TANAP LOGO

Activity No.

INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION

Activity Description

Inspection/Test Requirements

Reference Document

SURVEY 1

Equipment Identification

Survey Equipment is calibrated

Manufacturers specification

2

Visual and Dimensional Check

Centrer locations at initial survey are located and staked

3

Anchoring Bolt positioning check

Verify survey markers are easily identified and placed securely

Supplier Drawings

Visual Inspection Procedure Dimensional Inspection procedure & drawing

4

Excavation

verify all Earth work baselines are set outside of the excavated areas to

WPS Visual Inspection Procedure NDE Procedures Applicable Codes

5

Bolt tightening

avoid destruction

As per drawing spec.

6

galvanized coating check

  Verify that galvanized coating applied properly.

Company Specifications

Material Identification

• Verify material certificates exist and conform to project list

Supplier Drawings/ Packing List

Visual and Dimensional Check

•Verify that dimensions are correct. •Verify that material is free from defects and inacceptable condition

Visual Inspection Procedure Dimensional Inspection procedure & drawing

Welding ( if required )

•Verify proper WPS used •Verify welder cards •Verify proper fitup realized. •Visual check of weld seams. •NDT examination performed. (If required)

WPS Visual Inspection Procedure NDE Procedures Applicable Codes

10

Bolt tightening

* Verify that all the bolts are secure and tightened according to project drawings and specifications.

As per drawing spec.

11

Painting / coating check (if required)

  Verify that final coating applied properly.

Company Specifications

HANDRAILS AND LADDERS 7 8

9

DINAMIK / SYA LOGO

DINAMIK

TANAP LOGO

Activity No.

INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION

Activity Description

Inspection/Test Requirements

Reference Document

WALKWAYS 12 13

Material Identification

• Verify material certificates exist and conform to project list

Supplier Drawings/ Packing List

Visual and Dimensional Check

•Verify that dimensions are correct. •Verify that material is free from defects and inacceptable condition

Visual Inspection Procedure Dimensional Inspection procedure & drawing WPS Visual Inspection Procedure NDE Procedures Applicable Codes

14

Welding ( if required )

•Verify proper WPS used •Verify welder cards •Verify proper fitup realized. •Visual check of weld seams. •NDT examination performed. (If required)

15

Bolt tightening

* Verify that all the bolts are secure and tightened according to project drawings and specifications.

As per drawing spec.

16

Painting / coating check (if required)

  Verify that final coating applied properly.

Company Specifications

RADIATORS (TUBE BUNDLES AND FAN DRIVES) 17

Material Identification

• Verify material certificates exist and conform to project list • Verify spool markings as per erection marking plans and Tag verification

Supplier Drawings/ Packing List

18

Visual and Dimensional Check

•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition

Visual Inspection Procedure Dimension inspection procedure & isometric

19

Positioning Check

* Verify that the position is correct after installation.

Supplier Drawings

20

Bolt tightening

* Verify that all the bolts are secure and tightened according to project drawings and specifications.

As per drawing spec.

21

Document review

• Review erection documentation

Quality Dossier

22

Painting / coating check (if required)

  Verify that final coating applied properly.

Company Specifications

DINAMIK / SYA LOGO

DINAMIK

TANAP LOGO

Activity No.

Activity Description

INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION

Inspection/Test Requirements

Reference Document

DINAMIK / SYA LOGO

DINAMIK

INLET PIPING 23

Material Identification

• Verify material certificates exist and conform to project list • Verify markings as per erection marking plans and Tag verification

24

Visual and Dimensional Check

•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition

Visual Inspection Procedure Dimensional Inspection procedure & drawing

25

Orientation contol

• Verify that Spools are placed in correct orientation on the equipment.

Approved fabrication drawings Approved Plot plan.

H

26

Bolt tightening

* Verify that all the bolts are secure and tightened according to project drawings and specifications.

Supplier Drawings and documents

H

27

Document review

• Review erection documentation

Quality Dossier

H

28

Painting / coating check (if required)

  Verify that final coating applied properly.

Company Specifications

H

• Verify material certificates exist and conform to project list • Verify markings as per erection marking plans and Tag verification

Supplier Drawings/ Packing List

H

Visual Inspection Procedure Dimensional Inspection procedure & drawing

Supplier Drawings/ Packing List

H

H

OUTLET PIPING 29

Material Identification

30

Visual and Dimensional Check

•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition

31

Orientation contol

• Verify that Spools are placed in correct orientation on the equipment.

Approved fabrication drawings Approved Plot plan.

H

32

Bolt tightening

* Verify that all the bolts are secure and tightened according to project drawings and specifications.

Supplier Drawings and documents

H

33

Document review

• Review erection documentation

Quality Dossier

H

34

Painting / coating check (if required)

  Verify that final coating applied properly.

Company Specifications

H

H

TANAP LOGO

Activity No.

Activity Description

INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION

Inspection/Test Requirements

Reference Document

DINAMIK / SYA LOGO

DINAMIK

VIBRATION SWITCHES 35

Material Identification

36

Visual and Dimensional Check

37

Orientation contol before erection

• Verify material certificates exist and conform to project list • Verify markings as per erection marking plans and Tag verification * Compliance to type

Supplier Drawings/ Packing List

•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition

Visual Inspection Procedure Dimensional Inspection Procedure & Drawings

• Verify that all the attachments are placed in correct orientation on the equipment

Approved fabrication drawings Approved Plot plan.

JUNCTION BOXES 38

Material Identification

39

Visual and Dimensional Check

40

Orientation contol before erection

• Verify material certificates exist and conform to project list • Verify markings as per erection marking plans and Tag verification * Compliance to type

Supplier Drawings/ Packing List

•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition

Visual Inspection Procedure Dimensional Inspection Procedure & Drawings

• Verify that all the attachments are placed in correct orientation on the equipment.

Approved fabrication drawings Approved Plot plan.

INSPECTION POINT H

Is a HOLD POINT, which no work may proceed beyond this operation until acceptance by the inspector

W

Is a WITNESS POINT, which no work may proceed beyond this operation until the Inspector has accepted it

R

Is a REVIEW POINT, which cover the review of documents & does not require acceptance of the Inspector before proceeding with next operation, but must be seen prior to stamping of the

AI

Authorized Inspector

WHC

Ware House Chief

PREPARED BY NAME: DATE: SIGN:

SYA

Page: Date : Rev. No: Doc.No. : Inspection SYA

EPCM/TANAP

Page: Date : Rev. No: Doc.No. : Inspection SYA

EPCM/TANAP

Page: Date : Rev. No: Doc.No. : Inspection SYA

EPCM/TANAP

H

R

H

W/R

H

W/R

H

W/R

R

H

H

W/R

H

W/R

H

W/R

H

W/R

H

W/R

R

H

H

W/R

Page: Date : Rev. No: Doc.No. : Inspection SYA

EPCM/TANAP

or

pted it

ector before proceeding with next operation, but must be seen prior to stamping of the item

EPCM/TANAP

Related Documents