Loading documents preview...
Sample Inspection Report Rev.
Supplier Report No.
Request for Order-No.
Rev.
Report No.
Rev.
Release Plan No.
Rev.
Supplier Address Company Name Street Name
BSH Serial No.
Post Office Box Zip Code
Supplier No.
City
Part Designation
Country
BSH Drawing No.
Production Location Drawing Status
SIR Recipient (please send all sampling documents to following E-Mail address) E-Mail:
Project Quantity Ordered
Change Request (BSH)
Initial Sample Inspection
Subsequent Inspection
Reason for sampling:
Level of Component Q-Qualification:
"C" = Only SIR
New Part
Production Relocation
New Tool
Part Modification
Changed Production Conditions
New Raw Material
New Sub-Supplier
Long Delivery Interruption
Short text stating reason for sampling:
In case of Level A or B please expand the sheet and select the enclosed CQP-items Please select the enclosed items related to this SIR
to be completed by supplier
19
BSH Sample Inspection Report (cover sheet) (Items nr. 11, 18, 19 and 22) a Measuring Report / Dimension Check
c Material Report/ Material Test
e
b Functional Test
d Haptics/ Acoustics/ Odors
f Surface Check
Appearance
g Reliability Test
11 Supplier declaration (RoHS, REACH)
h Other:
18 Machine capability analysis (Cm;Cp)
We confirm, … Supplier Part No. 1. that the presented samples were manufactured under standard conditions using Delivery Note No. standard operation resources, 2. the correct implementation of the sample Supplier's Remarks inspection and recording of the findings in this sample report (all deviations are indicated in this report),
Process capability analysis 22 (Ppk;Cpk)
Delivery Note Date
BSH Tool No.
Quantity Delivered (total)
Number of Tool
Quantity Delivered per Cavity
Number of Cavities
3. that the release of products does not exempt the supplier from his responsibility to deliver the goods in accordance to the respective valid drawing and specification, that we accept and will abide by the rules 4. regarding information and documentation stated in the quality assurance agreement.
Name / Department
Phone & Fax / E-Mail
Decision
Date
Signature
Delivered Quantity Returned Remarks to decision:
###Release Limited Release,
###Quantity/ until Date
#NAME?
###No Release New Samples by (Date)
#NAME? Name / Department
455471246.xlsx Date of print: 01/14/2020
#NAME? Phone & Fax / E-Mail
#NAME? Date
Signature
BSH SIR V14.8 Feb. 2018 BSH SIR COVER SHEET V14.7
Sample Inspection Report CQP Check List CQP-No.
#NAME?
Supplier Report No.
Rev.
#NAME?
Release Plan No.
Rev.
#NAME?
Report-No.
Rev.
#NAME?
QM department
### ### ###
Supplier
#NAME?
Tool-No.
#NAME?
Remark:
Milestones / Synchronisation points for:
Level of Component Q-Qualification
###
Cavities
1
BSH specification
X X X
-
2
Feasibility study
X X
-
3
Tooling/ Capacity Planning
X
-
4
Production Layout
X
-
5
Process flow chart
X
-
6
Control Plan
X
-
7
Preventive Quality Assurance (PQA agreement)
X
-
8
FMEA Product (Design and System)
E
-
9
Design Release
X
-
10
Qualified laboratory documentation
X
-
11
Supplier declaration on prohibited or declarable substances (RoHS, REACH)
X X X
-
12
FMEA Process
E
-
13
Advanced quality planning (APQP)
X
-
14
Packaging specification and concept
X
-
15
List of test/measurement equipment
X
-
16
Measurement System Analysis (MSA)
X
-
17
Approval evidence for purchased parts from sub suppliers
X X
-
18
Machine capability analysis
X
-
19
BSH Sample Inspection Report
X X X
-
a
Measuring report / Dimension check
X X X
-
b
Functional report/ Functional test
c
Material report/ Material test
d
Haptics/ Acoustics/ Odors
-
e
Appearance
-
f
Surface check
-
g
Reliability test
-
h
Other:
-
20
Reference samples
-
21
Process assessment (Audit) (2DP, Run@Rate)
X
-
22
Process capability analysis
X X
-
Production location
#NAME?
Part Designation
Drawing No.
#NAME? #NAME?
Project
#NAME?
BSH Depository
#NAME? #NAME? #NAME?
Independent of the requested items the supplier has to document all applicable records, have to make them available on request and is responsible to ensure the part quality.
Delivery date
A B C
BSH Part Classification
Supplier No.
Prior to placement of order this document has to be agreed between BSH QM and Supplier. The signed component qualification planning has to be send to the responsible BSH QM within 2 weeks after receipt without explicit request. This document is part of the release documents.
Planned date
Item
No.
#NAME?
Serial No.
Comments
-
X
-
23
-
24
-
25
-
additional remark / zusätzliche Bemerkung :
Decision
Release No release
455471246.xlsx Date of print: 01/14/2020
Limited release until Date:
Name (Factory/Dept.):
Date:
Phone:
BSH SIR V14.8 Feb. 2018 BSH CHECK LIST V3.4
Report-No/Nr.:
#NAME?
Supplier:
#NAME?
Drawing No.:
###
Rev.
RP-No./Nr.:
Serial No.:
Rev. Ordering No.:
#NAME?
Part Designation:
#NAME?
#NAME?
Supplier No.:
#NAME?
Drawing Status:
#NAME? Name / Dept.:
Phone:
Incoming No.:
Incoming Date:
Incoming Quantity:
Date:
Signature:
Drawing Status:
Date / Name:
Remark
Development department
Decision
Comment:
Release No Release Limited Release until Date
Part responsible:
Decision
Quality department
Department:
Comment:
Release No Release Limited Release until Date
Test results
Cavity
Responsible:
of
Formnest Item-No.: Drawing Field:
Nominal value
455471246.xlsx Date of print: 01/14/2020
Upper allowed deviation
Department:
Part weight (measured):
Teile-Gewicht: Lower allowed deviation
Additional Information
Actual value (Supplier) 1
2
Actual value (Customer 3
1
BSH SIR V14.8 Feb. 2018 Measuring Report V14.8
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Measuring Report V14.8
Sample Inspection Report Measuring Report
#NAME?
Page:
1
of
#NAME? #NAME? Quantity Ordered:
#NAME?
date:
date:
455471246.xlsx Date of print: 01/14/2020
Modify tool by BSH
2
New target value
Correct tool by supplier
Change Drawing
Actual value (Customer) 3
BSH SIR V14.8 Feb. 2018 Measuring Report V14.8
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Measuring Report V14.8
Report-No/Nr.:
#NAME?
Supplier:
#NAME?
Drawing No.:
Rev.
###
RP-No./Nr.:
Serial No.:
Rev. Ordering No.:
#NAME?
Part Designation:
#NAME?
#NAME?
Supplier No.:
#NAME?
Drawing Status:
#NAME? Name / Dept.:
Incoming No.:
Phone:
#NAME?
Incoming Date:
#NAME?
Incoming Quantity:
#NAME?
Date:
Signature:
Drawing Status:
Date / Name:
#NAME?
Remark
Test results
Cavity
of
Formnest Item-No.: Drawing Field:
Nominal value
455471246.xlsx Date of print: 01/14/2020
Upper allowed deviation
Part weight (measured):
Teile-Gewicht: Lower allowed deviation
Additional Information
Actual value (Supplier) 1
2
Actual value (Custome 3
1
BSH SIR V14.8 Feb. 2018 Measuring Report V14.5
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Measuring Report V14.5
Sample Inspection Report Measuring Report
#NAME?
Page:
of #NAME? #NAME?
Quantity Ordered:
#NAME?
#NAME?
455471246.xlsx Date of print: 01/14/2020
Modify tool by BSH
2
New target value
Correct tool by supplier
Change Drawing
Actual value (Customer) 3
BSH SIR V14.8 Feb. 2018 Measuring Report V14.5
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Measuring Report V14.5
Report-No/Nr.:
#NAME?
Supplier:
#NAME?
Drawing No.:
###
Rev.
RP-No./Nr.:
Serial No.:
Rev. Ordering No.:
#NAME?
Part Designation:
#NAME?
#NAME?
Supplier No.:
#NAME?
Drawing Status:
#NAME? Name / Dept.:
Incoming No.:
Phone:
Incoming Date:
#NAME?
#NAME?
Incoming Quantity:
#NAME?
Date:
Signature:
Drawing Status:
Date / Name:
#NAME?
Remark
Development department
Decision
Comment:
Release No Release Limited Release until Date
Part responsible:
Decision
Quality department
Department:
Comment:
Release No Release Limited Release until Date
Test results
Cavity
Responsible:
of
Formnest Item-No.: Drawing Field:
Nominal value
455471246.xlsx Date of print: 01/14/2020
Upper allowed deviation
Department:
Part weight (measured):
Teile-Gewicht: Lower allowed deviation
Additional Information
Actual value (Supplier) 1
2
Actual value (Customer 3
1
BSH SIR V14.8 Feb. 2018 Measuring Report V14.8
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Measuring Report V14.8
Sample Inspection Report Measuring Report
#NAME?
Page:
1
of
#NAME? #NAME? Quantity Ordered:
#NAME?
#NAME?
date:
date:
455471246.xlsx Date of print: 01/14/2020
Modify tool by BSH
2
New target value
Correct tool by supplier
Change Drawing
Actual value (Customer) 3
BSH SIR V14.8 Feb. 2018 Measuring Report V14.8
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Measuring Report V14.8
Sample Inspection
Report-No/Nr.:
#NAME?
Supplier:
#NAME?
Drawing No.:
RP-No./Nr.:
Rev.
Supplier No.:
Please select type of test:
Quantity Ordered:
Functional Test
Name / Dept.:
Phone:
Incoming Date:
#NAME?
#NAME?
Ordering No.:
#NAME?
#NAME?
Incoming No.:
#NAME?
#NAME?
Part Designation:
#NAME?
Drawing Status:
###
Rev. Serial No.:
#NAME?
Incoming Quantity:
#NAME?
Date:
Signature:
Drawing Status:
Date / Name:
#NAME?
Remark
Development department
Decision
Comment:
Release No Release Limited Release until Date Quality department
Decision
Part responsible:
Department:
Comment:
Release No Release Limited Release until Date
Test results
Responsible:
Cavity Formnest
1
of
Department:
Part weight (measured): Teile-Gewicht:
Item-No.: Drawing Field:
Nominal value
455471246.xlsx Date of print: 01/14/2020
Upper allowed deviation
Lower allowed deviation
Additional Information
Actual value (Supplier) 1
2
Actual value (Customer) 3
1
2
BSH SIR V14.8 Feb. 2018 Other Reports V14.8
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Other Reports V14.8
Sample Inspection Report Page:
1
of
#NAME? #NAME? Quantity Ordered:
#NAME?
#NAME?
date:
date: Modify tool by BSH
New target value
Correct tool by supplier
Change Drawing
Actual value (Customer) 3
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Other Reports V14.8
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Other Reports V14.8
Sample Inspection Repor Components List
Report-No/Nr.: Supplier:
#NAME? #NAME?
Drawing No.:
#NAME?
Name / Dept.:
Incoming No.:
###
Incoming Date:
#NAME? Ordering No.:
#NAME?
Appendices:
#NAME?
#NAM
Supplier No.:
#NAME?
#NAM Quantity Ordered:
Phone:
#NAME?
RP-No./Nr.:
Part Designation:
#NAME?
Drawing Status:
Rev.
Serial No.:
Date:
Incoming Quantity:
#NAME?
Signature:
Drawing Status:
#NAME?
Date / Name:
#NAME
Only to fill out for assembly parts (>1 part) Part-No.
Description
Serial No.
Drawing No.
Drawing Status
Material
complet Colour
Paint
No. of cavities
MPP (Material)
1.
2.
3.
4.
5.
6.
7.
8.
9.
Comments
455471246.xlsx Date of print: 01/14/2020
BSH SIR V14.8 Feb. 2018 Component List V14.5
Sample Inspection Report Components List
#NAME?
Rev. ### #NAME? #NAME? Quantity Ordered:
#NAME?
#NAME?
complete by BSH
455471246.xlsx Date of print: 01/14/2020
MPP
MPP
(Material)
(Measure)
BSH SIR V14.8 Feb. 2018 Component List V14.5
Sample Inspection Report Process Capability Study
Report-No/Nr.:
#NAME?
Supplier:
Serial No.:
#NAME?
Drawing No.:
RP-No./Nr.:
#NAME? Ordering No.:
#NAME?
Part Designation:
#NAME?
Drawing Status:
###
Rev.
#NAME?
Supplier No.:
#NAME?
Appendices
Rev. #NAME?
#NAME? Quantity Ordered:
#NAME?
#NAME?
Name / Dept.:
Incoming No.:
Phone:
#NAME?
Incoming Date:
#NAME?
Date:
Incoming Quantity:
#NAME?
Signature:
Drawing Status:
#NAME?
Date / Name:
#NAME?
Results supplier of process capability
Item
Quantity
Process Stable
Capability Index
Parameter
No.:
Conditions
yes
no
cmk
ppk
cpk
Remark
Remark
Decision affected departments Release:
yes
no
Decision QM Limited until Date:
Release:
yes
no
Limited until Date:
Department:
Date:
455471246.xlsx Date of print: 01/14/2020
Signature:
Date:
Signature:
BSH SIR V14.8 Feb. 2018 Process Capability V14.5
Supplier Code:
Part Description:
#NAME?
Name / Dept.:
V0.1 creation of list
455471246.xlsx Date of print: 01/14/2020
Supplier Name / Dept. / date of change
BSH Name / Dept. / date
Part name
A plastic parts
Remarks
No. of Raw Material
Change / Description
PPN Part Pos. No.
Part Position No. PPN
version of list
Change History
A
Material possibly concerning DIN/ISO
Date:
B
Manufacture of Raw Material
C
Trade Name
Material Report
#NAME?
Drawing Status.:
#NAME?
Phone:
Used Raw Materials for this SIR/MPP have to be blue highlighted!
Drawing No.:
#NAME?
#NAME? Signature:
D
Colour index Farbe (concerning manufacturer)
E
Supplier of Raw Material Lieferant (Material)
F
a. Trade Name, Batch/Varnish/Ink
b. Manufacturer
#NAME?
RP-No/Nr.:
#NAME?
G
Coating / Beschichtung Self-colouring / Selbsteinfärbung Modification / Modifikation
only if deviating to B
Report-No/Nr.:
c. Layer Thickness(µm) or d. Adding Weight (%)
H
EU RoHS compliant without exemptions
yes / no
Yes (X)
Internal working area BSH
I
J
ENVIRONMENT
Tests concerning B/S/H/ delivery specification carried out?
Serial No.:
#NAME?
Does the used substance corrospond to EU-guidline 1935/2004 and/or FDA
Supplier:
Attention! If you have more than one type / variant of a part the Serial No., Drawing No. and Drawing status has not to be filled in.
EU RoHS Directive 2011/65/EU REACH Candidate List EU RoHS EU REACH compliant SVHC with Candidate list exemptions Exemption No.
CAS No.
yes LV.../no
List of Products/ Variants: part name of variant / if needed Material No.
SIR- or RP-no. (first release of this raw material connected to part name) status
A
1 2 3 4 5 6 7 8 9 10
B metal parts
B
1 2 3 4 5 6 7 8 9 10
C rubber parts
C
1 2 3
D oil/resin/paste/grease
D
1 2
E others / mix
E
1 2 3 4 5
BSH SIR V14.8 Feb. 2018 Material Report V5.5
Short description / Explanation of requirements according part classification 1. BSH specification (drawings, test instructions, technical checking directives) BSH specifications like drawings, test instructions, technical checking directives (TCD) in the latest valid version. The supplier has to sign the specification. 2. Feasibility study As part of the contract review the supplier has to check all commercial, logistic and technical specification, like drawings, CAD data, test instruction regarding realization (use of internal check list, technical feasibility studies, capacity planning, cost analysis, packaging requirements, FMEA, … 3. Tooling/Capacity Planning Supplier has to provide a binding statement (based on e.g. excel template) about tooling plans and cavity information, and maximum production rates. The BSH ramp up / disposition plan has to be taken into account when making the time plan. The tooling / capacity plan has to be updated with project progress. 4. Production Layout The Supplier has to provide a chart that shows the planned or already existing production layout. 5. Process flow chart The process flow chart is a simplified presentation of the complete production flow using symbols. It can be a part of the control plan or created in a separate document. Ensure that a clear allocation to the control plan is possible. 6. Control plan A control plan states what should be inspected, when, how, with what and to which extent. It contains important information and quality assurance procedures which are necessary in the course of a production in order to ensure the quality of the final product. The production flow presented in the process flow chart must be reflected in the control plan. The control plan shall mention the emergency plan in case of non conformity parts for each controlled item. 7. Preventive Quality Assurance (PQA agreement) Mutually defined preventive quality assurance measures at suppliers production to ensure the part and process quality. Agreement on measuring equipment/methods, measuring system capability, short term qualification, continuous process monitoring and requalification for identified special characteristics of product and process. Material certification for raw material. Make use of suppliers manufacturing experience to identify critical process steps as well as critical aspects derived from process FMEA. All items has to be evaluated in supplier’s FMEA & has to be considered in supplier’s control plan. 8. FMEA Product (Design and System) Suppliers with development responsibility have to execute a Product FMEA. The Product FMEA remains with the supplier and has to be shown to BSH on request. 9. Design Release If the supplier has the development responsibility the release has to be checked by BSH R&D. 10. Qualified laboratory documentation Laboratory accreditation or concession by BSH: All external laboratories must be accredited to ISO/IEC 17025. The scope of accreditation must correspond to the tests performed. If internal or not accredited laboratories are used, the supplier must submit a concession to BSH previously. 11. Supplier declaration on prohibited or declarable substances (RoHS, REACH) RoHS/REACH declaration 12. Process FMEA The Process FMEA (P-FMEA) is prepared based on the results of the Product FMEA and evaluates potential weaknesses in the production process. The Process FMEA remains with the supplier and has to be shown to BSH on request. 13. Advanced product quality planning (APQP)
BSH SIR V14.6 Nov. 2017
All quality supporting measures in the project are scheduled and documented in the advanced product quality plan (e.g. all CQP items, internal test reviews). The applied test depends on the specific product and project requirements. The advanced quality plan defines the necessary measures to fulfill the customer requirements 14. Packaging specification and concept The packaging will be evaluated regarding its ability to meet the quality specific requirements and released within the sampling phase. 15. List of test/measurement equipment The supplier has to provide a list which shows the part specific test/measurement equipment. 16. Measurement System Analysis (MSA), Gauge R&R The supplier has to provide a MSA study. Analyze the ability of gauges und complete measurement systems regarding accuracy, repeatability, reproducible, stability and linearity. 17. Approval evidence for purchased parts from sub suppliers Initial sample inspection report (ISIR), material certification, process assessment, etc. 18. Machine capability analysis BSH presumes a machine capability index (Cmk) ≥ 1, 67 BSH requirements for process capability specifics can be found in the Leaflet on sampling on the BSH Homepage. https://media3.bsh-group.com/Documents/MCDOC02042899_Leaflet-Sampling.pdf To determine the machine capability index, the template Optional template for cpk calculation posted on the BSH homepage www.bsh-group.com can be used. https://media3.bsh-group.com/Documents/MCDOC02055306_Statistische-Berechnung-Erstmusterpruefung.xls 19. BSH Sample Inspection Report The BSH SIR is an element of the part qualification planning and shall be submitted to the responsible BSH-QM organization regardless of any part qualification BSH Sample Inspection Report (SIR) Test results (a) dimension, b) function, c) material, d) haptics, acoustics, odors, e) appearance, f) surface check, g) reliability Measurement report included in ISIR, contains the significant characteristics, such as supplier number, test report number and characteristics of sample parts as well as the detailed test reports for drawings (dimensions, text,…), for material (material certificates) and for other agreed characteristics (appearance, haptics, surface, function, reliability, approval tests …). 20. Reference Samples At least one sample fulfilling BSH Quality requirements must be kept by the supplier during the product life. Limit samples e.g. for colors, surface etc. must be marked in a traceable way. 21. Process assessment at the supplier Integral part of the component qualification planning for complex parts with submission level A. Process assessment under serial condition at the supplier (or if agreed also at sub suppliers) as final step for the part release. 22. Process capability analysis For regular production, BSH expects a process capability index (cpk) ≥1,33 and optional for release of production a preliminary process capability index (ppk) ≥1,67 BSH requirements for process capability specifics can be found in the Leaflet on sampling on the BSH Homepage https://media3.bsh-group.com/Documents/MCDOC02042899_Leaflet-Sampling.pdf To determine the process capability index, the template optional template for cpk calculation posted on the BSH homepage can be used. https://media3.bsh-group.com/Documents/MCDOC02055306_Statistische-Berechnung-Erstmusterpruefung.xls
BSH SIR V14.6 Nov. 2017
List of Factories (Reference to Sheet "MPB coversheet Deckblatt" coulumns X to AA) Px
Address
Applic.
PCG
BSH Ikiakes syskeyes ABE 8 Parnassou, GR 18233 Athens, Greece
Cookers
PCG
Neff GmbH Ruiterstr. 8, 75015 Bretten, Germany
Cookers / Extractor Hoods
PCG
BSH Electrodomésticos S.A.C. , Av. Elmer Faucett no. 3551, C01 Callao-Lima, Peru
Cookers
PCG
BSH Home Appliances Corporation 130 Memorial Drive, La Folette, TN 37766, USA
Cookers
PCG
BSH Ev Aletleri Sanayi ve Ticaret A.S. Fevzi Pasa Mah. Batur Sokak, 59501 Cerkezkoy, Turkey
Cookers
PCG
Gaggenau Industrie S.A.S. Rue Baudelaire - Lipsheim, F-67412 Illkirch Cedex, France
Cookers
PCG
BSH Electrodomésticos España S.A. Avda. de la Industria 49, 50016 Montanana, Spain
Cookers
PCG
BSH Electrical Appliances (Jiangsu) Co. Ltd. No. 1 Ximenzi Road, Nanjing, 210046 Jiangsu, P.R. China
Hobs / Extractor Hoods
PCG
BSH Home Appliances Corporation 100 Bosch Blvd, New Bern, NC 28562, USA
Ranges
PCG
BSH Home Appliances Corporation 100 Bosch Blvd, New Bern, NC 28562, USA
Cook Tops / Ventilation
PCG
BSH Electrodomésticos España S.A. Avda. Eduardo Garcia 30, 39011 Santander, Spain
Cookers
PCG
BSH Hausgeräte GmbH Werner-von-Siemens-Str. 200, 83301 Traunreut, Germany
Cookers / Microwaves
PCG
BSH Sprzet Gospodarstwa Domowego Sp. z o.o. ul. Żmigrodzka 143, 51-130 Wrocław, Poland
Cookers
PCP
BSH Hausgeräte GmbH Industriestr. 1, 97616 Bad Neustadt, Germany
Small Appliances
PCP
BSH Ev Aletleri Sanayi ve Ticaret A.S. Fevzi Pasa Mah. Batur Sokak, 59501 Cerkezköy, Tekirdag-Turkey
Small Appliances
PCP
BSH Hišni Aparati, d.o.o. Nazarje Savinjska cesta 30, SLO-3331 Nazarje, Slovenia
Small Appliances
PCP
BSH Electrical Appliances (Jiangsu) Co. Ltd. No. 1 Ximenzi Road, Nanjing, 210046 Jiangsu, P.R. China
Small Appliances
PCP
BSH Hausgeräte GmbH Werner-von-Siemens-Str. 200, 83301 Traunreut, Germany
Hot-water Appliances
PCP
BSH Electrodomésticos España S.A. Vitorialanda, 14 Polig. Ali-Gobeo, 01010 Vitoria, Spain BSH Sprzęt Gospodarstwa Domowego Sp. z o.o._x000D_ Rogoźnica 300 36060 Głogów Małopolski_x000D_ Poland
Small Appliances
BSH Hausgeräte GmbH Werner-von-Siemens-Str. 200, 83301 Traunreut, Germany
Beverage
PCP
PCP
PDC
BSH Hausgeräte GmbH Robert-Bosch-Straße 16 89407 Dillingen a.d.Donau, Germany
Small Appliances
Dishwasher
PDC
BSH Hausgeräte GmbH Robert-Bosch-Str. 16, 89407 Dillingen, Germany
Dishwasher
PDC
BSH Electrodomésticos España S.A. Carretera Tafalla 17, 31232 Villatuerta (Estella), Spain
Dishwasher
PCP
BSH Electrodomésticos España S.A. Carretera Tafalla 17, 31232 Villatuerta (Estella), Spain
Gas Heater / Air Conditioner / Shirt Ironer / Dehumidifier
PDC
BSH Ev Aletleri Sanayi ve Ticaret A.S. Fevzi Pasa Mah. Batur Sokak, 59501 Cerkezkoy, Turkey
Dishwasher
PDC
BSH Sprzet Gospodarstwa Domowego Sp. z o.o. ul. Papiernicza 7, 92-312 Lodz, Poland
Dishwasher
PDC
BSH Electrodomésticos España S.A. Avda. de la Industria 49, 50016 Montanana, Spain
Dishwasher
PDC
BSH Home Appliances Corporation 100 Bosch Boulevard, NC 28562 New Bern, USA
Dishwasher
PDC
BSH Home Appliances Co., Ltd. No. 1 Century Avenue, Chuzhou Economic & Technological Development Zone, Chuzhou, Anhui, P.R. China
Dishwasher
EDS
BSH Drives and Pumps s.r.o. Továrenská 2, SK-07190 Michalovce, Slovakia
Drives
EDS
BSH Electrical Appliances (Jiangsu) Co. Ltd. No. 129 Zhongshan Road, Nanjing, 210005 Jiangsu, P.R. China
Drives
EDS
BSH Hausgeräte GmbH Im Gewerbepark B30/B35, 93059 Regensburg, Germany
Drives
PLC
BSH Hausgeräte GmbH Wohlrabedamm 15 13629 Berlin, Germany
Laundry
PLC
BSH Electrodomésticos España S.A. Crta. Castellón s/n, 50720 La Cartuja, Spain
Laundry
PLC
BSH Household Appliances Manufacturing Private Ltd. Plot No: S 45, SIPCOT Industrial Park, Pillaipakam, Vengadu Village, Kanchipuram, Tamilnadu - 602 105. India
Laundry
PLC
BSH Sprzet Gospodarstwa Domowego Sp. z o.o. ul. Wedmanowej 10, 93-228 Lodz, Poland
Laundry
PLC
BSH Ev Aletleri Sanayi ve Ticaret A.S. Fevzi Pasa Mah. Batur Sokak, 59501 Cerkezkoy, Turkey
Laundry
PLC
BSH Sprzet Gospodarstwa Domowego Sp. z o.o. ul. Papiernicza 7, 92-312 Lodz, Poland
Laundry
PLC
BSH Hausgerätewerk Nauen GmbH Siemensring 5-9, 14641 Nauen, Germany
Laundry
PLC
BSH Electrical Appliances (Jiangsu) Co. Ltd. No. 1 Ximenzi Road, Nanjing, 210046 Jiangsu, P.R. China
Laundry
PLC
PLC
OOO BSH Bytowije Pribory 198515, -Saint.- Petersburg Peterhof, Karl Siemens st., 1, build., -A Russia BSH Electrical Appliances (Jiangsu) Co. Ltd. No.3 Wanh Zhuang Road, Wuxi, 214028 Jiangsu, P.R. China
Laundry
Laundry
PRF
BSH Home Appliances Co. Ltd. No. 1 Siemens Road, 239016 Chuzhou, Anhui, P.R. China
Refrigeration
PRF
BSH Home Appliances Co. Ltd. No. 1 Siemens Road, 239016 Chuzhou, Anhui, P.R. China
Refrigeration
PRF
BSH Electrodomésticos S.A.C. Av. Elmer Faucett no. 3551, C01 Callao-Lima, Peru
Refrigeration
PRF
BSH Electrodomésticos España S.A. Camino de Mendi s/n, 31991 Esquiroz, Spain
Refrigeration
PRF
BSH Hausgeräte GmbH Robert-Bosch-Str. 100, 89537 Giengen, Germany
Refrigeration
PRF
BSH Ev Aletleri Sanayi ve Ticaret A.S. Fevzi Pasa Mah. Batur Sokak, 59501 Cerkezkoy, Turkey
Refrigeration
PRF
BSH Ev Aletleri Sanayi ve Ticaret A.S. Fevzi Pasa Mah. Batur Sokak, 59501 Cerkezköy, Tekirdag-Turkey OOO BSH Bytowye Pribory 198515 St.Petersburg, Petrodvorets, Karl Siemens St.1, bld. А , Russia
Refrigeration
PRF
Refrigeration
PRF
BSH Sprzet Gospodarstwa Domowego Sp. z o.o. ul. Żmigrodzka 143, 51-130 Wrocław, Poland
Refrigeration
ulumns X to AA) Abbrv.
FCGA
FCGB
FCGCa
FCGF
FCGI
FCGL
FCGM
FCGNa
FCGNb
FCGNb (2)
FCGS
FCGT
FCGWr
FCPB
FCPI
FCPN
FCPNa
FCPT
FCPV
FCPR
PCP/TE-TPB
PDC
FDCD
FDCE
FDCE
FDCI
FDCL
FDCM
FDCNb
FDCCh
FEDM
FEDNa
PED
PLC
FLCC
FLCCn
FLCD
FLCI
FLCL
FLCN
FLCNa
FLCP
FLCW
FRFC1
FRFC2
FRFCa
FRFE
FRFG
FRFI1
FRFI2
FRFP
FRFWr