RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 1 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

PROJECT: CLIENT: LOCATION:

T-2260 RAPID REFINERY PROJECT PACKAGE 3 PETRONAS PENGERANG, JOHOR (MALAYSIA)

SUBCONTRACT:

2260-2520

BUILDINGS

INDEX I.

SYSTEM OF MEASUREMENT AND PAYMENT. A. OBJECT. B. UNIT PRICE CONTENT AND SYSTEM OF MEASUREMENT. 0. GENERAL. 1. DEMOLITIONS AND DISASSEMBLIES. 1.1. Demolitions. 1.2. Disassembly of Structures and Claddings. 2. SITE PREPARATION. 2.1. Grubbing and Clearing. 2.2. General Excavation. 2.3. General excavation in rock. 2.4. General backfilling and embankments. 3. PILING. 4. EARTHWORKS. 4.1. Deep excavation. 4.2. Trench Excavation. 4.3. Large Open Excavation. 4.4. Deep and trench excavation and/or gallery excavation with manual means. 4.5. Paving encasement. 4.6. Backfilling in trenches, foundations, and extrados of walls. 4.7. Backfilling with crushed granular material in tank bases. 4.8. Backfilling with bituminous mixture in tank bases. 4.9. Backfilling in dikes for pools and basins. 4.10. Spreading material in non-paving area. 4.11. Backfilling with granular material under concrete paving. 4.12. Backfilling with granular material for pavements, bases and subbases. 4.13. Loading, transport and unload to storage area outside the work site. 4.14. Loading, transport and unloading to external dumping area. 5. SMALL FOUNDATIONS. 5.1. Small foundations and thickened slab footing, made of “in situ” reinforced concrete. 5.2. Small foundations of precast concrete. 6. PRECAST CONCRETE STRUCTURES. 6.1. Supply and mounting in workshop of steel corrugated rebars in precast elements. 6.2. Supply and mounting in workshop of embedded elements in precast concrete. 6.3. Precast in workshop of reinforced concrete elements. 6.4. Supply and mounting in work site of concrete precast columns, beams and brackets. 6.5. “In situ” joints in precast reinforced concrete elements. 6.6. Precast reinforced concrete slabs floors. 7. IN SITU CONCRETE ELEMENTS. 7.1. Lean concrete. 7.2. Mass concrete.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 2 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

7.3. Reinforced concrete. 7.4. Reinforced concrete lining for dikes in pounds and/or basins. 7.5. Mortars and resins. 7.6. Formwork. 7.7. Falsework. 7.8. Lost formwork Deck type or similar. 7.9. Anchor boxes. 7.10. Rebars and welded wire mesh. 7.11. Steel objects and sliding plates to be embedded in concrete. 7.12. Anchor bolts. 7.13. Piping embedded in reinforced concrete for conduits or drainage. 7.14. Plastic sheets. 7.15. Bituminous paint in reinforced concrete elements. 7.16. Acid resistant protection with tiles and bricks. 7.17. Acid resistant protection with epoxi lining and polyureas. 7.18. Slopes protection with rockfill. 7.19. Slopes protection with Shotcrete. 7.20. “Water stop” joints. 7.21. Grounding bounding jumper. 8. CATCH BASINS, MANHOLES AND PITS. 8.1. Catch basins, manholes and pits with an Internal Volume ≤ 12 m3. 8.2. Clean outs. 8.3. Catch basins for sucking in tank rings. 8.4. Reinforced concrete covers of catch basin or channels (Vint>12m3). 8.5. Checkered / embossed steel plates or steel grating for channels and/or catch basins (Vint>12m3). 8.6. Metallic profiles in covers for channels and catch basins (Vint>12m3). 9. PAVINGS AND ROADS. 9.1. Concrete paving. 9.2. Paving finishing with corundum. 9.3. Ending kerb and heels in reinforced concrete pavings. 9.4. Asphalt courses. 9.5. Asphalt priming. 9.6. Precast kerb for sidewalks. 9.7. Concrete Sidewalks. 9.8. Tiled sidewalks. 9.9. Earthen gutters. 9.10. Reinforced concrete gutters. 9.11. Footways over gutters. 9.12. Asphalt paving repair. 9.13. Concrete paving repair. 10. UNDERGROUND PIPING AND ELECTRICAL. 10.1. Underground piping. 10.2. Warning system for underground conduits or pipes. 11. MANSONRY. 11.1. Drilled Openings. 11.2. Concrete blocks masonry. 11.3. Brick masonry. 11.4. Rough-cast. 11.5. Gypsum plastering. 11.6. Rendering. 11.7. Paints on walls. 11.8. False continuous ceiling.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 3 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

11.9. False registered ceiling. 11.10. False registered floor. 11.11. Wall and floor tile works. 11.12. Downspout and sewage network. 11.13. Roof gutters. 11.14. Metallic louver. 11.15. Pedestrian door. 11.16. Antipanic bar. 11.17. Industrial doors (rolling, overhead, sliding). 11.18. Windows. 12. URBANIZATION. 12.1. Gardening. 12.2. Vertical signposting. 13. FENCING. 13.1. Temporary fencing. 13.2. Permanent fencing. 13.3. Access elements in fencing 14. BUILDINGS AND INSTALLATIONS. 14.1. Buildings. 14.2. Transformer Yards. 14.3. Heat Ventilation and Air Conditioning (HVAC) system. 15. MISCELLANEOUS. 15.1. Geotextiles. 24. OTHER TYPES OF WORK UNITS. C. HOURLY RATES. 1. General. 2. Labor. 3. Machinery. 4. Material. II.

SCHEDULE OF RATES. 1. Unit Prices. 2. Hourly Rates.

I.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 4 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

SYSTEM OF MEASUREMENT AND PAYMENT.

A. OBJECT. The object of Technical Requisition II is to define the pricing structure, price content, system of measurement, and prices to apply to measurements obtained from drawings in all Civil Works activities performed by the Subcontractor in accordance with the awarded Scope Of Work. This system shall be applied to Subcontracts established by Unit Prices, as well as increases or decreases of quantities for Lump Sum Subcontracts. B. UNIT PRICE CONTENT AND SYSTEM OF MEASUREMENT. 0.

GENERAL. Measurements shall always be taken from specifications, Approved for Construction standards and drawings, and/or “as built” drawings whenever possible. If the Contractor’s Site Manager deems it necessary to take measurements in the field, these measurements shall be accomplished jointly with the Subcontractor and the results shall be accepted as valid.

1.

DEMOLITIONS AND DISASSEMBLIES. 1.1.

Demolitions. This is defined as the demolition of supports, walls, structures, buildings, pavements, concrete slabs, foots, etc. Price includes all work required for the demolition, shop machinery, auxiliary requirements (scaffolding, etc.), cutting and removal of rebar from reinforced concrete, loading and transporting of debris to an authorized exterior dump site (including all operations involved with the removal of debris from elevated work), intermediate storage, dumping fees, safety requirements in accordance with applicable standards and specifications, irrigation requirements and, in general, all required materials and labor for the correct completion of the required unit. For material that may be reused in the project, the price also includes cleaning, storage, and transport of the material in the manner directed by and to a location designated by Site Manager. The Unit of measure shall be as is stated in the Schedule of Rates, measured on approved drawings, and taking the following additional points into consideration: Demolition of mass concrete elements: When the unit of measure is the cubic meter (m3) it refers to the volume of concrete in each foundation, slab, or mass concrete, as measured on approved drawings. Demolition of foundations, slabs, footings, and equipment supports: When the unit of measure is the cubic meter (m3) it refers to the volume of concrete as measured on approved drawings, assigning lean concrete the same width as the base or footing which it supports. Demolition of structural elements (Walls, columns, beams, elevated slabs, and elevated supports): When the unit of measure is the cubic meter (m3) it

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 5 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

refers to the volume of concrete in each structural element above the upper surface of the foundation, and is measured on approved drawings. Demolition of buildings: When the unit of measure is the cubic meter (m3) it is referring to the interior volume that each building encloses, as measured from the inside of the roof (interior) to the upper surface (interior) of the bottom floor or basement and measured on approved drawings. Regardless of the unit of measurement, the unit price includes the demolition of foundations and underground systems. 1.2.

Disassembly of Structures and Claddings. Price includes all work required for the disassembly, including shop machinery, auxiliary requirements (scaffolding, etc.), loading and transportation of debris to an authorized external dump site (including all operations involved with the removal of debris from elevated work), intermediate storage, dumping fees, safety requirements in accordance with applicable standards and specifications, irrigation requirements and, in general, all required materials and labor for the correct completion of the required unit. For material that may be reused in the project, the price also includes cleaning, storage, and transport of the material in the manner directed by and to a location designated by Site Manager. The Unit of measure shall be as established in the Schedule of Rates, measured on approved drawings.

2.

SITE PREPARATION. 2.1.

Grubbing and Clearing. The unit price includes the transport of machinery to and within the job site, positioning time for machinery, cleaning, ripping, excavation of the surface grade, intermediate storage, removal of the upper cover of the explanation to an authorized external dump area (including trees, stumps, plants, underbrush, fall wood, and all types of undesirable material) safety requirements and dumping fees. For earth that may be reused in the project, the price also includes cleaning, storage, and transport of the material to the location and in the manner specified by Contractor’s Site Manager. When required, the unit price also includes all timbering and shoring, and drainage of the terrain by whatever means is appropriate. Volume will be measured in its natural state as defined on reference drawings and topographic profiles. Any swelling, any excavation apart from those specified on applicable drawings, or any excavation for the removal of tree stumps and roots shall not be measured nor paid. The unit of measurement shall be in square meters (m2).

2.2.

General Excavation. General excavation is defined as the excavation, leveling, and removal of all material located above the finished grade by normal mechanical means.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 6 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

Unit Price includes the transport of machinery to and within the job site, positioning time for machinery, ripping, excavating, leveling, slope refining, irrigation, compaction as per specifications, safety requirements, and intermediate storage within the work site in the location specified by the Contractor’s Site Manager. For earth that may be reused in the project, the price also includes cleaning, storage, and transport of the material to the location and in the manner specified by Contractor’s Site Manager. When required, the unit price also includes all timbering and shoring, and drainage of the terrain by whatever means is appropriate. Volume for excavation shall be measured in its natural state as is stated on approved reference plans and topographic profiles. Any swelling, any additional widening of grades, or any slopes that differ from the specifications listed on applicable drawings, shall not be measured nor paid. The unit of measure shall be cubic meters (m3). 2.3.

General excavation in rock. Refers to all excavations and leveling performed in rock above the finishing grade using explosives, hydraulic mortars, wedges, drills and/or hydraulic hammer. The Contractor’s Site Manager will define the necessary proof and tests for the determination of the required excavation. The unit price includes preliminary excavation tests, permits, licenses, notifications to local authorities, administrative procedures, required preliminary project manual, transport of machinery to and within the job site, positioning time for machinery, excavation, leveling, refining of slopes, compaction as per specifications, materials (explosives, mortars, wedges, hydraulic hammer, etc.), special machinery, safety requirements, and intermediate storage within the work site in the location specified by the Contractor’s Site Manager. For material that may be reused in the project, the price also includes cleaning, storage, and transport of the material to the location and in the manner specified by Contractor’s Site Manager. When required, the unit price also includes all timbering and shoring, and drainage of the terrain by whatever means is appropriate. Excavated volume will be measured in its natural state as shown on approved reference drawings and topographical profiles. Any swelling, any additional widening of grades, as well as any slopes that differ from the specifications listed on applicable drawings, shall not be measured nor paid. The unit of measurement shall be the cubic meter (m3).

2.4.

General backfilling and embankments. This work unit refers to excavations for large open areas to create a work explanation in required level.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 7 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

Unit Price includes material supply, transport and intermediate storage within the work site, machinery, spreading and compaction of backfill in layers, irrigation, refining of the surface finish grade, refining of slopes, auxiliary means, safety requirements, in general, all required materials and labor for the correct completion of the required unit. The filling volume shall be measured as specified on approved drawings and the unit of measure shall be the cubic meter (m3). Backfilling due to any additional widening of grades, any slopes that are not as specified on approved drawings as well as the removal of excess material from construction of slopes, shall not be measured nor paid. 3.

PILING. Cut off and Plug. Even if this unit is executed by hand or with specialize machinery, this unit price includes machinery transport, intermediate movements, cutting and conditioning of reinforcement, load and transport of all the demolished material to an authorized exterior dump site, auxiliary means, tool and, in general, all materials and labor for the correct completion of the required unit. The plug of the piles will be executed in accordance with the provided detail. At the end of the works, the rebar has to be clean and in the right position. The unit of measurement shall be the unit (n) of piles as state in approved drawings.

4.

EARTHWORKS. 4.1.

Deep excavation. This refers to depth excavations for foundations, catch basins, pits, etc., performed below the elevation of the finishing grade with the machine shall be located outside of the area to be excavated. Unit Price includes transport of machinery to and within the job site, the positioning time for machinery, cutting and ripping, excavating, leveling, slope refining, irrigation, compaction as per specifications, safety requirements, and intermediate storage within the work site in the location specified by the Contractor’s Site Manager. When the excavation is performed in rock, the price also includes preliminary excavation tests, permits, licenses, notifications to local authorities, administrative procedures, required preliminary project manual, materials (explosives, mortars, wedges, hydraulic hammer, etc.), and special machinery. Rock excavation refers to the excavation executed with explosives, hydraulic mortar, wedges, drillings and/or hydraulic hammer, as specified by

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 8 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

Contractor Site Manager, who will decide the test to be carried out for the required excavation. For material that may be reused in the project, the price also includes cleaning, storage, and transport of the material to the location and in the manner specified by Contractor’s Site Manager. When required, the unit price also includes all timbering and shoring, and drainage of the terrain by whatever means is appropriate. Excavated volume will be measured in its natural state as shown on approved reference plans and topographical profiles, and measuring the sidewalls of the excavated area as vertical. Any swelling, any additional widening of grades, as well as any slopes that are not as specified on approved drawings, shall not be measured nor paid. The unit of measurement shall be the cubic meter (m3). 4.2.

Trench Excavation. This is defined as deep linear excavations for conduits, utilities, gutters, etc. Unit Price includes transport of machinery to and within work site, the positioning time for machinery, cutting and ripping, excavating, leveling, slope refining, irrigation, compaction as per specifications, safety requirements, and intermediate storage within the work site in the location specified by the Contractor’s Site Manager. When the excavation is performed in rock, the price also includes preliminary excavation tests, permits, licenses, notifications to local authorities, administrative procedures, required preliminary project manual, materials (explosives, mortars, wedges, hydraulic hammer, etc.), and special machinery. For material that may be reused in the project, the price also includes cleaning, storage, and transport of the material to the location and in the manner specified by Contractor’s Site Manager. When required, the unit price also includes all timbering and shoring, and drainage of the terrain by whatever means is appropriate. The unit of measurement shall be the cubic meter (m3) and excavated volumes will be measured in their natural state as shown on approved reference plans and measuring the sidewalls of the excavated area as vertical, except for conduits with diameter greater than 1,600 mm (see table). Any swelling, any excavation above those specified on plans, as well as any additional widths which differs from the table below, shall not be measured nor paid.

Diameter of the conduit (mm)

Up to 150 ≥ 151 to 300

Additional Width (S) allowance for each side of the conduit (cm)

Angle of slope

10 15

Vertical Vertical

S

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 9 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

≥ 301 to 500 ≥ 501 to 900 ≥ 901 to 1.600 ≥ 1.601 to 2.400 ≥ 2.401

20 30 45 60 90

Vertical Vertical Vertical To be agreed on. To be agreed on.

When laying a group of pipes, the values listed above apply to the pipes located at the extreme right and left of the group. Additional width values will not apply to the following: 4.3.

Trenches for cables that do not require cable sleeves. Trenches for grounding electrical networks. Concrete lined trenches. Trenches with no conduits installed.

Large Open Excavation. This work unit refers to excavations for large open areas, basins, trenches, and foundations of great proportion, etc. performed below the elevation of the finish grade, with the machine located within the area to be excavated. Unit Price includes the transport of machinery to and within the job site and the positioning time for machinery, cutting and ripping, excavating, leveling, slope refining, irrigation, compaction as per specifications, safety requirements, and intermediate storage within the work site in the location specified by the Contractor’s Site Manager. When the excavation is performed in rock, the price also includes preliminary excavation tests, permits, licenses, notifications to local authorities, administrative procedures, required preliminary project manual, materials (explosives, mortars, wedges, hydraulic hammer, etc.), and special machinery. For material that may be reused in the project, the price also includes cleaning, storage, and transport of the material to the location and in the manner specified by Contractor’s Site Manager. When required, the unit price also includes all timbering and shoring, and drainage of the terrain by whatever means is appropriate. Excavated volume will be measured in its natural state as shown on approved reference plans and topographical profiles. Any swelling, any additional widening of grades, as well as any slopes that are not as specified on approved drawings, shall not be measured nor paid. The unit of measurement shall be the cubic meter (m3).

4.4.

Deep and trench excavation and/or gallery excavation with manual means. This Unit Price includes cutting and ripping, excavating, leveling, slope refining, irrigation, compaction as per specifications, tools and manual equipment, safety requirements, and intermediate storage within the work site in the location specified by the Contractor’s Site Manager.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 10 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

For material that may be reused in the project, the price also includes cleaning, storage, and transport of the material to the location and in the manner specified by Contractor’s Site Manager. When required, the unit price also includes all timbering and shoring, and drainage of the terrain by whatever means is appropriate. Excavated volume will be measured in its natural state as shown on approved reference plans and measuring the sidewalls of the excavated area as vertical. Any swelling, any additional widening of grades, as well as any slopes that are not as specified on approved drawings, shall not be measured nor paid. The unit of measurement shall be the cubic meter (m3). 4.5.

Paving encasement. This Unit Price includes the transport of machinery to and within the job site and the positioning time for machinery, cutting and ripping, excavating, leveling, slope refining, irrigation, compaction as per specifications, safety requirements, and intermediate storage within the work site in the location specified by the Contractor’s Site Manager. When the excavation is performed in rock, the price also includes preliminary excavation tests, permits, licenses, notifications to local authorities, administrative procedures, required preliminary project manual, materials (explosives, mortars, wedges, hydraulic hammer, etc.), and special machinery. For material that may be reused in the project, the price also includes cleaning, storage, and transport of the material to the location and in the manner specified by Contractor’s Site Manager. When required, the unit price also includes all timbering and shoring, and drainage of the terrain by whatever means is appropriate. Excavated volume will be measured in its natural state as shown on approved reference plans and measuring the sidewalls of the excavated area as vertical. Any swelling, any additional widening of grades, as well as any slopes that are not as specified on approved drawings, shall not be measured nor paid. The unit of measurement shall be the cubic meter (m3).

4.6.

Backfilling in trenches, foundations, and extrados of walls. The unit price includes material supply, transportation, intermediate storage, spreading of backfill in layers, irrigation requirements, compaction of these layers, leveling, grading and compaction of surface finish grade, refining of slopes, required machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. The filling volume shall be measured as specified on approved drawings and the unit of measure shall be the cubic meter (m3). Backfilling due to any additional widening of grades, any slopes that are not as specified on approved drawings as well as the removal of excess material from construction of slopes, shall not be measured nor paid

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 11 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

4.7.

Backfilling with crushed granular material in tank bases. The unit price includes material supply, transportation, intermediate storage, access ramp, spreading of backfill in layers, irrigation requirements, compaction of these layers, leveling, grading and compaction of surface finish grade, refining of slopes, required machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. The filling volume shall be measured as specified on approved drawings and the unit of measure shall be the cubic meter (m3). Backfilling due to any additional widening of grades that are not as specified on approved drawings as well as the removal of excess material due to refining, shall not be measured nor paid

4.8.

Backfilling with bituminous mixture in tank bases. The unit price includes material supply, transportation, intermediate storage, spreading, compaction, required machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. The filling volume shall be measured as specified on approved drawings and the unit of measure shall be the cubic meter (m3).

4.9.

Backfilling in dikes for pools and basins. The unit price includes material supply, transportation, intermediate storage within the work site, machinery, spreading and compaction of backfill in layers, irrigation requirements, refining of surface finish grade and slopes, auxiliary means and, in general, all required materials and labor for the correct and completion of all work. The unit of measure shall be the cubic meter (m3) as stated on approved drawings. Backfilling due to unauthorized excavations or slopes, and the removal of excess material due to refining, and any other item not specified here is not be measurable and shall not be paid.

4.10.

Spreading material in non-paving area. The unit price includes material supply, transportation, intermediate storage within the work site, machinery, spreading, irrigation, auxiliary means, safety resources and, in general, all required materials and labor for the correct and completion of all work. The unit of measure shall be the cubic meter (m3) as stated on approved drawings. Backfilling due to unauthorized excavations or slopes, removal of excess material due to refining, and any other item not specified here is not measurable and shall not be paid.

4.11.

Backfilling with granular material under concrete paving. The unit price includes supply, transportation, intermediate storage, spreading, irrigation, compaction, machinery, auxiliary means and, in

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 12 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

general, all required materials and labor for the correct completion of all work. The filling volume shall be measured as specified on approved drawings and the unit of measure shall be the cubic meter (m3). Filling or backfilling due to any additional widening of grades that are not as specified on approved drawings as well as the removal of excess material from refining, shall not be measured nor paid. 4.12.

Backfilling with granular material for pavements, bases and subbases. The unit price includes supply, transportation, intermediate storage, spreading, irrigation, compaction, grading, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. The filling volume shall be measured as specified on approved drawings and the unit of measure shall be the cubic meter (m3). Backfilling due to any additional widening of grades that are not as specified on approved drawings as well as the removal of excess material from sloping, shall not be measured nor paid.

4.13.

Loading, transport and unload to storage area outside the work site. The unit price includes the loading, transport, and unloading of excess excavated material. Unloading should be outside of work site but within owner property bounds and within an authorized storage area. The unit of measure shall be the cubic meter (m3), measured as the difference between the excavated volume and the backfilling material from the excavation, in accordance with the system of measurement and payment. Bulking, swelling, or any increase in volume the material may experience during its transport, is not measurable and shall not be paid.

4.14.

Loading, transport and unloading to external dumping area. The unit price includes the loading, transport, unloading of excess excavated material in an authorized external dumping area, all costs associated with the obtaining of dumping permits, any dumping fees, maintenance and preparation of material, etc. The unit of measure shall be the cubic meter (m3), measured as the difference between the excavated volume and the backfilling material from the excavation, in accordance with the system of measurement and payment. Bulking, swelling, or any increase in volume the material may experience during its transport, is not measurable and shall not be paid.

5.

SMALL FOUNDATIONS. 5.1.

Small foundations and thickened slab footing, made of “in situ” reinforced concrete. This system of measurement and payment only concerns to small foundations (foots, sleepers, pipe and stair supports, etc.) and thickened slab footing to support equipment and pipes which volume is up to 1 m3.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 13 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

When the volume exceeds 1 m3, the small foundation shall be measured and paid according with the unit prices of the different components (excavation, filling, concrete, reinforcement, formwork, embedded elements, etc.) The price includes material supply, work laying out and plotting , demolitions, excavations, fillings, loading and transporting of excess material to a dumping area, dumping fees, formwork, rebar, embedded elements, anchor bolts, concrete works, mortars, auxiliary means, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measurement is the element executed (n), as is stated on approved drawings. 5.2.

Small foundations of precast concrete. This system of measurement and payment only concerns to small foundations (foots, sleepers, pipe and stair supports, etc.) which volume is up to 1 m3. The price includes material supply, work layout and plotting, demolitions, excavations, fillings, loading and transporting of excess material to a dumping area, dumping fees, embedded elements, anchor bolts, mortars, auxiliary means, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measurement is the element executed (n), as is stated on approved drawings.

6.

PRECAST CONCRETE STRUCTURES. 6.1.

Supply and mounting in workshop of steel corrugated rebar in precast elements. El unit price includes material workshop supply, transports and intermediate storage, fabrication (cutting and bending), mounting, manpower, tools, machinery, and, in general, all required materials and labor for the correct completion of all work. Spacers, any type, auxiliary items, restraining cable, overlaps and cutting are not measured and shall not be paid. Rebar for lap splicing will be considered as part of the structural element they belong. The unit of measure shall be the kilogram (kg), measured as is stated on approved drawings.

6.2.

Supply and mounting in workshop of embedded elements in precast concrete. The unit price includes supply of material in workshop, prefabrication, surface preparation (blasting), primer, installation, accurate surveying, temporary supports prior to concrete pouring, all templates (except for the turbines), drillings, formation of threaded holes, and any other requirement,

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 14 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

regardless of nature, necessary for the correct installation of the required unit. Excesses due to cuttings or cropping of material, excessive lamination, ancillary assembling, or any other temporary material or process are not measurable and therefore not chargeable. Neither the embedded elements for knots execution are measured nor paid. The unit of measure shall be expressed in kilograms (kg), measured on approved drawings, and applying weight as specified in the manufacturer’s catalog. When these weights are not specified, weight shall be calculated applying the density of 7.85 t/m3. 6.3.

Precast in workshop of reinforced concrete elements. El unit price includes material supply in workshop, works layout and plotting, formwork, concrete works, vibrating, curing, removal of formwork, storage, protection, custody and, in general, all required materials and labor for the correct completion of all work. Rebar and embedded elements shall be measured and paid according with their unitary prices. The unit of measure shall be the cubic meter of executed element (m3), measured as is stated on approved drawings.

6.4.

Supply and mounting in work site of concrete precast columns, beams and brackets. The unit price includes material supply, intermediate storage, surveying, machinery, temporary shoring, beam-foot encastered (cleaning, non-shrink mortar, etc.) and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be the cubic meter of executed element (m3), measured as is stated on approved drawings.

6.5.

“In situ” joints in precast reinforced concrete elements. The unit price includes material supply, cleaning and surface preparation, formwork, rebar, embeddings, epoxy material, special mortars, concreting, vibrating, curing, removal of formwork, machinery, tools, auxiliary means, temporary shoring, and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be the cubic meter of executed element (m3), measured as is stated on approved drawings.

6.6.

Precast reinforced concrete slabs floors. The unit price includes material supply, epoxy material, special mortars, plate-structure joints, openings, compression layer, machinery, tools, auxiliary means, temporary shoring and, in general, all required materials and labor for the correct completion of all work.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 15 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

The unit of measurement is the square meter (m2) in accordance with the approved drawing and discounting holes greater than 1m2 (concrete block stairways are not discounted)

7.

IN SITU CONCRETE ELEMENTS. 7.1.

Lean concrete. The unit price includes material supply, pouring by any means, spreading, leveling, curing, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be the cubic meter (m3) as is stated on approved drawings and it is measured assigning the same surface as the foundation that is supported. Excess of in width is not measurable and shall not be paid (even if it is shown in approved drawings).

7.2.

Mass concrete. The unit price includes supply of material, pouring by any means, spreading, vibrating, leveling, curing, finishing of surfaces, repair of any defect that concrete may have, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measurement is cubic meter (m3), as is stated on approved drawings,

7.3.

h<1m

Reinforced concrete. For invoicing purposes, it is considered as foundation all structural elements in contact with soil that transmit to the ground the loads of the supported structures or equipment (foots, tie beams, footings for piling, slabs, etc.). Columns and walls less than 1 meter high (measured from the upper side of the foot) shall be considered as foundations:

foundation

h≥1m

column / wall

foundation For measuring purposes, lining of trenches, piping and equipment supports, sleepers, paving thickened slab footing, and pedestal for stairs and nonelevated pedestal for turbines shall not be considered as foundations. The unit price includes supply of material, pouring by any means, spreading, vibrating, leveling, curing, finishing of surfaces, repair of any defect that concrete may have, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measurement is cubic meter (m3), as is stated on approved drawings.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 16 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

7.4.

Reinforced concrete lining for dikes in pounds and/or basins. The unit price includes supply, mesh installation, pouring by any means, spreading, vibrating, leveling, curing, finishing of surfaces, repair of any defect that concrete may have, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measurement is square meter (m2) of external lining of concrete surface, measured on approved drawings.

7.5.

Mortars and resins. The unit price includes supply, application, preparation, supports, pouring mediums, formwork (except for anchor pockets), and any other requirement, regardless of nature, necessary for the correct installation of the required unit. The unit of measurement is cubic meter (m3), as is stated on approved drawings.

7.6.

h<1m

Formwork. For invoicing purposes, it is considered as foundation all structural elements in contact with soil that transmit to the ground the charges of the supported structures or equipment (foots, tie beams, footings for piling, slabs, etc.). Formworks of columns and walls less than 1 meter high (measured from the upper side of the foot) shall be considered as foundations:

foundation

h≥1m

column / wall

foundation For measuring purposes, lining of trenches, piping and equipment supports, sleepers, paving thickened slab footings, pedestal for stairs and nonelevated pedestal for turbines shall not be considered as foundations. The unit price includes all aspects of prefabrication of the required material, supply, layout works and plotting, installation, shoring, bracing, removal of formwork, cleaning and preparation of surface formwork for subsequent work, manpower, any material costs including any proportional part of cost for use of material, formwork for corners and molding, interior and exterior curvature formwork, drip edges, sealing works, all accessories, all required fastening material (i.e. nails, bolts, etc.), hand tools, workshop machinery and, in general, all required materials and labor for the correct completion of all work. For measuring purposes, the price includes the part of formwork used for safety requirements, holes, access ways, etc. The unit of measure shall be square meter (m2) of formwork in contact with concrete, and measured on approved drawings.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 17 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

7.7.

Falsework. Falsework is a special structure used to support elevated formwork. The falsework shall be approved by Contractor’s Site Manager. The price includes prefabrication, supply, layout works and plotting, installation, shoring, bracing, removal of arch centering, cleaning and preparation, accessories, material for fastening, hand tools, machinery and, in general, all required materials and labor for the correct completion of all work. This unit shall be measured and charged by apparent cubic meter (m3). For measuring purposes, it will only be considered the horizontal projection of the formwork for the item to be arch centered. All costs arising from the false work required for safety issues, openings and others, must be included in the unit price. Those falseworks which support different structural elements will be measured only once.

7.8.

Lost formwork Deck type or similar. The unit price includes material supply, laying out and plotting, installation, shoring, bracing, manpower, accessories, material for fastening, connectors, trimming elements, tools, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be square meter (m2) of formwork in contact with concrete, and measured on approved drawings.

7.9.

Anchor boxes. The unit price includes layout works and plotting, supply and installation of formworks, removal of formworks, all required hand tools and accessories, auxiliary means, machinery, and any other requirement, regardless of nature, necessary for the correct installation of the required unit. The unit of measure shall be cubic decimeter (dm3) of anchor boxes executed, as is stated on approved drawings.

7.10.

Rebar and welded wire mesh. The unit price includes material supply, intermediate storage and transport, labor costs (cutting and bending), installation, manpower, tools, machinery and, in general, all required materials and labor for the correct completion of all work. Spacers, any type, auxiliary items, restraining cable, overlaps, cutting and cropping are not measurable and shall not be paid. The unit of measure shall be kilogram (kg), as is stated on approved drawings.

7.11.

Steel objects and sliding plates to be embedded in concrete. The unit price includes supply of material, prefabrication, surface preparation (blasting), primer, and installation, accurate surveying, temporary supports prior to concrete pouring, all templates, drillings (screw and machine type

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 18 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

included), formation of threaded holes, and any other requirement, regardless of nature, necessary for the correct installation of the required unit. Excesses due to cuttings or cropping, excessive lamination, ancillary assembling, or any other temporary material or process are not measurable and therefore not chargeable. The unit of measure shall be expressed in kilograms (kg), measured on approved drawings, and applying weight as specified in the manufacturer’s catalog. When these weights are not specified, weight shall be calculated applying the density of 7.85 t/m3. 7.12.

Anchor bolts. Anchor bolts. The unit price includes fabrication, supply, installation, all related accessories (i.e. sleeves, nuts, washers, etc.), accurate surveying, templates (except for turbines), drillings (screw and machine type included), temporary supports, protections, labeling and any other requirement, regardless of nature, necessary for the correct complete installation of the required unit. The unit of measure shall be kilograms (kg), measured on approved drawings, and applying weight as specified in the manufacturer’s catalog. When these weights are not specified, weight shall be calculated applying the density of 7.85 t/m3. Expansion and chemical anchor bolts, Hilti model or similar item. Unit price includes the supply, layout works and plotting, surface cleaning, drilling, and installation in hardened concrete. Unit price for chemical anchor bolts also includes all accessories required for installation. The unit of measure shall be the installed anchor bolt, in accordance with applicable drawings.

7.13.

Piping embedded in reinforced concrete for conduits or drainage. The unit price includes the material supply, installation, layout works and plotting, temporary supports, accessories, joints (elastic joint can be glued or not), lubricants, hand tools, auxiliary means and, in general, all required materials and labor for the correct completion of all work. In case of conduits, unit price shall include the supply and erection of cable pulling guides. The unit of measure shall be the lineal meter to axes of the pipeline (lm) of correctly installed piping, as specified on approved drawings.

7.14.

Plastic sheets. The unit price includes material supply, manpower, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 19 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

The unit of measure is the square meter (m2) of the supported element as specified on approved drawings. 7.15.

Bituminous paint in reinforced concrete elements. The unit price includes material supply, manpower, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings,

7.16.

Acid resistant protection with tiles and bricks. The unit price includes layout works and plotting, material supply, manpower, surface preparation (cleaning, epoxi and polyester resin grouting, potassium silicate mortar, etc.), trimming, formation and sealing of joints (polyisobutylene, epoxy sealing, etc.) sealing of joints between tiles with polyester resin, tools, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings.

7.17.

Acid resistant protection with epoxi lining and polyureas. The unit price includes layout works and plotting, material supply, manpower, surface preparation, trimming, formation and sealing of joints, tools, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings.

7.18.

Slopes protection with rockfill. The unit price includes material supply, manpower, geotextiles, tools, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the cubic meter (m3) as specified on approved drawings.

7.19.

Slopes protection with Shotcrete. The price includes material supply, manpower, net, tools, machinery, auxiliary means and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings.

7.20.

“Water stop” joints. The price includes material supply, installation, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 20 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

The unit of measure is the lineal meter (lm) as specified on approved drawings. 7.21.

Grounding bounding jumper. The price includes material supply, installation, connection to reinforcement or other elements (clamp o Cadweld welding), tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the unit (n) of grounding bounding jumper installed, as specified on approved drawings.

8.

CATCH BASINS, MANHOLES AND PITS. 8.1.

Catch basins, manholes and pits with an Internal Volume ≤ 12 m3. The unit price includes the material supply, layout works and plotting, excavation, backfill, formation of lean concrete base, plaster coating on interior and polishing (on block and brick pits), repair of damages (in concrete), sloping of the interior (bottom) of the pit, framing, covers (made of concrete, steel or cast), embeddings, steel rungs, anchorage, surface preparation (blasting), priming and paint of steel elements, sleeves for conduits (when the conduits are within the scope of work of the Subcontractor), all required hand tools and machinery, auxiliary and secondary equipment (scaffolding, etc.) and any other requirement, regardless of nature, necessary for the correct installation of the required unit. The unit of measure is cubic meter (m3) of concrete used for the catch basin, manhole or pit, as is stated on approved drawings. The cubic meter (m3) unit rate shall be considered as an all-inclusive rate, including all above mentioned items. The cubic meter (m3) shall be determined as stated on approved drawings, calculating only the reinforced concrete, excluding lean or mass concrete mentioned on the approved drawings.

8.2.

Clean outs. The unit price includes the supply of materials, layout works and plotting, excavation, filling and any other requirement, regardless of nature, necessary for the correct installation of the required unit. (for any type of clean outs) The unit of measure is each installed clean out (n), as is stated on approved drawings.

8.3.

Catch basins for sucking in tank rings. The price includes supply, laying out and plotting, demolitions, excavations, backfilling, formworks, reinforcements, concreting, auxiliary means, tools, machinery and any other requirement, regardless of nature, necessary for the correct installation of the required unit. The unit of measure is each installed catch basin (n), as is stated on approved drawings.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 21 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

8.4.

Reinforced concrete covers of catch basin or channels (Vint>12m3). This unit price refers to covers of catch basins which exceed the internal volume of 12 m3 as well as the cover of channels. This unit price includes material supply, work lay out and plotting, assembly, formworks, metallic elements, embeddings (blasting + priming + paint), hand tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be the square meter (m2) of cover correctly performed, measured on approved drawings

8.5.

Checkered / embossed steel plates or steel grating for channels and/or catch basins (Vint>12m3). This unit price refers to the cover of catch basins which exceed the internal volume of 12 m3 as well as the cover of channels. This unit price includes material supply, surface treatment (blasting + priming / hot dip galvanizing), finishing surface paint, special pieces, accessories, general repair (priming/galvanizing, paint, damages, welding, etc.) and, in general, all required materials and labor for the correct completion of all work. Excesses due to cuttings or cropping of material, excessive lamination, welding, bolts and any other any item for the correct completion of the work are not measured nor paid. The unit of measure shall be expressed in kilograms (kg), measured on approved drawings, and applying weight as specified in the manufacturer’s catalog. When these weights are not specified, weight shall be calculated applying the density of 7.85 t/m3. Holes greater than 1 m2 shall not be measured nor paid.

8.6.

Metallic profiles in covers for channels and catch basins (Vint>12m3). This unit price refers to metallic profiles covers of catch basins and channels which exceed the internal volume of 9 m3. Metallic profile embedded in concrete are no included and shall be measured according with the standard of measurement and payment. This unit price includes material supply, surface treatment (blasting + priming / hot dip galvanizing), finishing surface paint, special pieces, accessories, machinery, tools, auxiliary means general repair (priming/galvanizing, paint, damages, welding, etc.) and, in general, all required materials and labor for the correct completion of all work. Excesses due to cuttings or cropping of material, excessive lamination, welding, bolts and any other any item for the correct completion of the work are not measured nor paid. The unit of measure shall be expressed in kilograms (kg), measured on approved drawings, and applying weight as specified in the manufacturer’s

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 22 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

catalog. When these weights are not specified, weight shall be calculated applying the density of 7.85 t/m3. 9.

PAVINGS AND ROADS. 9.1.

Concrete paving. The unit price includes material supply, mesh installation, formwork, removal of formwork, concrete pouring by any mean, spreading, vibrating, leveling, curing, slope forming, floating, troweling, forming and sealing of joints, tools, auxiliary means, machinery, and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be the square meter (m2), as specified on the approved drawing. Holes greater than 1 m2 (pillars, foots, catch basin, sinks, etc) shall not be measured nor paid.

9.2.

Paving finishing with corundum. The unit price includes material supply, application, tools, auxiliary means, machinery, and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be the square meter (m2), as specified on the approved drawing. Holes greater than 1 m2 (pillars, foots, catch basin, sinks, etc) shall not be measured nor paid.

9.3.

Ending kerb and heels in reinforced concrete pavings. The unit price includes material supply, excavation, filling, load and transport to dumping area, dumping fees, compaction, mesh installation, formwork, removal of formwork, concrete pouring by any means, spreading, vibrating, leveling, curing, floating, troweling, forming and sealing of joints, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the lineal meter (lm) of outer face of the element, as specified on the approved drawing.

9.4.

Asphalt courses. The unit price includes the material supply, spreading by any means, compaction, forming and sealing joints, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measures is the square meter (m2), as specified on the approved drawings. Holes greater than 1 m2 (pillars, foots, catch basin, sinks, etc) shall not be measured nor paid.

9.5.

Asphalt priming. The unit price includes material supply, installation, surface treatment, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 23 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

The unit of measure is the square meter (m2) as specified on approved drawings. Holes greater than 1 m2 (pillars, foots, catch basin, sinks, etc) shall not be measured nor paid. 9.6.

Precast kerb for sidewalks. The unit price includes material supply, excavation, backfilling, load and transport to dumping area, dumping fees, compaction, lean concrete, special pieces and accessories, sealing of joints, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the lineal meter (lm) as specified on approved drawings.

9.7.

Concrete Sidewalks. The unit price includes material supply, excavation, backfilling, loading and transporting to an authorized dumping area, dumping fees, compaction, granular base, polyethylene layer, mesh installation, formwork, removal of formwork, concrete pouring by any mean, spreading, vibrating, leveling, curing, sloping, floating, troweling, surface finishing, kerb forming, forming and sealing of joints, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings. Holes greater than 1 m2 (columns, foots, catch basin, sinks, etc) shall not be measured nor paid.

9.8.

Tiled sidewalks. The unit price includes material supply, excavation, backfilling, loading and transporting to an authorized dumping area, dumping fees, compaction, granular base, mortar, tiling works, sloping, sealing of joints, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings. Holes greater than 1 m2 (columns, foots, catch basin, sinks, etc) shall not be measured nor paid.

9.9.

Earthen gutters. The unit price includes material supply, excavation, backfilling, refining, loading and transporting to an authorized dumping area, dumping fees, compaction, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the lineal meter (lm) as specified on approved drawings.

9.10.

Reinforced concrete gutters. The unit price includes material supply, excavation, backfilling, refining, loading and transporting to an authorized dumping area, dumping fees, compaction, mesh installation, formwork, removal of formwork, concrete pouring by any mean, spreading, vibrating, leveling, curing, forming and

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 24 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

sealing of joints, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the lineal meter (lm) as specified on approved drawings. 9.11.

Footways over gutters. The unit price includes material supply, excavation, refining, backfilling, loading and transporting to an authorized dumping area, dumping fees, compaction, piping, mesh installation, formwork, removal of formwork, concrete pouring by any mean, spreading, vibrating, leveling, curing, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the lineal meter (lm) to footway axes as specified on approved drawings.

9.12.

Asphalt paving repair. The unit price includes material supply, excavation, backfilling, loading and transporting to an authorized dumping area, dumping fees, granular bases, compaction, irrigation, asphalt priming (tack coat), compaction, sloping, forming and sealing of joints, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings. Holes greater than 1 m2 (columns, foots, catch basin, sinks, etc) shall not be measured not paid.

9.13.

Concrete paving repair. The unit price includes material supply, excavation, backfilling, loading and transporting to an authorized dumping area, dumping fees, compaction, granular base, polyethylene layer, mesh installation, formwork, removal of formwork, concrete pouring by any mean, spreading, vibrating, leveling, curing, sloping, floating, troweling, surface finishing, kerb forming, forming and sealing of joints, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings. Holes greater than 1 m2 (columns, foots, catch basin, sinks, etc) shall not be measured not paid.

10. UNDERGROUND PIPING AND ELECTRICAL. 10.1.

Underground piping. This unit price includes the material supply, layout works and plotting, wedges, spacers, special pieces, accessories, joints (elastic joints could be glued or not), lubricants, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. In case of conduits, unit price shall include the supply and erection of cable pulling guides.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 25 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

In case pressure piping and Glass Fiber Piping (GRP), the unit price shall include hydrotesting, execution of chemical joints/chemical lamination, pumping and measuring equipment, dismantling and reinstallation of sensitive accessories, supply, installation and dismantling of temporal accessories (blind caps, temporary spools, filters, etc.) The unit of measure shall be the lineal meter (lm) of piping correctly installed, theoretical measurement in approved drawings considering the axes of the pipe. 10.2.

Warning system for underground conduits or pipes. The unit price includes the material supply, installation, overlaps, tools, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be the square meter (m2) of warning system installed, as specified on approved drawings, multiplying the width by the length.

11. MASONRY. 11.1.

Drilled Openings. Price includes layout works and plotting, drilling equipment (including transportation to job site, positioning and repositioning, spare parts, etc.), supply of electricity and water from work site connection points, loading and transportation of debris to an authorized external dump site (including all operations required for the removal of debris of high altitude work), dumping fees and permits, auxiliary requirements (scaffolding, etc.) and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be as established in the Schedule of Rates (Unitary Prices). Only items actually completed by the Subcontractor, as measured on approved drawings, shall be chargeable.

11.2.

Concrete blocks masonry. The unit price includes the layout works and plotting, material supply, manpower, formation and sealing of joints, joint cleaning and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

11.3.

Brick masonry. The unit price includes the layout works and plotting, material supply, manpower, formation and sealing of joints, joint cleaning, lintels, machinery, tools, auxiliary means (scaffolding, etc.) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 26 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

11.4.

Rough-cast. The unit price includes layout works and plotting, material supply, manpower, machinery, tools, auxiliary means (scaffolding, etc) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

11.5.

Gypsum plastering. The unit price includes layout works and plotting, material supply, manpower, machinery, tools, auxiliary means (scaffolding, etc) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

11.6.

Rendering. The unit price includes layout works and plotting, material supply, manpower, joints, sealing works, machinery, tools, auxiliary means (scaffolding, etc) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

11.7.

Paints on walls. The unit price includes layout works and plotting, material supply, manpower, surface preparation, machinery, tools, auxiliary means (scaffolding, etc) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

11.8.

False continuous ceiling. The unit price includes layout works and plotting, material supply, manpower, framing system, holes for luminaries, sealing works, machinery, tools, auxiliary means (scaffolding, etc.) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes for luminaries are not discounted from measurement.

11.9.

False registered ceiling. The unit price includes layout works and plotting, material supply, manpower, framing system, machinery, tools, auxiliary means (scaffolding, etc) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 27 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

11.10.

False registered floor. The unit price includes plotting, supply, manpower, frame system, machinery, tools, auxiliary (scaffolding, etc.) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

11.11.

Wall and floor tile works. The unit price includes layout works and plotting, material supply, manpower, joints, sealing works, finishing, machinery, tools, auxiliary means (scaffolding, etc.) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings. Holes greater than 1 m2 shall be discounted from measurement.

11.12.

Downspout and sewage network. The unit price includes layout works and plotting, material supply, accessories, fastening elements, cuttings and cropping, manpower, surface preparation, machinery, tools, auxiliary means (scaffolding, etc) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the lineal meter to pipeline axes (lm), as specified on approved drawings.

11.13.

Roof gutters. The unit price includes layout works and plotting, special pieces, accessories, surface treatment (blasting + priming / hot dip galvanizing), finishing, installation, welding, fastening elements, overlaps, cuttings, forming and sealing joints, touch-up of paint, flashings and other elements, machinery, tools, auxiliary means (scaffolding, etc) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the lineal meter (lm), as specified on approved drawings.

11.14.

Metallic louver. The unit price includes layout works and plotting, special pieces, accessories, surface treatment (blasting + priming / hot dip galvanizing), finishing, installation, welding, frames, fastening elements, cuttings, forming and sealing joints, touch-up of paint, flashings and other elements, machinery, tools, auxiliary means (scaffolding, etc) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2), as specified on approved drawings.

11.15.

Pedestrian door. The unit price includes material supply, layout works and plotting, special pieces, execution of shop drawings, fastening and sealing material, frames,

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 28 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

jambs, special pieces, accessories, surface treatment (blasting + priming / hot dip galvanizing)and finishing, hinges, locks, louvers and glass works (according with specification and drawings, depending on the type of door). El price of installation includes the site unloading, intermediate transportation within the work site, layout works and plotting, installation, auxiliary means (scaffolding, etc.), machinery, tools, welding, sealing, touch-up of paint, special pieces, accessories, fastening and trimming elements. The unit of measure shall be the square meter (m2) of installed door, as specified on approved he drawings. 11.16.

Antipanic bar. The unit price includes the material supply (bar, lock, knob, etc.) layout work and plotting, installation, auxiliary means, tools and, in general, all required materials and labor for the correct completion of all work. The unit of measure shall be the unit (n) of panic lock bar installed, as specified on approved the drawings.

11.17.

Industrial doors (rolling, overhead, sliding). This unit price refers to a door of high dimension, used for the passing of merchandise, machinery, vehicles, etc. Usually industrial doors are rolling, overhead, sliding type and may have a pedestrian door embedded and may be manual and electrical. The unit price includes the material supply, plotting, execution of workshop drawings, fastening and sealing elements, frames, jambs, special pieces, accessories, surface treatment (blasting+ priming / hot dip galvanizing), finishing, hinges, locks, louver and glass works (according with specification and drawings, depending on the type of door), engine and connections, manual blocking system, bottom driving, guides and counterweight. The unit price includes site unloading, intermediate transportation inside work site, auxiliary means (scaffolding, etc), machinery, tools, welding, sealing, touch-up of paint, special pieces, accessories, auxiliary structure to the installation, fastening and trimming elements. The unit of measure shall be the square meter (m2) of installed industrial door, as specified in the approved drawings.

11.18.

Windows. The unit price includes the material supply, plotting, execution of workshop drawings, fastening and sealing elements, frames, jambs, special pieces, accessories, surface treatment (blasting+ priming / hot dip galvanizing), finishing, hinges, locks, louver and glass works (according with specification and drawings, depending on the type of door). The unit price includes site unloading, intermediate transportation inside work site, layout works, installation, auxiliary means (scaffolding, etc), machinery, tools, welding, sealing, touch-up of paint, special pieces, accessories, fastening and trimming elements.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 29 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

The unit of measure shall be the square meter (m2) of installed window, as specified in the approved drawings. 12. URBANIZATION. 12.1.

Gardening. The unit price includes layout works and plotting, manpower, excavation, backfilling, loading and transporting to an authorized dumping area, dumping fees, soil, fertilizer, grass, complete irrigation system from connection point (catch basin, piping, accessories, clocks, sprinklers, etc.) and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings. Only the gardening area will be measured, the area to the connection point is not measured (up to 25 m maximum).

12.2.

Vertical signposting. The unit price includes supply, excavation, backfilling, loading and transporting to an authorized dumping area, dumping fees, complete foundation, tools, auxiliary means, machinery and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the unity (n) of installed signposting as specified on approved drawings.

13. FENCING. 13.1.

Temporary fencing. The unit price includes material supply, installation, concrete footing, metal bands (clamps), accessories, tools, auxiliary means, machinery and, in general, all required material and labor for the correct completion of all work. The unit of measure is the lineal meter (lm) of installed fence as specified on approved drawings.

13.2.

Permanent fencing. The price includes material supply, excavation, backfilling and filling, concrete pouring, clamps, accessories, earthing, tools, auxiliary means, machinery and, in general, all required material and labor for the correct completion of all work.. The unit of measure is the lineal meter (lm) of installed fence, as specified on approved drawings.

13.3.

Access elements in fencing The price includes material supply, layout works and plotting, installation, lock, all hardware required for hanging, elements for opening (wheels, guides, rails, etc.) tools, auxiliary means, machinery and, in general all required material and labor for the correct completion of all work.. The unit of measure is the unity (n) or installed access elements, as specified on approved drawings.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 30 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

14. BUILDINGS AND INSTALLATIONS. 14.1.

Buildings. The unit price includes all the necessary civil works for the correct completion of all work for buildings. The sanitary installation, plumbing, finishing, steel structures, electricity, lighting, grounding and lightning, firefighting installation and telecom pre-installation are also include in the unit price. Telecom works (additional to above mentioned), HVAC, electrical and instrumental works for the equipment that will be installed inside the building and the transformer’s yard, shall not be included in the measurement and unit price. The unit of measure shall be the square meter (m2) of constructed building, as specified on approved drawings and taking the following additional points into consideration: -

The total measurement will be the sum of building of same category according to the Bill of Quantities. The building shall be measured as the vertical projection of each floor slab, considering the outer side of the facade. Holes greater than 2 m2 will be discounted, except for stairways. Steel structures (outers and inners) are not measured additionally, but shall be included in the unit price. 14.2.

Transformer Yards. The unit price includes all the necessary civil works for the correct completion of all work for transformer yards. The drainage installation, piping, oil pits, finishing, steel structures, sunshades, electricity, lighting, grounding and lightning, firefighting installation are also included in the unit price. Electrical, instrumental works for the equipment and Transformer Installation regarding the Transformer Yard shall not be included in unit prices. The unit of measure shall be the square meter (m2) of Transformer Yard, as specified on approved drawings and taking the following additional points into consideration: -

The total measurement will be the sum of all Transformer Yards. Holes greater than 2 m2 will be discounted, except for stairways. Steel structures (outers and inners) are not measured additionally, but shall be included in the unit price. The transformer’s yard shall be measured as the vertical projection of the area, from the fencing axes line to the outer façade of the building.

14.3.

Heat Ventilation and Air Conditioning (HVAC) system. The unit price includes all required materials and labor for the correct completion of all work (materials, equipment, electricity, instrumentation, electrical panels, draining, piping, supports, etc. of the HVAC system) and

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 31 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

ten (10) meters of general service wires and including all required testing, start-up activities and all required spare parts, manuals and quality dossiers. This unit of measure is the Lump Sum (LS) of installed HVAC system. 15. MISCELLANEOUS. 15.1.

Geotextiles. The unit price includes material supply, manpower, grip, overlaps, any additional widening, cuttings and cropping, tools, machinery, auxiliary means, and, in general, all required materials and labor for the correct completion of all work. The unit of measure is the square meter (m2) as specified on approved drawings.

16. OTHER TYPES OF WORK UNITS. For any type of work not previously listed in this document, criteria of the Contractor’s Site Manager shall apply.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 32 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

C. HOURLY RATES. 1.

General. The Subcontractor shall not begin any work using Hourly Rates without prior written approval by Contractor’s Site Manager. Any unauthorized or additional work performed without written approval shall not be measured nor paid. The Contractor’s Site Manager will expect on receiving a level of production officially recognized in each and every aspect of labor and machinery operation. Contractor will only accept for reviewing and signing, when applicable, those time sheets which have been turned in up to 24 hours following the completion of the work to which they apply. All charges for Hourly Rates shall be paid using the same payment conditions as other work units in the subcontract. Under no circumstances will special terms or conditions of payment be accepted. For the purpose of measurement and payment of Hourly Rates, the following conditions apply to the different hourly classifications:

2.

a.

Normal Hours: Refers to the first ten (10) hours of each workday, from (and including) Saturday, through (and including) Thursday.

b.

Overtime Hours: Refers to any additional hours completed during the abovementioned description.

c.

Holiday Hours: Refers to the twenty-four (24) hour period of Friday and official local holidays celebrated in the province where the project shall be completed.

Labor. These prices include all levels of supervision above the level of Foreman, tools, safety and security items, transportation to/from and within work site, wear and tear of tools and depreciation costs, standard consumables (welding materials, gases, etc.), travel, per-diem, general costs, profit, insurance, salaries, bonuses, social securities, taxes, and any other type of charge which can, for whatever reason, affect the cost of the item.

3.

Machinery. Prices refer only to production work hours. Any loss of time due to equipment breakdown, transit time for transportation from point of origin to work site, transport back to point of origin, or any other circumstances that may affect the work to be accomplished are not chargeable and will not be paid. Price includes: Transportation costs to/from and within work site, fuel, lubricants, maintenance, repair, wear and tear of machinery and depreciation costs, taxes, general costs, and the cost of any other equipment, tools or accessories which are

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 33 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

not specified in the Schedule of Rates but may be required for the completion of the work that has been requested. For mobile machinery and transportation vehicles, price includes driver, operator, as well as auxiliary personnel required for its operation. 4.

Material. Prices are for material delivered to the job site in the place specified by Contractor’s Site Manager, and include general costs, profit, insurance, bonuses, taxes, transportation to and within work site, safety and security items, and any other type of charge which can, for whatever reason, affect the cost of the item. For any other type of material received that has not been covered herein and is intended for use at the work site, payment will be as stipulated on the purchase invoice plus a 10% mark up for handling costs and profit, but must have been previously approved in writing by the Contractor’s Site Manager.

II.

RAPID PROJECT PACKAGE 3

PROJECT: 02260

TECHNICAL REQUISITION II-WORK UNITS, UNITS OF MEASUREMENT, AND APPLICABLE PRICES

PAGE 34 OF 34

DOCUMENT CODE: 022602520-CP/RAPID-P0003-TRSA-CVS-MRI-0001-2520

REV.: A

SCHEDULE OF RATES. The Subcontractor should complete, in it’s entirety, the following list of Unit Prices and Hourly Rates. Consideration should be given to definitions listed in specifications and Technical Requisitions, as well as the following: 1.

Unit Prices. Supply: Comprises all the costs associated with the supply and delivery of permanent materials (by work unit) to the work site. This includes general costs and profit. Erection: Comprises all costs of direct labor for a work unit. It includes unloading of material, intermediate transportation within work site, consumable material, temporary installations and facilities, all running costs, work costs, erection equipment costs (i.e. scaffolding, cranes, machinery, tools, etc.), indirect personnel, general costs and profit.

2.

Hourly Rates. It includes all costs applicable to each work unit, including indirect personnel, general costs and profit.

If the Subcontractor wishes to provide to any amplifying information to this price list it should be submitted in a separate sheet attached to this document. Prices will be entered using two position decimal points (hundredths) only. All other decimal values will be rounded up to the nearest hundredth.

Related Documents

Air Cooler Maintenance
January 2021 0
Cooler
January 2021 4
Cooler Control.ppt
January 2021 4
Chap 008
March 2021 0

More Documents from "jjseven22"