SULTANATE OF OMAN
EMPLOYER
PRELIMINARY DESIGN CONSULTANT
RELEASED BY PROJECT DIRECTOR ROBERTO LIUZZA DATE
30/10/2014 PROJECT NAME
CONSULTANCY SERVICES FOR PRELIMINARY DESIGN FOR OMAN NATIONAL RAILWAY PROJECT DRAWING TITLE
CONCEPT DESIGN – REVISED NETWORK GENERAL TECHNICAL REPORT
DOCUMENT CODE PROJECT CODE
COMPONENT DESIGN SUBTASK PHASE
OM00
REV.
A
A5
R
PROD. CENTER
99
DOC. TYPE
RG
MD 00 0 Z
001
A
DESIGN TEAM
KEY EXPERT
PROJECT ENGINEER
GOVERNANCE AREA MANAGER
Drawn
Verified
Approved
Authorized
L.Giacon
F. Arduini
G. Venditti M. Di Napoli
D. Agostini
DESCRIPTION
Final submission
DOC. REV. NUMBER
WBS & ACTIVITY
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 2/32
TABLE OF CONTENTS 1.
LIST OF ABBREVIATIONS ................................................................................................... 3
2.
GENERAL ASPECTS ............................................................................................................ 6
2.1
THE OMAN NATIONAL RAILWAY PROJECT ........................................................................................ 6
3.
PRELIMINARY OPERATION PLAN ...................................................................................... 9
4.
ALIGNMENT ........................................................................................................................ 10
5.
GEOLOGICAL AND GEOTECHNICAL STUDY .................................................................. 28
6.
HYDROLOGICAL AND HYDRAULICAL STUDY ................................................................ 29
7.
ENVIRONMENTAL ASPECTS ............................................................................................ 30
8.
STATIONS ........................................................................................................................... 31
9.
FREIGHT TERMINALS, YARDS AND DEPOTS ................................................................. 32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
1.
LIST OF ABBREVIATIONS ABBREVIATION
MEANING
ALARP
As Low As Reasonably Practicable
CARs
Corrective Action Requests
CCB
Change Control Board
CCL
Change Control Log
CEMP
Environmental Management Plans for Construction
CET
controlled emission toilet
CFMP
Configuration Management Plan
CFMS
Configuration Management System
CFR
Change Request Form
CPM
Critical Path Method
CQP
Construction Quality Plan
CSD
Combined Services Drawings
DAS
Drawing Amendment Sheets
DCP
Design Control Point
DMUs
Diesel Multiple Units
DOORS
Dynamic Object-Orientated Requirements System
DQP
Design Quality Plan
DSR
Document Submittals Register
E&B
Earthling & Bonding
EB
Electrical Building
EIA
Environmental Impact Assessment
EIP
External Interfacing Parties
EMC
Electromagnetic Magnetic Compatibility
EMIS
Environmental Mitigation Implementation Schedule
Ems
Environmental Management System
EN
European Standard (Europäische Norm)
ERTMS
European Rail Traffic Management System
FCR
Field Change Requests
FRACAS
Failure Reporting Analysis and Corrective Action System
GCC
Gulf Cooperation Council
H&S
Health and Safety
REV A
PAG 3/32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
HVAC
Heating, Ventilation and Air Conditioning
IAP
Impact Assessment Process
ICD
Interface Control Document
IMS
Interface Management System
IRM
Interface Responsibility Matrix
ITP
Inspection and Test Plans
LMS
Lighting Management System
LS
Lighting System
LV
Low voltage
LWR
Long Welded Rail
MEP
Mechanical, Electrical And Plumbing
MMIS
Maintenance Management Information System
MV
Medium Voltage
NCR
Non-conformance Report
NOCs
No Objection Certificates
OCC
Operation Control Centre
ONR
Oman National Railway
pDQP
preliminary Design Quality Plan
PPE
Personal Protective Equipment
PQP
Project Quality Plan
PV
photovoltaic systems
QA
Quality Assurance
QC
Quality Control
QM
Quality Manual
QMS
Quality Management System
RAM
Reliability, Availability and Maintainability
RAMS
Reliability, Availability, Maintainability and Safety
RCC
Record Management System
RCIL
Reliability Critical Items List
RcMS
Records Management System
RcMS
Records Management System
ReMP
Requirements Management Plan
ReMS
Requirements Management System
RMP
Record Management Plan
REV A
PAG 4/32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
ROW
right–of-way
S&C
Swished & Crossing
SAT
Site Acceptance Test
SCADA
Supervisory, Control and Data Acquisition
SCIL
Safety Critical Items List
SIL
Safety Integrity Level
SIT
System Integration Testing
STRIP
Station Related Installation Programme
T&C
Testing and Commissioning
TB
Technical Building
TRIP
Track Related Installation Programme
REV A
PAG 5/32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
2.
GENERAL ASPECTS
2.1
THE OMAN NATIONAL RAILWAY PROJECT
REV A
PAG 6/32
2.1.1. The National Railway Project in the Sultanate of Oman will consist of about 2135 km of railway line, linking - as part of GCC Railway Network – the Oman border with UAE (at Al Ain and Khatmat Milahah) to Muscat, to the central and southern parts of the country at Port of Ad Duqm and Salalah and to the Yemen border. The Oman National Railway is intended to be a double track mixed freight and passenger non-electrified railway line. The planned Oman National Railway (ONR) Network, that will link the most populated areas, the ports and the increasing productive activities of the Sultanate, will be part of the GCC Railway. 2.1.2. The Oman National Rail Project is divided into 9 Segments for a total length of 2135 km, as presented in the following table. Segment
2 3
4 5 6 7 8 9
Sector a b c a b a b c a b c a b a a a a
Sector Description
Approx. Length km
Sohar to UAE Border at Hafeet / Al Ain Al Buraimi Spur Spur to Sohar Railway Yard Hafeet - Ibri Ibri –Al Dahra economical zone Al Dhara economical zone - Al Gabah Al Gabah-Haima Al Gabah - Duqm Haima- Amal Amal - Thumrayt Thumrayt - Salalah Port Sohar - Muscat (Al Misfah) Link for Muscat Central Station Al Misfah - Sinaw Sinaw - Ibra Thumrayt - Mazyounah Sohar Port to UAE Border at Khatmat Milahah
135 34 38 114 126 116 197 175 166 220 93 188 18 160 91 194 70 Total
Table 1. Segments in Omani Railway Network
In the figure below the configuration of the Oman Railway Network Master Plan is shown.
2135
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 7/32
During the first phases of the preliminary design, a Multicriteria analysis has been done to define the best network configuration and Development Plan priorities of the railway system for the Sultanate, reviewing the outcome of all previous Feasibility Studies. The results of this exercise is the current network configuration, approved by the Omani Supreme Council of Planning as shown in the Figure. Phase 1 and Phase 2 include the Segments that are included in the Oman Rail Network Preliminary Design tasks . Phase 3 includes 3 more Segments that would complete the network configuration, planned to be implemented in Phase 3 (Long term developments).
(COMPLETARE A CURA DEI P.E.)
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
Figure 1 – Alignment – Sectors
REV A
PAG 8/32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
3.
REV A
PAG 9/32
PRELIMINARY OPERATION PLAN
(FRANCESCHINI / SICLARI) Inserire una breve descrizione degli aspetti principali dell’Operation Plan e rinviare per maggiori dettagli al documento specifico di Operation Plan.
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
4.
ALIGNMENT
The revised concept design alignment of ONR Project is shown in Map 1. Map 1 – Revised concept design of ONR Project
REV A
PAG 10/32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 11/32
The alignment revision involved Segment 2 B, 3 A, 3 B , 3 C and 4 A. These new Segments run mainly through flat areas with an expected maximum vertical gradient equal to 1%. The key alignment parameters of each Segment are mentioned in the next paragraphs. Such new Segments are sketched out in Table 2. Table 2 – Segments 2B,3A,3B,3C and 4A -Sectors division Length
Segment
Sector
Sector Description
2
B
Ibri – Adam
125.5
A
Adam – Al Ghabah
121.5
B
Al Ghabah – Haima
193
C
Haim – Al Duqm
178.5
A
Haima – Amal
170.5
3
4
Total Length
(Km)
789
These Segments were designed to operate as a mixed freight and passenger double track railway line, having a maximum permissible axle load of 32.4 tons. The alignment was designed with a design speed of 220 km/h for passenger trains. For heavy freight trains the design speed is 80 km/h, for light freight trains the design speed is 80 km/h. The maximum design speed for turnouts in the junctions is 120 km/h. The planned railway corridor of these segments, along the stretches where it is physically practicable, can permit future speed of 350 km/h for passenger trains. In dual track sections, the minimum distance between the centrelines of the tracks is 4.5 m.
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
4.1
REV A
PAG 12/32
SEGMENT 2 – SECTOR B
Segment 2 B is the southward continuation of segment 2 A. It departs from the city of Ibri (Al Dhahirah Governorate) ending its route near the city of Adam (Ad Dakhiliyah Governorate) and it has a total length of 125+500 km. Segment 2 B shall be connected with Ibri Logistic Area and Al Dahra Economical Zone. In Figure 2 it is illustrated the Railway alignment of Segment 2 B. Figure 2 - Segment 2B: from Ibri City to Adam
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 13/32
The main alignment features of Segments 2 B are sketched out as follows :
Km 0+000 – Starting point from Ibri Area
Km 3+000 – Passing loop – Bulk Terminal – Container Terminal – Maintenance Satellite Base
Km 6+000 – Railway Spur to Ibri Logistic Area
Km 8+500 – Ibri Station
Km 9+484 – Intersection with main road
Km 66+000 – Passing loop – Maintenance Base – Container Terminal
Km 86+715 – Intersection with Rd. 29
Km 91+000 – Fahud Station
Km 105+655 – Intersection with Rd. 29
Km 121+650 – Passing loop – Maintenance Satellite Base
Km 125+500 – End of Segment 2 B in Adam area
Ibri Station location was identified after having taken into account any instruction given by the main Stakeholders involved, namely:
Ministry of Defense (MOD)
Royal Court Affair (RCA)
Ibri Municipality
Ibri Ministry of Housing
Moreover Ibri Station location, as designed in the revised concept design, lies close to the Ibri logistic Center and near to One Million Palms Project. (Figure 3). The crossed land is definitely flat and no major constraints have to be faced. Minor roads, gas pipelines and small settlements along the roads have to be taken into consideration during the Preliminary Design Phase of Segment 2 B. A viaduct over Wadi Ibri, at around km 10+000 it is likely to be designed.
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 14/32
Figure 3- Ibri Area
The key parameters of the Segment 2 B railway alignment are reported in Table 3. Table 3- Key Parameters for Segment 2B Main Line
Total Length (km)
Max. Gradient (%)
Max. Cant (mm)
125+500
0.686
40
Min. Radius (m)
8000
Design Speed (km/h)
220
No. of Stations
2
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
4.2
REV A
PAG 15/32
SEGMENT 3 – SECTOR A
Segment 3 A is the southward continuation of segment 2 B. It connects Adam area with Al Ghabah area. Segment 3 A lies entirely within Ad Dakhiliyah Governorate. At the end of Segment 3 A it is located the station of Quarn Alalam. The railway line covers a total distance of 121+500 km. The designed alignment of Segment 3 A is shown in Figure 4. Figure 4- Segment 3A: from Adam to Al Ghabah
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 16/32
The main alignment features of Segments 3 A are sketched out as follows :
Km 0+000 – Starting point from Adam area
Km 56+000 – Passing loop - Maintenance base
Km 98+512 – Intersection with under study link road of Rd. 31
Km 114+000 – Passing loop – Bulk terminal – Maintenance Satellite base
Km 116+875 - Intersection with under study link road of Rd. 31
Km 117+500 – Quarn Alalam Station
Km 121+500 – End of Segment 3 A near Al Ghabah area
The crossed land is definitely flat and no major constraints have to be faced. During the Preliminary Design Phase of Segment 3 A, the under study upgrading of Rd. 31 shall be considered. Small wadis, minor roads and small settlements along the roads have to be taken into consideration during the Preliminary Design Phase of Segment 3 A. Several crossing with gas pipelines shall be solved along Segment 3 A. No major artworks have been envisaged along Segment 3 A. The key parameters of the Segment 3 A railway alignment are reported in Table 4
Table 4- Key Parameters for Segment 3A Main Line Total Length (km)
Max. Gradient (%)
Max. Cant (mm)
121+500
0.748
40
Min. Radius (m) 8000
Design Speed (km/h) 220
No. of Stations 1
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
4.3
REV A
PAG 17/32
SEGMENT 3 – SECTOR B
Segment 3 B is the southward continuation of Segment 3 A. It runs always parallel to Road 31 and it passes through very flat areas arriving at Haima City after having covered a total distance of 193+000 km. Segment 3 B crosses both Ad Dakhiliyah Governorate (from km 0+000 to km 5+000) and Al Wusta Governorate (from km 5+000 to km 193+000). A railway station shall be located in Haima. The designed alignment of Sector 3 B is illustrated in Figure 5. Figure 5- Segment 3B: from Al Ghabah to Haima
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 18/32
The main alignment features of Segments 3 B are sketched out as follows :
Km 0+000 – Starting point from Al Ghabah area
Km 14+640 – Intersection with under study link road of Rd. 31
Km 49+044 – Intersection with under study link road of Rd. 31
Km 52+000 – Passing loop – Maintenance base
Km 110+000 – Intersection with under study link road of Rd. 31
Km 112+000 – Passing loop – Maintenance base
Km 126+343 – Intersection with under study link road of Rd. 31
Km 157+920 – Starting point of Segment 3 C
Km 161+757 – Startint point of Junction 3 B- 3 C
Km 179+100 – Haima Station
Km 179+927 – Intersection with paved road in Haima area
Km 186+500 - Passing loop – Maintenance base
Km 193+000 – End of Segment 3 B in Haima area
The crossed land is definitely flat and no major constraints have to be faced. In some stretches of Segment 3 B the presence of sand dunes along the route might cause problems for the railway and it shall be studied in depth during the Preliminary Design (Figure 6). During the Preliminary Design Phase of Segment 3 B, the under study upgrading of Rd. 31 shall be considered. Minor roads, gas pipelines and small settlements along the roads have to be taken into consideration during the Preliminary Design Phase of Segment 3 B. Several crossing with gas pipelines shall be solved along Segment 3 B. No major artworks have been envisaged along Segment 3 B.
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 19/32
Figure 6- Sand Dunes along Segment 3 B
The key parameters of the Segment 3 B railway alignment are reported in Table 5
Table 5- Key Parameters for Segment 3B Main Line
Total Length (m)
Max. Gradient (%)
Max. Cant (mm)
193+000
0.328
40
Min. Radius (m)
8000
Design Speed (km/h)
220
No. of Stations
1
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
4.4
REV A
PAG 20/32
SEGMENT 3 – SECTOR C
Segment 3 C consists of a railway spur that connects the main railway line to Al Duqm. It departs from Segment 3 B at km 157+920. Segment 3 C runs almost completely parallel to Rd. 37, to the south of the Oryx Sanctuary protected area. The total length of Segment 3 C is 178+500 km. Figure 7 describes the alignment of Segment 3 C. Figure 7- Segment 3C: from Haima to Al Duqm
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 21/32
The main alignment features of Segments 3 C are sketched out as follows :
Km 0+000 – Starting point from km 157+920 of Segment 3 B
Km 2+950 – Intersection with Rd. 31
Km 14+000 – Passing loop – Maintenance base
Km 73+000 – Passing loop – Maintenance Satellite Base
Km 84+660 – Intersection with Rd. 37
Km 125+000 – Passing loop
Km 147+240 – Intersection with Rd. 37
Km 165+800 – Al Duqm Station
Km 173+000 – Railway Spur to Al Duqm Port Gate
Km 175+000 – Al Duqm Railway Yard (Marshalling Yard and Maintenance Depot)
Km 178+500 – End Segment 3 C
The crossed land is definitely flat and no major constraints have to be faced. Small wadis, minor roads, gas pipelines and small settlements along the roads have to be taken into consideration during the Preliminary Design Phase of Segment 3 C. This final stretch of Segment 3 C passes through a hilly land where cuts are required. No major artworks have been envisaged along Segment 3 C. Both Al Duqm station and Al Duqm railway yard were located in accordance with the last updated version of Al DuqM master plan. The Railway Freight Yard shall be connected with the main gate of the Port of Al Duqm by means of a railway spur. During the very first phase of the revision of Concept Design a north route was identified to connect Al Duqm with the main line (Map 2)
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 22/32
Map 2 – Segment 3 C North and South solutions
The site survey undertaken along the north route had emphasized some challenging features for the Railway design especially in the final portion of this route, namely:
The vicinity with the Oryx Sanctuary fence (Photo 1)
The difficulty for the accessibility of certain areas due to the lack of any kind of road (Photo 2)
The general complexity of the land compared to the flatness of the south route.
But the most significant reason that led to change from North option to South solution has been the no approval given by both Ministry of environment, Diwan of Royal Court.
Culture and Heritage and Office for conservation of the
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
Photo 1 –- 3 C north route landscape
Photo 2 – Oryx Sanctuary fence
REV A
PAG 23/32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 24/32
The key parameters of the Segment 3 C railway alignment are reported in Table 7
Table 6- Key Parameters for Segment 3C Main Line
Total Length (m)
Max. Gradient (%)
Max. Cant (mm)
178+500
0.637
50
Min. Radius (m)
6000
Design Speed (km/h)
220*
No. of Stations
1
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
4.5
REV A
PAG 25/32
SEGMENT 4 – SECTOR A
Segment 4 A is the southward continuation of Segment 3 B. It starts from Haima and, after having crossed Rd. 31, it runs parallel to an unpaved road which connects Rd. 31 with Rd. 29. Segment 4 A joins Segment 4 B in the vicinity of Amal. The total length of Segment 4 A is 170+500 km. Figure 8 describes the alignment of Segment 4A. Figure 8- Segment 4A: from Haima to Amal
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 26/32
The main alignment features of Segments 4 A are sketched out as follows :
Km 0+000 – Starting point near Haima
Km 6+993 - Intersection with under study link road of Rd. 31
Km 11+180 – Intersection with Rd. 31
Km 55+000 – Passing loop
Km 119+000 – Passing loop
Km 141+394 – Intersection with unpaved road
Km 150+000 – Potential conflict with water treatment basin (Figure 9)
Km 150+770 – Intersection with unpaved road
Km 165+000 – Passing Loop
Km 170+530 – End Segment 4 A
The crossed land is definitely flat and no major constraints have to be faced. The final stretch of Segment 4 A passes through an oil and gas area where a lots of conflicts with power lines and gas pipelines shall be solved During the Preliminary Design Phase of Segment 4 A, the under study upgrading of Rd. 31 shall be considered. No major artworks have been envisaged along Segment 4 A.
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
REV A
PAG 27/32
Figure 9: Bauer-Nimr Water Treatment (PFKA), NIMR-Oilfield, Oman
The key parameters of the Segment 4 A main line railway alignment are reported in Table 8
Table 7- Key Parameters for Segment 4A Main Line
Total Length (m)
Max. Gradient (%)
Max. Cant (mm)
170+500
0.107
40
Min. Radius (m)
8000
Design Speed (km/h)
220
No. of Stations
0
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
5.
REV A
PAG 28/32
GEOLOGICAL AND GEOTECHNICAL STUDY
(MARCHESE /PAOLUCCI) Breve descrizione dei principali elementi geologici ad oggi acquisiti (carte, sopralluoghi) lungo nuova network.
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
6.
REV A
PAG 29/32
HYDROLOGICAL AND HYDRAULICAL STUDY
(CABAS / VENTURA) Breve descrizione dei principali elementi di carattere idrologico e idraulico che caratterizzano le zone interessate dalla nuova network.
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
7.
ENVIRONMENTAL ASPECTS
(CORVAJA / CARANTI) Breve descrizione dei vincoli ambientali riscontrati lungo la nuova network.
REV A
PAG 30/32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
8.
STATIONS
(FAZIO) Breve descrizione delle stazioni presenti nella nuova network.
REV A
PAG 31/32
PRELIMINARY DESIGN FOR
OMAN NATIONAL RAILWAY PROJECT SEGMENT 1 – OMAN / UAE BORDER AT AL BURAIMI - SOHAR GENERAL TECHNICAL REPORT DOCUMENT CODE OM00.A5.R.99.RG.MD.00.0.Z.001
9.
FREIGHT TERMINALS, YARDS AND DEPOTS
(BARELLI / PECORARIO) Breve descrizione degli impianti ferroviari presenti nella nuova network.
REV A
PAG 32/32