SCHEDULE OF DRAWING – BHEL, HYDERABAD C& I Sl.No. 1.
DRAWING NO 1-00-620-50802
2.
1-00-620-50802
3.
1-00-620-50800
4.
1-00-620-50799
5.
1-00-620-50804
6.
1-00-620-50801
7.
2-62-209-50543
8
3-95-291-13739
9
3-95-291-13740
10
3-95-291-13741 TO 3-95-29113747 3-95-291-13748
11 12 13
3-95-291-13749 & 3-95-29113750 3-95-291-13751
14
740100547
15
740100548
16 17
740100549 740100550
18
31810055100 /01
19 20
11800055364-ER 11800055365-ER
21
11800055366-ER
22
21810054524-ER
DESCRIPTION P&I DIAGRAM FOR GIRTH GEAR GREASING FUNCTION P&I DIAGRAM FOR LUBRICATING CIRCUIT OF MILL BEARING P&I DIAGRAM FOR STEAM INERTING SYSTEM P&I DIAGRAM FOR MAIN REDUCER LUBRICATING SYSTEM P&I DIAGRAM FOR TUBE MILL MOTOR DRIVE SCHEME P&I DIAGRAM FOR DELTA ‘P’ LEVEL CONTROL & PIPING P&I DIAGRAM FRO SCREW MONITORING SYSTEM MILL FIRE PROTECTION SYSTEM LIST OF DRGS. MILL FIRE PROTECTION SYSTEM CABINATE ARRANGEMENT DIAG. MILL FIRE PROTECTION SYSTEM PANEL ELEMENTARY DIAGRAM
STATUS A
MILL FIRE PROTECTION SYSTEM PANEL BILL OF MATERIAL MILL FIRE PROTECTION SYSTEM EXTERNAL CONNECTION DIAGRAM
NA
MILL FIRE PROTECTION SYSTEM INTERNAL ARRANGEMENT DIAGRAM FUNCTION & MEASURING POINT DIAGRAM FOR R16K 550.1 ( 5 SHEETS ) LIST OF INSTRUMENTS FOR R 16 K 550.1 (3 SHEETS ) TERMINAL PLAN FOR RTD TERMINAL PLAN FOR TRANSMITTER & SWITCHES WIRING DIAGRAM FOR CEP SET JUNCTION BOXES PID OF FEED WATER LINES FOR BFP SET PID OF SEALING & COOLING WATER LINES FOR BFP SET PID OF LUB OIL & WORKING OIL SYSTEM FOR BFP SET INSTRUMENTATION SHCEME FOR CEP
NA
A A A A A A NA NA NA
NA
A A A A A A A A A
23
21800054604-ER
24
31810055097-ER
25
FP10664
26
FP10667
27 28
FP10668 /01 FP10669 /00
29 30
FP10670 /00 FP10671 /02
31
FP10672 /01
32
FP10673 /02
33
FP10708 /01
34 35 36
FP10533 /02 FP10663 /01
NA-not available at site
(EN5J40//500 ) LGB & LIR INSTRUMENTATION CONNECTIO DETAILS OF BFP SET LGB & LIR INSTRUMENTATION CONNECTIO DETAILS OF CEP SEQUENTIAL INTERLOCKING CONDITIONS FOR CONDENSATE EXTRACTION PUMP AUXILIARY C. W. & INSTRUMENT AIR REQUIREMENT FOR BFP & CEP SCHEDULE OF MOTORS FOR BFP & CEP SCHEDULE OF SOLENOID VALVES OF BFP & CEP SCHEDULE OF ACTUATORS FOR BFP LIST OF RECOMMENDED ANNUNCIATION & TRIPS FOR BFP SET LIST OF RECOMMENDED ANALOG INPUTS TO OWNERS DDCMIS OF CEP LIST OF RECOMMENDED ANALOG INPUTS TO OWNERS DDCMIS OF BFP SET SEQUENTIAL INTERLOCKING CONDITIONS FOR BFP SET INSTRUMENT SCHEDULE FOR BFP SET INSTRUMENT SCHEDULE FOR CEP SET
A A A A A A A A A A A A A
A-
available at site