GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

FICHA DE CONTROL DE OBRA OBRA

:

“MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S – ZEPITA”

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI : ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL : FEBRERO - 2012 : YUNGUYO, 15 DE ABRIL DEL 2012

META INFORME AL MES DE FECHA DE INFORME

1.- DATOS GENERALES SECTOR PLIEGO UNIDAD EJECUTORA FUNCION PROGRAMA

: : 458 : 001 : 15 00005 :

SUB PROGRAMA

: 0065

ACTIVIDAD O PROYECTO

: 4000072 MEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

COMPONENTE

: 2123010

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

META

: 00002

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

OBRA

:

MEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

PROVINCIA DISTRITO

: : :

YUNGUYO - CHUCUITO JULI COPANI - ZEPITA

LOCALIDAD

:

COPANI - ZEPITA

: 0004 0005 1-18 :

DONACIONES Y TRANSFERENCIAS RECURSOS DETERMINADOS

CODIGO SNIP UBICACIÓN

PRESIDENCIA DEL CONSEJO DE MINISTROS GOBIERNO REGIONAL DEL DEPARTAMENTO DE PUNO SEDE PUNO TRANSPORTE REDUCCION DEL COSTO, TIEMPO E INSEGURIDAD VIAL EN EL SISTEMA DE TRANSPORTE TERRESTRE VIAS DEPARTAMENTALES

2.- DATOS FINANCIEROS FUENTE(S) DE FINANCIAMIENTO RUBRO (S) MODALIDAD DE EJECUCION CONVENIO (*) Si corresponde

: :

ADDENDA AL CONVENIO (*) Si corresponde

:

CANON Y SOBRE CANON, REGALIAS, RENTAS DE ADUANAS Y PARTICIPACIONES ADMINISTRACION DIRECTA Nº FECHA Entre el Gobierno Regional y la Municipalidad de suscrito por el Sr…………………. Alcalde Nº…….. al convenio Nº…….. FECHA…………. Entre el Gobierno Regional y la Municipalidad de suscrito por el Sr…………………. Alcalde

EXPEDIENTE TECNICO INICIAL

GR PUNO

MUNICIPALIDAD

TOTAL

(1)

COSTO DIRECTO GASTOS GENERALES

: :

S/. S/.

8,351,647.97 304,202.46

0.00 0.00

GASTOS SUPERVISION GASTOS LIQUIDACION GASTOS EXPEDIENTE TECNICO TOTAL

: : : :

S/. S/. S/. S/.

123,794.26 24,619.03 21,951.92 8,826,215.64

0.00 0.00 0.00 0.00

8,351,647.97 304,202.46 123,794.26 24,619.03 21,951.92 8,826,215.64

(1) Considerar solo si hay aporte de otra entidad para ejecutar la obra

RESOLUCION DE APROBACION

:

RGGR Nº 264-2011-GGR-GR PUN FECHA: 23-09-2011

:

* Resolución de Aprobación * Fotocopia del Acta de Inicio considerado en el cuaderno de obra * Presupuesto Analítico Inicial

DOCUMENTOS A ADJUNTAR

:

EXPEDIENTE TECNICO DE AMPLIACION PRESUPUESTAL POR MAYORES METRADOS COSTO DIRECTO

:

S/.

NO CORRESPONDE

GASTOS GENERALES

:

S/.

NO CORRESPONDE

GASTOS SUPERVISION

:

S/.

NO CORRESPONDE

TOTAL DOCUMENTO (S) SUSTENTATORIO (S) * Del Residente de Obra

:

S/.

NO CORRESPONDE

:

NO CORRESPONDE

*

De la Sub Gerencia de Obras y E.M.

:

NO CORRESPONDE

*

Del Supervisor de Obra

:

NO CORRESPONDE

*

De la Of. Reg. Supervisión y L.O.

: :

NO CORRESPONDE

* Resolución de Aprobación DOCUMENTOS A ADJUNTAR

:

RGGR Nº FECHA * Documento (s) sustentatorio (s) * Presupuesto Analítico por Mayores Metrados

EXPEDIENTE TECNICO DE AMPLIACION PRESUPUESTAL POR PARTIDAS NUEVAS COSTO DIRECTO : S/. NO CORRESPONDE GASTOS GENERALES : S/. NO CORRESPONDE GASTOS SUPERVISION : S/. NO CORRESPONDE TOTAL : S/. NO CORRESPONDE DOCUMENTO (S) SUSTENTATORIO (S) NO CORRESPONDE * Del Residente de Obra : NO CORRESPONDE * De la Sub Gerencia de Obras y E.M. : NO CORRESPONDE * Del Supervisor de Obra : NO CORRESPONDE * De la Of. Reg. Supervisión y L.O. : : * Resolución de Aprobación RGGR Nº FECHA DOCUMENTOS A ADJUNTAR * Documento (s) sustentatorio (s) : * Presupuesto Analítico por Partidas Nuevas

MODIFICACION (ES) DE PRESUPUESTO ANALITICO DOCUMENTO (S) SUSTENTATORIO (S) * Del Residente de Obra : * De la Sub Gerencia de Obras y E.M. : * Del Supervisor de Obra : * De la Of. Reg. Supervisión y L.O. : : * Resolución de Aprobación DOCUMENTOS A ADJUNTAR :

NO CORRESPONDE NO CORRESPONDE NO CORRESPONDE NO CORRESPONDE RGGR Nº FECHA * Documento (s) sustentatorio (s) * Presupuesto Analítico Modificado

3.- PLAZOS DE EJECUCION DE OBRA : SEGÚN EXPEDIENTE TECNICO INICIAL FECHA DE INICIO FECHA DE TERMINO PLAZO DE EJECUCION (DIAS) RESOLUCION DE APROBACION DOCUMENTOS A ADJUNTAR

: : : : :

AMPLIACION (ES) DE PLAZO FECHA DE AMPLIACION DIAS DE AMPLIACION DOCUMENTO (S) SUSTENTATORIO (S) * Del Residente de Obra * De la Sub Gerencia de Obras y E.M. * Del Supervisor de Obra * De la Of. Reg. Supervisión y L.O. * Resolución de Aprobación DOCUMENTOS A ADJUNTAR PARALIZACION (ES) DE OBRA FECHA DE PARALIZACION DIAS DE PARALIZACION DOCUMENTO (S) SUSTENTATORIO (S) * Del Residente de Obra * De la Sub Gerencia de Obras y E.M. * Del Supervisor de Obra * De la Of. Reg. Supervisión y L.O. * Resolución de Aprobación DOCUMENTOS A ADJUNTAR FECHA REAL DE CONCLUSION DE OBRA

: : : : : : : :

: : : : : : : : :

23 DE SETIEMBRE DEL 2011 21 DE DICIEMBRE DEL 2011 90 DIAS CALENDARIO RGGR Nº 264-2011-GGR-GR PUN FECHA: 23-09-2011 * Resolución de Aprobación * Fotocopia del Acta de Inicio considerado en el cuaderno de obra

DESDE:

HASTA:

EN TRAMITE NO CORRESPONDE NO CORRESPONDE NO CORRESPONDE RGGR Nº FECHA * Documento (s) sustentatorio (s)

DESDE:

HASTA:

NO CORRESPONDE NO CORRESPONDE NO CORRESPONDE NO CORRESPONDE RGGR Nº FECHA * Documento (s) sustentatorio (s)

4.- AVANCE DE OBRA AL MES DE : AVANCE FISICO

FISICO EN S/. FISICO EN %

ANTERIOR

: :

AVANCE FINANCIERO

FINANCIERO EN S/. FINANCIERO EN % DOCUMENTOS A ADJUNTAR

: : :

ACTUAL

ACUM.

SALDO

903,392.38

90,680.16

994,072.54

8,750,699.30

10.23%

1.03%

11.26%

88.74%

ANTERIOR

ACTUAL

ACUM.

SALDO

1,388,958.18 15.74%

135,738.60 1.54%

1,524,696.78 17.27%

7,301,518.86 82.73%

* Valorización Mensual de obra con VºBº del supervisor de obra. * Reporte de Ejecución Presupuestaria Mensual * Panel Fotográfico impreso y en archivo

5.- DESCRIPCION DEL PROYECTO El Tramo II contempla la construcción de 13,140.00 m. de pavimento flexible (carpeta asfáltica 2"), con un ancho de vía de 6.50 m.; además de la construcción de cunetas en ambos lados de la vía; por otro lado se ejecutará la señalización vertical y horizantal a fin de garantizar la transitabilidad.

6.- OBJETIVOS DEL PROYECTO El objetivo principal del proyecto consiste en ejecutar la Infraestructura Vial en las Provincias de Yunguyo – Chucuito de la Región de Puno a fin de que las mismas brinden un optimó servicio de transitabilidad en beneficio de los pobladores en general de la zona. Por ser de competencia de los gobiernos regionales. Mejorar la Infraestructura Vial Lograr el beneficio social de la zona Mejorar la calidad de vida de los pobladores del lugar Contribuir a mejorar la imagen de la región Interconexión rápida y adecuada con otras vías principales de la región.

7.- PROBLEMAS Y/O DIFICULTADES PRESENTADOS DURANTE EL PROCESO DE EJECUCION DE OBRA La dificultades que se vienen presentando en obra son las siguientes: - Se vienen presentando precipitaciones pluviales en la zona. - La maquinaria perteneciente al Gobierno Regional de Puno viene incumpliendo con los rendimientos óptimos.

8.- ACCIONES TOMADAS PARA LA SOLUCION DE PROBLEMAS Y/O DIFICULTADES PRESENTADOS DURANTE EL PROCESO DE EJECUCION DE OBRA Se vienen tomando las siguientes acciones inmediatas: - Se ha paralizado parte de la maquinaria pesada para evitar gastos insulsos - Es necesario que se efectue el cambio de operadores de maquinaria el cual fue solicitado a la Sub Gerencia de Equipo Mecánico.

9.- DATOS PERSONALES DE LOS EJECUTORES DE OBRA SUPERVISOR DE OBRA NOMBRES Y APELLIDOS PROFESION DIRECCION TELEFONO DOCUMENTO DE DESIGNACION FECHA DE DESIGNACION

: : : : : :

WILBER MAMANI APAZA INGENIERO CIVIL JR. CARABAYA 951646279 MEMORANDUM N° 22 DE SETIEMBRE DEL 2011

RESIDENTE DE OBRA NOMBRES Y APELLIDOS PROFESION DIRECCION TELEFONO DOCUMENTO DE DESIGNACION FECHA DE DESIGNACION

: : : : : :

MARCO ANTONIO ALIAGA ARPASI INGENIERO CIVIL URB. CHANU CHANU I ETAPA I-15c 951166927 Memorandum N° 627-2011-GR PUNO/GRI 15 DE SETIEMBRE DEL 2011

ASISTENTE ADMINISTRATIVO DE OBRA NOMBRES Y APELLIDOS PROFESION DIRECCION TELEFONO DOCUMENTO DE DESIGNACION FECHA DE DESIGNACION

: : : : : :

SOLEDAD FERNANDEZ MAMANI TECNICO CONTABILIDAD Y COMPUTACION JR. JOSE GALVEZ N° 164-2 PUNO 951981557 MEMORANDUM N° 064-2011-GR-PUNO/GRI 1/24/2011

ASISTENTE TECNICO DE OBRA NOMBRES Y APELLIDOS PROFESION DIRECCION TELEFONO DOCUMENTO DE DESIGNACION FECHA DE DESIGNACION

: : : : : :

Bach. Jose Manccini Roman Espinoza Ing. Agricola Jr. Carlos Rubina N°241

NOTAS

:

Memorandum N°

En el caso que no sea de aplicación a la obra, considerar como "NO CORRESPONDE" Esta ficha de control debe ser firmado por el Residente y Supervisor de Obra

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

PLANTILLA DE CONTENIDO DE INFORME MENSUAL DE OBRA OBRA

“MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S – ZEPITA”

MES

FEBRERO - 2012 SI

1

DOCUMENTO DE REMISIÓN DEL INFORME

2

CARÁTULA DEL INFORME

3

CONTENIDO DEL INFORME (INDICE)

4

PLANO DE UBICACIÓN DEL PROYECTO

5

MEMORIA DESCRIPTIVA

NO

OBSERVACIONES

Datos Generales; Localización Fecha de Inicio; Fecha de Término Datos Presupuestales Descripción del Proyecto Responsables de la Ejecución 6

INFORMACIÓN DE LA OBRA Descripción de las partidas valorizadas y del avance Comparativo Físico Financiero mensual y acumulado ( % )

7

INFORMACIÓN DE LAS VALORIZACIONES DE LA OBRA CUADRO DE METRADOS EJECUTADOS CUADRO COMPARATIVO DE METRADOS ACUMULADOS VALORIZACIÓN PRINCIPAL DE LA OBRA SEGÚN PRESUPUESTO BASE VALORIZACIÓN POR MAYORES METRADOS (Cuando Corresponda) VALORIZACIÓN DE ADICIONALES POR PARTIDAS NUEVAS (C. Corresp.) VALORIZACIÓN POR PARTIDAS VINCULANTES (Cuando Corresponda) RESUMEN DE LA VALORIZACIONES POR METAS RESUMEN DE LA VALORIZACIONES ACUMULADA AVANCE COMPARATIVO DIAGRAMA DE GANT FISICO Y FINANCIERO HISTOGRAMA DEL AVANCE DE OBRA PROYECCIÓN DE LOS TRABAJOS PRÓXIMO MES CONTROL RECURSO MANO DE OBRA CONTROL DE GASTOS GENERALES, GASTOS DE SUPERVISION

8

INFORMACION FINANCIERA RESUMEN DE LA EJECUCION PRESUPUESTAL (CD, GG, SUPER. EXP. TEC.) RESUMEN DEL REPORTE FINANCIERO CALENDARIO DE COMPROMISOS MENSUAL EJECUCION DE CALEND. DE COMPROMISOS (C/P, PLANILLAS, OTROS) CRONOGRAMA VALORIZADO DE OBRA MANIFIESTO DE GASTOS POR PARTIDAS ESPESIFICAS PRESUPUESTO PROGRAMADO VS EJECUTADO RELACION SEGÚN ORDEN DE COMPRA RELACION SEGÚN ORDEN DE SERVICIO VALORIZACION DE MATERIALES EN CANCHA PRESUPUESTO ANALITICO MENSUALIZADO

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

PLANTILLA DE CONTENIDO DE INFORME MENSUAL DE OBRA HOJA DE TAREOS PLANILLA DE JORNALES MOVIMIENTO DE ALMACEN RESUMEN DE HORAS MÁQUINA Y EQUIPOS RESUMEN DE COMBUSTIBES y LUBRICANTES

9

ANEXOS COPIA DE PARTES DIARIOS DE MAQUINARIA COPIA DE CONTROL DE LAS PRUEBAS DE CALIDAD COPIA DE LAS HOJAS DEL CUADERNO DE OBRA COPIA DEL LEVANTAMIENTO DE OBSERVACIONES PANEL FOTOGRÁFICO OTROS (

Acta de inicio de obra, Acta de entrega de terreno, R. de aprobacion del Ex. Tec. Prestamos de materiales y otros )

INFORMACION DEL INFORME MENSUAL EN DIGITAL (CD-ROM)

10

CONCLUSIONES y RECOMENDACIONES

11

DE LA PRESENTACIÓN DEL INFORME SERA FOLIADO EN FORMA ASCENDENTE DESDE LA ULTIMA HOJA FIRMADOS POR EL RESIDENTE Y SUPERVISOR DENTRO DEL PLAZO PROGRAMADO

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

RESUM OBRA ENTIDAD EJECUTORA MODALIDAD DE EJECUCION SUPERVISOR DE OBRA RESIDENTE DE OBRA INFORME PRESUPUESTO (S/.) ITEM

PARTIDAS

UNIDAD

AVANCE ACUMULADO METRADO ANTERIOR

TRAMO II 01

OBRAS PROVISIONALES

01.01

CARTEL DE OBRA

und

1.00

1.00

01.02

ALMACEN Y CASETA DE GUARDIANIA

m2

24.00

-

02 02.01 02.01.01 02.02

-

OBRAS PRELIMINARES

-

ELEMENTOS DE SEGURIDAD SEGURIDAD DURANTE LA CONSTRUCCION

GLB

0.50

0.50 -

TRAZO, NIVELACION Y REPLANTEO

02.02.01

TRAZO Y REPLANTEO INICIAL

KM

13.14

12.50

02.02.02

TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

m2

106,244.83

99,550.00

02.03

-

MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO

02.03.01

MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO

GLB

0.50

0.49

02.03.02

MOVILIZACION Y DESMOVILIZACION DE PLANTA DE AS

GLB

0.50

-

02.03.03

MONTAJE Y DESMONTAJE DE PLANTA DE ASFALTO

GLB

0.50

-

02.03.04

MOVILIZACION Y DESMOVILIZACION DE PLANTA CHAN

GLB

0.50

-

02.03.05

MONTAJE Y DESMONTAJE DE PLANTA CHANCADORA

GLB

0.50

-

02.04

-

ACONDICIONAMIENTO DE ACCESOS A CANTERAS

02.04.01

ACONDICIONAMIENTO DE ACCESO A CANTERA

KM

8.25

4.90

02.04.02

ACONDICIONAMIENTO DE ACCESO A FUENTE DE AGUA

KM

2.00

1.60

02.04.03

DESVIOS PROVISIONALES

KM

2.50

1.80

02.05 02.05.01 03 03.01

-

LIMPIEZA DE VIA LIMPIEZA INICIAL DE TERRENO

m2

105,120.00

104,850.00 -

PAVIMENTO

-

SUB RASANTE

03.01.01

ESCARIFICADO DE CAPA DE RODADURA EXISTENTE

m2

38,384.83

38,384.83

03.01.02

MATERIAL DE PRESTAMO CANTERA CHOCCOPAMPA

m3

1,478.25

1,448.40

03.01.03

CONFORMACION DE SUB RASANTE

m2

38,233.76

35,755.00

03.02 03.02.01

-

SUB BASE MATERIAL SELECCIONADO (CANTERA TAHUACO)

m3

22,532.75

16,139.00

V

S

D

1

2

3

03.02.02 03.03

CONFORMACION DE SUB BASE

m2

75,414.83

75,414.83 -

BASE

03.03.01

MATERIAL SELECCIONADO (CANTERA TAHUACO)

m3

10,624.48

5,075.00

03.03.02

MATERIAL CHANCADO

m3

10,512.80

826.20

03.03.03

CONFORMACION DE BASE E=0.20 M

m2

106,244.83

10,560.00

03.04

-

PAVIMENTO FLEXIBLE

9,525.00

03.04.01

IMPRIMACION

m2

99,674.83

03.04.02

LIMPIEZA DE SUPERFICIE IMPRIMADA

m2

86,534.83

-

03.04.03

PREPARACION DE MEZCLA ASFALTICA E=2"

m2

86,534.83

-

03.04.04

TRANSPORTE DE MEZCLA ASFALTICA

m3

4,395.97

-

03.04.05

ESPARCIDO Y COMPACTADO

m2

86,534.83

-

04 04.01 05 05.01 05.01.01 05.02

-

PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD EN PA

GLB

0.50

-

MITIGACION DE IMPACTO AMBIENTAL

-

ETAPA PRELIMINAR CAPACITACION Y SENSIBILIZACION A LA POBLACION

0.50

GLB

3.00

2.30 -

ETAPA DE CONSTRUCCION

05.02.01

RIEGO DE VIAS DE ACCESO A CANTERAS

m3

549.79

470.00

05.02.02

HABILITACION DE LETRINAS (INCLUYE INSTALACION)

und

3.00

3.00

05.02.03

HABILITACION DE BASUREROS

GLB

8.00

8.00

05.03

-

ETAPA DE ABANDONO

05.03.01

REACONDICIONAMIENTO DE AREA OCUPADA POR CA

HA

6.00

-

05.03.02

RECONFORMACION DE CANTERA

HA

4.00

-

05.03.03

RECONFORMACION DE BOTADERO

HA

4.00

-

06 06.01 07

-

FLETE TERRESTRE FLETE TRANSPORTE LOCAL

GLB

1.00

-

VARIOS, LIMPIEZA

07.01

PAGO POR EXTRACCION DE MATERIAL DE CANTERA

m3

58,936.78

07.02

LIMPIEZA FINAL DE OBRA

m2

106,244.83

08 08.01 08.01.01 08.02 08.02.01 08.03

-

OBRAS PRELIMINARES m2

59.00

59.00 -

MOVIMIENTO DE TIERRAS RELLENO COMPACTADO CON MATERIAL SELECCIONA

6,540.00 -

CONSTRUCCION DE PONTON 6.25 TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

0.95

m3

144.00

-

OBRAS DE CONCRETO ARMADO

08.03.01

MUROS: CONCRETO F'C=210 KG/CM2

m3

21.66

21.66

08.03.02

MUROS: ENCOFRADO Y DESENCOFRADO

m2

53.98

53.98

08.03.03

MUROS: ACERO DE REFUERZO

kg

327.57

327.57

08.03.04

LOSA MACIZA: CONCRETO F'C=280 KG/CM2

m3

13.69

13.69

08.03.05

LOSA MACIZA: ENCOF Y DESENCOF

m2

28.04

28.04

08.03.06

LOSA MACIZA: ACERO DE REFUERZO

kg

1,321.42

1,321.42

08.03.07

LOSA DE APROXIMACION: CONCRETO F'C= 210 KG/CM2

m3

12.54

-

08.03.08

LOSA DE APROXIMACION: ENCOFRADO Y DESENCOFR

m2

6.58

-

08.03.09

LOSA DE APROXIMACION: ACERO DE REFUERZO

kg

252.88

-

08.03.10

LOSA DE APROXIMACION: JUNTA ASFALTICA

m

32.90

-

08.04

-

OBRAS COMPLEMENTARIAS

08.04.01

TARRAJEO EN SARDINEL

m2

9.00

9.00

08.04.02

BARANDAS DE PROTECCION

m

12.00

12.00

08.04.03

PINTURA EN BARANDAS METALICAS

m2

12.00

-

08.04.04

PINTURA EN SARDINELES

m

9.45

-

08.05 08.05.01 09

-

PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD

GLB

1.00

0.05 -

CONSTRUCCION DE ALCANTARILLA TIPO TMC

09.01

EXCAVACION EN FORMA MANUAL PARA ESTRUCTURAS

m3

23.71

-

09.02

ALCANTARILLAS TMC D=24"

m

9.50

-

09.03

RELLENO DE ESTRUCTURAS CON MATERIAL DE PREST

m3

21.91

-

09.04

ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

8.66

-

09.05

CONCRETO CICLOPEO F'c=140 Kg/Cm2 + 30 % P.G. EN

m3

1.19

-

09.06

CONCRETO 175 KG/CM2 EN MURO Y ALERO

m3

1.89

-

10 10.01 10.01.01 10.02

-

ENCAUZAMIENTO DE CURSOS DE AGUA

-

OBRAS PRELIMINARES TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

m2

15.00

-

MOVIMIENTO DE TIERRAS

10.02.01

EXCAVACION EN FORMA MANUAL

m3

3.00

10.02.02

EXCAVACION C/MAQ EN TERRENO SATURADO

m3

300.00

10.03

2.88 -

OBRAS DE CONCRETO SIMPLE

10.03.01

MURO: CONCRETO CICLOPEO 1:10 + 30% PG

m3

37.50

-

10.03.02

MUROS: ENCOFRADO Y DESENCOFRADO

m2

120.00

-

11 11.01 11.01.01 11.02

-

CONSTRUCCION DE CUNETAS

-

OBRAS PRELIMINARES TRAZO Y REPLANTEO INICIAL

m

27,280.00

13,647.75 -

MOVIMIENTO DE TIERRAS

11.02.01

EXCAVACION EN FORMA MANUAL

m3

3,410.00

1,341.56

11.02.02

PERFILADO Y COMPACTADO EN CUNETAS

m2

19,096.00

2,338.00

11.03

-

OBRAS DE CONCRETO SIMPLE

11.03.01

ENCOFRADO Y DESENCOFRADO EN CUNETAS

m2

8,190.00

1,008.00

11.03.02

CUNETA: CONCRETO f¨c=140 kg/cm2

m3

1,443.40

66.68

11.03.03

JUNTA ASFALTICA EN CUNETAS

m

8,190.00

11.04

-

LOSA PEATONAL

11.04.01

LOSA DE CONCRETO DE 0.15 M F'C 145 KG/CM2

m3

1.82

-

11.04.02

LOSA MACIZA: ACERO DE REFUERZO

kg

18.63

-

11.04.03

LOSA DE CONCRETO DE 0.15 M ENCOFRADO Y DESE

m2

93.82

-

12 12.01 12.01.01 13

-

OBRAS PROVISIONALES

-

TRAZO DE EJES EN PAVIMENTO TRAZO Y REPLANTEO EN PAVIMENTO

m

39,420.00

-

SEÑALIZACION

13.01

SEÑALES REGLAMENTARIAS

und

4.00

-

13.02

SEÑALES PREVENTIVAS

und

2.00

-

13.03

SEÑALES INFORMATIVAS

und

2.00

-

13.04

TERMINAL DE AMORTIGUACION EN GUARDAVIAS

und

2.00

-

13.05

GUARDAVIAS DE FIERRO GALVANIZADO

MOD

24.00

-

13.06

HITOS KILOMETRICOS

und

13.00

-

13.07

MARCAS EN EL PAVIMENTO CON MICROESFERAS

m2

3,245.58

-

FORMATO RO - 08 RESUMEN DE METRADOS REALES DIARIOS ACUMULADO

JULIO L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

S

D

L

M

M

J

V

S

D

23

24

25

26

27

28

29

30

31

AVANCE ACTUAL MENSUAL

AVANCE ACUMULADO ACTUAL

-

1.00

-

-

-

-

-

0.50

-

-

-

12.50 99,550.00

-

-

-

0.49 -

-

-

-

-

-

-

-

4.90

-

1.60

-

1.80

-

-

-

104,850.00 -

-

38,384.83

-

1,448.40 35,755.00

-

16,139.00

-

75,414.83 -

-

5,075.00

-

826.20

-

10,560.00

-

9,525.00

-

-

-

-

-

-

-

0.50

-

-

-

2.30 -

-

470.00

-

3.00

-

8.00 -

-

-

-

-

-

0.95

-

-

-

6,540.00 -

-

-

-

-

-

59.00 -

-

21.66

-

53.98 327.57

-

13.69

-

28.04 1,321.42

-

-

-

-

-

-

-

-

-

-

-

9.00

-

12.00

-

-

-

-

-

0.05

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2.88 -

-

-

-

-

-

-

-

13,647.75 1,341.56 2,338.00 1,008.00 66.68

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS

HOJA DE METRADOS MES DE MARZO (RESPECTO AL PRESUPUESTO BASE) PROYECTO: MEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

UBICACIÓN: COPANI-ZEPITA; COPANI-ZEPITA; YUNGUYO-CHUCUITO JULI; PUNO

SUPERVISOR:

ING. WILBER MAMANI APAZA

FECHA:

Partida N°

3.00 3.03 03.03.01

FEBRERO - 2012

Especificaciones

Und.

TRAMO II PAVIMENTO BASE MATERIAL SELECCIONADO

N° de MEDIDAS Parcial veces Largo Ancho Altura

m3

576.00 576.00

-

11 11.01 11.01.01

11.02 11.02.01

11.02.02

11.03 11.03.01

11.03.02

CONSTRUCCION DE CUNETAS OBRAS PRELIMINARES TRAZO Y REPLANTEO INICIAL Progresiva 18+420 - 19+060 Lado Derecho Progresiva 19+140 - 19+240 Lado Derecho MOVIMIENTO DE TIERRAS EXCAVACION EN FORMA MANUAL Progresiva 19+170 - 19+320 Lado Derecho Progresiva 18+420 - 18+470 Lado Izquierdo

m 740.00

740.00

m3

50.00 AREA

0.25

1

200.00

1

835.00

0.86

1

835.00

0.58

1

795.00

0.86

1

795.00

0.58

134

3.00

50.00

m2

OBRAS DE CONCRETO SIMPLE ENCOFRADO Y DESENCOFRADO EN CUNETAS Progresiva 18+786 - 19+228 Lado Derecho

1202.40 718.10 484.30

m2

CUNETA: CONCRETO f¨c=140 kg/cm2 Progresiva 18+786 - 19+228 Lado Derecho

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

740.00 1

PERFILADO Y COMPACTADO EN CUNETAS Progresiva 18+786 - 19+310 Lado Derecho

1144.80 683.70 461.10

m3

03/19/2020

Total

70.35 AREA

0.18

70.35

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS

HOJA DE METRADOS MES DE MARZO (POR MAYORES METRADOS) PROYECTO: MEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

UBICACIÓN: COPANI-ZEPITA; COPANI-ZEPITA; YUNGUYO-CHUCUITO JULI; PUNO

SUPERVISOR:

ING. WILBER MAMANI APAZA

FECHA:

FEBRERO - 2012

Especificaciones

Partida N° 01 01.03 01.03.02.03

Und.

N° de MEDIDAS Parcial veces Largo Ancho Altura

Total

OBRAS ADICIONALES POR MAYORES METRADOS CONSTRUCCION DE PONTON L=4.65 LOSA MACIZA: CONCRETO F'C=280 KG/CM2

m3

0.00

m2

0.00

kg

0.00

m2

0.00

LOSA VEREDA

VIGA

01.03.02.04

LOSA MACIZA: ENCOF Y DESENCOF

Plataforma Laterales Laterales 01.03.02.05

LOSA MACIZA: ACERO DE REFUERZO

Ver hoja de metrados de acero 01.03.03 01.03.03.01

OBRAS COMPLEMENTARIAS TARRAJEO EN SARDINEL

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS

HOJA DE METRADOS MES DE MARZO (POR PARTIDAS NUEVAS) PROYECTO: MEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

UBICACIÓN: COPANI-ZEPITA; COPANI-ZEPITA; YUNGUYO-CHUCUITO JULI; PUNO

SUPERVISOR:

ING. WILBER MAMANI APAZA

FECHA:

Partida N° 02 02.02 02.02.02

FEBRERO - 2012

Especificaciones

Und.

N° de

MEDIDAS

veces Largo

Ancho Altura

Parcial

Total

OBRAS ADICIONALES POR PARTIDAS NUEVAS CONSTRUCCION DE PONTON L=4.65 MOVIMIENTO DE TIERRAS

02.02.02.02

ACARREO DE MATERIAL EXCEDENTE

m3

02.02.02.03

CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE

m3

0

0 0 0

02.02.04 02.02.04.04

OBRAS DE CONCRETO ARMADO MUROS CONCRETO F'C 280 KG/CM2

0

m3

0

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

VALORIZACION MENSUAL DE OBRA MES DE MARZO (RESPECTO AL PRESUPUESTO BASE) OBRA: META: UNIDAD EJECUTORA : COMPONENTE : FUENTE DE FINANCIAMIENTO: UBICACIÓN: COPANI-ZEPITA DISTR.: COPANI-ZEPITA MODALIDAD DE EJECUCIÓN: Item

Descripcion Partida

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL 8 001 SEDE PUNO VALORIZACION N° : MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA ING. RESIDENTE: ING. MARCO ANTONIO ALIAGA ARPASI DONACIONES Y TRANSFERENCIAS ING. SUPERVISOR: ING. WILBER MAMANI APAZA PROV.: YUNGUYO - CHUCUITO JULI REGION: PUNO FECHA DE INICIO: 23-09-2011 FECHA DE TERMINO: ADMINISTRACION DIRECTA PLAZO DE EJECUCION: 90 DIAS CALENDARIOS Und

Metrado

PRESUPUESTO Precio Parcial Unit.

Valorización Anterior

% de

Valorización Actual

% de

Acumulado

% de

Saldo por Ejecutar % Saldo

Metrado

Valorizado

Avance

Metrado

Valorizado

Avance

Metrado

Valorizado

Avance

Metrado

Valorizado

TRAMO II 01

OBRAS PROVISIONALES

01.01

CARTEL DE OBRA

und

1.00

1,293.69

1293.69

1.00

01.02

ALMACEN Y CASETA DE GUARDIANIA

m2

24.00

189.72

4553.28

-

02 02.01 02.01.01 02.02

1,293.69 -

100.00%

-

-

0.00%

1.00

0.00%

-

-

0.00%

-

-

0.00%

0.50

OBRAS PRELIMINARES

1,293.69 -

100.00% 0.00%

24.00

4,553.28

0.00% 100.00%

-

ELEMENTOS DE SEGURIDAD SEGURIDAD DURANTE LA CONSTRUCCION

GLB

0.50

13,712.30

6856.15

0.50

6,856.15

100.00%

TRAZO, NIVELACION Y REPLANTEO

-

6,856.15

100.00%

-

-

0.00%

-

02.02.01

TRAZO Y REPLANTEO INICIAL

KM

13.14

138.79

1823.70

12.50

1,734.88

95.13%

-

-

0.00%

12.50

1,734.88

95.13%

0.64

88.83

4.87%

02.02.02

TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

m2

106,244.83

0.12

12749.38

99,550.00

11,946.00

93.70%

-

-

0.00%

99,550.00

11,946.00

93.70%

6,694.83

803.38

6.30%

9,800.00

02.03

MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO

-

02.03.01

MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO

GLB

0.50

20,000.00

10000.00

0.49

98.00%

-

-

0.00%

0.49

98.00%

0.01

200.00

2.00%

02.03.02

MOVILIZACION Y DESMOVILIZACION DE PLANTA DE ASFALTO

GLB

0.50

12,000.00

6000.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.50

6,000.00

100.00%

02.03.03

MONTAJE Y DESMONTAJE DE PLANTA DE ASFALTO

GLB

0.50

5,000.00

2500.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.50

2,500.00

100.00%

02.03.04

MOVILIZACION Y DESMOVILIZACION DE PLANTA CHANCADORA

GLB

0.50

10,000.00

5000.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.50

5,000.00

100.00%

02.03.05

MONTAJE Y DESMONTAJE DE PLANTA CHANCADORA

GLB

0.50

3,000.00

1500.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

0.50

1,500.00

100.00%

2.04

9,800.00

ACONDICIONAMIENTO DE ACCESOS A CANTERAS

-

02.04.01

ACONDICIONAMIENTO DE ACCESO A CANTERA

KM

8.25

1,441.61

11893.28

4.90

7,063.89

59.39%

-

-

0.00%

4.90

7,063.89

59.39%

3.35

4,829.39

40.61%

02.04.02

ACONDICIONAMIENTO DE ACCESO A FUENTE DE AGUA

KM

2.00

1,441.61

2883.22

1.60

2,306.58

80.00%

-

-

0.00%

1.60

2,306.58

80.00%

0.40

576.64

20.00%

02.04.03

DESVIOS PROVISIONALES

KM

2.50

1,152.74

2881.85

1.80

2,074.93

72.00%

-

-

0.00%

1.80

2,074.93

72.00%

0.70

806.92

28.00%

99.74%

-

-

0.00%

104,850.00

6,291.00

99.74%

270.00

16.20

0.26%

02.05 02.05.01 03 03.01

LIMPIEZA DE VIA LIMPIEZA INICIAL DE TERRENO

m2

105,120.00

0.06

6307.20

104,850.00

6,291.00

PAVIMENTO

-

SUB RASANTE

-

03.01.01

ESCARIFICADO DE CAPA DE RODADURA EXISTENTE

m2

38,384.83

0.29

11131.60

38,384.83

11,131.60

100.00%

-

-

0.00%

38,384.83

11,131.60

100.00%

03.01.02

MATERIAL DE PRESTAMO CANTERA CHOCCOPAMPA

m3

1,478.25

19.15

28308.49

1,448.40

27,736.86

97.98%

-

-

0.00%

1,448.40

27,736.86

97.98%

29.85

571.63

2.02%

03.01.03

CONFORMACION DE SUB RASANTE

m2

38,233.76

2.13

81437.91

35,755.00

76,158.15

93.52%

-

-

0.00%

35,755.00

76,158.15

93.52%

2,478.76

5,279.76

6.48%

6,393.75

120,777.94

28.38%

03.02

SUB BASE

-

0.00%

-

03.02.01

MATERIAL SELECCIONADO (CANTERA CHOCOPAMPA)

m3

22,532.75

18.89

425643.65

16,139.00

304,865.71

71.62%

-

-

0.00%

16,139.00

304,865.71

71.62%

03.02.02

CONFORMACION DE SUB BASE

m2

75,414.83

1.89

142534.03

75,414.83

142,534.03

100.00%

-

-

0.00%

75,414.83

142,534.03

100.00%

03.03

-

BASE

-

-

0.00%

-

03.03.01

MATERIAL SELECCIONADO (CANTERA CHOCOPAMPA)

m3

10,624.48

18.89

200696.43

5,075.00

95,866.75

47.77%

-

-

0.00%

5,075.00

95,866.75

47.77%

5,549.48

104,829.68

52.23%

03.03.02

MATERIAL CHANCADO

m3

10,512.80

97.49

1024892.87

826.20

80,546.24

7.86%

-

-

0.00%

826.20

80,546.24

7.86%

9,686.60

944,346.63

92.14%

03.03.03

CONFORMACION DE BASE E=0.20 M

m2

106,244.83

2.17

230551.28

10,560.00

22,915.20

9.94%

-

-

0.00%

10,560.00

22,915.20

9.94%

95,684.83

207,636.08

90.06%

9,525.00

38,481.00

03.04

PAVIMENTO FLEXIBLE

-

03.04.01

IMPRIMACION

m2

99,674.83

4.04

402686.31

9.56%

-

-

0.00%

9.56%

90,149.83

364,205.31

90.44%

03.04.02

LIMPIEZA DE SUPERFICIE IMPRIMADA

m2

86,534.83

0.34

29421.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

86,534.83

29,421.84

100.00%

03.04.03

PREPARACION DE MEZCLA ASFALTICA E=2"

m2

86,534.83

50.16

4340587.07

-

-

0.00%

-

-

0.00%

-

-

0.00%

86,534.83

4,340,587.07

100.00%

03.04.04

TRANSPORTE DE MEZCLA ASFALTICA

m3

4,395.97

11.15

49015.07

-

-

0.00%

-

-

0.00%

-

-

0.00%

4,395.97

49,015.07

100.00%

03.04.05

ESPARCIDO Y COMPACTADO

m2

86,534.83

1.20

103841.80

-

-

0.00%

-

-

0.00%

-

-

0.00%

86,534.83

103,841.80

100.00%

-

0.00%

0.50

04 04.01 05 05.01

9,525.00

38,481.00

PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD EN PAVIMENTO

GLB

0.50

12,926.00

6463.00

0.50

6,463.00

MITIGACION DE IMPACTO AMBIENTAL ETAPA PRELIMINAR

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

-

-

03/19/2020

100.00%

-

-

-

-

-

6,463.00

100.00%

-

-

0.00%

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

VALORIZACION MENSUAL DE OBRA MES DE MARZO (RESPECTO AL PRESUPUESTO BASE) OBRA: META: UNIDAD EJECUTORA : COMPONENTE : FUENTE DE FINANCIAMIENTO: UBICACIÓN: COPANI-ZEPITA DISTR.: COPANI-ZEPITA MODALIDAD DE EJECUCIÓN: Item 05.01.01 05.02

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL 8 001 SEDE PUNO VALORIZACION N° : MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA ING. RESIDENTE: ING. MARCO ANTONIO ALIAGA ARPASI DONACIONES Y TRANSFERENCIAS ING. SUPERVISOR: ING. WILBER MAMANI APAZA PROV.: YUNGUYO - CHUCUITO JULI REGION: PUNO FECHA DE INICIO: 23-09-2011 FECHA DE TERMINO: ADMINISTRACION DIRECTA PLAZO DE EJECUCION: 90 DIAS CALENDARIOS

Descripcion Partida CAPACITACION Y SENSIBILIZACION A LA POBLACION

Und GLB

Metrado

PRESUPUESTO Precio Parcial Unit.

3.00

5,000.00

15000.00

Valorización Anterior

% de

Valorización Actual

% de

Acumulado

% de

Saldo por Ejecutar % Saldo

Metrado

Valorizado

2.30

11,500.00

ETAPA DE CONSTRUCCION

Avance

Metrado

Valorizado

76.67%

0.10

500.00

Avance

Metrado

Valorizado

3.33%

2.40

12,000.00

Avance

Metrado

Valorizado

80.00%

0.60

3,000.00

20.00%

79.79

1,417.07

14.51%

-

05.02.01

RIEGO DE VIAS DE ACCESO A CANTERAS

m3

549.79

17.76

9764.27

470.00

8,347.20

85.49%

-

-

0.00%

470.00

8,347.20

85.49%

05.02.02

HABILITACION DE LETRINAS (INCLUYE INSTALACION)

und

3.00

600.00

1800.00

3.00

1,800.00

100.00%

-

-

0.00%

3.00

1,800.00

100.00%

-

-

0.00%

05.02.03

HABILITACION DE BASUREROS

GLB

8.00

120.00

960.00

8.00

960.00

100.00%

-

-

0.00%

8.00

960.00

100.00%

-

-

0.00%

05.03

ETAPA DE ABANDONO

-

05.03.01

REACONDICIONAMIENTO DE AREA OCUPADA POR CAMPAMENTO Y MAQUIN.

HA

6.00

628.34

3770.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

6.00

3,770.04

100.00%

05.03.02

RECONFORMACION DE CANTERA

HA

4.00

820.03

3280.12

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

3,280.12

100.00%

05.03.03

RECONFORMACION DE BOTADERO

HA

4.00

7,600.11

30400.44

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

30,400.44

100.00%

95.00%

-

-

0.00%

0.95

4,750.00

95.00%

0.05

250.00

5.00%

6,540.00

13,080.00

11.10%

52,396.78

104,793.56

88.90%

0.00%

106,244.83

40,373.04

100.00%

06 06.01 07

FLETE TERRESTRE FLETE TRANSPORTE LOCAL

GLB

1.00

5,000.00

5000.00

PAGO POR EXTRACCION DE MATERIAL DE CANTERA

m3

58,936.78

2.00

117873.56

07.02

LIMPIEZA FINAL DE OBRA

m2

106,244.83

0.38

40373.04

08.01 08.01.01 08.02 08.02.01 08.03

4,750.00

6,540.00

13,080.00 -

-

CONSTRUCCION DE PONTON 4.65

-

-

0.00%

0.00%

-

-

0.00%

100.00%

-

-

0.00%

0.00%

-

-

0.00%

-

-

m2

59.00

0.12

7.08

59.00

7.08

MOVIMIENTO DE TIERRAS RELLENO COMPACTADO CON MATERIAL SELECCIONADO EN ESTRUCTURAS

11.10%

-

OBRAS PRELIMINARES TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

-

-

07.01 08

0.95

VARIOS, LIMPIEZA

59.00

7.08

100.00%

-

-

0.00%

m3

144.00

62.56

9008.64

-

-

OBRAS DE CONCRETO ARMADO

-

-

0.00%

144.00

9,008.64

100.00%

-

08.03.01

MUROS: CONCRETO F'C=210 KG/CM2

m3

21.66

315.79

6840.01

21.66

6,840.01

100.00%

-

-

0.00%

21.66

6,840.01

100.00%

-

-

0.00%

08.03.02

MUROS: ENCOFRADO Y DESENCOFRADO

m2

53.98

39.45

2129.51

53.98

2,129.51

100.00%

-

-

0.00%

53.98

2,129.51

100.00%

-

-

0.00%

08.03.03

MUROS: ACERO DE REFUERZO

kg

327.57

5.76

1886.80

327.57

1,886.80

100.00%

-

-

0.00%

327.57

1,886.80

100.00%

-

-

0.00%

08.03.04

LOSA MACIZA: CONCRETO F'C=280 KG/CM2

m3

13.69

401.35

5494.48

13.69

5,494.48

100.00%

-

-

0.00%

13.69

5,494.48

100.00%

-

-

0.00%

08.03.05

LOSA MACIZA: ENCOF Y DESENCOF

m2

28.04

56.81

1592.95

28.04

1,592.95

100.00%

-

-

0.00%

28.04

1,592.95

100.00%

-

-

0.00%

08.03.06

LOSA MACIZA: ACERO DE REFUERZO

kg

1,321.42

5.76

7611.38

1,321.42

7,611.38

100.00%

-

-

0.00%

1,321.42

7,611.38

100.00%

-

-

08.03.07

LOSA DE APROXIMACION: CONCRETO F'C= 210 KG/CM2

m3

12.54

331.98

4163.03

-

-

0.00%

-

-

0.00%

-

-

0.00%

08.03.08

LOSA DE APROXIMACION: ENCOFRADO Y DESENCOFRADO

m2

6.58

55.78

367.03

-

-

0.00%

-

-

0.00%

-

-

0.00%

08.03.09

LOSA DE APROXIMACION: ACERO DE REFUERZO

kg

252.88

5.76

1456.59

-

-

0.00%

-

-

0.00%

-

-

0.00%

08.03.10

LOSA DE APROXIMACION: JUNTA ASFALTICA

m

32.90

4.50

148.05

-

-

0.00%

-

-

0.00%

-

-

0.00%

32.90

08.04

OBRAS COMPLEMENTARIAS

12.54

0.00%

4,163.03

100.00%

6.58

367.03

100.00%

252.88

1,456.59

100.00%

148.05

100.00%

-

08.04.01

TARRAJEO EN SARDINEL

m2

9.00

26.04

234.36

9.00

234.36

100.00%

-

-

0.00%

9.00

234.36

100.00%

-

-

08.04.02

BARANDAS DE PROTECCION

m

12.00

46.59

559.08

12.00

559.08

100.00%

-

-

0.00%

12.00

559.08

100.00%

-

-

08.04.03

PINTURA EN BARANDAS METALICAS

m2

12.00

9.67

116.04

-

-

0.00%

-

-

0.00%

-

-

0.00%

12.00

116.04

100.00%

PINTURA EN SARDINELES

m

9.45

4.67

44.13

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.45

44.13

100.00%

5.00%

-

-

0.00%

0.05

5.00%

0.95

1,040.25

95.00%

08.04.04 08.05 08.05.01 09

PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD

0.00% 0.00%

GLB

1.00

1,095.00

1095.00

0.05

54.75

CONSTRUCCION DE ALCANTARILLA TIPO TMC

54.75

-

09.01

EXCAVACION EN FORMA MANUAL PARA ESTRUCTURAS

m3

23.71

15.10

358.02

-

-

0.00%

-

-

0.00%

-

-

0.00%

23.71

358.02

100.00%

09.02

ALCANTARILLAS TMC D=24"

m

9.50

364.44

3462.18

-

-

0.00%

-

-

0.00%

-

-

0.00%

9.50

3,462.18

100.00%

09.03

RELLENO DE ESTRUCTURAS CON MATERIAL DE PRESTAMO

m3

21.91

46.33

1015.09

-

-

0.00%

-

-

0.00%

-

-

0.00%

21.91

1,015.09

100.00%

09.04

ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

8.66

44.33

383.90

-

-

0.00%

-

-

0.00%

-

-

0.00%

8.66

383.90

100.00%

09.05

CONCRETO CICLOPEO F'c=140 Kg/Cm2 + 30 % P.G. EN CIMENTACIONES

m3

1.19

260.60

310.11

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.19

310.11

100.00%

09.06

CONCRETO 175 KG/CM2 EN MURO Y ALERO

m3

1.89

289.14

546.47

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.89

546.47

100.00%

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

VALORIZACION MENSUAL DE OBRA MES DE MARZO (RESPECTO AL PRESUPUESTO BASE) OBRA: META: UNIDAD EJECUTORA : COMPONENTE : FUENTE DE FINANCIAMIENTO: UBICACIÓN: COPANI-ZEPITA DISTR.: COPANI-ZEPITA MODALIDAD DE EJECUCIÓN: Item 10 10.01 10.01.01 10.02

Descripcion Partida

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL 8 001 SEDE PUNO VALORIZACION N° : MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA ING. RESIDENTE: ING. MARCO ANTONIO ALIAGA ARPASI DONACIONES Y TRANSFERENCIAS ING. SUPERVISOR: ING. WILBER MAMANI APAZA PROV.: YUNGUYO - CHUCUITO JULI REGION: PUNO FECHA DE INICIO: 23-09-2011 FECHA DE TERMINO: ADMINISTRACION DIRECTA PLAZO DE EJECUCION: 90 DIAS CALENDARIOS Und

Metrado

PRESUPUESTO Precio Parcial Unit.

Valorización Anterior Valorizado

ENCAUZAMIENTO DE CURSOS DE AGUA

Avance

Valorización Actual Metrado

% de

Valorizado

Avance

Acumulado Metrado

% de

Valorizado

Avance

Saldo por Ejecutar Metrado

Valorizado

-

OBRAS PRELIMINARES

-

TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

m2

15.00

0.12

1.80

-

-

MOVIMIENTO DE TIERRAS

0.00%

-

-

0.00%

-

96.00%

-

-

0.00%

2.88

96.00%

0.12

1.81

4.00%

0.00%

-

-

0.00%

-

-

0.00%

300.00

5,652.00

100.00%

-

0.00%

15.00

1.80

100.00%

-

10.02.01

EXCAVACION EN FORMA MANUAL

m3

3.00

15.11

45.33

10.02.02

EXCAVACION C/MAQ EN TERRENO SATURADO

m3

300.00

18.84

5652.00

-

10.03

% de

% Saldo Metrado

2.88

43.52 -

OBRAS DE CONCRETO SIMPLE

43.52

-

10.03.01

MURO: CONCRETO CICLOPEO 1:10 + 30% PG

m3

37.50

134.45

5041.88

-

-

0.00%

-

-

0.00%

-

-

0.00%

37.50

5,041.88

100.00%

10.03.02

MUROS: ENCOFRADO Y DESENCOFRADO

m2

120.00

39.45

4734.00

-

-

0.00%

-

-

0.00%

-

-

0.00%

120.00

4,734.00

100.00%

50.03%

740.00

12,892.25

3,738.75

47.26%

11 11.01 11.01.01 11.02

CONSTRUCCION DE CUNETAS

-

OBRAS PRELIMINARES

-

TRAZO Y REPLANTEO INICIAL

m

27,280.00

0.29

7911.20

13,647.75

3,957.85

MOVIMIENTO DE TIERRAS

214.60

2.71%

14,387.75

4,172.45

52.74%

-

11.02.01

EXCAVACION EN FORMA MANUAL

m3

3,410.00

15.10

51491.00

1,341.56

20,257.56

39.34%

50.00

755.00

1.47%

1,391.56

21,012.56

40.81%

2,018.44

30,478.44

59.19%

11.02.02

PERFILADO Y COMPACTADO EN CUNETAS

m2

19,096.00

1.08

20623.68

2,338.00

2,525.04

12.24%

1,202.40

1,298.59

6.30%

3,540.40

3,823.63

18.54%

15,555.60

16,800.05

81.46% 73.71%

11.03

OBRAS DE CONCRETO SIMPLE

-

11.03.01

ENCOFRADO Y DESENCOFRADO EN CUNETAS

m2

8,190.00

50.12

410482.80

1,008.00

50,520.96

12.31%

1,144.80

57,377.38

13.98%

2,152.80

107,898.34

26.29%

6,037.20

302,584.46

11.03.02

CUNETA: CONCRETO f¨c=140 kg/cm2

m3

1,443.40

218.49

315368.47

66.68

14,567.82

4.62%

70.35

15,370.77

4.87%

137.03

29,938.59

9.49%

1,306.38

285,429.87

90.51%

11.03.03

JUNTA ASFALTICA EN CUNETAS

m

8,190.00

3.29

26945.10

-

0.00%

-

-

0.00%

-

-

0.00%

8,190.00

26,945.10

100.00%

11.04

-

LOSA PEATONAL

-

11.04.01

LOSA DE CONCRETO DE 0.15 M F'C 145 KG/CM2

m3

1.82

229.07

416.91

-

-

0.00%

-

-

0.00%

-

-

0.00%

1.82

416.91

100.00%

11.04.02

LOSA MACIZA: ACERO DE REFUERZO

kg

18.63

5.76

107.31

-

-

0.00%

-

-

0.00%

-

-

0.00%

18.63

107.31

100.00%

11.04.03

LOSA DE CONCRETO DE 0.15 M ENCOFRADO Y DESENCOFRADO

m2

93.82

56.19

5271.75

-

-

0.00%

-

-

0.00%

-

-

0.00%

93.82

5,271.75

100.00%

0.00%

-

-

0.00%

-

-

0.00%

39,420.00

11,431.80

100.00%

12 12.01 12.01.01 13

OBRAS PROVISIONALES

-

TRAZO DE EJES EN PAVIMENTO

-

TRAZO Y REPLANTEO EN PAVIMENTO

m

39,420.00

0.29

11431.80

-

-

SEÑALIZACION

-

13.01

SEÑALES REGLAMENTARIAS

und

4.00

864.71

3458.84

-

-

0.00%

-

-

0.00%

-

-

0.00%

4.00

3,458.84

100.00%

13.02

SEÑALES PREVENTIVAS

und

2.00

788.58

1577.16

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

1,577.16

100.00%

13.03

SEÑALES INFORMATIVAS

und

2.00

1,270.74

2541.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

2,541.48

100.00%

13.04

TERMINAL DE AMORTIGUACION EN GUARDAVIAS

und

2.00

137.33

274.66

-

-

0.00%

-

-

0.00%

-

-

0.00%

2.00

274.66

100.00%

13.05

GUARDAVIAS DE FIERRO GALVANIZADO

MOD

24.00

810.02

19440.48

-

-

0.00%

-

-

0.00%

-

-

0.00%

24.00

19,440.48

100.00%

13.06

HITOS KILOMETRICOS

und

13.00

109.23

1419.99

-

-

0.00%

-

-

0.00%

-

-

0.00%

13.00

1,419.99

100.00%

13.07

MARCAS EN EL PAVIMENTO CON MICROESFERAS

m2

3,245.58

8.29

26905.86

-

-

0.00%

-

-

0.00%

-

-

0.00%

3,245.58

26,905.86

100.00%

7,261,345.65

86.95%

7,261,345.65 85.41% 86.95% -1.54%

82.27%

PRESUPUESTO TOTAL COSTO DIRECTO GASTOS GENERALES (3.50 %) GASTOS DE SUPERVISION (0.90 %) GASTOS DE LIQUIDACION (0.18 %) EXP. TECNICO ( %) TOTAL PRESUPUESTO PORCENTAJE PROGRAMADO % PORCENTAJE EJECUTADO % SALDO NO EJECUTADO %

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

S/.

-

8351647.97

1,014,786.00

304202.46

30,572.35

1,095.13

123794.26 24619.03

12,441.31 2,474.21

445.66 88.63

21951.92 8826215.64

2,206.17 1,062,480.04 14.59% 12.16% 2.43%

03/19/2020

12.15%

12.04%

75,516.34

79.03 77,224.78 3.52% 0.90% 2.62%

0.90%

1,090,302.34

0.87%

1,090,302.34 14.59% 13.05% 1.54%

13.05%

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

VALORIZACION MENSUAL DE OBRA MES DE MARZO (POR MAYORES METRADOS) OBRA: META: UNIDAD EJECUTORA : COMPONENTE : FUENTE DE FINANCIAMIENTO: UBICACIÓN: COPANI-ZEPITA DISTR.: COPANI-ZEPITA MODALIDAD DE EJECUCIÓN: ITEM

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA 00002 CONCLUSION MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA TRAMO II COPANI ZEPITA KM 18+000 AL KM 31+140 8 001 SEDE PUNO VALORIZACION N° : MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA ING. RESIDENTE: ING. MARCO ANTONIO ALIAGA ARPASI DONACIONES Y TRANSFERENCIAS ING. SUPERVISOR: ING. WILBER MAMANI APAZA PROV.: YUNGUYO - CHUCUITO JULI REGION: PUNO FECHA DE INICIO: FECHA DE TERMINO: 23-09-2011 12/21/2011 ADMINISTRACION DIRECTA PLAZO DE EJECUCION: 90 DIAS CALENDARIOS

DESCRIPCION

PRESUPUESTO

UND METRADO

01 01.01 01.01.01 01.01.01.01 01.01.02 01.01.02.01 01.01.03

P.U.

ANTERIOR COSTO

METRADO

COSTO

ACTUAL %

METRADO

ACUMULADO

COSTO

%

METRADO

COSTO

%

OBRAS ADICIONALES POR MAYORES METRADOS OBRAS PRELIMINARES ELEMENTOS DE SEGURIDAD SEGURIDAD DURANTE LA CONSTRUCCION

0.50

13,712.30

6856.15

0.50

6,856.15

100.00%

-

-

0.00%

0.50

6,856.15

100.00%

m2

42,900.00

0.78

33462.00

42,900.00

33,462.00

100.00%

-

-

0.00%

42,900.00

33,462.00

100.00%

GLB

TRAZO, NIVELACION Y REPLANTEO TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION ACONDICIONAMIENTO DE ACCESOS A CANTERAS

01.01.03.01

ACONDICIONAMIENTO DE ACCESO A CANTERA

KM

5.20

1,441.61

7496.37

5.20

7,496.37

100.00%

-

-

0.00%

5.20

7,496.37

100.00%

01.01.03.02

ACONDICIONAMIENTO DE ACCESO A FUENTE DE AGUA

KM

3.50

1,441.61

5045.64

3.50

5,045.64

100.00%

-

-

0.00%

3.50

5,045.64

100.00%

m2

6,606.62

0.29

1915.92

6,606.62

1,915.92

100.00%

-

-

0.00%

6,606.62

1,915.92

100.00%

m2

37,400.00

1.89

70686.00

37,400.00

70,686.00

100.00%

-

-

0.00%

37,400.00

70,686.00

100.00%

m3

44.00

62.56

2752.64

44.00

2,752.64

100.00%

-

-

0.00%

44.00

2,752.64

100.00%

01.02 01.02.01 01.02.01.01 01.02.02 01.02.02.01 01.03 01.03.01 01.03.01.01 01.03.02

PAVIMENTO SUB RASANTE ESCARIFICADO DE CAPA DE RODADURA EXISTENTE SUB BASE CONFORMACION DE SUB BASE CONSTRUCCION DE PONTON L=4.65 MOVIMIENTO DE TIERRAS RELLENO COMPACTADO CON MATERIAL SELECCIONADO EN ESTRUCTURAS OBRAS DE CONCRETO ARMADO 129.62

39.45

5113.51

129.62

5,113.51

100.00%

-

-

0.00%

129.62

5,113.51

100.00%

6,070.66

5.76

34967.00

6,070.66

34,967.00

100.00%

-

-

0.00%

6,070.66

34,967.00

100.00%

m3

7.35

401.35

2949.92

7.35

2,949.92

100.00%

-

-

0.00%

7.35

2,949.92

100.00%

LOSA MACIZA: ENCOF Y DESENCOF

m2

38.06

56.81

2162.19

38.06

2,162.19

100.00%

-

-

0.00%

38.06

2,162.19

100.00%

LOSA MACIZA: ACERO DE REFUERZO

kg

1,775.65

5.76

10227.74

1,775.65

10,227.74

100.00%

-

-

0.00%

1,775.65

10,227.74

100.00%

m2

5.40

26.04

140.62

5.40

140.62

100.00%

-

-

0.00%

5.40

140.62

100.00%

01.03.02.01

MUROS: ENCOFRADO Y DESENCOFRADO

m2

01.03.02.02

MUROS: ACERO DE REFUERZO

kg

01.03.02.03

LOSA MACIZA: CONCRETO F'C=280 KG/CM2

01.03.02.04 01.03.02.05 01.03.03 01.03.03.01 01.04

OBRAS COMPLEMENTARIAS TARRAJEO EN SARDINEL CONSTRUCCION DE ALCANTARILLA TIPO TMC (01 UND.)

01.04.01

EXCAVACION EN FORMA MANUAL PARA ESTRUCTURAS

m3

23.71

15.10

358.02

23.71

358.02

100.00%

-

-

0.00%

23.71

358.02

100.00%

01.04.02

ALCANTARILLAS TMC D=24"

m

10.50

364.06

3822.63

10.50

3,822.63

100.00%

-

-

0.00%

10.50

3,822.63

100.00%

01.04.03

RELLENO DE ESTRUCTURAS CON MATERIAL DE PRESTAMO

m3

21.91

46.33

1015.09

21.91

1,015.09

100.00%

-

-

0.00%

21.91

1,015.09

100.00%

01.04.04

ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

8.66

44.33

383.90

8.66

383.90

100.00%

-

-

0.00%

8.66

383.90

100.00%

01.04.05

CONCRETO CICLOPEO F'c=140 Kg/Cm2 + 30 % P.G. EN CIMENTACIONES

m3

1.19

257.25

306.13

1.19

306.13

100.00%

-

-

0.00%

1.19

306.13

100.00%

01.04.06

CONCRETO 175 KG/CM2 EN MURO Y ALERO

m3

1.89

289.14

546.47

1.89

546.47

100.00%

-

-

0.00%

1.89

546.47

100.00%

01.05 01.05.01

CONSTRUCCION DE CUNETAS OBRAS PRELIMINARES

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

VALORIZACION MENSUAL DE OBRA MES DE MARZO (POR MAYORES METRADOS) OBRA: META: UNIDAD EJECUTORA : COMPONENTE : FUENTE DE FINANCIAMIENTO: UBICACIÓN: COPANI-ZEPITA DISTR.: COPANI-ZEPITA MODALIDAD DE EJECUCIÓN: ITEM

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA 00002 CONCLUSION MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA TRAMO II COPANI ZEPITA KM 18+000 AL KM 31+140 8 001 SEDE PUNO VALORIZACION N° : MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA ING. RESIDENTE: ING. MARCO ANTONIO ALIAGA ARPASI DONACIONES Y TRANSFERENCIAS ING. SUPERVISOR: ING. WILBER MAMANI APAZA PROV.: YUNGUYO - CHUCUITO JULI REGION: PUNO FECHA DE INICIO: FECHA DE TERMINO: 23-09-2011 12/21/2011 ADMINISTRACION DIRECTA PLAZO DE EJECUCION: 90 DIAS CALENDARIOS

DESCRIPCION

PRESUPUESTO

UND METRADO

01.05.01.01 01.05.02

TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

P.U.

ANTERIOR COSTO

METRADO

COSTO

ACTUAL %

METRADO

ACUMULADO

COSTO

%

METRADO

COSTO

%

m2

10,720.00

0.78

8361.60

10,720.00

8,361.60

100.00%

-

-

0.00%

10,720.00

8,361.60

100.00%

MOVIMIENTO DE TIERRAS

01.05.02.01

EXCAVACION EN FORMA MANUAL

m3

1,340.00

15.10

20234.00

1,340.00

20,234.00

100.00%

-

-

0.00%

1,340.00

20,234.00

100.00%

01.05.02.02

PERFILADO Y COMPACTADO EN CUNETAS

m2

7,504.00

1.08

8104.32

7,504.00

8,104.32

100.00%

-

-

0.00%

7,504.00

8,104.32

100.00%

01.05.03

OBRAS DE CONCRETO SIMPLE

01.05.03.01

ENCOFRADO CON SERCHAS PARA CUNETAS

m2

804.00

50.12

40296.48

804.00

40,296.48

100.00%

-

-

0.00%

804.00

40,296.48

100.00%

01.05.03.02

CUNETA: CONCRETO f¨c=140 kg/cm2

m3

750.40

218.49

163954.90

750.40

163,954.90

100.00%

-

-

0.00%

750.40

163,954.90

100.00%

01.05.03.03

JUNTA ASFALTICA EN CUNETAS

m

2,496.20

3.29

8212.50

2,496.20

8,212.50

100.00%

-

-

0.00%

2,496.20

8,212.50

100.00%

439,371.73

100.00%

S/. S/. S/. S/. S/.

-

0.00%

439,371.73

100.00%

COSTO DIRECTO GASTOS GENERALES (7.02 %) GASTOS DE SUPERVISION (2.77 %) GASTOS DE LIQUIDACION (0.00 %) EXPEDIENTE TECNICO (0.00 %)

PRESUPUESTO TOTAL AVANCE PORCENTUAL

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

S/. S/. S/. S/. S/.

439,371.73 30,863.23 13,507.16 0.00 0.00

S/. S/. S/. S/. S/.

S/. %

483,742.12 100.00%

S/. %

03/19/2020

1,077.13 471.40 -

440,920.26 100.00%

S/. %

2,558.56 1,119.74 -

3,678.31 0.00%

S/. S/. S/. S/. S/. S/. %

28,304.67 12,387.42

480,063.82 100.00%

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

VALORIZACION MENSUAL DE OBRA MES DE MARZO (RESPECTO A PARTIDAS NUEVAS) OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

VALORIZACION N° :

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

FECHA DE INICIO:

23-09-2011

FUENTE DE FINANCIAMIENTO: UBICACIÓN: COPANI-ZEPITA

DISTR.: COPANI-ZEPITA

PROV.: YUNGUYO - CHUCUITO JULI

MODALIDAD DE EJECUCIÓN: ITEM 02 02.01 02.01.01 02.01.01.01 02.02 02.02.01

REGION: PUNO

ADMINISTRACION DIRECTA DESCRIPCION

UND

PLAZO DE EJECUCION:

PRESUPUESTO METRADO

P.U.

8

ANTERIOR

COSTO

METRADO

ACTUAL

COSTO

%

12/21/2011

ACUMULADO

COSTO

METRADO

FECHA DE TERMINO: 90 DIAS CALENDARIOS

%

METRADO

SALDO

COSTO

%

METRADO

COSTO

%

OBRAS ADICIONALES POR PARTIDAS NUEVAS PAVIMENTO BASE MATERIAL SELECCIONADO (CANTERA YOROHOCCO)

m3

10,744.00

26.99

289,980.56

0.00

0.00%

CONSTRUCCION DE PONTON L=4.65

-

-

0.00%

-

-

0.00%

10,744.00

289,980.56

100.00%

-

OBRAS PRELIMINARES

02.02.01.01

DEMOLICION DE ESTRUCTURAS DE CONCRETO

m3

53.14

252.04

13,393.41

53.14

13,393.41

100.00%

-

-

0.00%

53.14

13,393.41

100.00%

-

-

0.00%

02.02.01.02

TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

m2

121.19

0.78

94.53

121.19

94.53

100.00%

-

-

0.00%

121.19

94.53

100.00%

-

-

0.00%

02.02.02

MOVIMIENTO DE TIERRAS

02.02.02.01

EXCAVACION C/MAQ EN TERRENO SATURADO

m3

205.70

18.84

3,875.39

205.70

3,875.39

100.00%

-

-

0.00%

205.70

3,875.39

100.00%

-

-

0.00%

02.02.02.02

ACARREO DE MATERIAL EXCEDENTE

m3

310.26

9.43

2,925.75

60.00

565.80

19.34%

-

-

0.00%

60.00

565.80

19.34%

250.26

2,359.95

80.66%

CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE

m3

310.26

11.39

3,533.86

0.00

0.00%

-

-

0.00%

-

-

0.00%

310.26

3,533.86

100.00%

02.02.02.03 02.02.03

OBRAS DE CONCRETO SIMPLE

02.02.03.01

SOLADO EN ZAPATAS F'C=100 KG/CM2.

m2

65.48

19.93

1,305.02

65.48

1,305.02

100.00%

-

-

0.00%

65.48

1,305.02

100.00%

-

-

0.00%

02.02.03.02

FALSA ZAPATA - CONCRETO CICLOPEO F'c=140 Kg/Cm2 + 30 % P.M.

m3

71.89

221.20

15,902.07

71.89

15,902.07

100.00%

-

-

0.00%

71.89

15,902.07

100.00%

-

-

0.00%

02.02.04

OBRAS DE CONCRETO ARMADO

02.02.04.01

ZAPATAS: CONCRETO F'C=210 KG/CM2

m3

69.72

314.01

21,892.78

69.72

21,892.78

100.00%

-

-

0.00%

69.72

21,892.78

100.00%

-

-

0.00%

02.02.04.02

ZAPATAS: ENCOFRADO Y DESENCOFRADO BAJO AGUA

m2

46.56

63.47

2,955.16

46.56

2,955.16

100.00%

-

-

0.00%

46.56

2,955.16

100.00%

-

-

0.00%

02.02.04.03

ZAPATAS: ACERO DE REFUERZO

kg

1,759.95

5.76

10,137.31

1,759.95

10,137.31

100.00%

-

-

0.00%

1,759.95

10,137.31

100.00%

-

-

0.00%

02.02.04.04

MUROS CONCRETO F'C 280 KG/CM2

m3

29.40

410.29

12,062.53

24.70

10,134.16

84.01%

-

-

0.00%

24.70

10,134.16

84.01%

4.70

1,928.36

15.99%

und

7,008.00

15.57

109,114.56

0.00

0.00%

-

-

0.00%

-

-

0.00%

7,008.00

109,114.56

100.00%

02.03 02.03.01 02.03.01.01

SEÑALIZACION TACHAS REFLECTIVAS COLOCACION DE TACHAS REFLECTIVAS BIDIRECCIONALES

COSTO DIRECTO

S/.

487,172.92

S/.

80,255.62

S/.

0.00

S/.

80,255.62

S/.

406,917.30

GASTOS GENERALES (18.91 %)

S/.

34,220.98

S/.

17,104.93

S/.

7,210.36

S/.

17,104.93

S/.

17,116.05

GASTOS DE SUPERVISION (6.36 %)

S/.

12,181.85

S/.

7,331.25

S/.

2,566.72

S/.

7,331.25

S/.

4,850.60

GASTOS DE LIQUIDACION (3.22 %) EXPEDIENTE TECNICO (2.226 %)

S/.

0.00 0.00

S/.

3,126.79 4,598.22

S/.

0.00 0.00

S/.

3,126.79 4,598.22

S/.

-3,126.79 -4,598.22

533,575.75

S/. %

112,416.81

S/. %

9,777.08

S/. %

112,416.81

S/. %

PRESUPUESTO TOTAL AVANCE PORCENTUAL

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

S/. %

100.00%

21.07%

03/19/2020

1.83%

21.07%

421,158.94 78.93%

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

HOJA DE METRADOS ACUMULADOS PROYECTMEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

UBICACIÓN: COPANI-ZEPITA; COPANI-ZEPITA; YUNGUYO-CHUCUITO JULI; PUNO

SUPERVISOR:

ING. WILBER MAMANI APAZA

FECHA:

FEBRERO - 2012

Partida N

01 01.01 01.02 02 02.01 02.01.01 02.02 02.02.01 02.02.02 02.03 02.03.01 02.03.02 02.03.03 02.03.04 02.03.05 02.04 02.04.01 02.04.02 02.04.03 02.05 02.05.01 03 03.01 03.01.01 03.01.02 03.01.03 03.02 03.02.01 03.02.02 03.03 03.03.01 03.03.02 03.03.03 03.04 03.04.01 03.04.02 03.04.03 03.04.04 03.04.05 04 04.01 05 05.01 05.01.01 05.02 05.02.01 05.02.02 05.02.03 05.03 05.03.01 05.03.02 05.03.03 06 06.01 07 07.01 07.02 08 08.01 08.01.01 08.02 08.02.01 08.03 08.03.01 08.03.02 08.03.03 08.03.04 08.03.05 08.03.06 08.03.07 08.03.08 08.03.09 08.03.10 08.04 08.04.01 08.04.02 08.04.03 08.04.04 08.05 08.05.01 09

Especificaciones

met met 2 Und.Programado s/ val corte SET

TRAMO II OBRAS PROVISIONALES CARTEL DE OBRA und ALMACEN Y CASETA DE GUARDIANIA m2 OBRAS PRELIMINARES ELEMENTOS DE SEGURIDAD SEGURIDAD DURANTE LA CONSTRUCCION GLB TRAZO, NIVELACION Y REPLANTEO TRAZO Y REPLANTEO INICIAL KM TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO GLB MOVILIZACION Y DESMOVILIZACION DE PLANTA DE ASFALTO GLB MONTAJE Y DESMONTAJE DE PLANTA DE ASFALTO GLB MOVILIZACION Y DESMOVILIZACION DE PLANTA CHANCADORA GLB MONTAJE Y DESMONTAJE DE PLANTA CHANCADORA GLB ACONDICIONAMIENTO DE ACCESOS A CANTERAS ACONDICIONAMIENTO DE ACCESO A CANTERA KM ACONDICIONAMIENTO DE ACCESO A FUENTE DE AGUA KM DESVIOS PROVISIONALES KM LIMPIEZA DE VIA LIMPIEZA INICIAL DE TERRENO m2 PAVIMENTO SUB RASANTE ESCARIFICADO DE CAPA DE RODADURA EXISTENTE m2 MATERIAL DE PRESTAMO CANTERA CHOCCOPAMPA m3 CONFORMACION DE SUB RASANTE m2 SUB BASE MATERIAL SELECCIONADO (CANTERA TAHUACO) m3 CONFORMACION DE SUB BASE m2 BASE MATERIAL SELECCIONADO (CANTERA TAHUACO) m3 MATERIAL CHANCADO m3 CONFORMACION DE BASE E=0.20 M m2 PAVIMENTO FLEXIBLE IMPRIMACION m2 LIMPIEZA DE SUPERFICIE IMPRIMADA m2 PREPARACION DE MEZCLA ASFALTICA E=2" m2 TRANSPORTE DE MEZCLA ASFALTICA m3 ESPARCIDO Y COMPACTADO m2 PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD EN PAVIMENTO GLB MITIGACION DE IMPACTO AMBIENTAL ETAPA PRELIMINAR CAPACITACION Y SENSIBILIZACION A LA POBLACION GLB ETAPA DE CONSTRUCCION RIEGO DE VIAS DE ACCESO A CANTERAS m3 HABILITACION DE LETRINAS (INCLUYE INSTALACION) und HABILITACION DE BASUREROS GLB ETAPA DE ABANDONO REACONDICIONAMIENTO DE AREA OCUPADA POR CAMPAMENTOHA RECONFORMACION DE CANTERA HA RECONFORMACION DE BOTADERO HA FLETE TERRESTRE FLETE TRANSPORTE LOCAL GLB VARIOS, LIMPIEZA PAGO POR EXTRACCION DE MATERIAL DE CANTERA m3 LIMPIEZA FINAL DE OBRA m2 CONSTRUCCION DE PONTON 6.25 OBRAS PRELIMINARES TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 MOVIMIENTO DE TIERRAS RELLENO COMPACTADO CON MATERIAL SELECCIONADO EN E m3 OBRAS DE CONCRETO ARMADO MUROS: CONCRETO F'C=210 KG/CM2 m3 MUROS: ENCOFRADO Y DESENCOFRADO m2 MUROS: ACERO DE REFUERZO kg LOSA MACIZA: CONCRETO F'C=280 KG/CM2 m3 LOSA MACIZA: ENCOF Y DESENCOF m2 LOSA MACIZA: ACERO DE REFUERZO kg LOSA DE APROXIMACION: CONCRETO F'C= 210 KG/CM2 m3 LOSA DE APROXIMACION: ENCOFRADO Y DESENCOFRADO m2 LOSA DE APROXIMACION: ACERO DE REFUERZO kg LOSA DE APROXIMACION: JUNTA ASFALTICA m OBRAS COMPLEMENTARIAS TARRAJEO EN SARDINEL m2 BARANDAS DE PROTECCION m PINTURA EN BARANDAS METALICAS m2 PINTURA EN SARDINELES m PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD GLB CONSTRUCCION DE ALCANTARILLA TIPO TMC

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

1.00 24.00

1.00

0.50

0.20

13.14 106,244.83

7.30 32100.00

0.50 0.50 0.50 0.50 0.50

0.40

39000.00

38,384.83 1,478.25 38,233.76

met 4 NOV

met 5 DIC

met 6 ENE

Acumulado

-

-

-

-

-

1.00

-

-

0.10

0.10

0.10

-

-

0.50

3.20

-

saldo

24.00

-

0.50

-

-

11.00

2.14

17,000.00

8,800.00

4,250.00

-

-

89,350.00

16,894.83

-

0.05

0.03

0.01

0.49

0.01

-

-

-

-

-

-

-

-

0.50

-

-

-

-

-

-

0.50

-

-

-

-

-

-

-

0.50

-

-

-

-

-

-

-

0.50

-

3.00

0.50

1.00

4.50

3.75

1.00

-

0.50

-

-

-

-

1.50

0.50

0.50

1.00

-

-

-

-

1.50

1.00

27,200.00

19,200.00

-

-

-

89,400.00

15,720.00

38,359.00 25,750.00

-

-

4,000.00

-

-

-

38,384.83

598.40

400.00

-

-

998.40

479.85

4,335.00

5,670.00

-

-

-

35,755.00

2,478.76

-

-

-

14,885.00

7,647.75

-

-

83,119.99

-7,705.16

25.83

-

22,532.75 75,414.83

-

4,590.00

10,295.00

-

26,424.99

34,680.00

22,015.00

10,624.48 10,512.80 106,244.83

-

-

2,994.00

1,545.00

-

-

-

-

-

-

-

99,674.83 86,534.83 86,534.83 4,395.97 86,534.83

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

0.50

0.05

3.00 549.79 3.00 8.00

met 7 FEB

-

27,200.00

8.25 2.00 2.50 105,120.00

met 3 OCT

3.00 8.00

116.00

-

5,421.00

5,203.48

-

150.00

10,362.80

6,375.00

-

6,375.00

99,869.83

3,190.00 -

-

3,190.00

96,484.83

306.00 34.00

576.00

-

-

86,534.83

-

-

86,534.83

-

-

-

-

4,395.97

-

-

-

-

-

86,534.83

0.10

0.10

0.10

-

-

0.35

0.15

0.10

0.20

0.10

0.60

-

0.15

1.15

1.85

36.00

180.00 -

180.00 -

44.00

-

-

440.00

109.79

-

3.00

-

-

8.00

-

-

-

-

-

-

-

-

-

-

-

-

-

6.00

-

-

-

-

-

-

-

4.00

-

-

-

-

-

-

-

4.00

-

0.30

0.15

0.15

-

-

0.90

0.10

-

-

-

-

-

-

-

58,936.78

-

-

-

-

-

-

-

106,244.83

59.00

6.00

-

-

-

-

-

6.00

53.00

144.00

-

-

-

-

-

-

-

144.00

21.66 53.98 327.57 13.69 28.04 1,321.42 12.54 6.58 252.88 32.90

-

-

-

-

-

-

-

21.66

-

-

-

-

-

-

53.98

-

-

-

-

-

-

-

327.57

-

-

-

-

-

-

-

13.69

-

-

-

-

-

-

-

28.04

-

-

-

-

-

-

1,321.42

-

-

-

-

12.54

-

-

-

-

-

-

6.58

-

-

-

-

-

-

-

252.88

-

-

-

-

-

-

-

32.90

9.00 12.00 12.00 9.45

-

-

-

-

-

9.00

-

-

-

-

-

-

-

-

12.00

-

-

-

-

-

12.00

-

-

-

-

-

-

-

-

9.45

1.00

-

-

-

-

-

-

-

1.00

-

-

-

-

-

-

6.00 4.00 4.00 1.00

0.3

58,936.78 106,244.83

-

03/19/2020

-

-

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

HOJA DE METRADOS ACUMULADOS PROYECTMEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

UBICACIÓN: COPANI-ZEPITA; COPANI-ZEPITA; YUNGUYO-CHUCUITO JULI; PUNO

SUPERVISOR:

ING. WILBER MAMANI APAZA

FECHA:

FEBRERO - 2012

met met 2 Und.Programado s/ val corte SET EXCAVACION EN FORMA MANUAL PARA ESTRUCTURAS m3 23.71 ALCANTARILLAS TMC D=24" m 9.50 RELLENO DE ESTRUCTURAS CON MATERIAL DE PRESTAMO m3 21.91 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 8.66 CONCRETO CICLOPEO F'c=140 Kg/Cm2 + 30 % P.G. EN CIMENTACI m3 1.19 CONCRETO 175 KG/CM2 EN MURO Y ALERO m3 1.89 ENCAUZAMIENTO DE CURSOS DE AGUA OBRAS PRELIMINARES TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION m2 15.00 MOVIMIENTO DE TIERRAS 2.88 EXCAVACION EN FORMA MANUAL m3 3.00 EXCAVACION C/MAQ EN TERRENO SATURADO m3 300.00 OBRAS DE CONCRETO SIMPLE MURO: CONCRETO CICLOPEO 1:10 + 30% PG m3 37.50 MUROS: ENCOFRADO Y DESENCOFRADO m2 120.00 CONSTRUCCION DE CUNETAS OBRAS PRELIMINARES 417.75 TRAZO Y REPLANTEO INICIAL m 27,280.00 6200.00 MOVIMIENTO DE TIERRAS 158.56 EXCAVACION EN FORMA MANUAL m3 3,410.00 128.00 PERFILADO Y COMPACTADO EN CUNETAS m2 19,096.00 OBRAS DE CONCRETO SIMPLE ENCOFRADO Y DESENCOFRADO EN CUNETAS m2 8,190.00 CUNETA: CONCRETO f¨c=140 kg/cm2 m3 1,443.40 JUNTA ASFALTICA EN CUNETAS m 8,190.00 LOSA PEATONAL LOSA DE CONCRETO DE 0.15 M F'C 145 KG/CM2 m3 1.82 LOSA MACIZA: ACERO DE REFUERZO kg 18.63 LOSA DE CONCRETO DE 0.15 M ENCOFRADO Y DESENCOFRADO m2 93.82 OBRAS PROVISIONALES TRAZO DE EJES EN PAVIMENTO TRAZO Y REPLANTEO EN PAVIMENTO m 39,420.00 SEÑALIZACION SEÑALES REGLAMENTARIAS und 4.00 SEÑALES PREVENTIVAS und 2.00 SEÑALES INFORMATIVAS und 2.00 TERMINAL DE AMORTIGUACION EN GUARDAVIAS und 2.00 GUARDAVIAS DE FIERRO GALVANIZADO MOD 24.00 HITOS KILOMETRICOS und 13.00 MARCAS EN EL PAVIMENTO CON MICROESFERAS m2 3,245.58

Partida N

09.01 09.02 09.03 09.04 09.05 09.06 10 10.01 10.01.01 10.02 10.02.01 10.02.02 10.03 10.03.01 10.03.02 11 11.01 11.01.01 11.02 11.02.01 11.02.02 11.03 11.03.01 11.03.02 11.03.03 11.04 11.04.01 11.04.02 11.04.03 12 12.01 12.01.01 13 13.01 13.02 13.03 13.04 13.05 13.06 13.07

Especificaciones

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

met 3 OCT

met 4 NOV

met 5 DIC

met 6 ENE

met 7 FEB

Acumulado

saldo

-

-

-

-

-

-

-

-

-

-

-

9.50

-

-

-

-

-

-

21.91

-

-

-

-

8.66

-

-

-

-

-

-

-

1.19

-

-

-

-

1.89

-

-

-

-

-

-

15.00

-

-

-

-

-

2.88

-

-

-

-

-

-

-

-

-

-

37.50

-

-

-

-

-

-

-

120.00

-

-

-

-

950.00

-

-

1,330.00

-

-

-

-

-

-

8,190.00

-

-

-

-

-

-

1,443.40

-

-

-

-

-

-

8,190.00

-

-

-

-

-

-

1.82

-

-

-

-

-

18.63

-

-

-

-

-

-

93.82

-

-

-

-

-

-

39,420.00

-

-

-

-

4.00

-

-

-

-

-

-

-

2.00

-

-

-

-

-

2.00

-

-

-

-

-

-

2.00

-

-

-

-

-

24.00

-

-

-

-

-

-

13.00

-

-

-

-

3,245.58

6,290.00

950.00 -

23.71

0.12 300.00

740.00

13,647.75

13,632.25

950.00

3,136.56

273.44

1,202.40

2,532.40

16,563.60

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

CUADRO COMPARATIVO DE METRADOS PROY:

MEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

UBICACIÓN: COPANI-ZEPITA; COPANI-ZEPITA; YUNGUYO-CHUCUITO JULI; PUNO

RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FECHA:

SUPERVISOR:

ING. WILBER MAMANI APAZA

FEBRERO - 2012

Nº Part

Especificaciones

Und.

Met. Prog.

Met. Ejecutado

DIFERENCIA +

PORCENTAJE -

+

-

TRAMO II 01

OBRAS PROVISIONALES

01.01

CARTEL DE OBRA

und

1.00

1.00

0.00

0.00%

01.02

ALMACEN Y CASETA DE GUARDIANIA

m2

24.00

0.00

24.00

100.00%

GLB

0.50

0.50

0.00

0.00%

02 02.01 02.01.01 02.02

OBRAS PRELIMINARES ELEMENTOS DE SEGURIDAD SEGURIDAD DURANTE LA CONSTRUCCION TRAZO, NIVELACION Y REPLANTEO

02.02.01

TRAZO Y REPLANTEO INICIAL

KM

13.14

11.00

2.14

16.29%

02.02.02

TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

m2

106,244.83

89,350.00

16,894.83

15.90%

02.03

MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO

02.03.01

MOVILIZACION Y DESMOV DE MAQUINARIA Y EQUIPO

GLB

0.50

0.49

0.01

2.00%

02.03.02

MOVILIZACION Y DESMOVILIZACION DE PLANTA DE ASFALTO

GLB

0.50

0.00

0.50

100.00%

02.03.03

MONTAJE Y DESMONTAJE DE PLANTA DE ASFALTO

GLB

0.50

0.00

0.50

100.00%

02.03.04

MOVILIZACION Y DESMOVILIZACION DE PLANTA CHANCADORA

GLB

0.50

0.00

0.50

100.00%

02.03.05

MONTAJE Y DESMONTAJE DE PLANTA CHANCADORA

GLB

0.50

0.00

0.50

100.00%

02.04

ACONDICIONAMIENTO DE ACCESOS A CANTERAS

02.04.01

ACONDICIONAMIENTO DE ACCESO A CANTERA

KM

8.25

4.50

3.75

45.45%

02.04.02

ACONDICIONAMIENTO DE ACCESO A FUENTE DE AGUA

KM

2.00

1.50

0.50

25.00%

02.04.03

DESVIOS PROVISIONALES

KM

2.50

1.50

1.00

40.00%

m2

105,120.00

89,400.00

15,720.00

14.95%

02.05 02.05.01 03 03.01

LIMPIEZA DE VIA LIMPIEZA INICIAL DE TERRENO PAVIMENTO SUB RASANTE

03.01.01

ESCARIFICADO DE CAPA DE RODADURA EXISTENTE

m2

38,384.83

38,384.83

0.00

0.00%

03.01.02

MATERIAL DE PRESTAMO CANTERA CHOCCOPAMPA

m3

1,478.25

998.40

479.85

32.46%

CONFORMACION DE SUB RASANTE

m2

38,233.76

35,755.00

2,478.76

6.48%

03.01.03 03.02

SUB BASE

03.02.01

MATERIAL SELECCIONADO (CANTERA TAHUACO)

m3

22,532.75

14,885.00

7,647.75

33.94%

03.02.02

CONFORMACION DE SUB BASE

m2

75,414.83

75,414.83

0.00

0.00%

03.03

BASE

03.03.01

MATERIAL SELECCIONADO (CANTERA TAHUACO)

m3

10,624.48

5,421.00

5,203.48

48.98%

03.03.02

MATERIAL CHANCADO

m3

10,512.80

150.00

10,362.80

98.57%

03.03.03

CONFORMACION DE BASE E=0.20 M

m2

106,244.83

6,375.00

99,869.83

94.00%

03.04

PAVIMENTO FLEXIBLE

03.04.01

IMPRIMACION

m2

99,674.83

3,190.00

96,484.83

96.80%

03.04.02

LIMPIEZA DE SUPERFICIE IMPRIMADA

m2

86,534.83

0.00

86,534.83

100.00%

03.04.03

PREPARACION DE MEZCLA ASFALTICA E=2"

m2

86,534.83

0.00

86,534.83

100.00%

03.04.04

TRANSPORTE DE MEZCLA ASFALTICA

m3

4,395.97

0.00

4,395.97

100.00%

03.04.05

ESPARCIDO Y COMPACTADO

m2

86,534.83

0.00

86,534.83

100.00%

04

PRUEBAS DE CONTROL DE CALIDAD GLB

0.50

0.35

0.15

30.00%

GLB

3.00

1.15

1.85

61.67%

04.01 05 05.01 05.01.01 05.02

PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD EN PAVIMENTO MITIGACION DE IMPACTO AMBIENTAL ETAPA PRELIMINAR CAPACITACION Y SENSIBILIZACION A LA POBLACION ETAPA DE CONSTRUCCION

05.02.01

RIEGO DE VIAS DE ACCESO A CANTERAS

m3

549.79

440.00

109.79

19.97%

05.02.02

HABILITACION DE LETRINAS (INCLUYE INSTALACION)

und

3.00

3.00

0.00

0.00%

05.02.03

HABILITACION DE BASUREROS

GLB

8.00

8.00

0.00

0.00%

05.03

ETAPA DE ABANDONO

05.03.01

REACONDICIONAMIENTO DE AREA OCUPADA POR CAMPAMENTO Y MAQUIN.

HA

6.00

0.00

6.00

100.00%

05.03.02

RECONFORMACION DE CANTERA

HA

4.00

0.00

4.00

100.00%

05.03.03

RECONFORMACION DE BOTADERO

HA

4.00

0.00

4.00

100.00%

GLB

1.00

0.90

0.10

10.00%

06 06.01 07

FLETE TERRESTRE FLETE TRANSPORTE LOCAL VARIOS, LIMPIEZA

07.01

PAGO POR EXTRACCION DE MATERIAL DE CANTERA

m3

58,936.78

0.00

58,936.78

100.00%

07.02

LIMPIEZA FINAL DE OBRA

m2

106,244.83

0.00

106,244.83

100.00%

m2

59.00

6.00

53.00

89.83%

m3

144.00

0.00

144.00

100.00%

08 08.01 08.01.01 08.02 08.02.01 08.03

CONSTRUCCION DE PONTON 6.25 OBRAS PRELIMINARES TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION MOVIMIENTO DE TIERRAS RELLENO COMPACTADO CON MATERIAL SELECCIONADO EN ESTRUCTURAS OBRAS DE CONCRETO ARMADO

08.03.01

MUROS: CONCRETO F'C=210 KG/CM2

m3

21.66

0.00

21.66

100.00%

08.03.02

MUROS: ENCOFRADO Y DESENCOFRADO

m2

53.98

0.00

53.98

100.00%

08.03.03

MUROS: ACERO DE REFUERZO

kg

327.57

0.00

327.57

100.00%

08.03.04

LOSA MACIZA: CONCRETO F'C=280 KG/CM2

m3

13.69

0.00

13.69

100.00%

08.03.05

LOSA MACIZA: ENCOF Y DESENCOF

m2

28.04

0.00

28.04

100.00%

08.03.06

LOSA MACIZA: ACERO DE REFUERZO

kg

1,321.42

0.00

1,321.42

100.00%

08.03.07

LOSA DE APROXIMACION: CONCRETO F'C= 210 KG/CM2

m3

12.54

0.00

12.54

100.00%

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

CUADRO COMPARATIVO DE METRADOS PROY:

MEJORAMIENTO DE LA RED VIAL DEPARTAMENTAL

UBICACIÓN: COPANI-ZEPITA; COPANI-ZEPITA; YUNGUYO-CHUCUITO JULI; PUNO

RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FECHA:

SUPERVISOR:

ING. WILBER MAMANI APAZA

FEBRERO - 2012

Nº Part

Especificaciones

Und.

08.03.08

LOSA DE APROXIMACION: ENCOFRADO Y DESENCOFRADO

m2

Met. Prog. 6.58

08.03.09

LOSA DE APROXIMACION: ACERO DE REFUERZO

kg

252.88

08.03.10

LOSA DE APROXIMACION: JUNTA ASFALTICA

m

32.90

Met. Ejecutado 0.00

DIFERENCIA +

PORCENTAJE -

+

6.58

100.00%

0.00

252.88

100.00%

0.00

32.90

100.00%

08.04

OBRAS COMPLEMENTARIAS

08.04.01

TARRAJEO EN SARDINEL

m2

9.00

0.00

9.00

100.00%

08.04.02

BARANDAS DE PROTECCION

m

12.00

0.00

12.00

100.00%

08.04.03

PINTURA EN BARANDAS METALICAS

m2

12.00

0.00

12.00

100.00%

08.04.04

PINTURA EN SARDINELES

m

9.45

0.00

9.45

100.00%

GLB

1.00

0.00

1.00

100.00%

08.05 08.05.01 09

PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD CONSTRUCCION DE ALCANTARILLA TIPO TMC

09.01

EXCAVACION EN FORMA MANUAL PARA ESTRUCTURAS

m3

23.71

0.00

23.71

100.00%

09.02

ALCANTARILLAS TMC D=24"

m

9.50

0.00

9.50

100.00%

09.03

RELLENO DE ESTRUCTURAS CON MATERIAL DE PRESTAMO

m3

21.91

0.00

21.91

100.00%

09.04

ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

8.66

0.00

8.66

100.00%

09.05

CONCRETO CICLOPEO F'c=140 Kg/Cm2 + 30 % P.G. EN CIMENTACIONES

m3

1.19

0.00

1.19

100.00%

09.06

CONCRETO 175 KG/CM2 EN MURO Y ALERO

m3

1.89

0.00

1.89

100.00%

m2

15.00

0.00

15.00

100.00%

10 10.01 10.01.01 10.02

ENCAUZAMIENTO DE CURSOS DE AGUA OBRAS PRELIMINARES TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION MOVIMIENTO DE TIERRAS

10.02.01

EXCAVACION EN FORMA MANUAL

m3

3.00

2.88

0.12

4.00%

10.02.02

EXCAVACION C/MAQ EN TERRENO SATURADO

m3

300.00

0.00

300.00

100.00%

10.03

OBRAS DE CONCRETO SIMPLE

10.03.01

MURO: CONCRETO CICLOPEO 1:10 + 30% PG

m3

37.50

0.00

37.50

100.00%

10.03.02

MUROS: ENCOFRADO Y DESENCOFRADO

m2

120.00

0.00

120.00

100.00%

m

27,280.00

13,647.75

13,632.25

49.97%

11 11.01 11.01.01 11.02

CONSTRUCCION DE CUNETAS OBRAS PRELIMINARES TRAZO Y REPLANTEO INICIAL MOVIMIENTO DE TIERRAS

11.02.01

EXCAVACION EN FORMA MANUAL

m3

3,410.00

3,136.56

273.44

8.02%

11.02.02

PERFILADO Y COMPACTADO EN CUNETAS

m2

19,096.00

2,532.40

16,563.60

86.74%

11.03

OBRAS DE CONCRETO SIMPLE

11.03.01

ENCOFRADO Y DESENCOFRADO EN CUNETAS

m2

8,190.00

0.00

8,190.00

100.00%

11.03.02

CUNETA: CONCRETO f¨c=140 kg/cm2

m3

1,443.40

0.00

1,443.40

100.00%

11.03.03

JUNTA ASFALTICA EN CUNETAS

m

8,190.00

0.00

8,190.00

100.00%

11.04

LOSA PEATONAL

11.04.01

LOSA DE CONCRETO DE 0.15 M F'C 145 KG/CM2

m3

1.82

0.00

1.82

100.00%

11.04.02

LOSA MACIZA: ACERO DE REFUERZO

kg

18.63

0.00

18.63

100.00%

11.04.03

LOSA DE CONCRETO DE 0.15 M ENCOFRADO Y DESENCOFRADO

m2

93.82

0.00

93.82

100.00%

m

39,420.00

0.00

39,420.00

100.00%

12 12.01 12.01.01 13

-

OBRAS PROVISIONALES TRAZO DE EJES EN PAVIMENTO TRAZO Y REPLANTEO EN PAVIMENTO SEÑALIZACION

13.01

SEÑALES REGLAMENTARIAS

und

4.00

0.00

4.00

100.00%

13.02

SEÑALES PREVENTIVAS

und

2.00

0.00

2.00

100.00%

13.03

SEÑALES INFORMATIVAS

und

2.00

0.00

2.00

100.00%

13.04

TERMINAL DE AMORTIGUACION EN GUARDAVIAS

und

2.00

0.00

2.00

100.00%

13.05

GUARDAVIAS DE FIERRO GALVANIZADO

MOD

24.00

0.00

24.00

100.00%

13.06

HITOS KILOMETRICOS

und

13.00

0.00

13.00

100.00%

13.07

MARCAS EN EL PAVIMENTO CON MICROESFERAS

m2

3,245.58

0.00

3,245.58

100.00%

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

INGRESAR DATOS (NO IMPRIMIR)

VALO OBRA: META: UNIDAD EJECUTORA : 001 SEDE PUNO COMPONENTE : FUENTE DE FINANCIAMIENTO: UBICACIÓN: DISTR.: PROV.: MODALIDAD DE EJECUCIÓN:ADMINISTRACION DIRECTA ITEM

DESCRIPCION

REGION: PUNO PRESUPUESTO

UND METRADO

0

TRAMO II

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

0

0

0

0.00

COSTO DIRECTO

S/.

GASTOS GENERALES (18.91 %)

S/.

GASTOS DE SUPERVISION (6.36 %) GASTOS DE LIQUIDACION (3.22 %) EXPEDIENTE TECNICO (2.226 %)

PRESUPUESTO TOTAL AVANCE PORCENTUAL

S/. %

VALORIZACION FINAL DE OBRA VALORIZACION N° : ING. RESIDENTE: ING. SUPERVISOR: FECHA DE INICIO: PLAZO DE EJECUCION:120 DIAS CALENDARIOS

REGION: PUNO PRESUPUESTO P.U.

ANTERIOR COSTO

METRADO

COSTO

ACTUAL %

METRADO

COSTO

%

1.40

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

600.00

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1.47

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

18.90

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9.02

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

6.13

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 208.58

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

18.65

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

17.07

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

22.60

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

16.17

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 37.80

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

23.69

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

28.56

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

6.66

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 800.00

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

308.49

-

0.00

#DIV/0!

-

-

#DIV/0!

Err:509

S/.

Err:509

S/.

Err:509

Err:509

S/.

Err:509

S/.

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 100.00%

S/. %

Err:509 Err:509

S/. %

Err:509 Err:509

FECHA DE TERMINO:

LENDARIOS ACUMULADO METRADO

SALDO

COSTO

%

METRADO

COSTO

%

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

-

-

#DIV/0!

-

-

S/.

Err:509

S/.

Err:509

S/.

Err:509

S/.

Err:509

#DIV/0! 0K

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

S/. %

Err:509 Err:509

S/. %

Err:509 Err:509

1.15

1.15

1.1431

3

3

2.982

17.2

17.2

17.0968 21.2219

Item 02 02.02 02.02.01 02.02.02 02.05 02.05.01 03 03.03 03.03.01 03.03.02 03.03.03 03.04 03.04.01 04 04.01 05 05.01 05.01.01 05.02 05.02.01 06 06.01

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

Descripcion Partida

Und

TRAMO II OBRAS PRELIMINARES TRAZO, NIVELACION Y REPLANTEO TRAZO Y REPLANTEO INICIAL TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION LIMPIEZA DE VIA LIMPIEZA INICIAL DE TERRENO PAVIMENTO BASE MATERIAL SELECCIONADO (CANTERA CHOCOPAMPA) MATERIAL CHANCADO CONFORMACION DE BASE E=0.20 M PAVIMENTO FLEXIBLE IMPRIMACION PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD EN PAVIMENTO MITIGACION DE IMPACTO AMBIENTAL ETAPA PRELIMINAR CAPACITACION Y SENSIBILIZACION A LA POBLACION ETAPA DE CONSTRUCCION RIEGO DE VIAS DE ACCESO A CANTERAS FLETE TERRESTRE FLETE TRANSPORTE LOCAL

03/19/2020

Valorización Actual Metrado Valorizado

% de Avance

KM m2

1.00 4,675.00

138.79 561.00

7.61% 4.40%

m2

2,400.00

144.00

2.28%

m3

576.00 115.20 5,760.00

10,880.64 11,230.85

5.42%

m3 m2 m2 GLB

12,499.20

1.10% 5.42%

3,190.00 -

12,887.60

3.20%

0.05

646.30

10.00%

GLB

0.50

2,500.00

16.67%

m3

20.00

355.20

3.64%

GLB

0.05

250.00

5.00%

68

Item

02 02.02 02.02.01 02.02.02 2.04 02.04.01 02.04.02 02.04.03 03.01 03.01.02 03.02 03.02.01 03.03 03.03.02 03.03.03 04 04.01 05 05.01 05.01.01 05.02 05.02.01 07 07.01 08 08.01 08.01.01

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

Descripcion Partida

Und

TRAMO II OBRAS PRELIMINARES TRAZO, NIVELACION Y REPLANTEO TRAZO Y REPLANTEO INICIAL TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION ACONDICIONAMIENTO DE ACCESOS A CANTERAS ACONDICIONAMIENTO DE ACCESO A CANTERA ACONDICIONAMIENTO DE ACCESO A FUENTE DE AGUA DESVIOS PROVISIONALES SUB RASANTE MATERIAL DE PRESTAMO CANTERA CHOCCOPAMPA SUB BASE MATERIAL SELECCIONADO (CANTERA CHOCOPAMPA) BASE MATERIAL CHANCADO CONFORMACION DE BASE E=0.20 M PRUEBAS DE CONTROL DE CALIDAD PRUEBAS Y ENSAYOS DE CONTROL DE CALIDAD EN PAVIMENTO MITIGACION DE IMPACTO AMBIENTAL ETAPA PRELIMINAR CAPACITACION Y SENSIBILIZACION A LA POBLACION ETAPA DE CONSTRUCCION RIEGO DE VIAS DE ACCESO A CANTERAS VARIOS, LIMPIEZA PAGO POR EXTRACCION DE MATERIAL DE CANTERA CONSTRUCCION DE PONTON 4.65 OBRAS PRELIMINARES TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

03/19/2020

Valorización Actual Metrado Valorizado

% de Avance

KM

0.50

m2

5,525.00

KM

0.40

KM KM

0.10 0.30

m3

69.40 663.00

0.00%

576.64 144.16

0.00%

0.00%

345.82

0.00% 0.00%

450.00

8,617.50

0.00%

m3

1,254.00

23,688.06

0.00%

m3

585.00

57,031.65

0.00%

m2

4,800.00 -

10,416.00

0.00%

GLB

0.05 -

646.30

0.00%

GLB

0.50

2,500.00

0.00%

m3

10.00 -

177.60

0.00%

m3

6,540.00

13,080.00

0.00%

m2

53.00

6.36

100.00%

-

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

VALORIZACION FINAL DE OBRA (DEDUCTIVOS EN OBRA) OBRA: META: UNIDAD EJECUTORA : 001 SEDE PUNO

VALORIZACION N° :

COMPONENTE :

ING. RESIDENTE:

FUENTE DE FINANCIAMIENTO: UBICACIÓN:

ING. SUPERVISOR: DISTR.:

PROV.:

REGION: PUNO

FECHA DE INICIO:

MODALIDAD DE EJECUCIÓN:ADMINISTRACION DIRECTA

ITEM

DESCRIPCION

PLAZO DE EJECUCION:120 DIAS CALENDARIOS PRESUPUESTO

UND METRADO

P.U.

ANTERIOR

COSTO

METRADO

ACTUAL

COSTO

%

METRADO

ACUMULADO

COSTO

%

METRADO

COSTO

%

0

TRAMO II

Err:509

Err:509

Err:509

Err:509

1.40

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

600.00

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1.47

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

18.90

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9.02

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

6.13

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

208.58

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

18.65

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

17.07

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

22.60

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

16.17

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

37.80

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

23.69

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

28.56

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

6.66

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

0

0

-

-

Err:509 0

Err:509

800.00

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

0.00

308.49

0.00

-

0.00

#DIV/0!

-

-

#DIV/0!

-

-

#DIV/0!

COSTO DIRECTO

S/.

Err:509

S/.

Err:509

S/.

Err:509

S/.

Err:509

GASTOS GENERALES (18.91 %)

S/.

Err:509

S/.

Err:509

S/.

Err:509

S/.

Err:509

GASTOS DE SUPERVISION (6.36 %)

S/.

Err:509

S/.

Err:509

S/.

Err:509

S/.

Err:509

GASTOS DE LIQUIDACION (3.22 %)

S/.

Err:509

S/.

Err:509

S/.

Err:509

S/.

Err:509

EXPEDIENTE TECNICO (2.226 %)

S/.

Err:509

S/.

Err:509

S/.

Err:509

S/.

Err:509

Err:509

S/. %

Err:509

S/. %

Err:509

S/. %

PRESUPUESTO TOTAL AVANCE PORCENTUAL

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

S/. %

100.00%

03/19/2020

Err:509

Err:509

Err:509 Err:509

42

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

VALORIZACION MENSUAL DE OBRA (RESPECTO A PARTIDAS VINCULANTES) OBRA: META: UNIDAD EJECUTORA : 001 SEDE PUNO

VALORIZACION N° :

COMPONENTE :

ING. RESIDENTE:

FUENTE DE FINANCIAMIENTO: UBICACIÓN:

ING. SUPERVISOR: DISTR.:

PROV.:

REGION: PUNO

FECHA DE INICIO:

MODALIDAD DE EJECUCIÓN:ADMINISTRACION DIRECTA ITEM

DESCRIPCION

FECHA DE TERMINO:

PLAZO DE EJECUCION: 120 DIAS CALENDARIOS PRESUPUESTO

UND METRADO

P.U.

ANTERIOR

COSTO

METRADO

COSTO

ACTUAL %

METRADO

ACUMULADO

COSTO

%

METRADO

SALDO

COSTO

%

METRADO

COSTO

%

PARTIDAS VINCULANTES 02.10.01

VENTANA METALICA por (ventana tipo sistema)

p2

76.50

11.30

864.45

0.00

0.00%

76.50

864.45

100.00%

76.50

864.45

100.00%

-

-

0.00%

02.10.02

Vidrio semidoble en puertas

m2

11.57

2.89

33.44

0.00

0.00%

11.57

33.44

100.00%

11.57

33.44

99.99%

-

-

0.01%

02.13.06

ARTEFACTO FLUORESCENTE INDUSTRIAL PESADO CON EQUIPO Y LAMPARA DE 2x40 W por (lamparas )

m2

3.00

95.00

285.00

0.00

0.00%

3.00

285.00

100.00%

3.00

285.00

100.00%

-

-

0.00%

COSTO DIRECTO

S/.

1,182.89

S/.

0.00

S/.

1,182.89

S/.

1,182.89

S/.

0.00

GASTOS GENERALES (18.91 %)

S/.

252.11

S/.

0.00

S/.

252.11

S/.

252.11

S/.

0.00

GASTOS DE SUPERVISION (6.36 %)

S/.

108.06

S/.

0.00

S/.

108.06

S/.

108.06

S/.

0.00

GASTOS DE LIQUIDACION (3.22 %) EXPEDIENTE TECNICO (2.226 %)

S/.

46.09 67.77

S/.

0.00 0.00

S/.

46.09 67.77

S/.

46.09 67.77

S/.

0.00 0.00

1,656.91

S/. %

0.00

S/. %

1,656.91

S/. %

1,656.91

S/. %

PRESUPUESTO TOTAL AVANCE PORCENTUAL

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

S/. %

100.00%

03/19/2020

0.00%

100.00%

100.00%

0.00 0.00%

68

ITEM 02 02.01 02.01.01 02.01.01.01 02.02 02.02.01

UND

ACTUAL COSTO

METRADO

%

OBRAS ADICIONALES POR PARTIDAS NUEVAS PAVIMENTO BASE MATERIAL SELECCIONADO (CANTERA YOROHOCCO)

m3

CONSTRUCCION DE PONTON L=4.65

-

-

0.00%

-

OBRAS PRELIMINARES

02.02.01.01

DEMOLICION DE ESTRUCTURAS DE CONCRETO

m3

53.14

13,393.41

100.00%

02.02.01.02

TRAZO Y REPLANTEO DURANTE LA CONSTRUCCION

m2

121.19

94.53

100.00%

02.02.02

MOVIMIENTO DE TIERRAS

02.02.02.01

EXCAVACION C/MAQ EN TERRENO SATURADO

m3

205.70

3,875.39

100.00%

02.02.02.02

ACARREO DE MATERIAL EXCEDENTE

m3

60.00

565.80

19.34%

02.02.03

OBRAS DE CONCRETO SIMPLE

02.02.03.01

SOLADO EN ZAPATAS F'C=100 KG/CM2.

m2

65.48

1,305.02

100.00%

02.02.03.02

FALSA ZAPATA - CONCRETO CICLOPEO F'c=140 Kg/Cm2 + 30 % P.M.

m3

71.89

15,902.07

100.00%

02.02.04

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

DESCRIPCION

OBRAS DE CONCRETO ARMADO

02.02.04.01

ZAPATAS: CONCRETO F'C=210 KG/CM2

m3

69.72

21,892.78

100.00%

02.02.04.02

ZAPATAS: ENCOFRADO Y DESENCOFRADO BAJO AGUA

m2

46.56

2,955.16

100.00%

02.02.04.03

ZAPATAS: ACERO DE REFUERZO

kg

1,759.95

10,137.31

100.00%

02.02.04.04

MUROS CONCRETO F'C 280 KG/CM2

m3

24.70

10,134.16

84.01%

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

RESUMEN GENERAL DE VALORIZACIONES DE OBRA SEGÚN PRESUPUESTO BASE

ITEM

OBRA: META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA : COMPONENTE : FUENTE DE FINANCIAMIENTO: UBICACIÓN: MODALIDAD DE EJECUCION:

001 SEDE PUNO VALORIZACION N° : MEJORAMIENTO DE LA CARRETERA YUNGUYO ING. – RESIDENTE: DONACIONES Y TRANSFERENCIAS ING. SUPERVISOR: COPANI-ZEPITA; CHUCUITO JULI-YUNGUYO; PU FECHA DE INICIO: ADMINISTRACION DIRECTA PLAZO DE EJECUCION:

DESCRIPCION DE COMPONENTES

MONTO PPTO

AVANCE ANTERIOR AC. MONTO

%

8 ING. MARCO ANTONIO ALIAGA ARPASI ING. WILBER MAMANI APAZA 23-09-2011 FECHA DE TERMINO: 21-12-2011 90 DIAS CALENDARIO

AVANCE ACTUAL MONTO

AVANCE ACUMULADO

%

MONTO

1.00

OBRAS PROVISIONALES

2.00

OBRAS PRELIMINARES

3.00

PAVIMENTO

4.00

PRUEBAS DE CONTROL DE CALIDAD

5.00

MITIGACION DE IMPACTO AMBIENTAL

6.00

FLETE TERRESTRE

7.00

VARIOS, LIMPIEZA

8.00

CONSTRUCCION DE PONTON 4.64 m.

9.00

CONSTRUCCION DE ALCANTARILLA TIPO TMC

10.00

ENCAUZAMIENTO DE CURSOS DE AGUA

11.00

CONSTRUCCION DE CUNETAS

12.00

OBRAS PROVISIONALES

11,431.80

-

0.00

-

0.00

13.00

SEÑALIZACION

55,618.47

-

0.00

-

0.00

TOTAL COSTO DIRECTO

5,846.97

1,293.69

22.13

-

0.00

70,394.78

48,073.42

68.29

-

7,070,748.35

800,235.54

11.32

-

6,463.00

6,463.00

100.00

-

64,974.87

22,607.20

34.79

500.00

%

SALDO MONTO

1,293.69

22.13

0.00

48,073.42

0.00

800,235.54

0.00

6,463.00

100.00

0.77

23,107.20

35.56

%

4,553.28

77.87

68.29

22,321.36

31.71

11.32

6,270,512.81

88.68

41,867.67

5,000.00

4,750.00

95.00

-

0.00

4,750.00

95.00

250.00

5.00

158,246.60

13,080.00

8.27

-

0.00

13,080.00

8.27

145,166.60

91.73

42,754.16

26,410.41

61.77

-

0.00

26,410.41

61.77

16,343.75

38.23

0.00

-

0.00

0.00

6,075.77

100.00

-

0.00

43.52

0.28

15,431.46

99.72

8.95

166,845.56

19.90

671,772.66

80.10

-

0.00

11,431.80

100.00

-

0.00

55,618.47

100.00

6,075.77

-

15,474.98

43.52

0.28

838,618.22

91,829.22

10.95

8,351,647.97

75,016.34

-

1,014,786.00

75,516.34

1,090,302.34

7,261,345.63

GASTOS GENERALES

304,202.46

30,572.35

1,095.13

31,667.48

272,534.98

GASTOS DE SUPERVISION

123,794.26

12,441.31

445.66

12,886.97

110,907.29

LIQUIDACION DE OBRA

24,619.03

2,474.21

88.63

2,562.84

22,056.19

ELABORACION DE EXP. TECNICO

21,951.92

2,206.17

79.03

2,285.20

19,666.72

PRESUPUESTO TOTAL

0.00 64.44

8,826,215.64

1,062,480.04

12.05

77,224.78

0.88

1,139,704.82

12.93

7,686,510.82

87.07

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

RESUMEN DE VALORIZACIONES DE AVANCE DE OBRA OBRA: META: UNIDAD EJECUTORA : COMPONENTE : FUENTE DE FINANCIAMIENTO: RECURSOS DETERMINADOS UBICACIÓN: MODALIDAD DE EJECUCIÓN: VALORIZACIONES MENSUALES

PRESUPUESTO BASE SEGÚN EXPEDIENTE TECNICO

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL 001 SEDE PUNO VALORIZACION N° 8 MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA RECURSOS DETERMINADOS ING. RESIDENTE: ING. MARCO ANTONIO ALIAGA ARPASI ING. SUPERVISOR: ING. WILBER MAMANI APAZA COPANI-ZEPITA, CHUCUITO JULFECHA DE INICIO: 23-09-2011 ADMINISTRACION DIRECTA PLAZO DE EJECUCION: 90 DIAS CALENDARIO COSTO DIRECTO

GASTOS GENERALES

GASTOS DE SUPERVISION

LIQUIDACION

EXPEIENTE TECNICO

% DE AVANCE MENSUAL

TOTAL

8,351,647.97

304,202.46

123,794.26

24,619.03

21,951.92

8,826,215.64

VALORIZACION SEGÚN INFORME DE CORTE Y EVALUACION

27,232.12

1,003.87

408.52

81.24

72.44

28,798.19

0.33%

VALORIZACION MENSUAL MES DE SETIEMBRE 2011 SEGUN PRESUPUESTO BASE

76,233.41

2,768.24

1,126.53

224.03

199.76

80,551.97

0.91%

VALORIZACION MENSUAL MES DE SETIEMBRE 2011 POR MAYORES METRADOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE SETIEMBRE 2011 POR PARTIDAS VINCULANTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE SETIEMBRE 2011 POR PARTIDAS NUEVAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

176,820.54

6,449.09

2,624.44

521.92

865.38

187,281.37

2.12%

VALORIZACION MENSUAL MES DE OCTUBRE 2011 POR MAYORES METRADOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE OCTUBRE 2011 POR PARTIDAS VINCULANTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE OCTUBRE 2011 POR PARTIDAS NUEVAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

346,038.95

12,593.98

5,125.08

1,019.23

908.81

365,686.05

4.14%

VALORIZACION MENSUAL MES DE NOVIEMBRE 2011 POR MAYORES METRADOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE NOVIEMBRE 2011 POR PARTIDAS VINCULANTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE NOVIEMBRE 2011 POR PARTIDAS NUEVAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE DICIEMBRE 2011 SEGUN PRESUPUESTO BASE

95,282.07

3,467.91

1,411.25

280.66

250.25

100,692.14

1.14%

VALORIZACION MENSUAL MES DE DICIEMBRE 2011 POR MAYORES METRADOS

15,345.75

0.00

0.00

0.00

0.00

15,345.75

0.17%

VALORIZACION MENSUAL MES DE DICIEMBRE 2011 POR PARTIDAS VINCULANTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE DICIEMBRE 2011 POR PARTIDAS NUEVAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE OCTUBRE 2011 SEGUN PRESUPUESTO BASE

VALORIZACION MENSUAL MES DE NOVIEMBRE 2011 SEGUN PRESUPUESTO BASE

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

VALORIZACION MENSUAL MES DE ENERO 2012 SEGUN PRESUPUESTO BASE

118,745.49

4,289.25

1,745.50

347.12

309.52

125,436.88

1.42%

VALORIZACION MENSUAL MES DE ENERO 2012 POR MAYORES METRADOS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE ENERO 2012 POR PARTIDAS VINCULANTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE ENERO 2012 POR PARTIDAS NUEVAS

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

75,516.34

1,095.13

445.66

88.63

79.03

77,224.78

0.87%

VALORIZACION MENSUAL MES DE FEBRERO 2012 POR MAYORES METRADOS

0.00

2,558.56

1,119.74

0.00

0.00

3,678.31

0.04%

VALORIZACION MENSUAL MES DE FEBRERO 2012 POR PARTIDAS VINCULANTES

0.00

0.00

0.00

0.00

0.00

0.00

0.00%

VALORIZACION MENSUAL MES DE FEBRERO 2012 POR PARTIDAS NUEVAS

0.00

7,210.36

2,566.72

0.00

0.00

9,777.08

0.11%

931,214.67

41,436.39

16,573.44

2,562.83

2,685.19

994,472.52

11.25%

7,420,433.30

262,766.07

107,220.82

22,056.20

19,266.73

7,831,743.12

11.15%

13.62%

13.39%

10.41%

12.23%

11.27%

VALORIZACION MENSUAL MES DE FEBRERO 2012 SEGUN PRESUPUESTO BASE

VALORIZACION ACUMUL. SALDO % DE AVANCE ACUMUL.

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

RESUMEN DE VALORIZACIONES ACUMULADO OBRA: META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA:

001 SEDE PUNO

VALORIZACION N° :

COMPONENTE: FUENTE DE FINANCIAMIENTO: UBICACIÓN: MODALIDAD DE EJECUCIÓN:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA RECURSOS DETERMINADOS COPANI-ZEPITA; COPANI-ZEPITA; YUNGUYO-CHUCUITO JULI; PUNO ADMINISTRACION DIRECTA

ING. RESIDENTE: ING. SUPERVISOR: FECHA DE INICIO: PLAZO DE EJECUCION:

DESCRIPCION TOTAL PRESUPUESTO

AVANCE PORCENTUAL

PRESUPUESTO TOTAL 8,826,215.64

8 MARCO ANTONIO ALIAGA ARPASI WILBER MAMANI APAZA 23-09-2011 FECHA DE TERMINO: 21-12-2011 90 DIAS CALENDARIO

VALORIZACIONES MENSUALES DIC-2011

ENERO

777,955.48

125,436.90

100.00%

RESIDENTE DE OBRA

8.81%

FEBRERO

1.42%

90,680.16

1.03%

MARZO

ABRIL

MAYO

JUNIO

JULIO

AGOSTO

TOTAL

-

-

-

-

-

-

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

SUPERVISOR DE OBRA

994,072.54

11.26%

SALDO POR VALORIZAR 7,832,143.10

88.74%

DIAGRAMA DE BARRAS GANTT MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

OBRA: COMPONENTE:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

FUENTE DE FINANCIAMIENTO: RECURSOS ORDINARIOS - DONACIONES Y TRANSFERENCIAS UBICACIÓN: DISTR-PROV.-REGIYUNGUYO COPANI - CHUCUITO JULI - PUNO MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA

11.26%

12.00% 10.00% 8.00% 6.00% 3.52% 4.00% 1.03%

2.00%

Programado Ejecutado Fisico Ejecutado Valorizado

0.00% FEBRERO

ING.

ING.

CIP. N°

CIP. N°

SUPERVISOR DE OBRA

RESIDENTE DE OBRA

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt 03/19/2020

68

AVANCE FISICO FINANCIERO OBRA:

“MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S – ZEPITA”

COMPONENTE : 00002 CONCLUSION MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA TRAMO II YUNGUYO COPANI KM 18+000 AL KM 31+140

FUENTE DE FINANCIAMIENTO: 5 RECURSOS DETERMINADOS UBICACIÓN:

DISTR.:

FISICO VS REGION: FINANCIERO PUNO

PROV.:

MODALIDAD DE EJECUCIÓN: ADMINISTRACION DIRECTA

PRESUPUESTO TOTAL 8'826,215.64 1.60%

1.40%

187,593.54 1.20%

135,738.60 1.00%

PORCENTAJE

0.80%

0.60%

0.40%

0.20%

MES

0.00% FEBRERO

Ejecutado Financiero Ejecutado Fisico

ING.

ING.

CIP. N°

CIP. N°

SUPERVISOR DE OBRA

RESIDENTE DE OBRA

GOBIERNO REGIONAL PUNO GRISGOEM2011.allt

03/19/2020

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

GRAFICO DE CONTROL DE VALORIZACIONES COMPONENTE : 00002 CONCLUSION MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA TRAMO II YUNGUYO COPANI KM 18+000 AL KM 31+140

MES

AVANCE FINANCIERO

AVANCE (%)

AVANCE FISICO AVANCE PROGRAMADO

100.00% 90.00%

89.01%

80.00% 70.00% 60.00% 53.33%

50.00% 40.00% 30.00% 20.00% 10.00%

0.00%

2011

2011

Inicio de Obra DICIEMBRE

J

J

A

D

Año Mes

GOBIERNO REGIONAL PUNO GRISGOEM2011-allt

16.50%

10.23%

0.00%

In

0.00%

27.20%

17.27% 14.92%15.74% 14.59% 8.64% 11.06%12.36%

2012

2012

2012

2012

2012

2012

2012

ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

JULIO

SALDO

Presup. Ejecutado (Valorización Mensual) Acum. Presup. Ejecutado (Valorizacion Mensual) Acum.

S/. %

0.00 0.00

762,611.13 8.64%

125,436.90 10.23%

90,680.16 12.36%

Presup. Ejecutado (Ejecución Financiera) Acum.

S/.

0.00 1,316,571.45

72,386.73

135,738.60

91.36% 7,437,257.46

Presup. Ejecutado (Ejecucion Financiera) Acum.

%

0.00

15.74%

17.27%

84.26%

14.92%

03/19/2020

7,938,167.61

68

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

CONTROL DE RECURSO MANO DE OBRA (CD) PROYECTO: UBICACIÓN: FECHA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA RESIDENTE: MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISSUPERVISOR: FEBRERO - 2012 Recurso

Programado HH

2011

ING. MARCO ANTONIO ALIAGA ARPASI ING. WILBER MAMANI APAZA

2012

Diciembre

Enero

Febrero

Marzo

Abril

Mayo

Junio

Julio

Agosto

Septiembre

Acumulado

saldo

TOPOGRAFO/NIVELADOR

0.00

-

-

-

-

-

-

-

-

-

-

-

0.00

OPERADOR DE EQUIPO PESADO

0.00

-

-

-

-

-

-

-

-

-

-

-

0.00

OPERADOR DE EQUIPO LIVIANO

0.00

-

-

-

-

-

-

-

-

-

-

-

3,697.31

-

-

-

-

-

-

-

-

-

OPERARIO

4390.25

0.00

3,697.31

692.94

OFICIAL

13825.78

1,796.37

-

-

-

-

-

-

-

-

-

1,796.37

12029.41

PEON

46689.81

18,407.40

-

-

-

-

-

-

-

-

-

18,407.40

28282.41

Recurso

Programado S/

2011

2012

Diciembre

TOPOGRAFO/NIVELADOR

0.00

-

OPERADOR DE PLANTA DE ASFA

0.00

-

OPERADOR DE EQUIPO PESADO

0.00

OPERADOR DE EQUIPO LIVIANO OPERARIO

0.00 23751.25

OFICIAL PEON TOTAL

24,257.85

Enero

Febrero

2,733.48 4,632.76

19,807.82

Marzo

Mayo

Junio

Julio

Agosto

Septiembre

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

13,563.76

5,034.66

Abril

-

-

-

-

-

-

-

8,644.22

-

-

-

-

-

-

-

Acumulado 2,733.48 42,454.37 -

saldo -2733.48 0.00 -42454.37 0.00

33,486.70

-9735.45

69128.90

9,935.84

1,238.72

2,619.38

-

-

-

-

-

-

-

13,793.94

55334.96

213839.31

151,534.90

25,298.24

19,609.09

-

-

-

-

-

-

-

196,442.23

17397.08

306719.46

205,536.41

38,937.86

44,436.45

-

-

-

-

-

-

-

288,910.72

17808.74

-

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

CONTROL DE RETRIBUCION DE GASTOS GENERALES MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA RESIDENTE: MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL SUPERVISOR: FEBRERO - 2012

PROYECTO: UBICACIÓN: FECHA:

Recurso

Programado Meses

2011

ING. MARCO ANTONIO ALIAGA ARPASI ING. WILBER MAMANI APAZA

2012

Diciembre

Enero

Febrero

Marzo

Abril

Mayo

Junio

Julio

Agosto

Septiembre

Acumulado

saldo

RESIDENTE DE OBRA

3.00

2.00

-

-

-

-

-

-

-

-

-

2.00

1.00

ASISTENTE ADMINISTRATIVO

3.00

6.00

2.00

-

-

-

-

-

-

-

-

8.00

-5.00

ASISTENTE TECNICO

3.00

5.00

2.00

-

-

-

-

-

-

-

-

7.00

-4.00

ING. ESPECIALISTA EN SUELOS Y PAVIMEN

3.00

3.00

1.00

-

-

-

-

-

-

-

-

4.00

-1.00

MAESTRO DE OBRA

3.00

2.00

1.00

-

-

-

-

-

-

-

-

3.00

0.00

TOPOGRAFO

3.00

2.00

1.00

-

-

-

-

-

-

-

-

3.00

0.00

AUXILIAR DE LABORATORIO DE SUELOS

3.00

1.00

-

-

-

-

-

-

-

-

-

1.00

2.00

ALMACENERO

3.00

6.00

-

-

-

-

-

-

-

-

-

6.00

-3.00

GUARDIAN DE DIA

3.00

7.00

3.00

-

-

-

-

-

-

-

-

10.00

-7.00

CHOFER DE VEHICULO MENOR

3.00

5.00

1.00

-

-

-

-

-

-

-

-

6.00

-3.00

CONTROLADOR DE PERSONAL

3.00

4.00

1.00

-

-

-

-

-

-

-

-

5.00

-2.00

CONTROLADOR DE MAQUINARIA PESADA

3.00

5.00

1.00

-

-

-

-

-

-

-

-

6.00

-3.00

OPERADOR DE PLANTA

3.00

-

-

-

-

-

-

-

-

-

-

-

3.00

OPERADOR DE MAQUINARIA

3.00

1.00

-

-

-

-

-

-

-

-

-

1.00

2.00

MECANICO

6.00

1.00

-

-

-

-

-

-

-

-

-

1.00

5.00

-

1.00

-

-

-

-

-

-

-

-

1.00

-1.00

4.00

-

-

-

-

-

-

-

-

-

4.00

-4.00

ELECTRICISTA OTROS

Recurso RESIDENTE DE OBRA

2011 Programado S/

2012

Diciembre

Enero

Febrero

Mayo

Junio

Julio

Agosto

Septiembre

Acumulado

saldo

12000.00

13,833.25

-

-

-

-

-

-

-

13,833.25

-1833.25

8000.00

15,655.22

4,249.95

3,849.89

-

-

-

-

-

-

-

23,755.06

-15755.06

ASISTENTE TECNICO

8400.00

16,852.21

4,866.05

6,372.63

-

-

-

-

-

-

-

28,090.89

-19690.89

ING. ESPECIALISTA EN SUELOS Y PAVIMEN

9000.00

9,578.49

4,016.66

3,616.78

-

-

-

-

-

-

-

17,211.93

-8211.93

MAESTRO DE OBRA

5400.00

4,431.94

2,499.84

2,100.03

-

-

-

-

-

-

-

9,031.81

-3631.81

TOPOGRAFO

7500.00

4,017.48

1,032.32

2,333.49

-

-

-

-

-

-

-

7,383.29

116.71

AUXILIAR DE LABORATORIO DE SUELOS

4500.00

1,750.11

-

-

-

-

-

-

-

1,750.11

2749.89

ALMACENERO

4500.00

4,101.96

1,283.29

-

-

-

-

-

-

-

5,385.25

-885.25

GUARDIAN

3000.00

20,829.78

4,816.68

2,449.87

-

-

-

-

-

-

-

28,096.33

-25096.33

CHOFER DE VEHICULO MENOR

4500.00

9,289.52

1,800.01

1,400.02

-

-

-

-

-

-

-

12,489.55

-7989.55

CONTROLADOR DE PERSONAL

3600.00

4,284.69

2,150.11

1,749.86

-

-

-

-

-

-

-

8,184.66

-4584.66

CONTROLADOR DE MAQUINARIA PESADA

3600.00

6,280.29

1,416.20

720.67

-

-

-

-

-

-

-

8,417.16

-4817.16

OPERADOR DE PLANTA

5400.00

-

-

-

-

-

-

-

-

-

-

-

5400.00

OPERADOR DE MAQUINARIA

3600.00

-

-

-

-

-

-

-

-

-

-

-

3600.00

MECANICO

4500.00

-

-

-

-

-

-

-

-

-

1,459.38

3040.62

-

-

-

-

-

-

-

-

1,975.05

-1975.05

-

-

-

-

-

-

-

27,512.09

-27512.09

ELECTRICISTA OTROS

24,595.32

-

1,975.05 -

-

Abril

ASISTENTE ADMINISTRATIVO

1,459.38

-

Marzo

-

2,916.77

TOTAL

87500.00

136,959.64

28,822.87

28,793.30

-

-

-

-

-

-

-

194,575.81

-107075.81

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECÁNICO

CONTROL DE RETRIBUCION DE GASTOS DE SUPERVISION MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA RESIDENTE: MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDSUPERVISOR: FEBRERO - 2012

PROYECTO: UBICACIÓN: FECHA:

Recurso

Programado Meses

2011

ING. MARCO ANTONIO ALIAGA ARPASI ING. WILBER MAMANI APAZA

2012

Diciembre

Enero

Febrero

Marzo

Abril

Mayo

Junio

Julio

Agosto

Septiembre

Acumulado

saldo

SUPERVISOR DE OBRA

3.00

-

-

-

-

-

-

-

-

-

-

-

3.00

ASISTENTE DE SUPERVISION

3.00

-

-

-

-

-

-

-

-

-

-

-

3.00

INGENIERO ESPECIALISTA EN S

3.00

-

-

-

-

-

-

-

-

-

-

-

3.00

ASISTENTE ADMINISTRATIVO

3.00

-

-

-

-

-

-

-

-

-

-

-

3.00

SECRETARIA

2.00

-

-

-

-

-

-

-

-

-

-

-

2.00

Recurso SUPERVISOR DE OBRA

2011 Programado S/

2012

Diciembre

Enero

Febrero

Marzo

Mayo

Junio

Julio

Agosto

Septiembre

Acumulado

12000.00

-

-

-

-

-

-

-

-

-

7500.00

-

-

-

-

-

-

-

-

-

-

-

7500.00

INGENIERO ESPECIALISTA EN S

9000.00

-

-

-

-

-

-

-

-

-

-

-

9000.00

ASISTENTE ADMINISTRATIVO

4500.00

-

-

-

-

-

-

-

-

-

-

-

4500.00

SECRETARIA

1900.00

-

-

-

-

-

-

-

-

-

-

-

1900.00

34900.00

-

-

-

-

-

-

-

-

-

8,214.39

8,214.39

saldo

ASISTENTE DE SUPERVISION

TOTAL

8,214.39

Abril

8,214.39

3785.61

26685.61

MOVIMIENTO DIARIO DE ALMACEN OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

MES

OCTUBRE - 2011

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FUENTE DE FINANCIAMIENTO:

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

UBICACIÓN:

YUNGUYO-COPANI

FECHA DE INICIO:

9/23/2011

MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA



DESCRIPCION

1.00

COMBUSTIBLES Y LUBRICANTES

1.01

GASOLINA

UND

ALMACEN

GLN

0.00

DISTR.: YUNGUYO - COPANI

MOVIMIENTO

PROV.: YUNGUYO - CHUCUITO JULI

REGION: PUNO

PLAZO DE EJECUCION:

FECHA DE TERMINO:

7/21/2011

90 DIAS CALENDARIOS

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

INGRESO

0.00

SALIDA 1.02

PETROLEO

GLN

415.00

1.03

ADITIVO MEJORADO DE ADHERENCIA

1.04

ACEITE MOTOR 15W40 R4 API C14

1.05

ACEITE TERMICO

1.06

1.07

1.08

ACEITE MULTIGRADO 15W40 MOTOR PETROLERO

GRASA PARA LUBRICANTE MARCA VISTONY

ACEITE DE TRANSMISION MARCA SHELL SAE 90

KG

5400.00

BALDE

50.00

CILINDRO

15.00

BALDE

BALDE

BALDE

24.00

25.00

21.00

2000

2000 146

180

133

142

100

225

197

185

ACEITE MULTIGRADO 15W40 PARA CARGADOR FRO BALDE

4.00

309

330

380

195

2000 461

340

375

495

2000 342

297

460

407

ACEITE DE MOTOR 15W40 PARA MOTONIVELADORA BALDE

6.00

ACEITE TRASMISIÓN SAE 85 W140

BALDE

19.00

1.06

ACEITE DE TRASMISION SAE 80W90

BALDE

0.00

1.08

1.03

1.04

ACEITE DE MOTOR SAE 20W50 MARCA SHELL

ACEITE TRASMISIÓN SAE 90 MARCA SHELL

ACEITE MOTOR 15W40

ACEITE HIDRAULICO HI TEC 68 DILLUX

BALDE

BALDE

BALDE

BALDE

12.00

10.00

30.00

20.00

1.05

ACEITE HIDRAULICO MARCA SHELL

BALDE

29.00

1.06

ACEITE MULTIGRADO 15W40 MOTORP PARA VOLQ

BALDE

7.00

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00 4.00

1.00

1.00

0.00

2.03

HITO O POSTE KILOMETRICO DE CONCRETO

2.04

2.05

2.06

PINTURA DE TRAFICO AMARILLO TT-P-115F,TIPO II

PINTURA DE TRAFICO BLANCO TT-P-115F,TIPO II

PINTURA LATEX TIPO I

UND

GLN

GLN

GLN

14

86

86

01

2.06

ANTICORROSIVO EPOXICO

GLN

01

2.07

PINTURA ESMALTE SINTENTICO TIPO I

GLN

09

1.00

INGRESO 1.00

INGRESO 4.00

2.00

1.00

2.00

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

0.00 4.00

1.00

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00 1.00

25.00

14.00

3.00

0.00

15.00

0.00

12.00

10.00

30.00

20.00

28.00

0.00

7.00

INGRESO

SALIDA

24.00

1.00

INGRESO 2.00

15.00

4.00

INGRESO

1.00

50.00

6.00 0.00

1.00

5400.00

1.00 0.00

INGRESO

1233.00

7.00 0.00

SALIDA

MATERIALES

0.00

7,182.00

0.00

SALIDA

2.00

257

SALIDA

SALIDA

1.07

440

INGRESO

SALIDA 1.05

350

0.00

SALIDA 1.04

436

8,000.00

INGRESO

SALIDA 1.03

SALDO

0.00

INGRESO SALIDA

TOTAL

1.00

0.00

14.00

86.00

86.00

1.00

1.00

8.00

MOVIMIENTO DIARIO DE ALMACEN OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

MES

OCTUBRE - 2011

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FUENTE DE FINANCIAMIENTO:

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

UBICACIÓN:

YUNGUYO-COPANI

FECHA DE INICIO:

9/23/2011

MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA



2.10

DESCRIPCION

YESO X 28 KG.

UND

BOLSA

ALMACEN

07

DISTR.: YUNGUYO - COPANI

MOVIMIENTO

CLAVOS DE 2.1/2'' C/C

KG

21

TUBO FIERRO GALVANIZADO 3''

UND

12

2.13

TEE DE FIERRO 1 1/2''X11/2''X3/16''

UND

54

2.09

TUBERIA PVC 6''

UND

02

2.20

2.20

2.20

2.20

2.09

LAMINA REFLECTIVA DE ALTA INTENSIDAD

LAMINA REFLECTIVA GRADO INGENIERIA

LAMINA REFLECTIVA DE ALTA INTENSIDAD COLOR

FIBRA DE VIDRIO DE 4MM ACABADO

TUBERIA PVC 6''

M2

M2

M2

M2

UND

07

05

05

09

02

2.11

ALAMBRE DE CONSTRUCCION REC. Nº 16

KG

100

2.02

THINNER ESTANDAR

GLN

05

MADERA TORNILLO 1 1/2" x 8" x 10'

UND

00

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

MADERA TORNILLO 2" x 2" x 10'

UND

00

1.00

2.00

1.00

1.00

2.00

0.00 1.00

2.00

3.00

1.00

1.00

1.00

2.00

2.00

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00 2.00

0.00

SALIDA

0.00

MADERA TORNILLO 2" x 3" x 10'

UND

00

INGRESO

100.00

100.00

100.00

100.00

2.20

MADERA TORNILLO 2" x 4" x 10'

3.00

REPUESTOS Y ACCESORIOS PARA MAQUINARIA Y EQUIPO

UND

3.01

LLANTAS (POSTERIOR DE LONA PARA VOLQUETE M

UND

00

00

3.02

LLANTAS (DELANTERA DE LONA PARA VOLQUETE

UND

42

3.03

LLANTAS (POSTERIOR DE LONA PARA MOTONIVELA

UND

08

3.04

3.05

3.06

3.07

3.08

SOLVENTE

ANTICORROSIVO EPOXICO

FILTRO DE PETROLEO PARA VOLQUETE MACK MOD

FILTRO DE ACEITE PARA VOLQUETE MACK MODELO

FILTRO DE AIRE COD 5545HD

3.09

FILTRO DE ACEITE DE MOTOR COD. 1R-0739

3.10

FILTRO DE PETROLEO COD 1R 0750

3.11

3.12

FILTRO HIDRAULICO FZ 1F180K001A

FILTRO DE ACEITE DE MOTOR COD. 20539275

GLN

GLN

UND

UND

JUEGO

00

00

12

12

00

JUEGO

01

UND

01

JUEGO

UND

01

32

12.00

54.00

2.00

7.00

5.00

5.00

9.00

2.00

98.00

100.00

100.00

100.00

100.00

5.00

100.00

0.00 100.00

0.00

SALIDA INGRESO

8.00

2.00

INGRESO

INGRESO

0.00

13.00

INGRESO

INGRESO

SALDO

7.00

SALIDA 2.20

TOTAL 0.00

SALIDA 2.20

7/21/2011

1

INGRESO

SALIDA

2.20

FECHA DE TERMINO:

90 DIAS CALENDARIOS

INGRESO

SALIDA 2.12

REGION: PUNO

PLAZO DE EJECUCION:

SALIDA 2.08

PROV.: YUNGUYO - CHUCUITO JULI

100.00

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

100.00

0.00

42.00

8.00

0.00

0.00

12.00

12.00

0.00

1.00

1.00

1.00

32.00

MOVIMIENTO DIARIO DE ALMACEN OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

MES

OCTUBRE - 2011

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FUENTE DE FINANCIAMIENTO:

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

UBICACIÓN:

YUNGUYO-COPANI

FECHA DE INICIO:

9/23/2011

MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA



3.13

DESCRIPCION

LIQUIDO DE FRENO MARCA FREMOSA.

UND

GLN

ALMACEN

19

DISTR.: YUNGUYO - COPANI

MOVIMIENTO

PROV.: YUNGUYO - CHUCUITO JULI

REGION: PUNO

PLAZO DE EJECUCION:

FECHA DE TERMINO:

7/21/2011

90 DIAS CALENDARIOS

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

TOTAL

INGRESO

0.00

SALIDA

0.00

SALDO

19.00

MOVIMIENTO DIARIO DE ALMACEN OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

MES

OCTUBRE - 2011

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FUENTE DE FINANCIAMIENTO:

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

UBICACIÓN:

YUNGUYO-COPANI

FECHA DE INICIO:

9/23/2011

MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA



3.14

3.15

3.16

DESCRIPCION

FILTRO DE ACEITE DE MOTOR COD. 1R-0762

FILTRO DE PETROLEO COD. 0986 B01019 BOSCH

FILTRO DE PETROLEO COD.1R-1807 CAT 140

UND

UND

UND

UND

ALMACEN

01

03

02

3.17

FILTRO DE AIRE PRIMARIO COD. 245-637/245-6355

UND

02

3.02

FILTRO HIDRAULICO COD. P165332 PARA RODILLO

UND

04

3.03

3.04

3.05

3.06

3.07

FILTRO DE AIRE COD.P778905/P778906 PARA RODI JUEGO

FILTRO DE ACEITE DE MOTOR COD.3970

FILTRO DE PETROLEO COD. FF5421

FILTRO DE PETROLEO COD.FS19732 PARA RODILLO

FILTRO DE AIRE SECUNDARIO COD.245-6375/245-6

UND

UND

UND

UND

04

02

04

00

02

3.08

CUCHILLAS CANTONERAS 8 INCLUYE PERNOS

JUEGO

00

3.09

ESCOBILLONES DE PLASTICO NACIONAL

UND

98

3.10

ESCOBAS DE PAJA NACIONAL

UND

100

3.11

3.12

3.13

3.14

UÑAS DE CUCHARON PARA EXCAVADORA KOBELC

FILTRO DE AIRE COD.57MD320M

CORREA DE VENTILADOR COD.20886339

FILTRO DE ACEITE DE MOTOR COD. 20539275

UND

JUEGO

UND

UND

05

05

12

35

3.15

FILTRO DE PETROLEO CODIGO 20972295

UND

54

3.16

FILTRO DE PETROLEO RACORD COD. 6.45.042

UND

33

3.17

3.02

3.03

3.04

3.05

FILTRO DE CAJA DE DIRECCIÓN COD. 87068A

FILTRO DE ACEITE DE MOTOR COD. LF9001 LF 550

FILTRO DE PETROLEO RACORD COD.FS1029 LF908

FILTRO DE PETROLEO PARA VOLQUETE S600-4X6 2

FILTRO DE ACEITE PARA VOLQUETE S600-4X6. FS 1

UND

UND

UND

UND

UND

12

20

19

07

09

3.06

FILTRO DE ACEITE 84167233 PARA CARGADOR FRO

UND

04

3.07

FILTRO DE PETROLEO MODELO W190B

UND

01

3.08

3.09

3.10

RETEN RUEDA POSTERIOR PARA VOLQUETE

FILTRO DE ACEITE DE MOTOR COD.LF16015

FILTRO DE PETROLEO COD. FF5428 LF 16015

UND

UND

UND

06

03

03

DISTR.: YUNGUYO - COPANI

MOVIMIENTO INGRESO

PROV.: YUNGUYO - CHUCUITO JULI

REGION: PUNO

PLAZO DE EJECUCION:

FECHA DE TERMINO:

7/21/2011

90 DIAS CALENDARIOS

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

TOTAL 0.0

SALIDA

0.0

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.0

SALIDA

0.0

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALDO

1.00

3.00

2.00

2.00

4.00

4.00

2.00

4.00

0.00

2.00

0.00

98.00

100.00

5.00

5.00

12.00

35.00

54.00

33.00

12.00

20.00

19.00

7.00

9.00

4.00

1.00

6.00

3.00

3.00

MOVIMIENTO DIARIO DE ALMACEN OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

MES

OCTUBRE - 2011

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FUENTE DE FINANCIAMIENTO:

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

UBICACIÓN:

YUNGUYO-COPANI

FECHA DE INICIO:

9/23/2011

MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA

N° 3.10

DESCRIPCION FILTRO DE PETROLEO COD. FF5428 LF 16015

UND

ALMACEN

UND

03

DISTR.: YUNGUYO - COPANI

MOVIMIENTO SALIDA

PROV.: YUNGUYO - CHUCUITO JULI

REGION: PUNO

PLAZO DE EJECUCION:

FECHA DE TERMINO:

7/21/2011

90 DIAS CALENDARIOS

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

TOTAL

SALDO 3.00

0.00

MOVIMIENTO DIARIO DE ALMACEN OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

MES

OCTUBRE - 2011

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FUENTE DE FINANCIAMIENTO:

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

UBICACIÓN:

YUNGUYO-COPANI

FECHA DE INICIO:

9/23/2011

MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA



3.11

3.12

3.13

DESCRIPCION

FILTRO RACORD COD. 2RO127177C

FILTRO DE AIRE COD.3520401C1/3560734C1.

FILTRO DE AIRE COD.5545HD.MARCA LYS.

3.14

FILTRO DE PETROLEO COD. LP170/1700.

3.15

FILTRO DE ACEITE COD.L2927 TIPO ELEMENTO

3.16

3.17

3.02

3.03

3.04

FILTRO DE ACEITE DE MOTOR COD.466334.

FILTRO DE PETROLEO COD.466987.

FILTRO DE ACEITE COD. LF9 MARCA LYS

FILTRO DE ACEITE COD.LF1

FILTRO DE GASOLINA MARCA LYS

3.05

FILTRO DE AIRE COD.AF10089.

3.06

FILTRO DE AIRE COD. 61-0273-610274 MOTONIVE

3.07

3.08

3.09

3.10

3.11

FILTRO DE ACEITE COD.1R-0739 CAT 140H

FILTRO DE PETROLEO 1R-0750 CAT 140H

CUCHILLAS CANTONERAS Y SOBRE DE 8'' PARA M

FILTRO DE AIRE COD. 8501334/8501333 W190B

FILTRO DE ACEITE DE MOTOR COD. 87803260

UND

UND

JUEGO

JUEGO

ALMACEN

03

01

01

JUEGO

01

UND

01

UND

UND

UND

UND

UND

02

00

01

02

00

UND

02

JUEGO

03

UND

UND

JUEGO

JUEGO

UND

03

01

00

02

03

3.12

FILTRO DE PETROLEO COD. 87803197

UND

03

3.13

FILTRO DE PETROLEO RACORD COD.87435525

UND

02

3.14

3.15

3.16

3.17

FILTRO HIDRAULICO COD.87308944

FILTRO TRASMISIÓN COD.0501323154ZF

PERNO C/ CUAD. DE 3/8'' X 3''

PERNO5/8''X4'' CON CABEZA CUADRADA

UND

UND

PIEZA

PIEZA

02

04

36

07

DISTR.: YUNGUYO - COPANI

MOVIMIENTO

PROV.: YUNGUYO - CHUCUITO JULI

REGION: PUNO

PLAZO DE EJECUCION:

FECHA DE TERMINO:

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

FILTRO DE AIRE 245-6376/245-6355

JUEGO

00

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.0

SALIDA

0.0

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.0

SALIDA

0.0

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

INGRESO

FILTRO DE PETROLEO 326-1644 P. MOTO N.

UND

00

3.04

FILTRO DE PETROLEO 1R 1807 P. MOTO N.

UND

00

INGRESO

3.00

6.00 1.00

6.00

UND

00

INGRESO

3.02

FILTRO DE ACEITE DE MOTOR PARA V. VOLVO LY

UND

00

3.03

FILTRO DE PETROLEO PARA V. VOLVO LYS

UND

00

6.00 1.00

4.00

SALIDA INGRESO

1.00

1.00

1.00

2.00

0.00

1.00

2.00

0.00

2.00

3.00

3.00

1.00

0.00

2.00

3.00

3.00

2.00

2.00

4.00

36.00

7.00

3.00

5.00

6.00

0.00 6.00

SALIDA INGRESO

1.00

1.00 6.00

SALIDA FILTRO DE ACEITE DE MOTOR 1R 0762 P. MOTO. N

3.00

0.00 6.00

SALIDA INGRESO

SALDO

0.00 3.00

SALIDA 3.03

TOTAL

INGRESO

SALIDA 3.02

7/21/2011

90 DIAS CALENDARIOS

5.00

1.00 4.00

4.00

0.00 4.00

4.00

4.00

MOVIMIENTO DIARIO DE ALMACEN OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

MES

OCTUBRE - 2011

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FUENTE DE FINANCIAMIENTO:

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

UBICACIÓN:

YUNGUYO-COPANI

FECHA DE INICIO:

9/23/2011

MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA

N° 3.03

DESCRIPCION FILTRO DE PETROLEO PARA V. VOLVO LYS

UND

ALMACEN

UND

00

DISTR.: YUNGUYO - COPANI

MOVIMIENTO SALIDA

PROV.: YUNGUYO - CHUCUITO JULI

REGION: PUNO

PLAZO DE EJECUCION:

FECHA DE TERMINO:

7/21/2011

90 DIAS CALENDARIOS

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

TOTAL

SALDO 4.00

0.00

MOVIMIENTO DIARIO DE ALMACEN OBRA:

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – EMP R3S - ZEPITA

META:

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

UNIDAD EJECUTORA :

001 SEDE PUNO

MES

OCTUBRE - 2011

COMPONENTE :

MEJORAMIENTO DE LA CARRETERA YUNGUYO – COPANI – ZEPITA

ING. RESIDENTE:

ING. MARCO ANTONIO ALIAGA ARPASI

FUENTE DE FINANCIAMIENTO:

DONACIONES Y TRANSFERENCIAS

ING. SUPERVISOR:

ING. WILBER MAMANI APAZA

UBICACIÓN:

YUNGUYO-COPANI

FECHA DE INICIO:

9/23/2011

MODALIDAD DE EJECUCIÓN:

ADMINISTRACION DIRECTA



3.04

DESCRIPCION

UÑAS DE LAMPON DE CARGADOR FRONTAL

UND

UNIDAD

ALMACEN

00

DISTR.: YUNGUYO - COPANI

MOVIMIENTO INGRESO

PROV.: YUNGUYO - CHUCUITO JULI

REGION: PUNO

PLAZO DE EJECUCION: S

D

L

M

M

J

V

S

D

1

2

3

4

5

6

7

8

9

HERRAMIENTAS

4.01

LIJAR

UND

01

4.02

PICO DE MANGO DE MADERA NACIONAL

UND

00

4.03

PALA TIPO CUCHARA CON MANGO DE MADERA

UND

02

4.04

CARRETILLA BUGUI CON LLANTA Y CAMARA

4.05

WINCHA DE 50 METALICA

5.00

EQUIPOS

UND

UND

08

01

5.01

5.02 6.00

PROTECCION Y SEGURIDAD

6.01

ZAPATOS DE SEGURIDAD CON PUNTA REFORZADA

6.02

6.03

6.01

6.02

ZAPATOS DE SEGURIDAD TIPO INGENIERO

BOTAS DE JEBE CON PLANTA AMARILLA

MASCARILLA DE PROTECCIÓN

CHALECOS DE SEGURIDAD

PAR

PAR

PAR

UND

UND

21

06

11

50

04

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

MASCARILLA DE PROTECCION DE POLVO

UND

00

8.00

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

INGRESO

CASCO DE SEGURIDAD PARA ING. COLOR BLANCO

UND

00

6.03

MAMELUCOS EN TELA BLUE JEANS

UND

00

INGRESO

25.00

GUANTES DE JEBE ALBAÑIL REFORZADO

UND

00

INGRESO

CASCO DE SEGURIDAD TIPO JOKEY. COLOR NARAN

UND

00

INGRESO

4.00

6.03

GUANTES DE CUEDO MANGA CORTA

UND

00

25.00

6.03

BOTAS DE JEBE CON PLANTA AMARILLA

UND

00

6.03 7.00

0.00

2.00

8.00

1.00

0.00

0.00

21.00

6.00

11.00

50.00

4.00

25.00

25.00

18.00

24.00

1.00 25.00

3.00 25.00

9.00

7.00 25.00

1.00 25.00

1.00

16.00 25.00

7.00

SALIDA INGRESO

1.00

4.00 25.00

16.00

SALIDA INGRESO

5.00

25.00

SALIDA 6.03

0.00

0.00 5.00

SALIDA 6.03

0.00

0.00 25.00

SALIDA INGRESO

SALDO

8.00

INGRESO

SALIDA 6.03

TOTAL 8.00

SALIDA 6.03

7/21/2011

10 8.00

SALIDA

4.00

FECHA DE TERMINO:

90 DIAS CALENDARIOS

22.00

3.00 25.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

INGRESO

0.00

SALIDA

0.00

25.00

0.00

UTILES DE ESCRITORIO 00

00

0.00

0.00

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECANICO

RESUMEN DE MOVIMIENTO DE ALMACEN VALORIZADO DE OBRA AL 30 SETIEMBRE 2011

OBRA

: MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI - EMP R3S - ZEPITA

META

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

ENTIDAD EJECUTORA

: GOBIERNO REGIONAL

MES

: SETIEMBRE - 2011

2 2.3 2.3.1 PARTIDA ESPECIFICA

GASTOS PRESUPUESTARIOS BIENES Y SERVICIOS

INGRESO AL SALDO ALMACEN DE EJECUCION OBRA 2010 04/07/2011

COMPRA DE BIENES O/C

2.3.16.11

DESCRIPCION

U. MEDIDA

CANTIDAD

INGRESO

EGRESO

SALDO

C.U.

EGRESO

SALDO AL 30 SET 2011

COSTO TOTAL

136,769.50

REPUESTOS Y ACCESORIOS

900968

LLANTAS (POSTERIOR DE LONA PARA VOLQUETE MACK)

UNIDAD

12.00

12.00

12.00

-

1550.00

900968

LLANTAS (DELANTERA DE LONA PARA VOLQUETE MACK)

UNIDAD

48.00

48.00

6.00

42.00

1490.00

62,580.00

900968

LLANTAS (POSTERIOR DE LONA PARA MOTONIVELADORA

UNIDAD

8.00

8.00

5.00

3.00

2550.00

7,650.00

900925

SOLVENTE

GALON

-

-

-

-

31.80

900926

ANTICORROSIVO EPOXICO

GALON

1.00

1.00

-

1.00

37.80

37.80

900931

FILTRO DE PETROLEO PARA VOLQUETE MACK MODELO GRANITE

UNIDAD

12.00

12.00

-

12.00

159.00

1,908.00

900931

FILTRO DE ACEITE PARA VOLQUETE MACK MODELO GRANITE

UNIDAD

12.00

12.00

-

12.00

59.00

708.00

900934

FILTRO DE AIRE COD 5545HD

JUEGO

-

-

-

-

347.00

900934

FILTRO DE ACEITE DE MOTOR COD. 1R-0739

JUEGO

1.00

1.00

-

1.00

134.00

900934

FILTRO DE PETROLEO COD 1R 0750

UNIDAD

1.00

1.00

1.00

-

168.80

900934

FILTRO HIDRAULICO FZ 1F180K001A

JUEGO

1.00

1.00

-

1.00

484.00

484.00

900935

FILTRO DE ACEITE DE MOTOR COD. 20539275

UNIDAD

32.00

32.00

-

32.00

114.80

3,673.60

900938

LIQUIDO DE FRENO MARCA FREMOSA.

GLN

20.00

20.00

1.00

19.00

474.80

9,021.20

900938

FILTRO DE ACEITE DE MOTOR COD. 1R-0762

UNIDAD

3.00

3.00

2.00

1.00

194.50

194.50

900938

FILTRO DE PETROLEO COD. 0986 B01019 BOSCH

UNIDAD

4.00

4.00

-

4.00

214.80

859.20

900938

FILTRO DE PETROLEO COD.1R-1807 CAT 140

UNIDAD

3.00

3.00

1.00

2.00

85.70

171.40

900938

FILTRO DE AIRE PRIMARIO COD. 245-637/245-6355

UNIDAD

2.00

2.00

-

2.00

238.00

476.00

900939

FILTRO HIDRAULICO COD. P165332 PARA RODILLO

UNIDAD

4.00

4.00

-

4.00

107.00

428.00

900939

FILTRO DE AIRE COD.P778905/P778906 PARA RODILLO

JUEGO

4.00

4.00

-

4.00

284.00

1,136.00

900939

FILTRO DE ACEITE DE MOTOR COD.3970

UNIDAD

3.00

3.00

1.00

2.00

91.00

182.00

900939

FILTRO DE PETROLEO COD. FF5421

UNIDAD

4.00

4.00

-

4.00

134.00

536.00

900939

FILTRO DE PETROLEO COD.FS19732 PARA RODILLO

UNIDAD

2.00

2.00

-

2.00

164.00

328.00

900944

FILTRO DE AIRE SECUNDARIO COD.245-6375/245-6355

UNIDAD

2.00

2.00

-

2.00

381.50

763.00

900944

CUCHILLAS CANTONERAS 8 INCLUYE PERNOS

JUEGO

1.00

1.00

1.00

-

4269.00

900940

ESCOBILLONES DE PLASTICO NACIONAL

UNIDAD

100.00

100.00

2.00

98.00

900940

ESCOBAS DE PAJA NACIONAL

UNIDAD

100.00

100.00

-

100.00

9.90

990.00

900945

UÑAS DE CUCHARON PARA EXCAVADORA KOBELCO

UNIDAD

5.00

5.00

-

5.00

754.60

3,773.00

900945

FILTRO DE AIRE COD.57MD320M

JUEGO

5.00

5.00

-

5.00

364.80

1,824.00

900945

CORREA DE VENTILADOR COD.20886339

UNIDAD

12.00

12.00

-

12.00

144.90

1,738.80

900945

FILTRO DE ACEITE DE MOTOR COD. 20539275

UNIDAD

35.00

35.00

-

35.00

58.00

2,030.00

900946

FILTRO DE PETROLEO CODIGO 20972295

UNIDAD

54.00

54.00

-

54.00

164.90

8,904.60

900947

FILTRO DE PETROLEO RACORD COD. 6.45.042

UNIDADD

34.00

34.00

1.00

33.00

64.90

2,141.70

900947

FILTRO DE CAJA DE DIRECCIÓN COD. 87068A

UNIDAD

12.00

12.00

-

12.00

234.80

2,817.60

900947

FILTRO DE ACEITE DE MOTOR COD. LF9001 LF 5507

UNIDAD

20.00

20.00

-

20.00

125.00

2,500.00

900947

FILTRO DE PETROLEO RACORD COD.FS1029 LF908

UNIDAD

19.00

19.00

-

19.00

64.90

1,233.10

900948

FILTRO DE PETROLEO PARA VOLQUETE S600-4X6 20539275

UNIDAD

7.00

7.00

-

7.00

127.00

889.00

900948

FILTRO DE ACEITE PARA VOLQUETE S600-4X6. FS 1040

UNIDAD

9.00

9.00

-

9.00

149.50

1,345.50

900948

FILTRO DE ACEITE 84167233 PARA CARGADOR FRONTAL

UNIDAD

4.00

4.00

-

4.00

109.80

439.20

900948

FILTRO DE PETROLEO MODELO W190B

UNIDAD

3.00

3.00

2.00

1.00

119.80

119.80

900949

RETEN RUEDA POSTERIOR PARA VOLQUETE

UNIDAD

6.00

6.00

-

6.00

284.80

1,708.80

900949

FILTRO DE ACEITE DE MOTOR COD.LF16015

UNIDAD

3.00

3.00

-

3.00

134.80

404.40

900949

FILTRO DE PETROLEO COD. FF5428 LF 16015

UNIDAD

3.00

3.00

-

3.00

123.50

370.50

900949

FILTRO RACORD COD. 2RO127177C

UNIDAD

3.00

3.00

-

3.00

77.80

233.40

900949

FILTRO DE AIRE COD.3520401C1/3560734C1.

JUEGO

1.00

1.00

-

1.00

274.70

274.70

900949

FILTRO DE AIRE COD.5545HD.MARCA LYS.

JUEGO

1.00

1.00

-

1.00

147.80

147.80

900949

FILTRO DE PETROLEO COD. LP170/1700.

JUEGO

1.00

1.00

-

1.00

114.80

114.80

900949

FILTRO DE ACEITE COD.L2927 TIPO ELEMENTO

UNIDAD

1.00

1.00

-

1.00

74.70

74.70

900949

FILTRO DE ACEITE DE MOTOR COD.466334.

UNIDAD

2.00

2.00

-

2.00

37.80

75.60

900949

FILTRO DE PETROLEO COD.466987.

UNIDAD

-

-

-

-

35.00

900949

FILTRO DE ACEITE COD. LF9 MARCA LYS

UNIDAD

1.00

1.00

-

1.00

13.80

13.80

900949

FILTRO DE ACEITE COD.LF1

UNIDAD

2.00

2.00

-

2.00

13.90

27.80

900949

FILTRO DE GASOLINA MARCA LYS

UNIDAD

-

-

-

-

8.00

900949

FILTRO DE AIRE COD.AF10089.

UNIDAD

2.00

2.00

-

2.00

74.00

148.00

900950

FILTRO DE AIRE COD. 61-0273-610274 MOTONIVELADORA

JUEGO

3.00

3.00

-

3.00

286.80

860.40

900950

FILTRO DE ACEITE COD.1R-0739 CAT 140H

UNIDAD

3.00

3.00

-

3.00

74.80

224.40

900950

FILTRO DE PETROLEO 1R-0750 CAT 140H

UNIDAD

1.00

1.00

-

1.00

94.80

94.80

900950

CUCHILLAS CANTONERAS Y SOBRE DE 8'' PARA MOTONIVELADORA

JUEGO

-

-

-

-

8.90

3860.00

-

-

134.00 -

872.20

-

-

-

PARTIDA ESPECIFICA

O/C

DESCRIPCION

U. MEDIDA

CANTIDAD

INGRESO

SALDO AL 30 SET 2011

EGRESO

900950

FILTRO DE AIRE COD. 8501334/8501333 W190B

JUEGO

2.00

2.00

-

2.00

374.50

749.00

900950

FILTRO DE ACEITE DE MOTOR COD. 87803260

UNIDAD

4.00

4.00

1.00

3.00

96.00

288.00

PARTIDA ESPECIFICA

O/C

DESCRIPCION

U. MEDIDA

CANTIDAD

INGRESO

SALDO AL 30 SET 2011

EGRESO

900950

FILTRO DE PETROLEO COD. 87803197

UNIDAD

3.00

3.00

-

3.00

149.80

449.40

900950

FILTRO DE PETROLEO RACORD COD.87435525

UNIDAD

3.00

3.00

1.00

2.00

134.70

269.40

900950

FILTRO HIDRAULICO COD.87308944

UNIDAD

2.00

2.00

-

2.00

327.00

654.00

900950

FILTRO TRASMISIÓN COD.0501323154ZF

UNIDAD

4.00

4.00

-

4.00

495.00

1,980.00

900923

PERNO C/ CUAD. DE 3/8'' X 3''

PIEZA

36.00

36.00

-

36.00

28.80

1,036.80

900923

PERNO5/8''X4'' CON CABEZA CUADRADA

PIEZA

36.00

36.00

-

36.00

28.80

1,036.80

900924

LAMINA REFLECTIVA DE ALTA INTENSIDAD

M2

7.00

7.00

-

7.00

179.00

1,253.00

900924

LAMINA REFLECTIVA GRADO INGENIERIA COLOR VERDE

M2

5.00

5.00

-

5.00

99.00

495.00

900924

LAMINA REFLECTIVA ALTA INTENSIDAD COLOR BLANCO

M2

5.00

5.00

-

5.00

179.00

895.00

900924

FIBRA DE VIDRIO DE 4MM ACABADO

M2

-

-

-

-

309.00

2.3.13.13

214,665.60

GRASA PARA LUBRICANTE 900970

ADITIVO MEJORADO DE ADHERENCIA

5,400.00

5,400.00

-

5,400.00

16.80

90,720.00

900970

ACEITE MOTOR 15W40 R4 API C14

BALDE

50.00

50.00

-

50.00

255.00

12,750.00

900970

ACEITE TERMICO

CILIND

15.00

15.00

-

15.00

2490.00

37,350.00

900931

ACEITE MULTIGRADO 15W40 MOTOR PETROLERO PARA VOLQUETE

BALDE

24.00

24.00

-

24.00

279.00

6,696.00

900932

GRASA PARA LUBRICANTE MARCA VISTONY

BALDE

25.00

25.00

25.00

259.50

6,487.50

900933

ACEITE DE TRANSMISION MARCA SHELL SAE 90

BALDE

24.00

24.00

3.00

21.00

259.80

5,455.80

900934

ACEITE MULTIGRADO 15W40 PARA CARGADOR FRONTAL

BALDE

4.00

4.00

-

4.00

279.80

1,119.20

900934

ACEITE DE MOTOR 15W40 PARA MOTONIVELADORA CATERPILLAR

BALDE

6.00

6.00

6.00

279.80

1,678.80

900936

ACEITE TRASMISIÓN SAE 85 W140

BALDE

99.00

99.00

99.00

237.80

23,542.20

900936

ACEITE DE TRASMISION SAE 80W90

BALDE

900936

ACEITE DE MOTOR SAE 20W50 MARCA SHELL

BALDE

13.00

13.00

1.00

12.00

237.00

2,844.00

900937

ACEITE TRASMISIÓN SAE 90 MARCA SHELL

BALDE

10.00

10.00

-

10.00

277.80

2,778.00

900937

ACEITE MOTOR 15W40

BALDE

30.00

30.00

-

30.00

249.80

7,494.00

900938

ACEITE HIDRAULICO HI TEC 68 DILLUX

BALDE

20.00

20.00

-

20.00

285.80

5,716.00

900943

ACEITE HIDRAULICO MARCA SHELL

BALDE

30.00

30.00

1.00

29.00

278.90

8,088.10

900948

ACEITE MULTIGRADO 15W40 MOTORP PARA VOLQUETE

BALDE

15.00

15.00

8.00

7.00

278.00

1,946.00

2 . 3 . 1 11 1 1

KILOGRAMO

-

-

-

-

235.80

-

1,136.20

HERRRAMIENTAS

900925

LIJAR

UNIDAD

3.00

3.00

2.00

1.00

2.20

900942

PICO DE MANGO DE MADERA NACIONAL

UNIDAD

8.00

8.00

8.00

-

30.80

900942

PALA TIPO CUCHARA CON MANGO DE MADERA

UNIDAD

25.00

25.00

23.00

2.00

27.80

55.60

900942

CARRETILLA BUGUI CON LLANTA Y CAMARA

UNIDAD

10.00

10.00

2.00

8.00

134.80

1,078.40

2.3.16.14

2.20 -

4,196.60

DE SEGURIDAD

900941

ZAPATOS DE SEGURIDAD CON PUNTA REFORZADA

PAR

25.00

25.00

4.00

21.00

69.80

1,465.80

900941

ZAPATOS DE SEGURIDAD TIPO INGENIERO

PAR

8.00

8.00

2.00

6.00

284.80

1,708.80

900941

BOTAS DE JEBE CON PLANTA AMARILLA

PAR

30.00

30.00

19.00

11.00

24.80

272.80

900941

MASCARILLA DE PROTECCIÓN

UNIDAD

50.00

50.00

-

50.00

11.80

590.00

900941

CHALECOS DE SEGURIDAD

UNIDAD

13.00

13.00

9.00

4.00

39.80

2.3.111 1

159.20 20,921.31

PARA EDIFICIOS Y ESTRUCTRURAS

900925

WINCHA DE 50 METALICA

UNIDAD

5.00

5.00

4.00

1.00

89.00

900925

THINNER ESTANDAR

GALON

5.00

5.00

-

5.00

15.80

79.00

900925

HITO O POSTE KILOMETRICO DE CONCRETO

UNIDAD

14.00

14.00

-

14.00

139.00

1,946.00

900926

PINTURA DE TRAFICO AMARILLO TT-P-115F,TIPO II

GALON

87.00

87.00

1.00

86.00

49.50

4,257.00

900926

PINTURA DE TRAFICO BLANCO TT-P-115F,TIPO II

GALON

88.00

88.00

2.00

86.00

49.50

4,257.00

900926

PINTURA LATEX TIPO I

GALON

1.00

1.00

-

1.00

21.80

21.80

900926

PINTURA ESMALTE SINTENTICO TIPO I

GALON

10.00

10.00

1.00

9.00

29.80

268.20

900923

CLAVOS DE 2.1/2'' C/C

KILOGRAMO

29.00

29.00

8.00

21.00

4.95

103.95

900981

TUBERIA PVC 6''

UNIDAD

2.00

2.00

-

2.00

140.00

280.00

900923

YESO X 28 KG.

BOLSA

27.00

27.00

7.00

8.48

59.36

901002

ALAMBRE DE CONSTRUCCION REC. Nº 16

KILOGRAMO

100.00

100.00

-

100.00

4.10

410.00

900981

TUBO FIERRO GALVANIZADO 3''

UNIDAD

12.00

12.00

-

12.00

317.00

3,804.00

900981

TEE DE FIERRO 1 1/2''X11/2''X3/16''

UNIDAD

54.00

54.00

-

54.00

99.00

5,346.00

MOVIMIENTO DE ALMACEN VALORIZADO DE OBRA AL 30 SETIEMBRE 2011

20.00

89.00

377,689.21

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECANICO

RESUMEN MENSUAL DE MOVIMIENTO DE COMBUSTIBLES PETROLEO (DIESSEL- B5)

O/C

OBRA

: MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI - EMP R3S - ZEPITA

META

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

ENTIDAD EJECUTORA

: GOBIERNO REGIONAL

MES

: SETIEMBRE - 2011

DESCRIPCION (Especificaciones Técnicas)

ITEM

COMBUSTIBLE Y LUBRICANTES

CONDUCTOR

GLN.

PETROLEO

GLN

1

RODILLO ANNMAN

2

CISTERNA HINO

3

VOLQUETE MACK

Z1I-835

4

VOLQUETE INTERNATIONAL

Z1S-865

5

RODILLO VAP

6

CAMIONETA

PGH 478

7

CISTERNA DE COMBUSTIBLE

EGA 927

8

MOTOBOMBA DE AGUA

9

MOTONIVELADORA CAT

10

CARGADOR FRONTAL

11

CAMIONETA TOYOTA

12

COMBI ASISTENTE TECNICO

13

VOLQUETE MACK

SALD. ANTER.

INGRESO SETIEMBR E

MOVIMIENTO (SALIDAS) MES DE SETIEMBRE - 2011 TOTAL INGRES

J V S D L M M J V S D L M M J V S D L M M 1

2

3

4

5

6

7

8

SALIDA TOTAL MES

J

V

S

D

L

M

M

J

V

9 10 11 12 13 14 15 16 17 18 19 20 21 22

23

24

25

26

27

28

29

30

PLACA

GASOLINA DE 84 OCTANOS

900588

UND.

0.00

905.00

0.00

2,000.00

SALDO ACTUAL

1,129.00

1,776.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2,905.00

1,129.00

1,776.00

ASC 110

20

60.00

10

10

10

10

25

20

10

20

15

20

15

20

145.00

20

20

10

15

20

20

10

20

135.00

15

15

10

40.00

10

10

10

75.00

5

60.00

5

20.00

R.55

10

10

10

25

15 30

0.00 5

VHP 190

50

PU 2175

5

Z1I-844

10

50

5

5 25

5

5

45

45

50

45

45

355.00

4

25

30

25

35

119.00

5

5

5

5

35.00 0.00

TOTAL

110

60 130

85

114

225

15 165

135

165

NOTA: LOS DIAS QUE NO TIENEN SALIDA EN EL PRESENTE CUADRO LAS MAQUINARIAS TRABAJARON EN EL TRAMO I.

-----------------------------------------------------

-----------------------------------------------------

------------------------------------

------------------------------------

ING.

ING.

NOMBRE:

NOMBRE:

CIP.

CIP.

ALMACENERO DE OBRA

ASIST. ADMINISTRATIVO

INGENIERO SUPERVISOR DE OBRA

INGENIERO RESIDENTE DE OBRA

DNI.

DNI.

85.00

GOBIERNO REGIONAL PUNO GERENCIA REGIONAL DE INFRAESTRUCTURA SUB GERENCIA DE OBRAS Y EQUIPO MECANICO

RESUMEN MENSUAL DE HORAS MAQUINA Y EQUIPOS OBRA

: MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI - EMP R3S - ZEPITA

META

MEJORAMIENTO DE LA CARRETERA YUNGUYO COPANI ZEPITA KILOMETRO: 12,010 PUNO YUNGUYO MULTIDISTRITAL

ENTIDAD EJECUTORA

: GOBIERNO REGIONAL

MES

: SETIEMBRE - 2011

HORAS MAQUINA MES DE SETIEMBRE DESCRIPCION



PLACA

TOTAL MES

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

2:00

8:00

4:45

2:15

4:45

6:06

6:00

6:45

4:00

5:45

5:00

6:30

6:30

2:30

2:30

4:30

4:06

1:00

4:15

1:45

6:15

6:15

6:15

4:00

5:00

116:42:00

9:00

5:00

9:00

8:00

7:00

9:00

9:00

3:00

7:00

8:00

9:00

3:00

8:00

7:00

6:00

6:00

2:00

6:00

4:00

7:00

5:00

6:00

143:00:00

1

Motoniveladora CAT

2

Rodillo AMMAN ASC 110

3

VOLQUETE MACK

Z1I-835

4

VOLQUETE INTERNATIONAL

Z1S-865

0:00:00

5

RODILLO VAP

R.55

0:00:00

6

CAMIONETA

PGH 478

0:00:00

7

CISTERNA DE COMBUSTIBLE

EGA 927

8

MOTOBOMBA DE AGUA

ASC 110

9 MOTONIVELADORA CAT 10 CARGADOR FRONTAL

VHP 190

11 CAMIONETA TOYOTA 12 COMBI ASISTENTE TECNICO

PU 2175

13 VOLQUETE MACK

Z1I-844

0.00

0:00:00 3:00

1:45

2:45

2:45

2:30

3:00

3:15

1:15

5:45

2:30

4:00

8:30

0:00

4:15

7:30

3:30

3:00

4:00

3:00

2:00

2:00

2:00

3:00

3:00

6:00

3:00

4:00

2:30

1:45

3:00

1:15

1:00

2:30

3:00

2:30

3:30

0:00

2:30

1:30

2:45

2:30

2:30

53:00:00

7:00

7:00

7:00

66:30:00

0:00:00 5:00

9:30 3:00

3:00

2:00

2:00

2:00

3:00

3:00

49:00:00

4:00

0:00:00 6:00

4:00

2:00

5:00

10:00

TOTAL HORAS MAQUINAS

40:00:00 468:12:00

NOTA: EL RESTO DE LA MAQUINARIA QUE APARECE EN EL CUADRO SE AFECTO AL TRAMO I

-----------------------------------------------------

-----------------------------------------------------

------------------------------------

------------------------------------

ING.

ING.

NOMBRE:

NOMBRE:

CIP.

CIP.

ALMACENERO DE OBRA

ASIST. ADMINISTRATIVO

INGENIERO SUPERVISOR DE OBRA

INGENIERO RESIDENTE DE OBRA

DNI.

DNI.