Solapur
O&M - OPERATION DEPARTMENT
TURBINE PRESTART UP CHECKLIST Sr. No.
Activity
Remarks
Status
1
Check That All Major Permits are cancelled & normalized.
Make a List of Pending Permits.
2
Check that SACW System is in Service.
Standby SACW pump is available in auto
3
Turbine Side IA/SA is charged.
Monitor IA and SA press.
4
Condensate pit is empty and dewatering pumps are available
Monitor condensate pit level
5
Check all important Oil Levels.
MOT/MDBFP/TDBFP/Seal Oil/ Control oil /TDBFP CRH oil tank/HPBP oil tank/ LP bypass oil Tank/ CEP thrust brg. oil level
6
All Important water levels normal
Hotwell/Deaerator/TG ECW tank levels/Stator water
7
Check That CW System is in Service and Charged up to CT. Standby CW pump is available
Monitor CW Sump level. CW overhead tank level, CW flow, number of CT fans in service
8
ACW System in Service with two PHE’s
ACW system FG is ON and healthy. Standby ACW pump available in auto
9
ACW self-cleaning strainers in auto
FG ON, Monitor SCS DP
10
TG ECW System in Service with two PHE’s
TGECW system FG on and healthy. Standby TGCW pump available in auto
11
HOTWELL is filled up to Normal Level. Normal makeup and Emergency makeup control station is available and in auto
DM Makeup and CST Pump Availability.DM and CST level OK.
12
Condensate system is charged through LP Heaters
13
Feedwater system is charged through HP heaters
Prepared By Pradeep Kayarkar Sr. Manager
Reviewed By
Approved By PAGE-1
Solapur
O&M - OPERATION DEPARTMENT
TURBINE PRESTART UP CHECKLIST 14
At least one CEP in service. All CEP parameters are healthy.
15
CPU in service after consultation from Chemist as per requirement
16
Chemical dosing system Ammonia and Hydrazine in service
Dosing valves to CPU outlet and BFP’s suction are lined up
17
Atmospheric flash tank and drain network service water is charged for cooling
Service water pneumatic valve are in auto
18
Auxiliary PRDS is charged. Pressure and temperature is maintained in auto.
Ensure Deaerator pegging
19
MOT lube oil, control oil, seal oil, stator Monitor lube oil, hydraulic oil, water, hydrogen gas coolers are charged from stator water, H2 cold gas, seal ECW cooling water. oil temp etc...
20
All TG equipment’s like CEP. MDBFP, TDBFP coolers are charged from ECW water.
Monitor lube oil, bearing temp. Temperature control is in auto
21
MDBFP is in service. All MDBFP parameters are healthy.
MDBFP FG is ON. MDBFP Scoop and FRS in auto
22
All BFP’s mechanical seal ammonia dosing system is healthy
Observe Seal water temp. Regularly
23
All BFP’s Boiler RH spray manual valves are kept opened
24
Generator Stator water system in service with Observe stator water FG ON and healthy with mixed bed ion parameters like tank level, exchanger in service conductivity and temp.
25
Generator Seal oil system in service. All Seal oil system FG ON and standby seal oil pumps and DC seal oil pump healthy are healthy
27
Main Turbine is on barring. Standby AOP and EOP healthy in auto.
Turning Gear FG is ON and healthy.
28
Main Turbine Hydraulic oil (control oil) pumps are in service
Hydraulic oil FG is ON and healthy
29
Generator Casing is filled with hydrogen with pressure above 4.7 Ksc and Purity above 98%
Monitor H2 pressure and Purity, Cold/ Hot gas temp
Prepared By Pradeep Kayarkar Sr. Manager
CEP FG is ON and other CEP’s are available in auto
Reviewed By
Approved By PAGE-2
Solapur
O&M - OPERATION DEPARTMENT
TURBINE PRESTART UP CHECKLIST 30
Main Turbine gland steam is charged and Condenser Vacuum is pulled. Condense Vacuum pump’s FG is ON
31
LP turbine gland steam temperature control valve in auto
32
TD BFP-A/B is on barring
TDBFP TSI healthy
33
Turbine Drains Operation Checked & all are Operative.
TG drains including MAL drains FG ON and healthy
34
All turbine extractions Forced Close NRV are All FCNRV’s instrument air healthy valve is opened at local
35
Main turbine & TDBFP Exhaust Hood Spray is lined up.
36
HPBP & LPBP Spray is lined up.
37
All heater Emergency drip & Normal Drip is Lined up.
38
Drip Pumps Availability Checked.
39
Turbine & Generator side all measuring instruments are OK. Turbine TSI and Casing – Shaft temperatures measurements are healthy
40
TDBFP warm up done and ready for rolling
41
SWAS parameters are available and within limits
Observe all chemical parameters
42
All-important control loops are in auto
Gland steam, H2 temp control, Hotwell level Control, DEA level control, TG ECW overhead tank level etc...
43
Turbine P&I Checks Completed
Protocol prepared and signed
44
Turbine resetted and drain between CV and Stop Valve of HPT/ IPT opened. Turbine MS HP/IP stress is within limits and HRH warm up drains are opened to increase MS and HRH temp at turbine inlet
45
Take Clearance from departments
Prepared By Pradeep Kayarkar Sr. Manager
One GSC VEF is in Service and Gland steam pressure control in auto.
Exhaust hood spray temp control valve in auto
All heaters levels to be monitored
Make a List of Bad measuring Instruments
TMD / Electrical / C&I
Reviewed By
Approved By PAGE-3
Solapur
O&M - OPERATION DEPARTMENT
TURBINE PRESTART UP CHECKLIST 46
Chemistry Department is informed for Main Turbine Rolling.
For Steam Sample/H2 purity and Dew point.
47
Turbine trip channel’s (Trip solenoid) healthiness to be checked after turbine reset
Overspeed, Overpressure, Hardware protection healthiness checked
Prepared By Pradeep Kayarkar Sr. Manager
Reviewed By
Approved By PAGE-4