DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210

6

29.Mai.2008

BARRO ALTO PROJECT – IMPLEMENTATION PHASE PROJECT PROCEDURES

AREA BREAKDOWN EQUIPMENT IDENTIFICATION PROCESS FLOW DIAGRAMS PIPING AND INSTRUMENT DIAGRAMS DISTRIBUTION Name

Code

Name

Ap

J E Silva

Cm

C Carneiro

Cm

J C Queiroz

Cm

V Fortes

Cm

Ac

For Action

Ap

For Approval

Co

For Co-ordination

D

For Design

I

Code

E Piantino

Name

Cm

For Information

DOCUMENT CONTROL Rev no. 0

26 Jan 2007

1

27.Mar.2007

2

Date

REMARKS

Code

For Comments

E

For Enquiry

F

For Filing

X

Cancelled

Doc. no.

Prep.

Issued

Check

Approved

For Information

JCQ

JCQ

EJP

MAF

Included Area Code

JCQ

JCQ

EJP

MAF

10.Apr.2007

General Revision

JCQ

JCQ

EJP

MAF

3

14. May.2007

General Revision

JCQ

JCQ

EJP

MAF

4

23. Oct.2007

General Revision

JCQ

JCQ

EJP

MAF

5

26. Apr 2008

General Revision

FAO

FAO

JQC

EJP

6

29. Mai 2008

General Revision

FAO

FAO

JQC

EJP

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 1

DOCUMENT NUMBER

PBA-P-000-000-PD-210 1.0

5

REVISION DATE 6

29.Mai.2008

BACKGROUND

Area breakdown and procedures for the identification of equipment are fundamental requirements for the preparation of PFD’s, C&ID’s, Single line Diagrams and P&ID’s. Anglo Base Metals (ABM) has defined specific policies for asset management and optimisation of the operations, which require these procedures and structures to be in line and compatible with the software currently used by ABM (Ellipse). These structures and procedures may also be used for the development of the cost structure and schedule for the project. 2.0

OBJECTIVES

This document defines the relevant criteria and procedures to be applied in the process engineering activities during the feasibility study. As the study progress it is likely that this document will be modified to accommodate the up-dates and the contributions from the engineering contractor.

5

3.0

STRUCTURE

This document is structured as follows: Area Break Down Identification of Equipment and Components Identification of Piping Material Codes Mechanical Equipment Code (Mine) Mechanical Equipment Code (Smelter) General Electrical Equipment Code Instrumentation and Control Code Maintenance Code Materials of construction Code Fluids Code

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 2

DOCUMENT NUMBER

PBA-P-000-000-PD-210

REVISION DATE 6

29.Mai.2008

Area Breakdown The project is divided into physical areas according to the following structure, which is based on the following criteria: 1. The breakdown is primarily based on the concept of “physical area”, as universally accepted 2. For these cases with parallel lines, the above concept may be superseded by the “line concept”, which is a Ellipse requirement as to properly account for individual cost for a given line 3. The breakdown includes three levels in order to accommodate the comments from SL-Miner 4. Exceptions are applicable to the Mine, where functional criteria replaces the physical area concept 5. Other exceptions have been introduced as to facilitate the common use of the area breakdown structure in the work breakdown structure (WBS) AREA 000

DESCRIPTION GENERAL 010

020

Camp Contractors 011

Camp Contractors

012

Contractors Provisory Installation

Harmonic Filter, Thyristors and Main Generator Station 021

030

022

Control Room and Thyristors Station Main Generator Station

024

Kilns and Dryers Generator Station

Vehicles 031

Vehicles – Administration Area

032

Vehicles – Maintenance Area

033

Vehicles – Operational Area

040

Freight

050

TBA

060

Harmonic Filters Station

023

041

Freight

Waste recycling storage 061

Waste recycling storage

070

Land Acquisition

080

TBA

071 090

Rev.04

Land Acquisition

Multiple Application Packages 091

100

COMMENTS

Multiple Application Packages

INFRASTRUCTURE 110

Water Supply and Distribution 111

Water Pumping Station – Dos Patos River

112

Raw Water Pipeline

113

TBA

114

Water Treatment Plant

115

Process Water Storage and Distribution

116

Water Cooling System

117

Potable Water Storage and Distribution

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 3

DOCUMENT NUMBER

PBA-P-000-000-PD-210 AREA

DATE 6

DESCRIPTION

120

118

Fire Water Circuit Storage and Distribution

119

Recirculation Water Reservoir

130

140

150

Landscaping / Earthmoving Industrial area 131

Landscaping / Fencing

132

Earthmoving

133

Paving / Traffic signals

141

Main Access Road and Trucks Parking Area

Rev.2

142

Farm Access Road

Rev.2

143

TBA

Rev.2

144

Water Service Roads

Pipe racks Pipe racks

Pluvial Drainage Industrial Area

190

Rev.2

Pluvial Drainage

IT Telecommunication System 171

180

Rev.2

Roads

161 170

COMMENTS

Sewage System and Treatment Plant

151 160

29.Mai.2008

Sewage System and Treatment Plant 121

200

REVISION

IT Telecommunication System

Electrical Power 181

Main Power Line – 230 kV

182

Main Sub-station

183

Power Line Distribution 13,8 kV

184

Dos Patos substation / MCC Area

185

Recirculation water dam substation/ MCC Area

186

Furnas-Itapaci 230KV Transmission Line Relocation

187

Water Cooling system Substation /MCC Area

188

Water treatment-Fire water circuit /MCC Area

189

Generator Station – Stand-by

Rev.5

Area PLC 191

PLC – Patos River Area

192

PLC - Water Treatment/Fire water Circuit

193

PLC – Water cooling Area

194

PLC – Recirculation Water Dam Area

195

PLC – General service

196

PLC- Generator Station Area

Rev.2

MINE 210

Geology 211

220

Geology Office (Software)

212

Field Equipment

213

Site services

Rev.4

Mine Roads 221

Secondary Mine Roads

222

Main Mine Access Road

Rev.2

223

Up-Grading / ROM Receiving Access Road

Rev.2

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 4

DOCUMENT NUMBER

PBA-P-000-000-PD-210 AREA

DATE 6

DESCRIPTION 230

240

250

270

280

232

Transportation Equipment Auxiliary services Equipment

ROM Blending 241

ROM Blending Stockpiles

242

Stockpiles Reclamation Equipment

243

ROM Transportation Equipment

244

Up-grading Plant

245

Unit Substation - Up-grading Plant

General Mine Office (Software)

252

Mine Lighting

253

Mine Dispatch system

Mine Dewatering 261

Mine Surface Drainage

262

Mine Infrastructure

263

Mine Pumping Stations

Explosives 271

Blasting Accessories Store

272

Explosives Magazine

Mine Stripping 281

290

COMMENTS

Mining and Loading Equipment

233

251

260

29.Mai.2008

Mining Equipment 231

Mine Stripping

Area PLC 291

300

REVISION

PLC – Up-Grading Plant

ORE PREPARATION PLANT 310

320

ROM Receiving Plant 311

ROM Intermediate Storage

312

ROM Tipping

Crushing Plant 321

330

322

Kiln Dust Addition Circuit

323

TBA

324

Belt Washing Slurry Treatment

325

Dust Emission Control Circuit

326

Kiln Dust Handling Circuit

Optical Sorting 331

340

350

Crushing Circuit

Optical Sorting (Future)

Ore Homogenisation Circuit 341

Stacking Circuit and Homogenised Stockpiles

342

Reclamation circuit

343

Crushed Ore Sampling Plant

344

Dust Emission Control Circuit

Drying Plant G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 5

DOCUMENT NUMBER

PBA-P-000-000-PD-210 AREA

DATE 6

DESCRIPTION

380

390

400

REVISION

351

Dryer – Line I

352

Dryer – Line II

353

Top Size Control

354

Dry Ore Storage and Reclamation

355

Ore fines agglomeration

356

Ore sampling plant

29.Mai.2008

COMMENTS

Unit Substation 381

Unit Substation Crushing/Stacker Area

382

Unit substation Dryers /Top Size control/Recl.

383

TBA

384

TBA

385

TBA

386

Area MCC Crushing Area

387

Area MCC- Dryer Line I Area

388

Area MCC- Dryer Line II Area

389

Area MCC – Top size control

Area PLC 391

PLC - Crushing Area

392

PLC - Dryer I Area

393

PLC - Dryer II Area

394

PLC – Top size control Area

395

PLC – Stacker and Reclaimer

Rev.2

CALCINING 410

420 430

440

480

Rotary Kiln 411

Rotary Kiln - Line I

412

Rotary Kiln- Line II

Cold Calcine Storage

Area Cancelled

421

Area Cancelled

Pelletising Plant 431

Dust Storage and Distribution

432

Disk Pelletisers

433

Pellets storage and handling

434

Pellets Drying

Rev.3

KILN Off-Gas Plant 441

Off-Gas Treatment Circuit – Line I

Rev.3

442

Off-Gas Treatment Circuit – Line II

Rev.3

Unit Substation 481

490

Cold Calcine Storage and Reclamation

Unit Substation Kiln – Line I

482

Unit Substation Kiln – Line II

483

Area MCC Kiln – Line I

484

Area MCC Kiln – Line II

Area PLC 491

PLC Kiln - Line I Area

492

PLC Kiln – Line II Area

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 6

DOCUMENT NUMBER

PBA-P-000-000-PD-210 AREA

DESCRIPTION 493

500

REVISION DATE 6

29.Mai.2008

COMMENTS

PLC – General service Area

ELECTRIC FURNACES 510

520

530

540

550

560

Electric Furnace 511

Electric Furnace – Line I

512

Electric Furnace – Line II

Calcine Transfer System 521

Calcine transfer Circuit – Line I

522

Calcine Transfer Circuit – Line II

523

Calcine transfer Circuit – Stand-by

Slag Granulation and Handling 531

Slag Granulation and Handling – Line I

532

Slag Granulation and Handling – Line II

533

EF’s Slag Disposal Area

Electric furnace Off-gas Plant 541

Electric furnace Off-gas – Line I

542

Electric furnace Off-gas – Line II

543

Dust Emission Control System – Line I

Rev.5

544

Dust Emission Control System – Line II

Rev.5

Central Control Room 551

Control Room

552

Softwares

Waste Heat Recovery Plant 561

580

590

600

Waste Heat Recovery Plant

Unit Substation 581

Unit Substation EF – Line I

582

Unit Substation EF – Line II

583

Area MCC EF – Line I

584

Area MCC EF – Line II

585

Unit Substation Slag dumping

586

Area MCC – Slag dumping

Area PLC 591

PLC – EF Line I Area

592

PLC – EF Line II Area

593

PLC – General service

REFINERY 610

620

Ladle Furnace 611

Ladle furnace - Line I

612

Ladle Furnace – Line II

Metal granulation 621

630

Metal Granulation Plant

Slag Treatment

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 7

DOCUMENT NUMBER

PBA-P-000-000-PD-210 AREA

DESCRIPTION

640 650

680

690

631

Slag Treatment Circuit

632

Refinery Tailings Pond

6

29.Mai.2008

COMMENTS

Rev.3 Rev.1

641

Rev.1

Refinery - General

Refinery control room 651

Refinery control room

652

Software

Unit Substation 681

LD Line I – Unit substation

682

LD Line II – Unit Substation

683

LD Line I – Area MCC

684

LD line II - Area MCC

Area PLC PLC – LD Line I Area

692

PLC – LD Line II Area

693

PLC – LD General Service

Rev.2

REAGENTS AND CONSUMABLES 710

720

Fuel – Storage and Distribution 711

Heavy Fuel Oil – Storage and Distribution

712

Diesel – Storage and Distribution

Soederberg Paste Storage 721

Soederberg paste storage

730

Reductant

740

Reagents Store

731 741 750

760

770 780

790

Coal Preparation and Storage Reagents Store

Gases – Storage and distribution 751

Oxygen

752

Nitrogen

753

LPG

Compressed Air 761

Compressed Air Circuit

762

TBA

Pulverized Coal Plant 771

800

DATE

Refinery - General

691

700

REVISION

Pulverized Coal Plant

Unit Substation 781

Unit Substation Reagents and Cons. Area

782

Area MCC

Area PLC 791

PLC – Reagents and Consumables Area

792

PLC – Pulverised Coal Area

Rev.2 Rev.2

793

PLC – General Service Area

Rev.2

AUXILIARY BUILDINGS AND FACILITIES G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 8

DOCUMENT NUMBER

PBA-P-000-000-PD-210 AREA

REVISION DATE 6

DESCRIPTION 810

820

29.Mai.2008

COMMENTS

Offices 811

Main Office

812

Change House

813

Canteen

814

First Aid/SHE/Quality

815

Training Centre

816

Mine and Geology Office

817

Bank

818

Reception

819

Contractors Support Facilities

Laboratory 821

Main Laboratory

822

Geology Laboratory

823 824 830

831

840

850

860

870

832

Earthmoving Vehicles Wash and Lub Bay

834

Effluent treatment Plant

Main Stores 841

Main Store

842

Refuelling Station

Storage, Handling and Dispatch 851

Storage

852

Packaging and Dispatch

Main Gate 861

Main Gate

862

Secondary gate

863

Road scale

Production Office

Offices Unit substation

882

Workshop Unit substation

883

Offices – MCC Area

884

Workshop – MCC Area

Area PLC 891

900

Production Office

Unit Substation 881

890

Workshop Mechanical /Electrical /Instrument.

833

871 880

Effluent Neutralisation Plant

Workshops

PLC - Storage, Handling and Dispatch

Rev.2

INDIRECTS 910

920

Project Management 911

Owner’s Cost

912

EPCM

Pre Production & First Fill G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 9

DOCUMENT NUMBER

PBA-P-000-000-PD-210 AREA

DESCRIPTION

930

940

921

Pre Production & Stripping

922

First Fill

931

Property and Mineral rights

932

Collective Agreement

29.Mai.2008

COMMENTS

Contingency

Project Financing Project Financing

SHE-SD 961

970

6

Contingency

951 960

DATE

Legal

941 950

REVISION

SHE-SD

Spare-Parts 971

Spare Parts

980

Erection Supervision

990

Others Indirects Costs

981 991

Erection Supervision Others indirects Costs

992

Insurance

993

Escalation

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 10

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 3.1

6

29.Mai.2008

Identification of equipments and components for PFD

This structure is made of 9 positions and it is applicable for mechanical equipments in the PFD files. EQUIPMENT IDENTIFICATION AREA

EQUIP

SEQUENCE 1

-

-

SUF

-

The identification of the equipment, its components and peripheral items will be made according to the following criteria: The above fields will be filled in as follows: AREA

– according to the Area Breakdown – item 3.1

EQUIP

– according to the following codes: Mechanical Equipment Code (Smelter) – item 3.7

SEQUENCE

– sequential numbering within a given area and a given type of equipment

SUF

– suffix “A” is applied for the main unit and “R” is applied to the spare unit

EXAMPLES OF APPLICATION Example 1 – The second conveyor belt in the Primary Crushing 3

2

1

-

T

C

-

0

0

2

-

Example 2 – The first rotary valve in the Primary Crushing 3

2

1

-

V

R

-

0

0

1

-

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 11

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 3.2

6

29.Mai.2008

Identification of equipments and components for P&ID or C&ID

This structure is made of 17 positions and it is applicable for mechanical and electrical equipment in the P&ID or C&ID files. EQUIPMENT IDENTIFICATION AREA

EQUIP

SEQUENCE 1

-

COMPONENT

SUF

-

-

SEQUENCE 2

-

-

The identification of the equipment, its components and peripheral items will be made according to the following criteria: The above fields will be filled in as follows: AREA

– according to the Area Breakdown – item 3.1

EQUIP

– according to the following codes: Mechanical Equipment Code (Smelter) – item 3.7 Electrical Equipment Code – item 3.8 (Just to identify equipments or components belongs to automation area, like control panels, local panels, plc’s,remote I/O’s and etc)

SEQUENCE 1

– sequential numbering within a given area and a given type of equipment

SUF

– suffix “A” is applied for the main unit and “R” is applied to the spare unit

COMPONENT

– according to the following codes (just to Mechanical Equipments): Instrumentation and Control Code – ISA – item 3.5 (Following the ISA code even the code is not included in the table)

SEQUENCE 2

– sequential numbering within the given complement

Notes: • All manual valves installed on pipelines or process intake (pressure gauges block valves, pressure switch block valves and etc) will not be tagged at P&ID. • Manual or automatic valves installed on the silos discharge and ducts shall be considered as mechanical equipments, and will be tagged according examples number 6. • Automatic valves that don’t fill the above requirements, i.e instrumentation valves such as shut-off valves, control valves, pilot valves and inline solenoid valves, should be tagged according examples number 4. EXAMPLES OF APPLICATION Example 1 – The level switch high installed on the second conveyor belt in the Primary Crushing 3

2

1

-

T

C

-

0

0

2

-

-

L

S

H

-

0

0

1

-

0

0

1

-

0

0

1

Example 2 – The emergency switch of the second conveyor belt in the Primary Crushing 3

2

1

-

T

C

-

0

0

2

-

-

H

S

S

Example 3 – Differential pressure alarm high high of the filter in the Electrical Furnace 5

1

1

-

F

L

-

0

0

1

-

-

P

D

A

H

H

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 12

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210

6

29.Mai.2008

Example 4 – Flow Control Valve in the Cooling Water Circuit of Electrical Furnace 5

1

1

-

S

L

-

0

0

1

-

-

F

V

-

0

0

1

-

0

0

1

-

0

0

1

-

0

0

1

Example 5 – Flow Control Valve open limit switch related to the valve of example 4 5

1

1

-

S

L

-

0

0

1

-

-

Z

S

H

Example 6 – Guillotine valve in the Primary Crushing Silo Discharge 3

2

1

-

V

F

-

0

0

1

-

-

-

Example 7 – Open limit switch related to the valve of example 6 3

2

1

-

V

F

-

0

0

1

-

-

Z

S

H

Example 8 – Control panel number one from Ladle Furnace 1 that interfaces with DCS 6

1

1

-

F

P

-

0

0

1

-

-

P

C

Example 9 – HMI panel from Ladle Furnace 1 that belongs to DCS 6

9

1

-

L

O

-

0

0

1

-

-

-

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 13

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 3.3

6

29.Mai.2008

Identification of Single Line Diagram

This structure is made of 9 positions and it is applicable for electrical equipments in the Single Line Diagram files. EQUIPMENT IDENTIFICATION AREA

EQUIP

SEQUENCE 1

-

-

EQUIP 2

SUF

-

-

SEQUENCE 2

-

The identification of the equipment, its components and peripheral items will be made according to the following criteria: The above fields will be filled in as follows: AREA

– according to the Area Breakdown – item 3.1

EQUIP

– according to the following codes: Mechanical Equipment Code (Smelter) – item 3.7 Electrical Equipment Code – item 3.8

SEQUENCE

– sequential numbering within a given area and a given type of equipment

EQUIP 2

– according to the following codes: Electrical Equipment Code – item 3.8

SEQUENCE 2

– sequential numbering within a given area and a given type of equipment

EXAMPLES OF APPLICATION Example 1 – The first transformer from the Dryer fan #3 3

5

1

-

V

E

-

0

0

3

-

-

T

F

-

0

0

1

Example 2 – The first circuit breaker on the Kiln Electrical Room 4

8

1

-

D

J

-

0

0

1

-

-

-

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 14

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210

3.4

6

29.Mai.2008

Identification of Pipelines

The identification of the pipelines in the P&ID’s follows similar procedure as for the equipment items. This identification will be compulsorily associated with the isometrics prepared for each line. PIPELINE IDENTIFICATION AREA

DIAMETER

FLUID

-

MATERIAL

-

SEQUENCE

-

-

The above fields will be filled in as follows: AREA

– according to the Area Breakdown – item 3.1

DIAMETER

– nominal diameter (mm)

FLUID

– fluid inside the pipe according to Fluids Code – item 3.10

MATERIAL

– material of the pipe according to Piping Material Code – item 3.11

SEQUENCE

– sequential numbering within a given area

EXAMPLES OF APPLICATION Example 1 – Line of the raw water pump, with 800 mm, made of carbon steel and flanged: 1

1

1

-

8

0

0

-

A

B

-

A

C

-

0

3

2

Example 2 – Compressed air low pressure line of the Kiln area, mild steel, size 50 mm diameter: 4

3

0

-

5

0

-

L

A

-

A

C

-

0

0

8

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 15

DOCUMENT NUMBER

REVISION

PBA-P-000-000-PD-210 3.5 3.5.1

DATE 6

29.Mai.2008

Instrumentation and Control Code Instrumentation and Control Code (Instruments and Functions) CODE

A

A

H

A

A

H

A

A

L

A

A

L

A

E

DESCRICAO

H L

DESCRIPTION

Alarme - análise/concentração alta

Analyzer alarm high

Alarme - análise/concentração muito alta

Analyzer alarm high high

Alarme - análise/concentração baixa

Analyzer alarm low

Alarme - análise/concentração muito baixa

Analyzer alarm low low

Elemento sensor do analisador

Analyzer element sensor

A

I

S

Análise - chave e indicador

Analyzer indication switch

A

I

T

Transmissor e indicador de analise

Analyzer indication transmitter

B

A

L

Alarme de falta de chama

Burner alarm low (non flame)

B

S

Detector de chama

Burner switch

D

A

H

D

A

H

D

A

L

D

A

L

Alarme - densidade alta

Density alarm high

H

Alarme - densidade muito alta

Density alarm high high

Alarme - densidade baixa

Density alarm low

L

Alarme - densidade muito baixa

Density alarm low low

D

E

Elemento sensor de densidade

Density sensor

D

I

C

Indicação e controle de densidade

Density indication controller

D

I

T

Transmissor e indicador de densidade

Density indication transmitter

Valvula de controle de densidade

Density control valve

Alarme - tensão alta

Voltage alarm high

D

V

E

A

H

E

A

H

E

A

L

E

A

L

E

I

C

E

I

T

E

I

F

A

H

F

A

H

F

A

L

F

A

L

H L

Alarme - tensão muito alta

Voltage alarm high high

Alarme - tensão baixa

Voltage alarm low

Alarme - tensão muito baixa

Voltage alarm low low

Indicação e controle de tensão

Voltage indication controller

Transmissor e indicação de tensão

Voltage indication transmitter

Indicação de tensão

Voltage indication

Alarme de vazão alta

Flow alarm high

H

Alarme de vazão muito alta

Flow alarm high high

Alarme de vazão baixa

Flow alarm low

L

Alarme de vazão muito baixa

Flow alarm low low

F

E

Elemento sensor de vazão

Flow sensor

F

F

Y

Computador de relação de vazão

Flow ratio computer

F

I

C

Controlador e indicador de vazão

Flow indication controller

F

I

T

F

I

Transmissor e indicador de vazão

Flow indication transmitter

Indicador de vazão

Flow Indicator

F

S

H

Chave de vazão alta

Flow switch high

F

S

L

Chave de vazão baixa

Flow switch low

F

V

Valvula de controle de vazão

Flow control valve

H

I

Estação manual de controle

Hand indication controller

C

H

S

A

Alarme de chave de emergencia

Pull cord emergency alarm

H

S

S

Chave de emergencia

Pull cord emergency switch

H

S

Chave Seletora manual

Hand switch

I

A

Alarme de corrente alta

Current alarm high

H

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 16

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 CODE

I

A

H

I

A

L

DESCRICAO

H

6

29.Mai.2008

DESCRIPTION

Alarme de corrente muito alta

Current alarm high high

Alarme de corrente baixa

Current alarm low

I

A

L

Alarme de corrente muito baixa

Current alarm low low

I

I

C

Indicação e controle de corrente

Current indication controller

I

I

T

Transmissor e indicador de corrente

Current indication transmitter

L

I

I

Indicador de corrente

Current indication

K

C

Programador sequenciador de tempo

Time schedule controller

L

A

H

L

A

H

L

A

L

L

A

L

L

E

L

I

C T

Alarme de nivel alto

Level alarm high

H

Alarme de nivel muito alto

Level alarm high high

Alarme de nivel baixo

Level alarm low

L

Alarme de nivel muito baixo

Level alarm low low

Sensor de nivel

Level sensor

Controlador e indicador de nivel

Level indication controller

Transmissor e indicador de nivel

Level indication transmitter

Indicador de nivel

Level indication

Chave de nivel alto

Level switch high

L

I

L

I

L

S

H

L

S

H

H

Chave de nivel muito alto

Level switch high high

L

S

L

H

Chave de Nivel (Alto e Baixo)

Level Switch (High and Low)

Chave de nivel baixo

Level switch low

L

Chave de nivel muito baixo

Level switch low low

L

S

L

L

S

L

L

V

Valvula de controle de nível

Level control valve

L

X

Fonte radioativa para nivel

Level radioactive source

Alarme de umidade alta

Moisture alarm high

Alarme de umidade muito alta

Moisture alarm high high

Alarme de umidade baixa

Moisture alarm low

Alarme de umidade muito baixa

Moisture alarm low low

Sensor de umidade

Moisture sensor

C

Controlador e indicador de umidade

Moisture indication controller

T

Transmissor e indicador de umidade

Moisture indication transmitter

M

A

H

M

A

H

M

A

L

M

A

L

M

E

M

I

M

I

H L

M

I

Indicador de umidade

Moisture indication

M

X

Fonte radioativa para umidade

Moisture radioactive source

N

S

H

Chave de Torque Alto (Direita)

Torque Switch High (Right)

N

S

L

Chave de Torque Baixo (Esquerda)

Torque Switch Low (Left)

P

A

H

Alarme de pressão alta

Pressure alarm high

P

A

H

Alarme de pressão muita alta

Pressure alarm high high

Alarme de pressão baixa

Pressure alarm low

P

A

L

P

A

L

P

C

H L

P

D

A

H

P

D

A

H

P

D

A

L

P

D

A

L

P

D

I

Alarme de pressão muito baixa

Pressure alarm low low

Controle de Pressão

Pressure Control

Alarme de pressão diferencial alta

Differencial pressure alarm high

H

Alarme de pressão diferencial muito alta

Differencial pressure alarm high high

Alarme de pressão diferencial baixa

Differencial pressure alarm low

L

Alarme de pressão diferencial muito baixa

Differencial pressure alarm low low

Indicador de pressão diferencial

Differencial pressure indication

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 17

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 CODE

DESCRICAO

6

29.Mai.2008

DESCRIPTION

P

D

I

C

Controlador e indicador de pressão diferencial

Differencial pressure indication controller

P

D

S

H

Chave de pressão diferencial alta

Differencial pressure switch high

Chave de pressão diferencial muito alta

Differencial pressure switch high high Differencial pressure switch low

Chave de pressão diferencial muito baixa

Differencial pressure switch low low

D

S

H

D

S

L

P

D

S

L

P

D

T

Transmissor de pressão diferencial

Differencial pressure transmitter

P

I

C

Controlador e indicador de pressão

Pressure indication controller

T

P

I

P

I

P

S

H

P

S

H

P

S

L

P

S

L V

P

S

P

V

Q

I

H

Chave de pressão diferencial baixa

P P

L

Transmissor e indicador de pressão

Pressure indication transmitter

Indicador de pressão (Manômetro)

Pressure indication

Chave de pressão alta

Pressure switch high

H

Chave de pressão muito alta

Pressure switch high high

Chave de pressão baixa

Pressure switch low

L

Chave de pressão muito baixa

Pressure switch low low

T

Valvula de segurança e alivio

Pressure safety valve

Valvula de controle de pressão

Pressure control valve

Transmissor e Indicação de quantidade

Quantity Indicator Transmiter

Alarme de velocidade alta

Speed alarm high

Alarme de velocidade muito alta

Speed alarm high high

Alarme de velocidade baixa

Speed alarm low

Alarme de velocidade muito baixa

Speed alarm low low

Sensor de velocidade

Speed sensor

Controlador e indicador e de velocidade

Speed indication controller

S

A

H

S

A

H

S

A

L

S

A

L

S

E

S

I

C

S

I

R

Registrador e indicador de velocidade

Speed indication recording

S

I

T

Transmissor e indicador de velocidade

Speed indication transmitter

Transmissor de velocidade

Speed transmitter

Alarme de temperatura alta

Temperature alarm high

H

Alarme de temperatura muito alta

Temperature alarm high high

Alarme de temperatura baixa

Temperature alarm low

L

Alarme de temperatura muito baixa

Temperature alarm low low

Elemento sensor de temperatura

Temperature sensor

Controlador e indicador de temperatura

Temperature indication controller

S

T

T

A

H

T

A

H

T

A

L

T

A

L

T

E

T

I

C T

T

I

T

I

T

S

H

T

S

H

H L

H

Transmissor e indicador de temperatura

Temperature indication transmitter

Indicador de temperatura

Temperature indication

Chave de temperatura alta

Temperature switch high

Chave de temperatura muito alta

Temperature switch high high

Chave de temperatura baixa

Temperature switch low

T

S

L

T

S

L

L

Chave de temperatura muito baixa

Temperature switch low low

T

S

L

H

Chave de Temperatura (Alto e Baixo)

Temperature Switch (High and Low)

T

V

Valvula de controle de temperatura

Temperature control valve

T

W

Poço de proteção

Temperature well

U

A

Alarme sonoro

Multivariable alarm (sounding alarm)

U

T

Camera de video

Multivariable transmitter (video camera)

U

Y

Relé multi-função / multivariável

Multivariable or multifunction relay

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 18

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 CODE

DESCRICAO

6

DESCRIPTION

Alarme de vibração alta

Vibration alarm high

Alarme de vibração muito alta

Vibration alarm high high

C

Controlador e indicador de vibração

Vibration indication controller

V

A

H

V

A

H

V

I

H

29.Mai.2008

V

I

T

Transmissor e indicador de vibração

Vibration indication transmiter

V

S

H

Chave de vibração alta

Vibration switch high

V

S

H

Chave de vibração muito alta

Vibration switch high high

W

A

H

W

A

H

W

A

L

W

A

L

W

E

H H L

Alarme de peso alto

Weight alarm high

Alarme de peso muito alto

Weight alarm high high

Alarme de peso baixo

Weight alarm low

Alarme de peso muito baixo

Weight alarm low low

Celula de carga

Load cell

W

F

Y

Computador de relação de peso

Weight ratio computer

W

I

C

Controlador e indicador de peso

Weight indication controller

W

I

T

Transmissor e indicador de peso

Weight indication transmiter

Indicador de peso

Weight indication

Totalizador de peso

Weight totalizer indication

W

I

W

Q

I

W

Q

S

Chave de totalização de peso

Weight totalizer switch

X

A

Alarme de equipamento com defeito

Malfunction alarm

X

C

Sinalização de estado de equipamento

Equipment state

X

L

Sinalização de equipamento funcionando

Motor running signalling

X

S

Detector de rasgo

Belt rip cord switch

X

V

Válvula de bloqueio

Block control valve

Y

A

Alarme de metal detectado

Metal detector alarm

Y

E

Sensor de detecção de melal

Metal detector sensor

Chave de detecção de metal

Metal detector switch

Alarme de fim de curso (direita/aberta)

Final position alarm

Alarme de sobrecurso (direita/aberta)

Over limit positon alarm

Alarme de fim de curso (esquerda/fechada)

Final position alarm

Alarme de sobrecurso (esquerda/fechada)

Over limit positon alarm

Y

S

Z

A

H

Z

A

H

Z

A

L

Z

A

L

Z

A

M

Alarme de posição intermediaria

Intermediate position alarm

Z

I

C

Controlador e indicador de posição

Position indication controller

Z

I

T

Transmissor e indicação de posição

Position indication transmitter

Indicador de posição

Position indication

Chave fim de curso (direita/aberta)

Final position switch

Chave sobrecurso (direita/aberta)

Over limit positon switch

Z

I

Z

S

H

Z

S

H

H L

H

Z

S

H

Chave fim de curso Alta (Aberta)

Limit Switch High (Opened)

Z

S

L

Chave fim de curso (esquerda/fechada)

Final position switch

Z

S

L

Chave sobrecurso (esquerda/fechada)

Over limit position switch

Z

S

L

Chave fim de curso Baixa (Fechada)

Limit Switch Low (Closed)

Z

S

M

Chave de posição intermediaria

Intermediate position switch

L

Z

S

Chave de detecção tensionamento correia

Belt tension sensor

Z

T

Transmissor de posição

Position transmitter

Z

X

A

Alarme de desalinhamento

Misalignment alarm

Z

X

S

Chave de desalinhamento

Misalignment switch

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 19

DOCUMENT NUMBER

PBA-P-000-000-PD-210 3.5.2

REVISION DATE 6

29.Mai.2008

Instrumentation and Control Code (Local control panel) CODE

DESCRIÇÃO

DESCRIPTION

B

L

A

L

Botão liga abaixa/diminui local

Local push-button - start turn down/decrease

B

L

I

L

Botão liga local

Local push-button - start

B

L

F

L

Botão liga local - frente

Local push-button - start forward

B

L

R

L

Botão liga local - ré

Local push-button - start reverse

B

L

S

L

Botão liga sobe/aumenta local

Local push-button - start turn up/increase

B

D

L

L

Botão desliga local

Local push-button - stop

B

E

M

L

Botão desliga local - emergência

Local push-button - emergency stop

B

L

O

L

Botão abre local

Local push-button - open

B

L

C

L

Botão fecha local

Local push-button - close

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 20

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 3.5.3

6

29.Mai.2008

Instrumentation and Control Code (Smart frequency converter) CODE

DESCRICAO

DESCRIPTION

I

L

Botão liga local

Local push-button - start

L

F

L

Botão liga local - frente

Local push-button - start forward

L

R

L

Botão liga local - ré

Local push-button - start reverse

B

D

L

L

Botão desliga local

Local push-button - stop

B

E

M

L

Botão desliga local - emergência

Local push-button - emergency stop

T

B

L

B B

I

I

Monitoração de corrente

Current measurement

X

A

Alarme de equipamento com defeito

Malfunction alarm

S

T

Transmissor de velocidade

Speed transmitter

S

Z

Variador de velocidade

Speed controller

X

Y

Intertravamento

Voltage indication controller

K

X

Intertravado

Interlocked

X

C

Estado

State

Y

C

Comando

Control

Y

C

0

1

Comando ajustar modo remoto

Remote mode set

Y

C

0

2

Comando ajustar modo manutenção

Maintenance mode set

Y

C

0

3

Comando reset geral

General reset command

Y

C

0

4

Comando Partir frente

Run foward command

Y

C

0

5

Comando Partir ré

Run reverse command

X

C

0

1

Operando modo remoto

Remote mode status

X

C

0

2

Operando modo manutanção

Maintenance mode status

X

C

0

3

Pronto para partir

Ready to start

X

C

0

4

Partindo

Starting

X

C

0

5

Frente funcionando

Running foward

X

C

0

6

Ré funcionando

Running reverse

X

C

0

7

Condição geral de falha

General faul condition

X

C

0

8

Parada pelo campo

Field stop status

X

C

0

9

Estado circuito de freios

Main & auxiliary circuit breaker status

X

C

1

0

Emergencia acionada(so para correias)

Pull rope status (conveyors only)

X

A

0

1

Subtensão

Supply under voltage fault

X

A

0

2

Sobretensão

Supply over voltage fault

X

A

0

3

Curto-circuito

Load short circuit

X

A

0

4

Circuito aberto

Load open circuit

X

A

0

5

Sobrecarga

Overcurrent

X

A

0

6

Falha aterramento

Earth Fault

X

A

0

7

Perda de fase

Phase Losee

X

A

0

8

Motor parado por excesso de carga

Motor shall

X

A

0

9

Sobretemperatura do VSD

VSD Overtemperature

X

A

1

0

Sobretemperatura do motor

Motor Overtemperature

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 21

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 CODE

6

DESCRICAO

29.Mai.2008

DESCRIPTION

S

C

Setpoint de velocidade

S

I

Velocidade atual

Actual speed

I

I

Corrente atual

Actual current

K

Q

Horas funcionando

Total running hours

J

I

Potência atual

Actual power - kW

N

I

Torque atual

Actual torque Total kWh

I

Speed Setpoint

J

Q

I

Consumo total

J

F

I

Fator de potência

Power factor

T

I

Temperatura do motor

Motor temperature-Large motors>220kW

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 22

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 3.5.4

6

29.Mai.2008

Instrumentation and Control Code (Smart relay – Simocode) CODE

DESCRICAO

DESCRIPTION

B

L

I

L

Botão liga local

Local push-button - start

B

L

F

L

Botão liga local - frente

Local push-button - start forward

B

L

R

L

Botão liga local - ré

Local push-button - start reverse

B

D

L

L

Botão desliga local

Local push-button - stop

X

A

Alarme de equipamento com defeito

Malfunction alarm

X

Y

Intertravamento

Interlocking

K

X

Intertravado

Interlocked

X

C

Estado

State

Y

C

Comando

Control

Y

C

Comando remoto

Remote mode set

0

1

Y

C

0

2

Comando modo manutenção

Maintenance mode set

Y

C

0

3

Comando reset geral

General reset command

Y

C

0

4

Comando Partir frente

Run foward command

Y

C

0

5

Comando Partir ré

Run reverse command

X

C

0

1

Operando modo remoto

Remote mode status

X

C

0

2

Operando modo manutanção

Maintenance mode status

X

C

0

3

Pronto para partir

Ready to start

X

C

0

4

Partindo

Starting

X

C

0

5

Funcionando frente

Running foward

X

C

0

6

Funcionando ré

Running reverse

X

C

0

7

Condição geral de falha

General faul condition

X

C

0

8

Parada pelo campo

Field stop status

X

C

0

9

Estado circuito de freios

Main & auxiliary circuit breaker status

X

C

1

0

Emergencia acionada(apenas para correias)

Pull rope status (conveyors only)

X

A

0

1

Subtensão

Supply under voltage fault

X

A

0

2

Sobretensão

Supply over voltage fault

X

A

0

3

Curto circuito

Load short circuit

X

A

0

4

Circuito aberto

Load open circuit

X

A

0

5

Sobrecorrente

Overcurrent

X

A

0

6

Falha de aterramento

Earth Fault

X

A

0

7

Perda de fase

Phase Losee

X

A

0

8

Motor parado por excesso de carga

Motor shall

I

I

Corrente atual

Actual current

K

Q

Horas funcionando

Toral running hours

J

I

Potência atual

Actual power - KW

J

Q

I

Consumo total

Total KWh

J

F

I

Fator de potência

Power factor

I

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 23

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 3.5.5

6

29.Mai.2008

Instrumentation and Control Code (Simeas) CODE

DESCRICAO

DESCRIPTION

V

I

0

1

Tensão da fase 1

Phase Voltages

E

I

0

2

Tensão da fase 2

Phase Voltages

E

I

0

3

Tensão da fase 3

Phase Voltages

I

I

0

1

Corrente da fase 1

Phase current

I

I

0

2

Corrente da fase 2

Phase current

I

I

0

3

Corrente da fase 3

Phase current

I

I

0

4

Corrente total

Total curent

J

I

0

1

Potencia real - KW

Real power - kW

J

I

0

2

Potencia aparente - kVA

Apparent power - kVA

J

I

0

3

Potencia reativa- kVAR

Reactive power - kVAR

J

F

I

Fator de potência

Power factor - cos Ö

J

Q

I

Consumo total

Total kWh

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 24

DOCUMENT NUMBER

PBA-P-000-000-PD-210 3.6 CODE

REVISION DATE 6

29.Mai.2008

Mechanical Equipment Code (Mine) DESCRICAO

DESCRIPTION

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 25

DOCUMENT NUMBER

REVISION

PBA-P-000-000-PD-210

6

3.7

DATE 6

29.Mai.2008

Mechanical Equipment Code (Smelter) CODE

A A A A A A A B B B B B B B B B B B B C C C C C C C C C C C C C C C C C C C C D D D D D E E E

C E G M Q S V A B C D E H L M P R V W A B C D F G H I J L N O P Q S T V W X Y A M P T U E J L

DESCRICAO Alimentadores de correia Coluna de eletrodo Agitadores, misturadores Amostradores Aquecedores Alimentadores de sapatas Alimentadores vibratórios Bomba centrifuga - líquidos limpos Balsa para bombas Bombas de combustíveis Bombas dosadoras Bomba hidráulica Balança Bombas Monho Bomba centrifuga - polpa Britadores Bombas de vácuo Caixa de sopro Canhão de ar Compressor de ar Colunas de flotacao Caldeiras Células de flotacao Cabeça de granulação Chutes Ciclones Container de transferência Calha Chaminé Coifa Container de mistura Câmara de combustão Canal de vazamento basculavel Canal de vazamento Unidade floculação/decantação Caixa, tanque de sucção de bomba Coletor Damper Detector de metal Disco de pelotização Distribuidor Duto Equipamento especial Ejetor Elevador

DESCRIPTION Belt feeders Electrode Column Ass' y Agitators, mixers Samplers Heaters Apron feeders Vibrating feeders Centrifugal pump - clean fluids Pump raft Fuel pumps Metering pumps Electrode arm Hydraulic pump Weightometer Monho pumps Centrifugal pump - slurry Crushers Vacuum pumps Blowing box Air cannon Air compressor Flotation columns Boilers Flotation cells Granulation head Chutes Cyclones Transfer car/Brooks Container Launder Stack Hood Tap hole drilling machine & mud gun Mixing car Combustion chamber Tilting launder Tapping launder Floc/decantation unit Box, pump sump Collector Damper Metal detector Pelletising disc Distributor Duct Special equipment Ejector Lift

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 26

DOCUMENT NUMBER

REVISION

PBA-P-000-000-PD-210 CODE E E E E E E F F F F F F G G G G H H J J K L L M M M M M M M O O P P P P P P P P Q R R R S S S S

M P S V X Z C E L P S Z A F L V C M E I S A S B G N O S X Z C L A E F M N R S T U A E H B C D F

DESCRICAO Empilhadeira Espessador / Clarificador Equipamentos de segurança Evaporador Exaustores Estação (de oxigenio, de dessulfurisacao) Calcinadores Forno elétrico Filtro Forno Panela Fornos secadores rotativos Manta de revestimento de lagoa Garra hidráulica Grelha fixa / Basculante Guindaste de lança Grelha vibratória Hidrociclone Talha móvel Junta de expansão Jigs Scanner Térmico Equipamento de Laboratório Suporte de Panela Maquina de briquetagem Moega Manifold Moinhos Mineral sizer Misturador \ Umidificador Miscelâneas Lança de oxigênio Pacote Peneiras vibratórias Perfuratriz Panela de metal Peneiras de rolos Ponte rolante Panela de escoria Precipitador eletrostático Queimadores Raspador Retomadora Rompedor hidráulico Lavador de Gases Secadores Sistema de dosagem Separador de fagulhas

DATE 6

29.Mai.2008

DESCRIPTION Stacker Thickener / Clarifier Safety equipment Evaporator Exhaust fans (Oxigen, dessuphurisation) Station Rotary Kilns Electric furnace Filter / Bin Vent Ladle Furnace Rotary Dryers Pond liner Clamshell Fixed grizzly / Tipping grizzly Jib crane Vibrating grizzly Hydrocyclone Monorail hoist Expansion joint Jigs Kiln Scanner Laboratory equipment Laddle Support Briquetting Machine Hopper Manifold Mills Mineral sizer Mixer/Moisturiser Miscelaneous Isolation plate (blind) Oxygen lance Package Vibrating screens Drilling machine Metal laddle Roller screens Over head crane Slag ladle Electrostatic precipitator Burners Scraper Reclaimer Rock breaker Scrubber Dryers Dosing system Spark separator

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 27

DOCUMENT NUMBER

REVISION

PBA-P-000-000-PD-210 CODE

DESCRICAO

DATE 6

29.Mai.2008

DESCRIPTION

S S S T T T T T T T T T T T T T T T T U V V V V V V

I L M A B C E H L M N O P Q R S T X Z H A B C D E F

Silenciador Silos, silos pulmão Sistema agitação com gás Transportador de arraste Chute tipo tromba Transportador de correia Trocador de calor Transportadores helicoidais Talha elétrica Tambor misturador / desaguador Talha manual Trommels Transportador pneumático Tanques Torres de resfriamento Calha transportadora Máquina de basculamento Extrator de sucata Maquina fechamento furo escória Unidade hidráulica Tanques pressurizados Válvula de barras Conjunto de Valvulas Válvula radial Ventiladores, sopradores Válvula Faca/Guilhotina

Silencer Silos, bins Gas stirring system Drag conveyor Spout,Tunck, Extendible chute Belt Conveyor Heat exchanger Screw conveyors Electrical hoist Dewatering / mixing drum Chain Block / Manual hoist Trommels Pneumatic screw pump Tanks Cooling towers Slide conveyor Tilting machine Tramp iron extractor Slag stopper machine Hydraulic power unit Pressure vessels Bar valves Valve train Radial valve Fans, blowers Knife Valve /Guillotine Valve/ Slide valve

V V V V V V

G M P R T X

Válvula mangote Válvula Borboleta Válvula Pendular Válvula rotativa Vaso de transferência Vent de Segurança contra explosão

Pinch valve Butterfly Valve Pendullum Valve Rotary valve Transfer vessel Explosion Vent

V W X X Z

Y H V X H

Cilindro pneumático Guincho Válvula de Bloqueio Caixa / invólucro Cilindro hidráulico

Pneumatic cylinder Winch Block Valve Housing / Enclosure Hydraulic cylinder

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 28

DOCUMENT NUMBER

PBA-P-000-000-PD-210

3.8 6

REVISION DATE 6

29.Mai.2008

Electrical Equipment CODE

DESCRICAO

DESCRIPTION

A B B E C C C C D D D D D E E E E G G

A T X C M R U Z B C G J S B C G O E M

Alarmes, sirenes Baterias Carregador de Baterias Coluna elétrica Controle de Motores - CCM Capacitor Cubículo Controlador programável Caixa de derivação Trocador de Tap Chave de aterramento Disjuntor Chave seccionadora Freio elétrico Coluna de eletrodo Elétrica - geral Estação de Operação Gerador Unidade de geração de emergência

Alarms, sirens Batteries Battery charger Electric Column Motor Control - MCC Capacitor Cubicle PLC By pass box Tap Changer Earthing Switch Circuit breaker Disconnecting switch Electric Brake Electrode Column Electrical - General Operating Station Generator UPS

G H H I I J J L L L M M M N P P P P P P P P Q Q R R

R E S C M B P D O T D E V K B C D G H L P X D F D M

Controlador Tiristorizado Aquecedor Elétrico Sistema de Alta Corrente Trafo controle / instrumentação Impressora Caixa de junção Caixa de Junção Profibus

Gradator Electric Heater High Current System Instrument /control transformer Printer Junction box Profibus Juction Box Locking Device electric Local terminal operator Lighting transformer Module Electric Motors Monitor de Video Nobreak Pull box Control panel Power supply distrib. board 120V General panel Hidraulic Panel Electrical panel Pneumatic Panel Lighting arrester Low voltage distribution board Medium voltage switchgear Distribution line Radio Modem

Terminal de operação Transformador de iluminação Modulo Motores elétricos Video Monitor Sistema alimentação ininterrupta Caixa de passagem Painel de controle Quadro de distribuição 120V Painel geral Painel Hidráulico Painel elétrico Painel Pneumático Pára-raios Quadro de distribuição Quadro de força Rede de distribuição Radio Modem

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 29

DOCUMENT NUMBER

REVISION DATE

PBA-P-000-000-PD-210 CODE

DESCRICAO

6

29.Mai.2008

DESCRIPTION

R

P

Painel I/O remoto

Remote I/O Panel

R R S S S S T T T V V W

S T P S V W F I V S W S

Resistor de aterramento Retificadores Chave paco Chave de partida suave Servidor

Grouding resistor Rectifiers Pole Mounted Disconnecting Switch Soft start Server Network Switch Transformers Current transformer Potential transformer Variable speed Video wall Engineering workstation

Transformadores Transformador de corrente Transformador de potencial Variador de velocidade Telão Estação de trabalho

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 30

DOCUMENT NUMBER

PBA-P-000-000-PD-210 3.9 CODE

REVISION DATE 6

29.Mai.2008

General DESCRICAO

DESCRIPTION

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 31

DOCUMENT NUMBER

PBA-P-000-000-PD-210 3.10 CODE

REVISION DATE 6

29.Mai.2008

Maintenance Code DESCRICAO

DESCRIPTION

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 32

DOCUMENT NUMBER

PBA-P-000-000-PD-210 3.11

DATE 6

29.Mai.2008

Fluids Code CODE

A A A A A A A A A A C D E G G G H I L L N O O O P P R R

REVISION

DESCRICAO B C D F G I L P Q W R E F C F S Á A A P I C L X O P E Q

Água Bruta Acido Cloridrico Água Desmineralizada Água de REsfriamento - Alimentação Água de Gaxeta Água de Incêndio Alcool Água Potável Água Quente Água de Processo Água de Resfriamento - Retorno Diesel Efluentes Líquidos Gás do Calcinador Gás do Forno Gás do Secador Ar Comprimido - Alta Pressão Ar de Instrumentação Ar Comprimido - Baixa Pressão GLP Nitrogênio Óleo Combustível Óleo Lubrificante Oxigênio Pó, Poeira Polpa Rejeitos Reagentes Químicos - Geral

DESCRIPTION Raw Water Hydrochloric Acid Demineralised water Cooling Water - Inlet Gland Service Water Fire Water Alcohol Drinking water Hot water Process water Cooling water - outlet Diesel Liquid effluents Kiln off gas Furnance off gas Dryer off gas High pressure air Instrumentation air Low pressure air LPG Nitrogen Heavy fuel oil Lubricant oil Oxigen Dust Slurry Tailings (slurry) Chemicals - general

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 33

DOCUMENT NUMBER

PBA-P-000-000-PD-210 3.12

REVISION DATE 6

Piping Material Code

CODE

D E S C R IC AO

D E S C R IP T IO N

A

C

A ç o carbono

M ild S reel

C

I

F erro F undido

C ast Iron

H

P

P oilietileno de alta densidade

H P D E - H igh desns ity P olyethilene

B

Z

B ronze

B ronze

C

S

A ç o F undido

C ast S teel

C

R

C oncreto

C oncrete

F

G

F ibra de V idro

F iber glas s

F

R

F ibra de V idro reforçada com plastico

F iber glass reinforced plas tic

G

A ç o galvanizado

G alvanised m ild steel

A

29.Mai.2008

G

L

G lass lined

H

L

H alar

H

Y

H astelloy C 276

S

G

M ild steel glass lined

S

P

M ild steel polypropylene

S

L

M ild steel P T F E lined

S

R

M ild steel P V C lined

S

B

M ild steel rubber lined

P

P

P

V

R

H

M angueira B orracha R eforçada

R e-inforced rubber hose

S

S

A ç o Inox - 316 L

S tainless steel 316 L

P olipropileno

P olypropylene P V C - P oly V inyl C hloride

G:\Barro Alto II\B Project Management\B09 Project Procedures\Engineering Procedures\FAO 29.05.08{Procedures WBS-IF Rev 6}.doc

Page 34

Related Documents

Beverages (fao)
January 2021 1
Fao Nutricion 1994
March 2021 0
Fao Mleko Web
January 2021 1
Radiologia Rev
February 2021 1

More Documents from "Elio"