Innovators (cost Reduction)

  • Uploaded by: Anonymous Y5cnLVYMG
  • 0
  • 0
  • February 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Innovators (cost Reduction) as PDF for free.

More details

  • Words: 664
  • Pages: 13
Loading documents preview...
Company Logo

2nd CII National Kaizen Circle Compétition 2019 A Kaizen Presentation By

(SANDEN VIKAS INDIA PVT. LTD., FARIDABAD) On: 11 & 12th June -19

Venue : India Habitat Centre , New Delhi

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Company Profile

Company Logo

INTRODUCTION :-SANDEN VIKAS INDIA PVT. LTD. Sanden Vikas, Faridabad Sanden Vikas, Bhagola

Sanden Vikas, Ballabgarh

36 Years of Partnership

Sanden Vikas, Neemrana

Total Group Company : 12 nos. Total Manpower : 3500 nos.

Sanden Vikas, Pune

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Company Product & Customers

Company Logo

Clutch

Clutch

Variable Compressor

Variable Compressor

Fixed Compressor

Fixed Compressor

Fixed Compressor

HVAC

HVAC

HVAC

Injection Molding

Injection Moulding

Injection Moulding

Injection Moulding

Hose & Pipe

Hose & Pipe

Hose & Pipe

Hose & Pipe

Mil/Annum

Capacity :

STR

Hose & Pipe 1990

1992

1995

2008

2012

NEW BUSSINESS

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Kaizen Theme

Company Logo Kaizen Theme

Cost Reduction Implemented Area

Variable Compressor Assembly Line (SDV-2) Implementation Team:

Nakul (Team Member)

Aayushi (Team Member )

Diksha (Team Member)

Bharat Verma (Team Member)

Ashok Deshwal (Team Facilitator )

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Problem / Present Status

Company Logo

High Manufacturing Cost Factors Manufacturing Cost COST

In-Direct Cost

Direct Cost  

 

Material Cost Labour Cost

Reduce 2 Manpower by 1.Work Re-balancing 2.Layout Modification 3.Cycle Time Study

Indirect material Cost Indirect manufacturing Cost FUTURE CUSTOMER FORECAST FREQUENT COST REDUCTIONS

Focusing On Labour Cost

FLUCTUATING CUSTOMER DEMANDS

INCREASED CUSTOMER REQUIREMENTS

NEW INVESTMENT

IMPROVE EXISTING

NEW INVESTMENT NOT REQUIRED FOR UPCOMING PLAN

SCOPE OF IMPROVEMENT

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Before Situation

Company Logo

Lip Seal Assy Lot No. stamping Angle Setting

Return spring Assy PP Straightening C.B. & PP Assy.

Total Processes :- 51 Total Manpower :- 39

Cycle Time Study

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Before Situation

Company Logo

20 Sec

12.9 Sec 18.5 Sec

14.2 Sec

17.6 Sec

12.3 Sec

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Before Situation

Company Logo 2

Improvement 1

Manpower Deployment at Stations 03 Manpower at 3 Machine

Return Spring Assy.

1.Return Spring Assy.-1 M/P 2.PP Straightening M/C-1 M/P 3.Pp & CB Assy.-1 M/P PP Straightening M/C

PP & CB Assy.

1 Improvement 2

Lip Seal Assy.

Automatic Conveyor

Model Stamp

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

After Situation

Company Logo

03 Manpower at 3 Machine

1.Return Spring Assy.-1 M/P 2.PP Straightening M/C-1 M/P 3.Pp & CB Assy.-1 M/P

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Company Logo

After Situation

02 Manpower at 3 Machine 1.Return Spring Assy.-1 M/P 2.PP Straightening M/C 1 M/P 3.Pp & CB Assy.-

1

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

After Situation

Company Logo 20 Sec

THEN

21.3 Sec

12.9 Sec

18.5 Sec

23.1 Sec

NOW

\

18.6 Sec

THEN

14.2 Sec

NOW

17.6 Sec 20.9 Sec

12.3 Sec

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Benefits Achieved

Company Logo Qualitative:

1.Reduce Fatigue 2.Reduce Part Contamination 3.Improved Material Handling

Quantitative:

Productivity : Quality

:

Cost

:

Delivery

:

Safety

:

Morale

:

From 2.08

2.16

3,12,000 INR

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019

Kaizen Sheet Reactive

Proactive

Category: Innovative

Kaizen Title: Problem/Present Status: High Manpower Cost 1.(03 Machine placed in 03 locations, 03 Operator required to operate) 2.(03 Machine placed in 03 locations, 03 Operator required to operate)

Company Logo

Company

MM/YY

Sr.No

Sanden Vikas India Pvt. Ld.

05/19

01

Implemented Area : Variable Before Improvement:

1

Compressor Line

Implemented by: Aayushi Diksha

Result/Benefit: (a) Qualitative1) Improve Material handling 2) Reduce Contamination with covered conveyor

Root Cause Identification:

After Improvement:

(b) Quantitative 01 Reduce Manpower

1. 2. 3.

Extra Manpower for Machine Manual material transportation Operator Waiting time

1

2

Standardization: 1) 2)

Root cause-Layout Constraint

Idea to eliminate root cause:-Line Balancing, Cycle Time Study Counter-measure Gravity Conveyor @ 90°

Return Block cleaning frequency added in check sheet PP Dent Checking Frequency to be Added

How many places this Kaizen can be deployed horizontally No