-49.88 (-21.05)
1.00 / 1.01
0.98
5 X 50 MW
Rengali_PH
Rengali_OS
Barpalli
BARGARH
(19.04)
43.32 0.96 (-3.13)
Balasore alloys 0.96
(6.65)
06 -28. ) (54.35
28.06
-13. 25
Emami paper
Basta
a Zebr
1.00
CG P
7)
0.99
18.56
4)
-13.00
km Zeb ra
(-4 .4
-4.20 (-2.73)
-30.29 (-0.53)
76 .86
.9 (-6
-9.53 (-0.95) 2.34km
0.95
Keonjhar
M oo
0.95
0.98
e Km os 6 Mo 15 in Tw
41 -20.
Jaleswar Jale swar traction
m 34.5K
Chiplima
-4 .2 0 (- 1 .8 1)
1.01 / 1.01
Twin
0.98
Karanjia
KEONJHAR 0 7.4 1 8 49 ) (35.
Baripada
m
CGP
-69.00 (-23.07)
)
m
MAYURBHANJ
14.39
0.97
km
3k
(-1.96)
-7.06
7.01
Keonjhar Traction
100
.31 (29 .25
5k
1 X 20 MW
69
5)
3.56
e os Mo
SAMBALPUR
steels
er n th Pa
-15.47 (-5.06)
Km
-0
.00
(-0.73)
90km Panther
(4.97)
Barkote
-1.58 (-0.64) 16.60 (4.94)
DEOGARH
km 18
Burla
-75.40
2
(10.07) 7 Baragarh 0.9 0.97 4) (1.2-0.97 m 54.19 16.9km 3k (-1.09) (14.33) Panther 0.00 (0.00)
Katapalli
0.99
in Tw
Katapalli ACC 0.97
25.70
CGP
Sambalpur
(-18.39) 50.93 0.386km -51.42(-0.24)15km (0.09) Rairakhol tap Hirakud 44.42 0.99 station 130.57 -9.10 34.8km (2.56) Panther 5 1.00 .4 15 Rathi 3) (4.4
1 X 30 MW
Shyam DRI
1.00 95.72 (17.64)
2 X 49.5 MW+ 3 X 37.5 MW+ 2 X 32 MW
1 X 30 MW 2 22
CG P
20km
57.33km Panther
8.83
Burla
15.00
CGP
-7.6
Km BRA ZE
0.00
1.00
1.00 (4.46)
-14.57 (-4.93) 51
Ind_Bhartath
Hindalco
(-0.92)
0.98
0.97
(17.41)
4) .0 (61 1 .4
0 0.0 ) 0 (0.0 ) .0 0 (-0
0 -0.0
2 X 210 MW
Jharsuguda Tap
(18.83) 1 X 350 MW
(0.00)
0.00 (0.00) Panther
-2
-221.02
.3 Z E 8 km BR A
(12.54)
(-9.31)
CGP
0.00
CGP
CGP
Aryan ispat
r 49.6km Panthe
280.50 (82.99)
-2.26
0.98
1.00 25.70
4
55 km Pa nth er
Polasponga
Shyam DRI
4X 100 MW + 1 X 67.5 MW
2.9 (-1
.0 28
49.92 Km
Banspani traction
9 6.5 -15
Kuchei 1.01 / 0.99 / 1.00
1.00
-42.62 -7.95 (-0.63) Panther (7.25)
Kuchinda
23.80 (3.60 )
.62 )
TSIL
3) (2 .7
6 0.1 0) 22 0.3 (-1
ose
1.01 (55.94)
-131.20
-24.09(-1
r 38km Panthe
-24.09 (-1.62)
25.10
her km Pant 53.33
-21.39 (7.07)
4.20
25 Km ZEBRA
9
Mo ose Km Mo in Tw in m Tw 1k
IBTPS 258.00
1.01
JHARSUGUDA
0.99
km .43 er 19 th Pan
25 Pa (50 6 .5 0 nth .12 26, er ) 25
.5
5
m
BUDHIPADAR
Zebra
P an th er
er
62
.1 57 -2
1 X 25 MW 1x8
JHARSUGUDA
81 km Zebra
16 4.3 7 (59. 72 ) 181 km
{
ZEBRA
37km
nth Pa
(11 .8 3)
Korba
0.99
21.21
m .3k 57
81 Km
JSPL
(-5.21)
.6
3
Raigarh
Kenduposhi
-10.47 (-0.34)
km 7.3 a br Ze
Bangiriposi
(5.64)
(-5.64)
(11.22)
FMP JODA -15.94
-21.21
0 0.0 0) (0.0
86.50
151 Km
Hexa Zebra
168.51 (51.12)
Ramchandpur
er
57.00 (3.60)
168.51 (51.12)
{
Dharamjaygarh
Pan ther
(2.71)
0.98
WEST BENGAL
35.5 km
nth Pa
91 -4 5. 9) (-9 .5
9) .8 (2 2 .0 -5
1
(0
se
-18.71
81 Km
5 .0
.1 4
54 -26. 7) (-8 .7
32
er th Pan
91.40 Moo km CG P 7) Twin ) .92 .8 km Action ispat .93 29 e 230 4 (1 (36.41) (-6 Moos 16 5.4 9 0) ) Twin 4.3 -1 0.0 2.2 (7.12 km 1.00L&T CEMCO 7 .8 5 (5 9. -3 (-3 230 7) 1.00 45 ) 72) Budhipadar 7 6.3 -88.77 m .4 (27.38 (-(-3.19) -1.79 4 k r 1.01/ 1.00 -4 1 .6 the -9.50 1.79 (-0.50) 7 Km Jharsuguda n -57.12 Km 147km Twin Moose Pa 13 3 -1.79 (79.89) er Traction 2 .6 -19.10 Panth -10.40 -87.39 Jharsuguda 10.40 222 km Twin Moose -10.40 -12.24 -0.9 9 (-3.19) 1.00 (-3.18) Meramundali (-5.43) 0.00 ZEBR 0.15 Km -6.20 (3.19) 68 (151.83) ) -47. 0 ) A Jharsuguda 1.00 (-0.66 (-20 .9 0.99 0.00 16 289.00 SPS 3.32 er MSP -289.00 th 6 Km (-2 0.00 (-146.37) IPP 12.80 4 X 600 MW Brajrajnagar 47.38 )Pan 9.9 77 4) 0.99 (-0.00) (-42.33) -706.00 (2 0. (8.46) Sterlite km CG P 4 8 872.89 -47.17 (-4 4.41 30 Km (-240.37) 3.6 23 1.01 / 1.01 1.1 -1 6 9 3) (270.00) 0 1 X 25 MW ZE 5) BR 7.0 ) 9 X 135 MW (32. Vedanta 13 A SMC CG P (-16.57) 1 .99 9.7 Bhushan 20 (2 1.01 -17.00 1.00 ZE .5 Km 6 13 BRA 1 X 60MW + (1 3 9.7 14. 06 (-2.99) 37 215.40 Km 66.0 1 X 40MW + 6(1 1.01 .99 ZE BR MCL ) CG P 2 X 130MW+ A (56.48) .0 8 ) 37 Basundhra 0.99 (39 .99 2 X 8MW -215.40 -21.35 Hindalco ) -76.74 23.90 Angul (-1.28) (-34.36) 1.01 23.80 355.50 Lapanga (-73.23) CGP 4X 150 MW (7.07) (3.58) 12 (3.60) CGP Kuchinda (59.09) k
km
0.00 (0.00)
-202 .9 2 (66 .0 8 )
15 .2 2 (2 .3 7)
(-6.83)
-32.00 .5 6)
18.86 (0.78)
(9
e Moos
} Bisra
26 k Pan m ther
Twin 110km
A
.2 5)
25
(-0.00)
Raigarh
ZE BR
er Panth
202.37 (35.56)
(23.25)
(24 .60 )
Km
.14 -19 (2.61)
er Panth
130km
Raigarh
-65.71
130 km Zebra
64.91
km
181
-0.00
145 Km Twin Moose
Moose 147km Twin .89) Moose -57.1 2 (79 110km Twin Moo se 91km Twin
(-4.26)
9)
Kharagpur
156.14
0.98 21.05
10
-202.92 (66.08)
(136.11) -11 8.00
Tarkera
Rairangpur
DVC-Jamshedpur
.7 (-0
6)
(-2 5. 01)
(5.83)
Rajgangpur
Km 109 her Pant Km 95
0.99
(-8.77) -15.91
44.18
126 km Zebra
.9 (-0
-139.87(65.81)
1.01 / 1.02
0.98 15.87(9.39)
A BR
11.20
.0 0
ZE
Sundargarh
.39
-139.87 (65.81)
Bhalulata traction
08
(51.12)
Jharsuguda
14 1 Tw Km in Mo os e
116 km Twin Moose
(51.12) 168.51
151 Km
(-4.93)
Jamshedpur
-2
Hexa Zebra
Kalugaon
-3
0
Hexa Zebra
-1 68
168.51
151 Km
-168.67 (51.85) -168.67 (51.85)
Km Twin Moose
.0
{
Korba
SUNDARGARH
-0
Dharamjaygarh
CGP
Nuagaon traction 0.98
-0.07 (-4.21)
-14.57
TISCO
8)
Chaibasa
0.98 2 km her nt 0.94 Pa 8.1 (-18.79) -5.48 (-1.73) -19.2 7 7 20 Bhalulata tap (2 km117.1 3 Pa 202.37 (-6.31) .13) 27 km 5.48 0.94 nth (35.56) 3.272km er Panthe r (1.73) -45.91 Chhend 5 .4 6 0.98 (-9.59) 8 8 (-12 .5 6 230 Bisra (1.5 OCL .3 .4 (26.090 (- 0 8) 0.5km 2) 3 1.01 / 1.01 ) 0.98 .0 Moose Rajgangpur -9.55 15.34 km 14km 0) Tarkera 145km Twin 0.00 -135.63 2 .1 (-9.67) Moose 66.95 Pan 0.98 135 km Twin 1.00 0.99 2 km -38.20 Rourkela 3km ther 8) 0.99 (2 .68 Rajgangpur 88.36 45.85 (27.3 74 0.00 (-11.47) .4 Beekay steels 8 2) -52. traction .7 ) (0.00) m RSP 5 k -7 0.95 8 a (.3 79 -2.6 )0.98 1 0 br 1.00 1.02 -5.4 (-9 .8 Ze 42 0 9 2. 0 () 0.0 r Nald a (-8.77) .02) nthe r (2 4km 23.18 Pa 11.0 -15.91 0.95 Zebra 11.20 8km Pant he (13.17) ther km -15.72 .3 Pan Arya 109 28 5km Chandiposh 2) 93 1 (-10.04)8km -8 8. ste e l -3.39 (2.0 69km Bolani 0.96 CGP (-13.49) ) Panther (14.25 0.96 Barbil ther 2 X 60MW + P an 10km 0.95 4 X 25MW m 130k Panther Panthe 4 81km r -7.4 2 -18.75 (-5.54) -3.00 .2 -2 Bamra traction (-0.08) 1) (-2.77) (-0.39) Joda .6 0.00 (2 0.00 -0.00 1.00 / 0.98 -0.00 4 9.1 (-0.00) -1 B TAP -0.00 28.09 0.00 (-0.00) (-7.93)
JHARSUGUDA -31.00 (-9.97)
Sri Ganesh Adhunik 0.98 metallics
(28.7
-255.40 (12.58)
2 X 30 MW
42 )
0)
CG P
(1 6.
12.69
(9.1 6
1 X 525 MW
7 .9 16
4 .8 -1 9
Orissa state existing network (May-17) geographical map
Jamshedpur
Ranchi
JHARKHAND
765 kV
Paradeep
400 kV
Kendrapara
Chandikhole
220 kV 132 kV
Eastern Regional Power Committee Orissa state existing network (May-17) geographical map APPROVED
REVIEWED
CHECKED
DRAWN
DESCRIPTION
R0
15.09.2017
REVISION
DATE
REMARKS
14, Golf Club Road, Tollygunge, Kolkata, West Bengal 700033
LOA details: ERPC/PR_DBASE/2016/3567 Dated 30 March 2016
Power Research & Development Consultants Private Limited #5, 11th Cross, 2nd Stage, West of Chord Road, Bangalore- 560086, INDIA Ph : +91-080-2319 2209,2159 Fax: +91-080-2319 2210 E-mail :
[email protected]
TM DRAWN IN : MiP-PSCT
DWG. NO. : Geographical Power Map\ER\May-2017\Odisha
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
ANNEXURE-III SHORT CIRCUIT STUDY RESULTS
174
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Table H: State wise 3-Ph and SLG fault results of eastern region grid
Sl. no.
Substation Name
Rated Voltage (kV)
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(MVA)
(kA)
(MVA)
(kA)
Bihar 1
2
3 4
5
6
7
8
Sasarm
Gaya
Purnea_PG Purnea old_PG
Lakhisarai
Muzzafarpur_PG
Patna
kishanganj
9
Banka_PG
10
Barh
11
12
13
14
175
Biharshariff_PG
Biharshariff_PG
Kahalgaon_NTPC
DMTCL
PRDC Bangalore
765
10959.80
8.27
8191.12
6.18
400
12579.11
18.16
9343.19
13.49
132
1495.93
6.54
1050.17
4.59
765
25201.64
19.02
17724.97
13.38
400
25089.66
36.21
17925.31
25.87
220
7057.51
18.52
7346.56
19.28
400
15191.80
21.93
12417.52
17.92
220
7303.11
19.17
7681.78
20.16
220
7142.31
18.74
7204.22
18.91
132
3215.38
14.06
3058.58
13.38
400
10972.97
15.84
6769.02
9.77
132
2207.70
9.66
1533.01
6.71
132
2880.79
12.60
2543.22
11.12
400
13279.94
19.17
10738.05
15.50
220
6117.31
16.05
6740.25
17.69
132
1245.01
5.45
1269.94
5.56
400
17000.04
24.54
11716.48
16.91
220
5795.92
15.21
5875.84
15.42
400
13046.79
18.83
12313.58
17.77
220
7409.09
19.44
4823.95
12.66
132
2500.60
10.94
2569.25
11.24
400
11142.30
16.08
7578.01
10.94
132
2475.68
10.83
2242.01
9.81
400
17852.17
25.77
15737.71
22.72
132
911.83
3.99
500.78
2.19
400
13061.98
18.85
9381.89
13.54
400
17479.21
25.23
11597.39
16.74
220
7841.71
20.58
7933.47
20.82
220
7719.65
20.26
7612.04
19.98
132
2832.31
12.39
2716.28
11.88
400
15627.27
22.56
13635.32
19.68
400
21048.67
30.38
19576.11
28.26
132
3204.59
14.02
3002.17
13.13
400
7216.40
10.42
5448.44
7.86
220
2515.14
6.60
2808.78
7.37
132
1569.72
6.87
1609.80
7.04
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
15
Substation Name
Amnour(Chhapra)
16
Motipur
17
Mushahri
18
Bodhgaya
19
Dehri
20
Fatuha
21
Khagaul
22
Gopalganj
23
Darbhanga
24
MTPS
25
Pusauli
26
Arrah_PG
27
Pusauli New
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
220
1242.92
3.26
761.20
2.00
132
622.57
2.72
467.23
2.04
220
1793.04
4.71
1861.84
4.89
132
1590.11
6.96
1768.65
7.74
220
761.82
2.00
862.24
2.26
132
585.98
2.56
750.14
3.28
220
4991.41
13.10
4013.77
10.53
132
3060.01
13.38
2596.66
11.36
220
3352.58
8.80
2175.52
5.71
132
2058.02
9.00
1530.39
6.69
220
4030.64
10.58
2782.48
7.30
132
2951.24
12.91
2179.83
9.53
220
3132.56
8.22
2301.34
6.04
132
1961.22
8.58
1594.23
6.97
220
1452.91
3.81
1059.62
2.78
132
846.84
3.70
729.37
3.19
220
2515.14
6.60
2808.78
7.37
132
1411.66
6.17
1157.12
5.06
220
4438.19
11.65
4373.12
11.48
132
2293.59
10.03
2246.59
9.83
220
6440.41
16.90
6391.35
16.77
132
2326.61
10.18
2156.83
9.43
220
846.19
2.22
445.61
1.17
132
628.97
2.75
369.41
1.62
220
5903.05
15.49
5496.84
14.43
132
2490.86
10.90
2299.83
10.06
220
5750.37
15.09
5774.68
15.16
132
3427.44
14.99
3101.30
13.57
220
2312.27
6.07
1549.54
4.07
220
2698.07
7.08
1962.25
5.15
132
1195.05
5.23
995.63
4.36
220
2982.04
7.83
2428.32
6.37
132
2493.81
10.91
2228.28
9.75
220
2213.60
5.81
1937.54
5.09
132
1466.12
6.41
1610.84
7.05
220
7018.29
18.42
4652.10
12.21
132
2539.32
11.11
2692.71
11.78
28
Sipara
29
Madhepura
30
Hajipur
31
Begusarai
32
Sonenagar New
33
Kishnganj New
34
Banka
132
1825.09
7.98
1350.02
5.91
35
Kahalgaon
132
2378.33
10.40
1753.55
7.67
176
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
Muzzafarpur
132
1731.21
7.57
1312.54
5.74
37
Purnea
132
3179.23
13.91
2972.71
13.00
38
Sugauli
132
508.35
2.22
303.92
1.33
39
Lauriya
132
299.22
1.31
160.64
0.70
40
Sone nagar
132
1454.82
6.36
1566.69
6.85
41
Karmansa
132
1098.85
4.81
690.99
3.02
42
Jehanabad
132
612.07
2.68
315.44
1.38
43
Rafiganj
132
702.80
3.07
372.03
1.63
44
Hathidah
132
1619.96
7.09
963.30
4.21
45
Jamui
132
1542.34
6.75
1278.59
5.59
46
Sheikhpura
132
548.12
2.40
318.88
1.40
47
Nawada
132
752.37
3.29
429.12
1.88
48
Jamalpur
132
653.35
2.86
355.54
1.56
49
Sultanganj
132
1058.05
4.63
647.49
2.83
50
Sabour
132
1133.97
4.96
706.03
3.09
51
Dumraon
132
302.67
1.32
136.18
0.60
52
Jakkanpur
132
2269.55
9.93
1596.18
6.98
53
Saharsa
132
2854.54
12.49
2398.69
10.49
54
Khagaria
132
530.76
2.32
291.51
1.28
55
Sitamarhi
132
311.24
1.36
344.90
1.51
56
Samastipur new
220
1599.05
4.20
1470.20
3.86
132
1410.07
6.17
1422.94
6.22
57
Pandauli
132
733.67
3.21
454.45
1.99
58
Hajipur New
132
1205.48
5.27
1022.63
4.47
59
Chhapra
132
527.64
2.31
282.40
1.24
60
Siwan
132
369.36
1.62
214.96
0.94
61
Motihari
132
578.98
2.53
355.77
1.56
62
Betiah
132
497.78
2.18
307.89
1.35
63
Ramnagar
132
322.36
1.41
174.07
0.76
64
Rajgir
132
277.98
1.22
127.95
0.56
65
Darbhanga New
132
1569.72
6.87
1609.80
7.04
66
Katihar
132
995.11
4.35
580.33
2.54
67
Belaganj
132
1101.64
4.82
616.33
2.70
68
Vaishali
132
1282.20
5.61
837.29
3.66
69
Sitalpur
132
1120.60
4.90
720.95
3.15
70
Dhaka
132
434.01
1.90
252.25
1.10
71
Jainagar
132
778.32
3.40
524.23
2.29
72
Madhubani
132
773.77
3.38
501.18
2.19
73
Phulparas
132
1500.15
6.56
936.75
4.10
Sl. no.
36
177
Substation Name
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
Supaul
132
1577.81
6.90
994.59
4.35
75
Mohania
132
2115.58
9.25
1591.23
6.96
76
Bikramganj
132
641.42
2.81
355.84
1.56
77
Forbeshganj
132
1596.34
6.98
1001.78
4.38
78
Udakishanganj
132
409.05
1.79
217.32
0.95
79
Baripahari
132
2430.65
10.63
2052.86
8.98
80
Samastipur
132
1418.16
6.20
1412.33
6.18
132
1367.80
5.98
1315.22
5.75
81
Banjari
132
719.07
3.15
404.39
1.77
82
KCL
132
700.97
3.07
392.98
1.72
83
Kataiya
132
1368.03
5.98
807.28
3.53
84
Barauni TPS
132
2367.81
10.36
2372.29
10.38
85
Surajpur
132
187.42
0.82
91.19
0.40
86
Kudra
132
1458.75
6.38
894.93
3.91
87
Chandauti
132
2354.15
10.30
1563.34
6.84
88
Kochas
132
744.54
3.26
405.25
1.77
89
Balmikinagar
132
194.34
0.85
95.13
0.42
90
Masaurhi
132
1134.57
4.96
644.57
2.82
91
Bihta
132
1466.76
6.42
1017.99
4.45
92
Gaighat
132
1114.66
4.88
620.65
2.72
93
Mithapur
132
2177.56
9.52
1513.78
6.62
94
Rafiganj_R
132
676.52
2.96
357.37
1.56
95
Arrah
132
609.20
2.67
354.61
1.55
96
Lakhisarai_
132
1680.56
7.35
1065.33
4.66
97
Raxaul
132
342.63
1.50
194.52
0.85
98
Runisaudpur
132
678.79
2.97
447.75
1.96
99
SKMCH
132
1591.16
6.96
1271.30
5.56
100
Buxar
132
267.83
1.17
118.52
0.52
101
Aurangabad
132
1068.99
4.68
877.99
3.84
102
Tekari
132
887.99
3.88
482.24
2.11
103
Goh
132
600.02
2.62
312.75
1.37
104
Arwal
132
429.32
1.88
215.14
0.94
105
Hulasganj
132
707.64
3.10
400.31
1.75
106
Wajirganj
132
960.81
4.20
549.56
2.40
107
Nalanda
132
255.35
1.12
123.98
0.54
108
Ekanagarsarai
132
938.51
4.11
554.61
2.43
109
Digha
132
1428.99
6.25
980.75
4.29
110
Katra
132
1340.45
5.86
777.35
3.40
111
Gangawara
132
1038.02
4.54
723.43
3.16
Sl. no.
74
178
Substation Name
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
Madhepura
132
1925.25
8.42
1348.30
5.90
113
Sonbarsa
132
580.65
2.54
316.74
1.39
114
Mashrakh
132
370.59
1.62
214.61
0.94
115
Dalsingsarai
132
819.23
3.58
757.17
3.31
116
Kusheshwarnath
132
507.51
2.22
277.66
1.21
117
Jagdispur
132
450.18
1.97
248.35
1.09
118
harbauth
132
964.88
4.22
567.77
2.48
119
Jandaha
132
516.44
2.26
388.02
1.70
120
Imamganj
132
608.60
2.66
330.49
1.45
121
Tetha
132
1277.53
5.59
736.69
3.22
122
Benipati
132
714.90
3.13
536.30
2.35
123
Sheohar
132
265.71
1.16
348.68
1.53
124
Mahanar
132
258.82
1.13
293.61
1.28
125
Belsand
132
953.33
4.17
726.85
3.18
126
Sherghati
132
656.88
2.87
359.24
1.57
127
Paharpur
132
1348.07
5.90
818.65
3.58
128
Ekma
132
277.54
1.21
151.37
0.66
129
Rail Pahiya karkhana
132
770.03
3.37
454.20
1.99
130
Ekma Tap
132
278.71
1.22
152.13
0.67
131
Jhanjha_R
132
981.40
4.29
655.84
2.87
132
Hathidah_R
132
1167.04
5.10
658.85
2.88
133
Khagaul_R
132
1909.54
8.35
1525.49
6.67
134
Khusrupur
132
1965.45
8.60
1247.37
5.46
135
Arrah_R
132
576.33
2.52
332.15
1.45
136
Mokama_R
132
999.30
4.37
553.97
2.42
137
Dumraon_R
132
298.35
1.31
134.42
0.59
138
Hajipur_R
132
1131.68
4.95
909.64
3.98
139
Chhapra_R
132
517.81
2.27
276.78
1.21
140
Kudra_R
132
1497.69
6.55
1053.10
4.61
141
Harinagar sugar mill
132
303.58
1.33
163.17
0.71
142
Karbigahiya
132
2192.34
9.59
1520.30
6.65
143
JahanTrc
132
605.39
2.65
311.90
1.36
144
ShreeCem
132
1010.07
4.42
800.77
3.50
145
Naugachia
132
761.85
3.33
409.06
1.79
146
Beniapatti
132
753.73
3.30
554.08
2.42
147
Hathua
132
565.67
2.47
549.91
2.41
148
Pupri
132
702.83
3.07
522.88
2.29
149
Narkatiyaganj
132
349.74
1.53
201.66
0.88
150
Banmakhi
132
3006.06
13.15
2651.11
11.60
Sl. no.
112
179
Substation Name
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
Substation Name
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
151
Tarapur
132
706.23
3.09
401.88
1.76
152
Triveniganj
132
1066.21
4.66
610.53
2.67
Jharkhand 153 154
Ranchi New_PG Jamshedpur_PG
155
Maithon
156
MPL
157
Chaibasa_PG
158
Koderma_D
159
BTPS_DVC
160
Ranchi_PG
765
19182.36
14.48
13913.94
10.50
400
25528.12
36.85
17053.52
24.62
400
21492.62
31.02
18124.77
26.16
220
6253.98
16.41
6462.76
16.96
400
20514.75
29.61
15608.85
22.53
400
16325.37
23.56
12197.49
17.61
220
11142.92
29.24
10717.30
28.13
400
16963.52
24.49
15579.03
22.49
400
17297.36
24.97
11455.21
16.53
220
3903.03
10.24
3500.94
9.19
400
17899.94
25.84
14568.26
21.03
220
3921.62
10.29
4020.61
10.55
132
1978.45
8.65
1985.52
8.68
400
9314.92
13.45
8809.60
12.72
400
23069.60
33.30
15537.20
22.43
220
6458.91
16.95
6510.28
17.09
161
Chandawa
400
16657.96
24.04
9644.84
13.92
162
Adhunik
400
21401.73
30.89
18046.21
26.05
163
TISCO
400
10835.36
15.64
8484.52
12.25
132
4866.44
21.29
5519.23
24.14
220
6248.92
16.40
6444.26
16.91
132
2627.35
11.49
2440.60
10.68
220
4603.10
12.08
3295.26
8.65
132
2956.76
12.93
2360.93
10.33
220
4499.14
11.81
3613.34
9.48
132
2677.21
11.71
2323.89
10.16
220
3766.77
9.89
3222.04
8.46
132
2054.91
8.99
1794.85
7.85
220
3382.49
8.88
3861.81
10.14
220
1708.98
4.49
1200.56
3.15
132
1974.06
8.63
1314.18
5.75
220
3859.32
10.13
3438.60
9.02
132
1560.62
6.83
1487.09
6.50
220
3253.73
8.54
2058.83
5.40
132
1772.59
7.75
1377.45
6.03
220
8517.27
22.35
8301.23
21.79
164 165 166 167
Ramchandrapur Chandil Hatia New PTPS
168
TTPS
169
Lalmatia
170 171 172
180
Chaibasa Dumka CTPS old
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
173 174 175
Substation Name
Kalyanaswari Jamshedpur_D BTPS_D
176
CTPS New
177
Giridih
178 179
Dhanbad_D Ramgarh
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
132
5765.89
25.22
6034.31
26.39
220
10919.55
28.66
9895.70
25.97
132
4509.84
19.73
4887.79
21.38
220
2589.91
6.80
2138.07
5.61
132
2053.33
8.98
2110.24
9.23
220
8185.07
21.48
8592.76
22.55
132
2295.92
10.04
2253.82
9.86
220
8863.15
23.26
8934.00
23.45
220
4302.60
11.29
3564.03
9.35
132
2131.22
9.32
2277.54
9.96
220
6684.89
17.54
5646.07
14.82
132
1015.46
4.44
988.04
4.32
220
3394.08
8.91
2987.61
7.84
132
2301.25
10.07
2045.84
8.95
180
Garwah
132
880.19
3.85
810.14
3.54
181
Lahardaga
132
986.10
4.31
614.01
2.69
182
Gumla
132
700.72
3.07
397.12
1.74
183
Kamdara
132
721.75
3.16
399.64
1.75
184
Hatia old
132
2658.73
11.63
2290.30
10.02
185
Namkum
132
1344.29
5.88
882.21
3.86
186
Jmatara
132
1045.25
4.57
586.09
2.56
187
Deoghar
132
704.92
3.08
633.35
2.77
188
Dumka
132
1742.85
7.62
1344.04
5.88
189
Goelkhera
132
517.24
2.26
279.77
1.22
190
Kendposi
132
1069.61
4.68
987.77
4.32
191
Manique
132
1455.65
6.37
955.67
4.18
192
Adityapur
132
2568.16
11.23
2074.49
9.07
193
Golmuri
132
1429.48
6.25
857.23
3.75
194
Jaduguda
132
809.99
3.54
441.74
1.93
195
Rajkharsawa
132
1637.30
7.16
1085.71
4.75
196
Noamundi
132
8.45
0.04
8.45
0.04
197
Sikidiri
132
1527.32
6.68
1503.52
6.58
198
Chakradharpur
132
874.57
3.83
497.56
2.18
199
Bakaspur
132
572.96
2.51
310.39
1.36
200
Kanke
132
1486.89
6.50
1038.49
4.54
201
Chaibasa
132
1198.51
5.24
804.05
3.52
202
Latehar
132
590.29
2.58
346.01
1.51
203
Japla
132
802.51
3.51
536.30
2.35
204
Sahebganj
132
594.54
2.60
320.99
1.40
181
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
Pakur
132
375.96
1.64
195.09
0.85
206
Hazaribag
132
850.40
3.72
541.80
2.37
207
Daltonganj
132
404.65
1.77
229.92
1.01
208
Kendposi FD
132
1017.40
4.45
902.46
3.95
209
Tamar
132
652.06
2.85
354.30
1.55
210
Madhupur
132
621.34
2.72
331.69
1.45
211
Manoharpur
132
460.06
2.01
246.67
1.08
212
ECR-Gomia
132
1939.77
8.48
1648.86
7.21
213
Patratu
132
1265.41
5.54
1009.23
4.41
214
Mosabani
132
1168.35
5.11
965.50
4.22
215
Maithon
132
4375.29
19.14
4490.26
19.64
216
Kumardubi
132
3162.10
13.83
2679.39
11.72
217
Panchet
132
2720.39
11.90
2066.48
9.04
218
Patherdih
132
3152.53
13.79
2002.63
8.76
219
Putki
132
3993.24
17.47
2857.44
12.50
220
Nimiaghat
132
1968.47
8.61
1822.78
7.97
221
Barhi
132
1693.97
7.41
1440.38
6.30
222
Koderma
132
1388.62
6.07
1160.15
5.07
223
Konar
132
1321.36
5.78
994.55
4.35
224
North karanpur_D
132
846.81
3.70
561.06
2.45
225
Gola
220
2497.19
6.55
2174.02
9.51
132
2696.33
11.79
637.41
2.79
Sl. no.
205
Substation Name
226
Hazaribag
132
975.34
4.27
1477.91
6.46
227
Ramkanali_D
132
2069.99
9.05
978.55
4.28
228
Manique_D_SW
132
1481.75
6.48
2204.24
9.64
229
Balihari_D
132
3841.82
16.80
1625.70
4.27
230
Electrosteel_D
220
2530.32
6.64
3934.14
10.32
231
BSL_D
220
5196.15
13.64
1225.04
5.36
232
HEC
132
1776.92
7.77
1668.89
7.30
233
APL
132
2108.86
9.22
985.01
4.31
234
JSPL
132
1246.31
5.45
3627.14
15.87
235
Mal-Impex
132
3893.67
17.03
1735.71
7.59
236
Sindri_SW
132
2812.78
12.30
947.35
4.14
237
Pkant_D
132
1679.62
7.35
2508.65
10.97
238
Rajbera_D
132
3465.73
15.16
843.20
3.69
239
Sermuri_D
132
1363.01
5.96
633.60
2.77
240
Gobindpur_D
132
792.70
3.47
869.07
3.80
241
Lodhma_R
132
1372.51
6.00
690.72
3.02
242
Chakradharpur_R
132
1145.43
5.01
764.61
3.34
182
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
Dalbhumgarh_R
132
1010.66
4.42
540.02
2.36
244
Titisoloi_R
132
907.53
3.97
474.98
2.08
245
Shankarpur_R
132
594.41
2.60
513.94
2.25
246
Jamtara_R
132
928.70
4.06
862.21
3.77
247
RKSNR_R
132
1370.65
6.00
618.79
2.71
248
Tolra_R
132
753.86
3.30
824.11
3.61
249
Manique_R
132
1297.48
5.68
737.61
3.23
250
Dalbhumgarh_R
132
986.73
4.32
251
ECR-Barkakhana_D
132
529.07
2.31
252
ECRRky_D
132
253
BSL_D
132
1769.18
7.74
254
Usha Martin
132
2323.03
10.16
728.51
3.19
255
Usha Martin
132
1158.87
5.07
6036.00
26.40
256
CTPS
5765.10
25.22
8062.57
221.66
257
ECRLY_DVC
132 132
1270.01
5.56
695.10
3.04
GoelkheraT
132
504.71
2.21
272.47
1.19
Sl. no.
243
258
Substation Name
809.78
3.54
Odisha 259 260 261
Angul_PG Jharsuguda_PG Jaypore_PG
765
33803.43
25.51
26820.85
20.24
400
36101.97
52.11
29721.63
42.90
765
30205.11
22.80
20001.43
15.10
400
22422.74
32.36
15064.27
21.74
400
8812.36
12.72
6697.34
9.67
220
7087.97
18.60
7039.06
18.47
262
Indravati_PG
400
6656.51
9.61
5650.34
8.16
263
Indravati_Hdro
400
6535.76
9.43
5698.38
8.23
264
Rengali_PG
400
20176.11
29.12
16174.27
23.35
220
8679.31
22.78
8719.97
22.88
400
21635.12
31.23
16850.08
24.32
400
30263.38
43.68
31960.70
46.13
220
11725.40
30.77
11244.74
29.51
400
23858.88
34.44
15584.46
22.49
220
7524.14
19.75
7387.18
19.39
400
12729.54
18.37
10217.98
14.75
220
6271.78
16.46
6791.79
17.82
132
1929.16
8.44
2089.65
9.14
400
33085.21
47.75
28272.26
40.81
220
9076.20
23.82
8484.05
22.27
132
2572.91
11.25
2446.35
10.70
220
13069.98
34.30
13003.50
34.13
265
GMR_3rd
266
STPS
267
268
269
183
Bisra
Baripada
Meramundali
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
270
280 281 282
Substation Name
Sterlite
Dubri New Keonjhar Bolangir
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
400
8366.67
12.08
7933.12
11.45
400
8366.65
12.08
7932.99
11.45
220
9023.09
23.68
8095.18
21.24
400
12880.69
18.59
9832.76
14.19
220
8337.45
21.88
8974.15
23.55
400
6138.97
8.86
4765.11
6.88
220
2830.37
7.43
3054.97
8.02
400
4685.74
6.76
3895.69
5.62
220
3560.02
9.34
3759.53
9.87
283
IndBharat
400
50.63
0.07
42.86
0.06
284
JITPL
400
13847.97
19.99
14106.89
20.36
285
GMR_4
400
21257.37
30.68
17537.78
25.31
400
8633.13
12.46
6853.08
9.89
220
5292.20
13.89
5830.55
15.30
132
1218.21
5.33
1375.18
6.02
286
Mendhasal
287
JSPL
400
17268.04
24.92
15572.79
22.48
288
Pandibil
400
8360.49
12.07
6156.04
8.89
289
RSP
220
5746.17
15.08
4416.54
11.59
132
1023.43
4.48
1271.89
5.56
220
7024.32
18.43
7473.61
19.61
220
7107.37
18.65
7628.53
20.02
290
Balimela
291
Upper Kolab
220
6762.76
17.75
6768.21
17.76
292
Usileru
220
8143.45
21.37
6641.05
17.43
220
7584.97
19.91
7602.26
19.95
132
2297.67
10.05
2440.23
10.67
132
2326.84
10.18
2415.64
10.57
220
6037.45
15.84
5102.17
13.39
220
5550.83
14.57
4445.84
11.67
132
1530.15
6.69
1474.15
6.45
220
3672.19
9.64
3041.68
7.98
132
1481.89
6.48
1657.89
7.25
293
294 295
Jaynagar
Therunali Bhanjanagar
296
Indravati
220
6570.12
17.24
7404.75
19.43
297
Nayagarh
220
2228.52
5.85
1927.55
5.06
220
5123.77
13.45
5489.59
14.41
132
4176.22
18.27
4666.20
20.41
132
3989.86
17.45
3950.25
17.28
220
9699.86
25.46
9034.21
23.71
132
3956.91
17.31
4481.96
19.60
298
299
184
Chandaka
TTPS
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
300 301 302
Substation Name
Tarkera Duburi Joda
303
Chandiposh
304
Balasore
305
Bidanasi
306
Barkote
307
Budhipadar
308 309 310 311 312 313 314
Katapali Narendrapur Bolangir New Atri Samangara Bhadrak Paradip
315
Lakshmipur
316
Lapanga
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
220
7557.69
19.83
6573.81
17.25
132
3702.02
16.19
3953.32
17.29
220
7653.99
20.09
7632.85
20.03
132
2571.28
11.25
2671.95
11.69
220
3402.05
8.93
2733.01
7.17
132
2209.13
9.66
2139.16
9.36
220
3467.35
9.10
2219.51
5.83
220
3321.40
8.72
2988.00
7.84
132
1416.79
6.20
1680.63
7.35
220
3053.89
8.01
2785.94
7.31
132
3899.39
17.06
3789.73
16.58
220
3270.71
8.58
2590.12
6.80
220
14262.63
37.43
13967.80
36.66
132
4808.35
21.03
4770.73
20.87
220
5010.10
13.15
3981.05
10.45
132
4500.14
19.68
4078.95
17.84
220
998.07
2.62
1131.78
2.97
132
781.46
3.42
997.74
4.36
220
3394.63
8.91
3468.56
9.10
132
1569.71
6.87
1803.91
7.89
220
3893.91
10.22
3688.06
9.68
132
1538.84
6.73
1596.97
6.99
220
3080.82
8.09
2702.21
7.09
132
1379.22
6.03
1416.46
6.20
220
2536.35
6.66
2351.54
6.17
132
1432.23
6.26
1727.47
7.56
220
1951.94
5.12
1825.44
4.79
132
1338.31
5.85
1546.02
6.76
220
4144.89
10.88
3028.23
7.95
220
7791.86
20.45
6044.03
15.86
132
5092.37
22.27
4419.96
19.33
220
6297.28
16.53
5591.18
14.67
220
3028.70
7.95
2753.77
7.23
317
MSL
318
Cuttack
132
1427.13
6.24
1498.52
6.55
319
Basundhara
132
2710.07
7.11
1654.83
4.34
320
Bangaripusi
132
850.56
3.72
649.39
2.84
321
BPPL
132
3536.87
15.47
3140.98
13.74
322
Damanjodi
132
664.47
2.91
389.94
1.71
323
Chatrapur
132
682.19
2.98
841.69
3.68
185
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
IRE
132
651.61
2.85
753.82
3.30
325
Aska
132
931.88
4.08
1077.01
4.71
326
Berhampur
132
727.05
3.18
911.27
3.99
327
Ganjam
132
568.67
2.49
615.83
2.69
328
Mohana
132
469.85
2.06
513.16
2.25
329
Phulbani
132
356.59
1.56
419.23
1.83
330
Balugaon
132
348.54
1.52
419.01
1.83
331
Khurda
132
994.66
4.35
1140.11
4.99
332
Puri
132
917.79
4.01
1076.30
4.71
333
Nimapada
132
562.47
2.46
675.16
2.95
334
Bhubaneswar
132
3280.88
14.35
3391.11
14.83
335
Chowdhwar
132
3403.15
14.89
3312.75
14.49
336
Dhenkanal
132
1302.63
5.70
1337.86
5.85
337
Chainpal
132
3515.99
15.38
3698.16
16.18
338
Angul
132
2389.75
10.45
2268.53
9.92
339
Nandira (MCL)
132
1477.95
6.46
1043.45
4.56
340
Nuapatna
132
493.22
2.16
557.42
2.44
341
BAMINPL
132
1128.48
4.94
726.95
3.18
342
Jajpur Road
132
1841.14
8.05
1886.50
8.25
343
Kendrapara
132
954.10
4.17
1128.71
4.94
344
Jaleswar
132
476.35
2.08
554.75
2.43
345
Baripada
132
1291.87
5.65
1382.34
6.05
346
Rairangpur
132
613.05
2.68
631.53
2.76
347
Palapanga
132
782.93
3.42
848.54
3.71
348
Nalda_R
132
562.81
2.46
449.19
1.97
349
Rourkela
132
3475.96
15.20
3602.05
15.76
350
Grid_Steel
132
3296.95
14.42
3245.29
14.19
351
Jharsuguda
132
2950.92
12.91
2790.54
12.21
352
Brajrajnagar
132
2052.06
8.98
1787.68
7.82
353
Rajgangpur
132
2439.71
10.67
2391.54
10.46
354
Sambalpur
132
2494.79
10.91
2181.43
9.54
355
Burla
132
5239.96
22.92
5204.50
22.76
356
Somnathpur
132
90.08
0.39
115.93
0.51
357
Bolangir
132
1569.71
6.87
1803.91
7.89
358
Saintala
132
889.13
3.89
743.80
3.25
359
Khariar
132
341.75
1.50
432.01
1.89
360
Tentulikhunti
132
571.87
2.50
598.89
2.62
361
Kalugaon
132
1899.76
8.31
1666.17
7.29
362
Dighapahari
132
514.55
2.25
594.18
2.60
Sl. no.
324
186
Substation Name
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
Substation Name
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
363
Jagatsinghpur
132
473.09
2.07
507.65
2.22
364
Marshaghai
132
900.47
3.94
958.54
4.19
365
Rairakhol
132
776.52
3.40
621.33
2.72
366
FAP_Joda
132
2152.98
9.42
2035.62
8.90
367
Junagarh
132
291.10
1.27
358.39
1.57
368
Sundargarh
132
1771.14
7.75
1424.91
6.23
369
Boinda
132
962.47
4.21
850.60
3.72
370
Chend
132
2992.67
13.09
2954.42
12.92
371
Chandikhol
132
532.24
2.33
587.27
2.57
372
Umerkote
132
255.69
1.12
299.20
1.31
373
Soro
132
655.28
2.87
723.15
3.16
374
Pattamundai
132
657.89
2.88
703.71
3.08
375
Akhusingarh
132
424.50
1.86
456.19
2.00
376
HMSwitch(Kharagprasad)
132
391.80
1.71
453.48
1.98
377
Paralakhemundi
132
236.68
1.04
275.98
1.21
378
Sonepur
132
496.26
2.17
560.46
2.45
379
Ranasinghpur
132
1224.41
5.36
1339.50
5.86
380
Kalrangi
132
772.45
3.38
711.35
3.11
381
Kamakhyanagar
132
1122.25
4.91
952.84
4.17
382
Jajpur
132
620.51
2.71
720.74
3.15
383
Bolani
132
950.17
4.16
772.60
3.38
384
Sunabeda
132
722.16
3.16
700.53
3.06
385
Patnagarh
132
630.88
2.76
715.65
3.13
386
Padampur
132
376.23
1.65
365.88
1.60
387
Bolangir
132
1506.50
6.59
1707.56
7.47
388
EMAMI
132
90.35
0.40
116.44
0.51
389
Salepur
132
548.38
2.40
565.22
2.47
390
Balugaon_T
132
266.67
1.17
305.05
1.33
391
Bargarh
132
960.73
4.20
1091.37
4.77
392
Phulnakhara
132
1531.09
6.70
1311.39
5.74
393
Karanjia
132
504.81
2.21
528.83
2.31
394
Banki
132
899.62
3.94
827.77
3.62
395
Kesinga
132
716.01
3.13
832.97
3.64
132
716.77
3.14
816.97
3.57
396
Mania
132
1189.10
5.20
951.24
4.16
397
Anandpur
132
1114.31
4.87
1017.59
4.45
398
Barpali
132
469.14
2.05
517.31
2.26
399
Bansapanai
132
1910.54
8.36
1639.72
7.17
400
Barbil
132
631.45
2.76
543.14
2.38
187
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
Substation Name
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
401
Saliban
132
368.97
1.61
395.14
1.73
402
Purushottampur
132
603.46
2.64
578.31
2.53
403
Chandipur
132
275.50
1.21
329.10
1.44
404
konark
132
441.13
1.93
496.00
2.17
405
Samuka
132
649.35
2.84
716.95
3.14
406
Arugul
132
1143.23
5.00
1000.54
4.38
407
Nuapara
132
207.97
0.91
253.32
1.11
408
Dabugaon
132
357.09
1.56
371.21
1.62
409
Boudh
132
307.92
1.35
311.57
1.36
410
kuchinda
132
1048.83
4.59
861.71
3.77
411
Bhawanipatna
132
401.53
1.76
448.13
1.96
412
Kalarangi Tap
132
1017.21
4.45
833.66
3.65
413
Kesura
132
684.15
2.99
725.42
3.17
414
Rengali_PH_G
220
8949.40
23.49
8547.36
22.43
415
PPL
132
1122.38
4.91
1063.49
4.65
416
ITPS
220
9042.80
23.73
8496.04
22.30
417
NINL
220
5762.35
15.12
5124.74
13.45
418
Bhusan Steel
220
9320.36
24.46
9011.53
23.65
419
TSIL
220
2851.55
7.48
2215.87
5.82
420
Jindal Steel
220
7464.62
19.59
7606.52
19.96
421
VISA
220
5016.76
13.17
4267.12
11.20
422
Rohit ferro
220
6253.72
16.41
5474.62
14.37
423
SPS
220
7736.62
20.30
5648.63
14.82
424
Veda_G
220
11645.72
30.56
12652.20
33.20
425
NALCO
220
11547.26
30.30
12347.23
32.40
426
BSSL
220
11948.87
31.36
11580.09
30.39
427
JSPL
220
2820.42
7.40
2055.25
5.39
428
Tata Steel
220
7321.37
19.21
7087.26
18.60
429
ESSAR
220
1818.49
4.77
1626.68
4.27
430
IOCL
220
1772.85
4.65
1562.58
4.10
431
BPRL
132
2072.26
9.06
1772.65
7.75
432
MSL
132
1664.66
7.28
1245.96
5.45
433
IMFA
132
1429.05
6.25
1294.34
5.66
434
ICCL
132
3224.77
14.11
3398.12
14.86
435
FCI
132
2226.28
9.74
1656.36
7.25
436
FACOR
132
1370.40
5.99
1592.24
6.96
437
Balasore Alloy
132
1184.10
5.18
1138.45
4.98
438
Birla Tyr
132
1290.47
5.64
1358.14
5.94
439
Hindalco
132
4714.92
20.62
5180.41
22.66
188
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
Substation Name
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
3539.25
15.48
2955.38
12.93
440
Chiplima
132
441
ACC
132
911.90
3.99
992.43
4.34
13.32
2919.70
12.77
442
CTC
132
3044.96
443
132
385.02
1.68
435.18
1.90
444
SGEL Action Ispath
132
2834.79
12.40
2706.81
11.84
445
L&T Cemco
132
1900.76
8.31
1363.13
5.96
446
PowerMax
132
572.91
2.51
527.17
2.31
447
OCL
132
2386.20
10.44
2313.72
10.12
448
ARATI
132
1526.78
6.68
1472.70
6.44
449
SamalMtl
132
388.28
1.70
443.87
1.94
450
NBVL
132
393.77
1.72
458.97
2.01
451
MCL
132
2076.37
9.08
1316.49
5.76
452
HindMetals
132
390.08
1.71
448.77
1.96
453
OPTCL
132
1592.51
6.97
1183.05
5.17
454
BC_Monty
132
1732.39
7.58
1324.05
5.79
455
Tomka_Tr
132
1163.31
5.09
756.18
3.31
456
JKPaper
132
1136.78
4.97
878.76
3.84
457
IFFCO
132
1230.68
5.38
1385.73
6.06
458
HAL
132
713.53
3.12
684.48
2.99
459
PPT
132
1081.27
4.73
990.83
4.33
460
Vedanta
132
1016.43
4.45
1074.61
4.70
461
Rungta
132
1770.81
7.75
1307.36
5.72
462
BRG
132
2120.50
9.28
1733.58
7.58
463
Machakunda
132
1170.09
5.12
1237.31
5.41
464
Machakunda Road_SW
132
489.01
2.14
273.95
1.20
465
Maheshwari
132
1612.16
7.05
1275.78
5.58
466
RAWMET
132
1591.60
6.96
1091.69
4.78
467
ShyamDRI
132
2485.35
10.87
1933.31
8.46
468
AryanISt
132
3583.40
15.67
2723.79
11.91
469
Rathi
132
2491.14
10.90
1732.72
7.58
470
Sriganesh
132
1302.95
5.70
979.58
4.29
471
Arya
132
745.03
3.26
612.87
2.68
472
BRP_St
132
641.71
2.81
484.80
2.12
473
Menaksh
132
665.95
2.91
584.19
2.56
474
MSP
132
459.15
2.01
440.89
1.93
475
OCL_TA
132
1038.48
4.54
828.60
3.62
476
B-Rtap
132
0.26
0.00
0.21
0.00
477
Basta
132
768.45
3.36
788.55
3.45
478
SMC
132
2413.96
10.56
1755.21
7.68
189
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
JambyFe
132
2114.72
9.25
1619.85
7.09
480
BEEKAY
132
472.93
2.07
344.84
1.51
481
Rajgangpur_R
132
2299.37
10.06
2135.43
9.34
482
Rambha_R
132
463.95
2.03
388.72
1.70
483
Solari_R
132
309.64
1.35
321.97
1.41
484
Kaipada_R
132
776.92
3.40
686.21
3.00
485
Jhakpur_R
132
1427.42
6.24
996.62
4.36
486
Bhadrak_R
132
1117.04
4.89
1019.40
4.46
487
Balasore-R
132
1267.75
5.55
1307.76
5.72
488
Jaleswar_R
132
465.74
2.04
526.78
2.30
489
Bhulta_R
132
395.24
1.73
268.18
1.17
490
Nuagaon_R
132
836.01
3.66
484.49
2.12
491
Jharsuguda_R
132
2920.25
12.77
2735.97
11.97
492
Kendrapara_R
132
2482.18
10.86
1918.09
8.39
493
Jornda_R
132
811.63
3.55
597.27
2.61
494
Meramundali_R
132
387.80
1.70
442.60
1.94
495
Jagannath_R
132
773.77
3.38
972.79
4.26
496
JayNagar_R
132
2233.69
9.77
2297.48
10.05
497
Padwa_R
132
395.89
1.73
216.84
0.95
498
Manbar_R
132
866.88
3.79
537.15
2.35
499
MalinG_R
132
1370.09
5.99
991.73
4.34
500
CHKSM-R
132
1088.45
4.76
720.18
3.15
501
Dhmraptr_R
132
445.39
1.95
270.24
1.18
502
Dhmra_R
132
646.35
2.83
435.27
1.90
503
Goreknath_R
132
399.52
1.75
363.97
1.59
504
Bamra_R
132
0.26
0.00
0.21
0.00
505
Keonjhor_R
132
573.39
2.51
473.97
2.07
Sl. no.
479
Substation Name
West Bengal 506
507
Jeerat
Arambag
508
Durgapur
509
Kharagpur
510
190
Raghunathpur
PRDC Bangalore
400
9690.07
13.99
9215.96
13.30
220
7925.99
20.80
9025.67
23.69
132
4143.21
18.12
4796.39
20.98
400
15454.41
22.31
12923.45
18.65
220
9648.25
25.32
10495.71
27.54
132
3304.49
14.45
4054.99
17.74
400
13201.12
19.05
11460.11
16.54
400
12146.99
17.53
10037.42
14.49
220
6149.64
16.14
6827.84
17.92
132
1807.98
7.91
2144.34
9.38
400
14393.43
20.78
12833.76
18.52
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
511 512
513
514
Substation Name
Purullia pump storage Bidhannagar
Kolaghat
Bakreswar
515
sagardighi
516
Haldia
517
518 519 520 521 522 523 524 525
Parulia
Malda
Binaguri Subhasgarm_PG Gokarna Mejia Farakka Alipurduar PG Vidyasagar Park
526
Sadaipur
527
Dharampur
528 529
191
Domjur Gokarna
PRDC Bangalore
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
400
13386.38
19.32
12570.58
18.14
400
15229.95
21.98
12329.91
17.80
220
9596.50
25.18
10410.48
27.32
132
3399.15
14.87
4120.62
18.02
400
12707.42
18.34
12322.64
17.79
220
5601.63
14.70
6360.31
16.69
132
3184.60
13.93
3858.33
16.88
400
8886.64
12.83
8756.59
12.64
220
9925.43
26.05
10834.88
28.43
400
18390.99
26.55
17393.50
25.11
220
6623.50
17.38
6949.42
18.24
400
6023.85
8.70
6236.07
9.00
400
13905.08
20.07
9744.27
14.07
400
15223.38
21.97
12077.35
17.43
220
9025.47
23.69
9411.62
24.70
220
9025.51
23.69
9411.89
24.70
400
16869.33
24.35
12736.29
18.38
220
5271.88
13.84
5757.85
15.11
132
2060.14
9.01
2529.82
11.07
400
17609.12
25.42
14378.21
20.75
220
6601.39
17.32
6809.04
17.87
400
7612.53
10.99
8188.35
11.82
220
6310.44
16.56
7845.37
20.59
400
9660.93
13.94
7615.30
10.99
400
14711.91
21.24
13681.97
19.75
400
30659.76
44.25
30596.02
44.16
220
4846.40
12.72
5436.12
14.27
400
14626.65
21.11
8959.07
12.93
220
7084.48
18.59
6522.35
17.12
220
2139.68
5.62
1574.61
4.13
132
1738.85
7.61
1371.88
6.00
220
8591.81
22.55
7965.11
20.90
220
5455.14
14.32
4920.50
12.91
132
4743.77
20.75
4575.64
20.01
220
4941.00
12.97
4786.77
12.56
132
3640.13
15.92
4189.15
18.32
220
7909.06
20.76
8258.72
21.67
132
3255.12
14.24
4094.34
17.91
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
530 531 532 533 534 535 536 537 538 539 540 541 542
543
544
545 546 547 548
192
Substation Name
Howrah Kasba Laxmikantapur Midnapur New Jalpaigudi New Haldia Rishra Satgachia Santhaldih Asansol krishnagar Bisnupur Calcutta Leather Complex
Subhasgarm
New Town Action Area-3
Hura Foundary Park Dalkhola DTPS (Waria)
PRDC Bangalore
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
220
4234.98
11.11
4330.01
11.36
132
2874.36
12.57
3565.98
15.60
220
5455.57
14.32
5834.77
15.31
132
3778.64
16.53
4871.81
21.31
220
2797.38
7.34
2959.87
7.77
132
1500.15
6.56
1967.21
8.60
220
4708.58
12.36
4435.30
11.64
132
2351.56
10.29
2873.87
12.57
220
5992.45
15.73
6030.73
15.83
132
3771.70
16.50
4462.15
19.52
220
3005.86
7.89
2745.14
7.20
132
2506.02
10.96
2728.17
11.93
220
4832.75
12.68
4533.91
11.90
132
4103.50
17.95
4873.48
21.32
220
3474.25
9.12
3172.02
8.32
132
2318.18
10.14
2741.06
11.99
220
5022.45
13.18
5263.82
13.81
132
1328.04
5.81
1444.20
6.32
220
2381.29
6.25
2227.61
5.85
132
1368.33
5.99
1620.77
7.09
220
3496.48
9.18
3199.33
8.40
132
2051.95
8.98
2449.98
10.72
220
4225.97
11.09
3976.10
10.44
132
2209.53
9.66
2723.96
11.91
220
4481.43
11.76
4385.71
11.51
132
3293.47
14.41
3834.49
16.77
220
6251.67
16.41
7694.33
20.19
132
1809.15
7.91
2224.80
9.73
220
5330.45
13.99
5457.77
14.32
132
2622.45
11.47
3030.64
13.26
220
2487.77
6.53
2347.90
6.16
132
1542.85
6.75
1863.69
8.15
220
4455.65
11.69
4360.41
11.44
132
1628.00
7.12
1992.31
8.71
220
6336.21
16.63
5199.10
13.64
132
2041.54
8.93
2380.06
10.41
220
7879.56
20.68
7569.86
19.87
132
3503.23
15.32
3913.96
17.12
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
Substation Name
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
220
8158.86
21.41
7755.54
20.35
549
Barjora
132
1046.25
4.58
1039.33
4.55
550
Parullia_D
220
9078.15
23.82
9386.16
24.63
551
J K Nagar
220
3153.32
8.28
2906.61
7.63
552
Durgapur(Muchipara)
220
7902.46
20.74
7337.89
19.26
553
Burnpur
220
4818.72
12.65
3539.49
9.29
554
Mejia
220
11468.89
30.10
12840.49
33.70
555
DPL
220
7831.15
20.55
8446.85
22.17
132
2334.56
10.21
2978.66
13.03
220
2683.84
7.04
2703.80
7.10
220
3229.14
8.47
3582.53
9.40
132
3371.47
14.75
4163.20
18.21
132
2248.54
9.84
2869.97
12.55
220
2683.98
7.04
2707.07
7.10
220
3473.08
9.11
4156.66
10.91
132
1733.66
7.58
2346.48
10.26
132
3769.73
16.49
4861.77
21.27
132
3769.72
16.49
4861.76
21.27
220
2987.44
7.84
3594.88
9.43
132
1304.34
5.71
1713.80
7.50
132
2736.84
11.97
3486.17
15.25
220
6777.88
17.79
5832.84
15.31
132
2171.09
9.50
2544.18
11.13
220
6176.08
16.21
5942.33
15.60
132
3528.18
15.43
3774.25
16.51
556
557
558
559 560
BBGS_C
EMSS_C
NCGS_C
Birpara Siliguri
561
Dalkhola
220
6417.14
16.84
5263.19
13.81
562
Adisaptagram
132
3799.49
16.62
3668.00
16.04
563
Alipurduar
132
764.27
3.34
904.15
3.96
564
AshokNagar
132
2361.53
10.33
2480.59
10.85
565
mahispota
132
1764.59
7.72
1263.63
5.53
566
Balurghat
132
541.12
2.37
587.85
2.57
567
Bankura
132
1461.22
6.39
1495.65
6.54
568
Barasat
132
1229.80
5.38
1359.78
5.95
569
Basithpur
132
1102.01
4.82
1147.97
5.02
570
Joka
132
903.87
3.95
1113.10
4.87
571
Berhampore
132
1880.53
8.23
2052.80
8.98
572
Birpara
132
2153.97
9.42
2505.04
10.96
573
Bishnupur
132
2056.33
8.99
2396.74
10.48
574
Bolpur
132
1379.52
6.03
1510.86
6.61
193
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
Substation Name
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
1477.46
6.46
1410.93
6.17
575
Bongaon
132
576
C k Road
132
634.65
2.78
700.16
3.06
577
Lebong
132
1253.17
5.48
846.73
3.70
578
Debagram
132
964.51
4.22
910.29
3.98
579
Dhulian
132
649.68
2.84
703.77
3.08
580
Egra
220
2956.87
7.76
2766.02
7.26
132
1928.69
8.44
2304.58
10.08
132
577.47
2.53
382.15
1.67
132
593.96
2.60
396.68
1.74
581
Food Park
582
SaltLake GIS
132
1653.36
7.23
1344.17
5.88
583
Bajkul
132
1612.94
7.06
1195.37
5.23
584
Falta
132
1000.26
4.38
1189.82
5.20
585
Haldia
132
2467.47
10.79
2654.45
11.61
586
Hizlee
132
952.22
4.17
1071.53
4.69
587
Kalyani
132
2956.81
12.93
2480.24
10.85
588
Katwa
132
1012.04
4.43
1132.15
4.95
589
Khanyan
132
2110.02
9.23
1728.05
7.56
590
Kolaghat
132
2770.75
12.12
3093.71
13.53
591
Lilooah
132
2645.34
11.57
3092.80
13.53
592
Malda
132
1825.63
7.99
2192.18
9.59
593
Mankar
132
1501.64
6.57
1489.32
6.51
594
Myanaguri
132
1561.15
6.83
1545.07
6.76
595
North Bengal University
132
3108.05
13.59
3187.14
13.94
596
Pingla
132
1065.10
4.66
1208.86
5.29
597
Purulia
132
852.25
3.73
987.12
4.32
598
Raiganj
132
1224.83
5.36
1193.52
5.22
599
Raina
132
1468.03
6.42
1564.82
6.84
600
Rampurhat
132
975.38
4.27
1042.26
4.56
601
Ranaghat
132
1961.40
8.58
2058.65
9.00
602
Mathabang
132
403.72
1.77
482.42
2.11
603
SaltLake
132
2268.87
9.92
2291.14
10.02
604
Samsi
132
516.02
2.26
627.77
2.75
605
Siliguri
132
2532.02
11.08
2501.17
10.94
606
Sonarpur
132
1808.28
7.91
1817.59
7.95
607
Tamluk
132
2262.46
9.90
2171.74
9.50
608
Tarkeshwar
132
2299.61
10.06
2086.04
9.12
609
Titagarh
132
1760.68
7.70
1955.95
8.56
610
Ukhra
132
1779.76
7.78
1851.13
8.10
611
Uluberia
132
2635.50
11.53
2608.10
11.41
194
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Sl. no.
Substation Name
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
612
Sirakol
132
1000.39
4.38
1167.13
5.11
613
Cossipur
132
1187.99
5.20
901.80
3.94
614
Balichak
132
1166.21
5.10
997.91
4.37
615
TCF-1
132
2203.55
9.64
1944.39
8.50
616
Dankuni
132
1759.33
7.70
1417.06
6.20
617
Debagram
132
847.11
3.71
721.69
3.16
618
Balurghat
132
1461.71
6.39
1272.83
5.57
619
Modern
132
1724.81
7.54
1647.05
7.20
620
Jangipara
132
2092.68
9.15
1853.92
8.11
621
Chanditala
132
3696.06
16.17
3728.36
16.31
622
Gangarampur
132
550.86
2.41
608.05
2.66
623
Birsingha
132
1701.81
7.44
1656.08
7.24
624
Coochbehar
132
735.39
3.22
910.73
3.98
625
Belmuri
132
2357.81
10.31
2052.46
8.98
626
Barjora
132
1020.93
4.47
989.04
4.33
627
Chalsa
132
998.73
4.37
1027.59
4.50
628
Mechand
132
824.22
3.61
957.83
4.19
629
Raghunathpur
132
1296.21
5.67
1322.50
5.78
630
Amtala
132
873.47
3.82
1002.41
4.38
631
Contai
132
1202.82
5.26
1226.69
5.37
632
Haldia NIZ
132
1988.81
8.70
1799.42
7.87
633
Jhargram
132
998.83
4.37
1016.55
4.45
634
Lalgola
132
1466.21
6.41
1402.27
6.13
635
Najirpur
132
762.83
3.34
857.31
3.75
636
Bighati
132
3765.10
16.47
3523.19
15.41
637
RMBLK
132
1622.83
7.10
1173.58
5.13
638
TMBL
132
1627.46
7.12
1172.51
5.13
639
Farakka
132
997.05
4.36
1096.17
4.79
640
Khatri
132
781.33
3.42
863.96
3.78
641
Kalna
132
1518.96
6.64
1467.06
6.42
642
Kakdwip
132
751.19
3.29
785.12
3.43
643
Kurseong
132
1333.54
5.83
796.75
3.49
644
Bagnan
132
2380.23
10.41
2329.18
10.19
645
Sonarlal
132
1141.79
4.99
789.90
3.46
646
Saintia
132
1351.79
5.91
1434.14
6.27
647
New Town Action Area-1
132
2123.54
9.29
2111.93
9.24
648
Ujanu
132
2326.70
10.18
2272.97
9.94
649
BEL CCp
132
942.29
4.12
970.52
4.25
650
Belmuri
132
791.64
3.46
736.88
3.22
195
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
Burdwan
132
1065.29
4.66
961.51
4.21
652
Bagmundi
132
349.65
1.53
380.00
1.66
653
Kharagpur
132
714.86
3.13
456.20
2.00
654
Howrah
132
690.71
3.02
502.20
2.20
655
Kalapahari
132
2685.98
11.75
1824.18
7.98
656
Purulia
132
1640.73
7.18
979.70
4.29
657
Bandel
132
5675.26
24.82
6114.19
26.74
658
Jamuria
132
917.13
4.01
522.93
2.29
659
TCF
132
787.97
3.45
466.29
2.04
660
ASP
132
2906.56
12.71
2672.72
11.69
661
DPL A Zone
132
2178.67
9.53
2588.91
11.32
662
DPL B Zone
132
2257.80
9.88
2812.78
12.30
663
DPL AB Zone
132
2261.43
9.89
2747.34
12.02
664
DPL C Zone
132
2069.35
9.05
2331.40
10.20
665
DPL C1 Zone
132
2035.40
8.90
2236.78
9.78
666
Bamunara
132
1998.49
8.74
2122.87
9.29
667
NCGS_C
132
2736.84
11.97
3486.17
15.25
668
SRS_C
132
2287.02
10.00
2863.86
12.53
132
2206.68
9.65
2773.16
12.13
132
1744.39
7.63
1939.88
8.49
132
2542.01
11.12
3199.97
14.00
132
2491.97
10.90
3190.52
13.96
132
1271.42
5.56
1670.10
7.31
132
2876.86
12.58
3669.14
16.05
132
1541.34
6.74
2077.66
9.09
132
2100.29
9.19
2618.40
11.45
132
2247.78
9.83
2869.04
12.55
132
3343.92
14.63
4313.24
18.87
132
2024.51
8.86
2559.05
11.19
Sl. no.
651
669
Substation Name
TRS_C
670
Majerhat_C
671
BT Road_C
672
673
Princep Street_C
East calcutta_C
674
Rishra_C
132
3736.48
16.34
4439.71
19.42
675
Taratala_C
132
2478.32
10.84
3171.54
13.87
676
Chakmir_C
132
2566.69
11.23
3263.01
14.27
677
Jadavpur_C
132
2860.81
12.51
3577.11
15.65
132
2258.74
9.88
2856.57
12.49
678
BBD Bag_C
132
2248.54
9.84
2869.96
12.55
679
Botanical garden_C
132
2830.72
12.38
3511.02
15.36
680
Belur_C
132
2523.95
11.04
2965.77
12.97
681
Park Lane_C
132
1590.74
6.96
2123.71
9.29
132
1590.74
6.96
2123.72
9.29
196
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
DumDum_C
132
3033.54
13.27
3883.94
16.99
683
Patuli_C
132
1590.74
6.96
2131.85
9.32
684
Park Circus_C
132
1642.57
7.18
2225.18
9.73
685
Majerhat_C
132
2491.97
10.90
3190.52
13.96
686
Kalingpong
66
410.45
3.59
313.21
2.74
687
Alipurduar
66
224.60
1.97
59.20
0.52
688
Birpara
66
337.50
2.95
689
Jali
66
286.13
2.50
318.61
2.79
66
291.63
2.55
301.13
2.63
Sl. no.
682
Substation Name
690
Chalsa
66
383.73
3.36
207.79
1.82
691
Salakati NER
220
5789.30
15.19
6029.57
15.82
692
Chukha
220
4042.58
10.61
3929.16
10.31
693
Rammam
132
1714.07
7.50
1575.61
6.89
694
WBIDC
132
1672.98
7.32
1232.34
5.39
695
IPCL Haldia
220
2889.89
7.58
2576.97
6.76
696
Teesta Low Dam
220
1671.35
4.39
1601.32
4.20
697
Teesta Low Dam
220
1574.90
4.13
1380.65
3.62
698
RaghunathGanj
132
1188.67
5.20
1346.19
5.89
699
Madras Cement
132
2086.93
9.13
1780.34
7.79
700
HPCL
132
2370.55
10.37
2422.51
10.60
701
Bencon Street
132
1289.12
5.64
1173.31
5.13
702
Tata Power
132
2218.01
9.70
2202.81
9.64
703
Khejuria
132
1029.35
4.50
1157.80
5.06
704
Kuli
132
1498.81
6.56
1368.13
5.98
705
Ambuja
132
872.69
3.82
833.98
3.65
132
846.27
3.70
786.91
3.44
132
372.29
1.63
201.04
0.88
132
346.20
1.51
185.94
0.81
706
BRG Steel
707
Manaksia
132
1933.91
8.46
1711.19
7.48
708
Hizli TSS
132
941.98
4.12
1038.10
4.54
709
Jaysree
132
3408.95
14.91
3275.75
14.33
710
OCL Bishnupur
132
397.50
1.74
219.77
0.96
711
Emammi Cement
132
1449.72
6.34
1390.34
6.08
712
Bolpur TSS
132
1324.34
5.79
1384.68
6.06
713
Badri Narayan alloy
132
549.10
2.40
351.96
1.54
714
Sonic Thermal
132
1002.63
4.39
954.63
4.18
715
Cresent power
132
1121.68
4.91
1082.46
4.74
716
TGS
132
2542.01
11.12
3199.97
14.00
717
Chakaradharpur_R
132
589.73
2.58
599.63
2.62
197
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
Dhatrigram_R
132
1161.95
5.08
815.77
3.57
719
Katwa_R
132
956.35
4.18
1001.83
4.38
720
Bankura_R
132
1431.49
6.26
1434.30
6.27
721
Barasat_R
132
1130.09
4.94
1137.77
4.98
Sl. no.
718
Substation Name
Sikkim 400
11244.84
16.23
11314.16
16.33
220
6997.55
18.36
8081.32
21.21
132
2973.17
13.00
2905.25
12.71
Teesta-5
400
10251.12
14.80
10139.75
14.64
724
Teesta-3
400
8707.29
12.57
9651.70
13.93
725
Jorethang
220
4668.95
12.25
4281.59
11.24
726
New Melli
220
4834.48
12.69
4363.98
11.45
727
Chuzachen
132
1823.04
7.97
1806.49
7.90
728
Rongit
132
2079.32
9.10
1667.70
7.29
66
148.60
1.30
145.99
1.28
132
2065.66
9.04
1645.58
7.20
132
1200.54
5.25
777.79
3.40
66
259.57
2.27
218.87
1.92
132
1353.72
5.92
916.92
4.01
66
503.27
4.40
427.38
3.74
132
2068.04
9.05
1482.31
6.48
66
630.66
5.52
560.98
4.91
722 723
Rangpo_PG
729
Sagbari
730
Geyzing
731 732
Gangtok Melli
733
Melli
66
627.45
5.49
556.43
4.87
734
Tadong
66
383.08
3.35
295.70
2.59
735
Bulbuley
66
372.34
3.26
285.28
2.50
736
Sichey
66
365.37
3.20
278.58
2.44
737
Rongli
66
176.51
1.54
114.20
1.00
738
Mamring
66
271.44
2.37
192.30
1.68
739
Namchi
66
320.21
2.80
238.41
2.09
740
Rabangla
66
123.25
1.08
108.74
0.95
741
Rohtak
66
189.87
1.66
129.59
1.13
742
Soreng
66
151.22
1.32
101.59
0.89
743
Lower Lagyep
66
482.47
4.22
402.41
3.52
744
Phudong
66
210.81
1.84
146.47
1.28
745
Geyzing
66
259.67
2.27
218.55
1.91
746
Purano Namchi
66
239.76
2.10
167.29
1.46
747
Pakyong
66
313.10
2.74
210.09
1.84
748
Pelling
66
244.13
2.14
201.48
1.76
749
Rhenock
66
140.52
1.23
90.39
0.79
198
PRDC Bangalore
September 2017
Web based Protection Database and Desktop based Protection setting calculation tool – ERPC
Rated Voltage
3-Ph to Ground fault
SLG fault
3-Phase MVA
Fault Current
1-Phase MVA
Fault Current
(kV)
(MVA)
(kA)
(MVA)
(kA)
Mangan
66
139.24
1.22
93.48
0.82
751
Rnipool
66
484.98
4.24
405.38
3.55
752
Topakhani
66
264.16
2.31
189.04
1.65
753
Meyong
66
115.58
1.01
76.81
0.67
754
Rongli
66
159.85
1.40
103.13
0.90
Sl. no.
750
199
Substation Name
PRDC Bangalore
September 2017