MSc Project Management

Gantt Chart

Hours

Date

Week2

1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.1 2 2.1 2.2 2.3 2.4 2.5 2.6 3 3.1 3.2 3.3 3.4 3.5 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.1 4.1 4.1 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9

site Name and address 1 1 1 1 1 1 1 1 1 1 2 3 3 2 3 3 3 2 1 2 4 3 5 5 5 5 5 5 6 7 5 6 6 6 3 3 3 3 5 6 7 7 7

Key

Planning/start of the project Discuss project with the client Creat and hand in project proposal Client consultation Discussion on TOR with supervisor Create draft of Terms of Reference (TOR) Get TOR signed off by client Preperation of Gantt chart and Schedule Risk Identification. Getting TOR, Gantt Chart and Schedule signed by supervisor First reveiw preparation and session. Litrature Survey Research of litrature on risk management Evaluate research materials and classify its relevance to the project To search the relevent tools used for identification of risk control methods research on different techniques used for assessment of risk Comprehensive Review of research material and drafting research chapter Update second review documents Second review preperation and session Research of methods of improvement on risk management and Quality management in construction projects Discuss current risk management system of client's company with supervisor Review the documents and analyse the theories and concepts Extensive research of methodology Define and elaborate research methods plus drafting 3rd chapter Data collection from client's company Analysis of current risk management plan adopted by client's organization Comparison of client's strategy for risks with other organizations Discussion on questionnaire with client Analysis of Interviews and literature to support the development of integrated tool Drafting of 4th Chapter (Research Analysis and Results) Investigation of lapses in risk management strategy adopted by client's company Critical Evaluation of the result with client requirement Suggesting a Risk Management strategy Drafting of chapter 5(A proposed risk management plan) Evaluation of Research Objectives Evaluation of questionnaire Drafting of 6th Chapter (Evaluation) Dissertation Phase Finalizing Methodology and Research Analysis Chapter Finalizing Evaluation Chapter Produce draft dissertation formulating risk management strategy for the client. Discussion on final outcomes with the client Critical evaluation of the overall project. Discussion on draft dissertation with supervisor Revise and finalize dissertation Printing and submission of dissertation

actual weekly hours actual cumulative hours planned duration actual duration (and hours) Milestones

Week3

Week4

Muhammad Uzair

Week5

Week6

Week7

Week8

Week9

Week10

Week11

MSc Project Management

Task Objective Task Description Planning/start of the project

1

Schedule

Hours

Muhammad Uzair

Start date planned actual

planned

End date actual

Planned deliverables

0

1.1

1 Discuss project with the client

18

9/5/2011

9/26/2011

9/7/2011

9/28/2011 Project decision and client consultation

1.2

1 Creat and hand in project proposal

19

9/7/2011

9/28/2011

9/9/2011

9/30/2011 Project proposal preperation

1.3

1 Client consultation

25

9/12/2011

10/3/2011

9/15/2011

1.4

1 Discussion on TOR with supervisor

1.5

10/7/2011 Client requirements

4

9/16/2011 10/10/2011

9/22/2011 10/10/2011 TOR discussed with supervisor

1 Create draft of Terms of Reference (TOR)

5

9/23/2011 10/10/2011

9/24/2011 10/10/2011 TOR draft prepeared

1.6

1 Get TOR signed off by client

5

9/24/2011 10/10/2011

9/24/2011 10/10/2011 Sending and receiving TOR to client via Email

1.7

1 Preperation of Gantt chart, and Schedule

4

9/26/2011 10/11/2011

9/28/2011 10/11/2011 Gantt chart and Schedule prepeared

1.8

1 Risk Identification.

4

9/30/2011 10/11/2011

9/30/2011 10/11/2011 Risks assessment

1.9

1 Getting TOR, Gantt Chart and Schedule signed by supervisor

4

10/1/2011 10/12/2011

10/1/2011 10/12/2011 Deliverables for 1st review prepared

1.1 2

1 First reveiw preparation and session. Litrature Survey

8 0

10/5/2011

10/5/2011

2.1

2 Research of litrature on risk management

35

10/6/2011 10/12/2011

10/8/2011 10/14/2011 Research Material gathered

2.2

2 Reading and analyzing research material

37

10/9/2011 10/17/2011

10/12/2011 10/19/2011 Researach material analyzed

2.3

3 Identification of risk control methods

24 10/12/2011 10/20/2011

10/15/2011 10/21/2011 methods studied

2.4

3 Research on different techniques used for assessment of risk

24 10/16/2011 10/24/2011

10/19/2011 10/25/2011 Risk assesment techniques researched

2.5

3 Comprehensive Review on Existing risk management and Quality management in construction projects

29 10/19/2011 10/25/2011

10/23/2011 10/27/2011 Research material reviewed

2.6 3

3 Update second review documents 3 Second review preperation and session

12 10/24/2011 10/27/2011 8 10/31/2011 10/31/2011

10/28/2011 10/28/2011 Documents updated for Second Review 10/31/2011 10/31/2011 Second Review

3.1

4 Research of methods of improvement on risk management and Quality management in construction projects

38 10/31/2011 31-11-2011

10/30/2011

3.2

1 Discuss current risk management system of client's company with supervisor

32

11/1/2011

11/3/2011

11/3/2011

11/7/2011 view of supervisor obtained

3.3

2 Review the documents and analyse the theories and concepts

21

11/4/2011

11/7/2011

11/6/2011

11/8/2011 Important theories reviewed

3.4

4 Extensive research of methodology

13

11/7/2011

11/9/1900

11/8/2011

11/9/2011 Variouse Methodology of Research Studied

3.5 4

3 Define and elaborate research methods Data collection from client's company

13 0

11/9/2011 11/10/2011

11/10/2011 11/10/2011 Methodology of research selected

4.1

5 Analysis of current risk management plan adopted by client's organization

13 11/11/2011 11/11/2011

11/11/2011 11/11/2011 relavent data received and studied

4.2

5 Comparison of client's strategy for risks with other organizations

14 11/12/2011 11/14/2011

11/13/2011 11/14/2011 Company's risk plan compared and analysed

4.3

5 Discussion on questionnaire with client

12 11/14/2011 11/15/2011

11/14/2011 11/15/2011 Notes taken about client's requirements

4.4

5 Analysis of Interviews and literature to support the development of integrated tool

14 11/15/2011 11/16/2011

11/17/2011 11/16/2011 interviews and literature analyzed

4.5

5 Drafting of 4th Chapter (Research Analysis and Results)

24 11/17/2011 11/17/2011

11/19/2011 11/18/2011 chapter 4 drafted

4.6

5 Investigation of lapses in risk management strategy adopted by client's company

12 11/20/2011 11/21/2011

11/21/2011 11/21/2011 lapses identified

4.7

6 Critical Evaluation of the result with client requirement Suggesting a Risk Management strategy Drafting of chapter 5(A proposed risk management strategy) Evaluation of Research Objectives Evaluation of questionnaire

4.8 4.9 4.1 4.11

7 5 6 6

4.12 5

th 6 Drafting of 6 Chapter (Evaluation) Dissertation Phase

9 11/22/2011 11/22/2011 5 13 12 13

11/24/2011 11/25/2011 11/27/2011 11/28/2011

11/22/2011 11/23/2011 11/24/2011 11/25/2011

13 11/29/2011 11/28/2011 0 8 11/29/2011 11/29/2011

5.4

3 Finalizing Methodology and Research Analysis Chapter 6 Finalizing Evaluation Chapter and review of proposed risk management strategy 8 Produce draft dissertation 5 Formulating strategy for the client.

5.5

5 Discussion on final strategy parameters with the client

5.6

7 Critical evaluation of the overall project. 8 Discussion on draft dissertation with supervisor

5.1 5.2 5.3

5.7 5.8 5.9

8 Revise and finalize dissertation 8 Printing and submission of dissertation

First review

11/3/2011 areas of improvement explored

11/23/2011 11/22/2011 evaluation of result 11/24/2011 11/26/2011 11/27/2011 11/29/2011

11/22/2011 11/23/2011 11/24/2011 11/25/2011

Deliverables of project reviewed chapter 5th drafted research objectives reviewed questionnaires data studied

11/29/2011 11/28/2011 chapter 6 drafted 11/30/2011 11/29/2011 3rd and 4th chapter finalized

6 7

12/1/2011 11/29/2011 11/3/2011 11/30/2011

11/2/2011 11/29/2011 5th and 6th cahpter fianlized final recommendation reviewed 12/3/2011 11/30/2011 Dissertation shown and discussed with supervisor

6

12/3/2011 11/30/2011

12/3/2011 11/30/2011 Strategy prepeard

6

12/3/2011

12/1/2011

12/4/2011

12/1/2011 Client's requirement incorporated in final formation of strategy

8

12/4/2011

12/1/2011

12/4/2011

12/1/2011 Project final evaluation

7 7 8

12/4/2011 12/5/2011 12/5/2011

12/2/2011 12/2/2011 12/5/2011

12/4/2011 12/5/2011 12/5/2011

12/2/2011 Draft of dissertation showed to Supervisor 12/2/2011 Revision of dissertation 12/5/2011 Final submission

MSc Project Management

Total planned hours

Schedule

599

Muhammad Uzair