PETRONAS RAPID Project Johor, Malaysia 350 KTA LLDPE PLANT Project n° 61070F Process Design Package
Nov Vol.
VOLUME 1
CHAPTER 4
BLOCK FLOW DIAGRAM
This chapter includes the following document:
61070F-3200-BFD-0010-001
rev 2
Block Flow Diagram
© INEOS Commercial Services UK Limited. All rights reserved. This document is the property of INEOS Commercial Services UK Limited, and the information and images it contains are strictly confidential and may not be altered or amended, copied, used or disclosed without the express permission of INEOS Commercial Services UK Limited.
2012 : 1
Met CATALYST DELIVERY OSBL STORAGE
Zg CATALYST DELIVERY OSBL STORAGE
ISBL LLDPE PLANT CATALYST STORAGE
OSBL
LLDPE PDP SCOPE
(NOTE 1)
INNOVENE™ G CORE PLANT
CATALYST INJECTION UNIT
S1 LIQUID ADDITIVE DELIVERY OSBL REAGENT STORAGE UNIT
B1 LIQUID ADDITIVE DELIVERY OSBL
START-UP POWDER TEAL
DELIVERY
DELIVERY OSBL ADDITIVES STORAGE (NOTE 1)
ANALYSER SHELTER
ADDITIVES DELIVERY
HYDROGEN
HYDROGEN OSBL
FEEDSTOCK PREPARATION UNIT
ETHYLENE OSBL
ETHYLENE
(NOTE 2) COMONOMER
HEXENE-1
POLYMERISATION & VENT RECOVERY UNITS
ADDITIVES & PELLETISATION UNIT
PELLET BLENDING UNIT
PRODUCT LOGISTICS: FINAL CONVEYING PELLET DEDUSTING BAGGING PACKAGING WAREHOUSE OSBL
NOTE 3
UNLOADING &STORAGE OSBL BUTENE-1 UNLOADING &STORAGE OSBL OCTENE-1 UNLOADING &STORAGE OSBL PENTANE UNLOADING &STORAGE OSBL
PROCESS VENTS PENTANE
FLARE OSBL
MAINTENANCE ADMINISTRATION BUILDING OSBL
LIQUID RECOVERY UNIT
PE FLARE KO DRUM MAIN
HC LIQUID DRAIN OSBL (SCU)
POWDER / PELLET
LABORATORY BUILDING
WATER PIT
OSBL
HIGH PURITY HP NITROGEN DISTRIBUTION
CENTRAL CONTROL ROOM
HIGH PRESSURE NITROGEN DISTRIBUTION STORM WATER OSBL
LLDPE ISBL FIELD RACK ROOM
OSBL
LLDPE ISBL
HT VOLTAGE SUPPLY
ELECTRICAL SUBSTATION
OSBL
WASTE WATER TREATMENT OSBL MP AND LP NITROGEN DISTRIBUTION
STEAM CONDENSATE RECOVERY
HP STEAM DISTRIBUTION
LP STEAM DISTRIBUTION
FUEL GAS DISTRIBUTION
COOLING WATER DISTRIBUTION
DEMINERALISED WATER DISTRIBUTION
CONDENSATE RETURN OSBL
HP STEAM SUPPLY OSBL
LP STEAM SUPPLY OSBL
FUEL GAS SUPPLY
COOLING WATER OSBL
DEMINERALISED WATER SUPPLY OSBL
NITROGEN PURIFICATION
HP NITROGEN SUPPLY OSBL (HPN)
LP NITROGEN RAW MP & DISTRIBUTION
MP NITROGEN SUPPLY OSBL (LPN - NOTE 5)
NOTES : 1- COMMON STORAGE BUILDING FOR CATALYST AND ADDITIVES 2- DESIGN OF THE FEEDSTOCK PREPARATION UNIT ACCORDING
2 1 0 Rev
INSTRUMENT AIR DISTRIBUTION
PLANT AIR DISTRIBUTION
INSTRUMENT AIR SUPPLY OSBL
PLANT AIR SUPPLY
Dec 2012
PDP UPDATE
Nov 2012
UPDATED
July 2012
ISSUE FOR PDP
Date
Modifications
Dwg
Check
MGU CMM / MGU MGU Spec.Eng.
FBN FBN FBN Proj.Eng
TO ACTUAL FEED QUALITY 3- LLDPE ISBL ENDS AT THE BLENDER OUTLET NOZZLE. A DUTY SPECIFICATION FOR FINAL CONVEYING AND DEDUSTING UNIT IS PROVIDED. 4- UTILITIES NOT SHOWN ARE NOT DIRECTLY USED/GENERATED BY THE TECHNOLOGY: SERVICE AND DRINKING WATER, PETRONAS PROJECT RAPID
FIRE WATER, OILY WATER, RAIN WATER
BLOCK FLOW DIAGRAM
JOHOR - MALAYSIA
5- OSBL LPN is used ISBL and called MPN.
350 KTA LLDPE PLANT © INEOS Commercial Services UK Limited. All rights reserved. This document is the property of INEOS Commercial Services UK Limited, and the information and images it contains are strictly confidential and may not be altered or amended, copied, used or disclosed without the express permission of INEOS Commercial Services UK Limited.
Scale: None
RAPID-L20-INE-PRO-PFD-3200-0001 61070F 3200 BFD 0010 001 Activity
Unit
Codes
Dwg N°
2 Rev.