ENGINEERING & PROJECT IMPLEMENTATION MANUAL DELIVERABLES LIST JOB NAME CLIENT LOCATION SUBJECT
FC BSD BSD 21 JULY 2010
SIZE
2,1
: : : :
Project Execution Plan Document & Equipment Numbering Procedure Project Control Plan Document Approval Procedure Invoicing Procedure Change Order Procedure Project Correspondence and Coordination Procedure
A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot
1 1 1 1 1 1 1
HSE
Health and Safety Management Plan Environmental Management Plan Emergency Response Plan Job Hazard Analysis HSE Disposal Handling Job Safety Analysis
A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot
1 1 1 1 1 1
QA/QC
Quality Assurance Plan QA/QC Plan General Welding Procedure Welding and Welder Qualification Test Procedure NDT Procedure Handover Procedure Pipe Handling and Transportation Procedure Inspection and Test Plan For Civil Material Inspection and Test Plan For Piping Material Inspection and Test Plan For Instrument Inspection and Test Plan For Electrical Inspection and Test Plan For Offshore Pipeline Inspection and Test Plan For Mechanical Equipment Inspection and Test Plan For Field Joint Coating Inspection and Test Plan For Insulation & Coating Inspection and Test Plan For Pipelaying Barge And Other Offshore Spread Inspection and Test Plan For Onshore and Shore Crossing Equipment WPS & PQR For Pipeline WPS & PQR For Pipeline and Piping WPS & PQR For Steel Structure WPS List And Welding Map
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
ENGINEERING
List of Engineering Data Book Engineering Quality Plan Engineering List Of Relevant Codes and Standards Engineering Procedure
A4 A4 A4 A4
lot lot lot lot
1 1 1 1
PROCUREMENT
Procurement & Subcontracting Plan Procurement & Logistik Monitoring
A4 A4
lot lot
1 1
CONSTRUCTION ENGINEERING PROCEDURE
Construction Execution Plan Pipeline Installation Procedure Riser Lifting and Installation Procedure Contigency Procedure (Dry and Wet Buckle) Anchor Handling and Mooring Procedures Preconstruction Survey Procedure As Laid Survey Procedure ROV Operation Procedure Pilot Drill and Reaming HDD Procedure Pullback Pipeline Procedures Offshore Loading and Unloading Procedure Diving Operation Procedures Pig Launcher Installation Procedure Demolish Procedure Field Joint Coating and Infill Procedure Bolt and Nut Tightening Procedure Survey And Positioning Procedure Personnel Transfer Procedure Concrete Weight Coating Stripping off Procedure Pipeline Flooding Procedure Trenching and backfiling Procedure Towing Procedure Loading Procedure Pressure Test Procedure for Piping on ORF Fabrication Procedure for Piping at ORF Post Trenching Procedure Instrument Calibration, Inspection and test procedure
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Process Flow Diagram Heat and Mass Balance
A3 A4
sheet Sheet
4 1
P&ID Muara Karang ORF Legend and Sysmbols P&ID Muara Karang ORF Pig Receiver P&ID Muara Karang ORF Filter P&ID Muara Karang ORF Pressure Letdown and Metering skid P&ID Muara Karang ORF Indirect and Fire ed Water Bath Heater P&ID Muara Karang ORF Pressure Letdown and Metering skid ( PGN ) P&ID Muara Karang ORF Cold Vent System P&ID Muara Karang ORF Instrument Air Compressor P&ID Muara Karang ORF Instrument Air Dryer P&ID Muara Karang ORF Instrument Air Receiver P&ID Muara Karang ORF Potable Water System P&ID Muara Karang ORF Emergency Diesel Generator P&ID Muara Karang ORF Fire Water Pump and Main Ring P&ID Muara Karang ORF Spray system
A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3
Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet Sheet
3 1 1 1 1 1 1 1 1 1 1 1 2 1
Muara karang ORF Utility Consumption Report Muara karang ORF Line Sizing Muara karang ORF Relief System, Radiation and Dispersion Study Report
A4 A4 A4
lot lot lot
1 1 1
WBS GROUP
PROJECT IMPLEMENTATION MANUAL PROJECT MANAGEMENT
2
By Chkd Appvd Date
UNIT
NO
1
: LNG TERMINAL FLOATING : PT. NUSANTARA REGAS : MUARA KARANG : DELIVERABLE LIST
DOC. NO.
DESCRIPTION
QTY
ENGINEERING PROCESS ENGINEERING PFD & MATERIAL BALANCE
PIPING & INSTRUMENTATION DIAGRAM
CALCULATION AND STUDY
ENGINEERING & PROJECT IMPLEMENTATION MANUAL DELIVERABLES LIST JOB NAME CLIENT LOCATION SUBJECT
WBS GROUP
By Chkd Appvd Date
: : : :
FC BSD BSD 21 JULY 2010
SIZE
NO
: LNG TERMINAL FLOATING : PT. NUSANTARA REGAS : MUARA KARANG : DELIVERABLE LIST
UNIT
Hydraulic Calculation PSV Load Calculation HAZOP & Report Capacity Limitation Study Corosion Study
A4 A4 A4 A4 A4
lot lot lot lot lot
1 1 1 1 1
Equipment List Line List (Index) Instrument Setting Point List SAFE Chart Process Description & Operating Philosophy
A4 A4 A4 A4 A4
lot lot lot lot lot
1 1 1 1 1
Operation Manual ORF Precommissioning Procedure Pipeline Precommissioning Procedure Commissioning Procedure
A4 A4 A4 A4
lot lot lot lot
1 1 1 1
Process Data Sheet For Pig Receiver Process Data Sheet For Filter Process Data Sheet For Indirect Fired Water Bath Heater Process Data Sheet For Instrument Air Compressor Package Process Data Sheet For Instrument Air Dryer Package Process Data Sheet For Instrument Air Receiver Process Data Sheet For Potable Water Storgae Tank Process Data Sheet For Potable Water Pump Process Data Sheet For Metering Package Process Data Sheet For Vent Package Process Data Sheet ForFire Water Pump Process Data Sheet ForJockey Fire Water Pump
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
Set Set Set Set Set Set Set Set Set Set Set Set
1 2 1 1 1 1 1 2 1 1 2 2
Process Datasheet for PSV Process Datasheet for Control Valve Process Datasheet for PCV Process Datasheet for Pressure Transmitter Process Datasheet for Level Transmitter / Gauge Process Datasheet for RO Process Datasheet for SDV
A4 A4 A4 A4 A4 A4 A4
Set Set Set Set Set Set Set
4 4 4 9 4 3 4
Fire Water Requirement Calculation Layouts of Junction Main Cable and Juntion Box All Area Layouts of Fire and Gas System Field Wiring For Building Area Layouts of Fire and Gas System Field Wiring For Non Building Area Layouts of Fire Water Pump Fire and Gas Detection Wiring Diagram Fire and Gas Detection Loop Diagram Fire and Gas Detection Interlock Diagram Fire and Gas Detection Cable Schedule Fire and Gas Detection Cable Drum Schedule Fire and Gas Detection MTO Fire and Gas Equipment datasheet Fire Fighting Equipment datasheet Safety Equipment List
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
Set Set Set Set Set Set Set Set Set Set Set Set Set Set
1 1 3 3 1 3 3 3 2 2 1 5 5 1
Requisition for Fire Water & Jockey Pump Requisition for Fire Fighting Equipment Requisition for Fire and Gas Detection Equipment TBE for Fire and Gas Detection Equipment TBE for Fire Water Pumps TBE for Fire Fighting Equipment
A4 A4 A4 A4 A4 A4
Set Set Set Set Set Set
1 1 2 1 1 1
ORFLline Flushing / Blowing ORF Compressor Run Testing ORF Pump Run Testing ORF Fire Protection Equipment Functional Testing ORF Fire Fighting Equipment Performance Testing Pipeline Precommissioning
A4 A4 A4 A4 A4 A4
Lot Lot Lot Lot Lot Lot
1 1 6 1 1 1
Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical Electrical
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1
DOC. NO.
DESCRIPTION
QTY
GENERAL
Procedure
PROCESS DATA SHEET FOR EQUIPMENT
PROCESS DATA SHEET FOR INSTRUMENT
PROCESS SAFETY ENGINEERING
REQUISITION , TBE, CLARICATION, VENDOR PRINT CHECK
PRECOMMISSIONING / COMMISSIONING WORKS
2,2
ELECTRICAL ENGINEERING BASIC DESIGN DOCUMENT Specification
Specification 400VAC Switchgear MCC Specification for Power Transformer Distribution Specification for AC UPS System General Specification Specification for Grounding & Lightning Protection Specification for Surge Arrester Construction Specification Specification for Power and Control Cables Specification for Lighting and Receptacle Panel Specification for Lightning Arrester of Insulation Joint
Standard Drawing
Electrical Standard Detail Installation Electrical Legend & Symbol
A3 A3
sheet sheet
15 2
Data Sheet
Data Sheet for Power Transformer Data Sheet for 400VAC Switchgear MCC Data Sheet for AC UPS
A4 A4 A4
lot lot lot
1 1 1
Requisition Requisition Requisition Requisition Requisition Requisition
A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot
1 1 1 1 1 1
REQUISITION & MTO AND TBE Requisition Equipment / Material
for for for for for for
Power Transformer 400VAC Switchgear MCC AC UPS Cable & Wire Electrical Cable Tray Lighting & Receptacle Panel
ENGINEERING & PROJECT IMPLEMENTATION MANUAL DELIVERABLES LIST JOB NAME CLIENT LOCATION SUBJECT
WBS GROUP
Technical Bid Evaluation (TBE)
2,3
By Chkd Appvd Date
: : : :
FC BSD BSD 21 JULY 2010
SIZE
NO
: LNG TERMINAL FLOATING : PT. NUSANTARA REGAS : MUARA KARANG : DELIVERABLE LIST
UNIT
Requisition for Lighting Fixture and Receptacle Requisition for Electrical Building Material Requisition for Electrical Bulk Material
A4 A4 A4
lot lot lot
1 1 1
TBE TBE TBE TBE TBE TBE TBE TBE TBE
A3 A3 A3 A3 A3 A3 A3 A3 A3
lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1
DOC. NO.
DESCRIPTION
for for for for for for for for for
Power Transformer 400VAC Switchgear MCC AC UPS Cable & Wire Electrical Cable Tray Lighting & Receptacle Panel Lighting Fixture and Receptacle Electrical Building Material Electrical Bulk Material
QTY
ELECTRICAL SYSTEM CALCULATION & ANALISYS
Electrical Load Data Calculation Generator Capacity Calculation Voltage Drop Calculation Short Circuit Calculation Cable Size Calculation Illumination Level Calculation Cable Tray Calculation Relay Coordination Study Transformer sizing calculation Grounding calculation
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1
DETAIL DESIGN
Hazardous Area Classification Drawing - Muara Karang Station Single Line Diagram - Muara Karang Station Power and Control Wiring Layout (General) Equipment and Base Frame Layout Cable Tray Layout for Control Building Power and Control Wiring Layout for Control Building Power and Control Wiring Layout Street Lighting Wiring Layout Lighting, Receptacle and AC Wiring Layout Lighting and Receptacle Wiring Layout (General) Lighting and Receptacle Wiring Layout for Control Building Lighting and Receptacle Wiring Layout for Building-building Cable Schedule for Lighting & Receptacle Grounding & Lightning Protection Wiring Layout (General) Grounding Wiring Layout for Control Building Lightning Protection Wiring Layout for Control Building Panel Schedule for Lighting, Receptacle, Space Heater and AC Panel Connection Diagram - Muara Karang Station Cable Schedule for Power & Control
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A3 A1 A1 A1 A3 A3 A3
sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet lot sheet sheet sheet lot lot lot
2 1 1 1 1 1 1 1 4 1 1 1 1 1 1 1 1 1 1
Piping Design Specification Piping Material Specification Piping Standard Drawing Piping Standard Support Basis For Piping Thermal Expansion Stress Analysis Piping 3D Model Preparation Procedure Piping Color Code Identification Procedure Piping Material Identification Specification Data Sheet Insulting Joint Data Sheet Barred Tee Data Sheet Spring Support Data Sheet Valve
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1
EXECUTION PROCEDURE
Piping Engineering Document List Piping Design Control Procedure Design Practice For Piping Information Drawing Design Practice For Drafting Procedure Of Piping Lay-Out Drawing Design Practice For Drafting Procedure Of Isometric Drawing Design Practice Of Pipe Support General Specification For Coating And Wrapping Of U/G Steel Pipe Engineering Procedure For Piping Mto 3D Model Rules For Piping
A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1
CONSTRUCTION SPECIFICATION
Fabrication And Installation Of Piping General Requirement For Pipe Welding In Field Construction Control Manual Of Welder & Welding Material In Field Construction Pressure Test Procedure For Piping Bolting Procedure For High Pressure Flange Joint
A4 A4 A4 A4 A4
lot lot lot lot lot
1 1 1 1 1
REQUISITION DOCUMENT
Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
1 1 1 1 1 1 1 1 1 1
A4
lot lot lot lot lot lot lot lot lot lot lot lot
PIPING ENGINEERING PIPING DESIGN SPECIFICATION
Underground Piping Work Above Ground Piping Work Tie - In Piping Work For Pipe For Valve For Flange For Gasket For Bolt & Nut For Fitting For Pipe Support Material For Spring Support For Inner/Outer Coating For U/G Pipe
A4
1 1
PLOT PLAN
General Plot Plan
A1
sheet
1
DRAWING AREA INDEX
Drawing Area Index
A1
sheet
1
PIPING ARRANGEMENT DRAWING
Piping Piping Piping Piping Piping Piping Piping
A1 A1 A1 A1 A1 A1 A1
sheet sheet sheet sheet sheet sheet sheet
1 1 1 1 1 1 1
Arrangement Drawing For Pig Receiver Area Arrangement Drawing For Utilities Area Arrangement Drawing For Metring Area Arrangement Drawing For Fire Water Bath Heater Area Section And Detail Drawing For Pig Receiver Area Section And Detail Drawing For Utilities Area Section And Detail Drawing For Metering Area
ENGINEERING & PROJECT IMPLEMENTATION MANUAL DELIVERABLES LIST JOB NAME CLIENT LOCATION SUBJECT
FC BSD BSD 21 JULY 2010
ISOMETRIC DRAWING
Isometric Drawing For Pig Receiver Area Isometric Drawing For Utilities Area Isometric Drawing For Metering Area
A3 A3 A3
sheet sheet sheet
25 25 20
PIPE SUPPORT DRAWING
Support Style List For Pig Receiver Area Support Style List For Utilities Area Support Style List For Metering Area
A4 A4 A4
sheet sheet sheet
35 20 25
Balance Material Pipe Material Class Report Material Line Report Summary Of Mto
A4 A4 A4 A4
lot lot lot lot
1 1 1 1
Carbon Steel Carbon Steel Carbon Steel Carbon Steel Gasket Bolt & Nut Carbon Steel
A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot
1 1 1 1 1 1 1
A4 A4 A4
lot lot lot
1 1 1
A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot
1 1 1 1 1 1 1
BILL OF QUANTITY
SPECIAL
DOC. NO.
DESCRIPTION
Pipe Gate Valve Ball Valve Flange
Fitting -- 1St Mto
Insulating Joint Barred Tee Spring Support Vendor Vendor Vendor Vendor Vendor Vendor Vendor
TEST BLOCK DIAGRAM
Test Block Diagram
A3
sheet
33
PIPE STANCHION SUPPORT INFORMATION
Information Drawing For Pipe Stanchion Pig Receiving Area Information Drawing For Pipe Stanchion Utilities Area Information Drawing For Pipe Stanchion Metering Area
A3 A3 A3
sheet sheet sheet
1 1 1
LOCAL FOUNDATION INFORMATION
Information Drawing For Local Foundation Of Pig Receiving Area Information Drawing For Local Foundation Of Utilities Area Information Drawing For Local Foundation Of Metering Area
A3 A3 A3
sheet sheet sheet
1 1 1
STRESS ANALISYS CALCULATION
Stress Analisys Calculation Receiving Gas Line Stress Analisys Calculation Kicker Line Stress Analisys Calculation Metering Line
A3 A3 A3
sheet sheet sheet
1 1 1
Pile Lay Out Foundation Lay Out Fenching Lay Out Underground Composite Lay Out Road ,Pavement and Graveling Sewer,Drainage and Trenching
A1 A1 A1 A1 A1 A1
sheet sheet sheet sheet sheet sheet
2 2 3 4 4 6
FACILITY
Control Room Building Fire Water Bath Heater Sales Gas Meter Skid Air Compressor & Dryer Emergency Diesel Generator Filter Cold Vent Portable Water tank Pipe Support & Lokal Foundation Pipe Sleeper
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet
25 10 4 4 4 4 2 3 4 3
DOCUMENTS
Requisition Civil Design Basis Standard Drawing Specification Shop Drawing As built Dwg
A4 A4 A3 A4 A3 A1
Set Set Set Set Set Set
17 1 42 23 50 84
Pile Calculation Foundation Calculation Fenching Lay Out & Detail Underground Composite Lay Out Road ,Pavement and Graveling Sewer,Drainage and Trenching HVAC Plumbing
A4 A4 A4 A4 A4 A4 A4 A4
Set Set Set Set Set Set Set Set
1 9 4 2 3 3 4 3
Control Room Building Fire Water Bath Heater Sales Gas Meter Skid Air Compressor & Dryer Emergency Diesel Generator Filter Cold Vent Portable Water tank Pipe Support & Lokal Foundation Pipe Sleeper
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
Set Set Set Set Set Set Set Set Set Set
4 3 2 1 3 1 1 1 1 1
CIVIL ENGINEERING DETAIL DRAWING GENERAL
FACILITY
INSTRUMENTATION ENGINEERING SPECIFICATION
Print Print Print Print Print Print Print
Check Check Check Check Check Check Check
For For For For For For For
Valve Flange Gasket Fitting Pipe Support Material Spring Hanger Special Items
QTY
VENDOR PRINT CHECK
CALCULATION GENERAL
2,5
: : : :
UNIT
WBS GROUP
MATERIAL TAKE OFF & BILL OF QUANTITY MTO REPORT
2,4
By Chkd Appvd Date
SIZE
NO
: LNG TERMINAL FLOATING : PT. NUSANTARA REGAS : MUARA KARANG : DELIVERABLE LIST
ENGINEERING & PROJECT IMPLEMENTATION MANUAL DELIVERABLES LIST JOB NAME CLIENT LOCATION SUBJECT
WBS GROUP
By Chkd Appvd Date
DOC. NO.
DESCRIPTION
QTY
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1
STANDARD DRAWING
Typical Drawing for Instrument Installation Work Instrument Boundary Work With Mechanical Instrument Boundary Work With Civil Instrument Boundary Work With Electrical Instrument Boundary Work With Piping Symbol and Index for Instrument Installation Drawing Standard Drawing for Orifice Plate and Flange Overall System Architecture
A3 A3 A3 A3 A3 A1 A3 A3
lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1
INDIVIDUAL SPECIFICATION
Ind. Ind. Ind. Ind. Ind. Ind. Ind. Ind. Ind. Ind. Ind.
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
Set Set Set Set Set Set Set Set Set Set Set
2 2 2 2 2 6 7 6 10 3 2
Control Valves RestrictionPlate PSV Shut Down Valve
A4 A4 A4 A4
Set Set Set Set
6 2 6 7
Instrument Loop Diagram Instrument Index Instrument I/O List Instrument Connection List Interlock Logic Diagram Instrument Nozzle Arrangement/ Vessel Sketch
A3 A3 A4 A4 A3 A3
Set Set Set Set Set Set
15 2 2 20 5 5
LAY OUT
Lay Lay Lay Lay Lay
A1 A1 A1 A1 A1
Set Set Set Set Set
4 3 3 3 1
INSTRUMENT HOOK-UP
Instrument Hook-Up Pressure Lead Piping Instrument Hook-Up Air Piping & Tubing
A3 A3
Set Set
20 15
CABLE SCHEDULE
Instrument Cable Schedule for Process Unit & Control Room
A3
Set
3
MATERIAL TAKE OFF
MTO MTO MTO MTO
A4 A4 A4 A4
lot lot lot lot
1 1 1 1
REQUISITION
Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition Requisition
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TBE
TBE TBE TBE TBE TBE TBE TBE TBE TBE TBE TBE TBE TBE TBE TBE TBE
A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
DETAIL ENGINEERING DETAIL DRAWING
for for for for for for for for for for for
Calculation Calculation Calculation Calculation
Out Out Out Out Out
of of of of of
for for for for
for for for for for for for for for for for for for for for for
Instrument Calibration, Inspection dan Test Procedure Cable Ladder, Tray, Fabrication Material & Accessories Instrument Signal, Power, Control Cable & Grounding Cable ICSS Instrument Design Junction Box CCTV System Metering System Pressure Let Down Skid Fiber Optic & Accessories
UNIT
General General General General General General General General General General
Spec. Spec. Spec. Spec. Spec. Spec. Spec. Spec. Spec. Spec. Spec.
for for for for for for for for for for
FC BSD BSD 21 JULY 2010
GENERAL SPECIFICATION
CALCULATION
Specification Specification Specification Specification Specification Specification Specification Specification Specification Specification
: : : :
SIZE
NO
: LNG TERMINAL FLOATING : PT. NUSANTARA REGAS : MUARA KARANG : DELIVERABLE LIST
Magnetic Level Gauge c/w Transmitter Top Mounted Level Transmitter Ultrasonic Flowmeter Restriction Orifice Plate Temperature Transmitters c/w Thermo Element &Thermowell Control Valve c/w Accessories Shut Down Valve PSV MOV Pressure & Pressure Differential Transmitter Pressure & Pressure Differential Indicator
for for for for
Field Instrument Location Plan Instrument Main Cable Way & JB Field Wiring & Grounding Instrument A/S Piping & Tubing Control Room
Instr.Hook Up Pressure Lead & Air Supply Instr.Signal, Control, Power, Grounding Cable Instr. for Cable Ladder, Tray, Fabrication Material & Accessories Instrument Junction Box, Grounding, & Wiring Accessories for for for for for for for for for for for for for for for for for for for for for
Magnetic Level Gauge c/w Transmitter Top Mounted Level Transmitter Ultrasonic Flowmeter Restriction Orifice Plate Temperature Transmitters c/w Thermo Element &Thermowell Control Valve c/w Accessories Shut Down Valve PSV MOV Pressure & Pressure Differential Transmitter Pressure & Pressure Differential Indicator ICSS CCTV System Metering System Pressure Let Down Skid Instrument Signal, Power, Control Cable & Grounding Cable Bulk Materials Instrument Wiring, Grounding & Accessories Fiber Optic and Accessories Junction Box Subcontractor
Magnetic Level Gauge c/w Transmitter Top Mounted Level Transmitter Ultrasonic Flowmeter Restriction Orifice Plate Temperature Transmitters c/w Thermo Element &Thermowell Control Valve c/w Accessories Shut Down Valve PSV MOV Pressure & Pressure Differential Transmitter Pressure & Pressure Differential Indicator ICSS CCTV System Metering System Pressure Let Down Skid Instrument Signal, Power, Control Cable & Grounding Cable
ENGINEERING & PROJECT IMPLEMENTATION MANUAL DELIVERABLES LIST JOB NAME CLIENT LOCATION SUBJECT
WBS GROUP
By Chkd Appvd Date
DOC. NO.
DESCRIPTION
TBE TBE TBE TBE TBE
2,6
for for for for for
Bulk Materials Instrument Wiring, Grounding & Accessories Fiber Optic and Accessories Junction Box Subcontractor
: : : :
FC BSD BSD 21 JULY 2010
SIZE
NO
: LNG TERMINAL FLOATING : PT. NUSANTARA REGAS : MUARA KARANG : DELIVERABLE LIST
UNIT
QTY
A3 A3 A3 A3 A3
lot lot lot lot lot
1 1 1 1 1
INTERFACE WITH OTHER DICIPLINE
Instrument Engineering Document List Instrument Construction Work Volume Interfacing w/ Compressor Package Interfacing w/ DEG Package Interfacing w/ UPS Package Interfacing w/ HVAC Package Interfacing w/Indirect Fired Water Bath Heater Package Interfacing w/ MCC Package
A4 A4 A4 A4 A4 A4 A4 A4
sheet sheet lot lot lot lot lot lot
2 8 1 1 1 1 1 1
AS BUILT DRAWING
As Built Drawing
A3
sheet
252
Pig receiver Filters Indirect fired Water Bath Heaters Cold vent tower CO2 snuffing package Air compressor & dryer package Air compressor Instrument air pre-filter Instrument air post-filter Instrument water separator Instrument air dryers Air cooler Instrument air receiver Portable water storage tank Portable water Pump Emergency Diesel Generator
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
GENERAL SPECIFICATION
Pressure Vessel Instrument air compressor and dryer package Fired water bath heater Emergency Diesel Generator Pump (non API)
A4 A4 A4 A4 A5
lot lot lot lot lot
1 1 1 1 2
CONSTRUCTION SPECIFICATION
Static Equipment Rotating Equipment Package Equipment
A4 A4 A4
lot lot lot
1 1 1
Pig receiver Filters Indirect fired Water Bath Heaters Cold vent tower CO2 snuffing package Air compressor & dryer package Air compressor Instrument air pre-filter Instrument air post-filter Instrument water separator Instrument air dryers Air cooler Instrument air receiver Portable water storage tank Portable water Pump Emergency Diesel Generator
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TBE
Pig receiver Filters Indirect fired Water Bath Heaters Cold vent tower CO2 snuffing package Air compressor & dryer package Air compressor Instrument air pre-filter Instrument air post-filter Instrument water separator Instrument air dryers Air cooler Instrument air receiver Portable water storage tank Portable water Pump Emergency Diesel Generator
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
LOADING DATA
Pig receiver Filters Indirect fired Water Bath Heaters Cold vent tower CO2 snuffing package Air compressor & dryer package Air compressor Instrument air pre-filter Instrument air post-filter Instrument water separator Instrument air dryers Air cooler Instrument air receiver Portable water storage tank Portable water Pump Emergency Diesel Generator
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
CALCULATION
Calculation of Tank
A4
lot
1
MECHANICAL ENGINEERING BASIC ENGINEERING MECHANICAL DATA SHEET
DETAIL ENGINEERING REQUISITION
ENGINEERING & PROJECT IMPLEMENTATION MANUAL DELIVERABLES LIST JOB NAME CLIENT LOCATION SUBJECT
By Chkd Appvd Date
: : : :
FC BSD BSD 21 JULY 2010
SIZE
UNIT
STANDARD DRAWING
Standard Drawing of Static Equipment
A4
lot
1
VENDOR PRINT CHECK
Pig receiver Filters Indirect fired Water Bath Heaters Cold vent tower CO2 snuffing package Air compressor & dryer package Air compressor Instrument air pre-filter Instrument air post-filter Instrument water separator Instrument air dryers Air cooler Instrument air receiver Portable water storage tank Portable water Pump Emergency Diesel Generator
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
2 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1
Basis of Design
A4
lot
1
SPECIFICATION
Line Pipe Hot Induction Bend Field Joint Coating, Infill Foam Insulation Joint Insulation Flange Gasket
A4 A4 A4 A4 A4
lot lot lot lot lot
1 1 1 1 1
ANALYSIS AND CALCULATION
Line Sizing Calculation On Bottom Stability Analysis Pipeline Expansion Analysis Calculation For Shore Crossing / HDD Design Pipeline Span Analysis Pipeline Wall Thickness Verification Line Pipe Transportation Analysis Pipelaying Analysis Pipeline Abandonment And Recovery Analysis Pipeline Dry/Wet Davit Lift Analysis Pipelay Barge Mooring Analysis Working Barge Mooring Analysis Trenching Barge Mooring Analysis Analysis Of Concrete Crushing During Pipeline Laying Lifting Analysis (Riser And Pipe Spool)
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
DETAIL DRAWING
Pipeline Drawing Index Pipeline Schematic Diagram Pipeline Overall Route 24" Import Pl & Seabed Profile 24 Inch Import Pipeline Approach At Mooring Tower Line Pipe End Detail Induction Pipe Bend Detail Typical Free Span Correction - Offshore Pipeline Riser Installation Schematic 24 Inch Riser Plan, View And Detail 24 Inch Import Pipeline Shore Approach / HDD Work Barge Anchor Pattern - Riser, Subsea Spool Installation Lay Barge Anchor Pattern Pull Back Activity Lay Barge Anchor Pattern During Initiation Approach To Mooring Tower Lay Barge Anchor Pattern During Pipeline Abandonment Lay Barge Anchor Pattern During Normal Laying Anchor Pattern Post Trenching Activity General Arrangement Plan Barge (Lay Barge) General Arrangement Plan Barge (Work Barge) General Arrangement Plan Barge (Post Trench) Stowage Plan And Loading Arrangement Pipe 24" On Material Barge Pigging And Hydrotest Equipment Layout Dewatering, Vaccum Drying And N2 Packing Equipment Layout
A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3 A3
sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet sheet
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 1 1
ALLIGNMENT SHEET
Allignment Sheet Drawing Index Bathymetry Map And Alignment Sheet 24" Import Gas Pipeline
A3 A3
sheet sheet
1 24
DATA SHEET
Line Pipe Hot Induction Bend Field Joint Coating, Infill Foam Insulation Joint Insulation Flange Gasket
A4 A4 A4 A4 A4
lot lot lot lot lot
1 1 1 1 1
RFQ
Line Pipe Coating Line Pipe Field Joint Coating Hot Induction Bend HDPU/Infill Joint Pre-Construction survey Diving Service Insulation Gasket Swivel Flange As Built Survey
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1
TBE
Line Pipe Coating Line Pipe Field Joint Coating Hot Induction Bend HDPU/Infill Joint Pre-Construction survey Diving Service Insulation Gasket Swivel Flange As Built Survey
A4 A4 A4 A4 A4 A4 A4 A4 A4 A4
lot lot lot lot lot lot lot lot lot lot
1 1 1 1 1 1 1 1 1 1
NO
2,7
: LNG TERMINAL FLOATING : PT. NUSANTARA REGAS : MUARA KARANG : DELIVERABLE LIST
WBS GROUP
PIPELINE CONSTRUCTION ENGINEERING: BASIS OF DESIGN
DOC. NO.
DESCRIPTION
QTY