TABEL 1. PERHITUNGAN VOLUME PEKERJAAN

URAIAN PEKERJAAN

NO I

PERHITUNGAN

Pekerjaan Persiapan 1. Pembersihan Lahan 15

18

Gbr. Lahan Bangunan

II

2. Pemasangan Bouwplank > pnjg tiang (4/6):100 cm > jarak antar tiang: 1 m > pnjg pemasangan bouwplank: 66 m > jlh tiang: 65

Volume Tiang = jlh tiang x Dimensi tiang = 65 x 0,04 x 0,06 x 1 = 0,156 Volume Papan = pjg bouwplank x dimesi = 66 x 0,02 x 0,1 = 0,132

1.Galian Tanah pondasi

= 1/2 (0,9 + 0,7) x 0,65 x 100 m

2. Pasir Urug Bawah Pondasi

= 1/2 (0,7143 + 0,7) x 0,05 x 100 m

4) Galian Lubang Septictank

IV

1 LS 0,288 m3

Pekerjaan Galian Tanah

3. Urugan Tanah Kembali

III

VOLUME PEKERJAAN

= 1/2 (lbr ats + lbr bwh) * t*L 52 m3

= 1/2 (lbr ats + lbr bwh) * t*L

= vlume galian - vol pondasi vol pasir urg bwh pondasi = 52 - (6 + 18,75) - 3,54 = (2,3x1,5x1,5)+(1,5x1,5x1,45)

3,54 m3

23,71 m3 8,4375 m3

Pekerjaan Pondasi

Pekerjaan Beton 1. Beton Bertulang a) Sloof dan Ring Balok

1. Pasangan Batu kosong

= p x t x panjang pondasi = 0,6 x 0,1 x 100 m

2. Pasangan Pondasi Cor

= 1/2 (0,25 + 0,5) x 0,5 x 100 m

18,75 m3

Total Volume Pondasi

24,75 m3

b) Kolom

6 m3

= 1/2 (lbr ats + lbr bwh) * t*L

Sloof = p x l x panjang pondasi = 0,15 x 0,2 x 100 m

3 m3

Ring Balok = p x l x panjang pondasi = 0,15 x 0,2 x 100 m

3 m3

Kolom = p x l x tinggi kolom x N = 0,15 x 0,15 x 3,5 x 30

2,36 m3

NO

URAIAN PEKERJAAN

PERHITUNGAN

VOLUME PEKERJAAN

c) Volume Ring Balok Sopi-sopi 1) Bangunan Utama l = 5,28 + 0,34 = 5,62 m

=lxbxhx4 = 5,62 x 0,15 x 0,2 x 4

0,6744 m3

2) Bangunan Garasi l = 3,55 + 0,34 = 3,79 m

=lxbxhx4 = 3,79 x 0,15 x 0,2 x 4

0,4548 m3

Total Volume Pekerjaan Beton Bertulang 2. Beton Tanpa Tulangan campuran 1:3:5 a) Carport 8 m x 3 m x 10 cm

= 8 x 3 x 0,1

b) Dapur Beton - Tngi : 60 cm, lbr 60 cm, pjg 1,5 m, tebal 10 cm - Tngi : 40 cm, lbr 60 cm, pjg 1 m, tebal 10 cm V

58,9917 m3

2,4 m3

= (0,6x1,5x0,1)+ (0,6x0,6x0,1) = (0,6x1x0,1)+ (0,6x0,4x0,1) Volume Total Beton

0,126 m3 0,084 m3 2,61 m3

= pjg trasram x tinggi trasram = 55,5 x 0,3

16,65 m2

= pjg trasram x tinggi trasram = 30,64 x 1,2

36,77 m2

Total Luas Pasangan 1:2 Total Volume Pasangan 1:2

53,418 m2 8,0127 m3

Pekerjaan Dinding 1. Pasangan Dinding Trasram 1:2 > Tinggi Trasram 30 cm, Trasram 1:2 Sloof

Pjg = (pjg pndasi) - (pjg trasram 120 cm) (P1+2P2+2PJ1+PG)

= 100-35,5-9 = 55,5 m > Tinggi Trasram 120 cm,

Pjg = Pjg dinding trasram 120 cm - (3P2 +3P2) = 35,5 - 4,56 = 30,64 m

1. Pasangan Dinding batu bata 1:4 > Dinding >> tinggi dinding batu 1: 4 = 3,5 m - tinggi trasram >> pjg pasangan dinding = pjg pondasi = 100 m

= (Luas dinding total tanpa sopi-sopi) - (luas trasram) -

(luas lubang pintu, jendela & ventilasi ) = (3,5 x 100) - (16,65 + 36,77) (J1 + 4J2 + J3 + 2PJ1+ 2V1)

= (350) - (53,42) - (21,0212) > Sopi-sopi Sopi-sopi bangunan utama, sebanyak 2 sisi Sisi depan dan belakang dipasang ventilasi type 1

275,56 m2

> Tampang Segitiga = 1/2 x 9 x 2,55 = 11,475m2

> Tampang Persegi = 0,26 x 9 = 2,34 m2 281

> Luas Total = (11,475+2,34 - Vnt 1 ) x 2 = 25,418 m2

> Tampang Segitiga = 1/2 x 6 x 1,68 = 5,04 m2

25,418 m2

NO

URAIAN PEKERJAAN

PERHITUNGAN

Sopi-sopi bangunan garasi, sebanyak 2 sisi Sisi depan dipasang ventilasi type 2

VOLUME PEKERJAAN

> Tampang Persegi = 0,26 x 6 = 1,56 m2

> Luas Total 194

= ((5,04+1,56) x 2) - Vnt 1 = 13,2 - 0,414 = 12,786 m2

Total Luas Pasangan Dinding Vol.Tot. Psngn Din 1:4 3. Pasangan Dinding Keramik ukuran 25 x 10 > Kamar Mandi 1 - Pada bak mandi ukuran 0,7 x 0,7 x 0,8 - Bagian tepi atas bak mandi, lebar 10 cm - Pada dinding kamar mandi tinggi 2 meter > Dapur - pada dinding - dapur beton dengan dimensi 60cm x 250m x 10cm Ketinggian dari lantai = 60 cm > Kamar Mandi 2 - Pada bak mandi ukuran 0,7 x 0,7 x 0,8 - Bagian tepi atas bak mandi, lebar 10 cm - Pada dinding kamar mandi tinggi 2 meter > Kamar Mandi 3 - Pada bak mandi ukuran 0,7 x 0,7 x 0,8 - Bagian tepi atas bak mandi, lebar 10 cm - Pada dinding kamar mandi tinggi 2 meter

= (0,7x0,8)+(0,7x0,7) = 0,1 x 1,4 = (2,5 x 2 + 1,5 x 2) x 2 = (3+3 +1,5+2,5) x 2 = 0,6 x 2,5 x 0,1

= (0,7x0,8)+(0,7x0,7) = 0,1 x 1,4 = (2 x 2 + 1,5 x 2) x 2

= (0,7x0,8)+(0,7x0,7) = 0,1 x 1,4 = (2,5 x 2 + 2 x 2) x 2 Luas Total Keramik 25 x 10

6 Pekerjaan Atap 1. Kuda Kuda a) Kuda-kuda tipe 1 > Kaki Kuda-kuda > Balok Gapit (datar) > Balok Gapit (tengah) > Tiang Makelar > 1/2 Tiang Makelar > Balok Skors

2 x 5/10 ; l = 6 meter 2 x 4/22 ; l = 10.75 meter 2 x 4/15 ; l = 6 meter 5/10 ; l = 3 meter 2 x 5/10 ; l = 1.5 meter 2 x 5/10 ; l = 2.5 meter

= 2 x 0.05 x 0.1 x 6 = 2 x 0.04 x 0.22 x 10.75 = 2 x 0.04 x 0.15 x 6 = 0.05 x 0.1 x 3 = 2 x 0.05 x 0.1 x 1.5 = 2 x 0.05 x 0.1 x 2.5 Volume Total Kuda-kuda tipe 1

b) Kuda-kuda tipe 2 > Kaki Kuda-kuda > Balok Gapit (datar) > Balok Gapit (tengah) > Tiang Makelar > 1/2 Tiang Makelar > Balok Skors

2 x 5/10 ; l = 4.75 meter 2 x 4/22 ; l = 7.75 meter 2 x 4/15 ; l = 3.75 meter 5/10 ; l = 2 meter 2 x 5/10 ; l = 1 meter 2 x 5/10 ; l = 1.75 meter

= 2 x 0.05 x 0.1 x 4.75 = 2 x 0.04 x 0.22 x 7.75 = 2 x 0.04 x 0.15 x 3.75 = 0.05 x 0.1 x 2 = 2 x 0.05 x 0.1 x 1 = 2 x 0.05 x 0.1 x 1.75 Volume Total Kuda-kuda tipe 2

Keterangan: > Kuda-kuda Tipe 1 = 2 psg > Kuda-kuda Tipe 2 = 1 psg Voume Total Kuda-kuda

12,786 m2 313,763 m2 47,0644 m3

1,05 m2 0,14 m2 16 m2 20 m2 0,15 m2

1,05 m2 0,14 m2 14 m2

1,05 0,14 18 71,72

m2 m2 m2 m2

3 0,06 m 3 0,1892 m 3 0,072 m 3 m 0,015 3 0,015 m 3 0,025 m

0,3762 m3 3 0,0475 m 3 0,1364 m 3 0,045 m 3 0,01 m 3 0,01 m 3 0,0175 m

0,2189 m3

= 2 x 0.3762 = 1 x 0.2189

0,9713 m3

NO

URAIAN PEKERJAAN 2. Gording a) Bangunan Utama > jumlah gording terpasang = 22 bh > ukuran gording 5 cm x 7 cm > panjang bentangan gording = 14 meter b) Bangunan Garasi > jumlah gording terpasang = 16 bh > ukuran gording 5 cm x 7 cm > panjang bentangan gording = 6 meter

VOLUME PEKERJAAN

PERHITUNGAN

= 22 x 0.05 x 0.07 x 14

1,078 m3

= 16 x 0.05 x 0.07 x 6

0,336 m3

1,414 m3

Total Volume Gording 3. Balok Nok a) Bangunan Utama, 5/10; panjang 14 meter b) Bangunan Garasi, 5/10; panjang 6 meter

0,07 m3 0,03 m3 0,1 m3

= 0.05 x 0.1 x 14 = 0.05 x 0.1 x 6

Total Voume balok Nok 4. Kasau a) Bangunan Utama, jarak antar kasau 60 cm > jumlah kasau terpasang = 48 bh > ukuran kasau 4 cm x 5 cm > panjang bentangan kasau = 6 meter b) Bangunan Garasi, jarak antar kasau 60 cm > jumlah kasau terpasang = 22 bh > ukuran kasau 4 cm x 5 cm > panjang bentangan kasau = 4.75 meter

= 48 x 0.04 x 0.05 x 6

0,576 m3

= 22 x 0.04 x 0.05 x 4.75

0,209 m3

0,785 m3

Total Voume kasau 5. Reng, ukuran 2 cm x 3 cm, jarak antara reng 25 cm a) Bangunan Utama, 24 buah, panjang 14 meter b) bangunan Garasi, 19 buah, panjang 6 meter

0,2016 0,0684 0,27 3,5403

= 24 x 0.02 x 0.03 x 14 = 19 x 0.02 x 0.03 x 6

Total Voume Reng Volume Total KAP 6. Volume Genteng (genteng kodok, 22 x 28 cm) > Bangunan Utama bentangan 14 meter > Bangunan Garasi bentangan 6 meter

154 m2 48 m2 202 m2

= 14 x 5,5 x 2 =6x4x2 Total Luas Geteng

7. Rabung Genteng 8. Talang 9. Lisplank 10. Plafon a) Luas Plafon

18 m 36 m 0,0236 m3

Pipa PVC 10 x 10 ukuran 2/20, 59 meter

= 0,002 x 0,2 x 59 = p1 x l1 + p2 x l2 + p3 x l3

201 m2

= 14 x 11 + 5 x 8 + 3,5 x 2

b) Volume Kerangka Plafon 1) Teras > kerangka plafon 4/6 > kerangka plafon 5/7 2) Kamar Mandi 1 > kerangka plafon 4/6 > kerangka plafon 5/7 3) Dapur > kerangka plafon 4/6 > kerangka plafon 5/7

m3 m3 m3 m3

38 m 20 m 10,5 m 3m 17 m 5m

NO

URAIAN PEKERJAAN

VOLUME PEKERJAAN

PERHITUNGAN

4) Ruang Keluarga > kerangka plafon 4/6 > kerangka plafon 5/7

59 m 32,5 m

5) kamar tidur 1 > kerangka plafon 4/6 > kerangka plafon 5/7

28 m 12 m

6) Kamar mandi 2 > kerangka plafon 4/6 > kerangka plafon 5/7

11,5 4m

7) kamar tidur 2 > kerangka plafon 4/6 > kerangka plafon 5/7

18 m 6m

8) kamar Mandi 3 > kerangka plafon 4/6 > kerangka plafon 5/7

9m 1,5 m

9) kamar Tidur 3 > kerangka plafon 4/6 > kerangka plafon 5/7

18 m 6m

10) Ruang Tamu > kerangka plafon 4/6 > kerangka plafon 5/7

24 m 12 m

Panjang Total Rangka Plafon ukuran 4/6 Panjang Total Rangka Plafon ukuran 5/7 Volume Total Rangka Plafon 7 Pekerjaan Lantai a) Urugan Tanah Bawah Lantai, 10 cm > Lantai Garasi > Lantai Kamar Mandi > Lantai Teras > Lantai Dapur > Lantai Ruang Keluarga > Lantai Ruang Makan > Lantai Kamar Tidur > Lantai Ruang Tamu Komulatif Penambahan tanah akibat pemadatan Total Volume Urugan Tanah Bawah Lantai

233 m 102 m

3 0,5592 m 3 m 0,357

0,9162

= 6 x 4 x 0,1 = [(1,5 x 2,5)+(2 x 2,5)+(1,5x2)]x0,1 = 18 x 1 x 0,1

= 3 x 2,5 x 0,1 = [(3,5 x 4,5)+(2 x 1,5)] x 0,1 = 4,5 x 3,5 x 0,1 = [(4 x 4)+(3 x 3) + (3 x 3)] x 0,1 = 4,5 x 3 x 0,1 = 15% dari volume komulatif = V komulatif + Vol Pemadatan

m3

3 2,4 m 3 1,175 m 3 1,8 m 3 0,75 m 3 1,875 m 3 m 1,575 3 3,4 m 3 1,35 m

14,325 m3 2,14875 m3 16,4738 m3

URAIAN PEKERJAAN

NO

b) Urugan Pasir Bawah Lantai > Lantai Garasi > Lantai Kamar Mandi > Lantai Teras > Lantai Dapur > Lantai Ruang Keluarga > Lantai Ruang Makan > Lantai Kamar Tidur > Lantai Ruang Tamu Komulatif Penambahan tanah akibat pemadatan Total Volume Urugan Tanah Bawah Lantai c) Spesi Bawah Lantai (1:3:5), 5 cm > Lantai Garasi > Lantai Kamar Mandi > Lantai Teras > Lantai Dapur > Lantai Ruang Keluarga > Lantai Ruang Makan > Lantai Kamar Tidur > Lantai Ruang Tamu Total Volume Spesi Bawah Lantai d) Lantai Keramik Pasangan Keramik 30 x 30 > Lantai Teras > Lantai Garasi > Lantai Dapur > Lantai Ruang Keluarga > Lantai Ruang Makan > Lantai Kamar Tidur > Lantai Ruang Tamu Total Luas Keramik 30 x 30 Pasangan Keramik 20 x 20 > Lantai Kamar Mandi 8 Pekerjaan Plesteran

PERHITUNGAN

= 6 x 4 x 0,12 = [(1,5x2,5)+(2x2,5)+(1,5x2)]x0,05 = 18 x 1 x 0,05

= 3 x 2,5 x 0,07 = [(3,5 x 4,5)+(2 x 1,5)] x 0,1 = 4,5 x 3,5 x 0,1 = [(4 x 4)+(3 x 3) + (3 x 3)] x 0,1 = 4,5 x 3 x 0,07 = 15% dari volume komulatif = V komulatif + Vol Pemadatan = 6 x 4 x 0,05 = [(1,5x2,5)+(2x2,5)+(1,5x2)]x0,05 = 18 x 1 x 0,05

= 3 x 2,5 x 0,05 = [(3,5 x 4,5)+(2 x 1,5)] x 0,05 = 4,5 x 3,5 x 0,05 = [(4 x 4)+(3 x 3) + (3 x 3)] x 0,05 = 4,5 x 3 x 0,05

= 18 x 1 =6x4

= 3 x 2,5 = (3,5 x 4,5)+(2 x 1,5) = 4,5 x 3,5 = (4 x 4)+(3 x 3) + (3 x 3) = 4,5 x 3

= [(1,5x2,5)+(2x2,5)+(1,5x2)]x0,05

VOLUME PEKERJAAN

2,88 m3 0,5875 m3 3 0,9 m

0,525 1,875 1,575 3,4 0,945 12,6875 1,90313 14,5906

m3 m3 m3 m3 m3 m3 m3 m3

1,2 m3 0,5875 m3 3 0,9 m

0,375 0,9375 0,7875 1,7 0,675 7,1625

m3 m3 m3 m3 m3 m3

18

m2 m2 m2 m2 m2 m2 m2 m2

24

7,5 18,75 15,75 34 13,5 131,5

11,75 m2

Tebal Plesteran = 1,5 cm

a) Plesteran 1:2 > Plesteran dinding trasram, plesteran luar dan dalam > Plesteran pada kolom

2,0697 m3 = 53,42 x 0,015 x 2 = 0,015 x 3,5 x 30 x 2

8,83986 m3

b) Plesteran 1:4

> Plesteran Dinding, luar dan dalam > Plesteran Sopi sopi, sisi luar 9 Pekerjaan Instalsi Listrik a) lampu SL 18 watt b) Lampu TL 1 x 40 watt c) Stop Kontak d) Sakelar ganda e) Sakelar Tunggal f) MCB g) Pipa 1/2 inchi h) Kabel listrik 2,5 mm i) kabel listrik 1,5 mm

= 275,56 x 0,015 x 2 = 38,204 x 0,15

11 5 8 4 7 1 62,5 62,5 62,5

bh bh bh bh bh bh m m m

NO

URAIAN PEKERJAAN

PERHITUNGAN

VOLUME PEKERJAAN

10 Pekerjaan Instalasi Air a) Closet Duduk b) Septictank c) Bak Kontrol d) Pipa PVC ∅ 1/2 " e) Pipa PVC ∅ 4 " f) Keran Air ∅ 1/2 " 1 kepala g) Keran Air ∅ 1/2 " 2 Kepala h) Westafel i) Shawer j) Saringan air kamar mandi k) elbow - 1/2 " - 3/4 " -4" l) shokect - 1/2 " - 3/4 " -4" m) sambungan T - 1/2 " - 3/4 " -4" n) Tempat Sabun o) Pipa PVC ∅ 3/4"

5 2 1 3 29,5

bh bh bh bh m

11 Pekerjaan Kunci dan Engsel Kunci tanam besar kunci tanam kecil grendel pintu engsel pintu grendel jendela dan ventilasi engsel jendela dan ventilasi hak angin

1 10 22 22 6 12 12

bh bh bh bh bh bh bh

1 1 3 65 29,5 4 2 1 1 3

20 bh 4 bh 1 bh 7 bh 4 bh 3 bh

12 Pekerjaan Finishing 1. Mengecat Dinding (luas plesteran) 2. mengecat kusen dan daun pintu jendela (cat minyak) > Pintu 1 1 unit > Pintu 2 5 unit > Pintu 3 3 unit > Pintu jendela 2 unit > Jendela 1 1 unit > Jendela 2 4 unit > Jendela 3 1 unit > Ventilasi 2 unit > Jalusi 1 2 unit > Jalusi 2 1 unit > Pintu Garasi 1 unit

727,304 m2

Luas Total 3. Pembersihan Terakhir

bh bh bh m bh bh bh bh bh bh

6,9168 24,104 10,584 9,65616 7,2624 19,6512 3,9192 1,7056 2,212 0,678 15 101,689 1

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 LS