Loading documents preview...
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 1 of 11
Master Document List
00
15.Sep.2012
Issued for Comment
REN
SAS
Rev.
Date
Description
Prepared
Checked
Approved
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 2 of 11
Tabulation of Revised Pages Rev
Rev 00
Page 1 2 3 4 5 6 7 8 9 10 11
X X X X X X X X X X X
01
02
03
04
05
00 Page 41 42 43 44 45 46 47 48 49 50 51
12
52
13
53
14
54
15
55
16
56
17
57
18
58
19
59
20
60
21
61
22
62
23
63
24
64
25
65
26
66
27
67
28
68
29
69
30
70
31
71
32
72
33
73
34
74
35
75
36
76
37
77
38
78
39
79
40
80
01
02
03
04
05
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 3 of 11
1. General Documents Item
Document Name
Document Number
1-1
Master Document List
B-PM-LST-101-E-00
1-2
Coordination Procedure
B-PM-PCD-101-E-00
1-3
Numbering and Coding Procedure
B-PM-PCD-102-E-00
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 4 of 11
2. Process Documents Item
Document Name
Document Number
2.1
Design Basis
B-PS-CDB-101-E-00
2.2
Process Description
B-PS-SPC-101-E-00
2.3
Process Design Criteria
B-PS-CRT-101-E-00
2.4
Heat and Material Balance Table
B-PS-CAL-101-E-00
2.5
Utility Consumption List
B-PS-LST-101-E-00
2.6
Relief and BlowDown Summary List
B-PS-LST-102-E-00
2.7
Equipment List
B-PS-LST-103-E-00
2.8
Tie-in Point List
B-PS-LST-104-E-00
2.9
Cause and Effect List
B-PS-LST-105-E-00
2.10
Process Data Sheet for V-101
B-PS-DAS-101-E-00
2.11
Process Data Sheet for E-101
B-PS-DAS-102-E-00
2.12
Process Data Sheet for P-101
B-PS-DAS-103-E-00
2.13
Process Data Sheet for P-102
B-PS-DAS-104-E-00
2.14
Process Data Sheet for C-101
B-PS-DAS-105-E-00
2.15
Process Flow Diagram(PFD)
B-PS-DWG-101-D-00
2.16
Piping and Instrumentation Diagram(P&ID)
B-PS-DWG-102-D-00
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 5 of 11
3. Instrumentation Documents Item
Document Name
Document Number
3.1
Specification For Field Instrument
B-IN-SPC-101-E-00
3.2
Specification For Process Control System
B-IN-SPC-102-E-00
3.3
Specification for Instrument Cable
B-IN-SPC-103-E-00
3.4
Specification for Instrument Installation
B-IN-SPC-104-E-00
3.5
Instrument Index
B-IN-INX-101-D-00
3.6
Design Criteria for Instrumentation & Control
B-IN-CRT-101-E-00
3.7
I/O List
B-IN-LST-101-E-00
3.8
Preliminary Instrument Material Take-Off List
B-IN-MTO-101-E-00
3.9
Control Valves Data Sheet
B-IN-DAS-101-E-00
3.10
On/Off Valves Data Sheet
B-IN-DAS-102-E-00
3.11
Safety/Relief Valve Data Sheets
B-IN-DAS-103-E-00
3.12
Pressure Gauge Data Sheet
B-IN-DAS-104-E-00
3.13
Pressure Transmitter Data Sheet
B-IN-DAS-105-E-00
3.14
Temperature Gauge Data Sheet
B-IN-DAS-106-E-00
3.15
Temperature Transmitter Data Sheet
B-IN-DAS-107-E-00
3.16
Flow Meter Data Sheet
B-IN-DAS-108-E-00
3.17
Other Instrumentation Data Sheet
B-IN-DAS-109-E-00
3.18
Instrument Typical Hook Up Diagram
B-IN-DWG-101-E-00
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 6 of 11
4. Electrical Documents Item
Document Name
4.1
Specification of Electrical Requirement of Package unit
Document Number B-EE-SPC-101-E-00
4.2
Electrical Design Criteria
B-EE-CRT-101-E-00
4.3
Electrical Load Summary
B-EE-LST-101-E-00
4.4
Electrical Equipment List
B-EE-LST-102-E-00
4.5
General Single Line Diagram
B-EE-DWG-101-D-00
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 7 of 11
5. Mechanical Documents Item
Document Name
Document Number
5.1
Specification for Pressure Vessels
B-FE-SPC-101-E-00
5.2
Specification for Centrifugal Pumps
B-RE-SPC-101-E-00
5.3
Material Take Off
B-FE-MTO-101-E-00
5.4
Mechanical Data Sheet for Vessels
B-FE-DAS-101-E-00
5.5
Mechanical Data Sheet for Air Cooler
B-FE-DAS-102-E-00
5.6
Mechanical Data Sheet for Pumps
B-RE-DAS-101-E-00
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 8 of 11
6. Piping Documents Item
Document Name
Document Number
6.1
Piping Material Specification
B-PD-SPC-101-E-00
6.2
Specification for Hot and Cold Insulation
B-PD-SPC-102-E-00
6.3
Specification for Painting
B-PD-SPC-103-E-00
6.4
Specification for Pressure Test
B-PD-SPC-104-E-00
6.5
Specification for Welding Piping
B-PD-SPC-105-E-00
6.6
Piping Line List
B-PD-LST-101-E-00
6.7
Piping Material Take-Off
B-PD-MTO-101-E-00
6.8
Overall Plot Plan
B-PD-DWG-101-D-00
6.9
Piping Standard Drawings
B-PD-DWG-102-D-00
6.10
Main Pipe Rout for Process Section
B-PD-DWG-103-D-00
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 9 of 11
7. Civil and Structural Documents Item
Document Name
7.1
Specification for Structural Steel Design, Fabrication and Erection
Document Number B-SE-SPC-101-E-00
7.2
Civil/Structure Design Criteria
B-SE-CRT-101-E-00
7.3
Preliminary Structure Material Take Off
B-SE-MTO-101-E-00
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 10 of 11
8. Safety Documents Item
Document Name
Document Number
8.1
Safety Concept
B-SA-SPC-101-E-00
8.2
Hazard Source List
B-SA-LST-101-E-00
8.3
HSE Plan
B-SA-PCD-101-E-00
Plant of Removing BTEX Pollution from Vented Vapors of Glycol Regeneration Column
I.R.D.C.I.
Master Document List
ﺷﺮﻛﺖ ﻣﻠﻲ ﮔﺎز اﻳﺮان
(Unit7100)
ﺷﺮﻛﺖ ﭘﺎﻻﻳﺶ ﮔﺎز ﻓﺠﺮ ﺟﻢ
Design Phase: Basic Rev: 00
Project No: 280374 Document No: B-PM-LST-101-E-00
Page 11 of 11
9. Tender Document Item
Document Name
Document Number
9.1
Tender Document
B-TD-TBE-101-E-00