Loading documents preview...
Inspection and Test Plan Piping Fabrication Document Number:
XXXX XXXX XXXXX
XXXXXX—XXXX--XXXXX Piping and Mechanical Works Contract No. XXXXXXXXX X
Approval and Change History Issue
Description Date
Piping Fabrication
0
Issued for Approval
1
Revised to Incorporate Client Comments
Page 1 of 5
Quality
Approval Proj. Man.
Inspection & Test Plan
Contract No. XXXXXXX ITP Number XXXX XXXXX
Authorised: XXXXX XXXXX Date: XXX XXX XXX
Piping Fabrication No.
Operation Document Number
1.0
Standard, Spec or Drawing
Verifying Document/ Report
AS4041
Inspection
Remarks
Response .
Workshop Fabricator
Fabricato r
Client
PE/QC
H
H/R
R
PE/QC
H
H/R
M/R
Approvals
1.1
Welding Procedure Specification (WPS) approval
1.2
Qualify welders to approved WPS
AS4041
Approved WPS/PQR WQR
1.3
Prepare WPS and Approved Welder Registers
AS4041
Registers
PE/QC
H
H/R
R
1.4
Review Subcontractors ITP’s
XXXXXXXX
ITP
PE/QC
H
H/R
R
AS4041
D/Dkt/PO
WF/ST
M
M
M
D/Dkt/PO
WF/ST
V/D
M
M
2.0
(May be used as a sign off column by xxxxxxxxxxx or the Client to indicate that the activity has been satisfactorily completed)
Project Quality Plan
Not required if this pre-approved ITP is used
Materials
2.1
Receive materials
2.1
Inspect materials: • quantities • conformance to requirements • dimensional • damage • material certification
Project Quality Plan
XXXXXX
Inspection Codes Key
Piping Fabrication
H W M
Hold Point Witness Monitor
V D R
Visual Inspection Dimension Inspection Review & Approve Documentation Page 2 of 5
PE WF TR QC
Project Engineer Workshop Foreman Tradesman Quality Inspector
Responsibility ST EX SC
Storeman Inspection/Expeditor Sub-Contractor
Inspection & Test Plan
Contract No. XXXXXXX ITP Number XXXX XXXXX
Authorised: XXXXX XXXXX Date: XXX XXX XXX
Piping Fabrication No.
Operation Document Number
3.0
Standard, Spec or Drawing
Verifying Document/ Report
AS4041
Inspection
Remarks
Response .
Workshop Fabricator
Fabricato r
Client
Current Revision Documents
WF/QC
M
M
M
AS4041
AFC Dwg
WF/EX
V/M
M
M
AS4041 & WPS AS4041/ AS4037
AFC Dwg
WF/QC
V/M
M
M
EC-F-054
WF/QC
V/D
M
R
(May be used as a sign off column by xxxxxxxxxxx or the Client to indicate that the activity has been satisfactorily completed)
Shop Fabrication
3.1
Approved WPS available at work station
3.2
Check material for item, type, material, size, rating & unique number
3.3
Check weld preparations
3.4
Calculate NDT % Requirements on Piping – Confirm Piping Class
3.5
Check welding consumables
WPS
WPS
WF/QC
V/M
M
M
3.6
Check fit up, configuration, dimension and orientation
WPS
AFC Dwg
WF/QC
V/M
M
M
3.7
Check for spool and sub spool identification
Project Quality Plan
AFC Dwg
WF/QC
V/M
M
M
Register/WQR
WF/QC
R
M
M
WPS
WF/QC
M
M
M
Weld Maps
WF/QC
V/M
M
M
WPS
WF/QC
V/M
M
M
3.8
Check welder qualification
AFC Drawings Welder Register
3.9
Check welding parameters
WPS
3.10
Check weld marking (welder’s ID, date and consumable)
3.11
Check weld root and hot pass
3.12
Check removal of slag, spatter, scale and flux
AS4041
ITP
WF/QC
V/M
M
M
3.13
Check completed weld
AS4041
ITP
WF/QC
V/M
M
M
Inspection Codes Key
Piping Fabrication
H W M
Hold Point Witness Monitor
V D R
Visual Inspection Dimension Inspection Review & Approve Documentation Page 3 of 5
PE WF TR QC
Project Engineer Workshop Foreman Tradesman Quality Inspector
Nominate on Subcontractors NDT% Form amount and type of NDT required. i.e PT/MT or UT/RT - Construction code acceptance criteria shall be SPEC 000-S-0011 on all NATA NDT testing reports
Verify & accept by signing section 4.6 of this ITP Verify & accept by signing section 4.6 of this ITP
Responsibility ST EX SC
Storeman Inspection/Expeditor Sub-Contractor
Inspection & Test Plan
Contract No. XXXXXXX ITP Number XXXX XXXXX
Authorised: XXXXX XXXXX Date: XXX XXX XXX
Piping Fabrication No.
Operation Document Number
Standard, Spec or Drawing
Verifying Document/ Report
Response .
Workshop Fabricator
Fabricato r
Client
Inspection
Remarks
3.14
Record welding traceability information
AS4041
Not Report
WF/QC
R
M
M
3.15
Final dimensional check
AS4041
AFC Dwg
WF/Ex
V/D/M
M
M
AS4041
This ITP
WF/QC
V
M
M
H
R
W
Punch list
M
M
M
Engineering Drawing marked in red pen NDT Reports
R
R
H
R
R
Ex/PE Ex/PE
M H
M H/W
M M
PE/Ex
H/R
H/R
R
Ex Ex
M H/R
M M
M M/R
4.0
Inspection and Testing
4.1
All Welds 100% Visual
4.2
NDE as per AS4041 • 5% RT and MPI for Class 2A Piping • Exempt for Class 3 Piping
Project Quality Plan
4.3
Pipework marking and identification correct
4.4
Mark up drawings as built as necessary
4.5
Veryify NDT% has been completed
5.0 5.1 5.2
6.0
(May be used as a sign off column by xxxxxxxxxxx or the Client to indicate that the activity has been satisfactorily completed)
Verify & Accept by signing section 4.1 of this ITP
NATA Report Engineering Drawings
AS 4041
Final Inspection Inspect delivery dockets to ensure that they record every item Final inspection and release
Project Quality Plan
AS4041
Project Management Plan
AS4041 AFC Drwgs P. O./ Scope
This ITP
Verify & Accept by signing section 5.2 of this ITP
Delivery
6.1
Ensure that all inspections and tests are completed, all reports and documentation are available and all results comply with requirements
6.2 6.3
Check tagging/marking is in place, correct and secure Check Delivery Docket completed and forwarded to projects office
Reports/ Checklists
AS4041 Delivery Docket
Inspection Codes Key
Piping Fabrication
H W M
Hold Point Witness Monitor
V D R
Visual Inspection Dimension Inspection Review & Approve Documentation Page 4 of 5
PE WF TR QC
Project Engineer Workshop Foreman Tradesman Quality Inspector
Every item shall be marked and listed on the Delivery Docket
Responsibility ST EX SC
Storeman Inspection/Expeditor Sub-Contractor
Inspection & Test Plan
Contract No. XXXXXXX ITP Number XXXX XXXXX
Authorised: XXXXX XXXXX Date: XXX XXX XXX
Piping Fabrication No.
Operation Document Number
6.4
6.5
6.6
7.0 7.1
Ensure that all items are loaded with sufficient dunnaging to allow safe transport and unloading and prevent damage to material and surface coatings Weights and dimensions of the load shall comply with statutory requirements. Compliance is the responsibility of the approved transport contractor Deliver product and documentation to nominated location
Standard, Spec or Drawing
Verifying Document/ Report
Inspection
Remarks
Response .
Workshop Fabricator
Fabricato r
Client
Ex
M
M
M
Ex
M
M
M
Contract/ Purchase Order
D/Dkt
Ex/PE
R
R
R
AS4041 SEP.70
MDR Records
PE/QC
R
R
R/H
(May be used as a sign off column by xxxxxxxxxxx or the Client to indicate that the activity has been satisfactorily completed)
Records Project Quality Plan
Check MDR complete and available.
Inspection Codes Key
Piping Fabrication
H W M
Hold Point Witness Monitor
V D R
Visual Inspection Dimension Inspection Review & Approve Documentation Page 5 of 5
PE WF TR QC
Project Engineer Workshop Foreman Tradesman Quality Inspector
MPDJV Rep to review completed MDR at source (MEA or Subcontractor facility) covering SOW
Responsibility ST EX SC
Storeman Inspection/Expeditor Sub-Contractor