Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 1 of 11

Master Document List

00

15.Sep.2012

Issued for Comment

REN

SAS

Rev.

Date

Description

Prepared

Checked

Approved

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 2 of 11

Tabulation of Revised Pages Rev

Rev 00

Page 1 2 3 4 5 6 7 8 9 10 11

X X X X X X X X X X X

01

02

03

04

05

00 Page 41 42 43 44 45 46 47 48 49 50 51

12

52

13

53

14

54

15

55

16

56

17

57

18

58

19

59

20

60

21

61

22

62

23

63

24

64

25

65

26

66

27

67

28

68

29

69

30

70

31

71

32

72

33

73

34

74

35

75

36

76

37

77

38

78

39

79

40

80

01

02

03

04

05

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 3 of 11

1. General Documents Item

Document Name

Document Number

1-1

Master Document List

B-PM-LST-101-E-00

1-2

Coordination Procedure

B-PM-PCD-101-E-00

1-3

Numbering and Coding Procedure

B-PM-PCD-102-E-00

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 4 of 11

2. Process Documents Item

Document Name

Document Number

2.1

Design Basis

B-PS-CDB-101-E-00

2.2

Process Description

B-PS-SPC-101-E-00

2.3

Process Design Criteria

B-PS-CRT-101-E-00

2.4

Heat and Material Balance Table

B-PS-CAL-101-E-00

2.5

Utility Consumption List

B-PS-LST-101-E-00

2.6

Relief and BlowDown Summary List

B-PS-LST-102-E-00

2.7

Equipment List

B-PS-LST-103-E-00

2.8

Tie-in Point List

B-PS-LST-104-E-00

2.9

Cause and Effect List

B-PS-LST-105-E-00

2.10

Process Data Sheet for V-101

B-PS-DAS-101-E-00

2.11

Process Data Sheet for E-101

B-PS-DAS-102-E-00

2.12

Process Data Sheet for P-101

B-PS-DAS-103-E-00

2.13

Process Data Sheet for P-102

B-PS-DAS-104-E-00

2.14

Process Data Sheet for C-101

B-PS-DAS-105-E-00

2.15

Process Flow Diagram(PFD)

B-PS-DWG-101-D-00

2.16

Piping and Instrumentation Diagram(P&ID)

B-PS-DWG-102-D-00

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 5 of 11

3. Instrumentation Documents Item

Document Name

Document Number

3.1

Specification For Field Instrument

B-IN-SPC-101-E-00

3.2

Specification For Process Control System

B-IN-SPC-102-E-00

3.3

Specification for Instrument Cable

B-IN-SPC-103-E-00

3.4

Specification for Instrument Installation

B-IN-SPC-104-E-00

3.5

Instrument Index

B-IN-INX-101-D-00

3.6

Design Criteria for Instrumentation & Control

B-IN-CRT-101-E-00

3.7

I/O List

B-IN-LST-101-E-00

3.8

Preliminary Instrument Material Take-Off List

B-IN-MTO-101-E-00

3.9

Control Valves Data Sheet

B-IN-DAS-101-E-00

3.10

On/Off Valves Data Sheet

B-IN-DAS-102-E-00

3.11

Safety/Relief Valve Data Sheets

B-IN-DAS-103-E-00

3.12

Pressure Gauge Data Sheet

B-IN-DAS-104-E-00

3.13

Pressure Transmitter Data Sheet

B-IN-DAS-105-E-00

3.14

Temperature Gauge Data Sheet

B-IN-DAS-106-E-00

3.15

Temperature Transmitter Data Sheet

B-IN-DAS-107-E-00

3.16

Flow Meter Data Sheet

B-IN-DAS-108-E-00

3.17

Other Instrumentation Data Sheet

B-IN-DAS-109-E-00

3.18

Instrument Typical Hook Up Diagram

B-IN-DWG-101-E-00

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 6 of 11

4. Electrical Documents Item

Document Name

4.1

Specification of Electrical Requirement of Package unit

Document Number B-EE-SPC-101-E-00

4.2

Electrical Design Criteria

B-EE-CRT-101-E-00

4.3

Electrical Load Summary

B-EE-LST-101-E-00

4.4

Electrical Equipment List

B-EE-LST-102-E-00

4.5

General Single Line Diagram

B-EE-DWG-101-D-00

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 7 of 11

5. Mechanical Documents Item

Document Name

Document Number

5.1

Specification for Pressure Vessels

B-FE-SPC-101-E-00

5.2

Specification for Centrifugal Pumps

B-RE-SPC-101-E-00

5.3

Material Take Off

B-FE-MTO-101-E-00

5.4

Mechanical Data Sheet for Vessels

B-FE-DAS-101-E-00

5.5

Mechanical Data Sheet for Air Cooler

B-FE-DAS-102-E-00

5.6

Mechanical Data Sheet for Pumps

B-RE-DAS-101-E-00

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 8 of 11

6. Piping Documents Item

Document Name

Document Number

6.1

Piping Material Specification

B-PD-SPC-101-E-00

6.2

Specification for Hot and Cold Insulation

B-PD-SPC-102-E-00

6.3

Specification for Painting

B-PD-SPC-103-E-00

6.4

Specification for Pressure Test

B-PD-SPC-104-E-00

6.5

Specification for Welding Piping

B-PD-SPC-105-E-00

6.6

Piping Line List

B-PD-LST-101-E-00

6.7

Piping Material Take-Off

B-PD-MTO-101-E-00

6.8

Overall Plot Plan

B-PD-DWG-101-D-00

6.9

Piping Standard Drawings

B-PD-DWG-102-D-00

6.10

Main Pipe Rout for Process Section

B-PD-DWG-103-D-00

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 9 of 11

7. Civil and Structural Documents Item

Document Name

7.1

Specification for Structural Steel Design, Fabrication and Erection

Document Number B-SE-SPC-101-E-00

7.2

Civil/Structure Design Criteria

B-SE-CRT-101-E-00

7.3

Preliminary Structure Material Take Off

B-SE-MTO-101-E-00

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 10 of 11

8. Safety Documents Item

Document Name

Document Number

8.1

Safety Concept

B-SA-SPC-101-E-00

8.2

Hazard Source List

B-SA-LST-101-E-00

8.3

HSE Plan

B-SA-PCD-101-E-00

Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column

I.R.D.C.I.

Master Document List

‫ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان‬

(Unit7100)

‫ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ‬

Design Phase: Basic Rev: 00

Project No: 280374 Document No: B-PM-LST-101-E-00

Page 11 of 11

9. Tender Document Item

Document Name

Document Number

9.1

Tender Document

B-TD-TBE-101-E-00

Related Documents

Master Document List(2)
February 2021 1
00 Master Document-koy