Loading documents preview...
Hi-Tech Gears
Dec-10
Introduction Founded in year 1986 A part of 100 million USD multi-location, multi-dimensional diversified Hi-Tech Group Products ranges from Automotive transmission parts to Industrial Robots Inbuilt Lean and TPM philosophies in operations Over 1600+ people ranging from Operational technologist to AI researchers Applied excellence in:
Manufacturing Transmission & Engine Components Engineering Services Industrial Automation & Robotics Embedded Systems and Artificial Intelligence
Vision & Mission Statement Hi-Tech Gears Vision
“Be A Global Footprint Company and A Benchmark For World Class Manufacturing Systems” Hi-Tech Gears Mission
“We will be the preferred partner in delivering engineering products and design solutions through lean philosophy with a focus on: • Building a customer centric organization • Rapid development of products and innovative solutions • Ensuring cost effectiveness • Developing competent and committed people”
Organization Deep Kapuria 50-50 Joint Venture with GETRAG
Pranav Kapuria Hitech Gears Ltd
Getrag Hitech Gears I. pvt Ltd Timing Gears
Suman Kumar GETRAG Hi-Tech
Bhiwadi
Avinash Rao
Human Resource
Anuj Kapuria Hitech Robotic Systemz
Hitech ESoft
Power Transmission & Two-Wheeler Precision Forging/ Engineering Prec. Machining Transmission Unit Solutions Engine Components
Rajesh Magoo
A.K. Verma
HGL Bhiwadi T&EC Plant
HGL Bhiwadi 2W Plant
HGL Manesar Plant
Prashant Kumar
S.K. Chatterjee
cc A.K. Verma
Corporate Strategic Planning
Business Development
Robotics
Prashant Joshi
K. Srinivasan
Millennium Plaza
Info City Gurgaon
Gurgaon
Finance & Accounts
Milestones 1986 - 1990 The Beginning Product Indigenization
•Incorporated as a Public Ltd Co. •Production Commencement Single Source to Hero Honda
1991 - 1995
1996 - 2000
2001 - 2005
Technology Tie-Ups & Indigenization
Extending Partnership to Global Supply Chain
Growth for Domain Leadership
•Technical Tie-Up with MUSASHI (Honda Motors, Japan)
•Technical Partnership with GETRAG, U.S. (1996 ~2006)
•Launched initiative of ‘Lean’ Manufacturing
•Backward Integration into Precision Forging
• Started Business with TATA CUMMINS LTD.
•Single Source supplier to Honda Power.
• Started supplies to Cummins Via Getrag •Certified as ISO 9002 & QS 9000 •Started Engineering software division Hi-Tech e-Soft
•Certified for •TS 16949 •ISO 14001 •OHSAS 18001 •State-of-the-art manufacturing facility set up at Manesar •Established HiTech Robotic Systemz
2006 - …. Consolidation & Moving up the Value Chain
•TPM implemented in full-scale across the group; TPM Excellence Award Awarded by JIPM •ACMA Gold Medal for Manufacturing Excellence
•Shingo Silver Medallion for Operational Excellence •New Plant Setup
•Hi-Tech Robotics & Hi-Tech E-Soft certified for • ISO9001
Operations Foot Print Hi-Tech Gears Ltd.
Hi-Tech Gears Ltd.
IMT Manesar
Bhiwadi Plant
• Trans. Gears & Shafts, Precision machined parts • ISO TS16949 •Striving for ISO14000 •Striving for OSHAS 18001
•Trans. Gears & Shafts Engine Gears, Precision machining & forging •ISO TS16949 •ISO14000 •OSHAS 18001
Hi-Tech Gears Ltd. Corporate Office
Hi-Tech Robotic Systemz
GETRAG Hi-Tech Gears Ltd.
Gurgaon
Gurgaon / Pune / Chennai
Bhiwadi
•Computer Vision, Artificial Intelligence, and Robotics
•Joint Venture with GETRAG Corp USA - 100% EOU for Timing Gears •ISO TS16949 •ISO14000 •OSHAS 18001
•12th & 14th Floor
Hi-Tech Gears Ltd.
•ISO 9001
New Plant at Bhiwadi Under Construction
HI-TECH e-Soft Gurgaon / Pune / Chennai •A Division of Hi-Tech Gears •e - Engineering Services •ISO 9001
Vulcan Electro Control Bhiwadi • Machine Refurbishing • Machining •ISO 9001
Clientele
Strategic Alliances
Corporate Strategy Technology Regularly upgrade manufacturing technologies to world class Q,C,D standards Align manufacturing with the “Lean Philosophy” R&D facilities to develop Robots-Micro & Industrial, automotive embedded vision& safety solutions
Create an environment conducive for absorption of technology through training
Corporate Strategy Marketing
To focus on OEMs for local supply and exports
Supply world class components
Broaden the customer base Marketing of Engineering Services & robotics as a separate division
Corporate Strategy Finance To remunerate the shareholders Maintain the healthy debt equity ratio and current ratio Follow International Accounting Standards Maintain a reasonable profit & growth level keeping in view the commitments to customers, shareholders
Corporate Social Commitment
TPM
03-Dec-10
14
Products Offering thru Manufacturing Foot Print : Hi-Tech Gears Timing Gears (Capacity – 1.5 Mn.) Diesel Engine for Off Highway Vehicles & Gensets
Transmission Gears & Shafts (Capacity – 0.5 Mn.) Passenger Car & MUV
Power Take Off Units (Capacity – 0.3 Mn.) Off Highway Vehicles
Precision Forging & Machining (Capacity – 4.5 Mn.)
Diesel Engine & Other Automotive Applications
Transmission Gears & Shafts (Capacity – 18 Mn.) 2-Wheelers (Motorcycles & Scooters)
Diversified Customer Breadth North America
Europe
Asia (Excl. India)
Getrag Cummins Caterpillar Robert Bosch
GAWD JCB Cummins Robert Bosch Lister Peter
Cummins Robert Bosch
India South America Cummins Robert Bosch MWM
Hero Honda Honda Motorcycle & Scooters India Honda Siel Cars India Tata Cummins Cummins India DICV New Holland Tractors JCB Avtec (for GM India) Simpson Bharat Forge Musashi
Lean Supply Chain Logistics North America
Europe
Asia (Excl. India)
FCL ~ 12 Shipments (L.T. 30~35 Days) LCL ~ 40 Shipments (L.T. 40~45 Days)
FCL ~ 4 Shipments (L.T. 25~30 Days) LCL ~ 5 Shipments (L.T. 25~30 Days)
LCL ~ 10 Shipments (L.T. ~25 Days)
Customer Support Engineer stationed at Customer Site
India South America LCL ~ 10 Shipments (L.T. 55~60 Days)
Outbound Customer ~ 140 Shipments Key i3PL Partners •Panalpina •Khuene Nagel •Schenker •OTS Astracon LLC
Customer Support Engineer stationed at Customer Site
•Single point contact to the export customers for cargo related queries •Cost minimization by maximizing returnable packaging & other improvements e.g. started long term contracts with i3PL for better rates negotiation, importing packing material from Sweden on behalf of one customer under bond to reduce cost # of shipments are expressed in per month basis
Products Development Approach • Robust APQP Process inline with TS16949 standard • Design support thru Hi-Tech E-Soft • Inspection plan development as per international standards e.g. DIN, JIS, AGMA, ISO • Adoption to customers‟ standards e.g. Volvo & Caterpillar Inspection Software • Close interface with customer thru single point contact • Product design VA / VE ideas generation and discussion along with customer • Timely development thru structured Project Management Office (PMO)
Suggested and implemented elimination of non value added holes
Suggested three piece component to one piece component to save cost (approval awaited)
Manufacturing Processes Forging
Finishing
• Hot Forging • Warm Forging • Cold Forging • Cold Extrusion • Coining
• Gear Grinder…New • Honing, • Gear Honing, • Hard Turning, • Grinding, etc.
Machining
Die Manufacturing
• CNC Turning • Gear Cutting (Wet & Dry Hobbing / Broaching / Shaping / Shaving) • Spline Rolling • Auto Shaft straightening • Deep Hole Drilling, etc
Heat Treatment
• Normalizing • Case Carburizing, • Carbo-nitriding, • Nitro Carburizing, • Press Quenching…New • Hardening • Tempering etc.
• Vertical Machining Center • EDM, etc.
Automation • Automation design and fabrication unit, • Vision Inspection • Robot integration setup
Manufacturing Infrastructure
Quality System & Support Approach • Integrated Management System in compliance of ISO TS16949 • Hi-Tech Customer Support Engineers located at major customer sites in India and U.S. • Effective and efficient response system to customer complaints/ concerns • Lead time to reacting on customer return for immediate action – max. 24 hrs • Lead time to Investigation & proposed action – max. 48 hours • Lead time to plan submission for corrective and preventive action – max. 7days • Complaints closure thru Poka-Yoke • Tracking for non- repetition thru Kakotora Activity
BEFORE
AFTER Sensor Loacting Loacting Pin Locate on O/D (Not in Teeth)
Example of POKA YOKE to avoid Punching angle out due to wrong broaching operation
Testing Infrastructure Standard Room
Test Instruments Calibration Cutter Grinder
Metallurgy Lab
Vickers Rockwell Hardness Tester Hardness Tester
Microscope
Dial Calibration Height Micrometer Master Master Callibration Master
Shaving cutter Grinder
Strive for Business Excellence & Policy Deployment thru ‘Mini-Factory’ Concept Hi-Tech Group has the clearly defined process for 'Business Plan Development' and 'Policy Deployment‟ – Business Strategy Development
Mid-Term Plan
Policy Deployment (Linked with Performance Management System)
Annual Operating Plan & Project Bank
To support the policy deployment, we have „Project Management Office‟ (PMO) • Operational controls thru PMO • Mini Factory Structure (Factories within Factory) • Ownership and management control by line supervisors & associates • Glasswall is divided into – Daily Work Management (DWM) Glass wall Monthly Performance Indicator Glass wall Focused Improvement Glass wall Employees Morale Glass wall
Mini-Factory Glass wall Meeting
PRODUCTIVITY QUALITY
COST
DELIVERY
SAFETY
MORALE
ENVIRONMENT
Adoption of Lean Philosophy
TPM OFFICE OFFICE TPM
EDUC. TRAINING & TRAINING EDUC.&
INITIAL CONTROL INITIALCONTROL
S.H.E. S.H.E.
QUALITY MAINT. QUALITY MAINT.
MAINT. PLANNED PLANNED MAINT.
KAIZEN KOBETSU KOBETSU KAIZEN
HOSEN JISHU HOSEN JISHU
Adoption of TPM Philosophy
TPM TPM
TOTAL EMPLOYEES INVOLVEMENT TOTAL EMPLOYEES INVOLVEMENT
All TPM 8 Pillars Structure & activities are in place at all manufacturing location at Hi-Tech Gears
Visual Factory
Examples of Process Control Systems & Tools
Recognition & Awards AWARD/ RECOGNITION
YEAR
RECOGNITION BY
GOLD AWARD – ICQCC 2010 (INTERNATIONAL LEVEL)
2010
QUALITY CIRCLE FORUM OF INDIA
GOLD AWARD – QUALITY CIRCLE CONVENTION
2010
QUALITY CIRCLE FORUM OF INDIA (DELHI CHAPTER)
SILVER TROPHY FOR EXPORT EXCELLENCE SHINGO PRIZE (SILVER MEDAL)
2009-10
ACMA
2009
SHINGO PRIZE ACADEMY, U.S.
2009
JAPAN INSTITUTE OF PLANT MAINTENANCE (JIPM), JAPAN
[DESCRIBED BY BUSINESS WEEK MAGAZINE AS THE “NOBEL PRIZE OF MANUFACTURING”]
TPM EXCELLENCE AWARD BEST SUPPLIER AWARD
2007-08
FIAT GROUP NEW HOLLAND INDIA
GOLD TROPHY FOR MANUFACTURING EXCELLENCE
2007-08
AUTO COMPONENTS MANUFACTURERS ASSOCATION OF INDIA
SILVER TROPHY FOR EXPORT EXCELLENCE
2007-08
ACMA
STATE AWARD FOR EXPORT EXCELLENCE BRONZE TROPHY FOR EXPORT EXCELLENCE EXCELLENT PERFORMANCE AWARD
2008 2006-07
GOVT. OF RAJASTHAN ACMA
2007
CUMMINS INDIA
AWARDED FOR DEPENDABILITY ON DELIVERY
2006-07
TATA CUMMINS
AWARDED FOR ACHIEVING QUALITY AND DELIVERY TARGETS
2005-06
HONDA MOTOR CYCLES AND SCOOTERS
AWARDED FOR VALUABLE CONTRIBUTION AND SUPPORT
2006
HONDA MOTOR CYCLES AND SCOOTERS
BEST QUALILTY AWARD
2004
TATA CUMMINS
03-Dec-10
28
T&EC Business Overview Transmission & Engine Components (T&EC) is one of the business vertical that contributes about 15% of total Hi-Tech Gears business (2008-09) and manufactures primarily timing gears for diesel engines for light, medium & heavy commercial / offhighway vehicles and transmission gears & shafts for four wheeler vehicles and other applications.
INR Mn.
Actual Forecast
This business vertical is having a wide customer base that include some of the most prestigious OEMs with spread around the globe including United States and Europe. Existing Major Customers
New Customers
Tata Cummins
DICV
Cummins
JCB UK
Caterpillar
JCB IN
New Holland
MWM Brazil
Honda Siel
New Plant Envisioning Envisaging its solid growth, Hi-Tech Gears is getting ready to set-up a new ECOFAC green world-class facility on Lean Logistics principles at Bhiwadi just opposite to the mother plant that shall set new benchmarks in manufacturing
PROJECT SITE HI-TECH GEARS BHIWADI PLANT
Salient Features of New Plant • 21,100 sq.m. facility • Shop Area - 4627 sq.m (Ist phase) • 100% Future Expansion Provision • Vaastu Compliant Design • ECOFAC Green Building (Maintenance-Friendly)
• Sophisticated Machining Setup • Manufacturing Excellence Drive – • Lean – Mini factory concept / Pull system / Flow lines • TPM – Pillars activities PROJECT SITE
• TEI – Team activities and Kaizen culture
• Sound Operating System thru Image Plan HI-TECH GEARS BHIWADI PLANT
T&EC New Plant Vision
Rev. 01
TO BE A BENCHMARK IN OPERATIONAL EXCELLENCE THROUGH CULTURE OF TOTAL EMPLOYEE INVOLVEMENT TO PROVIDE CUSTOMER DELIGHT LEARNING ORGANIZATION RIGHT TALENT VISUAL FACTORY
EHS
SYSTEM-DRIVEN ECO FACTORY
CONTINUOUS FLOW
LEAN LOGISTICS ALL ROUND GROWTH
SHARED LEADERSHIP
T&EC New Plant Philosophy
A P CONTINUOUS IMPROVEMENT D C
CUSTOMER
SUPPLIER
TEI
TPM
LEAN
NEW PLANT PHILOSOPHY LEAN LOGISTICS OPERATING MODEL Customer Demand Driven Operating Model with Least Thruput Time Efficient Return on Investment
GREEN ECOFAC PLANT Resource-Efficient (On the principal of 3Rs - Reduce, Reuse, Recycle) Maintenance-Friendly (Economical, Social, and Ecological Sustainable)
TOTAL EMPLOYEES INVOLEMENT Employees-Friendly Operations Culture of Continuous Improvement
System Organisation Infrastructure
SCRAPYARD
WASTE DISPO.
6.0M. WIDE R.C.C. ROAD
Image Plan Framework
WALKWAYS2.00MWIDE
SHOP PHAS
WALKWAYS2.00MWI
SHO PHAS
INFRASTRUCTURE
Incoming Materials Dock & Receipt Area
DWM Action Log
# of Non Conformity Found
Action on Non Conformity
DWM Action Log
# of Accidents
Audit Score
# of Kaizen
# of Accidents
Audit Score
Form 2
Form 3
Form 1
Form 2
Form 3
3500 mm
2000 mm
PENDING KANBAN
ND ITION ING
WALK WAYS 2.00M WID E
R ECO SH ED
WALK WAYS .200MWIDE
BI N WAS HING BI N STORAG E
6.0 M. WIDE R.C.C. R O A D
K WAYS 2.00M WI DE WA L WASTE DISPO .
F.G. DI SPATCH PLATEFORM WALK WAYS .200MWIDE
AMONI A
L.P.G. STORAGE
Tur ni gId eas i ntoRe a lity Ar ch it ect u r e, St ru ct ur e, P l ann er s & In t er io r s J- 2/1 5B as em en t , Kh i rk i E xt n. Ma lv iy aN a gar N ew D el hi - 1100 17 Pho ne 011- 32565 401, 3 25654 18- 93 51409 980 e m a il - i nf o@ s hi l pka ar ar chi t ect s .c o m
Receipt Display Board
Scissor Lift
Unpacking Tools Stand
PPAP Files/ Limit Sample Cabinet
Tags (Order) Chute
Surface Plate
Retur n Chute Guages & Doc. Rack
Insp. Desk Insp. Desk (1000x800 mm) (1000x800 mm)
Receipt Desk (1000x800mm)
Rev.00 (11-Oct-08)
METERROOM 300 0X40 00
Receipt Trolley
Board & Doc. Rack
Revision Details
2.5 MVA T- 1
2PO LE STRU CTURE
Marker Board
example
4POL E STRUCT URE 33 KVHTLINE
VCB RO OM 90 00X7 000
Platform
Suppliers Kanban Status Board
RESP. - _______
2000 mm
ARRANGEMENT TIME - _______
MAINTAINEDLA WN
2. 5MV A T-2 SEC./W. B RIDGE ROOM
POCKET FOR KANBAN
1000 mm (Clear ) Bench for Drivers
1000 mm (Clear)
30mLE NGTH STRUC TURE WALKWAYS2. 00MWIDE
C AP. PANEL
Trolley Arrange men t as per FIFO Rule
Action on Non Conformity
W N
WALKWAYS2. 00MWIDE
SHOP FL OO R PH ASE -I
4
SF6-2
# of Non Conformity Found # of Kaizen
Form 1
Supplier Tags Receipt Pending Lots Performance Vs Inspected Details Status
S E
230THK BRICK WALL (TO BEDI SMENTAL LATER)
WALKWAYS2. 0M WI DE
Partition between Rec eipt Store & Supermarket
SF6- 3
# of Indirect Pending Lots Lots Receipt Details Vs Pending
SOFT WATER
WALKWAYS2. 00MWIDE
SF6-4
Receipt Vs Pending
6.0 M . WIDE R.C.C. R O AD
Dept. Targets
Process 3
D.M . WATER
SCRAP YARD
Dept Objective
Process 2
R. O. PLANT
WALKWA YS2.00M WI DE
Org Structure
Process 1
K WAYS 2.00M WI DE WA L
Dept. Targets
Process 3
SLUDGE DISPOSA L
SHO P F LO OR PHASE - II
Pallet Truck
Dept Objective
Process 2
4.50 M. WIDE C .C . R O A D
E. T.P.
WALK WAYS 2 . 00MWIDE
Powered
Org Structure
Process 1
4
20 0 + 5 50
S.T. P.
Vendor Rejection Material Area
Incoming Inspection Board Updation by - _________ Time - _____
Inspection Display Board
Materials Receipt Board Updation by - _________ Time - _____
WALKWAYS2.00MWIDE
IMAGE PLAN FRAMEWORK (INFRASTRUCTURE)
Pallets Arrangeme nt as per FIFO Rule
SYSTEMS
1600 mm
ORGANIZATION
Chute having one lot per pocket showing pending # of lots
Example Image Plan - System PROCESS < EXAMPLE > CUSTOMER DEMAND RECEIPT & CONVERTING TO LEVELLED SCHEDULE FOR PRODUCTION
Process 3
Process 1
Action on Non Conformity
DWM Action Log
# of Kaizen
# of Accidents
Audit Score
# of Kaizen
# of Accidents
Audit Score
Form 1
Form 2
Form 3
Form 1
Form 2
Form 3
1000 mm (Clear)
3500 mm
2000 mm VENDOR
ARRANGEMENT TIME - _______
MON. MON
TUE MON.
WED
THU
RESP. - _______
FRI
SAT
PENDING KANBAN KANBAN DROP POST
2000 mm
KANBAN STATUS BOARD DATE
A D W A Y S 2 .0 0 M
W A S H IN G S TO R AG E
W A LK
B IN B IN
6 .0 M . W ID E
R .C .C . R
W ID E
O
W ID E
P LA TE F O R M
F .G . D IS P A T C H W ID E W A Y S 2 .0 0 M
S T O R A G E
L .P .G .
A M O N IA
W A LK
4 PO LE S TR U C TU R E 3 3 K V H T L IN E
VCB ROOM 90 00X 7000
2 .5 M V A T -2
2 .5 M V A T -1
M ETER R OOM 3000X 4000
S E C ./W .B R ID G E ROOM
2 P OLE S TR U C TU R E
Receipt Trolley
T u rn in g Id e a s in t o R e a lit y
A r c h ite c tu r e , S t r u c tu r e , P la n n e r s & J - 2 / 1 5 B a s e m e n t, K h ir k i E x t n . M a lv N e w D e lh i - 1 1 0 0 1 7 Phone 011- 32565401, 32565418- 935 e m a il - in f o @ s h ilp k a a r a r c h ite c ts .c o m
Receipt Display Board
Platform
Scissor Lift
XYZ ZKN ASD
Tags (Order ) Chute
Suppliers Kanban Status Board
ZDC
Unpacking Tools Stand
PPAP Files/ Limit Sample Cabinet
Surface Plate
Return C Guages & Doc. Rack
Insp. Desk Insp. Desk (1000x800 mm) (1000x800 mm)
Board & Doc. Rack
Receipt Desk (1000x800mm)
Marker Board
Rev.00 (11-Oct-08)
W A Y S 2 .0 0 M W A LK W ID E 2 .0 0 M W A YS W A LK
CAP. PANEL
ABC
Revision Details
R E C O N D IT IO N IN G
A D O
W ID E
R .C .C . R
W A Y S 2 .0 0 M W A LK D IS P O .
Y A R DW A S T E
6 .0 M . W ID E
S C R AP
W ID E
3 0m LE N G T H S TRU C TU R E
W A L K W A Y S 2 .0 0 M W ID E
POCKET FOR KANBAN
Bench for Drivers
1000 mm (Clear)
4
M A IN T A IN E D L A W N
Powered
# of Non Conformity Found
Partition between Receipt Store & Supermarket
W N
W A L K W A Y S 2 .0 0 M W ID E
SH O P FLO O R P H A S E -I
Vendor Rejection Material Area
DWM Action Log
Supplier Tags Receipt Pending Lots Performance Vs Inspected Details Status
S E
2 3 0 T H K B R IC K W A L L ( T O B E D IS M E N T A L L A T E R )
W A L K W A Y S 2 .0 0 M W ID E
Trolley Arrangement as per FIFO Rule
Action on Non Conformity
Process 3
SOFT W ATER
W A L K W A Y S 2 .0 0 M W ID E
S F 6 -2
# of Non Conformity Found
Process 2
Dept. Targets
D .M . W ATER
S F 6 -3
# of Indirect Pending Lots Lots Receipt Details Vs Pending
Dept Objective
R .O . PLANT
W A Y S 2 .0 0 M
Org Structure
SLU DG E D IS P O S A L
SH O P FLO O R P H A S E - II
S F 6 -4
Receipt Vs Pending
Process 2
Updation by - _________ Time - _____
Dept. Targets
Inspection Display Board
Process 1
Dept Objective
1600 mm
Org Structure
E .T .P .
W A L K W A Y S 2 .0 0 M W ID E
Pallet Truck
Updation by - _________ Time - _____
4 .5 0 M . W ID E C .C . R O A D
S .T .P .
W A LK
Incoming Inspection Board
Pallets Arrangement as per FIFO Rule
Materials Receipt Board
4
200 + 550
S H E D
WALK WAYS 2.00M WIDE
Example Image Plan - Infrastructure IMAGE PLAN FRAMEWORK (INFRASTRUCTURE) Incoming Materials Dock & Receipt Area
Chute having one lot per pocket showing pending # of lots
hute
ECOFAC DRIVE thru IGBC CERTIFICATION With the objective of building the Green ECOFAC plant, Hi-Tech Gears is aspiring to challenge the IGBC Green Factory Building Certification
Focus shall be on • Efficient use of resources (on the principles of 3Rs – Reduce, Reuse, Recycle) • Maintenance friendliness
Implementation drive shall be through • Study, analyzing the IGBC Green Factory Building Certification requirements and incorporating them into project timeline (one time tasks) and daily work management (for recurring tasks)
• System review / upgrade – ISO 14001 • TPM activities
Total Employees Involvement Approach Total Employees Involvement is intended to be achieved by strengthening the relationship as depicted in the diagram.
GREEN BUILDING & LEAF (ecofac)
HAPPY SUPPLIER (Leveled Schedule)
Business Head
GREEN BUILDING & LEAF
LEAN LOGISTICS Each employee shall be assigned to an experienced, HAPPYmore SUPPLIER (ecofac) (frequent delivery in senior employee - a mentor – who provides(Leveled guidance Schedule) Operations small lots) through the process of making actual work-related Head LEAN LOGISTICS improvements GREEN BUILDING & LEAF
HAPPY INV (sees grow
(frequent delivery in CNC MACHINES (ecofac) Supplier small lots) (technology) Production
HAPPY SUPPLIER (Leveled Schedule)
Head
(sees growth)
GREEN BUILDING & LEAF LEAN LOGISTICS HAPPY SUPPLIER (frequent(ecofac) delivery in CNC MACHINES Supplier (technology) Mini-Factory (Leveled Schedule) small lots)
A P CONTINUOUS IMPROVEMENT D C
Leader
LEAN LOGISTICS (frequent delivery inCNC MACHINES small Supplier lots) (technology)
oo SUPPLIER
A P CONTINUOUS IMPROVEMENT D C
A SPIC „N SP P CONTINUOUS IMPROVEMENT Hi-Tech Gea (high level D C HAPPY INVESTOR
SUPPLIER Hi-Tech Gears
oo oo o o LEAN LOGI SPIC „N SPAN(frequent d Hi-Tech (high Gears level of 5-S) small lots) oo SUPPLIER
oo oo o o LEAN LOGISTICS CNC CNCo o (frequent delivery in small lots)
o oo
SH
CNC (gl
LOAD LEVELING Supplier
CNC MACHINES (technology)
A P CONTINUOUS IMPROVEMENT D C
oo SUPPLIER
CNC oo o o
o oo
SUPPLIER Gears LOAD Hi-Tech
LEVELING
LOAD LEVELING oo SUPPLIER
SUPPLIER
oo
CNC
oo o o
CNC
oo oo
LOAD LEVELING
CNC oo oo
CNC
CNC
MUS SUPERMARKET Custom RHY (pull system) (sou
TOYOTA $ CNC CNC MUSIC NOTES as KATA SUPERMARKET RHYTHM OF WORK (pull system) (sound operating plan APPROACH
LOAD LEVELING CNC SUPPLIER
LOAD LEVELING
LOAD LEVELING
CNC
CNC
CNC
SUPERMARKET (pull system)
MUSIC NOTES as CUSTOMER HAPPY EMPLO RHYTHM OF WORK (sound operating plan) (employee frien
…THANKS FOR YOUR ATTENTION