EMMFORCE INC.
PLOT NO. 3 & 5, EPIP, JHAR MAJRI, BADDI H.P
DEVELOPMENT PLAN
RAS0131 Process
Responsibility (Mr. ) RAS0131
Design Drawing
Amrinder S
Forging Drawing
Amrinder S
Process Drawing
Amrinder S
Forging Die
Amrinder S
Forging
Ajay
Normalising
AJAY PPC
Flange Rough
Manpreet
Total Length
Manpreet
Strainghtening
Manpreet
Rough Turning
Manpreet
CNC 1
Manpreet
CNC 2
Manpreet
Hobbing Z12
Manpreet
Inspection
Gurpreet
Roll Marking
Manpreet
Ind. Hrd./MPI/Temp
Manpreet
Inspection
Gurpreet
Straightening
Manpreet
Face Cut
Manpreet
Inspection
Manpreet
Despatch
Gurpreet
Project Start 1.09.2020 Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual
Nov'20
Oct-20 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15