PROJECT: Proposed 2-Storey House (Peralta Residence) OWNER: Apolinario B. Peralta LOCATION: Lot 8 Blk 38 Sub-Blk C 155 KKK St. Brgy 150 Bagong Barrio Caloocan City Date: December 12, 2016 BILL OF MATERIALS Item No. Description Unit 1.0 lot GENERAL REQUIREMENTS Signed and sealed plans and other documents

Qty 1

Rate 10,000.00

Amount 15,000.00

lot

1

5,000.00

5,000.00

cu.m cu.m cu.m cu.m cu.m cu.m

34 11 9 33 3.5 13

75.00 75.00 75.00 100.00 500.00 75.00

2,550.00 825.00 675.00 3,300.00 1,750.00 975.00 10,075.00

kg kg kg

770 247 93

22.50 22.50 22.70

17,325.00 5,557.50 2,111.10

kg kg

512 49

22.50 22.70

11,520.00 1,112.30

kg kg

511 33

22.50 22.70

11,497.50 749.10

kg kg

809 50

22.0 35.0

17,798.00 1,750.00 69,420.50

necessary for building and construction permit 2.0

3.0

SITE PREPARATION Mobilization, site clearing and layout EARTH WORKS 2.1 Excavation Foundation Wall footing Septic Tank 2.2 Backfill/Compaction 2.3 Gravel Base 2.4 Soil debris disposal Sub-total (Earth works)

STRUCTURAL WORKS 3.0

4.0

REINFORCEMENT BARS 3.1 Foundation/Footing 20mmø x 6.0m Gr.60 Rebars 16mmø x 6.0m Gr.60 Rebars 10mmø x 6.0m Gr.60 Rebars 3.2 Column 16mmø x 6.0m Gr.60 Rebars 10mmø x 6.0m Gr.60 Rebars 3.3 Beam/girders 16mmø x 6.0m Gr.60 Rebars 10mmø x 6.0m Gr.60 Rebars 3.4 Slab 10mmø x 6.0m Gr.40 Rebars 3.6 GI Tie wires #16 Sub-total (Reinforcement bars) CONCRETE WORKS Class A mixture 1:2:4 @ 50 Kg cement bag

Page 1 of 19

4.1 Foundation/Footing Cement Sand Gravel 4.2 Column Cement Sand Gravel 4.3 Beam/Girders Cement Sand Gravel 4.4 Slab (Ground and second floor) Cement Sand Gravel Sub-total (Concrete works) 5.0

6.0

7.0

8.0

9.0

bags cu.m cu.m

68 5 10

210.00 550.00 1,100.00

14,280.00 2,750.00 11,000.00

bags cu.m cu.m

68 3.5 7

210.00 550.00 1,100.00

14,280.00 1,925.00 7,700.00

bags cu.m cu.m

18 2 3

210.00 550.00 1,100.00

3,780.00 1,100.00 3,300.00

bags cu.m cu.m

30 2 4.25

210.00 550.00 1,100.00

6,300.00 1,100.00 4,675.00 72,190.00

EXTERIOR WALLS CHB 6" Cement for mortar & plaster Sand for mortar & plaster 9mmø x 6.0m Gr.40 Rebars Sub-total (Exterior walls)

pcs bags cu.m kgs

2311 179 19 442.7

12.00 210.00 550.00 20.00

2,311.00 37,590.00 10,450.00 8,854.00 59,205.00

INTERIOR WALLS CHB 4" Cement for mortar & plaster Sand for mortar & plaster 9mmø x 6.0m Gr.40 Rebars Sub-total (Interior walls)

pcs bags cu.m kgs

565 26 3 175

10.00 210.00 550.00 20.00

5,650.00 5,460.00 1,650.00 3,500.00 16,260.00

lot

1

25,000.00

25,000.00

lot

1

3,000.00

3,000.00

lot

1

5,000.00

5,000.00

lot

1

2,000.00

2,000.00 10,000.00

sets

2

4,540.00

9,080.00

FORMWORKS Ordinary plywood, 2"x2"x12' and hardware accessories PLUMBING SYTEM Sewerage (PVC pipes) Water (PVC Blue schedule 40 pipes, gate valve & check valve) Drainage (PVC pipes) Sub-total (Plumbing system) TOILET & KITCHEN ACCESSORIES Water Closet

Page 2 of 19

Lavatory Shower head Single bowl kitchen sink Miscellaneous items Kitchen countertop Sub-total (Toilet & Kitchen) 10.0

ELECTRICAL WORKS Lights fixtures, switch, outlet, fuse box, electrical wires and miscellaneous items

11.0 PAINTING WORKS 11.1 Exterior Wall Paint Acrytex primer 1705 (16 Liters/can) Full putty (Acrytex cast) Spot putty (Acrytex cast) Topcoat Wallguard (16 Liters) Acrytex putty reducer Acrytex paint reducer 11.2 Interior Wall Paint Masonry neutralizer 44 Primer (Permacoat flat latex /16 Liters) Full putty (Masonry putty/ 4 Liters) Spot putty (Masonry putty/ 4 Liters) Topcoat (Permacoat latex/16 Liters) 11.4 Concrete Ceiling Paint Masonry neutralizer 44 Primer (Permacoat flat latex /16 Liters) Full putty (Masonry putty/ 4 Liters) Spot putty (Masonry putty/ 4 Liters) Topcoat (Permacoat latex/16 Liters) 11.5 Roof slab water proofing Waterproofing at approx. 2 coats (Plexibond #7760) Portland cement Acrytex primer 1705 (4 Liters/can) Putty (Acrytex cast) Topcoat (Wallguard) (4 Liters/can) Acrytex reducer Sub-total (Painting works) ARCHITECTURAL WORKS 12.0 DOORS & JAMBS D-01 Single swing panel type door 0.80 x 2.05m D-02 Single swing panel type door 0.70 x 2.05m

Page 3 of 19

sets sets sets lot lot

2 2 2 1 2

2,100.00 5,300.00 1,750.00 1,500.00 7,000.00

4,200.00 10,600.00 3,500.00 1,500.00 14,000.00 42,880.00

lot

1

15,000.00

15,000.00

can gal gal can gal gal

3 16 10 4 3 3

2,713.00 435.00 435.00 2,422.00 350.00 350.00

8,139.00 6,960.00 4,350.00 9,688.00 1,050.00 1,050.00

Liters can Liters Liters can

1 4 23 14 6

120.00 2,419.00 509.00 509.00 2,657.00

120.00 9,676.00 11,707.00 7,126.00 15,942.00

Liters can Liters Liters can

1 1 7 4 2

120.00 2,419.00 509.00 509.00 2,657.00

120.00 2,419.00 3,563.00 2,036.00 5,314.00

Liters

9

720.00

6,480.00

bag can gal can gal

1 2 2 4 1

210.00 580.00 435.00 2,422.00 350.00

210.00 1,160.00 870.00 9,688.00 350.00 108,018.00

set set

2 4

3,000.00 1,000.00

6,000.00 4,000.00

13.0

14.0 15.0

16.0

D-03 Single swing panel type door 0.60 x 2.05m WINDOWS W-01 6mm clear glass window with aluminum frame 1.20x2.20 m W-02 6mm fixed clear glass window with PVC awning frame & grilles) 0.60 x 1.15m W-02 6mm fixed clear glass window with PVC awning frame & grilles) 0.60x0.60m FLOOR TILES 12x12 Floor tiles BATHROOM TILES 8x8 Floor tiles 8x12 Wall tiles Steel works for stairs & balcony Sub-total (for architectural works)

set

2

750.00

1,500.00

set

8

2,500.00

20,000.00

set

2

1,800.00

3,600.00

set

1

900.00

900.00

pcs

675

60.00

40,500.00

pcs pcs lot

123 295 1

12.50 20.70 25,000.00

1,537.50 6,106.50 25,000.00 109,144.00

MATERIALS COST LABOR COST

527,117.50 210,847.00

GENERAL TOTAL AMOUNT Notes: Materials cost are estimated based on plan. Any changes that may occur during construction may affect the cost. Architectural materials are of standard designs. The owner can change the

768,039.50

specifications based on his desires and may cause mark up of cost and labor. Labor cost may vary from the estimated amount depending on the skills of the laborer and may increase or decrease accordingly if any alterations are made.

Prepared by: ERNANE D. RITA Civil Engineer License # 0093190 PTR # MOB0670430 Issued at Marilao, Bulacan

Page 4 of 19

L

W

H

EXCAVATION foundation

1.5

1.5

footing footing

0.2 0.2

1.3 1.3

2

1.5

Septic Tank L

W 16

gravel base

backfill/compaction

No.of items

VALUE

UNIT

10

33.75

cu.m

2 5

6.708 3.9 10.608

cu.m cu.m

2.8

1

8.4

cu.m

0.05

25% 0.70

3.50

cu.m

25% 8.5895

42.9475

1.5 12.9 3

T 3.5

Vexcav 44.358

Vconc 10

CONCRETE VOLUME W H No.of items 1.5 1.5 0.3 10

L FOOTING

0.2 0.2

WALL FOOTING

0.4 0.4

3 12.9

5 2

Total Volume cement sand gravel SLAB ON GRADE Slab Volume roof slab

cement sand gravel

Concrete proportion x Vol 7 0.5 1 15.15 14.65 14.65

1.2 2.064 3.264 10.014

70.098 5.007 10.014

3.5

0.1

5.3025

3.5 3.5

(Stairwell) 0.2 0.56 0.2

9.695 10.255

Concrete proportion x Vol 1.4 0.1 0.2

0 0 0

column @ 2-storey D

VALUE 6.75

W

H

No. Of Col

UNIT cu.m

cu.m

0.45 0.2 7.7 Concrete proportion x Vol 7 0.5 1

Volume cement sand gravel

10

6.93

48.51 3.465 6.93

column @ 5-storey D W 0.45 0.25

Volume

H

No. Of Col 20.1 10

22.6125

D

W H No. Of Beam 0.2 0.4 3.1 10 Concrete proportion x Vol 7 17.36 0.5 1.24 1 2.48

BEAM Volume cement sand gravel

2.48

CHB 6" Exterior wall L ground

2nd

Vertical bars Horizontal #of pcs of bars unit weight

H

Opening

lef right front back

13.65 13.65 3.1 3.1

3.2 3.2 3.2 3.2

lef right front back

13.65 13.65 3.1 3.1

2.7 2.7 2.7 2.7

0.72 4.095 2.64 0.72 1.72 2.88

36.135 36.855 6.65 5.49

Total # of chb Total area Mortar cement sand plaster cement sand Total cement total sand

393.78375 317.985 711.76875 118.62813 119 442.68

452 461 83 69 2311 184.875 148.26975 15.60345 28.101 2.958 176.37075 18.56145

bathroom tiles

Floor tiles L GROSS FLR AREA

Area # of chb per sqm 43.68 546 42.96 537 5.825 73 7.28 91

W 13.65

3.1

AREA 84.63

toilet wall

2.65

1.2

area without tiles

driveway toilet stairwell toilet 2 total area 300x300 tiles

5.5 2.65 3.5 1.6

3.1 0.9 0.8 1.4

-17.05 -2.385 -2.8 -2.24 60.155 668.38889

door opening toilet 2 wall toilet toilet 2 floor area 8x8 tiles wall area 8x12 tiles

0.9 0.7 1.6 1.4 2.65 1.6

1.2 1.2 1.2 1.2 0.9 1.4

REBARS FOOTING 20 pcs bars @ 20mm each footing Length of cut Total length Unit weight of 20mm bars No of footing pcs of bars @ 6m Total weight REBARS TIE BEAM 4 - 16mm L FTB-1 3000 FTB-2 5000 FTB-3 1450 FTB-4 2500 FTB-5 2300

1560 31200 2.466 10 52 769.392

No.

10mm stirrups @300 Cut Total Length stirrups 10 5 3096 61920 10 2 5096 40768 16.666667 17 2 1546 12368 4.8333333 5 8.3333333 2 2596 20768 8 2 2396 19168 7.6666667 8

50 34 10 16 16 126

Total length Unit weight of 16mm bars pcs of bars @ 6m say Total weight

154992 1.578 25.832 26 246.168

Total length Unit weight pcs of bars @ 6m say Total weight

151200 0.616 25.2 25 92.4

REBARS COLUMN 4 - 16mm bars

10mm ties @ 200

Length (assume splicin 8 No. 10 Unit weight 1.578 pcs of bars @6m 53.333333 say 54 Total weight 511.272

Length No. Unit weight pcs of bars @6m

1.2 400 0.616 80

Total weight

49.28

REBARS BEAM 4 - 16mm B-1 B-2 B-3 B-4 B-5

L 3000 5000 1450 2500 2300

No.

length of cut 10 3096 4 5096 4 1546 4 2596 4 2396

123840 81536 24736 41536 38336

10mm stirrups @300 stirrups 10 10 16.666667 17 4.8333333 5 8.3333333 8 7.6666667 8

100 40 40 40 40

GB-1

3000

16mmø

1

3096

12384

Total length Unit weight pcs of bars @6m say Total weight

SLAB REINFORCEMENT Span S1 3.1 S2 3.5 S3 3.1 S4 3.1 S5 3.1

322368 1.578 53.728 54 511.272

No. 1.6 2.3 1.75 2.8 5.5

10

Area 1 1 2 4 1

4.96 8.05 10.85 34.72 17.05

Total length Unit weight pcs of bars @6m Total weight

TOTAL WALL AREA

6.36

2.9 0.8 2.9 2.9 0.8 0.8 2.9 0.8 2.2 2.2 2.9 2.9 2.9 -0.7 2.9 2.9 -0.7

8.99 -1.68 Vertical bars 8.99 Horizontal 2.9 -1.68 #of pcs of bars -1.68 17.11 unit weight -1.68 -2.64 -2.64 7.685 2.9 2.9 -1.47 4.64 4.06 -1.47

33.264

219 0.616 809.424

Total # of chb 0 0 0 0 119 442.68

Mortar plaster Total cement total sand Vertical bars Horizontal #of pcs of bars unit weight

45.235

Interior paint

10 270 324 0.616 54

# of bars per sqm @ 200 spacing 14.2848 15 23.184 23 31.248 32 Tie wire per sqm 99.9936 100 total area 49.104 49

pcs of bars @6m Unit weight Total weight

CHB 4" Interior wall L H BR-1 3.1 DOOR -2.1 BR-1 3.1 1 DOOR -2.1 -2.1 HALLWAY 5.9 DOOR -2.1 WINDOW -1.2 -1.2 TOILET 1 2.65 1 1 DOOR 2.1 TOILET2 1.6 1.4 DOOR 2.1

10

275.345

132.53855 149.2755 281.81405 46.969008 47 174.84

2.16 -1.68 3.84 6.72 2.385 2.24 4.625 115.625 17.4 290

ceiling paint

84.63

2.88

Tie wire per sqm

0.185 34.72 6.4232

Total # of chb

565

cement sand cement sand Total cement

18.81776 1.981293 6.87572 0.72376 25.69348 2.705053

PROJECT: Proposed 2-Storey House (Peralta Residence) OWNER: Apolinario B. Peralta LOCATION: Lot 8 Blk 38 Sub-Blk C 155 KKK St. Brgy 150 Bagong Barrio Caloocan City Date: December 12, 2016 DESIGN ANALYSIS OF 2-STOREY RESIDENTIAL BUILDING Material properties Concrete fc' Ec Steel

20 to 35 MPa 4700√fc'

Unit Weight 23.60 KN/m3 fy 275 to 415 MPa Es 200000 Mpa

Loads Uniform live load for residential Minimum roof live load Dead Loads

2000 Pa 700 Pa

Load Cases U = 1.4 DL + 1.7 LL U = 1.30 DL + 1.7 LL + 1.10 E DESIGN OF SLAB One way Two Way Spacing of bars

m = S/L < 0.50 m = S/L > 0.50 S = Asb/Ast

tmin tmin smin smax

L/24 L/33 100 mm 2h or 300 mm

Slab # 1 Short span Long Span

1.65 3.1

m tmin

0.532 > 0.50 0.094

Two way slab

Slab # 2 Short span Long Span

2.1 3.5

m tmin

0.600 > 0.50 0.106

Two way slab

Slab #3 Short span Long Span

1.95 3.1

m tmin

0.629 > 0.50 0.129

Two way slab

Slab #4 Short span Long Span

3 3.1

m tmin

0.968 > 0.50 0.094

Two way slab

Slab #5 Short span Long Span

3.1 5.3

m tmin

0.585 > 0.50 0.161

Two way slab

Use 200mm for all slab thickness Use 10mm bars @ 200mm spacing both ways

Cantilever slab Short span 1 Long Span 3.3 Assume as simply supported beam Mu = WuL2/8 Use 8 - 10mmø bars Quick check for

m tmin

1.95 As = øMn = As4d =

0.303 < 0.50 0.100

One way slab

314.16 251.33

ρ = As/bd

0.0016 Check for moment capacity of beam & reinforcement ratio a = Asfy/(0.85*fc'*b) a= 38.346 j = (d-0.5a)/d j= 0.904 c = a/ẞ1 ẞ1 = 0.85 c= 45.113 Ɛt = 0.003(d-c)/c ≥ 0.005 Ɛt = 0.010 > 0.005 ø = 0.90 if tension controls øMn = øfyAsjd øMn = 212.18

ρbal = 0.85*(87000ẞ fc')/[fy(87000+fy)] 1

ρbal = 0.03465397 > ρ

Tension controls

Safe

Use 200mm for all slab thickness Use 10mm bars @ 150mm spacing both ways DESIGN OF BEAMS Using typical beam with the longest span & most load d 342 h 400 b 200 L 5300 Dead Load Weight of beam Weight of Slab Weight of exterior wall

10.01 77.55 47.49 135.04 192.46

U = 1.4 DL + 1.7 LL Assume a simply supported beam Mu = WuL2/8

675.78

Use 4 - 16mmø bars Quick check for

As = øMn = As4d =

791.84 1,083

ρ = As/bd

0.012 Check for moment capacity of beam & reinforcement ratio a = Asfy/(0.85*fc'*b) a= 132.219 j = (d-0.5a)/d j= 0.807 c = a/ẞ1 ẞ1 = 0.85 c= 155.551 Ɛt = 0.003(d-c)/c ≥ 0.005 Ɛt = 0.004 < 0.005 ø = max (0.48 + 83Ɛt)/0.65 ø= 1.20 ø = 0.90 if tension controls øMn = øfyAsjd øMn = 1,085.79

ρbal = 0.85*(87000ẞ fc')/[fy(87000+fy)] 1

ρbal =

Compression controls

0.034654 >

ρ

Safe

Mu cap = ø (M1+M2) M1 = 0.85fc'ab(d-a/2) M2 = Asfy(d-d')

M1 = 1240.2483 M2 = 190.59589

Mu cap = ø (M1+M2)

1,216 > Mu Safe Use 200x400mm typical beam with 4-16mmø bars DESIGN OF STIRRUPS Check the shear capacity of simply supported beam Vu = Wul/2 Use 10mmø bars Vc = √fc*bd/6 or 0.70bd/6

Vu = 510.02324 whichever is smaller Vc = 50.98235 7.98

Vs = Avfyd/s Smax = 3Avfy/b S = d/4 Check if

Vs = 22.8 Smax = 488.6625 S= 85.5

Vu > 1/2 ø Vc Vu > 1/3 √fc*bd

Vu > Vu >

21.67 Safe 101.96 safe

Spacing of stirrups shall be the smallest of L/4, 300 or Smax Use 10mmø stirrups @ 300mm spacing DESIGN OF COLUMN Use typical column d 342 b 200

h L

400 4200

Use the loads calculated for slab and beam design Pu = 192.46 Mu = 675.78 Check the slenderness ratio of column Long column not braced against sideways Klu/r > 22 Long column braced against sideways Klu/r > 40 Use k = 1.0 for column unrestrained at both ends 0.0011 r = √Ig/Ag Ig = bh3/12 0.08 Ag = b*h Klu/r = Check eccentricity e = M/P ≤ 15+0.03*h Check steel ratio Use 6 - 16mmø bars

29.10 >22

e=

As =

3.51125 < 15+ 0.03h

1187.76

ρ = As/Ag

ρ=

0.014847 > 0.01 < 0.08 Spacing of ties 16øV or 48ø whichever is smaller Using 10mmø bars 16ø = 256 48ø = 480

Safe Safe

Use typical column 200x400mm with 6 - 16mmø bars DESIGN OF FOOTING Depth of foundation Footing size

b h

Type of soil Allowable pressure coefficient

1500 1.5 d 1.5 A Class material #3 from NSCP 100 0.35

0.3 2.25

Assume an eccentrically loaded column Pmax = 2P/3b(h/2-e) e>L/6 P= 96.24 e= 0.55 Pmax = 213.86 Determine safe area of footing 2.14 Afooting = P/Soilpressure=
Mu = 64.15915307

øfc'bd2 = 2.295 Mu = 1.02* (w-0.59w2) = 1.02w - 0.602w2 69.506 = 1.02w - 0.602w2 Compute for w w= 0.28

ρ = wfc'/fy ρmin = 1.4/fy

0.013728224 0.003373494

Safe Safe

Use ρ = 0.0137 As = ρbd = 6,177.70 Use 20mmø bars (∏/4)d^2 * N = As N= 19.6642 Use 10 - 20mmø bars both ways

Prepared by: ERNANE D. RITA Civil Engineer License # 0093190 PTR # MOB0670430 Issued at Marilao, Bulacan

SCHEDULE OF BEAM BEAM MARK

B-1 B-2 B-3 B-4 B-5 GB-1

DIMENSION B D

200 200 200 200 200 200

400 400 400 400 400 250

LEFT SUPPORT TOP BOT 2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø

2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø

REINFORCEMENT MIDSPAN TOP BOT 2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø

3-16mmø 4-16mmø 3-16mmø 3-16mmø 3-16mmø 2-16mmø

RIGHT SUPPORT TOP BOT 2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø

2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø 2-16mmø

STIRR

Related Documents

2 Storey Residential
January 2021 0
2 Storey 2cl
January 2021 2
2 Story Residential
March 2021 0

More Documents from "katherine"

2 Storey Residential
January 2021 0
February 2021 2
February 2021 2
Azenath Manson
January 2021 1
January 2021 1