ITEM

DESCRIPTION

UNIT

QTY

RATE (RM)

AMOUNT (RM)

LABOUR AND TOOLS ONLY Pg 7.6/34

ELEMENT NO.6 : ROOF CLASS G : CONCRETE ANCILLARIES Cement and sand (1:3) screed, 25mm thick

(Normal Mixed -No

expansion joint)

B C Pg 7.8/48

To received waterproofing system To received upturn 300mm high Add.1

m2 m

5,550 326

-

m2

1667

-

m2 m2

2,626 300

-

ELEMENT NO.8 : EXTERNAL WALLS Tenderer to noteThe descriptions for items in the Bills of Quantities/Schedule of Works shall give the main details of the work to be priced but are not intended to detail every factor that will affect the price. The descriptions must be read in conjunction with the Drawings, Method of Measurement and Preambles, Specifications and all other documents forming part of the Contract including complying with all relevant authorities' requirements. All quantities are PROVISIONAL unless otherwise specified. The unit "sum" means "lump sum".

SECTION G: BRICKWORK AND BLOCKWORK Well burnt clay bricks; in cement mortar (1:3) with plasticiser; including lintels, stifferner, bonding ties and damp-proof course as shown on the drawings, described in the Specifications or as otherwise necessary and mesh reinforcement every fourth course A Pg 7.10/56 Add.1

113mm thick wall ELEMENT NO.10 : INTERNAL WALLS Tenderer to note:The descriptions for items in the Bills of Quantities/Schedule of Works shall give the main details of the work to be priced but are not intended to detail every factor that will affect the price. The descriptions must be read in conjunction with the Drawings, Method of Measurement and Preambles, Specifications and all other documents forming part of the Contract including complying with all relevant authorities' requirements. All quantities are PROVISIONAL unless otherwise specified. The unit "sum" means "lump sum".

A B Pg 7.12/70

SECTION G: BRICKWORK AND BLOCKWORK Well burnt clay bricks; in cement mortar (1:3) with plasticiser; including lintels, stifferners, bonding ties and damp-proof course as shown on the drawings, described in the Specifications or as otherwise necessary and mesh reinforcement every fourth course 113mm thick wall 113mm thick box up wall ELEMENT NO.12: WALL FINISHES SECTION S - FLOOR, WALL AND CEILING FINISHINGS IN-SITU WALL AND CEILING FINISHES; EXTERNALLY External plastering consisting of two coats of cement and sand (1:3) finished

with a steel float and including raking out joints of brickwall and hacking concrete surfaces for key on A

20mm thick to brick or concrete surfaces To sides of wall and associated column

m2

2,017

-

m2

6,122

-

IN-SITU WALL AND CEILING FINISHES; INTERNALLY Internal plastering consisting of two coats of cement and sand (1:3) finished with steel float and including raking out joints of brickwall and hacking concrete surfaces for key on F

20mm thick to brick or concrete surfaces To sides of wall and associated column

TOTAL (RM)

-

Related Documents

Contoh Bq
January 2021 2
Piling Bq
March 2021 0
Bq Bajaringan.xlsx
February 2021 1
Segundo Par Bq Nutri
January 2021 1
4a Crim Bq - Finalwpage
February 2021 1
Contoh
February 2021 3