LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION SINGLE 'V'

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=

LS

PARAMETERS SETTING PROCESS KG/SHIFT 1). SMAW 2). SAW

q=

60

8 R.F.=

R.G.=

(C/S) (L/S) 3).FCAW (1.2 ) 4). GTAW

THK= 10

2

HRS/KG

1.6 25 15 4.5 0.8

5.00 0.32 0.53 1.78 10.00

LG OF LONG SEAM= 600 MATERIAL (SS/STEEL)= STEEL

2

DENSITY= 0.00000785

POSITION OF WELDING 1). 1G 2). 2G 3). 3G 4). 4G

MULTIPLICATION FACTOR 1 1.6 1.3 1.8

LESSACCESSIBLE YES NO

MULTIPLICATION FACTOR 2 1

ALL DIMENSIONS ARE IN MM

ROOT RUN= O/S WELDING= C/B WELDING= TOTAL WELDING=

CROSS SEC. AREA TOTAL WELD KG 36.8 0.2 52.0 0.2 104.5 0.5 156.6 0.7

LONG SEAM

PROCESS

POSITION

CODE

CODE

CHIP BACK DEPTH(MM) THK <= 30 THK > 30

6 12

CALCULATED RUN TIME TO BE CONSIDERED (min) (Hrs) (Hrs) 2 104.0 1.7 2.0 2 15.7 0.3 2.0 2 472.7 7.9 7.9 TOTAL = 592.4 9.9 11.9

ACCESSIBLE LESS (Y/N)

OUTSIDE ROOT RUN

100%

1

5

1

1.0

Y

OUT SIDE BALANCE

100%

2

0.53

1

1.0

Y

CHIP BACK WELDING

100%

1

5

2

1.6

Y

151198161.xls.ms_office, LSSINGLEV, 6/11/2013

PAGE 1 OF 14

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION SINGLE 'V'

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=

1). SMAW 2). SAW

q= 45

6 R.F.=

R.G.=

ls

PARAMETERS SETTING PROCESS KG/SHIFT (C/S) (L/S) 3).FCAW (1.2 ) 4). GTAW

THK= 6

0

HRS/KG

1.6 25 15 4.5 0.8

5.00 0.32 0.53 1.78 10.00

LG OF LONG SEAM= 3200 MATERIAL (SS/STEEL)= STEEL

1

DENSITY= 0.00000785

POSITION OF WELDING 1). 1G 2). 2G 3). 3G 4). 4G

MULTIPLICATION FACTOR 1 1.6 1.3 1.8

LESSACCESSIBLE YES NO

MULTIPLICATION FACTOR 2 1

ALL DIMENSIONS ARE IN MM

ROOT RUN= O/S WELDING= C/B WELDING= TOTAL WELDING=

CROSS SEC. AREA TOTAL WELD KG 21.3 0.5 28.2 0.7 104.5 2.6 132.8 3.3

LONG SEAM

PROCESS

POSITION

CODE

CODE

CHIP BACK DEPTH(MM) THK <= 30 THK > 30

6 12

CALCULATED RUN TIME TO BE CONSIDERED (min) (Hrs) (Hrs) 2 320.4 5.3 5.3 2 45.4 0.8 2.0 2 2521.2 42.0 42.0 TOTAL = 2887.0 48.1 49.4

ACCESSIBLE LESS (Y/N)

OUTSIDE ROOT RUN

100%

1

5

1

1.0

Y

OUT SIDE BALANCE

100%

2

0.53

1

1.0

Y

CHIP BACK WELDING

100%

1

5

2

1.6

Y

151198161.xls.ms_office, LSSINGLEV (2), 6/11/2013

PAGE 2 OF 14

LONG SEAM/ CIRC SEAM WELD KG & RUN TIME ESTIMATION DOUBLE 'V'

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)= q=

LS

45

1). SMAW 2). SAW

(C/S) (L/S) 3).FCAW (1.2 ) 4). GTAW

60.0 THK= 90 R.F.=

2

R.G.=

60

DENSITY= 0.00000785

3

ALL DIMENSIONS ARE IN MM

ROOT RUN= O/S WELDING= C/B WELDING= TOTAL WELDING=

CROSS SEC. AREA TOTAL WELD KG 38.9 0.3 1732.3 13.5 746.8 5.8 2479.2 19.4

LONG SEAM

1.6 25 15 4.5 0.8

5.00 0.32 0.53 1.78 10.00

LG OF LONG SEAM= 995 MATERIAL (SS/STEEL)= STEEL

28.0 =

PARAMETERS SETTING PROCESS KG/SHIFT HRS/KG

PROCESS

POSITION

CODE

CODE

OUTSIDE ROOT RUN

100%

1

5

2

1.6

OUT SIDE BALANCE

100%

1

5

1

1.0

CHIP BACK WELDING

100%

1

5

1

1.0

POSITION OF WELDING 1). 1G 2). 2G 3). 3G 3). 4G

MULTIPLICATION FACTOR 1 1.6 1.3 1.3

LESSACCESSIBLE YES NO

MULTIPLICATION FACTOR 2 1

CHIP BACK DEPTH(MM) THK <= 30 6 THK > 30 12 RUN TIME TO BE CONSIDERED

CALCULATED (min) (Hrs) Y 2 291.8 4.9 Y 2 8118.4 135.3 Y 2 3500.0 58.3 TOTAL = 11910.2 198.5

ACCESSIBLE LESS (Y/N)

151198161.xls.ms_office, LSDOUBLEV, 6/11/2013

(Hrs) 4.9 135.3 58.3 198.5

PAGE 3 OF 14

LONG SEAM/CIRC SEAM WELD KG & RUN TIME ESTIMATION COMPOUND 'V' =

RUN TIME TIME REQUIRED FOR L/SEAM OR C/SEAM (LS/CS)=

CS

10

1). SMAW 2). SAW

(C/S) (L/S) 3).FCAW (1.2 ) 4). GTAW

56 q=

THK= 70

45

R.F.=

2

DENSITY= 0.00000785

3

ALL DIMENSIONS ARE IN MM

ROOT RUN= O/S WELDING= C/B WELDING= TOTAL WELDING=

CROSS SEC. AREA TOTAL WELD KG 38.9 2.5 1110.9 73.1 259.2 17.1 1370.1 90.2

CIRC SEAM

HRS/KG

1.6 25 15 4.5 0.8

5.00 0.32 0.53 1.78 10.00

I/D OF SHELL 2600 MATERIAL (SS/STEEL)= STEEL

12

R.G.=

PARAMETERS SETTING PROCESS KG/SHIFT

PROCESS

POSITION

CODE

CODE

POSITION OF WELDING 1). 1G 2). 2G 3). 3G 4). 4G

MULTIPLICATION FACTOR 1 1.6 1.3 1.8

LESSACCESSIBLE YES NO

MULTIPLICATION FACTOR 2 1

CHIP BACK DEPTH(MM) THK <= 30 THK > 30

6 12

CALCULATED RUN TIME TO BE CONSIDERED (min) (Hrs) (Hrs) 2 1497.0 25.0 25.0 2 2808.9 46.8 46.8 2 655.4 10.9 10.9 TOTAL = 4961.3 82.7 82.7

ACCESSIBLE LESS (Y/N)

OUTSIDE ROOT RUN

100%

1

5

1

1.0

Y

OUT SIDE BALANCE

100%

2

0.32

1

1.0

Y

CHIP BACK WELDING

100%

2

0.32

1

1.0

Y

151198161.xls.ms_office, LSCOMPOUND, 6/11/2013

PAGE 4 OF 14

NOZZLE WELD KG & RUN TIME ESTIMATION SINGLE 'V'

NOZZLE ON SHELL/DEND) (D/S) ? S

CFW= 10 INC. ANG=45

MATERIAL (SS/STEEL)= STEEL DENSITY= 7.85E-06 NOZZLE O/D= 60

4300

SHELL I/D=

R.F.= 2

NOZ O/D 60

ELLIPSE DIMENSION MAJOR AXIS= MINOR AXIS= LG. OF WELDING=

64.0 64 201.07

ON SHELL OUTSIDE ROOT RUN OUT SIDE BALANCE CHIP BACK WELDING

100% 100% 100%

WEIGHT CROSS SEC. CALCULATION AREA ROOT RUN= 39.5 O/S WELDING= 298.54 C/B WELDING= 56.55 TOTAL WELDING= PROCESS POSITION CODE CODE 1 5 1 1.0 1 5 1 1.0 1 5 1 1.0

HRS/KG 5.00 0.53 1.78 10.00

OFF SET= 0

THK= 26

R.G= 4

PARAMETERS SETTING PROCESS KG/SHIFT 1). SMAW 1.6 2). SAW 15 3). FCAW (1.2 ) 4.5 4). GTAW 0.8

WELD KG ON SHELL ON D/END 0.06 0.06 0.47 0.47 0.09 0.09 0.56 0.56

POSITION OF WELDING 1). 1G 2). 2G 3). 3G

MULTIPLICATION FACTOR

LESS ACCESSIBLE YES NO

MULTIPLICATION FACTOR

1 1.6 1.3

2

1

CHIP BACK DEPTH(MM) THK <= 30 6 THK > 30 12

CALCULATED RUN TIME TO BE CONSIDERED (min) (Hrs) (Hrs) 2 282.7 4.7 4.7 2 282.7 4.7 4.7 2 53.6 0.9 2.0 TOTAL = 619.0 10.3 11.4

ACCESSIBLE LESS (Y/N)

Y Y Y

151198161.xls.ms_office, NOZSINGLEV, 6/11/2013

PAGE 5 OF 14

NOZZLE WELD KG & RUN TIME ESTIMATION

DOUBLE 'V'

NOZZLE ON SHELL/DEND) (D/S) ? D 50 MATERIAL (SS/STEEL)= STEEL

INC. ANG= 60

50

DENSITY= 7.85E-06

NOZZLE O/D=

OFF SET=

653

500

60 THK= 90

R.F.= 2

10 10

2450

SHELL I/D=

28

653 3

INC. ANG= 45

736.6 656 4382.427

ON D/END

HRS/KG

1). SMAW 2). SAW 3).FCAW (1.2 ) 4). GTAW

1.6 15 4.5 0.8

5.00 0.53 1.78 10.00

POSITION OF WELDING 1). 1G 2). 2G 3). 3G

MULTIPLICATION FACTOR 1 1.6 1.3

LESS ACCESSIBLE YES NO

MULTIPLICATION FACTOR 2 1

NOZ O/D

R.G=

ELLIPSE DIMENSION MAJOR AXIS= MINOR AXIS= LG. OF WELDING=

PARAMETERS SETTING PROCESS KG/SHIFT

WEIGHT CALCULATION

ROOT RUN= O/S WELDING= C/B WELDING= TOTAL WELDING= PROCESS CODE

WELD KG CROSS SEC. AREA ON SHELL ON D/END 34.4 1.18 0.56 4519.30 155.47 73.11 752.19 25.88 12.17 181.35 85.28 POSITION ACCESSIBLE LESS CODE

CHIP BACK DEPTH(MM) THK <= 30 THK > 30

6 12

CALCULATED RUN TIME TO BE CONSIDERED (min) (Hrs) (Hrs) 2 4679.2 78.0 78.0 2 70188.5 1169.8 1169.8 2 11682.2 194.7 194.7 TOTAL = 86549.9 1442.5 1442.5

(Y/N)

OUTSIDE ROOT RUN

100%

2

0.53

1

1.0

Y

OUT SIDE BALANCE

100%

1

5

2

1.6

Y

CHIP BACK WELDING

100%

1

5

2

1.6

Y

151198161.xls.ms_office, NOZDOUBLEV (2), 6/11/2013

PAGE 6 OF 14

NOZZLE WELD KG & RUN TIME ESTIMATION SET ON

NOZZLE IN SHELL/DEND) (D/S) ? S

60

19.5

NOZ I/D

PARAMETERS SETTING PROCESS KG/SHIFT

MATERIAL (SS/STEEL)= STEEL

19.5

1). SMAW 2). SAW 3).FCAW (1.2 ) 4). GTAW

DENSITY= 0.00000785 `

INC. ANG.=

10

POSITION OF WELDING 1). 1G 2). 2G 3). 3G

CFW= 9 INC. ANG.= 60

3 NOZ I/D 21 NOZ O/D 60

1776

SHELL I/D=

THK= 60

CROSS SEC. AREA

ELLIPSE DIMENSION WEIGHT CALCULATION MAJOR AXIS= MINOR AXIS= LG. OF WELDING=

40.5 40.5 127.2

ROOT RUN=

38.15 357.25

O/S WELDING= TOTAL WELDING=

ON SHELL

HRS/KG 5.00 0.53 1.78 10.00

OFFSET= 0

R.F.= 1

R.G.=

1.6 15 4.5 0.8

PROCESS

POSITION

CODE

CODE

LESS ACCESSIBLE WELD KG ON SHELL ON D/END

0.04

0.04

0.36 0.36

0.36 0.36

ACCESSIBLE LESS (Y/N)

OUTSIDE ROOT RUN 100%

1

5

2

1.6

Y

OUT SIDE BALANCE 100%

1

5

1

1.0

y

2 2

TOTAL =

151198161.xls.ms_office, NOZSETON, 6/11/2013

YES NO

CALCULATED RUN TIME (min) (Hrs) 342.6 5.7 214.1 3.6 556.7 9.3

MULTIPLICATION FACTOR 1 1.6 1.3

MULTIPLICATION FACTOR 2 1

TO BE CONSIDERED (Hrs) 5.7 3.6 9.3

PAGE 7 OF 14

FILLET WELD KG & RUN TIME ESTIMATION SINGLE SIDE FILLET JOINT PARAMETERS SETTING PROCESS KG/SHIFT 1). SMAW LENGTH OF WELDING(MM)= 10000.000 2). SAW 3).FCAW (1.2 ) MATERIAL (SS/STEEL)= STEEL 6

6

WELD CALCULATION TOTAL WELDING

CROSS SEC. AREA 18.00

FILLET WELD

MULTIPLICATION FACTOR 1 1.1

LESSACCESSIBLE YES

MULTIPLICATION FACTOR 2

NO

1

POSITION

CODE 1

CODE 5.00

5.00 0.53 1.78

DENSITY= 0.00000785 FOR CALCULATING WELD LENGTH POSITION OF RADIUS OF WELDING(MM)= 1000 INCLUDED ANGLE OF WELDING(DEG)= 60 WELDING LENGTH OF WELDING(MM)= 1047.198 1). 1F/2F 2) 3F

TOTAL WELD KG 1.41

PROCESS

HRS/KG

1.6 15 4.5

1

1.0

ACCESSIBLE LESS (Y/N) Y

2

TOTAL =

CALCULATED RUN TIME (min) (Hrs) 847.8 14.1 847.8 14.1

151198161.xls.ms_office, FILLETSINGLE, 6/11/2013

TO BE CONSIDERED (Hrs) 14.1 14.1

PAGE 8 OF 14

FILLET WELD KG & RUN TIME ESTIMATION DOUBLE SIDE FILLET JOINT PARAMETERS SETTING PROCESS KG/SHIFT

WELDING BY SINGLE OPERATOR/ DOUBLE OPERATOR(S/D)? S LENGTH OF WELDING(MM)=

785.000

1). SMAW 2). SAW 3).FCAW (1.2 )

HRS/KG

1.6 15 4.5

5.00 0.53 1.78

MATERIAL (SS/STEEL)= STEEL 6

DENSITY= 0.00000785 FOR CALCULATING WELD LENGTH RADIUS OF WELDING(MM)= 1000 INCLUDED ANGLE OF WELDING(DEG)= 60 LENGTH OF WELDING(MM)= 1047.198

10

6

WELD CALCULATION FIRST SIDE WELDING SECOND SIDE WELDING

6

POSITION OF WELDING 1). 1F/2F 2) 3F

MULTIPLICATION FACTOR 1 1.1

CROSS SEC. AREA 18.00 30.00

TOTAL WELD KG 0.11 0.18

LESSACCESSIBLE YES

MULTIPLICATION FACTOR 2

48.00

0.30

NO

1

TOTAL WELDING=

SINGLE OPERATOR

PROCESS

POSITION

CODE

CODE

ACCESSIBLE LESS (Y/N)

FIRST SIDE

100%

1

5.00

1

1.0

Y

SECOND SIDE SIDE

100%

1

5.00

1

1.0

Y

2 2 TOTAL=

151198161.xls.ms_office, FILLETDOUBLE, 6/11/2013

CALCULATED RUN TIME (min) (Hrs) 66.6 1.1 110.9 1.8 177.5 3.0

TO BE CONSIDERED (Hrs) 2.0 2.0 4.0

PAGE 9 OF 14

FILLET WELD KG & RUN TIME ESTIMATION DOUBLE SIDE + FULL PENETATION JOINT

FIRST SIDE

20

SECOND SIDE

PROCESS? (DOT / WITH CHIP BACK / TIG+SMAW) (D/C/T) ? D LENGTH OF WELDING(MM)= 1047.198 MATERIAL (SS/STEEL)= STEEL

PARAMETERS SETTING PROCESS KG/SHIFT 1). SMAW 1.6 2). SAW (TWIN HEAD) 14 28 3).FCAW (1.2 ) 4.5 4). GTAW+SMAW 0.8

9.5 70 DEG

20 RG=

70 deg

DENSITY= 7.85E-06 FOR CALCULATING WELD LENGTH RADIUS OF WELDING(MM)= 1000 INCLUDED ANGLE OF WELDING(DEG)= 60 LENGTH OF WELDING(MM)= 1047.198

20

2 CHIP BACK DEPTH(MM)= 20

1

MULTIPLICATION FACTOR 1 1.1

6

20 1+D,2

1+C,3+C

76 WELD CALCULATION CROSS SEC. AREA ROOT RUN (BOTH SIDE) 76 FIRST SIDE WELDING 305.16 SECOND SIDE WELDING TOTAL WELDING=

POSITION OF WELDING 1). 1F/2F 2) 3F

TOTAL WELD KG 0.62 2.51

305.16 610.32

4 26

(INCLUDING CHIP BACK)

2.51 5.02 PROCESS

DOT

39

POSITION

CODE

CODE

ACCESSIBLE LESS (Y/N)

ROOT RUN (BOTH SIDE)

100%

2

0.57

1

1.0

Y

2

FIRST SIDE

100%

2

0.57

1

1.0

Y

2

SECOND SIDE SIDE

100%

2

0.57

1

1.0

Y

2 TOTAL=

151198161.xls.ms_office, FILLETDOUBLEVFP, 6/11/2013

LESS-ACCESSIBLE YES

MULTIPLICATION FACTOR 2

NO

1

CALCULATED RUN TIME (min) (Hrs) 42.6 0.7 172.0 2.9 172.0 2.9 193.3 6.4

TO BE CONSIDERED (Hrs) 2.0 2.9 2.9 5.7

PAGE 10 OF 14

FILLET WELD KG & RUN TIME ESTIMATION

G HRS/KG 5.00 0.570.29 1.78 10.00 FOR TIG

MULTIPLICATION FACTOR 1 1.1

MULTIPLICATION FACTOR 2 1

BE CONSIDERED (Hrs) 2.0 2.9 2.9 5.7

151198161.xls.ms_office, FILLETDOUBLEVFP, 6/11/2013

PAGE 11 OF 14

FILLET WELD KG & RUN TIME ESTIMATION SINGLE SIDE + FULL PENETATION JOINT PARAMETERS SETTING SECOND SIDE

PROCESS? (WITH OUT CHIPBACK / WITH CHIP PROCESS BACK / TIG+SMAW) (W/C/T) ? W 1). SMAW LENGTH OF WELDING(MM)= 52000.000 2). SAW 3).FCAW (1.2 ) MATERIAL (SS/STEEL)= STEEL 4). GTAW+SMAW

FIRST SIDE 20 60 DEG

10

DENSITY= 7.85E-06 FOR CALCULATING WELD LENGTH POSITION OF RADIUS OF WELDING(MM)= 1000 INCLUDED ANGLE OF WELDING(DEG)= 60 WELDING LENGTH OF WELDING(MM)= 1047.198 1). 1F/2F 2) 3F CHIP BACK DEPTH(MM)= 6

50 3 15

15

KG/SHIFT 1.6 20 4.5 0.8

HRS/KG 5.00 0.40 1.78 10.00 FOR TIG

MULTIPLICATION FACTOR 1 1.1

2

WELD CALCULATION FIRST SIDE WELDING SECOND SIDE WELDING TOTAL WELDING=

CROSS SEC. AREA 715.59 75.00

TOTAL WELD KG 292.10 30.62

790.59

322.72

WITH OUT C/B

(INCLUDING CHIP BACK)

PROCESS

POSITION

CODE

CODE

LESS-ACCESSIBLE YES

MULTIPLICATION FACTOR 2

NO

1

CALCULATED RUN TIME TO BE CONSIDERED (min) (Hrs) (Hrs) 1 87631.4 1460.5 1460.5 1 9184.5 1460.5 1460.5 TOTAL= 96815.9 2921.0 2921.0

ACCESSIBLE LESS (Y/N)

FIRST SIDE

100%

4

5.00

1

1.0

N

SECOND SIDE SIDE

100%

4

5.00

1

1.0

N

151198161.xls.ms_office, FILLETSINGLEVFP, 6/11/2013

PAGE 12 OF 14

FILLET WELD KG & RUN TIME ESTIMATION CORNER JOINT PARAMETERS SETTING SECOND SIDE

PROCESS? (WITH OUT CHIPBACK / WITH CHIP PROCESS BACK / TIG+SMAW) (W/C/T) ? W 1). SMAW LENGTH OF WELDING(MM)= 1047.198 2). SAW 3).FCAW (1.2 ) MATERIAL (SS/STEEL)= STEEL 4). GTAW+SMAW

FIRST SIDE 20 60 DEG

DENSITY= 7.85E-06 FOR CALCULATING WELD LENGTH POSITION OF RADIUS OF WELDING(MM)= 1000 INCLUDED ANGLE OF WELDING(DEG)= 60 WELDING LENGTH OF WELDING(MM)= 1047.198 1). 1F/2F 2) 3F CHIP BACK DEPTH(MM)= 6

10 3 15

15

KG/SHIFT 1.6 20 4.5 0.8

HRS/KG 5.00 0.40 1.78 10.00 FOR TIG

MULTIPLICATION FACTOR 1 1.1

2

WELD CALCULATION FIRST SIDE WELDING SECOND SIDE WELDING TOTAL WELDING=

CROSS SEC. AREA 464.12 75.00

TOTAL WELD KG 3.82 0.62

539.12

4.43

WITH OUT C/B

(INCLUDING CHIP BACK)

PROCESS

POSITION

CODE

CODE

LESS-ACCESSIBLE YES

MULTIPLICATION FACTOR 2

NO

1

CALCULATED RUN TIME TO BE CONSIDERED (min) (Hrs) (Hrs) 2 2289.2 38.2 38.2 2 369.9 38.2 38.2 TOTAL= 2659.1 76.3 76.3

ACCESSIBLE LESS (Y/N)

FIRST SIDE

100%

4

5.00

1

1.0

Y

SECOND SIDE SIDE

100%

4

5.00

1

1.0

Y

151198161.xls.ms_office, CORNER JOINT, 6/11/2013

PAGE 13 OF 14

FILLET WELD KG & RUN TIME ESTIMATION CORNER JOINT PARAMETERS SETTING SECOND SIDE

PROCESS? (WITH OUT CHIPBACK / WITH CHIP PROCESS BACK / TIG+SMAW) (W/C/T) ? W 1). SMAW LENGTH OF WELDING(MM)= 1047.198 2). SAW 3).FCAW (1.2 ) MATERIAL (SS/STEEL)= STEEL 4). GTAW+SMAW

FIRST SIDE 20 60 DEG

DENSITY= 7.85E-06 FOR CALCULATING WELD LENGTH POSITION OF RADIUS OF WELDING(MM)= 1000 INCLUDED ANGLE OF WELDING(DEG)= 60 WELDING LENGTH OF WELDING(MM)= 1047.198 1). 1F/2F 2) 3F CHIP BACK DEPTH(MM)= 6

10

3 15

KG/SHIFT 1.6 20 4.5 0.8

HRS/KG 5.00 0.40 1.78 10.00 FOR TIG

MULTIPLICATION FACTOR 1 1.1

2

WELD CALCULATION FIRST SIDE WELDING SECOND SIDE WELDING TOTAL WELDING=

CROSS SEC. AREA 490.59 39.00

TOTAL WELD KG 4.03 0.32

529.59

4.35

WITH OUT C/B

(INCLUDING CHIP BACK)

POSITION

ACCESSIBILITY

CODE

CODE

(Y/N)

FIRST SIDE

100%

4

5.00

1

1.0

Y

100%

4

5.00

1

1.0

Y

MULTIPLICATION FACTOR 2

NO

1

CALCULATED RUN TIME TO BE CONSIDERED (min) (Hrs) (Hrs) 2 2419.7 40.3 40.3 2 192.4 40.3 40.3 TOTAL= 2612.1 80.7 80.7

PROCESS

SECOND SIDE SIDE

LESS-ACCESSIBLE YES

151198161.xls.ms_office, CORNER JOINT (2), 6/11/2013

PAGE 14 OF 14

Related Documents

Welding Calculations
February 2021 0
Welding
February 2021 3
Welding
January 2021 5
Welding
March 2021 0
Weaving Calculations
February 2021 0
Welding Technology
March 2021 0

More Documents from "Arunachalam Mani"

Welding Calculations
February 2021 0