LINN Energy - Amine Sweetening Unit Major Equipment List 1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

Pressure Vessels Rev

Tag No.

Description

No of Items

DXL

Type

ft x ft A

MDB-100

2x5

3 Phase

Design Conditions Pressure Temperature PSIG

°F

125.00

200

Amine Flash Tank

1

A

Amine Reboiler

1

2 Phase

A

Inlet Gas Scrubber

1

2 Phase

A

Amine Stripping Condenser

1

3 Phase

No of Items

Size / Bay

Forced/ Induced

Duty

Bare Surface

W x L (ft)

Type

MMBtu/hr

ft2

500

Air Coolers Rev

Tag No.

Description

A

Reflux Cooler

1

Forced

0.093

A

Lean Amine Cooler

1

Forced

0.170

Type

Duty

Heat Exchangers Rev.

Tag No.

261421300.xlsx

Description

No of Items

Size/shell

Equipment Summary

Surface Area

1 of 18

LINN Energy - Amine Sweetening Unit Major Equipment List 1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

Rev.

No of Items

Type L (ft) x D (in)

A

Lean/Rich Amine Exchanger

MMBtu/hr

1

ft2/shell

0.151

Columns Rev.

Tag No.

Description

No of Items

Height 50 S/S

Diameter

Trays/Packing Type

12 in

Structured Pkg

Stage Height

ft A

Amine/Gas Contactor

1

A

Amine Stripper

1

261421300.xlsx

Equipment Summary

2 of 18

LINN Energy - Amine Sweetening Unit Major Equipment List 1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

Pumps, Compressors, and Drivers

Rev

Tag No.

Description

No of Items

Type

Fluid

Density (lb/ft3)

Differential Pressure

@ Suction

psi

A

Amine Circulation Pumps

TBD

Centrifugal

Amine/Water

40

A

Amine Relux Pumps

TBD

Centrifugal

Amine/Water

90

A

Amine Booster Pumps

TBD

Cenrifugal

Amine/Water

55

A

Amine Compressor

1

Recip / 3 St

Nat. Gas

360

Description

No of Items

Associated Equipment

Amine LCV Amine LCV Lean Amine FCV Rich Amine LCV HC LCV GAS Press. Regs TCV

1 1 1 1 1 2 1

Scrubber Contactor Contactor Flash Tk Flash Tk Flash Tk Reboiler

Control Valves, Regulators, & Pressure Safety Valves Rev

Tag No.

A A A A A A A

261421300.xlsx

Equipment Summary

BodySize

Inlet/Outlet Line Size

Flow Low

3 of 18

LINN Energy - Amine Sweetening Unit Major Equipment List 1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

A A A A A A

LCV Amine LCV Air Cooler Louvers Ctrl Scrubber PSV Contactor PSV Flash Tk PSV

1 1 TBD 1 1 1

Stripper Condenser Air Coolers Scrubber Contactor Flash Tk

A

Lean/Rich Amine PSV

2

Lean/Rich HEX

A

Stripper PSV

1

Stripper

261421300.xlsx

Equipment Summary

4 of 18

LINN Energy - Amine Sweetening Unit Major Equipment List 1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

Packaged Systems, Miscellaneous and Associated Equipment Rev

Tag No.

Description

No of Items 1

A

B-100

Burner/Firetube for Amine Reboiler

A

B-101

Steam Bundle for Reboiler

A A A

F-100 F-200 F-300

Rich Amine Filters Lean Amine Filer Lean Amine Filter

2 1 1

A

F-400

Lean Amine Polishing Filter

1

Size

Type

Capacity

Fluid

Storage Tanks Rev

Tag No.

Description

No of Items

Size, Each ft x ft

A

Type

Capacity bbl

Design Conditions Pressure PSIG

Amine Storage Tank

Notes 1

Amine Reboiler can use Steam Coil or Burner with firetube. Recommend Steam Coil option if steam is available to reduce potential Amine degradation. (Tags: B-100, B101)

261421300.xlsx

Equipment Summary

5 of 18

LINN Energy - Amine Sweetening Unit Major Equipment List 1.9MMSCFD, SG=0.82, 0.43%H2S,1.49% CO2

2 3

261421300.xlsx

Equipment Summary

6 of 18

e Sweetening Unit ment List 0.43%H2S,1.49% CO2

MDMT Temperature

Materials Shell/Heads

°F -20

REV NO.

REVISION

BY

A

FOR APPROVAL (RFQ)

DBR

Material Thickness Internal

Shell

Heads

SA-516-70

Tube Side

Design Conditions Pressure Temperature

Bays

CHK

Insulation

Insulation

Vessel Weight

Material

Thickness

lbs

N/A

N/A

Total Fan Drive Power

bhp

bhp

bhp

Fan

Bay

Connection Rating 150 # FLG

Driver per Fan

Fans per

APP

Connection Rating

Fluid

psig

°F

Sour Amine

230

300

TBD

TBD

TBD

TBD

TBD

150# FLG

Amine/Water

230

300

TBD

TBD

TBD

TBD

TBD

150# FLG

Tube

Design Pressure Shell Tube

Tube Flow

Shell Flow

Connection Rating

Fluid Shell

261421300.xlsx

Design Temperature Shell Tube

Equipment Summary

7 of 18

e Sweetening Unit ment List 0.43%H2S,1.49% CO2

Lean Amine

Rich Amine

ft

261421300.xlsx

REVISION

BY

A

FOR APPROVAL (RFQ)

DBR

psig

psig

TBD

TBD

Materials Stage Height

REV NO.

°F

Material Thickness Heads

°F

lb/hr

Design Press/Temp Reboiler Column

Shell/Heads

Internal

Shell

psig/°F

psig/°F

CS

SST

1

N/A

500/300

CS

SST

0.5

TBD

TBD

Equipment Summary

CHK

lb/hr

APP

Connection Rating

Connection Rating

8 of 18

e Sweetening Unit ment List 0.43%H2S,1.49% CO2

REV NO.

REVISION

BY

A

FOR APPROVAL (RFQ)

DBR

Operating Normal Flow

Rated Flow

Temp

Shaft power

Efficiency

°F

bhp

%

TYPE

## gpm

Electric Motor

## gpm

## gpm

Electric Motor

## gpm

## gpm

Electric Motor

1.9 MMSCFD

## MMSCFD

High

Units

56/85/86

Differential Pressure psi

APP

DRIVER

## gpm

Flow

CHK

Gas Engine

Design Conditions Pressure Temperature PSIG

°F

Connection Rating

HP

380

Controlling Device

Connection Rating

Level XMTR Level XMTR Flow XMTR Level XMTR Level XMTR N/A Temp XMTR

261421300.xlsx

Equipment Summary

9 of 18

e Sweetening Unit ment List 0.43%H2S,1.49% CO2

REV NO.

REVISION

BY

A

FOR APPROVAL (RFQ)

DBR

CHK

APP

Level XMTR Level XMTR Temp XMTR N/A N/A N/A N/A N/A

261421300.xlsx

Equipment Summary

10 of 18

e Sweetening Unit ment List 0.43%H2S,1.49% CO2

Design Conditions Pressure Temperature PSIG °F

Installed HP

REV NO.

REVISION

BY

A

FOR APPROVAL (RFQ)

DBR

Weight lbs

Estimated Power hp

CHK

APP

Associated Equipment

Connection Rating

Amine Reboiler Amine Reboiler

Design Conditions Temperature °F

MDMT Temperature °F

Material

N/A N/A N/A

N/A N/A N/A

N/A

N/A

Corrosion Allowance

Insulation

inch

Type

Insulation

Insulation Thickness

Weight

Material

in

lbs

Connection Rating

dation. (Tags: B-100, B101)

261421300.xlsx

Equipment Summary

11 of 18

e Sweetening Unit ment List 0.43%H2S,1.49% CO2

261421300.xlsx

REV NO.

REVISION

BY

A

FOR APPROVAL (RFQ)

DBR

Equipment Summary

CHK

APP

12 of 18

DATE 2/7/2014

REMARKS Horizontal SEE MISC EQ TAG B-100 & B-101 Horizontal

Remarks SST Tubes 150# Rating CS Tubes 150# Rating

REMARKS

261421300.xlsx

Equipment Summary

13 of 18

DATE 2/7/2014

REMARKS

REMARKS

261421300.xlsx

Equipment Summary

14 of 18

DATE 2/7/2014

REMARKS

TBD X TBD% Pumps TBD X TBD% Pumps TBD X TBD% Pumps

REMARKS

261421300.xlsx

Equipment Summary

15 of 18

DATE 2/7/2014

261421300.xlsx

Equipment Summary

16 of 18

DATE 2/7/2014

REMARKS

REMARKS

261421300.xlsx

Equipment Summary

17 of 18

DATE 2/7/2014

261421300.xlsx

Equipment Summary

18 of 18

Related Documents


More Documents from "Dangol"