CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

3

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

1

2

L

Safety & Supervisor

1

2

L

Safety & Supervisor

2

2

L

Safety & Supervisor

PEKERJAAN NON RUTIN A. Persiapan & Pembuatan Fasilitas sementara

1

Perapihan dan Pembersihan lokasi

Tangan Terkena benda tajam

Luka, Cidera

2

Digigit ular

Luka, Cidera

4

Terkena alat kerja manual

Luka, Cidera

2

Terpapar debu saat pembersihan dan saat excavator menuang sampah ke dump truck

sakit pernafasan

2

ADM : Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan. ENG : Pasang Baricade, tebar garam sekeliling area Permenaker No (menghindari ular) 3 12 H 8 / MEN / 2010 ADM : Pemasangan Rambu "Hand Gloves tentang APD PPE : Pakai sarung tangan dan sepatu boot ADM : Pemasangan Rambu "Hand Gloves dan Training Hand Safety 4 8 M PPE : Pakai sarung tangan dan sepatu boot ADM : Pemasangan Rambu "Gunakan Masker" dan Training Penggunaan APD dan Penggunaan Respirator 3 6 M PPE : Pakai Masker / Respirator 6

M

Permenaker No ENG : Pasang Baricade isolir area 1 / MEN / 1980 ADM : Pemasangan Rambu "Awas Manuver Alat

Terkena manuver alat berat (excavator dan dump truck)

2

Terkena benda tajam (ujung Pemasangan Pagar zinkalum, bendrat, paku) Proyek terbuat dari Zinkalum Terkena alat kerja manual

Terkena benda tajam

Luka, cidera, kematian

4

3 12 H

Luka

2

4

8

M

Luka, cidera

2

4

8

M

Luka

2

3

6

M

Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet.

Permenaker No 8 / MEN / 2010 tentang APD

SKB Menaker & PU No.174/1986

ADM : Pemasangan Rambu "Hand Gloves dan Training 2 Hand Safety PPE : Pakai sarung tangan. ADM : Pemasangan Rambu "Hand Gloves dan Training 2 Hand Safety PPE : Pakai sarung tangan dan sepatu boot. ADM : Pemasangan Rambu "Hand Gloves dan Training Hand Safety 1 PPE : Pakai sarung tangan.

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified Terkena alat kerja manual (terpukul palu, terjepit gegep, tang Luka, cidera dan kunci)

3

4

L

S

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

R

Color

Before

Item

BBS/HSE/General-01 -

6

Permenaker No Hand Safety M 8 / MEN / 2010 PPE : Pakai sarung tangan dan sepatu boot. tentang APD

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

ADM : Pemasangan Rambu "Hand Gloves dan Training

2

3

Pemasangan Pagar Terjatuh dari ketinggian saat Luka, cidera, Proyek dengan pasang pipa perkuatan scaffolding kematian struktur scaffolding atas

4

Tersandung patok stud scaffolding Luka, cidera

2

4

8

M

SKB Menaker & PU No.174/1986

Terjatuh pada lantai yang sama karena lahan tidak rata, lahan miring atau tersandung material

Luka, cidera

2

3

6

M

SKB Menaker & PU No.174/1986

Terkena manuver alat berat keluar Luka, cidera, masuk proyek kematian

4

3 12 H

SKB Menaker & PU No.174/1986

Permenaker No

3 12 H 8 / MEN / 2010 tentang APD

Mob/ Demob Alat Berat dan Kendaraan material

ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Pemasangan Scaffolding . Bekerja di ketinggian sesuai prosedur PPE : Pakai Helm dan Safety Body Harness sesuai Prosedur Pemakaian Safety Body Harness ENG : Patok dipasang safety line / dicat ADM : Pemasangan Rambu " Awas Tersandung" PPE : Pakai sepatu boot. ENG : Lantai dipasang tanda / dicat, Material pasang safety line ADM : Pemasangan Rambu " Awas Tersandung" , PPE : Pakai sepatu boot. ENG : Pasang Baricade isolir area, buat jalur khusus pejalan kaki ADM : Pemasangan Rambu "Awas Manuver Alat Berat" dan Pengaturan akses alat berat. Penempatan Rigger/ Signalman PPE : Pakai Helmet ENG : Pasang Baricade area operasi alat berat

Terkena (terpukul, terjepit) alat berat saat di instal

Luka, cidera, kematian

4

3

SKB Menaker & ADM : Pemasangan Rambu "Awas Manuver Alat Berat" , Petugas harus yang memiliki kualifikasi PU 12 H No.174/1986 khusus dan bersertifikasi.

PPE : Pakai Helmet, sarung tangan.

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

5

Unloading material untuk membangun direksi kit/ bangunan temporary/ bangunan pendukung (kaso, zinkalum roof, tripleks, batu kali, semen, pasir)

6

Unloading kontainer untuk gudang / office

Hazard Risk Identified

Tertimpa material pada saat unloading

Luka, cidera

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

L

S

R

Color

Before

Item

BBS/HSE/General-01 -

3

3

9

M

6

Permenaker ADM : Pemasangan Rambu "Awas Manuver Alat No. M Berat" 09/MEN/2010

Permenaker ADM : Unloading material sesuai aturan Loading and No. Unloading Material 09/MEN/2010 PPE : Pakai Helmet, sarung tangan saat unloading.

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

1

4

L

Safety & Supervisor

1

3

L

Safety & Supervisor

2

4

L

Safety & Supervisor

ENG : Pasang penopang saat meletakan material Terjepit material

Luka, cidera

2

3

PPE : Pakai Helmet, sarung tangan.

ADM : Pemasangan Rambu "Gunakan Masker" dan

Terpapar debu semen

sakit pernafasan

2

3

6

Permenaker Training Penggunaan APD dan Penggunaan No. M Respirator 09/MEN/2010

Terkena Manuver mobile crane membawa kontainer

Luka, cidera, kematian

4

3 12 H

Sling crane putus, kontainer jatuh menimpa pekerja

Luka, cidera, kematian

4

3 12 H

Terjepit/ terhimpit kontainer saat Luka, cidera memposisikan letak

3

3

9

M

PPE : Pakai Masker / Respirator. ENG : Pasang Baricade isolir area ADM : Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, 4 Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman , Crane, lifting & rigging PPE : Pakai Helmet. ENG : Pasang Baricade isolir area Permenaker ADM :Pemasangan Rambu "Awas Manuver Alat Berat" No. 9/MEN/2010 dan Training . Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan 3 Rigger/ Signalman , Menggunakan Crane, lifting & rigging yang dalam kondisi baik dan dilakukan inspeksi secara berkala PPE : Pakai Helmet. ADM : Penempatan Rigger/ Signalman , Crane, lifting 2 & rigging PPE : Pakai sarung tangan.

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

Pemasangan Instalasi Listrik dan Tersengat listrik Penyambungan daya

Cidera, Kematian

4

3 12 H

Pemasangan Instalasi Listrik dan Jatuh dari tangga Penyambungan daya

Cidera

3

3

9

M

Terkena alat kerja manual

Luka, Cidera

2

3

6

M

Tertimpa material atau alat kerja jatuh

Luka, Cidera

3

3

9

M

Terpapar debu semen

sakit pernafasan

2

3

6

M

Terkena benda tajam

Luka, Cidera

2

3

6

M

7

8

Membangun Direksi Keet, workshop, toilet temporary dan gudang

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Work Permit, Pemasangan Rambu "Awas Bahaya Listrik" Standart PUIL 2000 Temporary Panel , Inspection Panel, Dilakukan oleh orang yang sudah memiliki kualifikasi dan bersertifikasi khusus. PPE : Sarung tangan, safety shoes ,helm. ADM : Pemasangan Rambu "Awas Jatuh dari Permenaker Ketinggian" dan Penggunaan dan pemeriksaan tangga No.01/MEN/ pasang tagging tangga / steger 1980 PPE : Pakai Sarung tangan, safety shoes dan helm.

S

R

3

1

3

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

4

L

Safety & Supervisor

1

2

L

Safety & Supervisor

1

2

L

Safety & Supervisor

1

2

L

Safety & Supervisor

ADM : Pemasangan Rambu "Hand Gloves dan Training 2 Hand Safety PPE : Pakai sarung tangan dan sepatu boot. ENG : Pasang baricade lokasi kerja, pasang net / jaring, pasang toeboard scaffold / tepian lantai , pasang tali pada alat kerja 2 ADM : Work at Height Permit sesuai Prosedur Pemasangan Rambu "Awas Ada Kerja Diatas. PPE : Pakai Helm. ADM : Pemasangan Rambu "Gunakan Masker dan Training Penggunaan APD dan Penggunaan Respirator 2 PPE : Pakai Masker / Respirator. Permenaker No.01/MEN/ 1980

Responsibility

L

Color

Operation/Task Location/Area

ADM : Pemasangan Rambu "Hand Gloves dan Training 2 Hand Safety PPE : Pakai sarung tangan.

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

8

Membangun Direksi Keet, workshop, toilet temporary dan gudang

Terpapar adukan semen/ beton ketika memasang dinding direksi Iritasi kulit dan kit, tiolet temporary, mushola dan mata fasilitas temporary lainnya

Membangun Direksi Keet, workshop, toilet temporary dan gudang

Mata dan kulit terkena Cat dan tinner saat mengecat atap asbes dan dinding

Iritasi kulit dan mata

L

2

2

Kebakaran akibat Penggunaan Luka, cidera, tinner untuk campuran cat minyak kematian

4

Tersengat listrik saat penarikan Cidera, dan instalasi listrik untuk bangunan Kematian

4

Terpapar debu asbes untuk atap

2

Asbestosis

S

4

R

8

Color

Before

Item

M

LEGAL

Permenaker REFERENCE No.01/MEN/ 1980

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

R

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

L

ADM : Pemasangan Rambu "Gunakan Masker" dan Training Penggunaan APD dan Penggunaan Respirator 2 PPE : Pakai Masker / Respirator.

ADM : Penanganan Material B3 sesuai dengan Instruksi Kerjal, training MSDS dan menempatkan 3 6 M MSDS pada lokasi kerja dan workshop PPE : Pakai Sarung tangan dan google. ADM : General Permit sesuai Prosedur dan Instruksi kerja, Penanganan Material B3 sesuai Instruksi kerja, training MSDS dan menempatkan MSDS pada lokasi 3 12 H kerja dan workshop, tidak menggunakan bahan didekat sumber panas / sumber api. PPE : Pakai Sarung tangan dan google. ENG : Pasang grounding kabel atau alat, ADM : Electrical & LOTO Permit sesuai Prosedur, Pemasangan Rambu "Awas Bahaya Listrik" Standart PUIL 2000 3 12 H Temporary Panel , Inspection Panel, Pastikan sumber listrik dalam kondisi off . PPE : Pakai Sarung tangan karet, safety shoes dan helm. ENG : Dicat pada kedua sisi atap ADM : Permenaker General Work Permit, Pemasangan Rambu "Gunakan No. 3 6 M Masker" dan Training Penggunaan APD dan 03/MEN/1985 Penggunaan Respirator PPE : Pakai Masker / Respirator.

Responsibility

S

Color

Operation/Task Location/Area

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

9

Activities / Area Membangun Direksi Keet, workshop, toilet temporary dan gudang

Hazard Risk Identified

Terjatuh dari ketinggian saat pemasangan rangka, dinding dan atap

Terkena Manuver Mixer didalam Pengecoran Jalan proyek sementara di dalam proyek dengan Mixer Beton Mata dan kulit terkena beton

L

S

R

Color

Before

Item

LEGAL REFERENCE

Permenaker No

Luka, Cidera, kematian

4

Luka, cidera, kematian

4

3 12 H

Iritasi kulit dan mata

2

3

3 12 H 8 / MEN / 2010 tentang APD

Permen. No. 01/Men/1980

Permenaker No

6

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

S

ENG : Pasang railing dan life line ADM : Work at Height Permit sesuai Prosedur, Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Pemasangan 2 2 Scaffolding. Bekerja di ketinggian sesuai prosedur dan Instruksi kerja yang ada. PPE : Pakai Helm dan Safety Body Harness. ENG : Pasang Baricade isolir area, Pembuatan jalur khusus pejalan kaki ADM : General Work Permit sesuai Prosedur, 3 1 Pemasangan Rambu "Awas Manuver Mixer" Pemasangan Proteksi, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet PPE : Pakai Sepatu Boot Karet, sarung tangan dan google.

M 8 / MEN / 2010

Responsibility

R

Color

Operation/Task Location/Area

4

L

Safety & Supervisor

3

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

tentang APD

INSTAL DAN PENAMBAHAN SECTION TC

1

Terkena manuver alat saat swing Pemasangan/peraki dengan Truck crane tan JIB section / Counter Weigh / Jacking Terkena alat kerja

Luka cedera, meninggal

Luka, cidera

4

3

3 12 H

3

9

M

ENG : Pasang Baricade isolir area seluas rotasi sling. ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Permenaker Training , Pemasangan Proteksi, Prestart Inspection, No. 09/MEN/2010 Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Permenaker No.01/MEN/ 1980

ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot

Berca Buana sakti

Risk Assessment

Operation/Task Location/Area

General Project Activities Project Site

Risk Assessment No. Method Statement

2

Activities / Area

Bising

Hazard Risk Identified

L

S

R

Color

Before

Item

Jatuh dari ketinggian

Luka, cidera, meninggal

4

3 12 H

Alat kerja jatuh mengenai pekerja dibawah

Luka, cidera, meninggal

4

3 12 H

Komplain owner

-

3

3

9

M

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

S

R

Color

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT

Responsibility

ADM : Work at Height Permit sesuai Prosedur, Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Safety & 2 2 4 L Pemasangan Scaffolding, Bekerja di ketinggian sesuai Supervisor dengan prosedur. PPE : Pakai Helm dan Safety Body Harness . ENG : Pasang baricade lokasi kerja, pasang net / jaring, pasang toeboard scaffold / tepian lantai , Safety & pasang tali pada alat kerja 4 1 4 L Supervisor ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Awas Ada Kerja Diatas " PPE : Pakai Helm Permenaker ADM : pekerjaan dibawah pengawasan safety, dilakukan pengukuran bising Safety & No.01/MEN/ 1 2 2 L Supervisor 1980

Terjatuh dari ketinggian saat jacking section dan pemasangan baut

3

Cidera, luka, kematian

Penambahan Tertimpa / Terkena Manuver Sling Section dan Jacking Kematian Mobil Crane

4

4

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H No.01/MEN/ Body Harness" dan Training Penggunaan APD, 1980 Bekerja di ketinggian sesuai dengan prosedur. PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur Pemasangan Rambu "Awas Manuver Alat Berat" dan 3 12 H Training . Pemasangan Proteksi, Prestart Inspection, SKB Menaker & Pengaturan akses alat berat, Penempatan Rigger/ Signalman PU No.174/1986 PPE : Pakai Helmet

3

1

3

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

Sling putus, Pekerja tertimpa material Section

Kematian

4

3 12 H

Terkena manuver alat saat swing dengan Truck crane

Kematian

4

3 12 H

Terkena alat kerja

Cidera / Luka

2

3

Terjatuh dari ketinggian saat jacking section dan pemasangan baut

Cidera, luka, kematian

Tertimpa / Terkena Manuver Sling Kematian Mobil Crane

6

SKB LEGAL Menaker & REFERENCE PU No.174/1986

SKB Menaker & PU No.174/1986

M SKB Menaker & PU No.174/1986

4

3 12 H

4

3 12 H Permenaker No. 09/MEN/2010

Pemasangan Ties ke struktur

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang baricade lokasi kerja ADM : Work at Height Permit sesuai Prosedur t, Pemasangan Rambu "Awas Ada Kerja Diatas " , Pengecekan sling. PPE : Pakai Helm ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training . Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian sesuai prosedur. PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training . Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet

Responsibility

L

S

R

Color

Operation/Task General Project Activities Penambahan 3 Location/Area Section dan Jacking Project Site

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Pemasangan Ties ke struktur Bangunan

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL Permenaker REFERENCE No. 09/MEN/2010

Sling putus, Pekerja tertimpa material Section

Kematian

4

3 12 H

Tertimpa Ties jatuh

Kematian

4

3 12 H

Terkena alat kerja

Cidera / Luka

3

3

M

Permenaker No.01/MEN/ 1980

Tertimpa Alat Kerja jatuh

Luka, cidera, kematian

4

3 12 H

Permenaker No.01/MEN/ 1980

Tersengat listrik

Kematian

4

3 12 H

PUIL 2000

Terkena alat kerja

Luka, Cidera

3

3

SKB Menaker & PU No.174/1986

4

5

9

Pemasangan Daya dan Pengetesan 9

M

Permenaker No.01/MEN/ 1980

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang baricade lokasi kerja ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Awas Ada Kerja Diatas " , Pengecekan sling. PPE : Pakai Helm. ENG : Pasang baricade lokasi kerja ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Awas Ada Kerja Diatas " , Pengecekan sling sesuai dengan prosedur PPE : Pakai Helm ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot ENG : Pasang baricade lokasi kerja ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Awas Ada Kerja Diatas " Pengecekan sling sesuai dengan prosedur PPE : Pakai Helm ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" Standart Temporary Panel , Inspection Panel PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik. ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot.

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terkena / tertimpa assessories / alat kerja 6

7

Cidera / Luka

L

2

S

3

R

6

Color

Before

Item

M Permenaker No.01/MEN/ 1980

Pemasangan Penangkal Petir

Pemasangan pondasi, Rel dan CAR

LEGAL REFERENCE

Terjatuh dari ketinggian

Kematian

4

3 12 H

Terkena manuver Truk Crane / TC memindahkan dan memasang peralatan PH

Luka, Cidera, kematian

4

3 12 H

Permenaker No. 09/MEN/2010

Terkena alat kerja

Cidera / Luka

3

3

M

Permenaker No.01/MEN/ 1980

Tertimpa assesories dan Rel jatuh

Luka, Cidera, kematian

4

3 12 H

Permenaker No.01/MEN/ 1980

9

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang baricade lokasi kerja ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Awas Ada Kerja Diatas " , Pengecekan sling sesuai dengan prosedur PPE : Pakai Helm ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian sesuai prosedur, Pemasangan Scaffolding PPE Helm + tali dagu ENG::Pakai Pasang Baricade isolir dan areaSafety Body Harness . ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training . Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot ENG : Pasang baricade lokasi kerja ADM : Work at Height Permit sesuai Prosedur, Pemasangan Rambu "Awas Ada Kerja Diatas " , Pengecekan sling sesuai dengan prosedur PPE : Pakai Helm

Responsibility

L

S

R

Color

Operation/Task Location/Area

1

3

3

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terjatuh dari ketinggian

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

S

Kematian

4

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Per.05/MEN/19 Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H 85 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian sesuai prosedur, Pemasangan Scaffolding

Cidera / Luka

2

3

6

3

SKB Menaker & Material B3 sesuai dengan Hazardous Material, PU 12 H No.174/1986 training MSDS dan menempatkan MSDS pada lokasi

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

1

2

2ADM L : Hot Work Permit sesuai Prose

2

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

Safety & Supervisor

Pemasangan dan Penambahan Rel Material / Passanger Hoist Terkena percikan las dan radiasi

M

ENG : Pasang Baricade area pengelasan ADM : General Permit sesuai Prosedur , Penanganan

1

2

3

Pengelasan

Kebakaran akibat percikan api dan Kerugian aset, konsleting Listrik kematian

Penambahan Tertimpa assesories dan Rel Section / Tinggi Rel

Penyambungan Daya dan Pengetesan

Tersengat listrik

4

Kematian

4

Cidera / Luka, kematian

4

kerja dan workshop PPE : Pakai Sarung tangan dan google. ENG : Pasang baricade lokasi kerja SKB Menaker & ADM : Work at Height Permit sesuai Prosedur , PU 3 12 H 2 Pemasangan Rambu "Awas Ada Kerja Diatas " , No.174/1986 Pengecekan sling sesuai dengan prosedur PPE : Pakai Helm. ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur, Pemasangan Rambu "Awas Bahaya Listrik" Standart PUIL 2000 3 12 H 2 Temporary Panel , Inspection Panel PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

R

Color

Before

Item

BBS/HSE/General-01 -

9

Permenaker Pemasangan Rambu "Hand Gloves dan Training Hand No. Per 01 Safety /MEN/1980 ttg PPE : Pakai sarung tangan dan sepatu boot. Keselamatan M dan Kesehatan Kerja pada Tempat Kegiatan Konstruksi

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

ADM : General Work Permit sesuai Prosedur ,

4

Membangun Direksi Keet, workshop, toilet temporary dan gudang

Terkena alat kerja manual

Luka, Cidera

3

3

Tertimpa material atau alat kerja jatuh

Luka, Cidera

3

3

9

M

Terpapar debu semen

sakit pernafasan

3

3

9

M

Terkena benda tajam

Luka, Cidera

3

3

9

M

2

3

6

M

Terpapar adukan semen/ beton ketika memasang dinding direksi Iritasi kulit dan kit, tiolet temporary, mushola dan mata fasilitas temporary lainnya

ENG : Pasang baricade lokasi kerja ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Awas Ada Kerja Diatas " , Pengecekan sling PPE : Pakai Helm ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Masker" dan Training Penggunaan APD Penggunaan Respirator PPE : Pakai Masker / Respirator Permenaker ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand No. Per 01 /MEN/1980 ttg Safety Keselamatan PPE : Pakai sarung tangan dan Kesehatan ADM : General Work Permit sesuai Prosedur , Kerja pada Pemasangan Rambu "Gunakan Masker" dan Training Tempat Penggunaan APD Penggunaan Respirator Kegiatan PPE : Pakai Masker / Respirator Konstruksi

Berca Buana sakti

Risk Assessment

Item

Activities / Area

General Project Activities Project Site Hazard Risk Identified

Mata dan kulit terkena Cat dan tinner saat mengecat atap asbes dan dinding

Iritasi kulit dan mata

Kebakaran akibat Penggunaan Luka, cidera, tinner untuk campuran cat minyak kematian

Tersengat listrik saat penarikan Cidera, dan instalasi listrik untuk bangunan Kematian

Terpapar debu asbes untuk atap

Asbestosis

L

2

4

4

2

Color

Operation/Task Location/Area

Permenaker No. Per 01 ttg No. Risk/MEN/1980 Assessment Keselamatan Method Statement dan Kesehatan Before Kerja pada LEGAL Control Measure Tempat REFERENCE S R Kegiatan Konstruksi ADM : General Permit sesuai Prosedur, Penanganan

3

6

M

3 12 H

3

Kepmenaker & Trans No. Kep 75./MEN/ 2002 ttg Pemberlakuan 12 H SNI No. SNI-040225-2000 mengenai PUIL 2000 di tempat kerja

3

Permenaker No. Per.03/MEN/19 82 ttg M Kesehatan dan Keselamatan Kerja Pemakaian Asbes

6

Material B3 Hazardous Material, training MSDS dan menempatkan MSDS pada lokasi kerja dan workshop PPE : Pakai Sarung tangan dan google ADM : General Permit sesuai Prosedur , Penanganan Material B3 Hazardous Material, training MSDS dan menempatkan MSDS pada lokasi kerja dan workshop PPE : Pakai Sarung tangan dan google.

BBS/HSE/General-01 RESIDUAL RISK

S

R

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety

2

4

L

Safety & Supervisor

2

2

L

Safety & Supervisor

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" Standart Temporary Panel , Inspection Panel PPE : Pakai Sarung tangan, safety shoes dan helm anti 2 listrik.

ENG : Dicat pada kedua sisi atap ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Masker" dan Training Penggunaan APD dan Penggunaan Respirator PPE : Pakai Masker / Respirator

Responsibility

L

Color

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT

1

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terjatuh dari ketinggian saat pemasangan rangka, dinding dan atap

5

Pengecoran Jalan Terkena Manuver Mixer didalam sementara di dalam proyek proyek dengan Mixer Beton

Mata dan kulit terkena beton

L

Luka, Cidera, kematian

4

Luka, cidera, kematian

4

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Permenaker PPE : Pakai Sepatu Boot Karet, sarung tangan dan google No. 2 08/MEN/2010

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, 3 12 H Bekerja di ketinggian sesuai prosedur, Pemasangan Scaffolding sesuaisesuai prosedur. PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang Baricade isolir area Permenaker ADM : General Work Permit sesuai Prosedur , No. Per 01 Pemasangan Rambu "Awas Manuver Alat Berat" dan /MEN/1980 ttg Training dan Pemasangan Proteksi, Prestart Keselamatan Inspection, Pengaturan akses alat berat, Penempatan 3 12 H dan Kesehatan Rigger/ Signalman Kerja pada PPE : Pakai Helmet Tempat Permenaker No. Per 01 /MEN/1980; Permenaker No. 08 /MEN/2010

Kegiatan Konstruksi

Iritasi kulit dan mata

2

3

6

M

Pekerjaan Bore Pile Non Rutin

1

Terkena alat kerja manual

Luka, Cidera

3

3

9

Terkena benda tajam

Luka, Cidera

3

3

9

Setting Out

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand M Safety Permenaker No PPE : Pakai sarung tangan dan sepatu boot 8 / MEN / 2010 ADM : General Work Permit sesuai Prosedur , tentang APD Pemasangan Rambu "Hand Gloves dan Training Hand M Safety PPE : Pakai sarung tangan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety Supervisor

Rutin

Terkena manuver alat Bore dan crane service

Luka, cidera, Meninggal

4

3 12 H Permenaker No. 01/MEN/1980

2

Lahan Longsor, alat bore / crane terguling

Kematian, kerusakan aset

4

3 12 H

Tergelincir lumpur / licin

Cidera

2

3

6

3

Permenaker no 1/MEN/1980 ttg Keselamatan 12 H dan Kesehatan Kerja pada Konstruksi Bangunan

Pengeboran dengan Alat Bore

Terperosok dalam lubang

Luka, cidera, kematian

4

M

Permenaker No. 01/MEN/1980

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet ENG : Pasang Pembatas area bore pile, pasang blue sheet area galian / perkuatan area galian dengan mortar ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Manuver Alat Berat" , Pengaturan akses alat berat. ENG : Pasang Baricade isolir area kerja ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Terpeleset " , Area Bore PIle PPE : Pakai Sepatu ENG : Pasang Pagar / Railing area Lubang dan dicat / dipasang safety line ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terperosok " , Awas Area Bore PIle , Bekerja area bore pile , Pasang proteksi PPE : Pakai Sepatu .

Pengeboran dengan Alat Bore

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Operation/Task Location/Area

General Project Activities Project Site

Risk Assessment No. Method Statement

3

Activities / Area

Pemasangan Besi Beton

Hazard Risk Identified

R

Gangguan Kenyamanan, pencemaran air

2

Terkena benda tajam saat pengangkatan rangkaian besi

Luka, cidera

3

3

Terkena swing crane membawa besi

Luka, cidera, Meninggal

4

3 12 H

Terjepit rangkaian besi saat akan dimasukkan kedalam lubang

Luka, cidera

2

Licin akibat pekerjaan Polimer Pekerjaan Polimer

S

Pembuangan tanah dan lumpur hasil galian dan Cleaning

Luka Terkena karat besi

4

L

Color

Before

Item

Infeksi

Cidera

LEGAL REFERENCE

Permenaker No

3

6

M 8 / MEN / 2010 tentang APD

9

M

Permenaker No. 09/MEN/2010

Permenaker No. 09/MEN/2010

3

2

3

3

3

6

9

6

M

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang Car wash, setiap kendaraan yang buang tanah agar dicuci di car wash, Pasang Bak control untuk mengendalikan endapan lumpur ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Keluar Masuk Kendaraan " , Bekerja area bore pile PPE : Pakai Sepatu ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training d Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet ADM : General Work Permit sesuai Prosedur Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan PPE : Pakai Sarung

M

UU no 1 th 1970 tentang keselamatan kerja

M

ENG : Bekas dan sisa polimer ditampung pada wadah khusus ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas UU no 1 th Terpeleset " 1970 tentang PPE : Pakai Sepatu. keselamatan kerja

Responsibility

L

S

R

Color

2

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

Operation/Task Location/Area

General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

4

Pekerjaan Polimer

Hazard Risk Identified

Lahan Longsor alat bentonite rubuh

Kematian, kerusakan aset

Tersengat listrik kabel distribusi ke Pingsan, Trafo Las Kematian 5

L

S

4

3 12 H

4

3 12 H

LEGAL UU no 1 th Control Measure REFERENCE 1970 tentang keselamatan ENG : Pasang Pembatas area kerja kerja

PUIL 2000

Pengelasan rangkaian Besi Terpapar radiasi las

Sakit mata

3

3

Tabung gas meledak

Kebakaran, kematian

4

3 12 H

Terkena bunga api

Luka

3

3

Terkena Manuver Alat Berat

6

R

Color

Before

Item

Pengecoran Beton

Kematian

4

9

9

M

M

UU no 1 th 1970 tentang keselamatan kerja

L

2

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet

Permenaker No. 09/MEN/1980

RESIDUAL RISK

ADM : General Work Permit sesuai Prosedur , 2 Pemasangan Rambu "Awas Manuver Alat Berat". Pengaturan akses alat berat. ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik". Standart 2 Temporary Panel , Inspection Panel PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik ENG : Pasang Baricade area pengelasan

UU no 1 th ENG : Pasang Baricade area kerja 1970 tentang keselamatan ENG : Pasang Baricade area pengelasan kerja

3 12 H

BBS/HSE/General-01 Responsibility

S

R

Color

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

2

ADM : Hot Work Permit sesuai Prose Safety & 4 L Supervisor

& sesuai Prosedur , P ADM : Hot WorkSafety Permit 2 4 L Supervisor Safety ADM : Hot Work& Permit sesuai Prose 2 2 4 L Supervisor 2

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

6

Activities / Area

Pengecoran Beton

Urugan kembali 7 lubang galian

Hazard Risk Identified

L

S

R

Color

Before

Item

Terkena manuver Crane service saat mengangkat Tremi

Luka, cidera, Meninggal

4

3 12 H

Sling crane putus, baket atau alat yang dibawa menimpa orang

Luka, cidera, Meninggal

4

3 12 H

Terkena cipratan beton saat pengecoran lubang

Iritasi mata dan kulit

3

3

Terkena manuver alat berat

Luka, cidera, Kematian

Alat berat terguling karena area galian licin / amblas

Luka, cidera, kematian, kerusakan aset

PEKERJAAN SHEET PILE DAN GROUND ANCHOR

4

4

9

LEGAL REFERENCE

Permenaker No. 09/MEN/1980

M

3 12 H

UU no 1 th 1970 tentang keselamatan kerja

3 12 H

UU no 1 th 1970 tentang keselamatan kerja

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet. ENG : Pasang Baricade area kerja ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet. PPE : Pakai Sepatu Boot Karet, sarung tangan dan google ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet. ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

1

3

3

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

1

Activities / Area

Unloading alat sheet pile

Hazard Risk Identified

L

S

R

Color

Before

Item

Tertabrak truk membawa alat

Luka, cidera, Meninggal

4

3 12 H

Terkena swing crane saat unloading sheet pile

Luka, cidera, Meninggal

4

3 12 H

Terjepit alat

Luka, cidera, Meninggal

4

3 12 H

Tertimpa alat saat unloading

Luka, cidera, Meninggal

4

3 12 H

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet ENG : Pasang Baricade isolir area Permenaker ADM : General Work Permit sesuai Prosedur, No. 09/MEN/2010 Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan ENG : Pasang baricade lokasi kerja Permenaker ADM : Work at Height Permit sesuai Prosedur , No. Pemasangan Rambu "Awas Ada Kerja Diatas , 08/MEN/2010 Pengecekan sling PPE : Pakai Helm

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terkena manuver kendaraan/ trailer membawa material sheet pile

Luka, cidera, Meninggal

L

4

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet

3 12 H

Permenaker No. Per 01/MEN/1980 ttg Keselamatan dan Kesehatan Kerja Pada Tempat Kegiatan Konstruksi

3 12 H

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. Per 01/MEN/1980 Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan ttg Keselamatan dan Kesehatan Kerja Pada Tempat Kegiatan Konstruksi

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

ADM : General Work Permit sesuai Prosedur ,

2

Mobilisasi dan setting out alat press pile

Terjepit saat unloading sheet pile dari Trailer

Kematian

Terjepit saat settingg out sheet pile Cidera

Terkena benda tajam saat setting out dan check seling

Gangguan Kenyamanan, pencemaran air

4

3

3

3

3

9

9

Permenaker No Per M 01/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Tempat M Kegiatan Konstruksi

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Bising Ceceran BBM atau oli ke tanah

3

Sakit pendengaran, tuli Kerusakan properti

L

S

R

3

3

9

M

3

3

9

M

3

Kepmenaker & Trans No. Kep 75./MEN/ 2002 ttg Pemberlakuan 12 H SNI No. SNI-040225-2000 mengenai PUIL 2000 di tempat kerja

RESIDUAL RISK

Control Measure

4

Kepmenaker No. Kep. 51/MEN/1999 ENG : Pasang oil trap

S

R

2

2

4

L

Safety & Supervisor

4

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

ADM 1 : Sediakan oil trap dan pasir atau serbuk kayu. ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" dan Standart Temporary Panel , Inspection Panel PPE : Pakai Sarung tangan, safety shoes dan helm anti 2 listrik

ENG : Pasang Baricade area pengelasan

Terpapar radiasi las

Sakit mata

Tabung gas meledak

Kebakaran, kematian

3

3

9

PP No. 11 tahun 1975 ttg M Keselamatan Kerja terhadap Radiasi

ENG : Pasang Baricade area kerja

Terkena bunga api

Luka

4

3

3

3

ADM : Hot Work Permit sesuai Prose

2

Permenaker 12 H No. 1/MEN/1980 ttg ENG : Pasang Baricade area pengelasan Keselamatan dan Kesehatan Kerja pada 9 M Kontruksi Bangunan

Responsibility

L

PPE : Penggunaan air muff atau air plug

Pemasangan sheet pile Tersengat listrik kabel distribusi ke Pingsan, Trafo Las Kematian

LEGAL REFERENCE

Color

Before

Item

BBS/HSE/General-01 Color

Operation/Task Location/Area

2

4

L

Safety & Supervisor

ADM : Hot Work Permit sesuai Prosedur, Pe Safety & 2 2 4 L Supervisor

ADM : Hot Work Permit sesuai Prose 2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Mata terkena percikan mortar

4

Luka, cedera

L

3

S

3

R

9

Color

Before

Item

M

Aktivitas ground anchor

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

ENG : Pasang cover pada area sumber percikan mortar Permenaker no ADM : General Permit sesuai Prosedur, Pemasangan 1/MEN/1980 Rambu " Gunakan Google " PPE : Gunakan safety goggle, tidak boleh ttg Keselamatan menggunakan safety glass karena tidak cukup aman dan Kesehatan Kerja pada Konstruksi Bangunan

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

1

1

L

Safety & Supervisor

2

1

1

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Hati hati saat bekerja dan gunakan sarung tangan Tersayat atau tertusuk sling anchor Luka, cedera

3

3

Luka, cedera, kematian

4

3

Tanah longsor

Permenaker no 9 M 1/MEN/1980 ttg Keselamatan Pasang blue sheet diatas tanah dan Kesehatan Kerja pada 12 H Konstruksi Bangunan

PEKERJAAN TANAH Rutin

1

Pengalian dengan Terkena manuver Excavator Excavator

Luka, cidera, Meninggal

4

3 12 H

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Awas Manuver Alat Berat" dan No. Training dan Pemasangan Proteksi, Prestart 09/MEN/2010 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

R

Color

Before

Item

L

S

4

3 12 H

Alat berat terguling karena area galian longsor / amblas

Luka, cidera, Meninggal

Mengenai instalasi existing (Kabel Listrik, telepon, gas dll)

Kematian karena setrum, 4 kerusakan aset

3

Area galian longsor, alat terguling menimpa pekerja

Luka, cidera, Meninggal

3 12 H

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

SKB Menaker & Operator harus terlatih, berpengalaman, & cakap PU No.174/1986

L

S

R

Color

Operation/Task Location/Area

Responsibility

2

2

4

L

Logistik

Penyelidikan instalasi existing sebelum penggalian atau dilakukan screening pada area tertentu

Pekerja terperosok lubang area galian karena gelap saat malam atau karena tidak ada railling area galian Area galian longsor, pekerja tertimbun Terkena / tertimbun longsoran tanah

Terkena manuver Excavator saat loading ke truck 2

Penimbunan sementara

4

SKB Menaker & PU 12 H No.174/1986

2

2

4

L

ME

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

SKB Menaker & Pemasangan Rambu dan Pagar Pengaman Area Timbunan sementara PU 1 2 2 L No.174/1986

Safety & Supervisor

Perkuatan lahan/ retaining wall UU no 1 th Pasang penerangan; Pasang railing; Proteksi Bahaya. 1970 tentang keselamatan kerja

Luka, cidera, Meninggal

4

3 12 H

Luka, cidera, Meninggal

4

3 12 H

Luka, cidera

3

3

4

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , SKB Menaker & Pemasangan Rambu "Awas Manuver Alat Berat" dan PU 3 12 H Training dan Pemasangan Proteksi, Prestart No.174/1986 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet

Luka, cidera, Meninggal

9

M

Perkuatan lahan/ retaining wall

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Penimbunan Activities / Area sementara

Hazard Risk Identified

Terkena manuver Truck

Luka, cidera, Meninggal, complain dari client

Terkena manuver crane membawa Luka, cidera, plat baja Meninggal

3

4

Seling putus, plat jatuh menimpa Pemasangan Plat pekerja baja untuk landasan Dump Truk menggunakan Truck Crane Terkena swing truck crane membawa panel

Manuver Truck ke luar lokasi membawa tanah

Luka, cidera, Meninggal

L

4

4

R

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

L

S

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , SKB Menaker & Pemasangan Rambu "Awas Manuver Alat Berat" dan PU 3 12 H 2 2 Training dan Pemasangan Proteksi, Prestart No.174/1986 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Permenaker Prosedur dan Instruksi Kerja tentangCrane, lifting & rigging No. 3 12 H 2 2

4

4

Menabrak kendaraan lain di depan Luka, cidera, proyek meninggal

4

Debu ketika kendaraan melintas saat musim kemarau

3

3 12 H

Permenaker No. 9/MEN/2011

Prosedur dan Instruksi Kerja tentangCrane, lifting & rigging 2 2

Responsibility

R

4

L

Safety & Supervisor

4

L

Safety & Supervisor

4

L

Safety & Supervisor

9/MEN/2010

Luka, cidera, Meninggal

Gangguan pernafasan

S

Color

Before

Item 2

BBS/HSE/General-01 Color

Operation/Task Location/Area

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Awas Manuver Alat Berat" dan Safety & No. 3 12 H 2 2 4 L Training dan Pemasangan Proteksi, Prestart Supervisor 9/MEN/2012 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet SKB Menaker & Pasang rambu speed limit, Petugas traffik mengatur lalu lintas ketika truc keluar Safety & PU 3 12 H 2 2 4 L Supervisor No.174/1986

3

9

M

SKB Menaker & Perkerasan jalan dalam proyek, rambu Limit Speed 10 km/jam, melakukan penyiraman dengan air, paka Safety & PU 2 1 2 L Supervisor No.174/1986

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

4

Activities / Area Manuver Truck ke luar lokasi membawa tanah

Hazard Risk Identified

Kendaraan yang parkir Terkena manuver Dump Truck

5

Luka, cidera, meninggal

Terpeleset saat membersihkan dan Loading Tanah ke meratakan tanah pada pinggiran Cidera truck bak truk

L

4

3

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

S

R

Color

Operation/Task Location/Area

Responsibility

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , SKB Menaker & Pemasangan Rambu "Awas Manuver Alat Berat" sdan Safety & PU 3 12 H 2 2 4 L Training dan Pemasangan Proteksi, Prestart Supervisor No.174/1986 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet UU no 1 th Cek kondisi pinggiran bak dalam keadaan kering/ licin, Gunakan alat bantu . 3

9

M

1970 tentang keselamatan kerja

2

1

2

L

Safety

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

PEKERJAAN PILE CAP Rutin

1

Terkena manuver TC membawa Transport material baket material batako untuk bekisting pile cap (batako, semen dan pasir) Material yang diangkat jatuh karena terlalu penuh

Luka, Cidera, meninggal

4

3 12 H

Luka, Cidera, meninggal

4

3 12 H

Sling putus, baket material jatuh menimpa orang

Luka, Cidera, meninggal

4

3 12 H

Terpapar debu semen

2

Pembuatan dan pemasangan Bekisting

Sakit pernafasan

3

3

9

M

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Permenaker Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman No. 08/MEN/2010 PPE : Pakai Helmet Pakai Sepatu Boot Karet dan pasang rambu Awas Licin Pakai APD ( Sepatu kerja, sarung tangan dan helmet )

Permenaker No. 08/MEN/2010

ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Gunakan Masker" dan Training Penggunaan APD dan Penggunaan Respirator PPE : Pakai Masker / Respirator

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

2

3

Activities / Area Pembuatan dan pemasangan Bekisting

Pembesian

Hazard Risk Identified

S

R

Mata dan kulit terkena semen

Luka, cidera

3

3

9

M

Terkena handtool

Luka, cidera

3

3

9

M

Terkena cangkul saat mengaduk semen manual

Luka, Cidera

3

3

9

3

3

9

M

Tertusuk tajam kawat bendrat

Luka, cidera

3

3

9

M

Terkena tajam ujung besi

Luka, cidera

3

3

9

Terperosok kedalam lubang pembesian

Luka, cidera

3

3

9

3

3

9

M

*)Terkena debu dari besi yang berkarat

Sakit Mata

3

3

9

M

Penggunaan Molen Mata dan kulit terkena semen untuk mengaduk semen

Iritasi mata dan kulit

3

3

3

Pakai Sepatu Boot Karet dan pasang rambu Awas Licin Gunakan alat pada posisi ergonomis

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot s Prosedur BPPP-PK-K3LH-010.

Prosedur BPPP-PK-K3LH-010

M

Luka, cidera

3

RESIDUAL RISK

Control Measure

Permenaker Prosedur BPPP-PK-K3LH-010 No. M 01/MEN/1980

Terjepit rangkaian besi

Sakit pernafasan

Permenaker LEGAL No. REFERENCE 08/MEN/2010

Permenaker No. Pakai APD ( Sepatu kerja, sarung tangan dan helmet ) M 08/MEN/2010

Terkena alat kerja manual (gegep) Luka, cidera

Terpapar debu semen saat memasukan semen ke molen

4

L

Color

Before

Item

BBS/HSE/General-01 -

Permenaker No. 08/MEN/2010

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Perhatikan kondisi besi; Menggunakan Google ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Masker" dan Training Penggunaan APD dan Penggunaan Respirator PPE : Pakai Masker / Respirator

9

M

9

Permenaker No. Prosedur FMJ-PK-K3LH-010 M 08/MEN/2010

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

1

2

L

2

1

2

L

2

1

2

L

2

2

4

L

2

2

4

L

2

2

4

L

2

2

4

L

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

Safety & Supervisor Safety & Supervisor Safety & Supervisor Safety & Supervisor Safety & Supervisor Safety & Supervisor Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Item 4

Activities / Area Penggunaan Molen untuk mengaduk semen

Hazard Risk Identified

L

S

R

Color

Before

Bising

Sakit pendengaran, tuli

3

3

9

M

Terpukul engkol saat menghidupkan molen

Luka, cidera

3

3

9

M

Terkena putaran molen

Luka, cidera

3

3

9

M

Permenaker LEGAL No. REFERENCE 08/MEN/2010

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

S

R

2

2

4

L

2

2

4

L

2

1

2

L

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Faso

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Prosedur FMJ-PK-K3LH-010

UU no 1 th Prosedur FMJ-PK-K3LH-010 1970 tentang keselamatan Prosedur FMJ-PK-K3LH-010 kerja

Responsibility

L

Color

Operation/Task Location/Area

Safety & Supervisor Safety & Supervisor Safety & Supervisor

STRUKTUR KONSTRUKSI BAWAH (BASEMENT)

1

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur, Permenaker Pemasangan Rambu "Awas Manuver Alat Berat" dan No. Training dan Pemasangan Proteksi, Prestart 01/MEN/1980 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Permenaker Training Operator, Pakai sarung Tangan Kulit

Terkena manuver mixer beton

Luka, cidera, meninggal

4

3 12 H

Muka, tangan dan kaki terciprat beton

Iritasi mata dan kulit

2

3

6

M

Terkena cangkul saat meratakan beton

Luka

2

3

6

M

3

3

9

M

9

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. M Hand Safety , Penempatan Rigger/ Signalman 01/MEN/1980

1

3

3

L

Safety & Supervisor

6

Kep. Bekerja shift M 51/MEN/IV/199 9

1

3

3

L

Safety & FASO

Pengecoran lantai Terkena talang mixer saat manuver Luka, cidera beton kerja Terjepit talang mixer saat manuver Luka beton

No. 08/MEN/2010 SKB Menaker & Konsentrasi saat melakukan pekerjaan PU No.174/1986 PUIL 2000

Koordinasi saat manuver talang mixer beton ADM : General Work Permit sesuai Prosedur,

3

3

PPE : Pakai Helmet, Sarung tangan

Getaran akibat vibrator

sakit

2

3

Berca Buana sakti

Risk Assessment

Pengecoran CSA & MEPlantai WORKS PACKAGE PT BUNGASARI FLOUR MILLS kerja INDONESIA MEDAN PROJECT

Operation/Task Location/Area

General Project Activities Project Site

Risk Assessment No. Method Statement

2

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

4

Terjatuh dari mixer

Luka, cidera

2

Sling putus Fabrikasi Bekisting, scaffolding dan pembesian jatuh menimpa pekerja

Luka, cidera, meninggal

4

3 12 H

Luka, cidera, meninggal

4

3 12 H

Terkena material akibat manuver TC

RESIDUAL RISK

Control Measure

Responsibility

R

4

L

Safety & Supervisor

2

L

Safety & Supervisor

2

4

L

Safety & Supervisor

Permenaker Prosedur dan Instruksi Kerja tentangCrane, lifting & rigging No. 2 2 09/MEN/1980

4

L

Safety

L

S

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" dan PUIL 2000 3 12 H 2 2 Standart Temporary Panel , Inspection Panel, Pengecekan Power tools PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. 3 6 M 1 2 Body Harness" dan Training Penggunaan APD, 01/MEN/1980 Bekerja di ketinggian, Pemasangan Scaffolding. PPE : Pakai Helm + tali dagu dan Safety Body Harness. Permenaker Prosedur dan Instruksi Kerja tentangCrane, lifting & rigging

Tersengat listrik akibat kabel yang digunakan untuk distribusi daya ke Luka, cidera, vibrator atau kabel vibrator luka meninggal akibat terinjak / tertimpa material berat dan tajam

Material jatuh saat diangkat dan Pengangkatan dan mengenai pekerja unloading material besi, scaffolding dan bekisting Tangan pekerja terjepit saat pengangkatan dan saat unloading

LEGAL REFERENCE

BBS/HSE/General-01 Color

1

2

No. 09/MEN/1980

ADM : General Work Permit sesuai Prosedur ,

Luka, cidera Luka, cidera, meninggal

SKB Menaker & Pemasangan Rambu "Awas Terjepit " dan Training PU M Hand Safety , Penempatan Rigger/ Signalman No.174/1986

2

3

2

4

L

Safety & Supervisor

4

PPE : Pakai Helmet, Sarung tangan PER/03/MEN/1 Prosedur dan Instruksi Kerja tentangCrane, lifting & rigging 3 12 H 2 2

4

L

Safety & Supervisor

4

L

Safety

6

2

999

ADM : General Work Permit sesuai Prosedur ,

Tangan atau kaki terjepit rangkaian Luka, cidera besi

3

3

9

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. M Hand Safety , Penempatan Rigger/ Signalman 08/MEN/2010

PPE : Pakai Helmet, Sarung tangan

3

Pemasangan rangkaian besi

2

2

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Operation/Task Location/Area

General Project Activities Project Site

Risk Assessment No. Method Statement

Hazard Risk Identified

Tangan tertusuk kawat bendrat 3

Luka

L

S

R

3

3

9

M

RESIDUAL RISK

Control Measure

Responsibility

L

S

R

2

1

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

9

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. M Hand Safety , Penempatan Rigger/ Signalman s 01/MEN/1980

1

2

2

L

Safety & Supervisor

6

Permenaker Tutup lubang dengan papan No. M 01/MEN/1980

2

2

4

L

Safety & Supervisor

9

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. M Hand Safety , Penempatan Rigger/ Signalman 01/MEN/1980

2

2

4

L

Safety & Supervisor

9

SKB Menaker & Prosedur BPPP-PK-K3LH-010 PU M No.174/1986

2

1

2

L

Safety & Supervisor

Pemasangan rangkaian besi Rekan kerja terkena manuver besi yang diangkat/ dipindahkan secara Luka, cidera manual

3

3

9

Tersandung/ tersangkut stek besi

2

3

6

Luka, cidera

LEGAL REFERENCE

Color

Activities / Area

Color

Before

Item

BBS/HSE/General-01 -

Permenaker Training Operator, Pakai sarung Tangan Kulit No. 08/MEN/2010

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , SKB Menaker & Pemasangan Rambu "Awas Manuver Alat Berat" dan PU M Training dan Pemasangan Proteksi, Prestart No.174/1986 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Prosedur dan Instruksi Kerja tentang Proteksi Bahaya PUIL 2000 M ADM : General Work Permit sesuai Prosedur ,

Terkena / terjepit gegep

Luka, cidera

3

3

PPE : Pakai Helmet, Sarung tangan

Terperosok kedalam lubang pembesian

Luka, cidera

2

3

ADM : General Work Permit sesuai Prosedur ,

Terjepit asesories saat pemasangan

Luka, cidera

3

3

PPE : Pakai Helmet, Sarung tangan

Terpukul asesories scaffold saat pemasangan

4

Pemasangan Scaffolding Struktur basement

Luka, cidera

3

3

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

4

5

Activities / Area

Hazard Risk Identified

Terjatuh dari ketinggian saat Pemasangan pasang mainframe dan catwalk Scaffolding Struktur basement

Pemasangan bekisting kolom

L

S

R

Color

Before

Item

Luka, cidera

2

3

6

M

Tertimpa asesoris scaffold yang ditinggal di catwalk, jatuh karena Luka, cidera ada angin kencang atau tertendang pekerja

2

3

6

M

Terjepit kunci scaffolding

Luka, cidera

3

3

Terkena manuver TC membawat material bekisting kolom

Luka, cidera, meninggal

4

3 12 H

Sling putus saat membawa material bekisting kolom

Luka, cidera, meninggal

4

3 12 H

Bagian bekisting terlepas dan jatuh Luka, cidera, menimpa orang meninggal

4

3

LEGAL REFERENCE

SKB Menaker & PU No.174/1986

Per.01/MEN/19 80

9

M

Permenaker No. 01/MEN/1980

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / 1 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness. ENG : Pasang baricade lokasi kerja ADM : Work at Height Permit sesuai Prosedur , 1 Pemasangan Rambu "Awas Ada Kerja Diatas " , Pengecekan sling PPE : Pakai Helm ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " s dan Training 2 Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan 2 Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Prosedur dan Instruksi Kerja tentang Crane, lifting & rigging 2

Responsibility

S

R

Color

Operation/Task Location/Area

2

2

L

Safety & Supervisor

2

2

L

Safety & Supervisor

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

Permenaker No. 2 4 L 01/MEN/1980 SKB Menaker & Rambu awas benda jatuh; Menggunakan Helm bagi semua pekerja PU 12 H 2 2 4 L No.174/1986

Safety & Supervisor Safety & Supervisor

ADM : General Work Permit sesuai Prosedur,

Terjepit bekisting kolom saat pemasangan

Luka, cidera

3

3

9

SKB Menaker & Pemasangan Rambu "Awas Terjepit " dan Training PU M Hand Safety , Penempatan Rigger/ Signalman No.174/1986

PPE : Pakai Helmet, Sarung tangan

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Pemasangan General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Luka, cidera, meninggal

4

Terpukul scaffolding saat transport Luka, cidera dan pemasangan material

3

Terjatuh dari ketinggian

6

7

Pemasangan Scaffolding

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

R

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

L

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Per.01/MEN/19 Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H 2 80 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Permenaker Prosedur dan Instruksi Kerja tentang Mannual Handling No. 3 9 M 2 09/MEN/2010

Terjatuh dari lantai atas akibat hembusan angin kencang

Luka, cidera, meninggal

4

3 12 H

SKB Menaker & PU No.174/1986

Terjatuh dari ketinggian

Kematian

4

3 12 H

SKB Menaker & PU No.174/1986

Terjepit clamp pipa

Luka

3

3

9

M

SKB Menaker & PU No.174/1986

kaki tertimpa pipa saat menyambung

Cidera

3

3

9

M

SKB Menaker & PU No.174/1986

Setting concrette pipe

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness . ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Prosedur dan Instruksi Kerja yang telah tersusun.

Responsibility

S

Color

5 Operation/Task bekisting kolom Location/Area

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terkena Manuver Mixer Beton

8

Pengecoran Beton kolom, dinding dan Keluar masuk mixer beton menabrak kendaraan umum dan plat pribadi

L

Kematian

4

Luka, cidera, meninggal

2

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , SKB Menaker & Pemasangan Rambu "Awas Manuver Alat Berat" dan PU 3 12 H Training dan Pemasangan Proteksi, Prestart No.174/1986 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet SKB Menaker & Flagman / security standby saat keluar masuk PU 3 6 M

S

R

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

No.174/1986

Sakit Bising dari Mixer Beton, Concrette pendengaran, Pump dan Compressor tuli

3

3

9

M

Mata dan kulit terciprat air beton saat Pencucian talang mixer

Iritasi mata dan kulit

2

3

6

M

Mata terciprat air beton saat meratakan beton dari Concrete pipe saat mengecor plat

Iritasi mata dan kulit

9

Permenaker Menggunakan Google M No.08/MEN/20 10

Menggunakan Ear Plug

3

3

Terjatuh dari bucket saat mengecor kolom

Luka, cidera, meninggal

4

3 12 H

Terjatuh dari scaffolding saat mengecor kolom

Luka, cidera, meninggal

4

3 12 H

Permenaker No.08/MEN/20 Menggunakan Google 10

Responsibility

L

Color

Operation/Task Location/Area

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. 2 Body Harness" dan Training Penggunaan APD, Bekerja 01/MEN/1980 di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness . ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. 2 Body Harness" dan Training Penggunaan APD, 01/MEN/1980 Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terjatuh dari atas scaffolding akibat hembusan angin kencang

Luka, cidera, meninggal

L

4

S

R

Color

Before

Item

3 12 H

Terkena cangkul saat meratakan beton

Luka

3

3

9

M

Terpapar getaran dari vibrator

Gangguan motorik

2

4

8

M

Tersengat listrik akibat kabel yang digunakan untuk distribusi daya ke Luka, cidera, vibrator atau kabel vibrator luka meninggal akibat terinjak / tertimpa material berat dan tajam

4

3 12 H

Terkena cipratan beton saat pengecoran kolom

3

3

Iritasi mata dan kulit

9

M

BBS/HSE/General-01 RESIDUAL RISK

LEGAL REFERENCE

Control Measure

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur, Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. Body Harness" dan Training Penggunaan APD, 01/MEN/1980 Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Prosedur dan Instruksi Kerja yang telah disusun. UU no 1 th 1970 tentang keselamatan kerja

Shift kerja

PUIL 2000

Permenaker No. 01/MEN/1980

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

3

3

L

Safety & Supervisor

1

2

L

Safety & Supervisor

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur, Pemasangan Rambu "Awas Bahaya Listrik" Standart 2 Temporary Panel , Inspection Panel, Pengecekan Power tools s PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik Prosedur dan Instruksi Kerja yang telah disusun. 1

STRUKTUR KONSTRUKSI ATAS ( UPPER STUCTURE ) Rutin Terkena benda tajam / ujung besi

Pemasangan /

Luka

3

3

9

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan

M

Permenker No. Per.01/MEN/19 80 ttg Keselamatan dan Kesehatan Kerja pada

2

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

1

Activities / Area

Pemasangan / Jacking Climbing corewall

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

2

Terjatuh dari ketinggian

Luka, cidera, kematian

3

4

Terjepit antara corewall dan climbing

Luka, cidera

2

3

Per.01/MEN/19 80 ttg Keselamatan dan Kesehatan Kerja pada 12 H Tempat Kegiatan Konstruksi; Permenaker No. 6 M 08/MEN/2010

Climbing terjatuh setelah dipasang Luka, cidera

3

3

9

M

Tertimpa material / climbing

3

3

9

M

9

Permenker No. Pemasangan Rambu "Hand Gloves dan Training Hand Per.01/MEN/19 Safety 80 ttg PPE : Pakai sarung tangan Keselamatan dan Kesehatan Kerja pada M Tempat Kegiatan Konstruksi; Permenaker No. 08/MEN/2010

Luka, cidera

6

M Permenker No.

R

Responsibility

1

2

L

Safety & FASO

2

4

L

Safety & Supervisor

2

2

L

Safety & Supervisor

1

2

2

L

1

2

2

L

2

1

2

L

L

ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Hand Gloves dan Training Hand 2 Safety PPE : Pakai sarung tangan dan sepatu boot s ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / 2 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training 1 Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan

Terkena alat kerja manual (terpukul palu, terjepit gegep, tang Luka, cidera dan kunci)

3

S

Color

Operation/Task Location/Area

Pin climbing tidak boleh dengan besi Barikade area dibawah jacking climbing

Safety & Supervisor Safety & Supervisor

ADM : General Work Permit sesuai Prosedur ,

2

Pembongkaran Terkena benda tajam / ujung besi climbing corewall

Luka

3

3

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

3

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

Terkena alat kerja manual (terpukul palu, terjepit gegep, tang Luka, cidera dan kunci)

3

Terjatuh dari ketinggian

Luka, cidera

3

3

9

Tersandung patok stud scaffolding Luka, cidera

3

3

9

Tertimpa material / climbing

Luka, cidera

3

3

9

Sling putus Fabrikasi Bekisting, scaffolding dan pembesian jatuh menimpa pekerja

Luka, cidera, meninggal

4

3 12 H

Material jatuh saat diangkat dan Pengangkatan dan mengenai pekerja unloading material besi, scaffolding Tangan pekerja terjepit saat dan bekisting pengangkatan dan saat unloading

Luka, cidera, meninggal

4

3

Luka, cidera

2

3

Terkena material akibat manuver TC

Luka, cidera, meninggal

4

3

3

9

LEGAL REFERENCE

M Permenker No. Per.01/MEN/19 80 ttg Keselamatan dan Kesehatan Kerja pada M Tempat Kegiatan Konstruksi; Permenaker M No. 08/MEN/2010

M

Permenaker No. 01/MEN/1980 ttg 12 H Keselamatan dan Kesehatan Kerja pada Konstruksi 6 M Bangunan; Permenaker No. 12 H 08/MEN/2010

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves 9 dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Patok stud di cat hingga jelas terlihat Barikade area dibawah jacking climbing

L

S

R

Color

Operation/Task Location/Area

Responsibility

2

1

2

L

Safety & FASO

2

1

2

L

Safety & Supervisor

2

1

2

L

2

1

2

L

2

2

4

L

Safety

2

2

4

L

Safety

Safety & Supervisor Safety & Supervisor

Inspeksi rutin (Adm control)

Penggunaan safety helmet & safet shoes (Adm control) ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Safety & 1 2 2 L Hand Safety , Penempatan Rigger/ Signalman Supervisor PPE : Pakai Helmet, Sarung tangan Prosedur dan Instruksi Kerja tentang Crane, lifting & rigging (Adm control) Safety & 2 2 4 L Supervisor ADM : General Work Permit sesuai Prosedur,

Tangan atau kaki terjepit rangkaian Luka, cidera besi

2

3

6

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training M No. Hand Safety , Penempatan Rigger/ Signalman 01/MEN/1980 PPE : Pakai Helmet, Sarung tangan ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan; Permenaker

2

1

2

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Risk Assessment No. Method Statement Before

Item

Activities / Area

Hazard Risk Identified Tangan tertusuk kawat bendrat

Luka

Rekan kerja terkena manuver besi yang diangkat/ dipindahkan secara Luka, cidera manual

4

L

S

R

2

3

6

3

3

9

Pemasangan rangkaian besi Tersandung/ tersangkut stek besi

Luka, cidera

3

3

Terkena / terjepit gegep

Luka, cidera

2

3

Terperosok kedalam lubang pembesian

Luka, cidera

3

3

Kebakaran saat pengelasan embeded

Luka, cidera, kebakaran, kematian

4

3

9

Permenaker LEGAL No. REFERENCE 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan; M Permenaker No. 08/MEN/2010

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Training Operator, Pakai sarung Tangan Kulit (adm control & PPE) 2 1 2

L

Safety & Supervisor

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" sdan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet

Pemberlakuan Pemberian tanda pada stek (Adm control) SNI No. SNI-040225-2000 M mengenai PUIL 2000 di tempat kerja

Permenaker 6 M No. 1/MEN/1980 ttg 9 M Keselamatan dan Kesehatan Kerja pada Kontruksi 12 H Bangunan

Responsibility

R

Color

General Project Activities Project Site

Color

Operation/Task Location/Area

ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Tutup lubang dengan papan dan diberi rambu ADM : General Permit sesuai Prosedur , Penanganan Material B3 , training MSDS dan menempatkan MSDS pada lokasi kerja dan workshop PPE : Pakai Sarung tangan dan google

L

S

1

2

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terjepit asesories scaffolding saat pemasangan

Terpukul asesories scaffold saat pemasangan

Terjatuh dari ketinggian

5

Pemasangan Slab form and beam formwork

Luka, cidera

Luka, cidera

Luka, cidera

L

2

2

2

S

4

3

3

LEGAL REFERENCE

R

Color

Before

Item

8

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

6

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

6

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

S

Responsibility

R

Color

Operation/Task Location/Area

2

L

Safety & Supervisor

Prosedur dan Instruksi Kerja tentang Pemasangan Scaffolding

1

2

Prosedur dan Instruksi Kerja tentang Pemasangan Scaffolding

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT

Pemasangan Slab Activities form and /beam Area formwork

Risk Assessment No. Method Statement Before

Hazard Risk Identified

L

S

R

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Jatuh karena tertabrak material yang terbang

Luka, cidera

3

2

6

Tertimpa asesoris scaffold / material lain

Luka, cidera

2

3

6

M

Terjepit kunci scaffolding

Luka, cidera

6

Permenaker ADM : General Work Permit sesuai Prosedur , No. Pemasangan Rambu "Awas Terjepit " dan Training M 08/MEN/2010

Mata Terkena sisa besi rebar yang Luka, cidera di taruh diatas scaffolding

Tersandung/ tersangkut stek besi

Luka, cidera

3

2

3

3

3

S

R

Responsibility

Rapatkan atau paku semua material yang berpotensi terbang karena angin besar

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

2

L

Color

Item 5

General Project Activities Project Site

Color

Operation/Task Location/Area

Penempatan safety net (engineering control),

Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Penempatan material yang rapi

9

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

6

Pemberlakuan Pemberian tanda pada stek (Adm control) SNI No. SNI-040225-2000 M mengenai PUIL 2000 di tempat kerja

2

1

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified Tertabrak PC Slab saat diangkat TC Luka, cidera

6

7

L

S

R

Color

Before

Item

2

3

6

M

Terjepit PC Slab saat setting

Luka, cidera

3

3

9

Pemasangan half PC slab Terjatuh di lubang/opening

Luka, cidera

3

3

9

Pemasangan bekisting kolom

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi M Bangunan

Terjatuh dari ketinggian

Luka, cidera, kematian

4

3 12 H

Terkena manuver TC membawa material bekisting kolom

Luka, cidera, meninggal

4

3 12 H

Sling putus saat membawa material bekisting kolom

Luka, cidera, meninggal

4

3 12 H

Bagian bekisting terlepas dan jatuh Luka, cidera, menimpa orang meninggal

4

3 12 H

Terjepit bekisting kolom saat pemasangan

Luka, cidera

3

3

9

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure Prosedur dan Instruksi Kerja tentangTower Crane. ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Prosedur dan Instruksi Kerja tentang Proteksi Bahaya

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. 08/MEN/2010 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Awas Manuver Alat Berat" dan No. 09/MEN/ Training dan Pemasangan Proteksi, Prestart 2010 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Lokalisisir manuver alat berat (adm control)

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Responsibility

L

S

R

Color

Operation/Task Location/Area

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Safety & Supervisor Prosedur dan Instruksi Kerja tentang Loading dan Unloading (Adm control) Safety & 2 2 4 L Supervisor ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan

2

2

4

L

2

1

2

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Permenaker Risk Assessment No. No. Method Statement

Item

8

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Terjatuh dari ketinggian

Luka, cidera, meninggal

4

3 12 H

Terjepit asesories scaffolding saat pemasangan

Luka, cidera

3

3

9

Terpukul asesories scaffold saat pemasangan

Luka, cidera

3

3

9

Pemasangan Scaffolding kerja

01/MEN/1980 ttg LEGAL Control Measure Keselamatan REFERENCE dan Kesehatan Kerja pada ENG : Pasang life line Konstruksi ADM : Work at Height Permit sesuai Prosedur, Bangunan Pemasangan Rambu "Gunakan Safety Body Harness /

Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training M Permenaker Hand Safety , Penempatan Rigger/ Signalman No. PPE : Pakai Helmet, Sarung tangan 01/MEN/1980 Prosedur dan Instruksi Kerja yang telah disusun. ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi M Bangunan

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Penempatan safety net (engineering control),

Terjatuh dari ketinggian

Luka, cidera

3

3

9

Tertimpa asesoris scaffold / material lain

Luka, cidera

3

3

9

M

9

Permenaker Pemasangan Rambu "Awas Terjepit "dan Training No. M Hand Safety , Penempatan Rigger/ Signalman 08/MEN/2010

Permenaker No. 08/MEN/2010

BBS/HSE/General-01 RESIDUAL RISK

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

ADM : General Work Permit sesuai Prosedur,

Terjepit kunci scaffolding

Terjepit pipa 9

Setting concrette pipe

Luka, cidera

Luka

3

2

3

3

6

PPE : Pakai Helmet, Sarung tangan ADM : General Work Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. M 01/MEN/1980 Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Risk Assessment No. Permenaker Method Statement Before

Item 9

Activities / Area Setting concrette pipe

Hazard Risk Identified

Kaki tertimpa pipa saat menyambung

10

Cidera

L

S

R

2

3

6

No. RESIDUAL RISK 01/MEN/1980 LEGAL Control Measure ttg REFERENCE L S R Keselamatan dan Kesehatan Prosedur Kerja dan Instruksi Kerja in project (Adm control) Kerja pada M 2 1 2 L Konstruksi Bangunan

Terkena Manuver Mixer Beton

Kematian

4

3 12 H

Keluar masuk mixer beton menabrak kendaraan umum dan pribadi

Luka, cidera, meninggal

4

3 12 H

3

3

Pengecoran Beton Sakit kolom, dinding dan Bising dari Mixer Beton, Concrette pendengaran, Pump dan Compressor slab tuli

9

BBS/HSE/General-01 -

M

Color

General Project Activities Project Site

Color

Operation/Task Location/Area

Permenaker No. 01/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Responsibility

Safety

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Manuver Alat Berat" dan 2 2 4 L Safety Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Flagman / security standby saat keluar masuk dan penempatan rambu (Adm control) 2 2 4 L Safety

Permenaker Penggunaan Ear Plug (Adm control) No. 08/MEN/2010

2

1

2

L

Safety & Supervisor

4

L

Safety & Supervisor

4

L

Safety

Prosedur Kerja dan Instruksi Kerja in project (Adm control)

Mata dan kulit terciprat air beton saat pengecoran

Iritasi mata dan kulit

3

3

9

Mata terciprat air beton saat meratakan beton dari Concrete pipe saat mengecor plat

Iritasi mata dan kulit

3

3

9

Permenaker No. M 2 2 01/MEN/1980 ttg Keselamatan dan Kesehatan Prosedur Kerja dan Instruksi Kerja in project (Adm control) Kerja pada M 2 2 Konstruksi Bangunan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

Terjatuh dari bucket saat mengecor kolom

Luka, cidera, meninggal

4

Terjatuh dari scaffolding saat mengecor kolom

Luka, cidera, meninggal

4

Terjatuh dari atas scaffolding akibat hembusan angin kencang

Luka, cidera, meninggal

4

Terkena cangkul saat meratakan beton

Luka

2

Terpapar getaran dari vibrator

Gangguan motorik

3

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H 2 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness. Permenaker ENG : Pasang life line No. ADM : Work at Height Permit sesuai Prosedur 01/MEN/1980 Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H 2 ttg Body Harness" dan Training Penggunaan APD, Keselamatan Bekerja di ketinggian, Pemasangan Scaffolding s dan Kesehatan PPE : Pakai Helm + tali dagu dan Safety Body Harness Kerja pada ENG : Pasang life line Konstruksi ADM : Work at Height Permit sesuai Prosedur , Bangunan Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H 2 Body Harness" dan Training Penggunaan APD,Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Prosedur Kerja dan Instruksi Kerja in project (Adm control) 3 6 M 2

3

9

Kepmenaker & Trans No. Kep. : 51/MEN/2011 M ttg NAB Faktor Fisika di Tempat Kerja

Responsibility

S

R

Color

Operation/Task Location/Area

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

1

2

L

Safety & Supervisor

2

4

L

Safety & FASO

Pengaturan jam kerja (Adm control)

2

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Tersengat listrik akibat kabel yang digunakan untuk distribusi daya ke Luka, cidera, vibrator atau kabel vibrator luka meninggal akibat terinjak / tertimpa material berat dan tajam

Luka, Cidera, Kolom jebol dan concrete terjatuh kematian kebawah kerusakan properti

Terkena cipratan beton saat pengecoran kolom

Iritasi mata dan kulit

L

4

4

2

Color

Before

Item

LEGAL REFERENCE

S

R

3

Kepmenaker & Trans No. Kep 75./MEN/ 2002 ttg Pemberlakuan 12 H SNI No. SNI-040225-2000 mengenai PUIL 2000 di tempat kerja

4 16 H

3

6

Permenaker no 1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" Standart Temporary Panel , Inspection Panel, Pengecekan Power tools 2 PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik

Responsibility

S

R

Color

Operation/Task Location/Area

2

4

L

Safety & Supervisor

2

4

L

Safety & Construction

3

3

L

Safety & Supervisor

Tambahkan perkuatan pada hollow bekisting dengan plat besi

2

Prosedur Kerja dan Instruksi Kerja in project (Adm control)

1

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

11

Activities / Area

Hazard Risk Identified

S

R

Terjepit asesories scaffolding saat pemasangan

Luka, cidera

3

3

9

Terpukul asesories scaffold saat pemasangan

Luka, cidera

3

3

9

Pembongkaran Formwork dan Terjatuh dari ketinggian Scaffolding struktur

3

4 12 H

Tertimpa asesoris scaffold / material lain

Luka, cidera

3

3

Terjepit kunci scaffolding

Luka, cidera

ARSITEKTUR DAN FINISHING

Luka, cidera

3

3

3

3

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Penempatan safety net (engineering control),

9

M

9

Permenaker ADM : General Work Permit sesuai Prosedur No. Pemasangan Rambu "Awas Terjepit " dan Training M 08/MEN/2010

9

L

S

ADM : General Work Permit sesuai Prosedur Pemasangan Rambu "Awas Terjepit " dan Training M 1 2 Permenaker Hand Safety , Penempatan Rigger/ Signalman No. PPE : Pakai Helmet, Sarung tangan 01/MEN/1980 Prosedur Kerja dan Instruksi Kerja in project (Adm control) M 1 1 ttg

Luka, cidera, kematian

Bagian bekisting terlepas dari lantai atas dan jatuh menimpa orang

Rutin

L

Color

Before

Item

BBS/HSE/General-01 -

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Penempatan safety net (engineering control),

Responsibility

R

Color

Operation/Task Location/Area

6

L

Safety & Supervisor

3

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

1

2

Activities / Area

Aktivitas pemasangan PC Façade

Pemasangan Alumunium Window

Hazard Risk Identified

L

S

R

Color

Before

Item

PC Standing terjatuh

Luka, Cidera, meninggal

4

3 12 H

Sling putus saat angkat PC Wall dan jatuh menimpa pekerja

Luka, cidera, meninggal

4

3 12 H

Material jatuh saat diangkat dan mengenai pekerja

Luka, cidera, meninggal

4

3

LEGAL REFERENCE

Permenaker no 12 H 1/MEN/1980 ttg Keselamatan 9 M dan Kesehatan Kerja pada Konstruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Lokalisir manuver alat berat (eng control)

Luka, cidera

3

3

Terkena material akibat manuver TC

Luka, cidera, meninggal

4

3 12 H

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Prosedur dan Instruksi Kerja tentang Crane, lifting & rigging (Adm control)

Chain block terjatuh saat setting PC Luka, cidera, Façade meninggal

4

3 12 H

Kaitkan kedua hook chain block sebelum chain block didekatkan ke PC Façade

Luka, cidera

Kebakaran saat pengelasan frame

Luka, cidera, kebakaran, kematian

2

4

3

6

S

R

Responsibility

Memastikan sudut penempatan 1,65derajat, perkuatan PC Standing denganSafety UNP,&dan pastikan urutan p 2 2 4 L Supervisor Lokalisir manuver alat berat (eng control) 2 2 4 L

Tangan pekerja terjepit saat pengangkatan dan saat unloading

Tangan terjepit material / frame window

L

Color

Operation/Task Location/Area

ADM : General Work Permit sesuai Prosedur , Per.05/MEN/19 Pemasangan Rambu "Awas Terjepit " dan Training M 85 Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan

ADM : General Permit sesuai Prosedur , Penanganan Material B3 Hazardous Material, training MSDS dan Per.05/MEN/19 3 12 H menempatkan MSDS pada lokasi kerja dan workshop 85 PPE : Pakai Sarung tangan dan google

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

R

Color

Before

Item

BBS/HSE/General-01 -

9

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. Hand Safety , Penempatan Rigger/ Signalman 01/MEN/1980 PPE : Pakai Helmet, Sarung tangan ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

ADM : General Work Permit sesuai Prosedur ,

3

Pemasangan Scaffolding

Tangan pekerja terjepit saat pengangkatan dan saat unloading

Luka, cidera

3

3

Wire rope customized jib putus saat lifting

Luka, cidera, meninggal

4

3 12 H

Terpukul scaffolding saat transport Luka, cidera dan pemasangan material

3

3

Prosedur dan Instruksi Kerja tentang Crane, lifting &

9

Per.05/MEN/19 rigging (Adm control) 85

Prosedur Kerja dan Instruksi Kerja in project (Adm control)

M

Terjatuh dari lantai atas akibat hembusan angin kencang

Luka, cidera, meninggal

4

3 12 H

Terjatuh dari ketinggian

Kematian

4

3 12 H

Permenaker No. 01/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur, Pemasangan Rambu "Gunakan Safety Body Harness / 2 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding s PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur Pemasangan Rambu "Gunakan Safety Body Harness / 2 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

4

Activities / Area

Penggunaan Molen untuk mengaduk semen

Hazard Risk Identified

Terpapar debu semen saat memasukan semen ke molen

Mata dan kulit terkena semen

Pemasangan Celcon Dinding, plaster dan aci

Iritasi mata dan kulit

Sakit pendengaran, tuli

Bising

5

Sakit pernafasan

L

3

3

3

S

3

3

3

R

9

9

9

Color

Before

Item

Permenaker No. M 01/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada M Konstruksi Bangunan Kepmenaker & Trans No. Kep. : 51/MEN/2011 M ttg NAB Faktor Fisika di Tempat Kerja

Luka, cidera

2

3

6

Terkena putaran molen

Luka, cidera

3

3

9

2

3

6

M

2

3

6

M

Terkena Mortar

RESIDUAL RISK

Control Measure ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Masker" dan Training Penggunaan APD dan Penggunaan Respirator PPE : Pakai Masker / Respirator

Permenaker No. 08/MEN/2010

Responsibility

L

S

R

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety

2

2

4

L

Safety & Supervisor

4

L

Safety & Supervisor

2

L

Safety & Supervisor

Prosedur Kerja dan Instruksi Kerja in project (Adm control)

Penggunaan air muff atau air plug (PPE)

Permenaker Prosedur Kerja dan Instruksi Kerja in project (Adm control) No. M 01/MEN/1980 2 2 ttg Keselamatan Prosedur Kerja dan Instruksi Kerja in project (Adm control) dan Kesehatan Kerja pada M 1 2 Konstruksi Bangunan

Terpukul engkol saat menghidupkan molen

Gangguan pernafasan Sakit pada mata

LEGAL REFERENCE

BBS/HSE/General-01 Color

Operation/Task Location/Area

Menggunakan APD

1

2

2

L

1

2

2

L

Safety & Supervisor Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT

Before

Pemasangan Celcon Item Activities / Area 5 Dinding, plaster dan aci

Hazard Risk Identified Terkena Mortar iritasi pada kulit

Tersengat listrik

6

Risk Assessment No. Method Statement

Penggunaan Gerinda untuk Bising pemotongan marmer / keramik

Terkena mata gerinda

L

S

R

2

3

6

M

LEGAL Permenaker REFERENCE No. 08/MEN/2010

Luka, cidera, kematian

4

3

Kepmenaker & Trans No. Kep 75./MEN/ 2002 ttg Pemberlakuan 12 H SNI No. SNI-040225-2000 mengenai PUIL 2000 di tempat kerja

Sakit pendengaran, tuli

3

3

9

M

9

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Luka, cidera cacad

3

3

BBS/HSE/General-01 RESIDUAL RISK

Control Measure Menggunakan APD

S

R

1

2

2

L

Safety & Supervisor

2

4

L

Safety & Supervisor

2

4

L

Safety & Supervisor

1

2

L

Safety & Supervisor

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit Pemasangan Rambu "Awas Bahaya Listrik" dan Standart Temporary Panel , Inspection Panel, Pengecekan Power tools. PPE : Pakai Sarung tangan, safety shoes dan helm anti 2 listrik

Kepmenaker Penggunaan air muff atau air plug (PPE) No. Kep. 51/MEN/1999

Responsibility

L

Color

General Project Activities Project Site

Color

Operation/Task Location/Area

2

Prosedur Kerja dan Instruksi Kerja in project (Adm control)

2

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Tersengat listrik kabel distribusi ke Pingsan, Trafo Las Kematian

L

4

Color

Before

Item

LEGAL REFERENCE

S

R

3

Kepmenaker & Trans No. Kep 75./MEN/ 2002 ttg Pemberlakuan 12 H SNI No. SNI-040225-2000 mengenai PUIL 2000 di tempat kerja

3

PP No. 11 tahun 1975 ttg M Keselamatan Kerja terhadap Radiasi

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit , Pemasangan Rambu "Awas Bahaya Listrik" dan Standart Temporary Panel , Inspection Panel, Pengecekan Power tools PPE : Pakai Sarung tangan, safety shoes dan helm anti 2 listrik

S

R

Color

Operation/Task Location/Area

2

4

L

ENG : Pasang Baricade area pengelasan

7

Pengelasan

Terpapar radiasi las

Sakit mata

3

9

Tabung gas meledak

Kebakaran, kematian

4

3 12 H

Terkena bunga api

Luka

3

3

9

M

Permenaker No. 1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Kontruksi Bangunan

Safety & Supervisor

ADM : Hot Work Permit sesuai Prose

2

ENG : Pasang Baricade area kerja

ENG : Pasang Baricade area pengelasan

Responsibility

2

4

L

Safety & Supervisor

ADM : Hot Work Permit sesuai Prosedur, Pe

L

Safety & Supervisor

2

2

4

2

2

Safety ADM : Hot Work& Permit sesuai Prose 4 L Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

8

Activities / Area

Akses turun naik tangga

Hazard Risk Identified

Terjatuh dari tangga

Luka, cedera

L

3

S

3

LEGAL REFERENCE

R

Color

Before

Item

9

Permenaker No. 1/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Kontruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

L

S

R

Color

Operation/Task Location/Area

2

1

2

L

Responsibility

Safety Supervisor

Inspeksi rutin (Adm control)

9

10

Papan terjatuh

Luka cedera

3

3

9

Tergores alat kerja

Luka cedera

3

3

9

3

Kepmenaker & Procedur. Work Permit Trans No. Kep 75./MEN/ 2002 ttg Pemberlakuan 12 H SNI No. SNI-040225-2000 mengenai PUIL 2000 di tempat kerja

Penempatan papan proteksi aluminium window

Trial electrical power

MEKANIKAL ELEKTRIKAL

Permenaker Safety No. M 2 1 2 L Supervisor 1/MEN/1980 ttg Keselamatan Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm control) dan Kesehatan Kerja pada Safety M 2 1 2 L Kontruksi Supervisor Bangunan

Hubungan pendek

Kebakaran, luka & cedera, kematian

4

2

2

4

L

Safety Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

S

R

Color

Operation/Task Location/Area

1

2

L

Safety Supervisor

2

4

L

Safety Supervisor

1

2

L

2

2

4

L

2

1

2

L

2

2

4

L

Safety Supervisor

1

2

2

L

Safety Supervisor

2

1

2

L

Safety Supervisor

L

Rutin

Luka, cedera

3

Cedera, kematian

4

Bising

Luka

3

ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Terjepit " dan Training 3 9 M 2 Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Permenaker ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , No. 1/MEN/1980 Pemasangan Rambu "Awas Bahaya Listrik" dan ttg Standart Temporary Panel , Inspection Panel, 3 12 H 2 Keselamatan Pengecekan Power tools dan Kesehatan PPE : Pakai Sarung tangan, safety shoes dan helm anti Kerja pada listrik Kontruksi Atur jam kerja dan gunakan earplug Bangunan 3 9 M 2

Kebakaran

Luka, cedera, kematian

4

3 12 H

Getaran

Luka

3

3

Anggota tubuh terjepit material

1

Fabrikasi material Tersengat listrik di workshop

Tangan terjepit besi

2

Pemasangan sleeve dibawah 1,8 mtr Tersayat / tertusuk material

Tersandung saat berjalan

9

Luka, cedera

3

3

9

Luka, cedera

3

3

9

Luka, cedera

3

3

9

M Permenaker M No. 1/MEN/1980 ttg Keselamatan M dan Kesehatan Kerja pada Kontruksi M Bangunan

Proteksi bunga api dan sediakan APAR Atur jam kerja dan gunakan glove ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Housekeeping

Berjalan pada papan akses jalan

Safety Supervisor Safety Supervisor Safety Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

BBS/HSE/General-01 RESIDUAL RISK

LEGAL REFERENCE

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety Supervisor

1

2

2

L

Safety Supervisor

2

1

2

L

2

4

L

Safety Supervisor

2

1

2

L

Safety Supervisor

2

1

2

L

Safety Supervisor

Hati-hati saat pemasangan dan pakai APD

3

Tangan terjepit besi

Luka, cedera

3

3

9

Tersayat / tertusuk material

Luka, cedera

3

3

9

Tersandung saat berjalan

Luka, cedera

3

3

9

Pemasangan sleeve diatas 1,8 mtr

Terjatuh dari ketinggian

4

Luka, cedera, kematian

4

Permenaker No. M 1/MEN/1980 ttg Keselamatan Housekeeping dan Kesehatan Kerja pada M Kontruksi Bangunan

M

3 12 H

Bising

Luka

3

3

9

Getaran

Luka

3

3

9

Pemasangan anchor bolt

Permenaker No. 1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Kontruksi Bangunan

Berjalan pada papan akses jalan

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur, Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja 2 di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

Permenaker Atur jam kerja dan gunakan earplug No. M 1/MEN/1980 ttg Keselamatan Atur jam kerja dan gunakan glove dan Kesehatan Kerja pada M Kontruksi Bangunan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

5

6

7

Activities / Area

Hazard Risk Identified

Anggota tubuh terjepit material

Luka, cedera

3

Material terjatuh

Luka, cedera, kematian

4

Terjatuh dari ketinggian

Luka, cedera, kematian

4

Kebakaran

Luka, cedera, kematian

4

Pengangkatan pipa

Pengelasan pipa

L

Penggerindaan pipa Bising

Luka

3

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

R

1

2

L

Safety Supervisor

2

4

L

Safety Supervisor

2

4

L

Safety Supervisor

2

2

4

L

Safety Supervisor

2

1

2

L

Safety Supervisor

2

2

4

L

Safety Supervisor

2

2

4

L

Safety Supervisor

L

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training 3 9 M 2 Hand Safety , Penempatan Rigger/ Signalman Permenaker PPE : Pakai Helmet, Sarung tangan No. Gunakan teknik sesuai Prosedur dan Instruksi Kerja 3 12 H 1/MEN/1980 2 yang telah tersusun. ttg ENG : Pasang life line Keselamatan ADM : Work at Height Permit sesuai Prosedur , dan Kesehatan Pemasangan Rambu "Gunakan Safety Body Harness / Kerja pada 3 12 H Body Harness" dan Training Penggunaan APD, Bekerja 2 Kontruksi di ketinggian, Pemasangan Scaffolding Bangunan PPE : Pakai Helm + tali dagu dan Safety Body Harness Proteksi bunga api dan sediakan APAR

3 12 H

3

9

Kepmenaker & Trans No. Kep. : 51/MEN/2011 M ttg NAB Faktor Fisika di Tempat Kerja

Responsibility

S

Color

Operation/Task Location/Area

Atur jam kerja dan gunakan earplug

Gunakan cover gerinda dan APD

Luka terkena mata gerinda

Luka, cedera, kematian

4

3 12 H

Kebakaran

Luka, cedera, kematian

4

3 12 H

Permenaker No. 1/MEN/1980 ttg Keselamatan Proteksi bunga api dan sediakan APAR dan Kesehatan Kerja pada Kontruksi Bangunan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety Supervisor

2

2

4

L

Safety Supervisor

2

2

4

L

Safety Supervisor

2

1

2

L

Safety Supervisor

2

1

2

L

Safety Supervisor

2

2

4

L

Safety Supervisor

Tidak menggunakan botol AMDK

8

Cairan thinner teriminum

Keracunan, kematian

4

3 12 H

Kebakaran

Luka, cedera, kematian

4

3 12 H

Pengecatan pipa

9

Bekerja diatas ceilling

10

Pengetesan Hydrant

Terjatuh dari ketinggian

Luka, cedera, kematian

4

3

Selang hydrant tak terkendali

Luka, cedera

3

3

Anggota tubuh terjepit material

11

Pemasangan cable Material terjatuh tray / cable rack

Permenaker No. 1/MEN/1980 ttg Keselamatan Jauhkan thinner dari sumber panas / api dan Kesehatan Kerja pada Kontruksi Bangunan

Permenaker No. 1/MEN/1980 12 H ttg Keselamatan dan Kesehatan Kerja pada Kontruksi Bangunan 9 M

Luka, cedera

3

3

9

M

Luka, cedera, kematian

4

3 12 H

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

Selang dipegang minimal 4 orang dengan posisi yang tepat

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Permenaker Hand Safety , Penempatan Rigger/ Signalman , No. Prosedur Crane, lifting & rigging 1/MEN/1980 PPE : Pakai Helmet, Sarung tangan ttg Gunakan teknik sesuai Prosedur dan Instruksi Kerja Keselamatan yang telah tersusun. dan Kesehatan Kerja pada Kontruksi Bangunan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Operation/Task Location/Area

General Project Activities Project Site

Risk Assessment No. Permenaker MethodNo. Statement

Penarikan kabel

13 Penyambungan Daya dan Pengetesan

Terjatuh dari ketinggian

Luka, cedera, kematian

4

Keletihan

Luka

R

2 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding s PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H 2 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding s PPE : Pakai Helm + tali dagu dan Safety Body Harness Kepmenaker & Jumlah personil penarik kabel sesuai dengan total Trans No. Kep panjang kabel yang ditarik, dipimpin oleh 1 komando

2

4

L

Safety Supervisor

2

4

L

Safety Supervisor

2

2

L

Safety Supervisor

2

4

L

Safety Supervisor

2

4

L

Safety Supervisor

3 12 H

4

3

Responsibility

S

S

Luka, cedera, kematian

RESIDUAL RISK

L

L

Terjatuh dari ketinggian

1/MEN/1980 LEGAL Control Measure ttg REFERENCE Keselamatan dan Kesehatan ENG : Pasang life line Kerja pada ADM : Work at Height Permit sesuai Prosedur, Kontruksi Pemasangan Rambu "Gunakan Safety Body Harness / Bangunan

Color

12

Hazard Risk Identified

3

R

Color

Before

Item Activities / Area Pemasangan cable 11 tray / cable rack

BBS/HSE/General-01 -

9

75./MEN/ 2002 ttg Pemberlakuan M SNI No. SNI-040225-2000 mengenai PUIL 2000 di tempat kerja

Tersengat listrik

Luka, cedera, kematian

4

3 12 H

Panel meledak / terbakar

Luka, cedera, kematian

4

3 12 H

1

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" dan 2 Standart Temporary Panel , Inspection Panel, Pengecekan Power tools PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik Cek kebutuhan daya dan kemampuan distribusi daya dari panel serta siapkan 1 orang teknisi listrik di tiap 2 panel

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area Penyambungan Daya dan Pengetesan

Hazard Risk Identified

Tersengat listrik

Luka, cedera, kematian

L

4

S

R

Color

Before

Item

LEGAL REFERENCE

3 12 H

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" dan 2 Standart Temporary Panel , Inspection Panel, Pengecekan Power tools PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik

2

4

L

Safety Supervisor

2

2

4

L

Safety Supervisor

2

2

4

L

Logistik

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

LANDSCAPING Rutin

1

Terkena manuver Excavator

Luka, cidera, Meninggal

4

3 12 H

Alat berat terguling karena area galian longsor / amblas

Luka, cidera, Meninggal

4

3 12 H

Kematian karena setrum, 4 kerusakan aset

3 12 H

Luka, cidera, Meninggal

4

3 12 H

Pekerja terperosok lubang area galian karena gelap saat malam Luka, cidera, atau karena tidak ada railling area Meninggal galian

4

3 12 H

Pengalian dengan Mengenai instalasi existing (Kabel Listrik, telepon, gas Excavator Area galian longsor, alat terguling menimpa pekerja

Permenaker No. 09/MEN/2010 ttg Pesawat Tenaga dan Produksi

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Operator memilik SIO ( adm control) Penyelidikan instalasi existing sebelum penggalian atau dilakukan screening pada area tertentu (Adm control)

Permenaker No. 1/MEN/1980 Perkuatan lahan/ retaining wall (engineering control) ttg Keselamatan dan Kesehatan Pasang penerangan dan rambu (Adm contro) Kerja pada Kontruksi Bangunan

Operation/Task Location/Area Item

Activities / Area

General Project Activities Project Site Hazard Risk Identified Area galian longsor, pekerja tertimbun

Luka, cidera, Meninggal

Risk Assessment BBS/HSE/General-01 RESIDUAL RISK

Control Measure

S

R

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Logistik

2

1

2

L

Safety

2

1

2

L

Safety & Supervisor

2

1

2

L

2

1

2

L

2

1

2

L

2

1

2

L

Perkuatan lahan/ retaining wall (engineering control) 4

3 12 H

Responsibility

L

Color

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR INDONESIA MEDAN PROJECT

Permenaker No. MILLS 1/MEN/1980 ttg Keselamatan Riskdan Assessment Kesehatan No. KerjaStatement pada Method Kontruksi Before LEGAL Bangunan REFERENCE L S R Color

Pengalian dengan

1 Buana sakti Berca Excavator

ADM : General Work Permit sesuai Prosedur ,

2

Pembuatan dan pemasangan Bekisting untuk saluran air

Terpapar debu semen

Sakit pernafasan

3

3

9

Permenaker Pemasangan Rambu "Gunakan Masker" dan Training No. M Penggunaan APD dan Penggunaan Respirator 08/MEN/2010 PPE : Pakai Masker / Respirator

Mata dan kulit terkena semen

Luka, cidera

3

3

9

M

Terkena cangkul saat mengaduk semen manual

Luka, Cidera

3

3

9

Penempatan MSDS (Adm control)

Permenaker No. Sepatu kerja, sarung tangan dan helmet (PPE) M 01/MEN/1980

ADM : General Work Permit sesuai Prosedur,

3

Pembesian saluran Terkena alat kerja manual (gegep) Luka, cidera air

3

3

9

Permenaker Pemasangan Rambu "Hand Gloves dan Training Hand No. 01/MEN/1980 Safety PPE : Pakai sarung tangan dan sepatu boot ttg M Keselamatan dan Kesehatan Kerja pada Kosntruksi Bangunan

M

Tertusuk tajam kawat bendrat

Luka, cidera

3

3

9

Terkena tajam ujung besi

Luka, cidera

3

3

9

Terperosok kedalam lubang pembesian

Luka, cidera

3

3

9

Terjepit rangkaian besi

Luka, cidera

3

3

9

Permenaker No. M 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Kosntruksi M Bangunan

Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm control) Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm control) Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm control) ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan

Safety & Supervisor Safety & Supervisor Safety & Supervisor Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terkena Manuver Mixer Beton

4

Keluar masuk mixer beton menabrak kendaraan umum dan pribadi Pengecoran saluran Bising dari Mixer Beton, Concrette Pump dan Compressor

Kematian

Luka, cidera, meninggal Sakit pendengaran, tuli

L

S

R

Color

Before

Item

LEGAL REFERENCE

3

3

4

3

Permenaker No. 01/MEN/1980 9 M ttg Keselamatan dan Kesehatan Kerja pada Kosntruksi 12 H Bangunan

3

3

9

M

3

3

9

M

Mata dan kulit terciprat air beton saat Pencucian talang mixer

Iritasi mata dan kulit

Mata terciprat air beton saat meratakan beton dari Concrete pipe saat mengecor.

Iritasi mata dan kulit

3

3

9

Terkena cangkul saat meratakan beton

Luka

3

3

9

Permenaker No. 08/MEN/2010

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Kosntruksi M Bangunan

BBS/HSE/General-01 RESIDUAL RISK

L

S

R

Color

Operation/Task Location/Area

Control Measure

Responsibility

2

1

2

L

Safety

2

2

4

L

Safety

2

1

2

L

Safety & Supervisor

Prosedur dan Instruksi kerja yang telah tersusun untuk 2 Working in project (Adm control)

2

4

L

Safety & Supervisor

Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm control) 2

2

4

L

Safety & Supervisor

Prosedur dan Instruksi kerja yang telah tersusun untuk 2 Working in project (Adm control)

1

2

L

Safety & Supervisor

1

2

L

FASO

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Flagman / security standby saat keluar masuk dan penempatan rambu (Adm control) Penggunaan Ear Plug

Prosedur dan Instruksi kerja yang telah tersusun untuk

Terpapar getaran dari vibrator

Gangguan motorik

3

3

9

Kepmenaker & Working in project (Adm control) Trans No. Kep. : 51/MEN/2011 M ttg NAB Faktor Fisika di Tempat Kerja

2

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

R

3

Kepmenaker & Trans RI No. Kep75/MEN/2002 ttg 12 H Pemberlakuan SNI-04-02252000 mengenai PUIL 2000 di tempat kerja

3

3

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Sling putus saat angkat pohon dan Luka, cidera, jatuh menimpa pekerja meninggal

4

3 12 H

Material jatuh saat diangkat dan mengenai pekerja

4

3

Terkena cipratan beton saat pengecoran saluran

5

Pengangkatan dan Pemindahan Pohon

LEGAL REFERENCE

S

Tersengat listrik akibat kabel yang digunakan untuk distribusi daya ke Luka, cidera, vibrator atau kabel vibrator luka meninggal akibat terinjak / tertimpa material berat dan tajam

Iritasi mata dan kulit

Luka, cidera, meninggal

L

Color

Before

Item

4

9

Permenaker No. 12 H 01/MEN/1980 ttg Keselamatan dan Kesehatan 9 M Kerja pada Konstruksi Bangunan

Tangan pekerja terjepit saat pengangkatan dan saat unloading

Luka, cidera

3

3

Terkena material akibat manuver crane

Luka, cidera, meninggal

4

3 12 H

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" dan Standart Temporary Panel , Inspection Panel, Pengecekan Power tools sesuai Prosedur 2 PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik.

S

R

Color

Operation/Task Location/Area

Responsibility

2

4

L

Safety & ME

Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm control)

Inspeksi rutin (Adm control) Lokaisir manuver alat berat (Eng Control ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Prosedur dan Instruksi Kerja tentang Loading unloading (Adm control)

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

6

7

Activities / Area

Memasang dan menghubungkan kabel power ke Panel temporary

Hazard Risk Identified

Tersengat listrik

Luka, cidera, kematian

Penarikan kabel Pekerja kesetrum kabel lecet atau Cidera, distribusi untuk sambungan kabel tergenang air kematian daya penerangan

LIFT / ELEVATOR Pemasangan Terpukul scaffolding saat transport 1 scaffolding opening Luka, cidera dan pemasangan material lift

Terjatuh dari lantai atas akibat hembusan angin kencang

Luka, cidera, meninggal

L

Color

Before

Item

LEGAL REFERENCE

S

R

3

Kepmenaker & Trans RI No. Kep75/MEN/2002 ttg 12 H Pemberlakuan SNI No. SNI-040225-2000 ttg PUIL 2000 di tempat kerja

4

3

Kepmenaker & Trans RI No. Kep75/MEN/2002 ttg 12 H Pemberlakuan SNI No. SNI-040225-2000 ttg PUIL 2000 di tempat kerja

3

3

9

4

4

M

3 12 H

Permenaker No. 01/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik"dan Standart Temporary Panel , Inspection Panel, Pengecekan Power tools 2 PPE : Pakai Sarung tangan, safety shoes dan helm anti listrik

ENG : Pasang grounding kabel atau alat ADM : Electrical & LOTO Permit sesuai Prosedur , Pemasangan Rambu "Awas Bahaya Listrik" dan Standart Temporary Panel , Inspection Panel, Pengecekan Power tools PPE : Pakai Sarung tangan, safety shoes dan helm anti 2 listrik

S

R

Color

Operation/Task Location/Area

Responsibility

2

4

L

Safety & ME

2

4

L

Safety & ME

Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm control) Safety & 2 1 2 L Supervisor ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terjatuh dari ketinggian

2

3

Kematian

L

4

S

R

Color

Before

Item

3 12 H

Terkena alat kerja manual

Luka, Cidera

3

3

9

Tangan terkena alat potong

Luka, cidera

3

3

9

Pemasangan instalasi mekanikal

Ledakan panel akibat arus pandek

Luka, cidera, kematian

4

3

Tersengat listrik

Luka, cidera, kematian

4

3

Pemasangan instalasi electrical

LEGAL REFERENCE Permenaker No. 01/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Permenaker No. M 01/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada M Konstruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur, Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot ADM : General Work Permit sesuai Prosedur No. 13 Work Permit, Pemasangan Rambu "Hand Gloves sesuai WI. No. 29 dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot

Kepmenaker & Standard panel temporary Trans No. Kep 12 H 75./MEN/ 2002 ttg Pemberlakuan SNI No. SNI-04- Standard panel temporary 0225-2000 12 H mengenai PUIL 2000 di tempat kerja

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

4

Activities / Area

Hazard Risk Identified

Pembongkaran Terpukul scaffolding saat transport scaffolding opening Luka, cidera dan pemasangan material lift

L

2

Terjatuh dari lantai atas akibat hembusan angin kencang

Luka, cidera, meninggal

4

Terjatuh dari ketinggian

Kematian

4

S

4

LEGAL REFERENCE

R

Color

Before

Item

8

Permenaker No. 01/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

S

R

Color

Operation/Task Location/Area

Responsibility

Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm control)

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H No. Body Harness" dan Training Penggunaan APD, 01/MEN/1980 Bekerja di ketinggian, Pemasangan Scaffolding s ttg Keselamatan PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang life line dan Kesehatan ADM : Work at Height Permit sesuai Prosedur, Kerja pada Pemasangan Rambu "Gunakan Safety Body Harness / Konstruksi 3 12 H Body Harness" dan Training Penggunaan APD, Bangunan Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

SUMUR RESAPAN

1

Terkena swing Galian tanah dengan excavator

Terkena material

Cedera, luka

3

3

9

Cedera, luka

3

3

9

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur, Pemasangan Rambu "Awas Manuver Alat Berat" dan M Permenaker Training dan Pemasangan Proteksi, Prestart No. Inspection, Pengaturan akses alat berat, Penempatan 08/MEN/2010 Rigger/ Signalman PPE : Pakai Helmet Penggunaan safety gloves (APD) M

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

S

R

Color

Operation/Task Location/Area

Responsibility

RAISED FLOOR PAINT

1

Unloading material

Cedera, luka

3

3

9

M

Permenaker Penggunaan safety gloves (APD) No. 08/MEN/2010

2

2

4

L

Safety & Supervisor

Terkena manual hand tool

Cedera, luka

3

3

9

M

Permenaker Penggunaan safety gloves (APD) No. 08/MEN/2010

2

2

4

L

Safety & Supervisor

9

Kepmenaker & Trans No. Kep. : 51/MEN/2011 M ttg NAB Faktor Fisika di Tempat Kerja

2

1

2

L

Safety & Supervisor

9

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. M Hand Safety , Penempatan Rigger/ Signalman 08/MEN/2010

2

1

2

L

Safety & Supervisor

Pengecatan lantai Kondisi ruang kerja yang pengap (oilbase) karena kurangnya sirkulasi udara

Gangguan pernafasan / sesak napas

3

3

Penempatan blower (adm control)

ADM : General Work Permit sesuai Prosedur,

Terjepit material raised floor

Cedera, luka

3

3

PPE : Pakai Helmet, Sarung tangan

RAISED FLOOR WORK

1

Pekerjaan raised floor

Unloading material

Cedera, luka

3

3

9

M

Permenaker Penggunaan safety gloves (APD) No. 08/MEN/2010

2

2

4

L

Safety & Supervisor

Terkena manual hand tool

Cedera, luka

3

3

9

M

Permenaker Penggunaan safety gloves (APD) No. 08/MEN/2010

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

1

Activities / Area

Pekerjaan raised floor

Hazard Risk Identified

Kondisi ruang kerja yang pengap karena kurangnya sirkulasi udara

Gangguan pernafasan / sesak napas

L

3

S

3

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

R

Color

Before

Item

BBS/HSE/General-01 -

9

Kepmenaker & Trans No. Kep. : 51/MEN/2011 M ttg NAB Faktor Fisika di Tempat Kerja

9

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training No. M Hand Safety , Penempatan Rigger/ Signalman 08/MEN/2010

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

Penempatan blower (adm control)

ADM : General Work Permit sesuai Prosedur ,

Terjepit material raised floor

Cedera, luka

3

3

PPE : Pakai Helmet, Sarung tangan

COMMISSIONING TEST ADM : General Work Permit sesuai Prosedur ,

1

Terkena alat kerja

Cedera, luka

Hubungan pendek dari arus listrik

Kematian, cedera, luka

3

3

9

Comissioning test 4

Permenaker Pemasangan Rambu "Hand Gloves dan Training Hand No. M 08/MEN/2010 Safety

3 12 H

PUIL 2000

PPE : Pakai sarung tangan dan sepatu boot Merger test (engineering control)

GROUND FLOOR INTERIOR FINISHING WORK Sirkulasi udara yang kurang baik

1

Ground floor finishing work

Terkena alat kerja

Kejatuhan material pada saat manual handling PEKERJAAN STRUKTUR BAJA

Gangguan pernapasan/ sesak napas

3

3

9

Cedera, luka

3

3

9

Cedera, luka

3

3

9

Permenaker M No. 01/MEN/1980 ttg Keselamatan M dan Kesehatan Kerja pada Kosntruksi Bangunan M

Penempatan blower (adm control)

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot Penggunaan safety helmet (APD)

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

1

Hazard Risk Identified

Terjatuh dari ketinggian

L

Kematian, cedera, luka

4

Cedera, luka

3

Unloading material 2

Terkena alat kerja pemasangan gording dan asesoris

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur, Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H Body Harness" dan Training Penggunaan APD, Permenaker Bekerja di ketinggian, Pemasangan Scaffolding No. 08/MEN/2010 PPE : Pakai Helm + tali dagu dan Safety Body Harness. ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand 3 9 M Safety PPE : Pakai sarung tangan dan sepatu boot

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

STRUKTUR BAJA PODIUM

1

Terjatuh dari ketinggian

Kematian, cedera, luka

4

Terkena alat kerja

Cedera, luka

3

Material jatuh saat diangkat dan mengenai pekerja

Cedera, luka

3

Terjatuh dari ketinggian

Kematian, cedera, luka

4

Unloading material

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / 3 12 H Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Permenaker ADM : General Work Permit sesuai Prosedur , No. Pemasangan Rambu "Hand Gloves dan Training Hand 3 9 M 08/MEN/2010 Safety PPE : Pakai sarung tangan dan sepatu boot ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand 3 9 M Safety PPE : Pakai sarung tangan dan sepatu boot

STRUKTUR BAJA CANOPY

1

Unloading material

Penggunaan safety bellt (APD)

3 12 H Permenaker No. 08/MEN/2010

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

1

Unloading material

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Terkena alat kerja

Cedera, luka

3

3

9

Permenaker ADM : General Work Permit sesuai Prosedur, No. Pemasangan Rambu "Hand Gloves dan Training Hand M 08/MEN/2010

Material jatuh saat diangkat dan mengenai pekerja

Cedera, luka

3

3

9

M

Safety PPE : Pakai sarung tangan dan sepatu boot Penggunaan safety helmet (APD)

Responsibility

L

S

R

Color

Operation/Task Location/Area

3

1

3

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

3

1

3

L

3

L

3

L

WATERPROOFING MEMBRAN

1

2 3 4

Masak aspal waterproof menggunakan kompor gas Melapisi

Terkena alat kerja

Cedera, luka

3

3

9

Terjatuh kedalam lubang galian pohon

Cedera, luka

3

3

9

Tertabrak kendaraan

Cedera, luka

3

3

9

Cedera, luka

3

3

9

Cedera, luka

3

3

9

Unloading pohon Tertimpa, tertampar pohon besar Manual handling yang salah pada Manual handling saat pengangkatan pohon

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand M Permenaker No Safety 01/MEN/1980 PPE : Pakai sarung tangan dan sepatu boot Pasang baricade ttg M

Keselamatan dan Kesehatan Peringatan max. kecepatan selama didalam proyek 10km/jam M 3 1 Kerja pada Konstruksi Pasang baricade M 3 1 Bangunan

Prosedur dan Instruksi Kerja tentang Manual Handling

M

Safety & Supervisor Safety & Supervisor Safety & Supervisor Safety & Supervisor

3

1

3

L

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

AKTIVITAS GONDOLA

1

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. 08/MEN/2010 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Inspeksi rutin (Adm control)

Terjatuh dari ketinggian karena tali Kematian , sling rapuh cedera luka

4

3 12 H

Kematian cedera luka

4

3 12 H Permenaker no

Aktivitas gondola Kondisi bak gondola rapuh

1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement Before

Activitiesgondola / Area Aktivitas

Hazard Risk Identified

L

S

Menimpa orang yang melintas di bawah gondola

Kematian, cedera

4

3

Kondisi rel gondola aus

Kematian, cedera

4

3

RESIDUAL RISK

LEGAL

Permenaker no Control Measure REFERENCE R 1/MEN/1980 ttg Penempatan rambu (Adm control) Keselamatan 12 H dan Kesehatan Kerja pada Inspeksi rutin (Adm control) Konstruksi 12 H Bangunan Color

Item 1

BBS/HSE/General-01 Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

PEKERJAAN ELECTRICAL TEMPORARY Non Rutin Standard panel temporary

1

Memasang dan menghubungkan kabel power ke Panel temporary

Tersengat listrik

2

Penarikan kabel distribusi untuk daya penerangan

Pekerja kesetrum kabel lecet atau Cidera, sambungan kabel tergenang air kematian

Luka, cidera, kematian

4

3 12 H

PUIL 2000

4

3 12 H

PUIL 2000

4

3 12 H

Cek kondisi kabel;

AKTIVITAS PEKERJA Rutin Tertabrak dump truk

1

Pekerja turun naik Terkena manuver Excavator ke area basement

Terpeleset akses licin

Luka, cidera, meninggal

Luka, cidera, meninggal

4

3 12 H

Luka, cidera

3

3

9

M

Buat akses khusus pejalan kaki Permenaker no 1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Buat trap pada akses pejalan kaki

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

2

3

Activities / Area

Hazard Risk Identified

Luka, cidera, meninggal

4

3

Terbentur scaffolding

Cidera

3

3

Pekerja naik turun scaffolding

Sampah makanan Are kerja menjadi kotor, sumber dan minuman penyakit dari makanan busuk

5

Merokok

Kebakaran akibat pembuangan puntung menyala

Sakit Gangguan kesehatan Luka, cidera, meninggal

Permenaker no 1/MEN/1980 12 H ttg Keselamatan dan Kesehatan Kerja pada Konstruksi 9 M Bangunan

3

3

9

M

3

3

9

M

4

3 12 H

RESIDUAL RISK

Control Measure ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Prosedur Rambu

UU No 18 th Pembersihan rutin, buat peraturan House Keeping 2008 Tentang Sampah

3

Mata terpapar sipat

Sakit mata

3

3

9

M

Permenaker Pakai masker dan google No. 08/MEN/2010

Mata terkena debu di lingkungan proyek

Sakit mata

3

3

9

M

3

9

R

2

2

4

L

Safety & Supervisor

1

4

4

L

Safety

2

1

2

L

Safety & Supervisor

Supervisor

4

3

S

& Larangan merokok di area proyek, pemasangan poster dan rambu laranganSafety merokok

Luka, cidera, Meninggal

Gangguan pernafasan

Responsibility

L

2 1 2 L UU No 18 th Supervisor 2008 Tentang Larangan merokok di sembarang tempat, menyiapkan smoking area dan asbak, fuel storage Safetyproteksi & Sampah 2 2 4 L

Surveyor terjatuh kedalam area galian Aktivitas Survey

Aktivitas Supervisor

R

LEGAL REFERENCE

SKB Menaker & Lubang galian selalu di-guard line. Proteksi Bahaya PU 12 H No.174/1986

Terpapar debu 6

S

Terjatuh dari ketinggian

Mengisap asap rokok 4

L

Color

Before

Item

BBS/HSE/General-01 Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

Permenaker Menggunakan kacamata, Disiram dengan air secara berkala No. 2 1 08/MEN/2010

2

L

Safety & Supervisor

2

L

Safety & Supervisor

ADM : General Work Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Masker" dan Training Penggunaan APD dan Penggunaan Respirator No. M 08/MEN/2010 PPE : Pakai Masker / Respirator

2

1

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

7

Menggunakan handtools

Hazard Risk Identified

L

Terkena manuver alat berat

Luka, cidera, meninggal

4

Terkena serpihan alat yang patah

Cidera

3

S

R

Color

Before

Item Activities / Area 6 Aktivitas Supervisor

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , SKB Menaker & Pemasangan Rambu "Awas Manuver Alat Berat" dan PU 3 12 H Training dan Pemasangan Proteksi, Prestart No.174/1986 Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Permenaker Gunakan APD No. 3 9 M

Terkena serpihan material

Cidera

3

3

9

Terkena alat pada posisi tidak ergonomis

Cidera

3

3

9

08/MEN/2010 Permenaker Gunakan APD No. M 08/MEN/2010 SKB Menaker & Bekerja pada posisi yang ergonomis PU M No.174/1986

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

4

L

Safety & Supervisor

4

L

Safety & Supervisor

4

L

Safety & Supervisor

GENSET Non Rutin

1

Unloading dan install genset

Terkena Manuver mobile crane membawa genset

Luka, cidera, kematian

4

3 12 H

Sling crane putus, genset jatuh menimpa pekerja

Luka, cidera, kematian

4

3 12 H

Terjepit/ terhimpit genset saat memposisikan letak

Luka, cidera

3

3

9

M

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart 2 2 Inspection, Pengaturan akses alat berat, Penempatan Permenaker Rigger/ Signalman PPE : Pakai Helmet No. 09/MEN/2010 Prosedur dan Instruksi Kerja ten Crane, liftang ting & rigging 2 2 ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan

2

2

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

R

Color

Before

Item

BBS/HSE/General-01 -

9

Permenaker Pemasangan Rambu "Hand Gloves dan Training Hand No. M 01/MEN/1980 Safety

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Responsibility

ADM : General Work Permit sesuai Prosedur ,

Terkena alat kerja manual (tang, kunci dll) 2

Perbaikan kerusakan

Tersengat listrik

3

Luka, cidera, meninggal Iritasi mata dan kulit

3

3

4

3 12 H

3

3

Luka, cidera, kematian

4

3 12 H

Luka bakar

3

3

Kebakaran dari bahan mudah terbakar (BBM)

Luka, cidera, kematian

4

3 12 H

Kebisingan dari pengoperasian genset

gangguan pendengaran

3

3

Terkena oli dan solar Memasang dan menghubungkan genset ke panel utama

Luka, cidera

Tersengat listrik

PPE : Pakai sarung tangan dan sepatu boot Standard Panel Temporary

Safety & Supervisor Safetycontrol) & Prosedur dan Instruksi kerja yang telah tersusun untuk Working in project (Adm 2 1 2 L Supervisor Standard panel temporary Safety & 2 2 4 L Supervisor 2

2

4

L

2

2

4

L

Safety & Supervisor

SKB Menaker & Maintenance pada area khusus (isolir area dari sumber PU 2 api) No.174/1986

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

PUIL 2000

9

Safety & Supervisor

M

PUIL 2000

Rutin 1

2

Terkena panas mesin alat berat Operasional Genset dan genset saat pengantian spare part dan membersihkan genset

Maintenance

9

M

Permenaker Pakai Sarung Tangan dan Sepatu Kerja No. 08/MEN/2010

Kep.Men No. Pemakaian silent genset atau pemasangan M Kep.51/MEN/ soundproof, operator pakai Ear plug 1999

Pakai Sarung Tangan dan Sepatu Kerja

Terkena panas mesin alat berat dan genset saat pengantian spare part dan membersihkan genset

Luka bakar

3

3

9

M

Terkena cipratan oli dan solar

Iritasi mata dan kulit

3

3

9

M

Pekerjaan dan perawatan alat berat Rutin & non rutin

9

Permenaker No. 08/MEN/2010 Prosedur dan Instruksi kerja yang telah tersusun untuk

Working in project (Adm control)

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Terjatuh dari tower crane

1

Luka, cedera, kematian

L

4

S

R

Color

Before

Item

LEGAL REFERENCE

3 12 H

anggota tubuh terjepit material

Luka, cedera

3

3

Permenaker no 12 H 1/MEN/1980 ttg Keselamatan 12 H dan Kesehatan Kerja pada Konstruksi Bangunan 9 M

Tangan / anggota tubuh terjepit sling

Luka, cedera

3

3

9

3

Kepmenaker & Trans RI No. Kep75/MEN/2002 ttg 12 H Pemberlakuan SNI-04-02252000 mengenai PUIL 2000 di tempat kerja

Material terjatuh Aktifitas tower crane, mobile tabrakan antar TC crane, crawler crane, dan unicrane

Panel terbakar

Luka, cedera, kematian Luka, Cidera, meninggal

Luka, cedera, kematian

4

3

4

3

4

M

BBS/HSE/General-01 RESIDUAL RISK

Control Measure ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur, Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Gunakan teknik sesuai WI lifting rigging, tower crane, dan telescoping Menggunakan radio HT khusus untuk operator dan rigger untuk kelancaran komunikasi rigger-operator, mengganti channel bermasalah ke channel ADM : General Workyang Permit sesuai Prosedur , yang Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Cek instalasi panel, grounding dan nilai hambatan grounding, dan kunci panel listrik

Responsibility

L

S

R

Color

Operation/Task Location/Area

1

3

3

L

Safety & Operator

2

2

4

L

Safety & rigger

2

2

4

L

Safety & Construction

1

2

2

L

Safety & rigger

1

2

2

L Rigger & Helper

2

2

4

L

Safety, mekanik TC

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

2

Activities / Area

Aktifitas Ph / Material Hoist

Hazard Risk Identified

Boom crane patah

4

3

Tertabrak manuver mobile / crawler crane

Luka, cedera, kematian

4

3

R

Kepmenaker & Trans RI No. Kep75/MEN/2002 ttg 12 H Pemberlakuan SNI-04-02252000 mengenai PUIL 2000 di tempat kerja

Luka, cedera, kematian

4

3

Cage terjatuh

Luka, cedera, kematian

4

3 12 H

Tertabrak manuver excavator

Luka, cedera, kematian

Luka, cedera, kematian Luka, cedera, kematian

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

L

S

R

Permenaker no Perketat inspeksi pre mob, beri ID card untuk authorized operator 1/MEN/1980 12 H 2 2 4 L ttg Keselamatan Barikade area aktifitas excavator dan Kesehatan 12 H 2 2 4 L Kerja pada Konstruksi

Panel terbakar

Material terjatuh Aktifitas Excavator

S

Luka, cidera, kematian

Terjatuh dari akses PH

3

L

Color

Before

Item

BBS/HSE/General-01 Color

Operation/Task Location/Area

Permenaker no 1/MEN/1980 ttg 12 H Keselamatan dan Kesehatan Kerja pada Konstruksi 12 H Bangunan

4

3

4

3

4

3 12 H

Responsibility Safety Supervisor Safety & Supervisor

Cek instalasi panel, grounding dan nilai hambatan grounding, dan kunci panel listrik

Jangan melebihi kapasitas beban, sediakan rambu PH ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding s PPE : Pakai Helm + tali dagu dan Safety Body Harness Barikade saat erection, jaga material tidak di pinggir Barikade area aktifitas excavator

2

2

4

L

Safety, mekanik TC

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & rigger

2

2

4

L

Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

4

5

Activities / Area

Aktifitas Forklift

Aktifitas Placing boom

Hazard Risk Identified

L

S

R

Color

Before

Item

Terkena manuver alat berat (excavator dan dump truck)

Luka, cidera, kematian

4

3 12 H

Kabel / pipa tergaruk excavator

Kerusakan properti

3

3

Tertabrak manuver forklift

Luka, cedera, kematian

4

3 12 H

9

Luka, cedera

3

3

9

M

Forklift terbakar

Kerusakan properti

3

3

9

M

Tersandung karena pipa placing boom

Luka, cedera

3

3

9

M

Luka, cedera

3

Placing boom runtuh

Luka, cedera, kematian

4

RESIDUAL RISK

Control Measure ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet Mengetahui jalur kabel / pipa

M

Terjatuh dari forklift

Anggota tubuh terjepit pipa

LEGAL REFERENCE

BBS/HSE/General-01 -

Barikade area aktifitas forklift

S

R

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

1

3

L

Safety & operator

1

2

L

Safety & operator

1

3

L

Safety

1

2

2

L

Supervisor

2

1

2

L

Safety, supervisor, operator

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur Pemasangan Rambu "Gunakan Safety Body Harness / 3 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Jauhkan material mudah terbakar dari stasiun charging 2 forklift Pasang jembatan akses di atas pipa 3

ADM : General Work Permit sesuai Prosedur Pemasangan Rambu "Awas Terjepit " dan Training 3 9 M Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Pastikan pin terpasang pada placing boom base, gunakan teknik lifting riging sesuai WI, dan pastikan 3 12 H Per.01/MEN/19 baja landasan placing boom telah selesai dipasang 82 tentang Bejana Tekan

Responsibility

L

Color

Operation/Task Location/Area

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Aktifitas Placing boom Activities / Area

6

Risk Assessment No. Method Statement Before

Hazard Risk Identified

L

Anggota tubuh tertabrak pipa saat Luka, cedera, pengecoran kematian

4

Pekerja terkena bola karet saat blasting dilakukan

Luka, cedera, kematian

4

Material (PC façade) terjatuh

Luka, cedera, kematian

4

S

R

Aktifitas Jib Crane

RESIDUAL RISK

Control Measure

Per.01/MEN/19 82 tentang Dilarang berada terlalu dekat ujung pipa saat Bejana Tekan penembakan pertama dilakukan

L

S

R

dan Kesehatan Kerja pada Konstruksi Bangunan Inspeksi wire rope, gunakan teknik lifting rigging sesuai

Material AW terjatuh

Luka, cedera, kematian

4

Responsibility

Safety, supervsor, 3 12 H 2 1 2 L operator, pekerja Safety, Dilarang berada terlalu dekat ujung pipa saat penembakan pertama dilakukan supervsor, 3 12 H 2 1 2 L operator, pekerja Inspeksi wire rope, gunakan teknik lifting rigging sesuai WI, dan jangan sampai wire rope terhantam bagian bangunan Safety, Permenaker no supervsor, 1/MEN/1980 3 12 H 2 1 2 L operator, ttg Keselamatan pekerja

Aktifitas Customized Jig 7

LEGAL REFERENCE

BBS/HSE/General-01 Color

5 Item

General Project Activities Project Site

Color

Operation/Task Location/Area

3 12 H

WI, dan jangan sampai wire rope terhantam bagian bangunan

2

1

2

L

Safety, supervsor, operator, pekerja

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

S

R

3

Kepmenaker & daya jib crane, kunci panel listrik dan beri PIC Trans RI No. Kep75/MEN/2002 ttg 12 H Pemberlakuan SNI-04-02252000 mengenai PUIL 2000 di tempat kerja

L

S

R

Color

Operation/Task Location/Area

Responsibility

Pastikan kemampuan panel sesuai dengan kebutuhan

Panel terbakar / meledak

Luka, cedera, kematian

4

Safety, supervsor, operator, pekerja

3

1

3

L

1

2

2

L Safety ,operator

1

4

4

L

2

1

2

L Safety, operator

Gunakan earplug dan atur jam kerja di dekat area

8

Bising

Luka, cedera

3

3

9

Kepmenaker & genset serta pasang rambu Trans No. Kep. : 51/MEN/2011 M ttg NAB Faktor Fisika di Tempat Kerja

9

Permenaker no ADM : Sediakan oil trap dan pasir atau serbuk kayu 1/MEN/1980 ttg Keselamatan M dan Kesehatan Kerja pada Konstruksi Bangunan

Aktifitas Generator Set

ENG : Pasang oil trap

Ceceran BBM atau oli ke tanah

Kerusakan properti

3

3

Kebakaran

Luka, cedera, kematian

4

3 12 H

Sediakan APAR CO2, pasang grounding di genset, panel, dan fuel tank, dilarang merokok di area genset

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

9

10

11

Activities / Area

Hazard Risk Identified

Aktifitas truk (dump truk, mixer truk, Tertabrak manuver truk trailer truk)

Membersihkan alat

Luka, cedera, kematian

L

4

S

R

Color

Before

Item

Luka, cedera, kematian

4

3 12 H

Terkena panas mesin alat berat membersihkan genset

Luka bakar

3

3

Kebakaran dari bahan mudah terbakar (BBM)

Luka, cidera, kematian

4

3 12 H

Kebisingan dari pengoperasian genset

gangguan pendengaran

3

3

Terkena oli, gemuk dan solar

9

9

M

RESIDUAL RISK

Control Measure

Responsibility

L

S

R

2

1

2

L

Safety, security, supervisor

2

2

4

L

Pekerja

2

2

4

L

Safety & Supervisor

SKB Menaker & Maintenance pada area khusus (isolir area dari sumber PU 2 api) No.174/1986

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

SKB Menaker & Maintenance pada area khusus (isolir area dari sumber PU 2 api) No.174/1986

1

2

L

Safety & Supervisor

2

4

L

Safety & Supervisor

Atur lalu lintas truk, sediakan akses khusus pejalan kaki,

3 12 H

Terjatuh dari truk

Menganti spare part Terciprat oli dan oli

LEGAL REFERENCE

BBS/HSE/General-01 Color

Operation/Task Location/Area

Permenaker No. 08/MEN/2010

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding . PPE : Pakai Helm + tali dagu dan Safety Body Harness Pakai Sarung Tangan dan Sepatu Kerja

Kep.Men No. Pemakaian silent genset atau pemasangan M Kep.51/MEN/ soundproof, operator pakai Ear plug 1999

Luka bakar

3

3

9

Permenaker No. M 08/MEN/2010

Iritasi kulit dan mata

3

3

9

M

Pakai Sarung Tangan dan Sepatu Kerja

ADM : General Work Permit sesuai Prosedur

Terkena alat kerja manual

Luka, cidera

2

3

6

M

Kep.Men No. Pemasangan Rambu "Hand Gloves dan Training Hand Kep.51/MEN/ Safety 1999

PPE : Pakai sarung tangan dan sepatu boot

Gudang

2

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT Operation/Task Location/Area

General Project Activities Project Site

Risk Assessment No. Method Statement

Hazard Risk Identified

L

S

RESIDUAL RISK

LEGAL REFERENCE

Control Measure

R

9

Kep.Menkes Pakai masker No. 1405/MENKES/ M SK/XI/2002; Permenaker No. 08/MEN/2010

Responsibility

L

S

R

Color

Activities / Area

Color

Before

Item

BBS/HSE/General-01 -

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

Permenaker Pemasangan Rambu "Hand Gloves dan Training Hand No. M 08/MEN/2010 Safety

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Rutin

1

2

Penyimpanan dan pengambilan Kontaminasi Debu semen semen dan Mortar

Aktivitas Workshop Bekisting Table Tertimpa bekisting roboh Form

Sakit/ gangguan pernafasan

Luka, Cidera, meninggal

3

4

3

3 12 H

Permenaker no 1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Pasang baricade area dan rambu-rambu;

ADM : General Work Permit sesuai Prosedur,

Terkena benda tajam saat membersihkan Terkena material bekisting yang tidak terpasang dengan baik 3

Loading / Unloading Mata dan kulit Terkena oil kist BBM dan Oli

Luka, cidera

2

3

6

Luka, Meninggal

3

3

9

M

Iritasi mata dan kulit

3

3

9

M

PPE : Pakai sarung tangan Pemasangan pin dengan baik yang belum terpasang dan baricade

Permenaker no 1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Pakai sarung tangan dan google

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

Kebakaran BBM

Mata dan kulit terkena solar dan oli WORKSHOP FABRIKASI PEMBESIAN

L

S

R

Color

Before

Item

Luka, Cidera, meninggal

4

3 12 H

Iritasi mata dan kulit

3

3

Luka, Cidera, meninggal

4

3 12 H

9

LEGAL Permenaker REFERENCE no 1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure Pemasangan Grounding saat Unloading material dan pemasangan rambu " Dilarang menyalakan api", dilarang merokok" dan lokalisir area saat unloading BBM

Pakai sarung tangan dan google

M

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

Rutin 1

2

Unloading besi beton

Potong bengkok besi

Tertimpa besi beton

SKB Menaker & Prosedur dan Instruksi Kerja tentang crane, lifting & PU rigging No.174/1986

Terkena swing TC menurunkan besi

Luka, Cidera, meninggal

4

3 12 H

SKB Menaker & PU No.174/1986

Terjepit besi beton

Luka, Cidera

3

3

9

M

SKB Menaker & PU No.174/1986

Terjepit besi

Luka, Cidera

3

3

9

M

SKB Menaker & PU No.174/1986

Tersengat listrik kabel power alat terkelupas karena tertumpuk besi

Luka, Cidera, meninggal

4

3 12 H

PUIL 2000

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training danPemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit "dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Housekeeping, Inspeksi kondisi kabel power sebelum digunakan.

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

3

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

M

RESIDUAL RISK

LEGAL REFERENCE

SKB Menaker & PU No.174/1986 SKB Menaker & PU M No.174/1986

BBS/HSE/General-01 Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

Instruksi Kerja tentang Rebar bending and cutting operation

2

1

2

L

Safety & Supervisor

Instruksi Kerja tentang Rebar bending and cutting operation

2

1

2

L

Safety & Supervisor

Tertusuk tajam besi

Luka, Cidera

3

3

9

Terkena putaran bar bending/ cutting

Luka, Cidera

3

3

9

Penumpukan waste Pekerja tersandung tumpukan besi Luka, Cidera dan hasil fabrikasi dan waste besi tidak rapi

3

3

9

M

SKB Menaker & Pakai sarung tangan dan google PU No.174/1986

2

1

2

L

Safety & Supervisor

2

3

6

M

SKB Menaker & Pemakaian Tangga atap PU No.174/1986

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

Maintenance Kantor dan Gudang Non rutin 1

Pengantian atap asbes rusak

Terperosok karena menginjak bagian atap tanpa tulangan

Luka, cidera

Jatuh dari ketinggian

Luka, cidera, kematian

Prosedur dan Instruksi Kerja tentang Bekerja

2

Perbaikan atap bocor

4

3 12 H

Permenaker diketinggian No. 01/MEN/1980

ADM : General Work Permit sesuai Prosedur 3

Terpapar debu

Sakit pernafasan

3

3

9

Permenaker Pemasangan Rambu "Gunakan Masker" dan Training No. M Penggunaan APD danPenggunaan Respirator 08/MEN/2010 PPE : Pakai Masker / Respirator

Terpeleset karena lantai licin saat dipel

Luka, cidera

3

3

9

M

Pembersihan kantor dan gudang

Non rutin

Pasang rambu "lantai Licin",

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Pengantian lampu neon putus

Terjatuh dari tangga

Luka, cidera

2

3

6

5

Perbaikan atap bocor

Terjatuh dari plafond/ atap

Luka, cidera

3

3

9

Luka, Cidera

2

3

6

M

Menabrak kendaraan lain

Luka, Cidera

2

3

6

M

Tersandung lahan tidak rata

Luka, cidera

2

3

6

M

9

Permenaker Pemasangan Rambu "Gunakan Masker" dan Training No. M Penggunaan APD danPenggunaan Respirator 08/MEN/2010 PPE : Pakai Masker / Respirator

AKTIVITAS SUPPLIER AIR NINERAL GALON Mengangkat air 1 Galon menimpa kaki mineral galon 2

Parkir kendaraan

R

2

2

L

Safety & Supervisor

2

2

L

Safety & Supervisor

2

1

2

L

Logistik

2

1

2

L

Security

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

L

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. M 1 Body Harness" dan Training Penggunaan APD, Bekerja 01/MEN/1980 di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. M 1 Body Harness" dan Training Penggunaan APD, 08/MEN/12010 Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

4

UU N0 1 th 1970

Prosedur dan Instruksi Kerja tentang Mannual Handling Mengarahkan kendaraan dengan baik saat hendak parkir.

Responsibility

S

Color

Operation/Task Location/Area

AKTIVITAS SURVEYOR UU N0 1 th 1970

Pemasangan Rambu ADM : General Work Permit sesuai Prosedur ,

Terpapar debu dan serbuk tinta 1

Pengukuran

Sakit pernafasan

3

3

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

1

Pengukuran

Hazard Risk Identified

L

S

R

Color

Before

Item

Terjatuh dari ketinggian

Luka, cidera, kematian

4

3 12 H

Tersandung lahan tidak rata

Luka, cidera

3

3

BBS/HSE/General-01 RESIDUAL RISK

LEGAL REFERENCE

Control Measure

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. Body Harness" dan Training Penggunaan APD, 01/MEN/1980 Bekerja di ketinggian, Pemasangan Scaffolding s PPE : Pakai Helm + tali dagu dan Safety Body Harness

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety

2

2

4

L

Safety

2

4

L

Safety & Supervisor

1

3

3

L

Safety & FASO

1

3

3

L

Safety & FASO

1

2

2

L

Safety & FASO

AKTIVITAS SAFETY PATROL

1

Patroli / Inspeksi Terpapar debu

Terjatuh dari ketinggian

Sakit pernafasan

3

3

Perataan lahan

9

M

9

Permenaker ADM : General Work Permit sesuai Prosedur, No. Pemasangan Rambu "Gunakan Masker" dan Training M 08/MEN/2010 Penggunaan APD dan Penggunaan Respirator

PPE : Pakai Masker / Respirator

Luka, cidera, kematian

4

3 12 H

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Permenaker Pemasangan Rambu "Gunakan Safety Body Harness / No. 2 01/MEN/1980 Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness

sakit penglihatan

3

3

9

M

UU No 1 tahun Prosedur dan Instruksi Kerja tentang Office Safety 1970

Sakit, tidak nyaman

3

3

9

M

Per.02/MEN/19 80

Sakit, tidak nyaman

3

3

9

M

AKTIVITAS KANTOR PROYEK Radiasi dari Monitor Komputer Statis dalam waktu lama, perlengkapan kerja tidak ergonomis Perlengkapan kerja tidak ergonomis

Prosedur dan Instruksi Kerja tentang Office Safety

Mengatur posisi perlengkapan & peralatan kerja sehingga ergonomis

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

1

Activities / Area

Aktivitas Perkantoran

Hazard Risk Identified

L

S

R

Color

Before

Item

BBS/HSE/General-01 RESIDUAL RISK

LEGAL REFERENCE

Control Measure

Debu pada file

Sakit pernafasan

2

3

6

Kep.Menkes Pembersihan rutin No. M 1405/MENKES/ SK/XI/2002

Tersengat Listrik kabel luka

Luka, cidera

3

3

9

M

PUIL 2000

Tersandung kabel tidak rapi

Luka, cidera

2

3

6

M

PUIL 2000

Hubungan pendek akibat pemakaian steker bertumpuk / kabel terbakar

Kebakaran

3

3

9

M

PUIL 2000

Bau dari tempat sampah

Sakit

3

3

9

M

Jatuh akibat tersandung kabel

Luka, cidera, kerusakan aset

3

3

9

M

9

PP RI No. 82 Th. 2001. Pengelolaan M Kualitas Air dan Pengendalian Pencemaran Air

Prosedur dan Instruksi Kerja tentang Office Safety Housekeeping perlengkapan kabel yang baik Pemaangan rambu "Dilarang Memakai Steker bertumpuk"

SKB Menaker & Penyediaan tempat sampah tertutup untuk di toilet PU dan pembuangan rutin setiap hari No.174/1986 PUIL 2000

Perapihan kabel / penggunaan conduit

L

S

R

Color

Operation/Task Location/Area

Responsibility

1

2

2

L

Safety & FASO

2

2

4

L

Safety & FASO

2

1

2

L

Safety & FASO

1

3

3

L

Safety & FASO

1

2

2

L

Safety & FASO

1

2

2

L

Safety & FASO

2

2

4

L

Safety & FASO

1

3

3

L

Safety & FASO

2

2

4

L

Safety & FASO

2

2

4

L

Safety & FASO

Mengkonsumsi air minum dalam kemasan / galon

Kualitas air sumur tidak memenuhi Sakit syarat untuk dikonsumsi pencernaan

Ruang kerja kurang terang Tertekan karena kompetensi kurang Tertekan karena lingkungan kerja tidak nyaman

3

3

Sakit penglihatan, kesalahan dalam kerja

3

3

9

KepMenaker No. M 51/MEN/1999

stress

3

3

9

M

stress

3

3

9

M

Prosedur dan Instruksi Kerja tentang Office Safety

Per.02/MEN/19 Training/ sosialisasi 80

Prosedur dan Instruksi Kerja tentang Office Safety

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement Before

Activities / Area

Hazard Risk Identified

Control Measure

L

S

R

Penyebaran penyakit menular

2

3

6

M

Aktivitas Mesin Foto Terhirup serbuk Tooner saat Copy penggantian Tooner

Gangguan pernafasan

3

3

9

M

Toilet dan Wudhu di Site Office dan Bau / tidak higienis / sampah proyek

sakit

2

3

6

Pembersihan rutin / penyediaan tempat sampah M UU No. 3/ 1969 tertutup, rambu "jagalah Kebersihan"

Luka, cidera

3

3

9

M

9

Permenaker no 1/MEN/1980 ttg Keselamatan M dan Kesehatan Kerja pada Konstruksi Bangunan

Bakteri di udara

2

RESIDUAL RISK

LEGAL REFERENCE

Color

Item

BBS/HSE/General-01 L

S

R

Color

Operation/Task Location/Area

Responsibility

1

2

2

L

Safety & FASO

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety

2

2

4

L

Safety

2

2

4

L

Korlap

Dilakukan pengukuran intensitas bakteri di udara /

PP RI No. 41 Th. pemasangan AC dan exhaust 1999 Permenaker Pakai masker No. 08/MEN/2010

MCK 1

Terpeleset karena lantai licin

SKB Menaker & Pembersihan KM rutin PU No.174/1986

AKTIVITAS SECURITY Prosedur dan Instruksi Kerja tentang Site Security

Kehilangan/ Tamu membawa bahan berbahaya, Kecurian, mencuri dsb ancaman dll 1

2

3

3

Aktivitas Tamu

Penugasan security

Safety Induction, mendampingi tamu bila ke site

Tamu terkena bahan berbahaya, tertimpa material, terjatuh, tergelincir dll

Luka, cidera, meninggal

4

3 12 H

Kelelahan karena kerja di malam hari, Konsentrasi kerja menurun

Cidera

3

3

Disiplin untuk isirahat ketika off 9

M

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

1

2

L

Safety & Supervisor

2

1

2

L

Security

AKTIVITAS SUPPLIER / PENGIRIMAN MATERIAL KE PROYEK 1

Galon menimpa kaki

Luka, Cidera

2

3

6

M

Menabrak kendaraan lain

Luka, Cidera

2

3

6

M

Kendaraan material 2

Manual handling

SKB Menaker & Prosedur dan Instruksi Kerja tentang Manual handling PU No.174/1986

Pengaturan parkir oleh security

AKTIVITAS PADA MALAM HARI (OVER TIME)

Sakit, cidera

3

3

9

Terperosok tanah yang lunak, Cedera, luka terperosok ke lubang, terkena stek

3

3

9

Permenaker Pengaturan jadwal kerja, TBM no 1/MEN/1980 ttg Keselamatan M 1 2 2 L dan Kesehatan Kerja pada Konstruksi Bangunan Penempatan rambu , pasang baricade, proteksi stek dengan selang M 4 1 4 L

Penglihatan terganggu

3

3

9

M

Kondisi stamina menurun, tidak waspada, terjatuh/ tersandung

1

Aktivitas kerja pada malam hari

Penerangan yang terbatas AKTIVITAS DI MESS BARU

Penempatan penerangan di titik-titik strategis

2

1

2

L

Safety

Safety Safety & Supervisor

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

R

Color

Before

Item

BBS/HSE/General-01 RESIDUAL RISK

LEGAL REFERENCE

Control Measure

L

S

R

Color

Operation/Task Location/Area

Responsibility

2

1

2

L

Safety & FASO

2

2

4

L

Safety & FASO

2

1

2

L

Safety & FASO

2

1

2

L

Safety & FASO

2

2

4

L

Safety & FASO

2

2

4

L

Safety & FASO

2

1

2

L

FASO

2

1

2

L

FASO

1

2

2

L

FASO

1

2

2

L

FASO

Dilakukan Fogging secara rutin (engineering control)

1

2

3

Menempati Mess Pekerja

Sampah

Aktivitas MCK

Digigit serangga / nyamuk

Sakit

3

3

9

Permenaker no 1/MEN/1980 ttg Keselamatan M dan Kesehatan Kerja pada Konstruksi Bangunan

Kurang ventilasi, panas

sakit

2

3

6

M

Tergelincir/ jatuh karena beda ketinggian atau naik turun tangga

Luka, cidera

2

3

6

M

Kotoran sampah dan baju kerja kotor disangkutan

Sakit menular, tidak nyaman

2

3

6

M

Dinding runtuh karena bangunan tua

Cedera, luka

3

3

9

M

Pekerja lalai merokok

Kebakaran , kematian, luka, 4 cedera

Penempatan pendingin ruangan atau kipas angin Sign di area-area tertentu yang berpotensi

3 12 H

Berbau

Tidak nyaman

2

3

6

M

Sampah meluap

Tidak nyaman

2

3

6

M

Lantai kamar mandi licin

Cedera, luka

2

3

6

M

Lubang WC tersumbat

Berbau dan tidak nyaman

2

3

6

M

Penempatan tempat kotoran sampah dengan membedakan 3 jenis Penempatan jaring pengaman (Engineering control) Sosialisai utk menghindari dari bahaya rokok (Adm control) UU No 18 th Sampah dimasukkan dalam kantong plastik hitam, 2008 Tentang Pembersihan rutin dan penempatan tempat sampah Sampah sesuai dengan klasifikasi sampah

pengeluaran rutin Per.03MEN/198 Pembersihan rutin dan pengisian checklist kebersihan 2

Pembersihan rutin dan pengisian checklist keberishan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

4

Jaringan listrik

5

Perjalanan dari barak ke proyek

Hazard Risk Identified Hubungan pendek akibat pemakaian steker bertumpuk / kabel terbakar

Kebakaran, cedera, luka

LEGAL REFERENCE

RESIDUAL RISK

Control Measure

L

S

R

Color

Before

Item

BBS/HSE/General-01 -

3

3

9

M

9

UU no 22 tahun M 2009 tentang rambu dan disosialisasikan saat Induction Training Lalu Lintas

9

Permenaker no Pemasangan Rambu "Hand Gloves dan Training Hand 1/MEN/1980 Safety ttg PPE : Pakai sarung tangan dan sepatu boot Keselamatan M dan Kesehatan Kerja pada Konstruksi Bangunan

L

S

R

Color

Operation/Task Location/Area

Responsibility

2

1

2

L

FASO

2

2

4

L

FASO

2

1

2

L

FASO

3

1

3

L

FASO

2

1

2

L

Supervisor

Meger test, Inspeksi rutin PUIL 2000

Pembuatan jalur khusus pekerja dilengkapi dengan

Tertabrak mobil

Cedera, luka

3

3

ADM : General Work Permit sesuai Prosedur ,

6

Pembongkaran dan perapihan barak Terkena alat kerja lama

Terkena swing excavator

7

Pembersihan lahan Terkena alat kerja

AKTIVITAS KLINIK

Cedera, luka

3

3

Meninggal, cedera, luka

4

3 12 H

Cedera, luka

3

3

9

M

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan dan sepatu boot

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

1

Activities / Area

L

S

R

LEGAL REFERENCE

Obat-obat kadaluarsa

Keracunan / alergi

3

3

9

Permenaker No. M 08/MEN/2010

Penanganan pasien

Terinfeksi / 3 tertular pasien

3

9

M

Sampah medis

Infectious

3

3

9

M

Tersengat Listrik kabel luka

sakit

3

3

9

M

Aktivitas klinik

AKTIVITAS DAPUR Memasak kopi 1 dengan listrik 2

Hazard Risk Identified

Color

Before

Item

Memasak air Kebakaran akibat Gas bocor karang Luka, cidera dengan kompor gas pemasangan kurang kuat LPG

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

L

S

R

Color

Operation/Task Location/Area

Responsibility

3

1

3

L

Paramedic

2

2

4

L

Paramedic

2

2

4

L

Paramedic

3

1

3

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

1

3

3

L

Safety & FASO

Pengecekan berkala

Penggunaan sarung tangan karet dan masker (APD)

Dibuang ke kantong plastik

PUIL 2000

3

3

9

Per.01/MEN/19 82 tentang M Bejana Tekan

Tersiram air panas

Luka, cidera

3

3

9

M

Gas bocor

Sesak nafas, sakit pernafasan

3

3

9

M

Menabrak, tertabrak

Luka, cidera, meninggal

3

4 12 H

Cek kondisi alat sebelum mengggunakan Pemasangan pengaman tambahan, inspeksi berkala

Pasang rambu hati-hati tumpah Pemasangan pengaman tambahan, inspeksi berkala

LAIN- LAIN 1

Kondisi Lalu lintas sekitar proyek

SKB Menaker & Pengaturan trafik oleh security PU No.174/1986

Lokalisir merokok pada area khusus merokok di

2 Merokok

Merokok di lapangan dan dikantor, Kebakaran, membuang puntung menyala sakit sembarangan

3

3

9

Perda DKI No. 2 Tahun 2005 / lapangan dan kantor, pasang rambu-rambu M Per.Gub DKI No. 75/2005

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

3 Manual Handling 4

Aktivitas Tamu

Hazard Risk Identified Kesalahan posisi dalam mengangkat, memindahkan, mengeser

L

S

R

Color

Before

Item

3

3

9

M

4

3 12 H

BBS/HSE/General-01 RESIDUAL RISK

LEGAL REFERENCE

Control Measure

L

S

R

Color

Operation/Task Location/Area

Responsibility

2

2

4

L

Safety & FASO

1

2

2

L

FASO

2

2

4

L

FASO

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

Prosedur dan Instruksi Kerja tentang Manual Handling Cidera

Kehilangan/ Tamu membawa bahan berbahaya, Kecurian, mencuri dsb ancaman dll Tamu terkena bahan berbahaya, tertimpa material, terjatuh, tergelincir dll

Luka, cidera, meninggal

Tertimpa material dari lantai atas

Luka, cidera, meninggal

4

SKB Menaker & Site Security PU No.174/1986

3

SKB Menaker & Safety Induction, mendampingi tamu bila ke site project PU 12 H No.174/1986

3

SKB Menaker & board PU 12 H No.174/1986

Area galian/ basement dipasang baricade dengan Toe

5

Aktivitas Pekerja dilantai Bawah/ Basement

6

Menempati Barak Pekerja

4

Kepmenakes Dilakukan Fogging secara rutin No. M 1405/Menkes/S K/XI/2002 Kepmenakes Buat ventilasi pada kamar No. M 1405/Menkes/S K/XI/2002

Digigit serangga / nyamuk

Sakit

2

3

6

Kurang ventilasi, panas

sakit

3

3

9

Tergelincir/ jatuh karena beda ketinggian atau naik turun tangga

Luka, cidera

2

3

6

M

Kotoran sampah dan baju kerja kotor disangkutan

Sakit menular, tidak nyaman

6

SKB Menaker & kebersihan diantara penghuni PU M No.174/1986

SKB Menaker & Pemasangan Railling Tangga PU No.174/1986

Buat peraturan Barak pekerja, dilakukan piket

2

3

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

7

Activities / Area

Hazard Risk Identified

Perjalanan/ Jalan kaki dari Site Office Tertabrak/ terserempet kendaraan Luka, cidera Ke Site Project saat menyeberang (melewati akses keluar senayan square)

8

L

S

R

Color

Before

Item

RESIDUAL RISK

LEGAL REFERENCE

Control Measure

Responsibility

L

S

R

1

2

2

L

Safety & Supervisor

1

3

3

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

1

2

L

Safety & Supervisor

2

2

4

L

FASO

2

2

4

L

FASO

Pembuatan jalur khusus pekerja dilengkapi dengan rambu dan disosialisasikan saat Induction Training 2

3

6

M

UU no 22 tahun 2009 tentang Lalu Lintas

SE.Menakertran mendirikan Kantin/ Warung dalam lokasi proyek s 01/Men/ 1979

Pemberlakuan dan sosialisasi Peraturan/ Persyaratan

Tidak Higienis

Sakit pencernaan

3

3

9

M

Penggunaan Asbes untuk atap kantin

Asbestosis

3

3

9

M

3

Per.01/MEN/19 82 tentang dan APAR 12 H Bejana Tekan

Aktivitas Kantin

BBS/HSE/General-01 Color

Operation/Task Location/Area

Permenaker Pemasangan Plafond atau pengecatan asbes No. 03/MEN/1985

Sosialisasi penggunaan LPG, Penyediaan karung goni

Kebakaran akibat penggunaan Kompor dan LPG

Kematian

4

Office Safety

9

Faktor psikologis

PP 50 tahun 2012 tentang Penerapan Sistem M Manajemen Keselamatan dan Kesehatan Kerja

Perasaan tertekan karena kurang mahir dalam pekerjaan, dimarahi atasan

sakit, stress

3

3

Kurang tidur karena kerja lembur

Luka, cidera, meninggal

4

3 12 H

9

Office Safety

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified Kurang konsentrasi karena rindu keluarga dan kampung halaman

10 Angin kencang

S

4

3 12 H

3 12 H

Kurang konsentrasi karena kendaraan hilang di parkiran

Luka, cidera, meninggal

4

3 12 H

Kurang konsentrasi dalam bekerja Luka, cidera, karena Emosi sedang konflik meninggal dengan rekan

4

3 12 H

benda jatuh akibat angin kencang mengenai pekerja

4

3 12 H

Luka, cidera, meninggal

Luka, cidera, meninggal

Luka, cidera

RESIDUAL RISK

LEGAL REFERENCE

Control Measure Office Safety

L

S

R

Responsibility

2

2

4

L

FASO

2

2

4

L

FASO

2

2

4

L

FASO

2

2

4

L

FASO

2

2

4

L

FASO

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Office Safety 4

Area kerja tergenang air menjadi licin, alat tergelincir mengenai pekerja

Hujan deras

L

Kurang konsentrasi bekerja karena Luka, cidera, kendaraan terserempet orang saat meninggal diparkir

Pekerja terjatuh dari scaffolding karena angin kencang

11

Luka, cidera, meninggal

R

Color

Before

Item

BBS/HSE/General-01 Color

Operation/Task Location/Area

Office Safety Office Safety

4

3

Per.1/MEN/198 Instruksi Kerja pada saat kondisi hujan 0

3 12 H

3

9

Permenaker no 1/MEN/1980 ttg Keselamatan M dan Kesehatan Kerja pada Konstruksi Bangunan

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Aturan Rambu dan Proteksi Bahaya

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified Area kerja tergenang air menjadi licin, pekerja tergelincir, jatuh setempat Area kerja tergenang air menjadi licin, pekerja tergelincir, jatuh kedalam kolam-kolam air

12

Area kerja panas (heatstress)

13 Petir

14 Penggunaan Blower

KEADAAN DARURAT

L

S

R

Color

Before

Item

3

3

9

M

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

S

R

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Aturan Rambu dan Proteksi Bahaya Luka, cidera

Responsibility

L

Color

Operation/Task Location/Area

Aturan Rambu dan Proteksi Bahaya Luka, cidera

3

3

9

M

Menyebabkan kolam-kolam air, pekerja terperosok kedalam kolam Luka, cidera galian

3

3

9

M

2

2

4

L

Safety & Supervisor

3

9

Per.1/MEN/198 Pasang tenda peneduh, buat rest area dengan atap 0; M Kep.51/MEN/1 999

2

2

4

L

Safety & Supervisor

3

Per.02/MEN/19 Pasang penangkal petir pada TC dengan covering area 89 ttg 12 H Pengawasan Instalasi Penyalur Petir

2

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Pekerja mudah emosi, terjadi keributan/ perkelahian antar pekerja, pekerja dengan safety, pekerja dengan supervisor

Luka, cidera

Pekerja di area terbuka tersambar Kematian petir

Aturan Rambu dan Proteksi Bahaya

3

4

Hubungan arus pendek akibat penggunaan steker bertumpuk

Kebakaran

3

3

9

Per.1/MEN/198 0; PP RI No. 41 Th. 1999; M KepMenLH 45 tahun 1997; kepMenh 13 th 95

Outflow debu

Sesak nafas, sakit pernafasan

3

3

9

M

Rambu, dilarang menggunakan steker bertumpuk

Memantulkan outflow ke dalam air

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

Color

Before

Item

LEGAL REFERENCE

S

R

3

Perda DKI Jakarta No. 3 Tahun 1992 ttg penanggulanga n bahaya 12 H kebakaran dalam wilayah khusus Ibu Kota Jakarta

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

1

3

3

L

Safety & Supervisor

1

3

3

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

1

3

3

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

Rencana Tanggap Darurat

1

Gempa bumi

Terinjak saat evakuasi, tertimpa bangunan roboh, terjatuh dari ketinggian, kebakaran

Luka, cidera, Kematian

2

Angin Putting Beliung

Tertimpa bangunan rubuh, tertimpa atap asbes terbang, terjatuh dari ketinggian

Luka, cidera, Kematian

4

3 12 H

3

Huru Hara

Terkena lemparan batu, perkelahian

Luka, cidera, Kematian

4

3 12 H

4

5

4

Rencana Tanggap Darurat

Terinjak saat evakuasi, tertimpa Ancaman/ Ledakan bangunan roboh, terjatuh dari Bom ketinggian, terkena benda tajam

Luka, cidera, Kematian

4

3 12 H

Terinjak saat evakuasi, terbakar, kehabisan oksigen, asap panas, jatuh dari ketinggian

Luka, cidera, Kematian

4

3 12 H

Kebakaran

REVISI TERKAIT KECELAKAAN

Rencana Tanggap Darurat ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Hand Gloves dan Training Hand Safety PPE : Pakai sarung tangan Rencana Tanggap Darurat

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

S

R

3

Permenaker no proteksi menggunakan pengaman menggunakan 1/MEN/1980 sangkar sebagai penanda proteksi ttg Keselamatan 12 H dan Kesehatan Kerja pada Konstruksi Bangunan

3

Permenaker no authorized operator 1/MEN/1980 ttg Keselamatan 12 H dan Kesehatan Kerja pada Konstruksi Bangunan

3

Permenaker no 1/MEN/1980 ttg Keselamatan 12 H dan Kesehatan Kerja pada Konstruksi Bangunan

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety Supervisor

2

2

4

L

Safety Supervisor

2

1

2

L

Safety & Supervisor

Instruksi Kerja tentang Pekerjaan Galian dan pasang

1

Galian bekas bore Terperosok dalam lubang pile

Luka, cidera, kematian

4

Perketat inspeksi pre mob, beri ID card untuk

2

3

Aktivitas borepiling Alat berat terperosok atau boom menggunakan alat crane patah berat

Aktivitas Terkena manuver alat berat pembuangan tanah (excavator dan dump truck)

Luka, cidera, kematian

Luka, cidera, kematian

4

4

ENG : Pasang Baricade isolir area ADM : General Work Permit sesuai Prosedur Pemasangan Rambu "Awas Manuver Alat Berat" dan Training dan Pemasangan Proteksi, Prestart Inspection, Pengaturan akses alat berat, Penempatan Rigger/ Signalman PPE : Pakai Helmet

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

Color

Before

Item

LEGAL REFERENCE

S

R

3

Permenaker no 1/MEN/1980 ttg Keselamatan 12 H dan Kesehatan Kerja pada Konstruksi Bangunan

3

Permenaker no 1/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

1

2

2

L

Safety & Supervisor

Pasang rambu " Awas kabel tegangan Tinggi "

4

5

6

Aktivitas pembuangan tanah Kabel listrik terkena excavator menggunakan excavator

Pemasangan bekesting / formwork

Material bekesting jatuh

Lifting dan rigging tabrakan antar TC menggunakan TC

Luka, cidera, kematian, operasi alat yg terkait listrik terhenti

Luka, Cidera

Luka, Cidera, meninggal

4

3

4

9

3 12 H

Permenaker no 1/MEN/1980 ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Menggunakan alat bantu untuk melepaskan formwork.

Menggunakan radio HT khusus untuk operator dan rigger untuk kelancaran komunikasi rigger-operator

2

2

4

L

Safety & Construction

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

L

S

RESIDUAL RISK

LEGAL REFERENCE

Control Measure

R

Color

Before

Item

BBS/HSE/General-01 -

9

Permenaker no safety glass karena tidak cukup aman 1/MEN/1980 ttg Keselamatan M dan Kesehatan Kerja pada Konstruksi Bangunan

Responsibility

L

S

R

Color

Operation/Task Location/Area

2

2

4

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

2

2

4

L

Safety & Construction

Gunakan safety goggle, tidak boleh menggunakan

7

Aktivitas ground anchor

Mata terkena percikan mortar

Luka, cedera

3

3

Memastikan sudut penempatan 1,65derajat, Revisi

8

Aktivitas pemasangan PC Façade

PC Standing terjatuh

Luka, Cidera, meninggal

4

3 12 H

Permenaker desain PC Standing, dan pastikan urutan pemasangan no 1/MEN/1980 sesuai dengan method statement ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Tambahkan perkuatan pada hollow bekisting dengan

Luka, Cidera, Kolom jebol dan concrete terjatuh kerusakan kebawah properti

9

Aktifitas pengecoran kolom

3

3

9

Permenaker plat besi no 1/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Pekerjaan 10 menggunakan chainb= block di perimeter gedung

Hazard Risk Identified

Chain block terjatuh saat setting PC Luka, cidera, Façade meninggal

L

S

R

Color

Before

Item

LEGAL REFERENCE

BBS/HSE/General-01 RESIDUAL RISK

Control Measure

S

R

2

2

4

L

2

1

2

L Rigger & Helper

3

1

3

L

3

1

3

Safety, L construction & foreman

Kaitkan kedua hook chain block sebelum chain block didekatkan ke PC Façade 4

3 12 H

Responsibility

L

Color

Operation/Task Location/Area

Safety & Supervisor

ADM : General Work Permit sesuai Prosedur

11 Aktifitas tower crane, mobile crane, crawler crane, dan unicrane

Tangan / anggota tubuh terjepit sling

Luka, cedera

3

3

9

Permenaker Pemasangan Rambu "Awas Terjepit " dan Training no 1/MEN/1980 Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan ttg M Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Pasang penutup dari multiplex, pasang railing & safety

12

Luka, cedera, kematian

4

3 12 H

Pekerja celaka akibat cacat bawaan Luka, cedera, sebelum bekerja kematian

4

3 12 H

Terjatuh / terperosok

Aktifitas di dekat shaft / opening 13 Aktifitas di proyek

Permenaker net serta rambu tanda bahaya pada setiap shaft / no 1/MEN/1980 opening ttg Keselamatan dan Kesehatan Kerja pada Konstruksi Bangunan

Pastikan pekerja dengan tubuh cacat tidak dipekerjakan di area dengan potensi tinggi kecelakaan

Safety

Berca Buana sakti

Risk Assessment

CSA & MEP WORKS PACKAGE PT BUNGASARI FLOUR MILLS INDONESIA MEDAN PROJECT General Project Activities Project Site

Risk Assessment No. Method Statement

Activities / Area

Hazard Risk Identified

14

15

Terjatuh dari ketinggian

S

R

Luka, cidera

3

3

9

Luka, cidera

3

3

9

Mata Terkena sisa besi rebar yang Luka, cidera di taruh diatas scaffolding

3

3

9

Pemasangan Slab form dan beam formwork Jatuh karena tertabrak material yang terbang

16

L

Color

Before

Item

M

17

Pembongkaran Bagian bekisting terlepas dari Formwork dan lantai atas dan jatuh menimpa Scaffolding struktur orang

18

Tangan/anggota tubuh terjepit material

Luka, cidera

3

3

Material terjatuh

Luka, cidera, kematian

4

3 12 H

Aktivitas tower crane, mobile crane, crawler crane

19

Luka, cidera

3

3

9

9

RESIDUAL RISK

LEGAL REFERENCE

Permenaker no 1/MEN/1980 ttg M Keselamatan dan Kesehatan Kerja pada M Konstruksi Bangunan

BBS/HSE/General-01 Control Measure

ENG : Pasang life line ADM : Work at Height Permit sesuai Prosedur , Pemasangan Rambu "Gunakan Safety Body Harness / Body Harness" dan Training Penggunaan APD, Bekerja di ketinggian, Pemasangan Scaffolding PPE : Pakai Helm + tali dagu dan Safety Body Harness Rapatkan atau paku semua material yang berpotensi terbang karena angin besar Penempatan material yang rapi

S

R

3

1

3

L

Safety & Supervisor

3

1

3

L

Safety & Supervisor

1

1

2

L

Safety & Supervisor

2

2

4

L

Safety & Supervisor

2

2

4

L

Safety & rigger

2

2

4

L

Safety & rigger

Penempatan safety net (engineering control),

M

M

ADM : General Work Permit sesuai Prosedur , Pemasangan Rambu "Awas Terjepit " dan Training Hand Safety , Penempatan Rigger/ Signalman PPE : Pakai Helmet, Sarung tangan Gunakan teknik sesuaiProsedur lifting rigging, tower crane, dan telescoping

Prepared by :

Signature:

Date:

Approved by :

Signature:

Date:

Note: R(Rating) = [(L) x (S)] L: Likelihood/peluang; S: Severity/keparahan

Responsibility

L

Color

Operation/Task Location/Area

Rating Categories: Green (Low) = 1-4; Amber (Medium) = 5-12; Red (High) = 15-25, see BBS/P32-02: Risk Assessment. For R > 15, make Specific Risk Assessment

Related Documents

Hiradc
March 2021 0

More Documents from "Suharto Ari"

Hiradc
March 2021 0
Bahagia Itu Dipraktekin.pdf
February 2021 0
Amina_2
February 2021 2