IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE
Prepared by Carlo Leoni [Stationary Section Adviser]-30August 2006
IBN-ZAHR Inlet
MECHANICAL MAINTENANCE PROCEDURE “AIR COOLER” Heat Exchanger General Assembly view Floating Header
Tubes Stationary Header
Plug
Outlet
Fan
Conveyor
Scaffold
Electric motor
Structure
2
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE
“AIR COOLER” Heat Exchanger Vapor Inlet
Tube Bundle Details Stationary Header
Floating Header
Fin Tubes
Plug
Condensate Outlet
3
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE “AIR COOLER” Heat Exchanger Tube Assembly and Plug Detail Inlet Stationary Header
Fin Tubes Gasket
Plug
Grooves for expansion
4
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE “AIR COOLER” Heat Exchanger Maintenance Activity Cases Summary
1. Leakage from Header Plugs 1.1. On Line leak elimination [Temporary solution]
2. Leakage from Tubes 2.1. Leak elimination from expanded area 2.2. Leak elimination from broken tube 2.3. On line Leak elimination from broken tube [Temporary solution, Bottom & Top row only]
5
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE
Do Not Start The Job Without a Safety Plan 6
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE
“AIR COOLER” Heat Exchanger 1. Leakage from Header Plugs 1.1. On Line leak elimination [Temporary solution]
Drill blind hole and thread the leaking Plug on situ Screw in the threaded stud
This is a Maintenance Innovation made by IZ Special device Leak
Inlet Header
Assembly the special cap device with gasket and screw it in until the leak stops Replace gasket & Plug later in Shutdown Fin Tubes
Leaking Plug Additional Gasket
7
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE
“AIR COOLER” Heat Exchanger 2. Leakage from Tubes: 2.1. Leak elimination from Tube Expanded Area Shutdown, isolate & drain the equipment Blind Stationary Header Inlet & Outlet
PG
Stationary Header
Install Pressure Gauge Connect water pump
Fill system by water Raise the pressure
Leak
Locate leaks from outside Discharge water Open Plugs at leak position Remove gasket
See continuation Fin Tube Plug
8 Water Pump
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE
“AIR COOLER” Heat Exchanger 2. Leakage from Tubes: 2.1. Leak elimination from Tube Expanded Area PG
Stationary Header
Insert Expander tool, expand the tube up to the established torque Remove expander tool
Reinstall new gasket and plug Fill the system by water Raise the pressure Re-check leaks from outside [No more leak]
Leak
Discharge water Remove PG & water pump Remove In-Out Blinds and tight flange bolts
Fin Tube Plug
9 Water Pump
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE
“AIR COOLER” Heat Exchanger 2. Leakage from Tubes: 2.2. Leak elimination from broken Tube Shutdown, isolate & drain the equipment Blind Stationary Header Inlet & Outlet
PG
Stationary Header Install Pressure Gauge Connect water pump Fill system by water Raise the pressure Leak
Locate leaks from outside Drain water Open Plugs at leak position both sides And remove gasket Plug the leaking tube [both sides] Reinstall gasket & plugs [Both sides]
Fill in water again Raise pressure & check sealing Fin Tube
Drain water, remove PG & pump
Plug
Remove in-out blinds, tight bolts
10 Water Pump
Remove field blinds
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE “AIR COOLER” Heat Exchanger
2.3. On line Leak elimination from broken tube : [Temporary solution] [Bottom & Top row only] B C
C B Leak
See continuation
Special Device
Section “B-B”
Section “C-C”
Drain Valve
11
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE “AIR COOLER” Heat Exchanger
2.3. On line Leak elimination:
from broken tube : [Temporary solution] [Bottom & Top row only] Stop the fan set only Erect scaffold below fan Remove fins at leaking area Install the upper half body with gasket
Steam
Install the lower half body with the drain open Tight the body bolts Install packing and gland at left side and tight bolts Condensate
Leak
Install packing and gland at right side and tight bolts Close the drain
DEVICE INSTALLATION METHOD
12
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE “AIR COOLER” Heat Exchanger
Handover & Final House Keeping
By Maintenance
Remove tools and equipment
Remove scaffold before El. Fan start-up
Clean and wash the area
Close Work permit
13
IBN-ZAHR
MECHANICAL MAINTENANCE PROCEDURE List of Air Coolers Installed in IBN-ZAHR PP PLANT
MTBE PLANT
Non 1.
110-E09 A-B
2. 110-E15 A-B-C-D
13. 130-E15 I-L-M-N 14. 130-E15 O-P
3. 110-E15 E-F-G-H 4. 110-E15 I-J-K-L
15. 130-E19 A-B
5. 110-E15 M-N-O-P
16. 140-E03 A-B
6. 110-E19 A-B
17. 140-E06 A-B
7. 120-E03 A-B 8. 120-E06 A-B
18. 220-E29 A-B
9. 200-E29 A-B
19. 220-E30 A-B-C-D-E-F
10. 130-E09 A-B
20. 740-E01
11. 130E15 A-B-C-D 12. 130-E15 E-F-G-H
21. 740-E02
13. 130-E15 I-L-M-N
22. 770-E03 A-B-C-D
The End