Shut down report
Kiln shutdown Report September-2019 Wadi El Nile Cement Company,
Egypt
Prepared by:
P.M department
Date:
September 2019
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
Table of Contents .................................................................................................................................. 1
Crusher Inspection Findings ....................................................................... 3 Raw Mill Area.............................................................................................. 4 2.1 2.2 2.3 2.4 2.5 2.6
321.SR150 ................................................................................................ 4 321.RM100 ................................................................................................ 5 311.WF150 ................................................................................................ 5 Main EP 331.EP300 ..................................................................................... 6 ID Fan 331.FN110 ...................................................................................... 6 Bucket Elevator 341.BE050.......................................................................... 7 Kiln Area ..................................................................................................... 8
3.1 3.2
Bucket Elevator 351.BE340.......................................................................... 8 Rotary Kiln 431.KL100 ................................................................................ 8 Cooler Area (441.CC100) ............................................................................ 9
4.1 4.2 4.3
Static Grate ............................................................................................... 9 Chamber ..................................................................................................10 451.EP200 ................................................................................................11 Coal Mill Area............................................................................................ 12
5.1 5.2
461.SR150 ...............................................................................................12 461.RM100 ...............................................................................................14
Page 2 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
Crusher Inspection Findings
Hammer bolt #2 and #4 have been changed
Wear in the rotor discs has been repaired by welding
Page 3 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
Raw Mill Area 2.1 321.SR150
The 4 worn-out fixed louvers have been changed
The 17 worn-out wear plates have been changed
Page 4 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
2.2 321.RM100
Cracked clamp in roller 1,2 and 3 have been changed
2.3 311.WF150
40 lamellas have been changed
Page 5 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
2.4 Main EP 331.EP300
Short has been removed by extracting 6 electrodes
2.5 ID Fan 331.FN110
Impeller has been cleaned
Page 6 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
2.6 Bucket Elevator 341.BE050
Drive drum lagging has been changed
Driven Drum bearings have been changed
Page 7 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
Kiln Area 3.1 Bucket Elevator 351.BE340
Drive drum lagging has been changed
3.2 Rotary Kiln 431.KL100
Inlet lamella seal wear plate measurements
Measured Value (mm)
Reference Value
4.52 4.58 4.55 4.55
6 mm
5.01 5.29 4.13
Girth gear pins #1, #2 and #12 have been changed
Oil seals for H.S.S have been changed for drive A and drive B
Page 8 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
Cooler Area (441.CC100) 4.1 Static Grate
Air blaster nozzles are worn-out
Page 9 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
4.2 Chamber worn-out crossbars have been changed
CCR Side
Reclaimer Side
Key
Description
L
Loose Crossbars
X
Missing or worn-out crossbars
Quantity
Status
28
Done
9
Done
Page 10 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
4.3 451.EP200
The two worn-out collecting plates have been repaired
There are two worn-out hammers at the inlet chamber and at chamber 4
Page 11 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
Coal Mill Area 5.1 461.SR150
Worn-out rotor has been changed
7 worn-out wear plates have been changed
Page 12 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
The worn-out guide ring has been changed
The worn-out top seal has been changed
The worn-out densite at the reject cone has been repaired
September 2019
Page 13 of 14
Wadi El Nile Cement Company, Egypt Inspection findings Report
September 2019
5.2 461.RM100
Worn-out wear tube for roller #3 piston has been changed
Worn-out air seal for roller #3 (dam ring side) has been changed
Page 14 of 14