5000

C1

C1

A

5000

5000

5000

B 5000

5000

C2

C2

B1

C2

5000

C

C1

B1 C1 C1

B1 C1 C1

2

B1 B1

C1 C1

B1 C1

B1

C2

B1

C2

C1

5000

D 4

B1 C1

3

1

B1

C1

2

1

B1

1

FOUNDATION LAY OUT

30000

5000

NOTES:

B1

7

B1

6

B1

5

1:50, 1:25 19012008

SCALE DRG NO.

DRAWN JUNE 2010 01 SHEET NO.

................................

ARCHITECT

DATE

FOUNDATION LAYOUT DETAILS

DESIGNED

Ms OSILO GRACE, P.O.BOX........., TEL.................. TITLE

AT PLOT............, BLOCK .........., MBALE.

PROPOSED WAREHOUSE AND SUPPORT FACILITIES

CLIENT

PROJECT

STRUCTURAL & CIVIL ENGINEERS

SECTION 1-1 THRU FOUNDATION

690

SECTION 2-2 THRU FOUNDATION

690

6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE CONSTRUCTION

5.MINIMUM COVER TO ALL STEEL IN (i) Foundation, stubcolumns, column bases & ground beams =40mm (ii)Beams =25mm (iii) Slabs = 40mm (iv) Columns =30mm (v) Bot. slab =20mm

(b) Mild steel bars Marked 'R' on these dwgs to be round bars to BS 4483.

aggregate size. 4. REINFORCEMENT (a) High Yield bars to be square twisted cold formed bars to BS4461 and are marked 'Y'on these drawings.

strength of 25N/mm^2 at 28days with 20mm maximum

(b) Reinforced concrete to have a minimum works cube

2. Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass concrete. 3. CONCRETE MIXES (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28days with 40mm Aggregate size.

1.Excavation to be confirmed by the Engineer before concrete blinding is laid.

200 150

B1 SITE DIMENSIONS

B1

B1

50 230

2 C2

200 150

C1 B1

SITE DIMENSIONS

B1 50 230

B1

5000

5000

5000

TRUSS T1 5000

5000

NOTES:

TRUSS T1

TRUSS T1

TRUSS T1

TRUSS T1

15000

D 4

3

2

1

TRUSS T1 6

1:50, 1:10 19012008

DRG NO.

................................

JUNE 2010 04

DATE SHEET NO.

Ms OSILO GRACE, P.O.BOX........., TEL..................

AT PLOT............, BLOCK .........., MBALE.

SCALE

DRAWN

DESIGNED

ARCHITECT

TITLE

CLIENT

PROJECT

TEL O77838691,075693987,031261050 PROPOSED WAREHOUSE AND SUPPORT FACILITIES

PLOT 967 MBOGO ROAD KIBULI

STRUCTURAL & CIVIL ENGINEERS

TYP. SECTION THRU RING BEAM

230

2Y16

R8-200C/C

2Y16

6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE CONSTRUCTION

5.MINIMUM COVER TO ALL STEEL IN (i) Foundation, stubcolumns, column bases & ground beams =40mm (ii)Beams =25mm (iii) Slabs = 40mm (iv) Columns =30mm (v) Bot. slab =20mm

(b) Mild steel bars Marked 'R' on these dwgs to be round bars to BS 4483.

aggregate size. 4. REINFORCEMENT (a) High Yield bars to be square twisted cold formed bars to BS4461 and are marked 'Y'on these drawings.

strength of 25N/mm^2 at 28days with 20mm maximum

(b) Reinforced concrete to have a minimum works cube

2. Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass concrete. 3. CONCRETE MIXES (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28days with 40mm Aggregate size.

1.Excavation to be confirmed by the Engineer before concrete blinding is laid.

300

A

5

ROOF AND RING BEAM LAY OUT

30000

5000

TRUSS T1 7

5000

C

.

2x2Y10-17 B

2x3Y10-16-300 T

B.R.C MESH B.S No.A142

6900

5000

2x2Y10-17 B

.

.

8

7

6

5

34Y16-1/R-18-ALT

4

B.R.C MESH B.S No.A142

3

5000

30000

5000

5000

6

5

5000

D 4

3

2985

2

1

REINFORCEMENT DETAILS - SUSPENDED FLOOR SLAB

5000

5000

NOTES:

1:50 , 1:10 19012008

SCALE DRG NO.

DRAWN

DESIGNED

................................

JUNE 2010 02

DATE SHEET NO.

SUSPENDED SLA, BEAMS AND SECTION DETAILS

ARCHITECT

Ms OSILO GRACE, P.O.BOX........., TEL.................. TITLE

AT PLOT............, BLOCK .........., MBALE. CLIENT

PROJECT

TEL O77838691,075693987,031261050 PROPOSED WAREHOUSE AND SUPPORT FACILITIES

PLOT 967 MBOGO ROAD KIBULI

STRUCTURAL & CIVIL ENGINEERS

TYP. SECTION THRU grid A(1-7),D(1-7),7(A-D)

230

2Y16

R8-200C/C

2Y16

6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE CONSTRUCTION

5.MINIMUM COVER TO ALL STEEL IN (i) Foundation, stubcolumns, column bases & ground beams =40mm (ii)Beams =25mm (iii) Slabs = 40mm (iv) Columns =30mm (v) Bot. slab =20mm

(b) Mild steel bars Marked 'R' on these dwgs to be round bars to BS 4483.

aggregate size. 4. REINFORCEMENT (a) High Yield bars to be square twisted cold formed bars to BS4461 and are marked 'Y'on these drawings.

strength of 25N/mm^2 at 28days with 20mm maximum

(b) Reinforced concrete to have a minimum works cube

2. Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass concrete. 3. CONCRETE MIXES (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28days with 40mm Aggregate size.

1.Excavation to be confirmed by the Engineer before concrete blinding is laid.

400

2x3Y10-16-300 T

5000

2

1

8

7

B

6

5000

5

M

4

B.R.C MESH B.S No.A142

3

A

M

2

1

.

7

LEVEL 1

18

18

C/C

985

1000

1200

985

1000

1200 LEVEL 2 13Y12-06-200C/C

2Y16-02

25R8-01-200C/C

3Y16-02

5000

Y

Y

-Gauge 28 roof sheeting -40x40x3mm ties and struts -60x40x3mm rafter and tie beam -150mm Z-purlins

Y12-01

Y12-02

4Y20-03

TRUSS T1

1500

03

03

03

03

C2

04

10Y12-01-150C/C

TYP. SECTION THRU COLUMN BASE B1

1008 15000

1023

B E A M ( 230 X 500) on grid 1(A-D), grid 2(A-D).

1Y16-04-at column connection

00

X

Z

X

Z

04

04

50

2Y16-03

55

5mm welds

190

400

3Y16-02

50 55

25R8-01-200C/C

5000

04 04

02

60x30x3mm SHS from Truss 1

Z

04

04

04

02

02

230

02

02

01

SECTION THRU X-X

01

SECTION THRU Z-Z

04

230

5mm PLATE 18Ø HOLES TO RECEIVE 4M16mm J-BOLTS

Z

X

4Y20-02

X

4Y16-04

Plan A connection detail.

05

04

400

05

03

02

02

SECTION THRU Z-Z

04

6Y16-04+2Y12-05

1Y16-04-at column connection

14R8-01-175C/C

2Y16-02

25R8-01-200C/C

18

6-2

03

400

6Y16-02+2Y12-03

02

02

SECTION THRU X-X

02

200

3Y16-02

5000

18

B.S No.142 B.R.C MESH

18

0 1000

985

2400

2-0

Y12-10 Y12-09

2400

Y12-08

Y1

COLUMN BASE B1 (1500X1500) 6 No.s thus.

03 04

230

X

18

985

Y12-07

24

1327 10Y12-01-150C/C

05

03

38 125 37

X

18

1991

900

300mm. 150mm. 150mm. LANDING 9Y12-06-200C/C

6Y16-03+2Y12-05

03

05

C1

NOTES:

1.Excavation to be confirmed by the Engineer before concrete blinding is laid.

2. Weak pockets of bearing strata to be dug out and filled with 1:4:8 mass concrete. 3. CONCRETE MIXES (a) Mass concrete to have a minimum works cube strength of 15N/mm^2 at 28days with 40mm Aggregate size.

(b) Reinforced concrete to have a minimum works cube

strength of 25N/mm^2 at 28days with 20mm maximum

aggregate size. 4. REINFORCEMENT (a) High Yield bars to be square twisted cold formed bars to BS4461 and are marked 'Y'on these drawings.

(b) Mild steel bars Marked 'R' on these dwgs to be round bars to BS 4483.

5.MINIMUM COVER TO ALL STEEL IN (i) Foundation, stubcolumns, column bases & ground beams =40mm (ii)Beams =25mm (iii) Slabs = 40mm (iv) Columns =30mm (v) Bot. slab =20mm

03

03

TEL O77838691,075693987,031261050

PROPOSED WAREHOUSE AND SUPPORT FACILITIES

FDNS,BEAMS,COLUMNS,TRUSS AND SECTION DETAILS

Ms OSILO GRACE, P.O.BOX........., TEL..................

AT PLOT............, BLOCK .........., MBALE.

CLIENT

SCALE

19012008

1:25,1:10

SHEET NO.

DATE

03

JUNE 2010

................................

DRG NO.

DRAWN

DESIGNED

ARCHITECT

TITLE

PROJECT

PLOT 967 MBOGO ROAD KIBULI

STRUCTURAL & CIVIL ENGINEERS

TYP. SECTION THRU Y-Y grid 1(A-D),2(A-D)

230

02 02 02

01

03 04 03

TYP. SECTION THRU X-X grid 1(A-D),2(A-D)

230

02 02 02

01

6. GEOTECHNICAL INVESTIGATIONS SHOULD BE DONE BEFORE CONSTRUCTION

200

125

/C 0C

XR8-04-175C/C 03

COLUMN TYPE C2 (6No.) 230x230mm

14R8-01-175C/C

125

-20

Y12-02 Y12-01

12R8-01-175C/C

COLUMN TYPE C1 (14No.) 400x230mm

12R8-01-175C/C

3414

1630

-06

6Y12-10-200c/c

976

900

6Y12-08-200c/c

1577

2400

6Y12-05-200c/c

STAIR CASE 1 PLAN

2 Y1

Y12-04

Y12-05

TREADS RISERS WAIST

2400

75Y12-06-200C/C

Y12-03

29

6Y12-07-200c/c

SECTION THRU MAXPAN SLAB M-M

06

6Y12-04-200c/c

SITE DIMENSIONS

1500

1500

COLUMN BASE B1 (1500X1500) 14 Nos thus.

230

230

300

200

300

300 2000

200 150

SITE DIMENSIONS 50 300 1500

300

2000

400

2300

15075

230 230

10Y12-02-150C/C

6Y12-09-200c/c

TYP. SECTION THRU COLUMN BASE B1

XR8-04-175C/C

6Y12-03-200c/c

572

06

1200

A

6Y12-01-200c/c

Y12-02

06

06

690

SITE DIMENSIONS

400 2300 15075

6Y12-02-200c/c

SECTION THRU STAIRCASE 1 PLAN

10Y12-02-150C/C

200 150

50 300

1350 1350 Y12-01 06

200 150

50 230

1100