Loading documents preview...
RIVERSIDE DEVELOPMENT ITEM
PILING WORK
DESCRIPTION
UNIT
QTY
RATE
AMOUNT RM
PILING WORKS Notes:-
The contractor’s attention is drawn to boulders, hard and soft rocks, etc. being present on site. He is advised to probe for the presence of obstructions at the position of the piles and remove all obstructions before commencing the piling works. No additional payments or extension of time will be allowed for obstructions encountered during operations. Drive of testing of piles shall be deemed to include the provision of all pile testing equipment on site and dismantling and removing the same on completion of piling works
PILING EQUIPMENT Allow for the provision of all necessary equipment plant, piling frames, and tools an for their transportation to the site handling, assembling dismantling and removal off the site after completion of the piling operations Item
1
50,000.00
50,000.00
Item
1
25,000.00
25,000.00
Item
1
2,500.00
2,500.00
Provide all necessary equipments, hydraulic jack, defection gauges, kentledge, temporary staging, etc. and test on initial test pile to a vertical load test of twice allowable bearing capacity including all extra costs in setting out and driving one pile before commencement of the main piling work.
No
1
1,500.00
1,500.00
Ditto and test a subsequent pile
No
1
1,500.00
1,500.00
Pile Dynamic Analysis (PDA) Test
No
2
1,000.00
2,000.00
Allow for moving and handling equipment plant, etc. about the site as often and wherever necessary for the whole operations including all idling time, etc.
PILING RECORDS Allow for the submission records of the installation of all piles in triplicate dult signed by the contractor's professional Engineer and deliver to the S.O. as the work proceeds
TESTING
To Collection Page 2/1
RM
82,500.00
RIVERSIDE DEVELOPMENT ITEM
PILING WORK
DESCRIPTION
UNIT
QTY
RATE
AMOUNT RM
PILING WORK (CONT'D) PAYABLE LENGTH The installation of approved piles shall be measured from toe level to existing ground level and paid for in linear metre. No additional payment will be made for cut off lengths or extra lengths added to the head of the pile to suit the contractor’s method of working. Rates to Include All labour and materials for the complete pile inclusive of wasteage. Remove all cut off pile from the site. The removal of all obstructions encountered including disposal off site. All driving through rocks, weathered rock, boulders and the like. Re-driving of heaved piles. Replacement of incorrectly driven piles. Replacement of defective/damaged piles and piles failed under test. Normal Wet Weather delays. Standing time for equipment and labour for whatever reasons. Driving in cluster or singly. Dolly and / or shoes including rock shoes. Setting out pile points. As-built drawings of all piled positions.
To Collection
RM
-
Page 1/2 RIVERSIDE DEVELOPMENT
PILING WORK
ITEM
DESCRIPTION
UNIT
QTY
RATE
AMOUNT RM
PILING WORKS (CONT'D) THE FOLLOWING IN PRECAST REINFORCED CONCRETE PILES AS DESCRIBED:Supply and deliver and unload on site 150mm x 150mm precast reinforced concrete piles as described 6.00m long as initial piles with and including all reinforcement, moulds, lifting hooks and plates, bands and all necessary 10mm thick fillet welding No
83
173.40
14,392.20
Ditto 9.00m long as extension piles ditto
No
129
260.10
33,552.90
Ditto 3.00m long as extension piles ditto
No
Handle, transport, and pitch vertical approved initial/ extension prescast square piles in 9m length.
No
Handle, transport, and pitch vertical approved initial/ extension prescast square piles in 3m length.
No
Drive only approved precast concrete square piles to final set required (to maximum 50m depth)
m
1660
10.00
16,600.00
Labour and material for jointing 150mm x 150mm precast reinforced concrete piles by butt weld as described along the cirumferential groove of mild steel and plates of the piles.
No
83
15.00
1,245.00
No
83
48.70
4,042.10
Cut off 150mm x 150mm precast reinforced concrete piles to required level and dispose of suplus length off site and preparing pile head to receive pile cap as described and in accordance to manufacturer's details
To Collection
-
129
100.00
12,900.00
-
RM
82,732.20
Page 2/3 RIVERSIDE DEVELOPMENT
PILING WORK
ITEM
DESCRIPTION
UNIT
QTY
RATE
AMOUNT RM
COLLECTION Page 2/1
82,500.00
Page 2/2
-
Page 2/3
82,732.20
SITE CLEARANCE AND EARTHWORK
RM Page 2/4
165,232.20