ProjectFacility Title Surface EPC Services
Document Number P4D-3-MLN-M-DSH-0001
Phase-4 Development Project Author’s Organization
Validation 5 Years Expired Date 4-Sep-22
Corrosion Inhibitor Injection System Data Sheet Surface Facility EPC Services Phase-4 Development Project
Approval Sheet Name
Title
Budi Prasetyo / Muliawan Kukuh
Project Manager / Deputy Project Manager
Moch. Wahyudi / Tegoeh SM
Engineering & Construction Lead
Revision Status
Date
Signature
Rev
Issue date
By
Chk
App
Issue Purpose
A 0 1
18-Oct-2017 14-Dec-2017 29-Dec-2017
NMH NMH NMH
BHR BHR BHR
MMH MMH MMH
Issued for Review Issued for Approval Issued for Approval
Owner Signature
Corrosion inhibitor injection system Data Sheet
Revision Log Register Revisions had been performed on following pages: Page
Date
Revision
1-3-4-5-6-7-9
12/14/2017
According to Company Comments
3-6-7
12/29/2017
According to Company Comments
P4D-3-MLN-M-DSH-0001 , Rev 1
Page 2 of 10
Corrosion inhibitor injection system Data Sheet NO. OF UNIT
: SEVEN (7) PRODUCTION WELLS
: CORROSION INHIBITOR INJECTION SYSTEM
MODEL NO.
: PT-8XX (REFER TO TABLE PAGE 5)
PACKAGER
: TBA : TBA
PURCH. ORDER NO.
: TBA
CLIENT
: PERTAMINA ALGERIA EP
PLANT/AREA LOCATION
: ALGERIA BLOCK 405a / MLN FIELD
EQUIPMENT NAME PACKAGE TAG NO.
ONE (1) MAKE UP WELL(S)
EXTENT OF PACKAGE
1 2
THE CORROSION INHIBITOR INJECTION PACKAGE FOR NEW PRODUCTION WELL PRODUCE GAS /OIL MIXTURE WITH FREE WATER CONTENTS
3
OF THE PHASE 4 DEVELOPMENT. THE FOLLOWING EQUIPMENTS AS A MINIMUM VENDOR SCOPE OF SUPPLY, BUT NOT LIMITED TO :
4
1. SKID MOUNTED CORROSION INHIBITOR INJECTION SYSTEM INCLUDING:
5
- 316L SS CORROSION INHIBITOR INJECTION TANKS (STORAGE TANK) WITH FILLING CONNECTION.
6
- 316L SS CORROSION INHIBITOR INJECTION PUMP (POSITIVE DISPLACEMENT/ CONTROLLED VOLUME PUMP TYPE).
7
2. INSTRUMENTATION, PIPING, TUBINGS INCLUDING FITTINGS, VALVES, CONNECTORS, STRAINER, DISCHARGE PULSATION DAMPENER, VENTING,
8
LEVEL GAUGE, PRESSURE INDICATOR, LIQUID LEVEL, PRESSURE RELIEF VALVE AND CALIBRATION GAUGE AS SHOWN ON
9 10
Typical Chemical Injection Package P&ID P4D-3-MLN-P-PID-8003
11
3. ELECTRICAL EQUIPMENT/ CABLING UP TO AND INCLUDING JUNCTION BOX.
12
4. UNIT TO BE COMPLETELY WIRED AND PIPED UP.
13
5. INJECTION PUMP. A COMMON WAREHOUSE SPARE FOR THE INJECTION PUMPS TO BE PROVIDED.
14
TOTAL INJECTION PUMPS REQUIRED ARE 10 UNITS (I.E. 3 UNITS + 1 SPARE FOR 9.6 L/H PUMP CAPACITY and 5 UNITS
15
+ 1 SPARE FOR 4.61 L/H PUMP CAPACITY).
16
6. LIFTING LUGS, EARTHING BOSS AND NAMEPLATE.
17
7. STRUCTURAL SKID BASE WITH DRIP PAN.
18
8. DETAIL ENGINEERING, CALCULATIONS, DRAWINGS, P&ID, ETC.
19
9. FAT (FACTORY ACCEPTANCE TEST) & SAT (SITE ACCEPTANCE TEST).
20
10. PROCUREMENT, INSTALLATION, & FABRICATION.
21
11. INSPECTION AND TESTING.
22
12. MECHANICAL WARRANTY.
23
13. ON SKID FABRICATION SUCH AS ;
24
-
CARBON STEEL STRUCTURE AND PIPING SUPPLY AND FABRICATION,
25
-
ERECTION AND ASSEMBLY OF EQUIPMENT,
26
-
ELECTRICAL AND INSTRUMENTATION INSTALLATION,
27
-
SURFACE PREPARATION AND PAINTING, (IF REQUIRED)
28
-
TESTING AND PRECOMMISSIONNING,
29
-
DELIVERY PORT SKIKDA ALGERIE. APPLICABLE SPECIFICATIONS / DRAWINGS
30 31
P4D-3-MLN-M-SPE-0001
CORROSION INHIBITOR INJECTION SYSTEM SPECIFICATION
32
P4D-3-MLN-W-SPE-0002
PIPING AND VALVE CLASS
33
P4D-GEN-I-SPE-0004
SPECIFICATION FOR JUNCTION BOXES AND CABLE GLANDS
34
P4D-3-MLN-E-SPE-0002
GENERAL SPECIFICATION OF SOLAR POWER UNIT
35
P4D-3-MLN-P-PFD-8004
PFD Typical Production Well Head
36
P4D-3-MLN-P-PID-8002
TYPICAL PRODUCER WELLHEAD P&ID
37
P4D-3-MLN-P-PID-8003
Typical Chemical Injection Package P&ID
38
P4D-3-MLN-P-SYM-8001
LEGEND AND SYMBOLS P&ID
39
P4D-CPF-O-SDY-0001
MATERIAL SELECTION STUDY REPORT
40
P4D-3-GEN-G-DBS-0001
DESIGN BASIS REPORT SITE AND UTILITY DATA
41 42
SITE CONDITION:
43
-
ATMOSPHERIC PRESSURE : 996 mbar
44
-
MECHANICAL DESIGN TEMPERATURE (MIN / MAX): -5 / 60 (SHADED), 80 (EXPOSED) °C
45
-
RELATIVE HUMIDITY (MIN/MAX) : 20 - 80 %
46
-
WIND :139 km/h @ 10 m
47
-
LOCATION: TROPICALIZED, ONSHORE, OUTDOOR, DUST CONDITION (DESERT AREA). ELECTRICAL INFORMATION
48 49
ELECTRICAL AREA CLASSIFICATION :
50
ELECTRIC POWER SUPPLY :
ZONE 2, GROUP IIA, TEMPERATURE CLASS T3
FROM SOLAR PANEL 24 VDC
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
P4D-3-MLN-M-DSH-0001 , Rev 1
Page 3 of 10
Corrosion inhibitor injection system Data Sheet DESIGN REQUIREMENTS
1 2
DUTY SPECIFICATION :
3
1. VENDOR TO ADVISE CHEMICAL INJECTION RATES.
4
2. THE PUMPS ARE LOCATED IMMEDIATELY NEXT TO THE LINE WHERE INJECTION TAKES PLACE.
5 6
PROCESS CONTROL/SAFETY :
7
1. THE INJECTION RATE HAS TO BE LOCALLY CONTROLLED PER PUMP. THE INJECTION RATE MUST BE INDICATED LOCALLY.
8
2. THE STORAGE TANK MUST BE PROVIDED WITH A LOCAL LEVEL INDICATOR, AND A LOW LEVEL ALARM.
9
3. EACH INJECTION PUMP SHALL BE PROTECTED AGAINST OVERPRESSURE BY AN INTEGRATED RELIEF VALVE SET AT THE DESIGN PRESSURE
10
SPECIFIED FOR EACH WELL.
11
4. THE PUMP MUST BE ABLE TO SUPPLY THE CHEMICAL PRODUCT UP TO DESIGN PRESSURE OF CHOKE VALVE.
12
5. THE PUMP FLOWRATE IS CALIBRATED LOCALLY. CALIBRATION FACILITIES FOR THE INJECTION PUMP HAVE TO BE PROVIDED.
13 14
UNLOADING CHEMICALS:
15
1. VENDOR TO ADVISE THE MOST OPTIMUM METHOD FOR CHEMICALS UNLOADING (AND STORAGE).
16 17
NOISE AND REQUIREMENT:
18
1. THE NOISE LEVEL SHALL NOT EXCEED 85 DB(A) AT 1 M FROM THE PACKAGE.
19
TYPICAL CORROSION INHIBITOR INJECTION PACKAGE SCHEMATIC (AS REFERENCE)
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
TIE-IN LIST
67 68 69
NO. 1
TIE-IN NO. TP-1
SERVICE LIQUID OUTLET
SIZE (IN)
RATING- TYPE
1/2"
600# / SWRF
REMARKS A 182 F 316L MATERIAL
PACKAGE WEIGHT
70 71
TOTAL PACKAGE WEIGHT
:
VTA
kg
72
SHIPPING WEIGHT
:
VTA
kg
73
P4D-3-MLN-M-DSH-0001 , Rev 1
Page 4 of 10
Corrosion inhibitor injection system Data Sheet PROCESS DATA FOR CORROSION INHIBITOR INJECTION PACKAGE
1 2
WELLHEAD AREA
MLN-19P
KMD-5P
MLN-18P
MLW-10P
MLNW-11P
MLSE-9P
KMD-7P
MLNW-12P
3
TAG NO. PACKAGES
61-PT-900
62-PT-900
63-PT-900
64-PT-900
67-PT-900
68-PT-900
69-PT-900
71-PT-900
(Remark 3)
4 5
TANK DATA:
6
TAG NO. OF TANKS
7
QUANTITY
8
NOMINAL WORKING CAPACITY
9
DIMENSIONS;
62-TK-900
63-TK-900
64-TK-900
67-TK-900
68-TK-900
69-TK-900
71-TK-900
1 (ONE)
1 (ONE)
1 (ONE)
1 (ONE)
1 (ONE)
1 (ONE)
1 (ONE)
1 (ONE)
m3
1
WIDTH
mm
VTA
LENGTH
mm
VTA
mm
12
HEIGHT OPERATING TEMPERATURE
°C
VTA AMB
13
OPERATING PRESSURE
barg
ATM
10 11
(Remark 1)
61-TK-900
14
Full vaccum / Atm+Full of water
15
DESIGN PRESSURE
16
DESIGN TEMPERATURE
17
PRODUCT HEIGHT (LLLL/ HL)
mm
18
MAXIMUM TEST FILL HEIGHT
mm
1270 (VTC)
19
NOMINAL PRODUCT STORAGE
day
7 (Remark 1)
(MAX./MIN.)
60 (SHADED), 80 (UNSHADED) / - 5 110 / 1221 (VTC)
20 21
PUMP DATA:
22
TAG NO. OF PUMPS
(Remark 1)
23
CAPACITY @ PT
24
DISCHARGE PRESSURE
barg
75
25
SUCTION PRESSURE
barg
ATM
26
DIFFERENTIAL PRESSURE
27
NPSH REQUIRED
28
TREATED STREAM:
29
FLUID
30
FLOWRATE (MIN/MAX)
(RATED)
62-P-900
63-P-900
64-P-900
67-P-900
68-P-900
69-P-900
71-P-900
9.6
9.6
4.61
4.61
4.61
4.61
9.6
4.61
bar
75
m
Remark 5
31
GAS
MMSCFD
32
OIL
STBPD
WATER
STBPD
(OP./DES.)
barg
33 34
61-P-900 l/h
INJECTION PRESSURE
VTA
Min Flow
Max Flow
Min Flow
Max Flow
Min Flow
Max Flow
Min Flow
Max Flow
Min Flow
Max Flow
Min Flow
Max Flow
Min Flow
Max Flow
Min Flow
6.86
21.9
1.12
17.38
1.27
10.75
4.19
7.06
1.33
12.2
-
39
1.86
19.7
1.4
8.02
799.66
2201.43
72.24
1862.16
96.03
943.47
504.32
1572.44
23.17
1642.01
-
2700
121.08
1000
66.98
751.91
44.93
1.47
38.00
1.96
19.25
10.29
32.09
0.47
33.51
-
55.10
2.47
20.41
1.37
16.32 Remark 6
48/75
48,5/75
48/75
60/75
49,5/75
66/75
45/75
Max Flow
15.35 57/75
35 36
LIQUID DATA:
37
TYPE LIQUID
38
PUMPING TEMPERATURE
39
SPECIFIC GRAVITY
40
VISCOSITY AT OPERATING TEMPERATURE
41
INJECTION CONCENTRATION
42
INJECTION RATE (MIN/MAX)
43
PRODUCT DENSITY @ T, P (Sp.Gr.)
44
VAPOR PRESSURE
Chemical (Remark 2) °C
AMB (10 - 55) 1.1
mPas
< 20
ppm vol
10-20 (VTC)
Remark 7
1.377
8.745
0.226
7.124
0.251
4.268
0.824
2.875
0.254
4.564
kg/m3
1100 (VTC)
bara
120 @ Flowing Temperature (VTC)
15.4
0.356
7.511
0.271
3.152
45 46 47
Remarks:
48
1. REQUIRED STORAGE CAPACITY IS 1 m 3 AS MINIMUM DETERMINED BASED ON MAXIMUM INJECTION RATE AND FOR ONE WEEK OPERATION.
49
2. THE SELECTED CORROSION INHIBITOR CORRTREAT 702 (TYPICAL WITH EXSITING) IS WATER BASED AND INJECTED PURE.
50
3. MINIMUM AND MAXIMUM FLOWRATE ARE BASED ON PRODUCTION PROFILES PROVIDED IN THE DESIGN BASIS
51
4. INJECTION PRESSURE WILL BE UPDATED BASED ON THE HYDAULIC STUDY REPORT FOR THE PRODUCTION NETWORK
52
5. INJECTION RATE ARE BASED ON FLOWLINE DESIGN PRESSURE (75 BARG) AND WELL HEAD TEMPERATURE , VENDOR SHALL CONFIRM INJECTION RATE
53 54 55 56 57 58 59 60 61 62 63
P4D-3-MLN-M-DSH-0001 , Rev 1
Page 5 of 10
Corrosion inhibitor injection system Data Sheet 1
CORROSION INHIBITOR STRUCTRE SKID GENERAL CHARACTERISTICS (Note 13)
2
Overal package dimension
:
3
Overall package weight
:
VTA
4
Empty Weight
VTA
Kg
5
Transport/Transit/Lift Operating Weight (normal & max)
VTA
Kg
6
VTA
Kg
7
Test Weight
VTA
Kg
8
Center of Gravity for each weight
VTA
Kg
9
Maintenance weight data
VTA
Kg
10 11
TANK GENERAL CHARACTERISTICS DESIGN CODE AND SPECIFICATION
:
MANUFACTURER STANDARD
(NOTE 1)
13
DESIGN TEMPERATURE
:
REFER TO PAGE 5
14
DESIGN PRESSURE
:
REFER TO PAGE 5
15
OPERATING TEMPERATURE
:
AMB
16
OPERATING PRESSURE
:
ATM
17
HYDROTEST PRESSURE :
:
FULL OF WATER
19
PLATE THICKNESS ( TOP & SHELL)
:
6
(VTC) + Note14
ULTRASONIC TESTING
:
NO
20
PLATE THICKNESS (BOTTOM)
:
6
(VTC) + Note14
DYE PENETRANT TESTING
:
YES (100%)
21
CORROSION ALLOWANCE
:
N/A
INSPECTION
:
AUTHORIZED INSPECTOR
22
INTERNALS
:
NO
STAMP
:
N/A
23
FIREPROOFING
:
NO
MATERIAL CERTIFICATION
:
YES
24
INSULATION
:
NO
EMPTY WEIGHT
:
VTA
kg (NOTE 6)
25
EXTERNAL PAINTING
:
N/A
OPERATING WEIGHT
:
VTA
kg
26
INTERNAL COATING
:
NO
TEST WEIGHT
:
VTA
kg
27
SACRIFICIAL ANODE
:
NO
Center of Gravity for each weight
:
VTA
Kg
28
PICKLING AND PASSIVATION
:
YES, ALL SS PARTS
Datum to be provided in the drawing
:
VTA
29
STRESS RELIEVE
:
NO
INTERNAL VOLUME
:
VTA
30
RADIOGRAPHY
:
10% ON ALL BUTT WELDS
33
TYPE OF TANK
:
CYLINDRICAL
SHELL PLATE
:
SS 316 L
34
LADDER & CLIPS
:
NO
TOP ROOF PLATE
:
SS 316 L
35
INSULATION RINGS OR CLIPS
:
NO
BOTTOM PLATE
:
SS 316 L
36
PIPING CLIPS
:
NO
FLANGES
:
A 182 F 316L
37
PERSONNEL PROTECTION
:
NO
NOZZLES
:
A 312 TP 316L
38
STIFFENERS
:
YES
GASKETS
:
VTA
39
HINGE
:
YES FOR HANDHOLES
EXTERNAL ATTACHMENTS
:
SS 316 L
40
SUPPORT
:
YES, LEGS
EXTERNAL STUDS
:
A193 B8M CLASS 2
41
INTERNAL COATING
:
N/A
EXTERNAL NUTS
:
A194 GR 8MA
42
INTERNALS
:
N/A
INTERNAL STUDS
:
N/A
43
INTERNAL ATTACHMENTS
:
N/A
INTERNAL NUTS
:
N/A
44
STIFFENERS
:
SS 316 L, IF ANY
45
SUPPORT - SKID
:
SS 316 L
46
EARTHING LUG
:
SS 316 L
47
LIFTING LUGS
:
SS 316 L
48
NAME PLATE
:
SS 316 L
49
NAME PLATE BRACKET
:
SS 316 L
12
18
(NOTE 3)
(NOTE 4)
m3
31 32
50
CONSTRUCTION AND MATERIAL SPECIFICATION (Note 15)
(NOTE 11)
VTA = VENDOR TO ADVISE, VTC = VENDOR TO CONFIRM, TBA = TO BE ADVISE, N/A = NOT APPLICABLE
51 52
NOTES
53
1. VENDOR SHALL BE DESIGN OF TANK WITH CONSIDERING PROCESS NEEDED.
54
2. PAINTING AND COATING SHALL BE AS PER "Specification for Surface Preparation P4D-GEN-X-SPE-0004 " & "Coating specification P4D-3-MLN-W-SPE-0003 "
55
3. REGULATING & INSPECTION AUTHORITY SHALL REFER TO DOCUMENT NO. MLN-AOI-0010, "ARH-DGM DOSSIER PREPARATION" AND
56
MLN-AOI-0011, "ALGERIAN AUTHORITIES COMMUNICATION PROCEDURE".
57
4. MATERIAL CERTIFICATION IS IN ACCORDANCE WITH EN 10204 TYPE 3.2 FOR PRESSURE RETAINING PARTS & EN 10204 TYPE 2.2 FOR NON PRESSURE PARTS.
58
5. FOR EACH CHEMICAL INJECTION TANK/COMPARTMENT UNLESS OTHERWISE NOTED.
59
6. TO BE CALCULATED FOR OVERALL WEIGHT OF THE TANK.
60
7. DESIGN LIFE SHALL BE 20 YEARS.
61
8. BOTTOM SLOPE TO DRAIN NOZZLE
62
9. NOZZLE SIZE, RATING, FACING, ORIENTATION, PROJECTION AND ELEVATION ARE INDICATIVE ONLY AND SHALL BE CONFIRMED BY VENDOR
63
10. FLANGE BOLT HOLE SHALL BE STRADLE TO CENTER LINE
64
11. 4 ( FOUR ) LEGS SHALL BE PROVIDED AT THE TANK WITH OPPOSITE MOUNTED.
65
12. ALL NOZZLE FLANGES SHALL CONFORM TO ASME B 16.5.
66
13. If different material are used between structure skid and equipment, Insulation gaskets are required to prevent galvanic corrosion
67
14. Minimum selected tank plate thickness shall be 3 mm
68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91
P4D-3-MLN-M-DSH-0001 , Rev 1
Page 6 of 10
Corrosion inhibitor injection system Data Sheet 1
NOZZLE SCHEDULE (NOTE 9,12 PAGE 6)
2
SIZE (IN) (VTC)
RATING
TYPE/FACING
PROJECTION (mm)
ELEVATION (mm)
TAG
QTY
5
N1
1
2
3000#
NPT
VTA
VTA
FILLING CONNECTION
6
N2
1
1/2
3000#
NPT
VTA
VTA
LIQUID OUTLET
7
N3
1
1
VTA
VTA
VTA
VTA
VENT C/W SAND SCREEN
8
N4
1
1
3000#
NPT
VTA
VTA
DRAIN
9
N5 A / B
2
1
3000#
NPT
VTA
VTA
LEVEL GAUGE
10
N6
1
VTA
VTA
VTA
VTA
VTA
LEVEL SWITCH LOW
11
N7
1
1/2
3000#
NPT
VTA
VTA
CALIBRATION POT
12
N8
1
3/4
3000#
NPT
VTA
VTA
PURGE TANK WITH PLUG
VTA
VTA
PSV DISCHARGE TO TANK
-
-
VTA
VTA
HAND HOLE - PLATE FLANGE
3
DESCRIPTION
REMARK
4
13
N9
1
2
14
HH
1
VTA
15 16 17
TYPICAL CORROSION INHIBITOR TANK SKETCH (NOTE 8 PAGE 6)
18 19
N4
20
HH
21 22
N9
23 Lif tin g Lu gs
24 25 26 27
N3
28
N1
29 30 31
N6
32 33 34
N5A
35 N5B
36
N2
N8 N7
37
TOP VIEW
38 39 40
N7
41 Lifti ng Lug s
42 43 44
N8 HH
N1
N3
N9
45 46 47 48 49
N5A
50 51 VT A
52 53 54
VT A (CC)
56
VTA
57
Nam e plate
55
58 59 60 61 62
N6
N5B
N2
63 64 VTA
65
N4 Ear thin g Lug s
66 67 68 70
PLAN VIEW
71
TK-8XX
72
4 (Fo ur) Leg s Sup port
69
73 74
NOTES
75 76 15. Cylindrical shape is just for reference, Vendor shall propose the adequate tank design and shall be submitted to Campany approval 77 78 79 80
P4D-3-MLN-M-DSH-0001 , Rev 1
Page 7 of 10
Corrosion inhibitor injection system Data Sheet 1 APPLICABLE TO:
PROPOSALS
PURCHASE
AS BUILT
2 FOR
PERTAMINA ALGERIA EP
UNIT
P-8XX (REFER TO PAGE 5)
3 SITE
ALGERIA BLOCK 405a / MLN FIELD
NO. OF PUMPS REQUIRED
8 UNITS (+ 2 SPARE)
4 SERVICE
CORROSION INHIBITOR INJECTION PUMP
SIZE AND TYPE
TBA
5 MANUFACTURER
TBA
SERIAL NO.
TBA
6 MANUFACTURER
7 NOTES: INDICATES INFORMATION TO BE COMPLETED BY
PURCHASER / MANUFACTURER
GENERAL
8 9 NO. MOTOR DRIVEN
10 (TEN) EA
OTHER DRIVER TYPE
10 PUMP ITEM NO'S
P-8XX (REFER TO PAGE 5)
PUMP ITEM NO'S
11 MOTOR ITEM NO'S
M-8XX
DRIVER ITEM NO'S
N/A
GEAR ITEM NO'S
N/A
12 MOTOR PROVIDED BY
VTA
DRIVER PROVIDED BY
N/A
GEAR PROVIDED BY
N/A
13 MOTOR MOUNTED BY
VTA
DRIVER MOUNTED BY
N/A
GEAR MOUNTED BY
N/A
DRIVER DATA SHEET NO.
N/A
GEAR DATA SHEET NO.
N/A
14 MOTOR DATA SHEET NO VTA
N/A N/A
15 16
OPERATING CONDITIONS
LIQUID
(l/h)
17
CAPACITY @ PT
TYPE OR NAME OF LIQUID
18
MAXIMUM
MINIMUM
PUMPING TEMPERATURE
19
RATED
NORMAL
NORMAL
20
DISCHARGE PRESSURE barg
21
MAXIMUM
MINIMUM
22
SUCTION PRESSURE
barg
23
MAXIMUM
24
DIFFERENTIAL PRESSURE bar
CORROSIVE/EROSIVE AGENTS
25
MAXIMUM
MINIMUM
CHLORIDE CONCENTRATION (PPM)
26
NPSH AVAILABLE
m
27
WITHOUT ACCELERATION HEAD
28
TURNDOWN RATIO
-
SPECIFIC GRAVITY RATED
°C MAX
SPECIFIC HEAT VISCOSITY
MINIMUM REFER TO PAGE 5
-
MIN
MAXIMUM REFER TO PAGEMINIMUM 5 Cp J/(kg.°C)
Cp
MINIMUM
VAPOR PRESSURE
MAXIMUM
bara
H2S CONCENTRATION (PPM) LIQUID
ACTUAL
TOXIC
FLAMMABLE
OTHER
29 30
PERFORMANCE (NOTE 1 PAGE 10)
31
NUMBER OF FEEDS
32
NPSH REQUIRED
33
Kw RATED
34
PLUNGER SPEED (strokes/min)
35
DIAMETER mm
36
PUMP HEAD:
37
MAXIMUM PRESSURE
38
HYDRO TEST PRESSURE barg
39
MAX. DISCH PRESSURE W/ JOB DRIVER
barg
40
MAX. KW BASIS GEAR STRENGTH
N/A
SITE AND UTILITY DATA
MAX. RATED CAP. (m3/h)
VTA
VTA
VTA
VTA
AT RELIEF SETTING
VTA VTA
VTA
mm
ANSI
in
CLASS
FACING
POSITION
SUCTION
VTA
-
VTA
BOTTOM
46
DISCHARGE
VTA
-
VTA
SIDE
47
FLUSH
FUMES
DRIVERS
HEATING
CONTROL
SHUTDOWN
24 VDC
N/A
24 VDC
24 VDC
HERTZ
N/A
N/A
-
-
PHASE
N/A
N/A
-
COOLING WATER TEMP
INLET
°C
INSTRUMENT AIR
JACKET REQ'D DIAPHRAGHM
DIAPHRAGM DIA mm
52
VALVES/FEED
53
TYPE
54
NUMBER
SALT ATMOSPHERE
VOLTAGE
SOURCE
48
51
(62°C Peak Rate)
ELECTRICITY
PRESS. (barg)
TYPE
/ 47
UTILITY CONDITIONS
45
LIQUID END
0
OTHER
CONNECTIONS
50
T3
TEMP.CL
TROPICALIZATION REQ'D
SITE DATA
DUST
VTA
44
49
WINTERZARION REQ'D
IIA
GR
UNUSUAL CONDITION
CONSTRUCTION SIZE
UNDER ROOF
2
RANGE OF AMBIENT TEMPS: MIN/MAX
VTA VTA
41 43
OUTDOOR
UNHEATED
ELECTRICAL AREA CLASS ZONE
VTA VTA
DESIGN MAX
LENGTH OF STROKE
barg
42
INDOOR
HEATED
VTA
m
LOCATION
PLUNGER
PRESSURE (barg)
-
RETURN
DESIGN
MAX
N/A
MAX
N/A
N/A
N/A
N/A -
MIN
N/A
N/A
N/A
MAX
MIN
-
-
NO. REQ. SUCTION
DISCHARGE
Ball (VTC)
Ball (VTC)
VTA
VTA
APPLICABLE SPECIFICATIONS: API 675 POSITIVE DISPLACEMENT PUMPS - CONTROLLED VOLUME GOVERNING SPECIFICATION (IF DIFFERENT) :
55 56 REMARKS :
-
57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72
P4D-3-MLN-M-DSH-0001 , Rev 1
Page 8 of 10
Corrosion inhibitor injection system Data Sheet 1
CONTROLS
MATERIALS (NOTE 2 PAGE 10 & VTC)
2 LIQUID END
SS 316
3 CONTOUR PLATE
-
MANUAL
REMOTE
PNEUMATIC
4 HYDRAULIC DIAPHRAGM
-
AUTOMATIC
LOCAL
ELECTRONIC
5 PROCESS DIAPHRAGHM
-
STROKE CONTROL :
6 PLUNGER
-
FLOWRATE RATED / NORMAL (Nm3/hr)
7 LANTERN RING
SS 316
PNEUMATIC (barg) :
8 PACKING GLAND
SS 316
MINIMUM
9 PACKING
Teflon Composite
ELECTRONIC (mA)
10 VALVE
SS 316
MINIMUM
TYPE :
VTA VTA
N/A N/A
N/A
MAXIMUM
(NORMAL 24 VDC) VTA
VTA
MAXIMUM
11 VALVE SEAT
SS 316
12 VALVE GUIDE
SS 316
13 VALVE BODY
SS 316
VENDOR FURNISHED PROCESS PIPING
14 VALVE GASKET
-
VENDOR REVIEW PIPNG DRAWINGS
15 FRAME
-
VENDOR FURNISHED PULSATION SUPPRESSION DEVICES
OTHER PURCHASE REQUIREMENT NAMEPLATE UNITS
16 SPECIAL MATERIAL TESTS (2.13.1.3)
SI
ON SKID PACKAGE
VENDOR FURNISHED RELIEF VALVE
17
INTERNAL
18 MINIMUM DESIGN METAL TEMPERATURE 19
U.S CUSTOMARY
O
EXTERNAL
C VTA
LOW AMBIENT TEMPERATURE MATERIAL TESTS (2.13.5)
RELIEF VALVE SETTING
20
85
(barg)
VENDOR FURNISHED BACK-PRESSURE VALVE
21
DOUBLE CHECK VALVE REQUIRED
22
QA INSPECTION AND TEST
OIL-FILLED PRESSURE GAUGES REQUIRED
23
COMPLIANCE WITH INSPECTORS CHECK LIST
VENDOR FURNISHED CONTROL PANEL
24
CERTIFICATION OF MATERIALS
BASEPLATE PREPARED FOR EPOXY GROUT
25
FINAL ASSEMBLY CLEARANCES
PROVIDE TECHNICAL DATA MANUAL
26
SURFACE AND SUBSURFACE EXAMINATIONS
CALIBRATION GAUGE
27
RADIOGRAPHY
FOR COMPLETE SCOPE OF SUPPLY, REFER TO PAGE 3 AND
28
ULTRASONIC
P&ID NO. P4D-3-MLN-P-PID-8003
29
MAGNETIC PARTICLE
30
LIQUID PENETRANT
PREPARATION FOR SHIPMENT DOMESTIC
EXPORT BOXING
31
CLEANLINESS PRIOR TO FINAL ASSEMBLY
OUTDOOR STORAGE MORE THAN 6 MONTHS
32
HARDNESS OF PARTS, WELDS & HEAT AFFECTED ZONES
DOMESTIC
33
FURNISH PROCEDURES FOR OPTIONAL TEST
34 TESTS
REQ'D
WIT
EXPORT BOXING WEIGHTS (KG)
OBS
PUMP
VTA
BASE
-
N/A
GEAR
DRIVER
VTA
35 HYDROSTATIC 36 STEADY STATE ACCURACY
DRIVERS
VTA
37 MECHANICAL RUN
MOTOR :
38 PERFORMANCE
MANUFACTURER
39
TYPE
40
VTA DC Motor (VTC) VTA
FRAME NO. LUBRICATION FLUID (NOTE 3 PAGE 10)
41 42
CRANKCASE
43
HYDRAULIC FLUID
INTERMEDIATE ACCESSORIES
44
VTA
CONSTANT SPEED
VTA
VARIABLE SPEED KW
VTA
RPM
VTA
VOLTS
24 VDC
PHASE
N/A
45
SPEED REDUCER MANUFACTURER
HERTZ
46
INTEGRAL
ENCLOSURE
47
MODEL
OTHER (SEE SEPARATE DATA SHEETS)
48
RATIO
GAS DRIVEN
49
BASEPLATE UNDER
50
COUPLING MANUFACTURER
51
TYPE
SEPARATE
Part of Package
N/A TEFC
1.0
-
STEAM TURBINE OTHER
SERVICE FACTOR
AIR -DRIVEN
52 DIMENSIONS (KG)
53 54 Pump Dimensions
VTA
55 56 57 58 59 REMARKS :
-
60 1. Pump Type shall be confirmed by Vendor 61 62 63 64 65 66 67
P4D-3-MLN-M-DSH-0001 , Rev 1
Page 9 of 10
Corrosion inhibitor injection system Data Sheet NOTES
1 2 3
1. INJECTION RATE IS ADJUSTABLE FROM MAX AND TURNDOWN.
4
2. VENDOR SHALL PROVIDE PUMP AND PACKAGE MATERIAL SUITABLE FOR THE CHEMICAL LIQUID.
5
3. PUMP LUBRICATION AS PER MANUFACTURER STANDARD.
6
4. ACCURACY OF VOLUMETRIC OUTPUT SHALL BE WITHIN 1 % OF FULL INJECTION RANGE.
7
5. PUMP DISCHARGE PRESSURE SHALL NOT EXCEED THE MAXIMUM PRESSURE STATED IN PUMP DATA SHEET.
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67
P4D-3-MLN-M-DSH-0001 , Rev 1