TANAP LOGO
Activity No.
INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION
Activity Description
Inspection/Test Requirements
Reference Document
SURVEY 1
Equipment Identification
Survey Equipment is calibrated
Manufacturers specification
2
Visual and Dimensional Check
Centrer locations at initial survey are located and staked
3
Anchoring Bolt positioning check
Verify survey markers are easily identified and placed securely
Supplier Drawings
Visual Inspection Procedure Dimensional Inspection procedure & drawing
4
Excavation
verify all Earth work baselines are set outside of the excavated areas to
WPS Visual Inspection Procedure NDE Procedures Applicable Codes
5
Bolt tightening
avoid destruction
As per drawing spec.
6
galvanized coating check
Verify that galvanized coating applied properly.
Company Specifications
Material Identification
• Verify material certificates exist and conform to project list
Supplier Drawings/ Packing List
Visual and Dimensional Check
•Verify that dimensions are correct. •Verify that material is free from defects and inacceptable condition
Visual Inspection Procedure Dimensional Inspection procedure & drawing
Welding ( if required )
•Verify proper WPS used •Verify welder cards •Verify proper fitup realized. •Visual check of weld seams. •NDT examination performed. (If required)
WPS Visual Inspection Procedure NDE Procedures Applicable Codes
10
Bolt tightening
* Verify that all the bolts are secure and tightened according to project drawings and specifications.
As per drawing spec.
11
Painting / coating check (if required)
Verify that final coating applied properly.
Company Specifications
HANDRAILS AND LADDERS 7 8
9
DINAMIK / SYA LOGO
DINAMIK
TANAP LOGO
Activity No.
INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION
Activity Description
Inspection/Test Requirements
Reference Document
WALKWAYS 12 13
Material Identification
• Verify material certificates exist and conform to project list
Supplier Drawings/ Packing List
Visual and Dimensional Check
•Verify that dimensions are correct. •Verify that material is free from defects and inacceptable condition
Visual Inspection Procedure Dimensional Inspection procedure & drawing WPS Visual Inspection Procedure NDE Procedures Applicable Codes
14
Welding ( if required )
•Verify proper WPS used •Verify welder cards •Verify proper fitup realized. •Visual check of weld seams. •NDT examination performed. (If required)
15
Bolt tightening
* Verify that all the bolts are secure and tightened according to project drawings and specifications.
As per drawing spec.
16
Painting / coating check (if required)
Verify that final coating applied properly.
Company Specifications
RADIATORS (TUBE BUNDLES AND FAN DRIVES) 17
Material Identification
• Verify material certificates exist and conform to project list • Verify spool markings as per erection marking plans and Tag verification
Supplier Drawings/ Packing List
18
Visual and Dimensional Check
•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition
Visual Inspection Procedure Dimension inspection procedure & isometric
19
Positioning Check
* Verify that the position is correct after installation.
Supplier Drawings
20
Bolt tightening
* Verify that all the bolts are secure and tightened according to project drawings and specifications.
As per drawing spec.
21
Document review
• Review erection documentation
Quality Dossier
22
Painting / coating check (if required)
Verify that final coating applied properly.
Company Specifications
DINAMIK / SYA LOGO
DINAMIK
TANAP LOGO
Activity No.
Activity Description
INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION
Inspection/Test Requirements
Reference Document
DINAMIK / SYA LOGO
DINAMIK
INLET PIPING 23
Material Identification
• Verify material certificates exist and conform to project list • Verify markings as per erection marking plans and Tag verification
24
Visual and Dimensional Check
•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition
Visual Inspection Procedure Dimensional Inspection procedure & drawing
25
Orientation contol
• Verify that Spools are placed in correct orientation on the equipment.
Approved fabrication drawings Approved Plot plan.
H
26
Bolt tightening
* Verify that all the bolts are secure and tightened according to project drawings and specifications.
Supplier Drawings and documents
H
27
Document review
• Review erection documentation
Quality Dossier
H
28
Painting / coating check (if required)
Verify that final coating applied properly.
Company Specifications
H
• Verify material certificates exist and conform to project list • Verify markings as per erection marking plans and Tag verification
Supplier Drawings/ Packing List
H
Visual Inspection Procedure Dimensional Inspection procedure & drawing
Supplier Drawings/ Packing List
H
H
OUTLET PIPING 29
Material Identification
30
Visual and Dimensional Check
•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition
31
Orientation contol
• Verify that Spools are placed in correct orientation on the equipment.
Approved fabrication drawings Approved Plot plan.
H
32
Bolt tightening
* Verify that all the bolts are secure and tightened according to project drawings and specifications.
Supplier Drawings and documents
H
33
Document review
• Review erection documentation
Quality Dossier
H
34
Painting / coating check (if required)
Verify that final coating applied properly.
Company Specifications
H
H
TANAP LOGO
Activity No.
Activity Description
INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION
Inspection/Test Requirements
Reference Document
DINAMIK / SYA LOGO
DINAMIK
VIBRATION SWITCHES 35
Material Identification
36
Visual and Dimensional Check
37
Orientation contol before erection
• Verify material certificates exist and conform to project list • Verify markings as per erection marking plans and Tag verification * Compliance to type
Supplier Drawings/ Packing List
•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition
Visual Inspection Procedure Dimensional Inspection Procedure & Drawings
• Verify that all the attachments are placed in correct orientation on the equipment
Approved fabrication drawings Approved Plot plan.
JUNCTION BOXES 38
Material Identification
39
Visual and Dimensional Check
40
Orientation contol before erection
• Verify material certificates exist and conform to project list • Verify markings as per erection marking plans and Tag verification * Compliance to type
Supplier Drawings/ Packing List
•Verify that dimensions are correct. •Verify that material is free from defects and in acceptable condition
Visual Inspection Procedure Dimensional Inspection Procedure & Drawings
• Verify that all the attachments are placed in correct orientation on the equipment.
Approved fabrication drawings Approved Plot plan.
INSPECTION POINT H
Is a HOLD POINT, which no work may proceed beyond this operation until acceptance by the inspector
W
Is a WITNESS POINT, which no work may proceed beyond this operation until the Inspector has accepted it
R
Is a REVIEW POINT, which cover the review of documents & does not require acceptance of the Inspector before proceeding with next operation, but must be seen prior to stamping of the
AI
Authorized Inspector
WHC
Ware House Chief
PREPARED BY NAME: DATE: SIGN:
SYA
Page: Date : Rev. No: Doc.No. : Inspection SYA
EPCM/TANAP
Page: Date : Rev. No: Doc.No. : Inspection SYA
EPCM/TANAP
Page: Date : Rev. No: Doc.No. : Inspection SYA
EPCM/TANAP
H
R
H
W/R
H
W/R
H
W/R
R
H
H
W/R
H
W/R
H
W/R
H
W/R
H
W/R
R
H
H
W/R
Page: Date : Rev. No: Doc.No. : Inspection SYA
EPCM/TANAP
or
pted it
ector before proceeding with next operation, but must be seen prior to stamping of the item
EPCM/TANAP