BLOCK A GAS DEVELOPMENT PROJECT
Document No : BLA--JMN-I-TB-10-001 Rev. Page 1 of 5 0
FIRE ALARM SYSTEM TECHNICAL BID EVALUATION Contract No.3510005633
TECHNICAL BID EVALUATION
v
ISSUED FOR APPROVAL X
CLASS 1
REV
DATE
CLASS 2
CLASS 3 CONTRACTOR
COMPANY
PURPUSE PREP’D CHK’D
APP’D
0
08-Nov-2018
IFC
YD
MS
TYI
A
03-Nov-2018
IFA
YD
MS
TYI
APP’D
BLOCK A GAS DEVELOPMENT PROJECT FIRE ALARM SYSTEM TECHNICAL BID EVALUATION Contract No.3510005633
Document No : BLA-JMN-I-TB-10-001 Rev. Page 2 of 5 0
Record of Revision Rev No
Section
A
Technical Bid Evaluation
0
Vendors Comparation Table
Page No All
Description of Changes First Submission
Attachment Issued For Construction Table
BLOCK A GAS DEVELOPMENT PROJECT FIRE ALARM SYSTEM TECHNICAL BID EVALUATION Contract No.3510005633
Document No : BLA-JMN-I-TB-10-001 Rev. Page 3 of 5 0
Table Of Content 1. 2. 3. 4. 5.
Introduction…………………………………………………………………………….4 Purpose……………………………………………………………..…………………..5 Reference……………………………………………………………………………….5 Scope………………………………………………………………………………….…5 Comparation Table…………………………………………………………………….6
BLOCK A GAS DEVELOPMENT PROJECT FIRE ALARM SYSTEM TECHNICAL BID EVALUATION Contract No.3510005633
Document No : BLA-JMN-I-TB-10-001 Rev. Page 4 of 5 0
1. INTRODUCTION PT Medco E&P Malaka, henceforth referred as Company, intends to develop Block-A gas reserves for sales gas supplying to PT Pertamina. The fields of Alur Siwah, Alur Rambong and Julu Rayeu are to be developed in Block-A. All fields are located in East Aceh Region, Aceh Province, Indonesia. PT. Jasa Mandiri Nusantara (JMN) is awarded for EPC to design and develop utility buildings at CPP under Contract #3510005633 with the project’s name: ‘OFFSITE BUILDING PHASE 2 BLOCK-A ACEH’. Figure 1-1 shows the map of the project.
Fig 1-1 Site Map of Block-A CPP and Offsite Building Phase-2
BLOCK A GAS DEVELOPMENT PROJECT FIRE ALARM SYSTEM TECHNICAL BID EVALUATION Contract No.3510005633
Document No : BLA-JMN-I-TB-10-001 Rev. Page 5 of 5 0
2. PURPOSE The Contractor shall engage the Technical Bid Evaluation to compare vendors with technical specification 3. REVERENCE 3.1. RKS 3.2. Preferred Manufacture List 3.3. AML 4. SCOPE Fire Alarm System for EPC-3B 5. Vendors Comparation Table (see next page)
TECHNICAL BID EVALUATION(TBE) DOC NO. CLIENT PROJECT ITEM
NO 1
2
: : PT. MEDCO E&P MALAKA : OFFSITE BUILDING EPC 3B : FIRE AND GAS SYSTEM
DESCRIPTION GENERAL Brand Bidder's Country Head Office Vendor Delivery time Acceptence Test Testing and Commissioning Vendor Warranty Vendor Document SCOPE OF SUPPLY Loop Isolator Module (LIM) Relay IAM (RIM) Addressable Manual Call Point Addressable Smoke Detector (Indoor) Addressable Fixed Heat Detector Alarm Bell Visual Alarm FDJB Summary
Please attach vendor quotation..
LEGEND A : Acceptable Deviation / Alternative C : Comply NC : Not Comply VTA : Vendor to Advise
REQUIREMENT
Please refer to MTO & Datasheet ? ? ? ? ? ? ?
PT. TRIYASA SUKSES MAKMUR EVALUATION
PT. SEMACOM INTEGRATED EVALUATION
REMARK
Simplex Indonesia Medan 8 Weeks Medan/Jakarta Yes Yes ? Yes
C C C C C C C C
Siemens Indonesia Jakarta 8 Weeks Jakarta Yes Yes Yes
A C C C C C C C
Simplex LIM (IDNET) Simplex RIM (IDNET) Manual Call Point Simplex 4099-9002 Photoelectric Simplex 4098-9601 Heat Detector Simplex 4098-9733 Simplex Alarm Bell Simplex Truealart Indoor Junction Box
C C C C C C C C
N/A N/A MCP (FDM221/FDMH291-R/FDMH291-Y/FDM226-RG/FDM226-RP) Multi Sensor Smoke Detector (OOH740), Linear Smoke Detector Heat Detector (HI720/HI722) Alarm Sounder with Optical Indication (FDS229-R) Alarm Sounder with Optical Indication (FDS229-R) Indoor Junction Box
NC NC A A A A A C
Comply
C
Not Comply
NC