Smq2015-292n- Sm Trece- Ramp Railings.pdf

  • Uploaded by: Jeany Rose Borata
  • 0
  • 0
  • January 2021
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Smq2015-292n- Sm Trece- Ramp Railings.pdf as PDF for free.

More details

  • Words: 445
  • Pages: 1
Loading documents preview...
Comanchesteel Corporation 22B C. Cordero St. 2nd Ave, West Gracepark, Caloocan City 1403 Tel No: 366-2876 to 77 / 442-3816 / 362-9630 Fax : 365-6237 Email us at: [email protected]

QUOTATION (No.SMQ2015-292 N) April 13, 2016 MR. HANS SY President SM ENGINEERING DESIGN & DEVELOPMENT MAXX Bldg., Coral Way cor. J.W. Diokno Blvd. Mall of Asia Complex, Pasay City 1300 Attn

:

Arch Fides G. Hsu VP EDD Design

Thru

:

Ar. Romielyn D. Balolong Regional Design Manager

Project

:

SM City Trece Martires – Mall Construction

/

Ar. APRILYN A. ESTEVES, uap Design Officer

Dear Sir/Madam, In compliance with your inquiry for Fabrication and Installation of SS Ramp Railings, we have the pleasure of submitting our quotation herewith, attached with the following conditions. Hoping to be in favor with your esteemed order, we remain. Description

Item # 1.0

SS Ramp Railings at Garden Area (7.8 lm) Materials: 50mmØ x 1.5mmthk SS Tube (304) 100mmØ x 6mmthk MS Base Plate 10mmØ Expansion Bolt SS Flange Cover SS Disabled Ramp Railings @ Mall Entrance Materials: 50mmØ x 1.5mmthk SS Tube (304) 100mmØ x 6mmthk MS Base Plate 10mmØ Expansion Bolt SS Flange Cover SS Stair Railings @ Mall Entrance (4.281 lm) Materials: 50mmØ x 1.5mmthk SS Tube (304) 100mmØ x 6mmthk MS Base Plate 10mmØ Expansion Bolt SS Flange Cover Mobilization, Delivery and Transportation Cost

2.0

3.0

4.0

Qty

Unit Price

Amount

2.00

units

25,396.96

50,793.91

14.10

lm

3,256.02

45,909.88

3.00

units

13,939.02

41,817.06

10,000.00 TOTAL AMOUNT

148,520.86

NOTE : The owner shall supply electricity, water and adequate working space without additional cost against CSC. Quantities are remeasurable as per actual. Restoration of concrete BY OTHERS. Any complaint/s will be entertained within 7 days upon installation Any changes in design / specifications for this project will be subject to price adjustment. Any cancellation of approved order shall bear penalty in the mount corresponding to damages incurred by Comanchesteel. Payment Terms : 30% Down payment; balance progress billing Validity : Prices quoted above are valid only for seven (7) days from the date of the quotation. WARRANTY : One (1) year on labor and six (6) months on parts from the date of delivery. Warranties herein stated limited only to normal use and proper maintenance of the equipment The warranties do not extend to careless, abusive or improper use and maintenance. Thank you for giving us the opportunity to quote and we look forward to receive your most valued order Respectfully,

CONFORME:

AR. STEVEN S. SY General Manager

Mr. HANS SY President SM PRIME HOLDINGS INC. (In his personality & for the corp.)

Prepared By: Mayrha M. Checked By:

E:\CSC\ESTIMATE\SM-EDD\SMQ2015-292N- SM TRECE- RAMP RAILINGS Page 1 of 1

Related Documents

Sm Mcq
January 2021 3
343626476-trece-horas.pdf
January 2021 2
17mb12-sm
March 2021 0
Ahmigom-pax And Ramp Saja
January 2021 0
Sm Saa6d125e-3 Sebm024208
January 2021 0

More Documents from "Seno Agus"