INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO 1.0

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 1 of 32 REV NO: R0

PROTOCOL APPROVAL SHEET

The signatures below indicate of this protocol and its data collection forms certify that it may be executed. This approval is the joint responsibility of the listed functional areas of . PROTOCOL DEVELOPMENT Name

Designation

Signature

Date

PROTOCOL REVIEW Name

Designation

Signature

Date

Signature

Date

PROTOCOL APPROVAL Name

Designation

TABLE OF CONTENTS

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO SR. NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 2 of 32 REV NO: R0

CONTENTS

PAGE NO

1.0

PROTOCOL APPROVAL SHEET

1

2.0

PURPOSE, SCOPE, INTENDED USE, LOCATION, & RESPONSIBILITY

3

3.0

INSTALLATION QUALIFICATION PROCEDURE

4

4.0

EQUIPMENT/MATERIAL SPECIFICATION AND INSTALLATION CHECKS

5

4.1

AIR HANDLING UNIT

5

4.2

AIR FILTERS

8

4.3

DEHUMIDIFIER SPECIFICATION AND INSTALLATION CHECKS

10

4.4

PRE COOLING COIL TECHNICAL SPECIFICATION AND INSTALLATION CHECKS

12

4.5

DUCTING & INSULATION SPECIFICATION AND INSTALLATION CHECKS

14

4.6

TERMINAL HEPA FILTER HOUSING

15

4.7

TERMINAL HEPA FILTERS

16

4.8

SUPPLY AIR PERFORATED SS GRILLS

17

4.9

RETURN RISER PERFORATED SS GRILLS

18

4.10

RETURN RISER FILTERS

18

4.11

VOLUME CONTROL DAMPERS SPECIFICATION AND INSTALLATION CHECKS

19

4.12

FIRE DAMPERS SPECIFICATION AND INSTALLATION CHECKS

19

4.13

MAGNEHELIC GAUGES SPECIFICATION AND INSTALLATION CHECKS

20

4.14

TEMPERATURE & DP INDICATORS

21

4.15

CHW PIPING MANIFOLD & INSULATION SPECIFICATION CHECKS

22

4.16

CHW MANIFOLD VALVES & GAUGES SPECIFICATION AND INSTALLATION CHECKS

23

4.17

DRAIN U TRAP

26

5.0

CALIBRATION OF INSTRUMENTS

27

6.0

ABBREVIATIONS

28

7.0

OBSERVED DEVIATIONS

29

8.0

RECOMENDATIONS

30

9.0

CONCLUSION

31

10.0

ATTACHMENTS- AS BUILT DRAWINGS, TEST CERTIFICATES & CALIBRATION CERTIFICATES

32

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 3 of 32 REV NO: R0

2.0

PURPOSE, SCOPE, INTENDED USE, LOCATION AND RESPONSIBILITY

2.1

PURPOSE:



To provide the documentary evidences that the HVAC system (AHU-09) of Manufacturing Area is Installed as per design specification

2.2

SCOPE

This qualification protocol is applicable to the following rooms of Manufacturing Area Room Name Room Area in Ft2 False Ceiling Height Ft Room Volume in Ft3 GRANULATION

273.44

8.69

2377

MATERIAL IN

50.32

7.87

396

MATERIAL OUT

56.51

7.87

445

AIR LOCK

43.86

7.87

345

2.3

INTENDED USE:

  

To supply the required air quantity and quality to various rooms of Manufacturing Area. To maintain the temperature and humidity of room as per design specification. To provide differential air pressure of the room.

2.4

LOCATION Manufacturing Area

2.5 .    

RESPONSIBILITY: To To To To

prepare qualification protocol. submit qualification protocol to for approval. record the observation along with during execution of the protocol. submit final qualification report to for approval. To install the HVAC system as per approved designed specification and at designated place

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 4 of 32 REV NO: R0

ENGINEERING 

To review the Qualification protocol and report.



To get the system installed as per the design specification.



To provide utilities and supportive services for qualification.

TECHNICAL SERVICES 

To review and approval of qualification protocol and report.

QUALITY ASSURANCE 

To review and approval of qualification protocol and report.

3.0

INSTALLATION QUALIFICATION PROCEDURE:



Ensure that the AHU is installed at the designated place.



Check the Material of construction (MOC) of all the Critical parts.



Check other details as per the specifications of this protocol and enter the observations.



Check the Installation qualification parameters against their specification during installation of the AHU as record the same.



Document initial and date after each observation in respective column.



In case of any deviation, document in ‘Remark’ column and immediately inform to department head for necessary action.



Document the deviation details in Observed deviation section.



The Quality head and User department head of will decide whether deviation is acceptable or not.



If deviation is acceptable and it does not have any potential to impact on operation, initiate for operation qualification.



If deviation is not acceptable inform to Engineering Dept. head for necessary action for attending problems to complete Installation Qualification.

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 5 of 32 REV NO: R0

4.0 EQUIPMENT/MATERIAL SPECIFICATIONS & INSTALLATION CHECKS: 4.1 AIR HANDLING UNIT Sr. No 1

Item Description

Specification

Method of Observation

AHU HOUSING / CONSTRUCTION

a

Capacity

5050 CFM@160 mm of wc Static Pressure.

As per G.A. Dwg.

b

Over all Dimension

5239 L X 1450 W X 1150H in mm.

As per G.A. Dwg.

c

Basic construction

Aluminium frame work with pre coated G I panel with sandwich 43 ± 0.5 mm PUF insulated, Pre Filter section, 8 rows Cooling Coil, Blower & Motor section and Fine filter section

Visually

d

AHU Framework

Aluminium Extruded Section

Visually

2

Fan

a

Type / Model

b

M.O.C

BDB355T DRAUGHT FAN

As per G.A. Dwg.

Blower is made of G.I sheet

Visually

c

Capacity

5050 CFM

As per G.A. Dwg.

d

Static Pressure

160 mm WC Static Pressure

As per G.A. Dwg.

e

RPM

2874 RPM

As per G.A. Dwg.

Remarks

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 6 of 32 REV NO: R0

4.1 AIR HANDLING UNIT Sr. No

(Cont..)

Item Description

Specification

3

Motor

a.

Rating/Pole

7.5 KW / 2 Pole

b.

Speed in RPM

2916 rpm

4

Cooling Coil

Method of Observation

As per G.A. Dwg. Visually

a.

Type

Chilled Water Cooling Coil

As per G.A. Dwg.

b.

Coil Size and Face Area

1.1m x 0.92m & 10.89 Sqft.

Visually

c.

No of Rows

8 Rows

Visually

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 7 of 32 REV NO: R0

4.1 AIR HANDLING UNIT

(Cont..)

Sr. No

Item Description

5

Volume Control Dampers

a.

Type

Opposed Blade Aerofoil Design

Visually

b.

MOC/Thickness

Galvanized Iron

Visually

c.

Quantity

3 Nos

Visually

d.

Supply Air Damper Size

1100 W x 300 L mm

Visually

e.

Return Air Damper Size

1200 W x 300 L mm

Visually

f.

Fresh Air Damper Size

300 W x 300 L mm

Visually

6

Air Handling Unit Accessories

a.

DP Nozzle

4 No’s

Visually

b.

Flexible Connection (Fan)

Canvas Connection / 1 No

Visually

c.

Door Limit Switch

1 No’s

Visually

d.

View Lamp & View Glass

1 No’s

Visually

e.

Rubber Pad For AHU

8 No’s

Visually

f.

Cushy Foot (Blower)

6 No’s

Visually

g.

Drain Tray

SS – 304 with bottom insulation

Visually

Specification

Method of Observation

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 8 of 32 REV NO: R0

4.2 AIR FILTERS Sr. No

Item Description

Specification

Method of Observation

1

Pre filters

a.

Filter Media

synthetic media

b.

Filter Grade

G4

c.

Filter Type

Bag Type

Visually

d.

Filter Size / Qty

595Lx595Wx400H mm / 2 No 595Lx287Wx400H mm /2 No

Visually

Visually As per Mfg Sticker

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 9 of 32 REV NO: R0

4.2 AIR FILTERS: Sr. No

S

(Cont..)

Item Description

Specification

Method of Observation

2

Fine Filters

a.

Filter Media

Non woven synthetic media

b.

Filter Grade

F8

c.

Filter Type

Bag Type

Visually

d.

Filter Size / Qty

595Lx595Wx400H mm / 2 No 595Lx287Wx400H mm /2 No

Visually

Visually As per Mfg Sticker

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 10 of 32 REV NO: R0

4.3 DEHUMIDIFIER SPECIFICATION & INSTALLATION CHECK: Sr. No

Item Description

Specification

Method of Observation

a

DH MODULE / CAPACITY

CCR – 100 / 600 CFM

As per GA DWG

b

APPROX. DIMENSIONS

1470x1020x1130 MM

As per GA DWG

c

FRAME

CRCA POWDER COATED

As per GA DWG

d

PROCESS AIR FLOW

600 CFM

As per GA DWG

e

PROCESS MOTOR MAKE

SIEMENS

As per GA DWG

f

PROCESS MOTOR RATING/CURRENT

0.5 HP / 1.12 Amps.

As per GA DWG

g

PROCESS MOTOR SPEED

1400 RPM

As per GA DWG

h

PROCESS FILTER

470x280x75 MM – 10 MICRONS

As per GA DWG

i

REACTIVATION AIR FLOW

200 CFM

As per GA DWG

j

REACT. MOTOR MAKE

SIEMENS

As per GA DWG

k

REACT. MOTOR RATING/CURRENT

180 WATTS / 0.8 Amps.

As per GA DWG

l

REACT. MOTOR RPM

2550 rpm

As per GA DWG

m

REACT. FILTER

260x250x75 MM – 10 MICRONS

As per GA DWG

n

DESICCANT ROTOR

470 DIA x 200 MM

As per GA DWG

Remarks: Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

4.3

AIR HANDLING UNIT AHU-09 //IQ/S09

DEHUMIDIFIER SPECIFICATION & INSTALLATION CHECK:

Sr. No

Item Description

Specification

PAGE NO. 11 of 32 REV NO: R0

Continued...

Method of Observation

o

HUMIDITY & TEMP. SENSOR

GALLTEC, GERMANY

As per GA DWG

p

PLC & HMI

MISTSUBISHI

As per GA DWG

q

LIMIT SWITCH

TECHNIC MAKE

As per GA DWG

r

PRESSURE SWITCH RANGE

(1 – 10 M BAR)

As per GA DWG

s

THERMOSTAT MAKE

ELCON 50 – 300 ◦ C

As per GA DWG

t

ELECTRICAL HEATERS

1.2KW x 12 Nos.

As per GA DWG

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 12 of 32 REV NO: R0

4.4 PRE - COOLING COIL TECHNICAL SPECIFICATIONS & INSTALLATION CHECK Sr. No

Item Description

Specification

Method of Observation

a

FRESH AIR CAPACITY

184 CFM

As per GA DWG

b

DIMENSIONS

600x600x550MM

As per GA DWG

c

MOC CASING

ALUMINUN PROFILES WITH 2MM THK

As per GA DWG

d

OUTER SKIN

0.63 MM PRE COATED & PRE PLASTIC

As per GA DWG

e

INNE SKN

0.63 MM PLAIN GI

As per GA DWG

f

INSULATION

PUFF WITH 23±2MM THK

As per GA DWG

g

PRE-COOLING COIL SIZE

10” x 10” x 8 ROW

As per GA DWG

h

COIL TUBE MOC/DIA

COOPER / 3/8” DIA

As per GA DWG

i

FIN MATERIAL

ALUMINUN 0.15MM THK

As per GA DWG

j

FILTER MAKE / TYPE / MEDIA/SIZE

AAF/ FLANGED / HDPE+NONOWEN+AL.MESH / 305x305x75

As per GA DWG

k

EU CLASSIFATION / EFFICIENCY

EU 4 / 90% DOWN TO 10 MICRON

As per GA DWG

l

PRESSURE DROP

4-5 MM OF WC

As per GA DWG

m

FINAL PRESSURE DROP

12MM OF WC

As per GA DWG

Remarks:

Installed By:

Checked By:

()

()

Date:

Date:

Approved By:() Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 13 of 32 REV NO: R0

4.4 PRE - COOLING COIL TECHNICAL SPECIFICATIONS & INSTALLATION CHECK Sr. No

Item Description

Specification

Method of Observation

n

DRAIN PAN MOC /THK/INSULATION

SS 304 / 1MM/12MM TORCELIN

As per GA DWG

o

DRAIN PIPE

SS 304 / DIA 25 MM

As per GA DWG

p

DAMPER MOC

GI POWDER COATING

As per GA DWG

q

DAMPER SIZE

9” x 9”

As per GA DWG

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 14 of 32 REV NO: R0

4.5 DUCTING AND INSULATION SPECIFICATION & INSTALLATION CHECK: Sr. No

Item Description

Specification

Method of Observation

DUCTING a

MOC

G.I. Sheet metal Ducting – Prefabricated ducts

As per T.C.

b

Duct size

As per duct layout

As per Dwg.

c

Duct to Duct Connection

Through TDF Flange & Nut Bolts

Visually

d

Flange Joints

Gasket & RTV sealant

Visually

Make

Kflex and Paramount

As per T.C.

b

MOC

Nitrile Rubber(Kflex)/Chemically Cross Linked Closed Cell Polyethylene(paramount)

As per T.C.

c

Thickness for supply duct

13 MM

As per T.C.

d

Thickness for return duct

9 MM

As per T.C.

e

Density

30 + 3 Kg/m3 (paramount)

As per T.C.

DUCT INSULATION a

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 15 of 32 REV NO: R0

4.6 SUPPLY AIR HEPA HOUSINGS: Sr. No

Item Description

Specification

Method of Observation

1

Make

SPECTRUM

As per T.C.

2

M.O.C

Extruded Aluminium

As per T.C.

3

Room No

Size / Qty

GRANULATION

610Lx610Wx175H mm / 06 No’s

Visually

MATERIAL IN

610Lx610Wx175H mm / 01 No’s

Visually

MATERIAL OUT

610Lx610Wx175H mm / 01 No’s

Visually

STAFF ENTRY

610Lx650Wx175H mm / 01 No’s

Visually

Remarks:

Installed By:

Checked By:

Approved By: ()

()

()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 16 of 32 REV NO: R0

4.7 TERMINAL HEPA FILTERS: Sr. No

Item Description

Specification

Method of Observation

1

MOC – Filter Frame / MOC – Filter Media

Aluminium Extruded / Micro Glass Fibre Pleated Media

As per T.C.

a

Type / Grade

Mini Pleat HEPA Filter / EU-13

As per T.C.

99.990 % down to 0.3µ

As per T.C.

b 2

Efficiency Room Name

Size / Qty

GRANULATION

580Lx580Wx124H mm / 06 No’s

Visually

MATERIAL IN

580Lx580Wx124H mm / 01 No’s

Visually

MATERIAL OUT

580Lx580Wx124H mm / 01 No’s

Visually

STAFF ENTRY

580Lx580Wx124H mm / 01 No’s

Visually

Remarks:

Installed By:

Checked By:

()

()

Approved By:()

Date:

Date:

Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 17 of 32 REV NO: R0

4.8 SUPPLY AIR PERFORATED SS GRILLS Sr. No

Item Description

Specification

1

MOC

Stainless steel Perforated

2

Room Name

Size / Qty

GRANULATION

680Lx 680W mm / 06 No’s

MATERIAL IN

680Lx 680W mm / 01 No’s

MATERIAL OUT

680Lx 680W mm / 01 No’s

STAFF ENTRY

680Lx 680W mm / 01 No’s

Method of Observation

Observation

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 18 of 32 REV NO: R0

4.9 RETURN AIR PERFORATED GRILLS: Sr. No 1

Item Description

Specification

MOC / Thickness

Stainless steel

2

Thickness

20G

3

Room Name

Size / Qty

Method of Observation Visually

Observation

Visually

GRANULATION

780Lx 380W mm / 06 No’s

Visually

MATERIAL IN

630Lx 380W mm / 01 No’s

Visually

MATERIAL OUT

630Lx 380W mm / 01 No’s

Visually

STAFF ENTRY

630Lx 380W mm / 01 No’s

Visually

Remarks: Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

4.10 RETURN AIR RISER FILTERS: Sr. No 1

Item Description MOC Media/ Frame

Specification Synthetic Fibre/Aluminium

2

Frame Thickness

20G

3

Room Name

Size / Qty

Method of Observation Visually

Observation

Visually

GRANULATION

780Lx 380W mm / 06 No’s

Visually

MATERIAL IN

630Lx 380W mm / 01 No’s

Visually

MATERIAL OUT

630Lx 380W mm / 01 No’s

Visually

STAFF ENTRY

630Lx 380W mm / 01 No’s

Visually

Remarks: Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 19 of 32 REV NO: R0

4.11 VOLUME CONTROL DAMPERS SPECIFICATION & INSTALLATION CHECK: Sr. No a

Item Description

Specification

Method of Observation

Body

16 G Aluminium sheet

visually

b

Louvers

16 G Aluminium sheet

visually

c

Bush

ALUMINUM

visually

d

Size / Qty

300 Hx300 L mm –12 No.

visually

e

Type

Opposed blade

Visually

Observation

Remarks: Installed By: () Date:

Checked By: () Date:

Approved By: () Date:

4.12 FIRE DAMPERS SPECIFICATION & INSTALLATION CHECK: Sr. No a

Item Description

Specification

Method of Observation

Body

18 G GI sheet

visually

b

Louvers

18 G GI sheet

visually

c

Fire Rating

2 Hours as per UL 555

visually

d

Size/Qty (for return)

550Lx550W mm– 1 No

visually

e

Type

Opposed blade

Visually

Remarks: Installed By: () Date:

Checked By: () Date:

Approved By: () Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 20 of 32 REV NO: R0

4.13 MAGNEHELIC GAUGE SPECIFICATION & INSTALLATION CHECK : Sr. No.

Item Description

Specification

a

Make

Dwyer

b

Range / Qty

0-50 MM WC / 2 Nos.

c

Body MOC

Die cast aluminium case and bezel with acrylic cover

d

Accuracy

(+/-)2% of F.S

e

Dial size /Process Connection

4" / 1/8" NPT Female

Method of Observation As per T.C. Visually As per product Specification As per T.C. Visually

Remarks:

Installed By: () Date:

Checked By: () Date:

Approved By: () Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 21 of 32 REV NO: R0

4.14 TEMPERATURE & DIFFERENTIAL PRESSURE INDICATORS Sr. No

Item Description

Specification

1

Differential Pressure, Temperature & RH Indicator

a

Make

ACE

b

MOC-Case

SS 304

c

Measuring Range for DP

0 to 10mm WC

Method of Observation

Visually As per T.C. As Per T.C

0

d

Measuring Range for Temperature / RH

0.0-50 C/

e

Accuracy Level

+ 0.5% of Full Scale

f

Size

75(W) x 70(H) x 40(T) mm

Visually

g

Quantity

3 Nos

Visually

2

Differential Pressure Indicators

a

Make

ACE

b

MOC-Case

SS 304

As per T.C.

c

Measuring Range for DP

0 to 10mm WC

As Per T.C

d

Accuracy Level

+ 0.5% of Full Scale

As Per T.C

e

Size

75(W) x 70(H) x 40(T) mm

Visually

f

Quantity

1 Nos

Visually

0.0 to 100.0 %RH

As Per T.C As Per T.C

Visually

Remarks:

Installed By: () Date:

Checked By: () Date:

4.15 CHW PIPING MANIFOLD & INSULATION SPECIFICATION CHECK:

Approved By: () Date:

Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 22 of 32 REV NO: R0

Sr. No

Item Description

1

Chilled Water Piping

a

Make

Jindal

b

MOC

M.S “C’ Class as per IS-1239 (PT-I) 2004

As per T. C.

c

Pipe Size

Ø 40 MM

As per Dwg.

2

CHW Piping Insulation

Specification

a

Make

k-Flex

b

M.O.C

Nitrile Rubber

c

Thickness

25mm

Method of Observation

Observation

Visually

Visually As per Spec. Visually

Remarks:

Installed By:

Checked By:

Approved By:

()

()

()

Date:

Date:

Date:

4.16 CHW PIPING VALVES SPECIFICATION AND INSTALLATION CHECK:

(Cont..)

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO Sr. No 1

Item Description

AIR HANDLING UNIT AHU-09 //IQ/S09 Specification

PAGE NO. 23 of 32 REV NO: R0 Method of Observation

Observation

Butterfly Valves As per T.C.

a

MOC

CI construction

b

Size in mm

Ø40 MM

Visually

c

Quantity

6 Nos.

Visually

2

Balancing Valves

a

MOC

Cast Gun metal (IS 318 Gr. LTB2)

b

Size

Ø40 MM

c

Quantity

1 No.

Visually

d

Hand Wheel

Nylon Gr. 66

Visually

e

End Connection Type BSP Female Threads

3

Drain Valves

a

M.O.C

Brass

Visually

b

Size & Quantity

Ø25 MM & 1 Nos

Visually

c

End Connection Type BSP Female Threads

Visually

d

Quantity

Visually

As per Dwg.

1 No

Visually

Remarks: Installed By: ()

Checked By: ()

Approved By: ()

Date:

Date:

Date:

4.16 CHW PIPING VALVES SPECIFICATION AND INSTALLATION CHECK: Sr.

Item Description

Specification

Method of

(Cont..) Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

No

PAGE NO. 24 of 32 REV NO: R0 Observation

4

Y Strainers

a

MOC

Cast Iron

b

Filter Screen

Stainless Steel Perforated Screen of 2-3mm Perforation X 24G

Visually

c

Size / Qty

Ø 40 MM / 1 No.

Visually

5

3 Way Mixing Valve With Actuator

a

MOC / Make

Brass / Siemens

Visually

b

Actuator Operating voltage at power supply of AC 24V

AC 24V + 20%

Visually

c

Size

Ø 32 MM

Visually

d

Quantity

1 No.

Visually

As per T.C.

Remarks:

Installed By: () Date:

Checked By: () Date:

Approved By: () Date:

4.16 CHW PIPING VALVES SPECIFICATION AND INSTALLATION CHECK: Sr.

Item Description

Specification

Method of Observation

(Cont..) Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 25 of 32 REV NO: R0

No 6

Temperature Gauges

a

Make

Baumer

As per T.C.

b

MOC-Case

SS

As per T.C.

c

Range

0-50 Deg.C

As per T.C.

d

Size

4’’(100 mm) dial type

As per T.C.

e

Connection size

½” BSP (M)

As per T.C.

f

Quantity

2 Nos

7

Pressure Gauges

Visually

a

Make

Baumer

As per T.C.

b

MOC-Case

SS

As per T.C.

c

Range

0 to 10 Kg/Cm2

As per T.C.

d

Size

4’’(100 mm) dial type

As per T.C.

e

Connection size

3/8 ” BSP

As per T.C.

f

Quantity

2 Nos.

Visually

Remarks:

Installed By: () Date:

Checked By: () Date:

Approved By: () Date:

4.16 CHW PIPING VALVES SPECIFICATION AND INSTALLATION CHECK: Sr. No

Item Description

Specification

Method of Observation

(Cont..) Observation

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 26 of 32 REV NO: R0

8

Auto Air Vent Valves

a

Body MOC

OTTONE/BRASS CW 617 N

b

Size

Ø25 MM

Visually

c

Quantity

1 No.

Visually

As per Manufacturers Specifications

Remarks: Installed By: () Date:

Checked By: () Date:

Approved By: () Date:

4.17 DRAIN U TRAP Sr. No

Item Description

Specification

Method of Observation

a

Pipe size

Ø40 MM

Visually

b

Pipe MOC

MS A Class Piping

Visually

c

Quantity

1 Nos.

Visually

Observation

Remarks:

Installed By: () Date:

Checked By: () Date:

Approved By: () Date:

5.0 CALIBRATION OF INSTRUMENTS:  

The following Instruments are attached with this system Ensure that all the Instruments are calibrated prior to operation qualification of system.

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

Instrument Name

Tag No.

AIR HANDLING UNIT AHU-09 //IQ/S09

Calibration Frequency

PAGE NO. 27 of 32 REV NO: R0

Calibration Done on

Inspected By: -

Calibration Due on

Approved By: -

6.0 ABBREVIATIONS Abbreviation

Description

Abbreviation

Description

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 28 of 32 REV NO: R0

AHU

Air Handling Unit

MM WG

Millimeter Water gauge

CHW

Chilled Water

NA

Not Applicable

HW

Hot Water

NLT

Not Less Than

CMH

Cubic Meter per Hour

IQ

Installation Qualification

DP

Differential Pressure

Pa

Pascal

cGMP

Current Good manufacturing practices

PID

Plant and Instrumentation Drawing

DWG.

Drawing.

QA

Quality Assurance

TR

Tonnage Refrigeration

GPM

Gallon per Minute

URS

User Requirement Specification

HVAC

Heating Ventilation and Air Conditioning

UOM

Unit of Measurement

GI

Galvanized Iron

SA

Supply air

VCD

Volume Control Damper

RA

Return air

CS

Carbon Steel

T.C.

Test Certificate

HEPA

High Efficiency Particulate Air

FPD

Final Pressure Drop

IPD

Initial Pressure Drop

MS

Mild Steel

MOC

Material Of Construction

ISO

International Standards Organization

7.0 OBSERVED DEVIATIONS: DEVIATIONS

Vindair Engineers Pvt Ltd

RH

Relative Humidity

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO Details of Deviations

PAGE NO. 29 of 32 REV NO: R0

:

Investigation

:

Corrective Action

:

Acceptable

AIR HANDLING UNIT AHU-09 //IQ/S09

: Yes / No

Deviation Approved By / Date :

Name :

8.0 RECOMMENDATIONS:

Sign :

Name :

Sign :

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

9.0

CONCLUSION:

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 30 of 32 REV NO: R0

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO

:

AIR HANDLING UNIT AHU-09 //IQ/S09

(Engineering)

Date: ( Q.A) Date

: 10.0 ATTACHMENTS

REV NO: R0

: Date

:

PAGE NO. 31 of 32

:

INSTALLATION QUALIFICATION SYSTEM NAME SYSTEM NUMBER DOCUMENT NO AS BUILT Drawings Materials Test Certificates Instruments Calibration Certificates

AIR HANDLING UNIT AHU-09 //IQ/S09

PAGE NO. 32 of 32 REV NO: R0

Related Documents


More Documents from "Doan Chi Thien"