PRESSURE VESSEL INSPECTION STAGES
SL NO.
INSPECTION STAGES
PERCENTAGE
1
PIM
2
2
DOCUMENTS APPROVAL
5
3
INWARD INSPECTION
10
4
DISHEND FORMING INSPECTION
5
4.1 4.2 4.3 4.4 4.5
Fitup Inspection of Blank Plates (if Welding applicable) Forming Monitoring Visual & Dimensional Inspection NDT Witness/Monitor/Review(As per Standards Requirement & Client Specification ) Mechanical Testing (If appicable)
1 1 1 1 1
5
SHELL ( LONG & CIRCULAR SEAM)
10
5.1 5.2 5.3 5.4
Fitup Inspection of Shell Long Seam/ Circ.Seam Welding Monitoring Visual & Dimensional inspection NDT Witness/Monitor/Review(As per Standards Requirement & Client Specification ) NOZZLE PREPARATION
2 2 3 3
Fitup inspection Nozzle Long Seam & Circ Seam (if applicable) Monitoring of Nozzle Weding (Long Seam & Circ. Seam) NDT Witness/Monitor/Review(As per Standards Requirement & Client Specification ) NOZZLE INSTALLATION
1 2 2
Nozzle opening Inspection NDT for Nozzle openings Fitup inspection of Nozzle to shell/Dish Monitoring of Nozzle Weding to shell/Dish Visual & Dimensional inspection NDT Witness/Monitor/Review(As per Standards Requirement & Client Specification ) Pneumatic Test for RF Pads ( If Applicable) DISHEND TO SHELL INSTALLATION
1 1 1 1 2 1 1
6 6.1 6.2 6.3 7 7.1 7.2 7.3 7.4 7.5 7.6 7.7 8 8.1 8.2 8.3 8.4
5
8
6.5 1 1 2.5 2
9
Fitup inspection Dishend to shell Monitoring of Welding activities Visual & Dimensional inspection NDT Witness/Monitor/Review(As per Standards Requirement & Client Specification ) INTERNALS INSTALLATION
9.1 9.2 9.3 9.4
Fitup inspection of internals Monitoring of Welding activities Visual & Dimensional inspection NDT Witness/Monitor/Review(As per Standards Requirement & Client Specification )
0.5 0.5 1 1
10
PWHT (IF APPLICABLE)
4
10.1 10.2
Verifying the Thermocouples as per Approved Procedure Monitoring the Heat treatment process as per approved Procedure
1 1.5
3
10.3
Review of PWHT Chart
1.5
11
NDT AFTER PWHT
5
11.1
NDT Witness/Monitor/Review(As per Standards Requirement & Client Specification ) FINAL VISUAL & DIMENSIONAL INSPECTION
11
12 12.1 12.2
5
Verification of overall vessel Visual & Dimensional inspection Review of all inspection stages reports in order to proceed for Pressure Test PRESSURE TEST ( HYDROSTATIC TEST / PNEUMATIC TEST)
6 5 0.5 3 0.5 1 1
14
Monitoring the preparation process for pressure test Witnessing the pressure test as per code & Client Requirements Monitoring the Draining / Cleaning Process after Pressure Test NDT Witness/Monitor/Review(As per Standards Requirement & Client Specification ) Review of Pressure Test Reports PAINTING
14.1 14.2 14.3 14.4 14.5 14.6
Surface Preparation & Blasting Inspection Salt contamination Check,Surface profile & Dust Grade check After Checking Dew point , Humidity & Climate conditions releasing for further process Monitoring of Intermediate Painting Stages ( DFT Checks) Final Visual & Painting DFT Checks Review of Painting Reports
1 1 1.5 1.5 3 2
15
PRESERVATION AND PACKING INSPECTION
4.5
15.1 15.2 15.3
Verifying the cleanliness of Vessel from inside Releasing for Preservation Carrying out Packing Inspection of Vessel
1 1 2.5
13 13.1 13.2 13.3 13.4 13.5
6
10
16
RELEASE
5
16.1 16.2
Verifying the Complete Documents including COC from Vendor ISSUE OF IRN & IRC TOTAL PERCENTAGE
2.5 2.5 100